Step
Activity
1
Timber planks were carefully measured and sharpened at
one end using an electric hand saw so they can be used as `
stakes and be easily driven into the ground.
2
The site was accurately measured to determine the
building layout and mark the boundary positions.
3
Stakes were hammered securely into the ground to
indicate the corners of the building footprint.
4
5
Timber planks (batten boards) were cut to the required
lengths.
The planks were then drilled onto the stakes to form the
corner profile boards.
6
The corner profile boards were checked using a builder’s
square to ensure that all corners were at 90° angles.
7
A spirit level and the 3:4:5 triangle method were used to
confirm that the corner profiles were perfectly level and
square and created a perfect right angle corner.
8
String lines, representing the building lines, were
stretched tightly between the corner profile boards to
establish the main orientation of the building.
9
Additional measurements along the sides were taken to
ensure the layout matched the required 30 ft × 30 ft
dimensions.
10
Trenching lines were marked parallel to the building lines
to indicate the width and position of the foundation
trenches.
11
Wall width lines were marked within the trenching lines
to show the exact position and thickness of the walls.
12
Positions of internal and cross walls were measured using
offsets from the external walls to ensure proper alignment.
Pictures
13
All measurements, angles, trenching lines, and wall width
lines were carefully double-checked, and final
adjustments were made to ensure the layout was accurate,
square, and properly aligned before excavation, casting,
and laying of blocks.