C FOR APPROVAL 22/08/2025 B FOR APPROVAL 08/07/2025 A FOR APPROVAL 21/06/2025 MODI. REMARK DATE (YYYY.MM.DD) PURCHASER PTC1 END USER POWER TRANSMISSION COMPANY NO. 1 CONTRACTOR VINAKISS MANUFACTURER TCA TECHNOLOGY CO., LTD PROJECT THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY TITLE: COVER SHEET DRAWN SON.BT DATE: SHEET NO.: CHECKER AN.CV STANDARD: IEC 81346 CONT. SHEET: APPR. THANH.NT PTC1/TB-220KV/E06 A00 A01 TOTAL PAGE 33 0 1 2 SHEET No. C B A REV. 3 4 DISCRIPTION 5 REV. 6 SHEET No. 7 8 9 DISCRIPTION REV. =100/A00 COVER SHEET A =100/M5 ES 100-14 CONTROL CIRCUIT A =100/A01 TABLE OF CONTENT A =100/M6 ES 100-15 CONTROL CIRCUIT A =100/A01.a TABLE OF CONTENT A =100/M7 ES 100-24 CONTROL CIRCUIT A =100/B01 CONTROL, PROTECTION & MEASUREMENT PRINCIPLE DIAGRAM A =100/M8 ES 100-94 CONTROL CIRCUIT A =100/B02 TRIP MATRIX A =100/M9 ES 100-95 CONTROL CIRCUIT A =100/B03 OPERATION LOGIC DIAGRAM FOR DS 100-1 A =100/M10 CB CONTROL CIRCUIT A =100/B04 OPERATION LOGIC DIAGRAM FOR DS 100-2 A =100/M11 CB CLOSING CIRCUIT A =100/B05 OPERATION LOGIC DIAGRAM FOR DS 100-3 A =100/N01 CB TRIPPING CIRCUIT NO.1 A =100/B06 OPERATION LOGIC DIAGRAM FOR DS 100-9 A =100/N02 CB TRIPPING CIRCUIT NO.2 A =100/B07 OPERATION LOGIC DIAGRAM FOR ES 100-15, 100-95 A =100/N03 TRIP-LOCKOUT CIRCUIT NO.1 A =100/B08 OPERATION LOGIC DIAGRAM FOR ES 100-94 A =100/N04 TRIP-LOCKOUT CIRCUIT NO.2 A =100/B09 OPERATION LOGIC DIAGRAM FOR ES 100-14 A =100/N05 BINARY INPUTS OF F87BB A =100/B10 OPERATION LOGIC DIAGRAM FOR ES 100-24 A =100/N06 BINARY INPUTS OF F87BB A =100/B11 CLOSING LOGIC DIAGRAM FOR CB 100 A =100/N07 BINARY INPUTS OF F87BB A =100/B12 CLOSING LOGIC DIAGRAM FOR CB 100 A =100/N08 BINARY INPUTS OF F21 A =100/B13 OPENING LOGIC DIAGRAM FOR CB 100 A =100/N09 BINARY INPUTS OF F21 A =100/B14 =100+CRP LAYOUT DRAWING A =100/N10 BINARY INPUTS OF F21 A =100/B15 POWER SUPPLY DIAGRAM FOR CONTROL & PANELS A =100/N11 BINARY INPUTS OF F67 A =100/D01 AC POWER SUPPLY FOR CONTROL AND PROTECTION PANEL A =100/N12 BINARY INPUTS OF F67 A =100/G01 DC POWER SUPPLY FOR CONTROL & PROTECTION PANEL A =100/N13 BINARY INPUTS OF F67 A =100/G02 DC POWER SUPPLY FOR CONTROL & PROTECTION PANEL A =100/Q01 INDICATOR CIRCUIT A =100/G03 DC POWER SUPPLY FOR CONTROL & PROTECTION PANEL A =100/Q02 INDICATOR CIRCUIT A =100/L01 BUS WIRE - BUSBAR VT MCB OFF SIGNAL A =100/Q03 INDICATOR CIRCUIT A =100/L02 BUS WIRE - SELECT SETTING GROUP A =100/R01 BINARY INPUTS OF BCU A =100/L03 BUS WIRE - SELECT RATIO OF CURRENT TRANSFORMER A =100/R02 BINARY INPUTS OF BCU A =100/L05 BUS WIRE - LOAD SHEDDING CIRCUIT (81) A =100/R03 BINARY INPUTS OF BCU A =100/L06 BUS WIRE - TRIPPING CIRCUIT SEND TO TRANSFER BAY A =100/R04 BINARY INPUTS OF BCU A =100/L07 BUS WIRE - SIGNAL SEND TO LINE BAY A =100/R05 BINARY INPUTS OF BCU A =100/L08 BUS WIRE - SIGNAL SEND TO INCOMING BAY A =100/R06 BINARY INPUTS OF BCU A =100/M01 DS 100-1 CONTROL CIRCUIT A =100/R07 BINARY INPUTS OF BCU A =100/M02 DS 100-2 CONTROL CIRCUIT A =100/R08 BINARY INPUTS OF BCU A =100/M3 DS 100-9 CONTROL CIRCUIT A =100/R09 BINARY INPUTS OF BCU A =100/M4 DS 100-3 CONTROL CIRCUIT A =100/R10 BINARY INPUTS OF BCU A FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: CUSTOMER: THANH.NT TABLE OF CONTENT SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE A01 NEXT PAGE A01.a THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME PROJECT: TITLE: SON.BT PTC1 DRAWING NO. PTC1/TB-220KV/E06 0 1 2 SHEET No. C B A REV. 3 4 DISCRIPTION 5 REV. =100/R11 BINARY INPUTS OF BCU A =100/R12 BINARY INPUTS OF BCU A =100/R13 MULTIPLYING SIGNAL CIRCUIT A =100/R14 MULTIPLYING SIGNAL CIRCUIT A =100/R15 LOAD SHEDDING LEVEL SELECTION (81) A =100/R16 LOAD SHEDDING LEVEL SELECTION (81) A =100/R17 SIGNAL FOR LATCHING RELAY KBLT A =100/R18 SIGNAL FOR LATCHING RELAY A =100/R19 SIGNAL CIRCUIT SEND TO OTHER PANELS A =100/S01 CURRENT CIRCUIT FOR PROTECTION RELAYS A =100/S02 CURRENT CIRCUIT FOR PROTECTION RELAYS A =100/S03 CURRENT CIRCUIT FOR PROTECTION RELAYS A =100/S04 CURRENT CIRCUIT FOR PROTECTION RELAYS A =100/S05 BUSBAR VOLTAGE CLASS 3P A =100/S06 BUSBAR VOLTAGE CLASS 3P A =100/S07 BUSBAR C19 VOLTAGE CIRCUIT A =100/T01 CURRENT CIRCUIT FOR MEASUREMENT A =100/T02 BUSBAR VOLTAGE CLASS 0.5 A =100/W01 SPARE CIRCUIT A =100/W04 SPARE TERMINAL A =100/Z01 BAY CONTROL UNIT (BCU) REFERENCE A =100/Z02 BAY CONTROL UNIT (BCU) REFERENCE A =100/Z03 REFERENCE OF DISTANCE PROTECTION RELAY (F21) A =100/Z04 REFERENCE OF DISTANCE PROTECTION RELAY (F21) A =100/Z05 REFERENCE OF DIRECTIONAL OVERCURRENT PROTECTION RELAY (F67) A =100/Z06 REFERENCE OF BUSBAR DIFFERENTIAL PROTECTION RELAY-BAY UNIT (F87BB) A =100/Z07 REFERENCE OF RELAY TESTBLOCK A =100/Z08 TRIPPING CIRCUIT SUPERVISION RELAYS REFERENCE A =100/Z09 REFERENCE OF CONTROLLING DEVICES A =100/Z10 REFERENCE OF CONTROLLING DEVICES A FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: 7 PROJECT: TABLE OF CONTENT SIGNATURE WEBSITE: WWW.TCA-VN.COM 9 REV. BAY = 100 PAGE A01.a NEXT PAGE B01 THAI BINH 220KV SUBSTATION CUSTOMER: THANH.NT 8 DISCRIPTION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME SHEET No. TITLE: SON.BT 6 PTC1 DRAWING NO. PTC1/TB-220KV/E06 0 1 2 3 4 5 6 7 8 9 C11 VOLTAGE CIRCUIT C12 CURRENT CIRCUIT V22 M 100-1 V12 100-24 V21 V11 100-14 M 100-2 KLV2P KLV2M =100+CRP 100-15 KLV1P KLV1M F21 (PCS902S) 100 P1 2000/1 CL: 5P20 800/1 CL: 5P20 CT KLC2 KLC1 F67 IED-EP+/DTIVA) TO #1 TO #1.1 CL: 0.5 800-1200-2000 /1/1/1/1A PM.100(ZMD405) CL: 0.5 BCU (IED-EP+/DVEZ) CL: 5P20 M F87BU (IED-EP+/DTIVA) 100-3 P2 F861 (BJ-8RP) F741 (VDF-10) F862 (BJ-8RP) F742 (VDF-10) 100-95 M 100-9 100-94 C19 LVT 115 0.11 0.11 3 3 3 kV CL: 3P CL: 0.5 C B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: CUSTOMER: THANH.NT CONTROL, PROTECTION & MEASUREMENT PRINCIPLE DIAGRAM SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE B01 NEXT PAGE B02 THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME PROJECT: TITLE: SON.BT PTC1 DRAWING NO. PTC1/TB-220KV/E06 0 1 2 3 4 5 110KV CIRCUIT BREAKER POWER SUPPLY 100 MAIN 2 X IDENT. F21 TYPE PCS-902S =100+CRP X X IED-EP+/ DTIVA F67 F87B IED-EP+/ DTIVA K81 86 86 TRIP F21 F87BB X X X X 21/21N (ZONE 2,3,4) X X X(**) X 67/67N X X X(**) X X3 X4 X3 50/51, 50/51N, SOTF, 79 FINAL TRIP X X X X3 X4 X3 X3 X4 X3 67 X X X(**) X 67N X X X(**) X 50/51, 50/51N, SOTF X X 87B X X X1 X3 X4 X3 F861 BJ-8RP 86 F862 BJ-8RP 86 F741 VDF-10 74 X F742 VDF-10 74 X K81 RF-4R TRIP X X X X +CRP (220kV TRANS.) X +CRP (220kV IN.) X F87T1 87T, 94, 50/51, 50/51N, 87N X F87T2 87T, 94, 50/51, 50/51N X K94 X X F67 X F87BB X F67 67/67N, 50/51, 50/51N, SOTF TRIP X X X X X(*) X1 X1 X1 X2 X2 X2 X2 X X X X X1 X X X X X X X X TCS X TCS 86 PTT DTT X2 X5 X5 X X3 X3 X3 86 TELEPROTECTION X X X3 86 9 X5 X 94 IED-EP+/ DTIVA IED-EP+/ DTIVA IED-EP+/ DTIVA IED-EP+/ DTIVA IED-EP+/ DTIVA F85S 21 (ZONE 1) 50BF 2nd STAGE (100) X TRIP TRIP COIL 2 50BF 1st STAGE (100) START BLOCK START 79 79 50BF(100) 100 TRANSFERRED FOR LINE BAY TRIP COIL 1 50BF 2nd STAGE OTHER 220kV BAYs - BUS 1 50BF 2nd STAGE OTHER 220kV BAYs - BUS 2 BLOCK CLOSING F862 8 100 TRANSFERRED FOR INCOMING BAY F861 F861 F50 BUS 1 BUS 2 (220kV IN.) (200) (22kV) FUNCTION 79/25 X CLOSING COIL F861 7 OTHER 110KV CBs =100+CRP DEVICE PANEL MAIN 1 6 X3 X3 X3 X3 X3 X3 X3 X3 X3 X3 X3 50BF 2nd STAGE (220kV IN.) +CRP (110kV IN.) +CRP (22kV IN.) X X F50 =200+CRP X X F87BB X X F81B1 IED-EP+/ DTIVA 81, 49 X1 X X F81B2 IED-EP+/ DTIVA 81, 49 X2 67/67N, 50/51, 50/51N, SOTF 50BF 2nd STAGE (22kV IN.) X3 50BF 2nd STAGE (200) X4 100 TRANSFERRED FOR LINE BAY +CRP (220kV LINE) =E00+CRP C B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: X F87L X F85S 87L X5 X5 X5 X5 21 (ZONE 1) X5 X5 X5 X5 21/21N (ZONE 2,3,4) X5 X5 X5(**) X5 67/67N X5 X5 X5(**) X5 50/51, 50/51N, DTT, SOTF X5 X5 X5 X5 X DTT SEND PTT 220kV LINE END PROTECTION DTT CUSTOMER: THANH.NT TRIP MATRIX SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE B02 NEXT PAGE B03 THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME PROJECT: TITLE: SON.BT X(*): INTERNALLY START; X(**): FUNCTION ADJUSTED BY THE DISPATCH CENTRE; X1: TRIP IF DS -1 CLOSED; X2: TRIP IF DS -2 CLOSED; X3: TRIP IF (13*-9 & 100-9) CLOSED; X4: TRIP IF (13*-9 & 100-9) & (23*-9 & 200-9) CLOSED; X5: TRIP IF (17*-9 & 100-9) CLOSED; TCS: TRIPPING CIRCUIT SUPERVISORY; PTT: PERMIT TRANSFER TRIP; DTT: DIRECT TRANSFER TRIP PTC1 DRAWING NO. PTC1/TB-220KV/E06 0 1 2 3 SCADA LEVEL 4 5 6 7 CONTROL & PROTECTION PANEL LEVEL 8 9 EQUIPMENT LEVEL CLOSE/OPEN COMMAND FROM DISPATCHING KEY OF BCU ON "LOCAL" POSITION & CLOSE/OPEN COMMAND FROM BCU STATION COMPUTER LEVEL ≥1 KEY OF BCU ON "REMOTE" POSITION & HMI "LOCAL/REMOTE" ON "REMOTE" & ≥1 HMI "LOCAL/REMOTE" ON "LOCAL" BCU & MIMIC CLOSE/OPEN COMMAND FROM HMI & BCU/MIMIC SELECTION SWITCH ON "BCU" POSITION DS LOCAL/REMOTE/MANUAL SWITCH ON "REMOTE" & ≥1 BCU/MIMIC SELECTION SWITCH ON "MIMIC" POSITION C11 & CLOSE/OPEN COMMAND FROM CONTROL SWITCH C12 100-14 100-3 DS LOCAL/REMOTE/MANUAL SWITCH ON "LOCAL" 100-24 M M & 100-1 M ≥1 CLOSE/OPEN COMMAND BY SWITCH AT LOCAL 100-2 CB 100 OPENED 100-15 DS 100-2 OPENED & ES 100-14 OPENED & SOFT INTERLOCKING 100 CT DS LOCAL/REMOTE/MANUAL SWITCH ON "MANUAL" ES 100-15 OPENED & ES 100-95 OPENED CLOSE/OPEN WITH MANUAL OPERATION CB 100 CLOSED DS 100-2 CLOSED & DS 100-3 CLOSED 100-95 100 BLOCKING TRIP CIRCUITS RELAY - OPERATED M CLOSE/OPEN DS 100-1 ≥1 100-9 100-94 C19 BCU FAILURE "ON/OFF" INTERLOCKING SWITCH AT "OFF" C B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: PROJECT: TITLE: SON.BT CUSTOMER: THANH.NT OPERATION LOGIC DIAGRAM FOR DS 100-1 SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE B03 NEXT PAGE B04 THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME & PTC1 DRAWING NO. PTC1/TB-220KV/E06 0 1 2 3 SCADA LEVEL 4 5 6 7 CONTROL & PROTECTION PANEL LEVEL 8 9 EQUIPMENT LEVEL CLOSE/OPEN COMMAND FROM DISPATCHING KEY OF BCU ON "LOCAL" POSITION & CLOSE/OPEN COMMAND FROM BCU STATION COMPUTER LEVEL ≥1 KEY OF BCU ON "REMOTE" POSITION & HMI "LOCAL/REMOTE" ON "REMOTE" & ≥1 HMI "LOCAL/REMOTE" ON "LOCAL" BCU & MIMIC CLOSE/OPEN COMMAND FROM HMI & BCU/MIMIC SELECTION SWITCH ON "BCU" POSITION DS LOCAL/REMOTE/MANUAL SWITCH ON "REMOTE" & ≥1 BCU/MIMIC SELECTION SWITCH ON "MIMIC" POSITION C11 & CLOSE/OPEN COMMAND FROM CONTROL SWITCH C12 100-14 100-3 DS LOCAL/REMOTE/MANUAL SWITCH ON "LOCAL" 100-24 M M & 100-1 M ≥1 CLOSE/OPEN COMMAND BY SWITCH AT LOCAL 100-2 100-15 & CLOSE/OPEN DS 100-2 100 SOFT INTERLOCKING CB 100 OPENED CT DS LOCAL/REMOTE/MANUAL SWITCH ON "MANUAL" & DS 100-1 OPENED CLOSE/OPEN WITH MANUAL OPERATION ES 100-24 OPENED & ES 100-15 OPENED ES 100-95 OPENED 100-95 M ≥1 100-9 100-94 C19 BCU FAILURE "ON/OFF" INTERLOCKING SWITCH AT "OFF" C B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: PROJECT: TITLE: SON.BT CUSTOMER: THANH.NT OPERATION LOGIC DIAGRAM FOR DS 100-2 SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE B04 NEXT PAGE B05 THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME & PTC1 DRAWING NO. PTC1/TB-220KV/E06 0 1 2 3 SCADA LEVEL 4 5 6 7 CONTROL & PROTECTION PANEL LEVEL 8 9 EQUIPMENT LEVEL CLOSE/OPEN COMMAND FROM DISPATCHING KEY OF BCU ON "LOCAL" POSITION & CLOSE/OPEN COMMAND FROM BCU STATION COMPUTER LEVEL ≥1 KEY OF BCU ON "REMOTE" POSITION & HMI "LOCAL/REMOTE" ON "REMOTE" & ≥1 HMI "LOCAL/REMOTE" ON "LOCAL" BCU & MIMIC CLOSE/OPEN COMMAND FROM HMI & BCU/MIMIC SELECTION SWITCH ON "BCU" POSITION DS LOCAL/REMOTE/MANUAL SWITCH ON "REMOTE" & ≥1 BCU/MIMIC SELECTION SWITCH ON "MIMIC" POSITION C11 & CLOSE/OPEN COMMAND FROM CONTROL SWITCH C12 100-14 100-3 DS LOCAL/REMOTE/MANUAL SWITCH ON "LOCAL" 100-24 M M & 100-1 M ≥1 CLOSE/OPEN COMMAND BY SWITCH AT LOCAL 100-2 100-15 & CLOSE/OPEN DS 100-3 CB 100 OPENED 100 SOFT INTERLOCKING DS LOCAL/REMOTE/MANUAL SWITCH ON "MANUAL" CT DS 100-9 OPENED & DS 100-1 OPENED CLOSE/OPEN WITH MANUAL OPERATION & ES 100-14 OPENED ES 100-15 OPENED ES 100-95 OPENED 100-95 M ≥1 100-9 100-94 C19 BCU FAILURE "ON/OFF" INTERLOCKING SWITCH AT "OFF" C B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: PROJECT: TITLE: SON.BT CUSTOMER: THANH.NT OPERATION LOGIC DIAGRAM FOR DS 100-3 SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE B05 NEXT PAGE B06 THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME & PTC1 DRAWING NO. PTC1/TB-220KV/E06 0 1 2 3 SCADA LEVEL 4 5 6 7 CONTROL & PROTECTION PANEL LEVEL 8 9 EQUIPMENT LEVEL CLOSE/OPEN COMMAND FROM DISPATCHING KEY OF BCU ON "LOCAL" POSITION & CLOSE/OPEN COMMAND FROM BCU STATION COMPUTER LEVEL ≥1 KEY OF BCU ON "REMOTE" POSITION & HMI "LOCAL/REMOTE" ON "REMOTE" & ≥1 HMI "LOCAL/REMOTE" ON "LOCAL" BCU & MIMIC CLOSE/OPEN COMMAND FROM HMI & BCU/MIMIC SELECTION SWITCH ON "BCU" POSITION DS LOCAL/REMOTE/MANUAL SWITCH ON "REMOTE" & ≥1 BCU/MIMIC SELECTION SWITCH ON "MIMIC" POSITION C11 & CLOSE/OPEN COMMAND FROM CONTROL SWITCH C12 100-14 100-3 DS LOCAL/REMOTE/MANUAL SWITCH ON "LOCAL" 100-24 M M & 100-1 M ≥1 CLOSE/OPEN COMMAND BY SWITCH AT LOCAL 100-2 100-15 & CLOSE/OPEN DS 100-9 100 SOFT INTERLOCKING CB 100 OPENED CT DS LOCAL/REMOTE/MANUAL SWITCH ON "MANUAL" & DS 100-3 OPENED CLOSE/OPEN WITH MANUAL OPERATION ES 100-94 OPENED & ES 100-15 OPENED ES 100-95 OPENED 100-95 M ≥1 100-9 100-94 C19 BCU FAILURE "ON/OFF" INTERLOCKING SWITCH AT "OFF" C B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: PROJECT: TITLE: SON.BT CUSTOMER: THANH.NT OPERATION LOGIC DIAGRAM FOR DS 100-9 SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE B06 NEXT PAGE B07 THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME & PTC1 DRAWING NO. PTC1/TB-220KV/E06 0 1 2 3 SCADA LEVEL 4 5 6 7 CONTROL & PROTECTION PANEL LEVEL 8 9 EQUIPMENT LEVEL CLOSE/OPEN COMMAND FROM DISPATCHING KEY OF BCU ON "LOCAL" POSITION & CLOSE/OPEN COMMAND FROM BCU STATION COMPUTER LEVEL ≥1 KEY OF BCU ON "REMOTE" POSITION & HMI "LOCAL/REMOTE" ON "REMOTE" & ≥1 HMI "LOCAL/REMOTE" ON "LOCAL" BCU & MIMIC CLOSE/OPEN COMMAND FROM HMI & BCU/MIMIC SELECTION SWITCH ON "BCU" POSITION ES LOCAL/REMOTE/MANUAL SWITCH ON "REMOTE" & ≥1 BCU/MIMIC SELECTION SWITCH ON "MIMIC" POSITION C11 & CLOSE/OPEN COMMAND FROM CONTROL SWITCH C12 100-14 100-3 ES LOCAL/REMOTE/MANUAL SWITCH ON "LOCAL" 100-24 M M & 100-1 M ≥1 CLOSE/OPEN COMMAND BY SWITCH AT LOCAL 100-2 100-15 & CLOSE/OPEN ES 100-15, 100-95 100 SOFT INTERLOCKING ES LOCAL/REMOTE/MANUAL SWITCH ON "MANUAL" CT DS 100-1 OPENED & DS 100-2 OPENED CLOSE/OPEN WITH MANUAL OPERATION & DS 100-9 OPENED DS 100-3 OPENED 100-95 M ≥1 100-9 100-94 C19 BCU FAILURE "ON/OFF" INTERLOCKING SWITCH AT "OFF" C B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: PROJECT: TITLE: SON.BT CUSTOMER: THANH.NT OPERATION LOGIC DIAGRAM FOR ES 100-15, 100-95 SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE B07 NEXT PAGE B08 THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME & PTC1 DRAWING NO. PTC1/TB-220KV/E06 0 1 2 3 SCADA LEVEL 4 5 6 7 CONTROL & PROTECTION PANEL LEVEL 8 9 EQUIPMENT LEVEL CLOSE/OPEN COMMAND FROM DISPATCHING KEY OF BCU ON "LOCAL" POSITION & CLOSE/OPEN COMMAND FROM BCU STATION COMPUTER LEVEL ≥1 KEY OF BCU ON "REMOTE" POSITION & HMI "LOCAL/REMOTE" ON "REMOTE" & ≥1 HMI "LOCAL/REMOTE" ON "LOCAL" BCU & MIMIC CLOSE/OPEN COMMAND FROM HMI & BCU/MIMIC SELECTION SWITCH ON "BCU" POSITION ES LOCAL/REMOTE/MANUAL SWITCH ON "REMOTE" & ≥1 BCU/MIMIC SELECTION SWITCH ON "MIMIC" POSITION C11 & CLOSE/OPEN COMMAND FROM CONTROL SWITCH C12 100-14 100-3 ES LOCAL/REMOTE/MANUAL SWITCH ON "LOCAL" 100-24 M M & 100-1 M ≥1 CLOSE/OPEN COMMAND BY SWITCH AT LOCAL 100-2 100-15 & CLOSE/OPEN ES 100-94 100 SOFT INTERLOCKING ES LOCAL/REMOTE/MANUAL SWITCH ON "MANUAL" CT & DS 100-9 OPENED CLOSE/OPEN WITH MANUAL OPERATION & ALL DS -9 OF OTHER BAYS OPENED 100-95 M ≥1 100-9 100-94 C19 BCU FAILURE "ON/OFF" INTERLOCKING SWITCH AT "OFF" C B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: PROJECT: TITLE: SON.BT CUSTOMER: THANH.NT OPERATION LOGIC DIAGRAM FOR ES 100-94 SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE B08 NEXT PAGE B09 THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME & PTC1 DRAWING NO. PTC1/TB-220KV/E06 0 1 2 3 SCADA LEVEL 4 5 6 7 CONTROL & PROTECTION PANEL LEVEL 8 9 EQUIPMENT LEVEL CLOSE/OPEN COMMAND FROM DISPATCHING KEY OF BCU ON "LOCAL" POSITION & CLOSE/OPEN COMMAND FROM BCU STATION COMPUTER LEVEL ≥1 KEY OF BCU ON "REMOTE" POSITION & HMI "LOCAL/REMOTE" ON "REMOTE" & ≥1 HMI "LOCAL/REMOTE" ON "LOCAL" BCU & MIMIC CLOSE/OPEN COMMAND FROM HMI & BCU/MIMIC SELECTION SWITCH ON "BCU" POSITION ES LOCAL/REMOTE/MANUAL SWITCH ON "REMOTE" & ≥1 BCU/MIMIC SELECTION SWITCH ON "MIMIC" POSITION C11 & CLOSE/OPEN COMMAND FROM CONTROL SWITCH C12 100-14 100-3 ES LOCAL/REMOTE/MANUAL SWITCH ON "LOCAL" 100-24 M M & 100-1 M ≥1 CLOSE/OPEN COMMAND BY SWITCH AT LOCAL 100-2 100-15 & CLOSE/OPEN ES 100-14 100 SOFT INTERLOCKING ES LOCAL/REMOTE/MANUAL SWITCH ON "MANUAL" CT DS 100-1 OPENED & CLOSE/OPEN WITH MANUAL OPERATION DS 100-3 OPENED & ALL DS -1 OF OTHER BAYS OPENED 100-95 M ≥1 100-9 100-94 C19 BCU FAILURE "ON/OFF" INTERLOCKING SWITCH AT "OFF" C B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: PROJECT: TITLE: SON.BT CUSTOMER: THANH.NT OPERATION LOGIC DIAGRAM FOR ES 100-14 SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE B09 NEXT PAGE B10 THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME & PTC1 DRAWING NO. PTC1/TB-220KV/E06 0 1 2 3 SCADA LEVEL 4 5 6 7 CONTROL & PROTECTION PANEL LEVEL 8 9 EQUIPMENT LEVEL CLOSE/OPEN COMMAND FROM DISPATCHING KEY OF BCU ON "LOCAL" POSITION & CLOSE/OPEN COMMAND FROM BCU STATION COMPUTER LEVEL ≥1 KEY OF BCU ON "REMOTE" POSITION & HMI "LOCAL/REMOTE" ON "REMOTE" & ≥1 HMI "LOCAL/REMOTE" ON "LOCAL" BCU & MIMIC CLOSE/OPEN COMMAND FROM HMI & BCU/MIMIC SELECTION SWITCH ON "BCU" POSITION ES LOCAL/REMOTE/MANUAL SWITCH ON "REMOTE" & ≥1 BCU/MIMIC SELECTION SWITCH ON "MIMIC" POSITION C11 & CLOSE/OPEN COMMAND FROM CONTROL SWITCH C12 100-14 100-3 ES LOCAL/REMOTE/MANUAL SWITCH ON "LOCAL" 100-24 M M & 100-1 M ≥1 CLOSE/OPEN COMMAND BY SWITCH AT LOCAL 100-2 100-15 & CLOSE/OPEN ES 100-24 100 SOFT INTERLOCKING ES LOCAL/REMOTE/MANUAL SWITCH ON "MANUAL" CT & DS 100-2 OPENED CLOSE/OPEN WITH MANUAL OPERATION & ALL DS -2 OF OTHER BAYS OPENED 100-95 M ≥1 100-9 100-94 C19 BCU FAILURE "ON/OFF" INTERLOCKING SWITCH AT "OFF" C B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: PROJECT: TITLE: SON.BT CUSTOMER: THANH.NT OPERATION LOGIC DIAGRAM FOR ES 100-24 SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE B10 NEXT PAGE B11 THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME & PTC1 DRAWING NO. PTC1/TB-220KV/E06 0 1 2 3 SCADA LEVEL 4 5 6 7 CONTROL & PROTECTION PANEL LEVEL 8 9 EQUIPMENT LEVEL CLOSE/OPEN COMMAND FROM DISPATCHING STATION COMPUTER LEVEL & HMI "LOCAL/REMOTE" ON "REMOTE" SPRING CHARGED ≥1 HMI "LOCAL/REMOTE" ON "LOCAL" KEY OF BCU ON "REMOTE" POSITION & & ≥1 KEY OF BCU ON "LOCAL" POSITION CLOSING COMMAND FROM HMI SF6 GAS PRESSURE OK & CLOSING COMMAND FROM BCU BCU DS 100-1 OPENED MIMIC DS 100-2 OPENED & BCU/MIMIC SELECTION SWITCH ON "BCU" POSITION DS 100-3 OPENED & DS 100-9 OPENED C11 BCU/MIMIC SELECTION SWITCH ON "MIMIC" POSITION C12 100-14 & ≥1 & CLOSING COMMAND FROM CONTROL SWITCH & CB LOCAL/REMOTE SWITCH ON LOCAL 100-24 CLOSING COMMAND BY SWITCH AT LOCAL 100-3 CLOSE CB 100 M M 100-1 M 100-2 ≥1 SYNCHRO-CHECK IS OK 100-15 "ON/OFF" SYNCHRO-CHECK SWITCH AT "ON" & ≥1 "ON/OFF" SYNCHRO-CHECK SWITCH AT "OFF" 100 CB LOCAL/REMOTE SWITCH ON REMOTE SOFT INTERLOCKING & CT 100-95 M & SOFT INTERLOCKING (*) ≥1 100-9 100-94 BCU FAILURE C19 & "ON/OFF" INTERLOCKING SWITCH AT "OFF" TRIP/LOCKOUT RELAY NOT OPERATED CB TRIPPING CIRCUIT SUPERVISION OK C B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: PROJECT: TITLE: SON.BT CUSTOMER: THANH.NT CLOSING LOGIC DIAGRAM FOR CB 100 SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE B11 NEXT PAGE B12 THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME & PTC1 DRAWING NO. PTC1/TB-220KV/E06 0 1 2 3 4 5 6 7 8 9 CB TRIPPING CIRCUIT SUPERVISION OK TRIP/LOCKOUT RELAY NOT OPERATED DS 100-1 OPENED DS 100-2 OPENED & DS 100-3 OPENED DS 100-9 OPENED DS 100-2 CLOSED LATCHING RELAY KLV2.1 SET LATCHING RELAY KLV2.2 SET & DS 100-3 CLOSED LATCHING RELAY KLV3 SET DS 100-1 CLOSED LATCHING RELAY KLV1.1 SET & LATCHING RELAY KLV1.2 SET ≥1 DS 100-2 CLOSED LATCHING RELAY KLV2.1 SET & LATCHING RELAY KLV2.2 SET 100-14 C11 DS 100-9 CLOSED C12 DS -9 OF OTHER BAYS OPENED & 100-24 DS 100-9 CLOSED 100-3 M M 100-1 M & 100-2 SOFT INTERLOCKING(*) SETTING GROUP OF RELAY F21, F67 OK 100-15 ≥1 DS -9 OF INCOMING BAY CLOSED & LATCHING RELAY KLTT1, KLTT2 OF INCOMING BAY SET 100 LATCHING RELAY KLC2 OF INCOMING BAY SET & LATCHING RELAY KLC1 OF 100 BAY SET ≥1 LATCHING RELAY KLT100 OF 100 BAY SET CT & DS -9 OF LINE BAY CLOSED ≥1 LATCHING RELAY KLC1 OF 100 BAY RESET 100-95 LATCHING RELAY KLC2 OF 100 BAY RESET M 100-9 LATCHING RELAY KLC2 OF 100 BAY SET 100-94 & LATCHING RELAY KLT100 OF 100 BAY SET LATCHING RELAY KLTT OF LINE BAY SET C19 ≥1 & LATCHING RELAY KLC2 OF LINE BAY SET LATCHING RELAY KLV9 OF LINE BAY SET (171/172/173/174/175/176) C B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: CUSTOMER: THANH.NT CLOSING LOGIC DIAGRAM FOR CB 100 SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE B12 NEXT PAGE B13 THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME PROJECT: TITLE: SON.BT PTC1 DRAWING NO. PTC1/TB-220KV/E06 0 1 2 3 SCADA LEVEL 4 5 6 7 CONTROL & PROTECTION PANEL LEVEL 8 9 EQUIPMENT LEVEL CLOSE/OPEN COMMAND FROM DISPATCHING STATION COMPUTER LEVEL SF6 GAS PRESSURE OK & HMI "LOCAL/REMOTE" ON "REMOTE" CB LOCAL/REMOTE SWITCH ON LOCAL ≥1 HMI "LOCAL/REMOTE" ON "LOCAL" KEY OF BCU ON "REMOTE" POSITION & & ≥1 KEY OF BCU ON "LOCAL" POSITION OPENING COMMAND FROM HMI & OPENING COMMAND BY SWITCH AT LOCAL & OPENING COMMAND FROM BCU BCU MIMIC CB LOCAL/REMOTE SWITCH ON REMOTE CLOSING COMMAND FROM CONTROL SWITCH 100-1 M OPEN 100 TRIP COIL 2 BCU/MIMIC SELECTION SWITCH ON "MIMIC" POSITION 100-24 M & ≥1 C12 M ≥1 & C11 100-3 OPEN 100 TRIP COIL 1 & BCU/MIMIC SELECTION SWITCH ON "BCU" POSITION 100-14 & & 100-2 100-15 PROTECTION RELAYS OPERATED 100 CT 100-95 M SF6 GAS PRESSURE OK 100-9 100-94 PROTECTION RELAYS OPERATED C19 C B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: CUSTOMER: THANH.NT OPENING LOGIC DIAGRAM FOR CB 100 SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE B13 NEXT PAGE B14 THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME PROJECT: TITLE: SON.BT PTC1 DRAWING NO. PTC1/TB-220KV/E06 0 1 2 3 4 5 6 7 8 9 DEVICE LIST 2200 C:\Users\ADMIN\Desktop\DOCUMENTS\1. TCA logo nhẹ.bmp CONTROL & PROT.: =100+CRP +84-24.6663.6238 www.tca-vn.com NO. NAMEPLATE DESCRIPTION 1 F21 DISTANCE PROTECTION RELAY 2 F67 DIRECTIONAL OVERCURRENT PROTECTION RELAY 3 F87BB BUSBAR DIFFERENTIAL PROTECTION RELAY (BAY UNIT) 4 BCU BAY CONTROL UNIT 5 SQF01 CONTROL & DISCREPANCY SWITCH FOR CB 6 SQL... CONTROL & DISCREPANCY SWITCH FOR DS 7 SQE... CONTROL & DISCREPANCY SWITCH FOR ES 8 PL01 LAMP INDICATOR FOR CB IN LOCAL CONTROL MODE 9 S.B/M SELECTOR SWITCH "BCU/MIMIC" 10 S.25 SELECTOR SWITCH "ON/OFF" FUNCTION 25 11 S.79 SELECTOR SWITCH "ON/OFF" FUNCTION 79 12 S.49 SELECTOR SWITCH ""OFF/1/2/3" FOR LOAD SHEDDING 13 S.81 SELECTOR SWITCH ""OFF/1/2/3/4" FOR LOAD SHEDDING 14 S.INT SELECTOR SWITCH "ON/OFF" INTERLOCKING 800 15 S.LT SELECTOR SWITCH FOR LAMP TEST BOTTOM VIEW 16 S.RS RESET PUSH BUTTON 17 F741A; F742A,.. TRIP CIRCUIT SUPERVISION RELAY 18 F861, F862 TRIP LOCKOUT RELAY 19 XF... TEST BLOCK 20 QF... MCB FOR POWER SUPPLY ∅38 2100 ∅38 F21 2000 HEALTHY ALARM R L 1900 F2 ENT 900 MENU ESC F1 1800 F3 TARGET RESET F4 1700 1600 F67 ∅29 ∅29 F87BB EURO PROT+ EURO PROT+ COM COM 1500 x I I O O x PROTECTA PROTECTA 1400 BCU 1300 EURO PROT+ COM 1200 I O x PROTECTA 1100 C19 S.QE94 S.RL 1000 S.B/M S.25 S.INT S.LT S.79 S.49 S.81 S.TRIP FRONT DOOR(0-135°) S.QL09 S.QE95 S.QL03 900 S.QF01 PL01 S.QE15 800 S.QL01 700 S.QE14 : EQUIPMENT REUSED OR ASSIGNED IN OTHER PROJECTS S.QL02 S.QE24 C12 600 C11 F861 500 BJ-8RP F862 400 BJ-8RP F741 XF XF XF XF VDF-10 F742 VDF-10 300 QFAC QFDC1QFDC2QFTC1QFTC2 QFTC1QFTC2QF87B QF87L QF87L QF67 QFBCU QFS QFDS CONTROL & RELAY PROTECTION PANEL SPECIFICATION 200 100 NO. DESCRIPTION SPECIFICATION 1 INSTALLATION CONDITION INDOOR 2 PROTECTION RATE IP41 3 STEEL THICKNESS 2.0 mm 4 PAINT COLOR RAL 7032 5 CABLE ENTRY BOTTOM 6 DIMENSION (WxHxD) 800x2200x900 mm 0 800 700 600 500 400 300 200 100 0 REAR DOOR (0-135°) FRONT VIEW WITH DOOR C B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: TOP VIEW CUSTOMER: THANH.NT =100+CRP LAYOUT DRAWING SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE B14 NEXT PAGE B15 THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME PROJECT: TITLE: SON.BT PTC1 DRAWING NO. PTC1/TB-220KV/E06 0 1 2 3 4 5 6 7 8 9 =100+CRP BUS AC BUS DC1 BUS DC2 FQDC1 FQDC2 2P-20A 2P-20A 2P-10A C B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: CUSTOMER: THANH.NT POWER SUPPLY DIAGRAM FOR CONTROL & PANELS SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE B15 NEXT PAGE G03 THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME PROJECT: TITLE: SON.BT CONTROL DS FQS 2P-10A BCU FQDS 2P-10A F87BB FQBCU 2P-10A RELAY F67 FQ87B 2P-10A RELAY F21 FQ67 2P-10A TRIPPING CIRCUIT NO.2 FQ21 2P-10A CLOSING CIRCUIT FQTC2 2P-10A TRIPPING CIRCUIT NO.1 FQTC1 HEATING & LIGHTING FQAC 2P-16A SIGNALING KQS PTC1 DRAWING NO. PTC1/TB-220KV/E06 1 2 3 4 5 6 7 8 9 10 =100+CRP POWER SUPPLY FOR F87BB RELAY / / POWER SUPPLY FOR BCU DC+ -XDC3 1 -XDC3 2 DC- -XDC3 7 -XDC3 8 1 1 4 -XDC3 3 -XDC3 4 -XDC3 5 -XDC3 9 -XDC3 10 -XDC3 11 3 1 -FQBCU 2 POWER SUPPLY FOR DS & ES CONTROL CIRCUIT 6 220 VDC 3 -FQ87B POWER SUPPLY SIGNAL CIRCUIT 3 -FQS 2 4 2 4 1 11 21+ 21- XS 2 12 67+ 67- XS 3 13 87BB+ 87BB- XS 4 14 BCU+ BCU- XS 5 15 SI+ SI- XS 6 16 KS+ KS- XS 7 17 CT-S+ CT-S- -F87BB 2 GND 1 A -BCU 2 GND XS A 8 18 T.PS+ T.PS- XS 9 19 SKL+ SKL- PE C B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: PE 10 DC POWER SUPPLY FOR CONTROL & PROTECTION PANEL THANH.NT SIGNATURE WEBSITE: WWW.TCA-VN.COM 2 4 / / / / / / /R01.1 /R01.1 DS.C+ /M5.1 / / -X3 1 14 15 W100MKD3 1 2 16 / / / =100+MK(OLD) / DS.C+ / DS.C- / /W03d.2 /W03d.2 / / 20 PROJECT: BAY = 100 PAGE G03 NEXT PAGE M5 THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME XS TITLE: SON.BT 3 FQDS XS 1 1 CUSTOMER: PTC1 DRAWING NO. PTC1/TB-220KV/E06 0 1 2 3 4 5 6 7 8 9 =100+CRP INTERLOCKING FOR ES 100-14 DS.C+ DS.C+ NOTE: TẠM THÁO JUMP HÀNG KẸP X3:1 - X3:13 ( ĐẤU TRẢ KHI THI CÔNG NGĂN 100) 25 27 N 11 7 5 -S.B/M CLOSE ES 100-14 BCU 6 -X3 29 -W100MKT4T 1 6 OPEND ES 100-14 5 -BCU -SQE14 3 8 OPEN ES AT MIMIC /M7.1 KBP2 BO3 -W100MKT3T CLOSE ES AT MIMIC 8 5 -BCU MIMIC Push open -X3 BCU Push close G03.10 / OFF INTERLOCK FROM MIMIC 7 L -BO3 -BO4 MIMIC 26 28 -X3 30 8 -X3 31 7 -X3 6 8 32 =100+MK(OLD) NOTE: CHUYỂN ĐẤU LÕI CÁP TỪ TỦ MK176 - XQ2:33 ĐẾN MK100 - X11:23 SANG MK100 - X11:30 -X11 =176+MK B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: 29 =100+QE14 -XQ2 C -X11 30 -M2 33 35 CUSTOMER: THANH.NT ES 100-14 CONTROL CIRCUIT SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE M5 NEXT PAGE M7 THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME PROJECT: TITLE: SON.BT PTC1 DRAWING NO. PTC1/TB-220KV/E06 0 1 2 3 4 5 6 7 8 9 =100+CRP INTERLOCKING FOR ES 100-24 DS.C+ DS.C+ NOTE: TẠM THÁO JUMP HÀNG KẸP X3:1 - X3:13 ( ĐẤU TRẢ KHI THI CÔNG NGĂN 100) 33 35 N 13 9 5 -S.B/M CLOSE ES 100-24 BCU 10 -X3 37 -W100MKT4T 3 6 OPEND ES 100-24 13 -BCU -SQE24 5 9 OPEN ES AT MIMIC /M8.1 KBP2 BO5 -W100MKT3T CLOSE ES AT MIMIC 10 9 -BCU MIMIC Push open -X3 BCU Push close M5.4 / OFF INTERLOCK FROM MIMIC 15 L -BO7 -BO8 MIMIC 34 36 -X3 38 8 -X3 39 7 -X3 14 16 40 =100+MK(OLD) NOTE: CHUYỂN ĐẤU LÕI CÁP TỪ TỦ MK176 - XQ2:43 ĐẾN MK100 - X21:27 SANG MK100 - X21:30 -X21 =176+MK B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: 29 =100+QE24C -XQ2 C -X21 30 -M2 43 35 CUSTOMER: THANH.NT ES 100-24 CONTROL CIRCUIT SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE M7 NEXT PAGE M8 THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME PROJECT: TITLE: SON.BT PTC1 DRAWING NO. PTC1/TB-220KV/E06 0 1 2 3 4 5 6 7 8 9 =100+CRP INTERLOCKING FOR ES 100-94 BCU DS.C+ DS.C+ NOTE: TẠM THÁO JUMP HÀNG KẸP X3:1 - X3:13 ( ĐẤU TRẢ KHI THI CÔNG NGĂN 100) 12 8 14 10 41 -W100MKT4T 4 6 4 1 -BCU -SQE94 3 M -BO1 -BO2 MIMIC 12 -X3 5 -S.B/M KBM KBP2 6 10 OPEND ES 100-94 / 39 N BO6 -W100MKT3T CLOSE ES 100-94 11 11 -BCU OPEN ES AT MIMIC Push open -X3 CLOSE ES AT MIMIC MIMIC Push close M7.4 / OFF INTERLOCK FROM MIMIC 40 -X3 42 8 -X3 43 7 -X3 2 4 44 =100+MK(OLD) NOTE: CHUYỂN ĐẤU LÕI CÁP TỪ TỦ MK176 - XQ2:53 ĐẾN MK100 - X32:23 SANG MK100 - X32:30 -X32 =176+MK B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: 29 =100+QE14 -XQ2 C -X32 30 -M2 33 35 CUSTOMER: THANH.NT ES 100-94 CONTROL CIRCUIT SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE M8 NEXT PAGE R01 THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME PROJECT: TITLE: SON.BT PTC1 DRAWING NO. PTC1/TB-220KV/E06 1 2 3 4 5 6 7 8 9 10 =100+CRP CB 100 CLOSED G03.8 / CB 100 OPENED CB IN LOCAL CONTROL CB SF6 GAS ALARM CB SF6 GAS LOCKOUT CB SPRING UNCHARGED CB 100 AC/DC MCBs OFF EXCESIVE MOTOR RUNNING BCU+ BCU+ X8 1 X8 9 -X8 2 -W100MKS4T 1 =100+MK(OLD) BCU.T+ 20 -X0 20 -X0 21 -X1 10 -M2 29 -X1 19 -M2 30 -X0 22 -X0 19 -XE 22 -XE 21 -W100MKS4T 2 3 X8 10 11 =100+QF01 -XE /R08.1 /R02.1 -NO4 12 13 QFL 1 -BCU 2 14 15 SF6 / 3 4 SP / 5 16 17 7 8 / 6 C BI1 BI2 BI3 BI4 BI5 BI6 BI7 BI8 16 G03.8 / C B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK BCU- BCU- 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: CUSTOMER: THANH.NT BINARY INPUTS OF BCU SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE R01 NEXT PAGE R02 THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME PROJECT: TITLE: SON.BT /R02.1 PTC1 DRAWING NO. PTC1/TB-220KV/E06 1 2 3 4 5 6 7 8 9 10 =100+MK(OLD) DS 100-1 CLOSED DS 100-1 CTRL AT LOCAL DS 100-1 LOSS OF POWER ES 100-14 CLOSED SPARE ES 100-14 OPENED SPARE SPARE SPARE BCU.T+ BCU.T+ =100+QE14 R01.9 / DS 100-1 OPENED =100+CRP -X11 18 -X11 19 -M2 28 -M2 29 -M2 27 -M2 30 -X11 17 -X11 20 -W100MKS4T -X8 -X8 18 Q1C Q1O / 9 -BCU -X8 19 20 -X8 21 -X8 -X8 22 14 23 /R04.1 15 -X8 -X8 24 -X8 25 26 -X8 27 / 10 11 12 13 14 15 1 C 2 3 D BI9 BI10 BI11 BI12 BI13 BI14 BI15 BI1 BI2 BI3 16 R01.10 / C B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK BCU- BCU- 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: CUSTOMER: THANH.NT BINARY INPUTS OF BCU SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE R02 NEXT PAGE R03 THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME PROJECT: TITLE: SON.BT /R05.1 PTC1 DRAWING NO. PTC1/TB-220KV/E06 1 2 3 4 5 6 7 8 9 10 =100+MK(OLD) ES 100-15 CLOSED ES 100-15 OPENED -X8 -X8 SPARE SPARE SPARE =100+CRP 28 4 -BCU B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK -X8 5 30 -X8 6 31 -X8 7 32 8 D BI4 C 29 22/08/2025 08/07/2025 21/06/2025 DATE BI5 DRAWN: CHECKED: APPROVED: BI6 BI7 BI8 CUSTOMER: THANH.NT BINARY INPUTS OF BCU SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE R03 NEXT PAGE R04 THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME PROJECT: TITLE: SON.BT PTC1 DRAWING NO. PTC1/TB-220KV/E06 1 2 3 4 5 6 7 8 9 10 =100+MK(OLD) DS 100-2 CLOSED -M1 24 XN -NO4 -M1 -NO4 -M1 23 23 =100+QL02C 24 =100+QL02B X2 -M1 22 -NO4 /W03d.3 23 X2 23 -W100MKS4T 18 -X8 33 XN -X8 REV. FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: Q2O BINARY INPUTS OF BCU SIGNATURE WEBSITE: WWW.TCA-VN.COM -X8 35 36 -X8 37 / 10 11 BI11 12 13 BI12 BI13 BAY = 100 PAGE R04 NEXT PAGE R05 THAI BINH 220KV SUBSTATION CUSTOMER: THANH.NT NAME -X8 34 / BI10 WIRING DIAGRAMS FOR 100 BAY AN.CV 6 PROJECT: TITLE: SON.BT 21 D BI9 FOR APPROVAL 24 19 9 -BCU /R05.1 5 -KSL2 Q2C A SPARE 24 -M1 24 =100+CRP B DS 100-2 LOSS OF POWER BCU.T+ -M1 C DS 100-2 CTRL AT LOCAL BCU.T+ =100+QL02A R02.9 / DS 100-2 OPENED PTC1 DRAWING NO. PTC1/TB-220KV/E06 1 2 3 4 5 6 7 8 9 10 =100+MK(OLD) ES 100-24 CLOSED BCU.T+ BCU.T+ 22 -X21 23 -M2 32 -M2 33 -NO4 -M2 -NC4 31 -M2 -M2 31 -NO4 -M2 34 -M2 -M2 34 =100+QE24C -X21 =100+QE24B =100+QE24A R04.10 / -NC4 32 -M2 -M2 32 -NO4 SPARE SPARE DS 100-9 CLOSED DS 100-9 OPENED -X8 -X8 DS 100-9 CTRL AT LOCAL DS 100-9 LOSS OF POWER SPARE 33 -NC4 31 -M2 34 -X21 21 -X21 24 -W100MKS5T 2 -X8 38 3 -X8 14 -BCU SPARE /R06.1 -M2 33 =100+CRP ES 100-24 OPENED -X8 39 15 D 40 -X8 1 41 -X8 2 42 3 43 4 -X8 44 5 45 -X8 6 -X8 46 7 47 8 E BI14 BI15 BI1 BI2 BI3 BI4 BI5 BI6 BI7 BI8 16 R02.10 / C B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK BCU- BCU- 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: CUSTOMER: THANH.NT BINARY INPUTS OF BCU SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE R05 NEXT PAGE R06 THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME PROJECT: TITLE: SON.BT /R06.1 PTC1 DRAWING NO. PTC1/TB-220KV/E06 1 2 3 4 5 6 7 8 9 10 =100+MK(OLD) ES 100-94 CLOSED SPARE SPARE ES 100-95 CLOSED SPARE ES 100-95 OPENED SPARE SPARE DS 100-3 CLOSED DS 100-3 OPENED -X4 24 XN -M1 24 SPARE DS 100-3 CTRL AT LOCAL -X32 18 -X32 19 -M1 18 -M1 19 =100+QL03 BCU.T+ =100+QE94 R05.4 / ES 100-94 OPENED 22 -NO4 =100+CRP 17 -M1 20 -X32 17 -X32 20 -W100MKS5T 8 -X8 48 -M1 23 -X4 23 9 -X8 49 XN 12 -X8 50 -X8 51 -X8 -X8 52 53 -X8 -X8 54 55 -X8 56 -X8 57 -X8 9 10 11 12 13 14 15 E 1 2 3 21 8 13 -X8 58 Q3C -BCU 24 -KSL3 /W03d.4 -M1 7 Q3O / 4 -X8 59 60 / 5 6 F BI9 BI10 BI11 BI12 BI13 BI14 BI15 BI1 BI2 BI3 BI4 BI5 BI6 16 R05.10 / C B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK BCU- BCU- 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: CUSTOMER: THANH.NT BINARY INPUTS OF BCU SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE R06 NEXT PAGE R08 THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME PROJECT: TITLE: SON.BT /R08.1 PTC1 DRAWING NO. PTC1/TB-220KV/E06 1 2 3 4 5 6 7 8 9 10 =100+CRP RESET R01.10 / F67 FAILURE F21 FAILURE LOAD SHEDDING 81 LEVEL 1 F87BB FAILURE LOAD SHEDDING 81 LEVEL 3 LOAD SHEDDING 81 LEVEL 4 LATCHING KBLT SET BLOCK TRIP CIRCUIT BCU+ BCU+ X8 / LOAD SHEDDING 81 LEVEL 2 / 4 BCU.KL+ BCU.RS+ / -W100CPS01T 1 =100+ES1106 CONTROL PANEL EXISTING -XBS 1 41 -K704 23 3 S.RS -F67 23 A -F21 LC P1 -F87BB -LC 44 42 3 A 12 8 -KL811 -LC 4 RESET 24 5 1 -BCU 12 8 -KL812 24 2 12 8 -KL813 4 12 8 -KL814 4 8 -KBLT -XBS 81 80 4 2 5 3 4 5 6 7 8 -W100CPS01T 2 -X8 73 9 G BI1 BI2 BI3 BI4 BI5 BI6 BI7 BI8 BI9 16 R06.10 / C B A REV. BCU- BCU- FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: CUSTOMER: THANH.NT BINARY INPUTS OF BCU SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE R08 NEXT PAGE W03a THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR 100 BAY AN.CV NAME PROJECT: TITLE: SON.BT / PTC1 DRAWING NO. PTC1/TB-220KV/E06 1 2 3 4 5 6 7 8 9 10 =100+MK(OLD) -XQ1 30 TB3 115 -X2 125 -X2 126 -XQ2 33 -X11 30 -XC 27 TB3 116 TB3 116 -XQ1 41 -XQ1 51 -XQ1 40 -XQ1 5� TB3 115 TB3 115 TB3 116 TB3 116 -XQ1 41 -XQ1 51 -XQ2 42 -XQ2 52 -X2 125 -X2 125 -X2 126 -X2 126 -XQ2 43 -XQ2 53 -X21 30 -X32 30 =LIÊN ĐỘNG TỪ 100+CRP -XC -XC +ES1106 -XC -M2 35 BC 28 -XC 26 -X12 23 -M1 25 B� -M2 36(-) -M1 26 -X11 24 -X12 24 -M2 35 B� -M2 36(�) -M2 35 B� -M2 36(�) 29 -X21 26 =LIÊN ĐỘNG TỪ E12+MK -X21 27 -X31 23 -M2 35 -M2 35 B� B� +QE032 REMARK 23 =LIÊN ĐỘNG TỪ E12+MK -X21 +QE031 REV. FOR APPROVAL -X11 -XC 27 +QE02C A FOR APPROVAL 28 +QE02B B FOR APPROVAL -X11 =LIÊN ĐỘNG TỪ 100+CRP 26 +QE02A C 29 +QE012 +QE011 13.8 / -X11 28 =LIÊN ĐỘNG TỪ 100+CRP 25 �ON�RO� PANE� -XC =176-9 32 115 =176+MK -XQ2 TB3 =176-2 31 =176+MK -XQ1 =176-1 =176+MK 116 115 =174-9 : DÂY ĐẤU MỚI TB3 TB3 =174-2 : DÂY ĐẤU HIỆN HỮU 5� =175-9 31 -XQ1 =174+MK -XQ1 40 =175+MK 116 =174+MK TB3 -XQ1 =175-2 115 =175+MK TB3 =174-1 =174+MK 25 30 =175-1 =175+MK -XC -XQ1 -X32 29 -X32 28 -X32 23 -M1 25 =LIÊN ĐỘNG TỪ E12+MK B� -M2 36(�) -M2 36(�) -M1 26(�) -X21 28 -X31 24 -X32 24 �1� 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: CUSTOMER: THANH.NT =100+MK CẢI TẠO SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE W03a NEXT PAGE W03b THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR E12 BAY AN.CV NAME PROJECT: TITLE: SON.BT PTC1 DRAWING NO. PTC1/TB-220KV/E12 1 2 3 4 5 6 7 Q3 OPENED Q3 CLOSED Q4 OPENED Q4 CLOSED 8 9 10 =100+MK(OLD) Q0 OPENED Q0 CLOSED Q1 OPENED Q1 CLOSED Q2 OPENED Q2 CLOSED QE02 OPENED QE02 CLOSED QE011 OPENEDQE011 CLOSED QE012 OPENED QE012 CLOSED -X0 3 -X1 12 -X1 4 -X1 26 13 -M1 26 28 -M1 -M1 28 11 27 -KSL3 /W03d.4 14 12 -X3 26 -M1 26 -M1 25 28 -X4 26 -M1 28 -M1 26 -M1 27 -M1 25 28 -X11 4 -M1 28 -M2 14 -M1 27 -M2 13 6 -X12 4 -M2 16 -M2 14 -M2 15 -M2 13 6 -X21 4 -M2 16 -M2 14 -M2 16 -M2 15 -M2 13 -M2 15 -M2 14 -M2 16 25 -M1 27 -M1 26 -M1 28 -M1 25 -M1 27 -M2 13 -M2 15 -M1 26 -M1 28 -M2 14 -M2 16 -M1 25 -M1 27 -M2 13 -M2 15 -X2 25 27 -XS 6 7 6 7 +QE02B -M1 +QL02B +QE02C 1 -XS 1 5 -X1 25 27 -XS 2 3 -XS 4 5 2 3 4 5 B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK 2 XN 4 -X3 25 27 -X4 25 27 -X11 3 5 -X12 3 5 -X21 3 5 -XS 8 9 -XS 10 11 -XS 12 13 -XS 14 15 -XS 16 17 8 9 10 11 12 13 14 15 16 17 (SI+) /Sheet 23 C XN XXX 2 XXX +QL02C CONTROL PANEL +ES1106 -XS -X0 6 +QE02A 25 -M1 3 +QE012 -M1 26 XN +QE011 14 -M1 28 +QL04 -X1 -KSL2 /W03d.3 14 12 26 +QL03 11 -X2 +QL02A 11 1 28 +QL01 +QF00 -X1 XN /21.1 XXX XXX SI+ /Sheet 67 22/08/2025 08/07/2025 21/06/2025 DATE /Sheet 68 DRAWN: CHECKED: APPROVED: CUSTOMER: THANH.NT =100+MK CẢI TẠO SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE W03b NEXT PAGE W03c THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR E12 BAY AN.CV NAME PROJECT: TITLE: SON.BT PTC1 DRAWING NO. PTC1/TB-220KV/E12 1 2 3 4 5 6 7 8 9 10 =100+MK(OLD) QE031 OPENED QE031 CLOSED Q0 LOCAL CONTROL QE032 OPENED QE032 CLOSED Q1 LOCAL CONTROL QL02A LOCAL CONTROL QL02B LOCAL CONTROL QL02C LOCAL CONTROL QL03 LOCAL CONTROL QL04 LOCAL CONTROL SI+ 20.8 / 14 -M2 -X32 4 16 -M1 4 6 -M1 5 -X1 892 -X0 34 -X1 37 12 894 -X1 896 -M1 38 35 -X0 36 -X1 38 -M1 37 12 -M1 38 -M1 37 12 -M1 38 37 -X3 37 -X4 37 -M1 37 -M1 37 -M1 37 12 12 11 -LS4 -LS3 front -M1 38 -M1 38 -M1 38 -X2 38 -X3 38 -X4 38 12 CONTROL PANEL +ES1106 -XS 18 19 -XS 20 21 -XS 22 23 -XS 18 19 -XS 20 21 -XS 22 23 /Sheet 69 B A REV. FOR APPROVAL FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE rear 12 5 X 34S C 11 12 MK DOOR OPENED 3 -M1 -M1 -X2 TÍN HIỆU BỔ SUNG SO �ỚI HIỆN HỮU -X32 5 3 -S2 37 +QL04 3 -M1 15 890 -X1 +QL03 -M2 -X1 +QL01 +QF00 -X31 13 33 6 +QE032 +QE031 -M2 -X0 +QL02C -M2 6 +QL02B 4 +QL02A -X31 35 /Sheet 70 DRAWN: CHECKED: APPROVED: CUSTOMER: THANH.NT =100+MK CẢI TẠO SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE W03c NEXT PAGE W03d THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR E12 BAY AN.CV NAME PROJECT: TITLE: SON.BT PTC1 DRAWING NO. PTC1/TB-220KV/E12 1 2 3 4 5 6 7 8 9 10 =100+MK(OLD) G03.10 / DS.C+ G03.10 / DS.C- XD 1 2 1 3 2 4 -FQDC 2P-6A -X2 -X3 26 26 22 22 24 -KSL2 26 -M1 25 /W03d.3 /W03d.4 21 21 +QL02A -M1 24 -KSL3 26 +QL02B 25 -M1 26 -M1 25 -X2 25 -M1 25 XN 5 XN 6 XN 7 XN 8 +QL02C -M1 26 +QL03 -M1 -M1 -X3 A1 -KSL2 A2 B A REV. FOR APPROVAL FOR APPROVAL REMARK 22/08/2025 08/07/2025 21/06/2025 DATE DRAWN: CHECKED: APPROVED: REL-IR-BL 230VAC 11 /W03b.4 14 12 24 22 34 32 44 42 FOR APPROVAL A1 -KSL3 REL-IR-BL 230VAC C 25 14 12 24 22 34 32 44 42 21 /R04.7 31 41 A2 11 /W03b.5 21 /R06.9 31 41 CUSTOMER: THANH.NT =100+MK CẢI TẠO SIGNATURE WEBSITE: WWW.TCA-VN.COM BAY = 100 PAGE W03d THAI BINH 220KV SUBSTATION WIRING DIAGRAMS FOR E12 BAY AN.CV NAME PROJECT: TITLE: SON.BT NEXT PAGE =175/A00 PTC1 DRAWING NO. PTC1/TB-220KV/E12
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )