ECE 5230
Final Project
Spacecraft Systems Engineering ECE 5230
Final Project 2025
This project involves designing a conceptual spacecraft mission and writing up a 6-to-10page report, excluding some large tables and figures, plus additional appendices all
describing both the design and the rationale for the design choices that were made. The
study can be carried out by either a single student or a team of two. However, if you are
going to work in a team, you need to identify your partner and submit it to me by Monday,
November 24, 2025. Students should use the Excel tools they have been developing for
the homework assignments throughout the semester as a starting point for the project, as
well as any they develop during this project and integrate these spreadsheets as needed for
the design effort. Note that some of the “requirements” below are optional, but can be
completed for extra credit.
Description of the Mission
The goal of this project is to conceptually design a satellite to perform a mission for a
government customer. The description of this mission is presented in the companion
document titled “Mission Requirements Document”.
For this project, the student will use STK to determine the implications of the orbit, such
as contact time with the ground station and spacecraft lighting, on the conceptual design of
the spacecraft. The use of STK constitutes a major component of this final project, and as
such, students will be required to create a scenario of the mission including the
spacecraft(s), ground station(s), and sensor(s) as required. The student must zip up the
directory containing their scenario and turn it in as one of the report elements. Please
consider limiting the file size by either simulating the spacecraft for a single 24-hour period
or not including the ephemeris file in the zip directory. Additionally, a discussion of the
analysis performed in STK and its influence on the mission design will be elements of the
final report.
For the design of this remote sensing spacecraft, the student shall choose commercial off
the shelf components (COTS) where possible, using the provided database of spacecraft
components or from a publicly available web site.
Report Requirements
The project report should
1. Demonstrate a thorough understanding of the mission and its requirements.
2. Describe the proposed technical approaches to comply with each of the
requirements presented in the “Mission Requirements Document”. Exceptions to
the technical requirements in the “Mission Requirements Document” must also be
identified and explained. Some exceptions are to be expected.
3. Be clear and reasonably complete in the technical description of the spacecraft.
4. Present or identify problem areas in the design even if complete solutions cannot
1
ECE 5230
Final Project
be developed within scope of this report.
5. Include descriptions, sketches, drawings, systems analysis, etc. which all should be
presented in sufficient detail to permit an engineering evaluation of the project
report.
6. Provide copies of integrated design models (spread sheet tools) used to develop the
design.
7. Include an STK scenario of the project.
All documents must be typewritten in English, use the International System of units (SI),
and be clearly legible. All cost estimates must be in U.S. dollars. All final reports and
supporting materials must be submitted electronically via Canvas. No page should contain
more than 50 lines of text and the type size should not be smaller than 12 points. Top,
bottom and side margins of one inch should be used. Single or double column format is
acceptable, although single column is preferred. The provided report outline should be
used to structure your report.
The written final report will be evaluated on four criteria described below:
1. Technical Content (30 points)
This concerns the correctness of theory, validity of reasoning used, apparent
understanding and grasp of the subject, etc. Are all major factors considered and a
reasonably accurate evaluation of these factors presented?
2. Organization and Written Presentation (25 points)
The description of the design as an instrument of communication is a strong factor
in the evaluation. Organization of written design, clarity, and inclusion of
pertinent information are major factors.
3. Originality of Work (20 points)
The design final report should avoid just repeating standard information from
sources such as the text book and should show independence of thinking and work.
The effective use of design tools to arrive at independent solutions for the project
shows originality. The creation of figures and diagrams that clearly describe the
design effort also demonstrates the originality of the work.
4. Practical Application and Feasibility (25 points)
The final report should present conclusions or recommendations that are feasible
and practical.
Report Contents
The report should be organized in the following way. This outline can be used a template
for the report if desired and the page estimates are just approximations. Roman numbered
items are suggestions of the types of materials to be presented.
Title Page (~1 page not included in total page count)
Name, Class, Date, Report Title, Picture of Spacecraft if desired
1. Introduction (~0.5-1 page)
a. Brief description of project
b. Highlights of the project report including summaries of key findings or
results of the study that will be presented later in the document.
2
ECE 5230
Final Project
2. Spacecraft Overview (These four required items will not be included in the
page count)
a. Picture or drawing of spacecraft (labeled with key component and their
locations, 1-page)
b. Functional block diagram (1-page)
c. Concept of operations diagram (1-page)
d. Equipment list table which presents the mass and power summary for each
of the spacecraft subsystems (~1 or 2 pages)
3. Subsystem Descriptions (~6-9 pages)
a. Orbit and Mission Design
i. Orbital parameters and orbit overview
ii. Spacecraft lighting and eclipse vs season
iii. Ground stations contact, time to contact summary
iv. STK mission scenario description or overview
b. Propulsion
i. Drag makeup calculations (Excel Spreadsheet or other)
ii. Thrusters, tanks, etc
c. Structures (Optional – Extra Credit awarded)
i. Conceptual material type(s) and where used
ii. Mechanisms/deployable
d. Power
i. Array material and array size (Spread Sheet)
ii. Batteries (Type and Size)
e. Thermal (Optional – Extra Credit awarded)
i. Approach: Passive vs. active locations of radiators etc
ii. Estimated worst case hot and cold temperatures if possible
f. Communications
i. Strategy (Overview, ground station operations, etc.)
ii. Antennas and equipment overview
iii. Telemetry Budget (a short table extracted from the spread sheet)
iv. Link Budget (a short table extracted from the spread sheet)
g. Command and Data Handling (Optional – Extra Credit awarded)
i. Overview of C&DH concept, computer or computer architecture
ii. Data storage approach and amount
h. Attitude Control (Optional – Extra Credit awarded)
i. Strategy Overview
ii. Actuators (i.e., reaction wheels, torque rods, etc.)
iii. Sensors (i.e., sun sensors, horizon sensors, star trackers, etc.)
4. Cost (~1 page)
i. Excel Cost Model presented in a table
5. Conclusions/Results (~0.5-1 page)
i. Major problems and/or proposed solutions
ii. Self-evaluation as to the reasonableness of the
design/strengths/weaknesses
6. References (not included in page count)
i. Only as required, where key information came from
3
ECE 5230
Final Project
7. Appendices (~0.5 page not included in page count)
i. One-line descriptions of attached files STK scenario and relevant
Excel worksheets upload along with this report
Key to outline
• Items in black: required for all submissions
• Items in green: incorporate these, but use the spreadsheets from the Sebestyen
supplementary material provided
• Items in red: optional items for extra credit.
4