Project No
Unit
00
Project Doc. PTJ-MS-13-00026
Rev
6
079254C
Page 1 of 3
ASSIUT HYDROCKRACKING COMPLEX –ANOPCASSIUT EGYPT
COMPANY: ……Petrojet……………………………
LAST MINUTE - JHA
JHA Addendum – to MS ………… PTJ-MS-13-00026……………………………….
Occasional Job
PTW N°: …………………………….
AREA: …………………………….
DATE OF ANALYSIS: …14………/…09٠……/…2025………
Repeated operation ( MS and JHA to be reviewed and resubmitted)
JOB: Using Manlift in piping erection
TIEB Tech reviewer Approval :
Tieb HSE Review:
Name & Surname: …………………………………………………
Name & Surname: …………………………………………
Signature: …………………………………………………………..
Signature: …………………………………………………..
Sub PTW Receiver:
Name & Surname: …………………………………………………
Sub HSE Supervisor:
Signature: …………………………………………………………..
Name & Surname: …………………………………………
Signature: …………………………………………………..
This Job hazard Analysis is to established proper risk evaluation of the activity that were not foreseen and considered in the mian MS & JHA analysis and required additional pracaution . Present JHA shall be
considered a temporary addendum to the JHA & PTW and is valid for one day and single activity .
STEP
HAZARD
PREVENTIVE MEASURE
Project No
Unit
00
Project Doc. PTJ-MS-13-00026
Rev
6
079254C
Page 2 of 3
ASSIUT HYDROCKRACKING COMPLEX –ANOPCASSIUT EGYPT
LAST MINUTE - JHA
Using a Manlift
Tip over
•
استخدام مان لفت
اﻻنقﻼب
•
ذو كفاءة
Dropped objects
ساقط أش اء
•
Contact with ceilings and
•
other overhead objects
التﻼمس مع اﻷسقف و ما فوق الرأس
Use only certified / inspected equipment / operators by third
party company
•
•
جب استعمال معدات مفحوصة و لها شهادة معايرة مشغل
•
Ensure that access gates or openings are closed.
• التأ د من غلق البوا ات و الفتحات
Do not climb on or lean over guardrails or handrails.
• عدم ال سلق أو اﻹنحناء ع الحواجز الخاصة المان لفت
Use a body harness with a lanyard attached to the bucket.
• إرتداء حزام اﻷمان ا مانع السقوط و ر طه ال اسكت
Do not exceed the load-capacity limits. Take the combined weight
of the worker(s), tools and materials into account when
calculating the load
ﻻ تتعدى الوزن المسم ح ه أخذ الوزن جن ا إ جنب للعامل و
اﻷدوات والمواد اﻻعت ار عند حساب الحمل
Do not use the Man lift as a crane.
ﻻ ستخدم المان لفت كرافعة أحمال
• proper storage of nuts and bolts at height
جب التخ ن الج د للصوام ل والمسام خصوصا عند العمل
ع ارتفاعات
•
•
Ensure presence of worker in assistance at the ground level in
case of emergency
• التأ د من وجود عمال ع اﻷرض للمساعدة حالة حدوث
حالة طارئة
•
Ensure that area under the basket is segregated and proper signs are
•
•
Project No
Unit
00
Project Doc. PTJ-MS-13-00026
Rev
6
079254C
Page 3 of 3
ASSIUT HYDROCKRACKING COMPLEX –ANOPCASSIUT EGYPT
LAST MINUTE - JHA
installed
وﻻفتات تحذي ة
•
•
التأ د من إحاطة المنطقة اسفل المان اسكت ووضع عﻼمات
•
Do not drive with the lift platform raised
(unless the manufacturer’s instructions allow this).
حالة
ﻻ يتم ق ادة المان لفت و منصة العمل مرفوعة ) إﻻ
(تعل مات المصنع
• Do not exceed vertical or horizontal reach
• limits.
ﻻ تتجاوز الحدود اﻷفق ة أو الرأس ة للمعدة
• Do not operate man lift in high winds above
those recommended by the manufacturer.
•
•
عات ال اح العال ة أو فوق تعل مات المصنع
ﻻ يتم شغ ل المعدة
Do not override hydraulic, mechanical, or
electrical safety devices
ﻻ يتم تجاوز أي من أجهزة اﻷمان الموجودة المعدة
Do not carry objects larger than the platform.
ﻻ تحمل أش اء ا من مساحة منصة العمل
Be aware of overhead clearance and overhead objects
التأ د من خلو المنطقة فوق الرأس من أي أش اء او اسقف
•
•
•
•
•
•
•
•
•