Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 TABLE OF CONTENTS EXECUTIVE SUMMARY ........................................................................................................................II 1 2 INTRODUCTION ............................................................................................................................. 1 1.1 Background .............................................................................................................................. 1 1.2 Contract Data and Management ..............................................................................................2 1.3 Scope of Services and Objectives ........................................................................................... 2 1.4 Project Description ................................................................................................................... 3 REVIEW OF PREVIOUS STUDIES ................................................................................................6 2.1 Route Assessement ................................................................................................................. 6 2.1.1 3 TOPOGRAPHICAL SURVEY .......................................................................................................16 3.1 Introduction .............................................................................................................................16 3.2 Mobilization of Surveyors and Equipment’s .......................................................................... 16 3.3 Data Collection ....................................................................................................................... 17 3.4 Scope of Topographic Survey ............................................................................................... 17 3.5 GPS Surveying Methodology .................................................................................................18 3.5.1 Establishment of Geodetic Control Points Using Global Positioning System (GPS) .... 18 3.5.2 Tying with National Coordinate System ......................................................................... 18 3.5.3 Coordinate System ......................................................................................................... 18 3.5.4 Verification of Positioning ............................................................................................... 18 3.5.5 Data Processing and Mapping ....................................................................................... 18 3.6 4 Route Identification ........................................................................................................... 6 Benchmark Setup ...................................................................................................................19 3.6.1 Control Traverse-Line ..................................................................................................... 19 3.6.2 Geometric Level-Line ......................................................................................................20 3.7 Collection of Cross-section Data ........................................................................................... 20 3.8 Data Processing and CADD .................................................................................................. 21 HYDROLOGICAL AND HYDRAULIC STUDY ............................................................................ 22 4.1 Project Description ................................................................................................................. 22 4.2 Methodology and Standards .................................................................................................. 23 4.2.1 General ........................................................................................................................... 23 4.2.2 Methodology ................................................................................................................... 23 4.2.3 Design Standards /Frequency ........................................................................................ 24 4.2.4 Methods of Design Flood Computation ..........................................................................25 4.3 Data Collection and Analysis ................................................................................................. 26 4.3.1 4.4 Data Collection ................................................................................................................27 Previous Studies, Existing Data and Maps ........................................................................... 27 Engineering Works Consultant PLC. i Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 4.4.1 Data and documents .......................................................................................................27 4.4.2 Existing Conditions ......................................................................................................... 28 4.4.3 Hydro-Climatic Data ........................................................................................................29 4.4.4 Climate ............................................................................................................................ 29 4.4.5 Rainfall Data ................................................................................................................... 30 4.4.6 Frequency Analysis ........................................................................................................ 31 4.4.7 Catchment area Delineation ........................................................................................... 32 4.4.8 Hydrologic Soil Type .......................................................................................................33 4.4.9 Vegetation and Land Use ............................................................................................... 34 4.5 Hydrological Study ................................................................................................................. 35 4.5.1 General ........................................................................................................................... 35 4.5.2 Methods of Peak Flood Computations ........................................................................... 36 4.5.3 Rational Method ..............................................................................................................36 4.5.4 SCS Unit Hydrograph Method ........................................................................................ 40 4.6 Hydraulic Design .................................................................................................................... 47 4.6.1 General ........................................................................................................................... 47 4.6.2 Hydraulic Design Standard .............................................................................................47 4.6.3 Manning’s Formula of Hydraulic Analysis ...................................................................... 48 4.6.4 Culvert and Auxiliary Facility Hydraulic Design ..............................................................48 4.6.5 Pipe Culverts ...................................................................................................................49 4.6.6 Slab/box Culverts ............................................................................................................50 4.6.7 Design of Major Cross Drainage Structures ...................................................................52 4.6.8 Design of Longitudinal Drainage Facility ........................................................................54 4.6.9 Bridge Scouring .............................................................................................................. 56 4.6.10 Back water effect (Afflux) ................................................................................................57 4.7 5 Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Conclusions and recommendations ...................................................................................... 58 GEOMETRIC DESIGN ..................................................................................................................59 5.1 Introduction .............................................................................................................................59 5.2 Design Control and Criteria ....................................................................................................62 5.2.1 Functional Classification .................................................................................................62 5.2.2 Geometric Classification ................................................................................................. 63 5.2.3 Traffic Volume and Characteristics ................................................................................ 64 5.2.4 Terrain Classification ...................................................................................................... 71 5.2.5 Type of area Classification ............................................................................................. 73 5.2.6 ERA Design Standards ...................................................................................................73 5.2.7 Selection of Design Standard Parameters and Their Limiting Values ...........................77 Engineering Works Consultant PLC. ii Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 5.3 7 Geometrical Design of the Project Road ............................................................................... 80 5.3.1 General ........................................................................................................................... 80 5.3.2 Analysis Horizontal Alignment Design ........................................................................... 80 5.3.3 Vertical Alignment ...........................................................................................................86 5.3.4 Draft Engineering Design Drawings ............................................................................... 93 5.4 6 Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Requested Departures from Standard ...................................................................................93 5.4.1 General ........................................................................................................................... 93 5.4.2 List of Requested Departures from Standard ................................................................ 95 5.4.3 Reasons and Justifications for the Requested Departures from Standard ................... 99 5.4.4 Mitigation Measures ......................................................................................................103 5.4.5 Conclusion and Recommendations ..............................................................................104 ROAD SAFETY DESIGN ............................................................................................................105 6.1 Review of Existing Accident Data ........................................................................................ 105 6.2 Road Safety ..........................................................................................................................110 6.3 Road side Furniture and Road Markings .............................................................................111 PAVEMENT DESIGN ..................................................................................................................114 7.1 Introduction ...........................................................................................................................114 7.2 Design Standards and Departure ........................................................................................ 114 7.2.1 Design Standards ......................................................................................................... 114 7.2.2 Design Period ............................................................................................................... 114 7.3 Existing Pavement Condition Survey .................................................................................. 115 7.4 Traffic Volume ...................................................................................................................... 115 7.4.1 General ......................................................................................................................... 115 7.4.2 Traffic Survey ................................................................................................................115 7.4.3 Traffic Survey Stations ................................................................................................. 116 7.4.4 Vehicle Classification ....................................................................................................117 7.4.5 Traffic Count and Analysis ............................................................................................117 7.4.6 Generated Traffic ..........................................................................................................135 7.4.7 Traffic Growth and Forecast ......................................................................................... 139 7.4.8 Traffic Loading .............................................................................................................. 149 7.5 Subgrade Soil Investigation. ................................................................................................ 158 7.5.1 General ......................................................................................................................... 158 7.5.2 Soil Extension Survey ...................................................................................................158 7.5.3 Sampling and Logging ..................................................................................................159 7.5.4 Subgrade Soil Analysis. ................................................................................................160 7.5.5 Subgrade Soil Data Interpretation ................................................................................ 165 Engineering Works Consultant PLC. iii Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 7.5.6 7.6 Unsuitable soil sections ................................................................................................ 166 Pavement Design .................................................................................................................169 7.6.1 Pavement Design Using ERA’s Pavement Design Manual. ........................................169 7.6.2 Design of Shoulder ....................................................................................................... 174 7.7 Design for Geo-Hazards ...................................................................................................... 177 7.7.1 Weak Subgrade Soil Sections ......................................................................................177 7.7.2 Treatment of Weak subgrade and/or expansive clay soils .......................................... 180 7.7.3 Treatment method for weak subgrade sections: ..........................................................180 7.7.4 Treatment method for expansive clay soil sections: .................................................... 180 7.7.5 Erodible Soil Sections ...................................................................................................181 7.7.6 Treatment method for erodible soils .............................................................................181 7.7.7 Swampy or Water Logged Sections ............................................................................. 182 7.7.8 Treatment of Swampy Sections ................................................................................... 182 7.8 8 Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Construction Material Investigation. .................................................................................... 182 7.8.1 General ......................................................................................................................... 182 7.8.2 Rock Sources for Surfacing, Base, Concrete and Masonry Works .............................183 7.8.3 Natural Gravel for Subbase, Capping Layer and Embankment .................................. 185 7.8.4 Natural Sand Sources /Fine Aggregate ....................................................................... 187 7.8.5 Water Sources for Construction ................................................................................... 187 GEOTECHNICAL DESIGN .........................................................................................................188 8.1 Geological Setting ................................................................................................................ 188 8.1.1 Geological Setting of the Project Area ......................................................................... 188 8.1.2 Local Road Corridor Geological Settings ..................................................................... 189 8.2 Seismic Setting and Earthquake Hazards ...........................................................................190 8.3 Site Reconnaissance for Slope Stability ..............................................................................191 8.4 Problematic Sub-Grade Soil Sections ................................................................................. 191 8.4.1 Expansive and/or Weak subgrade sections .................................................................191 8.5 Near Surface Ground water/ Swampy Section ....................................................................194 8.6 Erodible Soil ......................................................................................................................... 194 8.7 Design of Embankments, Cuttings and Retaining Structures ............................................. 195 8.7.1 Design of Embankments .............................................................................................. 195 8.7.2 Design of Cuttings ........................................................................................................ 198 8.7.3 Safe Angle of Cut Slope and Berms ............................................................................ 199 8.7.4 Recommended Back Slopes for the Project Alignment ............................................... 200 8.7.5 Method of Rock Excavation ..........................................................................................202 8.7.6 Design of Retaining Structures .....................................................................................203 Engineering Works Consultant PLC. iv Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 8.7.7 8.8 Drainage Controls .........................................................................................................205 Bridge Foundation Investigation .......................................................................................... 205 8.8.1 General ......................................................................................................................... 205 8.8.2 Field Investigation .........................................................................................................206 8.9 9 Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Conclusion ............................................................................................................................214 STRUCTURAL DESIGN ............................................................................................................. 215 9.1 General .................................................................................................................................215 9.2 Structures Design Standard .................................................................................................215 9.2.1 Methodology ................................................................................................................. 215 9.2.2 Loading ......................................................................................................................... 215 9.3 Permanent Loads .................................................................................................................216 9.4 Transient loads .....................................................................................................................216 9.5 Environmental Effects .......................................................................................................... 217 9.5.1 Materials ....................................................................................................................... 219 9.6 Structure Type Selection ......................................................................................................220 9.7 Structural Evaluation of Existing Structures ........................................................................ 221 9.7.1 9.8 Major and Minor Drainage Structures .......................................................................... 221 Detail Design ........................................................................................................................ 223 9.8.1 Bridges .......................................................................................................................... 223 9.8.2 Culverts ......................................................................................................................... 223 9.9 Structures in the Project .......................................................................................................224 9.9.1 Major Structures ........................................................................................................... 224 9.9.2 Minor Structures ........................................................................................................... 225 10 UTILITIES AND PRIVATE ACCESSES ................................................................................. 226 10.1 Utilities ..................................................................................................................................226 10.2 Private Accesses ..................................................................................................................226 Engineering Works Consultant PLC. v Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 ANNEXES Appendix 1. Hydrology & Hydraulics Analysis Appendix 2. List of horizontal and vertical alignment data Appendix 3. Typical Cross-Section Appendix 4. General Plan and Elevation Drawings Appendix 5. Masonry Abutment and Wing-wall Design Appendix 6. Statistical Calculation of Bridges Appendix 7. Construction materials location Appendix 8. Laboratory test results Appendix 9. Traffic Analysis LIST OF TABLES Table 1- 1: Contract Data ........................................................................................................................2 Table 1- 2: Project Description ................................................................................................................3 Table 1- 3: Project Control Points ...........................................................................................................3 Table 2- 1: Road segments of the project .............................................................................................. 6 Table 2- 2: Road segment class ............................................................................................................. 6 Table 3- 1: List of Survey instruments .................................................................................................. 16 Table 3- 2: List personnel’s (team 1: GPS team) ................................................................................. 17 Table 3- 3: List personnel’s (team 2: Control traverse survey& Topographic Survey) ........................ 17 Table 4- 1:: Return Periods Considered (ERA Drainage Design Manual 2013) ................................. 25 Table 4- 2: Flood estimation methods (Table 5-3 of ERA DDM). ........................................................ 25 Table 4- 3: Physiographic and climate data ......................................................................................... 28 Table 4- 4: Monthly Highest Rainfall Data ............................................................................................ 30 Table 4- 5: 24hr Rainfall Depth Vs Frequency ..................................................................................... 31 Table 4- 6: Derived Run-off Coefficients (C) ........................................................................................ 37 Table 4- 7: Run-off Coefficient (C) as per ERA Drainage Design Manual 2002) ................................ 37 Table 4- 8: Frequency factor, Cf ........................................................................................................... 37 Table 4- 9: Roughness Coefficients (Manning’s n) for Sheet Flow ......................................................39 Table 4- 10: Coefficients for SCS Peak Discharge Method ................................................................. 43 Table 4- 11: Input of hydraulic data for HY8 from Hundi Gudina Scl Nejebac Kidane Mihret @km 2+060 .................................................................................................................................................... 50 Table 4- 12: Free board recommendation as per ERA DDM ...............................................................52 Table 4- 13: Roughness coefficients and Maximum permissible velocity ........................................... 55 Table 5- 1: Road segment class and road width .................................................................................. 62 Table 5- 2: Road functional Classification verses Design Period ........................................................ 65 Engineering Works Consultant PLC. vi Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 5- 3: Traffic forecast of road segment 6 and 7 at station 1 for the years 2028– 2047 ............. 65 Table 5- 4: Traffic forecast of road segment 2 at station 2 for the years 2028– 2047 ........................66 Table 5- 5: Traffic forecast of road segment 3 at station 2 for the years 2028– 2047 ........................67 Table 5- 6: Traffic forecast of road segment 1-1 at station 2 for the years 2028– 2047 .................... 68 Table 5- 7: Traffic forecast of road segment 1-2 at station 2 for the years 2028– 2047 .................... 68 Table 5- 8: Traffic forecast of road segment 5 at station 3 for the years 2028– 2047 ........................69 Table 5- 9: Traffic forecast of road segment 4, 8 and 9 at station 4 for the years 2028– 2047 ......... 70 Table 5- 10: Design Standard for sections of the Project Road ..........................................................71 Table 5- 11: Terrain Classification of the Road Project ........................................................................72 Table 5- 12: Percentage distribution of terrain ..................................................................................... 73 Table 5- 13: Design vehicle physical characteristics ............................................................................75 Table 5- 14: Design Vehicle ..................................................................................................................75 Table 5- 15: Design Vehicle for each road class ..................................................................................76 Table 5- 16: Design Standards ............................................................................................................. 78 Table 5- 17: Slope Ratio Table – Vertical to Horizontal ....................................................................... 80 Table 5- 18: Road segment of the project road ....................................................................................81 Table 5- 19: Road segment by percentage curve lengths .................................................................. 81 Table 5- 20: Comparison of sections by speed distribution relative to the overall length of the curve82 Table 5- 21: Built up areas ....................................................................................................................85 Table 5- 22: Summary of Vertical Alignment Analysis Road segment -1 ............................................ 86 Table 5- 23: Summary of Vertical Alignment Analysis Road segment -2 ............................................ 87 Table 5- 24: Summary of Vertical Alignment Analysis Road segment -3 ............................................ 87 Table 5- 25: Summary of Vertical Alignment Analysis Road segment -4 ............................................ 87 Table 5- 26: Summary of Vertical Alignment Analysis Road segment -5 ............................................ 88 Table 5- 27: Summary of Vertical Alignment Analysis Road segment -6 ............................................ 88 Table 5- 28: Summary of Vertical Alignment Analysis Road segment -7 ............................................ 88 Table 5- 29: Summary of Vertical Alignment Analysis Road segment -8 ............................................ 89 Table 5- 30: Summary of Vertical Alignment Analysis Road segment -9 ............................................ 89 Table 5- 31: Summary of Vertical Alignment Analysis Road segment -10 .......................................... 89 Table 5- 32: Departure from Minimum Horizontal Curve Radii for Road segment-1 ...........................95 Table 5- 33: Departure from Minimum Horizontal Curve Radii for Road segment-6 ...........................96 Table 5- 34: Departure from Maximum Grade for Road segment -1 ................................................... 97 Table 5- 35: Departure from Maximum Grade for Road segment -2 ................................................... 98 Table 5- 36: Departure from Maximum Grade for Road segment -2 ................................................... 98 Table 6- 1: Motor vehicle accidents in Ethiopia, 2003/04 - 2007/08 .................................................. 105 Table 6- 2: Severity of traffic accidents in Ethiopia ............................................................................ 106 Engineering Works Consultant PLC. vii Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 6- 3: Crashes by Driver Age, Education, and Gender, July 2005-June 2011 ..........................107 Table 6- 4: Road Traffic Fatality Crashes by Road Type and Road Pavement July 2005-June 2011 ............................................................................................................................................................ 107 Table 6- 5: Fatal and Injury Crashes in the Six Year Period by Lanes/Medians, Road Alignment, Junction Type and Illumination Conditions ........................................................................................ 108 Table 6- 6: Crashes by Land Use ....................................................................................................... 109 Table 6- 7: Guide post Spacing .......................................................................................................... 112 Table 7- 1: Traffic Survey Stations, Road Section, Duration and Purpose of the Count ...................116 Table 7- 2: Vehicle Classification ........................................................................................................117 Table 7- 3: Day Time Traffic Count Survey Result: Station 1 ............................................................ 118 Table 7- 4: Day Time Traffic Count Survey Result: Station 2 ............................................................ 118 Table 7- 5: Day Time Traffic Count Survey Result: Station 3 ............................................................ 119 Table 7- 6: Day Time Traffic Count Survey Result: Station 4 ............................................................ 119 Table 7- 7: Night Time Traffic Count Survey Result: Station 1 .......................................................... 120 Table 7- 8: Night Time Traffic Count Survey Result: Station 2 .......................................................... 120 Table 7- 9: Night Time Traffic Count Survey Result: Station 3 .......................................................... 120 Table 7- 10: Night Time Traffic Count Survey Result: Station 4 ........................................................ 120 Table 7- 11: Night Factor: Station 1 ....................................................................................................121 Table 7- 12: Night Factor: Station 2 ....................................................................................................121 Table 7- 13: Night Factor: Station 3 ....................................................................................................122 Table 7- 14: Night Factor: Station 4 ....................................................................................................123 Table 7- 15: Motorized Average Daily Traffic (ADT): Station 1 ..........................................................123 Table 7- 16: Motorized Average Daily Traffic (ADT): Station 2 ..........................................................124 Table 7- 17: Motorized Average Daily Traffic (ADT): Station 3 ..........................................................124 Table 7- 18: Motorized Average Daily Traffic (ADT): Station 4 ..........................................................124 Table 7- 19: Day Time Non-motorized Traffic survey result: Station 1 .............................................. 125 Table 7- 20: Day Time Non-motorized Traffic survey result: Station 2 .............................................. 125 Table 7- 21: Day Time Non-motorized Traffic survey result: Station 3 .............................................. 126 Table 7- 22: Day Time Non-motorized Traffic survey result: Station 4 .............................................. 126 Table 7- 23: Night Time Non-motorized Traffic survey result: Station 1 ............................................126 Table 7- 24: Night Time Non-motorized Traffic survey result: Station 2 ............................................127 Table 7- 25: Night Time Non-motorized Traffic survey result: Station 3 ............................................127 Table 7- 26: Night Time Non-motorized Traffic survey result: Station 4 ............................................127 Table 7- 27: Night Factor: @ station 1 ................................................................................................127 Table 7- 28: Night Factor: @ station 2 ................................................................................................128 Table 7- 29: Night Factor: @ station 3 ................................................................................................128 Engineering Works Consultant PLC. viii Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 7- 30: Night Factor: @ station 4 ................................................................................................129 Table 7- 31: Non-Motorized Average Daily Traffic (ADT)-Station 1 ...................................................130 Table 7- 32: Non-Motorized Average Daily Traffic (ADT)-Station 2 ...................................................130 Table 7- 33: Non-Motorized Average Daily Traffic (ADT)-Station 3 ...................................................130 Table 7- 34: Non-Motorized Average Daily Traffic (ADT)-Station 4 ...................................................130 Table 7- 35: Modal shift Traffic ........................................................................................................... 131 Table 7- 36: Summary of Normal Traffic – Station 1 ..........................................................................132 Table 7- 37: Summary of Normal Traffic – Station 2 ..........................................................................132 Table 7- 38: Summary of Normal Traffic – Station 3 ..........................................................................132 Table 7- 39: Summary of Normal Traffic – Station 4 ..........................................................................133 Table 7- 40: Potential Distributed Traffic to the project roads assumptions ...................................... 133 Table 7- 41: Potential Distributed Traffic to the project roads from Station 2 (Wereda Administration) Road segment 2 ................................................................................................................................. 134 Table 7- 42: Potential Distributed Traffic to the project roads from Station 2 (Wereda Administration) Road segment 3 ................................................................................................................................. 134 Table 7- 43: Potential Distributed Traffic to the project roads from Station 2 (Wereda Administration) Road segment 1-1 .............................................................................................................................. 134 Table 7- 44: Potential Distributed Traffic to the project roads from Station 2 (Wereda Administration) Road segment 1-2 .............................................................................................................................. 134 Table 7- 45: Potential Distributed Traffic to the project roads from Station 4 (Agape Hotel) Road segment 1-1 ........................................................................................................................................ 135 Table 7- 46: Potential Distributed Traffic to the project roads from Station 3(Main trunk road) ........ 135 Table 7- 47: Travel time to estimate Generated Traffic Factor .......................................................... 136 Table 7- 48: Station 4-Estimate of Generated Traffic Factors from the travel time ........................... 136 Table 7- 49: Station 1-Potential Generated Traffic for Project Road (taking medium scenario) ....... 137 Table 7- 50: Seasonal Conversion Factor .......................................................................................... 138 Table 7- 51: AADT of the Normal Traffic at 2023–Station 1 .............................................................. 139 Table 7- 52: AADT of the Normal Traffic at 2023–Station 4 .............................................................. 139 Table 7- 53: Schedule for Implementation of the Project ................................................................... 140 Table 7- 54: Base year Traffic (at 2028) - AADT1 – Station 1(Road segment 6&7) ......................... 140 Table 7- 55: Base year Traffic (at 2028) - AADT1 – Station 2 (Road segment 2) .............................140 Table 7- 56: Base year Traffic (at 2028) - AADT1 – Station 2 (Road segment 3) .............................141 Table 7- 57: Base year Traffic (at 2028) - AADT1 – Station 2 (Road segment 1-1) ..........................141 Table 7- 58: Base year Traffic (at 2028) - AADT1 – Station 2 (Road segment 1-2) ..........................141 Table 7- 59: Base year Traffic (at 2028) - AADT1 – Station 3 Road segment 5 ............................... 142 Table 7- 60: Base year Traffic (at 2028) - AADT1 – Station 4 (Road segment 4,8 & 9) ................... 142 Engineering Works Consultant PLC. ix Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 7- 61: Traffic forecast of road segment 6 and 7 at station 1 for the years 2028– 2047 ......... 143 Table 7- 62: Traffic forecast of road segment 2 at station 2 for the years 2028– 2047 ....................143 Table 7- 63: Traffic forecast of road segment 3 at station 2 for the years 2028– 2047 ....................144 Table 7- 64: Traffic forecast of road segment 1-1 at station 2 for the years 2028– 2047 ................ 145 Table 7- 65: Traffic forecast of road segment 1-2 at station 2 for the years 2028– 2047 ................ 146 Table 7- 66: Traffic forecast of road segment 5 at station 3 for the years 2028– 2047 ....................146 Table 7- 67: Traffic forecast of road segment 4, 8 and 9 at station 4 for the years 2028– 2047 ..... 147 Table 7- 68: Design Standard for sections of the Project Road .........................................................148 Table 7- 69: Equivalency Factors, ESA/Vehicle Type ........................................................................150 Table 7- 70: CESA for Road segment 6 and Road segment 7 at Station 1 ..................................... 151 Table 7- 71: CESA for Road segment 2 and 10 at Station 2 ............................................................ 152 Table 7- 72: CESA for Road segment 3 at Station 2 ........................................................................ 153 Table 7- 73: CESA for Road segment 1-1 at Station 2 ..................................................................... 154 Table 7- 74: CESA for Road segment 1-2 at Station 2 ..................................................................... 155 Table 7- 75: CESA for Road segment 5 at Station 3 ........................................................................ 156 Table 7- 76: CESA for Road segment 4,8 and 9 at Station 4 ........................................................... 157 Table 7- 77: Design Traffic Classes ....................................................................................................158 Table 7- 78: Summary of the roadbed materials ................................................................................ 159 Table 7- 79: Analysis and interpretation of sub grade soil ................................................................. 165 Table 7- 80: Comparison of project rating with AASHTO rating ........................................................ 166 Table 7- 81: Unsuitable soil stretches for all Road segments of the Project ..................................... 167 Table 7- 82: Design CBR and sub grade class before and after treatment .......................................170 Table 7- 83: summery of sub grade and traffic class for the section of the road Segments. ............ 170 Table 7- 84: Pavement thickness as per ERA 2013 Flexible Pavement Design Manual Chart B1 .. 172 Table 7- 85: Pavement thickness as per ERA 2013 Flexible Pavement Design Manual Chart B1 .. 173 Table 7- 86: Shoulder Pavement thickness ........................................................................................175 Table 7- 87: Weak and/or Expansive subgrade stretches in the road segments of the project .......177 Table 7- 88: Existing gully locations along the proposed road ...........................................................181 Table 7- 89: Locations of Quary Materials Identified along the Road Segments .............................. 184 Table 7- 90: Locations of Natural Gravel Materials Identified along the Road Segments .................185 Table 7- 91: Water source On the Vicinity of Road Segments. ......................................................... 187 Table 8- 1: List of problematic subgrade sections ..............................................................................192 Table 8- 2: Erodible soil section (Formation of Gully) ........................................................................ 194 Table 8- 4: Design criteria for settlement, side slope stability and bearing capacity of embankments ............................................................................................................................................................ 195 Table 8- 5: High fill sections along the road project ........................................................................... 196 Engineering Works Consultant PLC. x Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 8- 6: Design Criteria for Cut Slope Stability ..............................................................................199 Table 8- 7: Slope Ratio Table – Vertical to Horizontal ....................................................................... 199 Table 8- 8: Recommended back slope ratio .......................................................................................200 Table 8- 9: Lists of Major Crossing Sites ............................................................................................206 Table 8- 10: Typical Correlation between DCP and SPT-N Values ...................................................210 Table 8- 11: Summaries of DCP test results and SPT N-values of each Bridge ...............................211 Table 8- 12: Summary of bearing capacity Obtained from DCP Test for each Bridge based on N55 ............................................................................................................................................................ 213 Table 9- 1:: Drag Coefficient .............................................................................................................. 218 Table 9- 2: Lateral Drag Coefficient ...................................................................................................219 Table 9- 3: Schedule of Major Structures ........................................................................................... 224 Table 10- 1: Utilities along the project road ........................................................................................226 LIST OF FIGURES Figure 1- 1: Location Map ....................................................................................................................... 5 Figure 2- 1: All the Project road segments of Chiro Town Internal Asphalt Road Project .....................7 Figure 2- 2: Roads from Muz Tera to TTC, Kebt Tera to Aana Ciro, Sumayewu Bridge to Addis Ketema, Agape Hotel to Agricultural research institute then to TTC, Agricultural Research Institute to Odaa Bultum University, Chiro town administration to Madhicho No 2 School then Madhicho No.9 (Leyila), Hundi Gudina Scl-Nejebac Kidane Mihret, Hundi Gudina Scl-Aschalew Hotel, Blood BankGende Kuteba Bono. .............................................................................................................................. 8 Figure 2- 3: Roads from Muz Tera to TTC ............................................................................................. 8 Figure 2- 4: Roads from Kebt Tera to Aana Ciro and Sumayewu Bridge to Addis Ketema ..................9 Figure 2- 5: Roads from Agape Hotel to Agricultural research institute then to TTC and Agricultural Research Institute to Odaa Bultum University ....................................................................................... 9 Figure 2- 6: Roads from Chiro town administration to Madhicho No 2 School then Madhicho No.9 (Leyila) .................................................................................................................................................. 10 Figure 2- 7: Hundi Gudina Scl to Nejebac Kidane Mihret(S7) & Hundi Gudina Scl-Aschalew Hotel(S8) .............................................................................................................................................................. 10 Figure 2- 8: Blood Bank to Gende Kuteba Bono(S9.1,S9.2,S9.3,S9.4,S9.5). .....................................11 Figure 4- 1: Existing Condition of Major and minor Cross Drainage Structures .................................. 29 Figure 4- 2: Climatic Zones of the Project Area ................................................................................... 30 Figure 4- 3: Mean Monthly Rainfall of Asebe Teferi ............................................................................. 31 Figure 4- 4: From NMA, IDF Curve of Asebe Teferi metrological analysis ..........................................32 Figure 4- 5: Preliminary Delineated Watershed Area ...........................................................................33 Figure 4- 6: Hydrologic Soil Group Map of the Project Area ................................................................34 Engineering Works Consultant PLC. xi Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Figure 4- 7: Land use/Cover of the Road Project Area ........................................................................ 35 Figure 4- 8: Muztera Tcc @ 0+378 Delineated Watershed Area and Drainage Pattern ..................... 45 Figure 4- 9: Hydrograph for Muztera Tcc @ 0+378 ............................................................................. 45 Figure 4- 10: Kebte Tera Chiro wereda @ 1+020 Delineated Watershed Area and Drainage Pattern .............................................................................................................................................................. 46 Figure 4- 11: Hydrograph for Kebte Tera Chiro wereda @ 1+020 .......................................................46 Figure 4- 12: Design Nomograph for the Concrete Pipe Design ......................................................... 49 Figure 4- 13: HY-8 hydraulic analysis output result along the culvert at station 2+060 ...................... 51 Figure 4- 14: HEC-RAS Output after addining Bridge waterprofile ......................................................53 Figure 5- 1: Design Vehicle template ....................................................................................................77 Figure 5- 2: Reciprocal of radii plot against the Chainages for road segment 1: (0-5+789.96) .......... 83 Figure 5- 3: Reciprocal of radii plot against the Chainages for Road segment 2: (0-1+238.25) ........ 83 Figure 5- 4: Reciprocal of radii plot against the Chainages for Road segment 3: (0-0+519.33) ........ 83 Figure 5- 5: Reciprocal of radii plot against the Chainages for Road segment 5: (0-1+237) ............. 84 Figure 5- 6: Reciprocal of radii plot against the Chainages for Road segment 6: (0-6+186) ............. 84 Figure 5- 7: Reciprocal of radii plot against the Chainages for Road segment 7: (0-2+760) ............. 84 Figure 5- 8: Reciprocal of radii plot against the Chainages for Road segment 8: (0-0+861) ............. 85 Figure 5- 9: Reciprocal of radii plot against the Chainages for Road segment 9: (0-0+817) ............. 85 Figure 5- 10: Spatial distribution of gradients for road segment 1: (0+000 – 5+789.96) ....................90 Figure 5- 11: Spatial distribution of gradients for road segment 2: (0+000 – 1+238.25) ....................91 Figure 5- 12: Spatial distribution of gradients for road segment 3: (0+000 – 0+519.33) ....................91 Figure 5- 13: Spatial distribution of gradients for road segment 4: (0+000 – 0+591.32) ....................91 Figure 5- 14: Spatial distribution of gradients for road segment 5: (0+000 – 1+237) ......................... 91 Figure 5- 15: Spatial distribution of gradients for road segment 6: (0+000 – 6+186) ......................... 92 Figure 5- 16: Spatial distribution of gradients for road segment 7: (0+000 – 2+760) ......................... 92 Figure 5- 17: Spatial distribution of gradients for road segment 8: (0+000 – 0+861) ......................... 92 Figure 5- 18: Spatial distribution of gradients for road segment 9: (0+000 – 0+817) ......................... 93 Figure 5- 19: Spatial distribution of gradients for road segment 10: (0+000 – 1+655.99) ..................93 Figure 5- 20: Illustration of the effects of using 8% maximum grade resulting in 11.2m deep cut at sta. 0+660 ( Road segment -1) ................................................................................................................. 100 Figure 5- 21: Illustration of the effects of using 9% maximum grade resulting in high fill 7.4 from sta. 2+300 to sta. 2+642 for ( Road segment -6) ......................................................................................101 Figure 5- 22: Exhibit 5.1: Fig 4.08 .......................................................................................................102 Figure 6- 1: Variation in Road Traffic Crashes By Time of Day, July 2005-June 2011 .....................106 Figure 6- 2: Motorized Traffic Volume by Time of Day on Selected Major Road Segments in 2011 (Ethiopian Roads Authority, 2012). .......106 Engineering Works Consultant PLC. xii Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Figure 6- 3: Concrete/Masonry Barrier Detail .....................................................................................113 Figure 7- 1: Summary of Soil Extension ............................................................................................. 159 Figure 7- 2: Variation of Plastic Index (PI) for the Road project .........................................................161 Figure 7- 3: Plasticity Chart for all project Road Segments Sub-grade soil .......................................162 Figure 7- 4: Percentage compositions of sub-grade soil for all Road Segments of the Project. .......162 Figure 7- 5: Variation of MDD along All road segments. ....................................................................163 Figure 7- 6: Variation of OMC along All road segments .....................................................................164 Figure 7- 7: CBR Value for all Road segments of the Project ............................................................164 Figure 7- 8: Variation of CBR-swell value for all Road segments of the Project ............................... 165 Figure 7- 9: crushed aggregate(Crusher site) and Quarry site for Base course at station 5+818 offset 0.15km RHS and 1+8 offset 1.2Km LHS with in vicinity of Road Segments ....................................185 Figure 7- 10: 4+900 Offset 0.1Km LHS Subbase existing source ..................................................... 186 Figure 7- 11: 2+600 Offset 0.14Km LHS towards, Sub base New source ........................................ 186 Figure 8- 1: Erodible soil section (gully section) .................................................................................194 Figure 8- 4: River crossing at Km 0+420 (chiro River side bank) ...................................................... 207 Figure 8- 5: River crossing at Km 5+480 (chiro River side bank) ...................................................... 207 Figure 8- 6: River crossing at Km 1+055 ............................................................................................207 Figure 8- 7: River crossing at Km 0+210 ............................................................................................208 Figure 8- 8: River crossing at Km 0+160 ............................................................................................208 Figure 8- 9: Schematic representation of DCP ...................................................................................209 Figure 8- 10: Graphic form of DCP to SPT N-30 ................................................................................211 Figure 9- 1: Designs truck ...................................................................................................................217 Figure 9- 2: Designs tandem ...............................................................................................................217 Figure 9- 3: Plan View of Pier Showing Stream Flow Pressure .........................................................219 Engineering Works Consultant PLC. xiii Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 EXECUTIVE SUMMARY Introduction The Oromia Roads and Logistics Bureau (ORLB) has allocated funds towards the consultancy services to carry out a Route Selection, Feasibility Study, Topographic Survey, and Drainage Facility Study, Detailed Engineering Design and Tender Document preparation and Economic Evaluation for Chiro Town Internal Asphalt Road Project. The Oromia Roads and Logistics Bureau (ORLB) invites all eligible local Road Consultants for Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. ORLB has been given the mandate for the construction, restoration, expansion and maintenance of Regional road network. Its goal is to improve transport operating efficiency and reduce road transport costs, provide access to rural, neglected and food-deficit areas and develop institutional capacity of the sector. Accordingly, The Oromia Roads and Logistics Bureau (ORLB) has employed Stadia Engineering Works Consultant for the consultancy for Route Selection, Feasibility Study, Topographic Survey, Drainage Facility Study, Detailed Engineering Design and Tender Document preparation and Economic Evaluation for Chiro Internal Town Asphalt Road Project. The objective of the project is to complete the road to Asphaltic concrete standard. The objectives of the consultancy services are: Phase I 1. Route selection and Topographic Survey 2. Feasibility Study including Preliminary Design, Environmental and Social Impact Assessment (EIA) Phase II 1. Detailed Engineering Design including preparation of tender Documents, Roads network Development and 2. Submission of Resettlement Action Plan (RAP) The progression of the Consultancy from Phase I to Phase II will depend on the results of the Feasibility Study, and the EIA. If the results show that the road is not viable for the proposed construction, then Phase II shall not be undertaken. As such, each phase of the Consultancy shall be priced separately. Authorization for the commencement of Phase II will be given by ORLB based Engineering Works Consultant PLC. II Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 on the viability of the project. It will also be based on the performance of the Consultant during Phase I. Hydrology and Hydraulics Hydrology The hydrological analysis is the most important step prior to the hydraulic design of any drainage structure. Assessment of hydrological condition involves study of landscape characteristics of the watershed area including topographic conditions, soil characteristics, land cover, land use and climate conditions including atmospheric temperature and rainfall. As the relation between the amount of precipitation on a drainage basin and the amount of runoff from the basin is complex and too little data is available on the factors influencing the rainfall – runoff relationship, hydrologic analysis does not bring an exact solution in peak discharge determination. However, peak discharge generated from a given basin can be estimated reasonably by different methods depending upon physiographic and climatic factor on the area. The methods and step by step procedures stated in Design standard section of this report reproduced from ERA DDM, 2013 has been used to conduct a detailed hydrological analysis of the project. Hydraulics Highway hydraulic structures perform the vital function of conveying, diverting, or removing surface water from the Highway right-of-way. Structures should be designed to be commensurate with risk, construction cost, importance of the road, economy of maintenance, and legal requirements based on the outlined design criteria specified at Design Standard section of this report. One type of drainage facility will rarely provide the most satisfactory drainage for all sections of a Highway. Bridge, major to minor culverts and open channels are the major drainage structures analyzed and required under Chiro Town Internal Asphalt Road Project. Major defined and shallow flow concentration sections are provided by bridges and major culverts. Open channels/ditches are also designed and provided along the road to cutter runoff generated from road surface and adjacent ground. Masonry U- ditch has been designed to convey and dispose runoff on town and steep grade section with longitudinal slope exceeds 5%. Trapezoidal ditch also designed in rural sections under mild slope configuration. Peak discharge for different return periods has been computed and hydraulic sizing of the structures has been made based on hydrologic and geometric inputs taking into account the site prevailing conditions too. Recent advanced and recommended hydraulic modelling software have been employed for side ditch, culvert and bridge designs. Engineering Works Consultant PLC. III Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Drainage structures hydraulic evaluation and sizing has been made for stream crossings of the proposed alignment. HY 87.12 culvert hydraulic design software’s with strong modelling capability than spreadsheet based simplified approach have been used for culvert hydraulic evaluation and sizing purpose. From hydrological analysis it has been realized that the runoff response characteristics of the identified small streams is relatively moderate and brought relatively low magnitude discharge values. Hydraulic size of the culvert by large considered site prevailing conditions related to probable siltation and debris flow. Bridge hydraulic modelling for identified position has been carried out using HEC RAS modelling with strong hydraulic modelling capacity. Design criteria limiting the potential maximum backwater rise on the immediate upstream section of the bridge (< 0.5m), keeping the upstream bridge approach flow contraction and down stream flow expansion stretch length a bit relaxed to avoid any impact oriented flow condition at bridge inletoutlet section has been considered in bridge hydraulic efficiency evaluation .Hydrological data from hydrological analysis ,geometric data from ground survey work and material data from geotechnical characterization of the rivers has been used as an analysis input. A total of 71 drainage structures have been designed on section of the roads where all structures are considered as Pipe, bridge and culverts (54 pipes, 12 slabs and 5 Bridges). Geometric Design For most road projects, economic analysis period of between 10 and 20 years from the date of opening is considered. For the subject project a design period of 20 years from the year the road is opened to traffic i.e. (2028 - 2047) is considered for geometric design. The project road is expected to be opened to traffic in the year 2028. From traffic analysis and road functional classification findings, the project road is designed to DC6 and DC7 design standard as per ERA Geometric Design Manual 2013. The consultant concludes that the road shall be constructed to DC6 Design standard. Pavement Design Existing Pavement Condition Pavement condition survey was made along the existing Chiro-Town Internal Asphalt road project. The condition of the existing road section is assessed to check its effect on the new Asphalt surface pavement design of the project and to determine the treatment measures required to maintain/reconstruct the road. During the reconnaissance site visit, visual subgrade soil extension survey was carried out to determine the extent of the subgrade materials along the accessible sections of project route corridor. Engineering Works Consultant PLC. IV Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 The project area dominant road bed material of Chiro Town Road Segments Are Dark brown silty CLAY soil which is commonly Poor roadbed material. Sub-grade Strength The field investigation tasks were carried out for the Chiro Town Internal Asphalt Road project to undertake the subgrade soils investigation, which includes the geological setting of the project area, soil extension, sampling and logging, etc. AASHTO soil classification reveals that the sub grade materials along all Road Segments section of the alignments mainly classified as A-1-b, A-2-7, A-4, A-6, A-7-5 and A-7-6 soil groups. Out of the Six Groups A-7-6 comprise 35.3% of the sub grade material (the largest proportion) which is followed by A-7-5, 33.3% then A-2-7,25.5% and A-1-b, A-4 and A-6 materials which constituent 2%, 2% and 2% of the sub grade soil, respectively. Samples of sub grade were delivered to Stadia Engineering Works Consultant central laboratory for the relevant quality tests. In performing the laboratory tests, AASHTO and BS testing methods have been used. 51 samples of sub-grade materials were collected from the road segments alignment at every 0.5km interval to assess the properties of the road bed materials. Classification tests (sieve analysis, atterberg limits, linear shrinkage and natural moisture content) and modified proctor, three point CBR and swell tests were conducted on samples collected at interval of 0.5km. The laboratory determined CBR Values were analysed carefully, and a fairly homogeneous sections based on the CBR values were determined. For this purpose, methodology recommended by AASHTO Pavement design guide “Analysis Unit Delineation by Cumulative Differences” has been adopted to determine homogeneous sections with respect to the bearing strength of the sub-grade soils. Accordingly, the entire Chiro Town Internal Asphalt Road project has been subdividing in following fairly homogenous sections as indicated below. Table: Sub grade classes for the whole road sections Section 90 Homogeneous section Length percentile [km) CBR Value before treatment Sub grade Class before treatment 90 percentile 90 CBR Value percentile after CBR Value treatment after treatment I. Chiro town Adminstration to Mtichu to Leila Road Segments Homogenous Section Engineering Works Consultant PLC. V Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Determination Section I1 (Km 0+000– Km 3+500) 3.5 2% S1 8 S4 Section I2 (Km 3+500 – Km6+208.54) 2.708 8% S4 15 S5 II. Muzi Tera to TTC to Qilisa Road Segments Homogenous Section Determination Section II3 (Km 0+000– Km 3+500) 3.5 2% S1 5 S3 Section II4 (Km 3+500 – Km6+047.38) 2.5047 2% S1 5 S3 III Hundi gudina School to Nejubas kidest Kidanmihiret Church,Hundi gudina School to Aschalew hotel, kebet tera to Chiro woreda office,Agriculthural research center to Oda Bultu University, Blood bank to Genda to Quteba bono, to Sumeya bridge to Addis ketema and Agape hotel to Agri research center to TTC, Chiro wereda office to Care Ethiopia Road SegmentsDesign CBR of Homogenous Sections. Section III5 (Km 0+000 to Km 2+765.67, 9.879 km 0+000 to km 0+855 km, km 0+000 to km 1+235.88, km 0+000 to km 1+235.88, 0+000 to km 1+040.14, 0+000 to km 1% S1 5 S3 0+518.98, km 0+000 to km 0+580,km 0+000 to km 1+647) Design Period Design period is the period during which the proposed pavement carries the estimated design traffic without major reconstruction works. Only routine and ordinary maintenance works is carried out to maintain the road to its expected minimum performance level. For most road projects, economic analysis period of between 10 and 20 years from the date of opening is considered. For the subject project a design period of 20 years from the year the road is opened to traffic i.e. (2028 - 2047) is considered for geometric design. The project road is expected to be opened to traffic in the year 2028. Table: Schedule for Implementation of the Project Activity Period Completion of Detail Design and tender process. End of 2023 Construction (5 years starting Beginning of 2024) 2024-2027 Completion of the construction End of 2027 Open for traffic Beginning of 2028 Design Period (20 years) 2028-2047 In the design of the pavement, the sub-grade design CBR values and Traffic classes obtained as discussed above will be used. The design is carried out by ERA Flexible Pavement Design manual, Engineering Works Consultant PLC. VI Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 2013. The design parameters together with the design chart have been used to design pavement structure. Traffic Loading Damage to a road pavement is not purely a function of the amount of traffic but rather the wheel or axle loading from the traffic. Light cars and vans have little effect on a pavement whilst heavily loaded trucks have a major impact. The vehicle damage factor is a multiplier for converting the number of commercial vehicles of different axle loads to the number of standard axle load repetitions. Design of the pavement structure is based upon the cumulative number of 8.16 tone equivalent standard axles (ESA) that will pass over the road during the design period. Equivalency factors as recommended by ERA Pavement Design Manual have been used to convert the axle load spectrum into an equivalent number of standard axles. It has been ascertained that the damaging effect of axles on flexible pavement is approximately proportional to the 4.5th power of the axle load as its computed using Liddle’s formula. The traffic study and detail analysis for of the subject road project revealed that, the expected number of cumulative equivalent standard axles over the design life of the project road (i.e.20 years’ design period) for Chiro Town Internal Road Project is classified in the following table of traffic Class according to ERA's design manuals, 2013. Table: Design Traffic Classes Station. No 1 2 3 4 Project Road Segments Cumulative number of Traffic Remark ESAs (106) class Road segment 6 and 7 0.656 T2/LV5 As per ERA PDM, 2013 Road segment 2 and 10 4.33 T5 As per ERA PDM, 2013 Road segment 3 2.45 T4 As per ERA PDM, 2013 Road segment 1-1 3.66 T5 As per ERA PDM, 2013 Road segment 1-2 3.32 T5 As per ERA PDM, 2013 Road segment 5 1.26 T3 As per ERA PDM, 2013 2.423 T4 As per ERA PDM, 2013 Road segment 4,8 and 9 Pavement Thickness Engineering Works Consultant PLC. VII Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 In the design of the pavement, the sub-grade design CBR values and Traffic classes obtained as discussed above will be used. The design is carried out by using ERA’s Flexible Pavement design manual (2013). Table summery of sub grade and traffic class for the section of the road Segments. 90 percentile CBR Value 90 Homogeneous section after treatment percentile Traffic class CBR Value after treatment I. Chiro town Adminstration to Mticho to Leila Road Segments Homogenous Section Determination Section I1 (Km 0+000– Km 3+500) 8 S4 T2/LV5 Section I2 (Km 3+500 – Km6+208.54) 19 S5 T2/LV5 II. Muzi Tera to TTC to Qilisa Road Segments Homogenous Section Determination Section II3 (Km 0+000– Km 3+500) 5 S3 T5 Section II4 (Km 3+500 – Km6+047.38) 5 S3 T5 III.1 Hundi gudina School to Nejubas kidest Kidanmihiret Church Km 0+000 to Km 2+765.67 5 S3 T2/LV5 III.2 kebet tera to Chiro woreda office and Chiro wereda office to Care Ethiopia km 0+000 to km 1+235.88 and km 0+000 to km 1+647 5 S3 T5 S3 T3 III.3 Agricultural research center to Oda Bultu University km 0+000 to km 1+235.88 5 III,Hundi gudina School to Aschalew hotel, Blood bank to Genda to Quteba bono, to Sumeya bridge to Addis ketema and Agape hotel to Agri research center to TTC Road SegmentsDesign CBR of Homogenous Sections. Section III5 (, km 0+000 to km 0+855 km, 0+000 to km 1+040.14, 0+000 to 5 S3 T4 km 0+518.98, km 0+000 to km 0+580) The ESAL for the road segments of Chiro town administration to Mitcho to leila is 0.656 Million. Even though 0.656 million ESAL is at the border of T3 traffic class, and manuals recommend to take the next traffic class in such cases. The above table indicates the combination of the homogenous sub grade class with that of the Traffic class as studied by the consultant Hence, the road Segments are designed using ERA Flexible Pavement Design Manual, 2013, Chart B1 with thin (50mm) Flexible AC Surfacing, Granular Road Base to meet the desired pavement surfacing thickness to withstand the traffic load in the design period. The thicknesses as adopted from the charts is presented in the tables below. Engineering Works Consultant PLC. VIII Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table: Pavement thickness as per ERA 2013 Flexible Pavement Design Manual Chart B1 Pavement Layer Thickness (mm) Sub grade Design Sub Sub Station grade CBR grade at Traffic Surfa Base class cing course AC CBR>100 (mm) % (mm) 93% class MDD Sub base CBR>30 % (mm) Remark Improved subgrade CBR>15 % I. Chiro town Adminstration to Mticho to Leila Road Segments Homogenous Section Determination Section I1 (Km 0+000– Km 3+500) Section I2 (Km 3+500 – Km6+208.54) 8 S4 T3 50 175 150 - 19 S5 T3 50 150 100 - ERA PDM, 2013, Chart B1 ERA PDM, 2013, Chart B1 II. Muzi Tera to TTC to Qilisa Road Segments Homogenous Section Determination Section II3 (Km 5 S3 T5 50 175 200 150 – 5 S3 T5 50 175 200 150 0+000– Km 3+500) Section II4 (Km 3+500 Km6+047.38) ERA PDM, 2013, Chart B1 ERA PDM, 2013, Chart B1 III.1 Hundi gudina School to Nejubas kidest Kidanmihiret Church Km 0+000 to Km 2+765.67 5 S3 T3 50 175 150 100 ERA PDM, 2013, Chart B1 III.2 kebet tera to Chiro woreda office and Chiro wereda office to Care Ethiopia km 0+000 1+235.88 to and km ERA km 5 S3 T5 50 175 200 150 175 150 100 PDM, 2013, Chart B1 0+000 to km 1+647 III.3 Agricultural research center to Oda Bultu University km 0+000 1+235.88 to km 5 S3 T3 50 ERA PDM, 2013, Chart B1 III,Hundi gudina School to Aschalew hotel, Blood bank to Genda to Quteba bono, to Sumeya bridge to Addis Engineering Works Consultant PLC. IX Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 ketema and Agape hotel to Agri research center to TTC Road SegmentsDesign CBR of Homogenous Sections. Section III5 (, km ERA 0+000 to km 0+855 km, 0+000 to km 1+040.14, 0+000 to km 0+518.98, 2013, Chart B1 5 S3 T4 50 175 200 100 km 0+000 to km 0+580) Sources of Construction Materials In conjunction with the subgrade soils, the investigations of the available construction materials were carried out in the project area. The investigation includes: Natural granular materials for gravel wearing course and subbase, Quarry stone for the production of aggregates for concrete and masonry works, Borrow material for embankment and improved sub grade, Water for compaction and concrete work and Sand for concrete and mortar works. Detailed investigation of material sources plays an important role in assisting the design of cost effective pavements by enhancing efficient use of the locally available construction materials. The construction materials investigation undertaken for the design of the road involved searching for and identification of suitable borrow pits and quarries which could provide an adequate quality and quantity of road construction materials within the vicinity of the road project. After identifying the potential material sources representative samples were taken for laboratory testing to establish the quality and suitability of the locally available road construction materials. Estimates of quantity was carried out for rock, gravel and borrow materials. This is done with the aid of hand held GPS to record the coordinate of the boundaries of the suitable materials. Area of the material is then calculated from the coordinates and the depth of usable material is measured from the test pits, and the quantity estimated from the area and the depth of the usable material. The depth of overburden material is also estimated and evaluated if the suitable material can be exploited economically. The potential sources of construction materials in the vicinity of the project area was investigated through the following activities: PDM, A desktop study of available information: The information that was studied includes geological maps, geological reports and topographical maps. Engineering Works Consultant PLC. X Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Interaction with local people and relevant bureau: Local people in the vicinity of the route and relevant bureau such as rural road authorities were enquired about the existence of potential sources of construction material. Field survey for potential sources: All potential sources were visually inspected and evaluated. Samples were taken if the material was considered suitable for the intended purpose. Laboratory tests were conducted on material samples: This was carried out to assess the material quality and compare the results with the required materials specifications. In general, prior to locating each kind of construction materials the following factors were considered: Performance of the materials which were used for the construction of the existing road; Accessibility; Quantity and Quality; Type and thickness of overburden materials; Availability of adequate space for erecting crusher and stockpiling; and Environmental and social aspects Taking into account these factors Six (6) potential sources of construction materials were located, which include possible sources of rock, natural gravel sources, and water. Moreover, representative samples were collected from those sources for further investigation of their quality in the laboratory. Natural Gravel for sub base, Capping Layer and Embankment The project road shall be constructed to the required standard that requires adequate quantity of materials for strong lower pavement layers at reasonable intervals. Special attention is therefore given to locating natural gravel sources that can be used for this pavement layers (i.e., sub base and capping layers). h brown silty sandy GRAVEL (Cinder material). Grey GRAVEL SILTY with SAND & CLAY and brown weathered GRAVEL silty clay sources could be identified at the Vicinity for all road segments. However, natural granular materials that comply with specification requirements for their use as sub base layers without further processing are often rare. This is mainly due to inconsistency in their grading as a result of frequent change in weathering pattern and extreme variability of geological processes that are responsible for their present state of occurrences. The locations of some road segments lie with in Chiro town. Therefore, there is no construction material along the road segments corridor and assessed around the vicinity of the town. The quality Engineering Works Consultant PLC. XI Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 of the materials exhibits significant variation within a source that consideration has been given to selective production, and sampling of the materials has been carried out accordingly. Accordingly, four (4) sources of natural gravel materials have been located and all source samples were taken from the borrow sites within the vicinity of the road Segments. Rock sources for Surfacing, Base, Concrete and masonry works During the field investigation, the quality and quantity of rocks, accessibility of the quarry locations, the overburden material depth and the suitability of the material for construction purposes are well assessed. Besides, the environmental and social impacts which may arise following the utilization of the rock quarry like displacement of local residents, claim for farm lands are assessed. Possible rock sources for aggregate for asphalt concrete, base course, concrete and masonry works are available within reasonable hauling distance. The quantity of available material has also been estimated. Ease of mining and development of quarry faces and suitability to erect a crusher plant have been considered as additional factors. Two (2) quarry sites and one masonry stone source are Sampled from 3 quarry and one masonary identified source along the road project which is considered as suitable by visual inspection which can likely be sources of base course, asphalt concrete, surfacing, concrete aggregates and masonry stone. From both source representative samples are collected to be tested at central laboratory to confirm their suitability for the intended purposes. The formation and characteristics of the rock sources along the road corridor is fresh to slightly weathered Basaltic formation for Aggregate quality test and Ignimbrite rock type for Masonry. Representative sample has been taken from the identified sources for further laboratory testing. The summary of the laboratory test results on the rock quarry samples is presented in Annex-III. Note that test for flakiness index is not included here; it shall be conducted during construction after erection of crusher plant. Natural Sand Sources /Fine Aggregate Natural sand is not available within the project area. The city communities used from mieso river sand (23km from chiro town), therefore we recommended to use this source with crushed sand by appropriate blending. Water Sources for Construction Water samples were collected from one identified potential water sources for PH, total dissolved solids, Cl and Sulphate content tests to check the quality of the water for the construction works. The PH values for all tested samples showed that they are within ERA’s specification limits for concrete works. The results of chemical analysis also revealed that the amount of the total dissolved Engineering Works Consultant PLC. XII Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 solids (TDS), Sulphate content and the Chloride content are much lower than the maximum limit in ERA’s specification requirements. The test result on water samples, along with the corresponding specification requirements is given in the Table below. Table: Summary of Laboratory Test Results of water sources S. GPS Chainage No. Coordinate km 1 0+370 Location E=705300, Cross N=1005052 segment Sample Type road perennial River Water ERA Standard Technical Specification (2013) TDS PH 7 to 9 Water for Concrete Works content content (mg/l) (mg/l) 5.87 6.54 220 2000 500mg/l 400mg/l Mg/l max. max. max. (mg/l) 6.9 Sulphate Chloride Structural Design Major Structures There are five major crossings in this project which singly supported simple spans superstructures composed RC Deck-Girder. All abutments are proposed to be made of masonry except the height of the abutment exceeds 9m. Table: Schedule of Major Structures Arrangement No. 1 2 Road Name Muzi tera to TTC No. of Clear Span Height Superstructure 24m 1 6m RC Deck Girder 5+280 10m 1 4m Slab Bridge woreda 1+020 18m 2 5.5m RC Deck Girder 0+167 7m 1 5m Slab Bridge 0+418 10m 2 4m Slab Bridge Muzi tera to TTC to Qilisa Chiro Span 0+378 to Qilisa Kebet 3 segment Station tera to Office 4 5 Sumeya Bridge to Addis ketema Hundi gudina school to Nejubas kidane Substructure Masonry Abutment and Wing-wall Masonry Abutment, Wing-wall and Pier Masonry Abutment and Wing-wall Masonry Abutment and Wing-wall Masonry Abutment and Wing-wall mihiret *Span rearranged from hydraulic recommendation for structural standard and construction simplicity Engineering Works Consultant PLC. XIII Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Minor Structures Along the project route, 66 crossings have been recommended for minor drainage structures by the hydrologist. Of which 54 is Reinforced Concert pipe culverts and the remaining are adopted as either Reinforced Concert Box or Reinforced Slab culverts. Almost all of the existing culverts are replaced mainly due to hydraulic inadequacy because they are mostly silted up. Engineering Works Consultant PLC. XIV Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 1 INTRODUCTION 1.1 Background Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 The Oromia Roads and Logistics Bureau (ORLB) has allocated funds towards the consultancy services to carry out a Route Selection, Feasibility Study, Topographic Survey, and Drainage Facility Study, Detailed Engineering Design and Tender Document preparation and Economic Evaluation for Chiro Town Internal Asphalt Road Project. The Oromia Roads and Logistics Bureau (ORLB) invites all eligible local Road Consultants for Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. ORLB has been given the mandate for the construction, restoration, expansion and maintenance of Regional road network. Its goal is to improve transport operating efficiency and reduce road transport costs, provide access to rural, neglected and food-deficit areas and develop institutional capacity of the sector. Accordingly, The Oromia Roads and Logistics Bureau (ORLB) has employed Stadia Engineering Works Consultant for the consultancy for Route Selection, Feasibility Study, Topographic Survey, Drainage Facility Study, Detailed Engineering Design and Tender Document preparation and Economic Evaluation for Chiro Internal Town Asphalt Road Project. The objective of the project is to complete the road to Asphaltic concrete standard. The objectives of the consultancy services are: Phase I 3. Route selection and Topographic Survey 4. Feasibility Study including Preliminary Design, Environmental and Social Impact Assessment (EIA) Phase II 3. Detailed Engineering Design including preparation of tender Documents, Roads network Development and 4. Submission of Resettlement Action Plan (RAP) The progression of the Consultancy from Phase I to Phase II will depend on the results of the Feasibility Study, and the EIA. If the results show that the road is not viable for the proposed construction, then Phase II shall not be undertaken. As such, each phase of the Consultancy shall be priced separately. Authorization for the commencement of Phase II will be given by ORLB based on the viability of the project. It will also be based on the performance of the Consultant during Phase I. Engineering Works Consultant PLC. 1 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 1.2 Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Contract Data and Management Table 1- 1: Contract Data Consultancy Services for Topographic Survey, Drainage Facility Name of the Consultancy services Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Project No. ORA/NCB/RFP/DP-03/2015 Source of Fund Oromia Roads & Logistics Bureau Consultant Stadia Engineering Works Consultant PLC Employer Oromia Roads & Logistics Bureau Topographic Type Of Service Survey, Drainage Facility Study, Detailed Engineering Design and Tender Document Preparation and Economic Evaluation Project Period 6 Months Consultancy Contract: Signed on 13st of March 2023 Commencement Date 24th of March 2023 Phase One services Route Selection Preliminary Planned Duration and Design, 2 months Survey, Feasibility Environmental Study, including Social Impact and Assessment (EIA) Phase Two services 4 months Detailed Engineering Design including preparation of bidding Documents and Resettlement Action Plan (RAP). Expected Completion Date Before September 24th, 2023 Project Cost: ETB 6,007,104.06 including 15% VAT 1.3 Scope of Services and Objectives The objectives of the consultancy services are: Phase I 1. Route selection and Topographic Survey 2. Feasibility Study including Preliminary Design, Environmental and Social Impact Assessment (EIA) Phase II 3. Detailed Engineering Design including preparation of tender Documents, Roads network Development and Engineering Works Consultant PLC. 2 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 4. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Submission of Resettlement Action Plan (RAP) The progression of the Consultancy from Phase I to Phase II will depend on the results of the Feasibility Study, and the EIA. If the results show that the road is not viable for the proposed construction, then Phase II shall not be undertaken. As such, each phase of the Consultancy shall be priced separately. Authorization for the commencement of Phase II will be given by ORLB based on the viability of the project. It will also be based on the performance of the Consultant during Phase I. 1.4 Project Description Table 1- 2: Project Description Project Name Chiro Town Internal Asphalt Road Design Project. Region / Zone Oromia Regional State Climate Classification Weina Dega (warm-cool) Elevation (m) (min – max) 1800 masl Table 1- 3: Project Control Points Road No. 1 2 3 Estimated Ending Coordinate (m) X Y X Y 6.03 20 704,907.14 1,004,944.29 707,296.45 1,001,481.38 1.24 20 705,222.10 1,004,136.73 705,730.29 1,003,040.90 0.53 10 705,353.41 1,003,681.64 704,890.53 1,003,477.18 Reserch 0.60 15 705,731.73 1,002,026.05 705,982.75 1,002,558.23 1.24 15 705,796.53 1,002,169.53 704,836.32 1,002,795.65 6.20 20 704,815.41 1,005,088.68 703,096.70 1,007,957.20 Gudina 2.54 15 704,754.37 1,002,732.91 703,357.29 1,000,699.48 Project Name Length (km) Muz tera –TTCQilisa Kebt tera-Chiro Wereda Office Sumeya BridgeAddis Ketema Agape 4 Starting Coordinate Agri Width Hotel- Center-TTC Agri 5 Reserch Center-ODA Bultu UniversityMain Asphalt Chiro 6 Town AdministrationMtichu-Leila 7 Hundi Engineering Works Consultant PLC. 3 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Road No. Estimated Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Starting Coordinate Ending Coordinate (m) X Y X Y 0.85 10 704,727.37 1,002,609.02 705,419.07 1,002,280.64 Blood Bank- Gende Kuteba 0.83 15 704,945.35 1,004,041.09 704,246.57 1,003,715.79 Wereda 10 705245.99 1004044.36 704908.248 1005522.819 Project Name Length (km) Width Scl-Nejebac Kidane Mihret Hundi 8 Gudina Scl-Aschalew Hotel 9 Bono Chiro 10 Office –Care 1.60 Ethiopia Total Length 21.66 Engineering Works Consultant PLC. 4 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Figure 1- 1: Location Map Engineering Works Consultant PLC. 5 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 2 REVIEW OF PREVIOUS STUDIES 2.1 Route Assessement 2.1.1 Route Identification Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 During route identification process, public consultations about the project and potential alternative routes have been conducted with Chiro town administrators. During the consultation and site assessment, we were able to identify the road segments. The proposed route segments are 10 grouped into three sections and are listed below, Table 2- 1: Road segments of the project Road No. Estimated Length (km) 6.04 Project Name 1 Muz tera –TTC-Qilisa Kebt tera-Chiro 2 1.22 Wereda Office Sumeya Bridge3 0. 51 Addis Ketema Agape Hotel-Agri 4 0.58 Reserch Center-TTC Agri Reserch CenterODA Bultu 5 1.23 University-Main Asphalt Chiro Town 6 Administration6.17 Mtichu-Leila Hundi Gudina Scl7 Nejebac Kidane 2.54 Mihret Hundi Gudina Scl8 0.86 Aschalew Hotel Blood Bank-Gende 9 0.83 Kuteba Bono Chiro Wereda Office 10 1.6 – Care Ethiopia Total Length 21.66 Table 2- 2: Road segment class Road No. Starting Coordinate X Y Ending Coordinate X Y 20 704,907.14 1,004,944.29 707,296.45 1,001,481.38 20 705,222.10 1,004,136.73 705,730.29 1,003,040.90 10 705,353.41 1,003,681.64 704,890.53 1,003,477.18 15 705,731.73 1,002,026.05 705,982.75 1,002,558.23 15 705,796.53 1,002,169.53 704,836.32 1,002,795.65 20 704,815.41 1,005,088.68 703,096.70 1,007,957.20 15 704,754.37 1,002,732.91 703,357.29 1,000,699.48 10 704,727.37 1,002,609.02 705,419.07 1,002,280.64 15 704,945.35 1,004,041.09 704,246.57 1,003,715.79 10 705245.996 1004044.36 704908.248 1005522.819 Width (m) Project Name Estimated Width Road Length (km) (m) Class 1 Muz tera –TTC-Qilisa 6.04 20 CS2 2 Kebt tera-Chiro Wereda Office 1.22 20 CS2 Engineering Works Consultant PLC. 6 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Road No. Project Name Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Estimated Width Road Length (km) (m) Class 3 Sumeya Bridge-Addis Ketema 0. 51 10 LS1 4 Agape Hotel-Agri Reserch Center-TTC 0.58 15 CS1 5 Agri Reserch Center-ODA Bultu University-Main Asphalt 1.23 15 CS1 6 Chiro Town Administration-Mtichu-Leila 6.17 20 CS2 7 Hundi Gudina Scl-Nejebac Kidane Mihret 2.54 15 CS1 8 Hundi Gudina Scl-Aschalew Hotel 0.86 10 LS1 9 Blood Bank-Gende Kuteba Bono 0.83 15 CS1 10 Chiro Wereda Office – Care Ethiopia 1.6 10 LS1 Total Length 21.66 Pictorially they can be shown as: Figure 2- 1: All the Project road segments of Chiro Town Internal Asphalt Road Project Engineering Works Consultant PLC. 7 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Figure 2- 2: Roads from Muz Tera to TTC, Kebt Tera to Aana Ciro, Sumayewu Bridge to Addis Ketema, Agape Hotel to Agricultural research institute then to TTC, Agricultural Research Institute to Odaa Bultum University, Chiro town administration to Madhicho No 2 School then Madhicho No.9 (Leyila), Hundi Gudina Scl-Nejebac Kidane Mihret, Hundi Gudina Scl-Aschalew Hotel, Blood Bank-Gende Kuteba Bono. Segment 1 Road Figure 2- 3: Roads from Muz Tera to TTC Engineering Works Consultant PLC. 8 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Segment 2 Road Segment 3 Figure 2- 4: Roads from Kebt Tera to Aana Ciro and Sumayewu Bridge to Addis Ketema Segment 5 Road Segment 4 Figure 2- 5: Roads from Agape Hotel to Agricultural research institute then to TTC and Agricultural Research Institute to Odaa Bultum University Engineering Works Consultant PLC. 9 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Segment - 6 Road Figure 2- 6: Roads from Chiro town administration to Madhicho No 2 School then Madhicho No.9 (Leyila) Segment - Segment -7 Figure 2- 7: Hundi Gudina Scl to Nejebac Kidane Mihret(S7) & Hundi Gudina Scl-Aschalew Hotel(S8) Engineering Works Consultant PLC. 10 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Segment -9 Road Figure 2- 8: Blood Bank to Gende Kuteba Bono(S9.1,S9.2,S9.3,S9.4,S9.5). Figure 2- 10 Chiro Wereda Office-Care Ethiopia Engineering Works Consultant PLC. 11 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Chiro is a town in eastern Ethiopia. It is the administrative center of the West Hararghe Zone in Oromia Regional State. Located in the West Hararghe Zone in Oromia Regional State, Ethiopia. Surrounded by Chiro rural Wereda s’ kebele. It has a latitude and longitude of 9°05′N 40°52′E and an altitude of 1812-1840 meters’ elevation. It was found necessary to repair, expand and maintain of Oromia region’s road network to improve transport operating efficiency and reduce road transport costs, provide access to rural, neglected and food deficit area and develop institutional capacity of the sector. ORLB, as it is the authority responsible for the construction and administration of roads within the Oromia Region and as part of the Region Administration, took the responsibility of working on the roads within and in the vicinity of the project area to respond to the expected demand. Current condition of the project Road segments has been assessed during the reconnaissance site visit and the following has been noted: Roads from Muz Tera to TTC, Kebt Tera to Aana Ciro, Sumayewu Bridge to Addis Ketema, Agape Hotel to Agricultural research institute then to TTC, Agricultural Research Institute to Odaa Bultum University, Chiro town administration to Madhicho No 2 School then Madhicho No.9 (Leyila). Muz Tera to TTC The alignment starts at an intersection of Addis Ababa - Diredaw asphalt road on the Left side when travelling from Addis to Diredaw and there is an existing road some length of it is Coblstone and the rest length it is an earthen road. The excising road way width is not enough for the recommended width on the master plan of the town therefore there will be ROW issue during implementation. The Road crosses Sumayewu River after it goes 400m. Bajaje, Isuzu and Small Vehicles are main means of transport at this specific road segment. The route passes though rolling and mountainous topography. Kebt Tera to Aana Chiro The alignment starts at an intersection of Chiro Inter main asphalt 2 road on the Left side when travelling from Addis to Diredaw and end by creating an intersection on Muz Tera to TTC and there is an existing road some length of it is Coblstone and the rest length it is an earthen road. The land use along the route is mixed residence for a short distance from the beginning and after then it is mainly residential. The excising road way width is not enough for the recommended width on the master plan of the town therefore there will be ROW issue during implementation. The Road crosses Sumayewu River after it goes 200m.Bajaje is the only means of transport due to incapability of the existing bridge condition at this specific road segment. Engineering Works Consultant PLC. 12 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 The route passes though rolling topography. Sumayewu Bridge to Addis Ketema The alignment starts at an intersection of Kebt Tera to Aana Chiro asphalt road around 480m on the right side when travelling from Aana Chiro to Kebt Tera. The route has an existing Coble stone road throughout its length which goes on the proposed road corridor. The existing route cross Sumayewu River after it goes 100m. The land use along the route is mixed residence for a short distance from the beginning and after then it is mainly residential. The existing road way width is wide enough for the recommended width on the master plan of the town, Hence, big ROW issue is not expected. Bajaje, Isuzu and Small Vehicles are main means of transport at this specific road segment up to Sumayewu river. This route passes through flat to rolling topography. Agape Hotel to Agricultural research institute to TTC The alignment starts at an intersection of Addis Ababa - Dire Dawa asphalt road on the Left side when travelling from Addis to Dire Dawa and The route has an existing Coblstone road throughout its length which goes on the proposed road corridor. The land use along the route is mixed residence for a short distance from the beginning and after then it is mainly residential. The existing road way width is wide enough for the recommended width on the master plan of the town. Hence, big ROW issue is not expected. Bajaje, Isuzu and Small Vehicles are main means of transport at this specific road segment. This route passes through flat to rolling topography. Agricultural Research Institute to Odaa Bultum University The alignment starts at an intersection of Agape Hotel to Agricultural research institute to TTC road around 200m on the left side when travelling from Agape Hotel to Agricultural research institute to TTC road. The route has an existing Cobblestone road throughout its length which goes on the proposed road corridor. The land use along the route is mixed residence for a short distance from the beginning and after then it is mainly residential. The existing road way width is wide enough for the recommended width on the master plan of the town. Hence, big ROW issue is not expected. Bajaje, Isuzu and Small Vehicles are main means of transport at this specific road segment. This route passes through flat to rolling topography. Chiro town administration to Madhicho No 2 School then Madhicho No.9 (Leyila). Engineering Works Consultant PLC. 13 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 The alignment starts at an intersection of Addis Ababa - Dire Dawa asphalt road on the Right side when travelling from Addis to Dire Dawa and there is an earthen existing road. The excising road way width is not enough for the recommended width on the master plan of the town therefore there will be ROW issue during implementation. Bajaje, Isuzu and Small Vehicles are main means of transport at this specific road to half of the segment. The route passes though rolling and mountainous topography. Hundi Gudina Scl to Nejebac Kidane Mihret The alignment starts at an intersection of Addis Ababa - Dire Dawa asphalt road on the Right side when travelling from Addis to Dire Dawa and there is an earthen existing road. The excising road way width is not enough for the recommended width on the master plan of the town therefore there will be ROW issue during implementation. Bajaje, Isuzu and Small Vehicles are main means of transport at this specific road segment. The route passes though rolling topography. Hundi Gudina Scl-Aschalew Hotel. The alignment starts at an intersection of Hundi Gudina Scl to Nejebac Kidane Mihret road around 120m on the Right side when travelling from Hundi Gudina Scl to Nejebac Kidane Mihret road. The route has an existing earthen road throughout its length which goes on the proposed road corridor. The land use along the route is mixed residence for a short distance from the beginning and after then it is mainly residential. The excising road way width is not enough for the recommended width on the master plan of the town therefore there will be ROW issue during implementation. Bajaje, Isuzu and Small Vehicles are main means of transport at this specific road segment. The route passes though rolling topography. Blood Bank to Gende Kuteba Bono. The alignment starts at an intersection of Addis Ababa - Dire Dawa asphalt road on the Right side when travelling from Addis to Dire Dawa and there is an earthen existing road. The excising road way width is not enough for the recommended width on the master plan of the town therefore there will be ROW issue during implementation. Bajaje, Isuzu and Small Vehicles are main means of transport at this specific road segment. The route passes though rolling and mountainous topography. Chiro Wereda Office-Care Ethiopia The alignment starts at an intersection of Kebt Tera-Ana Chiro road around 1+140m on the Right side when travelling from Kebt Tera to Ana Chiro road. The route has an existing Coble stone road throughout its length which goes on the proposed road corridor. Engineering Works Consultant PLC. 14 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 The land use along the route is mixed residential and commercial center. The excising road way width is enough for the recommended width on the master plan of the town therefore there no ROW issue during implementation. Bajaje, Isuzu and Small Vehicles are main means of transport at this specific road segment. The route passes though rolling topography Engineering Works Consultant PLC. 15 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 3 TOPOGRAPHICAL SURVEY 3.1 Introduction Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Topographic survey is one of the most important and crucial field tasks that form the base data for the project design. The topographic survey is basic pre - requisite to capture all the physical futures along the project corridor to enable the selection of feasible and most useful alignment and later to design and to facilitate the establishment of final centreline of the project road and land acquisition requirements. The topographic survey work methodology consists of following main tasks. Establishment of geodetic control points using the most important technological advance in surveying that is the Global Positioning System (GPS) Setting up of permanent beacons to serve as a reference system during road design and construction Development of control traverse-line and geometric level-line. Detailed field survey using electronic Theodolite with EDM (Total Stations) and digital Levels, which will have a different precision according to the topographic operations. Data Processing and CAD; Development of Land acquisition plan; and Delivery of survey Report including Diagrams and Monographs Ground surface and Structural location survey For carrying the survey work the consultant approached EMA (Ethiopian Mapping Authority) and collected EMA control points within the Project Corridor and deployed high and precision instruments like GPS, Total station, and Auto level in compliance to the TOR. 3.2 Mobilization of Surveyors and Equipment’s The survey instrument used in this project and their accuracy are mentioned below. Table 3- 1: List of Survey instruments S/No 1 2 Survey Instrument Ground positioning system instruments Total Station Model/ make No Promark Three Degree of Accuracy Magellan navigation system Thales GPS system receiver sets Static Mode with at least 8 satellites tracking per site (5 mm + 0.5ppm) Sokkia Set 310, Nikon, Topcon 2’’ and 3’’ With a maximum tolerance in mm 3 Level Sokkia for single section equal to: 10K, where is the distance in km. In order to achieve the required output within time the limit, the consultant deployed three teams. Engineering Works Consultant PLC. 16 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 3- 2: List personnel’s (team 1: GPS team) No Name of staff Job Title Position on the Project 1 Yonas Tegegne S.Surveyor Coordinator/ Surveying Team leader S.Surveyor Surveyor 2 Table 3- 3: List personnel’s (team 2: Control traverse survey& Topographic Survey) No Name of staff Job Title Position On the Project 1 Abenezer Buche S.Surveyor Senior Surveyor (Team Leader) 2 Wendifraw S.Surveyor Senior Surveyor 3 Semahegn Solomon S.Surveyor Senior Surveyor 3.3 Data Collection Data collection is the first stage of topography surveying which has been conducted in two stages, Desk study and Site reconnaissance. During desk study relevant information have been collected from topographical maps, satellite imageries, Google earth maps and GPS Control point information have been collected from Ethiopian Mapping Agency. The list of data collected and used in each category includes: a) 1:50,000 scale topographic mosaic map of Ethiopia b) 12.5mX12.5M DEM Grid data- Shuttle Radar Topography Mission (SRTM) data c) List of National GPS control points No Point Name Easting Northing Height Zone 1 ASB1 685234.239 1013753.559 1491.333 37 2 MIESO(ETMI) 692840.904 1020511.073 1329.828 37 3.4 Scope of Topographic Survey The scope and methodology of the topographic surveying works conducted in the specified sections mainly includes Collection of data for route selection, route location and detail topographic surveying on the field. Route location and marking of the preferred route on the field. Establishing GPS points at every 5km interval of the road and tying it to the National Grid System. Installation of permanent benchmarks at a maximum of 100m to 300m intervals. Levelling of the control points with automatic level instruments Carrying out detailed cross-section survey at every 20m interval or lesser and with a band width varying between 50 to 100m and beyond, depending on the terrain conditions, to the left and right of the approximate centre line of road Engineering Works Consultant PLC. 17 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Carrying out detail surveying at the bridge locations Gathering all the information required for the land acquisition related to the project Generating a terrain model from the survey data and using the terrain model for the detailed engineering design of the road 3.5 GPS Surveying Methodology 3.5.1 Establishment of Geodetic Control Points Using Global Positioning System (GPS) Global positioning system (GPS) observations were determined within approximately about 4.0 KMs interval along the road length. The geodetic GPS points were placed in highly accessible sites with appropriate bench marks protected against impact to guaranty their stability and integrity. The established GPS points are couple and inter visible to each other at a minimum distance of 50m and were tied with national coordinates system found within the vicinity of the project road. The GPS points are painted yellow and the description is marked in red. 3.5.2 Tying with National Coordinate System Generally, the project passes through Zone 37 and to secure and validate a reasonable initial new control points have been automatically tied to the national grid system in Zone 37, reference point Adindan (30th meridian) datum. The coordinate system used for the project is the Ethiopian National Grid System (Clarke 1880 modified spheroid, U.T.M Grid Adindan Datum). 3.5.3 Coordinate System The coordinate system used for the project is the Ethiopian National Grid System (Clarke 1880 modified spheroid, U.T.M Grid Adindan Datum). The design survey control points shall be checked and correlated in to the National Grid system by transforming in to UTM projection system and local datum reference- Adindan datum. 3.5.4 Verification of Positioning The positions of the GPS points were checked with the National coordinates. 3.5.5 Data Processing and Mapping We made widespread use of computerized system whilst carrying out investigation and survey activities. This permits an easier, more efficient and rapid management and guarantees a continuous control of all activities and aspects of the work. Using highly post- processing GNSS Solutions software, the WGS84 co-ordinates has been transformed into the national grid, U.T.M. co-ordinates based on Clark 1880 (Modified) spheroid – Datum: Adindan. Engineering Works Consultant PLC. 18 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Transformation parameters Coordinate system Name: ETHIOPIA ZONE 37 Type: projected Unit name: meters Vertical datum: EGM 2008 Vertical unit: meters Datum Name: ADINDAN 37 Ellipsoid name: CLARKE 1880 mod Semi-major axis: 6378249.145 m Inverse flattening: 293.466307674 Dx to wgs84: 162.000 m Dy to wgs84: 12.000 m Dz to wgs84: -206.000 m Projection Projection class: Transverse Mercator Latitude of origin 0° 00' 00.00000"n Central meridian 39° 00' 00.00000"e Scale factor 0.999600000000 False easting 500000.000 m False northing 0.000 m 3.6 Benchmark Setup Benchmark (secondary control points) referenced in the field on reliable points on appropriate bench mark beacons protected against impact to guaranty their stability and integrity. These benchmarks established at intervals of approximately 100m to 300 m. The vertical controls of the bench marks were established using differential levelling procedure. The differences in elevation between consecutive benchmarks / GPS points are determined which are used to extend elevation from the first GPS point elevation to all other benchmarks and GPS points. 3.6.1 Control Traverse-Line A traverse surveying is usually employed in all forms of legal and engineering works to compute Easting and Northing positions for networks of benchmarks extended from GPS points. Essentially, traverses are a series of established survey stations that are tied together by angles and distances measured and recorded using electronic total stations between each vertex by beginning on twin GPS points and closing on the next twin GPS points. Engineering Works Consultant PLC. 19 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 The accuracy of traverse surveying is Allowable angular accuracy = √ (N+1) * 30” Allowable Linear accuracy 1:10,000 The angle and distance measurements are reduced into Easting and Northing coordinates using standard traverse computations procedures. 3.6.2 Geometric Level-Line The elevations of the consecutive Bench marks are transformed by direct differential levelling starting from the elevation of the first GPS point elevation using levelling instrument. Levels for each consecutive bench marks are determined by forward and a subsequent backward run forming a closed loop. Levels for each control points are computed using standard differential levelling computation. For this reason, the elevations of GPS points listed on the differential levelling overrides the list on the GPS Monograph. The accuracy of level (Z) is: Z = 10 mm x √K 3.7 Where (K being the survey distance in km between control points). Collection of Cross-section Data The topographical survey is the backbone of a detailed engineering design. Accuracy of the information collected during this survey has a direct impact on almost all the design activities involved in the project. This study involves location of control points, construction and fixing of co-ordinates and documentation of monuments. Topography surveys are performed in order to determine the position of all natural and manmade features within the road corridor. The topography surveying has been carried out with a minimum of 100m band width (50m to the left and 50m to the right from the centre of the road) varying up to 300m band width and a maximum staking interval of 20m. Where there is a high cross slope, the band width is increased in order to provide design flexibility and accommodate the design cross section. The survey included the determination of the coordinates of points located: on the existing road centreline at the road edges at the toe line of the fill and cut sections Engineering Works Consultant PLC. 20 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 break lines and points on Culverts and Bridges high water marks break lines and points along longitudinal section of rivers 100 m either side in the case of minor bridges and 500 m either in the case major bridges cross section of rivers features on intersections and side roads up to a length of 50m features showing service lines buildings places of social or traditional importance 3.8 Data Processing and CADD The consultant uses computerized system whilst carrying out investigation and survey activities. This permits an easier, more efficient and rapid management and guarantees a continuous control of all activities and aspects of the work. Specific programs are used to transfer and process field data into computers. Computer programs such as AutoCAD are used for preparation of drawings and graphics, using software modules that operate inside AutoCAD that are specifically designed for maps and for road projects. The electronic field books and other topographic data are placed in ASCII and / or DXF formats or MS Excel files. Engineering Works Consultant PLC. 21 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 4 HYDROLOGICAL AND HYDRAULIC STUDY 4.1 Project Description Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Chiro is a town in eastern Ethiopia. It is the administrative center of the West Hararghe Zone in Oromia Regional State. Located in the West Hararghe Zone in Oromia Regional State, Ethiopia. Surrounded by Chiro rural Weredas’ kebele. It has a latitude and longitude of 9°05′N 40°52′E and an altitude of 1812-1840 meters’ elevation. It was found necessary to repair, expand and maintain of Oromia region’s road network to improve transport operating efficiency and reduce road transport costs, provide access to rural, neglected and food deficit area and develop institutional capacity of the sector. ORLB, as it is the authority responsible for the construction and administration of roads within the Oromia Region and as part of the Region Administration, took the responsibility of working on the roads within and in the vicinity of the project area to respond to the expected demand. Scope of Hydrology and Hydraulics Report The Oromia Roads & Logistics Bureau proposes to carry out Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project from which this hydrology/Hydraulics study main scope and purposes are from which this hydrology/Hydraulics study main scope and purposes are: To describe the design criteria and the design assumption used for the design of drainage structures To describe the existing structures condition To give detail description of the hydrological study and hydraulic analyses and computations made in the analysis, To provide a schedule that show the design discharge that must be pass under the road due to expected floods, To provide a schedule that shows the drainage, size, and recommendations for specific drainage related problems To give detail description of hydrological study, hydraulic analysis, computation and evaluation of peak discharge of mention projects, evaluating and determining the type/size of existing and proposed structure, safety of the drainage facilities needed for the proposed alternative crossing sites and to provide hydraulic recommendations in compliance with ERA DDM, 2013 manual guidelines and procedures. This report is divided into seven sections including this introductory section. The second chapter presents design standard of structures and methodology. The third chapter presents data collected Engineering Works Consultant PLC. 22 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 for the study, climatic condition of the project area, drainage condition, and land use and soil type of the watershed area of the projects. The fourth chapter presents hydrological study, topographic map, soil type, data collected from site and data acquired from different organizations and manuals. In this project the design flood is estimated focus on Rational and SCS method depend on the catchment size as per recommendation of ERADDM 2013. The fifth chapter deals with hydraulic design of road projects with considering Economy and sustainable drainage opening that suite the site conditions are proposed using appropriate hydraulic computation as per the manual recommendation. Hydraulic tool box, Hy-8 and HEC-RAS hydrodynamics software is used for the hydraulic analysis of longitudinal ditch, crossing culverts, and Bridge opening sizing, and determination respectively. The sixth chapter discusses conclusions and recommendations, while the final part, chapter seven, presents the hydrology/hydraulics analysis in annex summary format. 4.2 4.2.1 Methodology and Standards General The ultimate goal of highway drainage design is to convey surface and stream waters originating on the road surface and upstream of the drainage facility to the downstream side without causing objectionable backwater, excessive flow velocities, excessive scour, or unduly affecting traffic safety. Prior to the hydraulic design of a culvert or bridge, the design discharge, the quantity (Q) of water in cubic meters per second that the facility may reasonably be expected to convey must be estimated. Many hydrological guidelines recommend using peak floods for highway drainage structures. So, the peak flood is estimated for the purpose of designing the highway drainage structures. This Design report was commenced by the ERADDEM 2013 manual even though the Hydrologist/Hydraulic Engineer, additional detailed desk work for the road alignments using satellite imageries, 1: 50,000 Topographic maps, DEM, integrating the desk work with a detailed site visit and investigation of the site and supplemented by close consultation with the stakeholders. 4.2.2 Methodology The method adopted for the design of flood computation and hydraulic analysis and design are discussed briefly under this section. The study has been started by data collection, and then interpreting and analysing the data. The result of the analysis is used for determination of design discharge and design of drainage structures. To conduct a hydrological study and hydraulic design of the project, the activities listed below were performed: Engineering Works Consultant PLC. 23 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 All available data which are useful for hydrological study and hydraulic design were collected and analyzed; Study on topographic maps: Watershed area delineation & determination of the catchments area, stream lines length using available topographic maps, high degree resolution( 12.5m by 12.5m) DEM and satellite images; ARC-GIS with arc-hydro tool software version 10.7 is used to delineate catchment area. Globar Mapper 23 is used to determine all catchment characteristics of the watershed area of the Bridge site. Soil map and land use/cover map of the drainage areas for estimatation rainfall-runoff characteristics of the watershed area runoff curve number are prepared; ARCGIS 10.7 is used to analysis the soil map and landuse/cover map for the delinated wateshed areas. Field investigation was conducted to collect data on catchments characteristics, flow pattern, possible location for alternative crossing of the bridges, characteristics at upstream or downstream side and observed high flood marks around the crossing;. Estimation of design discharge for different return period using rainfall-runoff model based on sizes of the catchments and availability of data as per the recommendation of the manuals; A brief summary for the size, number, and catchment characteristics of the drainage facilities. 4.2.3 Design Standards /Frequency Design Frequency or return period is indicative of the frequency with which a certain magnitude of rainfall/runoff occurs in that period. The number of times a flood of a given magnitude can be expected to occur on average over a long period of time. Design frequency can be expressed with probability. The probability of being equal or exceeded in any year can be defined by the following expression. P( X X T ) 1 T Where: P = Frequency Exceedance Occurrence of design flood exceeded or equal once (Return period), in years Since it is not economically feasible to design a structure for the maximum runoff a watershed is capable of producing, a design frequency must be established according to the cost, potential flood hazard to property, expected level of service, political considerations, and budgetary constraints, and considering the magnitude and risk associated with damages from inundation. Engineering Works Consultant PLC. 24 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 The road is classified as DC5 according to the Geometric Design Standard and this governs the design storm frequency period of cross and side drainage structures. The ERA Drainage Design Manual (ERADDM-2013) recommends the design frequency as shown in table 2-1 for DC5 roads. The recurrence interval values shown in the table below are used for hydraulic design of drainage facilities. Table 4- 1:: Return Periods Considered (ERA Drainage Design Manual 2013) Design Flood Return Period (Years) Type of Structure Check Review Flood (Years) Artesian Road Drains in Residential Areas, Gutters and Inlets 2 5 Side Drains and Ditches 5 10 Culvert, Pipe Span <2 m 10 25 Culvert, 2m <Span < 6 m 25 50 Short Span Bridge, 6m < Span < 15 m 25 50 Medium Span Bridge, 15 < Span < 50 m 50 100 Long Span Bridge, Spans > 50 m 100 200 4.2.4 Methods of Design Flood Computation As per ERA DDM recommendations (Chapter nº5), the methods used in determining peak flood magnitudes for design of road drainage structures are rational method for catchments with an area less than or equal to 0.5 km2 and Soil Conservation Services (SCS) unit hydrograph method for catchments with an area greater than 0.5 km2 and greater than 65 km2 Table 4- 2: Flood estimation methods (Table 5-3 of ERA DDM). Engineering Works Consultant PLC. 25 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 As Per the watershed area for the project area both applied the rational and SCS method were used for design flood computation. The basic principles of the methods are discussed in chapter four. Design Limitation The study was carried out using all possible available data sources. However, some of the data are limited to perform detail hydrological and hydraulic analysis which considers the entire watershed in the modelling. High resolution and latest soil type and land cover/ land use map are not available 4.3 Data Collection and Analysis Following ERA DDM for Hydrologic/Hydraulic Analysis and Design, the Consultant collected all relevant data required for the implementation of the design service around the project sites. These data included but not limited to Climatic Data and Mapping & Aerial photography. As part of planning and design, several categories of data are collected and evaluated, including: Physical characteristics of drainage basins, Maps and topographic data including channel surveys and cross sections, Collection of Rainfall Data from NMSA, Upstream constraints on headwater elevation, Vegetation cover, Channel and flood plain delineation and related studies, Engineering Works Consultant PLC. 26 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Consideration of multipurpose opportunities and constraints, benefit/cost analysis and evaluation. 4.3.1 Data Collection While dealing with the hydrologic and hydraulic design of any road/ bridge project it is very important to outline the type of data, possible data sources, and aspect of the data collection that are normally required for drainage analysis and design. Topographic maps, soil data and land use/ cover were collected for further the hydrological study and comparison with actual observation. The data collected for the study as follow: Daily highest rainfall and mean monthly rainfall records of different stations around the project area, which is acquired from Ethiopian meteorological agency. Long term monthly maximum and minimum temperature of different stations around the project area, which is acquired from Ethiopian meteorological agency. From Ethiopian mapping Agency (EMA), topographic map of scale 1: 250,000 Digital Elevation Model (DEM) of the project area (12.50m by 12.50m resolution) Geomorphology/soil maps of the project area Land use/cover of the project area. Previous rainfall data analysis and study for the subject road project if any. Detailed condition survey of drainage characteristics and existing structures if any. Plan-Profile of the road project based on Topographic survey. Topographic survey data of the of the bridge crossing locations 4.4 Previous Studies, Existing Data and Maps 4.4.1 Data and documents All available data encompassing metrological, land cover, soil and topographic data has been collected from different sources and reviewed in characterizing the drainage feature of project under consideration. Review and realization of, employer’s requirement and related documents has been also made. Digital elevation model of 12.5m resolution has been used to characterize the project corridor with respect to drainage along with 50,000 scale topographic map produced by Ethiopian mapping Agency. Apart from digital elevation model, recent Google images of good resolution obtained from online free sources (Google earth) and satellite images used to refine the drainage analysis. Above all stated data, onsite stretch based physical drainage survey and local people consultation provided a detail information about the prevailing drainage condition of the road. Climate data from the Asebe-Teferi stations has been collected and analyzed to characterize the area in terms of climate. Engineering Works Consultant PLC. 27 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 4- 3: Physiographic and climate data S/N Data Type Lat. Long. 1 12.5 m resolution DEM 9 41 Remark Obtained from free Landsat online source 2 Topographic map 3 Metrological data 9 41 50,000 scale sheets (RF)& Asebe Teferi Stations Temperature 4 Land use/cover & soil data Google/ Satellite image 1:1,000,0000 Scale 9 41 From free online sources with 5 20m /75yard resolution 4.4.2 Existing Conditions General Minor and major defined streams crossing structures exist with poor and good hydraulic performance have been built on the road where some minor and major crossing Structure recommended to be replaced by new structure. The number of medium and major rivers flows across the route are considerably in number and there are several minor and major structures are Propose. Existing Bridge in Kebte tera to chiro wereda Engineering Works Consultant PLC. Existing Triple Pipe in Hundi Gudina Scl Nejebac K/ Mihret 28 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Slab Culvert in Chiro Town Administration to mitichu Leila Bridge in Sumeya Bridge to Addis Ketema Masonry Ditch in Muztera Tcc Figure 4- 1: Existing Condition of Major and minor Cross Drainage Structures Field Data A field survey or site investigation should always be conducted except for the most preliminary analysis or trivial designs. Hence the field survey is one of the primary sources of hydrologic data. In the first stage, the team of different professionals carried out a reconnaissance survey in which general drainage pattern and catchment characteristics were observed in order to prepare a detailed investigation survey program. The project road alignments cross a number of minor crossing and some number of major drainage crossings. There are minor drainages found in the project road and recommended structures are pipe culverts with different arrangement in number and slab culverts. 4.4.3 Hydro-Climatic Data 4.4.4 Climate Engineering Works Consultant PLC. 29 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Climate is influenced by latitude, altitude, land and water surfaces, mountain barriers, local topography, and such atmospheric features as prevailing winds, air masses and pressure centers. Although Ethiopia is located in the tropics, temperatures vary greatly with altitude and large climate variation, from hot arid to cool temperate, exist in the country. Generally, the adiabatic lapse rate is about 6oc decrease per 100 m altitude increase. Based on climatic classifications of Ethiopia, the vicinity of the project area can be grouped under W Dega climate condition. Figure 4- 2: Climatic Zones of the Project Area 4.4.5 Rainfall Data Monthly rainfall data is used to demonstrate the rainfall pattern in & around the project areas. Thus, the data for several years were collected and analyzed to demonstrate the variation of rainfall prevalence in the area. Table 4- 4: Monthly Highest Rainfall Data Month Monthly Mean RF Jan Feb Mar 12.3 14.9 73.5 April 109 .9 May Jun July Aug Sep Oct Nov Dec 105.4 62.6 129.1 182.5 133.2 43.1 17.4 19.4 Engineering Works Consultant PLC. 30 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Figure 3.6 maximum monthly rainfall data Figure 4- 3: Mean Monthly Rainfall of Asebe Teferi 4.4.6 Frequency Analysis The objective of frequency analysis of hydrologic data is to relate the magnitude of extreme events to their frequency of occurrence through the use of probability distributions of Gumble EV I, LogPearson Type III, Log-Normal, Normal Distribution and Pearson Type II. The hydrologic data analyzed are assumed to be independent and identically distributed, and the hydrologic system producing them (e.g., a storm rainfall system) is considered to be stochastic, space-independent, and time-independent in the classification scheme 18 years of rainfall data were collected from national meteorological service Agency at Asebe-teferi station, based on the above methods the collected data were analyzed. The frequency analysis result was compared with ERADDM recommendation of Rainfall region A4 and Regional Value it’s higher than the ERADDM.The peak flood estimation were computed by using the rainfall depth of the frequency analysis result obtained. Recommendation of Asebe Teferi Metrological analysis for the specified return periods. Based on the obtained meteorological data’s frequency analysis were done and the obtained result were presented in table below Table 4- 5: 24hr Rainfall Depth Vs Frequency Engineering Works Consultant PLC. 31 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Figure 4- 4: From NMA, IDF Curve of Asebe Teferi metrological analysis The Watershed area for all streams crossing of the project has been delineated from 12.5mx12.5m resolution digital elevation model through ARC-GIS with Arc-Hydro tool. Stream channel length, slope and time of concentration have been derived from delineated watershed area for each crossing under consideration. 4.4.7 Catchment area Delineation Engineering Works Consultant PLC. 32 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 The study of the watershed characteristics extensively studied using site investigation and topographic maps, (Data regarding catchment areas) i.e. watershed size and shape, stream slope, stream length and land slope were determined from topographic map scale 1: 50,000 and satellite data DEM 12.5mx12.5m resolution. The catchment areas of each watershed on the whole route corridor were delineated from DEM data of 12.5mx12.5m resolution and topographic map 1: 50,000. The sizes of each catchment area were determined using Arc GIS software. Figure 4- 5: Preliminary Delineated Watershed Area 4.4.8 Hydrologic Soil Type The soil types of the watershed areas are examined in this section to classify the soil with respect to infiltration and runoff i.e. to determine the runoff coefficient or curve number of catchments areas. The soil types of the catchments area are determined from site visit as well as geomorphology and soil maps of the project area. Soil type of the drainage areas have different rate of infiltration. Based on infiltration rates, the soil conservation service (SCS) has divided soil into four hydrologic soil groups as follows: Group A: Soil with a low runoff potential due to high infiltration rates. Group B: Soil with moderately low runoff potential due to moderate infiltration rates. Engineering Works Consultant PLC. 33 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Group C: Soil with moderately high runoff potential due to slow infiltration rates. Group D: Soils with a high runoff potential due to very slow infiltration rates. The soil types of the watershed areas are examined in this section to classify the soil with respect to infiltration and runoff i.e., to determine the runoff coefficient or curve number of catchments areas. The soil types of the catchments area are determined from site visit as well as geomorphology and soil maps of the project area. The soil type and thickness in the project area is a function of geology, geomorphology and climate and the hydrologic soil grouping is classified by the Ministry of Water Resources Metadata Bases (Shape files). The Hydrologic soil grouping for each catchment is identified from examination of available soil maps and physical assessment done on site. Accordingly, as per ERADDM2013 and from soil map the project area catchment area is 100% HSG under B which indicates moderately runoff potential due to moderately infiltration rate. Figure 4- 6: Hydrologic Soil Group Map of the Project Area 4.4.9 Vegetation and Land Use Land use and land cover for each catchment is identified from examination of available Land Use and Land Cover maps, land use shape files and physical assessment done on site. Based on the obtained data’s more throughout the project route the land cover was Urban and Cultivation and Managed area Engineering Works Consultant PLC. 34 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Figure 4- 7: Land use/Cover of the Road Project Area 4.5 Hydrological Study 4.5.1 General The hydrological study was undertaken in order to compute and evaluate peak discharges for all watercourses crossing the project road. Calculation of these peak discharge values enabled the determination of the hydraulic opening sizes and types of waterways required. There are many methods developed for calculation of the design flood but their applicability depends mainly on the availability of hydrological data. As most of the methods have parameters which depends on climate and morphological condition. The climate data (rainfall and intensity) and morphological condition of the project area were collected and investigated to determine inputs data for the methods of flood calculation like runoff coefficient, curve number, design point rainfall and rainfall intensity of the project. The hydrological analysis was undertaken using available maps and digital terrain model together with the data acquired from Meteorological Services Agency. Additional hydrological and geological information has been gathered from site visits and different sources. Rational formula and U.S. Soil Conservation Services (SCS) Unit hydrograph method were adopted to compute the design discharge depending on the size of catchments area and availability of stream flow data as per ERA Drainage Design Manual (ERADDM-2013) recommendation. Engineering Works Consultant PLC. 35 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 4.5.2 Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Methods of Peak Flood Computations Any hydraulic structure of road crossing should be designed in such a way that any extreme event of peak discharge should pass safely. Hence for this particular project the hydrologic design is carried out according to ERA Drainage Design Manual, (ERA DDM 2013) given on the employer’s requirement of the subject road project. Salient features are reproduced herein. There are many methods developed for calculation of the design flood but their applicability depends mainly on the availability of hydrological data. As most of the methods have parameters which depends on climate and morphological condition. The climate data (rainfall and intensity) and geo-morphological condition of the project area were collected as it was cited in previous section and investigated to determine inputs data for the methods of flood calculation like runoff coefficient, curve number, design point rainfall and rainfall intensity of the project. Rational formula and U.S. Soil Conservation Services (SCS) Unit hydrograph method is the most widely used and standard method adopted by ERA for smaller to medium catchment size. The basic principles of the methods are discussed briefly in the following subsections. 4.5.3 Rational Method The rational methods of estimating design flood on small watershed is based, in concept, on the criterion that storms of uniform intensity distributed evenly over the basin, maximum rate of runoff equal to a certain percentage of rainfall intensity occurs when the entire basin area is contributing at the outlet. This condition met after the elapsed time tc, time of concentration. The equation of rational formula is function of Catchment area, runoff coefficient and time of concentration. The equation is expressed as: Qd = 0.278 C Cf I A Where: Qd = Design Discharge in m3/sec Cf = Frequency factor C = Runoff Coefficient A = Drainage area (Km2) I = Rainfall Intensity for duration equal to time of concentration This method is adopted for catchments area up to 0.50km2. The parameters which are used in the computation of design flood using rational formula are discussed as follows. i. Runoff Coefficient & Frequency Factors Runoff coefficient of the catchment area depends on slope/terrain characteristics, permeability of the soil and land use/cover of catchments area. It is influenced by many variables, and does not remain constant during the design life of the structure. Engineering Works Consultant PLC. 36 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 4- 6: Derived Run-off Coefficients (C) Factor Average Cs Run-off Description Coefficient < 3.5% (flat) 0.05 3.5% - 10% (Flat to moderate) 0.10 of 10% - 25% (Rolling) 25% - 45% (Hilly) catchment 0.15 >45% (Mountainous) 0.25 Well drained soil (e.g., sand and gravel) 0.05 slope 0.20 Fairly drained soil (e.g., sand and gravel with 0.10 fines) Cp 0.15 Permeability Poorly drained soil (e.g., silt) of soil 0.25 Impervious soil (e.g., clay, organic silts and 0.50 clay) 0.40 Water-logged black cotton soil Rock Cv Dense forest/thick bush 0.05 Spares forest/dense grass 0.10 Ground Grassland/scrub 0.15 type/cover Cultivation 0.20 Sparse grassland 0.25 Barren 0.30 C = Cs + Cp + Cv Table 4- 7: Run-off Coefficient (C) as per ERA Drainage Design Manual 2002) Terrain Type Soil Type A B C D Flat, < 2% 0.04-0.09 0.07-0.12 0.11-0.16 0.15-0.20 Rolling, 2-6% 0.09-0.14 0.12-0.17 0.16-0.21 0.20-0.25 Mountain, 6-15% 0.13-0.18 0.18-0.24 0.23-0.31 0.28-0.38 Escarpment, >15% 0.18-0.22 0.24-0.30 0.30-0.40 0.38-0.48 The Rational equation given above is applicable for return periods of 5 to 10 years. For less frequent flood computations, the rational equation should be multiplied by factors. Table 4- 8: Frequency factor, Cf Engineering Works Consultant PLC. 37 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Return Period Cf 5 1.00 10 1.00 25 1.10 50 1.20 100 1.25 Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Sources: ERADDM-2013 ii. Rainfall Intensity 18 years Daily rainfall data from Asebe Teferi station have been collected and analyzed using five distribution methods for design storm and IDF curve development. Computed design rainfall values found to be very close to the regional design rainfall values., however, apart from discontinuities in rainfall records largely observed on the collected data that will make the analysis less reliable, short duration rainfall records that can be readily used for IDF development not obtained for the stations under considerations and only daily rainfall data used with generalized coefficients developed on regional context making the analysis course enough. With this ground, regional design rainfall value and IDF curve which better represent the actual flood condition of the area has been considered to undertake hydrological analysis of the project road. Time of Concentration Time of concentration is the time required for water to flow from hydraulically remote point of catchments area to the point under investigation. The most intense rainfall that contributes at drainage structures crossing will be that the duration equal to the time of concentration. Calculation of the Time of Concentration for Overland Flow: Overland flow is the type of flow that occurs in small, flat or in upper reaches of catchments, where there is no clearly defined watercourse. Run-off, then, is in the form of thin layers of water flowing slowly over the fairly uneven ground surface. The kerby formula is recommended for the calculation of Tc in this case. It is only applicable to parts where the slope is fairly even. Tc=0.604(rL/S0.5)0.467 Where: Tc = time of concentration (hours) r = roughness coefficient obtained from Table 4-5 L = hydraulic length of catchment, measured along flow path from the Catchment boundary to the point where the flood needs to be Determined (km) S = Slope of the catchment S=H/1000L (m/m) H= Height of most remote point above outlet of catchment (m) Engineering Works Consultant PLC. 38 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Calculation of Time of Concentration for Defined Watercourses In a defined watercourse, channel flow occurs. The recommended empirical formula for Calculating the time of concentration in natural channels was developed by the US Soil Conservation Service: Tc= (0.87L2 /1000 Sav) 0.385 Where: Tc= time of concentration (hours) r = roughness coefficient obtained from Table 1-11 L = hydraulic length of catchment, measured along flow path from Catchment boundary to the point where the flood needs to be Determined (km) Sav = Average slope (m/m) The n values are a composite of information compiled by Engman (1986). 2 When selecting n, consider cover to a height of about 0.03 m. This is the only part of the plant cover that will obstruct sheet flow. Table 4- 9: Roughness Coefficients (Manning’s n) for Sheet Flow Surface Description n1 Smooth surfaces (concrete, 0.011 asphalt, gravel, or bare soil) Fallow (no residue) 0.05 Cultivated soils: Residue cover < 20% 0.06 Residue cover > 20% 0.17 Short grass 0.15 Dense Grasses 0.24 Range (natural) 0.13 Light underbrush 0.4 Dense underbrush 0.8 Grasses: Woods:2 Source: ERA Design Drainage Manual When cross sectional information of the open channel (stream cross section parameter for the entire reach) is acquired, the average velocity of the open channel flow can be calculated using manning’s equation 1 V r 2 / 3 s1/ 2 Were: V = Average velocity, m/s n Engineering Works Consultant PLC. 39 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 r = Hydraulic radius, m (equal to A/Pw) A =Cross section area of the flow, m2 Pw =Wetted perimeter, m S =Slope of the hydraulic grade line, m/m n =Manning’s roughness coefficient For small catchments areas, where the maximum elevation difference of the watershed could not be determined on the available map scale. The velocity method is adopted. It is based on the concept of travel time (Tv) for a flow segment is a function of length of flow (L) and the velocity. The following equations were used: TC L 60 * V Where: TC = Time of concentration [minutes] L = Distance from remote point to the point of crossing [m] V = Average velocity [m/sec] (Table 4-4) In order to minimize and avoid any errors in calculating time of concentration, particularly when the average basin slope varies significantly from the mean channel slope (as in steep mountainous areas), the time of concentration is calculated for two sections. The first one is from the low point to 0.7 point and the second one is from the 0.7 point to the end of the channel. Further subdivision of the waterway was carried out for those streams that traverse different terrain. The rational method of peak flood computation shown in Appendix 6 & 7 of this report. 4.5.4 SCS Unit Hydrograph Method This method is developed by the U. S. Soil Conservation Service for calculating rates of runoff and requires the same basic data as the Rational Method: catchment area, a runoff factor, time of concentration, and rainfall. The SCS approach, however, is more sophisticated in that it considers also the time distribution of the rainfall, the initial rainfall losses to interception and depression storage, and an infiltration rate that decreases during the course of a storm. With the SCS method, the direct runoff can be calculated for any storm, either real or fabricated, by subtracting infiltration and other losses from the rainfall to obtain the precipitation excess. Peak flood computation using SCS method requires the following input data; I. Catchment Area One of the most important parameters which govern the amount of peak flood at a particular outlet point is the size and shape of watershed. The catchment area will be determined from topographic maps and field surveys. Engineering Works Consultant PLC. 40 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. II. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Rainfall The SCS method is based on a 24-hour storm event which has a Type II time distribution. The Type II storm distribution is a typical time distribution which the SCS has prepared from rainfall records. It is applicable for interior rather than the coastal regions and should be appropriate for Ethiopia. To use this distribution, it is necessary for the user to obtain the 24-hour rainfall value for the frequency of the design storm desired. III. Rainfall – Runoff equation A relationship between accumulated rainfall and accumulated runoff was derived by SCS from experimental plots for numerous hydrologic and vegetative cover conditions. Data for landtreatment measures, such as contouring and terracing, from experimental catchment areas were included. The equation was developed mainly for small catchment areas for which daily rainfall and catchment area data are ordinarily available. It was developed from recorded storm data that included total amount of rainfall in a calendar day but not its distribution with respect to time. The SCS runoff equation is therefore a method of estimating direct runoff from 24-hour or 1-day storm rainfall. The equation is: P−Ia 2 � = P−Ia +S Where: Q = accumulated direct runoff, mm P = accumulated rainfall (potential maximum runoff), mm Ia = initial abstraction including surface storage, interception, and infiltration prior to runoff, mm S = potential maximum retention, mm The relationship between Ia and S was developed from experimental catchment area data.It removes the necessity for estimating Ia for common usage. The empirical relationship used in the SCS runoff equation is: Ia = 0.2*S Substituting 0.2*S for Ia, the SCS rainfall-runoff equation becomes: �= 25400 � − �. � ∗ � � � + �. � ∗ � S = CN−254 S is related to the soil and cover conditions of the catchment area through the CN. CN has a range of 0 to 100, and S is related to CN by: IV. Runoff Factors Engineering Works Consultant PLC. 41 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Runoff is rainfall excess or effective rainfall - the amount by which rainfall exceeds the capability of the land to infiltrate or otherwise retain the rainwater. The principal physical catchment area characteristics affecting the relationship between rainfall and runoff are land use, land treatment, soil types, and land slope. a) Land Use Land use is the catchment area cover, and it includes both agricultural and non-agricultural uses. Items such as type of vegetation, water surfaces, roads, roofs, etc. are all part of the land use. Land treatment applies mainly to agricultural land use, and it includes mechanical practices such as contouring or terracing and management practices such as rotation of crops. The SCS uses a combination of soil conditions and land-use (ground cover) to assign a runoff factor to an area. These runoff factors, called runoff curve numbers (CN), indicate the runoff potential of an area. The higher the CN, the higher is the runoff potential. b) Hydrologic Soil Groups Soil properties influence the relationship between rainfall and runoff by affecting the rate of infiltration. The SCS has divided soils into four hydrologic soil groups based on infiltration rates (Groups A, B, C, and D). These shall be given to the effects of urbanization on the natural hydrologic soil group. If heavy equipment can be expected to compact the soil during construction or if grading will mix the surface and subsurface soils, appropriate changes shall be made in the soil group selected. Also, runoff curve numbers vary with the antecedent soil moisture conditions, defined as the amount of rainfall occurring in a selected period preceding a given storm. In general, the greater the antecedent rainfall, the more direct runoff there is from a given storm. A five-day period is used as the minimum for estimating antecedent moisture conditions. For this particular section of the project the soil type lies under hydrological soil group B. c) Runoff Curve Numbers The ERA Design Manual gives a series of tables related to runoff factors. The tables are based on an average antecedent moisture condition, i.e., soils that are neither very wet nor very dry when the design storm begins. Curve numbers shall be selected only after a field inspection of the catchment area and a review of cover type and soil maps. Care shall be taken in the selection of curve numbers (CN's). Use a representative average curve number, CN, for the catchment area. Selection of overly conservative CN’s will result in the estimation of excessively high runoff and consequently excessively costly drainage structures. Selection of conservatively high values for all runoff variables results in compounding the runoff estimation. It is better to use average values and design for a longer storm frequency. The main catchment’s characteristics considered in determining its CN are: Engineering Works Consultant PLC. 42 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Hydrological Soil Properties Land cover properties (including land use, its treatment and hydrological condition) The soils in the catchment relative wetness or dryness just prior to the rainfall event. The potential maximum soil water retention, S, is related to hydrologic soil properties, land cover and management conditions as well as, the soil moisture status of the Catchment prior to rainfall event and expressed by a dimensionless response index termed the catchment curve number (CN) The CN and S are related as follows: S 25400 254 CN The CN number is selected according to soil type, moisture condition and land cover/use of the watershed area. A. Ia/p Parameter Ia/p is a parameter that is necessary to estimate peak discharge rates. Ia denotes the initial abstraction and p is the 24-hour rainfall depth for a selected return period. The 24-rainfall depth is taken from the frequency analysis result found in section 2.4. For a given 24-hour rainfall distribution Ia/P represents the fraction of rainfall that must occur before runoff begins. B. Peak Discharge Estimation The following equation were used for the estimation of the peak discharge in SCS method qp =qu*A*Q Where qp = peak discharge, m3/s qu = unit peak discharge, m3/s/km2/mm A = drainage area, Km2 Q = depth of runoff, mm The unit peak discharge is obtained from the following equation, which requires the time of concentration (tc) in hours and the initial abstraction rainfall (Ia/p) ration as input: qu = ∝∗ ����+�������+�� ����� � Where Co, C1 and C2 = regression coefficients given in table 2-9 for various Ia/p ratios: conversion factor equal to 0.000431 in SI unit. Table 4- 10: Coefficients for SCS Peak Discharge Method Rainfall Type Ia/P C0 C1 C2 I 0.1 2.3055 -0.51429 -0.1175 Engineering Works Consultant PLC. 43 = unit Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Rainfall Type IA II III Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Ia/P C0 C1 C2 0.2 2.23537 -0.50387 -0.08929 0.25 2.18219 -0.48488 -0.06589 0.3 2.10624 -0.45695 -0.02835 0.35 2.00303 -0.40769 0.01983 0.4 1.87733 -0.32274 0.05754 0.45 1.76312 -0.15644 0.00453 0.5 1.67889 -0.0693 0 0.1 2.0325 -0.31583 -0.13748 0.2 1.91978 -0.28215 -0.0702 0.25 1.83842 -0.25543 -0.02597 0.3 1.72657 -0.19826 0.02633 0.5 1.63417 -0.091 0 0.1 2.55323 -0.61512 -0.16403 0.3 2.46532 -0.62257 -0.11657 0.35 2.41896 -0.61594 -0.0882 0.4 2.36409 -0.59857 -0.05621 0.45 2.29238 -0.57005 -0.02281 0.5 2.20282 -0.51599 -0.01259 0.1 2.47317 -0.51848 -0.17083 0.3 2.39628 -0.51202 -0.13245 0.35 2.35477 -0.49735 -0.11985 0.4 2.30726 -0.46541 -0.11094 0.45 2.24876 -0.41314 -0.11508 0.5 2.17772 -0.36803 -0.09525 As per the physiographic and climate data of delineated watershed area of the project area catchment area are large greater than 65km2 a peak discharge has been computed using HEC 1/SCS method with WMS software. Representative HEC-1/SCS analysis for major river watersheds are as demonstrated in the section below with design rainfalls for rainfall region A4 is used for the peak discharge computation to Muztera Tcc and Kebte tera is as detailed below; Engineering Works Consultant PLC. 44 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Figure 4- 8: Muztera Tcc @ 0+378 Delineated Watershed Area and Drainage Pattern Figure 4- 9: Hydrograph for Muztera Tcc @ 0+378 Engineering Works Consultant PLC. 45 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Figure 4- 10: Kebte Tera Chiro wereda @ 1+020 Delineated Watershed Area and Drainage Pattern Figure 4- 11: Hydrograph for Kebte Tera Chiro wereda @ 1+020 The computation sheet of hydrological design /peak flood computation using SCS method is presented in the Appendix. Engineering Works Consultant PLC. 46 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 4.6 Hydraulic Design 4.6.1 General Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 In the previous chapter, the runoff of the catchment area is determined. The next step is to provide adequate, economical and sustainable drainage system that suite the site conditions for design discharge. Making the road corridor drainable enough to the extent possible and keep the road from flood and its detrimental effect is the fundamental principle for highway drainage design & development of Chiro Town internal Asphalt Road project. Evaluating existing drainage system/ environment and formulating improved drainage system without creating additional load or stress to existing condition is the main approach on drainage management improvement of the project. Hydraulic assessment and design have been undertaken mainly based on peak discharge estimates from hydrological analysis and geometric data obtained from ground survey of project corridor. Apart from these, detail hydraulic design of drainage structures more importantly considers physical prevailing hydraulic conditions as realized from detail onsite survey complemented by elder’s historical drainage related information. Pipe and slab/ box culvert and bridge under cross drainage structures, side ditch and flow conveying channel on longitudinal flow conveying structures category have been identified and designed to impart good surface drainage system of the road. Outlet side flow guide ditch also provided to convey the runoff with improved hydraulic features till appropriate disposal point. Embankment/ fill requirement of the road is determined based on onsite overland flow and floodplain flow desk and physical assessment findings. Roadside drainage facility of appropriate type and size has been designed to collect runoff generated from road surface on urban areas and inlet side flow guide ditch to direct overland and dispersed flow towards proposed structure. Outlet side channelization and flow guide works are also recommended to improve hydraulic efficiency of the proposed structures. 4.6.2 Hydraulic Design Standard The chief aim of this task was to determine the opening sizes of the drainage structures from the rate of flood runoff (discharge) and the volume of runoff that will pass through the bridge. This method deploys the hydraulic characteristics of the stream influencing the maximum discharge, such as velocity of flow, slope of the stream, cross sectional area of the stream and shape and roughness of the stream. This method will be used for major streams to compute the design flood levels at crossing sites after the design discharges have been estimated by the hydrological methods of either the SCS Unit Hydrograph Method and compared with the observed flood marks. Cross-Sections of the crossing sites are being determined by the survey. Engineering Works Consultant PLC. 47 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 4.6.3 Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Manning’s Formula of Hydraulic Analysis This method deploys the hydraulic characteristics of the stream influencing the maximum discharge, such as velocity of flow, slope of the stream, cross sectional area of the stream and shape and roughness of the stream. This method is used for the design flood levels at crossing sites after the design discharges have been estimated by the hydrological methods of the SCS Unit Hydrograph Method. Cross-Sections of the crossing sites have been determined by the survey. Accordingly, the following Manning’s equation is used for high-water computations: � � Where: 4.6.4 � � = � ∗ �� ∗ �� ∗ � Q = Discharge in [m3/sec] R = Hydraulic mean depth [m] = A/P A = Cross-sectional flow area [m2] P = Wetted perimeter [m] S = Longitudinal bed slope [%] n = Manning’s roughness coefficient Culvert and Auxiliary Facility Hydraulic Design Drainage structures hydraulic sizing has been made both to small and relatively larger streams deserving culverts on the proposed alignment. FHWA HY 8.7 advanced culvert hydraulic design software have been used for culvert hydraulic evaluation and sizing purpose. As indicated on the Employer’s requirement, all minor drainage structures (if any) shall be replaced by new ones of minimum size 1220mm diameter. Culvert hydraulic design criteria defined on the employer’s requirement (minimum size 1220mm, HW/D ration 1.5 and outlet treatment) has been considered. Three major drainage management systems have been adopted in the stretch of the road under consideration using culvert structures: Side collected flow relief culvert mainly in town sections Defined flow from relatively larger and small sheets conveying culvert to downstream side crossing the road Plain and flood plain section generated flow (widely spread and shallow depth) disposal structures. The rule of thumb when installing a culvert is that natural channel modifications should be minimized and that any constriction of the channel flow width must be avoided. This can be done by maintaining the natural grade and alignment of the channel through the culvert. Depending Engineering Works Consultant PLC. 48 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 upon flow type and pattern, hydraulic design approach adopted for culvert vary according to the case. Single culvert design approach mostly for defined flow condition and multiple structure hydraulic design approach for wide plain and floodplain section considering as a single hydraulically serving unit adopted in the project. Sample culvert hydraulic design to each case is demonstrated on subsequent section. 4.6.5 Pipe Culverts The pipe culvert culverts were designed using hy-8software and design nomograph for the HW/D of 1.2 though the manual allows to HW/D of 1.5. Besides, Figure 4- 12: Design Nomograph for the Concrete Pipe Design From the above the nomograph, the capacities of Concrete Pipe with 1.22m diameter is 3.0m3/s for HW/D =1.20 (HW=1.59m) Concrete Pipe with 1.06m diameter is 2.0m3/s for HW/D =1.20 (HW=1.27m) and Concrete Pipe with 0.91m diameter is 1.23m3/s for HW/D =1.20 (HW=1.10m) Single or double pipe culverts were proposed depending on the magnitude of estimated discharge. Inlets and outlets of culverts will have paved waterways, as per ERA standard, for protecting scour of foundation materials. The end walls will be determined in consideration of type and direction of Engineering Works Consultant PLC. 49 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 flow among the possible alternatives of ERA standard. Furthermore, a check for exit velocities and scour-ability of the streambed will be undertaken. From total of all road segment there are 54 crossing structure are proposed pipe culvert 4.6.6 Slab/box Culverts . The hydraulic opening size determination has been carried out using both trial and error procedure and HY8 computer modelling. The hydraulic analysis and design output of major culverts using HY8 is shown in the figures below. The summery of hydraulic analyses of slab and box culvert is presented under annex-part. From total of all road segment there are 12 crossing structure are proposed Slab culvert. The hydraulic analysis of slab culverts at each station were presented in appendix Sample HY-8 Software output Table 4- 11: Input of hydraulic data for HY8 from Hundi Gudina Scl Nejebac Kidane Mihret @km 2+060 Engineering Works Consultant PLC. 50 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Figure 4- 13: HY-8 hydraulic analysis output result along the culvert at station 2+060 Summary table result of the proposed culvert capacity including fill height As shown from the above hy-8 output the size of 3.0m X 2.5m Slab/Box culvert is only overtopped beyond 20.79m3/s but design discharge is 13.47m3/s hence, it is clearly safe. Engineering Works Consultant PLC. 51 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 The same method of HY-8 calculation execution is used for others proposed crossing slab/box culverts. 4.6.7 Design of Major Cross Drainage Structures Bridges and multiple cell box or slab culverts having a total span of greater than 6m are categorized under major drainage structures. However, in this section discus about only major drainage structure Bridge. The following are the criteria related to the hydraulic analyses for the sufficiency of the bridge. Location: The location of major crossing structures should be selected in such a way that there exit minimum span with suitable foundation and having straight reach of stream. The foundation should have preferably strong (naturally sound rock) bearing capacity and less scourablity to minimize the overall cost of the structure. Design Floods: For purposes of the evaluation of backwater (afflux), clearance, and overtopping, design floods have been established. Backwater: Backwater and/or increases over existing condition up to 0.5 m during the passage of the design flood, if practicable. Further, backwater shall not significantly increase flood damage to property upstream of the crossing. Clearance: A minimum clearance conforming to the requirements of the Bridge Design manual shall be provided between the design approach water surface elevation and the low chord (soffit) of the bridge to allow for passage of debris. Clearance (free board) will be according to ERA’s Bridge Design Manual whose values are as stated below. Table 4- 12: Free board recommendation as per ERA DDM Discharge, Q (m3/s) Freeboard (m) 0 – 3.0 0.3 3.0 -30 0.6 30 -300 0.9 > 300.0 1.2 Depending on the availability of sufficient data, hydraulic design and analysis of major drainage structures can be carried out by simple spread sheet analysis of Manning’s equation as well as hydraulic modelling software like HEC-RAS. Manning’s equation has been used for developing the rating curve at major cross drainage structures. 2 1 1 Q A R 3 S 2 n Engineering Works Consultant PLC. 52 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Where: - Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Q = Discharge in m3/s n = weighted manning’s roughness coefficient R = hydraulic radius (m) S = Slope of energy grade line or channel bed slope (m/m) After developing the stage discharge curve, the peak design discharge is used to locate the High Flood Mark (HFM). The effect of Back water is considered for all cases. The normal water level which corresponds to flood with corresponding return period has been taken as High-Water Mark (HWM). The waterway (opening area) at the bridge is designed taking into account the backwater effect due to constriction and scour. A spread sheet computation using HEC-RAS modelling in the principle of manning equation were used for checking the hydraulic adequacy of existing structures as well as for hydraulic opening size analysis and design of newly proposed bridges. From total of all road segment there are 5 crossing structure are proposed bridges Structures, proposed and the HEC-RAS output of the bridge is shown below. Bridge at Hundi Gudina Scl Nejebac Kidane Mihret 0+418Km For bridge site located at 0+418km, survey data has been collected and HEC RAS model has been run considering discharge load as shown below: Design discharge =136.5m3/s Figure 4- 14: HEC-RAS Output after addining Bridge waterprofile Engineering Works Consultant PLC. 53 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Station@0+418 the propose bridge size 10m span by 4m clear height. Therefore, for defined span and clear height arrangement mainly considered from onsite physical survey and preliminary desk modelling, HEC RAS model has been run and evaluated for potential backwater effect 4.6.8 Design of Longitudinal Drainage Facility A roadside ditch is defined as an open channel paralleling the highway embankment within the limits of the highway right-of-way. Its primary function is to collect runoff from the highway and areas adjacent to the right-of-way and to transport this accumulated water to an acceptable outlet point. A secondary function of a roadside ditch is to drain the base of the roadway to prevent saturation and loss of support for the pavement. Side ditches will be designed to carry the storm water run-off originating from the carriageway, shoulder, drain and cut/back slope as well as channelized streams. The design of side ditch shall be undertaken to ensure that no overtopping will occur. The expected flow, run-off, will be estimated using the following formula: Q=1/360(C x I x A) Where: Q the expected flow (m3/s) C the runoff coefficient I the intensity of rainfall (mm/hr) A the area drained (hectares) 2 Q K A R 3 S 1 2 A V 2 1 V KR 3 S 2 The capacity of side ditch will be estimated using Manning Striker formula (metric): Where:Q Capacity of ditch (m3/s) A cross sectional area of water (m2) V velocity of flow (m/s) K roughness coefficient (Table 3.3) R hydraulic radius (A/P where P is the wetted perimeter) S longitudinal slope (m/m) Limiting values for the velocity of flow (V) to prevent scour, together with the corresponding roughness coefficients are given in table below. Engineering Works Consultant PLC. 54 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 4- 13: Roughness coefficients and Maximum permissible velocity Max. Ditch material Permissible Roughness velocity (m/s) coefficient Sand, loam, fine gravel, volcanic ash 0.6 45 Stiff clay 1.1 50 Coarse gravel 1.5 40 Conglomerate hard shale, soft rock 2.0 25 Hard rock 5.0 25 Masonry 5.0 40 Concrete 10.0 60 The introduction of erosion protective measures such as check dams and ditch lining in all places where the velocity of water exceeds the maximum permissible velocity for the corresponding ditch material given in table 3-2 above would be very expensive for the specific class of roads. Therefore, for these In places where the velocity of water in the ditch exceeds 10 m/s., check dams in addition to ditch lining is required in order to reduce the speed of water. Wherever the velocity of water in the ditch is between 3.0 – 5.0 m/sec. dry masonry check dams as per the standard given in the detailed engineering design to be introduced. Depending on the topographic feature and location (rural/ urban) of the proposed road alignment, the following provisions can be adopted and can modified and amended based on local situations. A. Flat Areas In flat areas drains are required for the following conditions: Cut section Embankment height is less than 1m. Embankment height is more than 1m but the surrounding ground is falling towards the project road The side drains in the flat areas of the triangular unlined type. the depth is kept at a minimum of 0.50 m and the side slopes are 1 vertical to 2 horizontals. However, in the expansive soils areas, the trapezoidal, unlined drains have been replaced with lined drains (of the type used in the rolling areas) The bottom of the drain is 0.5 m wide, to prevent the exchange of moisture with the deeper layers of soils and in town section the rectangular ditch with lined with appropriate dimension based on discharge is proposed. Engineering Works Consultant PLC. 55 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. B. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Rolling Areas The drains to be used in the rolling areas could be trapezoidal lined type depending on the longitudinal grade of the road and sub-grade material extension. The bottom of the drain is 0.5 m wide; the side slops depend on the embankment side slope of the road. The depth of the drain is kept to a minimum of 0.50 m. C. Mountainous and Escarpment Areas The drains to be used in the mountainous and very steep areas are of the rectangular / trapezoidal lined type with minimum bottom width and depth of 0.5 m and 0.5m respectively depending on the longitudinal grade of the road and sub-grade material extension. The side slops depend on the embankment side slope of the road. D. Urban Areas The design of a drainage system for a carriageway traversing an urbanized region is generally a more complex problem than for carriageways traversing sparsely settled rural areas. This is often due to: The wide carriageway sections, flat grades, both in longitudinal and transverse directions, shallow water courses, absence of side channels; The more costly property damages which may occur from ponding of water or from flow of water through built-up areas; The fact that the carriageway section must carry traffic, but also act as a channel to convey the water to a disposal point. Unless proper precautions are taken, this flow of water along the carriageway will interfere with or possibly halt the passage of highway traffic. The drains to be used in the urban areas are of the rectangular lined type or pipe culvert where relevant. To evacuate runoff drainage from the pavement curb inlets are proposed at every 20-25 m. Based on the above description and as per ERA DDM 2013 recommendation, It recommends new ditch and the size of ditch proposed depend on catchment discharge, but the shape of the ditch mainly governing by considering urban, Rural, Soil extension of the project and Discharge, although the ditch type whether lined or unlined depend on Urban/Rural, topography and soil type. Others stretch of the side ditch design the same concept and some procedure from the above, 4.6.9 Bridge Scouring Engineering Works Consultant PLC. 56 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 The intensity and extent of scouring effect on major drainage structure crossings are a paramount importance for the safety and sustainability of the highway projects. Hence through understanding and investigation of scouring effect discussed as follows. Scour computation is based on ERA Drainage Design Manual and based on the reference “Evaluating Scour at Bridges, Fourth Edition (US, National Highway Institute (NHI))” Scour is the result of the erosive action of flowing water, excavating and carrying away material from the bed and banks of streams. Different materials scour at different rates. Loose granular soils are rapidly eroded by flowing water, while cohesive or cemented soils are more scour resistant. However, ultimate scour in cohesive or cemented soils can be as deep as scour in sandbed streams. Under constant flow conditions, scour will reach maximum depth in sand and gravel bed materials in hours; cohesive bed materials in days; glacial tills, sand stones and shale in months; limestone in years and dense granites in centuries. Under flow conditions more typical of actual bridge crossings, several floods will be needed to attain maximum scour. A factor in scour at highway crossings and encroachments is whether the scour is clear-water or live-bed scour. Clear–water scour occurs where there is no transport of bed material upstream of the crossing or encroachment and live-bed scour occurs where there is transport of bed materials from the upstream reach into the crossing or encroachment. Total scour at a highway crossing is comprised of three components. Long-term aggradations and degradation, Contraction scour and Local scour (due to pier and abutment) 4.6.10 Back water effect (Afflux) The intensity and extent of scouring and backwater effect on major drainage structure crossings are a paramount importance for the safety and sustainability of the highway projects. Hence through understanding and investigation of scouring and backwater effect discussed as follows. The restriction to free water flow due to piers and abutment causes the head of water to rise on the upstream side of the structure. The water level downstream may also be lowered and the velocity increases. It is necessary to estimate the rise of water level on the approach side to ensure that the river banks will not be breached where overflowing flood water would cause damage, and to check that the desired clearance for floating debris or river traffic is maintained below the superstructure. The magnitude of backwater can be affected by the shape of the river bed, its eccentricity, scour holes and related factors. The shape of the bridge works also influences the magnitude of back water effect, i.e. by any skew, river training, embankments and relief culverts. configuration, a good estimate may be made using the formula below: Engineering Works Consultant PLC. 57 For simple Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. h Where:h = Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 V2 W2 2 2 1 2g c L afflux V = average velocity of flow [m/sec] g = acceleration due to gravity [9.8 m/sec2] W = unobstructed width of the stream [m] L = linear water way of the bridge opening less obstruction width, if any [m] C = coefficient of discharge through the bridge, taken as 0.7 for sharp entry and 0.9 for bell mouthed entry. 4.7 Conclusions and recommendations A total of 71 cross drainage structures have been designed and evaluated on section of the road from of the projects where 5 structure considered as bridge, 54 pipe culverts and the remaining 12as slab/ box structures. The life of roads and utilities depend on the drainage system installed at appropriate locations. With this regard an economical and sustainable drainage system has been studied and proposed for the section of the road alignment. As we have discussed and presented trough out this report the proposed road alignment traversing on a predominately Rolling and mountainous terrain, since, there are number of small and large crossing structures to be constructed to prevent standing water and overlapping. Making the road corridor drainable enough is the main drainage objective of the project addressing both hydrological analysis and hydraulic designs. From physical drainage assessment and detail desk analysis, it has been realized that defined sheet flows, overland and concentrated floodplain flows are the major drainage features of the project deserving management option appropriate to it. Defined streams/ sheets flow accommodating facility design, overland flow guide It has been believed that drainage design substantially addresses project hydrological and hydraulic problems at draft level but due drainage inter-related features unforeseen features may prevail to existing indicating subsequent inspection, correction and implementation works both at desk and site level. From project specific features related to drainage, overall project safety and sustainability not only depends on the intervention made by contractor rather the local community and administration should take a part on land, localized drainage management and flood protections works. In this regard, the Oromia roads and logistic bureau and employer’s representative are advised to play a vital role in cooperating all parties and building project ownership. Engineering Works Consultant PLC. 58 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 5 GEOMETRIC DESIGN 5.1 Introduction Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 The overall process of the road alignment (horizontal and vertical) design in different terrain condition to meet the need of the road users is generally known as geometric design. The main geometric features are: The horizontal alignment; Vertical alignment; and Road Cross Section Besides these main features, geometric design involves design of road furniture and safety enhancing structures and elements The process of geometric design usually encompasses design considerations resulting from multidisciplinary studies which try to define the various contexts of the project road. Accordingly, geometric design has to be carried out in a context sensitive manner. Context Sensitive Design is a collaborative, interdisciplinary approach that involves all constituents to develop a transportation facility that fits its physical setting and preserves scenic, aesthetic, historic and environmental resources, while maintaining safety and mobility to all road users, and enhancing the economic, social and other needs of the society. In terms of this concept, it is assumed that every project is unique which requires designers to address the needed roadway improvements while safely integrating the design into the unique surrounding natural and built environment. Thus, geometric design must aim at combining various geometric design elements to produce a sound and harmonious design which Provide the simplest geometry attainable, consistent with the physical constraints, Provide a design that has a reasonable and consistent margin of safety at the expected design speeds, Provide a facility that is adequate and convenient to all the road users at the expected traffic conditions, Provide a facility that is Stable and Sustainable Provide a facility that is in harmony with the community and preserves environmental, scenic, aesthetic, historic, and built and natural resources of the area. Provide a facility that has acceptable economic returns The hallmark of professionalism in geometric design is the ability to foresee and optimize the contrasting objectives that are inherent in any geometric design project outlined above. Good Engineering Works Consultant PLC. 59 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 highway design is the art of combining and balancing the various controls in a perceptive fashion and is not merely an exercise in three dimensional geometrics. These different objectives of road engineering should be prioritized initially according to their importance to the specific project. For instance, a section of high standard road that has to pass through a deep reserved forest may have to be designed to the lowest design standard possible to minimize negative impacts to the forest. Geometric design standards often define parameters and limiting values considering the following three main objectives: it shall ensure safety and comfort of drivers; it shall ensure that the road is designed economically; and it must ensure uniformity of the alignment In line with what is stated above, geometric design standards often try to define acceptable and economical level of service, and margin of safety with limited emphasis on roadway aesthetics for the particular design standard. However, they barely define acceptable level of stability, social and environmental returns and impacts. So, often compromising geometric design standards to fulfil these other important objectives of highway design in an optimal manner is imperative. These geometric elements have important bearing on how the road will function, its capacity, driver behaviour and safety. The traditional approach in geometric design considers the three views of layout plan, longitudinal section and cross-section. The road user sees the road as a constantly changing continuum as he drives along, and the appearance of the road influences the driver's behaviour. It is therefore important to provide the motorist with reasonable clues as which provide guide and inform him as to what to expect as he drives along the road; such clues should be clear messages, which are unlikely to mislead him. Applying standard and practice without considering the prevailing circumstances is no substitute for judgment, and brings no assurance of acceptable end product. Equally, design prepared without referring to general accepted standard and practice are not likely to serve the travelling public as intended. Design based on a combination of sound professional judgment, applicable standards and current practices will generate the most effective road. It is also good to note that standards usually give guidance whenever the terrain and other associated factors are in favour of the selected geometric design standard. Nowadays the name “manual” is being replaced with “Guide to”. This manifest that “manuals” are sensed as more restricting to the designer to use his judgment and experience. The purpose of this replacement is thus to give the designer more space and flexibility to arrive at balanced design in reconciliation of the different contrasting objectives of road facilities. Therefore, the geometric design standards Engineering Works Consultant PLC. 60 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 summarized in ERA manual should be intended to provide guidance for designers rather than to be considered as rigid minima. Departures from standard made to produce optimized design with varying level of compromise among the contrasting multi-objectives of highway facilities including safety, stability, serviceability, economy, environmental and social compatibility, and practicality of the design for construction and maintenance are therefore often required especially in roadways that traverse through difficult terrain conditions and sensitive social and environmental areas. With these considerations in mind, the consultant team of experts has carried out detailed assessment of the project road corridor which is mostly new and partly existing alignment and geometric design standards have been established. The designer has attempted to provide an appropriate design standard that confirms to the existing road terrain condition and combinations of these elements should be defined in relation to the following controls factors: Topography and land use Road function Traffic volume Design vehicle and vehicle characteristics Design speed and other speed controls Road safety considerations Environmental considerations Economic and financial considerations Thus the Consultant has emphasized and attempted to arrive at a final design, which: Fits into the existing natural condition, terrain by making a balance with the physical and social environment, Fulfils the projected traffic requirements, and Encourages consistency and uniformity of operation. Is economical for implementation Has a reasonable and consistent margin of safety at the expected design speeds, Is adequate and convenient to all the road users at the expected traffic conditions, Is in harmony with the community and preserves environmental, scenic, aesthetic, historic, and built and natural resources of the area. Engineering Works Consultant PLC. 61 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 5.2 Design Control and Criteria 5.2.1 Functional Classification Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Road function is basically related to the most common types and purposes of travel, trip and character of service the roads provide. The character of service can broadly be understood as mobility, access and a mixture of Mobility and Access. In the Ethiopian context road classification is based on the function of the road it serves. In line with this the Ethiopian Roads Authority Geometric Design Standard Manual, 2013, has classified the existing roads based on the function they serve. It has also set terms on which future road classification should base. Functional classification (the grouping of highways by the character of service they provide) of roads was developed mainly for transportation planning purposes. ERA’S Design Standard classifies roads into five (5) categories based on the character of service they provide. These are Trunk Roads Link Roads Main Access Roads Collector Roads Feeder Roads As the main purpose of the project road is to mainly provide access to the society chiro incorporate 9 Road Segments. However, Chiro Town Internal Asphalt project is an urban road project hence the road functional classification shall better be by urban city road class. Table below shows the classification. Table 5- 1: Road segment class and road width Road Segment Description Road Total Road Class Way Width 1 Muz tera –TTC-Qilisa SAS 20 2 Kebt tera-Chiro Wereda Office SAS 20 3 Sumeya Bridge-Addis Ketema CS 10 CS 15 Center-ODA CS 15 4 5 Agape Hotel-Agri Center-TTC Agri Reserch Reserch Engineering Works Consultant PLC. Design Key Context Speed (km/h) Mixed 30 Residential/ 30 commercial Residential/ 30 commercial Residential/ 30 commercial Residential/ 30 62 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Road Segment Description Road Total Road Class Way Width Bultu University-Main Asphalt Chiro Town Administration- 6 20 CS 15 CS 10 CS 15 Chiro Wereda Office – Care CS 10 Hundi 7 Gudina Scl-Nejebac Kidane Mihret Hundi Gudina Scl-Aschalew 8 Hotel Blood 9 Bank-Gende Bono 10 Kuteba Design Key Context Speed (km/h) commercial CS Mtichu-Leila Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Ethiopia Mixed 30 Mixed 30 Residential 30 Residential/Partly Commercial Residential/Partly 30 30 Commercial ERA Geometric design parameters for design standard DC6 is adopted for the project road. 5.2.2 Geometric Classification ERA Geometric classification of roads known as design standards of roads classifies roads by the design Annual Average Daily Traffic (AADT) of the road. This geometric class is then associated with design speed depending on terrain and urbanization of the area, which links the geometric characteristics of the road with its function, the physical conditions of the area and the environment. According to ERA Geometric Design Manual, various factors influence selection of road geometric standard. The most notable ones are: function of the road, volume of traffic, terrain through which the road traverses, road safety, and economy. Roads standards are mainly selected based on the road’s intended capacity to accommodate traffic. Accordingly, for high traffic volumes a higher design standard road should be provided (i.e., wider carriageways, gentle curves, flatter vertical gradient, full overtaking distances etc.) while the opposite is true for low traffic. The function of the road is determined by the character and anticipated level of service that the road would deliver. Typically, this relates to functional classification of the road for which a generic definition is given (based on the standard under consideration) indicating its primary function and purpose. It is also understood that the improvement of road standards (e.g. upgrading of pavement surface, wider carriageway, higher speed, better sight distance etc.) would reduce the rates of accidents. However, this may not be necessarily true and in effect may increase accident rates on the Engineering Works Consultant PLC. 63 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 contrary. This is due to the fact that accidents have higher degree of dependence on road user behaviour, vehicle condition as well as vehicle speeds etc. Therefore, in adopting a certain geometric design standard, these factors (including others) are taken into consideration implicitly within the standards. Among various parameters, selection of geometric design standard should consider the alignment constraints imposed by the terrain, and recommend appropriate design speed to be adopted for particular sections. Appropriate typical cross sections shall also be used for rural, urban, and periurban and for the different terrain conditions. The other most important factor is the economic feasibility of the project road; that the benefits of the road to the society and the country as a whole would compensate for the construction, maintenance, vehicle operation and other costs of the project road. A higher design standard road on the basis of the project traffic volume, road function and terrain having unacceptable economic rate of return may sometimes be avoided and in place of it the project road may need to be designed for a lower geometric standard road thereby the overall costs could decrease and the road becomes economical with acceptable economic rate of return. 5.2.3 Traffic Volume and Characteristics Road standards are also selected based on the road’s intended capacity to accommodate traffic. Normally, for high traffic volumes a higher set of design standard (i.e. wider carriageways, gentle curves, flatter vertical gradient, full overtaking distances etc.) are anticipated while the vice versa is true for low traffic. A traffic count on the proposed project road, Chiro Town Internal Asphalt Road Project road was conducted because the project road is accessible for the traffic as well there are very limited trip generating frequency from the origins and destination specially related to the agricultural investments lands. Therefore, the consultant estimates the project traffic from the developmental generate traffic. After developmental data are collected, detail data calculation and analysis is carried out to arrive at the Annual Average Daily Traffic (AADT) that will use the proposed road up on completion of its construction. To determine the design AADT, the determination or selection of the design life of the project road has been determined. Design Life The approach recommended for estimating the traffic for geometric design purpose is based on the estimated traffic level at the mid-year of the design life and this therefore requires an estimate of Engineering Works Consultant PLC. 64 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 the traffic growth rate. This method eliminates the risk of under design that may occur if the initial traffic is used and the risk of over design if traffic at the end of the design life is used. A design life of 15 to 20 years is recommended for paved roads and 20 years for paved roads. Based on the ERA Pavement Design Manual 2013, the determination of the design period should consider different factors such as Functional importance of the road, Traffic volume, Location and terrain of the project, financial constraints and difficulty in forecasting traffic. The manual provides the general guide line for selecting the design period as shown in the table below. Table 5- 2: Road functional Classification verses Design Period Road Classification Design Period (years) Trunk Road 20 Link Road 20 Main Access Road 15 Other Roads 10 For the subject project since it is considered as urban city road class a design period of 20 years from the year the road is opened to traffic i.e. (2028- 2047) is considered for geometric design. The project road is expected to be opened to traffic in the year 2028. Traffic Forecasting and AADT Traffic projection has been made for 20 consecutive years of the design period by applying the growth rates estimated above. The following table gives the forecasted traffic during the design period of the project. The summary of the traffic forecast is shown in tables below. Table 5- 3: Traffic forecast of road segment 6 and 7 at station 1 for the years 2028– 2047 Road segment 6 and 7 Private Vehicles Public Transport Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total Sum 2028 670 131 8 7 1 14 8 7 0 845 2029 729 142 9 7 1 16 9 7 0 920 2030 793 155 10 8 1 17 10 8 0 1001 2031 863 168 10 8 1 19 11 9 0 1089 2032 939 183 11 9 1 20 12 9 0 1185 2033 1,022 199 12 10 1 22 13 10 0 1290 2034 1,112 217 13 11 1 24 14 11 0 1403 2035 1,210 236 14 12 1 26 15 12 0 1527 Year Goods Vehicles Engineering Works Consultant PLC. 65 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Road segment 6 and 7 Private Vehicles Public Transport Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total Sum 2036 1,316 257 16 13 2 29 17 13 0 1662 2037 1,432 279 17 14 2 31 18 14 0 1808 2038 1,559 304 19 15 2 34 20 16 0 1968 2039 1,696 331 20 16 2 37 22 17 0 2141 2040 1,845 360 22 18 2 40 23 19 0 2330 2041 2,008 392 24 19 2 44 26 20 0 2535 2042 2,185 426 26 21 3 48 28 22 0 2759 2043 2,377 464 28 23 3 52 30 24 0 3002 2044 2,587 505 31 25 3 57 33 26 0 3266 2045 2,815 549 33 27 3 62 36 29 0 3554 2046 3,063 598 36 29 4 68 39 31 0 3867 2047 3,332 650 39 32 4 74 43 34 0 4208 Year Goods Vehicles Source; consultant Table 5- 4: Traffic forecast of road segment 2 at station 2 for the years 2028– 2047 Road segment 2 and 10 Private Vehicles Public Transport Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total Sum 2028 2150 370 169 60 17 109 35 19 13 2939 2029 2,339 402 183 65 18 118 38 21 14 3198 2030 2,545 438 199 70 20 129 42 22 15 3480 2031 2,769 476 216 77 22 141 46 25 16 3787 2032 3,013 518 235 83 24 153 50 27 18 4120 2033 3,279 564 256 90 26 167 54 29 19 4483 2034 3,568 613 278 98 28 182 59 32 21 4878 2035 3,882 667 302 107 30 198 64 35 23 5308 2036 4,224 726 328 116 33 216 70 38 25 5776 2037 4,596 790 356 126 36 236 76 41 28 6285 2038 5,001 860 387 137 39 257 83 45 30 6839 2039 5,441 935 421 149 42 280 91 49 33 7441 2040 5,921 1,018 458 162 46 305 99 53 36 8097 2041 6,442 1,108 497 176 50 332 108 58 39 8810 Year Goods Vehicles Engineering Works Consultant PLC. 66 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Road segment 2 and 10 Private Vehicles Public Transport Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total Sum 2042 7,010 1,205 540 191 54 362 118 63 43 9586 2043 7,628 1,311 587 208 59 395 128 69 46 10431 2044 8,300 1,427 638 226 64 430 140 75 51 11350 2045 9,031 1,552 694 245 69 469 152 82 55 12350 2046 9,826 1,689 754 267 75 511 166 89 60 13438 2047 10,692 1,838 819 290 82 557 181 97 66 14622 Year Goods Vehicles Source; consultant Table 5- 5: Traffic forecast of road segment 3 at station 2 for the years 2028– 2047 Road segment 3 Private Vehicles Public Transport Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total Sum 2028 2150 370 169 60 17 54 18 9 6 2852 2029 2,339 402 183 65 18 59 19 10 7 3103 2030 2,545 438 199 70 20 64 21 11 7 3376 2031 2,769 476 216 77 22 70 23 12 8 3673 2032 3,013 518 235 83 24 77 25 13 9 3997 2033 3,279 564 256 90 26 83 27 15 10 4349 2034 3,568 613 278 98 28 91 30 16 11 4731 2035 3,882 667 302 107 30 99 32 17 12 5148 2036 4,224 726 328 116 33 108 35 19 13 5601 2037 4,596 790 356 126 36 118 38 21 14 6095 2038 5,001 860 387 137 39 128 42 22 15 6631 2039 5,441 935 421 149 42 140 45 24 16 7215 2040 5,921 1,018 458 162 46 152 49 27 18 7850 2041 6,442 1,108 497 176 50 166 54 29 20 8541 2042 7,010 1,205 540 191 54 181 59 32 21 9294 2043 7,628 1,311 587 208 59 197 64 34 23 10112 2044 8,300 1,427 638 226 64 215 70 38 25 11002 2045 9,031 1,552 694 245 69 234 76 41 28 11971 2046 9,826 1,689 754 267 75 256 83 45 30 13025 2047 10,692 1,838 819 290 82 279 90 49 33 14172 Year Goods Vehicles Source; consultant Engineering Works Consultant PLC. 67 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 5- 6: Traffic forecast of road segment 1-1 at station 2 for the years 2028– 2047 Road segment 1-1 Private Vehicles Public Transport Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total Sum 2028 2465 491 207 74 18 78 32 21 7 3393 2029 2,682 534 225 81 19 85 35 23 7 3692 2030 2,919 581 245 88 21 93 38 25 8 4017 2031 3,176 632 266 96 23 101 41 28 8 4371 2032 3,456 688 289 104 25 111 45 30 9 4756 2033 3,760 748 314 113 27 120 49 33 10 5174 2034 4,091 814 341 123 29 131 53 36 11 5630 2035 4,452 886 371 133 32 143 58 39 12 6126 2036 4,844 964 403 145 35 156 63 42 13 6665 2037 5,271 1,049 438 157 38 170 69 46 14 7252 2038 5,735 1,141 476 171 41 185 75 50 16 7891 2039 6,241 1,242 517 186 45 202 82 55 17 8586 2040 6,790 1,351 562 202 48 220 89 60 19 9342 2041 7,389 1,470 611 220 53 240 97 65 20 10164 2042 8,039 1,600 664 239 57 261 106 71 22 11060 2043 8,748 1,741 722 259 62 285 116 78 24 12034 2044 9,518 1,894 784 282 68 310 126 85 26 13093 2045 10,357 2,061 852 306 74 338 137 92 29 14246 2046 11,269 2,242 926 333 80 369 150 100 31 15501 2047 12,262 2,440 1,007 362 87 402 163 109 34 16866 Year Goods Vehicles Source; consultant Table 5- 7: Traffic forecast of road segment 1-2 at station 2 for the years 2028– 2047 Road segment 1-2 Private Vehicles Public Transport Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total Sum 2028 3224 554 253 89 25 81 26 14 9 4278 2029 3,508 603 275 97 27 89 29 15 10 4654 2030 3,818 656 299 106 30 97 31 17 11 5064 2031 4,154 714 324 115 32 105 34 18 12 5510 2032 4,520 777 353 125 35 115 37 20 13 5995 Year Goods Vehicles Engineering Works Consultant PLC. 68 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Road segment 1-2 Private Vehicles Public Transport Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total Sum 2033 4,918 845 383 136 38 125 41 22 15 6523 2034 5,351 920 417 147 42 136 44 24 16 7097 2035 5,823 1,001 453 160 45 149 48 26 17 7722 2036 6,336 1,089 492 174 49 162 53 28 19 8402 2037 6,894 1,185 535 189 53 177 57 31 21 9142 2038 7,501 1,290 581 206 58 193 62 34 23 9947 2039 8,162 1,403 632 223 63 210 68 37 25 10822 2040 8,881 1,527 686 243 69 229 74 40 27 11775 2041 9,664 1,661 746 264 75 249 81 43 29 12812 2042 10,515 1,808 811 287 81 272 88 47 32 13940 2043 11,441 1,967 881 312 88 296 96 52 35 15168 2044 12,449 2,140 958 339 96 323 105 56 38 16503 2045 13,546 2,329 1,041 368 104 352 114 61 41 17956 2046 14,739 2,534 1,131 400 113 383 124 67 45 19537 2047 16,038 2,757 1,229 435 123 418 136 73 49 21258 Year Goods Vehicles Source; consultant Table 5- 8: Traffic forecast of road segment 5 at station 3 for the years 2028– 2047 Road segment 5 Private Vehicles Public Transport Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck 2028 673 185 88 53 18 49 51 2029 732 202 95 57 20 54 2030 796 219 103 62 22 2031 867 239 112 68 2032 943 260 122 2033 1,026 283 2034 1,116 2035 Year Goods Vehicles Track Total Trailer Sum 0 0 1117 56 0 0 1215 58 61 0 0 1322 23 64 67 0 0 1439 73 25 69 73 0 0 1565 133 80 28 76 79 0 0 1703 307 144 87 30 82 86 0 0 1853 1,215 335 157 94 33 90 94 0 0 2017 2036 1,322 364 170 102 35 98 102 0 0 2194 2037 1,438 396 185 111 39 107 112 0 0 2387 Engineering Works Consultant PLC. 69 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Road segment 5 Private Vehicles Public Transport Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck 2038 1,565 431 201 121 42 116 122 2039 1,703 469 219 132 46 127 2040 1,853 510 238 143 49 2041 2,016 555 258 155 2042 2,194 604 281 2043 2,387 657 2044 2,597 2045 Year Goods Vehicles Track Total Trailer Sum 0 0 2598 132 0 0 2827 138 144 0 0 3076 54 150 157 0 0 3346 169 58 164 172 0 0 3641 305 184 64 179 187 0 0 3962 715 332 199 69 195 204 0 0 4311 2,826 778 360 217 75 212 222 0 0 4691 2046 3,075 847 392 236 82 231 242 0 0 5104 2047 3,346 921 426 256 89 252 264 0 0 5553 Source; consultant Table 5- 9: Traffic forecast of road segment 4, 8 and 9 at station 4 for the years 2028– 2047 Road segment 4,8 and 9 forecast @ station-4 Private Vehicles Public Transport Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck 2028 631 242 77 30 2 48 28 2029 687 263 84 32 2 52 2030 748 286 91 35 2 2031 813 312 99 38 2032 885 339 107 2033 963 369 2034 1,048 2035 Year Goods Vehicles Track Total Trailer Sum 24 0 1083 31 26 1 1178 57 34 28 1 1282 3 62 37 31 1 1395 41 3 68 40 33 1 1518 117 45 3 74 44 36 1 1651 402 127 49 3 81 48 40 1 1797 1,140 437 138 53 4 88 52 43 1 1955 2036 1,241 475 150 58 4 96 56 47 1 2128 2037 1,350 517 163 63 4 104 62 51 1 2315 2038 1,469 563 177 68 5 114 67 56 1 2519 2039 1,598 612 192 74 5 124 73 61 1 2741 2040 1,739 666 209 80 5 135 80 67 1 2983 Engineering Works Consultant PLC. 70 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Road segment 4,8 and 9 forecast @ station-4 Private Vehicles Public Transport Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck 2041 1,892 725 227 87 6 147 87 2042 2,059 789 247 95 6 161 2043 2,240 859 268 103 7 2044 2,438 934 292 112 2045 2,653 1,016 317 2046 2,886 1,106 2047 3,140 1,203 Year Goods Vehicles Track Total Trailer Sum 73 1 3246 95 79 2 3532 175 103 86 2 3843 8 191 112 94 2 4182 122 8 208 123 102 2 4551 345 132 9 227 134 112 2 4952 374 144 10 247 146 122 2 5389 Source; consultant As can be seen from the above tables, the forecasted AADT ‘s at mid-life of the design period is shown below the table: Table 5- 10: Design Standard for sections of the Project Road Mid-Year (2033) Design Station Project road segments 1 Road segment 6 and 7 1968 DC6 ERA 2013 Road segment 2 and 10 6839 DC7 ERA 2013 Road segment 3 6631 DC7 ERA 2013 Road segment 1-1 7891 DC7 ERA 2013 Road segment 1-2 9947 DC7 ERA 2013 Road segment 5 2598 DC6 ERA 2014 2519 DC 6 ERA 2013 2 3 Road segment 4,8 and 4 9 AADT Standard Remark The design standard estimation for each station is as shown in the above, the road segments fall on to DC6 and DC7 as per the projected traffic at midyear. 5.2.4 Terrain Classification Topography and physical features play an important role in the location and design of a road. To design a road economically and adequately and to entertain the different factors, the design elements must be related to topographic features. Engineering Works Consultant PLC. 71 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 In general, construction costs will be greater as the terrain becomes more difficult and higher standards will become less justifiable or achievable in such situations than for roads in either flat or rolling terrain. Drivers should also expect lower standards in such conditions and therefore adjust their driving accordingly, so minimizing accident risk. Design speed will therefore vary with terrain. Terrain class need to be established before a road is designed hence it needs to be defined independently of the alignment that is finally selected for the road. It is determined by counting the number of 5 meter contours crossed by straight line connecting the two ends of the road section in question according to Ethiopian Roads Authority Geometric Design Manual, 2013 as shown below Flat: 0-10 five meter contours per Km. the transverse ground slopes perpendicular to the ground contours and generally below 3% Rolling: 11-25 five-meter contours per km. the transverse ground slopes perpendicular to the ground contours are generally between 3% and 25% Mountainous: 26-50 five-meter contours per km. the transverse ground slopes perpendicular to the ground contours are generally above 25% Escarpment: are geological features that require special geometric standards because of the engineering problems involved. They are characterized by more than 50 five meter contours per km and the transverse ground slopes perpendicular to the ground contours are generally greater than 50% Terrain classification is a useful tool which explains the physical characteristics of the project area and its influence on drivers’ selection of operating speed. As such terrain type is directly related to design speed for each functional class, and geometric design standard of roads as explained in ERA Geometric Design Manual. Thus, the station wise terrain classification of the project is used to set different design speeds and corresponding limiting values (minimum or maximum) for geometric elements depending on the terrain type. The project road has been studied thoroughly from 1:50,000 topographical maps, aerial photos prior to and during a field reconnaissance. The detailed topographic survey results also examined in order to classify the road corridor and accordingly the project road is classified in to sections of varying terrain based on ERA terrain classification criteria, as it is presented in Table below. Table 5- 11: Terrain Classification of the Road Project NO 1 Station (KM) Road Segment From 0+000 AL-S1 0+420 1+500 To 0+420 1+500 6+026 Engineering Works Consultant PLC. Length (km) 420.00 1080.00 4526.00 Type of Terrain Rolling Mountainous Rolling 72 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Station (KM) Road Segment From To 0+000 0+600 2 AL-S2 0+600 1+238 3 AL-S3 0+000 0+525 4 AL-S4 0+000 0+600 5 AL-S5 0+000 1+238 0+000 0+265 0+265 1+100 1+100 2+480 6 AL-S6 2+480 4+490 4+490 5+265 5+265 5+765 5+765 6+200 7 AL-S7 0+000 2+544 8 AL-S8 0+000 0+853 9 AL-S9 0+000 0+830 10 AL-S10 0+000 1+600 Table 5- 12: Percentage distribution of terrain NO Length (km) 600.00 638.00 525.00 600.00 1238.00 265.00 835.00 1380.00 2010.00 775.00 500.00 435.00 2544.00 853.00 830 1600 Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Type of Terrain Mountainous Rolling Rolling Rolling Rolling Rolling Mountainous Rolling Mountainous Rolling Mountainous Rolling Rolling Rolling Rolling Rolling Summary Of Terrain Classification No. Description of Terrain Type Length (m) Percentage 1 Escarpment - 0 2 Mountainous 17061.25 80.265% 3 Rolling 4195.00 19.74% 4 Flat 0 As can observed in the table above, the project road mainly traverses through Rolling topography which make up about 80.21% of the project length. 5.2.5 Type of area Classification Sections of roads are also classified on the basis of the type of area (surrounding built and natural environment) generally as “Rural”, “Rural Natural”,” Rural foot path”, “Peri-urban trading-centers”, “Peri-urban” and “Urban”. The types and characteristics of roads differ in relation to the type of area as the characteristics of road users differ depending on the type of area. The project area is dominantly urban settlement, the project area is dominantly urban settlement; residential, commercial, institutional, religious establishments and few government offices exist. The project area seat as wereda seat. 5.2.6 ERA Design Standards Based on ERA’s Geometric Design Manual DC6 standard is used for the Detail design of the road. Engineering Works Consultant PLC. 73 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Road users and their characteristics Road users Vehicles, Non-motorized traffic Special road users such as unavoidable carts and animals that share the road facilities To fulfil the fundamental objective of safety and efficiency of the road, the types, composition, characteristics and interaction of all expected road users are studied. The space, safety, access and mobility requirements of all types of road users are typically considered in the design by classifying the project into different areas (Town, Village and rural areas), developing different types of typical sections for each area and assigning appropriate design speed classifying the project road into different terrain classes and assigning different design speeds designing the geometry considering the road users’ characteristics and expectations (especially driver expectations) throughout the project road Design Speed The Design Speed is the selected speed which correlated with the terrain conditions and the classification of the road class used to determine the various design of the road way. Design elements such as lane width, horizontal radius, super elevation, sight distance and gradient are directly related to design speed. Thus all of the geometric design parameters of a road are directly related to the selected design speed. In addition to this, various factors influence the speed of vehicles on a particular road. These includes Driver capability, driver culture and behaviour Vehicle operating capabilities The physical characteristics of the road and its surrounding Weather Presence of the other vehicles and Speed limitation (Posted Speed limits) When a change in topographical character or some other constraint necessitates a change in alignment standard, the change should be made clear to the driver. This is best achieved by a Engineering Works Consultant PLC. 74 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 sequence of horizontal curves, each having a predicted speed consistent with the design criterion. When going from a high to a low standard, the predicted speed on sequential curves should not differ by more than 10 km/h, and the speed environment relevant to each curve can be taken as the predicted speed of the previous curve. Design Vehicle The selection of the appropriate design vehicle is a key element related to lane width, vertical clearance, and minimum radius and turning paths at switch back curves and intersections. It also affects design elements such as curve widening, maximum gradient, critical length of maximum gradient, and provision of climbing lanes. For the project road, the selected design vehicle is DV4 (Semi trailer combination) with the following physical characteristics. Table 5- 13: Design vehicle physical characteristics Dimensions (m) Design Designation Vehicle Semi-Trailer Combination DV4 Overhang(m) Height Width Length Front Rear 4.1 2.6 15.2 1.2 1.8 Wheel Min. base Turning (m) Radius(m) 13.2 13.7 The minimum turning radius of DV4 vehicle is 13.7m, which is the absolute minimum internal radius used in the design of hair-pin bends. The minimum offset of the rear wheel path is 0.5m as shown in ERA Geometric standard. It is stated in ERA ‘s geometric design manual 2013 that the present fleet in Ethiopia includes a high number of four-wheel drive utility vehicles and overloaded trucks. Until more detailed information becomes available regarding the makeup of the vehicle fleet in Ethiopia, the four design vehicles indicated in the Table below should be used in the control of geometric design. Table 5- 14: Design Vehicle Design Design Vehicle 4x4 Utility Vehicle Single Truck Unit Overhang Overall (m) Vehicle (m) Wheel base (m) Min. Design Turning Designation Height Width Length Front Rear DV1 1.3 2.1 5.8 0.9 1.5 3.4 7.3 DV2 4.1 2.6 11.0 1.5 3.0 6.5 12.8 Engineering Works Consultant PLC. 75 Radius (m) Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Design Vehicle Single Unit Bus Semi-Trailer Combination Design Overhang Overall (m) Vehicle Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 (m) Designation Height Width Length Front Rear DV3 4.1 2.6 12.1 2.1 2.4 DV4 4.1 2.6 15.2 1.2 1.8 Wheel base (m) 7.6 Min. Design Turning Radius (m) 12.8 4.8+8.4= 13.2 13.7 Table 5- 15: Design Vehicle for each road class Deign Standard Design vehicle DC8, DC7, DC6, DC5 DV4 DC4 DV4 DC3 DV3 DC2 DV3 DC1 DV1 Based on the ERA manual, appropriate design vehicle is placed for each road design standard as shown in the Table 5.9 above. Since the project road has been categorized as DC6, the design vehicle of DV4 has been used for design of the road. Moreover, for sections with sharp curve (radius less than 40) in order to accommodate passage of single DV4 and a DV1 vehicle widening of 1.5m is applied to both sides of the road. The minimum turning radius of DV4 vehicle is 13.7m, which is the absolute minimum internal radius used in the design of hair-pin bends. The minimum offset of the rear wheel path is 0.5m as shown in ERA Geometric standard. The design vehicle template is shown on Figure below. Engineering Works Consultant PLC. 76 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Figure 5- 1: Design Vehicle template Pedestrians The following special characteristics of pedestrians are taken into consideration during the design. Select the shortest path between two points. Have resistance to changes in gradient or elevation when crossing roadways and Avoid using inconvenient sections of roadway facilities such as muddy walkways Pedestrian volume and activities are high to moderate in Towns than in villages and rural areas. In rural areas of the project pedestrian volume and activities are found insignificant. Accordingly, pedestrians as one of the major road users are considered in Town and village areas only. Cyclists Cyclist volume and activity is insignificant in the whole project area. 5.2.7 Selection of Design Standard Parameters and Their Limiting Values On the basis of the design controls and criteria and the objective of the project discussed in the above sections, a design standard consisting of limiting design values for the design of the different features of the road is selected. The design standard provided in the next sections is mostly derived from ERA Geometric design standard with a few contextual modifications of some design element parameters to suit project conditions and objectives. Engineering Works Consultant PLC. 77 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Geometric Design Elements Table 5-11 below summarizes all the pertaining geometric design elements, parameters and limiting design values (minimum or maximum) for design controls, horizontal alignment and vertical alignment. Table 5- 16: Design Standards Design controls and elements of Controls Design Item design Limiting values for design Road Functional Classification SAS and CS Road Present Road Condition 10m to 15m wide shared road RS (6 and 7), (2,10),3,1,5, (4,8,9) Design Traffic volume (1968,6839,6631,7891,9947,2598 and 2519) respectively Geometric Design standard DC6 Design Vehicle DV4 Rural Terrain and land use Flat Rolling Mountainous Escarpment Village Town Design speed (km/hr) 100 85 70 60 50 50 g=0% 210 155 110 85 65 65 Stopping sight distance g=5% 240 175 120 90 70 70 (m) g=10% 285 205 140 105 75 75 Minimum Passing sight distance (m) 375 330 270 230 180 180 515 350 215 145 95 95 curve SE=6% 455 310 195 135 85 85 SE=8% 410 280 175 120 - - Transition (spiral) curve requirement No No No No No No Maximum super elevation 8 8 8 8 4 4 Design super elevation As per Table 8.5 and 8.6 (ERA Manual 2013) Design runoff length As per Table 8.5 and 8.6 (ERA Manual 2013) Percent passing opportunity (%) SE=4% for urban Minimum Horizontal Alignment Horizontal radius Minimum switch back curve inner 15 Alignment Vertical radius 15 Curve widening As per Table 8.3 (ERA Manual 2013) Maximum Gradient(Desirable) 3 5 7 7 6 6 Maximum Gradient(Absolute) 5 7 9 9 8 8 0.5 0.5 0.5 0.5 0.5 Minimum Gradient for curbed road and 0.5 Engineering Works Consultant PLC. 78 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Design controls and elements of Item design Limiting values for design cut cross-section areas Minimum gradient for uncurbed road at 0.5 0.5 0.5 0.5 0.5 0.5 No No No No No No 100 55 30 17 10 25 18 12 9 7 Limiting K-factor for crest vertical 270 230 165 50 180 embankment areas Climbing lane requirements Limiting K-factor for crest vertical curves(stopping sight distance) Limiting K-factor for sag vertical curves(stopping sight distance) 7 180 curves(passing sight distance) Cross section Elements 10 Type of Surfacing Asphalt Carriageway width/cross fall 3m/2.5% Shoulder surfacing/width/cross fall - - - 3.5/6 (at selected Parking lane width/cross fall - place) 3.5/6 Curb requirement yes yes yes Walkway width/cross fall 2m/3% yes yes Side slope Refer sections below Back slopes Refer sections below Road side ditches Refer Typical sections Cross sectional elements Road width should be minimized so as to reduce the costs of construction and maintenance whilst being sufficient to carry the traffic loading efficiently and safely. Accordingly, various cross-sections are proposed, each addressing a specific need along that portion of road traversed. Proposals are listed for A. Side slopes for cuts and fills Side slopes should be designed to insure the stability of the roadway and to provide a reasonable opportunity for recovery of an out-of-control vehicle. Three regions of the roadside are important when evaluating the safety aspects: the top of the slope (hinge point), the side slope, and the toe of the slope (intersection of the fore slope with level ground or with a back slope, forming a ditch) Engineering Works Consultant PLC. 79 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 The selection of side/back slopes has been made dependent upon stability (Soil extension), height of fill or cut and type of material. The recommended cut and fill slopes extracted from ERA 2013 manual but slightly modified to suite site specific geological conditions and rock mass characteristics Table 5- 17: Slope Ratio Table – Vertical to Horizontal Height Material of Side Slope (V:H) Back Slope Slope (m) Fill Earth 0.0 - 1.0 1:3 1:3 Soil/Decomposed 1.0 - 2.0 1:2 1:2 Rock >2.0 2:3 2:3 0 .0 – 2.0 4:5 >2.0 1:1 4:1 0.0 – 2.0 2:3 2:1 >2.0 1:1 3:1 Strong Rock Weathered Rock Black Cotton Soil 0.0 – 2.0 1:6 (expansive Clays)(1) 1:4 >2 5.3 Geometrical Design of the Project Road 5.3.1 General Cut 1:2 - 2:1 - The Geometric design of the project road has been carried out with Civil 3D design Software. The survey data in the form of X, Y, Z is loaded into the software to prepare a DTM model. The road is designed in accordance with different design philosophies formulated depending on the type of terrain and the type of area. Different design elements and parameters appropriate to the design controls and criteria have also been prepared as described above which are specifically employed depending on the context of the section of the road. In the course of the design, maximum effort has also been exerted to achieve design consistency, to meet road user expectations and perceptions of the designed road and its environment by limiting speed changes within tolerable limits throughout the project road. The design has been generally carried out to the selected minimum standard. In addition, where design controls and constraints are not severe, the road is designed to a higher standard to minimize future road upgrading costs. 5.3.2 Analysis Horizontal Alignment Design Engineering Works Consultant PLC. 80 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 The project road is generally located in dominantly Rolling terrain and local Mountainous terrain. But the horizontal alignment of the project road is designed for design speeds 50km/hr as town section because our project is urban city project. The horizontal alignment is characterized by long tangents and gentle curves in rolling sections and short tangent and sharp reverse in mountainous sections. The horizontal alignment of the detailed final design of the road is discussed in sections since it all passes through rolling terrain. For analysis purpose, the project road is divided into road segment sections as described below: Table 5- 18: Road segment of the project road RS-1 0+000-5+789.96 RS-2 0+000-1+238.25 RS-3 0+000-0+519.33 RS-4 0+000-0+591.32 RS-5 0+000-1+237 RS-6 0+000-6+186 RS-7 0+000-2+760 RS-8 0+000-0+861 RS-9 0+000-0+816.99 RS-10 0+000-1+655.99 The horizontal alignment geometry is separately analysed for all Road segment. The analysis includes determination of the over length of curves and straight section, Table below. Table 5- 19: Road segment by percentage curve lengths S.No Section RS-1 Curve section (m) Length Straight section (m) (m) (M) (%) (M) (%) 0 - 5789.96 5789.96 1958.181 33.82% 3831.779 66.18% RS-2 0 -1238.25 1238.25 345.75 27.92% 892.5 72.08% RS-3 0 - 519.33 519.33 137.803 26.53% 381.527 73.47% RS-4 0 - 591.32 591.32 0 0.00% 591.32 100.00% RS-5 0 - 1220 1220 179.689 14.73% 1040.311 85.27% RS-6 0 - 6186.36 6186.36 2857.987 46.20% 3328.373 53.80% RS-7 0 - 2767.04 2767.04 833.434 30.12% 1933.606 69.88% RS-8 0 - 861 861 245.473 28.51% 615.527 71.49% Engineering Works Consultant PLC. 81 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 RS-9 0 - 817 817 115.569 14.15% 701.431 85.85% RS-10 0 - 1655.99 1655.99 0.000 0.00% 1655.99 100.00% Generally, it can be observed from the summarized table that the overall percentage of length of the curve is substantial in section 1. This is due to the difficult nature of the terrain along the route. From the analysis in Table above, the road sections can be summarized into the following speed ranges as provided in Table below the speed zones are: <50 km /hr Between 50 km /hr and 60 km/hr Between 50 km /hr and 70 km/hr Table 5- 20: Comparison of sections by speed distribution relative to the overall length of the curve No Road segment Road Section <50km/hr Length of Curved Stretch Overall Length of 50km/hr-60km/hr 60km/hr-70km/hr curve RS-1 0 - 5789.96 1958.181 0 0 1958.181 RS-2 0 -1238.25 345.75 0 0 345.750 RS-3 0 - 519.33 137.803 0 0 137.803 RS-4 0 - 591.32 0 0 0 0.000 RS-5 0 - 1220 179.689 0 0 179.689 RS-6 0 - 6186.36 2857.987 0 0 2857.987 RS-7 0 - 2767.04 833.434 0 0 833.434 RS-8 0 - 861 245.473 0 0 245.473 RS-9 0 - 817 115.569 0 0 115.569 RS-10 0 - 1655.99 0 0 0 0.000 Total Length of Curves 6673.886 As it can be seen from the above table more than 100% of the curves are designed for design speed 50km/hr. Spatial distribution of horizontal curve radii The reciprocal of the proposed radii and the minimum radii have been plotted against the chainages along the section of the project road to appreciate the spatial distribution and extent of the departures. The sections where the reciprocal of the proposed radii are greater than the reciprocal of the minimum radii indicate the sections with departure from minimum radii and the Engineering Works Consultant PLC. 82 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 larger the difference between the reciprocal of the proposed radii and the minimum radii, the higher the extent of the departure. Figure 5- 2: Reciprocal of radii plot against the Chainages for road segment 1: (0-5+789.96) Figure 5- 3: Reciprocal of radii plot against the Chainages for Road segment 2: (0-1+238.25) Figure 5- 4: Reciprocal of radii plot against the Chainages for Road segment 3: (0-0+519.33) Engineering Works Consultant PLC. 83 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Figure 5- 5: Reciprocal of radii plot against the Chainages for Road segment 5: (0-1+237) Figure 5- 6: Reciprocal of radii plot against the Chainages for Road segment 6: (0-6+186) Figure 5- 7: Reciprocal of radii plot against the Chainages for Road segment 7: (0-2+760) Engineering Works Consultant PLC. 84 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Figure 5- 8: Reciprocal of radii plot against the Chainages for Road segment 8: (0-0+861) Figure 5- 9: Reciprocal of radii plot against the Chainages for Road segment 9: (0-0+817) Built up areas (Towns section) The horizontal alignment of the project road in built up areas is designed by bisecting the existing right of way so that balanced right of obstructions could be removed. According to ERA manual the typical town cross-sections are categorized for Region Seat, Zonal Seat, Wereda Seat and Kebele seat. The project road traverses through Wereda Seat and Kebele seat. Chiro Town have master plan accordingly; we provide the road way from the master plan. The towns and villages bisected along the project road are provided in Table below. Table 5- 21: Built up areas Road No. Project Name Estimated Width (m) Length (km) 1 Muz tera –TTC-Qilisa 5.78996 20 2 Kebt tera-Chiro Wereda Office 1.23825 20 3 Sumeya Bridge-Addis Ketema 0.51933 10 Engineering Works Consultant PLC. 85 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Road No. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Estimated Project Name Width (m) Length (km) 4 Agape Hotel-Agri Reserch Center-TTC 0.59132 15 5 Agri Reserch Center-ODA Bultu University-Main Asphalt 1.237 15 6 Chiro Town Administration-Mtichu-Leila 6.189 20 7 Hundi Gudina Scl - Nejebac Kidane Mihret 2.76 15 8 Hundi Gudina Scl - Aschalew Hotel 0.861 10 9 Blood Bank-Gende Kuteba Bono 0.817 15 10 Chiro Wereda Office – Care Ethiopia 1.655.99 10 Total Length 5.3.3 21.66 Vertical Alignment The ground profile along the proposed alignment is extracted from the ground model. Then, the ground profile is traced with gradients and appropriate vertical curves using the vertical alignment design options in Civil 3D Road design software. This has enabled us to have Gradient Information Vertical curve information of the existing and designed road This information is compared with the limiting design values (minimum or maximum for design standard, DC6) depending on the terrain type The gradient is categorized into five classes to measure the severity of gradients as provided below. 0 to 4% - Gentle gradient with little impact on vehicle operation 4 to 6% - Rolling gradient with moderate impact on vehicle operation 6 to 10%- Hilly gradient with significant impact on vehicle operation 10 to 12% - Grade beyond the limit DS5 standard which has significant impact on vehicle operation and level of service of the road. >12% - Grade is difficult to impossible to be traversed by heavy trucks especially articulated truck trailer combinations The vertical alignment analysis is shown in the tables below. Table 5- 22: Summary of Vertical Alignment Analysis Road segment -1 Grade Number of Distance along various Grades Curves 0-400 400-1000 1000+ % No (m) (m) (m) 0-4 9 2147.46 Engineering Works Consultant PLC. Total Percentage (m) % 2147.46 37.37% 86 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Grade Number of Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Distance along various Grades Total Percentage (m) % 1656.36 28.83% 1139.61 19.83% 406.12 802.81 13.97% 0 0 0.00% 5746.24 100.00% Curves 0-400 400-1000 1000+ % No (m) (m) (m) 4.-6 6 1028.29 628.07 6-.9 5 1139.61 9-.12 2 396.69 >12 0 0 Total Table 5- 23: Summary of Vertical Alignment Analysis Road segment -2 Number Distance along various Grades of Curves 0-400 400-1000 1000 % No (m) (m) (m) 0-4 1 4.-6 Grade Total Percentage (m) % 177.26 177.26 15.84% 2 468.46 468.46 41.86% 6-.9 1 319.83 319.83 28.58% 9-.12 1 153.53 153.53 13.72% >12 0 0 0 0.00% 0 0 Total 1119.08 100.00% Table 5- 24: Summary of Vertical Alignment Analysis Road segment -3 Grade Distance along various Grades Number of Total Percentage (m) % 247.49 247.49 68.59% 113.36 113.36 31.41% 0 0 0.00% 9-.12 0 0 0.00% >12 0 0 0.00% Curves 0-400 400-1000 1000+ % No (m) (m) (m) 0-4 2 4.-6 1 6-.9 Total 360.85 100.00% Table 5- 25: Summary of Vertical Alignment Analysis Road segment -4 Grade Number of Distance along various Grades Curves 0-400 400-1000 1000+ % No (m) (m) (m) 0-4 1 412.2 Engineering Works Consultant PLC. Total Percentage (m) % 412.2 100.00% 87 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Grade Number of Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Distance along various Grades Total Percentage (m) % 0 0 0.00% 6-.9 0 0 0.00% 9-.12 0 0 0.00% >12 0 0 0.00% Curves 0-400 400-1000 1000+ % No (m) (m) (m) 4.-6 Total 412.2 100.00% Table 5- 26: Summary of Vertical Alignment Analysis Road segment -5 Grade Number of Distance along various Grades Total Percentage (m) % 429.96 38.13% 697.63 61.87% 0 0 0.00% 9-.12 0 0 0.00% >12 0 0 0.00% 1127.59 100.00% Curves 0-400 400-1000 1000 % No (m) (m) (m) 0-4 2 429.6 4.-6 2 250.59 6-.9 447.04 Total Table 5- 27: Summary of Vertical Alignment Analysis Road segment -6 Grade Number of Distance along various Grades Total Percentage (m) % 2880.77 2880.77 47.38% 6 1332.38 1332.38 21.91% 6-.9 8 1867.4 1867.4 30.71% 9-.12 0 0 0.00% >12 0 0 0.00% 6080.55 100.00% Curves 0-400 400-1000 1000 % No (m) (m) (m) 0-4 13 4.-6 Total Table 5- 28: Summary of Vertical Alignment Analysis Road segment -7 Grade Number of Distance along various Grades Curves 0-400 400-1000 1000+ % No (m) (m) (m) 0-4 4 1148.3 Engineering Works Consultant PLC. Total Percentage (m) % 1148.3 45.08% 88 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Grade Number of Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Distance along various Grades Curves 0-400 400-1000 1000+ % No (m) (m) (m) 4.-6 2 6-.9 2 891.35 507.74 9-.12 >12 0 Total Total Percentage (m) % 891.35 34.99% 507.74 19.93% 0 0.00% 0 0.00% 2547.39 100.00% Table 5- 29: Summary of Vertical Alignment Analysis Road segment -8 Grade Number of Distance along various Grades Total Percentage (m) % 595.43 595.43 81.91% 131.47 131.47 18.09% 6-.9 0 0.00% 9-.12 0 0.00% 0 0.00% Curves 0-400 400-1000 1000+ % No (m) (m) (m) 0-4 3 4.-6 1 >12 0 Total 726.9 100.00% Table 5- 30: Summary of Vertical Alignment Analysis Road segment -9 Grade Number of Distance along various Grades Curves 0-400 400-1000 1000 % No (m) (m) (m) 0-4 3 701.59 400.7 Total Percentage (m) % 1102.29 88.63% 0 0.00% 141.36 11.37% 0 0.00% 0 0.00% 4.-6 6-.9 1 141.36 9-.12 >12 0 Total 1243.65 100.00% Table 5- 31: Summary of Vertical Alignment Analysis Road segment -10 Grade Number of Distance along various Grades Curves 0-400 400-1000 1000 % No (m) (m) (m) 0-4 3 416.42 655.74 Engineering Works Consultant PLC. Total Percentage (m) % 416.42 51.49% 89 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Grade Number of Distance along various Grades Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Total Percentage (m) % 392.31 48.51% 6-.9 0 0.00% 9-.12 0 0.00% 0 0.00% Curves 0-400 400-1000 1000 % No (m) (m) (m) 4.-6 2 392.31 >12 0 Total 808.73 100.00% Spatial distribution of gradients The proposed grades, the maximum grade (8%) and the minimum grade (0.5%) have been plotted against the Chainages along the section of the project road to appreciate the spatial distribution and extent of the departures. The sections where the proposed grades are greater than the maximum grade indicate departure from maximum grade and the larger the difference between the proposed grade and the maximum grade, the higher the extent of the departure. Figure 5- 10: Spatial distribution of gradients for road segment 1: (0+000 – 5+789.96) Engineering Works Consultant PLC. 90 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Figure 5- 11: Spatial distribution of gradients for road segment 2: (0+000 – 1+238.25) Figure 5- 12: Spatial distribution of gradients for road segment 3: (0+000 – 0+519.33) Figure 5- 13: Spatial distribution of gradients for road segment 4: (0+000 – 0+591.32) Figure 5- 14: Spatial distribution of gradients for road segment 5: (0+000 – 1+237) Engineering Works Consultant PLC. 91 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Figure 5- 15: Spatial distribution of gradients for road segment 6: (0+000 – 6+186) Figure 5- 16: Spatial distribution of gradients for road segment 7: (0+000 – 2+760) Figure 5- 17: Spatial distribution of gradients for road segment 8: (0+000 – 0+861) Engineering Works Consultant PLC. 92 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Figure 5- 18: Spatial distribution of gradients for road segment 9: (0+000 – 0+817) Figure 5- 19: Spatial distribution of gradients for road segment 10: (0+000 – 1+655.99) 5.3.4 Draft Engineering Design Drawings The plan profile drawings will be submitted with the draft tender documents as a separate volume. 5.4 Requested Departures from Standard 5.4.1 General Despite the range of flexibility with standards that exists with respect to virtually all the significant road design features, there are situations in which the application of even the minimum criteria (including any allowable Relaxations) would result in safety, technical, programme, financial or environmental negative impacts greater than the benefits that would be obtained by incorporating the proposed Departure. Highway design usually encompasses multi-disciplinary dimensions that need thorough assessment, analysis and optimizations. Considering these, each project is better studied and Engineering Works Consultant PLC. 93 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 designed in a context sensitive manner. Context Sensitive Design is a collaborative, interdisciplinary approach that involves all constituents to develop a transportation facility that fits its physical setting and preserves scenic, aesthetic, historic and environmental resources, while maintaining safety and mobility to all road users, and enhancing the economic, social and other needs of the society. In terms of this concept, it is assumed that every project is unique which requires designers to address the needed roadway improvements while safely integrating the design into the unique surrounding natural and built environment. The hallmark of professionalism in highway design is the ability to foresee and optimize the conflicting objectives that are inherent in any project. Many of the design controls and criteria of highway design are often conflicting in nature. Good highway design is the art of combining and balancing the various controls in a perceptive fashion and is not merely an exercise in three dimensional geometrics. These different objectives of road engineering should be prioritized initially according to their importance to the specific project. For instance, a section of high standard road that has to pass through a deep reserved forest may have to be designed to the lowest design standard possible to minimize negative impacts to the forest. Geometric design standards often try to define acceptable level of service, and margin of safety with limited emphasis on roadway aesthetics. However, they barely define acceptable level of stability, acceptable level of social and environmental impacts. So, often locally compromising geometric design standards to fulfil these other important objectives of highway design in an optimal manner becomes imperative especially in difficult topography. It is also good to note that standards usually give guidance whenever the terrain and other associated factors are in favour of the selected geometric design standard. Nowadays the name “manual” is being replaced with “Guide to”. This manifest that “manuals” are sensed as more restricting to the designer to use his judgment and experience. The purpose of this replacement is thus to give the designer more space and flexibility to arrive at balanced design in reconciliation the different contrasting objectives of road facilities at selected localized sections. Therefore, the geometric design standards summarized in ERA manual should be intended to provide guidance for designers rather than to be considered as rigid minima. Departures from standard made to produce optimized design with varying level of compromise among the contrasting multi-objectives of highway facilities including safety, stability, serviceability, economy, environmental and social compatibility, and practicality of the design for construction and maintenance are therefore often required especially in roadways that traverse through difficult terrain conditions and sensitive social and environmental areas. Due to the varying nature of Engineering Works Consultant PLC. 94 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Departures, their interaction with each other and the existing and future route conditions, each Departure is unique. 5.4.2 List of Requested Departures from Standard The Requested departures from the standard in the section include departure from minimum radii, departure from maximum grade, and gradients at switch back curves as presented in the following tables. Table 5- 32: Departure from Minimum Horizontal Curve Radii for Road segment-1 Curve Station No. Curve From To Length(m) Radius(m) Deflection Minimum angle(0) Radius(m) Departure 1 0+418.84 0+444.73 25.89 40 37.0843 95 Departed 2 0+505.05 0+549.29 44.244 500 5.07 95 OK 3 0+675.32 0+723.86 48.537 95 29.2735 95 OK 4 0+755.52 0+844.15 88.624 95 53.4506 95 OK 5 0+979.23 1+022.49 43.265 340 7.2909 95 OK 6 1+179.31 1+259.92 80.617 300 15.3968 95 OK 7 1+384.59 1+493.75 109.155 95 65.8331 95 OK 8 1+603.17 1+646.14 42.967 300 8.206 95 OK 9 1+755.92 1+863.61 107.696 150 41.1367 95 OK 10 2+089.41 2+277.41 188.001 95 113.386 95 OK 11 2+332.91 2+403.54 70.624 30 134.8825 95 Departed 12 2+447.24 2+525.46 78.212 55 81.4768 95 Departed 13 2+556.26 2+711.55 155.291 95 93.658 95 OK 14 2+828.20 2+883.69 55.495 135 23.5526 95 OK 15 2+978.84 3+096.42 117.572 95 70.9095 95 OK 16 3+207.74 3+278.14 70.398 600 6.7225 95 OK 17 3+347.81 3+409.93 62.127 165 21.5735 95 OK 18 3+571.44 3+631.36 59.915 300 11.443 95 OK 19 3+841.13 3+889.15 48.023 420 6.5512 95 OK 20 4+027.66 4+107.67 80.013 200 22.922 95 OK 21 4+354.96 4+398.61 43.655 400 6.2531 95 OK 22 4+480.37 4+522.37 42.002 400 6.0163 95 OK 23 4+636.02 4+698.33 62.314 400 8.9258 95 OK 24 4+972.67 5+109.48 136.814 150 52.2592 95 OK Engineering Works Consultant PLC. 95 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 25 5+318.48 5+415.21 96.73 80 Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 69.2777 95 Departed Table 5- 33: Departure from Minimum Horizontal Curve Radii for Road segment-6 Curve Station No. From Curve To Length(m) Radius(m) Deflection Minimum angle(0) Radius(m) Departure 1 0+084.80 0+131.70 46.895 200 13.43 95 OK 2 0+179.07 0+221.48 42.4 300 8.10 95 OK 3 0+253.12 0+271.30 18.181 230 4.53 95 OK 4 0+307.57 0+362.74 55.17 230 13.74 95 OK 5 0+424.72 0+567.01 142.282 160 50.95 95 OK 6 0+657.87 0+707.11 49.232 95 29.69 95 OK 7 0+750.11 0+793.94 43.835 95 26.44 95 OK 8 0+845.58 0+907.89 62.304 95 37.58 95 OK 9 1+035.15 1+084.33 49.183 120 23.48 95 OK 10 1+146.13 1+192.72 46.586 95 28.10 95 OK 11 1+232.18 1+257.48 25.299 200 7.25 95 OK 12 1+325.01 1+368.66 43.652 200 12.51 95 OK 13 1+439.94 1+496.56 56.62 55 58.98 95 Departed 14 1+526.93 1+603.72 76.792 65 67.69 95 Departed 15 1+707.92 1+758.95 51.035 150 19.49 95 OK 16 1+815.42 1+887.68 72.262 65 63.70 95 Departed 17 1+946.17 1+999.74 53.576 95 32.31 95 OK 18 2+093.89 2+317.00 223.105 95 134.56 95 OK 19 2+422.62 2+463.26 40.636 250 9.31 95 OK 20 2+582.42 2+655.74 73.316 175 24.00 95 OK 21 3+023.03 3+109.57 86.545 300 16.53 95 OK 22 3+248.26 3+379.02 130.758 175 42.81 95 OK 23 3+601.49 3+673.39 71.896 100 41.19 95 OK 24 3+754.75 3+914.52 159.771 70 130.77 95 Departed 25 3+951.03 4+121.84 170.81 170 57.57 95 OK 26 4+238.50 4+296.04 57.534 175 18.84 95 OK 27 4+455.64 4+574.83 119.196 175 39.03 95 OK 28 4+678.67 4+718.47 39.797 400 5.70 95 OK Engineering Works Consultant PLC. 96 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Curve No. Station Curve From Length(m) To Radius(m) Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Deflection Minimum angle( ) Radius(m) 0 Departure 29 4+880.69 5+026.81 146.113 112 74.75 95 OK 30 5+242.72 5+282.30 39.573 280 8.10 95 OK 31 5+379.78 5+731.65 351.867 141 142.98 95 OK 32 5+781.19 5+861.46 80.272 375 12.26 95 OK 33 5+923.03 6+054.52 131.494 150 50.23 95 OK Road segment-2,3,4,5,7,8,9 and 10 has no departure from minimum radii. Table 5- 34: Departure from Maximum Grade for Road segment -1 Station No Grade Grade Desirable Absolute Length Maximum Maximum (m) Grade (%) Grade (%) From To (%) 1 0+000.00 0+176.17 -4.50% 176.17 6.00% 8.00% 2 0+176.17 0+329.06 -8.00% 152.89 6.00% 8.00% 3 0+329.06 0+443.24 1.00% 114.18 6.00% 8.00% 4 0+443.24 0+839.93 12.00% 396.69 6.00% 8.00% 5 0+839.93 1+008.16 6.00% 168.23 6.00% 8.00% 6 1+008.16 1+144.31 7.74% 136.15 6.00% 8.00% 7 1+144.31 1+395.17 4.00% 250.86 6.00% 8.00% 8 1+395.17 1+675.29 7.76% 280.12 6.00% 8.00% 9 1+675.29 1+989.40 -2.44% 314.11 6.00% 8.00% 10 1+989.40 2+179.85 5.15% 190.45 6.00% 8.00% 11 2+179.85 2+401.97 -1.18% 222.12 6.00% 8.00% 12 2+401.97 2+591.89 -3.21% 189.92 6.00% 8.00% 13 2+591.89 2+907.60 3.78% 315.71 6.00% 8.00% 14 2+907.60 3+230.40 -3.62% 322.8 6.00% 8.00% 15 3+230.40 3+544.37 5.70% 313.97 6.00% 8.00% 16 3+544.37 3+830.87 3.02% 286.5 6.00% 8.00% 17 3+830.87 4+010.34 6.00% 179.47 6.00% 8.00% 18 4+010.34 4+371.06 7.83% 360.72 6.00% 8.00% 19 4+371.06 4+999.13 6.00% 628.07 6.00% 8.00% 20 4+999.13 5+208.86 -6.63% 209.73 6.00% 8.00% 21 5+208.86 5+340.12 1.00% 131.26 6.00% 8.00% 22 5+340.12 5+746.24 11.95% 406.12 6.00% 8.00% Engineering Works Consultant PLC. 97 Departure / Relief Global Relief Departed Global Relief Departed Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 5- 35: Departure from Maximum Grade for Road segment -2 Station No Grade Grade Desirable Absolute Length Maximum Maximum (m) Grade (%) Grade (%) Departure / From To (%) Relief 1 0+000.00 0+150.03 -6.00% 150.03 6.00% 8.00% 2 0+150.03 0+469.86 -8.00% 319.83 6.00% 8.00% 3 0+469.86 0+826.64 -5.86% 356.78 6.00% 8.00% 4 0+826.64 0+965.54 -11.09% 138.9 6.00% 8.00% Departed 5 0+965.54 1+119.08 1.01% 153.54 6.00% 8.00% Global Relief Global Relief Table 5- 36: Departure from Maximum Grade for Road segment -2 Station No Grade Grade Desirable Absolute Length Maximum Maximum (m) Grade (%) Grade (%) Departure / From To (%) 1 0+000.00 0+194.19 1.40% 194.19 6.00% 8.00% Global Relief 2 0+194.19 0+443.80 8.92% 249.61 6.00% 8.00% Departed 3 0+443.80 0+658.92 3.72% 215.12 6.00% 8.00% Global Relief 4 0+658.92 0+938.70 8.77% 279.78 6.00% 8.00% Departed 5 0+938.70 1+182.13 5.40% 243.43 6.00% 8.00% 6 1+182.13 1+418.33 -6.87% 236.2 6.00% 8.00% 7 1+418.33 1+538.53 0.62% 120.2 6.00% 8.00% 8 1+538.53 1+688.57 5.63% 150.04 6.00% 8.00% 9 1+688.57 1+855.55 -0.74% 166.98 6.00% 8.00% 10 1+855.55 2+073.34 4.28% 217.79 6.00% 8.00% 11 2+073.34 2+286.81 5.55% 213.47 6.00% 8.00% 12 2+286.81 2+469.97 -1.75% 183.16 6.00% 8.00% 13 2+469.97 2+632.83 -7.38% 162.86 6.00% 8.00% 14 2+632.83 2+797.02 1.09% 164.19 6.00% 8.00% 15 2+797.02 2+934.12 -2.99% 137.1 6.00% 8.00% 16 2+934.12 3+176.63 7.03% 242.51 6.00% 8.00% 17 3+176.63 3+397.01 1.21% 220.38 6.00% 8.00% 18 3+397.01 3+727.67 -8.00% 330.66 6.00% 8.00% 19 3+727.67 3+929.77 -5.50% 202.1 6.00% 8.00% 20 3+929.77 4+303.11 -2.26% 373.34 6.00% 8.00% 21 4+303.11 4+550.93 -8.00% 247.82 6.00% 8.00% Engineering Works Consultant PLC. Relief Global Relief 98 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Station No Grade Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Grade Desirable Absolute Length Maximum Maximum (m) Grade (%) Grade (%) From To (%) 22 4+550.93 4+917.51 -3.84% 366.58 6.00% 8.00% 23 4+917.51 5+135.66 -0.53% 218.15 6.00% 8.00% 24 5+135.66 5+441.21 -6.00% 305.55 6.00% 8.00% 25 5+441.21 5+749.41 -2.59% 308.2 6.00% 8.00% 26 5+749.41 5+962.59 1.61% 213.18 6.00% 8.00% 27 5+962.59 6+080.55 -7.17% 117.96 6.00% 8.00% 5.4.3 Departure / Relief Reasons and Justifications for the Requested Departures from Standard In the rugged mountainous and escarpment sections of the project route, achieving the required geometric design parameters for DC6 paved Design standard, like limiting the maximum gradient to 8%, the minimum radius of curve to 95m for urban and per urban has been difficult due to considerably high earthwork quantities, construction costs above the feasible range, significant negative environmental impacts and increased risk of cut slope instabilities and overall performance of the project road. The reasons and explanation for the requested departures from the standard have been assembled separately for the horizontal alignment and vertical alignment. The sample reasons for the requested departures from standard have also been presented in tabular forms and illustrated with extracted Plan, profiles and cross sections. Reasons for minimum radius of curves The core reason for the requested departures from minimum horizontal radius is the rugged mountainous terrains that form about 19.74% of the road section which has very sharp natural curvatures. At sharp natural curvature locations in such difficult terrains only departed sharp radii of curvatures can fit without excessive height of fill, excessive height of retaining walls, and excessive depth of cuts and associated stability problems. Furthermore, in traversing steep ascent and descent sections, the use of winding alignment with the inclusion of sharp switch back curves (hairpin bends) becomes important. The estimated depth of deep box cuts, that would be required at each curve locations if improved to minimum values are presented as one of the reasons for the requested departure from standard as shown in the figure below. Section 8.9 of ERA Geometric Design Manual 2013 states “Switchback or hairpin curves are used where necessary in traversing mountainous and escarpment terrain. Employing a radius of 20m or less, with a minimum of 10m, they are generally Engineering Works Consultant PLC. 99 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 outside of the standards for all road designs, and are specified using the guidelines listed in the Departure from Standards section in chapter 2.” Reasons for departure from maximum gradient Similar to the case for minimum radius of Horizontal Alignment, the main reasons for the requested departure from maximum gradient is the rugged mountainous and escarpment topography that form nearly 73% of the section of the project road associated with steep rise and fall sections. The major reason for departure is huge depth cuts which range from 10m to 30m and more if we make the grade continuous. These depths of cuts are excessively high with considerably high construction costs, maintenance costs, instability costs, and social and environmental costs. So, using 9% maximum grade as provided in the geometric design manual is concluded to be impractical at selected sections. The tabulated reasons for departure are illustrated with profile and cross section drawings below. Figure 5- 20: Illustration of the effects of using 8% maximum grade resulting in 11.2m deep cut at sta. 0+660 ( Road segment -1) Engineering Works Consultant PLC. 100 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Figure 5- 21: Illustration of the effects of using 9% maximum grade resulting in high fill 7.4 from sta. 2+300 to sta. 2+642 for ( Road segment -6) In design of roads through mountainous and escarpment terrains, hill side cut cross sections that flash with the ground at the valley side are mostly expected which are often in harmony with the surrounding natural topography. This can only be achieved through the use of horizontal curvatures in balance with the natural curvatures and gradients in balance with the natural topography as can be appreciated in the photo below. Engineering Works Consultant PLC. 101 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 High fill supported Deep by box cut cross Figure 5- 22: Exhibit 5.1: Fig 4.08 Mountain road in Jordan showing appropriate design in difficult conditions (Rendel Palmer & Tritton) (Source: TRL released Note titled towards Safer Roads) Despite the above harmonious design approach, we may use minimum radii of horizontal curves from standards that may be way larger than the natural ground curvatures and gentle gradients that slush through the topography. Such a design approach would result in deep box cut cross sections on the convex side of the hill and high fill embankments supported by huge retaining walls on the concave side of the hill. When the road offsets more to the valley side at the concave section of the hill due to use of larger radius curves, the height of retaining wall and fill embankment becomes excessively large. Similarly, when the road offsets more to the hill side at the convex section of the hill due to use of larger radius curves, the depth of the box cut cross sections becomes excessively large. It is also well known that deep box cut cross sections are not generally favourite cross section types in low volume road design as they have a number of disadvantages: They are not environmentally friendly as they slash through the natural topography and leave heavy construction scars resulting in steep and long roadside slopes susceptible to erosion and incapable of supporting of vegetation/plant cover and topsoil (or disfigured landscape) Engineering Works Consultant PLC. 102 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Unavoidable side-tipping of excessive spoil materials from road cuts will cause additional significant damages to the landscape, and contribute to the decrease in stability of slopes. The resulting excessive spoil material can give rise to a variety of problems including erosion of the spoil itself, the smoothening or removal of natural vegetation, instability within the spoil material itself, especially when infiltrated by water, slope overloading and resultant failure and disruption of existing runoff patterns and siltation of water courses and drainage channels and disruption of agricultural practices In addition to intrusion in landscape, deep excavation of the slope invariably disturbs the natural stability of the ground by the removal of lateral support and a change in the natural ground water conditions which may trigger slope instability problems They also take up extensive land area as the slope stake distances are very large on both sides. Such a huge land takes in such a project area where land for farming is limited due to severe topography may also have negative effect on the welfare of the local society. So keeping the radius of curvature and gradients in balance with the natural topography through the employment of departures from standards in difficult terrains would often result in a wellblended, environmentally more sustainable, economical and more stable road. 5.4.4 Mitigation Measures Even though Road design should be as forgiving as possible as a matter of good practice, Mitigation measures for design exceptions are normally investigated and considered. When mitigation is proposed as part of the design exception request, it is notified in terms of the required measures to be provided in the project. Minimum Horizontal Radius The following are the proposed mitigation measures that are believed to minimize the negative safety and serviceability concerns of sharp curves: Providing adequate traffic signs, pavement markings, and guide posts Providing guard rails at selected locations especially where sharp curves and steep grades co-exist Switch back curves Speed restriction is the main criterion to be maintained through-out switch back curves. A vehicle can negotiate 20m curve without encroaching into other traffic lanes at a design speed of about 20km/hr and lesser. The following are specific mitigation measures: Engineering Works Consultant PLC. 103 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Providing adequate traffic signs including warning and chevron traffic signs, and pavement markings, Providing guideposts with reflectors Providing guard rails at selected locations especially where switch back curves and steep grades co-exist Maximum Gradient When a gradient is more than the desirable maximum gradient, its length is limited to the maximum desirable length. Further a relief gradient of maximum 6% is provided with a minimum length of 150m. This will give heavy vehicles time to change gears and acquire momentum to negotiate the next steep gradient. This also enhances the safety of the road by decreasing the unnecessary high speeds of descending vehicles. In addition to the above geometric mitigation measures, appropriate traffic signs and pavement markings will be provided that will warn and guide drivers through the steep grade sections safely and comfortably. 5.4.5 Conclusion and Recommendations The following are concluded from the discussions in this Reasons and Justifications for departures from standards report. The main reason for the requested departures from minimum horizontal radius is to reduce the way it passes through cemeteries The majority of the ground profile vertical alignment of the project site traverses through mountainous and escarpment terrain either continuously rising (ascending) or falling (descending) which make it difficult to achieve the required standard. Anticipated geotechnical instability and increased risk of cut slope failures due to very deep cut and high fill. Inaccessibility of the road to people and animals living by the sides of the road due to the deep cut Considering the foregoing, we strongly believe that the requested departures from standards and their extents are reasonable and kindly request the approval of the proposed design along with the requested departures from the standards. Engineering Works Consultant PLC. 104 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 6 ROAD SAFETY DESIGN 6.1 Review of Existing Accident Data Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 The burden of road traffic injuries and fatalities is huge in Ethiopia. WHO’s Global status report on road safety 2013 revealed that approximately 1.24 million people die every year on the world’s roads; another 20 to 50 million sustain nonfatal injuries as a result of road traffic crashes which is the leading cause of death for young people aged between 15-29 years. A similar WHO’s status report on road safety for African region 2009 affirmed that almost 20% (n = 234 768) of global road traffic deaths occurred in the African Region which has less than 2% of the world’s registered vehicles and of all the deaths in the Region 70% occurred in the ten countries that account for 70% of the regional population: Ethiopia, Ghana, Kenya, Madagascar, Mozambique, Nigeria, South Africa, Tanzania, Uganda. The region has some of the highest rates of road traffic deaths globally at more than 32 deaths per 100,000 populations annually. According to the report, Ethiopia has 35 deaths per 100,000 populations which is among the few highest rates in the world. The traffic police reported road traffic crash data from 2003 to 2008 has been analysed and presented in a study by UN (Road safety in Africa, a case study in Ethiopia). A more recent review of police reported traffic crash data has been made by Getu. Sagne et.al. We referred to these documents to establish the current road safety statistics for the country. Table 6- 1: Motor vehicle accidents in Ethiopia, 2003/04 - 2007/08 2003/04 2004/05 2005/06 2006/07 2007/08 Total accidents 15,346 17,722 18,911 17,147 15,086 Fatal 1,630 1,801 2,029 2,047 1,802 Serious Injury 2,072 2,368 2,621 2,504 2,156 Light Injury 2,705 2,731 2,653 2,426 2,123 Property damage 10,569 10,822 11,608 10,170 9,005 Death rate per ten thousand vehicles 145 132 137 123 95 Death rate per hundred thousand population 3.10 3.13 3.51 3.41 2.84 Number of deaths 2,111 2,188 2,522 2,517 2,161 Below 18 years age 435 494 513 506 485 18-30 years age 858 791 1,139 977 689 31-50 years age 570 678 592 721 642 Above 50 years 248 225 278 313 345 Number of people injured 8,507 8,885 9,394 9,553 7,140 Below 18 years age 1,552 1,490 1,900 1,884 1,091 18-30 years age 3,703 4,429 4,352 3,847 3,025 Engineering Works Consultant PLC. 105 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Data Source: Federal Police Commission Of the total traffic accidents occurring yearly, more that 11% are fatal accidents. Over 20 % of the total traffic accident injuries are fatalities. Table 6- 2: Severity of traffic accidents in Ethiopia Ethiopian Fiscal Year Ethiopian Severity of Accidents Fatal Severity of Injuries Total % Fatal Total Total Fatalities as % Fiscal Year Accidents Accidents Accidents Fatalities Injuries of injuries 2003/4 1,630 15,346 10.6 2,111 10,618 19.9 2004/5 1,801 17,722 10.2 2,188 11,073 19.8 2005/6 2,029 18,911 10.7 2,522 11,916 21.2 2006/7 2,047 17,147 11.9 2,517 12,070 20.9 2007/8 1,802 15,086 11.9 2,161 9,301 23.2 Data Source: Federal Police Commission The majority of crashes occurred during daylight hours. Figure 6-1 shows that crashes increased rapidly from 6:00am to 7:00am. Numbers were more or less steady until 8:00 pm after which they declined in most cases, though not as steeply as the morning increase. Figure 5- 3 provides traffic volume data by hour for several important roads. Figure 6- 1: Variation in Road Traffic Crashes By Figure Time of Day, July 2005-June 2011 6- 2: Motorized Traffic Volume Time of Day on Selected Major Road Segments in 2011 (Ethiopian Roads Authority, 2012). The highest number of crashes (fatal, injury, and property damage) involved drivers in the 18 – 30year age group (45%) and in the 31-50-year age group (35%). The age range of drivers involved in crashes is shown in Table below. Engineering Works Consultant PLC. by 106 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 6- 3: Crashes by Driver Age, Education, and Gender, July 2005-June 2011 Driver Age Fatal Injury Property Total % Less than 18 342 775 766 1,883 1.8 18-30 6,005 14,182 25,624 45,811 44.5 31—50 3,853 9,027 23,491 36,371 35.3 More than 51 764 2,023 6,276 9,063 8.8 Unclassified age 1,176 3,447 5,279 9,902 9.6 Total 12,140 29,454 61,436 10,3030 100.0 Illiterate 374 607 526 1,507 1.46 Writing & reading 598 1,192 1,641 3,431 3.33 Elementary school 2,644 5,327 8,762 16,733 16.24 Junior high school 3,484 8,374 12,838 24696 23.97 High school 3,235 8,638 23,612 35,485 34.44 Above high school 1,077 2,588 9,844 13,509 13.11 Unknown 728 2,728 4,213 7,669 7.44 Total 12,140 29,454 61,436 103,030 100.00 Male 10,928 25,628 54,005 90,561 87.90 Female 684 1,462 3,534 5,680 5.51 Unclassified 528 2,364 3,897 6,789 6.59 Total 12,140 29,454 61,436 103,030 100.00 Driver Education Level Driver Gender Interstate and city roads accounted for 70.5% of fatal crashes for most of which ERA is responsible. Most of these are paved two-way two-lane roads. Table 6- 4: Road Traffic Fatality Crashes by Road Type and Road Pavement July 2005-June 2011 Road Type Twelve Month Periods (July-June) 2005/6 2006/7 2007/8 2008/9 2009/10 2010/11 Total % Interstate 728 758 768 606 473 1027 4360 35.9 Collector 211 237 238 300 375 509 1870 15.4 Access 237 327 351 224 360 215 1714 14.1 City 625 707 690 672 1003 499 4196 34.6 Total 1801 2029 2047 1802 2211 2250 12140 100 1534 1494 8144 67.1 Road Traffic Fatality Crashes by Road Pavement ( Surface) Type Asphalt roads 1237 1429 1208 Engineering Works Consultant PLC. 1242 107 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Road Type Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Twelve Month Periods (July-June) 2005/6 2006/7 2007/8 2008/9 2009/10 2010/11 Total % 76 65 66 75 221 354 857 7.1 Gravel roads 379 416 471 314 356 397 2333 19.2 Earth roads 109 119 302 171 100 5 806 6.6 Total 1801 2029 2047 1802 2211 2250 12140 100 Asphalt roads with some distress The absence of median strips or barriers also has a significant effect in increasing crashes. Usually, rural two-lane roads lack these physical barriers which separate opposing the incoming and outgoing traffic flows. Two-way, two-lane roads constitute the major proportion in of the road network in Ethiopia. Table 6- 5: Fatal and Injury Crashes in the Six Year Period by Lanes/Medians, Road Alignment, Junction Type and Illumination Conditions Fatal Crashes % Injury crashes % Lanes/Medians One way 3020 24.88 6391 21.7 Undivided Two way 7278 59.95 16631 56.46 Double carriageway ( median) 1482 12.21 5335 18.11 Two-way ( divided with solid lines road marking) 236 1.94 727 2.47 Two-way ( divided with broken lines road marking ) 124 1.02 259 0.88 Total 12140 100.00 29454 100 Tangent road with flat terrain 7,913 65.18 19832 67.33 Tangent road with mild grade and flat terrain 1,166 9.60 2797 9.50 and 348 2.87 816 2.77 Tangent road with rolling terrain 337 2.78 909 3.09 Gentle horizontal curve 587 4.84 1,325 4.50 Sharp reverse curve 525 4.32 1,069 3.63 Steep grade upward with mountainous terrain 515 4.24 990 3.36 Steep grade downward with mountainous terrain 669 5.51 1,478 5.02 Other 80 0.66 238 0.81 Total 12,140 100.00 29,454 100.00 Road Alignment Tangent road with mountainous terrain escarpments Engineering Works Consultant PLC. 108 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Fatal Crashes Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Injury % crashes % Lanes/Medians Illumination conditions Daytime with sufficient daylight 7,581 62.5 20,094 68.22 Twilight 871 7.17 2,004 6.80 Sun rising 874 7.20 1,590 5.40 Night with sufficient light 1,293 10.7 2,470 8.39 Night with insufficient light 542 4.46 1,519 5.16 Night without light 781 6.43 1,407 4.78 Other 198 1.63 370 1.26 Total 12,140 100.00 29,454 100.00 Midblock 8,565 70.55 21,977 74.61 Y-junction 1,570 12.93 2,030 6.89 T-junction 742 6.11 2,367 8.04 Roundabout 371 3.06 848 2.88 Four leg junction 539 4.44 1,600 5.43 Five leg junction 95 0.78 111 0.38 Rail crossing 34 0.28 68 0.23 Other 224 1.85 453 1.54 Total 12,140 100.00 29,454 100.00 Road junction type There are also links between different land use types and the occurrence of crashes. Analysis indicates that most fatal and injury crashes occurred in and around cities, particularly in central business districts and residential areas. Table below shows that 27.7% fatalities and 33.4% of serious injuries occurred in central business districts and residential areas in the six-year period. Table 6- 6: Crashes by Land Use Land use Fatal Crashes % Injury Crashes % Property Damage % Rural village areas 3041 25.0 4737 16.0 4334 7.1 Agriculture areas 1948 16.1 3584 12.1 4360 7.1 School areas 892 7.4 1903 6.5 2379 3.9 Industrial 355 2.9 929 3.2 1554 2.5 Church areas 462 3.8 1369 4.7 2855 4.7 Market areas 820 6.8 3147 10.8 6748 10.9 Engineering Works Consultant PLC. 109 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Land use Fatal Crashes % Injury Crashes % Property Damage % Recreational areas 562 4.6 1908 6.4 4505 7.3 Hospital areas 342 2.8 617 2.1 2552 4.2 CBD 1765 14.5 6290 21.4 24039 39.1 Urban Residential 1597 13.2 4234 14.3 6955 11.3 Other 356 2.9 736 2.5 1183 1.9 Total 12140 100 29454 100 61436 6.2 Road Safety Road safety Philosophy Road safety philosophies generally express a long-term vision of an ideal road traffic system where accidents and serious personal injury are virtually eliminated. Road "accidents" are not considered accidental events that are the inevitable consequence of our demand for mobility; they are seen as events that can be prevented. The main elements of road safety philosophies reflect generally well known safety principles. People are fallible and make errors. Furthermore, people are physically vulnerable and can only withstand a limited amount of external forces. Therefore, road safety measures based on these philosophies and principles take account of these limitations and aim to develop a road system that: Minimizes the chances of human error. Is forgiving of errors when they do occur. Prevents conflicts among road users with large differences in speed, mass and direction. The WHO world report on traffic injury prevention (WHO, 2004) sets out a number of guiding principles for road safety work which are based upon this line of thinking. It says, among other things, that: "Road crash injury is largely preventable and predictable; it is a human-made problem amenable to rational analysis. Common driving errors and common pedestrian behavior should not lead to death and serious injury – the traffic system should help users to cope with increasing demanding conditions. The vulnerability of the human body should be the limiting design parameter for the traffic system." In line with these principles, a road traffic system that is safe and sustainable will have the following features: its infrastructure will have been adapted to take into account human limitations, using proper road design; its vehicles will be equipped to make the task of driving easier and to provide a high standard of protection in crashes; Engineering Works Consultant PLC. 110 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Its road users will be provided with adequate information and education and, where appropriate, will be deterred from undesirable or dangerous behaviour. Incorporating safety features into road design A key objective of safety engineering is to make drivers naturally choose to comply with the speed limit. Through the use of self-explanatory road layouts, engineering can lead to safer road user behaviour, as well as correcting defects in road design that otherwise may lead to crashes. In line with this, a range of engineering measures are designed to encourage appropriate speed and make hazards easily perceptible. These measures include: improved vertical alignment; advisory speed limits at sharp bends; regular speed-limit signs; 6.3 Road side Furniture and Road Markings The various devices and road furniture used to control, guide, warning and regulate the traffic are termed as traffic control devices. These features include the elements intended to improve the driver's perception and comprehension of the continually changing appearance of the road. Hence, they contribute to reduction of risk of occurrence of accidents. Widely used and the most common types of traffic guide devices and furniture for road projects are: Traffic sign, Road Marking Guide posts (Marker Posts) and Guard Rail Km post The design of these facilities will be done in accordance with ERA guideline. Traffic Signs Traffic signs are of three general types: Regulatory Signs: indicate legal requirements of traffic movement and are essential for all roads. Warning Signs: indicate conditions that may be hazardous to highway users Information Signs: convey information of use to the driver Warning signs should be provided where there are unexpected changes in the driving conditions, for example where: The geometric standards for a particular class of road have been changed along a short section of road, for example a sharp bend, a sudden narrowing of the road, or an unexpectedly steep gradient;A bend occurs after a long section of straight road;There is an unexpected school Engineering Works Consultant PLC. 111 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 crossing;A drift or other structure is not clearly visible from a safe distance;The driver is approaching traffic calming measures such as speed hump. Traffic signs have been provided, depending on the requirement, as per ERA's Standard Specification 2014 and ERA's Standard Drawings 2014. Retro-reflective material engineering grade material shall conform to the requirements of ASTM D 4956 or BS 873 Part 6, Marker Posts (Guide Posts) Marker posts have the function of controlling traffic to encourage safe operation of the road. There are two types of marker posts: guideposts and kilometre posts. Guideposts are intended to make drivers aware of potential hazards such as abrupt changes in shoulder width, abrupt changes in the alignment, and approaches to structures etc. For changes in shoulder width and approaches to structures, guide posts should be placed at appropriate intervals. The required spacing of guideposts on curves according to ERA’s Geometric Design Manual-2013 is shown in Table below. Table 6- 7: Guide post Spacing Curve Radius (m) Guide Post Spacing (m) 500 35 200 20 100 12 50 8 30 5 Route marker KM posts are provided as per ERA standards at 1Km interval. Safety barriers/Guardrails Highway engineering safety is usually assumed to be optimized by linking geometric elements to a design or operating speed, so that the resulting geometry has a consistency which reduces the likelihood of a driver being presented with an unexpected situation. This concept of driver expectation forms the basis of this set of design standards. But it is not always practical or economical to provide safe slopes and curves within the standard in all section of a road. In these instance safety barriers will be required and used. Where appropriate, provision has been made to construct safety barriers from heavy masonry or concrete or steel guardrails. High quality masonry work is found in Ethiopia and local communities may benefit as a result of the labour-intensive construction method, wherever such barriers are to be constructed. Safety barriers recommended to be installed on bridge approaches at least for Engineering Works Consultant PLC. 112 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 50m on either ends and on hairpin curves. Heavy masonry guide walls(L=1.5m) recommended as guideposts in high embankments more than 3m height for mountainous sections @ 15m spacing in straight sections/ 5m on normal curves and 2m on substandard curves. In addition, concrete safety barrier “New Jersey barrier will be used” as may be required during detail design the type or selection will be done as per the standard. (Figure 6-1). Figure 6- 3: Concrete/Masonry Barrier Detail Steel Guard rail are recommended on all bridge approaches for a length of 50m on approaching side and 25m on leaving side on both side. . Engineering Works Consultant PLC. 113 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 7 PAVEMENT DESIGN 7.1 Introduction Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 The main function of a pavement is to carry traffic on a given road over the prevailing sub grade soil in a given climate condition for a specified time interval (design period). The pavement structure should therefore be structurally sound in order to serve the intended purpose for the given period without premature failure. Construction of the pavement structure should also be economically viable so that the construction of the road becomes feasible. This can be achieved by the use of best combination of locally available materials. In light of this, analysis of the traffic characteristics of the project area was carried out to determine the design traffic; and relevant data regarding the soil foundation and construction material were assessed to determine the bearing strength of the sub grade materials. The best economical combination of pavement layers (in relation to both thickness and type of materials) that suit the underlying sub grade materials and the cumulative traffic to be carried during the design life of the road is then determined. The appropriate pavement structures are selected from Low volume roads (LVR) manual, 2011. Problematic soil stretches are also treated with appropriate treatment measures. This report is therefore presents the activities carried out in relation to the design of the Pavement structures of the project in detail. 7.2 Design Standards and Departure 7.2.1 Design Standards This Report presents the pavement design of approximately 21km Road segments of the Project in Chiro town. In the report, data required for design of the pavement are obtained from soils and materials investigation and ERA Standard Technical Specification 2014, ERA Pavement Design Manual 2013, ERA Low Volume Roads Manual 2011, AASHTO V1 -1993 Pavement Design Manual and other pertinent design manuals. 7.2.2 Design Period Design period is the period during which the proposed pavement carries the estimated design traffic without major reconstruction works. Only routine and ordinary maintenance works is carried out to maintain the road to its expected minimum performance level. For most road projects, economic analysis period of between 10 and 20 years from the date of opening is considered. For the subject project a design period of 20 years from the year the road is opened to traffic i.e. (2028 - 2047) is considered for geometric design. The project road is expected to be opened to traffic in the year 2028. Engineering Works Consultant PLC. 114 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 7.3 Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Existing Pavement Condition Survey The project road condition survey has been carried out by visual observations undertaken by means of slow drive-over survey and supplemented with simple measurements. Visual assessment was carried out by driving with a speed of not exceeding 15 km/hr. and stopping at various locations, depending on variations in road conditions. The different distresses develop due to factors related to sub grade soil, traffic, the type of material used for construction and climate of the area have been identified. The extent and severity of each of the distresses was assesses and recorded. The existing road is rated using the combination of the above distresses. Depending on the level of damage, each sections of the road has been rated as very poor, fair and fair to good conditions. In addition, measurement of width of the carriageway have been carried out. The detailed site investigation along the alignment reveals that the existing gravel surface is constructed from a silty sandy GRAVEL soil and the average width of the roadway is 4.0m-12.0m. The existing road is accessible to four-wheel drive vehicles in all-weather condition except proposed new alignment. From the condition survey, it was noted that rutting, segregations, potholes, Erosions, and the use of oversize dominated gravel wearing coarse, and absence of proper side drains are the major defects of the road project. The frequency of occurrence and extent of the distresses vary from place to place depending on the nature of the gravel wearing course, condition of the drainage system, maintenance and nature of the sub grade soil, etc. The summary of the condition survey is presented in in Appendix. 7.4 Traffic Volume 7.4.1 General For effective planning and design of road projects, the knowledge of past, present and future traffic movement on the proposed project road is essential. The volume and loading pattern of the current and forecasted future traffic on any proposed road project constitutes the most important factor in determining the feasibility of any planned road project, and in fixing design standards and in estimating the construction and maintenance costs of road projects, as well. Hence, estimate of current traffic and forecast of future traffic need to be carried out before any planning and design work is undertaken. Accordingly, Traffic Count and Origin-Destination (O-D) survey on Motorized and Non-motorized traffic have been conducted for the project road as per the standard techniques outlined in the study of Economic Feasibility and Detailed Engineering Design of road projects, as given in ERA standard manual and other international standards. 7.4.2 Traffic Survey Engineering Works Consultant PLC. 115 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 A traffic count on the proposed project road, Chiro Town Internal Asphalt Design project and the road segments was conducted in end of April and Beginning of May 2023, which represents one of the traffic count periods (cycle) of ERA, i.e., Cycle 2. The count includes motorized and nonmotorized traffic, and was carried out at identified stations along the project road segments. Motorized and non-motorized Traffic counting was also conducted on existing adjacent road to assess the traffic composition in the area, and estimate the volume of traffic that can distributed as diverted traffic computation to the project road up on completion of the construction of the project. The counts were made for 12 hours, from 6:00 am to 6:00 pm, for seven consecutive days; and night counts were made for two days from 6:00 pm to 6:00 am, one of which is on a market day. 7.4.3 Traffic Survey Stations In order to capture the current traffic on the proposed route of the project, traffic count consist of motorized and non-motorized traffic were conducted at road segments as shown in the table below. The following Table below summarize the traffic survey stations, road section, duration and purpose of the Count. Table 7- 1: Traffic Survey Stations, Road Section, Duration and Purpose of the Count Survey Station type Project Location Duration Purpose Method Route survey Classified Station Road Zone 7 day (+2 Traffic on the proposed Manual Motorized 1 segment Secretory night) road project corridor(For count 6 and 7 office count AADT-pavement design, Count economic analysis, Design standard...) Station Road Wereda 7 day (+2 Traffic for the proposed Manual 2 segment administration night) road project corridor to count count consider 2 and 3 as a continuous traffic And Distribution traffic estimation for road project corridor(For AADT-pavement design, economic analysis, Design standard...) Station For all hiro 3(Major Road road) segment general 7 day (+2 hospital Engineering Works Consultant PLC. Distribution traffic Manual night) estimation for road count count project corridor(For 116 of Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Survey Station type Project Location Duration Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Purpose Method Route survey AADT-pavement design, economic analysis, Design standard...) Station Road JFM 7 day (+2 Traffic for the proposed Manual 4 segment petroleum night) road project corridor to count count consider 4,5 and 1,9,8 as a continuous traffic (For AADT-pavement design, economic analysis, Design standard...) 7.4.4 Vehicle Classification For detailed engineering design purpose, vehicles were classified into passenger and freightdepending on the type of service they render. Passenger vehicles were further classified into Car, Land Rover, Small Bus, Medium Bus and Large Bus, and freight vehicles were classified as Small Trucks, Medium Trucks, Heavy Trucks and Truck Trailer based on their respective capacity to carry load and in accordance with ERA’s Vehicle Classification System. Accordingly, nine vehicle categories were used for the purpose of road side traffic count as listed below. Table 7- 2: Vehicle Classification Vehicle Type Description Car Small automobiles Land Rover 4WD and utility vehicles Small Bus Passenger cars up to 25 seats. Medium Bus Passenger cars above 25 seats and below 45 seats Large Bus Passenger cars above 45 seats. Small Truck Light goods vehicles and delivery vans up to 3.5 tons load. Medium Truck Goods vehicle with 3.5 – 7.5 tons load. Heavy Truck Trucks above 7.5 tons load. Truck and Trailer Trucks with trailer or semi-trailer and Tanker trailer. 7.4.5 Traffic Count and Analysis Motorized Traffic Count (Day Time) As discussed above, Motorized Traffic Count was conducted for Seven days (12 hours) during day time at the stations mentioned above. The volume of traffic obtained is then summed up to get the total number of traffic in the week, and then divided by seven to obtain the average daily day time Engineering Works Consultant PLC. 117 of Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 traffic. See table 7.3 to 7.6 below gives the sum and average of seven days’ traffic by vehicle category at the respective station count location. Table 7- 3: Day Time Traffic Count Survey Result: Station 1 Day count (Chiro Town Administration-Mtichu) Both directions sum @ st-1 survey location (7 days day count) Day Date Car 4WD Bajaj S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total 1 28/04/2023 0 59 283 0 0 1 1 0 0 0 344 2 29/04/2023 0 30 347 0 0 0 11 4 2 0 394 3 30/04/2023 2 29 312 4 0 0 0 1 0 0 348 4 05/01/23 2 28 336 0 0 0 4 3 1 0 374 5 05/02/23 0 21 340 6 0 0 0 0 4 0 371 6 05/03/23 0 22 343 0 0 0 5 0 1 0 371 7 05/04/23 1 57 579 5 2 1 12 1 3 0 661 Total 5 246 2540 15 2 2 33 9 11 0 2863 Average 1 35 363 2 0 0 5 1 2 0 409 Table 7- 4: Day Time Traffic Count Survey Result: Station 2 Day count (Chiro Wereda Office-Chiro Peace Mosque) Both directions sum @ st-2 survey location (7 days day count) Car 4WD Bajaj S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Total Trailer Day Date 1 28/04/2023 45 373 5856 143 46 14 56 8 19 0 6560 2 29/04/2023 48 500 9900 141 66 32 68 23 6 3 10787 3 30/04/2023 44 498 8990 147 62 12 47 16 11 1 9828 4 05/01/23 52 711 7400 318 127 40 95 28 10 4 8785 5 05/02/23 58 573 8010 215 61 23 86 24 22 2 9074 6 05/03/23 104 900 10099 451 200 46 127 49 25 9 12010 7 05/04/23 150 1167 6902 729 197 92 162 59 22 24 9504 Total 501 4722 57157 2144 759 259 641 207 115 43 66548 Average 72 675 108 37 92 30 16 6 9507 8165 306 Engineering Works Consultant PLC. 118 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 7- 5: Day Time Traffic Count Survey Result: Station 3 Day count (Chiro town -Addis Ababa) Both directions sum @ st-3 survey location (7 days day count) Car Day Date 4WD Bajaj S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total 1 28/04/2023 51 666 2401 214 119 41 84 175 57 897 4705 2 29/04/2023 91 814 4500 240 224 56 99 108 63 558 6753 3 30/04/2023 61 762 4499 222 231 46 144 100 77 614 6756 4 05/01/23 53 618 4414 277 220 54 96 59 71 469 6331 5 05/02/23 34 523 5140 307 195 66 114 69 155 353 6956 6 05/03/23 31 549 5280 245 195 81 187 111 187 390 7256 7 28/04/2023 51 555 6860 208 149 89 146 103 146 1137 9444 Total 372 4487 33094 1713 1333 433 870 725 756 4418 48201 Average 53 190 62 124 104 108 631 6886 641 4728 245 Table 7- 6: Day Time Traffic Count Survey Result: Station 4 Day count (Agape Hotel-Agri Reserch Center) Both directions sum @ st-4 survey location (7 days day count) Car 4WD Day Date Bajaj S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total 1 28/04/2023 22 51 376 23 2 1 13 11 6 1 506 2 29/04/2023 46 44 363 16 1 0 12 7 6 0 495 3 30/04/2023 11 47 362 15 7 3 15 9 6 0 475 4 05/01/23 18 81 339 12 2 0 6 4 5 0 467 5 05/02/23 5 78 398 11 1 0 10 5 4 0 512 6 05/03/23 1 75 342 2 3 0 7 1 2 0 433 7 05/04/23 20 83 320 27 7 1 16 17 4 0 495 Total 123 459 2500 106 23 5 79 54 33 1 3383 Average 18 357 3 1 11 8 5 0 483 66 15 Night Time Motorized Traffic Count Likewise, Motorized Traffic Count was conducted for two days (12 hours) during night time at the stations mentioned above. The volume of traffic obtained is then summed up to get the total number of traffic in the two days, and then divided by two to obtain the average daily night time traffic. See Table 7.7 and 7.10 below gives the sum and average of the two days’ traffic by vehicle category at the respective station count location. Engineering Works Consultant PLC. 119 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 7- 7: Night Time Traffic Count Survey Result: Station 1 Night count (Chiro Town Administration-Mtichu )Both direction @ Station 1 survey location (2 days night count) Car 4WD Bajaj S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Total Trailer Day Date 1 30/04/2023 0 7 78 1 0 0 0 1 0 0 87 2 02/05/2023 0 5 85 2 0 0 0 0 1 0 93 Table 7- 8: Night Time Traffic Count Survey Result: Station 2 Night count (Chiro Wereda Office-Chiro Peace Mosque) Both direction @ Station 2 survey location (2 days night count) Car 4WD Bajaj S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Total Trailer Day Date 1 30/04/2023 10 108 816 34 10 0 9 2 2 1 992 2 05/02/2023 15 73 1191 44 9 1 19 5 1 2 1360 Table 7- 9: Night Time Traffic Count Survey Result: Station 3 Night count (Chiro town -Addis Ababa) Both direction @ Station 3 survey location (2 days night count) Car 4WD Bajaj S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Total Trailer Day Date 1 30/04/2023 22 179 902 124 54 18 73 99 67 185 1723 2 05/02/2023 17 121 1010 183 35 19 95 63 66 120 1729 Table 7- 10: Night Time Traffic Count Survey Result: Station 4 Night count (Agape Hotel-Agri Reserch Center) Both direction @ Station 4 survey location (2 days night count) Car 4WD Bajaj S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Total Trailer Day Date 1 30/04/2023 4 17 26 14 3 0 4 0 3 0 71 2 05/02/2023 2 13 6 6 7 0 6 2 2 0 44 Engineering Works Consultant PLC. 120 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Night Factor (NF) Night factor is computed by dividing the average 24-hour traffic of the two days when the night time traffic has been count by 12-hour day time traffic of the same days. See table 1.11 to .1.14 below gives the Night Factor by vehicle category at the respective station count location. Table 7- 11: Night Factor: Station 1 Night factor @ station 1 Car Date 4WD Bajaj S/Bus M/Bus L/Bus M/Truck H/Truck Track S/Truck Trailer Shift Total 30/04/2023 Day 2 29 312 4 0 0 0 1 0 0 348 Night 0 7 78 1 0 0 0 1 0 0 87 2 36 390 5 0 0 0 2 0 0 435 Day 0 21 340 6 0 0 0 0 4 0 371 Night 0 5 85 2 0 0 0 0 1 0 93 0 26 425 8 0 0 0 0 5 0 464 24hrs 1 31 408 7 0 0 0 1 3 0 450 Total 2/05/2023 Total Average count Determination of Average Day Time count (2 days) 30/04/2023 Day 2 29 312 4 0 0 0 1 0 0 348 2/05/2023 0 21 340 6 0 0 0 0 4 0 371 1 25 326 5 0 0 0 1 2 0 360 1.25 1.30 1.00 1.00 1.00 2.00 1.25 1.00 Day Average Day Time Traffic (7day) Night Factor 1.00 1.24 Table 7- 12: Night Factor: Station 2 Night factor @ station 2 Car Date H/Truck Track Trailer Shift 30/04/2023 Day Total 44 498 8990 147 62 12 47 16 11 1 9828 Night 10 108 816 34 10 0 9 2 2 1 992 54 606 9806 181 72 12 56 18 13 2 10820 58 573 8010 215 61 23 86 24 22 2 9074 Total 2/05/2023 4WD Bajaj S/Bus M/Bus L/Bus S/Truck M/Truck Day Engineering Works Consultant PLC. 121 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Night factor @ station 2 Car Date 4WD Bajaj S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Shift Night 15 73 1191 44 9 1 19 5 1 2 1360 73 646 9201 259 70 24 105 29 23 4 10434 24hrs 64 626 9504 220 71 18 81 24 18 3 10627 Total Average Total count Determination of Average Day Time count (2 days) 30/04/2023 Day 44 498 8990 147 62 12 47 16 11 1 9828 2/05/2023 58 573 8010 215 61 23 86 24 22 2 9074 51 536 8500 181 62 18 67 20 17 2 9451 1.12 1.15 1.03 1.21 1.18 1.09 2.00 Day Average day time count(B) Night factor(A/B) 1.25 1.17 1.22 Table 7- 13: Night Factor: Station 3 Night factor @ station 3 Car Date H/Truck Track Trailer Shift 30/04/2023 Day 2/05/2023 Total 61 762 4499 222 231 46 144 100 77 614 6756 Night 22 179 902 124 54 18 73 99 67 185 1723 83 941 5401 346 285 64 217 199 144 799 8479 34 523 5140 307 195 66 114 69 155 353 6956 Night 17 121 1010 183 35 19 95 63 66 120 1729 51 644 6150 490 230 85 209 132 221 473 8685 67 793 5776 418 258 75 213 166 183 636 8582 Total Day Total Average 4WD Bajaj S/Bus M/Bus L/Bus S/Truck M/Truck 24hrs count Determination of Average Day Time count (2 days) 30/04/2023 Day 61 762 4499 222 231 46 144 100 77 614 6756 2/05/2023 34 523 5140 307 195 66 114 69 155 353 6956 48 643 4820 265 213 56 129 85 116 484 6856 1.20 1.21 1.33 1.65 1.96 1.57 1.32 1.41 Day Average Day Time Traffic (7day) Night Factor 1.41 1.23 1.58 Engineering Works Consultant PLC. 122 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 7- 14: Night Factor: Station 4 Night factor @ station 4 Car Date 4WD Bajaj S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Shift 30/04/2023 Day 11 47 362 15 7 3 15 9 6 0 475 Night 4 17 26 14 3 0 4 0 3 0 71 15 64 388 29 10 3 19 9 9 0 546 5 78 398 11 1 0 10 5 4 0 512 Night 2 13 6 6 7 0 4 2 2 0 42 7 91 404 17 8 0 14 7 6 0 554 11 78 396 23 9 2 17 8 8 0 550 Total 2/05/2023 Day Total Average Total 24hrs count(A) Determination of Average Day Time count (2 days) 30/04/2023 Day 11 47 362 15 7 3 15 9 6 0 475 1/05/2023 5 78 398 11 1 0 10 5 4 0 512 8 63 380 13 4 2 13 7 5 0 494 1.04 1.77 2.25 1.00 1.32 1.14 1.50 1.00 Day Average day time count(B) Night factor(A/B) 1.38 1.24 Motorized Average Daily Traffic (ADT) The ADT at each traffic count station can then be computed by multiplying the average day time traffic by night factor, as given in Table 3-15 above. 3-18 below summarizes the ADT at the station count location. Table 7- 15: Motorized Average Daily Traffic (ADT): Station 1 Average daily traffic @ Station 1 survey location Car 4WD Bajaj S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Total Trailer Average Day Time Traffic (7day) Night factor 1 35 363 2 0 0 5 1 2 0 1.00 1.24 1.25 1.30 1.00 1.00 1.00 2.00 1.25 1.00 44 454 3 0 0 5 3 2 0 Average daily time 1 Engineering Works Consultant PLC. 123 409 510 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Average daily traffic @ Station 1 survey location Car 4WD Bajaj S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Total Trailer (ADT) Table 7- 16: Motorized Average Daily Traffic (ADT): Station 2 Average daily traffic @ Station 2 survey location Car 4WD Bajaj S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Total Trailer Average Day Time Traffic (7day) Night factor Average daily time (ADT) 72 675 8165 306 108 37 92 30 16 6 1.25 1.17 1.12 1.22 1.15 1.03 1.21 1.18 1.09 2.00 89 789 9129 372 125 38 111 35 18 12 9507 10718 Table 7- 17: Motorized Average Daily Traffic (ADT): Station 3 Average daily traffic @ Station 3 survey location Car 4WD Bajaj S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Total Trailer Average Time Day Traffic 53 641 4728 245 190 62 124 104 108 631 1.41 1.23 1.20 1.58 1.21 1.33 1.65 1.96 1.57 1.32 75 791 5666 387 230 82 205 203 170 830 6886 (7day) Night factor Average daily time (ADT) 8639 Table 7- 18: Motorized Average Daily Traffic (ADT): Station 4 Average daily traffic @ Station 4 survey location Car 4WD Bajaj S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Total Trailer Average Time Day Traffic 18 66 357 15 3 Engineering Works Consultant PLC. 1 11 8 5 0 124 483 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 (7day) Night factor Average daily time (ADT) 1.38 1.24 1.04 1.77 2.25 1.00 1.32 1.14 1.50 1.00 24 81 372 27 7 1 15 9 7 0 543 Non -Motorized Traffic (Day Time) Non-Motorized Traffic Count was also conducted for Seven days (12 hours) during day time at the stations mentioned above. The volume of traffic obtained is then summed up to get the total number of traffic in the week, and then divided by seven to obtain the average daily day time traffic. table 319 to 3-22 below gives the sum and average of seven days’ traffic by vehicle category at the station count location. Table 7- 19: Day Time Non-motorized Traffic survey result: Station 1 Motorcycle Animal Cart Date Total 28/04/2023 17 0 17 29/04/2023 29 0 29 30/04/2023 23 0 23 05/01/23 20 0 20 05/02/23 28 0 28 05/03/23 41 0 41 05/04/23 43 0 43 Total 201 0 201 Average 29 0 29 Table 7- 20: Day Time Non-motorized Traffic survey result: Station 2 Motorcycle Animal Cart Date 28/04/2023 29/04/2023 30/04/2023 05/01/23 05/02/23 05/03/23 05/04/23 Total Average Total 119 132 101 155 256 292 650 1705 244 20 44 48 41 33 82 61 329 47 139 176 149 196 289 374 711 2034 291 Engineering Works Consultant PLC. 125 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 7- 21: Day Time Non-motorized Traffic survey result: Station 3 Motorcycle Animal Cart Date Total 28/04/2023 10 333 323 29/04/2023 4 180 176 30/04/2023 18 127 109 05/01/23 6 111 105 05/02/23 8 138 130 05/03/23 3 87 84 05/04/23 161 1 162 Total 1088 50 1138 Average 155 7 163 Table 7- 22: Day Time Non-motorized Traffic survey result: Station 4 Motorcycle Animal Cart Date Total 28/04/2023 45 0 45 29/04/2023 83 0 83 30/04/2023 74 0 74 05/01/23 90 0 90 05/02/23 71 1 72 05/03/23 44 1 45 05/04/23 73 5 78 Total 201 0 487 Average 69 1 70 Non -Motorized Traffic (Night Time) Likewise, Non-Motorized Traffic Count was conducted for two days (12 hours) during night time at the stations mentioned above. The volume of traffic obtained is then summed up to get the total number of traffic in the two days, and then divided by two to obtain the average daily night time traffic. table 3-23 to 3-26 below gives the sum and average of the two days’ traffic by NMT category at the respective road sections. Table 7- 23: Night Time Non-motorized Traffic survey result: Station 1 Motorcycle Night Animal Cart Date Total 30/04/2023 11 0 Engineering Works Consultant PLC. 11 126 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 02/05/2023 14 0 Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 14 Table 7- 24: Night Time Non-motorized Traffic survey result: Station 2 Motorcycle Animal Cart Date Total Night 30/04/2023 13 4 17 02/05/2023 22 1 23 Table 7- 25: Night Time Non-motorized Traffic survey result: Station 3 Motorcycle Animal Cart Date Total Night 30/04/2023 8 4 12 02/05/2023 26 0 26 Table 7- 26: Night Time Non-motorized Traffic survey result: Station 4 Motorcycle Animal Cart Date Total Night 30/04/2023 9 0 9 02/05/2023 5 0 5 Night Factor (NF) Computation Night factor is computed by dividing the total 24-hour traffic by 12-hour day time traffic. Tables below gives the Night Factor by NMT category at the respective road sections. Night factor is computed by dividing the total 24-hour traffic by 12-hour day time traffic. table 3-27to 3-30 below gives the Night Factor by NMT category at the respective road sections. Table 7- 27: Night Factor: @ station 1 Motorcycle Date 30/04/2023 Animal Cart Shift Total Day 23 Night 11 0 0 Engineering Works Consultant PLC. 23 11 127 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Motorcycle Date Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Animal Cart Shift Total Total 34 0 34 Day 28 0 28 night 14 0 14 Total 42 0 42 Average 24 hrs. count 38 0 38 30/04/2020 Day 23 10 23 02/05/2020 Day 28 10 28 Average Day Time Count 26 0 26 Average 24 hrs. count 38 0 26 Average Day Time Count 26 0 26 Night Factor 1.49 1 02/05/2023 Table 7- 28: Night Factor: @ station 2 Motorcycle Date Animal Cart Shift Total Day 101 48 149 Night 13 4 17 114 52 166 Day 256 33 289 night 22 1 23 Total 278 34 312 Average 24 hrs. count 196 43 239 30/04/2020 Day 101 48 149 02/05/2020 Day 256 33 289 Average Day Time Count 179 43 219 Average 24 hrs. count 196 43 239 Average Day Time Count 179 43 219 Night Factor 1.1 1.06 30/04/2023 Total 02/05/2023 Table 7- 29: Night Factor: @ station 3 Motorcycle Date Animal Cart Shift Total Engineering Works Consultant PLC. 128 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Motorcycle Date Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Animal Cart Shift Total Day 109 18 127 Night 8 4 12 117 22 139 Day 130 8 138 Night 26 0 26 Total 156 8 164 Average 24 hrs. count 137 15 152 30/04/2023 Day 109 18 127 02/05/2023 Day 130 8 138 Average Day Time Count 120 13 133 Average 24 hrs. count 137 15 152 Average Day Time Count 120 13 133 Night Factor 1.14 1.15 30/04/2020 Total 02/05/2020 Table 7- 30: Night Factor: @ station 4 Motorcycle Date Animal Cart Shift Total Day 74 0 74 Night 9 0 9 83 0 83 Day 71 1 72 night 5 0 5 Total 76 1 77 Average 24 hrs. count 80 1 80 30/04/2023 Day 74 0 74 02/05/2023 Day 71 1 72 Average Day Time Count 73 1 73 Average 24 hrs. count 80 1 80 Average Day Time Count 73 1 73 Night Factor 1.10 1 30/04/2025 Total 02/05/2023 Non-Motorized Average Daily Traffic Engineering Works Consultant PLC. 129 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 The ADT at each traffic count station can then be computed by multiplying the average day time traffic by night factor as given in table 3-31 above. table 3-34 below summarizes the ADT at the respective stations. Table 7- 31: Non-Motorized Average Daily Traffic (ADT)-Station 1 Station 1 Average Daily Traffic motorcycle Animal Cart Total 0 29 Average Day time count (7day) 29 0 1.49 Night Factor 0 43 43 Average Daily Traffic (ADT) Table 7- 32: Non-Motorized Average Daily Traffic (ADT)-Station 2 Station 2 Average Daily Traffic motorcycle Animal Cart Total 47 291 Average Day time count (7day) 244 1.10 1.06 Night Factor 267 317 Average Daily Traffic (ADT) 50 Table 7- 33: Non-Motorized Average Daily Traffic (ADT)-Station 3 Station 3 Average Daily Traffic motorcycle Animal Cart Total 7 163 Average Day time count (7day) 155 1.14 1.15 Night Factor 178 186 Average Daily Traffic (ADT) 8 Table 7- 34: Non-Motorized Average Daily Traffic (ADT)-Station 4 Station 4 Average Daily Traffic motorcycle Animal Cart Total 1 70 Average Day time count (7day) 69 1.10 1.00 Night Factor 75 76 Average Daily Traffic (ADT) 1 Modal Shift (From Non-Motorized to Motorized Traffic) Engineering Works Consultant PLC. 130 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 7.4.5.9.1 Assumptions for converting Non -Motorized Traffic to Motorized traffic A. Freight Traffic Animal carts are commonly used in the project area to bring various freight products to market centers. Most of this traffic will transfer to vehicular traffic once the proposed road is opened to traffic. Considering the fact that the proposed road project is in a poor condition and the community in the project area have been suffering from lack of proper road infrastructure, it is envisaged that most of the current non-motorized mode of transport will divert to motorized mode of transport. Considering the current road condition which deprived motorized vehicles to use the road, and status of the socio-economic profile of the area, it is assumed that 50% of the current non-motorized freight traffic may shift to motorized freight traffic within one to two years of opening of the project road to traffic. It is also assumed that a national average of 80 kg for a unit of animal-based freight transport (ABFT) and 400kg for a unit of animal cart freight (ACFT) can be considered for the prediction of the volume of motorized freight traffic. Furthermore, from the traffic composition of the project road it is noted that small trucks are the main means of freight transport, and hence the non-motorized freight traffic is expected to be converted to small trucks. B. Passenger Traffic Similarly, considering the facts mentioned above for freight transport, it is assumed that 50% of the current non-motorized passenger movement(motorcycles) may shift to motorized traffic within one to two years of opening of the project road to traffic. In estimating number of passengers, the motorcycles are assumed to carry 1.5 passengers per motorcycle, as some motorcycles are observed to carry 1 passenger and some carry 2 passengers. From the traffic composition of the project road, it is noted that medium buses are the main means of passenger transport, and hence the non-motorized passenger traffic is expected to be converted to medium busses. Using the above assumptions, the volume of motorized traffic has been computed as shown in the following. Table 7- 35: Modal shift Traffic Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total 0 2 Location Station 1 0 0 2 0 Engineering Works Consultant PLC. 0 0 0 0 131 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Station 2 0 0 0 8 0 3 0 0 0 11 Station 3 0 0 0 5 0 1 0 0 0 6 Station 4 0 0 0 3 0 1 0 0 0 4 Summary of Normal Traffic Normal Traffic is the current traffic on the road which includes motorized and non-motorized traffic, which are obtained by direct count on the project road. Based on ERA geometric design manual to defined the design standard purpose three-wheeler(bajaj) is converted to passenger car unit (PCU=0.4*Bajaj). The following gives the summary of the traffics. Table 7- 36: Summary of Normal Traffic – Station 1 Station-1- Determination of Normal Traffic Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track +Bajaj Total Trailer Converted to PCU Average Daily 182 44 3 0 0 Traffic (ADT) Modal Shift 0 0 0 2 0 ADT + Modal 182 44 3 2 0 Shift Table 7- 37: Summary of Normal Traffic – Station 2 5 3 2 0 238 0 0 0 0 2 5 3 2 0 240 Station-2- Determination of Normal Traffic Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track +Bajaj Total Trailer Converted to PCU Average Daily 3741 789 372 125 38 Traffic (ADT) Modal Shift 0 0 0 8 0 ADT + Modal 3741 789 372 133 38 Shift Table 7- 38: Summary of Normal Traffic – Station 3 111 35 18 12 5241 3 0 0 0 11 114 35 18 12 5252 Station-3- Determination of Normal Traffic Engineering Works Consultant PLC. 132 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Car Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track +Bajaj Total Trailer Converted to PCU Average Daily 2341 791 387 230 82 Traffic (ADT) Modal Shift 0 0 0 5 0 ADT + Modal 2341 791 387 235 82 Shift Table 7- 39: Summary of Normal Traffic – Station 4 205 203 170 830 5239 1 0 0 0 6 206 203 170 830 5245 Station-4- Determination of Normal Traffic Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track +Bajaj Total Trailer Converted to PCU Average Daily 173 81 27 7 Traffic (ADT) Modal Shift 0 0 0 3 ADT + Modal 173 81 27 10 Shift Origin Destination (O-D) Survey 1 15 9 7 0 320 0 1 0 0 0 4 1 16 9 7 0 324 Diverted traffic computed on the project road segments by assuming the traffic distribution on the town as road network. The potential diverted traffic is computed from parallel adjacent existing route as road network the traffic will be distributed. Table 7- 40: Potential Distributed Traffic to the project roads assumptions Traffic station TC 2 TC 3 TC 4 Distribution Direction Chiro Wereda % of distribution S-2 20% Passenger Car and 40% trucks Office- S-3 Chiro Peace Mosque Chiro town -Addis ababa Agape road segments 20% S-1-1 20% S-1-2 30% S-5 10% for Passenger car, Small and medium truck S-1-1 50% Hotel-Agri Reserch Center Engineering Works Consultant PLC. 133 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 7- 41: Potential Distributed Traffic to the project roads from Station 2 (Wereda Administration) Road segment 2 Source; Consultant Table 7- 42: Potential Distributed Traffic to the project roads from Station 2 (Wereda Administration) Road segment 3 Table 7- 43: Potential Distributed Traffic to the project roads from Station 2 (Wereda Administration) Road segment 1-1 Table 7- 44: Potential Distributed Traffic to the project roads from Station 2 (Wereda Administration) Road segment 1-2 Engineering Works Consultant PLC. 134 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 7- 45: Potential Distributed Traffic to the project roads from Station 4 (Agape Hotel) Road segment 1-1 Source; Consultant Table 7- 46: Potential Distributed Traffic to the project roads from Station 3(Main trunk road) Source; Consultant 7.4.6 Generated Traffic Normal Generated Traffic Once the project road is realized, it is assumed that the traffic to be generated is triggered by decrease in transport cost subsequent to the improvement in the condition of the road. The improvement which involves improvement in geometric and pavement feature of the road, are expected to result in increased demand for transportation, and hence more vehicles will be induced to the project road. The existing road along the project route is in very poor condition. Considering the current situation, the construction of the project road is expected to stimulate generation of trips in vehicular transport which will enhance access to markets and various service centres in the vicinity of the project. The recommended approach to forecasting generated traffic is to use demand relationships which show how traffic increases as the cost of a journey decreases. Studies carried out in similar countries give an average for the price elasticity of demand for transport of about -1.0. This means that a one per cent decrease in transport costs leads to a one per cent increase in traffic. This is extra traffic over and above the increase in normal traffic. However, Handy and Boarnet (2014) performed a critical evaluation of various induced travel studies and found that short-run elasticity effect of road development generally range from 0.3 to 0.6. (Generated Traffic and Induced Travel Implication for Transport Planning, 2015). Engineering Works Consultant PLC. 135 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 The estimation of generated traffic is based on estimating the shape of the demand function, which is expressed as an elasticity of demand. It shows the responsiveness of demand to a change in cost, which in turn is a response of change in the travel time. In the case of generated traffic, the demand for transport is related to expected reductions in journey costs and travel time. For this analysis, savings in travel time is used to determine the percent of generated traffic based on travel time with and without the project using the formula: seasonal factor Generated Traffic Factor = β [(Cijp / Cijb) – 1] Where: β is the elasticity; Cijp is the with-project travel cost; Cijb is the base case, without project travel cost; Table 7- 47: Travel time to estimate Generated Traffic Factor Without Project With Project Length Speed1 Travel Station (km) (km/hr ) (min) Station 1 2.31 20 Station 4 0.588 20 Time Length Speed1 Travel Time (km) (km/hr ) (min) 6.93 2.31 50 3 1.764 0.588 50 1 Table 3-47: Station 1-Estimate of Generated Traffic Factors from the travel time With Project (Upgrading of existing Road Station Station 1 Parameter to gravel Road) Low Medium High β (elasticity) -0.3 -0.45 -0.6 Cijp (time in minutes) 3 3 3 Cijb (time in minutes) 6.93 6.93 6.93 Generated Traffic Factor (GTF) 0.18 0.27 0.36 The above shows that the generated traffic factor is 0.18 for low scenario, 0.27 for medium scenario and 0.36 for high scenario. Table 7- 48: Station 4-Estimate of Generated Traffic Factors from the travel time With Project (Upgrading of existing Road Section Parameter β (elasticity) Engineering Works Consultant PLC. Road to gravel Road) Low Medium High -0.3 -0.45 -0.6 136 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Station 4 Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Cijp (time in minutes) 1 1 1 Cijb (time in minutes) 1.764 1.764 1.764 Generated Traffic Factor (GTF) 0.18 0.27 0.36 The above shows that the generated traffic factor is 0.18 for low scenario, 0.27 for medium scenario and 0.36 for high scenario. Traffic generation also depends on the economic activity in the area, and the level of development and the status of the living condition of the people in the area. If the economic activity is low, and the development and living condition of the people in the area is in low level, the demand for transportation will be less. Considering the current development level of the project area, it is envisaged that the level of traffic generation falls in the medium to high scenario. Hence, it is assumed that 27 % of normal traffic volume will generate within four to five years of the opening of the project. Table 7- 49: Station 1-Potential Generated Traffic for Project Road (taking medium scenario) ADT, Station 1 Generated traffic 27% Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total 182 44 3 2 0 5 3 2 0 240 49 12 1 1 0 1 1 1 0 65 Table 3- 50: Station 4-Potential Generated Traffic for Project Road (taking medium scenario) ADT, Station 4 Generated traffic 27% Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total 173 81 27 10 1 16 9 7 0 324 47 22 7 3 0 4 2 2 0 88 Seasonal Conversion Factor The ADT computed from the traffic count conducted by the Consultant represent the traffic movement on the existing adjacent roads during the time of traffic count, which is at End of April and Beginning of May 2023. However, this ADT does not show the annual average daily traffic movement on the project road in a particular year. Traffic volumes can have large daily, weekly, monthly and seasonal variations. Variation from month to month (seasonal variation) can be minimized by repeating the weekly traffic count at intervals during a year. For this purpose, ERA is Engineering Works Consultant PLC. 137 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 conducting traffic count at all traffic count stations in the country three times a year. The seasonal conversion factor is therefore calculated from the data obtained from ERA for Mieso to Asebe Teferi project road and the ADT is adjusted accordingly to take the seasonal variation into account. The following give the average annual daily traffic and the average daily traffic at cycle 2 of ERA annual traffic count cycle on Mieso to Asebe Teferi project road 2014,2015, 2017,2019 & 2020 by vehicle class. The traffic count was conducted in the month of End of April and Beginning of May 2023., which falls in the second cycle of ERA’s yearly traffic count. Hence, the seasonal conversion factor has been calculated with reference to the second cycle by dividing the average AADT by the average third cycle. Table 7- 50: Seasonal Conversion Factor Mieso to Asebe Teferi 2014 Cars LDV S/Bus L/Bus S/Truck M/Truck H/Truck T&T Cycle 1 40 154 242 72 128 227 106 98 1067 Cycle 2 11 95 334 125 103 213 138 206 1225 Cycle 3 16 103 221 83 126 118 111 89 867 AADT 2014 22 117 266 93 119 186 118 131 1053 2015 Cars LDV S/Bus L/Bus S/Truck M/Truck H/Truck T&T Cycle 1 23 229 233 76 180 149 142 131 1163 Cycle 2 27 210 269 90 161 140 119 109 1125 Cycle 3 27 210 269 90 161 140 119 109 1125 AADT 2015 26 216 257 85 167 143 127 116 1138 2017 Cars LDV S/Bus L/Bus S/Truck M/Truck H/Truck T&T Cycle 1 22 121 209 124 190 208 212 157 1243 Cycle 2 29 118 156 100 128 132 69 100 832 Cycle 3 22 73 101 51 80 102 137 234 800 AADT 2017 24 104 155 92 133 147 139 164 958 2019 Cars LDV S/Bus L/Bus S/Truck M/Truck H/Truck T&T Cycle 1 31 110 375 198 134 230 399 770 2247 Cycle 2 36 271 294 135 210 137 226 562 1871 Cycle 3 21 83 137 45 100 180 146 217 929 AADT 2019 29 155 269 126 148 182 257 516 1682 2020 Cars LDV S/Bus L/Bus S/Truck M/Truck H/Truck T&T Cycle 1 15 94 183 57 93 163 62 168 835 Cycle 2 15 94 183 57 93 163 62 168 835 Cycle 3 52 284 345 128 293 334 368 591 2395 Engineering Works Consultant PLC. 138 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 AADT 2020 27 157 237 81 160 220 164 309 1355 Average (AADT) 26 150 237 95 145 176 161 247 1237 Average Cycle-2 22 158 258 106 151 172 151 240 1260 0.95 0.92 0.90 0.96 1.02 1.06 1.03 SCF = Av. AADT/Av. Cycle 1.16 2 traffic AADT of the Project Road at 2020 (AADT0) AADT is the Annual Average Traffic for a particular road, and is obtained by multiplying the ADT obtained from actual traffic count for a week by the SCF. Table 7- 51: AADT of the Normal Traffic at 2023–Station 1 Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total 182 44 3 2 0 5 3 2 0 240 49 12 1 1 0 1 1 1 0 65 ADT(NT+DT+GT) 231 55 4 3 0 6 3 2 0 305 SCF 1.16 0.95 0.92 0.91 0.90 0.96 1.02 1.06 1.03 AADT 269 52 3 3 0 6 3 3 0 Normal Traffic Normal Generated Traffic 339 Table 7- 52: AADT of the Normal Traffic at 2023–Station 4 Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total 173 81 27 10 1 16 9 7 0 324 47 22 7 3 0 4 2 2 0 88 ADT(NT+DT+GT) 220 103 34 13 1 20 11 9 0 412 SCF 1.16 0.95 0.92 0.91 0.90 0.96 1.02 1.06 1.03 AADT 255 98 31 12 1 19 11 10 0 Normal Traffic Normal Generated Traffic 7.4.7 Traffic Growth and Forecast Design Period Design period is the period during which the proposed pavement carries the estimated design traffic without major reconstruction works. Only routine and ordinary maintenance works is carried out to maintain the road to its expected minimum performance level. Engineering Works Consultant PLC. 139 438 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 For most road projects, economic analysis period of between 10 and 20 years from the date of opening is considered. For the subject project a design period of 20 years from the year the road is opened to traffic i.e. (2028 - 2047) is considered for geometric design. The project road is expected to be opened to traffic in the year 2028. Table 7- 53: Schedule for Implementation of the Project Activity Period Completion of Detail Design and tender process. End of 2023 Construction (5 years starting Beginning of 2024) 2024-2027 Completion of the construction End of 2027 Open for traffic Beginning of 2028 Design Period (20 years) 2028-2047 Traffic Growth Rate 7.4.7.2.1 Base year Traffic (at 2028) – AADT0 Base year traffic is the traffic that will use the project road at the first year of the opening of the road to traffic. It includes normal, diverted, generated and development induced traffics. It is obtained by forecasting the above-mentioned traffic to the base year by using the growth rate established above. The following gives the base year traffic at 2028. Table 7- 54: Base year Traffic (at 2028) - AADT1 – Station 1(Road segment 6&7) AADT0 2023 Growth 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total 269 52 3 3 0 6 3 3 0 339 9.72 9.72 9.31 9.31 9.31 9.99 9.99 9.99 10.11 8.81 8.81 8.68 8.68 8.68 8.99 8.99 8.99 9.1 670 131 8 7 1 14 8 7 0 rate (2015-2025) Growth Car rate (2026-2047) AADT0 at 2028 845 Table 7- 55: Base year Traffic (at 2028) - AADT1 – Station 2 (Road segment 2) AADT0 2023 Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total 869 149 1189 68 24 7 Engineering Works Consultant PLC. 44 14 8 5 140 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Growth Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 rate (2015-2025) Growth rate (2026-2047) AADT0 at 2028 9.72 9.72 9.31 9.31 9.31 9.99 9.99 9.99 10.11 8.81 8.81 8.68 8.68 8.68 8.99 8.99 8.99 9.1 2150 370 169 60 17 109 35 19 13 2939 Table 7- 56: Base year Traffic (at 2028) - AADT1 – Station 2 (Road segment 3) AADT0 2023 Growth Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total 869 149 68 24 7 22 7 4 3 1154 9.72 9.72 9.31 9.31 9.31 9.99 9.99 9.99 10.11 8.81 8.81 8.68 8.68 8.68 8.99 8.99 8.99 9.1 2150 370 169 60 17 54 18 9 6 rate (2015-2025) Growth rate (2026-2047) AADT0 at 2028 2852 Table 7- 57: Base year Traffic (at 2028) - AADT1 – Station 2 (Road segment 1-1) AADT0 2023 Growth 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total 997 198 84 30 7 32 13 9 3 1373 9.72 9.72 9.31 9.31 9.31 9.99 9.99 9.99 10.11 8.81 8.81 8.68 8.68 8.68 8.99 8.99 8.99 9.1 2465 491 207 74 18 78 32 21 7 rate (2015-2025) Growth Car rate (2026-2047) AADT0 at 2028 3393 Table 7- 58: Base year Traffic (at 2028) - AADT1 – Station 2 (Road segment 1-2) Car AADT0 2023 Growth (2015-2025) 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer 1304 224 103 36 10 33 11 6 4 9.72 9.31 9.31 9.31 9.99 9.99 9.99 10.11 rate 9.72 Engineering Works Consultant PLC. 141 Total 1730 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Growth rate (2026-2047) AADT0 at 2028 Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer 8.81 8.81 8.68 8.68 8.68 8.99 8.99 8.99 9.1 3224 554 253 89 25 81 26 14 9 Total 4278 Table 7- 59: Base year Traffic (at 2028) - AADT1 – Station 3 Road segment 5 AADT0 2023 Growth 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total 272 75 36 21 7 20 21 0 0 452 9.72 9.72 9.31 9.31 9.31 9.99 9.99 9.99 10.11 8.81 8.81 8.68 8.68 8.68 8.99 8.99 8.99 9.1 673 185 88 53 18 49 51 0 0 rate (2015-2025) Growth Car rate (2026-2047) AADT0 at 2028 1117 Table 7- 60: Base year Traffic (at 2028) - AADT1 – Station 4 (Road segment 4,8 & 9) AADT0 2023 Growth 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total 255 98 31 12 1 19 11 10 0 438 9.72 9.72 9.31 9.31 9.31 9.99 9.99 9.99 10.11 8.81 8.81 8.68 8.68 8.68 8.99 8.99 8.99 9.1 631 242 77 30 2 48 28 24 0 rate (2015-2025) Growth Car rate (2026-2047) AADT0 at 2028 7.4.7.2.2 Traffic forecast in the Design Period Traffic projection has been made for 20 consecutive years of the design period from the opening of the road to traffic by applying the growth rates estimated above. The following gives the forecasted traffic for each year of the design period of the project. The projection is made for normal, diverted and generated traffic only. For the development induced traffic, constant traffic volume given above is summed to the other traffic at each year of the design period since the induced volume of traffic is computed from the full capacity of the agricultural product and sugar factories. Engineering Works Consultant PLC. 142 1083 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 7- 61: Traffic forecast of road segment 6 and 7 at station 1 for the years 2028– 2047 Road segment 6 and 7 Private Vehicles Public Transport Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total Sum 2028 670 131 8 7 1 14 8 7 0 845 2029 729 142 9 7 1 16 9 7 0 920 2030 793 155 10 8 1 17 10 8 0 1001 2031 863 168 10 8 1 19 11 9 0 1089 2032 939 183 11 9 1 20 12 9 0 1185 2033 1,022 199 12 10 1 22 13 10 0 1290 2034 1,112 217 13 11 1 24 14 11 0 1403 2035 1,210 236 14 12 1 26 15 12 0 1527 2036 1,316 257 16 13 2 29 17 13 0 1662 2037 1,432 279 17 14 2 31 18 14 0 1808 2038 1,559 304 19 15 2 34 20 16 0 1968 2039 1,696 331 20 16 2 37 22 17 0 2141 2040 1,845 360 22 18 2 40 23 19 0 2330 2041 2,008 392 24 19 2 44 26 20 0 2535 2042 2,185 426 26 21 3 48 28 22 0 2759 2043 2,377 464 28 23 3 52 30 24 0 3002 2044 2,587 505 31 25 3 57 33 26 0 3266 2045 2,815 549 33 27 3 62 36 29 0 3554 2046 3,063 598 36 29 4 68 39 31 0 3867 2047 3,332 650 39 32 4 74 43 34 0 4208 Year Goods Vehicles Source; consultant Table 7- 62: Traffic forecast of road segment 2 at station 2 for the years 2028– 2047 Road segment 2 and 10 Private Vehicles Public Transport Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total Sum 2028 2150 370 169 60 17 109 35 19 13 2939 2029 2,339 402 183 65 18 118 38 21 14 3198 2030 2,545 438 199 70 20 129 42 22 15 3480 2031 2,769 476 216 77 22 141 46 25 16 3787 2032 3,013 518 235 83 24 153 50 27 18 4120 Year Goods Vehicles Engineering Works Consultant PLC. 143 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Road segment 2 and 10 Private Vehicles Public Transport Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total Sum 2033 3,279 564 256 90 26 167 54 29 19 4483 2034 3,568 613 278 98 28 182 59 32 21 4878 2035 3,882 667 302 107 30 198 64 35 23 5308 2036 4,224 726 328 116 33 216 70 38 25 5776 2037 4,596 790 356 126 36 236 76 41 28 6285 2038 5,001 860 387 137 39 257 83 45 30 6839 2039 5,441 935 421 149 42 280 91 49 33 7441 2040 5,921 1,018 458 162 46 305 99 53 36 8097 2041 6,442 1,108 497 176 50 332 108 58 39 8810 2042 7,010 1,205 540 191 54 362 118 63 43 9586 2043 7,628 1,311 587 208 59 395 128 69 46 10431 2044 8,300 1,427 638 226 64 430 140 75 51 11350 2045 9,031 1,552 694 245 69 469 152 82 55 12350 2046 9,826 1,689 754 267 75 511 166 89 60 13438 2047 10,692 1,838 819 290 82 557 181 97 66 14622 Year Goods Vehicles Source; consultant Table 7- 63: Traffic forecast of road segment 3 at station 2 for the years 2028– 2047 Road segment 3 Private Vehicles Public Transport Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total Sum 2028 2150 370 169 60 17 54 18 9 6 2852 2029 2,339 402 183 65 18 59 19 10 7 3103 2030 2,545 438 199 70 20 64 21 11 7 3376 2031 2,769 476 216 77 22 70 23 12 8 3673 2032 3,013 518 235 83 24 77 25 13 9 3997 2033 3,279 564 256 90 26 83 27 15 10 4349 2034 3,568 613 278 98 28 91 30 16 11 4731 2035 3,882 667 302 107 30 99 32 17 12 5148 2036 4,224 726 328 116 33 108 35 19 13 5601 2037 4,596 790 356 126 36 118 38 21 14 6095 2038 5,001 860 387 137 39 128 42 22 15 6631 2039 5,441 935 421 149 42 140 45 24 16 7215 Year Goods Vehicles Engineering Works Consultant PLC. 144 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Road segment 3 Private Vehicles Public Transport Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total Sum 2040 5,921 1,018 458 162 46 152 49 27 18 7850 2041 6,442 1,108 497 176 50 166 54 29 20 8541 2042 7,010 1,205 540 191 54 181 59 32 21 9294 2043 7,628 1,311 587 208 59 197 64 34 23 10112 2044 8,300 1,427 638 226 64 215 70 38 25 11002 2045 9,031 1,552 694 245 69 234 76 41 28 11971 2046 9,826 1,689 754 267 75 256 83 45 30 13025 2047 10,692 1,838 819 290 82 279 90 49 33 14172 Year Goods Vehicles Source; consultant Table 7- 64: Traffic forecast of road segment 1-1 at station 2 for the years 2028– 2047 Road segment 1-1 Private Vehicles Public Transport Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total Sum 2028 2465 491 207 74 18 78 32 21 7 3393 2029 2,682 534 225 81 19 85 35 23 7 3692 2030 2,919 581 245 88 21 93 38 25 8 4017 2031 3,176 632 266 96 23 101 41 28 8 4371 2032 3,456 688 289 104 25 111 45 30 9 4756 2033 3,760 748 314 113 27 120 49 33 10 5174 2034 4,091 814 341 123 29 131 53 36 11 5630 2035 4,452 886 371 133 32 143 58 39 12 6126 2036 4,844 964 403 145 35 156 63 42 13 6665 2037 5,271 1,049 438 157 38 170 69 46 14 7252 2038 5,735 1,141 476 171 41 185 75 50 16 7891 2039 6,241 1,242 517 186 45 202 82 55 17 8586 2040 6,790 1,351 562 202 48 220 89 60 19 9342 2041 7,389 1,470 611 220 53 240 97 65 20 10164 2042 8,039 1,600 664 239 57 261 106 71 22 11060 2043 8,748 1,741 722 259 62 285 116 78 24 12034 2044 9,518 1,894 784 282 68 310 126 85 26 13093 2045 10,357 2,061 852 306 74 338 137 92 29 14246 2046 11,269 2,242 926 333 80 369 150 100 31 15501 Year Goods Vehicles Engineering Works Consultant PLC. 145 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Road segment 1-1 Year Private Vehicles Public Transport Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total Sum 2,440 1,007 87 402 109 16866 2047 12,262 362 Goods Vehicles 163 34 Source; consultant Table 7- 65: Traffic forecast of road segment 1-2 at station 2 for the years 2028– 2047 Road segment 1-2 Private Vehicles Public Transport Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck Track Trailer Total Sum 2028 3224 554 253 89 25 81 26 14 9 4278 2029 3,508 603 275 97 27 89 29 15 10 4654 2030 3,818 656 299 106 30 97 31 17 11 5064 2031 4,154 714 324 115 32 105 34 18 12 5510 2032 4,520 777 353 125 35 115 37 20 13 5995 2033 4,918 845 383 136 38 125 41 22 15 6523 2034 5,351 920 417 147 42 136 44 24 16 7097 2035 5,823 1,001 453 160 45 149 48 26 17 7722 2036 6,336 1,089 492 174 49 162 53 28 19 8402 2037 6,894 1,185 535 189 53 177 57 31 21 9142 2038 7,501 1,290 581 206 58 193 62 34 23 9947 2039 8,162 1,403 632 223 63 210 68 37 25 10822 2040 8,881 1,527 686 243 69 229 74 40 27 11775 2041 9,664 1,661 746 264 75 249 81 43 29 12812 2042 10,515 1,808 811 287 81 272 88 47 32 13940 2043 11,441 1,967 881 312 88 296 96 52 35 15168 2044 12,449 2,140 958 339 96 323 105 56 38 16503 2045 13,546 2,329 1,041 368 104 352 114 61 41 17956 2046 14,739 2,534 1,131 400 113 383 124 67 45 19537 2047 16,038 2,757 1,229 435 123 418 136 73 49 21258 Year Goods Vehicles Source; consultant Table 7- 66: Traffic forecast of road segment 5 at station 3 for the years 2028– 2047 Road segment 5 Engineering Works Consultant PLC. 146 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Private Vehicles Public Transport Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck 2028 673 185 88 53 18 49 51 2029 732 202 95 57 20 54 2030 796 219 103 62 22 2031 867 239 112 68 2032 943 260 122 2033 1,026 283 2034 1,116 2035 Year Goods Vehicles Track Total Trailer Sum 0 0 1117 56 0 0 1215 58 61 0 0 1322 23 64 67 0 0 1439 73 25 69 73 0 0 1565 133 80 28 76 79 0 0 1703 307 144 87 30 82 86 0 0 1853 1,215 335 157 94 33 90 94 0 0 2017 2036 1,322 364 170 102 35 98 102 0 0 2194 2037 1,438 396 185 111 39 107 112 0 0 2387 2038 1,565 431 201 121 42 116 122 0 0 2598 2039 1,703 469 219 132 46 127 132 0 0 2827 2040 1,853 510 238 143 49 138 144 0 0 3076 2041 2,016 555 258 155 54 150 157 0 0 3346 2042 2,194 604 281 169 58 164 172 0 0 3641 2043 2,387 657 305 184 64 179 187 0 0 3962 2044 2,597 715 332 199 69 195 204 0 0 4311 2045 2,826 778 360 217 75 212 222 0 0 4691 2046 3,075 847 392 236 82 231 242 0 0 5104 2047 3,346 921 426 256 89 252 264 0 0 5553 Source; consultant Table 7- 67: Traffic forecast of road segment 4, 8 and 9 at station 4 for the years 2028– 2047 Road segment 4,8 and 9 forecast @ station-4 Private Vehicles Public Transport Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck 2028 631 242 77 30 2 48 28 2029 687 263 84 32 2 52 2030 748 286 91 35 2 2031 813 312 99 38 2032 885 339 107 41 Year Goods Vehicles Track Total Trailer Sum 24 0 1083 31 26 1 1178 57 34 28 1 1282 3 62 37 31 1 1395 3 68 40 33 1 1518 Engineering Works Consultant PLC. 147 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Road segment 4,8 and 9 forecast @ station-4 Private Vehicles Public Transport Car 4WD S/Bus M/Bus L/Bus S/Truck M/Truck H/Truck 2033 963 369 117 45 3 74 44 2034 1,048 402 127 49 3 81 2035 1,140 437 138 53 4 2036 1,241 475 150 58 2037 1,350 517 163 2038 1,469 563 2039 1,598 2040 Year Goods Vehicles Track Total Trailer Sum 36 1 1651 48 40 1 1797 88 52 43 1 1955 4 96 56 47 1 2128 63 4 104 62 51 1 2315 177 68 5 114 67 56 1 2519 612 192 74 5 124 73 61 1 2741 1,739 666 209 80 5 135 80 67 1 2983 2041 1,892 725 227 87 6 147 87 73 1 3246 2042 2,059 789 247 95 6 161 95 79 2 3532 2043 2,240 859 268 103 7 175 103 86 2 3843 2044 2,438 934 292 112 8 191 112 94 2 4182 2045 2,653 1,016 317 122 8 208 123 102 2 4551 2046 2,886 1,106 345 132 9 227 134 112 2 4952 2047 3,140 1,203 374 144 10 247 146 122 2 5389 Source; consultant Design Standard The design standard of a road is determined by the volume of traffic on the project road at the mid of the design period. The following table shows the design standard of the road sections with respect to mid-year traffic volume. Table 7- 68: Design Standard for sections of the Project Road Station Project road segments Mid-Year (2033) AADT Design Standard Remark 1 Road segment 6 and 7 1968 DC6 ERA 2013 Road segment 2and 10 6839 DC7 ERA 2013 Road segment 3 6631 DC7 ERA 2013 Road segment 1-1 7891 DC7 ERA 2013 Road segment 1-2 9947 DC7 ERA 2013 3 Road segment 5 2598 DC6 ERA 2014 4 Road segment 4,8 and 9 2519 DC 6 ERA 2013 2 Engineering Works Consultant PLC. 148 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 The design standard estimation for each station is as shown in the above, the road segments fall on to DC6 and DC7 as per the projected traffic at midyear. 7.4.8 Traffic Loading Axle load survey Axle load survey on the project road could not be conducted because of presence of few commercial vehicles at the time of survey, which will give inaccurate data. Instead, equivalency factor from the nearby and similar nature project has been collected and used for the project. Mean Equivalency Factor (EF) The Consultant has not carried out axle load survey specific for this project. It has rather adopted from other studies carried out for similar projects, and from nearby project. Literatures recommend that equivalency factor is better defined if the equivalency factor is collected from surveys conducted countrywide, preferably from similar projects. The following tables’ gives average EF used for similar projects Equivalency Factor / Truck Factor from similar Project Damage to a road pavement is not purely a function of the amount of traffic but rather the wheel or axle loading from the traffic. Light cars and vans have little effect on a pavement whilst heavily loaded trucks have a major impact. The vehicle damage factor is a multiplier for converting the number of commercial vehicles of different axle loads to the number of standard axle load repetitions. Design of the pavement structure is based upon the cumulative number of 8.16 tone equivalent standard axles (ESA) that will pass over the road during the design period. Equivalency factors as recommended by ERA Pavement Design Manual have been used to convert the axle load spectrum into an equivalent number of standard axles. It has been ascertained that the damaging effect of axles on flexible pavement is approximately proportional to the 4.5th power of the axle load as its computed using Liddle’s formula. The truck and equivalence factor are determined using the following relation, AL ( kg ) EF 8160 4 .5 Liddle Equation……...8.1 n TF EF i 1 Equation …………….8.2 Where, EF = Equivalence Factor, Engineering Works Consultant PLC. 149 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 AL = measured Axle Load, TF = Truck Factor, n = the number of axles of the vehicle. For this study, the consultant has used axle load measurements carried for the road project AACRA package 37 Lot-1 Road project near of the project area. Table 3-67 below summarizing truck factors adapted from the aforementioned road project report. Table 7- 69: Equivalency Factors, ESA/Vehicle Type Vehicle type Truck Factor S. Bus 0.10 M/Bus 0.30 L/Bus 1.70 ST 0.30 MT 1.30 HT 7.70 TT 14.10 Equivalency factor adopted from AACRA package 37 Lot-1 Road project report. Source: AACRA package 37 Lot-1 Road project report Using the volume of each class of traffic given above, and the Equivalency Factors given in Table 76 enables to determine a Cumulative Number of Equivalent Axles for each section of the project. Design Traffic in terms of cumulative number of ESA (CESA) Based on the cumulative traffic volume for each class of vehicles in one direction over the design period and the corresponding equivalency factors, the cumulative number of equivalent standard axles over the design period is determined using the formula given below. The design period for the analysis is 20 years from the year 2023. CESA EF*(0.5* AADT1 *365*((1 i)n 1) / i) The analysis for the determination of the cumulative number of ESAs is presented in the tables below. Engineering Works Consultant PLC. 150 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 7- 70: CESA for Road segment 6 and Road segment 7 at Station 1 Road segment 6 and Road segment 7 ESAL Estimation Private Vehicles Public Transport Cars Year and 4Two Three Mini Taxi WD Wheeler wheeler Bus Midi Bus 2028 0 0 0 0 146.95 357.79 2029 0 0 0 0 159.71 388.85 2030 0 0 0 0 173.57 422.60 2031 0 0 0 0 188.63 459.28 2032 0 0 0 0 205.01 499.15 2033 0 0 0 0 222.80 542.47 2034 0 0 0 0 242.14 589.56 2035 0 0 0 0 263.16 640.73 2036 0 0 0 0 286.00 696.35 2037 0 0 0 0 310.83 756.79 2038 0 0 0 0 337.81 822.48 2039 0 0 0 0 367.13 893.87 2040 0 0 0 0 399.00 971.46 2041 0 0 0 0 433.63 1055.78 2042 0 0 0 0 471.27 1147.42 2043 0 0 0 0 512.17 1247.02 2044 0 0 0 0 556.63 1355.26 2045 0 0 0 0 604.95 1472.90 2046 0 0 0 0 657.46 1600.75 2047 0 0 0 0 714.52 1739.69 Engineering Works Consultant PLC. ESA Std. Bus 250.65 272.40 296.05 321.75 349.67 380.03 413.01 448.86 487.82 530.17 576.18 626.20 680.55 739.62 803.82 873.59 949.42 1031.83 1121.39 1218.73 LGV 788.05 858.90 936.12 1020.27 1111.99 1211.96 1320.92 1439.67 1569.09 1710.16 1863.90 2031.46 2214.09 2413.14 2630.08 2866.52 3124.23 3405.09 3711.21 4044.85 Medium Truck 1980.24 2158.27 2352.29 2563.76 2794.25 3045.45 3319.24 3617.64 3942.86 4297.32 4683.65 5104.71 5563.63 6063.80 6608.93 7203.08 7850.63 8556.40 9325.63 10164.00 Heavy Truck 9340.17 10179.85 11095.01 12092.46 13179.57 14364.41 15655.77 17063.23 18597.21 20269.10 22091.29 24077.30 26241.85 28600.99 31172.22 33974.60 37028.92 40357.82 43985.99 47940.33 151 Truck trailer 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12863.85 14017.97 15275.64 16646.16 18139.64 19767.13 21540.64 23473.28 25579.34 27874.36 30375.32 33100.67 36070.57 39306.96 42833.75 46676.99 50865.09 55428.99 60402.42 65822.12 Cumulative number of ESA Traffic Class Cumulative number of ESA Traffic class 12863.85 26881.82 42157.46 58803.62 76943.26 96710.38 118251.02 141724.31 167303.64 195178.01 225553.32 258654.00 294724.57 334031.53 376865.28 423542.27 474407.36 529836.35 590238.77 656060.89 LV2 LV2 LV2 LV2 LV2 LV2 T1/LV3 T1/LV3 T1/LV3 T1/LV3 T1/LV3 T1/LV3 T1/LV3 T2/LV4 T2/LV4 T2/LV4 T2/LV4 T2/LV5 T2/LV5 T2/LV5 656,061 T2/V5 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 7- 71: CESA for Road segment 2 and 10 at Station 2 Road segment 2 and 10 ESAL Estimation Private Vehicles Cars Year and 4Two Three Taxi WD Wheeler wheeler 2028 0 0 0 0 2029 0 0 0 0 2030 0 0 0 0 2031 0 0 0 0 2032 0 0 0 0 2033 0 0 0 0 2034 0 0 0 0 2035 0 0 0 0 2036 0 0 0 0 2037 0 0 0 0 2038 0 0 0 0 2039 0 0 0 0 2040 0 0 0 0 2041 0 0 0 0 2042 0 0 0 0 2043 0 0 0 0 2044 0 0 0 0 2045 0 0 0 0 2046 0 0 0 0 2047 0 0 0 0 Public Transport Mini Bus 3075.53 3342.49 3632.62 3947.93 4290.61 4663.03 5067.78 5507.67 5985.73 6505.29 7069.95 7683.63 8350.56 9075.39 9863.14 10719.26 11649.69 12660.88 13759.85 14954.20 Midi Bus 3264.77 3548.15 3856.13 4190.84 4554.60 4949.94 5379.60 5846.55 6354.03 6905.56 7504.96 8156.39 8864.37 9633.79 10470.01 11378.80 12366.48 13439.89 14606.48 15874.32 Engineering Works Consultant PLC. Std. Bus 5228.56 5682.40 6175.63 6711.67 7294.25 7927.39 8615.48 9363.31 10176.04 11059.32 12019.27 13062.55 14196.38 15428.62 16767.82 18223.27 19805.05 21524.13 23392.43 25422.89 LGV 5941.74 6475.91 7058.09 7692.61 8384.18 9137.92 9959.41 10854.77 11830.61 12894.18 14053.37 15316.77 16693.74 18194.51 19830.20 21612.93 23555.93 25673.61 27981.67 30497.22 Medium Truck 8354.03 9105.06 9923.61 10815.74 11788.07 12847.82 14002.84 15261.69 16633.72 18129.09 19758.90 21535.22 23471.24 25581.30 27881.06 30387.57 33119.41 36096.85 39341.96 42878.80 Heavy Truck 26606.06 28997.94 31604.86 34446.14 37542.84 40917.95 44596.47 48605.69 52975.34 57737.83 62928.46 68585.72 74751.58 81471.75 88796.06 96778.82 105479.24 114961.82 125296.89 136561.08 152 Truck trailer 32372.56 35318.46 38532.44 42038.89 45864.43 50038.10 54591.56 59559.40 64979.30 70892.42 77343.63 84381.90 92060.65 100438.17 109578.04 119549.64 130428.66 142297.67 155246.76 169374.21 ESA 84843.25 92470.41 100783.37 109843.82 119718.99 130482.14 142213.15 154999.07 168934.78 184123.69 200678.54 218722.17 238388.52 259823.54 283186.33 308650.31 336404.48 366654.86 399626.03 435562.73 Cumulative number of ESA Traffic Class Cumulative number of ESA Traffic class 84843.25 177313.66 278097.03 387940.85 507659.83 638141.98 780355.13 935354.20 1104288.98 1288412.67 1489091.21 1707813.39 1946201.91 2206025.45 2489211.78 2797862.08 3134266.56 3500921.42 3900547.45 4336110.18 LV2 T1/LV3 T1/LV3 T2/LV4 T2/LV5 T2/LV5 T3 T3 T3 T3 T3 T4 T4 T4 T4 T4 T5 T5 T5 T5 4,336,110 T5 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 7- 72: CESA for Road segment 3 at Station 2 Road segment 3 ESAL Estimation Year 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 Private Vehicles Car s 4Two and W Wheel er Taxi D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Public Transport Three wheele r 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Mini Bus 3075.53 3342.49 3632.62 3947.93 4290.61 4663.03 5067.78 5507.67 5985.73 6505.29 7069.95 7683.63 8350.56 9075.39 9863.14 10719.26 11649.69 12660.88 13759.85 14954.20 Midi Bus 3264.77 3548.15 3856.13 4190.84 4554.60 4949.94 5379.60 5846.55 6354.03 6905.56 7504.96 8156.39 8864.37 9633.79 10470.01 11378.80 12366.48 13439.89 14606.48 15874.32 Engineering Works Consultant PLC. Std. Bus 5228.56 5682.40 6175.63 6711.67 7294.25 7927.39 8615.48 9363.31 10176.04 11059.32 12019.27 13062.55 14196.38 15428.62 16767.82 18223.27 19805.05 21524.13 23392.43 25422.89 LGV 2970.87 3237.95 3529.04 3846.31 4192.09 4568.96 4979.71 5427.38 5915.30 6447.09 7026.68 7658.38 8346.87 9097.26 9915.10 10806.47 11777.97 12836.81 13990.84 15248.61 Medium Truck 4177.02 4552.53 4961.80 5407.87 5894.04 6423.91 7001.42 7630.85 8316.86 9064.55 9879.45 10767.61 11735.62 12790.65 13940.53 15193.79 16559.71 18048.42 19670.98 21439.40 Heavy Truck 13303.03 14498.97 15802.43 17223.07 18771.42 20458.97 22298.23 24302.85 26487.67 28868.91 31464.23 34292.86 37375.79 40735.87 44398.03 48389.41 52739.62 57480.91 62648.45 68280.54 153 Truck trailer 16186.28 17659.23 19266.22 21019.45 22932.22 25019.05 27295.78 29779.70 32489.65 35446.21 38671.81 42190.95 46030.32 50219.08 54789.02 59774.82 65214.33 71148.83 77623.38 84687.11 ESA Cumulative number of ESA Traffic Class Cumulative number of ESA Traffi c class 48206.05 52521.72 57223.87 62347.13 67929.22 74011.25 80638.01 87858.30 95725.29 104296.9 113636.3 123812.3 134899.9 146980. 160143.6 174485.8 190112.8 207139.8 225692.3 245907.0 48206.05 100727.77 157951.65 220298.78 288228.00 362239.25 442877.26 530735.56 626460.85 730757.79 844394.15 968206.52 1103106.43 1250087.11 1410230.76 1584716.58 1774829.43 1981969.32 2207661.70 2453568.77 LV2 T1/LV3 T1/LV3 T2/LV3 T2/LV3 T2/LV4 T2/LV4 T2/LV5 T2/LV5 T3 T3 T3 T3 T3 T3 T4 T4 T4 T4 T4 2,453,569 T4 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 7- 73: CESA for Road segment 1-1 at Station 2 Road segment 1-1 ESAL Estimation Private Vehicles Cars Year and 4Two Three Taxi WD Wheeler wheeler 2028 0 0 0 0 2029 0 0 0 0 2030 0 0 0 0 2031 0 0 0 0 2032 0 0 0 0 2033 0 0 0 0 2034 0 0 0 0 2035 0 0 0 0 2036 0 0 0 0 2037 0 0 0 0 2038 0 0 0 0 2039 0 0 0 0 2040 0 0 0 0 2041 0 0 0 0 2042 0 0 0 0 2043 0 0 0 0 2044 0 0 0 0 2045 0 0 0 0 2046 0 0 0 0 2047 0 0 0 0 Public Transport Mini Bus 3778.26 4106.21 4462.63 4849.99 5270.96 5728.48 6225.72 6766.11 7353.41 7991.68 8685.36 9439.25 10258.58 11149.02 12116.76 13168.49 14311.52 15553.76 16903.82 18371.07 Midi Bus 4073.68 4427.27 4811.56 5229.20 5683.09 6176.39 6712.50 7295.14 7928.36 8616.54 9364.46 10177.29 11060.68 12020.75 13064.15 14198.12 15430.52 16769.89 18225.51 19807.49 Engineering Works Consultant PLC. Std. Bus 5540.13 6021.02 6543.64 7111.63 7728.92 8399.79 9128.89 9921.28 10782.44 11718.36 12735.51 13840.95 15042.35 16348.03 17767.03 19309.21 20985.25 22806.77 24786.40 26937.86 LGV 4287.96 4673.45 5093.59 5551.51 6050.59 6594.53 7187.38 7833.53 8537.76 9305.31 10141.85 11053.61 12047.32 13130.38 14310.80 15597.34 16999.54 18527.80 20193.45 22008.84 Medium Truck 7542.03 8220.06 8959.05 9764.47 10642.29 11599.03 12641.79 13778.28 15016.95 16366.97 17838.37 19442.03 21189.87 23094.84 25171.07 27433.95 29900.26 32588.29 35517.98 38711.05 Heavy Truck 29968.33 32662.48 35598.84 38799.17 42287.22 46088.84 50232.23 54748.10 59669.96 65034.29 70880.87 77253.06 84198.11 91767.52 100017.42 109008.99 118808.89 129489.81 141130.95 153818.62 154 Truck trailer 16783.85 18311.19 19977.50 21795.46 23778.84 25942.72 28303.50 30879.12 33689.12 36754.83 40099.52 43748.58 47729.70 52073.10 56811.76 61981.63 67621.95 73775.55 80489.13 87813.64 ESA 71974.24 78421.67 85446.80 93101.41 101441.91 110529.78 120432.00 131221.56 142978.00 155787.98 169745.94 184954.78 201526.62 219583.64 239258.99 260697.72 284057.93 309511.87 337247.24 367468.56 Cumulative number of ESA Traffic Class Cumulative number of ESA Traffic class 71974.24 150395.92 235842.72 328944.13 430386.05 540915.83 661347.83 792569.39 935547.39 1091335.38 1261081.32 1446036.10 1647562.71 1867146.35 2106405.34 2367103.06 2651161.00 2960672.87 3297920.10 3665388.67 LV2 T1/LV3 T1/LV3 T2/LV4 T2/LV4 T2/LV5 T2/LV5 T3 T3 T3 T3 T3 T4 T4 T4 T4 T4 T4 T5 T5 3,665,389 T5 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 7- 74: CESA for Road segment 1-2 at Station 2 Road segment 1-2 ESAL Estimation Year Private Vehicles Cars and 4Two Three Taxi WD Wheeler wheeler 2028 0 0 0 0 2029 0 0 0 0 2030 0 0 0 0 2031 0 0 0 0 2032 0 0 0 0 2033 0 0 0 0 2034 0 0 0 0 2035 0 0 0 0 2036 0 0 0 0 2037 0 0 0 0 2038 0 0 0 0 2039 0 0 0 0 2040 0 0 0 0 2041 0 0 0 0 2042 0 0 0 0 2043 0 0 0 0 2044 0 0 0 0 2045 0 0 0 0 2046 0 0 0 0 2047 0 0 0 0 Public Transport Mini Bus 4613.30 4613.30 5013.73 5448.92 5921.89 6435.91 6994.55 7601.68 8261.50 8978.60 9757.94 10604.93 11525.44 12525.85 13613.09 14794.71 16078.89 17474.54 18991.32 20639.77 Midi Bus 1632.38 4897.15 5322.22 5784.19 6286.26 6831.91 7424.92 8069.40 8769.82 9531.04 10358.34 11257.44 12234.59 13296.55 14450.69 15705.01 17068.21 18549.73 20159.84 21909.72 Engineering Works Consultant PLC. Std. Bus 461.34 7842.84 8523.59 9263.44 10067.51 10941.37 11891.08 12923.23 14044.96 15264.07 16588.99 18028.91 19593.82 21294.56 23142.93 25151.74 27334.91 29707.58 32286.20 35088.64 LGV 1485.44 4456.31 4856.93 5293.57 5769.46 6288.13 6853.44 7469.56 8141.07 8872.96 9670.64 10540.03 11487.57 12520.31 13645.88 14872.65 16209.70 17666.95 19255.21 20986.25 Medium Truck 481.96 6265.52 6828.80 7442.70 8111.80 8841.05 9635.87 10502.13 11446.27 12475.29 13596.82 14819.17 16151.42 17603.43 19185.98 20910.80 22790.68 24839.56 27072.64 29506.47 Heavy Truck 259.15 19954.54 21748.46 23703.64 25834.60 28157.13 30688.46 33447.35 36454.27 39731.51 43303.37 47196.34 51439.29 56063.69 61103.81 66597.04 72584.12 79109.43 86221.37 93972.67 155 Truck trailer 172.19 24279.42 26488.85 28899.33 31529.17 34398.32 37528.57 40943.67 44669.55 48734.48 53169.31 58007.72 63286.42 69045.49 75328.63 82183.53 89662.23 97821.50 106723.25 116435.07 ESA 9105.77 72309.08 78782.58 85835.81 93520.70 101893.83 111016.88 120957.02 131787.45 143587.94 156445.40 170454.55 185718.55 202349.87 220471.01 240215.48 261728.73 285169.28 310709.83 338538.58 Cumulative number of ESA Traffic Class Cumulative number of ESA Traffic class 9105.77 81414.85 160197.43 246033.24 339553.93 441447.77 552464.65 673421.66 805209.11 948797.05 1105242.45 1275697.00 1461415.55 1663765.42 1884236.43 2124451.91 2386180.64 2671349.91 2982059.74 3320598.33 LV2 LV2 T1/LV3 T2/LV3 T2/LV4 T2/LV4 T2/LV5 T2/LV5 T3 T3 T3 T3 T3 T4 T4 T4 T4 T4 T4 T5 3,320,598 T5 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 7- 75: CESA for Road segment 5 at Station 3 Road segment 5 ESAL Estimation Private Vehicles Cars Year and 4Taxi WD Two Wheeler 2028 0 0 0 2029 0 0 0 2030 0 0 0 2031 0 0 0 2032 0 0 0 2033 0 0 0 2034 0 0 0 2035 0 0 0 2036 0 0 0 2037 0 0 0 2038 0 0 0 2039 0 0 0 2040 0 0 0 2041 0 0 0 2042 0 0 0 2043 0 0 0 2044 0 0 0 2045 0 0 0 2046 0 0 0 2047 0 0 0 Public Transport Three wheeler 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Mini Bus 1597.46 1736.12 1886.81 2050.59 2228.58 2422.02 2632.25 2860.73 3109.04 3378.91 3672.19 3990.94 4337.35 4713.84 5123.00 5567.67 6050.95 6576.17 7146.98 7767.34 Midi Bus 2883.05 3133.30 3405.27 3700.84 4022.08 4371.19 4750.61 5162.97 5611.11 6098.16 6627.48 7202.74 7827.94 8507.40 9245.85 10048.39 10920.59 11868.49 12898.68 14018.28 Engineering Works Consultant PLC. Std. Bus 5652.93 6143.61 6676.87 7256.43 7886.28 8570.81 9314.76 10123.28 11001.98 11956.95 12994.82 14122.77 15348.62 16680.88 18128.78 19702.36 21412.53 23271.13 25291.07 27486.33 LGV 2690.57 2932.45 3196.08 3483.41 3796.57 4137.88 4509.87 4915.31 5357.20 5838.81 6363.72 6935.82 7559.35 8238.93 8979.61 9786.88 10666.72 11625.66 12670.81 13809.91 Medium Truck 12192.91 13289.05 14483.74 15785.82 17204.97 18751.70 20437.47 22274.80 24277.31 26459.84 28838.58 31431.16 34256.83 37336.51 40693.07 44351.37 48338.56 52684.20 57420.51 62582.61 156 Heavy Truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Truck trailer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ESA 25016.92 27234.53 29648.77 32277.09 35138.48 38253.60 41644.97 45337.09 49356.64 53732.66 58496.78 63683.43 69330.09 75477.57 82170.31 89456.68 97389.35 106025.66 115428.04 125664.48 Cumulative number of ESA Traffic Class Cumulative number of ESA Traffic class 25016.92 52251.44 81900.21 114177.30 149315.78 187569.38 229214.35 274551.44 323908.07 377640.74 436137.52 499820.95 569151.04 644628.61 726798.92 816255.60 913644.94 1019670.60 1135098.65 1260763.13 LV2 LV2 LV2 T1/LV3 T1/LV3 T1/LV3 T1/LV3 T1/LV3 T1/LV4 T1/LV4 T1/LV4 T1/LV4 T2/LV5 T2/LV5 T3 T3 T3 T3 T3 T3 1,260,763 T3 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 7- 76: CESA for Road segment 4,8 and 9 at Station 4 Road segment 4,8 and 9 ESAL Estimation Private Vehicles Public Transport Cars Year and 4Two Three Mini Midi Taxi WD Wheeler wheeler Bus Bus 2028 0 0 0 0 1405.45 1617.82 2029 0 0 0 0 1527.44 1758.24 2030 0 0 0 0 1660.03 1910.86 2031 0 0 0 0 1804.12 2076.72 2032 0 0 0 0 1960.71 2256.98 2033 0 0 0 0 2130.90 2452.89 2034 0 0 0 0 2315.87 2665.80 2035 0 0 0 0 2516.88 2897.19 2036 0 0 0 0 2735.35 3148.66 2037 0 0 0 0 2972.78 3421.97 2038 0 0 0 0 3230.81 3719.00 2039 0 0 0 0 3511.25 4041.80 2040 0 0 0 0 3816.02 4392.63 2041 0 0 0 0 4147.25 4773.91 2042 0 0 0 0 4507.24 5188.29 2043 0 0 0 0 4898.46 5638.63 2044 0 0 0 0 5323.65 6128.07 2045 0 0 0 0 5785.74 6659.98 2046 0 0 0 0 6287.95 7238.07 2047 0 0 0 0 6833.74 7866.33 Engineering Works Consultant PLC. Std. Bus 623.15 677.24 736.02 799.91 869.34 944.80 1026.81 1115.93 1212.80 1318.07 1432.48 1556.82 1691.95 1838.81 1998.42 2171.88 2360.40 2565.28 2787.95 3029.94 LGV 2634.18 2870.99 3129.09 3410.40 3716.99 4051.15 4415.35 4812.29 5244.91 5716.43 6230.34 6790.45 7400.91 8066.25 8791.40 9581.75 10443.15 11381.99 12405.23 13520.46 Medium Truck 6730.04 7335.07 7994.49 8713.19 9496.51 10350.25 11280.73 12294.87 13400.18 14604.86 15917.83 17348.85 18908.51 20608.38 22461.08 24480.33 26681.11 29079.74 31694.01 34543.30 Heavy Truck 33330.60 36327.02 39592.82 43152.21 47031.59 51259.73 55867.98 60890.52 66364.57 72330.75 78833.28 85920.39 93644.64 102063.29 111238.78 121239.15 132138.55 144017.80 156965.00 171076.15 157 Truck trailer 1195.15 1303.91 1422.56 1552.02 1693.25 1847.34 2015.44 2198.85 2398.95 2617.25 2855.42 3115.26 3398.75 3708.04 4045.47 4413.61 4815.24 5253.43 5731.49 6253.06 ESA 47536.38 51799.91 56445.87 61508.56 67025.38 73037.06 79587.98 86726.53 94505.42 102982.10 112219.16 122284.82 133253.41 145205.93 158230.67 172423.81 187890.16 204743.97 223109.70 243122.99 Cumulative number of ESA Traffic Class Cumulative number of ESA Traffic class 47536.38 99336.28 155782.15 217290.71 284316.09 357353.15 436941.13 523667.66 618173.08 721155.18 833374.34 955659.15 1088912.56 1234118.49 1392349.16 1564772.97 1752663.13 1957407.10 2180516.80 2423639.79 LV2 LV2 T2/LV3 T1/LV3 T2/LV3 T2/LV4 T2/LV4 T2/LV5 T2/LV5 T3 T3 T3 T3 T3 T3 T4 T4 T4 T4 T4 2,423,640 T4 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Design Traffic Classes The following table gives the traffic class as obtained from the axle load survey analysis presented above. Table 7- 77: Design Traffic Classes Station. Project Road Segments No 1 Cumulative number of ESAs (106) Traffic class Remark Road segment 6 and 7 0.656 T2/LV5 As per ERA PDM, 2013 Road segment 2 and 10 4.33 T5 As per ERA PDM, 2013 Road segment 3 2.45 T4 As per ERA PDM, 2013 Road segment 1-1 3.66 T5 As per ERA PDM, 2013 Road segment 1-2 3.32 T5 As per ERA PDM, 2013 3 Road segment 5 1.26 T3 As per ERA PDM, 2013 4 Road segment 4,8 and 9 2.423 T4 As per ERA PDM, 2013 2 7.5 Subgrade Soil Investigation. 7.5.1 General The subgrade soil investigation was aimed to assess the actual condition of the alignment soil which includes soil extension survey, sampling, logging and testing. The purposes of the sub grade soil investigation along the road corridor are: To assess the nature of the material along the road alignment, To characterize physical and mechanical properties of material along the route alignment. To identify problematic soils and to suggest possible remedial measures that would suit the pavement design. The detailed sub grade field investigation along the road corridor is presented in the following sub section. 7.5.2 Soil Extension Survey The soil extension survey along the road corridor is carried out by visual observation of the color, texture, moisture and appearance of the soil along the road side and from test pits log. Accordingly, the dominant road bed material of Chiro Town Road Segments Are Dark brown silty CLAY soil which is commonly Poor roadbed material. The Graphical representation of soil extension survey presented here in figure below but detail soil extension survey along the road alignment is presented in Annex of this report. Engineering Works Consultant PLC. 158 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 7- 78: Summary of the roadbed materials Length Subgrade Subgrade soil type (km) Extension composition dark brown to brown , silty CLAY soil 10.665 48% Grey Slightly to Moderately weathered Rock underlying Fresh basaltic rock poor/Unsuitable Good subgrade 5.30 24% Grey highly weathered to decomposed rock soil Remark Fair to poor , silty CLAY soil with gravel 4.013 18% light grey to Dark Brown SILTY CLAY soil 2.224 10% Fair to poor Figure 7- 1: Summary of Soil Extension 7.5.3 Sampling and Logging To determine the engineering properties and to assess the suitability of the soils along the road alignment, representative disturbed samples were collected by digging test pits along the road alignment. Test pits of approx. 1.0 m x 1.0 m size at staggered position are excavated up to 1.2m depth below the original surface of the road at regular intervals of 0.5km, and the lithological soil Engineering Works Consultant PLC. 159 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 formations were properly logged. After collecting the samples, the sample tags are labeled and inserted into sample bags with the following information: The project name; GPS/Station of sampling; Depth of sampling; Type of material sampled and; The type of test required After completing the logging and sampling, the test pits were backfilled, compacted and leveled off to their original level. The test pit logs are summarized and presented in Annex–II of this soil and material report. 7.5.4 Subgrade Soil Analysis. The subgrade soil was investigated by visual observation, pit excavation and sampling of representative soil layers from the test pits. As mentioned above, samples of sub-grade materials were collected from the road alignment at every 0.5km interval to assess the properties of the road bed materials. Classification tests (sieve analysis, atterberg limits, and natural moisture content) were conducted on samples collected at interval of 0.5Km, while modified proctor, three point CBR and swell tests were conducted at interval of 0.5Km in staggered manner. The test results are summarized and presented in Appendix. For easy analysis and understanding nearby routes are categorized as follow; 1. Muze tera to TTC road segment 2. Kebet tera to Chiro wereda office and Sumeya bridge to Addis ketema Road segments 3. Agape Hotel to Agri research Center to TTC Road segment and Agri research Center to ODA Bultu university to Main Asphalt Road 4. Chiro Town Administration to mticho to Leila Road Segment 5. Hundi gudina Scl to Nejebac Kidan mihiret Road Segment and Hundi gudina Scl to Aschalew Hotel Road Segments 6. Blood Bank to Genda to Quteba Bono Road Segments 7. Chiro wereda office to Care Ethiopia Road Segment Almost all group of roads traverses dark brown silty CLAY soil (expansive soil), which is characterize as poor/unsuitable sub grade material except chiro town administration to mudhicho No.9 School, which dominates fair to good subgrade materials, detail material test result presented in Annex IV. Engineering Works Consultant PLC. 160 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Plasticity Analysis An indication as to the nature of the soil along the route may be given by the variation in Liquid Limit(LL) and Plasticity Index (PI). LL&PI is influenced by the type and proportion of clay minerals present within the material and high LL&PI values are often an indication of expansiveness of the soil. The variation of PI and LL along the project road Segments are presented in figure 4.1 below. It can be seen from the figure that the values of PI range from NP to 41%, and Liquid limit value range from NP to 75%. Liquid limit < or =60% is 69% and PI < or =30% is 78% is calculated from laboratory test result for all Road segments excavated pit. Figure 7- 2: Variation of Plastic Index (PI) for the Road project The plasticity of a soil can also be expressed in terms of the plasticity chart shown below. The plasticity chart helps to classify the type of soils based on their plasticity characteristics (i.e. Atterberg Limits and Index of soils). Generally, materials falling above the A-Line are classified as clays and below the A-Line are as silts. As can be noted from the graphs below road alignment, majority of soils along the road alignment fall under the group CL and ML&OL can be described as Low plastic silty soil and low plastic clay. The plasticity chart of sub grade soil for the all sections are presented in the Figure below Engineering Works Consultant PLC. 161 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 CH MH&OH CL ML & CL ML & OL Figure 7- 3: Plasticity Chart for all project Road Segments Sub-grade soil Sub grade Soil Classification AASHTO soil classification reveals that the sub grade materials along all Road Segments section of the alignments mainly classified as A-1-b, A-2-7, A-4, A-6, A-7-5 and A-7-6 soil groups. Out of the Six Groups A-7-6 comprise 35.3% of the sub grade material (the largest proportion) which is followed by A-7-5, 33.3% then A-2-7,25.5% and A-1-b, A-4 and A-6 materials which constituent 2 %, 2% and 2% of the sub grade soil, respectively. Composition of the sub grade soil materials for the road alignment is summarized in the figure 4.3 below. Figure 7- 4: Percentage compositions of sub-grade soil for all Road Segments of the Project. Engineering Works Consultant PLC. 162 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Sub Grade Strength Analysis 7.5.4.3.1 Maximum Dry Density (MDD) AND Optimum Moisture Content (OMC) Soil samples obtained from test pits have been compacted in the laboratory at various moisture contents to derive a dry density versus moisture content relationship. Compaction tests were carried out at 0.5km intervals, in accordance with AASHTO T180 (4.5 kg hammer or heavy hammer). The MDD value along the alignment ranges between 1.340 g/cm3 and 2.25g/cm3 The Maximum Dry Density (MDD) obtained from these tests is summarized in Figure 4.3 for all road segments of the project. Figure 7- 5: Variation of MDD along All road segments. The optimum Moisture Content (OMC) along the road alignment varies from 11% to 29%. The values of Optimum Moisture Content (OMC) obtained from the compaction tests are presented in Figure 4.4 below. Engineering Works Consultant PLC. 163 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Figure 7- 6: Variation of OMC along All road segments 7.5.4.3.2 California Bearing Ratio (CBR) and Swell Values Soaked CBR tests were carried out on disturbed soil samples recovered from trial pits along the road segments alignment to determine the shear strength of the sub-grade material. Three-point CBRs were undertaken in accordance to AASHTO T-193 to determine the variation of sub grade strength with increasing compaction effort. The CBR value at 93% of MDD is plotted in Figure 4.6 below. Figure 7- 7: CBR Value for all Road segments of the Project As can be seen from the above figures, the CBR values @ 93% of MDD along all road segments alignment vary between 0.8% and 50.5%. 33% of the CBR value is greater than or equal to 5% and the remaining 67% of the CBR values is less than 5%. This implies that most sections of the road segments alignment of the project has a subgrade class of S1, as per ERA sub grade classification. The swell value of the samples is also determined along with the CBR test to evaluate the potential heaving of the sub grade soils. Accordingly, the CBR swell value vary between 0.2% and 12.2%. 37% of the sub grade soil CBR swell value is less than 3% and the rest of 63% of the CBR swell of the sub grade soil is greater than 3%. Hence, according to the CBR test result as well as the CBR swell value most of the Road segments alignment of the project are very weak and are having high heaving potential. The variation of CBRSwell value for all road segments of the project are presented in the figures below Engineering Works Consultant PLC. 164 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Figure 7- 8: Variation of CBR-swell value for all Road segments of the Project 7.5.5 Subgrade Soil Data Interpretation Analysis and interpretation of sub grade soil As mentioned above; 47 samples of sub-grade materials were collected from the road segments alignment at every 0.5km interval to assess the properties and strength of the road bed materials. Classification tests (sieve analysis and atterberg limits and modified proctor, three point CBR and swell tests were conducted on samples collected at every 0.5km. The test results are summarized and presented in Annex III The classification test result reveals that the sub-grade materials along the road segments are classified into Six different groups A-1-b, A-2-7, A-4, A-6, A-7-5 and A-7-6 Out of the six groups A-76 comprise 35.3% of the subgrade material (the largest proportion) which is followed by A-7-5 &A-27 materials which constituent 33.3%,25.5 respectively. The remaining groups of soil classification comprise total 6% of the subgrade. The sub grade material rating according to AASHTO and Project test result rating comprise the samples for critical parameters with the stretch they represent summarized with the following tables. Table 7- 79: Analysis and interpretation of sub grade soil Material Percent LL rating <=60 PI Swell Group <=30 CBR > <= 3 index Rating classificat compositi AASHTO ion on(%) (M145) (%) (%) =5 (%) (%) range Test result A-7-6 34 Fair to Poor 94 88 13 25 1-35 poor to fair A-7-5 31.9 Fair to Poor 33 47 7 7 8-43 Poor subgrade` Engineering Works Consultant PLC. 165 from Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Material Percent LL Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 PI Swell <=30 CBR > <= 3 index Rating (%) (%) =5 (%) (%) range Test result 77 92 85 85 0-3 rating <=60 Group classificat compositi AASHTO ion on(%) (M145) A-2-7 27.7 A-6 2.1 Fair to Poor 100 100 100 100 6 poor to fair A-4 2.1 Fair to Poor 100 100 0 0 2 Poor subgrade A-1-b 2.1 Excellent to Good 100 100 100 100 0 poor to fair Excellent to Good from Fair to Good/excellent Table 7- 80: Comparison of project rating with AASHTO rating Material Project rating AASHTO Rating Comparison classific with ation AASHTO Reason for the difference (if there is any) Rating A-7-6 Fair to Poor Fair to Poor A-7-5 Poor subgrade Fair A-2-7 A-6 poor to fair A-4 poor to fair According to ERA subgrade test to The same - Good AASHTO According to ERA design manual table 3.3 Rate typical design CBR values , their LL & PI project Rate According Fair to Poor Excellent A-1-b project Rate Requirement of LL,PI,CBR-SWELL &CBR Fair to Poor Poor subgrade - Fair to Poor to Excellent Good/excellent The same to ERA subgrade test Requirement of LL,PI,CBR-SWELL &CBR to project Rate According to AASHTO LL specification Good The liquid limit values and plasticity index value shows that the majority of the samples are low plasticity. But CBR & CBR-Swell Value shows that majority of the soil samples are weak and high expansive subgrade respectively, which confirms that majority of the subgrade soils have low plasticity and Weak expansive behavior. 7.5.6 Unsuitable soil sections The natural sub-grade soils along the existing road stretches of the proposed roads is characterized by Dark brown CLAY SILTY soil, which are relatively high in swell value and weak in bearing capacity. These stretches have been identified by using the criteria set in the ERA Standard Engineering Works Consultant PLC. 166 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Specification, 2013, section 4103. Accordingly, sections where LL is less than 60%, Pl less than 30% and swell > 3.0% and the sub grade strengths is weak (CBR<3%) are identified as given in table below. Table 7- 81: Unsuitable soil stretches for all Road segments of the Project Limits for Sr. New Station Interval No From To LL PI Swell CBR Degree of Expansion Km degree of expansion Remark ** LL PI Chiro Town Administration to Mtichu to Lelia 1 0+000 0+700 0.7 55 23 5 2 Medium >60 2 1+500 2+100 0.6 55 29 9.4 1.4 Medium >60 3 2+100 3+000 0.9 63 34 0.9 14.9 high to Very high >60 25- Due to PI, 41 swell 25- Due to Swell 41 &CBR 25- Due to LL, 41 PI Muze tera to TTC to Qilisa road segment 0+450 0+700 0.25 62 31 10.3 1 high >60 2 0+700 1+300 0.6 48 24 5 4 high >60 3 1+300 1+700 0.4 51 24 4 3 Medium >60 4 2+400 3+200 0.8 54 23 5.6 2.1 Medium >60 5 3+200 3+700 0.5 57 28 6.3 2.2 high >60 6 4+100 6+047 1.947 58- 25- 2.2- 63 32 4.9 2.8-8 high >60 28 Due to LL, PI ,Swell &CBR 25- Due to Swell 41 &CBR 25- Due to LL, 41 swell& CBR 25- Due to LL, 41 swell& CBR 25- Due to LL, 41 swell& CBR 25- Due to LL, 41 swell& CBR Hundi gudina School to Nejubac Kidest kidan mihiret Church road segment 1 0+000 2+536 2.536 54- 23- 7.1- 1.08- 72 38 10.8 2.2 Engineering Works Consultant PLC. Very high >60 2541 Due to LL, PI, CBR 167 swell& Expansive(Unsuitable section) 1 15- Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Limits for Sr. New Station Interval No From To LL PI Swell CBR Degree of Expansion Km degree of expansion Remark ** LL PI Agricultural research center to Oda Bultu Universtity to Main Asphalt road road segment 1 2 3 0+000 0+400 0.4 0+400 1+000 0.6 1+000 1+236 0.236 62- 29- 6- 1.4- high 75 41 11.4 2.42 Very high 62- 29- 6- 1.4- 75 41 11.4 2.42 62 28 9 1 to Very high Very high >60 >60 >60 2541 2541 2541 Due to LL, PI, swell& CBR Due to LL, PI, swell& CBR Due to LL, PI, swell& CBR Hundi gudina School to Aschalew Hotel road segment 1 0+000 0+855 0.855 54- 28- 3.4- 1.4- 64 31 10.8 3.22 Very high >60 2541 Due to LL, PI, swell& CBR Blood bank to Genda to Quteba Bono road segment 1 2 3 4 5 0+000 1+022 1.022 0+000 0+153 0.153 52 56 0+000 0+141 0+141 45 0+000 0+214 0.214 0+000 0+096 0.096 52 56 24 25 21 24 25 7 6 2 7 6 Engineering Works Consultant PLC. 1 3 4 1 3 medium medium medium medium medium >60 >60 >60 >60 >60 2541 2541 2541 2541 2541 Due to LL, PI, swell& CBR Due to LL, PI, swell& CBR Due to LL, PI, swell& CBR Due to LL, PI, swell& CBR Due to LL, PI, swell& CBR 168 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Limits for Sr. New Station Interval No From To LL PI Swell CBR Degree of Expansion Km degree of expansion Remark ** LL PI Sumeya bridge to Addis ketema Road segment 1 0+000 0+524 0.524 67 36- 8.8- 1.1- 37 9.4 1.4 Very high >60 2541 Due to LL, PI, swell& CBR Agape Hotel to Agricultural research center to TTC Road segment 1 0+000 0+584 0.584 54- 28- 60 30 11 1.11.4 Very high >60 2541 Due to LL, PI, swell& CBR Chiro wereda office to Care Ethiopia Road Segment 1 0+000 1+647 1.647 54- 23- 8.5- 0.8- 63 28 14.6 1.9 medium >60 25- Due to LL, 41 swell& CBR Therefore, this sections need to be treated and appropriate construction method shall be applied during construction 7.6 Pavement Design In the design of the pavement, the sub-grade design CBR values and Traffic classes obtained as discussed above will be used. The design is carried out by using ERA’s Flexible Pavement design manual (2013). 7.6.1 Pavement Design Using ERA’s Pavement Design Manual. According to the homogenous sub grade soil, the road segments are divided into Five sections. The five sections are from (km 0+000 to km 3+500, km 3+500 to km 6+208.54), (km 0+000 to km 3+500, km 3+500 to km 6+047.38), (Km 0+000 to Km 2+765.67, km 0+000 to km 0+855 km, km 0+000 to km 1+235.88, km 0+000 to km 1+235.88, 0+000 to km 1+040.14, 0+000 to km 0+518.98, km 0+000 to km 0+580 Km) with a design CBR value of 2 %, 14 %,2%,2% and 1% which are classified as S1, S4, S1, S1 and S1 sub grade classes, respectively, before treatment. However, after unsuitable sections are treated with better materials the sub grade class is improved to S4, S5, S3, S3 and S3, for the homogenous sections from (km 0+000 to km 3+500, km 3+500 to km 6+208.54), (km 0+000 to km 3+500, km 3+500 to km 6+047.38), (Km 0+000 to Km 2+765.67, km 0+000 to km 0+855 km, km 0+000 to km 1+235.88, km 0+000 to km 1+235.88, 0+000 to km 1+040.14, 0+000 to km 0+518.98, km 0+000 to km 0+580 Km, km 0+000 to km 1+647), respectively as per ERA flexible pavement design manual 2013. Engineering Works Consultant PLC. 169 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 The design CBR and the sub grade class before and after the treatment of the in-situ sub grade are given in the table below. Table 7- 82: Design CBR and sub grade class before and after treatment 90 percentile Homogeneous section CBR Value before Sub grade Class before treatment treatment 90 percentile 90 percentile CBR Value CBR Value after after treatment treatment I. Chiro town Adminstration to Mticho to Leila Road Segments Homogenous Section Determination Section I1 (Km 0+000– Km 3+500) 2% S1 8 S4 Section I2 (Km 3+500 – Km6+208.54) 14 % S4 19 S5 II. Muzi Tera to TTC to Qilisa Road Segments Homogenous Section Determination Section II3 (Km 0+000– Km 3+500) 2% S1 5 S3 Section II4 (Km 3+500 – Km6+047.38) 2% S1 5 S3 III.1 Hundi gudina School to Nejubas kidest Kidanmihiret Church Km 0+000 to Km 2+765.67 1% S1 5 S3 III.2 kebet tera to Chiro woreda office and Chiro wereda office to Care Ethiopia km 0+000 to km 1+235.88 and km 0+000 to km 1+647 1% S1 5 S3 S1 5 S3 III.3 Agricultural research center to Oda Bultu University km 0+000 to km 1+235.88 1% III,Hundi gudina School to Aschalew hotel, , , Blood bank to Genda to Quteba bono, to Sumeya bridge to Addis ketema and Agape hotel to Agri research center to TTC Road SegmentsDesign CBR of Homogenous Sections. Section III5 (, km 0+000 to km 0+855 km, 0+000 to km 1+040.14, 0+000 to 1% S1 5 S3 km 0+518.98, km 0+000 to km 0+580) According to the sub grade and traffic class presented for the sections of the road Segments, the pavement design of the road varies with the traffic class T5, T4, T3 and T2/LV5 as table 4-6 above. Whereas the sub grade class are S3, S4 and S5 for the different sections of the road. The table here under presents the sub grade and traffic class as determined above. Table 7- 83: summery of sub grade and traffic class for the section of the road Segments. 90 Homogeneous section CBR percentile 90 percentile Traffic class Value CBR Value after after treatment treatment I. Chiro town Adminstration to Mticho to Leila Road Segments Homogenous Section Determination Engineering Works Consultant PLC. 170 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 90 Homogeneous section CBR Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 percentile 90 percentile Traffic class Value CBR Value after after treatment treatment Section I1 (Km 0+000– Km 3+500) 8 S4 T2/LV5 Section I2 (Km 3+500 – Km6+208.54) 19 S5 T2/LV5 II. Muzi Tera to TTC to Qilisa Road Segments Homogenous Section Determination Section II3 (Km 0+000– Km 3+500) 5 S3 T5 Section II4 (Km 3+500 – Km6+047.38) 5 S3 T5 III.1 Hundi gudina School to Nejubas kidest Kidanmihiret Church Km 0+000 to Km 2+765.67 5 S3 T2/LV5 III.2 kebet tera to Chiro woreda office and Chiro wereda office to Care Ethiopia km 0+000 to km 1+235.88 and km 0+000 to km 1+647 5 S3 T5 S3 T3 III.3 Agricultural research center to Oda Bultu University km 0+000 to km 1+235.88 5 III,Hundi gudina School to Aschalew hotel, Blood bank to Genda to Quteba bono, to Sumeya bridge to Addis ketema and Agape hotel to Agri research center to TTC Road SegmentsDesign CBR of Homogenous Sections. Section III5 (, km 0+000 to km 0+855 km, 0+000 to km 1+040.14, 0+000 to km 0+518.98, km 5 S3 T4 0+000 to km 0+580) The ESAL for the road segments of Chiro town administration to Mitcho to leila is 0.656 Million. Even though 0.656 million ESAL is at the border of T3 traffic class, and manuals recommend to take the next traffic class in such cases. The above table indicates the combination of the homogenous sub grade class with that of the Traffic class as studied by the consultant Hence, the road Segments are designed using ERA Flexible Pavement Design Manual, 2013, Chart B1 with thin (50mm) Flexible AC Surfacing, Granular Road Base to meet the desired pavement surfacing thickness to withstand the traffic load in the design period. The thicknesses as adopted from the charts is presented in the tables below. Engineering Works Consultant PLC. 171 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 7- 84: Pavement thickness as per ERA 2013 Flexible Pavement Design Manual Chart B1 Pavement Layer Thickness (mm) Sub grade Traffic Station Design Sub Sub grade CBR grade at 93% MDD class Surfac Sub Improv course base ed sub ing AC CBR >1 CBR > grade (mm) class Base 00% 30% CBR > (mm) (mm) 15% Remark I. Chiro town Adminstration to Mticho to Leila Road Segments Homogenous Section Determination Section I1 (Km 0+000– Km 3+500) ERA PDM, 8 S4 T3 50 175 150 - 2013, Chart B1 Section I2 (Km 3+500 – Km6+208.54) ERA PDM, 19 S5 T3 50 150 100 - 2013, Chart B1 II. Muzi Tera to TTC to Qilisa Road Segments Homogenous Section Determination Section II3 (Km 0+000– Km 3+500) ERA PDM, 5 S3 T5 50 175 325 - 2013, Chart B1 Section II4 (Km 3+500 – Km6+047.38) ERA PDM, 5 S3 T5 50 175 325 - 2013, Chart B1 III.1 Hundi gudina School to Nejubas kidest Kidanmihiret Church Km 0+000 to Km 2+765.67 ERA PDM, 5 S3 T3 50 175 225 - 2013, Chart B1 III.2 kebet tera to Chiro woreda office and Chiro wereda office to Care Ethiopia km 0+000 1+235.88 to and km ERA PDM, km 5 S3 T5 50 175 325 - 0+000 to km 1+647 2013, Chart B1 III.3 Agricultural research center to Oda Bultu University km 0+000 to 1+235.88 km ERA PDM, 5 S3 T3 50 175 225 - 2013, Chart B1 III,Hundi gudina School to Aschalew hotel, Blood bank to Genda to Quteba bono, to Sumeya bridge to Addis ketema and Agape hotel to Agri research center to TTC Road SegmentsDesign CBR of Homogenous Sections. Section III5 (, km 5 S3 T4 Engineering Works Consultant PLC. 50 175 275 - 172 ERA PDM, Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Pavement Layer Thickness (mm) Sub grade Traffic Station Design Sub Sub grade CBR grade at 93% MDD Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 class Surfac Sub Improv course base ed sub Remark ing AC CBR >1 CBR > grade (mm) class Base 00% 30% CBR > (mm) (mm) 15% 0+000 to km 0+855 2013, km, Chart B1 0+000 1+040.14, km to km 0+000 to 0+518.98, km 0+000 to km 0+580) * According to ERA 2013 pavement design manual, up to 100mm of sub base may be substituted with selected fill provided the sub base is not reduced to less than the road base thickness or 200mm whichever is greater. The substitution ratio of sub base to selected fill is 1 to 1.3. Hence, with improved sub grade (capping) material, the layer thickness can be as given in the table below. Table 7- 85: Pavement thickness as per ERA 2013 Flexible Pavement Design Manual Chart B1 Pavement Layer Thickness (mm) Sub grade Traffic Station Design Sub Sub grade CBR grade at 93% MDD class Surfac Sub Improv course base ed sub ing AC CBR >1 CBR > grade (mm) class Base 00% 30% CBR > (mm) (mm) 15% Remark I. Chiro town Adminstration to Mticho to Leila Road Segments Homogenous Section Determination Section I1 (Km 0+000– Km 3+500) 8 S4 T3 50 175 150 - ERA PDM, 2013, Chart B1 Section I2 (Km 3+500 – Km6+208.54) 19 S5 T3 50 150 100 - ERA PDM, 2013, Chart B1 II. Muzi Tera to TTC to Qilisa Road Segments Homogenous Section Determination Section II3 (Km 0+000– Km 3+500) 5 S3 T5 50 175 200 150 ERA PDM, 2013, Chart B1 Section II4 (Km 3+500 5 S3 T5 Engineering Works Consultant PLC. 50 175 200 150 173 ERA PDM, Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Pavement Layer Thickness (mm) Sub grade Traffic Station Design Sub Sub grade CBR grade at 93% MDD Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 class Surfac Sub Improv course base ed sub ing AC CBR >1 CBR > grade (mm) class Base 00% 30% CBR > (mm) (mm) 15% – Km6+047.38) Remark 2013, Chart B1 III.1 Hundi gudina School to Nejubas kidest Kidanmihiret Church Km 0+000 to Km 2+765.67 5 S3 T3 50 175 150 100 ERA PDM, 2013, Chart B1 III.2 kebet tera to Chiro woreda office and Chiro wereda office to Care Ethiopia km 0+000 to 1+235.88 and km km 5 S3 T5 50 175 200 150 0+000 to km 1+647 ERA PDM, 2013, Chart B1 III.3 Agricultural research center to Oda Bultu University km 0+000 to km 1+235.88 5 S3 T3 50 175 150 100 ERA PDM, 2013, Chart B1 III,Hundi gudina School to Aschalew hotel, Blood bank to Genda to Quteba bono, to Sumeya bridge to Addis ketema and Agape hotel to Agri research center to TTC Road SegmentsDesign CBR of Homogenous Sections. Section km ERA PDM, 0+000 to km 0+855 2013, Chart km, III5 0+000 1+040.14, km (, to km 0+000 to 0+518.98, 5 S3 T4 50 175 200 100 B1 km 0+000 to km 0+580) 7.6.2 Design of Shoulder Shoulder is designed to provide lateral support for the pavement layers, and help in removal of surface water from the road surface and facilitates internal drainage of the pavement. Shoulders also give additional width for emergency and temporary parking. According to ERA Flexible Pavement Design Manual 2013; for a paved road it is usually economically justifiable to provide paved rather than unpaved shoulders. This is because it greatly improves pavement performance by ensuring that the zone of seasonal moisture variation does not penetrate to the outer wheel track and it: Engineering Works Consultant PLC. 174 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 i)....Reduces erosion of the shoulders (especially on steep gradients). ii)... Reduces maintenance costs by avoiding the need for re-gravelling at regular intervals. iii).. Reduces the risk of road accidents, especially where the edge drops between the shoulder and the pavement is significant or the shoulders are relatively soft (since the gravel surface wears out leading to edge drop, and becomes irregular and accumulates water to soften the pavement layers). In order to achieve the above objectives shoulder shall at least be sealed by Double Bituminous Surface Treatment (DBST), and sealed to a width of at least 1.0 from the edge of the sealed running surface. However, provision is often required for non-motorized traffic of various kinds and shoulder widths are variable (see ERA’s Geometric Design Manual), hence, the width of the sealed shoulder is also variable. Paved or sealed shoulders should be differentiated from the carriageway e.g. by the use of edge markings to avoid regular use of traffic. Moisture is the most important factor that affects pavement performance and long-term maintenance costs. Thus one of the significant challenges faced by the designers is to provide a pavement structure in which the detrimental effects of moisture are contained to acceptable limits. This situation therefore places extra emphasis on drainage and moisture control for achieving satisfactory pavement life. In this respect, two inter-related aspects of drainage need to be considered during road design: internal and external drainages. External drainage can be achieved by providing a carriageway and shoulder slopes which can help the shedding of water into the side drains. A suitable value for paved roads is about 2.5% to 3% for the carriageway, and 4-6% for the shoulders. On the other hand, internal drainage concerns about water that entered the road structure directly from above the road pavement or directly from below the pavement structures. Drainage within the pavement layers is an essential element of structural design since it is impossible to guarantee that road surfaces will remain waterproof throughout their lives. Shoulder design should therefore ensure that water is able to drain out quickly from within the pavement. This can be achieved by extending the pervious layers provided under the carriageway to the outer edge of the shoulder so that it can drain the engrossed water to the side ditch. Thus, the sub base and base course layers shall extend to the outer edge of the shoulder. Accordingly, the designed road shall have a shoulder thickness as indicated in the table below Table 7- 86: Shoulder Pavement thickness Engineering Works Consultant PLC. 175 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Pavement Layer Thickness (mm) Sub grade Traffic Station Design Sub Sub grade CBR grade at 93% MDD Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 class Surfac Sub Improv course base ed sub ing AC CBR >1 CBR > grade (mm) class Base 00% 30% CBR > (mm) (mm) 15% Remark I. Chiro town Adminstration to Mticho to Leila Road Segments Homogenous Section Determination Section I1 (Km 0+000– Km 3+500) ERA PDM, 8 S4 T3 DBST 175 150 - 2013, Chart B1 Section I2 (Km 3+500 – Km6+208.54) ERA PDM, 19 S5 T3 DBST 150 100 - 2013, Chart B1 II. Muzi Tera to TTC to Qilisa Road Segments Homogenous Section Determination Section II3 (Km 0+000– Km 3+500) ERA PDM, 5 S3 T5 DBST 175 200 150 2013, Chart B1 Section II4 (Km 3+500 – Km6+047.38) ERA PDM, 5 S3 T5 DBST 175 200 150 2013, Chart B1 III.1 Hundi gudina School to Nejubas kidest Kidanmihiret Church Km 0+000 to Km 2+765.67 ERA PDM, 5 S3 T3 DBST 175 150 100 2013, Chart B1 III.2 kebet tera to Chiro woreda office and Chiro wereda office to Care Ethiopia km 0+000 1+235.88 to and km ERA PDM, km 5 S3 T5 DBST 175 200 150 0+000 to km 1+647 2013, Chart B1 III.3 Agricultural research center to Oda Bultu University km 0+000 to km 1+235.88 ERA PDM, 5 S3 T3 DBST 175 150 100 2013, Chart B1 III,Hundi gudina School to Aschalew hotel, Blood bank to Genda to Quteba bono, to Sumeya bridge to Addis ketema and Agape hotel to Agri research center to TTC Road SegmentsDesign CBR of Homogenous Sections. Section III5 (, km 0+000 to km 0+855 5 S3 T4 Engineering Works Consultant PLC. DBST 175 200 100 176 ERA PDM, 2013, Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Pavement Layer Thickness (mm) Sub grade Traffic Station Design Sub Sub grade CBR grade at 93% MDD km, 0+000 1+040.14, km to km 0+000 to 0+518.98, Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 class class Surfac Base Sub Improv course base ed sub ing AC CBR >1 CBR > grade (mm) 00% 30% CBR > (mm) (mm) 15% Remark Chart B1 km 0+000 to km 0+580) * For ease of construction the shoulder at mountainous and escarpment sections should be AC surfacing. 7.7 Design for Geo-Hazards Geo-hazards can pose significant constraints to the construction and operation of road infrastructure, and are therefore critically important and should be considered in the design of roads. In Ethiopia, geology and tectonic setting, combined with climate and hydrology, create conditions that encourage the occurrence of a range of geo-hazards. These occur naturally and are often also triggered or exacerbated by road construction. These hazards can be grouped in to slope instability, seismic risk, presence of poor/weak or expansive and erodible soil and presence of water logged or swampy areas. All these geotechnical aspects investigated along the project road segments are discussed in the following sections. 7.7.1 Weak Subgrade Soil Sections The natural sub-grade soils of the project road segments are dominantly Dark brown to brown CLAY Soil. The road segments alignment with such unsuitable soil shall be removed and replaced with good material or shall be treated or modified. In addition, proper side and cross drainage shall be provided in order to avoid the risk of moisture fluctuation. The road sections with sub grade of weak and expansive nature are shown below along with corresponding degree of expansiveness. In order to access the unsuitableness of soils, attention has to be given to those sections where LL is > 60, PI is > 30%, CBR swell is > 3.0% and CBR is < 3%, as stated in the ERA Standard Technical Specification and Method of Measurement for Road Works 2013, section 4103 (a). Accordingly, sections where PI >30 %, LL>60%, CBR<3% and CBR swell > 3.0% are identified, as given in Table 5.1 below. Table 7- 87: Weak and/or Expansive subgrade stretches in the road segments of the project Engineering Works Consultant PLC. 177 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Limits Sr. New Station Interval No From To LL PI Swell CBR for of Remark Degree of degree Expansion expansion ** Km LL PI Chiro Town Administration to Mtichu to Lelia 1 0+000 0+700 0.7 55 23 5 2 Medium >60 25-41 2 1+500 2+100 0.6 55 29 9.4 1.4 Medium >60 25-41 3 2+100 3+000 0.9 63 34 0.9 14.9 >60 25-41 high to Very high Due to PI, swell Due to Swell &CBR Due to LL, PI Muze tera to TTC to Qilisa road segment Due 1 0+450 0+700 0.25 62 31 10.3 1 high >60 15-28 to PI LL, ,Swell &CBR 0+700 1+300 0.6 48 24 5 4 high >60 25-41 3 1+300 1+700 0.4 51 24 4 3 Medium >60 25-41 4 2+400 3+200 0.8 54 23 5.6 2.1 Medium >60 25-41 5 3+200 3+700 0.5 57 28 6.3 2.2 high >60 25-41 6 4+100 6+047 1.947 58- 25- 2.2- 63 32 4.9 2.8-8 high >60 25-41 Due to Swell to LL, &CBR Due swell& CBR Due to LL, swell& CBR Due to LL, swell& CBR Due to LL, swell& CBR Hundi gudina School to Nejubac Kidest kidan mihiret Church road segment 1 0+000 2+536 2.536 54- 23- 7.1- 1.08- 72 38 10.8 2.2 Very high >60 25-41 Due to LL, PI, swell& CBR Agricultural research center to Oda Bultu Universtity to Main Asphalt road road segment 1 0+000 0+400 0.4 62- 29- 6- 1.4- high 75 41 11.4 2.42 Very high Engineering Works Consultant PLC. to >60 25-41 Due to LL, PI, swell& CBR 178 Expansive(Unsuitable section) 2 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Limits Sr. New Station Interval No From To LL PI Swell CBR of Remark Degree of degree Expansion expansion ** Km 2 0+400 1+000 0.6 3 1+000 1+236 0.236 62- 29- 6- 1.4- 75 41 11.4 2.42 62 28 9 1 for LL PI Very high >60 25-41 Very high >60 25-41 Very high >60 25-41 Due to LL, PI, swell& CBR Due to LL, PI, swell& CBR Hundi gudina School to Aschalew Hotel road segment 1 0+000 0+855 0.855 54- 28- 3.4- 1.4- 64 31 10.8 3.22 Due to LL, PI, swell& CBR Blood bank to Genda to Quteba Bono road segment 1 0+000 1+022 1.022 52 24 7 1 medium >60 25-41 2 0+000 0+153 0.153 56 25 6 3 medium >60 25-41 3 0+000 0+141 0+141 45 21 2 4 medium >60 25-41 4 0+000 0+214 0.214 52 24 7 1 medium >60 25-41 5 0+000 0+096 0.096 56 25 6 3 medium >60 25-41 Very high >60 25-41 Very high >60 25-41 medium >60 25-41 Due to LL, PI, swell& CBR Due to LL, PI, swell& CBR Due to LL, PI, swell& CBR Due to LL, PI, swell& CBR Due to LL, PI, swell& CBR Sumeya bridge to Addis ketema Road segment 1 0+000 0+524 0.524 67 36- 8.8- 1.1- 37 9.4 1.4 Due to LL, PI, swell& CBR Agape Hotel to Agricultural research center to TTC Road segment 1 0+000 0+584 0.584 54- 28- 60 30 11 1.11.4 Due to LL, PI, swell& CBR Chiro wereda office to Care Ethiopia Road Segment 1 0+000 1+647 1.647 54- 23- 8.5- 0.8- Engineering Works Consultant PLC. Due 179 to LL, Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Limits Sr. New Station Interval No From To LL PI Swell CBR of Remark Degree of degree Expansion expansion ** Km LL 63 28 14.6 for PI 1.9 swell& CBR **LL limits and PI limits for low, medium and high degree of expansion are as per figure 7.8 and Table 7.1, respectively, of ERA Site Investigation manual, 2013. 7.7.2 Treatment of Weak subgrade and/or expansive clay soils From the above table it can be seen that there are expansive and/or weak sub grade soils along Chiro Town Internal Asphalt road project (km 0+000 to km 6+208.54, km 0+000 to km 6+047.38, Km 0+000 to Km 2+765.67, km 0+000 to km 0+855 km, km 0+000 to km 1+235.88, km 0+000 to km 1+235.88, 0+000 to km 1+040.14, 0+000 to km 0+518.98, km 0+000 to km 0+580). Therefore, attention shall be given to those expansive and weak sub grade soil sections to improve their bearing capacities and soil consistency to avoid the detrimental effect to the pavement layers. There are expansive clay soil sections observed on the road segments of the project, and the test results confirmed the same. Therefore, the following treatment measures can be employed to mitigate its detrimental effect to the pavement layers. The proposed treatment methods are as per provisions of ERA Site Investigation Manual, 2013, ERA Flexible Pavement Design Manual, 2013 and ERA Low Volume Roads Manual 2011.The treatment methods is irrespective of the degree of expansion of the in-situ sub grade soil. 7.7.3 a) Treatment method for weak subgrade sections: Provide a minimum earth work cover of 1000mm with non-expansive material with minimum CBR value for the sub grade class determined for the respective homogeneous sections of the road. b) If the fill above the natural ground is less than 1000mm, the in-situ material shall be cut to a depth of 1000-x, where x is the fill above the natural ground. 7.7.4 Treatment method for expansive clay soil sections: This method shall be provided as per the design manuals mentioned above, as follows: a) Where the finished road level is designed to be less than 2m above ground level, remove the problem soil to a minimum depth of 600mm over the full width of the road, but ensure a minimum earth work cover of 1000mm below the pavement layers; Engineering Works Consultant PLC. 180 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 b) Where the finished road level is designed to be greater than 2m above ground level, remove the problem soil to a depth of 600mm below the ground level under the unsurfaced area of the road; c) Where the expansive soil does not exceed 1m in depth, remove it to its full depth. d) Stockpile the excavated material on either side of the excavation for subsequent spreading on the fill slopes. e) The excavated area shall be backfilled with a non-expansive material of CBR value greater or equal to the minimum CBR value for the sub grade class for the respective homogeneous sections of the road, and compacted to a density of 95% modified AASHTO. f) After the excavated material has been replaced with non-expansive material in 200mm lifts to 95% modified AASHTO density, the road shall be brought to finished level in approved materials, with a side slope of 1:2 or as indicated on the Drawing. All other requirements for pavement layers shall be complied with as specified. g) The previously stockpiled expansive soil should then be spread over the slope (side fill) so as to produce as flat a slope as possible (1V:6H or 1V:4H depending on the fill height)). h) Provision of side drain should be avoided unless absolutely necessary. Where it is necessary, it should be as shallow as possible and as far from the toe of the embankment as possible, as indicated in the typical drawings. 7.7.5 Erodible Soil Sections There are road side and center gully erosion sections along the designed road segments of the project (Tab 5.2). This is due to the presence of erodible soil and unprotected surface flow causing deep gullies along the existing road, where some of the project road segments alignment also designed to pass through it. The presence of gully erosion along the sides of the alignment identified should be taken as an indication that the whole topographic unit in which it is occurring may be susceptible to erosion. The stretches and recommendation are provided in the tables below. Table 7- 88: Existing gully locations along the proposed road 7.7.6 Treatment method for erodible soils Engineering Works Consultant PLC. 181 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 The following treatment methods can be employed at where soils are susceptible to erosion 1. If gullies are already formed, they need to be backfilled layer by layer with borrow materials. 2. The side drains (longitudinal ditches) in these section shall be lined irrespective of the longitudinal slope. 3. Turn outs shall be constructed in short possible intervals to avoid concentrated flow of water. Secondary ditches and check dams shall be constructed to dissipate the energy of storm water running parallel to the road. 4. Proper protection works shall be constructed at culvert inlets and outlets and at approaches. 7.7.7 Swampy or Water Logged Sections During site reconnaissance visit and site investigation time the team try to identify this Swampy/water logged problematic section but not find it along the road segments of the project. 7.7.8 Treatment of Swampy Sections The following treatment measures can be employed to mitigate the detrimental effect of water to the pavement layers. The sub grade shall be raised to a minimum fill height of 2 meters above the natural sub grade. The bottom 600 mm fill shall be constructed with rock fill which consists of boulders and gravels and the embankment above the rock fill shall be constructed by a selected material with a minimum CBR of the sub grade class for the respective sections of the road segments, and the fill shall be constructed in such a way that relatively coarser materials are placed on top of the rock fill and selected materials on the top of the courser materials. The top layer of the rock fill should not reach an elevation 600 mm below the finished sub grade. In no case shall the sub grade layer be less than 400 mm above the top of the rock fill. 7.8 Construction Material Investigation. 7.8.1 General Detailed investigation of material sources plays an important role in assisting the design of cost effective pavements by enhancing efficient use of the locally available construction materials. The construction materials investigation undertaken for the design of the road involved searching for and identification of suitable borrow pits and quarries which could provide an adequate quality and quantity of road construction materials within the vicinity of the road project. After identifying the potential material sources representative samples were taken for laboratory testing to establish the quality and suitability of the locally available road construction materials. Engineering Works Consultant PLC. 182 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Estimates of quantity was carried out for rock, gravel and borrow materials. This is done with the aid of hand held GPS to record the coordinate of the boundaries of the suitable materials. Area of the material is then calculated from the coordinates and the depth of usable material is measured from the test pits, and the quantity estimated from the area and the depth of the usable material. The depth of overburden material is also estimated and evaluated if the suitable material can be exploited economically. The potential sources of construction materials in the vicinity of the project area was investigated through the following activities: Interaction with local people and relevant bureau: Local people in the vicinity of the route and relevant bureau such as rural road authorities were enquired about the existence of potential sources of construction material. Field survey for potential sources: All potential sources were visually inspected and evaluated. Samples were taken where the material was considered suitable for the intended purpose. Laboratory tests were conducted on material samples: This was carried out to assess the material quality and compare the results with the required materials specifications. In general, prior to locating each kind of construction materials the following factors were considered: Performance of the materials which were used for the construction the existing road; Accessibility; Quantity and Quality; Type and thickness of overburden materials; Availability of adequate space for erecting crusher and stockpiling; and Environmental and social aspects Taking into account these factors Six (6) potential sources of construction materials were located, which include possible sources of rock, natural gravel sources, and water. Moreover, representative samples were collected from those sources for further investigation of their quality in the laboratory. 7.8.2 Rock Sources for Surfacing, Base, Concrete and Masonry Works During the field investigation, the quality and quantity of rocks, accessibility of the quarry locations, the overburden material depth and the suitability of the material for construction purposes are well assessed. Besides, the environmental and social impacts which may arise following the utilization of the rock quarry like displacement of local residents, claim for farm lands are assessed. Possible rock sources for aggregate for asphalt concrete, base course, concrete and masonry works are available within reasonable hauling distance. The quantity of available material has also been Engineering Works Consultant PLC. 183 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 estimated. Ease of mining and development of quarry faces and suitability to erect a crusher plant have been considered as additional factors. Two (2) quarry sites and one masonry stone source are Sampled from 3 quarry and one masonary identified source along the road project which is considered as suitable by visual inspection which can likely be sources of base course, asphalt concrete, surfacing, concrete aggregates and masonry stone. From both source representative samples are collected to be tested at central laboratory to confirm their suitability for the intended purposes. The formation and characteristics of the rock sources along the road corridor is fresh to slightly weathered Basaltic formation for Aggregate quality test and Ignimbrite rock type for Masonry. Representative sample has been taken from the identified sources for further laboratory testing. Table 7- 89: Locations of Quary Materials Identified along the Road Segments Offset Sn Statio No n (Km) 1 1+800 1.4km offset 2 5+713 0.1kmOffset RHS 3 2+300 4 0+700 Offset from road segment LHS Coordinates Muzi tera - E=707556 TTC - Qilisa N=1004148 Muzi tera TTC - Qilisa Chiro town 0.1Km offset, Administration RHS&LHS – Mtichu-Leila Kebt tera – 0.05km offset Chiro Wereda LHS Office E=707361 N=1001434 E=702894 N=1005055 E=705480 N=1003320 Engineering Works Consultant PLC. Co de Q1 Q2 Description Source Test Required slightly AC/Base Weathered course basaltic rock AC/Base basaltic rock course Quantity (Existin g/New) plenty New Limited Existing Q3 basaltic rock AC/Base course plenty new Q4 slightly Weathered rock Masonry Limited Existing 184 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Figure 7- 9: crushed aggregate(Crusher site) and Quarry site for Base course at station 5+818 offset 0.15km RHS and 1+8 offset 1.2Km LHS with in vicinity of Road Segments 7.8.3 Natural Gravel for Subbase, Capping Layer and Embankment The project road shall be constructed to the required standard that requires adequate quantity of materials for strong lower pavement layers at reasonable intervals. Special attention is therefore given to locating natural gravel sources that can be used for this pavement layers (i.e., sub base and capping layers). Grey GRAVEL SILTY with SAND & CLAY and brown weathered GRAVEL silty clay sources could be identified at the Vicinity for all road segments. However, natural granular materials that comply with specification requirements for their use as sub base layers without further processing are often rare. This is mainly due to inconsistency in their grading as a result of frequent change in weathering pattern and extreme variability of geological processes that are responsible for their present state of occurrences. The locations of some road segments lie with in Chiro town. Therefore, there is no construction material along the road segments corridor and assessed around the vicinity of the town. The quality of the materials exhibits significant variation within a source that consideration has been given to selective production, and sampling of the materials has been carried out accordingly. Accordingly, four (4) sources of natural gravel materials have been located and all source samples were taken from the borrow sites within the vicinity of the road Segments. Summary of the natural gravel sources is given in table below. The laboratory test results of natural gravels are presented in Annex -III of this report. Table 7- 90: Locations of Natural Gravel Materials Identified along the Road Segments Borrow source Sn No Stati on Offset from Coordinates Offset (Km) 4+90 m 0 Code Required Muzi tera - E=706721 Highly to moderately TTC - Qilisa weathered N=1001999 offset, B1 LHS 2 Description segment 0.05k 1 road 1+80 1.4 Muzi tera - E=707556 0 TTC Km - N=1004148 B6 Engineering Works Consultant PLC. rock mixed with silty clay soil. Source Test Quantity (Existing /New) Sub base/Cap plenty Existing ping / Fill Moderately Sub Too weathered gravel base/Cap plenty 185 New Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Borrow source Sn No Stati on Offset from Coordinates Offset (Km) road Code Description Required segment LHS Qilisa Source Test silty clay soil Quantity (Existing /New) ping / Fill offset 0.1Km 3 town E=702894 2+60 offset, Administrati 0 RHS& on – Mtichu- LHS Leila 0.2km Chiro 0+82 offset 0 4 Chiro 1+26 0 N=1005055 Highly to moderately B2 weathered mixed with rock gravel silty clay soil Sub base/Cap plenty new limited Existing plenty new ping / Fill town E=704221 Administrati LHS & on – Mtichu- N=1005421 B4 Highly weathered Capping / rock silty clay soil Fill RHS Leila 0.05k Chiro m Administrati offset on – Mtichu- RHS& Leila gravel silty clay soil Blood Bank- Highly to moderately RHS, Genda- weathered rock Sub 0.1Km Kuteba mixed with base/Cap offset Bono town Highly to moderately Sub B3 weathered rock base/Cap ping / Fill LHS 5 1+24 0 B5 sandstone new Limited gravel ping / Fill silty clay soil Figure 7- 10: 4+900 Offset 0.1Km LHS Subbase Figure 7- 11: 2+600 Offset 0.14Km LHS towards, Engineering Works Consultant PLC. 186 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. existing source 7.8.4 Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Sub base New source Natural Sand Sources /Fine Aggregate Natural sand is not available within the project area. The Chiro town communities Would have used from mieso river sand (23km from chiro town), therefore we recommended to use this source with crushed sand by appropriate blending 7.8.5 Water Sources for Construction Since water is necessary for compaction, mortar and concrete works attempt was made to locate perennial rivers and ground water locations on the Vicinity of project road Segments that can be used as a source of water for construction. Accordingly, one (1) water source of Perennial River is identified and representative sample was collected from the River for laboratory tests. There is a sufficient water source for Chiro Town Internal Asphalt Road project. Sample was collected from the river source to check the quality of the river water if it can be used for the intended construction purposes. The water source quality tests like PH, total dissolved solids, Chloride and Sulphate contents. The laboratory test results are attached in Annex -III. Table 7- 91: Water source On the Vicinity of Road Segments. Ref. Station No. W1 cross road GPS Coordinate Chainage segment 0+370 Muzi tera - TTC - E=705300 Qilisa N=1005052 Engineering Works Consultant PLC. Chiro river Offset/ Type Distance Material cross road River segments 187 Water. of Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 8 GEOTECHNICAL DESIGN 8.1 Geological Setting 8.1.1 Geological Setting of the Project Area Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 The project is located in Western Harari Zone of Oromia Region. The project road covers approximately 20Km and connects Chiro town governmental and community institutions of the western hararge main Ethiopian rift. The terrain dominated with volcanic rocks that contain variable magdala group (basalts, rhyolite & trachytic tuff, ignimbrites, rhyolite, trachyte, agglomerates,), Afar group. Miocene-Pleistocene (Basalts, subordinate acid lavas, ignimbrites and Ashangi Groups. Paleocene-Oligocene-Miocene (a. Alkali olivine basalts& tuffs, rare Rhyolites; b. Doleritics sills & gabbro-diabase intrusives. in addition, the valleys and rolling terrains are covered mainly by in-situ residual soils and some colluvium deposits which rich in clay and organic minerals. The proposed Road segment routes are mainly volcanic rocks consist of three mapped units, which are categorized on the basis of fissural and fault mode of volcanic activity as magadala group (upper Miocene –Pleistocene), Ashangi Groups. Paleocene-Oligocene-Miocene (a. Alkali olivine basalts& tuffs, rare Rhyolites; b. Doleritics sills & gabbro-diabase intrusives and Afar group. MiocenePleistocene (Basalts, subordinate acid lavas, ignimbrites. magadala group (upper Miocene –Pleistocene): this group consist basalts, rhyolite & trachytic tuff, ignimbrites, rhyolite, trachyte, agglomerates. It outcrops consisting of alternating flows, ranging in thickness. It is fine to coarse grained, light to dark grey, slightly to moderately weathered. Ashangi Groups. Paleocene-Oligocene-Miocene (a. Alkali olivine basalts& tuffs, rare Rhyolites; b. Dolerites sills & gabbro-diabase intrusives. It outcrops consisting of alternating flows, ranging in thickness. It is fine to coarse grained, light to dark grey, slightly to moderately weathered. Afar group. Miocene-Pleistocene. Basalts, subordinate acid lavas, ignimbrites. It is complexes which are situated along the axial zones of the Main Ethiopia Rift and Afar Depression.it has Light grey to grey colour forming thick mass flows. Engineering Works Consultant PLC. 188 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Figure 1. 1: Geological map of the project area scale 1: 250,000 (Aman et al., 2012). LEGEND Pga ,NQa& NM Ashangi Groups. Paleocene-Oligocene-Miocene, Afar group. MiocenePleistocene and Magdala group. upper Miocene –Pleistocene 8.1.2 Local Road Corridor Geological Settings Site visit was carried out to assess the local geology, structural setting, geomorphological process and availability of suitable materials for construction. Fieldwork is the second stage of investigation where thoughts or facts collected & discovered during the desktop study needed to be proved or disproved with the aid of field visual observations. In line with this, careful site observations have been conducted in conjunction with the regional geology of the project area to identify the local geological formations and if there exist any areas slopes which are susceptible to instability. Accordingly, the sections of the road project are covered mainly by Ashangi Groups. PaleoceneOligocene-Miocene (a. Alkali olivine basalts& tuffs, rare Rhyolites; b. Dolerites sills & gabbro-diabase intrusives followed by Afar group. Miocene-Pleistocene. Basalts, subordinate acid lavas, ignimbrites and a local geological formation is presented below. Engineering Works Consultant PLC. 189 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Photo 1. 1: slightly weathered Basaltic Rhyolite rock in the road corridor (left) and fresh Basaltic rock (right) in the vicinity exposed The moderately to slightly weathered Basaltic & Basaltic Rhyolite rocks can be used as sources for fresh Aggregate &crushed sand depending on their state of weathering and fracturing. In most cases, Dark brown to brown silty clay soils overlaid the Basaltic rock formations. 8.2 Seismic Setting and Earthquake Hazards Seismic survey has not been carried out in the project area or in the immediate vicinity. However, a number of seismic surveys by different local and foreign researchers (e.g. IGSSA of Addis Ababa University, Ethiopia-Afar Geoscientific Lithospheric Experiment (EAGLE, 2001-2003), etc.) have been carried out for several years in the Main Ethiopian Rift (MER). As a result, earthquake epicentres are mainly located in the MER (Fig. 1.7/1.8), where tectonics and volcanism is somewhat active. As indicated, on the seismic zone map of Ethiopia, the project road Segments are transverses through Zones 2 and 3. In this seismic sensitive zone, it is generally the case that extreme events of load combination, taking into account the seismic load effects, may govern the substructure design. Engineering Works Consultant PLC. 190 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Project Figure 1. 2: Magnitudes of earthquake in East Figure 1. 3: Seismic Hazard Zoning Map of Africa Ethiopia (EBCS-8) Table 1. 8: Bedrock Acceleration Ratio Zone 4 3 2 1 α 0.10 0.07 0.05 0.03 Therefore, it advisable to check the stability of the structure against seismic effects and appropriate seismic design considerations shall be taken especially for main bridges into account during the design stage by following the seismic design procedure as specified in ERA Bridge Design Manual 2013, EBCS-8, 1995 and/or AASHTO LRDF bridge design specification and other relevant specification. 8.3 Site Reconnaissance for Slope Stability The project road traverses through flat, rolling and mountainous terrain where light to dark brown silty clay soils are dominantly encountered. During the site visit it is observed that most section of the road alignment is stable with regard to slope stability related problems. 8.4 Problematic Sub-Grade Soil Sections 8.4.1 Expansive and/or Weak subgrade sections Some section of the road alignment is exhibited expansiveness and/or weak sub grade soil nature and which may require replacement or high fill. The table below lists Problematic/poor subgrade soil sections. Engineering Works Consultant PLC. 191 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Table 8- 1: List of problematic subgrade sections Sr. No New Station Interval From To LL PI Swell CBR Km Degree of Expansion Limits for degree of expansion ** LL Remark PI Chiro Town Administration to Mticho to Lelia 1 0+000 0+700 0.7 55 23 5 2 Medium >60 2 1+500 2+100 0.6 55 29 9.4 1.4 Medium >60 3 2+100 3+000 0.9 63 34 0.9 14.9 high to Very high >60 25- Due 41 to swell 25- Due 41 2541 to Swell & CBR Due to LL, PI Muze tera to TTC to Qilisa road segment 1 0+450 0+700 0.25 62 31 10.3 1 high >60 2 0+700 1+300 0.6 48 24 5 4 high >60 3 1+300 1+700 0.4 51 24 4 3 Medium >60 4 2+400 3+200 0.8 54 23 5.6 2.1 Medium >60 5 3+200 3+700 0.5 57 28 6.3 2.2 high >60 6 4+100 6+047 1.947 58- 25- 2.2- 63 32 4.9 2.8-8 high >60 15- Due 28 2541 to LL, PI, Swell&CBR Due to Swell &CBR 25- Due to LL, swell& 41 CBR 25- Due to LL, swell& 41 CBR 25- Due to LL, swell& 41 CBR 25- Due to LL, swell& 41 CBR Hundi gudina School to Nejubas Kidest kidan mihiret Church 0+000 2+536 2.536 54- 23- 7.1- 1.08- 72 38 10.8 2.2 Very high >60 25- Due 41 to LL, PI,swell& CBR Agricultural research Center to Oda Bultum Universtity to Main Asphalt road 1 0+000 0+400 0.4 2 0+400 1+000 0.6 3 1+000 1+236 0.236 62- 29- 6- 1.4- high 75 41 11.4 2.42 Very high 62- 29- 6- 1.4- 75 41 11.4 2.42 62 28 9 1 Engineering Works Consultant PLC. to >60 Very high >60 Very high >60 25- Due 41 to LL, PI, swell& CBR 25- Due 41 LL, PI,swell& CBR 25- Due 41 to to LL, swell& CBR 192 PI, Expansive(Unsuitable section) 1 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Hundi gudina School to Aschalew Hotel 1 0+000 0+855 0.855 54- 28- 3.4- 1.4- 64 31 10.8 3.22 Very high >60 25- Due 41 to LL, PI,swell& CBR Blood bank to Genda to Quteba - Bono 1 0+000 1+022 1.022 52 24 7 1 medium >60 2 0+000 0+153 0.153 56 25 6 3 medium >60 3 0+000 0+141 0+141 45 21 2 4 medium >60 4 0+000 0+214 0.214 52 24 7 1 medium >60 5 0+000 0+096 0.096 56 25 6 3 medium >60 Very high >60 25- Due 41 to PI, to LL, to LL, PI, swell& CBR 25- Due 41 LL, PI,swell& CBR 25- Due 41 PI, swell& CBR 25- Due 41 LL, swell& CBR 25- Due 41 to to LL, PI, swell& CBR Sumeya bridge to Addis ketema Road segment 1 0+000 0+524 0.524 67 36- 8.8- 1.1- 37 9.4 1.4 25- Due 41 to LL, PI, swell& CBR Agape Hotel to Agricultural research center to TTC Road segment 1 0+000 0+584 Total length 0.584 54- 28- 60 30 11 1.11.4 Very high >60 25- Due 41 to LL, PI,swell& CBR 13.688 Km (67%) In order to reduce the risk of future effect of the expansive on the performance of the pavement, the following remedial measures shall be undertaken: i) Where the finished road level is designed to be less than 2m above ground level, remove the problem soil to a minimum depth of 600mm over the full width of the road, j) Where the finished road level is designed to be greater than 2m above ground level, remove the problem soil to a depth of 600mm below the ground level under the unsurfaced area of the road structure; k) The material for replacement shall have minimum four days soaked CBR of not less than 5% (with two surcharge rings) at a modified AASHTO density of 95% of MDD. l) After the excavated material has been replaced with non-expansive material in 200mm lift to 95% modified AASHTO density, bring the road to finished level in approved material. m) Partial replacement of swelling sub grade material with fill quality material and the replacement thickness is 600mm plus a minimum of 400mm earthwork cover and the width depending on embankment height, Engineering Works Consultant PLC. 193 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 n) Provision of slope flattening with side slope (1:4 or 1:6) using the excavated expansive soil for side fill. o) Provision of side drain should be avoided unless absolutely necessary. Where it is necessary, it should be as shallow as possible and as far from the toe of the embankment as possible, as given in the drawing referred above. 8.5 Near Surface Ground water/ Swampy Section During reconnaissance survey, there were no swampy areas along and at the sides of the road project. 8.6 Erodible Soil Sections where gullies are formed due to severe erosion aggravated by either the nature of the subgrade material or absence of proper longitudinal drainage systems are identified at a few locations along the proposed alignment. Hence, gullies may be formed during and after construction due to disturbance by construction activity. Table 8- 2: Erodible soil section (Formation of Gully) Gully Sections S. No. Station, Km Position Extent, m dimension, (deep/wide) m Recommendation Start End 1 0+500 0+600 RHS 100 1.0/2.0 Treatment method listed below 2 0+950 1+000 RHS 50 1.0/1.0 Treatment method listed below Figure 8- 1: Erodible soil section (gully section) The following treatment methods can be employed at where soils are susceptible to erosion 1. If gullies are already formed, they need to be backfilled layer by layer with borrow materials. 2. The side drains (longitudinal ditches) in these section shall be lined irrespective of the longitudinal slope. Engineering Works Consultant PLC. 194 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 3. Turn outs shall be constructed in short possible intervals to avoid concentrated flow of water. Secondary ditches and check dams shall be constructed to dissipate the energy of storm water running parallel to the road. 4. Proper protection works shall be constructed at culvert inlets and outlets and at approaches. 8.7 Design of Embankments, Cuttings and Retaining Structures 8.7.1 Design of Embankments The basic geotechnical design issues for fill slope/ embankment include bearing capacity, slope stability and long and short term settlement. The design issues are often controlled by the engineering characteristics of the geologic material below the fill rather than property of the fill. Consequently, geotechnical desk and field study of the project road for fill slope/ embankment focus on characterization of the existing foundation materials, and engineering design evaluation as how these existing materials respond to the load from the new fill. If an acceptable response is predicted, methods of improving the soil below the fill to achieve performance may be required before the fill is constructed. The focus of the fill/ embankment design study, however, can be on the embankment fill performance where embankment side slope is steep in relation to the shear strength of the anticipated fill material or where light weight fill rather than mineral fill will be used for the embankment. For fill/ embankment slope design, the primary design consideration is the potential slope stability and bearing capacity failures which can occur during construction, causing construction slowdown and contract claims. Settlements beneath the embankment following construction can result in poor ride quality of the roadway leading to long term maintenances requirement and premature pavement failure. The embankment design is carried out considering the following; The required height of embankment and available width for embankment, The type of soil supporting the embankment, The end of construction, long term operational loading and seismic loading, The location of ground water table, For the design of fill / embankment of the project road, the subsequent design criteria for settlement, side slope stability and bearing capacity of embankments/ fill slope given in the table below. Table 8- 3: Design criteria for settlement, side slope stability and bearing capacity of embankments Design Component Mode of Failure Minimum Factor Engineering Works Consultant PLC. Maximum Permissible Movements of 195 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Safety Vertical Lateral Differential 1.1 Local Global Stability 1.3 Unreinforced Fill slopes Slopes 1.2 Bearing Reinforced Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 or Treated Slopes 1.1 Local Global Stability 1.5 Fill slopes 1.2 Bearing Capacity 3.1 Bearing (short term) 3.2 Local & Global Slope Embankment on Soft Ground 2.0 Stability (long term) 1.5 1.4 1.2 For the design years post construction settlement: (i) within 10m from bridge approach < 100mm (ii) road< 250mm Reinforced Fill Walls External Stability ± 5mm per ± 15mm from alignment / Internal Stability metre height reference Structures According to ERA Geotechnical Design manual, embankments over 5m heights are considered as high fill. For the project road Segments, high fill sections are identified and tabulated below: Table 8- 4: High fill sections along the road project Muze tera to TTC to Qilisa road segment Sumeya bridge to Addis ketema segment S.no Station(km) Fill Height(m) S.no Station(km) Fill Height(m) 1 0+260.00 8.168 1 0+840.00 5.251 2 0+280.00 10.485 2 0+860.00 6.906 3 0+300.00 12.354 3 0+880.00 8.395 4 0+320.00 13.514 4 0+900.00 8.982 5 0+340.00 14.775 5 0+920.00 9.352 6 0+360.00 16.655 6 0+940.00 9.501 7 0+380.00 22.169 7 0+960.00 9.344 8 0+400.00 16.27 8 0+980.00 9.481 9 0+420.00 16.854 9 1+000.00 9.822 10 0+440.00 16.653 10 1+020.00 11.871 11 0+460.00 16.166 11 1+040.00 8.491 12 0+480.00 15.711 12 1+060.00 8.011 13 0+500.00 13.887 13 1+080.00 7.287 Engineering Works Consultant PLC. 196 Road Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 14 0+520.00 11.611 14 Hundi Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 1+100.00 gudina 6.201 School to Nijubas 15 0+540.00 10.428 Kidest kidan mihiret Church 16 0+560.00 9.047 S.no Station(km) Fill Height(m) 17 0+580.00 9.041 1 2+500.00 5.787 18 0+600.00 7.341 2 2+520.00 9.77 19 0+620.00 5.291 3 2+540.00 5.916 20 5+120.00 10.867 4 2+560.00 5.885 21 5+140.00 7.063 5 2+580.00 5.727 22 5+160.00 6.035 6 2+600.00 5.635 23 5+420.00 7.475 7 2+620.00 5.364 24 5+440.00 11.009 Chiro Town Administration to Mticho to Lelia 25 5+460.00 16.111 S.no Station(km) Fill Height(m) 26 5+480.00 19.528 1 3+900.00 5.773 27 5+500.00 9.704 2 3+920.00 7.567 28 5+780.00 13.781 3 3+940.00 6.83 29 5+800.00 7.813 4 3+960.00 5.776 30 5+820.00 4.9 5 3+600.00 6.639 6 3+620.00 11.556 7 3+640.00 13.703 8 3+660.00 11.159 9 3+680.00 5.436 For the high fill sections with the slope of the existing ground greater than 25%, the existing ground shall be excavated to form horizontal benches. Each bench shall be excavated as the fill material is compacted and the embankment is raised. Benching shall be a minimum of 3 meters in width in order to integrate the new embankment with the existing slope. This requirement shall also apply to embankments constructed on rock. Table 2. 1: Slope Ratio Table – Vertical to Horizontal Engineering Works Consultant PLC. 197 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Note * (1:3 means 1 vertical to 3 horizontal) ** (Flatter slope shall be applied for slide prone back slopes). 8.7.2 Design of Cuttings The primary geotechnical design criteria for cut slope (both for soil and rock slope) is the stability of back slope. The stability assessments require characterization of the geologic layers and groundwater condition of the existing materials. The geotechnical design activities focus on the evaluation of short and long term stability for different ground water, material strength and seismic load assumptions. If slope stability is in adequate, improvement procedures typically involves flattening slopes, drainage improvements and use of retaining walls or some type of ground improvements. For cut slopes, a primary design consideration is the potential failures of slopes during construction or operation which may represent life safety risk. If slope movement are slow, the primary problem could be long-term maintains requirement to remove earth or rock as it is encroaching on the roadway. Generally, because of the inherent variability of geologic materials, the design of each slope is, however, unique. The design of cut slope for the project road made through acquiring of the following input data A thorough understanding of the surface and sub-surface stratigraphic and geological structures A knowledge of the underground water level, source and flow paths, A confident estimate of the probable mode of failure of the cut, A reliable estimate of the range of material properties involved in any possible failure, An acceptable minimum value for the required factor of safety or acceptable risk which takes in to account the economic consequence of precautionary measure and the consequence of failure. Engineering Works Consultant PLC. 198 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 8.7.3 Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Safe Angle of Cut Slope and Berms The existing natural slope angles represent the maximum stable slope angle for a back slope. The maximum slope angle and the stable slope height reflect the strength parameters of cohesion and friction and the ground water conditions as well as the effects of erosion, especially at the toe. The cut and back slope ratio given in the table below is recommended considering site conditions, material type and cost. a) Unreinforced cuts: The maximum vertical height of any single continuous cut batter shall, in most cases, not exceed 10.0 m. A minimum 3.0 m wide bench shall be provided for erosion control, control of rock falls and maintenance purposes at the top of any 10.0 m high single continuous cut batter. Cuts in readily erodible or dispersive geological materials may require different strategies, e.g., flattening without benches. b) Reinforced cuts: reinforced (e.g., soil nail/rock dowel walls) cut batter slopes shall not be steeper than 10 (vertical) to 1 (horizontal). c) The cut back slope ratio given in the table below will be repeated after introduction of cut bench at every 10 meter cut height for soil and weathered rocks. The bench should be 3m wide and it has a gutter ditch, lined with cement mortar stone pitching or concrete, having 1.0m width, as shown on drawings. For the design of cut slopes of the project road, the subsequent design criteria for slope stability given in the tables below. Table 8- 5: Design Criteria for Cut Slope Stability Design Component Minimum Mode Of Failure Safety Unreinforced Local & Global Stability Slopes Cut slopes Reinforced Treated Slopes Factor or Local & Global Stability (cut & fill slopes) of Maximum Permissible Movements Vertical Lateral 1.3 1.5 Table 8- 6: Slope Ratio Table – Vertical to Horizontal Engineering Works Consultant PLC. 199 Differential Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Note Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 * (1:3 means 1 vertical to 3 horizontal) ** (Flatter slope shall be applied for slide prone back slopes) 8.7.4 Recommended Back Slopes for the Project Alignment During project site visit, the back slope of the existing road has been evaluated with respect to the material type on the slope. The material Descriptions along the project road Segments are classified as below table to recommend for stability of the slopes. The following table gives recommended back slopes for each road Segments. Table 8- 7: Recommended back slope ratio Muze tera to TTC to Qilisa road segment Sr. Station Interval Length Back Excavation No From To Km Visual Material Description on surface Slope type 1 0+000 0+450 0.45 Light grey brown, silty CLAY soil Earth Slope Normal 2 0+450 0+700 0.25 Light brown to brown, silty CLAY soil Earth Slope Normal 3 0+700 1+300 0.6 Light grey to dark brown, silty CLAY Earth Slope underlying by whitish grey intermediate highly weathered to decomposed rock 4 1+300 1+700 0.4 Dark brown clay underneath reddish grey Earth Slope Normal silty clay soil 5 1+700 2+400 0.7 Moderately to highly weathered rock silty Earth Slope intermediate clay soil 6 2+400 3+200 0.8 Light brown to reddish brown silty clay Earth Slope underneath Reddish grey highly weathered to Decomposed rock with gravel Engineering Works Consultant PLC. 200 Normal 7 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 3+200 Black 3+700 0.5 Black clay to Dark brown clay with silt cotton Normal slope 8 3+700 5+100 1.4 Light grey highly weathered rock gravel Earth Slope intermediate silty clay soil 9 5+100 6+047 0.947 Dark brown to Black clay underlying brown Black silty clay soil with gravel cotton Normal slope Kebet tera to Chiro wereda office Road segment Sr. Station Interval Length Visual Material Description on surface Back Excavation No From To Km Slope type 1 0+000 0+700 0.7 Light grey to dark brown, silty CLAY soil Earth Slope Normal 2 0+700 1+000 0.3 Light grey, silty CLAY soil underlying silt Earth Slope Normal stone 3 1+000 1+238 0.238 Black cotton clay soil Black cotton Normal slope Sumayo bridge to Addis ketema Road segment Road segment Sr. Station Interval Length No From To Km 1 0+000 0+524 0.524 Visual Material Description on surface Back Excavation Slope type Light grey to dark brown, CLAY soil ‘with Earth Slope Normal silty Agape Hotel to Agricultural research center to TTC Road segment Sr. Station Interval Length No From To Km 1 0+000 0+584 0.584 Visual Material Description on surface dark brown to Black , silty CLAY soil Back Excavation Slope type Earth Slope Normal Agricultural research center to Oda Bultu University to Main Asphalt Road segment Sr. Station Interval Length No From To Km 1 0+000 0+400 0.4 2 0+400 3 1+000 Visual Material Description on surface Back Excavation Slope type dark brown to brown , silty CLAY soil Earth Slope Normal 1+000 0.6 dark brown to Black , CLAY soil with silty Earth Slope Normal 1+236 0.236 dark brown, CLAY soil with silty Earth Slope Normal Back Excavation Slope type Chiro Town Administration to Mticho to Lelia Road segment Sr. Station Interval Length No From To Km 1 0+000 0+700 0.7 Visual Material Description on surface dark brown to Reddish brown, silty CLAY Earth Slope Normal soil 2 0+700 1+000 0.3 Grey highly weathered to decomposed Earth Slope rock , silty CLAY soil with gravel Engineering Works Consultant PLC. 201 intermediate Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 3 1+000 1+500 0.5 Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Brown to Light grey ,SILTY CLAY soil Earth Slope Normal underlying Reddish grey highly weathered to Decomposed Rock 4 1+500 2+100 0.6 Reddish grey Decomposed Rock ,SILTY Earth Slope Normal CLAY soil overlay with brown clay soil 5 2+100 2+500 0.4 Reddish grey Moderately to highly Earth Slope intermediate weathered Rock gravel SILTY CLAY soil 6 2+500 6+513 4.013 Grey Slightly to Moderately weathered Rock Hard Rock Rock underlying Fresh basaltic rock Hundi gudina to Nijubas Kidest kidan mihiret Church Road segment Sr. Station Interval Length No From To Km 1 0+000 2+536 2.536 Visual Material Description on surface light grey to Dark Brown SILTY CLAY soil Back Excavation Slope type Earth Slope Normal Back Excavation Slope type Hundi gudina to Aschalew Hotel Road segment Sr. Station Interval Length No From To Km 1 0+000 0+855 0.855 Visual Material Description on surface dark brown to Black , CLAY soil with SILT Earth Slope Normal Blood bank toGenda to Quteba Bono Road segment Sr. Station Interval Length No From To Km 1 0+000 1+022 1.022 2 0+000 3 Back Excavation Slope type dark brown, CLAY soil with SILT Earth Slope Normal 0+153 0.153 dark brown, CLAY soil with SILT Earth Slope Normal 0+000 0+141 0+141 dark brown, CLAY soil with SILT Earth Slope Normal 4 0+000 0+214 0.214 dark brown, CLAY soil with SILT Earth Slope Normal 5 0+000 0+096 0.096 dark brown, CLAY soil with SILT Earth Slope Normal 8.7.5 Visual Material Description on surface Method of Rock Excavation The fact that Chiro town Adminstration to Mticho to Leila Road Segment alignment traverse through and over the rolling and mountainous section where seismic hazardous of Earthquake expected to occur in a magnitude of Bed Rock acceleration 0.05 and 0.07 PGA m/s2 from the km 2+500 to Km 6+513 of Road Segment section, the excavation method of hard rock is significant for the instability of cut slope during and after construction. There are few sections that required excavation of moderately weathered and fractured rocks which are indicated in the soil extension given above. These rock masses are easily disturbed during blasting at the time of construction and by active earthquake after construction. Therefore, Engineering Works Consultant PLC. 202 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 excavation in moderately weathered and fractured even hard rocks sections need to be carried out systematically so that the rock mass does not disturbed significantly. Mechanical breaking can also be used in the case of known instability. 8.7.6 Design of Retaining Structures Retaining walls are common feature of road construction in mountainous regions. They are constructed for the following situations: to support a road either wholly or partly on fill when the ground profile is too steep to support the toe of a slope that has failed or is likely to fail to support cut slopes that would otherwise require a gentle, uneconomic angle of cut when there are constraints on the permissible plan extent of earthworks, as on hairpin bends, or hairpin stacks Three types of retaining walls can be proposed in this project: Mortared masonry retaining wall, Gabion retaining wall and Reinforced earth retaining walls. The advantage and disadvantage of each type are presented below: Mortared Masonry Retaining Walls Mortared masonry walls are the most durable of the low cost wall options. They are especially suited to steep rocky ground where foundations are shallow and where the contractor's working area is restricted. Masonry walls are not tolerant of differential settlement. Their lack of structural flexibility and general impermeability, even with freely-draining back fill and weep holes, make these walls inappropriate on wet colluvial slopes and where ground movements are expected. Considering these characteristics, Mortared Masonry Retaining wall is proposed on fill side where there is good foundation material with a maximum height of 9m. Gabion Retaining Walls Gabion walls are usually preferred under conditions of poor foundation, wet soils, high groundwater and slope movement due to creep, land sliding and seismicity. Gabion walls have the following characteristics: they can accommodate settlement without rupture they allow free drainage through the wall they can be constricted in short sections (2-3m at a time) which minimizes the temporary loss of slope support during excavation the shape of a gabion structure can easily be varied to accommodate changes in ground conditions across the site a gabion structure is easy than a masonry structure to fit into an irregular foundation because of the standard size and rectangular shape of the boxes Engineering Works Consultant PLC. 203 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 However, the density of gabion work is approximately 70% that of mortared masonry and hence a gabion wall has to be larger in volume for the same retained height. This increase in size could be a factor in the choice of wall type in situations where cross-sectional space is limited. Considering these characteristics, Gabion Retaining wall is proposed on all colluvium/scree deposits on cut sides where seepage of water is expected. The maximum height of gabion wall shall be 10m. Gabion retaining walls could also be considered in river training activities and flood protection works. Slope Protection Methods of slope protection comprise drainage control and surface treatments for soils and weathered rock that include masonry revetments and the use of vegetation and less conventional slope coverings including geotextiles, and bituminous fabrics. Among these, the use of vegetation, masonry revetments and drainage control are the most common in road construction in Ethiopia. Vegetation Vegetation is a very desirable means of providing slope protection for reasons of availability, relatively low cost, appropriateness of installation techniques and compatibility with a rural environment. It is particularly appropriate in situations where large areas of slope are affected, a common situation on road cuttings and over unstable mountain slopes. Vegetation of embankment slopes is most rapidly achieved by planting with grass slips, by the spreading of collected topsoil containing roots and seeds. The principal advantages of vegetation from a slope protection point of view are: The presence of a vegetation cover protects the soil against rain splash and erosion, and prevents the movement of soil particles down slope under the action of gravity. Vegetation increases the soil infiltration capacity, helping to reduce the volume of runoff. plant roots bind the soil and can increase resistance to failure, especially in the case of loose, disturbed soils and fills plants transpire considerable quantities of water, reducing soil moisture and increasing soil suction In view of the above, it is evident that vegetation is important in the control of erosion and shallow forms of instability, and protect them from scour and disruption, and prevent damage to the slope generally. The general characteristics required of bio-engineering plants are: they should be adapted to the growing conditions of the general environment, as well as those of the individual site rapid growth long-living substantial root system Engineering Works Consultant PLC. 204 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 easy to propagate 8.7.7 Drainage Controls Surface drains are frequently constructed on hillsides, for purposes of slope stabilization, together with berms and/or across the top of a cutting to prevent surface runoff from eroding freshly exposed materials and to minimize saturation of slopes. In the latter case, they are usually constructed behind the top of the excavation. They are normally built as a trench, lined with mortared masonry or unlined depending on the amount of water and soil type. Factors to be considered in the design of surface drains water collected by the drain must be discharged safely, in a manner that will not initiate erosion elsewhere construction of masonry-lined drains should be limited to undisturbed slope materials differential settlement, which frequently occurs in man-made ground and particularly at the interface between natural ground and fill, will lead to rupture drain gradients should not exceed 10° stepped drain outlets should be provided with a cascade down to the collection point drains should discharge into a stream channel wherever possible, and preferably into channels that already convey a sizeable flow in comparison to the drain discharge low points in the drain system should be designed against overtopping by widening or raising the sidewalls lengths of drain should be kept short by the construction of frequent outlets in order to reduce erosion potential Where it is not practicable to discharge cut-off drainage into an adjacent stream channel, cascades or chutes can be constructed down the cut slope to convey water into the side drain. However, these structures are often vulnerable to the effects of side splash, undermining by seepage erosion and concentrated runoff along their margins. They must be designed to contain the water, and their margins must be protected with vegetation or stone pitching In the project road Segments, grouted stone pitched cut-off drains are proposed over erodible soil sections to minimize erosion and over colluviums section to minimize slope saturation. 8.8 Bridge Foundation Investigation 8.8.1 General Field investigation for bridge foundation was carried out on major river crossing sites. The objectives of the investigation are: To identify the type, character, and extent of the sub-surface formations prevailing at the crossing sites, Engineering Works Consultant PLC. 205 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 To assess the strength of the foundation materials so that identification and determination of the bearing layer, bearing depth, allowable soil pressure and type of foundation can be made. There are Four major crossing sites along the road Segments, as indicated in table below. Table 8- 8: Lists of Major Crossing Sites No. Station No.of Span Span Length (m) Total Length (m) Name of Road Segment 1 0+210 1 7 7 Sumaeya Bridge to Addis ketema 2 1+055 1 25 25 kebet tera to Chiro woreda office 3 0+345 1 24 24 Muzi tera to TTC to Qilisa 4 5+480 1 10 10 Muzi tera to TTC to Qilisa 5 0+160 1 12 12 8.8.2 Field Investigation Hundi gudina school to Nejubas kidest Kidane mihiret Church During site visit for site investigation work, locations of the bridge crossings were inspected and relevant data to help assess the foundation condition of the bridge locations has been collected. Only field observation has been carried out for this Design report. Detail investigation shall be carried out during construction phase. It was observed that the foundation of bridges at km 0+210, km 1+025, km 0+420 and 0+160 are bedded Segmented fine to course Sandstone gravel with silt overlain by dark to Light grey brown silty clay soil and foundation of bridges at km 5+480 is bedded Sedmented fine to course gravel with Sand silt overlying by light brown silty clay soil. There is an existing bridge at km 0+210 and km 1+055. Bridge Crossing at Km 0+420 and km 5+480 for Muzi tera to TTC Road Segment This the first major river crossed by the road alignment. The stream is characterized by a trapezoidal shaped valley with medium deep banks. The bank material on both sides is Light grey brown to brown silty clay soil and sedmented round gravel. There is no existing bridge at this location. The second major river crossing stream is characterized by a trapezoidal shaped valley with a shallow bank. The bank material on both sides is Sedmented fine to course gravel with sand silt overlying by light brown to Reddish brown silty clay soil. Large basaltic cobblestone rocks are observed at the bed of the river. There is no existing bridge at this location. Engineering Works Consultant PLC. 206 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Figure 8- 2: River crossing at Km 0+420 Figure 8- 3: River crossing at Km 5+480 (chiro River (chiro River side bank) side bank) Bridge Crossing at Km 1+025 for kebte tera to Chiro wereda office Road Segment This is the only major river crossed by this road Segment. The stream is characterized by a trapezoidal shaped valley with medium deep banks. The bank material on both sides is Light grey brown to brown silty clay soil and sedmented round gravel. There is an existing bridge at this location. The condition of the sub structure is Fair to poor; no cracks are observed on the abutment and scouring is noted. Figure 8- 4: River crossing at Km 1+055 Bridge Crossing Km 0+210 for to Sumeya Bridge to Addis ketema Road Segment Engineering Works Consultant PLC. 207 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 This is the only major river crossed by this road Segment. The stream is characterized by a trapezoidal shaped valley with medium deep banks. The bank material on both sides is Light grey brown to brown silty clay soil and sedmented round gravel. There is an existing bridge at this location. The condition of the sub structure is Fair to poor; no cracks are observed on the abutment and scouring is noted Figure 8- 5: River crossing at Km 0+210 Bridge Crossing Km 0+160 for Hundi gudina School to Nejubas Kidest Kidane mihiret Chuech Road Segment This is the only major river crossed by this road Segment. The stream is characterized by a trapezoidal shaped valley with medium deep banks. The bank material on both sides is Light grey brown to brown silty clay soil and sedmented round gravel. There is an existing bridge at this location. The condition of the sub structure is Fair to poor; no cracks are observed on the abutment and scouring is noted Figure 8- 6: River crossing at Km 0+160 DCP Testing The Dynamic Cone Penetrometer (DCP) was initially developed in South Africa for in-situ evaluation of pavement (Kleyn, 1975). Since then, it has been widely used in all over the world for site Engineering Works Consultant PLC. 208 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 characterization of subsurface materials. The DCP has proven to be an effective tool in the assessment of in-situ strength of pavement and subgrade in highway construction. DCP testing has also been used for borrow pit location and determination of overburden thickness. DCP is typically used in horizontal construction applications, such as pavements, building, Bridges, Culvert’s foundation and floor slabs. Standard DCP apparatus with the following features has been used during the site investigation. • 8 kg hammer freely falling from a height of 575 mm • 60° cone having a diameter of 20 mm • Extension rods The DCP is held vertically and the test is conducted by dropping the hammer from 575 mm. While the cone penetrates through the ground, the depth of penetration with set number of blows was read in mm from a fixed meter ruler. The number of blows has been adjusted depending on the resistance of the ground under testing. Then the penetration rate, PR (sometimes referred as DCP ratio, or penetration index PI) is calculated. The DCP ratio is defined by the slope of the curve relating the number of blows to the depth of penetration (in mm/blow) at a given linear depth segment. Figure 8- 7: Schematic representation of DCP DCP tests were conducted on both abutments of the Bridge foundation positions. The test locations were excavated on each abutments sides that are besides of the existing structures of a rectangular area having 2m X 2m X 2m dimensions. Moreover, DCP testing was conducted inside test pit Engineering Works Consultant PLC. 209 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 excavated after excavated 2m depth of the top soil. DCP tests conducted in the bottom layer are ended up with refusal in some pits and considered as N-50. Bearing Capacity Recommendation and Analysis of bridge Bearing Capacity Analysis from DCP This section focuses on comprehensive description and explanation of the outcomes of subsurface investigations based on visual observation, test pitting, DCP test and bearing capacities computations. To measure the in situ strength of the sub surface material of the Bridge’s foundation, DCP tests were carried out in each test pit position. The choice of a particular type of foundation depends on the magnitude of the structural loads, the nature of the subsurface strata and loading. In terms of their seating depths within subsurface, these are categorized as shallow and deep (pile) foundations. For reasons of economy, shallow foundation is the first logical choice unless it is considered inadequate bearing capacity. As far as the shear strength of the foundation layers of the Bridge considered as determined from DCP testing and visual observation, all of the foundation grounds of the proposed Bridge can accommodate shallow foundations. The allowable bearing pressure is the maximum net intensity of loading that can be imposed on the soil with no possibility of shear failure or the possibility of excessive settlement. The outcome from the DCP test is intended to measure the ground resistance and converted it into SPT N-30 (number of blows required to penetrate 30cm during Standard Penetration Test) using the correlation developed by TRRL, Overseas Road Note-9, Design of Small Bridges 1992 or TRL, A Design Manual for Small Bridges, 2000. Accordingly, mm/blow obtained from DCP test can be converted into SPT N-30 by the following formula (N-30) is limited to a maximum of 50. The result of the DCP test is plotted using excel where by layers with nearly similar resistance have been identified. N-30 = 240.88*(mm/blow) ^- 0.97 Table 8- 9: Typical Correlation between DCP and SPT-N Values DCP value mm/blow 5 6 7 8 9 10 12 14 16 18 20 SPT value blows/300mm 50 44 38 33 28 24 22 18 16 15 14 Engineering Works Consultant PLC. 210 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Figure 8- 8: Graphic form of DCP to SPT N-30 The summaries of the ground resistance as measured by DCP tests and converted into an equivalent N-30 is shown in Tables below and the plot of penetration resistance; total blows against depth are included as annex. Table 8- 10: Summaries of DCP test results and SPT N-values of each Bridge Staio n Pit Name Road segments of Locati on Start side 0+34 5 Muzi tera to TTC to Qilisa End side 5+48 0 Layer s Depth from top(m) Layer Average Thickne penetration ss(mm) (mm)/blow DCP CBR TO SPT 1 0.85 915 15.09 17.15 17.44 2 1.76 915 11.73 22.37 22.58 3 2.68 4 126.3 121.2 1830 2.28 5 3 3.59 1830 3.16 89.62 86.86 5 4.01 2250 3.92 71.20 69.47 1 0.85 915 16.90 15.21 15.53 2 1.76 910 10.58 24.95 25.10 3 2.27 1425 8.50 31.4 31.43 0.85 920 22.37 11.3 11.65 Design SPT 30 26 Start side Rock End 1 Engineering Works Consultant PLC. 211 25 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. side Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 2 1.07 215 7.68 35.0 34.88 1 0.84 910 23.89 10.5 10.89 203.1 Start side 0+21 Sumeya Bridge 0 Addis ketema to End side Start 1+05 Kebet tera to Chiro side 5 woreda Office 2 1.77 930 1.38 215.1 9 121.5 3 2.75 1899 2.27 126.7 6 4 3.65 1821 3.21 88.0 85.34 5 4.02 2269 3.84 72.8 70.99 1 0.80 910 9.13 29.2 29.21 2 1.84 910 8.94 29.8 29.86 3 2.70 1815 9.84 26.9 27.06 4 3.57 1820 7.71 34.9 34.73 5 4.32 2565 7.65 35.1 35.00 1 0.91 905 14.60 17.8 18.05 2 1.82 910 8.58 31.1 31.11 3 1.99 1080 7.29 37.0 36.78 1 0.5 495 9.90 26.8 26.88 1 0.85 915 21.13 12.0 12.35 2 1.63 910 13.24 19.7 19.94 130.6 Start side 0 32 31 End side 0+16 30 Hundi gudina school to Nejubas kidane mihiret 3 2.54 1830 2.12 136.5 6 4 3.82 2185 3.25 86.9 84.33 5 4.16 2170 3.99 70.0 68.30 1 0.85 915 10.30 25.7 25.80 2 1.84 990 13.38 19.5 19.73 113.5 End side 3 2.75 1830 2.43 118.1 1 4 3.67 1905 3.23 87.4 84.72 5 4.58 2740 4.15 67.2 65.65 27 30 30 According to the DCP data analysis, the bearing capacities most of the Bridge are very high value due to the presence of coarse-grained material makes irregularities of the ground. Thus, average of the N-30 value used for safe design (N-55). The outcome from the DCP test is intended to measure the ground resistance and converted it into SPT N-30 (number of blows required to penetrate 30cm during Standard Penetration Test) using the correlation developed by bowls 1997, 5th edition. Thus, Engineering Works Consultant PLC. 212 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 bearing capacity of the subsurface materials are computed based on the DCP N-30 values obtained. The summaries of the test results are presented in the table 3-2 above. The bearing capacity computations are addressed in detail as follows. q a ( kPa ) N K d , B ≤ F4 F1 2 N B F3 q a (kPa ) Kd F2 B , B > F4 Where, qa = Allowable Bearing Capacity for 25mm settlement in KPa Kd = 1+0.33D/B < 1.33 F2 = 0.08 F3 = 0.3 F4 = 1.2 B = Width of foundation D = Depth of Footing in m As far as settlement is concerned, the Bowels method is empirically obtained for a settlement of 1” (25mm). Table 8- 11: Summary of bearing capacity Obtained from DCP Test for each Bridge based on N55 Staion, Road Km segment Name 0+420 1+055 Recommended Width, m Depth, m 2 Start Qall in KPa @ side 3.0m End Qall in KPa @ Muzi tera to TTC side 3.0m to Qilisa Start Qall in KPa @ side 2.0m End Qall in KPa @ side 2.0m Start Qall in KPa @ 5+480 0+210 Position Sumeya Bridge side to Addis ketema 3.0m End Qall in KPa @ side 3.0 m Kebet tera to Chiro Start 2.5 3 3.5 4 4.5 5 5.5 6 660 626 603 567 541 521 505 492 482 580 550 531 499 475 458 444 433 424 660 595 554 525 505 489 477 467 459 541 487 454 431 414 401 391 383 376 660 626 603 567 541 521 505 492 482 709 672 649 609 581 559 542 529 518 Qall in KPa @ 681 646 623 586 558 538 521 508 497 Engineering Works Consultant PLC. 213 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Staion, Road Km 0+160 segment Name Position Recommended Width, m Depth, m 2 woreda side 3.0 m Office End Qall in KPa @ side 3.0m Hundi gudina Start school to side Nejubas kidane End mihiret side 8.9 Qall in KPa @ 3.0m Qall in KPa @ 3.0m 2.5 Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 3 3.5 4 4.5 5 5.5 6 591 561 541 508 484 466 452 441 432 660 626 603 567 541 521 505 492 482 660 626 603 567 541 521 505 492 482 Conclusion Based on the analyses and interpretations made so far, the Geotechnical parameters are presented in table 3-6 above. As a whole the formation in the study area is soil with insignificant to significant variation in soil strengths. The allowable pressure, for the selected bearing layer and depth is determined by analysis of field DCP N value taking the minimum safe value. if unforeseen weak soil or expansive clay material is encountered during construction, replace the foundation material with a CBR Value Greater than or equal to 30% Sub-base material and then compacted to 97% of the MDD at each compacted layer with a thickness of 20cm to avoid a possibility of differential settlements due to void spaces inside the gravel /boulder’s material. However, the structural engineer can choose among the given list of bearing capacity in table 3.3 above to meet his requirement with the appropriate footing width and depth of foundation. Furthermore, the geo-technical Engineer in charge of the project may alter (increase or decrease) the level of footing recommended here based on the actual material type to be revealed/ encountered during excavation. Engineering Works Consultant PLC. 214 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 9 STRUCTURAL DESIGN 9.1 General Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Structures in road projects mainly consist of drainage structures and retaining walls for stability of slopes. They are one of the most important elements of road construction. The serviceability of a road is highly influenced by the absence of proper drainage structures and lack of properly located stabilizing structures. They mainly include culverts, bridges, energy dissipation structures and retaining walls. Highway Drainage facilities are designed to convey predetermined discharges in order to avoid a significant flood hazard on the road. The hydrological and hydraulic analyses for the section of the road project have been conducted through careful examination, review and analysis of the relevant hydro-metrological data, topographical maps, aerial photographs and other imageries. Accordingly, there are 71 drainage structures in all road segment. Of these, 5 are Bridges, 12 are reinforced concrete slab culverts, and the remaining 54 are reinforced concrete pipe culverts. 9.2 Structures Design Standard The design of the bridges is conducted based on AASHTO LRFD Bridge Design Manual 2013 and the new Ethiopian Roads Authority Bridge Design Manual (ERA BDM-2013) which has been recently developed based on AASHTO LRFD Bridge Design Specification, 2004. As per ERA BDM-2013, the design vehicle load for maintenance and extension of existing bridges shall be HS-25 and HL-93 for the design of new bridges. The new Vehicular load, HL-93, consists of “Design Truck” or “Design Tandem” loaded simultaneously with lane load. 9.2.1 Methodology The Bridges are designed for specified limit states to achieve the objectives of constructability, safety, and serviceability, with due regard to issues of ease for inspection, economy, and aesthetics. The design is based on Load and Resistance Factor Design (LRFD), as presented in the both Specifications. Load and Resistance Factor Design (LRFD) takes into account both the statistical mean resistance and the statistical mean loads. The fundamental LRFD equation includes a load modifier (η), load factors (γ), force effects (Q), a resistance factor (φ), a nominal resistance (Rn), and a factored resistance (Rr = φRn). LRFD provides a more uniform level of safety throughout the entire bridge, in which the measure of safety is a function of the variability of the loads and the resistance. The substructure is designed to sustain all the worst conditions imposed by the load multiplied by the applicable load factors. Foundation is designed to support all loads in accordance with general principles specified in the references for strength and stability. 9.2.2 Loading Engineering Works Consultant PLC. 215 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Based on the requirements of the ERA Bridge Design Manual - 2013, the following permanent and transient loads and forces are considered in the design. 9.3 Permanent Loads a. Dead load of structural components and non-structural attachments (DC). As the structures are constructed with reinforced concrete and stone masonry, this load is dead load of concrete (unit Weight 24KN/m3) and Masonry (unit Weight 27KN/m3). b. Dead load of wearing surfaces and utilities (DW). Bituminous Wearing surfaces have been assumed on deck surfaces as a wearing surface (unit weight 22.5 KN/m3) for future provisions. c. Vertical pressure from dead load of earth pressure (EV). Rolled Gravel or Hand Laid Rock Ballast as earth fill material is assumed (unit weight taken is 19.5 KN/m3). d. Horizontal Earth pressure Load (EH). Lateral earth pressure is assumed for walls backfilled with earth. The walls are reviewed and designed assuming that they can move away from the soil mass. The coefficient of lateral earth pressure will be determined from the permitted backfill materials. 9.4 Transient loads As per ERA BDM-2013, and ASHTO LRFD 2004 the design vehicle load for the design of new bridges shall be HL-93 for. The new Vehicular load, HL-93, consists of “Design Truck” or “Design Tandem” simultaneously loaded with a lane load. Whichever design loadings creating the maximum effect was considered in the design of the bridges. Axle weights and spacing axles as specified in ERA Bridge Design Manual -2013. a. Designs truck Load. Total of design truck is 325 KN distributed between 3 axles. Front axle loading is 35KN and two rear axles loading is 145 KN each. Distance between front and first rear axle is 4.3m. The distance between two rear axles varies from 4.3 to 9m to produce extreme force effects. Engineering Works Consultant PLC. 216 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Figure 9- 1: Designs truck b. Design tandem load. Design tandem load is exceptional loading and shall be applied for military vehicle loading and for strategic bridges. Design tandem comprised of a pair of 110KN axles spaced at 1.2m. Each axle comprised of two wheels spaced at 1.8m transversely. Figure 9- 2: Designs tandem c. Design Lane Load. Design lane load consist of 9.3 KN/m, uniformly distributed longitudinally. Transversely, the load is assumed to occupy a 3.0m width. d. Pedestrian load. A pedestrian load of 4 KN/m2 is applied to all walkways wider than 0.6m. They are considered to act simultaneously with the vehicular design live load. 9.5 Environmental Effects Engineering Works Consultant PLC. 217 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Environmental effects are those resulting from natural effects such as wind, temperature and seismic events. a) Wind It has been assumed that the base wind speed for structures (VB) is 145 km/h. b) Temperature A temperature range from 5o to 35oC has been assumed in the design of critical elements. For the calculation of effects due to temperature gradients through superstructures the appropriate values are: T1 = 35oC, T2 = 10oC, T3 = 5oC c) Seismic Effects The project traverses in the areas of the country defined as zone 0, which is the lowest seismic activity region. As a result, seismic analysis is not required but minimum support width of 0.5m will be adopted at all connections. d) Water Loads Longitudinal Stream Pressure The pressure of flowing water acting in the longitudinal direction of substructures shall be taken as: p = 5.14*10-4 CDV2 (3.9) Where: p = pressure of flowing water (MPa) CD = drag coefficient for piers as specified in Table 11.1 V = design velocity in m/s of water for the design flood in strength and service limit states and for the check flood in the extreme event limit state (see ERA Drainage Design Manual-2013, Chapter 5: Hydrology). Table 9- 1:: Drag Coefficient Type CD Semi-circular-nosed pier 0.7 Square-ended pier 1.4 Debris lodged against the pier 1.4 Wedged-nosed pier with nose angle 90o or less 0.8 Engineering Works Consultant PLC. 218 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 The longitudinal drag force shall be taken as the product of longitudinal stream pressure and the projected surface exposed thereto. Where a significant amount of driftwood is carried, water pressure shall also be considered for on a driftwood raft lodged against the pier. Lateral Stream Pressure The lateral, uniformly distributed pressure on substructure due to water flowing at an angle, θ, to the longitudinal axis of the pier (see Figure 11-3) shall be taken as: PL = 5.14 x 10-4CLV2 (3.10) Where: PL = lateral pressure (MPa) CL = lateral drag coefficient specified in Table below. Figure 9- 3: Plan View of Pier Showing Stream Flow Pressure Table 9- 2: Lateral Drag Coefficient Angle between direction of flow and longitudinal axis of the pier CL 0o 0.0 o 1 0.5 10o 0.7 20o 0.9 >30o 1.0 The lateral drag force shall be taken as the product of the lateral stream pressure and the surface exposed thereto. 9.5.1 Materials The structural materials generally used for design of structures in this project are reinforced concrete and stone masonry. Concrete and masonry are the preferred material for construction of Bridges and culverts; however, other materials may be more suitable for a particular location, hydraulic roughness, bedding condition, or project. In evaluating the suitability of alternate materials, the selection process was based on a comparison of the total cost of alternate materials over the design life of the structure that is dependent upon the following: Engineering Works Consultant PLC. 219 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Durability (service life), Cost Availability Construction and maintenance ease Structural strength, Traffic delays and Water tightness requirements. I. Reinforced Concrete Grade of concrete: C30, Fck (150mm cubes) = 30MPa at 28 days. ---For main part of structures C20, Fck (150mm cubes) = 16MPa at 28 days. ---For footing pad of small height walls C15, Fck (150mm cubes) = 15MPa at 28 days. ---For levelling concrete Other design properties of concrete are used as stated on ERA bridge design Manual -2013 (chapter -7: reinforced concrete) Reinforcement Steel minimum nominal yield strength of deformed bars: AASHTO M31 M Grade 40 (300 MPa Yield strength) AASHTO M31 M Grade 60 (420 MPa Yield strength) II. Stone masonry According to ERA standard technical specification-2013, stone masonry is divided into three classes. However; the consultant has used Class B stone masonry for the construction of major and minor watercourse crossing structures. This grade of stone masonry shall conform to the requirement of ERA standard technical specification – 2013. 9.6 Structure Type Selection The type of drainage structure specified for this project is determined based on economic, topography, hydrologic and hydraulic considerations. Minor drainage structures are used where major drainage structures are not hydraulically required, where debris is tolerable, and where they are more economical than a bridge. The type of drainage structure appropriate to each crossing is recommended. Structures of less than 6m span are designed as minor drainage structures and structures of 6m and above were to be designed as major drainage structures. Engineering Works Consultant PLC. 220 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 To arrive at a safe and economical crossing location, the Consultant has considered the following conditions Straight reach of the river. Location beyond the disturbing influence of large tributaries. Well-defined and stable high banks. Economical and straight approach road. Location that permits square crossing. Less river training works. Good foundation condition. Shortest possible span. Considering the above conditions, the selection task consisted of desktop studies for possible crossing sites. These possibilities are later checked and confirmed on actual field conditions before the final selections were made. Five of the major crossings are designed as a slab bridge and RC deck girder. The substructures of the major crossing are selected to be masonry type to reduce the construction cost and difficulty because the maximum height required is less than 9m, which is the limit for masonry substructure The superstructures at two of the major crossings at 1+120 and 0+378 are RC Deck-Girder type spanning 18m, and 24m simply supported in single span arrangements. The remaining three of the major crossing at 5+280, 0+167 and 0+418 are slab bridge type in single span arrangement. None of the major crossings are skewed and a straight reach was attained. All the crossings were selected at better foundation, narrow locations requiring lesser river training work. 9.7 Structural Evaluation of Existing Structures 9.7.1 Major and Minor Drainage Structures Road segment 1 Musitera-TTC Road In this existing road segment, there is an existing double pipe culvert and two new single span bridges found. The bridges were not under constructed yet. Engineering Works Consultant PLC. 221 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Road segment 2 Kebit Tera Chiro Wereda Asitedader Within this road segment there is an existing 10m triple footbridge or a pedestrian bridge. This footbridge has a 3m carriageway width and the structure is deteriorated which makes it substandard for the new design. Other than these structures, the road has no existing crossing drainage structures. Road segment 3 Sumeya Bridge Addis ketema In this road segment there is an existing skew slab bridge structure and one new single span bridge. The bridge was not under constructed yet. Road segment 4Agape-TTC Road This road segment has no existing cross-drainage structures. Therefore, the design might consider drainage structures. Road segment 5 Agricultural Research Odu- Bulitu University Road This road segment has no existing cross-drainage structures. However, the design might consider drainage structures. Road segment 6 Chiro Ketema Asitedader -Medirilo Kutir 2 Road Engineering Works Consultant PLC. 222 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 This road segment has one single span RC slab culvert with 6m wide carriage width and no sidewalk width on both sides. The superstructure and substructure are not good. Therefore, as per the hydraulics study finding a new slab culvert will be designed. 9.8 Detail Design 9.8.1 Bridges The design process is totally based on the design standard and methodology described on the previous subchapter. During the preliminary design stage different superstructure and substructure types with different arrangements were investigated to arrive at the safest, feasible and economical layout, and in the final stage the best one is detailed with maximum possible accuracy. A lot of geometric revisions were communicated with the highway engineer to make the bridges safer, feasible and economical. And in process the finished grade levels were needed to be raised at some crossings below. There are many structural designs and analysis for the crossings, retaining wall and protection works but among the major components that needed design are: 12m and 24m Reinforced Concrete Deck-Girder Superstructure and 7m Slab Bridge Masonry Abutment, Wing-wall and Pier with their foundations Superstructures are designed with Class-A C-30 concrete reinforced with mild steel and High-Yield steel. All superstructures designed as per the typical drawings having the necessary carriageways, median and walkways and protected by Class-Y reinforced concrete RC railing. 9.8.2 Culverts Minor Drainage structures are concrete box culverts, Slab Culverts and reinforced concrete pipe culverts. Basically standardization of design has to be adopted for minor drainage structures. The standard drawings are prepared based on the standard drawings provided in ERA SDD 2013. Engineering Works Consultant PLC. 223 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Selection between box and slab culverts is made based on the foundation material description provided by the geotechnical engineer at crossing site. According to the sub grade extension reported by the material engineer if the type of the martial where the rectangular culverts lie is weak soils, then Box culverts will be recommended. The selection of end structure for pipe culverts is generally dependent on factors such as the condition of the approaching channel, slope and stability of the outlet channel. The culvert inlet type shall be selected from standard details from the Standard drawing prepared by the consultant based on ERA’s Standard Detail Drawings. Erosion protection will be recommended in consideration to the hydrologist recommendation, invert slope and natural ground inlet and outlet condition of the culvert, those recommendations are presented and quantified on the culvert schedule and culvert crosssection drawing. 9.9 Structures in the Project 9.9.1 Major Structures There are five major crossings in this project which singly supported simple spans superstructures composed RC Deck-Girder. All abutments are proposed to be made of masonry except the height of the abutment exceeds 9m. Table 9- 3: Schedule of Major Structures Road No. 1 2 Name Span No. of Clear Span Height Superstructure 0+378 24m 1 6m RC Deck Girder 5+280 12m 1 4m RC Deck Girder woreda 1+020 18m 2 5.5m RC Deck Girder 0+167 7m 1 5m Slab Bridge 0+418 14m 2 4m RC Deck Girder to Qilisa Muzi tera to TTC to Qilisa Chiro Arrangement Station Muzi tera to TTC Kebet 3 segment tera to Office 4 5 Sumeya Bridge to Addis ketema Hundi gudina school to Nejubas kidane Substructure Masonry Abutment and Wing-wall Masonry Abutment, Wing-wall and Pier Masonry Abutment and Wing-wall Masonry Abutment and Wing-wall Masonry Abutment and Wing-wall mihiret *Span rearranged from hydraulic recommendation for structural standard and construction simplicity Engineering Works Consultant PLC. 224 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. 9.9.2 Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 Minor Structures Along the project route, 66 crossings have been recommended for minor drainage structures by the hydrologist. Of which 54 is Reinforced Concert pipe culverts and the remaining are adopted as either Reinforced Concert Box or Reinforced Slab culverts. Almost all of the existing culverts are replaced mainly due to hydraulic inadequacy because they are mostly silted up. Engineering Works Consultant PLC. 225 Consultancy Services for Topographic Survey, Drainage Facility Study, Detailed Engineering Design, Tender Document Preparation and Economic Evaluation of Chiro Town Internal Asphalt Road Design Project. Oromia Roads and Logistics Bureau Draft Engineering Design Report July 2023 10 UTILITIES AND PRIVATE ACCESSES 10.1 Utilities The type and number of utilities which will be affected by the construction work is presented as shown in table below Table 10- 1: Utilities along the project road Sewerage Water line Street code Street name 1 Muz tera –TTC-Qilisa 2 Kebt tera-Chiro Wereda Office 3 Sumeya Bridge-Addis Ketema 4 5 6 7 Electric line (EL) tension line Electric poles & High Electric poles & High tension line TTC tension line Agri Reserch Center-ODA Bultu Electric poles & High University-Main Asphalt tension line Chiro Town Administration-Mtichu- Electric poles & High Leila tension line Hundi Gudina Scl-Nejebac Kidane Electric poles & High Mihret tension line 9 Blood Bank-Gende Kuteba Bono 10 Chiro Wereda Office – Care Ethiopia Water Line tension line Electric poles & High Hundi Gudina Scl-Aschalew Hotel (WL) Electric poles & High Agape Hotel-Agri Reserch Center- 8 line (SL) Electric poles & High tension line Electric poles & High tension line Electric poles & High tension line 10.2 Private Accesses In the project road, there are no private accesses that are affected by the construction work. Engineering Works Consultant PLC. 226
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )