GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Use and Interpretation of this document This document is classified as General unless labelled otherwise. It contains BP proprietary information. BP’s Code of Conduct requires you to protect that information. Refer to the Protecting our Information Policy for more details. Outside BP, you can only distribute and use this document in accordance with the terms of any agreement under which it was supplied or received. BP accepts no liability or responsibility for the use of this document outside BP, unless an agreement with BP says otherwise. This document applies only if it is consistent with applicable legal and regulatory requirements. If you are within BP and you identify an apparent conflict with those requirements, you should consult BP Legal. This document has been approved for BP’s purposes only and not to describe or establish an industry standard or practice. Any recommendations or guidance are to help users to consider and evaluate potential options. Another approach may be appropriate. The authoritative, English version of this document is held online at https://intranet.bp.com/en_gb/group/bprequirements.html. It takes precedence over any prior version and any non-English version. Copyright © 2020. BP International Ltd. All rights reserved. GPO Revision No. B03 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Table of Contents Page Foreword ............................................................................................................................................7 Introduction ........................................................................................................................................8 Chapter I Scope and definitions .........................................................................................................9 300 General statements...................................................................................................................9 300.1 Scope.............................................................................................................................9 300.2 Definitions ....................................................................................................................10 300.4 Status of appendices ...................................................................................................11 Chapter V Fabrication, assembly, and erection ...............................................................................12 327 General ...................................................................................................................................12 327.1 Control of welding and fabrication ...............................................................................12 327.2 Health, safety, and environment (HSE) for welding operations ...................................14 327.3 Material control and storage ........................................................................................14 327.4 Pipework marking ........................................................................................................15 327.5 Fabrication facilities .....................................................................................................16 327.6 Welding equipment ......................................................................................................17 328 Welding and brazing ...............................................................................................................17 328.2 Welding and brazing qualification ................................................................................17 328.3 Welding materials ........................................................................................................22 328.4 Preparation for welding................................................................................................23 328.5 Welding requirements..................................................................................................26 328.6 Weld repair ..................................................................................................................31 330 Preheating...............................................................................................................................32 330.1 General ........................................................................................................................32 330.2 Specific requirements ..................................................................................................33 331 Heat treatment ........................................................................................................................33 331.1 General ........................................................................................................................34 331.2 Specific requirements ..................................................................................................35 332 Bending and forming...............................................................................................................36 332.2 Bending........................................................................................................................36 334 Cleaning after fabrication ........................................................................................................38 335 Assembly and erection............................................................................................................38 335.1 Alignment.....................................................................................................................38 335.2 Flanged joints ..............................................................................................................38 335.11Field welds...................................................................................................................38 336 Packing, preservation, marking, and shipping ........................................................................39 Page 2 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) 337 Deliverables ............................................................................................................................39 338 Order of precedence ...............................................................................................................39 Chapter VI Inspection, examination, and testing..............................................................................41 340 Inspection................................................................................................................................41 340.2 Responsibility for inspection ........................................................................................41 340.3 Rights of the owner’s inspectors..................................................................................41 341 Examination ............................................................................................................................41 341.3 Examination requirements ...........................................................................................41 341.4 Extent of required examination ....................................................................................42 342 Examination personnel ...........................................................................................................44 342.1 Personnel qualification and certification ......................................................................44 344 Types of examination..............................................................................................................44 344.1 General ........................................................................................................................44 344.2 Visual examination.......................................................................................................44 344.5 Radiographic examination ...........................................................................................45 344.6 Ultrasonic examination ................................................................................................45 344.7 In-process examination................................................................................................46 345 Testing ....................................................................................................................................46 345.2 General requirements for leak tests.............................................................................46 345.4 Hydrostatic leak test ....................................................................................................47 Appendix E Reference standards ....................................................................................................49 Appendix J Nomenclature ................................................................................................................51 Appendix Q Quality System program...............................................................................................53 Appendix AA Requirements for carbon steels, low alloy steels and martensitic stainless steels ....54 AA.1 Scope......................................................................................................................................54 AA.2 Welding ...................................................................................................................................54 AA.2.1Welding processes ......................................................................................................54 AA.2.2Filler metal ...................................................................................................................54 AA.2.3Shielding gases ...........................................................................................................54 AA.2.4Purge gas ....................................................................................................................55 AA.2.5Preheat and interpass temperature .............................................................................55 AA.3 Welding procedure qualification..............................................................................................55 AA.3.1Essential variables.......................................................................................................55 AA.3.2Charpy V-notch impact testing.....................................................................................55 AA.3.3Hardness determination...............................................................................................56 AA.4 Production welding..................................................................................................................56 AA.4.1Interrupted welding ......................................................................................................56 Page 3 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) AA.5 Post-weld heat treatment (PWHT) ..........................................................................................57 AA.6 Bending and forming...............................................................................................................58 Appendix BB Requirements for 300 series austenitic and high alloy austenitic stainless steels, 6%mo alloys, nickel base alloys, and cupro nickel ............................................................................59 BB.1 Introduction .............................................................................................................................59 BB.2 Welding ...................................................................................................................................59 BB.2.1Welding processes ......................................................................................................59 BB.2.2Filler metal ...................................................................................................................59 BB.2.3Shielding gas ...............................................................................................................60 BB.2.4Backing gas .................................................................................................................60 BB.2.5Preheat and interpass temperature .............................................................................60 BB.2.6Heat input ....................................................................................................................60 BB.3 Welding procedure qualification..............................................................................................60 BB.3.1Charpy V-notch impact testing.....................................................................................60 BB.4 Post-weld heat treatment (PWHT) ..........................................................................................61 BB.5 Bending...................................................................................................................................62 BB.6 Cleaning, pickling, and passivating of stainless steels ...........................................................62 Appendix CC Requirements for 22 Cr duplex and 25 Cr super duplex stainless steel materials ....63 CC.1 Introduction .............................................................................................................................63 CC.2 Welding ...................................................................................................................................63 CC.2.1 Welding processes.....................................................................................................63 CC.2.2 Filler metal..................................................................................................................63 CC.2.3 Shielding gas..............................................................................................................64 CC.2.4 Backing gas................................................................................................................64 CC.2.5 Joint geometry............................................................................................................64 CC.2.6 Heat input...................................................................................................................65 CC.2.7 Preheat and interpass temperature ...........................................................................65 CC.3 Welding procedure qualification..............................................................................................65 CC.3.1 P-numbers..................................................................................................................65 CC.3.2 Positional welding ......................................................................................................65 CC.3.3 Metallurgical qualification ...........................................................................................65 CC.3.4 Charpy V-notch impact testing ...................................................................................66 CC.3.5 Hardness determination .............................................................................................67 CC.3.6 Essential variables .....................................................................................................67 CC.3.7 Corrosion testing ........................................................................................................67 CC.4 Welder qualification.................................................................................................................68 CC.5 Production welding..................................................................................................................68 Page 4 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) CC.5.1 General ......................................................................................................................68 CC.5.2 Repair welding ...........................................................................................................69 CC.6 Bending...................................................................................................................................69 Appendix DD Requirements for titanium and zirconium ..................................................................70 DD.1 Introduction .............................................................................................................................70 DD.2 Cleaning and preparation for welding .....................................................................................70 DD.3 Welding ...................................................................................................................................70 DD.3.1 Welding process.........................................................................................................70 DD.3.2 Filler metals................................................................................................................70 DD.3.3 Shielding gases..........................................................................................................71 DD.3.4 Backing gas................................................................................................................71 DD.3.5 Preheat and interpass temperature ...........................................................................72 DD.3.6 Interpass cleaning ......................................................................................................72 DD.4 Welding procedure qualification..............................................................................................72 DD.4.1 Charpy V-notch impact testing ...................................................................................72 DD.4.2 Hardness determination .............................................................................................72 DD.5 Welder qualification.................................................................................................................72 DD.6 Production welding..................................................................................................................73 DD.6.1 General ......................................................................................................................73 DD.6.2 Weld bead discolouration...........................................................................................73 Appendix EE Requirements for automated gas tungsten arc welding (GTAW)...............................74 EE.1 Introduction .............................................................................................................................74 EE.2 Welding equipment .................................................................................................................74 EE.3 Welding consumables.............................................................................................................74 EE.3.1Tungsten electrodes ....................................................................................................74 EE.3.2Penetration enhancing flux ..........................................................................................74 EE.4 Tube end preparation..............................................................................................................75 EE.5 Welding procedure qualification..............................................................................................75 EE.6 Welder performance qualification ...........................................................................................75 EE.7 Non-destructive testing ...........................................................................................................76 EE.8 Non-destructive testing acceptance criteria for small bore tubing ..........................................76 EE.9 Weld repairs............................................................................................................................76 Bibliography .....................................................................................................................................77 List of Tables Table 300.4 - Status of appendices in B31.3 ...................................................................................11 Table 328.5.1 - Acceptable welding processes................................................................................28 Table 331.1.6 - Number of thermocouples required for pipe spools ................................................34 Page 5 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Table 341.1.4A - Method and extent of non-destructive testing (NDT)............................................43 Table 342.1A - Qualification of inspection personnel.......................................................................44 Table AA.3.2.1 - Charpy Impact Test Requirements for Carbon Steel ............................................56 Table AA.3.2.2 - Charpy Impact Test Acceptance Criteria for Carbon Steel ...................................56 Table CC3.6 - Qualified thickness range .........................................................................................67 Table DD.6.2C - Weld bead discolouration......................................................................................73 List of Figures Figure 328.2A - Charpy notch locations...........................................................................................18 Figure 328.2B - Location of hardness indents .................................................................................21 Figure 328.4.3A - Dimensional tolerances for fabricated pipework..................................................25 Figure 331.2.6 - Local heat treatment for branch connections.........................................................36 Figure 332.2.3 - Segmental bends...................................................................................................37 Page 6 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Foreword The previous issue of GIS 42-103 was retired 20 April 2016. This Specification is a reinstatement of GIS 42-103 based on part of the following documents that are now retired: Company EP-GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3). RM-GIS 42-103 Specification for Fabrication, Assembly, Erection and Inspection of Pipework (ASME B31.3). This Specification incorporates the following technical changes with respect to EP-GIS 42-103: Modifications to the weld procedure qualification essential variable requirements. Modifications to PWHT requirements. Modifications to NDT requirements. Modifications to pressure test requirements Revisions to the Appendices of this specification. This Specification contains the same technical content as GPO-EN-SPE-42103 Rev. B03. Page 7 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Introduction a. Requirements for fabrication, assembly, erection, and inspection of pipework are based on American Society of Mechanical Engineers (ASME) B31.3, Process Piping, 2018. 1. Chapter I Scope and definitions. 2. Chapter V Fabrication, assembly and erection. 3. Chapter VI Inspection, examination and testing. b. Requirements of this Specification are modifications to ASME B31.3. c. Modifications to ASME B31.3 are identified as Add, Modify to Read, or Delete. d. Paragraph numbers in this Specification correspond to ASME B31.3. e. Paragraphs of ASME B31.3 that are not revised remain applicable. Page 8 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Chapter I Scope and definitions 300 General statements 300.1 Scope Add (a) This Specification provides requirements, recommendations, and permissions for the, materials, fabrication, inspection, testing, documentation, and preparation for the onshore and offshore process and utility piping systems fabricated in carbon and low alloy steels, stainless steels, cupro-nickel, nickel based alloys, titanium alloys, and zirconium alloys that are within the scope of ASME B31.3. (b) If included in the Purchase Order, the requirements in this Specification can be applied to the following: (1) Fabrication of subsea pipework and components. (2) Welded seams in fabricated pipe fittings (tees, elbows, reducers, etc.). (3) Welded attachments to valve bodies include attachment of welded pups. (4) Pipework fabricated in conformance to ship classification society rules. (c) If specified in the package equipment specification or the Purchase Order, this Specification applies to all piping fabrication including prefabrication, module assembly, package or skid mounted units, and site and field installation. 300.1.3 Exclusions Add (e) Land based pipelines and flowlines. (f) Subsea pipelines, flowlines, and risers. (g) Pipelines of length and diameter that are specified by Company to be engineered as main pipelines (e.g., transfer lines between processing units, storages, and jetties). (h) Steam piping systems within plot limits of power stations and steam generating stations outside process areas. (i) Underground drainage systems. (j) Heating, ventilation, and air conditioning (HVAC) piping systems, including chilled water, hydronic heating, drains, and refrigerant systems. (k) Domestic water and waste water systems within buildings, including offshore accommodation modules. 300.2 Definitions Add For the purpose of this Specification, the following terms and definitions apply: Page 9 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Arc energy Energy input calculated from welding current, arc voltage, and welding travel speed. Terms arc energy and heat input are interchangeable in this Specification. Company BP p.l.c, an associate or subsidiary, or other organization acting as owner, Company, or customer as designated in Purchase Order. Company responsible engineer Company engineer responsible for the technical requirements of the item. Interpass temperature Temperature at weld joint prior to initiation of welding arc. Fabricator Site piping contractor or package supplier. Manufacturer Entity or sub-supplier producing equipment item. Preheat temperature Minimum metal temperature that welding can take place. Quality plan Document specifying which procedures and associated resources will be applied, who will apply them, and when these procedures and resources will be applied to a specific project, product, process, or contract. Sub-Supplier Contractor or vendor of Supplier. Supplier Entity entering into a contract with Company to provide materials, goods, supplies, equipment, or plant and includes successors and (or) permitted assigns of such entity. Page 10 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) 300.4 Status of appendices Table 300.4 - Status of appendices in B31.3 Add Appendix Title Status AA Requirements BB Requirements for carbon, low alloy steels, and martensitic stainless steels Requirements for 300 series austenitic and high alloy austenitic steels, 6%Mo alloys, nickel based alloys, and cupro-nickel CC DD EE Requirements for 22 Cr duplex and 25 Cr super duplex stainless steel materials Requirements for titanium and zirconium Requirements for automated GTAW Requirements Requirements Requirements Page 11 of 70 Requirements 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Chapter V Fabrication, assembly, and erection 327 General Add 327.1 Control of welding and fabrication Unless otherwise approved by Company responsible engineer, welding and fabrication activities shall take place within constraints in accordance with the certified quality management system. 327.1.1 Initial documentation (a) Quality plan (1) Prior to the commencement of fabrication, a quality plan shall be submitted to and subject to approval by Company responsible engineer. (2) The quality plan shall detail the full scope of activities related to the fabrication, inspection, testing, and erection of pipe spools. (b) Fabricator’s responsible personnel (e.g., welding engineer, welding inspector(s), quality engineer, NDT coordinator, and foreman) shall be identified. (c) Manufacturing procedures (fabrication and welding procedures) (1) Associated manufacturing procedures shall be submitted and subject to approval by Company responsible engineer. (2) Manufacturing procedures shall include the following: (a) Material control and storage. (b) Welding consumable storage and control in conformance to welding consumable manufacturer’s recommendations. (c) PMI for alloy materials, including welding consumables, deposited weld metal, and consumable insert rings, in conformance to EP-GIS 36-103 or RM-GIS 36-103. (d) WPS and associated PQR. (e) NDT procedures and qualifications. (f) Mechanical working. (g) Heat treatment. (h) Portable hardness testing. (i) Hydrostatic leak testing. (j) Pneumatic testing (specified for piping system or otherwise approved by Company responsible engineer). (k) Sensitive leak testing. Page 12 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) (d) Previously qualified welding procedures (1) Previously qualified WPS’ may be used if they: (a) Conform to this Specification. (b) Conform to the welding procedures clause of EP-GIS 18-011 or RM-GIS 18-011. (c) Are approved by Company responsible engineer. (2) Previously qualified WPSs shall include a summary table that lists the following: (a) WPS number. (b) PQR number. (c) Essential and supplemental essential variables listed in the applicable industry code and this Specification. (d) Areas of intended application including a weld map or sketch identifying types of joint to be welded and procedures to be applied. (e) NDT reports and results on existing PQR samples. (3) For a WPS using multiple processes, preference shall be given to a single PQR. (4) Original mechanical test certificates or certified copies shall be included in information package. (5) Photographic records shall be included in information package, with each region of weldment and any associated hardness measurements being visible. (e) pWPS documents (1) pWPS documents for new welding procedures or welding procedures requiring requalification shall be submitted for Company review and approval before fabrication of test pieces. (2) pWPS documents shall be indexed and presented in legible form with a summary table as detailed in 327.1.1(d)(2). (f) Results, related data, and photographic records of pWPSs, WPSs, and PQRs shall be submitted in an electronic format. (g) Copies of approved WPS in welder’s first language shall be available for reference to welder at all times during production welding. 327.1.2 Production documentation (a) Fabricator shall maintain production records. (b) Production records shall include: (1) Material and welding consumable certificates. (2) PWHT records (PWHT is applied) including PWHT chart. (3) Visual and dimensional inspection. (4) NDT and pressure test records. (5) Isometric drawings or weld map marked up with weld numbers and applicable WPS and PQR. Page 13 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) (6) Welder and welding operator qualification test records. (7) Authenticated copies of NDT operator(s) certificates. (8) Records of agreed concessions to fabrication standards. (c) On completion of fabrication, records shall be either given to Company or stored by fabricator, as directed by fabrication contract. Unless otherwise specified in contract, storage shall be for a minimum of 5 yrs. 327.2 Health, safety, and environment (HSE) for welding operations HSE for welding operations shall comply with local laws and regulations. 327.3 Material control and storage (a) Materials shall be inspected on receipt to confirm that correct grade of material has been supplied and that the following conform to applicable standards and specifications: (1) Identification. (2) Dimensions. (3) Material quality. (4) End preparation. (b) PMI can be required for alloy materials on receipt of materials or prior to release for construction. PMI shall conform to EP-GIS 36-103 or RM-GIS 36-103 if specified in ITP. (c) Materials shall be stored under cover and above ground in a weatherproof enclosure or building using non-metallic dunnage. (d) While in storage, materials shall be kept free from dirt, grease, and other contaminants. (e) Valve supplier preservation shall be maintained until installation. (f) Following installation, valves shall be protected from ingress of dust, grit, and other solids. (g) Flange faces shall be coated with a suitable corrosion preventive and protected from mechanical damage during storage and fabrication. (h) End caps shall remain in place until material is selected for fabrication. (i) Different materials shall be kept in discrete sections of storage area. (j) Material shall be marked in a manner that allows traceability to original manufacturer certification. (k) Identification on each individual component shall be maintained through production processes to final product form. (l) Procedures for transfer of material identification marks shall be subject to approval by Company responsible engineer prior to commencement of fabrication. (m) Material that is not identifiable shall be removed from work area and quarantined until material grade and source can be confirmed. Page 14 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) 327.4 Pipework marking (a) Pipework shall be identified by indelible marking: (1) Free from low melting point metallic materials, sulphides, chlorides, and others containing halides or other halogens. (2) Placed at least 100 mm (4 in) from weld preparation. (b) Marking shall have minimum life of 1 yr in covered, unheated storage. (c) Transfer of identification markings shall take place prior to cutting. (d) Acceptable techniques for identification transfer shall include: (1) Permanent marker or paint pen (typical method). (2) Vibro-etching. (3) Hard stamping with low stress stamps. (4) Adhesive tapes with or without bar codes. (e) Marking shall identify material, fabricator, and include item number, enabling spool to be traced to corresponding isometric drawing. 327.5 Fabrication facilities (a) A shop that manufactures both carbon and/or low alloy steels and high alloy steels at the same facility shall ensure that the areas used for fabrication are separate and in conformance to the following: (1) Each alloy type is segregated during fabrication. (2) The following equipment shall be segregated or thoroughly cleaned before switching materials: a) Pipe handling equipment. b) Pipe end preparation machines. c) Rollers. d) Line-up clamps. e) Other jigs and fixtures. (3) Separate sets of clearly identified cleaning and grinding equipment are provided. (4) The following low melting point metals, and their alloys are not permitted to contact materials that will undergo hot forming, welding, or PWHT or that subsequently will be placed in elevated temperature service: a) Aluminium. b) Lead. c) Tin. d) Copper. e) Zinc. f) Cadmium. g) Mercury. Page 15 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) (b) Shop layout, equipment, and production procedures shall be subject to approval by Company responsible engineer. (c) Scrap materials shall be removed from fabrication area and disposed of in conformance to fabrication contract requirements. 327.6 Welding equipment (a) Welding power source voltage and amperage meters shall be calibrated on an annual basis and recorded in QMS. (b) If conducting QC checks of parameters during production welding, calibrated instrumentation shall be used. (c) Systems shall be in place to allow traceability of calibration back to national standards. 328 Welding and brazing 328.2 Welding and brazing qualification Add (a) General requirements (1) WPS and PQR results shall be subject to approval by Company responsible engineer before commencement of fabrication. (2) PQRs shall be mechanically tested at an independent laboratory accredited to a national or international standard and certified by the fabricator. (3) If included in the Purchase Order or Company responsible engineer option, mechanical testing shall be witnessed by a third party. (b) Weld procedures qualified for subsea piping shall conform to the following: (1) Impact testing, including weld metal centreline, fusion line, and fusion line +2 mm (+0.08 in) specimens are as shown in Figure 328.2A. (2) For material thicknesses (a) Less than 20 mm (0.8 in) - Charpy specimens are taken from external surface. (b) Greater than or equal to 20 mm (0.8 in) - Charpy specimens are taken from external and internal surfaces. (c) Greater than or equal to 50 mm (2.0 in) - Charpy specimens are taken from external and internal surfaces and mid-wall thickness. (3) Impact testing is performed at MDT unless specified otherwise in Appendix AA through Appendix DD. Page 16 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Figure 328.2A - Charpy notch locations. 2mm MAX WELD CENTRE LINE NOTCHES F L 2mm MAX FL + 2mm FUSION LINE (FL) AND HAZ NOTCH POSITIONS Note: 1 Refer to 328.2.(b). (4) Charpy specimens are cut transverse to weld, with axis of notch perpendicular to surface of test piece. Page 17 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) (5) Weld metal Charpy impact specimens are machined such that notch is located at weld metal centreline. (c) Backing rings shall not be allowed. (d) In exploration and production, socket welds shall not be permitted in sour service applications. (e) For subsea applications, any change in material grade shall require re-qualification, unless subject to approval by Company responsible engineer. (f) During PQR, procedure data and essential variables shall be recorded on a pass-by-pass basis using a calibrated arc monitoring system subject to approval by Company responsible engineer. (g) In addition to requirements of ASME Section IX, following are considered essential variables: (1) A change greater than ±10% of welding parameter range recorded in PQR or a change in heat input range recorded on PQR. (2) A change in type of current (e.g., AC to DC or, in DC welding, a change in electrode polarity) except if type of current changes within electrode manufacturer recommendations. (3) A change from a double-sided to a single-sided weld preparation. (4) An increase in maximum interpass temperature above that recorded on the PQR. (5) Unless otherwise approved by Company Responsible Engineer, a change in consumable classification and trade name. (6) For exploration and production applications, a change in base material carbon equivalent of ± 0.03 or a change in carbon content of ± 0.02%. (7) A change from vertical up welding to vertical down welding or vice versa. (h) Requalification shall be performed for critical applications identified by Company. (i) Weldment hardness testing for qualifying a new PQR (1) For applications designated as sour service, root passes made by FCAW are not permitted: (a) Pipe and fittings welded with FCAW shall conform to NACE SP0472 for weld procedure HAZ hardness controls. (b) Base metal chemistry controls shall conform to NACE SP0472 if welds are not post weld heat treated. (c) Root passes made by FCAW are not permitted. (2) Hardness testing (a) A limitation on weldment hardness is specified in Appendix AA through Appendix DD. Metallographic examination and hardness measurements also shall form part of PQR. (b) Sections for hardness testing shall be prepared to a 1 μm (39 μin) diamond paste finish and etched to reveal microstructure. Page 18 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) (c) Indents (1) Each hardness survey shall consist of three rows of indents. Only mid wall traverse is required on thin wall if OD and ID measurements are not possible. (2) One traverse shall be located below the cap, one above root (or internal surface), and one at mid thickness. The positions are shown in Figure 328.2B. (3) Mid thickness traverse may be waived for single sided welds below 12.7 mm (0.5 in). (4) Hardness survey shall sample CGHAZ adjacent to fusion boundary (see Note 2 below in Figure 328.2B). (5) Additional hardness indent positions shall be performed if a consumable type has not been sampled by specified three traverses. (6) For exploration and production, conformance to NACE MR0175/ISO 15156 for sour service, additional indents shall be made at specified locations (7.3 of NACE MR0175/ISO 15156 Part 2). (7) For refining and petrochemical applications, hardness traverses shall also conform to ISO 17945 (NACE MR0103). Figure 328.2B - Location of hardness indents 1 - 2mm t/2 1 - 2mm Notes: 1. Parent material indentations shall be at least 20 mm (0.8 in) from fusion line. 2. First HAZ indentation shall be placed as close as possible to fusion line. Further indentations into HAZ shall be separated by approximately 0,5 mm (0,02 in). However, minimum centre to centre separation requirement of 2.5 times or 3 times mean diagonal of nearest indentation shall be maintained (see ISO 6507-1 and ASTM E92). 3 Same survey pattern shall be applied to double-sided welds. For double sided welds, mid thickness traverse shall be located to sample root region of the weld. (d) Hardness measurements in weld metals and HAZs shall be performed using Vickers pyramid method (5 kg or 10 kg). (e) Vickers hardness readings shall not be converted from other hardness scales. (f) Digital macro photographs (approximately 3x to 10x) showing location of each hardness impression shall be prepared and included in welding procedure qualification documentation. Page 19 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) (g) Location of the hardness indents in HAZ shall be clearly visible. (j) In addition to mechanical testing, PQR samples shall be subjected to the same NDT techniques and requirements as those for production welds. (k) NDT shall be completed prior to machining of test pieces. (l) Pipe diameters up to and including DN 65 (NPS 2 1/2) shall be GTAW welded throughout. (m) Welder performance qualification (1) Welders and welding operators: (a) For duplex stainless steel weld metals and parent materials (Appendix CC) and titanium and zirconium (Appendix DD), shall be qualified before work on production welds. (b) Subject to the provision of an authenticated performance qualification record and approval by Company responsible engineer, may be qualified on initial production welds. (2) New welder and welding operator qualification tests shall be subject to witnessing by Company if not waived by Company responsible engineer. (3) Any welder who, in opinion of Company responsible engineer, is either ignoring good welding practice or specification requirements or is responsible for a high level of repairs during production shall: (a) Be removed from work. (b) Undergo a retraining programme subject to approval by Company responsible engineer before a retest is considered. Add 328.2.5 Test joints (a) Unless otherwise approved by Company responsible engineer, PQR for impact tested P1 steels and all higher P-number materials shall be performed on a pipe or pipe fitting. (b) If castings are to be welded in production, qualification shall be performed on castings. (c) Plate qualified welding procedures on pipe sizes less than DN 200 (NPS 8) shall be subject to approval by Company responsible engineer. (d) Welder performance tests shall be performed on pipe. (e) Unless approved otherwise by Company responsible engineer, welder performance tests shall use welding consumables of nominally the same chemical analysis as production material. Page 20 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) 328.3 Welding materials 328.3.1 Electrodes and filler metal Add (f) For exploration and production applications, storage and control of welding consumables shall conform to EP-GIS 18-011. (g) For refining and petrochemical applications, storage and control of welding consumables shall conform to RM-GIS 18-012. 328.3.3 Consumable inserts Modify to Read Use of consumable inserts shall be subject to approval by Company responsible engineer. Add 328.3.4 Welding gases (a) Gases used for shielding and purging shall conform to ANSI/AWS A5.32 or ISO 14175. (b) Gas containers shall be labelled with grade and brand name as specified in WPS. (c) Gases shall: (1) Be pre-mixed and bottled by gas supplier unless otherwise approved by Company responsible engineer. (2) Have certificates of conformance. (3) Be held in containers in which they are supplied and stored, with adequate support, in a secured area. (d) Standard Ar/CO2 compositions may be mixed at site if: (1) Approved by Company responsible engineer. (2) Mixing system is part of a mechanized process using a failsafe cut off and/or alarm if proportions fall outside those specified in the approved welding procedure. (e) Gas mixtures containing hydrogen shall not be used for either shielding or purging unless approved by Company responsible engineer. 328.4 Preparation for welding 328.4.1 Cleaning Add (a) Working practices shall be designed to minimize contamination. (b) Before welding, internal and external surfaces shall be cleaned for a distance of at least 50 mm (2 in) from fusion face. (c) Surfaces to be joined by welding shall be wire brushed and degreased immediately prior to welding. Page 21 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) (d) For small pipes that are not abrasively cleaned, chemical cleaning is acceptable using a chemical approved by Company responsible engineer. (e) Degreasing agents shall leave no chloride or sulphide containing residues on surface. (f) 328.4.2 Methanol shall not be used for degreasing titanium and zirconium. End preparation (a) General Add (3) Materials shall be cut to size and bevelled by: (a) A thermal cutting technique (oxy fuel gas or plasma arc). (b) Cold cutting. (c) Machining. (d) Abrasive grinding. (4) Zirconium and titanium preparation shall be in accordance with Appendix DD. (5) Pipe ends shall be prepared perpendicular to the longitudinal axis of the pipe. (6) Tolerance on out-of-squareness shall be ±1.5 degrees. (7) Prior to plasma cutting, prepared surfaces shall be cleaned by degreasing agent. (8) For plasma cutting, surfaces adjacent to cut shall be cleaned by grinding or wire brushing to shiny metal before cutting. (9) After thermal cutting, surfaces shall be ground to remove heat tinted metal, smooth profile, and returned to shiny metal finish. (10) Holes for branch connections less than or equal to 25 mm (1 in) diameter shall be drilled. (b) Circumferential welds (2) Add Joint preparations with internal tapers or thickness transitions immediately adjacent to weld bevel shall not be used if UT is primary means of NDT. (4) Modify to Read Weld metal buttering shall not be deposited to assist alignment or provide material for machining without approval of Company responsible engineer. Add (7) Prior to fit-up, weld bevels shall be subject to VT. (8) VT may be supplemented by MT for ferrous materials or PT for non-ferrous materials. 328.4.3 Alignment (a) Circumferential welds Page 22 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Add (3) Bore misalignment in circumferential butt joints shall not exceed lesser of either 0.1t of wall thickness, “t”, or 3 mm (0.12 in) without approval by Company responsible engineer. (c) Branch connection welds (3) Add Weld metal shall not be deposited to correct the contour, shape, or tolerances without approval by Company responsible engineer. Add (4) Proprietary branch connections shall be welded in conformance to the branch fitting manufacturer guidelines. Add (e) Fabrication tolerances (1) Fabrication tolerances shall conform to Figure 328.4.3A, unless subject to approval by Company responsible engineer. (2) Design changes necessary to conform to defined tolerances when welding austenitic stainless steels shall be subject to approval by Company responsible engineer. Page 23 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Figure 328.4.3A - Dimensional tolerances for fabricated pipework A CL B A C CL C/L FLANGE OR BRANCH CL A D A A CL A E Maximum allowable dimensional tolerance Item Category D and normal fluid service Severe cyclic conditions, temperature 450°C (850°F) rating PN 150 (Class 900) A 3 mm (±1/8 in) maximum from indicated dimension - From face to face, centre to face, location of attachments, etc. B 8% maximum (for internal pressure) 2% maximum 3% maximum (for external pressure) Flattening measured as difference between maximum OD and minimum OD at any cross section C 3 mm (±1/8 in) maximum lateral translation of branches or connections D 1.5 mm (±1/16 in) maximum rotation from the indicated position, of flanges measured as shown E 0.75 mm (0.03 in) maximum out of alignment of flanges from indicated position, measured across any diameter 328.5 Welding requirements 328.5.1 General 1.5 mm (±1/16 in) maximum lateral translation of branches or connections 0.4 mm (0.016 in) maximum out of alignment of flanges from indicated position, measured across any diameter (b) Modify to Read Each qualified welder and welding operator shall be assigned an identification symbol. Welds shall be marked with welder (welding operator) identification symbol using Page 24 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) marker pencils or paints that conform to 327.4. In lieu of marking weld, records shall be filed subject to approval by Company responsible engineer. (c) Modify to Read Tack welds (1) Tack welds shall be deposited by a qualified welder in conformance to an approved WPS. (2) Tack welds shall be deposited using the preheat level specified in the WPS. (3) The base metal temperature for tack welds shall be at or above the specified preheat temperature for a distance not less than 25 mm (1 in) in all directions from the point of welding. (4) Root tack welding shall be subject to approval by Company responsible engineer. (5) Root tack welding shall not commence until the specified level of bore purging has been established in conformance to the WPS. (6) Root tack welds shall be removed. (7) Interval between tack welding and deposition of root pass shall be minimized to reduce contamination. (8) Removal of bridge tacks shall be by mechanical grinding. (d) Modify to Read Peening shall not be permitted on any pass. Add (g) Unless stated otherwise in valve manufacturer installation instructions, welding adjacent to inline valves shall be performed with valve in full open position. (h) Self-shielded FCAW process shall not be used. (i) For exploration and production applications, acceptable welding processes are shown in Table 328.5.1. (j) For refining and petrochemical applications, acceptable welding processes shall be based on API RP 582, with specific modifications to be advised by the engineering design or project specification. Page 25 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Table 328.5.1 - Acceptable welding processes GTAW Butt welds ≤ DN 65 (NPS 2-1/2) Root pass of all materials P-No 4 and greater regardless of diameter Root pass of all compressor pipework downstream of the inlet suction scrubber 2nd (hot) pass if GTAW was used for the root pass Piping ≤ DN 150 (NPS 6) Piping > DN 150 (NPS 6) Root and 2nd (hot) pass of CS/ Low Alloy/ Martensitic SS if not already required elsewhere in this Specification Root and 2nd (hot) pass of 3xx SS/High Alloy Austenitic SS/ 6Mo alloys/Ni base alloys/CuNi/Duplex Fill/cap passes of 3xx SS/high alloy austenitic SS/6Mo alloys/Ni base alloys/CuNi with wall >5 mm (3/16 in) and fillet welds Fabrication of process pipework Fabrication of utility pipework Titanium and Zirconium SMAW SAW Required Not permitted Not permitted Required Not permitted Required (1) FCAW (gas shielded) GMAW PAW Not permitted Not permitted Not permitted Not permitted Not permitted Not permitted Not permitted Not permitted Not permitted Not permitted Not permitted Not permitted Preferred Acceptable (2) Not permitted Acceptable Acceptable Acceptable Preferred Preferred Acceptable (2) Acceptable Not permitted (3) Acceptable Not permitted (4) Acceptable Not permitted (4) Acceptable Not permitted (4) Acceptable Preferred Acceptable Not permitted Not permitted Acceptable Acceptable Required Not permitted Not permitted Not permitted Acceptable Not permitted Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Not permitted Acceptable (5) Acceptable Not permitted Not permitted (4) Acceptable Not permitted Not permitted (4) Acceptable Not permitted Acceptable Acceptable Acceptable Notes: 1. Back purging shall also be used regardless of P-No or alloy content. 2. SMAW is acceptable if electrode size ≤ 2.4 mm (3/32 in). 3. Not acceptable unless welder has consistently demonstrated his ability to use SAW on pipe of these diameters. 4. Unless specifically approved by Company responsible engineer. 5. For 300 SS/high alloy austenitic SS/6Mo alloys/Ni base alloys/CuNi/Duplex, subject to approval by Company responsible engineer. Page 26 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) (k) GTAW equipment shall use either a high frequency starting unit or alternative programmed touch starting unit. A current decay device should also be installed, together with a gas lens, to improve gas shielding of weld pool. (l) Composition of shielding gas used for welding shall be compatible with alloy being welded. (m) Welding processes that are gas shielded shall be used only under enclosed shop conditions, unless weather protection is provided, subject to approval by Company responsible engineer, at each outdoor location in which such techniques are used. (n) Back purging (1) Back purging using high purity argon shall be used if welding materials of P5B and greater (i.e., greater than or equal to 2 1/4% Cr content) to prevent unacceptable levels of oxidation or coking of the root run and internal pipe surface. (2) Internal purging shall be used if welding attachments to materials of P5A and greater with a wall thickness less than or equal to 10 mm (0.40 in). (3) For exploration and production applications, oxygen meters shall be used to monitor the quality of the purge gas on all materials of P6 and greater. (4) For exploration and production applications, maximum oxygen content of purge gas shall not exceed 0.2% (2 000 ppm). (5) Gas mixtures, including mixtures containing hydrogen, shall not be used for back purging, unless approved by Company responsible engineer. (6) Purge gas flowrate shall be maintained for a minimum of four weld passes or 10 mm (0.4 in) of deposited weld metal to minimize the ingress of oxygen. (o) Temporary attachments and their welds. (1) Temporary attachments to outside surface of pipe shall be subject to approval by Company responsible engineer. (2) Temporary attachments shall conform to a WPS subject to approval by Company responsible engineer. (3) Attachments that are permitted shall be made in a manner to avoid oxidation of internal surface of pipework. (4) Fabricator shall advise precautions proposed to take with regard to fixing temporary attachments. (5) Temporary attachments shall be removed by cold cutting, leaving a 3 mm (0,12 in) stub. Stub shall be ground flush with pipe wall. (6) Following removal of attachments, pipe wall shall be subject to a wall thickness UT check. Pipe wall surface shall be subject to MT/PT. (7) Temporary attachments shall be removed prior to application of any PWHT (refer to 328.5.1 (o) (5)). (p) Fillet welded joints for pressure containment should have at least two weld passes. Page 27 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) 328.5.3 Seal welds Modify to Read Seal welding of threaded connections specified by the engineering design or project specification shall conform to the following: (a) Threaded joints shall be assembled so that a maximum of three threads are exposed prior to welding. (b) Joints to be seal welded shall be made without use of tape or compound. (c) Welding shall be performed by a qualified welder in conformance to a WPS approved by Company responsible engineer. (d) Exposed threads shall be covered by the seal weld. (e) Welding shall not cause damage to threaded fitting. 328.5.4 Welded branch connections Add (j) When designing angled branch connections, in addition to considering stress concentration effects, access shall be provided for welding in acute angle section. (k) Branch connection welding shall conform to branch fitting manufacturer recommendations. 328.5.5 Fabricated laps Add Fabricated laps shall be subject to approval by Company responsible engineer. 328.5.6 Welding for severe cyclic conditions Add Weld reinforcement shall blend with external surface of pipe to minimize possible stress concentration effects. Add 328.5.7 Proximity of welds (a) Separation of toes of adjacent circumferential butt welds shall be at least: (1) Four times nominal wall thickness of pipe. (2) 50 mm (2 in) for pipe sizes DN 300 (NPS 12) and smaller. (3) 100 mm (4 in) for pipe sizes greater than DN 300 (NPS 12). (b) Separation of welded joints shall provide space for manipulation of the ultrasonic probes if weldments are to be examined by UT. (c) Branch and non-pressure part attachment welds (1) Welds shall not cross longitudinal seam or circumferential butt welds. (2) Welds shall be subject to toe-to-toe separation distance specified for circumferential butt welds if weld beads are not ground flush. (3) Toe-to-toe separation of welds shall be 50 mm (2 in) if weld beads are ground flush. Page 28 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) (4) If weld intersections with longitudinal seam or circumferential butt welds are unavoidable, main weld and footprint area of attachment shall be subject to NDT prior to making attachment weld. (d) Joints involving intersection of more than two welds shall not be permitted. (e) Longitudinal seam welds in pipes and fittings shall be separated by a minimum of 90 degrees. 328.6 Weld repair Add (a) As a minimum, any instance of cracking (except small crater cracks less than or equal to 4 mm [5/32 in] in length) or laminations shall be reported to BP welding engineer. (b) Cracked welds (with the exception of small crater cracks defined in (a)) shall be completely cut out of the pipework and the cause of cracking established to the satisfaction of the BP welding engineer. (c) Repair shall be subject to approval by Company responsible engineer prior to commencing further work on defective welds. (d) Crater cracks shall be removed by grinding and the surface shall be confirmed as free from cracks by MT or PT examination. (e) Detailed records of repairs, including individual welder repair rates, shall be retained by the fabricator. (f) Repair welding shall conform to an approved WPS and PQR. (g) Original WPS and PQR may be used for repairs. (h) A specific repair WPS and PQR shall be qualified for repairs that are performed with a welding process different than the original WPS and PQR. (i) Full penetration repairs shall be specifically qualified if root gap or joint preparation is outside limits of original PQR. (j) If impact testing is required, impact testing of repair weld procedures shall sample weld metal and both adjacent HAZs (i.e., HAZ in original weld metal and HAZ in parent material). (k) If back purging was applied with original WPS, back purging in conformance to 328.5.1(n) shall be applied for repairs in which depth of excavation leaves a thickness less than or equal to 10 mm (0.4 in). (l) Unless approved otherwise by Company responsible engineer, full circumference of repaired weld shall be re-inspected with techniques used for inspection of original weld. (m) No more than two repairs shall be attempted on any defective area unless otherwise approved by Company responsible engineer. (n) Prior to repair welding, excavated repair area shall be inspected by either PT or MT. 330 Preheating 330.1 General Add (a) Preheat shall be performed to an approved procedure. Page 29 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) (b) Preheat shall be applied by oxy fuel gas burners or electrical heating elements designed for preheat applications or by induction heating. (c) Cutting or oxyacetylene cutting torches shall not be used. (d) Pipework and components shall be free from surface moisture prior to the commencement of welding. (e) Minimum metal temperature for welding or thermal gouging shall be 10°C (50°F) or the preheat temperature specified on the WPS or gouging procedure. 330.1.1 Requirements Add Preheat temperature requirements shall conform to Table 330.1.1, unless specified otherwise in Appendix AA through Appendix DD. 330.1.3 Preheat temperature verification (b) Add Thermocouples shall not be directly attached to pressure parts unless subject to approval by Company responsible engineer. 330.1.4 Preheat zone Add (a) Preheat zone shall extend following distance beyond each edge of weld: (1) 75 mm (3 in) for a thickness less than or equal to 40 mm (1.6 in). (2) 150 mm (6 in) for a thickness greater than 40 mm (1.6 in). (b) Temperature shall be measured after removal of heating source (if gas heating) and following a delay of 1 min/12.5 mm (0.5 in) wall thickness with a minimum delay of 1 min. Add 330.1.5 Interpass temperature (a) Requirements for maximum interpass temperatures for specific alloys are provided in Appendix AA through Appendix DD. (b) Subject to approval by Company responsible engineer, weldments may be force cooled with dry air or water jackets to accelerate interpass cooling and maintain working efficiency. (c) The use of accelerated interpass cooling shall be qualified during weld procedure qualification. (d) Direct water spray quenching shall not be used on incomplete welds. (e) Water quenching or other means of accelerated cooling on weld completion shall be qualified during weld procedure qualification. Page 30 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) 330.2 Specific requirements Add 330.2.3 Dissimilar materials Modify to Read Dissimilar materials and weld deposited overlay (a) Dissimilar welds shall be subject to approval by Company responsible engineer. (b) Requirements concerning dissimilar metal welds shall conform to API RP 582 and be subject to approval by Company responsible engineer. (c) Weld deposited overlay shall conform to specific requirements if specified in Purchase Order documents by Company responsible engineer. 331 Heat treatment Add (a) Requirements for the heat treatment of individual materials are provided in Appendix AA through Appendix DD. (b) The PWHT exemptions and requirements for carbon steel as detailed in B31.32012 shall be adhered to using the 2012 version of Table 331.1.1. (c) Carbon steel materials thicker than 20 mm (3/4 in) shall receive PWHT. (d) ASME B31P-2017 provides alternative solutions if heat treatment is not possible or practical. Exemptions to PWHT shall be subject to approval by Company responsible engineer. 331.1 General Add Additional welding on assemblies that have been post weld heat treated shall not be permitted unless subject to approval by Company responsible engineer. 331.1.4 Heating and cooling Add Exothermic chemical reaction packs and direct flame heating shall not be used as a heat source. 331.1.6 Temperature verification (a) Add For pipe welds that are not heat treated in a furnace, number of thermocouples required shall be as Table 331.1.6. Table 331.1.6 - Number of thermocouples required for pipe spools Pipe diameter Up to DN 80 (NPS 3) Over DN 80 (NPS 3 and up to DN 350 (NPS 14) Over DN 350 (NPS 14) Number of thermocouples required 1 2 (to be placed 180 degrees apart) 4 (to be placed 90 degrees apart around weld) Page 31 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) (b) Add Procedures for attachment of thermocouples by capacitor discharge welding shall be subject to approval by Company responsible engineer. (c) Add Temperature measurements shall be recorded at intervals no greater than 15 min throughout heating, holding, and cooling cycles. Add (d) Heat treatment charts shall be provided to Company for each heat treatment. Add 331.1.7 Hardness tests (a) Unless otherwise approved by Company responsible engineer, production hardness testing shall conform to API RP 582 12.6.2 and GIS 36-102. (b) A master calibration of hardness testing equipment shall be performed annually by equipment manufacturer or at frequency specified by hardness equipment manufacturer. (c) Calibration of hardness testing equipment shall be checked locally on standards of similar hardness prior to its use. (d) Portable hardness testing equipment shall be suitable for the application and able to access the areas to be tested. 331.2 Specific requirements 331.2.3 Dissimilar materials Add Procedures for PWHT of dissimilar metals shall be subject to approved by Company responsible engineer. 331.2.4 Delayed heat treatment Modify to Read Delayed heat treatment shall be performed in conformance to Appendix AA.5c. 331.2.6 Local heat treatment Modify to Read (a) When local heat treatment is applied, weld shall be heated and insulated to ensure that (for a pipe of DN (NPS) “D” and wall thickness “t”): (1) Specified heat treatment temperature is achieved at weld. (2) Within distance of 1.8 Dt on both sides of weld, temperature of not less than half of specified heat treatment temperature is attained. (b) In the case of branch attachments, temperature gradient shall be such that a band of material from each crotch heated to temperature equalling half heat treatment temperature shall be 1.8 Dt (where “D” and “t” are nominal diameter and thickness of the main pipe and branch as appropriate) (see Figure 331.2.6). (c) In (a) and (b), “D” is expressed as DN (NPS), and “t” is expressed in mm (in). (d) Local heat treatment shall be applied by electrical heating. Page 32 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Figure 331.2.6 - Local heat treatment for branch connections 1.8 D1 t 1 1.8 D2 t 2 SHADED AREAS TO BE HEAT TREATED D NOMINAL O.D OF MAIN PIPE 1 D NOMINAL O.D OF BRANCH PIPE 2 t t 1 2 THICKNESS OF MAIN PIPE THICKNESS OF BRANCH PIPE Add 331.2.7 Heat treatment of welded valves in piping systems (a) Welded valves that are heat treated shall be locally heat treated rather than furnace heat treated. (b) Only pipe spools without valves may be furnace heat treated. 332 Bending and forming 332.2 Bending 332.2.3 Corrugated and other bends Add (a) Fabricated mitre (segmented) bends shall not be used unless approved by Company responsible engineer. (b) Subject to approval by Company responsible engineer, mitred (segmental) bends in conformance to Figure 332.2.3 may be proposed. (c) “Cut and shut” design shall not be used. Page 33 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Figure 332.2.3 - Segmental bends 30 60 90 TYPE A TYPE B TYPE C OVER 60 DEGREES 2 SEGMENTS DN 350 (NPS 14) & OVER OVER 30 DEGREES 1 SEGMENT DN 350 (NPS 14) & OVER ALL PIPE SIZES LONGITUDINAL SEAMS TO BE STAGGERED BY 90 DEGREES DIMENSION L REFER TO : PARAGRAPH 328.5.7 THESE ANGLES SHALL BE EQUAL 45 MIN. BUTT JOINT 60 MINIMUM 'L' BACK WELD TO BE APPLIED ON ALL JOINTS ' L' L LAP OR SLEEVE JOINTS SHALL NOT BE USED WITHOUT THE APPROVAL OF BP . SECTION AT THROAT OF BEND L WELD NECK FLANGE SLIP-ON FLANGE (HUB OR PLATE TYPE) Add 334 Cleaning after fabrication (a) Following fabrication and prior to shipment, piping shall be cleaned of loose scale, weld spatter, slag, sand, and other foreign material, both inside and out. (b) Shop coating requirements will be provided by Company. (c) For special fluid services, see Appendix F, F335.9. Page 34 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) 335 Assembly and erection 335.1 Alignment (a) Piping distortions Add (1) Application of heat for correction of minor distortions shall be performed in conformance to a procedure subject to approval by Company responsible engineer. (2) Heat correction shall be performed only on carbon and low alloy steels. (3) Use of heat correction shall be subject to witness by Company responsible engineer. 335.2 Flanged joints 335.2.5 Flanged Joint Assembly Add Flanged bolted joint assembly shall be performed in conformance to a procedure for each joint or group of joints to be assembled, subject to approval by Company responsible engineer. Add 335.11 Field welds (a) Subject to approval by Company responsible engineer, field welds may be fabricated using a WPS and/or PQR that is qualified and approved for shop fabrication. (b) Field welds shall be protected by wind and weather shielding as subject to approval by Company responsible engineer prior to commencement of welding or tacking. (c) Field welds may be inspected and tested using procedures and NDT techniques qualified and approved by Company welding inspector for shop inspection and testing. (d) Field welds shall be blast cleaned and painted to same standard as shop welds, unless otherwise approved by Company responsible engineer. 336 Packing, preservation, marking, and shipping (a) Preparation of equipment for transportation shall conform to packing, marking, and shipping instructions or other documents identified in Purchase Order. (b) Spools shall be identified with mark number assigned on drawing. (c) Method of marking shall be based on procedure subject to approval by Company responsible engineer. (d) Spools shall be marked (painted) at each end with spool mark number as shown on piping isometric. (e) Only Company approved marking methods free of chlorides, bromides, sulphur, and heavy metals shall be used. Page 35 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) (f) Shipping damage protection (1) Flanges shall be blanked with bolted or steel-strapped wood, plastic, or metal covers with rubber gaskets. (2) Covers shall have OD no smaller than flange or stub end OD. (3) Bevelled ends shall be protected by metal or plastic covers. (4) Tapped connections shall be fitted with threaded steel or non-threaded plastic pipe plugs. (5) Threaded ends shall be provided with steel or plastic thread protectors. (6) Other openings shall be protected to prevent entry of extraneous material. Tape, paper, cardboard, or plastic sheeting are not permitted. (7) Machined surfaces shall be coated with an anti-rust compound. 337 Deliverables Technical data, registers, documents, and drawings shall conform to requirements for Supplier information identified in Purchase Order. 338 Order of precedence (a) The order of precedence of the codes and standards quoted in the specifications shall be: (1) International and local statutory regulations. (2) Project data sheets. (3) Project specifications. (4) This Specification. (5) Referenced Company documents. (6) Referenced national and international codes. (b) Areas of apparent conflict between documents shall be brought to the attention of Company responsible engineer for resolution. (c) In the event of a conflict between this document and a relevant law or regulation, the relevant law or regulation shall be followed. If the document creates a higher obligation, it shall be followed as long as this also achieves full compliance with the law or regulation. (d) Design, engineering, procurement, and construction of equipment shall comply with the statutory laws and regulations of the final location of the asset. Refer to documents identified in the purchase documents for a list of these regulations. (e) For projects where the final location of the asset is in the EU: (1) Products supplied shall be confirmed to comply with applicable EU directives. (2) A Declaration of Conformity shall be provided. (3) CE mark shall be affixed to the package nameplate. (4) Components supplied shall be listed together with EU directives with which they comply and rationale by which compliance has been achieved. (5) A Technical File in compliance with applicable EU directives shall be compiled and retained for a period of 10 yrs. Page 36 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Chapter VI Inspection, examination, and testing 340 Inspection 340.2 Responsibility for inspection Add (a) Prior to start of manufacture, an ITP shall be subject to approval by Company responsible engineer. (b) The ITP shall: (1) Include inspection and testing activities to be performed, including those at sub-suppliers’ works. (2) Refer to all testing procedures, control documents, and resulting records and reports. 340.3 Rights of the owner’s inspectors Add Company and the Company appointed representative shall: (a) Have unlimited access to the following to inspect purchased equipment: (1) Workshops and testing facilities. (2) Sub-supplier workshops engaged in material supply or equipment fabrication. (b) Be authorized to photograph equipment in the Purchase Order scope during manufacturing, assembly, and test. 341 Examination 341.3 Examination requirements 341.3.1 General (a) Modify to Read Final examination shall be performed after completion of PWHT. For welds not subject to PWHT with base metal and/or filler metal with a SMYS greater than 490 MPa (70 ksi), a minimum 48 h hold time shall occur between completion of welding and the specified examination. Subject to approval by Company responsible engineer, the 48 h hold time may be reduced or eliminated if a hydrogen bakeout is performed. Add (c) If less than 100% examination is specified, each lot, as defined in 344.1.3, shall be approved prior to shipment of piping within that subject lot, unless otherwise approved by Company responsible engineer. 341.3.2 Acceptance Criteria (a) Welds Page 37 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Modify to Read ASME B31.3 Table 341.3.2 states acceptance criteria (limits on imperfections) for welds. See ASME B31.3, Figure 341.3.2 for typical weld imperfections. For subsea welds and welds classified as NDT Group 1, the acceptance criteria for severe cyclic conditions shall be applied. Welds classified as NDT Group 2 or Group 3 shall have criteria per normal service conditions unless otherwise approved by Company responsible engineer. 341.4 Extent of required examination Add (a) For all fluid categories, criticality rating of individual piping system, as specified by engineering design or project specification, shall specify the extent of required examination and inspection method used. (b) Method of determining criticality rating shall be subject to approval by Company responsible engineer. (c) Assigned values of criticality rating shall be recorded in piping line lists based on NDT group. (d) For guidance, method(s) and extent of NDT shall be based on Table 341.1.4A, subject to approval by Company responsible engineer. (e) For subsea applications, the following extent of examinations shall be applied, and defect acceptance criteria shall be “Severe cyclic conditions”. (1) 100% visual examination. (2) 100% radiographic or ultrasonic examination. (3) 100% MT or PT. Page 38 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Table 341.1.4A - Method and extent of non-destructive testing (NDT) NDT group Type of inspection Type of weld System service Pressure rating Design temp 1 100% VT All welds All systems All 100% RT or UT (3) Full pen. welds Class 600 (PN 100) and above 100% MT or PT All welds All systems except in NDT Group 1 Class 150 and 300 (PN 20 and PN 50) All Non-flammable and non-toxic services 10.35 barg (150 psig) -29°C (-20°F) to 185°C (365°F) 2 3 100% VT All welds 10% RT or UT (1), (2), (3) Full pen. welds 10% MT or PT (1), (2) Part. pen. and fillet welds 100% VT (2) All welds Notes: 1. 10% examination is minimum requirement for each welder and shall be defined as 100% examination of one weld in ten. Welds to be examined shall be selected such that work of each welder or welding operator is included. 2. If examination of a weld in NDT Group 2 or 3 reveals a defect, the requirements of 341.3.4 shall apply. 3. UT may be used in place of RT for pipe nominal thickness of 6 mm (0,25 in) and above. If PAUT is utilized, Vendor shall pass BP qualification test or other industry standard qualification test. 4. Services categorized as high temperature (MDT above 400°C [750°F]), low temperature (MDT below -50°C [-58°F]), sour (above region 0 in NACE MR0175), hydrogen, or lethal shall require 100% examination by VT, RT, or UT (see note 3), and MT or PT for all pressure ratings. 5. Attachment welds in thicknesses greater than 15 mm (0.6 in) shall be subject to 10% UT and 10% MT of each welder’s work. 6. For full penetration welds where 100% volumetric inspection cannot be achieved to code requirements, including weld-o-lets, the root pass shall be visually inspected. Inner diameters ≥2-in shall also be internally visually inspected using mirrors, borescopes, or other agreed equipment. Add 341.4.5 Socket welds A minimum of 5% of all socket weld joints (minimum one weld) shall be selected and examined for imperfections by radiography. The following applies: (a) Welds to be examined shall represent each welder’s work for each welding procedure used and spread throughout fabrication of designated lot. (b) Acceptance criteria shall be in conformance to Table 341.3.2 of ASME B31.3 for “Normal service conditions” unless “Severe cyclic conditions” is specified. (c) If a rejectable imperfection is revealed, the provision for progressive sampling examination in ASME B31.3 shall apply. 342 Examination personnel 342.1 Personnel qualification and certification Add (a) Unless otherwise specified by Company responsible engineer, personnel shall be qualified in conformance to Table 342.1A, following requirements and EP-GIS 18-011 or RM-GIS 18-011. Page 39 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Table 342.1A - Qualification of inspection personnel NDT Process Practitioner Qualification - ASNT, EN 473 or PCN (1) (2) (3) RT Supervisor or Technician carrying out interpretation ASNT Level 2 Technician ASNT Industrial Radiographer Level 1 / 2 UT Technician MT PT VT Technician Technician Technician ASNT Level 2 (Plate welds, butt welds, nodes – whichever is applicable) ASNT Level 2 ASNT Level 2 ASNT Level 2, AWS CWI, CSWIP 3.1, or PCN Level 2 Notes: 1. ASNT system shall be subject to a full conformance audit by Company prior to acceptance of ASNT system. Only externally independently assessed systems shall be permitted and shall be frequently monitored by an external ASNT Level 3. 2. Equivalent qualifications to other standards such as TWI-CSWIP, B-GAS, ISO 20807, ISO 9712, EN 473, or other national standard may also be acceptable subject to specific approval by Company responsible engineer. 3. NDT personnel responsible for acceptance of welds shall be qualified as a minimum to Level 2. (b) Personnel qualifications shall be subject to approval by Company responsible engineer. 344 Types of examination 344.1 General 344.1.3 Definitions Add Lot For purpose of this Specification, a lot for 5% random examination is defined as 20 welds. 344.2 Visual examination 344.2.1 Definition Add VT shall include examination of internal weld surface, if accessible. 344.5 Radiographic examination 344.5.1 Method Modify to Read (a) Single wall, single image technique shall be used if access to ID of pipe is possible (e.g., diameters above DN 600 [NPS 24]). (b) Double wall images may be used only if: (1) Pipe diameter is DN 250 (NPS 10) and less. (2) Access to ID is not possible. Page 40 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) (c) If using gamma ray isotopes such as iridium, lead intensifying screens and fine or very fine grain high-contrast film shall be used to achieve required ISO wire penetrameter sensitivities. (d) IQI sensitivity and film density for specific material thickness shall be in accordance with ASME Section V. (e) Four IQIs placed at 90-degree intervals shall be used to radiograph complete joint circumference in a single exposure. (f) Radiographic films shall be thoroughly dried and viewed with an illuminator conforming to ISO 5580. (g) Radiographic films shall be processed to allow storage without deterioration for a period of 5 yr or life specified in fabrication contract. (h) Set-on branch connections (1) Intermediate RT shall be performed on set-on branch (weld-o-let or similar) connections. (2) Film shall be on bore side of joint. (3) RT shall be performed if weld depth is flush to the wall thickness and before reinforcing fillet is applied. (4) Set-on branch welds shall be subject to volumetric examination (RT or UT) at same rate as required for specific main run piping class. (5) If required, root and final passes shall receive MT or PT. 344.5.2 Extent of radiography (c) Spot radiography Modify to Read Spot RT shall not be used for girth, mitre, or branch welds (i.e., 344.5.2(a) or 344.5.2(b) shall be used). 344.6 Ultrasonic examination Add (a) UT procedures for each joint configuration and thickness shall be subject to approval by Company responsible engineer. (b) UT examination shall be restricted to wall thicknesses: (1) Greater than 19 mm (3/4 in). (2) Down to 6 mm (1/4 in) if it can be demonstrated to Company that successful ultrasonic techniques can be implemented through qualification demonstrations and scan plan approval. (c) Following repairs to root and re-examination, weld shall be completed and subjected to final examination. (d) UT examination shall use scanning from all available internal and external surfaces to maximize coverage of weldment. (e) UT examination infers using PAUT and FMC. UT examination using manual shear wave technique may be used only if approved by Company responsible engineer. Page 41 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) 344.7 In-process examination 344.7.1 Definition Add (h) Subject to approval by Company responsible engineer, level of in-process examination shall be based on the following: (1) Criticality rating of pipework. (2) Complexity of welding. (i) Welding of duplex stainless steels, titanium, and zirconium shall be monitored as detailed in Appendix CC and Appendix DD. (j) Closure welds shall be considered criticality 1 and subject to 100% monitoring of activities associated with preparation and execution of welding and NDT. 345 Testing 345.2 General requirements for leak tests 345.2.3 Special provisions for testing (c) Closure welds Add Method statement detailing working sequence and applicable welding and NDT procedures shall be prepared and submitted for approval by Company responsible engineer. Add (f) 345.2.7 Existing plant Test procedures for newly fabricated pipe spools or other new equipment incorporated into existing plant prior to hydrostatic leak testing shall account for the limitations and precautions that might be necessary to avoid damage to the existing equipment. Test records Modify to Read Records shall be made of each piping system during testing, including: (a) Date of test. (b) Identification of piping system tested. (c) Test fluid. (d) Test pressure. (e) Certification of results by examiner. These records shall be retained after completion of test and given to Company in conformance to Company document control procedures. 345.3.1 Joints exposed (d) Modify to Read All joints may be primed and painted prior to leak testing unless a sensitive leak test (para 345.8) is required. It is considered acceptable to fully paint piping Page 42 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) subassemblies and piping systems (including welds) under the following conditions: (1) The welds consist of at least two layers, in accordance with a WPS qualified for the application. (2) The piping subassembly has been fabricated and inspected in accordance with this ETP. 345.4 Hydrostatic leak test Add (a) Fabricator hydrostatic test procedure shall include: (1) Details of test fluid. (2) Minimum temperature. (3) Test pressure. (4) Pressure recording. (5) Control method and holding time. (b) Hydrostatic test and any associated flushing procedure shall be subject to approval by Company responsible engineer. (c) Hydrostatic testing shall be performed after completion of heat treatment and NDT. (d) After hydrostatic testing, pipe spools to be stored prior to installation shall be treated as follows: (1) Spools: (a) Thoroughly dried. (b) Sealed at open ends to prevent ingress of dirt, moisture, or other contaminants. (c) Stored undercover and above ground on non-metallic dunnage. (2) Flange faces protected from corrosion and mechanical damage. (3) Need for a vapour phase inhibitor or biocide evaluated. 345.4.1 Test fluid Modify to Read (a) Fresh water shall be used unless otherwise detailed in Purchase Order. (b) General requirements of hydrotesting are as specified below: (1) Unless otherwise approved by Company responsible engineer, test shall be conducted at a temperature not lower than 10°C (50°F) during the time at pressure, and the system or unit under test shall be drained then dried with dry air or nitrogen immediately after completion. (2) No residual water pools shall remain after dewatering and drying. (3) Fresh water shall have pH 6.5 to pH 7.5. (4) Maximum allowable water chloride content shall not exceed 50 ppm. Page 43 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Appendix E Reference standards Add The following documents are referenced in one or more requirements in this Specification. For dated references, only the version cited applies. For undated references, the latest version of the referenced document (including amendments) applies. Company EP-GIS 18-011 EP-GIS 36-103 GIS 36-102 RM-GIS 18-011 RM-GIS 18-012 RM-GIS 36-103 Specification for Welded Fabrication and Construction. Specification for Positive Material Identification (PMI). Specification for Hardness Testing and Pickling for Pressure Containing Components. Specification for Welded Fabrication and Construction. Specification for Procurement, Storage, and Control of Welding Consumables. Positive Materials Identification (PMI) for Pressure Vessels, Piping, and other Components. API Specification Add API Specification Q1 Specification for Quality Management System Requirements for Manufacturing Organizations for the Petroleum and Natural Gas Industry. API Recommended Practice Add API RP 582 Welding Guidelines for the Chemical, Oil, and Gas Industries. American Society for Mechanical Engineers (ASME) Add ASME Section IIC ASME Boiler and Pressure Vessel Code (BPVC) - Specifications for Welding Rods, Electrodes and Filler Metals. American Society for Testing and Materials (ASTM) Add ASTM A380 ASTM A923 ASTM E92 ASTM E562 ASTM G48 Standard Practice for Cleaning, Descaling, and Passivation of Stainless Steel Parts, Equipment, and Systems. Standard Test Methods for Detecting Detrimental Intermetallic Phase in Duplex Austenitic/Ferritic Stainless Steels. Standard Test Method for Vickers Hardness and Knoop Hardness of Metallic Materials. Standard Test Methods for Determining Volume Fraction by Systematic Manual Point Count. Standard Test Methods for Pitting and Crevice Corrosion Resistance of Stainless Steels and Related Alloys by Use of Ferric Chloride Solution. Page 44 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) American Welding Society (AWS) Add AWS A5.32 Welding Consumables—Gases and Gas Mixtures for Fusion Welding and Allied Processes. International Organization for Standardization (ISO) Add ISO 14175 ISO 17781 ISO 3183 ISO 5580 ISO 6507-1 ISO 9001 ISO 15156-1 ISO 15156-2 ISO 15156-3 ISO 17945 Welding consumables. Gases and gas mixtures for fusion welding and allied processes. Petroleum, petrochemical and natural gas industries - Test methods for quality control of microstructure of ferritic/austenitic (duplex) stainless steels. Petroleum and natural gas industries - Steel pipe for pipeline transportation systems. Non-destructive testing - Industrial radiographic illuminators Minimum requirements. Metallic materials - Vickers hardness test - Part 1: Test method. Quality management system - Requirements. Petroleum and natural gas industries - Materials for use in H2S containing environments in oil and gas production - Part 1: General principles for selection of cracking-resistant materials. Petroleum and natural gas industries - Materials for use in H2S containing environments in oil and gas production - Part 2: Cracking-resistant carbon and low alloy steels, and the use of cast irons. Petroleum and natural gas industries - Materials for use in H2S containing environments in oil and gas production - Part 3: Cracking-resistant CRAs (corrosion resistant alloys) and other alloys. Petroleum, petrochemical and natural gas industries - Metallic materials resistant to sulfide stress cracking in corrosive petroleum refining environments. [NACE MR0103] Page 45 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Appendix J Nomenclature Add For the purpose of this Specification, the following terms and definitions apply: AC Ar AWS CE CGHAZ CO CO2 CSWIP Cu CuNi CWI DC DN FCAW FL FMC GMAW GTAW HAZ HF HIP HRC H 2S HSE HV HVAC ID IIW IQI ITP ksi LPT MDT Mo MT Nb NDT Ni NiAI Alternating current. Argon. American Welding Society. Carbon equivalent. Coarse grain heat affected zone. Carbon monoxide. Carbon dioxide. Certification scheme for welding inspection personnel. Copper. Copper nickel. Certified Welding Inspector. Direct current. Diameter nominal. Flux cored arc welding. Fusion line. Full matrix capture. Gas metal arc welding. Gas tungsten arc welding. Heat affected zone. Hydrofluoric acid. Hot isostatic pressing. Hardness Rockwell C. Hydrogen sulphide. Health, safety and environmental. Vickers hardness. Heating, ventilation, and air conditioning. Internal diameter. International Institute of Welding. Image quality indicator. Inspection test plan. Kilopound per square inch. Liquid penetrant testing. Minimum design temperature. Molybdenum. Magnetic particle testing. Niobium. Non-destructive testing. Nickel. Nickel aluminide. Page 46 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) NPS OD PAW PAUT PCN pen PMI PN PQR PREN PT PWHT pWPS QC QMS RT Sch SAW SMAW SMYS UNS UT VT WPS Nominal pipe size. Outside diameter. Plasma arc welding. Phased array ultrasonic testing. Personnel certification in non-destructive testing. Penetration. Positive material identification. Pressure Nominal. Procedure qualification record. Pitting resistance equivalent number. Penetrant testing. Post-weld heat treatment. Proposed welding procedure specification. Quality control. Quality management system. Radiographic testing. Schedule. Submerged arc welding. Shielded metal arc welding. Specified minimum yield stress. Unified numbering system. Ultrasonic testing. Visual testing. Welding procedure specification. Page 47 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Appendix Q Quality System program Add The quality management system shall conform to ISO 9001, API Specification Q1, or other internationally recognized standard as approved by Company responsible engineer. Page 48 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Add Appendix AA Requirements for carbon steels, low alloy steels and martensitic stainless steels AA.1 Scope (a) This Appendix lists specific requirements for fabrication of carbon steels, low alloy steels, and martensitic stainless steels. (b) This Appendix shall be read in conjunction with the main body of this Specification. AA.2 Welding AA.2.1 Welding processes GTAW should be used for the root pass and second (hot) pass for materials covered by this Appendix but, as a minimum, shall be used as directed in Table 328.5.1. AA.2.2 Filler metal (a) SMAW electrodes (1) Low hydrogen SMAW consumables shall be used for process pipework. (2) Cellulosic electrodes may be allowed for the root and hot pass if approved by the Company responsible engineer. (b) Consumables designated suffix “G” (e.g., E8018-G or ER70S-G) shall only be used if approved by Company responsible engineer. (c) Consumable manufacturer and trade name of suffix “G” consumables shall be an essential variable. (d) Deposited weld metal (1) Composition shall be suitable for the composition of the parent material. (2) For exploration and production applications, carbon steel carrying injection water in which consumables containing 0,7%Ni to 1,0%Ni shall be used, as a minimum, for the root pass and second (hot) pass. (3) 2 1/4Cr 1Mo 1/4V steels shall use 2 1/4Cr 1Mo consumables to minimize risk of stress relief cracking and provide adequate creep ductility in service. (4) Consumables for repairs to C 1/2Mo steels, shall be of 1-1/4Cr 1/2Mo composition. (5) ERNiCr-3 or ENiCrFe-3 consumables shall be used for 3-1/2Ni steels. AA.2.3 Shielding gases Shielding gases shall conform to 328.3.4. AA.2.4 Purge gas (a) Back purging on materials P1 through P4 shall only be utilized if specified by the engineering design or project specification. (b) Back purging shall be used for P5B, P5C, and greater. (c) Oxygen meters for monitoring purge gas quality for P1 through P5A, P5B, and P5C shall be used if required by the Company responsible engineer. Page 49 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) AA.2.5 Preheat and interpass temperature (a) Minimum metal temperature for welding P1 materials shall be 10°C (50°F). (b) For pipework in severe cyclic conditions or in exploration and production hydrocarbon applications, P1 materials containing greater than or equal to 0.25%C, a minimum preheat temperature of 80°C (175°F) shall be applied, regardless of thickness or tensile strength. (c) For P1 materials in excess of 25 mm (1 in) thickness, a minimum preheat temperature of 93°C (200°F) shall be applied. (d) Preheat temperature for ISO 3183/API 5L materials and AISI steels used for process and utility pipework shall conform to qualified PQR and be subject to approval by Company responsible engineer. (e) Unless approved otherwise by Company responsible engineer, the maximum interpass temperature shall be 250°C (482°F). AA.3 Welding procedure qualification AA.3.1 Essential variables (a) For exploration and production sour service applications, an increase in P1 material CEIIW value of more than 0.02 over that qualified shall require requalification. (b) A new PQR shall be required for a change in consumable brand name of gas shielded rutile flux cored wires used for welds that are subject to PWHT AA.3.2 Charpy V-notch impact testing (a) When impact testing is required by ASME B31.3, the requirements below shall apply. (b) For exploration and production applications, qualification of weldments in P1 materials and low alloy steels, including 3-1/2 Ni, for service at MDT less than or equal to -10°C (14°F) shall include Charpy impact testing. (c) The CVN testing requirements are defined in Tables AA.3.2.1 and AA.3.2.2. Table AA.3.2.1 - Charpy Impact Test Requirements for Carbon Steel MDT CVN Test Temperature CVN Specimen Size Carbon and Low Alloy Steel -29°C (-20°F) ≤ MDT ≤ -10°C (14°F) -29°C (-20°F) 10 x 10 mm Carbon and Low Alloy Steels -46°C (-50°F) ≤ MDT < -29°C (-20°F) -46°C (-50°F) 10 x 10 mm Carbon and low alloy steels MDT < -46°C (-50°F) MDT1 10 x 10 mm 3-1/2 Ni Steels2 Any Per ASME B31.3 10 x 10 mm Material Notes: 1. Unless otherwise advised by Company responsible engineer. 2. The absorbed energy impact requirements for 3-1/2 Ni Steels are 40 J (30 ft-lb) average with a 30 J (22 ft-lb) individual minimum. Page 50 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Table AA.3.2.2 - Charpy Impact Test Acceptance Criteria for Carbon Steel AA.3.3 SMYS (MPa [ksi]) Charpy impact value (J [ft-lb]) average/min value Any 27 J/20 J (20 ft-lb/15 ft-lb) Hardness determination (a) Maximum hardness limit for carbon and low alloy steel weld metal and HAZs in non-sour environments shall be 325Hv10, unless specified otherwise in engineering design or project specification. (b) Maximum hardness limit for carbon and low alloy steel weld metal and HAZs in sour environments shall be 250Hv10. Weld cap hardness up to 275Hv10 max shall be permitted for materials over 9 mm (0.35 in) in thickness. (c) Refining and petrochemical applications shall follow ISO 17945 (NACE MR0103). AA.4 Production welding AA.4.1 Interrupted welding (a) Welds shall be completed without interruption or intermediate cooling to ambient temperature. (b) Welds that cannot be completed without interruption or intermediate cooling may use intermediate cooling under a 25 mm (1 in) thick dry insulating blanket after completion of 30% of final weld depth. (c) Welds in materials of P3, P4, P5A, P5B, P5C, and P6 shall be allowed to cool to the minimum preheat temperature and held at that temperature during any interruption in welding. (d) Weldments in materials of P3, P4, P5A, P5B, P5C, and P6 shall be cooled to ambient temperatures. The intermediate PWHT detailed in AA.5(c) (2) shall be applied. (e) Welds that are unavoidably cooled to ambient temperature before completion shall have MT performed on the weld surface prior to re-application of preheat and continuation of welding. (f) AA.5 Pipes shall not be moved or lifted until at least 50% of final weld depth has been deposited. Post-weld heat treatment (PWHT) (a) Materials less than or equal to 19 mm (0.75 in) thickness shall be subject to PWHT if specified by engineering design or project specification. (b) For pipework in severe cyclic conditions or in exploration and production process hydrocarbon applications, PWHT shall be performed if carbon content of P1 material is greater than or equal to 0,25% unless otherwise approved by Company responsible engineer. (c) Unless otherwise specified by the engineering design or project specification: (1) On completion of welding, materials having a P3, P4, P5A, P5B, P5C, or P6 shall be allowed to slow cool under dry insulation such that welded components are: (a) Maintained at preheat temperature prior to final PWHT. Page 51 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) (b) Held at this temperature for 1 h per 25 mm (1 in) of thickness, with a minimum hold time of 30 min, and then raised to PWHT temperature. (2) Weldments fabricated from materials of P3, P4, P5A, P5B, P5C, or P6 that need to cool to ambient temperature prior to final PWHT, shall have intermediate post-weld heating to control cooling rate as follows: (a) Joints of thickness less than 10 mm (0.4 in): On completion of welding, joint is allowed to cool to ambient temperature under 25 mm (1 in) thick dry insulation. (b) Joints of thickness greater than or equal to 10 mm (0.4 in): (1) On completion of welding, joint is raised to 345°C (653°F) for 1 h per 25 mm (1 in) of thickness, with a minimum hold time of 30 min. (2) Joint is cooled slowly to ambient temperature under 25 mm (1 in) thick dry insulation. (3) Alloys 9Cr-1Mo (ASTM Grade P9) and 9C-1Mo-V-Nb (ASTM Grade P91) shall: (a) Be allowed to slow cool, under dry insulation, to a temperature in the range of 80°C to 100°C (175°F to 212°F). (b) Be held in this temperature range for a minimum of 1 h. (c) Have PWHT applied before weld cools below this temperature range. (d) Furnace temperature shall not exceed 425°C (800°F) while pipe spools are loaded or removed. (e) Maximum heating or cooling rates above 425°C (800°F) (1) Rate of heating shall not exceed 222°C/h (400°F/h) divided by maximum metal thickness in inches and 222°C/hr (400°F/hr) for any thickness. (2) Rate of cooling shall not exceed 280°C/hr (500°F/h) divided by maximum metal thickness in inches and 280°C/h (500°F/h) for any thickness. (f) From 425°C (800°F) piping may be cooled in still air. (g) PWHT shall be performed at temperature range specified in WPS ±15°C (±30°F) from set temperature. (h) For quenched and tempered components, PWHT temperature shall be at least 30°C (50°F) below tempering temperature. AA.6 Bending and forming (a) Following heat treatment of cold pulled bends in low alloy steels, a quality control check by hardness testing shall be performed, at least in the early stages of production. (b) Hardness testing shall be performed on one bend per heat treatment batch at four locations around pipe circumference using portable hardness tester of a type approved by Company responsible engineer. (c) In absence of specific restrictions on hardness, Company guidance shall be sought. Page 52 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Appendix BB Requirements for 300 series austenitic and high alloy austenitic stainless steels, 6%mo alloys, nickel base alloys, and cupro nickel BB.1 Introduction (a) This Appendix lists specific requirements for fabrication of 300 series austenitic and high alloy austenitic stainless steels, 6 Mo alloys, nickel base alloys, and cupro nickel. (b) This Appendix shall be read in conjunction with the main body of this Specification. BB.2 Welding BB.2.1 Welding processes (a) Autogenous welding techniques shall not be used unless approved by Company responsible engineer. (b) SMAW shall be restricted to fill and capping passes in pipe with wall thickness greater than 5 mm (3/16 in) and fillet welds. (c) Alternative gas shielded welding processes may be used for fill and capping passes, subject to provision of documented evidence of previous successful use and subject to approval by Company responsible engineer. (d) Use of SAW shall be subject to approval of Company responsible engineer. (e) SAW fluxes that add alloying elements to weld deposit shall not be used (i.e., only neutral SAW fluxes shall be used) except for small additions of Cr to prevent Cr depletion in weld deposit. BB.2.2 Filler metal (a) Filler metals for 300 series austenitic stainless steels that have a weld metal microstructure containing 3% to 8% ferrite shall be selected, unless otherwise specified by the engineering design or project specification. (b) ERNiCrMo-3 and ENiCrMo-3 fillers shall be used for 6%Mo alloy fabrication welds. BB.2.3 Shielding gas Shielding gases shall conform to 328.3.4. BB.2.4 Backing gas (a) High purity argon shall be used for bore purging. (b) A positive flow of backing gas shall be maintained during tacking and welding for a wall thickness less than or equal to 10 mm (0.4 in). (c) Positive gas flow may be terminated, and the bore may be sealed once the weld throat thickness is greater than 10 mm (0.4 in). (d) If approved by Company responsible engineer, technologies involving GMAW without the use of back purge may be used if successfully qualified. Page 53 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) BB.2.5 Preheat and interpass temperature (a) Preheating is not required for welding the alloys covered by this Appendix but might be required to drive off surface moisture or to raise the minimum metal temperature to 10°C (50°F). (b) A preheat temperature of 50°C (122°F) may be applied to facilitate deposition of the root pass to weld section thickness greater than or equal to 20 mm (0,8 in) (c) Maximum interpass temperature for nickel alloys, cupro nickel alloys, and high alloy austenitic stainless steels (greater than 4% Mo) shall not exceed 200°C (390°F). (d) Maximum interpass temperature for 300 series austenitic SS shall not exceed 150°C (302°F). BB.2.6 Heat input Maximum heat input for 6 Mo shall be within the range of 0.8 kJ/mm to 1.5 kJ/mm (20 kJ/in to 37.5 kJ/in), and 0.5 kJ/mm (12.5 kJ/in) minimum for wall thickness less than 5 mm (0.2 in). BB.3 Welding procedure qualification BB.3.1 Charpy V-notch impact testing (a) Impact testing shall be performed in accordance with ASME B31.3. (b) Required impact testing of the weld metal shall also require impact testing of the HAZ in accordance with 328.2(b). (c) The possibility of toughness degradation exists as a result of PWHT. Charpy V-notch impact testing is required and specified in the engineering design or project specifications when PWHT is performed. Such cases shall be brought to the attention of Company responsible engineer. BB.4 Post-weld heat treatment (PWHT) (a) PWHT shall not be considered standard practice for materials covered by this Appendix. However, austenitic stainless steels may require a reduction in residual stress level by application of a solution anneal heat treatment after complex fabrication or cold bending. (b) Only PWHT that is specified by the engineering design or project specification shall be performed. (c) Stress relief heat treatment of austenitic steels specified in the engineering design or project specification shall be heated to temperature in range of 900°C to 950°C (1,650°F to 1,740°F) and held for 1 h per 25 mm (1 in) of thickness. (d) Furnace heat treatment temperature of austenitic steels shall not exceed 300°C (570°F) while components are loaded. (e) For austenitic stainless steels, maximum heating rate above 300°C (570°F) shall not exceed 200°C (390°F) per h. (f) Following elevated temperature treatment, austenitic pipework shall be removed from the furnace and rapidly cooled (quenched) in air to a procedure approved by Company responsible engineer. Page 54 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) (g) Thermal stabilization heat treatment: (1) Shall be performed after welding of types 321, 347, and 347H stainless steels for applications in high pressure hydrotreating or hydrocracking environments with operating temperature exceeding 371°C (700°F). (2) Shall conform to the following conditions: (a) Heat components to 913°C±14°C (1,675°F±25°F) with a minimum holding time of 2 h. (b) For furnace heat treatment: (1) At the end of the holding time, rapidly cool components from 913°C to 482°C (1,675°F to 900°F) in 1 h or less. (2) Report actual cooling rates to Company. (c) For field heat treatment: (1) Use removable insulation jacket. (2) After completion of required holding time at targeted temperature, remove insulation. (3) Barricade area and place visible warning signs around barricaded area to prevent personnel injury. (h) No galvanized supports, scaffoldings, or other components shall be in contact with stainless steels during heat treatment. (i) BB.5 Weldments in austenitic stainless steel subject to PWHT can suffer degradation of mechanical properties and toughness. Impact testing shall be subject to review and approval by Company responsible engineer. Bending (a) Bending of materials covered by this Appendix shall be done cold. (b) If size and schedule of pipe is such that cold bending impractical, hot bending may be used subject to approval by Company responsible engineer. (c) Cold bending of austenitic stainless steel shall be performed at temperatures less than 425°C (800°F). (d) Cold bends in austenitic stainless steels shall be heat treated for applications in which stress corrosion cracking due to halides (especially chlorides), polythionic acid, caustic, or other environments is likely. (e) Bending requirements for other materials covered by this Appendix shall be subject to approval by Company responsible engineer. (f) BB.6 Factory manufactured piping fittings shall be solution heat treated in temperature range specified by alloy manufacturer. Solution heat treatment shall be followed by water quench. Cleaning, pickling, and passivating of stainless steels (a) Stainless steel items that have become contaminated from heat treatment shall be cleaned by pickling in acid solution followed by passivation. Heat tint from welding can also be removed by same process. (b) Specific equipment or items requiring cleaning will be advised by the project specifications or in the engineering design. Cleaning treatment shall be proposed and subject to approval by Company responsible engineer. Page 55 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Appendix CC Requirements for 22 Cr duplex and 25 Cr super duplex stainless steel materials CC.1 Introduction (a) This Appendix lists specific requirements for the fabrication of duplex stainless steels. (b) This Appendix shall be read in conjunction with main body of this Specification. CC.2 Welding CC.2.1 Welding processes (a) GTAW shall be used for root pass and second (hot) pass. (b) Autogenous welding techniques shall not be used unless qualified by PQR in a welded joint that has undergone solution heat treatment and water quenching. (c) SMAW shall be restricted to fill and capping passes in pipe with wall thickness greater than 5 mm (3/16 in). (d) Alternative gas shielded welding processes, such as GMAW or FCAW, may be used for the fill and capping passes, subject to approval by Company responsible engineer. (e) The use of SAW shall be subject to approval by Company responsible engineer. (f) Duplex stainless steels can be susceptible to delayed hydrogen cracking. Steps shall be taken to minimize hydrogen potential of welding technique, including: (1) Drying and storage of SMAW consumables conforming to electrode manufacturer’s recommendations. (2) Use of low temperature preheat, if necessary, to remove moisture. CC.2.2 Filler metal (a) Filler metal compositions of 22 Cr/9 Ni/3 Mo.L or 25 Cr/10 Ni/4 Mo.L type or other proprietary compositions specifically manufactured for duplex steels shall be selected for welding. (b) ENiCrMo-3 and ERNiCrMo-3 filler metals shall not be used for welding. (c) Consumable selection shall result in: (1) A weld ferrite level of 35% to 70% in the welded condition. (2) A weld ferrite level of 35% to 60% in the solution annealed condition. (3) A minimum PREW value of 35 for 22 Cr duplex and 40 for 25 Cr super duplex. PREw = %Cr + 3,3(Mo% + 0,5W%) + 16%N (c) Welds between duplex stainless steel and C-Mn or low alloy steels shall use Nb free nickel based consumables (e.g., E/ERNiCrMo-10, E/ERNiCrMo-13 or E/ERNiCrMo-14). CC.2.3 Shielding gas (a) Shielding gases shall: (1) Be argon based. Page 56 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) (2) Conform to 328.3.4. (b) Unless approved by Company responsible engineer, shielding gases shall not contain hydrogen. CC.2.4 Backing gas (a) Positive flow of backing gas shall be maintained during tacking and welding, including capping passes if pipe wall thickness is less than 10 mm (3/8 in). (b) Positive flow may be terminated, and the bore sealed once weld throat thickness is greater than 10 mm (3/8 in). (c) High purity argon shall be used for back purge. (d) Nitrogen or argon/nitrogen mixtures may be used for duplex alloys. (e) Hydrogen containing backing gases shall not be used. (f) Maximum oxygen content of the purge gas shall not exceed 0.05% (500 ppm). (g) Oxygen content of backing gas shall be monitored by a calibrated oxygen meter. CC.2.5 Joint geometry (a) Weld root gaps less than 2 mm (5/64 in) shall not be allowed, unless fabricator can demonstrate that its production method does not adversely affect microstructural balance of root bead. (b) Achievement of qualified root gap shall be confirmed during production welding. (c) J-prep joint shall be qualified using PQR representative of the joint configuration. CC.2.6 Heat input (a) Arc energy during production welding shall not exceed 2.5 kJ/mm (62.5 kJ/in) for 22 Cr duplex stainless steels, and 0.5 kJ/mm (12.5 kJ/in) minimum for wall thickness less than 5 mm (0.2 in). (b) For 25 Cr super duplex stainless steels, the upper limit shall be 1.5 kJ/mm (37.5 kJ/in) and limited to the range qualified during the PQR. (c) For small diameter thin wall tubing applications, lower heat inputs may be considered if they are successfully qualified during weld procedure qualification. CC.2.7 Preheat and interpass temperature (a) Preheating shall not be required if welding the alloys covered by this Appendix, except if needed to remove surface moisture or to raise the minimum metal temperature to 10°C (50°F). (b) For welding section thickness greater than or equal to 20 mm (0.80 in), a preheat temperature of 50°C (122°F) may be applied to enable deposition of the root pass. (c) Maximum interpass temperature shall be: (1) 175°C (350°F) for 22 Cr duplex stainless steels. (2) 150°C (300°F) for 25 Cr super duplex stainless steels and weld metals. Page 57 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) CC.3 Welding procedure qualification CC.3.1 P-numbers (a) Each duplex alloy (UNS number) shall be qualified separately. Upon approval by Company responsible engineer, a weld may be fabricated consisting of two different duplex alloys (UNS numbers). If both materials undergo required mechanical testing, the resulting WPS would be allowed to weld the duplex alloys to each other and to themselves. (b) Materials manufactured by HIP shall be qualified separately. CC.3.2 Positional welding Unless otherwise approved by Company responsible engineer, weld procedure qualification for positional welding shall require test pieces welded in both the 2G position and 5G position. CC.3.3 Metallurgical qualification (a) Metallurgical qualification shall be required for each welding PQR. (b) Butt welds and fillet welds shall be qualified separately. (c) Sections for hardness and microstructural qualification shall be taken from 3 o’clock position and 6 o’clock position of 5G test piece. (d) A transverse section taken across weldment shall be prepared for metallographic examination at 400x or higher magnification. (e) Etchant used shall enable ferrite, austenite, and intermetallic phase present to be identified. (f) Suitable etchants are: (1) For determining austenite/ferrite balance - Electrolytic etchant, consisting of 40% KOH or 40% NaOH. (2) For examination to determine intermetallic phases - Electrolytic Etchant, KOH (ASTM E407 Etchant 97) is preferred. However, Etchant 98 (ASTM E407), consisting of K3Fe(CN)6 in KOH can also be effective. A 40% NaOH solution per ASTM A923 electrolytic can be effective. In each case, photographic evidence shall be provided to demonstrate that the chosen etching procedure is valid for detecting low levels of intermetallics. (3) Upon evidence of intergranular nitrides, alternative etchants may be considered that might be better suited for highlighting this phase. For example, oxalic acid (ASTM E407 Etchant 13). (g) Ferrite austenitic phase balance shall be determined by a systematic point counting procedure as detailed in ASTM E562. (h) Phase balance shall be measured, as a minimum, in HAZ and weld metal at root and cap positions 2 mm (0.08 in) below surface. (i) Ferrite levels (1) Ferrite levels for HAZ and weld areas shall be between 35% and 70% in “as welded” condition and 35% to 60% in the solution annealed condition. (2) If duplex filler metals are used to weld austenitic stainless steels, lower ferrite numbers are acceptable. However, the resulting weld metal shall be free from intermetallic phases. Page 58 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) (j) Intermetallic phases, carbides, and nitrides (1) Microstructure shall be examined in accordance with ASTM A923 Method A. (2) Microstructure shall be classified as an unaffected structure. (3) Alternatively, ISO 17781 may be used to assess the metallographic and microstructural properties of duplex weldments. (k) Grain boundaries shall show no continuous precipitation. (l) CC.3.4 Microstructures observed during the examinations shall be recorded on photo-micrographs and included in the PQR documentation. Charpy V-notch impact testing (a) Duplex stainless steel piping materials, fittings, components and weldments shall be impact tested. (b) Impact tests shall be performed at -46°C (-50°F) taken to be MDT. (c) Acceptance criteria for energy absorbed shall be 45 J (33 ft-lb) minimum average, 35 J (26 ft-lb) minimum individual. CC.3.5 Hardness determination (a) Hardness measurements in conformance to 328.2(i) shall be performed on samples prepared for metallographic qualification in CC.3.3. (b) Maximum weld metal and HAZ hardness shall not exceed 334 HV10 for 22 Cr duplex and 378 HV10 for 25 Cr duplex in as welded condition. CC.3.6 Essential variables The following additional essential variables shall apply to duplex stainless steels: (a) Tolerance of minus 0, plus 2 mm (5/64 in) shall apply to qualified procedure root gap. (b) Unless otherwise approved by Company responsible engineer, each pipe wall thickness less than or equal to 5 mm (3/16 in) shall be qualified separately. (c) For thicknesses greater than 5 mm (3/16 in), qualified thickness range in Table CC3.6 shall apply to each thickness (t) tested: Table CC3.6 - Qualified thickness range Material Qualified Material Range 22%Cr 0.5t (but not less than 5 mm [3/16 in]) to t+6 mm (1/4 in) (subject to a maximum thickness of 25 mm [1 in]). 1.0t. to t + 6 mm (1/4 in). 22%Cr > 25 mm (1 in) and 25%Cr (d) No change shall be made in type of groove or in basic groove design from that used in PQR. Welding in pipe bore shall require a specific double-sided WPS with PQR. (e) SMAW electrode size used for PQR may be reduced by no more than one size. Increase in maximum size of electrode shall not be allowed. (f) Heat input range. (g) Filler material brand name. (h) Purging and backing gas oxygen content and monitoring method. Page 59 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) (i) CC.3.7 Material grade and UNS number. Corrosion testing (a) PQR shall include corrosion testing in conformance to ASTM G48 Method A. (b) Corrosion testing to ASTM A923 Method C or ISO 17781 may be used if approved by Company responsible engineer. (c) Corrosion testing is not required for fillet weld qualifications. (d) Test specimens shall be pickled before being weighed and tested. (e) Pickling may be performed in an acid solution following the guidance of ASTM A380. An example for such a procedure is for 5 min at 60°C in a solution of 20% HNO3 + 5% HF (volume fraction). Samples tested in the as welded condition are also acceptable. (f) Sharp edges shall be broken to approximately 1 mm (0.04 in) radius. (g) Specimens shall be degreased prior to immersion in the test solution. (h) Duration of the corrosion tests shall be 24 h. (i) Test temperature shall be 22°C (72°F) for 22 Cr duplex and 35°C (95°F) for 25 Cr super duplex materials respectively. (j) Acceptance criteria shall be no visible pitting at a magnification of x20. (j) Weight loss shall not exceed 4.0 g/m2/day (40 mg/dm2/day). (k) If the test results do not meet the acceptance criteria, then a new specimen may be taken and retested. (l) CC.4 Company shall be notified before proceeding with retesting. Welder qualification (a) Qualification of 25 Cr super duplex consumable and parent metal shall also qualify 22 Cr duplex welded with 25 Cr super duplex consumables. (b) Qualification of 22 Cr duplex consumable and parent metal shall not qualify 25 Cr super duplex parent metal. (c) Unless approved otherwise by Company responsible engineer, both 2G qualification and 5G qualification shall be qualified at maximum root gap. (d) Welder qualification for both 22 Cr and 25 Cr shall include corrosion testing as detailed in CC.3.7. (e) Welders shall not be qualified on initial production welds. (f) Welders and welding operators who either do not possess an authenticated performance record or will be working with 25 Cr super duplex materials shall be qualified by VT, and RT in addition to mechanical testing. CC.5 Production welding CC.5.1 General (a) Bridge tacking shall be used for butt welds. (b) Each temporary attachment shall be subject to approval by Company responsible engineer. Page 60 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) (c) Welding parameters, including arc voltage, current, and travel speed shall be monitored on a basis subject to approval by Company responsible engineer to ensure that arc energy restrictions of CC.2.6 are being observed. CC.5.2 Repair welding (a) Procedures shall be qualified for both deep penetration and shallow repairs. (b) Extent of testing shall be subject to approval by Company responsible engineer. (c) No local through wall repairs shall be allowed. Joints that contain defects located within 5 mm (0.2 in) of internal pipe bore shall be cut out and re-welded. (d) Repair welding of tubing shall not be permitted. (e) Only one repair cycle shall be allowed. CC.6 Bending (a) Unless approved otherwise by Company responsible engineer: (1) Cold bending shall be such that maximum strain does not exceed 15%, as calculated by following equation: Maximum Strain D / 2 r Where: D is outside diameter of tube r is bend radius. (2) Hardness shall not exceed 334 HV10 (28 HRC) for 22 Cr duplex and 378 HV10 (32 HRC) for 25 Cr duplex stainless steel. (b) Factory manufactured piping fittings shall: (1) Conform to Company requirements included in Purchase Order. (2) Be solution heat treated in temperature range specified by alloy manufacturer. (3) Be water quenched following solution heat treatment. (c) Cold worked duplex stainless steels shall be solution heat treated and water quenched. (d) Heat treatment procedures for duplex stainless steels shall be subject to qualification testing to demonstrate that acceptable microstructures, mechanical properties, and corrosion resistance will be achieved. Page 61 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Appendix DD Requirements for titanium and zirconium DD.1 Introduction (a) This Appendix lists specific requirements for fabrication of titanium and zirconium. (b) This Appendix shall be read in conjunction with the main body of this Specification. DD.2 Cleaning and preparation for welding (a) Weld preparation shall be performed by machining, sawing, or manually using metal burr, followed by draw filing or wire brushing with stainless steel or titanium brush. (b) Thermal cutting techniques shall not be used. (c) Working practices shall be designed to minimise contamination. (d) Before welding, internal and external surfaces shall be cleaned for at least 75 mm (3 in) from fusion face. (e) Surfaces to be joined by welding shall be stainless steel or titanium wire brushed and degreased immediately prior to welding. (f) Degreasing agent shall leave no chloride or sulphide containing residues on surface. (g) Methanol shall not be used for degreasing titanium and zirconium. (h) Subject to approval by Company responsible engineer, small pipes that are impossible to wire brush internal surfaces shall be chemically cleaned using an agent. (i) New files and stainless steel or titanium brushes strictly reserved for use on only titanium or zirconium shall be used. DD.3 Welding DD.3.1 Welding process (a) Welding shall be performed by gas shielded welding process. (b) GTAW or PAW shall be used. DD.3.2 Filler metals (a) Filler metals shall: (1) Have same nominal composition as base material. (2) Conform to ASME IIC SFA 5.16/SFA A5.16M (titanium) and SFA 5.24/SFA 5.24M (zirconium). (b) Filler wires shall be cleaned and degreased. (c) Degreasing agent for filler wires shall: (1) Leave no chloride and sulphide residues on surface. (2) Not be methanol for degreasing titanium and zirconium. (d) After cleaning, wires shall be handled with clean gloves issued for either titanium or zirconium fabrication. Page 62 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) (e) End of filler wire shall be kept within gas shield at all times during welding by restricting weaving of welding wire to a minimum. (f) DD.3.3 Prior to each weld pass, end of filler wire shall be cut to expose clean wire using chromium plated or stainless steel wire cutters. Shielding gases (a) Shielding gases shall be only high purity (99.998%) argon, helium, or argon helium mixtures. (b) Welding torch nozzle size and the associated gas lens shall be selected to permit adequate primary shielding. (c) Trailing secondary shield shall be used to protect the weld and HAZs while they are cooling to temperatures less than 180°C (350°F) or the temperature demonstrated in (d). (d) Temperatures may be greater than 180°C (350°F) if weld procedure qualification demonstrates that a temperature greater than 180°C (350°F) does not result in discoloration considered unacceptable in Table DD.6.2C. (e) Dew point of shielding gas shall be: (1) Less than -50°C (-58°F). (2) Measured at torch prior to welding and at cylinder change. (3) Measured at the beginning of each shift for bulk supply systems. (f) DD.3.4 An alternative, but a less preferable option to dew point measurement, is a test weld that conforms to silver colouration requirements of DD.6.2 produced at intervals specified in DD.3.3(e). This approach, if proposed, shall be subject to approval by Company responsible engineer. Backing gas (a) Positive flow of high purity (99.998%) argon backing gas shall be maintained throughout welding operation and during cooling to 180°C (350°F). (b) System shall be purged prior to commencement of welding. (c) Dew point of backing gas shall be assessed in conformance to same requirements stated for shield gas. See DD.3.3(e). DD.3.5 Preheat and interpass temperature (a) Minimum temperature for welding shall be 10°C (50°F). (b) Interpass temperatures shall be: (1) Restricted to 100°C (212°F). (2) Measured by contact thermometer. DD.3.6 Interpass cleaning (a) No interpass cleaning shall be performed until colour test detailed in DD.6.2 has been completed. (b) Craters shall be ground using metal burr. (c) Each pass shall be cleaned with stainless steel or titanium wire brush. Page 63 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) DD.4 Welding procedure qualification DD.4.1 Charpy V-notch impact testing (a) Impact testing shall be required on titanium for MDT less than -10°C (14°F). (b) Acceptance criteria shall be 35 J (26 ft-lb) minimum average, 25 J (19 ft-lb) minimum individual value. DD.4.2 Hardness determination (a) Titanium (1) Hardness measurements shall be performed on PQR weldment. (2) Hardness traverses shall sample all regions of the weldment. (3) Acceptance limit shall be 200 HV5 (200 Brinell). (b) Zirconium (1) Hardness testing shall be performed for piping welds. (2) Tests shall be made using a ball type indenter. (3) The gradient between weld and parent material hardness (including HAZ) shall not exceed 30 BHN points. DD.5 Welder qualification (a) Unless approved otherwise by Company responsible engineer, welders or welding operators shall be re-qualified prior to start of production welding. (b) Welders and welding operators who either do not possess an authenticated performance record or will be working with titanium or zirconium shall be qualified by VT and RT in addition to mechanical testing. (c) Welders and welding operators shall weld agreed quality control test piece at frequency specified by Company responsible engineer. (d) Bend test coupons shall be taken from test piece. (e) Bend tests shall pass transverse root bend and face bend tests (bend radius 5T) that conform to procedure qualification acceptance criteria. DD.6 Production welding DD.6.1 General (a) Unless otherwise approved by Company responsible engineer, line-up clamps shall be used. (b) Use of bridge tacks shall be subject to approval by Company responsible engineer. (c) Temporary welded attachments shall not be allowed. DD.6.2 Weld bead discolouration (a) Each weld bead, including every pass in multipass weldments, shall be examined for discolouration. (b) Colours shall be judged against Table DD.6.2C, and additional actions shall apply as stated. Page 64 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) (c) Quality plan shall clearly define procedure and individual responsibilities associated with this examination. Table DD.6.2C - Weld bead discolouration Weld colour Significance Shielding Silver Generally, a good weld Good Pale straw Acceptable weld Fair Light blue or purple Unacceptable Poor Grey or yellow powder Unacceptable Extremely poor Action Clean with stainless steel or titanium wire brush. Proceed to NDT or next weld pass. Remove discolouration with stainless steel or titanium brush before next pass. Remove weld bead and adjacent metal completely. Improve shielding before re-welding. Remove weld bead and heat affected zone completely. Examine shielding equipment for leaks, gas supply, etc. Make test welds before re-welding. Page 65 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Appendix EE Requirements for automated gas tungsten arc welding (GTAW) EE.1 Introduction (a) This Appendix details requirements for automated GTAW. (b) This Appendix shall be read in conjunction with the main body of this Specification and Appendix AA through Appendix DD, as appropriate. (c) This Appendix is applicable to both autogenous welding techniques and those employing the addition of filler wire. (d) Qualification requirements of this Specification and Appendix AA through Appendix DD shall be followed if qualifying any automated autogenous welding or wire fed procedure. EE.2 Welding equipment Welding equipment (e.g., orbital welding head, power source, control module, and programming unit) used for PQR and production welding shall be the same equipment manufacturer. EE.3 Welding consumables EE.3.1 Tungsten electrodes (a) Only tungsten electrodes with tip geometry qualified by the PQR shall be used. (b) Manual grinding of tungsten electrodes shall not be allowed. (c) If recycled, tungsten electrodes shall be reground using specialized, mechanized grinding equipment. EE.3.2 Penetration enhancing flux (a) Use of penetration enhancing flux shall be subject to approval by Company responsible engineer. (b) Penetration enhancing flux shall be of the same brand and trade name as used for the PQR. EE.4 Tube end preparation (a) Tube cutting (1) Tube cutting shall be performed with specialized tube cutters that generate minimal cutting debris. (2) Cutting procedures shall allow for the removal of cutting debris from the tube bore. (3) The use of alternative cutting methods, such as band saws and hacksaws, shall be subject to approval of procedures that delineate methods to minimize and remove contaminates. (b) Tube facing (1) Tube end preparation shall be accomplished with specialized tube facing equipment. Page 66 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) (2) Facing procedures shall allow for the removal of cutting debris from the tube bore. (c) Manual de-burring may be used. (d) Tube ends shall be thoroughly cleaned and degreased prior to fit-up and welding. EE.5 Welding procedure qualification (a) Previously qualified WPS may be submitted for consideration by Company responsible engineer in conformance to 327.1.1(d). (b) Essential variables for PQR shall include the relevant parameters detailed in this Specification and following: (1) Welding head and power supply. (2) Tube diameter. (3) Tube wall thickness. (4) Diameter of filler wire. (5) Activating flux - brand name, flux manufacturer, and method or procedure for application. (6) Arc current and for pulsed welding, as follows: (a) Peak and background current values ±10%. (b) Peak and background current times ±10%. (7) Arc voltage ±10%. (8) Travel speed and times associated with travel speed pulsing ±10%. (9) Wire feed speed and times associated with wire feed speed pulsing ±10%. (10) Tube position and orientation of weld joint, (i.e., tube axis horizontal with weld joint vertical, or other). (c) Method of forced cooling, if applied to PQR weld, shall be specified in the WPS (see 330.1.5). EE.6 Welder performance qualification (a) Welding operators may be qualified on production welds subject to approval by Company responsible engineer. (b) Qualification testing. (1) Qualification testing for autogenous welding shall consist of a series of at least two consecutive test welds executed using the qualified WPS applicable to production welding. (2) Each weld shall conform to NDT requirements of this Appendix. EE.7 Non-destructive testing (a) NDT shall conform to 341 through 345, inclusive of this Specification and additional requirements in EE.8. (b) For small bore tubing, RT shall conform to 344.5, but with: (1) Double wall technique. (2) Procedure based on three exposures shot perpendicular to weld. Page 67 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) (3) No elliptical exposures. EE.8 Non-destructive testing acceptance criteria for small bore tubing Acceptance criteria for weld defects shall conform to ASME B31.3 Table 341.3.2 “severe cyclic conditions”. EE.9 Weld repairs (a) Weld repairs shall not be performed on autogenous or single pass welds. Defective welds shall be cut out and replaced. (b) Weld repairs on wire fed welds shall be specifically qualified for the following conditions: (1) Cap repairs. (2) Mid thickness repairs, up to 50% of the wall thickness. (c) Root weld repairs shall not be permitted. (d) Defective root welds shall be cut out and replaced. Page 68 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) Bibliography BP EP-GIS 14-018, Specification for HVAC Piping. EP-GIS 18-013, Specification for Weld Overlay, Integral Cladding and Limited Loose Lining of Pressure Vessels and Other Components. GIS 18-015, Specification for Weld Deposited Overlay of Subsea Production (API 17D-API-6A) Equipment, Line Pipe, Fittings, and Valve Bodies. GIS 36-250, Specification for Materials for Sour Service in Oil and Gas Exploration and Production. EP-GIS 36-300, Material Specification for Impact Tested Carbon Steel. EP-GIS 36-310, Material Specification for 316-316L and 6Mo Austenitic Stainless Steel. EP-GIS 36-320, Material Specification for 22%Cr and 25%Cr Duplex Stainless Steel. EP-GIS 36-330, Material Specification for (90-10) Copper-Nickel and NiAl Bronze. EP-GIS 36-350, Material Specification for Nickel Alloy 625. EP-GIS 36-360, Material Specification for Titanium Grade 2. GIS 18-331, Specification for Pipeline Welding (API 1104). GIS 18-332, Specification for Pipeline Welding (ISO 13847). GIS 18-333, Specification for Pipeline Welding (BS 4515). GIS 18-334, Specification for Welding of Corrosion Resistant Alloy, Internally Clad, and Mechanically Lined Pipelines. GP 06-60, Painting of Metal Surfaces. GP 06-29, Corrosion Protection During Hydrotesting, Wet Lay Up, Flushing and Commissioning Activities. GP 32-40, In Service Pressure Testing - Common Requirements. GP 36-10, Metallic Materials Selection for Refineries and Petrochemical Facilities. GP 36-15, Materials Selection for Surface Equipment (Onshore and Offshore Topsides) in Oil and Gas Production Facilities. GP 36-20, Materials Selection for Subsea Equipment. GP 36-25, Materials for Sour Service in Exploration and Production (ISO 15156 or NACE MR0175). GP 36-26, Materials for Sour Service in Petroleum Refining Environments. GP 42-31, Flanged Joint Assembly. RM-GIS 18-013, Specification for Weld Overlay, Integral Cladding and Limited Loose Lining of Pressure Vessels and Other Components. S&OR R&M High Value Learning Alert #11 Dissimilar metal weld failures. Page 69 of 70 19 September 2020 GIS 42-103 Specification for Fabrication, Assembly, Erection, and Inspection of Pipework (ASME B31.3) American Petroleum Institute (API) API RP 2009, Safe Welding, Cutting, and Hot Work Practices in the Petroleum and Petrochemical Industries. API TR 938-C, Use of Duplex Stainless Steels in the Oil Refining Industry. American Society of Mechanical Engineers (ASME) ASME B31.1, Power Piping. ASME B31.9, Building Services Piping. ASME B31P, Standard Heat Treatments for Fabrication Processes. ASME Section VIII Division 1, Rules for Construction of Pressure Vessels. American Society for Testing and Materials (ASTM) ASTM B600, Standard Guide for Descaling and Cleaning Titanium and Titanium Alloy Surfaces. ASTM B614, Standard Practice for Descaling and Cleaning Zirconium and Zirconium Alloy Surfaces. ASTM E407, Standard Practice for Microetching Metals and Alloys. American Welding Society (AWS) AWS D1.1/D1.1M, Structural Welding Code - Steel. AWS D10.6/10.6M, Recommended Practices for Gas Tungsten Arc Welding of Titanium Pipe and Tubing. AWS D10.18/D10.18M, Guide for Welding Ferritic/Austenitic Duplex Stainless Steel Piping and Tubing. AWS D18.2, Guide to Weld Discoloration Levels on Inside of Austenitic Stainless Steel Tube. AWS Z49.1, Safety in Welding, Cutting, and Allied Processes. British Standards Institution (BSI) BS 5383, Material identification of steel, nickel alloy and titanium alloy tubes by continuous character marking and colour coding of steel tubes. EN Standards (EN) EN 1011-1, Welding - Recommendations for welding of metallic materials - Part 1: General guidance for arc welding. EN 14161, Petroleum and natural gas industries - Pipeline transportation systems. EN 14717, Welding and allied processes. Environmental checklist. Health and Safety Executive (HSE) Work with ionising radiation: Ionising Radiations Regulations 1999 Approved code of practice and guidance. Pipe Fabrication Institute (PFI) PFI ES-22, Recommended Practice for Colour Coding of Piping Materials. PFI ES-41, Standard for Material Control and Traceability of Piping Components. TWI Ltd. (TWI) Welding Titanium - A Designers and Users Handbook. Page 70 of 70 19 September 2020
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )