Chapter 16 Fundamentals of Variance Analysis Multiple Choice Questions 72. In the general model, a price variance is calculated as A) (AP x AQ) – (AP x SQ) B) (AP x SQ) – (SP x SQ) C) (AP x AQ) – (SP x AQ) D) (AP x AQ) – (SP x SQ) Answer: C Difficulty: Simple Learning Objective: 5 AACSB: Analytic 73. In the general model, an efficiency variance is calculated as A) (SP x AQ) – (SP x SQ) B) (AP x SQ) – (SP x SQ) C) (AP x AQ) – (SP x SQ) D) (AP x AQ) – (SP x AQ) Answer: A Difficulty: Simple Learning Objective: 5 AACSB: Analytic Part B: Computational Questions 88. The Redrock Company uses flexible budgeting for cost control. Redrock produced 10,800 units of product during October, incurring material costs of $13,000. Its master budget for the reflected indirect material costs of $180,000 at a production volume of 144,000 units. What was the flexible budget variance for the indirect material costs in October? A) $1,100 favorable B) $1,100 unfavorable C) $2,000 favorable D) $2,000 unfavorable E) $ 500 favorable Answer: E Difficulty: Moderate Learning Objective: 2 Response: ($180,000/144,000) x 10,800 = $13,500 $13,500 - 13,000 = $500 favorable AACSB: Analytic Use the following to answer questions 89-95: Test Bank, Chapter 16 417 Units Sales revenue Less: <Variable mfg. Costs> <Variable mktg/adm.costs> Contribution margin Actual Results 13,000 ? $87,750 ? $52,000 Flexible Budget Variance 13,000F Flexible Budget ? ? Sales Activity Variance 2000 U ? Master Budget ? ? $3,250U ? $91,000 ? ? ? $4,000F $6,000U $105,000 30,000 ? 89. What is the actual sales revenue? A) $156,000. B) $169,000. C) $180,000. D) $191,000. E) Some other answer _______________. Answer: B Difficulty: Complex Learning Objective: 2 Response: First, solve for actual variable marketing & administrative costs = $29,250 Second, add actual contribution margin to the actual variable costs to find actual sales = $169,000 AACSB: Analytic 90. What is the sales revenue in the flexible budget? A) $139,000. B) $156,000. C) $169,000. D) $180,000. E) Some other answer _______________. Answer: B Difficulty: Complex Learning Objective: 2 Response: $169,000 (actual sales from previous question) - $13,000 = $156,000 AACSB: Analytic 91. What is the flexible budget contribution margin? A) $39,000. B) $45,000. C) $52,000. D) $58,000. E) Some other answer _______________. Answer: A Difficulty: Complex Learning Objective: 2 Response: $156,000 - $91,000 - $26,000 = $39,000 AACSB: Analytic 92. What is the master budget sales revenue? A) $124,000. 418 Lanen, Anderson, Maher Fundamentals of Cost Accounting, 2e B) $148,000. C) $156,000. D) $180,000. E) Some other answer _______________. Answer: D Difficulty: Complex Learning Objective: 2 Response: ($156,000/13,000) = $12 selling price $12 x (13,000 + 2,000) = $180,000 AACSB: Analytic 93. What is the master budget contribution margin? A) $52,000. B) $47,500. C) $45,000. D) $39,000. E) Some other answer _______________. Answer: C Difficulty: Complex Learning Objective: 2 Response: $180,000 - $105,000 - $30,000 = $45,000 AACSB: Analytic 94. What is the activity variance for the variable manufacturing costs? A) $ 4,000 B) $14,000 C) $24,000 D) $34,000 E) Some other answer _______________. Answer: B Difficulty: Simple Learning Objective: 3 Response: $180,000 - $105,000 - $30,000 = $45,000 AACSB: Analytic 95. Refer to the previous question. Is the variance favorable or unfavorable? A) favorable B) unfavorable Answer: A Difficulty: Simple Learning Objective: 3 AACSB: Analytic Use the following to answer questions 96-103: Arrow Industries employs a standard cost system in which direct materials inventory is carried at standard cost. Arrow has established the following standards for the prime costs of one unit of product. Standard Test Bank, Chapter 16 Standard Standard 419 Direct Materials Direct Labor Quantity 8 pounds .25 hour Price $1.80 per pound $8.00 per hour Cost $14.40 2.00 $16.40 During November, Arrow purchased 160,000 pounds of direct materials at a total cost of $304,000. The total factory wages for November were $42,000, 90% of which were for direct labor. Arrow manufactured 19,000 units of product during November using 142,500 pounds of direct materials and 5,000 direct labor hours. 