Council Directed
Traffic Calming:
May 6, 2025
Program Overview
Nathan Keltch
Transportation Planner Supervisor
Need for Traffic Calming Program
• Public Works receives frequent requests from Metro Council for
various traffic calming projects.
• Historically budgeting, scoping, drafting done on case by case,
ad-hoc basis.
Small Projects
Mid-Sized Projects
Large projects
projects often funded through
Council Infrastructure Funds (CIF).
Medium-cost projects, historically
no clear pathway to funding
High-cost projects often included
as budget line items
Purpose & Need
• Program’s purpose is to fund medium-cost neighborhood traffic
•
calming projects that have significant community support by
creating a process to capture these project ideas, evaluate, rank,
and fund them.
$500,000 was allocated in the FY25 budget toward this program
Process Overview
Application Complete
Initial Screening Complete
• Each Metro
Council Office
may submit two
Areas of Concern.
Scoring and Ranking
- Complete
• Public Works
screens submittal
to ensure Area of
Concern fits
program criteria.
Design and Budget Ongoing
• Utilize Traffic Calming
Toolbox to design and
create budget
estimate for
improvements for
project area.
• Complete Streets
Coalition & Public
Works scores and
ranks each Area
of Concern.
Council Review –
Current, Ongoing
• Metro Council reviews
preliminary plans,
project rankings,
budget, and approves
projects for funding.
Implementation
• Public Works
implements projects
approved by Metro
Council.
Initial Screening Criteria
Roadway shall be owned by Louisville Metro Government
Traffic Count must be at least 1,000 ADT (Average Daily
Traffic) for Minor Arterials or Collectors and at least 400
ADT for Local Roads
Roadway is not under active construction
Roadway is not identified as part of an already funded
construction project
Roadway should not be included in the paving plan within
the next 3 Fiscal Years
Area of Concern is deemed by Public Works to be within
the scope of this program
Small Projects
Mid-Sized
Projects
Large projects
Projects or
problems that
would require
primarily paint
and/or post and
likely cost less
than $15,000
Problems that
would cost
roughly $20,000
to $150,000 to
adequately
solve the issue.
Projects that
would likely
cost more than
a million dollars
to adequately
address the
issue.
Budgeting
$2,500,000.00
•
$2,000,000.00
•
$1,500,000.00
$1,000,000.00
•
$500,000.00
$To Complete 31 Completed Projects
FY 25 Appropriation
Council will decide how the
$500,000 is allocated. The total
amount to complete all currently
designed projects is $2.176
Million
Which projects could be funded
using the $500,000 will be
discussed in this presentation
31 “shovel ready” projects, that
can be implemented using
separate budget if made
available.
Status Overview
• 46 total submitted
• 31 “Shovel Ready” complete ($2.176 Million)
• 11 Did not pass screening
• 4 passed screening but are not complete
• D21 – Kenwood Drive
• D24 – Miles Lane
• D24 – South Park Road
• D20 – Old Clark Station
Scoring & Ranking
Jeremy Chesler
Transportation Planner II
Area of Concern Scoring
CATEGORY
SAFETY
Scoring
Criteria
TRAFFIC
CRITERIA
Crash History
COMMUNITY
10 points for each Fatal or Suspected Serious Injury crash in the
5 years previous to January 1, of the program year. (2024)
5 points for each Suspected Minor Injury or Possible Injury
crash.
MAX.
POINTS
20
High Injury Network
10 points if roadway is part of the Vision Zero Louisville High
Injury Network.
10
Speed
5 points for each 2 MPH more than 8 MPH over posted speed
limit.
25
Average Daily Traffic: Minor Arterial, 35 points: AADT of 5,000 or greater.
25 points: AADT 3,000 - 4,999.
Primary Collector, Secondary
15 points: AADT 2,999 – 1,000.
Collector
Transit
0 points: AADT less than 1,000.
35 points: AADT of 1,200 or greater.
25 points: AADT 1,199 – 800.
15 points: AADT 799 – 400.
0 points: AADT less than 400.
5 points if on a TARC route.
Bike
5 points if identified in the Bikeway Implementation Plan.
Greenway
5 Points if it has been identified as a future portion of the
Louisville Loop
Pedestrian
5 points if any segment of sidewalk is missing in project area.
Community Facility
5 points for each school, library, park, place of worship,
community center or other significant “people generator ”
within a .5 mile buffer.
Average Daily Traffic: Local
MULTIMODAL
MEASURE
Equity
20 points if project is within a USDOT Justice40 Census Tract.
Complete Streets Coalition Score
The Complete Streets Coalition will assign a score based on
qualitative information and lived experiences.
35
5
5
5
5
20
20
15
Maximum points possible 165
Scoring Insights – Highest Score
Council
District Location
5
W Market St, between S 39th & S 41st
Crash
History
20
High Injury
Network
10
Speed
0
Traffic
Score
35
Transit
5
Bike
5
Greenway
0
Ped.
0
Com.
Facility
20
Equity
20
CSC Score Total
9
124
Scoring Insights – Lowest Score
Council
District Location
19
Long Run Park Rd
Crash
History
0
High Injury
Network
0
Speed
0
Traffic
Score
0
Transit
0
Bike
5
Greenway
0
Ped.
0
Com.
Facility
10
Equity
0
CSC Score Total
9
24
Distribution of Submitted Locations
Planning & Design
Lou Lepping
Transportation Planner II
DOT Site
Recommendations
1. W Market St
2. Barret/Ellison
3. S 5th St
4. Dorsey Ln
5. Bass Rd
6. Mitchell Hill Rd
District 5: W Market St
Traffic Slowing + Crossing Improvements
• New crosswalks
• Rapid Flashing Beacons
• Pedestrian Signage
• Striped Parking
• Concrete Curb Extensions
• Possible Stoplight Removal
District 6/8/15: Barret & Ellison
Crossing Improvements
• New Crosswalks/Bike Crossing
• Rapid Flashing Beacons
• Concrete Medians
• Pedestrian Signage
• New Curb Cuts + Ramps
• Left Turn Lane Removal
• Bike Lane Extended to Corner
District 15/21: S 5th St
Traffic Slowing + Crossing Improvements
• New crosswalks
• Concrete Bumpouts
• Intersection Daylighting
District 18: Dorsey LN Additional Rumble
Strips
• Install additional set of
rumble strips and replace
existing
District 16: Bass Rd
Speed Humps
10 New Speed Humps, as
requested by neighbors
and indicated in the James
Taylor-Jacob School
Neighborhood Plan
District 13: Mitchell Hill Rd
Rumble Strips & Cross Walk
• New Rumble strips
• Upgraded Crosswalk at
Jefferson Memorial
Forest
Budget Overview
Nathan Stone
Project Manager
Considerations for Recommendations
Maintenance
Design
Price
Geography
Impact
Price
24
Budget Overview
Budgeted
All Projects Estimate
$0.5M
$2M
28%
Sliding Scale of Cost
$
$$$
IMPLEMENTATION
(IMMEDIATE TERM COST)
Post & Paint
Speed Humps
$$$
MAINTENANCE
Concrete Work
$
(LONG TERM COST)
25
Implementation Options
Option
Options for Funding
Investment
No. of Projects
A
DOT Recommendation
(top 3-5 for overall impact)
$500,000
3-5
B
Top Scoring projects
(top scores in the criteria matrix)
$500,000
3-5
C
Fund All Projects
(additional appropriation)
$2,170,000
31
26
Implementation Options
A – DOT Recommendation
B – Top Scoring
C – All
(124) W. Market
(124) W. Market
See Packet
(91) Barrett & Ellison
(118) E. Indian Trail
(116) S. 5th St.
(116) S. 5th St.
(77) Dorsey Lane
(110) Breckinridge & Swan
(65) Bass Rd.
(93) Mitchell Hill Rd.
$503,000
$508,000
$2,170,000
27
Lessons Learned
Nathan Keltch
Transportation Planner Supervisor
Lessons Learned
• Not all Council Members Participated; thinking through how
•
•
•
communications should be handled in a more meaningful
way.
Allow more qualitative measures – for example if a persistent
issue has had complaints for years, being able to consider
this in scoring in a more substantial manner.
Set aside funds for engineering services for complex
projects, so that the process is not held up.
Assist Council Members generating ideas that match up with
the initial screening.