Challenges in Construction
Scheduling
Levente Mályusz PhD
Department of Construction Technology and Management
1
Traditional Scheduling Networks
• Engineering
• Critical Path Method (Activity on Arrow)
• Metra potential Method (Activity on Node)
• Precedence Diagramming Method (Activity on Node)
• Stohastic Methods, (Monte Carlo Simulation)
• Mathematical Background
• Directed Graph: Shortest Path (Longest Path algorithms)
• Least Cost Scheduling
• Network Flows, Operation Research
Department of Construction Technology and Management
2
Activities
Traditional Activities
• Linear
• Continuous
• Strechable
• Hammock
• Milestone
Nontraditional
• Nonlinear
• Splittable
Department of Construction Technology and Management
3
2020.11.03.
Relationships
• Traditional relationships
• Minimum FSz, SSz ,FFz, SFz
• Boolean AND
• NonTraditional
• Maximum, FSz, SSz, FFz, SFz
• Nonlinear
• Point to Point
• Boolean OR
Department of Construction Technology and Management
4
Challenges
• Model relibility: network sctructure with prerequisites, data
• Reliabiltiy of activity duration estimation, logical relationships
• It is long time to build a network for scheduling
Department of Construction Technology and Management
5
Shortcomings
• Limited relationships
• Quantity, quality
• Given order of activities
• Lack of automation
• Lack of least cost scheduling
Department of Construction Technology and Management
6
2020.11.03.
New expectations, order of activities
• Exercises - Basics of Scheduling
• http://www.ekt.bme.hu/CM-BSC-MSC/CM-BSC-MSC.htm
Department of Construction Technology and Management
7
New Developments at our Department
Construction Automation Reseacrh Group
• New relationships, continuous relationships, Boolean relationships
(AND, OR)
• Nonlinear activities, stretchable activities
• Connection to Project Management Softwares (Microsoft Project,
Primavera, Synchro) and CAD softwares
Department of Construction Technology and Management
8
AND / OR relationships
OR relationship one of them should be fullfilled
AND relationship (this is the normal realtionship)
each should be fullfilled
A
B
C
D
A
B
OR
C
Department of Construction Technology and Management
9
OR
OR
D
2020.11.03.
Point to Point Relationship
Learning effect: accelerated activity;
Minimum distance should be 1 day
Minimum distance 1 day
Different quantities per meter: decelerated activity;
Minimum distance should be 1 day
Department of Construction Technology and Management
10
Bidirectional Relationships (FSz, SSz, FFz,SFz)
road1
A
B
C
D
road2
FS0
FS0
FS0
FS0
road1
A
A
B
B
C
C
D
D
road2
FS0
FS0
FS0
FS0
road1
A
A
B
B
OR
C
C
D
D
road2
FS0
FS0
FS0
FS0
road1
A
A
B
B
OR
C
C
D
D
road2
FS0
FS0
FS0
FS0
2*2*2*2 =16 networks
Department of Construction Technology and Management
11
Permutation Relationships (FSz, SSz, FFz,SFz)
road2
road1
road3
Permutation
A
B
C
D
FS0
FS0
FS0
FS0
A
B
C
FS0
FS0
FS0
A
3!*3!*3!*3! = 1296 networks
B
C
FS0
D
D
Department of Construction Technology and Management
12
A
B
OR
C
D
2020.11.03.
Change constrution order
Department of Construction Technology and Management
13
Project monitoring and control
• Manual/Automatic monitoring and control
• Cameras, drones, crane heat map!?...
Department of Construction Technology and Management
14