96. What is the direct materials price variance for November? A) $14,250 B) $14,400 C) $16,000 D) $17,100 E) Some other answer _______________. Answer: C Difficulty: Moderate Learning Objective: 5 Response: [(304,000/160,000) - $1.80] x 160,000 = $16,000 unfavorable AACSB: Analytic 97. Is the direct materials price variance favorable or unfavorable? A) favorable B) unfavorable Answer: B Difficulty: Simple Learning Objective: 5 AACSB: Analytic 98. What is the direct materials efficiency (quantity) variance for November? A) $14,250 B) $14,400 C) $16,000 D) $17,100 E) Some other answer _______________. Answer: D Difficulty: Moderate Learning Objective: 2 Response: [(142,500 - (19,000 x 8)] x $1.80 = $17,100 favorable AACSB: Analytic 99. Is the direct materials efficiency (quantity) variance favorable or unfavorable? A) favorable B) unfavorable Answer: A Difficulty: Simple Learning Objective: 5 AACSB: Analytic 420 Lanen, Anderson, Maher Fundamentals of Cost Accounting, 2e 100. What is the direct labor price (rate) variance for November? A) $1,800 B) $1,900 C) $2,000 D) $2,090 E) $2,200 Answer: E Difficulty: Moderate Learning Objective: 2 Response: ($7.56 - $8) x 5,000 = $2,200 favorable AACSB: Analytic 101. Is the direct labor price (rate) variance favorable or unfavorable? A) favorable B) unfavorable Answer: A Difficulty: Simple Learning Objective: 5 AACSB: Analytic 102. What is the direct labor efficiency variance for November? A) $1,800 B) $1,900 C) $2,000 D) $2,090 E) $2,200 Answer: C Difficulty: Moderate Learning Objective: 2 Response: [5,000 - (19,000 x .25)] x $8.000 = $2,000 unfavorable AACSB: Analytic 103. Is the direct labor efficiency variance favorable or unfavorable? A) favorable B) unfavorable Answer: B Difficulty: Moderate Learning Objective: 5 AACSB: Analytic Use the following to answer questions 104-106: The following information summarizes the standard cost for producing one metal tennis racket frame. In addition, the variances for one month's production are given. Assume that all inventory accounts have zero balances at the beginning of the month. Standard Cost Per Unit Test Bank, Chapter 16 Standard Monthly Costs 421 Materials Direct Labor 2 hrs. @ $2.60 Factory Overhead: Variable Fixed $ 4.00 5.20 $ 8,400 10,920 1.80 5.00 $16.00 3,780 10,500 $33,600 Variances: Material price 244.75 unfavorable Material quantity 500.00 unfavorable Labor rate 520.00 favorable Labor efficiency 2,080.00 unfavorable (The change is explained in number 106) 104. What were the actual direct labor hours worked during the month? A) 5,000. B) 4,800. C) 4,200. D) 4,000. E) 3,400. Answer: A Difficulty: Complex Learning Objective: 5 Response: Number of units = $33,600/16.00 = 2,100 [AH - (2,100 x 2)] x $2.60 = $2,080 U; AH = 5,000 AACSB: Analytic 105. What were the actual quantity of materials used during the month? A) 2,156. B) 2,100. C) 2,225. D) 1,975. E) Some other answer _______________. Answer: C Difficulty: Complex Learning Objective: 5 Response: ($4.00 x AQ) - (2,100 x $4.00) = $500 U AQ = 2,225 AACSB: Analytic 106. What was the actual price paid for the direct material during the month? A) $4.34. B) $4.22. C) $4.11. D) $4.00. E) $3.90. 422 Lanen, Anderson, Maher Fundamentals of Cost Accounting, 2e Answer: C Difficulty: Complex Learning Objective: 5 Response: (AP - $4.00) 2,225 = $244.75 U AP = $4.11 (rounded) AACSB: Analytic Use the following to answer questions 107-108: Data on Goodman Company's direct-labor costs are given below: Standard direct-labor hours Actual direct-labor hours Direct-labor efficiency variance-favorable Direct-labor rate variance-favorable Total payroll 30,000 29,000 $ 4,000 $ 5,800 $110,200 107. What was Goodman's actual direct-labor rate? A) $3.60 B) $3.80 C) $4.00 D) $5.80 E) Some other answer _______________. Answer: B Difficulty: Simple Learning Objective: 5 Response: $110,200/29,000 = $3.80 AACSB: Analytic 108. What was Goodman's standard direct-labor rate? A) $3.54 B) $3.80 C) $4.00 D) $5.80 E) Some other answer ______________. Answer: C Difficulty: Simple Learning Objective: 2 Response: (29,000 - 30,000) x SR = 4,000; SR = $4.00 AACSB: Analytic 109. Blue Company produces Trivets. Based on its master budget, the company should produce 1,000 Trivets each month, working 2,500 direct labor hours. During May, only 900 Trivets were produced. The company worked 2,400 direct labor hours. The standard hours allowed for May production would be A) 2,500 hours. B) 2,400 hours. C) 2,250 hours. D) 1,800 hours. Test Bank, Chapter 16 423 E) Some other answer _______________. Answer: C Difficulty: Moderate Learning Objective: 5 Response: 2,500/1,000 = 2.5 hours per unit 2.5 x 900 = 2,250 AACSB: Analytic Use the following to answer questions 110-111: Information on Barber Company's direct labor costs for the month of January 2008 is as follows: Actual direct labor hours Standard direct labor hours Total direct labor payroll Direct labor efficiency variance-favorable 34,500 35,000 $241,500 $ 3,200 110. What is Barber's direct labor price (rate) variance? A) $17,250 B) $20,700 C) $18,750 D) $21,000 E) some other answer _______________. Answer: B Difficulty: Complex Learning Objective: 2 Response: Actual rate = $241,500/34,500) = $7/hr (34,500 - 35,000) x SR = 3,200; SR = $6.40 per hour ($7 - $6.40) * 34,500 = $20,700 unfavorable AACSB: Analytic 111. Is the direct labor price (rate) variance favorable or unfavorable? A) favorable B) unfavorable Answer: B Difficulty: Simple Learning Objective: 5 AACSB: Analytic 112. The following data pertains to the direct materials cost for the month of October: Standard costs Actual costs 5,000 units at $20 each 5,050 units at $19 each What is the direct materials efficiency (quantity) variance? A) $ 950 favorable B) $ 950 unfavorable 424 Lanen, Anderson, Maher Fundamentals of Cost Accounting, 2e C) $1,000 favorable D) $1,000 unfavorable E) $ 50 unfavorable Answer: D Difficulty: Simple Learning Objective: 5 Response: (5,050 - 5,000) x $20 = $1,000 unfavorable AACSB: Analytic 113. The Landry Company has developed standards for labor. During June, 75 units were scheduled and 100 were produced. Data related to labor are: Standard hours allowed Standard wages allowed Actual direct labor 3 hours per unit $4.00 per hour 310 hours (total cost $1,209) What is the labor rate variance for June? A) $30 unfavorable B) $31 favorable C) $31 unfavorable D) $30 favorable E) Some other answer _______________. Answer: B Difficulty: Simple Learning Objective: 2 Response: [($1,209/310) - $4.00] x 310 = $31 favorable AACSB: Analytic 114. Given the following information in standard costing: Standard Actual 16,000 hours at $4.00 15,800 hours at $4.20 What is the total direct labor cost variance? A) $2,630, favorable B) $2,630, unfavorable C) $2,360, favorable D) $2,360, unfavorable E) Some other answer _______________. Answer: E Difficulty: Moderate Learning Objective: 2 Response: (15,800x $4.00) - (15,800 x $4.20) = $3,160 unfavorable AACSB: Analytic Use the following to answer questions 115-121: Dash Company adopted a standard cost system several years ago. The standard costs for the prime costs of its single product are as follows: Material 8 kilograms @ $5.00 per kilogram Test Bank, Chapter 16 $40.00 425 Labor 6 hours @ $8.20 per hour $49.20 The following operating data were taken from the records for November: Units completed Budgeted output Purchases of materials Total actual labor costs Actual hours of labor Material efficiency (quantity) variance Total material variance 5,600 units 6,000 units 50,000 kilograms $300,760 36,500 hours $1,500 unfavorable $ 750 unfavorable 115. What is the direct labor price (rate) variance for November? A) $1,460 B) $4,100 C) $4,120 D) $5,740 E) Some other amount _______________. Answer: A Difficulty: Moderate Learning Objective: 5 Response: ($300,760/36,500 - $8.20) x 36,500 = $1,460 unfavorable AACSB: Analytic 116. Is the direct labor price (rate) variance favorable or unfavorable? A) favorable B) unfavorable Answer: B Difficulty: Simple Learning Objective: 5 AACSB: Analytic 117. What is the direct labor efficiency variance for November? A) $ 4,100 B) $ 5,740 C) $15,580 D) $23,780 E) Some other amount _______________. Answer: D Difficulty: Moderate Learning Objective: 5 Response: [36,500 - (6 x 5,600)] x $8.20 = $23,780 unfavorable AACSB: Analytic 118. Is the direct labor efficiency variance favorable or unfavorable? A) favorable B) unfavorable Answer: B Difficulty: Simple Learning Objective: 5 AACSB: Analytic 426 Lanen, Anderson, Maher Fundamentals of Cost Accounting, 2e 119. What is the actual kilograms of material used in the production process during November? A) 45,100 kg B) 49,900 kg C) 50,000 kg D) 51,500 kg E) Some other amount _______________. Answer: A Difficulty: Moderate Learning Objective: 5 Response: [AQ-used - (8 x 5,600)] x $5.00 = $1,500 unfavorable AQ-used = 45,100 AACSB: Analytic 120. Assume the purchasing department is responsible for the material price variance, what is the actual price paid per kilogram of material during November? A) $4.495 B) $4.985 C) $5.015 D) $5.135 E) Some other amount _______________. Answer: B Difficulty: Moderate Learning Objective: 5 Response: 750 U = $1,500 U + Price variance; Price variance = $750 F (AP - $5.00) x 50,000 = $750 favorable; AP = $4.985 AACSB: Analytic 121. What is the total amount of direct material and direct labor costs transferred to the finished goods account for November? A) $499,520. B) $535,200. C) $550,010. D) $561,040. E) Some other amount _______________. Answer: A Difficulty: Moderate Learning Objective: 7 Response: ($40.00 + $49.20) x 5,600 = $499,520 AACSB: Analytic Test Bank, Chapter 16 427 122. Information for Nighttime Company's direct labor cost for February is as follows: Actual direct labor hours Total direct labor payroll Efficiency variance Rate variance 69,000 $483,000 $ 6,400 F $41,400 U What were the standard direct labor hours for February? A) 70,000 B) 69,000 C) 72,000 D) 71,400 E) Some other amount _______________. Answer: A Difficulty: Complex Learning Objective: 5 Response: (69,000 - SH) x SR = $6,400 favorable [($483,000/69,000) - SR] x 69,000 = $41,400 unfavorable SR = $6.40; SH = 70,000 AACSB: Analytic Use the following to answer questions 123-126: Actual machine hours Standard machine hours allowed Denominator activity (machine hours) Actual fixed overhead costs Budgeted fixed overhead costs Predetermined overhead rate ($1 variable + $4 fixed) 840 900 1,000 $3,800 $4,000 $ 5 123. What is the fixed overhead spending (budget) variance? A) $200 B) $400 C) $300 D) $240 E) Some other answer _______________. Answer: A Difficulty: Simple Learning Objective: 6 Response: $3,800 - $4,000 = $200 favorable AACSB: Analytic 124. Is the fixed overhead spending (budget) variance favorable or unfavorable? A) favorable B) unfavorable Answer: A Difficulty: Simple Learning Objective: 6 AACSB: Analytic 428 Lanen, Anderson, Maher Fundamentals of Cost Accounting, 2e 125. What is the production volume variance? A) $200 B) $400 C) $300 D) $240 E) Some other answer _______________. Answer: B Difficulty: Moderate Learning Objective: 2 Response: $4,000 ($4 x 900) = $400 unfavorable AACSB: Analytic 126. Is the production volume variance favorable or unfavorable? A) favorable B) unfavorable Answer: B Difficulty: Moderate Learning Objective: 5 AACSB: Analytic 127. Dickey Company had total underapplied overhead of $15,000. Additional information is as follows: Variable Overhead: Applied based on standard direct labor hours allowed Budgeted based on standard direct labor hours $42,000 38,000 Fixed Overhead: Applied based on standard direct labor hours allowed Budgeted based on standard direct labor hours $30,000 27,000 What is the actual total overhead for the period? A) $50,000 B) $45,000 C) $80,000 D) $87,000 E) some other answer _______________. Answer: D Difficulty: Moderate Learning Objective: 6 Response: ($30,000 + $42,000) + $15,000 = $87,000 AACSB: Analytic Use the following to answer questions 128-130: Denominator hours for May Actual hours worked during May Standard hours allowed for May Flexible budget fixed overhead cost Actual fixed overhead costs for May Test Bank, Chapter 16 15,000 14,000 12,000 $45,000 $48,000 429 128. What is the fixed overhead spending (budget) variance for May? A) $1,000 unfavorable B) $3,000 unfavorable C) $2,000 unfavorable D) $2,000 favorable E) $3,000 favorable Answer: B Difficulty: Moderate Learning Objective: 2 Response: $48,000 - $45,000 = $3,000 unfavorable AACSB: Analytic 129. What is the production volume variance for May? A) $2,000 B) $3,000 C) $6,000 D) $8,000 E) $9,000 Answer: E Difficulty: Moderate Learning Objective: 2 Response: $45,000 - [($45,000/15,000) x 12,000] = $9,000 unfavorable AACSB: Analytic 130. Is the production volume variance favorable or unfavorable? A) favorable B) unfavorable Answer: B Difficulty: Moderate Learning Objective: 5 AACSB: Analytic Use the following to answer questions 131-138: The Standard Company has developed standard overhead costs based upon a capacity of 180,000 direct labor hours: Standard costs per unit: Variable portion Fixed portion 2 hours @ $3 = $ 6 2 hours @ $5 = $10 $16 During April, 85,000 units were scheduled for production; however, only 80,000 units were actually produced. The following data relate to April: Actual direct labor cost incurred was $644,000 for 165,000 actual hours of work. Actual overhead incurred totaled $1,378,000; $518,000 variable and $860,000 fixed. All inventories are carried at standard cost. 430 Lanen, Anderson, Maher Fundamentals of Cost Accounting, 2e 131. What is the variable overhead spending variance for April? A) $15,000 B) $23,000 C) $38,000 D) $80,000 E) some other answer _______________. Answer: B Difficulty: Moderate Learning Objective: 5 Response: $518,000 - ($3 x 165,000) = $23,000 unfavorable AACSB: Analytic 132. Is the variable overhead spending variance favorable or unfavorable? A) favorable B) unfavorable Answer: B Difficulty: Simple Learning Objective: 5 AACSB: Analytic 133. What is the variable overhead efficiency variance for April? A) $15,000 B) $23,000 C) $38,000 D) $80,000 E) some other answer _______________. Answer: A Difficulty: Moderate Learning Objective: 5 Response: ($3 x 165,000) - ($3 x 2 x 80,000) = $15,000 unfavorable AACSB: Analytic 134. Is the variable overhead spending variance favorable or unfavorable? A) favorable B) unfavorable Answer: B Difficulty: Simple Learning Objective: 5 AACSB: Analytic 135. What is the fixed overhead spending (budget) spending variance for April? A) $ 40,000 B) $ 60,000 C) $100,000 D) $120,000 E) some other answer _______________. Answer: A Difficulty: Moderate Learning Objective: 6 Response: $860,000 - ($5 x 180,000) = $40,000 favorable AACSB: Analytic Test Bank, Chapter 16 431 136. Is the fixed overhead spending (budget) variance favorable or unfavorable? A) favorable B) unfavorable Answer: A Difficulty: Simple Learning Objective: 6 AACSB: Analytic 137. What is the production volume variance for April? A) $ 40,000 B) $ 60,000 C) $100,000 D) $120,000 E) some other answer _______________. Answer: C Difficulty: Moderate Learning Objective: 6 Response: ($3 x 180,000) - ($5 x 2 x 80,000) = $100,000 unfavorable AACSB: Analytic 138. Is the production volume variance favorable or unfavorable? A) favorable B) unfavorable Answer: B Difficulty: Moderate Learning Objective: 6 AACSB: Analytic Use the following to answer questions 139-142: The following information relates to the month of April for The Marilyn Manufacturing Company, which uses a standard cost accounting system. Actual total direct labor Actual direct hours labor used (DLH) Standard hours allowed for good output Direct labor rate variance-unfavorable Actual total overhead Budgeted fixed costs "Normal" activity in hours Total overhead application rate per standard DLH $43,400 14,000 15,000 $ 1,400 $32,000 $ 9,000 12,000 $2.25 Marilyn uses a two-way analysis for its overhead variances. 139. What was Marilyn's controllable variance for April? A) $ 500 B) $1,500 432 Lanen, Anderson, Maher Fundamentals of Cost Accounting, 2e C) $1,750 D) $2,000 E) $2,250 Answer: A Difficulty: Complex Learning Objective: 6 Response: $9,000/12,000 = $.75/DLH for fixed OH rate; Variable OH rate = $1.50/DLH $32,000 - [$9,000 + ($1.50 x 15,000)] = $500 unfavorable AACSB: Analytic 140. Is the controllable variance favorable or unfavorable? A) favorable B) unfavorable Answer: B Difficulty: Simple Learning Objective: 6 AACSB: Analytic 141. What was Marilyn's production volume variance for April? A) $ 500 B) $1,500 C) $1,750 D) $2,000 E) $2,250 Answer: E Difficulty: Moderate Learning Objective: 6 Response: $.75/DLH x (15,000 - 12,000) = $2,250 favorable AACSB: Analytic 142. Is the production volume variance favorable or unfavorable? A) favorable B) unfavorable Answer: A Difficulty: Moderate Learning Objective: 5 AACSB: Analytic Part C: Professional Examination Questions 143. A standard cost system may be used in (CPA adapted) A) job-order costing but not process costing. B) either job-order costing or process costing. C) process costing but not job-order costing. D) neither process costing nor job-order costing. Answer: B Difficulty: Simple Learning Objective: 1 AACSB: Analytic Test Bank, Chapter 16 433 144. When a manager is concerned with monitoring total cost, total revenue, and net profit conditioned upon the level of productivity, an accountant should normally recommend (CPA adapted) A) B) C) D) Flexible Budgeting Yes Yes No No Standard Costing Yes No Yes No Answer: A Difficulty: Simple Learning Objective: 1 AACSB: Analytic 145. In analyzing company operations, the controller of the Jason Corporation found a $250,000 favorable flexible budget revenue variance. The variance was calculated by comparing the actual results with the flexible budget. This variance can be wholly explained by (CMA adapted) A) the total flexible budget variance. B) the total static budget variance. C) changes in unit selling prices. D) changes in the number of units sold. Answer: C Difficulty: Moderate Learning Objective: 2,3 AACSB: Analytic 146. If the total materials variance (actual cost of materials used compared with the standard cost of the standard amount of materials required) for a given operation is favorable, why must this variance be further evaluated as to price and efficiency? (CPA adapted) A) There is no need to further evaluate the total materials variance if it is favorable. B) Generally accepted accounting principles require that all variances be analyzed in three stages. C) All variances must appear in the annual report to equity owners for proper disclosure. D) Determining price and usage variances allows management to evaluate the efficiency of the purchasing and production functions. Answer: D Difficulty: Moderate Learning Objective: 2 AACSB: Analytic 147. The standard unit cost is used in the calculation of which of the following variance? (CPA adapted) A) B) C) D) 434 Materials Price Variance No No Yes Yes Materials Usage Variance No Yes No Yes Lanen, Anderson, Maher Fundamentals of Cost Accounting, 2e Answer: D Difficulty: Simple Learning Objective: 5 AACSB: Analytic 148. A favorable materials price variance coupled with an unfavorable materials usage variance would most likely result from (CMA adapted) A) Machine efficiency problems. B) Product mix production changes. C) Labor efficiency problems. D) The purchase of lower-than-standard-quality materials. Answer: D Difficulty: Moderate Learning Objective: 5 AACSB: Analytic 149. Excess direct labor wages resulting from overtime premium will be disclosed in which type of variance? (CPA adapted) A) Yield B) Quantity C) Labor efficiency. D) Labor rate. Answer: D Difficulty: Moderate Learning Objective: 5 AACSB: Analytic 150. The flexible budget for the month of May was for 9,000 units at a direct materials cost of $15 per unit. Direct labor was budgeted at 45 minutes per unit for a total of $81,000. Actual output for the month was 8,500 units with $127,500 in direct materials and $77,775 in direct labor expense. The direct labor standard of 45 minutes was maintained throughout the month. Variance analysis of the performance for the month of May would show a(n) (CMA adapted) A) Favorable materials efficiency (quantity) variance of $7,500. B) Favorable direct labor efficiency variance of $1,275. C) Unfavorable direct labor efficiency variance of $1,275. D) Unfavorable direct labor price (rate) variance of $1,275. Answer: D Difficulty: Moderate Learning Objective: 5 Response: $81,000/9,000 = $9.00 standard cost per unit $77,775 - ($9 x 8,500) = $1,275 unfavorable direct labor rate variance AACSB: Analytic 151. Tub Company uses a standard cost system. The following information pertains to direct labor for product B for the month of October: Standard hours allowed for actual production Actual rate paid per hour Standard rate per hour Labor efficiency variance Test Bank, Chapter 16 2,000 $8.40 $8.00 $1,600 U 435 What were the actual hours worked for the month of October? A) 1,800 B) 1,810 C) 2,190 D) 2,200 E) some other answer _______________. Answer: D Difficulty: Moderate Learning Objective: 5 Response: (AH - 2,000) x $8.00 = $1,600 unfavorable; AH = 2,200 AACSB: Analytic 152. The fixed factory overhead application rate is a function of a predetermined activity level. If standard hours allowed for good output equal this predetermined activity level for a given period, the volume variance will be (CPA adapted) A) Zero. B) Favorable. C) Unfavorable. D) Either favorable or unfavorable, depending on the budgeted overhead. Answer: A Difficulty: Moderate Learning Objective: 6 AACSB: Analytic 153. Which one of the following variances is of least significance from a behavioral control perspective? (CMA adapted) A) Unfavorable materials quantity variance amounting to 20% of the quantity allowed for the output attained. B) Unfavorable labor efficiency variance amounting to 10% more than the budgeted hours for the output attained. C) Favorable materials price variance obtained by purchasing raw materials from a new vendor. D) Fixed factory overhead volume variance resulting from management's decision midway through the fiscal year to reduce its budgeted output by 20%. Answer: D Difficulty: Moderate Learning Objective: 6 AACSB: Analytic Essay Questions 154. The Hageness Company has had great difficulty in controlling overhead costs. At a recent convention, the president heard about a control device for overhead costs known as a flexible budget and she has hired you to implement this budgeting program. After some effort, you develop the following cost formulas for the company's machining department. These costs are based on a normal operating range of 15,000 to 23,000 machine-hours per month: Machine setup Lubricants 436 $0.20 per machine-hour $1.00 per machine-hour plus $8,000 per month Lanen, Anderson, Maher Fundamentals of Cost Accounting, 2e Utilities Indirect labor Depreciation $0.70 per machine-hour $0.60 per machine-hour plus $20,000 per month $32,000 per month During March 2007, the first month after your preparation of the above data, the machining department worked 18,000 machine-hours and produced 9,000 units of product. The actual costs of this production were: Machine set-up Lubricants Utilities Indirect labor Depreciation $ 4,800 24,500 12,000 32,500 32,500 $106,300 The department had originally been budgeted to work 19,000 machine-hours during March 2007. Required: Prepare a performance report for the machining department for the month of March including columns for the (a) actual results, (b) flexible budget, (c) flexible budget variance, (d) master budget, and (e) sales activity variance. Answer: Machine Setup Lubricants Utilities Indirect Labor Depreciation Total Costs Actual 4,800 24,500 12,000 32,500 32,500 106,300 Flexible Budget 3,600 26,000 12,600 30,800 32,000 105,000 Flex. Budget Variance 1,200 U 1,500 F 600 F 1,700 U 500 U 1,300 U Master Budget 3,800 27,000 13,300 31,400 32,000 107,500 Sales Activity Variance 200 F 1,000 F 700 F 600 F 0F 2,500 F AACSB: Analytic 155. The Kessler Company has the following information pertaining to the month of March: Units of output, actual Fixed costs, actual Operating profit, master budget Sales price variance Beginning and ending inventories Sales volume variance, revenue Budgeted selling price per unit Variable costs, master budget Contribution margin, actual 21,000 $ 497,000 $ 220,000 $ 84,000 U -0$ 300,000 U $ 100 $1,680,000 $ 516,000 Required: Test Bank, Chapter 16 437 Prepare a performance report for March including columns for the (a) actual results, (b) flexible budget, (c) flexible budget variance, (d) master budget, and (e) sales activity variance. Answer: Units Sales Variable Costs Contribution Margin Fixed Costs Operating Profits Actual 21,000 2,016,000 1,500,000 Flexible Budget 21,000 2,100,000 1,470,000 Flex. Budget Variance 0 84,000 U 30,000 U Master Budget 24,000 2,400,000 1,680,000 Sales Activity Variance 3,000 U 300,000 U 210,000 F 516,000 497,000 630,000 500,000 114,000 U 3,000 F 720,000 500,000 90,000 U 0F 19,000 130,000 111,000 U 220,000 90,000 U AACSB: Analytic 156. Eastern Company manufactures special electrical equipment and parts. Eastern employs a standard cost accounting system with separate standards established for each product. A special transformer is manufactured in the Transformer Department. Production volume is measured by direct labor hours in this department and a flexible budget system is used to plan and control department overhead. Standard costs for the special transformer are determined annually in September for the coming year. The standard cost of a transformer for 2007 was computed at $67.00 as shown below. Direct materials: Iron Copper Direct labor Variable overhead Fixed overhead TOTAL 5 sheets 3 spools 4 hours 4 hours 4 hours @$2.00 @$3.00 @$7.00 @$3.00 @$2.00 $10.00 9.00 28.00 12.00 8.00 $67.00 Overhead rates were based upon normal and expected monthly capacity for 2007, both of which were 4,000 direct labor hours. Practical capacity for this department is 5,000 direct labor hours per month. Variable overhead costs are expected to vary with the number of direct labor hours actually used. During October, 2007, 800 transformers were produced. This was below expectations because a work stoppage occurred during contract negotiations with the labor force. Once the contract was settled, the department scheduled overtime in an attempt to catch up to expected production levels. The following costs were incurred in October 2007: 438 Lanen, Anderson, Maher Fundamentals of Cost Accounting, 2e DIRECT MATERIALS: Iron Copper Purchased 5,000 sheets @ $2.00/sheet 2,200 spools @ $3.10/spool Used 3,900 sheets 2,600 spools DIRECT LABOR: Regular time: 2,000 hours @ $7.00 Overtime: 1,400 hours $ $7.20 600 of the 1,400 hours were subject to overtime premium. The total overtime premium of $2,160 is included in variable overhead in accordance with company accounting practices OVERHEAD: Variable overhead Fixed overhead $10,000 $ 8,800 Required: Compute each of the following variances, showing all your work. Be sure to indicate whether the variances are favorable or unfavorable. (A) Direct materials price variance for both iron and copper (B) Direct material efficiency (quantity) variance for both iron and copper (C) Direct labor rate variance (D) Direct labor efficiency variance (E) Variable overhead spending variance (F) Variable overhead efficiency variance (G) Fixed overhead spending (budget) variance (H) Production volume variance Answer: (A) Iron: ($2.00 - $2.00) x 5,000 = $0 favorable Copper : ($3.10 - $3.00) x 2,200 = $220 unfavorable (B) Iron: [3,900 – (5 x 800)] x $2.00 = $200 favorable Copper: [2,600 – (3 x 800)] x $3.00 = $600 unfavorable (C) [($7.00 x 2,000) + ($7.20 x 1,400)] – ($7.00 x 3,400) = $280 unfavorable (D) [3,400 – (4 x 800)] x $7.00 = $1,400 unfavorable (E) $10,000 – ($3.00 x 3,400) = $200 favorable (F) ($3.00 x 3,400) – [$3.00 x (4 x 800)] = $600 unfavorable (G) $8,800 – ($2.00 x 4,000) = $800 unfavorable (H) ($2.00 x 4,000) – ($2.00 x 3,200) = $1,600 unfavorable AACSB: Analytic 157. The XYZ Company uses a standard cost accounting system and estimates production for 2007 to be 60,000 units. At this volume, the company's variable overhead costs are $.50 per direct labor hour. The company's single product has a standard cost of $30.00 per unit. Included in the $30.00 is Test Bank, Chapter 16 439 $13.20 for direct materials (3 yards) and $12.00 of direct labor (2 hours). Production information for the month of March 2007 follows: Number of units produced Materials purchased (24,000 yards) Materials used in production (yards) Variable overhead costs incurred Fixed overhead costs incurred Direct labor cost incurred ($6.50/hour) 6,000 $115,200 18,500 $6,380 $20,400 $75,400 Required: (Be sure to indicate whether the variances are favorable or unfavorable.) (A) Compute the direct material price variance, assuming the material price variance is the responsibility of the company's purchasing agent. (B) Compute the direct material efficiency variance. (C) Prepare the journal entry to record the issuance of materials to production assuming all material variances are recognized when materials are used. (D) Compute the direct labor price (rate) variance. (E) Compute the direct labor efficiency variance. (F) Compute the predetermined overhead rate used for the year. (G) Compute the budgeted fixed costs for the month. (H) Compute the variable overhead spending variance. (I) Compute the variable overhead efficiency variance. (J) Compute the fixed overhead spending (budget) variance. (K) Compute the production volume variance. Answer: (A) [($115,200/24,000) – ($13.20/3)] x 24,000 = ($4.80 - $4.40) x 24,000 = $9,600 unfavorable (B) [18,500 – (3 x 6,000)] x $4.40 = $2,200 unfavorable (C) Work-in-process inventory (18,000 x $4.40) Dr. 79,200 Price variance ($.40 x 18,500) Dr. 7,400 Quantity variance (500 x $4.40) Dr. 2,200 Direct materials inventory (18,500 x $4.80) Cr. 88,800 (D) ($6.50 - $6.00) x ($75,400/$6.50) = $5,800 unfavorable (E) [11,600 – (2 x 6,000)] x $6.00 = $2,400 favorable (F) $30.00 - $13.20 - $12.00 = $4.80/unit or $2.40 per DLH (G) $4.80 x 60,000 = $288,000 Total OH $.50 x (2 x 60,000) = $60,000 Variable OH Budgeted fixed OH = $288,000 - $60,000 = $228,000 (H) $6,380 – ($.50 x 11,600) = $580 unfavorable (I) ($.50 x 11,600) – [$.50 x (2 x 6,000)] = $200 favorable (J) $20,400 – ($228,000/12) = $1,400 unfavorable (K) ($228,000/12) – [($228,000/120,000) x (2 x 6,000)] = $3,800 favorable AACSB: Analytic 158. The condensed flexible budget of the Scott Company for 2007 is given below: Overhead Costs: Variable costs 440 Direct labor-hours 30,000 40,000 50,000 $75,000 ? ? Lanen, Anderson, Maher Fundamentals of Cost Accounting, 2e Fixed costs ? ? $320,000 The company produces a single product that requires 2.5 direct labor-hours to complete. The direct labor wage rate is $7.50 per hour. Three yards of raw material are required for each unit of product, at a cost of $5 per yard. Assume that the company chooses 50,000 direct labor-hours as the denominator level of activity, but actually worked 48,000 hours in 2007 producing 18,500 units. Actual overhead costs for the year are: Variable costs Fixed costs Total overhead costs $ 124,800 321,700 $ 446,500 Required: (Be sure to indicate whether the variances are favorable or unfavorable.) A) Compute the variable overhead spending variance and the variable overhead efficiency variance. B) Compute the fixed overhead spending (budget) variance and the production volume variance. Answer: Variable OH rate = $75,000/30,000 = $2.50 per DLH Fixed OH rate = $320,000/50,000 = $6.40 per DLH (A) $124,800 – ($2.50 x 48,000) = $4,800 unfavorable ($2.50 x 48,000) – ($2.50 x 18,500 x 2.5) = $4,375 unfavorable (B) $321,700 - $320,000 = $1,700 unfavorable $320,000 – ($6.40 x 18,500 x 2.5) = $24,000 unfavorable AACSB: Analytic Test Bank, Chapter 16 441
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )