The First Assignment
(Aaharya Technoloiges (OPC) Private Limited, Aspen HYSYS Training Program)
1). Initial condition: We have water at 29 0 C,1 atm Pressure and the flow rate of 100 kgmol/ hour.
Statement:
Increase the pressure up to 4 bars. And find out the power requirements.
what will be the temperature to make that as a vapor. And then use a heater to raise up to that
Then compress it until it converted as liquid and then use a control valve again to make it vapor
2). Take water at 30 degree centigrade, 1 bar pressure. And raise water pressure up to 13 bar..
Calculate the power and heat requirements
What is the efficiency of the pump if the temp crosses 85 degree centigrade.
Add one more pump to increase the flow rate up to 2000 kgmole/hour
Note: max flow rate allowed to the pump is 1000kgmole/hour
Method: Peng Robinson (For both problems)
The information that I provided is right. No problem in it. Try to reach the process conditions.