Faculty of Engineering and Applied Science ENGI 9121: Advanced Safety and Risk Engineering ALEXANDER L. KIELLAND (A CASE STUDY OF ASSET INTEGRITY ASSESSMENT AND MANAGEMENT ON THE CAPSIZE OF A SEMI-SUBMERSIBLE FLOTEL) Dr. Sajid, Zaman Group Members 1. Bernard Asamoah-Akrasi 2. Solomon Boateng 3. Amjad Almoqayed 4. Mohammad Alauddin 201890168 201995465 201894584 201990560 TABLE OF CONTENT 1 1.0 Abstract 3 1.1 Introduction/ Background: Alexander L. Kielland Flotel 4 Incident Description 6 2.1 Accident Process Description 6 2.2 Incident Cause 7 2.3 Incident Consequences 8 3.0 Project Aims, Objective and Scope 9 4.0 Literature Review 10 4.1 Research Motivation 10 4.2 Asset Integrity Definition 12 4.3 Asset Integrity 12 4.4 Asset Integrity Management 13 4.5 Asset Integrity Challenges 14 4.6 Asset Integrity Framework 15 4.7 Current Development: Asset Integrity 16 4.8 Highlight – Asset Integrity Review 16 Methodology 17 5.1 Methodology Selection and Benefits 17 5.2 Fault Tree Analysis (FTA) Development 18 5.3 Human Error Element & Calculation 21 Analysis of Results 23 6.1 Qualitative Analysis 23 6.2 Quantitative Analysis 24 7.0 Conclusion 26 8.0 Recommendations 27 9.0 References 28 10.0 Appendix 31 2.0 5.0 6.0 1 LIST OF FIGURES 2 Figure 1: Oil-Rig Edda 2/7C & The Flotel Alexander L. Kielland 5 Figure 2: Accident Capsize Process 6 Figure 3: Schematic Diagram of Brace Arrangement Stress in Member D-6 7 Figure 4: Asset Integrity Classification 12 Figure 5: Fitness for Purpose Graph 14 Figure 6: Influence of AIM Challenges In Organizations with Offshore Petroleum Production Assets 15 Figure 7: FTA Based on the Probability of Failure In 1 year 19 Figure 8: FTA Based on the Probability of Failure In 10 years 20 Figure 9: Graphical Demonstration of the Probability of Failure and Reliability of the System Over Time 25 Figure 10: HEMP Cycle 27 LIST OF TABLES 2 Table 1: History of Asset Integrity Failures and Consequences 10 Table 2: Basic Events Probability of Failure 18 Table 3: Likelihood of Failure Calculation 22 Table 4: Probability of Failure and Reliability of the System in Years 25 APPENDIX: LIST OF TABLES 2 Table 5: Generic Task Unreliability 31 Table 6: Error Producing Conditions (EPC's) 32 2 1.0 ABSTRACT Asset Integrity is one of the drivers for operating installations safely (Ritchie 2011). A good number of accidents that have taken place in the past in oil installations and generally were due to ignorance or lack of asset integrity knowledge and management and resulted in catastrophic accidents such as Piper Alpha, Macondo Blowout (Ratnayake, 2012), Alexander L. Kielland flotel capsize and a host of others. Organizations often misunderstand asset Integrity as a mere financial burden (Tsang, 2002), and this misconception might relate to the school of thought that asset integrity is mainly linked to maintenance cost. This project is a case study of the Alexander L. Kielland flotel capsizes. The capsize of the semi-submersible 'flotel,' Alexander L Kielland, on March 27, 1980, in Norwegian waters killed 123 people of 212 men in total. With researched investigative reports on the accident, one of the five legs of the platform separated from the rest of the structure in a storm on the Ekofisk field in the North Sea. The failure started with the fatigue fracture of one of the lower tubular bracings attached to a vertical column. Laboratory tests, structural analyses and examination of fracture surfaces have established the following as the primary causes of the accident. In essence, poor material properties of the hydrophone tube and poor welding resulted in partial cracking of the double fillet weld joining the tube to a bracing. The crack continued in the early history of the platform initiating a redistribution of stresses, two fatigue cracks propagated in a pure fatigue mode for 60mm to 100mm from each initiation point at the hydrophone, the fractures in the five other bracings joining the leg to the platform were caused by overloading. Fatigue analysis indicated that the design fatigue life of the fillet weld at the hydrophone mount was inadequate. From the preliminary information, it is clear that this accident is a real example of an asset integrity failure. There are substantial gains in having and implementing a clear AIM strategy in offshore structures, and this paper would explore this link about Alexander L. Kielland failure. In this paper, the accident case with root causes will be analyzed further and will determine the boundary of the study. The accident model developed with cause-consequence analysis. Qualitative and quantitative analyses carried out to identify critical safety areas and functions and to determine the likelihood of failure of these measures for any existing or future installation to prevent future unwanted accidents. 3 1.1 INTRODUCTION / BACKGROUND: ALEXANDER L. KIELLAND FLOTEL In offshore operations, personnel required on production platforms are for various reasons, including: • Maintenance - this is the primary area of work, especially on older platforms • Drilling - covering drilling and well maintenance • Construction - covering offshore hook-up and commissioning, and on-going expansion projects, tie-in of satellite fields and the likes. • Production operations - relatively few operators, are required for a modern process. • Support - covering catering, administration, supplies, helicopter transport and safety. The total number of personnel required offshore may be as high as 300 on some large installations with construction programmes, but is typically in the range 40-150. The Offshore Installation Manager (OIM) is in overall command of the platform. The accommodation (or living quarters, LQ) is usually a fire-rated unit entered via air-lock doors and held at a small positive pressure to prevent the entry of gas. All or part of the LQ may be designated a temporary refuge (TR), where personnel can shelter from a fire or explosion. The process control room is often incorporated as part of the TR. In the Norwegian Sector, where Alexander L. Kielland operated under, the system is 2 on – 3 weeks off, 2 on - 4 weeks off, working roster, giving a total of 19 weeks per year. Most personnel work 12-hour shifts while offshore. About 75% of personnel work on the day-shift. During hook-up and commissioning (HUC), up to 300 extra construction personnel may be required offshore, and they are generally accommodated on a flotel, i.e. a semi-submersible accommodation platform anchored beside the platform and bridge-linked to it. The rig used as a flotel accommodated about 386 persons and located east of Dundee in Scottish waters. Stavanger Drilling Company owned the rig and, at the time of the incident, was leased to Phillips Petroleum. The semi-submersible rig was secured to the seafloor by six anchor cables, five of which broke during the stormy conditions causing the platform to tilt 4 and eventually, capsize after the remaining cable also snapped. The rig had on-board 50 man lifeboats and 20 man rafts and was built in 1976. It was characteristically 103m (338ft) in length with 99m (325ft) beam and weighed 10,105 tons. The rig was supported by five columns standing on five 22m pontoons and had a 40m full drilling deck. The five 8.5m diameter columns on the pontoon were interconnected by a network of horizontal and diagonal bracings with diameters of 2.6m and 2.2m respectively Figure 1: Oil-Rig Edda 2/7C and The Flotel Alexander L. Kielland-right 5 2.0 INCIDENT DESCRIPTION 2.1 ACCIDENT PROCESS DESCRIPTION At about 6:30 pm on March 27, 1980, the semi-submersible platform Alexander L. Kielland capsized near the Norwegian Ekofisk oil field in a storm with wind velocities from 16m/s to 20m/s. Under the circumstances, the prevailing temperatures were around 4 to 6 degrees centigrade and wave heights were in the region of 6 to 10m. The platform column broke off, and within seconds of the break, the platform tilted between 35 and 45 degrees and turned upside down within 30minutes. Figure 2: Accident Capsize Process 6 2.2 INCIDENT CAUSE: The failure sequence was identified as the loss of one vertical column, resulting in rig destabilization, with tilting of the entire structure leading to inversion and submersion. All the evidence confirmed the mechanism of the initial failure as a fatigue process, sited at a defective weld bead in an inserted hydrophone tube located in a robust brace designated D-6. Figure 3: Schematic diagram of brace arrangement Stress in Member D-6: A defined structural analysis indicated the relationship stresses in the members and wave data (environmental impact) in order to establish a complete failure analysis explaining the short fatigue life of the D-6 bracing and the sudden collapse of the D-leg. Considering the wind and wave data before the accident, the stress amplitude on the D6 bracing was computed to be in the range of 131 to173 MPa. This resulted in high-stress levels of the D6 bracing compared to the other horizontal bracing in the platform. From hindsight, the fatigue life of the D6 bracing with the hydrophone was calculated to be in the range of 0.7 to 5 years. 7 2.3 INCIDENT CONSEQUENCES: The consequences of offshore accidents can be critical. The failure of a design or piece of equipment could mean the loss of many lives and damage to the natural environment, not to mention the economic loss incurred by the company or industry involved. For this reason, offshore owners, operators, equipment manufacturers, and regulators all have a common purpose in following offshore regulations. Accidents can occur as a result of human error, forces of nature (hurricanes, typhoons, storms, and etcetera), equipment failures, and lack of adherence to established safety procedures. A significant monetary loss was incurred. Compensation paid to the bereaved families amounted to US$45 million, and the rig itself was valued at US$225 million. 8 3.0 PROJECT OBJECTIVE AND SCOPE The core objective of this project study is to review asset integrity management in the offshore industry and with a particular focus on the collapse of the Alexander L. Kielland flotel. The study will cover the accident process and analyze asset integrity failures contributing to the collapse of the flotel. In the accident process, an attempt shall be made to characterize the process, analyzing the cause’s layer-by-layer to unearth the most fundamental event failures resulting in the collapse. The Fault Tree Analysis methodology will be utilized here, which will typically include a quantitative and qualitative analysis of the accident process as well as analyze any human unreliability factors contributing to the accident. The limitations of this study include the constraints of time available to complete this work and the geographical location of the accident components in museums where we have not to be able to visit. Critical data mostly depended on includes expert published opinions for probability figures of the events leading to the accident. The project aims to, among other things: Establish the critical role of asset integrity and asset integrity management in offshore operations to mitigate such low-frequency high consequence accidents Establish the root cause of the Alexander L. Kielland accident and propose recommendations to avoid similar future occurrences. 9 4.0 LITERATURE REVIEW: 4.1 Research Motivation: A review of the literature shows there have been many marine industry-related incidents during the past few decades, which highlight the importance of asset integrity management. For each accident or incident, valuable lessons are learned for us to avoid similar situations from recurring in the future. Below is a summary of past major offshore oil and gas industry accidents related to asset integrity failures: Table 1: History of Asset Integrity Failures and Consequences Year Name of Facility Type of Accident Cause of Accident Consequences 1964 C.P. Baker Fire and Blowout 21 deaths and 22 injuries Drilling Barge Explosion preventer (Austin et al., 2008; Qi & (BOP) failure Ershaghi, 2013) Fatigue failure 13 deaths (Ismail et al., 1965 5 Sea Gem JU, UK Sinking 2014) Continental Shel 1974 Gemini JU, West Sinking Fatigue failure Africa 1980 Alexander L. 18 deaths (Ismail et al., 2014) Sinking Fatigue failure Kielland 123 deaths (Almar-Naess et al., 1984) Accident 1983 1983 Glomar Java Sea Sinking Fatigue failure Drillship Transportation Safety Accident Board. (NTSB), 1984) 60 years of Sinking Fatigue failure Azerbaijan 1998 Mobil’s Qua Al Mariyah, 5 deaths (Oil Rig Disasters, n.d.) Spill Fatigue failure Iboe, Nigeria 2000 81 deaths (National Spilled 40,000 barrels oil (Aghalino & Eyinla, 2009) Sinking Fatigue failure 4 deaths (Ismail et al., 2014) 10 Persian Gulf 2001 Petrobas’ P-36 Oil Platform, Rio De Janeiro, Brazil Explosion Fatigue failure 11 deaths (Videiro, Cyranka, Nunes, & Melo, 2002) 2010 Deepwater Horizon Explosion Explosion/Fire and Spill BOP Failure 11 deaths, 16 injuries (National Commission on the BP Deepwater Horizon Oil Spill, 2011) 2012 Elgin G4 Well, North Sea Spill Fatigue failure of casing due to corrosion Significant fluids leakage (Dale et al.,2013) The Ekofish Brovo accident that occurred on April 22, 1977, during an intervention to pull out tubing string in production well resulted in the most massive oil spill, as reported at the North Sea. From investigations, the Blowout preventer was not installed; the well kicked and an incorrectly installed downhole safety valve failed (Oil Rig Disasters, 2014). The failure consequence of the safety valve resulted in an oil and gas release. The official inquiry into the blowout established that human error was a significant factor that led to the failure of the safety valve. This includes faults in the installation documentation and equipment identification and misjudgments, improper planning and improper well control (Oil Rig Disasters, 2014). Based on the investigation findings, there was a series of asset integrity requirement which were neglected and caused the accident. The failure of a subsea oil pipeline 176km east of Aberdeen was reported from the Garnet F. oil field, and this resulted in an oil leak in 2011 (Department of Energy & Climate Change, 2011). Based on an initial investigation by Health and Safety Executives, it was discovered that the safety management system audit scheduled in 2008 for the leaking pipeline had not been carried out before the incident (BBC News, 2012). Following the finding from the initial investigation conducted on the leak, Shell has increased education on reducing hydrocarbon leaks within operations and increased tremendous focus on asset integrity of subsea assets (Shell U.K. Limited, 2012). These selected examples of oil and gas landmark accidents happened in the past decades with devastating consequences. Consequently, asset integrity is a must for all subsea installation facilities and must be maintained at the highest possible standard at any given time. Offshore installations have unique circumstances considering its 11 remoteness. As such, asset integrity must be of the highest priority in the offshore project lifecycle. 4.2 Asset Integrity Definition: An asset is a module from which the economic owner can derive a benefit in the future accounting period by using the entity over some time (Harrison, United Nations statistics division, 2006). As also defined by, the Institute of Asset Management, asset management is a set of systematic, well-coordinated activities and practices through which an industry optimally and sustainably manages its assets and asset systems, their associated performance, their risks and expenditures over their life cycles to achieve its organizational strategic plan (PAS 551:2008 Asset Management, 2008). UK Health and Safety Executive (2009) - KP3 program clarifies asset integrity as the capacity of an effect or a system to perform its required function effectively and efficiently over some time while protecting health, safety and the environment. 4.3 Asset Integrity: Asset integrity can is divided into design integrity, technical integrity and operation integrity, as illustrated below. (Mohamed, Mohamed, Drahib, & Badyab, 2012). Figure 4: Asset Integrity classification 12 Design integrity assures that facilities are designed following governing standards and meet specified operating requirements without compromising on safety, accessibility, operability and maintainability. (Baby, 2008). Technical integrity is defined as the evolution of a design that is carried out by well-trained working personnel, who have been considered to be competent per defined practices with procedures and adequate provision for reviews. Audits to ensure the design intent is operational in a manner that could cause harm to people or damage to the environment (Bale & Edwards, 2008). Asset technical integrity refers to a state Where the technical condition of assets, incorporates all related operations and business processes as a process to ensure that there will be no harm to people, property or the environment (Rahim, Refsdal, & Kenett, 2010). Operational integrity addresses operations within an asset’s framework, as defined by technical barriers. Appropriate knowledge, required experience, adequate management, competent human resources and appropriate data for making decisions are vital to operating the plant as intended throughout the asset lifecycle (Baby, 2008). Asset integrity must stay compliant to national, regulatory, company policies and standards as adapted to the requirements of the industry as well as international standards and regulations. It must encompass asset; staying fit for purpose, operating under all circumstances and safely and reliably within design parameters whiles being inefficient operating mode. Asset integrity practices ensure that all suitable checks, processes and reviews are in place to safeguard the asset whiles firstly ensuring that the asset design, construction, installation, operation and maintenance are to a tolerable and acceptable risk level as defined by the ALARP concept. (Dutta & Madi, 2014). 4.4 Asset Integrity Management: Most Marine, mining companies and other industries use asset integrity management to manage asset integrity activities in various stages of an asset’s lifecycle. Department of Mines and Petroleum (2012) refer to asset integrity as fitness for purpose (FFP) as demonstrated in the below. 13 Figure 5: Fitness for purpose graph The asset lifecycle can be grouped into five phases, namely; design, installation, commissioning, operation and decommissioning. The asset integrity strategies, policies, procedures and schemes are developed in the early stage of assets when the failure frequencies are decreasing. During the operation phase, the asset design requires reappraisal, and for the design life extension, additional measures can be taken. After the design life and in operations, asset failure frequency increases. Asset integrity management is practiced throughout the whole project life cycle. Heavy emphasis is laid on design integrity at the concept definition and selection phase to establish the base for asset integrity. Upon starting the project execution phase, the focus will be on technical integrity. The process will continue even after the project has been handed over to the operation team in the operating phase. In the operational phase, the asset needs to be maintained for integrity assurance. 4.5 Asset Integrity Challenges The primary motivation for organizations is to manage their assets is to maximize profit. However, on the contrary, there are organizations’ that avoid AIM due to the fear of AIM costs. A research study was conducted to discover the gap between theory and practices of AIM in organizations’ offshore production installations within industry practitioners located in Houston, Texas, USA, Singapore and Norway using face-to-face interviews and then using questionnaires. From the study, the following vital challenges were unearthed: Organizational 14 challenges, Human Resource Challenges, Knowledge Management and IT, Offshore Installation Challenges, External Organizational Challenges, Site characteristics, Challenges and Economic Challenges. Figure 6: Influence of AIM challenges in organizations with offshore petroleum production assets 4.6 Asset Integrity Framework A structure for asset integrity is useful for achieving the aims of ensuring that subsea asset meets their complete life cycle usage. Such a framework will require structured and systematic and yet continuous monitoring of activities right from concept definition and selection stage through engineering, procurement, manufacturing, construction, installation and installation stages. The same concept is applied when the asset is already in operation through to inspection and maintenance. All these activities within the framework of asset integrity will help meet the organization's asset integrity objectives. Within the limits of this framework, organizations can demonstrate that they are safe and fit for purpose and hence able to prove the same. 15 4.7 Current Developments – Asset Integrity Most studies carried out on Marine, oil and gas asset integrity happen during the operation phase. For example, Thivend (2010), Shirazi, et al. (2012), Rezaei & Abbas (2013), Khiani (2013), Zaki & Sijm (2014) showcased asset integrity during asset operating phase or abandonment phase. Minimal emphasis and studies were carried out about asset integrity during the project stage, inclusive of concept design, detailed engineering, manufacturing, installation and recommissioning stages. It has been found that no notable studies have been carried out on integrity during the project phase, including subsea assets. Botto, Rees, & Hull (2011) firmly believed that there is no universal or widely accepted, consistent, systematic approach for the development of risk-based subsea integrity management system. Only selected safety-critical elements (SCE) are emphasized, establishing integrity management without considering the whole subsea asset with a systematic approach. The provided asset integrity management framework and its implementation need to be adequately assessed to establish an asset integrity framework for subsea assets during the project phase. This is to determine how project organizations can assure subsea asset integrity at the project phase, to identify obstacles of implementing subsea assets integrity and to develop an asset integrity framework for subsea assets during the project phase. 4.8 Highlight – Asset Integrity Review Subsea asset management framework highlights out strategies to manage the risks associated with assets in a very systematic manner. A robust and rigorous subsea asset integrity framework will safeguard subsea assets and assure that subsea assets will perform its required function effectively and efficiently while protecting health, safety and the environment. 16 5.0 METHODOLOGY 5.1 Methodology Selection and Benefits: A Fault Tree Analysis (FTA) is a recognized procedure used to determine component or event failures as well as human unreliability factors that results in specific undesirable events or outcomes at the system level utilizing a deductive approach (Ang and Tang (1984)). It is a diagrammatic method used to evaluate the probability of an accident resulting from sequences and combinations of faults and failure events. This method can is used to analyze the vast majority of industrial system reliability challenges. FTA is based on the idea that: 1. A failure in a system can trigger other consequent failures. 2. A problem might be traced back to its root causes. The identified failures can be arranged in a tree structure in such a way that their relationships can be characterized and evaluated. Benefits of FT: There are several benefits of employing FTA for use as a safety assessment tool. These include: 1. The Fault Tree (FT) construction focuses the attention of the analyst on one particular undesired system failure mode, which is usually identified as the most critical to the desired function (Andrews and Moss (2002)). 2. The FT diagram can be used to help communicate the results of the analysis to peers, supervisors and subordinates. It is particularly useful in multi-disciplinary teams with the numerical performance measures. 3. Qualitative analysis often reveals the most important system features. 4. Using component failure data, the FT can be quantified. 5. The qualitative and quantitative results together provide the decision-maker with an objective means of measuring the adequacy of the system design. An FT describes an accident model, which interprets the relation between malfunction of components and observed symptoms. Thus the FT is useful for understanding the mode of occurrence of an accident logically. Furthermore, given the failure probabilities of the corresponding components or events, the probability of a top event occurring can be calculated. 17 5.2 Fault Tree Analysis (FTA) Development The Fault Tree Analysis (FTA) utilizes the quantified probability of occurrence, as well as logic and straightforward to relate events to each other appropriately. It also provides an idea regarding the relationship between the main root cause and contributing factors in a graphical representation. Basic Boolean algebra is then capable of determining the probability of associated fault leading to the failure, which this case study started with the fatigue fracture of one of the lower tubular bracings attached to a vertical column. The assigned probabilities of failure in 1 year, are taken from expert opinion and previous data from various gasoline storage facilities. (Rathnayaka et al., 2011), as shown in Table 1. The calculated failure rate per year and the probability of failure in 10 years are generated from the FTA showed in Figures 7 and Figure 8, as part of the established basic event probability of failure. Table 2: Basic events probability of failure Basic Failure Event HF: Insufficient Boat Platform submerge Uncontrolled sea wave HF: Inadequate method of inspection HF: Weld degradation monitoring specified but not performed HF: Inadequate quality assurance HF: Unaware on environmental force HF: Inadequate design for durability HF: Personnel inexperience HF: Poor construction HF: Lack of design checking and verification Hydrophone attached to brace System-level Probability of failure (Top Event) Assumed probability of failure in 1 year 0.259 0.500 0.465 0.090 0.300 0.693 0.625 0.094 Probability of failure in 10 years 0.950 0.999 0.998 0.611 0.050 0.010 0.020 0.010 0.200 0.010 0.051 0.010 0.020 0.010 0.223 0.010 0.401 0.096 0.183 0.893 0.893 0.096 0.090 0.400 0.094 0.511 0.611 0.994 0.129 Calculated failure rate/year 0.949 NB: Human Factor is denoted as HF. 18 FTA-1: Fault Tree Analysis of Flotel Capsize in year 1 Figure 7: FTA based on the probability of failure in 1 year 19 FTA-2: Fault Tree Analysis of Flotel Capsize in year 10 Figure 8: FTA based on the probability of failure in 10 years 20 5.3 HUMAN ERROR ELEMENT/CALCULATION: There is always a level of error while working with any process. The error could be due to equipment or its component wearing after a set of some cycle or process itself becomes inefficient to maintain accuracy. However, equipment may fail due to the unintentional fault of humans. Human error is the term used to describe the interaction of individuals with each other, facility and equipment as well as with management system. “’ Human Error is defined as "departure from acceptable or planned action on the part of an individual that can result in unacceptable or undesirable results," (Assael, M. J., & Kakosimos, K. E. (2010)). The human factor can influence on every layer of protection that is used to prevent an incident. As per the survey conducted by the Battle Memorial institute, out of 136 industrial incidents, 47% of the causes identified involved human error while 53% were due to equipment failure. (Assael, M. J., & Kakosimos, K. E. (2010)). This analysis shows the importance of the human factor contribution to hazard identification. It is difficult to calculate, prevent and detect human error than equipment. Human to human, it varies, and therefore, the risk of human error cannot be eliminated. However, proper data gathering and intensive analysis of these data can give a proper idea of the potential human error, and after that, risk can be managed. In this case study, there is an analysis of human factors as some contributory human error factors are resulting in a fatal accident. In the fault tree analysis, various forms of human errors were displayed such as; a) Installing a hydrophone without proper analysis. Management of change (MOC) process can address the risk of changes. b) Applying fillet welding on installing hydrophones was another significant misstep as it has comparatively less stress that we presented in welding calculation review and should be used in a harsh environment. c) The asset integrity management was poor, or event not established to monitor the integrity of welding and overall structure. A preventive measure could have been taken before an accident if this strategy were established or maintained correctly. d) Many lifeboats were not sufficient leading consequence upsurge. The emergency management process should be considered. The assigned probabilities are taken from experts’ opinions and previous data from similar facilities (Rathnayaka et al., 2011). 21 Assumptions: A miscellaneous generic task (M) for which no description can be found from tables in appendices; hence, the proposed nominal human unreliability is 0.03 and Assessed Proportion of Effect (APOE) data are gathered from appendix table 2; Table 3: Likelihood of failure calculation EPC’s Multiplier APOE Inspections performed but failed to detect ×4 0.15 Assessed Effect (Max. Effect − 1)x APOE) + 1 (4 − 1) × 0.15 + 1 = 1.45 Inspections specified but not performed ×4 0.015 (4 − 1) × 0.015 + 1 = 1.045 Weld degradation monitoring performed but failed to detect ×3 0.066 (3 − 1) × 0.066 + 1 = 1.132 Weld degradation monitoring specified but not performed ×3 0.05 (3 − 1) × 0.6 + 1 = 1.1 Poor construction ×3 0.01 (3 − 1) × 0.01 + 1 = 1.02 Inadequate methods or inspection program × 1.4 0.09 (1.4 − 1) × 0.09 + 1 = 1.036 Lack of design checking and verification ×3 0.09 (3 − 1) × 0.09 + 1 = 1.18 Inadequate quality assurance in design and quality ×3 0.01 (3 − 1) × 0.01 + 1 = 1.02 Understanding of environmental forces × 1.15 0.02 (1.15 − 1) × 0.02 + 1 = 1.003 Inadequate design for durability × 1.4 0.01 (1.4 − 1) × 0.01 + 1 = 1.004 Therefore, the average likelihood of failure can be computed as: (0.03 × 1.45 × 1.045 × 1.132 × 1.1 × 1.2 × 1.036 × 1.18 × 1.02 × 1.003 × 1.004) = 0.0853 22 6.0 ANALYSIS OF RESULTS: The analysis begins with the top event of fault tree diagram and analyzing its causes layer-bylayer, until finding the critical events of the accident, that is, the essential event(s) of the fault tree. The case fault tree analysis mainly includes the following: 6.1 Qualitative analysis: In this part of the analysis, an attempt to determine the regularity and characteristics of the capsize of the Alexander L Kielland flotel. Such kinds of accidents fall in the category of accidents with a little chance of occurrences but with a very high level of consequences should the failure occur. Several events occurrences led the top event, in this case, the fatality of 123 people. These events are grouped into basic events and intermediate events. In the case study we identification was made of the following as the basic events (refer to FTA 2); Insufficient lifeboats, platform deck submerge, uncontrolled sea waves, inadequate inspection method, unperformed welding degradation monitoring, inadequate quality assurance, lack of awareness of environmental forces, inadequate design for durability, personnel inexperience, poor construction, lack of design checking and verification & hydrophone attached to brace. Identification was also made of the intermediate events leading up to the accident as; offshore structure capsizes, structure footing breaking off, brace cut-off, welding defect, lack of inspection to monitor fatigue condition, fillet welding applied and poor welding quality. With our analysis, we focused on the events of interest until we get to the most basic events. The fatality of 123 people was the direct and immediate result of the offshore structure capsizing and a lack of sufficient boats available of the flotel available to save lives, these two events happening simultaneously hence represented by the “AND” logic gate. The events leading up to this intermediate event of offshore structure capsize the result of the structure’s footing breaking off and the platform deck submerging, the two events happening in the same time-space hence the “AND” logic gate representation. The structures footing breaking off, being our event of interest, are further analyzed to determine the cause of this incident. This concludes as the result of uncontrollable sea waves and the brace cutoff of the rig, which two events were occurring simultaneously and hence the “AND” logic gate. The brace cutoff, our next event of interest here, is further broken down into two causative events co-occurring, namely, a lack of inspection which could have exposed and monitored the fatigue crack that 23 developed in the bracing and the welding defect on the bracing. The two intermediate events are further analyzed to determine essential events that led to the main accident, the top event. The lack of inspection to monitor fatigue condition is the result of any one of the four identified basic events, i.e. inadequate inspection, weld degradation monitoring specified but not performed, inadequate quality assurance or lack of awareness of environmental forces. Since it is the result of one or the other of any of the stated basic events, and not all co-occurring, the “OR” logic gate is used in the representation in the FTA diagram. The other two events of interest leading to the welding defect, i.e. “the fillet welding applied” and the “poor welding quality,” are further analyzed to determine its most basic events leading up to those causes. In “the fillet welding applied” event, both inadequate design for durability and personnel inexperience must both occur for the fillet welding applied event, hence the “AND” logic gate utilized. In the poor welding quality, either “poor construction” or “a lack of design checking and verification” could have lead up to the poor welding quality event. However, all three events of “fillet welding applied,” “poor welding quality,” and “hydrophone attached to brace” must all have occurred to result in the welding defect, and this is therefore represented by the “AND” logic gate in the FTA diagram. In conclusion, the qualitative analysis of the FTA is hinged on the determination of the minimal cut set, defined as the set of basic events that cause the top event to happen. In this case, the minimal cut set: inadequate method of inspection, weld degradation monitoring specified but not performed, inadequate quality assurance, lack of awareness of environmental forces, inadequate design for durability, personnel inexperience, poor construction, lack of design checking and verification and hydrophone attached to brace. 6.2 Quantitative analysis: This is intended to obtain the probability of accidents over time- based on sets of events. It also provides the probability of basic events. Therefore, which element makes a significant contribution to leading to the accident can be easily obtained. In this study, a quantitative fault tree analysis is performed to identify the probability of failure over time and quantified the contribution of the basic elements towards the occurrence of the unwanted event. Also identified are a set of human errors and physical failures that contributed to let Flotel structures capsize through the human error calculation. It is evident that over time, the probability of failure increased while reliability decreased. By using ISOGRAPH Reliability workbench software (version 14.0), the identified system-level probability of failure for each year is as follows. 24 Table 4: Probability of failure and Reliability of the system in years T (Year) Probability of failure, Q Reliability, R 1 2 3 4 5 6 7 8 9 10 0.129 0.338 0.519 0.656 0.753 0.821 0.870 0.906 0.931 0.949 0.871 0.662 0.481 0.344 0.247 0.179 0.130 0.094 0.069 0.051 Based on this data and putting these into a graph, the probability of failure and reliability over time is gained. Probability of failure,Q /Reliability, R Probability of failure and Reliability over time 1.000 0.900 0.800 0.700 0.600 0.500 0.400 0.300 0.200 0.100 0.000 1 2 3 4 5 6 7 8 9 10 Years, T Q R Figure 9: Graphical demonstration of the probability of failure and Reliability of the system over time Considering the assumed unreliability of basic elements and if it is considered that when the system-level probability of failure reaches 75%, the operation should be stopped and reevaluated in 5 years. However, this may not be cost-effective by utilizing such an expensive offshore structure for only five (5) years. Therefore, quality assurance, robust maintenance encapsulated in a comprehensive asset integrity framework is required to improve the reliability of basic events. 25 7.0 CONCLUSION Focus on the conclusion is centred on finding solutions to the key critical basic events that led to the top event comprising: The design should be based on analytical research, experimental findings and experience and must also meet any regulatory fatigue and fracture standards whiles very experienced offshore welders should be used to undertake such critical activity as applying a fillet welding and or subsea welding The design should be checked for failure based on strength, stiffness, stability, wear, as well as with the various theories of elastic failures as applicable to the selected material of construction. This will ultimately minimize any potential incident associated with a poor welding job in a subsea structure as the semi-submersible flotel In the case of the hydrophone attached to the brace, engineers must select the appropriate fatigue strength curve as per the details of the use of the component Selection of material of construction should be after considering all possible concerns affecting fatigue Designers and engineers should be knowledgeable and experienced to interpret and mitigate contributory human unreliability factors Detailing out strategies necessary to manage the risks associated with subsea assets in a systematic modus to maintain the integrity of the asset throughout its lifecycle is one of the primary aims of the subsea asset management framework. A robust and rigorous subsea asset integrity framework will safeguard subsea assets and assure that subsea assets will perform its required function effectively and efficiently while protecting health, safety and the environment. 26 8.0 RECOMMENDATION The aim of having and implementing a robust asset integrity framework to the letter is to develop the Hazards and Effects Management Process (HEMP), which identifies and assesses. Health Safety and Environmental (HSE) hazards and potential risk, implement control and recovery measures and maintains a documented demonstration that HSE risks have been reduced to a level that is As Low As Reasonably Practicable (ALARP). HEMP should be applied to all activities and should cover the entire lifecycle of the asset or operation (from inspection through decommissioning to disposal). HEMP should also be applied to all significant HSE hazards; workplace related HSE hazards as well as environmental hazards. Figure 10: HEMP Cycle 27 9.0 1. REFERENCES Mayang, K., Rajesh, K. and Markeset, T., (2016). Asset Integrity Management: Offshore Installations Challenges. JQME Vol22, No3 2. Adrian, B., (2018). Alexander L. Kielland platform capsizes accident. Loss Prevention Bulletin, 261 3. Alexander L. Kielland platform capsizes accident – investigation report. Retrieved from https://officerofthewatch.com/2013/04/29/alexander-l-kielland-platformcapsize-accident/ 4. Kitsunai, Y. & Kobayashi, H. Capsize of offshore oil drilling platform. Failure Knowledge Database/100 Selected Cases. 5. Vatanparast S., (2016), Asset Integrity in Oil, Gas Drilling Operations: Key Factors in Maintenance, Safety. 6. Almar-Naess, A. & Moan, Torgeir & Haagensen, Per & Lian, Bjøm. (1982). Investigation of the Alexander L. Kielland Failure—Metallurgical and Fracture Analysis. J. Energy Resour. Technol.. 106. 10.1115/1.3231014. 7. Xue, L., Fan, J., Rausand, M., & Zhang, L. (2013). A safety barrier-based accident model for offshore drilling blowouts. Journal of Loss Prevention in the Process Industries, 26(1), 164–171. doi: 10.1016/j.jlp.2012.10.008 8. Sklet, S. (2006). Safety barriers: Definition, classification, and performance. Journal of Loss Prevention in the Process Industries, 19(5), 494–506. doi: 10.1016/j.jlp.2005.12.004 9. Hassan, Zulkifly & Khairi, Mohd & Abu Husain, Mohd Khairi & Venture, Fpso & Bhd, Sdn & Level, & Perak, Menara & Lumpur, Kuala & Malaysia,. (2013). Risk-Based Asset Integrity Management for Offshore Floating Facilities in Malaysia 10. IChemE. (n.d.). Piper Alpha Perspectives. Retrieved from https://www.thechemicalengineer.com/features/piper-alpha-perspectives-mag-intro/ 28 11. Ratnayake, R. C. (2012). Modelling of asset integrity management process: a case study for computing operational integrity preference weights. International Journal of Computational Systems Engineering, 1(1), 3. doi: 10.1504/ijcsyse.2012.044738 12. Ramzali, N., Lavasani, M. R. M., & Ghodousi, J. (2015). Safety barriers analysis of offshore drilling system by employing Fuzzy Event Tree Analysis. Safety Science, 78, 49–59. doi: 10.1016/j.ssci.2015.04.004 13. Fang, Huacan Duan, Menglan. (2014). Offshore Operation Facilities - Equipment and Procedures - 7.4.1.1 Fault Trees and Fault Tree Analysis. Elsevier. Retrieved from https://app.knovel.com/hotlink/pdf/id:kt00U8FQ02/offshore-operation-facilities/fault-treesfault-tree 14. Assael, M., Kakosimos, K. (2010). Fires, Explosions, and Toxic Gas Dispersions. Boca Raton: CRC Press, https://doi-org.qe2a-proxy.mun.ca/10.1201/9781439826768 15. Almar-Naess, Haagensen, Lian, Moan, & Simonsen. (1984). Investigation of the Alexander L. Kielland failure -- metallurgical and fracture analysis. Transactions of the ASME. Journal of Energy Resources Technology, 106(1), 24-31. 16. Rama Rao, A., Srinivasa Rao, S., Sharma, T., & Rama Krishna, K. (2012, January 1). Asset Integrity Management in Onshore & Offshore-enhancing Reliability at KGD6. Society of Petroleum Engineers. doi:10.2118/153510-MS 17. Khan, Faisal Abbassi, Rouzbeh. (2018). Methods in Chemical Process Safety Offshore Process Safety, Volume 2 - 1.5.1 Analysis of Marine Accidents. Elsevier. Retrieved from https://app.knovel.com/hotlink/pdf/id:kt011Q4HD1/methods-in-chemical-process/analysismarine-accidents 18. Ramasamy, J., & Yusof, S. (2015). A Literature Review of Subsea Asset Integrity Framework for Project Execution Phase. Procedia Manufacturing, 4, 79-88. 19. Kusumawardhani, M., Kumar, R., & Tore, M. (2016). Asset integrity management: Offshore installations challenges. Journal of Quality in Maintenance Engineering, 22(3), 238251. 20. Pillay, Anand Wang, Jin. (2003). Technology and Safety of Marine Systems - 3.11 Failure Mode, Effects and Critical Analysis (FMECA). Elsevier. Retrieved from https://app.knovel.com/hotlink/pdf/id:kt009A0AI1/technology-safety-marine/failure-modeeffects 29 21. Milne, I. Ritchie, R.O. Karihaloo, B.. (2003). Comprehensive Structural Integrity, Volumes 1-10 - 1.05.3.1 Loss of the Alexander L. Kielland Accommodation Platform. Elsevier. Retrieved from https://app.knovel.com/hotlink/pdf/id:kt004RBR62/comprehensive-structural/loss-alexanderl-kielland 22. Kitunai, Y., & Kobayashi, H. Capsize of Offshore Oil Drilling Platform. Failure Knowledge Database, 1-9. 23. Spouge, John. (1999). Guide to Quantitative Risk Assessment for Offshore Installations – Energy Institute. Retrieved from https://app.knovel.com/hotlink/pdf/id:kt00BG1PQ1/guide-quantitative-risk/an-outlinereferences 23. Sutton, Ian. (2014). Offshore Safety Management - Implementing a SEMS Program (2nd Edition) 2.4.2 Elements of SEMS. Elsevier. Retrieved from https://app.knovel.com/hotlink/pdf/id:kt01148NV1/offshore-safety-management/alexander-elements-sems 24. https://en.wikipedia.org/wiki/Alexander_L._Kielland_(platform)#/media/File:Alexan der_L_Kielland_and_Edda_2-7C_NOMF-02663-1-650.jpg 30 10.0 APPENDIX 10.1 Table 5 31 10.2 Table 6 32
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )