University of Portland – Shiley School of Engineering
CE 441 – Structural Steel Design
Homework Assignment 01
Initial Due Date 01/23
Final Due Date 01/26
Submit homework assignments in person or on Moodle at the beginning of class (no later
than 9:20 am) on either of the due dates above. Homework assignments must be formatted
according to the formatting guidelines posted on Moodle.
Problem 1.
Problem 2.
University of Portland – Shiley School of Engineering
CE 441 – Structural Steel Design
Problem 3.
Problem 4 (Project). The project building will be a two-story mixed-use building with
commercial real-estate on the ground floor and office real estate on the second floor. What is the
live load (in PSF) for the second floor per ASCE 7-22?