Mee�ng with EPD (7/3/2025)
1) Spelling error
2) What was writen on the text did tally with what was shown in the map.
3) Technical report like SI, ESCP and etc, must inform their statuses in the report
4) Stakeholder engagement: focus on the ones that are likely to be most affected by the project.
5) Jambongan project: must conduct marine baseline in the future if other part of the area needs to be
explored/
:must know the background of the project and impacts that follow
6) Maps: incomplete, show the buffer for the forest reserve, must include the complete mi�ga�on measures
in map
7) Experts in EIA: the first thing that will be thoroughly checked by EPD
8) The arrangement of paragraphs or chapters did not follow with what was stated in EPD Handbook.
9) Write to JPS to ask whether ESCP is required in that certain area (project site).