See discussions, stats, and author profiles for this publication at: https://www.researchgate.net/publication/309635215 MOBO – An Alternative Type of Subsea Boosting Conference Paper · March 2013 CITATIONS READS 2 6,114 3 authors, including: Juliano Pimentel Aker Solutions 28 PUBLICATIONS 44 CITATIONS SEE PROFILE All content following this page was uploaded by Juliano Pimentel on 02 May 2018. The user has requested enhancement of the downloaded file. MOBO – AN ALTERNATIVE TYPE OF SUBSEA BOOSTING Felipe Ehlke Anastacio Product Engineer | Subsea Controls felipe.anastacio@akersolutions.com Leandro Fischer Product Engineer | Subsea Controls leandro.fischer@akersolutions.com Juliano Pimentel Engineering Manager | Subsea Controls juliano.pimentel@akersolutions.com AkerSolutions™ Francisco Sobania Street, 1300. Curitiba, Brazil Offshore Asia 2013 1 Abstract – The heavy oil reservoirs in South America represents 61 percent of the known technically recoverable heavy oil in the world (40 billion barrels) [1] , with this information we can affirm that the main challenge is not finding resources, but to have the ability to extract this oil in the shortest amount of time to make it commercially viable. Today one of the most promising methods of heavy oil recovery is through subsea pumping system. Subsea pumping systems are used in the UK North Sea, South China, Africa, Equatorial Guinea and in almost every place where there is a heavy oil reservoir. One of the most common types is the Electrical Submersible Pump (ESP) that is used to increase the production flow by depleting the well faster than it would be by regular pressure well flow. One of the issues with ESP is the constant maintenance intervention required due to the low lifetime (3 to 5 years usually). Any intervention generates an operational risk and requires a halt in the production system. In Brazil where are located about 14 billion barrels of proven oil reserves in 2012, with 90 percent consisting in heavy grade oil[2]. A successful case of recovery used in Jubarte and Golfinho field is a pumping module (MOBO) which is installed in a dummy satellite well, that allows topside intervention without stopping the production through a bypass line. This paper will explain the MOBO System regarding its technical advantages as: - Being able to continue production during an intervention on the ESP; - The specifically designed and recently qualified electrical system (5/8.7kV U0/U) which includes a penetrator with a double seal barriers; - A better solution for ESP systems regarding to safety and work over operation; - Low time intervention (3 days average for installation) and a higher level of safety for the operation; This project was initially deployed in eight wells (2 in Golfinho field and 6 in Jubarte field), with a good response from customer, a second phase of the project was developed and we will also present the differences between MOBO Phase I project and MOBO Phase II as to: - Engineering improvements (cost reduction, lessons learned and higher pump power supply demands which required new qualification); - Future drivers of development for this kind of equipment; The main objective of this article is to present an alternative type of equipment for subsea boosting operations which may result in easier, safer and faster intervention in the field. Offshore Asia 2013 2 Keywords — Subsea boosting, MOBO, ESP, heavy oil recovery, subsea equipment; I. INTRODUCTION Heavy oil (API gravity less than 20º) reservoirs are believe to be by the geologists [3] the residue of formerly light oil reservoirs which were degraded by bacteria, evaporation and other natural processes. The revenue generated from the exploration of heavy oil tends to be considerably lower due to higher refining costs, production and transportation; however as the resources of heavy oil represent such a significant amount, it must be considered as an important revenue source by all operators. Provided the heavy oil lower revenue, the operating companies have to find alternative ways to increase profit margins on those fields, as to decrease the operational costs (OPEX). One of the several alternatives is to use “artificial lift” technologies which increases the oil recovery ratio. Following Hubbert’s Peak Theory [4], any geographical oil containing (oil field) has a rate of production tending to be a bell-shaped curve, but how short or wide will this plot be will depend on the technologies used for the oil extraction which can maximize the production flow. Figure 01 – The Hubbert Curve – [5] Offshore Asia 2013 3 The technique that we will address in this paper is the artificial lift using ESP (Electrical Submersible Pump), which is one amongst many artificial lift techniques and has its advantages Advantages and disadvantages as compared on the table below. Rod Pumps Electric Submersible Pump Venturi Hydraulic Pump Gas Lift Progressing Cavity Pump Simple, basic design Extremely high volume lift using up to 1,000kw motors High Volumes Solids tolerant Solids and viscous crude tolerant Unit easily changed Unobtrusive surface location Can use water as power fluid simple to operate Downhole telemetry available Remote power source Can achieve low BHFP Tolerant high well elevation Tolerant high well deviation Can lift high temperature, viscous oils corrosion / scale treatments possible Tolerant high GOR reservoir fluids Pump off control Disadvantages Large volumes in high Energy efficient PI wells Unobtrusive surface location Simple maintenance with downhole motor Tolerant high well deviation Wireline maintenance Friction in crooked Not suitable for low volume wells High surface pressures Lift gas may not be available Elastanes swell in some crude oils Pump wear with solids production (sand, wax, etc) Full workover required to change pump Sensitive to change in surface flowline pressure Not suitable for viscous crude oil or emulsions Pump off control difficult Cable susceptible to Free gas reduces pump damage during efficiency installation with tubing Free gas reduces pump efficiency Cable deteriorates at high temperatures Power oil system hazardous Obtrusive in urban areas Downhole corrosion inhibition difficult Heavy equipment for offshore use Problems with Susceptible to gas rotating rods freezing / hydrates at (windup and after low temperatures spin) increase with depth Casing must withstand lift gas pressure Gas and solids intolerant Increased production casing size often required Figure 02 – Comparison between artificial lift technologies – [6] Usually ESP systems are installed inside the production well and are installed on a pump hanger (a.k.a. tubing hanger) of a Wet Christmas Tree. This paper has the objective of presenting a new type of equipment called MOBO (a term derived from the Portuguese for "boosting module") which uses the ESP technology but it is not installed on the production wellhead, providing more flexibility to work over, more reliability and higher operational uptime. Offshore Asia 2013 4 II. MOBO AS A SUBSEA SYSTEM A. MOBO Overview in a Subsea System For a complete understanding of the MOBO system, it is necessary to understand the different equipment constituting the system and its interaction with other subsea equipment/elements. To provide a better understanding of the overall system, it will be splitted in the main equipment below which are laid subsea: - BAB (Boosting Adaptor Base) - MOBO (Module of Boosting) - ULB (Umbilical Launching Base) - Capsule (divided into sections) - VCM (Vertical Connection Module) - PH (Pump Hanger) - PES (Power Electrical System) Figure 03 – MOBO Complete Stack-Up System and flow diagram [Aker Solutions – Equipment Operation manual] B. VCM (Vertical Connection Module) The VCM is the connection module hence the main function is to connect the flexible lines from topside to subsea equipment. In Brazil, the VCM is used in every equipment that has a production flow, that includes Manifolds, Xmas Trees and MOBOs. It is deployed with the Offshore Asia 2013 5 production flow line terminated from the topside and is installed vertically on a production hub located on the equipment. It has a directional gate valve to control the oil production and a ROV panel which allows the equipment to be mechanically locked into the hub. For the MOBO system, two identical VCMs are used. The first one, suction VCM, is installed on the BAB on the suction line (equipment intake) and connects the MOBO with the Xmas Tree, where the oil flows with the well pressure. The second one, discharge VCM, is installed on the discharge line (equipment outflow) and connects the MOBO to the FPSO in order to collect the oil production after being pumped by the ESP. Figure 04 – VCM Model [Aker Solutions – Equipment Operation manual] C. BAB (Boosting Adaptor Base) As explained before, the MOBO system is not installed on the production wellhead but in a dummy satellite well which will not be deeper than 50 meters (enough length to accommodate the capsule) down into the seabed and can be installed using the Torpedo Base technique.[7] The BAB is the equipment installed on top of the 30” dummy wellhead and has the function of allowing the installation of the VCMs on the hubs. The internal piping allows the outflow of the production from the VCMs, which through a specific valve commanded sequence can be either routed through the MOBO to the ESP or routed to the “bypass line” where the oil will flow straight to the discharge VCM and then to the flow line. Offshore Asia 2013 6 Figure 05 – BAB Model [Aker Solutions – Equipment Operation manual] The bypass line is meant to allow the production to flow if a work over is required in the ESP. The production will then flow with gas injection (GI), from other Xmas Tree. If the bypass valve is closed, the production will flow to the MOBO through the flow line to the capsule where the ESP is installed. Figure 06 – BAB piping detail [Aker Solutions – Equipment Operation manual] Offshore Asia 2013 7 D. MOBO (Module of Boosting) The MOBO equipment has the function of receiving the oil production through the flow line mandrel from the BAB and direct it to the Pump Hanger where the ESP is allocated. The MOBO has two mechanical gate valves to control the production that goes in and out to the Pump Hanger. With those valves, it is possible to lock the fluid inside the capsule where the ESP is allocated and bring the MOBO to the surface for an eventual maintenance without having any oil leak to the environment. The MOBO has two main interfaces: with the flow line mandrel from the BAB and with the Pump Hanger which is the connection to the ESP. It is important to notice that the MOBO has its mechanical connector locked on top of the Pump Hanger at the surface and it is not unlocked by any means subsea, establishing a connection between equipment a ”dry mate” type. Figure 07 – MOBO Model [Aker Solutions – Equipment Operation manual] The production flows to the MOBO from the BAB trough the Flow Line Connector and into the Pump Hanger suction bore, which is located externally from the ESP, filling the capsule and submerging the ESP into production oil. Offshore Asia 2013 8 Figure 08 – MOBO Cut view with flow direction [Aker Solutions – Equipment Operation manual] E. Pump Hanger The Pump Hanger, is where the ESP is hanged/installed inside the capsule on the dummy well. It has three bores that get in contact with the production fluid. The first one is the suction bore, where the oil comes from the MOBO and floods the internal capsule where the ESP is. The second is the discharge bore, where the pressurized oil that went through all the pump stages come back to the MOBO and is exported to the FPSO. The third one is for the electrical connector which is integrated in the ESP motor lead cable. The ESP is torqued into the "saver sub", on the discharge bore, which is a replaceable pipe section with the same threaded interface as on the Pump Hanger. The main function of the saver sub is to avoid the pump hanger full replacement in case of any thread problems while torque is applied to the ESP, so if any damage is made to the threads during the torque process, the saver sub can be easily replaced. Offshore Asia 2013 9 Figure 09 – Pump Hanger Model [Aker Solutions – Equipment Operation manual] The Locking Sleeve at figure 09 is used to rotate clockwise and lock the Pump Hanger on the top of the Capsule where the ESP is accommodated. F. Capsule The capsule is a set of five pipe sections (4 long and 1 short) with diameters of 20” which function is to accommodate the ESP inside the dummy well. During the operation the capsule is flooded with oil so the pump can work in its normal condition. On the top of the capsule is installed the Pump Hanger where the oil flows in, and later on, flows out pressurized by the pump. Offshore Asia 2013 10 Figure 10 – Capsule with Pump Hanger detail [Aker Solutions – Equipment Operation manual] G. ULB (Umbilical Launch Base) The ULB is an individual equipment which interfaces with the MOBO system supplying all the electrical and hydraulic power for the system operation. The ULB is deployed with the umbilical which feeds the MOBO and the Xmas Tree. The umbilical used on the project has the power copper cables, signal and hydraulic lines. Figure 11 – Umbilical Example for a MOBO System [8] Offshore Asia 2013 11 Inside the ULB the power cables are diverted from the main pipeline trough the pipeline spool cut to an UTU (Umbilical Termination Unit) back end. Also, four hydraulic lines (2 for control + 2 for Chemical Injection) are diverted to a stab plate on the panel. All other functions, which are not used on MOBO, are directed to the Xmas Tree as the electrical twisted pairs and other hydraulic functional lines. Figure 12 – Umbilical Launching Base [Aker Solutions - Equipment Operation manual] The connection from the ULB to the MOBO system is made using an electrical power jumper and a 4-way hydraulic jumper which are ROV operated after the deployment of the ULB and the MOBO. The electrical power jumper is deployed with the BAB and the hydraulic jumper is deployed with the ULB. H. PES (Power Electrical System) One of the main achievements of this project was to qualify a 5.0 / 8,7kV (U0/U) - IEC 60502-2 - Category C, medium power system which was fully modular. In other words, it could be replaced without having any termination services as soldering, crimping or curing processes what could generate risks specially offshore, causing downtime. All the integration services (Umbilical to UTU and ESP Cable to Pump Hanger Connector) are made onshore and the resulting products are loaded into the rig for the installation process. All the components of the PES are listed according its numbering below: Offshore Asia 2013 12 Figure 13 – MOBO Power Electrical System [Siemens Tronic - Spectron 8 Power System for MOBO / BAB] Offshore Asia 2013 13 1. UTU - Umbilical Termination Unit As described, the UTU is where the power cables from the umbilical are installed to provide the electrical power needed for the ESP. The umbilical is connected through a pressurized hose to a power receptacle on the panel. 2. Test ROV Plug (with resistors) This ROV plug connector has an Y resistor network connecting its pins. The values of the resistors in this case are 10, 20 and 30 Ω (ohms). It is mated to the UTU receptacle on the panel for electrical testing. When the plug is mated, it is possible to check the umbilical phases and integrity measurement. Figure 14 – Typical Y Resistor network 3. Parking Receptacles These receptacles are used only to assist the ROV maneuvers during the installation of the Infield Power Jumper. 4. Infield Power Jumper This is the only electrical flying lead that connects the ULB to the MOBO system. For this project it has a 25m length since this was the distance between the ULB and MOBO. During the equipment assembly, this jumper is parked and accommodated in a "8" shape at the BAB as it is easier to the ROV to unroll it subsea. 5. Test ROV Plug (isolated phases) This ROV plug connector has no electrical connection between its pins. Its function is to allow insulation testing (5000V@10 min) [9] on the umbilical. 6. Parking Test Receptacle (with resistors) It has the same resistor network as item 2, but the test receptacle allows testing the umbilical with the Infield Jumper connected. That is available to be possible to identify which part of the system the failure occurred, in case of any electrical failures. Offshore Asia 2013 14 7. MOBO Jumper The MOBO Jumper is constituted of a power receptacle on the MOBO panel (7.1), a pressurized hydraulic hose with the electrical cables (7.2), a penetrator (7.3) which is locked in the MOBO main body and a MOBO base plug connector (7.4) which is mated to the Pump Hanger connector. The penetrator has the important function of preventing the water ingress and also the oil escape as it is a secondary barrier from the oil inside the capsule. Between the penetrator and the MOBO interface there is a metal-to-metal seal (7.5) which does not allow the oil to escape. This same seal is used on the pump hanger connector (8.1). The MOBO Jumper is fully modular which means that can be dismounted as one piece equipment from the MOBO and easily replaced. 8. Pump Hanger Connector The Pump Hanger Connector is mounted in one of the 3 bores in the Pump Hanger. It has the function of connecting the MOBO power system to the ESP motor lead. The connector is the first barrier against the oil that is inside the capsule. This connector can be divided into two parts: front end and back end. The back end is where the ESP motor lead is terminated and is individually defined for each project as the supplier of the ESP may be different. Some special tests may be required during qualification as the oil type may change from project to project. For this MOBO project it was required a Rapid Gas Decompression (RGD) [10] test due to the gas build up on the base of the pump hanger during the oil flow in the capsule. Because of this test, the connector termination process includes a special soldering on the cable creating a metal seal inside the connector. This termination is made onshore before the full equipment delivery to the client to be installed. Figure 14 – Pump Hanger Connector [Siemens Tronic - Pump Hanger Receptacle GA] Offshore Asia 2013 15 9. Monitoring Power Jumper The Monitoring Power Jumper is an electrical flying lead with a JIC 6 connection in one end to be connected to any electrical connector available at the rig which will mate with the work over umbilical. The main function is to allow the monitoring of the ESP and of the electrical system during the subsea deployment of the equipment. After the complete installation this jumper is retrieved with the MOBO Installation tool. 10. Parking Test Receptacle (isolated phases) It has no electrical connection between its pins as item nº5. But the test receptacle allows testing the umbilical with the Infield Jumper connected. That is available to be possible to identify on which part of the system has the failure occurred, in case of any electrical low insulation resistance. III. MOBO INSTALLATION & WORK OVER The MOBO system installation can be made in two different scenarios. The first scenario is installing the BAB in advance which gives the opportunity to bring the VCM's installation forward and to start production trough the by pass line without the use of ESP and on a later stage, the MOBO with the capsule and ESP. From the records made by the client, the most efficient MOBO installation took 3 days (72 hours) from the start of the equipment assembly offshore until the start of the rig demobilization. The second scenario is to install the system all together (except the ULB which is launched with the umbilical), which would include BAB, MOBO, Capsule and ESP. During the installation the first step is to move the BAB to the moon pool area. The capsule sections are torqued on each other vertically and allocated inside the BAB. The next step is to torque the ESP sections and connect it to the Pump Hanger which will be locked at the end of the capsule and will seal the ESP inside. After that the MOBO will be locked on top of the Pump Hanger and will make the flow connection between BAB and P.H.. After the MOBO connection, the equipment is ready to be deployed. At the sea bed the equipment will be guided into the dummy wellhead by the capsule tip which makes the alignment between equipment and wellhead much quicker. After the equipment lock at the wellhead, a ROV shall be deployed to connect the hydraulic and electrical jumpers between the MOBO System and the ULB. With the jumpers connected, the system is ready to operate after the ESP topside system is installed in the FPSO. Offshore Asia 2013 16 For any ESP work over, the pump can be retrieved inside the capsule which is hanged on the MOBO, with that there is no need of any interference in the production well where the Christmas tree is installed. That creates a much safer way of intervention as it is not direct into the production well. IV. FUTURE DRIVES Today the MOBO system has two main competitors in which can be considered as future alternatives for the ESP technology. The first competitor is basically a Horizontal Wet Christmas Tree (HWCT) with an ESP straight to the production well. The main advantage is that it exists economic savings when building the field layout as it will have just one equipment (HWCT) for each well instead of two (MOBO and WCT). The main disadvantage is that in every intervention into the well, will cause the production stop due to the necessity of retrieving the ESP and any other system inside the well, which may cause an operational risk. The Horizontal ESP Skid is a new technology which is being proved to be easier to install as it can be installed by boat and there is no need for a rig with drill pipe [11]. The difference that allows this kind of installation is that the ESP is allocated horizontally inside the equipment, which is a huge frame for protection. The horizontal position allows the ESP to be retrieved by cables. Another advantage is that no dummy well is needed as the ESP will not be allocated below the sea bed, which potentially saves cost during the drilling phase. Figure 15 – MOBO System (left)[12] and Horizontal ESP Skid (Right)[11] Offshore Asia 2013 17 V. MOBO PHASE I X MOBO PHASE II The client record shows, a second phase was developed for this type of system. As the equipment engineering was ready, the main focus was in reduce cost, weight, decrease fluid friction loss and to avoid the oil temperature loss. The accomplishments from this effort are listed below. Main differences between equipments: MOBO Phase I MOBO Phase II Design Electrical System 4,7/8kV (Schlumberger Diamould) 5/8.7kV (Siemens Tronic) BAB - Flow line configuration not optimized with high fluid friction loss; - Flow line without elbows which decreased fluid friction loss; - New structure due to the new flow line configuration; MOBO - Aprox. weight: 10 ton; - Flow line configuration not optimized with high fluid friction loss; - Gate valves, lock connector and lifting hub were separated from the main body; - Aprox. weight: 7.8 ton - Flow lines without elbows which decreased fluid friction loss; - New structure due to the new flow line configuration; - Gate valves, lock connector and lifting hub were integrated to the main body; VCM - Aprox. weight: 2.5 ton; - No secondary resident mech. unlock system; - Aprox. weight: 2.15 ton; - Added Swivel; - Added secondary resident mech. unlock system; - Internal pressure 3600 psi; - Length 48m; - Internal pressure 5000 psi; - Length 50.7m; - Added external thermal insulation; - Increased pipe thickness to 2000m; CAPSULE Table 1 – Comparison between MOBO Phase 1 and MOBO Phase 2 Offshore Asia 2013 18 VI. REFERENCES [1] Richard F. Meyer and Emil D. Attanasi - Heavy Oil and Natural Bitumen-Strategic Petroleum Resources. Available at: http://pubs.usgs.gov/fs/fs070-03/fs07003.html [2] Energy Information Administration (EIA) - Brazil Country Analysis Briefs. Available at: http://www.eia.gov/countries/cab.cfm?fips=BR [3] Ian M. Head, D. Martin Jones & Steve R. Later - Biological activity in the deep subsurface and the origin of heavy oil, 2003. [4] Kenneth S. Deffeyes - Hubbert's Peak: The Impeding World Oil Shortage, 2008. [5] Association for the Study of Peak Oil –Hubbert Curve. Available at: ASPOITALIA.NET [6] Heriot-Watt University – Selection of Artificial Lift Types, section 5.5. Available at: http://seipg.files.wordpress.com/2011/04/criterios-de-seleccic3b3n-de-tipos-delevantamiento-artificial.pdf [7] E.F. Nogueira, A.T Borges, C.J.M. Junior and R.D. Machado - Torpedo Base - A New Conductor Installation Process, OTC 17197, 2005. [8] Prysmian - FDT-0607 Umbilical Datasheet. [9] ET-3000.00-1516-823-PEK-007 Rev A - Petrobras technical spec. “Medium Voltage Power Electric System 8kVx220A, Pumping Module (MoBo) with BCSS. [10] Norsok M710 - Qualification of non-metallic sealing materials and manufacturers, rev 2, section 7.3, 2001. [11] Roberto Rodrigues and Alex Dal Pont - O desafio da instalação de Módulos de Bombeamento submarino, preferencialmente sem Sonda, 23º National Offshore and Naval Construction Congress, 2010. [PORTUGUESE REFERENCE] [12] Stuart L. Scott – Artificial Lift, 2008, page 66. VII. CURRICULUM Felipe Ehlke Anastacio has a Bachelors of Science degree in Electrical Engineering from UP (Positivo University – Brazil). Since 2009, he has been working at AkerSolutions as a subsea control systems engineer. Before his current position in the oil and gas industry, he acted in the power turbine design for sugarcane refining for 1 year. Offshore Asia 2013 19 Leandro Fischer has a Bachelors of Science degree in Mechanical Engineering from UFSC (Federal University of Santa Catarina - Brazil). Since 2011, he has been working at AkerSolutions as a subsea control systems engineer. Before his current position in the oil and gas industry, he acted in the machinery industry for 1 year. Juliano Pimentel has a Master of Science in Electronic Engineering from ITA (Technological Institute of Aeronautics – Brazil). He has been in the Subsea Engineering for nearly 10 years, currently working at AkerSolutions and previously for FMC Technologies. Offshore Asia 2013 View publication stats 20
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )