Page i Operations & Supply Chain Management Eighth Canadian Edition William J. Stevenson Saunders College of Business Rochester Institute of Technology Hydeh Mottaghi George Brown College Behrouz Bakhtiari McMaster University Page ii Published by McGraw Hill 145 King Street West, Suite 1501 Toronto, Ontario, Canada, M5H 1J8 Telephone: 1-800-565-5758 Website: www.mheducation.ca Operations & Supply Chain Management, Eighth Canadian Edition William J. Stevenson, Hydeh Mottaghi, Behrouz Bakhtiari ISBN-13: 978-1-26-485587-2 ISBN-10: 1-26-485587-7 Library of Congress Cataloguing in Publication Data The Library of Congress data for this book has been applied for from the Library of Congress. 1 2 3 4 5 6 7 8 9 10 M 30 29 28 27 26 25 24 Printed and bound in Canada. VP, Product and Production, Canada: Rhondda McNabb Senior Portfolio Manager: Amy Clarke-Spencley Marketing Manager: Anna Wojdylo Content Developer: Stephanie Schwartz Portfolio Associate: Tracey Hanson Senior Supervising Editor: Janie Deneau Photo/Permissions Editor: Photo Affairs Copy Editor: Leanne Rancourt Plant Production Coordinator: Sarah Strynatka Manufacturing Production Coordinator: Jason Stubner Interior Designer: Lightbox Visual Communication Inc. Cover Designer: Straive Cover Image: © Suriyapong Thongsawang/Moment/Getty Images Page Layout: Straive Printer: Marquis Operations Management, 14e © 2021 by McGraw Hill. Adaptation Copyright © 2024 by McGraw-Hill Ryerson Limited. In the case of photocopying or other reprographic copying, seek a licence from The Canadian Copyright Licensing Agency (Access Copyright). For an Access Copyright licence, visit www.accesscopyright.ca or call toll-free to 1-800-893-5777. Published by arrangement with McGraw Hill LLC ALL RIGHTS RESERVED. NO PART OF THIS BOOK MAY BE REPRODUCED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS, ELECTRONIC OR MECHANICAL, INCLUDING PHOTOCOPYING, RECORDING OR BY INFORMATION STORAGE AND RETRIEVAL SYSTEMS, WITHOUT PERMISSION IN WRITING FROM MCGRAW HILL. Fictitious names of companies, products, people, characters and/or data that may be used herein (in case studies or in examples) are not intended to represent any real individual, company, product or event. ISBN-13: 978-1-26-485587-2 ISBN-10: 1-26-485587-7 eISBN-10: 1-26-580598-2 © 2024. Exclusive rights by McGraw Hill for manufacture and export. This book cannot be re-exported from the country to which it is sold by McGraw Hill. About the Authors William Stevenson Page iii Saunders College of Business Rochester Institute of Technology This book is dedicated to you. Dr. William Stevenson is an associate professor of decision sciences in the Saunders College of Business at Rochester Institute of Technology. He teaches graduate and undergraduate courses in operations management, management science, quality concepts, and quality applications. He is the author of textbooks/ebooks in management science and statistics, as well as operations management. His articles have appeared in Management Science, Decision Sciences, Quality Progress, and other journals. Dr. Stevenson received a bachelor’s degree in industrial engineering, an M.B.A., and a Ph.D. in production/operations management from Syracuse University. Hydeh Mottaghi Centre for Business George Brown College I dedicate this book to my loving husband, Kambiz. Dr. Hydeh Mottaghi is a tenured professor at George Brown College and sessional lecturer at Trent University. She teaches logistics and supply chain management, operations management, procurement, statistics, and project management for both undergraduate and graduate programs. She was also a tenured professor at National University where she taught several courses in supply chain management and operations management for more than 25 years. She received her B.Sc. in industrial management from National University, and her M.B.A. and Ph.D in operations research from Tehran University with the highest honour. Dr. Mottaghi worked for several years in the industrial engineering department at Grundig Electronics as an industrial engineer, project manager, and consultant to the CEO where she completed several projects in lean Six Sigma, total quality management, automation, and layout. She is the author of several textbooks in the operations management field. She is also a published author in many peerreviewed journals. Behrouz Bakhtiari DeGroote School of Business McMaster University To Setareh and Tara Dr. Behrouz Bakhtiari is an assistant professor of operations management at DeGroote School of Business, McMaster University. He teaches courses in business analytics, operations management, statistics, data analysis, and predictive analytics at both graduate and undergraduate levels. Dr. Bakhtiari received a bachelor’s degree in industrial engineering, a master’s degree in production and operations management from Chalmers University of Technology, and a Ph.D. in business administration, with a specialization in management science, from McMaster University. Dr. Bakhtiari is currently the director of the blended learning part-time M.B.A. program at DeGroote School of Business. Brief Contents Page iv PREFACE 1 Introduction to Operations Management 2 Competitiveness, Strategic Planning, and Productivity 3 Demand Forecasting 4 Product and Service Design 5 Strategic Capacity Planning 6 Process Design and Facility Layout 7 Work/Job Design 8 Global Location Planning and Analysis 9 Quality Management and Six Sigma 10 Statistical Quality Control 11 Inventory Management 12 Aggregate Operations Planning and Master Scheduling 13 MRP, DRP, and ERP 14 Just-in-Time and Lean Production 15 Supply Chain Management and Logistics 16 Job and Staff Scheduling 17 Project Management 18 Waiting-Line Analysis Appendix A: Appendix B: Appendix C: Answers to Selected Problems Tables Working with the Normal Distribution Endnotes Index Chapter Supplements Available on Connect Chapter 4S Reliability Chapter 5S Decision Theory Chapter 6S Linear Programming Chapter 7S Learning Curves Chapter 8S The Transportation Model Chapter 10 Acceptance Sampling Chapter 14 Maintenance Chapter 18 Simulation Contents PREFACE Page v CHAPTER 1 Introduction to Operations Management Introduction Why Study Operations Management? Page vi Page vii OM IN ACTION Drone Delivery Canada Page viii Careers in Operations Management Functions Within Organizations Operations Page ix Page x Finance Marketing Other Functions Page xi Page xii The Scope of Operations Management Differentiating Production of Goods and Services The Operations Manager’s Job Operations Managers and Decision Making Models Quantitative Techniques Performance Metrics Analysis of Trade-Offs The Systems Approach Establishing Priorities Ethics The Historical Evolution of Operations Management The Industrial Revolution Scientific Management The Human Relations Movement Decision Models and Computers The Influence of Japanese Manufacturers Major Trends Page xiii Page xiv Operations Management and Supply Chain Management Summary Key Terms MINI-CASE Sobeys MINI-CASE Small Business Operations CHAPTER 2 Competitiveness, Strategic Planning, and Productivity Introduction Competitiveness Mission and Strategies Strategies and Tactics OM IN ACTION Dollarama Supply Chain Strategy Operations Strategy OM IN ACTION Canada Post and Its New Indigenous and Northern Reconiliation Strategy Strategic Operations Management Decision Areas OM IN ACTION Nike's 10 Operations Strategic Decision Areas Implications of Organization Strategy for Operations and Supply Chain Management Transforming Strategy into Action: The Balanced Scorecard Productivity Measuring Productivity Productivity Measurement of Services Factors That Affect Productivity Improving Productivity Summary Key Terms MINI-CASE Competing the Loblaw Way MINI-CASE Why Productivity Matters CHAPTER 3 Demand Forecasting Introduction OM IN ACTION Forecasting in Ocean Spray OM IN ACTION Barilla SpA Features Common to All Forecasts Elements of a Good Forecast Steps in the Forecasting Process Approaches to Forecasting Overview of Demand Forecasting by Forecasting Horizon Judgmental Methods Executive Opinions Sales Force Opinions Consumer Surveys Historical Analogies Expert Opinions Time Series Models: Introduction and Averaging Naïve Methods Averaging Methods Techniques for Trend Linear Trend Equation Nonlinear Trend Trend-Adjusted Exponential Smoothing Techniques for Seasonality Using Seasonal Relatives Computing Seasonal Relatives Techniques for Cycles Associative Models Simple Linear Regression Multiple Regression OM IN ACTION Mark’s Accuracy and Control of Forecasting Process Accuracy of the Forecasting Process Controlling the Forecasting Process OM IN ACTION New Disruptions in Demand Forecasting Choosing a Forecasting Technique Using Forecast Information Computers in Forecasting OM IN ACTION Nike Forecasting and the Supply Chain OM IN ACTION COVID-19 and Supply Chain Forecasting OM IN ACTION Canadian Vehicle Sales and Irregular Variation Patterns Summary Key Terms MINI-CASE M&L Manufacturing MINI-CASE Highline Financial Services CHAPTER 4 Product and Service Design Introduction What Does Product and Service Design Do? OM IN ACTION Steelcase and Design Thinking Key Questions for Product and Service Design Reasons for Product and Service Design Process or Redesign Product and Service Design Process Phases of Product Design and Development Phases in the Service Design Process Sources of Ideas for New or Redesigned Products and Services OM IN ACTION BlackBerry’s New Product Design Project OM IN ACTION Searching for New Product Ideas Product and Service Design Considerations Product Life Cycle Concurrent Engineering Computer-Aided Design OM IN ACTION CAD and 3D Printing Push Medical Boundaries Product Life Cycle Management (PLM) Design for Manufacturing and Assembly (DFMA) Degree of Standardization Design for Mass Customization OM IN ACTION Fast-Food Chains Adopt Mass Customization OM IN ACTION Constructing Modular Hotels in Canada Material Selection Component Commonality Degree of Newness Design for Reliability Robust Design Legal and Ethical Issues Human Factor Issues OM IN ACTION Air Taxi Services in Canada Design for Environment OM IN ACTION Roots and Its Vegan Leather Products OM IN ACTION Nestlé Waters’ Recyclable Bottle Design Quality Function Deployment OM IN ACTION A QFD Snapshot The Kano Model Failure Modes and Effects Analysis Characteristics of Service Design Challenges of Service Design Service Blueprinting Global Product and Service Design OM IN ACTION Draganfly Innovations Operations Strategy Summary Key Terms MINI-CASE McDonald's Menu in Various Countries CHAPTER 5 Strategic Capacity Planning Capacity, Measures, Efficiency, Utilization, and Effective Capacity OM IN ACTION Offshore Outsourcing in Canadian Banks OM IN ACTION Trade War The Importance of Long-Term Capacity OM IN ACTION Canadian Refineries and Their Capacity Levels Measuring Capacity and Some Related Performance Measures OM IN ACTION Airline Capacity Utilization and the COVID-19 Pandemic Factors Influencing Effective Capacity Strategic Capacity Planning Process in Organizations Forecasting Long-Term Demand Calculating Capacity Requirements OM IN ACTION Long-Term Care Capacity Planning Major Considerations for Developing Capacity Alternatives OM IN ACTION Surge Pricing at Uber Planning Service Capacity Evaluating Alternatives Break-Even Analysis Break-Even Problem With Step Fixed Cost Break-Even Point in Sales Dollars Financial Analysis OM IN ACTION Solar Power Operations Strategy Summary Key Terms MINI-CASE Packaging System Alternatives MINI-CASE Shoes for Moos CHAPTER 6 Process Design and Facility Layout Introduction Process Selection Process Types OM IN ACTION Job Shop Manufacturing at Hi-Bek Precision Spring Company OM IN ACTION Paccar Trucks Assembly Plant Comparison of Process Types Selecting a Process Type Product and Service Profiling Sustainable Production of Goods and Services Processes Lean Process Design Technology Automation OM IN ACTION Automated Steel Making at Algoma Steel OM IN ACTION Sobeys’ New Smart Cart OM IN ACTION Fast Lane Checkout Technology—My Walmart App Green Technologies OM IN ACTION Lavergne Groupe Process Design Methodology for Production Process Design Service Process Design Design of Processes with Interactions Types of Layout 1. Product Layouts 2. Process Layouts 3. Fixed-Position Layouts 4. Hybrid Layouts Methodology for Layout Design OM IN ACTION How Walmart's Layout Persuades Its Shoppers to Buy Service Layouts Assembly-Line Balancing Some Guidelines for Line Balancing Variable Task Times Treatment of Bottleneck Workstation Designing Process Layouts Measures of Effectiveness Information Requirements Minimizing Transportation Costs or Distances Closeness Ratings Computer Software Summary Key Terms MINI-CASE School Chairs MINI-CASE A Safe Hospital Room of the Future CHAPTER 7 Work/Job Design Approaches to Work/Job Design Efficiency Approach Behavioural Approach Role of Unions Role of Information and Communication Technologies Methods Analysis Motion Study OM IN ACTION UPS Working Conditions Government Regulation of the Workplace OM IN ACTION Supermarket Meat Department OM IN ACTION NexGen Ergonomics Workers’ Well-Being and a Healthy Workplace OM IN ACTION North York General Hospital’s Healthy Workplace Mental Health at Work OM IN ACTION Bell’s Mental Health at Work Time Studies Stopwatch Time Study Predetermined Time Standards Work Sampling OM IN ACTION Pace Productivity Inc. Compensation Skills/Knowledge-Based Bonus Pay OM IN ACTION Nursing Roles in Ontario Group Bonus Plans OM IN ACTION Employee Compensation at WestJet Management Compensation Recent Trends Operations Strategy Summary Key Terms MINI-CASE Earthwise Pallet Recyclers MINI-CASE Taylor's Techniques Help UPS CHAPTER 8 Global Location Planning and Analysis Importance of Location Strategic Importance of Location Decisions Objectives of Location Decisions Supply Chain Considerations Location Decision Process OM IN ACTION Amazon's State-of-the-Art Fulfillment Centre Global Locations Facilitating Factors Benefits Disadvantages Risks Managing Global Operations Factors That Affect Location Decisions Regional/Country Factors OM IN ACTION Government Incentives OM IN ACTION Starbucks Location Selection Community/Site-Related Considerations Service and REtail Locations Why Should Foreign Companies Locate in Canada? OM IN ACTION Canada’s Business Cost Competitiveness OM IN ACTION First Commercial Rocket Launch Site OM IN ACTION Ontario Automotive Corridor Evaluating Location Alternatives Locational Break-Even Analysis Transportation Method Factor Rating Centre of Gravity Method Location Analysis Software Summary Key Terms MINI-CASE Amazon.com, Inc. MINI-CASE Palliser Furniture CHAPTER 9 Quality Management and Six Sigma Introduction to and Evolution of Quality Management Evolution of Quality Management Quality Gurus Quality, Cost of Quality, and Total Quality Management Defining Quality: Dimensions of Quality Assessing Service Quality The Determinants of Quality Responsibility for Quality OM IN ACTION Seven Customer Service Lessons From Amazon CEO Jeff Bezos Benefits of Good Quality Cost of Quality Ethics and Quality Management Total Quality Management OM IN ACTION Medical Bar Codes Problem Solving, Process Improvement, and Quality Tools The Plan-Do-Study-Act Cycle OM IN ACTION Royal University Hospital Emergency Department Quality Tools Methods for Generating Ideas and Problem Solving Taguchi Quality Loss Function Benchmarking OM IN ACTION Benchmarking the Student Residence Application Process at Carleton University Quality Control Circle Six Sigma Quality Sigma Level Calculation and DPMO Analysis Six Sigma Improvement Methodology Quality and the Supply Chain OM IN ACTION How to Ensure Quality Across the Supply Chain Quality Awards Canada Awards for Excellence The Malcolm Baldrige Award The European Quality Award The Deming Prize Quality Certificates ISO 9000, ISO 14000, and ISO 24700 OM IN ACTION ERCO Worldwide Hazard Analysis Critical Control Point (HACCP) Operations Strategy Summary Key Terms MINI-CASE Chick-n-Gravy Dinner Line MINI-CASE Tip Top Markets CHAPTER 10 Statistical Quality Control Introduction to Statistical Quality Control Statistical Process Control Planning Process OM IN ACTION Compliance and Enforcement Policy for the Cannabis Act OM IN ACTION Nestlé Waters OM IN ACTION Falsified Reports Statistical Process Control Types of Variations Sampling and Sampling Distributions The Control Process Control Charts Control Charts for Variables Control Charts for Attributes Managerial Considerations Concerning Control Charts Run Tests Using Control Charts and Run Tests Together What Happens When a Process Exhibits Possible Nonrandom Variation? Process Capability Capability Analysis Cp Cpk Six Sigma Quality Design of Experiments OM IN ACTION Pepsi's Lean Six Sigma Program Operations Strategy Summary Key Terms MINI-CASE Tiger Tools MINI-CASE Cereal Manufacturer CHAPTER 11 Inventory Management Introduction to Inventory The Nature and Importance of Inventories Types of Inventory Functions (Purposes) of Inventory The Essential Elements of Inventory Management Inventory Control Systems OM IN ACTION SYSPRO and Its Inventory Management Software OM IN ACTION Applications of Drones in Inventory Management Inventory Tracking Tools OM IN ACTION Dairy Cattle Traceability—Animal Identification Demand Forecasting and Lead Time Information Inventory Costs OM IN ACTION AI Technology Helps Prevent In-Store Shoplifting The A-B-C Classification OM IN ACTION A-B-C Analysis at Walmart Measures of Inventory Performance Product Availability Inventory Turnover Days of Inventory How Much to Order: Economic Order Quantity Models Basic Economic Order Quantity (EOQ) Economic Production Quantity (EPQ) EOQ with Quantity Discount EOQ with Planned Shortage Reorder Point Ordering OM IN ACTION Logi-D’s 2Bin-ID ROP Using Lead Time Service Level How Much to Order: Fixed-Order-Interval Model Reasons for Using the Fixed-Order-Interval Model Determining the Amount to Order Benefits and Disadvantages of the Fixed-Order-Interval Model Determining the Order Interval Coordinated Periodic Review Model The Single Period Model Continuous Stocking Levels Discrete Stocking Levels Summary Key Terms MINI-CASE Health Care Appliances Company MINI-CASE Cameco Promotional Items CHAPTER 12 Aggregate Operations Planning and Master Scheduling Introduction to Planning Sales and Operations Planning OM IN ACTION S&OP and Spikes in Demand Aggregate Operations Planning Basic Strategies for Meeting Uneven Demand Choosing a Strategy OM IN ACTION Lands’ End OM IN ACTION Three Cases of Aggregate Production Plans Techniques for Aggregate Production Planning Trial-and-Error Optimization (Mathematical Techniques) Aggregate Services Planning OM IN ACTION Post-COVID-19 Demand Uncertainty in Aviation OM IN ACTION Robots in Nursing Homes Master Production Scheduling OM IN ACTION Inventory Backlog at Tupperware Mastering Scheduling Inputs Mastering Scheduling Outputs Stabilizing the MPS Summary Key Terms MINI-CASE Eight Glasses a Day (EGAD) MINI-CASE Scotsburn Dairy CHAPTER 13 MRP, DRP, and ERP Introduction Dependent Demand An Overview of MRP MRP Inputs The Master Production Schedule The Bills of Materials OM IN ACTION SYSPRO The Inventory Records MRP Processing Updating the System MRP Outputs Primary Reports Secondary Reports Other Considerations Safety Time Lot Sizing MRP in Services OM IN ACTION Kitchen Partners Special Types of BOMs OM IN ACTION Aqua Lung Benefits and Requirements of MRP Benefits Requirements Distribution Requirements Planning (DRP) Capacity Requirements Planning Manufacturing Resources Planning (MRP II) Enterprise Resource Planning (ERP) ERP Definition and Solutions OM IN ACTION Improving Home Health Care Supply Chains in Ontario OM IN ACTION Some SYSPRO Applications Operations Strategy Summary Key Terms MINI-CASE Promotional Novelties MINI-CASE DMD Enterprises CHAPTER 14 Just-in-Time and Lean Production Introduction Characteristics of Lean Systems The Toyota Approach Supporting Goals Elimination of Disruptions System Flexibility Elimination of Waste Product Design Process Design Small Lot Sizes Setup Time Reduction OM IN ACTION SMED in Service OM IN ACTION Implementation of SMED in General Mills Company Cellular Layout Quality Improvement Standardized Processes Production Flexibility Little Inventory Storage A Balanced System Personnel/Organization Workers as Assets Cross-Trained Workers Continuous Improvement (Kaizen) Leadership Non-manufacturing Support Planning and Control Level Loading Pull System and Kanban OM IN ACTION Waterville TG Close Supplier Relationship Preventive Maintenance and Housekeeping Lean Tools Value Stream Mapping OM IN ACTION Canada Post’s Calgary Plant Process Improvement Using 5W2H Lean and Six Sigma Lean and ERP Transitioning to a JIT/Lean System Planning a Successful Conversion Obstacles to Conversion A Cooperative Spirit Lean Services Benefits and Risks of JIT/Lean Systems World Class Manufacturing Operations Strategy Summary Key Terms MINI-CASE Level Operations CHAPTER 15 Supply Chain Management and Logistics Introduction to Supply Chain Management Key Aspects of Supply Chain Management OM IN ACTION Walmart Focuses on Its Supply Chain Small Businesses and Managing the Supply Chain Supply Chain Management Activities and Responsibilities Strategic Activities and Responsibilities Key Tactical (Planning)/Operational Responsibilities Trends in Supply Chain Management OM IN ACTION Supply Chain Transparency OM IN ACTION Self-Driving Vehicles on the Horizon Global Supply Chains Procurement Purchasing's Interface Make-or-Buy and Insourcing–Outsourcing Decisions OM IN ACTION Improving Quality and Reducing Risk in Offshoring Purchasing Cycle Centralized versus Decentralized Purchasing Value Analysis Determining Prices Spend Analysis Ethics in Purchasing E-Business Supplier Management Choosing Suppliers Supplier Relationship Supplier Partnership Supplier Certification Importing Logistics Types of Party Logistics Transportation Transportation Modes OM IN ACTION UPS Sets the Pace for Deliveries and Safe Driving OM IN ACTION Air Freight by Drones Transport Planning Transport Execution and Control Warehousing Warehouses/Distribution Centres Warehousing Benefits OM IN ACTION Canadian Tire Automated Distribution Centre Warehousing Activities OM IN ACTION Smart Glasses in Warehousing Types of Warehouse Layout Flow Warehouse Slotting Order Picking Methods Warehouse Performance Measurement Warehouse Management System (WMS) OM IN ACTION Sobeys's High-Tech Distribution Centres Inventory Management in the Supply Chain Location of Inventories Inventory Velocity The Bullwhip Effect Reducing the Need for Inventory Efficient Replenishment Methods Multi-Echelon Inventory Management OM IN ACTION Procter & Gamble Order Fulfillment Supply Chain Management Information System ERP and Supply Chain Management Electronic Data Interchange Radio Frequency Identification OM IN ACTION Active RFID versus Passive RFID OM IN ACTION RFID Tags: Keeping the Shelves Stocked Blockchain Technology OM IN ACTION Nestlé Is Using Blackchain for Procurement Transparency Risk Management and Resilience in the Supply Chain Risk of Supplier Disruption Ethics and the Supply Chain Creating an Effective Supply Chain Challenges Making the Supply Chain More Efficient Summary Key Terms MINI-CASE Summerwood MINI-CASE MasterTag CHAPTER 16 Job and Staff Scheduling Introduction Loading Load Gantt Chart Dealing with Infinite Loading OM IN ACTION Netronic Software Assignment Model OM IN ACTION Boarding an Airplane Sequencing Priority Rules and Performance Measures Sequencing Jobs Through Two Work Centres/Machines Sequencing Jobs with Sequence-Dependent Setup Times Sequencing Jobs Through One Work Centre/Machineto Minimize Number of Late Jobs Sequencing Jobs Through Three or More Work Centres/Machines to Minimize Make-Span Shop-Floor Control OM IN ACTION Mattec MES Schedule Gantt Chart Input/Output Control Difficulty of Scheduling and Using the Bottleneck Operation Why Scheduling Can Be Difficult Theory of Constraints Staff Scheduling OM IN ACTION Metro Vancouver Transit Police Scheduling Cyclical Scheduling Shift Scheduling OM IN ACTION ESP by ThoughtWorks Inc. OM IN ACTION Employee Scheduling in Hard Rock Cafe Scheduling Multiple Resources OM IN ACTION Edmonton Transit Service Summary Key Terms MINI-CASE Hi-Ho, Yo-Yo, Inc. MINI-CASE Scotsburn Dairy—Operational Sequencing CHAPTER 17 Project Management Introduction to Project Management OM IN ACTION Top 10 Major Infrastructure Projects in Canada The Nature of Projects OM IN ACTION Canada's Largest Solar Project in Alberta Project Manager Responsibilities Project Planning OM IN ACTION Artificial Intelligence Will Help Project Managers Work Breakdown Structure Introduction to Project Scheduling Gantt Chart PERT/CPM The Network Diagram Scheduling Using Deterministic Durations PERT/CPM Solution Technique Probabilistic Durations Determining Path Probabilities Budget Control Risk Management Planning Project Crashing Project Execution and Control OM IN ACTION New Champlain Bridge Other Topics in Project Management Project Management Software Operations Strategy Summary Key Terms MINI-CASE Time, Please MINI-CASE Fantasy Products CHAPTER 18 Waiting-Line Analysis Introduction Why Is There Waiting? OM IN ACTION Traffic at Canadian Tire Goal of Waiting-Line Analysis Psychology of Waiting OM IN ACTION Disney Genie and Genie+ OM IN ACTION Managing Waiting Lines at Disney World Constraint Management Queueing System Characteristics and Performance Measures Potential Number of Customers Number of Servers and Structure of Queueing System Arrival and Service Patterns Queue Discipline (Order of Service) Performance Measures OM IN ACTION Queueing Theory and Health Care Operations Queueing Models: Infinite Source Basic Relationships Single Server Models Model 1: Single Server, Exponential Service Durations Model 2: Single Server, Exponential Service Durations, Finite Number in System Model 3: Single Server, Constant Service Durations Model 4: Single Server, General Service Durations Multiple Server Models Model 5: Multiple Servers, Exponential Service Durations Model 6: Multiple Servers, Exponential Service Durations, Finite Number in System Model 7: Multiple Servers, General Interarrival and Service Durations Model 8: Multiple Servers with Priority, Exponential Service Durations Queueing Model: Finite Source Operations Strategy Summary Key Terms MINI-CASE Big Bank MINI-CASE Peace Arch Border Crossing Appendix A: Appendix B: Appendix C: Answers to Selected Problems Tables Working With the Normal Distribution Endnotes Index Chapter Supplements Available on Connect Chapter 4S Reliability Chapter 5S Decision Analysis Chapter 6S Linear Programming Chapter 7S Learning Curves Chapter 8S The Transportation Model Chapter 10S Acceptance Sampling Chapter 15S Maintenance Chapter 18S Simulation Preface Operations & Supply Change Management, Eighth Canadian Edition, was written for students Page xv and faculty teaching the fascinating and ever-changing world of operations management and supply chain management in Canada. The importance of supply chain and operations management has never been more apparent than during the COVID-19 crisis—from restocking toilet paper all the way to distributing the vaccine worldwide. The Eighth Canadian Edition continues to offer a comprehensive and flexible amount of content appropriate for different courses and formats, including undergraduate, graduate, and executive education. While the chapters in the text are connected, and certainly build upon themselves, they can still be selected and presented in the order that is most relevant for the instructor. That flexibility also extends to the choice of relative weighting of the qualitative and quantitative aspects of the material and the order in which chapters are covered, because chapters do not depend on sequence. For example, some instructors cover project management early, while others cover quality or JIT/lean early. The topics covered include both strategic issues and planning/control decisions. Activities such as capacity, designing production process and work methods, inventory management and control, and assuring and improving quality are core issues in organizations. Whether operations is your field of study or not, knowledge of operations management will certainly benefit you and the organization you work for. The advantages of using a Canadian resource for your operations management learning are numerous, including: Canadian locations and companies are showcased Examples of Canadian organizations and their decisions are highlighted Issues important for Canadian instructors and reviewers are addressed International examples are framed and reflected from a Canadian perspective There is a focus on Canadian data for context What’s New in the Eighth Canadian Edition? The Eighth Canadian Edition has had an extensive revision. The authors worked very hard to sequence the material in a way that will support student learning and understanding. In the new edition, readers will find many new opening cases, new OM in Action feature boxes, and many new and revised examples, figures and images. For an in-depth look at the updates to the new edition, please see below for the chapter-by-chapter changes. Page xvi Page xvii Chapter 1 Title Introduction to Operations Management Important Changes/Additions Updated introductory material and summary Updated figures and examples New section on operations management and supply chain management Updated statistics Updated list of related associations New Mini-Case on small business operations and updated Sobeys Mini-Case 2 Competitiveness, Strategic Planning, New sections on circular supply chain, why some and Productivity organizations fail, strategy formulation, operations strategy, strategic operations management decision areas, and implications of organization strategy for operations and supply chain management Revised sections on supply chain strategy and timebased strategy New figures, key terms, and problems New Mini-Case: Why Productivity Matters New and revised chapter opener on IKEA's circular supply chain New OM in Action boxes New learning objectives 3 Demand Forecasting Updated statistics and figures Updated, revised, or added content in the introduction as well as sections on judgmental methods, time series models, seasonality, associative models, and forecasting accuracy Updated examples New and revised OM in Action boxes New figures, key terms, and problems New learning objective New Mini-Cases Chapter 4 Title Product and Service Design Important Changes/Additions New sections on design for reliability, series and parallel designs, product life cycle management (PLM), the three Rs (reduce, reuse, and recycle), end-of-life programs, key questions for product and service design, reasons for product and service design or redesign, product and service design considerations, degree of newness, human factor issues, characteristics of service design, operations strategy, and chapter supplement New OM in Action boxes New chapter opener on 3D-printed houses in British Columbia New examples, key terms, figures, summary, solved problems, discussion questions, and problems New Mini-Case New learning objectives 5 Strategic Capacity Planning New chapter opener content New figures Revised sections on capacity management, strategic capacity planning, and break-even analysis Updated examples, key terms, and problems Revised tables New and revised OM in Action boxes New learning objectives New Mini-Case 6 Process Design and Facility Layout New sections on process selection, product and service profiling, sustainable production of goods and services, lean process design, drones, applications of 3D printing, and chapter supplement Revised sections in the introduction, comparison of process types, product layouts, the example of minimizing transportation costs or distances, summary, and chapter supplement New learning objectives New figures, examples, and key terms New OM in Action boxes Chapter 7 Title Work/Job Design Important Changes/Additions Revised, updated, or added new content in sections on work/job design, methods analysis (new part on motion study), working conditions (work hours, safety standards, and mental health), time studies, and compensation Revised and updated examples, figures, key terms, and problems New and revised OM in Action boxes New Mini-Case New learning objectives 8 Global Location Planning and Analysis New chapter opener content New subsections on strategic importance of location decisions, objectives of location decisions, supply chain considerations in location decisions, and location options New section on global locations Revised, updated, or added content in sections on factors that affect location decisions and location alternatives Revised figures and problems New and revised OM in Action boxes New Mini-Case 9 Quality Management and Six Sigma New sections on Six Sigma quality and DPMO, quality and the supply chain, assessing service quality, responsibility for quality, the consequences of poor quality, operations strategy quality, obstacles to implementing TQM, criticisms of TQM, and operations strategy Revised sections on evolution of quality management, quality gurus, and summary New learning objectives New chapter opener on quality at A&W New figures, examples, solved problems, problems discussion questions, and key terms New OM in Action boxes 10 Statistical Quality Control Revised chapter opener Revised, updated, or added content in the introduction, statistical quality control, statistical process control, and Chapter Title Important Changes/Additions process capability New subsections on the control process, improving process capability, and limitations of capability indexes Revised problems New learning objectives New Mini-Case 11 Inventory Management New sections on measures of inventory performance, product availability, inventory turnover, days of inventory, the nature and importance of inventories, and functions (purposes) of inventory Revised summary New chapter opener on inventory management at Walmart New learning objectives New examples, key terms, figures, solved problem, problems, and discussion questions New OM in Action boxes 12 Aggregate Operations Planning and Master Scheduling New chapter opener Revised, updated, or added content in the introduction, planning, techniques for aggregate production planning, aggregate service planning, and master production scheduling New section on basic strategies for meeting uneven demand Revised figures, key terms, and problems New and revised OM in Action boxes New Mini-Case 13 MRP, DRP, and ERP New sections on distribution resource planning (DRP) with new examples, benefits and requirements of MRP, the inventory records, and operations strategy Revised sections on manufacturing resources planning (MRP II), other considerations in MRP, and the summary New chapter opener on implementing MRP at OS&B company New learning objectives Chapter Title Important Changes/Additions New Mini-Cases New examples, key terms, figures, tables, solved problems, problems, and discussion questions New OM in Action boxes 14 Just-in-Time and Lean Production New sections on Gemba walk, benefits and risks of JIT/lean systems, characteristics of lean systems, the Toyota approach, limited work-in-process (WIP), and reduced transaction processing Revised section on small lot sizes, little inventory storage, Andon, poka-yoke, continuous improvement (Kaizen), planning a successful conversion, summary, and chapter supplement New chapter opener on Zara and lean production New examples, key terms, and discussion questions New learning objectives New OM in Action boxes 15 Supply Chain Management and New sections on types of party logistics (PL), types of Logistics warehouse layout flow, warehouse performance measurement with examples, risk management and resiliency with examples, key aspects of supply chain management, and creating an effective supply chain Revised chapter opener (Ocado) and introduction, and revised sections on supplier management and partnership, e-business, A-B-C warehouse slotting, inventory velocity, blockchain technology, and summary New learning objectives New examples, key terms, figures, tables, problems, and discussion questions New OM in Action boxes 16 Job and Staff Scheduling Revised chapter opener Revised, updated, or added content in the introduction, staff scheduling, loading, sequencing, shop-floor control, difficulty of scheduling, and staff scheduling New subsection on scheduling multiple resources Chapter Title Important Changes/Additions Revised examples, tables, and problems New learning objectives New and revised OM in Action boxes 17 Project Management New sections on the pros and cons of working on projects, budget control, Six Sigma projects, virtual project teams, managing multiple projects, potential sources of error in project scheduling techniques, and operations strategy Revised introduction, key decisions in project management, project manager responsibilities, work breakdown structure, project management software, and summary New learning objectives New key terms and figures New OM in Action boxes 18 Waiting-Line Analysis Updated and revised the chapter opener Updated, revised, or added content in the introduction, waiting-line analysis, infinite source models, and multiple server models Revised figures, and examples New learning objectives New and revised OM in Action boxes Page xviii Important Features Page xix Balanced Content. The text strives to achieve a careful balance in the presentation of operations management. Care has been taken to balance definitions and concepts with quantitative, hands-on problems; to balance theoretical material with real-life applications; and to balance classical topics in operations management with new developments that particularly interest students. Problem-Solving Approach. To further students’ hands-on experience of OM, the text contains examples with solutions throughout. At the end of most chapters is a group of solved problems to illustrate concepts and techniques. Some of the end-of-chapter problems have answers at the end of the book. Easy to Read. The writing style is clear, concise, and student friendly, while maintaining the technical rigour necessary for the subject matter. From step-by-step problem solving to theoretical exposition, to indepth Mini-Cases and readings, the book is designed to promote student understanding of the role of operations management in successful organizations—which, in turn, promotes student success in class. Reflecting the Diverse World Around Us McGraw Hill believes in unlocking the potential of every learner at every stage of life. To accomplish that, we are dedicated to creating products that reflect, and are accessible to, all the diverse, global customers we serve. Within McGraw Hill, we foster a culture of belonging, and we work with partners who share our commitment to equity, inclusion, and diversity in all forms. For McGraw Hill Canada, this includes, but is not limited to, the following: Refreshing and implementing inclusive content guidelines around topics including generalizations and stereotypes, gender, abilities/disabilities, race/ethnicity, sexual orientation, diversity of names, and age. Enhancing best practices in assessment creation to eliminate cultural, cognitive, and affective bias. Maintaining and continually updating a robust photo library of diverse images that reflect our student populations. Including more diverse voices in the development and review of our content. Strengthening art guidelines to improve accessibility by ensuring meaningful text and images are distinguishable and perceivable by users with limited colour vision and moderately low vision. Pedagogy and Learning Tools A number of key features in this text have been specifically designed to help introductory students learn, understand, and apply operations concepts and problem-solving techniques. All of these have been carefully developed over the previous six Canadian editions and 13 U.S. editions and have proven successful. Learning Objectives. Every chapter lists the learning objectives as a short guide to studying the chapter. These objectives are linked to each section and to the questions and problems at the end of the chapter. Opening Vignettes. Every chapter has an opening vignette (chapter opener) that illustrates the importance of the topic, usually highlighting a company. Figures and Photos. The Eighth Canadian Edition includes extensive photographs and graphic illustrations to support student study and provide interest and motivation for all types of learners. Page xx OM in Action. Throughout the new edition are readings about applications of OM. These OM in Action boxes highlight important real-world applications, provide examples of operations issues, and/or offer further elaboration of the content. They also provide a basis for classroom discussion and generate interest in the subject matter. Examples with Solutions. Throughout the new edition, wherever a quantitative technique is introduced, an example is included to illustrate the application of that technique. These are designed to be easy to follow. Page xxi Excel Icons. Excel icons have been added to the examples and questions for which the Excel templates are available on Connect. End-of-Chapter Resources For student study and review, the following items are provided at the end of each chapter. Summary. An overview of the material covered is given in point form. Key Terms. Key terms are highlighted in the text. Solved Problems. At the end of most chapters, solved problems illustrate problem solving and the core concepts of the chapter. These have been carefully prepared to enhance student understanding, as well as to provide additional examples of problem solving. Excel Spreadsheet Solutions. Where applicable, the solved problems include screen shots of a spreadsheet solution. These are taken from the Excel templates, which can be found on Connect. Discussion and Review Questions. These are intended to serve as a student self-review or as class discussion starters. Taking Stock and Critical Thinking Exercises. These activities encourage analytical thinking and help broaden conceptual understanding. Page xxii Problems. Most chapters have numerous problems, ranging from simple practice problems that apply techniques to more difficult conceptual problems that provide a challenge and require students to integrate concepts (these are marked with an asterisk). Mini-Cases. Many chapters include short cases selected to provide a broader, more integrated thinking opportunity for students. Superior Learning Solutions and Support Page xxiii The McGraw Hill team is ready to help you assess and integrate any of our products, technology, and services into your course for optimal teaching and learning performance. Whether it’s helping your students improve their grades, or putting your entire course online, the McGraw Hill team is here to help you do it. Contact your learning solutions consultant today to learn how to maximize all of McGraw Hill's resources! We would like to thank the McGraw Hill team, including the portfolio manager, Amy Clarke-Spencley; content developer, Stephanie Schwartz; supervising editor, Janie Deneau; permissions editor, Steve Rouben (Photo Affairs); and copy editor, Leanne Rancourt, for their excellent work and support. Hydeh Mottaghi Behrouz Bakhtiari Award-Winning Technology Page xxiv McGraw Hill Connect® is our best-in-class digital teaching and learning solution that saves time and enhances your impact. Connect gives you the tools you need to deliver a personalized course with ease, backed by our support at every step of the way so you can open a world of possibilities for your students. SmartBook® personalizes learning to individual student needs, continually adapting to pinpoint knowledge gaps and focus learning on concepts requiring additional study. For instructors, SmartBook tracks student progress and provides insights that guide teaching strategies and advanced instruction, for a more dynamic class experience. Connect’s key features also include analytics and reporting, assignment management, smart grading, the opportunity to post your own resources, and the Connect Instructor Library, a repository for additional resources to improve student engagement in and out of the classroom. Instructor Resources for Operations Management, Eightn Canadian Edition Instructor’s Solutions Manual Test Bank Application-Based Activities Microsoft® PowerPoint® Presentations Practice Operations Instructor Manual Test Builder Available within Connect, Test Builder is a cloud-based tool that enables instructors to format tests that can be printed or administered within a learning management system. Test Builder offers a modern, streamlined interface for easy content configuration that matches course needs, without requiring a download. Test Builder allows you to: access all test bank content from a particular title easily pinpoint the most relevant content through robust filtering options manipulate the order of questions or scramble questions and/or answers pin questions to a specific location within a test choose the layout and spacing add instructions and configure default settings Test Builder provides a secure interface for better protection of content and allows for just-in-time updates to flow directly into assessments. Application-Based Activities The Connect Application-Based Activities (ABAs) are highly interactive, automatically graded minisimulations that emphasize both Quantitative and Qualitative aspects of Operations and Supply Chain Management. These activities encompass a mix of Static and Algorithmic formats, offering students a comprehensive learning experience. Within these exercises, students immerse themselves in real-world operations and supply chain management scenarios, applying their OM and SCM knowledge. From learning fundamental principles like capacity planning to addressing complex field challenges, the ABAs aim to cultivate critical thinking and problem-solving skills, preparing students for success in the dynamic realm of Operations & Supply Chain Management. Practice Operations Practice Operations is a learning resource that brings operations management to life while Page xxv reinforcing key concepts in a way that promotes critical thinking and strategic decision making. Practice Operations is a 3D, interactive, game-based simulation that allows students to manage operations of a manufacturing and distribution company. Players assume the role of an operations manager in a company that manufactures clothing products for clients. Players are in charge of placing bids for contracts, managing physical and human resources, ordering raw materials, turning them into refined clothing, and shipping the final products to the client. The game is set up in a number of focused modules that deal with the issues of the production process, capacity, supply chain, JIT, labour management, order fulfillment, customer satisfaction, and quality control. End-of-Chapter Problems Connect for Operations Management provides assignable, gradable end-of-chapter content to help students learn how to solve problems and apply concepts. Advanced algorithms allow students to practise problems multiple times to ensure full comprehension of each problem. Integrated Excel The power of Microsoft Excel meets the power of Connect in our Integrated Excel assignments. In this new assignment type, Excel opens seamlessly inside Connect, with no need for uploading or downloading any additional files or software. Instructors choose their preferred auto-graded solution, with the option for either grading for formula accuracy or for the solution value. Excel Templates Excel Templates are available in Connect for select exhibits and various end-of-chapter problems that have been set as Excel spreadsheets. They correlate with specific concepts in the text and allow students to work through problems and gain experience using spreadsheets. Writing Assignments The Writing Assignment tool delivers a learning experience to help students improve their written communication skills and conceptual understanding. As an instructor, you can assign, monitor, grade, and provide feedback on writing more efficiently and effectively. ReadAnywhere App Read or study when it’s convenient with McGraw Hill’s free ReadAnywhere® app. Available for iOS and Android smartphones or tablets, ReadAnywhere gives users access to McGraw Hill tools including the eBook and SmartBook® or Adaptive Learning Assignments in McGraw Hill Connect®. Students can take notes, highlight, and complete assignments offline—all their work will sync when connected to Wi-Fi. Students log in with their Connect username and password to start learning—anytime, anywhere! Polling Uncover where and when you’re needed with the new Polling tool in McGraw Hill Connect®! Polling allows instructors to discover where students are in real time. Engage students and help them create connections with course content while gaining valuable insight during lectures. Leverage polling data to deliver personalized instruction when and where it is needed most. Adaptive Learning Assignments Adaptive reading, grammar, writing, and research assignments develop and improve students’ foundational writing skills with a series of adaptive questions that provides immediate and personalized feedback through interactive learning resources. Page xxvi Remote Proctoring and Browser-Locking Capabilities New remote proctoring and browser-locking capabilities, hosted by Proctorio within Connect, provide control of the assessment environment by enabling security options and verifying the identity of the student. Seamlessly integrated within Connect, these services allow instructors to control students’ assessment experience by restricting browser activity, recording students’ activity, and verifying that students are doing their own work. Instant and detailed reporting gives instructors an at-a-glance view of potential academic integrity concerns, thereby avoiding personal bias and supporting evidence-based claims. McGraw Hill & Online Learning Consortium Partnership The Online Learning Consortium (OLC) is a higher education community dedicated to advancing quality digital teaching and learning experiences. McGraw Hill has partnered with the OLC to create a Quality in Online Learning Certification for our implementation team and Digital Faculty Consultants (DFCs). This certification teaches McGraw Hill Digital Success Consultants and DFCs researchbacked best practices on how to build, facilitate and assess online courses. Page xxvii McGraw Hill Connect is a best-in-class digital teaching and learning solution that empowers students to reach their potential and enables instructors to manage their course more efficiently. Endorsed by educators. Loved by students. Instructors Deliver your course Enhance your teaching style with course management tools that save you time like seamless LMS integration, mobile access to the digital textbook, assignment creation tools and more. Our trusted, high-quality course materials help students develop higher-level thinking skills while allowing you the flexibility to tailor your course. Drive student success Incorporate adaptive study resources like SmartBook into your course and help your students be better prepared in less time. Monitor student progress with critical analytics, data and insights to help guide your teaching and remediation for better outcomes. Support at every step We’ll partner with you to ensure success every step of the way. From course design and setup to instructor training, LMS integration and ongoing support, your Digital Success Consultant is here to make your course as effective as possible. Students Your ideal study partner Connect is designed to make you more productive with simple, flexible tools that maximize your study time. With everything you need in one place, Connect makes it easy to read your eBook, complete assignments and stay on track. Study anytime, anywhere Download the ReadAnywhere app to access your eBook or SmartBook assignments on the go, online or offline. The app automatically syncs with Connect to ensure you’re always up to date. Learning for everyone McGraw Hill works directly with your institution’s Accessibility Office to meet the learning needs of all students. Reach out to your Accessibility Office or visit www.m heducation.ca/accessibility to learn more. Learn more about Connect at www.mheducation.ca/connect » Page xxviii CHAPTER 1 Introduction to Operations Management Page 1 michaeljung/Shutterstock Lars Hagberg/Alamy Stock Photo Radius/SuperStock LEARNING OBJECTIVES After completing this chapter, you should be able to: LO1 LO2 LO3 LO4 LO5 LO6 LO7 LO8 LO9 Define the term operations management and identify operations management jobs. Identify the three major functions of organizations and describe how they interact. Describe the scope of operations management and provide an overview of this textbook, including differentiating between design and planning/control decisions. Compare production of goods and services. Discuss the operations manager’s job. Describe the key aspects of operations management decision making. Briefly describe the historical evolution of operations management. Identify the major trends that affect operations management. Describe the role of supply chain management in operations management. Recalls of automobiles, foods, toys, and other products; major oil spills; and even dysfunctional government legislatures are all examples of operations failures. They underscore the need for effective operations management. Examples of operations successes include the production and delivery of the many electronic devices we all use, medical breakthroughs in diagnosing and treating ailments, high-quality goods and services that are widely available, and so on. Operations are what businesses do. Operations are processes that either provide services or create goods or both. Operations take place in businesses ranging from retail stores, restaurants, and supermarkets, to production facilities, banks, and hospitals. In fact, they take place in every business organization. Moreover, operations are the core of what a business organization does. As you read this book, you will learn about managing those operations. The subject matter is relevant for you regardless of your major. Productivity, quality, ebusiness, competition, and customer satisfaction are important for every aspect of a business organization. This first chapter presents an introduction and overview of operations management. Among the issues it addresses are: What is operations management? Why is it important? What do operations management professionals do? The chapter also provides a description of the historical evolution of operations management and a discussion of the trends and issues that impact operations management. 1.1 Introduction Page 2 LO1 Define the term operations management and identify operations management jobs. Operations management is the management of processes that create goods and/or provide services. A process is a sequence of activities, usually performed by more than one person, which uses resources and achieves a desired result. A good is a tangible item, whereas a service is an act or work for someone (a customer or client). Let’s use an airline to illustrate the processes involved in its operations. The resources include staff, aircraft, airports, and maintenance facilities. The processes can be classified as core, support, and managerial: Core processes include taking customer reservations, communicating with customers, checking and boarding, in-flight service, and baggage handling. Support processes include employee recruitment and training, buying and maintaining aircraft, and buying fuel and spare parts. Managerial processes include forecasting travel demand, capacity and flight planning, locating maintenance facilities, scheduling planes/pilots/crew and counter staff/baggage handlers, managing inventories, and ensuring that quality standards are met. Most of the managerial processes fall into the realm of operations management. Now let’s consider a bicycle manufacturing facility: Core processes include buying raw materials (tubes, etc.) and parts (gears, chains, tires, etc.), fabrication (forming and welding the frame, etc.), and assembly. Support processes include recruiting and training workers, and purchasing and maintaining equipment. Managerial processes include deciding on the style of bicycle (product design), deciding which components to make and which to buy, forecasting demand, scheduling production, and ensuring that quality standards are met. Cycles Devinci is a Canadian manufacturer of bicycles, founded in Chicoutimi, Quebec, in 1987. In addition to a full line of road, mountain, and hybrid bicycles, Devinci also manufactures the Bixi brand of bicycles used in bike sharing programs in cities such as Montreal and Toronto. Jetta Productions/Blend Images Obviously, an airline and a bicycle factory are completely different. One is a service provider, the other a producer of goods. Nonetheless, these two companies have many support and managerial processes in common. Both involve buying and managing equipment and supplies, recruiting and training employees, forecasting demand, scheduling activities, and satisfying quality standards. Many companies use operations management strategies, tactics, and actions in order to improve their efficiency and effectiveness. Efficiency measures the amount of resources (e.g., time, cost, etc.) used to produce one unit of output. It is also customary to use “efficiency” to refer to the state of minimizing resources used to achieve one unit of output. If the resources used to produce one unit of output in a process are reduced, the process is said to have improved its efficiency. Effectiveness measures the extent to which an operation is achieving the intended goals (quality and timeliness). This textbook contains many practical and real-life examples of operations management in the form of chapter openers, photos with captions, readings in the form of OM in Action boxes, mini-cases and problems. For example, the chapter openers are: IKEA’s strategy ( Aircraft forecasting ( Chapter 3), 3D printing ( Ford’s factory changeover ( Chapter 4), capacity planning ( Chapter 5), Chapter 6), GE Aviation’s participative management ( Chapter 7), Volkswagen’s new facility in Ontario ( Bicycle’s quality control ( Chapter 8), A&W quality management ( Chapter 10), Walmart’s inventory management ( Temporary Foreign Worker program ( requirements planning ( Chapter 2), Bombardier Business Chapter 11), Canada’s Chapter 12), Oakville Stamping & Bending Limited’s material Chapter 13), Zara’s lean practices ( management in online grocery retailing ( Chapter 14), supply chain Chapter 15), healthcare job and staff scheduling ( Chapter 16), Billy Bishop Toronto City Airport’s project management ( crossing waiting line management ( Chapter 9), Trek Chapter 18). Chapter 17), and border Page 3 Why Study Operations Management? There are a number of reasons to study operations management. First, because a large percentage of a company’s expenses occur in the operations area (e.g., purchasing materials, paying workforce salaries), more efficient operations can result in large increases in profit. Second, many management positions in companies are operations management positions. This includes positions in forecasting, logistics and supply chain management, purchasing, quality assurance, production planning and control, scheduling, inventory management, and more. Third, activities in all the other areas of organizations—such as finance, accounting, human resources, management information systems, and marketing—are all interrelated with operations management activities. So, it is essential for people who work in these areas to have a basic understanding of operations management. Fourth, operations innovations lead to marketplace and strategic benefits. Examples include Toyota Production System, Dell’s direct shipping of personal computers, Zara’s fast and responsive supply chain, and Walmart’s cross-docking (goods received from suppliers at a distribution centre are transferred to outbound trucks to retail stores without being stored).1 For an example of operational innovation, see the “ Drone Delivery Canada” OM in Action. OM in ACTION Drone Delivery CanadaA Drone Delivery Canada Corp. is a drone technology company focused on the design, development, and implementation of its proprietary logistics software platform, using drones. The company’s platform will be used as a software as a service (SaaS) model for government and corporate organizations globally. According to news published in March and April 2020, in light of developments related to the coronavirus disease (COVID-19) pandemic, the Vaughan-based company started reviewing drone-related regulations with the federal government. The company hopes to investigate procedures that would ensure quick access to medical supplies by remote communities. Drone deliveries could prove especially useful in transporting blood samples to laboratories when there is a need for limited person-to-person contact. In 2017, the company partnered with Moose Cree First Nation to initiate the delivery of mail, food, and medical goods to its remote communities using drones. Moose Cree is located on an island in the middle of Moose River in northern Ontario. Crossing the river by boat or ice road is not always possible and transportation by helicopter is very expensive. As a result, drone deliveries could prove to be a successful and efficient mode of transportation for the community. Careers in Operations Management If you are thinking of a career in operations management, you can obtain relevant information from one or more of the following associations: Supply Chain Canada Canada’s Logistics Association (CITT) Association for Supply Chain Management (ASCM) Institute for Operations Research and Management Sciences (INFORMS) Institute for Supply Management (ISM) American Society for Quality (ASQ) Project Management Institute (PMI) Most of these associations offer certification programs and a job bank. 1.2 Functions Within Organizations Page 4 LO2 Identify the three major functions of organizations and describe how they interact. Organizations are formed to pursue goals that are achieved more efficiently and effectively by the concerted efforts of a group of people rather than by individuals working alone. Organizations are usually structured into departments or functions. Each department is given resources and managed independently, however, they have to collaborate on multi-functional processes. Organizations are devoted to producing goods and/or providing services. They may be for-profit (i.e., businesses) or nonprofit (e.g., hospitals). Their goals, design, management, and outputs (goods/services) may be similar or quite different. Nonetheless, their functions and their processes are similar. A typical organization has three basic functions: operations (representing manufacturing/service), finance, and marketing (including sales) (see Figure 1-1). FIGURE 1-1 The three basic functions of an organization and flows between them These three functions and other supporting functions (e.g., research and development) perform different but related processes necessary for the organization. The functions must interact to achieve the goals and objectives of the organization, and each makes an important contribution. For instance, unless operations and marketing work together, marketing may promote goods or services that operations cannot profitably deliver, or operations may turn out goods or services for which there is no demand. Similarly, unless finance and operations work closely, funds for materials, building expansion, and new equipment may not be available when needed. Let’s take a closer look at these functions. Operations The operations function, representing manufacturing/service processes, manages all the activities directly related to producing goods or providing services. Hence, it exists both in manufacturing industries which are goods producing and in service industries which provide services (see Table 1-1). TABLE 1-1 Examples of industries Industries Examples Goods producing Farming, mining, construction, manufacturing Services Healthcare, transportation, food, warehousing, retailing, wholesaling, banking, film production, broadcasting, phone The production of goods or services involves transforming/converting inputs into finished goods or services. For example, a car body manufacturing process converts sheets of steel into a car body by cutting, forming, and welding operations. The production process must be an adaptive system. To ensure that the desired outputs are obtained, measurements should be taken at various points (feedback), and then compared with previously established standards to determine whether corrective action is needed (control). the conversion process. outputs. Figure 1-2 shows Table 1-2 provides two examples of inputs, transformation processes, and FIGURE 1-2 The operations function involves the conversion of inputs into outputs. Page 5 TABLE 1-2 Illustrations of the transformation process Food Processor Inputs Process Output Raw vegetables Cleaning Canned vegetables Metal sheets Making cans Water Cutting Energy Cooking Labour Packing Building Labelling Equipment Hospital Inputs Process Output Sick patients, doctors, nurses Examination Healthy patients Building Surgery Medical supplies and drugs Monitoring Equipment Medication Laboratories Therapy It is important to note that goods and services often occur jointly. For example, having the oil changed in your car is a service, but the new oil is a good. Similarly, house painting is a service, but the paint is a good. The goods–service package is a continuum. It can range from primarily goods with little service to primarily service with few goods (see Figure 1-3). FIGURE 1-3 The goods–service continuum Page 6 The essence of the operations function is to add value during the transformation process: Value added is the term used to describe the difference between the cost of inputs and the value or price of outputs. In nonprofit organizations, the value of outputs (e.g., highway construction, police and fire protection) is their value to society; the greater the value added, the greater the efficiency of these operations. In for-profit organizations, the value of outputs is measured by the prices that customers are willing to pay for those goods or services. Companies use the money generated by value added for research and development, investment in new facilities and equipment, workers’ salaries, and owners’ profits. Consequently, the greater the value added, the greater the amount of funds available for these purposes. One way that organizations attempt to become more productive (i.e., make more output with the same or fewer inputs) is to critically examine whether any of their activities adds value. Those that do not add value are wasteful. Eliminating or improving such wastes decreases the cost of inputs or transformation, thereby increasing the value added. For instance, a company may discover that it is producing an item much earlier than the scheduled delivery date to a customer, thus requiring the storage of the item in a warehouse until delivery. In effect, additional costs are incurred by storing the item without adding to the value of the item. Reducing storage time would reduce the transformation cost and, hence, increase the value added. A similar comment applies for receiving raw material/parts too early. This is the concept called just-in-time (more in Chapter 14). Obviously, working with suppliers and customers can lead to increased productivity for all sides. This is called supply chain management (more in Chapter 15). Finance The finance function secures funds at favourable terms and allocates those funds throughout the organization. Finance and operations management personnel cooperate by exchanging information and expertise in activities such as: Budgeting. Budgets must be periodically prepared to plan financial requirements. Budgets must sometimes be adjusted, and performance relative to a budget must be evaluated. Provision of funds. The necessary funding of operations and the amount and timing of funding can be important and even critical when funds are tight. Careful planning can help avoid cash flow problems. Most businesses obtain the majority of their funds through the revenues generated by sales of their goods and services. Economic analysis of capital investment proposals. Evaluation of alternative investments in plant and equipment requires inputs from both operations and finance people. Marketing Marketing, including sales, is responsible for receiving customer wants/needs and feedback, and for communicating them to operations and to product design (usually engineers). Operations uses forecast demand/sales to purchase materials and schedule production, while product design people use that information to improve the quality of current goods and services, and to design new ones. Marketing/sales, product design, and operations (representing manufacturing/service) must work closely together to successfully implement product design changes and to develop and produce new products. One important piece of information sales needs from operations is the manufacturing lead time in order to give customers realistic estimates of how long it will take to fill their orders. Other Functions There are many supporting functions that interface with operations (see Figure 1-4). FIGURE 1-4 Operations interfaces with a number of supporting functions. Management accounting supplies management with information on costs of labour, materials, and overhead, and provides reports on items such as scrap, downtime, and inventories. Financial accounting deals with accounts payable and receivable, and gathers the information needed for financial statements. Management information systems (MIS) are concerned with providing management with the information needed to manage effectively. This occurs through computer and communication systems (hardware and software) that capture relevant information and prepare reports. Page 7 Purchasing has responsibility for procurement of materials, supplies, equipment, and services. Close contact with operations is necessary to ensure items are ordered when needed. The purchasing staff identifies appropriate suppliers and facilitates close supplier relationships. Purchasing may also be involved in arranging incoming transportation. The personnel or human resources department is concerned with recruitment and training of personnel, labour relations, contract negotiations, wage and salary administration, and ensuring the health and safety of employees. Manufacturing engineering is responsible for the machines and equipment needed in the production process. Also called process engineers, they are mainly trained as mechanical engineers, but other fields such as electrical and chemical engineering may also be needed. Maintenance and facility management is responsible for maintaining and repairing equipment, buildings and grounds, and heating and air conditioning; removing wastes; and providing parking and security. Product design in manufacturing companies is done by design engineers, but in other companies it could be done by people such as architects, scientists, chemists, and chefs. This function is also called research and development. Designers create goods and services from information given to them by marketing people and provide product specifications to operations to make the products. Logistics involves the transportation of raw material to the plant; storage and warehousing; and transportation of goods to warehouses, retail outlets, or final customers. Some of these interfaces are elaborated on in later chapters. 1.3 The Scope of Operations Management LO3 Describe the scope of operations management and provide an overview of this textbook, including differentiating between design and planning/control decisions. We have already noted that operations management is responsible for the creation of goods and services. This encompasses acquisition of resources and the conversion of raw material into outputs using one or more transformation processes. It involves designing, planning, scheduling, executing, and controlling the activities/operations that make up the processes. A primary function of operations management is decision making. Certain decisions affect the design of the system, and others are planning/control. Design decisions are usually strategic and long-term (1–5 years ahead), whereas planning decisions are tactical and medium-term (1–12 months ahead), and control decisions (including scheduling and execution) are short-term (1–12 weeks ahead). Design involves product, production process, capacity, facility location, layout (arrangement of departments and equipment within a building), buying equipment, and work/job. Planning/control involves quality, inventory, production, scheduling, and project. Operations management is more involved in day-to-day operating decisions and planning than design. However, it has a vital stake in design because design determines limitations of operations, which affects price, timeliness, and quality of products. Even though operations management is not solely responsible for design, it can provide information that will have a bearing on design. Table 1-3 provides additional details on the design and planning/control decisions, and indicates in which chapter each topic is discussed. Page 8 TABLE 1-3 Design and planning/control decisions Decision Area Basic Question(s) Chapter Forecasting What will the demand be? 3 Product design What do customers want? How can products be designed? 4 Capacity (long term) How much capacity will be needed? How can the organization best 5 Design meet capacity requirements? Process design What production process should the organization use? 6 Decision Area Basic Question(s) Layout What is the best arrangement for departments, machines, and Chapter 6 equipment, in terms of work flow? Work/job design How to improve work methods? How to measure work? 7 Location What is a satisfactory location for a facility (factory, warehouse, etc.)? 8 Quality How is quality defined? How is quality achieved and improved? 9 Quality control Are processes performing adequately (i.e., are they in control and 10 Planning/control capable)? Inventory management How much to order? When to reorder? 11 Aggregate planning How to plan production in the medium term? 12 Material requirements How many parts and subassemblies will be needed, and when? 13 Just-in-time How to manage production so that it is fast and lean? 14 Supply chain How can supplier–customer pairs collaborate? Which supplier to 15 management choose? How to transport goods? Scheduling How can jobs best be scheduled? How can staff be scheduled? 16 Project management How to plan, schedule, execute, and control a project? 17 Waiting lines How to model waiting lines? What service capacity is appropriate? 18 planning All of the functions mentioned above play a role in managing operations at an airport like Toronto’s Pearson International Airport. Operations management is essential in ensuring a smooth flow of customers and cargo. Lester Balajadia/Shutterstock Many of the concepts presented in this book apply equally to manufacturing and service industries. Consequently, whether your interest at this time is on manufacturing or on service, these concepts will be important, regardless of whether a manufacturing example or service example is used to illustrate the concept. 1.4 Differentiating Production of Goods and Services LO4 Compare production of goods and services. Production of goods results in a tangible output, such as an automobile, a building, or wheat—anything that we can see or touch. Production industries include manufacturing, construction, agriculture, forestry, fisheries, mining, and oil and gas. Among these, manufacturing is the largest, and consists of these categories: food and beverage, textile and clothing, wood products and furniture, paper and printing, petroleum, chemicals, plastics, primary metals and nonmetals, fabricated metals and nonmetals, machinery, computers and electronics, electrical equipment and appliances, and transportation equipment. Services, on the other hand, imply acts. A physician’s examination, auto repair, lawn care, and theatre are examples of services. The majority of services fall into these categories: government services (federal, provincial, and municipal), wholesale/retail (clothing, food, appliances, stationery, toys, etc.), finance and insurance (banking, stock brokerage, insurance, etc.), real estate rental and leasing, health care (doctors, dentists, hospitals, etc.), professional and technical services (lawyers, accountants, architects, auto mechanics), personal services (laundry, dry cleaning, hair/beauty, lawn care, etc.), business support services (data processing, ebusiness, advertising, employment agencies, etc.), education (schools, colleges, universities, etc.), hotels and restaurants, information, culture and recreation, transportation and warehousing, and utilities. Production of goods and performance of services are often similar in many design and planning/control decisions. However, they differ in: Page 9 1. Customer contact, use of inventories, and demand variability. 2. Uniformity of inputs. 3. Labour content of jobs. 4. Uniformity of outputs. 5. Measurement of productivity. 6. Quality assurance. Let us consider each of these differences. 1. Often, by its nature, a service involves a much higher degree of customer contact. The performance of a service often occurs at the point of consumption. For example, repairing a leaky roof must take place where the roof is, and surgery requires the presence of the patient. On the other hand, goods production allows a separation between production and consumption, so that it may occur away from the consumer. This permits a fair degree of latitude in selecting work methods, assigning jobs, scheduling work, and exercising control over operations. In addition, manufacturers can build up inventories of finished goods, enabling them to absorb some of the shocks caused by variability of demand. Services, however, cannot build up inventories and are much more sensitive to demand variability—banks and supermarkets alternate between lines of customers waiting for service and idle tellers or cashiers waiting for customers. 2. Services are subject to greater variability of inputs than typical manufacturers. Each patient, each lawn, and each auto repair presents a specific problem that often must be diagnosed before it can be remedied. Manufacturers often have the ability to carefully control the amount of variability of their inputs. 3. Services often require a higher labour content, whereas goods production typically can be more capital intensive (i.e., mechanized). 4. Because high mechanization generates products with low variability, goods production tends to be smooth and efficient; service activities sometimes appear to be slow and awkward, and output is more variable. Automated services such as bank automated teller machines (ATMs) are an exception to this. 5. Measurement of productivity (i.e., ratio of outputs to inputs) is more straightforward in goods production due to the high degree of uniformity of items produced. In services, variations in requirements from job to job make productivity measurement considerably more difficult. For example, compare the productivity of two doctors. One may have a large number of routine cases while the other deals with complications, so their productivity appears to differ. 6. Quality assurance is more challenging in services because performance and consumption occur at the same time. In goods production, errors can be corrected before the customer receives the product. Both service and the goods-producing industries are important to the economy. However, services have been growing faster and now account for more than 79 percent of jobs in Canada. See Figure 1-5. Page 10 FIGURE 1-5 Percentage of total labour force by industry Source: Adapted from Statistics Canada, Table 14-10-0291-01, Labour force characteristics by industry. 1.5 The Operations Manager’s Job LO5 Discuss the operations manager’s job. The operations manager has the ultimate responsibility for the creation of goods and/or the delivery of services. The kinds of activities that operations managers perform or oversee vary tremendously from organization to organization, largely because of differences in the type and nature of goods or services produced. Regardless of the nature of the job, many aspects of the operations manager’s activities are managerial. Generally, the operations manager must coordinate the use of resources through the management activities of planning, organizing, directing, and controlling. Note that these activities are defined a little differently than in Table 1-3. Examples of the responsibilities of operations managers according to these classifications are given in Table 1-4. TABLE 1-4 Responsibilities of operations managers Planning Organizing Capacity Degree of centralization Location Departments Mix of products Subcontracting Production process Suppliers Layout Staffing Controlling Directing Inventory control Scheduling Quality control Issuance of work orders Production pace Job assignments Motivation Purchasing Cost control Logistics 1.6 Operations Managers and Decision Making LO6 Describe the key aspects of operations management decision making. The chief role of an operations manager is that of decision maker. In this capacity, the operations manager exerts considerable influence over the degree to which the goals and objectives of the organization are realized. Most decisions involve many possible alternatives that can have quite different impacts on costs or profits. Consequently, it is important to make informed decisions. Throughout this textbook, you will encounter the broad range of decisions that operations managers must make, and you will be introduced to the tools necessary to handle those decisions. This section describes general approaches to decision making, including the use of models, quantitative techniques, performance metrics, analysis of trade-offs, the systems approach, establishing priorities, and ethics. Page 11 Models A model is an abstraction of reality, a simplified representation of something. There are different types of models. For example, a child’s toy car is a physical (iconic) model of a real automobile. Mathematical (symbolic) models represent important characteristics of the object by mathematical symbols and their relationship by mathematical equations and inequalities. Schematic models are graphs, charts, and drawings. Common statistical models include Normal distribution and regression equations. Real life involves an overwhelming amount of detail, much of which is irrelevant for any particular problem. Models ignore the unimportant details so that attention can be concentrated on the most important aspects of a problem, thus increasing the opportunity to understand a problem and find its solution. Because mathematical, schematic, and statistical models play a significant role in operations management decision making, they are heavily integrated into the material of this textbook. For each model, try to learn (1) its purpose, (2) how it is used to generate results, (3) how these results are interpreted and used, and (4) what assumptions and limitations apply. Quantitative Techniques Quantitative techniques are methods that focus on objective measurements and analysis of numbers in order to draw conclusions. They include deterministic and statistical techniques. Examples are: Optimization (i.e., finding the best solution to a mathematical model of a managerial decision problem). A popular technique is linear programming, which is widely used for optimal allocation of scarce resources. Queueing techniques for analyzing situations in which waiting lines form. Inventory techniques to control inventories. Project scheduling technique PERT (program evaluation and review technique) for planning, coordinating, and controlling large-scale projects. Forecasting techniques to forecast demand. Statistical techniques for quality control. Use of most of these quantitative techniques is time consuming and requires computers. In contrast, a heuristic is a quick way to find a good solution. For example, in designing the work of an assembly-line worker, a good heuristic is to choose the longest eligible task that will fit. For many decisions, a heuristic may be the only practical solution. Performance Metrics Managers use metrics to manage and control operations. There are many metrics in use, including those related to profits, costs, quality, productivity, flexibility, assets, inventories, schedules, and forecast accuracy. As you read each chapter, note the metrics being used and how they are applied to manage operations. Analysis of Trade-Offs A trade-off is a balance achieved between two incompatible features—a compromise. For example, (1) in deciding on the amount of inventory to stock, the manager may take into account the trade-off between the increased level of customer service (availability) that the additional inventory would yield and the increased cost of holding that inventory in storage; (2) in selecting a piece of equipment, a manager may evaluate the merits of extra features relative to the cost of those extra features; (3) in the scheduling of overtime to increase output, the manager may weigh the value of the increased output against the higher costs of overtime. Throughout this textbook you will be presented with solution methods that reflect these kinds of Page 12 trade-offs. Managers sometimes deal with these decisions by listing the advantages and disadvantages—the pros and cons—of alternatives to better understand the consequences of the decisions they must make. In some instances, managers can score these outcomes. This can help them “net out” the impact of the trade-offs on their decision. An example of this is the factor-rating approach described in Chapter 8 on location planning and analysis. The Systems Approach A system is a set of interrelated parts that must work together. The systems approach emphasizes interrelationships among these parts. From a systems viewpoint, the output and objectives of the organization as a whole take precedence over those of any one department. A high-level systems view of Figure 1-6. In addition to major departments/functions, a manufacturing organization is displayed in it shows the customers, the products, and the flows of work. It enables us to see how work actually gets done, which is through processes that cut across functional boundaries. It also shows the internal customer–supplier relationships through which goods and services are produced. FIGURE 1-6 High-level systems view of a manufacturing organization Source: Adapted from Table 13 in A.S. Sohal et al., “The Roles and Responsibilities of Production/Operations Managers in SMEs: Evidence From Canada,” Technovation 21(7), pp. 437-448, with permission from Elsevier. The systems approach is essential whenever a product is being designed, redesigned, implemented, improved, or otherwise changed. It is important to take into account the impact on all parts of the system. For example, to investigate if the upcoming model of a vehicle will have automatic parking, a designer must take into account how customers will use it, instructions for its use, chances for misuse, the cost of the software (to control steering, acceleration, and braking) and sensors (to detect objects around the vehicle), and procedures for installing and repairing the sensors and the software. In addition, quality standards will have to be established, marketing must be informed of the new feature, and a software developer and a sensor manufacturer must be selected. Establishing Priorities In virtually every situation, managers discover that certain elements are more important than others. Recognizing this fact enables the managers to direct their efforts to where they will do the most good and to avoid wasting time and energy on insignificant elements. This is referred to as the Pareto phen omenon, which says that some things (a few) will be very important for achieving an objective or solving a problem, and other things (many) will not. This is also known as the 80–20 rule, which states that approximately 80 percent of the results achieved will come from approximately 20 percent of the factors. The implication is that a manager should only deal with important problems, and, for the selected problem, search for the one or two factors that will have the greatest impact. This is one of the most important and pervasive concepts in operations management. In fact, this concept can be applied to all decision making, both professional and personal. Page 13 Ethics Ethics are moral principles that govern a person’s behaviour. Operations managers, like all managers, have the responsibility to make ethical decisions. Ethical issues arise in: Worker safety: providing adequate training, maintaining equipment in good working condition, and maintaining a safe working environment. Product safety: providing products that eliminate the risk of injury to the users. The environment: not doing things that will harm the environment. Closing facilities: taking into account the impact on the community, and honouring commitments that have been made. In making decisions, managers must consider how their decisions will affect shareholders, employees, customers, suppliers, the community at large, and the environment. Finding solutions that will be in the best interest of all of these stakeholders is not always easy, but it is a goal that all operations managers should strive to achieve. 1.7 The Historical Evolution of Operations Management LO7 Briefly describe the historical evolution of operations management. In the earliest days, goods were produced using craft production: highly skilled workers using simple, flexible tools produced goods according to customer specifications. Goods were produced in small shops by experts and their apprentices. Under that system, it was common for one person to be responsible for making a product, such as a horse-drawn wagon or a piece of furniture, from start to finish. Only simple tools were available; the machines that we use today had not been invented. Craft production had major shortcomings. Because products were made by skilled craftsmen who custom-fitted parts, production was slow and costly. And when parts failed, the replacements also had to be custom made, which was also slow and costly. Another shortcoming was that production costs did not decrease as volume increased; there were no economies of scale, which would have provided a major incentive for expansion. Prior to the 1700s, business activities in Canada were limited to fishing and the fur trade. Raw materials were exported to Europe for further processing and manufacturing. Companies such as the Hudson’s Bay Company imported British-made goods to trade with local populations. All manufactured products came from Europe or elsewhere overseas. The Industrial Revolution The Industrial Revolution began in the 1770s in England and spread to the rest of Europe and to North America during the nineteenth century. A number of innovations changed production forever by substituting machine power for human or animal power. Perhaps the most significant of these was the steam engine, made practical by James Watt around 1769. This provided a source of power to operate machines in factories. The spinning jenny (1770) and power loom (1785) revolutionized the textile industry. Machines made of iron replaced simple wooden machines. Two concepts assisted in largescale production: division of labour and interchangeable parts. Page 14 Division of labour, which Adam Smith wrote about in The Wealth of Nations (1776), means that the production process is divided up into a series of small tasks and individual workers are assigned to each one of these tasks. Unlike craft production, where each worker was responsible for doing many tasks and thus required skills, with division of labour the tasks were so narrow that virtually no skill was required. The interchangeable parts concept is attributed to Eli Whitney, an American inventor who applied the concept to assembling muskets in the late 1700s. The basis for interchangeable parts is to standardize parts and make them so precisely that any part in a batch of parts would fit the product without alteration. This meant that parts did not have to be custom fitted, as they were in craft production. The standardized parts could also be used as replacement parts. The result was a tremendous decrease in assembly time and cost. Soon after their invention in Britain, the iron-making and steam engine technologies were imported into North America. In Canada, a few small mills began operating in the first half of the 1800s. By the second half of the 1800s, canals and railways were built, and timber was being exported. The discovery of electricity by Thomas Edison in the late 1800s allowed replacement of steam by electricity as a power source, improving the efficiency and working environment of factories. Despite the major changes that were taking place, management theory and practice had not progressed much from early years. What was needed was a systematic approach to management. Scientific Management Scientific management is applying science to observe, measure, analyze, and improve work methods, including the use of economic incentives. It was spearheaded by American efficiency engineer Frederick Taylor over a century ago. He studied work methods in great detail to identify the best method for doing each job. Taylor’s methods emphasized transferring control from workers to management and maximizing output. The methods were not always popular with workers, who sometimes thought they were used to unfairly increase output without a corresponding increase in compensation. Certainly some companies did abuse workers in their quest for efficiency. Eventually, the public outcry reached the halls of the U.S. Congress, and hearings were held on the matter. Taylor himself was called to testify in 1911, the same year his classic book The Principles of Scientific Management was published. The publicity from those hearings actually helped scientific management achieve wide acceptance in industry. A number of other pioneers also contributed to this movement, including: Frank Gilbreth, an industrial engineer who is often referred to as the father of time and motion study. He developed the principles of motion economy that could be applied to small portions of a task. Lillian Gilbreth, a psychologist and the wife of Frank Gilbreth, who worked with her husband, focusing on the human factor in work. (The Gilbreths were the subject of a classic 1950 film, Cheaper by the Dozen, which was remade in 2003.) Many of her studies in the 1920s dealt with worker fatigue. Henry Gantt, who developed a widely used tool for scheduling, called a Gantt chart or a horizontal bar chart. During the early part of the twentieth century, automobiles were just coming into vogue in North America. Ford’s Model T was such a success that the company had trouble keeping up with orders for the cars. In an effort to improve the efficiency of operations, Henry Ford introduced the moving asse mbly line, a type of assembly line in which the car is pulled along the line at a fixed speed while the workers assemble its parts. Row of “Tin Lizzies,” or Model Ts, being manufactured on an early Ford assembly line. Hulton Archive/Getty Images Ford’s production system is an example of mass production, a system of production in which large volumes of standardized goods are produced by low-skilled or semiskilled workers using highly specialized, and often costly, equipment. Page 15 The Industrial Revolution and scientific management allowed some industrialization in Canada in the beginning of the twentieth century. These changes allowed for more effective exploitation of Canada’s resources, such as minerals and agriculture. Import tariffs encouraged foreign entrepreneurs and companies, mainly Americans, to set up factories and sales offices in Canada; the transfer of technology helped both countries. For example, Massey Ferguson was established and grew as one of the world leaders in agricultural harvesting machinery, and McLaughlin Motor Co. was established in partnership with Buick and later became General Motors of Canada. The United States replaced Britain as Canada’s largest trading partner and investor in 1926. The Human Relations Movement Whereas scientific management emphasized the technical aspects of work in work design, the human relations movement emphasized the importance of workers in work design. There was much emphasis on motivation. During the 1930s, Elton Mayo conducted studies at the Hawthorne division of Western Electric. His studies revealed that, in addition to the physical and technical aspects of work, giving special attention to workers is critical for improving productivity. During the 1940s, Abraham Maslow developed motivational theories that Frederick Hertzberg refined in the 1950s. Douglas McGregor added to this in the 1960s. In the 1970s, William Ouchi combined the Japanese approach (featuring such things as lifetime employment, employee problem solving, and consensus building) with the traditional Western approach (featuring short-term employment, specialists, and individual decision making and responsibility). In the 1980s, Edward E. Lawler III put forward the concept of highinvolvement organization where self-directed teams play a big role (for an example, see the Chapter 7 Opener). Decision Models and Computers The factory movement was accompanied by the development of several quantitative models and techniques. In 1913, F.W. Harris developed one of the first models: a mathematical model for economic order quantity in inventory management. In the 1930s, three co-workers at Bell Telephone Labs—H.F. Dodge, H.G. Romig, and W. Shewhart—developed statistical procedures for sampling and quality control. At first, these quantitative models were not widely used in industry. However, the onset of the Second World War changed that. The war generated tremendous pressures on manufacturing output, and specialists from many disciplines combined efforts to achieve advancements in the military and in manufacturing. This area became known as operations research. After the war, efforts to develop and refine quantitative tools for decision making continued, facilitated by the advent of the mainframe computer in 1951. This resulted in decision models for forecasting, production planning (using the linear programming of Dantzig), project management, and other areas of operations management. During the 1960s and 1970s, quantitative techniques were highly regarded (these modelling solutions for business are called management science); in the 1980s, they lost some favour. However, the widespread use of personal computers (invented in the late 1970s by Apple Computer) and userfriendly software in the workplace is causing resurgence in the popularity of these techniques. In 1975, Orlicky proposed material requirements planning (MRP), mainly for assembly operations. The advent of the computer resulted in its use in machine automation starting in the 1960s. In the midto-late 1980s, network computing began to increase, with applications such as electronic data interchange (EDI) and the ability to instantaneously receive point-of-sale data. This has led to more cooperation with the suppliers in the form of partnering and formation of supply chains. In the early 1990s, the Internet and business process re-engineering began to play major roles in operations. In the late 1990s, more and more companies began to use enterprise resources planning (ERP) software to coordinate their sales, materials management, production planning/manufacturing, and accounting/finance activities. The vast amount of data available now (e.g., customer purchases in a supermarket) has led to Page 16 the popularity of powerful business analytics software. Business analytics comprises software used to build analysis models and simulations to create scenarios, understand realities, and predict future states. Business analytics includes data mining, predictive analytics (forecasting), applied analytics, and statistics.2 Data mining looks for unusual patterns and relationships in data. For example, Walmart has discovered that just before a storm, sales of granola bars peak in its affected stores. Avis Budget uses customer rental data to forecast frequency of future rentals, which is used to decide its customer contact strategy.3 Many websites (e.g., Amazon.com) collect a history of your purchases or even look-ups and recommend items to you (including third-party ads). Xerox has built a model predicting whether a potential employee for its call centres will quit before having worked six months. Interestingly, experience does not matter. An inquisitive person who uses social networks and lives close by with reliable transportation will make an enduring call centre employee.4 The Influence of Japanese Manufacturers A number of Japanese manufacturers have developed or refined management practices that have increased the productivity of their operations and the quality of their products. This has made them very competitive, sparking interest in their approaches by companies outside Japan. One of their approaches, total quality management (TQM), emphasizes quality and continuous improvement, worker empowerment and teams, and achieving customer satisfaction. A related approach is the lean production system and just-in-time (JIT) manufacturing. Lean production uses significantly fewer resources than mass production systems—less space, less inventory, and fewer workers—to produce a comparable amount of output. Lean production systems use a highly skilled workforce and flexible equipment. In effect, they incorporate advantages of both mass production (high volume, low unit cost) and craft production (high variety and flexibility). And quality is higher than in mass production. Lean production is a broad approach to just-in-time manufacturing. World class manufacturing (WCM) is a combination of TQM and JIT with some worker-initiated maintenance (called autonomous maintenance) and industrial engineering. WCM is recently being used by Fiat Chrysler Automobiles, CNH, and others to improve their productivity. The skilled workers in lean production are more involved in maintaining and improving the system than their mass production counterparts are. They are taught to stop production if they discover a defect, and to work with other employees to find and correct the cause of the defect so that it won’t reoccur. This results in an increasing level of quality over time, and eliminates the need to inspect and rework at the end of the line. Because lean production systems operate with lower amounts of inventory, additional emphasis is placed on anticipating when problems might occur before they arise, and avoiding those problems through careful planning. Even so, problems still occur at times, and quick resolution is important. Workers participate in both the planning and correction stages. Technical experts are still used, but more as consultants rather than substitutes for workers. The focus is on designing a system so that workers will be able to achieve high levels of quality and quantity. Compared to workers in traditional systems, much more is expected of workers in lean production systems. They must be able to function in teams, playing active roles in operating and improving the system. Individual creativity is much less important than team success. Responsibilities are also much greater, which can lead to pressure and anxiety not present in traditional systems. Moreover, a flatter organizational structure means career paths are not as steep in lean production organizations. Workers tend to become generalists rather than specialists, another contrast to more traditional organizations. Unions often oppose conversion from a traditional system to a lean system because they view the added responsibility and multiple tasks as an expansion of job requirements without comparable increases in pay. In addition, workers sometimes complain that the company is the primary beneficiary of employeegenerated improvements. Table 1-5 provides a comparison of craft production, mass production, and lean production. Keep in mind that all three of these systems of production are in existence today. Page 17 TABLE 1-5 A comparison of craft, mass, and lean production Description Craft Production Mass Production Lean Production High variety, customized High volume of standardized Moderate to high volume of output, with one or a few output, emphasis on volume. output, with more variety than skilled workers Capitalizes on division of mass production. Less responsible for an entire labour, specialized inventory. Emphasis on unit of output. equipment, and quality. Employee interchangeable parts. involvement and teamwork are important. Examples of Home remodelling and Sugar, steel, movie theatres, Automobiles and their goods and landscaping, tailoring, airlines, hotels, mail sorting, components, electronics, services portrait painting, paper. industrial equipment. produced diagnosis and treatment Wide range of choice, Low cost per unit, requires Flexibility, variety, high quality output tailored to mostly low-skilled workers. of goods. Slow, requires skilled Rigid system, difficult to No safety nets to offset any workers, few economies accommodate changes in system breakdowns, fewer of scale, high cost, and output volume, product opportunities for employee low standardization. design, or process design. advancement, more worker Volume may be emphasized stress, requires higher-skilled at the expense of quality. workers than mass of injuries, surgery. Advantages customer needs. Disadvantages production. Table 1-6 provides a chronological summary of some of the key developments in the evolution of operations management. TABLE 1-6 Historical summary of operations management Year Contribution/Concept Originator 1769 Steam engine James Watt 1776 Division of labour Adam Smith 1790 Interchangeable parts Eli Whitney 1911 Principles of scientific management Frederick W. Taylor 1911 Time and motion study Frank and Lillian Gilbreth 1912 Chart for scheduling activities Henry Gantt 1913 Moving assembly line Henry Ford 1913 Mathematical model for inventory management F.W. Harris 1930 Hawthorne studies on worker motivation Elton Mayo 1935 Statistical procedures for sampling and quality control H.F. Dodge, H.G. Romig, W. Shewhart 1940 Operations research applications in warfare Operations research groups 1947 Linear programming George Dantzig 1951 Commercial digital computers Sperry Univac 1960s Computer-aided automation Numerous 1970s Personal computers Apple 1975 Material requirements planning Joseph Orlicky 1980s Total quality management and lean production/just-in-time Quality gurus; Toyota, and Taiichi Ohno 1990s Internet and ecommerce, globalization, supply chains, and Numerous outsourcing 2000– Business analytics, world class manufacturing, sustainability Numerous 1.8 Major Trends Page 18 LO8 Identify the major trends that affect operations management. Organizations must constantly monitor major trends affecting their operations and take them into account in their strategies and tactics. Lean, TQM/employee involvement, and business analytics, covered in the previous section, are still trending. It appears that the slowdown in the world economy still lingers, especially after the COVID-19 pandemic. Many supply chains are still dealing with disruptions and shortages. Some other major trends affecting operations, which we have not covered yet, are as follows: 1. The Internet and ecommerce. The Internet (the global system of interconnected computer networks) has nurtured ecommerce, which is the use of the Internet to buy and sell goods and services. Ecommerce has resulted in significant operations efficiencies. Social networking sites such as Facebook, Twitter, and LinkedIn are being used by organizations for marketing and recruiting purposes. On the downside, criminals are using the connectivity of the Internet to break into organizations’ computer systems and steal private information or spread computer viruses. This has made cybersecurity essential. 2. Technology. Technological advances have led to a vast array of new products and processes. Undoubtedly the computer has had—and will continue to have—the greatest impact on organizations. Applications include computer-aided product design, rapid prototyping, computer numerically controlled machines, enterprise resource planning (ERP) software, and electronic (data) communication. In addition to the above, technology has provided the opportunity to create business analytics models that can summarize and analyze large amounts of data. Using business analytics methodologies and models has helped managers to gain more accurate insight into their environments and make better decisions. 3. Globalization. Globalization is a worldwide movement toward economic, financial, trade, and operations integration. Increased competition has put downward pressure on product prices, necessitating reduced product life cycles, increased innovation, rapid new product development, and increased outsourcing. China has become the factory of the world, leading to long international supply chains and the importance of managing them. 4. Supply chains. A supply chain is the sequence of organizations that are involved in producing and delivering a product. The sequence begins with suppliers of raw materials and extends all the way to the final consumers. Facilities might include warehouses, factories, distribution centres, and retail outlets. Especially in recent years, disruptions in supply chains due to various reasons (the pandemic, etc.) have had consequences on the availability of products all around the world. We will discuss supply chains and operations management in the next section. Also, Chapter 15 is dedicated to different aspects of managing supply chains. 5. Sustainability. Sustainability refers to reduced use of resources and harm to the environment so that the future is not threatened. Concerns about global warming and pollution have caused governments to impose stricter environmental regulations to reduce their carbon footprint. Activities that are most affected are product design, purchasing and supply chain management, production process, and disaster preparation and response. Note that purchasing of goods from overseas increases not only transportation costs, but also fuel consumption and carbon released into the atmosphere. Green initiatives include reducing packaging, materials, and water and energy use, and buying locally. Other initiatives include refurbishing used equipment (e.g., printers and copiers) and recycling. Puma’s “Clever Little Bag” changed the concept of the shoe box by wrapping footwear in a cardboard structure with 65 percent less cardboard. It uses a bag made of recycled plastic as the outer layer that holds the inner cardboard structure together. Puma expects to cut carbon dioxide emissions by 10,000 tons per year and water, energy, and diesel use by 60 percent due to using fewer materials—8,500 fewer tons of paper, to be specific—and the new packaging’s lighter weight. nicostock/Shutterstock 1.9 Operations Management and Supply Chain Management Page 19 LO9 Describe the role of supply chain management in operations management Operations and supply chains are intrinsically linked, and no business organization could exist without both. As discussed before, a supply chain is the sequence of organizations—their facilities, functions, and activities—that are involved in producing and delivering a product or service. The sequence begins with basic suppliers of raw materials and extends all the way to the final customer (see Figure 1-7). Facilities might include warehouses, factories, processing centres, offices, distribution centres, and retail outlets. Functions and activities include forecasting, purchasing, inventory management, information management, quality assurance, scheduling, production, distribution, delivery, and customer service. FIGURE 1-7 A simple product supply chain Figure 1-8 provides an illustration of the bread supply chain: It begins with wheat growing on a farm and ends with a consumer buying a loaf of bread in a grocery store. Notice that the value of the product increases as it moves down the supply chain. Obviously, if members of a supply chain work together and coordinate their activities, they can all benefit. This is called supply chain management (supply Chapter 15). Supply chain management is the chain management will be discussed extensively in strategic coordination of business functions within a business organization and throughout its supply chain for the purpose of integrating supply and demand management. Page 20 FIGURE 1-8 A supply chain for bread One way to think of a supply chain is that it is like a chain, as its name implies. This is shown in Figure 1-7. The links of the chain would represent various production and/or service operations, such as factories, storage facilities, activities, and modes of transportation (trains, railroads, ships, planes, cars, and people). The chain illustrates both the sequential nature of a supply chain and the interconnectedness of the elements of the supply chain. Each link is a customer of the previous link and a supplier to the following link. It also helps to understand that if any one of the links fails for any reason (quality or delivery issues, weather problems, or some other problem [there are numerous possibilities]), it can interrupt the flow in the supply chain for the following portion of the chain. Figure 1-9. The Another way to think of a supply chain is as a tree with many branches, as shown in main branches of the tree represent key suppliers and transporters (e.g., trucking companies). That view is helpful in grasping the size and complexity that often exists in supply chains. Notice that the main branches of the tree have side branches (their own key suppliers), and those side branches also have their own side branches (their own key suppliers). In fact, an extension of the tree view of a supply chain is that each supplier (branch) has its own supply tree. Referring to Figure 1-8, the farm, mill, and bakery of the trucking companies would have their own “tree” of suppliers. FIGURE 1-9 A supply chain is like a tree with many branches. Supply chains are both external and internal to the organization. The external parts of a supply chain provide raw materials, parts, equipment, supplies, and/or other inputs to the organization, and they deliver outputs that are goods to the organization’s customers. The internal parts of a supply chain are part of the operations function itself, supplying operations with parts and materials, performing work on products, and/or performing services. The Need to Manage Supply Chains Supply chain management is being given increasing attention as business organizations face mounting pressure to improve management of their supply chains. In the past, most organizations did little to manage their supply chains. Instead, they tended to concentrate on their own operations and on their immediate suppliers. Moreover, the planning, marketing, production, and inventory management functions in organizations in supply chains have often operated independently of each other. As a result, supply chains experienced a range of problems that were seemingly beyond the control of individual organizations. The problems included large oscillations of inventories, inventory stockouts, late deliveries, and quality problems. These and other issues now make it clear that management of supply chains is essential to business success. The other issues include the following: 1. The need to improve operations. Efforts on cost and time reduction, and productivity and Page 21 quality improvement, have expanded in recent years to include the supply chain. Opportunity now lies largely with procurement, distribution, and logistics—the supply chain. 2. Increasing levels of outsourcing. Organizations are increasing their levels of outsourcing, buying goods or services instead of producing or providing them themselves. As outsourcing increases, some organizations are spending increasing amounts on supply-related activities (wrapping, packaging, moving, loading and unloading, and sorting). A significant amount of the cost and time spent on these and other related activities may be unnecessary. Issues with imported products, including tainted food products, toothpaste, and pet foods, as well as unsafe tires and toys, have led to questions of liability and the need for companies to take responsibility for monitoring the safety of outsourced goods. 3. Increasing transportation costs. Transportation costs are increasing, and they need to be more carefully managed. 4. Competitive pressures. Competitive pressures have led to an increasing number of new products, shorter product development cycles, and increased demand for customization. And in some industries, most notably consumer electronics, product life cycles are relatively short. Added to this are the adoption of quick-response strategies and efforts to reduce lead times. 5. Increasing globalization. Increasing globalization has expanded the physical length of supply chains. A global supply chain increases the challenges of managing a supply chain. Having far-flung customers and/or suppliers means longer lead times and greater opportunities for disruption of deliveries. Often, currency differences and monetary fluctuations are factors, as well as language and cultural differences. Also, tightened border security in some instances has slowed shipments of goods. 6. Increasing importance of e-business. The increasing importance of e-business has added new dimensions to business buying and selling and has presented new challenges. 7. The complexity of supply chains. Supply chains are complex; they are dynamic, and they have many inherent uncertainties that can adversely affect them, such as inaccurate forecasts, late deliveries, substandard quality, equipment breakdowns, and cancelled or changed orders. 8. The need to manage inventories. Inventories play a major role in the success or failure of a supply chain, so it is important to coordinate inventory levels throughout a supply chain. Shortages can severely disrupt the timely flow of work and have far-reaching impacts, while excess inventories add unnecessary costs. It would not be unusual to find inventory shortages in some parts of a supply chain and excess inventories in other parts of the same supply chain. 9. The need to deal with trade wars. Trade wars can occur if a country objects to its trade imbalance with another country. This can result in tariffs and retaliatory tariffs, causing changes in cost structures. Uncertainty about how long and to what degree tariffs will be in place can greatly increase pressure on companies that have global supply chains. Grocery stores across Canada rely on strong interconnected supply chains to ensure customers have access to fresh produce all year round. Monkey Business Images/Shutterstock Elements of Supply Chain Management Supply chain management involves coordinating activities across the supply chain. Central to this is taking customer demand and translating it into corresponding activities at each level of the supply chain. The key elements of supply chain management are listed in Table 1-7. The first element, customers, is the driving element. Typically, marketing is responsible for determining what customers want, as well as forecasting the quantities and timing of customer demand. Product and service design must match customer wants with operations capabilities. Page 22 TABLE 1-7 Elements of supply chain management Element Typical Issues Customers Determining what products and/or services customers want 3, Forecasting Predicting the quantity and timing of customer demand 3 Design Incorporating customers’ wants, manufacturability, and time to market 4 Capacity Matching supply and demand 5, Planning Chapters 4 12 Element Typical Issues Processing Controlling quality, scheduling work 10, 16 Inventory Meeting demand requirements while managing the costs of holding 11, 13, inventory 14 Evaluating potential suppliers, supporting the needs of operations on 15 Purchasing Chapters purchased goods and services Suppliers Monitoring supplier quality, on-time delivery, and flexibility; maintaining 15 supplier relations Location Determining the location of facilities 8 Logistics Deciding how to best move information and materials 15 Processing occurs in each component of the supply chain: It is the core of each organization. The major portion of processing occurs in the organization that produces the product or service for the final customer (the organization that assembles the computer, services the car, etc.). A major aspect of this for both the internal and external portions of a supply chain is scheduling. Inventory is a staple in most supply chains. Balance is the main objective; too little causes delays and disrupts schedules, but too much adds unnecessary costs and limits flexibility. Purchasing is the link between an organization and its suppliers. It is responsible for obtaining goods and/or services that will be used to produce products or provide services for the organization’s customers. Purchasing selects suppliers, negotiates contracts, establishes alliances, and acts as a liaison between suppliers and various internal departments. The supply portion of a value chain is made up of one or more suppliers, all links in the chain, and each one capable of having an impact on the effectiveness—or the ineffectiveness—of the supply chain. Moreover, it is essential that the planning and execution be carefully coordinated between suppliers and all members of the demand portion of their chains. Location can be a factor in a number of ways. Where suppliers are located can be important, as can the location of processing facilities. Nearness to market, nearness to sources of supply, or nearness to both may be critical. Also, delivery time and cost are usually affected by location. Two types of decisions are relevant to supply chain management—strategic and operational. The strategic decisions are the design and policy decisions. The operational decisions relate to day-to-day activities: managing the flow of material and product and other aspects of the supply chain in accordance with strategic decisions. The major decision areas in supply chain management are location, production, distribution, and inventory. The location decision relates to the choice of locations for both production and distribution facilities. Production and transportation costs and delivery lead times are important. Production and distribution decisions focus on what customers want, when they want it, and how much is needed. Outsourcing can be a consideration. Distribution decisions are strongly influenced by transportation cost and delivery times, because transportation costs often represent a significant portion of total cost. Moreover, shipping alternatives are closely tied to production and inventory decisions. For example, using air transport means higher costs but faster deliveries and less inventory in transit than sea, rail, or trucking options. Distribution decisions must also take into account capacity and quality issues. Operational decisions focus on scheduling, maintaining equipment, and meeting customer demand. Quality control and workload balancing are also important considerations. Inventory decisions relate to determining inventory needs and coordinating production and stocking decisions throughout the supply chain. Logistics management plays the key role in inventory decisions. Enterprise resource planning (ERP) is being increasingly used to provide information sharing in real time among organizations and their major supply chain partners. This important topic is discussed in more detail in Chapter 13. SUMMARY Operations management is responsible for planning and coordinating the use of the organization’s resources to convert inputs into outputs. Page 23 The operations function is one of three primary functions of organizations; the other two are marketing and finance. The operations function is present in both service- and goodsproducing organizations. Operations management techniques are practised in both service and manufacturing industries. Operations decisions involve design and planning/control decisions. Design decisions relate to product design, capacity planning, process design, layout of facilities, work design, and selecting locations for facilities. Planning/control decisions relate to quality management, production planning, scheduling and control, inventory management, and project management. Service differs from goods production in customer contact and labour content, lack of inventories, variation in inputs and outputs, and difficulties in productivity measurement and quality assurance. Operations managers plan, organize, control, and direct the operations of an organization. Operations managers use models, quantitative techniques, performance metrics, trade-off analysis, systems approach, priorities, and ethics in decision making. The chapter provides a brief discussion of the historical evolution of operations management, including craft, mass, and lean production systems. Recent trends in OM include ecommerce, technology, globalization, supply chains, and sustainability. Operations management and supply chain management overlap in many areas and are intrinsically linked. KEY TERMS business analytics craft production division of labour economies of scale effectiveness efficiency ethics globalization good heuristic interchangeable parts manufacturing lead time mass production model moving assembly line operations management outsourcing Pareto phenomenon process quantitative techniques scientific management service supply chain supply chain management sustainability system trade-off value added DISCUSSION AND REVIEW QUESTIONS 1. Briefly define the term operations management. LO1 2. Name the titles of three jobs in operations management. LO1 3. Why is operations management important to any organization? LO1 4. Identify the three major functional areas of organizations and briefly describe how they interrelate. LO2 5. Describe the operations function and the nature of the operations managers job. LO2 & LO5 6. Explain the difference between design and planning/control decisions. LO3 7. List five important differences between producing goods and performing services. LO4 8. Give an example of a pure service (i.e., one where no goods are exchanged). What do you think is being transformed? LO2 & LO4 9. Give three specific activities an operations manager is likely involved in. LO5 10. Briefly discuss each of these terms related to the historical evolution of operations management: LO7 a. Industrial Revolution. b. Scientific management. c. Interchangeable parts. d. Division of labour. 11. Why are services important? Why is manufacturing important? Give two examples of each. LO4 12. What is a model and why are models important? LO6 13. Name three people who have contributed to the development of operations management. LO7 14. List the trade-offs you would consider for each of these decisions: a. Owning a car versus using public transportation. b. Buying a computer now versus waiting for an improved model. LO6 c. Buying a new car versus buying a used car. d. Speaking up in class versus waiting to get called on by the instructor. 15. Describe each of these systems, including their main advantage and disadvantage, and give an example for each: craft production, mass production, and lean production. LO7 16. Why might some people prefer not to work in a lean production system? LO7 17. How have technological changes affected you? Are there any downsides to technological change? Explain. LO8 18. Identify some of the current trends in operations management and relate them to recent news or to your personal experience. LO8 19. Give an example of an unethical behaviour you have observed. 20. Explain the term value added. LO6 LO2 21. What is a supply chain and what is supply chain management? 22. What is sustainability and why is it important? LO8 LO8 23. Name three process types, and give an example for each type in the context of an airline. LO1 24. What is business analytics? Name its various types. LO7 25. What is meant by an internal customersupplier relationship? LO6 TAKING STOCK Page 24 This item appears at the end of each chapter. It is intended to focus your attention on four key issues for organizations in general, and operations management in particular. These issues are trade-off analysis, collaboration among various functional areas of the organization, the impact of technology, and ethical issues. You will see four questions relating to these issues. 1. What is a trade-off? Why is careful consideration of trade-offs important in decision making? LO6 2. Why is it important for the various functions of an organization to collaborate? 3. In what ways has technology impacted operations? LO2 LO8 4. Why is employing child labour (10- to 15-year-olds) in developing countries unethical? LO6 CRITICAL THINKING EXERCISES This item also will appear in every chapter. It allows you to critically apply information you learned in the chapter to practical situations. 1. Many organizations offer a combination of goods and services to their customers. As you learned in this chapter, there are some key differences between production of goods and delivery of services. What are the implications of these differences to managing operations? LO4 2. Some people who work in the knowledge or arts sectors and whose jobs involve creativity argue that their job cannot be defined as a process (i.e., a sequence of predetermined activities). Discuss. LO1 3. Car sharing is a model of car rental in which people rent cars for short periods of time, often by the hour. The car has to be located close to the customer’s residence or workplace, so cars are distributed in the community. The rental process has to be selfservice and cars need to be available 24 hours a day. The primary markets are large metropolitan areas, universities, and corporate campuses where there is a relatively high burden of car ownership. The car-share operator pays for maintenance, parking, gas, and insurance of the vehicle. Explain in detail how a car-sharing business such as Enterprise C arShare operates. LO1 4. What ethical considerations are important in the development of technology in general, as well as AI (artificial intelligence)? LO6 5. What would cause a businessperson to make an unethical decision? What are the risks of doing so? LO6 MINI-CASES Page 25 Mini-Case SobeysB Sobeys Inc. is the second largest grocery store chain in Canada (the largest is Loblaw). Sobeys distinguishes itself from Loblaw by offering better quality fresh food and customer service. Sobeys grew out of Nova Scotia mostly through acquisition of other grocery chains. Sobeys has more than 1,600 owned or franchised stores across all 10 Canadian provinces and more than 350 retail fuel locations. Sobeys has revenues of over $24 billion (2018 data) and employs over 125,000 people. Sobeys is also a wholesaler to over 8,000 retail accounts. Its business spans a national network of 28 distribution centres. Sobeys has many subsidiaries, including Big 8 Beverages, Chalo FreshCo, Farm Boy, Foodland, FreshCo, Lawtons, Marché Bonichoix, Marché Tradition, BoniSoir, Dépanneur Voisin, Safeway, and so on. Sobeys has five different store sizes and formats, and uses them in each location based on market size and customer demographics. There is the large full-service format (such as Sobeys, Sobeys extra, IGA extra, Safeway and Thrifty Foods); urban fresh format (such as Sobeys Urban Fresh and IGA in Quebec); small community format (such as Foodland, Marché Bonichoix, and Les Marchés Tradition); discount format (such as FreshCo and Price Chopper); and convenience format (such as Needs Convenience and IGA express). Approximately 350 large full-service stores have instore pharmacies. Sobeys also has a chain of 78 drugstores (Lawtons Drugs) in Atlantic Canada, over 300 retail gas stations, and 80 liquor stores. Torontonian/Alamy Stock Photo In addition to national brands, Sobeys has its own private label brands: Compliments, Panache, Best Buy, Eight Treasures, and Chalo. Sobeys also has its own manufacturer —Big 8 Beverages—for its private label soft drinks and water in Atlantic Canada. Sobeys is a wholly owned subsidiary of Empire Company Limited, which also has approximately 40 percent equity interest in Crombie REIT, a real estate development and management company. Crombie owns the buildings and shopping plazas that Sobeys stores occupy, as well as other properties. Sobeys has implemented SAP (an enterprise resource planning software) nationwide and across its brand stores. The stores are organized by region: Atlantic Canada/Ontario, Quebec, and Western Canada. Most products are bought centrally and distributed to the stores through 27 regional distribution centres (DCs) located throughout the country. The fully automated Vaughan and Terrebonne DCs are state of the art. Operations management activities and decisions are split between corporate office and store operations. The corporate office initiates and manages various programs to increase the number of customers, including constant evaluation of store performance, closing low-profit stores, opening new stores, and modernizing existing stores. It also manages the computer technology, performs data analytics to improve category management, initiates training programs, and performs accounting and finance activities. Directors of operations (i.e., district managers) interact with the store managers in their district to implement improvement programs such as sharing best practices. Store managers supervise all facets of the store and ensure operational excellence in retail merchandising, inventory management, and customer relations. They ensure execution of the retail programs by communicating the operational requirements and/or changes and store vision to the employees. This includes occupational health and safety, food safety, and other regulatory requirements and procedures. Store managers also oversee recruitment, orientation, training, and performance management. Sobeys also cares about sustainability. It sets targets for greenhouse gas reductions and measures its progress (28 percent reduction by 2030 compared to 2019). It has reduced food waste across stores (22 percent reduction since 2016). It has reduced its use of electricity and amount of material sent to landfill and has donated $13 million in partnership with Earth Day Canada to support environmental initiatives since 2008. Questions 1. What are the inputs, process, output, and feedback/control for a grocery store such as Sobeys? 2. What are the operations decisions for running a grocery store such as Sobeys? Page 26 Mini-Case Small Business Operations Hazel had worked for the same Fortune 500 company for almost 15 years. Although the company had gone through some tough times, things were starting to turn around. Customer orders were up, and quality and productivity had improved dramatically from what they had been only a few years earlier due to a companywide quality improvement program. So it came as a real shock to Hazel and about 400 of her coworkers when they were suddenly terminated following the new CEO’s decision to downsize the company. After recovering from the initial shock, Hazel tried to find employment elsewhere. Despite her efforts, after eight months of searching she was no closer to finding a job than the day she started. Her funds were being depleted and she was getting more discouraged. There was one bright spot, though: She was able to bring in a little money by mowing lawns for her neighbours. She got involved quite by chance when she heard one neighbour remark that now that his children were on their own, nobody was around to cut the grass. Almost jokingly, Hazel asked him how much he’d be willing to pay. Soon Hazel was mowing the lawns of five neighbours. Other neighbours wanted her to work on their lawns, but she didn’t feel she could spare any more time from her job search. However, as the rejection letters began to pile up, Hazel knew she had to make a decision. On a sunny Tuesday morning, she decided, like many others in a similar situation, to go into business for herself—taking care of neighbourhood lawns. She was relieved to give up the stress of job hunting, and she was excited about the prospect of being her own boss. But she was also fearful of being completely on her own. Nevertheless, Hazel was determined to make a go of it. At first, business was a little slow, but once people realized Hazel was available, many asked her to take care of their lawns. Some people were simply glad to turn the work over to her; others switched from professional lawn care services. By the end of her first year in business, Hazel knew she could earn a living this way. She also performed other services such as fertilizing lawns, weeding gardens, and trimming shrubbery. Business became so good that Hazel hired two part-time workers to assist her and, even then, she believed she could expand further if she wanted to. Questions 1. Hazel is the operations manager of her business. Among her responsibilities are forecasting, inventory management, scheduling, quality assurance, and maintenance. a. What kinds of things would likely require forecasts? b. What inventory items does Hazel probably have? Name one inventory decision she has to make periodically. c. What scheduling must she do? What things might occur to disrupt schedules and cause Hazel to reschedule? d. How important is quality assurance to Hazel’s business? Explain. e. What kinds of maintenance must be performed? 2. In what ways are Hazel’s customers most likely to judge the quality of her lawn care services? 3. What are some of the trade-offs that Hazel probably considered relative to: a. Working for a company instead of for herself? b. Expanding the business? c. Launching a website? 4. The town is considering an ordinance that would prohibit putting grass clippings at the curb for pickup because local landfills cannot handle the volume. What options might Hazel consider if the ordinance is passed? Name two advantages and two drawbacks of each option. 5. Hazel decided to offer the students who worked for her a bonus of $25 for ideas on how to improve the business, and they provided several good ideas. One idea that she initially rejected now appears to hold great promise. The student who proposed the idea has left, and is currently working for a competitor. Should Hazel send that student a cheque for the idea? What are the possible trade-offs? 6. All managers have to cope with variation. a. What are the major sources of variation that Hazel has to contend with? b. How might these sources of variation impact Hazel’s ability to match supply and demand? c. What are some ways she can cope with variation? 7. Hazel is thinking of making some of her operations sustainable. What are some ideas she might consider? PROBLEM-SOLVING GUIDE Here is a procedure that will help you to solve most of the end-of-chapter problems in this textbook and on exams: Page 27 1. Identify the question to be answered. 2. Summarize the information given in the problem statement using the appropriate symbols. 3. Determine what type of problem it is so you can select the appropriate problem-solving tools, such as a formula or table. Check your notes from class, chapter examples, and the Solved Problems section of the chapter, and any preceding chapter problems you have already solved for guidance. 4. Solve the problem and indicate your answer. Example 1 Department A can produce parts at a rate of 50/day. Department B uses those parts at the rate of 10/day. Each day unused parts are added to inventory. At what rate does the inventory of unused parts build up? Solution 1. The question to be answered: At what rate does inventory of unused parts build up (i.e., increase) per day? 2. The given information: Production rate = 50 parts/day Usage rate = 10 parts/day 3. For this simple problem, no formula or table is needed. Inventory buildup is simply the difference between the production and usage rates. 4. Production rate = 50 parts/day Usage rate = 10 parts/day Inventory buildup = 40 parts/day Example 2 Companies often use this formula (the economic order quantity) to determine how much of a certain item to order: Q = √ 2DS H where Q = Order quantity D = Annual demand S = Ordering cost H = Annual holding cost per unit If annual demand is 400 units, ordering cost is $36, and annual holding cost is $2 per unit, what is the order quantity? Solution 1. The question to be answered: What is the order quantity, Q? 2. The information given in the problem: D = 400units/year, S = $36, H = $2 per year 3. To solve the problem, substitute the values given in the problem into the formula. 4. Solution: Q = √ 2(400units/yr.)$36 = 120 units $2/unit/yr. CHAPTER 2 Competitiveness, Strategic Planning, and Productivity Page 28 jipen/123RF LEARNING OBJECTIVES After completing this chapter, you should be able to: LO1 LO2 LO3 List and discuss the primary ways that organizations compete and the reasons business organizations fail. Describe mission/vision, goals, strategies, tactics, strategy formulation, and explain supply chain strategy, global strategy, and sustainability strategy. Discuss operations strategy and strategic operations management, and explain operations strategy formulation and generic operations strategies. LO4 LO5 LO6 Explain the implications of organization strategy for operations and supply chain management. Describe transforming strategy into action: the balanced scorecard. Define and measure productivity, explain several factors that affect productivity, describe why it is important to organizations, and discuss improving productivity. IKEA serves customers who are happy to trade service for price. It targets young furniture buyers who want style at low cost. IKEA designs its own modular low-cost furniture which is packaged in the smallest box(es) possible and is easy to assemble. Customers usually do their own in-store pick-up, delivery, and at-home assembly. IKEA’s vision is “to create a better everyday life for the many people.” Its business idea is “to offer a wide range of well designed, functional home furnishing products at prices so low that as many people as possible will be able to afford them.” It achieves quality at affordable prices through optimizing its entire supply chain, by offering lower prices, building long-term supplier relationships, expanding the international market, investing in highly automated production, increasing the variety of products, and producing large volumes. The IKEA sustainability strategy is a circular supply chain, as IKEA describes: “It’s about designing all of our products from the very beginning to be repurposed, repaired, reused, resold and recycled, generating as little waste as possible.”1 A circular supply chain “is one where every product is designed and produced with its next use in mind.” Therefore, IKEA treats the “waste” as a valuable resource for its production. IKEA’s long-term objective is to eliminate waste across the value chain through prevention, reduction, reuse, and recycling. Thus, they can reduce both costs and the negative impacts while also securing resources for the future. As IKEA says, “we are transforming our business by investing in renewable energy, reducing waste and cutting energy use and CO2 in our supply chain.”2 2.1 Introduction In this chapter, you will learn about the different ways companies compete and why some firms Page 29 do a very good job of competing. You will learn how effective strategies can lead to competitive organizations, as well as what productivity is, why it is important, and what organizations can do to improve it. In order to achieve this goal, this chapter describes competitiveness, strategic planning, and productivity: three related topics that are vitally important to organizations. Competitiveness is the ability and performance of an organization in the market compared to other organizations that offer similar goods or services. Strategy is the long-term plans that determine the direction an organization takes to become (or remain) competitive. Strategic planning is the managerial process that determines a strategy for the organization and implements it through allocation of resources and action plans. Lastly, productivity is a measure of productive use of resources. Slumping productivity growth in recent years and the impressive successes of foreign competition in the market have caused many North American companies to rethink their strategies and to place increased emphasis on their operations. 2.2 Competitiveness LO1 List and discuss the primary ways that organizations compete and the reasons business organizations fail. A company must be competitive relative to others to profitably sell its goods and services in the market. Competitiveness is the reason a company prospers, barely gets by, or fails. Competitiveness means how effectively an organization meets the wants and needs of customers relative to others that offer similar goods or services, which depends on its capabilities and performance in its market. Capabilities or competencies are developed over time by focusing on a limited range of goods or services and/or on a technology. Companies use past experience and expertise in design, manufacturing/service, or marketing, and leverage them to introduce new goods and services.3 An organization’s performance in the market depends on the expectations of its customers for the purchase of goods or services. A customer can be a consumer (i.e., the final or end customer) or another company. The main buying factors that customers use are price, quality, variety, and timeliness; these are called key purchasing criteria and are briefly described in Table 2-1. TABLE 2-1 Key purchasing criteria Criteria Description Price The amount a customer must pay for the good or service. If all other factors are equal, customers will choose the good or service that has the lowest price. Quality The characteristics of a good or service that are determined by its design, material, performance, consistency, etc. (We will explore this further in Chapter 9.) Here, we also include customer service (e.g., easy and fast returns, warranty repairs, response to requests) and innovation in products (e.g., iPhone). Variety The choice of models and options available to customers. The more variety, the wider the range of potential customers. On-Time The availability of goods or services when they are needed by the customer. This means Delivery an order being delivered on time (as in just-in-time purchasing) or quickly. We also include (Timeliness) convenience of location here. Most customers tend to trade off price against the other purchasing criteria and choose the “best buy” or best “value”: Quality, timeliness,etc. Value = Price In complex purchases, customers may use two categories of purchasing criteria: order qualifiers Page 30 and order winners.4 Order qualifiers are the competitive standard characteristics of a product or service that cause it to be viewed for purchase by a consumer. However, these may not be sufficient to get a customer to purchase. Order winners are the characteristics that distinguish the product or service from others to be more competitive and better for a customer and win the customer’s purchase. Purchasing criteria such as price, on-time delivery, fast delivery, and quality can be order qualifiers or order winners. Over time a characteristic that once was an order winner may become an order qualifier, and vice versa. For example, in the past, a certain percentage of defective items was acceptable to most industrial buyers, but not now. This means that excellent quality (close to zero defects) was not an order qualifier before but has become one now. Obviously, it is important to determine the set of order qualifiers and order winners, and the relative importance of each, for each market so that appropriate attention can be given to them. Marketing must make that determination and communicate it to operations. For example, for business air travellers, comfort/convenience (quality and customer service), and being on time are most important (i.e., are order qualifiers), whereas for economy air travellers, price is most important (i.e., is the order qualifier). Also, for high-tech products such as an iPhone, innovative features relating to quality are most important, but for mature products, price, quality, and availability/on-time delivery are paramount. Organizations compete by emphasizing one or more of the key purchasing criteria in their operations. From an organization’s point of view, these are called competitive priorities and are briefly described in Table 2-2. TABLE 2-2 Competitive priorities Priority Description Cost The unit production cost of a good or service (i.e., price from a customer’s perspective) to the organization. Organizations that compete based on cost emphasize lowering their operating costs. Quality From an organization’s perspective, quality means determining customers’ quality requirements, translating these into specifications for goods or services, and consistently producing goods or services to these specifications. Customer satisfaction and product innovation are included here. Flexibility The ability to product a variety of goods or services. This also includes customization, which is modifying goods or services to meet the requirements of individual customers. It may also refer to being able to easily increase or decrease the production quantity of goods or services Priority Description (quantity flexibility). Flexibility is usually achieved by having general-purpose equipment, excess capacity or inventory, and multi-skilled workers, resulting in easy changeover between products. On-Time & The ability to consistently and promptly meet promised due dates by producing/delivering Reliable goods or services on time and quickly. This also includes locating close to customers. Delivery Delivery reliability and speed is achieved by using faster and more reliable resources/processes. If an organization is far from being competitive, it may be able to improve many or all of its competitive priorities simultaneously. However, as the organization becomes more competitive, it tends to reach a point where improving one priority can be achieved only by reducing the emphasis on another priority (i.e., a trade-off is required, perhaps in delivery speed versus cost). The result of this is a focus on only one priority at a time. It has been observed that most companies first emphasize quality, and only after their quality has reached a competitive level do they focus on delivery reliability, then on low-cost operations, and finally on flexibility. Table 2-3 lists competitive priorities and examples of companies that emphasize them. Page 31 TABLE 2-3 Examples of competitive priorities used by companies Competitive Priority Emphasis Company Examples Cost Low cost The Great Canadian Superstore (Loblaw), WestJet, Walmart, Amazon, IKEA Quality Meeting customer Sony, Sobeys, Toyota, Honda Apple, 3M, IKEA, GE, Boeing, requirements Innovation Disney Amazon, Costco Customer service Flexibility Variety Quantity flexibility Dell Computer, Walmart Potash Corp, Air Canada Delivery Rapid delivery On-time McDonald’s, UPS, FedEx, Domino’s Pizza WestJet, Shoppers delivery Drug Mart, Magna International ( just-in-time supplier) Understanding competitive issues can help managers develop successful strategies. Why Some Organizations Fail Organizations fail, or perform poorly, for a variety of reasons. Being aware of those reasons can help managers avoid making similar mistakes. Among the chief reasons are the following: 1. Neglecting operations strategy 2. Failing to take advantage of strengths and opportunities, or failing to recognize competitive threats 3. Putting too much emphasis on short-term financial performance at the expense of research and development 4. Neglecting investments in capital and human resources 5. Failing to establish good internal communications and cooperation among different functional areas 6. Failing to consider customer wants and needs The key to successfully competing is to determine what customers want and then directing efforts toward meeting (or even exceeding) customer expectations. Two basic issues must be addressed: (1) What do the customers want? (Which items on the preceding list of the ways business organizations compete are important to customers?) and (2) What is the best way to satisfy those wants? Operations must work with marketing to obtain information on the relative importance of the various items to each major customer or target market. Understanding competitive issues can help managers develop successful strategies. 2.3 Mission and Strategies LO2 Describe mission/vision, goals, strategies, tactics, strategy formulation, and explain supply chain strategy, global strategy, and sustainability strategy. An organization’s mission is the reason for its existence. It is expressed in its mission statement. For a business organization, the mission statement should answer the question, “What business are we in?” Missions vary from organization to organization, depending on the nature of the business. Table 2-4provides several examples of mission statements. Vision is where the organization desires to be in the future. Vision has to be realistic. Page 32 TABLE 2-4 Selected company mission statements Company Mission Statement Starbucks With every cup, with every conversation, with every community – we nurture the limitless possibilities of human connection. WestJet To enrich the lives of everyone in WestJet’s world. We’re proud to have won awards that show us you think we do. Food Banks Canada Our mission is to relieve hunger today and prevent hunger tomorrow. Sources: Starbucks.com, “Our Mission,” https://stories.starbucks.com/mission; WestJet.com, “Who We Are,” https://www.westjet.com/en-ca/aboutus/index; Food Banks Canada, https://foodbankscanada.ca/. A mission statement serves as the basis for organizational goals, which provide more detail and describe the scope of the mission. The mission and goals often relate to how an organization wants to be perceived by the general public, and by its employees, suppliers, and customers. Goals serve as a foundation for the development of organizational strategies. These, in turn, provide the basis for strategies and tactics of the functional units of the organization. Organizational strategy is important because it guides the organization by providing direction for, and alignment of, the goals and strategies of the functional units. Moreover, strategies can be the main reason for the success or failure of an organization. Strategies are the long-term plans that determine the direction an organization will take to become (or remain) competitive. A strategy is determined during the strategic planning process. There are three basic business strategies: Low cost Responsiveness Differentiation from competitors Responsiveness relates to the ability to respond to changing demands. Differentiation can relate to product or service features, quality, reputation, or customer service. Some organizations focus on a single strategy, while others employ a combination of strategies. One company that has multiple strategies is Amazon. Not only does it offer low cost and quick, reliable deliveries, but it also excels in customer service. Strategies and Tactics If you think of goals as destinations, then strategies are the roadmaps for reaching those destinations. Strategies provide focus for decision making. Generally speaking, organizations have overall strategies called organizational strategies, which relate to the entire organization. Examples of organizational strategy include branding, growth (products, markets, process/vertical integration), niche market (e.g., IKEA), product differentiation, first-to-market, technology innovation, ecommerce, low cost, global selling and operations, partnership, and sustainability. They also have functional strategies, which relate to each of the functional areas of the organization such as marketing, finance, and operations. The functional strategies should support the overall strategies of the organization, just as the organizational strategies should support the goals and mission of the organization. Tactics are the methods and actions used to accomplish strategies. They are more specific than strategies, and they provide guidance and direction for carrying out actual operations, which need the most specific and detailed plans and decision making in an organization. You might think of tactics as the “how to” part of the process (e.g., how to reach the destination, following the strategy roadmap), and operations as the actual “doing” part of the process. Much of this book deals with tactical operations. A simple example may help put these concepts into perspective. Page 33 EXAMPLE 2-1 Lily is a high school student. She would like to live comfortably. A possible scenario for achieving her mission/vision might look something like this: Mission: Live a good life. Goal: Successful career, good income. Strategy: Obtain a college/university degree. Tactics: Select a college/university and a major; decide how to finance the education. Operations: Register, buy books, take courses, study. It should be apparent that the overall relationship that exists from the mission down to actual policies and action plans—that is, policy deployment—is hierarchical (i.e., top down) in nature. This is illustrated in Figure 2-1. However, a strategy should also reflect the day-to-day experience of employees (bottom up). The policies and action plans should be consistent (i.e., fit together) and be reinforcing. They should not only improve the performance of an organization to meet its customers’ needs, but also increase the organization’s long-term capabilities. Note that radical changes will face resistance and should be implemented carefully. FIGURE 2-1 Strategic planning is hierarchical in organizations. Source: Based on J. H. Sheridan, “America’s Best Plants: Wilson Sporting Goods,” Industry Week 241(20), October 19, 1992, pp. 59–62. Here are some examples of different strategies an organization might choose from: 1. Low cost. Outsource operations to third-world countries that have low labour costs. 2. Scale-based strategies. Use capital-intensive methods to achieve high output volume and low unit costs. 3. Specialization. Focus on narrow product lines or limited service to achieve higher quality. 4. Newness. Focus on innovation to create new products or services. 5. Flexible operations. Focus on quick response and/or customization. 6. High quality. Focus on achieving higher quality than competitors. 7. Service. Focus on various aspects of service (e.g., helpful, courteous, reliable, etc.). 8. Sustainability. Focus on environmentally friendly and energy-efficient operations. Page 34 A wide range of business organizations are beginning to recognize the strategic advantages of sustainability, not only in economic terms, but also through promotional benefits by publicizing their sustainability efforts and achievements. Sometimes, organizations will combine two or more of these, or other approaches, into their strategy. However, unless they are careful, they risk losing focus and not achieving advantage in any category. Generally speaking, strategy formulation takes into account the way organizations compete and a particular organization’s assessment of its own strengths and weaknesses in order to take advantage of its core competencies—those special attributes or abilities possessed by an organization that give it a competitive edge. The most effective organizations use an approach that develops core competencies based on customer needs, as well as on what the competition is doing. Marketing and operations work closely to match customer needs with operations capabilities. Competitor competencies are important for several reasons. For example, if a competitor is able to supply high-quality products, it may be necessary to meet that high quality as a baseline. However, merely matching a competitor is usually not sufficient to gain market share. It may be necessary to exceed the quality level of the competitor or gain an edge by excelling in one or more other dimensions, such as rapid delivery or service after the sale. Walmart, for example, has been very successful in managing its supply chain, which has contributed to its competitive advantage. Strategy Formulation Strategy formulation is almost always critical to the success of a strategy. Walmart discovered this when it opened stores in Japan. Although Walmart thrived in many countries on its reputation for low-cost items, Japanese consumers associated low cost with low quality, causing Walmart to rethink its strategy in the Japanese market. To formulate an effective strategy, senior managers must take into account the core competencies of the organizations, and they must scan the environment. They must determine what competitors are doing, or planning to do, and take that into account. They must critically examine other factors that could have either positive or negative effects. This is sometimes referred to as the SWOT analysis (strengths, weaknesses, opportunities, and threats). Strengths and weaknesses have an internal focus and are typically evaluated by operations people. Threats and opportunities have an external focus and are typically evaluated by marketing people. SWOT is often regarded as the link between organizational strategy and operations strategy. An alternative to SWOT analysis is Michael Porter’s five forces model, which takes into account the threat of new competition, the threat of substitute products or services, the bargaining power of customers, the bargaining power of suppliers, and the intensity of competition. In formulating a successful strategy, organizations must take into account both order qualifiers and order winners. As stated earlier, characteristics such as price, delivery reliability, delivery speed, and quality can be order qualifiers or order winners. Thus, quality may be an order winner in some situations, but in others only an order qualifier. Over time, a characteristic that was once an order winner may become an order qualifier. Obviously, it is important to determine the set of order qualifier characteristics and the set of order winner characteristics. It is also necessary to decide on the relative importance of each characteristic so that appropriate attention can be given to the various characteristics. Marketing must make that determination and communicate it to operations. Environmental scanning is the monitoring of events and trends that present either threats or opportunities for the organization. Generally, these include competitors’ activities; changing consumer needs; legal, economic, political, and environmental issues; the potential for new markets; and the like. Another key factor to consider when developing strategies is technological change, which can present real opportunities and threats to an organization. Technological changes occur in products (highdefinition TV, improved computer chips, improved cellular telephone systems, and improved designs for earthquake-proof structures); in services (faster order processing, faster delivery); and in processes (robotics, automation, computer-assisted processing, point-of-sale scanners, and flexible manufacturing systems). The obvious benefit is a competitive edge; the risk is that incorrect choices, poor execution, and higher-than-expected operating costs will create competitive disadvantages. Important factors may be internal or external. The following are key external factors: 1. Economic conditions. These include the general health and direction of the economy, inflation Page 35 and deflation, interest rates, tax laws, and tariffs. 2. Political conditions. These include favorable or unfavorable attitudes toward business, political stability or instability, and wars. 3. Legal environment. This includes antitrust laws, government regulations, trade restrictions, minimum wage laws, product liability laws and recent court experience, labour laws, and patents. 4. Technology. This can include the rate at which product innovations are occurring, current and future process technology (equipment, materials handling), and design technology. 5. Competition. This includes the number and strength of competitors, the basis of competition (price, quality, special features), and the ease of market entry. 6. Customers. Loyalty, existing relationships, and understanding of wants and needs are important. 7. Suppliers. Supplier relationships, dependability of suppliers, quality, flexibility, and service are typical considerations. 8. Markets. This includes size, location, brand loyalties, ease of entry, potential for growth, long-term stability, and demographics. The organization also must take into account various internal factors that relate to possible strengths or weaknesses. Among the key internal factors are the following: 1. Human resources. These include the skills and abilities of managers and workers, special talents (creativity, designing, problem solving), loyalty to the organization, expertise, dedication, and experience. 2. Facilities and equipment. Capacities, location, age, and cost to maintain or replace can have a significant impact on operations. 3. Financial resources. Cash flow, access to additional funding, existing debt burden, and cost of capital are important considerations. 4. Products and services. These include existing products and services, and the potential for new products and services. 5. Technology. This includes existing technology, the ability to integrate new technology, and the probable impact of technology on current and future operations. 6. Other. Other factors include patents, labour relations, company or product image, distribution channels, relationships with distributors, maintenance of facilities and equipment, access to resources, and access to markets. After assessing internal and external factors and an organization’s distinctive competence, a strategy or strategies must be formulated that will give the organization the best chance of success. Among the types of questions that may need to be addressed are the following: What role, if any, will the internet play? Will the organization have a global presence? To what extent will outsourcing be used? What will the supply chain management strategy be? To what extent will new products or services be introduced? What rate of growth is desirable and sustainable? What emphasis, if any, should be placed on lean production? How will the organization differentiate its products and/or services from competitors’? The organization may decide to have a single, dominant strategy (e.g., be the price leader) or have multiple strategies. A single strategy would allow the organization to concentrate on one particular strength or market condition. On the other hand, multiple strategies may be needed to address a particular set of conditions. Many companies are increasing their use of outsourcing to reduce overhead, gain flexibility, and take advantage of suppliers’ expertise. Amazon provides a great example of some of the potential benefits of outsourcing as part of a business strategy. Growth is often a component of strategy, especially for new companies. A key aspect of this strategy is the need to seek a growth rate that is sustainable. Page 36 Companies increase their risk of failure not only by missing or incomplete strategies; they also fail due to poor execution of strategies. And sometimes they fail due to factors beyond their control, such as natural or human-made disasters, major political or economic changes, or competitors that have an overwhelming advantage (e.g., deep pockets, very low labour costs, less rigorous environmental requirements). A useful resource on successful business strategies is the Profit Impact of Market Strategy (PIMS) database (www.pimsonline.com). The database contains profiles of over 3,000 businesses located primarily in the United States, Canada, and western Europe. It is used by companies and academic institutions to guide strategic thinking. It allows subscribers to answer strategy questions about their business. Moreover, they can use it to generate benchmarks and develop successful strategies. Supply Chain Strategy A supply chain strategy specifies how to cooperate with the organization’s supply chain (including suppliers, distributors, and customers) to achieve supply chain goals and to be competitive. The supply chain strategy should be aligned with the business strategy. If it is well executed, it can create value for the organization. It establishes how the organization should work with suppliers and policies relating to customer relationships and sustainability. Some Supply Chain Strategies There are many different strategies a business organization can choose from. Here is a sample of some of those strategies: Responsive/agile. A flexible supply chain that has the ability to quickly respond to changes in product requirements or volume of demand, as well as adapt to supply chain disruptions. Lean supply chain. Focused on eliminating non-value-added activities to create an efficient, lowcost supply chain (more in Chapter 14). Near-sourcing. Using nearby suppliers shortens the supply chain, reducing transportation time and cost, reducing supply chain inventory, reducing the risk of disruptions, and increasing responsiveness. Top management has certain strategic responsibilities that have a major impact on the success not only of supply chain management but also of the business itself. These strategies include: Supply chain strategy alignment. Aligning supply and distribution strategies with organizational strategy and deciding on the degree to which outsourcing will be employed. Network configuration. Determining the number and location of suppliers, warehouses, production/operations facilities, and distribution centres. Information technology. Integrating systems and processes throughout the supply chain to share information, including forecasts, inventory status, tracking of shipments, and events. This is often more difficult to achieve with small suppliers than with large suppliers.. Products and services. Making decisions on new product and services selection and design. Capacity planning. Assessing long-term capacity needs, including when and how much will be needed and the degree of flexibility to incorporate. Strategic partnerships. Partnership choices, level of partnering, and degree of formality. Distribution strategy. Deciding whether to use centralized or decentralized distribution, and deciding whether to use the organization’s own facilities and equipment for distribution or to use third-party logistics providers. Uncertainty and risk reduction. Identifying potential sources of risk and deciding the amount of risk that is acceptable. For an example of a supply chain strategy, see the “ in Action. Dollarama Supply Chain Strategy” OM Page 37 OM in ACTION Dollarama Supply Chain StrategyA kevin brine/Shutterstock Dollarama is a Canadian dollar store retail company based in Montreal. It has become a very popular Canadian retailer of products priced at $4 or less since 2009. There are currently 1,420 privately owned stores in Canada, and the goal is to open 2,000 more Dollarama stores by 2031. Dollarama’s approach has been based on direct sourcing; That is, they obtain the majority of their products directly from vendors, and this has become a competitive advantagefor this company. Direct sourcing enables companies to improve and broaden the product range quickly while retaining industry leading margins. Dollarama was supplied from about 1,350 different vendors in 2020, and their top 10 vendors provided them with 25 percent of their inventory. This diversification of sourcing has enabled Dollarama to have a wide range of products to sell and has reduced supply chain vulnerabilities and interruptions. The company’s philosophy is not to have a long term contracts with the vendors, but rather their relations are on purchase order basis. This policy provided the company a great flexibility and leeway if the vendor does not fulfill its commitments. The policy has worked well for the company to reduce dependence on a particular source and delays. Significant amount of the items sold at Dollarama is imported from China, but their sourcing strategy is based on a combination of imported goods from over 25 countries around the world. About 45 percent of the items sold come from North America, and another 25 percent come from many other countries. The diversity of their vendor base, as well as their sourcing strategy, decreases supply chain dependencies and possible disruptions. The key tactical and operational responsibilities related to managing the supply chain are outlined in Figure 2-2. FIGURE 2-2 Key tactical and operational responsibilities related to managing the supply chain Tactical Responsibilities Forecasting: Prepare and evaluate forecasts. Sourcing: Choose suppliers and some make-or-buy decisions. Operations planning: Coordinate the external supply chain and internal operations. Managing inventory: Jointly decide with suppliers where in the supply chain to store the various types of inventory (raw materials, semi-finished goods, finished goods). Transportation planning: Match capacity with demand. Collaborating: Work with supply chain partners to coordinate plans. Operational Responsibilities Scheduling: Short-term scheduling of operations and distribution. Receiving: Management of inbound deliveries from suppliers. Transforming: Conversion of inputs into outputs. Order fulfilling: Linking production resources and/or inventory to specific customer orders. Managing inventory: Maintenance and replenishment activities. Shipping: Management of outbound deliveries to distribution centres and/or customers. Information sharing: Exchange of information with supply chain partners. Controlling: Control of quality, inventory, and other key variables and implementing corrective action, including variation reduction, when necessary. Global Strategy Page 38 As globalization increased, many companies realized that strategic decisions with respect to globalization must be made. Global strategies have two different aspects. One relates to where parts or products are made, or where services such as customer support are performed. The other relates to where products or services are sold. With wages and standards of living increasing in countries such as China and India, new market opportunities present themselves, requiring wellthought-out strategies to take advantage of those potential opportunities while minimizing any associated risks. Global strategy also helps companies to develop and change their status from international or multinational to global. The international company concentrates on domestic markets with some overseas sales of locally produced products. The multinational company expands operations into many more overseas countries, with some product or service modifications to satisfy its specific multinational customers’ requirements. In these companies, the domestic market is still their main target. A global strategy, on the other hand, moves the company toward standardization of its products around the world to take advantage of economies of scale with efficient operations. Global strategy allows innovations and decisions made at headquarters to be implemented around the world (e.g., IKEA, PepsiCo, and Starbucks). Tim Hortons opened its first restaurant in Shanghai, China, in 2019 offering not only many of its classic food and beverage products but also some new food and beverages unique to the market. Imaginechina Limited/Alamy Stock Photo Companies must face several issues when contemplating a global strategy. First, what works in one country or region will not necessarily work in another, and strategies must be carefully crafted to take these variabilities into account. Second, there may be a threat of political or social upheaval. Third, coordinating and managing far-flung operations is difficult. Sustainability Strategy Society is placing increasing emphasis on corporate sustainability practices in the form of governmental regulations and interest groups. For these and other reasons, business organizations are or should be devoting attention to sustainability goals. To be successful, they will need a sustainability strategy. Sustainability strategy refers to the plans developing a sustainability vision to the level of organizational governance, which includes formulating goals for products and services, processes, and the entire supply chain; measuring achievements; and striving for improvements to achieve sustainability goals. As an example, the IKEA sustainability strategy is a circular supply chain, that means designing the products from the beginning stage to be recycled, repaired, reused, resold, and repurposed with the aim of minimizing waste sent to landfill (see as a new raw material. FIGURE 2-3 IKEA's circular supply chain Figure 2-3). In a circular supply chain, waste is considered Source: https://www.supplychaindive.com/news/IKEA-Circular-Supply-Chain-Waste-Hierarchy/519481/ 2.4 Operations Strategy Page 39 LO3 Discuss operations strategy and strategic operations management, and explain operations strategy formulation and generic operations strategies. The operations function can play a proactive role in strategic planning by helping shape the operations strategy (as opposed to the reactive role of just fixing operations problems). Operations strategy comprises a set of well-coordinated policies, objectives, and action plans, directly affecting the operations function, which is aimed at securing a long-term sustainable advantage over the competition.5 Table 2-5 provides a comparison of an organization’s mission, its overall strategy, and its operations strategy, tactics, and operations. TABLE 2-5 Comparison of mission, organization strategy, and operations strategy The overall Management Time Level Horizon Mission Top Long Broad Low Survival, profitability Strategy Senior Long Broad Low Growth rate, market Scope Level of Detail Relates to organization share Operations Strategic Senior Moderate Broad Low to long Product design, choice of location, choice of technology, new facilities Tactical Middle Moderate Moderate Moderate Employment levels, output levels, equipment selection, facility layout Operational Low Short Narrow High Scheduling personnel, adjusting output rates, inventory management, purchasing In order to formulate an operations strategy, the operations function has to cooperate with all of the other functions of the business to collectively monitor the external markets. For example, marketing should be aware of competitors’ new product development and customers’ expectations in the product markets, and engineering/R&D should be aware of new processing technologies in the technology markets. The role of operations should be identified. Usually, operations’ objectives/performance measures are determined in terms of competitive priorities such as cost (e.g., unit cost, labour productivity, inventory turnover), quality (e.g., percentage of products defective, cost of quality), delivery (e.g., percentage of on-time deliveries, lead time), and flexibility (e.g., response to product/quantity changes). As mentioned earlier, trade-offs must be made among these priorities because operations cannot excel in all of them simultaneously. For example, a flexible operation cannot produce the products at minimum cost. For an example of an operations strategy, see the Reconciliation Strategy” OM in Action. “Canada Post and Its New Indigenous and Northern OM in ACTION Canada Post and Its New Indigenous and Northern Reconciliation StrategyB Philip Lange/Shutterstock Canada Post is a large corporation with over 60,000 employees. In 2020, Canada Post decided to make some changes to their operation by introducing a new strategy for Indigenous reconciliation. The new operation strategy includes providing some communities with improved existing postal services and providing full service to new ones. The second part of the strategy is to create new procurement policies for Indigenous Peoples through changing the landscape of their relations with Indigenous-owned companies to create apprenticeship, training, and subcontracting opportunities. Another key aspect of the new strategy is to work with its unions to improve retention and recruitment programs to allow for many more employment opportunities for Indigenous Peoples at Canada Post. Finally, they plan to unite and collaborate with Indigenous community leaders as well as law enforcement to reduce the amount of non-mailable matter, such as alcohol and illicit drugs, that enter these communities. Operations strategy can have a major influence on the competitiveness of an organization. If it Page 40 is well designed and well executed, there is a good chance the organization will be successful; if it is not well designed or well executed, it is far less likely that the organization will be successful. Strategic Operations Management Decision Areas Operations management people play a strategic role in many strategic decisions in a business organization. Table 2-6 highlights some key decision areas. Notice that most of the decision areas have cost implications. TABLE 2-6 Strategic operations management decisions Decision Area What the Decisions Affect 1. Product and service design Costs, quality, and environmental issues 2. Capacity Cost structure, flexibility 3. Process selection and layout Costs, flexibility, skill level needed, capacity 4. Work design Quality of work life, employee safety, productivity 5. Location Costs, visibility 6. Quality Ability to meet or exceed customer expectations 7. Inventory Costs, shortages 8. Maintenance Costs, equipment reliability, productivity 9. Scheduling Flexibility, efficiency 10. Supply chains Costs, quality, agility, shortages, vendor relations 11. Projects Costs, new products, services, or operating systems 1. Product and service design. The challenge of operations management increases as the variety Page 41 of products or services and the rate of new product or service introduction increase. These require flexible operations systems. Products designed for easy manufacturing and assembly increase operations’ strength. 2. Capacity. This decision is related to systematic determination of facility and major machine/equipment requirements to meet long-term demand for goods and services. The main issue is whether and how to change the capacity in anticipation of future demand. Capacity underutilization or shortage affects operating/opportunity costs. Long-term capacity decisions relate to size of plants and major equipment (which affect economies of scale and unit production costs) increase operations’ strength. 3. Process selection and layout design. The production process type determines the appropriate technologies and degree of automation. In-house process technology knowledge, using new/efficient technologies, and a good facility layout are important for operations’ strength. 4. Work design. This decision is related to determine work/job content and work method, work environment/conditions, time standards, and compensation. The objectives of work/job design include productivity, safety, and quality of work life. Organizational learning and flexible organizational structure also play important roles in gaining competency. 5. Location. The number and location of facilities and distribution centres influence the operations and marketing strengths of the organization and have a significant impact on competitive advantage and operations’ strength. 6. Quality. Product quality is determined during the design and production stages. Conforming to specifications during production requires quality planning, control, and improvement. The tools that can be used include statistical process control and continuous improvement/Six Sigma. A major decision is whether every employee is to be responsible for quality. 7. Inventory.Inventory decisions in organizations are concerned with planning and controlling inventories (how much and when to order), which can be especially critical for the successful operation of most organizations. Poor inventory management holds operations back and diminishes customer satisfaction, in addition to costing money. 8. Maintenance. This decision encompasses all the activities that relate to keeping facilities and equipment in good working order and making necessary repairs when breakdowns occur so that the system can perform as intended. One of the major decisions is whether employees are given greater responsibility for quality, productivity, and the general functioning of the system. 9. Scheduling. This decision includes planning and control (including forecasting, material requirements planning, and scheduling), using a software program for planning and control, whether to use just-intime production, operations policies, and the production/inventory strategies used (make-to-stock, make-to-order, etc.). 10. Supply chains. Supply chains are the lifeblood of any organization. They connect suppliers, producers, and final customers in a network that is essential to the creation and delivery of goods and services. V ertical integration is ownership of a major part or the whole of a supply chain. Outsourcing is letting a supplier perform some of the production/service function, by buying goods or services instead of producing or providing them in-house (called insourcing). Cost, coordination, and control are the important decision factors. Moreover, the two extremes of the supplier relationship are transactional arm’s length and cooperative close relationships (i.e., partnership). This decision also determines how the quality of purchased goods will be assured: Which transportation modes for delivery should be selected? Will we work with a supplier to supervise/control its production processes, or inspect the incoming parts? The purchasing agent’s knowledge and effective performance are important for operations’ strength. 11. Projects. Project decisions in organizations are concerned with deciding which projects to be selected and implemented. This involves factors such as budget, availability of personnel with appropriate knowledge and skill, cost–benefit considerations, financial benefits (e.g., return on investment and net present value), and how the project will contribute to the company’s strategy. Project decisions have a significant impact on competitive advantage and operations’ strength. For an example of operations strategic decision areas, see the Decision Areas” OM in Action. “Nike’s 10 Operations Strategic Page 42 OM in ACTION Nike’s 10 Operations Strategic Decision Areas igorPHOTOserg/Shutterstock Nike, Inc. is a multinational corporation and the world’s largest manufacturer and supplier of athletic apparel. The company designs and manufactures apparel, athletic footwear, sport equipment, and accessories. The following 10 strategic decision areas are related to Nike'’s management of its operations, ensuring they are run efficiently and effectively and are aligned with the company’s goals and objectives. Nike’s 10 Operations Strategic Decision Areas Good and Nike’s products and service designs are aligned with its organizational goals and Services Design capabilities and based on current customers’ preferences and advanced technology. Nike’s 10 Operations Strategic Decision Areas Quality Nike emphasizes quality, so it uses total quality management (TQM) in its Management equipment, production processes, and products. Process and Nike focuses on making its production process more effective and efficient Capacity Design through employing simpler working methods and applying continuous improvement strategies. Location Strategy Nike’s production facility locations are selected based on optimizing costs, efficiency, and being close to target markets. Nike’s sports shoe suppliers are in Southeast Asia because of lower labour costs. Layout Design Nike uses layout design only for its owned facilities and offices. The goal of layout and Strategy design is to facilitate employee movement and optimize the workflow based on capacity, operators, machinery, technology, and inventory requirements. Job Design and Nike implements job evaluations for its employees’ job assignments to ensure Human Resources individuals are aligned with their jobs. Moreover, Nike uses internal leadership development, coaching, and mentoring to maintain adequate human resources, Supply Chain Nike’s excellent reputation for global supply chain management is earned by Management implementing automation and optimizing the transport distances among suppliers, distributors, production facilities, and retailers. Inventory Nike’s approach is to minimize inventory costs, which involves continuously Management managing and tracking the inventory throughout the supply chain to the distributors and retailers. Scheduling Nike’s scheduling decisions are designed to maximize resource use through automation. Nike’s corporate office schedules are standardized, while schedule and supply chain adjustments are made according to the conditions of the market. Maintenance Nike maintenance approach is to focus on ensuring adequate quantities of all of its resources, such as human resources (HR), equipment, and facilities. It continuously implements recruitment programs to support HR needs as well as reward programs to maximize retention of employees. Source: Edward Ferguson. “Nike Inc. Operations Management: 10 Decisions, Productivity,” Panmore Institute, June 20, 2023. https://panmore.com/nike-inc-operations-management-10-decisions-areas-productivity. Table 2-7 lists examples of To be effective, strategies and core competencies need to be aligned. operations strategies and companies that have successfully employed those strategies. TABLE 2-7 Examples of operations strategies Organization Strategy Operations Strategy Examples of Companies Organization Operations Strategy Examples of Companies Low price Low cost Walmart, No Frills Responsiveness Short processing time On-time delivery McDonald’s, UPS, FedEx, Domino’s Strategy Pizza, Uber, Amazon Differentiation: High High-performance design and/or high- Lexus: consistent quality TV: Sony, quality quality processing Consistent quality Samsung, LG Differentiation: Innovation 3M, Apple, Google Flexibility Volume Toyota Supermarkets (additional Newness Differentiation: Variety Differentiation: checkouts) Superior customer service Amazon, IBM Convenience Supermarkets, dry cleaners Mall stores Service Differentiation: Location Service stations Banks, ATMs Most of these operations strategic decision categories are described in detail later in the textbook. The following steps can be used to formulate an operations strategy. Page 43 Formulation of an Operations Strategy 1. Link the organizational goals (e.g., becoming a leader in an industry) to the operations strategy. Determine operations requirements of the organizational goals. 2. Categorize/segment the customers into types. For example, major customers (with whom a closer relationship is desirable) and others (with whom a transactional arm’s length relationship is adequate). For each category, determine which of the four competitive priorities (cost, quality, delivery, and flexibility) should be emphasized. 3. Group product lines into types. For example, classify the product lines into low volume and high volume. 4. Conduct an operations audit. This should determine the strengths/weaknesses of the current operations strategy in each of the nine strategic decision categories. Also, for each customer category/segment, assess the relative standing of products (relative to desired competitive priorities) against those of the most relevant competitors. 5. For a multi-plant corporation, assess the degree of focus at each plant (a focused plant is more efficient). Use the product–process matrix to detect the degree of congruence between a product line and its production process. For example, a low volume–high variety product line should be produced using a job shop process. 6. Develop an operations strategy. This might include reallocating product lines to plants if necessary. For each of the nine strategic decision categories, state the objectives, policies, and action plans. Deploy these policies and action plans. Generic Operations Strategies Generic operations strategies are theme-based operations improvement programs and plans, such as just-in-time production and total quality management or continuous improvement. These are generic because they have been frequently used irrespective of the market conditions and competitive situation. However, if every company in an industry pursues the same generic strategy, every company becomes more efficient or more effective without gaining competitive advantage. Therefore, these are, strictly speaking, not strategies, though they are commonly considered so. The popular generic operations strategies have been changing over time. To illustrate, the generic operations strategies some Japanese manufacturing companies have used since World War II include the following: Low labour-cost strategy. Immediately after the war, they exploited the (then) inexpensive labour pool. Scale-based strategy. During the 1960s, they used capital-intensive methods to achieve higher labour productivity and lower unit costs. Focused factories strategy. During the 1970s, they used smaller factories that focused on narrow product lines to take advantage of specialization and achieve higher quality. Flexible factories strategy. During the 1980s, they reduced the time needed to add new product and process designs. They used flexible equipment that allowed volume and design changes, as well as product variety. They also continued to stress quality. Continuous improvement strategy. In the 1990s, they introduced new product features and continuous improvement of both products and processes. Another generic strategy used by some organizations in the 1990s was business process re-e Page 44 ngineering (BPR). This is a radical process redesign that involves process reorientation, breaking up functional silos, and integrating operations into customer-focused processes. In Canada, Nova Scotia Power was quick to adopt BPR. Nova Scotia Power, just after privatization in the early 1990s, was one of the first companies in Canada to implement BPR. One of the changes was combining the jobs of meter reader, meter installer (who replaced broken meters), and bill collector (who disconnected service because of an overdue account). The new customer service field representative (CSFR) required technical training to work with live electricity! Overall BPR initiatives allowed NS Power to reduce its employment by 400 jobs. However, the CSFR job no longer exists. NS Power has now grown into an international power company called Emera.6 volkovslava/Shutterstock Another generic strategy related to BPR occurred just before the year 2000, when many organizations changed their legacy computer systems and installed enterprise resource planning (ERP) software. ERP automates business processes and can reduce cost and data entry errors, but it requires data to be entered in a central database as soon as a transaction occurs anywhere in the organization. Two factors that tend to have generic strategic operations importance relate to quality and time. We will briefly describe two quality and time strategies that are still popular. Quality-Based Strategy A quality-based strategy focuses on improving the quality of an organization’s goods or services. Quality is a factor in both attracting and retaining customers. Quality-based strategies may be motivated by a variety of factors. They may reflect an effort to overcome an image of poor quality, a desire to catch up with the competition, a desire to maintain an existing image of high quality, or some combination of these and other factors. Interestingly enough, quality-based strategies can be part of another strategy such as cost reduction, productivity improvement, or time reduction, all of which benefit from higher quality. Recently, some organizations are using a quality improvement initiative called Six Sigma, which employs more advanced statistical methods than continuous improvement, as well as the BPR approach. Chapter 9 and Chapter 10 cover more details of quality and Six Sigma. Time-Based Strategy A time-based strategy focuses on reducing the time required to accomplish various activities (e.g., develop new products and market them, respond to a change in customer demand). By doing so, organizations seek to gain a competitive advantage over rivals that take more time to accomplish the same tasks. Also, costs are generally lower, productivity is higher, and quality tends to be higher. Just-intime production is a special case. Organizations have achieved time reduction in some of the following: Planning time. The time needed to react to a competitive threat, to develop strategies and select tactics, to approve proposed changes to facilities, to adopt new technologies, and so on. Product/service design time. The time needed to develop and market new or redesigned products or services. Processing time. The time needed to produce goods or provide services. This can involve scheduling, repairing equipment, methods used, inventories, quality, training, and the like. Changeover time. The time needed to change from producing one type of product or service to another. This may involve new equipment settings and attachments, different methods, equipment, schedules, or materials. Delivery time. The time needed to fill orders. Response time for complaints. These might be customer complaints about quality, timing of deliveries, and incorrect shipments. These might also be complaints from employees about working conditions (e.g., safety, lighting, heat or cold), equipment problems, or quality problems. An example of a Canadian company using a time-based strategy is StandardAero, based in Winnipeg. By redesigning its processes into U-shaped cells, and controlling the activities using a visual system, StandardAero performs repairs/overhauls of small airplane engines in only two weeks, much faster than its competitors. More on just-in-time and lean production appears in Chapter 14. Page 45 Agile operations is a strategic approach for competitive advantage that emphasizes the use of flexibility to adapt and prosper in an environment of change. Agility involves a blending of several distinct competencies such as cost, quality, and reliability along with flexibility. Processing aspects of flexibility include quick equipment changeovers, scheduling, and innovation. Product or service aspects include varying output volumes and product mix. It is essential for marketing and operations personnel to collaborate on strategy formulation to ensure that the buying criteria of the most important customers in each market segment are addressed. Successful agile operations requires careful planning to achieve a system that includes people, flexible equipment, and information technology. Reducing the time needed to perform work is one of the ways an organization can improve a key metric: productivity, which we discuss in the next section. 2.5 Implications of Organization Strategy for Operations and Supply Chain Management LO4 Explain implications of organization strategy for operations and supply chain management. Organization strategy has a major impact on operations and supply chain management strategies. For example, organizations that use a low-cost, high-volume strategy limit the amount of variety offered to customers. As a result, variations for operations and the supply chain are minimal, so they are easier to deal with. Conversely, a strategy to offer a wide variety of products or services, or to perform customized work, creates substantial operational and supply chain variations and, hence, more challenges in achieving a smooth flow of goods and services throughout the supply chain, thus making the matching of supply to demand more difficult. Similarly, increasing service reduces the ability to compete on price. Table 2-8 provides a brief overview of variety and some other key implications. TABLE 2-8 Organization strategies and their implications for operations and supply chain management Organization Strategy Implications for Operations and Supply Chain Management Low price Requires low variation in products/services and a high-volume, steady flow of goods results in maximum use of resources through the system. Standardized work, material, and inventory requirements. High quality Entails higher initial cost for product and service design, and process design, and more emphasis on assuring supplier quality. Quick response Requires flexibility, extra capacity, and higher levels of some inventory items. Newness/innovation Entails large investment in research and development for new or improved products and services plus the need to adapt operations and supply processes to suit new products or services. Product or service variety Requires high variation in resource and more emphasis on product and service design; higher worker skills needed, cost estimation more difficult; scheduling more complex; quality assurance more involved; inventory management more complex; and matching supply to demand more difficult. Organization Strategy Implications for Operations and Supply Chain Management Sustainability Affects location planning, product and service design, process design, outsourcing decisions, returns policies, and waste management. 2.6 Transforming Strategy into Action: The Balanced Scorecard LO5 Describe transforming strategy into action: the balanced scorecard. Strategic planning is the process of determining a strategy and implementing it through allocation of resources and action plans. More progressive organizations perform strategic planning on a regular basis, usually annually. Briefly, strategic planning starts with top management soliciting the performance of current Page 46 strategy from stakeholders (department managers and employees, shareholders, customers, suppliers, and society) and commissioning a market research study of the industry and where it is headed in the next five years or so. Then, the management team may form/adjust the organization’s mission and vision (based on the organization’s values), determine a set of goals and objectives, and brainstorm and evaluate alternative ways (strategies) to achieve them. Finally, the chosen strategy is implemented by determining a set of action plans at the department level. The balanced scorecard (BSC) is a top-down management strategic planning system that organizations can use to clarify their vision and strategy and transform them into action.7 It was introduced in the early 1990s by Robert Kaplan and David Norton, and it has been revised and improved since then. The idea was to move away from a purely financial perspective of the organization and integrate other perspectives such as customers, internal business processes, and learning and growth. Using this approach, managers develop objectives, metrics, and targets for each objective, and initiatives to achieve objectives, and they identify links among the various perspectives. The balanced scorecard is a useful tool for managers to communicate with their organization and align daily work, products, services, and projects with their strategy. Progress is monitored and measured to improve strategic performance results. Figure 2-4 illustrates the conceptual framework of this approach. Many organizations employ this or a similar approach. FIGURE 2-4 The balanced scorecard Source: Adapted from Robert S. Kaplan and David Norton, “Using the Balanced Scorecard as a Strategic Management System.” Harvard Business Review (January–February 1996): 76. Figure 2-4, the four perspectives are intended to balance not only financial and As seen in nonfinancial performance, but also internal and external performance, as well as past and future performance. This approach can also help organizations focus on how they differ from the competition in each of the four areas if their vision is realized. focal points. Table 2-9 has some examples of factors for key TABLE 2-9 Balanced scorecard factors examples Suppliers Factors Suppliers Delivery performance Suppliers Factors Quality performance Number of suppliers Supplier locations Duplicate activities Internal Processes Bottlenecks Automation potential Turnover Employees Job satisfaction Learning opportunities Delivery performance Customers Quality performance Satisfaction Retention rate Although the balanced scorecard helps focus managers’ attention on strategic issues and the implementation of strategy, it is important to note that it has no role in strategy formulation. Page 47 Moreover, this approach pays little attention to suppliers and government regulations, and community, environmental, and sustainability issues are missing. These are closely linked, and business organizations need to be aware of the impact they are having in these areas and respond accordingly. Otherwise, organizations may be subject to attack by pressure groups and risk damage to their reputation. 2.7 Productivity LO6 Define and measure productivity, explain several factors that affect productivity, describe why it is important to organizations, and discuss improving productivity. One of the primary responsibilities of an operations manager is to achieve productive use of an organization’s resources. The term productivity is used to describe this. Productivity measures output (goods and services) per unit input (machine, labour, materials, energy) used to produce it. It is usually expressed as the ratio of output to input: (2-1) Output Productivity = Input Although productivity is important for all business organizations, it is particularly important for organizations that use a strategy of low cost, because the higher the productivity, the lower the cost of the output. A productivity ratio can be computed for a single operation, a department, an organization, or an entire country. In business organizations, productivity ratios are used for planning workforce requirements, scheduling equipment, financial analysis, and other important tasks. Measuring Productivity Productivity measures can be based on a single input (partial productivity), on more than one input Table 2-10 lists different types of (multi-factor productivity), or on all inputs (total productivity). inputs for these productivity measures. The choice of productivity measure depends primarily on the purpose of the measurement. If the purpose is to track improvements in labour productivity, then labour becomes the obvious input. TABLE 2-10 Different types of inputs for productivity measures Partial Output Output Output Output Labour Machine Material Energy Multi-factor Output Output Labour + Machine Labour + Material + Energy Total Goods or services produced All inputs used to produce them Partial measures are often of greatest use in operations management. Table 2-11 provide some examples of partial productivity measures and Table 2-12 displays some examples of partial productivity measures at the Nike Inc. TABLE 2-11 Some examples of partial productivity measures Labour productivity Units of output per labour hour Units of output per shift Value-added per labour hour Dollar value of output per labour hour Machine productivity Units of output per machine hour Dollar value of output per machine hour Material productivity Units of output per unit material input, for example, kilometres per litre. Note: Litres per 100 km is the inverse of the productivity measure, but it is still used to measure productivity. Dollar value of output per unit material input Energy productivity Units of output per kilowatt-hour Dollar value of output per kilowatt-hour Page 48 TABLE 2-12 Examples of partial productivity measures at the Nike Inc. Business Area Productivity Criteria Nike’s retail stores Revenue per square foot Nike suppliers Pair of shoes per hour Inventory personnel Items per day Nike’s corporate office Documents per day Source: Edward Ferguson. “Nike Inc. Operations Management:10 Decisions, Productivity.” Panmore Institute, February 7, 2017. https://panmore.com/nike-inc-operations-management-10-decisions-areas-productivity. The unit of output used in a productivity measure depends on the type of job performed. The following are different examples of labour productivity: Square metres of carpet installed = Square metres of carpet installed per labour hour Labour hours Number of of f ices cleaned = Number of of f ices cleaned per shif t Number of shif ts Board f eet of lumber cut = Board f eet of lumber cut per week (Board f oot = Volume of lumber that cover Number of weeks Similar examples can be listed for machine productivity (e.g., the number of pieces produced by a machine per hour). EXAMPLE 2-2 Determine the productivity for these cases: a. Four workers installed 720 square metres of carpet in eight hours. b. A machine produced 68 usable (i.e., good quality) pieces of a part in two hours. SOLUTION a. Square metres of carpet installed Productivity = Labour hours worked 720 square metres = 4 workers × 8 hours 720 square metres = 32 worker hours = b. 22.5 square metres/worker hour Usable pieces Productivity = Production time 68 pieces = 2 hours = 34 pieces/hour The inputs in a multi-factor productivity measure should have a common unit of measurement, such as dollars. For example: (2-2) Quantity of production Labour cost ($) + Materials cost ($) + Machine overhead ($) Page 49 EXAMPLE 2-3 Determine the multi-factor productivity for the combined inputs of labour, materials, and machine time using the following data: Output: 7,040 units Input costs: Labour (line and support staff, including benefits): $1,000 Materials: $520 Machine overhead: $2,000 SOLUTION Output Multi-factorproductivity = Labour + Materials + Machine overhead 7,040 units = $1,000 + $520 + $2,000 = 2 units/dollar input Even though labour cost as a proportion of total cost has been decreasing in manufacturing, labour productivity is still the main measure used to gauge the performance of individuals, processes, and plants. In addition, its use in services has been increasing as services are employing more workers. Labour productivity and average operation time for a task are inversely related. For example, if it takes an average of five minutes to produce one unit, this implies a productivity of (60 minutes per hour)/(5 minutes per unit) = 12 units per hour. Productivity measures are useful on a number of levels. For an individual, process, department, or organization, productivity measures can be used to track performance over time. This allows managers to judge performance and to decide where improvements are needed. For example, if a manager finds that productivity has slipped in a certain area, the manager can examine the factors used to compute productivity to determine what has changed and then devise a means of improving productivity in subsequent periods. Labour productivity is sometimes used in labour wage negotiations where wage raises are tied to productivity growth. Total productivity and profit of a company are directly related: (2-3) Prof it = Revenue − Total cost (2-4) Revenue Total productivity = Total cost A related measure is the rate of productivity growth. Productivity growth is the increase in productivity from the previous period to the current period relative to the productivity in the previous period. Current period productivity − Previous period productivity (2-5) Productivity growth = Previous period productivity For example, if productivity increased from 80 to 84, the growth rate would be 84 − 80 Productivity growth = = 0.05 or 5% 80 Productivity measures can also be used to judge the performance of an entire industry or a country as a whole. These productivity measures are aggregate measures. Productivity growth is a key factor in a country’s standard of living. Productivity increases add value to the economy while keeping price inflation in check. We should not confuse productivity with efficiency. Efficiency is a narrower concept that means getting the most out of a fixed set of resources; productivity is a broader concept that means better use of overall resources. For example, an efficiency perspective on mowing a lawn, if we have a hand mower, would focus on the best way to use the hand mower (e.g., follow a route that minimizes backtracking); a productivity perspective would include the possibility of using a power mower. Page 50 In essence, productivity measurements serve as scorecards of the efficient use of resources. Business leaders are concerned with productivity as it relates to competitiveness: If two companies both have the same level of output, but one requires less input because of higher productivity, that one will be able to charge a lower price and consequently increase its share of the market, or it might elect to charge the same price, thereby reaping a greater profit. The use of a mechanized rice transplanter has been proven to increase labour productivity. Umaporn Tepumong/Shutterstock Productivity Measurement of Services Service productivity is more problematic than manufacturing productivity. In many situations, it is more difficult to measure, and thus to manage, because it involves intellectual activities and a high degree of variability. Think about medical diagnoses, surgery, consulting, legal services, customer service, and computer repair work. This makes productivity improvements more difficult to achieve. Nonetheless, because service is becoming an increasingly large portion of our economy, the issues related to service productivity will have to be dealt with. It is interesting to note that government statistics normally do not include service firms. A useful measure closely related to productivity is process yield. Where products are involved, process yield is defined as the ratio of output of good product (i.e., defective product is not included) to the quantity of raw material input. Where services are involved, process yield measurement is often dependent on the particular process. For example, in a car rental agency, a measure of yield is the ratio of cars rented to cars available for a given day. In education, a measure for college and university admission yield is the ratio of student acceptances to the total number of students approved for admission. For subscription services, yield is the ratio of new subscriptions to the number of calls made or the number of letters mailed. However, not all services lend themselves to a simple yield measurement. For example, services such as automotive, appliance, and computer repair don’t readily lend themselves to such measures. Factors That Affect Productivity Numerous factors affect productivity. Generally, they are methods, capital, quality, technology, and management. A commonly held misconception is that workers are the main determinant of productivity. According to that theory, the route to productivity gains involves getting employees to work harder. However, the fact is that many productivity gains in the past have come from technological improvements. Familiar examples include the following: Drones Automation GPS devices Copiers and scanners Calculators Smartphones The Internet, search engines Computers Apps Voicemail Email 3D printers Radio frequency ID tags Software Medical imaging However, technology alone won’t guarantee productivity gains; it must be used wisely and thoughtfully. Without careful planning, technology can actually reduce productivity, especially if it leads to inflexibility, high costs, or mismatched operations. Another current productivity pitfall results from employees’ use of computers or smartphones for non-work-related activities (playing games or checking stock prices or sports scores on the Internet or smartphones, and texting friends and relatives). Beyond all of these is the dip in productivity that results while employees learn to use new equipment or procedures that will eventually lead to productivity gains after the learning phase ends. Other factors that affect productivity include the following: Standardizing processes and procedures wherever possible to reduce variability can have a significant benefit for both productivity and quality. Page 51 Quality differences may distort productivity measurements. One way this can happen is when comparisons are made over time, such as comparing the productivity of a factory now with one 30 years ago. Quality is now much higher than it was then, but there is no simple way to incorporate quality improvements into productivity measurements. Use of the Internet can lower costs of a wide range of transactions, thereby increasing productivity. It is likely that this effect will continue to increase productivity in the foreseeable future. Computer viruses can have an immense negative impact on productivity. Searching for lost or misplaced items wastes time, hence negatively affecting productivity. Scrap rates have an adverse effect on productivity, signalling inefficient use of resources. New workers tend to have lower productivity than seasoned workers. Thus, growing companies may experience a productivity lag. Safety should be addressed. Accidents can take a toll on productivity. A shortage of technology-savvy workers hampers the ability of companies to update computing resources, generate and sustain growth, and take advantage of new opportunities. Layoffs often affect productivity. The effect can be positive and negative. Initially, productivity may increase after a layoff, because the workload remains the same but fewer workers do the work— although they have to work harder and longer to do it. However, as time goes by, the remaining workers may experience an increased risk of burnout, and they may fear additional job cuts. The most capable workers may decide to leave. Labour turnover has a negative effect on productivity; replacements need time to get up to speed. Design of the workspace can impact productivity. For example, having tools and other work items within easy reach can positively impact productivity. Incentive plans that reward productivity increases can boost productivity. And there are still other factors that affect productivity, such as equipment breakdowns and shortages of parts or materials. The education level and training of workers and their health can greatly affect productivity. The opportunity to obtain lower costs due to higher productivity elsewhere is a key reason many organizations turn to outsourcing. Hence, an alternative to outsourcing can be improved productivity. Moreover, as a part of their strategy for quality, the best organizations strive for continuous improvement. Productivity improvements can be an important aspect of that approach. Improving Productivity A company or a department can take a number of key steps toward improving productivity: 1. Develop productivity measures for all operations. Measurement is the first step in managing and controlling an operation. 2. Look at the system as a whole in deciding which operations are most critical. It is overall productivity that is important. Managers need to reflect on the value of potential productivity improvements before okaying improvement efforts. The issue is effectiveness. There are several aspects of this. One is to make sure the result will be something customers want. For example, if a company is able to increase its output through productivity improvements, but then is unable to sell the increased output, the increase in productivity isn’t effective. Second, it is important to adopt a systems viewpoint: A productivity increase in one part of an operation that doesn’t increase the productivity of the system would not be effective. For example, suppose a system consists of a sequence of two operations, where the output of the first operation is the input to the second operation, and each operation can complete its part of the process at a rate of 20 units per hour. If the productivity of the first operation is increased, but the productivity of the second operation is not, the output of the system will still be 20 units per hour. 3. Develop methods for achieving productivity improvements, such as soliciting ideas from workers (perhaps organizing teams of workers, engineers, and managers), studying how other firms have increased productivity, and reexamining the way work is done. 4. Establish reasonable goals for improvement. 5. Make it clear that management supports and encourages productivity improvement. Consider incentives to reward workers for contributions. 6. Measure improvements and publicize them. Fracking productivity improvement is another example. Drilling methods have become more Page 52 effective. Drillers are now adopting a hydraulic fracturing method pioneered by companies such as Liberty Resources and EOG Resources that uses larger amounts of water and minerals. Although it is a more costly process, it has increased production rates in the first year of a well’s life, after which output tends to drop off dramatically. Processes such as these have reduced the break-even cost of producing a barrel of oil and kept profitable some acreage that drillers might otherwise have left idle. Effective management and methods result in better design, planning, and operating decisions, standardizing and improving processes, improving quality, reducing waste (as in just-in-time production), providing better layout, and using technology, equipment, and labour more effectively and efficiently. Productivity can be enhanced by the use of robotic equipment. Robots can operate for long periods with consistent precision and high speed. SasinTipchai/Shutterstock SUMMARY Competition is the driving force in many companies. They compete by emphasizing one or more competitive priorities: cost, quality, flexibility, and delivery (reliability and speed). Customers’ purchasing criteria are product and service design, quality, variety, and timeliness. To develop an effective strategy for an organization, it is essential to determine the key purchasing criteria of its customers, and to identify which are order qualifiers and which are order winners. Strategies are plans for directing the organization to achieve its mission/goals. Strategy formulation is critical because strategies provide direction for the organization, so they can play a role in the success or failure of a business organization. Mission is what the company wants to achieve, its products and services, and its markets (now and in the future, respectively). Organizations generally have overall strategies for the entire organization and functional strategies for each of the functional areas. Functional strategies are narrower in scope and should be linked to overall strategy. An operations strategy is a coordinated set of policies, objectives, and action plans for the operations function. An operations strategy can be classified into 11 strategic decision categories: product and service design, capacity, process and layout selection, work design, location, quality, inventory, maintenance, scheduling, supply chains, and projects. A supply chain strategy specifies how to cooperate with the organization’s supply chain (including suppliers, distributors, and customers) to achieve supply chain goals and to be competitive, and it should be aligned with the business strategy. Quality-based and time-based strategies are among the most widely used generic operations strategies. The balanced scorecard approach can be helpful for transforming strategies into actions and understanding the implications of organization strategy for operations management. Productivity is a measure of productive use of resources. Organizations want higher productivity because it yields higher profits and helps them become more competitive. Productivity is measured as output/input. The most common productivity measure is labour productivity (e.g., number of units produced per hour by a worker). Productivity of services is harder to measure because outputs are usually intangible and variable, and inputs are variable too. Factors affecting productivity include methods and management, equipment and technology, and labour. KEY TERMS balanced scorecard (BSC) business process re-engineering (BPR) circular supply chain competitive priorities competitiveness core competencies enterprise resource planning (ERP) environmental scanning goals key purchasing criteria mission mission statement operations strategy order qualifiers order winners outsourcing process yield productivity quality-based strategy strategic planning strategies strategy supply chain strategy sustainability strategy SWOT tactics Page 53 time-based strategy vertical integration vision SOLVED PROBLEMS Problem 1 A company that processes fruits and vegetables is able to produce 400 cases of canned peaches in one-half hour with four workers. What is its labour productivity? Solution Quantity produced Labour productivity = Labour hours 400 cases = 4 workers × 1/2 hour = 200 cases per worker hour Problem 2 A wrapping paper company produced 2,000 rolls of paper in one day. Labour cost was $160, material cost was $50, and overhead was $320. Determine the multi-factor productivity. Solution Quantity produced Multi-f actor productivity = Labour cost + Material cost + Overhead 2,000 rolls = $160 + $50 + $320 = 3.77 rolls per dollar input Problem 3 Compute the multi-factor productivity measure for an eight-hour day in which the usable output was 300 units, produced by three workers who used 600 pounds of materials. Workers have an hourly wage of $20, and material cost is $1 per pound. Overhead is 1.5 times labour cost. Solution Multi-f actor productivity = = Usable output Labour cost+Material cost+Overhead cost 300 units (3workers×8hours×$20/ hour)+(600pound×$1/ pound)+ (3workers×8hours×$20/hour×1.50) = = 300 units $480+$600+$720 0.167 units of output per dollar of input Problem 4 Page 54 A health club has two employees who work on lead generation. Each employee works 40 hours a week, and is paid $20 an hour. Each employee identifies an average of 400 possible leads a week from a list of 8,000 names. Approximately 10 percent of the leads become members and pay a one-time fee of $100. Material costs are $130 per week, and overhead costs are $1,000 per week. Calculate the multi-factor productivity (MFP) for this operation in fees generated per dollar of input. Solution (Possible leads)(No . of workers)(Fee)(Conversion percentage) MFP = Labour cost + Material cost + Overhead cost (400)(2)($100)(0.10) = $8,000 = 2(40)($20) + $130 + $1,000 = 2.93 $2,730 Problem 5 A pottery manufacturer that sells to flower shops and department stores had the following output and costs during the last three weeks. Average labour cost is $10 per hour during regular time (first 40 hours of a week) and $15 per hour during overtime (any hours in excess of 40 hours a week), and pottery clay cost was $2/kg. Calculate the multi-factor productivity for each week and comment on the results. Week 1 2 3 Units produced 1,000 1,500 1,500 No. of workers 2 2 3 Hours per week per worker 40 60 40 Material (kg) 150 250 300 Solution Multi-factor productivity = Units produced/(Labour cost + Material cost) Week Units produced Labour cost Material cost Total cost Multi-factor productivity 1 2 1,000 1,500 2 (40) ($10) = $800 $800 + 2 (20) ($15) = $1,400 3(40)($ 150 ($2) = $300 250 ($2) = $500 30 $1,100 $1,900 1,000/$1,100 = 0.91 1,500/$1,900 = 0.79 1,500/ (pots per $ input) Multi-factor productivity decreased as overtime was used in week 2, but increased as another worker was added in week 3 and no overtime was used. However, material cost increased in week 3 due to mistakes of the new worker. DISCUSSION AND REVIEW QUESTIONS 1. What is IKEAs sustainability strategy? LO1 LO3 Page 55 2. How do you use the four key purchasing criteria personally when buying goods and services? Give an example. LO1 3. The four competitive priorities are cost, quality, flexibility, and delivery. Provide a name of a company as an example of each of these priorities. LO1 4. Explain the difference between order qualifiers and order winners. Give an example. LO1 5. Explain how a company can gain a competitive advantage. 6. Name 10 ways that bank competes for customers. 7. List the 11 strategic decision categories. LO2 8. Contrast the terms strategies and tactics. LO2 9. Give an example of a policy and an action plan. 10. Describe what an operations strategy is. LO1 LO1 LO2 LO3 11. Describe how an operations strategy is formulated. LO3 12. Explain the term time-based strategy and give two examples of companies using it. LO3 13. A few years ago, Boeings strategy was focused on its 787 Dreamliner mid-to-large size plane and its ability to fly into smaller, non-hub airports. Rival European Airbuss strategy was focused on its very large A380 plane. What assumption about future demand for air travel was each company making? LO3 14. What are the strategic, tactical, and operations responsibilities in supply chain management? LO3 15. What is a circular supply chain? Give an example. LO2 16. Give an example of what Nova Scotia Power did as part of its business process re- engineering. LO3 17. Productivity should be a concern of every business organization. a. How is productivity defined? b. How are productivity measures used? c. Why is productivity important? LO6 d. What part of the organization has the primary responsibility of productivity? 18. Name some factors that can affect productivity and give an example of each that should improve productivity. LO6 19. Explain the difference between productivity and efficiency. LO6 20. A typical Japanese automobile manufacturing plant in North America produces more cars with fewer workers than a typical Big Three North American plant.8 In other words, total manufacturing labour hours per vehicle (body stamping, engine, transmission, and assembly hours) are lower for Japanese transplants (30 vs. 33 hours). What are some possible explanations for this? LO6 21. A century ago, most people worked in agriculture, but now less than 4 percent of workers work in agriculture in Canada. Yet, due to mechanization and automation, the agricultural output is much more now than a century ago. The majority of people now work in other industries. Also, the standard of living is much higher now than a century ago. Discuss the following statement: If productivity increases, fewer workers will be needed. LO6 22. Give two reasons that productivity measurement in health care (e.g., treatment of diabetes) is difficult. LO6 TAKING STOCK 1. Who needs to be involved in formulating organizational strategy? LO2 2. Name some of the competitive trade-offs that might arise in a fast-food restaurant. LO1 3. How does technology improve each of these? a. Competitiveness. b. Productivity. LO1 LO6 4. How can ethics be included in strategic planning? (Hint: See Miriam Schulman’s article on the Markkula Center for Applied Ethics at Santa Clara University website, Incorporati ng Ethics into the Organization LO2 CRITICAL THINKING EXERCISE 1. In the past, there was concern about a “productivity paradox” related to IT services. More recently, there have been few references to this phenomenon. Using the internet, explain the term productivity paradox. Why do you think that the discussion of that topic has faded? LO6 2. A company has two manufacturing plants: one in Canada, and another overseas. Both produce the same product. However, their labour productivity figures are quite different. The analyst thinks that this is because the Canadian plant uses more automated equipment for production while the overseas plant uses a higher percentage of labour. Explain how that factor can cause labour productivity measures to be misleading. Is there another way to compare the two plants that would be more meaningful? LO6 3. While it is true that increases in efficiency generate productivity increases, it is possible to get caught in an “efficiency improvement trap.” Explain what this means. LO6 4. It is common knowledge that Sam’s boss Dom has been fudging the weekly productivity figures. Several employees, including Sam, have spoken to him about this, but he continues to do it. Sam has observed a drop in morale among his coworkers due to this. Sam is thinking about sending an anonymous note to Dom’s boss. Would that be ethical? What would you do if you were Sam? LO6 PROBLEMS 1. A company produced 300 standard bookcases last week using seven workers, and Page 56 240 standard bookcases this week using five workers. In which period was labour productivity higher? Explain. Page 57 LO6 2. The manager of a crew that installs carpets has tracked the crew’s output over the past several weeks, obtaining these figures: Page 58 LO6 Week Crew Size Square Metres Installed 1 4 960 2 3 702 3 4 968 4 2 500 5 3 696 6 2 500 Calculate the labour productivity for each week. On the basis of your calculations, what can you conclude about crew size and productivity? 3. The following table shows the output of the past four weeks’ production: a) Assume a total of 40 hours of work a week. Calculate the labour productivity per hour for each week. b) Calculate the multi-factor productivity measure for each week below. Assume 40 hours of work a week and an hourly wage rate of $12. Overhead is 1.5 times weekly labour cost. Material cost is $6 per kilogram. Selling price is $140 per unit. What do the productivity figures suggest? LO6 Week Output (units) Workers Material (kg) 1 300 6 45 2 338 7 46 3 322 7 46 4 354 8 48 4. In a subassembly production line, 14 operators are producing 1,800 products in two shifts (eight hours per shift). There is a plan to install an automated tool for each station which will increase the production to 2,200 in two shifts. What will be the labour productivity after installing the new automated tools? Calculate the labour productivity growth. LO6 5. A manager checked production records and found that a worker produced 160 units while working 40 hours. In the previous week, the same worker produced 138 units while working 36 hours. Calculate the labour productivity growth. Explain. LO6 6. Teradyne assembles a large printed circuit board called a “backplane.” This product is used for communication and storage devices. A few years ago, the company’s production rate was 300 backplanes in seven days in three shifts (24 hours a day). Then, Teradyne converted its production process from batch into assembly line. The result was assembling 500 backplanes in five days in two shifts (16 hours a day). Assuming that the same number of workers worked during each shift before and after the conversion, what was the percentage growth in labour productivity? LO6 7. An operation has a 10 percent scrap rate. As a result, only 82 good pieces per hour are produced. What is the potential increase in labour productivity that could be achieved by eliminating the scrap? LO6 8. A company that makes shopping carts for supermarkets and other stores recently purchased some new equipment that reduces the labour content of the jobs needed to produce the shopping carts. Prior to buying the new equipment, the company used four workers, who produced an average of 80 carts per hour. Labour cost was $10 per hour and machine cost was $40 per hour. With the new equipment, it was possible to transfer one of the workers to another department. Machine cost increased by $10 per hour while output increased by four carts per hour. LO6 a. Calculate labour productivity before and after the new equipment. Use carts per worker per hour as the measure of labour productivity. b. Calculate the multi-factor productivity before and after the new equipment. Use carts per dollar cost (labour plus machine) as the measure. c. Comment on the changes in productivity according to the two measures. Which one do you believe is more pertinent for this situation? 9. A property title search firm is contemplating using online software to increase its search productivity. Currently, an average of 40 minutes is needed to do a title search. The researcher cost is $2 per minute. Clients are charged a fee of $400. Company A’s software would reduce the average search time by 10 minutes, at a cost of $3.50 per search. Company B’s software would reduce the average search time by 12 minutes at a cost of $3.60 per search. Which option would have the higher productivity in terms of revenue per dollar of input? LO6 10. When Henry Ford introduced moving assembly lines in his Ford Motor Company plants in 1913, productivity soared.9 An example of this is the coil line, an electrical component that makes high voltage for ignition. Before, a skilled worker took approximately 20 minutes to make a coil from start to finish. After an assembly line was set up and the job was divided into 29 different tasks performed by 29 workers, it took only approximately 13 minutes to assemble one coil. (Note: Because workers work simultaneously, approximately every 0.5 minutes a coil is produced.) LO6 a. Calculate the labour productivity before and after the conversion into an assembly line. b. Calculate the percentage increase in labour productivity due to the assembly line. 11. (i) One person using a hammer will take five days to nail new shingles onto the roof of a 300 m2 house. 12. Southwest Tube 10 (now called Webco Industries) is a fabricator of specialty tubes used in boilers and other equipment. Southwest buys the tubes in long segments and cuts, bends, cold draws, and welds the pieces to make what is needed for the products. A few years ago, Southwest Tube was facing tough competition. The prices were falling while the costs were rising. To improve productivity, consultants were brought in. They pointed out problems with labour turnover, absenteeism, weak supervision, staffing mismatch, lack of performance goals, and a dislike for the weekly rotating schedule as causes of the problem. One of the solutions tried, in addition to other improvements, was changing the work schedule to four 12-hour days followed by three days off. The productivity seemed to improve gradually. To ascertain this, the following data for two physically demanding work LO6 centres were collected starting the year before the change in work schedule. Question: Has workers’ productivity in the two work centres increased? Explain. Cold Draw Department Year Labour Output (1,000 hr) (1,000 ft) Weld Mill Department Year Labour Output (1,000 hr) (1,000 ft) Cold Draw Department Labour Output 0 228 18,269 1 234 2 3 Weld Mill Department Labour Output 0 132 22,434 19,576 1 157 34,777 183 17,633 2 102 26,715 150 18,870 3 77 25,227 13. The following data (all in billion $) were the sales and profit of Hudson’s Bay Company during a three-year period. LO6 HBC 3 2 1 Total sales & revenue 7.1 7.3 7.3 EBIT 0.13 0.17 0.18 EBIT = Earnings before interest and taxes (Hint: Inputs = Total cost = Total sales & revenue – EBIT) The following data (all in billion $) were the sales, cost of sales (which equals cost of goods sold), and operating and overhead expenses of Walmart during the same three-year period: Walmart 3 2 1 Net sales 285 256 230 Cost of sales (COS) 220 199 178 Operating, selling, general & admin costs (OSGA) 51 45 40 (Hint: Inputs = Total cost = COS + OSGA) Calculate an appropriate measure of productivity for each company and compare. Which company was more productive? Explain. 14. The following data (all in billions of dollars) were the sales and costs (excluding selling and general and administrative costs) of McDonald’s for company-operated restaurants (i.e., excluding franchise restaurants) during a three-year period. LO6 a. Calculate the labour productivity (in dollars of sales over dollars of payroll and benefits costs) and its percentage growth over time. Interpret your results. b. Calculate the multi-factor productivity (in dollars of sales over dollars of all operating costs given) and its percentage growth over time. Interpret your results. McDonald’s 1 2 3 Sales 16.6 16.6 15.5 Operating costs food & paper 5.5 5.9 5.2 Payroll & benefits 4.3 4.3 4.0 Occupancy (lease, etc) 3.9 3.8 3.5 15. The following data were the production of potash (potassium chloride, KCl), in 1,000 tonne units, and number of active mine-site employees for two mine/mill facilities of the Potash Corp (of Saskatchewan) during a four-year period. LO6 Calculate the labour productivity (in 1,000 tonnes per employee per year) and its changes over time for each facility, and interpret your results (over time and across the two facilities). Lanigan Rocanville Year Production Employees Production Employees 1 2,025 364 1,833 328 2 2,023 378 2,573 340 3 1,471 402 1,897 343 4 1,907 441 2,647 354 16. Frank Gilbreth is the founder of motion study. One of the first operations he studied was bricklaying. He noticed that there was unnecessary stooping, walking, and reaching. Also some bricks were damaged, which required the bricklayer to inspect each brick and find the better side before laying it. Stooping per brick laid was once for the mortar, and another for the brick. Gilbreth designed a non-stooping scaffolding platform that was raised by a lifting jack as work progressed up the wall so that the mortar and bricks were always within easy reach of the bricklayer. The worker could easily pick up a brick in one hand and mortar in the other. Motions per brick were reduced from 18 to 5, and average time went down from 29 seconds per brick laid to 10 seconds per brick laid. Calculate the labour productivity (expressed as bricks per minute of labour) before and after the improvement, and the percentage of increase. LO6 17. A company offers identity-theft protection. It obtains client leads from banks. Three employees work 40 hours a week on the leads, at a pay rate of $25 per hour per employee. Each employee identifies an average of 3,000 potential leads a week from a list of 5,000. An average of 4 percent actually sign up for the service, paying a one-time fee of $70. Material costs are $1,000 per week, and overhead costs are $9,000 per week. Calculate the LO6 multi-factor productivity for this operation in fees generated per dollar of input. 18. The following are some of the operating performance indicators used by Canadian Pacific Railway (CPR).11 Determine an appropriate measure of CPR’s labour (employee) productivity using some of the following indicators, and calculate it for each year. Comment on its pattern over time. LO6 Performance Indicator Year 1 Year 2 Year 3 Gross ton-miles (millions) 272,862 263,344 242,694 Train miles (thousands) 36,252 34,064 30,373 Average train length (feet) 6,682 6,935 7,217 Total employees (average) 14,604 13,858 12,082 19. A human carpet weaver takes 4,000 hours to weave a 3.6 m by 6 m area carpet, whereas a carpet weaving machine can weave the same carpet in half an hour. Calculate their respective productivity and compare. LO6 20. The following table shows data on the average number of customers processed by several bank service units each day. The hourly wage rate is $25, the overhead rate is 1.0 times labour cost, and material cost is $5 per customer. LO6 Unit Employees Customers Processed/Day A 4 36 B 5 40 C 8 60 D 3 20 a. Compute the labour productivity and the multi-factor productivity for each unit. Use an eight-hour day for multi-factor productivity. b. Suppose a new, more standardized procedure is to be introduced that will enable each employee to process one additional customer per day. Compute the expected labour and multi-factor productivity rates for each unit. MINI-CASES Page 59 Mini-Case Competing the Loblaw WayC Loblaw is Canada’s largest grocery store chain, and the Loblaw brand encompasses several sectors, including corporate and franchise supermarkets operating under 22 regional and market segment banners, baby products, pharmaceuticals, cellphones, general merchandise, financial services, and more. Some stores also sell housewares, clothing, health and beauty products, and drugs. Some stores have a gas station. Loblaw purchased Shoppers Drug Mart, Canada’s largest pharmacy chain, for $12 billion in 2014. It offers financial services, including a MasterCard, and a PC Optimum loyalty program. When Richard J. Currie was appointed president of Loblaw in 1976, Loblaw was only a regional chain (mainly in Ontario), with low profits and cash flow problems. Most store buildings were leased on a long-term basis and the company had no strategic direction. Currie closed some unprofitable stores, including those in the United States, and concentrated on maximizing sales per square foot of the other stores. Loblaw did not open new stores. Although it appeared weak to its competitors, this strategy allowed Loblaw to survive. Currie believed that Loblaw should own its stores, rather than lease them. The leases were long-term and inflexible, which frequently resulted in the company having to pay for the building well after the store was closed. Also, changing a leased building to accommodate new departments was problematic. So, Loblaw gradually reduced its leases and increased its real estate ownership. Loblaw now owns more than 70 percent of the buildings it uses. Currie also believed that controlling the buying activities and labour costs was most important. Given that cost of goods is over 90 percent of the selling price of groceries, there is not much margin for labour and overhead costs. Also, he believed that union workers were much more costly than non-union workers. Given that most stores were already unionized, the way around the low margin was to expand the high-volume large stores. Another problem in the food retailing business was that competitors competed using periodic sales (promotions), following a “high–low” pricing strategy. Currie believed that selling anything below cost was absurd, but he could not convince his competitors. He believed that customers just needed “quality products, reliably available, and priced competitively.” His solution was to introduce the No-Name private label brand in 1978. This way, Loblaw could provide reasonable quality products at reduced prices every day. This was very successful. Later Loblaw continued its private brand (or “control label” products, as it calls them) with President’s Choice in 1984, and eight others later, including the Joe Fresh Style line of clothing in 2006, for a total of over 5,000 items (over 1,800 of which are No-Name products). Shoppers’ private brand is called Life Brand. Loblaw in-store pharmacies also dispense generic drugs. Currie also believed in the advantage of an online in-store computerized information system. The use of bar codes and scanners allowed efficient data gathering that was used to identify profitability of items. This allowed Loblaw to control costs back up its supply chain. Throughout the years, Loblaw has grown immensely through buying smaller regional chains and opening new stores. The owners (the Weston family) believe in investing any free cash in the business. Loblaw uses multi-format stores in different markets. It now owns close to 500 franchises and approximately 1,050 grocery stores under several different banners, including large superstores such as The Real Canadian Superstore in the West and Ontario, Dominion in Newfoundland and Labrador, and Atlantic Superstore; medium-size food-focused stores (called Market stores) such as Loblaw’s and Zehrs (mainly in Ontario), and Provigo (in Quebec); discount food stores such as Extra Foods (in the West), No Frills (franchised), and Maxi and Maxi & Co in Quebec; wholesale stores such as Real Canadian Wholesale Club, Cash & Carry, Fortinos (in Ontario), Presto; and ethnic (Chinese) chain T&T Supermarkets. Shoppers Drug Mart’s more than 1,400 stores are franchised (pharmacist-owned). The different store banners sell basically the same products, with over 25 percent being Loblaw’s private brands. However, the general merchandise is sold only through large superstores. Until recently, pricing was not coordinated across different banners and regions. Relations with unions are fairly good. Loblaw has obtained wage cuts from its employees several times. Loblaw’s supply and distribution network is fairly efficient. It has 27 distribution centres throughout Canada, and has the largest fleet of trucks in the country. Administrative activities are now centralized in a huge office in Brampton, Ontario. Loblaw uses the enterprise resources planning software ERP/SAP to manage the company’s order management, inventory management, order tracking, forecasting, purchasing, pricing management, financials, master data management, and human resources. Control label products are continuously being expanded, with the objective that they constitute 30 percent of sales. Joe Fresh is now sold online and internationally. Other Loblaw digital initiatives include Click & Collect (online grocery ordering and pick up at a store), and Shoppers’ BeautyBoutique.ca ecommerce site. Loblaw has expanded its Click & Collect offering to more than 700 locations and added additional grocery pickup sites in the Toronto area through several of its Shoppers Drug Mart stores and GO Transit locations. Loblaw’s online marketplace launched in 2019. The goal is not only to boost the variety of items available through its brand, but also to provide opportunities to thirdparty vendors competing with Amazon for a share of the Canadian market. Since then, with the expansion of the brand’s existing PC Express platform, customers are able to order their groceries online for in-store pickup or home delivery. Questions 1. What competitive priority does Loblaw emphasize? 2. Describe and evaluate Loblaw’s operations strategy. Use the strategic decision categories. Niloo/Shutterstock Page 60 Mini-Case Why Productivity Matters It is sometimes easy to overlook the importance of productivity. National figures are often reported in the media. They may seem to be ho-hum; there’s nothing glamorous about them to get our attention. But make no mistake: They are key economic indicators—barometers, if you will, that affect everybody. How? High productivity and high standard of living go hand-in-hand. If a country becomes more service-based, as Canada has become, and if some (but not all) high-productivity manufacturing jobs are replaced by lower-productivity service jobs, that makes it more difficult to support a high standard of living. Productivity gains can offset inflationary pressures related to wage increases. Productivity increases result in lower costs per unit. Those savings not only generate higher profits, they also help pay for wage increases. Productivity levels are also important for industries and companies. For companies, a higher productivity relative to their competitors gives them a competitive advantage in the marketplace. With higher productivity, they can afford to undercut competitors’ prices to gain market share or charge the same prices but realize greater profits! For an industry, higher relative productivity means it is less likely to be supplanted by foreign industry. Questions 1. Why is high productivity important for a nation? 2. Why do you suppose that service jobs have lower productivity than manufacturing jobs? 3. How can a company gain a competitive advantage by having higher productivity than its competitors have? CHAPTER 3 Demand Forecasting Page 61 Markus Schmal/Shutterstock LEARNING OBJECTIVES After completing this chapter, you should be able to: LO1 LO2 LO3 Introduce forecasting, identify uses of demand forecasts, distinguish between forecasting time frames, describe common features of forecasts, list the elements of a good forecast and steps of the forecasting process, and contrast different forecasting approaches. Describe at least three judgmental forecasting methods. Describe the components of a time series model, explain averaging LO4 techniques, and solve typical problems. Describe trend forecasting and solve typical problems. LO5 LO6 LO7 LO8 LO9 Describe seasonality forecasting and solve typical problems using both the centred moving average and annual average methods. Describe associative models (regression) and solve typical problems. Describe three measures of forecast accuracy and two ways of controlling forecasts, and solve typical problems. Identify the major factors to consider when choosing a forecasting technique. Describe the importance of forecasting in supply chains. Every year, Bombardier Business Aircraft (BBA) produces a 10-year rolling demand forecast for its business jets. Factors such as world GDP growth, stock market returns, positive interest rate spread, and oil prices are all closely monitored inputs to the forecasting process. The worldwide business jet market is partitioned into major regions, including North America, Latin America, Europe, Middle East, Africa, Commonwealth of Independent States, Greater China, South Asia, and Asia Pacific. In each region, previous sales history and predicted economic growth are used to forecast fleet growth. For example, North America is expected to have an annual economic growth rate of 2.2 percent and a fleet growth rate of 2 percent. In 2015, the North American fleet stood at 10,355 units; it is forecasted to grow to 12,895 units in 2025, assuming a compounded annual growth of 2 percent. BBA then estimates total aircraft retirements over the same 10-year duration, and adds this number to obtain the number of deliveries in 10 years. For example, BBA expects 1,390 retirements in the next 10 years, resulting in 12, 895– 10, 355 + 1, 390 = 3, 930 deliveries. 3.1 Introduction Page 62 LO1 Introduce forecasting, identify uses of demand forecasts, distinguish between forecasting time frames, describe common features of forecasts, list the elements of a good forecast and steps of the forecasting process, and contrast different forecasting approaches. Forecasts are basic inputs for many kinds of decisions in organizations. One of the most important applications of forecasting in operations management is demand forecasting. It is important for all managers to be able to understand and use demand forecasts. Although product demand forecasts are typically developed by the sales/marketing function, the operations function (through production planning) will receive and use the demand forecasts. Also, the operations function develops demand/usage forecasts for supplies and spare parts. The importance of forecasting in matching supply and demand cannot be overstated. Having a forecast of demand is essential for determining how much capacity or supply will be needed to meet demand. For instance, operations needs to know what capacity will be needed to make staffing, equipment, and budget decisions; purchasing needs information for ordering from suppliers; and supply chain partners need to make their plans accordingly. Planning is an integral part of an operations manager’s job. If uncertainties cloud the planning process, operations managers will find it difficult to plan effectively. Demand forecasts help operations managers by reducing some of the uncertainty, thereby enabling them to develop more accurate plans. A deman d forecast is the estimate of expected demand for a specified period of time in the future. People make and use demand forecasts in their everyday life. They might say, for example, “How much food and drink will I need?” when visiting a grocery store, or “How much cash or gas will I need?” when visiting a bank or gas station. To make these forecasts, they take into account two kinds of information: current factors or conditions, and past experience in a similar situation. Sometimes they will rely more on one than the other, depending on which approach seems more relevant at the time. Demand forecasting for business purposes involves similar approaches. Businesses make plans for future operations based on anticipated future demand. Anticipated demand is derived from two possible sources: actual customer orders and forecasts. For businesses where customer orders make up most or all of anticipated demand, planning is straightforward, and little or no forecasting is needed. However, for many businesses, most or all of anticipated demand is derived from forecasts, and more formal methods are used to make demand forecasts and to assess forecast accuracy. Demand forecasting basically involves modelling the past pattern of demand for an item and projecting it into the future while taking new developments into account. There are three types of uses for demand forecasts in operations: (1) to help managers design the system (long-term plans), (2) to help them plan the medium-term use of the system, and (3) to schedule the short-term use of the system. Designing the system involves long-term plans about which goods and services to offer; which capacities, facilities, and equipment to have; where to locate; and so on. Planning the medium-term use of the system involves tasks such as planning overall inventory and workforce levels, and planning production at the aggregate product family level. Scheduling the shortterm use of the system involves scheduling of production, purchasing of parts and raw materials, and staff scheduling. Demand forecasting jobs are in high demand. Business forecasting pertains to more than predicting demand. Financial and economic forecasts are used to predict variables such as profits, revenues, costs, stock prices, and GDP. This chapter will focus on the forecasting of demand (sales of goods/services or usage of spare parts/supplies). Keep in mind, however, that the concepts and techniques presented in this chapter apply equally well to the other types of business forecasting. In spite of its use of computers and sophisticated mathematical models, forecasting is not an exact science. Instead, successful forecasting often requires a skillful blending of art and science. Experience, judgment, technical expertise, information, and communication all play a role in developing useful forecasts. Along with these, a certain amount of luck and a dash of humility can be helpful, because the worst forecasters occasionally produce a very good forecast, and even the best forecasters sometimes miss completely. Two aspects of demand forecasts are important: (1) the expected level of demand (forecast), and (2) the degree of accuracy that can be assigned to a forecast (i.e., the potential size of forecast error). The expected level of demand can be a function of some structural variation, such as a trend or seasonal variation. Forecast accuracy is a function of the ability of forecasters to correctly model demand, random variation, and sometimes unforeseen events. Generally speaking, the responsibility for preparing demand forecasts for finished goods or Page 63 services lies with the marketing or sales departments rather than operations. Nonetheless, because demand forecasts are major inputs for many operations decisions, operations managers must be knowledgeable about the kinds of forecasting techniques available, the assumptions that underlie their use, and their limitations. Also the operations function provides feedback about the feasibility of producing the demand forecasts. In addition, inventory managers (see usage of supplies and spare parts. See the “ application. OM in ACTION Chapter 11) make forecasts of Forecasting in Ocean Spray” OM in Action for an Forecasting in Ocean Spray Pat Lauzon/Shutterstock Ocean Spray is an agricultural cooperative owned by approximately 800 cranberry growers and 100 grapefruit growers in the United States and Canada (British Columbia and Quebec). It produces juices in bottles and cans in different flavour mixes and container sizes. When all of the combinations of products, sizes, and types of containers are taken into account, the number of different products ranges in the hundreds. For example, a case of eight 1.89 litre Cran-Apple juice drink bottles is a product. The company also keeps track of groups of similar products, called categories, and groups of same-size products (e.g., a group of all 1.89 litre cranberry drink bottles). Also, the products and groups in each of the company’s four North American manufacturing plants and for the major customers, the retail chains, are tracked separately. Forecasting is performed by the demand planning group, which is located in the logistics and planning department. It consists of a manager and five demand planners, who are each responsible for a combination of approximately 300 different products and category/size/manufacturing plant/major customer groupings. Forecasts are primarily used for production planning, purchasing, and shipment of the products. The planning process is called sales and operations planning, and is discussed in more detail later, in Chapter 12. During the first week of every month, the demand planners run software by Manugistics (now part of JDA Software) that uses the past three years’ history of shipments and time series models to forecast shipments for the next six months. These forecasts are shared with local sales managers to check and adjust based on local knowledge of customer intentions, inventory, and promotions. During the second week, the adjusted forecasts are further examined and adjusted by regional and divisional marketing managers in a group meeting called the forecast alignment meeting. During the third week, the aligned forecasts are passed to the production/supply planning team for review in the supply alignment meeting. Finally, during the last week of the month, upper managers from sales, marketing, operations, and finance meet with demand planners (in a sales and operations planning meeting) to review and implement the results of the alignment meetings. Before setting up the above formal process and using Manugistics in 1998, Ocean Spray did not have one unique forecast for each product and grouping. The accuracy of forecasts was low—the mean absolute percentage error (MAPE) was approximately 45 percent at the product level. Now, MAPE is approximately 25 percent. A challenge for the demand planners is the seasonality of sales of cranberries. Approximately 90 percent of sales occur during the fall, primarily before Thanksgiving and Christmas. Ocean Spray constantly introduces new products, such as a new mix of another fruit with cranberry. If a similar product has been introduced before, this product’s sales history will be used as a guide for the new product’s demand. Otherwise, the services of the consumer research department will be needed. Supply chain partners regularly collaborate on their forecasting processes. The customer company makes the forecast in consultation with the supplier, allowing for both sides to provide inputs such as the expectation of customers for increased quantities during a promotion, the capacity limitations of the supplier, and so on. This is called collaborative planning, forecasting, and replenishment (CPFR) (more on this in Chapter 15 on supply chain management). For an example of the consequences of not collaborating in forecasting in a supply chain, see the “ Barilla SpA” OM in Action. Page 64 OM in ACTION Barilla SpAA Barilla SpA, a pasta manufacturer, was founded in 1875 when Pietro Barilla opened a small shop in Parma, Italy. Competing in an oversaturated field of over 2,000 pasta manufacturers, Barilla was able to differentiate its products and grow the company using highly innovative marketing programs. Within 100 years, the company had become the largest pasta manufacturer in the world. In the past, Barilla had experienced problems with large amounts of variability in demand, resulting in significant operational inefficiencies and increased manufacturing costs. Management wondered how there could be large fluctuations in demand for a staple food product—as per capita consumption of pasta does not tend to fluctuate much from month to month. The reasons for the demand fluctuations are varied, but a significant portion of those fluctuations can be traced to the use of sales promotions and lack of collaborative forecasting. Barilla’s sales strategy relied heavily on the use of promotions ranging from 1.4 percent all the way up to 10 percent. This would cause a hockey stick effect with low demand at the beginning of each month and high demand at the end of each month as sales representatives pushed harder to clear out inventory. Downstream retailers and distributors were also reluctant to provide proprietary sales data that Barilla needed. With collaborative forecasting, Barilla and its distributors and retailers would work together to forecast demand, which would increase fill rates while reducing inventories. Forecasts affect decisions and activities throughout an organization, in accounting, finance, human resources, marketing, and management information systems (MIS), as well as in operations and other areas. Here are some examples of uses of forecasts in business organizations: Accounting. New product/process cost estimates, profit projections, cash management. Finance. Equipment/equipment replacement needs, timing and amount of funding/borrowing needs. Human resources. Hiring activities, including recruiting, interviewing, and training; layoff planning, including outplacement counselling. Marketing. Pricing and promotion, ebusiness strategies, global competition strategies. MIS. New/revised information systems, Internet services. Operations. Schedules, capacity planning, work assignments and workloads, inventory planning, makeor-buy decisions, outsourcing, project management. Product/service design. Revision of current features, design of new products or services. Features Common to All Forecasts A wide variety of forecasting techniques are in use. In many respects, they are quite different from one another, as you shall soon discover. Nonetheless, certain features are common to all techniques and forecasts, and it is important to recognize them. 1. Forecasting techniques generally assume that the same underlying causal system that existed Page 65 in the past will continue to exist in the future. For instance, if we have some evidence that average temperature has had an impact on the demand for winter jackets in the past, we can assume that such a relationship will continue to exist in the future. 2. Forecasts are rarely perfect; actual results usually differ from predicted values. No one can predict precisely how related factors will impinge upon the variable in question; this, and the presence of randomness, precludes a perfect forecast. Allowances should be made for inaccuracies. 3. Forecasts for groups of items tend to be more accurate than forecasts for individual items, because forecasting errors among items in a group usually have a cancelling effect. For example, the forecast for total sales of a new T-shirt will be more accurate than the forecast for each size and colour. 4. Forecast accuracy decreases the farther the forecasted time period is into the future. Generally speaking, short-term forecasts must contend with fewer uncertainties than longer-term forecasts, so the former tends to be more accurate. The forecasting horizon is the time period we are forecasting for. An important consequence of the last point is that flexible business organizations—those that can respond quickly to changes in demand—require a shorter forecasting horizon and, hence, benefit from more accurate short-term forecasts than competitors that are less flexible and must therefore use longer forecasting horizons. Flexibility can be achieved by shortening the lead time required to produce goods/services and to purchase raw materials/parts/supplies, and by using related approaches such as postponement (i.e., waiting until the customer order is received to add differentiating features to standard components or products). A manager cannot simply delegate forecasting to models or computers and then forget about it, because unplanned or special occurrences can wreak havoc with forecasts. For instance, weather-related events, sales promotions, and changes in features or prices of the company’s own and competing goods or services can have a major impact on demand. Consequently, a manager must be alert to such occurrences and be ready to override forecasts. The Disney Advanced Analytics team forecasts volume and revenue for the theme parks, water parks, and resort hotels, as well as merchandise, food, and beverage revenue by location to ensure services are not interrupted (see https://www.informs.org/Impact/O.R. -Analytics-Success-Stories/Industry-Profiles/Disney for more details). Atlantide Phototravel/Getty Images Elements of a Good Forecast A forecast should fulfill certain requirements: 1. The forecast should be timely. The forecasting horizon must cover the time necessary to Page 66 implement possible changes so that its results can be used. 2. The forecast should be accurate, and the degree of accuracy of the forecast should be stated. This will enable users to plan for possible errors and will provide a basis for comparing alternative forecasts. 3. The forecasting method/software chosen should be reliable; it should work consistently. 4. The forecast should be expressed in meaningful units. Financial planners need to know demand in dollars, whereas demand and production planners need to know demand in units. The choice of units depends on user needs. 5. The forecast should be in writing. Although this will not guarantee that all concerned are using the same information, it will at least increase the likelihood of it. In addition, a written forecast will permit an objective basis for evaluating the forecast once actual results are in. 6. The forecasting technique should be simple to understand and use. Users often lack confidence in forecasts based on sophisticated techniques; they do not understand either the circumstances in which the techniques are appropriate or the limitations of the techniques. Misuse of techniques is an obvious consequence. Not surprisingly, fairly simple forecasting techniques enjoy widespread popularity because users are more comfortable working with them. 7. The forecast should be cost-effective. The benefits should outweigh the costs. Steps in the Forecasting Process There are six basic steps in the forecasting process: 1. Determine the purpose of the forecast. Determine the level of detail required, the amount of resources (personnel, computer time, dollars) that can be justified, and the level of accuracy necessary. 2. Establish a forecasting horizon. The forecast must indicate a time interval, keeping in mind that accuracy decreases as the time horizon increases. 3. Gather and analyze relevant historical data. Ensure that the data is of past demand rather than sales or shipments, which will be different if there were stock-outs. Identify any assumptions that are made. 4. Select a forecasting technique. 5. Prepare the forecast. 6. Monitor the forecast. If it is not performing in a satisfactory manner, re-examine the parameters of the technique or use a different technique. Once the process has been set up, it may only be necessary to repeat steps 3 and 6 as new data become available. Approaches to Forecasting There are two general approaches to forecasting: judgmental (qualitative) and quantitative. Judgmental methods consist mainly of subjective inputs, which may defy precise numerical description (but may still depend on historical data). Quantitative methods involve either the use of a time series model to extend the historical pattern of data into the future, or the development of associative models that attempt to utilize causal (explanatory) variables to make a forecast. Mike Baldwin/Cornered/www.CartoonStock.com Judgmental techniques permit inclusion of soft information (e.g., human factors, personal opinions, hunches) in the forecasting process. Those factors are often omitted or downplayed when quantitative techniques are used because they are difficult to quantify. Quantitative techniques consist mainly of analyzing objective, or hard, data. They usually avoid personal biases that sometimes contaminate judgmental methods. In practice, either or both approaches might be used to develop a forecast. Judgmental methods rely on nonquantitative analysis of historical data and/or analysis of subjective inputs obtained from various sources, such as consumers (surveys), similar products (historical analogies), the sales staff, managers and executives, and panels of experts. Quite frequently, these sources provide insights that are not otherwise available (e.g., for new product development, promotions, etc.). Long-term forecasting typically uses judgmental methods because quantitative techniques may be inaccurate in this case. Page 67 Some forecasting techniques simply attempt to project past data into the future. These techniques use historical, or time series, data with the assumption that the future will be like the past. Time series models identify specific patterns in the data and project or extrapolate those patterns into the future, without trying to identify causes of the patterns. Associative models use equations that consist of one or more explanatory variables that can be used to predict future demand for the variable of interest. For example, demand for a particular paint might be explained by variables such as the price, the amount spent on advertising it, and the season, as well as specific characteristics of the paint (e.g., quality). Overview of Demand Forecasting by Forecasting Horizon Forecasting long-term demand typically involves annual data (for, say, the next five years). It requires knowledge of the specific market and judgment of experts/managers. For new products, either consumer surveys and test markets are undertaken, or demand for an analogous product is used. A common approach is to forecast the demand for the whole market, estimate the market share for the new product, and multiply the two to get the demand forecast. If historical data are available, the trend is estimated and projected into the future (using regression, for example). Forecasting medium-term demand typically involves monthly demand (for, say, the next 12 months). A mix of judgmental and quantitative methods is used. Seasonal effects are taken into account. Forecasting short-term demand typically involves daily or weekly demand (for, say, the next 12 weeks). Usually there are thousands of products/parts to forecast. Therefore, a simple quantitative method (e.g., an averaging technique) is used. Sales promotions are forecasted separately. 3.2 Judgmental Methods LO2 Describe at least three judgmental forecasting methods. In some situations, forecasters may rely solely on judgment and opinion to make forecasts. When introducing new products, redesigning existing products, and using sales promotions, judgmental forecasting is needed, as well as when analyzing future actions of customers and competitors. In such instances, forecasts may be based on collective executive opinions, opinions of the sales staff, consumer surveys, historical analogies, or opinions of experts. Executive Opinions A small group of upper-level managers (e.g., VPs of marketing, operations, and finance) may meet and collectively develop a forecast. This approach is often used as part of long-term strategic planning and new product development. It has the advantage of bringing together the considerable knowledge and talents of various managers. However, there is the risk that the view of one person will prevail, and the possibility that diffusing responsibility for the forecast over the entire group may result in less pressure to produce a good forecast. Sales Force Opinions The sales staff or the customer service staff is often a good source of information because of their direct contact with customers. They are often aware of any plans that the customers may be considering for the future, including the current level of customer inventory. There are, however, several risks to using sales force opinions. One is that these people are sometimes overly influenced by recent experiences. Thus, after several periods of low sales, their estimates may tend to become pessimistic; after several periods of good sales, they may tend to be too optimistic. In addition, if forecasts are used to establish sales quotas, there will be a conflict of interest because it is to the salesperson’s advantage to provide low sales estimates. Consumer Surveys Because it is the potential consumers who ultimately determine sales, it seems natural to solicit Page 68 input from them. In some instances, every customer or potential customer can be contacted. However, usually there are too many customers or there is no way to identify all potential customers. Therefore, organizations seeking consumer input usually resort to consumer surveys, which enable them to sample consumer opinions. This could be in the form of questionnaires conducted by mail or phone to a large sample of potential consumers. It also could be through group meetings with a small number of potential consumers (focus groups). Consumer surveys can be very useful in forecasting demand since they tap into information that is hardly available elsewhere. However, it is important to note that acquiring reliable information through surveys could be costly. Surveys could be expensive and time consuming. Conducting surveys, administering them, and correctly interpreting results for valid insight often require a considerable amount of knowledge and skill. Historical Analogies Sometimes the demand for a similar product in the past, after some adjustment, can be used to forecast a new product’s demand. For example, the demand for cranberry–apple drink can be used to forecast the demand for cranberry–grape drink. Expert Opinions The forecaster may solicit opinions from a number of experts. One way of doing this, the Delphi meth od, involves circulating a series of questionnaires among experts. Responses are kept anonymous, which tends to encourage honest responses and reduces the risk that one person’s opinion will prevail. Each new questionnaire is developed using the information extracted from the previous one, thus enlarging the scope of information on which participants can base their judgments. The goal is to achieve a consensus forecast. One application of the Delphi method is for technological forecasting—assessing changes in technology and their impact on an organization. Often the goal is to predict when a certain event will occur. For instance, the goal of a Delphi forecast might be to predict when a vaccine for a disease might be developed and ready for mass distribution. For the most part, these are long-term, single-time forecasts that usually have very little hard information to go by, or data are costly to obtain, so the problem does not lend itself to analytical techniques. 3.3 Time Series Models: Introduction and Averaging LO3 Describe the components of a time series model, explain averaging techniques, and solve typical problems. A time series is a time-ordered sequence of observations taken at regular intervals over a period of time (e.g., hourly, daily, weekly, monthly, quarterly, annually). Forecasting techniques based on time series data are made on the assumption that future values of the series can be estimated from their own past values. Although no attempt is made to identify variables that influence the series, these methods are widely used, often with quite satisfactory results. Analysis of time series data requires the analyst to identify the underlying behaviour (patterns) of the series (time series decomposition). This can often be accomplished by merely plotting the data and visually examining the plot. One or more patterns might appear: level (i.e., average), trend, seasonal variation, and cycle. In addition, there can be random and irregular variations. These behaviours (patterns) can be described as follows: 1. Level (average), or constant, refers to a horizontal (flat) pattern of time series. In this setting, the data do not show any particular pattern over time and are, generally, constant. 2. Trend refers to a persistent upward or downward movement in the data. Population growth, increasing incomes, and cultural changes often account for such movements. 3. Seasonality refers to regular repeating wavelike variations generally related to factors such as the calendar, weather, or recurring events. For example, sales of ice cream are higher in the summer. Restaurants, supermarkets, and theatres experience weekly and even daily “seasonal” variations. 4. Cycles are wavelike variations lasting more than one year. These are often related to a variety of economic, political, and even agricultural conditions, such as supply of cattle. 5. Irregular variations are due to unusual circumstances not reflective of typical behaviour, such as severe weather conditions, strikes, or sales promotions. They do not reflect typical behaviour, and whenever possible should be identified and removed from the data. 6. Random variations are residual variations that remain after all other behaviours have been accounted for (also called noise). This randomness arises from the combined influence of many— perhaps a great many—relatively unimportant factors, and it cannot be reliably predicted. Time series techniques smooth random variations in the data. Random variations are usually present alongside other forms of behaviour described above. Some of these behaviours are illustrated in Figure 3-1. The small “bumps” in the plots represent random variations. The following sections have descriptions of the various approaches to the analysis of time series data. FIGURE 3-1 Some behaviours of time series are observed in these time series. Source: Statistics Canada. Table 32-10-0053-01, Supply and disposition of food in Canada (x 1,000). Data is from 1990 to 2021. Source: Statistics Canada. Table 32-10-0053-01, Supply and disposition of food in Canada (x 1,000). Data is from 1990 to 2021. Page 69 Source: Statistics Canada. Table 32-10-0112-01, Production of selected dairy products. In this chapter, we will review some methods that are used to identify and analyze different components in time series to identify patterns and behaviours and use them for forecasting. Naïve Methods A simple but widely used approach to forecasting is the naïve method. The naïve method can be Page 70 used with a stable series (level with random variations), with seasonal variations, or with trend. With a stable series, the last data point becomes the naïve forecast for the next period. Thus, if the demand for a product last week was 20 cases, the forecast for this week is 20 cases. With seasonal variations, the naïve forecast for this “season” is equal to the value of the series last “season.” For example, the forecast for demand for turkeys this Christmas is equal to demand for turkeys last Christmas. For data with trend, the naïve forecast is equal to the last value of the series plus or minus the difference between the last two values of the series. For example, supposing the last two values in the series were 50 and 53, the forecast for the third period will be equal to 56: Period Actual 1 50 Change From Previous Value Naïve Forecast Period Actual Change From Previous Value 2 53 +3 3 Naïve Forecast 53 + 3 = 56 Although at first glance the naïve method may appear too simplistic, it is nonetheless a legitimate forecasting tool used by some businesses such as restaurants and retail stores. Consider the advantages: it has virtually no cost, it is quick and easy to prepare, and it is easily understandable. The main objection to this method is its inability to provide highly accurate forecasts. However, if resulting accuracy is acceptable, this approach deserves serious consideration. Moreover, even if other forecasting techniques offer better accuracy, they will almost always involve a greater cost. The naïve forecast can serve as a standard of comparison against which to judge the cost and accuracy of other techniques. Thus, managers must answer the question: Is the increased accuracy of another method worth the additional resources required to achieve that accuracy? One weakness of the naïve method is that the forecast just traces the actual data, with a lag of one period; it does not smooth out the random variations present in the data. Next, we will present other methods that aim to overcome this issue. Averaging Methods Historical data typically contain a certain amount of random variation that tends to obscure systematic movements in the data. This randomness arises from the combined influence of many—perhaps a great many—relatively unimportant factors, and it cannot be reliably predicted. Averaging techniques smooth variations in the data. Ideally, it would be desirable to completely remove any randomness from the data and leave only “real” variations, such as changes in the demand. As a practical matter, however, it is usually impossible to distinguish between these two kinds of variations, so the best one can hope for is that the small variations are random and the large variations are “real.” Averaging techniques smooth fluctuations in a time series because the individual highs and lows in the data offset each other when they are combined into an average. A forecast based on an average thus tends to exhibit less variability than the original data (see Figure 3-2). This can be advantageous because many of these movements reflect merely random variability rather than a true (or “real”) change in the series. Moreover, because responding to changes in expected demand often entails considerable cost (e.g., changes in production rate, changes in the size of a workforce, inventory changes), it is desirable to avoid reacting to minor variations. Thus, minor variations are treated as random variations, whereas larger variations are viewed as more likely to reflect “real” changes, although these, too, are smoothed to a certain degree. FIGURE 3-2 Averaging applied to various patterns Page 71 Averaging techniques generate forecasts that reflect recent values of a time series (e.g., the average value over the last several periods). These techniques work best when a series tends to vary around an average, although they also can handle step changes or gradual changes in the level of the series. Three techniques for averaging are described in this section: 1. Moving average 2. Weighted moving average 3. Exponential smoothing Moving Average Remember, one weakness of the naïve method is that the forecast just traces the last actual data value and that it does not smooth the random variations in the data. The moving average technique tries to overcome this issue by expanding the amount of historical data the forecast is based on, and smoothing the random variation present in the data. This method uses a number of recent actual data values and uses the average of these values to develop the forecast. The moving average forecast is updated as a new value becomes available. Basically, the forecast is an average of most recent data values that moves (to include the new data point and discard the oldest one) as new data become available, hence the name moving average. The n-period moving average forecast for period t is the average of n most recent actual values. (3-1) t−1 ∑ Ft = MA n = Ai i=t−n n where i = The index for the period (i = t − 1 : last period; i = t − 2 : two periods back, …) n = Number of periods (data points) in the moving average Ai = Actual value in period i MAn = n period moving average Ft = Forecast for this period (i.e., period t) EXAMPLE 3-1 Calculate a three-period moving average forecast for the demand of a product, given its demand for the last five periods. SOLUTION 43 + 40 + 41 F6 = = 41.33 3 The forecast for period 6 using the moving average method is 41.33. Once the actual demand in period 6 is realized, it can be used to develop the forecast for period 7. For instance, if the actual demand in period 6 turns out to be 39, the moving average forecast for period 7 would be 40 + 41 + 39 F7 = = 40.00 3 Note that in the moving average method, as each new actual value becomes available, the forecast is updated by adding the newest value and dropping the oldest and then calculating the average. Figure 3-3 illustrates a three-period moving average forecast plotted against the actual demand during 31 periods. Note how the moving average forecast lags behind the actual values and how smooth the forecasted values are compared with the actual values. Page 72 FIGURE 3-3 A moving average forecast tends to smooth the data but lags behind the data. The moving average forecast can incorporate as many data points as desired. In selecting the number of periods to include, the decision maker must take into account that the number of data points in the moving average determines its sensitivity to each new data point: the fewer the data points in a moving average, the more sensitive (responsive) to most recent data the moving average forecast tends to be. (See Figure 3-4.) If responsiveness is important, a moving average with relatively few data points should be used. This will permit quick adjustment to a change in the data, but it will also cause the forecast to be somewhat responsive even to random variations. Conversely, moving averages based on more data points will be smoother but less responsive to “real” changes. Hence, the decision maker must weigh the cost of responding more slowly to changes in the data against the cost of responding to what might simply be random variations. A review of forecast errors (later in the chapter) can help in this decision. FIGURE 3-4 The fewer the time periods in a moving average, the greater the responsiveness of the forecast to the most recent data. The advantages of a moving average forecast are that it is easy to calculate and easy to understand. A possible disadvantage is that all values in the moving average forecast are weighted equally. For instance, in a five-period moving average forecast, each value has a weight of 1/5. Hence, the oldest value has the same weight as the most recent value. If a “real” change occurs in the series (as opposed to random variations), a moving average forecast may be slow to react, especially if there are a large number of values in the average. Decreasing the number of values in the average increases the weight of more recent values, but it does so at the expense of losing potential information from less recent values. The next method discussed here aims to overcome that difficulty to some extent. Weighted Moving Average A weighted moving average is similar to a moving average, except that it allows for the assignment of different weights for different periods included in the forecasting analysis. This results in different periods having different weights in the calculation of the moving average forecast. Typically, larger weights are assigned to the most recent values in a time series in calculating a forecast. For instance, the most recent value might be assigned a weight of 0.40, the next most recent value a weight of 0.30, the next after that a weight of 0.20, and the next after that a weight of 0.10. Note that the weights sum to 1.00, and that the heaviest weights are assigned to the most recent values. Page 73 F t = w t−n (A t−n ) + ... + w t−2 (A t−2 ) + w t−1 (A t−1 ) where i = The index f or the period (i = t − 1 : last period, i = t − 2 : two periods back, ...) n = Number of periods (data points) in the weighted moving average Ai = Actual demand in period i wi = Weight assigned to period i Ft = Forecast f or this period (i.e., period t) EXAMPLE 3-2 Given the following demand data, a. Calculate a weighted moving average forecast for period 6 using a weight of 0.40 for the most recent period, 0.30 for the next most recent, 0.20 for the next, and 0.10 for the next. b. If the actual demand for period 6 is 39, forecast the demand for period 7 using a weighted moving average with the same weights as in part a. Period Demand 1 42 2 40 3 43 4 40 5 41 SOLUTION a. F 6 = 0.40 (41) + 0.30 (40) + 0.20 (43) + 0.10 (40) = 41.0 b. F 7 = 0.40 (39) + 0.30 (41) + 0.20 (40) + 0.10 (43) = 40.2 Note that if four weights are used, only the four most recent demand values should be used to prepare the forecast. The advantage of a weighted moving average over a simple moving average is that the weighted moving average is more reflective of the most recent observations. However, the choice of weights is somewhat arbitrary and generally involves the use of trial and error to find a suitable weighting scheme. Exponential Smoothing Exponential smoothing is a sophisticated weighted averaging method, where the forecast for each period is based on the forecast for the previous period plus a percentage of the forecast error. The forecast error is the difference between the previous period’s actual value and its forecast. That is: Forecast = Previous f orecast + α(Previous actual − Previous f orecast) where (Previous actual − Previous forecast) represents the forecast error and α is a percentage of the error, where 0 <α< 1. The α is commonly referred to as the smoothing constant. More concisely, F t = F t−1 + α(A (3-2a) t−1 − F t−1 ) where Ft = Forecast for period t Ft−1 = Forecast for period t − 1 α = Smoothing constant, 0 < α < 1 At−1 = Actual demand in period t − 1 For example, suppose that the previous forecast was 42 units, previous actual demand was 40 units, and α = 0.10. The new forecast would be computed as follows: Page 74 F t = 42 + 0.10(40 − 42) = 41.8 Then, if the actual demand turns out to be 43, the next forecast would be: F t = 41.8 + 0.10(43 − 41.8) = 41.92 An alternative form of actual demand: Formula 3-2a reveals the weighting of the previous forecast and the previous F t = (1 − α)F t−1 + αA (3-2b) t−1 For example, if α = 0.10, this would be F t = 0.90F t−1 + 0.10A t−1 The quickness of adjustment by forecast error is determined by the smoothing constant, α. The closer its value is to zero, the slower the forecast will be to adjust to forecast errors (i.e., the greater the smoothing). Conversely, the closer the value of α is to 1.0, the greater the responsiveness and the less the smoothing. This is illustrated in Example 3-3. EXAMPLE 3-3 The following table illustrates two series of exponential smoothing forecasts for a data set, and the resulting (Actual − Forecast) = Error, for each period. One forecast uses α = 0.10 and the other uses α = 0.40. The following figure plots the actual data and both sets of forecasts. It can be observed that the 0.10 forecast plot is smoother and less responsive than the 0.40 forecast plot. α = 0.10 α = 0.40 Period (t) Actual Demand 1 42 2 40 42 −2 42 −2 3 43 41.8 1.2 41.2 1.8 4 40 41.92 −1.92 41.92 −1.92 5 41 41.73 −0.73 41.15 −0.15 6 39 41.66 −2.66 41.09 −2.09 7 46 41.39 4.61 40.25 5.75 8 44 41.85 2.15 42.55 1.45 9 45 42.07 2.93 43.13 1.87 10 38 42.36 −4.36 43.88 −5.88 11 40 41.92 −1.92 41.53 −1.53 12 Forecast Error Forecast Error — — — — 41.73 40.92 Selecting a smoothing constant is basically a matter of judgment or trial and error (or one can Page 75 use the forecast errors to guide the decision). The goal is to select a smoothing constant that balances the benefits of smoothing random variations with the benefits of responding to real changes if and when they occur. Commonly used values of α range from 0.05 to 0.50. Low values of α are used when the underlying average tends to be stable; higher values are used when the underlying average is susceptible to change. Some computer packages include a feature that permits automatic modification of the smoothing constant so that the forecast errors do not become unacceptably large. This method is called adaptive (or variable response) exponential smoothing. Exponential smoothing is one of the most widely used techniques in forecasting, partly because of its ease of computation and partly because of the ease with which the weighting scheme can be altered— simply by changing the value of α. Note: A number of different approaches can be used to obtain a starting forecast, such as the average of the first several periods, a subjective estimate, or the first actual value as the forecast for period 2 (i.e., the naïve approach as seen in Example 3-3). For simplicity, the naïve approach is used in this book. In practice, using an average of, say, the first three values as a forecast for period 4 would provide a better starting forecast because it would be more stable. 3.4 Techniques for Trend LO4 Describe trend forecasting and solve typical problems. Analysis of trend involves developing an equation that will suitably describe the trend (assuming that trend is present in the data). The trend component may be linear or it may be nonlinear. Some commonly encountered nonlinear trend types are illustrated in Figure 3-5. A simple plot of the data can often reveal the existence and nature of a trend. We will first focus on linear trends because they are fairly common. Linear trends are usually developed using a trend equation (i.e., a regression equation). FIGURE 3-5 Examples of nonlinear trends Linear Trend Equation A simple regression model is commonly presented in the format ŷ = a + bx. Similarly, the linear tren d equation has the form (3-3) F t = a + bt where t = Index for time periods, starting from t = 0 Ft = Value of trend line at period t a = Value of trend line at t = 0 (intercept) b = Slope of the trend line For example, consider the trend equation F = 45 + 5t. The intercept (i.e., value of Ft when t = 0) is 45, and the slope is 5, which means that, on the average, the value of the forecast will increase by five units for each time period. If t = 10, the forecast, Ft, is 45 + 5 (10) = 95 units. The equation can be plotted by finding two points on the line. One can be found by substituting some value of t into the equation (e.g., t = 10). The other point is (0, a) (i.e., Ft at t = 0). Plotting those two points and drawing a straight line through them yields the graph of the linear trend line. t The coefficients of the line, a and b, can be computed from data using these two equations: (3-4) n ∑ ty − ∑ t ∑ y b = n∑t 2 − (∑ t) 2 (3-5) ∑y − b∑t ¯ a = ory − bt̄ n where n = Total number of periods y = Value of the demand time series Page 76 Note that these equations are identical to those used for computing a linear regression line, except that t replaces x in the equations. Values for the trend equation can be obtained easily by using the Excel template for linear trend. EXAMPLE 3-4 Cellphone sales of a company over the last 10 weeks are shown below. The data appear to have a linear trend. Determine the equation of the linear trend and predict the sales of cellphones for weeks 11 and 12. Plot the data and trend line. Week Unit Sales 1 700 2 724 3 720 4 728 5 740 6 742 7 758 8 750 9 770 10 775 SOLUTION Week (t) y ty t2 1 700 700 1 2 724 1,448 4 3 720 2,160 9 4 728 2,912 16 5 740 3,700 25 6 742 4,452 36 Using Week (t) y ty t2 7 758 5,306 49 8 750 6,000 64 9 770 6,930 81 10 775 7,750 100 55 7,407 41,358 385 Formulas 3-4 and 3-5, we can calculate the coefficients of the trend line: 10(41,358) − 55(7,407) b = 6,195 = 10(385) − 55(55) = 7.51 825 7,407 − 7.51(55) a = = 699.40 10 Thus, the trend line is ŷ = 699.40 + 7.51t. t Substituting values of t into this equation, the forecasts for the next two weeks (i.e., t = 11 and t = 12 ) are: F 11 = 699.40 + 7.51(11) = 782.01F 12 = 699.40 + 7.51(12) = 789.52 The original data (in blue), the trend line (in red), and five projections (forecasts) are shown on the following graph. It is evident that the data exhibit a linear trend. Source: Microsoft Corporation We can use the Excel template from Connect to solve this problem. Alternatively, we can set up Page 77 our own Excel template. In fact, Excel has a feature that makes fitting a trend line very easy. In Excel, highlight the data for the actual values (already inserted in a column), click “Insert” on the command bar, and then click “Scatter with Straight Lines and Markers” from the Scatter Plot menu. Next, click on a white space on the chart (Option menu will appear on the right). Click on “+” and choose “Trendline.” Click on the trend line on the graph and right-click to “Format Trendline …,” and check the option “Display Equation on Chart.” This will show you the equation for the trend line. Nonlinear Trend Although a linear trend is appropriate for some series, it may be inadequate for others, where a linear equation may not be able to accurately capture the change among the data points. Examples may Example 3-5 include demand for products during early or final phases of the product life cycle. illustrates such a case, where the relationship between data points follows an exponential trend. EXAMPLE 3-5 PHH Fantus Corp. (now part of Deloitte) was involved in facility location and capacity planning consulting work.B One project involved a manufacturer of audio products with a production facility in the United Kingdom that needed more production capacity. From this plant, the company was supplying all of Europe. The question was where to locate a second plant and what capacity to build it for. The historical sales for all major European countries were available. From these, Fantus forecasted 1991–1995 sales. The largest sales market was in Germany, and it appeared to have an exponential trend (see the graph). We wish to determine the equation for this trend and extend it one year further. Year (x) Projected Sales in Germany (in million units) 1991 11.3 1992 13.4 1993 16.1 1994 19.2 1995 22.9 SOLUTION After entering the data in Excel and drawing the time series line plot using “Chart,” we use the “Trendline” function to fit the best exponential trend to the data. The equation will also be displayed if you select the “Display Equation on Chart” option. The exponential trend equation is approximately, ŷ = 9.4431e 0.1772x t , where e = 2.7182818. Note that this exponential trend assumes a constant percentage increase in sales from one year to the next. This constant growth rate can be determined as follows: take the coefficient of year index x from regression, raise e to the power of the coefficient, subtract 1, and multiply by 100. For this example, e 0.1772 = 1.194, so the constant percentage yearly increase in sales is 19.4 percent. This can be confirmed by subtracting any year’s sales from the following year’s sales and dividing by the same year’s sales. For example: (Forecast sales 1995 − Forecast sales 1994)/Forecast sales 1994 = (22.9 − 19.2)/19.2 = 0.193, or 19.3 percent (the difference to 19.4 percent is rounding error). The forecast for 1996 is F 96 = 9.4431e million units. 0.1772(6) = 27.3 Trend-Adjusted Exponential Smoothing A variation of simple exponential smoothing can be used when a time series exhibits a linear trend. It is called trend-adjusted exponential smoothing or double exponential smoothing. If a series exhibits trend, and exponential smoothing is used on it, the forecasts will all lag behind the trend: if the data are increasing, each forecast will be too low; if the data are decreasing, each forecast will be too high. The trend-adjusted forecast (TAF) for period t + 1 is composed of two forecasts: Page 78 (3-6) TAF t+1 = S t + T t where St = Smoothed series at the end of period t Tt = Smoothed trend at the end of period t which are in turn estimated by: S t = TAF t + T t = T t−1 + α(A − TAF ) t (3-7) t β(TAF − TAF t t−1 − T t−1 ) where α and β are smoothing constants, and At = Actual value in period t. In order to use this method, one must select values of α and β (usually through trial and error) and make an estimate of starting smoothed series and smoothed trend. We will use the first few data points to estimate the smoothed series and smoothed trend. EXAMPLE 3-6 Using the cellphone data from Example 3-4 (where it was concluded that the data exhibited a linear trend), use trend-adjusted exponential smoothing to prepare forecasts for periods 5 through 11, with α = 0.4 and β = 0.3. Use the first four weeks to estimate the initial smoothed trend and data from week 4 to estimate the initial smoothed series. SOLUTION The starting smoothed trend can be based on the net change of 728 − 700 = 28 for the three changes from week 1 to week 4, for an average of 28/3 = 9.33. This value is for the smoothed trend for periods 4 and 5, T 4 = T 5 = 9.33. The initial smoothed series for period 4 is assumed to be equal to the actual data of period 4, S 4 = A 4 = 728. The rest of the values for the forecast and the trend are calculated according to the equations in Formulas 3-6 and 3-7. Table 3-1 displays the data again in the Actual column. We will use the average of the first four weeks as the starting smoothed series. TABLE 3-1 Trend-adjusted exponential smoothing Period Actual S t−1 + T t−1 = T AF t T AF t + α(A t − T AF t ) = S t 5 740 728 + 9.33 = 737.33 737.33 + 0.4(740 – 737.33) = T t−1 + β(T AF t − T AF t−1 − 9.33 738.40 6 742 738.4 + 9.33 = 747.73 747.73 + 0.4(742 – 747.73) = 9.33 + 0.3(747.73 – 737.33 – 9 745.44 7 758 8 750 9 770 10 775 745.44 + 9.65 = 755.09 + 0.4(758 – 755.09) = 755.09 756.25 756.25 + 8.96 = 765.21 + 0.4(750 – 765.21) = 765.21 759.13 759.13 + 9.31 = 768.44 + 0.4(770 – 768.44) = 768.44 769.06 769.06 + 7.49 = 776.55 + 0.4(775 – 776.55) = 776.55 775.93 9.65 + 0.3(755.09 – 747.73 – 9 8.96 + 0.3(765.21 – 755.09 – 8 9.31 + 0.3(768.44 – 765.21 – 9 7.49 + 0.3(776.55 – 768.44 – 7 The trend-adjusted forecast for period 11 will be equal to T AF = S + T = 775. 93 + 7. 68 = 783. 61. The results are demonstrated on the Excel sheet as presented below. 11 10 10 Source: Microsoft Corporation Although calculations for trend-adjusted exponential smoothing are somewhat more involved than for a linear trend line, trend-adjusted exponential smoothing has the ability to adjust to Page 79 Figure 3-6 changes in trend. A manager must decide if this benefit justifies the extra calculations. shows the graph of the actual demand and the trend-adjusted exponential smoothing forecasts. FIGURE 3-6 Actual versus trend-adjusted exponential smoothing forecasts 3.5 Techniques for Seasonality LO5 Describe seasonality forecasting and solve typical problems using both the centred moving average and annual average methods. Seasonal variations in time series data or seasonality are regularly repeating wavelike movements in series values that can be tied to recurring events. Familiar examples of data with seasonality are retail trade, ice cream sales, and residential natural gas sales. Most seasonal variations repeat annually. However, the term seasonal variation is also applied to shorter lengths of repeating patterns (e.g., daily, weekly, monthly). For example, rush-hour traffic occurs twice a day—incoming in the morning and outgoing in the late afternoon. Theatres and restaurants often experience weekly repeating demand patterns, with higher demand on Fridays or weekends. Banks may experience daily repeating “seasonal” variations (heavier traffic during the noon hour and just before closing), weekly repeating variations (heavier toward the end of the week), and monthly repeating variations (heavier around the beginning of the month because of payroll cheques being cashed or deposited). Most products and services have seasonality. Rblfmr/Shutterstock Gabe Smith/Shutterstock Demand for lawn mowers and winter parkas is subject to seasonal fluctuation. This is reflected in the demand forecasting and capacity planning of retailers such as Canadian Tire Corp. and Canada Goose Holdings Inc. Seasonality in a time series is expressed in terms of the amount that actual values deviate from the average value of a series during the length of a repeating pattern (e.g., a year). If trend is present, seasonality is measured relative to the trend value. Page 80 There are two different models of seasonality: additive and multiplicative. In the additive model, seasonality is expressed as a quantity (e.g., 20 units), which is added to or subtracted from the series average (or trend), in order to incorporate seasonality. In the multiplicative model, seasonality is expressed as a proportion of the average (or trend) amount (e.g., 1.10), which is then multiplied by the average (or trend) of the series. Figure 3-7 illustrates the two models for a linear trend line. In practice, most organizations use the multiplicative model, so we shall focus exclusively on the multiplicative model. FIGURE 3-7 The additive and multiplicative models compared using a linear trend The seasonal proportions in the multiplicative model are referred to as seasonal relatives or seasonal indexes. Suppose that the seasonal relative for the quantity of toys sold in November at a store is 1.20. This indicates that toy sales for that month are 20 percent above the monthly average. A seasonal relative of 0.90 for July indicates that July sales are 90 percent of the monthly average. displays a variety of seasonal variations. Figure 3-8 Page 81 FIGURE 3-8 Examples of seasonal variation Source: Canadian Gas Association. Natural Gas Statistics - Natural Gas Sales - Canada. Source: Statistics Canada. Table 20-10-0001-01, New motor vehicle sales. Source: Statistics Canada. Table 20-10-0008-01, Retail trade sales by province and territory (x 1,000). Knowledge of seasonal variations is an important factor in retail planning and scheduling. Moreover, seasonality can be an important factor in capacity planning for systems that must be designed to handle peak loads (e.g., public transportation, electric power plants, highways, and bridges). Knowledge of the extent of seasonality in a time series can enable one to remove seasonality from the data (i.e., to seasonally adjust or deseasonalize the data) in order to discern other patterns. Thus, one frequently reads or hears about, for example, the “seasonally adjusted unemployment rate” or “seasonally adjusted personal income.” The next section briefly describes how seasonal relatives are used, and the following section describes how seasonal relatives are computed. Using Seasonal Relatives Seasonal relatives are used in two different ways in forecasting. One way is to deseasonalize data; the other way is to incorporate seasonality in a forecast (i.e., to reseasonalize the data). To deseasonalize the data is to remove the seasonal component from the data in order to get a clearer picture of the nonseasonal components (e.g., trend). Deseasonalizing a time series helps to find out about these components, which may otherwise by overshadowed by the seasonal component. Deseasonalizing data is accomplished by dividing each data point by its seasonal relative (e.g., divide November demand by the November relative, divide December demand by the December relative, and so on). Once the deseasonalized demand forecast is calculated, it needs to be reseasonalized to reflect the seasonal nature of demand as well. Reseasonalizing the forecasts of the deseasonalized demand is accomplished by multiplying each forecast by its seasonal relative. The complete steps of forecasting seasonal demand, called time series decomposition, are as follows: 1. Compute the seasonal relatives. 2. Deseasonalize the demand data. 3. Fit a model to the deseasonalized demand data (e.g., moving average or trend). 4. Forecast using this model (to obtain the deseasonalized forecasts). 5. Reseasonalize the deseasonalized forecasts. Example 3-7 illustrates Steps 3 and 5 of this approach. Page 82 EXAMPLE 3-7 A furniture manufacturer wants to predict quarterly demand for a certain love seat for quarters 15 and 16, which happen to be the second and third quarters of a particular year. The series has both trend and seasonality. Quarter relatives are Q 1 = 1.20, Q 2 = 1.10, Q 3 = 0.75, and Q 4 = 0.95. The trend portion of deseasonalized demand data is projected using the equation F t = 124 + 7. 5t, where t is the index of the quarter and Ft is the estimate of the trend component of demand in quarter t, using the linear trend method. Use this information to predict demand for quarters 15 and 16. SOLUTION The trend values at t = 15 and t = 16 are: F 15 = 124 + 7.5 (15) = 236.5 F 16 = 124 + 7.5 (16) = 244.0 Multiplying the trend value by the appropriate quarter relative yields a forecast that includes both trend and seasonality. Given that t = 15 is a second quarter and t = 16 is a third quarter, the forecasts are: Period15 : 236.5 (1.10) = 260.15 Period16 : 244.0 (0.75) = 183.00 Computing Seasonal Relatives A widely used method to compute seasonal relatives is the centred moving average (CMA). The computations are similar to those for a moving average forecast. However, the values are not projected as forecasts; instead, they are positioned in the middle of the set of periods used to compute the moving average. The implication is that the CMA is most representative of the middle point of the repeating period. For example, consider the following time series data where the length of a repeating pattern is three periods: Period Demand 1 40 2 46 Three-Period Centred Average 42.67 40 + 46 + 42 Average = = 42.67 3 3 42 The three-period average is 42.67. As a centred average, it is positioned at period 2; the average is most representative of the series at that point. The ratio of the actual demand at period 2 to this centred average at period 2 is an estimate of the seasonal relative at that point. Because the ratio is 46/42.67 = 1.08, the series is 8 percent above average at that point. However, to achieve a reliable estimate of seasonality (seasonal relative) for any season, it is necessary to compute seasonal ratios for a number of seasons and then average these ratios. For example, average the seasonal ratios calculated for two or three Fridays to derive the seasonal relative for Friday, average the seasonal ratios calculated for two or three Saturdays to derive the seasonal relative for Saturday, and so on. Example 3-8 illustrates this procedure in a situation where the length of the repeating pattern is one week (i.e., each day is considered a “season”). Notice how the seasonal relative each day is calculated by averaging a few seasonal ratios derived for that day. Page 83 EXAMPLE 3-8 The manager of a parking lot has calculated the daily relatives for the number of cars per day in the parking lot. The length of a repeating pattern is a week. The calculations are displayed below (about three weeks are shown for illustration). A seven-period centred moving average is used because there are seven days (seasons) per week. The estimated seasonal relative for Friday is (1.36 + 1.40 + 1.33)/3 = 1.36. Seasonal relatives for other days can be calculated in a similar manner. For example, since there are only two seasonal ratios available for Tuesday, the estimated seasonal relative for Tuesday is (0.84 + 0.89)/2 = 0.87. The sum of average seasonal ratios of the seven days of the week should be equal to seven (because an average day has a seasonal relative of one and there are seven average days in a week). If it is not, the average ratios should be adjusted by rescaling them. The number of periods needed in a centred moving average is equal to the number of “seasons” involved. For example, with quarterly data with seasonality, a four-period centred moving average is needed. When the number of periods (seasons) is odd, the centred moving average is assigned to one of the periods (like in Example 3-8). However, when the number of periods is even, one additional step is needed because the middle of an even set of periods falls between two middle periods. The additional step requires taking a centred two-period moving average of the initial even-numbered centred moving averages (which fall between periods). This results in averages that “line up” with data points and, hence, permits the determination of seasonal ratios. The following example illustrates this case, as well as the other steps of the time series decomposition. Page 84 Example 3-9 Below are quarterly data for the amount of yoghurt produced in Canada from quarter 1 of 2018 to quarter 4 of 2021.C a. Calculate the quarterly relatives using the centred moving average method. b. Deseasonalize the data, fit an appropriate model to the deseasonalized data, project it four quarters ahead, and reseasonalize data to obtain forecasts for yoghurt demand for Q1 to Q4 of 2022. SOLUTION a. The following table illustrates centred moving averages with four periods(CM A ) and those with two periods (CM A ). The CM A values are calculated to find centred moving averages that line up with each quarter. In the second table below, the seasonal ratios for each quarter are averaged to find the seasonal relative assignable 4 2 2 to each quarter. The averages are adjusted so that they add up to four (which is the number of periods here). Quarter 1 2 2018 2019 0.997 1.024 3 4 0.983 0.991 0.984 0.988 Total Quarter 1 2 3 4 2020 1.015 1.005 0.984 0.995 2021 1.016 1.005 Average 1.009 1.011 0.984 0.991 3.996 Adjusted 1. 009 (4/3.996) = 1. 010 1.011 (4/3.987) = 1.012 0.985 0.992 4.000 Quarter 2018 2019 2020 2021 Total Production (Thousand Tonnes) Seasonal Relatives Deseasonalized Production 1 98 1.010 98/1. 010 = 96. 989 2 100 1.012 100/1.012 = 98. 772 3 95 0.985 96.473 4 95 0.992 95.727 1 95 1.010 94.020 2 97 1.012 95.809 3 93 0.985 94.442 4 93 0.992 93.711 1 95 1.010 94.020 2 94 1.012 92.846 3 92 0.985 93.426 4 93 0.992 93.711 1 95 1.010 94.020 2 94 1.012 92.846 3 92 0.985 93.711 4 93 0.992 94.020 The deseasonalized data has a linear trend. Therefore, a linear trend is fitted to the deseasonalized data using regression, and its equation is displayed at the top of the chart above. Using the regression equation, the trend forecasts for periods 17 to 20 (Q1 to Q4 of 2022) are: Y 17 = −0. 2839 (17) + 97. 035 = 92. 209 Y 18 = −0. 2839 (18) + 97. 035 = 91. 925 Y 19 = −0. 2839 (19) + 97. 035 = 91. 641 Y 20 = −0. 2839 (20) + 97. 035 = 91. 357 The above numbers are not the forecast for the demand, as they lack the seasonality component (they are deseasonalized). To derive demand forecasts, they should be reseasonalized by multiplying them by the seasonal relatives. The reseasonalized forecasts for Q1 to Q4 of 2022 are: F 17 = 92. 209 (1. 010) = 93. 170 F 18 = 91. 925 (1.012) = 93. 067 F 19 = 91. 641 (0. 985) = 90. 242 F 20 = 91. 357 (0.992) = 90. 663 An alternative (and simpler) method for finding seasonal relatives is the annual average met hod. To find the seasonal relatives using this method, we follow the procedure below (assuming Page 85 each quarter is a season): Page 86 1. For each year, compute its total annual demand and average seasonal demand. 2. For each year, for each season, compute the ratio of the actual demand relative to average seasonal demand. 3. For each season, average the ratios across years to get seasonal relatives. 4. Fit a linear trend to the total annual demand series. 5. Extend the model into the future to get next year’s total annual demand. 6. Divide the forecast of next year’s total annual demand by 4 to get the forecast of next year’s average seasonal demand. 7. For each season, multiply the forecast of next year’s average seasonal demand by the season’s seasonal relative. EXAMPLE 3-10 Consider the same data as Example 3-9. a. Compute the seasonal relative for each quarter using the annual average method. b. Forecast the sales of yoghurt in each quarter of 2022. SOLUTION a. Quarter 2018 2019 2020 2021 1 98 95 95 95 2 100 97 94 94 3 95 93 92 92 4 95 93 93 93 Total 388 378 374 374 Average 97 94.5 93.5 93.5 Quarter 2018 Ratio 2019 Ratio 1 98/97 = 1. 01 1.005 2020 Ratio 2021 Ratio 1.016 1.016 Average Ratio (1. 010 + 1. 005 + 1. 016 + 1. 01 4 Quarter 2018 Ratio 2019 Ratio 2020 Ratio 2021 Ratio 2 100/97 = 1.031 1.026 1.005 1.005 (1. 031 + 1. 026 + 1. 005 + 1. 00 3 95/97 = 0. 979 0.984 0.984 0.984 (0. 979 + 0. 984 + 0. 984 + 0. 98 4 95/97 = 0. 979 0.984 0.995 0.995 (0. 979 + 0. 984 + 0. 995 + 0. 99 Average Ratio 4 4 4 1. 012 + 1. 017 + 0. 983 + 0. b. Year Annual Demand 2018 388 2019 378 2020 374 2021 374 Forecast for 2022 1 st (−4. 6 × 2022 + 9668. 2) Quarter = × 1. 012 = 92. 85 4 Forecast for 2022 2 nd (−4. 6 × 2022 + 9668. 2) Quarter = × 1. 017 = 93. 31 4 Forecast for 2022 4 th (−4. 6 × 2022 + 9668. 2) Quarter = × 0. 988 = 90. 65 4 Page 87 Techniques for Cycles Cycles are wavelike movements, similar to seasonal variations, but of longer duration—say, two to six years between peaks. When cycles occur in time series data, their irregularity makes it difficult or impossible to project them from past data because turning points are difficult to identify. A short moving average or a naïve approach may be of some value, although both will produce forecasts that lag cyclical movements by one or several periods. The most commonly used approach is associative models: Search for another variable that relates to, and leads, the variable of interest. For example, the number of housing starts (i.e., permits to build houses) in a given month often is an indicator of demand a few months later for products and services directly tied to construction of new homes (e.g., sales of new major appliances; new demands for shopping locations, transportation, and schools). Thus, if an organization is able to establish a high correlation with such a leading variable (i.e., changes in the variable precede changes in the variable of interest), it can develop an equation that describes the relationship, enabling forecasts to be made. It is important that a persistent relationship exist between the two variables. Moreover, the stronger the correlation, the better the chances that the forecast will be accurate. 3.6 Associative Models LO6 Describe associative models (regression) and solve typical problems. Associative models rely on identification of related variables that can be used to predict values of the variable of interest. For example, sales of beef are related to the price of beef and the prices of substitutes such as chicken, pork, and lamb; sales during promotions depend on the discount and size of the ad; real estate prices are usually related to property location and square footage; and crop yields are related to soil conditions and the amounts and timing of rain and fertilizer applications. The essence of associative models is the development of an equation that summarizes the Page 88 effects of predictor variables on the variable of interest. The primary method of analysis is re gression. Simple Linear Regression The simplest and most widely used form of regression involves a linear relationship between two variables. The word “simple” indicates that there is only one predictor (independent) variable to explain the variation in the variable of interest. A plot of the values might appear like that in Figure 3-9. The objective in linear regression is to obtain an equation of a straight line that minimizes the sum of squared vertical deviations of data points (x, y) from the line. This least square s line has the equation ŷ = a + bx (3-8) where ŷ = Predicted (dependent) variable x = Predictor (independent) variable b = Slope of the line a = Value of ŷ when x = 0 (i.e., the y-intercept) FIGURE 3-9 A straight line is fitted to a set of points, each a pair (x, y). (Note: It is conventional to represent values of the predicted variable on the y axis and values of the predictor variable on the x axis.) Figure 3-10 illustrates the linear regression equation. FIGURE 3-10 Equation of a straight line Page 89 The coefficients a and b of the line are computed using these two equations: n(∑ xy) − (∑ x)(∑ y) b = 2 n(∑ x ) − (∑ x) 2 (3-9) (3-10) ∑y − b∑x a = ¯ ¯ ory − bx n where n = Number of paired observations (x, y) = The symbols showing a pair of observations and : The average values for the and components x y x y ¯ ¯ EXAMPLE 3-11 Healthy Hamburgers has a chain of 12 stores. Revenue and profit for the stores are given below. Obtain a regression line for the data, and predict profit for a store with revenue of $10 million. Revenue, x Profit, y (in millions of dollars) 7 0.15 2 0.10 6 0.13 4 0.15 14 0.25 15 0.27 16 0.24 12 0.20 14 0.27 20 0.44 15 0.34 7 0.17 SOLUTION First, plot the data and decide if a linear model is reasonable. (That is, do the points seem to scatter around a straight line? Figure 3-11 suggests they do.) Next, compute 2 the quantities ∑x, ∑y, ∑xy, and ∑x and substitute into Formula 3-9 and Formula 3-10 to find: n(∑ x y ) − (∑ x )(∑ y ) b = n(∑ x 2 ) − (∑ x ) = 0.01593 12(1,796) − 132(132) ∑ y − b(∑ x ) a = 12(35.29) − 132(2.71) = 2 2.71 − 0.01593(132) = n = 0.0506 12 FIGURE 3-11 A linear model seems reasonable for Example 3-11. Thus, the regression equation is: ŷ = 0.0506 + 0.01593x . For revenue of x = 10 (i.e., $ 10million), estimated profit is: ŷ = 0.0506 + 0.01593 (10) = 0.2099, or $209,900. (It may appear strange that substituting x = 0 into the equation produces a predicted profit of $50,600 because it seems to suggest that profit will occur with no sales. However, the value of x = 0 is outside the range of observed values. The regression line should be used only for the range of values from which it was developed; the relationship may be nonlinear outside that range. The purpose of the a value is simply to establish the height of the line where it crosses the y axis.) Figure 3-12. The symbol r The Excel template of this problem on Connect is shown in represents correlation between x and y, and will be described next. The regression coefficients b and a can also be directly obtained in Excel using “=slope(RangeY,RangeX)” and “=intercept(RangeY,RangeX)” functions, respectively, where RangeY is the range of Excel cells containing the y values and RangeX is the range of Excel cells containing the x values. FIGURE 3-12 Excel template for Example 3-11. Source: Microsoft Corporation Page 90 Correlation Coefficient Correlation coefficient measures the strength, as well as the direction, of the relationship between two variables, and can range from −1.00 to +1.00. A positive correlation coefficient indicates that the two variables move in the same direction (increase or decrease together). A negative correlation coefficient means the two variables move in opposite directions (when one increases, the other one tends to decrease, and vice versa). The closer the correlation coefficient is to −1.00 or 1.00, the stronger the linear relationship between the two variables. When the correlation coefficient is 1.00 (or −1.00), it means there are no differences between the actual and predicted values of the variable of interest (there are no errors). A correlation coefficient of +1.00 indicates that changes in one variable are always matched by changes in the other variable in the same direction (the strongest positive linear relationship); a correlation coefficient of −1.00 indicates that increases in one variable are matched by decreases in the other variable (the strongest negative linear relationship); and a correlation coefficient close to zero indicates little linear relationship between two variables. If a causal model is to be used to forecast the demand for an item (y), it is important that the relationship between the x and y variables is strong. The correlation coefficient between two variables can be computed using the equation: n(∑ xy) − (∑ x)(∑ y) r = (3-11) √ n(∑ x 2 ) − (∑ x) 2 ⋅ √ n(∑ y 2 ) − (∑ y) 2 The square of the correlation coefficient, r2, provides a measure of the proportion of variability in the values of y that is “explained” by the independent variable. The possible values of r2 range from 0 to 1.00. The closer r2 is to 1.00, the greater the proportion of explained variation. A high value of r2, say 0.80 or more, would indicate that the independent variable is a good predictor of values of the dependent variable. A low value, say 0.25 or less, would indicate a poor predictor, and a value between 0.25 and 0.80 would indicate a moderate predictor. The correlation coefficient can be obtained in Excel using the “=CORREL(RangeY,RangeX)” function, where RangeY is the range of Excel cells containing the y values and RangeX is the range of Excel cells containing the x values. Similarly, r2 can be obtained in Excel using the “=RSQ(RangeY,RangeX)” function. Page 91 Standard Error of the Estimate Each prediction made using a sample of data is called a point estimate. A point estimate is only the expected value of the dependent variable at any point specified by the independent variables. One indication of how accurate a prediction might be for a linear regression line is the amount of scatter of the data points around the line. If the data points tend to be relatively close to the line, predictions using the linear equation will tend to be more accurate than if the data points are widely scattered. The scatter can be summarized using the standard error of the estimate. It can be computed by finding the vertical difference between each data point and the computed value of the regression equation for that value of x, squaring each difference, adding the squared differences, dividing by n − 2, and then finding the square root of that value. Se = √ ∑(y−ŷ) 2 n−2 where Se = standard error of estimate y = value of each data point and ŷ is the computed value at that point n = number of data points (3-12) EXAMPLE 3-12 Monthly sales of LCD television sets in a store and the unemployment rate in the region are shown below for 11 months. Determine if unemployment levels can be used to predict demand for LCD TVs and, if so, derive the correlation coefficient and the predictive equation (the least squares line equation). Also, find the standard error of the estimate for the least squares line. Month 1 2 3 4 5 6 7 8 9 10 11 Units sold (y) 20 41 17 35 25 31 38 50 15 19 14 Unemployment % (x) 7.2 4.0 7.3 5.5 6.8 6.0 5.4 3.6 8.4 7.0 9.0 SOLUTION 1. Plot the data to see if a linear model seems reasonable. In this case, a linear model seems somewhat appropriate. 2. Compute the correlation coefficient: 11(1,750.8) − 70.2(305) r = = −0.966 √ 11(476.3) − (70.2) 2 ⋅ √ 11(9,907) − (305) 2 This is a high negative correlation, indicating a strong downward-sloping linear relationship. 3. Compute the regression line: b = a = ŷ = 11(1,750.8)−70.2(305) 11(476.4)−70.2(70.2) 305−(−6,9145)(70.2) 11 = −6.91 = 71.85 71.85 − 6.91x Note that the equation pertains only to unemployment levels in the range 3.6–9.0 percent, because sample observations cover only that range. 4. Compute the standard error of the estimate: Using the regression line found in the previous question, we can find the estimate for each data point. This is summarized in the table below. Month 1 2 3 4 5 6 7 8 9 10 11 Units sold (y) 20 41 17 35 25 31 38 50 15 19 14 Unemployment % (x) 7.2 4.0 7.3 5.5 6.8 6.0 5.4 3.6 8.4 7.0 9.0 estimated units sold (ŷ) 22.1 44.2 21,.4 33.8 24.9 30.4 34.5 47 13.9 23.5 9.7 Based on the data and estimate as S e = √ Equation 3-12 we calculate the standard error of the 97. 34 . = 3. 29 11 − 2 Page 92 Comments on the Use of Simple Linear Regression Analysis Use of simple regression analysis implies that certain assumptions have been satisfied. Basically, these are as follows: 1. Variations around the line are random. If they are random, no patterns such as cycles or trends should be apparent when the line and data are plotted. 2. Deviations around the average value (i.e., the line) should be normally distributed. A concentration of values close to the line with a small proportion of larger deviations supports the assumption of normality. 3. Predictions are being made only within the range of observed values. If the assumptions are satisfied, regression analysis can be a powerful tool. To obtain the best results, observe the following: 1. Always plot the data to verify that a linear relationship is appropriate. 2. The data may be time-dependent. Check this by plotting the dependent variable versus time; if patterns appear, you can use analysis of time series instead of regression. 3. A small correlation may imply that other (or additional) variables are important. Multiple Regression Simple linear regression may prove inadequate to handle certain problems because more than one predictor variable may be needed. Models that involve more than one predictor require the use of multiple regression. While this is beyond the scope of this text, you should be aware that it is often used. The computations lend themselves more to computers than to hand calculation. It is necessary to weigh the additional cost and effort against potential improvements in accuracy of predictions. In general, multiple linear regression with k predictors has the equation ŷ=a+b x +b x +⋯+b x 1 1 2 2 k k (3-13) where ŷ = predicted (dependent) variable xi = the ith predictor (independent) variable bi = the coefficient for the ith predictor variable a = value of ŷ when x = 0 (i.e., the y-intercept) Page 93 Forecasting with Economic Indicators One application of regression in forecasting relates to the use of indicators. These are uncontrollable variables that tend to lead or precede changes in a variable of interest. For example, changes in the interest rate determined by the Bank of Canada can influence certain business activities. Similarly, an increase in energy costs can lead to price increases for a wide range of products and services. Careful identification and analysis of indicators may yield insight into possible future demand in some situations. There are numerous published indexes and indicators that could be studied used in a forecasting analysis. Some examples include net change in inventories on hand and on order, interest rates for commercial loans, industrial output, consumer price index (CPI), the wholesale price index, stock market prices, and so on. Other potential indicators are population shifts, local political climates, and activities of other firms (e.g., the opening of a shopping centre may result in increased sales for nearby businesses). Three conditions are required for an indicator to be valid: 1. The relationship between movements of the indicator and movements of the dependent variable (variable of interest) should have a logical explanation. 2. Movements of the indicator must precede movements of the dependent variable by enough time so that the forecast isn’t outdated before it can be acted upon. 3. A fairly high correlation should exist between the indicator and the dependent variable. See the “ Mark’s” OM in Action for an interesting forecasting application. OM in ACTION Mark’sD Mark’s Work Wearhouse started as a work wear store in Calgary in 1977 but has since taken a new name, going simply by Mark’s, and has expanded its merchandise to include casual, business, sports, and outdoor apparel for both men and women. It now has over 385 stores throughout Canada, more than 6,300 employees, and revenue of over $1 billion a year. Such a drastic expansion has put considerable strain on its supply chain management software to forecast demand accurately and have the right merchandise in the right store at the right time. Every region has different apparel needs. For example, in downtown Toronto, work wear is khaki pants and a golf shirt, but in the oil fields around Edmonton, guys covered headto-foot in oil will jump out of pick-up trucks in search of new clothes. Mark’s sells a lot more rain wear in Vancouver than in Saskatoon. Sizes also vary regionally. Mark’s stores in British Columbia cater to a significant Asian population and smaller sizes are a steady part of the mix in the stores. In Gallic Quebec, customers tend to be of average stature, while in the prairie and mountain provinces, “they grow ’em big.” These are the reasons why Mark’s needs good forecasting, fulfillment, and merchandising software. In the 1990s, Mark’s was using INFOREM, IBM’s inventory and forecasting software which ran on an IBM mainframe computer. However, the forecasting module was not used effectively and INFOREM did not have the analytics and merchandising capabilities Mark’s needs. Mark’s was incurring significant costs for free delivery of out-of-stock merchandise to its customers’ homes under Mark’s Fastfind program. Since then, Mark’s has bought and installed various software from JDA, including JDA Demand, JDA Size Scaling, and JDA Fulfillment. JDA Demand is the forecasting module. JDA Size Scaling uses store-level data on sizes of apparel purchased to determine which size fits each store. It also determines what percentage of merchandise should be distributed at season-opening and what percentage should be kept in the Mark’s distribution centres (DCs) for in-season replenishment. JDA Fulfillment is basically distribution requirements planning (DRP)—that is, using each store’s weekly time-phased forecast for the coming season, it works backward and plans the distribution of apparel, the required inventory in Mark’s DCs, and the required replenishments from Mark’s suppliers (more on DRP in Chapter 13). The demand for most of Mark’s products, such as winter clothing and boots or summer shorts, is affected by the season. Mark’s started using weather intelligence information from Planalytics to fine-tune its seasonal merchandising, assortment, and allocation planning for some of its products. Mark’s buyers have found this information useful. For example, recently a men’s buyer had to decide on the discount price for shorts for a Father’s Day flyer to be printed in May. Usually, all shorts would have been offered at a 50 percent discount. However, the prediction from Planalytics was for a colder-thanusual spring and warmer-than-usual summer. Based on this, the buyer took a chance and discounted only some types of the shorts 25 percent. The weather prediction came true, resulting in fewer sales of shorts in spring; however, all the remaining shorts were sold in the summer at full price. This action resulted in $50,000 more profit. Also, because the forecast called for a warmer summer in Western Canada, 8,000 additional shorts were diverted to the Western Canada stores, and all were subsequently sold. In another example, winter was predicted to be less severe. This resulted in Mark’s buying more removable-liner jackets and fewer fixed-liner jackets. Planalytics also provides how much more or less a product will sell during a season; for example, 20 percent more demand for cotton fleece. Toronto-Images.Com/Shutterstock 3.7 Accuracy and Control of Forecasting Process Page 94 LO7 Describe three measures of forecast accuracy and two ways of controlling forecasts, and solve typical problems. Accuracy and control of the forecasting process are vital aspects of forecasting. Forecasting accuracy is the degree of correctness of the forecasts generated by the forecasting process. The large number of factors usually influencing the demand for a product or spare part, and random variations, make it almost impossible to correctly predict future values of demand on a regular basis. Consequently, it is important to include the extent to which the forecast might deviate from the actual value. This will allow the forecast user to better prepare for probable values of demand, provided that this deviation is not too large (i.e., the forecasting process is accurate enough). Accurate forecasts are necessary for the success of daily activities of every organization. Forecasts are the basis for an organization’s schedules, and unless the forecasts are accurate enough, schedules will be generated that may provide for too few or too many resources, too little or too much output, the wrong output, or the wrong timing of output, all of which can lead to additional costs, dissatisfied customers, and headaches for managers. A related concept is control of the forecasting process. Assuming that a forecasting process was initially accurate enough, it is important to monitor forecast errors through time to ensure that the errors remain within reasonable bounds (i.e., the forecasting process remains accurate enough). If errors are not within reasonable bounds, it will be necessary to take corrective action. Both accuracy and control of the forecasting process require measurement of forecast errors. Forecast error is the difference between the value that actually occurs and the value that was forecasted for a given time period. Hence, Forecast error = Actual value − Forecast value: et = At − Ft (3-14) Positive errors result when the forecast is too low relative to the actual value, whereas negative Page 95 errors result when the forecast is too high relative to the actual value. For example, if actual demand for a month is 100 units and forecast demand was 90 units, the forecast was too low; the forecast error is 100 − 90 = +10. Accuracy of the Forecasting Process Accuracy (or better, inaccuracy) of the forecasting process is measured using three alternative forecasterror summaries: mean absolute deviation (MAD), mean squared error (MSE), and mean absol ute percent error (MAPE). MAD is the average absolute forecast error, MSE is the average of squared forecast errors, and MAPE is the average absolute percent forecast error. The formulas used to compute MAD, MSE, and MAPE are:1 ∑|Actual − Forecast| (3-15) MAD = n ∑(Actual − Forecast) 2 (3-16) MSE = n (3-17) |Actual − Forecast| ∑[ ] × 100 Actual MAPE = n where n is the number of periods. MAD and MSE are similar to the standard deviation and variance of the forecast error, respectively. Example 3-13 illustrates the calculation of MAD, MSE, and MAPE. EXAMPLE 3-13 Calculate MAD, MSE, and MAPE for the following data. |Error| Period Actual Forecast Forecast Error (A−F) |Error| Forecast Error2 1 217 215 2 2 4 0.92% 2 213 216 −3 3 9 1.41% 3 216 215 1 1 1 0.46% 4 210 214 −4 4 16 1.90% 5 213 211 2 2 4 0.94% 6 219 214 5 5 25 2.28% 7 216 217 −1 1 1 0.46% 2 212 216 −4 4 16 1.89% −2 22 76 10.26% SOLUTION Using the numbers shown in the above table, × 100 Actual ∑|e| MAD = 22 = n ∑e MSE = = 2.75 8 2 76 = n = 9.5 8 |e| ∑[ × 100] Actual MAPE = 10.26% = n = 1.28% 8 From a computational standpoint, the difference between these three measures is that MAD weighs all errors equally, MSE weighs errors according to their squared values, and MAPE weighs errors relative to their actual values. Because MAD and MSE depend on the scale of data (unit of measurement), it is not meaningful to compare the MAD or MSE of two different time series variables. However, we can compare the accuracy of two different forecasting techniques for the same time series variable: A lower value for MAD or MSE implies a more accurate forecasting technique. For an example, see Solved Problem 8. MAPE can be used to measure forecasting accuracy irrespective of the specific time series data used. For example, the accuracy of the forecasting process resulting in the forecasts given in Page 96 Example 3-13 is 100 − MAPE = 100 − 1.28 = 98.72%, a very accurate forecasting process. In practice, accuracy above 70 percent is considered satisfactory. A related concept to forecasting accuracy is the sum of forecast errors, sometimes called bias. A persistently positive bias implies that forecasts frequently underestimate the actual values, and a persistently negative bias implies that forecasts frequently overestimate the actual values. Bias occurs because either demand pattern has changed or the way forecasts are determined is flawed. For example, if forecasts are based on salespeople’s opinions, the way their budget is determined tends to influence their forecasts: for new products they tend to underestimate the demand, and for declining products they tend to overestimate the demand.2 The above statements about MAD, MSE, and MAPE assume negligible bias. If bias is substantial, it will reduce the accuracy of the forecasting process. For Example 3-13, Bias = −2, which is very small relative to the scale of demand (over 210). It is important to reduce the bias in order to improve the accuracy of the forecasting process. Controlling the Forecasting Process It is necessary to monitor forecast errors to ensure that the forecasting process is performing adequately and remains accurate enough. If not, corrective action should be taken. Tracking the forecast errors and analyzing them can provide useful insight on whether forecasts are performing satisfactorily. There are a variety of possible sources of forecast errors, including the following: 1. The model may be inadequate due to (1) the omission of an important variable, (2) a change or shift in the variable that the model cannot deal with (e.g., sudden appearance of a trend or cycle), or (3) the appearance of a new variable (e.g., new competitor), and so on. 2. Irregular variations may occur due to severe weather or other natural phenomena, temporary shortages or breakdowns, catastrophes, or similar events. 3. Random variations. Randomness is the inherent variation that remains in the data after all causes of variation have been accounted for. There are always random variations. See the “ New Disruptions in Demand Forecasting” OM in Action for an example about different sources of variation playing a role in complicating the process of forecasting for seasonal items. OM in ACTION New Disruptions in Demand ForecastingE New Africa/Shutterstock In recent years, Canadian winter sport vehicle and apparel retailers have been finding it more difficult to produce accurate forecasts for their demand and sales volumes. This is due to disruptions and variations from different sources influencing sales numbers. One of these sources is climate change. Climate change (besides other factors such as growth of online sales, economic uncertainty, etc.) plays a major role in creating a new level of uncertainty faced by these retailers. Climate change has resulted in unexpected, unusual, extreme, unpredictable, and unseasonal weather. Unusually warm and dry winters, early or late starts to the season, and other factors contribute to unpredictable fluctuation in demand for winter products. This could severely disrupt any forecasting and planning efforts by these retailers. These dramatic changes could also affect purchasing decisions made by retailers in the following years. Also, warmer than normal winters can force retailers to offer aggressive discounts to help dealers clear showrooms before the introduction of new models. Without cold and snow, Canadians tend to delay purchases and may even skip a year for major purchases or updates (e.g., snowmobiles, snowblowers, etc.). With the reality of climate change affecting their environment, Canadian retailers of winter products need to factor in the effects of more major weather fluctuations in their planning and demand forecasts. Ski resorts and winter sports facilities are also among Canadian businesses that have been severely affected by climate change and the forecasting challenges it has caused. Ski resorts in British Columbia are dealing with unusual patterns in snowfall as well as temperature, which make it difficult to correctly predict resort conditions and plan for a ski season. For example, in 2015 the lack of snow caused Cypress Mountain, a ski resort in west Vancouver, to close its doors in February, with conditions in other ski resorts not much better. Although varying periods of snowfall can improve resort conditions, businesses still require stability in weather conditions to develop forecasts of demand and manage supply, something that has been disrupted by climate change. A forecast is generally deemed to perform adequately when the errors exhibit only random Page 97 variations. Hence, the key to judging when to re-examine the validity of a particular forecasting technique is whether forecast errors are random. If they are not random, it is necessary to investigate to determine which of the other sources is present and how to correct the problem. Monitoring forecast errors is usually accomplished by either a control chart or a tracking signal. Control Chart A control chart for forecast errors is a time series plot of forecast errors where they are compared to two predetermined values, or control limits. Forecast errors that fall outside either control limit signal that errors occurred with reasons other than random variation in data, and thus, corrective action is needed. Corrective action is needed if there is strong evidence against the following two assumptions: 1. Forecast errors are randomly distributed around a mean of zero (i.e., there is no bias). 2. The distribution of forecast errors is normal. See Figure 3-13. FIGURE 3-13 Conceptual representation of a control chart In order for the forecast errors to be judged “in control” (i.e., random), two things are necessary. One is that all errors are within the control limits. The other is that no patterns (e.g., trends, cycles, noncentred data) are present. Both can be accomplished by inspection. examples of nonrandom errors. Figure 3-14 illustrates some Page 98 FIGURE 3-14 Examples of nonrandomness The control limits are usually chosen as a multiple of the standard deviation of forecast errors. The square root of MSE is used in practice as an estimate of the standard deviation of forecast errors.3 That is, (3-18) s = √ MSE Recall from your statistics course that for a normal distribution, approximately 95 percent of the values (forecast errors in this case) fall within the average (0 in this case for the forecast errors), or limits of 0 ± 2s (i.e., 0 ± 2 standard deviations). This is because the average of forecast errors is 0. Also, approximately 99.7 percent of the values fall within ±3s of zero. Hence, if the forecasting process is “in control,” 99.7 percent or 95 percent of the forecast errors should fall within the control limits, depending on whether 3s or 2s control limits are used. With that in mind, the following formulas can be used to obtain the upper control limit (UCL) and the lower control limit (LCL) for the errors of a forecast: UCL: 0 + z√ MSE LCL: 0 − z√ MSE where z = Number of standard deviations from the mean EXAMPLE 3-14 Compute 2s control limits for forecast errors when the MSE is 9.0. SOLUTION The 2s control limits should correspond to approximately 95 percent of all forecast errors. This produces the following UCL and LCL values. s = √ MSE = √ 9 = 3 UCL = 0 + 2(3.0) = +6.0 LCL = 0 − 2(3.0) = −6.0 Page 99 EXAMPLE 3-15 Monthly sales of leather jackets at a store for the past 24 months, and forecasts and forecast errors for those months, are shown below. Determine if the forecasting technique is satisfactory using a control chart with 2s limits. Use data from the first eight months to develop the control chart, then evaluate the remaining data with the control chart. Month A (Sales) F (Forecast) A − F (Error) 1 47 43 4 2 51 44 7 3 54 50 4 4 55 51 4 5 49 54 −5 6 46 48 −2 7 38 46 −8 8 32 44 −12 9 25 35 −10 10 24 26 −2 11 30 25 5 12 35 32 3 13 44 34 10 14 57 50 7 15 60 51 9 16 55 54 1 17 51 55 −4 18 48 51 −3 19 42 50 −8 20 30 43 −13 21 28 38 −10 22 25 27 −2 23 35 27 8 24 38 32 6 −11 SOLUTION 1. Make sure that the average forecast error is approximately zero: ∑ errors Average error = −11 = = −0.46~0 relative to magnitude of sales. n 24 2. Compute the standard deviation of forecast errors using the first eight months: s = √ MSE = √ ∑e 2 n = √ ∑4 2 + 7 2 + 4 2 + 4 2 + (−5) 2 + (−2) 2 + (−8) 2 + (−12) 2 = 6.46 8 3. Determine 2s control limits: 0 ± 2s = 0 ± 2(6.46) = −12.92to + 12.92 4. i. Check that all forecast errors are within the control limits. Month 20’s forecast error (−13) is just below the lower control limit (−12.92). ii. Check for nonrandom patterns. Note the runs of positive and negative errors in the following plot. This suggests nonrandomness (and that a better forecasting technique is possible). (We present more on control charts in Chapter 10.) Tracking Signal An alternative measure to control the forecasting performance is a tracking signal. It relates the cumulative forecast error to the average absolute error (i.e., MAD). The intent is to detect any bias in errors over time (i.e., a tendency for a sequence of errors to be positive or negative). The tracking signal is computed period by period using the following formula: ∑(Actual − Forecast) TS = MAD ∑e = MAD Values of the tracking signal can be positive or negative. A value of zero would be ideal; limits of ±4 or ±5 are often used for a range of acceptable values of the tracking signal. If a value outside the acceptable range occurs, that would be taken as a signal that there is bias in the forecast, and that corrective action is needed. Corrective action includes resetting initial values for forecasts, changing parameters such as the smoothing constant α to make the forecasting technique more responsive, using a different forecasting technique, etc. Comment. The control chart approach is generally superior to the tracking signal approach. A Page 100 major weakness of the tracking signal approach is its use of cumulative errors: Individual errors can be obscured so that large positive and negative values cancel each other. Conversely, with control charts, every error is judged individually. Thus, it can be misleading sometimes to rely on a tracking signal approach to monitor errors. 3.8 Choosing a Forecasting Technique LO8 Identify the major factors to consider when choosing a forecasting technique. Many different kinds of forecasting techniques are available, and no single technique works best in every situation. When selecting a technique for a given situation, the manager or analyst must take a number of factors into consideration. The two most important factors are cost and accuracy. Cost is affected by the preparation time and complexity. Questions to ask are: How much money is budgeted for generating the forecast? What are the possible costs of errors, and what are the benefits that might accrue from an accurate forecast? Generally speaking, the higher the accuracy, the higher the cost, so it is important to weigh cost– accuracy trade-offs carefully. The best forecast is not necessarily the most accurate or the least costly; rather, it is some combination of accuracy and cost deemed best by the management. Other factors to consider in selecting a forecasting technique include the availability of historical data; the availability of computer software; and the time needed to gather and analyze data and to prepare the forecast. In addition, the forecast horizon is important because some techniques are more suited to long-term forecasts, while others work best for the shorter term. For example, moving average and exponential smoothing are essentially short-term techniques, since they produce forecasts for the next period. Regression trend models can be used to project over much longer time periods. If there is a strong and stable cause-and-effect relationship, then causal regression models could be used. Also, if the objective of forecasting is to understand what drives sales, then regression should be used. Several of the judgmental techniques are well suited for long-term forecasting because they do not require historical data. The Delphi method and executive opinion methods are often used for long-term planning. New products and services lack historical data, so forecasts for them must be based on subjective estimates. Table 3-2 provides a guide for selecting an appropriate forecasting method. additional perspectives on forecasts in terms of the forecasting horizon. Table 3-3 provides TABLE 3-2 A guide to selecting an appropriate forecasting method Forecasting Amount of Method Historical Data Simple 5 to 10 observations exponential smoothing Forecasting Preparation Data Pattern Horizon Time Complexity Data should be Short Short Little stationary sophistication Forecasting Amount of Method Historical Data Trend-adjusted 10 to 15 observations Forecasting Preparation Data Pattern Horizon Time Complexity Trend Short to Short Moderate exponential medium sophistication smoothing Regression trend 10 to 20 Trend models observations Seasonal Enough Seasonal observations to see patterns Short, Short medium, long Medium Moderate sophistication Short to Moderate moderate sophistication Long Considerable two peaks and troughs Causal 10 observations per Can handle Medium or regression independent complex long models variable patterns sophistication Source: Adapted from J. Holton Wilson and D. Allison-Koerber. “Combining Subjective and Objective Forecasts Improves Results.” Journal of Business Forecasting Methods & Systems 11(3), Fall 1992, 4. Page 101 TABLE 3-3 Forecast perspectives, by forecasting horizon Factor Short Term Medium Term Long Term 1. Frequency Daily, weekly Monthly, quarterly Annual 2. Level of aggregation Item Product family Total output 3. Type of model Smoothing, trend, Trend and seasonal Managerial judgment, regression regression trend, regression Low Moderate High Low Moderate High 4. Degree of management involvement 5. Cost per forecast Source: Adapted from C. L. Jain. “Benchmarking Forecasting Models.” Journal of Business Forecasting Methods & Systems, Fall 2002, 18–20, 30. In some instances, a manager might use more than one forecasting technique to obtain independent forecasts. If the different techniques produced approximately the same predictions, that would give increased confidence in the results; disagreement among the forecasts would indicate that additional analysis may be needed. The chosen forecasting technique should be tested before use to ascertain the level of accuracy. Using Forecast Information A manager can take a reactive or a proactive approach to a forecast. A reactive approach views forecasts as probable descriptions of future demand, and a manager reacts to meet that demand (e.g., adjusts production rates, inventories, the workforce). Conversely, a proactive approach seeks to actively influence demand (e.g., by means of advertising, pricing, or goods/service changes). Generally speaking, a proactive approach requires either a causal model (e.g., regression) or a subjective assessment of the influence on demand. It is possible that a manager might use two forecasts: one to predict what will happen under the status quo, and a second one based on a “what-if” approach. Computers in Forecasting Computers play an important role in preparing forecasts based on quantitative data. Their use allows managers to develop and revise forecasts quickly and without the burden of manual calculations. There is a wide range of software packages available for forecasting.4 Installing an enterprise software solution (including the forecasting module) is a large undertaking and many things can potentially go wrong. For an example, see the “ Nike” OM in Action below. OM in ACTION NikeF A few years ago, Nike CEO Philip Knight launched a blistering attack on i2 Technologies (now part of JDA Software) for implementation issues relating to a demand forecasting application. The forecasting application did not perform as expected, resulting in severe shortages of some popular shoe models and excess stock of slow-selling models. Nike chose to work with software vendor i2 as part of a $400 million overhaul designed to streamline communications and collaborate forecasting with upstream suppliers and downstream retail stores. The software failed to meet expectations, both in performance and in functionality. Some orders were placed twice, once by the old system and once by the new system. In addition, the application consistently failed to submit new orders for new shoe models, forcing Nike to expedite the production of those models at the last minute and ship them by airfreight. Nike’s stock dropped nearly 20 percent on the news. 3.9 Forecasting and Supply Chain Page 102 LO9 Describe the importance of forecasting in supply chains. Forecasts are the basis for many decisions and an essential input for matching supply and demand. Clearly, the more accurate an organization’s forecasts, the better prepared it will be to take advantage of future opportunities and reduce potential risks. A worthwhile strategy can be to work to improve shortterm forecasts. Better short-term forecasts will not only enhance profits through lower inventory levels, fewer shortages, and improved customer service, they also will enhance forecasting credibility throughout the organization: If short-term forecasts are inaccurate, why should other areas of the organization put faith in long-term forecasts? Also, the sense of confidence that accurate short-term forecasts would generate would allow allocating more resources to strategic and medium- to longer-term planning and less on short-term, tactical activities. Maintaining accurate, up-to-date information on prices, demand, and other variables can have a significant impact on forecast accuracy. An organization also can do other things to improve forecasts. These do not involve searching for improved techniques but relate to the inverse relation of accuracy to the forecast horizon: Forecasts that cover shorter time frames tend to be more accurate than longerterm forecasts. Recognizing this, management might choose to devote efforts to shortening the time horizon that forecasts must cover. Essentially, this means shortening the lead time needed to respond to a forecast. This might involve building flexibility into operations to permit rapid response to changing demands for products and services, or to changing volumes in quantities demanded; shortening the lead time required to obtain supplies, equipment, and raw materials, or the time needed to train or retrain employees; or shortening the time needed to develop new products and services. Lean systems are demand driven; goods are produced to fulfill orders rather than to hold in inventory until demand arises. Consequently, they are far less dependent on short-term forecasts than more traditional systems. In certain situations, forecasting can be very difficult when orders have to be placed far in advance. This is the case, for example, when demand is sensitive to weather conditions, such as the arrival of spring, and there is a narrow window for demand. Orders for products or services that relate to this (e.g., garden materials, advertising space) often have to be placed many months in advance—far beyond the ability of forecasters to accurately predict weather conditions and, hence, the timing of demand. In such cases, there may be pressures from salespeople who want low quotas and from financial people who don’t want to have to deal with the cost of excess inventory to have conservative forecasts. Conversely, operations people may want more optimistic forecasts to reduce the risk of being blamed for possible shortages. Forecasting and the Supply Chain Accurate forecasts are important for the supply chain. Inaccurate forecasts can lead to shortages and excesses throughout the supply chain. Shortages of materials, parts, and services can lead to missed deliveries, work disruption, and poor customer service. Conversely, overly optimistic forecasts can lead to excesses of materials or capacity, which increase costs. Both shortages and excesses in the supply chain have a negative impact not only on customer service but also on profits. Furthermore, inaccurate forecasts can result in temporary increases and decreases in orders to the supply chain, which can be misinterpreted by the supply chain. Organizations can reduce the likelihood of such occurrences in a number of ways. One, obviously, is by striving to develop the best possible forecasts. Another is through collaborative planning and forecasting with major supply chain partners. Yet another way is through information sharing among partners and perhaps increasing supply chain visibility by allowing supply chain partners to have realtime access to sales and inventory information. Also important is rapid communication about poor forecasts, as well as about unplanned events that disrupt operations (e.g., flooding, work stoppages) and changes in plans. An example of an unplanned event is the recent COVID-19 pandemic that had catastrophic impacts on supply chains all over the world. The following two OM in Actions illustrate this disruption from two different perspectives. The “COVID-19 and Supply Chain Forecasting” OM in Action provides some insight into the change in demand patterns due to the pandemic, and how it impacted forecasting practices of supply chains. The pandemic also disrupted supplier operations and resulted in unexpected behaviours across many supply chains. An example of this is illustrated in the “Canadian Vehicle Sales and Irregular Variation Patterns” OM in Action. Supplier disruptions had long-lasting negative impacts on supply chain forecasting accuracy in the auto sector across the globe. Sharing forecasts or demand data throughout the supply chain can improve forecast quality in the supply chain, resulting in lower costs and shorter lead times. For example, both HewlettPackard and IBM require resellers to include such information in their contracts. OM in ACTION COVID-19 and Supply Chain ForecastingG Page 103 (left) Kevin McGovern/Shutterstock; (right) eldar nurkovic/Shutterstock The global COVID-19 pandemic changed supply chain forecasting systems dramatically. Companies quickly found themselves in situations where historical data were no longer indications of future customer demands and purchasing patterns. One of the ways in which the pandemic posed big risks to forecasting systems was the sudden increase in the popularity of online purchasing. A report by the World Trade Organization (WTO) released in 2020 showed that pandemic measures had driven customers online. According to a report by the Organization for Economic Co-operation and Development (OECD) released in 2020, by the end of May 2020 online orders had, on average, more than doubled year-over-year in North America and were up by 50 percent in Europe. This effect has continued to fuel more demand for online platforms in post-pandemic years. Not only did the adoption of online channels result in changes in volume and frequency of customer orders, it also resulted in changes in customer demand patterns, which did not necessarily resemble historical trends. While online ordering made it more convenient for many customers to purchase what they needed online, many companies across the globe suffered severe disruptions due to various pandemic-related issues. These disruptions included delayed or cancelled orders for materials and products, staff shortages, changes in working hours and regulations, and so on that made it difficult for many businesses to meet their demand. For example, many ecommerce business sourcing products from China experienced considerably longer lead times than was previously the case. The disruptions in supply and changes in demand patterns dramatically changed forecasting practices of supply chains. To safeguard their businesses against future disruptions, management at companies across different supply chains have started to adopt new practices. One of these practices is sharing forecasts among different players in a supply chain. While some companies may be reluctant to share forecast information with their upstream or downstream partners, it has been shown that coordination between companies in an integrated network can result in significant improvements in responsiveness and can reduce risk across the chain. Through sharing of forecasts, suppliers in the network can get closer to the markets and gain more granular data to identify new patterns in customer demand as they emerge, thereby improving their production/sourcing planning. This also helps supply chains to be more responsive and agile in adapting to changes in customers’ purchasing patterns and behaviours. Page 104 OM in ACTION Canadian Vehicle Sales and Irregular Variation PatternsH In the seventh Canadian edition this textbook, the OM in Action “Canadian Vehicle Sales” talked about the strong outlook for auto sales in Canada. Data indicated a yearover-year increase in sales of new cars in Canada, and the historic low interest rates set by Bank of Canada gave a very optimistic picture for the industry. The following is a quote from that text (page 74): Automobile sales are difficult to forecast because demand is cyclical in nature, [but] industry experts see strong indications that sales will continue to remain robust in the foreseeable future. Forecasts such as these are useful for vehicle manufacturers, parts suppliers, financial institutions, industry associations, and governmental institutions. In retrospect, we realize that what happened to Canadian auto sales was more than just a cyclical pattern in demand. Looking at the graph below, we can observe a slight dip in 2019 followed by a deep plunge in 2020. The numbers in 2021 improved slightly back to 2012 numbers. At the time of writing this text 2022 numbers are not out yet, but based on the data from the first 10 months, the improvement is at best modest. Source: Statistics Canada. Table 20-10-0001-01, New motor vehicle sales. The sharp decrease in auto sales during the pandemic was almost entirely due to the shortage in supply. According to research done by the online marketplace autotrader.ca, the pandemic caused a surge in demand for automobiles. This increase in demand was underpinned by a shortage in supply caused by a variety of factors, which in turn pushed the prices up on both new and used cars. The pandemic caused disruptions in supply chains all around the globe. Although most industries were affected by lack of supply and staffing issues, a survey conducted by the Economist Intelligence Unit and sponsored by Citi in 2021 indicated that the auto sector was hit the hardest by supply chain disruptions caused by the pandemic. Although in the post-pandemic era the auto sector is gradually recovering, the effect the pandemic left on the industry will be felt for years to come. The prices remain higher than usual going into 2023 and are expected to remain at that level for some time while the industry is on its path to recovery. The pandemic and its effect on the auto industry can serve as an example of irregular variations as a pattern in demand and component in time series described in LO3. Irregular variations are often unpredictable and may have dramatic (yet explainable) impacts on demand and supply patterns. Although their effects may be lingering for some time after their occurrences, it is recommended that we identify them and separate their effect from other time series components such as trend and seasonality when conducting forecasting analyses. In future forecasting analyses, the plunge in the sales of new cars in Canada observed in 2020 may not be a very helpful component as we know now that it was almost entirely attributed to the (hopefully) one-time global pandemic. SUMMARY Forecasts are vital inputs for the design and operation of the productive systems because they help managers anticipate the future. Page 105 Forecasting horizons are classified into long, medium, and short term. Forecasting techniques can be classified as judgmental or quantitative. Judgmental methods rely on judgment, experience, and expertise of executives, sales staff, experts, or consumers to formulate forecasts. The judgmental methods include executive opinions, sales force estimates, consumer surveys, historical analogies, and expert opinions. Quantitative techniques use precise numerical calculations to develop forecasts. Two major quantitative approaches are time series and associative (causal) techniques. The time series techniques rely strictly on the examination of historical data; predictions are made by projecting past patterns of a variable into the future, which includes averaging techniques (moving average and exponential smoothing), linear trend, and time series decomposition for seasonal data. Trend can be forecasted using simple regression and trend-adjusted exponential smoothing. Seasonal relatives can be computed using centred moving average or annual average. Associative techniques such as regression attempt to explicitly identify influencing factors and to incorporate that information into equations that can be used for predictive purposes. Measures of forecast accuracy include mean absolute deviation (MAD), mean squared error (MSE), and mean absolute percent error (MAPE). Control of forecasts involves deciding whether a forecast is performing adequately, using, for example, a control chart. When selecting a forecasting technique, a manager must choose a technique that will serve the intended purpose at an acceptable level of cost and accuracy. Table 3-4 lists the formulas used in the forecasting techniques and in the methods of measuring their accuracy. Page 106 TABLE 3-4 Summary of formulas Technique Formula D Naïve forecast for F t = A t−1 F = stable data Moving average F t−1 forecast = i=t−n Ft = Exponential N ∑ Ai n F t = F t−1 + α(A t−1 F − F t−1 ) smoothing forecast = S Linear trend forecast F t = a + bt F where S n ∑ ty − ∑ t ∑ y b = n∑t 2 − (∑ t) 2 ∑y − b∑t a = or y − bt̄ ¯ n Trend-adjusted TAF t+1 = S t + T t T exponential smoothing where f forecast S t = TAF t + α(A − TAF )T = T t t t t−1 + β(T AF − T AF t t−1 − T t−1 ) S c t p c Linear regression forecast x ŷ = a + bx v ( where N n(∑ xy) − (∑ x)(∑ y) b = 2 n(∑ x ) − (∑ x) 2 Technique Formula D ∑y − b∑x a = or y − bx ¯ ¯ n Standard error of the Se = √ ∑(y−ŷ) S 2 n−2 estimate y ŷ d o n MAD M ∑|e| e MAD = n n MSE ∑e M 2 MSE = n |e| MAPE ∑[ M × 100] Actual e MAPE = n Control limits UCL = 0 + z√ MSELCL = 0 − z√ MSE √ = d v Tracking signal ∑(Actual − Forecast) TS = ∑e = MAD MAD KEY TERMS adaptive (or variable response) exponential smoothing annual average method associative models bias centred moving average (CMA) control chart for forecast errors correlation coefficient cycles Delphi method demand forecast exponential smoothing forecast error forecasting horizon irregular variations judgmental methods least squares line level (average) linear trend equation mean absolute deviation (MAD) mean absolute percent error (MAPE) mean squared error (MSE) moving average naïve forecast predictor variables random variations regression seasonal relatives seasonal variations seasonality standard error of the estimate time series time series models tracking signal trend trend-adjusted exponential smoothing weighted moving average SOLVED PROBLEMS Page 107 Problem 1 Forecasts based on averages. Given the following data: Period Number of Complaints 1 60 2 65 3 55 4 58 5 64 Prepare a forecast using each of these approaches: a. The appropriate naïve approach. b. A three-period moving average. c. A weighted average using weights of 0.50 (most recent), 0.30, and 0.20. d. Exponential smoothing with a smoothing constant of 0.40. Solution a. This time series is stable. Therefore, the most recent value of the series can be used as the next forecast: 64. b. 55 + 58 + 64 MA 3 = c. F6 = 0.50(64) + 0.30(58) + 0.20(55) = 60.4 = 59 3 You can also obtain the exponential smoothing forecasts using the Excel template on Connect: Source: Microsoft Corporation Problem 2 Using seasonal relatives. An orchard ships boxed fruit regionally. Using the following Page 108 information, forecast shipments for the first four months of next year. Month Seasonal Relative Month Seasonal Relative January 1.2 July 0.8 Month Seasonal Relative Month Seasonal Relative February 1.3 August 0.6 March 1.3 September 0.7 April 1.1 October 1.0 May 0.8 November 1.1 June 0.7 December 1.4 The monthly trend forecast equation is estimated to be: y t = 402 + 3 t where t = 0 corresponds to January of two years ago yt = Trend value (number of boxes of fruits to ship) in month t Solution a. Determine trend amounts for the first four months of next year: January, t = 24; February, t = 25; etc. Thus, Y Jan = 402 + 3 (24) = 474 Y Feb = 402 + 3 (25) = 477 Y Mar = 402 + 3 (26) = 480 Y Apr = 402 + 3 (27) = 483 b. Multiply each monthly trend by the corresponding seasonal relative for that month. Month Seasonal Relative January 1.2 Forecast 474 (1.2) = 568.8 Month Seasonal Relative Forecast February 1.3 477 (1.3) = 620.1 March 1.3 480 (1.3) = 624.0 April 1.1 483 (1.1) = 531.3 Problem 3 Linear trend line. Plot the following data on a graph, and verify visually that a linear trend line is appropriate. Develop a linear trend equation. Then use the equation to predict the next two values of the series. Solution Period Demand 1 44 2 52 3 50 4 54 5 55 6 55 7 60 8 56 9 62 Page 109 A time series plot of the data indicates that a linear trend line is appropriate: Period, t Demand, y ty t2 1 44 44 1 2 52 104 4 3 50 150 9 4 54 216 16 5 55 275 25 6 55 330 36 7 60 420 49 8 56 448 64 9 62 558 81 45 488 2,545 285 n ∑ ty − ∑ t ∑ y b = 9(2,545) − 45(488) = n∑t 2 − (∑ t) 2 = 1.75 9(285) − 45(45) ∑y − b∑t a = 488 − 1.75(45) = = 45.47 n 9 Thus, the trend equation is y = 45.47 + 1.75t. The next two forecasts are: t y 10 = 45.47 + 1.75 (10) = 62.97 y 11 = 45.47 + 1.75 (11) = 64.72 You can also use the Excel template on Connect to obtain the regression coefficients and plot. Simply replace the existing data in the template with your data. Source: Microsoft Corporation Problem 4 Calculating seasonal relatives. Obtain estimates of quarterly relatives for these data: Year: 1 2 3 4 Quarter: 1 2 3 4 1 2 3 4 1 2 3 4 1 Demand: 14 18 35 46 28 36 60 71 45 54 84 88 58 Solution Page 110 Year Quarter Demand 1 1 14 2 18 28.25 3 35 4 2 3 4 CMA4 CMA2 Demand/CMA2 31.75 30.00 1.17 46 36.25 34.00 1.35 1 28 42.50 39.38 0.71 2 36 48.75 45.63 0.79 3 60 53.00 50.88 1.18 4 71 57.50 55.25 1.29 1 45 63.50 60.50 0.74 2 54 67.75 65.63 0.82 3 84 71.00 69.38 1.21 4 88 1 58 Quarter 1 Average for the quarter: 2 3 4 1.17 1.35 1.29 0.710 0.790 1.18 0.740 0.820 1.21 0.145 0.161 3.56 2.64 0.725 0.805 1.187 1.320 The sum of these relatives is 4.037. Multiplying each by 4.00/4.037 will scale the relatives, making their total equal 4.00. The resulting relatives are quarter 1, 0.718; quarter 2, 0.798; quarter 3, 1.176; quarter 4, 1.308. Problem 5 Causal regression analysis. A large retailer has developed a graph that displays the effect of advertising expenditures on sales volume. Using the graph, determine an equation of the form ŷ = a + bx that describes this relationship. Solution The linear equation has the form ŷ = a + bx where a is the value of ŷ when x = 0 (i.e., where the line intersects the y axis) and b is the slope of the line (the amount by which ŷ changes for a one-unit change in x). Accordingly, a = 1 and considering the points (x = 0, y = 1) and (x = 10, y = 3), b = (3 − 1)/ (10 − 0) = 0.2, so ŷ = a + bx becomes ŷ = 1 + 0.2x. [Note: (3 − 1) is the change in y, and (10 − 0) is the change in x.] Page 111 Problem 6 Causal regression analysis. The owner of a small hardware store has noted a weekly sales pattern for door locks that seems to move in parallel with the number of break-ins reported each week in the newspaper. The data are: Sales: 46 18 20 22 27 34 14 37 30 Break-ins: 9 3 3 5 4 7 2 6 4 a. Plot the data to determine which type of equation, linear or nonlinear, is appropriate. b. Obtain a linear regression equation for the data. c. Estimate sales if the number of break-ins in a week is five. Solution a. The graph supports a linear relationship. b. The computations for a straight line regression equation are: x y xy x2 9 46 414 81 3 18 54 9 3 20 60 9 5 22 110 25 4 27 108 16 7 34 238 49 2 14 28 4 x y xy x2 6 37 222 36 4 30 120 16 43 248 1,354 245 n(∑ xy) − (∑ x)(∑ y) b = 2 n(∑ x ) − (∑ x) 2 = 4.275 9(245) − 43(43) ∑ y − b(∑ x) a = 9(1,354) − 43(248) = 248 − 4.275(43) = n = 7.129 9 Hence, the equation is: ŷ = 7.129 + 4.275x . You can also obtain the regression coefficients using the appropriate Excel template on Connect. Simply replace the existing data for x and y with your data. Note: Be careful to enter the values for the variable you want to predict as y values. In this problem, the objective is to predict sales, so the sales values are entered in the y column. Page 112 Source:Microsoft Corporation For x = 5, ŷ = 7.129 + 4.275(5) = 28.50units. Problem 7 Control chart. Given the following demand data for a product, prepare a naïve forecast for periods 2 through 10. Then determine each forecast error, and use those values to obtain 2s control limits. If demand in the next two periods turns out to be 125 and 130 units, can you conclude that the forecasting process is not in control? Period: 1 2 3 4 5 6 7 8 9 10 Demand: 118 117 120 119 126 122 117 123 121 124 Solution For a naïve forecast, each period’s demand becomes the forecast for the next period. Hence, the forecasts and forecast errors are: Period Demand Forecast Error Error2 Period Demand Forecast Error Error2 1 118 — — — 2 117 118 −1 1 3 120 117 3 9 4 119 120 −1 1 5 126 119 7 49 6 122 126 −4 16 7 117 122 −5 25 8 123 117 6 36 9 121 123 −2 4 10 124 121 3 9 +6 150 The average forecast error (+6/9) is fairly small relative to size of demand (over 110). s = √ ∑ error n 2 = √ 150 = 4.08(n = Number of errors) 9 The control limits are ±2 × (4.08) = ±8.16. The forecast for period 11 is 124. Demand turned out to be 125, for a forecast error Page 113 of 125 − 124 = +1. This is within the limits of ±8.16. The next demand turned out to be 130 and the naïve forecast is 125 (based on the period 11 demand of 125), the forecast error is +5. Again, this is within the limits, so you cannot conclude that the forecasting technique is not in control. With more values—at least five or six—you could plot the forecast errors as a time series plot in a control chart to see whether you could detect any patterns suggesting the presence of nonrandomness or non-Normality. Problem 8 Accuracy and control of forecasting process. Compare the error performance of these three forecasting techniques using MAD, MSE, and MAPE: a naïve forecast, a two-period moving average, and exponential smoothing with α = 0.10 for periods 3 through 11, using the data shown in Example 3-3. Solution Naïve Tw Forecast (A–F) Forecast |Error|/Actual Error |Error| Error2 × 100% Period, t Demand Forecast 1 42 – 2 40 42 −2 2 4 5.00% 3 43 40 3 3 9 4 40 43 −3 3 5 41 40 1 6 39 41 7 46 8 Forecast Forecast Error 6.98% 41.00 2.00 9 7.50% 41.50 −1.50 1 1 2.44% 41.50 −0.50 −2 2 4 5.13% 40.50 −1.50 39 7 7 49 15.22% 40.00 6.00 44 46 −2 2 4 4.55% 42.50 1.50 9 45 44 1 1 1 2.22% 45.00 0.00 10 38 45 −7 7 49 18.42% 44.50 −6.50 11 40 38 2 2 4 5.00% 41.50 −1.50 30 134 72.45% MAD 3 MSE 13.4 MAPE 7.25% If lowest MAD is the criterion, the two-period moving average forecast has the greatest accuracy; if lowest MSE is the criterion, exponential smoothing works best; and if lowest MAPE is the criterion, the two-period moving average method is again best. Of course, with other data, or with different values of α for exponential smoothing, and different moving averages, the best performers could be different. DISCUSSION AND REVIEW QUESTIONS 1. What are the differences between quantitative and judgmental approaches to Page 114 forecasting? What are the advantages and disadvantages of each approach? LO1 2. Name and explain, if not obvious, one feature common to all forecasts. LO1 3. Name one element of a good forecast and, if not obvious, explain why it is important. LO1 4. What are the three forecasting horizons? For each forecasting horizon, name one LO1 operations management decision that needs the forecast. LO1 5. Briefly describe the steps of the forecasting process. 6. How can shipments to a customer differ from demand by the customer? LO1 7. Explain how flexibility in production systems relates to the forecasting horizon and accuracy. LO1 8. What are some of the consequences of poor forecasts? Explain. 9. Contrast the terms sales and demand. LO1 10. Pick one judgmental method and describe it. 11. What is a time series? LO1 LO2 LO3 12. Generally, how do time series models forecast? LO3 13. How does the naïve method forecast a seasonal time series such as sales dollars during every hour of a p ­ articular day in a fast-food restaurant? LO3 14. Describe the moving average and exponential ­smoothing techniques, and explain why they are not suitable for seasonal or trend forecasting. LO3 15. What advantages does exponential smoothing have over moving average? LO3 16. How does the number of periods in a moving average affect the responsiveness of the forecast? LO3 17. How does the size of the smoothing constant in exponential smoothing affect the responsiveness of the forecast? LO3 18. How is regression used in forecasting linear trend? 19. Explain the equation for an exponential trend. LO4 LO4 20. Explain the three formulas used in trend-adjusted ­exponential smoothing. 21. What is a seasonal relative? Give a numerical example and interpret it. LO4 LO5 22. Describe the centred moving average method and explain how it eliminates seasonality from a time series. LO5 23. Describe how seasonal relatives are determined using the centred moving average method. LO5 24. List the steps of time series decomposition for a ­seasonal time series with trend. 25. Describe how the causal (associative) regression model is used for forecasting. LO5 LO6 26. What is the correlation coefficient, and how is it used in an associative regression model? What does it mean if ­the correlation coefficient is negative? 27. What is forecasting accuracy and how is it measured? 28. Define and contrast MAD, MSE, and MAPE. LO6 LO7 LO7 29. Define control chart for forecast errors. What is the ­purpose of establishing control limits for forecast errors? LO7 30. What factors would you consider in deciding whether to use a wide or narrow range of acceptable variation in a control chart? LO7 31. What is meant by nonrandomness when discussing control of the forecasting process? LO7 32. What is the tracking signal? Contrast it with the control chart. LO7 33. Explain how a control chart and a tracking signal can be used to monitor bias. LO7 34. Contrast the reactive and proactive approaches to ­forecasting. Give an example of an organization or s­ ituation in which each type is used. LO8 35. Choose a forecasting technique appropriate for ­predicting: LO8 a. Demand for Mother’s Day greeting cards. b. Popularity of a new television series. c. Demand for vacations on the moon. d. Demand for toothpastes in a particular supermarket. 36. Discuss how inaccuracies in forecasts of a company in a supply chain could affect other members of the chain. LO9 37. List the specific weaknesses of each of these approaches to developing a forecast: LO2 a. Consumer surveys. b. Sales force composite. c. Committee of managers or executives. TAKING STOCK 1. Explain the trade-off between responsiveness and stability in a forecasting system that uses time-series data. LO3 2. Who needs to be involved in preparing forecasts? 3. How has technology had an impact on forecasting? LO1 LO8 4. Forecasts are sometimes manipulated by managers to accomplish goals such as higher budget, capacity increases, etc. Also, salespeople may underestimate the demand in order to beat it to receive a bonus, or they may overestimate it to keep their job. How can a company combat these unethical behaviours?5 LO2 CRITICAL THINKING EXERCISES 1. Omar has heard from some of his customers that they will probably cut back on order sizes in the next quarter. The company he works for has been reducing its sales force due to falling demand and he worries that he could be next if his sales begin to fall off. Believing that he may be able to convince his customers not to cut back on orders, he turns in an optimistic forecast of his next quarter sales to his manager. What are the pros and cons of doing that? LO2 2. It has been said that forecasting using time series exponential smoothing is like driving a car by looking in the rear view mirror. What are the conditions that would have to exist for driving a car that are analogous to the assumptions made when using exponential smoothing? LO3 3. When a new business is started, or a patent idea needs funding, venture capitalists or investment bankers will want to see a business plan that includes forecast information related to a profit and loss statement. What type of forecasting information do you suppose would be required? LO1 4. Explain the trade-off between cost and accuracy in a forecasting system. LO8 PROBLEMS 1. A commercial bakery has recorded sales (in dozens) for three products during the Page 115 last 15 workdays: LO3 Page 116 Page 117 Page 118 Page 119 Page 120 Page 121 Page 122 Page 123 Workday Blueberry Muffins Cinnamon Buns Cupcakes 1 30 18 45 2 34 17 26 3 32 19 27 4 34 19 23 5 35 22 22 6 30 23 48 7 34 23 29 8 36 25 20 9 29 24 14 10 31 26 18 11 35 27 47 12 31 28 26 13 37 29 27 Workday Blueberry Muffins Cinnamon Buns Cupcakes 14 34 31 24 15 33 33 22 a. Predict orders for the following day for each of the products using an appropriate naïve method. Hint: Plot each data set. b. What should the use of sales data instead of demand imply? 2. A dry cleaner uses exponential smoothing to forecast equipment usage as a percentage of capacity (i.e., u­ tilization) at its main plant. August usage was forecast to be 88 percent of capacity, whereas actual usage turned out to be 89.6 percent of capacity. A smoothing LO3 constant of 0.1 is used. a. Prepare a forecast for September. b. Assuming actual September usage of 92 percent, ­prepare a forecast for October’s usage. 3. An electrical contractor’s records during the last five weeks indicate the following numbers of job requests: LO3 Week: 1 2 3 4 5 Requests: 20 22 18 21 22 Predict the number of requests for week 6 using each of these methods: a. Naïve. b. Four-week moving average. c. Exponential smoothing with α = 0.30. Use 20 for the week 2 forecast. 4. A can-opener manufacturer has had monthly sales for a seven-month period as follows: LO3 & LO4 Month Sales (000 units) February 19 March 18 April 15 May 20 Month Sales (000 units) June 18 July 22 August 20 a. Plot the data. b. Forecast September’s sales volume using each of the following: i. A linear trend equation. (Use of Excel’s Trendline, with Display Equation on Chart option, is recommended.) ii. A four-month moving average. iii. Exponential smoothing with a smoothing constant of 0.10, assuming a March forecast of 19(000). iv. The naïve approach. v. A weighted average using 0.50 for August, 0.30 for July, and 0.20 for June. c. Which method seems least appropriate? Why? d. What does use of the term sales rather than demand presume? 5. Freight car loadings during an 18-week period at a port are: LO4 Week Number Week Number Week Number 1 220 7 350 13 460 2 245 8 360 14 475 3 280 9 400 15 500 4 275 10 380 16 510 5 300 11 420 17 525 6 310 12 450 18 541 a. Compute a linear trend line for freight car loadings. (Use of Excel’s Trendline is recommended. Make sure to select the Display Equation option.) b. Use the trend equation to predict loadings for weeks 19 and 20. c. The manager intends to install new equipment when the volume reaches 700 loadings per week. Assuming the current trend continues, the loading volume will reach that level in approximately what week? 6. Suppose it is the beginning of 2022 and you are trying to help the forecaster at a Canadian agricultural and construction equipment manufacturer, to forecast total agricultural and forestry equipment industry sales in Canada for the year. You have accessed Statistics Canada’s Table 36-10-0434-06 and found the gross domestic product (GDP) for the agriculture, forestry, fishing, and hunting industry (seasonally adjusted at 2012 constant prices). The data between 2015 and 2021 are as follows: LO3 LO4 Year Agriculture, forestry, fishing and hunting industry GDP (in million 2012$) 2015 37,488 2016 39,387 2017 40,258 2018 40,094 2019 41,722 2020 43,367 2021 40,560 a. Plot the time series data. b. Identify its patterns and suggest a forecasting ­technique. 7. a. Develop a linear trend equation for the following data on demand for white bread loaves at a bakery (use of Excel’s Trendline, with Display Equation on Chart option, is recommended), and use it to forecast demand on day 16. LO4 Day Loaves Day Loaves Day Loaves 1 200 6 232 11 281 2 214 7 248 12 275 3 211 8 250 13 280 4 228 9 253 14 288 Day Loaves Day Loaves Day Loaves 5 235 10 267 15 310 b. The variations around the linear trend line seem to have above- and below-the-line runs. Therefore, use trend-adjusted exponential smoothing with α = 0.3 and β = 0.2 to model the bread demand. Use the first four days to estimate the smoothed initial trend that you use for periods 4 and 5 (use the increase from day 1 to day 4 divided by 3). Also, use A to estimate S . Start forecasting day 5. What is the forecast for day 16? 4 4 8. The agronomist in charge of canola seed production for a major seed-producing and marketing company is ­wondering if the forecast for production of seed #1234 for 2023, made by the head office, is a little too low. The sales of seed #1234, in thousand tonnes, for the past eight years are shown below. The company r­ egularly improves its seeds, and has recently i­ntroduced a new seed. Given the life-cycle decline in the sales of #1234, the head office’s 2023 forecast sales for #1234 are 10 percent lower than 2022 sales. Fit an appropriate model to the data and forecast sales of #1234 in 2023. Do you agree with the head office’s forecast? Explain. LO3 & LO4 Year #1234 sales 2015 0.1 2016 2.1 2017 2.8 2018 3.1 2019 3.9 2020 3.7 2021 3.5 2022 3.4 2023 9. After plotting demand for four periods, an emergency room manager has concluded that a trend-adjusted exponential smoothing model is appropriate to predict future demand. The initial estimate of trend is based on the net change of 30 for the three periods from 1 to 4, for an average of +10 units. Use α = .5, β = .4, and TAF of 250 for period 5. Obtain forecasts for periods 6 through 10. LO4 Period, t At Actual 1 210 2 224 3 229 4 240 5 255 6 265 7 272 8 285 9 294 10 10. A manager of a store that sells and installs spas wants to prepare a forecast for January, February, and March of next year. Her forecasts are a combination of trend and seasonality. She uses the following equation to estimate the trend component of monthly demand: Ft = 70 + 5t, where t = 0 in June of last year. Seasonal relatives are 1.10 for January, 1.02 for February, and .95 for March. What demands should she predict? LO5 11. An analyst must decide between two different forecasting techniques for weekly sales of roller blades: a linear trend equation and the naive approach. The linear trend equation is s = 124 + 2t, and it was developed using data from periods 1 through 10. Based on data for periods 11 through 20 as shown in the table, which of these two methods has the greater accuracy if MAD and MSE are used? LO7 t Units Sold t Units Sold 11 147 16 152 12 148 17 155 13 151 18 157 14 145 19 160 15 155 20 165 12. The manager of a fashionable restaurant open Wednesday through Saturday says that the restaurant does about 35 percent of its business on Friday night, 30 percent on Saturday night, and 20 percent on Thursday night. Which seasonal relatives would describe this LO5 situation? 13. New-car sales of a dealer during the past year are shown in the following table, along with LO5 monthly seasonal relatives. Month Units Sold Seasonal Relative Month Units Sold Seasonal Relative Jan 640 0.80 Jul 765 0.90 Feb 648 0.80 Aug 805 1.15 Mar 630 0.70 Sept 840 1.20 Apr 761 0.94 Oct 828 1.20 May 735 0.89 Nov 840 1.21 Jun 850 1.00 Dec 800 1.21 a. Plot the data. Does there seem to be a trend? b. Deseasonalize the new car sales. c. Plot the deseasonalized data on the same graph as the original data. Comment on the two plots. 14. The following table shows a tool and die company’s quarterly sales for the current year. What sales would you predict for the first quarter of next year? Quarter relatives are SR1 = LO5 1.10, SR2 = .99, SR3 = .90, and SR4 = 1.01. Quarter: 1 2 3 4 Sales: 88 99 108 141.4 15. A farming cooperative’s manager wants to forecast quarterly grain shipments for each quarter of next year (year 6), based on the data shown below (quantities are in metric tonnes): LO5 Quarter Year 1 2 3 4 Quarter Year 1 2 3 4 1 200 250 210 340 2 210 252 212 360 3 215 260 220 358 4 225 272 233 372 5 232 284 240 381 a. Determine quarterly seasonal relatives (rounded to 3 decimals) using the centred moving average method. b. Deseasonalize the data (using the quarterly seasonal relatives rounded to 3 decimals). Fit an appropriate model to the deseasonalized data, extend it four quarters, and finally reseasonalize the projections. 16. A gift shop in a tourist centre is open only on weekends (Friday, Saturday, and Sunday). The owner–manager hopes to improve scheduling of part-time employees by determining seasonal relatives for each of these days. Data on recent activity at the store (sales transactions per day) are shown in the following table: LO5 Week 1 2 3 4 5 6 Friday 149 154 152 150 159 163 Saturday 250 255 260 268 273 276 Sunday 166 162 171 173 176 183 a. Develop seasonal relatives for each day using the centred moving average method. b. Deseasonalize the data, fit an appropriate model to the deseasonalized data, project three days ahead, and reseasonalize the projections to forecast the sales transactions for each day, Friday to Sunday, of next week. 17. Coal shipments from a mine for the past 18 weeks are: LO3 & LO4 Week Tonnes Shipped Week Tonnes Shipped 1 405 10 440 2 410 11 446 3 420 12 451 4 415 13 455 5 412 14 464 6 420 15 466 7 424 16 474 8 433 17 476 9 438 18 482 a. Plot the data as time series, determine the pattern, and explain why an averaging technique would not be appropriate in this case. b. Use an appropriate technique to develop a forecast for week 19. 18. a. Calculate daily seasonal relatives for the number of customers served at a restaurant, given the following data. (Hint: Use a seven-day centred moving average.) LO5 b. Deseasonalize the data, fit an appropriate model to the deseasonalized data, project it seven days ahead, and reseasonalize the projections to forecast daily demand next week. Day Number Served Day Number Served 1 80 15 84 2 75 16 77 3 78 17 83 4 95 18 96 5 130 19 135 6 136 20 140 7 40 21 37 8 82 22 87 9 77 23 82 10 80 24 98 Day Number Served Day Number Served 11 94 25 103 12 125 26 144 13 135 27 144 14 42 28 48 19. Suppose you are a member of the analytics team at an automobile parts manufacturer. It is the end of 2022 and your team has used an averaging method with adjustments to develop the forecast sales for a particular part for 2023. This forecast, along with the actual sales of the part for the past three years, is summarized in the table below. Year Sales volume 2020 10,444 2021 10,319 2022 8,477 2023 6,334 (forecast) LO5 Suppose the quarterly sales of this product over the past three years is as follows: Quarter 2020 2021 2022 Q1 2,370 2,641 2,281 Q2 2,058 2,198 1,814 Q3 2,778 2,518 2,127 Q4 3,238 2,962 2,255 Total 10,444 10,319 8,477 a. Use the 2020–2022 quarterly data above to determine the quarterly seasonal relatives. b. Use your answer to part a and 2023 forecast sales (6,334 units) to forecast quarterly sales for 2023. c. Deseasonalize the data, fit an appropriate model to the deseasonalized data, project it four quarters ahead, and reseasonalize the projections to forecast quarterly demand in 2023. Contrast your results with part b. 20. A pharmacist has been monitoring sales of a certain over-the-counter (i.e., no prescription is needed) pain reliever. Daily sales during the last 15 days were: LO4 Day: 1 2 3 4 5 6 7 8 9 Number sold: 36 38 42 44 48 49 50 49 52 Day: 10 11 12 13 14 15 Number sold: 48 52 55 54 56 57 a. If you learn that on some days the store ran out of this pain reliever, would that knowledge cause you any concern regarding the use of sales data for forecasting demand? Explain. b. Assume that there were no stockouts. Plot the data. Is the linear trend model appropriate for this item? Explain. c. Assume that the data refer to demand rather than sales. Using trend-adjusted smoothing with an initial forecast of 50 for day 8, an initial trend estimate of 2, and α = β = 0.3, develop forecasts for days 9 through 16. What is the MSE for the eight forecasts for which there are actual data? 21. Federated Cooperatives Limited (FCL) is the largest wholesaler of grocery, hardware, and agricultural supplies in Western Canada, and operates warehouses in Saskatoon, Edmonton, Calgary, and Winnipeg. In the Calgary warehouse, a particular golf club is carried in stock. The demand for this golf club during each month of the period 2003– 2005 is listed below (note that FCL uses weekly time buckets, but for simplicity we have combined these into monthly data): LO5 Month 2003 2004 2005 Jan 0 2 3 Feb 52 8 20 Mar 29 44 12 Apr 49 74 31 Month 2003 2004 2005 May 47 75 61 Jun 58 87 28 Jul 0 145 107 Aug 64 11 57 Sep 3 24 21 Oct 17 9 10 Nov 10 5 0 Dec 1 6 1 a. Determine the monthly relatives using the 12-period centred moving average method. b. Deseasonalize the data, fit an appropriate model to the deseasonalized data, project it 12 months ahead, and reseasonalize the projections to forecast monthly sales for 2006. (These forecasts will be used to plan purchases of the golf club from the manufacturer.) 22. The following data are quarterly sales of natural gas in Saskatchewan by SaskEnergy (in petajoules ≈ 1 billion cubic feet) from Q1 of 2005 to Q3 of 2009. LO5 Year Q1 Q2 Q3 Q4 2005 49 24 18 37 2006 42 20 20 43 2007 48 24 20 40 2008 51 25 19 43 2009 51 24 15 a. Compute the seasonal relative for each quarter using the centred moving average method. b. Deseasonalize the data, fit an appropriate model to the deseasonalized data, extend the model four quarters, and reseasonalize these in order to forecast the sales of natural gas by SaskEnergy from Q4 2009 to Q3 2010. 23. For planning production in the medium term, vehicle manufacturers need to forecast the demand for new motor vehicle sales. The following data are the numbers (in thousands) of Honda Ridgeline trucks manufactured by Honda during each quarter, starting from the first quarter of 2005 (when Ridgeline was introduced) until the third quarter of 2008.6 LO5 Assume that all Ridgelines produced in a quarter were sold in the same quarter. Year Q1 Q2 Q3 Q4 2005 11.5 19.2 17.4 12.7 2006 11.9 15.1 17.4 12.1 2007 10.6 19.1 13.9 11.5 2008 10.2 6.2 5.6 a. Compute the seasonal relative for each quarter using the centred moving average method. b. Deseasonalize the data, fit an appropriate model to the deseasonalized data, extend the model four quarters, and reseasonalize these in order to forecast the sales of Ridgeline trucks in the fourth quarter of 2008, and first, second, and third quarters of 2009. 24. The following equation summarizes the trend portion of quarterly sales of condominiums over a long cycle. Sales also exhibit seasonal variations. Using the information given, prepare a forecast of sales for each quarter of next year (not this year), and the first quarter of the year following that. LO5 Ft = 40 – 6.5t + 2t2 where Ft = Unit Sales t = 0at the f irst quarter of last year Quarter Relative 1 1.1 2 1.0 3 0.6 4 1.3 LO5 25. Compute seasonal relatives for this data using the annual average method: Quarter Year 1 Year 2 Year 3 Year 4 1 2 3 7 4 2 6 10 18 14 3 2 6 8 8 4 5 9 15 11 26. The manager of a seafood restaurant wants to establish a price on shrimp dinners. Experimenting with prices produced the following data: LO6 Average Number Sold per Day, y Price, x Average Number Sold per Day, y Price, x 200 $6.00 155 $8.25 190 6.50 156 8.50 188 6.75 148 8.75 180 7.00 140 9.00 170 7.25 133 9.25 162 7.50 160 8.00 a. Plot the data as a scatter plot, determine the r­ egression equation, and plot the regression line on the same graph as data. (You may use Excel’s “=slope(RangeY,RangeX)” and “=intercept(RangeY, RangeX)” to obtain the regression coefficients b and a, respectively, where RangeY is the range of Excel cells containing the y values and RangeX is the range of Excel cells containing the x values. Alternatively, use Trendline in the Layout menu.) b. Determine the correlation coefficient and interpret it. (You may use Excel’s “=CORREL (RangeY,RangeX)” to determine r.) 27. The following data were collected during a study of consumer buying patterns. LO6 Observation X Y Observation X Y 1 15 74 8 18 78 Observation X Y Observation X Y 2 25 80 9 14 70 3 40 84 10 15 72 4 32 81 11 22 85 5 51 96 12 24 88 6 47 95 13 33 90 7 30 83 a. Plot the data as a scatter plot. b. Obtain a linear regression line for the data. (You may use Excel’s “=slope(RangeY,RangeX)” and “=intercept(RangeY,RangeX, where RangeY is the range of Excel cells containing the y values and RangeX is the range of Excel cells containing the x values)” to obtain the regression coefficients b and a, respectively. Alternatively, use Trendline in the Layout menu.) c. What percentage of the variation is explained by the regression line? (You may use Excel’s “=RSQ(RangeY,RangeX)” to obtain r2.) d. Use the equation determined in part b to predict the value of y for x = 41. 28. Lovely Lawns, Inc. intends to use sales of lawn fertilizer to predict lawn mower sales. The store manager wishes to determine the relationship between fertilizer and mower sales. The pertinent data are: LO6 Fertilizer Sales Number of Fertilizer Sales Number of Period (tonnes) Mowers Sold Period (tonnes) Mowers Sold 1 1.6 10 8 1.3 7 2 1.3 8 9 1.7 10 3 1.8 11 10 1.2 6 4 2.0 12 11 1.9 11 5 2.2 12 12 1.4 8 6 1.6 9 13 1.7 10 7 1.5 8 14 1.6 9 a. Determine the correlation between the two variables. Does it appear that a relationship between these variables will yield reasonable predictions? Explain. (You may use Excel’s “=CORREL (RangeY,RangeX)” to determine r, where RangeY is the range of Excel cells containing the y values and RangeX is the range of Excel cells containing the x values. You also need R2, RSQ(RangeY,RangeX).) b. Obtain a linear regression line for the data. (You may use Excel’s “=slope(RangeY,RangeX)” and “=intercept(RangeY,RangeX)” to obtain the regression coefficients b and a, respectively. Alternatively, use Trendline in the Layout menu.) c. Predict expected lawn mower sales for the first week in August, given fertilizer sales six weeks earlier of 2 tonnes. 29. Columbia Gas Company of Ohio distributes natural gas to residential, business, and industrial customers in Ohio.7 In order to secure enough gas supply, Columbia Gas forecasts daily demand for the next five days using regression. It has identified the average daily temperature as the most important explanatory variable for daily demand for natural gas, measured in thousand dekatherm. (Note: A dekatherm is a unit of energy normally used for natural gas. One dekatherm is approximately 1.06 Gigajoules (GJ)). The regression is estimated using daily data from the past two years. For brevity, we consider only a subset of this period as follows. LO6 a. Plot the average temperature and demand data for the past 10 days. Does there appear to be a linear relationship? b. Estimate the regression coefficients. (You may use Excel’s “=slope(RangeY,RangeX)” and “=intercept(RangeY,RangeX)” to obtain the regression coefficients b and a, respectively, where RangeY is the range of Excel cells containing the y values and RangeX is the range of Excel cells containing the x values.) c. If the average temperature tomorrow is expected to be 42 degrees Fahrenheit, what is the forecast for demand for natural gas tomorrow? Day Avg. Temp (F) Demand (thousand dekatherm) −10 33 1005 −9 46 501 −8 41 612 −7 47 499 Day Avg. Temp (F) Demand (thousand dekatherm) −6 37 692 −5 36 709 −4 32 951 −3 34 1053 −2 38 746 −1 43 458 30. The manager of a large manufacturer of industrial pumps must choose between two alternative forecasting techniques to forecast the demand for its top-selling pump. Both techniques have been used to prepare forecasts for a six-month period. Using MAD as a criterion, which technique produces more accurate forecasts? LO7 Forecast Month Demand Technique 1 Technique 2 1 492 488 495 2 470 484 482 3 485 480 478 4 493 490 488 5 498 497 492 6 492 493 493 31. Two different forecasting techniques were used to forecast demand for cases of bottled water. Actual demand and the two sets of forecasts are as follows: LO7 Forecast Demand Period Demand F1 F2 1 68 66 66 2 75 68 68 3 70 72 70 4 74 71 72 5 69 72 74 Forecast Demand Period Demand F1 F2 6 72 70 76 7 80 71 78 8 78 74 80 a. Compute MAD for each set of forecasts. Given your results, which forecast appears to be more accurate? Explain. b. Compute the MSE for each set of forecasts. Given your results, which forecast appears to be more accurate? c. In practice, either MAD or MSE would be employed to compute forecast errors. What factors might lead a manager to choose one rather than the other? d. Compute MAPE for each data set. Which forecast appears to be more accurate? 32. Two independent sets of forecasts based on judgment and experience have been prepared each month for the past 10 months. The forecasts and actual demand are as follows: LO7 Month Demand Forecast 1 Forecast 2 1 770 771 769 2 789 785 787 3 794 790 792 4 780 784 798 5 768 770 774 6 772 768 770 7 760 761 759 8 775 771 775 9 786 784 788 10 790 788 788 a. Compute the MSE and MAD for each forecast. Does either forecast seem superior? Explain. b. Compute MAPE for each forecast. c. Prepare a naïve forecast for periods 2 through 11 using the given sales data. Compute each of the following: (1) MSE, (2) MAD, (3) tracking signal at month 10, and (4) 2s control limits. How do the naïve results compare with the other two forecasts? 33. The classified department of a monthly magazine has used a combination of quantitative and judgmental methods to forecast sales of advertising space. The forecast errors over an LO7 18-month period are as follows: Month Forecast Error Month Forecast Error 1 −8 10 −4 2 −2 11 1 3 4 12 6 4 7 13 8 5 9 14 4 6 5 15 1 7 0 16 −2 8 −3 17 −4 9 −4 18 −8 a. Using the first half of the data (Months 1 to 9), c ­ onstruct a control chart with 2s limits. b. Plot the last nine forecast errors on the control chart. Is the forecasting process in control? Are the forecast errors random? Explain. 34. A textbook publishing company has compiled data on total annual sales of its business textbooks for the p ­ receding eight years: LO4 & LO7 Year: 1 2 3 4 5 6 7 8 Sales (000): 40.2 44.5 48.0 52.3 55.8 57.1 62.4 69.0 a. Plot the data and fit an appropriate model to it. Forecast the preceding eight years and determine the forecast errors. Finally, construct a 2s control chart. b. Using the model, forecast textbook sales for each of the next five years. c. Suppose actual sales for the next five years turn out as follows: Year: 9 10 11 12 13 Sales (000): 73.7 77.2 82.1 87.8 90.6 Calculate the forecast errors for years 9 to 13. Is the f­orecasting process under control? Explain. 35. A manager has just received an evaluation from an analyst on two potential forecasting methods. The analyst is indifferent between the two methods, saying that they should be equally accurate and in control. The demand and the forecasts using the two methods for LO7 nine ­periods follow: Period: 1 2 3 4 5 6 7 8 9 Demand: 37 39 37 39 45 49 47 49 51 Method 1: 36 38 40 42 46 46 46 48 52 Method 2: 36 37 38 38 41 52 47 48 52 a. Calculate the MSE for each method and compare the two methods. b. Construct a 2s control chart for each method and interpret them. Do you agree with the analyst? Explain. 36. A manager uses this equation to predict demand for landscaping services: F t = 10 + 5t. Over the past eight periods, demand has been as follows: LO4 & LO7 Period, t: 1 2 3 4 5 6 7 8 Demand: 15 21 23 30 32 38 42 47 Is the forecast performing adequately? Explain. 37. Consider the usage of item #14-46-506: 4 ft. Supersaver fluorescent lamps in Sterling Pulp Chemicals (now part of ERCO Worldwide) in the first 10 months of 2008. Month 2008 Jan 10 Feb 10 Month 2008 Mar 66 Apr 32 May 34 June 18 July 24 Aug 9 Sep 14 Oct 48 Fit a model to the data using each of the following techniques and forecast the November usage in each case. Also, plot the two moving average forecasts and the actual, the two exponential smoothing forecasts and the actual, and the linear trend and the actual (three graphs altogether). LO3 & LO4 a. Three-month moving average. b. Five-month moving average. c. Exponential smoothing with smoothing constant = 0.1. d. Exponential smoothing with smoothing constant = 0.3. e. Linear trend (regression). f. Just by observing the plots, which of the above techniques would you use to forecast the usage of fluorescent lamps and why? (Hint: The plot overall closest to actual demand will be most accurate.) g. Alternatively, compute the MAD for each forecasting technique and determine the most accurate technique. 38. Consider the total production (and sales) of ice cream in Canada (in millions of litres) for the period 1995 until 2007 (from left to right):8 341, 331, 317, 315, 321, 278, 298, 311, 302, 302, 335, 320, 285 Fit a model to ice cream production data using each of the following techniques and forecast the 2008 production in each case. Also, plot the two moving average forecasts and the actual, the two exponential smoothing forecasts and the actual, and the linear trend and the actual (three graphs altogether). LO3 & LO4 a. Two-year moving average. b. Four-year moving average. c. Exponential smoothing with smoothing constant = 0.2. d. Exponential smoothing with smoothing constant = 0.4. e. Linear trend (regression). f. Just by observing the plots, which of the above techniques would you use to forecast the ice cream production and why? (Hint: The plot overall closest to actual demand will be most accurate.) g. Alternatively, compute the MAD for each forecasting technique and determine the most accurate t­ echnique. 39. The numbers of Toyota Corollas produced in the Cambridge, Ontario, plant during each month of January 2008 to December 2009 period were as follows:9 Month No. Produced Month No. Produced 2008–01 4,959 2009–01 6,733 2008–02 8,463 2009–02 1,006 2008–03 11,706 2009–03 9,328 2008–04 9,907 2009–04 9,072 2008–05 9,354 2009–05 8,738 2008–06 11,297 2009–06 12,259 2008–07 8,905 2009–07 9,519 2008–08 12,249 2009–08 12,113 2008–09 19,160 2009–09 14,044 2008–10 14,264 2009–10 16,650 2008–11 13,687 2009–11 16,912 2008–12 8,657 2009–12 13,851 Assume that the cars are sold in the same month they are produced. Identify an appropriate forecasting technique, briefly state the reason(s) you chose it, and forecast Corolla demand in January 2010. LO3 – LO5 , LO7 & LO8 40. A cosmetics manufacturer’s marketing department has developed a linear trend equation that can be used to predict annual sales of its popular hand cream. LO4 ŷ = 80 + 15t t where ŷ = Annual sales (000 bottles) and t is the index of time periods t a. Are annual sales increasing or decreasing? By how much? b. Predict annual sales for year 6 using the equation. 41. Long-Life Insurance has developed a linear model that is used to determine the amount of term life insurance a family of four should have, based on the current age of the primary income earner. The equation is: LO3 LO4 y = 850 − 0.1x where y = Insurance needed ($000) and x = Current age of primary income earner a. Plot the relationship on a graph. b. Use the equation to determine the amount of term life insurance to recommend for a family of four if the primary income earner is 30 years old. 42. a. Obtain the linear trend equation for the following data on new chequing accounts at Fair Savings Bank and use it to predict expected new chequing accounts for periods 16 LO4 through 19. Period New Accounts 1 200 2 214 3 211 4 228 5 235 6 232 7 248 8 250 9 253 10 267 Period New Accounts 11 281 12 275 13 280 14 288 15 310 b. Use trend-adjusted smoothing with α = .3 and β = .2 to smooth the new account data in part a. What is the forecast for period 16? MINI-CASE Mini-Case M&L Manufacturing M&L Manufacturing makes various components for printers and copiers. In addition to supplying these items to a major manufacturer, the company distributes these and similar items to office supply stores and computer stores as replacement parts for printers and desktop copiers. In all, the company makes about 20 different items. The two markets (the major manufacturer and the replacement market) require somewhat different handling. For example, replacement products must be packaged individually, whereas products are shipped in bulk to the major manufacturer. The company does not use forecasts for production planning. Instead, the operations manager decides which items to produce and the batch size, based on orders and the amounts in inventory. The products that have the fewest amounts in inventory get the highest priority. Demand is uneven, and the company has experienced being overstocked on some items and out of others. Being understocked has occasionally created tensions with the managers of retail outlets. Another problem is that prices of raw materials have been creeping up, although the operations manager thinks that this might be a temporary condition. Because of competitive pressures and falling profits, the manager has decided to undertake a number of changes. One change is to introduce more formal forecasting procedures in order to improve production planning and inventory management. With that in mind, the manager wants to begin forecasting for two products. These products are important for several reasons. First, they account for a disproportionately large share of the company’s profits. Second, the manager believes that one of these products will become increasingly important to future growth plans; and third, the other product has experienced periodic out-of-stock instances. The manager has compiled data on product demand for the two products from order records for the previous 14 weeks. These are shown in the following table: Week Product 1 Product 2 1 50 40 2 54 38 3 57 41 4 60 46 5 64 42 6 67 41 7 90* 41 8 76 47 9 79 42 10 82 43 11 85 42 12 87 49 13 92 43 14 96 44 *Unusual order due to flooding of customer’s warehouse. Questions 1. What are some of the potential benefits of a more formalized approach to forecasting? 2. Prepare a weekly forecast for the next four weeks for each product. Briefly explain why you chose the methods you used. (Hint: For product 2, a simple approach, possibly some sort of naïve/intuitive approach, would be preferable to a technical approach in view of the manager’s disdain of more technical methods.) Page 124 Mini-Case Highline Financial Services Highline Financial Services provides three categories of service to its clients. Managing partner Freddie Mack is getting ready to prepare financial and personnel hiring (or layoff) plans for the coming year. He is a bit perplexed by the following printout he obtained, which seems to show oscillating demand for the three categories of services over the past eight quarters: Service Year Quarter A B C 1 1 60 95 93 2 45 85 90 3 100 92 110 4 75 65 90 Examine the demand that this company has experienced for the three categories of service it offers over the preceding two years. Assuming nothing changes in terms of advertising or promotion, and competition doesn’t change, predict demand for the services the company offers for the next four quarters. Note that there are not enough data to develop seasonal relatives. Nonetheless, you should be able to make reasonably good, approximate intuitive estimates of demand. What general observations can you make regarding demand? Should Freddie have any concerns? Explain. Service Year Quarter A B C 2 1 72 85 102 2 51 75 75 3 112 85 110 4 85 50 100 Questions 1. What general observations can you make regarding demand? 2. Should Freddie have any concerns? Explain. CHAPTER 4 Product and Service Design Page 125 A photograph shows a 3-D printed Fibonacci house. Guido Kirchner/picture-alliance/dpa/AP Images LEARNING OBJECTIVES After completing this chapter, you should be able to: LO1 LO2 LO3 LO4 LO5 LO6 LO7 LO8 LO9 LO10 Describe what product and service design does and identify some reasons for design or redesign. Describe the phases in product and service design. List some sources of ideas for new or revised designs. Explain product and service design considerations. Describe and perform quality function deployment (QFD). Discuss the Kano model. Discuss FMEA analysis. List the major characteristics of service systems. Discuss global product and service design. Describe how product and service design contributes to competitive advantage. Carbon dioxide is an important environmental issue, and the production of concrete is one of the great contributors of CO2. Therefore, a Canadian construction company has introduced a revolutionary idea of building 3D houses to remedy this environmental issue. The company is called Twente Additive Manufacturing (TAM), was founded in 2018 with 20 employees, and is the developer and seller of 3D-printer equipment used to build 3D-printed houses in BC. The company experiments with developing new printing methods that affect the construction industry greatly. They built the entire house shown in the photo (the Fibonacci House) from 3D technology. The estimated cost to build the house was $150,000, and it is now ready to be rented. 3 The house was built using 20 printed parts with a 130 m3 print surface, and it only took 11 days to complete. The house includes glue-lam beams and handmade window frames.1 4.1 Introduction LO1 Describe what product and service design does and Identify some reasons for design or redesign. The essence of any business organization is the goods and services it offers, and every aspect of the organization and its supply chain is structured around those goods and services. There is an obvious link between the design of those goods and services and the success of the organization. Hence, organizations have a strategic interest in product and service design. It is significant to note that an important cause of operations failures can be traced to faulty Page 126 design. Designs that have not been well thought out or correctly implemented, or instructions for assembly or usage that are wrong or unclear, can be the cause of product and service failures, leading to lawsuits, injuries and deaths, product recalls, and damaged reputations. The quality of the product or service is mainly (perhaps as much as 80 percent) determined during the design. Hence, organizations have a vital stake in achieving good product or service design. The introduction of new products or services, or changes to product or service designs, can have impacts throughout the organization and the entire supply chain. Some processes may change very little, while others may have to change a lot in terms of what they do or how and when they do it. New processes may have to be added, and some current ones may be eliminated. New suppliers and distributors may need to be found and integrated into the system, and some current suppliers and distributors may no longer be an appropriate fit. Moreover, it is necessary to take into account the projected impact on demand, as well as the financial, marketing, and distribution implications. Because of the potential for widespread effects, taking a “big picture” systems approach early and throughout the design or redesign process is imperative to reduce the chance of missing some implications and costs, and to understand the time it will take. Likewise, input from engineering, operations, marketing, finance, accounting, and supply chains is crucial. In this chapter, you will discover insights into the design process that apply to both product and service design. Among the topics covered are sources of ideas for design or redesign; product or service design considerations and concepts; quality function deployment, a method for translating the “voice of customers” into design attributes; the Kano model; and failure modes and effects analysis. What Does Product and Service Design Do? Product or service design involves the determination of the form and function of the product or service. Business organizations select the products or services they want to offer based on their expected profit contribution. In most cases, products or services are redesigned to invigorate their demand and to take advantage of new technology. Design thinking is a systems approach to product design. See the “ OM in Action. Steelcase and Design Thinking” OM in ACTION Steelcase and Design Thinking Spaces Images/Blend Images LLC Design thinking is a systems approach to product design that starts with a thorough understanding of what people want and need in their lives and how they feel about the manner in which products are designed, produced, supported, and recycled. Design ideas are then iteratively prototyped and redesigned based on direct observation of user experiences. Design thinking has been promoted by IDEO, a major international design and consulting firm (www.ideo.com) as a key avenue for achieving and sustaining a competitive advantage. Steelcase and IDEO have been collaborating and using design thinking for more than 25 years. Their relationship has influenced furniture design across a wide range of environments—including office workspaces, student classrooms, and hospitals—and has resulted in numerous design awards for products such as the Node Chair and the Leap WorkLounge. Steelcase is now shifting its focus away from the traditional office cubicle toward furniture that is more architectural and open after noticing that the way people worked was changing from static work in offices to more fluid and technology enabled workspaces. This insight has led to two recent collaborations: Room Wizard, a meeting room booking system, and media:scape, a meeting and conferencing workspace (see photo). Steelcase believes that the modern workplace needs to provide users with choice and control over where and how they work. These workplaces need to be designed to support the physical, cognitive, and emotional well-being of workers. Page 127 Key Questions for Product and Service Design From a buyer’s standpoint, most purchasing decisions entail two fundamental considerations: One is cost, and the other is quality or performance. However, from the organization’s standpoint, most design decisions are based on the primary and secondary considerations: Primary consideration: Customer satisfaction Secondary considerations: Cost or profit, quality, ability to produce a product or provide a service, ethics/safety, and sustainability The key questions of product and service design are as follows: 1. Is there demand for it? What is the potential size of the market, and what is the expected demand profile (will demand be long term or short term, will it grow slowly or quickly)? 2. Can we do it? Do we have the necessary knowledge, skills, equipment, capacity, and supply chain capability? For products, this is known as manufacturability; for services, this is known as service ability. Also, is outsourcing some or all of the work an option? 3. What level of quality is appropriate? What do customers expect? What level of quality do competitors provide for similar items? How would it fit with our current offerings? 4. Does it make sense from an economic standpoint? What are the potential liability issues, ethical considerations, sustainability issues, costs, and profits? For nonprofits, is the cost within budget? Reasons for Product and Service Design or Redesign Product or service design typically has strategic implications for the success and prosperity of an organization. Consequently, decisions in this area are some of the most fundamental that managers must make. Product and service design or redesign should be closely tied to an organization’s strategy. Organizations become involved in product or service design or redesign for a variety of reasons. The main forces that initiate design or redesign are market opportunities and threats. The factors that give rise to market opportunities and threats can be one or more changes: Economic (e.g., low demand, excessive warranty claims, the need to reduce costs) Social and demographic (e.g., aging baby boomers, population shifts) Political, liability, or legal (e.g., government changes, safety issues, new regulations) Competitive (e.g., new or changed products or services, new advertising/promotions) Cost or availability (e.g., of raw materials, components, labour, water, energy) Technological (e.g., in product components, processes) While each of these factors may seem obvious, let’s reflect a bit on technological changes, which can create a need for product or service design changes in several different ways. An obvious way is new technology that can be used directly in a product or service (e.g., a faster, smaller microprocessor that spawns a new generation of smartphones). Technology also can indirectly affect product and service design: Advances in processing technology may require altering an existing design to make it compatible with the new processing technology. Still another way that technology can impact product design is illustrated by digital recording technology that allows television viewers to skip commercials when they view a recorded program. This means that advertisers (who support a television program) can’t get their message to viewers. To overcome this, some advertisers have adopted a strategy of making their products an integral part of a television program, say by having their products prominently displayed or mentioned by the actors as a way to call viewers’ attention to their products without the need for commercials. 4.2 Product and Service Design Process LO2 Describe the phases in product and service design. Product and service design involves or affects nearly every functional area of an organization. It is a major factor in cost, quality, time to market, customer satisfaction, and competitive advantage. Consequently, marketing, finance, operations, engineering, accounting, IT, and HR need to be involved. The team-based approach of simultaneously designing the product and the process is called concurr ent engineering. Page 128 Phases of Product Design and Development Product design and development generally proceeds in a series of phases through a teamwork. (see Figure 4-1). FIGURE 4-1 Phases in the product development process 1. Idea generation 2. Feasibility analysis 3. Product specifications 4. Process specifications 5. Prototype development 6. Design review 7. Market test 8. Product introduction 9. Follow-up evaluation 1. Idea generation. Ideas can come from customers’ feedback, research and development staff, suppliers, and competitors. 2. Feasibility analysis. Feasibility analysis entails market analysis (demand), economic analysis (development cost and production cost, profit potential), and technical analysis (capacity requirements and availability, and the skills needed). Also, it is necessary to answer the question: Does it fit with the mission? It requires collaboration among marketing, finance, accounting, engineering, and operations. 3. Product specifications. This involves detailed descriptions of what customers want (“voice of the customer”), what is needed to meet (or exceed) customer wants, a determination of the nature of the product and an assessment of its technical feasibility, and establishment of product goals and objectives (performance, price, quality, quantity, launch date, etc.). It requires collaboration between legal, engineering, design, marketing, and operations. 4. Process specifications. Once product specifications have been set, attention turns to specifications for the process that will be needed to produce the product. Determine the machines and equipment, plant layout, and work centre designs. Alternatives must be weighed in terms of cost, availability of resources, profit potential, and quality. This involves collaboration between accounting, engineering, and operations. 5. Prototype development. With product and process specifications complete, one (or a few) units are made to see if there are any problems with the product or process specifications. 6. Design review. At this stage, any necessary changes are made or the project is abandoned. Marketing, finance, engineering, design, and operations collaborate to determine whether to proceed or abandon. 7. Market test. A market test is used to determine the extent of consumer acceptance. If unsuccessful, the product returns to the design review phase. This phase is handled by marketing. 8. Product introduction. The new product is promoted. This phase is handled by marketing. 9. Follow-up evaluation. Based on user feedback, changes may be made or forecasts refined. This phase is handled by marketing. Phases in the Service Design Process Figure 4-2 lists the phases in the service design process. As you can see, they are quite similar to the phases of product design, except that the delivery system also must be designed. FIGURE 4-2 Phases in the service design process 1. Conceptualize. Idea generation Assessment of customer wants/needs (marketing) Assessment of demand potential (marketing) 2. Identify service package components needed (operations and marketing). 3. Determine performance specifications (operations and marketing). 4. Translate performance specifications into design specifications. 5. Translate design specifications into delivery specifications. Service design begins with the choice of a service strategy, which determines the nature and Page 129 focus of the service and the target market. This requires an assessment by top management of the potential market and profitability (or need, in the case of a nonprofit organization) of a particular service, and an assessment of the organization’s ability to provide the service. Once decisions on the focus of the service and the target market have been made, the customer requirements and expectations of the target market must be determined. Two key issues in service design are the degree of variation in service requirements and the degree of customer contact and customer involvement in the delivery system. These have an impact on the degree to which service can be standardized or must be customized. The lower the degree of customer contact and service requirement variability, the more standardized the service can be. Service design with no contact and little or no processing variability is very much like product design. Conversely, high variability and high customer contact generally mean the service must be highly customized. A related consideration in service design is the opportunity for selling: The greater the degree of customer contact, the greater the opportunities for selling. A useful tool for conceptualizing a service delivery system is the service blueprint, which will be discussed later in this chapter. 4.3 Sources of Ideas for New or Redesigned Products and Services LO3 List some sources of ideas for new or revised designs. Ideas for new or redesigned goods and services can come from a wide range of sources both inside and outside the organization. Sources of ideas for new or resigned products or services are: Employees (especially front-line workers who make the goods or deliver services to customers) have seen the problems in manufacturing/assembly operations or service delivery systems caused by faulty design of the parts and products. Their feedback could improve the redesigned product. Supply chain (suppliers and distributors) and their contacts within the organization, the purchasing agents, can be a rich source of ideas about the design/redesign of purchased items. Customers and their contacts within the organization, the customer service and marketing/sales employees, are aware of problems with products. Similarly, product failures and warranty claims indicate where improvements are needed. Customers may submit suggestions for improvements to existing products or for new products, or they may be queried through the use of surveys or focus groups. Marketing employees are often sources of ideas based on their studies of markets and buying patterns, and their familiarity with demographics. Also, marketing can help craft a vision of what customers are likely to want in the future. Competitors are another source of ideas to improve an organization’s products and services. Studying a competitor’s products or services and learning how the competitor operates (pricing policies, return policies, warranties, location strategies, etc.) can be advantageous. Beyond that, some companies purchase a competitor’s product and dismantle it to discover what it is composed of and how the components work, searching for ways to improve their own product. This is called reverse engineering. Automotive companies use this tactic in developing new models. They examine competitors’ vehicles, searching for best-in-class components (e.g., best hood release, best dashboard display, best door handle). Sometimes, reverse engineering can enable a company to leapfrog the competition by developing an even better product. Suppliers are still another important source of ideas, particularly due to the increased emphasis on supply chains and supplier partnerships. Research is another source of ideas for new or improved products and services. Research and develo pment (R&D) refers to organized efforts that are directed toward increasing scientific knowledge and product or process innovation. Most advances in semiconductors, medicine, communications, and space technology can be attributed to R&D efforts at colleges and universities, research foundations, government agencies, and private enterprises. R&D efforts may involve basic research, applied research, or development. Page 130 Basic research has the objective of advancing the state of knowledge about a subject without any near-term expectation of commercial applications. Applied research has the objective of achieving commercial applications. Development converts the results of applied research into useful commercial applications. Basic research, because it does not lead to near-term commercial applications, is generally underwritten by the government and large corporations. Conversely, applied research and development, because of the potential for commercial applications, appeals to a wide spectrum of business organizations. The benefits of successful R&D can be tremendous. Some research leads to patents, with the potential of licensing and royalties. However, many discoveries are not patentable, or companies don’t wish to divulge details of their ideas, so they avoid the patent route. Even so, the first organization to bring a new product or service to the market generally stands to profit from it before the others can catch up. Early products may be priced higher because a temporary monopoly exists until competitors bring out their versions. The costs of R&D can be high. Large companies in the automotive industry (such as Magna International), computer industry (such as IBM Canada), communications industry (such as BCE), aerospace industry (such as Bombardier), and pharmaceutical/biotech industry (such as Apotex) spend a lot of money on R&D. See the “ interesting application. BlackBerry’s New Product Design Project” OM in Action for an OM in ACTION BlackBerry’s New Product Design ProjectA Sean Kilpatrick/Canadian Press Images BlackBerry Limited of Waterloo, Ontario, is a Canadian wireless telecommunications company that at one time dominated the North American smartphone market. In 1999, the company leveraged its extensive experience with pager technology and designed an enterprise-oriented two-way pager with powerful email capabilities and encryption. Now BlackBerry is on the verge of becoming a leader in autonomous and connected cars. BlackBerry has invested $310 million and, with $40 million in aid from the Canadian government, is expected to expand its QNX project extensively. The plan is to work on futuristic automotive technologies such as semi-driverless and driverless cars in the next decade. In 2002, Blackberry announced that they will add Amazon Web Service (AWS) to its QNX technology, which significantly reduce time to market for their products. BlackBerry QNX will show that its Real Time Operating System (RTOS) and its artificial intelligence (AI) data platform can perform independently or in conjunction with BlackBerry QNX RTOS. The QNX Neutrino RTOS increases performance and power to industries such as automotive, robotics, medical devices, industrial controls, aerospace, and defence through reduction in development time through testing, verification and validation of their software reliability. The company will continue working on safety and security systems for regular cars that may have application in driverless cars, as well. Moreover, BlackBerry will conduct research on vehicle-to-vehicle (V2V) communication, sometimes known as car-to-car (C2C) communication. The data exchanged between cars and the environment is important information that driverless cars use to understand their surroundings. BlackBerry also focuses on the security of these communication systems to prevent hacking. R&D also contributes to a company by developing the prototypes, testing the prototypes in engineering labs, and improving the products’ reliability. Page 131 It is interesting to note that some companies are now shifting from a focus primarily on products to a more balanced approach that explores both product and process R&D. Also, there is increasing recognition that technologies often go through life cycles, in the same way that many products do. This can impact R&D efforts on two fronts. Sustained economic growth requires constant attention to competitive factors over a life cycle, and it also requires planning to be able to participate in the nextgeneration technology. The “ Searching for New Product Ideas” OM in Action illustrates some market-related sources of ideas for product design. OM in ACTION Searching for New Product Ideas What is the best way to find new product ideas? Consider the following approaches that have shown success in the past. 1. Listening to the Market Complaints Many companies have made their products successful by listening to consumer complaints about products already on the market. Complaints about the inadequacies of two-ply tissues inspired Kimberly-Clark to create three-ply Cold Care Tissues, and Gillette found it could satisfy customers with complaints about white residue from its deodorants by creating the Clear Stick. An equivalent complaint about lipstick smearing on coffee cups and shirt collars resulted in Lancôme’s transfer-resistant Rouge Idôle lipsticks. 2. Gaps in the Market 3M used focus groups to create its Pop-Up Tape Dispenser—it noticed that consumers were one hand short of being able to hold wrapping paper, scissors, and tape when wrapping gifts. The new patented creation fit like a wristwatch, precutting tape strips and otherwise giving gift-wrappers a hand up. Black & Decker introduced its cordless DeWalt power tools for professionals who needed powerful equipment (such as drills) and could get this only from corded tools. The Black & Decker Snakelite twistable flashlight allows for hands-free use during repairs in tight-fitting spaces such as bathrooms or furnace rooms. John Deere’s “Gator” is an inexpensive, six-wheel, off-road, all-terrain utility vehicle suitable for transporting everything from personnel and equipment to farming debris to wounded soldiers from the battlefield. The Gator simply doesn’t have any direct competitors. 3. Exploring Niche Markets For drivers who have been dropped by their insurance carriers because they are considered risky, Kingsway Financial Services Company of Mississauga, Ontario, provides an unparalleled service. Offering car insurance to drivers like these, Kingsway has seen its annual revenue rocket from less than $20 million to more than $92 billion in a mere 10 years. Coleman, traditionally a manufacturer of camping gear, found a lucrative niche in the market when it produced smoke detectors with large “broom button” alarm testers. Using a broom handle to shut off nuisance alarms triggered by burnt toast appealed especially to the elderly and gave Coleman a 40 percent market share as a result. 4. Using New Technology Many new products have found that they could attract the attention of the market by exploiting a new science or art, whether it is a once-a-month pill to rid cats and dogs of fleas (Novartis), or frosted windows that turn clear with the flip of a switch (3M). The founders of Research In Motion (RIM) managed to use their capability with pagers to invent the BlackBerry, a portable email communicator, in the late 1990s at the peak of the high-tech boom. 5. Creating New Market Space WestJet started by targeting a new market, the “friends and relatives” who normally drive to visit. Sony Walkman created a new market of personal portable stereos for joggers and commuters. Starbucks emphasizes the emotional value of drinking coffee by providing a chic “caffeine-induced oasis.” Body Shop did the reverse by selling natural ingredients and healthy living instead of glamour and beauty. 4.4 Product and Service Design Considerations LO4 Explain product and service design considerations. Based on the nature of a product or service, designers must take into account a wide range of considerations in their designs. In this section, you will learn about product and service design considerations. You will see that some of the considerations have greater applicability for the design of products than the design of services. These topics which are discussed in this section are: Product life cycle Page 132 Concurrent engineering Computer-aided design (CAD) Product life cycle management (PLM) Design for manufacturing and assembly (DFMA) Degree of standardization Design for mass customization Material selection Component commonality Degree of newness Design for reliability Robust design Legal and ethical issues Human factor issues Design for environment (DFM) Product Life Cycle Most, but not all, products and services go through a series of stages or phases over their useful life, sometimes referred to as their life cycle, as shown in Figure 4-3. Demand typically varies by each of the five phases: incubation, growth, maturity, saturation, and decline. Different phases call for different strategies. In every phase, forecasts of demand and cash flow are key inputs for strategy. FIGURE 4-3 Most products exhibit a life cycle over time. Incubation When a product or service is introduced, it may be treated as a curiosity item. Many potential buyers may suspect that all the bugs haven’t been worked out and that the price may drop after the introductory period. Strategically, companies must carefully weigh the trade-offs in getting all the bugs out versus getting a leap on the competition, as well as getting to market at an advantageous time. For example, introducing new high-tech products or features during peak back-to-school buying periods or holiday buying periods can be highly desirable. It is important to have a reasonable forecast of initial demand so an adequate supply of product or an adequate service capacity is in place. Growth Over time, design improvements and increasing demand yield higher reliability and lower costs, leading to growth in demand. In the growth phase, it is important to obtain accurate projections of the demand growth rate and how long that will persist, and then to ensure that capacity increases coincide with increasing demand. Producing different versions of the product is considered in this phase. Page 133 Maturity In the next phase, the product or service reaches maturity, and demand levels off. Few, if any, design changes are needed. Generally, costs are low and productivity is high. New uses for products or services can extend their life and increase the market size. Examples include baking soda, duct tape, and vinegar. Saturation In this phase, most consumers of the product only demand its replacement, and competitors supply the superior product with the lower price. Consequently, the sales volume of the product starts to decline. If companies don’t attempt to prolong the useful life of a product by improving its quality, reducing production costs (and hence the price), redesigning it, or introducing a new substitute product, saturation leads to a decline in demand. Decline In the decline phase, decisions must be made on whether to discontinue a product or service and replace it with new ones or abandon the market, or to attempt to find new uses or new users for the existing product or service. The advantages of keeping existing products or services can be tremendous. The same workers can produce the product or provide the service using much of the same equipment, the same supply chain, and perhaps the same distribution channels. Consequently, costs tend to be very low, and additional resource needs and training needs are low. Some products do not exhibit life cycles: wooden pencils; paper clips; nails; knives, forks, and spoons; drinking glasses; and similar items. However, most new products do. Services, have experience life cycles, too. For example, in banking, using tellers is in the saturation stage, using ABMs is in its maturity, and Internet banking is in its growth stage. Wide variations exist in the amount of time a particular product takes to pass through a given phase of its life cycle: some pass through various stages in a relatively short period; others take considerably longer. Often it is a matter of the basic need for the item and the rate of technological change. Some toys, video games, and style items have a life cycle of less than one year, whereas other items, such as clothes washers and dryers, may last for decades before yielding to technological change. Concurrent Engineering To achieve a smoother transition from product design to production, and to decrease product development time, many companies are using simultaneous development, or concurrent engineering. In its narrowest sense, concurrent engineering means bringing design and manufacturing engineers together early in the design phase to simultaneously develop the product and the processes for creating the product. More recently, this concept has been enlarged to participative design/engineering, which includes manufacturing, marketing, and purchasing personnel in a cross-functional team. In addition, the views of suppliers and customers are frequently sought. The purpose is to achieve product designs that reflect customer wants as well as manufacturing capabilities. Traditionally, designers developed a new product without any input from manufacturing, and then turned the design over to manufacturing, which would then have to develop a process for making the new product. This “throw-it-over-the-wall” approach created tremendous challenges for manufacturing, generating numerous conflicts and greatly increasing the time needed to successfully launch a new product. It also contributed to an “us versus them” mentality. For these and similar reasons, the simultaneous development approach has great appeal. Among the key advantages of this approach are the following: 1. Manufacturing engineers and personnel are able to identify production capabilities and capacities. Very often, there is some latitude in design in terms of selecting suitable materials and processes. Knowledge of production capabilities can help in this selection. In addition, cost and quality considerations can be greatly influenced by design, and conflicts during production can be greatly reduced. 2. There are early opportunities for design or procurement of critical machines or components, some of which might have long lead times. This can result in a major shortening of the product development process, which could be a key competitive advantage. 3. The technical feasibility of a particular design or a portion of a design can be assessed early on. Again, this can avoid serious problems during production. 4. The emphasis can be on problem resolution instead of conflict resolution. However, despite the advantages of concurrent engineering, a number of potential difficulties exist in this co-development approach. Two key ones are the following: Page 134 Long-standing boundaries between design and manufacturing can be difficult to overcome. Simply bringing a group of people together and thinking that they will be able to work together effectively is probably naïve. There must be extra communication and flexibility if the process is to work, and these can be difficult to achieve. Hence, managers should plan to devote special attention if this approach is to work. Computer-Aided Design (CAD) Computers are increasingly used for product and service design. Computer-aided design (CAD) uses computer to create, modify, analyze, or optimize a product or a service design. The designer can modify an existing design or create a new one on a display unit by means of a light pen, a keyboard, a joystick, or a mouse. Once the design is entered into the computer, the designer can manoeuvre it on the screen as if it were a three-dimensional object: It can be rotated to provide the designer with different perspectives, it can be split apart to give the designer a view of the inside, and a portion of it can be enlarged for closer examination. The designer can obtain a printed version of the completed design and file it electronically, making it accessible to people in the firm who need this information (e.g., marketing, operations). Engineers work with CAD design imagery in racing car factory. Image Source/Alamy Stock Photo A growing number of products are being designed in this way, including transformers, automobile parts, aircraft parts, integrated circuits, and electric motors. Moreover, advanced 3D imaging and medical CAD software are being used in hospitals and health units to improve the accuracy of treatment planning and the precision of surgical operations. A major benefit of CAD is the increased productivity of designers. No longer is it necessary to laboriously prepare manual drawings of products or parts and revise them repeatedly to correct errors or incorporate revisions. A second major benefit of CAD is the creation of a database for manufacturing that can supply needed information on product geometry and dimensions, tolerances, material specifications, and so on. It should be noted, however, that CAD needs this database to function and that this entails a considerable amount of effort. The third major benefit of CAD is providing the required instructions for a 3D printer to build prototypes. Some CAD systems allow the designer to perform engineering and cost analyses on proposed designs. For instance, the computer can determine the weight and volume of a part and do stress analysis as well. When there are a number of alternative designs, the computer can quickly go through the possibilities and identify the best one, given the designer’s criteria. CAD that includes finite element analysis (FEA) capability can greatly shorten the time to market of new products. It enables developers to perform simulations that aid in the design, analysis, and commercialization of new products. Designers in industries such as aeronautics, biomechanics, and automotive use FEA. See the “ and 3D Printing Push Medical Boundaries” OM in Action for an interesting application. CAD Page 135 OM in ACTION CAD and 3D Printing Push Medical Boundaries Amir Levy/Getty Images Imagine printing off a fully functional human kidney or heart with a simple click of a mouse. This may sound like something out of a science fiction novel, but medical researchers have already taken the initial steps toward producing transplantable organs using 3D printers. As a matter of fact, researchers have already produced prosthetic limbs and even a human ear. Ultimately, the goal is to create human organs for a particular patient using their own cells. It is hoped that this will solve a serious rejection problem where the body produces an immune response to attack the newly transplanted organ. Successful implementation of this technology could extend human life by numerous years—if not decades. A 3D printer works in the same way that a standard inkjet printer does, with a cartridge that deposits successive layers of material in different shapes. Each printed layer is only half the width of a human hair and corresponds to a cross-section read from a CAD model. Product Life Cycle Management (PLM) Product life cycle management (PLM) is a systematic approach to managing the series of changes a product or service goes through, from its conception, design, and development, to its end of life. PLM incorporates everything related to a particular product or service. That includes data pertaining to production processes, business processes, people, and anything else related to the product. PLM enables applications of concurrent engineering by providing a flow of real-time information and data between manufacturing and engineering for product development. Thus, teams can work concurrently to ensure that design changes are implemented in the production process efficiently and effectively. This helps to improve quality and reduce time to market. PLM software can be used to automate the management of product-related data and integrate the data with other business processes, such as enterprise resource planning (discussed in Chapter 13). A goal of PLM is to eliminate waste and improve efficiency. For example, PLM is considered to be an integral part of lean production (discussed in Chapter 14). There are three phases of PLM application: Beginning of life, which involves design and development; Middle of life, which involves working with suppliers, managing product information and warranties; and End of life, which involves strategies for product discontinuance, disposal, or recycling. Although PLM is generally associated with manufacturing, the same management structure can be applied to software development and services. Design for Manufacturing and Assembly (DFMA) Designers need to clearly understand the capabilities of the production function (e.g., equipment, skills, types of materials, technologies, and special abilities). This helps in choosing designs that match capabilities. When opportunities and capabilities do not match, management must consider the potential for expanding or changing capabilities to take advantage of those opportunities. Manufacturability is a key concern for manufactured goods: Ease of fabrication and/or assembly is important for cost, productivity, and quality. With services, ease of providing the service, cost, productivity, and quality are of great concern. Page 136 The term design for manufacturing and assembly (DFMA) is a combination of two methods: 1. Design for manufacturing (DFM) is used to design a product to make it easy to manufacture in order to decrease the time and costs of manufacturing, and increase flexibility and productivity. It also includes product simplification (simplifying the design of parts and reducing or removing the parts that are costly or difficult to manufacture). 2. Design for assembly (DFA) is used to design a product for ease of assembly of its parts. This methodology focuses on reducing the number of the product’s parts in an assembly, and simplifying the assembly sequence and methods in order to reduce the costs and time of assembly. An example of design for manufacturing and assembly is an auto company’s way of designing a car. Nowadays, auto manufacturers use the same chassis (platform) and internal components, such as engines and transmissions, on several models. In addition to the savings in design time, companies reap benefits through standard training for assembly and installation, increased opportunities for savings by ordering in bulk from suppliers (which reduces the inventory dealers and auto parts stores must carry), and minimizing the training needed by technicians. Another example is computer software, which often comprises a number of modules that are commonly used for similar applications, thereby saving the time and cost to write the code for major portions of the software. Tool manufacturers use a design that allows tool users to attach different power tools to a common power source, as another example. Value analysis and value engineering (VE) are systematic and multi-skilled team approaches that can be used in DFMA. Value analysis (VA) is an examination of the function of parts and materials in an effort to reduce the cost and/or improve the performance of an existing product. This method is used during the production of an existing product. Value engineering (VE) is an examination of the function of parts and materials in an effort to reduce the cost and/or improve the performance of a new product before investing in machinery, equipment, or production line. This method is used during the process of designing, developing, and prototyping a new product. Typical questions that would be asked are as follows: Could a cheaper part or material be used? Are there alternative sources for the item? Is the function necessary? Can the function of two or more parts or components be performed by a single part for a lower cost? Can a part be simplified? Can the item be provided internally? Could product specifications be relaxed, and would this result in a lower price? Could standard parts be substituted for nonstandard parts? Can more/less processing be done on the item to save cost or time? Can packaging be improved or made less costly? Can two or more parts be combined? Degree of Standardization An important issue that often arises in both product/service design and process design is the degree of standardization. Standardization refers to the extent to which there is absence of variety in a part or product; that is, there are limited types, sizes, and colours. Standardized products are made in large quantities of identical items; paper, gasoline, and 2 percent milk are examples. Standardized service implies that every customer or item processed receives essentially the same service. An automatic car wash is a good example; each car, regardless of how clean or dirty it is, receives the same service. Standardization carries a number of important benefits, as well as certain disadvantages. Standardized products are immediately available to customers. Standardized products mean interchangeable parts, which greatly lower the cost of production while increasing productivity and making replacement or repair relatively easy compared with that of customized parts. Design costs are generally lower. For example, automobile producers standardize key components of automobiles across product lines; components such as brakes, electrical systems, and other “under-the-skin” parts would be the same for all car models. By reducing variety, companies save time and money while increasing the quality and reliability of their products. Page 137 Another benefit of standardization is reduced time and cost to train employees. Similarly, inventory, purchasing, and accounting activities become much more routine. WestJet’s using only Boeing 737 airplanes is an example, where costs of training the pilots and maintenance workers, and inventory of spare parts, are reduced. Lack of standardization can at times lead to serious difficulties and competitive struggles, particularly when systems are incompatible. For example, lack of standardization in computer software and operating systems (Apple versus IBM) has presented users with hard choices because of the difficulty in switching from one system to the other. Standardization also has disadvantages. A major one relates to the reduction in variety. This can limit the range of customers to whom a product or service appeals. And that creates a risk that a competitor will introduce a better product or greater variety and realize a competitive advantage. Another disadvantage is that a manufacturer may freeze (standardize) a design prematurely and, once the design is frozen, find compelling reasons to resist modification. Obviously, designers must consider important issues related to standardization when making choices. The major advantages and disadvantages of standardization are summarized in Table 4-1. TABLE 4-1 Advantages and disadvantages of standardization Advantages Disadvantages 1. Fewer parts to deal with in inventory and in manufacturing. 1. Designs may be frozen with too many imperfections remaining. 2. Reduced training costs and time. 3. More routine purchasing, handling, and inspection procedures. 2. High cost of design changes increases resistance to improvements. 4. Orders fillable from inventory. 5. Opportunities for long production runs and automation. 3. Decreased variety results in less 6. Need for fewer parts justifies increased expenditures on consumer appeal. perfecting designs and improving quality control procedures. Design for Mass Customization Companies like standardization because it enables them to produce high volumes of relatively low-cost products, albeit products with little variety. Customers, on the other hand, typically prefer more variety, although they like the low cost. The question for producers is how to resolve these issues without (1) losing the benefits of standardization and (2) incurring the problems that are often linked to variety. The answer, at least for some companies, is mass customization, a strategy of producing standardized goods or services but incorporating some degree of customization in the final product. (See the “ Fast-Food Chains Adopt Mass Customization” OM in Action.) Several tactics make this possible. One is delayed differentiation, and another is modular design. OM in ACTION Fast-Food Chains Adopt Mass CustomizationB Pulled pork sandwiches are proving popular at many chain restaurants, including Wendy’s, Buffalo Wild Wings, and Burger King. Because pulled pork typically takes about four hours to cook, it’s not a food most folks are likely to cook at home. And once the meat is cooked, sandwiches can easily be assembled to order (i.e., delayed differentiation) using any of a large number of sauces or seasonings. Customer appeal is obvious. And advantages for fast-food restaurants include simplified menus, minimal training requirements, and little need for new equipment. Delayed differentiation is a postponement tactic: the process of producing but not quite Page 138 completing a product until customer preferences or specifications are known. In the case of goods, almost-finished units might be held in inventory until customer orders are received, at which time customized features are incorporated according to customer requests. For example, furniture makers can produce dining room sets but not apply stain, allowing customers a choice of stains. Once the choice is made, the stain can be applied in a relatively short time. Another example is HP printers, made in Singapore for the European market. By postponing country-specific customization (e.g., labels, packaging, and manuals), and doing this in its distribution centre in Stuttgart, HP saved 25 percent in total manufacturing, shipping, and inventory costs. Finally, manufacturers of men’s clothing produce dress pants with unfinished cuffs, allowing the customers to choose the exact length. Modular design is the grouping of parts into modules that are easily interchanged or replaced. The product is composed of a number of modules or components instead of a collection of individual parts. One familiar example of modular design is computers with modular components that can be replaced if they become defective. By arranging modules in different configurations, different computer capabilities can be obtained. This is the major reason that Dell can assemble and have custom-ordered computers delivered to its Internet customers in a matter of days. For mass customization, modular design enables producers to quickly assemble modules to achieve a customized configuration for an individual customer, avoiding the long customer wait that would occur if individual parts had to be assembled. Pop Up Next is a fully electric modular system developed by Audi Airbus and Italdesign that is a combination of ground and air vehicle. Antonello Marangi/Shutterstock Another advantage of modular design is that failures are often easier to diagnose and remedy because modules can be tested individually. Other advantages include simpler purchasing, inventory control, and assembly operations. The main disadvantage of modular design is the inability to disassemble some modules in order to replace a faulty part; the entire module must be scrapped—usually at a higher cost. Modular design also is found in the construction industry. The construction company makes prefabricated motel rooms complete with wiring, plumbing, and even room decorations in its factory and then moves the complete rooms by rail to the construction site, where they are integrated into the structure. For an example of modular design, see the “ Constructing Modular Hotels in Canada” OM in Action. OM in ACTION Constructing Modular Hotels in Canada Jochen Tack/Alamy Stock Photo Modular construction is gaining interest in Canada. This is a construction method in which the building (including walls, floors, ceilings, windows, fixtures, fittings, and furnishings) is assembled indoors in a protected environment and then transported to the site for assembly. Jim Dunn, president and founder of Calgary-based Stack Modular, says that chains such as Marriott, Hilton, Hyatt, Travelodge, and Comfort Inn are using the modular method to build their hotels. Days Inn Sioux Lookout (located 350 km northwest of Thunder Bay, Ontario) took only 13 months to build instead of the 30 months that would have been needed to build it traditionally. The modular method uses the same materials and codes to build an efficient unit with the time and cost saving. Efficiency is not the only advantage of this form of construction. Modular construction also provides built-in soundproofing through using two walls separated by air space, instead of the single wall used in traditional construction. Environmental waste is reduced, since the units are built inside. Modular units can be added to the existing building as an extension, or even removed for upgrading. Finally, standardization means the sizes of the rooms are exactly the same everywhere. Page 139 Material Selection Careful consideration for material selection is always important for achieving the performance and cost objectives of any product. For example, plastic may be used for the dashboard of a car due to its economical nature, but it lacks strength and should never be used on the car body. Similarly, if a product is used primarily outdoors, the damaging effects of ultraviolet light should be factored in. If material selection is not done properly, the performance and life expectancy of a product may be highly unpredictable. One must first define the product requirements in terms of mechanical, thermal, environmental, electrical, and chemical properties. Once this is complete, the choice of material can be narrowed down by the method of elimination. Production techniques also have a major impact on material selection. Material property data sheets may be used to guide the process of material selection; however, actual performance must be assessed based on experimentation. Depending on the specific application, different materials may need to be assessed for tensile, bend, impact, and compressive strengths; fatigue; endurance; deformation; and stress-relaxation properties. A design may look good on paper but fail to work properly in real-world situations. For instance, a product may be subjected to a higher than expected load. Consequently, the materials engineer must have the ability to predict this ahead of time and design the product to withstand these types of demands. It is generally a good idea to produce several alternative designs and expose each to various environmental conditions in order to find the most appropriate material.2 Takata Corporation, one of Japan’s largest airbag suppliers, was fined over $1 billion and ordered to recall over 50 million vehicles because of defective airbags that can explode with significantly more force than needed. The company made the mistake of using as an ignitor in its airbags the chemical ammonium nitrate, a substance that can be easily damaged by extreme temperature fluctuations and high humidity (such as the climate in Florida, where most of the defects occurred). None of the other big airbag suppliers Jack Sullivan/Alamy Stock Photo Component Commonality Companies often have multiple products or services to offer customers. Often, these products or services have a high degree of similarity of features and components. This is particularly true of product families, but it is also true of many services. Companies can realize significant benefits when a part can be used in multiple products. For example, car manufacturers employ this tactic by using internal components such as water pumps, engines, and transmissions on several automobile nameplates. In addition to the savings in design time, companies reap benefits through standard training for assembly and installation, increased opportunities for savings by buying in bulk from suppliers, and commonality of parts for repair, which reduces the inventory that dealers and auto parts stores must carry. Similar benefits accrue in services. For example, in automobile repair, component commonality means less training is needed because the variety of jobs is reduced. The same applies to appliance repair, where commonality and substitutability of parts are typical. Multiple-use forms in financial and medical services are other examples. Computer software often comprises a number of modules that are commonly used for similar applications, thereby saving the time and cost to write the code for major portions of the software. Tool manufacturers use a design that allows tool users to attach different power tools to a common power source. Similarly, HP has a universal power source that can be used with a variety of computer hardware. Page 140 Degree of Newness Product or service design change can range from the modification of an existing product or service to an entirely new product or service: 1. Modification of an existing product or service 2. Expansion of an existing product line or service offering 3. Clone of a competitor’s product or service 4. New product or service The degree of change affects the newness to the organization and the newness to the market. For the organization, a low level of newness can mean a fairly quick and easy transition to producing the new product, while a high level of newness would likely mean a slower and more difficult, and therefore more costly, transition. For the market, a low level of newness would mean little difficulty with market acceptance, but possibly low profit potential. Even in instances of low profit potential, organizations might use this strategy to maintain market share. A high level of newness, on the other hand, might mean more difficulty with acceptance, or it might mean a rapid gain in market share with a high potential for profits. Unfortunately, there is no way around these issues. It is important to carefully assess the risks and potential benefits of any design change, taking into account clearly identified customer wants. Design for Reliability Reliability is a measure of the ability of a product, a part, or an entire system to perform its intended function under normal operating conditions. The normal operating conditions include load, temperature, and humidity ranges as well as operating procedures and maintenance schedules. Failure of users to heed these conditions often results in premature failure of parts or complete systems. For example, using a passenger car to tow heavy loads will cause excess wear and tear on the drive train; driving over potholes or curbs often results in untimely tire failure; and using a calculator to drive nails might have a marked impact on its usefulness for performing mathematical operations. The term failure is used to describe a situation in which an item does not perform as intended. This includes not only instances in which the item does not function at all, but also instances in which the item’s performance is substandard or it functions in a way not intended. For example, a smoke alarm might fail to respond to the presence of smoke (not operate at all), it might sound an alarm that is too faint to provide an adequate warning (substandard performance), or it might sound an alarm even though no smoke is present (unintended response). In effect, reliability is a probability. Suppose that an item has a reliability of 0.90. This means there is 90 percent probability that the item will perform functioning as intended. Consequently, its failure rate is , or the probability that it will fail is 10 percent. 1 − 0.90 = 0.10 Reliability or the probability that a part or product will operate as planned is an important concept in product design. What follows are examples illustrating the use of two probability rules to determine whether a given product will operate successfully. Let P = Probability that event i occurs, i i = 1, 2, 3, … . Rule 1: Calculating Reliability in a Series Design If two or more components are in a series design and “success” is defined as the occurrence of all of the components, then the probability of success (Reliability) of the system Ps is equal to reliabilities of its components occurring: Hence, the system reliability is : Page 141 Ps = P1 × P2 × … Pn Example Suppose a flashlight has been designed to operate with two batteries connected in series. Both batteries must work (success) to turn the flashlight on. The probability of the first battery working is 0.90, and the probability of the second one working is 0.80. The probability that the flashlight working is 0.90 × 0.80 = 0.72. The two batteries are connected in a series design in a flashlight can be presented as follow: Even though the individual components of a series system (product) might have high reliability, the reliability of series system (product) can have considerably less reliability because the system is dependent on each of its components (i.e. the reliability of system is 0.72 which is less than reliability of each component 0.90 and 0.80). As the number of components in a series system (product) increases, the system (product) reliability decreases. For example, a series system (product) that has eight components, each with a reliability of 0.99, has a reliability of only (0.99) 8 .See = 0.923 Figure 4-4 for plots of product reliability as a function of number of its components for selected component reliability, CR. FIGURE 4-4 Relating product and component reliabilities Many products have a large number of component parts that must all operate, and some way to increase overall reliability is needed. One approach is to overdesign, that is, to enhance the design to avoid a particular type of failure. For example, use a more durable and higher quality (but more expensive) material in a product. Another is to simplify the design, that is, to reduce the number of components in the product. The third approach is to use redundancy in the design. This involves providing backup components. Rule 2: Calculating Reliability in a Parallel Design If two or more components/events are independent and “success” is defined as occurrence of at least one of the events, then the probability of success or reliability of the system Ps is equal to 1 minus the probability that none of the events will occur: Page 142 P s = 1 − (1 − P 1 ) (1 − P 2 )(1 − P 3 ) … (1 − P n )or P s = P 1 + (1 − P 1 )P 2 + (1 − P 1 ) (1 − P 2 )P 3 + … . Example There are two parallel lamps in an elevator. When switched on, only the first lamp turns on, and the second one is a backup. If the first lamp fails to turn on, the backup lamp will turn on. The reliability of the first lamp is 0.90, and the second lamp is 0.80. Then, the reliability or probability of success is: P s = 1 − (1 − 0.90) (1 − 0.80) = 0.98. Conceptually, the probability of success Ps is probability that the first lamp operates plus probability that the first lamp fails and the backup lamp operates: 0.90 + (1 − 0.90) × 0.80 = 0.98. This backup system can be represented by the following diagram. Example Three lamps have probabilities of 0.90, 0.80, and 0.70 of lighting when switched on. Only one lighted lamp is needed for success and the two others are backups. Then, probability of success P s = 1 − (1 − 0.90) (1 − 0.80) (1 − 0.70) = 0.994. Conceptually, we can think of this system as a lamp with a backup which in turn has a backup. If the first lamp fails to light when turned on, the second lamp is turned on. If the second lamp also fails to light when turned on, the third lamp is turned on. The probability of success Ps is probability that the first lamp operates plus probability that the first lamp fails and the second lamp operates plus probability that the first and second lamps fail and the third lamp operates: [#1operates] + [#1f ails and#2operates] + [#1f ails and#2f ails and#3operates] 0. 90 + (1 − 0. 90) × 0. 80 + [(1 − 0. 90) × (1 − 0. 80) × 0. 70] This double backup system can be represented by the following diagram: = 0. 994 Page 143 In general, a product (system) may be composed of some parallel components and some series components. The product’s reliability is calculated in two stages: (1) first calculate the reliability of the parallel component(s), and then (2) use these to calculate the reliability of the resulting series system. Example 4-1 Determine the reliability of the system shown below. SOLUTION (a) The system can be reduced to a series of three components: (b) The system reliability is the product of these component reliabilities: 0.98 × 0.99 × 0.996 = 0.966 Improving Reliability A fundamental question concerning improving reliability is, how much reliability is needed? Obviously, the reliability needed for a household light bulb isn’t in the same category as the reliability needed for an airplane. So the answer to the question depends on the potential benefits of improvements and on the cost of those improvements. Generally speaking, reliability improvements become increasingly costly. Thus, although benefits initially may increase at a much faster rate than costs, the opposite eventually becomes true. The optimal level of reliability is the point where the incremental benefit received equals the incremental cost of obtaining it. In the short term, this trade-off is made in the context of relatively fixed parameters (e.g., costs). However, in the longer term, efforts to improve reliability and reduce costs can lead to higher optimal levels of reliability. Reliability can be improved in a number of ways, some of which are listed in Figure 4-5. FIGURE 4-5 Potential ways to improve reliability 1. Improve component design. 2. Improve production and/or assembly techniques. 3. Improve testing. 4. Use backups. 5. Improve preventive maintenance procedures. 6. Improve user education. 7. Improve system design. Because overall system reliability is a function of the reliability of individual components, Page 144 improvements in their reliability can increase system reliability. Unfortunately, inadequate production or assembly procedures can negate even the best of designs, and this is often a source of failures. System reliability can be increased by the use of backup components. Failures in actual use often can be reduced by upgrading user education and refining maintenance recommendations or procedures. Finally, it may be possible to increase the overall reliability of the system by simplifying the system (thereby reducing the number of components that could cause the system to fail) or altering component relationships (e.g., increasing the reliability of interfaces). New products are tested to find their breaking point. If this is low, the reliability of the product must be improved. For example, laptop and notebook computers need to be tough enough to absorb unintentional drops, and trucks, cars, and motorcycles need to endure bumps in the roads for many years. Robust Design Some products will function as designed only within a narrow range of conditions, while others will perform over a much broader range of conditions and are said to have robust design. Consider a pair of fine leather boots—obviously not made for trekking through mud or snow. Now consider a pair of heavy rubber boots—just the thing for mud or snow, as well as other conditions. The rubber boots have a design that is more robust than the fine leather boots. The more robust a product is, the less likely it is to fail due to a change in the environment in which it is used. Hence, the more designers can build robustness into the product, the better it should hold up, resulting in a higher level of customer satisfaction. Taguchi’s Approach Japanese engineer Genichi Taguchi’s approach is based on robust design. His premise is that it is often easier to design a product that is insensitive to environmental factors, either in manufacturing or in use, than to control the environmental factors. The central feature of Taguchi’s approach—and the feature used most often by North American companies—is parameter design. This involves determining the specification settings for the product that will result in robust design in terms of manufacturing variations, product deterioration, and conditions during use. The Taguchi approach modifies the conventional statistical methods of experimental design. Consider this example. Suppose a company intends to use 11 chemicals in a new product. There are two suppliers for these chemicals, and the chemical concentrations vary slightly between the two suppliers. Classical design of experiments would require 211 = 2,048 test runs to determine which combination of chemicals would be optimum. Taguchi’s approach would involve testing only 12 combinations. Legal and Ethical Issues Designers must be careful to take into account a wide array of legal and ethical considerations. Organizations have been faced with many government (federal, provincial, municipal) acts and regulations, administered by government agencies and boards designed to regulate their activities. Among the more familiar ones are the Food and Drugs Act (Health Canada), the Canadian Environmental Protection Act (Environment Canada), the Motor Vehicle Safety Act (Transport Canada), and the Hazardous Products Act (Industry Canada). Bans or regulations on materials such as saccharin, CFC, phosphate, and asbestos have sent designers scurrying back to their drawing boards to find alternative designs acceptable to both government regulators and customers. Similarly, automobile pollution standards and safety features—such as seat belts, air bags, safety glass, and energy-absorbing bumpers and frames—have had a substantial impact on automotive design. Much attention also has been directed toward toy design to remove sharp edges, small pieces that can cause choking, and toxic materials. In construction, government (municipal) regulations require access to public buildings for persons with disabilities, and standards for insulation, electrical wiring, plumbing, and fire protection. Designers should not infringe on patents, trademarks, and copyright of competitors. If the Page 145 product is not significantly different from a patented/copyrighted product in functional and operational characteristics or appearance (if this results in undeserved benefit), the company can be sued.3 Product liability can be a strong incentive for design improvements. Product liability means that a manufacturer is liable for any injuries or damages caused by a faulty product because of poor workmanship or design. Many business firms have faced lawsuits related to their products, including Ford Motor Company, General Motors, tobacco companies, and toy manufacturers. The suits and potential suits have led to increased legal and insurance costs, expensive settlements with injured parties, and costly recalls. Moreover, increasing customer awareness of product safety can adversely affect product image and subsequent demand for a product. Thus, it is extremely important to design products that are reasonably free of hazards. When hazards do exist, it is necessary to install safety guards or other devices for reducing accident potential, and to provide adequate warning notices of risks. Consumer groups, business firms, and various government agencies often work together to develop industry-wide standards that help avoid some of the hazards. Ethical issues often arise in the design of products. Designers are often under pressure to speed up the design process and to cut costs. These pressures often require them to make trade-off decisions, many of which involve ethical considerations. One example of what can happen is “vaporware,” when a software company doesn’t issue a release of software as scheduled because it is struggling with production problems or bugs in the software. The company faces the dilemma of releasing the software right away or waiting until most of the bugs have been removed—knowing that the longer it waits, the more time will be needed before it receives revenues and the greater the risk of damage to its reputation. Organizations generally want designers to adhere to guidelines such as the following: Produce designs that are consistent with the goals of the organization. For instance, if the company has a goal of high quality, don’t cut corners to save on costs, even in areas where it won’t be apparent to the customer. Give customers the value they expect. Make health and safety a primary concern. At risk are employees who will produce goods or deliver services, workers who will transport the products, customers who will use the products or receive the services, and the general public, which might be endangered by the products or services. Between 2000 and 2015, Volkswagen sold more than 100,000 vehicles with the 2.0-litre TDI engine which featured emissions-cheating software. The software would automatically change performance parameters when the car was under formal emissions testing in order to reduce emissions. Under normal driving conditions, another set of parameters would be used and emissions were more than 10 times the advertised limit. damiangretka/Shutterstock Human Factor Issues Human factor issues often arise in the design of consumer products. Safety and liability are two critical issues in many instances, and they must be carefully considered. For example, the crashworthiness of vehicles is of much interest to consumers, insurance companies, automobile producers, and the government. Another issue for designers to take into account is adding new features to their products or services. Companies in certain businesses may seek a competitive edge by adding new features. Although this can have obvious benefits, it can sometimes be “too much of a good thing,” and be a source of customer dissatisfaction. This “creeping featurism” is particularly evident in electronic products such as handheld devices that continue to offer new features, and more complexity, even while they are shrinking in size. This may result in low consumer ratings in terms of “ease of use.” For an example of human factors consideration, see the Action. “Air Taxi Services in Canada” OM in Page 146 OM in ACTION Air Taxi Services in CanadaC Chesky/Shutterstock Vertiko Mobility is a Québec-based company founded in 2021 has decided to base its operation in Montreal and Quebec city for its first vertiport network. Initially, they will use 70 all-electric and two hybrid-electric models of Texas based Jaunt Air Mobility eVTOLs. The company’s plan is to construct vertiports for urban air mobility operations starting in 2026 using the Jaunt Journey eVTOL aircraft. Their activities entail cargo, military, medical and passenger services. Vertiko has already mapped out potential routes on its vertiport network air mobility operation and divide Quebec metropolitan areas into micro-districts linked by routes from a minimum of five-minute flight (seven kilometers) and the maximum of 15-minute flight (38 km). There are many regulations that must be considered before the final approval is given to transport passengers, and Transport Canada stated that it will “review and update its regulatory framework as necessary to ensure that its high safety standard is maintained.” Design for Environment Product and service design is a focal point in the quest for sustainability. Design for environment (D FE) is an umbrella term describing techniques used to incorporate environmental concerns (including the three Rs of reduce, reuse, and recycle) into product design. The most common DFE practices include design for: frameangel/123RF Energy efficiency of product and energy used in manufacturing Hazardous material minimization, including emissions and wastes in manufacturing Biodegradable disposal, including packaging Reuse, including packaging Disassembly and remanufacture Recycling, including packaging See the “ Roots and Its Vegan Leather Products” OM in Action for an application. Page 147 OM in ACTION Roots and Its Vegan Leather ProductsD Rubens Alarcon/Alamy Stock Photo Roots is a Canadian company established in Toronto in 1973 to produce premium outdoor-lifestyle brand. The company operates both in Canada and the United States and ships products to more than 60 different countries through their e-commerce. Roots launched a new one size fits all leather products which are made from vegan leather that is safer and kinder for the environment. Moreover, the leather has a changing character over time, which gives it a rich patina and a one-of-a-kind look. The vegan leather is produced from vegan products, which is based on a method utilizing organic waste products to produce leather called Celium with the help of specific bacteria. Bacteria consume the organic wastes to produce cellulose. The resulting cellulose is churned and later stabilized to form leather-like qualities. Key aspects include cradle-to-grave assessment, end-of-life programs, the three Rs (reduce, reuse, and recycle) reduction of costs and materials used, reuse of parts of returned products, and recycling. Cradle-to-Grave Assessment Cradle-to-grave assessment is the assessment of the environmental impact of a product or service throughout its useful life, focusing on such factors as global warming (the amount of carbon dioxide released into the atmosphere), smog formation, oxygen depletion, and solid waste generation. For products, cradle-to-grave analysis takes into account impacts in every phase of a product’s life cycle, from raw material extraction from the earth, or the growing and harvesting of plant materials, through fabrication of parts and assembly operations, or other processes used to create products, as well as the use or consumption of the product, and final disposal at the end of a product’s useful life. It also considers energy consumption, pollution and waste, and transportation in all phases. Although services generally involve less use of materials, cradle-to-grave assessment of services is nonetheless important, because services consume energy and involve many of the same or similar processes that products involve. The goal of cradle-to-grave assessment is to choose products and services that have the least environmental impact while still taking into account economic considerations. End-of-Life Programs End-of-life (EOL) programs deal with products that have reached the end of their useful lives. The products include both consumer products and business equipment. The purpose of these programs is to reduce the dumping of products, particularly electronic equipment, in landfills or third-world countries, as has been the common practice, or incineration, which converts materials into hazardous air and water emissions and generates toxic ash. Although the programs are not limited to electronic equipment, that equipment poses problems because it typically contains toxic materials such as lead, cadmium, chromium, and other heavy metals. IBM provides a good example of the potential of EOL programs. Over the last 15 years, it has collected about 2 billion pounds of product and product waste. The Three Rs: Reduce, Reuse, and Recycle Designers often reflect on three particular aspects of potential cost savings and reducing environmental impact: reducing the use of materials through value analysis; refurbishing and then reselling returned goods that are deemed to have additional useful life, which is referred to as remanufacturing; and reclaiming parts of unusable products for recycling. Page 148 Reduce: Value Analysis Value analysis refers to an examination of the function of parts and materials in an effort to reduce the cost and/or improve the performance of a product. Typical questions that would be asked as part of the analysis include: Could a cheaper part or material be used? Is the function necessary? Can the function of two or more parts or components be performed by a single part for a lower cost? Can a part be simplified? Could product specifications be relaxed, and would this result in a lower price? Could standard parts be substituted for nonstandard parts? can guide a value analysis. Figure 4-6 provides a checklist of questions that FIGURE 4-6 Overview of value analysis 1. Select an item that has a high annual dollar volume. This can be material, a purchased item, or a service. 2. Identify the function of the item. 3. Obtain answers to these kinds of questions: a. Is the item necessary and have value, or can it be eliminated? b. Are there alternative sources for the item? c. Can the item be provided internally? d. What are the advantages of the present arrangement? e. What are the disadvantages of the present arrangement? f. Could another material, part, or service be used instead? g. Can specifications be less stringent to save cost or time? h. Can two or more parts be combined? i. Can more/less processing be done on the item to save cost or time? j. Do suppliers/providers have suggestions for improvements? k. Do employees have suggestions for improvements? l. Can packaging be improved or made less costly? 4. Analyze the answers obtained above, as well as the answers to other questions that arise, and then make recommendations. Reuse: Remanufacturing An emerging concept in manufacturing is the remanufacturing of products. Remanufacturing refers to refurbishing used products by replacing worn-out or defective components, and reselling the products. This can be done by the original manufacturer, or another company. Among the products that have remanufactured components are automobiles, printers, copiers, cameras, computers, and telephones. There are a number of important reasons for doing this. One is that a remanufactured product can be sold for about 50 percent of the cost of a new product. Another is that the process requires mostly unskilled and semiskilled workers. Also, in the global market, European lawmakers are increasingly requiring manufacturers to take back used products, because this means fewer products end up in landfills and there is less depletion of natural resources, such as raw materials and fuel. Designing products so they can be more easily taken apart has given rise to yet another design consideration: Design for disassembly (DFD). which includes using fewer parts and less material; using snap-fits and fewer screws, nuts, and bolts; and using no glue. It also means using accessible screws and bolts, and requiring only common hand tools to disassemble. Recycle Recycling is sometimes an important consideration for designers. Recycling means recovering materials for future use. This applies not only to manufactured parts but also to materials used during production, such as lubricants and solvents. Reclaimed metal or plastic parts may be melted down and used to make different products. Recycling requires using materials that can be recycled (e.g., thermoset plastics vs. thermoplastics), not adding fillers in plastics, and identifying the material on the part. Companies recycle for a variety of reasons, including Page 149 1. Cost savings 2. Environment concerns 3. Environmental regulations An interesting note: Companies that want to do business in the European Union must show that a specified proportion of their products are recyclable. The pressure to recycle has given rise to the term design for recycling (DFR), referring to product design that takes into account the ability to disassemble a used product to recover the recyclable parts. See the “ Nestlé Waters’ Recyclable Bottle Design” OM in Action for an application. OM in ACTION Nestlé Waters’ Recyclable Bottle Design MIHAI ANDRITOIU/Alamy Stock Photo Nestlé Waters introduced an environmentally friendly “eco-shape bottle.” The bottles are lighter in mass and their caps have fewer threads than the old bottles. The new bottles have reduced resin use and reduced energy cost with less carbon emission to the environment. With cooperation of the entire plastic value chain to increase PET recycling rate, and by using high quality recycled PET, the new Nestlé water bottles are 100 percent recyclable. Consequently, this new design helps Nestlé Waters improve environmental sustainability. 4.5 Quality Function Deployment LO5 Describe and perform quality function deployment (QFD). Obtaining input from customers is essential to assure that they will want what is offered for sale. Although obtaining input can be informal through discussions with customers, there is a formal way to document customer wants. Quality function deployment (QFD) is a structured approach for integrating the “voice of the customer” into product design. The purpose is to ensure that customer requirements are factored into every aspect of the process. Listening to and understanding the customer is the central feature of QFD. Customer requirements often take the form of a general statement such as, “It should be easy to adjust the cutting height of the lawn mower.” Once the customer requirements are known, they must be translated into measurable technical terms. For example, a statement about changing the height of the lawn mower may be translated into the characteristics of the mechanism used to accomplish that (e.g., tightness of the spring that controls the mechanism). For manufacturing purposes, these must be related to the materials, dimensions, and equipment used for processing. The structure of QFD is based on a set of matrices. The main matrix relates customer requirements (what) to their corresponding technical requirements (how); this matrix is Page 150 illustrated in Figure 4-7. The matrix provides a structure for data collection. Technical requirements are measurable physical and functional characteristics of the product. Additional features are usually added to the basic matrix to broaden the scope of analysis. Typical additional features include competitive evaluation of customer requirements, a correlation matrix for technical requirements (this can reveal conflicting technical requirements), and target values (product specs) for technical requirements. The matrix is often referred to as the house of quality because of its house-like appearance. This concept is illustrated in Figure 4-8. FIGURE 4-7 An example of the house of quality: The main QFD matrix Source: Ernst and Young Consulting Group, Total Quality (Homewood, IL: Dow-Jones Irwin, 1991), p. 121. FIGURE 4-8 The house of quality An example of a house of quality is shown in Figure 4-9 The data relate to a commercial printer (customer) and the company that produces the paper rolls. At first glance, the display appears complex. It contains a considerable amount of information for product and process planning. Therefore, let’s break it up into separate parts and consider them one at a time. To start, a key part is the list of customer requirements on the left side of the figure. Next, note the technical requirements, listed vertically near the top. The key relationships and their degree of importance are shown in the centre of the figure. The circle with a dot inside it indicates the strongest relationship; that is, it denotes the most important technical requirement(s) for satisfying the customer requirement (see the lower right-hand side for relationship weights). Now look at the “customer requirements importance” weights that are shown next to each customer requirement (3 is most important). Designers will take into account the importance values and the strength of correlation in determining where to focus the greatest effort. Page 151 FIGURE 4-9 An example of the house of quality for paper rolls used by a commercial printer Next, consider the correlation matrix at the top of the “house.” Of special interest is the strong negative correlation between “paper thickness” and “roll roundness.” Designers will have to find some way to overcome that or make a trade-off decision. On the right side of the figure is the competitive evaluation of customer requirements, comparing the paper roll manufacturing company’s performance on the customer requirements with each of its two key competitors (A and B). For example, the company (X) is worst on the first customer requirement and best on the third customer requirement. A line connects the X performances. Ideally, design will cause all of the Xs to be in the highest positions. Page 152 Across the bottom of Figure 4-9 are technical requirements importance weights, target values, and competitive evaluations of technical requirements, which can be interpreted in a manner similar to that of the competitive evaluation of customer requirements (note the line connecting the Xs). The target values typically contain technical specifications that are the result of the design process. A technical value (or specification) may have a norm (midpoint) and a tolerance (±). A tolerance is established to (a) make the fabrication and/or assembly of the product easier and (b) enable the product to perform its function with minimal adjustment. Usually, these two objectives are in conflict. Too tight a tolerance can ensure functional requirements, but is not cost-effective. Too loose a tolerance can reduce fabrication and assembly costs, but requires frequent rework to maintain the product’s performance. Technical requirements importance weights are the sums of values assigned to the relationships multiplied by customer requirements importance. For example, the importance to the customer for “paper will not tear” in the first column is 3, and the relationship between “paper width” and “paper will not tear” is weak (Δ equal to 1). Consequently, technical requirements importance weight is found as follows: (3 × 1) = 3 To acquire value 27 for technical requirements importance in the second column, multiply the relationship between “paper thickness” and “paper will not tear” (which is medium or equal to 3) by the importance to the customer for “paper will not tear” in the first column which is 3. Next, the importance to the customer for “no ink bleed” in the third column, 2, is multiplied by the relationship between “paper thickness” and “no ink bleed” (which is strong or equal to 9). The final step is to sum the result of the two steps mentioned above. (3 × 3) + (2 × 9) = 27 Perform similar calculations to find the technical requirements importance weights. Once all technical requirements importance weights are calculated, the higher scores are selected to be deployed. These help designers focus on important technical requirements. In this example, the first and last technical requirements have lower importance while the rest of the technical requirements all have high importance to be deployed. The house of quality approach involves a sequence of “houses,” beginning with design characteristics, which leads to specific components, then production processes, and finally, a quality plan. This sequence is illustrated in Figure 4-10. The construction of House 2 to House 4 is basically similar to construction of House 1, but the details are beyond the scope of this textbook. FIGURE 4-10 The house of quality sequence The “ A QFD Snapshot” OM in Action contains another example of house of quality. Page 153 OM in ACTION A QFD SnapshotE How a pencilmaker sharpened up its product by listening to “the voice of the customer” through quality function deployment. Devised by Japan’s Professor Yoji Akao, QFD has been winning adherents since it was transplanted to North America in the late 1980s. In this example of how it works, Writesharp Inc. is imaginary, but the technique in the accompanying diagram is real. First, Writesharp’s customers were surveyed to determine what they value in a pencil and how they rate the leading brands. Each wish list item was correlated with a pencil’s physical and functional characteristics. Reverse engineering—tearing down a competitor’s product to see its components and their workings—produced the competitive evaluation of technical requirements. An analysis of the matrix quickly revealed that the improvement with the biggest potential was “point lasts” (see competitive evaluation of customer requirements). This is largely correlated with “time between sharpenings” and “lead dust.” It was determined that these characteristics could be improved by using a better quality of lead. An interdepartmental team was assigned the task of evaluating new lead formulations that would last longer and generate less dust. The lead-formulation team organized its work with a similar matrix, segmented to show the physical and functional contributions of the ingredients in pencil lead. This revealed that the binder, or glue, used in forming the lead was the key variable. Tests found a polymer that dramatically reduced dusting by retaining more moisture and also wore down more slowly. While this binder was more expensive, better production controls promised to reduce waste enough to trim total per-pencil manufacturing costs by $0.01. 4.6 The Kano Model Page 154 LO6 Discuss the Kano model. The Kano model is a theory of product and service design developed by Noriaki Kano, a Japanese professor who offered a perspective on customer perceptions of quality different from the traditional view that “more is better.” Instead, he proposed different categories of quality and posited that understanding them would better position designers to assess and address quality needs. His model provides insights into the attributes that are perceived to be important to customers. The model employs three definitions of quality: basic, performance, and excitement. Basic quality refers to customer requirements that have only a limited effect on customer satisfaction if present, but lead to dissatisfaction if not present. For example, putting a very short cord on an electrical appliance will likely result in customer dissatisfaction, but beyond a certain length (e.g., one metre), adding more cord will not lead to increased levels of customer satisfaction. Performance quality refers to customer requirements that generate satisfaction or dissatisfaction in proportion to their level of functionality and appeal. For example, increasing the tread life of a tire or the amount of time house paint will last will add to customer satisfaction. Excitement quality refers to a feature or attribute that was unexpected by the customer and causes excitement (the “wow” factor), such as a voucher for dinner for two at the hotel restaurant when checking in. Figure 4-11a portrays how the three definitions of quality influence customer satisfaction or dissatisfaction relative to the degree of implementation. Note that features that are perceived by customers as basic quality result in dissatisfaction if they are missing or at low levels, but do not result in customer satisfaction if they are present, even at high levels. Performance factors can result in satisfaction or dissatisfaction, depending on the degree to which they are present. Excitement factors, because they are unexpected, do not result in dissatisfaction when they are absent or at low levels, but have the potential for disproportionate levels of satisfaction if they are present. FIGURE 4-11A The Kano model Over time, features that excited become performance features, and performance features soon become basic quality features, as illustrated in Figure 4-11b. The rates at which various design elements are migrating is an important input from marketing that will enable designers to continue to satisfy and delight customers and not waste efforts on improving what have become basic quality features. FIGURE 4-11B As time passes, excitement factors become performance factors, and performance factors become basic factors. The lesson of the Kano model is that design elements that fall into each aspect of quality must first be determined. Once basic needs have been met, additional efforts in those areas should not be pursued. For performance features, cost–benefit analysis comes into play, and these features should be included as long as the benefit exceeds the cost. Excitement features pose somewhat of a challenge. Customers are not likely to indicate excitement factors in surveys because they don’t know that they want them. However, small increases in such factors produce disproportional increases in customer satisfaction and generally increase brand loyalty, so it is important for companies to strive to identify and include these features when economically feasible. The Kano model can be used in conjunction with QFD as well as in Six Sigma projects (see Chapter 10 for a discussion of Six Sigma). Page 155 4.7 Failure Modes and Effects Analysis LO7 Discuss FMEA analysis. Failure modes and effects analysis (FMEA) is a structured method for identifying possible failures in a product, service, or process and then assessing their effects in order to find opportunities for improvement. In other words, FMEA is a structured approach for integrating the “voice of the engineer” into product or service design. The failure modes portion of FMEA refers to the various ways in which failures can occur, and asks the question: “What can go wrong?” The effects analysis portion refers to studying the results of those failures, and asks: “What would be the consequences of failure for the customer?” FMEA is typically used to evaluate a new product or process prior to implementation, but can also be useful when considering a redesign. The following steps are required to perform the analysis: 1. Identify the functions of the product or process. Write down its intended purpose. 2. For each function, identify all the ways failure could happen. List these potential failure modes. 3. For each failure mode, identify all the effects of failure for the customer. 4. For each effect, determine the severity rating, S, which is typically on a scale from 1 (insignificant) to 10 (catastrophic). 5. For each failure mode, determine all the causes of the failure. 6. For each cause, determine the occurrence rating, O, which is typically on a scale from 1 (extremely unlikely) to 10 (inevitable). 7. For each cause, determine the control mechanism currently in place to detect the failure. 8. For each control, determine the detection rating, D. This rating estimates how likely it is that the failure can be detected before the customer is affected. Detection is typically rated on a scale from 1 (detection is absolutely certain) to 10 (no detection). 9. Calculate the risk priority number (RPN) for each cause based on the severity of the effect, frequency of occurrence, and detection rating, by multiplying S × O × D. 10. List the RPN in descending order. This highlights the cause with the greatest need for improvement. 11. Identify recommended actions to lower severity or occurrence of failures, or improve their detection. 12. As actions are completed, update the S, O, and D ratings and new RPNs. See Table 4-2 for an example of FMEA for an ATM.4 Page 156 TABLE 4-2 FMEA for an ATM Resp Potential Potential Potential Current Failure Effects of Causes of Process Function Mode Failure S Failure O Control Dispense Dispenses Decreases 8 Out of cash 5 Low-cash cash for no cash customer customers or not satisfaction and Recommended D RPN 5 200 alert cash Jams 3 Jam alert 5 120 Electricity 2 Battery 2 32 outage Decreases too much profitability Action Increase bill Desig holder size soon possi enough Dispenses Com 6 Bills stuck backup 2 Riffle cash 7 84 3 Auto 1 18 together cash Denominations in wrong trays image verification 4.8 Characteristics of Service Design Page 157 LO8 List the major characteristics of service systems. There are many similarities between product and service design. However, there are some important differences as well, owing to the nature of services. One major difference is that unlike manufacturing, where production and delivery are usually separated in time, services are usually created and delivered simultaneously. Service refers to an act, something that is done to or for a customer (client, patient, etc.). It is provided by a service delivery system, which includes the facilities, processes, and skills needed to provide the service. Many services are not pure services, but part of a product bundle—the combination of goods and services provided to a customer. The service component in products is increasing. The ability to create and deliver reliable customer-oriented service is often a key competitive differentiator. Successful companies combine customer-oriented service with their products. System design involves development or refinement of the overall service package:5 1. The physical resources needed 2. The accompanying goods that are purchased or consumed by the customer, or provided with the service 3. Explicit services (the essential/core features of a service, such as tax preparation) 4. Implicit services (ancillary/extra features, such as friendliness, courtesy) Service operations managers must contend with issues that may be insignificant or nonexistent for managers in a production setting. These include the following: 1. Products are generally tangible; services are generally intangible. Consequently, service Page 158 design often focuses more on intangible factors (e.g., peace of mind, ambiance) than does product design. 2. In many instances, services are created and delivered at the same time (e.g., a haircut, a car wash). In such instances, there is less latitude in finding and correcting errors before the customer has a chance to discover them. Consequently, training, process design, and customer relations are particularly important. 3. Services cannot be inventoried. This poses restrictions on flexibility and makes capacity issues very important. 4. Services that are highly visible to consumers and must be designed with that in mind; this adds an extra dimension to process design, one that usually is not present in product design. 5. Some services have low barriers to entry and exit. This places additional pressures on service design to be innovative and cost-effective. 6. Location is often important to service design, with convenience as a major factor. Hence, design of services and choice of location are often closely linked. 7. Service systems range from those with little or no customer contact to those that have a very high degree of customer contact. Here are some examples of those different types: Insulated technical core; little or no customer contact (e.g., software development) Production line; little or no customer contact (e.g., automatic car wash) Personalized service (e.g., haircut, medical service) Consumer participation (e.g., diet program, dance lessons) Self-service (e.g., supermarket) If there is little or no customer contact, service system design is like product system design. Service can be much more standardized, whereas high contact provides the opportunity to tailor the service to the precise needs of individual customers. For example, see Figure 4-12, which shows different types of clothes retailing. FIGURE 4-12 The relationship between service variability and customer contact in retail clothes selling 8. Demand variability alternately creates customer waiting times, which sometimes leads to lost sales, or idle service resources. When demand variability is a factor, designers may approach service design from one of two perspectives. One is a cost and efficiency perspective, and the other is a customer perspective. Waiting line analysis (see Chapter 18) can be especially useful in this regard. Basing design objectives on cost and efficiency is essentially a “product design approach” to service design. Because customer participation makes both quality and demand variability more difficult to manage, designers may opt to limit customer participation in the process where possible. Alternatively, designers may use staff flexibility as a means of dealing with demand variability. In services, a significant aspect of perceived quality relates to the intangibles that are part of the service package. Designers must proceed with caution because attempts to achieve a high level of efficiency tend to depersonalize service and to create the risk of negatively altering the customer’s perception of quality. Such attempts may involve the following: Reducing consumer choices makes service more efficient, but it can be both frustrating and irritating for the customer. An example would be a cable company that bundles channels, rather than allowing customers to pick only the channels they want. Standardizing or simplifying certain elements of service can reduce the cost of providing a service, but it risks eliminating features that some customers value, such as personal attention. Incorporating flexibility in capacity management by employing part-time or temporary staff may involve the use of less-skilled or less-interested people, and service quality may suffer. Challenges of Service Design Variability is a major concern in most aspects of business operations, and it is particularly so in the design of service systems. Requirements tend to be variable, both in terms of differences in what customers want or need, and in terms of the timing of customer requests. Because services generally cannot be stored, there is the additional challenge of balancing supply and demand. This is less of a problem for systems in which the timing of services can be scheduled (e.g., doctor’s appointment), but not so in others (e.g., emergency room visit). Another challenge is that services can be difficult to describe precisely and are dynamic in nature, especially when there is a direct encounter with the customer (e.g., personal services), due to the large number of variables. Service design challenges are outlined in Page 159 Figure 4-13. FIGURE 4-13 The challenges of managing services Services can pose a variety of managerial challenges—challenges that in manufacturing are either much less or nonexistent. And because services represent an increasing share of the economy, this places added importance on understanding and dealing with the challenges of managing services. Here are some of the main factors: Jobs in service environments are often less structured than in manufacturing environments. Customer contact is usually much higher in services. In many services, worker skill levels are low compared to those of manufacturing workers. Services are adding many new workers in low-skill, entry-level positions. Employee turnover is often higher, especially in the low-skill jobs. Input variability tends to be higher in many service environments than in manufacturing. Service performance can be adversely affected by workers’ emotions, distractions, customers’ attitudes, and other factors, many of which are beyond managers’ control. Because of these factors, quality and costs are more difficult to control, productivity tends to be lower, the risk of customer dissatisfaction is greater, and employee motivation is more difficult. There are a number of characteristics of well-designed service systems. They can serve as guidelines in developing a service system. They are summarized in Figure 4-14. FIGURE 4-14 Characteristics of well-designed service systems 1. Have a single, unifying theme, such as convenience or speed. This will help personnel work together rather than at cross-purposes. 2. Ensure that the service delivery system has the capability to handle any expected variability in service requirements. 3. Include design features and checks to ensure that service will be reliable and will provide consistently high quality. 4. Design the service delivery system to be user friendly. This is especially true for selfservice systems. Service Blueprinting A useful tool for conceptualizing a service delivery system is the service blueprint, which is a method for describing and analyzing a service process. A service blueprint is much like an architectural drawing, but instead of showing building dimensions and other construction features, a service blueprint shows the basic customer and service actions involved in a service operation. Figure 4-15 illustrates a simple service blueprint for a restaurant. At the top of the figure are the customer actions, and just below are the related actions of the direct contact service people. Next are what are sometimes referred to as “backstage contacts”—in this example, the kitchen staff—and below those are the support, or “backroom,” operations. In this example, support operations include the reservation system, ordering of food and supplies, cashier, and the outsourcing of laundry service. Figure 4--15 is a simplified illustration; typically time estimates for actions and operations would be included. FIGURE 4-15 A simple service blueprint for a restaurant The major steps in service blueprinting are as follows: 1. Establish boundaries for the service and decide on the level of detail needed. 2. Identify and determine the sequence of customer and service actions and interactions. A flowchart can be a useful tool for this. 3. Develop time estimates for each phase of the process, as well as time variability. 4. Identify potential failure points and develop a plan to prevent or minimize them, as well as a plan to respond to service errors. 4.9 Global Product and Service Design Page 160 LO9 Discuss global product and service design. Traditionally, product design has been conducted by members of the design team who are located in one facility or a few nearby facilities. However, organizations that operate globally are discovering advantages in global product design, which uses the combined efforts of a team of designers who work in different countries and even on different continents. Such virtual teams can provide a range of comparative advantages over traditional teams such as engaging the best human resources from around the world without the need to assemble them all in one place, and operating on a 24-hour basis, thereby decreasing the time-to-market. The use of global teams also allows for customer needs assessment to be done in more than one country with local resources, opportunities, and constraints to be taken into account. Global product design can provide design outcomes that increase the marketability and utility of a product. The diversity of an international team may yield different points of view and also ideas and information to enrich the design process. However, care must be taken in managing the diversity, because if it is mismanaged, it can lead to conflicts and miscommunications. Product designers in companies that operate globally also must take into account any cultural differences of different countries or regions related to the product. This can result in different designs for different countries or regions. Advances in information technology have played a key role in the viability of global product design teams by enabling team members to maintain continual contact with each other and to instantaneously share designs and progress, and to transmit engineering changes and other necessary information. See the “ Draganfly Innovations” OM in Action for an interesting example of a global product design. Page 161 OM in ACTION Draganfly Innovations Courtesy of Draganfly Innovations, Inc., www.draganfly.com Saskatoon-based Draganfly Innovations Inc. designs and builds unmanned aerial vehicles (UAVs). Commonly known as drones, UAVs have a host of potential military and civilian applications. Careful design decisions made by Draganfly engineers ensure that the drones excel at providing fast and reliable situational awareness wherever needed. Available fourengine and six-engine designs provide the power that Draganfly drones need to field a wide range of payload options. When onsite, the drones help provide law enforcement with situational awareness and the capability to take aerial surveillance video and shoot high-resolution photos. Recently, Draganfly has been working on a new technology (originally developed to monitor heart rate for babies) to be used to detect people infected with COVID-19. This company is using the technology in drones with closed circuit cameras to monitor patients from 50 metres away. They use a thermal imaging technology and cameras and a computer program with a learning algorithm. This technology can be used as an early warning system to measure temperature, heart rate, and respiratory rate to determine if a person has a respiratory or an infectious illness. 4.10 Operations Strategy LO10 Describe how product and service design contributes to competitive advantage. Product and service design is a fertile area for achieving competitive advantage and/or increasing customer satisfaction. Potential sources of such benefits include the following: Packaging products and ancillary services to increase sales. Examples include selling laptops at a reduced cost with a two-year internet access sign-up agreement, offering extended warranties on products, offering installation and service, and offering training with computer software. Using multiple-use platforms. Auto manufacturers use the same platform (basic chassis, say) for several nameplates (e.g., Jaguar S type, Lincoln LS, and Ford Thunderbird have shared the same platform). There are two basic computer platforms, PC and Mac, with many variations of computers using a particular platform. Implementing tactics that will achieve the benefits of high volume while satisfying customer needs for variety, such as mass customization. Continually monitoring products and services for small improvements rather than the “big bang” approach. Often, the “little” things can have a positive, long-lasting effect on consumer attitudes and buying behavior. Shortening the time it takes to get new or redesigned goods and services to market. A key competitive advantage of some companies is their ability to bring new products to market more quickly than their competitors. Companies using this “first-to-market” approach are able to enter markets ahead of their competitors, allowing them to set higher selling prices than otherwise due to absence of competition. Such a strategy is also a defense against competition from cheaper “clones” because the competitors always have to play “catch up.” From a design standpoint, reducing the time to market involves: Using standardized components to create new but reliable products. Using technology such as computer-aided design (CAD) equipment to rapidly design new or modified products. Concurrent engineering to shorten engineering time. SUMMARY The design process involves market/competitor analysis, goal setting (product, performance, cost, quality), quality function deployment, concept design, product specification, and building and testing prototypes. Page 162 Research and development efforts can play a significant role in product and process innovations. The idea for a new or redesigned product can come from customers, employees, suppliers, competitors, or the research and development department. The life cycle stage of a product influences the nature of its redesign. It is faster and less costly for the product team to perform both product and process designs concurrently. CAD has helped reduce the design time significantly. It is cheaper overall to design products that have fewer parts and are easier to manufacture and assemble. Reliability of a product or service is often a key dimension in the eyes of the customer. Measuring and improving reliability are important aspects of product and service design, Reliability management involves establishing, achieving, and maintaining reliability objectives for products. Achieving reliability usually falls to reliability engineers who use a variety of techniques to build reliability into products (e.g., by using reliable key components), test their performance, and estimate their reliability. Using a more durable and higher-quality material, and reducing the number of components in a product are some examples of ways to increase reliability. It may be cheaper to design robust products that perform consistently in varied production and use conditions. Using standard parts and common modules saves operating costs, but it is possible to provide some mass customization by allowing customers options on modules and postponing the finishing of products through the delayed differentiation tactic. QFD is a multi-functional process for product design that starts with the “voice of the customer” and ends with its translation into product characteristics. The Kano model is a way of understanding product and service quality based on the dimensions of basic, performance, and excitement attributes. FMEA is a technique for identifying failures to find opportunities for improvement. Although product design and service design are similar in some respects, a number of key differences exist between products and services that influence the way they are designed. Services need to deal with customer presence and involvement, and the inherent variability in service requirements. Service blueprinting is a useful tool for showing how a service is performed and includes inputs, processes, and outputs. Global product design can provide design outcomes that increase the marketability and utility of a product. The diversity of an international team may yield different points of view and ideas and information to enrich the design process. KEY TERMS computer-aided design (CAD) concurrent engineering cradle-to-grave assessment delayed differentiation design for assembly (DFA) design for disassembly (DFD) design for environment (DFE) design for manufacturing (DFM) design for recycling (DFR) failure global team life cycle manufacturability mass customization modular design normal operating conditions product bundle product liability product life cycle management (PLM) product or service design quality function deployment (QFD) recycling redundancy reliability remanufacturing research and development (R&D) reverse engineering robust design serviceability service blueprint service deliverysystem service package standardization value analysis (VA) value engineering (VE) SOLVED PROBLEMS Page 163 Problem 1 Due to the extreme cost of interrupting production, a manufacturer has two standby machines available in case a particular machine breaks down. The machine in use has a reliability of 0.94, and the backups have reliabilities of 0.90 and 0.80. In the event of a failure, a backup machine is brought into service. If this machine also fails, the other backup is used. Calculate the system reliability. Solution R = 0.94, 1 R 2 = 0.90, and R 3 = 0.80 The system can be depicted in this way: R system = R 1 + R 2 (1 − R 1 ) + R 3 (1 − R 2 )(1 − R 1 ) = 0.94 + 0.90(1 − 0.94) + 0.80(1 − 0.90)(1 − 0.94) = 0.9988 Problem 2 A product designer must decide if a redundant component is cost-justified in a product. The product in question has a critical component with a probability of 0.98 of operating. Product failure would involve a cost of $20,000. For a cost of $100, a switch and backup component could be added that would automatically transfer the control to the backup component in the event of a failure. Should the backup component be added if its operating probability is also 0.98? Solution Because no probability is given for the switch, we will assume that its probability of operating when needed is 1.00. The expected cost of failure (i.e., without the backup) is $20,000 (1– 0.98) = $400. With the backup, the probability of not failing would be: 0.98 + 0.02(0.98) = 0.9996 Hence, the probability of failure would be 1– 0.9996 = 0.0004. The expected cost of failure with the backup would be the added cost of the backup component plus the failure cost: $100 + $20,000(0.0004) = $108 Because this ($108) is less than the expected cost without the backup ($400), adding the backup component is definitely cost-justified. Problem 3 A hospital has one fire alarm system with two backup systems. The reliability of the first one is 0.95, and the reliability of the backups are 0.97 and 0.99, respectively. In the event of a fire, what is the probability that a warning would be given? Page 164 Solution A warning would not be given if all three alarms failed. The probability that at least one alarm would operate is 1 − P(none operate): P (none operate) = (1 − 0.95)(1 − 0.97)(1 − 0.99) = 0.000015 P (warning) = 1 − 0.000015 = 0.999985 Alternatively, P (warning) = 0.95 + 0.97 (1 − 0.95) + 0.99 (1 − 0.95) (1 − 0.97) = 0.999985 Problem 4 Service blueprint. Prepare a service blueprint on how to apply for a home equity loan from a bank. Solution Problem 5 Examine and compare one of the following product sets. Base your comparison on such factors as features, costs, convenience, ease of use, and value. a. Online shopping versus “bricks and mortar” shopping b. Standard gasoline automobile engines versus hybrids c. Satellite television versus cable Solution a. Online shopping versus “bricks and mortar” shopping: Online shopping requires Page 165 that a customer have Internet access; bricks and mortar shopping does not. Online shopping allows a customer to place orders from any location—bricks and mortar shopping requires that a customer place orders at the bricks and mortar location. Online shopping normally does not allow easy access to a salesperson—bricks and mortar shopping does. Online shopping still is cheaper due to lower costs. Online shopping offers a wider variety of products than does bricks and mortar shopping; however, customers must be willing to wait for their products to be delivered. Online shopping is more convenient given that a customer can be at any location to place an order. Customers may find higher value in the online experience given the convenience, the wider product selection, and lower (or equal) prices. b. Standard gasoline automobile engines versus hybrids: Standard gasoline engines offer greater power than hybrids do. However, standard engines create more emissions and provide lower gas mileage. Standard engines cost less and are arguably more convenient when trying to merge onto a highway. Value depends on the user’s driving habits and environmental concerns. For example, a user who has high concern for protecting the environment will perceive higher value in the hybrid. c. Satellite television versus cable: Satellite television receives the transmission from a dish on the customer’s roof—cable receives the transmission from a cable outside connected to a cable box in the customer’s home. Satellite television may not offer some of the local stations (e.g., public access) that cable offers. Satellite television is subject to outages during bad weather (is less convenient)—cable is not. Cost and value of both options depend on the service options selected by customers. DISCUSSION AND REVIEW QUESTIONS 1. What are some of the factors that cause organizations to redesign their products? LO1 2. What are the stages (phases) of the product design process? LO2 3. What are the stages (phases) of the service design process? LO2 4. Name some ways in which the R&D department of a company contributes to product design. LO3 LO3 5. What is reverse engineering? Give an example. Do you feel it is unethical? 6. What is CAD? Describe some of the ways a product designer can use it. LO4 7. What is standardization? Give an example. Name some of the main advantages and disadvantages of standardization. LO4 8. What is modular design? Give an example. What are its main advantages and disadvantages? LO4 9. Explain the term remanufacturing. LO4 10. Explain the terms design for manufacturing and design for assembly, give an example of each, and briefly explain why they are important. LO4 LO4 11. What is the difference between value analysis (VA) and value engineering (VE)? 12. What is concurrent engineering and what are some of the competitive advantages of concurrent engineering? LO4 13. What is meant by the term life cycle? Give an example. Why would this be a consideration in product design? LO4 14. What is mass customization? What is delayed differentiation? Give an example. 15. Define the term reliability and give an example. LO4 16. Explain why a product might have an overall reliability that is low even though its components have fairly high reliabilities. LO4 17. What is redundancy, and how can it improve product reliability? 18. Explain the term robust design. Give an example. LO4 19. What is life cycle assessment, and what is its overall goal? LO4 LO4 LO4 20. Explain the term ?three Rs? and how the three Rs relate to sustainability. LO4 21. Explain what quality function deployment (QFD) is, how it is done, and what its objective is. LO5 22. Select an electronic device you are familiar with. What standard feature does it have that was once a ?wow? feature? What ?wow? feature does it have that you think will soon be a standard feature on new versions? LO6 23. Name a service organization and describe the basic service(s) it provides. 24. Name two factors that make service design different from goods design. LO8 LO8 TAKING STOCK 1. Describe some of the trade-offs that are encountered in product design. LO1 - LO5 2. Who needs to be involved in the design of products and services? Explain. 3. How has technology had an impact on product and service design? LO1 - LO2 LO4 4. Is designing products that are not refurbishable or recyclable, such as computers and electronics that end up in city garbage dumps, unethical? Discuss. LO4 CRITICAL THINKING EXERCISES 1. Think of a new or revised good or service that you would like to see on the Page 166 market. Discuss the implications of designing and producing that product relative to legal, profitability, competitiveness, design, and production issues. LO1 - LO4 2. The speed of product development has continued to increase because of technological advances such as CAD. Do you expect this trend to continue? LO4 3. Give two examples of unethical conduct involving product or service design and the ethical principles LO4 4. In wintry conditions, highway safety is improved by treating road surfaces with substances that will provide traction and/or melt snow and ice. Sand and rock salt are two widely used substances. Recently, a combination of beet juice and rock salt started being used in some parts of the country to treat road surfaces. Suppose you have been asked to provide a list of factors to consider for a switch from rock salt alone to using a combination of beet juice and rock salt. Name the major considerations you would take into account in making a decision in the following categories: cost considerations; environmental considerations, both positive and negative; and other considerations. LO1 – LO3 5. A number of fast-food chains, after their success with offering their customers fresh salads and in an effort to downplay the image of selling unhealthy food, began adding fresh fruit plates to their menus. At about the same time, and seemingly in direct conflict with this “healthy” strategy, several other fast-food chains began offering fat- and calorie-laden items to their menus. Compare these two widely different approaches, and predict the chances of each one’s success. Name some other products that are popular, despite known health risks. LO4 6. Suppose a company intends to offer a new service to some of its internal customers. Briefly discuss how the fact that the customers are internal would change the process of managing the four phases of the service life cycle. LO3 PROBLEMS 1. Examine and compare one of the following product sets. Base your comparison on such factors as features, costs, convenience, ease of use, and value. Page 167 LO4 Page 168 a. GPS versus maps b. Cellphones versus landlines c. Online course versus classroom 2. Determine the reliability of each system as follows: LO4 a. b. Each system component has a backup with a reliability of 0.90 and a switch that is 100 percent reliable. 3. A product is composed of four parts in a series design. In order for the product to function properly, each of the parts must function. Two of the parts each have 0.96 probability of functioning, and the other two each have probability of 0.99. What is the overall probability that the product will function properly? LO4 4. A system consists of three identical components. In order for the system to perform as intended, all of the components must perform. Each component has the same probability of performance. If the system is to have 0.92 probability of performing, what probability of performance is needed by each of the individual components? LO4 5. A car has four independent and identical tires. The reliability of a tire is 0.99. If any tire is flat, the car cannot be driven. Calculate the LO4 reliability of a car with respect to its tires. 6. A computer has two independent and identical central processing units (CPUs). The computer will operate if at least one CPU operates. The reliability of a CPU is 0.99. Calculate the reliability of the computer with respect to its CPUs. LO4 7. A plane has two independent and identical engines. At least one engine should operate for the plane not to crash. The reliability of an engine is 0.999. Calculate the reliability of the plane with respect to its engines. LO4 8. A communication network between two cities, A and B, consists of five independent and identical relay units forming a bridge network as shown below. For the network to work, a least one path between the two cities should work. If the reliability of each relay is 0.99, what is the reliability of the network RN? (Hint: R = 1 − Sum of probability that any minimal two or three relays that together cut off the network will fail simultaneously. Specifically, any of sets of relays 1&4, 2&5, 1&3&5, and 2&3&4 cut off the two cities.) LO4 N 9. The guidance system of a ship is controlled by a computer that has three major modules. In order for the computer to function properly, all three modules must function. Two of the modules have reliability of 0.97, and the other has reliability of 0.99. LO4 a. What is the reliability of the computer? b. A backup computer identical to the one being used can be installed to improve overall reliability. Assuming that the new computer can automatically function if the first computer fails, determine the resulting reliability. c. If the backup computer must be activated by a switch in the event that the first computer fails, and the switch has a reliability of 0.98, what is the overall reliability of the system? (Both the switch and the backup computer must function in order for the backup system to function.) 10. One of the industrial robots designed by a leading producer has four major components. Components? reliability are 0.98, 0.95, 0.94, and 0.90. All of the components must function in order for the robot to operate effectively. LO4 a. Calculate the reliability of the robot. b. Designers want to improve the reliability of the robot by adding a backup component. Due to space limitations, only one backup can be added. The backup for any component will have the same reliability as the unit for which it is the backup. Which component should get the backup in order to achieve the highest reliability of the robot? c. If one backup with a reliability of 0.92 can be added to any one of the main components, which component should get it to achieve the highest overall reliability? 11. A production line has three machines A, B, and C, with reliabilities of 0.99, 0.96, and 0.93, respectively. The machines are arranged so that if one breaks down, the others must shut down. Engineers are weighing two alternative designs for increasing the line?s reliability. Plan 1 involves adding an identical backup line (i.e., a series backup), and Plan 2 involves providing a backup for each machine (i.e., a parallel backup). In either case, three additional machines (A, B, and C) would be used with reliabilities equal to the original three. LO4 a. Which plan will provide higher reliability? Plan 1: Adding an identical backup line Plan 2: Providing a backup for each machine b. Explain why the two reliabilities are not the same. c. What other factors might enter into the decision of which plan to adopt? 12. Refer to Problem 11. LO4 a. Assume that a single switch is used in Plan 1 to transfer production to the backup line if the first line fails, and this switch is 98 percent reliable, while reliabilities of the machines remain the same. Recalculate the reliability of Plan 1. Compare this reliability with the reliability of Plan 1 calculated in solving the original problem. How much did reliability of Plan 1 decrease as a result of a 98 percent reliable switch? b. Assume that three switches are used in Plan 2 to transfer production to the backup machines if the original machines fail, and these switches are all 98 percent reliable, while reliabilities of the machines remain the same. Recalculate the reliability of Plan 2. Compare the reliability of this plan with the reliability of Plan 2 calculated in solving the original problem. How much did reliability of Plan 2 decrease? 13. A web server has five major components that must all function in order for it to operate as intended. Assuming that each component of the system has the same reliability, what is the reliability each one must have in order for the overall system to have a reliability of 0.98? LO4 14. Repeat Problem 13 under the condition that one of the components will have a backup with reliability equal to that of any one of the other components. LO4 15. Hoping to increase the chances of reaching a performance goal, the director of a research project has assigned the same task to three separate research teams. The director estimates that the team probabilities for successfully completing the task in the allotted time are 0.9, 0.8, and 0.7. Assuming that the teams work independently, what is the probability that the project will not be completed in time? LO4 a. Refer to Figure 4-9. What two technical requirements have the highest impact on the customer requirement ?Paper will not tear?? Explain why. b. The following table presents technical requirements and customer requirements for the output of a laser printer. First, decide if any of the technical requirements relate to each customer requirement. Decide which technical requirement, if any, has the greatest impact on that customer requirement. LO5 TECHNICAL REQUIREMENTS Customer Requirements Type of Paper Internal Paper Feed Print Element Paper doesn’t wrinkle Prints cleanly Easy to use 16. Prepare a house of quality for chocolate chip cookies made in a bakery. List what you believe are the three most important customer requirements and the three most relevant technical requirements. Next, indicate by a checkmark which customer requirements and which technical requirements are related. Finally, determine the target values. There is no need to fill in the other parts of the house. LO5 17. Determine a house of quality for a ballpoint pen. In the house of quality, fill in three customer requirements. Determine one technical requirement for each customer requirement and fill it in. Relate the pair by a checkmark, and determine a reasonable target value for each technical requirement and fill it in. LO5 5 18. The following five customer requirements are considered important for a loaf of bread: 5 crust should be golden brown, inside should be ? light? (i.e., have the right size and even distribution of holes), inside should not be too moist or too dry (i.e., elastic enough), inside should be a creamy white colour, and the bread should have the right flavour. Enter these in a house of quality, and determine one (unique) design characteristic for each customer requirement. Also, determine a reasonable target value/specification for each design characteristic. LO5 19. Perform a failure modes and effects analysis for a truck tire. LO7 20. Prepare a service blueprint for each of these post office transactions: LO8 a. Buy stamps from a machine. b. Buy stamps from a postal clerk. 21. Prepare a table similar to Figure 4-12. Then place each of these transactions in the appropriate cell of the table: LO8 a. Buy stamps from a postal clerk. b. Mail a package that involves checking different rates. c. Send money using Western Union. 22. Prepare a table similar to Figure 4-12 and place each of these banking transactions in the appropriate cell of the table: LO8 a. Make a cash withdrawal from an automated teller machine (ATM). b. Make a savings deposit using a teller. c. Open an account. d. Apply for a mortgage loan. 2 23. A product engineer has developed the following equation for the cost of a component: C = (10P ) , where C is the cost in dollars and P is the probability that the component will operate as expected. The product is composed of two of these components, both of which must operate for the product to operate. The engineer can spend a total of $173 for the two components. To the nearest two decimal places, what is the largest component reliability that can be achieved? LO4 24. In practice, for a series system the failure rate is estimated by adding the failure rates of its components. For a system made of n identical components in series, each having a probability of failure = Pf , probability of system failure is approximately n(Pf) provided that Pf is sufficiently small. Choose a value of n > 1 and P < 0.05, and show the above result. f LO4 MINI-CASE Page 169 Mini-Case McDonald’s Menus in Various Countries In order to be successful around the globe, McDonald’s has regionalized its menu items to conform to local culinary preferences, laws, and religious traditions. Below are a sample of items that appear on McDonald’s menus in various countries. Canada: Poutine (french fries and cheese curds with brown gravy) China: Chicken nuggets with chili garlic sauce, green tea ice cream Chile: Cheese empanadas Finland: Hamburgers with salsa and sour cream France: Beer for breakfast, burgers containing crispy peppers for lunch India: Spicy chicken wrap, rice bowls, masola wedges, tikki burgers Israel: Burgers are cooked over charcoal instead of fried Malaysia: Chicken porridge Netherlands: Fried chicken with peanut sauce Norway: Deep-fried fish, chicken salsa Philippines: Spaghetti, cheesy butter french fries Portugal: Kale soup, cream of carrot, bean and spinach soup Singapore: Salted egg yolk chicken burgers, curry sauce dip for chicken nuggets South Korea: Shrimp burger, pork burger, affogata (vanilla gelato with a shot of hot espresso) Taiwan. Corn soup, rice patties Turkey: Spiced mincemeat patty, cold savory yogurt beverage mixed with salt Questions 1. What effects do cultural differences have on the design of fast-food offerings in this reading? 2. What functions in the organization are impacted by the differences in product offerings among different countries? To access “Reliability,” the supplement to Chapter 4, please visit Connect. SUPPLEMENT TO CHAPTER 4 Reliability Page 4S-1 LEARNING OBJECTIVES After completing this supplement, you should be able to: LO1 Find the reliability or probability of functioning for a given length of time, and define failure rate per hour, mean time to failure, and availability. SUPPLEMENT OUTLINE Introduction Finding Reliability orProbability of Functioning for a Given Length of Time 4S.1 Introduction Page 4S-2 LO1 Find the reliability or probability of functioning for a given length of time, and define failure rate per hour, mean time to failure, and availability. Reliability is a measure of the ability of a product, part, equipment or system to perform its intended function under a prescribed set of conditions. In effect, reliability is a probability. Reliability is an important dimension of product quality. Reliability management involves establishing, achieving, and maintaining reliability objectives for products (e.g., the expected life of a particular make of light bulb may be specified to be 5,000 hours). Achieving reliability usually falls to reliability engineers who use a variety of techniques to build reliability into products (e.g., by using reliable key components), test their performance, and estimate their reliability. If the reliability is inadequate, the types of failure and their effect on the product should be determined, their root cause(s) identified, and potential failure prevented. Engineers and designers have a number of techniques at their disposal for assessing reliability. A discussion of those techniques is not within the scope of this text. Instead, let us turn to the issue of quantifying overall product or system reliability. Reliability of a product, part or equipment is used in two ways. 1. Reliability when activated. 2. Reliability for a given length of time. The first of these focuses on one point in time and is often used when a product or part or equipment must operate for one time, such as a missile or an air bag in a car. (more detail in Chapter 4) The second of these focuses on the length of service, such as most other products (e.g., a car). The distinction will become more apparent as each of these approaches is described in more detail. We will mainly focus on reliability measurement, which involves statistics and probability theory. The average reliability of a part is measured by testing several units over time until some or all fail. However, this time may be very long (several years). To accelerate this, the items are stressed by using extreme environmental conditions such as high temperature, temperature cycles (e.g., hot–cold), high humidity, high vibration, high voltage, surges in power, etc. The resulting life estimate is then adjusted appropriately. Reliability of a product is determined from the reliability of its parts. 4S.2 Finding Probability of Functioning for a Given Length of Time The second way of looking at reliability considers a use factor, usually the time dimension: probabilities are determined relative to a specified length of time. This approach is most common. Product warranties (e.g., one year free repair) should be based on this definition of reliability. Numberof Failures FailureRateperhour = TotalOperatingHours If failure rate is constant over time, time–quantity transposition is applicable: one way is to reduce the test time but use more test items. For example, in the above example, instead of 200 items tested for 2,500 hours, the reliability engineer could have used 400 items tested for 1,250 hours. Figure 4S-1. Because of its shape, it is referred A typical profile of failure rate over time is shown in to as the bathtub curve. Usually, a number of products or parts fail shortly after they are put into service, because they are defective to begin with. Examples include electronics components such as capacitors. The rate of failure decreases rapidly as the defective items are weeded out. During the second phase, random failures occur. In many cases, this phase covers a relatively long period of time (several years). In the third phase, failures occur because the items are worn out, and the failure rate increases. FIGURE 4S-1 Failure rate is generally a function of time and follows the bathtub curve. The following example illustrates the bathtub curve. In a reliability testing study, 1,000 light bulbs were lighted until they failed. Each failure time was recorded. The number of light bulbs remaining (survivors) over time can be seen in Figure 4S-2. Note that initially and close to the end, there are sharp drops in the number of light bulbs remaining (survivors), reflecting the burn-in and wear-out phases, respectively. Page 4S-3 FIGURE 4S-2 Number of light bulbs remaining over time. The inverse of failure rate per hour is mean time to failure (MTTF), the average length of time (in hours) before failure. For data in Example 4S-1, MTTF = 1/Failure rate per hour = 1/0.000004016 = 249,000hours Note that this formula assumes that failure rate is constant. EXAMPLE 4S-1 Two hundred units of a particular component were subjected to accelerated life testing equivalent to 2,500 hours of normal use. One unit failed after 1,000 hours and another after 2,000 hours. All other units were still working at the conclusion of the test. What is the failure rate per hour? SOLUTION TotalOperatingHours = [198 × 2500] + [1 × 1000] + [1 × 2000] = 498000FailureRateperHour= 2/4980 Note that this formula assumes constant failure rate over time. For repairable items, a similar term, mean time between failures (MTBF), is usually used. MTBF is the average time from the uptime after the repair following a failure to the next failure. The time to failure of a non-repairable item during the steady-state phase can often be modelled by the exponential distribution with an average equal to the MTTF (see Figure 4S-3). Similar results hold for repairable items. The probability that the item put into service at time 0 will fail before some specified time, T, is equal to the area under the curve between 0 and T. Reliability of the item is the probability that it will last at least until time T; therefore, reliability is equal to the area under the curve beyond T. (Note that the total area under the curve is 100 percent.) Observe that as the specified length of service increases, the area under the curve to the right of that point (i.e., the reliability of the item) decreases. Page 4S-4 FIGURE 4S-3 An exponential distribution The exponential distribution is completely described using a single parameter, its average, in this case the mean time to failure (or between failures). Using the symbol T to represent length of service, the reliability or probability that failure will not occur before time T (i.e., the area in the right tail) is easily determined by: Reliability = P (no f ailure bef oreT ) = e −T / MTTF where e ≈ 2.7183 T = Length of service bef ore f ailure MTTF = Mean time to f ailure The probability that failure will occur before time T is 1 minus reliability: P (f ailure bef oreT ) = 1 − e Selected values of e −T /MTTF −T / MTTF (i.e., reliability), given values for T/MTTF, are listed in Table 4S-1. TABLE 4S-1 Values of reliability = e–T/MTTF T/MTTF e–T/MTTF T/MTTF e–T/MTTF T/MTTF e–T/MTTF 0.10 0.9048 2.60 0.0743 5.10 0.0061 0.20 0.8187 2.70 0.0672 5.20 0.0055 0.30 0.7408 2.80 0.0608 5.30 0.0050 0.40 0.6703 2.90 0.0550 5.40 0.0045 0.50 0.6065 3.00 0.0498 5.50 0.0041 0.60 0.5488 3.10 0.0450 5.60 0.0037 0.70 0.4966 3.20 0.0408 5.70 0.0033 0.80 0.4493 3.30 0.0369 5.80 0.0030 0.90 0.4066 3.40 0.0334 5.90 0.0027 1.00 0.3679 3.50 0.0302 6.00 0.0025 1.10 0.3329 3.60 0.0273 6.10 0.0022 1.20 0.3012 3.70 0.0247 6.20 0.0020 1.30 0.2725 3.80 0.0224 6.30 0.0018 1.40 0.2466 3.90 0.0202 6.40 0.0017 1.50 0.2231 4.00 0.0183 6.50 0.0015 1.60 0.2019 4.10 0.0166 6.60 0.0014 1.70 0.1827 4.20 0.0150 6.70 0.0012 1.80 0.1653 4.30 0.0136 6.80 0.0011 1.90 0.1496 4.40 0.0123 6.90 0.0010 2.00 0.1353 4.50 0.0111 7.00 0.0009 2.10 0.1255 4.60 0.0101 2.20 0.1108 4.70 0.0091 2.30 0.1003 4.80 0.0082 2.40 0.0907 4.90 0.0074 2.50 0.0821 5.00 0.0067 Page 4S-5 EXAMPLE 4S-2 By means of extensive testing and data collection, a manufacturer has determined that a particular model of its vacuum cleaners has an expected life that is exponential with a mean of four years and insignificant burn-in phase. Find the probability that one of these vacuum cleaners will have a life that ends: a. After the initial four years of service. b. Before four years of service are completed. c. Not before six years of service. SOLUTION MTTF = 4years a. T = 4years: 4 years T /MTTF = = 1.00 4 years From Table 4S-1, e −1.00 = 0.3679. b. The probability of failure before T = 4years is 1– e −1.00 , or 1– 0.3679 = 0.6321. c. T = 6years: 6 years T /MTTF = = 1.50 4 years From Table 4S-1, e −1.50 = 0.2231. Mechanical items such as ball bearings, valves, and springs tend to have insignificant burn-in and steady-state phases, and start to wear out right away. Item failure due to wear-out can sometimes be modelled by a Normal distribution. Obtaining Normal probabilities involves the use of the standard Normal table (see Appendix B, Table B). The table provides areas under a Normal curve up to a specified point z, where z is a standardized value calculated using the formula: T − Mean wear-out time z = Standard deviation of wear-out time This area is the probability that service life will not exceed some value T. To find the reliability, subtract this probability from 1. See FIGURE 4S-4 A Normal curve. Figure 4S-4. Page 4S-6 To obtain the value of T that will provide a given probability, work in reverse: Locate the nearest probability in Appendix B, Table B, and pick up the associated z value. Then, insert the z value in the above formula and solve for T. Example 4S-3 The mean life of a certain ball bearing can be modelled using a Normal distribution with a mean of six years and a standard deviation of one year. Determine each of the following: a. The probability that a ball bearing will fail before seven years of service. b. The probability that a ball bearing will fail after seven years of service (i.e., find its reliability). c. The service life that will provide a failure probability of 10 percent. SOLUTION Wear-out mean = 6 years Wear-out standard deviation = 1 year Wear-out is Normally distributed a. Calculate z using the above formula: 7 − 6 z = = +1.00 1 Use the calculated z to obtain the required probability from Thus, Appendix B, Table B. P (T < 7) = P (z < 1) = 0.8413 (see the graph). b. Subtract the probability determined in part a from 1.00 (see the graph below). 1.00 − 0.8413 = 0.1587 c. Use the standard Normal table in reverse: Find the value of z that corresponds to an area under the curve (starting from the left side) of 0.10. Thus, z = −1.28 from Appendix B, Table B. Now, insert this in the z formula above: T − 6 z = 1.28 = 1 Solving for T, we find T = 4.72 years (see the graph above). A more general distribution than exponential is the Weibull distribution. The probability density function of a Weibull random variable x is: ⎧ k f (x; λ, k) = ⎨ λ ⎩ 0 ( x k−1 ) e −(x/λ) k x ≥ 0, λ x > 0, where k > 0 is the shape parameter, λ > 0 is the scale parameter of the distribution, and x represents time t. If k = 1, the failure rate is constant over time, and Weibull is identical to the exponential distribution. If k < 1, failure rate decreases over time, and if k > 1, failure rate increases over time. Because of its flexibility, Weibull distribution is commonly used to model the time to failure during the burn-in (k < 1) and wear-out (k > 1) phases. Please note that the probability rules of Section 2 above for series and parallel systems can also be used to determine reliability of a system for a given length of time based on the reliability of its components over the same length of time. Page 4S-7 Availability For repairable items, the measure of importance to customers, and hence to designers, is availability. It measures the fraction of time a piece of equipment or a repairable product is expected to be available for operation (as opposed to being down for repair). Availability can range from zero (never available) to 1.00 (always available). Companies that can offer equipment with high availability have a competitive advantage over companies that offer equipment with lower availability. Availability is a function of both the mean time between failures and the mean time to repair (MTTR) (the average length of time to repair a failed item). We assume that there is little delay before a failed item begins to be repaired. The availability factor can be calculated using the following formula: MTBF Availability = MTBF + MTTR where MTBF = Mean time between f ailures MTTR = Mean time to repair EXAMPLE 4S-4 A copier is expected to operate for 200 hours after repair, and the mean repair time is expected to be two hours. Determine the availability of the copier. MTBF = 200 hours, and MTTR = 2 hours Availability = MTBF/(MTBF + MTTR)= 200/(200 + 2)= 0.990099 Two implications for design are revealed by the availability formula. One is that availability increases as the mean time between failures increases. The other is that availability also increases as the mean repair time decreases. It would seem obvious that designers would want to design products that have a long time between failures. However, some design options enhance repairability, which can be incorporated into the product. Ink-jet printers, for example, are designed with print cartridges that can easily be replaced. To increase availability, designers increase MTBF but also decrease MTTR. Laser printers, for example, are designed with print cartridges that can be easily replaced, thus requiring a small MTTR. SUMMARY Reliability is a measure of the ability of a product or a part to perform its intended function under a prescribed set of conditions. Reliability of a product or a part is used in two ways: reliability when activated and reliability for a given length of time. If the reliability is inadequate, the types of failure and their effect on the product should be determined, their root cause(s) identified, and potential failure prevented. Reliability measurement involves statistics and probability theory. The inverse of failure rate per hour is mean time to failure (MTTF), the average length of time (in hours) before failure. KEY TERMS availability mean time between failures (MTBF) mean time to failure (MTTF) mean time to repair (MTTR) reliability SOLVED PROBLEMS Page 4S-8 Problem 1 A weather satellite has expected life of 10 years from the time it is placed into Earth’s orbit. Determine its reliability for each of the following lengths of service (assume that exponential distribution is appropriate.) a. 5 years b. 12 years c. 20 years d. 30 years Solution MTTF = 10 years Calculate the ratio T/MTTF for T = 5, 12, 20, and 30, and obtain the values of e−T/MTTF from Table 4S-1. These are the solutions (= reliabilities). T MTTF T/MTTF e−T/MTTF a. 5 10 0.50 0.6065 b. 12 10 1.20 0.3012 c. 20 10 2.00 0.1353 d. 30 10 3.00 0.0498 Problem 2 What is the probability that the satellite described in and 12 years after being placed into Earth’s orbit? Solution Solved Problem 1 will fail between 5 P (5 years < f ailure < 12 years) = P (f ailure af ter 5 years) -P (f ailure af ter 12 years) Using the probabilities shown in the previous solution we obtain: P (5 years < f ailure < 12 years) =P (f ailure af ter 5 years) −P (f ailure af ter 12 years) = 0.6065 − See the following chart: Page 4S-9 Problem 3 One line of specialty tires has a wear-out life that can be modelled using Normal distribution with a mean of 25,000 km and a standard deviation of 2,000 km. Determine each of the following: a. The percentage of tires that can be expected to wear out within ±2,000 km of the average (i.e., between 23,000 km and 27,000 km). b. The percentage of tires that can be expected to fail between 26,000 km and 29,000 km. c. For what tire life would you expect 4 percent of the tires to have worn out? Solution Note: Kilometres are analogous to time and are handled in exactly the same way. a. The phrase “within ±2,000 km of the average” translates to within one standard deviation of the mean because the standard deviation equals 2,000 km. Therefore, the range of z is z = −1.00 to z = +1.00, and the area under the curve between those points is found as the difference between P (z < +1.00) and P (z < −1.00), using values obtained from Appendix B, Table B. P (z< +1.00) = 0.8413 −P (z< −1.00) = 0.1587 , which means 68.26 percent of tires will wear out between 23,000 km and 27,000 km (see the following chart): P (−1.00 < z < +1.00) = 0.6826 b. Wear-out mean = 25,000 km Wear-out standard deviation = 2,000 km P (26,000 < Wear-out < 29,000) =P (z<z 29,000 ) −P (z<z 26,000 ) 29,000 − 25,000 z 29,000 = z 26,000 = = +2.00 → 0.9772(f rom App = +0.50 → 0.6915(f rom App 2,000 26,000 − 25,000 2,000 The difference is 0.9772 − 0.6915 = 0.2857, which means 28.57 percent of tires will wear out between 26,000 km and 29,000 km (see the following chart). c. Use Appendix B, Table B to find z for 4 percent: z = −1.75. Find tire life using . μ + zσ:25,000 − 1.75 (2,000) = 21,500km DISCUSSION AND REVIEW QUESTIONS 1. How is failure rate per hour calculated? MTTF? Give an example of both. Page 4S-10 LO1 2. What is the significance of the bathtub curve in reliability? Give an example of an item with a failure rate in each phase. LO1 3. How is reliability determined if the distribution of time to failure is exponential? 4. What is availability and how can it be increased? LO1 LO1 PROBLEMS 1. An electronic chess game has a useful life that is exponential with a mean of 30 months. Determine each of the following: Page 4S-11 LO1 a. The probability that any given unit will operate for at least (1) 39 months, (2) Page 4S-12 48 months, (3) 60 months. b. The probability that any given unit will fail sooner than (1) 33 months, (2) 15 months, (3) 6 months. c. The length of service time after which the percentage of failed units will approximately equal (1) 50 percent, (2) 85 percent, (3) 95 percent, (4) 99 percent. 2. A manufacturer of programmable calculators is attempting to determine a reasonable free- service period for a model it will introduce shortly. The manager of product testing has indicated that the calculators have an expected life of 30 months. Assume product life can be described by an exponential distribution. LO1 a. If service contracts are offered for the expected life of the calculator, what percentage of those sold would be expected to fail during the service period? b. What service period would result in a failure rate of approximately 10 percent? 3. Lucky Lumen light bulbs have an expected life that is exponentially distributed with a mean of 20,000 hours. Determine the probability that one of these light bulbs will last: LO1 a. At least 24,000 hours. b. No longer than 4,000 hours. c. Between 4,000 hours and 24,000 hours. 4. According to its designers, a satellite will have an expected life of six years. Assume that exponential distribution applies. Determine the probability that it will function for each of the following time periods: LO1 a. More than 9 years. b. Less than 12 years. c. More than 9 years but less than 12 years. d. At least 21 years. 5. An office manager has received a report from a consultant on equipment replacement. The report indicates that the scanners have a service life that is Normally distributed with mean of 41 months and standard deviation of four months. On the basis of this information, determine the percentage of scanners that can be expected to fail in the following time periods: LO1 a. Before 38 months of service. b. Between 40 and 45 months of service. c. Within two months of the mean life. 6. A major television manufacturer has determined that its 50-inch LED televisions have a mean service life that can be modelled by a normal distribution with a mean of six years and a standard deviation of one-half year. LO1 a. What probability can you assign to service lives of at least (1) five years? (2) Six years? (3) Seven and one-half years? b. If the manufacturer offers service contracts of four years on these televisions, what percentage can be expected to fail from wear-out during the service period? c. What service period would achieve an expected wear-out rate of (1) 2 percent? (2) 5 percent? 7. A soon-to-be-introduced cellphone has an expected service life that can be modelled by a normal distribution with a mean of five years and a standard deviation of 0.6 year. LO1 a. If the company offers a warranty of four years, what percentage of cell phones can be expected to fail before that time? b. What probability can you assign to a service life of (1) 5.9 years? (2) 6.2 years? 8. Determine the availability for each of these cases: LO1 a. MTBF = 40 days, MTTR = 53 days b. MTBF = 300 hours, MTTR = 6 hours 9. A machine can operate for an average of 10 weeks before it needs to be overhauled, a process which takes two days. The machine is operated five days a week. Compute the availability of this machine. (Hint: All times must be in the same units.) LO1 10. A manager must decide between two machines. The manager will take into account each machine’s operating costs and initial costs, and its breakdown and repair times. Machine A has a projected average operating time of 142 hours and a projected average repair time of 7 hours. Projected times for machine B are an average operating time of 65 hours and a repair time of 2 hours. What are the projected availabilities of each machine? LO1 11. A designer estimates that she can (1) increase the average time to failure of a product by 5 percent at a cost of $450, or (2) reduce the average repair time by 10 percent at a cost of $200. Which option would be more cost-effective? Currently, the average time to failure is 100 hours and the average repair time is four hours. LO1 12. Auto batteries have an average life of 2.7 years. Battery life is normally distributed with a mean of 2.7 years and a standard deviation of .3 year. The batteries are warranted to operate for a minimum of 2 years. If a battery fails within the warranty period, it will be replaced with a new battery at no charge. The company sells and installs the batteries. Also, the usual $5 installation charge will be waived. LO1 a. What percentage of batteries would you expect to fail before the warranty period expires? b. The manager of this company is toying with the idea of using the same battery with a different exterior, labelling it as a premium battery, and offering a 30-month warranty on it. This would match a competitor’s warranty period for their premium battery. What percentage of the “premium” batteries would you expect to fail before the warranty period expires?” c. Other than the price of the replacement batteries, what other factors should the manager consider before embarking on the plan outlined in part (b) above?” 13. The MTTF of the central processing unit (CPU) of a single board computer is estimated to be 150,000 hours. You can assume exponential distribution for operating time of this component until failure. What is the probability that this component will operate without failure for: LO1 a. 2.5 years? b. 5 years? c. 10 years? (Hint: Use a calculator, instead of Table 4S-1, to obtain more accurate probabilities.) 14. A study was performed to determine the reliability of components of personal computers (PCs) used by Rolls-Royce staff.1The operating lives of the components of 341 PCs were measured over a 22-month period. The study fit the Weibull distribution to the sample ⎪ operating lives of each component and, based on the estimated parameters k (shape) and LO1 ? (scale), calculated its average life or MTTF. ⎧ k f (x; ?, k) = ⎨ ? ⎩ 0 k−1 x ( ) e −(x/?) k x = 0, ? x < 0. In the above formula, x represents time. The mean of the Weibull distribution is ?G(1 + 1/k) where G(y) can be computed in Excel using “=EXP(GAMMALN(y))”. While some components had a larger failure rate at the beginning of their life (e.g., hard disks with k = 0.51), others had almost constant failure rate over time (e.g., motherboards with k = 0.99). a. For motherboards, k = 0.99 and ? = 49,171. Estimate the average life of a motherboard. b. Suppose 90 motherboards (out of 341) failed during the study period (22 months), and their lives added to 540,000 hours. Estimate the average life of a motherboard (in hours) directly (i.e., not using Weibull distribution). 15. A computer has two independent and identical central processing units (CPUs) that are both used when the computer is on. Suppose that the failure rate of a CPU is 0.0001 failures per hour (with time to failure being exponential), and the computer will operate if at least one CPU operates. Calculate the mean time to CPU failure of the computer. (Hint: It can be shown that MTTF p = 1 m 1 ? ? i=1 i where ? is the failure rate of one CPU and m is the number of parallel CPUs (in this case ).) m = 2 16. A standby system consists of two independent and identical units. When the first unit fails, the second unit (standby) kicks in. Note that unlike the parallel system of the previous problem, the standby component is brought into operation only when needed. A unit’s failure rate is 0.0001 failures per hour (with time to failure being exponential). Calculate the system mean time to failure (i.e., both units failing). (Hint: It can be shown that m MTTF = ? where ? is the failure rate of a unit and m is the number of units (in this case m = 2).) 17. The following data show the time to failure of 100 units of a generator that were run until failure.2 LO1 a. Compute the failure rate during each month as a proportion of numbers that survived until the beginning of that month. Draw these failure rates against months. Determine if the failure rate is decreasing, constant, or increasing. b. If we assume that failure rate is constant, determine the average failure rate (per month) and MTTF (in months). Month 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 No. failed 1 0 2 1 4 10 18 22 14 8 10 5 3 1 0 1 18. Five units of an electronic component were subjected to stress testing until they failed.3 The observed failure times (in days) were 550, 680, 820, 910, and 1,110. Calculate the MTTF and the failure rate for this component. LO1 19. Twenty units of a component with constant failure rate were subjected to high-stress testing. After 25 hours, seven failed at times (in hours) 2.1, 8.3, 10.9, 15.2, 16.3, 20.5, LO1 23.8.4 Calculate the MTTF and the failure rate for this component. 20. The following data shows the number of failures of 1,000 units of an electronic component in time intervals of 100 hours.5 LO1 a. Compute the failure rate during each time interval as a proportion of numbers that survived until the beginning of that interval. What can you conclude about the failure rates? b. Calculate the MTTF for this component. Time Interval No. of Failures 0-100 95 100-200 86 200-300 78 Time Interval No. of Failures 300-400 70 400-500 64 500-600 58 600-700 52 700-800 47 800-900 42 900-1000 39 21. A piece of equipment contains 300 integrated circuits, 25 amplifiers, 150 transistors, 500 resistors, and 450 capacitors.6 Failure of any component causes a system failure. Using the estimated failure (hazard) rates below, calculate the failure (hazard) rate of the equipment. LO1 Hazard Rate (failures per Component billion hours) Integrated 10 circuit Amplifier 30 Transistor 20 Resistor 1 Capacitor 1 MINI-CASES Mini-Case Engineer TankA Engineer tank is an armoured vehicle used on the battlefield to perform engineering tasks such as opening routes, digging, and bulldozing. During design, the mean time between the need for unscheduled maintenance (other than loss of propulsion) was set to 420 hours. (The target for MTBF for loss of propulsion is 3,500 hours.) During reliability testing for 70 engineer tanks, the need for unscheduled maintenance arose after the following numbers of hours: No. Failed hr No. Failed hr No. Failed hr No. Failed hr No. Failed hr No. 1 9 11 52 21 105 31 178 41 232 51 2 18 12 64 22 114 32 194 42 232 52 3 22 13 68 23 122 33 195 43 239 53 4 23 14 75 24 126 34 198 44 241 54 5 27 15 88 25 126 35 202 45 244 55 6 33 16 89 26 130 36 210 46 247 56 7 36 17 91 27 151 37 215 47 247 57 8 42 18 94 28 153 38 216 48 252 58 9 46 19 95 29 165 39 223 49 273 59 10 50 20 99 30 168 40 223 50 275 60 F Questions 1. Make a histogram of these times. Does the distribution look exponential? 2. Compute the mean. Is the target MTBF met? Page 4S-13 Mini-Case Should You Buy an Extended Warranty?B By Lisa Spencer From cars to computers to kitchen appliances, consumers are bombarded with offers for extended warranties. Are they worth the investment? According to Consumer Reports, the answer is usually “No.” Then why do people buy them? Some buy for the peace of mind of knowing that if something goes wrong during the warranty period, they are covered and won’t experience additional out-of-pocket costs. Others don’t want to worry about figuring out where to take the product for a repair, or they like knowing that it will be replaced if it can’t be fixed. Still others recall events in the past when they did not have an extended warranty and wished they did. What factors do people weigh when making the decision to buy or not to buy? Reasons include: The cost of the item itself. If it’s a big ticket item and expensive to replace, the extended warranty becomes more attractive. A car, for instance, may seem more important to protect than an inexpensive printer. Past history with a similar product or the particular brand being purchased. If a person had good luck in the past with a certain brand, they may figure the warranty is unnecessary. Conversely, a bad experience with the product type or brand may make someone more likely to buy the warranty (or perhaps simply choose a different brand!). Who will be using the product or how heavily it will be used. If the product will be used by children versus adults, or if a person tends to be rough on things, the warranty may seem more worthwhile. The reputation of the warranty company. If a company has a good customer service record, customers may be more likely to buy the warranty. Apple Care, for instance, tends to be highly rated and is often purchased. What the warranty will cover. Some warranties are very extensive, while others are limited by a lot of fine print. Warranties that offer a lot of protection may entice someone to purchase. Conversely, policies that have many coverage limitations or require routine maintenance to avoid nullifying the warranty may seem less desirable. The length of the regular warranty. If the customer feels that the regular warranty is generous, or if the product type tends to have a long life, the extended warranty may seem less important. How long the user plans to keep the product and how long the product life cycle is. If a user plans to keep the product, for instance a phone, for a short period of time, the normal warranty may already be long enough. Similarly, if the technology of the product becomes quickly obsolete, the customer may prefer upgrading to a newer model over opting for a repair. Is the extended warranty a “good buy”? Extended warranties can be expensive, and some experts suggest the consumer is better off putting the cost of the warranty into a savings account where it is available if needed. Additionally, many credit card companies offer extended warranty protection if the purchase is made on that account, which is a simple and free way to avoid paying for extra coverage for some types of products. The odds of actually needing the warranty are slim; thus, they are huge money makers for the companies that sell them. This is mainly because the extended warranty covers the product during its normal useful life, when most of the products should still be functioning properly. Dave Ramsey, a personal finance guru and popular public speaker states, “Extended warranties are a really horrible set of mathematics, and the reason people sell them is because they make a bundle on them in commissions.” Many appliances, for instance, last so long that the extended warranty will expire long before they will. The typical refrigerator lasts 14 to 27 years, and even a microwave oven can last seven to nine years. “Most of the things we buy today are reliable: They come with warranties that protect us and last the amount of time we expect them to,” explains Richard M. Alderman, head of the Consumer Law Center of the University of Houston. Of course, if a person happens to get one of the few products that does fail during the time of the extended warranty, having an extended warranty would be a good thing. However, most extended warranty purchasers will not need the service, similar to how most people who purchase term life insurance do not end up needing the coverage. A Consumer Reports member survey indicated that most car owners spent more on the extended warranty than the value of the services they got back in return. Ultimately, each person has to decide for themselves whether the peace of mind and convenience of an extended warranty offer enough value to justify the cost. 1. How do warranties or extended warranties affect a company’s costs and reputation? 2. What strategic considerations should be taken into account when deciding how long a warranty to offer? CHAPTER 5 Strategic Capacity Planning Page 170 Royalty-Free/Corbis LEARNING OBJECTIVES After completing this chapter, you should be able to: LO1 LO2 LO3 Define capacity, explain the importance of long-term capacity, know how to measure capacity, understand two related performance measures, know overall equipment effectiveness, and describe factors influencing effective capacity. Describe the strategic capacity planning process in organizations, know long-term demand patterns and calculate capacity requirements, and discuss major considerations for developing capacity alternatives. Describe the break-even analysis approach for evaluating capacity alternatives, and use it to solve problems. LO4 Describe the implications of capacity decisions in the operations strategy of the firm. Hospitals that not too long ago had what could be described as “facility oversupply” are now experiencing what might be called a “capacity crisis” in some areas. The way hospitals plan for capacity is critical to their future success. The same applies to all sorts of organizations, at all levels of these organizations. Capacity refers to an upper limit or ceiling on the load that an operating unit can handle. The load might be in terms of the number of physical units produced (e.g., bicycles assembled per hour) or the number of services performed (e.g., computers upgraded per hour). The operating unit might be a plant, department, machine, store, or worker. Capacity needs include equipment, space, and employee skills. The goal of strategic capacity planning is to achieve a match between the long-term supply capabilities of an organization and the predicted level of long-term demand. Organizations become involved in capacity planning for various reasons. Among the chief reasons are changes in demand, changes in technology, changes in the environment, and perceived threats or opportunities. A gap between current and desired capacity will result in capacity that is out of balance. Overcapacity (i.e., excess capacity) causes operating costs that are too high, while undercapacity (i.e., not enough capacity to meet demand) causes strained resources and a possible loss of customers. Capacity planning and analysis involves: (1) drawing a process flow diagram (PFD, see Chapter 6) for resources, (2) determining the quantity of resources at each operation, (3) calculating the required overall resource effectiveness (OEE, defined in this chapter) at each operation, (4) estimating the demonstrated OEE at each operation, and finally (5) ensuring that the demonstrated OEE is larger than the required OEE at each operation. 5.1 Capacity, Measures, Efficiency, Utilization, and Effective Capacity Page 171 LO1 Define capacity, explain the importance of long-term capacity, know how to measure capacity, understand two related performance measures, know overall equipment effectiveness, and describe factors influencing effective capacity. Capacity is the upper limit on the workload that an operating unit can handle. An operating unit might be a plant, department, machine, store, or worker. Capacity is usually measured as maximum production rate, throughput, or output rate (e.g., the maximum number of customers who can be served at a particular Service Canada location per day). If output is hard to measure, a major input can be used (e.g., number of seats in an airplane). Capacity decisions have different time frames: long-term, medium-term, or short-term. Long-term usually refers to one to five years into the future. We need to make long-term capacity decisions such as determining the plant size or the number of major machines and equipment. Medium-term usually refers to the next 12 months. Medium-term capacity decisions include determining the nature and level of the workforce, which in turn determines the aggregate operations plan. Short-term relates to the next few days and weeks, usually up to 12 weeks ahead. Short-term capacity decisions include determining the nature and level of staffing and work shifts, which in turn determine the production schedule of products or capacity of service. Outsourcing is also a capacity decision. Outsourcing refers to the practice of delegating the production of a product or delivery of a service to an external company. If production or service delivery is to be outsourced, then there is usually no need to create the capacity in-house. Outsourcing has been increasingly used by many organizations to reduce costs, gain flexibility, and take advantage of suppliers’ expertise (quality). It is also possible to outsource part(s) of a product/service or a segment of a production/service process. For example, many restaurants buy prepared/partially cooked frozen/vacuum-packed food ingredients. For examples of Canadian companies outsourcing parts of their operations to other countries, see the “ Action. OM in ACTION Offshore Outsourcing in Canadian Banks” OM in Offshore Outsourcing in Canadian BanksA Stockbyte/Getty Images In 2017, CIBC eliminated 130 finance jobs from its Toronto finance department and outsourced the work to India. The positions outsourced were mainly accounting-type roles. In an internal staff memo, CIBC’s CEO, Victor Dodig, stated that although outsourcing is not a popular decision, sometimes it is a necessary business decision. He added that the decision was not motivated by cutting jobs or costs, and was rather an effort help the bank adapt to changing business needs by ensuring there is capacity available around the clock to manage peaks in demand. Other Canadian banks have also been in the news in the past for similar decisions to outsource parts of their operations to other countries. In 2013, Royal Bank of Canada faced a tidal wave of criticism following a CBC News report that 45 of its IT employees were being replaced by cheaper workers from India employed by a global outsourcing firm, iGATE. Outsourcing may be the preferred strategy for many companies to achieve lower production cost or even higher quality. But the lack of control and the risks involved with production and service delivery may prove to be too expensive for many companies. Many companies may see their outsourced operations disrupted for different reasons including but not limited to natural disasters (tsunami, earthquake, etc.) or political turmoil (especially in the case of offshore outsourcing). In such cases, companies may decide to step away from outsourcing as a strategy to address capacity challenges. For an example of operations disrupted because of political reasons, see the “ Trade War” OM in Action. Page 172 OM in ACTION Trade WarB Many companies find themselves backtracking on their decisions to outsource operations to China amid the trade war between the United States and China. Nerthuz/Shutterstock The trade war between the United States and China is too costly for many companies who previously outsourced part or all of their operations to China. One of these companies is Canadian toy maker Spin Master, which in 2019 decided to diversify production out of China as a trade dispute between the world’s two largest economies dragged on. According to Benoit Gadbois, then CEO of the Toronto-based company, the company had already started to move production away from China in 2015 due to rising production costs in China, where at the time, close to 90 percent of Spin Master’s production took place. By 2019, the company had already reduced its share of the production in China to 65 percent and planned to reduce it even further. Strategic capacity planning is often used to achieve a match between the long-term supply capabilities of an organization and the predicted level of long-term demand. Organizations become involved in capacity planning for various reasons. Among the chief reasons are changes in demand, changes in technology, changes in the environment, and perceived threats or opportunities. A gap between current and desired capacity will result in capacity that is out of balance. Overcapacity causes operating costs that are too high, while undercapacity causes strained resources and possible loss of customers. The key questions in capacity planning are the following: 1. What kind of capacity is needed? 2. How much is needed to match demand? 3. When is it needed? The question of what kind of capacity is needed depends on the products and services that management intends to produce or provide. Hence, in a very real sense, capacity planning is governed by those choices. Forecasts are key inputs used to answer the questions of how much capacity is needed and when. Because of uncertainties, some organizations prefer to delay capacity investment until demand materializes. However, such strategies often inhibit growth because adding capacity takes time and customers won’t usually wait. Conversely, organizations that add capacity in anticipation of growth often discover that the new capacity actually attracts growth. Some organizations “hedge their bets” by making a series of small changes and then evaluating the results before committing to the next change. In some instances, capacity choices are made very infrequently; in others, they are made regularly, as part of an ongoing process. Generally, the factors that influence this frequency are the stability of demand, the rate of technological change in equipment and product design, and competitive factors. Other factors relate to the type of product or service provided and whether style changes are important (e.g., automobiles and clothing). In any case, management must review product and service choices periodically to ensure that the company makes capacity changes when they are needed for cost, competitive effectiveness, or other reasons. In this chapter, we study mainly long-term capacity planning, while deferring medium-term capacity decisions to Chapter 12 and short-term capacity decisions to Page 173 Chapter 16 and Chapter 18. Note that many long-term capacity decisions may have a location dimension. For example, suppose management at a long-term care facility realizes it needs to increase the number of beds. It can expand its current facility, open up another facility somewhere else to supplement the current facility, or close the current facility and open up a larger facility somewhere else. Note that services should be located close to their customers because location convenience is part of the service. Location decisions are covered in Chapter 8. The Importance of Long-Term Capacity For a number of reasons, long-term capacity decisions are among the most fundamental of all design decisions that managers must make. 1. Capacity has a real impact on the ability of the organization to meet future demand for products; capacity essentially limits the rate of output (throughput) possible. Having capacity to satisfy demand allows a company to exploit opportunities. When Microsoft introduced its new Xbox, there was insufficient supply, resulting in lost sales and unhappy customers. And shortages of flu vaccine in some years due to production problems have affected capacity, limiting the availability of the vaccine. 2. Capacity affects operating costs. Ideally, capacity and demand requirements should be matched. In practice, this is not always achieved because actual demand differs from expected demand or tends to vary (e.g., cyclically). In such cases, organizations may incur additional operating costs due to overand undercapacity. 3. Capacity is usually a major determinant of initial capital cost. Typically, the greater the capacity of a productive unit, the greater is its capital cost. 4. Capacity involves long-term commitment of resources, and once they are committed, it may be difficult to modify them without incurring major costs. 5. Capacity can affect competitiveness. If a company has excess capacity, or can quickly add capacity, that fact may serve as a competitive advantage. For example, capacity can affect delivery speed, which can be a competitive advantage in many businesses. 6. Capacity affects ease of management; having appropriate capacity makes management easier than when capacity is mismatched. 7. Globalization has increased the importance and the complexity of capacity decisions. Far-flung supply chains and distant markets add to the uncertainty about capacity needs. 8. Because capacity decisions often involve substantial financial and other resources, it is necessary to plan for them far in advance. For example, it may take years for a new crude oil refinery to be constructed and become operational. This increases the risk that the designated amount of capacity will not match actual demand when the capacity becomes available. For an example of long-term capacity decisions, see the Levels” OM in Action. “Canadian Refineries and Their Capacity OM in ACTION Canadian Refineries and Their Capacity LevelsC Boilers are one of the most important parts of refineries that help the system run properly. Design Pics Canada has a total of 18 refineries (of various types) in operation. These facilities refine oil into components that can be used by manufacturers in different industries to produce products such as plastics, cosmetics, textiles, electronics, medical supplies, and so on. The number of refineries in each Canadian province along with the overall production capacity of each province (measured in barrels per day, bbl/day) are listed in the table below. Province Number of refineries Overall Capacity (bbl/day) Newfoundland and Labrador 1 130,000 New Brunswick 1 300,000 Quebec 2 372,000 Ontario 5 408,600 Saskatchewan 2 157,000 Alberta 5 560,000 British Columbia 2 67,000 Due to various constraints and requirements, such as demand, throughput may not be equal to capacity. The graph below shows the throughput of Canadian refineries (measured in thousand bbl/day). Source: “Canadian Refineries,” Oil Sands Magazine, Jan. 2023. Number of refineries and their capacity levels have undergone major changes over the years. Due to many reasons (e.g., demand loss, fluctuating prices), some refineries had to close. In other cases, some refineries were consolidated to achieve better efficiency. Canada used to have many small refineries. Nowadays, we have a smaller number of larger refineries. It is important to note that despite the decline in the total number of refineries, the overall average capacity per refinery has actually increased in Canada. In addition to that, the overall refinery capacity in Canada has not shown any major decline in recent years. The graph below shows the total number of refineries in Canada (right axis) and the overall capacity of refineries in the country (left axis). While the number of refineries has consistently declined, the overall capacity has only increased. Total number of refineries (right axis - blue line) and total refinery capacity in thousand bbl/day (left axis - bars) Measuring Capacity and Some Related Performance Measures Capacity often refers to an upper limit on the rate of output. Even though this seems simple enough, there are subtle difficulties in actually measuring capacity in certain cases. These difficulties arise because of different interpretations of the term capacity and problems with identifying suitable measures for a specific situation. In selecting a measure of capacity, it is better to choose one that does not require updating. Dollar amounts are often a poor measure of capacity (e.g., capacity of $15 million of sales a year) because price changes over time necessitate updating of that measure. Where only one product is involved, the capacity of the productive unit is expressed in terms of that item. However, when multiple products are involved, as is often the case, using a simple measure of capacity based on units of output can be misleading. For example, an appliance manufacturer may produce a combination of refrigerators and freezers. If the output rates for these two products are different, it would not make sense to simply state capacity in units without reference to either refrigerators or freezers. One possible solution is to state capacities in terms of each product. Thus, the company may be able to produce 100 refrigerators per day or 80 freezers per day. Sometimes this approach is helpful, sometimes not. For instance, if an organization has many different products, it may not be practical to list all of the relevant capacities. A better way is to choose a major product, and represent each other product in equivalent units of the major product (more on this in Chapter 12). Alternatively, one can use the availability of a major input as capacity. Thus, a hospital has a certain number of beds, a production facility has a certain number of labour hours available per week, a delivery service has a certain number of drivers per day, and a bus has a certain number of seats. No single measure of capacity will be appropriate in every situation. Rather, the measure of capacity must be tailored to the situation. used measures of capacity. Page 174 Table 5-1 provides some examples of commonly Page 175 TABLE 5-1 Some examples of commonly used measures of capacity Business Inputs Outputs Auto Labour hours, machine hours Number of cars per shift Floor space, sales per square Revenue generated per day manufacturing Retailer foot Restaurant Number of tables, number of Number of meals served per day seats Theatre Number of seats Number of tickets sold per day, number of shows staged per month Steel mill Furnace size Tonnes of steel per day Oil refinery Barrels of crude oil used per Barrels of gasoline produced per day day Farming Number of acres Bushels of grain per acre per year, litres of milk per day Up to this point, we have been using a general definition of capacity. Although it is functional, it can be refined into two useful definitions of capacity: 1. Design capacity: The maximum output rate or service capacity an operation, process, or facility is designed for. The maximum output rate under ideal conditions. 2. Effective capacity: The maximum output rate that can be sustained given work breaks, scheduling difficulties and expected delays, machine/equipment maintenance, etc. (also known as standard output rate). Effective capacity is always less than design capacity owing to realities of changing product Page 176 mix, periodic maintenance of machines/equipment, lunch and coffee breaks, problems in scheduling and balancing operations, and similar circumstances. Actual output rate cannot exceed effective capacity and is often less because of operational issues such as machine/equipment breakdowns, absenteeism, shortages of materials, and quality problems, as well as other factors that are outside the control of the operations manager. These different measures of capacity are useful in defining two measures of system effectiveness: efficiency and utilization. Efficiency is the ratio of actual output rate to effective capacity. Capacity ut ilization is the ratio of actual output to design capacity. (5-1) Actual output rate Ef f iciency = ×100% Ef f ective capacity Actual output rate Capacity utilization = ×100% (5-2) Design capacity Both measures are expressed as percentages. It is not unusual for managers to focus exclusively on efficiency, but in many instances this emphasis can be misleading. This happens when effective capacity is low compared to design capacity. In those cases, high efficiency would seem to indicate effective use of resources when it does not. The following example illustrates this point. EXAMPLE 5-1 3M produces silica to be used in different applications such as the production of closetolerance components for aerospace, automotive, construction, energy, and many other industries. To process silica, eight furnaces are used. Each furnace has 2,200 pounds/hour capacity. The company operates 24 hours a day, five days a week. During a typical week, the actual number of operating hours is smaller due to preventive maintenance and other forms of downtime. Effective capacity rate for this operation is 1,700,000 pounds per week and actual production rate is 1,600,000 pounds of silica per week. Calculate the efficiency as well as the capacity utilization of the silica furnaces. SOLUTION Available furnace hours per week = 8(24)(5) = 960 hours per week Total design capacity per week = 2,200(960) = 2,112,000 pounds per week Efficiency = Actual output rate/Effective capacity = (1,600,000/1,700,000) × 100% = 94% Capacity utilization = Actual output rate/Design capacity = (1,600,000/2,112,000) × 100% = 75.8% Compared to the effective capacity of 1,700,000 pounds per week, 1,600,000 pounds per week looks pretty good. However, compared to the design capacity of 2,112,000 pounds per week, 1,600,000 pounds per week is much less impressive although probably more meaningful. Because effective capacity acts as a lid on actual output, the real key to improving capacity utilization is to increase effective capacity by correcting quality problems, maintaining equipment in good operating condition, fully training employees, and fully utilizing bottleneck equipment. Hence, increasing utilization depends on being able to increase effective capacity, and this requires a knowledge of what is constraining effective capacity. For an example on capacity measure and utilization used by airlines, see the Utilization and the COVID-19 Pandemic” OM in Action. “Airline Capacity OM in ACTION Airline Capacity Utilization and the COVID-19 PandemicD REUTERS/Alamy Stock Photo Fly View Productions/E+/Getty Images The airline industry was one of the hardest hit by the global COVID-19 pandemic. Airlines from around the world suffered a huge decline in demand. Many airlines stopped expansion plans and grounded aircraft as demand evaporated within weeks. The effect was lower capacity and utilization across all lines of operations. Capacity in the airline industry is measured using different calculations. One of the most commonly used measures is available seat miles (the sum over all planes of the number of their seats multiplied by the number of miles each normally flies per year). Capacity utilization can be measured by passenger load factor, which is the average percentage of seats occupied. The available capacity and capacity utilization of Air Canada aircrafts were heavily impacted by the pandemic. The available seat miles offered by Air Canada between 2018 and 2021 are listed below: 2018: 110.9 billion seat miles 2019: 112.8 billion seat miles 2020: 37.7 billion seat miles 2021: 33.4 billion seat miles The low capacity volumes in 2020 and 2021 were mainly caused by a sharp decline in air travel and the reduced number of aircrafts in operation, both due to the pandemic. Not only did the available capacity decline, but the utilization rate of the capacity also dipped significantly during the pandemic. The passenger load factor values of Air Canada’s fleet between 2018 and 2021 are listed below: 2018: 83.3% 2019: 83.4% 2020: 61.6% 2021: 63.0% A related measure is revenue passenger miles, which represents the amount of total passenger miles that produced revenue for the company. This measure is calculated by multiplying available seat miles by passenger load factor. The revenue passenger miles for Air Canada between 2018 and 2021 are listed below: 2018: 92.4 billion passenger miles 2019: 94.0 billion passenger miles 2020: 23.2 billion passenger miles 2021: 21.0 billion passenger miles The revenue generated by Air Canada in 2019 was $14.417 billion, up 3.44 percent from its 2018 revenue. However, in 2020 the company generated revenue of just $4.354 billion (a 69.8 percent decline from the previous year). The company’s revenue in 2021 showed 17.28 percent growth, generating $5.107 billion. Factors Influencing Effective Capacity Many aspects of design have an impact on effective capacity. The same is true for many planning and operating decisions. Facilities and Machines The design of facilities, including size and layout, directly influences effective capacity. Layout of the work area often determines how smoothly work can be performed, and environmental factors such as heating, cooling, lighting, and ventilation also play a significant role. Further, machine and equipment speed and their state directly influence capacity, which means their maintenance is important. Page 177 Product Mix When items are similar, the ability of the system to produce those items is much greater than when successive items differ. There is less need for product change-over and machine/equipment setup. Thus, a restaurant that offers a limited menu can usually prepare and serve meals at a faster rate than a restaurant with an extensive and highly customized menu. The more uniform the output, the more opportunities there are for standardization of machines, methods, and materials, which leads to greater effective capacity. Page 178 Workers The tasks that make up a job, the variety of activities involved, and the training, skill, and experience required to perform a job all have an impact on the potential output. In addition, employee motivation has a very basic relationship to effective capacity, as do absenteeism and labour turnover. Planning and Operational Factors Scheduling problems may occur when there are differences in equipment capabilities or differences in job requirements. Effective capacity may be constrained by a bottleneck operation, inventory decisions, late deliveries from suppliers, acceptability of purchased materials and parts, and quality control procedures. Supply Chain Factors Supply chain factors must be taken into account in capacity planning if substantial capacity changes are involved. Key questions include: What impact will the changes have on suppliers, warehousing, transportation, and distributors? If capacity will be increased, will these elements of the supply chain be able to handle the increase? Conversely, if capacity is to be decreased, what impact will the loss of business have on these elements of the supply chain? External Factors Product standards, especially minimum quality and performance standards, can restrict management’s options for increasing effective capacity. Also, pollution standards on products and equipment often reduce effective capacity, as does paperwork required by government regulatory agencies. A similar effect occurs when a union contract limits the type of work an employee may do. In only 48 hours, Solectron in San Jose, California, can build to order, ship, and install a complex computer system. Suppliers hold inventory until it is pulled, thereby increasing manufacturing flexibility. Kim Steele/Getty Images 5.2 The Strategic Capacity Planning Process in Organizations LO2 Describe the strategic capacity planning process in organizations, know long-term demand patterns and calculate capacity requirements, and discuss major considerations for developing capacity alternatives. Capacity decisions in organizations are usually part of the annual strategic planning process. They directly influence capital budgeting. The steps taken are as follows: 1. Forecast demand for products one to five years, or more, ahead. 2. Calculate capacity requirements to meet the forecasts. 3. Measure existing capacity, and decide if and how to bridge the gap in capacity in the future. a. Generate technically feasible alternatives varying in nature (plant, machines/equipment, subcontract, lease), size, location, price changes, etc. b. Evaluate each alternative economically. i. Initial investment? Annual revenues? Annual operating expenses? Life of investment? ii. Method of evaluation: Break-even analysis, payback period, or net present value. c. Consider non-economic aspects too (e.g., ease of use, reliability, etc.). d. Choose the best alternative and implement it. In the rest of this chapter, we will briefly describe Steps 1 and 2, provide some considerations for performing Step 3a, and describe use of breakeven analysis for Step 3b. Page 179 Forecasting Long-Term Demand Figure 5-1 illustrates some basic long-term demand patterns. In addition to basic patterns, there are more complex patterns, such as a combination of cycles and trends. FIGURE 5-1 Common long-term demand patterns When trends are identified, the fundamental issues are (1) how long the trend might persist and (2) the slope of trend. If a cycle is identified, interest focuses on (1) the approximate length of the cycle, and (2) the amplitude of the cycle (i.e., deviation from average). Short-term capacity needs are less concerned with cycles or trends than with seasonal variations and other deviations from average. These deviations are particularly important because they can place a severe strain on a system’s ability to satisfy demand at some times and yet result in idle capacity at other times. Long-term forecasting techniques include judgmental models and regression. For details, please refer to Chapter 3. The link between marketing and operations is crucial. Through customer contacts and demographic analysis, marketing can supply vital information to operations for ascertaining capacity needs for both the long term and the short term. Calculating Capacity Requirements We will illustrate this by an example for determining the number of machines needed to make some products. Another method of determining capacity requirements in a health care setting is given in the “Long-Term Care Capacity Planning” OM in Action. Page 180 OM in ACTION Long-Term Care Capacity PlanningE Thinkstock/Getty Images As baby boomers approach old age, the percentage of the population over age 65 increases rapidly. This will cause a significant increase in demand for long-term care (LTC) provided by nursing homes. Thus, provincial governments and local health regions, being responsible for provision of health care in Canada, are concerned about LTC capacity issues. The most common measure of demand for LTC is number of beds per 1,000 population aged 65+. In Canada, there are a total of 2,076 LTC homes that offer 24-hour nursing care and have publicly funded or subsidized beds, with a total capacity of 198,220 beds. There are approximately 29 LTC beds per 1,000 population age 65+, with variations across the provinces and territories. The following infographic shows the number of LTC beds per 1,000 seniors age 65+ in different Canadian provinces. The current capacity of LTC beds is not enough to meet the growing demand Canada will face over the next decade. A report released in 2017 by the Canadian Medical Association asserts that in order to meet demand, Canada will need an additional 199,000 LTC beds by 2035, nearly doubling today’s capacity. The report is based on a demographics-driven forecast of demand by projecting long-term care utilization rates by age group and combining them with national and provincial demographic forecasts of the Canadian population. The authors use a cost–benefit analysis and demonstrate that even though these new beds would require approximately $64 billion in capital spending and $130 billion in operating spending between 2018 and 2035 (in 2017 dollars), the investment would have a positive impact on the economy, contributing a total of $235 billion to real GDP and supporting an average of 123,000 jobs per year. These measures are not considering the positive contributions to improved health outcomes for Canadians. “Now is the time for decision-makers and other key stakeholders to begin addressing the future needs of the population,” the report concludes. EXAMPLE 5-2 A department works one eight-hour shift, 250 days a year. Three new products with the following annual demands are to be produced in the department. There is no excess capacity, so the department needs to buy new machines. Fortunately, there is a type of machine that can produce all three products. The expected processing times per unit are also given below. How many machines are needed? Product Annual Demand Standard Processing Time per Unit (Hr) Processing Time Needed (Hr) 1 400 5.0 2,000 2 300 8.0 2,400 3 700 2.0 1,400 5,800 SOLUTION Working one eight-hour shift, 250 days a year, provides an annual capacity of 8 × 250 = 2, 000 hours per year for each machine. If the total needed processing time for a particular job is available, and we know the processing time capacity of each unit of a machine, we can calculate the number of units of the machine needed to complete the job using the following formula: (5-3) Processingtimeneeded Unitsofcapacityneeded = Processingtimecapacityperunit We can see that three of these machines would be needed to handle the required volume: 5,800 = 2.90 machines (round up to 3) 2,000 hours/machine The size of the facility can be determined by summing the areas required for machines, inventory, handling material, and the offices required. Page 181 Major Considerations for Developing Capacity Alternatives There are a number of ways to enhance development of capacity strategies: 1. Design Flexibility into the System The long-term nature of capacity decisions and the risks inherent in long-term forecasts suggest potential benefits from designing flexible systems. For example, provision for future expansion in the original design of a structure frequently can be obtained at a small price compared to what it would cost to remodel an existing structure that did not have such a provision. Hence, if future expansion of a restaurant seems likely, water lines, power hookups, and waste disposal lines can be put in place initially so that if expansion becomes a reality, modification to the existing structure can be minimized. Similarly, a new golf course may start as a nine-hole operation, but if provision is made for future expansion by obtaining options on adjacent land, it may progress to a larger (18-hole) course. Other considerations in flexible design involve layout of equipment, location, equipment selection, production planning, scheduling, and inventory policies, which will be discussed in later chapters. 2. Take Stage of Life Cycle into Account Capacity requirements are often closely linked to the stage of the life cycle that a product or service is in. At the introduction phase, it can be difficult to determine both the size of the market and the organization’s eventual share of that market. Therefore, organizations should be cautious in making large and/or inflexible capacity investments. In the growth phase, the overall market may experience rapid growth. However, the real issue is the rate at which the organization’s market share grows, which may be more or less than the market rate, depending on the success of the organization’s strategies. Organizations may decide to invest in additional capacity to increase output. However, decision makers should take into account possible similar moves by competitors, which would increase the risk of overcapacity in the market, and result in higher unit costs of the output. Another strategy would be to compete on some nonprice attribute of the product by investing in technology and process improvements to make differentiation a competitive advantage. Page 182 In the maturity phase, the size of the market levels off, and organizations tend to have stable market shares. Organizations may still be able to increase profitability by reducing costs and making full use of capacity. However, some organizations may still try to increase profitability by increasing capacity if they believe this stage will be fairly long, or the cost to increase capacity is relatively small. In the decline phase, an organization is faced with underutilization of capacity due to declining demand. Organizations may eliminate the excess capacity by selling it, or by introducing new products or services. An option that is sometimes used in manufacturing is to transfer capacity to a location that has lower labour costs, which allows the organization to continue to make a profit on the product for a while longer. 3. Take a “Big Picture” (i.e., Systems) Approach to Capacity Changes When developing capacity alternatives, it is important to consider how parts of the system interrelate. Capacity changes inevitably affect an organization’s supply chain. Suppliers may need time to adjust to their capacity, so collaborating with supply chain partners on plans for capacity increases is essential. That includes not only suppliers, but also distributors and transporters. For example, when making a decision to increase the number of rooms in a motel, one should also take into account probable increased demands for parking, entertainment and food, and housekeeping. This is sometimes called capacity balance. Capacity imbalance results in bottlenecks, which restrict the capacity of the whole system. To increase the capacity of the system, the capacity of the bottleneck operation should be increased. A bottleneck operation is an operation in a sequence of operations whose capacity is lower than the capacities of other operations in the sequence. As a consequence, the capacity of the bottleneck operation limits the system capacity; the capacity of the system is reduced to the capacity of Figure 5-2 illustrates this concept: Four operations generate work that the bottleneck operation. must then be processed by a fifth operation. The four different operations each have a capacity of 10 units per hour, for a total capacity of 40 units per hour. However, the fifth operation can only process 30 units per hour. Consequently, the output of the system will only be 30 units per hour. If the other operations operate at capacity, a line of units waiting to be processed by the bottleneck operation will build up at the rate of 10 per hour. Page 183 FIGURE 5-2 Bottleneck operation EXAMPLE 5-3 Mark Sommerfeld/Bloomberg via Getty Images The first product created by the Canadian global toy and entertainment company Spin Master was Earth Buddy, a grass head. Suppose Spin Master was hoping to produce and sell 8,000 Earth Buddies for Mother’s Day and had one week to produce them. The Earth Buddy assembly consisted of the following operations: A: Fill grass seeds and sawdust in a nylon stocking (average time 90 seconds); B: Form ears and nose using elastic bands (average time 48 seconds); C: Stick on the eyeglasses and eyes (average time 24 seconds; eyeglasses were formed off line); and D: Paint the mouth (average time 15 seconds). Finally, Earth Buddies are left to dry overnight and then packed. There are six workers doing A, three doing B, two doing C, and one doing D. There is enough space for inventory between operations so that they can work fairly independently. Determine the bottleneck operation and capacity of the “line” for a 40-hour week. Is the line balanced? Can Spin Master meet its production goal? SOLUTION Fill Form Eyes Paint Time per unit per worker (sec) 90 48 24 15 No. of units per minute per worker 60/90 = 2/3 60/48 = 1.25 60/24 = 2.5 60/15 = 4 Number of workers 6 3 2 1 Capacity per minute 6(2/3) = 4 3(1.25) = 3.75 2(2.5) = 5 4 (1) = 4 Capacity per hour 4 (60) = 240 3.75 (60) = 225 5 (60) = 300 4 (60) = 240 Bottleneck Line capacity = 225 units per hour. Yes, the line is fairly balanced because capacity per hour values for the operations are all pretty close. The bottleneck is identified as the stage with the smallest effective capacity. For this example, it is stage B with the hourly capacity of 225 units. The bottleneck, having the smallest capacity, determines the overall output rate of the process, 225 units/hour. Productive hours required to make 8, 000units = 8, 000/225 = 35.6hours. Yes, Spin Master should be able to meet its target production goal of 8,000 units provided employees work approximately 36 hours (excluding breaks). Page 184 4. Choose Capacity Timing and Increments Consider whether capacity is to be installed before, during, or after demand occurs. If before, it is called leading strategy and if after, lagging strategy (see Figure 5-3). Most organizations plan to have capacity available just before demand occurs because construction of capacity takes a long time. Leading competitors is more risky, but it has greater potential for rewards. If cost of capacity excess and cost of capacity shortage can be estimated, they can be used to make the timing decision. Also, consider whether incremental small expansions or a single big expansion would be more appropriate. Using small expansions is less risky because it allows adjustment of the capacity based on demand changes over time, but it is usually more expensive overall. If goods are involved, any short-term mismatch between capacity and demand can be bridged by carrying inventory. FIGURE 5-3 Leading and lagging capacity strategies 5. Prepare to Deal with Capacity “Chunks” Capacity increases are often acquired in fairly large chunks rather than smooth increments, making it difficult to achieve a match between desired capacity and actual capacity. For instance, the desired capacity of a certain Jazz Aviation (Air Canada Express operator) route may be 75 seats, but aircraft available (Bombardier CRJ 700 NextGen and 900 NextGen) have 70 and 88 seats, respectively. One CRJ 700 would cause capacity to be five seats short of what is needed, but one CRJ 900 would result in an excess capacity of 13 seats. Most airlines would choose the larger aircraft in this case, because cost of shortage (lost profit) is usually larger than cost of excess capacity. This decision becomes more difficult when demand has a trend or cycle. In some instances, capacity choices are made very infrequently; in others, they are made regularly, as part of an ongoing process. Generally, the factors that influence this frequency are the stability of demand, the rate of technological change in equipment and product design, and competitive factors. Other factors relate to the type of product or service and whether style changes are important (e.g., automobiles and clothing). In any case, management must review product and service choices periodically to ensure that the company makes capacity changes when they are needed for cost, competitive effectiveness, or other reasons. Page 185 6. Attempt to Smooth Out Capacity Requirements Unevenness in capacity requirements can create certain problems. For instance, during periods of inclement weather, public transportation ridership tends to increase substantially relative to periods of pleasant weather. Consequently, the system tends to alternate between underutilization and overutilization. Increasing the number of buses or subway cars will reduce the burden during periods of heavy demand, but this will aggravate the problem of overcapacity at other times and certainly add to the cost of operating the system. Again, the best capacity basically depends on expected cost of shortage versus expected cost of excess capacity. If the service is critical, spare capacity should be available or be arranged for peak periods. Another solution in some cases such as electricity generation is demand management—persuading some customers to shift their demand from peak periods to off- peak periods by differential pricing. For another example of demand management through pricing decisions, see the “ Surge Pricing at Uber” OM in Action. OM in ACTION Surge Pricing at UberF Adam Melnyk/Alamy Stock Photo Bad weather, rush hour, and special events could potentially cause unusually large demand for the ride-hailing company Uber. In these instances, the company may increase the price in what is called surge pricing. Whenever prices are raised due to surge pricing, riders using the app at that moment will be notified. Some riders may choose to pay the higher price and use the service, while some other riders will decide to wait a few minutes to see if the prices will go back down. By doing this, Uber tries to smooth out demand (smooth out capacity requirement) in an attempt to minimize the effects of the temporary undercapacity period. Drivers at Uber also have access to a heat map that displays where the most riders are. This encourages the drivers to drive to locations with peak demand. By doing so, Uber tries to increase capacity at areas where there is undercapacity, and decrease capacity at areas where there is overcapacity. The combination of surge pricing and demand information shared with drivers enables Uber to not only manage demand (level out demand), but also balance its capacity across different areas with different capacity requirements. This is a good example of a company using pricing models as well as information sharing mechanisms to manage demand and capacity to reach a balanced system. Seasonal variations are generally easier to cope with than random variations (e.g., due to weather) because they are predictable. One possible solution to seasonal demand is to identify goods or services that have complementary demand patterns and produce them with the same resources. For instance, demand for snow skis and demand for water skis might complement each other: Demand for water skis is greater in the spring and summer months, and demand for snow skis is greater in the fall and winter months. The same might apply to heating and air-conditioning equipment. The ideal case is one in which products or services with complementary demand patterns involve the use of the same resources but at different times, so that overall capacity requirements remain fairly stable and inventory levels are minimized. Figure 5-4 illustrates complementary demand patterns. Page 186 FIGURE 5-4 Products A and B have seasonal but complementary demand patterns. However, the sum of their demands is relatively stable. Capacity requirements could be smoothed out if the same resources can be used to produce both. Capacity requirements are affected by seasonal variations. One approach to smooth out capacity requirements is to identify products with complementary seasonal demand patterns, such as water skis and snow skis. (left): Royalty-Free/Corbis; (right): Royalty-Free/Corbis 7. Use the Capacity Cushion When demand is variable, capacity is usually chosen above the average (forecast) demand. The excess of capacity over the average demand is called capacity cushion or safety capacity. Capacity cushion = Capacity − Average demand The size of capacity cushion again depends on the trade-off between cost of capacity shortage and cost of capacity excess. During the COVID-19 pandemic, governments and health officials around the world used capacity cushions to manage unexpected upticks in demand for vaccines. Chormail/123RF 8. Identify the Optimal Operating Level Production units typically have an ideal or optimal level of operation in terms of average unit cost of output. At the optimal operating level, average cost per unit is the lowest for that production unit; larger or smaller rates of output will result in a higher unit cost (i.e., the average cost curve is “U” shaped). Figure 5-5 illustrates these concepts. FIGURE 5-5 Production units have an optimal rate of output for minimum cost. The explanation for the shape of the cost curve is that, at low levels of output, the investment costs of facility and machines/equipment must be absorbed (paid for) by very few units. Hence, the cost per unit is high. As output is increased, there are more units to absorb the “fixed” cost of facility and machines/equipment, so unit cost decreases. However, beyond a certain point, unit cost will start to rise. Reasons for this include worker fatigue; equipment breakdown; the loss of flexibility, which leaves less of a margin for error; and, generally, greater difficulty in coordinating operations. Both optimal operating level and the amount of the minimum average unit cost tend to be a Page 187 function of size (or capacity) of the operating unit. As the size (capacity) of a plant increases, the optimal operating level increases and the minimum average cost per unit decreases. Thus, larger plants tend to have a larger optimal operating level and lower average cost per unit than smaller plants. Figure 5-6 illustrates this point, called economies of scale. However, beyond a certain size, the plant will be too large, expensive, and complex to manage. This is called diseconomies of scale. FIGURE 5-6 Average cost per unit and optimal operating level are functions of size of a production unit (graph shows economies of scale). Reasons for economies of scale include a reduction in fixed cost per unit produced because of higher production levels, and a reduction in operating cost per unit produced because of factors such as standardization. Reasons for diseconomies of scale include higher distribution costs due to congestion resulting from higher production levels, control and communication issues caused by complexity, additional levels of bureaucracy, and so on. In choosing the capacity of an operating unit, management must take these relationships into account along with the availability of financial and other resources and forecasts of demand. Planning Service Capacity While the foregoing discussion relates generally to capacity planning for both goods and services, it is important to note that capacity planning for services can present special challenges due to the nature of services. Three very important factors in planning service capacity are (1) the potential need to be near customers, (2) the inability to store services, and (3) the degree of volatility of demand. Convenience for customers is often an important aspect of service. Generally, a service must be located near customers. For example, hotel rooms must be where customers want to stay; having a vacant room in another city won’t help. Thus, capacity and location are closely tied. Page 188 Capacity also must be matched with the timing of demand. Unlike goods, services cannot be produced in one period and stored for use in a later period. Thus, an unsold seat on an airplane, train, or bus cannot be stored for use on a later trip. Similarly, inventories of goods allow customers to immediately satisfy wants, whereas a customer who wants a service may have to wait. This can result in a variety of negatives for an organization that provides the service. Thus, speed of delivery, or customer waiting time, becomes a major concern in service capacity planning. For example, deciding on the number of police officers and fire trucks to have on duty at any given time affects the speed of response and brings into question the cost of maintaining that capacity. Some of these issues are addressed in Chapter 18, on waiting lines. Demand volatility presents problems for capacity planners. Demand volatility tends to be higher for services than for goods, not only in timing of demand, but also in the amount of time required to service individual customers. For example, banks tend to experience higher volumes of demand on certain days of the week, and the number and nature of transactions tend to vary substantially for different individuals. Then, too, a wide range of social, cultural, and even weather factors can cause major peaks and valleys in demand. The fact that services can’t be stored means service systems cannot turn to inventory to smooth demand requirements on the system the way goods-producing systems are able to. Instead, service planners have to devise other methods of coping with demand volatility and cyclical demand. For example, to cope with peak demand periods, planners might consider hiring extra workers, hiring temporary workers, outsourcing some or all of a service, or using pricing and promotion to shift some demand to slower periods. In some instances, demand management strategies can be used to offset capacity limitations. Pricing, promotions, discounts, and similar tactics can help to shift some demand away from peak periods and into slow periods, allowing organizations to achieve a closer match in supply and demand. 5.3 Evaluating Alternatives LO3 Describe the break-even analysis approach for evaluating capacity alternatives, and use it to solve problems. An organization needs to evaluate alternatives for future capacity from a number of different perspectives. Most obvious are economic considerations: Will an alternative be economically feasible? How much will it cost? What will operating and maintenance costs be? What will the revenue be? What will its useful life be? There are also other considerations: Will it be compatible with present personnel and operations? What is the personal preference of managers? Less obvious, but nonetheless important, is possible negative public opinion. Any option that could disrupt lives and property (noise, traffic, pollution) is bound to generate hostile reactions. Construction of new facilities may necessitate moving personnel to a new location. Embracing a new technology may mean retraining some people and terminating some jobs. Relocation can cause unfavourable reactions, particularly if a town is about to lose a major employer. A number of techniques are useful for evaluating capacity alternatives from an economic standpoint. Some of the more common are break-even analysis, payback period, and net present value. Break-even analysis is described in this chapter. Break-Even Analysis Break-even analysis focuses on the relationship between costs, revenue, and volume (i.e., quantity) of output. The purpose of break-even analysis is to determine the quantity at which the initial investment starts to make a profit. Also called cost–volume–profit analysis, break-even analysis is particularly useful as a tool for comparing capacity alternatives. Use of break-even analysis requires identification of all costs related to the production of a given product. These costs are then classified as fixed or variable costs. Fixed costs tend to remain constant regardless of quantity of output. Examples include facility lease (or amortized land and building) cost, property tax, equipment costs, heating and cooling expenses, and certain administrative costs such as supervisors’ salaries. Variable costs vary directly with quantity of output. The major components of variable costs are generally materials and labour costs. We will assume that variable cost per unit remains the same regardless of quantity of output. Table 5-2 summarizes the symbols used in the break-even analysis formulas. All amounts, except υ and R, have a unit of time such as a month or a year. These have been mainly omitted Page 189 in this section for simplicity. TABLE 5-2 Break-even analysis symbols FC = Fixed cost VC = Total variable cost v = Variable cost per unit TC = Total cost TR = Total revenue R = Revenue per unit (i.e., price) Q = Quantity or volume of output QBEP = Break-even quantity P = Profit The total cost associated with a given quantity of output is equal to the sum of the fixed cost and the variable cost per unit times quantity: (5-4) TC VC = = FC + V C Q × v (5-5) Figure 5-7a shows the relationship between quantity of output and fixed cost, total variable cost, and total (fixed plus variable) cost. FIGURE 5-7 Break-even relationships Revenue per unit, like variable cost per unit, is assumed to be the same regardless of quantity of output. Assuming that all output can be sold, total revenue will have a linear relationship to output, as illustrated in TR = Figure 5-7b. The total revenue associated with a given quantity of output, Q, is: R × Q (5-6) Figure 5-7c describes the relationship between profit, which is the difference between total revenue and total cost, and quantity of output. The quantity at which total cost and total revenue are equal is referred to as the break-even point (BEP). When quantity (volume) is less than the break-even point, there is a loss; when quantity is greater than the break-even point, there is a profit. The greater the deviation from this point, the greater the profit or loss. Total profit can be calculated using the formula: Page 190 P = T R − T C = R × Q − (F C + v × Q) Factorizing Q, we have P = Q(R − υ) − F C (5-7) The difference between revenue per unit and variable cost per unit, R − v, is known as the contribution margin. Solving for Q, the required quantity needed to generate a specified profit P is: P + FC Q = (5-8) R − υ A special case of this is the quantity of output needed for total revenue to equal total cost: that is, when profit P = 0. This is the break-even point: FC Q BEP = (5-9) R − υ If demand is expected to be greater than the break-even point, then we conclude that it is a good capacity investment decision (i.e., will make a profit). Otherwise, it is not (i.e., will make a loss). EXAMPLE 5-4 The management of a large bakery is contemplating making pies, which will require leasing new equipment for a monthly cost of $6,000. Variable cost will be $2.00 per pie and retail price will be $7.00 each. a. How many pies must be sold per month in order to break even? b. What would the profit (loss) be if 1,000 pies were made and sold in a month? c. How many pies must be sold to realize a profit of $4,000 per month? d. If demand is expected to be 1,500 pies per month, is this a good investment? SOLUTION F C = $6, 000per month,v = $2per pie,R = $7per pie a. Q $6,000 FC BEP = = R − υ = 1,200 pies/month $7 − $2 b. For Q = 1,000, P = Q(R − v) − FC = 1,000 ($7 − $2) − $6,000 = −$1,000 (i.e., loss of $1,000) c. P = $4,000; solve for Q using Formula 5-8: $4,000 + $6,000 Q = = 2,000 pies $7 − $2 d. Because 1,500 > 1,200 = QBEP, this is a good investment. Break-even analysis can also be used for (1) make-or-buy decisions, and (2) deciding between two or more capacity alternatives (cost-vs.-cost analysis). See Figure 5-8. FIGURE 5-8 Two other types of analysis Page 191 The make-or-buy decision involves deciding whether to buy a machine (fixed cost) and make the product in-house (variable cost), or to buy the product (variable cost with no fixed cost). See Figure 5-8a. Assume that the vertical axis represents the total cost (fixed and variable) and the horizontal axis is the quantity. For both options, the total cost is linearly increasing in quantity (Q). There is a certain quantity before which the “buy” option is cheaper and after which the “make” option becomes cheaper. At this quantity, the company is indifferent between the make and buy options. The indifference point is indicated using the dashed line in the graph. LetT C and T C be the total costs m b associated with the make and buy options, respectively. Note, there is no fixed cost associated with the buy option as the only cost associated is the variable cost. Then we have: T Cm = F C + Q × νm and T Cb = Q × νb where υm = Per unit variable cost of make and υb = Per unit variable cost of buy (i.e., purchase price). Then, to find the indifference point, the two total cost equations should be equal to each other ( TC = T C ). By solving that equation, the indifference point will be: m Q = b (5-10) F C/(υ b − υ m ) A similar method could be used to do a cost-vs.-cost analysis involving a comparison between two (or more) “make” options: Machine A vs. Machine B. Each machine will have a fixed cost and a variable cost. See Figure 5-8b. Let FCA and vA be fixed cost and unit variable cost of Machine A, and FCB and vB be fixed cost and unit variable cost of Machine B. Then we have: T CA = F CA + Q × νA and T CB = F CB + Q × νB There is a certain quantity (Q) for which the total costs associated with Machines A and B are the same and the decision maker is indifferent between the two options. To find this indifference point (indicated on the graph using dashed lines), we need to set the two total costs equal to each other ( T C = T C ). By solving that equation, the indifference point will be: A Q = (F C A − F C B )/(υ B − υ A ) B (5-11) Break-Even Problem with Step Fixed Cost Capacity alternatives may involve step costs, which are costs that increase stepwise as range of output increases. For example, a company may have the option of purchasing one, two, or three machines. Each additional machine increases the fixed cost, although perhaps not equally (see Figure 5-9a). In this case, multiple break-even quantities may occur, possibly one for each range. This is illustrated in Figure 5-9b, where there is a break-even point in the second and another in the third range. In order to decide how many machines to purchase, a manager must compare forecast demand to the break-even points and choose the most appropriate number of machines, as Example 5-5 shows. FIGURE 5-9 Break-even problem with step fixed cost Page 192 Example 5-5 A manager has the option of purchasing one, two, or three machines. Fixed costs and range of output are as follows: Number of Machines Total Annual Fixed Cost ($) Corresponding Range of Output 1 9,600 0 to 300 2 15,000 301 to 600 3 20,000 601 to 900 Variable cost is $10 per unit, and revenue is $40 per unit. a. Determine the break-even point (if any) for each range. b. If projected annual demand is between 580 and 660 units, how many machines should the manager purchase? SOLUTION a. Calculate the break-even point for each range using the formula Q BE P = F C /(R – υ) $9,600 ForonemachineQ BEP = = 320 units [not in the range, so the $40/unit − $10/unit $15,000 For two machines Q BEP = = 500 units $40/unit − $10/unit $20,000 For three machines Q BEP = = 666.67 units $40/unit − $10/unit b. Comparing the projected range of demand to the two ranges for which a break-even point occurs (see the picture below), you can see that the break-even point is 500, which is in the range 301 to 600. This means that even if demand is realized to be at the low end of the specified range, it would be above this break-even point and will thus yield a profit. The same is not true for range 601 to 900. At the top end of projected demand, the volume would still be less than the break-even point for that range (666.67), so there would be no profit. Hence, the manager should choose two machines. Break-Even Point in Sales Dollars Suppose the decision maker wishes to know the BEP in dollars. That is, how much should the sales revenue be before the initial investment starts to produce a profit? Any amount of revenue that is smaller than this value will result in a loss. The break-even point in sales dollars can easily be determined from Q = F C/ (R– υ). Simply multiply both sides by R (revenue per unit) and simplify the right-hand side: BEP Break-even point in sales dollars = R × Q BEP = R(F C)/(R − υ) = F C/(1 − υ/R) For Example 5-6, Break-even point in sales dollars = $6, 000/ (1 − 2/7) = $8, 400. One benefit of using break-even point in sales dollars is where the investment can produce more than one type of output. In this case, FC Break-even point in sales dollars = ∑ [(1 − υi Ri )W i ] Where index i represents product i and Wi = Proportion of revenue due to product i. Example 5-6 The managers of the bakery in Example 5-4 think that they can also use the new equipment to make quiches. Quiches will have variable cost of $3 and will sell for $10 each. Management estimates that pies and quiches will bring approximately the same amount of revenue. Recall that leasing the equipment will cost $6,000 per month, and that the variable cost of a pie is $2.00 and its sales price is $7.00. Calculate the breakeven point in dollars. Juice Images/Glow Images SOLUTION Olha Afanasieva/Shutterstock FC Q BEP$ = 6,000 = ∑ [(1 − υi Ri = $8,484.85 2 )W i ] (1 − 3 )0.5 + (1 − 7 )0.5 10 Based on the results, the break-even point in sales dollars is $8,484.85. Any monthly revenue lower than this amount will result in a loss for the bakery. As with any quantitative tool, it is important to verify that the assumptions on which the break- Page 193 even analysis is based are reasonably satisfied for a particular situation. Note that revenue per unit or variable cost per unit is not always constant. Also, break-even analysis requires that fixed and variable costs be separated, and this is sometimes exceedingly difficult to accomplish. A notable benefit of the break-even analysis is the conceptual framework it provides for integrating cost, revenue, and profit estimates into capacity decisions. If a proposal looks attractive using cost–volume analysis, the next step would be to develop cash flow models to see how it fares with the addition of time and more flexible cost functions. Financial Analysis Operations personnel need to have the ability to do financial analysis. A problem that is universally encountered by managers is how to allocate scarce funds. A common approach is to use financial analysis to rank investment proposals, taking into account the time value of money. Two important terms in financial analysis are cash flow and present value: Cash flow refers to the difference between the cash received from sales (of goods or services) and other sources (e.g., sale of old equipment) and the cash outflow for labour, materials, overhead, and taxes. Present value expresses in current value the sum of all future cash flows of an investment proposal. The three most commonly used methods of financial analysis are payback, present value, and internal rate of return. Payback is a crude but widely used method that focuses on the length of time it will take for an investment to return its original cost. For example, an investment with an original cost of $6,000 and a monthly net cash flow of $1,000 has a payback period of six months. Initial cost Payback time = Annual saving EXAMPLE 5-7 A new machine will cost $2,000, but it will result in savings of $500 per year. What is the payback time in years? SOLUTION Initial cost = $2,000;Annual savings = $500 The payback time is initial cost divided by annual savings. Thus, the payback time is Initial cost Paybacktime = $2, 000 = Annual saving = 4 years $500/yr Payback ignores the time value of money. Its use is easier to rationalize for short-term than for long-term projects. For an example, see the “ Solar Power” OM in Action. OM in ACTION Solar Power Jenson/Shutterstock In 2016, electricity generation by solar power became cheaper than coal for the very first time. This is the result of exponential gains in efficiency within the past five years, during which solar panel yield jumped from about 15 percent to 22 percent efficiency. A consequence of these efficiency gains is a significant reduction in the cost of solar power, from $300 per megawatt-hour to less than one-third of that. According to Natural Resources Canada, the cost of electrical generation from solar has become economical enough to reach grid parity. Even before these gains, installing solar panels in Ontario had become economical because the government agreed to buy electricity from solar power producers at a premium price (44.3 cents per kilowatt-hour). The Sarnia solar farm, owned by Enbridge, is Canada’s largest with an installed capacity of 80 megawatts of AC power. It was completed in 2010 at a cost of $400 million. First Solar developed, engineered, and constructed the facility, and is operating it for Enbridge under a long-term contract. Enbridge is selling the power to the Ontario Power Authority pursuant to 20-year power purchase agreements. The plant covers 1,100 acres and contains about 635 acres of solar panels, which is about 1.3 million thin-film panels. The expected annual energy yield is about 120,000 megawatt-hours. This is equivalent to 1500 hours (= 120,000/80) of electricity generation at maximum capacity. Assuming that the annual operating cost was part of the initial construction cost, the payback period to Enbridge is $400million/$0.443 × 120, 000 × 1000 = 7.5years. The present value (PV) method summarizes the initial cost of an investment, its estimated annual cash flows, and any expected salvage value in a single value called the equivalent current value, taking into account the time value of money (i.e., interest rates). Page 194 The internal rate of return (IRR) summarizes the initial cost, expected annual cash flows, and estimated future salvage value of an investment proposal in an equivalent interest rate. In other words, this method identifies the rate of return that equates the estimated future returns and the initial cost. These techniques are appropriate when there is a high degree of certainty associated with estimates of future cash flows. In many instances, however, operations managers and other managers must deal with situations better described as risky or uncertain. When conditions of risk or uncertainty are present, decision theory is often applied. 5.4 Operations Strategy LO4 Describe the implications of capacity decisions in the operations strategy of the firm. The strategic implications of capacity decisions can be enormous, impacting all areas of the organization. From an operations management standpoint, capacity decisions establish a set of conditions within which operations will be required to function. Hence, it is extremely important to include input from operations management people in making capacity decisions. Flexibility can be a key issue in capacity decisions, although flexibility is not always an option, particularly in capital-intensive industries. However, where possible, flexibility allows an organization to be agilethat is, responsive to changes in the marketplace. Also, it reduces to a certain extent the dependence on long-range forecasts to accurately predict demand. And flexibility makes it easier for organizations to take advantage of technological and other innovations. Maintaining excess capacity (a capacity cushion) may provide a degree of flexibility, albeit at added cost. Some organizations use a strategy of maintaining a capacity cushion for the purpose of Page 195 blocking entry into the market by new competitors. The excess capacity enables them to produce at costs lower than what new competitors can. However, such a strategy means higher-thannecessary unit costs, and it makes it more difficult to cut back if demand slows, or to shift to new product or service offerings. Efficiency improvements and utilization improvements can provide capacity increases. Such improvements can be achieved by streamlining operations and reducing waste. The chapter on lean operations describes ways for achieving those improvements. Bottleneck management can be a way to increase effective capacity, by scheduling non-bottleneck operations to achieve maximum utilization of bottleneck operations. In cases where capacity expansion will be undertaken, there are two strategies for determining the timing and degree of capacity expansion. One is the leading strategy (i.e., before demand materializes). The intent might be to achieve economies of scale, to expand market share, or to preempt competitors from expanding. The risks of this strategy include an oversupply that would drive prices down, and underutilized equipment that would result in higher unit costs. The other approach is the lagging strategy (i.e., to expand capacity only after demand materializes, perhaps incrementally). Its advantages include a lower chance of oversupply due to more accurate matching of supply and demand, and higher capacity utilization. The key risks are loss of market share and the inability to meet demand if expansion requires a long lead time. In cases where capacity contraction will be undertaken, capacity disposal strategies become important. This can be the result of the need to replace aging equipment with newer equipment. It can also be the result of outsourcing and downsizing operations. The cost or benefit of asset disposal should be taken into account when contemplating these actions. SUMMARY Design capacity is the theoretical maximum output rate, but effective capacity is limited by work break hours, maintenance, and so on. Efficiency is the ratio of actual output rate to effective capacity. Capacity utilization of a unit is the ratio of actual output to design capacity. Overall equipment effectiveness provides a picture of how well your manufacturing process is running, and helps to track improvements over time. A variety of factors can influence effective capacity. These include facility design and layout, human factors, product factors, equipment maintenance, scheduling problems, and quality considerations. Capacity planning is the process of determining alternatives in order to meet long-term forecasted demand. Development of capacity alternatives is enhanced by considering the life cycle of the product, designing systems with flexible capacity, timing the capacity plan before demand occurs, taking a systems approach to planning, recognizing that capacity increments are often acquired in chunks, practising demand management and utilizing complementary products, using capacity cushion, and choosing the right capacity and optimal operating level. One or more constraints can adversely affect the overall capacity of a system. Capacity increases can only be achieved by loosening the bottleneck(s), not by increasing other resources. In evaluating capacity alternatives, a manager must consider both quantitative and qualitative aspects. Quantitative analysis usually reflects economic factors, and qualitative considerations include intangibles such as operational fit and personal preferences of managers. Break-even analysis determines the quantity beyond which profit will be attained. KEY TERMS bottleneck operation break-even point (BEP) capacity capacity cushion capacity utilization cash flow design capacity effective capacity efficiency optimal operating level present value strategic capacity planning Page 196 SOLVED PROBLEMS Problem 1 A manager must decide whether to make or buy a certain item used in the production of vending machines. Cost and demand estimates are as follows: Make Buy Annual fixed cost $150,000 $0 Variable cost/unit $60 $80 12,000 12,000 Annual demand (units) a. Given these numbers, should the company buy or make this item? b. There is a possibility that demand could change in the future. At what quantity would the manager be indifferent between making and buying? Solution a. Determine the annual cost of each alternative: Total cost = Fixed cost + Quantity × Variable cost Make : $150, 000 + 12, 000 ($60) = $870, 000 Buy : $0 + 12, 000 ($80) = $960, 000 Because the annual cost of making the item is less than the annual cost of buying it, the manager should make the item. b. To determine the quantity at which the two choices would be equivalent, set the two total costs equal to each other, and solve for quantity: T C = TC . Thus, $150, 000 + Q ($60) = $0 + Q ($80). Solving for Q, we get Q = 7, 500 units. make Alternatively, one can use buy Formula 5-9: Q = F C/(υ b − υ m ) = $150, 000/ ($80– $60) = 7, 500 units. Therefore, at 7,500 units a year, the manager would be indifferent between making and buying. For lower demand the choice would be to buy, and for higher demand the choice would be to make. Problem 2 A toy company wants to make electric turtles. The line will have a monthly fixed cost of $42,000 and variable costs of $3 per turtle. Turtles would sell for $7 each. Prepare a table that shows total revenue, total variable cost, fixed cost, total cost, and profit for monthly demands of 10,000, 12,000, and 15,000 units. In what range do you expect the break-even point to lie? Calculate the break-even point. Solution Revenue = $7 per unit Variable cost = $3 per unit Fixed cost = $42,000 per month Prof it = Q(R − υ) − F C Totalcost = FC + υ × Q Page 197 Demand Total Revenue Total VC Fixed Cost Total Cost Profit 10,000 70,000 30,000 42,000 72,000 (2,000) 12,000 4,000 36,000 42,000 78,000 6,000 15,000 105,000 45,000 42,000 87,000 18,000 The break-even point would lie between 10,000 and 12,000 units per month (look at the profits). FC Q BEP = $42,000 = R − υ = 10,500 units per month $7 − $3 Problem 3 Refer to Problem 2. Develop an equation that can be used to calculate monthly profit for any quantity. Use that equation to determine profit when quantity equals 22,000 units per month. Solution Prof it = Q(R − υ) − F C = Q($7 − $3) − $42,000 = $4Q − $42,000 For Q = 22,000, prof it is $4(22,000) − $42,000 = $46,000 Problem 4 A manager must decide which type of machine to buy, Type A or Type B, and how many (assume only one machine type can be purchased). Type A machine costs $15,000 each, and Type B machine costs $11,000 each. The machines are operated eight hours a day, 250 days a year. The variable cost of using either machine is negligible. Either machine can be used to perform two types of chemical analysis, C1 and C2, but the processing times will be different. Annual quantities (i.e., number of analyses) and processing times are shown in the following table. The goal is to minimize total purchase cost but meet annual requirements within the available hours. Processing Time per Analysis (hr) Analysis Type Annual Quantity A B C1 1,200 1 2 C2 900 3 2 Solution Total processing time (annual quantity multiplied by processing time per analysis) needed by the type of equipment is: Analysis Type A B C1 1,200 2,400 C2 2,700 1,800 3,900 4,200 hrs Total Total processing time available per machine is 8 hours/day × 250 days/year = 2,000 hours per year. Hence, one machine can handle 2,000 hours of analysis, two machines can handle 4,000 hours, etc. Given the total processing requirements, two Type A machines would be needed for a total cost of 2 × $15, 000 = $30, 000, or three Type B machines would be needed for a total cost of 3 × $11, 000 = $33, 000. Thus, two machines of Type A would have lower cost than three Type B machines. Problem 5 A new machine will cost $2,000, but it will result in savings of $500 per year. What is the payback time in years? Page 198 Solution Initial cost = $2, 000 Annual savings = $500 The payback time is initial cost divided by annual savings. Thus, the payback time is Initial cost Payback time = $2,000 = Annual savings = 4years $500/yr Problem 6 What is the capacity (attainable output) of this system where the product is made on two parallel lines (1-2-3 and 4-5-6) that join for finishing in operation 7? Solution The attainable output of each portion of the system is equal to the output of the slowest operation. So the output of the upper portion is 10 units per hour and the output of the lower portion is 9 units per hour. Together the two portions can produce 10 + 9 = 19 units per hour. Although operation 7 can handle 20 units per hour, only 19 units per hour come from the two previous portions of the system, so the system output can be only 19 units per hour. DISCUSSION AND REVIEW QUESTIONS LO1 1. What is capacity? Give an example. 2. How do long-term, medium-term, and short-term capacity decisions differ? 3. Why is the long-term capacity decision important? Give three reasons. 4. Contrast design capacity and effective capacity. LO1 LO1 LO1 5. Propose measures of capacity for a hospital and for an airline. In what way are the LO1 measures similar and different? 6. Contrast efficiency and utilization. LO1 LO1 & LO2 8. How can long-term capacity requirements be determined? LO2 7. What is capacity planning and how is it done? 9. Give one example of building flexibility into system capacity. LO2 10. What is a bottleneck operation? Name two places/operations in an airport that are usually bottlenecks. LO2 11. What is meant by the term capacity chunks? Give an example. What are leading and lagging strategies for timing capacity increases? Should essential services such as utilities use the leading or lagging strategy? Explain. LO2 12. What are economies of scale? Give an example. Is there a limit to it? Explain. 13. How do electrical utilities meet abnormal peak demand? Name three ways. 14. What influences effective capacity? LO2 LO2 LO1 15. What is the optimal operating level for a machine and why is it usually less than its design capacity? LO2 16. What is capacity cushion? Give an example of an industry sector that should have capacity cushion. LO2 17. Discuss how capacity planning for essential services such as utilities differs from capacity planning for other services. LO2 18. When Air Canada emerged from bankruptcy protection in 2004, its top management decided to replace some of its older planes with new ones. In particular, several relatively small Embraer and Bombardier planes (with fewer than 90 seats) and several large Boeing 777s and 787s (with more than 200 seats) were ordered. These are much more fuel efficient than the planes they replaced. However, Air Canada operations are still not as low cost as WestJet’s. An available seat mile costs Air Canada approximately $0.17 whereas it costs WestJet approximately $0.14. Recall that WestJet is non-unionized, runs only one type of plane (Boeing 737, which seats 119–166 passengers), and is financially stronger. Discuss the pros and cons of Air Canada’s decision. 19. What is break-even analysis and how is it used? LO1 & LO2 LO3 20. What are some capacity measures for each of the following? LO1 a. University. b. Hospital. c. Computer repair shop. d. Farm. 21. Why is it important to adopt a big-picture approach to capacity planning? LO2 22. Why is capacity planning for services more challenging than it is for goods production? LO2 23. What kinds of capacity problems do many elementary and secondary schools periodically experience? What are some alternatives used to deal with those problems? LO2 TAKING STOCK 1. What are two major trade-offs in capacity planning? 2. Who needs to be involved in capacity planning? Why? LO2 Page 199 LO1 3. In what ways has technology had an impact on capacity planning? What are the upsides and the downsides? LO2 4. When Air Canada went into bankruptcy in 2003–2004, a new holding company, ACE, was formed with the goal of breaking up various business units of Air Canada such as the Aeroplan customer loyalty plan, the maintenance department, and the regional subsidiary airline Jazz. ACE managed to achieve its goals against the opposition of Air Canada employees, especially its pilots. Air Canada employees were put into a weak bargaining position. What was left of Air Canada was practically worthless. Is what has happened to Air Canada unethical? Explain. LO2 CRITICAL THINKING EXERCISES 1. An agricultural machinery manufacturer can potentially make eight units per day. Its effective capacity, however, is four units per day, and its actual output is three units per day. The manager would like to increase the output per day. Which of the following factors would you recommend that the manager investigate first: quality problems, absenteeism, or scheduling and balancing? Explain your reasoning. LO1 2. Compared to manufacturing, capacity planning for services is more location dependent and time dependent. Why is this true? LO2 PROBLEMS 1. Determine the utilization and efficiency for each of the following situations. Page 200 LO1 a. A loan processing operation that processes an average of 7 loans per day. The Page 201 operation has a design capacity of 10 loans per day and an effective capacity of Page 202 8 loans per day. b. A furnace repair team that services an average of four furnaces a day if the Page 203 design capacity is six furnaces a day and the effective capacity is five furnaces a Page 204 day. c. Would you say that systems that have higher efficiency ratios than other systems will always have higher utilization ratios than those other systems? Explain. 2. In a job shop, effective capacity is only 50 percent of design capacity, and actual output is 80 percent of effective capacity. What design capacity would be needed to achieve an actual output of eight jobs per week? LO1 3. A producer of pottery is considering the addition of a new factory to absorb the backlog of demand that now exists. The primary location being considered will have fixed cost of $9,200 per month and variable cost of $0.70 per unit produced. Each item is sold to retailers at a price that averages $0.90. LO3 a. What quantity per month is required in order to break even? b. What profit would be realized on a monthly quantity of 61,000 units? 87,000 units? c. What quantity is needed to obtain a profit of $16,000 per month? d. What quantity is needed to provide revenue of $23,000 per month? e. Plot the total cost and total revenue lines against quantity per month. 4. A small company intends to increase the capacity of its bottleneck operation by adding a new machine. Two alternatives, A and B, have been identified, and the associated costs and revenues have been estimated. Annual fixed costs would be $40,000 for A and $30,000 for B; variable costs per unit would be $10 for A and $12 for B; and revenue per unit would be $15 for A and $16 for B. LO3 a. Determine each alternative’s break-even point. b. At what quantity would the two alternatives yield the same profit? c. If expected annual demand is 12,000 units, which alternative would yield higher profit? 5. The selling price for a felt-tip pen is $1. Fixed cost of the operation is $25,000 per month and variable cost is 50 cents per pen. LO3 a. Find the break-even quantity. b. How many pens must be sold to obtain a monthly profit of $15,000? c. What is the break-even point in sales dollars? d. Another type of marker with the following characteristics can also be produced by the machine: Selling price = $2 each, Variable cost = $0.75 each, and Proportion of revenue = 30%. Calculate the break-even point in sales dollars. 6. A real estate agent is considering changing her landline phone plan. There are three plans to choose from, all of which involve a monthly service charge of $20. Plan A has a cost of $.45 a minute for daytime calls and $.20 a minute for evening calls. Plan B has a charge of $.55 a minute for daytime calls and $.15 a minute for evening calls. Plan C has a flat rate of $80 with 200 minutes of calls allowed per month and a charge of $.40 per minute beyond that, day or evening. LO3 a. Determine the total charge under each plan for this case: 120 minutes of day calls and 40 minutes of evening calls in a month. b. Prepare a graph that shows total monthly cost for each plan versus daytime call minutes. c. If the agent will use the service for daytime calls, over what range of call minutes will each plan be optimal? d. Suppose the agent expects both daytime and evening calls. At what point (i.e., percentage of call minutes for daytime calls) would she be indifferent between plans A and B? 7. A company plans to begin production of a new small appliance. The manager must decide whether to purchase the motor for the appliance from a vendor at $7 each or to produce them in-house. Either of two processes could be used for in-house production; one would have an annual fixed cost of $160,000 and a variable cost of $5 per unit, and the other would have an annual fixed cost of $190,000 and a variable cost of $4 per unit. Determine the range of annual quantity for which each of the alternatives would be best. LO3 8. A manager is trying to decide whether to purchase a certain part or to have it produced internally. Internal production could use either of two processes. One would entail a variable cost of $16 per unit and an annual fixed cost of $200,000; the other would entail a variable cost of $14 per unit and an annual fixed cost of $240,000. Three vendors are willing to provide the part. Vendor A has a price of $20 per unit for any annual quantity up to 30,000 units. Vendor B has a price of $22 per unit if demand is 1,000 units or less, but $18 per unit (for all units) if demand is greater. Vendor C offers a price of $21 per unit for the first 1,000 units, and $19 per unit for additional units. LO3 a. If the manager anticipates an annual demand of 10,000 units, which alternative would be best from a cost standpoint? For 60,000 units, which alternative would be best? b. Determine the range for which each alternative is best. Are there any alternatives that are never best? If so, which ones? 9. A company manufactures a product using two identical machines. Each machine has a design capacity of 250 units per day and an effective capacity of 230 units per day. At present, actual output averages 200 units per machine, but the manager estimates that productivity improvements soon will increase output to 225 units per day. Annual demand for the product is currently 50,000 units, but it is expected that within two years annual demand will triple. How many machines should the company plan to have to satisfy the forecasted demand? Assume 240 workdays per year. LO2 10. A manager must decide which type of machine to buy, A, B, or C. Machine fixed costs LO2 are: Machine Cost/Year A $40,000 B $30,000 C $80,000 The company makes four products. Product demand forecasts and unit processing times on each machine are as follows: Processing Time Per Unit (Minutes) Product Annual Demand A B C 1 16,000 3 4 2 2 12,000 4 4 3 Processing Time Per Unit (Minutes) Product Annual Demand A B C 3 6,000 5 6 4 4 30,000 2 2 1 a. Assume that only purchasing costs are being considered. Which machine would have the lowest total cost, and how many of that machine would be needed? Machines operate 10 hours a day, 250 days a year. b. Consider this additional information: The machines differ in terms of hourly operating costs: The A machines have an hourly operating cost of $10 each, B machines have an hourly operating cost of $11 each, and C machines have an hourly operating cost of $12 each. Which alternative machine should be selected, and how many would be necessary to minimize total cost while satisfying processing requirements? 11. A company must decide which type of machine to buy and how many units of that type given the following information: LO2 Type Cost 1 $10,000 2 $14,000 Product demand and processing times for the equipment are: Processing Time Per Unit (Minutes) Product Annual Demand 1 2 1 12,000 4 6 2 10,000 9 9 3 18,000 5 3 a. How many machines of each type would be required to handle demand if the machines will operate eight hours a day, 250 days a year, and what annual capacity cushion in processing time would result for each? b. With high certainty of annual demand, which type of machine would be chosen if that was an important consideration? With low certainty, which type of machine would be chosen? c. If purchasing and operating costs are taken into account, which type of machine would minimize total costs, given your answer for part a? Operating costs are $6/hr for type 1 and $5/hr for type 2. 12. A manager must decide how many machines of a certain type to purchase. Each machine can process 100 customers per day. One machine will result in a fixed cost of $2,000 per day, while two machines will result in a fixed cost of $3,800 per day. Variable costs will be $20 per customer, and revenue will be $45 per customer. LO3 a. Determine the break-even points for one machine and two machines. b. If estimated demand is 90 to 120 customers per day, how many machines should be purchased? 13. The manager of a car wash must decide whether to have one or two wash lines. One line will mean a fixed cost of $6,000 a month, and two lines will mean a fixed cost of $10,500 a month. Each line would be able to process 15 cars an hour. Variable costs will be $3 per car, and revenue will be $5.95 per car. The manager projects an average demand of between 14 and 18 cars an hour. Would you recommend one or two lines? The car wash is open 300 hours a month. LO3 14. The total demand for polypropylene, a type of plastic, in North America is approximately 11 billion pounds. The VP of operations at a chemical product manufacturer predicts (based on the previous 10 years) that total demand will grow anywhere between 5 percent and 8 percent annually. The total capacity is currently 12.3 billion pounds. In addition, a total of 4.5 billion pounds of new capacity is under construction by eight companies in eight locations and will be ready for production within the next four years. Will total capacity be enough to meet expected demand four years from now? LO2 15. A parts manufacturer plans to replace its existing facility with a new one. The management is considering two possible capacities for the new facility: 200,000 or 250,000 units per year. The 200,000-unit plant would have an annual fixed cost of $4 million and a per unit production cost of $20. The 250,000-unit plant would have an annual fixed cost of $6 million and a per unit cost of $15. The parts will be sold for an average price of $60 per unit. LO3 a. Calculate the break-even point for each capacity alternative. b. Suppose that the company projects its sales to be 220,000 units per year. Which alternative would you recommend? (Hint: Calculate the annual profit in each case.) 16. The fixed cost of running a gift store (wages, rent, etc.) in a particular mall is $250,000 per year.1 The gross margin (i.e., Sales – Cost of goods sold, or alternatively, Revenue – Variable cost) is 45 percent of sales. Assume that the store is open 364 days a year. LO3 a. What are the minimum daily sales dollars to break even? b. If the owner’s profit target is 10 percent of sales, what are the minimum daily sales dollars? c. If the owner’s profit target is $100,000 per year, what are the minimum daily sales dollars? 17. One of the first Internet-based grocery home-delivery businesses was Homegrocer.com. In 1998, Mike Donald (president of Concord Sales, one of the largest food brokers in British Columbia) and two partners thought of starting such a business in Vancouver. However, they had to move it to Seattle in order to get financing from U.S. financiers. Mike thought that because Microsoft and Boeing are located in Seattle, the proportion of households with Internet would be high. After raising approximately $4 million and using it to lease a large warehouse, purchase 10 trucks, set up the web page and software, and advertise, Homegrocer.com had fewer than 1,000 regular customers. Mike estimated that an average regular customer purchased three times a month and bought approximately $75 each time (below $75, Homegrocer.com charged a delivery fee of $10). The gross margin (i.e., Sales – Cost of goods sold, or alternatively, Revenue – Variable cost) was around 20 percent, and total monthly labour and overhead costs were approximately $300,000. LO3 a. How many regular customers did Homegrocer.com need in 1998 to break even? Despite the slow initial business, Homegrocer.com persevered and even expanded into Portland, Oregon. In the frenzy of the dot.com era in 1999, private investors, including Amazon.com, invested approximately $100 million in Homegrocer.com. Homegrocer.com used the money to further expand, trying to compete with Webvan, a California-based competitor. At the beginning of 2000, Homegrocer.com raised over $250 million by issuing shares to the public, and kept on expanding to more cities in the United States. However, its share prices started to decline due to increasing losses. In mid-2000, Webvan bought Homegrocer.com for over $1 billion. Webvan itself went bankrupt in 2001. b. Why would a startup company want to expand so fast? Why did most Internet grocery businesses fail?2 18. A few years ago, the Toronto plant of a multinational soup producer was in competition with its U.S. sister plant to supply the Northeastern U.S. market. However, its cost of production was not competitive. One source of its cost disadvantage was the tin cans. The Toronto plant bought its tin cans for approximately $6.00 per case of 48 cans, whereas the U.S. plant made its own cans at the cost of $5.00 (in Canadian dollars) per case. The manager estimated that installing an automatic can line would cost $2 million for building expansion and $12 million for equipment. The can line would have a variable production cost of $5.50 per case. LO3 a. Assuming a useful life of 10 years, no salvage value, and straight-line depreciation, calculate the annual fixed cost of the canning line. b. Calculate the annual break-even quantity between buying and making the cans in-house. c. Draw a graph of the annual cost of buying and annual cost of making (try to make it to scale), and determine which option is better if the annual requirement of the Toronto plant was 5 million cases of cans. 19. Suppose your friend is thinking of opening a new restaurant, and hopes to have around 20 groups of (on average) four customers on a typical busy evening. Each meal will take around 1.5 hours and it is expected that on average a table will be used twice in an evening. Each table and its surroundings will require four square metres of space. LO2 a. Calculate the required seating area. b. If each meal will take an average of 12 minutes to cook on a heating element, and each stove will have four elements, how many stoves would the restaurant require? Assume that all 10 “tables” could come at the same time and that the kitchen should be able to cook the meal for them during the first hour of their visit. 20. Corner Tavern is a small-town bar that sells only bottled beer. The average price of a bottle of beer at the tavern is $3.00 and the average cost of a bottle of beer to the tavern is $1.00. The tavern is open every night. One bartender and two to three servers are on duty each night. The fixed costs (salaries, rent, tax, utilities, etc.) total $260,000 per year. LO3 a. The owner wishes to know how many bottles of beer the tavern must sell during the year to start making a profit. b. What is the revenue at the break-even quantity found in part a? c. Draw the annual revenue and total annual cost vs. the number of bottles of beer sold per year. Make sure that the y axis is to scale. Identify the important points on the graph. d. Using the graph in part c, answer the following question: If Corner Tavern sold 140,000 bottles of beer a year, would it make a profit? Explain. e. The owner thinks $50,000 is a reasonable annual profit. How many bottles of beer should the tavern sell to make $50,000 profit? f. An available option is to open the tavern earlier on the weekends. The attraction would be a discount of $0.50 off the regular price. The extra salaries of servers and bartender for the whole year are estimated to be $30,000. How many extra bottles of beer must the tavern sell in order to break even in this option? 21. A small brewery reuses its own empty bottles, but it does not have a bottle-cleaning machine. The empty bottles are collected from liquor stores and bars, and brought back to the brewery. Once enough empty bottles accumulate, they are trucked to a cleaning facility and clean bottles are brought back. The cleaning facility charges $0.10 to wash a bottle, and cost of trucking is $0.02 per bottle. Management is thinking of buying an automated bottle-cleaning machine. The machine costs $1 million and has a useful life of 10 years. The machine will be used only when enough empty bottles accumulate. The operating cost of the machine is expected to be $108 per hour, washing 60 bottles per minute. LO3 a. How many bottles per year would have equal total annual cost of doing the cleaning in- house versus outsourcing the cleaning? Use straight-line depreciation. b. What is the total annual cost at the quantity found in part a? c. Draw the two total annual costs vs. the quantity of bottles per year. Make sure that the y axis is to scale. If the brewery is expected to have 1 million bottles per year to wash, which decision is less costly? 22. The following diagram shows a four-step process that begins with Operation 1 and ends with Operation 4. The rate shown with each box represents the effective capacity of that operation. LO2 a. Determine the capacity of this process. b. Which of the following three actions would yield the greatest increase in process capacity? (i) increase the capacity of Operation 1 by 15 percent; (ii) increase the capacity of Operation 2 by 10 percent; or (iii) increase the capacity of Operation 3 by 10 percent. Diagram for Problem 22 23. Given the following diagram, LO2 a. What is the capacity of this process? b. If the capacity of one operation could be increased in order to increase the output of the process, which operation should it be, and what amount of increase? Note: The upper line and lower line both produce the same product. Diagram for Problem 23 24. Find the capacity of this process: Diagram for Problem 24 LO2 25. The following diagram describes a service process where customers go through either of two parallel sets of three steps and then merge into a single line for two final steps. The capacity of each step is shown on the diagram. LO2 a. What is the current capacity of the entire process? b. If you could increase the capacity of only one operation through process improvement efforts, which operation would you select, how much additional capacity would you strive for, and what would be the resulting capacity of the process be? Diagram for Problem 25 26. Jamesco is a major furniture producer in Winnipeg. The company has recently received a large order of armoires from a high-end furniture reseller in Ontario. The diagram below is a simplified version of the production process. The number to the right of each box represents the number of unit(s) required to assemble the next item. LO2 a. Calculate the hourly capacity of the production process and identify the bottleneck. b. If the capacity of the bottleneck in part a is doubled, what is the new hourly capacity and bottleneck? c. If the capacity of the bottleneck in part b is increased by 50 percent, what is the new hourly capacity and bottleneck? d. If any non-bottleneck process is increased, will the capacity of the assembly line ever increase? 27. The diagram below represents a simplified version of the steel production process at a steel mill and the capacity of each operation in tonnes per day (tpd). The outputs from iron ore processing, limestone processing, and coking coal oven need to be combined in a ratio of 4:1:2 into the blast furnace. Output of blast furnace equals the output of iron ore processing; limestone and coke are only for purifying and burning. The outputs from the blast furnace and recycled steel need to be combined in a ratio of 2:1 for the oxygen furnace. Output of oxygen furnace = Output of blast furnace + Output of recycled steel. The remaining processes have a ratio of 1:1 with their downstream process. LO2 a. Calculate the daily capacity of the production process and identify the bottleneck. b. If the capacity of the bottleneck in part a is increased by 50 percent, what is the new daily capacity and bottleneck? c. What further improvements are needed to bring plant production to 2,700 tpd? 28. A new piece of equipment will cost $12,000 and will result in a reduced operation cost of $1,500 per year. What will the payback time be in years? LO3 29. A new machine will cost $18,000, but results in savings of $2,400 per year. What will be the payback time in years? LO3 30. Remodelling an office will cost $25,000 and will generate savings of $3,000 the first year, $4,000 the second year, and $5,000 per year thereafter. How long will it take to recoup the initial cost of remodelling? LO3 31. Mountain Aquaculture and Producers Association (MA&PA) is a small trout producers’ cooperative in West Virginia.3 Its main product is boned, head-removed trout sold to local stores. Unfortunately, the cooperative has not made any profit since it was started in 1992 and has to rely on donations and government grants. The manager wants to know under what circumstances MA&PA would make a profit. The building was constructed in 1992 for $49,000, and the processing equipment cost $37,500. The utilities cost $6,800 per year, and the building tax is $1,100 per year. A pound of whole trout costs $1.40, and the yield is 60 percent (i.e., to make one pound of processed trout, 1.67 pounds of whole trout is needed). It takes a worker 12 minutes to produce one pound of processed trout. The wage rate, including benefits, is $7.80 per hour. The total cost of processing supplies, advertising, and delivery is $1 per pound of processed trout. The processed trout is sold for $6.00 per pound. Use straight-line depreciation and life of 20 years for the building and 10 years for the processing equipment. LO3 a. Calculate the total annual fixed cost. b. Calculate the variable cost per pound of processed trout. c. Calculate the break-even quantity for the number of pounds of processed trout sold per year. d. What is the minimum amount of processed trout that the cooperative must sell per year in order to make any profit? MINI-CASES Page 205 Mini-Case Packaging System Alternatives A freezer manufacturer in Canada has two plants in Guelph, Ontario; one in the United States; and another in Mexico. The VP of manufacturing is wondering if the company should move away from using cardboard box packaging and instead use plastic stretch wrap with corner padding (called clear-view packaging). She would like to investigate the implications of such conversion. If the company adopts the new packaging method, the damage warranty rate for cardboard box packaging (1–3 percent depending on the type of freezer) is expected to remain the same with clear-view packaging. For simplicity, we consider only one of the Guelph plants with one line. While a cardboard box requires two workers to box an appliance, the clear-view packaging would be automated. With clear packaging, labour and material costs would be reduced by $0.50 and $1.50 per unit, respectively. However, electricity costs would increase by $10,000 per year under the clearpackaging system. In addition to those, to convert to clear packaging, stretch wrap equipment needs to be purchased at the cost $130,000. The fitting of corner posts on each freezer would require another machine, which costs $140,000. Also, all lift truck arms have to be converted to clamp type at a total cost of $30,000. Questions 1. What is the total variable cost saving per freezer? 2. Under the clear-packaging system, what is the total investment cost per year if all pieces of equipment were expected to last 10 years (use linear depreciation assuming equal depreciation per year over the life cycle)? 3. How many freezers per year would the Guelph plant need to produce in order to break even in the clear-view packaging conversion? Mini-Case Shoes for Moos Jim Wells, the owner of a farm supply store in Elmira, Ontario, was thinking of introducing a new product: shoes for cows with foot (hoof) infection (rot). Jim had been approached by several farmers asking for cow shoes. He studied the market and found nothing durable and effective at the $40–$100 per shoe range. There are over 13 million dairy cows in North America, and approximately 2 percent of them develop foot infection annually (beef cows are slaughtered when this happens). Jim designed the shoe and approached Kaufman Footwear in Kitchener to make some prototypes. Next, he gave the prototypes to his farmer friends to test. After one year of design improvements, Jim was wondering whether to go ahead with marketing of the shoe. The cost of the mould to be used by the shoe factory was $10,000, and the mould was expected to last five years (use straight-line depreciation). The cost of Jim’s time promoting the shoe, including attending farm shows, was approximately $10,000 per year. The cost of shoe inventory and space in Jim’s store was estimated to be $1,000 per year. The shoe factory wanted $20 per shoe with a minimum order size of 100 shoes. Jim was thinking of pricing a shoe at $40. Questions 1. How many shoes per year must Jim sell to break even? 2. What is the annual cost at the BEP found in Question 1? 3. If Jim could sell 1,000 shoes per year, should he go ahead with this venture? Why? 4. If the shoe factory informed Jim that their cost per shoe had increased from $20 to $30, would you recommend he go ahead with this venture if he could sell 1,000 shoes per year? Why? To access “Decision Theory,” the supplement to Chapter 5, please visit Connect. SUPPLEMENT TO CHAPTER 5 Decision Theory Page 5S-1 LEARNING OBJECTIVES After completing this supplement, you should be able to: LO1 Describe decision theory. LO2 Outline the steps in the decision process and name some causes of poor decisions. Describe and use techniques that apply to decision making under uncertainty. Describe and use the expected-value approach. Construct a decision tree and use it to analyze a problem. Compute the expected value of perfect information. Conduct sensitivity analysis on a simple decision problem. LO3 LO4 LO5 LO6 LO7 SUPPLEMENT OUTLINE Introduction The Decision Process and Causes of Poor Decisions Decision Environments Decision Making under Certainty Decision Making under Uncertainty Decision Making under Risk Decision Trees Expected Value of Perfect Information Sensitivity Analysis 5S.1 INTRODUCTION Page 5S-2 LO1 Describe decision theory. Decision theory represents a general approach to decision making. It is suitable for a wide range of operations management decisions. Among them are capacity planning, product and service design, equipment selection, and location planning. Decisions that lend themselves to a decision theory approach tend to be characterized by the following elements: A set of possible future conditions that will have a bearing on the results of the decision. A list of alternatives for the manager to choose from. A known payoff for each alternative under each possible future condition. To use this approach, a decision maker would employ this process: 1. Identify the possible future conditions (e.g., demand will be low, medium, or high; the competitor will or will not introduce a new product). These are called states of nature. 2. Develop a list of possible alternatives, one of which may be to do nothing. 3. Determine or estimate the payoff associated with each alternative for every possible future condition. 4. If possible, estimate the likelihood of each possible future condition. 5. Evaluate alternatives according to some decision criterion (e.g., maximize expected profit), and select the best alternative. The information for a decision is often summarized in a payoff table, which shows the expected payoffs for each alternative under the various possible states of nature. These tables are helpful in choosing among alternatives because they facilitate comparison of alternatives. Consider the following payoff table, which illustrates a capacity planning problem. Possible Future Demand Alternatives Low Moderate High Small facility $10* $10 $10 Medium facility 7 12 12 Large facility (4) 2 16 *Present value in $ millions. The payoffs are shown in the body of the table. In this instance, the payoffs are in terms of present values, which represent equivalent current dollar values of expected future income less costs. This is a convenient measure because it places all alternatives on a comparable basis. If a small facility is built, the payoff will be the same for all three possible states of nature. For a medium facility, low demand will have a present value of $7 million, whereas both moderate and high demand will have present values of $12 million. A large facility will have a loss of $4 million if demand is low, a present value of $2 million if demand is moderate, and a present value of $16 million if demand is high. The problem for the decision maker is to select one of the alternatives, taking the present value into account. Evaluation of the alternatives differs according to the degree of certainty associated with the possible future conditions. 5S.2 THE DECISION PROCESS AND CAUSES OF POOR DECISIONS LO2 Outline the steps in the decision process and name some causes of poor decisions. Despite the best efforts of a manager, a decision occasionally turns out poorly due to unforeseeable circumstances. Luckily, such occurrences are not common. Often, failures can be traced to a combination of mistakes in the decision process, to bounded rationality, or to suboptimization. The decision process consists of these steps: Page 5S-3 1. Identify the problem. 2. Specify objectives and criteria for a solution. 3. Develop suitable alternatives. 4. Analyze and compare alternatives. 5. Select the best alternative. 6. Implement the solution. 7. Monitor to see that the desired result is achieved. In many cases, managers fail to appreciate the importance of each step in the decision-making process. They may skip a step or not devote enough effort to completing it before jumping to the next step. Sometimes this happens owing to a manager’s style of making quick decisions or a failure to recognize the consequences of a poor decision. The manager’s ego can be a factor. This sometimes happens when the manager has experienced a series of successes—important decisions that turned out right. Some managers then get the impression that they can do no wrong. But they soon run into trouble, which is usually enough to bring them back down to earth. Other managers seem oblivious to negative results and continue the process they associate with their previous successes, not recognizing that some of that success may have been due more to luck than to any special abilities of their own. A part of the problem may be the manager’s unwillingness to admit a mistake. Yet other managers demonstrate an inability to make a decision; they stall long past the time when the decision should have been rendered. Of course, not all managers fall into these traps—it seems safe to say that the majority do not. Even so, this does not necessarily mean that every decision works out as expected. Another factor with which managers must contend is bounded rationality, or the limits imposed on decision making by costs, human abilities, time, technology, and the availability of information. Because of these limitations, managers cannot always expect to reach decisions that are optimal in the sense of providing the best possible outcome (e.g., highest profit, least cost). Instead, they must often resort to achieving a satisfactory solution. Still another cause of poor decisions is that organizations typically departmentalize decisions. Naturally, there is a great deal of justification for the use of departments in terms of overcoming spanof-control problems and human limitations. However, suboptimization can occur. This is a result of different departments’ attempts to reach a solution that is optimum for each. Unfortunately, what is optimal for one department may not be optimal for the organization as a whole. If you are familiar with the theory of constraints (see Chapter 16), suboptimization and local optima are conceptually the same, with the same negative consequences. 5S.3 DECISION ENVIRONMENTS LO3 Describe and use techniques that apply to decision making under uncertainty. Operations management decision environments are classified according to the degree of certainty present. There are three basic categories: certainty, risk, and uncertainty. Certainty means that relevant parameters—such as costs, capacity, and demand—have known values. Risk means that certain parameters have probabilistic outcomes. Uncertainty means that it is impossible to assess the likelihood of various possible future events. Consider these situations: 1. Profit per unit is $5. You have an order for 200 units. How much profit will you make? (This is an example of certainty because unit profits and total demand are known.) 2. Profit is $5 per unit. Based on previous experience, there is a 50 percent chance of an order for 100 units and a 50 percent chance of an order for 200 units. What is expected profit? (This is an example of risk because demand outcomes are probabilistic.) 3. Profit is $5 per unit. The probabilities of potential demands are unknown. (This is an example of uncertainty.) The importance of these different decision environments is that they require different analysis techniques. Some techniques are better suited for one category than for others. 5S.4 DECISION MAKING UNDER CERTAINTY When it is known for certain which of the possible future conditions will actually happen, the decision is usually relatively straightforward: Simply choose the alternative that has the best payoff under that state of nature. Page 5S-4 Example 5S–1 illustrates this. EXAMPLE 5S–1 - Choosing an Alternative under Certainty Determine the best alternative in the payoff table on the previous page for each of the cases: It is known with certainty that demand will be (a) low, (b) moderate, (c) high. SOLUTION Choose the alternative with the highest payoff. Thus, if we know demand will be low, we would elect to build the small facility and realize a payoff of $10 million. If we know demand will be moderate, a medium factory would yield the highest payoff ($12 million versus either $10 million or $2 million). For high demand, a large facility would provide the highest payoff. Although complete certainty is rare in such situations, this kind of exercise provides some perspective on the analysis. Moreover, in some instances, there may be an opportunity to consider allocation of funds to research efforts, which may reduce or remove some of the uncertainty surrounding the states of nature, converting uncertainty to risk or to certainty. 5S.5 DECISION MAKING UNDER UNCERTAINTY At the opposite extreme is complete uncertainty: No information is available on how likely the various states of nature are. Under those conditions, four possible decision criteria are maximin, maximax, Laplace, and minimax regret. These approaches can be defined as follows: Maximin—Determine the worst possible payoff for each alternative, and choose the alternative that has the “best worst.” The maximin approach is essentially a pessimistic one because it takes into account only the worst possible outcome for each alternative. The actual outcome may not be as bad as that, but this approach establishes a “guaranteed minimum.” Maximax—Determine the best possible payoff, and choose the alternative with that payoff. The maximax approach is an optimistic, “go for it” strategy; it does not take into account any payoff other than the best. Laplace—Determine the average payoff for each alternative, and choose the alternative with the best average. The Laplace approach treats the states of nature as equally likely. Minimax regret—Determine the worst regret for each alternative, and choose the alternative with the “best worst.” This approach seeks to minimize the difference between the payoff that is realized and the best payoff for each state of nature. The next two examples illustrate these decision criteria. Page 5S-5 EXAMPLE 5S–2: Choosing an Alternative Using Maximax, Maximin, and Laplace Referring to the payoff table in the Introduction, determine which alternative would be chosen under each of the following strategies. a. Maximin b. Maximax c. Laplace SOLUTION a. Using maximin, the worst payoffs for the alternatives are as follows: Small facility: $10 million Medium facility: 7 million Large facility: –4 million Hence, because $10 million is the best, choose to build the small facility using the maximin strategy. b. Using maximax, the best payoffs are as follows: Small facility: $10 million Medium facility: 12 million Large facility: 16 million The best overall payoff is the $16 million in the third row. Hence, the maximax criterion leads to building a large facility. c. For the Laplace criterion, first find the row totals, and then divide each of those amounts by the number of states of nature (three in this case). Thus, we have Row Total (in $ millions) Row Average (in $ millions) Small facility $30 $10.00 Medium facility 31 10.33 Large facility 14 4.67 Because the medium facility has the highest average, it would be chosen under the Laplace criterion. EXAMPLE 5S–3: Choosing an Alternative Using Minimax Regret Determine which alternative would be chosen using a minimax regret approach to the capacity planning program. SOLUTION The first step in this approach is to prepare a table of regrets (opportunity losses). To do this, subtract every payoff in each column from the best payoff in that column. For instance, in the first column, the best payoff is 10, so each of the three numbers in that column must be subtracted from 10. Going down the column, the regrets will be 10 – 10 = 0, 10 – 7 = 3, and 10 – (–4) = 14. In the second column, the best payoff is 12. Subtracting each payoff from 12 yields 2, 0, and 10. In the third column, 16 is the best payoff. The regrets are 6, 4, and 0. These results are summarized in a regret table: REGRETS (IN $ MILLIONS) Alternatives Low Moderate High Worst Small facility $0 $2 $6 $6 Medium facility 3 0 4 4 Large facility 14 10 0 14 The second step is to identify the worst regret for each alternative. For the first alternative, the worst is 6; for the second, the worst is 4; and for the third, the worst is 14. The best of these worst regrets would be chosen using minimax regret. The lowest regret is 4, which is for a medium facility. Hence, that alternative would be chosen. Solved Problem 6 at the end of this supplement illustrates decision making under uncertainty when the payoffs represent costs. The main weakness of these approaches (except for Laplace) is that they do not take into account all of the payoffs. Instead, they focus on the worst or best, and so they lose some information. Still, for a given set of circumstances, each has certain merits that can be helpful to a decision maker. 5S.6 DECISION MAKING UNDER RISK LO4 Describe and use the expected-value approach. Between the two extremes of certainty and uncertainty lies the case of risk: The probability of occurrence for each state of nature is known. (Note that because the states are mutually exclusive and collectively exhaustive, these probabilities must add to 1.00.) A widely used approach under such circumstances is the expected monetary value criterion. The expected value is computed for each alternative, and the one with the best expected value is selected. The expected value is the sum of the payoffs for an alternative where each payoff is weighted by the probability for the relevant state of nature. Thus, the approach is: Expected monetary value (EMV) criterion—Determine the expected payoff of each alternative, and choose the alternative that has the best expected payoff. Page 5S-6 EXAMPLE 5S–4: Choosing an Alternative Using Expected Value Using the expected monetary value criterion, identify the best alternative for the previous payoff table for these probabilities: low = .30, moderate = .50, and high = .20. SOLUTION Find the expected value of each alternative by multiplying the probability of occurrence for each state of nature by the payoff for that state of nature and summing them: EVsmall = .30($10) + .50($10) + .20($10) = $10 EVmedium = .30($7) + .50($12) + .20($12) = $10.5 EVlarge = .30(−$4) + .50($2) + .20($16) = $3 Hence, choose the medium facility because it has the highest expected value. The expected monetary value approach is most appropriate when a decision maker is neither risk averse nor risk seeking, but is risk neutral. Typically, well-established organizations with numerous decisions of this nature tend to use expected value because it provides an indication of the long-run, average payoff. That is, the expected-value amount (e.g., $10.5 million in the last example) is not an actual payoff but an expected or average amount that would be approximated if a large number of identical decisions were to be made. Hence, if a decision maker applies this criterion to a large number of similar decisions, the expected payoff for the total will approximate the sum of the individual expected payoffs. 5S.7 DECISION TREES LO5 Construct a decision tree and use it to analyze a problem. In health care, the array of treatment options and medical costs makes tools such as decision trees particularly valuable in diagnosing and prescribing treatment plans. For example, if a 20-year-old and a 50-year-old both are brought into an emergency room complaining of chest pains, the attending physician, after asking each some questions on family history, patient history, general health, and recent events and activities, will use a decision tree to sort through the options to arrive at the appropriate decision for each patient. Decision trees are tools that have many practical applications, not only in health care but also in legal cases and a wide array of management decision making, including credit card fraud; loan, credit, and insurance risk analysis; decisions on new product or service development; and location analysis. A decision tree is a schematic representation of the alternatives available to a decision maker and their possible consequences. The term gets its name from the treelike appearance of the diagram (see Figure 5S-1). Although tree diagrams can be used in place of a payoff table, they are particularly useful for analyzing situations that involve sequential decisions. For instance, a manager may initially decide to build a small facility only to discover that demand is much higher than anticipated. In this case, the manager may then be called upon to make a subsequent decision on whether to expand or build an additional facility. FIGURE 5S-1 Format of a decision tree A decision tree is composed of a number of nodes that have branches emanating from them Page 5S-7 (see Figure 5S-1). Square nodes denote decision points, and circular nodes denote chance events. Read the tree from left to right. Branches leaving square nodes represent alternatives; branches leaving circular nodes represent chance events (i.e., the possible states of nature). After the tree has been drawn, it is analyzed from right to left; that is, starting with the last decision that might be made. For each decision, choose the alternative that will yield the greatest return (or the lowest cost). If chance events follow a decision, choose the alternative that has the highest expected monetary value (or lowest expected cost). EXAMPLE 5S–5: Choosing an Alternative Using Expected Value with a Decision Tree A manager must decide on the size of a video arcade to construct. The manager has narrowed the choices to two: large or small. Information has been collected on payoffs, and a decision tree has been constructed. Analyze the decision tree and determine which initial alternative (build small or build large) should be chosen in order to maximize expected monetary value. SOLUTION The dollar amounts at the branch ends indicate the estimated payoffs if the sequence of chance events and decisions that is traced back to the initial decision occurs. For example, if the initial decision is to build a small facility and it turns out that demand is low, the payoff will be $40 (thousand). Similarly, if a small facility is built, demand turns out to be high, and a later decision is made to expand, the payoff will be $55 (thousand). The figures in parentheses on branches leaving the chance nodes indicate the probabilities of those states of nature. Hence, the probability of low demand is .4, and the probability of high demand is .6. Payoffs in parentheses indicate losses. Analyze the decisions from right to left: 1. Determine which alternative would be selected for each possible second decision. For a small facility with high demand, there are three choices: do nothing, work overtime, and expand. Because expand has the highest payoff, you would choose it. Indicate this by placing a double slash through each of the other alternatives. Similarly, for a large facility with low demand, there are two choices: do nothing and reduce prices. You would choose reduce prices because it has the higher expected value, so a double slash is placed on the other branch. 2. Determine the product of the chance probabilities and their respective payoffs for the remaining branches: Build small Low demand .4($40) = $16 High demand .6($55) = $33 $49 Build large Low demand .4($50) = $20 High demand .6($70) = $42 $62 3. Hence, the choice should be to build the large facility because it has a larger expected value than the small facility. 5S.8 EXPECTED VALUE OF PERFECT INFORMATION Page 5S-8 LO6 Compute the expected value of perfect information. In certain situations, it is possible to ascertain which state of nature will actually occur in the future. For instance, the choice of location for a restaurant may weigh heavily on whether a new highway will be constructed or whether a zoning permit will be issued. A decision maker may have probabilities for these states of nature; however, it may be possible to delay a decision until it is clear which state of nature will occur. This might involve taking an option to buy the land. If the state of nature is favorable, the option can be exercised; if it is unfavorable, the option can be allowed to expire. The question to consider is whether the cost of the option will be less than the expected gain due to delaying the decision (i.e., the expected payoff above the expected value). The expected gain is the expected value of perfect information (EVPI). Other possible ways of obtaining perfect information depend somewhat on the nature of the decision being made. Information about consumer preferences might come from market research, additional information about a product could come from product testing, or legal experts might be called on. There are two ways to determine the EVPI. One is to compute the expected payoff under certainty and subtract the expected payoff under risk. That is, (5S-1) Expected perf ect value of inf ormation = Expected under payof f certainty − Expected under payof f risk EXAMPLE 5S–6: Computing the Expected Value of Perfect Information Using Formula 5S-1 Using the information from Example 5S–4, determine the expected value of perfect information using Formula 5S-1. SOLUTION First, compute the expected payoff under certainty. To do this, identify the best payoff under each state of nature. Then, combine these by weighting each payoff by the probability of that state of nature and adding the amounts. Thus, the best payoff under low demand is $10, the best under moderate demand is $12, and the best under high demand is $16. The expected payoff under certainty is then .30($10) + .50($12) + .20($16) = $12.2 The expected payoff under risk, as computed in the difference between these: EVPI = Example 5S–4, is $10.5. The EVPI is $12.2 − $10.5 = $1.7 This figure indicates the upper limit on the amount the decision maker should be willing to spend to obtain perfect information in this case. Thus, if the cost equals or exceeds this amount, the decision maker would be better off not spending additional money and simply going with the alternative that has the highest expected payoff. A second approach is to use the regret table to compute the EVPI. To do this, find the expected regret for each alternative. The minimum expected regret is equal to the EVPI. EXAMPLE 5S–7: Computing the Expected Value of Perfect Information Using Expected Regret Determine the expected value of perfect information for the capacity-planning problem using the expected regret approach. SOLUTION Using information from Examples 5S–2, expected regret for each alternative. Thus: 5S–3, and Small facility .30(0) + .50(2) + .20(6) = 2.2 Medium facility .30(3) + .50(0) + .20(4) = 1.7 [minimum] Large facility .30(14) + .50(10) + .20(0) = 9.2 5S–4, we can compute the The lowest expected regret is 1.7, which is associated with the second alternative. Hence, the EVPI is $1.7 million, which agrees with the previous example using the other approach. 5S.9 SENSITIVITY ANALYSIS Page 5S-9 LO7 Conduct sensitivity analysis on a simple decision problem. Generally speaking, both the payoffs and the probabilities in this kind of a decision problem are estimated values. Consequently, it can be useful for the decision maker to have some indication of how sensitive the choice of an alternative is to changes in one or more of these values. Unfortunately, it is impossible to consider all possible combinations of every variable in a typical problem. Nevertheless, there are certain things a decision maker can do to judge the sensitivity of probability estimates. Sensitivity analysis provides a range of probability over which the choice of alternatives would remain the same. The approach illustrated here is useful when there are two states of nature. It involves constructing a graph and then using algebra to determine a range of probabilities for which a given solution is best. In effect, the graph provides a visual indication of the range of probability over which the various alternatives are optimal, and the algebra provides exact values of the endpoints of the ranges. Example 5S–8 illustrates the procedure. EXAMPLE 5S–8: Finding Optimal Probability Ranges for the Expected Value Approach Given the following table, determine the range of probability for state of nature #2—that is, P(2), for which each alternative is optimal under the expected-value approach. STATE OF NATURE Alternative SOLUTION #1 #2 A 4 12 B 16 2 C 12 8 First, plot each alternative relative to P(2). To do this, plot the #1 value on the left side of the graph and the #2 value on the right side. For instance, for alternative A, plot 4 on the left side of the graph and 12 on the right side. Then, connect these two points with a straight line. The three alternatives are plotted on the graph below. The graph shows the range of values of P(2) over which each alternative is optimal. Thus, for low values of P(2) [and thus high values of P(1), since P(1) + P(2) = 1.0], alternative B will have the highest expected value; for intermediate values of P(2), alternative C is best; and for higher values of P(2), alternative A is best. To find exact values of the ranges, determine where the upper parts of the lines intersect. Note that at the intersections, the two alternatives represented by the lines would be equivalent in terms of expected value. Hence, the decision maker would be indifferent between the two at that point. To determine the intersections, you must obtain the equation of each line. This is relatively simple to do. Because these are straight lines, they have the form y = a + bx, where a is the y-intercept value at the left axis, b is the slope of the line, and x is P(2). Slope is defined as the change in y for a one-unit change in x. In this type of problem, the distance between the two vertical axes is 1.0. Consequently, the slope of each line is equal to the right-hand value minus the left-hand value. The slopes and equations are as follows: Page 5S-10 #1 #2 Slope Equation A 4 12 12 – 4 = + 8 4 + 8P(2) B 16 2 2 – 16 = –14 16 – 14P(2) C 12 8 8 – 12 = –4 12 – 4P(2) From the graph, we can see that alternative B is best from P(2) = 0 to the point where that straight line intersects the straight line of alternative C, and that begins the region where C is better. To find that point, solve for the value of P(2) at their intersection. This requires setting the two equations equal to each other and solving for P(2). Thus, 16 – 14P (2) = 12 – 4P (2) Rearranging terms yields 4 = 10P (2) Solving yields P(2) = .40. Thus, alternative B is best from P(2) = 0 up to P(2) = .40. B and C are equivalent at P(2) = .40. Alternative C is best from that point until its line intersects alternative A’s line. To find that intersection, set those two equations equal and solve for P(2). Thus, 4 + 8P (2) = 12 – 4P (2) Rearranging terms results in 12P (2) = 8 Solving yields P(2) = .67. Thus, alternative C is best from P(2) > .40 up to P(2) = .67, where A and C are equivalent. For values of P(2) greater than .67 up to P(2) = 1.0, A is best. Note: If a problem calls for ranges with respect to P(1), find the P(2) ranges as above, and then subtract each P(2) from 1.00 (e.g., .40 becomes .60, and .67 becomes .33). SUMMARY Decision making is an integral part of operations management. Decision theory is a general approach to decision making that is useful in many different aspects of operations management. Decision theory provides a framework for the analysis of decisions. It includes a number of techniques that can be classified according to the degree of uncertainty associated with a particular decision problem. Two visual tools useful for analyzing some decision problems are decision trees and graphical sensitivity analysis. KEY TERMS bounded rationality certainty decision tree expected monetary value (EMV) criterion expected value of perfect information (EVPI) Laplace maximax maximin minimax regret payoff table regrets (opportunity loss) risk sensitivity analysis suboptimization uncertainty SOLVED PROBLEMS The following Solved Problems refer to this payoff table: Alternative capacity for new store Page 5S-11 New Bridge Built No New Bridge A 1 14 B 2 10 C 4 6 where A = small, B = medium, and C = large. Problem 1 Assume the payoffs represent profits. Determine the alternative that would be chosen under each of the following decision criteria. a. Maximin b. Maximax c. Laplace Solution New Bridge No New Bridge Maximin (worst) Maximax (best) Laplace (average) A 1 14 1 14 [best] 15 ÷ 2 = 7.5 [best] B 2 10 2 10 12 ÷ 2 = 6 C 4 6 4 [best] 6 10 ÷ 2 = 5 Thus, the alternatives chosen would be C under maximin, A under maximax, and A under Laplace. Problem 2 Using graphical sensitivity analysis, determine the probability for no new bridge for which each alternative would be optimal. Solution Plot a straight line for each alternative. Do this by plotting the payoff for new bridge on the left axis and the payoff for no new bridge on the right axis and then connecting the two points. Each line represents the expected profit for an alternative for the entire range of probability of no new bridge. Because the lines represent expected profit, the line that is highest for a given value of P (no new bridge) is optimal. Thus, from the graph, you can see that for low values of this probability, alternative C is best, and for higher values, alternative A is best (B is never the highest line, so it is never optimal). The dividing line between the ranges where C and A are optimal occurs where the two lines intersect. To find that probability, first formulate the equation for each line. To do this, let the intersection with the left axis be the y intercept; the slope equals the right-side payoff minus the left-side payoff. Thus, for C you have 4 + (6 – 4)P, which is 4 + 2P. For A, 1 + (14 – 1)P, which is 1 + 13P. Setting these two equal to each other, you can solve for P: Page 5S-12 4 + 2P = 1 + 13P Solving, P = .27. Therefore, the ranges for P(no new bridge) are A: .27 < P ≤ 1.00 B: never optimal C: 0 ≤ P < .27 Problem 3 Using the information in the payoff table, develop a table of regrets, and then: a. Determine the alternative that would be chosen under minimax regret. b. Determine the expected value of perfect information using the regret table, assuming that the probability of a new bridge being built is .60. Solution To obtain the regrets, subtract all payoffs in each column from the best payoff in the column. The regrets are New Bridge No New Bridge A 3 0 B 2 4 C 0 8 a. Minimax regret involves finding the worst regret for each alternative and then choosing the alternative that has the “best” worst. Thus, you would choose A: Worst A 3 [best] Worst B 4 C 8 b. Once the regret table has been developed, you can compute the EVPI as the smallest expected regret. Because the probability of a new bridge is given as .60, we can deduce that the probability of no new bridge is 1.00 – .60 = .40. The expected regrets are A: .60(3) + .40(0) = 1.80 B: .60(2) + .40(4) = 2.80 C: .60(0) + .40(8) = 3.20 Hence, the EVPI is 1.80. Problem 4 Using the probabilities of .60 for a new bridge and .40 for no new bridge: a. Compute the expected value of each alternative in the payoff table, and identify the alternative that would be selected under the expected-value approach. b. Construct a decision tree for the problem showing expected values. Solution a. A: .60(1) + .40(14) = 6.20 [best] B: .60(2) + .40(10) = 5.20 C: .60(4) + .40(6) = 4.80 b. Page 5S-13 Problem 5 Compute the EVPI using the information from the previous problem. Solution Formula 5S-1, the EVPI is the expected payoff under certainty minus the Using maximum expected value. The expected payoff under certainty involves multiplying the best payoff in each column by the column probability and then summing those amounts. The best payoff in the first column is 4, and the best in the second is 14. Thus, Expected payof f under certainty = .60(4) + .40(14) = 8.00 Then EVP = 8.00 − 6.20 = 1.80 (This agrees with the result obtained in Solved Problem 3b.) Excel solution: Page 5S-14 Source: Microsoft Corporation Placing the problem data in the cell positions shown, the expected monetary value (EMV) for each alternative is shown in column J. Then, the overall EMV is obtained in column L as the maximum of the values in L5, L6, and L7. The EVPI is obtained using the Opportunity Loss Table as the minimum EOL value in J14, J15, and J16. Problem 6 Suppose that the values in the payoff table represent costs instead of profits. a. Determine the choice you would make under each of these strategies: maximin, minimin, and Laplace.* b. Develop the regret table, and identify the alternative chosen using minimax regret. Then, find the EVPI if P(new bridge) = .60. c. Using sensitivity analysis, determine the range of P(no new bridge) for which each alternative would be optimal. d. If P(new bridge) = .60 and P(no new bridge) = .40, find the alternative chosen to minimize expected cost. *Minimin is the reverse of maximax; for costs, minimin identifies the lowest (best) cost. Solution a. Page 5S-15 New Bridge No New Bridge Maximin (worst) Minimin (best) Laplace (average) A 1 14 14 1 [best] 15 ÷ 2 = 7.5 B 2 10 10 2 12 ÷ 2 = 6 C 4 6 6 [best] 4 10 ÷ 2 = 5 [best] b. Develop the regret table by subtracting the lowest cost in each column from each of the values in the column. (Note that none of the values is negative.) New Bridge No New Bridge Worst A 0 8 8 B 1 4 4 C 3 0 3 [best] New Bridge No New Bridge Worst EVPI = .60(3) + .40(0) = 1.80 c. The graph is identical to that shown in Solved Problem 2. However, the lines now represent expected costs, so the best alternative for a given value of P(no new bridge) is the lowest line. Hence, for very low values of P(no new bridge), A is best; for intermediate values, B is best; and for high values, C is best. You can set the equations of A and B, and B and C, equal to each other in order to determine the values of P(no new bridge) at their intersections. Thus, A = B: 1 + 13P = 2 + 8P ; solving, P = .20 B = C: 2 + 8P = 4 + 2P ; solving, P = .33 Hence, the ranges are A best: 0 ≤ P < .20 B best: .20 < P < .33 C best: .33 < P ≤ 1.00 d. Expected-value computations are the same whether the values represent costs or profits. Hence, the expected payoffs for costs are the same as the expected payoffs for profits that were computed in Solved Problem 4. However, now you want the alternative that has the lowest expected payoff rather than the one with the highest payoff. Consequently, alternative C is the best because its expected payoff is the lowest of the three. Alternatively, the best choice (C) could be determined using the sensitivity ranges found in part c because .40 lies in the range .33 to 1.0. DISCUSSION AND REVIEW QUESTIONS LO1 1. What is the chief role of the operations manager? 2. List the steps in the decision-making process. LO1 LO2 3. Explain the term bounded rationality. 4. Explain the term suboptimization. Page 5S-16 LO2 5. What are some of the reasons for poor decisions? LO2 6. What information is contained in a payoff table? LO1 7. What is sensitivity analysis, and how can it be useful to a decision maker? LO7 8. Contrast maximax and maximin decision strategies. Under what circumstances is each appropriate? LO3 9. Under what circumstances is expected monetary value appropriate as a decision criterion? When isn’t it appropriate? LO7 10. Explain or define each of the following terms. LO3 , LO4 , LO6 a. Laplace criterion b. Minimax regret c. Expected value d. Expected value of perfect information 11. What information does a decision maker need in order to perform an expected-value analysis of a problem? What options are available to the decision maker if the probabilities of the states of nature are unknown? Can you think of a way you might use sensitivity analysis in such a case? LO4 12. Suppose a manager is using maximum EMV as a basis for making a capacity decision and, in the process, obtains a result in which there is a virtual tie between two of the seven alternatives. How is the manager to make a decision? LO4 PROBLEMS 1. A small building contractor has recently experienced two successive years in Page 5S-17 which work opportunities exceeded the firm’s capacity. The contractor must now make a decision on capacity for next year. Estimated profits under each of Page 5S-18 the two possible states of nature are as shown in the table below. Which alternative should be selected if the decision criterion is: Page 5S-19 LO3 a. Maximax? b. Maximin? c. Laplace? d. Minimax regret? NEXT YEAR’S DEMAND Alternative Low High Do nothing $50* $60 Expand 20 80 Subcontract 40 70 *Profit in $ thousands. 2. Refer to Problem 1. Suppose after a certain amount of discussion, the contractor is able to subjectively assess the probabilities of low and high demand: P(low) = .3 and P(high) = .7. LO4 , LO5 , LO6 a. Determine the expected profit of each alternative. Which alternative is best? Why? b. Analyze the problem using a decision tree. Show the expected profit of each alternative on the tree. c. Compute the expected value of perfect information. How could the contractor use this knowledge? 3. Refer to Problems 1 and 2. Construct a graph that will enable you to perform sensitivity analysis on the problem. Over what range of P(high) would the alternative of doing nothing be best? Expand? Subcontract? LO7 4. A firm that plans to expand its product line must decide whether to build a small or a large facility to produce the new products. If it builds a small facility and demand is low, the net present value after deducting for building costs will be $400,000. If demand is high, the firm can either maintain the small facility or expand it. Expansion would have a net present value of $450,000, and maintaining the small facility would have a net present value of $50,000. If a large facility is built and demand is high, the estimated net present value is $800,000. If demand turns out to be low, the net present value will be –$10,000. The probability that demand will be high is estimated to be .60, and the probability of low demand is estimated to be .40. LO5 , LO6 , LO7 a. Analyze using a tree diagram. b. Compute the EVPI. How could this information be used? c. Determine the range over which each alternative would be best in terms of the value of P (demand low). 5. Determine the course of action that has the highest expected payoff for this decision tree. LO5 *Net present value in millions 6. The lease of Theme Park, Inc., is about to expire. Management must decide whether to renew the lease for another 10 years or to relocate near the site of a proposed motel. The town planning board is currently debating the merits of granting approval to the motel. A consultant has estimated the net present value of Theme Park’s two alternatives under each state of nature as shown on the following page. What course of action would you recommend using? a. Maximax b. Maximin LO3 c. Laplace d. Minimax regret Options Motel Approved Motel Rejected Renew $ 500,000 $4,000,000 Relocate 5,000,000 100,000 7. Refer to Problem 6. Suppose that the management of Theme Park, Inc., has decided that there is a .35 probability that the motel’s application will be approved. LO5 , LO4 , LO6 a. If management uses maximum expected monetary value as the decision criterion, which alternative should it choose? b. Represent this problem in the form of a decision tree. c. If management has been offered the option of a temporary lease while the town planning board considers the motel’s application, would you advise management to sign the lease? The lease will cost $24,000. 8. Construct a graph that can be used for sensitivity analysis for Problem 7. LO7 a. How sensitive is the solution to the problem in terms of the probability estimate of .35? b. Suppose that, after consulting with a member of the town planning board, management decides that an estimate of approval is approximately .45. How sensitive is the solution to this revised estimate? Explain. c. Suppose the management is confident of all the estimated payoffs except for $4 million. If the probability of approval is .35, for what range of payoff for renew/reject will the alternative selected using the maximum expected value remain the same? 9. A firm must decide whether to construct a small, medium, or large stamping plant. A consultant’s report indicates a .20 probability that demand will be low and an .80 probability that demand will be high. LO5 , LO6 , LO7 If the firm builds a small facility and demand turns out to be low, the net present value will be $42 million. If demand turns out to be high, the firm can either subcontract and realize the net present value of $42 million or expand greatly for a net present value of $48 million. The firm could build a medium-size facility as a hedge: If demand turns out to be low, its net present value is estimated at $22 million; if demand turns out to be high, the firm could do nothing and realize a net present value of $46 million, or it could expand and realize a net present value of $50 million. If the firm builds a large facility and demand is low, the net present value will be –$20 million, whereas high demand will result in a net present value of $72 million. a. Analyze this problem using a decision tree. b. What is the maximin alternative? c. Compute the EVPI and interpret it. d. Perform sensitivity analysis on P(high). 10. A manager must decide how many machines of a certain type to buy. The machines will be used to manufacture a new gear for which there is increased demand. The manager has narrowed the decision to two alternatives: buy one machine or buy two. If only one machine is purchased and demand is more than it can handle, a second machine can be purchased at a later time. However, the cost per machine would be lower if the two machines were purchased at the same time. The estimated probability of low demand is .30, and the estimated probability of high demand is .70. The net present value associated with the purchase of two machines initially is $75,000 if demand is low and $130,000 if demand is high. The net present value for one machine and low demand is $90,000. If demand is high, there are three options. One option is to do nothing, which would have a net present value of $90,000. A second option is to subcontract; that would have a net present value of $110,000. The third option is to purchase a second machine. This option would have a net present value of $100,000. LO5 How many machines should the manager purchase initially? Use a decision tree to analyze this problem. 11. Determine the course of action that has the highest EMV for the accompanying tree diagram. LO5 12. A logistics provider plans to have a new warehouse built to handle increasing demands for its services. Although the company is unsure of how much demand there will be, it must decide now on the size (large or small) of the warehouse. Preliminary estimates are that if a small warehouse is built and demand is low, the monthly income will be $700,000. If demand is high, it will have to either expand the facility or lease additional space. Leasing will result in a monthly income of $100,000, while expanding will result in a monthly income of $500,000. LO3 , LO5 If a large warehouse is built and demand is low, monthly income will only be $40,000, while if demand is high, monthly income will be $2 million. a. Construct a tree diagram for this decision. b. Using your tree diagram, identify the choice that would be made using each of the four approaches for decision making under uncertainty. 13. The director of social services of a county has learned that the state has mandated additional information requirements. This will place an additional burden on the agency. The director has identified three acceptable alternatives to handle the increased workload. One alternative is to reassign present staff members, the second is to hire and train two new workers, and the third is to redesign current practice so that workers can readily collect the information with little additional effort. An unknown factor is the caseload for the coming year when the new data will be collected on a trial basis. The estimated costs for various options and caseloads are shown in the following table. CASELOAD Moderate High Very High Reassign staff $50* 60 85 New staff 60 60 60 Redesign collection 40 50 90 *Cost in $ thousands. Assuming that past experience has shown the probabilities of various caseloads to be unreliable, what decision would be appropriate using each of the following criteria? LO3 a. Maximin b. Maximax c. Minimax regret d. Laplace 14. After contemplating the caseload question (see Problem 13), the director of social services has decided that reasonable caseload probabilities are .10 for moderate, .30 for high, and .60 for very high. LO4 , LO5 , LO6 a. Which alternative will yield the minimum expected cost? b. Construct a decision tree for this problem. Indicate the expected costs for the three decision branches. c. Determine the expected value of perfect information using an opportunity loss table. 15. Given this payoff table: LO7 STATE OF NATURE Alternative #1 #2 A $120* 20 B 60 40 C 10 110 D 90 90 *Payoff in $ thousands. a. Determine the range of P(1) for which each alternative would be best, treating the payoffs as profits. b. Answer part a treating the payoffs as costs. 16. A manager has compiled estimated profits for various capacity alternatives but is reluctant to assign probabilities to the states of nature. The payoff table is as follows: LO7 STATE OF NATURE Alternative #1 #2 A $20* 140 B 120 80 C 100 40 *Profit in $ thousands. a. Plot the expected-value lines on a graph. b. Is there any alternative that would never be appropriate in terms of maximizing expected profit? Explain on the basis of your graph. c. For what range of P(2) would alternative A be the best choice if the goal is to maximize expected profit? d. For what range of P(1) would alternative A be the best choice if the goal is to maximize expected profit? 17. Repeat all parts of Problem 16, assuming the values in the payoff table are estimated costs and the goal is to minimize expected costs. LO7 18. The research staff of a marketing agency has assembled the following payoff table of estimated profits: Relative to the probability of not receiving the contract, determine the range of probability for which each of the proposals would maximize expected profit. Proposal LO7 Receive Contract Not Receive Contract #1 $10* −2 #2 8 3 #3 5 5 #4 0 7 *Cost in $ thousands. MINI-CASES Page 5S-20 MINI-CASE Southern Company Fleet managers have a large pool of cars and trucks to maintain. One approach to the vehicle maintenance is to use periodic oil analysis: to do this, the oil from the engine and transmission are subjected periodically to a test. These tests can sometimes signal an impending failure (for example, iron particles in the oil), and preventive maintenance is then performed (at a relatively low cost), eliminating the risk of failure (failure would result in a relatively high cost). However, oil analysis costs money and it is not always perfect—it can indicate that a unit is defective when in fact it is not, and it can indicate that a unit is nondefective when in fact it is. As a possible substitute for oil analysis, the company could simply change the oil periodically, thereby reducing the probability of failure. The fleet manager for the Southern Company, a gas and electric utility holding company based in Atlanta, has four alternatives when it comes to diagnostics and maintenance of its fleet: (1) do nothing, (2) use oil analysis only, (3) oil change periodically only, or (4) oil change and do oil analysis. For option (1) the probability of failure is 0.1, and the cost of failure is $1,200. For option (2), the probability of failure remains at 0.1. However, if the unit is about to fail, the oil analysis will indicate this with probability 0.7; if the unit is not about to fail, the oil analysis will indicate this (that the unit is healthy) with probability 0.8. The oil analysis itself costs $20, and if it indicates that failure is about to occur, the oil will be changed at the cost of $14.80 and preventive maintenance will be performed. The cost of preventive maintenance to restore a unit that is about to fail is $500, whereas the cost of maintenance for a unit that is not about to fail is $250. For options (3) and (4), probability of failure decreases from 0.1 to 0.04. Analyze this decision problem. Question Using a decision tree, which alternative should the fleet manager for the Southern Company choose? MINI-CASE R&D Project A chemical company discovered a new but unpatentable application for a chemical agent to reduce pulp-mill water pollution. However, everything was quite uncertain, and the management was trying to decide whether to go ahead with its R&D or abandon the product. The following questions indicate the primary risks: Would market tests confirm that there is a significant market for the product and could the company develop a new process for making this product—that is, is it technically feasible? After a production process is developed, would the company’s board sanction production on a commercial scale? Would the venture turn out to be commercially successful? The probabilities of an affirmative answer to the above questions are shown below. The plus-or-minus values indicate management’s uncertainty about the true probabilities. For example, the probability that the venture turns out to be successful is 0.8± 0.2. This means that based on the best estimate, there is an 80 percent chance that it would be successful. However, in best or worst case scenarios, this probability is estimated to be 100 percent and 60 percent, respectively. Significant market and technical feasibility (P1) 0.36 ± 0.09 Board sanctions plant (P2) 0.8 ± 0.2 Commercial success (P3) 0.8 ± 0.2 The primary economic factors and their expense/gain (in million dollars) were the following: The marketing development cost to determine whether there is a significant market, and research expenses to identify a new production process for the product (C1): $1 ± 25% The process development costs, including pre-sanction engineering and commercial development (C2): $3.5 ± 25% The commercial development costs after the board’s sanction (C3): $1.0 ± 25% The venture value (net present value) if successful (R): $25 ± 50% The plus-or-minus values indicate management’s considerable uncertainty about the values. For example, the commercial development cost after the board’s sanction is estimated at $1.0 ± 25%. This means, based on the best estimate, this value will be $1M, but in best or worst case scenarios, the value is estimated to be $1.25M and $0.75M, respectively. Questions 1. Should management go ahead with R&D for this product? Address the problem using a decision tree by both using best estimate values (probabilities and gain/expenses), as well as in worst-case scenario (probabilities and gain/expenses). 2. (bonus) You can use simulation to acquire a risk profile for this venture. Using simulation (see Chapter 18S) generate 1,000 simulated scenarios by creating 1,000 set of random numbers for the probability and expense/gain values assuming uniform distribution for all of these variables. Using the random numbers, find the proportion of cases (out of the simulated 1,000 cases) that result in a negative expected profit. Based on your simulated results, would you recommend going ahead with this venture? CHAPTER 6 Process Design and Facility Layout Page 206 Jim West/Alamy Stock Photo LEARNING OBJECTIVES After completing this chapter, you should be able to: LO1 LO2 LO3 LO4 LO5 LO6 Explain the strategic importance of process selection and the influence it has on the organization and its supply chain. Describe the five basic process types, compare them, and discuss how to select one. Explain production and service automation, including green technologies. Describe methodology for production process design, service design, and how to draw a process map. Discuss types of facility layout, including process, product, fixed position, and hybrid (cellular and flexible manufacturing system) layout. Explain how to balance an assembly line. LO7 Develop simple process (functional) layouts. Ford Motor company has three vehicle assembly and engine manufacturing plants, two research and development sites, two parts distribution centres, and three connectivity and innovation centres in Canada.1 Ford F150 had been the best selling vehicle in North America for decades, so Ford did not have to change it much. Nevertheless, in order to reduce its weight and increase its fuel mileage, Ford took a big chance in 2015 by changing many of its body panels, including the cargo bed, from steel to high-strength aluminum. The 700 pound weight reduction was approximately 15 percent of the total weight of F150. Ford decided to insource many of the stampings to control the production quality. This required new press lines. Also, aluminum has a much lower melting point than steel and therefore cannot be spot welded consistently. Just like aircraft (which are made of aluminum), the new F150 required 2,000 rivets (instead of 5,000 spot welds) to join the pieces together. This required robots that rivet instead of weld. Ford decided to replace the hundreds of old floor-mounted spot-welding robots with 500 six-axis smaller robots that are mounted on overhead rails. In addition, for assembling the roof of the new F-150, laser welding is being used. According to the chief engineer for body construction, “Without welding guns, the plant is now quieter and cleaner, and we don’t have to worry about all the welding sparks and splatter.” Besides self-piercing rivets, Ford uses flow-drill screws when there is limited access to the back side of a panel. Also, more than 350 feet of structural adhesive is used throughout the F150 body to add strength and block noise and moisture. The factory changeover took five years to plan and only one month to implement on a fast-track basis, and cost over a billion dollars. Also, aluminum supplier Alcoa had to find a new way to mass-produce stronger but more formable aluminum sheets. Another supplier was selected to recycle aluminum scraps. 6.1 Introduction All work in organizations is performed as part of some process. A process is a sequence of Page 207 activities, usually performed by more than one person, that achieves a desired result. Processes convert inputs into outputs; they are at the core of operations management. Process selection has operational and supply chain implications. Operational implications include equipment and labour requirements, operations costs, and both the ability to meet demand and the ability to respond to variations in demand. Supply chain implications relate to the volume and variety of inputs and outputs and the degree of flexibility that is required. Technology is often a factor in process selection and layout. Three aspects of technology can be factors: product technology, processing technology, and information technology. Process selection, technology/automation, process design, and facility layout (i.e., the arrangement of the workplace) are closely tied, and for that reason these four topics are presented in a single chapter. The first part of this chapter covers basic production process types, technology/automation, and process design methodology, whereas the second part is devoted to types of layout, assembly-line balancing, and designing process (functional) layouts. 6.2 Process Selection LO1 Explain the strategic importance of process selection and the influence it has on the organization and its supply chain. Process selection refers to deciding on the way production of goods or services will be organized. It has major implications for capacity planning, layout of facilities, equipment, and design of work systems. Process selection occurs as a matter of course when new products or services are being planned. However, it also occurs periodically due to technological changes in products or equipment, as well as competitive pressures. Figure 6-1 provides an overview of where process selection and capacity planning fit into system design. Forecasts, product and service design, and technological considerations all influence capacity planning and process selection. Moreover, capacity and process selection are interrelated, and are often done in concert. They, in turn, affect facility and equipment choices, layout, and work design. FIGURE 6-1 Process selection and capacity planning influence system design. The impact of process selection goes beyond operations management: It affects the entire organization and its ability to achieve its mission, and it affects the organization’s supply chain. So, process selection choices very often have strategic significance. Different process types have different capacity ranges, and once a process type is functioning, changing it can be difficult, time consuming, and costly. Obviously, long-term forecasts, as well as an organization’s mission and goals, are important in developing a process strategy. How an organization approaches process selection is determined by the organization’s process strategy. Key aspects include: Capital intensity. The mix of equipment and labour that will be used by the organization. Process flexibility. The degree to which the system can be adjusted to changes in processing requirements due to such factors as changes in product or service design, changes in volume processed, and changes in technology. In practice, decision makers choose flexible systems for either of two reasons: demand variety or uncertainty exists about demand. The second reason can be overcome through improved forecasting. Page 208 The first step in production/service process selection is to consider whether to make or buy some or all of a product or a segment of the production/service process. If a decision is made to make a part/product or a segment of the production/service process, this requires the company to produce the part/product or perform that segment of the production/service process in-house. Every production/service process is different because the choice of operations depends on the material used and the product’s shape, size, quantity, and variety. Process choice is demand-driven. The two key questions in process selection are: 1. How much variety will the process need to be able to handle? 2. How much volume will the process need to be able to handle? Answers to these questions will serve as a guide to selecting an appropriate process. Usually, volume and variety are inversely related: A higher level of one means a lower level of the other. However, the need for flexibility of personnel and equipment is directly related to the level of variety the process will need to handle: The lower the variety, the less the need for flexibility, while the higher the variety, the greater the need for flexibility. Another aspect of variety is important. Variety means either (1) having separate operations for each product or service, with a steady demand for each, or (2) having to get equipment ready every time there is the need to change the product being produced or the service being provided. Process Types LO2 Describe the five basic process types, compare them, and discuss how to select one. There are five basic process types: job shop, batch, repetitive, continuous, and project. Job Shop A job shop process is used when a low quantity of high-variety customized goods or services will be needed. The process is intermittent; work shifts from one small job to the next, each with somewhat different requirements. High flexibility of equipment and skilled workers are important characteristics of a job shop. A manufacturing example of a job shop is the process used by a custom spring maker that is able to produce one-of-a-kind springs. A service example is the process used in the surgery department of a hospital that is able to perform a variety of procedures. A job shop process: A hospital medical team performs a diagnostic procedure. Wavebreak Media LTD/age fotostock The managerial challenges in a job shop are managing materials, managing the inventory of work in process (WIP), and scheduling the jobs so that the due dates are met and the resources are utilized as much as possible. Page 209 See the “Job Shop Manufacturing Process at Hi-Bek Precision Spring Company” OM in Action for an exampleof a job shop process. OM in ACTION Job Shop Manufacturing Process at Hi-Bek Precision Spring Company Hi-Bek Precision Spring company is a small job shop located in the centre of Hamilton, Ontario. This company produces custom springs for a variety of distributors and manufacturers. Each spring requires a unique design. Production on a given job begins with the setup of the appropriate machine. Coiling machines can be custom configured for specific jobs and can be set to wind springs at varying speeds, depending on the level of quality required. Springs are transported directly from the coiling machine to the oven where the steel is heated to temper it, giving the spring its tension (or its bounce, in the case of compression springs). Different springs require different temperatures and a different length of time in the oven. In the simplest jobs, after cooling, the springs can be packaged and arranged for shipping. In most cases, however, there are additional steps both before and after firing in the furnace. The layout of the shop is shown in the following diagram on the left and the production process for three types of springs on the right. The colours and icons correspond to the departments of the shop. Job A is the type of compression spring used inside a ballpoint pen. Here, after the coiling machine is set up, the springs are wound, then heat-treated in the furnace and shipped to the customer. Job B is a typical machine spring, which undergoes the same basic steps as the ballpoint pen spring, but has its ends ground and is coated with oil in the finishing stage to add durability to the spring before shipping. Job C is Jolly Jumper® springs. In this case, the coiling machine requires a special setup, because the Jolly Jumper® springs require tapered ends. After this, each spring must be precision adjusted to give it a specially looped end. It is heat treated, but before shipping is sent to an outside company to be electroplated. The springs then are returned to Hi-Bek and are shipped to the customer. Batch Batch process is used when a moderate quantity/volume and variety of goods or services is desired, and a batch (lot) is made at a time. The equipment need not be as flexible as in a job shop, but the process is still intermittent. The skill level of workers doesn’t need to be as high as in a job shop because there is less variety in the jobs. Manufacturing examples of batch process include the process used by small bakeries that make bread, cakes, or cookies in batches; large restaurants that make batches of dishes and desserts; breweries; and clothing manufacturers. Other examples of products that lend themselves to batch production are paint, ice cream, soft drinks, beer, magazines, and books. Service examples include movie theatres that show a movie to a group (batch) of people, and airlines that carry a planeload (batch) of people from airport to airport. Other examples of services include plays, concerts, music videos, radio and television programs, and public address announcements. A bakery batch process: Baking a large number of loaves of bread at the same time. Juice Images/Glow Images The managerial challenge in a batch process is scheduling batches in order to meet planned production and demand while utilizing the resources at a high level. Capacity issues and technology management are more important than in job shops. Page 210 Repetitive When higher quantities of more standardized goods or services are needed and each unit follows the same production sequence, repetitive process is used. The standardized output means only slight flexibility of equipment is needed. Skill of workers is generally low. Examples of this type of process include a production line and an assembly line. A production line is a sequence of machines/workstations that perform operations on a part/product. An assembly line is a production line where parts are added to a product sequentially. The line can be either machine-paced (same speed) or worker-paced (variable speed). Familiar products made by this type of process include automobiles, trucks, motorcycles, television sets, and computers. Examples of repetitive service include automatic car washes, cafeteria lines, and ticket collectors at sports events and concerts. Also, mass customization is an option. A repetitive process: Motorcycles on an assembly line with parts added in a sequential order. Cynthia Lee/Alamy Stock Photo The managerial challenges in a production/assembly line are capacity balance, technology management, quality, and materials management. See the Action for an example. “Paccar Trucks Assembly Plant” OM in OM in ACTION Paccar Trucks Assembly PlantA Paccar Trucks builds some of its high-end Kenworth and Peterbilt medium- and heavyduty trucks at its 360,000 sq. ft assembly plant in Sainte-Thérèse, Quebec. A truck has two major subassemblies: chassis and cab. The chassis is made up of the bottom frame, the engine and power train, wheels, etc. The Quebec plant receives its engines from Paccar’s U.S. engine plants and Paccar buys the other major components from its suppliers. The cab and hood are purchased already fabricated. The Quebec plant paints them and stores them in a buffer area on the second floor. This is to let the paint dry and because it is more efficient to use a batch process for painting (i.e., a large number of the same colour cabs and hoods are painted one after another). Sixty hoods and 30 cabs can be stored in the buffer area. Typically, a cab and hood are painted two to five days before they are used. Four out of every five trucks are white. However, the different interior, engine, chassis length, and brand result in approximately 40 different products. In addition, several options are available. Paccar constantly introduces new models offering better technologies such as no-idle solution (to provide heating or cooling to the sleeper cabin while the truck engine is turned off ) and hybrid engines (built by Eaton Corporation of Cleveland). The equipment is specialized but flexible. Most material handling is by overhead conveyors. Workers appreciate this in the frame shop where they assemble beams that are heavy (1–2.5 tonnes) and long (6–13 metres). The overhead conveyors also save floor space. vitpho/123RF The parts and components are received just in time and delivered straight to the point of use. There are 31 receiving docks near the points of use. The two subassembly lines (chassis and cab) join in the middle of the left side of the plant and the truck is hauled to the final assembly and test area on the right. Capacity of the plant is 40 trucks per eighthour shift, which means that, at capacity, every 12 minutes a truck moves up one workstation. The Quebec plant periodically changes its employment level to match its production with North American demand for its trucks. In recent years, 60 to 70 trucks have been assembled per day during two shifts. Continuous When a very high volume of highly standardized output is desired, and the product is in continuous motion during production, continuous process is used. There is almost no variety in output and, hence, no need for equipment flexibility. As in repetitive process, workers are generally low skilled (except for maintenance technicians). Product is also usually continuous (i.e., it cannot be counted). Examples of products made using continuous process include gasoline, steel, paper, sugar, flour, and salt. Continuous services include utilities and the Internet. A continuous process: An oil refinery performs a continuous process, mixing and separating crude oil into gasoline, fuel oil, jet fuel, and some other products. Kevin Burke/Getty Images The managerial challenges in a continuous process are the same as in a repetitive process, but because of faster speed of production, greater care is required for automated control of the flow, and start and stop of production are more challenging. Page 211 Project A project is a nonrepetitive set of activities with a unique set of objectives to be accomplished in a limited time frame and with limited budget. Examples include such things as redesigning the arrangement of equipment/machinery (layout), consulting, launching a new product or service, publishing a book, renovating or constructing a house, and building a bridge. Equipment flexibility and worker skills can range from low to high. Projects are discussed in detail in Chapter 17. Comparison of Process Types The first four process types (job shop, batch, repetitive, and continuous) are typically ongoing operations. In situations that are not ongoing but instead are of limited duration, the work is often organized as a project. Table 6-1 provides an overview of major characteristics of the first four types of production process. Note that by the nature of the market, higher variety implies smaller demand for each variation, and lower variety implies larger demand for each variation. Page 212 TABLE 6-1 Major characteristics of the first four types of process. Product variety Job Shop Batch Repetitive/Assembly Continuous Customized Semi-standardized Standardized Highly standardized Quantity/volume Low Low–moderate High Very high Equipment flexibility Very high Moderate Low Very low Risk of process Low Low High High Low Low High Very high shutdown because of mechanical failure Speed of transportation Equipment General Specialized Scale of equipment Many small One large units unit Function Product need Loose Tight Flexibility High Low Operation of Intermittent Continuous equipment (stop & go) Worker skill level High Low Flow pattern Jumbled Linear Fixed cost Low High Variable cost High Low Challenge Scheduling Capacity, Equipment arranged by Linking of process steps technology Inventory Level of Mostly work- Mostly raw in-process material Low Very high standardization The type of process or processes used by an organization influences a great many activities of the organization. Table 6-2 briefly describes some of those influences. Process type also impacts supply chain requirements. Repetitive and continuous processes require steady inputs of high-volume goods and services. Delivery reliability in terms of quality and timing is essential. Job shop and batch processing may mean that suppliers have to be able to deal with varying order quantities and timing of orders. In some instances seasonality is a factor, so suppliers must be able to handle periodic large demand. The processes discussed do not always exist in their “pure” forms. It is not unusual to find hybrid processes —processes that have elements of other process types embedded in them. For instance, companies that operate primarily in a repetitive mode, or a continuous mode, will often have repair shops (i.e., job shops) to fix or make new parts for equipment that fails. Also, if volume increases for some items, an operation that began, say, in a job shop or as a batch mode may evolve into a batch or repetitive operation. This may result in having some operations in a job shop or batch mode, and others in a repetitive mode. TABLE 6-2 Process choice affects numerous activities/functions Activity/Function Job Shop Batch Repetitive Continuous Projects Cost estimation Difficult Somewhat Routine Routine Simple to routine complex Cost per unit High Moderate Low Low Very high Equipment used General General purpose Special purpose Special purpose Varied purpose Fixed costs Low Moderate High Very high Varied Variable costs High Moderate Low Very low High Labour skills High Moderate Low Low to high Low to high Marketing Promote Promote Promote Promote Promote capabilities capabilities; standardized standardized semi- goods/services goods/services capabilities standardized goods and services Scheduling Complex Moderately Routine Routine complex Complex, subject to change Work-in-process High High Low Low Varied inventory Page 213 Selecting a Process Type A product’s volume, variety, shape, and size and the materials used are important in process selection. Examples of types of materials include metal, plastic, glass, wood, food ingredients, and yarn. Examples of shape include round, square, and with cavity. The relationship between different types of processes with volume and variety of product or service is displayed in a product–process matrix. See Figure 6-2. FIGURE 6-2 Product–process matrix: Volume and variety influence process choice. Failure to match product requirements and production process characteristics can result in inefficiencies and higher costs than are necessary, perhaps creating a competitive disadvantage. For example, when there is only one product, using a batch process is usually inefficient because the process does not use enough automation. On the other hand, when there are many products produced on a continuous or repetitive process, the frequent product switches will result in long changeover (setup) times, which are nonproductive. However, recently, some companies have managed to handle high quantity and high variety on the same process (e.g., the “made for you” system of McDonald’s or Dell Computer’s mass customization). Another consideration is that products often go through a life cycle that begins with low quantity and increases as the product becomes better known. When that happens, a manager must know when to shift from one type of production process (e.g., job shop) to the next (e.g., batch). Product and Service Profiling Process selection can involve substantial investment in equipment and have a very specific influence on the layout of facilities, which also require heavy investment. Moreover, mismatches between operations capabilities and market demand and pricing or cost strategies can have a significant negative impact on the ability of the organization to compete or, in government agencies, to effectively service clients. Therefore, it is highly desirable to assess the degree of correlation between various process choices and market conditions before making process choices in order to achieve an appropriate matching. Product or service profiling can be used to avoid any inconsistencies by identifying key product or service dimensions and then selecting appropriate processes. Key dimensions often relate to the range of products or services that will be processed, expected order sizes, pricing strategies, expected frequency of schedule changes, and order-winning requirements. Sustainable Production of Goods and Services Processes Business organizations are facing increasing pressure from a variety of sources to operate sustainable production processes. According to the Lowell Center for Sustainable Production, “Sustainable Production is the creation of goods and services using processes and systems that are: non-polluting; conserving of energy and natural resources; economically efficient; safe and healthful for workers, communities, and consumers; and socially and creatively rewarding for all working people.”2 To achieve this, the Lowell Center advocates designing and operating processes in the following ways: “wastes and ecologically incompatible byproducts are reduced, eliminated or recycled onsite; Page 214 chemical substances or physical agents and conditions that present hazards to human health or the environment are eliminated; energy and materials are conserved, and the forms of energy and materials used are most appropriate for the desired ends; and work spaces are designed to minimize or eliminate chemical, ergonomic and physical hazard.”3 To achieve these goals, business organizations must focus on a number of factors that include energy use and efficiency, CO2 (carbon footprint) and toxic emissions, waste generation, lighting, heating, cooling, ventilation, noise and vibration, and worker health and safety. Lean Process Design Lean process design is guided by general principles that are discussed more fully in a later chapter. One principle of particular interest here is waste reduction, which relates to sustainability objectives. Lean design also focuses on variance reduction in workload over the entire process to achieve level production and thereby improve process flow. Successful lean design results in reduced inventory and floor space; quicker response times and shorter lead times; reduced defects, rework, and scrap; and increased productivity. Lean design is often translated into practice using cellular layouts, which are discussed later in this chapter. Lean process design has broad applications in seemingly diverse areas such as health care delivery systems, manufacturing, construction projects, and process re-engineering. 6.3 Technology LO3 Explain production and service automation, including green technologies. Technology and technological innovation often have a major influence on business processes. Technol ogical innovation refers to the discovery and development of new or improved products, services, or processes for producing or providing them. Technology refers to applications of scientific knowledge to the development and improvement of goods and services and/or the processes that produce or provide them. The term high technology refers to the most advanced and developed equipment and/or methods. Process technology and information technology can have a major impact on costs, productivity, and competitiveness (including speed of delivery). Process technology includes robotics and automation on the factory floor. Information technology (IT) is the science and use of computers and other electronic equipment to store, process, and send information. This includes software such as enterprise resource planning (ERP), the use of bar codes to identify and track goods, data transmission, the Internet, email, and more. With radio frequency (RFID) tags, items can be tracked during production and in inventory. For outbound goods, readers at a packing station can verify that the proper items and quantities were picked before shipping the goods to a customer or a distribution centre. In a hospital setting, RFID tags can be used in several ways. One is to facilitate keeping accurate track of hospital garments, automating the process by which clean garments are inventoried and disbursed. An RFID tag can be worn by each hospital employee. The tag contains a unique ID number that is associated with each wearer. When an employee comes to the counter to pick up garments, the employee’s tag is scanned and software generates data regarding garment, type, size, location on racks, and availability for that employee. The garments are then picked from the specified racks, their RFID tag is read by a nearby scanner and processed, and the database is automatically updated. Technological innovation in processing technology can produce tremendous benefits for organizations by increasing quality, lowering costs, increasing productivity, and expanding processing capabilities. Among the examples are laser technology used in surgery and laser measuring devices, advances in medical diagnostic equipment, high-speed Internet connections, high-definition television, online banking, information retrieval systems, and high-speed search engines. Processing technologies often come through acquisition rather than through internal efforts of an organization. While process technology can have enormous benefits, it also carries substantial risk unless a significant effort is made to fully understand both the downside and the upside of a particular Page 215 technology. It is essential to understand what the technology will and won’t do. Also, there are economic considerations (initial cost, space, cash flow, maintenance, consultants), integration considerations (cost, time, resources), and human considerations (training, safety, job loss). Automation An increasingly asked question in process design is whether to automate. Automation is machinery that have sensing and control devices that enable them to operate automatically. If a company decides to automate, the next question is how much. Automation can range from factories that are completely automated to a single automated operation. Automated services are becoming increasingly important. Examples include automated teller machines (ATMs), automated heating and air conditioning systems that include automated inspection, automated storage and retrieval systems, package sorting, mail processing, email, online banking, and E-Z pass. Automation offers a number of advantages over human labour. It has low variability, whereas it is difficult for a human to perform a task in exactly the same way, in the same amount of time, and on a repetitive basis. In a production setting, variability is detrimental to quality and to meeting schedules. Moreover, machines do not get bored or distracted, nor do they go on strike, ask for higher wages, or file labour grievances. Still another advantage of automation is the reduction of variable costs. In order for automated processing to be an option, job-processing requirements must be standardized (i.e., have very little or no variety). Both manufacturing and service organizations are increasing their use of automation as a way to reduce costs, increase productivity, and improve quality and consistency. Automation is frequently touted as a strategy necessary for competitiveness. An example of using automation for competitiveness is the gigantic automated paper-making machines that automatically sense the thickness of paper and adjust to run at speeds of more than 60 kilometres per hour. Another example is in steel making, where a “mini” mill, controlled by an integrated computer system, produces an uninterrupted hot band of steel using scrap metal and electrical charge. Mini-mills have a substantial productivity advantage over foundries, which use iron ore in blast furnaces. An example of a mini-mill is the Direct Strip Production Complex of Algoma Steel in Sault Ste. Marie, Ontario. See the “ Automated Steel Making at Algoma Steel” OM in Action. OM in ACTION Automated Steel Making at Algoma SteelB Justin Tang/Canadian Press Images Algoma Steel is an integrated steel producer in Sault Ste. Marie, Ontario. Its products meet the international standards for manufacturing, automotive, construction, mining, energy, ship, rail, and military applications. The company sells hot and cold rolled steel products, sheet, and plate with a production capacity of 4 million tonnes. The company is the producer of the cleanest light gauge steel in North America. Danieli Automation and Danieli Taranis are the suppliers chosen by the Algoma Steel Mill plant in Sault Ste. Maire for automation of its plate mill. This project will allow Algoma to produce wider plates having different shapes with better surface quality and logistics. This automation is done from level 0 to 2, which enables Algoma to produce new plates for the shipbuilding, energy, and bridge-making sectors. Along with automation, Danieli Taranis will provide engineering and post-commissioning support. The extent of automation is a complete overhaul from the reheat process to the finished products. However, automation also has certain disadvantages and limitations compared to human Page 216 labour. To begin with, it can have high initial cost. In addition, automation is much less flexible than human labour. Once a process has been automated, it is hard to change it. Management must carefully examine whether to automate and to what degree to automate, so that everyone clearly understands all the ramifications. Also, much thought and careful planning are necessary to successfully integrate automation into a production process. Otherwise, it can lead to major problems. Moreover, automation has important implications not only for cost and flexibility, but also for the fit with overall strategic priorities. If the decision is made to automate, care must be taken to remove waste from the system prior to automating, to avoid building the waste into the automated system. Figure 6-3 has a list of questions for organizations that are considering automation. FIGURE 6-3 Automation questions 1. What level of automation is appropriate? (Some operations are more suited to being automated than others, so partial automation can be an option.) 2. How would automation affect the flexibility of a process? 3. How can automation projects be justified? 4. How should changes be managed? 5. What are the risks of automating? 6. What are some of the likely effects of implementing automation on market share, costs, quality, customer satisfaction, labour relations, and ongoing operations? Generally speaking, there are three kinds of automation: fixed, programmable, and flexible. Fixed automation is the most rigid of the three types. The concept was perfected by the Ford Motor Company in the early 1900s, and it has been the cornerstone of mass production in the auto industry. It uses high-cost, specialized equipment for a fixed sequence of operations. Low unit cost and high volume are its primary advantages; minimal variety and the high cost of making major changes in either product or process are its primary limitations. Programmable automation involves the use of high-cost, flexible equipment controlled by a computer program that provides both the sequence of operations and specific details about each operation. Changing the process is as easy (or difficult) as changing the computer program. This type of automation has the capability of economically producing a fairly wide variety of low-quantity products in small batches. Numerically controlled (N/C) machines and some robots are examples of programmable automation. CNC laser cutting metal pipe with bright sparkle in factory. Industry machine. Prasit Rodphan/Alamy Stock Photo Numerically controlled (N/C) machines are programmed to follow a sequence of processing instructions based on mathematical relationships that tell the machine the details of the operations to be performed. The instructions are stored on a device such as a computer disk, magnetic tape, or microprocessor. Individual machines may have their own computer; this is referred to as computer numerical control (CNC). Or one computer may control a number of N/C machines, which is referred to as direct numerical control (DNC). The computer can directly use the dimensions of the item from the CAD software to accelerate machine programming. This is part of computer aided manufacturing (CAM), which is using software to control machines. N/C machines are best used in cases where part geometry is complex, close tolerances are required, mistakes are costly, and there is the possibility of frequent changes in the design. The main limitations of N/C machines are the higher skill levels needed to program the machines and their high initial cost. An industrial robot consists of three parts: a mechanical arm, a power supply, and a controller. Unlike movie versions of robots, which vaguely resemble human beings, industrial robots are much less glamorous and much less mobile; most robots are stationary except for their movable arms. Robots can handle a wide variety of tasks including welding, assembly (mainly surface mounting for circuit boards), loading to and unloading from machines, painting, and testing. They relieve humans of heavy, dirty, and unsafe work and often eliminate drudgery. Page 217 Some uses of robots are fairly simple; others are much more complex. At the lowest level are robots that follow a fixed set of instructions. Next are programmable robots, which can repeat a set of movements after being led through the sequence. These robots “play back” a mechanical sequence much as a camcorder plays back a visual sequence. At the next level up are robots that follow instructions from a computer. At the top are robots that can recognize objects and make simple decisions. Robots can be powered pneumatically (by air), hydraulically (by fluids), or electrically. Robotic arm at industrial manufacture factory THINK A/Shutterstock Robcad (Robot CAD) is a software that simulates the operations of a robot.4 Atomic Energy of Canada Limited uses Robcad and Siemens’ Solid Edge (CAD) to digitally model a robot in a reactor to simulate safe and fast maintenance of the reactor. Computer-integrated manufacturing (CIM) uses an integrated computer system to control the entire production process and is linked to engineering, design, and production planning and control. More encompassing CIM systems can link order taking, scheduling, purchasing, inventory control, shop control, and distribution to manufacturing. Not all elements are absolutely necessary. For instance, CIM might be as simple as linking two or more flexible manufacturing systems (FMS) by a host computer. More encompassing systems can link scheduling, purchasing, inventory control, shop control, and distribution. In effect, a CIM system integrates information from other areas of an organization with manufacturing. The overall goal of using CIM is to link various parts of an organization to achieve rapid response to customer orders or product changes, to allow rapid production, and to reduce indirect labour costs. A shining example of how process choices can lead to competitive advantages can be found at AllenBradley’s CIM process in Milwaukee, Wisconsin. The company converted a portion of its factory to a fully automated “factory within a factory” to assemble contacts and relays for electrical motors. A handful of humans operate the factory, although once an order has been entered into the system, the machines do virtually all the work, including packaging, shipping, and quality control. Any defective items are removed from the line, and replacement parts are automatically ordered and scheduled to compensate for the defective items. The humans program the machines, monitor operations, and attend to any problems signalled by a system of warning lights. 3D Printing A 3D printer is a type of industrial robot that is controlled using computer assisted design (CAD). 3D printing, also known as additive manufacturing, involves processes that create three-dimensional objects by applying successive layers of materials to create the objects. The objects can be of almost any size or shape. Although 3D printing is unlikely to replace more widespread forms of high-volume production in the foreseeable future, mainly because of its relative slowness, it does offer an alternative form of production that provides value in a wide range of applications. In some of those applications, manufacturers have been able to substantially reduce the cost and/or time needed to develop or produce items. Among the examples is production of replacement parts in the case of equipment failure when no spare parts are available. Replacement occurs much faster than the time it would take to receive the part from a supplier, thereby avoiding costly production delays. Other examples include economical production of small quantities of items, and the avoidance of shipping costs and time when the application is not near a supplier. Advances in 3D printing and reduced costs have fuelled a growth in on-demand production and micromanufacturing. On-demand production is not only attractive to customers who want customization, it also reduces inventory needs, and hence storage space and costs. Additional benefits are increased agility and a reduction in the need for end-item forecasts. 3D printing will become even more useful through development in three areas: printers and printing methods, software to design and print, and materials used in printing. Page 218 Applications of 3D Printing Commercial applications of 3D printing are occurring in a wide array of businesses, and some have consumer applications, too (see Figure 6-4). FIGURE 6-4 Some examples of applications of 3D technology Industrial Applications Mass customization: Customers can create unique designs for standard goods (e.g., cell phone cases) Distributed manufacturing: Local 3D printing centres that can produce goods on demand for pickup Computers: Computers, motherboards, other parts Robots: Robots and robot parts Rapid prototyping: Rapid fabrication of a scale model of a physical part or assembly Rapid manufacturing: Inexpensive production of one or a small number of items Medical devices: Prosthetics Dental: Crowns, implants Pharmaceutical: Pills and medicines Food products: Candy, chocolate, crackers, and pasta Apparel: Custom-designed footwear, eyeglass frames Space exploration: Tools and parts can be made on the international space station as needed instead of incurring the cost and time needed to transport them from earth Vehicles: Automotive parts, and replacement parts at repair shops; airplane parts and spare parts; also, combine multiple parts into a single part Construction: Architectural scale models Consumer Applications Hobbyists: Models, parts, and replacement parts (e.g., for drones) Appliances and tools: Replacement parts Flexible automation evolved from programmable automation. It uses equipment that is more customizable than programmable automation. A key difference between the two is that flexible automation requires significantly less changeover time. This permits almost continuous operation of equipment and product variety without the need to produce in batches. In practice, flexible automation is used in several different formats. A machining centre is a machine capable of performing a variety of machining operations such as milling, turning, and drilling on parts. The machine is numerically controlled. The suitability of these systems to a production environment primarily depends on the variety and quantity of products. Service Automation Automated services are becoming increasingly popular. Examples include ATMs, online banking, online journals and databases, electronic airplane tickets, self-service store checkout, automated toll payments, automatic meter reading, and automated package sorting and mail processing. From self check-in at the airport to depositing a cheque from anywhere, automation speeds up service and reduces the need to stand in line. For applications, see the “‘Sobeys’ New Smart Cart” and Lane Checkout Technology—My Walmart App” OM in Actions. “Fast Robots are used to serve food to customers in a seafood restaurant at East Coast Park in Singapore. Managers redesigned the layout of the restaurant and reduced the number of tables and chairs, to create a 1.2 metre wide path for the robots to navigate. Islam Yakut/Anadolu Agency via Getty Images Page 219 OM in ACTION Sobeys’ New Smart Cart Nathan Denette/Canadian Press Images Carts with artificial intelligence are a recent invention that Sobeys is experimenting with in its Oakville and Toronto, Ontario, stores. Customers gather their groceries, weigh and scan them on the cart, track their total bill, and pay for it on the cart. All these amenities have been developed to reduce checkout time and to create convenience for the shoppers. Shoppers still must bag their groceries at a checkout counter. Jacquelin Weatherbee, communications director for Sobeys, said that the carts are getting smarter over time; the carts will recognize the products, so the items won’t have to be scanned in future. OM in ACTION Fast Lane Checkout Technology—My Walmart App Globe and Mail – CP Walmart president and CEO Lee Tappenden describes the new “Urban Supercentre”—a location in Toronto combining regular and ecommerce capabilities—as “a seamless shopping experience.” The introduction of Walmart’s revolutionary “Fast Lane” checkout technology allows customers to use the My Walmart app to scan as they shop, avoiding the traditional checkout counters.Once customers finish shopping, the app provides a barcode they scan for the checkout, with payment being processed through a card on file. Tappenden says that customers’ use of Fast Lane has been twice what was expected, due to ease of use, the novelty factor, and the time savings. This new technology does not have a negative impact on the employees as they have been reassigned to other parts of the business. Drones Drones are unmanned aircraft, usually small, and remotely controlled or programmed to fly to a specific location. An important benefit of drones is providing an “eye-in-the sky” to obtain visual details in places that are hazardous to humans or that are not readily accessible. For example, drones are proving to be helpful in assessing storm and earthquake damage, especially in situations where access by vehicles or on foot is difficult or impossible because of the terrain, debris, or where roads or bridges are impassible. They are also useful for assessing crop damage, monitoring forest fires, and inspecting pipelines, cell towers, railroad tracks, and power lines. In addition, when medicines and medical supplies are urgently needed in remote areas, drones can be used to deliver them. Despite these many benefits, the use of drones poses a number of issues. There is the possibility of collisions with other drones, power lines, birds, or other objects, as well as mechanical failure or operator error, any of which can result in failure to accomplish the intended task. In addition, crashes have the potential to injure nearby humans or cause damage to property. Page 220 Green Technologies A green technology is a technology that mitigates or reverses the effects of human activity on the environment. Companies are facing increasing pressure to use green technologies that are non-polluting while conserving energy and natural resources. Chemical hazards are to be eliminated, CO2 (carbon footprint) is to be reduced, and wastes are reduced, eliminated, or recycled. An example in the grocery industry is the practice of charging customers for plastic bags to reduce their use. Another example is that companies such as Xerox and HP are recycling and reusing parts of their products. See, for example, the “Lavergne Groupe” OM in Action. OM in ACTION Lavergne Groupe Lavergne Groupe of Montreal is a relatively small plastics recycler, but its influence in plastics recycling has been enormous. Founder Jean Luc Lavergne started research on recycling PET (polyethylene terephthalate) plastic bottles in 1984. After decades of experiments, Lavergne has developed a unique plastics recycling expertise, so much so that in 2000 Hewlett-Packard partnered with Lavergne to recycle the PET plastics in its inkjet cartridges. However, it took more than a decade of experiments to get the quality of recycled PET to a level that allowed HP to reuse the recycled PET in its injection moulding machines to build new inkjet cartridges. Through its recycling program called HP Planet Partners, HP receives a good portion of its inkjet cartridges back after use from consumers. In its Nashville recycling plant, inkjet cartridges are disassembled, and the plastics are shredded and shipped to Lavergne’s Montreal plant. Each day a large container of shredded plastics (approximately 30,000 pounds) arrives. There, the HP shredded plastic is mixed with a larger amount of shredded PET made out of recycled pop bottles and some additives in a large V-shaped blender for more than three hours. Then the mixture goes through a hot extruder, which creates spaghetti-like strands at 575°F. The strands are cooled with water, chopped, treated, packed, and shipped back to Nashville. Of course, details of the recycling process are secret. HP has produced over 1 billion new ink cartridges using Lavergne’s recycled PET. Lavergne is an example of a successful company that has used its process design not only to profit but also to help the environment. 79mtk/Shutterstock macka/Shutterstock Coal-fired power plants are a major source of greenhouse gases, and many are using scrubbers to remove sulphur dioxide (SO2) emissions from their exhaust chimneys. The federal government has introduced a regulation to limit carbon dioxide (CO2) emissions from these plants. An experimental method to reduce CO2 emissions is carbon capture. The recent Boundary Dam power station carbon capture project5 in Estevan, Saskatchewan, is testing the economic viability of carbon capture. However, the utilities plan to close most of these coal-fired plants and are investing in renewable resources such as solar panels and wind turbines, and in natural-gas powered plants. 6.4 Process Design Page 221 LO4 Describe methodology for production process design, service design, and how to draw a process map. Process design determines the structure of a process—that is, the sequence of operations (the workflow), resources, and controls needed for a particular process. In this section, we will first present a methodology for production process design, then explain the differences for service design, and finally describe the design of processes that span functional areas, the subject of business process management. We assume that this is a new production process for a new product. More often, production processes are only redesigned, by either automating one part of the process or replacing a machine with a newer one. In this case, only some of the following steps need to be performed. Methodology for Production Process Design Production process design is part of the product design methodology of briefly mentioned there. Here, we will expand on it. Chapter 4, and, as such, was Given the product quantity, variety, cost, quality, delivery speed (lead time), and product specifications (nature, shape, size, components, and how they fit together): 1. Define the production process. Determine how completed the input materials should be. These are make-or-buy decisions. Set production process objectives: A. Capacity (or production speed) B. Type of process (job shop, batch, repetitive, continuous) C. Cost (fixed, variable) D. Process capability E. Technology/extent of automation F. Production start date Determine the nature of the process in general. 2. Determine production process development. 2.1 Conceptualize the design How do you get from inputs (materials) to output? What is the sequence of major operations needed? Develop a few alternative process concepts (sketches). Two approaches can be used: A. Incremental: do one step at a time from start to end. B. Hierarchical (top down): break the whole job into two operations, then divide each into suboperations until the desired level of detail is reached. Usually a process flow diagram is used to show the operations and the movement of material between the operations. Evaluate each alternative process concept. 2.2 Make an embodiment of the design Choose one process concept and complete the design. Build a prototype process (can use computer modelling) and test it. This is called a pilot plant. A. Determine the resources (machines, equipment, and labour) needed, in general. B. Estimate the costs, quality, etc., and compare with the objectives. Refine the process and re-evaluate it. 2.3 Create a detailed design Finalize the process specifications. A. Determine the machines, equipment (their capacities and make), and labour. B. Design the plant layout. C. Design the work centres. 3. Buy the machines and equipment, recruit workers, and start trial runs. Page 222 Drawing a process flow diagram starts with identifying the boundaries of the process (inputs and outputs) and the level of detail required. The incremental approach involves following the flow of material (or the customer, in services) through the transformation process and identifying the operations and resources (machines, labour, and their capabilities) required and their sequence. Experience with a similar process is useful. The five basic flowchart symbols are: The oval shape displays a beginning or end of the process The rectangle shape represents a procedure or a step in the process. The arrow shows the direction of flow of the steps in the process. The diamond shape represents a decision point in the process. The triangle shape displays a storage in the process. For technical products, expertise of process/manufacturing engineers is required. illustrates the basics of process design. Example 6-1 EXAMPLE 6-1 A company wants to diversify into mass production of bread loaves. It needs to design the production process. SOLUTION We start with the common recipe for making a loaf of bread: 1. Mix flour, salt, yeast, and water to obtain dough. 2. Knead the dough. 3. Shape the dough into a ball, put in a pan, and leave to rise. 4. Bake in oven. 5. Let bread cool and remove from pan. Because of the large quantity of flour needed (and the economy of quantity buying), a raw material storage room (or silo) will be used. Because mixing large quantities of ingredients by hand is difficult, a mixing machine is required. The same reason applies to kneading. As it happens, a machine exists that does both mixing and kneading. To automate the shaping, the easiest method is to dump the big lump of dough into a hopper that cuts and drops small pieces of dough into bread pans, which are transported on a conveyor belt for a while to let the bread rise and then passed into an open-ended oven (like an automated car wash). Next, the pans are transported on a conveyor belt for a while to cool down. Finally, bread loaves are taken out of the pans, sliced, and bagged. The following process flow diagram is a good first step: Note that storage is shown by a triangle and an operation is shown by a rectangle. Also note that flows (arrows) are usually from left to right. If there is a need to show the information flows (for control purposes), they could be shown as dashed arrows. In practice, time (or capacity) of each operation is estimated and displayed in or near its box. A similar tool is value stream mapping ( Chapter 14), which focuses on delay reduction. Service Process Design Service process design is similar to production process design except that, instead of material, the flow of the customer or something belonging to the customer should be followed. The focus is on customer experience, and the service process is usually measured by the value it creates for the customer. If the customer is not present, a service process is very similar to a manufacturing process (e.g., cheque processing). If the customer is present, a range of service delivery processes exist based on degree of customization and interaction of customer and server. The higher the customization, the more extensive the service delivery process needs to be. This requires higher server skills but costs more money. Production efficiency goes down but sales opportunity goes up. For example, getting a mortgage requires customization and involvement from a mortgage officer, and costs more to the bank than if a customer uses an ATM for cash withdrawal. However, there is more sales opportunity for the bank during mortgage application; for example, the loan officer can entice the borrower to also get a line of credit or the bank’s credit card. The self-service nature of the ATM reduces costs to the bank but service variety has to be limited. The service can easily be changed by varying the degree of customization and involvement of Page 223 customers at any step of the service. For example, a restaurant can require reservations or not; serve complimentary hot bread or not; take orders at the table or give customers an iPad to place their own order; increase or decrease the number of appetizers, entrees, desserts, and/or drinks; and allow credit card payments or not. Service Blueprint The process flow diagram for services is called a service blueprint. Service blueprinting was introduced in Chapter 4. Here, we will describe a more detailed example. Recall that a service blueprint shows how a service is to be provided. Its focus is the customer. In it, the employees can see how their role affects the service process. It can also be used to improve the service process. In the more detailed version, the activities involved in a service are separated: (1) those performed by the customer, (2) those performed by the server and visible to the customer, (3) those performed by the server and not visible to the customer, and (4) those performed by support staff (support process). Physical aspects of service such as facilities, room, food, etc., are also important and can be represented on the top row of the blueprint. These groups of activities are separated by lines of interaction, visibility, and internal interaction, respectively. Arrows/links show the flow of information and material. A double-sided vertical arrow shows a pair of shared activities. Figure 6-5 shows a blueprint for the process of conducting a bank transaction using a teller. Note that time flows from left to right. FIGURE 6-5 Blueprint for the process of conducting a bank transaction using a teller. Services are especially vulnerable to quality and delivery problems because the customer is usually present during service delivery and there is little time to fix any problems. That is why there is a need to identify potential failure points and incorporate features that minimize the chance of failure. Every link that crosses the line of interaction (called the line of information in Chapter 4) represents a “moment of truth.” The customer’s overall impression of the quality of service is formed based on moments of truth. Customer Perception in Service Process Design Another difference from manufacturing is that a service is usually varied and intangible. This raises the customer perception issue. Some suggestions to improve customer perception in services are: Do not raise customer expectations too high in the beginning. This is because customers compare their expectation and the actual service they receive in order to judge the quality of service. End the service positively, because customers better remember the end. If the service is pleasurable, divide it into segments. For example, two short rides in an amusement park may be better than one long ride. If the service is painful, combine the segments. For example, cleaning teeth in a one-hour session may be better than two half-hour sessions. Let customers control part or all of the process. For example, self-services such as ATMs are preferred by most people. In this case, it is important to make the process user-friendly. Communicate the evidence of quality to customers. Design of Processes with Interaction This section deals with design of processes where a lot of interdepartmental interactions could cause excessive delays or other inefficiencies. An example is the purchasing process in which the purchasing department, the using department (such as engineering), and accounts payable need to collaborate. Page 224 In this case, the process design/redesign involves a lot of politics because various functions which perform part of the process tend to protect their own resources. Therefore, a top manager, the sponsor, needs to be directly involved. Also, a process owner/manager has to be appointed, similar to a project manager for a project. The difference is that the process owner’s role is permanent. A process map similar to a service blueprint is used by the multi-functional process design/redesign team to display the activities/operations comprising the process. However, the grouping of activities is more precise; it is by function and even by roles within a function. This map is called a swim lane dia gram, because each function/role’s activities are in its row/lane. An example of a customer buying a cheeseburger, fries, and drink from a fast-food restaurant is displayed in flows from left to right. FIGURE 6-6 An example of a swim lane diagram Figure 6-6. Note that time Objectives for a process—such as targets for time, cost, and quality—should be determined. These should support the organization’s objectives/goals. A process should allocate the appropriate level of resources: IT and employees. The performance of the process should be regularly measured and compared with its target objectives. If performance is unsatisfactory, a minor improvement change or a major process redesign should be undertaken. See the “ Yellow Freight” OM in Action for an application of service improvement and design. OM in ACTION Yellow FreightC Yellow Freight (YRC) is the largest less-than-truckload (small freights) transportation company in North America. However, in the 1990s, it was one of the least admired. Shipments were picked up late, delivered damaged or wrong, misbilled, or lost 50 percent of the time. To improve the delivery service, top management instituted a new customer-focused vision, enabled by an effective customer-feedback process, service recovery and complaint management, and huge investments in technology support. Also, the company sought input from the employees (including 20,000 Teamsters who drive the trucks). tomas1111/123RF A delivery service blueprint was created which led to the recognition of importance of the “driver touch points.” The drivers were really the “face of Yellow” to its customers. Changes were made in their training and uniforms. Also, the importance of support by internal customer service, terminal personnel, and sales teams was recognized. Managers participated in workshops. For example, one group addressed issues related to “missed pick-ups.” A team looked for ways to avoid missed pick-ups and another looked at service recovery following a missed pick-up. Another initiative was the introduction of a new service, Exact Express, a premium service that guarantees on-time delivery of shipments within a specified time window. The process started with blueprinting an ideal service from the customer’s point of view and comparing that to the existing as well as competitors’ service blueprints. The blueprints revealed the need for customization in terms of customer access (e.g., online, fax, phone) and importance of certain “moments of truth.” Today, Exact Express is the company’s most profitable service. 6.5 Types of Layout Page 225 LO5 Discuss types of facility layout, including process, product, fixed position, and hybrid (cellular and flexible manufacturing system) layout. Layout refers to the arrangement of departments, work centres, and equipment, with particular emphasis on movement of work (customers or materials) through the system. A good layout facilitates flow of work, whereas a bad one results in congestion. This section describes the main types of layout designs and the models used to evaluate design alternatives. As in other areas of system design, layout decisions are important for three basic reasons: (1) They require substantial investments of money and effort; (2) they involve long-term commitments, which makes mistakes difficult to overcome; and (3) they have a significant impact on the cost and efficiency of operations. The need for layout planning arises both in designing new facilities and in redesigning existing facilities. The most common reasons for redesign of layouts include inefficient operations (e.g., excessive material handling/delay), changes in the design of a product, changes in the quantity or mix of products, and changes in methods or equipment. Poor layout design can adversely affect system performance. For example, if the layout is designed in such a way that operators have to walk too much, that means they don’t spend much of their time doing their actual work on the product. The basic objective of layout design is to facilitate a smooth flow of work, material, and information through the system. Supporting objectives generally involve the following: To facilitate attainment of product or service quality To use workers and space efficiently To avoid bottlenecks To minimize material handling costs To eliminate unnecessary movements of workers or materials To minimize production time or customer service time To design for safety The types of layout are: 1. Product layouts Continuous flow line Assembly line 2. Process layouts Job shop 3. Fixed-position layouts 4. Hybrid layouts Cellular layout (group technology) Flexible manufacturing system (FMS) Page 226 Product layouts are most conducive to repetitive and continuous flow line processing, process layouts are used for job shop and batch processing, and fixed-position layouts are used when projects require layouts. Hybrid layouts are combinations of these pure types; these include cellular layouts and flexible manufacturing systems. 1. Product Layouts A product layout is used to achieve a smooth and rapid flow of large volumes and low varieties of goods or customers through a system. In manufacturing environments, product layout refers to assembly line or continuous flow line, depending on the type of activity and materials involved. In a continuous flow line, products are produced continuously without break times using one process at one facility. Materials such as dry bulk or liquids are being processed in continuous flow line. Some examples are producing syrup, sugar, flour, petrochemicals, and soft drink products. Continuous flow line usually operates 24 hours per day. This is made possible by highly standardized goods or services that allow highly standardized, repetitive, and continuous processing. Assembly line is the other kind of product layout. In an assembly line, the work is divided into a series of standardized tasks, permitting specialization of both labour and equipment. The large volumes and low varieties handled by these systems usually make it economical to invest substantial sums of money in equipment and job design. Because only one item or a few very similar items are involved (low variety), it is feasible to arrange an entire layout to correspond to the production requirements of the product. For instance, if a portion of a manufacturing process requires the sequence of cutting, sanding, and painting, the appropriate pieces of equipment would be arranged in that sequence. And because each item follows the same sequence of operations, it is often possible to utilize fixed-path material-handling equipment such as conveyors to transport items between operations. A product layout can be arranged in different shapes: U shape, S shape, linear, or L shape (see Figure 6-7). FIGURE 6-7 Different product layout shapes Although a straight production line may have intuitive appeal, a U-shaped line has a number of advantages that make it worthy of consideration. One disadvantage of a long, straight line is that it interferes with cross-travel of workers and vehicles. A U-shaped line is more compact; it often requires approximately half the length of a straight production line. In addition, a U-shaped line permits increased communication among workers on the line because workers are clustered, thus facilitating teamwork. Moreover, if materials enter the plant at the same point that finished products leave it, a Ushaped line minimizes material handling. Page 227 Due to space constraint, Boeing implemented a U-shaped assembly line layout to speed up the production of 737 aircrafts and shorten the makespan of a 737 to nine days. The aircrafts are constantly on the move during the whole assembly process. Parts and components enter the process on one end of the U, and a complete aircraft comes out the other end. David R. Frazier Photolibrary, Inc./Alamy Stock Photo An assembly line can be easily shut down when the day is over and restarted again the next day. Examples of product layout are less common in services because service requirements usually exhibit too much variability to make standardization feasible. Without high standardization, many of the benefits of a repetitive process are lost. When lines are used, certain compromises must be made. Such examples of product layout in services are a cafeteria line and a car wash. assembly line and a typical layout of a cafeteria line. FIGURE 6-8 An assembly line and a cafeteria line Figure 6-8 illustrates an Product layout—TV manufacturing assembly line. TORU YAMANAKA/AFP via Getty Images Page 228 Product layout—syrup continuous processing flow line. Avatar_023/Shutterstock Product layouts achieve a high degree of labour and equipment utilization, which tends to offset their high equipment cost. Because items move quickly from operation to operation, the amount of work-inprocess is often minimal. Consequently, operations are so closely tied to each other that the entire system is highly vulnerable to being shut down because of mechanical failure or absenteeism. Preventive maintenance—periodic inspection and replacement of worn parts or those with high failure rates— reduces the probability of breakdowns during the operation. Of course, no amount of preventive maintenance can completely eliminate failures, so management must take measures to provide quick repair. These include maintaining an inventory of spare parts and having repair personnel available to quickly restore equipment to normal operation. The main advantages of product layouts are: 1. A high rate of output. 2. Low unit cost due to high volume. The high cost of specialized equipment is spread over many units. 3. Labour specialization, which reduces training costs and time, and results in a wide span of supervision. 4. Low material-handling cost per unit. Material handling is simplified because units follow the same sequence of operations. Material handling is often automated. 5. A high utilization of labour and equipment. 6. The establishment of routing and scheduling in the initial design of the system. These activities do not require much attention once the system is operating. 7. Fairly routine accounting, purchasing, and inventory control. The primary disadvantages of product layouts include the following: 1. The intensive division of labour usually creates dull, repetitive jobs that provide little opportunity for advancement and may lead to morale problems and to repetitive stress injuries. 2. Poorly skilled workers may exhibit little interest in maintaining equipment or in the quality of output. 3. The system is fairly inflexible in response to changes in the volume of output or changes in product or process design. 4. The system is highly susceptible to shutdowns caused by equipment breakdowns or excessive absenteeism because workstations are highly interdependent. 5. Preventive maintenance, the capacity for quick repairs, and spare-parts inventories are necessary expenses. 6. Incentive plans tied to individual output are impractical since they would cause variations among outputs of individual workers, which would adversely affect the smooth flow of work through the system. Page 229 2. Process Layouts A process layout (functional layout or job shop) is designed to process customized, low-volume products or provide services that involve a variety of processing requirements. Process layouts are used for intermittent processing, The variety of jobs that are processed requires frequent adjustments to equipment. This causes a discontinuous workflow, which is referred to as intermittent processing. A manufacturing example of a process layout is a machine shop, which has separate departments for milling, grinding, drilling, and so on, and similar independent pieces of equipment are arranged as a group together. Items that require these operations are moved in lots or batches to the departments in a sequence that varies from job to job. Consequently, variable-path material-handling equipment is needed (forklift trucks, skids on wheels, tote boxes, etc.). The use of general-purpose equipment provides the flexibility necessary to handle a wide range of production requirements. Workers who operate the equipment are usually skilled. Figure 6-9 compares process and product layouts. FIGURE 6-9 Comparison of process and product layouts Process layouts are quite common in services. Examples include various departments of a hospital, a grocery store, and an auto repair shop. For instance, a hospital has emergency rooms, X-ray rooms, surgery rooms, and so on. Because equipment in a process layout is arranged by type rather than by processing sequence, the system is much less vulnerable to shutdown caused by mechanical failure or absenteeism. In manufacturing systems especially, idle equipment is usually available to replace machines that are temporarily out of service. Moreover, because items are often processed in lots (batches), there is considerably less interdependence between successive operations than with a product layout. Maintenance costs tend to be lower because the equipment is less specialized than that of product layouts, and the grouping of machinery permits repair personnel to become skilled in handling that type of equipment. Machine similarity reduces the necessary investment in spare parts. On the negative side, routing and scheduling must be done on a continual basis to accommodate the variety of processing demands typically imposed on these systems. Material handling is inefficient, and unit-handling costs are generally much higher than in product layouts. In-process inventories can be substantial due to batch processing and capacity mismatches. Furthermore, it is not uncommon for such systems to have equipment utilization rates under 50 percent because of routing and scheduling complexities related to the variety of processing demands being handled. Sometimes this layout needs wide aisles to accommodate heavy loads. In sum, process layouts have both advantages and disadvantages. The advantages of process layouts include the following: 1. The systems can handle a variety of processing requirements. 2. The systems are not particularly vulnerable to equipment failures. 3. General-purpose equipment is often less costly than the specialized equipment used in product layouts and is easier and less costly to maintain. 4. It is possible to use individual incentive systems. 5. Flexibility allows for a wide variety of products or services. 6. A worker may operate a number of machines. Page 230 A machine shop. Erik Isakson/Blend Images LLC The disadvantages of process layouts include the following: 1. If batch processing is used in manufacturing systems, in-process inventory can be high. 2. Routing and scheduling are a big challenge. 3. Equipment utilization rates are low. 4. Due to the high variety of orders, variable-path material handling, and the use of manual equipment for transportation, the speed of transportation is low. Material handling is slow and inefficient, and more costly per unit than in product layouts. 5. Job complexities often reduce the span of supervision and result in higher supervisory costs than with product layouts. 6. Special attention is necessary for each product or order (e.g., routing, scheduling, machine setups) and low volumes result in higher unit costs than with product layouts. 7. Each product may require a different setup (changeover) process. 3. Fixed-Position Layouts In a fixed-position layout, the item being worked on remains stationary, and workers, materials, and equipment are moved about as needed. Almost always, the nature of the product dictates this kind of arrangement: Weight, size, bulk, or some other factor makes it undesirable or extremely difficult to move the product. Fixed-position layouts are used in large construction projects (buildings, power plants, dams), shipbuilding, and production of large aircraft and space mission rockets. In those instances, attention is focused on timing of material and equipment deliveries so as not to clog up the work site and to avoid having to relocate materials and equipment around the work site. Lack of storage space can present significant problems, for example, at construction sites in crowded urban locations. Because of the many diverse activities carried out on large projects and because of the wide range of skills required, special efforts are needed to coordinate the activities, and the span of control can be quite narrow. For these reasons, the administrative burden is often much higher than it would be under either of the other layout types. When goods and materials are involved, material handling often resembles process-type, variable-path, general-purpose equipment. Projects might require use of earthmoving equipment and trucks to haul materials to, from, and around the work site, for example. Fixedposition layouts are widely used in farming, firefighting, road building, home building, remodelling and repair, and drilling for oil. In each case, compelling reasons bring workers, materials, and equipment to the product’s location instead of the other way around. Page 231 Example of fixed-position layout: An operation. Franck Boston/123RF The Queen Mary 2 when under construction at the Chantiers de l’Atlantique shipyard in St. Nazaire, France. When a large project must remain stationary, workers and equipment come to the site. Alain Denantes/Gamma-Rapho/Getty Images Page 232 4. Hybrid Layouts The three basic layout types (product, process, and fixed-position) are ideal models, which may be altered to satisfy the needs of a particular situation. It is not hard to find layouts that represent some combination of these pure types. For instance, supermarket layouts are essentially process layouts, yet we find that most use fixed-path material-handling devices such as roller-type conveyors in the stockroom and belt-type conveyors at the cash registers. Hospitals also use the basic process arrangement, although frequently patient care involves more of a fixed-position approach, in which nurses, doctors, medicines, and special equipment are brought to the patient. By the same token, faulty parts made in a product layout may require offline reworking, which involves customized processing. Moreover, conveyors are frequently observed in both farming and construction activities. Process layouts and product layouts represent two ends of a continuum from small jobs to continuous production. Process layouts are conducive to the production of a wider range of products or services than product layouts, which is desirable from a customer standpoint where customized products are often in demand. However, process layouts tend to be less efficient and have higher unit production costs than product layouts. Some manufacturers are moving away from process layouts in an effort to capture some of the benefits of product layouts. Ideally, a system is flexible and yet efficient, with low unit production costs. Cellular layouts (group technology) and flexible manufacturing systems represent efforts to move toward this ideal. Cellular Layouts In a cellular layout, different machines are arranged in a cell that can process items with similar processing requirements, called a part family. A cell is a small version of a product layout; it may have no conveyorized movement of parts between machines, or may have a conveyor (automatic transfer). Figure 6-10 compares a typical functional (process) layout and a cellular layout. Observe that in the cellular layout, machines are arranged to handle all of the operations necessary for a group (family) of similar parts. Thus, all parts in the same family follow the same route, although minor variations (e.g., skipping an operation) are possible. In contrast, the functional (process) layout involves multiple paths for these parts. Table 6-3 compares the characteristics of cellular and functional layouts. FIGURE 6-10 Comparison of functional (process) and cellular layouts Adapted from D. Fogarty and T. Hoffmann, Production and Inventory Management (Cincinnati-South-Western Publishing, 1983), p. 472. Page 233 TABLE 6-3 Comparison of characteristics of functional (process) and cellular layouts Dimension Functional Cellular Number of moves between departments Many Few Travel distances Longer Shorter Travel paths Variable Fixed Job waiting time Greater Shorter Throughput time Higher Lower Amount of work in process Higher Lower Dimension Functional Cellular Supervision difficulty Higher Lower Scheduling complexity Higher Lower Equipment utilization Lower Higher The implementation of cell manufacturing often requires employee training and the redefinition of jobs. Each of the workers in each cell should ideally be able to complete the entire range of tasks required in that cell, and often this means being more multiskilled than they were previously. In addition, cells are often expected to be self-managing, and therefore workers will have to be able to work effectively in teams. Managers have to learn to be less involved than with more traditional work methods. A cell is usually U-shaped (see Figure 6-11). A U-shaped line permits increased communication among workers on the line, thus facilitating teamwork. Also, flexibility in work assignments is increased because workers can handle not only adjacent stations but also stations on opposite sides of the line. FIGURE 6-11 A U-shaped cell The biggest challenges of implementing cellular manufacturing involve issues of equipment and layout and issues of workers and management. Equipment and layout issues relate to design and cost. The costs of work stoppages during implementation can be considerable, as can the costs of new or modified equipment and the rearrangement of the layout. The costs to implement cellular manufacturing must be weighed against the cost savings that can be expected from using cells. Also, the implementation of cell manufacturing often requires employee training and the redefinition of jobs. Each of the workers in each cell should ideally be able to complete the entire range of tasks required in that cell, and often this means being more multiskilled than they were previously. In addition, cells are often expected to be self-managing, and therefore workers will have to be able to work effectively in teams. Managers have to learn to be less involved than with more traditional work methods. Group technology: Effective cellular manufacturing must have groups of identified items with similar processing characteristics. Group technology involves identifying items with similarities in either design or manufacturing characteristics, and grouping them into families. Design characteristics include size, shape, material, features (holes, slots, notches, grooves), and function; manufacturing characteristics involve the type/sequence of operations and tolerance (precision) required. group of parts with similar characteristics. Figure 6-12 illustrates a Page 234 FIGURE 6-12 A group of parts with similar characteristics Once similar items have been identified, items can be classified according to their families and coded, and a system can be developed that facilitates retrieval of these codes from the database for purposes of design and manufacturing. For instance, a designer can use the system to determine if there is an existing part similar or identical to the one that needs to be designed. It may happen that an existing part, with some modification, is satisfactory. This greatly enhances the productivity of design. Similarly, planning the manufacturing of a new part can include matching it with one of the part families in existence, thereby alleviating much of the burden of specific processing details. The conversion to group technology is often a major undertaking; it is a time-consuming job that involves the analysis of a considerable amount of data. Three primary methods for accomplishing this are visual inspection, examination of design and production data, and production flow sequence and routing analysis. Visual inspection is the least accurate of the three but also the least costly and the simplest to perform. Examination of design and production data is more accurate but much more time consuming. It is perhaps the most commonly used method of analysis. Production flow analysis has a manufacturing perspective and not a design perspective, because it examines operation sequences and machine routings to uncover similarities. Moreover, the operation sequences and routings are taken as givens. In reality, the existing procedures may be far from optimal. Some variations/combinations of line and cellular layouts are possible. The decision between line layout and cellular layout depends on room (line requires larger space), lot size (larger lots favour line), nature of workforce (temporary workers do better with the simpler, shorter tasks of a line), required flexibility (cells are better for dissimilar products of various lot sizes), and budget (line requires roller or belt conveyors). Flexible Manufacturing System (FMS) A flexible manufacturing system (FMS) is a group of machining centres, controlled by a computer, with automatic material handling, robots, or other automated equipment (see Figure 6-13). They can produce a variety of similar products. An FMS may have two to a dozen machines. They are designed to handle intermittent processing requirements with some of the benefits of automation and some of the flexibility of individual, or stand-alone, machines (e.g., N/C machines). An FMS offers reduced labour costs and more consistent quality compared with more traditional manufacturing methods, lower capital investment and higher flexibility than fixed automation, and relatively quick changeover time. An FMS appeals to managers who hope to achieve both the flexibility of job shop and the productivity of repetitive process. FIGURE 6-13 A flexible manufacturing system line An FMS also has some limitations. One is that this type of system can handle a relatively narrow range of part variety, so it must be used for a family of similar parts requiring similar machining. Also, an FMS requires longer planning and development times than more conventional processing equipment because of its increased complexity and cost. Furthermore, companies sometimes prefer a gradual approach to automation, but an FMS represents a sizable chunk of technology. Page 235 Methodology for Layout Design The objectives of manufacturing layouts are cost minimization and product flow. The following steps are used in manufacturing layout design. Other layout designs follow similar steps. Determine the location of receiving and shipping. For “product layout,” fit the process flow diagram onto a sketch of the factory floor, starting from receiving and ending in shipping. Determine the approximate location of each part of the process. For “process layout,” determine the expected workflow between pairs of departments, and place the two departments with the highest workflows closest to each other. Continue until all departments are located. Keep special requirements of machines in mind (e.g., a heavy press needs a strong foundation, the paint department needs a clean environment). Allow space for machines, in-feeds, out-feeds, workers, and carts/forklifts. Keep rearranging the plan using feedback from workers until you find what works best. On the factory floor, paint an outline of machines and in-feed and out-feed spaces. Walk through the normal sequence of activities. Install the electricity and other lines, and move the machines in. Service Layouts As is the case with manufacturing, service layouts can often be categorized as product, process, or fixed-position layouts. In a fixed-position service layout (e.g., appliance repair, roofing, landscaping, home remodelling, copier service), materials, labour, and equipment are brought to the customer’s residence or office. Process layouts are common in services due mainly to the high degree of variety in customer processing requirements. Examples include hospitals, supermarkets, department stores, vehicle repair centres, and banks. If the service is organized sequentially, with all customers or work following the same or a similar sequence, as it is in a car wash or a cafeteria line, a product layout is used. However, service layout requirements are somewhat different from manufacturing layout requirements. The degree of customer contact and the degree of customization are two key factors in service layout design. If contact and customization are both high, as in health care and personal care, the service environment is a job shop, usually with high labour content and flexible equipment, and a layout that supports this. If customization is high but contact is low (e.g., picture framing, tailoring), the layout can be arranged to facilitate workers and equipment. If contact is high but customization is low (e.g., supermarkets, gas stations), self-service is a possibility, in which case layout must take into account ease of obtaining the service as well as customer safety. If the degree of contact and the need for customization are low, the core service and the customer can be separated, making it easier to achieve a high degree of efficiency in operations. Highly standardized services may lend themselves to automation (e.g., web services, online banking, automated teller machines). Let’s consider some of these layouts. Page 236 Warehouse Layout The design of storage facilities presents a different set of factors than the design of factory layouts. Frequency of order is an important consideration. Items that are ordered frequently should be placed near the entrance to the facility, and those ordered infrequently should be placed toward the rear of the facility. Any correlations between items are also significant (i.e., item A is usually ordered with item B), suggesting that placing those two items close together would reduce the cost and time of picking (retrieving) those items. Other considerations include the number and widths of aisles, the height of storage racks, rail and/or truck loading and unloading, and the need to periodically make a physical count of stored items. Warehouse layout is discussed in detail in Chapter 15. Retail Layout The objectives that guide design of manufacturing layouts often pertain to cost minimization and product flow. However, with retail layouts such as department stores, supermarkets, and specialty stores, designers must take into account the presence of customers and the opportunity to influence sales volume and customer attitudes through carefully designed layouts. Traffic patterns and traffic flow are important factors to consider. Some large retail chains use standard layouts for all or most of their stores. This has several advantages. Most obvious is the ability to save time and money by using one layout instead of custom designing one for each store. Another advantage is to avoid confusing consumers who visit more than one store. In the case of service retail outlets, especially small ones such as dry cleaners, shoe repair, and auto service centres, layout design is much simpler. Some large retail chains use standard layouts for all of their stores. For an example, see the “ Walmart’s Layout Persuades Its Shoppers to Buy” OM in Action. OM in ACTION How Walmart’s Layout Persuades Its Shoppers to BuyD How Walmart designs it’s layout to give the best possible shopping experience to its customers. Once a customer enters the store, signs, colours, and displays play an important role in encouraging shoppers to buy something. They are often used to persuade shoppers subconsciously by using tactics such as the following: Impulse areas. These areas grab customers’ attention for last-minute items. For example, candy and treats are near the cash register so shoppers can buy them as a reward for their well-done shopping job or for their demanding children! Endcaps. The end of a long row of shelving is reserved for special offers, roll back, and clearance items. Store-in-a-store. Differently decorated floor space makes different areas of the store stand out. Eye (and buy) level: Promoted items are placed within reach of the customers somewhere between eye level and waist level. Traffic builders: Everyday items are placed at the back of the store. Action alley: Low-priced products are displayed in the middle of the main shopping aisles. Stores in front of store: Different stores are laid out in the front section (i.e., restaurants and vision centres). Signpost brands: Nationally advertised brands are placed near lower-cost store brands. Overall environment: The overall look of the store is designed to identify where promotion items are (i.e., rollback and clearance items). Colours and smells: Different colours and smells are used to create an impression. For example, shoppers are invited in by displaying the fresh and colourful vegetables and bakery at the front. Product range: A high variety of items are displayed for each product. Making it hard to find things: For some items, customers cannot easily find what they came to buy. So they look around and occasionally buy some other items they had no intention of buying. Counterclockwise movement: Shoppers are encouraged to move in a counterclock wise direction. Research shows that customers who move counterclockwise spend more per trip to the supermarket. Each one of these tactics plays a different role in influencing consumers. Some are more aggressive and obvious, and others are more subtle. They are targeted to individuals at all stages of their shopping experience, and they work to attract them to the store and, once they are in, they encourage purchases. Page 237 Office Layout Office layouts underwent a transformation as the flow of paperwork was replaced with electronic communication. That means there is less need to place office workers in a layout that optimizes the physical transfer of information or paperwork. A new trend is to create an image of openness; office walls are giving way to low-rise partitions. Restaurant Layout There are many different types of restaurants, ranging from fast food to full service. Many belong to chains, and some of those are franchises. That type of restaurant typically adheres to a floor plan established by the company. Independent restaurants and bars have their own floor plans. Some have what could be considered very good designs, while others do not. The most important element is process workflow. Food and non-food products should transition easily through the process from storage, preparation, and cooking to the customer. Hospital Layout Hospitals are the most complex of building types.6 Each hospital comprises a wide range of services and functional units. These include diagnostic and treatment functions such as clinical labs, imaging, emergency rooms, and surgery; hospitality functions such as food service and housekeeping; and the fundamental inpatient care or bed-related function. The functional units within the hospital can have competing needs and priorities. Physical relationships between these functions determine the configuration of the hospital. Surgery is an example of fixed-position layout in the hospital. In a large hospital, the form of the typical nursing unit is a principal element of the overall configuration because it is repeated many times. Compact rectangles, modified triangles, and even circles have been used in an attempt to shorten the distance between the nursing station and the patient’s bed. A hospital layout should minimize walking distance of staff and patients, be designed on a Page 238 modular basis, be easy to expand, provide a therapeutic and aesthetic environment, be easy to clean and maintain, provide accessibility to all areas, control circulation of people and goods, be secure and safe, and be sustainable. Key elements of hospital layout design are patient care and safety as well as easy access to critical resources such as X-ray, CAT scan, and MRI equipment. The general layout of the hospital is one aspect of layout, while layout of patient rooms is another. See Mini-Case at the end of the chapter. “A Safe Hospital Room of the Future” 6.6 Assembly-Line Balancing LO6 Explain how to balance an assembly line. The goal of a product layout is to arrange workers or machines in the sequence that operations need to be performed. The sequence is referred to as a production line or an assembly line. These lines range from fairly short, with just a few operations, to long lines that have a large number of operations. Automobile assembly lines are examples of long lines. Because it is difficult and costly to change a product layout that is inefficient, design is a critical issue. Many of the benefits of a product layout (assembly line) relate to the ability to divide the required work into a series of tasks (e.g., “assemble parts C and D”) that can be performed quickly and routinely by low-skilled workers or specialized equipment. The durations of these tasks typically range from a few seconds to a few minutes. Most time requirements are so brief that it would be impractical to assign only one task to each worker. Instead, tasks are usually grouped into manageable bundles and assigned to workstations staffed by one or two operators. The process of deciding how to assign tasks to workstations in such a way that the workstations have approximately equal time requirements is called line balancing. This minimizes the idle time along the line and results in high utilization of labour and equipment. Idle time occurs if time requirements are not equal among workstations. Workstations with less work are capable of producing at higher rates than others. These “fast” workstations will experience periodic waits for the output from slower workstations or to avoid build-ups of work in downstream workstations. Unbalanced lines are undesirable in terms of inefficient utilization of labour and equipment and because they may create morale problems at the slower workstations for workers who must work continuously. The major obstacle to attaining a perfectly balanced line is that forming task bundles with the same duration is difficult, for several reasons. (1) It may not be feasible to combine certain activities into the same bundle, either because of differences in skill or equipment requirements or because the activities are not compatible (e.g., risk of contamination of paint from grinding). (2) Differences among task lengths cannot always be overcome by grouping the tasks. (3) The technological sequence may prohibit otherwise desirable task combinations. Lines that are perfectly balanced will have a smooth flow of work as activities along the line are synchronized to achieve maximum use of labour and equipment. The major obstacle to attaining a perfectly balanced line is the difficulty of forming task bundles that have the same duration. One cause of this is that it may not be feasible to combine certain activities into the same bundle, either because of differences in equipment requirements or because the activities are not compatible (e.g., risk of contamination of paint from sanding). Another cause of difficulty is that differences among elemental task lengths cannot always be overcome by grouping tasks. A third cause of an inability to perfectly balance a line is that a required technological sequence may prohibit otherwise desirable task combinations. Consider a series of three operations that have durations of two minutes, four minutes, and two minutes, as shown in the following diagram. Ideally, the first and third operations could be combined at one workstation and have a total time equal to that of the second operation. However, it may not be possible to combine the first and third operations. In the case of an automatic car wash, scrubbing and drying operations could not realistically be combined at the same workstation due to the need to rinse cars between the two operations. Page 239 Usually, each workstation has one worker who handles all of the tasks at that workstation, although an option is to have two workers at a single workstation. For purposes of illustration, however, all of the examples and problems in this chapter have workstations with one worker. A manager could decide to use anywhere from one to five workstations to handle five tasks. With one workstation, all tasks would be done at that workstation; with five workstations, one task would be assigned to each workstation. If two, three, or four workstations are used, some or all of the workstations will have multiple tasks assigned to them. How does a manager decide how many workstations to use? The primary determinant is the line’s cycle time (also called takt time), the maximum time allowed at each workstation to perform its assigned tasks before the unit moves on. The cycle time also establishes the output rate of a line. For instance, if the cycle time is two minutes, units will come off the end of the line at the rate of one every two minutes. Hence, the line’s capacity is a function of its cycle time. We can gain some insight into task groupings and cycle time by considering a simple example. Suppose that the work required to fabricate a certain product can be divided up into five elemental tasks, with the task times and precedence relationships as shown in the following diagram: The task times govern the range of possible cycle times. The minimum cycle time is equal to the longest task time (1.0 minute), and the maximum cycle time is equal to the sum of the task times (0.1 + 0.7 + 1.0 + 0.5 + 0.2 = 2.5 minutes). The minimum cycle time would apply if there were five workstations. The maximum cycle time would apply if all tasks were performed at a single workstation. The minimum and maximum cycle times are important because they establish the potential range of output for the line. As a general rule, the cycle time is determined by: OT (6-1) CT = D where CT = Cycle time OT = Operating time per day D = Desired output per day (i.e., demand) For example, suppose that the desired output rate is 480 units per day, and the line will operate for eight hours per day (480 minutes). Using Formula 6-1, the necessary cycle time is 480 minutes per day = 1.0 minute per unit 480 units per day The number of workstations that will be needed is a function of the cycle time, the sum of task times, and our ability to combine tasks into workstations. We can determine the theoretical minimum number of workstations necessary, given a cycle time, as follows: ∑t (6-2) N min = CT where Nmin = Theoretical minimum number of workstations Ʃt = Sum of task times Given cycle time of 1 minute per unit, if sum of task times is 2.5 minutes, the minimum number of workstations required to achieve this goal is: N min = 2.5 minutes per unit = 2.5 workstations 1 minute per unit per workstation Because 2.5 workstations is not feasible, it is necessary to round up (because 2.5 is the minimum) to three workstations. Thus, the actual number of workstations used will equal or exceed three, depending on how successfully the tasks can be grouped into work bundles. Page 240 A very useful tool in line balancing is a precedence network. Figure 6-14 illustrates a simple precedence network. It visually portrays the tasks that are to be performed along with the precedence requirements; that is, the order in which tasks may be performed. The network is read from left to right, so the initial task(s) are on the left and the final task is on the right. In terms of precedence relationship, we can see from the diagram, for example, that the only requirement to begin task b is that task a must be finished. However, in order to begin task d, tasks b and c must both be finished. FIGURE 6-14 A simple precedence network Now let’s see how a line is balanced. This involves assigning tasks to workstations. Generally, no technique is available that guarantees an optimal set of assignments. Instead, managers employ heuristic (intuitive) rules, which provide good sets of assignments. A number of line balancing heuristics are in use, three of which are described here for purposes of illustration: 1. Assign the task with the longest time. 2. Assign the task with the most followers. 3. Assign the task with the largest positional weight (the sum of the task’s time plus the time of all the following tasks). You would encounter the following tasks by tracing all the paths (in the direction of arrows) from the task in question through the precedence network to the end node (final task). The general procedure used in line balancing is described in Figure 6-15. FIGURE 6-15 Line balancing procedure 1. Identify the cycle time and the minimum number of workstations. 2. Make assignments to workstations in order, beginning with workstation 1. Tasks are assigned to workstations moving from left to right through the precedence network. Start each workstation with Time left = Cycle time. 3. Before each assignment, use the following criteria to determine if a task (a) is eligible and (b) will fit: A. A task is eligible if all its preceding tasks in the precedence network have been assigned. B. A task will fit if its time does not exceed the time left at the workstation. If no eligible tasks will fit, set Idle time = Time left, and move on to the next workstation. 4. Assign tasks (and break ties) using one of these heuristic rules: A. Assign the task with the longest time. B. Assign the task with the most followers. C. Assign the task with the largest positional weight. 5. After each task assignment, update the time left at the workstation by subtracting the time of assigned task from time left. 6. Continue until all tasks have been assigned to workstations. Calculate total idle time. Page 241 EXAMPLE 6-2: Assigning Tasks According to the Longest Time Tasks Assign the tasks shown in Figure 6-14 to workstations using the minimum cycle time. a. Use the heuristic rule “Assign the task with the longest time.” b. Calculate the rate of output that could be expected for this line assuming a 480minute working day. SOLUTION a. The minimum cycle time is equal to the longest task time (1.0 minute). 1. Begin with tasks a and c, which are eligible to be assigned, but only task c has the longest time. So assign task c to workstation 1. 2. Next, only task a is eligible to be assigned and will fit in the time remaining at workstation 1, so assign task a to workstation 1. 3. There is only 0.2 time left at workstation 1, and b now has the longest time. But it will not fit at workstation 1, so we move on to workstation 2, assigning task b to workstation 2. 4. There is no time left at workstation 2, so we move on to workstation 3, assigning task d and then task e to that workstation. The idle time is 0.3. Workstation 1 2 3 Time Left Eligible Will Fit Task (time) 1.0 a, c a, c* c (0.7) 0.3 a a a (0.1) 0.2 b -- 1.0 b b 0.0 d – 1.0 d d d (0.5) 0.5 e e e (0.2) 0.3 – Idle Time 0.2 b (1.0) 0.0 – 0.3 0.5 Comment. The initial time left for each workstation is equal to the cycle time. For a task to be eligible, tasks preceding it on the precedence network must have been assigned, and for it to fit, the task’s time must not exceed the workstation’s time left. The following is a graphical representation of the determined work bundles. b. Based on the minimum cycle time which is equal to the longest task time (1.0 minute), the rate of output per day D for this line will be 480 units. OT CT = 480 minutes per day = D = 1.0 minute per unit D = 480 units output per d D Two widely used measures of effectiveness of the result of line balancing are: 1. The percentage idle time of the line, sometimes referred to as the balance delay: Sum of idle times per unit Percentage idle time = (6-3) × 100 N actual × Cycle time where Nactual = Actual number of workstations. For the preceding example: 0.5 Percentage idle time = × 100 = 16.7% 3 × 1.0 2. The efficiency of the line: (6-4) Ef f iciency = 100 − Percentage idle time In the preceding example, Ef f iciency = 100% − 16. 7% = 83. 3%. Page 242 EXAMPLE 6-3: Assigning Tasks According to the Most Followers Using the information contained in the table shown, do each of the following: 1. Draw a precedence diagram. 2. Assuming an eight-hour workday, compute the cycle time needed to obtain an output of 400 units per day. 3. Determine the minimum number of workstations required. 4. Assign tasks to workstations using this rule: “Assign tasks according to the most followers.” In case of a tie, use the tiebreaker of assigning the task with the longest processing time first. Task Immediate Predecessor Task Time (in minutes) a — 0.2 b a 0.2 Task Immediate Predecessor Task Time (in minutes) c — 0.8 d c 0.6 e b 0.3 f d, e 1.0 g f 0.4 h g 0.3 Σt = 3.8 5. Compute the resulting percent idle time and efficiency of the system. SOLUTION 1. Drawing a precedence diagram is a relatively straightforward task. Begin with activities with no predecessors. We see from the list that tasks a and c do not have predecessors. We build from here. Step 1: Step 2: Task b follows a, and d follows c. Step 3: Task e follows b. Step 4: Task f follows e, and d. Step 5: Task g follows f, and h follows g. Operating time 2. Cycle time = 480 minutes per day = = Desired output rate 3. N min = ∑t 400 units per day 3.8 minutes per unit = Cycle time = 3.1 1.2 minutes per cycle per station 4. Beginning with station 1, make assignments following this procedure: Determine from the precedence diagram which tasks are eligible for assignment. Then determine which of the eligible tasks will fit the time remaining for the station. Use the tiebreaker if necessary. Once a task has been assigned, remove it from consideration. When a station cannot take any more assignments, go on to the next station. Continue until all tasks have been assigned. Station Time Remaining 1 2 Assign (task time) Revised Time Remaining 1.2 Eligible a, c* Will Fit a, c* 1.0 c, b** c, b** c (0.8) 0.2 0.2 b, d b b (0.2) 0.0 0 e, d None — 1.2 e, d e, d d (0.6) 0.6 0.6 e e e (0.3) 0.3 Idle a (0.2) 0.0 Station 3 4 Revised Time Remaining Time Remaining 0.3*** Eligible Will Fit Assign (task time) f None — 1.2 f f f (1.0) 0.2 g None — 1.2 g g g (0.4) 0.8 0.8 h h h (0.3) 0.5 0.5 — — — Idle 0.3 0.2 0.2 0.5 1.0 min. These assignments are shown in the following diagram. Note: One should not expect that heuristic approaches will always produce optimal solutions; they merely provide a practical way to deal with complex problems that may not lend themselves to optimizing techniques. Moreover, different heuristics often yield different answers. 5. Percent idle time = 1.0min. × 100% = 20.83% 4 × 1. 2min. Ef f iciency = 100% − 20.83% = 79.17% If the last workstation has a large idle time and the desired output rate is flexible, it might be worthwhile to increase the cycle time slightly and see if the number of workstations can be reduced by 1, thus saving significant labour cost. Page 243 Some Guidelines for Line Balancing Sometimes technological constraints tell us which elemental tasks are eligible to be assigned at a particular position on the line. For example in a car wash, the rinsing operation must be performed before the drying operation. The drying operation is not eligible for assignment until the rinsing operation has been assigned. In another example, sanding and painting operations would not be assigned to the same work centre because dust particles from the sanding operation could contaminate the paint. Output constraints, on the other hand, determine the maximum amount of work that a manager can assign to each workstation, and this determines whether an eligible task will fit at a workstation. The desired output rate determines the cycle time, and the sum of the task times assigned to any workstation must not exceed the cycle time. If a task can be assigned to a workstation without exceeding the cycle time, then the task will fit. Once it is known which tasks are eligible and will fit, the manager can select the task to be assigned (if there is more than one to choose from). This is where the heuristic rules help us decide which task to assign from among those that are eligible and will fit. Technical considerations include skill requirements of different tasks. If skill requirements of tasks are quite different, it may not be feasible to place the tasks in the same workstation. Similarly, if the tasks themselves are incompatible (e.g., the use of fire and flammable liquids), it may not be feasible even to place them in stations that are near each other. Developing a workable plan for balancing a line may also require consideration of human factors as well as equipment and space limitations. Neither of the heuristics guarantees the best solution (or even a good solution) to the line balancing problem, but they do provide guidelines for developing a solution. It may be useful to apply several different heuristics to the same problem and pick the best (least idle time) solution out of those developed. Page 244 Variable Task Times Although it is convenient to treat assembly operations as if their cycle time will be the same in each repetition, it is more realistic to assume that task times will be variable. The reasons for the variations are numerous, including worker fatigue, boredom, material shortages, defects, mechanical problems, and product differences. The following example shows the effect of variation in task times on output. If three workstations each take 3 minutes to perform their tasks, then the output of the line will be 20 units per hour, with Percentage idle time = 0 (see case a in the following figure). However, if each workstation’s time ranges from 2 to 4 minutes uniformly, assuming that there is no room for inventory between the workstations, it can be shown using simulation that the output of the line drops to 17.4 units per hour, with Percentage idle time = 13 percent (see case b in the figure below). Note that the average workstation time is still 3 minutes; however, workstations 1 and 2 are blocked if their successor workstations take longer and workstations 2 and 3 are starved if their predecessor workstations take longer. Solutions to the variable task times include: Reducing the variability (e.g., by designing the work better, by using high-quality material, and by doing preventive maintenance). Using buffer inventory between workstations. Leaving some idle time in workstations that have variable time. Cross-training workers so that an adjacent worker can assist a worker who is temporarily overburdened. Treatment of Bottleneck Workstation Several solutions are used to deal with a bottleneck workstation. First, one or more tasks in the bottleneck workstation can be automated or made easier using equipment such as a tool balancer. Second, if the bottleneck occurs because of only some products, the tasks for these products can be done offline or online by a special crew of “floaters.” Third, use parallel workstations, which increase the workflow and provide flexibility. Consider the following example. A job has four tasks; task times are 1 minute, 1 minute, 2 minutes, and 1 minute. Assume each task is assigned to a different workstation and there are no buffer inventories between the workstations. The cycle time for the line will be 2 minutes per unit and the output rate will be 30 units per hour: 60 minutes per hour = 30 units per hour 2 minutes per unit Using parallel workstations for the third task would result in a cycle time of 1 minute per unit because the output rate at the parallel workstations would total 60 units per hour, and this allows an output rate for the line of 60 units per hour: Page 245 Another approach to achieving a balanced line is to cross-train workers so that they are able to perform more than one task. Then, when bottlenecks occur, the workers with temporarily increased idle time can assist other workers who are temporarily overburdened, thereby maintaining an even flow of work along the line. This is sometimes referred to as dynamic line balancing, and it is used most often in lean production systems. Still another approach is to design a line to handle more than one product on the same line. This is referred to as a mixed model line. Naturally, the products have to be fairly similar, so that the tasks involved are pretty much the same for all products. This approach offers great flexibility in varying the amount of output of the products. 6.7 Designing Process Layouts LO7 Develop simple process (functional) layouts. In a process layout, similar equipment is grouped in a department. Design of process (functional) layouts involves determining the position of the departments on the facility floor. For example, in Figure 6-16, departments 1 to 6 must be assigned to locations A to F on the facility floor. In general, some departments benefit from having adjacent locations, whereas others should be separated. For example, a lab with delicate equipment should not be located near a department with strong vibrations. Conversely, two departments that share some equipment would benefit from being close together. FIGURE 6-16 In process layouts, departments are assigned to locations on the facility floor. Layouts can also be influenced by external factors such as the location of entrances, loading docks, elevators, windows, and areas of reinforced flooring. Also important are noise levels, safety, and the size and locations of restrooms. In some instances (e.g., the layouts of supermarkets, gas stations, and fast-food chains), a sufficient number of installations having similar characteristics justify the development of standardized layouts. For example, the use of the same basic patterns in McDonald’s fast-food locations facilitates construction of new structures and employee training. Food preparation, order taking, and customer service follow the same pattern throughout the chain. Installation and service of equipment are also standardized. This same concept has been successfully employed in computer software products such as Microsoft Windows and the Macintosh Operating System. Different applications are designed with certain basic features in common, so that a user familiar with one application can readily use other applications without having to start from scratch with each new application. A major obstacle to finding the most efficient layout of departments is the large number of possible assignments. For example, there are more than 87 billion different ways that 14 departments can be assigned to 14 locations if the locations form a single line. Different location configurations (e.g., 14 departments in a 2 × 7 grid) often reduce the number of possibilities, as do special requirements (e.g., the stamping department may have to be assigned to a location with reinforced flooring). Still, the remaining number of layout possibilities is quite large. Unfortunately, no algorithms exist to identify the best layout arrangement under all circumstances. Often planners must rely on heuristic rules to guide trial-and-error efforts for a satisfactory solution to each problem. Page 246 Measures of Effectiveness One advantage of process layouts is their ability to satisfy a variety of processing requirements. Customers or materials in a process layout may require different operations and different sequences of operations, which causes them to follow different paths through the facility. Because transportation cost, distance, or time can be significant, one of the major objectives in process layout design is to minimize total transportation cost, distance, or time. This is usually accomplished by locating departments with relatively high interdepartmental workflow as close together as possible. Other concerns in choosing among alternative layouts include initial costs in setting up the layout, expected operating costs, the amount of effective capacity created, and the ease of modifying the system. In situations that call for improvement of an existing layout, costs of relocating any work centre must be weighed against the potential benefits of the move. Information Requirements The inputs to process layout design are: 1. A list of departments or work centres, their approximate dimensions, and the dimensions of the building that will house the departments. 2. Current and forecast of future workflows between the various departments. 3. The distance between centres of locations and the cost or time per unit of distance to move loads between locations. 4. A list of any special considerations (e.g., departments that must be close to each other or that must be separated). 5. The location of key utilities, access and exit points, loading docks, and so on, in existing buildings. The ideal situation is to first develop a layout and then design the physical structure around it, thus permitting maximum flexibility in design. This procedure is commonly followed when new facilities are constructed. Nonetheless, many layouts must be developed in existing structures where floor space, the dimensions of the building, location of entrances and elevators, and other similar factors must be carefully weighed in designing the layout. Note that multilevel structures pose special problems for layout planners. Minimizing Transportation Costs or Distances The most common goals in designing process layouts are minimization of transportation costs or distances travelled. In such cases, it can be helpful to summarize the necessary data in from–to charts like those in Table 6-4 and Table 6-4 displays the distance between the centres of the Table 6-5. locations shown in Figure 6-17. Table 6-5 indicates actual or projected workflow between departments (loads per day). For instance, the distance chart reveals that a trip from location A to location B will involve a distance of 20 metres. (Distances are often measured between department centres.) Oddly enough, the length of a trip between locations A and B may differ depending on the direction of the trip—due to one-way routes, elevators, or other factors. To simplify the discussion, assume a constant distance between any two locations regardless of direction. However, it is not realistic to assume that interdepartmental work flows are equal—there is no reason to suspect that department 1 will send as much work to department 2 as department 2 sends to 1. For example, several departments may send goods to packaging, but packaging may send only to the shipping department. TABLE 6-4 Distance between centres of locations (metres) Location From To A B C A – 20 40 B - – 30 C - - – TABLE 6-5 From–to departmental workflow (loads per day) Department From To 1 2 3 1 – 30 170 2 -- – 100 3 -- -- – FIGURE 6-17 Departments must be assigned to locations. Transportation costs can also be summarized in from-to charts, but we shall avoid that complexity, assuming instead that costs are a direct, linear function of distance. In practice, there are a large number of possible assignments. For example, 14 departments can Page 247 be assigned to 14 locations in more than 87 billion different ways (equal to 14 × 13 × 12 × 11 × 10 × 9 × 8 × 7 × 6 × 5 × 4 × 3 × 2 × 1, which is called “14 factorial,” and written as “14!”). This makes finding an optimal solution difficult. Often planners must rely on a heuristic to obtain a good, but not necessarily optimal, solution. A reasonable heuristic is to locate departments with high interdepartmental workflow as close together as possible. EXAMPLE 6-4 With the goal of minimizing total transportation cost, assign the three departments shown in Table 6-5 to locations A, B, and C from Figure 6-17, which are separated by the distances shown in Table 6-4. Assume that the cost per metre to move any load is $1. Assume that distances between centres of departments are independent of direction of flow (i.e., the from–to distance chart is symmetrical). SOLUTION Ranking departments according to highest work flow and ranking locations according to highest inter-location distances helps in making assignments. Trip Distance (metres) Department Pair Work Flow A–B 20 1–3 170 B–C 30 2–3 100 A–C 40 1–2 30 From these listings, you can see that departments 1 and 3 have the highest interdepartmental work flow, and that locations A and B are the closest. Thus, it seems reasonable to consider assigning 1 and 3 to locations A and B, although it is not yet obvious which department should be assigned to which location. Further inspection of the work flow list reveals that 2 and 3 have higher work flow than 1 and 2, so 2 and 3 should probably be located more closely than 1 and 2. Hence, it would seem reasonable to place 3 between 1 and 2, or at least centralize that department with respect to the other two. The resulting assignments might appear as illustrated in Figure 6-18. FIGURE 6-18 Interdepartmental work flows for assigned departments If the cost per metre to move any load is $1, you can compute the total daily transportation cost for this assignment by multiplying each department’s number of loads by the trip distance and summing those quantities: Department Number of Loads Between Location Distance To: 1 2: 30 A C: 40 30 × 40 = 1,200 B: 20 170 × 20 = 3,400 B: 30 100 × 30 = 3,000 3: 170 2 3: 100 C Loads × Distance 7,600 At $1 per load metre, the cost for this assignment is $7,600 per day. Even though it might appear that this arrangement yields the lowest transportation cost, you cannot be absolutely positive of that without actually computing the total cost for every alternative and comparing it to this one. Instead, rely on the choice of reasonable heuristic rules, such as those demonstrated previously, to arrive at a satisfactory, if not optimal, solution. Closeness Ratings The preceding approach assumes that there is only one objective, the total transportation cost. Richard Muther developed a more general approach that uses the importance of closeness or remoteness of each pair of departments to managers.7 This information is then summarized in a grid like that shown in Figure 6-19. The letters represent the importance of closeness for each department pair, with A being absolutely necessary, E being very important, and X representing an undesirable pairing. Thus, in the grid below it is “absolutely necessary” to locate departments 1 and 2 close to each other because there is an A at the intersection of those departments on the grid. On the other hand, departments 1 and 4 should not be close together because their intersection has an X. In practice, the letters on the grid are often accompanied by numbers that indicate the reason for each closeness rating; they are omitted here to simplify the illustration. Muther suggests the following reasons for closeness/remoteness: 1. Use same equipment or facilities. Page 248 2. Share the same personnel. 3. Sequence of workflow. 4. Ease of communication. 5. Unsafe or unpleasant conditions. 6. Similar work performed. FIGURE 6-19 A simplified Muther grid Muther suggests that closeness ratings in the grid first be used to draw a relationship graph, using the A and X ratings, but keeping E ratings in mind. Then this graph is fitted onto the floor plan. Example 6-5 illustrates this heuristic. EXAMPLE 6-5 Assign the six departments in SOLUTION Figure 6-19 to a 2 × 3 set of locations. Critical pairs of departments are those with A or X ratings. Prepare a list of those by referring to the grid: A X 1–2 1–4 1–3 3–4 2–6 3–6 3–5 4–6 5–6 Next, form a cluster of A links, beginning with the department that appears most frequently in the A list (in this case, department 6): Take the remaining departments in order of number of appearance in the A list, and add them to the above main cluster, rearranging the cluster as necessary. Form separate clusters for departments that do not link with the main cluster. In this case, all departments link with the main cluster. Next, graphically portray the Xs as “separation” cluster(s): Finally, fit the As cluster into a 2 × 3 arrangement, keeping X separations in mind: Note that alternative solutions are possible. For this solution, the E rating has also been satisfied, even though no attempt was made to explicitly consider it. Naturally, not every problem will yield the same results, so it may be necessary to do some additional adjusting to see if improvements can be made, keeping in mind that the A and X assignments deserve the greatest consideration. Note that departments may be considered close not only when they touch side to side, but also when they touch corner to corner. However, side-by-side departments are closer. Page 249 Computer Software The difficulty and significant time required to accurately draw and visualize factory equipment and flows and to analyze the production process has led to the development of a number of computer software programs. One example is the Plant Design & Optimization module of the Tecnomatix software made by Siemens. This family (FactoryCAD, FactoryFlow, and Plant Simulation) provides icons for graphical display, calculates total material flow distances, uses several heuristics to determine a good layout, performs simulation of material flow, and provides 3D walk-through. Another software is the Factory Design module of Autodesk, which does visualization and analysis similar to the Siemens software. In particular, it has icons for equipment that easily snap together and unsnap, facilitates new equipment drawing, allows easy 2D (AutoCAD) to 3D (Inventor) conversion, and helps identify interferences (e.g., a pillar blocking product movement). SUMMARY Process design determines the structure of a process—the sequence of operations (the workflow), resources, and controls needed for a particular process. Production process types include job shop, batch, repetitive, continuous flow, and project. Job shop is used for many low-quantity customized products. Batch process is used for few medium-quantity standard products that are produced in batches. Repetitive and continuous processes are used for one or two high-quantity/volume standard products. Project is used in situations that have a unique set of objectives to be accomplished in a limited time frame and with limited budget, that are not ongoing but instead are of limited duration. Automation is used to reduce the production costs and improve quality and speed. Examples include numerically controlled machines. Green technologies involve creation of goods using processes that are non-polluting while conserving energy and natural resources. Process design methodology involves finding a sequence of operations to produce the good or service, testing it, and finalizing it by determining the machines and plant layout. A process flow diagram is used to display the sequence of operations on materials in manufacturing. A service blueprint is similar to a process flow diagram, but follows the flow of customers. A swim lane diagram is similar to a service blueprint, but it groups the operations/activities by functions/roles. Facility layout design is used to determine the location of the machines and departments on the facility floor. A product layout is for a high-volume standardized product. Workers and equipment are arranged according to the technological sequence required by the product. Emphasis in design is on workflow through the system, and specialized processing and handling equipment is used. Process layouts group similar activities into departments or work centres. They can handle a wide range of processing requirements. However, this necessitates continual routing and scheduling. The rate of output is generally much lower than that of product layouts. In fixed-position layouts, the product or project being worked on remains stationary, and workers, materials, and equipment are moved about as needed. In cellular layout (a hybrid layout), different pieces of machinery are arranged in a “U” shape to process a group of similar products or parts. The other hybrid layout is flexible manufacturing system (FMS), which includes a group of machining centres, controlled by a computer, with automatic material handling, robots, or other automated equipment. They can produce a variety of similar products. The main effort in product layout design is assembly line balancing, which focuses on assigning assembly tasks to workstations so that the time requirements for the workstations are as equal as possible. In process layout design, efforts focus on the relative positioning of departments to minimize total transportation cost or to meet other requirements concerning the closeness of certain department pairs. KEY TERMS 3D printer assembly line automation batch process cellular layout computer-integrated manufacturing (CIM) continuous process cycle time fixed-position layout flexible manufacturing system (FMS) green technology group technology industrial robot intermittent processing job shop layout line balancing make or buy numerically controlled (N/C) machines percentage idle time precedence network process design process flow diagram process layout product layout product or service profiling Page 250 production line project repetitive process service blueprint support process swim lane diagram technological innovation technology SOLVED PROBLEMS Problem 1 The tasks shown in the following precedence diagram are to be assigned to workstations with the intent of minimizing idle time. Management has designed an output rate of 275 units per day. Assume 440 minutes are available per day. a. Determine the appropriate cycle time. b. What is the minimum number of stations possible? c. Assign tasks using the “positional weight” rule: Assign tasks with highest following times (including a task’s own time) first. Break ties using greatest number of following tasks. d. Compute efficiency. Page 251 Solution a. Cycle time= Operating time 440 minutes per day = Desired output ∑ b. N = t Cycle time = 1.6 minutes per unit 275 units per day 4.2 = 1.6 minutes = 2.625 (round to 3) c. Add positional weights (task time plus the sum of all following times) to the diagram. Start at the right end and work backward: Station Time Remaining* Eligible Will Fit Assign Task/Time 1 1.6 a, b a, b b/0.6 1.0 a, d a a/0.3 0.7 c, d c c/0.4 0.3 e, d e e/0.2 0.1 g, d g g/0.1 0 — — — 1.6 d d d/1.2 0.4 f none none 1.6 f f f/0.6 1.0 h h h/0.5 0.5 i i i/0.3 0.2 — — — 2 3 Station Idle Time 0 0.4 0.2 0.6 The resulting assignments are shown as follows. d. Ef f iciency = 100% − Percent idle time = 100% − 0.6 min. 3 × 1.6 min. 100 = 87.5% Problem 2 Assign nine automobile service departments to bays in a 3 × 3 floor grid so that the closeness ratings in the following Muther grid are satisfied. Only A, E and X ratings are shown. The location of department 4 must be in the middle right-hand side of the floor grid. Page 252 Solution Department 1 has most A ratings, so make it the centre position in the cluster. After connecting all the other departments with A rating to department 1 and adding the other A ratings, we get the cluster: Next, we can identify the clusters of departmental pairings that should be avoided: The departments in each X cluster should be spaced around the perimeter of the grid. Placing the A cluster on the floor plan with department 1 in the centre room and arbitrarily starting with department 6 in the top right room, we get: Now, using the X clusters, it follows that we should move departments 5 and 7 one room to the right and place department 8 in the bottom left room, so that department 5 is not close to department 9 and department 8 is not close to department 4. The following final floor plan results: Page 253 Problem 3 Five departments, 1 to 5, are to be assigned to locations B–F in the grid below. For technical reasons, department 6 must be assigned to location A. Transportation cost is $2 per metre. The objective is to minimize total transportation cost. Information on from–to departmental workflows and distances between centres of locations is shown in the following tables. Use the heuristic given in the section “Minimizing Transportation Costs or Distances.” Calculate the total transportation cost. Distance Between Centres of Locations (metres) From A B C D E F To A B C D E F — 50 100 50 80 130 — 50 90 40 70 — 140 60 50 — 50 120 — 50 — From–To Departmental Workflows (number of trips per day) From To 1 2 3 4 5 6 1 — 90 25 23 11 18 2 35 — 8 5 10 16 3 37 2 — 1 0 7 4 41 12 1 — 4 0 5 14 16 0 9 — 3 6 32 38 13 2 2 — Solution First, determine the total interdepartmental workflows (e.g., for 1–2 the flow is 90 + 35 = 125) because the distances are symmetric. Then, arrange them from high to low. Pair of Departments Workflow 1–2 125 1–4 64 1–3 62 2–6 54 1–6 50 2–5 26 1–5 25 3–6 20 2–4 17 4–5 13 2–3 10 5–6 5 Pair of Departments Workflow 3–4 2 4–6 2 3–5 0 From this, we can see that departments 1 and 2 have the greatest interdepartmental Page 254 workflow, so they should be closest, perhaps at B and E (which have the smallest between-centres distance). However, since workflow between 2 and 6 is larger than between 1 and 6, place department 1 in location E and department 2 in location B. Next, workflow between 1 and 4 is highest. The workflow between 4 and 6 is low, suggesting that they need not be close. Therefore, place department 4 in F. Next, workflow between 1 and 3 is highest. Hence, place department 3 in location D. Finally, department 5 has to be placed at location C. Total cost: Pair of Dept. b Distance c Workflow (b × c × $2) Cost 1–2 (B–E) 40 125 $10,000 1–3 (D–E) 50 62 6,200 1–4 (F–E) 50 64 6,400 1–5 (E–C) 60 25 3,000 1–6 (A–E) 80 50 8,000 2–3 (B–D) 90 10 1,800 2–4 (B–F) 70 17 2,380 2–5 (B–C) 50 26 2,600 2–6 (A–B) 50 54 5,400 3–4 (F–D) 120 2 480 3–5 (D–C) 140 0 0 DISCUSSION AND REVIEW QUESTIONS 1. Define process selection and describe its importance. LO1 2. Briefly describe the five production process types and give a manufacturing example for each that is not mentioned in the chapter. LO1 3. Give a service example for each of the five production process types. LO2 4. List the advantages and disadvantages of automation in production. LO3 5. List and briefly describe computer-aided approaches to production. LO3 6. What is a numerically controlled machine? LO3 7. Describe the methodology for process design. 8. What is a process flow diagram? LO4 LO4 LO4 9. What are the differences between process design for services versus goods? 10. Describe the general approach for layout design. LO5 11. Relate process and product layout to production process types. LO5 12. What are the main advantages of a product layout? The main disadvantages? LO5 13. What are the main advantages of a process layout? The main disadvantages? LO5 14. Why are routing and scheduling continual problems in process layouts? LO5 15. Compare machine/equipment maintenance strategies in product and process layouts. LO5 16. Briefly outline the impact that job operations sequence has on each of the layout types. LO5 17. A city transportation planning committee must decide whether to begin a long-term project to build a subway system or to upgrade the present bus service. Suppose you are an expert in fixed-path and variable-path material-handling equipment, and the committee seeks your counsel on this matter. What are the advantages and limitations of the subway and bus systems? LO5 18. Why are product layouts atypical in service environments? LO5 19. According to a study, it costs more than three times the original purchase price in parts and labour to fix a totally wrecked automobile. Explain the reasons for this large discrepancy. LO1 & LO5 20. How can a layout help or hinder productivity? LO5 21. What is a cellular layout? What are its main benefits and limitations? 22. What is group technology? LO5 LO5 23. What is the goal of line balancing? What happens if a line is unbalanced? LO6 24. Explain the consequence of task-time variability on line balancing and how to deal with it. LO6 25. What is the main objective of process layout design? LO7 26. What is a green technology? Give an example of a green technology. 27. What is a service blueprint? LO3 LO4 28. What is a swim lane diagram and when should it be used? LO4 29. How is the layout of an Apple store different from the layout of another store such as Best Buy? LO5 30. What are the trade-offs that occur when a process layout is used? What are the trade-offs that occur when a product layout is used? LO5 TAKING STOCK 1. Name a major trade-off in (a) production process design and (b) each type of layout design. LO4 & Page 255 LO5 2. Who needs to be involved in production process selection? Layout design? LO4 & LO5 3. Who needs to be involved in process selection? LO1 & LO4 4. In what ways does technology have an impact on production process design? Layout design? LO2 & LO6 CRITICAL THINKING EXERCISES 1. When would automation be feasible? LO2 2. Layout decisions affect a wide range of facilities, from factories, grocery stores, offices, department stores, and warehouses, to malls, parking lots, and kitchens. Layout is also important in the design of some products such as the interiors of cars and computers. Select three different items from above and list one or two key considerations (objectives) for the item’s layout design. LO4 3. What is the risk of automating a production process? Give an example. LO2 4. Consider an assembly line such as the burrito assembly line at Chipotle Mexican Grill. During slow times of the day, one server can handle assembly, but during very busy times, having many servers would be prudent. Explain why either approach wouldn’t work all the time, and the benefit of matching the number of servers to the pace of customer arrivals. LO5 PROBLEMS Page 256 1. An assembly line with 17 tasks needs to be balanced. The longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. The line will operate for 450 minutes per day. Page 257 LO6 a. What are the minimum and maximum cycle times? Page 258 b. What range of output is theoretically possible for the line? c. What is the minimum number of workstations needed if the maximum output Page 259 rate is sought? d. What cycle time will provide an output rate of 125 units per day? e. What output potential will result if the cycle time is (i) 9 minutes? (ii) 15 minutes? 2. A manager wants to assign tasks to workstations to achieve an hourly output rate of 33 units. Assume that the shop works 60 minutes per hour (i.e., no breaks). LO6 a. Assign the tasks shown in the following precedence network (times are on the nodes and are in minutes) to workstations using the following heuristic rules: (i) “Assign the task with the most followers.” (ii) Tiebreaker: “Assign the task with the longest time.” b. What is the efficiency? 3. A manager wants to assign tasks to workstations in order to achieve an hourly output rate of four units. The department uses a working time of 56 minutes per hour. LO6 a. Assign the tasks shown in the following precedence network (times are on the nodes and are in minutes) to workstations using the following heuristic rules: (i) “Assign the task with the largest positional weight.” (ii) Tiebreaker: “Assign the task with the longest time.” If a tie still exists, choose randomly. b. What is the efficiency? 4. A large manufacturer of pencil sharpeners is planning to add a new sharpener, and you have been asked to balance the assembly line, given the following task times and precedence relationships. Assume that cycle time is 1.3 minutes per unit. Task Time Immediate Task (minutes) Predecessors a 0.2 -- b 0.4 a c 0.3 -- d 1.3 c, b e 0.1 -- f 0.8 e g 0.3 f, d h 1.2 g a. Do each of the following: i. Draw the precedence network. LO6 ii. Assign the tasks to workstations using the heuristic rule “Assign the task with the most followers.” Break ties using the heuristic rule “Assign the task with the longest time.” iii. Determine the percentage idle time. iv. Calculate the rate of output that could be expected for this line assuming a 420- minute working day. b. Answer these questions: i. What is the shortest cycle time that will permit the use of only two workstations? Identify the tasks you would assign to each workstation. ii. Determine the percentage idle time that would result if two workstations were used. iii. What is the daily output under this arrangement? 5. As part of a major plant renovation project, the industrial engineering department has been asked to balance a revised assembly line to achieve an output rate of 240 units per eight-hour day. Duration and precedence relationships are as follows: Duration Immediate Task (minutes) Predecessors a 0.2 -- b 0.4 a c 0.2 -- d 0.4 c, b e 1.2 -- f 1.2 e g 1.0 d, f LO6 a. Draw the precedence network. b. Determine the required cycle time. c. Determine the minimum number of workstations needed. d. Assign the tasks to workstations using the heuristic rule “Assign the task with the most followers.” Use the heuristic rule “Assign the task with the longest time” as a tiebreaker. If a tie still exists, choose randomly. e. Calculate the percentage idle time for the assignments in part d. 6. Twelve tasks, with times and precedence requirements as shown in the following table, are to be assigned to workstations using a cycle time of 1.5 minutes. Heuristic rule “Assign the task with the most followers” will be tried. The tiebreaker will be the heuristic rule “Assign LO6 the task with the longest time.” Task Time Immediate Task Time Immediate Task (minutes) Predecessors Task (minutes) Predecessors a 0.1 – g 0.4 f b 0.2 a h 0.1 g c 0.9 b i 0.2 h d 0.6 c j 0.7 i e 0.1 – k 0.3 j f 0.2 d, e l 0.2 k a. Draw the precedence network. b. Assign tasks to workstations. c. Calculate the percentage idle time. 7. For the following tasks: LO6 a. Develop the precedence network. b. Determine the cycle time (in seconds) for a desired output rate of 500 units in a seven- hour day. c. Determine the minimum number of workstations for an output rate of 500 units per day. d. Balance the line using the “Assign the task with the most followers” heuristic rule. Break ties with the “Assign the task with the longest time” heuristic rule. Use a cycle time of 50 seconds. e. Calculate the percentage idle time for the line. Task Task Time (seconds) Immediate Predecessors A 45 — Task Task Time (seconds) Immediate Predecessors B 11 A C 9 B D 50 — E 26 D F 11 E G 12 C H 10 C I 9 F, G, H J 10 I 193 8. A shop works a 400-minute day. The manager of the shop wants an output rate of 200 units per day for the assembly line that has the tasks shown in the following table. Do the following: LO6 a. Construct the precedence network and calculate the cycle time. b. Assign tasks according to “Assign the task with the most followers” rule. In the case of a tie, use “Assign the task with the longest time” heuristic rule. c. Calculate the percentage idle time. Immediate Task Time Immediate Task Time Task Predecessors (minutes) Task Predecessors (minutes) a – 0.5 g e 0.4 b a 1.4 h g 0.3 c a 1.2 i f 0.5 d a 0.7 j e, i 0.8 e b, c 0.5 k h, j 0.9 f d 1.0 m k 0.3 9. Arrange six departments into a 2 × 3 floor grid so that these conditions are satisfied: 1 is close to 2; 5 is close to 2, 4, and 6; and 3 is not close to 1 or 2. LO7 10. Using the information given in the preceding problem, develop a Muther grid using the letters A, and X. Leave any pair of combinations not mentioned blank. LO7 11. Using the information in the following Muther grid, determine the department locations on the following floor plan. Note that departments 1 and 7 must be in the locations shown. LO7 12. Arrange the eight departments shown in the following Muther grid into a 2 × 4 floor plan. Note: Department 2 must be in the location shown. LO7 13. Arrange nine departments into a 3 × 3 floor grid so that they satisfy the conditions shown in the following Muther grid. Place department 5 in the lower left corner of the 3 × 3 floor grid. LO7 14. Determine the placement of departments on the following floor plan that will minimize total transportation cost using the data in the following tables. Assume that reverse distances are the same. Use a cost of $1 per trip metre. Use the heuristic in the section “Minimizing Transportation Costs or Distances.” LO7 Distance Between Centres of Locations (metres) From To A B C D Distance Between Centres of Locations (metres) From To A A B C D – 40 80 70 – 40 50 – 60 B C D – Number of Trips per Day From–To Departments From To 1 1 2 3 4 – 10 20 30 – 40 40 – 25 30 – 2 3 4 50 50 15. Eight work centres must be arranged in an L-shaped building. The locations of work centres 1 and 3 have already been assigned as shown in the following diagram. Assuming that transportation costs are $1 per load per metre, develop a suitable layout that minimizes total transportation cost using the information given below. (Assume the reverse distances are the same.) Use the heuristic in the section “Minimizing LO7 Transportation Costs or Distances.” Distance (metres) From A To A B C D E F G H – 40 40 60 120 80 100 110 Distance (metres) From To A B B C D E F G H – 60 40 60 140 120 130 – 45 85 40 70 90 – 40 50 40 45 – 90 50 40 – 40 60 – 40 C D E F G H – Loads per Day From To 1 2 3 4 5 6 7 8 1 – 10 5 90 365 135 125 0 2 0 – 140 10 0 35 0 120 3 0 220 – 110 10 0 0 200 4 0 110 240 – 10 0 0 170 5 5 40 100 180 – 10 40 10 6 0 80 40 70 0 – 10 20 7 0 45 20 50 0 40 – 20 8 0 0 0 20 0 0 0 – 16. Develop a process layout that will minimize the total distance travelled by patients at a medical clinic using the following information on projected departmental visits by patients and distance between locations. Assume a distance of 35 feet between the reception area and each potential location. Use the floor plan shown below. Use the heuristic in the section “Minimizing Transportation Costs or Distances.” LO7 Distance Between Centres of Locations (feet) From A To A B C D E F – 20 60 80 120 160 Distance Between Centres of Locations (feet) From To A B B C D E F – 40 60 80 120 – 40 60 80 – 40 60 – 40 C D E F – Trips From–To Departments (per day) From To 1 2 3 4 5 6 Reception Reception 10 10 200 20 0 100 – 1 – 0 0 80 20 40 10 2 0 – 0 0 0 20 40 3 40 0 – 10 190 10 10 4 30 50 0 – 10 70 0 5 60 40 60 30 – 20 10 6 10 100 0 20 0 – 30 17. Ten labs should be assigned to the circular floor plan shown below. Recalling a similar layout’s congestion in the halls, the new lab manager has requested an assignment that will minimize traffic between offices, but movement in the hall is restricted to a counterclockwise route. Develop a suitable layout using the following information. Assign Lab 1 to Location A, Lab 2 to Location I, and Lab 8 to Location E. LO7 Number of Trips per Day From–To Labs From To 1 2 3 4 5 6 7 8 9 10 1 — 40 1 20 20 4 0 2 6 5 2 0 — 2 15 25 10 2 12 13 6 3 50 35 — 10 13 4 0 4 7 1 4 6 1 8 — 0 14 10 20 22 11 5 3 2 7 35 — 22 5 9 19 10 6 5 5 10 0 2 — 15 0 1 20 7 20 16 50 4 9 2 — 1 3 0 8 10 6 14 2 4 44 13 — 1 25 9 5 5 18 1 2 40 30 42 — 32 10 30 30 35 20 15 5 40 10 15 — 18. Draw a process flow diagram for preparing a personal income tax return. LO4 19. Draw a process flow diagram for mass producing potato chips. Start with trucks bringing potatoes to the plant. (Hint: First imagine how this can be done at home on a small scale and then try to convert the process to large-scale mass production. You may watch www.yo utube.com/watch?v=ho-Az4mhaXY.) LO4 20. Draw a process flow diagram for batch production of bagels, as done by, for example, Great Canadian Bagel Company. (Hint: First imagine how this can be done at home (it is similar to making bread) and then try to convert the process to batch production at a store.) LO4 21. A pencil is made from a graphite rod and wooden body (plus a metal band and eraser at one end). a. Given the graphite rod, come up with two different ways (concepts) of manufacturing a pencil (ignore the metal band and eraser). LO4 b. Draw a process flow diagram for mass producing a pencil. You may use the photos and descriptions from “How a Pencil is Made” on GeneralPencil.com. Richard Hutchings/Digital Light/McGraw-Hill Education 22. The tasks performed in a cafeteria to serve a customer and the average service times are as follows: LO6 Service Time per Customer Tasks (seconds) Serve 25 vegetables Serve entree 30 Serve soup 20 Serve dessert 15 Serve drink 10 Collect money 60 The only precedence relationship is that “collect money” has to be last. The current layout performs these tasks in the sequence given; each task is performed by one worker except that only one worker serves both dessert and drink. a. i. Draw the precedence network. ii. What is the maximum number of customers who can be served per hour (capacity) using the current layout? iii. Assuming that capacity in part ii equals desired output, what are the cycle time and minimum number of workstations (workers) needed? iv. Suppose that capacity has to be increased. Where can the sixth worker be employed, assuming that equipment is not a constraint? v. How can we keep the same number of workers (five) but change the process in order to increase the capacity? b. Using Cycle time = 35 seconds and “Assign the task with the longest time” as the heuristic rule, balance the assembly line, and calculate the percentage idle time. (Hint: Using parallel workstations is allowed.) MINI-CASES Page 260 Mini-Case School ChairsE School chairs are usually made of plastic and metal, costing anywhere from $30 to $100 each. You wish to evaluate the idea of manufacturing wooden chairs for sale to schools, churches, etc. You have found the following design for a chair. Source: Based on H. Quesada and R. Gazo, “Development of a Manufacturing System for Construction of School Furniture,” Forest Products Journal 53(9), September 2003, pp. 47–54. Most wooden chairs are made of hardwoods such as oak, maple, cherry, or cedar. Suppose that cedar is the cheapest where you live. The dimensions of the parts of the chair are as follows: Dimension (inches; thickness, width, Item Number length) Back post 2 2 × 2 × 36 Front post 2 2 × 2 × 18 Cross-bar 10 1 × 1 × 14 Dimension (inches; thickness, width, Item Number length) Rails 3 2 × 1 × 14 Seat 1 1 × 16 × 16 The most economical size of cedar lumber is 2” × 4” × 8’ (i.e., 2 inches thick by 4 inches wide by 8 feet long). Therefore, you intend to buy only this size. Questions 1. Calculate the number of pieces of this lumber that you will need per chair. 2. Determine the operations needed to make the chair and draw a process flow diagram. Note that the cross-bars and rails have a tenon (a small round tip) on each end that will go in the mortise (the hole) of the posts. These have to be made. Also, the seat’s corners have to be cut to allow for the posts. Mini-Case A Safe Hospital Room of the FutureF No one expects a stay in a hospital room to be unsafe or to have to endure disruptions in their care, although today, there is need for improvement in hospital room safety and patient care. The following are suggestions for an improved hospital room of the future. 1. Double-sided linen closets allow staff to restock supplies without disturbing the patient. 2. Bar codes increase safety by matching the right medicine to the right patient. 3. A hand-washing station in every room gives care providers a place to wash their hands. 4. A sliding glass door doubles as a whiteboard for information exchanges. 5. Hand bars on all sides of the bathroom help patients navigate more safely. 6. Bed alarms alert nurses that a patient may be attempting to get out of bed unassisted. 7. Disinfecting units use ultraviolet light to kill germs. 8. Checklists give care providers a set of proven rules for preventing infections. 9. Vents suck the air out of the rooms of sick patients, filter it, and then release it from the building. 10. “Smart” pumps deliver fluids, nutrients, and medicines to patients at precisely controlled rates. 11. Kits for fall prevention include colour-coded nonslip socks, lap blanket, and wristband. 12. Frequently touched surfaces, such as IV poles, bed rails and faucets, are made with germ-resistant copper alloys, which are naturally antimicrobial. 13. Infrared technology that lights up the sink reminds health care providers to wash their hands. 14. Beds with translation technology help staff speak with all patients. 15. Real-time vital signs—heart rate, blood pressure—can be monitored from computers outside the room. Questions 1. If you have experienced a hospital room, as either a patient or a visitor, which of these features were present in that room? 2. If you have experienced a hospital room, which of these features were missing, but would have been desirable additions? To access “Linear Programming,” the supplement to Connect. Chapter 6, please visit SUPPLEMENT TO CHAPTER 6 Linear Programming Page 6S-1 LEARNING OBJECTIVES After completing this chapter, you should be able to: LO1 Describe the type of problem that would lend itself to a solution using linear LO2 LO3 LO4 programming and formulate a linear programming model from a description of a problem. Solve simple linear programming problems using the graphical method. Interpret computer solutions of linear programming problems. Do sensitivity analysis on the solution to a linear programming problem. SUPPLEMENT OUTLINE Introduction Linear Programming Models Graphical Linear Programming The Simplex Method Computer Solutions Sensitivity Analysis Kupicoo/Getty Images Linear programming is a powerful quantitative tool used by operations managers and other Page 6S-2 managers to obtain optimal solutions to problems that involve restrictions or limitations, such as budgets and available materials, labour, and machine time. These problems are referred to as constrained optimization problems. There are numerous examples of linear programming applications to such problems, including: Establishing locations for emergency equipment and personnel that will minimize response time Determining optimal schedules at airlines for planes, pilots, and ground personnel Developing financial plans Determining optimal blends of animal feed mixes Determining optimal diet plans Identifying the best set of worker–job assignments Developing optimal production schedules Developing shipping plans that will minimize shipping costs Identifying the optimal mix of products in a factory Performing production and service planning 6S.1 INTRODUCTION Linear programming (LP) techniques consist of a sequence of steps that will lead to an optimal solution to linear-constrained problems, if an optimal solution exists. There are a number of different linear programming techniques; some are special-purpose (i.e., used to find solutions for specific types of problems) and others are more general in scope. This chapter covers the two general-purpose solution techniques: graphical linear programming and computer solutions. Graphical linear programming provides a visual portrayal of many of the important concepts of linear programming. However, it is limited to problems with only two variables. In practice, computers are used to obtain solutions for problems, some of which involve a large number of variables. 6S.2 LINEAR PROGRAMMING MODELS LO1 Describe the type of problem that would lend itself to a solution using linear programming and formulate a linear programming model from a description of a problem. Linear programming models are mathematical representations of constrained optimization problems. These models have certain characteristics in common. Knowledge of these characteristics enables us to recognize problems that can be solved using linear programming. In addition, it also can help us formulate LP models. The characteristics can be grouped into two categories: components and assumptions. First, let’s consider the components. Four components provide the structure of a linear programming model: 1. Objective function 2. Decision variables 3. Constraints 4. Parameters Linear programming algorithms require that a single goal or objective, such as the maximization of profits, be specified. The two general types of objectives are maximization and minimization. A maximization objective might involve profits, revenues, efficiency, or rate of return. Conversely, a minimization objective might involve cost, time, distance travelled, or scrap. The objective function is a mathematical expression that can be used to determine the total profit (or cost, etc., depending on the objective) for a given solution. Decision variables represent choices available to the decision maker in terms of the amounts of either inputs or outputs. For example, some problems require choosing a combination of inputs to minimize total costs, while others require selecting a combination of outputs to maximize profits or revenues. Page 6S-3 Constraints are limitations that restrict the alternatives available to decision makers. The three types of constraints are less than or equal to (≤), greater than or equal to (≥), and simply equal to (=). A ≤ constraint implies an upper limit on the amount of some scarce resource (e.g., machine hours, labour hours, materials) available for use. A ≥ constraint specifies a minimum that must be achieved in the final solution (e.g., must contain at least 10 percent real fruit juice, must get at least 30 MPG on the highway). The = constraint is more restrictive in the sense that it specifies exactly what a decision variable should equal (e.g., make 200 units of product A). A linear programming model can ⎪ consist of one or more constraints. The constraints of a given problem define the set of combinations of the decision variables that satisfy all constraints; this set is referred to as the feasible solution space. Linear programming algorithms are designed to search the feasible solution space for the combination of decision variables that will yield an optimum in terms of the objective function. An LP model consists of a mathematical statement of the objective, as well as a mathematical statement of each constraint. These statements consist of symbols (e.g., x1, x2) that represent the decision variables and numerical values, called parameters. The parameters are fixed values; the model is solved given those values. Example 6S-1 illustrates an LP model. EXAMPLE 6S-1: Linear Programming Models Explained Here is an LP model of a situation that involves the production of three possible products, each of which will yield a certain profit per unit, and each requires a certain use of two resources that are in limited supply: labour and materials. The objective is to determine how much of each product to make to achieve the greatest possible profit while satisfying all constraints. ⎧ x 1 = Quantity of product 1 to produce Decision variables Maximize Subject to ⎨ x 2 = Quantity of product 2 to produce ⎩ x 3 = Quantity of product 3 to produce 5x 1 + 8x 2 + 4x 3 (prof it) Labour 2x 1 + 4x 2 + 8x 3 ≤ 250hours Material 7x 1 + 6x 2 + 5x 3 ≤ 100pounds Product 1 x 1 x1 , x2 , x3 (Objective f unction) (Constraints) ≥ 10 units ≥ 0 (Nonnegativity constraints) First, the model lists and defines the decision variables. These typically represent quantities. In this case, they are quantities of three different products that might be produced. Next, the model states the objective function. It includes every decision variable in the model and the contribution (profit per unit) of each decision variable. Thus, product x1 has a profit of $5 per unit. The profit from product x1 for a given solution will be 5 times the value of x1 specified by the solution; the total profit from all products will be the sum of the individual product profits. Thus, if x1 = 10,x2 = 0, and x3 = 6, the value of the objective function would be: 5(10) + 8(0) + 4(6) = 74 The objective function is followed by a list (in no particular order) of three constraints. Each constraint has a right-hand-side numerical value (e.g., the labour constraint has a right-hand-side value of 250) that indicates the amount of the constraint and a relation sign that indicates whether that amount is a maximum (≤), a minimum (≥), or an equality (=). The left-hand side of each constraint consists of the variables subject to that particular constraint and a coefficient for each variable that indicates how much of the right-hand-side quantity one unit of the decision variable represents. For instance, for the labour constraint, one unit of x1will require two hours of labour. The sum of the values on the left-hand side of each constraint represents the amount of that constraint used by a solution. x1 = 10, x2 = 0, and x3 = 6, the amount of labour used would be: 2(10) + 4(0) + 8(6) = 68 hours Because this amount does not exceed the quantity on the right-hand side of the constraint, it is said to be feasible. Note that the third constraint refers to only a single variable; x1 must be at least 10 units. Its implied coefficient is 1, although that is not shown. Finally, there are the nonnegativity constraints. These are listed on a single line; they reflect the condition that no decision variable is allowed to have a negative value. In order for LP models to be used effectively, certain assumptions must be satisfied: 1. Linearity. The impact of decision variables is linear in constraints and the objective function. 2. Divisibility. Noninteger values of decision variables are acceptable. 3. Certainty. Values of parameters are known and constant. 4. Nonnegativity. Negative values of decision variables are unacceptable. Page 6S-4 Model Formulation An understanding of the components of linear programming models is necessary for model formulation. This helps provide organization to the process of assembling information about a problem into a model. Naturally, it is important to obtain valid information on what constraints are appropriate, as well as on what values of the parameters are appropriate. If this is not done, the usefulness of the model will be questionable. Consequently, in some instances, considerable effort must be expended to obtain that information. In formulating a model, use the format illustrated in Example 6S-1. Begin by identifying the decision variables. Very often, decision variables are “the quantity of” something, such as x1 = the quantity of product 1. Generally, decision variables have profits, costs, times, or a similar measure of value associated with them. Knowing this can help you identify the decision variables in a problem. Constraints are restrictions or requirements on one or more decision variables, and they refer to available amounts of resources such as labour, material, or machine time, or to minimal requirements, such as “Make at least 10 units of product 1.” It can be helpful to give a name to each constraint, such as “labour” or “material 1.” Let’s consider some of the different kinds of constraints you will encounter. 1. A constraint that refers to one or more decision variables. This is the most common kind of constraint. The constraints in Example 6S-1 are of this type. 2. A constraint that specifies a ratio. For example, “The ratio of x1 to x2 must be at least 3 to 2.” To formulate this, begin by setting up the following ratio: x1 x2 3 ≥ 2 Then, cross multiply, obtaining 2x 1 ≥ 3x 2 This is not yet in a suitable form because all variables in a constraint must be on the left-hand side of the inequality (or equality) sign, leaving only a constant on the right-hand side. To achieve this, we must subtract the variable amount that is on the right side from both sides. That yields 2x 1 − 3x 2 ≥ 0 (Note that the direction of the inequality remains the same.) 3. A constraint that specifies a percentage for one or more variables relative to one or more other variables. For example, “x1 cannot be more than 20 percent of the mix.” Suppose the mix consists of variables x1, x2, and x3. In mathematical terms, this would be x 1 ≤ .20(x 1 + x 2 + x 3 ) As always, all variables must appear on the left-hand side of the relationship. To accomplish that, we can expand the right-hand side, and then subtract the result from both sides. Expanding yields x 1 ≤ .20x 1 + .20x 2 + .20x 3 Subtracting yields Page 6S-5 .80x 1 − .20x 2 − .20x 3 ≤ 0 Once you have formulated a model, the next task is to solve it. The following sections describe two approaches to a problem solution: graphical solutions and computer solutions. 6S.3 GRAPHICAL LINEAR PROGRAMMING LO2 Solve simple linear programming problems using the graphical method. Graphical linear programming is a method for finding optimal solutions to two-variable problems. This section describes that approach. Outline of Graphical Procedure The graphical method of linear programming involves plotting the constraint lines on a graph and identifying an area on the graph that satisfies all of the constraints. The area is referred to as the feasible solution space. Next, the objective function is plotted and used to identify the optimal point in the feasible solution space. The coordinates of the point can sometimes be read directly from the graph, although generally an algebraic determination of the coordinates of the point is necessary. The general procedure followed in the graphical approach is as follows: 1. Set up the objective function and the constraints in mathematical format. 2. Plot the constraints. 3. Identify the feasible solution space. 4. Plot the objective function. 5. Determine the optimum solution. The technique can best be illustrated through solution of a typical problem. Consider the problem described in Example 6S-2. EXAMPLE 6S-2: Graphing the Problem and Finding the Optimal Solution General description: A firm that assembles computers and computer equipment is about to start production of two new types of microcomputers. Each type will require assembly time, inspection time, and storage space. The amounts of each of these resources that can be devoted to the production of the microcomputers is limited. The manager of the firm would like to determine the quantity of each microcomputer to produce in order to maximize the profit generated by sales of these microcomputers. Additional information: In order to develop a suitable model of the problem, the manager has met with design and production personnel. As a result of those meetings, the manager has obtained the following information. Type 1 Type 2 Profit per unit $60 $50 Assembly time per unit 4 hours 10 hours Inspection time per unit 2 hours 1 hour Storage space per unit 3 cubic feet 3 cubic feet The manager also has acquired information on the availability of company resources. These (daily) amounts are as follows. Resource Amount Available Assembly time 100 hours Inspection time 22 hours Storage space 39 cubic feet The manager met with the firm’s marketing manager and learned that demand for the microcomputers was such that whatever combination of these two types of microcomputers is produced, all of the output can be sold. In terms of meeting the assumptions, it would appear that the relationships are linear: The Page 6S-6 contribution to profit per unit of each type of computer and the time and storage space per unit of each type of computer are the same regardless of the quantity produced. Therefore, the total impact of each type of computer on the profit and each constraint is a linear function of the quantity of that variable. There may be a question of divisibility because, presumably, only whole units of computers will be sold. However, because this is a recurring process (i.e., the computers will be produced daily; a noninteger solution such as 3.5 computers per day will result in 7 computers every other day), this does not seem to pose a problem. The question of certainty cannot be explored here; in practice, the manager could be questioned to determine if there are any other possible constraints and whether the values shown for assembly times, and so forth, are known with certainty. For the purposes of discussion, we will assume certainty. Last, the assumption of nonnegativity seems justified; negative values for production quantities would not make sense. Because we have concluded that linear programming is appropriate, let us now turn our attention to constructing a model of the microcomputer problem. First, we must define the decision variables. Based on the statement “The manager . . . would like to determine the quantity of each microcomputer to produce,” the decision variables are the quantities of each type of computer. Thus, x1 = quantity of type 1 to produce x2 = quantity of type 2 to produce Next, we can formulate the objective function. The profit per unit of type 1 is listed as $60, and the profit per unit of type 2 is listed as $50, so the appropriate objective function is Maximize Z = 60x1 + 50x2 where Z is the value of the objective function, given values of x1 and x2. Theoretically, a mathematical function requires such a variable for completeness. However, in practice, the objective function often is written without the Z as sort of a shorthand version. (That approach is underscored by the fact that computer input does not call for Z: It is understood. The output of a computerized model does include a Z, though.) Now for the constraints. There are three resources with limited availability: assembly time, inspection time, and storage space. The fact that availability is limited means that these constraints will all be ≤ constraints. Suppose we begin with the assembly constraint. The type 1 microcomputer requires 4 hours of assembly time per unit, whereas the type 2 microcomputer requires 10 hours of assembly time per unit. Therefore, with a limit of 100 hours available, the assembly constraint is 4x1 +10x2 ≤ 100 hours Similarly, each unit of type 1 requires 2 hours of inspection time, and each unit of type 2 requires 1 hour of inspection time. With 22 hours available, the inspection constraint is 2x1 + 1x2 ≤ 22 (Note: The coefficient of 1 for x2 need not be shown. Thus, an alternative form for this constraint is 2x1 + x2 ≤ 22.) The storage constraint is determined in a similar manner: 3x1 + 3x2 ≤ 39 There are no other system or individual constraints. The nonnegativity constraints are . x1, x2 ≥ 0 . In summary, the mathematical model of the microcomputer problem is . x1 = quantity of type 1 to produce 2 = quantity of type 2 to produce . Maximize 60x1 + 50x2 .x . Subject to Assembly 4x 1 + 10x 2 ≤ 100hours Inspection 2x 1 + 1x 2 ≤ 22hours Storage 3x 1 + 3x 2 ≤ 39cubic f eet x1 , x2 . The next step is to plot the constraints. ≥ 0 Page 6S-7 Plotting Constraints Begin by placing the nonnegativity constraints on a graph, as in plotting the other constraints is simple: Figure 6S-1. The procedure for 1. Replace the inequality sign with an equal sign. This transforms the constraint into an equation of a straight line. 2. Determine where the line intersects each axis. FIGURE 6S-1 Graph showing the nonnegativity constraints a. To find where it crosses the x2 axis, set x1 equal to zero and solve the equation for the value of x2. b. To find where it crosses the x 1 axis, set x2 equal to zero and solve the equation for the value of x1 3. Mark these intersections on the axes, and connect them with a straight line. (Note: If a constraint has only one variable, it will be a vertical line on a graph if the variable is x1, or a horizontal line if the variable is x2.) 4. Indicate by shading (or by arrows at the ends of the constraint line) whether the inequality is greater than or less than. (A general rule to determine which side of the line satisfies the inequality is to pick a point that is not on line, such as 0,0; solve the equation using these values; and see whether it is greater than or less than the constraint amount.) 5. Repeat steps 1–4 for each constraint. Consider the assembly time constraint: 4x1 + 10x2 ≤ 100 Removing the inequality portion of the constraint produces this straight line: 4x1 + 10x2 = 100 Next, identify the points where the line intersects each axis, as step 2 describes. Thus with x2 = 0, we find 4x1 + 10(0) = 100 Solving, we find that 4x1 = 100, so x1 = 25 when x2 = 0. Similarly, we can solve the Page 6S-8 equation for x2 when x1 = 0: 4(0) + 10x2 = 100 Solving for x2, we find x2 = 10 when x1 = 0. Thus, we have two points: x1 = 0, x2 = 10, and x1 = 25, x2 = 0. We can now add this line to our graph of the nonnegativity constraints by connecting these two points (see Figure 6S-2). FIGURE 6S-2 Plot of the first constraint (assembly time) Next, we must determine which side of the line represents points that are less than 100. To do this, we can select a test point that is not on the line, and we can substitute the x1 and x2 values of that point into the left-hand side of the equation of the line. If the result is less than 100, this tells us that all points on that side of the line are less than the value of the line (e.g., 100). Conversely, if the result is greater than 100, this indicates that the other side of the line represents the set of points that will yield values that are less than 100. A relatively simple test point to use is the origin (i.e., x1 = 0, x2 = 0). Substituting these values into the equation yields a value of zero. Obviously, this is less than 100. Hence, the side of the line closest to the origin represents the “less than” area (i.e., the feasible region). 1. 4(0) + 10(0) = 0 The feasible region for this constraint and the nonnegativity constraints then becomes the shaded portion shown in Figure 6S-3. FIGURE 6S-3 The feasible region, given the first constraint and the nonnegativity constraints For the sake of illustration, suppose we try one other point, say x1 = 10, x2 = 10. Substituting these values into the assembly constraint yields 1. 4(10) + 10(10) = 140 Clearly, this is greater than 100. Therefore, all points on this side of the line are greater than 100 (see Figure 6S-4). FIGURE 6S-4 The point (10, 10) is above the constraint line. Page 6S-9 Continuing with the problem, we can add the two remaining constraints to the graph. For the inspection constraint: 1. Convert the constraint into the equation of a straight line by replacing the inequality sign with an equality sign: 2x 1 + 1x 2 ≤ 22 becomes 2x 1 + 1x 2 = 22 2. Set x1 equal to zero and solve for x2: 2(0) + 1x2 = 22 Solving, we find x2 = 22. Thus, the line will intersect the x2 axis at 22. 3. Next, set x 2 equal to zero and solve for x1: 2x1 + 1(0) = 22 Solving, we find x1 = 11. Thus, the other end of the line will intersect the x1 axis at 11. 4. Add the line to the graph (see Figure 6S-5). FIGURE 6S-5 Partially completed graph showing the assembly, inspection, and nonnegativity constraints Note that the area of feasibility for this constraint is below the line ( Figure 6S-5). Again, the area of feasibility at this point is shaded in for illustration purposes. When graphing problems, it is more practical to refrain from shading in the feasible region until all constraint lines have been drawn. However, because constraints are plotted one at a time, using a small arrow at the end of each constraint to indicate the direction of feasibility can be helpful. The storage constraint is handled in the same manner: 1. Convert it into an equality: 3x1 + 3x2 = 39 2. Set x1 equal to zero and solve for x2: 3(0) + 3x2 = 39 Solving, x2 = 13. Thus, x2 = 13 when x1 = 0. 3. Set x2 equal to zero and solve for x1: 3x1 + 3(0) = 39 Solving, x1 = 13. Thus, x1 = 13 when x2 0. 4. Add the line to the graph (see Figure 6S-6). FIGURE 6S-6 Completed graph of the microcomputer problem showing all constraints and the feasible solution space Page 6S-10 Identifying the Feasible Solution Space The feasible solution space is the set of all points that satisfies all constraints. (Recall that the x1 and x2 axes form nonnegativity constraints.) The heavily shaded area shown in feasible solution space for our problem. Figure 6S-6 is the The next step is to determine which point in the feasible solution space will produce the optimal value of the objective function. This determination is made using the objective function. Plotting the Objective Function Line Plotting an objective function line involves the same logic as plotting a constraint line: Determine where the line intersects each axis. Recall that the objective function for the microcomputer problem is 60x1 + 50x2 This is not an equation because it does not include an equal sign. We can get around this by simply setting it equal to some quantity. Any quantity will do, although one that is evenly divisible by both coefficients is desirable. Suppose we decide to set the objective function equal to 300. That is, 60x1 + 50x2 = 300 We can now plot the line on our graph. As before, we can determine the x1 and x2 intercepts of the line by setting one of the two variables equal to zero, solving for the other, and then reversing the process. Thus, with x1 = 0, we have 60(0) + 50x2 = 300 Solving, we find x2 = 6. Similarly, with x2 = 0, we have 60x1 + 50(0) = 300 Solving, we find x1 = 5. This line is plotted in Figure 6S-7. FIGURE 6S-7 Microcomputer problem with $300 profit line added The profit line can be interpreted in the following way: It is an isoprofit line; every point on the line (i.e., every combination of x1 and x2 that lies on the line) will provide a profit of $300. We can see from the graph many combinations that are both on the $300 profit line and within the feasible solution space. In fact, considering noninteger as well as integer solutions, the possibilities are infinite. Suppose we now consider another line, say the $600 line. To do this, we set the objective function equal to this amount. Thus, 60x1 + 50x2 = 600 Solving for the x1 and x2 intercepts yields these two points: This line is plotted in x 1 intercept x 2 intercept x 1 = 10 x1 = 0 x2 = 0 x 2 = 12 Page 6S-11 Figure 6S-8, along with the previous $300 line for purposes of comparison. FIGURE 6S-8 Microcomputer problem with profit lines of $300 and $600 Two things are evident in Figure 6S-8 regarding the profit lines. One is that the $600 line is farther from the origin than the $300 line; the other is that the two lines are parallel. The lines are parallel because they both have the same slope. The slope is not affected by the right side of the equation. Rather, it is determined solely by the coefficients 60 and 50. It would be correct to conclude that regardless of the quantity we select for the value of the objective function, the resulting line will be parallel to these two lines. Moreover, if the amount is greater than 600, the line will be even farther away from the origin than the $600 line. If the value is less than 300, the line will be closer to the origin than the $300 line. And if the value is between 300 and 600, the line will fall between the $300 and $600 lines. This knowledge will help in determining the optimal solution. Consider a third line, one with the profit equal to $900. Figure 6S-9 shows that line along with the previous two profit lines. As expected, it is parallel to the other two, and even farther away from the origin. However, the line does not touch the feasible solution space at all. Consequently, there is no feasible combination of x1 and x2 that will yield that amount of profit. Evidently, the maximum Figure 6S-9. possible profit is an amount between $600 and $900, which we can see by referring to We could continue to select profit lines in this manner, and eventually could determine an amount that would yield the greatest profit. However, there is a much simpler alternative. We can plot just one line, say the $300 line. We know that all other lines will be parallel to it. Consequently, by moving this one line parallel to itself, we can “test” other profit lines. We also know that as we move away from the origin, the profits get larger. What we want to know is how far the line can be moved out from the origin and still be touching the feasible solution space, and the values of the decision variables at that point of greatest profit (i.e., the optimal solution). Locate this point on the graph by placing a straight edge along the $300 line (or any other convenient line) and sliding it away from the origin, being careful to keep it parallel to the line. This approach is illustrated in Figure 6S-10. FIGURE 6S-9 Microcomputer problem with profit lines of $300, $600, and $900 FIGURE 6S-10 Finding the optimal solution to the microcomputer problem Once we have determined where the optimal solution is in the feasible solution space, we must determine the values of the decision variables at that point. Then, we can use that information to compute the profit for that combination. Note that the optimal solution is at the intersection of the inspection boundary and the storage boundary, which is one of the corner points (see Figure 6S-10). In other words, the optimal combination of x1 and x2 must satisfy both boundary (equality) conditions. We can determine those values by solving the two equations simultaneously. The equations are: Inspection 2x 1 + 1x 2 = 22 Storage 3x 1 + 3x 2 = 39 The idea behind solving two simultaneous equations is to algebraically eliminate one of the Page 6S-12 unknown variables (i.e., to obtain an equation with a single unknown). This can be accomplished by multiplying the constants of one of the equations by a fixed amount and then adding (or subtracting) the modified equation from the other. (Occasionally, it is easier to multiply each equation by a fixed quantity.) For example, we can eliminate x2 by multiplying the inspection equation by 3 and then subtracting the storage equation from the modified inspection equation. Thus, 3(2x 1 + 1x 2 = 22) becomes 6x 1 + 3x 2 = 66 Subtracting the storage equation from this produces 6x 1 + 3x 2 = 66 −(3x 1 + 3x 2 = 39) ¯ 3x 1 + 0x 2 = 27 Solving the resulting equation yields x1 = 9. The value of x2 can be found by substituting x1 = 9 into either of the original equations or the modified inspection equation. Suppose we use the original inspection equation. We have 2(9) + 1x2 = 22 Solving, we find x2 = 4. Hence, the optimal solution to the microcomputer problem is to produce nine type 1 computers and four type 2 computers per day. We can substitute these values into the objective function to find the optimal profit: $60(9) + $50(4) = $740 Hence, the last line—the one that would last touch the feasible solution space as we moved away from the origin parallel to the $300 profit line—would be the line where profit equaled $740. In this problem, the optimal values for both decision variables are integers. This will not always be the case; one or both of the decision variables may turn out to be noninteger. In some situations, noninteger values would be of little consequence. This would be true if the decision variables were measured on a continuous scale, such as the amount of water, sand, sugar, fuel oil, time, or distance needed for optimality, or if the contribution per unit (profit, cost, etc.) were small, as with the number of nails or ball bearings to make. In some cases, the answer would simply be rounded down (maximization problems) or up (minimization problems) with very little impact on the objective function. Here, we assume that noninteger answers are acceptable as such. Let’s review the procedure for finding the optimal solution using the objective function approach: Page 6S-13 1. Graph the constraints. 2. Identify the feasible solution space. 3. Set the objective function equal to some amount that is divisible by each of the objective function coefficients. This will yield integer values for the x1 and x2 intercepts and simplify plotting the line. Often, the product of the two objective function coefficients provides a satisfactory line. Ideally, the line will cross the feasible solution space close to the optimal point, and it will not be necessary to slide a straight edge because the optimal solution can be readily identified visually. 4. After identifying the optimal point, determine which two constraints intersect there. Solve their equations simultaneously to obtain the values of the decision variables at the optimum. 5. Substitute the values obtained in the previous step into the objective function to determine the value of the objective function at the optimum. Redundant Constraints In some cases, a constraint does not form a unique boundary of the feasible solution space. Such a constraint is called a redundant constraint. Two such constraints are illustrated in Figure 6S-11. Note that a constraint is redundant if it meets the following test: Its removal would not alter the feasible solution space. FIGURE 6S-11 Examples of redundant constraints When a problem has a redundant constraint, at least one of the other constraints in the problem is more restrictive than the redundant constraint. Solutions and Corner Points The feasible solution space in graphical linear programming is typically a polygon. Moreover, the solution to any problem will always be at a corner point (intersection of constraints) of the polygon. It is possible to determine the coordinates of each corner point of the feasible solution space, and use those values to compute the value of the objective function at those points. Because the solution is always at a corner point, comparing the values of the objective function at the corner points and identifying the best one (e.g., the maximum value) is another way to identify the optimal corner point. Using the graphical approach, it is much easier to plot the objective function and use that to identify the optimal corner point. However, for problems that have more than two decision variables, and the graphical method isn’t appropriate, the “enumeration” approach is used to find the optimal solution. With the enumeration approach, the coordinates of each corner point are determined, and Page 6S-14 then each set of coordinates is substituted into the objective function to determine its value at that corner point. After all corner points have been evaluated, the one with the maximum or minimum value (depending on whether the objective is to maximize or minimize) is identified as the optimal solution. Thus, in the microcomputer problem, the corner points are x1 = 0, x2 = 10, x1 = 11, x2 = 0 (by inspection; see Figure 6S-10), and x1 = 9, x2 = 4 and x1 = 5, x2 = 8 (using simultaneous equations, as illustrated on the previous pages). Substituting into the objective function, the values are $500 for (0,10); $740 for (9,4); $660 for (11,0), and $700 for (5,8). Because (9,4) yields the highest value, that corner point is the optimal solution. In some instances, the objective function will be parallel to one of the constraint lines that forms a boundary of the feasible solution space. When this happens, every combination of x1and x2 on the segment of the constraint that touches the feasible solution space represents an optimal solution. Hence, there are multiple optimal solutions to the problem. Even in such a case, the solution will also be a corner point—in fact, the solution will be at two corner points: those at the ends of the segment that touches the feasible solution space. parallel to a constraint line. Figure 6S-12 illustrates an objective function line that is FIGURE 6S-12 Some LP problems have multiple optimal solutions. Minimization Graphical minimization problems are quite similar to maximization problems. There are, however, two important differences. One is that at least one of the constraints must be of the = or ≥ variety. This causes the feasible solution space to be away from the origin. The other difference is that the optimal point is the one closest to the origin. We find the optimal corner point by sliding the objective function (which is an isocost line) toward the origin instead of away from it. Page 6S-15 EXAMPLE 6S-3: Solving a Minimization Problem Solve the following problem using graphical linear programming. Minimize Z = 8x 1 + 12x 2 Subject to 5x 1 + 2x 2 ≥ 20 4x 1 + 3x 2 ≥ 24 x2 ≥ 2 x1 x2 ≥ 0 SOLUTION 1. Plot the constraints (shown in Figure 6S-13). a. Change the constraints to equalities. b. For each constraint, set x1 = 0 and solve for x2, then set x2 = 0 and solve for x1. c. Graph each constraint. Note that x 2 = 2 is a horizontal line parallel to the x1 axis and 2 units above it. 2. Shade the feasible solution space (see Figure 6S-13). 3. Plot the objective function. a. Select a value for the objective function that causes it to cross the feasible solution space. Try 8 × 12 = 96; 8x1 + 12x2 = 96 (acceptable). b. Graph the line (see Figure 6S-14). 4. Slide the objective function toward the origin, being careful to keep it parallel to the original line. 5. The optimum (last feasible point) is shown in Figure 6S-14. The x2 coordinate (x2 = 2) can be determined by inspection of the graph. Note that the optimum point is at the intersection of the line x2 = 2 and the line 4x1 + 3x2 = 24. Substituting the value of x2 = 2 into the latter equation will yield the value of x1 at the intersection: 4x1 + 3(2) = 24x1 = 4.5 Thus, the optimum is x1 = 4.5 units and x2 = 2. 6. Compute the minimum cost: 8x1 + 12x2 = 8(4.5) + 12(2) = 60 FIGURE 6S-13 The constraints define the feasible solution space. FIGURE 6S-14 The optimum is the last point the objective function touches as it is moved toward the origin. Slack and Surplus If a constraint forms the optimal corner point of the feasible solution space, it is called a binding cons traint. In effect, it limits the value of the objective function; if the constraint could be relaxed (less restrictive), an improved solution would be possible. For constraints that are not binding, making them less restrictive will have no impact on the solution. If the optimal values of the decision variables are substituted into the left-hand side of a binding constraint, the resulting value will exactly equal the right-hand value of the constraint. However, there will be a difference with a nonbinding constraint. If the left-hand side is greater than the right-hand side, we say there is surplus; if the left-hand side is less than the right-hand side, we say there is slack. Slack can only occur in a ≤ constraint; it is the amount by which the left-hand side is less than the righthand side when the optimal values of the decision variables are substituted into the left-hand side. And surplus can only occur in a ≥ constraint. It is the amount by which the left-hand side exceeds the righthand side of the constraint when the optimal values of the decision variables are substituted into the left-hand side. For example, suppose the optimal values for a problem are x1 = 10 andx2 = 20. If one of the constraints is Page 6S-16 3x1 + 2x2 ≤ 100 substituting the optimal values into the left-hand side yields 3(10) + 2(20) = 70 Because the constraint is ≤, the difference between the values of 100 and 70 (i.e., 30) is slack. Suppose the optimal values had been x1 = 20 and x2 = 20. Substituting these values into the left-hand side of the constraint would yield 3(20) + 2(20) = 100. Because the left-hand side equals the right-hand side, this is a binding constraint; slack is equal to zero. Now consider this constraint: 4x1 + x2 ≥ 50 Suppose the optimal values are x1 = 10 and x2 = 15; substituting into the left-hand side yields 4(10) + 15 = 55 Because this is a ≥ constraint, the difference between the left- and right-hand-side values is surplus. If the optimal values had been x1 = 12 and x2 = 2, substitution would result in the left-hand side being equal to 50. Hence, the constraint would be a binding constraint, and there would be no surplus (i.e., surplus would be zero). 6S.4 THE SIMPLEX METHOD The Simplex method is a general-purpose linear programming algorithm widely used to solve largescale problems. Although it lacks the intuitive appeal of the graphical approach, its ability to handle problems with more than two decision variables makes it extremely valuable for solving problems often encountered in operations management. Although manual solution of linear programming problems using simplex can yield a number of insights into how solutions are derived, space limitations preclude describing it here. However, it is available on the website that accompanies this book. The discussion here will focus on computer solutions. 6S.5 COMPUTER SOLUTIONS LO3 Interpret computer solutions of linear programming problems. The microcomputer problem will be used to illustrate computer solutions. We repeat it here for ease of reference. Maximize60x 1 + 50x 2 wherex 1 = the number of type 1 computers x2 = the number of type 2 computers Subject to Assembly 4x 1 + 10x 2 ≤ 100hours Inspection 2x 1 + 1x 2 ≤ 22hours Storage 3x 1 + 3x 2 ≤ 39cubic f eet x1 , x2 ≥ 0 Solving LP Models Using MS Excel Solutions to linear programming models can be obtained from spreadsheet software such as Microsoft’s Excel. Excel has a routine called Solver that performs the necessary calculations. To use Solver: 1. First, enter the problem in a worksheet, as shown in Figure 6S-15. What is not obvious Page 6S-17 from the figure is the need to enter a formula for each cell where there is a zero (Solver automatically inserts the zero after you input the formula). The formulas are for the value of the objective function and the constraints, in the appropriate cells. Before you enter the formulas, designate the cells where you want the optimal values of x1 and x2. Here, cells D4 and E4 are used. To enter a formula, click the cell that the formula will pertain to, and then enter the formula, starting with an equal sign. We want the optimal value of the objective function to appear in cell G4. For G4, enter the formula = 60*D4 + 50*E4 The constraint formulas, using cells C7, C8, and C9, are f or C7: = 4*D4 + 10*E4 f or C8: = 2*D4 + 1*E4 f or C9: = 3*D4 + 3*E4 FIGURE 6S-15 MS Excel worksheet for microcomputer problem Source: Microsoft Corporation 2. Now, to access Solver in Excel, click Data at the top of the worksheet, and in that ribbon, click Solver in the Analysis group. The Solver menu will appear as illustrated in Figure 6S-16. If it does not appear there, it must be enabled using the Add-ins menu. Begin by setting the objective (i.e., indicating the cell where you want the optimal value of the objective function to appear). Note, if the activated cell is the cell designated for the value of Z when you click Solver, Solver will automatically set that cell as the Objective. FIGURE 6S-16 MS Excel Solver parameters for microcomputer problem Source: Microsoft Corporation Select the Max radio button if it isn’t already selected. The Changing Variable Cells are the cells where you want the optimal values of the decision variables to appear. Here, they are cells D4 and E4. We indicate this by the range D4:E4 (Solver will add the $ signs). Finally, add the constraints by clicking Add. When that menu appears, for each constraint, enter the cell that contains the formula for the left-hand side of the constraint, then select the appropriate inequality sign, and then enter the right-hand-side amount of the cell that has the right-hand-side amount. Here the right-hand-side amounts are used. After you have entered each constraint, either click Add to add another constraint or click OK to return to the Solver menu. (Note: Constraints can be entered in any order, and if cells are used for the right-hand side, then constraints with the same inequality can be grouped.) For the nonnegativity constraints, simply check the checkbox to Make Unconstrained Variables Non-Negative. Also select Simplex LP as the Solving Method. Click Solve. 3. The Solver Results menu will then appear, indicating a solution has been found, or an error has occurred. If an error occurs, return to the Solver Parameters menu and check to see that your constraints refer to the correct changing cells, and that the inequality directions are correct. Make the corrections and click Solve. Assuming everything is correct, in the Solver Results menu, in the Reports box, highlight both Answer and Sensitivity, and then click OK. 4. Solver will incorporate the optimal values of the decision variables and the objective function in your original layout on your worksheet (see Figure 6S-17). We can see that the optimal values are type 1 = 9 units and type 2 = 4 units, and the total profit is 740. The answer report will also show the optimal values of the decision variables (middle part of the constraints (lower part of Figure 6S-18), and some information on Figure 6S-18). Of particular interest here is information on which constraints have slack and how much slack. Page 6S-18 FIGURE 6S-17 MS Excel worksheet solution for microcomputer problem Source: Microsoft Corporation Page 6S-19 FIGURE 6S-18 MS Excel answer report for microcomputer problem Source: Microsoft Corporation Notice that the constraint entered in cell C7 (assembly) has a slack of 24, and that the constraints entered in cells C8 (inspection) and C9 (storage) have a slack equal to zero, indicating they are binding constraints. 6S.6 SENSITIVITY ANALYSIS LO4 Do sensitivity analysis on the solution to a linear programming problem. Sensitivity analysis is a means of assessing the impact of potential changes to the parameters (the numerical values) of an LP model. Such changes may occur due to forces beyond a manager’s control, or a manager may be contemplating making the changes, say, to increase profits or reduce costs. There are three types of potential changes: Objective function coefficients Right-hand values of constraints Constraint coefficients We will discuss the first two of these here, beginning with changes to objective function coefficients. Objective Function Coefficient Changes A change in the value of an objective function coefficient can cause a change in the optimal solution of a problem. In a graphical solution, this would mean a change to another corner point of the feasible solution space. However, not every change in the value of an objective function coefficient will lead to a changed solution—generally, there is a range of values for which the optimal values of the decision variables will not change. For example, in the microcomputer problem, if the profit on type 1 computers increased from $60 per unit to, say, $65 per unit, the optimal solution would still be to produce nine units of type 1 and four units of type 2 computers. Similarly, if the profit per unit on type 1 computers decreased from $60 to, say, $58, producing nine of type 1 and four of type 2 would still be optimal. These sorts of changes are not uncommon; they may be the result of such things as price changes in raw materials, price discounts, cost reductions in production, and so on. Obviously, when a change does occur in the value of an objective function coefficient, it can be helpful for a manager to know if that change will affect the optimal values of the decision variables. The manager can quickly determine this by referring to that coefficient’s range of optimality, which is the range in possible values of that objective function coefficient over which the optimal values of the decision variables will not change. Before we see how to determine the range, consider the implication of the range. The range of optimality for the type 1 coefficient in the microcomputer problem is 50 to 100. That means that as long as the coefficient’s value is in that range, the optimal values will be nine units of type 1 and four units of type 2. Conversely, if a change extends beyond the range of optimality, the solution will change. Page 6S-20 Similarly, suppose instead that the coefficient (unit profit) of type 2 computers was to change. Its range of optimality is 30 to 60. As long as the change doesn’t take it outside of this range, nine and four will still be the optimal values. Note, however, even for changes that are within the range of optimality, the optimal value of the objective function will change. If the type 1 coefficient increased from $60 to $61, and nine units of type 1 is still optimum, profit would increase by $9: nine units times $1 per unit. Thus, for a change that is within the range of optimality, a revised value of the objective function must be determined. Now let’s see how we can determine the range of optimality using computer output. Using MS Excel There is a table for the Changing Cells (see Figure 6S-19). It shows the value of the objective function that was used in the problem for each type of computer (i.e., 60 and 50), and the allowable increase and allowable decrease for each coefficient. By subtracting the allowable decrease from the original value of the coefficient, and adding the allowable increase to the original value of the coefficient, we obtain the range of optimality for each coefficient. Thus, we find for type 1: 60 − 10 = 50and60 + 40 = 100 Hence, the range for the type 1 coefficient is 50 to 100. For type 2: 50 − 20 = 30and50 + 10 = 60 Hence, the range for the type 2 coefficient is 30 to 60. FIGURE 6S-19 MS Excel sensitivity report for microcomputer problem Source: Microsoft Corporation In this example, both of the decision variables are basic (i.e., nonzero). However, in other problems, one or more decision variables may be nonbasic (i.e., have an optimal value of zero). In such instances, unless the value of that variable’s objective function coefficient increases by more than its reduced cost, it won’t come into solution (i.e., become a basic variable). Hence, the range of optimality (sometimes referred to as the range of insignificance) for a nonbasic variable is from negative infinity to the sum of its current value and its reduced cost. Now let’s see how we can handle multiple changes to objective function coefficients—that is, a Page 6S-21 change in more than one coefficient. To do this, divide each coefficient’s change by the allowable change in the same direction. Thus, if the change is a decrease, divide that amount by the allowable decrease. Treat all resulting fractions as positive. Sum the fractions. If the sum does not exceed 1.00, then multiple changes are within the range of optimality and will not result in any change to the optimal values of the decision variables. Changes in the Right-Hand-Side (RHS) Value of a Constraint In considering right-hand-side (RHS) changes, it is important to know if a particular constraint is binding on a solution. A constraint is binding if substituting the values of the decision variables of that solution into the left-hand side of the constraint results in a value that is equal to the RHS value. In other words, that constraint stops the objective function from achieving a better value (e.g., a greater profit or a lower cost). Each constraint has a corresponding shadow price, which is a marginal value that indicates the amount by which the value of the objective function would change if there were a oneunit change in the RHS value of that constraint. If a constraint is nonbinding, its shadow price is zero, meaning that increasing or decreasing its RHS value by one unit will have no impact on the value of the objective function. Nonbinding constraints have either slack (if the constraint is ≤) or surplus (if the constraint is ≥). Suppose a constraint has 10 units of slack in the optimal solution, which means 10 units that are unused. If we were to increase or decrease the constraint’s RHS value by one unit, the only effect would be to increase or decrease its slack by one unit. But there is no profit associated with slack, so the value of the objective function wouldn’t change. On the other hand, if the change is to the RHS value of a binding constraint, then the optimal value of the objective function would change. Any change in a binding constraint will cause the optimal values of the decision variables to change, and thus cause the value of the objective function to change. For example, in the microcomputer problem, the inspection constraint is a binding constraint: It has a shadow price of 10. That means if there was one hour less of inspection time, total profit would decrease by $10, or if there was one more hour of inspection time available, total profit would increase by $10. In general, multiplying the amount of change in the RHS value of a constraint by the constraint’s shadow price will indicate the change’s impact on the optimal value of the objective function. However, this is only true over a limited range called the range of feasibility. In this range, the value of the shadow price remains constant. Hence, as long as a change in the RHS value of a constraint is within its range of feasibility, the shadow price will remain the same, and one can readily determine the impact on the objective function. Let’s see how to determine the range of feasibility from computer output. Using MS Excel In the sensitivity report, there is a table labeled “Constraints” (see Figure 6S-19). The table shows the shadow price for each constraint, its RHS value, and the allowable increase and allowable decrease. Adding the allowable increase to the RHS value and subtracting the allowable decrease will produce the range of feasibility for that constraint. For example, for the inspection constraint, the range would be 22 − 4 = 18; 22 + 4 = 26 Hence, the range of feasibility for inspection is 18 to 26 hours. Similarly, for the storage constraint, the range is 39 − 6 = 33to39 + 4.5 = 43.5 The range for the assembly constraint is a little different; the assembly constraint is non-binding (note the shadow price of 0) while the other two are binding (note their nonzero shadow prices). The assembly constraint has a slack of 24 (the difference between its RHS value of 100 and its final value of 76). With its slack of 24, its RHS value could be decreased by as much as 24 (to 76) before it would become binding. Conversely, increasing its right-hand side will only produce more slack. Thus, no amount of increase in the RHS value will make it binding, so there is no upper limit on the allowable increase. Excel indicates this by the large value (1E + 30) shown for the allowable increase. So its range of feasibility has a lower limit of 76 and no upper limit. If there are changes to more than one constraint’s RHS value, analyze these in the same way Page 6S-22 as multiple changes to objective function coefficients. That is, if the change is an increase, divide that amount by that constraint’s allowable increase; if the change is a decrease, divide the decrease by the allowable decrease. Treat all resulting fractions as positives. Sum the fractions. As long as the sum does not exceed 1.00, the changes are within the range of feasibility for multiple changes, and the shadow prices won’t change. Tables 6S-1 and 6S-2 summarizes the impacts of changes that fall within either the range of optimality or the range of feasibility. TABLE 6S.1 Summary of the impact of changes within the range of optimality Changes to objective function coefficients that are within the range of optimality Component Result Values of decision variables No change Value of objective function Will change TABLE 6S.2 Summary of the impact of changes within the range of feasibility Changes to RHS values of constraints that are within the range of feasibility Component Result Value of shadow price No change List of basic variables No change Values of basic variables Will change Value of objective function Will change Now let’s consider what happens if a change goes beyond a particular range. In a situation involving the range of optimality, a change in an objective function that is beyond the range of optimality will result in a new solution. Hence, it will be necessary to recompute the solution. For a situation involving the range of feasibility, there are two cases to consider. The first case would be increasing the RHS value of a ≤ constraint to beyond the upper limit of its range of feasibility. This would produce slack equal to the amount by which the upper limit is exceeded. Hence, if the upper limit is 200, and the increase is 220, the result is that the constraint has a slack of 20. Similarly, for a ≥ constraint, going below its lower bound creates a surplus for that constraint. The second case for each of these would be exceeding the opposite limit (the lower bound for a ≤ constraint, or the upper bound for a ≥ constraint). In either instance, a new solution would have to be generated. SUMMARY Optimizing techniques such as linear programming help business organizations make the best use of limited resources, such as materials, time, and energy, to maximize profits or minimize costs. Linear programming is a powerful tool used for constrained optimization situations. Components of LP problems include an objective function, decision variables, constraints, and numerical values (parameters) of the objective function and constraints. The size of real-life problems and the burden of manual solution make computer solutions the practical way to solve real-life problems. Even so, much insight can be gained through the study of simple, two-variable problems and graphical solutions. As with all techniques, it is important to confirm that the underlying assumptions on which the technique is based are reasonably satisfied by the model to achieve valid results. Although the graphical technique has limited use due to the fact that it can only handle two-variable problems, it is useful in conveying many of the important concepts associated with linear programming techniques. KEY TERMS binding constraint constraints decision variables enumeration approach feasible solution space graphical linear programming objective function parameters range of feasibility range of optimality redundant constraint sensitivity analysis shadow price Simplex slack surplus Page 6S-23 SOLVED PROBLEMS Problem 1 A small construction firm specializes in building and selling single-family homes. The firm offers two basic types of houses: model A and model B. Model A houses require 4,000 labour hours, 2 tonnes of stone, and 2,000 board feet of lumber. Model B houses require 10,000 labour hours, 3 tonnes of stone, and 2,000 board feet of lumber. Due to long lead times for ordering supplies and the scarcity of skilled and semiskilled workers in the area, the firm will be forced to rely on its present resources for the upcoming building season. It has 400,000 hours of labour, 150 tonnes of stone, and 200,000 board feet of lumber. What mix of model A and B houses should the firm construct if model A yields a profit of $3,000 per unit and model B yields $6,000 per unit? Assume that the firm will be able to sell all the units it builds. Solution 1. Formulate the objective function and constraints: Maximize Z = 3,000A + 6,000B Subject to Labour Stone Lumber 4,000A+ 2A+ 2,000A+ 10,000B ≤ 400,000labour hours 3B ≤ 150tonnes 2,000B ≤ 200,000board f eet A, B ≥ 0 2. Graph the constraints and objective function, and identify the optimum corner point (see graph). Note that the lumber constraint is redundant: It does not form a boundary of the feasible solution space. 3. Determine the optimal quantities of models A and B, and compute the resulting profit. Because the optimum point is at the intersection of the stone and labour constraints, solve those two equations for their common point: Labour4,000A + 10,000B = 400,000 −2,000 × (Stone2A + 3B = 150) 4,000B = 100,000 B = 25 Substitute B = 25 in one of the equations, and solve for A: 2A + 3(25) = 150 A = 37.5 Z = 3,000(37.5) + 6,000(25) = 262,500 4. We could have used the enumeration approach to find the optimal corner point. The corner points and the value of the objective function at each corner point are: A = 0, B = 40(f ound by inspection);Z = 3,000(0) + 6,000(40) = 240,000 A = 37.5, B = 25(f ound using simultaneous equations);Z = 262,500(see step 3) A = 75, B = 0(f ound by inspection);Z = 3,000(75) + 6,000(0) = 225,000 The best value of Z is 262,500 (because this is a maximization problem), so that indicates that the optimal corner point is A = 37.5, B = 25. Page 6S-24 Problem 2 This LP model was solved by computer: Maximize 15x 1 + 20x 2 + 14x 3 where x 1 = quantity of product 1 x 2 = quantity of product 2 x 3 = quantity of product 3 Subject to: Labour 5x 1 + 6x 2 + 4x 3 ≤ 210hours Material 10x 1 + 8x 2 + 5x 3 ≤ 200pounds Machine 4x 1 + 2x 2 + 5x 3 ≤ 170minutes x1 , x2 , x3 ≥ 0 The following information was obtained from the output. The ranges were also computed based on the output, and they are shown as well. TOTAL PROFIT = 548.00 Variable Value Reduced Cost Range of Optimality Product 1 0 10.6 unlimited to 25.60 Product 2 5 0 9.40 to 22.40 Product 3 32 0 12.50 to 50.00 Constraint Slack Shadow Price Range of Feasibility Labour 52 0.0 158.00 to unlimited Material 0 2.4 170.00 to 270.91 Machine 0 0.4 50.00 to 200.00 a. Which decision variables are basic (i.e., in solution)? Page 6S-25 b. By how much would the profit per unit of product 1 have to increase for it to have a nonzero value (i.e., for it to become a basic variable)? c. If the profit per unit of product 2 increased by $2 to $22, would the optimal production quantities of products 2 and 3 change? Would the optimal value of the objective function change? d. If the available amount of labour decreased by 12 hours, would that cause a change in the optimal values of the decision variables or the optimal value of the objective function? Would anything change? e. If the available amount of material increased by 10 pounds to 210 pounds, how would that affect the optimal value of the objective function? f. If profit per unit on product 2 increased by $1 and profit per unit on product 3 decreased by $.50, would that fall within the range of multiple changes? Would the values of the decision variables change? What would be the revised value of the objective function? Solution a. Products 2 and 3 are in solution (i.e., have nonzero values). The optimal value of product 2 is 5 units, and the optimal value of product 3 is 32 units. b. The amount of increase would have to equal its reduced cost of $10.60. c. No, because the change would be within its range of optimality, which has an upper limit of $22.40. The objective function value would increase by an amount equal to the quantity of product 2 and its increased unit profit. Hence, it would increase by 5($2) = $10 to $558. d. Labour has a slack of 52 hours. Consequently, the only effect would be to decrease the slack to 40 hours. e. The change is within the range of feasibility. The objective function value will increase by the amount of change multiplied by material’s shadow price of $2.40. Hence, the objective function value would increase by 10($2.40) = $24.00. (Note: If the change had been a decrease of 10 pounds, which is also within the range of feasibility, the value of the objective function would have decreased by this amount.) f. To determine if the changes are within the range for multiple changes, we first compute the ratio of the amount of each change to the end of the range in the same direction. For product 2, it is $1/$2.40 = .417; for product 3, it is −$.50/− $1.50 = .333. Next, we compute the sum of these ratios: .417 + .333 = .750. Because this does not exceed 1.00, we conclude that these changes are within the range. This means the optimal values of the decision variables will not change. We can compute the change to the value of the objective function by multiplying each product’s optimal quantity by its changed profit per unit: 5($1) + 32(−$.50) = −$11. Hence, with these changes, the value of the objective function would decrease by $11. Its new value would be $548 − $11 = $537. DISCUSSION AND REVIEW QUESTIONS 1. For which decision environment is linear programming most suited? LO1 2. What is meant by the term feasible solution space? What determines this region? 3. Explain the term redundant constraint. 4. What is an isocost line? An isoprofit line? LO1 LO2 LO2 5. What does sliding an objective function line toward the origin represent? Away from the origin? LO2 6. Briefly explain these terms: a. Basic variable b. Shadow price c. Range of feasibility d. Range of optimality LO1 & LO4 PROBLEMS 1. Solve these problems using graphical linear programming and answer the Page 6S-26 questions that follow. Use simultaneous equations to determine the optimal values of the decision variables. a. Maximize Z = 4x Page 6S-27 LO2 1 + 3x2 Page 6S-28 Subject to Material 6x 1 + 4x 2 ≤ 48lb Labour 4x 1 + 8x 2 ≤ 80hr x1 , x2 ≥ 0 b. Maximize Z = 2x1 + 10x2 Subject to Durability 10x 1 + 4x 2 ≥ 40wk Strength 1x 1 + 6x 2 ≥ 24psi Time 1x 1 + 2x 2 ≤ 14hr x1 , x2 ≥ 0 c. Maximize Z = 6A + 3B (revenue) Subject to Material 20A+ 6B ≤ 600lb Machinery 25A+ 20B ≤ 1,000hr Labour 20A+ 30B ≤ 1,200hr A, B ≥ 0 (1) What are the optimal values of the decision variables and Z? (2) Do any constraints have (nonzero) slack? If yes, which one(s) and how much slack does each have? (3) Do any constraints have (nonzero) surplus? If yes, which one(s) and how much surplus does each have? (4) Are any constraints redundant? If yes, which one(s)? Explain briefly. 2. Solve these problems using graphical linear programming and then answer the questions that follow. Use simultaneous equations to determine the optimal values of the decision variables. LO2 a. Minimize Z = 1.80S + 2.20T Subject to: Potassium 5S + 8T ≥ 200gr Carbohydrate 15S + 6T ≥ 240gr Protein 4S + 12T ≥ 180gr T ≥ 10gr S, T ≥ 0 T b. Minimize Z = 2x 1 + 3x2 Subject to: D 4x 1 + 2x 2 ≥ 20 E 2x 1 + 6x 2 ≥ 18 F 1x 1 + 2x 2 ≤ 12 x1 , x2 ≤ 0 (1) What are the optimal values of the decision variables and Z? (2) Do any constraints have (nonzero) slack? If yes, which one(s) and how much slack does each have? (3) Do any constraints have (nonzero) surplus? If yes, which one(s) and how much surplus does each have? (4) Are any constraints redundant? If yes, which one(s)? Explain briefly. 3. a. An appliance manufacturer produces two models of microwave ovens: H and W. Both models require fabrication and assembly work; each H uses four hours of fabrication and two hours of assembly, and each W uses two hours of fabrication and six hours of assembly. There are 600 fabrication hours available this week and 480 hours of assembly. Each H contributes $40 to profits, and each W contributes $30 to profits. What quantities of H and W will maximize profit? (1) Use the objective function method. (2) Use the enumeration method. LO1 & LO2 b. The company also produces two refrigerator models: large (L) and medium (M). Although materials to produce the refrigerators is available, fabrication time and assembly time are limited. There are 540 hours available for fabrication and 600 hours available for assembly this week. Each unit of model L requires 6 hours for fabrication and 3 hours for assembly, and each unit of M requires 4 hours for fabrication and 5 hours for assembly. Each unit of L contributes $50 to profit, and each unit of model M contributes $40 to profit. How many units of each model should be produced if the objective is to maximize profit? (1) Use the objective function method. (2) Use the enumeration method. LO1 & LO2 4. A small candy shop is preparing for the holiday season. The owner must decide how many bags of deluxe mix and how many bags of standard mix of Peanut/Raisin Delite to put up. The deluxe mix has / pound raisins and / pound peanuts, and the standard mix has / 2 1 3 1 3 2 pound raisins and / pound peanuts per bag. The shop has 90 pounds of raisins and 60 1 2 pounds of peanuts to work with. LO1 & LO2 Peanuts cost $.60 per pound and raisins cost $1.50 per pound. The deluxe mix will sell for $2.90 for a one-pound bag, and the standard mix will sell for $2.55 for a one-pound bag. The owner estimates that no more than 110 bags of one type can be sold. a. If the goal is to maximize profits, how many bags of each type should be prepared? b. What is the expected profit? 5. A retired couple supplement their income by making fruit pies, which they sell to a local grocery store. During the month of September, they produce apple and grape pies. The apple pies are sold for $4.50 to the grocer, and the grape pies are sold for $3.60. The couple is able to sell all of the pies they produce owing to their high quality. They use fresh ingredients. Flour and sugar are purchased once each month. For the month of September, they have 1,200 cups of sugar and 2,100 cups of flour. Each apple pie requires 1 / cups of sugar and 3 cups of flour, and each grape pie requires 2 cups of sugar and 3 1 2 cups of flour. LO1 & LO2 a. Determine the number of grape and the number of apple pies that will maximize revenues if the couple working together can make an apple pie in six minutes and a grape pie in three minutes. They plan to work no more than 60 hours. b. Determine the amounts of sugar, flour, and time that will be unused. 6. Solve each of these problems by computer and obtain the optimal values of the decision variables and the objective function. LO3 a. Maximize Z = 4x1 + 2x2 + 5x3 Subject to: 1x 1 + 2x 2 + 1x 3 ≤ 25 1x 1 + 4x 2 + 2x 3 ≤ 40 3x 1 + 3x 2 + 1x 3 ≤ 30 x1 , x2 , x3 ≥ 0 1x 1 + 1x 2 + 2x 3 ≤ 25 2x 1 + 1x 2 + 4x 3 ≤ 40 1x 1 + 2x 2 + 3x 3 ≤ 40 x1 , x2 , x3 ≥ 0 b. Maximize Z = 10x1 + 6x2 + 3x3 Subject to: 7. For Problem 6a, determine the following: LO4 a. The range of feasibility for each constraint b. The range of optimality for the coefficients of the objective function 8. For Problem 6b: LO4 a. Find the range of feasibility for each constraint, and interpret your answers. b. Determine the range of optimality for each coefficient of the objective function. Interpret your results. 9. A small firm makes three similar products, which all follow the same three-step process, consisting of milling, inspection, and drilling. Product A requires 12 minutes of milling, 5 minutes for inspection, and 10 minutes of drilling per unit; product B requires 10 minutes of milling, 4 minutes for inspection, and 8 minutes of drilling per unit; and product C requires 8 minutes of milling, 4 minutes for inspection, and 16 minutes of drilling. The department has 20 hours available during the next period for milling, 15 hours for inspection, and 24 hours for drilling. Product A contributes $2.40 per unit to profit, product B contributes $2.50 per unit, and product C contributes $3.00 per unit. Determine the optimal mix of products in terms of maximizing contribution to profits for the period. Then, find the range of optimality for the profit coefficient of each variable. LO1 , LO3 & LO4 10. Formulate and then solve a linear programming model of this problem, to determine how many containers of each product to produce tomorrow to maximize profits. The company makes four juice products using orange, grapefruit, and pineapple juice. LO1 & LO3 Product Retail Price per Quart Orange juice $1.00 Grapefruit juice .90 Pineapple juice .80 All-in-One 1.10 The All-in-One juice has equal parts of orange, grapefruit, and pineapple juice. Each product is produced in a one-quart size (there are four quarts in a gallon). On hand are 400 gallons of orange juice, 300 gallons of grapefruit juice, and 200 gallons of pineapple juice. The cost per gallon is $2.00 for orange juice, $1.60 for grapefruit juice, and $1.40 for pineapple juice. In addition, the manager wants grapefruit juice to be used for no more than 30 percent of the number of containers produced. She wants the ratio of the number of containers of orange juice to the number of containers of pineapple juice to be at least 7 to 5. 11. A wood products firm uses available time at the end of each week to make goods for stock. LO1 & LO2 Currently, two products on the list of items are produced for stock: a chopping board and a knife holder. Both items require three operations: cutting, gluing, and finishing. The manager of the firm has collected the following data on these products. TIME PER UNIT (MINUTES) Item Profit/Unit Cutting Gluing Finishing Chopping board $2 1.4 5 12 TIME PER UNIT (MINUTES) Item Profit/Unit Cutting Gluing Finishing Knife holder $6 0.8 13 3 The manager has also determined that, during each week, 56 minutes are available for cutting, 650 minutes are available for gluing, and 360 minutes are available for finishing. a. Determine the optimal quantities of the decision variables if the goal is to maximize profit. b. Which resources are not completely used by your solution? How much of each resource is unused? 12. The manager of the deli section of a grocery superstore has just learned that the department has 112 pounds of mayonnaise, of which 70 pounds is approaching its expiration date and must be used. To use up the mayonnaise, the manager has decided to prepare two items: a ham spread and a deli spread. Each pan of the ham spread will require 1.4 pounds of mayonnaise, and each pan of the deli spread will require 1.0 pound. The manager has received an order for 10 pans of ham spread and 8 pans of the deli spread. In addition, the manager has decided to have at least 10 pans of each spread available for sale. Both spreads will cost $3 per pan to make, but ham spread sells for $5 per pan, and deli spread sells for $7 per pan. LO1 & LO2 a. Determine the solution that will minimize cost. b. Determine the solution that will maximize profit. 13. A manager wants to know how many units of each product to produce on a daily basis to achieve the highest profit. Production requirements for the products are shown in the following table. Product LO1 & LO3 Material 1 (pounds) Material 2 (pounds) Labour (hours) A 2 3 3.2 B 1 5 1.5 C 6 — 2.0 Material 1 costs $5 a pound, material 2 costs $4 a pound, and labour costs $10 an hour. Product A sells for $80 a unit, product B sells for $90 a unit, and product C sells for $70 a unit. Available resources each day are 200 pounds of material 1; 300 pounds of material 2; and 150 hours of labour. The manager must satisfy certain output requirements: The output of product A should not be more than one-third of the total number of units produced; the ratio of units of product A to units of product B should be 3 to 2; and there is a standing order for 5 units of product A each day. Formulate a linear programming model for this problem, and then solve. 14. A chocolate maker has contracted to operate a small candy counter in a fashionable store. To start with, the selection of offerings will be intentionally limited. The counter will offer a regular mix of candy made up of equal parts of cashews, raisins, caramels, and chocolates, and a deluxe mix that is one-half cashews and one-half chocolates, which will be sold in one-pound boxes. In addition, the candy counter will offer individual one-pound boxes of cashews, raisins, caramels, and chocolates. LO1 & LO3 A major attraction of the candy counter is that all candies are made fresh at the counter. However, storage space for supplies and ingredients is limited. Bins are available that can hold the amounts shown in the table. Ingredient Capacity (pounds per day) Cashews 120 Raisins 200 Caramels 100 Chocolates 160 In order to present a good image and to encourage purchases, the counter will make at least 20 boxes of each type of product each day. Any leftover boxes at the end of the day will be removed and given to a nearby nursing home for goodwill. The profit per box for the various items has been determined as follows. Item Profit per Box Regular $.80 Deluxe .90 Cashews .70 Item Profit per Box Raisins .60 Caramels .50 Chocolates .75 a. Formulate the LP model. b. Solve for the optimal values of the decision variables and the maximum profit. 15. Given this linear programming model, solve the model and then answer the questions that follow. LO4 Maximize Z = 12x1 + 18x2 + 15x3 where x1 = the quantity of product 1 to make, etc. Subject to: Machine 5x 1 + 4x 2 + 3x 3 ≤ 160minutes Labour 4x 1 + 10x 2 + 4x 3 ≤ 288hours Materials 2x 1 + 2x 2 + 4x 3 ≤ 200pounds Product 2 x2 ≤ 16units x1 , x2 , x3 ≥ 0 a. Are any constraints binding? If so, which one(s)? b. If the profit on product 3 were changed to $22 a unit, what would the values of the decision variables be? The objective function? Explain. c. If the profit on product 1 were changed to $22 a unit, what would the values of the decision variables be? The objective function? Explain. d. If 10 hours less of labour time were available, what would the values of the decision variables be? The objective function? Explain. e. If the manager decided that as many as 20 units of product 2 could be produced (instead of 16), how much additional profit would be generated? f. If profit per unit on each product increased by $1, would the optimal values of the decision variables change? Explain. What would the optimal value of the objective function be? 16. A garden store prepares various grades of pine bark for mulch: nuggets (x ), mini-nuggets 1 (x2), and chips (x3). The process requires pine bark, machine time, labour time, and storage space. The following model has been developed. LO4 Maximize Z = 9x1 + 9x2 + 6x3 (profit) Subject to: Bark 5x 1 + 6x 2 + 3x 3 ≤ 600pounds Machine 2x 1 + 4x 2 + 5x 3 ≤ 600minutes Labour 2x 1 + 4x 2 + 3x 3 ≤ 480hours Storage 1x 1 + 1x 2 + 1x 3 ≤ 150bags x1 , x2 , x3 ≥ 0 a. What is the marginal value of a pound of pine bark? Over what range is this price value appropriate? b. What is the maximum price the store would be justified in paying for additional pine bark? c. What is the marginal value of labour? Over what range is this value in effect? d. The manager obtained additional machine time through better scheduling. How much additional machine time can be effectively used for this operation? Why? e. If the manager can obtain either additional pine bark or additional storage space, which one should she choose and how much (assuming additional quantities cost the same as usual)? f. If a change in the chip operation increased the profit on chips from $6 per bag to $7 per bag, would the optimal quantities change? Would the value of the objective function change? If so, what would the new value(s) be? g. If profits on chips increased to $7 per bag, and profits on nuggets decreased by $.60, would the optimal quantities change? Would the value of the objective function change? If so, what would the new value(s) be? h. If the amount of pine bark available decreased by 15 pounds, machine time decreased by 27 minutes, and storage capacity increased by five bags, would this fall in the range of feasibility for multiple changes? If so, what would the value of the objective function be? MINI-CASES Page 6S-29 Mini-Case Son, Ltd. Son, Ltd., manufactures a variety of chemical products used by lawn care companies. Son was recently bought out by a conglomerate, and managers of the two organizations have been working together to improve the efficiency of Son’s operations. Managers have been asked to adhere to weekly operating budgets and to develop operating plans using quantitative methods whenever possible. The manager of one department has been given a weekly operating budget of $11,980 for production of three chemical products, which for convenience shall be referred to as Q, R, and W. The budget is intended to pay for direct labour and materials. Processing requirements for the three products, on a per-unit basis, are shown in the table. Product Labour (hours) Material A (pounds) Material B (pounds) Q 5 2 1 R 4 2 — W 2 ½ 2 The company has a contractual obligation for 85 units of product R per week. Material A costs $4 per pound, as does material B. Labour costs $8 an hour. Product Q sells for $122 a unit, product R sells for $115 a unit, and product W sells for $76 a unit. The manager is considering a number of different proposals regarding the quantity of each product to produce. The manager is primarily interested in maximizing contribution. Moreover, the manager wants to know how much labour will be needed, as well as the amount of each material to purchase. Questions Prepare a report that addresses the following issues: 1. The optimal quantities of products and the necessary quantities of labour and materials. 2. One proposal is to make equal amounts of the products. What amount of each will maximize contribution, and what quantities of labour and materials will be needed? How much less will total contribution be if this proposal is adopted? 3. How would you formulate the constraint for material A if it was determined that there is a 5 percent waste factor for material A and equal quantities of each product are required? Page 6S-30 Page 6S-31 Mini-Case Custom Cabinets, Inc. Custom Cabinets, Inc. (CCI) manufactures two major lines of kitchen and bathroom cabinets. The SemiCustom Line consists of cabinets that are variations on a standard design. These cabinets are made to order. The StandardLine is a lower-priced line of cabinets that use standardized designs and materials. StandardLine cabinets are made to stock. The company has been in business for many years and has consistently performed well financially. It was obvious that something big was up as the management staff began to gather for a meeting called by CCI General Manager John Fleming. There was little of the usual light banter, and more significantly, there were no coffee and donuts. The CCI culture celebrates even small achievements with coffee and donuts. Their absence was not a good omen. John began rather somberly. “As you know, we are almost two months into our second fiscal quarter. Frankly, the financial results don’t look very good. You are aware, I’m sure, of how the stock market has been punishing companies that fail to at least meet their sales and profit targets. We are in danger of having to announce that we met our sales goals but fell short of our profit goals. This will be a real jolt to our shareholders, and since, except for the interns, we are all in the company’s stock purchase plan, that means it will hurt us, too. We only have one month to turn this around. We don’t want to take any shortcut approaches to meeting our goals—we want the results to reflect the real results of our operation.” “The headquarters brass talked with a consultant who analyzed our records. Her opinion is that we need to address operations efficiency. In her words, we have to learn to get more out of our existing resources. She leaves the details to us to figure out. Our biggest personnel resource to assign to this problem is our group of management interns from Nearby University. I’ve talked to the interns and alerted them that for the next month or so they are to work directly with Bill Chavez, our Operations Manager, on this project. The goal is to be sure that we get the maximum bang for our resource buck during the next month’s operations. We have to get the most profit possible to make the quarter’s results look at least respectable. Needless to say, I want each of you to give the intern group your fullest cooperation.” “Now you understand why the interns were invited to the staff meeting. You’ve only been on board for a few weeks and have just begun to understand the company’s operations. That means the boss can’t be looking to you for engineering solutions. Your expertise is operations management, not engineering.” As the meeting broke up, Bill Chavez asked you (the interns) to stay for a follow-up meeting with him. “I’ve been very impressed with the work that you have done in your short time with CCI. You obviously get an excellent education at Nearby U. I asked Tom to assign you to me because I think you are our best hope of pulling out some really good profit numbers. You don’t have any preconceived ideas about what will and will not work, so I expect you to come up with ideas that are more innovative than the old hands.” “I spent most of the morning with the other department heads gathering information that I think you might need—that information is enclosed with this case. If you need additional information, send me an email or stop in my office. If I can get the information you need, I will do so. We’re counting on you. Don’t let us down. I’ll let you guys figure out when and where to meet. Needless to say, you have full access to all our computer resources should you need them. “There are a few things you need to keep in mind. Our SemiCustom Line is hot because of our excellent customer service. We never fail to deliver a SemiCustom unit on time. We also need to meet our customer orders on the StandardLine units, but we can cut the stockage levels if necessary. We can’t, however, exceed the stockage levels. Making excess inventory is no way to be more efficient. If necessary, we could work 10 percent overtime in assembly and 5 percent overtime in finishing. Each overtime hour will add $5.00 per hour to our labour cost. I’ve checked with all our suppliers. We can get up to 50,000 additional board-feet of wood by paying a $0.50 per board-foot upcharge and 10,000 additional square feet of laminate for an upcharge of $0.15 per square foot. There is no reasonable prospect of obtaining more of the other materials at any price. Because of the way our profit centre is set up, we get credit for building to the authorized stockage level as if it were a final sale.” As you were leaving the meeting, Barbara Wilson invited you to the break room for a cup of coffee. Barbara is the Lead Production Scheduler and has worked for Custom Cabinets for a long time. You have been told that she knows everything about how things work here and is a good person to know. “I heard about your assignment,” she began. “Let me tell you some things about your boss, Bill Chavez. He is a great guy to work for and he really knows his stuff. He is not one of the college guys who act as if they know everything—no offense. He worked his way up. He is very intelligent, but doesn’t have the educational background that you do. In the past, new college graduates have made some mistakes in writing reports for Bill. He likes for everything in the report to be written in words he can understand. He likes you to include computer printouts in an appendix to the report—he likes to see all the backup detail— but wants you to explain in the body of the report why they are necessary and what they mean. If he doesn’t understand what you are recommending and why, he won’t ask questions. He will just discard the report, and that will be the last assignment you will ever do for him. I figured that the least I could do would be to buy you a cup of coffee and try to help you get off to a good start on this project.” ENCLOSURE A BILLS OF MATERIALS AND LABOUR Solid Wood bd.-ft. Assbly. Finish Trim lin. Granite Surface sq. Laminate Labour Labour ft. sq. ft. ft. sq. ft. hrs. hrs. ENCLOSURE A BILLS OF MATERIALS AND LABOUR Solid Wood bd.-ft. Assbly. Finish Trim lin. Granite Surface sq. Laminate Labour Labour ft. sq. ft. ft. sq. ft. hrs. hrs. SemiCustom Line SC-A 125 27 175 0 0 37 7 SC-B 160 42 243 0 0 57 12 SC-C 140 35 0 160 0 30 5 SC-D 200 52 0 140 0 35 7 StandardLine S-10 60 21 0 112 0 21 3 S-20 110 28 0 0 135 25 5 S-30 200 50 0 0 254 30 7 S-40 180 43 0 0 176 27 5 140,000 45,000 150,000 400,000 100,000 25,000 400,000 ENCLOSURE B ORDERS AND PROFITS Profit/Unit @ Customer Orders Next Standard Month Build-to-Stock Authorization Next Month SemiCustom Line SC- $325 117 0 $575 92 0 $257 130 0 $275 150 0 S-10 $175 475 400 S- $210 363 350 $260 510 450 A SCB SCC SCD StandardLine 20 S-30 ENCLOSURE B ORDERS AND PROFITS S-40 Profit/Unit @ Customer Orders Next Standard Month $230 412 Build-to-Stock Authorization Next Month 475 Source: ©Victor E. Sower, 2006. Questions 1. Should there be additional overtime? If so, how much? 2. Should additional laminate be purchased. If so, how much? 3. Should additional wood be purchased? If so, how much? 4. What is the maximum profit that can be achieved by purchasing additional wood? CHAPTER 7 Work/Job Design Page 261 EXTREME-PHOTOGRAPHER/Getty Images LEARNING OBJECTIVES After completing this chapter, you should be able to: LO1 LO2 LO3 LO4 LO5 LO6 Define work/job design, describe efficiency and behavioural approaches, and discuss the roles of labour unions and information and communication technologies in work/job design. Describe how methods analysis is performed. Discuss the impact of working conditions on work/job design. Describe time-study methods and perform calculations. Describe various compensation methods. Describe aspects of design of work as part of operations strategy. GE Aviation–Bromont, QC, has used participative management involving self-directed teams since its start in 1982. Its employees make more than 400 models of compressor and turbine blades (airfoils) for GE jet engines using over 500 CNCs and over 100 robots.1 There are six production teams and two service teams (maintenance and tooling). The production teams consist of 55–140 members. Technical support staff such as engineers are assigned to a production team. Functions such as HR, finance, and IT support all teams. A production team is further divided into sub-teams (e.g., grinders, inspection). For example, titanium (Titan) team has 11 sub-teams. Each production team elects its leaders for specific roles for a period of time, usually two years. Team leader, management committee, line balance/production planning, quality, new product introduction, environment/health/safety, and preventive maintenance are common roles. Each team makes these and other decisions such as work assignments, schedules, overtime/vacation policies, hiring, process improvement, and purchasing equipment by consensus. There is only one job classification. Each member is expected to become multi-skilled (perform four jobs). There are 120 hours of training per year. Everyone emphasizes the importance of trust, respect, humility, and accountability. Employees are guardians of this culture. There is no union. There are also 14 plantwide standing committees (or councils) such as plant, compensation/gainsharing, hiring, training, and dispute resolution, which have representatives from each production team and support staff such as HR and the plant leader. These committees act both as decision makers and as a source of information, and make recommendations to each team. Information about production, quality, and delivery performance is electronically Page 262 available to everyone, which motivates members of each team to work together to meet their targets. Each team has to be competitive with 70 other plants of GE Aviation and outside suppliers to receive work from GE Aviation. There is peer observation to reduce accidents and improve quality. The Bromont plant is a model of productivity in GE Aviation and is a centre for robotics and automation. 7.1 Approaches to Work/Job Design LO1 Define work/job design, describe efficiency and behavioural approaches, and discuss the roles of labour unions and information and communication technologies in work/job design. Work/job design is the last step in process design. We are assuming that the organizational architecture and its processes are logical, and organizational goals, process sub-goals, resources, and interfaces are effectively managed. We now need to construct roles for employees and others to make the processes work. Work/job design involves determining work/job content and work method, work environment/conditions, time standards, and compensation. Work/job design focuses on what will be done in a job, who will do the job, how the job will be done, and where the job will be done. The objectives of work/job design include productivity, safety, and quality of work life. Work/job design is one of the most fundamental activities in operations management and was the focus of scientific management (later called industrial engineering), pioneered by Frederick Taylor at the beginning of the last century. A set of related tasks makes up the work/job. For example, a UPS parcel delivery driver’s work/job involves many tasks, one of which is the task of carrying a parcel from the truck to a customer’s residence door. Scientific management breaks a task into a sequence of elements (e.g., pick up the parcel) and each element into a sequence of motions (e.g., reach for the parcel). The objective of work/job design is to assign the required organizational tasks to employees so that long-term goals of the organization are achieved. Organization and process improvements will not take root if they are not built into jobs. If jobs are not designed to support process steps, and if job environments are not structured to enable people to make their maximum contributions to process effectiveness and efficiency, then organization and process goals will not be met. Current practice in work/job (re)design is based on two basic approaches. The first is the efficiency a pproach, which emphasizes labour cost reduction in work design; the second is the behavioural app roach, which emphasizes satisfaction of psychological and social wants and needs of workers as a motivator for increased productivity. It is noteworthy that specialization is a primary issue of disagreement between the efficiency and behavioural approaches. Efficiency Approach The efficiency approach includes specialization, methods analysis, time standards, and compensation. We will discuss specialization here, and cover the rest later in the chapter. Specialization describes work/jobs that have a narrow scope. Examples range from assembly-line jobs to medical specialties. For instance, an assembly-line worker could be installing windshields the whole shift (i.e., hundreds of them), repeating the same task every minute. College/university professors often specialize in teaching certain courses, some auto mechanics specialize in transmission repair, and some bakers specialize in wedding cakes. The main rationale for specialization is the ability to concentrate one’s efforts and thereby become proficient at that type of work. Unfortunately, some of these jobs (e.g., assembly-line jobs) can be monotonous and boring. The advantages and disadvantages of a specialized monotonous manual work/job like assembly-line specialization for a company and a worker are summarized in Table 7-1. TABLE 7-1 Advantages and disadvantages of specialized, monotonous manual work (e.g., assembly line operation) Advantages For a company: For a worker: 1. Simplified training 1. Low education and skill 2. High productivity (faster times, less tool change) 3. Relatively low wages requirements 2. Minimal responsibilities 3. Little mental effort Disadvantages For a company: For a worker: 1. Difficult to motivate 1. Monotonous/boring work 2. Worker dissatisfaction, possibly resulting in absenteeism, high 2. Limited opportunities for turnover advancement 3. Little control over work 4. Little opportunity for self-fulfillment The seriousness of the problems with assembly-line specialization resulted in concepts and ideas in the behavioural approach discussed in the next section. Correct positioning of equipment and tools can help reduce fatigue and increase employee productivity. Behavioural Approach People work for a variety of reasons (beyond monetary compensation). These include socialization, self-actualization (fulfillment of one’s talents and potential), status, and a sense of purpose and accomplishment. Awareness of these factors can help management develop a motivational framework that encourages workers to respond in a positive manner to the goals of the organization. An important factor is trust. In an ideal work environment, there is a high level of trust Page 263 between workers and managers. When managers trust employees, there is a greater tendency to give employees added responsibilities. When employees trust management, they are more likely to respond positively to changes and be loyal to the organization. Conversely, when they do not trust management, they are more likely to respond in less desirable ways. New management approaches such as total quality management (TQM) are based on employee involvement in decision making (deciding how work is done and how its quality can be improved). This is also called employee empowerment or high performance work system. The behavioural approach attempts to make jobs more interesting, rewarding, and meaningful by applying job enlargement, job rotation, job enrichment, and self-directed teams. Job enlargement means giving a worker a larger portion of the total activity of making a good or providing a service. This is referred to as horizontal loading, where additional tasks are on the same level of skill and responsibility as the original job. The goal is to make the work/job more interesting by increasing the variety of skills required and by letting the worker make a more recognizable contribution to the overall output. For example, an assembly-line worker’s work/job might be expanded so that the person is responsible for a sequence of tasks instead of just one. Page 264 Job rotation means having workers in the same work area periodically exchange jobs. A company can use this approach to avoid having an employee stuck in a monotonous or repetitive job. Job rotation allows workers to broaden their learning experience and enables them to fill in for others in the event of illness or absenteeism. Also, repetitive motion injuries may be avoided by periodically doing a different type of physical work. Job enrichment involves an increase in the level of employee responsibility for planning, execution, and control of the job. It is sometimes referred to as vertical loading. An example of job enrichment is when an assembly line operator’s responsibility is expanded to include minor maintenance, completing time sheets, planning rotation/overtime/vacation/shutdown, writing operations and training manuals, training, and participating in reliability groups. Job enlargement and job enrichment are also used in lean operations (covered in Chapter 14), where workers are cross-trained to be able to perform a wider variety of tasks and given more authority to manage their jobs. A self-directed team, sometimes referred to as a self-managed or autonomous team, is a group of employees who perform the same function or produce a family of products, and are empowered to make decisions involving their own work (e.g., membership, work assignment, pace of work, training, and quality). This is different from other forms of work teams such as quality circles (discussed in Chapter 9), which have little decision making authority and are not permanent. The underlying concept for self-directed teams is that the workers, who are closest to their work and have the best knowledge of it, are better suited than management to make the most effective changes to improve the process. Moreover, they are more engaged and motivated, and will work harder to achieve better results. The structure of organizations using self-directed teams is flat rather than top-down with many levels. Furthermore, the organization requires a different culture, and team members must be trained in new chapter opener to this chapter skills, including communication, problem solving, and leadership. The is an example of a plant made up of self-directed teams. Self-directed teams have a number of benefits. One is that fewer managers are necessary—often one manager can handle several teams. Also, selfdirected teams can provide improved responsiveness to problems, they have a personal stake in making the process work, and they require less time to implement improvements. At the Michigan International Speedway pit stop, the Toyota team changes four tires, fills the gas tank, and does a maintenance check in under 15 seconds. This is done four to six times during a 400-mile NASCAR race. John Harrelson/Getty Images for NASCAR Generally, the benefits of teams include higher quality, higher productivity, and greater worker satisfaction. Moreover, higher levels of employee satisfaction can lead to less turnover and absenteeism, resulting in lower costs to train new workers and less need to fill in for absent employees. This does not mean that organizations will have no difficulties in applying the team concept. Managers, particularly middle managers, often feel threatened as teams assume more of the traditional functions of managers. Moreover, among the leading problems of teams are conflicts between team members, which can have a detrimental impact on the effectiveness of a team. Role of Unions Labour unions can affect all aspects of work/job design and how work is accomplished. In many organizations, labour unions represent employees in negotiating and executing labour contracts (collective agreements). A collective agreement determines the wages, benefits (extended health care, vacation, pension, etc.), security of jobs/limits to outsourcing and hiring temporary workers, hiring/layoff/promotion/seniority, safety standards/working conditions, work rules, job classification, scheduling, and grievance procedures. Unionized workplaces generally have higher wages and benefits than comparable non-union Page 265 organizations. This is the main reason why companies such as Walmart and McDonald’s have opposed unions in their facilities. Another reason for opposition to unions is that they promote rigid work rules and excessive job classification. In Canada, once the majority of workers vote to have a union, all workers in that workplace will have to pay union dues. Forming a union is regulated by the Canada Labour Code and its provincial counterparts (e.g., the Labour Relations Act of Ontario). Provincial labour boards oversee the process of collective agreement and dispute resolution.2 While a minority of management–labour relationships are antagonistic, most are cooperative. An example is the 2020 agreement between Air Canada and Unifor (Unifor 2002), a union that represents 5,600 Air Canada employees working as customer sales and service agents and customer relations representatives.3 This agreement provided improvements to wages and benefits, improved job security provisions, and an enhanced flexible time bank. Most collective agreements are between a company and the union(s) representing its employees. But some are between an association of companies and a trade union in a province, as, for example, with the Mechanical Contractors Association of New Brunswick Inc. (representing contractor firms in New Brunswick) and the United Association of Journeymen and Apprentices of the Plumbing and Pipe Fitting Industry of the United States, Canada.4 Many smaller unions are local to a particular workplace, but large ones are usually part of a national or international union. Examples include the Canadian Union of Public Employees, the National Union of Public and General Employees, and Unifor;5United Food and Commercial Workers Canada; United Steelworkers, which also represents some mining, forestry, and rubber company workers; Teamsters Canada, which represents truck drivers and also rail company workers; International Association of Machinists & Aerospace Workers; Construction & Specialty Workers Union; Bakery, Confectionery, Tobacco Workers and Grain Millers Union; and the International Union of Operating Engineers.6 Role of Information and Communication Technologies Information and communication technologies (ICTs) include computers, the Internet, wireless networks, smartphones, and the software and applications that use those technologies. ICTs have had a significant effect on all aspects of work/job design and how work is accomplished. ICTs are inherently more flexible than older industrial technologies. The utility of a machine tool is limited, whereas, for example, a smartphone has the ability to make phone calls; send text messages and email; browse the Internet; and take photographs and record videos. In the current information age, ICTs have changed the nature of work in many industries. There is less demand for newspapers, but more demand for 24-hour Internet and TV news channels. Office work has become paperless. Employees write and store their own documents. Wi-Fi networks are commonplace. Business administration has become paperless. For example, instead of accounting clerks, business software keeps track of financial records. Payroll departments deposit employees’ compensation electronically into their bank accounts. People are using ATMs, online banking, and, more recently, mobile apps instead of interacting with a human teller in a bank branch. Customer service is performed by call centres, many of which are overseas. Many online services are provided 24/7, so some employees have to work irregular hours. Others prefer to work flexible hours. As a result, leisure time and work–life balance is blurred. There are fewer letters but more emails, and there are more packages to deliver. Computer literacy is a must. ICT training has become a booming industry. The “always on” character of these digital technologies provides employees with new opportunities for flexible coordination. ICTs are redefining the boundaries between work and home. Much work can now be done online and from anywhere. Business can be done while shopping, sitting at a coffee shop, or even standing in line. One task can now be done by teams that are dispersed geographically. Online contracting services such as Upwork have millions of jobs posted. Information technology (IT) jobs—such as web design, software development, and data entry—make up the majority of the jobs. However, jobs in other areas—such as graphic design; animation; music, blog, and article writing; and even legal services—are also growing. Microwork, disaggregating a large task into small pieces that are farmed out to a large number Page 266 of workers, has generated significant opportunities for many workers worldwide. Examples of microwork include market research, data input, sentiment analysis, data verification, copywriting, graphic design, translation, and even software testing. 7.2 Methods Analysis LO2 Describe how methods analysis is performed. Methods analysis focuses on how a job is done and breaks each job into a sequence of tasks/elements/motions and tries to make it more efficient. Job design often begins with an analysis of the overall operation. It then moves from general to specific details of the job, concentrating on arrangement of the workplace and movements of materials or workers. The need for methods analysis can come from a number of different sources: changes in tools and equipment, changes in product design or introduction of new products, changes in materials or procedures, government regulations or contractual agreements, and incidents such as accidents and quality problems. Methods analysis is done for both existing jobs and new jobs. For a new job, it is needed to establish a method. For an existing job, the procedure usually is to have the analyst observe the job as it is currently being performed and then devise improvements. For a new job, the analyst must rely on a job description and an ability to visualize the operation. The basic procedure in methods analysis is: 1. Identify the job to be studied. A candidate job for study has high labour content, is done frequently, is unsafe/tiring/unpleasant/noisy, causes quality problems, and/or is a bottleneck. 2. Gather all pertinent facts about the worker (age, gender, size, experience, motivation, satisfaction, education, fitness), parts (sketch/drawing, size, shape, weight, material, tolerances), tasks (how parts flow in/out, what happens, motions, fixtures, machines/equipment, tools, layout, awkward motions, lifting, fatigue, sensory input, cycle time, standard time), workplace (location, layout, light, glare, noise, heat, vibration, protective equipment), and administrative factors (wage incentive, job rotation/team, enlargement, enrichment, training, policy). 3. Document and analyze the present method, and discuss the job/facts with the worker and supervisor. 4. Question the present method and propose a new method. Analyzing and questioning the method and proposing a new method (sometimes called work simplification) requires careful thought about the what, why, when, where, and who of the job. Questions to ask include: Can a task/element/motion be eliminated? Combined with another? Can the sequence of tasks/elements/motions be changed? Are close tolerances necessary? Can cheaper material be substituted? Can material handling equipment be improved? Can distance moved be reduced? Can setup time be reduced? Can fixtures and tools be improved? Can any delay, storage, or inspection be eliminated? Can the part be redesigned for easy manufacturing/assembly? Are working conditions satisfactory? Is the work area arranged well? Can worker motions be improved or made more ergonomic? Does the worker have the right skill level? Can technology assist in the method improvement? Documenting, analyzing, and improving methods is facilitated by the use of various charts, such as a flow process chart and a worker–machine process chart. A flow process chart is used to collect and review the sequence of steps performed in a process. Each step is categorized as one of operation, movement, inspection, delay, and storage. Delay means waiting to be processed (a few hours), whereas storage is a much longer wait (a few days). A flow process chart is helpful in identifying the nonproductive steps of the process (e.g., delays, distances travelled). Figure 7-1 describes the symbols used in constructing a flow process chart, and Page 267 Figure 7-2 illustrates a flow process chart for “Requisition of petty cash” in a company. The petty cash is used for minor expenses such as buying a hand tool. For this example, after considering the amount of work involved in petty cash requisition, a solution may be to issue a corporate credit card (with a limit) to the department heads. FIGURE 7-1 Process chart symbols Source: Adapted from Benjamin W. Niebel, Motion and Time Study, 8th ed. Copyright © 1988 Richard D. Irwin, Inc. Used by permission of McGraw-Hill Education, Inc., p. 35. Page 268 FIGURE 7-2 Example of a flow process chart Source: Elias M. Awad, System Analysis and Design, 4th ed. (Burr Ridge, IL: Richard D. Irwin), p. 113. © by Richard D. Irwin, Inc. Reprinted by permission of the McGraw-Hill Companies Inc. The uses for flow process charts include studying the flow of material through a department, studying the sequence that documents or forms take, analyzing the movement and care of surgical patients, studying the layout of department and grocery stores, and handling mail. A worker–machine chart is a chart used to describe or plan the interactions between a worker and their machine(s) over time. This chart is helpful in visualizing the portions of a work cycle during which an operator and equipment are busy or idle. The analyst can easily see when the worker and machine are working independently and when their work overlaps. One use of this type of chart is to determine how many machines the operator can manage. Figure 7-3 presents an example of a worker–machine chart, where the “worker” is actually a customer weighing a purchase in the bulk food section of a supermarket. Among other things, the chart highlights worker and machine utilization. FIGURE 7-3 Example of a worker–machine process chart Motion Study Motion study is the systematic study of the human motions used to perform a task/element. The purpose of motion study is to eliminate unnecessary motions and to identify the best motions for maximum efficiency. Hence, motion study can be an important tool for methods analysis and productivity improvement. Present practice evolved from the work of Frank Gilbreth, who originated the concept in the bricklaying trade in the early 20th century. Motion study was used by Gilbreth to increase the number of bricks laid per hour by workers by a factor of three. There are a number of different techniques that motion study analysts use to develop efficient procedures. The most-used techniques are the following: Motion study principles Analysis of therbligs Micromotion study Charts Page 269 Gilbreth’s work laid the foundation for the development of motion study principles, which are guidelines for designing motion-efficient work procedures. The guidelines are divided into three categories: principles for use of the body, principles for arrangement of the workplace, and principles for the design of tools and equipment. Figure 7-4 lists some examples of the principles. FIGURE 7-4 Examples of motion study principles A. Use of arms and body: 1. Both hands should begin and end their motion simultaneously and should not be idle at the same instant, except during frequent but short rest periods. 2. The motions made by the hands should be minimal and symmetrical. 3. Momentum should assist workers wherever possible, but should be minimized if it must be overcome by muscular effort. 4. Continuous natural curved motions are preferable to straight-line motions involving sudden and sharp changes in direction. 5. Strength requirements should be much less than the maximum available. Avoid lifting heavy objects. Use slow movements for maximum muscle strength. 6. Eliminate bend and rise as well as awkward positions, and make the tasks easier to reduce fatigue. 7. Eliminate eye travel and avoid losing eye focus. B. Arrangement of the workplace: 1. Fixed locations for all tools and material should be provided to permit the best sequence and to eliminate or reduce search and selection. 2. Gravity bins and drop delivery should reduce reach and move times; wherever possible ejectors should remove finished parts automatically. 3. All materials and tools should be located within easy reach. 4. Provide a chair or stool if possible. C. Design of tools and equipment: 1. Where possible, power tools should replace hand tools. 2. All levers, handles, wheels, and other control devices should be readily accessible to the operator and designed to give the best possible mechanical advantage and to utilize the strongest available muscle group. 3. Parts should be held in position by fixtures. Source: Adapted from Benjamin W. Niebel, Motion and Time Study, 8th Ed (Burr Ridge, IL: Richard D. Irwin, Inc.), pp. 206–207. Reprinted with permission of the McGraw-Hill Companies Inc. In developing work methods that are motion efficient, the analyst tries to: Eliminate unnecessary motions Combine activities Reduce fatigue Improve the arrangement of the workplace Improve the design of tools and equipment Therbligs are basic elemental motions. The term therblig is Gilbreth spelled backward (except for the th). The approach is to break jobs down into basic elements and base improvements on an analysis of these basic elements by eliminating, combining, or rearranging them. Although a complete description of therbligs is outside the scope of this text, a list of some common ones will illustrate the nature of these basic elemental motions: Search implies hunting for an item with the hands and/or the eyes. Select means to choose from a group of objects. Grasp means to take hold of an object. Hold refers to retention of an object after it has been grasped. Transport load means movement of an object after hold. Release load means to deposit the object. Some other therbligs are inspect, position, plan, rest, and delay. Page 270 Describing a job using therbligs often takes a substantial amount of work. However, for short, repetitive jobs therbligs analysis may be justified. Frank Gilbreth and his wife, Lillian, an industrial psychologist, were also responsible for introducing motion pictures for studying motions, called micromotion study. This approach is applied not only in industry but also in some other areas such as sports. Use of cameras and slow-motion replay enables analysts to study motions that would otherwise be too rapid to see. In addition, the resulting films provide a permanent record that can be referred to, not only for training workers and analysts, but also for settling disputes involving standard times. Motion-study analysts may use a two-hand process chart or simo chart to study simultaneous motions of the hands. These charts are invaluable in studying operations such as data entry, sewing, surgical and dental procedures, and certain assembly operations. Figure 7-5 shows a simo chart describing detailed hand movements for an operator performing an assembly-type task. FIGURE 7-5 A simo or two-hand process chart Source: Benjamin W. Niebel, Motion and Time Study, 8th ed. Copyright © 1988 Richard D. Irwin, Inc. Used by permission of McGraw-Hill Companies, Inc. p. 229. 7.3 Working Conditions LO3 Discuss the impact of working conditions on work/job design. Working conditions such as temperature and humidity, ventilation, illumination, noise and vibration, work hours, work breaks, safety, ergonomics, and a healthy workplace, including mental well-being, can have a significant impact on worker performance in terms of productivity and product quality. Governments have played an important role in the regulation of the work environment. Page 271 Government Regulation of the Workplace The creation of factories in the nineteenth century was the start of increasing workplace health and safety problems. To address these problems, the government passed worker protection acts that required guards on the machines, fire safety, boiler and elevator inspection, sanitation, ventilation, and adequate heating and lighting. The Canada Labour Code of 1966 included safety as well as other employment/work standards such as a minimum wage and a 40-hour workweek. In 1978, the Labour Code was amended to give three rights to workers: (1) to refuse dangerous work, (2) to participate in improving safety and health problems (through joint management/labour committees), and (3) to know about hazards in the workplace. In 1988, (3) was shaped into the requirement for a Workplace Hazardous Materials Information System (WHMIS), which mandates proper labelling of hazardous materials and making the material safety data sheets available. The Canada Labour Code7 contains acts for (1) industrial relations (unions), (2) occupational health and safety, and (3) standard hours, wages, vacations, and holidays. Canada Labour Code applies to federally regulated organizations, those whose activities cross provincial boundaries. Each province has its own version of labour and employment standards for provincially regulated organizations (e.g., the Employment Standards Act in Ontario8). Page 272 Temperature and Humidity Although human beings can function under a fairly wide range of temperatures, work performance tends to be adversely affected if air temperatures are outside a very narrow comfort band. That comfort band depends on humidity, wind speed, and how strenuous the work is. For example, for office work (no wind) in winter (warm clothing) and relative humidity of 60 percent, the comfort band is 20°C to 24°C.9 Solutions range from selection of suitable clothing to space heating or cooling devices. Ventilation Unpleasant and noxious odors can be distracting and dangerous to workers. Moreover, unless smoke and dust are periodically removed, the air can quickly become stale and annoying. Illumination The amount of illumination required depends largely on the type of work being performed; the more detailed the work, the higher the level of illumination needed for adequate performance. Other important considerations are the amount of glare and contrast. From a safety standpoint, good lighting in halls, stairways, and other dangerous points is important. However, because illumination is expensive, high illumination in all areas is not generally desirable. Noise and Vibrations Noise is caused by the movement and vibrations of machines and equipment. Noise can be annoying or distracting, leading to errors and accidents. It can also damage or impair hearing if it is loud enough. Figure 7-6 illustrates the loudness level of some typical sounds. FIGURE 7-6 Decibel values of typical sounds Source: From Benjamin W. Niebel, Motion and Time Study, 8th ed. Copyright © 1988 Richard D. Irwin, Inc. Used by permission of McGraw-Hill Companies, Inc., p. 248. Vibrations can be a factor in work/job design even without a noise component. Vibrations can come from tools, machines, vehicles, air conditioning systems, pumps, and other sources. Corrective measures include padding, stabilizers, shock absorbers, cushioning, and rubber mountings. Work Hours Reasonable (and sometimes flexible) work hours can provide a sense of freedom and control over one’s work. This is useful in situations where the emphasis is on completing work on a timely basis and meeting performance objectives rather than being “on duty” for a given time interval, as is the case for most retail and manufacturing operations. The most common flexible work hours are (1) flexi-time schemes (e.g., working from 10 a.m. to Page 273 6 p.m. rather than from 9 a.m. to 5 p.m.), (2) compressed workweek (e.g., four 10-hour days or a nine-day fortnight), (3) telework, (4) banking of hours, (5) gradual retirement, and (6) job sharing (where two employees take joint responsibility for one full-time job, sometimes splitting the full-time job into two part-time jobs.10 Job sharing should not be confused with work sharing (WS), which is the practice of reducing work hours for an employee usually to avoid layoffs. The Government of Canada has a work-sharing program, which is a three-party agreement involving employers, employees, and Service Canada. Employees on a work-sharing agreement must agree to a reduced schedule of work and share the available work equally over the term of the agreement.11 Work Breaks The frequency, length, and timing of work breaks (i.e., rests) can have a significant impact on both productivity and product/service quality. Breaks and vacations can result in an upward shift in efficiency. Safety Worker safety is one of the most important issues in work/job design and needs constant attention from management and employees or the union. Workers cannot be motivated if they feel they are in physical danger. From an employer standpoint, accidents are undesirable because they are expensive (workers’ compensation insurance premiums will increase, and the company may also get fined) and bring bad publicity. Two basic causes of accidents are worker carelessness and unsafe working conditions. Carelessness includes unsafe acts such as failing to use protective equipment, overriding safety controls (e.g., taping control buttons down), disregarding safety procedures, using tools (e.g., saws) and equipment (e.g., rollers, conveyors) improperly, and failing to use reasonable caution in danger zones (e.g., walking in front of or behind a forklift, touching hot parts or equipment). Unsafe working conditions include having unprotected pulleys, chains, material-handling equipment, and machinery; working at heights without a tether; storing items at heights from which they could fall, and so on. Also, poorly lit or slippery walkways, stairs, and loading docks constitute hazards. So do toxic wastes, gases and vapours, and radiation. Having faulty or inadequate equipment (e.g., using a two-person suspended platform for five window cleaners) is also an unsafe working condition. Protection against hazards involves the use of proper equipment and lighting, clearly marked danger zones, protective equipment (hardhats, welding masks, goggles, earmuffs, gloves, steel-toed footwear, and clothing), safety devices (machine guards, dual-control switches that require an operator to use both hands), emergency equipment (emergency showers, fire extinguishers, fire escapes), and thorough instruction and training in safety procedures. Housekeeping (clean floors, open aisles, waste removal) is another important safety factor. Management must enforce safety procedures and the use of safety equipment. Occupational health and safety regulations require the use of inspectors to ensure that the regulations are adhered to. Inspections are carried out both at random and to investigate complaints of unsafe conditions. The inspectors are empowered to issue warnings, to impose fines, and even to order shutdown of a facility because of unsafe conditions. A more effective way to deal with management of safety issues is to incorporate it into the company’s management planning and control activities, just as quality is managed. A safety management system based on the guidelines of the ISO 45001 can be used. This is similar to ISO 9001 (for quality systems) and ISO 14001 (for environmental systems). ISO 45001 specifies requirements for an occupational health and safety (OH&S) management system and helps organizations create a safe workplace and improve their occupational health and safety
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )