AN INSTRUCTOR’S SOLUTIONS MANUAL TO ACCOMPANY POWER SYSTEM ANALYSIS AND DESIGN SEVENTH EDITION J. DUNCAN GLOVER THOMAS J. OVERBYE MULUKUTLA S. SARMA Adam B. Birchfield Contents Chapter 2............................................................................................................................. 1 Chapter 3........................................................................................................................... 24 Chapter 4........................................................................................................................... 63 Chapter 5........................................................................................................................... 85 Chapter 6......................................................................................................................... 125 Chapter 7......................................................................................................................... 160 Chapter 8......................................................................................................................... 166 Chapter 9.........................................................................................................................185 Chapter 10....................................................................................................................... 219 Chapter 11....................................................................................................................... 293 Chapter 12....................................................................................................................... 314 Chapter 13....................................................................................................................... 333 Chapter 14....................................................................................................................... 346 Chapter 15....................................................................................................................... 369 Chapter 2 Fundamentals 2.1 (a) ๐ด1ฬ = 9∠30° = 9[๐๐๐ 30° + ๐ ๐ ๐๐ 30°] = 7.8 + ๐4.5 5 (b) ๐ดฬ2 = 4 + ๐5 = √16 + 25 ∠ ๐ก๐๐−1 4 = 6.40∠128.66° = 6.40๐ ๐128.66° (c) ๐ดฬ 3 = (7.8 + ๐4.5) + (−4 + ๐5) = (11.8 + ๐9.5) = 15.15∠38.8° (d) ฬ ฬ ฬ ๐ด4 = (9∠30°)(6.4∠51.34°) = 57.6∠81.34° = 8.673 + ๐56.9 (e) ฬ ฬ ฬ ๐ด5 = 2.2 9∠30° = 1.41∠81.34° = 1.41๐ ๐81.34° 6.4∠−52.34° (a) ๐ผฬ = 500∠ − 30° = 433.01 − ๐250 (b) ๐(๐ก) = 4๐ ๐๐(๐๐ก + 15°) = 4๐๐๐ (๐๐ก + 15° − 90°) = 4co s(๐๐ก − 75°) ๐ผฬ = 4 ∠ − 75° = 2.83∠ − 75° = 0.73 − ๐2.73 √2 (c) ๐ผฬ = (5/√2)∠ − 15° + 4∠ − 60° = (3.42 − ๐0.92) + (2 − ๐3.46) = 5.42 − ๐4.38 = 6.964∠ − 38.94° 2.3 13 ๐ฬ 2 = 2 ∠(−(125 × 10−6 )(2๐60)) kV = 9.19∠ − 2.7° kV 2.4 (a) I1 = 10๏0๏ฐ √ − j6 6๏ − 90๏ฐ = 10 = 7.5๏ − 90๏ฐ A 8 + j6 − j6 8 I 2 = I − I1 = 10๏0๏ฐ − 7.3๏ − 90๏ฐ = 10 + j 7.5 = 12.5๏36.87๏ฐ A V = I 2 ( − j 6 ) = (12.5๏36.87๏ฐ ) ( 6๏ − 90๏ฐ ) = 75๏ − 53.13๏ฐ V (b) 1 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 2.5 (a) ๏ต (t ) = 277 2 cos (๏ท t + 30๏ฐ) = 391.7cos (๏ท t + 30๏ฐ ) V ฬ ๐ (b) ๐ผ ฬ = 45 = 6.155∠30° A ๐(๐ก) = 8.7 cos (๐๐ก + 30°) A (c) Z = j๏ท L = j ( 2๏ฐ 60 ) (10 ๏ด 10 −3 ) = 3.771๏90๏ฐ ๏ I = V Z = ( 277 ๏30๏ฐ ) ( 3.771๏90๏ฐ ) = 73.46 ๏ − 60๏ฐ A i(t ) = 73.46 2 cos (๏ทt − 60๏ฐ ) =103.9cos (๏ทt − 60๏ฐ ) A (d) Z = − j 25 ๏ I = V Z = ( 277๏30๏ฐ ) ( 25๏ − 90๏ฐ ) = 11.08๏120๏ฐ A i(t ) = 11.08 2 cos (๏ท t + 120๏ฐ ) = 15.67cos (๏ท t + 120๏ฐ ) A 2.6 75 (a) ๐ฬ = ( 2) ∠ − 15° = 53.03∠ − 15°; ๏ท does not appear in the answer. √ (b) ๐(๐ก) = 50√2 ๐๐๐ (๐๐ก + 10°); with ๏ท = 377, ๐(๐ก) = 70.71 ๐๐๐ (377๐ก + 10°) (c) ๐ดฬ = ๐ด∠๐ผ; ๐ตฬ = ๐ต∠๐ฝ; ๐ถฬ = ๐ดฬ + ๐ตฬ c(t ) = a(t ) + b(t ) = 2 Re ๏ฉ๏ซCe j๏ทt ๏น๏ป The resultant has the same frequency ๏ท. 2.7 (a) The circuit diagram is shown below: (b) ๐ฬ ฬถ = 3 + ๐8 − ๐4 = 3 + ๐4 = 5∠53.1° ๐บ (c) I = (100๏0๏ฐ ) ( 5๏53.1๏ฐ ) = 20๏ − 53.1๏ฐ A The current lags the source voltage by 53.1๏ฐ Power Factor = cos53.1๏ฐ = 0.6 Lagging 2 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 2.8 Z LT = j ( 377 ) ( 30.6 ๏ด 10 −6 ) = j11.536 m ๏ Z LL = j ( 377 ) ( 5 ๏ด 10 −3 ) = j1.885 ๏ ZC = − j V= 1 = − j 2.88 ๏ ( 377 ) ( 921 ๏ด 10−6 ) 120 2 2 ๏ − 30๏ฐ V The circuit transformed to phasor domain is shown below: 2.9 KVL : 120๏0๏ฐ = ( 60๏0๏ฐ )( 0.1 + j 0.5 ) + VLOAD ๏ VLOAD = 120๏0๏ฐ − ( 60๏0๏ฐ )( 0.1 + j 0.5 ) = 114.1 − j 30.0 = 117.9๏ − 14.7๏ฐ V ๏ฌ 2.10 (a) p(t ) = ๏ต (t )i (t ) = ๏ซ๏ฉ 400cos (๏ท t + 30๏ฐ ) ๏น๏ป ๏ฉ๏ซ100cos (๏ท t − 80๏ฐ )๏น๏ป 1 ( 400 )(100 ) ๏ฉ๏ซcos110๏ฐ + cos ( 2๏ท t − 50๏ฐ )๏น๏ป 2 = −6840.4 + 2 ๏ด 104 cos ( 2๏ท t − 50๏ฐ ) W = (b) P = VI cos (๏ค − ๏ข ) = ( 282.84 )( 70.71) cos ( 30๏ฐ + 80๏ฐ ) = −6840 W Absorbed = +6840 W Delivered (c) Q = VI sin (๏ค − ๏ข ) = ( 282.84 )( 70.71) sin110๏ฐ = 18.79 kVAR Absorbed (d) The phasor current (−๐ผฬ) = 70.71∠ − 80° + 180° = 70.71 ∠100° A leaves the positive terminal of the generator. The generator power factor is then ๐๐๐ (30° − 100°) = 0.3420 leading 2.11 (a) p(t ) = ๏ต (t )i(t ) = 391.7 ๏ด 19.58cos 2 (๏ท t + 30๏ฐ ) ๏ฆ1๏ถ = 0.7669 ๏ด 10 4 ๏ง ๏ท ๏ฉ๏ซ1 + cos ( 2๏ท t + 60๏ฐ ) ๏น๏ป ๏จ2๏ธ = 3.834 ๏ด 103 + 3.834 ๏ด 10 3 cos ( 2๏ท t + 60๏ฐ ) W P = VI cos (๏ค − ๏ข ) = 277 ๏ด 13.85cos0๏ฐ = 3.836 kW Q = VI sin (๏ค − ๏ข ) = 0 VAR Source Power Factor = cos (๏ค − ๏ข ) = cos ( 30๏ฐ − 30๏ฐ ) = 1.0 3 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (b) p(t ) = ๏ต (t )i(t ) = 391.7 ๏ด 103.9cos (๏ท t + 30๏ฐ ) cos (๏ท t − 60๏ฐ ) ๏ฆ1๏ถ = 4.07 ๏ด 10 4 ๏ง ๏ท ๏ฉ๏ซcos90๏ฐ + cos ( 2๏ท t − 30๏ฐ ) ๏น๏ป ๏จ2๏ธ = 2.035 ๏ด 10 4 cos ( 2๏ท t − 30๏ฐ ) W P = VI cos (๏ค − ๏ข ) = 277 ๏ด 73.46 cos ( 30๏ฐ + 60๏ฐ ) = 0 W Q = VI sin (๏ค − ๏ข ) = 277 ๏ด 73.46sin 90๏ฐ = 20.35 kVAR pf = cos (๏ค − ๏ข ) = 0 Lagging (c) p(t ) = ๏ต (t )i(t ) = 391.7 ๏ด 15.67cos (๏ท t + 30๏ฐ ) cos (๏ท t + 120๏ฐ ) ๏ฆ1๏ถ = 6.138 ๏ด 103 ๏ง ๏ท ๏ฉ๏ซcos ( −90๏ฐ ) + cos ( 2๏ท t + 150๏ฐ ) ๏น๏ป = 3.069 ๏ด 10 3 cos ( 2๏ท t + 150๏ฐ ) W ๏จ2๏ธ P = VI cos (๏ค − ๏ข ) = 277 ๏ด 11.08cos ( 30๏ฐ − 120๏ฐ ) = 0 W Q = VI sin (๏ค − ๏ข ) = 277 ๏ด 11.08sin ( −90๏ฐ ) = −3.069 kVAR Absorbed = +3.069 kVAR Delivered pf = cos (๏ค − ๏ข ) = cos ( −90๏ฐ ) = 0 Leading 2.12 (a) pR (t ) = ( 359.3cos ๏ท t )( 35.93cos ๏ท t ) = 6455 + 6455cos2๏ท t W (b) px (t ) = ( 359.3cos ๏ท t ) ๏ฉ๏ซ14.37cos (๏ท t + 90๏ฐ ) ๏น๏ป = 2582 cos ( 2 cot + 90๏ฐ ) = −2582sin 2๏ท t W ( 2 ) 10 = 6455W Absorbed ( 2 ) 25 = 2582 VARS Delivered (c) P = V 2 R = 359.3 (d) Q = V 2 X = 359.3 2 2 (e) ( ๏ข − ๏ค ) = tan −1 ( Q / P ) = tan −1 ( 2582 6455 ) = 21.8๏ฐ Power factor = cos (๏ค − ๏ข ) = cos ( 21.8๏ฐ ) = 0.9285 Leading 2.13 Z = R − jxc = 10 − j 25 = 26.93 ๏ − 68.2๏ฐ ๏ i(t ) = ( 359.3 / 26.93 ) cos (๏ท t + 68.2๏ฐ ) = 13.34 cos (๏ท t + 68.2๏ฐ ) A (a) pR (t ) = ๏ฉ๏ซ13.34 cos (๏ท t + 68.2๏ฐ ) ๏น๏ป ๏ฉ๏ซ133.4cos (๏ท t + 68.2๏ฐ )๏น๏ป = 889.8 + 889.8cos ๏ฉ๏ซ2 (๏ท t + 68.2๏ฐ ) ๏น๏ป W (b) px (t ) = ๏ฉ๏ซ13.34 cos (๏ท t + 68.2๏ฐ ) ๏น๏ป ๏ฉ๏ซ333.5cos (๏ท t + 68.2๏ฐ − 90๏ฐ )๏น๏ป = 2224sin ๏ฉ๏ซ2 (๏ท t + 68.2๏ฐ ) ๏น๏ป W 4 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ( 2 10 = 889.8 W ( 2 25 = 2224 VAR S (c) P = I 2 R = 13.34 (d) Q = I 2 X = 13.34 ) 2 ) 2 (e) pf = cos ๏ฉ๏ซ tan −1 ( Q / P ) ๏น๏ป = cos ๏ฉ๏ซ tan −1 (2224 / 889.8) ๏น๏ป = 0.3714 Leading 2.14 (a) ๐ผฬ = 2∠0°๐๐ด V = Z I = ( 3๏ − 45๏ฐ )( 2๏0๏ฐ ) = 6๏ − 45๏ฐ kV ๏ต (t ) = 6 2 cos (๏ท t − 45๏ฐ ) kV p (t ) = ๏ต (t )i (t ) = ๏ฉ๏ซ6 2 cos (๏ท t − 45๏ฐ ) ๏น๏ป ๏ฉ๏ซ 2 2 cos ๏ท t ๏น๏ป ๏ฆ1๏ถ = 24 ๏ง ๏ท ๏ฉ๏ซcos ( −45๏ฐ ) + cos ( 2๏ท t − 45๏ฐ ) ๏น๏ป ๏จ2๏ธ = 8.49 + 12cos ( 2๏ท t − 45๏ฐ ) MW (b) ๐ = ๐๐ผ ๐๐๐ (๐ฟ − ๐ฝ) = 6 × 2 ๐๐๐ (−45° − 0°) = 8.49 ๐๐ Delivered (c) Q = VI sin (๏ค − ๏ข ) = 6 ๏ด 2sin ( −45๏ฐ − 0๏ฐ ) = −8.49MVAR Delivered = + 8.49MVAR Absorbed (d) pf = cos (๏ค − ๏ข ) = cos ( −45๏ฐ − 0๏ฐ ) = 0.707 Leading ( 2.15 (a) I = ๏ฉ 4 ๏ซ ) 2 ๏60๏ฐ๏น ( 2๏30๏ฐ ) = 2 ๏30๏ฐ A ๏ป i(t ) = 2 cos (๏ท t + 30๏ฐ ) A with ๏ท = 377 rad/s p(t ) = ๏ต (t )i(t ) = 4 ๏ฉ๏ซcos30๏ฐ + cos ( 2๏ท t + 90๏ฐ ) ๏น๏ป = 3.46 + 4 cos ( 2๏ท t + 90๏ฐ ) W (b) ๏ต(t), i(t), and p(t) are plotted below. (c) The instantaneous power has an average value of 3.46 W, and the frequency is twice that of the voltage or current. 5 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 2.16 (a) ๐ฬ ฬถ = 10 + ๐120๐ × 0.04 = 10 + ๐15.1 = 18.1∠56.4° ๐บ pf = cos56.4๏ฐ = 0.553 Lagging (b) V = 120 ๏0๏ฐ V The current supplied by the source is I = (120 ๏0๏ฐ ) (18.1๏56.4๏ฐ ) = 6.63๏ − 56.4๏ฐ A The real power absorbed by the load is given by P = 120 ๏ด 6.63 ๏ด cos56.4๏ฐ = 440 W which can be checked by I 2 R = ( 6.63) 10 = 440 W 2 The reactive power absorbed by the load is Q = 120 x 6.63 x sin56.4° = 663 VAR (c) Peak Magnetic Energy = W = LI 2 = 0.04 ( 6.63 ) = 1.76 J 2 Q = ๏ทW = 377 ๏ด 1.76 = 663VAR is satisfied. ฬถ ฬ|2 = ๐๐๐ฟ๐ผ 2 2.17 (a) ๐ฬ = ๐ฬ ๐ผฬ∗ = ๐ฬ๐ผฬถ ฬ๐ผฬ∗ = ๐ฬ|๐ผ Q = Im[ S ] = ๏ท LI 2 ๏ฌ (b) ๏ต (t ) = L di = − 2๏ท L I sin (๏ท t + ๏ฑ ) dt p(t ) = ๏ต (t ) ๏ i(t ) = −2๏ท L I 2 sin (๏ทt + ๏ฑ ) cos (๏ทt + ๏ฑ ) = −๏ท L I 2 sin 2 (๏ทt + ๏ฑ ) ๏ฌ = − Q sin 2 (๏ทt + ๏ฑ ) ๏ฌ Average real power P supplied to the inductor = 0 ๏ฌ 6 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Instantaneous power supplied (to sustain the changing energy in the magnetic field) has a maximum value of Q. ๏ฌ 2.18 (a) S = V I * = Z I I * = Re ๏ฉ๏ซ Z I 2 ๏น๏ป + j Im ๏ฉ๏ซ Z I 2 ๏น๏ป = P + jQ ๏P = Z I cos ๏Z ; Q = Z I 2 sin ๏Z ๏ฌ 2 (b) Choosing i(t ) = 2 I cos ๏ท t , Then ๏ต (t ) = 2 Z I cos (๏ทt + ๏Z ) ๏ p(t ) = ๏ต (t ) ๏ i(t ) = Z I 2 cos (๏ท t + ๏Z ) ๏ cos ๏ทt = Z I 2 ๏ฉ๏ซ cos ๏Z + cos ( 2๏ท t + ๏Z ) ๏น๏ป = Z I 2 ๏ cos ๏Z + cos2๏ท t cos ๏Z − sin 2๏ท t sin ๏Z ๏ = P (1 + cos2๏ท t ) − Q sin 2๏ท t ๏ฌ 1 (c) ๐ฬ ฬถ = ๐ + ๐๐๐ฟ + ๐๐๐ถ From part (a), ๐ = ๐ ๐ผ 2 and ๐ = ๐๐ฟ + ๐๐ถ 1 where ๐๐ฟ = ๐๐ฟ๐ผ 2 and ๐๐ถ = − ๐๐ถ ๐ผ 2 which are the reactive powers into L and C, respectively. Thus p(t ) = P (1 + cos2๏ท t ) − QL sin 2๏ท t − QC sin 2๏ท t ๏ฌ If ๏ท 2 LC = 1, Then QL + QC = Q = 0 ๏ผ ๏ฏ ๏ฝ ๏ฌ p(t ) = P (1 + cos2๏ทt ) ๏ฏ ๏พ ∗ 150 5 2.19 (a) ๐ฬ = ๐ฬ ๐ผฬ∗ = ( ∠10°) ( ∠ − 50°) = 375∠60° √2 √2 = 187.5 + ๐324.8 P = Re S = 187.5 W Absorbed Q = Im S = 324.8 VAR SAbsorbed (b) pf = cos ( 60๏ฐ ) = 0.5 Lagging (c) QS = P tan QS = 187.5tan ๏ซ๏ฉcos−1 0.9๏ป๏น = 90.81VAR S QC = QL − QS = 324.8 − 90.81 = 234 VAR S 7 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 2.20 Y1 = 1 1 = = 0.05๏ − 30๏ฐ = ( 0.0433 − j 0.025 ) S = G1 − jB1 Z1 20๏30๏ฐ Y2 = 1 1 = = 0.04๏ − 60๏ฐ = ( 0.02 − j 0.03464 ) S = G2 + jB2 Z 2 25๏60๏ฐ P1 = V 2 G1 = (100 ) 0.0433 = 433 W Absorbed 2 Q1 = V 2 B1 = (100 ) 0.025 = 250 VAR S Absorbed 2 P2 = V 2 G2 = (100 ) 0.02 = 200 W Absorbed 2 Q2 = V 2 B2 = (100 ) 0.03464 = 346.4 VAR SAbsorbed 2 2.21 (a) ๏ฆL = cos−1 0.6 = 53.13๏ฐ QL = P tan ๏ฆL = 500 tan 53.13๏ฐ = 666.7 kVAR ๏ฆS = cos−1 0.9 = 25.84๏ฐ QS = P tan ๏ฆS = 500 tan 25.84๏ฐ = 242.2 kVAR QC = QL − QS = 666.7 − 242.2 = 424.5 kVAR SC = QC = 424.5 kVA (b) The Synchronous motor absorbs Pm = ( 500 ) 0.746 = 414.4 kW and Q = 0 kVAR 0.9 m Source PF = cos ๏ฉ๏ซtan −1 ( 666.7 914.4 ) ๏น๏ป = 0.808 Lagging 8 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 1 ๐1 1 2.22 (a) ๐ฬ1 = ฬ ฬถ = (4+๐5) = 1 = 0.16∠ − 51.34° 6.4∠51.34° = (0.1 − ๐0.12)๐ 1 1 ๐ฬ2 = ๐ฬ ฬถ = 10 = 0.1๐ 2 ๐ 1000 ๐ = ๐ 2 (๐บ1 + ๐บ2 ) ⇒ ๐ = √ =√ = 70.71 V (0.1 + 0.1) ๐บ1 + ๐บ2 ๐1 = ๐ 2 ๐บ1 = (70.71)2 0.1 = 500๐ ๐2 = ๐ 2 ๐บ2 = (70.71)2 0.1 = 500๐ (b) ๐ฬ๐๐ = ๐ฬ1 + ๐ฬ2 = (0.1 − ๐0.12) + 0.1 = 0.2 − ๐0.12 = 0.233∠ − 30.96° ๐ ๐ผ๐ = ๐ ๐๐๐ = 70.71(0.233) = 16.48๐ด 2.23 ๐ฬ = ๐ฬ ๐ผ ∗ฬ = (120)(12∠ − 30°) = 1440∠ − 30° = 1247 − ๐720 ๐ = ๐ ๐(๐ฬ ) = 1247 ๐ Delivered ๐ = ๐ผ๐๐๐(๐ฬ ) = 720 var Absorbed 2.24 (a) Apparent power = S = (120 V)(8 A) = (960 VA). Real power = P = S * pf = 960 * 0.96 = 825.6 W. Reactive power = Q = √๐ 2 − ๐2 = √9602 − 825.62 = −490 var. (b) R = ๐ 2 /๐ = (120 V)2 /825.6W = 17.442 Ω, ๐2 (120 V)2 ๐๐ = ๐ = 490 var = 29.39 Ω. ๐ถ= 2.25 1 1 = = 90.2 ๐F ๐๐๐ 2๐60⋅29.39 Ω ๐ −๐2 100−100∠๐ = = 17.68 sin ๐ + ๐(−17.68 + 1.77 cos ๐). ๐ ๐(2⋅๐๐⋅60)(0.015) ๐ผ= 1 ๐ = ๐๐ผ ∗ = 1768 sin ๐ + ๐ (1768 − 177 cos ๐). ๐๐๐ฅ(๐ ๐๐๐(๐)) = 1768 W. 2.26 (a) The problem is modeled as shown in figure below: PL = 120 kW pfL = 0.85Lagging ๏ฑ L = cos−1 0.85 = 31.79๏ฐ Power triangle for the load: 9 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. SL = PL + jQL = 141.18๏31.79๏ฐ kVA QL = PL tan ( 31.79๏ฐ ) I = SL / V = 141,180 / 480 = 294.13A = 74.364 kVAR Real power loss in the line is zero. Reactive power loss in the line is ๐๐ฟ๐ผ๐๐ธ = ๐ผ 2 ๐๐ฟ๐ผ๐๐ธ = (294.13)2 1 = 86.512 kVAR ๏ SS = PS + jQS = 120 + j ( 74.364 + 86.512 ) = 200.7๏53.28๏ฐ kVA The input voltage is given by VS = SS / I = 682.4 V(rms) The power factor at the input is cos53.28๏ฐ = 0.6 Lagging (b) Applying KVL, ๐ฬ๐ = 480∠0° + ๐1.0(294.13∠ − 31.79°) = 635 + j 250 = 682.4๏21.5๏ฐ V (rms) ( pf )S = cos ( 21.5๏ฐ + 31.79๏ฐ ) = 0.6 Lagging 2.27 The circuit diagram is shown below: Pold = 50 kW; cos−1 0.8 = 36.87๏ฐ; ๏ฑOLD = 36.87๏ฐ; Qold = Pold tan (๏ฑold ) = 37.5kVAR ∴ ๐ฬ๐๐๐ = 50,000 + ๐37,500 ๏ฑ new = cos−1 0.95 = 18.19๏ฐ; Snew = 50,000 + j 50,000 tan (18.19๏ฐ ) = 50,000 + j16,430 Hence Scap = Snew − Sold = − j 21,070 VA ๏C = 2.28 21,070 ( 377)( 220 ) 2 = 1155๏ญ F ๏ฌ S1 = 15 + j 6.667 S 2 = 3 ( 0.96 ) − j 3 ๏ฉ๏ซsin ( cos −1 0.96 ) ๏น๏ป = 2.88 − j 0.84 S3 = 15 + j 0 STOTAL = S1 + S 2 + S3 = ( 32.88 + j 5.827 ) kVA (i) Let ๐ฬ ฬถ be the impedance of a series combination of R and X 10 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๐ฬ ∗ ๐2 Since ๐ฬ = ๐ฬ ๐ผฬ∗ = ๐ฬ (๐ฬ )ฬถ = ๐ฬ ∗ฬถ , it follows that ๐ฬ ∗ฬถ = (240)2 ๐2 = = (1.698 − ๐0.301) ๐บ (32.88 + ๐5.827)103 ๐ฬ ∴ ๐ฬ ฬถ = (1.698 + ๐0.301)๐บ ← (ii) Let ๐ฬ ฬถ be the impedance of a parallel combination of R and X ( 240 ) = 1.7518 ๏ R= ( 32.88)103 2 240 ) ( X= = 9.885 ๏ ( 5.827 )103 2 Then ๏ Z = (1.7518 j 9.885 ) ๏ ๏ฌ 2.29 Since complex powers satisfy KCL at each bus, it follows that ๐ฬ13 = (1 + ๐1) − (1 − ๐1) − (0.4 + ๐0.2) = −0.4 + ๐1.8 ∗ ๐ฬ31 = −๐ฬ13 = 0.4 + ๐1.8 ← ← Similarly, ๐ฬ23 = (0.5 + ๐0.5) − (1 + ๐1) − (−0.4 + ๐0.2) = −0.1 − ๐0.7 ∗ ๐ฬ32 = −๐ฬ23 = 0.1 − ๐0.7 ← ← At Bus 3, ๐ฬ๐บ3 = ๐ฬ31 + ๐ฬ32 = (0.4 + ๐1.8) + (0.1 − ๐0.7) = 0.5 + ๐1.1 ← 2.30 (a) For load 1: ๏ฑ1 = cos−1 (0.28) = 73.74๏ฐ Lagging S1 = 125๏73.74๏ฐ = 35 + j120 S2 = 10 − j 40 S3 = 15 + j 0 STOTAL = S1 + S2 + S3 = 60 + j80 = 100๏53.13๏ฐ kVA = P + jQ ๏ PTOTAL = 60 kW; QTOTAL = 80 kVAR; kVA TOTAL = STOTAL = 100 kVA. ๏ฌ Supply pf = cos ( 53.13๏ฐ ) = 0.6 Lagging ๏ฌ (b) ITOTAL = S * 100 ๏ด 103 ๏ − 53.13๏ฐ = = 100๏ − 53.13๏ฐ A V* 1000๏0๏ฐ At the new pf of 0.8 lagging, PTOTAL of 60kW results in the new reactive power ๐ ′ , such that ๏ฑ ๏ข = cos−1 ( 0.8 ) = 36.87๏ฐ and Q๏ข = 60 tan ( 36.87๏ฐ ) = 45 kVAR ∴The required capacitor’s kVAR is QC = 80 − 45 = 35 kVAR ๏ฌ ๐2 (1000)2 It follows then ๐๐ถ = ๐ฬ ∗ = ๐35000 = −๐28.57 ๐บ ๐ถ 11 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. C= and 106 = 92.85๏ญ F ๏ฌ 2๏ฐ ( 60 )( 28.57 ) ๐ฬ ′∗ The new current is ๐ผ ′ = ๐ฬ ∗ = 60,000−๐45,000 = 60 − ๐45 = 75๏ − 36.87๏ฐ A 1000∠0° The supply current, in magnitude, is reduced from 100A to 75A ๏ฌ ๐ ∠๐ฟ1 −๐2 ∠๐ฟ2 ๐ ๐ = ( 1 ∠๐ฟ1 − 90°) − 2 ∠๐ฟ2 − 90° ๐∠90° ๐ ๐ 2.31 (a) ๐ผฬ12 = 1 V ๏ฉV ๏น Complex power S12 = V1 I12* = V1๏๏ค1 ๏ช 1 ๏90๏ฐ − ๏ค1 − 2 ๏90๏ฐ − ๏ค 2 ๏บ X ๏ซX ๏ป 2 V VV = 1 ๏90๏ฐ − 1 2 ๏90๏ฐ + ๏ค1 − ๏ค 2 X X ∴ The real and reactive power at the sending end are P12 = Q12 = V12 VV cos90๏ฐ − 1 2 cos ( 90๏ฐ + ๏ค1 − ๏ค 2 ) X X VV = 1 2 sin (๏ค1 − ๏ค 2 ) ๏ฌ X V12 VV sin 90๏ฐ − 1 2 sin ( 90๏ฐ + ๏ค1 − ๏ค 2 ) X X V = 1 ๏ฉ๏ซV1 − V2 cos (๏ค1 − ๏ค 2 ) ๏น๏ป ๏ฌ X Note: If ๐ฬ1 leads ๐ฬ2 , ๐ฟ = ๐ฟ1 − ๐ฟ2 is positive and the real power flows from node 1 to node 2. If ๐ฬ1 Lags ๐ฬ2 , ๐ฟ is negative and power flows from node 2 to node 1. (b) Maximum power transfer occurs when ๐ฟ = 90° = ๐ฟ1 − ๐ฟ2 PMAX = ← V1V2 ๏ฌ X 2.32 4 Mvar minimizes the real power line losses, while 4.5 Mvar minimizes the MVA power flow into the feeder. 12 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 2.33 2.34 Qcap MW Losses Mvar Losses 0 0.42 0.84 0.5 0.4 0.8 1 0.383 0.766 1.5 0.369 0.738 2 0.357 0.714 2.5 0.348 0.696 3 0.341 0.682 3.5 0.337 0.675 4 0.336 0.672 4.5 0.337 0.675 5 0.341 0.682 5.5 0.348 0.696 6 0.357 0.714 6.5 0.369 0.738 7 0.383 0.766 7.5 0.4 0.801 8 0.42 0.84 8.5 0.442 0.885 9 0.467 0.934 9.5 0.495 0.99 10 0.525 1.05 7.5 Mvars 13 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 2.35 ๏ฉ(.3846 + .4950 ) + j (10 − 1.923 − 4.950 ) ๏ช − (.4950 − j 4.950 ) ๏ซ๏ช − (.4950 − j 4.950 ) ๏น ๏ฉV10 ๏น (.3846 + .4950 ) + j (10 − 1.923 − 4.95 )๏บ๏ป๏บ ๏ช๏ซV20 ๏บ๏ป ๏ฉ1.961๏ − 48.69๏ฐ๏น =๏ช ๏บ ๏ซ1.961๏ − 78.69๏ฐ ๏ป [ 0.8796 + ๐3.127 −0.4950 + ๐4.950 ๐ฬ10 1.961∠ − 48.69° ][ ] = [ ] −0.4950 + ๐4.950 0.8796 + ๐3.127 ๐ฬ20 1.961∠ − 78.69° 2.36 Note that there are two buses plus the reference bus and one line for this problem. After converting the voltage sources in Fig. 2.29 to current sources, the equivalent source impedances are: Z S1 = Z S 2 = ( 0.1 + j 0.5 ) // ( − j 0.1) = = ( 0.1 + j 0.5)( − j 0.1) 0.1 + j 0.5 − j 0.1 ( 0.5099๏78.69๏ฐ)( 0.1๏ − 90๏ฐ ) = 0.1237๏ − 87.27๏ฐ 0.4123๏75.96๏ฐ = 0.005882 − j 0.1235 ๏ The rest is left as an exercise to the student. 2.37 After converting impedance values in Figure 2.30 to admittance values, the bus admittance matrix is: 1 −1 0 0 1 1 1 1 1 −1 (1 + + + − ๐1) − ( − ๐1) −( ) 2 3 4 3 4 1 1 1 1 1 ๐ฬ๐๐ข๐ = 0 − ( − ๐1) ( − ๐1 + ๐ + ๐ ) − (๐ ) 3 3 4 2 4 1 1 1 1 1 0 −( ) − (๐ ) ( +๐ −๐ ) [ 4 4 4 4 3 ] Writing nodal equations by inspection: ๐ฬ10 −1 0 0 1 1∠0° −0.25 ๐ฬ20 −1 (2.083 − ๐1) (−0.3333 + ๐1) 0 =[ [ (−0.3333 ] ] −๐0.25 + ๐1)(0.3333 − ๐0.25) 0 0 ๐ฬ30 (0.25 − ๐0.08333) [๐ฬ ] −๐0.25 (−0.25) 0 2∠30° 40 14 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 2.38 The admittance diagram for the system is shown below: ๐ฬ11 ๐ฬ ๐ฬ๐ต๐๐ = 21 ๐ฬ31 [๐ฬ41 where ๐ฬ12 ๐ฬ22 ๐ฬ32 ๐ฬ42 ๐ฬ13 ๐ฬ23 ๐ฬ33 ๐ฬ43 ๐ฬ14 0 −8.5 2.5 5.0 ๐ฬ24 0 2.5 −8.75 5.0 = ๐[ ]๐ ฬ๐34 12.5 5.0 5.0 −22.5 0 0 12.5 −12.5 ๐ฬ44 ] ๐ฬ11 = ๐ฆฬ10 + ๐ฆฬ12 + ๐ฆฬ13 ; ๐ฬ22 = ๐ฆฬ 20 + ๐ฆฬ12 + ๐ฆฬ 23 ; ๐ฬ33 = ๐ฆฬ13 + ๐ฆฬ 23 + ๐ฆฬ 34 ๐ฬ44 = ๐ฆ34 ; ๐ฬ12 = ๐ฬ21 = −๐ฆฬ12 ; ๐ฬ13 = ๐ฬ31 = −๐ฆฬ13 ; ๐ฬ23 = ๐ฬ32 = −๐ฆฬ 23 and ๐ฬ34 = ๐ฬ43 = −๐ฆฬ 34 2.39 (a) ๐ฬ๐ + ๐ฬ๐ + ๐ฬ๐ −๐ฬ๐ ๐ฬ1 ๐ผฬ1 = 0 −๐ฬ๐ −๐ฬ๐ ฬ ฬ ฬ ฬ ฬ −๐๐ ๐๐ + ๐๐ + ๐๐ ๐2 ๐ผฬ = 0 −๐ฬ๐ −๐ฬ๐ = 2 ๐ฬ3 ๐ผฬ3 −๐ฬ๐ −๐ฬ๐ 0 ๐ฬ๐ + ๐ฬ๐ + ๐ฬ๐ ฬ ฬ ฬ ๐๐ + ๐๐ + ๐๐ ] [๐ฬ4 ] [ ๐ผฬ4 ] −๐ฬ๐ −๐ฬ๐ 0 [ 0 −14.5 8 4 2.5 ๐ฬ1 ฬ ๐ 0 8 −17 4 5 (b) ๐ [ ] ฬ2 = [ ] 4 −8.8 0 1∠ − 90° 4 ๐3 0.62∠ − 135° 2.5 5 0 −8.3 [๐ฬ4 ] −1 ฬ −1 ฬ ๐ฬ๐ต๐๐ ๐ฬ = ๐ผฬ; ๐ฬ๐ต๐๐ ๐๐ต๐๐ ๐ฬ = ๐ฬ๐ต๐๐ ๐ผ where 0.71870.66880.63070.6194 0.66880.70450.62420.6258 −1 ฬถ ๐ฬ๐ต๐๐ = ๐ฬ๐ต๐๐ = ๐[ ] ๐บ 0.63070.70450.68400.5660 0.61940.62580.56600.6840 15 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. −1 ฬ ๐ฬ = ๐ฬ๐ต๐๐ ๐ผ ๐ฬ1 0 ฬ2 ๐ 0 ๐ฬ = and ๐ผฬ = [ ] ฬ๐3 1∠ − 90° 0.62∠ − 135° [๐ฬ4 ] where Then solve for ๐ฬ1, ๐ฬ2 , ๐ฬ3 , and ๐ฬ4 . 2.40 (a) ๐ฬ ๐๐ = 240 ∠0° = 138.56∠0° V (Assumed as reference) √3 ๐ฬ ๐๐ = 240∠30°V; ๐ฬ ๐๐ = 240∠ − 90°V; ๐ผ๐ดฬ = 12∠ − 90°A ฬ ๐ 138.56∠0° ๐ฬ ๐ = ๐ผ๐ด๐ = 12∠−90° = 11.55∠90° = 0 + ๐11.55 Ω ฬ ๐ด ๐ผฬ 12 √ √(3) ฬ = ๐ด ∠30° = (b) ๐ผ๐๐ 3 ∠(−90° + 30°) = 6.93∠ − 60°A ฬ ๐ 240∠30° ๐ฬ Δ = ๐ผ ฬ ๐ด๐ต = 6.93∠−60°A = 34.6∠90° = (0 + ๐34.6)Ω ๐ด๐ต Note: ๐ฬ๐ = ๐ฬ๐ฅฬถ /3 2.41 S3๏ฆ = 3VLL I L ๏ cos −1 ( pf ) = 3 ( 480 )( 20 ) ๏ cos −1 0.8 = 16.627 ๏ด 10 3 ๏36.87๏ฐ = (13.3 ๏ด 10 3 ) + j (9.976 ๏ด 10 3 ) P3๏ฆ = Re S3๏ฆ = 13.3 kW Delivered Q3๏ฆ = I m S3๏ฆ = 9.976 kVAR Delivered 2.42 (a) With ๐ฬ๐๐ as reference ๐ฬ๐ฅฬถ = 4 + ๐3 = 5∠36.87° ๐บ 3 208 ๐ฬ๐๐ = 3 ∠ − 30° √ Ia = Van 120.1๏ − 30๏ฐ = = 24.02๏ − 66.87๏ฐ A ( Z๏ / 3) 5๏36.87๏ฐ ๐ฬ3๐ = 3๐ฬ๐๐ ๐ผฬ๐∗ = 3(120.1∠ − 30°)(24.02∠ + 66.87°) = 8654∠36.87° = 6923 + ๐5192 P3๏ฆ = 6923 W; Q3๏ฆ = 5192 VAR; both absorbed by the load pf = cos ( 36.87๏ฐ ) = 0.8 Lagging; S3๏ฆ = S3๏ฆ = 8654 VA (b) 16 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Vab = 208๏0๏ฐ V I a = 24.02๏ − 66.87๏ฐ A 13.87๏ − 36.87๏ฐ A 2.43 (a) Transforming the ๏-connected load into an equivalent Y, the impedance per phase of the equivalent Y is ๐ฬ2ฬถ = 60 − ๐45 = (20 − ๐15) ๐บ 3 With the phase voltage V1 = 1203 3 = 120 V taken as a reference, the per-phase equivalent circuit is shown below: Total impedance viewed from the input terminals is Z = 2 + j4 + I= ( 30 + j 40 )( 20 − j15 ) = 2 + j 4 + 22 − j 4 = 24 ๏ ( 30 + j 40 ) + ( 20 − j15 ) V1 120๏0๏ฐ = = 5๏0๏ฐ A Z 24 The three-phase complex power supplied = S = 3V1 I * = 1800 W P = 1800 W and Q = 0VAR delivered by the sending-end source (b) Phase voltage at load terminals ๐ฬ2 = 120∠0° − (2 + ๐4)(5∠0°) = 110 − j 20 = 111.8๏ − 10.3๏ฐ V The line voltage magnitude at the load terminal is (VLOAD )L -L = 3 111.8 = 193.64 V (c) The current per phase in the Y-connected load and in the equiv.Y of the ๏-load: I1 = V2 = 1 − j 2 = 2.236๏ − 63.4๏ฐ A Z1 I2 = V2 = 4 + j 2 = 4.472 ๏26.56๏ฐ A Z2 17 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. The phase current magnitude in the original ๏-connected load = 2.582 A ( I ) = I 3 = 4.472 3 2 ph ๏ (d) The three-phase complex power absorbed by each load is S1 = 3V2 I1* = 450 W + j 600VAR S2 = 3V2 I 2* = 1200 W − j 900VAR The three-phase complex power absorbed by the line is SL = 3 ( RL + jX L ) I 2 = 3 ( 2 + j 4 ) (5)2 = 150 W + j 300 VAR The sum of load powers and line losses is equal to the power delivered from the supply: S1 + S2 + SL = ( 450 + j 600 ) + (1200 − j 900 ) + (150 + j 300 ) = 1800 W+ j 0 VAR 2.44 ๐๐๐ = ๐∠0° because load is resistive. So ๐๐๐ = ๐∠ − 120°, ๐๐๐ = ๐∠ + 120°. ๐๐๐ = ๐๐๐ − ๐๐๐ = −√3 ๐∠180°. So phase angle of ๐๐๐ = 180°. 2.45 ๐๐๐๐,๐ฆ = ๐๐๐๐,๐๐๐๐ก๐ = −๐ 3 1 ; ๐๐ถ ๐๐๐๐1 = ๐๐ฟ1 ; ๐๐๐๐2 = ๐๐ฟ2 ; 3 ๐2 ๐= ๐; unity power factor requires ๐๐ก๐๐ก๐๐ = ๐๐ + ๐๐ฟ1 + ๐๐ฟ2 = 0; 1 1 1 ๐ ๐ฟ1 ๐ฟ2 0=๐ +๐ +๐ 1 3 1 2 1 3 = −3๐๐ถ + ๐๐ฟ + ๐๐ฟ ; 1 2 1 ๐ = √(๐ฟ + ๐ฟ ) (3๐ถ ) = 1500; ๐ ๐ = 2๐ = 239 Hz 2.46 (a) ฬฬถ ๐๐ฅ /3 Using voltage division: ๐ฬ๐ด๐ = ๐ฬ๐๐ (๐ ฬถ /3)+๐ ฬฬถ ๐ฅ ๐ฟ๐ผ๐๐ธ 18 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. = = 208 3 ๏0๏ฐ 10๏30๏ฐ 10๏30๏ฐ + ( 0.8 + j 0.6 ) (120.09 )(10๏30๏ฐ) = 1200.9๏30๏ฐ 9.46 + j 5.6 10.99๏30.62๏ฐ = 109.3๏ − 0.62๏ฐ V Load voltage = VAB = 3 (109.3) = 189.3V Line-to-Line (b) Zeq = 10 ๏30 ๏ฐ || (− j 20) = 11.547 ๏0 ๏ฐ๏ VAN = Van Z eq Z eq + Z LINE ( = 208 = 3 ) (11.54711.547 + 0.8 + j 0.6 ) 1386.7 = 112.2๏ − 2.78๏ฐ V 12.362๏2.78๏ฐ Load voltage Line-to-Line VAB = 3 (112.2 ) = 194.3 V 2.47 (a) I G1 = 15 ๏ด 103 3 ( 460 )( 0.8 ) ๏ − cos −1 0.8 = 23.53๏ − 36.87๏ฐ A 460 ๏0๏ฐ − (1.4 + j1.6 )( 23.53๏ − 36.87๏ฐ ) 3 = 216.9๏ − 2.73๏ฐ V Line to Neutral VL = VG1− Z LINE1 I G1 = Load Voltage VL = 3 216.9 = 375.7 V Line to line (b) I L = 30 ๏ด 103 3 ( 375.7 )( 0.8 ) ๏ − 2.73๏ฐ − cos−1 0.8 = 57.63๏ − 39.6๏ฐ A 19 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๐ผฬ๐บ2 = ๐ผฬ๐ฟ − ๐ผฬ๐บ1 = 57.63∠ − 39.6° − 23.53∠ − 36.87° = 34.14๏ − 41.49๏ฐ A ฬถ ๐ฬ๐บ2 = ๐ฬ๐ฟ + ๐ฬ๐ฟ๐ผ๐๐ธ2 ๐ผฬ๐บ2 = 216.9∠ − 2.73° + (0.8 + ๐1)(34.14∠ − 41.49°) = 259.7๏ − 0.63๏ฐ V Generator 2 line-to-line voltage ๐๐บ2 = √3(259.7) = 449.8V (c) ๐ฬ๐บ2 = 3๐ฬ๐บ2 ๐ผฬ๐บ2∗ = 3(259.7∠ − 0.63°)(34.14∠41.49°) = 20.12 × 103 + ๐17.4 × 103 PG 2 = 20.12 kW; QG 2 = 17.4 kVAR; Both delivered 2.48 (a) (b) pf = cos31.32๏ฐ = 0.854 Lagging (c) I L = SL 3VLL = 26.93 ๏ด 103 3 ( 480 ) = 32.39 A (d) QC = QL = 14 ๏ด 103 VAR = 3 (VLL ) / X ๏ 2 X๏ = 3 ( 480 ) 2 14 ๏ด 103 = 49.37 ๏ I C = VLL / X ๏ = 480 / 49.37 = 9.72 A (e) I LINE = PL 3 VLL = 23 ๏ด 103 3 480 = 27.66 A 2.49 (a) Let ๐ฬ๐ฬถ = ๐ฬ๐ดฬถ = ๐ฬ๐ตฬถ = ๐ฬ๐ถฬถ for a balanced Y-load ฬถ = ๐ฬ ฬถ = ๐ฬ ฬถ ๐ฬ๐ฅฬถ = ๐ฬ๐ด๐ต ๐ต๐ถ ๐ถ๐ด Using equations in Fig. 2.27 ฬ 2ฬถ ฬ 2ฬถ ฬ 2ฬถ ๐ +๐ +๐ ๐ฬ๐ฅฬถ = ๐ ๐ฬ๐ฬถ ๐ = 3๐ฬ๐ฬถ ๐ and 20 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ฬ 2ฬถ ฬฬถ ๐ ๐ ๐ฬ๐ฬถ = ๐ฬ ฬถ +๐ฬ๐ฅฬถ +๐ฬ ฬถ = 3๐ฅ ๐ฅ (b) Z A = ZB = ๐ฅ ๐ฅ ( j10 )( − j 25) = − j 50 ๏ j10 + j 20 − j 25 ( j10 )( j 20 ) = j 40 ๏; Z = ( j 20 )( − j 25) = − j 100 ๏ C j5 j5 2 2.50 Replace delta by the equivalent WYE: ๐ฬ๐ฬถ = −๐ 3 ๐บ Per-phase equivalent circuit is shown below: 2 Noting that (๐1.0 โ−๐ 3) = −๐2, by voltage-divider law, −๐2 ๐ฬ1 = −๐2+๐0.1 (100∠0°) = 105∠0° ๏๏ต1 (t ) = 105 2 cos (๏ท t + 0๏ฐ) = 148.5cos ๏ท t V ๏ฌ In order to find ๐2 (๐ก) in the original circuit, let us calculate ๐ฬ๐ด′ ๐ต′ ๐ฬ๐ด′๐ต′ = ๐ฬ๐ด′ ๐′ − ๐ฬ๐ต′ ๐′ = √3๐ ๐30° ๐ฬ๐ด′๐′ = 173.2∠30° Then 173.2∠30° ๐ผฬ๐ด′ ๐ต′ = = 86.6∠120° −๐2 ๏i2 (t ) = 86.6 2 cos (๏ทt + 120๏ฐ ) = 122.5cos (๏ท t + 120๏ฐ ) A ๏ฌ 1 (150 + j120 ) = ( 50 + j 40 ) kVA 3 2.51 On a per-phase basis S1 = ๏ I1 = ( 50 − j 40 )103 = 25 − j 20 A ( ) 2000 Note: PF Lagging Load 2: Convert ๏ into an equivalent Y 1 (150 − j 48 ) = ( 50 − j16 ) ๏ 3 2000๏0๏ฐ ๏ I2 = = 38.1๏17.74๏ฐ 50 − j16 Z 2Y = = ( 36.29 + j 11.61) A Note: PF Leading 21 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 1 S3 per phase = ๏ฉ๏ซ(120 ๏ด 0.6 ) − j 120sin( cos −1 0.6 ) ๏น๏ป = ( 24 − j32 ) kVA 3 ๏ I3 = ( 24 + j32 )103 = 12 + j 16 A ( ) 2000 Note:PF Leading Total current drawn by the three parallel loads ๐ผฬ๐ = ๐ผฬ1 + ๐ผฬ2 + ๐ผฬ3 ITOTAL = ( 73.29 + j 7.61) A Note:PF Leading Voltage at the sending end: ๐ฬ๐ด๐ = 2000∠0° + (73.29 + ๐7.61)(0.2 + ๐1.0) = 2007.05 + j 74.81 = 2008.44๏2.13๏ฐ V 3( 2008.44 ) = 3478.62 V ๏ฌ Line-to-line voltage magnitude at the sending end = 2.52 (a) Let ๐ฬ๐ด๐ be the reference: VAN = 2160 3 ๏0๏ฐ 2400๏0๏ฐ V Total impedance per phase ๐ฬ ฬถ = (4.7 + ๐9) + (0.3 + ๐1) = (5 + ๐10) ๐บ ๏ Line Current = 2400๏0๏ฐ = 214.7๏ − 63.4๏ฐ A = I A ๏ฌ 5 + j10 With positive A-B-C phase sequence, I B = 214.7๏ − 183.4๏ฐ A; I C = 214.7๏ − 303.4๏ฐ = 214.7๏56.6๏ฐ A ๏ฌ (b) (VA๏ขN ) LOAD = 2400๏0๏ฐ − ๏ฉ๏ซ( 214.7๏ − 63.4๏ฐ )( 0.3 + j1) ๏น๏ป = 2400๏0๏ฐ − 224.15๏9.9๏ฐ = 2179.2 − j38.54 = 2179.5๏ − 1.01๏ฐ V ๏ฌ (V ) B๏ขN LOAD = 2179.5๏ − 121.01๏ฐ V , ; (VC ๏ขN ) LOAD = 2179.5๏ − 241.01๏ฐ V , (c) S / Phase = (VA๏ขN )LOAD I A = ( 2179.5)( 214.7 ) = 467.94 kVA ๏ฌ Total apparent power dissipated in all three phases in the load ๏ฉ๏ซ S3๏ฆ ๏น๏ป = 3 ( 467.94 ) = 1403.82 kVA ๏ฌ LOAD Active power dissipated per phase in load = (๐1๐ ) ๐ฟ๐๐ด๐ท = ( 2179.5 )( 214.7 ) cos ( 62.39๏ฐ ) = 216.87 kW ๏ฌ ๏ ๏ฉ๏ซ P3๏ฆ ๏น๏ป LOAD = 3 ( 216.87 ) = 650.61kW ๏ฌ Reactive power dissipated per phase in load = (๐1๐ ) ๐ฟ๐๐ด๐ท = ( 2179.5 )( 214.7 ) sin ( 62.39๏ฐ ) = 414.65 kVAR ๏ฌ 22 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ ๏ฉ๏ซQ3๏ฆ ๏น๏ป LOAD = 3 ( 414.65 ) = 1243.95kVAR ๏ฌ (d) Line losses per phase ( P1๏ฆ ) ( ) Total line loss P3๏ฆ LOSS = ( 214.7 ) 0.3 = 13.83 kW ๏ฌ 2 LOSS = 13.83 ๏ด 3 = 41.49 kW ๏ฌ 23 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Chapter 3 Power Transformers 3.1 (a) Impedance as seen from primary is (221 kV / 18 A) = 12.28 kΩ. Impedances convert by the square of the turns ratio, 12.28๐พ so ๐๐ก = √ 400 = 5.540, ๐๐ 100: 18.05. (b) ๐ = ๐๐ผ ∗ = (221 kV)(18 A) = 3.98 MVA on the primary side; A on the secondary side (221 kV ∗ 0.1805) ∗ (18 0.1805) = 39,780 V ∗ 100 A = 3.978 MVA 3.2 ๐ 250 (1000∠0°) = 250∠0° ๐ ๐ฬ2 = 2 ๐ฬ1 = ๐1 ← 1000 ๐ 1000 (5∠ − 30°) = 20∠ − 30° ๐ด ๐ผฬ2 = 1 ๐ผฬ1 = ๐2 ← 250 ๐ฬ 2ฬถ = ๐ฬ2 250∠0° = = 12.5∠30° ๐บ ๐ผฬ2 20∠ − 30° ๐1 2 1000 2 ๐ฬ 2′ฬถ = ๐2ฬถ ( ) = (12.5∠30°) ( ) = 200∠30° ๐บ ๐2 250 (1000∠0°) Also ๐ฬ 2′ฬถ = ๐ฬ1 /๐ผฬ1 = (5∠−30°) = 200∠30° ๐บ ← ← 3.3 24 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 3.4 (a) E1 = N1 2400 E2 = ( 230 ) = 2300 V N2 240 ∗ ฬ −1 0.8 ∗ 3 ๐ 75×10 ∠ cos (b) ๐2ฬ = ๐ธฬ 2 ๐ผ2∗ฬ ; ๐ผ2ฬ = ( ฬ 2 ) = [ ๐ธ2 ฬ ๐ธ ๐ฬ 2 = 2ฬ = ๐ผ2 230 ] = 326.1∠ − 36.87° 230 = 0.706∠36.87°Ω = 0.565 + ๐0.523 326∠−36.87° 2 ๐ (c) ๐งฬ 1′ = ( 1) ๐2ฬ = 100๐ฬ 2 = 70.6∠36.87°Ω ๐2 (d) ๐1 = ๐2 = 75(. 8) = 60 kW ๐1 = ๐2 = 60 ∗ tan 36.87° = 45 kVar 3.5 (a) E1 = (b) N1 ๏ฆ 2400 ๏ถ E2 = ๏ง ๏ท ( 230 ) = 2300 V N2 ๏จ 240 ๏ธ ∗ ฬ 3 ๐ 125×10 ∠ −cos ๐2ฬ = ๐ธฬ 2 ๐ผ2∗ฬ ; ๐ผ2ฬ = (๐ธฬ 2 ) = [ 230 2 ฬ ๐ธ ๐2ฬ = ฬ 2 = ๐ผ2 −1 0.8 ∗ ] = 543.5∠36.87° 230 = 0.424∠ − 36.87°Ω = 0.339 − ๐0.254 543∠−36.87° 25 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 2 (c) ๐ ๐งฬ 1′ = (๐1 ) ๐2ฬ = 100๐2ฬ = 42.4∠ − 36.87°Ω (d) ๐1 = ๐2 = 125(. 8) = 100 kW 2 ๐1 = ๐2 = 100 ∗ tan −36.87° = −75 kVar supplied to primary winding 3.6 (a) E2 = 277๏0๏ฐ; E1 = E2 e j 30๏ฐ = 277๏30๏ฐ V 110×103 ) ∠ ๐๐๐ −1 0 . 8 = 397∠36.87°๐ด 277 ๐ (b) ๐ผฬ2 = (๐ธ2 ) ∠ ๐๐๐ −1 (๐๐น) = ( 2 ๐ผฬ1 = ๐ผฬ2 ∗ (๐ ๐30° ) = ๐ผฬ2 ๐ ๐30° = 397∠66.87°๐ด ฬ ๐ธ 277∠0° (c) ๐ฬ 2ฬถ = ๐ผฬ 2 = 397 ∠36.87° = 0.698∠ − 36.87° ๐บ 2 ฬ 1ฬถ ๐ 2 = ๐ฬ2ฬถ = 0.698∠ − 36.87° ๐บ (d) ๐ฬ1 = ๐ฬ2 = 110∠ − ๐๐๐ −1 0 . 8; kVA = 110∠ − 36.87° ๐ฬ1 = 88 ๐๐ − ๐66๐๐๐ด๐ delivered to primary 3.7 (a) For maximum power transfer to the load, ๐ ๐ฟ′ = ๐2 ๐ ๐ฟ = ๐ ๐ or 50๐2 = 1800 or ๐ = 6 = ๐1 /๐2 (b) By voltage division, ๏ต L๏ข = 5 2 sin 2t V (VL๏ข )RMS = 5V ๏ฉ(VL๏ข ) RMS ๏น๏ป 25 Pa๏ต = ๏ซ = W 13.9mW 1800 1800 2 26 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 3.8 ๏ต1 = (18sin10t ) 2 = 9sin10t V 1 3 1 ๏ต3 = ๏ต2 = 1.5sin10t V 2 ๏ตout (t ) = −2๏ต3 = −3sin10t V ๏ต2 = ๏ต1 = 3sin10t V 3.9 (a) Winding resistance or copper loss (b) Primary side: 0.5Ω, Secondary side: 0.2Ω. Secondary side referred to primary: 0.2Ω ⋅ 32 = 1.8Ω. Represent these losses with a series resistance on the primary side of 2.3 Ω. 3.10 Rated current magnitude on the 66-kV side is given by ๐ผ1 = 13,000 = 197.0๐ด 66 ๐ผ12 ๐ ๐๐ 1 = (197.0)2 ๐ ๐๐ 1 = 100 × 103 ∴ ๐ ๐๐ 1 = 2.58 ๐บ ฬถ = ๐๐๐1 5.5×103 197.0 ← 2 2 2 2 ฬถ 1 − ๐ ๐๐ = 27.9 ๐บ Then ๐๐๐ 1 = √๐๐๐ 1 = √(27.9) − (2.58) = 27.8 ๐บ ← Turns Ratio = a = N1 N 2 = 66 /11.5 = 5.74 3.11 With high-voltage side designated as 1, and L-V side as 2, (11.5 × 103 )2 ๐2 ๐บ๐ถ1 = 65 × 103 , based on O.C test. Note: To transfer shunt admittance from H-V side to L-V side, we need to multiply by a2. ๏GC1 = Y1 = 65 ๏ด 103 (11.5 ๏ด 10 ) ( 5.74 ) 3 2 2 = 14.9 ๏ด 10 −6 S ๏ฌ I2 1 30 1 ๏ด 2 = ๏ด = 79.2 ๏ด 10 −6 S 3 V2 a 11.5 ๏ด 10 ( 5.74 )2 ๏ Bm1 = Y12 − GC2 1 = 10 −6 ( 79.2 ) − (14.9 ) 2 2 = 77.79 ๏ด 10 −6 S ๏ฌ 27 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Total loss under rated conditions is approximately the sum of short-circuit and open-circuit test losses. ๏Efficiency๏จ FL = 10,000 ๏ด 100 = 98.38% ๏ฌ (10,000 ) + (100 + 65) 3.12 (a) Neglecting series impedance: E1 = N1 N ๏ฆ 2400 ๏ถ E2 = 1 V2 = ๏ง ๏ท 240๏0๏ฐ = 2400๏0๏ฐ V N2 N2 ๏จ 240 ๏ธ N2 240 I2 = ( 4.85) = 0.485A N1 2400 GC = P2 E12 = 173 ( 2400 ) = 3.003 ๏ด 10 −5 S 2 ๏ฆN ๏ถ YC = ๏ง 2 I 2 ๏ท E1 = 0.485 / 2400 = 2.021 ๏ด 10 −4 S ๏จ N1 ๏ธ Bm = YC2 − GC2 = ( 2.021 ๏ด 10 −4 ) − ( 3.003 ๏ด 10 −5 ) = 1.998 ๏ด 10 −4 S 2 2 YC = GC − jBm = 3.003 ๏ด 10 −5 − j1.998 ๏ด 10 −4 S = 2.021 ๏ด 10 −4 ๏ − 81.45๏ฐ S (b) ๐ ๐ผ1 650 ๐ ๐๐ 1 = 21 = (20.8)2 = 1.502 ๐บ ฬถ 1= ๐๐๐ ๐1 52 = = 2.5 ๐บ ๐ผ1 20.8 2 2 2 ๐๐๐ 1 = √๐ 2ฬถ ๐๐ 1 − ๐ ๐๐ 1 = √(2.5) − (1.502) = 1.998 ๐บ ฬถ ๐ฬ๐๐ 1 = ๐ ๐๐ 1 + ๐๐๐๐ 1 = 1.502 + ๐1.998 = 2.5∠53.07° ๐บ 28 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (c) 3.13 Using voltage division: ๐ธฬ 1 = (2400∠0°) ๐800 = 2398.5 V ๐(800 + 0.5) ๐2 = ๐ธฬ 2 = ๐2 ๐ธฬ = 239.85 V ๐1 1 3.14 (a) 3 ๐ 50×10 ๐ผฬ2 = 2๐ ∠ − ๐๐๐ −1 (๐. ๐น. ) = 240 ∠ − ๐๐๐ −1 (0.8) = 208.3∠ − 36.87°๐ด 2 I1 = N2 1 I 2 = ( 208.3๏ − 36.87๏ฐ ) = 20.83๏ − 36.87๏ฐ A N1 10 E1 = N1 V2 = 10 ( 240๏0๏ฐ ) = 2400๏0๏ฐ V N2 ๐ฬ1 = 2400∠0° + (1 + ๐2.5)(20.83∠ − V1 = E1 + ( Reg1 + jX eg1 ) I1 36.87°) = 2400 + 56.095∠31.329° = 2447.9 + ๐29.166 = 2448.1∠0.683°๐ 29 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (b) ๐ฬ๐ = ๐ธฬ1 + (๐ ๐๐๐๐ + ๐๐๐๐๐๐ + ๐ ๐๐1 + ๐๐๐๐1 )๐ผฬ1 = 2400∠0° + (2.0 + ๐4.5)(20.83∠ − 36.87°) = 2400 + 102.59∠29.168° = 2489.6 + ๐50.00 = 2490.1∠1.1505°๐ (c) ๐ฬ๐ = ๐ฬ๐ ๐ผฬ๐∗ = (2490∠1.1505°)(20.83∠36.87°) = 51868. ∠38.05° PS = Re ( SS ) = 40.87 kW ๏ผ๏ฏ ๏ฝ delivered to the sending end of feeder. QS = I m ( SS ) = 31.95 kVARS๏ฏ๏พ 3.15 (a) ๐ผฬ1 = 20.83∠0° V1 = 2400๏0๏ฐ + (1 + j 2.5 )( 20.83๏0๏ฐ ) = 2400 + 56.095๏68.199๏ฐ = 2420.8 + j 52.08 = 2421.๏1.232๏ฐ V ( ) VS = 2400๏0๏ฐ + 2.0 + 4.5 ( 20.83๏0๏ฐ ) = 2400 + 102.59๏66.04๏ฐ = 2441.7 + j 93.74 = 2443.๏2.199๏ฐ V ๐ฬ๐ = ๐ฬ๐ ๐ผฬ๐∗ = (2443∠2.199°)(20.83∠0°) = 50896. ∠2.199° = 50,859. +๐1953. PS = 50.87 kW ๏ผ ๏ฝ delivered QS = 1.953kVARS๏พ (b) I1 = 20.83๏36.87๏ฐ A V1 = 2400๏0๏ฐ + (1 + j 2.5 )( 20.83๏36.87๏ฐ ) = 2400 + 56.095๏105.07๏ฐ = 2385.4 + j 54.17 = 2386๏1.301๏ฐ V VS = 2400๏0๏ฐ + ( 2.0 + j 4.5)( 20.83๏36.87๏ฐ ) = 2400 + 102.59๏102.91๏ฐ = 2377.1 + j100.0 = 2379.๏2.409๏ฐ V ๐ฬ๐ = ๐ฬ๐ ๐ผฬ๐∗ = (2379. ∠2.409°)(20.83∠ − 36.87°) = 49,566. ∠ − 34.46° = 40868. −๐28047. PS = 40.87 kW delivered QS = −28.05 kVARS delivered by source to feeder = +28.04 kVARS absorbed by source 30 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Note: Real and reactive losses, 0.87 kW and 1.95 kVARS, absorbed by the feeder and transformer, are the same in all cases. Highest efficiency occurs for unity P.F ( EFF = Pout / Ps × 100 = ( 50 / 50.87 ) ×100 = 98.29% ). 3.16 (a) ๐ = 2400/240 = 10 2400 2 ๐ 2′ = ๐2 ๐ 2 = ( 240 ) 0.0075 = 0.75 ๐บ ๐2′ = ๐2 ๐2 = (10)2 0.01 = 1.0 ๐บ Referred to the HV-side, the exciting branch conductance and susceptance are given by (1/ a2 ) 0.003 = (1/100 ) 0.003 = 0.03 ๏ด 10−3 S and (1/ a2 ) 0.02 = (1/100 ) 0.02 = 0.2 ๏ด 10−3 S The equivalent circuit referred to the high-voltage side is shown below: (b) ๐ 1′ = ๐ 1 /๐2 = 0.0075๐บ ๐1′ = ๐1 /๐2 = 0.01๐บ The equivalent circuit referred to the low-voltage side is shown below: 3.17 (a) Neglecting the exciting current of the transformer, the equivalent circuit of the transformer, referred to the high-voltage (primary) side is shown below: The rated (full) load current, Ref. to HV-side, is given by ( 50 ๏ด 103 ) 2400 = 20.8A 31 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. With a lagging power factor of 0.8, I1 = 20.8๏ − cos−1 0.8 = 20.8๏ − 36.9๏ฐ A Using KVL, V1 = 2400๏0๏ฐ + ( 20.8๏ − 36.9๏ฐ )(1.5 + j 2 ) = 2450๏0.34๏ฐ V (b) The corresponding phasor diagram is shown below: (c) Using KVL, VS = 2400๏0๏ฐ + ( 20.8๏ − 36.9๏ฐ )( 2 + j 4 ) = 2483.5๏0.96๏ฐ V pf at the sending end is cos ( 36.9๏ฐ + 0.96๏ฐ ) = 0.79 Lagging 3.18 ๐๐๐๐ ๐ = 50 kVA, ๐๐๐๐ ๐1 = 2400 V, ๐๐๐๐ ๐2 = 240 V, ๐๐๐๐ ๐1 = (2400)2 = 115.2 Ω 50 × 103 Using voltage division ๐ฬ 2๐๐ข = (1.0∠0°) ๐6.944 = 0.99938 ๐(6.944 + 4.3402 × 10−3 ) ๐ฬ 2 = ๐ฬ 2๐๐ข ๐๐๐๐ ๐2 = (0.99938)(240) = 239.85∠0°V 32 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 3.19 Zone 1 Zone 2 Sbase = 50 kVA VBase 2 = 240 V Vbase1 = 2400 V Z base1 = ( 2400 ) 50 ๏ด 103 2 = 115.2 ๏ (a) ๐ฬ1๐๐ข = 1.0∠0° + (8.6803 × 10−3 + ๐2.1701 × 10−2 )(1.0∠ − 36.87°) = 1.0 + 0.023373๏31.33๏ฐ = 1.01997 + j 0.012157 = 1.020๏0.683๏ฐ pu V1 = V1 puVbase = (1.020๏0.683๏ฐ )( 2400 ) = 2448.๏0.683๏ฐ V (b) ๐ฬ๐ ๐๐ข = 1.0∠0° + (1.7361 × 10−2 + ๐3.9063 × 10−2 )(1.0∠ − 36.87°) = 1.0 + 0.042747๏29.168๏ฐ = 1.03733 + j 0.020833 = 1.037 S๏1.1505๏ฐ pu VS = VspuVbase1 = (1.0375๏1.1505๏ฐ )( 2400 ) = 2490.๏1.1505๏ฐ V (c) ๐๐ ๐๐ข + ๐๐๐ ๐๐ข = ๐ฬ๐ ๐๐ข ๐ผฬ∗ ๐ ๐๐ข = (1.0375∠1.1505°)(1.0∠36.87°) = 1.0375๏38.02๏ฐ = 0.8173 + j 0.6390 per unit PS = ( 0.8173 )( 50 ) = 40.87 kW ๏ผ๏ฏ ๏ฝ delivered QS = ( 0.6390 )( 50 ) = 31.95 kVARS๏ฏ๏พ 3.20 Zone 1 ๏ฆ 240 ๏ถ Vbase1 = ๏ง ๏ท 460 ๏จ 480 ๏ธ = 230 V Zone 2 Zone 3 ๏ฆ 460 ๏ถ Vbase 2 = ๏ง ๏ท115 = 460 V ๏จ 115 ๏ธ ( 460 ) = 10.58 ๏ = 2 Z base 2 20,000 Vbase3 = 115V (115) = 0.6613 ๏ = 2 Z base3 20,000 20,000 I base3 = = 173.9 A 115 33 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 0.9+๐0.2 ฬถ ๐ฬ๐ฟ๐๐๐ = 1.361 + ๐0.3025 ๐๐ข = 0.6613 XT 2 pu = 0.10 pu 2 = 0.1890 pu 10.58 X Line pu = 2 ๏ฆ 480 ๏ถ ๏ฆ 20 ๏ถ XT 1 pu = ( 0.10 ) ๏ง ๏ท ๏ง ๏ท = 0.07259 pu ๏จ 460 ๏ธ ๏จ 30 ๏ธ 220 = 0.9565 pu 230 Vspu = I Load pu = Vspu j ( XT 1 pu + XT 2 pu + X Line ) + Z Load pu = 0.9565๏0๏ฐ j (.07259 + .1890 + .10 ) + (1.361 + j.3025) = 0.9565๏0๏ฐ 0.9565๏0๏ฐ = 1.361 + j 0.6641 1.514๏26.010 = 0.6316๏ − 26.01๏ฐ pu I Load = I Load pu I base3 = ( 0.6316๏ − 26.01๏ฐ )(173.9 ) = 109.8๏ − 26.01๏ฐ A 3.21 ( 600 ) Z base = 2 100 ๏ด 10 = 3.6 ๏ 3 I base = Z L pu = 1๏85๏ฐ = 0.2778๏85๏ฐ pu 3.6 ZY pu = 10๏40๏ฐ = 2.778๏40๏ฐ pu 3.6 Ea pu = 480 3 600 3 ๐ฟ๐๐ข 3 ( 600 ) = 96.23A ๏ − 30๏ฐ = 0.8๏ − 30๏ฐ pu ฬ ๐ธ ๐ผฬ๐๐๐ข = ๐ฬ ฬถ ๐๐๐ข +๐ฬ ฬถ 100 ๏ด 103 ๐๐๐ข 0.8∠−30° = 0.2778∠85°+2.778∠40° 0.8∠−30° 0.8∠−30° ๐ผฬ๐๐๐ข = 2.1521+๐2.0622 = 2.9807∠43.78° 34 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. I a pu = 0.2684๏ − 73.78๏ฐ pu ๐ผฬ๐ = ๐ผฬ๐๐๐ข ๐ผ๐๐๐ ๐ = (0.2684∠ − 73.78°)(96.23) I a = 25.83๏ − 73.78๏ฐ A 3.22 Per-unit positive-sequence circuit (2772 ) ฬถ ๐๐๐๐ ๐ = 10,000 = 7.673 ๐บ ZY 1pu = ( 20 + j10 ) 7.673 = ( 2.607 + j1.303) pu = 2.914๏26.57๏ฐ pu Z๏1 pu = ( 30 − j15) 3(7.673) = (1.303 − j 0.6516 ) pu = 1.437๏ − 26.57๏ฐ pu I1 pu = VS1 pu 1.0 ๏0๏ฐ = ๏ฉ ( 2.914 ๏26.57๏ฐ )(1.457 ๏ − 26.57๏ฐ ) ๏น ๏ช ๏บ ๏ช๏ซ ( 2.607 + j1.303 ) + (1.303 − j 0.6516 ) ๏บ๏ป 1.0 ๏0๏ฐ 1.0 ๏0๏ฐ = = = 0.9337 ๏9.463๏ฐpu ๏ฆ 4.246 ๏0๏ฐ ๏ถ 1.071๏ − 9.463๏ฐ ๏ง ๏ท ๏จ 3.91 + j 0.6517 ๏ธ ZY 1 pu Z ๏1 pu I base = 1000 277 = 36.1 A I1 = I1 pu I base = ( 0.9337๏9.463๏ฐ ) (36.1) = 33.71 ๏9.463๏ฐ A 3.23 Select a common base of 100MVA and 22kV on the generator side; Base voltage at bus 1 is 22kV; this fixes the voltage bases for the remaining buses in accordance with the transformer turns ratios. Using Eq. 3.3.11, per-unit reactances on the selected base are given by 100 100 ) = 0.2; ๐1 : ๐ = 0.1 ( ) = 0.2 90 50 ๐บ: ๐ = 0.18 ( 100 100 ๐2 : ๐ = 0.06 ( 40 ) = 0.15; ๐2 : ๐ = 0.06 ( 40 ) = 0.15 100 100 ) = 0.16; ๐4 : ๐ = 0.08 ( ) = 0.2 40 40 ๐3 : ๐ = 0.064 ( 100 10.45 2 ๐: ๐ = 0.185 (66.5) ( 11 ) = 0.25 (220)2 ฬถ For Line 1, ๐๐ต๐ด๐๐ธ = 100 (110)2 ฬถ For Line 2, ๐๐ต๐ด๐๐ธ = 100 48.4 = 484 ๐บ and ๐ = 484 = 0.1 65.43 = 121 ๐บ and ๐ = 121 = 0.54 35 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. The load complex power at 0.6 Lagging pf is SL (3๏ฆ ) = 57๏53.13๏ฐ MVA ๏ The load impedance in OHMS is Z L = (10.45) 2 57๏ − 53.13๏ฐ = VLL2 SL*(3๏ฆ ) = 1.1495 + ๐1.53267 ๐บ The base impedance for the load is ๏ Load Impedance in pu = (11)2 100 = 1.21 ๐บ 1.1495 + j1.53267 = 0.95 + j1.2667 1.21 The per-unit equivalent circuit is shown below: 3.24 ๐ 75 ๐V ๐๐ฟ 30 Ω (a) ๐๐ = 5 ∗ ๐๐ = 75 kV. ๐ผ๐ = 5 ∗ ๐ผ๐ฟ = 5 ∗ ( ๐ฟ ) = 5 ∗ (c) ๐๐๐ข = 15 kV 15 kV = 1.0, ๐๐๐ข = 30Ω 56.3Ω = 12.5 ๐A. ๐๐ฟ = ๐๐ผ = Primary Secondary ๐๐ 100 MVA 100 MVA ๐๐ 15 kV 75 kV ๐ผ๐ 6667 A 1333 A ๐๐ 2.25 Ω 56.3 Ω = 0.533, ๐ผ๐๐ข = 1 0.533 (75 kV)2 30Ω = 187 MW (๐) = 1.87, ๐๐๐ข = 1.87. ๐ผ๐ = ๐ผ๐๐ข ∗ ๐ผ๐,๐๐๐๐ = 12.5 kA. ๐๐ฟ = ๐๐๐ข ∗ ๐๐ = 187 MW 36 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 3.25 3 2 (69×10 ) Base impedance in circuit ๐ ฬถ = 15×106 = 317.4 ๐บ 500 Pre-unit impedance of load in circuit ๐ ฬถ = 317.4 = 1.575 The impedance diagram in PU is shown below: 3.26 Base impedance on the low-voltage, 3.81kV-side is (3.81)2 = 0.1613 ๐บ 90 Note: The rating of the transformer as a 3-phase bank is 3 ๏ด 30 = 90 MVA, 3 ( 38.1) : 3.81 = 66 : 3 . 81kV ๏ Y With a base of 66kV on the H-V side, base on L.V side = 3.81 kV so, on L.V. side RL = 66 1 = 6.2 pu 0.1613 2 Resistance referred to H.V. side = 1 (3.81) = 300 ๐บ Per-unit value should be the same as 6.2 pu. Check: base impedance on H.V. side = (66)2 90 = 48.4 ๐บ and 300 = 6.2pu 48.4 37 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 3.27 Transformer reactance on its own base is 0.4 = 0.828 pu (222 )/1000 220 2 100 On the chosen base, reactance becomes 0.828 ∗ (230) (1000) = 0.076 3.28 Eq. 3.3.11 of the text applies. 2 ๏ฆ 2400 ๏ถ ๏ฆ 100 ๏ถ G1 : Z = j 0.2 ๏ง ๏ท ๏ง ๏ท = j 2 pu ๏จ 2400 ๏ธ ๏จ 10 ๏ธ 2 ๏ฆ 2400 ๏ถ ๏ฆ 100 ๏ถ G2 : Z = j 0.2 ๏ง ๏ท ๏ง ๏ท = j1pu ๏จ 2400 ๏ธ ๏จ 20 ๏ธ 2 ๏ฆ 2400 ๏ถ ๏ฆ 100 ๏ถ T1 : Z = j 0.1๏ง ๏ท ๏ง ๏ท = j 0.25pu ๏จ 2400 ๏ธ ๏จ 40 ๏ธ 2 ๏ฆ 10 ๏ถ ๏ฆ 100 ๏ถ T2 : Z = j 0.1๏ง ๏ท ๏ง ๏ท = j 0.136 pu ๏จ 9.6 ๏ธ ๏จ 80 ๏ธ For the transmission-line zone, base impedance = ๏ Z LINE = ( 50 + j 200 ) M ; kV A = (9600)2 100×103 100 ๏ด 103 ( 9600 ) 2 = ( 0.054 + j 0.217 ) pu 25 4 = 0.25pu; 4 kV = = 0.833pu 100 4.8 The impedance diagram for the system is shown below: 3.29 Since ๐ฬ๐′ ๐′ = ๐๐ฬ๐๐ = ๐(๐ฬ๐๐ − ๐ฬ๐๐ ) ๐ฬ๐′ ๐′ = (√3๐๐ ๐30° )๐ฬ๐๐ = ๐ถฬ1 ๐ฬ๐๐ } ๐ฬ๐′ ๐′ = ๐ถฬ1 ๐ฬ๐๐ ; ๐ฬ๐ ′๐′ = ๐ถฬ1 ๐ฬ๐๐ ← (a) Yes ← (b) Since ๐ผฬ๐ = ๐ผฬ๐๐ − ๐ผฬ๐๐ = ๐(๐ผฬ๐′ − ๐ผฬ๐′ ) ๐ผฬ๐ = (√3๐๐ −๐30° )๐ผฬ๐′ = ๐ถฬ1∗ ๐ผฬ๐′ ; ๐ผฬ๐′ = ๐ผฬ๐ /๐ถฬ1∗ }← ๐ผฬ๐′ = ๐ผฬ๐ /๐ถฬ1∗ ; ๐ผฬ๐′ = ๐ผฬ๐ /๐ถฬ1∗ ∗ (c) ๐ฬ ′ = ๐ฬ๐′๐′ (๐ผฬ๐′ ) = ๐ถฬ1 ๐ฬ๐๐ (๐ผฬ๐ /๐ถฬ1∗ )∗ = ๐ฬ๐๐ ๐ผฬ๐∗ = ๐ฬ ← 38 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 3.30 For a negative sequence set, Va๏ขn๏ข = ( 3n e )V = C V = C V ๏ผ๏ฏ − j 30๏ฐ an * 1 an 2 an Vb๏ขn๏ข = C2Vbn ;Vc๏ขn๏ข = C2Vcn where C2 = C1* ๏ฏ๏ฏ ๏ฝ ๏ฌ ๏ฏ I a = C2* I a๏ข or I a๏ข = I a / C2* ๏ฏ * * * I b๏ข = I b / C2 ; I c๏ข = I c / C2 where C2 = C1 ๏ฏ๏พ (a) ๏ฏ๏ผ ๏ฝ๏ฌ Also C1 = C2* ; Note:Taking the complex conjugate ๏ฏ๏พ C1 = 3 n e j 30๏ฐ ; C2 = 3 n e − j 30๏ฐ = C1* Transforms a positive sequence set into a negative sequence set. 3.31 ๏ผ ๏ฆ n j 30๏ฐ ๏ถ Va๏ขn๏ข = ๏ง e ๏ท Van = C3Van ๏ฏ For the positive seq. set ๏จ 3 ๏ธ ๏ฝ Vb๏ขn๏ข = C3 Vbn ; Vc๏ขn๏ข = C3Vcn ๏ฏ๏พ (a) ๐ถฬ4 = ๐ถฬ3∗ for the negative sequence set (b) Complex power gain = C (1 C * ) = 1 * (c) Z L = Van Va๏ขn๏ข / C 1 = * = 2 Z L ,where C = C . ๏ข Ia C Ia C 3.32 (a) For positive sequence, ๐ฬ๐ป1 leads ๐ฬ๐1 by 90๏ฐ, and ๐ฬ๐ป1 lags ๐ฬ๐1 by 90๏ฐ. For negative sequence, ๐ฬ๐ป2 lags ๐ฬ๐2 by 90๏ฐ, and ๐ฬ๐ป2 leads ๐ฬ๐2 by 90๏ฐ. 39 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (b) For positive sequence ๐ฬ๐ป1 leads ๐ฬ๐1 by 90๏ฐ and ๐ฬ๐1 is in phase with ๐ฬ๐1. For negative sequence ๐ฬ๐ป2 lags ๐ฬ๐2 by 90๏ฐ and ๐ฬ๐2 is in phase with ๐ฬ๐2. Note that a ๏ – zig๏ฏzag transformer can be used to obtain the advantages of a ๐ฅ − ๐ transformer without phase shift. (c) For positive sequence, ๐ฬ๐ป1 lags ๐ฬ๐1 by 23.4๏ฐ. For negative sequence, ๐ฬ๐ป2 leads ๐ฬ๐2 by 23.4๏ฐ. 40 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 3.33 3.34 (a) (b) 3.35 Secondary side: ๐๐ = 50 ∠(18° − 30°) = 28.9∠ − 12°; ๐๐ = 28.9∠108°; ๐๐ = 28.9∠ − 132° then √3 230 primary side must lead secondary by 30°. ๐๐ = 28.9 ∗ 46 ∠(108° + 30°) = 144.5∠138°; ๐๐ = 144.5∠18°; ๐๐ = 144.5∠ − 102°. 41 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 3.36 Open ๏ Transformer (a) ๐ฬ๐๐ and ๐ฬ๐๐ remain the same after one, single-phase transformer is removed. Therefore, ๐ฬ๐๐ = −(๐ฬ๐๐ + ๐ฬ๐๐ ) remains the same. The load voltages are then balanced, Positive-sequence. Selecting ๐ฬ๐๐ as reference: Van = 13.8 3 ๏0๏ฐ = 7.967 ๏0๏ฐ kV Vbn = 7.967 ๏ − 120๏ฐ kV Vcn = 7.967๏ + 120๏ฐ kV (b) I a = S3๏ฆ 3VLL ๏0๏ฐ = 43.3 ๏ด 106 3 (13.8 ๏ด 103 ) = 1.812๏0๏ฐ kA I b = 1.812๏ − 120๏ฐ kA I c = 1.812๏ + 120๏ฐ kA (c) Vbc = 13.8๏ − 120๏ฐ + 30๏ฐ = 13.8๏ − 90๏ฐ kV Transformer bc delivers ๐ฬ๐๐ = ๐ฬ๐๐ ๐ผฬ๐∗ Sbc = (13.8๏ − 90๏ฐ)(1.812๏ + 120๏ฐ) = 25 ๏ ๏30๏ฐ MVA ๐ฬ๐๐ = (21.65 + ๐12.5) × 106 Transformer ac delivers ๐ฬ๐๐ = ๐ฬ๐๐ ๐ผฬ๐∗ where Vac = −Vca = −13.8๏120๏ฐ + 30๏ฐ = 13.8๏ − 30๏ฐ kV Sac = (13.8๏ − 30๏ฐ )(1.812๏0๏ฐ ) = 25 ๏ ๏ − 30๏ฐ MVA ๐ฬ๐๐ = (21.65 − ๐12.5) × 106 The open-๏ transformer is not overloaded. Note that transformer bc delivers 12.5 Mvars and transformer ac absorbs 12.5 Mvars. The total reactive power delivered by the open-๏ transformer to the resistive load is therefore zero. 42 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 3.37 Noting that √3(54.2) = 94, the rating of the 3-phase transformer bank is 75 MVA, 94Y๏ฏ5.42 ๏ kV. Base impedance for the low-voltage side is 5.422 = 0.3917๐บ 75 0.6 On the low-voltage side, ๐ ๐ฟ = 0.3917 = 1.53๐๐ข Base impedance on high-voltage side is (94)2 94 75 = 117.8๐บ 2 The resistance ref. to HV-side is 0.6 (5.42) = 180๐บ 180 or ๐ ๐ฟ = 117.8 = 1.5๐๐ข 3.38 (a) The single-line diagram and the per-phase equivalent circuit, with all parameters in per unit, are given below: Current supplied to the load is 240 ๏ด 103 3 ๏ด 230 Base current at the load is 100,000 = 602.45A ( 3 ๏ด 230 ) = 251.02 A The power-factor angle of the load current is ๏ฑ = cos−1 0.9 = 25.84๏ฐ Lag . With ๐ฬ๐ด = 1.0∠0° as reference, the line currents drawn by the load are IA = 602.45 ๏ − 25.84๏ฐ = 2.4๏ − 25.84๏ฐ per unit 251.02 I B = 2.4๏ − 25.84๏ฐ − 120๏ฐ = 2.4๏ − 145.84๏ฐ per unit I C = 2.4๏ − 25.84๏ฐ + 120๏ฐ = 2.4๏94.16๏ฐ per unit (b) Low-voltage side currents further lag by 30° because of phase shift ๐ผฬ๐ = 2.4∠ − 55.84°; ๐ผฬ๐ = 2.4∠ − 175.84°; ๐ผฬ๐ = 2.4∠64.16° (c) The transformer reactance modified for the chosen base is X = 0.11 ๏ด (100 / 330 ) = 1 pu 30 43 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. The terminal voltage of the generator is then given by Vt = VA ๏ − 30๏ฐ + jXI a = 1.0๏ − 30๏ฐ + j (1/ 30 )( 2.4๏ − 55.34๏ฐ ) = 0.9322 − j 0.4551 = 1.0374 ๏ − 26.02๏ฐ pu Terminal voltage of the generator is 23 ๏ด 1.0374 = 23.86 kV The real power supplied by the generator is Re ๏ฉ๏ซVt I a* ๏น๏ป = 1.0374 ๏ด 2.4cos ( −26.02๏ฐ + 55.84๏ฐ ) = 2.16 pu which corresponds to 216 MW absorbed by the load, since there are no ๐ผ 2 ๐ losses. (d) By omitting the phase shift of the transformer altogether, recalculating ๐ฬ๐ก with the reactance 1 ๐ (30) on the high-voltage side, the student will find the same value for ๐๐ก i.e. |๐ฬ๐ก |. 3.39 Zero Sequence Positive Sequence Negative Sequence 44 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 2 3.40 ๏ฆ 230 ๏ถ ๏ฆ 100 ๏ถ X pu new = 0.06 ๏ง ๏ท ๏ง ๏ท = 0.01837 pu ๏จ 240 ๏ธ ๏จ 300 ๏ธ Zero Sequence Positive Sequence Negative Sequence 3.41 Per-unit positive-sequence reactance diagram 45 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Sbase = 100 MVA Vbase H = 500 kV in transmission-line Zones Vbase X = 20 kV in motor๏ฏgenerator Zones 2 ๏ฆ 18 ๏ถ X g๏ข๏ข1 = X g๏ข๏ข2 = 0.2 ๏ง ๏ท = 0.162 pu ๏จ 20 ๏ธ ๏ฆ 1000 ๏ถ X m๏ข๏ข 3 = 0.2 ๏ง ๏ท = 0.1333pu ๏จ 1500 ๏ธ XT 1 = XT 2 = XT 3 = XT 4 = 0.1pu ๏ฆ 1000 ๏ถ XTS = 0.1๏ง ๏ท = 0.06667 pu ๏จ 1500 ๏ธ Z base H = ( 500 ) 1000 = 250 ๏ 2 Xline 50 = 50 / 250 = 0.2 pu Xline 25 = 25 / 250 = 0.1pu 3.42 18 ๏0๏ฐ = 0.9๏0๏ฐ pu 20 1500 I3 = ๏ cos−1 0.8 = 60.14๏36.87๏ฐ kA 3 (18 )( 0.8 ) V3 pu = I base X = 1000 = 28.87 kA 20 3 60.14 I3 = ๏36.87๏ฐ = 2.083 ๏36.87๏ฐ pu 28.87 1 V1 = V2 = V3 + I 3 ( j ๏ดT 5 ) + I 3 ( jX Line 25 + jXT 3 ) 2 ๏ฉ ๏ฆ 0.1 + 0.1 ๏ถ ๏น = 0.9๏0๏ฐ + ( 2.083 ๏36.87๏ฐ ) ๏ช j ๏ง 0.06667 + ๏ท๏บ 2 ๏ธ๏ป ๏ซ ๏จ = 0.7454 ๏21.88๏ฐpu V1 = V2 = 0.7454 ( 20 ) = 14.91 kV 46 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 3.43 Sbase = 30 MVA Vbase H = 66.4 3 = 115kV I H1 = I X1 = (a) I base H = 1.0๏0๏ฐ = 10.0๏ − 90๏ฐ pu j 0.1 30 115 3 I base X = = 0.1506 kA Vbase X = 12.5 3 = 21.65 kV 30 = 0.8kA 21.65 3 I H = 10 ( 0.1506 ) = 1.506 kA I X = 10 ( 0.8 ) = 8kA (b) I base H = 0.1506 kA; Vbase X = 12.5kV; 30 = 1.386 kA 12.5 3 I H = 1.506 kA; I base X = I X = 10 (1.386 ) = 13.86 kA 3.44 Sbase = 135MVA VBase H = 115kV Vbase X = 13.2kV ๏ฆ 135 ๏ถ (a) X g1 = 1.5 ๏ง ๏ท = 1.558 pu ๏จ 130 ๏ธ (b) 47 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (c) I base H = 135 115 3 = 0.6778kA; I H = 15๏0๏ฐ (115 3 ) (1.0) = 0.0753๏0๏ฐ kA = 0.1111๏0๏ฐpu VX = 1๏0๏ฐ + ( 0.005 + j 0.1)( 0.1111๏0๏ฐ ) = 1.0021 + j 0.04286 = 1.003๏2.45๏ฐ pu; VX = 1.003(13.2) = 13.24 kV Eg = 1๏0๏ฐ + ( 0.005 + j1.85 )( 0.4286๏0๏ฐ ) = 1.961๏23.86๏ฐ pu; Eg = 1.961 ๏ด 13.2 = 25.89 kV Px + jQx = Vx I x* = (1.003๏2.45๏ฐ )( 0.4286๏0๏ฐ ) = 0.4299๏2.45๏ฐ pu = 0.4299 ( 35 ) ๏2.45๏ฐ MVA = 15.03MW + j 0.643MVAR PF = cos 2.45๏ฐ = 0.999 Lagging 3.45 Three-phase rating of transformer T2 is 3 ๏ด 100 = 300 MVA and its line-to-line voltage ratio is √3(127): 13.2 or 220 :13.2 kV . Choosing a common base of 300 MVA for the system, and selecting a base of 20 kV in the generator circuit, The voltage base in the transmission line is 230 kV and the voltage base in the motor circuit is 230 (13.2๏ฏ220) = 13.8 kV transformer reactances converted to the proper base are given by 300 13.2 2 ๐1 : ๐ = 0.1 × = 0.0857; ๐2 : 0.1 ( ) = 0.0915 350 13.8 Base impedance for the transmission line is (230)2๏ฏ300=176.3 ๏ The reactance of the line in per unit is then 0.5×64 = 0.1815 176.3 300 13.2 2 300 13.2 2 Reactance ๐๐ผ″ of motor ๐1 : 0.2 (200) (13.8) = 0.2745 Reactance ๐๐ผ″ of motor ๐2 : 0.2 (100) (13.8) = 0.549 Neglecting transformer phase shifts, the positive-sequence reactance diagram is shown in figure below: 48 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 3.46 The motors together draw 180 MW, or 180 = 0.6 pu 300 With phase-a voltage at the motor terminals as reference, V= 13.2 = 0.9565๏0๏ฐ pu 13.8 The motor current is given by I = 0.6 ๏0๏ฐ = 0.6273๏0๏ฐ pu 0.9565 Referring to the reactance diagram in the solution of Problem 3.33, phase-a per-unit voltages at other points of the system are At m : V = 0.9565 + 0.6273 ( j 0.0915) = 0.9582 ๏3.434๏ฐ pu At l : V = 0.9565 + 0.6273 ( j 0.0915 + j 0.1815) = 0.9717๏10.154๏ฐ pu At k : V = 0.9565 + 0.6273 ( j 0.0915 + j 0.1815 + j 00857 ) = 0.9826๏13.237๏ฐ pu The voltage regulation of the line is then 0.9826 − 0.9582 = 0.0255 0.9582 The magnitude of the voltage at the generator terminals is 0.9826 ๏ด 20 = 19.652 kV Note that the transformer phase shifts have been neglected here. 3.47 (a) For positive sequence operation and standard ๏-Y connection, the per-phase diagram is shown below: Va๏ขn๏ข = 230 3 ๏0๏ฐ kV, choosing that as a reference. 49 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 100 ๏ด 106 ๏ cos−1 0.8 = 41.67๏36.87๏ฐ MVA 0.8 ๏ด 3 S ๏ข 41.67 ๏ด 106 ๏36.87๏ฐ I a๏ข * = = = 313.8๏36.87๏ฐ A Va๏ขn๏ข 132.8 ๏ด 103 S๏ข = ๏ I a๏ข = 313.8๏ − 36.87๏ฐ A I a = 10 3 e − j 30๏ฐ I a๏ข = 5435๏ − 66.87๏ฐ A The primary current magnitude is 5435A. ๏ฌ ๏ฆ 1 ๏ถ Van = V + j 0.08I a = ๏ง 132.8 ๏ด 103 ๏ − 30๏ฐ ๏ท + j 0.08 ( 5435๏ − 66.87๏ฐ ) ๏จ 10 3 ๏ธ = 7667.4๏ − 30๏ฐ + 434.8๏23.13๏ฐ = 7936๏ − 27.45๏ฐ V Line-to-line primary voltage magnitude = 3 ( 7936 ) = 13.75kV ๏ฌ Three-phase complex power supplied by the generator is S3๏ฆ = 3Van I a* = 3 ( 7396๏ − 27.45๏ฐ )( 5435๏66.87๏ฐ ) =129๏39.4๏ฐ MVA ๏ฌ (b) The secondary phase leads the primary by 27.45๏ฐ; this phase shift applies to line-to-neutral (phase) as well as line-to-line voltages. ๏ฌ 3.48 (a) For positive sequence operation and standard ๏-Y & Y-๏ connections, the per-phase diagram is drawn below: (b) V1 = 15 3 ๏0๏ฐ kV, choosing that as a reference. ๐ฬ 3ฬถ = (5 + ๐1) + ๐0.08 = (5 + ๐1.08)๐บ 2 ๐ฬ2ฬถ = ๐100 + (10√3) ๐ฬ3ฬถ = (1500 + ๐424)๐บ ๐ฬ1ฬถ = [ ๐ฬ2ฬถ 2 ] + ๐0.08 = 5 + ๐1.4933 = 5.22∠16.63° (10√3) ∴ ๐ผฬ1 = ๐ฬ1 /๐ฬ1ฬถ = 8660.5 = 1659.1∠ − 16.63° (5.22∠16.63°) 50 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Generator current magnitude = I1 = 1659.1 A ๏ฌ I2 = 1 10 3 e j 30๏ฐ I1 = 95.8๏13.37๏ฐ A Transmission-line current magnitude = 95.8 A ๏ฌ I3 = 10 3e− j 30๏ฐ I 2 = 1659.3๏ − 16.63๏ฐ A Load current magnitude = 1659.3 A ๏ฌ V3 = Z LOAD I 3 = ( 5 + j1)(1659.3๏ − 16.63๏ฐ ) = 8462.4๏ − 5.32๏ฐ V Line-to-line voltage magnitude at load terminals = 14.66 kV ๏ฌ Three-phase complex power delivered to the load is S3๏ฆ = 3V3 I 3* = 3 Z LOAD I 32 = 3 ( 8462.4๏ − 5.32๏ฐ )(1659.3๏ + 16.63๏ฐ ) = 42.125๏11.31๏ฐ MVA ๏ฌ 3.49 Base kV in transmission-line circuit = 132 kV Base kV in the generator G1 circuit = 132 ๏ด 13.2 = 10.56 kV 165 Base kV in the generator G2 circuit = 132 ๏ด 13.8 = 11.04 kV 165 Impedance diagram of the system with pu values 51 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. On the common base of 100 MVA for the entire system, 2 100 ๏ฆ 13.2 ๏ถ G1 : Z = j 0.15 ๏ด ๏ด = j 0.4688 pu 50 ๏ง๏จ 10.56 ๏ท๏ธ 2 G2 : Z = j 0.15 ๏ด 100 ๏ฆ 13.8 ๏ถ ๏ด = j1.1719 pu 20 ๏ง๏จ 11.04 ๏ท๏ธ 2 T1 : Z = j 0.1 ๏ด 100 ๏ฆ 13.2 ๏ถ ๏ด = j 0.1953pu 80 ๏ง๏จ 10.56 ๏ท๏ธ 2 100 ๏ฆ 13.8 ๏ถ T2 : Z = j 0.1 ๏ด ๏ด = j 0.3906 pu 40 ๏ง๏จ 11.04 ๏ท๏ธ Base impedance in transmission-line circuit is (132 ) = 174.24 ๏ 2 100 50 ๏ด j 200 = 0.287 + j1.1478 pu 174.24 25 ๏ด j100 ZTR. LINE 2 = = 0.1435 + j 0.5739 pu 174.24 ZTR. LINE 1 = LOAD : 40 ( 0.8 + j 0.6 ) = ( 32 + j 24 ) MVA (150 ) = 703.1๏ = 703.1 pu = 4.035pu = 2 RLOAD 32 174.24 (150 ) = 937.5 ๏ = 937.5 pu = 5.381pu 2 X LOAD = 24 Z LOAD = ( RLOAD 174.24 jX LOAD ) 3.50 52 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 3.51 (a) X12 = 0.08 pu; X13 = 0.1 pu; X 23 = 0.09 (15/10 ) = 0.135 pu 1 ( 0.08 + 0.1 − 0.135) = 0.0225 pu 2 1 X 2 = ( 0.08 + 0.135 − 0.1) = 0.0575 pu 2 1 X3 = ( 0.135 + 0.1 − 0.08 ) = 0.0775 pu 2 X1 = (b) Using ๐3๐ = 2 2 3๐๐ฟ๐ ๐๐ฟ๐ฟ = ๐ ๐ R2 = (13.2 ) 7.5 = 23.23 ๏; R3 = ( 2.3 ) 5 = 1.058 ๏ 2 2 Z 2 base = (13.2 ) 15 = 11.616 ๏; Z 3 base = ( 2.3 ) 15 = 0.3527 ๏ 2 R2 pu = R2 Z 2 base 2 23.23 1.058 = 2 pu; R3 pu = = 3pu 11.616 0.3527 3.52 Voltage ratings indicate the turns ratio. Tertiary voltage is 20 kV according to the turns ratio. Tertiary current is determined by ๐1 ๐ผ1 −๐2 ๐ผ2 138∗10−69∗18 = = 6.9 A ๐3 20 3.53 With a base of 15 MVA and 66 kV in the primary circuit, the base for secondary circuit is 15 MVA and 13.2 kV, and the base for tertiary circuit is 15 MVA and 2.3 kV, Note that XPS and XPT need not be changed. XST is modified to the new base as follows: ๐๐๐ = 0.05 × 15 = 0.075 10 With the bases specified, the per-unit reactances of the per-phase equivalent circuit are given by 1 ๐๐ = (๐0.09 + ๐0.08 − ๐0.075) = ๐0.0475 2 1 ๐๐ = (๐0.09 + ๐0.075 − ๐0.08) = ๐0.0425 2 53 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 1 ๐๐ = (๐0.08 + ๐0.075 − ๐0.09) = ๐0.0325 2 3.54 The constant voltage source is represented by a generator having no internal impedance. On a base of 5 MVA, 2.3 kV in the tertiary, the resistance of the load is 1.0 pu. Expressed on a 15 MVA, 2.3 kV base, the load resistance is R = 1.0 ๏ด 15 = 3.0 pu 5 On a base of 15 MVA, 13.2 kV, the reactance of the motor is X ๏ข๏ข = 0.2 ๏ด 15 = 0.4 pu 7.5 The impedance diagram is given below: Note that the phase shift that occurs between the Y-connected primary and the ๏-connected tertiary has been neglected here. 3.55 (a) (b) SX = ( 2300) ( 47.83) = 110kVA ๐๐ป = 2530 (43.48) 10 kVA is transformed by magnetic induction. 100 kVA is transformed electrically. (c) At rated voltage, core losses = 70 W 2 ๏ฆ 4.348 ๏ถ At full-load current, winding losses = ๏ง ๏ท 240 = 224W ๏จ 4.5 ๏ธ Total losses = PLoss = 294 W pout = ( 2530 ) ( 43.48 )( 0.8 ) = 88003W Pin = Pout + PLoss = 88003 + 294 = 88297 W 0 0 Efficiency = ( Pout Pin ) ๏ด 100 = ( 88003 88297 )100 = 99.67 0 0 54 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 3.56 (a) (b) As a normal, single-phase, two-winding transformer, rated: 3 kVA, 220๏ฏ110 V; 2 (220) ฬถ Xeq = 0.10 per unit.๐๐ต๐๐ ๐ ๐ป๐๐๐ = 3000 = 16.133๐บ As a single - phase autotransformer rated: 330 (13.64 ) = 4.50 kVA, 330 /110 V, Z Base H new = ( 330 ) / 4500 = 24.2 ๏ 2 ๏ฆ 16.133 ๏ถ X eq = ( 0.10 ) ๏ง ๏ท = 0.06667 per unit ๏จ 24.2 ๏ธ SBase 3๏ฆ = 13.5 kVA VBase X = 110 V VBase H = 479.5V I Base X = I Base H = 13.5 ๏ด 103 110 3 = 70.86 A 13.5 ๏ด 103 479.5 3 = 16.256 A IX = 6000๏ − cos−1 .8 (110 3 ) ( 0.8 ) = 39.36๏ − 36.87๏ฐ A 39.36 ๏ − 36.87๏ฐ = 0.5555๏ − 36.87๏ฐ per unit 70.86 I H = I X = 0.5555 per unit IX = I H = ( 0.5555 ) (16.256 ) = 9.031A VH = VX + jX eq I X = 1.0๏0๏ฐ + ( j 0.06667 ) (.5555๏ − 36.86๏ฐ ) VH = 1.0 + 0.03704๏53.13๏ฐ = 1.0222 + j 0.02963 VH = 1.0226๏1.66๏ฐ per unit VH = (1.0226 )( 479.5 ) = 490.3V 55 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 3.57 Rated currents of the two-winding transformer are I1 = 60,000 = 250 A 240 and I2 = 60,000 = 50 A 1200 The autotransformer connection is shown below: (a) The autotransformer secondary current is I L = 300 A With windings carrying rated currents, the autotransformer rating is (1200 )( 300 )10−3 = 360 kVA (b) Operated as a two-winding transformer at full-load, 0.8 pf, Efficiency๏จ = 60 ๏ด 0.8 = 0.96 ( 60 ๏ด 0.8 ) + pLoss From which the total transformer loss PLOSS = 48 (1 − 0.96 ) 0.96 = 2 kW The total autotransformer loss is same as the two-winding transformer, since the windings are subjected to the same rated voltages and currents as the two-winding transformer. ∴ ๐๐ด๐๐๐. ๐๐ . = 360 × 0.8 = 0.9931 (360 × 0.8) + 2 3.58 (a) The autotransformer connection is shown below: 56 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 90,000 90,000 = 1125A; I 2 = = 750 A 80 120 V1 = 80 kV; V2 = 120 + 80 = 200 kV I1 = I in = 1125 + 750 = 1875A (b) Input kVA is calculated as 80 ๏ด 1875 = 150,000 kVA which is same as Output kVA = 200 ๏ด 750 = 150,000 Permissible kVA rating of the autotransformer is 150,000. The kVA transferred by the magnetic induction is same as the rating of the two-winding transformer, which is 90,000 kVA. 3.59 ๏ช PLoad + jQLoad = V ๏ขI Load = (1.0๏0๏ฐ )(1.0๏ − 30๏ฐ ) = 1.0๏30๏ฐ = 0.866 + j 0.50 per unit ๏ช (a) No regulating transformer, ๐ถฬ = 1.0 Using current division: ๏ฆ XL 2 ๏ถ ๏ฆ 0.25 ๏ถ I L1 = ๏ง ๏ท I Load = ๏ง ๏ท (1.0๏ − 30๏ฐ ) = 0.5556๏ − 30๏ฐ per unit ๏จ 0.45 ๏ธ ๏จ X L1 + X L 2 ๏ธ PL1 + jQL1 = V ๏ขI L๏ช1 = 0.5556๏ + 30๏ฐ = 0.4811 + j 0.2778 per unit PL 2 + jQL 2 = ( PLoad + jQLoad ) − ( PL1 + jQL1 ) = ( 0.866 + j 0.5 ) − (.4811 + j.2778 ) = 0.3849 + j 0.2222 per unit 57 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (b) Voltage magnitude regulating transformer, C = 0.9524 Using the admittance parameters from Example 3.13(a) ๐ฬ ๐ผฬ ๐ผฬ [ ]=[ ฬ ] = [ 11 −๐ผ๐ฟ๐๐๐ −1.0∠ − 30° ๐ฬ21 −๐9.0 ๐8.810 ๐ฬ12 ๐ฬ ฬ ][ ] = [ ][ ๐ ] ฬ๐22 ๐ฬ 1 ๐8.810 −๐8.628 1.0∠0° Solving the second equation above for ๐ฬ: −1.0∠ − 30° = (๐8.810)๐ฬ − (๐8.628)(1.0∠0°) V= 8.628๏90๏ฐ − 1.0๏ − 30๏ฐ −.866 + j 9.128 = = 1.041๏5.42๏ฐ per unit j8.810 j8.810 Then: ฬ′ ฬ ๐ −๐ 1.041∠5.42°−1.0∠0° 0.0361+๐0.0983 ๐ผฬ๐ฟ1 = = = = 0.5235∠ − 20.14° ๐๐๐ฟ1 ๐0.20 ๐0.20 PL1 + jQL1 = V ๏ขI L๏ช1 = 0.5235๏20.14๏ฐ = 0.4915 + j 0.1802 per unit PL 2 + jQL 2 = ( PLoad + jQLoad ) − ( PL1 + jQL1 ) = 0.3745 + j 0.3198 per unit The voltage magnitude regulating transformer increases the reactive power delivered by line L-2 43.970 (from 0.2222 to 0.3198) with a relatively small change in the real power delivered by line L2. (c) Phase angle regulating transformer, ๐ถฬ = 1.0∠ − 3° Using ๐ฬ21 = −0.2093 + ๐8.9945 and ๐ฬ22 = −๐9.0 per unit from Example 3.13(b): V= = I L1 = −Y22V ๏ข − I Load ( j 9.0 )(1.0๏0๏ฐ ) − 1.0๏ − 30๏ฐ = Y21 −0.2093 + j8.9945 −0.8660 + j 9.50 9.539๏95.21๏ฐ = = 1.060๏3.89๏ฐ per unit −0.2093 + j8.9945 8.997๏91.33๏ฐ V − V ๏ข 1.060๏3.879๏ฐ − 1.0๏0๏ฐ 0.0578 + j 0.717 = = jX L1 j 0.20 j 0.20 = 0.4606๏ − 38.87๏ฐ per unit PL1 + jQL1 = V ๏ขI L๏ช1 = 0.4606๏ + 38.87๏ฐ = 0.3586 + j 0.2890 PL 2 + jQL 2 = ( PLoad + jQLoad ) − ( PL1 + jQL1 ) = 0.5074 + j 0.2110 The phase-angle regulating transformer increases the real power delivered by line L2 31.8% (from 0.3849 to 0.5074) with a relatively small change in the reactive power delivered by line L2. 58 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 3.60 Losses are minimum at 0 degrees = 16.606 MW (there can be a +/- 0.1 variation in this value values of the power flow solution tolerance). MW Losses -10 -9 -8 -7 -6 -5 -4 -3 -2 3.61 Minimum occurs at a tap of 1.0 = 16.604 (there can be a +/- 0.1 variation in this value values of the power flow solution tolerance). MW Losses 0.9 0.90625 0.9125 0.91875 0.925 0.93125 0.9375 0.94375 0.95 3.62 Using (3.8.1) and (3.8.2) ๐๐ก = 13.8 13.8 = 0.03636๐ = = 0.04 345(1.1) 345 ๐ = ๐๐ก /๐ = 0.03636/0.04 = 0.90909 From Figure 3.25(a): 59 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฆ 1 ๏ถ cYeq = ( 0.90909 ) ๏ง ๏ท = − j18.18 per unit ๏จ j 0.05 ๏ธ ๏ฆ 1 ๏ถ (1 − c ) Yeq = ( 0.0909 ) ๏ง ๏ท = − j1.818 per unit ๏จ j 0.05 ๏ธ 1 ๏ถ ( c − c )Y = ( 0.82645 − 0.90909) ๏ฆ๏ง๏จ j0.05 ๏ท = + j1.6529 per unit ๏ธ 2 eq The per-unit positive-sequence network is: 3.63 A radial line with tap-changing transformers at both ends is shown below: ๐ฬ1′ and ๐ฬ2′ are the supply phase voltage and the load phase voltage, respectively, referred to the high-voltage side. ๐ฬ๐ and ๐ฬ๐ are the phase voltages at both ends of the line. ๐ก๐ and ๐ก๐ are the tap settings in per unit. The impedance ๐ฬ ฬถ includes the line impedance plus the referred impedances of the sending end and the receiving end transformers to the high-voltage side. After drawing the voltage phasor diagram for the KVL ๐ฬ๐ = ๐ฬ๐ + (๐ + ๐๐)๐ผฬ, neglecting the phase shift between ๐ฬ๐ and ๐ฬ๐ as an approximation, and noting that ๐ฬ๐ = ๐ก๐ ๐ฬ1′ and ๐ฬ๐ = ๐ก๐ ๐ฬ2′ , it can be shown that |๐ฬ2′ | |๐ฬ1′ | ๐ก๐ = ๐ ๐๐ + ๐๐๐ 1− |๐ฬ1′ ||๐ฬ2′ | √ 60 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. where ๐๐ and ๐๐ are the load real and reactive powers per phase and it is assumed that ๐ก๐ ๐ก๐ = 1. In our problem, P๏ฆ = 1 (150 ๏ด 0.8 ) = 40 MW 3 and Q๏ฆ = 1 (150 ๏ด 0.6 ) = 30 MVAR 3 V1๏ข = V2๏ข = ๐ก๐ is calculated as tS = 230 3 kV 1 (18)( 40 ) + ( 60 )( 30 ) 1− ( 230 / 3 ) and tR = = 1.08pu 2 1 = 0.926 pu 1.08 3.64 With the tap setting t = 1.05, ๏V = t − 1 = 0.05pu The current setup by ๏V = 0.05๏0๏ฐ circulates around the loop with switch S open; with S closed, only a very small fraction of that current goes through the load impedance, because it is much larger than the transformer impedance; so the superposition principle can be applied to ๐ฅ๐ฬ and the source voltage. From ๐ฅ๐ฬ Alone, ๐ผ๐ถ๐ผ๐ ๐ถ = 0.05/๐0.2 = −๐0.25 With ๐ฅ๐ฬ shorted, the current in each path is one-half the load current. Load current is 1.0 = 0.8 − ๐0.6 0.8+๐0.6 Superposition yields: ๐ผฬ๐๐ = 0.4 − ๐0.3 − (−๐0.25) = 0.4 − ๐0.05 ๐ผฬ๐๐ต = 0.4 − ๐0.3 + (−๐0.25) = 0.4 − ๐0.55 So that STa = 0.4 + j 0.05pu and ๐ฬ๐๐ต = 0.4 + ๐0.55 The transformer with the higher tap setting is supplying most of the reactive power to the load. The real power is divided equally between the transformers. 61 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 3.65 Same procedure as in Problem 3.64 is followed. Now ๐ก = 1.0∠4° So ๐ก − 1 = 1.0∠4° − 1∠0° = 0.07∠91.5° 0.07∠91.5° ๐ผฬ๐ถ๐ผ๐ ๐ถ = 0.2∠90° = 0.350 + ๐0.009 Then ๐ผฬ๐๐ = 0.4 − ๐0.3 − (0.350 + ๐0.009) = 0.050 − ๐0.309 ๐ผฬ๐๐ = 0.4 − ๐0.3 + (0.350 + ๐0.009) = 0.750 − ๐0.291 So ๐ฬ๐๐ = 0.050 + ๐0.309; ๐ฬ๐๐ = 0.750 + ๐0.291 The phase shifting transformer is useful to control the amount of real power flow; out has less effect on the reactive power flow. 62 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Chapter 4 Transmission Line Parameters 4.1 ๐ ๐๐,20 = 4.2 ๐= (10.37 Ω-cmil/ft)(10 ft) 50+234.5 = 1.659 mΩ; ๐ ๐๐,50 = (1.659 mΩ) ( ) = 1.854 mΩ (250 mil)2 20+234.5 (1 Ω)(500 mil)2 14000 feet ๐ = 17.857 Ω-cmil/ft; ๐2 = ๐2 (๐1 + ๐) − ๐ = 1 17.857 (20 + 228.1) − 228.1 = 17 32.5° C 4.3 l = 1.05 ๏ด 2000 = 2100 m , Allowing for the twist. X-sectional area of all 19 strands = 19 ๏ด R= ๏ฐ 4 ๏ด (1.5 ๏ด 10 −3 ) = 33.576 ๏ด 10 −6 m 2 . 2 Pl 1.72 ๏ด 10−8 ๏ด 2100 = = 1.076๏ ๏ฌ A 33.576 ๏ด 10−6 2 4.4 ๏ฆ ๏ฐ sq ๏ mil ๏ถ ๏ฆ 1in ๏ถ ๏ฆ 0.0254 m ๏ถ (a) 795 MCM = ( 795 ๏ด 103 cmil ) ๏ง 4 ๏ท ๏ง ๏ท ๏ท๏ง ๏จ 1 cmil ๏ธ๏จ 1000 mil ๏ธ ๏จ 1in ๏ธ = 4.0283 ๏ด 10 −4 m 2 2 ๏ฆ 50 + T ๏ถ (b) R60 HZ, 50°C = R60 HZ, 75°C ๏ง ๏ท ๏จ 75 + T ๏ธ ๏ฆ 50+228.1 ๏ถ = 0.0880 ๏ง ๏ท ๏จ 75+228.1 ๏ธ = 0.0807 ๏/km 4.5 Ω mi 1mi Ω ) = 0.07365 per conductor (at 75% current 1.609km km From Table A-4 ๐ 60 ๐ป๐ง,50°๐ถ = (0.1185 ) ( capacity). For 3 conductors per phase: ๐ 60 ๐ป๐ง,50°๐ถ = 4.6 Total transmission line loss PL = I= 0.07365 Ω = 0.02455 km per phase 3 2.5 (190.5) = 4.7625MW 100 190.5 ๏ด 103 = 500 A 3 ( 220 ) From PL = 3I 2 R , the line resistance per phase is R= 4.7625๏ด106 3 ( 500 ) 2 = 6.35 ๏ 63 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. The conductor cross-sectional area is given by A= ( 2.84 ๏ด 10−8 )( 63 ๏ด 103 ) = 2.81764 ๏ด 10−4 m 2 6.35 ๏d = 1.894cm = 0.7456in = 745.6 mil A = d 2 = ( 745.6 ) = 556,000 cmil 2 4.7 12 W 50+234.5 = 37.0 mΩ. ๐ = 10.37 ( ) = 11.59 Ω-cmil/ft; A)2 20+234.5 ๐ = (18 (11.59)(4000) diameter = √ 4.8 (a) 0.037 = 1119 mil = 1.119 in From Eq. (4.4.10) H ๏ถ๏ฆ 1000 m ๏ถ๏ฆ 1000 m H ๏ถ ๏ฆ1 Lint = ๏ง ๏ด 10 −7 ๏ท๏ง ๏ท๏ง ๏ท = 0.05mH/ km Per Conductor 2 m ๏จ ๏ธ๏จ 1km ๏ธ๏จ 1H ๏ธ (b) From Eq. (4.5.2) ๏ฆD๏ถH Lx = Ly = 2 ๏ด 10 −7 Ln ๏ง ๏ท ๏จ ๏๏ข ๏ธ m −1 ๏ฆ 0.015 ๏ถ −3 D = 0.5m ๏๏ข = e 4 ๏ง ๏ท = 5.841 ๏ด 10 m 2 ๏จ ๏ธ 0.5 ๏ฆ ๏ถ H ๏ฆ 1000 m ๏ถ๏ฆ 1000 mH ๏ถ Lx = Ly = 2 ๏ด 10 −7 Ln ๏ง ๏ง ๏ท๏ง ๏ท −3 ๏ท H ๏จ 5.841 ๏ด 10 ๏ธ m ๏จ km ๏ธ๏จ ๏ธ = 0.8899 mH per conductor km (c) L = L x + L y = 1.780 4.9 mH per circuit km (a) Lint = 0.05mH/ km Per Conductor 0.5 ๏ฆ ๏ถ 6 Lx = Ly = 2 ๏ด 10 −7 ln ๏ง 10 = 0.8535mH/ km Per Conductor −3 ๏ท ๏จ 1.2 ๏ด 5.841 ๏ด 10 ๏ธ L = L x + L y = 1.707mH / km Per Circuit (b) ๏ฌ12( Ic ) = 0.2 I c ln Dc 2 mWb/km Dc1 0.5 ๏ฆ ๏ถ 6 Lx = Ly = 2 ๏ด 10 −7 ln ๏ง 10 = 0.9346 mH/km Per Conductor −3 ๏ท 0.8 ๏ด 5.841 ๏ด 10 ๏จ ๏ธ L = L x + L y = 1.869mH/km Per Circuit. Lint is independent of conductor diameter. 64 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. The total inductance decreases 4.1% (increases 5%) at the conductor diameter increases 20 % (decreases 20%). 4.10 From Eq. (4.5.10) ๏ฆD๏ถH L1 = 2 ๏ด 10 −7 Ln ๏ง ๏ท ๏จ r๏ข ๏ธ m D = 4 ft −1 ๏ฆ .5 ๏ถ ๏ฆ 1ft ๏ถ r๏ข = e 4 ๏ง ๏ท ๏ง ๏ท ๏จ 2 ๏ธ ๏จ 12 in ๏ธ 4 ๏ฆ ๏ถ L1 = 2 ๏ด 10 −7 Ln ๏ง −2 ๏ท 1.6225 ๏ด 10 ๏จ ๏ธ H m L1 = 1.101 ๏ด 10 −6 r ๏ข = 1.6225 ๏ด 10 −2 ft X1 = ๏ท L1 = ( 2๏ฐ 60 ) (1.101๏ด 10−6 ) (1000 ) = 0.4153 ๏ / km 4.8 ๏ฆ ๏ถ 4.11 (a) L1 = 2 ๏ด 10 −7 ln ๏ง = 1.138 ๏ด 10 −6 H/m −2 ๏ท ๏จ 1.6225 ๏ด 10 ๏ธ X1 = ๏ท L1 = 2๏ฐ ( 60 ) (1.138 ๏ด 10−6 ) (1000 ) = 0.4292 ๏ /km 3.2 ๏ฆ ๏ถ (b) L1 = 2 ๏ด 10 −7 ln ๏ง = 1.057 ๏ด 10 −6 H/m −2 ๏ท 1.6225 ๏ด 10 ๏จ ๏ธ X1 = 2๏ฐ ( 60 ) (1.057 ๏ด 10−6 ) (1000 ) = 0.3986 ๏ / km L1 and X1 increase by 3.35% (decrease by 4.02%) as the phase spacing increases by 20% (decreases by 20%). 4.12 For this conductor, Table A.4 lists GMR to be 0.0217 ft. For one conductor, ๐ฟ๐ฅ = 2 × 10−7 ln 25 =1.409μH/m; The inductive reactance is 2๐(60)(๐ฟ๐ฅ )Ω/m = 0.0217 0.531 Ω/km = 0.855 Ω/mi. For the single-phase line, with two conductors, 2 × 0.855 = 1.710 Ω/mi. 4.13 (a) The total line inductance is given by D๏น ๏ฉ LT = ๏ช 4 ๏ด 10−4 ln ๏บ mH/ m r๏ข ๏ป ๏ซ 3.5 = 4 ๏ด 10−4 ln = 0.002 mH/ m ( 0.7788 )( 0.03) (b) The total line reactance is given by XT = 2๏ฐ ( 60 ) 4 ๏ด 10 −4 ln = 0.1508 ln or 0.2426 ln D r๏ข D ๏ / km r๏ข D ๏ / mi r๏ข 65 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ X T = 0.755 ๏ / km or 1.215 ๏ / mi (c) LT = 4 ๏ด 10−4 ln 7 = 0.00228 mH/ m 0.7788 ( 0.03) Doubling the separation between the conductors causes only about a 14% rise in inductance. 4.14 (a) Eq. (4.5.9): L = 2 ๏ด 10 −7 ln D H/m Per Phase r๏ข X = ๏ท L = 4๏ฐ f ๏ด 10 −7 ln ( D / r ๏ข ) ๏ / m/ Phase = f .๏๏ฐ ๏ด 10 −7 (1609.34 ) ln ( D / r ๏ข ) ๏ / MILE /PH. = f .4๏ฐ (1609.34 )( 2.3026 )10 −7 log ( D / r ๏ข ) ๏ /mi /ph. = 4.657 ๏ด 10 −3 f log ( D / r ๏ข ) ๏ /mi/ph. = 0.2794 log ( D / r ๏ข ) ๏ / mi / ph. at f = 60 HZ . ๏ฆD๏ถ ๏ฆ1๏ถ ๏ X = k log ๏ง ๏ท = k log D + k log ๏ง ๏ท , Where k = 4.657 ๏ด 10 −3 f ๏ข r ๏จ ๏ธ ๏จ r๏ข ๏ธ ๏ฌ (b) r ๏ข = r.e −1/ 4 = 0.06677 ( 0.7788 ) = 0.052 ft. X a = k log 1 ๏ฆ 1 ๏ถ = 0.2794 log ๏ง ๏ท = 0.35875 r๏ข ๏จ 0.052 ๏ธ X d = k log D = 0.2794 log (10 ) = 0.2794 X = X a + X d = 0.63815 ๏ / mi/ ph. ๏ฌ When spacing is doubled, X d = 0.36351 and X = 0.72226 ๏ / mi/ph. ๏ฌ 66 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 4.15 For each of six outer conductors: − 1 D11 = r ๏ข = e 7 r D12 = D16 = D17 = 2r D13 = D15 = 2 3r D14 = 4r For the inner conductor: − 1 D77 = ๏1 = e 4 r D71 = D72 = D73 = D74 = D75 = D76 = 2r ๏ฉ ๏น ๏ฉ ๏น 2 1 ๏ช๏ฆ − 1 ๏ถ ๏บ ๏ช ๏บ ๏ญ − ๏ฆ ๏ถ 3 6 ๏ช๏ง e 4 r ๏ท ( 2r ) 2 3r ( 4r ) ๏บ ๏ช ๏ง e 4 r ๏ท ( 2r ) ๏บ Ds = GMR = 49 ๏ช๏จ 6 ๏บ ๏ช ๏จ ๏บ ๏ธ ๏ธ ๏ซ๏ช Distances for each Outer conducter ๏ป๏บ Six outer conductors ๏ซ๏ช Distances for inner conductor ๏ป๏บ ( ) 6 ( ) 7 ( ) 1 12 ๏ฆ −1 ๏ถ 18 6๏ฆ − ๏ถ 6 Ds = GMR = r ๏ง e 4 ๏ท ( 2 ) 2 3 ( 4 ) ๏ง e 4 ๏ท ( 2 ) ๏จ ๏ธ ๏จ ๏ธ 49 12 ๏ฆ −1 ๏ถ 24 6 Ds = GMR = r ๏ง e 4 ๏ท ( 2 ) 2 3 ( 4 ) = 2.177 r ๏จ ๏ธ 49 4.16 2 ( DSL = N b D11 D12 ๏๏๏ D1N b ) = ( D D ๏๏๏ D ) Nb 11 12 1N b 1 Nb ๏ฉ ( n -1) ๏ฐ ๏น D11 = DS D1n = 2 A sin ๏ช ๏บ n = 2,3, ๏๏๏ N b ๏ซ Nb ๏ป 1 ๏ฌ๏ฏ ๏ฉ ๏ฆ ๏ฐ ๏ถ๏น ๏ฉ ๏ฆ 2๏ฐ ๏ถ ๏น ๏ฉ ๏ฆ 3๏ฐ ๏ถ ๏น ๏ฉ ๏ฆ N b − 1 ๏ถ ๏น ๏ผ๏ฏ Nb DSL = ๏ญ DS ๏ช2 A sin ๏ง 2 A sin 2 A sin ๏๏๏ 2 A sin ๏ท๏บ ๏ช ๏ง ๏ท๏บ ๏ช ๏ง ๏ท๏บ ๏ช ๏ง ๏ท๏ฐ ๏บ ๏ฝ ๏จ N b ๏ธ ๏บ๏ป ๏ช๏ซ ๏จ N b ๏ธ ๏บ๏ป ๏ช๏ซ ๏จ N b ๏ธ ๏บ๏ป ๏ช๏ซ ๏จ N b ๏ธ ๏บ๏ป ๏ฏ๏พ ๏ฏ๏ฎ ๏ช๏ซ Using the trigonometric identity, ๏ป ( N −1) DSL = DS ( A ) b ๏ฝ 1 N b Nb which is the desired result. 67 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Two-conductor bundle, Nb = 2 d A= 2 ๏ฉ ๏ฆd๏ถ ๏น DSL = ๏ช DS ๏ง ๏ท ( 2 ) ๏บ ๏ซ ๏จ2๏ธ ๏ป 1/ 2 = DS d Eq (4.6.19) Three-conductor bundle, Nb = 3 A= ๏ฉ ๏ฆ d ๏ถ2 ๏น DSL = ๏ช DS ๏ง ๏ท 3๏บ ๏ช๏ซ ๏จ 3 ๏ธ ๏บ๏ป d 3 1/ 3 3 = √๐ท๐ ๐2Eq (4.6.20) Four-conductor bundle, Nb = 4 ๏ฉ ๏ฆ d ๏ถ3 ๏น A= DSL = ๏ช DS ๏ง ๏ท 4๏บ 2 ๏ช๏ซ ๏จ 2 ๏ธ ๏บ๏ป d 1/ 4 ๏ฆ 4 ๏ถ = 4 DS d 3 4 ๏ง ๏ท ๏จ2 2 ๏ธ = 1.0905 4 DS d 3 Eq (4.6.21) 3 1 ๏ฉ๏ฆ − 1 ๏ถ ๏น 3 − 4.17 (a) GMR = 9 ๏ช๏ง e 4 r ๏ท ( 2r )( 2r ) ๏บ = r 4e 4 ๏ธ ๏ซ๏จ ๏ป = 1.4605 r 2 ๏ฉ ๏น ๏ฉ ๏น ๏ช๏ฆ − 1 ๏ถ ๏บ ๏ช๏ฆ − 1 ๏ถ ๏บ (b) GMR = 16 ๏ช๏ง e 4 r ๏ท ( 2r )( 4r )( 6r ) ๏บ ๏ช๏ง e 4 r ๏ท ( 2r )( 2r )( 4r ) ๏บ ๏ช๏จ ๏บ ๏ช๏จ ๏บ ๏ธ ๏ธ ๏ช๏ซ Distancesfor each outer conductor ๏บ๏ป ๏ช๏ซ Distancesfor each inner conductor ๏บ๏ป 2 4 ๏ฆ −1 ๏ถ 6 4 2 GMR = 16 ๏ง e 4 ๏ท ( 2 ) ( 4 ) ( 6 ) ( r ) = 2.1554r ๏จ ๏ธ 68 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฉ ๏ช๏ฆ − ๏ถ (c) GMR = r ๏ช๏ง e ๏ท ( 2 ) ( 4 ) ๏ช๏จ ๏ธ ๏ซ๏ช 4 1 81 2 4 2 ๏น ๏ฉ ๏บ ๏ช๏ฆ − ๏ถ 32 ๏บ ๏ด ๏ช๏ง e ๏ท ( 2 ) ๏ธ ๏บ ๏ช๏จ ๏ป๏บ ๏ซ๏ช ( 20 ) ( 8 )( ) 2 Distances for each corner conductor 1 4 3 ( 8) ( 2 ๏น ๏บ 20 ( 4 ) ๏บ ๏บ ๏ป๏บ ) 4 2 Distances for each outside non-corner conductor ๏ฉ ๏ช๏ฆ − ๏ถ ๏ด ๏ช๏ง e ๏ท ( 2 ) ๏ช๏จ ๏ธ ๏ช๏ซ 1 4 4 ๏น ๏บ 8 ๏บ ๏บ ๏บ๏ป ( ) 4 Distances for the center conductor 9 ๏ฆ −1 ๏ถ 24 GMR = r 81 ๏ง e 4 ๏ท ( 2 ) ๏จ ๏ธ ( 8 ) ( 20 ) ( 4 ) ( 32 ) 16 16 12 4 GMR = 2.6374 r 4.18 ๐ = 0.1128 Ω 3 ; ๐ ๐๐ = √7.5 ⋅ 7.5 ⋅ 15 = 9.45 m; mi 1m From Table A.4, ๐ท๐ = (0.043 ft) 3.28ft = 0.0123 m; ๐ท๐๐ 9.45 ๐ฟ๐ = 2 × 10−7 ln ( ๐ท ) = 2 × 10−7 ln (0.0123) = 1.3239 μH/m; ๐ ๐ = ๐ + ๐๐๐ฟ = 0.1128 ( = 0.0701 + ๐0.499 1 1.609 km mi ) + ๐(2)(๐)(60)(1.3239 × 10−6 )(1000 m/km) Ω km ๐ท๐๐ 3 10.39 4.19 (a) ๐ ๐๐ = √8.25 ⋅ 8.25 ⋅ 16.5 = 10.39 m; ๐ฟ๐ = 2 × 10−7 ln ( ๐ท ) = 2 × 10−7 ln (0.0123) = ๐ 1.3478 μH/m; ๐ = ๐ + ๐๐๐ฟ = 0.1128 ( 1 1.609 km mi ) + ๐(2)(๐)(60)(1.3478 × Ω 10−6 )(1000 m/km) = 0.0701 + ๐0.508 km ๐ท 3 8.50 )= 0.0123 (b) ๐ ๐๐ = √6.75 ⋅ 6.75 ⋅ 13.5 = 8.50 m; ๐ฟ๐ = 2 × 10−7 ln ( ๐๐ ) = 2 × 10−7 ln ( ๐ท๐ 1.3076 μH/m; ๐ = ๐ + ๐๐๐ฟ = 0.1128 ( 1 1.609 km mi ) + ๐(2)(๐)(60)(1.3076 × Ω 10−6 )(1000 m/km) = 0.0701 + ๐0.493 km 69 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (c) ๐ = 0.1185 Ω 1m ; From Table A.4, ๐ท๐ = (0.0391 ft) = 0.0119 m; ๐ฟ๐ = 2 × mi 3.28ft ๐ท 9.45 10−7 ln ( ๐ท๐๐ ) = 2 × 10−7 ln (0.0119) = 1.3354 μH/m; ๐ = ๐ + ๐๐๐ฟ = 0.1185 ( ๐ 1 1.609 km mi )+ Ω ๐(2)(๐)(60)(1.3354 × 10−6 )(1000 m/km) = 0.0736 + ๐0.503 km (d) ๐ = 0.1035 Ω 1m ; From Table A.4, ๐ท๐ = (0.0420 ft) = 0.00128 m; ๐ฟ๐ = mi 3.28ft ๐ท 9.45 2 × 10−7 ln ( ๐ท๐๐ ) = 2 × 10−7 ln (0.00128) = 1.3208 μH/m; ๐ = ๐ + ๐๐๐ฟ = ๐ 0.1035 ( 1 1.609 Ω km mi ) + ๐(2)(๐)(60)(1.3208 × 10−6 )(1000 m/km) = 0.0643 + ๐0.498 km 3 4.20 ๐ท๐๐ = √12 × 12 × 24 = 15.12 m 1m From table A.4, ๐ท๐ = (0.0435 ft) (3.28ft) = 0.0133m DSL = [Dsd2](1/3) = [(0.0133)(0.5)2] (1/3) = 0.1493m 15.12 ๐1 = ๐๐ฟ1 = 2๐(60)2 × 10−7 ln (0.1493) = 0.348 Ω/km 4.21 (a) From Table A.4: ๏ฆ 1 ๏ถ DS = ( 0.0479 ) ๏ง ๏ท = 0.0146 m ๏จ 3.28 ๏ธ DSL = 3 ( 0.0146 )( 0.5 ) = 0.154 m 2 ๏ฉ ๏ ๏ฆ 15.12 ๏ถ ๏น X 1 = ( 2๏ฐ 60 ) ๏ช 2 ๏ด 10−7 Ln ๏ง ๏ท ๏บ ๏ด 1000 = 0.346 km ๏จ 0.154 ๏ธ ๏ป ๏ซ ๏ฆ 1 ๏ถ (b) DS = ( 0.0391) ๏ง ๏ท = 0.0119m ๏จ 3.28 ๏ธ DSL = 3 ( 0.0119 )(.5 )(.5 ) = 0.144 m ๏ฉ ๏ ๏ฆ 15.12 ๏ถ ๏น X 1 = ( 2๏ฐ 60 ) ๏ช 2 ๏ด 10−7 Ln ๏ง ๏ท ๏บ ๏ด 1000 = 0.351 km ๏จ 0.144 ๏ธ ๏ป ๏ซ Results ACSR Conductor Aluminum Cross Section X1 kcmil ๏๏ฏkm Canary 900 0.352 Finch 1113 0.348 Martin 1351 0.346 % change 0.9% 0.6% 70 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 4.22 Application of Eq. (4.6.6) yields the geometric mean distance that separates the two bundles: DAB = 9 ( 6.1) ( 6.2 ) ( 6.3) 6 ( 6.05)( 6.15)( 6.25) = 6.15m 2 2 The geometric mean radius of the equilateral arrangement of line A is calculated using Eq. (4.6.7): RA = 9 ( 0.015576 ) ( 0.1) = 0.0538m 3 6 In which the first term beneath the radical is obtained from r ๏ข = 0.7788 r = 0.7788 ( 0.02 ) = 0.015576 m The geometric mean radius of the line B is calculated below as per its configuration: RB = 9 ( 0.015576 ) ( 0.1) ( 0.2 ) = 0.0628m 3 4 2 The actual configuration can now be replaced by the two equivalent hollow conductors each with its own geometric mean radius and separated by the geometric mean distance as shown below: 4.23 (a) The geometric mean radius of each phase is calculated as R = 4 ( r ๏ข ) ( 0.3) where r ๏ข = 0.7788 ๏ด 0.0074 2 2 = 0.0416m The geometric mean distance between the conductors of phases A and B is given by DAB = 4 62 ( 6.3)( 5.7 ) = 5.996 − 6m Similarly, DBC = 4 62 ( 6.3)( 5.7 ) = 5.996 − 6m and DCA = 4 122 (12.3)(11.7 ) = 11.998 −12m The GMD between phases is given by the cube root of the product of the three-phase spacings. Deq = 3 6 ๏ด 6 ๏ด 12 = 7.56m The inductance per phase is found as L = 0.2 ln or 7.56 = 1.041mH/km 0.0416 L = 1.609 ๏ด 1.041 = 1.674 mH/mi (b) The line reactance for each phase then becomes X = 2๏ฐ f L = 2๏ฐ ( 60 )1.674 ๏ด 10 −3 = 0.631๏ / mi per phase 71 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 4.24 From the ACSR Table A.4 of the text, conductor GMR = 0.0244 ft. Conductor diameter = 0.721 in.; since ( 40 ) + (16 ) = 43.08, 2 2 GMD between phases = ๏ฉ๏ซ( 43.08 )( 80 )( 43.08 ) ๏น๏ป 1/ 3 (a) ๏ X = k log = 52.95 in. D ๏ฆ 52.95 /12 ๏ถ = 0.2794 log ๏ง ๏ท = 0.6307 ๏ /mi ๏ฌ r๏ข ๏จ 0.0244 ๏ธ ๏ฆ 52.95 /12 ๏ถ −7 (b) L = 2 ๏ด 10 −7 ln ๏ง ๏ท = 10.395 ๏ด 10 H/m ๏จ 0.0244 ๏ธ X = ๏ท L = 2๏ฐ ( 60 )10.395 ๏ด 10 −7 ๏ / m = 2๏ฐ ( 60 )10.395 ๏ด 10 −7 (1609.34 ) ๏ mi = 0.6307๏ /mi ๏ฌ 4.25 Resistance per phase = 0.12 = 0.03๏ / mi 4 GMD = ๏ฉ๏ซ( 41.76 )( 80 )( 41.76 ) ๏น๏ป 1/ 3 , using 402 + 122 = 41.76. = 51.78ft. 3 GMR for the bundle :1.091 ๏ฉ( 0.0403 )(1.667 ) ๏น ๏ซ ๏ป 1/ 4 by Eq. (4.6.21) [Note: from Table A.4, conductor diameter. = 1.196 in.; r = 1.196 1 ๏ด = 0.0498ft.] and conductor 2 12 GMR = 0.0403 ft. GMR for the 4-conductor bundle = 0.7171 ft ๏ฆ 51.87 ๏ถ ๏ X = 0.2794 log ๏ง ๏ท = 0.5195 ๏ / mi ๏ฌ ๏จ 0.7171 ๏ธ Rated current carrying capacity for each conductor in the bundle, as per Table A.4, is 1010 A; since it is a 4-conductor bundle, rated current carrying capacity of the overhead line is 1010 ๏ด 4 = 4040A ๏ฌ 4.26 Bundle radius A is calculated by 0.4572 = 2 A sin(๏ฐ / 8) or A = 0.5974 m GMD = 17m ๏ฆ 4.572 ๏ถ Subconductor’s GMR is r ๏ข = 0.7788 ๏ง ๏ด 10 −2 ๏ท = 1.7803 ๏ด 10 −2 m ๏จ 2 ๏ธ ๏ฌ ๏ผ GMD 20 ๏ฏ ๏ฏ −7 L = 2 ๏ด 10 ln = 2 ๏ด 10 ln ๏ญ ๏ฝ 1/8 N -1 1/ N 7 [ Nr๏ข( A) ] ๏ฏ ๏ฉ8 (1.7803 ๏ด 10−2 ) ( 0.5974 ) ๏น ๏ฏ ๏ป ๏พ ๏ฎ๏ซ −7 72 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. which yields L = 7.38 ๏ด 10−7 H / m ๏ฌ 4.27 (a) DABeq = [30 ๏ด 30 ๏ด 60 ๏ด 120]1/ 4 = 50.45ft DBCeq = [30 ๏ด 30 ๏ด 60 ๏ด 120]1/ 4 = 50.45ft DACeq = [60 ๏ด 60 ๏ด 150 ๏ด 30]1/ 4 = 63.44 ft ๏ GMD = (50.45 ๏ด 50.45 ๏ด 63.44)1/ 3 = 54.46 ft Equivalent GMR = ๏ฉ๏ซ(0.0588)3 (90)3 ๏น๏ป 1/ 6 = 2.3ft ๏ฆ 54.46 ๏ถ −6 ๏ L = 2 ๏ด 10 −7 ln ๏ง ๏ท = 0.633 ๏ด 10 H/m ๏ฌ ๏จ 2.3 ๏ธ (b) Inductance of one circuit is calculated below: Deq = [30 ๏ด 30 ๏ด 60]1/ 3 = 37.8ft; r ๏ข = 0.0588ft ๏ฆ 37.8 ๏ถ −6 ๏ L = 2 ๏ด 10 −7 ln ๏ง ๏ท = 1.293 ๏ด 10 H/m ๏จ 0.0588 ๏ธ Inductance of the double circuit = 1.293 ๏ด 10 −6 = 0.646 ๏ด 10 −6 H/m ๏ฌ 2 ๏ฆ 0.633 − 0.646 ๏ถ Error percent = ๏ง ๏ท ๏ด 100 = −2.05% ๏ฌ 0.633 ๏จ ๏ธ 4.28 With N = 3, S = 21๏ข๏ข , A = S 21/12 = = 1.0104 ft 2sin 60๏ฐ 2 ๏ด 0.866 Conductor GMR = 0.0485ft 2 Bundle GMR = ๏ฉ3 ( 0.0485 )(1.0104 ) ๏น ๏ซ ๏ป Then rA๏ข = ๏ฉ๏ซ( GMRb )( DAA๏ข ) ๏น๏ป rB๏ข = ( GMRb ๏ DBB๏ข ) 1/ 2 rC๏ข = ( GMRb ๏ DCC ๏ข ) 1/ 2 1/ 3 = 0.5296 ft ( 1/ 2 = 0.5296 ๏ด 322 + 362 = ( 0.5296 ๏ด 96 ) 1/ 2 1/ 3 1/ 2 = 7.13ft = ๏ฉ0.5296 ๏ด 322 + 362 ๏น ๏ซ ๏ป Overall Phase GMR = ( rA๏ขrB๏ขrC๏ข ) ) = 5.05ft 1/ 2 = 5.05ft = 5.67ft DABeq = ๏ฉ 32 2 + 36 2 ๏ 64 2 + 36 2 ๏ ( 64 )( 32 ) ๏น ๏ซ ๏ป DBCeq = ๏ฉ( 32 ) 64 2 + 36 2 ๏ 64 ๏ 32 2 + 36 2 ๏น ๏ซ ๏ป DACeq = ๏ฉ๏ซ( 36 )( 32 )( 36 )( 32 ) ๏น๏ป 1/ 4 1/ 4 1/ 4 = 51.88ft = 51.88ft = 33.94 ft ๏ GMD = ๏ 51.88 ๏ด 51.88 ๏ด 33.94 ๏ 1/ 3 = 45.04 ft ๏ฆ 45.04 ๏ถ Then X L = 0.2794 log ๏ง ๏ท = 0.2515 ๏ /mi/phase ๏ฌ ๏จ 5.67 ๏ธ 73 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 4.29 rA๏ข = ๏ฉ๏ซ0.5296 ( 32 ) ๏น๏ป rB๏ข = ๏ฉ๏ซ0.5296 ( 32 ) ๏น๏ป 1/ 2 = 4.117ft 1/ 2 = 4.117ft rC๏ข = ๏ฉ๏ซ0.5296 ( 32 ) ๏น๏ป 1/ 2 = 4.117ft Then GMR phase = 4.117ft ๏ป ๏ฝ 1/ 4 2 2 DABeq = ๏ฉ ( 36 ) + ( 32 ) 36 ๏ 642 + 362 ๏น ๏ซ ๏ป DBCeq = ๏ฉ๏ซ( 64 )( 96 )( 32 )( 64 ) ๏น๏ป 1/ 4 ๏ป DACeq = ๏ฉ ( 32 ) + ( 36 ) ๏ซ 2 2 = 49.76ft = 59.56ft ๏ฝ 36 + 64 ๏ (36)๏น๏ป = 49.76ft 1/ 4 2 2 Then GMD = ( 49.76 ๏ด 59.56 ๏ด 49.76 ) 1/ 3 = 52.83ft ๏ฆ 52.83 ๏ถ X L = 0.2794 log ๏ง ๏ท = 0.3097 ๏ /mi/phase ๏ฌ ๏จ 4.117 ๏ธ 4.30 rA๏ข = ๏ฉ๏ซ0.5296 ( 96 ) ๏น๏ป rB๏ข = ๏ฉ๏ซ0.5296 ( 32 ) ๏น๏ป 1/ 2 = 7.13ft 1/ 2 = 4.117ft = rC๏ข From which GMRphase = ( 7.13 ๏ด 4.117 ๏ด 4.117 ) 1/ 3 DABeq = ( 32 ๏ด 64 ๏ด 32 ๏ด 64 ) 1/ 4 ๏ป = 4.95ft = 45.25ft ๏ฝ 2 2 DBCeq = ๏ฉ๏ช( 36 ) ( 32 ) + ( 36 ) ( 36 ) ๏น๏บ ๏ซ ๏ป DACeq = ๏ฉ๏ซ( 322 + 362 ) (642 + 362 ) ๏น๏ป 1/ 4 1/4 = 41.64 ft = 59.47ft Then GMD = ( 45.25 ๏ด 41.64 ๏ด 59.47 ) 1/ 3 = 48.21ft ๏ฆ 48.21 ๏ถ X L = 0.2794 log ๏ง ๏ท = 0.2762 ๏ /mi/ph. ๏ฌ ๏จ 4.95 ๏ธ 4.31 Flux linkage between conductors 1 & 2 due to current, Ia, is ๏ฌ12( I ) = 0.2 I a ln a Da 2 mWb/km Da1 Db1 = Db 2 , ๏ฌ12 due to I b is zero. ๏ฌ12( I ) = 0.2 I c ln c Dc 2 mWb/km Dc1 Total flux linkages between conductors 1 & 2 due to all currents is 74 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฌ12 = 0.2 I a ln Da 2 D + 0.2 I c ln c 2 mWb/km Da1 Dc1 For positive sequence, with I a as reference, I c = I a ๏ − 240๏ฐ ๏ฆ D D ๏ถ ๏ ๏ฌ12 = 0.2 I a ๏ง ln a 2 + (1๏ − 240๏ฐ ) ln c 2 ๏ท Dc1 ๏ธ ๏จ Da1 = 0.2 ( 250 ) ๏ฉ๏ซ ln ( 7.21/ 6.4 ) + (1๏ − 240๏ฐ ) ln ( 6.4 / 7.21) ๏น๏ป = 10.31๏ − 30๏ฐ mWb/km ๏ฉ Note: Da1 = Dc 2 = 42 + 52 = 6.4 m ๏น ๏ช ๏บ 2 2 1/ 2 ๏ช ๏บ ๏ฉ ๏น D = D = 5.2 + 5 = 7.21m a2 c1 ๏ช๏ซ ๏ซ( ) ( ) ๏ป ๏ป๏บ with I a as reference, instantaneous flux linkage is ๏ฌ12 ( t ) = 2 ๏ฌ12 cos(๏ทt + ๏ก ) ๏ Induced voltage in the telephone line per km is VRMS = ๏ท๏ฌ12 ๏๏ก + 90๏ฐ = j๏ท๏ฌ12 = j ( 2๏ฐ ๏ด 60 )(10.31๏ − 30๏ฐ )10 −3 = 3.89๏60๏ฐ V ๏ฌ 4.32 Cn = 2๏ฐ ( 8.854 ๏ด 10 −12 ) 2๏ฐ๏ฅ 0 F = = 1.3246 ๏ด 10 −11 to neutral m ๏ฆD๏ถ ๏ฆ 0.5 ๏ถ Ln ๏ง ๏ท Ln ๏ง ๏ท ๏จ๏๏ธ ๏จ 0.015 / 2 ๏ธ Yn = j๏ทCn = j ( 2๏ฐ 60 ) (1.3246 ๏ด 10 −11 ) Yn = j 4.994 ๏ด 10 −6 4.33 (a) Cn = S m ๏ด 1000 m km S to neutral km 2๏ฐ ( 8.854 ๏ด 10−12 ) = 1.385 ๏ด 10−11 F/ m to neutral ๏ฆ 0.5 ๏ถ ln ๏ง ๏ท ๏จ 0.018 / 2 ๏ธ Yn = j 2๏ฐ ( 60 )1.385 ๏ด 10 −11 (1000 ) = j 5.221 ๏ด 10 −6 S/km to neutral (b) Cn = 2๏ฐ ( 8.854 ๏ด 10 −12 ) ๏ฆ 0.5 ๏ถ ln ๏ง ๏ท ๏จ 0.012 / 2 ๏ธ = 1.258 ๏ด 10 −11 F/m to neutral Yn = j 2๏ฐ ( 60 )1.258 ๏ด 10 −11 (1000 ) = j 4.742 ๏ด 10 −6 S/km to neutral Both the capacitance and admittance-to-neutral increase 4.5% (decrease 5.1%) as the conductor diameter increases 20% (decreases 20%). 75 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 4.34 2๏ฐ ( 8.854 ๏ด 10 −12 ) 2๏ฐ๏ฅ 0 F C1 = = = 1.058 ๏ด 10 −11 4 m ๏ฆD๏ถ ๏ฆ ๏ถ Ln ๏ง ๏ท Ln ๏ง ๏ท ๏ 0.25 /12 ๏จ ๏ธ ๏จ ๏ธ Y1 = j๏ทC1 = j ( 2๏ฐ 60 ) (1.058 ๏ด 10 −11 ) (1000 ) = j 3.989 ๏ด 10 −6 4.35 (a) C1 = S km 2๏ฐ ( 8.854 ๏ด 10 −12 ) ๏ฆ 4.8 ๏ถ ln ๏ง ๏ท ๏จ 0.25 /12 ๏ธ = 1.023 ๏ด 10 −11 F/m Y1 = j 2๏ฐ ( 60 )1.023 ๏ด 10 −11 (1000 ) = j3.857 ๏ด 10 −6 S/km (b) C1 = 2๏ฐ ( 8.854 ๏ด 10 −12 ) ๏ฆ 3.2 ๏ถ ln ๏ง ๏ท ๏จ 0.25 /12 ๏ธ = 1.105 ๏ด 10 −11 F/m Y1 = j 2๏ฐ ( 60 )1.105 ๏ด 10 −11 (1000 ) = j 4.167 ๏ด 10 −6 S/km The positive sequence shunt capacitance and shunt admittance both decrease 3.3% (increase 4.5%) as the phase spacing increases by 20% (decreases by 20%) 4.36 (a) Equations (4.10.4) and (4.10.5) apply. For a 2-conductor bundle, the GMR Dsc = rd = 0.0074 ๏ด 0.3 = 0.0471 The GMD is given by Deq = 3 6 ๏ด 6 ๏ด 12 = 7.56m Hence the line-to-neutral capacitance is given by Can = or 2๏ฐ๏ฅ F/m ln( Deq / Dsc ) 55.63 = 10.95nF/km ln ( 7.56 / 0.0471) ( with ๏ฅ = ๏ฅ 0 ) or 1.609 ๏ด 10.95 = 17.62 n F/mi (b) The capacitive reactance at 60 HZ is calculated as XC = Deq 1 = 29.63 ๏ด 103 ln ๏ − mi 2๏ฐ ( 60 ) Can Dsc = 29.63 ๏ด 10 3 ln 7.56 = 150,500 ๏ − mi 0.0471 or 150,500 ๏ด 1.609 = 242,154 ๏ − km 76 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (c) With the line length of 100 mi, the capacitive reactance is found as 150,500 = 1505 ๏ / Phase 100 4.37 (a) Eq (4.9.15): capacitance to neutral = XC = 2๏ฐ๏ฅ F/m ln( D / r ) 1 ln( D / r ) = ๏ ๏ m to neutral 2๏ฐ fC (2๏ฐ f )(2๏ฐ๏ฅ ) with f = 60HZ, ๏ฅ = 8.854 ๏ด 10 −12 F/m . or XC = k ๏ข log ( D / r ) , where k ๏ข = ๏ฆ1๏ถ = k ๏ข log D + k ๏ข log ๏ง ๏ท , ๏จr๏ธ 4.1 ๏ด 106 , ๏ ๏ mile to neutral ๏ฌ f where k ๏ข = 0.06833 ๏ด 106 at f = 60 HZ . (b) X d๏ข = k ๏ข log D = 0.06833 ๏ด 106 log (10 ) = 68.33 ๏ด 103 1 ๏ฆ1๏ถ X a๏ข = k ๏ข log ๏ง ๏ท = 0.06833 ๏ด 106 log = 80.32 ๏ด 103 0.06677 ๏จr๏ธ ๏ Xc = X d๏ข + X a๏ข = 148.65 ๏ด 103 ๏ ๏ mi to neutral ๏ฌ When spacing is doubled, X d๏ข = 0.06833 ๏ด 106 log ( 20 ) = 88.9 ๏ด 103 Then XC = 169.12 ๏ด 103 ๏ ๏ mi to neutral ๏ฌ 4.38 ๏ฆ 52.95 /12 ๏ถ C = 0.0389 / log ๏ง = 0.018๏ญ F/mi/ph . ๏ง 0.721/ (12 ๏ด 2 ) ๏ท๏ท ๏จ ๏ธ XC = 1 = 147.366 ๏ด 103 ๏ ๏ mi ๏ฌ 2๏ฐ ( 60 ) 0.018 ๏ด 10 −6 3 4.39 ๐ท๐๐ = √7.5 ⋅ 7.5 ⋅ 15 = 9.45 m; From Table A.4, ๐ = ๐ถ1 = 2๐๐0 ๐ท ln( ) ๐ = 1.196 0.0254m in 1in = 0.01519m; 2 2๐ 8.854×10−12 ln( 9.45 ) 0.01519 = 8.648 × 10−12 F/m; S ๐ = ๐๐๐ถ = ๐2๐(60)8.648 = ๐3.260 × 10−6 km 77 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 3 4.40 (a) ๐ท๐๐ = √8.25 ⋅ 8.25 ⋅ 16.5 = 8.50 m; ๐ถ1 = 2๐๐0 ๐ท ln( ) ๐ = 2๐ 8.854×10−12 ln( 8.50 ) 0.01519 = 8.522 × 10−12 F/m ๐ = ๐๐๐ถ = ๐2๐(60)8.648 = ๐3.213 × 10−6 S km 3 (b) ๐ท๐๐ = √6.75 ⋅ 6.75 ⋅ 13.5 = 10.39 m; ๐ถ1 = 2๐๐0 ๐ท ln( ) ๐ = 2๐ 8.854×10−12 ln( 10.39 ) 0.01519 = 8.792 × 10−12 F/m; ๐ = ๐๐๐ถ = ๐2๐(60)8.648 = ๐3.315 × 10−6 4.41 S km Deq = 3 10 ๏ด 10 ๏ด 20 = 12.6m From Table A.4, r = 1.293 ๏ฆ 0.0254 m ๏ถ in ๏ง ๏ท = 0.01642 m 2 ๏จ 1in ๏ธ DSC = 3 rd 2 = 3 0.01642(0.5)2 = 0.16 m C1 = 2๏ฐ ( 8.854 ๏ด 10 −12 ) 2๏ฐ๏ฅ 0 = = 1.275 ๏ด 10 −11 F/m Deq ๏ฆ 12.6 ๏ถ ln ๏ง ln ๏ท DSc ๏จ 0.16 ๏ธ Y1 = j๏ทC1 = j 2๏ฐ ( 60 )1.275 ๏ด 10 −11 (1000 ) = j 4.807 ๏ด 10 −6 S/km Q1 = VLL 2Y1 = ( 500 ) 4.807 ๏ด 10 −6 = 1.2 MVAR/ km 2 4.42 (a) From Table A.4, r = 1.424 ( 0.0254 ) = 0.0181m 2 DSc = 3 0.0181( 0.5 ) = 0.1654 m 2 C1 = 2๏ฐ ( 8.854 ๏ด 10 −12 ) = 1.284 ๏ด 10 −11 F/m ๏ฆ 12.6 ๏ถ ln ๏ง ๏ท ๏จ 0.1654 ๏ธ Y1 = j 2๏ฐ ( 60 ) (1.284 ๏ด 10 −11 ) (1000 ) = j 4.842 ๏ด 10 −6 S/km Q1 = ( 500 ) 4.842 ๏ด 10 −6 = 1.21MVAR/ km 2 (b) r = 1.162 2 ( 0.0254 ) = 0.01476 m; DSc = 3 0.01476 ( 0.5 ) = 0.1546 m 2 C1 = 2๏ฐ ( 8.854 ๏ด 10 −12 ) = 1.265 ๏ด 10 −11 F/m ๏ฆ 12.6 ๏ถ ln ๏ง ๏ท ๏จ 0.1546 ๏ธ Y1 = j 2๏ฐ ( 60 )1.265 ๏ด 10 −11 (1000 ) = 4.77 ๏ด 10 −6 S/km Q1 = ( 500 ) 4.77 ๏ด 10 −6 = 1.192 MVAR/ km 2 78 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. C1,Y1, and Q1 increase 0.8% (decrease 0.7%) For the larger, 1351 kcmil conductors (smaller, 700 kcmil conductors). 4.43 (a) For Drake, Table A.4 lists the outside diameter as 1.108 in ๏ r= 1.108 = 0.0462 ft 2 ๏ด 12 Deq = 3 20 ๏ด 20 ๏ด 38 = 24.8ft Can = 2๏ฐ ๏ด 8.85 ๏ด 10 −12 = 8.8466 ๏ด 10 −12 F/m ln ( 24.8 / 0.0462 ) XC = 1012 = 0.1864 ๏ด 106 ๏ ๏ mi 2๏ฐ (60)8.8466 ๏ด 1609 (b) For a length of 175 mi 0.1864 ๏ด 106 = 1065 ๏ to neutral 175 220 ๏ด 103 1 0.22 I chg = = = 0.681A/mi XC 3 3 ๏ด 0.1864 Capacitive reactance = or 0.681๏ด175 = 119A for the line Total three-phase reactive power supplied by the capacitance is given by 3 ๏ด 220 ๏ด 119 ๏ด 10 −3 = 43.5MVAR 4.44 ๏ฆ 51.87 ๏ถ C = 0.0389 log ๏ง ๏ท = 0.0212 ๏ญ F /mi/ph ๏จ 0.7561 ๏ธ ๏ฉ Note: Equivalent radius of a 4-cond. bundle is given by ๏น ๏ช ๏บ 3 1/ 4 3 1/ 4 ๏ซ๏ช 1.091( 0.0498 d ) = 1.091( 0.0498 ๏ด 1.667 ) = 0.7561ft ๏ป๏บ XC = 1 = 125.122 ๏ด 103 ๏ ๏ mi ๏ฌ −6 2๏ฐ ( 60 ) 0.0212 ๏ด 10 79 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 4.45 From Example 4.8, 2๏ฐ๏ฅ 0 C Xn = = ๏ฆD๏ถ ๏ฆ HXY ๏ถ Ln ๏ง ๏ท − Ln ๏ง ๏ท ๏จ๏๏ธ ๏จ HXX ๏ธ C Xn = 1.3247 ๏ด 10 −11 2๏ฐ ( 8.854 ๏ด 10 −12 ) ๏ฆ 0.5 ๏ถ ๏ฆ 20.006 ๏ถ Ln ๏ง − Ln ๏ง ๏ท ๏ท ๏จ 0.0075 ๏ธ ๏จ 20 ๏ธ F which is 0.01% larger than in Problem 4.32 m 4.46 (a) Deq = 3 12 ๏ด 12 ๏ด 24 = 15.12m r = 0.0328 / 2 = 0.0164 m XC = Where 1 2๏ฐ fCan 2๏ฐ ๏ด 8.85 ๏ด 10 −12 ln (15.12 / 0.0164 ) Can = ๏ XC = 2.86 15.12 ๏ด 10 9 ln = 3.254 ๏ด 108 ๏ ๏ m 60 0.016 ๏ For 125 km, XC = 3.254 ๏ด 108 = 2603 ๏ 125 ๏ด 1000 (b) H1 = H2 = H3 = 40m H12 = H23 = 402 + 122 = 41.761m H31 = 402 + 242 = 46.648m Deq = 15.12 m and r = 0.0164 m 80 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ XC = ๏ฉ Deq 1 H12 H 23 H31 ๏น 2.86 ๏ด 10 9 ๏ช ln − ln ๏บ๏๏m 60 3 H1 H 2 H3 ๏ป ๏ซ r ๏ฉ 15.12 1 41.761 ๏ด 41.761 ๏ด 46.648 ๏น = 4.77 ๏ด 107 ๏ช ln − ln ๏บ 40 ๏ด 40 ๏ด 40 ๏ซ 0.0164 3 ๏ป 8 = 3.218 ๏ด10 ๏ ๏ m For 125 km, XC = 3.218 ๏ด 108 = 2574 ๏ 125 ๏ด 103 4.47 D = 10 ft; r = 0.06677 ft; Hxx = 160 ft.; H xy = 1602 + 102 = 160.3ft (See Fig. 4.24 of text) Line-to-line capacitance C xy = ๏ฐ๏ฅ H D ln − ln xy r H xx F/ m (See Ex. 4.8 of the text) C xy = ๏ฐ ( 8.854 ๏ด 10 −12 ) ๏ฆ 10 ๏ถ ๏ฆ 160.3 ๏ถ ln ๏ง ๏ท − ln ๏ง 160 ๏ท 0.06677 ๏จ ๏ธ ๏จ ๏ธ Neglecting Earth effect, C xy = = 5.555 ๏ด 10 −12 F/ m ๏ฐ ( 8.854 ๏ด 10 −12 ) ๏ฆ 10 ๏ถ ln ๏ง ๏ท ๏จ 0.06677 ๏ธ = 5.553 ๏ด 10 −12 F/ m Error - percentage = 5.555 − 5.553 ๏ด 100 = 0.036% 5.555 When the phase separation is doubled, D = 20 ft H xy = 1602 + 202 = 161.245 With effect of Earth, C xy = ๏ฐ ( 8.854 ๏ด 10 −12 ) ๏ฆ 20 ๏ถ ๏ฆ 161.245 ๏ถ ln ๏ง − ln ๏ง ๏ท ๏ท ๏จ 0.06677 ๏ธ ๏จ 160 ๏ธ = 4.885 ๏ด 10−12 F/m 81 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Neglecting Earth effect, C xy = ๏ฐ ( 8.854 ๏ด 10 −12 ) ๏ฆ 20 ๏ถ ln ๏ง ๏ท ๏จ 0.06677 ๏ธ = 4.878 ๏ด 10−12 F/ m Error percentage = 4.885 − 4.878 ๏ด 100 = 0.143% 4.885 4.48 (a) H1 = H2 = H3 = 2 ๏ด 50 = 100 ft H12 = H 23 = 252 + 100 2 = 103.08ft H13 = 50 2 + 100 2 = 111.8ft Deq = 3 ( 25 )( 25 )( 50 ) = 31.5ft r= Can = 1.065 = 0.0444 ft 2 ๏ด 12 2๏ฐ ( 8.854 ๏ด 10 −12 ) ๏ฆ 31.5 ๏ถ ๏ฆ 106 ๏ถ ln ๏ง − ln ๏ง ๏ท ๏ท ๏จ 0.0444 ๏ธ ๏จ 100 ๏ธ = 9.7695 ๏ด 10 −12 F/ m ๏ฌ ๏ฉ Note : H m = (103.08 ๏ด 103.08 ๏ด 111.8)1/ 3 = 106ft ๏น ๏ช ๏บ H s = 100ft ๏ช๏ซ ๏บ๏ป (b) Neglecting the effect of ground, Can = 2๏ฐ ( 8.854 ๏ด 10 −12 ) ๏ฆ 31.5 ๏ถ ln ๏ง ๏ท ๏จ 0.0444 ๏ธ = 8.4746 ๏ด 10 −12 F/ m Effect of ground gives a higher value. Error percent = 4.49 9.7695 − 8.4746 ๏ด 100 = 13.25% 9.7695 GMD = ( 60 ๏ด 60 ๏ด 120 ) 1/ 3 r= or = 75.6ft 1.16 ๏ฐ = 0.0483ft; N = 4; S = 2 A sin 2 ๏ด 12 N A= 18 = 1.0608ft ( 2sin 45๏ฐ )12 82 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. N −1 GMR = ๏ฉrN ( A ) ๏น ๏ซ ๏ป ๏ Can = 1/ N 3 1/ 4 = ๏ฉ0.0483 ๏ด 4 ๏ด (1.0608 ) ๏น ๏ซ ๏ป = 0.693ft 2๏ฐ ( 8.854 ๏ด 10 −12 ) ๏ฆ 75.6 ๏ถ ln ๏ง ๏ท ๏จ 0.693 ๏ธ = 11.856 ๏ด 10 −12 F/m ๏ฌ Next X d๏ข = 0.0683log ( 75.6 ) = 0.1283 ๏ฆ 1 ๏ถ X a๏ข = 0.0683log ๏ง ๏ท = 0.0109 ๏จ 0.693 ๏ธ X c = X a๏ข + X d๏ข = 0.1392 M ๏ ๏ mi to neutral = 0.1392 ๏ด 106 ๏ ๏ mi to neutral ๏ฌ 4.50 From Problem 4.45 1 1 F C xy = C xn = (1.3247 ๏ด 10−11 ) = 6.6235 ๏ด 10−12 2 2 m with Vxy = 20 kV Qx = C xy Vxy = ( 6.6235 ๏ด 10−12 )( 20 ๏ด 103 ) = 1.3247 ๏ด 10−7 C m From Eq (4.12.1) The conductor surface electric field strength is: ET = 1.3247 ๏ด 10 −7 ( 2๏ฐ ) (8.854 ๏ด 10 −12 ) ( 0.0075 ) = 3.1750 ๏ด 10 5 = 3.175 V ๏ฆ kV ๏ถ๏ฆ m ๏ถ ๏ด ๏ท m ๏ง๏จ 1000 V ๏ท๏ง ๏ธ๏จ 100 cm ๏ธ kVrms cm Using Eq (4.12.6), the ground level electric field strength directly under the conductor is: ๏ฉ ( 2 )(10 ) ( 2 )(10 ) ๏น๏บ 1.3247 ๏ด 10 −7 ๏ช − 2 −12 ( 2๏ฐ ) (8.854 ๏ด 10 ) ๏ช๏ซ (10 ) (10 )2 + ( 0.5)2 ๏บ๏ป V ๏ฆ kV ๏ถ kV = 1.188 ๏ด ๏ง = 0.001188 ๏ท m ๏จ 1000 V ๏ธ m Ek = 83 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 4.51 (a) From Problem 4.30, 2๏ฐ ( 8.854 ๏ด 10 −12 ) C xn = ๏ฆ 0.5 ๏ถ ๏ฆ 20.006 ๏ถ Ln ๏ง − Ln ๏ง ๏ท ๏ท ๏จ 0.009375 ๏ธ ๏จ 20 ๏ธ 1 F C xy = C xn = 6.995 ๏ด 10 −12 2 m = 1.3991 ๏ด 10 −11 F m Qx = C xy Vxy = ( 6.995 ๏ด 10 −12 )( 20 ๏ด 103 ) = 1.399 ๏ด 10 −7 E๏ = c m 1.399 ๏ด 10 −7 ๏ฆ 1 ๏ถ๏ฆ 1 ๏ถ ๏ด๏ง ๏ท −12 ( 2๏ฐ ) (8,854 ๏ด 10 ) ( 0.009375 ) ๏จ 1000 ๏ท๏ง ๏ธ๏จ 100 ๏ธ = 2.682 kVrms cm ๏ฉ ( 2 )(10 ) ( 2 )(10 ) ๏น๏บ 1.399 ๏ด 10 −7 ๏ช − 2 ( 2๏ฐ ) (8.854 ๏ด 10 −12 ) ๏ช๏ซ (10 ) (10 )2 + ( 0.5 )2 ๏บ๏ป V ๏ฆ kV ๏ถ kV = 1.254 ๏ด ๏ง = 0.001254 ๏ท m ๏จ 1000 V ๏ธ m Ek = (b) C xn = 2๏ฐ ( 8.854 ๏ด 10 −12 ) ๏ฆ 0.5 ๏ถ ๏ฆ 20.06 ๏ถ Ln ๏ง − Ln ๏ง ๏ท ๏ท ๏จ .005625 ๏ธ ๏จ 20 ๏ธ = 1.2398 ๏ด 10 −11 F m 1 F C xy = C xn = 6.199 ๏ด 10 −12 2 m Qx = C xy Vxy = ( 6.199 ๏ด 10 −12 )( 20 ๏ด 103 ) = 1.2398 ๏ด 10 −7 E๏ = c m 1.2398 ๏ด 10 −7 ๏ฆ 1 ๏ถ๏ฆ 1 ๏ถ ๏ด๏ง ๏ท −12 ( 2๏ฐ ) (8.854 ๏ด 10 ) (.005625) ๏จ 1000 ๏ท๏ง ๏ธ๏จ 100 ๏ธ E๏ = 3.962 kVrms cm ๏ฉ ( 2 )(10 ) ( 2 )(10 ) ๏น๏บ 1.2398 ๏ด 10 −7 ๏ช − 2 ( 2๏ฐ ) (8.854 ๏ด 10 −12 ) ๏ช๏ซ (10 ) (10 )2 + ( 0.5)2 ๏บ๏ป V ๏ฆ kV ๏ถ kV Ek = 1.112 ๏ด ๏ง = 0.001112 ๏ท m ๏จ 1000 V ๏ธ m Eq = The conductor surface electric field strength E๏ decreases 15.5 % (increases 24.8%) as the conductor diameter increases 25 % (decreases 25%). The ground level electric field strength Ek increases 5.6 %( decreases 6.4%). 84 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Chapter 5 Transmission Lines: Steady-State Operation 5.1 A = D = 1.0๏0๏ฐ pu; C = 0. S (a) B = Z = ( 0.19 + j 0.34 ) 30 = 11.685๏60.8๏ฐ ๏ (b) VR = IR = 33 3 ๏0๏ฐ = 19.05๏0๏ฐ kVLN SR ๏ − cos−1 ( pf ) 3 VR L - L = 10 3(33) ๏ − cos−1 ( 0.9 ) = 0.175๏ − 25.84๏ฐ kA VS = AVR + B I R = (1.0 )(19.05) + (11.685๏60.8๏ฐ )( 0.175๏ − 25.84๏ฐ ) = 20.73 + j1.17 = 20.76๏3.236๏ฐ kVL − N VSL-L = 20.76 3 = 35.96 kV (c) I R = 0.175๏25.84๏ฐ VS = AVR + B I R = (1.0 )(19.05) + (11.685๏60.8๏ฐ )( 0.175๏25.84๏ฐ ) = 19.17 + j 2.04 = 19.28๏6.078๏ฐ kVL − N VS L−L = 19.27 3 = 33.4kV 5.2 Y Z 1 = 1 + ( 3.33 ๏ด 10−6 ๏ด 200๏90๏ฐ ) ( 0.08 + j 0.48 )( 200 ) 2 2 = 1 + ( 0.0324 ๏170.5๏ฐ ) = 0.968 + j 0.00533 = 0.968๏0.315๏ฐ pu (a) A = D = 1 + ๏ฆ Y Z ๏ถ −4 C = Y ๏ง1 + ๏ท = ( 6.66 ๏ด 10 ๏90๏ฐ ) (1 + .0.0162 ๏170.5๏ฐ ) 4 ๏ธ ๏จ = 6.553 ๏ด 10 −4 ๏90.155๏ฐ S B = Z = 97.32 ๏80.54๏ฐ ๏ (b) VR = 220 ๏0๏ฐ = 127๏0๏ฐ kVL − N 3 P ๏ − cos−1 ( pf ) 250๏ − cos−1 0.99 IR = R = = 0.6627๏ − 8.11๏ฐ kA 3VR L−L ( pf ) 3 ( 220 )( 0.99 ) VS = AVR + B I R = ( 0.968๏0.315๏ฐ )(127๏0๏ฐ ) + ( 97.32๏80.54๏ฐ )( 0.6627๏ − 8.11๏ฐ ) = 142.4 + j 62.16 = 155.4๏23.58๏ฐ kVL− N VS L−L = 155.4 3 = 269.2 kV 85 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. I S = CVR + D I R = ( 6.553 ๏ด 10−4 ๏90.155๏ฐ ) (127 ) + ( 0.968๏ − 0.315๏ฐ )( 0.6627๏ − 8.11๏ฐ ) = 0.6353 − j 3.786 ๏ด 10−3 = 0.6353๏ − 0.34๏ฐ kA (c) VRNL = VS A = 269.2 0.968 = 278.1kVLL % VR = 5.3 VR NL − VR FL VR FL ๏ฆ 278.1 − 220 ๏ถ ๏ด 100 = ๏ง ๏ท100 = 26.4% 220 ๏จ ๏ธ Z base = V 2base Sbase = ( 230 ) 1000 = 52.9 ๏ 2 Ybase = 1 Z base = 1.89 ๏ด 10−2 S (a) A = D = 0.9680 ๏0.315 pu B = ( 97.32 ๏80.54๏ฐ๏ ) 52.9 ๏ = 1.84๏80.54๏ฐ pu C = ( 6.553 ๏ด 10−4 ๏90.155 S) (1.89 ๏ด 10 −2 S ) = 0.03467๏90.155๏ฐ pu (b) I base = Sbase 3๏ฆ 3๏ข Vbase L − L 1000 = 2.51 kA 3๏ข (230) = VRpu = ( 220 230 ) ๏0๏ฐ = 0.9565๏0๏ฐ I Rpu = ( 0.6627 ๏ − 8.11๏ฐ ) 2.51 = 0.264๏ − 8.11๏ฐ VSPU = APU VRPU + BPU I RPU = ( 0.968 ๏0.315๏ฐ )( 0.9565 ๏0๏ฐ ) + (1.84 ๏80.54๏ฐ )( 0.264 ๏ − 8.11๏ฐ ) = 1.0725 + j 0.4682 = 1.17๏23.58๏ฐ pu; VS = 1.17 pu I SPU = CPU VRPU + DPU I RPU = ( 0.03467 ๏90.155๏ฐ )( 0.9565๏0๏ฐ ) + ( 0.968๏0.315๏ฐ )( 0.264๏ − 8.11๏ฐ ) = 0.2531 − j 0.0015 = 0.2531๏ − 0.34๏ฐ pu; I S = 0.2531 pu (c) VRNLpu = VSpu Apu = 1.17 0.968 = 1.209 %VR = VRNLpu − VRFLpu VRFLpu ๏ฆ 1.209 − 0.9565 ๏ถ ๏ด 100 = ๏ง ๏ท100 = 26.4% 0.9565 ๏จ ๏ธ 5.4 ๏ฉVS ๏น ๏ฉ A1 ๏ช ๏บ=๏ช ๏ซ๏ช I S ๏ป๏บ ๏ซC1 B1 ๏น ๏ฉVx ๏น ๏ฉ A1 ๏บ๏ช ๏บ = ๏ช D1 ๏ป ๏ซ๏ช I x ๏ป๏บ ๏ซC1 ๏ฉVS ๏น ๏ฉ( A1 A2 + B1C2 ) ๏ช ๏บ=๏ช ๏ซ๏ช I S ๏ป๏บ ๏ช๏ซ( C1 A2 + D1C2 ) B1 ๏น ๏ฉ A2 ๏บ๏ช D1 ๏ป ๏ซC2 B2 ๏น ๏ฉVR ๏น ๏บ๏ช ๏บ D2 ๏ป ๏ซ I R ๏ป ( A B + B D ) ๏น๏บ ๏ฉV ๏น (C B + D D )๏บ๏ป ๏ช๏ซ I ๏บ๏ป 1 2 1 2 R 1 2 1 2 R 86 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 5.5 KCL : I S = I R + Y (VR + Z 2 I R ) = Y VR + (1 + Y Z 2 ) I R KVL : VS = VR + Z 2 I R + Z1 I S = VR + Z 2 I R + Z1 ๏ฉ๏ซY VR + (1 + Y Z 2 ) I R ๏น๏ป = (1 + Y Z1 ) VR + ( Z1 + Z 2 + Y Z1 Z 2 ) I R In matrix format: ๏ฉVS ๏น ๏ฉ(1 + Y Z1 ) ๏ช ๏บ=๏ช Y ๏ซ๏ช I S ๏ป๏บ ๏ช๏ซ 5.6 ( Z + Z + Y Z Z )๏น ๏ฉV ๏น ๏บ (1 + Y Z ) ๏บ๏ป ๏ช๏ซ I ๏บ๏ป 1 2 1 2 2 R R (a) VR is taken as reference; I = I R + I CR ; I S = I + I CS ; I CR ⊥ VR (Leading); I CS ⊥ VS (Leading); VR + IR + jIX L = VS ( IR) I ; ( jIX L ) ⊥ I (b) (i) ๏ฆ R jX ๏ถ I S = I R + I C ; VC = VR + I R ๏ง + L ๏ท ; I C ⊥ VC (Leading) 2 ๏ธ ๏จ2 ๏ฆ R jX ๏ถ VS = VC + I S ๏ง + L ๏ท ; VR is taken as reference. 2 ๏ธ ๏จ2 87 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (ii) For nominal T-circuit 1 ๏ฆ 1 ๏ถ A = 1 + Y Z = D; B = Z ๏ง 1 + Y Z ๏ท ; C = Y ๏ฌ 2 4 ๏จ ๏ธ For nominal ๏ฐ-circuit of part (a) 1 ๏ฆ 1 ๏ถ A = D = 1 + Y Z ; B = Z ; C = Y ๏ง1 + Y Z ๏ท ๏ฌ 2 4 ๏จ ๏ธ 5.7 VS = 3300 = 1905.3V (Line-to-neutral) 3 0.5๏53.13๏ฐ = 0.5 ( 0.6 + j 0.8 ) = 0.3 + j 0.4 I= (1200 / 3)103 = 500 ๏ด 103 A 0.8 ๏ด VR VR From the phasor diagram drawn below with I as reference, VS2 = (VR cos ๏ฆR + IR ) + (VR sin ๏ฆR + IX ) 2 2 (1) 2 ๏ฆ 500 ๏ด 103 ๏ด 0.3 ๏ถ ๏ฆ 500 ๏ด 103 ๏ด 0.4 ๏ถ (1905.3) = ๏ง 0.8VR + ๏ท + ๏ง 0.6VR + ๏ท VR VR ๏จ ๏ธ ๏จ ๏ธ 2 2 From which one gets VR = 1769V (a) Line-to-line voltage at receiving end = 1769 3 = 3064 V ๏ฌ = 3.064 kV (b) Line current is given by I= 500 ๏ด 103 = 282.6 A ๏ฌ 1769 88 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 5.8 (a) From phasor diagram of Problem 5.7 solution, VR cos ๏ฆR + IR = 1769 ( 0.8 ) + ( 282.6 ๏ด 0.3) = 1500 V Sending-End PF = 1500 1500 = = 0.786 Lagging ๏ฌ VS 1905.3 (b) Sending-End 3-Phase Power = PS = 3 (1905.3)( 282.6 ) 0.786 = 1272 kW ๏ฌ (c) Three-Phase Line Loss = 1272 − 1200 = 72 kW ๏ฌ or 3 ( 282.6 ) 0.3 = 72 kW 2 5.9 (a) From Table A.4, ๐ = 0.1128 Ω/mi = 0.0701 Ω/km ๐งฬ = 0.0701 + ๐0.497 = 0.502∠81.97°Ω/km; ๐ฆฬ = 3.30 × 10−6 ∠90° s/km ฬ ฬ ฬ = 1 + ๐๐ = 1 + 1 (3.22 × 10−6 × 100∠90°)(0.513 × 100∠82.14°) = ๐ดฬ = ๐ท 2 2 0.9918∠0.0999° ๐ตฬ = ๐ฬ = ๐งฬ ๐ = 0.513 × 100∠82.14° = 51∠82.11° Ω ฬ ฬ ๐๐ ๐ถฬ = ๐ฬ (1 + ) = (3.22 × 10−4 ∠90°)[1 + 0.004130∠172.14°] 4 218 ๐ฬ ๐ = 3 ∠0° = 125.9∠0° kV๐ฟ๐ √ 300 ๐ผ๐ ฬ = 218 3 ∠(− cos −1 0.9) = 0.7945∠ − 25.84° kA √ ๐ฬ ๐ = ๐ดฬ ๐ฬ ๐ + ๐ตฬ ๐ผ๐ ฬ = 0.9918∠0.999 (125.9) + 51∠82.11° (0.7945∠-25.84°) ๐๐ = 151.3√3 = 262 kVLL ๐ 262 ๐๐ ๐๐ฟ = ๐ด๐ = 0.9918 = 264.2 kVLL %๐๐ = ๐๐ ๐๐ฟ −๐๐ ๐น๐ฟ 264.2−218 = 218 = 21.2% ๐๐ ๐น๐ฟ (b) ๐ผ๐ ฬ = 0.7945∠0° kA ๐ฬ ๐ = ๐ดฬ ๐ฬ ๐ + ๐ตฬ ๐ผ๐ ฬ = 0.9918∠0.999 (125.9) + 51∠82.11° (0.7945∠0°) ๐๐ = 136.6√3∠17.2° = 238.6 kVLL %๐๐ = ๐๐ ๐๐ฟ −๐๐ ๐น๐ฟ 238.6−218 = 218 = 9.43% ๐๐ ๐น๐ฟ (c) ๐ผ๐ ฬ = 0.7945∠25.84° kA ๐ฬ ๐ = ๐ดฬ ๐ฬ ๐ + ๐ตฬ ๐ผ๐ ฬ = 0.9918∠0.999 (125.9) + 51∠82.11° (0.7945∠25.84°) = 118.9∠19.1° kVLN 89 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๐๐ = 118.9√3 = 205.9 kVLL %๐๐ = ๐๐ ๐๐ฟ −๐๐ ๐น๐ฟ 205.9−218 = 218 = −5.6% ๐๐ ๐น๐ฟ 1 Ω Ω 5.10 From Table A.4, R=3 (0.0969) mi = 0.0201 km From problems 4.20 and 4.41, ๐งฬ = 0.0201 + ๐0.531 = 0.531∠87.8° Ω/km ๐ฆฬ = 4.807 × 10−6 ∠90° S/km ฬ ฬ ฬ = 1 + ๐๐ = 1 + 1 (0.531 × 180∠87.8°)(4.807 × 10−6 × 180∠90°) = 0.9587∠0.0936° pu (a) ๐ดฬ = ๐ท 2 2 ๐ตฬ = ๐ฬ = ๐งฬ โ = 0.531 (180)∠87.8° = 95.58∠87.8° Ω ฬ ฬ ๐๐ ๐ถฬ = ๐ฬ (1 + 4 ) = (4.806 × 10−6 × 180∠90°)(1 + 0.0207∠177.8°) = 8.47 × 10−4 ∠90.05° S (b) ๐ฬ ๐ = ๐ผ๐ ฬ = 475 ∠0° = 274.24∠0°kV๐ฟ๐ √3 ๐๐ ∠ cos−1(๐๐) 1600∠ cos−1 0.95 = 3 475 (0.95) = 2.047∠18.19° kA (๐๐) 3 ๐ √ ๐ ๐ฟ๐ฟ √ ๐ฬ ๐ = ๐ดฬ ๐ฬ ๐ + ๐ตฬ ๐ผ๐ ฬ = (0.9587∠0.0936° pu)(274.24∠0° kVLN ) + (95.58∠87.8° Ω)(2.047∠18.19°) = 281.5∠42.05° kVLN = 487.6∠42.05° kVLL ฬ ๐ผ๐ ฬ = (8.47 × 10−4 ∠90.05°)(274.24) + (95.58∠87.8°Ω)(2.047∠18.19°) = ๐ผ๐ฬ = ๐ถฬ ๐ฬ ๐ + ๐ท 2.047∠24.47° kA (c) ๐๐ฬ = ๐ฬ ๐ ๐ผ๐∗ฬ = (487.6∠42.05° kVLL × √3)(2.047∠24.47°)∗ = 1648 + ๐522 p.f. = cos[tan-1(522/1648)] = 0.95 lagging (d) Full-load line losses = ๐๐ − ๐๐ = 1648 − 1600 = 48 MW ๐ 1600 Efficiency = ( ๐๐ ) = 1648 = 97.1% ๐ ๐ 487.6 (e) ๐๐ ๐๐ฟ = ๐ด๐ = 0.9587 = 508.6 kVLL %VR = ๐๐ ๐๐ฟ −๐๐ ๐น๐ฟ 508.6−475 = 475 = +7.1% ๐๐ ๐น๐ฟ 5.11 (a) The series impedance per phase Z = ( r + j๏ท L ) l = ( 0.15 + j 2๏ฐ (60)1.3263 ๏ด 10−3 ) 40 = 6 + j20 ๏ The receiving end voltage per phase VR = 220 3 ๏0๏ฐ = 127๏0๏ฐ kV Complex power at the receiving end SR(3๏ฆ ) = 381๏ cos−1 0.8MVA = 304.8 + j 228.6 MVA The current per phase is given by S R* (3๏ฆ ) 3VR* 90 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏IR = ( 381๏ − 36.87๏ฐ)103 = 1000๏ − 36.87๏ฐ A 3 ๏ด 127๏0๏ฐ The sending end voltage, as per KVL, is given by VS = VR + Z I R = 127๏0๏ฐ + ( 6 + j 20 )(1000๏ − 36.87๏ฐ )10 −3 = 144.33๏4.93๏ฐ kV The sending end line-to-line voltage magnitude is then VS ( L − L ) = 3 (144.33) = 250 kV The sending power is SS (3๏ฆ ) = 3VS I S* = 3 (144.33๏4.93๏ฐ )(1000๏36.87๏ฐ )10 −3 = 322.8MW+ j 288.6 MVAR = 433๏41.8๏ฐ MVA 250 − 220 = 0.136 220 P (3๏ฆ ) 304.8 Transmission line efficiency is ๏จ = R = = 0.944 PS (3๏ฆ ) 322.8 Voltage regulation is (b) With 0.8 leading power factor, I R = 1000๏36.87๏ฐ A The sending end voltage is VS = VR + Z I R = 121.39๏9.29๏ฐ kV The sending end line-to-line voltage magnitude VS ( L − L ) = 3 ๏ด 121.39 = 210.26 kV The sending end power SS (3๏ฆ ) = 3V I * S S = 3 (121.39๏9.29๏ฐ )(1๏ − 36.87๏ฐ ) = 322.8 MW − j168.6 M var = 364.2๏ − 27.58๏ฐ MVA 210.26 − 220 = −0.0443 220 PR (3๏ฆ ) 304.8 = = 0.944 Transmission line efficiency ๏จ = PS (3๏ฆ ) 322.8 Voltage regulation = 5.12 (a) The nominal ๏ฐ circuit is shown below: The total line impedance Z = ( 0.1826 + j 0.784 )100 = 18.26 + j 78.4 = 80.5๏76.89๏ฐ ๏ /ph. The line admittance for 100 mi is 91 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Y= (b) VR = IR = 230 3 1 1 ๏90๏ฐ = ๏90๏ฐ = 0.5391 ๏ด 10 −3 ๏90๏ฐ S/ph. 185.5 ๏ด 103 XC 100 ๏0๏ฐ = 132.8๏0๏ฐ kV 200 ๏ด 103 3 ( 230 ) ๏0๏ฐ = 502๏0๏ฐ A ( Unity Power Factor ) ๏ฆY ๏ถ I Z = I R + VR ๏ง ๏ท = 502๏0๏ฐ + (132,800๏0๏ฐ ) ( 0.27 ๏ด 10 −3 ๏90๏ฐ ) ๏จ2๏ธ = 502 + j 35.86 = 503.3๏4.09๏ฐ A The sending end voltage VS = 132.8๏0๏ฐ + ( 0.5033๏4.09๏ฐ )( 80.5๏76.89๏ฐ ) = 139.152 + j 40.01 = 144.79๏16.04๏ฐ kV The line-to-line voltage magnitude at the sending end is 3 (144.79) = 250.784 kV ๏ฆY ๏ถ I S = I Z + VS ๏ง ๏ท = 502 + j 35.86 + (144.79๏16.04๏ฐ )( 0.27๏90๏ฐ ) ๏จ2๏ธ = 491.2 + j 73.46 = 496.7๏8.5๏ฐ A Sending end power SS (3๏ฆ ) = 3 (144.79)(0.4967 ) ๏16.04๏ฐ − 8.5๏ฐ = 213.88 + j 28.31MVA So PS (3๏ฆ ) = 213.88 MW; QS (3๏ฆ ) = 28.31MVAR (c) Regulation = 5.13 VS − VR 144.79 − 132.8 = = 0.09 VR 132.8 ๏ง l = 0.4๏85๏ฐ = 0.034862 + j 0.39848 e๏ง l = e0.034862 e j 0.39848 = 1.03548๏0.39848 radians = 0.9543 + j 0.40178 e −๏ง l = e −0.034862 e − j 0.39848 = 0.965738๏ − 0.39848 radians = 0.89007 − j 0.37472 cosh ๏ง l = e๏ง l + e − ๏ง l = ๏ฉ๏ซ( 0.9543 + j 0.40178 ) + ( 0.89007 − j 0.37472 )๏น๏ป 2 2 = 0.92219 + j 0.01353 = 0.9223๏0.841๏ฐ pu Alternatively: 92 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. cosh ( 0.034862 + j 0.39848 ) = cosh ( 0.034862 ) cos ( 0.39848 radians ) + j sinh ( 0.034862 ) sin ( 0.39848 radians ) = (1.00060 )( 0.92165 ) + j (0.034869) ( 0.388018 ) = 0.9222 + j 0.01353 = 0.9223 ๏0.841๏ฐ pu e๏ง l − e − ๏ง l = ๏ฉ๏ซ( 0.9543 + j 0.40178 ) − ( 0.89007 − j 0.37472 ) ๏น๏ป 2 2 = 0.03212 + j 0.38825 = 0.38958 ๏85.271๏ฐ pu sinh ๏ง l = ๏ฆ ๏ง l ๏ถ cosh ( ๏ง l ) − 1 ( 0.9222 + j 0.01353 ) − 1 tanh ๏ง ๏ท = = sinh ( ๏ง l ) 0.38958 ๏85.271๏ฐ ๏จ 2 ๏ธ 0.07897 ๏170.13๏ฐ = 0.2027 ๏84.86๏ฐ pu 0.38958๏85.271๏ฐ = 5.14 (a) ZC = z 0.03 + j 0.35 = = 282.6๏ − 2.45๏ฐ ๏ y 4.4 ๏ด 10 −6 ๏90๏ฐ (b) ๏ง l = z y (l ) = ( 0.35128๏85.101๏ฐ ) ( 4.4 ๏ด 10−6 ๏90๏ฐ ) ( 500 ) = 0.622๏87.55๏ฐ = 0.02657 + j 0.6210 pu (c) A = D = cosh ๏ง l = cosh ( 0.02657 + j 0.6210 ) = ( cosh 0.02657 )( cos 0.6210 radians ) + j ( sinh 0.02657 )( sin 0.6210 radians ) = (1.00035 )( 0.8133) + j ( 0.02657 )( 0.5818 ) = 0.8136 + j 0.015458 = 0.8137 ๏1.09๏ฐ pu sinh ๏ง l = sinh ( 0.02657 + j 0.6210 ) = sinh ( 0.02657 ) cos ( 0.6210 radians ) + j ( cosh 0.02657 )( sin 0.6210 radians ) = (0.02657)(0.8133) + j (1.0004)(0.5818) = 0.0216 + j 0.5820 = 0.5824๏87.88๏ฐ B = ZC sinh ( ๏ง l ) = ( 282.6๏ − 2.45๏ฐ )( 0.5824๏87.88๏ฐ ) = 164.6 ๏85.43๏ฐ๏ C= 5.15 ( VR = 475 IR = 1 0.5824 ๏87.88๏ฐ sinh ( ๏ง l ) = = 2.061๏ด 10−3 ๏90.3๏ฐ S ZC 282.6 ๏ − 2.45๏ฐ ) 3 ๏0๏ฐ = 274.2๏0๏ฐ kVL − N PR ๏ cos −1 ( pf ) 3 VR LL ( pf ) = 900๏ cos −1 1.0 3 ( 475 )(1.0 ) = 1.094๏0๏ฐ kA (a) VS = AVR + B I R = ( 0.8794 ๏0.66๏ฐ )( 274.2 ๏0๏ฐ ) + (134.8๏85.3๏ฐ )(1.094๏0๏ฐ ) = 241.13 ๏0.66๏ฐ + 147.47 ๏85.3๏ฐ = 253.2 + j149.8 = 294.17๏30.60๏ฐ kVL − N 93 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. VS L − L = 294.17 3 = 509.5 kV (b) I S = CVR + D I R = (1.688 ๏ด10−3 ๏90.2๏ฐ ) ( 274.2 ๏0๏ฐ ) + ( 0.8794๏0.66๏ฐ )(1.094๏0๏ฐ ) = 0.4628๏90.2๏ฐ + .9621๏0.66๏ฐ = .9604 + j 0.4739 = 1.071๏26.26๏ฐ kA I S = 1.071 kA (c) PFS = cos ( 32.67 − 24.01) = cos ( 6.41๏ฐ ) = 0.994 Lagging (d) PS = 3 VS LL I S ( pf S ) = 3 ( 509.5)(1.071)( 0.994) = 939.5 MW Full-load line losses = PS − PR = 939.5 − 900 = 39.5MW (e) VR NL = VS / A = 509.5 / 0.8794 = 579.4 kVL − L % VR = VR NL − VR FL VR FL ๏ด 100 = 579.4 − 475 = 22% 475 5.16 Table A.4 three ACSR finch conductors per phase r= (a) ZC = z / y = 0.0969 ๏ ๏ฆ 1 mi ๏ถ ๏ง ๏ท = 0.02 ๏ / km 3 mi ๏จ 1.609 km ๏ธ 0.336๏86.6๏ฐ = 264.4๏ − 1.7๏ฐ ๏ 4.807 ๏ด 10 −6 ๏90๏ฐ (b) ๏ง l = z y l = 0.336 ๏ด 4.807 ๏ด 10−6 ๏86.6๏ฐ + 90๏ฐ ( 300 ) = 0.0113 + j 0.381 pu (c) A = D = cosh ( ๏ง l ) = cosh ( 0.0113 + j 0.381) = cosh 0.0113 cos0.381+ j sinh 0.0113 sin 0.381 rad. rad. = 0.9285 + j 0.00418 = 0.9285๏0.258๏ฐ pu sinh ๏ง l = sinh ( 0.0113 + j 0.381) = sinh 0.0113 cos 0.381+ j cosh 0.0113 sin 0.381 rad. rad. = 0.01045 + j 0.3715 = 0.3716๏88.39๏ฐ B = ZC sinh ๏ง l = 264.4๏ − 1.7๏ฐ ( 0.3716๏88.39๏ฐ ) = 98.25๏86.69๏ฐ๏ C = sinh ๏ง l / ZC = 0.3716๏88.39๏ฐ ( 264.4๏ − 1.7๏ฐ ) = 1.405 ๏ด 10−3 ๏90.09๏ฐ S 94 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 5.17 ( ) VR = 480 / 3 ๏0๏ฐ = 277.1๏0๏ฐ kVLN (a) I R = 1500 480 3 ๏ − cos−1 0.9 = 1.804๏ − 25.84๏ฐ kA VS = AVR + B I R = 0.9285๏0.258๏ฐ ( 277.1) + 98.25๏86.69๏ฐ (1.804๏ − 25.84๏ฐ ) = 377.4๏24.42๏ฐ kVLN ; VS = 377.4 3 = 653.7kVLL VRNL = VS / A = 653.7 / 0.9285 = 704 kVLL % VR = VR NL − VR FL VR FL ๏ด 100 = 704 − 480 ๏ด 100 = 46.7% 480 (b) VS = 0.9285๏0.258๏ฐ ( 277.1) + 98.25๏86.69๏ฐ (1.804๏0๏ฐ ) = 321.4๏33.66๏ฐ kVLN ; VS = 321.4 3 = 556.7kVLL VR NL = VS / A = 556.7 / 0.9285 = 599.5 kVLL % VR = 599.5 − 480 ๏ด 100 = 24.9% 480 (c) VS = 257.3๏0.258๏ฐ + 177.24๏112.5๏ฐ = 251.2๏41.03๏ฐ kVLN VS = 251.2 3 = 435.1kVLL VR NL = VS / A = 435.1/ 0.9285 = 468.6 kVLL % VR = 5.18 468.6 − 480 ๏ด 100 = −2.4% 4.80 ๏ง l = l y z = 230 ( 0.843 ๏ด 5.105 ๏ด 10 ) ๏ ( 79.04๏ฐ + 90๏ฐ) 2 −6 = 0.4772๏84.52๏ฐ = 0.0456 + j 0.475 = (๏ก + j ๏ข ) l ZC = VR = z 0.8431 = ๏ ( 79.04๏ฐ − 90๏ฐ ) 2 = 406.4๏ − 5.48๏ฐ ๏ y 5.105 ๏ด 10 −6 215 3 = 124.13๏0๏ฐ kV/ph.; I R = 125 ๏ด 103 3 ๏ด 215 ๏0๏ฐ = 335.7๏0๏ฐ A 1 1 cosh ๏ง l = e0.0456 ๏27.22๏ฐ + e −0.0456 ๏ − 27.22๏ฐ = 0.8904๏1.34๏ฐ 2 2 1 1 sinh ๏ง l = e0.0456 ๏27.22๏ฐ − e −0.0456 ๏ − 27.22๏ฐ = 0.4597๏84.93๏ฐ 2 2 95 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. VS = VR cosh ๏ง l + I R Z C sinh ๏ง l = (124.13 ๏ด 0.8904๏1.34๏ฐ ) + ( 0.3357 ๏ด 406.4๏ − 5.48๏ฐ ๏ด 0.4597๏84.93๏ฐ ) = 137.86๏27.77๏ฐ kV Line-to-Line voltage magnitude at the sending end is I S = I R cosh ๏ง l + 3 137.86 = 238.8kV VR sinh ๏ง l = ( 335.7 ๏ด 0.8904๏1.34๏ฐ ) + ZC 124,130 ๏ด 0.4597๏84.93๏ฐ 406.4๏ − 5.48๏ฐ = 332.31๏26.33๏ฐ A Sending-end line current magnitude is 332.31 A PS (3๏ฆ ) = 3 ( 238.8 )( 332.31) cos ( 27.77๏ฐ − 26.33๏ฐ ) = 137, 433 kW QR ( 3๏ฆ ) = 3 ( 238.8 )( 332.31) sin ( 27.77๏ฐ − 26.33๏ฐ ) = 3454 kVAR Voltage Regulation = (137.86 / 0.8904 ) − 124.13 = 0.247 124.13 ( Note that at no load, I = 0; V = V / cosh ๏ง l ) R R S since ๏ข = 0.475/ 230 = 0.002065 rad/mi The wavelength ๏ฌ = 2๏ฐ ๏ข = 2๏ฐ = 3043 mi 0.002065 and the velocity of propagation = f ๏ฌ = 60 ๏ด 3043 = 182,580 mi/s 5.19 Choosing a base of 125 MVA and 215 kV, ( 215) = 370 ๏; Base Current = 125 ๏ด103 = 335.7 A 2 Base Impedance = 125 3 ๏ด 215 406.4๏ − 5.48๏ฐ = 1.098๏ − 5.48 pu; VR = 1๏0๏ฐ pu 370 So Z C = The load being at unity pf, I R = 1.0๏0๏ฐ pu ๏ VS = VR cosh ๏ง l + I R Z C sinh ๏ง l = (1๏0๏ฐ ๏ด 0.8904๏1.34๏ฐ ) + (1๏0๏ฐ ๏ด 1.098๏ − 5.48๏ฐ ๏ด 0.4597๏84.93๏ฐ ) = 1.1102 ๏27.75๏ฐ pu I S = I R cosh ๏ง l + VR sinh ๏ง l ZC 1.0๏0๏ฐ ๏ฆ ๏ถ = (1๏0๏ฐ ๏ด 0.8904๏1.34๏ฐ ) + ๏ง ๏ด 0.4597๏84.93๏ฐ ๏ท 1.098 ๏ − 5.48 ๏ฐ ๏จ ๏ธ = 0.99 ๏26.35๏ฐ pu 96 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. At the sending end Line to line voltage magnitude = 1.1102 ๏ด 215 = 238.7 kV Line Current Magnitude = 0.99 ๏ด 335.7 = 332.3A 5.20 (a) Let ๏ฑ = ๏ง l = Then A = 1 + ZY ZY Z 2Y 2 Z 3Y 3 + + + 2 24 720 which iscosh ๏ง l ๏ฆ ๏ถ ( ZY )3/ 2 ( ZY )5/ 2 ( ZY )7/ 2 B = Z C ๏ง ( ZY )1/ 2 + + + + ๏ท which is Z C sinh ๏ง l 6 120 5040 ๏จ ๏ธ 3/ 2 5/ 2 ๏ถ 1 1 ๏ฆ ( ZY ) ( ZY ) ( ZY )7/ 2 1/ 2 C= sinh ๏ง l = ( ZY ) + + + + ๏ท ๏ง ZC Zc ๏จ 6 120 5040 ๏ธ D=A Considering only the first two terms, ๏ผ ๏ฏ ๏ฏ 3/ 2 ๏ฏ ๏ฆ ( ZY ) ๏ถ ๏ฏ B = Z C ๏ง ( ZY ) 2 + ๏ท๏ฝ ๏ฌ 6 ๏ธ๏ฏ ๏จ 1 ๏ฆ ( ZY )3/ 2 ๏ถ ๏ฏ 2 C= ( ZY ) + ๏ง ๏ท๏ฏ Zc ๏จ 6 ๏ธ ๏ฏ๏พ A = D =1+ ZY 2 (b) Refer to Table 5.1 of the text. For Nominal-๏ฐ circuit: A −1 Y = ;B= Z ๏ฌ B 2 For Equivalent-๏ฐ circuit: 5.21 A −1 Y๏ข = ; B = Z๏ข ๏ฌ B 2 Vs = AVR + BI R Eq. (5.1.1): VS I S = AVR I S + BI R I S Substituting I S = CVR + DI R and A = D VS I S = A VR I S + BI R (CVR + AI R ) Now adding VR I R on both sides, VS I S + VR I R = AVR I S + ( BC + 1)VR I R + BAI R2 But A2 − BC = 1 Hence VS I S + VR I R = AVR I S + A 2VR I R + BAI R2 = A (VR I S + VS I R ) 97 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏A = Now B = VS I S + VR I R ๏ฌ VR I S + VS I R VS − AVR ; substituting the above result IR For A , one obtains B = Thus B = or B = 5.22 VS VR ๏ฆ VS I S + VR I R ๏ถ − ๏ง ๏ท I R I R ๏จ VR I S + VS I R ๏ธ VSVR I S + VS2 I R − VRVS I S − VR2 I R I R (VR I S + VS I R ) VS2 − VR2 ๏ฌ VR I S + VS I R 1 +X e๏ฑ + e−๏ฑ ; with X = e−๏ฑ , A = X A= 2 2 or X 2 − 2 AX + 1 = 0 ; Substituting X = X1 + jX 2 And A = A1 + jA2 , one gets X12 − X22 + 2 jX1 X2 − 2 ๏ฉ๏ซ A1 X1 − A2 X2 + j ( A2 X1 + A1 X2 )๏น๏ป + 1 = 0 which implies X12 − X 22 − 2 ๏ A1 X1 − A2 X 2 ๏ + 1 = 0 ๏ผ ๏ฏ ๏ฝ ๏ฌ and X1 X 2 − ( A2 X1 + A1 X 2 ) = 0 ๏ฏ ๏พ 5.23 Equivalent ๏ฐ circuit: Z ๏ข = B = 164.6๏85.43๏ฐ = (13.1 + j164.1) ๏ = R๏ข + jx๏ข Alternatively: Z ๏ข = Z F1 = ( zl ) sinh ๏ง l ๏งl ๏ฉ 0.5824๏87.88๏ฐ ๏น = ( 0.35128 ๏85.1๏ฐ ) 500 ๏ช ๏บ ๏ซ 0.622 ๏87.55๏ฐ ๏ป = 164.5๏85.43๏ฐ ๏ ๏ฉ ๏น Y๏ข Y yl yl ๏ช cosh ๏ง l − 1 ๏บ = F2 = ๏ฉ๏ซ tanh ( ๏ง l /2 ) ( ๏ง l /2 ) ๏น๏ป = ๏ช ๏บ 2 2 2 2 ๏ช ๏ง l ๏ sinh ๏ง l ๏บ ๏ซ 2 ๏ป ๏ฉ ๏น 0.8136 + j 0.01548 − 1 ๏ฆ 4.4 ๏ด 10−6 ๏ถ =๏ง ๏90๏ฐ ๏ท ( 400 ) ๏ช ๏บ 2 ๏จ ๏ธ ๏ช๏ซ ( 0.311๏87.55๏ฐ )( 0.5824 ๏87.75๏ฐ ) ๏บ๏ป G ๏ข + jB๏ข = 1.136 ๏ด 10−3 ๏89.8๏ฐ S = (3.96 ๏ด 10 −6 + j1.136 ๏ด 10 −3 )S = 2 98 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. R๏ข = 13.1 ๏ is 13% smaller than R = 15 ๏ X ๏ข = 164.1๏ is 6% smaller than X = 175 ๏ B๏ข / 2 = 1.136 ๏ด10−3 S is 3% larger than Y / 2 = 1.1๏ด10−3 S G๏ข / 2 = 3.96 ๏ด10−6 S is introduced into the equivalent ๏ฐ circuit. 5.24 Z ๏ข = B = 98.25๏86.69๏ฐ๏ = 5.673 + j 98.09 ๏ ๏ฉ ๏น ๏ช ๏บ Y๏ข ๏ฆ Y ๏ถ cosh ๏ง l − 1 ๏ฆ 4.807 ๏ถ = ๏ง ๏ท F2 = ๏ง ๏ด 10 −6 ๏90๏ฐ ๏ด 300 ๏ท ๏ช ๏บ ๏ง l 2 ๏จ2๏ธ ๏จ 2 ๏ธ ๏ช sinh ๏ง l ๏บ ๏ซ๏ช 2 ๏ป๏บ ๏ฉ ๏น ๏ช ๏บ 1.442 0.9285 + j 0.00418 − 1 ๏ฆ ๏ถ =๏ง ๏ด 10 −3 ๏90๏ฐ ๏ท ๏ช ๏บ ๏จ 2 ๏ธ ๏ช 0.3812 ๏88.3๏ฐ ( 0.3716๏88.39๏ฐ ) ๏บ ๏ช๏ซ 2 ๏บ๏ป ๏ฉ −0.0715 + j 0.00418 ๏น = 7.21 ๏ด 10 −4 ๏90๏ฐ ๏ช ๏บ ๏ซ 0.0708๏176.7๏ฐ ๏ป = 6.37 ๏ด 10 −7 + j 7.294 ๏ด 10 −4 S 99 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. R๏ข = 5.673 ๏ is 5.5% smaller than R = 6 ๏ X ๏ข = 98.09 ๏ is 2.4% smaller than X = 100.5 ๏ B๏ข / 2 = 7.294 ๏ด 10−4 S is 1.2% larger than Y / 2 = 7.211๏ด 10−4 S G๏ข / 2 = 6.37 ๏ด 10−7 S is introduced into the equivalent ๏ฐ circuit 5.25 The long line ๏ฐ-equivalent circuit is shown below: z = ( 0.1826 + j 0.784 ) ๏ / mi per phase y= 1 1 = = 5.391 ๏ด 10 −6 ๏90๏ฐ S /mi per phase xc ๏ − 90๏ฐ 185.5 ๏ด 103 ๏ − 90๏ฐ ๏ง = y z ; Z = zl = 160.99๏76.89๏ฐ ๏; Y = yl = 1.078 ๏ด 10 −3 ๏90๏ฐ S F1 = ( sinh ๏ง l ) / ๏ง l = 0.972๏0.37๏ฐ; F2 = ๏ Z๏ข = Z tanh ( ๏ง l / 2 ) ๏ง l /2 = 1.0144๏ − 0.19๏ฐ sinh ๏ง l = 156.48๏77.26๏ฐ ๏ ๏งl Y ๏ข Y ๏ฆ tanh ( ๏ง l / 2 ) ๏ถ = ๏ง ๏ท = 0.5476 ๏ด 10 −3 ๏89.81๏ฐ S 2 2 ๏ง๏จ ๏ง l / 2 ๏ท๏ธ I Z ๏ข = I R + VR Y๏ข = 502๏0๏ฐ + (132,800 ๏0๏ฐ ) ( 0.5476 ๏ด 10−3 ๏89.81๏ฐ ) 2 = 507.5 ๏8.24๏ฐ A VS = VR + I Z ๏ข Z ๏ข = 132,800๏0๏ฐ + 507.5๏8.24๏ฐ (156.48๏77.26๏ฐ ) = 160,835 ๏29.45๏ฐ V (a) Sending end line to line voltage magnitude = 3160.835 = 278.6 kV ๏ฆY๏ข ๏ถ (b) I S = I Z ๏ข + VS ๏ง ๏ท = 507.5๏8.24๏ฐ + 160.835 ( 0.5476 ) ๏29.45 + 89.81๏ฐ ๏จ2๏ธ = 482.93 ๏18.04๏ฐ A; I S = 482.93A (c) SS (3๏ฆ ) = 3VS I S๏ช = 3 (160.835)( 0.48293) ๏29.45๏ฐ − 18.04๏ฐ = 228.41 MW+ j 46.1 M var (d) Percent voltage regulation = 160.835 − 132.8 ๏ด 100 = 21.1% 132.8 100 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 5.26 (a) z = y ZC = j 0.34 = 274.9 ๏0๏ฐ = 274.9 ๏ j 4.5 ๏ด 10−6 (b) ๏ง l = z y ( l ) = ( j 0.34) ( j 4.5 ๏ด10−6 ) ( 350 ) = j 0.4330pu (c) ๏ง l = j ( ๏ข l ) ; ๏ข l = 0.4330 pu A = D = cos ( ๏ข l ) = cos ( 0.4330 radians ) = 0.9077๏0๏ฐ pu B = j Z C sin ( ๏ข l ) = j ( 274.9 ) sin ( 0.4330 radians ) = j115.35 ๏ ๏ฆ 1 ๏ถ ๏ฆ 1 ๏ถ C = j๏ง ๏ท sin ( ๏ข l ) = j ๏ง ๏ท sin ( 0.4330 radians ) ๏จ 274.9 ๏ธ ๏จ ZC ๏ธ = j1.516 ๏ด 10−3 S (d) ๏ข = 0.4330 / 350 = 1.237 ๏ด10−3 radians/ km ๏ฌ = 2๏ฐ /๏ข = 5079 km (e) SIL = 2 Vrated L−L ZC ( 500 ) = 909.4 MW 3๏ฆ = ( ) 2 274.9 0.4×10−6 ๐ฟ 5.27 ๐๐ = √๐ถ = √28.3×10−12 = 118.9 Ω 5.28 1 1 √ 60⋅√0.4×10−6 ⋅28.3×10−12 ๐ = ๐ ๐ฟ๐ถ = = 4.95 × 106 m; ๐ฃ๐๐๐๐ = ๐๐ = (4.95 × 106 m)(60 ๐ป๐ง) = 2.97 × 108 m/s. Yes, it is reasonable because it is slightly lower than the speed of light. 5.29 ๐๐ and ๐ฃ๐๐๐๐ have not been affected as they are not frequency dependent. The new value for ๐ฃ ๐ = ๐๐๐๐ = ๐ 5.30 ZC = 2.97×108 = 7.42 × 105 m 400 L1 z = = y C1 ๏ญ0 2๏ฐ Ln ( Deq / DSL ) ๏ฆD ๏ถ 2๏ฐ๏ฅ 0 / Ln ๏ง eq ๏ท ๏จ DSC ๏ธ ๏ฉ ๏ฆ D ๏ถ ๏ฆ D ๏ถ๏น ๏ช Ln ๏ง eq ๏ท Ln ๏ง eq ๏ท ๏บ ๏ญ0 ๏ช ๏จ DSL ๏ธ ๏จ DSC ๏ธ ๏บ ZC = ๏ช ๏บ ๏ฅo ๏ช 2๏ฐ ๏บ Geometric factors Characteristic ๏ช ๏บ impedence of ๏ซ ๏ป free space where ๏ญ0 4๏ฐ ๏ด 10 −7 = = 377 ๏ ๏ฅ0 ๏ฆ 1 ๏ถ −9 ๏ง 36๏ฐ ๏ท ๏ด 10 ๏จ ๏ธ 101 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 1 = L1C1 ๏ท= 1 ๏ฆ Deq ๏ถ ๏ญ0 ๏ฆ Deq ๏ถ Ln ๏ง ๏ท 2๏ฐ๏ฅ 0 / Ln ๏ง ๏ท 2๏ฐ ๏จ DSL ๏ธ ๏จ DSC ๏ธ ๏ฆ ๏ถ ๏ง ๏ฆ 1 ๏ถ Ln ( Deq / DSC ) ๏ท ๏ท ๏ท =๏ง ๏ท๏ง ๏ง ๏ญ ๏ฅ ๏ท ๏ง Ln ( D / D ) ๏ท eq SL ๏จ 0 0 ๏ธ๏ง ๏ง ๏ท๏ท Free space ๏จ Geometric factors ๏ธ velocity of propagation where 1 ๏ญ0๏ฅ 0 = ( 1 m = 3.0 ๏ด 108 s ๏ฆ 1 ๏ถ 4๏ฐ ๏ด 10 −7 ๏ง ๏ด 10 −9 ๏ท ๏จ 36๏ฐ ๏ธ ) For the 765 kV line in Example 5.10, Deq = 3 (14)(14)(28) = 17.64 m 3 ๏ฆ .0403 ๏ถ DSL = 1.091 4 ๏ง ( 0.457 ) = 0.202 m ๏ท ๏จ 3.28 ๏ธ 3 ๏ฆ 1.196 ๏ถ DSC = 1.091 4 ๏ง (.0254 )( 0.457 ) = 0.213m ๏ท ๏จ 2 ๏ธ ๏ฉ ๏ฆ 17.64 ๏ถ ๏ฆ 17.64 ๏ถ ๏น ๏ช Ln ๏ง ๏ท Ln ๏ง ๏ท๏บ ๏จ 0.202 ๏ธ ๏จ 0.213 ๏ธ ๏บ ๏ช Z C = 377 = 267 ๏ ๏ช ๏บ 2๏ฐ ๏ช ๏บ ๏ซ๏ช ๏ป๏บ ๏ท = 3 ๏ด 108 Ln (17.64 /.213 ) Ln (17.64 /.202 ) = 2.98 ๏ด 108 m s 5.31 (a) For a lossless line, ๏ข = ๏ท LC = 2๏ฐ ( 60 ) 0.97 ๏ด 0.0115 ๏ด 10 −9 = 0.001259 rad/km ZC = L / C = 0.97 ๏ด 10 −3 = 290.43 ๏ 0.0115 ๏ด 10 −6 Velocity of propagation ๏ต = 1 LC = and the line wave length is ๏ฌ = ๏ต / f = (b) VR = 500 3 1 0.97 ๏ด 0.0115 ๏ด 10 −9 ( = 2.994 ๏ด 105 km/s ) 1 2.994 ๏ด 103 = 4990 km 60 ๏0๏ฐ kV = 288.675๏0๏ฐ kV 102 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 800 ๏ cos−1 0.8 = 800 + j 600 MVA = 1000๏36.87๏ฐ MVA 0.8 (1000๏ − 36.87๏ฐ )103 = 1154.7๏ − 36.87๏ฐ A I R = S * R(3๏ฆ ) / 3VR* = 3 ๏ด 288.675๏0๏ฐ SR(3๏ฆ ) = Sending end voltage VS = cos ๏ข lVR + jZ c sin ๏ข lI R ๏ข l = 0.001259 ๏ด 300 = 0.3777rad = 21.641๏ฐ ๏VS = 0.9295 ( 288.675๏0๏ฐ ) + j ( 290.43) 0.3688 (1154.7๏ − 36.87๏ฐ ) (10−3 ) = 356.53๏16.1๏ฐ kV Sending end line-to-line voltage magnitude = 3 356.53 = 617.53 kV IS = j 1 sin ๏ข lVR + cos ๏ข l I R ZC 1 0.3688 ( 288.675๏0๏ฐ )103 + 0.9295 (1154.7๏ − 36.87๏ฐ ) 290.43 = 902.3๏ − 17.9๏ฐ A; Line current = 902.3A =j SS ( 3๏ฆ ) = 3VS I S๏ช = 3 ( 356.53๏16.1๏ฐ )( 902.3๏ − 17.9๏ฐ )10 −3 = 800 MW + j 539.672 MVAR Percent voltage regulation = ( 356.53 / 0.9295 ) − 288.675 ๏ด 100 288.675 = 32.87% 5.32 (a) The line phase constant is ๏ข l = 2๏ฐ ๏ฌ 360 lrad = ๏ฌ l= 360 315 3000 = 22.68๏ฐ From the practical line loadability, P3๏ฆ = VS puVR pu ( SIL ) sin ๏ข l sin ๏ค ; 700 = (1.0 )( 0.9 )( SIL ) sin 36.87๏ฐ sin 22.68๏ฐ ๏ SIL = 499.83MW ( kV Since SIL = ) MW, kV = Z SIL = 2 L rated Zc L c ( ) ( 320 )( 499.83) = 400 kV (b) The equivalent line reactance for a lossless line is X ๏ข = Z c sin ๏ข l = 320 ( sin 22.68๏ฐ ) = 123.39 ๏ For a lossless line, the maximum power that can be transmitted under steady-state condition occurs for a load angle of 90๏ฐ. 103 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. With VS = 1pu = 400 kV ( L − L ) , VR = 0.9 pu = 0.9 ( 400 ) kV ( L − L ) Theoretical Maximum Power = ( 400 )( 0.9 ๏ด 400 ) ๏ด 1 123.39 = 1167 MW 5.33 (a) V2 = Z C I 2 since the line is terminated in Z C . Then V1 = V2 ( cosh ๏ง l + sinh ๏ง l ) = V2 e๏ง l = V2 e๏ก l e j ๏ข l (1) I1 = I 2 ( cosh ๏ง l + sinh ๏ง l ) = I 2 e๏ง l = I 2 e๏ก l e j ๏ข l (2) V V ๏ 1 = 2 = ZC ๏ฌ I1 I 2 (b) V1 = V1 = V2 e๏ก l or (c) ( Note :๏ง = ๏ก + j ๏ข ) V2 = e −๏ก l V1 From (1) ๏ฌ I2 = e −๏ก l I1 From (2) ๏ฌ (d) −S21 = V2 I 2๏ช = V1e −๏ก l e − j ๏ข l I1๏ชe−๏ก l e j ๏ข l = S12 e −2๏ก l S Thus − 21 = e −2๏ก l ๏ฌ S12 which is ( I 22 / I12 ) . (e) Noting that ๏ก is real, ๏จ= − P21 = e−2๏ก l ๏ฌ P12 104 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 5.34 For a lossless line, ZC = L , Eq. (5.4.3) of text which is pure real, i.e. resistive. C ๏ง = j ๏ข is pure imaginary; ๏ข = ๏ท LC ; ๏ก = 0 ๏ V2 I 2 −S21 − P21 = = = =๏จ = 1 V1 I1 S12 P12 P12 = Re (V1I1๏ช ) = Re ZC I12 = ZC I12 Since ZC is real. Since I1 = V1 / Z C , P12 = V12 / Z C ๏ฌ 5.35 Open circuited ๏ I 2 = 0; Lossless ๏ ๏ก = 0; ๏ง = j ๏ข . Short line: V1 = V2 ๏ฆ ( ๏ง l )2 ๏ถ ๏ผ ๏ฆ ZY ๏ถ ๏ทV2 ๏ฏ Medium Line: Nominal ๏ฐ : V1 = ๏ง1 + ๏ทV2 = ๏ง๏ง1 + ๏ท ๏ฏ 2 ๏ธ 2 ๏จ ๏จ ๏ธ ๏ฏ 2 ๏ฉ (๏ขl) ๏น ๏ฏ๏ฏ = ๏ช1 − ๏บ V2 ๏ฝ ๏ฌ 2 ๏บ๏ป ๏ช๏ซ ๏ฏ ๏ฏ Long Line: Equiv. ๏ฐ : V1 = V2 cosh ๏ง l = V2 cos ๏ข l ๏ฏ ๏ฏ ๏ฏ๏พ Note: The first two terms in the series expansion of cos ๏ข l are 1 − (๏ขl) 2 2 While V1 = V2 in the case of short-line model, ๏ผ ๏ฏ the voltage at the open receiving end is higher ๏ฏ ๏ฝ ๏ฌ than that at the sending end,for small ๏ข l,for ๏ฏ ๏ฏ๏พ the medium and long-line models. 5.36 From Problem 5.7 solution, see Eq. (1) VS2 = VR2 + 2VR I ( R cos๏ฆR + X sin ๏ฆR ) + I 2 ( R2 + X 2 ) Using P = VR I cos๏ฆR and Q = VR I sin ๏ฆR , one gets −VS2 + VR2 + 2 PR + 2QX + 1 ( P 2 + Q2 )( R 2 + X 2 ) = 0 VR2 (2) In which only P and Q vary. 105 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. For maximum power, dP / dQ = 0 : dP 2 X + 2QC R2 + X 2 =− , Where C = dQ 2 R + 2 PC VR2 and for V2X dP = 0, Q = − 2 R 2 ๏ฌ dQ R +X Substituting the above in (2), after some algebraic simplification, one gets PMAX = ๏ถ VR2 ๏ฆ ZVS − R ๏ง ๏ท ๏ฌ Z 2 ๏จ VR ๏ธ where Z = R 2 + X 2 . * ๏ฆV −V ๏ถ V 2 V V * 5.37 (a) S12 = V I = V1 ๏ง 1 2 ๏ท = 1 * − 1 *2 Z Z ๏จ Z ๏ธ * 1 1 = V12 j ๏Z V1V2 j ๏Z j๏ฑ12 e − e e ๏ฌ (1) Z Z which is the power sent by V1 . S21 = V22 j๏Z V2V1 j๏z − j๏ฑ12 e − e e Z Z and − S21 = − V22 j๏z V2V1 j๏z − j๏ฑ12 e + e e ๏ฌ2 Z Z which is the power received by V2 . (b) (i) With V1 = V2 = 1.0 ๏ผ ๏ฏ ๏ฝ ๏ฌ −S21 = −1๏85๏ฐ + 1๏75๏ฐ = 0.1717 − j 0.0303๏ฏ ๏พ S12 = 1๏85๏ฐ − 1๏95๏ฐ = 0.1743 (ii) With V1 = 1.1 and V2 = 0.9 ๏ผ S12 = 1.21๏85๏ฐ − 0.99๏95๏ฐ = 0.1917 + j 0.2192 ๏ฏ ๏ฝ ๏ฌ −S21 = −0.81๏85๏ฐ + 0.99๏75๏ฐ = 0.1856 + j 0.1493๏ฏ ๏พ ๏ผ ๏ฝ ๏ฌ but Q12 and − Q21 have changed considerably. ๏พ Comparing, P12 has not changed much, 5.38 From Problem 5.14 A = 0.8137๏1.09๏ฐ pu; A = 0.8137 and ๏ฑ A = 1.09๏ฐ B = Z ๏ข = 164.6๏85.3๏ฐ ๏; Z ๏ข = 164.6 and ๏ฑ Z = 85.3๏ฐ Using Eq. (5.5.6) 106 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 500 ๏ด 500 ( 0.8137 )( 500 ) PR max = − cos ( 85.3๏ฐ − 1.09๏ฐ ) 164.4 164.4 = 1519 − 122 = 1397 MW ( 3๏ฆ ) 2 For this loading at unity power factor, IR = PR max 3 VR LL ( PF ) = 1397 3 ( 500 )(1.0 ) = 1.61kA / Phase From Table A.4, the thermal limit for 3 ACSR 1113 kcmil conductors is 3 ๏ด1.11 = 3.33 kA/ p hase. The current 1.61 kA corresponding to the theoretical steady-state stability limit is well below the thermal limit of 3.33 kA. 5.39 Line Length 200 km 600 km ZC ๏ 282.6๏ − 2.45๏ฐ 282.6 ๏ − 2.45๏ฐ ๏งl pu 0.2486๏87.55๏ฐ 0.7459๏87.55๏ฐ A=D pu 0.9694๏0.1544๏ฐ 0.7356๏1.685๏ฐ B ๏ 69.54๏85.15๏ฐ 191.8๏85.57๏ฐ C S 8.71๏ด10−4 ๏90.05๏ฐ 2.403 ๏ด10−3 ๏90.47๏ฐ PR max MW 3291 1201 The thermal limit of 3.33 kA/phase corresponds to 3 ( 500) 3.33 = 2884 MW at 500 kV and unity power factor. (100 kV)(100 kV) ๐ ๐ ๐ ๐ 5.40 ๐๐๐๐๐ฅ = ๐๐ฟ sin ๐ = (2๐60)(12mH) sin 30° = 1105 MW 5.41 (a) Z = zl = ( 0.088 + j 0.465 )100 = 8.8 + j 46.5 ๏ Y yl = = ( j 3.524 ๏ด 10−6 )100 / 2 = j 0.1762mS 2 2 ( 230 ) = 529 ๏ = 2 Z base = V 2 L base S3๏ฆ base 100 ๏ Z = ( 8.8 + j 46.5 ) / 529 = 0.0166 + j 0.088 pu Y = j 0.1762 (1/ 0.529 ) = j 0.09321pu 2 107 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. The nominal ๏ฐ circuit for the medium line is shown below: <<Figure 12>> (b) S3๏ฆ rated = VL rated I L rated 3 = 230 ( 0.9 ) 3 = 358.5 MVA (c) A = D = 1 + ZY = 1 + (8.8 + j 46.5 ) ( j 0.1762 ๏ด10−3 ) = 0.9918๏0.1๏ฐ 2 B = Z = 8.8 + j 46.5 = 47.32๏79.3๏ฐ ๏ C =Y + Z Y2 = 0.3510๏90.04๏ฐ mS 4 (d) SIL = VL2rated ZC ZC = z 0.088 + j 0.465 = ๏ด 103 = 366.6๏ − 5.36๏ฐ ๏ y j 3.524 ๏ SIL = ( 230 ) 366.6 = 144.3M W 2 ๏ฐ 5.42 2๏ฐ 360 ๏ฆ 360 ๏ถ ๏ข l = l radians = ๏ง l๏ท = ( 500 ) = 36๏ฐ ๏ฌ ๏จ ๏ฌ ๏ธ 5000 Using Eq. (5.4.29) of the text, 460 = 1.0 ๏ด 0.9 ( SIL ) sin36.87๏ฐ sin36๏ฐ 1 ๏ด 0.9 ๏ด SIL = ( 0.6 ) 0.5878 From which SIL = 500.7 MW From Eq. (5.4.21) of the text, VL − L = ( ZC ) SIL = ( 500.7 ) 500 = 500.3kV Nominal voltage level for the transmission line is 500 kV ๏ฌ For ๏ loss less line, X ๏ข = ZC sin ๏ข l = 500sin36๏ฐ = 293.9 ๏ From Eq. (5.4.27) of the text, P3๏ฆ max = ( 500 )( 0.9 ๏ด 500 ) = 765.6 MW ๏ฌ 293.9 108 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 5.43 The maximum amount of real power that can be transferred to the load at unity pf with a bus voltage greater than 0.9 pu (688.5 kV) is 2950 MW. 5.44 The maximum about of reactive power transfer that can be transferred to the load with a bus voltage greater than 0.9 pu is 650 Mvar. 5.45 (a) Using Eq. (5.5.3) with ๏ค = 35๏ฐ ( 500 )( 0.95 ๏ด 500 ) cos 85.3๏ฐ − 35๏ฐ − ( 0.8137 )( 0.95 ๏ด 500 ) cos 85.3๏ฐ − 1.09๏ฐ ( ) ( ) 2 PR = 164.6 = 919 − 110 = 810 MW (3๏ฆ ) 164.6 PR = 810 MW is the practical line loadability provided that the voltage drop limit and thermal limits are not exceeded. (b) I R FL = PR 3 VR LL ( PF ) = 810 3 ( 0.95 ๏ด 500 )( 0.99 ) = 0.99 kA (c) VS = AVR FL + B I R FL 109 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏๏ค = ( 0.8137๏1.09๏ฐ ) (VR FL ๏0๏ฐ ) + (164.6๏85.3๏ฐ )( 0.99๏8.109๏ฐ ) 3 288.68๏๏ค = 0.8137VR FL ๏1.09๏ฐ + 162.9๏93.41๏ฐ 500 288.68๏๏ค = ( 0.8136VR FL − 10.06 ) + j ( 0.0154VR FL + 162.6 ) Taking the squared magnitude of the above equation: 83333 = 0.6622VR2 FL − 11.36VR FL + 26540 Solving the above quadratic equation: VR FL = 11.36 + (11.36) + 4 ( 0.6622)( 56793) = 301.6kVL − N 2 ( 0.6622 ) 2 VR FL = 301.6 3 = 522kVL −L = 1.04pu (d) VR NL = VS /A = 500 0.8137 = 614.5kVL − L % VR = 614.5 − 522 ๏ด 100 = 18% 522 (e) From Problem 5.38, thermal limit is 3.33 kA. Since VR FL / VS = 522 / 500 = 1.04 ๏พ 0.95, and the thermal limit of 3.33 kA is greater than 0.99kA, the voltage drop and thermal limits are not exceeded at PR = 810MW. Therefore, loadability is determined by stability. 5.46 A = 0.9739๏0.0912๏ฐ pu; A = 0.9739, ๏ฑ A = 0.0912๏ฐ B = Z = 60.48๏86.6๏ฐ ๏; Z = 60.48, ๏ฑ Z = 86.6๏ฐ (a) Using Eq. (5.5.3) with ๏ค = 35๏ฐ : 500 ( 0.95 ๏ด 500 ) cos ( 86.6๏ฐ − 35๏ฐ ) − 60.48 = 2439.2 − 221.2 = 2218 MW ( 3๏ฆ ) PR = 0.9739 ( 0.95 ๏ด 500 ) 60.48 2 cos ( 86.6๏ฐ − 0.0912๏ฐ ) PR = 2218MW is the line loadability if the voltage drop and thermal limits are not exceeded. (b) I R FL = PR 3VR LL ( pf ) = 2218 3 ( 0.95 ๏ด 500 )( 0.99 ) = 2.723kA (c) VS = AVR + BI R 500 3 ๏๏ค = ( 0.9739๏0.0912๏ฐ ) VR FL ๏0๏ฐ + 60.48๏86.6๏ฐ ( 2.723๏8.11๏ฐ ) 288.68๏๏ค = ( 0.9739 VR FL − 13.55) + j ( 0.0016VR FL + 164.14 ) Taking the squared magnitude of the above 83,333 = 0.93664VR2FL − 25.6VR FL + 27,126 110 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Solving the above quadratic equation: VR FL = 25.60 + ( 25.60 ) + 4 (.93664 )( 56,207 ) = 250.68 kVLN 2 ( 0.9678 ) 2 VR FL = 250.68 3 = 434.18 kVLL = 0.868 per unit for this load current, 2.723 kA, the voltage drop limit VR / VS = 0.95 is exceeded. The thermal limit, 3.33 kA is not exceeded. Therefore the voltage drop limit determines loadability for this line. Based on VR FL = .95 per unit , IRFL is calculated as follows: VS = AVR FL + B I R FL ๏ฆ 0.95 ๏ด 500 ๏ถ ๏๏ค = ( 0.9739๏0.0912๏ฐ ) ๏ง ๏0๏ฐ ๏ท + 60.48๏86.6๏ฐ ( I R FL ๏8.11๏ฐ ) 3 3 ๏จ ๏ธ 288.68๏๏ค = 267.09๏0.0912๏ฐ + 60.48 I R FL ๏94.71๏ฐ 500 = ( −4.966 I R FL + 267.09 ) + j ( 60.28 I R FL + 0.4251) Taking squared magnitudes; 83,333 = 3658 I R2 FL − 2601 I R FL + 71,337 Solving the quadratic: I R FL = 2601 + ( 2601) + 4 (3658 )(11,996 ) = 2.2 kA 2 ( 3658 ) 2 At 0.99 pf leading, the practical line loadability for the line is PR = 3 ( 0.95 ๏ด 500 ) 2.2 ( 0.99 ) = 1792MW which is based on the voltage drop limit VR / VS = 0.95. (d) VR NL = VS / A = 500 / 0.9739 = 513.4 kVLL % VR = 513.4 ( 500 ๏ด 0.95) 500 ๏ด 0.95 ๏ด 100 = 8.08% 111 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 5.47 (a) l = 200kM; The steady-state limit is: PR = − 500 ( 0.95 ๏ด 500 ) 69.54 cos ( 86.15๏ฐ − 35๏ฐ ) 0.9694 ( 0.95 ๏ด 500 ) 69.54 = 1914 MW I R FL = PR 3 VR FL ( PF ) = 2 cos ( 85.14๏ฐ − 0.154๏ฐ ) 1914 3 ( 0.95 ๏ด 500 )( 0.99 ) = 2.35 kA VS = AVR FL + B I R FL 500 3 ๏๏ค = ( 0.9694๏0.154๏ฐ ) (VR FL ๏0๏ฐ ) + ( 69.54๏85.15๏ฐ )( 2.35๏8.109๏ฐ ) 288.675๏๏ค = ( 0.9694VR FL − 9.29 ) + j ( 0.0026VR FL + 163.1) Taking the squared magnitude: 83333. = 0.9397 VR2FL − 17.16VR FL + 26707 Solving VR FL = 17.16 + (17.16) + 4 ( 0.9397 )( 56626) = 254.8kVL − N 2 ( 0.9397 ) 2 VR FL = 254.8 3 = 441.3kVL − L = 0.8825 pu The voltage drop limit VR FL VS ๏ณ 0.95 is not satisfied. At the voltage drop limit: VS = AVR FL + B I R FL ๏ฆ 0.95 ๏ด 500 ๏ถ ๏๏ค = ( 0.9694 ๏0.154๏ฐ ) ๏ง ๏0๏ฐ ๏ท + 3 3 ๏จ ๏ธ 500 ( 69.54๏85.15๏ฐ ) ( I R FL ๏8.109๏ฐ ) 288.675๏๏ค = ( 265.85 − 3.953I R FL ) + j ( 0.715 + 69.4 I R FL ) 83333 = 70677 − 2003 I R FL + 4836I R2 FL I R FL = 2003 + ( 2003) + 4 ( 4836)(12656) = 1.84kA 2 ( 4836 ) 2 The practical line loadability for this 200-km line is PR FL = 3 ( 0.95 ๏ด 500 )1.84 ( 0.99 ) = 1499 MW = 1499/885 = 1.69 pu at VR FL VS = 0.95pu and at 0.99pf leading. Note: SIL = (500)2/282.6 = 885 MW 112 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (b) l = 600 kM PR = 500 ( 0.95 ๏ด 500 ) 191.8 cos ( 85.57๏ฐ − 35๏ฐ ) − 0.7356 ( 0.95 ๏ด 500 ) 191.8 2 cos ( 85.57๏ฐ − 1.685๏ฐ ) = 786.5 − 92.3 = 694.2 MW = 694.2/885 = 0.78 pu The practical line loadability is 694.2 MW corresponding to steady-state stability for the 600km line. 5.48 (a) SIL = ( 345) 300 = 396.8MW 2 Neglecting losses and using Eq. (5.4.29) P= 1 ๏ด 0.95 ( SIL ) sin 35๏ฐ ๏ฆ 2๏ฐ ( 300 ) ๏ถ sin ๏ง radians ๏ท ๏จ 5000 ๏ธ Number of 345-kV lines = = 1.48 ( SIL ) = 1.48 ( 396.8 ) = 587.3 MW/line 2000 + 1 = 3.4 + 1 5Lines 587.3 ( 500 ) = 909.1MW SIL = 2 (b) For 500-kV lines, 275 P = 1.48 ( SIL ) = 1.48 ๏ด 909.1 = 1345.6 MW/ Line Number of 500-kV Lines = 2000 + 1 = 1.49 + 1 3Lines 1345.6 ( 765) = 2250.9 MW SIL = 2 (c) For 765-kV lines, 260 P = 1.48 ( SIL ) = 1.48 ๏ด 2250.9 = 3331.3MW/ Line Number of 765-kV lines = 2200 + 1 = 0.6 + 1 2 Lines 3331.3 5.49 (a) Using Eq. (5.4.29): 1 ๏ด 0.95 ( SIL ) sin 35๏ฐ = 1.48 ( SIL ) ๏ฆ 2๏ฐ ( 300 ) ๏ถ sin ๏ง radians ๏ท ๏จ 5000 ๏ธ P = 1.48 ( 396.8 ) = 587.3MW / 345 − kV Line P= #345-kV Lines = 3200 + 1 = 5.4 + 1 7 Lines 587.3 P = 1.48 ( 909.1) = 1345.5MW / 500 − kV Line #500-kV Lines = 3200 + 1 = 2.4 + 1 4 Lines 1345.5 113 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. P = 1.48(2250.9) = 3331.3MW / 765 − kV Line #765-kV Lines = (b) P = 3200 + 1 = 0.96 + 1 2 Lines 3331.3 (1)(.95)( SIL )( sin 35๏ฐ ) = 1.131 SIL ( ) 2๏ฐ ๏ด 400 ๏ฆ ๏ถ sin ๏ง radians ๏ท ๏จ 5000 ๏ธ P = 1.131( 396.8 ) = 448.8 MW / 345 − kV Line #345-kV Lines = 2000 + 1 = 4.5 + 1 = 6 Lines 448.8 P = (1.131)( 909.1) = 1028.3MW / 500 kV Line #500-kV Lines = 2000 + 1 = 1.94 + 1 = 3Lines 1028.3 P = (1.131)( 2250.9 ) = 2545.9 MW / 765 kV Line #765-kV Lines = 5.50 2000 + 1 = 0.79 + 1 = 2 Lines 2545.9 ๏ข l = ( 9.46 ๏ด 10−4 ) ( 300 )(180 / ๏ฐ ) = 16.26๏ฐ Real power for one transmission circuit P = 4000 / 4 = 1000 MW From the practical line loadability, P3๏ฆ = or 1000 = VS puVR pu ( SIL ) sin ๏ข l sin ๏ค (1.0)(0.9)( SIL) sin(36.87๏ฐ) sin16.26๏ฐ From which SIL = 518.511MW 2 Since SIL = ๏ฉ( kVL rated ) Z C ๏น MW ๏บ๏ป ๏ซ๏ช kVL = Z C ( SIL ) = ( 343) (518.5) = 422kV 114 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 5.51 To show: PR + jQR = | VR || VS | ๏๏ข − ๏ค |B| − | A || VR |2 ๏๏ข − ๏ก |B| (a) The phasor diagram corresponding to the above equation is shown below: (b) By shifting the origin from 0๏ข to 0, the power diagram is shown in Fig. (b) above. For a given load and a given value of | VR | , 0๏ข A = | VR | | VS | | B | the loci of point A will be a set of circles of radii 0๏ข A, one for each of the set of values of | VS | . Portions of two such circles (known as receiving-end circles) are shown below:δ (c) Line 0A in the figure above is the load line whose intersection with the power circle determines the operating point. Thus, for a load (with a lagging power-factor angle ๏ฑ R ) A and C are the operating points corresponding to sending-end voltages | VS1 | and | VS 2 | , respectively. These operating points determine the real and reactive power received for the two sending-end voltages. The reactive power that must be supplied at the receiving end in order to maintain constant | VR | when the sending-end voltage decreases from | VS1 | to | VS 2 | is given by AB, which is parallel to the reactive-power axis. 115 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 5.52 (a) See Problem 5.37(a) solution: Eqs. (1) and (2) with the substitution of Z ๏ข for Z , adding the contribution of the complex power consumed by Y ๏ข / 2 , using Eq. (1) of Problem 5.37(a) solution, one gets S12 = Y ๏ข* 2 V12 V1V2 j๏ฑ12 V1 + * − * e ๏ฌ 2 Z Z Similarly, subtracting the complex power consumed in Y๏ข (on the right-hand side in Fig. 2 5.17), For the received power, one has −S21 = − Y ๏ข* 2 V22 V1V2 − j๏ฑ12 V2 − * + * e ๏ฌ 2 Z๏ข Z๏ข Except for the additional constant terms, the equations have the same form as those in Problem 5.37. (b) For a lossless line, ZC = L / C is purely real and ๏ง = j ๏ข is purely imaginary. Also Y๏ข = Y tanh ( ๏ง l / 2 ) ๏ง l /2 = j๏ท c tan ( ๏ข l / 2 ) ๏ขl / 2 and Z ๏ข = Z C sinh(๏ง l ) which becomes jZC sinh( ๏ข l ) . Note: Y ๏ข is now the admittance of a pure capacitance; Z ๏ข is now the impedance of a pure inductance. Active power transmitted, P12 = − P21 And P12 = V12 sin ๏ฑ12 ๏ฌ Z C sin ( ๏ข l ) Using Eq. (5.4.21) of the text for SIL P12 = PSIL sin ๏ฑ12 ๏ฌ sin ( ๏ข l ) (c) For ๏ข l = 0.002l radians = (0.1146l )๏ฐ , and ๏ฑ12 = 45๏ฐ , Applying the result of part (b), one gets P12 1 = 0.707 ๏ฌ PSIL sin ( 0.1146l ) ๏ฐ 116 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (d) Thermal limit governs the short lines; ๏ผ ๏ฝ ๏ฌ Stability limit prevails for long lines. ๏พ 5.53 The maximum power that can be delivered to the load is 10,250 MW. 5.54 For 8800 MW at the load the load bus voltage is maintained above 720 kV even if 2 lines are taken out of service (8850 MW may be OK since the voltage is 719.9 kV). 5.55 From Problem 5.23, the shunt admittance of the equivalent ๏ฐ circuit without compensation is Y ๏ข = G๏ข + jB๏ข = 2 (1.57 ๏ด 10−6 + j8.981๏ด 10−4 ) = (3.14 ๏ด 10−6 + j1.796 ๏ด 10 −3 ) S With 65% shunt compensation, the equivalent shunt admittance is 65 ๏ถ ๏ฆ −6 −4 Yeq = 3.14 ๏ด 10 −6 + j1.796 ๏ง 1 − ๏ท = 3.14 ๏ด 10 + j 6.287 ๏ด 10 100 ๏จ ๏ธ = 6.287 ๏ด 10 −4 ๏89.71๏ฐ S Since there is no series compensation Zeq = Z ๏ข = 134.8๏85.3๏ฐ ๏ The equivalent A parameter of the compensated line is Yeq Z eq 1 ( 6.287 ๏ด 10−4 ๏89.71๏ฐ ) (134.8๏85.3๏ฐ ) 2 2 = 0.9578๏0.22๏ฐ pu Aeq = 1 + =1+ The no-load voltage is VR NL = VS Aeq = 526.14 0.9578 = 549.6 kVL − L where VS is obtained from Problem 5.15. VR FL = 475kVL − L is the same as given in Problem 5.15, since the shunt reactors are removed at full load. Therefore % VR = VR NL − VR FL VR FL ๏ด 100 = 549.6 − 475 ๏ด 100 = 15.7% 475 117 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. The impedance of each shunt reactor is −1 ๏ฉ B๏ข ๏น ๏ฉ1 ๏น Z reactor = j ๏ช ( 0.65 ) ๏บ = j ๏ช ๏ด 1.796 ๏ด 10−3 ๏ด 0.65๏บ ๏ซ2 ๏ป ๏ซ2 ๏ป −1 = j 1713 ๏ / phase, at each end of the line. 5.56 (a) VS = 653.7 kVLL (same as Problem 5.17) Yeq = 2 ๏ฉ๏ซ6.37 ๏ด 10−7 + j 7.294 ๏ด 10 −4 (1 − 0.5 )๏น๏ป from Problem 5.24 = 1.274 ๏ด 10−6 + j 7.294 ๏ด 10−4 = 7.294 ๏ด 10−4 ๏87.5๏ฐ S Zeq = Z ๏ข = 98.25๏86.69๏ฐ ๏ Aeq = 1 + Yeq Z eq 2 =1+ 1 ( 7.294 ๏ด 10−4 ๏87.5๏ฐ ) ( 98.25๏86.69๏ฐ ) 2 = 1 + 0.0358๏174.19๏ฐ = 0.9644 + j 0.0036 = 0.9644๏0.21๏ฐ VRNL = VS / Aeq = 653.7 / 0.9644 = 677.8 kVLL % VR = 677.8 − 480 ๏ด 100 = 41.2% 480 (b) VS = 556.7 kVLL (same as Problem 5.17) VR NL = VS / A = 556.7 / 0.9644 = 577.3 kVLL % VR = 577.3 − 480 ๏ด 100 = 20.3% 480 (c) VS = 435.1kVLL (same as Problem 5.17) VR NL = VS / A = 435.1/ 0.9644 = 451.2 kVLL % VR = 451.2 − 480 ๏ด 100 = −6% 480 118 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 5.57 From Problem 5.23 Z ๏ข = R๏ข + jX ๏ข = (13.1 + j164.1) ๏ Based on 40% series compensation, half at each end of the line, the impedance of each series capacitor is Z CAP = − jX CAP = − j 1 ( 0.4 )(164.1) = − j 32.82 ๏ / phase (at each end) 2 Using the ABCD parameters from Problem 5.14, the equivalent ABCD parameters of the compensated line are ๏ฉ Aeq ๏ชC ๏ซ๏ช eq Beq ๏น ๏ฉ1 − j 32.82 ๏น ๏ฉ 0.8794๏1.09๏ฐ 134.8๏85.3๏ฐ ๏น =๏ช ๏บ ๏ช ๏บ −3 ๏บ Deq ๏ป๏บ ๏ซ0 1 ๏ป ๏ซ๏ช1.688 ๏ด 10 ๏90.2๏ฐ 0.8794๏0.66๏ฐ ๏ป๏บ compensated line Sending-end series capacitors uncompensated line ๏ฉ1 − j 32.82 ๏น ๏ช0 1 ๏บ๏ป๏บ ๏ช๏ซ receiving-end series capacitors ๏ฉ Aeq ๏ช ๏ช๏ซCeq ๐ ๐ Beq ๏น ๏ฉ0.9248๏0.64๏ฐ 86.66๏82.31๏ฐ ๏น ๏บ= Deq ๏บ ๏ช๏ช๏ซ 1.688๏90.2๏ฐ 0.9248๏0.64๏ฐ๏บ๏บ๏ป ๏ป (115 kV)(115 kV) ๐ ๐ 5.58 For 115 kV, ๐๐๐๐๐ฅ = ๐๐ฟ sin ๐ = (2๐60)(12 mH) sin 30° = 1462 MW For 50 HZ, ๐๐๐๐๐ฅ = (100 kV)(100 kV) ๐๐ ๐๐ sin ๐ = (2๐50)(12 sin 30° = 1327 MW ๐๐ฟ mH) Both changes allow more power to be transferred. 5.59 From Problem 5.57: Aeq = 0.9248 pu; ๏ฑ A = 0.64๏ฐ ๏ข = 86.66 ๏ ; ๏ฑ Zeq = 82.31๏ฐ Beq = Z eq From Eq. (5.5.6), with VS = VR = 500 kVL − L PR max = 500 ๏ด 500 0.9248(500) 2 − cos ( 82.31๏ฐ − 0.64๏ฐ ) 86.66 86.66 = 2885 − 387 = 2498 MW(3๏ฆ ) which is 46.7% larger than the value PR max = 1702 MW calculated in Problem 5.38 for the uncompensated line. 119 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 5.60 Let X eq be the equivalent series reactance of one 765-kV, 500 km, series compensated line. The equivalent series reactance of four lines with two intermediate substations and one line section outof-service is then: 1๏ฆ2 ๏ถ 1๏ฆ1 ๏ถ X eq ๏ท + ๏ง X eq ๏ท = 0.2778 X eq ๏ง 4๏จ3 ๏ธ 3๏จ 3 ๏ธ From Eq. (5.4.26) with ๏ค = 35๏ฐ, VR = 0.95per unit , and P = 9000MW; P= ( 765)(.95 ๏ด 765) sin (35๏ฐ) = 9000. .2778 Xeq Solving for X eq : N ๏ถ N ๏ถ ๏ฆ ๏ฆ X eq = 127.54 ๏ = X ๏ข ๏ง 1 − C ๏ท = 156.35 ๏ง 1 − C ๏ท ๏จ 100 ๏ธ ๏จ 100 ๏ธ Solving: N C = 18.4% series capacitive compensation ( N C = 21.6% including 4% line losses). 5.61 X ๏ข ๏ฆ NC ๏ถ 164.1 ๏ฆ 40 ๏ถ =−j ๏ง ๏ท = − j 32.82 ๏ 2 ๏ง๏จ 100 ๏ท๏ธ 2 ๏จ 100 ๏ธ B๏ข N L 2.272 ๏ด 10−3 ๏ฆ 70 ๏ถ −3 YREAC = − j =−j ๏ง ๏ท = − j1.59 ๏ด 10 S 2 100 2 ๏จ 100 ๏ธ Z CAP = − j ๏ฉ Aeq ๏ช ๏ซ๏ชCeq 0 ๏น ๏ฉ1 − j 32.82 ๏น Beq ๏น ๏ฉ1 ๏บ=๏ช −4 1 ๏บ๏บ๏ป ๏ช๏ซ๏ช0 1 ๏บ๏ป๏บ Deq ๏ป๏บ ๏ซ๏ช − j 2.92 ๏ด 10 Sending-end shunt compensation Sending-end series compensation 134.8๏85.3๏ฐ ๏น ๏ฉ 0.8794๏1.09๏ฐ ๏ช1.688 ๏ด 10−3 ๏90.2๏ฐ 0.8794๏0.66๏ฐ๏บ ๏ด ๏ช๏ซ ๏บ๏ป Line 1 ๏ฉ1 − j 32.82 ๏น ๏ฉ ๏ด๏ช ๏บ ๏ช 1 ๏บ๏ป ๏ช๏ซ − j1.59 ๏ด 10−3 ๏ช๏ซ0 Receiving end series compensation 0๏น 1 ๏บ๏บ๏ป Receiving end shunt compensation After multiplying the above 5 matrices, the answer can be obtained. 120 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 5.62 See solution of Problem 5.18 for ๏ง l, Z C ,cosh ๏ง l, and sinh ๏ง l . (a) For the uncompensated line: A = D = cosh ๏ง l = 0.8904๏1.34๏ฐ B = Z ๏ข = ZC๏ข sinh ๏ง l = 186.78๏79.46๏ฐ ๏ C= sinh ๏ง l 0.4596๏84.94๏ฐ = = 0.001131๏90.42๏ฐ S ZC๏ข 406.4๏ − 5.48๏ฐ (b) Noting that the series compensation only alters the series arm of the equivalent ๏ฐ -circuit, the new series arm impedance is ๏ข = Bnew = 186.78๏79.46๏ฐ − j 0.7 ๏ด 230 ( 0.8277 ) = 60.88๏55.85๏ฐ ๏ Z new In which 0.8277 is the imaginary part of z = 0.8431๏79.04๏ฐ ๏ / mi Noting that A = Y ๏ข 1 cosh ๏ง l − 1 Z ๏ขY ๏ข = = 0.000399๏89.82๏ฐ S + 1 and 2 ZC๏ข sinh ๏ง l 2 Anew = ( 60.88๏55.85๏ฐ ๏ด 0.000599๏89.81๏ฐ ) + 1 = 0.97๏1.24๏ฐ ๏ฆ Z ๏ขY ๏ข ๏ถ Z ๏ขY ๏ข2 Cnew = Y ๏ข ๏ง 1 + ๏ท = Y๏ข + 4 ๏ธ 4 ๏จ = 2 ๏ด 0.000599๏89.81๏ฐ + 60.88๏55.85๏ฐ ( 0.000599๏89.81๏ฐ ) 2 = 0.00118๏90.41๏ฐ S The series compensation has reduced the parameter B to about one-third of its value for the uncompensated line, without affecting the A and C parameter appreciably. Thus, the maximum power that can be transmitted is increased by about 300%. 5.63 The shunt admittance of the entire line is Y = yl = − j 5.105 ๏ด 10 −6 ๏ด 230 = − j 0.001174S With 70% compensation, Ynew = 0.7 ๏ด (− j 0.001174) = − j 0.000822S From Fig. 5.4 of the text, for the case of ‘shunt admittance’, A = D = 1; B = 0; C = Y ๏ C = Ynew = − j 0.000822S For the uncompensated line, the A, B, C , D parameters are calculated in the solution of Problem 5.49. For ‘series networks’, see Fig.5.4 of the text to modify the parameters. So for the line with a shunt inductor, Aeq = 0.8904๏1.34๏ฐ + 186.78๏79.46๏ฐ ( 0.000822๏ − 90๏ฐ ) = 1.0411๏ − 0.4๏ฐ 121 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. The voltage regulation with the shunt reactor connected at no load is given by (137.86 /1.0411) − 124.13 = 0.0667 124.13 which is a considerable reduction compared to 0.247 for the regulation of the uncompensated line. (see solution of Problem 5.18) 5.64 (a) From the solution of Problem 5.31, ZC = 290.43 ๏; ๏ข l = 21.641๏ฐ For a lossless line, the equivalent line reactance is given by X ๏ข = ZC sin ๏ข l = (290.43)sin 21.641๏ฐ = 107.11 ๏ The receiving end power SR(3๏ฆ ) = 1000๏ cos−1 0.8 = 800 + j600MVA Since P3๏ฆ = VS ( L − L )VR( L − L ) X๏ข sin ๏ค , the power angel ๏ค is obtained from 800 = ( 500 ๏ด 500 /107.11) sin ๏ค or ๏ค = 20.044๏ฐ The receiving end reactive power is given by (approximately) QR ( 3๏ฆ ) = VS ( L − L )VR ( L − L ) X๏ข cos ๏ค − VR2( L − L ) X๏ข cos ๏ข l ( 500 ) cos 21.641๏ฐ 500 ๏ด 500 = cos ( 20.044๏ฐ ) − ( ) 107.11 107.11 = 23.15MVAR 2 Then the required capacitor MVAR is SC = j 23.15 − j 600 = − j 576.85 The capacitive reactance is given by (see Eq. 2.3.5 in text) or XC = − jVL2 − j 5002 = = 433.38 ๏ SC − j 567.85 C= 106 = 6.1๏ญ F 2๏ฐ ( 60 ) 433.38 (b) For 40% compensation, the series capacitor reactance per phase is X ser = 0.4 X ๏ข = 0.4 (107.1) = 42.84 ๏ The new equivalent ๏ฐ -circuit parameters are given by Z ๏ข = j ( X ๏ข − X ser ) = j 64.26 ๏; Y ๏ข = j 2 ๏ฆ ๏ขl ๏ถ tan ๏ง ๏ท = j 0.001316S ZC ๏จ 2 ๏ธ Bnew = j 64.26 ๏; Anew = 1 + Z ๏ขY ๏ข = 0.9577 2 122 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. The receiving end voltage per phase VR = 500 3 ๏0๏ฐ kV = 288.675๏0๏ฐ kV The receiving end current is I R = SR*(3๏ฆ ) / 3VR* Thus I R = 1000๏ − 36.87๏ฐ = 1.1547๏ − 36.87๏ฐ kA 3 ๏ด 288.675๏0๏ฐ The sending end voltage is then given by VS = AVR + B I R = 326.4๏10.47๏ฐ kV; VS ( L − L ) = 3 326.4 = 565.4 kV Percent voltage regulation = ( 565.4 / 0.958 ) − 500 ๏ด 100 = 18% 500 5.65 The maximum amount of real power which can be transferred to the load at unity pf with a bus voltage greater than 0.9 pu is 3900 MW. 123 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 5.66 124 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Chapter 6 Power Flows 6.1 10 10 10๏น ๏ฉx1 ๏น ๏ฉ0 ๏น ๏ฉ− 25 ๏ช 5 − 10 10 0๏บ๏บ ๏ช๏ชx2 ๏บ๏บ ๏ช๏ช2 ๏บ๏บ ๏ช ๏ช 10 5 − 10 10๏บ ๏ชx3 ๏บ = ๏ช1 ๏บ ๏ช ๏บ๏ช ๏บ ๏ช ๏บ 0 0 − 20๏ป ๏ช๏ซx4 ๏บ๏ป ๏ซ− 2๏ป ๏ซ 10 There are N − 1 = 3 Gauss elimination steps. Step 1: Use equation 1 to eliminate x1 from equations 2, 3, and 4. 10 10 ๏น ๏ฉ x1 ๏น ๏ฉ 0 ๏น ๏ฉ −25 10 ๏ช ๏บ ๏ช 0 −40 60 10 ๏บ๏บ ๏ช x2 ๏บ ๏ช๏ช 10 ๏บ๏บ ๏ช = ๏ช 0 22.5 −15 35 ๏บ ๏ช x3 ๏บ ๏ช 2.5๏บ ๏ช ๏บ๏ช ๏บ ๏ช ๏บ 10 10 −40 ๏ป ๏ซ x4 ๏ป ๏ซ −5 ๏ป ๏ซ 0 Step 2: Use equation 2 to eliminate x2 from equations 3 and 4. 10 10 ๏น ๏ฉ −25 10 ๏ช 0 −40 ๏บ ๏ฉ x1 ๏น ๏ฉ 0 ๏น 60 10 ๏ช ๏บ ๏ช x2 ๏บ ๏ช 10 ๏บ ๏บ ๏ช 0 0 33.33 72.22 ๏บ ๏ช๏ช ๏บ๏บ = ๏ช ๏ช14.44 ๏บ ๏ช ๏บ x3 ๏บ −150 ๏บ ๏ช ๏บ ๏ช ๏ช 0 x4 ๏ป ๏ซ −10 ๏ป 0 100 ๏ซ 9 ๏บ๏ป ๏ซ๏ช Step 3: Use equation 3 to eliminate x3 from equation 4. 10 10 ๏น ๏ฉx1 ๏น ๏ฉ 0 ๏น ๏ฉ− 25 10 ๏ช ๏บ ๏ช 0 − 40 60 10 ๏บ๏บ ๏ชx2 ๏บ ๏ช๏ช 10 ๏บ๏บ ๏ช = ๏ช 0 0 33.33 72.22 ๏บ ๏ชx3 ๏บ ๏ช14.44๏บ ๏ช ๏บ๏ช ๏บ ๏ช ๏บ 0 0 122.22๏ป ๏ช๏ซx4 ๏ป๏บ ๏ซ17.77๏ป ๏ซ 0 The matrix is now triangular. Solving via back substitution, x4 = 0.1455 x3 = 0.1182 x2 = − 0.0364 x1 = 0.0909 125 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 6.2 ๏ฉ8 2 1 ๏น ๏ฉ x1 ๏น ๏ฉ 3 ๏น ๏ช4 6 2 ๏บ ๏ช x ๏บ = ๏ช4๏บ ๏ช ๏บ๏ช 2๏บ ๏ช ๏บ ๏ช๏ซ 3 4 14 ๏บ๏ป ๏ซ๏ช x3 ๏ป๏บ ๏ซ๏ช 2 ๏ป๏บ There are N − 1 = 2 Gauss elimination steps. Step 1: Use equation 1 to eliminate x1 from equations 2 and 3. 2 1 ๏น ๏ฉ x1 ๏น ๏ฉ3 ๏ฉ8 ๏น ๏ช0 − 10 ๏บ ๏ช ๏บ ๏ช − 3 ๏บ ๏ชx2 ๏บ = ๏ช− 5 ๏บ๏บ ๏ช ๏ช๏ซ0 − 8.67 − 36.33๏บ๏ป ๏ช๏ซx3 ๏บ๏ป ๏ช๏ซ− 2.33๏บ๏ป Step 2: Use equation 2 to eliminate x2 from equation 3. 2 1 ๏น ๏ฉx1 ๏น ๏ฉ 3 ๏น ๏ฉ8 ๏ช0 − 10 − 3 ๏บ๏บ ๏ช๏ชx2 ๏บ๏บ = ๏ช๏ช − 5 ๏บ๏บ ๏ช ๏ช๏ซ0 0 38.92๏บ๏ป ๏ช๏ซx3 ๏บ๏ป ๏ช๏ซ−2.31๏บ๏ป The matrix is now triangular. Solving via back substitution, x3 = − 0.0593 x2 = 0.5178 x1 = 0.2530 6.3 ๏ฉ4 2 1 ๏น ๏ฉx1 ๏น ๏ฉ3๏น ๏ช4 6 2 ๏บ ๏ช ๏บ = ๏ช4๏บ ๏ช ๏บ ๏ชx2 ๏บ ๏ช ๏บ ๏ช๏ซ3 4 14๏บ๏ป ๏ช๏ซx3 ๏บ๏ป ๏ช๏ซ2๏บ๏ป There are N − 1 = 2 Gauss elimination steps. Step 1: Use equation 1 to eliminate x1 from equations 2 and 3. 1 ๏น ๏ฉ x1 ๏น ๏ฉ3 ๏ฉ4 2 ๏น ๏ช0 4 ๏บ ๏ช ๏บ ๏ช ๏บ 1 ๏บ ๏ชx2 ๏บ = ๏ช1 ๏ช ๏บ ๏ช๏ซ0 2.5 13.25๏บ๏ป ๏ช๏ซx3 ๏บ๏ป ๏ช๏ซ−0.25๏บ๏ป Step 2: Use equation 2 to eliminate x2 from equation 3. 1 ๏น ๏ฉx1 ๏น ๏ฉ 3 ๏น ๏ฉ4 2 ๏ช0 4 1 ๏บ๏บ ๏ช๏ชx2 ๏บ๏บ = ๏ช๏ช 1 ๏บ๏บ ๏ช ๏ช๏ซ0 0 12.625๏บ๏ป ๏ช๏ซx3 ๏บ๏ป ๏ช๏ซ− 0.875๏บ๏ป The matrix is now triangular. Solving via back substitution, 126 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. x3 = − 0.0693 x2 = 0.2673 x1 = 0.6337 6.4 ๏ฉ− 5 5 ๏น ๏ฉ x1 ๏น ๏ฉ 5๏น ๏ช10 − 10๏บ ๏ชx ๏บ = ๏ช− 5๏บ ๏ซ ๏ป ๏ซ 2๏ป ๏ซ ๏ป If we perform Gauss elimination, we arrive at: ๏ฉ− 5 5๏น ๏ฉ x1 ๏น ๏ฉ 5 ๏น ๏ช 0 0๏บ ๏ชx ๏บ = ๏ช2.5๏บ ๏ซ ๏ป ๏ซ 2๏ป ๏ซ ๏ป The 2nd row says that 0 x1 + 0 x2 = 2.5 Clearly, this is not possible. The problem in this case is that the system we started with is indeterminate. That is, −5 5 =0 10 − 10 This system has no solution. 6.5 From Eq. (6.1.6), back substitution is given by: Xk = yk − Ak ,k +1 X k +1 − Ak ,k + 2 X k + 2 − Ak , N X N Akk which requires one division, (N − k) multiplications and (N − k) subtractions for each k = N ,( N − 1) 1 . Summary- Back Substitution Solving for # Divisions # Multiplications # Subtractions XN 1 0 0 XN−1 1 1 1 XN−2 1 2 2 X1 1 (N−1) (N−1) N −1 Totals N ๏ฅi = i =1 N ( N − 1) 2 N −1 ๏ฅi = i =1 N ( N − 1) 2 127 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 6.6 −0.25 −0.125๏น ๏ฉ 0 ๏ช M = D −1 ( D − A) = ๏ช −0.667 0 −0.333๏บ๏บ ๏ช๏ซ −0.2143 −0.2857 0 ๏บ๏ป ๏ฉ8 0 0 ๏น D = ๏ช๏ช0 6 0 ๏บ๏บ ๏ช๏ซ0 0 14 ๏บ๏ป x (i + 1) = Mx (i) + D −1 B x1 = 0.2528 x 2 = 0.5175 x 3 = −0.0595 after 14 iterations 6.7 ๏ฉ8 0 0 ๏น ๏ฉ0 −0.2500 −0.1250 ๏น ๏ช ๏บ −1 D = ๏ช 4 6 0 ๏บ M = D ( D − A) = ๏ช๏ช0 0.1667 −0.2500 ๏บ๏บ ๏ช๏ซ 3 4 14 ๏บ๏ป ๏ช๏ซ0 0.0060 0.0982 ๏บ๏ป x (i + 1) = Mx (i ) + D −1 B x1 = 0.2531 x 2 = 0.5177 x 3 = −0.0593 after 5 iterations The Gauss-Seidel method converges over twice as fast as the Jacobi method. 6.8 ๏ฉ10 −2 −4๏น ๏ฉ x1 ๏น ๏ฉ−2๏น ๏ช− 2 6 − 2๏บ ๏ชx ๏บ = ๏ช 3๏บ ๏ช ๏บ ๏ช 2๏บ ๏ช ๏บ ๏ซ๏ช− 4 − 2 10๏บ๏ป ๏ช๏ซx3 ๏บ๏ป ๏ช๏ซ− 1๏บ๏ป ๏ฉ1 ๏ช10 ๏ช −1 D =๏ช0 ๏ช ๏ช ๏ช0 ๏ซ๏ช ๏ฉ10 0 0๏น D = ๏ช๏ช 0 6 0๏บ๏บ ๏ช๏ซ 0 0 10๏บ๏ป ๏ฉ ๏ช0 ๏ช 1 M = D −1 (D − A) = ๏ช ๏ช3 ๏ช2 ๏ช ๏ช๏ซ5 1 5 0 1 5 ๏น 0๏บ ๏บ 1 0๏บ 6 ๏บ 1๏บ 0 ๏บ 10๏บ๏ป 0 2๏น 5๏บ ๏บ 1๏บ 3๏บ ๏บ 0๏บ ๏บ๏ป Expressing in the form of Eq. (6.2.6) ๏ฉ ๏ช0 ๏ฉ x1 (i + 1)๏น ๏ช ๏ช ๏บ ๏ช1 ๏ชx2 (i + 1)๏บ = ๏ช3 ๏ช๏ซx3 (i + 1)๏บ๏ป ๏ช 2 ๏ช ๏ช๏ซ5 1 5 0 1 5 2๏น ๏ฉ1 ๏บ 5 ๏ฉ x (i)๏น ๏ช10 ๏บ 1 ๏ช 1๏บ ๏ช ๏บ x (i) + ๏ช 0 3๏บ ๏ช 2 ๏บ ๏ช ๏บ ๏ช๏ซx3 (i)๏บ๏ป ๏ช 0๏บ ๏ช0 ๏บ๏ป ๏ช๏ซ ๏น 0๏บ ๏บ ๏ฉ− 2๏น 1 0 ๏บ ๏ช๏ช 3 ๏บ๏บ 6 ๏บ 1 ๏บ ๏ช๏ซ− 1๏บ๏ป 0 ๏บ 10๏บ๏ป 0 128 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Using ๏ฉ1๏น x(0) = ๏ช๏ช1๏บ๏บ ๏ช๏ซ0๏บ๏ป we arrive at the following table: i 0 2 3 4 5 6 7 8 9 10 x1 1 0 1 0.1667 –0.04 –0.0444 –0.0962 –0.1085 –0.1239 –0.1303 –0.1355 –0.1382 x2 1 0.8333 0.6667 0.5778 0.52 0.485 0.4633 0.45 0.4418 0.4367 0.4336 x3 0 0.5 0.0667 0.1 –0.0004 –0.0138 –0.0415 –0.0507 –0.0596 –0.0638 –0.0668 ๏ฅ Inf Inf 1.24 1.0044 30 2.0095 0.2235 0.1741 0.0704 0.0484 ๏ฅ for iteration 9 is less than 0.05. ๏ x1 = − 0.14 x2 = 0.43 x3 = − 0.07 6.9 x2 − 3 x1 + 1.9 = 0 x2 + x12 − 3.0 = 0 Rearrange to solve for x1 and x2 : 1 x1 = x2 + 0.6333 3 x2 = 3.0 − x12 Starting with an initial guess of x1 (0) = 1 and x2 (0) = 1 1 x1 (1) = x2 (0) + 0.6333 = 0.9667 3 x2 (1) = 3 − [ x1 (0)]2 = 2 We repeat this procedure using the general equations 1 x1 (n + 1) = x2 (n) + 0.6333 3 x2 (n + 1) = 3 − [ x1 (n)]2 n 0 x1 1 x2 1 1 2 3 ... 0.9667 1.3 1.3219 2.0 1.31 2.0656 47 48 49 50 ... 1.1746 1.1735 1.1734 1.1743 ... 1.6205 1.6202 1.6229 1.6231 129 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. After 50 iterations, x1 and x2 have a precision of 3 significant digits. x1 = 1.17 x2 = 1.62 6.10 x2 − 4 x + 1 = 0 Rearrange to solve for x: x= 1 2 1 x + 4 4 Using the general form 1 1 x(n + 1) = [ x(n)]2 + 4 4 and x(0) = 1 we can obtain the following table: n 0 1 2 3 4 5 0.2681 x 1 0.5 0.3125 0.2744 0.2688 ๏ฅ 0.5 0.375 0.1219 0.0204 0.0028 ๏ฅ (4) = 0.0028 ๏ผ 0.01 ๏ x = 0.27 Using the quadratic formula x= −b ๏ฑ b2 − 4ac 2a 4 ๏ฑ (− 4)2 − 4 2 x = 0.268, 3.732 x= Note: There does not exist an initial guess which will give us the second solution x = 3.732. 6.11 After 100 iterations the Jacobi method does not converge. After 100 iterations the Gauss-Seidel method does not converge. 6.12 Rewriting the given equations, x1 = x2 + 0.633; 3 x2 = 1.8 − x12 With an initial guess of x1 (0) = 1 and x2 (0) = 1, update x1 with the first equation above, and x2 with the second equation. x2 (0) 1 + 0.633 = + 0.633 = 0.9663 3 3 Thus x1 = and x2 = 1.8 − x1 (0)2 = 1.8 − 1 = 0.8 130 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. In succeeding iterations, compute more generally as x1 ( n + 1) = x2 ( n ) + 0.633 3 x2 (n + 1) = 1.8 − x12 (n) and After several iterations, x1 = 0.938 and x2 = 0.917 . After a few more iterations, x1 = 0.93926 and x2 = 0.9178 . However, note that an “uneducated guess” of initial values, such as x1 (0) = x2 (0) = 100 , would have caused the solution to diverge. 6.13 x1 = ๏น 1 ๏ฉ − 1 + 0.5 j − j10 ๏ด x2 − j10๏บ − 20 j ๏ช๏ซ x1* ๏ป x2 = ๏น 1 ๏ฉ−3 + j − j10 ๏ด x1 − j10๏บ ๏ช * − 20 j ๏ซ x2 ๏ป Rewriting in the general form: x1 (n + 1) = ๏น 1 ๏ฉ − 1 + 0.5 j − j10 ๏ด x2 (n) − j10๏บ ๏ช * − 20 j ๏ซ [ x1 (n)] ๏ป x2 (n + 1) = 1 ๏ฉ −3 + j ๏น − j10 ๏ด x1 (n + 1) − j10๏บ ๏ช − 20 j ๏ซ[ x2 (n)]* ๏ป Solving using MATLAB with x1 (0) = 1, x2 (0) = 1, ๏ฅ = 0.05 : x1 = 0.91 − 0.16 j x2 = 0.86 − 0.22 j ๏ฅ = 0.036 after 3 iterations 6.14 f ( x) = x3 − 6 x 2 + 9 x − 4 = 0 1 2 4 x = − x 3 + x 2 + = g( x ) 9 3 9 Apply Gauss-Seidel algorithm with x(0) = 2. First iteration yields 1 2 4 x (1) = g (2) = − 23 + 22 + = 2.2222 9 3 9 Second iteration: x(2) = g ( 2.2222 ) = 2.5173 Subsequent iterations will result in 2.8966,3.3376, 3.7398, 3.9568, 3.9988, and 4.0000 ๏ฌ Note: There is a repeated root at x = 1 also. With a wrong initial estimate, the solution might diverge. 131 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 6.15 x2 cos x − x + 0.5 = 0 Rearranging to solve for x, x = x2 cos x + 0.5 In the general form x(n + 1) = [ x(n)]2 cos x(n) + 0.5 Solving using MATLAB with x(0) = 1, ๏ฅ = 0.01: x = 1.05 ๏ฅ = 0.007 after 2 iterations To test which initial guesses result in convergence, we use MATLAB and try out initial guesses between − 20 and 20, with a resolution of 0.001. In the following plot the curve is the original function we solved. The shaded area is the values of x(0) which resulted in convergence. 6.16 Eq. (6.2.6) is: x (i + 1) = Mx (i ) + D −1 y Taking the Z transform (assume zero initial conditions): zX ( z ) = MX ( z ) + D −1Y ( z ) ( zU − M ) X (z) = D −1Y (z) −1 X ( z) = ( zU − M ) D −1Y ( z ) = G( z )Y ( z ) 132 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 6.17 For Jacobi, ๏ฉ A11 M = D −1 ( D − A) = ๏ช ๏ช๏ซ 0 ๏ฉ ๏ช Z Det ( ZU − M ) = Det ๏ช ๏ช A21 ๏ช A ๏ซ๏ช 22 0 ๏น A22 ๏บ๏บ๏ป −1 ๏ฉ 0 ๏ช− A ๏ช๏ซ 21 − A12 ๏น A11 ๏บ ๏บ ๏บ 0 ๏บ ๏บ๏ป ๏ฉ 0 − A12 ๏น ๏ช๏ช = 0 ๏บ๏บ๏ป ๏ช − A21 ๏ช ๏ช๏ซ A22 A12 ๏น A11 ๏บ ๏บ = Z 2 − A12 A21 = 0 ๏บ A11 A22 Z ๏บ ๏ป๏บ ๏ฆA A ๏ถ Z = ๏ฑ ๏ง 12 21 ๏ท ๏จ A11 A22 ๏ธ For Gauss-Seidel, − A12 ๏น ๏ฉ 0 ๏ช A11 ๏บ ๏ฉ A11 0 ๏น ๏ฉ 0 − A12 ๏น ๏ช ๏บ −1 M = D ( D − A) = ๏ช = ๏บ ๏ช 0 ๏บ๏บ๏ป ๏ช A12 A21 ๏บ ๏ช๏ซ A21 A22 ๏บ๏ป ๏ช๏ซ0 ๏ช0 ๏บ A11 A22 ๏บ ๏ช๏ซ ๏ป A12 ๏ฉ ๏น ๏ชZ ๏บ A11 ๏บ = Z ๏ฆ Z − A12 A21 ๏ถ = 0 det ( ZU − M ) = Det ๏ช ๏ง ๏ท ๏ช A12 A21 ๏บ A11 A22 ๏ธ ๏จ ๏ช0 Z − ๏บ A11 A22 ๏บ ๏ช๏ซ ๏ป A A Z = 0, 12 21 A11 A22 −1 When N = 2 , both Jacobi and Gauss-Seidel converge if and only if 6.18 A12 A21 ๏ผ 1. A11 A22 x3 + 8 x 2 + 2 x − 40 = 0 x(0) = 1 J (i) = df = [3x 2 + 16 x + 2]x = x (i ) dx x = x (i ) In the general form: x(i + 1) = x(i) + 1 ๏ด (− x(i)3 − 8 x(i)2 − 2 x(i) + 40) 3x(i) + 16 x(i) + 2 2 133 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Using x(0) = 1, we arrive at i 0 1 2 3 4 1.9106 x 1 2.381 1.9675 1.9116 ๏ฅ 1.381 0.1737 0.0284 5.19E-4 After 4 iterations, ๏ฅ ๏ผ 0.001. ๏ x = 1.9106 6.19 Repeating Problem 6.18 with x(0) = −2, we get: i 0 1 2 3 –3.0528 x –2 –3.111 –3.0526 ๏ฅ 0.5556 0.0188 7.58E-5 After 3 iterations, ๏ฅ ๏ผ 0.001 . Therefore, x = − 3.0528 Changing the initial guess from 1 to − 2 caused the Newton-Raphson algorithm to converge to a different solution. 6.20 x 4 + 3 x 3 − 15 x 2 − 19 x + 30 = 7 J (i) = df = [4 x 3 + 9 x 2 − 30 x − 19]x = x (i ) dx x = x (1) In general form x(i + 1) = x(i) + 1 ๏ด (7 − x(i)4 − 3x(i)3 + 15 x(i) 2 + 19 x(i) − 30) 4 x(i)3 + 9 x(i)2 − 30 x(i) − 19 Using x(0) = 0, we arrive at: i 0 1 2 3 4 x 0 1.211 0.796 0.804 0.804 ๏ฅ ๏ฅ 0.342 0.010 8.7E-6 After 4 iterations, ๏ฅ ๏ผ 0.001. Therefore, x = 0.804 134 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 6.21 Repeating Problem 6.20 with x(0) = 4, we arrive at x = 3.082 after 4 iterations. 6.22 For points near x = 2.2, the function is flat, meaning the Jacobian is close to zero. In Newton-Raphson, we iterate using the equation x(i + 1) = x(i) + J −1 (i)[ y − f ( x(i))] If J (i) is close to zero, J −1 (i) will be a very large positive or negative number. If we use an initial guess of x(0) which is near 2.2, the first iteration will cause x(i) to jump to a point far away from the solution, as illustrated in the following plot: 135 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 6.23 (a) e x1 x2 − 1.2 = 0 cos( x1 + x2 ) − 0.5 = 0 ๏ฉx2 e x1 x2 ๏น x1e x1x2 df J (i) = =๏ช dx x = x (i ) ๏ซ− sin( x1 + x2 ) − sin( x1 + x2 )๏บ๏ป x = x (i ) In general form x(i + 1) = x(i) − J −1 (i) f ( x) Solving using MATLAB with x1 (0) = 1, x2 (0) = 1, ๏ฅ = 0.001: i 0 1 2 3 4 5 x1 1 0.6836 0.8956 0.8315 0.8267 0.8266 x2 0.5 0.3860 0.1518 0.2157 0.2205 0.2206 ๏ฅ - 0.3164 0.6068 0.4210 0.0226 0.0001 After 5 iterations ๏ฅ ๏ผ 0.005. Therefore, x1 = 0.8266 x2 = 0.2206 (b) When the initial conditions are changed, the solution diverges as each iteration results in very large solutions (on the order of 1e83 ). The error is (until the program fails): 1e82 ๏ด ๏ฅ 6.24 - 0 4.9335 NaN 0 0 2 x1 + x22 − 8 = 0 x12 − x22 + x1 x2 − 3 = 0 J (i) = ๏ฉ2 df =๏ช dx x = x (i ) ๏ซ2 x1 + x2 2 x2 ๏น − 2 x2 + x1๏บ๏ป x = x (i ) In general form x(i + 1) = x(i) − J −1 (i) f ( x) Solving using MATLAB with x1 (0) = 1, x2 (0) = 1, ๏ฅ = 0.001: i 0 1 2 3 4 x1 1 1.9 1.6875 1.6743 1.6743 x2 1 1.7 1.5543 1.5471 1.5471 ๏ฅ 0.9 0.2125 0.0132 5.037E-5 After 4 iterations ๏ฅ ๏ผ 0.001. Therefore, x1 = 1.6743 x2 = 1.5471 136 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 6.25 10 x1 sin x2 + 2 = 0 10 x12 − 10 x1 cos x2 + 1 = 0 J (i) = 10 x1 sin x2 ๏น ๏ฉ10sin x2 df =๏ช dx x = x (i ) ๏ซ20 x1 − 10 cos x2 10 x1 sin x2 ๏บ๏ป x = x (i ) In the general form x(i + 1) = x(i) − J −1 (i) f ( x) Solving using MATLAB with x1 (0) = 1, x2 (0) = 0, ๏ฅ = 1E − 4 : i 0 1 2 3 4 x1 1 0.90 0.8587 0.8554 0.8554 x2 0 – 0.20 – 0.2333 – 0.2360 – 0.2360 ๏ฅ ๏ฅ 0.1667 0.01131 7.0E-5 After 4 iterations, Newton-Raphson converges to x1 = 0.8554 rad x2 = − 0.2360 rad 6.26 Repeating Problem 6.25 with x1 (0) = 0.25 and x2 (0) = 0, Newton-Raphson converges to x1 = 0.2614 rad x2 = − 0.8711 rad after 6 iterations. 6.27 To determine which values of x1 (0) result in the answer obtained in Problem 6.25, we test out initial guesses for x1 between 0 and 1, with a resolution of 0.0001. The conclusion of this search is that if 0.5 ๏ผ x1 (0) ๏ฃ 1 and x2 (0) = 0, Newton-Raphson will converge to x1 = 0.8554 rad and x2 = − 0.2360 rad. Note: If x1 (0) = 0.5 and x2 (0) = 0. Newton-Raphson does not converge. This is because ๏ฉ4.79 5๏น J (0) = ๏ช ๏บ 0๏ป ๏ซ 0 Thus, J −1 does not exist. 6.28 (a) ๐11 = 2 − ๐4 + 3 − ๐6 = 5 − ๐10 ๐22 = 2 − ๐4 ๐33 = 3 − ๐6 ๐12 = ๐21 = −2 + ๐4 ๐13 = ๐31 = −3 + ๐6 137 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๐23 = ๐32 = 0 (b) ๐๐ = ๐๐ ∑๐ ๐=1 ๐๐ [๐บ๐๐ cos(๐ฟ๐ − ๐ฟ๐ ) + ๐ต๐๐ sin(๐ฟ๐ − ๐ฟ๐ )] At bus 2, ๐2 = ๐2 [๐บ21 ๐1 cos(๐ฟ2 − ๐ฟ1 ) + ๐ต21 ๐1 sin(๐ฟ2 − ๐ฟ1 ) + ๐บ22 ๐2 cos(๐ฟ2 − ๐ฟ2 ) + ๐ต22 ๐2 sin(๐ฟ2 − ๐ฟ2 ) + ๐บ23 ๐3 cos(๐ฟ2 − ๐ฟ3 ) + ๐ต23 ๐3 sin(๐ฟ2 − ๐ฟ3 )] 1.5 = 1.1[(1)(−2) cos(๐ฟ2 ) + (1)(4) sin ๐ฟ2 + (2)(1.1)] Solve for ๐ฟ2 = 15.795° (c) At bus 3 ๐3 = ๐3 [๐บ31 ๐1 cos(๐ฟ3 − ๐ฟ1 ) + ๐ต31 ๐1 sin(๐ฟ3 − ๐ฟ1 ) + ๐บ32 ๐2 cos(๐ฟ3 − ๐ฟ2 ) + ๐ต32 ๐2 sin(๐ฟ3 − ๐ฟ2 ) + ๐บ33 ๐3 cos(๐ฟ3 − ๐ฟ3 ) + ๐ต33 ๐3 sin(๐ฟ3 − ๐ฟ3 )] ๐3 = ๐3 [๐บ31 ๐1 sin(๐ฟ3 − ๐ฟ1 ) − ๐ต31 ๐1 cos(๐ฟ3 − ๐ฟ1 ) + ๐บ32 ๐2 sin(๐ฟ3 − ๐ฟ2 ) − ๐ต32 ๐2 cos(๐ฟ3 − ๐ฟ2 ) + ๐บ33 ๐3 sin(๐ฟ3 − ๐ฟ3 ) − ๐ต33 ๐3 cos(๐ฟ3 − ๐ฟ3 )] Which lead to the following two equations −1.5 = ๐3 (−3 cos ๐ฟ3 + 6 sin ๐ฟ3 + 3๐3 ) 0.8 = ๐3 (−3 sin ๐ฟ3 − 6 cos ๐ฟ3 + 6๐3 )* Solve using substitution, ๐3 = 0.9723, ๐ฟ3 = −15.10° (d) At bus 1 ๐1 = ๐1 [๐บ11 ๐1 cos(๐ฟ1 − ๐ฟ1 ) + ๐ต11 ๐1 sin(๐ฟ1 − ๐ฟ1 ) + ๐บ12 ๐2 cos(๐ฟ1 − ๐ฟ2 ) + ๐ต12 ๐2 sin(๐ฟ1 − ๐ฟ2 ) + ๐บ13 ๐3 cos(๐ฟ1 − ๐ฟ3 ) + ๐ต13 ๐3 sin(๐ฟ1 − ๐ฟ3 )] = (1)[(5)(1) cos(0) + (−10)(1) sin(0) + (−2)(1.1) cos(0 − 15.795°) + (4)(1.1) sin(0 − 15.695°) + (−3)(0.9723) cos(0 + 15.10°) + (6)(0.9623) sin 0 + 15.10°)] = 0.39 (e) ๐๐๐๐ ๐ = ๐๐๐๐ − ๐๐๐๐๐ = 0.39 + 1.5 − 1.5 = 0.39 ๐๐๐ − ๐ข๐๐๐ก 138 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๐21 = 0 6.29 1 1 1.72 0.88 ๐22 = 0.009+๐0.1 + 0.009+๐0.100 + ๐ ( 2 ) + ๐ ( 2 ) = 1.79 − ๐18.54 ๐23 = 0 1 ๐24 = ๐25 = − 0.009+๐0.1 = −0.893 + ๐9.92 6.30 6.25 − j18.695 − 5.00 + j15.00 − 1.25 + j3.75 0 0 − 5.00 + j15.00 12.9167 − j38.665 − 1.6667 + j 5.00 − 1.25 + j3.75 − 5.00 + j15.00 − 1.25 + j3.75 − 1.6667 + j 5.00 8.7990 − j 32.2294 − 5.8824 + j 23.5294 0 0 − 1.25 + j3.75 − 5.8824 + j 23.5294 9.8846 − j 36.4037 − 2.7523 + j 9.1743 0 − 5.00 + j15.00 0 − 2.7523 + j 9.1743 7.7523 − j 24.1443 6.31 First, we need to find the per-unit shunt admittance of the added capacitor. 75 Mvar = 0.75 p.u. To find Y, we use the relation S = V 2Y Y= S 0.75 = 2 = 0.75 p.u. V2 1 Now, we can find Y44 1 1 1 + + 0.08 + j 0.24 0.01 + j 0.04 0.03 + j 0.10 0.05 + 0.01 + 0.04 +j + j 0.75 2 = 9.8846 − j35.6537 Y44 = 6.32 Assume flat start V1 (0) = 1.0 ๏ 0, V2 (0) = 1.0 ๏ 0 139 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. V2 (i + 1) = 1 ๏ฉ P2 − jQ2 ๏น − Y21V1 (i)๏บ Y22 ๏ช๏ซ V2* (i) ๏ป 1 = − 4 + j8 0.05 + j 0.1 1 Y22 = = 4 − j8 0.05 + j 0.1 Y21 = − Using MATLAB, with V1 (0) = 1.0 ๏ 0 and V2 (0) = 1.0 ๏ 0 : i 0 V2 1.0 ๏ 0 1 0.9264 ๏ − 3.0941 ๏ฐ 2 3 0.9176๏ − 3.0941 ๏ฐ 0.9168 ๏ − 3.1263 ๏ฐ After 3 iterations, V2 = 0.9168 ๏ − 3.1263 ๏ฐ 6.33 If we repeat Problem 6.32 with V2 (0) = 1.0 ๏ 30 ๏ฐ, we get V2 = 0.9172 ๏ − 3.1449 ๏ฐ after 3 iterations. 6.34 V1 = 1.0 ๏ 0 V2 (i + 1) = 1 ๏ฉ P2 − jQ2 ๏น − Y21V1 − Y23V3 (i)๏บ * ๏ช Y22 ๏ซ V2 (i) ๏ป = 1 ๏ฉ − 1 + j 0.5 ๏น − j 5V1 − j 5V3 (i)๏บ − j10 ๏ช๏ซ V2* (i) ๏ป V3 (i + 1) = ๏น 1 ๏ฉ P3 − jQ3 − Y31V1 − Y32V2 (i + 1)๏บ Y33 ๏ช๏ซ V3* (i) ๏ป = ๏น 1 ๏ฉ − 1.5 + j 0.75 − j5V1 − j 5V2 (i + 1)๏บ ๏ช * − j10 ๏ซ V3 (i) ๏ป Solving using MATLAB with V2 (0) = 1.0 ๏ 0 and V3 (0) = 1.0 ๏ 0 : i 0 1 2 V2 1.0 ๏ 0 0.9552 ๏ − 6.0090 ๏ฐ 0.9090 ๏ − 12.6225 ๏ฐ V3 1.0 ๏ 0 0.9220 ๏ − 12.5288 ๏ฐ 0.8630 ๏ − 16.1813 ๏ฐ After 2 iterations, V2 = 0.9090 ๏ − 12.6225 ๏ฐ V3 = 0.8630 ๏ − 16.1813 ๏ฐ 140 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 6.35 Repeating Problem 6.34 with V1 = 1.05 ๏ 0 i 0 1 2 V2 1.0 ๏ 0 0.9801 ๏ − 5.8560 ๏ฐ 0.9530 ๏ − 11.8861 ๏ฐ V3 1.0 ๏ 0 0.9586 ๏ − 120426 ๏ฐ 0.9129 ๏ − 14.9085 ๏ฐ After 2 iterations, V2 = 0.9530 ๏ − 11.8861 ๏ฐ V3 = 0.9129 ๏ − 14.9085 ๏ฐ 6.36 V21 = ๏น 1 ๏ฉ P2 − jQ2 − Y21V1 − Y23V30 − Y24V40 ๏บ ๏ช 0 * Y22 ๏ซ (V2 ) ๏ป = ๏น 1 ๏ฉ 0.5 + j 0.2 − 1.04(−2 + j 6) − (−0.666 + j 2) − ( −1 + j3) ๏บ ๏ช Y22 ๏ซ 1 − j 0 ๏ป = 4.246 − j11.04 = 1.019 + j 0.046 = 1.02๏2.58๏ฐ p.u. 3.666 − j11 V22 = ๏น 1 ๏ฉ P2 − jQ2 1 1 ๏ช − Y V − Y V − Y V 21 1 23 3 24 4 ๏บ Y22 ๏ช (V21 )* ๏บ๏ป ๏ซ Determine V31 and V41 in the same way as V21 . Then V22 = 1 ๏ฉ 0.5 + j 0.2 − 1.04(−2 + j 6) − (−0.666 + j 2.0)(1.028 − j 0.087) Y22 ๏ช๏ซ1.019 + j 0.046 − (−1 + j 3)(1.025 − j 0.0093) ๏ = 4.0862 − j11.6119 = 1.061 + j 0.0179 = 1.0616๏0.97๏ฐ p.u. 3.666 − j11.0 6.37 Gauss-Seidel iterative scheme: With ๏ค 2 = 0;V3 = 1 p.u.; ๏ค 3 = 0 (starting values) Given Also given ๏ฉ 7 −2 −5 ๏น YBus = − j ๏ช๏ช −2 6 −4 ๏บ๏บ ; ๏ช๏ซ −5 −4 9 ๏บ๏ป V1 = 1.0๏0๏ฐ p.u. V2 = 1.0 p.u.; P2 = 60 MW P3 = −80 MW; Q3 = −60 M var (lag) 141 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Iteration 1: Q2 = − Im(Y22V2 + Y21V1 + Y23V3 )V2* = − Im ๏ป๏ − j 6(1๏0) + j 2(1๏0) + j 4(1๏0) ๏1๏0๏ฝ = 0 V2 = = ๏ถ 1 ๏ฆ P2 − jQ2 − Y21V1 − Y23V3 ๏ท ๏ง * Y22 ๏จ V2 ๏ธ 1 ๏ฉ 0.6 + j 0 ๏น − j 2(1๏0) − j 4(1๏0) ๏บ ๏ช − j 6 ๏ซ 1๏0 ๏ป = 1 + j 0.1 1๏5.71๏ฐ Repeat: V2 = 1 + 0.1๏90๏ฐ = 0.99005 + j 0.0995 1๏ − 5.71๏ฐ = 0.995๏5.74๏ฐ V2 = 1๏5.74๏ฐ = 0.995 + j 0.1 V3 = = ๏น 1 ๏ฉ P3 − jQ3 − Y31V1 − Y32V2 ๏บ ๏ช * Y33 ๏ซ V3 ๏ป 1 ๏ฉ −0.8 + j 0.6 ๏น − j 5 (1๏0 ) − j 4 ( 0.995 + j 0.1) ๏บ ๏ช − j 9 ๏ซ 1๏0 ๏ป 0.1111๏53.13๏ฐ 1๏0 = 0.9311 − j 0.0444 = 0.9322๏ − 2.74๏ฐ = 0.9978 + j 0.0444 − Repeat: V3 = 0.9978 + j 0.0444 − 0.1111๏53.13๏ฐ 0.9322๏2.74๏ฐ = 0.9218 − j 0.0474 = 0.923๏ − 2.94๏ฐ Check: ๏V2 = (0.995 + j 0.100) − (1 − j 0) = −0.005 + j 0.1 ๏V3 = (0.9218 + j 0.0474) − (1 − j 0) = −0.0782 − j 0.0474 ๏xmax = 0.1 Iteration 2: Q2 = − Im ๏ป๏ − j 6(0.995 + j 0.1) + j 2(1๏0) + j 4(0.9218 − j 0.0474)๏ (0.995 − j 0.1)๏ฝ = 0.36 V2 = 1 ๏ฉ 0.6 − j 0.36 ๏น − j 2(1๏0) − j 4(0.9218 − j 0.0474) ๏บ ๏ช − j 6 ๏ซ 1๏ − 5.74๏ฐ ๏ป = 0.9479 + j 0.316 + 0.1166๏59.04 = 1๏4.24 = 0.9973 + j 0.0739 1๏ − 5.74 142 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. V2 = 0.9479 − j 0.0316 + Repeat: 0.1166๏59.04 = 1.0003 + j 0.0725 1๏ − 4.24 1๏4.15 = 0.9974 + j 0.0723 V3 = 1 ๏ฉ −0.8 + j 0.6 ๏น − j 5(1๏0) − j 4(0.9974 + j 0.0723) ๏บ ๏ช j 9 ๏ซ 0.9230๏2.94 ๏ป = 0.9988 + j 0.0321 − 0.1111๏53.13๏ฐ = 0.9217 − j 0.0604 0.923๏2.94 = 0.9237๏ − 3.75 V3 = 0.9988 + j 0.0321 − Repeat: 0.1111๏53.13๏ฐ = 0.9205 − j 0.0592 0.9237๏3.75๏ฐ = 0.9224๏ − 3.68 ๏V2 = (0.9974 + j 0.0732) − (0.995 + j 0.1) = 0.0024 − j 0.0277 Check: ๏V3 = (0.9205 − j 0.0592) − (0.9218 − j 0.0474) = −0.0013 − j 0.0118 ๏xmax = 0.028 Third iteration yields the following results within the desired tolerance: ๏ผ๏ฏ ๏ฝ ๏ฌ V3 = 0.9208 − j 0.0644 = 0.923๏ − 4๏ฐ๏ฏ๏พ V2 = 0.9981 + j 0.0610 = 1๏3.5๏ฐ 6.38 First, convert all values to per-unit ๐ ๐๐๐ข = ๐ −180 = 100 MW = −1.8 ๐๐๐ ๐ ๐๐๐ข = ๐ MVA ๐ −60 MW ๐๐๐ ๐ = 100 Δ๐ฆ MVA = −0.6 0.1 Δ๐ฆmax,pu = ๐ max = 100 MVA = 10−4 ๐๐๐ ๐ MVA Since there are 2 buses, we need to solve 2(n-1)=2 equations. Therefore, J has dimension 2x2. Using Table 6.5 ๐ฝ122 = ๐2 ๐1 (−๐บ12 sin(๐ฟ2 − ๐ฟ1 ) + ๐ต12 cos(๐ฟ2 − ๐ฟ1 )) 143 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๐ฝ222 = 2๐2 ๐บ22 + ๐2 ๐1 (๐บ12 cos(๐ฟ2 − ๐ฟ1 ) + ๐ต12 sin(๐ฟ2 − ๐ฟ1 )) ๐ฝ322 = ๐2 ๐1 (๐บ12 cos(๐ฟ2 − ๐ฟ1 ) + ๐ต12 sin(๐ฟ2 − ๐ฟ1 )) ๐ฝ422 = 2๐2 ๐ต22 + ๐2 ๐1 (๐บ12 sin(๐ฟ2 − ๐ฟ1 ) − ๐ต12 cos(๐ฟ2 − ๐ฟ1 )) Also, ๐๐๐ข๐ = [ −๐10 ๐10 ๐10 ] −๐10 Finally, using Eqs. (6.6.2 and 6.6.3), ๐2 (๐ฟ2 , ๐2 ) = ๐2 (๐1 (๐บ21 cos(๐ฟ2 − ๐ฟ1 ) + ๐ต21 sin(๐ฟ2 − ๐ฟ1 )) + ๐2 ๐บ22 ) ๐2 (๐ฟ2 , ๐2 ) = ๐2 (๐1 (๐บ21 sin(๐ฟ2 − ๐ฟ1 ) − ๐ต21 cos(๐ฟ2 − ๐ฟ1 )) − ๐2 ๐ต22 ) 6.39 If we repeat Problem 6.38 with V2 (0) = 1.0 ๏ 30 ๏ฐ, Newton-Raphson converges to 0.9149 ๏ − 11.347 ๏ฐ after 5 iterations. 6.40 If we repeat Problem 6.38 with V2 (0) = 0.25 ๏0 ๏ฐ, Newton-Raphson converges to V2 = 0.2074 ๏ − 1140.2 ๏ฐ after 5 iterations. 6.41 The number of equations is 2(n − 1) = 4. Therefore, J will have dimension 4 ๏ด 4. Using Table 6.5 ๏ฉ10 − 5 0 0๏น ๏ช− 2 7 0 0๏บ๏บ ๏ช J (0) = ๏ช 0 0 10 − 5๏บ ๏ช ๏บ ๏ซ 0 0 − 2 13๏ป 6.42 First, we convert the mismatch into per-unit 0.1 MVA = 1E-4 p.u. with Sbase = 100 MVA. Solving using MATLAB with V2 (0) = 1.0 ๏ 0 and V3 (0) = 1.0 ๏ 0, i 0 V2 V3 1 2 3 4 1.0 ๏ 0 0.8833 ๏ − 13.3690 ๏ฐ 0.8145 ๏ − 16.4110 ๏ฐ 0.8019 ๏ − 16.9610 ๏ฐ 0.8015๏ − 16.9811 ๏ฐ 1.0 ๏ 0 0.8667 ๏ − 15.2789 ๏ฐ 0.7882 ๏ − 19.2756 ๏ฐ 0.7731 ๏ − 20.1021 ๏ฐ 0.7725 ๏ − 20.1361 ๏ฐ After 4 iterations, Newton-Raphson converges to V2 = 0.8015 ๏ − 16.9811 ๏ฐ V3 = 0.7725 ๏ − 20.1361 ๏ฐ 144 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 6.43 First, form the Y-bus −๐12.5 ๐10 −๐15 ๐ฬ ๐๐ข๐ = [ ๐10 ๐2.5 ๐5 ๐2.5 ๐5 ] −๐7.5 ๐ฟ2 (0) = ๐ฟ3 (0) = 0°; ๐2 (0) = 1.0 Compute Δ๐ฆ(0) ๐2 (๐) = ๐2 (๐1 (๐บ21 cos(๐ฟ2 − ๐ฟ1 ) + ๐ต21 sin(๐ฟ2 − ๐ฟ1 )) + ๐2 ๐บ22 + ๐3 (๐บ23 cos(๐ฟ2 − ๐ฟ3 ) + ๐ต23 sin(๐ฟ2 − ๐ฟ3 ))) = 0 ๐3 (๐) = ๐3 (๐1 (๐บ31 cos(๐ฟ3 − ๐ฟ1 ) + ๐ต31 sin(๐ฟ3 − ๐ฟ1 )) + ๐2 (๐บ32 cos(๐ฟ3 − ๐ฟ2 ) + ๐ต32 sin(๐ฟ3 − ๐ฟ2 )) + ๐3 ๐บ33 ) = 0 ๐2 (๐) = ๐2 (๐1 (๐บ21 sin(๐ฟ2 − ๐ฟ1 ) − ๐ต21 cos(๐ฟ2 − ๐ฟ1 )) − ๐2 ๐ต22 + ๐3 (๐บ23 sin(๐ฟ2 − ๐ฟ3 ) − ๐ต23 cos(๐ฟ2 − ๐ฟ3 ))) = 0 ๐2 − ๐2 (๐) −2.0 − 0 −2 Δ๐ฆ(0) = [ ๐3 − ๐3 (๐) ] = [ 1.0 − 0 ] = [ 1 ] −0.5 − 0 −0.5 ๐2 − ๐2 (๐) Compute ๐ฝ(0) (see Table 6.5) ๐ฝ122 = ๐2 (๐1 (−๐บ12 sin(๐ฟ2 − ๐ฟ1 ) + ๐ต12 cos(๐ฟ2 − ๐ฟ1 )) + ๐3 (−๐บ32 sin(๐ฟ2 − ๐ฟ3 ) + ๐ต32 cos(๐ฟ2 − ๐ฟ3 ))) = 15 ๐ฝ123 = ๐2 ๐3 (๐บ23 sin(๐ฟ2 − ๐ฟ3 ) − ๐ต23 cos(๐ฟ2 − ๐ฟ3 )) = −5 ๐ฝ132 = ๐3 ๐2 (๐บ32 sin(๐ฟ3 − ๐ฟ2 ) − ๐ต32 cos(๐ฟ3 − ๐ฟ2 )) = −5 ๐ฝ133 = ๐3 (๐1 (−๐บ13 sin(๐ฟ3 − ๐ฟ1 ) + ๐ต13 cos(๐ฟ3 − ๐ฟ1 )) + ๐2 (−๐บ23 sin(๐ฟ3 − ๐ฟ2 ) + ๐ต23 cos(๐ฟ3 − ๐ฟ3 ))) = 7.5 ๐ฝ222 = 2๐2 ๐บ22 + ๐2 (๐1 (๐บ12 cos(๐ฟ2 − ๐ฟ1 ) + ๐ต12 sin(๐ฟ2 − ๐ฟ1 )) + ๐3 (๐บ32 cos(๐ฟ2 − ๐ฟ3 ) + ๐ต32 sin(๐ฟ2 − ๐ฟ3 )) ) = 0 ๐ฝ232 = ๐3 (๐บ32 cos(๐ฟ3 − ๐ฟ2 ) + ๐ต32 sin(๐ฟ3 − ๐ฟ2 )) = 0 ๐ฝ322 = ๐2 (๐1 (๐บ12 cos(๐ฟ2 − ๐ฟ1 ) + ๐ต12 sin(๐ฟ2 − ๐ฟ1 )) + ๐3 (๐บ32 cos(๐ฟ2 − ๐ฟ3 ) + ๐ต32 sin(๐ฟ2 − ๐ฟ3 ))) = 0 ๐ฝ323 = −๐2 ๐3 (๐บ23 cos(๐ฟ2 − ๐ฟ3 ) + ๐ต23 sin(๐ฟ2 − ๐ฟ3 )) = 0 ๐ฝ422 = 2๐2 ๐ต22 + ๐2 (๐1 (๐บ12 sin(๐ฟ2 − ๐ฟ1 ) − ๐ต12 cos(๐ฟ2 − ๐ฟ1 )) + ๐3 (๐บ32 sin(๐ฟ2 − ๐ฟ3 ) − ๐ต32 cos(๐ฟ2 − ๐ฟ3 )))=15 145 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 15 −5 0 ๐ฝ = [−5 7.5 0 ] 0 0 15 For the first iteration, solve −0.1142857 ๐ฅ(1) = ๐ฅ(0) − ๐ฝ−1 (0) ⋅ Δ๐ฆ(0) = [ 0.05714285 ] 0.96666 6.44 Repeating Problem 6.43 with PL 2 = 1.0 p.u. Similar to solution to 6.43. Y-bus is not affected. ๐2 − ๐2 (๐) −1.0 − 0 −1 Δ๐ฆ(0) = [ ๐3 − ๐3 (๐) ] = [ 1.0 − 0 ] = [ 1 ] −0.5 − 0 −0.5 ๐2 − ๐2 (๐) Jacobian is not affected. −0.02857 ๐ฅ(1) = ๐ฅ(0) − ๐ฝ−1 (0) ⋅ Δ๐ฆ(0) = [ 0.11429 ] 0.96667 6.45 After the first three iterations J22 = 104.41, 135.86, 114.91; and with the next iteration it converges to 106.66. 6.46 First, convert all values to per-unit. PG 2 = 80 MW = 0.8 p.u. PL3 = 180 MW = 1.8 p.u. For convergence, ๏ ymax = 0.1 MVA = 1E-4 p.u. Second, find Ybus . ๏ฉ8 − j16 − 4 + j8 − 4 + j8๏น Ybus = ๏ช๏ช− 4 + j8 8 − j16 − 4 + j8๏บ๏บ ๏ช๏ซ− 4 + j8 − 4 + j8 8 − j16 ๏บ๏ป To solve the case, we follow the steps outlined in section 6.6. Iteration 0 Step 1 ๏ฉ๏ค 2 (0)๏น ๏ฉ0๏น ๏ช ๏บ ๏ช๏บ Start with x(0) = ๏ช๏ค 3 (0)๏บ = ๏ช0๏บ ๏ช๏ซV3 (0)๏บ๏ป ๏ช๏ซ1๏บ๏ป 146 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฉP ( x(0))๏น ๏ฉ0๏น P ( x(0)) = ๏ช 2 ๏บ=๏ช ๏บ ๏ซ๏ชP3 ( x(0))๏ป๏บ ๏ซ0๏ป Q ( x(0)) = Q3 ( x(0)) = 0 ๏ฉ P2 − P2 (x(0)) ๏น ๏ฉ 0.8 ๏น ๏ช ๏บ ๏ y(0) = ๏ช P3 − P3 ( x(0)) ๏บ = ๏ช๏ช− 1.8๏บ๏บ ๏ชQ3 − Q3 ( x(0))๏บ ๏ช๏ซ 0 ๏บ๏ป ๏ซ ๏ป Step 2 ๏ฉ16 − 8๏น J1 = ๏ช ๏บ ๏ซ− 8 16๏ป J 3 = ๏4 − 8๏ ๏ฉ− 4๏น J2 = ๏ช ๏บ ๏ซ8๏ป J 4 = ๏16๏ ๏ฉ16 − 8 − 4๏น ๏ช ๏บ J (0) = ๏ช− 8 16 8 ๏บ ๏ช 4 − 8 16๏บ ๏ซ ๏ป Step 3 J (0)๏x(0) = ๏y(0) ๏ฉ16 − 8 − 4๏น ๏ฉ๏ ๏ค 2 (0)๏น ๏ฉ 0.8๏น ๏ช ๏บ ๏ช− 8 16 8๏บ๏บ ๏ช๏ ๏ค 3 (0)๏บ = ๏ช๏ช− 1.8๏บ๏บ ๏ช ๏ช๏ซ 4 − 8 16๏บ๏ป ๏ช๏ซ๏ V3 (0)๏บ๏ป ๏ช๏ซ 0 ๏บ๏ป ๏ฉ− 0.0083333๏น ๏ x(0) = ๏ช๏ช− 0.094167 ๏บ๏บ ๏ช๏ซ− 0.045 ๏บ๏ป Step 4 ๏ฉ− 0.0083333๏น x(1) = x(0) + ๏ x(0) = ๏ช๏ช− 0.094167 ๏บ๏บ ๏ช๏ซ 0.955 ๏บ๏ป Iteration 1 Step 1 ๏ฉ 0.7825๏น P ( x(1)) = ๏ช ๏บ ๏ซ− 1.6861๏ป Q ( x(1)) = 0.0610 ๏ฉ 0.017502๏น ๏ช ๏บ ๏ y(1) = ๏ช− 0.11385 ๏บ ๏ช๏ซ− 0.06104 ๏บ๏ป 147 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Step 2 ๏ฉ15.9057 − 7.93935 −3.29945๏น J (1) = ๏ช๏ช− 7.28439 14.5314 5.8744 ๏บ๏บ ๏ช๏ซ 4.4609 − 8.98235 15.3439 ๏บ๏ป Step 3 ๏ฉ− 0.0038007๏น ๏ x(1) = ๏ช๏ช− 0.0069372๏บ๏บ ๏ช๏ซ− 0.0069342๏บ๏ป Step 4 ๏ฉ− 0.012134๏น x(2) = ๏ช๏ช− 0.1011 ๏บ๏บ ๏ช๏ซ 0.94807 ๏บ๏ป Iteration 2 Step 1 ๏ฉ 0.7999๏น P ( x(2)) = ๏ช ๏บ ๏ซ− 1.7990๏ป Q ( x(2)) = 6.484 E-4 ๏ฉ 1.3602 E-4๏น ๏ช ๏บ ๏ y(2) = ๏ช− 1.0458 E-4๏บ ๏ช๏ซ− 6.484 E-4 ๏บ๏ป Step 2 −7.89148 −3.27336๏น ๏ฉ15.8424 ๏ช J (2) = ๏ช− 7.21758 14.3806 5.68703๏บ๏บ ๏ช๏ซ 4.45117 −8.98958 15.1697 ๏บ๏ป Step 3 ๏ฉ− 3.7748 E-5๏น ๏ x (2) = ๏ช๏ช− 6.412E-5 ๏บ๏บ ๏ช๏ซ− 6.9664 E-5๏บ๏ป Step 4 ๏ฉ− 0.012172๏น x(3) = ๏ช๏ช− 0.10117 ๏บ๏บ ๏ช๏ซ 0.948 ๏บ๏ป 148 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Iteration 3 Step 1 ๏ฉ 0.8000๏น P ( x(3)) = ๏ช ๏บ ๏ซ− 1.8000๏ป Q ( x(3)) = 6.4875 E-8 ๏ฉ 1.1294 E-8 ๏น ๏ y(3) = ๏ช๏ช− 9.7437 E-8๏บ๏บ ๏ช๏ซ− 6.4875 E-8๏บ๏ป ๏ y(3) ๏ผ 1E-4 ๏ Newton-Raphson has converged in 3 iterations to V1 = 1.0 ๏ 0 V2 = 1.0 ๏ − 0.012172 rad = 1.0 ๏ − 0.6974° V3 = 0.948 ๏ − 0.10117 rad = 0.948 ๏ − 5.797° Using the voltages, we can calculate the powers at buses 1 and 2 with Eqs. (6.6.2) and (6.6.3). P1 = 1.0910 p.u. = 109.10 MW Q1 = 0.0237 p.u. = 2.37 Mvar Q2 = 0.1583 p.u. = 15.83 Mvar Using PowerWorld simulator, we get P1 = 109.1 MW Q1 = 2.4 Mvar Q2 = 15.8 Mvar V3 = 0.948 p.u. which agrees with our solution. 6.47 First, convert values to per-unit Q2 = 50 Mvar = 0.5 p.u. Ybus stays the same as in Problem 6.46. Since bus 2 is now a PQ bus, we introduce a fourth equation in order to solve for V2 . Iteration 0 Step 1 ๏ฉ๏ค 2 (0)๏น ๏ฉ0๏น ๏ช ๏ค (0)๏บ ๏ช0๏บ Start with x(0) = ๏ช 3 ๏บ = ๏ช ๏บ ๏ชV2 (0)๏บ ๏ช1๏บ ๏ช ๏บ ๏ช๏บ ๏ซ๏ชV3 (0)๏ป๏บ ๏ซ๏ช1๏ป๏บ 149 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฉP ( x(0))๏น ๏ฉ0๏น P ( x(0)) = ๏ช 2 ๏บ=๏ช ๏บ ๏ช๏ซP3 (x(0))๏บ๏ป ๏ซ0๏ป ๏ฉQ ( x(0))๏น ๏ฉ0๏น Q ( x(0)) = ๏ช 2 ๏บ=๏ช ๏บ ๏ซ๏ชQ3 ( x(0))๏ป๏บ ๏ซ0๏ป ๏ฉ P2 − P2 (x(0)) ๏น ๏ฉ 0.8๏น ๏ช ๏บ P − P ( x(0)) ๏บ ๏ช๏ช− 1.8๏บ๏บ ๏ y(0) = ๏ช 3 3 = ๏ช Q2 − Q2 ( x(0) ๏บ ๏ช 0.5๏บ ๏ช ๏บ ๏ช ๏บ ๏ช๏ซQ3 − Q3 ( x(0))๏บ๏ป ๏ซ๏ช 0๏ป๏บ Step 2 ๏ฉ16 ๏ช −8 J (0) = ๏ช ๏ช− 8 ๏ช ๏ช๏ซ4 −8 8 − 4๏น ๏บ 16 − 4 8 ๏บ 4 16 − 8๏บ ๏บ − 8 − 8 16 ๏บ๏ป Step 3 J (0)๏ x(0) = ๏ y(0) ๏ฉ− 0.023333๏น ๏ช− 0.10167 ๏บ ๏บ ๏ x(0) = ๏ช ๏ช 1.03 ๏บ ๏ช ๏บ ๏ช๏ซ 0.97 ๏บ๏ป Step 4 ๏ฉ− 0.023333๏น ๏ช ๏บ − 0.10167 ๏บ x(1) = x(0) + ๏ x(0) = ๏ช ๏ช 1.03 ๏บ ๏ช ๏บ ๏ซ๏ช 0.97 ๏ป๏บ Iteration 1 Step 1 ๏ฉ 0.8174๏น P ( x(1)) = ๏ช ๏บ ๏ซ− 1.7299๏ป ๏ฉ0.5517๏น Q ( x(1)) = ๏ช ๏บ ๏ซ0.0727๏ป ๏ฉ− 0.01739 ๏น ๏ช ๏บ − 0.070052๏บ ๏ช ๏ y(1) = ๏ช− 0.051746๏บ ๏ช ๏บ ๏ช๏ซ− 0.072698๏บ๏ป 150 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Step 2 9.03358 −3.46256๏น ๏ฉ16.4227 −8.28102 ๏ช ๏บ − 7.65556 14.9817 −4.47535 5.97655๏บ J (1) = ๏ช ๏ช− 7.66981 3.35868 17.0157 −8.53714๏บ ๏ช ๏บ ๏ซ๏ช 4.60961 −9.25715 −7.43258 15.5949 ๏ป๏บ Step 3 ๏ฉ− 0.00057587๏น ๏ช ๏บ − 0.0032484 ๏บ ๏ช ๏ x(1) = ๏ช− 0.0077284 ๏บ ๏ช ๏บ ๏ซ๏ช− 0.010103 ๏ป๏บ Step 4 ๏ฉ− 0.023904๏น ๏ช ๏บ − 0.10492 ๏บ ๏ช x(2) = ๏ช 1.0223 ๏บ ๏ช ๏บ ๏ช๏ซ 0.9599 ๏บ๏ป Iteration 2 Step 1 ๏ฉ 0.7999๏น P ( x(2)) = ๏ช ๏บ ๏ซ− 1.7989๏ป ๏ฉ0.5005๏น Q ( x(2)) = ๏ช ๏บ ๏ซ0.0007๏ป ๏ฉ 0.00013185๏น ๏ช ๏บ − 0.0011097 ๏บ ๏ y(2) = ๏ช ๏ช− 0.00048034๏บ ๏ช ๏บ ๏ซ๏ช− 0.00072284๏ป๏บ Step 2 ๏ฉ 16.2201 − 8.14207 8.96061 −3.41392๏น ๏ช ๏บ − 7.50685 14.7417 − 4.44838 5.80513 ๏บ J (2) = ๏ช ๏ช− 7.56045 3.27701 16.8459 −8.48223๏บ ๏ช ๏บ ๏ซ๏ช 4.54745 − 9.17011 −7.34331 15.3591 ๏ป๏บ Step 3 ๏ฉ − 6.3502 E-7 ๏น ๏ช − 5.3289E-5 ๏บ ๏บ ๏ x(2) = ๏ช ๏ช − 7.6468E-5 ๏บ ๏ช ๏บ ๏ซ๏ช− 0.00011525๏ป๏บ 151 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Step 4 ๏ฉ− 0.02391๏น ๏ช− 0.10497๏บ ๏บ x(3) = ๏ช ๏ช 1.0222 ๏บ ๏ช ๏บ ๏ซ๏ช 0.95978 ๏ป๏บ Iteration 3 Step 1 ๏ฉ 0.8000 ๏น P ( x(3)) = ๏ช ๏บ ๏ซ− 1.8000๏ป ๏ฉ0.5000๏น Q ( x(3)) = ๏ช ๏บ ๏ซ0.0000๏ป ๏ฉ 6.1267 E-8 ๏น ๏ช ๏บ − 2.0161E-7 ๏บ ๏ y(3) = ๏ช ๏ช− 6.5136 E-8๏บ ๏ช ๏บ ๏ช๏ซ − 8.9553E-8 ๏บ๏ป ๏y(3) ๏ผ 1 E-4 ๏ Newton-Raphson has converged in 3 iterations to V1 = 1.0 ๏ 0 V2 = 1.0222 ๏ − 0.02391 rad =1.0222 ๏ − 1.370 ๏ฐ V3 = 0.95978 ๏ − 0.10497 rad = 0.95978 ๏ − 6.014° Using the voltages, we can calculate the powers at bus 1 with Eqs. (6.6.2) and (6.6.3). P1 = 1.0944 p.u. = 109.44 MW Q1 = − 0.3112 p.u. = − 31.12 Mvar Using PowerWorld Simulator, we get P1 = 109.4 MW Q1 = − 31.1 Mvar V2 = 1.025 p.u. V3 = 0.960 p.u. Which agrees with our solution. 152 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 6.48 6.49 Tap setting Mvar @ G1 V5 (p.u.) V2 (p.u.) P losses 0.975 94 0.954 0.806 37.64 0.98125 90 0.961 0.817 36.63 0.9875 98 0.965 0.823 36.00 0.99375 106 0.97 0.828 35.4 1.0 114 0.974 0.834 34.84 1.00625 123 0.979 0.839 34.31 1.0125 131 0.983 0.845 33.81 1.01875 140 0.987 0.850 33.33 1.025 149 0.992 0.855 32.89 1.03125 158 0.996 0.86 32.47 1.0375 167 1.0 0.865 32.08 1.04375 176 1.004 0.87 31.72 1.05 185 1.008 0.874 31.38 1.05625 195 1.012 0.879 31.06 1.0625 204 1.016 0.884 30.76 1.06875 214 1.02 0.888 30.49 1.075 224 1.024 0.893 30.23 1.08125 233 1.028 0.897 30.00 1.0875 243 1.031 0.901 29.79 1.09375 253 1.035 0.906 29.59 1.1 263 1.039 0.910 29.42 153 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 6.50 Shunt Capacitor Shunt Capacitor Shunt Capacitor Line Line Line Total Power State Rating (Mvar) Output (Mvar) 2-4 2-5 4-5 Losses (MW) Disconnected 0 0 0.834 27% 49% 19% 34.37 Connected 200 184.0 0.959 25% 44% 16% 25.37 Connected 261 261.0 1.000 25% 43% 15% 23.95 V2 (p.u.) When the capacitor rating is set at 261 Mvar, the voltage at bus 2 becomes 1.0 per unit. As a result of this, the line loadings decrease on all lines, and thus the power loss decrease as well. 6.51 Before new line After new line Bus voltage V2 (p.u.) 0.834 0.953 Total real power losses (MW) 34.8 18.3 Branch b๏ฏw bus 1–5 (% loading) 68.5 63.1 Branch b๏ฏw bus 2–4 (% loading) 27.3 17.5 49.0 25.4 (both lines) Branch b๏ฏw bus 2–5 (% loading) Branch b๏ฏw bus 3–4 (% loading) 53.1 45.7 Branch b๏ฏw bus 4–5 (% loading) 18.8 22.1 6.52 With the line connecting REDBUD 69 and PEACH 69 removed, the voltage at REDBUD 69 drops to 0.968 p.u. To raise that voltage to 1.0 p.u., we require 26.0 Mvar from the capacitor bank of REDBUD 69. 6.53 When the generation at PEAR138 is 300 MW, the losses on the system are minimized to 10.24 MW. 154 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 6.54 Total System Losses (MW) 16 14 12 10 8 6 4 2 0 0 100 200 300 400 500 P(PEAR138)(MW) When the generation at PEAR138 is 260 MW or 280 MW, the losses on the system are minimized to 11.48 MW. 6.55 DIAG = [17 25 9 2 14 15] OFFDIAG = [−9.1 −2.1 −7.1 −9.1 −8.1 −1.1 −6.1 −8.1 −1.1 −2.1 −6.1 −5.1 −7.1 −5.1] C0L =[ 2 5 6 1 3 4 ROW =[ 3 4 1 1 3 2] 5 2 2 1 2 6 1 5] 6.56 By the process of node elimination and active branch designation, in Fig. 6.9: The fill-in (dashed) branch after Step 6 is shown below: Note that two fill-ins are unavoidable. When the bus numbers are assigned to Fig. 6.9 in accordance with the step numbers above, the rows and columns of YBUS will be optimally ordered 155 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. for Gaussian elimination, and as a result, the triangular factors L and U will require minimum storage and computing time for solving the nodal equations. 6.57 Table 6.6 w๏ฏ DC Approximation Generation Bus # Load Voltage Phase Angle PG QG PL QL Magnitude (degrees) (per unit) (per unit) (per unit) (per unit) (per unit) 1 1.000 0.000 3.600 0.000 0.000 0.000 2 1.000 −18.695 0.000 0.000 8.000 0.000 3 1.000 0.524 5.200 0.000 0.800 0.000 4 1.000 −1.997 0.000 0.000 0.000 0.000 5 1.000 −4.125 0.000 0.000 0.000 0.000 TOTAL 8.800 0.000 8.800 0.000 When comparing these results to Table 6.6 in the book, voltage magnitudes are all constant. Most phase angles are close to the NR algorithm except bus 3 has a positive angle in DC and a negative value in NR. Total generation is less since losses are not taken into account and reactive power is completely ignored in DC power flow. Table 6.7 w๏ฏ DC Approximation Line # 1 2 3 Bus to Bus P Q S 2 4 −2.914 0.000 2.914 4 2 2.914 0.000 2.914 2 5 −5.086 0.000 5.086 5 2 5.086 0.000 5.086 4 5 1.486 0.000 1.486 5 4 −1.486 0.000 1.486 With the DC power flow, all reactive power flows are ignored. Real power flows are close to the NR algorithm except losses are not taken into account, so each end of the line has the same flow. 156 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Table 6.8 w๏ฏ DC Approximation Tran. # 1 2 Bus to Bus P Q S 1 5 3.600 0.000 3.600 5 1 −3.600 0.000 3.600 3 4 4.400 0.000 4.400 4 3 −4.400 0.000 4.400 With DC approximation the reactive power flows in transformers are also ignored and losses are also assumed to be zero. 6.58 With the reactance on the line from bus 2 to bus 5 changed, the B matrix becomes: 0 ๏ฉ− 43.333 ๏ช 0 − 100 B=๏ช ๏ช 10 100 ๏ช 0 ๏ซ๏ช 33.333 10 100 − 150 40 33.333๏น ๏บ 0 ๏บ ๏บ 40 ๏บ − 123.333๏ป๏บ P remains the same: ๏ฉ− 8.0๏น ๏ช ๏บ 4.4 ๏บ ๏ช P= ๏ช 0 ๏บ ๏ช ๏บ ๏ช๏ซ 0 ๏บ๏ป ๏ฉ− 0.2443๏น ๏ฉ−13.995° ๏น ๏ช ๏บ ๏ช ๏บ 0.0255๏บ 1.4638°๏บ ๏ค = − B−1 P = ๏ช rad = ๏ช ๏ช− 0.0185๏บ ๏ช −1.0572°๏บ ๏ช ๏บ ๏ช ๏บ ๏ช๏ซ− 0.0720๏บ๏ป ๏ช๏ซ −4.1253°๏บ๏ป 157 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 6.59 (a) Since bus 7 is the slack bus, we neglect row 7 and column 7 in our B matrix and P vector. 16.667 4.167 0 0 0 ๏ฉ− 20.833 ๏น ๏ช ๏บ 5.556 5.556 8.333 16.667๏บ ๏ช 16.667 − 52.778 ๏ช 4.167 ๏บ 5.556 −43.056 33.333 0 0 B=๏ช ๏บ 5.556 33.333 −43.056 4.167 0 ๏ช 0 ๏บ ๏ช 0 ๏บ 8.333 0 4.167 −29.167 0 ๏ช ๏บ 16.667 0 0 0 −25 ๏ช๏ซ 0 ๏บ๏ป ๏ฉ 160๏น ๏ฉ 1.6๏น ๏ช ๏บ ๏ช ๏บ ๏ช 110๏บ ๏ช 1.1๏บ ๏ช− 110๏บ ๏ช− 1.1๏บ P=๏ช ๏บ MW= ๏ช ๏บ p.u. ๏ช− 30 ๏บ ๏ช− 0.3๏บ ๏ช− 130๏บ ๏ช− 1.3๏บ ๏ช ๏บ ๏ช ๏บ ๏ซ๏ช 0 ๏ป๏บ ๏ซ๏ช 0 ๏ป๏บ (b) ๏ค = −B−1P ๏ฉ 7.6758 ๏ฐ๏น ๏ช ๏บ ๏ช 4.2020 ๏ฐ๏บ ๏ช− 0.4315 ๏ฐ๏บ =๏ช ๏บ ๏ช− 0.3265 ๏ฐ๏บ ๏ช− 1.3999 ๏ฐ๏บ ๏ช ๏บ ๏ซ๏ช 2.8014 ๏ฐ๏ป๏บ This agrees with the angles shown in PowerWorld. 6.60 First, we find the angle of bus 1 required to give a 59 MW line loading to the line between buses 1 and 3. P13 = 0.59 = ๏ค1 − ๏ค 3 x13 ๏ค1 − ๏ค 3 0.24 ๏ค1 = ๏ค 3 + 0.142 Now, we solve for the angles: P = − B๏ค 158 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฉ1.6 + ๏ P1๏น ๏ฉ ๏ช 1.1 ๏บ ๏ช ๏ช ๏บ ๏ช ๏ช − 1.1 ๏บ ๏ช ๏ช ๏บ = −๏ช ๏ช − 0.3 ๏บ ๏ช ๏ช − 1.3 ๏บ ๏ช ๏ช ๏บ ๏ช ๏ช๏ซ 0 ๏บ๏ป ๏ช๏ซ B ๏น ๏ฉ๏ค 3 + 0.142๏น ๏บ ๏บ๏ช ๏ค2 ๏บ ๏บ๏ช ๏บ ๏บ๏ช ๏ค3 ๏บ ๏บ๏ช ๏ค4 ๏บ ๏บ๏ช ๏บ ๏บ๏ช ๏ค5 ๏บ ๏บ๏ช ๏ค6 ๏บ๏ป ๏ช๏ซ ๏บ๏ป This is a system of 6 unknowns (๏ค 2 ,๏ค3 ๏ค6 , ๏P1) and 6 equations. Solving yields ๏ P1 = 0.0115 p.u. =1.15 MW Therefore, if the generator at bus 1 increases output by 1.115 MW, the flow on the line between buses 1 and 3 will reach 100%. 6.61 A type 1 or 2 wind turbine is one which maintains a constant real and reactive power output. Hence, the bus it is connected to will be a PQ bus. A type 3 or 4 wind turbine is one which maintains a constant voltage and real power output; the bus it is connected to will be a PV bus. In a contingency such as a line outage, the voltage in the PQ bus will change due to the redistribution of power flows on the remaining lines. However, the voltage on a PV bus remains constant in a contingency, due to the fact that the type 3 or 4 wind turbine changes its reactive power output to maintain that voltage. In this regard, a type 3 or 4 wind turbine is more favorable. From Eq. (6.6.3), we can see that the reactive power injection at a bus is directly proportional to the voltage magnitude at that bus. 159 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Chapter 7 Power System Economics and Optimization 7.1 dC1 = 15 + 0.1 P1 = ๏ฌ dP1 dC2 = 20 + 0.08 P2 = ๏ฌ dP2 P1 + P2 = 1000 −1๏น ๏ฉ P1 ๏น ๏ฉ −15 ๏น ๏ฉ0.1 0 ๏ช0 0.08 −1๏บ๏บ ๏ช๏ช P2 ๏บ๏บ = ๏ช๏ช −20 ๏บ๏บ ๏ช ๏ช๏ซ1 1 0 ๏บ๏ป ๏ช๏ซ ๏ฌ ๏บ๏ป ๏ช๏ซ1000 ๏บ๏ป P1 = 472.2 MW, P2 = 527.8 MW, ๏ฌ = 62.2 $/MWh Total cost = $41,230/hr 7.2 Since the unlimited solution violates the P2 limit constraint, P2 = 500 MW, which means P1 = 500 MW. The system lambda is determined by the unlimited unit = 15 + 0.1* 500 = $65/MWh. Total cost is $41,300/hr. 7.3 dC1 = 15 + 0.1 P1 = ๏ฌ dP1 dC2 = 0.95 ( 20 + 0.08P2 ) = ๏ฌ dP2 P1 + P2 = 1000 0 −1๏น ๏ฉ P1 ๏น ๏ฉ −15 ๏น ๏ฉ0.1 ๏ช 0 0.076 −1๏บ ๏ช P ๏บ = ๏ช −19 ๏บ ๏ช ๏บ๏ช 2๏บ ๏ช ๏บ ๏ช๏ซ 1 1 0 ๏บ๏ป ๏ช๏ซ ๏ฌ ๏บ๏ป ๏ช๏ซ1000๏บ๏ป P1 = 454.5 MW, P2 = 545.5 MW, ๏ฌ = 60.5 $/MWh Total cost = $41,259/hr 7.4 ๏ฆ ๏ถ dC1 ๏ง 1 ๏ท 15 + 0.1P1 ๏ง ๏ท= = 60.0 dP1 ๏ง 1 − ๏ถPL ๏ท 1 − 4 ๏ด 10−4 P1 − 4 ๏ด 10−4 P2 ๏ง ๏ถP1 ๏ท๏ธ ๏จ ( ) ๏ฆ ๏ถ dC2 ๏ง 1 ๏ท 20 + 0.08P2 ๏ง ๏ท= = 60.0 dP2 ๏ง 1 − ๏ถPL ๏ท 1 − 6 ๏ด 10−4 P2 − 4 ๏ด 10−4 P1 ๏ง ๏ถP2 ๏ท๏ธ ๏จ ( ) 160 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Rearranging the above two equations gives ( 0.1 + 0.024 ) P1 − (0.024)P2 = 45 ( 0.08 + 0.036 ) P2 − (0.024)P1 = 40 Solving gives P1 = 447.6, P2 = 437.4, Plosses = 19.15 MW, Pload = 865.85 MW, Total cost = $34,431/hr 7.5 For N = 2, (7.12.14) becomes: 2 2 2 i =1 j =1 i =1 PL = ๏ฅ ๏ฅ Pi Bij Pj = ๏ฅ Pi ( Bi1 P1 + Bi 2 P2 ) = B P + B12 P1 P2 + B21 P1P2 + B22 P2 2 2 11 1 Assuming B12 = B21 , PL = B11P12 + 2 B12 P1P2 + B22 P2 2 ๏ถPL = 2 ( B11P1 + B12 P2 ) ๏ถP1 ๏ถPL = 2 ( B12 P1 + B22 P2 ) ๏ถP2 Also, from (7.12.15): i =1 2 ๏ถPL = 2 ๏ฅ B1 j Pj = 2 ( B11P1 + B12 P2 ) j =1 ๏ถP1 i=2 2 ๏ถPL = 2 ๏ฅ B2 j Pj = 2 ( B21P1 + B22 P2 ) j =1 ๏ถP2 = 2 ( B12 P1 + B22 P2 ) which checks. 7.6 Choosing Sbase as 100 MVA (3-Phase), ๏ก1 = ( S3๏ฆ base ) 0.01 = 100; ๏ก 2 = 40 2 ๏ข1 = ( S3๏ฆ base ) 2.00 = 200; ๏ข 2 = 260 ๏ง 1 = 100 ; ๏ง 2 = 80 In per unit, 0.25 ๏ฃ PG1 ๏ฃ 1.5;0.3 ๏ฃ PG 2 ๏ฃ 2.0;0.55 ๏ฃ PL ๏ฃ 3.5 ๏ฌ1 = ๏ถ๏ 1 ๏ถ๏ 2 = 200 PG1 + 200; ๏ฌ2 = = 80 PG 2 + 260 ๏ถPG1 ๏ถPG 2 Calculate ๏ฌ1 and ๏ฌ2 for minimum generation conditions (Point 1, in Figure shown below). Since ๏ฌ2 ๏พ ๏ฌ1 , in order to make ๏ฌ ’s equal, load unit 1 first until ๏ฌ1 = 284 which occurs at PG1 = 284 − 200 = 0.42 (Point 2 in Figure) 200 161 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Chapter 4 Transmission Line Parameters 4.1 ๐ ๐๐,20 = 4.2 ๐= (10.37 Ω-cmil/ft)(10 ft) 50+234.5 = 1.659 mΩ; ๐ ๐๐,50 = (1.659 mΩ) ( ) = 1.854 mΩ (250 mil)2 20+234.5 (1 Ω)(500 mil)2 14000 feet ๐ = 17.857 Ω-cmil/ft; ๐2 = ๐2 (๐1 + ๐) − ๐ = 1 17.857 (20 + 228.1) − 228.1 = 17 32.5° C 4.3 l = 1.05 ๏ด 2000 = 2100 m , Allowing for the twist. X-sectional area of all 19 strands = 19 ๏ด R= ๏ฐ 4 ๏ด (1.5 ๏ด 10 −3 ) = 33.576 ๏ด 10 −6 m 2 . 2 Pl 1.72 ๏ด 10−8 ๏ด 2100 = = 1.076๏ ๏ฌ A 33.576 ๏ด 10−6 2 4.4 ๏ฆ ๏ฐ sq ๏ mil ๏ถ ๏ฆ 1in ๏ถ ๏ฆ 0.0254 m ๏ถ (a) 795 MCM = ( 795 ๏ด 103 cmil ) ๏ง 4 ๏ท ๏ง ๏ท ๏ท๏ง ๏จ 1 cmil ๏ธ๏จ 1000 mil ๏ธ ๏จ 1in ๏ธ = 4.0283 ๏ด 10 −4 m 2 2 ๏ฆ 50 + T ๏ถ (b) R60 HZ, 50°C = R60 HZ, 75°C ๏ง ๏ท ๏จ 75 + T ๏ธ ๏ฆ 50+228.1 ๏ถ = 0.0880 ๏ง ๏ท ๏จ 75+228.1 ๏ธ = 0.0807 ๏/km 4.5 Ω mi 1mi Ω ) = 0.07365 per conductor (at 75% current 1.609km km From Table A-4 ๐ 60 ๐ป๐ง,50°๐ถ = (0.1185 ) ( capacity). For 3 conductors per phase: ๐ 60 ๐ป๐ง,50°๐ถ = 4.6 Total transmission line loss PL = I= 0.07365 Ω = 0.02455 km per phase 3 2.5 (190.5) = 4.7625MW 100 190.5 ๏ด 103 = 500 A 3 ( 220 ) From PL = 3I 2 R , the line resistance per phase is R= 4.7625๏ด106 3 ( 500 ) 2 = 6.35 ๏ 63 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. The conductor cross-sectional area is given by A= ( 2.84 ๏ด 10−8 )( 63 ๏ด 103 ) = 2.81764 ๏ด 10−4 m 2 6.35 ๏d = 1.894cm = 0.7456in = 745.6 mil A = d 2 = ( 745.6 ) = 556,000 cmil 2 4.7 12 W 50+234.5 = 37.0 mΩ. ๐ = 10.37 ( ) = 11.59 Ω-cmil/ft; A)2 20+234.5 ๐ = (18 (11.59)(4000) diameter = √ 4.8 (a) 0.037 = 1119 mil = 1.119 in From Eq. (4.4.10) H ๏ถ๏ฆ 1000 m ๏ถ๏ฆ 1000 m H ๏ถ ๏ฆ1 Lint = ๏ง ๏ด 10 −7 ๏ท๏ง ๏ท๏ง ๏ท = 0.05mH/ km Per Conductor 2 m ๏จ ๏ธ๏จ 1km ๏ธ๏จ 1H ๏ธ (b) From Eq. (4.5.2) ๏ฆD๏ถH Lx = Ly = 2 ๏ด 10 −7 Ln ๏ง ๏ท ๏จ ๏๏ข ๏ธ m −1 ๏ฆ 0.015 ๏ถ −3 D = 0.5m ๏๏ข = e 4 ๏ง ๏ท = 5.841 ๏ด 10 m 2 ๏จ ๏ธ 0.5 ๏ฆ ๏ถ H ๏ฆ 1000 m ๏ถ๏ฆ 1000 mH ๏ถ Lx = Ly = 2 ๏ด 10 −7 Ln ๏ง ๏ง ๏ท๏ง ๏ท −3 ๏ท H ๏จ 5.841 ๏ด 10 ๏ธ m ๏จ km ๏ธ๏จ ๏ธ = 0.8899 mH per conductor km (c) L = L x + L y = 1.780 4.9 mH per circuit km (a) Lint = 0.05mH/ km Per Conductor 0.5 ๏ฆ ๏ถ 6 Lx = Ly = 2 ๏ด 10 −7 ln ๏ง 10 = 0.8535mH/ km Per Conductor −3 ๏ท ๏จ 1.2 ๏ด 5.841 ๏ด 10 ๏ธ L = L x + L y = 1.707mH / km Per Circuit (b) ๏ฌ12( Ic ) = 0.2 I c ln Dc 2 mWb/km Dc1 0.5 ๏ฆ ๏ถ 6 Lx = Ly = 2 ๏ด 10 −7 ln ๏ง 10 = 0.9346 mH/km Per Conductor −3 ๏ท 0.8 ๏ด 5.841 ๏ด 10 ๏จ ๏ธ L = L x + L y = 1.869mH/km Per Circuit. Lint is independent of conductor diameter. 64 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. The total inductance decreases 4.1% (increases 5%) at the conductor diameter increases 20 % (decreases 20%). 4.10 From Eq. (4.5.10) ๏ฆD๏ถH L1 = 2 ๏ด 10 −7 Ln ๏ง ๏ท ๏จ r๏ข ๏ธ m D = 4 ft −1 ๏ฆ .5 ๏ถ ๏ฆ 1ft ๏ถ r๏ข = e 4 ๏ง ๏ท ๏ง ๏ท ๏จ 2 ๏ธ ๏จ 12 in ๏ธ 4 ๏ฆ ๏ถ L1 = 2 ๏ด 10 −7 Ln ๏ง −2 ๏ท 1.6225 ๏ด 10 ๏จ ๏ธ H m L1 = 1.101 ๏ด 10 −6 r ๏ข = 1.6225 ๏ด 10 −2 ft X1 = ๏ท L1 = ( 2๏ฐ 60 ) (1.101๏ด 10−6 ) (1000 ) = 0.4153 ๏ / km 4.8 ๏ฆ ๏ถ 4.11 (a) L1 = 2 ๏ด 10 −7 ln ๏ง = 1.138 ๏ด 10 −6 H/m −2 ๏ท ๏จ 1.6225 ๏ด 10 ๏ธ X1 = ๏ท L1 = 2๏ฐ ( 60 ) (1.138 ๏ด 10−6 ) (1000 ) = 0.4292 ๏ /km 3.2 ๏ฆ ๏ถ (b) L1 = 2 ๏ด 10 −7 ln ๏ง = 1.057 ๏ด 10 −6 H/m −2 ๏ท 1.6225 ๏ด 10 ๏จ ๏ธ X1 = 2๏ฐ ( 60 ) (1.057 ๏ด 10−6 ) (1000 ) = 0.3986 ๏ / km L1 and X1 increase by 3.35% (decrease by 4.02%) as the phase spacing increases by 20% (decreases by 20%). 4.12 For this conductor, Table A.4 lists GMR to be 0.0217 ft. For one conductor, ๐ฟ๐ฅ = 2 × 10−7 ln 25 =1.409μH/m; The inductive reactance is 2๐(60)(๐ฟ๐ฅ )Ω/m = 0.0217 0.531 Ω/km = 0.855 Ω/mi. For the single-phase line, with two conductors, 2 × 0.855 = 1.710 Ω/mi. 4.13 (a) The total line inductance is given by D๏น ๏ฉ LT = ๏ช 4 ๏ด 10−4 ln ๏บ mH/ m r๏ข ๏ป ๏ซ 3.5 = 4 ๏ด 10−4 ln = 0.002 mH/ m ( 0.7788 )( 0.03) (b) The total line reactance is given by XT = 2๏ฐ ( 60 ) 4 ๏ด 10 −4 ln = 0.1508 ln or 0.2426 ln D r๏ข D ๏ / km r๏ข D ๏ / mi r๏ข 65 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ X T = 0.755 ๏ / km or 1.215 ๏ / mi (c) LT = 4 ๏ด 10−4 ln 7 = 0.00228 mH/ m 0.7788 ( 0.03) Doubling the separation between the conductors causes only about a 14% rise in inductance. 4.14 (a) Eq. (4.5.9): L = 2 ๏ด 10 −7 ln D H/m Per Phase r๏ข X = ๏ท L = 4๏ฐ f ๏ด 10 −7 ln ( D / r ๏ข ) ๏ / m/ Phase = f .๏๏ฐ ๏ด 10 −7 (1609.34 ) ln ( D / r ๏ข ) ๏ / MILE /PH. = f .4๏ฐ (1609.34 )( 2.3026 )10 −7 log ( D / r ๏ข ) ๏ /mi /ph. = 4.657 ๏ด 10 −3 f log ( D / r ๏ข ) ๏ /mi/ph. = 0.2794 log ( D / r ๏ข ) ๏ / mi / ph. at f = 60 HZ . ๏ฆD๏ถ ๏ฆ1๏ถ ๏ X = k log ๏ง ๏ท = k log D + k log ๏ง ๏ท , Where k = 4.657 ๏ด 10 −3 f ๏ข r ๏จ ๏ธ ๏จ r๏ข ๏ธ ๏ฌ (b) r ๏ข = r.e −1/ 4 = 0.06677 ( 0.7788 ) = 0.052 ft. X a = k log 1 ๏ฆ 1 ๏ถ = 0.2794 log ๏ง ๏ท = 0.35875 r๏ข ๏จ 0.052 ๏ธ X d = k log D = 0.2794 log (10 ) = 0.2794 X = X a + X d = 0.63815 ๏ / mi/ ph. ๏ฌ When spacing is doubled, X d = 0.36351 and X = 0.72226 ๏ / mi/ph. ๏ฌ 66 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 4.15 For each of six outer conductors: − 1 D11 = r ๏ข = e 7 r D12 = D16 = D17 = 2r D13 = D15 = 2 3r D14 = 4r For the inner conductor: − 1 D77 = ๏1 = e 4 r D71 = D72 = D73 = D74 = D75 = D76 = 2r ๏ฉ ๏น ๏ฉ ๏น 2 1 ๏ช๏ฆ − 1 ๏ถ ๏บ ๏ช ๏บ ๏ญ − ๏ฆ ๏ถ 3 6 ๏ช๏ง e 4 r ๏ท ( 2r ) 2 3r ( 4r ) ๏บ ๏ช ๏ง e 4 r ๏ท ( 2r ) ๏บ Ds = GMR = 49 ๏ช๏จ 6 ๏บ ๏ช ๏จ ๏บ ๏ธ ๏ธ ๏ซ๏ช Distances for each Outer conducter ๏ป๏บ Six outer conductors ๏ซ๏ช Distances for inner conductor ๏ป๏บ ( ) 6 ( ) 7 ( ) 1 12 ๏ฆ −1 ๏ถ 18 6๏ฆ − ๏ถ 6 Ds = GMR = r ๏ง e 4 ๏ท ( 2 ) 2 3 ( 4 ) ๏ง e 4 ๏ท ( 2 ) ๏จ ๏ธ ๏จ ๏ธ 49 12 ๏ฆ −1 ๏ถ 24 6 Ds = GMR = r ๏ง e 4 ๏ท ( 2 ) 2 3 ( 4 ) = 2.177 r ๏จ ๏ธ 49 4.16 2 ( DSL = N b D11 D12 ๏๏๏ D1N b ) = ( D D ๏๏๏ D ) Nb 11 12 1N b 1 Nb ๏ฉ ( n -1) ๏ฐ ๏น D11 = DS D1n = 2 A sin ๏ช ๏บ n = 2,3, ๏๏๏ N b ๏ซ Nb ๏ป 1 ๏ฌ๏ฏ ๏ฉ ๏ฆ ๏ฐ ๏ถ๏น ๏ฉ ๏ฆ 2๏ฐ ๏ถ ๏น ๏ฉ ๏ฆ 3๏ฐ ๏ถ ๏น ๏ฉ ๏ฆ N b − 1 ๏ถ ๏น ๏ผ๏ฏ Nb DSL = ๏ญ DS ๏ช2 A sin ๏ง 2 A sin 2 A sin ๏๏๏ 2 A sin ๏ท๏บ ๏ช ๏ง ๏ท๏บ ๏ช ๏ง ๏ท๏บ ๏ช ๏ง ๏ท๏ฐ ๏บ ๏ฝ ๏จ N b ๏ธ ๏บ๏ป ๏ช๏ซ ๏จ N b ๏ธ ๏บ๏ป ๏ช๏ซ ๏จ N b ๏ธ ๏บ๏ป ๏ช๏ซ ๏จ N b ๏ธ ๏บ๏ป ๏ฏ๏พ ๏ฏ๏ฎ ๏ช๏ซ Using the trigonometric identity, ๏ป ( N −1) DSL = DS ( A ) b ๏ฝ 1 N b Nb which is the desired result. 67 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Two-conductor bundle, Nb = 2 d A= 2 ๏ฉ ๏ฆd๏ถ ๏น DSL = ๏ช DS ๏ง ๏ท ( 2 ) ๏บ ๏ซ ๏จ2๏ธ ๏ป 1/ 2 = DS d Eq (4.6.19) Three-conductor bundle, Nb = 3 A= ๏ฉ ๏ฆ d ๏ถ2 ๏น DSL = ๏ช DS ๏ง ๏ท 3๏บ ๏ช๏ซ ๏จ 3 ๏ธ ๏บ๏ป d 3 1/ 3 3 = √๐ท๐ ๐2Eq (4.6.20) Four-conductor bundle, Nb = 4 ๏ฉ ๏ฆ d ๏ถ3 ๏น A= DSL = ๏ช DS ๏ง ๏ท 4๏บ 2 ๏ช๏ซ ๏จ 2 ๏ธ ๏บ๏ป d 1/ 4 ๏ฆ 4 ๏ถ = 4 DS d 3 4 ๏ง ๏ท ๏จ2 2 ๏ธ = 1.0905 4 DS d 3 Eq (4.6.21) 3 1 ๏ฉ๏ฆ − 1 ๏ถ ๏น 3 − 4.17 (a) GMR = 9 ๏ช๏ง e 4 r ๏ท ( 2r )( 2r ) ๏บ = r 4e 4 ๏ธ ๏ซ๏จ ๏ป = 1.4605 r 2 ๏ฉ ๏น ๏ฉ ๏น ๏ช๏ฆ − 1 ๏ถ ๏บ ๏ช๏ฆ − 1 ๏ถ ๏บ (b) GMR = 16 ๏ช๏ง e 4 r ๏ท ( 2r )( 4r )( 6r ) ๏บ ๏ช๏ง e 4 r ๏ท ( 2r )( 2r )( 4r ) ๏บ ๏ช๏จ ๏บ ๏ช๏จ ๏บ ๏ธ ๏ธ ๏ช๏ซ Distancesfor each outer conductor ๏บ๏ป ๏ช๏ซ Distancesfor each inner conductor ๏บ๏ป 2 4 ๏ฆ −1 ๏ถ 6 4 2 GMR = 16 ๏ง e 4 ๏ท ( 2 ) ( 4 ) ( 6 ) ( r ) = 2.1554r ๏จ ๏ธ 68 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฉ ๏ช๏ฆ − ๏ถ (c) GMR = r ๏ช๏ง e ๏ท ( 2 ) ( 4 ) ๏ช๏จ ๏ธ ๏ซ๏ช 4 1 81 2 4 2 ๏น ๏ฉ ๏บ ๏ช๏ฆ − ๏ถ 32 ๏บ ๏ด ๏ช๏ง e ๏ท ( 2 ) ๏ธ ๏บ ๏ช๏จ ๏ป๏บ ๏ซ๏ช ( 20 ) ( 8 )( ) 2 Distances for each corner conductor 1 4 3 ( 8) ( 2 ๏น ๏บ 20 ( 4 ) ๏บ ๏บ ๏ป๏บ ) 4 2 Distances for each outside non-corner conductor ๏ฉ ๏ช๏ฆ − ๏ถ ๏ด ๏ช๏ง e ๏ท ( 2 ) ๏ช๏จ ๏ธ ๏ช๏ซ 1 4 4 ๏น ๏บ 8 ๏บ ๏บ ๏บ๏ป ( ) 4 Distances for the center conductor 9 ๏ฆ −1 ๏ถ 24 GMR = r 81 ๏ง e 4 ๏ท ( 2 ) ๏จ ๏ธ ( 8 ) ( 20 ) ( 4 ) ( 32 ) 16 16 12 4 GMR = 2.6374 r 4.18 ๐ = 0.1128 Ω 3 ; ๐ ๐๐ = √7.5 ⋅ 7.5 ⋅ 15 = 9.45 m; mi 1m From Table A.4, ๐ท๐ = (0.043 ft) 3.28ft = 0.0123 m; ๐ท๐๐ 9.45 ๐ฟ๐ = 2 × 10−7 ln ( ๐ท ) = 2 × 10−7 ln (0.0123) = 1.3239 μH/m; ๐ ๐ = ๐ + ๐๐๐ฟ = 0.1128 ( = 0.0701 + ๐0.499 1 1.609 km mi ) + ๐(2)(๐)(60)(1.3239 × 10−6 )(1000 m/km) Ω km ๐ท๐๐ 3 10.39 4.19 (a) ๐ ๐๐ = √8.25 ⋅ 8.25 ⋅ 16.5 = 10.39 m; ๐ฟ๐ = 2 × 10−7 ln ( ๐ท ) = 2 × 10−7 ln (0.0123) = ๐ 1.3478 μH/m; ๐ = ๐ + ๐๐๐ฟ = 0.1128 ( 1 1.609 km mi ) + ๐(2)(๐)(60)(1.3478 × Ω 10−6 )(1000 m/km) = 0.0701 + ๐0.508 km ๐ท 3 8.50 )= 0.0123 (b) ๐ ๐๐ = √6.75 ⋅ 6.75 ⋅ 13.5 = 8.50 m; ๐ฟ๐ = 2 × 10−7 ln ( ๐๐ ) = 2 × 10−7 ln ( ๐ท๐ 1.3076 μH/m; ๐ = ๐ + ๐๐๐ฟ = 0.1128 ( 1 1.609 km mi ) + ๐(2)(๐)(60)(1.3076 × Ω 10−6 )(1000 m/km) = 0.0701 + ๐0.493 km 69 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (c) ๐ = 0.1185 Ω 1m ; From Table A.4, ๐ท๐ = (0.0391 ft) = 0.0119 m; ๐ฟ๐ = 2 × mi 3.28ft ๐ท 9.45 10−7 ln ( ๐ท๐๐ ) = 2 × 10−7 ln (0.0119) = 1.3354 μH/m; ๐ = ๐ + ๐๐๐ฟ = 0.1185 ( ๐ 1 1.609 km mi )+ Ω ๐(2)(๐)(60)(1.3354 × 10−6 )(1000 m/km) = 0.0736 + ๐0.503 km (d) ๐ = 0.1035 Ω 1m ; From Table A.4, ๐ท๐ = (0.0420 ft) = 0.00128 m; ๐ฟ๐ = mi 3.28ft ๐ท 9.45 2 × 10−7 ln ( ๐ท๐๐ ) = 2 × 10−7 ln (0.00128) = 1.3208 μH/m; ๐ = ๐ + ๐๐๐ฟ = ๐ 0.1035 ( 1 1.609 Ω km mi ) + ๐(2)(๐)(60)(1.3208 × 10−6 )(1000 m/km) = 0.0643 + ๐0.498 km 3 4.20 ๐ท๐๐ = √12 × 12 × 24 = 15.12 m 1m From table A.4, ๐ท๐ = (0.0435 ft) (3.28ft) = 0.0133m DSL = [Dsd2](1/3) = [(0.0133)(0.5)2] (1/3) = 0.1493m 15.12 ๐1 = ๐๐ฟ1 = 2๐(60)2 × 10−7 ln (0.1493) = 0.348 Ω/km 4.21 (a) From Table A.4: ๏ฆ 1 ๏ถ DS = ( 0.0479 ) ๏ง ๏ท = 0.0146 m ๏จ 3.28 ๏ธ DSL = 3 ( 0.0146 )( 0.5 ) = 0.154 m 2 ๏ฉ ๏ ๏ฆ 15.12 ๏ถ ๏น X 1 = ( 2๏ฐ 60 ) ๏ช 2 ๏ด 10−7 Ln ๏ง ๏ท ๏บ ๏ด 1000 = 0.346 km ๏จ 0.154 ๏ธ ๏ป ๏ซ ๏ฆ 1 ๏ถ (b) DS = ( 0.0391) ๏ง ๏ท = 0.0119m ๏จ 3.28 ๏ธ DSL = 3 ( 0.0119 )(.5 )(.5 ) = 0.144 m ๏ฉ ๏ ๏ฆ 15.12 ๏ถ ๏น X 1 = ( 2๏ฐ 60 ) ๏ช 2 ๏ด 10−7 Ln ๏ง ๏ท ๏บ ๏ด 1000 = 0.351 km ๏จ 0.144 ๏ธ ๏ป ๏ซ Results ACSR Conductor Aluminum Cross Section X1 kcmil ๏๏ฏkm Canary 900 0.352 Finch 1113 0.348 Martin 1351 0.346 % change 0.9% 0.6% 70 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 4.22 Application of Eq. (4.6.6) yields the geometric mean distance that separates the two bundles: DAB = 9 ( 6.1) ( 6.2 ) ( 6.3) 6 ( 6.05)( 6.15)( 6.25) = 6.15m 2 2 The geometric mean radius of the equilateral arrangement of line A is calculated using Eq. (4.6.7): RA = 9 ( 0.015576 ) ( 0.1) = 0.0538m 3 6 In which the first term beneath the radical is obtained from r ๏ข = 0.7788 r = 0.7788 ( 0.02 ) = 0.015576 m The geometric mean radius of the line B is calculated below as per its configuration: RB = 9 ( 0.015576 ) ( 0.1) ( 0.2 ) = 0.0628m 3 4 2 The actual configuration can now be replaced by the two equivalent hollow conductors each with its own geometric mean radius and separated by the geometric mean distance as shown below: 4.23 (a) The geometric mean radius of each phase is calculated as R = 4 ( r ๏ข ) ( 0.3) where r ๏ข = 0.7788 ๏ด 0.0074 2 2 = 0.0416m The geometric mean distance between the conductors of phases A and B is given by DAB = 4 62 ( 6.3)( 5.7 ) = 5.996 − 6m Similarly, DBC = 4 62 ( 6.3)( 5.7 ) = 5.996 − 6m and DCA = 4 122 (12.3)(11.7 ) = 11.998 −12m The GMD between phases is given by the cube root of the product of the three-phase spacings. Deq = 3 6 ๏ด 6 ๏ด 12 = 7.56m The inductance per phase is found as L = 0.2 ln or 7.56 = 1.041mH/km 0.0416 L = 1.609 ๏ด 1.041 = 1.674 mH/mi (b) The line reactance for each phase then becomes X = 2๏ฐ f L = 2๏ฐ ( 60 )1.674 ๏ด 10 −3 = 0.631๏ / mi per phase 71 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 4.24 From the ACSR Table A.4 of the text, conductor GMR = 0.0244 ft. Conductor diameter = 0.721 in.; since ( 40 ) + (16 ) = 43.08, 2 2 GMD between phases = ๏ฉ๏ซ( 43.08 )( 80 )( 43.08 ) ๏น๏ป 1/ 3 (a) ๏ X = k log = 52.95 in. D ๏ฆ 52.95 /12 ๏ถ = 0.2794 log ๏ง ๏ท = 0.6307 ๏ /mi ๏ฌ r๏ข ๏จ 0.0244 ๏ธ ๏ฆ 52.95 /12 ๏ถ −7 (b) L = 2 ๏ด 10 −7 ln ๏ง ๏ท = 10.395 ๏ด 10 H/m ๏จ 0.0244 ๏ธ X = ๏ท L = 2๏ฐ ( 60 )10.395 ๏ด 10 −7 ๏ / m = 2๏ฐ ( 60 )10.395 ๏ด 10 −7 (1609.34 ) ๏ mi = 0.6307๏ /mi ๏ฌ 4.25 Resistance per phase = 0.12 = 0.03๏ / mi 4 GMD = ๏ฉ๏ซ( 41.76 )( 80 )( 41.76 ) ๏น๏ป 1/ 3 , using 402 + 122 = 41.76. = 51.78ft. 3 GMR for the bundle :1.091 ๏ฉ( 0.0403 )(1.667 ) ๏น ๏ซ ๏ป 1/ 4 by Eq. (4.6.21) [Note: from Table A.4, conductor diameter. = 1.196 in.; r = 1.196 1 ๏ด = 0.0498ft.] and conductor 2 12 GMR = 0.0403 ft. GMR for the 4-conductor bundle = 0.7171 ft ๏ฆ 51.87 ๏ถ ๏ X = 0.2794 log ๏ง ๏ท = 0.5195 ๏ / mi ๏ฌ ๏จ 0.7171 ๏ธ Rated current carrying capacity for each conductor in the bundle, as per Table A.4, is 1010 A; since it is a 4-conductor bundle, rated current carrying capacity of the overhead line is 1010 ๏ด 4 = 4040A ๏ฌ 4.26 Bundle radius A is calculated by 0.4572 = 2 A sin(๏ฐ / 8) or A = 0.5974 m GMD = 17m ๏ฆ 4.572 ๏ถ Subconductor’s GMR is r ๏ข = 0.7788 ๏ง ๏ด 10 −2 ๏ท = 1.7803 ๏ด 10 −2 m ๏จ 2 ๏ธ ๏ฌ ๏ผ GMD 20 ๏ฏ ๏ฏ −7 L = 2 ๏ด 10 ln = 2 ๏ด 10 ln ๏ญ ๏ฝ 1/8 N -1 1/ N 7 [ Nr๏ข( A) ] ๏ฏ ๏ฉ8 (1.7803 ๏ด 10−2 ) ( 0.5974 ) ๏น ๏ฏ ๏ป ๏พ ๏ฎ๏ซ −7 72 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. which yields L = 7.38 ๏ด 10−7 H / m ๏ฌ 4.27 (a) DABeq = [30 ๏ด 30 ๏ด 60 ๏ด 120]1/ 4 = 50.45ft DBCeq = [30 ๏ด 30 ๏ด 60 ๏ด 120]1/ 4 = 50.45ft DACeq = [60 ๏ด 60 ๏ด 150 ๏ด 30]1/ 4 = 63.44 ft ๏ GMD = (50.45 ๏ด 50.45 ๏ด 63.44)1/ 3 = 54.46 ft Equivalent GMR = ๏ฉ๏ซ(0.0588)3 (90)3 ๏น๏ป 1/ 6 = 2.3ft ๏ฆ 54.46 ๏ถ −6 ๏ L = 2 ๏ด 10 −7 ln ๏ง ๏ท = 0.633 ๏ด 10 H/m ๏ฌ ๏จ 2.3 ๏ธ (b) Inductance of one circuit is calculated below: Deq = [30 ๏ด 30 ๏ด 60]1/ 3 = 37.8ft; r ๏ข = 0.0588ft ๏ฆ 37.8 ๏ถ −6 ๏ L = 2 ๏ด 10 −7 ln ๏ง ๏ท = 1.293 ๏ด 10 H/m ๏จ 0.0588 ๏ธ Inductance of the double circuit = 1.293 ๏ด 10 −6 = 0.646 ๏ด 10 −6 H/m ๏ฌ 2 ๏ฆ 0.633 − 0.646 ๏ถ Error percent = ๏ง ๏ท ๏ด 100 = −2.05% ๏ฌ 0.633 ๏จ ๏ธ 4.28 With N = 3, S = 21๏ข๏ข , A = S 21/12 = = 1.0104 ft 2sin 60๏ฐ 2 ๏ด 0.866 Conductor GMR = 0.0485ft 2 Bundle GMR = ๏ฉ3 ( 0.0485 )(1.0104 ) ๏น ๏ซ ๏ป Then rA๏ข = ๏ฉ๏ซ( GMRb )( DAA๏ข ) ๏น๏ป rB๏ข = ( GMRb ๏ DBB๏ข ) 1/ 2 rC๏ข = ( GMRb ๏ DCC ๏ข ) 1/ 2 1/ 3 = 0.5296 ft ( 1/ 2 = 0.5296 ๏ด 322 + 362 = ( 0.5296 ๏ด 96 ) 1/ 2 1/ 3 1/ 2 = 7.13ft = ๏ฉ0.5296 ๏ด 322 + 362 ๏น ๏ซ ๏ป Overall Phase GMR = ( rA๏ขrB๏ขrC๏ข ) ) = 5.05ft 1/ 2 = 5.05ft = 5.67ft DABeq = ๏ฉ 32 2 + 36 2 ๏ 64 2 + 36 2 ๏ ( 64 )( 32 ) ๏น ๏ซ ๏ป DBCeq = ๏ฉ( 32 ) 64 2 + 36 2 ๏ 64 ๏ 32 2 + 36 2 ๏น ๏ซ ๏ป DACeq = ๏ฉ๏ซ( 36 )( 32 )( 36 )( 32 ) ๏น๏ป 1/ 4 1/ 4 1/ 4 = 51.88ft = 51.88ft = 33.94 ft ๏ GMD = ๏ 51.88 ๏ด 51.88 ๏ด 33.94 ๏ 1/ 3 = 45.04 ft ๏ฆ 45.04 ๏ถ Then X L = 0.2794 log ๏ง ๏ท = 0.2515 ๏ /mi/phase ๏ฌ ๏จ 5.67 ๏ธ 73 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 4.29 rA๏ข = ๏ฉ๏ซ0.5296 ( 32 ) ๏น๏ป rB๏ข = ๏ฉ๏ซ0.5296 ( 32 ) ๏น๏ป 1/ 2 = 4.117ft 1/ 2 = 4.117ft rC๏ข = ๏ฉ๏ซ0.5296 ( 32 ) ๏น๏ป 1/ 2 = 4.117ft Then GMR phase = 4.117ft ๏ป ๏ฝ 1/ 4 2 2 DABeq = ๏ฉ ( 36 ) + ( 32 ) 36 ๏ 642 + 362 ๏น ๏ซ ๏ป DBCeq = ๏ฉ๏ซ( 64 )( 96 )( 32 )( 64 ) ๏น๏ป 1/ 4 ๏ป DACeq = ๏ฉ ( 32 ) + ( 36 ) ๏ซ 2 2 = 49.76ft = 59.56ft ๏ฝ 36 + 64 ๏ (36)๏น๏ป = 49.76ft 1/ 4 2 2 Then GMD = ( 49.76 ๏ด 59.56 ๏ด 49.76 ) 1/ 3 = 52.83ft ๏ฆ 52.83 ๏ถ X L = 0.2794 log ๏ง ๏ท = 0.3097 ๏ /mi/phase ๏ฌ ๏จ 4.117 ๏ธ 4.30 rA๏ข = ๏ฉ๏ซ0.5296 ( 96 ) ๏น๏ป rB๏ข = ๏ฉ๏ซ0.5296 ( 32 ) ๏น๏ป 1/ 2 = 7.13ft 1/ 2 = 4.117ft = rC๏ข From which GMRphase = ( 7.13 ๏ด 4.117 ๏ด 4.117 ) 1/ 3 DABeq = ( 32 ๏ด 64 ๏ด 32 ๏ด 64 ) 1/ 4 ๏ป = 4.95ft = 45.25ft ๏ฝ 2 2 DBCeq = ๏ฉ๏ช( 36 ) ( 32 ) + ( 36 ) ( 36 ) ๏น๏บ ๏ซ ๏ป DACeq = ๏ฉ๏ซ( 322 + 362 ) (642 + 362 ) ๏น๏ป 1/ 4 1/4 = 41.64 ft = 59.47ft Then GMD = ( 45.25 ๏ด 41.64 ๏ด 59.47 ) 1/ 3 = 48.21ft ๏ฆ 48.21 ๏ถ X L = 0.2794 log ๏ง ๏ท = 0.2762 ๏ /mi/ph. ๏ฌ ๏จ 4.95 ๏ธ 4.31 Flux linkage between conductors 1 & 2 due to current, Ia, is ๏ฌ12( I ) = 0.2 I a ln a Da 2 mWb/km Da1 Db1 = Db 2 , ๏ฌ12 due to I b is zero. ๏ฌ12( I ) = 0.2 I c ln c Dc 2 mWb/km Dc1 Total flux linkages between conductors 1 & 2 due to all currents is 74 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฌ12 = 0.2 I a ln Da 2 D + 0.2 I c ln c 2 mWb/km Da1 Dc1 For positive sequence, with I a as reference, I c = I a ๏ − 240๏ฐ ๏ฆ D D ๏ถ ๏ ๏ฌ12 = 0.2 I a ๏ง ln a 2 + (1๏ − 240๏ฐ ) ln c 2 ๏ท Dc1 ๏ธ ๏จ Da1 = 0.2 ( 250 ) ๏ฉ๏ซ ln ( 7.21/ 6.4 ) + (1๏ − 240๏ฐ ) ln ( 6.4 / 7.21) ๏น๏ป = 10.31๏ − 30๏ฐ mWb/km ๏ฉ Note: Da1 = Dc 2 = 42 + 52 = 6.4 m ๏น ๏ช ๏บ 2 2 1/ 2 ๏ช ๏บ ๏ฉ ๏น D = D = 5.2 + 5 = 7.21m a2 c1 ๏ช๏ซ ๏ซ( ) ( ) ๏ป ๏ป๏บ with I a as reference, instantaneous flux linkage is ๏ฌ12 ( t ) = 2 ๏ฌ12 cos(๏ทt + ๏ก ) ๏ Induced voltage in the telephone line per km is VRMS = ๏ท๏ฌ12 ๏๏ก + 90๏ฐ = j๏ท๏ฌ12 = j ( 2๏ฐ ๏ด 60 )(10.31๏ − 30๏ฐ )10 −3 = 3.89๏60๏ฐ V ๏ฌ 4.32 Cn = 2๏ฐ ( 8.854 ๏ด 10 −12 ) 2๏ฐ๏ฅ 0 F = = 1.3246 ๏ด 10 −11 to neutral m ๏ฆD๏ถ ๏ฆ 0.5 ๏ถ Ln ๏ง ๏ท Ln ๏ง ๏ท ๏จ๏๏ธ ๏จ 0.015 / 2 ๏ธ Yn = j๏ทCn = j ( 2๏ฐ 60 ) (1.3246 ๏ด 10 −11 ) Yn = j 4.994 ๏ด 10 −6 4.33 (a) Cn = S m ๏ด 1000 m km S to neutral km 2๏ฐ ( 8.854 ๏ด 10−12 ) = 1.385 ๏ด 10−11 F/ m to neutral ๏ฆ 0.5 ๏ถ ln ๏ง ๏ท ๏จ 0.018 / 2 ๏ธ Yn = j 2๏ฐ ( 60 )1.385 ๏ด 10 −11 (1000 ) = j 5.221 ๏ด 10 −6 S/km to neutral (b) Cn = 2๏ฐ ( 8.854 ๏ด 10 −12 ) ๏ฆ 0.5 ๏ถ ln ๏ง ๏ท ๏จ 0.012 / 2 ๏ธ = 1.258 ๏ด 10 −11 F/m to neutral Yn = j 2๏ฐ ( 60 )1.258 ๏ด 10 −11 (1000 ) = j 4.742 ๏ด 10 −6 S/km to neutral Both the capacitance and admittance-to-neutral increase 4.5% (decrease 5.1%) as the conductor diameter increases 20% (decreases 20%). 75 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 4.34 2๏ฐ ( 8.854 ๏ด 10 −12 ) 2๏ฐ๏ฅ 0 F C1 = = = 1.058 ๏ด 10 −11 4 m ๏ฆD๏ถ ๏ฆ ๏ถ Ln ๏ง ๏ท Ln ๏ง ๏ท ๏ 0.25 /12 ๏จ ๏ธ ๏จ ๏ธ Y1 = j๏ทC1 = j ( 2๏ฐ 60 ) (1.058 ๏ด 10 −11 ) (1000 ) = j 3.989 ๏ด 10 −6 4.35 (a) C1 = S km 2๏ฐ ( 8.854 ๏ด 10 −12 ) ๏ฆ 4.8 ๏ถ ln ๏ง ๏ท ๏จ 0.25 /12 ๏ธ = 1.023 ๏ด 10 −11 F/m Y1 = j 2๏ฐ ( 60 )1.023 ๏ด 10 −11 (1000 ) = j3.857 ๏ด 10 −6 S/km (b) C1 = 2๏ฐ ( 8.854 ๏ด 10 −12 ) ๏ฆ 3.2 ๏ถ ln ๏ง ๏ท ๏จ 0.25 /12 ๏ธ = 1.105 ๏ด 10 −11 F/m Y1 = j 2๏ฐ ( 60 )1.105 ๏ด 10 −11 (1000 ) = j 4.167 ๏ด 10 −6 S/km The positive sequence shunt capacitance and shunt admittance both decrease 3.3% (increase 4.5%) as the phase spacing increases by 20% (decreases by 20%) 4.36 (a) Equations (4.10.4) and (4.10.5) apply. For a 2-conductor bundle, the GMR Dsc = rd = 0.0074 ๏ด 0.3 = 0.0471 The GMD is given by Deq = 3 6 ๏ด 6 ๏ด 12 = 7.56m Hence the line-to-neutral capacitance is given by Can = or 2๏ฐ๏ฅ F/m ln( Deq / Dsc ) 55.63 = 10.95nF/km ln ( 7.56 / 0.0471) ( with ๏ฅ = ๏ฅ 0 ) or 1.609 ๏ด 10.95 = 17.62 n F/mi (b) The capacitive reactance at 60 HZ is calculated as XC = Deq 1 = 29.63 ๏ด 103 ln ๏ − mi 2๏ฐ ( 60 ) Can Dsc = 29.63 ๏ด 10 3 ln 7.56 = 150,500 ๏ − mi 0.0471 or 150,500 ๏ด 1.609 = 242,154 ๏ − km 76 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (c) With the line length of 100 mi, the capacitive reactance is found as 150,500 = 1505 ๏ / Phase 100 4.37 (a) Eq (4.9.15): capacitance to neutral = XC = 2๏ฐ๏ฅ F/m ln( D / r ) 1 ln( D / r ) = ๏ ๏ m to neutral 2๏ฐ fC (2๏ฐ f )(2๏ฐ๏ฅ ) with f = 60HZ, ๏ฅ = 8.854 ๏ด 10 −12 F/m . or XC = k ๏ข log ( D / r ) , where k ๏ข = ๏ฆ1๏ถ = k ๏ข log D + k ๏ข log ๏ง ๏ท , ๏จr๏ธ 4.1 ๏ด 106 , ๏ ๏ mile to neutral ๏ฌ f where k ๏ข = 0.06833 ๏ด 106 at f = 60 HZ . (b) X d๏ข = k ๏ข log D = 0.06833 ๏ด 106 log (10 ) = 68.33 ๏ด 103 1 ๏ฆ1๏ถ X a๏ข = k ๏ข log ๏ง ๏ท = 0.06833 ๏ด 106 log = 80.32 ๏ด 103 0.06677 ๏จr๏ธ ๏ Xc = X d๏ข + X a๏ข = 148.65 ๏ด 103 ๏ ๏ mi to neutral ๏ฌ When spacing is doubled, X d๏ข = 0.06833 ๏ด 106 log ( 20 ) = 88.9 ๏ด 103 Then XC = 169.12 ๏ด 103 ๏ ๏ mi to neutral ๏ฌ 4.38 ๏ฆ 52.95 /12 ๏ถ C = 0.0389 / log ๏ง = 0.018๏ญ F/mi/ph . ๏ง 0.721/ (12 ๏ด 2 ) ๏ท๏ท ๏จ ๏ธ XC = 1 = 147.366 ๏ด 103 ๏ ๏ mi ๏ฌ 2๏ฐ ( 60 ) 0.018 ๏ด 10 −6 3 4.39 ๐ท๐๐ = √7.5 ⋅ 7.5 ⋅ 15 = 9.45 m; From Table A.4, ๐ = ๐ถ1 = 2๐๐0 ๐ท ln( ) ๐ = 1.196 0.0254m in 1in = 0.01519m; 2 2๐ 8.854×10−12 ln( 9.45 ) 0.01519 = 8.648 × 10−12 F/m; S ๐ = ๐๐๐ถ = ๐2๐(60)8.648 = ๐3.260 × 10−6 km 77 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 3 4.40 (a) ๐ท๐๐ = √8.25 ⋅ 8.25 ⋅ 16.5 = 8.50 m; ๐ถ1 = 2๐๐0 ๐ท ln( ) ๐ = 2๐ 8.854×10−12 ln( 8.50 ) 0.01519 = 8.522 × 10−12 F/m ๐ = ๐๐๐ถ = ๐2๐(60)8.648 = ๐3.213 × 10−6 S km 3 (b) ๐ท๐๐ = √6.75 ⋅ 6.75 ⋅ 13.5 = 10.39 m; ๐ถ1 = 2๐๐0 ๐ท ln( ) ๐ = 2๐ 8.854×10−12 ln( 10.39 ) 0.01519 = 8.792 × 10−12 F/m; ๐ = ๐๐๐ถ = ๐2๐(60)8.648 = ๐3.315 × 10−6 4.41 S km Deq = 3 10 ๏ด 10 ๏ด 20 = 12.6m From Table A.4, r = 1.293 ๏ฆ 0.0254 m ๏ถ in ๏ง ๏ท = 0.01642 m 2 ๏จ 1in ๏ธ DSC = 3 rd 2 = 3 0.01642(0.5)2 = 0.16 m C1 = 2๏ฐ ( 8.854 ๏ด 10 −12 ) 2๏ฐ๏ฅ 0 = = 1.275 ๏ด 10 −11 F/m Deq ๏ฆ 12.6 ๏ถ ln ๏ง ln ๏ท DSc ๏จ 0.16 ๏ธ Y1 = j๏ทC1 = j 2๏ฐ ( 60 )1.275 ๏ด 10 −11 (1000 ) = j 4.807 ๏ด 10 −6 S/km Q1 = VLL 2Y1 = ( 500 ) 4.807 ๏ด 10 −6 = 1.2 MVAR/ km 2 4.42 (a) From Table A.4, r = 1.424 ( 0.0254 ) = 0.0181m 2 DSc = 3 0.0181( 0.5 ) = 0.1654 m 2 C1 = 2๏ฐ ( 8.854 ๏ด 10 −12 ) = 1.284 ๏ด 10 −11 F/m ๏ฆ 12.6 ๏ถ ln ๏ง ๏ท ๏จ 0.1654 ๏ธ Y1 = j 2๏ฐ ( 60 ) (1.284 ๏ด 10 −11 ) (1000 ) = j 4.842 ๏ด 10 −6 S/km Q1 = ( 500 ) 4.842 ๏ด 10 −6 = 1.21MVAR/ km 2 (b) r = 1.162 2 ( 0.0254 ) = 0.01476 m; DSc = 3 0.01476 ( 0.5 ) = 0.1546 m 2 C1 = 2๏ฐ ( 8.854 ๏ด 10 −12 ) = 1.265 ๏ด 10 −11 F/m ๏ฆ 12.6 ๏ถ ln ๏ง ๏ท ๏จ 0.1546 ๏ธ Y1 = j 2๏ฐ ( 60 )1.265 ๏ด 10 −11 (1000 ) = 4.77 ๏ด 10 −6 S/km Q1 = ( 500 ) 4.77 ๏ด 10 −6 = 1.192 MVAR/ km 2 78 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. C1,Y1, and Q1 increase 0.8% (decrease 0.7%) For the larger, 1351 kcmil conductors (smaller, 700 kcmil conductors). 4.43 (a) For Drake, Table A.4 lists the outside diameter as 1.108 in ๏ r= 1.108 = 0.0462 ft 2 ๏ด 12 Deq = 3 20 ๏ด 20 ๏ด 38 = 24.8ft Can = 2๏ฐ ๏ด 8.85 ๏ด 10 −12 = 8.8466 ๏ด 10 −12 F/m ln ( 24.8 / 0.0462 ) XC = 1012 = 0.1864 ๏ด 106 ๏ ๏ mi 2๏ฐ (60)8.8466 ๏ด 1609 (b) For a length of 175 mi 0.1864 ๏ด 106 = 1065 ๏ to neutral 175 220 ๏ด 103 1 0.22 I chg = = = 0.681A/mi XC 3 3 ๏ด 0.1864 Capacitive reactance = or 0.681๏ด175 = 119A for the line Total three-phase reactive power supplied by the capacitance is given by 3 ๏ด 220 ๏ด 119 ๏ด 10 −3 = 43.5MVAR 4.44 ๏ฆ 51.87 ๏ถ C = 0.0389 log ๏ง ๏ท = 0.0212 ๏ญ F /mi/ph ๏จ 0.7561 ๏ธ ๏ฉ Note: Equivalent radius of a 4-cond. bundle is given by ๏น ๏ช ๏บ 3 1/ 4 3 1/ 4 ๏ซ๏ช 1.091( 0.0498 d ) = 1.091( 0.0498 ๏ด 1.667 ) = 0.7561ft ๏ป๏บ XC = 1 = 125.122 ๏ด 103 ๏ ๏ mi ๏ฌ −6 2๏ฐ ( 60 ) 0.0212 ๏ด 10 79 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 4.45 From Example 4.8, 2๏ฐ๏ฅ 0 C Xn = = ๏ฆD๏ถ ๏ฆ HXY ๏ถ Ln ๏ง ๏ท − Ln ๏ง ๏ท ๏จ๏๏ธ ๏จ HXX ๏ธ C Xn = 1.3247 ๏ด 10 −11 2๏ฐ ( 8.854 ๏ด 10 −12 ) ๏ฆ 0.5 ๏ถ ๏ฆ 20.006 ๏ถ Ln ๏ง − Ln ๏ง ๏ท ๏ท ๏จ 0.0075 ๏ธ ๏จ 20 ๏ธ F which is 0.01% larger than in Problem 4.32 m 4.46 (a) Deq = 3 12 ๏ด 12 ๏ด 24 = 15.12m r = 0.0328 / 2 = 0.0164 m XC = Where 1 2๏ฐ fCan 2๏ฐ ๏ด 8.85 ๏ด 10 −12 ln (15.12 / 0.0164 ) Can = ๏ XC = 2.86 15.12 ๏ด 10 9 ln = 3.254 ๏ด 108 ๏ ๏ m 60 0.016 ๏ For 125 km, XC = 3.254 ๏ด 108 = 2603 ๏ 125 ๏ด 1000 (b) H1 = H2 = H3 = 40m H12 = H23 = 402 + 122 = 41.761m H31 = 402 + 242 = 46.648m Deq = 15.12 m and r = 0.0164 m 80 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ XC = ๏ฉ Deq 1 H12 H 23 H31 ๏น 2.86 ๏ด 10 9 ๏ช ln − ln ๏บ๏๏m 60 3 H1 H 2 H3 ๏ป ๏ซ r ๏ฉ 15.12 1 41.761 ๏ด 41.761 ๏ด 46.648 ๏น = 4.77 ๏ด 107 ๏ช ln − ln ๏บ 40 ๏ด 40 ๏ด 40 ๏ซ 0.0164 3 ๏ป 8 = 3.218 ๏ด10 ๏ ๏ m For 125 km, XC = 3.218 ๏ด 108 = 2574 ๏ 125 ๏ด 103 4.47 D = 10 ft; r = 0.06677 ft; Hxx = 160 ft.; H xy = 1602 + 102 = 160.3ft (See Fig. 4.24 of text) Line-to-line capacitance C xy = ๏ฐ๏ฅ H D ln − ln xy r H xx F/ m (See Ex. 4.8 of the text) C xy = ๏ฐ ( 8.854 ๏ด 10 −12 ) ๏ฆ 10 ๏ถ ๏ฆ 160.3 ๏ถ ln ๏ง ๏ท − ln ๏ง 160 ๏ท 0.06677 ๏จ ๏ธ ๏จ ๏ธ Neglecting Earth effect, C xy = = 5.555 ๏ด 10 −12 F/ m ๏ฐ ( 8.854 ๏ด 10 −12 ) ๏ฆ 10 ๏ถ ln ๏ง ๏ท ๏จ 0.06677 ๏ธ = 5.553 ๏ด 10 −12 F/ m Error - percentage = 5.555 − 5.553 ๏ด 100 = 0.036% 5.555 When the phase separation is doubled, D = 20 ft H xy = 1602 + 202 = 161.245 With effect of Earth, C xy = ๏ฐ ( 8.854 ๏ด 10 −12 ) ๏ฆ 20 ๏ถ ๏ฆ 161.245 ๏ถ ln ๏ง − ln ๏ง ๏ท ๏ท ๏จ 0.06677 ๏ธ ๏จ 160 ๏ธ = 4.885 ๏ด 10−12 F/m 81 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Neglecting Earth effect, C xy = ๏ฐ ( 8.854 ๏ด 10 −12 ) ๏ฆ 20 ๏ถ ln ๏ง ๏ท ๏จ 0.06677 ๏ธ = 4.878 ๏ด 10−12 F/ m Error percentage = 4.885 − 4.878 ๏ด 100 = 0.143% 4.885 4.48 (a) H1 = H2 = H3 = 2 ๏ด 50 = 100 ft H12 = H 23 = 252 + 100 2 = 103.08ft H13 = 50 2 + 100 2 = 111.8ft Deq = 3 ( 25 )( 25 )( 50 ) = 31.5ft r= Can = 1.065 = 0.0444 ft 2 ๏ด 12 2๏ฐ ( 8.854 ๏ด 10 −12 ) ๏ฆ 31.5 ๏ถ ๏ฆ 106 ๏ถ ln ๏ง − ln ๏ง ๏ท ๏ท ๏จ 0.0444 ๏ธ ๏จ 100 ๏ธ = 9.7695 ๏ด 10 −12 F/ m ๏ฌ ๏ฉ Note : H m = (103.08 ๏ด 103.08 ๏ด 111.8)1/ 3 = 106ft ๏น ๏ช ๏บ H s = 100ft ๏ช๏ซ ๏บ๏ป (b) Neglecting the effect of ground, Can = 2๏ฐ ( 8.854 ๏ด 10 −12 ) ๏ฆ 31.5 ๏ถ ln ๏ง ๏ท ๏จ 0.0444 ๏ธ = 8.4746 ๏ด 10 −12 F/ m Effect of ground gives a higher value. Error percent = 4.49 9.7695 − 8.4746 ๏ด 100 = 13.25% 9.7695 GMD = ( 60 ๏ด 60 ๏ด 120 ) 1/ 3 r= or = 75.6ft 1.16 ๏ฐ = 0.0483ft; N = 4; S = 2 A sin 2 ๏ด 12 N A= 18 = 1.0608ft ( 2sin 45๏ฐ )12 82 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. N −1 GMR = ๏ฉrN ( A ) ๏น ๏ซ ๏ป ๏ Can = 1/ N 3 1/ 4 = ๏ฉ0.0483 ๏ด 4 ๏ด (1.0608 ) ๏น ๏ซ ๏ป = 0.693ft 2๏ฐ ( 8.854 ๏ด 10 −12 ) ๏ฆ 75.6 ๏ถ ln ๏ง ๏ท ๏จ 0.693 ๏ธ = 11.856 ๏ด 10 −12 F/m ๏ฌ Next X d๏ข = 0.0683log ( 75.6 ) = 0.1283 ๏ฆ 1 ๏ถ X a๏ข = 0.0683log ๏ง ๏ท = 0.0109 ๏จ 0.693 ๏ธ X c = X a๏ข + X d๏ข = 0.1392 M ๏ ๏ mi to neutral = 0.1392 ๏ด 106 ๏ ๏ mi to neutral ๏ฌ 4.50 From Problem 4.45 1 1 F C xy = C xn = (1.3247 ๏ด 10−11 ) = 6.6235 ๏ด 10−12 2 2 m with Vxy = 20 kV Qx = C xy Vxy = ( 6.6235 ๏ด 10−12 )( 20 ๏ด 103 ) = 1.3247 ๏ด 10−7 C m From Eq (4.12.1) The conductor surface electric field strength is: ET = 1.3247 ๏ด 10 −7 ( 2๏ฐ ) (8.854 ๏ด 10 −12 ) ( 0.0075 ) = 3.1750 ๏ด 10 5 = 3.175 V ๏ฆ kV ๏ถ๏ฆ m ๏ถ ๏ด ๏ท m ๏ง๏จ 1000 V ๏ท๏ง ๏ธ๏จ 100 cm ๏ธ kVrms cm Using Eq (4.12.6), the ground level electric field strength directly under the conductor is: ๏ฉ ( 2 )(10 ) ( 2 )(10 ) ๏น๏บ 1.3247 ๏ด 10 −7 ๏ช − 2 −12 ( 2๏ฐ ) (8.854 ๏ด 10 ) ๏ช๏ซ (10 ) (10 )2 + ( 0.5)2 ๏บ๏ป V ๏ฆ kV ๏ถ kV = 1.188 ๏ด ๏ง = 0.001188 ๏ท m ๏จ 1000 V ๏ธ m Ek = 83 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 4.51 (a) From Problem 4.30, 2๏ฐ ( 8.854 ๏ด 10 −12 ) C xn = ๏ฆ 0.5 ๏ถ ๏ฆ 20.006 ๏ถ Ln ๏ง − Ln ๏ง ๏ท ๏ท ๏จ 0.009375 ๏ธ ๏จ 20 ๏ธ 1 F C xy = C xn = 6.995 ๏ด 10 −12 2 m = 1.3991 ๏ด 10 −11 F m Qx = C xy Vxy = ( 6.995 ๏ด 10 −12 )( 20 ๏ด 103 ) = 1.399 ๏ด 10 −7 E๏ = c m 1.399 ๏ด 10 −7 ๏ฆ 1 ๏ถ๏ฆ 1 ๏ถ ๏ด๏ง ๏ท −12 ( 2๏ฐ ) (8,854 ๏ด 10 ) ( 0.009375 ) ๏จ 1000 ๏ท๏ง ๏ธ๏จ 100 ๏ธ = 2.682 kVrms cm ๏ฉ ( 2 )(10 ) ( 2 )(10 ) ๏น๏บ 1.399 ๏ด 10 −7 ๏ช − 2 ( 2๏ฐ ) (8.854 ๏ด 10 −12 ) ๏ช๏ซ (10 ) (10 )2 + ( 0.5 )2 ๏บ๏ป V ๏ฆ kV ๏ถ kV = 1.254 ๏ด ๏ง = 0.001254 ๏ท m ๏จ 1000 V ๏ธ m Ek = (b) C xn = 2๏ฐ ( 8.854 ๏ด 10 −12 ) ๏ฆ 0.5 ๏ถ ๏ฆ 20.06 ๏ถ Ln ๏ง − Ln ๏ง ๏ท ๏ท ๏จ .005625 ๏ธ ๏จ 20 ๏ธ = 1.2398 ๏ด 10 −11 F m 1 F C xy = C xn = 6.199 ๏ด 10 −12 2 m Qx = C xy Vxy = ( 6.199 ๏ด 10 −12 )( 20 ๏ด 103 ) = 1.2398 ๏ด 10 −7 E๏ = c m 1.2398 ๏ด 10 −7 ๏ฆ 1 ๏ถ๏ฆ 1 ๏ถ ๏ด๏ง ๏ท −12 ( 2๏ฐ ) (8.854 ๏ด 10 ) (.005625) ๏จ 1000 ๏ท๏ง ๏ธ๏จ 100 ๏ธ E๏ = 3.962 kVrms cm ๏ฉ ( 2 )(10 ) ( 2 )(10 ) ๏น๏บ 1.2398 ๏ด 10 −7 ๏ช − 2 ( 2๏ฐ ) (8.854 ๏ด 10 −12 ) ๏ช๏ซ (10 ) (10 )2 + ( 0.5)2 ๏บ๏ป V ๏ฆ kV ๏ถ kV Ek = 1.112 ๏ด ๏ง = 0.001112 ๏ท m ๏จ 1000 V ๏ธ m Eq = The conductor surface electric field strength E๏ decreases 15.5 % (increases 24.8%) as the conductor diameter increases 25 % (decreases 25%). The ground level electric field strength Ek increases 5.6 %( decreases 6.4%). 84 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Now, calculate ๏ฌ1 and ๏ฌ2 at the maximum generation conditions: Point 3 in Figure, now that ๏ฌ1 ๏พ ๏ฌ2 , unload unit 1 first until ๏ฌ1 is brought down to ๏ฌ1 = 420 which occurs at PG1 = 420 − 200 = 1.10 (Point 4 in Figure) 200 Notice that, for 0.72 ๏ฃ PL ๏ฃ 3.1 , it is possible to maintain equal ๏ฌ ’s. Equations are given by ๏ฌ1 = ๏ฌ2 ; 200 PG1 + 200 = 80 PG 2 + 260; and PG1 + PG 2 = PL These linear relationships are depicted in the Figure below: For PL = 282 MW = 2.82 pu, PG 2 = 2.82 − PG1 ; PG1 = 0.4 PG 2 + 0.3 = 1.128 − 0.4 PG1 + 0.3 1.4 PG1 = 1.428 or PG1 = 1.02 = 102 MW PG 2 = 2.82 − 1.02 = 1.8 = 180 MW Results are tabulated in the table given below: Table of Results Point PG1 PG 2 PL ๏ฌ1 ๏ฌ2 1 0.25 0.30 0.55 250 284 2 0.42 0.30 0.72 284 284 3 1.50 2.00 3.50 500 420 4 1.10 2.00 3.10 420 420 162 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 7.7 (To solve the problem change the Min MW field for generator 2 to 0 MW). The minimum value in the plot above occurs when the generation at bus 2 is equal to 180MW. This value corresponds to the value found in Example 7.20 for economic dispatch at generator 2 (181MW). 7.8 To achieve loss sensitivity values that are equal the generation at bus 2 should be about 159 MW and the generation at bus 4 should be about 215 MW. Minimum losses are 7.79 MW. The operating cost in Example 7.22 is lower than that found in this problem indicating that minimizing losses does not usually result in a minimum cost dispatch. The minimum loss one-line is given below. 20 MW 1.05 pu 1 20 MW A MVA 5 MW slack 3 103 MW 0.99 pu 25.8 MW 0.0000 24 MW AGC ON A 104 MW A MVA 78 MW 29 Mvar 4 147 MW 39 Mvar 1.00 pu 7 MW 215.0 MW -0.0003 OFF AGC A MVA 5 MW 1.04 pu MVA MVA 38 MW A 7 MW 93 MW 2 39 MW 20 Mvar A A MVA 25 MW MVA 89 MW 5 159.0 MW -0.0001 OFF AGC 0.96 pu 127 MW 39 Mvar Total Hourly Cost: 6437.97 $/h Load Scalar: 1.00 Total Area Load: 392.0 MW MW Losses: Marginal Cost ($/MWh): At Min Gen $/MWh 7.79 MW 163 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 7.9 To achieve loss sensitivity values that are equal the generation at bus 2 should be about 230 MW and the generation at bus 4 should be at its maximum limit of 300 MW. Minimum losses are 15.38 MW. The minimum loss one-line is given below. 29 MW 28 MW A 1.05 pu 1 MVA 3 143 MW 0.98 pu 33.9 MW 0.0000 35 MW AGC ON 5 MW slack A 145 MW A MVA 206 MW 55 Mvar 1.00 pu 11 MW A MVA MVA 5 MW 1.04 pu A 97% A 300.0 MW -0.0055 OFF AGC MVA MVA 36 MW 110 MW 41 Mvar 4 53 MW A 11 MW 133 MW 2 55 MW 27 Mvar MVA 125 MW 5 230.3 MW 0.0000 OFF AGC 0.92 pu 178 MW 55 Mvar Total Hourly Cost: 9404.56 $/h Load Scalar: 1.40 Total Area Load: 548.8 MW MW Losses: Marginal Cost ($/MWh): At Min Gen $/MWh 15.38 MW 7.10 The line between buses 2 and 5 reaches 100% at a load scalar of about 1.68; above this value the flow on this line is constrained to 100%, causing the additional load into bus 5 to increase the flow on the line between buses 4 and 5. This line reaches its limit at a load scalar of 1.81. Since both lines into bus 5 are loaded at 100%, no additional load can be brought into the bus without causing at least one of these lines to be overloaded. The plot of the bus 5 MW marginal cost is given below. 164 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 7.11 The OPF solution for this case is given below, with an operating cost of 16,091.6 $/hr. The marginal cost at bus UIUC69 is 41.82 $/hr. Increasing the UIUC69 MW load from 61 to 62 MW increases the operating cost to $16,132.80, an increase of $41.2, verifying the marginal cost. Similarly at the DEMAR69 bus the marginal cost is 17.74 $/hr; increasing the load from 44 to 45 MW increases the operating cost by $17.8. Note, because of convergence tolerances the manually calculated changes may differ slightly from the marginal cost values. SLA CK345 A MVA A MVA Total Cost: 16091.6 $/h 1.02 pu 1.02 pu A A MVA MVA A SLA CK138 1.01 pu A MVA RA Y138 A 1.03 pu A MVA 33 MW 13 Mvar A A A 15.9 Mvar 1.02 pu TIM69 1.02 pu PA I69 1.01 pu GROSS69 20 MW 8 Mvar 1.00 pu A PETE69 MVA HA NNA H69 51 MW 15 Mvar 58 MW 40 Mvar DEMA R69 44.0 MW UIUC69 1.00 pu 0.99 pu A MA NDA 69 A 12.6 Mvar A MVA HA LE69 MVA 60 MW 12 Mvar BLT138 A 99% MVA 1.01 pu MVA LA UF69 49 MW 16 Mvar 1.00 pu A MVA 23 MW 6 Mvar A 22 MW 15 Mvar BUCKY138 ROGER69 2 Mvar A MVA 1.02 pu SA VOY69 A 38 MW 2 Mvar JO138 MVA A MVA 7.12 14 MW 14 MW 3 Mvar 1.02 pu MVA MVA 45 MW 0 Mvar A MVA A A 10 MW 5 Mvar MVA 1.01 pu PA TTEN69 WEBER69 LA UF138 1.01 pu A MVA 1.00 pu 1.01 pu A MVA MVA A 7.3 Mvar 1.00 pu 1.02 pu MVA 15 MW 5 Mvar 15 MW 60 Mvar A A 1.02 pu SHIMKO69 7.4 Mvar A BLT69 1.01 pu MVA 36 MW 10 Mvar MVA LYNN138 14 MW 4 Mvar MVA MVA 1.00 pu A A 0.0 Mvar 13 Mvar 0 MW 0 Mvar A A A MVA BOB69 56 MW 0.99 pu 36 Mvar 33 MW 10 Mvar MVA A MVA A MVA 1.02 pu 24 MW 45 Mvar MVA MVA BOB138 A A 61.0 MW MVA 15 MW 3 Mvar 1.00 pu 0.99 pu MVA MVA 0.99 pu A A A 0.996 pu MVA A A MVA 12 Mvar 28.8 Mvar 14.3 Mvar HOMER69 WOLEN69 4.8 Mvar MVA 1.00 pu 1.01 pu 21 MW 7 Mvar MVA HISKY69 MVA A 12 MW 5 Mvar 13 Mvar MVA FERNA 69 A MORO138 A A MVA A MVA 37 MW 17 MW 3 Mvar MVA 1.01 pu MVA 1.02 pu RA Y69 A A 23 MW 7 Mvar MVA MVA 18 MW 5 Mvar MVA MVA A MVA TIM138 1.00 pu 398 MW 72 Mvar RA Y345 slack TIM345 JO345 A SA VOY138 A MVA 150 MW 1 Mvar MVA The economic dispatch solution would be ๐๐บ1 = 400 MW, ๐๐บ2 = 370 MW, ๐๐บ3 = 50 MW. With this solution, the angles would be ๐ฟ1 = 0, ๐ฟ2 = 0.8°, ๐ฟ3 = −8.0°. The line flows would be ๐น12 = −20 MW, ๐น13 = 280 MW, ๐๐๐ ๐น23 = 85 MW This is not a valid solution because the line flow limits F13 of 120 MW is violated. 7.13 In example 7.6, the solution is ๐๐บ1 = 394 MW, ๐๐บ2 = 150 MW, ๐๐บ3 = 276 MW. The resulting LMPs are ๐1 = 18 $/MWh, ๐2 = 9.72 $/MWh, ๐3 = 31 $/MWh. Why is there this variation in LMPs? 165 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Chapter 8 Symmetrical Faults 8.1 (a) Z = R + j๏ท L = 0.4 + j ( 2.๏ฐ .60 ) 2 ๏ด 10 −3 = 0.4 + j 0.754 = 0.8535๏62.05๏ฐ ๏ Z = 0.8535 ๏ and ๏ฑ = 62.05๏ฐ I ac = V 277 = = 324.5A Z 0.8535 (b) Irms (0) = I ac k (0) = 324.5 3 = 562.1 A (c) Using Eq. (8.1.12), with X 0.754 = = 1.885 R 0.4 k (๏ด = 5cycles) = 1 − 2 e−4๏ฐ (5) 1.885 1.0 I rms (๏ด = 5cycles) = I ac k (5cycles) = 324.5A (d) From Eq. (8.1.1) ๏ฆ 300 ๏ถ ๏ฆ 300 ๏ถ V (0) = 2 V sin ๏ก = 300; ๏ก = sin −1 ๏ง๏ง ๏ท๏ท = sin −1 ๏ง๏ง ๏ท๏ท = 49.98๏ฐ ๏จ 2V ๏ธ ๏จ 2 277 ๏ธ From Eq. (8.1.4) 2V sin (๏ก − ๏ฑ ) e − t / T Z 2 (277) =− sin ( 49.98๏ฐ − 62.05๏ฐ ) e − t / T 0.8535 = 95.98e − t / T idc (t ) = − where T = L 2 ๏ด 10−3 = = 5 ๏ด 10−3 s R 0.4 idc (t ) = 95.98 e−t (5๏ด10 ) A −3 8.2 (a) Z = 1 + j 2 = 2.236๏63.43๏ฐ๏ I ac = V Z = 4000 2.236 = 1789 A (b) I rms (0) = 1789 3 = 3098 A (c) with X R = 2, k (5) = 1 + 2e−4๏ฐ (5)/2 1.0 I rms (5) = k (5)I ac = (1.0 )(1789) = 1789 A ( ) (d) ๏ก = sin −1 300 4000 2 = 3.04๏ฐ; 166 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. T= X 2 = = 5.305 ๏ด 10−3 s ๏ท R (2๏ฐ .60)(1) idc (t ) = − 2(4000) sin ( 3.04๏ฐ − 63.43๏ฐ ) e − t / T 2.236 = 2200e − t ( 5.305๏ด10 ) A −3 8.3 Z = 0.125 + j 2๏ฐ (60)0.01 = 0.125 + j3.77 = 3.772 ๏88.1๏ฐ๏ 1 40 = A 2 3.772 2 T = L/R = 0.08Sec. I ac rms = 151 The response is then given by i(๏ฌ ) = 40sin (๏ท t + ๏ก − 88.1๏ฐ ) − 40e − t / 0.08 sin (๏ก − 88.1๏ฐ ) (a) No dc offset, if switch is closed when ๏ก = 88.1๏ฐ . (b) Maximum dc offset, when ๏ก = 88.1๏ฐ − 90๏ฐ = −1.9๏ฐ Current waveforms with no dc offset (a), and with Max. dc offset (b) are shown below: 167 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 8.4 (a) For X / R = 0 , i(t ) = 2 I rms ๏ฉ๏ซsin (๏ทt − ๏ฑ Z )๏น๏ป ๏ฌ (b) The wave form represents a sine wave, with ๏ฌ no dc offset. For X / R = ๏ฅ, i (t ) = 2 I rms ๏ฉ๏ซsin (๏ทt − ๏ฑ Z ) + sin ๏ฑ Z ๏น๏ป ๏ฌ The dc offset is maximum for (X/R) equal to infinity. ๏ฌ (c) For ( X/R ) = 0, Asymmetrical Factor = 1.4141 ๏ผ ๏ฏ For ( X/R ) = ๏ฅ, Asymmetrical Factor = 2.8283 ๏ฏ ๏ฝ The time of peak, t p , For X / R = 0, is 4.2 ms.๏ฏ ๏ฌ and For X / R = ๏ฅ,is 8.3 ms. ๏ฏ๏พ Note: The multiplying factor that is used to determine the maximum peak instantaneous fault current can be calculated by taking the derivative of the bracketed term of the given equation for i(t) in PR.8.4 with respect to time and equating to zero, and then solving for the time of maximum peak tp; substituting tp into the equation, the appropriate multiplying factor can be determined. 168 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 8.5 VL − N = VL − L 3 = 13.2 ๏ด 103 3 = 7621V RMS symmetrical fault current, I rms = 7621 ( 0.52 + 1.52 ) 2 1 = 4820 A ๏ฌ X/R Ratio of the system is 1.5 = 3 , for which the asymmetrical factor is 1.9495. 0.5 ๏ The maximum peak instantaneous value of fault current is I max peak = 1.9495 ( 4820 ) = 9397 A ๏ฌ ๏ผ ๏ฏ able to withstand a peak current of approximately ๏ฝ ๏ฌ ๏ฏ 9400 A. ๏พ All substation electrical equipment must be 8.6 (a) Neglecting the transformer winding resistance, I ๏ข๏ข = Eq 1.0 1 = = = 3.704 pu X d๏ข๏ข + XTR 0.17 + 0.1 0.27 The base current on the HV side of the transformer is: Srated I base H = 3 Vrated H = 1000 3 ( 345 ) = 1.673 kA I ๏ข๏ข = 3.704 ๏ด 1.673 = 6.198 kA (b) Using Eq (8.2.1) at t = 3 cycles = 0.05 S with the transformer reactance included, ๏ฉ๏ฆ 1 1 ๏ถ −0.05 0.05 ๏ฆ 1 1 ๏ถ −0.05 1.0 1 ๏น I ac ( 0.05) = 1.0 ๏ช๏ง − e +๏ง − + ๏ท ๏ทe 1.6 ๏บ๏ป ๏จ 0.4 1.6 ๏ธ ๏ซ๏จ 0.27 0.4 ๏ธ = 2.851 Pu From Eq (8.2.5) idc (t ) = 2 ( 3.704 ) e−t / 0.1 = 5.238e−t / 0.1 pu The rms asymmetrical current that the breaker interrupts is I rms ( 0.05S ) = I ac2 ( 0.05 ) + idc2 ( 0.05 ) ( 2.851) + ( 5.238) e−2( 0.05) 0.1 = 4.269 pu = 4.269 (1.673) = 7.144 kA = 2 2 169 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 8.7 (a) Using Eq. (8.2.1) with the transformer reactance included, and with ๏ก = 0๏ฐ for maximum dc offset, ๏ฉ๏ฆ 1 1 ๏ถ − t / 0.05 ๏ฆ 1 1 ๏ถ − t /1.0 1 ๏น ๏ฆ ๏ฐ๏ถ iac (t ) = 2 (1.0) ๏ช๏ง − +๏ง − + sin ๏ง ๏ท t − ๏ท ๏ทe ๏ทe ๏บ 1.6 ๏ป ๏จ 2๏ธ ๏จ 0.4 1.6 ๏ธ ๏ซ๏จ 0.27 0.4 ๏ธ ๏ฐ๏ถ ๏ฆ = 2 ๏ฉ๏ซ1.204 e − t / 0.05 + 1.875 e − t /1.0 + 0.625๏ป๏นsin ๏ง ๏ท t − ๏ท pu 2๏ธ ๏จ The generator base current is I base L = srated = 3 Vrated L − L 1000 3 ( 20 ) = 28.87 kA ๏ฐ๏ถ ๏ฆ ๏ iac (t ) = 40.83 ๏ฉ๏ซ1.204 e − t / 0.05 + 1.875e − t /1.0 + 0.625 ๏น๏ป sin ๏ง ๏ทt − ๏ท kA 2๏ธ ๏จ where the effect of the transformer on the time constants has been neglected. (b) From Eq. (8.2.5) and the results of Problem 8.6, idc (t ) = 3 I ๏ข๏ขe− t / TA = 2 ( 3.704 ) e − t / 0.1 = 5.238 e− t 0.1 pu = 151.2 e− t 0.1 kA 8.8 (a) iac (t ) = 10 (1 + e− t / 200 + 6 e−t /15 ) , t in ms and i in kA. The plot is show below: (b) I base = 300 = 12551A; Z base = 0.0138 3 i(k ) = 0.797 (1 + e − t / ๏ด1 + 6e − t / ๏ด 2 ) pu (13.8)2 = 0.635 ๏ 300 1 = 1.255pu t →๏ฅ 0.797 1 lim i(t ) = 8 ๏ด 0.797; ๏ X d๏ข๏ข = = 0.157 pu t →0 8 ๏ด 0.797 lim i(k ) = 0.797; ๏ X d = X d = 1.255 ๏ด 0.635 = 0.797 ๏ X d๏ข๏ข = 0.157 ๏ด 0.635 = 0.996 ๏ 170 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 8.9 The prefault and postfault per-phase equivalent circuits are shown below: Vf = 14.5 = 0.967๏0๏ฐ pu , taken as reference 15 60 ๏ด 106 Base Current = = 2309.5A 3 ๏ด 15 ๏ด 103 40 ๏ด 103 ๏36.9๏ฐ I MOTOR = = 1991๏36.9๏ฐ A 0.8 ๏ด 3 ๏ด 14.5 = 0.8621๏36.9๏ฐ pu = ( 0.69 + j 0.52 ) pu For the generator, Vt = 0.967 + j 0.1( 0.69 + j 0.52 ) = ( 0.915 + j 0.069 ) pu Eg๏ข๏ข = 0.915 + j 0.069 + j 0.1( 0.69 + j 0.52 ) = ( 0.863 + j 0.138 ) pu I g๏ข๏ข = 0.863 + j 0.138 = ( 0.69 − j 4.315 ) pu j 0.2 = 2309.5 ( 0.69 − j 4.315 ) = (1593.6 − j 9965.5) A ๏ฌ For the motor: Vt = V f = 0.967 ๏0๏ฐ Em๏ข๏ข = 0.967 − j 0.1( 0.69 + j 0.52 ) = (1.019 − j 0.069 ) pu I m๏ข๏ข = 1.019 − j 0.069 = ( −0.69 − j10.19 ) pu j 0.1 = 2309.5 ( −0.69 − j10.19 ) = −1593.6 − j 23533.8 A ๏ฌ In the fault: I ๏ข๏ขf = I g๏ข๏ข + I m๏ข๏ข = 0.69 − j 4.315 − 0.69 − j10.19 = − j14.505pu = − j14.505 ๏ด 2309.5 = − j 33,499 A ๏ฌ Note: The fault current is very high since the subtransient reactance of synchronous machines and the external line reactance are low. 171 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 8.10 The pre-fault load current in pu is IL = S pu Vpu ๏ − cos(PF) = 1.0 ๏ − cos−1 ( 0.8 ) = 1.0 ๏ − 36.86๏ฐpu 1.0 The initial generator voltage behind the subtransient reactance is Eg๏ข๏ข = V + j ( X๏ก๏ข๏ข + XTR ) I L = 1.0 ๏0๏ฐ + ( j 0.27 )(1.0๏ − 36.86๏ฐ ) = 1.162 + j 0.216 = 1.182 ๏10.53๏ฐ pu The subtransient fault current is I ๏ข๏ข = Eg๏ข๏ข j ( X d๏ข๏ข + XTR ) = 1.182 ๏10.53๏ฐ j 0.27 = 4.378 ๏ − 79.47๏ฐpu I ๏ข๏ข = 4.378 (1.673 ) ๏ − 79.47๏ฐ = 7.326 ๏ − 79.47๏ฐkA Alternatively, using superposition, I ๏ข๏ข = I1๏ข๏ข + I 2๏ข๏ข = I1๏ข๏ข + I L = 3.704 ๏ − 90๏ฐ + 1.0๏ − 36.86๏ฐ [From Pr. 8.6 (a)] I ๏ข๏ข = 0.8 − j 4.304 = 4.378 ๏ − 79.47๏ฐ pu = 7.326 ๏ − 79.47๏ฐkA 8.11 The prefault load current in per unit is: IL = S 1.0 ๏ − cos−1 (P.F.) = ๏ − cos−1 0.95 = 0.9524 ๏ − 18.195๏ฐ per unit V 1.05 172 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. The internal machine voltages are: Eg๏ข๏ข = V + jX g๏ข๏ข I L = 1.05๏0๏ฐ + ( j 0.15 )( 0.9524๏ − 18.195๏ฐ ) = 1.05 + 0.1429๏71.81๏ฐ = 1.0946 + j 0.1358 = 1.1030๏7.072๏ฐ per unit Em๏ข๏ข = V − j ( XT 1 + X Line + XT 2 + X m๏ข๏ข ) I L = 1.05๏0๏ฐ − ( j 0.505 )( 0.9524 ๏ − 18.195๏ฐ ) = 1.05 + 0.48095๏ − 18.195๏ฐ = 0.8998 − j 0.4569 = 1.0092๏ − 26.92๏ฐ per unit The short circuit currents are: I g๏ข๏ข = I m๏ข๏ข = Eg๏ข๏ข jX g๏ข๏ข = 1.1030๏7.072๏ฐ = 7.353 ๏ − 82.93๏ฐ per unit j 0.15 Em๏ข๏ข 1.0092 ๏ − 26.92๏ฐ = = 1.998 ๏243.1๏ฐ per unit j ( X๏ด1 + X Line + X๏ด 2 + X m๏ข๏ข ) j 0.505 I F๏ข๏ข = I g๏ข๏ข + I m๏ข๏ข = 7.353๏ − 82.93๏ฐ + 1.998๏243.1๏ฐ = − j 9.079 per unit 8.12 Per Unit Positive Sequence Reactance Diagram ๏ฆ 1000 ๏ถ X g๏ข๏ข1 = ( 0.20 ) ๏ง ๏ท = 0.40 per unit ๏จ 500 ๏ธ X๏ข๏ขg 2 = ( 0.18 )(1000 / 750 ) = 0.24 Per unit XT 2 = ( 0.10 )(1000 / 750 ) = 0.1333per unit X ๏ข๏ขj 3 = 0.17 per unit XT 3 = 0.10 per unit Vbase 4 ( 500 ) = = 250 ๏ Sbase 1000 XT 1 = ( 0.12 )(1000 / 500 ) = 0.24 per unit 2 Z base 4 = X Line1.2 = X Line 2.3 = X Line 2.4 = 50 = 0.20 per unit 250 (a) XTh = ( 0.40 + 0.24 ) // ๏ฉ๏ซ0.20 + ( 0.20 + 0.10 + 0.17 ) // ( 0.20 + 0.1333 + 0.24 )๏น๏ป = 0.64 // ๏ 0.20 + 0.47 // 0.5733๏ = 0.64 // 0.4583 = 0.2670 per unit 173 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (b) VF = I F๏ข๏ข = 525 = 1.05๏0๏ฐ per unit 500 I base 4 = Sbase 3๏base 4 = 1000 ( 3 ) (500) = 1.155 kA VF 1.05๏0๏ฐ = = − j 3.933per unit = ( − j 3.933)(1.155 ) = − j 4.541 kA ZTh j 0.2670 (c) Using current division: I g๏ข๏ข1 = I F๏ข๏ข 0.4583 = ( − j 3.933)( 0.4173) = − j1.641per unit = − j1.896 kA ( 0.4583 + 0.64 ) 0.64 ๏ถ ๏ข๏ข 1.2 = I F๏ข๏ข ๏ฆ๏ง I Line ๏ท = ( − j 3.933)( 0.5827 ) = − j 2.292 per unit = − j 2.647 kA ๏จ 0.4583 + 0.64 ๏ธ 8.13 (a) XTh = ( 0.20 + 0.24 + 0.40 ) // ( 0.20 + 0.10 + 0.17 ) // ( 0.20 + 0.1333 + 0.24 ) XTh = 0.84 // 0.47 // 0.5733 = (b) I F๏ข๏ข = 1 = 0.1975per unit 1 1 1 + + 0.84 0.47 0.5733 VF 1.05๏0๏ฐ = = − j 5.3155per unit Z Th j 0.1975 I F๏ข๏ข = ( − j 5.3155 )(1.155 ) = − j 6.1379 kA 1.05๏0๏ฐ = − j1.25per unit = ( − j1.25 )(1.155 ) = − j1.443kA j 0.84 1.05๏0๏ฐ ๏ข๏ข = I 32 = − j 2.234 per unit = ( − j 2.234 )(1.155) = − j 2.580 kA j 0.47 1.05๏0๏ฐ ๏ข๏ข = I 42 = − j1.8315per unit = ( − j1.8315 )(1.155 ) = − j 2.115kA j 0.5733 (c) I12๏ข๏ข = 8.14 (a) Zone 1 Vbase1 = 10 kV 174 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Zone 2 Zone 3 Vbase 2 = 15 kV Vbase3 = 138 kV (138 ) = 190.44 ๏ = 2 Z base 3 100 2 ๏ฆ 12 ๏ถ ๏ฆ 100 ๏ถ X g๏ข๏ข1 = ( 0.20 ) ๏ง ๏ท ๏ง ๏ท = 0.576 per unit ๏จ 10 ๏ธ ๏จ 50 ๏ธ X g๏ข๏ข2 = 0.20 per unit ๏ฆ 100 ๏ถ XT 1 = ( 0.10 ) ๏ง ๏ท = 0.20 per unit ๏จ 50 ๏ธ XT 2 = 0.10 per unit X Line = 40 /190.44 = 0.21per unit (b) XTh = ( 0.20 ) // ( 0.576 + 0.20 + 0.21 + 0.21 + 0.10 ) = 0.20 //1.296 = 0.1733per unit VF = 1.0 per unit I F๏ข๏ข = (c) I base 2 = VF 1.0๏0๏ฐ = = − j 5.772 per unit ZTh j 0.1733 100 = 3.849 kA 15 3 I F๏ข๏ข = ( − j 5.772 )( 3.849 ) = − j 22.21kA (d) 1.0๏0๏ฐ = − j 5.0 per unit = ( − j 5.0 )( 3.849 ) = − j19.245kA j 0.20 1.0๏0๏ฐ I T๏ข๏ข2 = = − j 0.7716 per unit = ( − j 0.7716 )( 3.849 ) = − j 2.970 kA j1.296 I g๏ข๏ข2 = 8.15 (a) XTh = ( 0.20 + 0.10 ) // ( 0.576 + 0.20 + 0.21 + 0.21) = 0.30 //1.196 = 0.2398 per unit (b) I F๏ข๏ข = I base3 = 1.0๏0๏ฐ = − j 4.1695per unit j 0.2398 100 = 0.4184 kA 138 3 I F๏ข๏ข = ( − j 4.1695 )( 0.4184 ) = − j1.744 kA (c) I T๏ข๏ข2 = 1.0๏0๏ฐ = − j 3.333per unit = ( − j 3.333)( 0.4184 ) = − j1.395 kA j 0.30 ๏ข๏ข = I 34 1.0๏0๏ฐ = − j 0.836 per unit = ( − j 0.836 )( 0.4184 ) = − j 0.350 kA j1.196 175 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 8.16 Choosing base MVA as 30 MVA and the base line voltage at the HV-side of the transformer to be 33kV, 30 30 30 ๏ด 0.15 = 0.225pu; X G 2 = ๏ด 0.1 = 0.3pu; XTRANS = ๏ด 0.05 = 0.05pu 20 10 30 30 Z LINE = ( 3 + j15 ) 2 = ( 0.0826 + j 0.4132 ) pu 33 X G1 = The system with pu-values is shown below: ZTOTAL = 0.0826 + j 0.5918 = 0.5975๏82๏ฐ pu Then IF = I base = 1.0 = 1.674๏ − 82๏ฐ pu 0.5975๏82๏ฐ 30 ๏ด 106 3 33 ๏ด 10 = 524.8 A I F = 1.674 ๏ด 524.8 = 878.6 A 8.17 Choosing base values of 25 MVA and 13.8 kV on the generator side Generator reactance = 0.15 pu 2 Transformer reactance = 25 ๏ฆ 13.2 ๏ถ ๏ง ๏ท 0.11 = 0.101 pu 25 ๏จ 13.8 ๏ธ Base voltage at the transmission line is 13.8 ๏ด Per-unit line reactance: 65 69 = 72.136 kV 13.2 25 ( 72.136 ) 2 = 0.312 2 25 ๏ฆ 13 ๏ถ X M = 0.15 ๏ด ๏ด ๏ง ๏ท = 0.222 pu 15 ๏จ 13.8 ๏ธ 176 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. The reactance diagram is shown below; Switch SW simulates the short circuit, and Eg๏ข๏ข and Em๏ข๏ข are the machine prefault internal voltages. Choose VF to be equal to the voltage at the fault point prior to the occurrence of the fault; then VF = Em๏ข๏ข = Eg๏ข๏ข ; prefault currents are neglected; I F๏ข๏ข 2 = 0; so VF may be open circuited as shown below: Equivalent impedance between Neglecting prefault currents, terminals a & b is Eg๏ข๏ข = Em๏ข๏ข = VF = 1๏0๏ฐ pu j 0.15 ๏ด j 0.736 = j 0.1246 j 0.15 + j 0.736 ๏ I F๏ข๏ข = I F๏ข๏ข1 = 1๏0๏ฐ = − j8.025pu j 0.1246 177 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 8.18 (A) (a) (b) I F๏ข๏ข 2 = VF 1.0๏0๏ฐ = = − j8.333per unit Z 22 j 0.12 Using Eq (8.4.7): ๏ฆ Z ๏ถ ๏ฆ 0.08 ๏ถ E1 = ๏ง1 − 12 ๏ท VF = ๏ง1 − ๏ท1.0๏0๏ฐ = 0.3333๏0๏ฐ per unit Z 22 ๏ธ ๏จ 0.12 ๏ธ ๏จ ๏ฆ Z ๏ถ E2 = ๏ง1 − 22 ๏ท VF = 0 Z 22 ๏ธ ๏จ ๏ฆ Z ๏ถ ๏ฆ 0.06 ๏ถ E3 = ๏ง 1 − 23 ๏ท VF = ๏ง 1 − ๏ท1.0๏0๏ฐ = 0.50๏0๏ฐ per unit Z 22 ๏ธ ๏จ 0.12 ๏ธ ๏จ (B) (a) 178 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (b) I F๏ข๏ข2 = VF Z 22 = 1.0๏0๏ฐ j 0.8 = − j1.25 pu Using Eq (8.4.7) ๏ฆ Z ๏ถ 0.1 ๏ถ ๏ฆ E1 = ๏ง 1 − 12 ๏ท VF = ๏ง 1. − (1๏0๏ฐ ) = 0.875 ๏0๏ฐ pu Z 22 ๏ธ 0.8 ๏ท๏ธ ๏จ ๏จ ๏ฆ Z ๏ถ E2 = ๏ง 1 − 22 ๏ท VF = 0 Z 33 ๏ธ ๏จ ๏ฆ Z ๏ถ ๏ฆ 0.5 ๏ถ E3 = ๏ง 1 − 23 ๏ท VF = ๏ง 1 − ๏ท1๏0๏ฐ = 0.375 ๏0๏ฐ pu Z33 ๏ธ ๏จ 0.8 ๏ธ ๏จ 8.19 ๏ฉ6.5625 ๏ช −5 YBUS = − j ๏ช ๏ช 0 ๏ช ๏ซ 0 −5 0 0 ๏น 15 −5 −5 ๏บ๏บ per unit −5 8.7037 0 ๏บ ๏บ −5 0 7.6786 ๏ป Using the personal computer subroutine ๏ฉ0.2671 ๏ช0.1505 Z bus = j ๏ช ๏ช0.0865 ๏ช ๏ช๏ซ0.098 8.20 0.1505 0.0865 0.098 ๏น 0.1975 0.1135 0.1286 ๏บ๏บ per unit 0.1135 0.1801 0.0739 ๏บ ๏บ 0.1286 0.0739 0.214 ๏บ๏ป −5 0 0 0 ๏น ๏ฉ6.7361 ๏ช −5 9.7619 −4.7619 0 0 ๏บ๏บ ๏ช Ybus = − j ๏ช 0 −4.7619 9.5238 −4.7619 0 ๏บ per unit ๏ช ๏บ 0 −4.7619 14.7619 −10 ๏บ ๏ช 0 ๏ช๏ซ 0 0 0 −10 15 ๏บ๏ป Using the personal computer subroutine ๏ฉ0.3542 ๏ช0.2772 ๏ช Z bus = j ๏ช0.1964 ๏ช ๏ช0.1155 ๏ช๏ซ0.077 0.2772 0.1964 0.1155 0.077 ๏น 0.3735 0.2645 0.1556 0.1037 ๏บ๏บ 0.2645 0.3361 0.1977 0.1318 ๏บ per unit ๏บ 0.1556 0.1977 0.2398 0.1599 ๏บ 0.1037 0.1318 0.1599 0.1733 ๏บ๏ป 179 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 8.21 (a) The admittance diagram is shown below: (b) Y11 = − j 0.5 − j 5 − j 5 = − j10.5;Y22 = − j 0.5 − j 2.5 − j 5 = − j8.0 Y33 = − j 0.5 − j 5 − j10 − j 2.5 = − j18.0;Y44 = − j 5 − j10 − j 5 = − j 20.0 Y12 = Y21 = 0; Y13 = Y31 = j 5.0; Y14 = Y41 = j 5.0 Y23 = Y32 = j 2.5; Y24 = Y42 = j 5; Y34 = Y43 = j10.0 Hence the bus admittance matrix is given by 0 j 5.0 j 5.0 ๏น ๏ฉ − j10.5 ๏ช 0 − j8.0 j 2.5 j 5.0 ๏บ๏บ ๏ช YBUS = ๏ช j 5.0 j 2.5 − j18.0 j10.0 ๏บ ๏ช ๏บ j 5.0 j10.0 − j 20.0 ๏บ๏ป ๏ช๏ซ j 5.0 −1 (c) The bus impedance matrix Z BUS = YBUS is given by ๏ฉ j 0.724 ๏ช j 0.620 Z BUS = ๏ช ๏ช j 0.656 ๏ช ๏ซ๏ช j 0.644 (1) j 0.620 j 0.656 j 0.738 j 0.642 j 0.642 j 0.702 j 0.660 j 0.676 j 0.644 ๏น j 0.660 ๏บ๏บ j 0.676 ๏บ ๏บ j 0.719๏ป๏บ (2) (3) (4) (1) ๏ฉ j1.5 − j 0.25 0 0 ๏น ๏ช (2) ๏ช − j 0.25 j 0.775 − j 0.4 − j 0.125๏บ๏บ 8.22 (a) YBUS = (3) ๏ช 0 − j 0.4 j1.85 − j 0.2 ๏บ ๏ช ๏บ (4) ๏ซ๏ช 0 − j 0.125 − j 0.2 j 0.325 ๏ป๏บ (1) (1) ๏ฉ j 0.71660 (2) ๏ช๏ช j 0.60992 (b) Z BUS = (3) ๏ช j 0.53340 ๏ช (4) ๏ช๏ซ j 0.58049 (2) (3) (4) j 0.60992 j 0.53340 j 0.73190 j 0.64008 j 0.64008 j 0.71660 j 0.69659 j 0.66951 j 0.58049 ๏น j 0.69659 ๏บ๏บ j 0.66951 ๏บ ๏บ j 0.76310 ๏บ๏ป 180 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Note: Z BUS may be formulated directly (instead of inverting YBUS ) by adding the branches in the order of their labels; and numbered subscripts on Z BUS will indicate the intermediate steps of the solution. For details of this step-by-step method of formulating Z BUS , please refer to the 2nd edition of the text. 8.23 (a) I ๏ข๏ขf = 1.0 1.0 = = − j 4.348 pu ๏ฌ Due to the fault Z 22 j 0.23 Note: Because load currents are neglected, the prefault voltage at each bus is 1.0๏0๏ฐ pu , the same as V f at bus 2. (b) Voltages during the fault are calculated below: j 0.2 ๏น ๏ฉ ๏ช 1 − j 0.23 ๏บ ๏บ ๏ฉ 0.134 ๏น ๏ฉV1 ๏น ๏ช ๏บ ๏ช 0 ๏ช ๏บ ๏ช ๏บ ๏บ = ๏ช 0 ๏บ pu ๏ฌ ๏ชV2 ๏บ = ๏ช j 0.15 ๏บ ๏ชV3 ๏บ ๏ช 1 − ๏ช0.3478 ๏บ j 0.23 ๏บ ๏ช ๏ช ๏บ ๏ช ๏บ ๏บ ๏ช๏ซ 0.3435๏บ๏ป ๏ช๏ซV4 ๏บ๏ป ๏ช ๏ช1 − j 0.151 ๏บ ๏ช๏ซ j 0.23 ๏บ๏ป (c) Current flow in line 3-1 is I 31 = V3 − V1 0.3478 − 0.1304 = = − j 0.8696 pu ๏ฌ Z 3−1 j 0.25 (d) Fault currents contributed to bus 2 by the adjacent unfaulted buses are calculated below: From Bus 1: V1 0.1304 = = − j1.0432 ๏ฌ Z 2 −1 j 0.125 From Bus 3: V3 0.3478 = = − j1.3912 ๏ฌ Z 2 −3 j 0.25 From Bus 4: V4 0.3435 = = − j1.7175 ๏ฌ Z2−4 j 0.2 Sum of these current contributions = −j4.1519 Which is approximately same as I ๏ข๏ขf . 181 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 8.24 For a fault at bus 3, generator 5 supplies 0.789 per unit current, generator 6 supplies 1.154 pu, and generator 7 supplies 2.625 pu. The per unit fault-on voltages are bus 1 = 0.546, bus 2 = 0.388, bus 3 = 0, bus 4 = 0.619, bus 5 = 0.735, bus 6 = 0.773, and bus 7 = 0.263. 8.25 For a fault at bus 4, generator 5 supplies 0.795 per unit current, generator 6 supplies 2.813 pu, and generator 7 supplies 1.114 pu. The per unit fault-on voltages are bus 1 = 0.541, bus 2 = 0.382, bus 3 = 0.605, bus 4 = 0, bus 5 = 0.732, bus 6 = 0.375, and bus 7 = 0.716. 8.26 For a fault midway on the line between buses 2 and 3, generator 5 supplies 0.966 per unit current, generator 6 supplies 1.416 pu, and generator 7 supplies 2.100 pu. The per unit fault-on voltages are bus 1 = 0.432, bus 2 = 0.238, bus 3 = 0.210, bus 4 = 0.521, bus 5 = 0.663, bus 6 = 0.710, and bus 7 = 0.420. 8.27 Generator G2 (at bus 6) supplies the most fault current for a bus 6 fault, during which it supplies 4.375 per unit fault current. This value can be limited to 2.5 per unit by increasing the G3 positive sequence impedance from 0.24 to 1.05/2.5 = 0.42, which would require an addition of 0.18 per unit reactance. 8.28 For a three phase fault at POPULAR69, the generators supply the following per unit fault currents: REDUBUD69 = 0.000 (off-line), ELM345 G1 = 1.971, ELM345, G2=1.971, SLACK345 = 3.198, PEACH69 = 3.000, CEDAR69 = 0.000 (off-line), BIRCH69 = 0.952, PEAR138 = 2.871, PEAR69 = 2.871. During the fault a total of 5 of the 37 buses have voltages at or below 0.75 per unit (one bus has a voltage of 0.75324 so some students may round this to 0.75 and say 6 buses are at or BELOW 0.75). 8.29 For a three phase fault at bus REDBUD69 the generators supply the following per unit fault currents: REDBUD69 = 0.000 (off-line), ELM345 G1 = 1.939, ELM345 G2 = 1.939, SLACK345 = 3.010, PEACH69 = 2.907, CEDAR69 = 0.000 (off-line), BIRCH69 = 1.626, PEAR138 = 3.152, PEAR69 = 2.228. During the fault a total of 5 of the 37 buses have voltages at or below 0.75 per unit. 8.30 With the line connecting buses 4 and 5 open in the Example 7.5 case, the generator at bus 3 supplies 7.925 per unit fault current. 8.31 (a) The symmetrical interrupting capability is: ๏ฆ 15.5 ๏ถ at 10 kV: ( 9.0 ) ๏ง ๏ท = 13.95 kA ๏จ 10 ๏ธ Vmin = Vmax 15.5 = = 6.20 kV k 2.50 at 5kV: I max = k ๏ฑ = ( 2.50 )( 9.0 ) = 22.5kA (b) The symmetrical interrupting capability at 13.8 kV is: 182 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฆ 15.5 ๏ถ 9.0 ๏ง ๏ท = 10.11kA ๏จ 13.8 ๏ธ Since the interrupting capability of 10.11 kA is greater than the 10 kA symmetrical fault current and the (X/R) ratio is less than 15, the answer is yes. This breaker can be safely installed at the bus. 8.32 From Table 8.10, select the 345 kV (nominal voltage class) breaker with a 40 kA rated short circuit current. This breaker has a 3 kA rated continuous current. 8.33 The maximum symmetrical interrupting capability is k ๏ด rated short-circuit current 1.25 ๏ด 19,000 = 23,750 A which must not be exceeded. Rated maximum voltage K 72.5 = = 58kV 1.25 Lower limit of operating voltage = Hence, in the operating voltage range 72.5–58 kV, the symmetrical interrupting current may exceed the rated short-circuit current of 19,000 A, but is limited to 23,750 A. For example, at 66 kV the interrupting current can be 72.5 ๏ด 19,000 = 20,871A 66 8.34 (a) For a base of 25 MVA, 13.8 kV in the generator circuit, the base for motors is 25 MVA, 6.9 kV. For each of the motors, X d๏ข๏ข = 0.2 25000 = 1.0 pu 5000 The reactance diagram is shown below: For a fault at P, VF = 1๏0๏ฐ pu; ZTh = j 0.125pu I ๏ข๏ขf = 1๏0๏ฐ j 0.125 = − j8.0 pu The base current in the 6.9 kV circuit is 25000 3 ๏ด 6.9 = 2090 A so, subtransient fault current = 8 ๏ด 2090 = 16,720A 183 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (b) Contributions from the generator and three of the four motors come through breaker A. The generator contributes a current of − j8.0 ๏ด 0.25 = − j 4.0 pu 0.50 Each motor contributes 25% of the remaining fault current, or − j1.0 pu amperes each. For breaker A I ๏ข๏ข = − j 4.0 + 3 ( − j1.0 ) = − j 7.0 pu or 7 ๏ด 2090 = 14,630 A (c) To compute the current to be interrupted by breaker A, let us replace the sub transient reactance of j1.0 by the transient reactance, say j1.5, in the motor circuit. Then Z Th = j 0.375 ๏ด 0.25 = j 0.15pu 0.375 + 0.25 The generator contributes a current of 1.0 0.375 ๏ด = − j 4.0 pu j 0.15 0.625 Each motor contributes a current of 1 1 0.25 ๏ด ๏ด = − j 0.67 pu 4 j 0.15 0.625 The symmetrical short-circuit current to be interrupted is ( 4.0 + 3 ๏ด 0.67 ) ๏ด 2090 = 12,560 A Supposing that all the breakers connected to the bus are rated on the basis of the current into a fault on the bus, the short-circuit current interrupting rating of the breakers connected to the 6.9 kV bus must be at least 4 + 4 ๏ด 0.67 = 6.67pu, or 6.67 ๏ด 2090 = 13,940 A . A 14.4-kV circuit breaker has a rated maximum voltage of 15.5kV and a k of 2.67. At 15.5kV its rated short-circuits interrupting current is 8900 A. This breaker is rated for a symmetrical short-circuit interrupting current of 2.67 ๏ด 8900 = 23,760A , at a voltage of 15.5 / 2.67 = 5.8 kV . This current is the maximum that can be interrupted even though the breaker may be in a circuit of lower voltage. The short-circuit interrupting current rating at 6.9 kV is 15.5 ๏ด 8900 = 20,000 A 6.9 The required capability of 13,940 A is well below 80% of 20,000 A, and the breaker is suitable with respect to short-circuit current. 184 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Chapter 9 Symmetrical Components 9.1 Using the identities shown in Table 9.1 (a) a −1 −(1 − a) (−1) 3 ๏ − 30๏ฐ 3 = = = ๏ 90๏ฐ 2 2 2 1+ a − a (1 + a + a ) − 2a (−1) 2 ๏ 240๏ฐ 2 (b) ( a 2 − a ) + j = −1 + j = ja + a 2 a( j + a) = 2๏135๏ฐ ๏ฆ 1 3๏ถ (1๏120๏ฐ ) ๏ง๏ง j − + j ๏ท๏ท 2 2 ๏ธ ๏จ 2๏15๏ฐ 2๏15๏ฐ = = 0.7321 ๏ 270๏ฐ ๏ฆ 3 ๏ถ 1.932 ๏ 105๏ฐ 1 − + j ๏ง๏ง + 1 ๏ท๏ท 2 ๏จ 2 ๏ธ (c) (1 + a ) (1 + a2 ) = ( −a2 ) ( −a ) = a3 = 1 ๏ 0๏ฐ (d) ( a − a 2 )( a 2 − 1) = ( a 2 − a )(1 − a 2 ) = ( 3๏270๏ฐ )( 3๏30๏ฐ ) = 3 ๏ 300๏ฐ ๐ (e) − ๐ = (1∠180°)(1∠90°)(1∠ − 120°) = 1∠150° 9.2 1 2 3 2 (a) ( a ) = a ( a3 ) = a = − + j (b) ( ja ) = ( j ) ( a ) = ( j ) ( j ) ( j ) ( a ) = −a = (c) (1 − a ) = ( 3๏ − 30๏ฐ ) = ( 3 ) ๏ − 90๏ฐ = 0 − j3 3 3 10 10 10 10 4 4 3 3 2 1 3 −j 2 2 3 = 0 − j 5.196 1 3 2 1 3 radians 2 = 0.6065๏49.62๏ฐ = 0.3929 + j 0.4620 − (d) ea = e 2 (e) ๐ 10 −( ) ๐ +j − = e 2๏ ๐ 10 (−1)5 ๐ ๐ = − 10 = − = 1 ๐ 1 √3 2 2 = ๐2 = − − ๐ 185 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 9.3 (a) ๏ฉI 0 ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช ๏ชI1 ๏บ = 1 ๏ช1 a ๏ช๏ซI 2 ๏บ๏ป 3 ๏ช๏ซ1 a 2 1 ๏น ๏ฉ 6 ๏ 90 ๏ฐ ๏น ๏ฉ1 ๏90 ๏ฐ + 1 ๏ 320 ๏ฐ + 1๏220 ๏ฐ ๏น ๏บ 6 2๏บ ๏ช a ๏บ ๏ช6 ๏ 320 ๏ฐ๏บ = ๏ช๏ช1 ๏90 ๏ฐ + 1 ๏80 ๏ฐ + 1 ๏100 ๏ฐ ๏บ๏บ 3 ๏ช๏ซ1 ๏ 90 ๏ฐ + 1 ๏200 ๏ฐ + 1 ๏ 340 ๏ฐ๏บ๏ป a ๏บ๏ป ๏ช๏ซ6 ๏ 220 ๏ฐ๏บ๏ป ๏ฉ0 − j 0.2856๏น ๏ฉ0.571 ๏ − 90 ๏ฐ๏น 6 ๏ช๏ช 0 + j 2.97 ๏บ๏บ = ๏ช๏ช 5.94 ๏ 90 ๏ฐ ๏บ๏บ A = 3 ๏ช๏ซ 0 + j 0.316 ๏บ๏ป ๏ช๏ซ 0.632 ๏ 90 ๏ฐ ๏บ๏ป (b) ๏ฉI 0 ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช ๏ชI1 ๏บ = 1 ๏ช1 a ๏ช๏ซI 2 ๏บ๏ป 3 ๏ช๏ซ1 a 2 9.4 ๏ฉVan ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ชVbn ๏บ = ๏ช1 a ๏ช๏ซVcn ๏บ๏ป ๏ช๏ซ1 a 1 ๏น ๏ฉ40 ๏ 90 ๏ฐ๏น ๏ฉ 1 ๏ 90 ๏ฐ + 1 ๏ 0 ๏ฐ ๏น ๏ฉ 18.86 ๏ 45 ๏ฐ ๏น ๏บ 2๏บ ๏ช a ๏บ ๏ช 40 ๏ 0 ๏ฐ ๏บ 40 ๏ช๏ช1 ๏90 ๏ฐ + 1๏120 ๏ฐ ๏บ๏บ = ๏ช๏ช25.76 ๏ 105 ๏ฐ๏บ๏บ A = a ๏บ๏ป ๏ช๏ซ 0 ๏บ๏ป 3 ๏ช๏ซ1 ๏ 90 ๏ฐ + 1๏240 ๏ฐ๏บ๏ป ๏ช๏ซ 6.90 ๏ 165 ๏ฐ ๏บ๏ป 1 ๏น ๏ฉ45 ๏ 80 ๏ฐ๏น ๏ฉ1 ๏80 ๏ฐ + 2 ๏ 0 ๏ฐ + 1 ๏90 ๏ฐ ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช 90 ๏ 0 ๏ฐ ๏บ = 45 ๏ช1 ๏ 80 ๏ฐ + 2 ๏ 240 ๏ฐ + 1 ๏210 ๏ฐ๏บ๏บ ๏ช๏ซ1 ๏ 80 ๏ฐ + 2 ๏120 ๏ฐ + 1 ๏330 ๏ฐ ๏บ๏ป a 2 ๏บ๏ป ๏ช๏ซ45 ๏ 90 ๏ฐ๏บ๏ป ๏ฉ 2.174 + j1.985 ๏น ๏ฉ 132.48๏ 42.4 ๏ฐ๏น = 45 ๏ช๏ช− 1.692 − j1.247๏บ๏บ = ๏ช๏ช94.58 ๏ 216.4 ๏ฐ๏บ๏บ V ๏ช๏ซ0.0397 + j 2.217๏บ๏ป ๏ช๏ซ99.78 ๏ 88.97 ๏ฐ๏บ๏ป 9.5 Eq 9.1.12 of text: 1 1 ๐ผ0ฬ = (๐ผ๐ฬ + ๐ผ๐ฬ + ๐ผ๐ฬ ) = (9∠0° + 8∠ − 90° + 6∠150°) = 1.268 − ๐1.667 3 3 = 2.094∠ − 52.74° A 1 1 ๐ผ1ฬ = (๐ผ๐ฬ + ๐๐ผ๐ฬ + ๐2 ๐ผ๐ฬ ) = (9∠0° + (1∠120°)8∠ − 90° + (1∠ − 120°)6∠150°) 3 3 = 7.04 − ๐2.33 = 7.42∠18.33° A 1 1 ๐ผ2ฬ = (๐ผ๐ฬ + ๐2 ๐ผ๐ฬ + ๐๐ผ๐ฬ ) = (9∠0° + (1∠ − 120°)8∠ − 90° + (1∠120°)6∠150°) 3 3 = 0.691 − ๐0.667 = 0.960∠ − 43.99° A 9.6 (a) Eq. (9.1.9) of text: Va = (V0 + V1 + V2 ) = (10๏0๏ฐ + 80๏30๏ฐ + 40๏ − 30๏ฐ ) = 114 + j 20 = 116๏9.9๏ฐ V ๏ฌ Vb = V0 + a 2V1 + aV2 = ๏ฉ๏ซ10๏0๏ฐ + 1๏240๏ฐ ( 80๏30๏ฐ ) + 1๏120๏ฐ ( 40๏ − 30๏ฐ ) ๏น๏ป = (10๏0๏ฐ + 80๏ − 90๏ฐ + 40๏90๏ฐ ) = 10 − j 40 = 41.3๏ − 76๏ฐ ๏ฌ 186 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Vc = V0 + aV1 + a 2V2 = ๏ฉ๏ซ10๏0๏ฐ + 1๏120๏ฐ ( 80๏30๏ฐ ) + 1๏240๏ฐ ( 40๏ − 30๏ฐ ) ๏น๏ป = (10๏0๏ฐ + 80๏150๏ฐ + 40๏ − 150๏ฐ ) = −94 + j 20 = 96.1๏168๏ฐ ๏ฌ (b) Vab = Va − Vb = (114 + j 20 ) − (10 − j 40 ) = 104 + j 60 = 120๏30๏ฐ V ๏ฌ Vbc = Vb − Vc = (10 − j 40 ) − ( −94 + j 20 ) = 104 − j60 = 120๏ − 30๏ฐ V ๏ฌ Vca = Vc − Va = ( −94 + j 20 ) − (114 + j 20 ) = −208 + j 0 = 208๏180๏ฐ V ๏ฌ (V ) = 13 (V + V + V ) = 13 (120๏30๏ฐ + 120๏ − 30๏ฐ + 208๏180๏ฐ ) = 0 ๏ฌ ab 0 ab bc ca ๏ฉ120๏30๏ฐ + 1๏120๏ฐ (120๏ − 30๏ฐ ) ๏น ๏บ +1๏240๏ฐ ( 208๏180๏ฐ ) ๏ป๏บ ๏ซ๏ช (V ) = 13 (V + aV + a V ) = 13 ๏ช ab 1 ab = 2 bc ca 1 (120๏30๏ฐ + 120๏90๏ฐ + 208๏60๏ฐ ) = 69.33 + j120 = 138.6๏60๏ฐ V ๏ฌ 3 ๏ฉ120๏30๏ฐ + 1๏240๏ฐ (120๏ − 30๏ฐ ) ๏น ๏บ +1๏120๏ฐ ( 208๏180๏ฐ ) ๏บ๏ป ๏ช๏ซ (V ) = 13 (V + a V + a (V ) ) = 13 ๏ช ab 2 ab = 2 bc ca 1 (120๏30๏ฐ + 120๏210๏ฐ + 208๏ − 60๏ฐ ) = 34.67 − j60 = 69.3๏ − 60๏ฐ V ๏ฌ 3 Since (Vab )0 = Va 0 − Vb 0 = 0 And (Vab )1 = Va1 − Vb1 ; (Vab )2 = Va 2 − Vb 2 , we have VL − L 0 = 0; VL − L 1 = ( 3๏30°)V ; V 1 L −L 2 = ( 3๏ − 30°)V 2 ๏ฆ 1 ๏ถ ๏ฆ 1 ๏ถ ๏ − 30๏ฐ ๏ท VL1 and V2 = ๏ง ๏30๏ฐ ๏ท VL 2 Or V1 = ๏ง ๏จ 3 ๏ธ ๏จ 3 ๏ธ Applying the above, one gets ๏ฆ 1 ๏ถ V1 = ๏ง ๏ − 30๏ฐ ๏ท (138.6๏60๏ฐ ) = 80๏30๏ฐ = 69.3 + j 40 ๏ฌ ๏จ 3 ๏ธ ๏ฆ 1 ๏ถ V2 = ๏ง ๏30๏ฐ ๏ท ( 69.3๏ − 60๏ฐ ) = 40๏ − 30๏ฐ = 34.6 − j 20 ๏ฌ ๏จ 3 ๏ธ 187 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Phase voltages are then given by Va = V1 + V2 = 103.9 + j 20 = 105.9๏10.9๏ฐ V ๏ฌ Vb = a 2V1 + aV2 = 1๏240๏ฐ ( 80๏30๏ฐ ) + 1๏120๏ฐ ( 40๏ − 30๏ฐ ) = ( 80๏ − 90๏ฐ + 40๏90๏ฐ ) = − j 40 = 40๏ − 90๏ฐ V ๏ฌ Vc = aV1 + a 2V2 = 1๏120๏ฐ (80๏30๏ฐ ) + 1๏240๏ฐ ( 40๏ − 30๏ฐ ) = 80๏150๏ฐ + 40๏210๏ฐ = −104 + j 20 = 105.9๏169๏ฐ V ๏ฌ The above are not the same as in part (a) ๏ฌ However, either set will result in the same line voltages. Note that the zero-sequence line voltage is always zero, even though zero-sequence phase voltage may exist. So it is not possible to construct the complete set of symmetrical components of phase voltages even when the unbalanced system of line voltages is known. But we can obtain a set with no zerosequence voltage to represent the unbalanced system. 9.7 ๐ผ0ฬ 1 1 1 [๐ผ1ฬ ] = [1 ๐ 3 1 ๐2 ๐ผ2ฬ 1 0 500∠90° 1500 1∠150° + 1∠30° [1∠270° + 1∠270°] = [1000∠270°] A ๐2 ] [1500∠150°] = 3 ๐ 1500∠30° 1∠30° + 1∠150° 500∠90° Current to ground, ๐ผ๐ฬ = 3๐ผ0ฬ = 1500∠90° A 9.8 Vab = Va − Vb ; Vbc = Vb − Vc ; Vca = Vc − Va Vab + Vbc + Vca = 0, Vab 0 = Vbc 0 = Vca 0 = 0 Choosing Vab as the reference, 1 (Vab + aVbc + a 2Vca ) 3 1 = (Va − Vb ) + a (Vb − Vc ) + a 2 (Vc − Va ) 3 1 = ๏ฉ๏ซ(Va + aVb + a 2Vc ) − ( a 2Va + Vb + aVc ) ๏น๏ป 3 1 = ๏ฉ๏ซ(Va + aVb + a 2Vc ) − a 2 (Va + aVb + a 2Vc ) ๏น๏ป 3 1 = ๏ฉ๏ซ(1 − a 2 ) (Va + aVb + a 2Vc ) ๏น๏ป = (1 − a 2 ) Va1 3 Vab1 = ( ) = 3 Va1 e j 30๏ฐ ๏ฌ 188 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 1 (Vab + a 2Vbc + aVca ) 3 1 = (Va − Vb ) + a 2 (Vb − Vc ) + a (Vc − Va ) 3 1 = ๏ฉ๏ซ(Va + a 2Vb + aVc ) − ( aVa + Vb + a 2Vc ) ๏น๏ป 3 1 = ๏ฉ๏ซ(Va + a 2Vb + aVc ) − a (Va + a 2Vb + aVc ) ๏น๏ป 3 1 = ๏ฉ๏ซ(1 − a ) (Va + a 2Vb + aVc ) ๏น๏ป = (1 − a ) Va 2 3 Vab 2 = ( ) = 3 Va 2 e − j 30๏ฐ ๏ฌ 9.9 Choosing Vbc as reference and following similar steps as in Problem 9.8 solution, one can get Vbc 0 = 0; Vbc1 = 3Va1e − j 90๏ฐ = − j 3Va1 ; ๏ผ ๏ฏ ๏ฝ ๏ฌ j 90๏ฐ and Vbc 2 = 3Va 2 e = j 3Va 2 ๏ฏ ๏พ 9.10 (a) ๏ฉVLg 0 ๏น ๏ฉ1 1 ๏ช ๏บ 1๏ช ๏ชVLg1 ๏บ = ๏ช1 a ๏ช ๏บ 3 ๏ช๏ซ1 a 2 ๏ซ๏ชVLg 2 ๏ป๏บ 1 ๏น ๏ฉ280๏0๏ฐ ๏น 2๏บ๏ช a ๏บ ๏ช250๏ − 110๏ฐ ๏บ๏บ a ๏บ๏ป ๏ช๏ซ290๏130๏ฐ ๏บ๏ป ๏ฉ280๏0๏ฐ + 250๏ − 110๏ฐ + 290๏130๏ฐ ๏น ๏ฉ2.696 − j 4.257 ๏น 1๏ช ๏บ = ๏ช270.6 + j31.26 ๏บ = ๏ช280๏0๏ฐ + 250๏ 10๏ฐ + 290๏10๏ฐ ๏บ ๏ช ๏บ 3 ๏ช๏ซ280๏0๏ฐ + 250๏130๏ฐ + 290๏250๏ฐ ๏บ๏ป ๏ช๏ซ 6.706 − j 27 ๏บ๏ป ๏ฉ5.039 ๏ − 57.65๏ฐ๏น = ๏ช๏ช 272.4 ๏ 6.59๏ฐ ๏บ๏บ V ๏ช๏ซ 27.82๏ − 76.05๏ฐ ๏บ๏ป (b) ๏ฉVab ๏น ๏ฉVag − Vbg ๏น ๏ฉ280๏0๏ฐ − 250๏ − 110๏ฐ ๏น ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏ชVbc ๏บ = ๏ชVbg − Vcg ๏บ = ๏ช250๏ − 110๏ฐ − 290๏130๏ฐ ๏บ ๏ช๏ซVca ๏บ๏ป ๏ชV − V ๏บ ๏ช๏ซ290๏130๏ฐ − 280๏0๏ฐ ๏บ๏ป ๏ช๏ซ cg ag ๏บ ๏ป ๏ฉ 365.5 + j 234.9 ๏น ๏ฉ 434.5๏32.73๏ฐ ๏น = ๏ช๏ช 100.9 − j 457.1 ๏บ๏บ = ๏ช๏ช 468.1๏ − 77.55๏ฐ๏บ๏บ V ๏ช๏ซ −466.4 + j 222.2 ๏บ๏ป ๏ช๏ซ 516.6๏154.5๏ฐ ๏บ๏ป (c) ๏ฉVLL 0 ๏น ๏ฉ1 1 ๏ช ๏บ 1๏ช ๏ชVLL1 ๏บ = ๏ช1 a ๏ช๏ซVLL 2 ๏บ๏ป 3 ๏ช๏ซ1 a 2 1 ๏น ๏ฉ 434.5๏32.73๏ฐ ๏น a 2 ๏บ๏บ ๏ช๏ช 468.1๏ − 77.55๏ฐ๏บ๏บ a ๏บ๏ป ๏ช๏ซ 516.6๏154.5๏ฐ ๏บ๏ป 189 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฉ 434.5 ๏ 32.73๏ฐ + 468.1 ๏ − 77.55๏ฐ + 516.6 ๏154.5๏ฐ ๏น ๏ฉ 0 + j 0 ๏น 1๏ช ๏บ ๏ช = ๏ช 434.5 ๏ 32.73๏ฐ + 468.1 ๏ 42.55๏ฐ + 516.6 ๏ 34.5๏ฐ ๏บ = ๏ช378.9 + j 281.2 ๏บ๏บ 3 ๏ช๏ซ 434.5 ๏ 32.73๏ฐ + 468.1 ๏162.5๏ฐ ๏ + 516.6 ๏ 274.5๏ฐ ๏บ๏ป ๏ช๏ซ −13.46 − j 46.44 ๏บ๏ป ๏ฉ ๏น 0 0 ๏ฉ ๏น ๏ช ๏บ = ๏ช๏ช 471.8 ๏ 36.58๏ฐ ๏บ๏บ V = ๏ช 3 VLg1 ๏ + 30๏ฐ ๏บ ๏ช ๏บ ๏ช๏ซ 48.35 ๏ − 106.2๏ฐ๏บ๏ป ๏ช๏ซ 3VLg 2 ๏ − 30๏ฐ ๏บ๏ป 9.11 The circuit is shown below: 1 (10๏0๏ฐ + 10๏180๏ฐ + 0 ) = 0 3 1 I a1 = (10๏0๏ฐ + 10๏180๏ฐ + 120๏ฐ + 0 ) = 5 − j 2.89 = 5.78๏ − 30๏ฐ A 3 1 I a 2 = (10๏0๏ฐ + 10๏180๏ฐ + 240๏ฐ + 0 ) = 5 + j 2.89 = 5.78๏30๏ฐ A 3 Ia0 = Then I b 0 = I a 0 = 0 A; Ic0 = Ia0 = 0 A I b1 = a 2 I a1 = 5.78๏ − 150๏ฐ A; I c1 = aI a1 = 5.78๏90๏ฐ A I b 2 = aI a 2 = 5.78๏150๏ฐ A; I c 2 = a 2 I a 2 = 5.78๏ − 90๏ฐ A 9.12 Selecting a base of 2300 V and 500 kVA, each resistor has an impedance of 1๏0๏ฐ pu ; Vab = 0.8 ; Vbc = 1.2 ; Vca = 1.0 The symmetrical components of the line voltages are: Vab1 = Vab 2 = 1 ( 0.8๏82.8๏ฐ + 1.2๏120๏ฐ − 41.4๏ฐ + 1.0๏240๏ฐ + 180๏ฐ ) = 0.2792 + j 0.9453 3 = 0.9857๏73.6๏ฐ 1 ( 0.8๏82.8๏ฐ + 1.2๏240๏ฐ − 41.4๏ฐ + 1.0๏120๏ฐ + 180๏ฐ ) = −0.1790 − j0.1517 3 = 0.2346๏220.3๏ฐ (These are in pu on line-to-line voltage base.) Phase voltages in pu on the base of voltage to neutral are given by Van1 = 0.9857๏73.6๏ฐ − 30๏ฐ = 0.9857๏43.6๏ฐ Van 2 = 0.2346๏220.3๏ฐ + 30๏ฐ = 0.2346๏250.3๏ฐ [Note: An angle of 180๏ฐ is assigned to Vca ] Zero-sequence currents are not present due to the absence of a neutral connection. 190 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. I a1 = Va1 /1๏0๏ฐ = 0.9857๏43.6๏ฐ pu I a 2 = Va 2 /1๏0๏ฐ = 0.2346๏250.3๏ฐ pu The positive direction of current is from the supply toward the load. 9.13 (a) ๏ฉI ๏ 0 ๏น ๏ฉ1 1 ๏ชI ๏บ 1 ๏ช1 a ๏ช ๏1 ๏บ = ๏ช ๏ช๏ซI ๏ 2 ๏บ๏ป 3 ๏ช๏ซ1 a 2 1 ๏น ๏ฉ 10 ๏ 0 ๏ฐ ๏น a 2 ๏บ๏บ ๏ช๏ช12 ๏ − 90 ๏ฐ๏บ๏บ a ๏บ๏ป ๏ช๏ซ 15 ๏ 90 ๏ฐ ๏บ๏ป ๏ฉ10 ๏ 0 ๏ฐ + 12 ๏− 90 ๏ฐ + 15 ๏ 90 ๏ฐ ๏น ๏ฉ 3.333 + j1 ๏น ๏ฉ 3.48 ๏16.7 ๏ฐ ๏น 1๏ช = ๏ช 10 ๏ 0 ๏ฐ + 12 ๏ 30 ๏ฐ + 15 ๏ 330 ๏ฐ ๏บ๏บ = ๏ช๏ช11.13 − j0.5 ๏บ๏บ = ๏ช๏ช11.14 ๏− 2.58 ๏ฐ๏บ๏บ A 3 ๏ช๏ซ10 ๏ 0 ๏ฐ + 12 ๏150 ๏ฐ + 15 ๏ 210 ๏ฐ๏บ๏ป ๏ช๏ซ−4.46 − j0.5๏บ๏ป ๏ช๏ซ4.49 ๏− 173.6 ๏ฐ๏บ๏ป (b) ๏ฉI a ๏น ๏ฉI ab − I ca ๏น ๏ฉ 10 ๏ 0 ๏ฐ − 15 ๏ 90 ๏ฐ ๏น ๏ฉ 10 − j15 ๏น ๏ฉ 18.03 ๏ − 56.3 ๏ฐ ๏น ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏ชIb ๏บ = ๏ชIbc − I ab ๏บ = ๏ช 12 ๏ − 90 ๏ฐ − 10 ๏ 0 ๏ฐ ๏บ = ๏ช− 10 − j12๏บ = ๏ช15.62 ๏ − 129.81 ๏ฐ๏บ A ๏ช๏ซI c ๏บ๏ป ๏ช๏ซI ca − Ibc ๏บ๏ป ๏ช๏ซ15 ๏ 90 ๏ฐ − 12 ๏ − 90 ๏ฐ๏บ๏ป ๏ช๏ซ j 27 ๏บ๏ป ๏ช๏ซ ๏บ๏ป 27 ๏ 90 ๏ฐ (c) ๏ฉI L 0 ๏น ๏ฉ1 1 ๏ช ๏บ 1๏ช ๏ชI L1 ๏บ = ๏ช1 a ๏ช๏ซI L 2 ๏บ๏ป 3 ๏ช๏ซ1 a 2 1 ๏น ๏ฉ 18.03 ๏ − 56.3 ๏ฐ ๏น a 2 ๏บ๏บ ๏ช๏ช15.62 ๏ − 129.81 ๏ฐ๏บ๏บ ๏บ๏ป a ๏บ๏ป ๏ช๏ซ 27 ๏ 90 ๏ฐ ๏ฉ 18.03 ๏ − 56.3 ๏ฐ + 15.62 ๏ − 129.81 ๏ฐ + 27 ๏ 90 ๏ฐ ๏น 1๏ช = ๏ช 18.03 ๏ − 56.3 ๏ฐ + 15.62 ๏ − 9.81 ๏ฐ + 27 ๏330 ๏ฐ ๏บ๏บ 3 ๏ช๏ซ18.03 ๏ − 56.3 ๏ฐ + 15.62 ๏ − 249.81 ๏ฐ + 27 ๏ 210 ๏ฐ๏บ๏ป ๏ฉ0 ๏น ๏ฉ0 + j 0 ๏น ๏ฉ0 ๏น ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ = ๏ช16.26 − j10.39 ๏บ = ๏ช19.29 ๏ − 32.57 ๏ฐ ๏บ A = ๏ช 3 I ๏1 ๏ − 30 ๏ฐ ๏บ ๏ช ๏บ ๏ช๏ซ− 6.257 − j 4.61๏บ๏ป ๏ช๏ซ7.77 ๏ − 143.59 ๏ฐ๏บ๏ป ๏ซ 3 I ๏ 2 ๏ + 30 ๏ฐ๏ป 9.14 I0 = I1 = I2 = VLg 0 Z0 VLg1 Z1 VLg 2 Z2 = 5.039๏ − 57.65 ๏ฐ = 0.252 ๏ − 110.78 ๏ฐ A 20๏ 53.13 ๏ฐ = 272.4 ๏6.59 ๏ฐ = 13.62 ๏ − 46.54 ๏ฐ A 20 ๏ 53.13 ๏ฐ = 27.82 ๏ − 76.05 ๏ฐ = 1.391 ๏ − 129.18 ๏ฐ A 20 ๏ 53.13 ๏ฐ 191 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฉI a ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ชI b ๏บ = ๏ช1 a ๏ชI c ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ0.252 ๏ − 110.78 ๏ฐ๏น ๏บ๏ช ๏บ a ๏บ ๏ช 13.62 ๏ − 46.54 ๏ฐ ๏บ a 2 ๏บ๏ป ๏ช๏ซ1.391 ๏ −129.18 ๏ฐ ๏บ๏ป ๏ฉ0.2520 ๏ − 110.78 ๏ฐ + 13.62 ๏ − 46.54 ๏ฐ + 1.391๏ − 129.18 ๏ฐ๏น = ๏ช๏ช0.2520 ๏ − 110.78 ๏ฐ + 13.62 ๏193.46 ๏ฐ + 1.391 ๏ − 9.18 ๏ฐ ๏บ๏บ ๏ช๏ซ0.2520 ๏ − 110.78 ๏ฐ + 13.62 ๏ 73 .46 ๏ฐ + 1.391 ๏110.82 ๏ฐ ๏บ๏ป ๏ฉ 8.4 − j11.2 ๏น ๏ฉ 14 ๏ − 53.13 ๏ฐ ๏น ๏ช ๏บ ๏ช ๏บ = ๏ช− 11.96 − j3.628๏บ = ๏ช12.5 ๏ − 163.1 ๏ฐ๏บ A ๏ช๏ซ 3.294 + j14.12 ๏บ๏ป ๏ช๏ซ 14.5 ๏ 76.37 ๏ฐ ๏บ๏ป Note: The source and load neutrals are connected with a zero-ohm wire. ๏ฉI a ๏น ๏ฉVag zY ๏น ๏ฉ 280 ๏ 0 ๏ฐ 20 ๏ 53.13 ๏ฐ ๏น ๏ฉ 14 ๏ − 53.13 ๏ฐ ๏น ๏บ ๏ช ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏ชI b ๏บ = ๏ชVbg zY ๏บ = ๏ช250 ๏ − 110 ๏ฐ 20 ๏53.13 ๏ฐ๏บ = ๏ช12.5 ๏ − 163.1 ๏ฐ๏บ ๏ชI c ๏บ ๏ชV z ๏บ ๏ช๏ซ 290 ๏130 ๏ฐ 20 ๏53.13 ๏ฐ ๏บ๏ป ๏ช๏ซ 14.5 ๏76.87 ๏ฐ ๏บ๏ป ๏ซ ๏ป ๏ซ๏ช cg Y ๏ป๏บ Which agrees with the above result. 9.15 I 0 = 0 ; From Problem 9.14, I1 = 13.62๏ − 46.54๏ฐ A; I 2 = 1.391๏ − 129.18๏ฐ A ๏ฉ I a ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ช I b ๏บ = ๏ช1 a ๏ช I c ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น๏ฉ 0 ๏น ๏บ ๏ช a ๏บ ๏ช 13.62๏ − 46.54๏ฐ ๏บ๏บ a 2 ๏บ๏ป ๏ช๏ซ1.391๏ − 129.18๏ฐ๏บ๏ป ๏ฉ13.62๏ − 46.54๏ฐ + 1.391๏ − 129.18๏ฐ ๏น = ๏ช๏ช 13.62๏193.46๏ฐ + 1.391๏ − 9.18๏ฐ ๏บ๏บ ๏ช๏ซ 13.62๏73.46๏ฐ + 1.391๏110.82๏ฐ ๏บ๏ป ๏ฉ 8.49 − j10.96 ๏น ๏ฉ13.86๏ − 52.24๏ฐ๏น = ๏ช๏ช −11.87 − j 3.392 ๏บ๏บ = ๏ช๏ช12.35๏195.9๏ฐ ๏บ๏บ A ๏ช๏ซ 3.383 + j14.36 ๏บ๏ป ๏ช๏ซ14.75๏76.74๏ฐ ๏บ๏ป 192 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 9.16 272.4๏6.59๏ฐ = 40.86๏ − 46.54๏ฐ A ๏ฆ 20 ๏ถ ๏ 53.13 ๏ฐ ๏ง 3 ๏ท ๏จ ๏ธ 27.82๏ − 76.05๏ฐ I2 = = 4.173๏ − 129.18๏ฐ A ๏ฆ 20 ๏ถ ๏ง 3 ๏ท ๏53.13๏ฐ ๏จ ๏ธ I 0 = 0; I1 = ๏ฉ I a ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ช I b ๏บ = ๏ช1 a ๏ช I c ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ0 ๏น ๏ฉ 41.58๏ − 52.24๏ฐ๏น ๏บ ๏ช a ๏บ ๏ช 40.86๏ − 46.54๏ฐ ๏บ๏บ = ๏ช๏ช37.05๏195.9๏ฐ ๏บ๏บ A a 2 ๏บ๏ป ๏ช๏ซ 4.173๏ − 129.18๏ฐ๏บ๏ป ๏ช๏ซ 44.25๏76.74๏ฐ ๏บ๏ป Note: These currents are 3 times those in Problem 9.15. 9.17 I0 = I1 = I2 = VLg 0 Z0 VLg1 Z1 VLg 2 Z2 = 5.039๏ − 57.65๏ฐ = 0.4826๏ − 131๏ฐ A 3 + j10 = 272.4๏6.59๏ฐ = 36.54๏ − 19.98๏ฐ A 7.454๏26.57๏ฐ = 27.82๏ − 76.05๏ฐ = 3.732๏ − 102.72๏ฐ A 7.454๏26.57๏ฐ ๏ฉ I a ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ช I b ๏บ = ๏ช1 a ๏ช I c ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ0.4826๏ − 131๏ฐ ๏น a ๏บ๏บ ๏ช๏ช36.54๏ − 19.98๏ฐ ๏บ๏บ a 2 ๏บ๏ป ๏ช๏ซ3.732๏ − 102.72๏ฐ๏บ๏ป ๏ฉ0.4826๏ − 131๏ฐ + 36.54๏ − 19.98๏ฐ + 3.732๏ − 102.72๏ฐ ๏น = ๏ช๏ช 0.4826๏ − 131๏ฐ + 36.54๏220.02๏ฐ + 3.732๏17.28๏ฐ ๏บ๏บ ๏ช๏ซ 0.4826๏ − 131๏ฐ + 36.54๏100.02๏ฐ + 3.732๏137.28๏ฐ ๏บ๏ป ๏ฉ 33.2 − j16.49 ๏น ๏ฉ37.07๏ − 26.41๏ฐ๏น = ๏ช๏ช −24.74 − j 22.75๏บ๏บ = ๏ช๏ช33.61๏222.6๏ฐ ๏บ๏บ A ๏ช๏ซ −9.416 + j 38.15๏บ๏ป ๏ช๏ซ39.29๏103.9๏ฐ ๏บ๏ป 193 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 9.18 ๏ฉ Z0 ๏ชZ ๏ช 10 ๏ช๏ซ Z 20 Z 01 Z1 Z 21 Z 02 ๏น ๏ฉ1 1 ๏บ Z12 ๏บ 1 ๏ช๏ช1 a = Z 2 ๏บ๏ป 3 ๏ซ๏ช1 a 2 1๏น a 2 ๏บ๏บ a ๏บ๏ป ๏ฉ( Z aa + Z ab + Z ac ) ( Z aa + a 2 Z ab + aZ ac )( Z aa + aZ ab + a 2 Z ac ) ๏น ๏ช ๏บ 2 2 ๏ช ( Z ab + Z bb + Z bc ) ( Z ab + a Z bb + aZ bc )( Z ab + aZ bb + a Z bc ) ๏บ ๏ช ( Z ac + Z bc + Z cc ) ( Z ac + a 2 Z bc + aZ cc )( Z ac + aZ bc + a 2 Z cc ) ๏บ ๏ซ ๏ป ๏ฉ( Z aa + Z bb + Z cc ) + 2 ( Z ab + Z ac + Z bc ) 1๏ช = ๏ช( Z aa + aZ bb + a 2 Z cc ) + Z ab (1 + a ) + Z ac (1 + a 2 ) + Z bc ( a + a 2 ) 3 ๏ช( Z aa + a 2 Z bb + aZ cc ) + Z ab (1 + a 2 ) + Z ac (1 + a ) + Z bc ( a 2 + a ) ๏ซ ( Z aa + a 2 Z bb + aZ cc ) + Z ab ( a 2 + 1) + Z ac ( a + 1) + Z bc ( a + a 2 ) ( Z aa + a3 Z bb + a3 Z cc ) + Z ab ( a 2 + a ) + Z ac ( a + a 2 ) + Z bc ( a 2 + a 4 ) ( Z aa + a 4 Z bb + a 2 Z cc ) + Z ab ( a 2 + a 2 ) + Z ac ( 2a ) + Z bc ( a 2 + a 4 ) ( Z aa + aZ bb + a 2 Z cc ) + Z ab (1 + a ) + Z ac (1 + a 2 ) + Z bc ( a + a 2 ) ๏น ๏บ ( Z aa + a 2 Z bb + a 4 Z cc ) + Z ab ( 2a ) + Z ac ( 2a 2 ) + Z bc ( 2 ) ๏บ 3 3 2 2 2 ๏บ Z + a Z + a Z + Z a + a + Z a + a + Z a + a ( aa ) ac ( ) bc ( )๏ป bb cc ) ab ( ๏ฉ Z aa + Z bb + Z cc + 2 Z ab + 2 Z ac + 2 Z bc 1๏ช = ๏ช Z aa + aZ bb + a 2 Z cc − a 2 Z ab − aZ ac − Z bc 3 ๏ช๏ซ Z aa + a 2 Z bb + aZ cc − aZ ab − a 2 Z ac − Z bc Z aa + a 2 Z bb + aZ cc − aZ ab − a 2 Z ac − Z bc Z aa + Z bb + Z cc − Z ab − Z ac − Z bc Z aa + aZ bb + a 2 Z cc + 2 a 2 Z ab + 2 aZ ac + 2 Z bc Z aa + aZ bb + a 2 Z cc − a 2 Z ab − aZ ac − Z bc ๏น ๏บ Z aa + a Z bb + aZ cc + 2 aZ ab + 2 a Z ac + 2 Z bc ๏บ ๏บ๏ป Z aa + Z bb + Z cc − Z ab − Z ac − Z bc 2 2 9.19 (a) 194 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. writing KVL equations [see Eqs (9.2.1) – (9.2.3)]: Vag = Z y I a + Z n ( I a + I b + I c ) Vbg = Z y I b + Z n ( I a + I b + I c ) Vcg = Z y I c + Z n ( I a + I b + I c ) In matrix format [see Eq (9.2.4)] ๏ฉ( Z y + Z n ) ๏ช ๏ช Zn ๏ช ๏ช Zn ๏ซ ๏ฉ( 3 + j 5 ) ๏ช ๏ช j1 ๏ช j 1 ๏ซ ๏น ๏ฉV ๏น ๏บ ๏ฉ I a ๏น ๏ช ag ๏บ ๏ช ๏บ ๏บ I b = ๏ชVbg ๏บ Zn ๏บ๏ช ๏บ ๏ช ๏บ ( Z y + Z n )๏บ๏ป ๏ช๏ซ I c ๏บ๏ป ๏ซ๏ชVcg ๏ป๏บ Zn Zn (Z + Z ) y n Zn j1 ( 3 + j 5) j1 ๏ฉ I a ๏น ๏ฉ( 3 + j 5 ) ๏ช ๏บ ๏ช ๏ช I b ๏บ = ๏ช j1 ๏ช I c ๏บ ๏ช j1 ๏ซ ๏ป ๏ซ ๏น ๏ฉ I a ๏น ๏ฉ 100๏0๏ฐ ๏น ๏บ๏ช ๏บ j1 ๏บ ๏ช I b ๏บ = ๏ช๏ช75๏180๏ฐ๏บ๏บ ( 3 + j 5)๏บ๏ป ๏ช๏ซ I c ๏บ๏ป ๏ช๏ซ 50๏90๏ฐ ๏บ๏ป j1 j1 ( 3 + j5) j1 ๏น ๏บ j1 ๏บ ( 3 + j 5)๏บ๏ป j1 −1 ๏ฉ 100๏0๏ฐ ๏น ๏ช75๏180๏ฐ๏บ ๏ช ๏บ ๏ช๏ซ 50๏90๏ฐ ๏บ๏ป Performing the indicated matrix inverse (a computer solution is suggested): ๏ฉ I a ๏น ๏ฉ0.1763๏ − 56.50๏ฐ 0.02618๏150.2๏ฐ 0.02618๏150.2๏ฐ ๏น ๏ฉ 100๏0๏ฐ ๏น ๏ช ๏บ ๏ช ๏บ๏ช ๏บ ๏ช I b ๏บ = ๏ช 0.02618๏150.2๏ฐ 0.1763๏ − 56.50๏ฐ 0.02618๏150.2๏ฐ ๏บ ๏ช75๏180๏ฐ ๏บ ๏ช I c ๏บ ๏ช๏ซ 0.02618๏150.2๏ฐ 0.02618๏150.2๏ฐ 0.1763๏ − 56.50๏ฐ ๏บ๏ป ๏ช๏ซ 50๏90๏ฐ ๏บ๏ป ๏ซ ๏ป Finally, performing the indicated matrix multiplication: ๏ฉ I a ๏น ๏ฉ17.63๏ − 56.50๏ฐ + 1.964๏330.2๏ฐ + 1.309๏240.2๏ฐ ๏น ๏ช ๏บ ๏ช ๏บ ๏ช I b ๏บ = ๏ช2.618๏150.2๏ฐ + 13.22๏123.5๏ฐ + 1.309๏240.2๏ฐ ๏บ ๏ช I c ๏บ ๏ช๏ซ2.618๏150.2๏ฐ + 1.964๏330.2๏ฐ + 8.815๏33.5๏ฐ ๏บ๏ป ๏ซ ๏ป ๏ฉ I a ๏น ๏ฉ 10.78 − j16.81 ๏น ๏ฉ19.97๏ − 57.32๏ฐ๏น ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช I b ๏บ = ๏ช −10.22 + j11.19 ๏บ = ๏ช15.15๏132.4๏ฐ ๏บ A ๏ช I c ๏บ ๏ช๏ซ 6.783 + j 5.191 ๏บ๏ป ๏ช๏ซ8.541๏37.43๏ฐ ๏บ๏ป ๏ซ ๏ป 195 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (b) Step (1): Calculate the sequence components of the applied voltage: ๏ฉVg 0 ๏น ๏ฉ1 1 ๏ช ๏บ 1๏ช ๏ชVg1 ๏บ = ๏ช1 a ๏ช ๏บ 3 ๏ช1 a 2 ๏ซ ๏ซ๏ชVg 2 ๏ป๏บ 1 ๏น ๏ฉ 100๏0๏ฐ ๏น a 2 ๏บ๏บ = ๏ช๏ช 75๏180๏ฐ๏บ๏บ a ๏บ๏ป ๏ช๏ซ 50๏90๏ฐ ๏บ๏ป ๏ฉ 100๏0๏ฐ + 75๏180๏ฐ + 50๏90๏ฐ ๏น 1๏ช = ๏ช100๏0๏ฐ + 75๏300๏ฐ + 50๏330๏ฐ ๏บ๏บ 3 ๏ช๏ซ 100๏0๏ฐ + 75๏60๏ฐ + 50๏210๏ฐ ๏บ๏ป ๏ฉ8.333 + j16.667 ๏น ๏ฉ18.63๏63.43๏ฐ ๏น = ๏ช๏ช 60.27 − j 29.98 ๏บ๏บ = ๏ช๏ช67.32๏ − 26.45๏บ๏บ V ๏ช๏ซ 31.40 + j13.32 ๏บ๏ป ๏ช๏ซ34.11๏22.99๏ฐ ๏บ๏ป Step (2): Draw sequence networks: Step (3): Solve sequence networks I0 = Vg0 Z0 = Vg0 Z y + 3 Zn = 18.63๏63.43๏ฐ 18.63๏63.43๏ฐ = 3 + j7 7.616๏66.80๏ฐ I 0 = 2.446๏ − 3.37๏ฐ A I1 = I2 = Vg1 Z1 Vg 2 Z2 = 67.32๏ − 26.45๏ฐ 67.32๏ − 26.45๏ฐ = = 13.46๏ − 79.58 A 3 + j4 5๏53.13๏ฐ = 34.11๏22.99๏ฐ = 6.822๏ − 30.14๏ฐ 5๏53.13๏ฐ Step (4): Calculate the line currents (phase components): ๏ฉ I a ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ช I b ๏บ = ๏ช1 a ๏ช I c ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ 2.446๏ − 3.37๏ฐ ๏น a ๏บ๏บ ๏ช๏ช13.46๏ − 79.58๏ฐ ๏บ๏บ a 2 ๏บ๏ป ๏ช๏ซ6.822๏ − 30.14๏ฐ ๏บ๏ป ๏ฉ2.446๏ − 3.37๏ฐ + 13.46๏ − 79.58๏ฐ + 6.822๏ − 30.14๏ฐ ๏น = ๏ช๏ช2.446๏ − 3.37๏ฐ + 13.46๏160.42๏ฐ + 6.822๏89.86๏ฐ ๏บ๏บ ๏ช๏ซ2.446๏ − 3.37๏ฐ + 13.46๏40.42๏ฐ + 6.822๏209.86๏ฐ ๏บ๏ป ๏ฉ 10.78 − j16.81 ๏น ๏ฉ19.97๏ − 57.32๏ฐ ๏น = ๏ช๏ช −10.22 + j11.19 ๏บ๏บ = ๏ช๏ช15.15๏132.4๏ฐ ๏บ๏บ A ๏ช๏ซ 6.773 + j 5.187 ๏บ๏ป ๏ช๏ซ8.531๏37.45๏ฐ ๏บ๏ป 196 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 9.20 (a) The line-to-line voltages are related to the ๏ currents by ๏ฉVab ๏น ๏ฉ j 27 ๏ช ๏บ ๏ช ๏ชVbc ๏บ = ๏ช 0 ๏ชVca ๏บ ๏ช๏ซ 0 ๏ซ ๏ป 0 ๏น ๏ฉ I ab ๏น ๏ช ๏บ 0 ๏บ๏บ ๏ช I bc ๏บ j 27 ๏บ๏ป ๏ช๏ซ I ca ๏บ๏ป 0 j 27 0 Transforming to symmetrical components, ๏ฉVab 0 ๏น ๏ฉ j 27 ๏ช ๏บ A ๏ชVab1 ๏บ = ๏ช๏ช 0 ๏ช ๏บ ๏ช๏ซVab 2 ๏บ๏ป ๏ช๏ซ 0 0 j 27 0 0 ๏น ๏ฉ I ab 0 ๏น ๏ช ๏บ 0 ๏บ๏บ A ๏ช I ab1 ๏บ j 27 ๏บ๏ป ๏ช๏ช I a b 2 ๏บ๏บ ๏ซ ๏ป Premultiplying each side by A−1 , ๏ฉVab 0 ๏น ๏ฉ I ab 0 ๏น ๏ฉ j 27 ๏ช ๏บ ๏ช ๏บ ๏ช −1 ๏ชVab1 ๏บ = j 27 A A ๏ช I ab1 ๏บ = ๏ช 0 ๏ช ๏บ ๏ช ๏บ ๏ช๏ซVab 2 ๏บ๏ป ๏ช๏ซ I ab 2 ๏บ๏ป ๏ช๏ซ 0 0 j 27 0 0 ๏น ๏ฉ I ab 0 ๏น ๏ช ๏บ 0 ๏บ๏บ ๏ช I ab1 ๏บ j 27 ๏บ๏ป ๏ช๏ช I ab 2 ๏บ๏บ ๏ซ ๏ป As shown in Fig. 9.5 of the text, sequence networks for an equivalent Y representation of a balanced-๏ load are given below: (b) With a mutual impedance of (j6) ๏ between phases, ๏ฉVab 0 ๏น ๏ฉ j 27 ๏ช ๏บ A ๏ชVab1 ๏บ = ๏ช๏ช j 6 ๏ช ๏บ ๏ช j6 ๏ซ๏ชVab 2 ๏ป๏บ ๏ซ j6 j 27 j6 j 6 ๏น ๏ฉ I ab 0 ๏น ๏ช ๏บ j 6 ๏บ๏บ A ๏ช I ab1 ๏บ j 27 ๏บ๏ป ๏ช๏ช I ab 2 ๏บ๏บ ๏ซ ๏ป Rewriting the coefficient matrix into two parts, ๏ฉ j 27 ๏ช j6 ๏ช ๏ช๏ซ j 6 j6 j 27 j6 j6 ๏น ๏ฉ1 0 0 ๏น ๏ฉ1 1 1๏น ๏บ ๏ช ๏บ j 6 ๏บ = j 21 ๏ช0 1 0 ๏บ + j6 ๏ช๏ช1 1 1๏บ๏บ ๏ช๏ซ0 0 1 ๏บ๏ป ๏ช๏ซ1 1 1๏บ๏ป j 27 ๏บ๏ป 197 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. and substituting into the previous equation, ๏ฉVab 0 ๏น ๏ฌ ๏ฉ1 1 1๏น ๏ผ ๏ฉ I ab 0 ๏น ๏ช ๏บ ๏ฏ ๏บ ๏บ ๏ฏ๏ช −1 −1 ๏ช ๏ชVab1 ๏บ = ๏ญ j 21A A + jGA ๏ช1 1 1๏บ A ๏ฝ ๏ช I ab1 ๏บ ๏ช ๏บ ๏ฏ ๏ช๏ซ1 1 1๏บ๏ป ๏ฏ๏พ ๏ช๏ช I ๏บ๏บ ๏ช๏ซVab 2 ๏บ๏ป ๏ฎ ๏ซ ab 2 ๏ป ๏ฌ ๏ฉ j 21 ๏ฏ = ๏ญ ๏ช๏ช 0 ๏ฏ๏ช 0 ๏ฎ๏ซ ๏ฉ j 39 = ๏ช๏ช 0 ๏ช๏ซ 0 0 j 21 0 0 j 21 0 0 ๏น ๏ฉ 3 0 0 ๏น ๏ผ ๏ฉ I ab 0 ๏น ๏บ ๏ฏ๏ช ๏บ 0 ๏บ + j 6 ๏ช๏ช0 0 0 ๏บ๏บ ๏ฝ ๏ช I ab1 ๏บ ๏ช๏ซ 0 0 0 ๏บ๏ป ๏ฏ๏พ ๏ช๏ช I ๏บ๏บ j 21๏บ๏ป ๏ซ ab 2 ๏ป 0 ๏น ๏ฉ I ab 0 ๏น ๏ช ๏บ 0 ๏บ๏บ ๏ช I ab1 ๏บ j 21๏บ๏ป ๏ช๏ช I ab 2 ๏บ๏บ ๏ซ ๏ป Then the sequence networks are given by: 9.21 From Eq (9.2.28) and (9.2.29), the load is symmetrical. Using Eq. (9.2.31) and (9.2.32): ฬ = 3 + ๐7 ๐0ฬ = ๐ฬ ๐๐ 2 ๐๐๐ ฬ − ๐ฬ ๐๐ = 3 + ๐7 ๐1ฬ = ๐ฬ 2 = ๐๐๐ 3 + ๐7 ๐๐ = [ 0 0 0 0 3 + ๐7 0 ]Ω 0 3 + ๐7 9.22 Since Z s is diagonal, the load is symmetrical. Using Eq. (9.2.31) and (9.2.32): Z 0 = 6 + j10 = Z aa + 2 Z ab Z1 = 5 = Z aa − Z ab Solving the above two equations 1 1 1 10 ( 6 + j10 − 5) = (1 + j10 ) = + j ๏ 3 3 3 3 16 10 Z aa = Z ab + 5 = + j ๏ 3 3 Z aa = 198 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 10 1 10 1 10 ๏น ๏ฉ16 +j ๏บ ๏ช 3 + j 3 3+ j 3 3 3 ๏ช ๏บ 1 10 16 10 1 10 ๏บ ๏ช Zp = +j +j +j ๏ ๏ช3 3 3 3 3 3 ๏บ ๏ช ๏บ 1 10 16 10 ๏ช 1 + j 10 +j +j ๏บ 3 3 3 3 3 ๏ป๏บ ๏ซ๏ช 3 9.23 The line-to-ground voltages are Va = Z s I a + Z m I b + Z m I c + Z n I n Vb = Z m I a + Z s I b + Z m I c + Z n I n Vc = Z m I a + Z m I b + Z s I c + Z n I n Since I n = I a + I b + I c , it follows ๏ฉVa ๏น ๏ฉ Z s + Z n ๏ช ๏บ ๏ช ๏ชVb ๏บ = ๏ช Z m + Z n ๏ชVc ๏บ ๏ช Z m + Z n ๏ซ ๏ป ๏ซ Zm + Zn ๏น ๏ฉIa ๏น ๏บ๏ช ๏บ Zm + Zn ๏บ ๏ช Ib ๏บ Z s + Z n ๏บ๏ป ๏ช๏ซ I c ๏บ๏ป Zm + Zn Zs + Zn Zm + Zn phase impedance matrix Z p or in compact form Vp = Z p I p From Eq. (9.2.9) Z s = A−1 Z p A ๏ฉ1 1 1๏ช ๏ Z s = ๏ช1 a 3 ๏ช๏ซ1 a 2 1 ๏น ๏ฉ Zs + Zn ๏ช a 2 ๏บ๏บ ๏ช Z m + Z n a ๏บ๏ป ๏ช๏ซ Z m + Z n ๏ฉ Zs + 3 Zn + 2 Zm ๏ช =๏ช 0 ๏ช 0 ๏ซ Zm + Zn Zs + Zn Zm + Zn 0 Zs − Zm 0 Z m + Z n ๏น ๏ฉ1 1 ๏บ Z m + Z n ๏บ ๏ช๏ช1 a 2 Z s + Z n ๏บ๏ป ๏ช๏ซ1 a 1๏น a ๏บ๏บ a 2 ๏บ๏ป ๏น ๏บ 0 ๏บ Z s − Z m ๏บ๏ป 0 Sequence impedance matrix When there is no mutual coupling, Z m = 0 ๏ฉ Zs + 3 Zn ๏ช ๏ Zs = ๏ช 0 ๏ช 0 ๏ซ 0 Zs 0 0๏น ๏บ 0๏บ Z s ๏บ๏ป 199 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 9.24 (a) The circuit is shown below: KVL: ( j12 ) I a + ( j 4 ) I b − ( j12 ) I b − j 4 ( I a ) = Va − Vb = VLINE ๏30๏ฐ ( j12 ) I b + ( j 4 ) I c − ( j12 ) I c − ( j 4 ) I b = Vb − Vc = VLINE ๏ − 90๏ฐ KCL: I a + I b + I c = 0 In matrix form: ๏ฉ j12 − j 4 − ( j12 − j 4 ) ๏น ๏ฉ I a ๏น ๏ฉVL ๏30๏ฐ ๏น 0 ๏ช ( j12 − j 4 ) − ( j12 − j 4 )๏บ๏บ ๏ช๏ช I b ๏บ๏บ = ๏ช๏ชVL ๏90๏ฐ๏บ๏บ ๏ช 0 ๏ช 1 ๏บ ๏ช I c ๏บ ๏ช๏ซ 0 ๏บ๏ป 1 1 ๏ซ ๏ป๏ซ ๏ป where VL = 100 3 Solving for I a , I b , I c , one gets I a = 12.5๏ − 90๏ฐ; I b = 12.5๏150๏ฐ; I c = 12.5๏30๏ฐA (b) Using symmetrical components, ๏ฉ j12 + 2 ( j 4 ) ๏ฉ 0 ๏น ๏ช ๏ช ๏บ Vs = ๏ช100 ๏บ ; Z s = ๏ช 0 ๏ช ๏ช๏ซ 0 ๏บ๏ป 0 ๏ซ 0 ๏น ๏บ 0 ๏บ j12 − j 4 ๏บ๏ป 0 j12 − j 4 0 From the solution of Problem 9.18 upon substituting the values Is = Zs −1 ๏ฉ1 1 Vs and I p = A I s where A = ๏ช๏ช1 a 2 ๏ช๏ซ1 a 1๏น a ๏บ๏บ a 2 ๏บ๏ป which result in I a = 12.5๏ − 90๏ฐ; I b = 12.5๏150๏ฐ; I c = 12.5๏30๏ฐ A which is same as in (a) 200 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 9.25 (a) ๏ฉ1 1 Z s = A−1 Z p A; A = ๏ช๏ช1 a 2 ๏ช๏ซ1 a 1๏น ๏ฉ1 1 1 ๏บ a ๏บ ; A−1 = ๏ช๏ช1 a 3 ๏ช๏ซ1 a 2 a 2 ๏บ๏ป 1๏น a 2 ๏บ๏บ a ๏บ๏ป The load sequence impedance matrix comes out as 0 0 ๏น ๏ฉ6 + j 30 ๏ช Zs = ๏ช 0 6 + j 21 0 ๏บ๏บ ๏ 0 6 + j 21๏ป๏บ ๏ซ๏ช 0 see the result of Problem 9.18 ๏ฉ200๏25๏ฐ ๏น ๏ฉ1 1 1๏ช ๏ช ๏บ −1 −1 (b) Vp = ๏ช100๏ − 155๏ฐ๏บ ; Vs = A Vp ; A = ๏ช1 a 3 ๏ช๏ซ80๏100๏ฐ ๏บ๏ป ๏ช๏ซ1 a 2 1๏น a 2 ๏บ๏บ a ๏บ๏ป Symmetrical components of the line-to-neutral voltages are given by: V0 = 47.7739๏57.6268๏ฐ; V1 = 112.7841๏ − 0.0331๏ฐ; V2 = 61.6231๏45.8825๏ฐ V (c) Vs = Z s I s ; I s = Z s −1 Vs , which results in I 0 = 1.562๏ − 21.06๏ฐ; I1 = 5.164๏ − 74.0877๏ฐ; I 2 = 2.822๏ − 28.1722๏ฐ A ๏ฉ1 1 (d) I p = A I s ; A = ๏ช๏ช1 a 2 ๏ช๏ซ1 a 1๏น a ๏บ๏บ a 2 ๏บ๏ป The result is: I a = 8.706๏ − 51.99๏ฐ; I b = 5.062๏136๏ฐ; I c = 3.129๏32.04๏ฐ A 9.26 I0 = I1 = I2 = VLg 0 3 + j 4 + Z0 VLg1 3 + j 4 + Z1 VLg 2 3 + j 4 + Z2 = 5.039๏ − 57.65๏ฐ 5.039๏ − 57.65๏ฐ = = 0.2016๏ − 110.78๏ฐ A 25๏53.13๏ฐ ( 3 + j 4 ) + (12 + j16 ) = 272.4๏6.59๏ฐ = 10.896๏ − 46.54๏ฐ A 25๏53.13๏ฐ = 27.82๏ − 76.05๏ฐ = 1.1128๏ − 129.18๏ฐ A 25๏53.13๏ฐ 201 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฉ I a ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ช I b ๏บ = ๏ช1 a ๏ช I c ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ0.2016๏ − 110.78๏ฐ ๏น a ๏บ๏บ ๏ช๏ช 10.896๏ − 46.54๏ฐ ๏บ๏บ a 2 ๏บ๏ป ๏ช๏ซ1.1128๏ − 129.18๏ฐ ๏บ๏ป ๏ฉ0.2016๏ − 110.78๏ฐ + 10.896๏ − 46.54๏ฐ + 1.1128๏ − 129.18๏ฐ ๏น = ๏ช๏ช0.2016๏ − 110.78๏ฐ + 10.896๏193.46๏ฐ + 1.1128๏ − 9.18๏ฐ ๏บ๏บ ๏ช๏ซ0.2016๏ − 110.78๏ฐ + 10.896๏73.46 + 1.1128๏110.82๏ฐ ๏บ๏ป ๏ฉ 6.72 − j8.96 ๏น ๏ฉ11.2 ๏ − 53.13 ๏ฐ๏น = ๏ช๏ช − 9.57 − j 2.902 ๏บ๏บ = ๏ช๏ช 10 ๏ − 163.1 ๏ฐ ๏บ๏บ A ๏ช๏ซ2.635 + j11.297๏บ๏ป ๏ช๏ซ 11.6๏76.87 ๏ฐ ๏บ๏ป Also, since the source and load neutrals are connected with a zero-ohm neutral wire, ๏ฉ I a ๏น ๏ฉVag / ( 3 + j 4 + ZY ) ๏น ๏ฉ 280๏0๏ฐ / 25๏53.13๏ฐ ๏น ๏ฉ11.2๏ − 53.13๏ฐ ๏น ๏บ ๏ช ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช I b ๏บ = ๏ชVbg / ( 3 + j 4 + ZY ) ๏บ = ๏ช250๏ − 110๏ฐ / 25๏53.13๏ฐ ๏บ = ๏ช 10๏ − 163.1๏ฐ ๏บ A ๏ช I c ๏บ ๏ชV / ( 3 + j 4 + Z ) ๏บ ๏ช๏ซ 290๏130๏ฐ / 25๏53.13๏ฐ ๏บ๏ป ๏ช๏ซ 11.6๏76.87๏ฐ ๏บ๏ป ๏ซ ๏ป ๏ซ๏ช cg ๏บ Y ๏ป Which checks. 9.27 (a) KVL : Van = Z aa I a + Z ab I b + Z ab I c + Z an I n + Va๏ขn๏ข − ( Z nn I n + Z an I c + Z an I b + Z an I a ) Voltage drop across the line section is given by Van − Va๏ขn๏ข = ( Z aa − Z an ) I a + ( Z ab − Z an )( I b + I c ) + ( Z an − Z nn ) I n Similarly for phases b and c Vbn − Vb๏ขn๏ข = ( Z aa − Z an ) I b + ( Z ab − Z an )( I a + I c ) + ( Z an − Z nn ) I n Vcn๏ข − Vc๏ขn๏ข = ( Z aa − Z an ) I c + ( Z ab − Z an )( I a + I b ) + ( Z an − Z nn ) I n KCL : In = − ( Ia + Ib + Ic ) Upon substitution Van − Va๏ขn๏ข = ( Z aa + Z nn − 2 Z an ) I a + ( Z ab + Z nn − 2 Z an ) I b + ( Z ab + Z nn − 2 Z an ) I c Vbn − Vb๏ขn๏ข = ( Z ab + Z nn − 2 Z an ) I a + ( Z aa + Z nn − 2 Z an ) I b + ( Z ab + Z nn − 2 Z an ) I c Vcn − Vc๏ขn๏ข = ( Z ab + Z nn − 2 Z an ) I a + ( Z ab + Z nn − 2 Z an ) I b + ( Z aa + Z nn − 2 Z an ) I c The presence of the neutral conductor changes the self- and mutual impedances of the phase conductors to the following effective values: Z s ๏ Z aa + Z nn − 2 Z an ; Z m ๏ Z ab + Z nn − 2 Z an 202 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Using the above definitions ๏ฉVaa๏ข ๏น ๏ฉVan − Va๏ขn๏ข ๏น ๏ฉ Z s ๏ช ๏บ ๏ช ๏บ ๏ช ๏ชVbb๏ข ๏บ = ๏ชVbn − Vb๏ขn๏ข ๏บ = ๏ช Z m ๏ชVcc๏ข ๏บ ๏ชVcn − Vc๏ขn๏ข ๏บ ๏ช Z m ๏ซ ๏ป ๏ซ ๏ป ๏ซ Zm Zs Zm Zm ๏น ๏ฉIa ๏น ๏บ๏ช ๏บ Zm ๏บ ๏ชIb ๏บ Z s ๏บ๏ป ๏ช๏ซ I c ๏บ๏ป Where the voltage drops across the phase conductors are denoted by Vaa๏ข , Vbb๏ข , and Vcc๏ข . (b) The a-b-c voltage drops and currents of the line section can be written in terms of their symmetrical components according to Eq. (9.1.9); with phase a as the reference phase, one gets ๏ฉVaa๏ข0 ๏น ๏ฌ ๏ฉ Z s − Z m ๏ช ๏บ ๏ฏ๏ช A ๏ชVaa๏ข1 ๏บ = ๏ญ ๏ช ๏ชVaa๏ข2 ๏บ ๏ฏ ๏ช ๏ซ ๏ป ๏ฎ๏ซ Zs − Zm ๏น ๏ฉ Zm ๏บ ๏ช ๏บ + ๏ช Zm Z s − Z m ๏บ๏ป ๏ช๏ซ Z m Zm Zm Zm Zm ๏น ๏ผ ๏ฉIa0 ๏น ๏บ๏ฏ ๏ช ๏บ Z m ๏บ ๏ฝ A ๏ช I a1 ๏บ Z m ๏บ๏ป ๏ฏ๏พ ๏ช๏ซ I a 2 ๏บ๏ป Multiplying across by A−1, ๏ฌ ๏ฉVaa๏ข0 ๏น ๏ฉ1 ๏น ๏ฉ1 1 1๏น ๏ผ ๏ฉ I a 0 ๏น ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ๏ฏ ๏ช ๏บ −1 ๏ฏ ๏ชVaa๏ข1 ๏บ = A ๏ญ( Z s − Z m ) ๏ช 1 ๏บ + Z m ๏ช1 1 1๏บ ๏ฝ A ๏ช I a1 ๏บ ๏ฏ ๏ชVaa๏ข2 ๏บ ๏ช๏ซ ๏ช๏ซ1 1 1๏บ๏ป ๏ฏ๏พ ๏ช๏ซ I a 2 ๏บ๏ป 1๏บ๏ป ๏ซ ๏ป ๏ฎ or ๏ฉVaa๏ข0 ๏น ๏ฉ Z s − 2 Z m ๏ชV ๏บ = ๏ช ๏ช aa๏ข1 ๏บ ๏ช ๏ช๏ซVaa๏ข2 ๏บ๏ป ๏ช๏ซ Zs − Zm ๏น ๏ฉIa0 ๏น ๏บ๏ช ๏บ ๏บ ๏ช I a1 ๏บ Z s − Z m ๏บ๏ป ๏ช๏ซ I a 2 ๏บ๏ป Now define zero-, positive-, and negative-sequence impedances in terms of Z s and Z m as Z 0 = Z s + 2 Z m = Z aa + 2 Z ab + 3 Z nn − 6 Z an Z1 = Z s − Z m = Z aa − Z ab Z 2 = Z s − Z m = Z aa − Z ab Now, the sequence components of the voltage drops between the two ends of the line section can be written as three uncoupled equations: Vaa๏ข0 = Van 0 − Va๏ขn๏ข0 = Z 0 I a 0 Vaa๏ข1 = Van1 − Va๏ขn๏ข1 = Z1 I a1 Vaa๏ข2 = Van 2 − Va๏ขn๏ข2 = Z 2 I a 2 203 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 9.28 (a) The sequence impedances are given by Z 0 = Z aa + 2 Z ab + 3 Z nn − 6 Z an = j 60 + j 40 + j 240 − j180 = j160 ๏ Z1 = Z 2 = Z aa − Z ab = j 60 − j 20 = j 40 ๏ The sequence components of the voltage drops in the line are ๏ฉVaa๏ข 0 ๏น ๏ฉ(182.0 − 154.0 ) + j ( 70.0 − 28.0 ) ๏น ๏ฉVan − Va๏ขn๏ข ๏น ๏ช ๏บ ๏บ ๏บ −1 ๏ช −1 ๏ช ๏ชVaa๏ข1 ๏บ = A ๏ชVbn − Vb๏ขn๏ข ๏บ = A ๏ช( 72.24 − 44.24 ) − j ( 32.62 − 74.62 ) ๏บ ๏ช ๏บ ๏ช ๏ช ๏บ V − V − 170.24 − 198.24 + j 88.62 − 46.62 ) ( )๏บ๏ป c ๏ขn๏ข ๏ป ๏ซ cn ๏ซ ( ๏ช๏ซVaa๏ข 2 ๏บ๏ป ๏ฉ28.0 + j 42.0 ๏น ๏ฉ28.0 + j 42.0 ๏น ๏บ kV = A ๏ช๏ช28.0 + j 42.0 ๏บ๏บ = ๏ช๏ช 0 ๏บ ๏ช๏ซ28.0 + j 42.0 ๏บ๏ป ๏ช๏ซ ๏บ๏ป 0 −1 From Problem 9.22 result, it follows that Vaa๏ข0 = 28,000 + j 42,000 = j160 I a 0 ; Vaa๏ข1 = 0 = j 40 I a1 ; Vaa๏ข2 = 0 = j 40 I a 2 From which the symmetrical components of the currents in phase a are I a 0 = ( 262.5 − j175) A; I a1 = I a 2 = 0 The line currents are then given by I a = I b = I c = ( 262.5 − j175 ) A (b) Without using symmetrical components: The self- and mutual impedances [see solution of Problem 9.22(a)] are Z s = Z aa + Z nn − 2 Z an = j 60 + j80 − j 60 = j80 ๏ Z m = Z ab + Z nn − 2 Z an = j 20 + j80 − j 60 = j 40 ๏ So, line currents can be calculated as [see solution of Problem 9.22(a)] ๏ฉVaa๏ข ๏น ๏ฉ28 + j 42 ๏น ๏ฉ j80 ๏ช ๏บ ๏ช ๏บ ๏ช 3 ๏ชVbb๏ข ๏บ = ๏ช28 + j 42 ๏บ ๏ด 10 = ๏ช j 40 ๏ชVcc๏ข ๏บ ๏ช๏ซ28 + j 42 ๏บ๏ป ๏ช๏ซ j 40 ๏ซ ๏ป ๏ฉ I a ๏น ๏ฉ j80 ๏ช ๏บ ๏ช ๏ช I b ๏บ = ๏ช j 40 ๏ช I c ๏บ ๏ช๏ซ j 40 ๏ซ ๏ป j 40 j80 j 40 j 40 ๏น j 40 ๏บ๏บ j80 ๏บ๏ป −1 j 40 j80 j 40 j 40 ๏น ๏ฉ I a ๏น ๏ช ๏บ j 40 ๏บ๏บ ๏ช I b ๏บ j80 ๏บ๏ป ๏ช๏ซ I c ๏บ๏ป ๏ฉ28 + j 42 ๏น ๏ช 28 + j 42 ๏บ ๏ด 103 ๏ช ๏บ ๏ช๏ซ 28 + j 42 ๏บ๏ป ๏ฉ262.5 − j175๏น = ๏ช๏ช262.5 − j175 ๏บ๏บ A ๏ช๏ซ262.5 − j175 ๏บ๏ป 204 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 9.29 Z1 = Z 2 = j 0.5 ๏ด 200 = j100 ๏ Z 0 = j 2 ๏ด 200 = j 400 ๏ Y1 = Y2 = j 3 ๏ด 10 −9 ๏ด 200 ๏ด 103 = j 6 ๏ด 10 −4 S Y0 = j1 ๏ด 10 −9 ๏ด 200 ๏ด 103 = j 2 ๏ด 10 −4 S Nominal- ๏ฐ sequence circuits are shown below: 9.30 (a) I AB = VAB 480๏0° = = 23.31๏ − 29.05° A (18 + j10 ) 20.59๏29.05° I BC = VBC 480๏120° = = 23.31๏ − 149.05° A 18 + j 10 20.59 ๏29.05° ( ) (b) I A = I AB = 23.31๏ − 29.05° A I B = I BC − I AB = 23.31๏ − 149.05° - 23.31๏ − 29.05° I B = −40.37 − j 0.6693 = 40.38๏180.95° A I C = − I BC = 23.31๏30.95° A ๏ฉIL0 ๏น ๏ฉ1 1 1 ๏น ๏ฉ23.31๏ − 29.05°๏น ๏ช ๏บ 1๏ช (c) ๏ช I L1 ๏บ = ๏ช1 a a 2 ๏บ๏บ ๏ช๏ช 40.38๏180.95° ๏บ๏บ 3 ๏ชIL2 ๏บ ๏ช๏ซ1 a 2 a ๏บ๏ป ๏ช๏ซ 23.31๏30.95° ๏บ๏ป ๏ซ ๏ป ๏ฉ 23.31๏ − 29.05๏ฐ + 40.38๏180.95๏ฐ + 23.31๏30.95๏ฐ ๏น 1๏ช = ๏ช23.31๏ − 29.05๏ฐ + 40.38๏300.95๏ฐ + 23.31๏270.95๏ฐ ๏บ๏บ 3 ๏ช๏ซ 23.31๏ − 29.05๏ฐ + 40.38๏60.95๏ฐ + 23.31๏150.95๏ฐ ๏บ๏ป 0 + j0 0 ๏ฉ ๏น ๏ฉ ๏น ๏ช ๏บ ๏ช = ๏ช13.84 − j 23.09๏บ = ๏ช 26.92๏ − 59.06๏ฐ๏บ๏บ A ๏ช๏ซ6.536 + j11.77๏บ๏ป ๏ช๏ซ 13.46๏60.96๏ฐ ๏บ๏ป 205 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 9.31 I Line 0 = I Line 2 = 0 ๏ฆ 200 ๏ถ ๏ง ๏ท ๏90๏ฐ 3๏ธ ๏จ I Line1 = = ๏ฆ Z๏ ๏ถ ๏ฆ 10 ๏ถ Z Line1 + ๏ง ๏ท 0.5๏80๏ฐ + ๏ง 3 ๏ท ๏40๏ฐ ๏จ ๏ธ ๏จ 3 ๏ธ Vg1 = 115.47๏90๏ฐ 115.47๏90๏ฐ = = 30.96๏45.05๏ฐ A 2.64 + j 2.635 3.73๏44.95๏ฐ 9.32 206 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Vgan = Vg1 = Vm1 + Z Line1 I m1 I m1 = 5000๏ cos−1 0.8 200 3 ( 0.8 ) = 18.04๏36.87๏ฐ A 200 ๏0๏ฐ + ( 0.5๏80๏ฐ )(18.04๏36.87๏ฐ ) 3 = 115.47 + ( −4.077 + j8.046 ) Vgan = = 111.39 + j8.046 = 111.7๏4.131๏ฐ V Vg = 3 (111.7 ) = 193.5V (Line to Line) 9.33 Converting the ๏ load to an equivalent Y, and then writing two loop equations: ๏ฉ 2 ( Z L + ZY ) − ( Z L + ZY ) ๏น ๏ฉ I ๏น ๏ฉVcg − Vag ๏น ๏ช ๏บ๏ช c ๏บ = ๏ช ๏บ − Z + Z 2 Z + Z ๏ช ( L ( L Y ) ๏บ๏ป ๏ซ − I b ๏ป ๏ช๏ซVag − Vbg ๏บ๏ป Y ) ๏ซ ๏ฉ 21.46๏43.78๏ฐ −10.73๏43.78๏ฐ ๏น ๏ฉ I c ๏น ๏ฉ295๏115๏ฐ − 277๏0๏ฐ ๏น ๏ช −10.73๏43.78๏ฐ 21.46๏43.78๏ฐ ๏บ ๏ช ๏บ = ๏ช ๏บ ๏ช๏ซ ๏บ๏ป ๏ซ − I b ๏ป ๏ซ277๏0๏ฐ − 260๏ − 120๏ฐ ๏ป −1 ๏ฉ I c ๏น ๏ฉ 21.46๏43.78๏ฐ −10.73๏43.78๏ฐ๏น ๏ฉ 482.5๏146.35๏ฐ๏น ๏ช ๏บ = ๏ช −10.73๏43.78๏ฐ 21.46๏43.78๏ฐ ๏บ ๏ช ๏บ ๏ซ − I b ๏ป ๏ซ๏ช ๏ป๏บ ๏ซ 465.1๏28.96๏ฐ ๏ป ๏ฉ I c ๏น ๏ฉ 0.06213๏ − 43.78๏ฐ 0.03107๏ − 43.78๏ฐ ๏น ๏ฉ 482.5๏146.35๏ฐ๏น ๏ช ๏บ = ๏ช 0.03107๏ − 43.78๏ฐ 0.06213๏ − 43.78๏ฐ ๏บ ๏ช ๏บ ๏บ๏ป ๏ซ 465.1๏28.96๏ฐ ๏ป ๏ซ − I b ๏ป ๏ช๏ซ ๏ฉ I c ๏น ๏ฉ 29.98๏102.57๏ฐ + 14.45๏ − 14.82๏ฐ ๏น ๏ฉ7.445 + j 25.57 ๏น ๏ช ๏บ=๏ช ๏บ=๏ช ๏บ ๏ซ − I b ๏ป ๏ซ14.99๏102.57๏ฐ + 28.90๏ − 14.82๏ฐ ๏ป ๏ซ24.68 + j 7.239 ๏ป ๏ฉ I c ๏น ๏ฉ 26.62๏73.77๏ฐ๏น ๏ช ๏บ=๏ช ๏บA ๏ซ − I b ๏ป ๏ซ 25.71๏16.34๏ฐ ๏ป 207 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Also, I a = − I b − I c I a = ( 24.68 + j 7.239 ) − ( 7.445 + j 25.57 ) I a = 17.23 − j18.33 = 25.15๏ − 46.76๏ฐ ๏ฉ I a ๏น ๏ฉ 25.15๏ − 46.76๏ฐ๏น ๏ช ๏บ ๏ช ๏บ ๏ช I b ๏บ = ๏ช 25.71๏196.34๏ฐ ๏บ A ๏ช๏ซ I c ๏บ๏ป ๏ช๏ซ 26.62๏73.77๏ฐ ๏บ๏ป which agrees with Ex. 9.6. The symmetrical components method is easier because it avoids the need to invert a matrix. 9.34 The line-to-ground fault on phase a of the machine is shown below, along with the corresponding sequence networks: With the base voltage to neutral 13.8 3 kV , Va = 0; Vb = 1.013๏ − 102.25๏ฐ; with Z base (13.8 ) = 9.52 ๏, Z = j 2.38 = j 0.25; Z = j3.33 = j 0.35; = = ( −0.215 − j 0.99 ) pu Vc = 1.013๏102.25๏ฐ pu. = ( −0.215 + j 0.99 ) pu 2 Zg0 = 20 1 2 9.52 9.52 j 0.95 = j 0.1; Z n = 0; Z 0 = j 0.1pu 9.52 208 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. The symmetrical components of the voltages at the fault point are ๏ฉVa 0 ๏น ๏ฉ1 1 ๏ช ๏บ 1๏ช ๏ชVa1 ๏บ = 3 ๏ช1 a ๏ชVa 2 ๏บ ๏ช๏ซ1 a 2 ๏ซ ๏ป Ia0 = − I a1 = 1 ๏น๏ฉ 0 ๏น ๏ฉ −0.143 + j 0 ๏น ๏บ ๏ช a 2 ๏บ ๏ช −0.215 − j 0.99 ๏บ๏บ = ๏ช๏ช 0.643 + j 0 ๏บ๏บ pu a ๏บ๏ป ๏ช๏ซ −0.215 + j 0.99๏บ๏ป ๏ช๏ซ −0.500 + j 0 ๏บ๏ป ( −0.143 + j 0 ) = − j1.43pu Va 0 =− Zg0 j 0.1 Ean − Va1 (1 + j 0 ) − ( 0.643 + j 0 ) = = − j1.43pu Z1 j 0.25 Ia2 = − ( −0.5 + j 0 ) = − j1.43pu Va 2 =− Z2 j 0.35 ๏ Fault current into the ground I a = I a 0 + I a1 + I a 2 = 3I a 0 = − j 4.29 pu With base current 20,000 3 ๏ด 13.8 = 837 A , the subtransient current in line a is I a = 4.29 ๏ด 837 = 3590 A Line-to-line voltages during the fault are: (on base voltage to neutral) Vab = Va − Vb = 0.215 + j 0.99 = 1.01๏77.7๏ฐ pu = 8.05๏77.7๏ฐ kV Vbc = Vb − Vc = 0 − j1.98 = 1.98๏270๏ฐ pu = 15.78๏270๏ฐ kV Vca = Vc − Va = −0.215 + j 0.99 = 1.01๏102.3๏ฐ pu = 8.05๏102.3๏ฐ kV Phasor diagrams of line voltages before and after the fault are shown below: Vab = 13.8๏30๏ฐ kV Vab = 8.05๏77.7๏ฐ kV Vbc = 13.8๏270๏ฐ kV Vbc = 15.78๏270๏ฐ kV Vca = 13.8๏150๏ฐ kV Vca = 8.05๏102.3๏ฐ kV (Balanced) (Unbalanced) 9.35 Base MVA = 100 100 100 100 = 0.5; G2 : X = 0.15 ๏ด = 0.375; G3 : X = 0.15 ๏ด = 0.375 20 40 40 100 100 Reactors: X1 = 0.05 ๏ด = 0.25; X 2 = 0.04 ๏ด = 0.25pu. 20 16 G1 : X = 0.1 ๏ด Per-phase reactance diagram is shown below: (Excluding the source) [in pu] 209 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฉ๏ซ j 0.5 j ( 0.25 + 0.2344 )๏น๏ป with respect to f = j 0.246 100 = 406.5MVA ๏ฌ 0.246 406.5 ๏ด 106 Fault Current = = 17,780 A 3 ๏ด 13.2 ๏ด 103 = 17.78 kA ๏ Fault MVA = 9.36 Line-to-ground fault: Let Va = 0; I b = I c = 0 ๏ฌ Then I a 0 = 1 1 Ia + Ib + Ic ) = Ia ( 3 3 1 1 I a + aI b + a 2 I c ) = I a ( 3 3 1 1 I a 2 = ( I a + a 2 I b + aI c ) = I a 3 3 I a1 = 1 so that I a 0 = I a1 = I a 2 = I a ; Va 0 + Va1 + Va 2 = 0 ๏ฌ 3 Sequence network interconnection is shown below: I 0 = I1 = I 2 = Ea Z 0 + Z1 + Z 2 V0 + V1 + V2 = 0 Ia = ๏ฌ 3Ea Z 0 + Z1 + Z 2 210 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 9.37 (a) Short circuit between phases b and c: I b + I c = 0; I a = 0 (Open Line); Vb = Vc then I a 0 = 0; 1 1 0 + aI b + a 2 I c ) = ( aI b − a 2 I b ) ( 3 3 1 = ( a − a2 ) Ib 3 1 1 1 I a 2 = ( 0 + a 2 I b + aI c ) = ( a 2 I b − aI b ) = ( a 2 − a ) I b 3 3 3 I a1 = so that I a1 = − I a 2 From Vb = Vc , one gets Va 0 + a 2Va1 + aVa 2 = Va 0 + aVa1 + a 2Va 2 so that Va1 = Va 2 Sequence network interconnection is shown below: (b) Double line-to-ground fault: Fault conditions in phase domain are represented by I a = 0; Vb = Vc = 0 1 Sequence components: Va 0 = Va1 = Va 2 = Va 3 I a 0 + I a1 + I a 2 = 0 Sequence network interconnection is shown below: 9.38 (a) 211 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (b) 9.39 212 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 2 9.40 ๏ฆ 345 ๏ถ ๏ฆ 100 ๏ถ X pu new = ( 0.09 ) ๏ง ๏ท ๏ง ๏ท = 0.02755 per unit ๏จ 360 ๏ธ ๏จ 300 ๏ธ 9.41 2 ๏ฆ 18 ๏ถ ๏ฆ 100 ๏ถ X g1− 0 = ( 0.05 ) ๏ง ๏ท ๏ง ๏ท = 0.0054 = X g 2 −0 ๏จ 20 ๏ธ ๏จ 750 ๏ธ ๏ฆ 100 ๏ถ X m 3− 0 = ( 0.05 ) ๏ง ๏ท = 0.003333 ๏จ 1500 ๏ธ 2 ๏ฆ 18 ๏ถ X n 2 = ( 0.06 ) ๏ง ๏ท = 0.0486 ๏จ 20 ๏ธ 9.42 3 X n 2 = 0.1458 VA1 = 1๏45๏ฐ + 30๏ฐ = 1๏75๏ฐ = 0.2588 + j 0.9659 VA 2 = 0.5๏250 − 30๏ฐ = 0.5๏220๏ฐ = −0.383 − j 0.321 VA = VA1 + VA 2 = 0.12422 + j 0.645 = 0.656๏100.91๏ฐ VB1 = a 2VA1 = 1๏315๏ฐ = 1๏ − 45๏ฐ = 0.7071 − j 0.7071 VB 2 = aVA 2 = 0.5๏340๏ฐ = 0.5๏ − 20๏ฐ = 0.469 − j 0.171 VB = VB1 + VB 2 = 1.177 − j 0.878 = 1.47๏ − 36.7๏ฐ VC1 = aVA1 = 1๏195๏ฐ = −0.9659 − j 0.2588 VC 2 = a 2VA2 = 0.5๏100๏ฐ = −0.0868 + j 0.492 VC = VC1 + VC 2 = −1.053 − j 0.234 = 1.078๏167.49๏ฐ 213 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Line-to-line voltages are given by: [in pu on line-neutral voltage base] VAB = VA − VB = −1.301 + j1.523 = 2๏130.5๏ฐ ๏ฌ VBC = VB − VC = 2.32 − j1.112 = 2.57๏ − 25.6๏ฐ ๏ฌ VCA = VC − VA = −1.177 − j 0.411 ๏ฌ Note: Divide by 3 ๏ฏ ๏ญif the base is ๏ฏline-to-line voltage ๏ฎ = 1.25๏ − 160.75๏ฐ ๏ฌ Load impedance in each phase is 1๏0๏ฐ pu. ๏ I a1 = Va1 in pu; I a 2 = Va 2 in pu Thus I A = VA in pu I A = 0.656๏100.91๏ฐ pu ๏ผ ๏ฏ I B = 1.47๏ − 36.7๏ฐ pu ๏ฝ ๏ฌ ๏ฏ I C = 1.078๏167.49๏ฐ pu ๏พ 9.43 (a) e j 90๏ฐ : i Per Unit Zero Sequence X1 = X 2 = X3 = 1 ( 0.1 + 0.1 − 0.1) 2 e j 90๏ฐ : i (e+ j 90๏ฐ : i) (e j 90๏ฐ : i) = 0.05 per unit Per Unit Positive Sequence (Per Unit Negative Sequence) (b) Per Unit Zero Sequence Per Unit Positive Sequence (Per Unit Negative Sequence) 214 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (c) Per unit Zero Sequence e j 23.40 : i (e− j 23.40 : i) Per Unit Positive Sequence (Per Unit Negative Sequence) 9.44 Per Unit Zero Sequence Network Per Unit Positive (or Negative) Sequence Network (Phase Shift Not Shown) p-primary s-secondary t-tertiary 215 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 9.45 S3๏ฆ = Van I a* + Vbn I b* + Vcn I c* = ( 280๏0๏ฐ )(14 ๏53.13๏ฐ ) + ( 250๏ − 110๏ฐ )(12.5๏163.1๏ฐ ) + ( 290๏130๏ฐ )(14.5๏ − 76.87๏ฐ ) = 3920๏53.13๏ฐ + 3125๏53.1๏ฐ + 4205๏53.13๏ฐ = 6751 + j8999 P3๏ฆ = Re S3๏ฆ = 6751W ๏ผ๏ฏ ๏ฝ delivered to the load. Q3๏ฆ = Im S3๏ฆ = 8999vars๏ฏ๏พ 9.46 (a) Z0 = Z y + 3 Zn = 2 + j 2 + j3 = 2 + j 5 = 5.385๏68.20๏ฐ (b) I 0 = V0 10๏60๏ฐ = Z 0 5.385๏68.20๏ฐ I 0 = 1.857๏ − 8.199๏ฐ A Z1 = ZY // I1 = Z๏ = ( 2 + j 2 ) // ( 2 + j 2 ) = 1 + j = 2๏45๏ฐ.๏ 3 V1 100๏0๏ฐ = = 70.71๏ − 45๏ฐ A Z1 2๏45๏ฐ Z 2 = Z1 = 2๏45๏ฐ๏ I2 = V2 15๏200๏ฐ = = 10.61๏155๏ฐ A Z2 2 ๏45๏ฐ S0 = V0 I 0* = (10๏60๏ฐ )(1.857๏8.199๏ฐ ) = 6.897 + j17.24 S0 = 18.57๏68.199๏ฐ S1 = V1 I1* = (100๏0๏ฐ )( 70.71๏45๏ฐ ) = 5000 + j 5000 S1 = 7071๏45๏ฐ S2 = V2 I 2* = (15๏200๏ฐ )(10.61๏ − 155๏ฐ ) = 112.5 + j112.5 216 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. S2 = 159.๏45๏ฐ (c) S3๏ฆ = 3 ( S0 + S1 + S2 ) = 3 ( 5119 + j 5129 ) S3๏ฆ = 15,358. + j15,389. S3๏ฆ = 21.74 ๏ด 103 ๏45.06๏ฐ VA 9.47 S3๏ฆ = Va 0 I a*0 + Va1 I a*1 + Va 2 I a*2 Substituting values of voltages and currents from the solution of Problem 9.12, S3๏ฆ = 0 + ( 0.9857๏43.6๏ฐ )( 0.9857๏ − 43.6๏ฐ ) + ( 0.2346๏250.3๏ฐ )( 0.2346๏ − 250.3๏ฐ ) = ( 0.9857 ) + ( 0.2346 ) 2 2 = 1.02664 pu With the three-phase 500-kVA base, S3๏ฆ = 513.32 kW To compute directly: The Equivalent ๏-Connected resistors are R๏ = 3RY = 3 ๏ด 10.58 = 31.74 ๏ From the given line-to-line voltages S3๏ฆ = Vab 2 R๏ + Vbc R๏ 2 + Vca R๏ (1840 ) + ( 2760 ) + ( 2300 ) 2 = 2 2 2 31.74 = 513.33 kW 9.48 The complex power delivered to the load in terms of symmetrical components: S3๏ฆ = 3 (Va 0 I a*0 + Va1I a*1 + Va 2 I a*2 ) Substituting values from the solution of Problem 9.20, S3๏ฆ = 3 ๏ฉ๏ซ 47.7739๏57.6268๏ฐ (1.562๏21.06๏ฐ ) + 112.7841๏ − 0.0331๏ฐ ( 5.164๏74.0877๏ฐ ) +61.6231๏45.8825๏ฐ ( 2.822๏28.1722๏ฐ ) ๏น๏ป = 1154.7 + j1388.4 VA The complex power delivered to the load by summing up the power in each phase: S3๏ฆ = Va I a* + Vb I b* + Vc I c* ; with values from Problem 9.25 solution, 217 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. = 200๏25๏ฐ ( 8.706๏ − 51.99๏ฐ ) + 100๏ − 155๏ฐ ( 5.062๏136๏ฐ ) +80๏100๏ฐ ( 3.129๏32.04๏ฐ ) ๏น๏ป = 1154.7 + j1388.4 VA 9.49 From Problem 9.6(a) solution: Va = 116๏9.9๏ฐ V; Vb = 41.3๏ − 76๏ฐ V; Vc = 96.1๏168๏ฐ V From Problem 9.5, I a = 12๏0๏ฐ A; I b = 6๏ − 90๏ฐ A; I c = 8๏150๏ฐ A (a) In terms of phase values S = Va I a* + Vb I b* + Vc I c* = 116๏9.9๏ฐ (12๏0๏ฐ ) + 41.3๏ − 76๏ฐ ( 6๏90๏ฐ ) + 96.1๏168๏ฐ ( 8๏ − 150๏ฐ ) = ( 2339.4 + j 537.4 ) VA ๏ฌ (b) In terms of symmetrical components: V0 = 10๏0๏ฐ V; V1 = 80๏30๏ฐ V; V2 = 40๏ − 30๏ฐ V From Problem 9.6(a) I 0 = 1.82๏ − 21.5๏ฐ A; I1 = 8.37๏16.2๏ฐ A; I 2 = 2.81๏ − 36.3๏ฐ From Problem 9.5 Soln. ๏ S = 3 (V0 I 0* + V1 I1* + V2 I 2* ) = 3 ๏ฉ๏ซ10๏0๏ฐ (1.82๏21.5๏ฐ ) + 80๏30๏ฐ (8.37๏ − 16.2๏ฐ ) + 40๏ − 30๏ฐ ( 2.81๏36.3๏ฐ ) ๏น๏ป = 3 ( 779.8 + j179.2 ) = ( 2339.4 + j 537.4 ) VA ๏ฌ 218 © 2017 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Chapter 9 Symmetrical Components 10.1 Calculation of per unit reactances Synchronous generators: G1 X1 = X d๏ข๏ข = 0.18 X 2 = X d๏ข๏ข = 0.18 X 0 = 0.07 G2 X1 = X d๏ข๏ข = 0.20 X 2 = X d๏ข๏ข = 0.20 X 0 = 0.10 2 G3 ๏ฆ 13.8 ๏ถ ๏ฆ 1000 ๏ถ X1 = X d๏ข๏ข = 0.15 ๏ง ๏ท ๏ง ๏ท ๏จ 15 ๏ธ ๏จ 500 ๏ธ = 0.2539 X 2 = X d๏ข๏ข = 0.2539 2 ๏ฆ 13.8 ๏ถ ๏ฆ 1000 ๏ถ X 0 = 0.05 ๏ง ๏ท ๏ง ๏ท ๏จ 15 ๏ธ ๏จ 500 ๏ธ = 0.08464 3 X n = 3 X 0 = 0.2539 2 G4 ๏ฆ 13.8 ๏ถ ๏ฆ 1000 ๏ถ X1 = X d๏ข๏ข = 0.30 ๏ง ๏ท ๏ง ๏ท ๏จ 15 ๏ธ ๏จ 750 ๏ธ = 0.3386 2 2 ๏ฆ 13.8 ๏ถ ๏ฆ 1000 ๏ถ X 2 = 0.40 ๏ง ๏ท ๏ง ๏ท ๏จ 15 ๏ธ ๏จ 750 ๏ธ = 0.4514 ๏ฆ 13.8 ๏ถ ๏ฆ 1000 ๏ถ X 0 = 0.10 ๏ง ๏ท ๏ง ๏ท ๏จ 15 ๏ธ ๏จ 750 ๏ธ = 0.1129 Transformers: XT 1 = 0.10 XT 2 = 0.10 ๏ฆ 1000 ๏ถ XT 4 = 0.11๏ง ๏ท = 0.1467 ๏จ 750 ๏ธ ๏ฆ 1000 ๏ถ XT 3 = 0.12 ๏ง ๏ท ๏จ 500 ๏ธ = 0.24 Transmission Lines: ( 765) = 585.23 ๏ 2 Z base H = 1000 Positive๏ฏNegative Sequence Zero Sequence 50 X12 = = 0.08544 585.23 X12 = 150 585.23 = 0.2563 40 585.23 = 0.06835 100 585.23 = 0.1709 X13 = X 23 = X13 = X 23 = 219 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 10.1 Per Unit Sequence Networks j 0.1709 j 0.2563 j 0.1709 j 0.06835 j 0.08544 j 02539 j 0.06835 j 0.18 j 0.20 j 0.06835 j 0.08544 j 0.06835 j 0.2539 j 0.18 j 0.20 220 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 10.2 n = 1 (Bus 1 = Fault Bus) Thévenin equivalents as viewed from Bus 1: Per unit zero sequence VF = 1.0๏0๏ฐ per unit Per unit negative sequence Zero sequence Thévenin Equivalent: X0 = .10 //.5063 // (.1427 + .3376 ) X0 = 0.07114 per unit Negative Sequence Thévenin Equivalent: X2 = .28 //.7605 // (.04902 + .1872 ) X2 = 0.1097per unit Similarly, X1 = .28 //.7605 // (.04902 + .1745 ) = 0.1068 221 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 10.3 Three-phase fault at bus 1. Using the positive-sequence Thévenin equivalent from Problem 10.2: I base H = = I1 = Sbase 3๏ฆ 3 Vbase H 1000 3 ( 765 ) = 0.7547 kA VF 1.0๏0๏ฐ = = − j 9.363per unit Z1 j 0.1068 I0 = I2 = 0 ๏ฉ I A๏ข๏ข ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I B ๏บ = ๏ช1 a ๏ช I C๏ข๏ข ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ0 ๏น ๏ฉ9.363๏ − 90๏ฐ๏น ๏บ ๏ช a ๏บ ๏ช − j 9.363๏บ๏บ = ๏ช๏ช9.363๏150๏ฐ ๏บ๏บ per unit ๏บ๏ป ๏ช๏ซ9.363๏30๏ฐ ๏บ๏ป a 2 ๏บ๏ป ๏ช๏ซ0 ๏ฉ I A๏ข๏ข ๏น ๏ฉ9.363๏ − 90๏ฐ ๏น ๏ฉ7.067๏ − 90๏ฐ ๏น ๏ช ๏ข๏ข ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช I B ๏บ = ๏ช9.363๏150๏ฐ ๏บ ๏ด 0.7547 = ๏ช7.067๏150๏ฐ ๏บ kA ๏ช I C๏ข๏ข ๏บ ๏ช๏ซ9.363๏30๏ฐ ๏บ๏ป ๏ช๏ซ7.067๏30๏ฐ ๏บ๏ป ๏ซ ๏ป 10.4 (a) Calculation of Per Unit Line Reactances Note: The generator and transformer reactances are the same as given in the solution to Problem 10.1. Only the transmission line reactances change. Transmission Lines: ZbaseH = (500)2/1000 = 250 ohms Positive๏ฏNegative Sequence Zero Sequence 50 X12 = = 0.08544 0.20 per unit 585.23 250 X12 = 40 585.23 250 = 0.06835 X13 = X 23 = 150 585.23 250 = 0.2563 = 0.60 per unit 100 585.23 250 = 0.1709 X13 = X 23 = = 0.16 per unit = 0.40 per unit 222 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 10.4 (a) Per Unit Sequence Networks j 0.2539 j 0.18 j 0.20 j 0.2539 j 0.18 j 0.20 Note: only one impedance in the negative sequence network is different than in the positive sequence network. (b) n = 1 (Bus 1 = fault bus) Thévenin equivalents as viewed from bus 1: j 0.1247 j 0.1266 223 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Zero sequence Thévenin equivalent: X0 = 0.1 0.85 ( 0.3579 + 0.5667 ) X0 = 0.08158 per unit Negative sequence Thévenin equivalent: 0.4667 0.30 0.875 X2 = 0.25 0.9875 0.1192 0.28 0.875 0.4939 = 0.28 0.28 0.1951 0.70 0.2705 ( 0.1181 + 0.2143) X2 = 0.28// 0.875//(0.1192+0.1951) 0.1247 = 0.1266= per unit per unit Similarly, for Positive sequence: X1 = 0.28// 0.875//(0.1192+0.1836) = 0.1247 per unit (c) Three-phase fault at bus 1. Using the positive sequence Thévenin equivalent from Problem 10.4(b): I base H = j 0.1247 Sbase 3๏ฆ 3 Vbase H = 1000 3 ( 500 ) = 1.155 kA I0 = I2 = 0 I1 = VF 1.0 ๏0๏ฐ 8.0192 unit = = − j-j8.177 perper unit Z1 jj0.1223 0.1247 224 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฉ I A๏ข๏ข ๏น ๏ฉ1 1 1 ๏น ๏ฉ0 ๏น8.0192 ๏ฉ8.177 ๏ − 90๏ฐ๏น ๏ช ๏ข๏ข ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ 2 -j 8.0192 8.0192 ๏ช I B ๏บ = ๏ช1 a a ๏บ ๏ช − j8.177๏บ = ๏ช8.177 ๏150๏ฐ ๏บ per unit ๏ด 1.155 ๏ช I C๏ข๏ข ๏บ ๏ช๏ซ1 a a 2 ๏บ๏ป ๏ช๏ซ0 ๏บ๏ป8.0192 ๏ช๏ซ8.177 ๏30๏ฐ ๏บ๏ป ๏ซ ๏ป 9.26 ๏ฉ9.441๏ − 90๏ฐ ๏น ๏ช ๏บ = ๏ช9.441๏150๏ฐ ๏บ kA 9.26 9.26๏ช 9.441๏30๏ฐ ๏ซ ๏บ๏ป 10.5 Calculation of per unit reactances Synchronous generators: ๏ฆ 1000 ๏ถ X1 = X d๏ข๏ข = ( 0.2 ) ๏ง ๏ท = 0.4 ๏จ 500 ๏ธ X 2 = X d๏ข๏ข = 0.4 ๏ฆ 1000 ๏ถ X 0 = ( 0.10 ) ๏ง ๏ท ๏จ 500 ๏ธ = 0.20 ๏ฆ 1000 ๏ถ X1 = X d๏ข๏ข = 0.18 ๏ง ๏ท = 0.24 ๏จ 750 ๏ธ X 2 = X d๏ข๏ข = 0.24 ๏ฆ 1000 ๏ถ X 0 = 0.09 ๏ง ๏ท ๏จ 750 ๏ธ = 0.12 G3 X1 = 0.17 X 0 = 0.09 X base3 ( 20 ) = 0.4 ๏ = G1 G2 X 2 = 0.20 2 1000 3Xn = 3 ( 0.028 ) 0.4 = 0.21per unit Transformers: ๏ฆ 1000 ๏ถ XT 1 = 0.12 ๏ง ๏ท = 0.24 ๏จ 500 ๏ธ ๏ฆ 1000 ๏ถ XT 2 = 0.10 ๏ง ๏ท = 0.1333 ๏จ 750 ๏ธ XT 3 = 0.10 Each Line: ( 500 ) = 250 ๏ = 2 X base H 1000 X1 = X 2 = X0 = 50 = 0.20 per unit 250 150 = 0.60 per unit 250 225 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 226 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 10.6 n = 1 (Bus 1 = Fault Bus) Thévenin equivalents as viewed from Bus 1: Zero Sequence Thévenin equivalents: X 0 = 0.24 // ๏ฉ๏ซ.6 + (.7333 //.7 ) ๏น๏ป X 0 = .24 //.9581 = 0.1919 per unit Positive Sequence Thévenin equivalent: X1 = .64 // ๏ฉ๏ซ.2 + (.5733 //.47 ) ๏น๏ป X1 = .64 //.4583 X1 = 0.2670 per unit Negative Sequence Thévenin equivalent: X 2 = .64 // ๏ฉ๏ซ.2 + (.5733 //.50 ) ๏น๏ป X 2 = .64 //.4671 = 0.270 per unit 227 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 10.7 Three-phase fault at bus 1. Using the positive-sequence Thévenin equivalent from Problem 10.5: I base H = 1000 500 3 = 1.155 kA I1 = VF 1.0๏0๏ฐ = = 3.745๏ − 90๏ฐ per unit Z1 j 0.267 I0 = I2 = 0 ๏ฉ I A๏ข๏ข ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I B ๏บ = ๏ช1 a ๏ช I C๏ข๏ข ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ0 ๏น ๏ฉ3.745๏ − 90๏ฐ ๏น ๏บ ๏ช a ๏บ ๏ช3.745๏ − 90๏ฐ๏บ๏บ = ๏ช๏ช3.745๏150๏ฐ ๏บ๏บ per unit ๏บ๏ป ๏ช๏ซ3.745๏30๏ฐ ๏บ๏ป a 2 ๏บ๏ป ๏ช๏ซ0 ๏ฉ I A๏ข๏ข ๏น ๏ฉ3.745๏ − 90๏ฐ ๏น ๏ฉ 4.325๏ − 90๏ฐ ๏น ๏ช ๏ข๏ข ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช I B ๏บ = ๏ช3.745๏150๏ฐ ๏บ ๏ด 1.155 = ๏ช 4.325๏150๏ฐ ๏บ kA ๏ช I C๏ข๏ข ๏บ ๏ช๏ซ3.745๏30๏ฐ ๏บ๏ป ๏ช๏ซ 4.325๏30๏ฐ ๏บ๏ป ๏ซ ๏ป 10.8 Calculation of per unit reactances Synchronous generators: 2 G1 ๏ฆ 12 ๏ถ ๏ฆ 100 ๏ถ X1 = X d๏ข๏ข = 0.2 ๏ง ๏ท ๏ง ๏ท ๏จ 10 ๏ธ ๏จ 50 ๏ธ X1 = 0.576 per unit 2 ๏ฆ 12 ๏ถ ๏ฆ 100 ๏ถ X 0 = ( 0.1) ๏ง ๏ท ๏ง ๏ท ๏จ 10 ๏ธ ๏จ 50 ๏ธ X 0 = 0.288 per unit X 2 = X1 = .576 per unit G2 X1 = X d๏ข๏ข = 0.2 X 0 = 0.1 X 2 = 0.23 Transformers: ๏ฆ 100 ๏ถ XT 1 = 0.1๏ง ๏ท = 0.2 per unit ๏จ 50 ๏ธ XT 2 = 0.1per unit 228 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Each line: (138 ) = 190.44 ๏ = 2 Z base H 100 40 = 0.210 per unit 190.44 100 X0 = = 0.5251per unit 190.44 X1 = X 2 = 229 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 10.9 n = 1 (Bus 1 = Fault Bus) Thévenin equivalents as viewed from Bus 1: Zero Sequence Thévenin equivalent: Z 0 = j1.3502 per unit Positive Sequence Thévenin equivalent: Z1 = j.576 // j.92 = j 0.3542 per unit Negative Sequence Thévenin equivalent: Z 2 = j.576 // j.95 = j 0.3586 per unit 10.10 Three-phase fault at bus 1. Using the positive-sequence Thévenin equivalent from Problem 10.9: I base1 = 100 = 5.774 kA 10 3 V 1.0๏0๏ฐ I1 = F = = 2.823๏ − 90๏ฐ per unit Z1 j.3542 I0 = I2 = 0 ๏ฉ I A๏ข๏ข ๏น ๏ฉ1 1 ๏ช I ๏ข๏ข ๏บ = ๏ช1 a 2 ๏ช B๏บ ๏ช ๏ช๏ซ I C๏ข๏ข ๏บ๏ป ๏ช๏ซ1 a 1 ๏น ๏ฉ0 ๏น ๏ฉ2.823๏ − 90๏ฐ๏น ๏บ ๏ช a ๏บ ๏ช2.823๏ − 90๏ฐ๏บ๏บ = ๏ช๏ช2.823๏150๏ฐ ๏บ๏บ per unit ๏บ๏ป ๏ช๏ซ2.823๏30๏ฐ ๏บ๏ป a 2 ๏บ๏ป ๏ช๏ซ0 230 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฉ I A๏ข๏ข ๏น ๏ฉ2.823๏ − 90๏ฐ๏น ๏ฉ16.30๏ − 90๏ฐ๏น ๏ช I ๏ข๏ข ๏บ = ๏ช2.823๏150๏ฐ ๏บ ๏ด 5.774 = ๏ช16.30๏150๏ฐ ๏บ kA ๏ช B๏บ ๏ช ๏บ ๏ช ๏บ ๏ช๏ซ IC๏ข๏ข ๏บ๏ป ๏ช๏ซ2.823๏30๏ฐ ๏บ๏ป ๏ช๏ซ16.30๏30๏ฐ ๏บ๏ป 10.11 (a) The positive sequence network and steps in its reduction to its Thévenin equivalent are shown below: 231 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. The negative sequence network and its reduction is shown below: 232 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. The zero-sequence network and its reduction are shown below: (b) For a balanced 3-phase fault, only positive sequence network comes into picture. I sc = I a = I a1 = 1๏0๏ฐ = 3.23๏ − 90๏ฐ j ( 0.26 + 0.05 ) I sc = 3.23pu 233 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 10.12 The zero, positive, and negative sequence networks are shown below: Using delta-wye transformation and series-parallel combinations, Thévenin equivalents looking into bus 3 are shown below: 234 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. For a bolted 3-phase fault at bus 3, V1 = 0; Also V2 = V0 = 0 I 0 = 0; I 2 = 0 I1 = 1 ๏ 0๏ฐ = − j 5.71 j 0.175 The fault current is 5.71 pu. ๏ฉ I a ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ช I b ๏บ = ๏ช1 a ๏ช I c ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ0 ๏น ๏ฉ5.71๏ − 90๏ฐ๏น ๏บ ๏ช a ๏บ ๏ช − j 5.71๏บ๏บ = ๏ช๏ช5.71๏150๏ฐ ๏บ๏บ ๏บ๏ป ๏ช๏ซ5.71๏30๏ฐ ๏บ๏ป a 2 ๏บ๏ป ๏ช๏ซ0 10.13 For a balanced 3-phase fault at bus 3, we need the positive sequence impedance network reduced to its Thévenin equivalent viewed from bus 3. The development is shown below: Convert the ๏ formed by buses 1, 2 and 3 to an equivalent Y Z1X = ( j 0.125)( j 0.15) = j 0.0357143 Z2X = ( j 0.125)( j 0.25) = j 0.0595238 Z3 X = ( j 0.15)( j 0.25) = j 0.0714286 j 0.525 j 0.525 j 0.525 235 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Using series-parallel combinations, the positive sequence Thévenin impedance is given by, viewed from bus 3: ( j 0.2857143 )( j 0.3095238 ) + j 0.0714286 j 0.5952381 = j 0.1485714 + j 0.0714286 = j 0.22 With the no-load generated EMF to be 1๏0๏ฐ pu, the fault current is given by (with Z F = j 0.1 ) I a = I a1 = 1.0๏0๏ฐ j 0.22 + j 0.1 = − j 3.125pu = 820.1๏ − 90๏ฐ A The fault current is 820.1 A. 10.14 Bolted single-line-to-ground fault at bus 1. I 0 = I1 = I 2 = ๏ฉ I A๏ข๏ข ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I B ๏บ = ๏ช1 a ๏ช I C๏ข๏ข ๏บ ๏ช๏ซ1 a ๏ซ ๏ป VF Z 0 + Z1 + Z 2 = 1.0๏0๏ฐ j ( 0.07114 + 0.1068 + 0.1097 ) = 1.0๏0๏ฐ = − j 3.4766 per unit j 0.2876 1 ๏น ๏ฉ − j 3.4766 ๏น ๏ฉ − j10.43๏น ๏ฉ − j 7.871๏น ๏บ ๏ช ๏บ ๏ช ๏บ a ๏บ ๏ช − j 3.4766 ๏บ = ๏ช 0 ๏บ per unit = ๏ช๏ช 0 ๏บ๏บ kA ๏ช๏ซ 0 ๏บ๏ป a 2 ๏บ๏ป ๏ช๏ซ − j 3.4766 ๏บ๏ป ๏ช๏ซ 0 ๏บ๏ป 236 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Using Eq. (10.1): ๏ฉV0 ๏น ๏ฉ 0 ๏น ๏ฉ j 0.07114 ๏ช ๏บ ๏ช ๏บ ๏ช 0 ๏ชV1 ๏บ = ๏ช1.0๏0๏ฐ๏บ − ๏ช ๏ชV2 ๏บ ๏ช๏ซ 0 ๏บ๏ป ๏ช๏ซ 0 ๏ซ ๏ป 0 j 0.1068 0 ๏น ๏ฉ − j 3.4766 ๏น 0 ๏บ๏บ ๏ช๏ช − j 3.4766 ๏บ๏บ j 0.1097 ๏บ๏ป ๏ช๏ซ − j 3.4766 ๏บ๏ป 0 ๏ฉV0 ๏น ๏ฉ −0.2473 ๏น ๏ช ๏บ ๏ช ๏บ ๏ชV1 ๏บ = ๏ช 0.6287 ๏บ per unit ๏ชV2 ๏บ ๏ช๏ซ −0.3814 ๏บ๏ป ๏ซ ๏ป ๏ฉVAg ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ชVBg ๏บ = ๏ช1 a ๏ช ๏บ ๏ช1 a ๏ช๏ซVCg ๏บ๏ป ๏ซ 1 ๏น ๏ฉ −0.2473 ๏น ๏ฉ 0 ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช 0.6287 ๏บ = ๏ช0.9502๏247.0๏ฐ๏บ๏บ per unit a 2 ๏บ๏ป ๏ช๏ซ −0.3814 ๏บ๏ป ๏ช๏ซ 0.9502๏113.0๏ฐ ๏บ๏ป 10.15 Single-Line-to Ground Arcing Fault at Bus 1. ( 765) = 585.2 ๏ = 2 Z base H 1000 15๏0๏ฐ ZF = = 0.02563๏0๏ฐ per unit 585.2 VF I 0 = I1 = I 2 = Z 0 + Z1 + Z 2 + 3 Z F = 1.0๏0๏ฐ = 3.359๏ − 75.03๏ฐ per unit 0.0769 + j 0.2876 237 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฉ I A๏ข๏ข ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ช I B๏ข๏ข ๏บ = ๏ช1 a ๏ช I C๏ข๏ข ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ3.359๏ − 75.03๏ฐ ๏น ๏ฉ10.0771๏ − 75.03๏ฐ ๏น ๏บ per unit a ๏บ๏บ ๏ช๏ช3.359๏ − 75.03๏ฐ ๏บ๏บ = ๏ช๏ช 0 ๏บ ๏บ๏ป a 2 ๏บ๏ป ๏ช๏ซ3.359๏ − 75.03๏ฐ ๏บ๏ป ๏ช๏ซ 0 ๏ฉ7.605๏ − 75.03๏ฐ ๏น ๏บ kA = ๏ช๏ช 0 ๏บ ๏ช๏ซ ๏บ๏ป 0 ๏ฉV0 ๏น ๏ฉ 0 ๏น ๏ฉ j 0.07114 ๏ช ๏บ ๏ช ๏บ ๏ช 0 ๏ชV1 ๏บ = ๏ช1.0๏0๏ฐ ๏บ − ๏ช ๏ชV2 ๏บ ๏ช๏ซ 0 ๏บ๏ป ๏ช๏ซ 0 ๏ซ ๏ป 0 j 0.1068 0 0 ๏น ๏ฉ3.359๏ − 75.03๏ฐ ๏น 0 ๏บ๏บ ๏ช๏ช3.359๏ − 75.03๏ฐ ๏บ๏บ j 0.1097 ๏บ๏ป ๏ช๏ซ3.359๏ − 75.03๏ฐ ๏บ๏ป ๏ฉV0 ๏น ๏ฉ 0.2390๏ − 165.03๏ฐ ๏น ๏ช ๏บ ๏ช ๏บ ๏ชV1 ๏บ = ๏ช0.6600๏ − 8.0718๏ฐ ๏บ per unit ๏ชV2 ๏บ ๏ช๏ซ 0.3685๏ − 165.03๏ฐ ๏บ๏ป ๏ซ ๏ป ๏ฉVAg ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ชVBG ๏บ = ๏ช1 a ๏ชVCG ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ 0.2390๏ − 165.03๏ฐ ๏น ๏ฉ 0.2583๏ − 75.06๏ฐ ๏น a ๏บ๏บ ๏ช๏ช0.6600๏ − 8.0718๏ฐ ๏บ๏บ = ๏ช๏ช 0.9227๏ − 114.14๏ฐ ๏บ๏บ per unit a 2 ๏บ๏ป ๏ช๏ซ 0.3685๏ − 165.03๏ฐ ๏บ๏ป ๏ช๏ซ 0.9835๏112.84๏ฐ ๏บ๏ป 10.16 Bolted Line-to-Line Fault at Bus 1. VF = 1.0 ๏0๏ฐ I1 = − I 2 = = VF Z1 + Z 2 1.0๏0๏ฐ j.2165 = − j 4.619 per unit ๏ฉ I A๏ข๏ข ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I B ๏บ = ๏ช1 a ๏ช I C๏ข๏ข ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น๏ฉ 0 ๏น ๏ฉ 0 0 ๏น ๏ฉ ๏น ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช − j 4.619 ๏บ = ๏ช8.000๏180๏ฐ๏บ per unit = ๏ช6.038๏180๏ฐ๏บ๏บ kA ๏ช๏ซ 6.038๏0๏ฐ ๏บ๏ป a 2 ๏บ๏ป ๏ช๏ซ + j 4.619 ๏บ๏ป ๏ช๏ซ 8.000๏0๏ฐ ๏บ๏ป ๏ฉV0 ๏น ๏ฉ 0 ๏น ๏ฉ j.07114 ๏ช ๏บ ๏ช ๏บ ๏ช ๏ชV1 ๏บ = ๏ช1๏0๏ฐ๏บ − ๏ช 0 ๏ชV2 ๏บ ๏ช๏ซ 0 ๏บ๏ป ๏ช๏ซ 0 ๏ซ ๏ป ๏ฉVAg ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ชVBg ๏บ = ๏ช1 a ๏ช ๏บ ๏ช1 a ๏ช๏ซVCg ๏บ๏ป ๏ซ 0 j 0.1068 0 ๏น๏ฉ 0 ๏น๏ฉ 0 ๏น 0 ๏บ๏บ ๏ช๏ช − j 4.619 ๏บ๏บ ๏ช๏ช0.5067๏บ๏บ per unit j 0.1097 ๏บ๏ป ๏ช๏ซ − j 4.619๏บ๏ป ๏ช๏ซ 0.5067๏บ๏ป 0 1 ๏น ๏ฉ 0 ๏น ๏ฉ1.013๏0๏ฐ ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช0.5067 ๏บ = ๏ช0.5067๏180๏ฐ๏บ๏บ per unit a 2 ๏บ๏ป ๏ช๏ซ0.5067 ๏บ๏ป ๏ช๏ซ0.5067๏180๏ฐ๏บ๏ป 238 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 10.17 Bolted double-line-to-ground fault at bus 1. VF = 1.0๏0๏ฐ I1 = VF Z1 + Z 2 // Z 0 = 1.0๏0๏ฐ j (.1068 + .1097 //.0711) = 1.0๏0๏ฐ j 0.14995 = 6.669๏ − 90๏ฐ per unit ๏ฆ Z0 ๏ถ ๏ฆ .07114 ๏ถ I 2 = − I1 ๏ง ๏ท = j 6.669 ๏ง ๏ท ๏จ .18084 ๏ธ ๏จ Z0 + Z2 ๏ธ I 2 = j 2.623per unit ๏ฆ Z2 ๏ถ ๏ฆ .1097 ๏ถ I 0 = − I1 ๏ง ๏ท = j 6.669 ๏ง ๏ท = j 4.046 per unit ๏จ .18084 ๏ธ ๏จ Z0 + Z2 ๏ธ ๏ฉ I A๏ข๏ข ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I B ๏บ = ๏ช1 a ๏ช I C๏ข๏ข ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ j 4.046 ๏น ๏ฉ 0 0 ๏น ๏ฉ ๏น ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช − j 6.669 ๏บ = ๏ช10.08๏143.0๏ฐ ๏บ per unit = ๏ช7.607๏143๏ฐ๏บ๏บ kA ๏ช๏ซ 7.607๏37๏ฐ ๏บ๏ป a 2 ๏บ๏ป ๏ช๏ซ j 2.623 ๏บ๏ป ๏ช๏ซ10.08๏37.02๏ฐ๏บ๏ป ๏ฉV0 ๏น ๏ฉ 0 ๏น ๏ฉ j 0.07114 ๏ช ๏บ ๏ช ๏บ ๏ช 0 ๏ชV1 ๏บ = ๏ช1๏0๏ฐ๏บ − ๏ช ๏ชV2 ๏บ ๏ช๏ซ 0 ๏บ๏ป ๏ช๏ซ 0 ๏ซ ๏ป ๏ฉVAg ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ชVBg ๏บ = ๏ช1 a ๏ช ๏บ ๏ช1 a ๏ช๏ซVCg ๏บ๏ป ๏ซ 0 j 0.1068 0 ๏น ๏ฉ j 4.046 ๏น ๏ฉ 0.2878๏น 0 ๏บ๏บ ๏ช๏ช − j 6.669๏บ๏บ = ๏ช๏ช 0.2878๏บ๏บ per unit j 0.1097 ๏บ๏ป ๏ช๏ซ j 2.623 ๏บ๏ป ๏ช๏ซ 0.2878๏บ๏ป 0 1 ๏น ๏ฉ0.2878 ๏น ๏ฉ0.8633๏น a ๏บ๏บ ๏ช๏ช0.2878 ๏บ๏บ = ๏ช๏ช 0 ๏บ๏บ per unit a 2 ๏บ๏ป ๏ช๏ซ0.2878 ๏บ๏ป ๏ช๏ซ 0 ๏บ๏ป 239 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 10.18 The zero sequence network is the same as in Problem 10.1. The ๏ − Y transformer phase shifts have no effect on the fault currents and no effect on the voltages at the voltages at the fault bus. Therefore, from the results of Problem 10.10: ๏ฉ I A๏ข๏ข ๏น ๏ฉ − j10.43๏น ๏ฉ − j 7.871๏น ๏ช ๏ข๏ข ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช I B ๏บ = ๏ช 0 ๏บ per unit = ๏ช 0 ๏บ kA ๏ช I C๏ข๏ข ๏บ ๏ช๏ซ 0 ๏บ๏ป ๏ช๏ซ 0 ๏บ๏ป ๏ซ ๏ป ๏ฉVAg ๏น ๏ฉ 0 ๏น ๏ช ๏บ ๏ช ๏บ ๏ชVBg ๏บ = ๏ช0.9502๏247.0๏ฐ๏บ per unit ๏ช ๏บ ๏ช 0.9502๏113.0๏ฐ ๏บ ๏ป ๏ช๏ซVCg ๏บ๏ป ๏ซ Contributions to the fault from generator 1: From the zero-sequence network: I G1− 0 = 0 From the positive sequence network, using current division: ๏ฆ .1727 ๏ถ I G1−1 = ( − j 3.4766 ) ๏ง ๏ท ๏ − 30๏ฐ ๏จ .28 + .1727 ๏ธ = 1.326๏ − 120๏ฐ per unit From the negative sequence network, using current division: ๏ฆ .1802 ๏ถ I G1− 2 = ( − j 3.4766 ) ๏ง ๏ท ๏ + 30๏ฐ ๏จ .28 + .1802 ๏ธ = 1.3615๏ − 60๏ฐ per unit 240 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Transforming to the phase domain: ๏ฉ I G๏ข๏ข1− A ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I G1− B ๏บ = ๏ช1 a ๏ช I G๏ข๏ข1−C ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น๏ฉ 0 ๏น ๏ฉ2.328๏ − 89.6๏ฐ๏น ๏บ ๏ช a ๏บ ๏ช1.326๏ − 120๏ฐ๏บ๏บ = ๏ช๏ช2.328๏89.6๏ฐ ๏บ๏บ per unit a 2 ๏บ๏ป ๏ช๏ซ 1.326๏ − 60๏ฐ ๏บ๏ป ๏ช๏ซ0.036๏180๏ฐ ๏บ๏ป ๏ฉ1.757๏ − 89.6๏ฐ๏น = ๏ช๏ช1.757๏89.6๏ฐ ๏บ๏บ kA ๏ช๏ซ0.027๏180๏ฐ ๏บ๏ป 10.19 (a) Bolted single-line-to-ground fault at bus 1. I 0 = I1 = I 2 = = VF Z 0 + Z1 + Z 2 1.0 ๏0๏ฐ 1.0 ๏0๏ฐ = j (.08158 + .1223 + .1247 ) j 0.3286 = − j 3.043 per unit ๏ฉ I A๏ข๏ข ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I B ๏บ = ๏ช1 a ๏ช I C๏ข๏ข ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ − j 3.043๏น ๏ฉ − j 9.130 ๏น a ๏บ๏บ ๏ช๏ช − j 3.043๏บ๏บ = ๏ช๏ช 0 ๏บ๏บ per unit a 2 ๏บ๏ป ๏ช๏ซ − j 3.043๏บ๏ป ๏ช๏ซ 0 ๏บ๏ป ๏ฉ − j10.54 ๏น = ๏ช๏ช 0 ๏บ๏บ kA ๏ช๏ซ 0 ๏บ๏ป Using Eq. (10.1): ๏ฉV0 ๏น ๏ฉ 0 ๏น ๏ฉ j.08158 ๏ช ๏บ ๏ช ๏บ ๏ช ๏ช V1 ๏บ = ๏ช1.0 ๏0๏ฐ ๏บ − ๏ช 0 ๏ช๏ซV2 ๏บ๏ป ๏ช๏ซ 0 ๏บ๏ป ๏ช๏ซ 0 ๏ฉ −0.2483๏น = ๏ช๏ช 0.6278 ๏บ๏บ per unit ๏ช๏ซ −0.3795๏บ๏ป ๏ฉVAg ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ชVBg ๏บ = ๏ช1 a ๏ชVCg ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 0 j.1223 0 0 ๏น ๏ฉ − j 3.043๏น 0 ๏บ๏บ ๏ช๏ช − j 3.043๏บ๏บ j.1247 ๏บ๏ป ๏ช๏ซ − j 3.043๏บ๏ป 1 ๏น ๏ฉ −.2483๏น ๏ฉ 0 ๏น ๏บ ๏ช ๏บ ๏ช ๏บ a ๏บ ๏ช .6278 ๏บ = ๏ช0.9485 ๏246.9๏ฐ๏บ per unit a 2 ๏ป๏บ ๏ซ๏ช −.3795๏บ๏ป ๏ช๏ซ 0.9485๏113.1๏ฐ ๏บ๏ป 241 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (b) Single-line-to-ground arcing fault at bus 1. ( 500 ) = 250 ๏ = 2 Z base H 1000 15 ZF = = 0.06 ๏0๏ฐ per unit 250 VF I 0 = I1 = I 2 = Z 0 + Z1 + Z 2 + 3 Z F = 1.0 ๏0๏ฐ 1.0 ๏0๏ฐ = 0.18 + j 0.3286 0.3747๏61.29๏ฐ = 2.669 ๏ − 61.29๏ฐ per unit ๏ฉ I A๏ข๏ข ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I B ๏บ = ๏ช1 a ๏ช I C๏ข๏ข ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ2.669 ๏ − 61.29๏ฐ๏น ๏ฉ8.007 ๏ − 61.29๏ฐ๏น ๏บ per unit๏ด 1.155 a ๏บ๏บ ๏ช๏ช 2.669 ๏ − 61.29๏ฐ๏บ๏บ = ๏ช๏ช 0 ๏บ ๏บ๏ป a 2 ๏บ๏ป ๏ช๏ซ 2.669 ๏ − 61.29๏ฐ๏บ๏ป ๏ช๏ซ 0 ๏ฉ9.246 ๏ − 61.29๏ฐ ๏น ๏บ kA = ๏ช๏ช 0 ๏บ ๏ช๏ซ ๏บ๏ป 0 ๏ฉV0 ๏น ๏ฉ 0 ๏น ๏ฉ j.08158 ๏ช ๏บ ๏ช ๏บ ๏ช ๏ชV1 ๏บ = ๏ช1.0 ๏0๏ฐ ๏บ − ๏ช 0 ๏ชV2 ๏บ ๏ช๏ซ 0 ๏บ๏ป ๏ช๏ซ 0 ๏ซ ๏ป 0 j.1223 0 ๏น ๏ฉ2.669 ๏ − 61.29๏ฐ๏น 0 ๏บ๏บ ๏ช๏ช 2.669 ๏ − 61.29๏ฐ ๏บ๏บ j.1247 ๏บ๏ป ๏ช๏ซ 2.669 ๏ − 61.29๏ฐ๏บ๏ป 0 ๏ฉ0.2177 ๏208.71๏ฐ๏น = ๏ช๏ช 0.7307 ๏ − 12.9๏ฐ ๏บ๏บ per unit ๏ช๏ซ0.3328 ๏208.71๏ฐ๏บ๏ป ๏ฉVAg ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ชVBg ๏บ = ๏ช1 a ๏ช ๏บ ๏ช1 a ๏ช๏ซVCg ๏บ๏ป ๏ซ 1 ๏น ๏ฉ.2177 ๏208.71๏ฐ๏น ๏ฉ0.4804 ๏ − 61.29๏ฐ๏น a ๏บ๏บ ๏ช๏ช .7307 ๏ − 12.4๏ฐ ๏บ๏บ = ๏ช๏ช0.9094 ๏244.0๏ฐ ๏บ๏บ per unit ๏บ๏ป a 2 ๏บ๏ป ๏ช๏ซ .3328๏208.71๏ฐ ๏บ๏ป ๏ช๏ซ1.009 ๏113.6๏ฐ (c) I1 = − I 2 = = VF Z1 + Z 2 1.0 ๏0๏ฐ = − j 4.0486 j ( 0.1223 + 0.1247 ) 242 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฉ I A๏ข๏ข ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I B ๏บ = ๏ช1 a ๏ช I C๏ข๏ข ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น๏ฉ 0 0 ๏น ๏ฉ ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช − j 4.0486 ๏บ = ๏ช 7.012 ๏ 180๏ฐ๏บ๏บ per unit๏ด 1.155 a 2 ๏บ๏ป ๏ช๏ซ + j 4.0486 ๏บ๏ป ๏ช๏ซ 7.012 ๏0๏ฐ ๏บ๏ป ๏ฉ 0๏ฐ ๏น = ๏ช๏ช −8.097 ๏บ๏บ kA ๏ช๏ซ 8.097 ๏บ๏ป ๏ฉV0 ๏น ๏ฉ 0 ๏น ๏ฉ j.08158 ๏ช ๏บ ๏ช ๏บ ๏ช ๏ช V1 ๏บ = ๏ช1.0 ๏0๏ฐ๏บ − ๏ช 0 ๏ช๏ซV2 ๏บ๏ป ๏ช๏ซ 0 ๏บ๏ป ๏ช๏ซ 0 0 j.1223 0 0 ๏น๏ฉ 0 ๏น ๏บ ๏ช 0 ๏บ ๏ช − j 4.0486 ๏บ๏บ j.1247 ๏บ๏ป ๏ช๏ซ + j 4.0486๏บ๏ป ๏ฉ 0 ๏น = ๏ช๏ช0.5049 ๏บ๏บ per unit ๏ช๏ซ0.5049 ๏บ๏ป ๏ฉVAg ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ชVBg ๏บ = ๏ช1 a ๏ชVCg ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ 0 ๏น ๏ฉ1.010 ๏0๏ฐ ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช.5049 ๏บ = ๏ช 0.5049 ๏180๏ฐ๏บ๏บ per unit a 2 ๏บ๏ป ๏ช๏ซ.5049 ๏บ๏ป ๏ช๏ซ 0.5049 ๏180๏ฐ๏บ๏ป (d) I1 = VF Z1 + Z 2 // Z 0 = 1.0 ๏0๏ฐ j (.1223 + .1247//.0816 ) = 1.0 ๏0๏ฐ j 0.1716 = − j 5.827 per unit ๏ฆ Z0 ๏ถ ๏ฆ .08158 ๏ถ I 2 = − I1 ๏ง ๏ท = j 5.827 ๏ง ๏ท ๏จ .2063 ๏ธ ๏จ Z0 + Z2 ๏ธ I 2 = j 2.304 per unit ๏ฆ Z2 ๏ถ ๏ฆ .1247 ๏ถ I 0 = − I1 ๏ง ๏ท = j 5.827 ๏ง ๏ท = j 3.523 per unit ๏จ .2063 ๏ธ ๏จ Z0 + Z2 ๏ธ 243 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฉ I A๏ข๏ข ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I B ๏บ = ๏ช1 a ๏ช I C๏ข๏ข ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ j 3.523 ๏น ๏ฉ 0 ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช − j 5.827๏บ = ๏ช8.804 ๏143.1๏ฐ๏บ๏บ per unit๏ด 1.155 a 2 ๏บ๏ป ๏ช๏ซ j 2.304 ๏บ๏ป ๏ช๏ซ 8.304๏36.9๏ฐ ๏บ๏ป 0๏ฐ ๏ฉ ๏น ๏ช = ๏ช10.17๏143.1๏บ๏บ kA ๏ช๏ซ10.17๏36.9๏ฐ๏บ๏ป ๏ฉV0 ๏น ๏ฉ 0 ๏น ๏ฉ j 0.08158 ๏ช ๏บ ๏ช ๏บ ๏ช 0 ๏ชV1 ๏บ = ๏ช1.0๏0 ๏ฐ๏บ − ๏ช ๏ชV2 ๏บ ๏ช๏ซ 0 ๏บ๏ป ๏ช๏ซ 0 ๏ซ ๏ป 0 j.1223 0 ๏น ๏ฉ j3.523 ๏น ๏บ๏ช ๏บ 0 ๏บ ๏ช− j 5.827๏บ j.1247๏บ๏ป ๏ช๏ซ j 2.304 ๏บ๏ป 0 ๏ฉ0.2874๏น ๏ช ๏บ = ๏ช0.2874๏บ per unit ๏ช๏ซ0.2874๏บ๏ป ๏ฉVAg ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช ๏ชVBg ๏บ = ๏ช1 a 2 ๏ช ๏บ ๏ช1 a ๏ช๏ซVCg ๏บ๏ป ๏ซ 1 ๏น ๏ฉ.2874๏น ๏ฉ0.8622๏0 ๏ฐ๏น ๏บ๏ช ๏บ ๏ช ๏บ a ๏บ ๏ช.2874๏บ = ๏ช 0 ๏บ per unit 2๏บ ๏ช ๏บ๏ป a ๏ป ๏ซ.2874๏บ๏ป ๏ช๏ซ 0 (e) Per unit positive sequence network Per unit negative sequence network The per unit zero sequence network is the same as in Problem 10.1 244 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. The ๏ − Y transformer phase shifts have no effect on the fault currents and no effect on the voltages at the fault bus. Therefore, from the results of Problem 10.19(a), ๏ฉVAg ๏น ๏ฉ ๏ฉI A๏ข๏ข ๏น ๏ฉ− j 9.130๏น 0 ๏ฉ− j10.54๏น ๏น ๏ช ๏บ ๏ช ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏บ ๏ชI B๏ข๏ข๏บ = ๏ช 0 ๏บ per unit= ๏ช 0 ๏บ kA ๏ชVBg ๏บ = ๏ช0.9485๏246.90๏บ per unit ๏ช ๏บ ๏ช0.9485๏113.1 ๏ฐ๏บ ๏ชIC๏ข๏ข ๏บ ๏ช๏ซ 0 ๏บ๏ป ๏ช๏ซ 0 ๏บ๏ป ๏ป ๏ซ ๏ป ๏ช๏ซVCg ๏บ๏ป ๏ซ Contribution to the fault current from generator 1: From the zero-sequence circuit: I G1− 0 = 0 From the positive sequence circuit, using current division: ๏ฆ .2393 ๏ถ IG1−1 = (− j 3.043) ๏ง ๏ท ๏ − 30 ๏ฐ ๏จ .25 + .2393 ๏ธ = 1.488๏ − 120 ๏ฐ per unit Transformer phase shift From the negative sequence circuit, using current division: ๏ฆ .2487 ๏ถ I G1− 2 = (− j 3.043) ๏ง ๏ท ๏ + 30 ๏ฐ ๏จ .25 + .2487 ๏ธ = 1.518๏ − 60 ๏ฐ per unit Transformer phase shift Transforming to the phase domain: ๏ฉI G๏ข๏ข1− A ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ชIG1− B ๏บ = ๏ช1 a ๏ช๏ซI G๏ข๏ข1−C ๏บ๏ป ๏ช๏ซ1 a 1๏น๏ฉ 0 ๏น ๏ฉ2.603๏ − 89.7 ๏ฐ๏น ๏บ ๏ช a ๏บ ๏ช1.488๏ − 120 ๏ฐ๏บ๏บ = ๏ช๏ช 2.603๏89.7 ๏ฐ ๏บ๏บ per unit a 2 ๏บ๏ป ๏ช๏ซ 1.518๏ − 60 ๏ฐ ๏บ๏ป ๏ช๏ซ 0.03๏180 ๏ฐ ๏บ๏ป ๏ฉ3.006๏87.7 ๏ฐ๏น = ๏ช๏ช3.006๏87.7 ๏ฐ๏บ๏บ kA ๏ช๏ซ 0.035๏180 ๏ฐ ๏บ๏ป 10.20 I base H = Sbase 3 Vbase H = 500 3 ( 500 ) = 0.5774 kA Three- phase fault: I 0 = I 2 = 0 I1 = VF 1.0๏0๏ฐ = Z1 j 0.30 = − j 3.333per unit 245 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. I a๏ข๏ข = I1 = − j 3.333per unit = − j1.925 kA Single line-to-ground fault: I 0 = I1 = I 2 = VF 1.0๏0๏ฐ = = − j1.429 per unit Z 0 + Z1 + Z 2 j ( 0.1 + 0.3 + 0.3) I a๏ข๏ข = 3I 0๏ข๏ข = − j 4.286 per unit = − j 2.474 kA Line-to-line fault: I 0 = 0 I1 = − I 2 = VF 1.0๏0๏ฐ = = − j1.667 per unit Z1 + Z 2 j ( 0.3 + 0.3 ) I b๏ข๏ข = ( a 2 − a ) I1 = ( a 2 − a ) ( − j1.667 ) = 2.887๏180๏ฐ per unit I b๏ข๏ข = 1.667๏180๏ฐ kA Double line-to-ground fault: I1 = VF 1.0๏0๏ฐ 1.0 = = = − j 2.667 per unit Z1 + Z 2 Z 0 j ( 0.3 + 0.3 0.1) j 0.375 ๏ฆ Z0 ๏ถ ๏ฆ .1 ๏ถ I 2 = − I1 ๏ง ๏ท = ( j 2.667 ) ๏ง ๏ท = j 0.667 per unit ๏จ .4 ๏ธ ๏จ Z0 + Z2 ๏ธ ๏ฆ Z2 ๏ถ ๏ฆ .3 ๏ถ I 0 = − I1 ๏ง ๏ท = ( j 2.667 ) ๏ง ๏ท = j 2.0 per unit ๏จ .4 ๏ธ ๏จ Z0 + Z2 ๏ธ I B๏ข๏ข = I c + a 2 I1 + aI 2 = 2.0๏90๏ฐ + 2.667๏150๏ฐ + .667๏210๏ฐ = 4.163๏134๏ฐ per unit = 2.404๏134๏ฐ kA 10.21 Bolted single-line-to-ground fault at bus 1. I 0 = I1 = I 2 = = VF Z 0 + Z1 + Z 2 1.0๏0๏ฐ = − j1.372 per unit j ( 0.1919 + 0.267 + 0.27 ) ๏ฉ I A๏ข๏ข ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I B ๏บ = ๏ช1 a ๏ช I C๏ข๏ข ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ − j1.372 ๏น a ๏บ๏บ ๏ช๏ช − j1.372 ๏บ๏บ a 2 ๏บ๏ป ๏ช๏ซ − j1.372 ๏บ๏ป ๏ฉ I A๏ข๏ข ๏น ๏ฉ − j 4.116 ๏น ๏ฉ − j 4.753๏น ๏ช ๏ข๏ข ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช I B ๏บ = ๏ช 0 ๏บ per unit = ๏ช 0 ๏บ kA ๏ช I C๏ข๏ข ๏บ ๏ช๏ซ 0 ๏บ๏ป ๏ช๏ซ 0 ๏บ๏ป ๏ซ ๏ป 246 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Contributions to the fault current Zero sequence: ๏ฆ .9581 ๏ถ Transformer: I T − 0 = − j1.372 ๏ง ๏ท ๏จ .24 + .9581 ๏ธ = − j1.097 per unit .24 ๏ฆ ๏ถ Line: I L −0 = − j1.372 ๏ง ๏ท = − j 0.2748 ๏จ .24 + .9581 ๏ธ Positive sequence: ๏ฆ .4583 ๏ถ Transformer: I T −1 = − j1.372 ๏ง ๏ท ๏จ .64 + .4583 ๏ธ = − j 0.5725 .64 ๏ฆ ๏ถ Line: I L −1 = − j1.372 ๏ง ๏ท = − j 0.7994 ๏จ .64 + .4583 ๏ธ Negative sequence: ๏ฆ .4671 ๏ถ Transformer: I T − 2 = − j1.372 ๏ง ๏ท ๏จ .64 + .4671 ๏ธ = − j 0.5789 per unit .64 ๏ฆ ๏ถ Line: I L − 2 = j1.372 ๏ง ๏ท = − j 0.7931per unit ๏จ .64 + .4671 ๏ธ Transformer: ๏ฉ IT๏ข๏ข− A ๏น ๏ฉ1 1 ๏ช I ๏ข๏ข ๏บ = ๏ช1 a 2 ๏ช T −B ๏บ ๏ช ๏ช๏ซ IT๏ข๏ข−C ๏บ๏ป ๏ช๏ซ1 a 1 ๏น ๏ฉ − j1.097 ๏น ๏ฉ − j 2.248 ๏น ๏ฉ − j 2.596 ๏น ๏บ ๏ช ๏บ ๏ช ๏บ a ๏บ ๏ช − j 0.5725๏บ = ๏ช.521๏ − 89.4๏ฐ ๏บ per unit = ๏ช๏ช.602๏ − 89.4๏ฐ ๏บ๏บ kA ๏ช๏ซ.602๏ − 90.6๏ฐ๏บ๏ป a 2 ๏บ๏ป ๏ช๏ซ − j 0.5789๏บ๏ป ๏ช๏ซ.521๏ − 90.6๏ฐ๏บ๏ป Line: ๏ฉ I L๏ข๏ข− A ๏น ๏ฉ1 1 ๏ช I ๏ข๏ข ๏บ = ๏ช1 a 2 ๏ช L−B ๏บ ๏ช ๏ช๏ซ I L๏ข๏ข−C ๏บ๏ป ๏ช๏ซ1 a 1 ๏น ๏ฉ − j 0.2748 ๏น ๏ฉ − j1.8673 ๏น ๏ฉ − j 2.156 ๏น ๏บ ๏ช ๏บ ๏ช ๏บ a ๏บ ๏ช − j 0.7994 ๏บ = ๏ช.521๏90.6๏ฐ๏บ per unit = ๏ช๏ช.602๏90.6๏ฐ๏บ๏บ kA ๏ช๏ซ.602๏89.4๏ฐ ๏บ๏ป a 2 ๏บ๏ป ๏ช๏ซ − j 0.7931๏บ๏ป ๏ช๏ซ.521๏89.4๏ฐ ๏บ๏ป 10.22 Bolted line-to-line fault at bus 1. I1 = − I 2 = = VF Z1 + Z 2 1.0๏0๏ฐ j (.2670 + .270 ) = − j1.862 per unit 247 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฉ I A๏ข๏ข ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I B ๏บ = ๏ช1 a ๏ช I C๏ข๏ข ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น๏ฉ 0 ๏น ๏ฉ 0 ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช − j1.862 ๏บ = ๏ช3.225๏180๏ฐ๏บ๏บ per unit a 2 ๏บ๏ป ๏ช๏ซ + j1.862 ๏บ๏ป ๏ช๏ซ 3.225๏0๏ฐ ๏บ๏ป ๏ฉ I A๏ข๏ข ๏น ๏ฉ 0 0 ๏น ๏ฉ ๏น ๏ช ๏ข๏ข ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช I B ๏บ = ๏ช3.225๏180๏ฐ๏บ ๏ด 1.155 = ๏ช3.724๏180๏ฐ ๏บ kA ๏ช I C๏ข๏ข ๏บ ๏ช๏ซ 3.225๏0๏ฐ ๏บ๏ป ๏ช๏ซ 3.724๏0๏ฐ ๏บ๏ป ๏ซ ๏ป Contributions to the fault current Zero sequence: IT −0 = I L −0 = 0 Positive sequence: ๏ฆ .4583 ๏ถ Transformer: I T −1 = − j1.862 ๏ง ๏ท ๏จ .64 + .4583 ๏ธ = − j 0.7770 per unit .64 ๏ฆ ๏ถ Line: I L −1 = − j1.862 ๏ง ๏ท = − j1.085per unit ๏จ .64 + .4583 ๏ธ Negative sequence: ๏ฆ .4671 ๏ถ Transformer I T − 2 = j1.862 ๏ง ๏ท ๏จ .64 + .4671 ๏ธ = j 0.7856 per unit .64 ๏ฆ ๏ถ Line I L − 2 = j1.862 ๏ง ๏ท .64 + .4671 ๏จ ๏ธ = j1.076 per unit Contribution to fault from transformer: ๏ฉ I T๏ข๏ข− A ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I T − B ๏บ = ๏ช1 a ๏ช I T๏ข๏ข−C ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ0 ๏น ๏ฉ j.0086 ๏น ๏ฉ 0.0099๏90๏ฐ ๏น ๏บ ๏ช ๏บ ๏ช ๏บ a ๏บ ๏ช − j.777๏บ = ๏ช1.353๏180.2๏ฐ๏บ per unit = ๏ช๏ช1.562๏180.2๏ฐ๏บ๏บ kA ๏ช๏ซ1.562๏ − 0.2๏ฐ ๏บ๏ป a 2 ๏บ๏ป ๏ช๏ซ j.7856 ๏บ๏ป ๏ช๏ซ1.353๏ − 0.2๏ฐ ๏บ๏ป Contribution to fault from line: ๏ฉ I L๏ข๏ข− A ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I L − B ๏บ = ๏ช1 a ๏ช I L๏ข๏ข−C ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ 0 ๏น ๏ฉ − j 0.0086 ๏น ๏ฉ 0.0099๏ − 90๏ฐ๏น ๏บ ๏ช ๏บ ๏ช ๏บ a ๏บ ๏ช − j1.085๏บ = ๏ช1.871๏179.9๏ฐ๏บ per unit = ๏ช๏ช 2.160๏179.9๏ฐ ๏บ๏บ kA ๏ช๏ซ 2.160๏0.1๏ฐ ๏บ๏ป a 2 ๏บ๏ป ๏ช๏ซ j1.076 ๏บ๏ป ๏ช๏ซ 1.871๏0.1๏ฐ ๏บ๏ป 248 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 10.23 Bolted double-line-to-ground fault at bus 1. VF = 1.0๏0๏ฐ I1 = VF Z1 + Z 2 Z 0 I1 = 1.0๏0๏ฐ j (.267 + .27 .1919 ) = 1.0๏0๏ฐ j 0.3792 = − j 2.637 per unit ๏ฆ Z0 ๏ถ ๏ฆ .1919 ๏ถ I 2 = − I1 ๏ง ๏ท = j 2.637 ๏ง ๏ท ๏จ .27 + .1919 ๏ธ ๏จ Z0 + Z2 ๏ธ I 2 = j1.096 per unit ๏ฆ Z2 ๏ถ .27 ๏ฆ ๏ถ I 0 = − I1 ๏ง ๏ท = j 2.637 ๏ง ๏ท ๏จ .27 + .1919 ๏ธ ๏จ Z0 + Z2 ๏ธ I 0 = j1.541per unit ๏ฉ I A๏ข๏ข ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I B ๏บ = ๏ช1 a ๏ช I C๏ข๏ข ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ j1.541 ๏น ๏ฉ 0 ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช − j 2.637 ๏บ = ๏ช 3.975๏144.3๏ฐ ๏บ๏บ per unit๏ด 1.155 a 2 ๏บ๏ป ๏ช๏ซ j1.096 ๏บ๏ป ๏ช๏ซ3.975๏35.57๏ฐ๏บ๏ป 0 ๏ฉ ๏น ๏ช = ๏ช 4.590๏144.3๏ฐ ๏บ๏บ kA ๏ช๏ซ 4.590๏35.57๏ฐ๏บ๏ป Contributions to the fault current Zero sequence: ๏ฆ .9581 ๏ถ Transformer: I T − 0 = j1.541๏ง ๏ท ๏จ .24 + .9581 ๏ธ = j1.232 per unit .24 ๏ฆ ๏ถ Line: I L −0 = j1.541๏ง ๏ท = j 0.3087 per unit .24 + .9581 ๏จ ๏ธ Positive sequence: ๏ฆ .4583 ๏ถ I T −1 = ( − j 2.637 ) ๏ง ๏ท = − j1.100 ๏จ .64 + .4583 ๏ธ .64 ๏ฆ ๏ถ I L −1 = ( − j 2.637 ) ๏ง ๏ท = − j1.537 per unit ๏จ .64 + .4583 ๏ธ 249 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Negative Sequence: ๏ฆ .4671 ๏ถ I T − 2 = ( j1.096 ) ๏ง ๏ท = j 0.4624 ๏จ .64 + .4671 ๏ธ .64 ๏ฆ ๏ถ I L − 2 = ( j1.096 ) ๏ง ๏ท = j 0.6336 .64 + .4671 ๏จ ๏ธ Contribution to fault from transformer: ๏ฉ I T๏ข๏ข− A ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I T − B ๏บ = ๏ช1 a ๏ช I T๏ข๏ข−C ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ j1.232 ๏น ๏ฉ j 0.5944 ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช − j1.10 ๏บ = ๏ช 2.058๏131.1๏ฐ ๏บ๏บ per unit๏ด 1.155 a 2 ๏บ๏ป ๏ช๏ซ j 0.4624 ๏บ๏ป ๏ช๏ซ 2.058๏48.90๏ฐ๏บ๏ป ๏ฉ 0.6864๏90๏ฐ ๏น = ๏ช๏ช 2.376๏131.1๏ฐ ๏บ๏บ kA ๏ช๏ซ2.376๏48.90๏ฐ๏บ๏ป Contributions to fault from line: ๏ฉ I L๏ข๏ข− A ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I L − B ๏บ = ๏ช1 a ๏ช I L๏ข๏ข−C ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ j.3087 ๏น ๏ฉ − j.594 ๏น a ๏บ๏บ ๏ช๏ช − j1.537 ๏บ๏บ = ๏ช๏ช2.028๏158.0๏ฐ๏บ๏บ per unit๏ด 1.155 a 2 ๏บ๏ป ๏ช๏ซ j.6336 ๏บ๏ป ๏ช๏ซ 2.028๏22.0๏ฐ ๏บ๏ป ๏ฉ0.686๏ − 90๏ฐ ๏น = ๏ช๏ช 2.342๏158๏ฐ ๏บ๏บ kA ๏ช๏ซ 2.342๏22๏ฐ ๏บ๏ป 10.24 Bolted single-line-to-ground fault at bus 1. VF = 1.0๏0๏ฐ I 0 = I1 = I 2 = = VF Z 0 + Z1 + Z 2 1.0๏0๏ฐ j (1.3502 + 0.3542 + 0.3586 ) = − j 0.4847 per unit I base 1 = ๏ฉ I A๏ข๏ข ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I B ๏บ = ๏ช1 a ๏ช I C๏ข๏ข ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 100 10 3 = 5.774 kA 1 ๏น ๏ฉ − j.4847๏น ๏ฉ − j1.454 ๏น ๏ฉ − j8.396 ๏น ๏บ ๏ช ๏บ ๏ช ๏บ a ๏บ ๏ช − j.4847๏บ = ๏ช 0 ๏บ per unit๏ด 5.774 = ๏ช๏ช 0 ๏บ๏บ kA ๏ช๏ซ 0 ๏บ๏ป a 2 ๏บ๏ป ๏ช๏ซ − j.4847๏บ๏ป ๏ช๏ซ 0 ๏บ๏ป 250 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Contributions to fault current Zero sequence: Generator G1 I G1− 0 = 0 Transformer T1 I T 1− 0 = − j 0.4847 per unit Positive sequence: ๏ฆ .92 ๏ถ Generator G1 I G1−1 = − j.4847 ๏ง ๏ท ๏จ .92 + .576 ๏ธ = − j 0.2981per unit ๏ฆ .576 ๏ถ Transformer T1 IT 1−1 = − j.4847 ๏ง ๏ท = − j 0.1866 per unit ๏จ .92 + .576 ๏ธ Negative sequence: ๏ฆ .95 ๏ถ Generator G1 I G1− 2 = − j.4847 ๏ง ๏ท ๏จ .95 + .576 ๏ธ = − j 0.3017 per unit ๏ฆ .576 ๏ถ Transformer T1 I T 1− 2 = − j.4847 ๏ง ๏ท ๏จ .576 + .95 ๏ธ = − j.1830 Contribution to fault from generator G1: ๏ฉ I G๏ข๏ข1− A ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I G1− B ๏บ = ๏ช1 a ๏ช I G๏ข๏ข1−C ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ0 ๏น ๏ฉ − j 0.5998 ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช − j.2981 ๏บ = ๏ช 0.2999๏89.4๏ฐ ๏บ๏บ per unit๏ด 5.774 a 2 ๏บ๏ป ๏ช๏ซ − j.3017 ๏บ๏ป ๏ช๏ซ 0.2999๏90.6๏ฐ๏บ๏ป ๏ฉ3.463๏ − 90๏ฐ ๏น = ๏ช๏ช 1.731๏89.4๏ฐ ๏บ๏บ kA ๏ช๏ซ 1.731๏90.6๏ฐ ๏บ๏ป Contribution to fault from transformer T1: ๏ฉ I T๏ข๏ข1− A ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I T 1− B ๏บ = ๏ช1 a ๏ช I T๏ข๏ข1−C ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ − j.4847 ๏น ๏ฉ − j.8543 ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช − j.1866 ๏บ = ๏ช0.2999๏ − 90.6๏ฐ๏บ๏บ per unit๏ด 5.774 a 2 ๏บ๏ป ๏ช๏ซ − j.1830 ๏บ๏ป ๏ช๏ซ 0.2999๏ − 89.4๏ฐ ๏บ๏ป ๏ฉ 4.932๏ − 90๏ฐ ๏น = ๏ช๏ช1.731๏ − 90.6๏ฐ ๏บ๏บ kA ๏ช๏ซ1.731๏ − 89.4๏ฐ ๏บ๏ป 251 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 10.25 Arcing single-line-to-ground fault at bus 1. VF = 1.0๏0๏ฐ VF Z 0 + Z1 + Z 2 + 3 Z F I 0 = I1 = I 2 = = 1.0๏0๏ฐ j ( 0.3 + 1.3502 + .3542 + .3586 ) = 0.4232๏ − 90๏ฐ per unit ๏ฉ I A๏ข๏ข ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ช I B๏ข๏ข ๏บ = ๏ช1 a ๏ช I C๏ข๏ข ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ0.4232๏ − 90๏ฐ๏น ๏ฉ1.270๏ − 90๏ฐ๏น ๏บ per unit๏ด 5.774 a ๏บ๏บ ๏ช๏ช0.4232๏ − 90๏ฐ๏บ๏บ = ๏ช๏ช 0 ๏บ ๏บ๏ป a 2 ๏บ๏ป ๏ช๏ซ0.4232๏ − 90๏ฐ๏บ๏ป ๏ช๏ซ 0 ๏ฉ7.331๏ − 90๏ฐ ๏น ๏บ kA = ๏ช๏ช 0 ๏บ ๏ช๏ซ ๏บ๏ป 0 Contributions to fault current Zero sequence: Generator G1: I G1− 0 = 0 Transformer T1: IT 1−0 = 0.4232๏ − 90๏ฐ per unit Positive sequence: ๏ฆ .92 ๏ถ Generator G1: I G1−1 = .4232๏ − 90๏ฐ ๏ง ๏ท ๏จ .92 + .576 ๏ธ = 0.2603๏ − 90๏ฐ ๏ฆ .576 ๏ถ Transformer T1: IT 1−1 = .4232๏ − 90๏ฐ ๏ง ๏ท ๏จ .92 + .576 ๏ธ = 0.1629๏ − 90๏ฐ per unit Negative sequence: 252 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฆ .95 ๏ถ Generator G1: I G1− 2 = .4232๏ − 90๏ฐ ๏ง ๏ท ๏จ .576 + .95 ๏ธ = 0.2635๏ − 90๏ฐ ๏ฆ .576 ๏ถ Transformer T1: IT 1− 2 = .4232๏ − 90๏ฐ ๏ง ๏ท ๏จ .576 + .95 ๏ธ = 0.1597๏ − 90๏ฐ per unit Contribution to fault from generator G1: ๏ฉ I G๏ข๏ข1− A ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ช I G๏ข๏ข1− B ๏บ = ๏ช1 a ๏ช I G๏ข๏ข1−C ๏บ ๏ซ๏ช1 a ๏ซ ๏ป 1 ๏น๏ฉ 0 ๏น ๏ฉ .5238๏ − 90๏ฐ ๏น ๏บ ๏ช a ๏บ ๏ช 0.2603๏ − 90๏ฐ ๏บ๏บ = ๏ช๏ช.2619๏89.40๏ฐ ๏บ๏บ per unit๏ด 5.774 a 2 ๏ป๏บ ๏ซ๏ช0.2635๏ − 90๏ฐ๏ป๏บ ๏ซ๏ช.2619๏90.61๏ฐ๏ป๏บ ๏ฉ 3.0244๏ − 90๏ฐ ๏น = ๏ช๏ช1.5123๏89.40๏ฐ ๏บ๏บ kA ๏ช๏ซ1.5123๏90.61๏ฐ๏บ๏ป Contribution to fault from generator T1: ๏ฉ IT๏ข๏ข1− A ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ช IT๏ข๏ข1− B ๏บ = ๏ช1 a ๏ช IT๏ข๏ข1−C ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ.4232๏ − 90๏ฐ ๏น ๏ฉ 0.7458๏ − 90๏ฐ ๏น a ๏บ๏บ ๏ช๏ช.1629๏ − 90๏ฐ ๏บ๏บ = ๏ช๏ช0.2916๏ − 90.61๏ฐ ๏บ๏บ per unit๏ด 5.774 a 2 ๏บ๏ป ๏ช๏ซ.1597๏ − 90๏ฐ๏บ๏ป ๏ช๏ซ 0.2916๏ − 89.40๏ฐ ๏บ๏ป ๏ฉ 4.3063๏ − 90๏ฐ ๏น = ๏ช๏ช1.5123๏ − 90.61๏ฐ ๏บ๏บ kA ๏ช๏ซ1.5123๏ − 89.40๏ฐ ๏ป๏บ 10.26 Bolted line-to-line fault at bus 1. I1 = − I 2 = = VF Z1 + Z 2 1.0๏0๏ฐ j (.3542 + .3586 ) = − j1.403per unit ๏ฉ I A๏ข๏ข ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I B ๏บ = ๏ช1 a ๏ช I C๏ข๏ข ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น๏ฉ 0 ๏น ๏ฉ 0 ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช − j1.403๏บ = ๏ช2.430๏180๏ฐ๏บ๏บ per unit๏ด 5.744 a 2 ๏บ๏ป ๏ช๏ซ + j1.403๏บ๏ป ๏ช๏ซ 2.430๏0๏ฐ ๏บ๏ป 0 ๏ฉ ๏น ๏ช = ๏ช14.03๏180๏ฐ ๏บ๏บ kA ๏ช๏ซ 14.03๏0๏ฐ ๏บ๏ป 253 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Contributions to fault current. Zero sequence: Generator G1: I G1− 0 = 0 Transformer T1: I T 1− 0 = 0 Positive sequence: ๏ฆ .92 ๏ถ Generator G1: I G1−1 = − j1.403 ๏ง ๏ท ๏จ .92 + .576 ๏ธ = − j 0.8628 per unit ๏ฆ .576 ๏ถ Transformer T1: I T 1−1 = − j1.403 ๏ง ๏ท = − j 0.5402 ๏จ .576 + .92 ๏ธ Negative sequence: ๏ฆ .95 ๏ถ Generator G1: I G1− 2 = ( j1.403 ) ๏ง ๏ท ๏จ .95 + .576 ๏ธ = j 0.8734 per unit ๏ฆ .576 ๏ถ Transformer T1: I T 1− 2 = ( j1.403 ) ๏ง ๏ท ๏จ .576 + .95 ๏ธ = j 0.5296 per unit Contribution to fault from generator G1: ๏ฉ I G๏ข๏ข1− A ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I G1− B ๏บ = ๏ช1 a ๏ช I G๏ข๏ข1−C ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น๏ฉ 0 ๏น ๏ฉ j 0.0106 ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช − j.8628 ๏บ = ๏ช1.504๏ − 179.8๏ฐ๏บ๏บ per unit๏ด 5.774 a 2 ๏บ๏ป ๏ช๏ซ j.8734 ๏บ๏ป ๏ช๏ซ 1.504๏ − 0.2๏ฐ ๏บ๏ป ๏ฉ 0.0612๏90๏ฐ ๏น = ๏ช๏ช8.683๏ − 179.8๏ฐ ๏บ๏บ kA ๏ช๏ซ 8.683๏ − 0.2๏ฐ ๏บ๏ป Contribution to fault from transformer T1: ๏ฉ I T๏ข๏ข1− A ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I T 1− B ๏บ = ๏ช1 a ๏ช I T๏ข๏ข1−C ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ 0 ๏น ๏ฉ − j 0.0106 ๏น a ๏บ๏บ ๏ช๏ช − j.5402 ๏บ๏บ = ๏ช๏ช0.9265๏179.7๏ฐ๏บ๏บ per unit๏ด 5.774 a 2 ๏บ๏ป ๏ช๏ซ j.5296 ๏บ๏ป ๏ช๏ซ 0.9265๏0.33๏ฐ ๏บ๏ป ๏ฉ0.0612๏ − 90๏ฐ๏น = ๏ช๏ช 5.349๏179.7๏ฐ ๏บ๏บ kA ๏ช๏ซ 5.349๏0.33๏ฐ ๏บ๏ป 10.27 Bolted double-line to-ground fault at bus 1. 254 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. I1 = VF Z1 + Z 2 Z 0 = 1.0๏0๏ฐ j (.3542 + .3586 1.3502 ) = 1.0๏0๏ฐ j 0.6375 = − j1.569 per unit ๏ฆ Z2 ๏ถ .3586 ๏ฆ ๏ถ I 0 = − I1 ๏ง ๏ท = j1.569 ๏ง ๏ท ๏จ .3586 + 1.3502 ๏ธ ๏จ Z2 + Z0 ๏ธ = j 0.3292 per unit ๏ฆ Z0 ๏ถ 1.3502 ๏ฆ ๏ถ I 2 = − I1 ๏ง ๏ท = j1.569 ๏ง ๏ท ๏จ 1.3502 + .3586 ๏ธ ๏จ Z0 + Z2 ๏ธ = j1.2394 per unit ๏ฉ I A๏ข๏ข ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I B ๏บ = ๏ช1 a ๏ช I C๏ข๏ข ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ j 0.3292 ๏น ๏ฉ 0 ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช − j1.569 ๏บ = ๏ช 2.482๏168.5๏ฐ๏บ๏บ per unit๏ด 5.774 a 2 ๏บ๏ป ๏ช๏ซ j1.2394 ๏บ๏ป ๏ช๏ซ 2.482๏11.48๏ฐ๏บ๏ป 0 ๏ฉ ๏น ๏ช = ๏ช14.33๏168.5๏ฐ ๏บ๏บ kA ๏ช๏ซ14.33๏11.48๏ฐ๏บ๏ป Contributions to fault current. Zero sequence: Generator G1: I G1− 0 = 0 Transformer T1: I T 1−0 = j 0.3292 per unit Positive sequence: ๏ฆ .92 ๏ถ Generator G1: I G1−1 = − j1.569 ๏ง ๏ท ๏จ .92 + .576 ๏ธ = − j 0.9646 per unit ๏ฆ .576 ๏ถ Transformer T1: I T 1−1 = − j1.569 ๏ง ๏ท ๏จ .576 + .92 ๏ธ = − j 0.6039 per unit Negative sequence: 255 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฆ .95 ๏ถ Generator G1: I G1− 2 = j1.2394 ๏ง ๏ท ๏จ .95 + .576 ๏ธ = j 0.7716 per unit ๏ฆ .576 ๏ถ Transformer T1: IT 1−2 = j1.2394 ๏ง ๏ท = j 0.4678 per unit ๏จ .576 + .95 ๏ธ Contribution to fault from generator G1: ๏ฉ I G๏ข๏ข1− A ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I G1− B ๏บ = ๏ช1 a ๏ช I G๏ข๏ข1−C ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ 0 ๏น ๏ฉ − j 0.193 ๏น a ๏บ๏บ ๏ช๏ช − j.9646 ๏บ๏บ = ๏ช๏ช1.507๏176.3๏ฐ๏บ๏บ per unit๏ด 5.774 a 2 ๏บ๏ป ๏ช๏ซ j.7716 ๏บ๏ป ๏ช๏ซ 1.507๏3.67๏ฐ ๏บ๏ป ๏ฉ 1.114๏ − 90๏ฐ ๏น = ๏ช๏ช8.701๏176.3๏ฐ๏บ๏บ kA ๏ช๏ซ 8.701๏3.67๏ฐ ๏บ๏ป Contribution to fault from transformer T1: ๏ฉ I T๏ข๏ข1− A ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I T 1− B ๏บ = ๏ช1 a ๏ช I T๏ข๏ข1−C ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ j 0.3292 ๏น ๏ฉ j 0.1931 ๏น a ๏บ๏บ ๏ช๏ช − j 0.6039 ๏บ๏บ = ๏ช๏ช1.010๏156.8๏ฐ ๏บ๏บ per unit๏ด 5.774 a 2 ๏บ๏ป ๏ช๏ซ j 0.4678 ๏บ๏ป ๏ช๏ซ1.010๏23.17๏ฐ๏บ๏ป ๏ฉ 1.114๏90๏ฐ ๏น = ๏ช๏ช 5.831๏156.8๏ฐ ๏บ๏บ kA ๏ช๏ซ5.831๏23.17๏ฐ๏บ๏ป 10.28 I a = ( I 0 + I1 + I 2 ) = 0 I a๏ข = ( I 0๏ข + I1๏ข + I 2๏ข ) = 0 Also Vbb๏ข = Vcc๏ข = 0, or ๏ฉV00๏ข ๏น ๏ฉ1 1 ๏ชV ๏บ = 1 ๏ช1 a ๏ช 11๏ข ๏บ 3 ๏ช ๏ช๏ซV22๏ข ๏บ๏ป ๏ช๏ซ1 a 2 1 ๏น ๏ฉVaa๏ข ๏น ๏ฉVaa๏ข / 3๏น ๏ช ๏บ ๏ช ๏บ a 2 ๏บ๏บ ๏ช 0 ๏บ = ๏ชVaa๏ข / 3๏บ a ๏บ๏ป ๏ช๏ซ 0 ๏บ๏ป ๏ช๏ซVaa๏ข / 3๏บ๏ป Which gives V00๏ข = V11๏ข = V22๏ข = 0 256 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 10.29 I b = I c = 0, or ๏ฉI0 ๏น ๏ฉ1 1 ๏ช ๏บ 1๏ช ๏ช I1 ๏บ = 3 ๏ช1 a ๏ชI2 ๏บ ๏ช๏ซ1 a 2 ๏ซ ๏ป 1 ๏น ๏ฉ I a ๏น ๏ฉ I a / 3๏น ๏ช ๏บ ๏ช ๏บ a 2 ๏บ๏บ ๏ช 0 ๏บ = ๏ช I a / 3๏บ ๏ I 0 = I1 = I 2 a ๏บ๏ป ๏ช๏ซ 0 ๏บ๏ป ๏ช๏ซ I a / 3๏บ๏ป Similarly I 0๏ข = I1๏ข = I 2๏ข Also Vaa๏ข = (V00๏ข + V11๏ข + V22๏ข ) = 0 10.30 (a) For a single line-to-ground fault, the sequence networks from the solution of Problem 10.10 are to be connected in series. The sequence currents are given by I 0 = I1 = I 2 = 1 = 1.65๏ − 90๏ฐ pu j ( 0.26 + 0.2085 + 0.14 ) The subtransient fault current is I a = 3 (1.65๏ − 90๏ฐ ) = 4.95๏ − 90๏ฐ pu Ib = Ic = 0 The sequence voltages are given by Eq. (10.1.1): V1 = 1๏0๏ฐ − I1 Z1 = 1๏0๏ฐ − (1.65๏ − 90๏ฐ )( 0.26๏90๏ฐ ) = 0.57 pu V2 = − I 2 Z 2 = − (1.65๏ − 90๏ฐ )( 0.2085๏90๏ฐ ) = −0.34 pu V0 = − I 0 Z 0 = − (1.65๏ − 90๏ฐ )( 0.14๏90๏ฐ ) = −0.23pu The line-to-ground (phase) voltages at the faulted bus are ๏ฉVag ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ชVbg ๏บ = ๏ช1 a ๏ช ๏บ ๏ช1 a ๏ช๏ซVcg ๏บ๏ป ๏ซ 1 ๏น ๏ฉ −0.23 ๏น ๏ฉ 0 ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช 0.57 ๏บ = ๏ช0.86๏ − 113.64๏ฐ๏บ๏บ pu a 2 ๏บ๏ป ๏ช๏ซ −0.34 ๏บ๏ป ๏ช๏ซ 0.86๏113.64๏ฐ ๏บ๏ป 257 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (b) For a line-to-line fault through a fault impedance Z F = j 0.05, the sequence network connection is shown below: I1 = − I 2 = 1๏0๏ฐ = 1.93๏ − 90๏ฐ pu 0.5185๏90๏ฐ I0 = 0 The phase currents are given by (Eq. 8.1.20 ๏พ 8.1.22) I a = 0; I b = −I c = ( a2 − a ) I1 = 3.34๏ − 180๏ฐ pu The sequence voltages are V1 = 1๏0๏ฐ − I1 Z1 = 1๏0๏ฐ − (1.93๏ − 90๏ฐ )( 0.26๏90๏ฐ ) = 0.5pu V2 = − I 2 Z 2 = − ( −1.93๏ − 90๏ฐ )( 0.2085๏90๏ฐ ) = 0.4 pu V0 = − I 0 Z 0 = 0 The phase voltages are then given by Va = V1 + V2 + V0 = 0.9 pu Vb = a 2V1 + aV2 + V0 = 0.46๏ − 169.11๏ฐ pu Vc = aV1 + a 2V2 + V0 = 0.46๏169.11๏ฐ pu Check: Vb − Vc = I b Z F = 0.17๏ − 90๏ฐ (c) For a double line-to-ground fault with given conditions, the sequence network connection is shown below: The reductions are shown below: 258 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ I1 = 1๏0๏ฐ / 0.45๏90๏ฐ = 2.24๏ − 90๏ฐ 0.29 ๏ฆ ๏ถ I 2 = − I1 ๏ง ๏ท = −1.18๏ − 90๏ฐ ๏จ 0.29 + 0.2585 ๏ธ I 0 = −1.06๏ − 90๏ฐ The sequence voltages are given by V1 = 1๏0๏ฐ − I1 Z1 = 1๏0๏ฐ − ( 2.24๏ − 90๏ฐ )( 0.26๏90๏ฐ ) = 0.42 V2 = − I 2 Z 2 = − ( −1.18๏ − 90๏ฐ )( 0.2085๏90๏ฐ ) = 0.25 V0 = − I 0 Z 0 = − ( −1.06๏ − 90๏ฐ )( 0.14๏90๏ฐ ) = 0.15 The phase currents are calculated as I a = 0; I b = a 2 I1 + aI 2 + I 0 = 3.36๏151.77๏ฐ; I c = aI1 + a 2 I 2 + I 0 = 3.36๏28.23๏ฐ. The neutral fault current is I b + I c = 3I 0 = −3.18๏ − 90๏ฐ. The phase voltages are obtained as Va = V1 + V2 + V0 = 0.82 Vb = a 2V1 + aV2 + V0 = 0.24๏ − 141.49๏ฐ Vc = aV1 + a 2V2 + V0 = 0.24๏141.49๏ฐ 10.31 (a) For a single line-to-ground fault at bus 3, the interconnection of the sequence networks is shown below. (See solution of Problem 10.12) 259 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. I 0 = I1 = I 2 = ๏ฉ I a ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ช I b ๏บ = ๏ช1 a ๏ช I c ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1๏0๏ฐ = − j1.82 j ( 0.199 + 0.175 + 0.175 ) 1 ๏น ๏ฉ − j1.82 ๏น ๏ฉ − j 5.46 ๏น a ๏บ๏บ ๏ช๏ช − j1.82 ๏บ๏บ = ๏ช๏ช 0 ๏บ๏บ a 2 ๏บ๏ป ๏ช๏ซ − j1.82 ๏บ๏ป ๏ช๏ซ 0 ๏บ๏ป Sequence voltages are given by V0 = − j 0.199 ( − j1.82 ) = −0.362; V1 = 1 − j 0.175 ( − j1.82 ) = 0.681; V2 = − j 0.175 ( − j1.82 ) = −0.319 The phase voltages are calculated as ๏ฉVa ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ชVb ๏บ = ๏ช1 a ๏ชVc ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ −0.362 ๏น ๏ฉ 0 ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช 0.681 ๏บ = ๏ช1.022๏238๏ฐ๏บ๏บ a 2 ๏บ๏ป ๏ช๏ซ −0.319 ๏บ๏ป ๏ช๏ซ1.022๏122๏ฐ ๏บ๏ป (b) For a line-to-line fault at bus 3, the sequence networks are interconnected as shown below: I1 = − I 2 = 1๏0๏ฐ = − j 2.86 j 0.175 + j 0.175 Phase currents are then ๏ฉ I a ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ช I b ๏บ = ๏ช1 a ๏ช I c ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น๏ฉ 0 ๏น ๏ฉ 0 ๏น a ๏บ๏บ ๏ช๏ช − j 2.86 ๏บ๏บ = ๏ช๏ช −4.95๏บ๏บ a 2 ๏บ๏ป ๏ช๏ซ j 2.86 ๏บ๏ป ๏ช๏ซ 4.95 ๏บ๏ป The sequence voltages are V0 = 0; V1 = V2 = I1 ( j 0.175 ) = 0.5 Phase voltages are calculated as ๏ฉVa ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ชVb ๏บ = ๏ช1 a ๏ชVc ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ 0 ๏น ๏ฉ 1.0 ๏น a ๏บ๏บ ๏ช๏ช 0.5๏บ๏บ = ๏ช๏ช −0.5๏บ๏บ a 2 ๏บ๏ป ๏ช๏ซ 0.5๏บ๏ป ๏ช๏ซ −0.5๏บ๏ป 260 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (c) For a double line-to-ground fault at bus 3, the sequence network interconnection is shown below: Sequence currents are calculated as I1 = 1๏0๏ฐ = − j 3.73 j 0.175 + ๏ฉ๏ซ j 0.175 ( j 0.199 ) / ( j 0.175 + j 0.199 ) ๏น๏ป 0.199 ( j3.73) = j1.99 0.175 + 0.199 0.175 I0 = ( j3.73) = j1.75 0.175 + 0.199 I2 = Phase currents are given by ๏ฉ I a ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ช I b ๏บ = ๏ช1 a ๏ช I c ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ j1.75 ๏น ๏ฉ 0 ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช − j 3.73๏บ = ๏ช 5.6๏152.1๏ฐ๏บ๏บ a 2 ๏บ๏ป ๏ช๏ซ j1.99 ๏บ๏ป ๏ช๏ซ 5.6๏27.9๏ฐ ๏บ๏ป The neutral fault current is I b + I c = 3I 0 = j 5.25 Sequence voltages are obtained as V0 = V1 = V2 = − ( j1.75 )( j 0.199 ) = 0.348 Phase voltages are then ๏ฉVa ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ชVb ๏บ = ๏ช1 a ๏ชVc ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ0.348 ๏น ๏ฉ1.044 ๏น a ๏บ๏บ ๏ช๏ช 0.348 ๏บ๏บ = ๏ช๏ช 0 ๏บ๏บ a 2 ๏บ๏ป ๏ช๏ซ 0.348 ๏บ๏ป ๏ช๏ซ 0 ๏บ๏ป (d) In order to compute currents and voltages at the terminals of generators G1 and G2, we need to return to the original sequence circuits in the solution of Prob. 10.12. Generator G1 (Bus 4): For a single line-to-ground fault, sequence network interconnection is shown below: 261 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. From the solution of Prob. 10.31(a), I f = − j1.82 From the circuit above, I1 = I 2 = 1 I f = − j 0.91 2 Transforming the ๏ of (j0.3) in the zero-sequence network into an equivalent Y of (j0.1), and using the current divider, I0 = 0.15 ( − j1.82 ) = − j 0.62 0.29 + 0.15 Phase currents are then ๏ฉ I a ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ช I b ๏บ = ๏ช1 a ๏ช I c ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ − j 0.62 ๏น ๏ฉ 2.44๏ − 90๏ฐ๏น a ๏บ๏บ ๏ช๏ช − j 0.91๏บ๏บ = ๏ช๏ช 0.29๏90๏ฐ ๏บ๏บ a 2 ๏บ๏ป ๏ช๏ซ − j 0.91๏บ๏ป ๏ช๏ซ 0.29๏90๏ฐ ๏บ๏ป Sequence voltages are calculated as V0 = − ( − j 0.62 )( j 0.14 ) = −0.087; V1 = 1 − j 0.2 ( − j 0.91) = 0.818; V2 = − j 0.2 ( − j 0.91) = −0.182 262 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Phase voltages are then ๏ฉVa ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ชVb ๏บ = ๏ช1 a ๏ชVc ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ −0.087 ๏น ๏ฉ 0.549๏0๏ฐ ๏น a ๏บ๏บ ๏ช๏ช 0.818 ๏บ๏บ = ๏ช๏ช0.956๏245๏ฐ๏บ๏บ a 2 ๏บ๏ป ๏ช๏ซ −0.182 ๏บ๏ป ๏ช๏ซ 0.956๏115๏ฐ ๏บ๏ป Generator G2 (Bus 5): From the interconnected sequence networks and solution of Prob. 10.31, I f = − j1.182; I1 = I 2 = 1 I f = − j 0.91; I 0 = 0 2 Recall that Y – ๏ transformer connections produce 30๏ฐ phase shifts in sequence quantities. The HV quantities are to be shifted 30๏ฐ ahead of the corresponding LV quantities for positive sequence, and vice versa for negative sequence. One may however neglect phase shifts. Since bus 5 is the LV side, considering phase shifts, I1 = 0.91๏ − 90๏ฐ − 30๏ฐ = 0.91๏ − 120๏ฐ; I 2 = 0.91๏ − 90๏ฐ + 30๏ฐ = 0.91๏ − 60๏ฐ Phase currents are then given by ๏ฉ I a ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ช I b ๏บ = ๏ช1 a ๏ช I c ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น๏ฉ 0 ๏น ๏ฉ1.58๏ − 90๏ฐ ๏น ๏บ ๏ช a ๏บ ๏ช0.91๏ − 120๏ฐ๏บ๏บ = ๏ช๏ช1.58๏ + 90๏ฐ๏บ๏บ ๏บ๏ป a 2 ๏บ๏ป ๏ช๏ซ 0.91๏ − 60๏ฐ ๏บ๏ป ๏ช๏ซ 0 Positive and negative sequence voltages are the same as on the G1 side: V1 = 0.818; V2 = −0.182; V0 = 0; With phase shift V1 = 0.818๏ − 30๏ฐ V2 = 0.182๏210๏ฐ Phase voltages are calculated as ๏ฉVa ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ชVb ๏บ = ๏ช1 a ๏ชVc ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น๏ฉ 0 ๏น ๏ฉ0.744๏ − 42.2๏ฐ๏น ๏บ ๏ช a ๏บ ๏ช0.818๏ − 30๏ฐ๏บ๏บ = ๏ช๏ช 0.744๏222.2๏ฐ ๏บ๏บ a 2 ๏บ๏ป ๏ช๏ซ 0.182๏210๏ฐ ๏บ๏ป ๏ช๏ซ 1.00๏90๏ฐ ๏บ๏ป 263 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 10.32 (a) Refer to the solution of Problem 10.13. The negative sequence network is the same as the positive sequence network without the source. The zero-sequence network is shown below considering the transformer winding connections: For the single line-to-ground fault At bus 3 through a fault impedance Z F = j 0.1 , I 0 = I1 = I 2 = 1๏0๏ฐ j ( 0.22 + 0.22 + 0.35 + 0.3 ) = − j 0.9174 Fault currents are ๏ฉ I a ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ช I b ๏บ = ๏ช1 a ๏ช I c ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ I 0 ๏น ๏ฉ − j 2.7523๏น ๏ช ๏บ ๏บ a ๏บ๏บ ๏ช I1 ๏บ = ๏ช๏ช 0 ๏บ ๏บ๏ป a 2 ๏บ๏ป ๏ช๏ซ I 2 ๏บ๏ป ๏ช๏ซ 0 264 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (b) For a line-to-fault at bus 3 through a fault impedance of j0.1, I0 = 0 I1 = − I 2 = 1 = − j1.8519 j ( 0.22 + 0.22 + 0.1) Fault currents are then ๏ฉ I a ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ช I b ๏บ = ๏ช1 a ๏ช I c ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น๏ฉ 0 ๏น ๏ฉ 0 ๏น ๏บ ๏ช a ๏บ ๏ช − j1.8519๏บ๏บ = ๏ช๏ช −3.2075๏บ๏บ a 2 ๏บ๏ป ๏ช๏ซ j1.8519 ๏บ๏ป ๏ช๏ซ 3.2075 ๏บ๏ป (c) For a double line-to-ground fault at bus 3 through a common fault impedance to ground Z F = j 0.1 , I1 = 1๏0๏ฐ j 0.22 ( j 0.35 + j 0.3 ) j 0.22 + j 0.22 + j 0.35 + j 0.3 = − j 2.6017 I2 = 1 − ( j 0.22 )( − j 2.6017 ) I0 = − j 0.22 = j1.9438 1 − ( j 0.22 )( − j 2.6017 ) j 0.35 + j 0.3 = j 0.6579 Fault phase currents are then ๏ฉ I a ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ช I b ๏บ = ๏ช1 a ๏ช I c ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ j 0.6579 ๏น ๏ฉ 0 ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช − j 2.6017 ๏บ = ๏ช 4.058๏165.93°๏บ๏บ a 2 ๏บ๏ป ๏ช๏ซ j1.9438 ๏บ๏ป ๏ช๏ซ 4.058๏14.07° ๏บ๏ป Neutral fault current at bus 3 = I b + I c = 3I 0 = 1.9732๏90° 265 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 10.33 Positive sequence network of the system is shown below: Negative sequence network is same as above without sources. The zero sequence network is shown below: Using any one of the methods๏ฏalgorithms, sequence Z BUS can be obtained. (1) (1) ๏ฉ j 0.1437 (2) ๏ช๏ช j 0.1211 Z BUS1 = Z BUS 2 = (3) ๏ช j 0.0789 ๏ช (4) ๏ช๏ซ j 0.0563 (1) (1) ๏ฉ j 0.16 (2) ๏ช๏ช 0 Z BUS 0 = (3) ๏ช 0 ๏ช (4) ๏ช๏ซ 0 (2) (3) (4) j 0.1211 j 0.0789 j 0.1696 j 0.1104 j 0.1104 j 0.1696 j 0.0789 j 0.1211 j 0.0563 ๏น j 0789 ๏บ๏บ j 0.1211๏บ ๏บ j 0.1437 ๏บ๏ป (2) (3) (4) 0 0 j 0.08 j 0.08 j 0.08 j 0.58 0 0 0 ๏น 0 ๏บ๏บ 0 ๏บ ๏บ j 0.16 ๏บ๏ป Choosing the voltage at bus 3 as 1๏0° , the prefault current in line (2) – (3) is I 23 = P − jQ 0.5 ( 0.8 − j 0.6 ) = = 0.4 − j 0.3pu V3๏ช 1๏0° Line (2) – (3) has parameters given by Z1 = Z 2 = j 0.15; Z 0 = j 0.5 266 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Denoting the open-circuit points of the line as p and p๏ข , to simulate opening, we need to develop the Thévenin-equivalent sequence networks looking into the system between points p and p๏ข . Before any conductor opens, the current I mn in phase a of the line (m) – (n) is positive sequence, given by I mn = Vm − Vn Z1 Z pp๏ข1 = − Z12 ZTh ,mn,1 − Z1 ; Z pp๏ข 2 = − Z 02 − Z 22 ; Z pp๏ข 0 = ZTh ,mn,2 − Z 2 Z Th ,mn,0 − Z 0 To simulate opening phase a between points p and p๏ข , the sequence network connection is shown below: To simulate opening phases b and c between points p and p๏ข , the sequence network connection is shown below: 267 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. In this Problem − j ( 0.15 ) − Z12 Z pp๏ข1 = Z pp๏ข 2 = = Z 22 1 + Z 33 1 − 2 Z 23 1 − Z1 j 0.1696 + j 0.1696 − 2 ( j 0.1104 ) − j 0.15 2 = j 0.7120 − ( j 0.5 ) − Z 02 Z pp๏ข 0 = = Z 22 0 + Z 330 − 2 Z 230 − Z 0 j 0.08 + j 0.58 − 2 ( j 0.08 ) − j 0.5 2 =๏ฅ Note that an infinite impedance is seen looking into the zero sequence network between points p and p๏ข of the opening, if the line from bus (2) to bus (3) is opened. Also bus (3) would be isolated from the reference by opening the connection between bus (2) and bus (3). (a) One open conductor: Va 0 = Va1 = Va 2 = I 23 Z pp๏ข1 Z pp๏ข 2 Z pp๏ข1 + Z pp๏ข 2 = ( 0.4 − j 0.3 ) ( j 0.712 )( j 0.712 ) j ( 0.712 + 0.712 ) = 0.1068 + j 0.1424 ๏V3 1 = ๏V3 2 = Z 32 1 − Z33 1 Z1 Va1 = j 0.1104 − j 0.1696 ( 0.1068 + j 0.1424 ) j 0.15 = −0.0422 − j 0.0562 ๏V30 = Z 32 0 − Z 330 Z0 Va 0 = j 0.08 − j 0.58 ( 0.1068 + j 0.1424 ) j 0.5 = −0.1068 − j 0.1424 ๏V3 = ๏V30 + ๏V31 + ๏V32 = −0.1068 − j 0.1424 − 2 ( 0.0422 + j 0.0562 ) = −0.1912 − j 0.2548 Since the prefault voltage at bus (3) is 1๏0° , the new voltage at bus (3) is V3 + ๏V3 = (1 + j 0 ) + ( −0.1912 − j 0.2548 ) = 0.8088 − j 0.2548 = 0.848๏ − 17.5° pu (b) Two open conductors: Inserting an infinite impedance of the zero sequence network in series between points p and p๏ข of the positive-sequence network causes an open circuit in the latter. No power transfer can occur in the system. Obviously, power cannot be transferred by only one phase conductor of the transmission line, since the zero sequence network offers no return path for current. 268 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 10.34 Va = 0; Vb = Vc ; I b + I c = 0 Sequence currents are given by 1 1 1 I 0 = I a ; I1 = ๏ฉ๏ซ I a + ( a − a 2 ) I b ๏น๏ป ; I 2 = ๏ฉ๏ซ I a + ( a 2 − a ) I b ๏น๏ป 3 3 3 One can conclude that I1 + I 2 = 2 I 0 Sequence network connection to satisfy the above: Sequence voltages are obtained below: 1 1 V1 = ๏ฉ๏ซ( a + a 2 ) Vb ๏น๏ป = − Vb 3 3 1 1 V2 = ๏ฉ๏ซ( a + a 2 ) Vb ๏น๏ป = − Vb 3 3 1 2 V0 = ( 2Vb ) = Vb 3 3 Thus V1 = V2 and V1 + V2 + V0 = 0 The sequence network interconnection is then given by: 269 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 10.35 (a) Following Ex. 10.2 of the text: I1 = 1๏0° = − j 6.67; I 2 = 0; I 0 = 0 j 0.15 V0 = V1 = V2 = 0 I a = 6.67๏ − 90°; I b = 6.67๏150°; I c = 6.67๏30° ๏ฌ Va = Vb = Vc = 0 ( Bolted 3-phase fault ) ๏ฌ (b) Following Ex. 10.3 of the text I 0 = I1 = I 2 = 1๏0๏ฐ j ( 0.15 + 0.15 + 0.2 ) = − j2 I a = 3 ( − j 2 ) = − j 6; I b = I c = 0 ๏ฌ ๏ฉV0 ๏น ๏ฉ 0 ๏น ๏ฉ j 0.2 ๏ช ๏บ ๏ช ๏บ ๏ช ๏ชV1 ๏บ = ๏ช1๏0°๏บ − ๏ช 0 ๏ชV2 ๏บ ๏ช๏ซ 0 ๏บ๏ป ๏ช๏ซ 0 ๏ซ ๏ป 0 j 0.15 0 0 ๏น ๏ฉ− j2๏น 0 ๏บ๏บ ๏ช๏ช − j 2 ๏บ๏บ j 0.15๏บ๏ป ๏ช๏ซ − j 2 ๏บ๏ป ๏ฉ −0.4 ๏น = ๏ช๏ช 0.7 ๏บ๏บ ๏ช๏ซ −0.3 ๏บ๏ป ๏ฉVa ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ชVb ๏บ = ๏ช1 a ๏ชVc ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ −0.4 ๏น ๏ฉ 0 ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช 0.7 ๏บ = ๏ช1.11๏233°๏บ๏บ ๏ฌ a 2 ๏บ๏ป ๏ช๏ซ −0.3 ๏บ๏ป ๏ช๏ซ1.11๏125° ๏บ๏ป (c) Following Ex. 10.4 of the text: I1 = − I 2 = 1๏0๏ฐ j ( 0.15 + 0.15 ) = − j 3.333 I0 = 0 270 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ( ) I b = − j 3 ( − j 3.333 ) = −5.773๏ผ๏ฏ ๏ฝ ๏ฌ I c = 5.773; I a = 0 ๏ฏ๏พ V1 = V2 = I1 ( j 0.15 ) = 0.5; V0 = 0 ๏ฉVa ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ชVb ๏บ = ๏ช1 a ๏ชVc ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ 0 ๏น ๏ฉ 1.0 ๏น a ๏บ๏บ ๏ช๏ช0.5๏บ๏บ = ๏ช๏ช −0.5๏บ๏บ ๏ฌ a 2 ๏บ๏ป ๏ช๏ซ0.5๏บ๏ป ๏ช๏ซ −0.5๏บ๏ป (d) Following Ex. 10.5 of the text: 1๏0๏ฐ 0.15 ๏ด 0.2 ๏น ๏ฉ j ๏ช0.15 + 0.15 + 0.2 ๏บ๏ป ๏ซ = − j 4.242 I1 = 0.2 ๏ฆ ๏ถ I 2 = ( j 4.242 ) ๏ง ๏ท ๏จ 0.2 + 0.15 ๏ธ = j 2.424 ๏ฆ 0.15 ๏ถ I 0 = ( j 4.242 ) ๏ง ๏ท = j1.818 ๏จ 0.2 + 0.15 ๏ธ ๏ฉ I a ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ช I b ๏บ = ๏ช1 a ๏ช I c ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ j1.818 ๏น ๏ฉ 0 ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช − j 4.242 ๏บ = ๏ช5.5๏118.2°๏บ๏บ ๏ฌ a 2 ๏บ๏ป ๏ช๏ซ j 2.424 ๏บ๏ป ๏ช๏ซ 5.5๏61.8° ๏บ๏ป V0 = V1 = V2 = − j1.818 ( j 0.2 ) = 0.364 ๏ฉVa ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ชVb ๏บ = ๏ช1 a ๏ชVc ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ0.364 ๏น ๏ฉ1.092 ๏น a ๏บ๏บ ๏ช๏ช0.364 ๏บ๏บ = ๏ช๏ช 0 ๏บ๏บ ๏ฌ a 2 ๏บ๏ป ๏ช๏ซ0.364 ๏บ๏ป ๏ช๏ซ 0 ๏บ๏ป Worst fault: 3-phase fault with a fault current of 6.67 pu ๏ฌ 10.36 The positive-sequence per-phase circuit is shown below: ๏ช V3 I LOAD = 1; I LOAD = 1.02๏ − 10° prior to the fault E = 1๏0๏ฐ + j 0.1(1.02๏ − 10๏ฐ ) = 1.023๏5.64๏ฐ 271 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. With a short from bus 2 to ground, i.e. with switch closed, I FAULT = 1.023๏5.64๏ฐ = 5.115๏ − 84.36๏ฐ ๏ฌ j 0.2 10.37 (a) E1 = 1๏0๏ฐ + (1๏0๏ฐ )( j 0.1) = 1 + j 0.1 E2 = 1๏0๏ฐ − (1๏0๏ฐ )( j 0.15 ) = 1 − j 0.15 With switch closed, I1 = E1 1 + j 0.1 = = 1 − j10 j 0.1 j 0.1 I2 = E2 1 − j 0.15 = = −1 − j 6.67 j 0.15 j 0.15 I = I1 + I 2 = − j16.67 ๏ฌ (b) Superposition: Ignoring prefault currents E1 = E2 = 1๏0๏ฐ I1 = 1๏0๏ฐ 1๏0๏ฐ = − j10; I 2 = = − j 6.67 j 0.1 j 0.15 I = I1 + I 2 = − j16.67 Now load currents are superimposed: I1 = I1 FAULT + I1 LOAD = − j10 + 1 = 1 − j10 I 2 = I 2 FAULT + I 2 LOAD = − j 6.67 + (−1) = −1 − j 6.67 I = I FAULT + I LOAD = − j16.67 ๏ฌ Same as in part (a) ๏ฌ 10.38 I1−1 = VF 1.0๏0๏ฐ = = − j8.333per unit Z11−1 j 0.12 ๏ฉ I1๏ข๏ขa ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I1b ๏บ = ๏ช1 a ๏ช I1๏ข๏ขc ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ0 ๏น ๏ฉ8.333๏ − 90๏ฐ๏น ๏บ ๏ช a ๏บ ๏ช8.333๏ − 90๏ฐ๏บ๏บ = ๏ช๏ช8.333๏150๏ฐ ๏บ๏บ per unit ๏บ๏ป ๏ช๏ซ8.333๏30๏ฐ ๏บ๏ป a 2 ๏บ๏ป ๏ช๏ซ0 Using Eq. (10.5.9) with k = 2 and n = 1: ๏ฉV2 − 0 ๏น ๏ฉ 0 ๏น ๏ฉ0 ๏ช ๏บ ๏ช ๏บ ๏ช ๏ชV2 −1 ๏บ = ๏ช1๏0๏ฐ๏บ − ๏ช0 ๏ชV2 − 2 ๏บ ๏ช๏ซ 0 ๏บ๏ป ๏ช๏ซ0 ๏ซ ๏ป 0 j 0.08 0 0 ๏น๏ฉ 0 ๏น ๏ฉ 0 ๏น 0 ๏บ๏บ ๏ช๏ช − j8.333๏บ๏บ = ๏ช๏ช 0.3333๏บ๏บ per unit j 0.08๏บ๏ป ๏ช๏ซ 0 ๏บ๏ป ๏ช๏ซ 0 ๏บ๏ป 272 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฉV2 ag ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ชV2 bg ๏บ = ๏ช1 a ๏ช ๏บ ๏ช1 a ๏ซ๏ชV2 cg ๏ป๏บ ๏ซ 1 ๏น ๏ฉ 0 ๏น ๏ฉ0.3333๏0๏ฐ ๏น a ๏บ๏บ ๏ช๏ช0.3333๏บ๏บ = ๏ช๏ช 0.3333๏240๏ฐ๏บ๏บ per unit a 2 ๏บ๏ป ๏ช๏ซ 0 ๏บ๏ป ๏ช๏ซ0.3333๏120๏ฐ ๏บ๏ป 10.39 I1−0 = I1−1 = I1−2 = VF 1.0๏0๏ฐ = Z11−0 + Z11−1 + Z11−2 j ( 0.10 + 0.12 + 0.12 ) = − j 2.941per unit ๏ฉ I1๏ข๏ขa ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I1b ๏บ = ๏ช1 a ๏ช I1๏ข๏ขc ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ − j 2.941๏น ๏ฉ − j8.824 ๏น a ๏บ๏บ ๏ช๏ช − j 2.941๏บ๏บ = ๏ช๏ช 0 ๏บ๏บ per unit a 2 ๏บ๏ป ๏ช๏ซ − j 2.941๏บ๏ป ๏ช๏ซ 0 ๏บ๏ป Using Eq. (10.5.9) with k = 2 and n = 1: ๏ฉV2 − 0 ๏น ๏ฉ 0 ๏น ๏ฉ0 ๏ช ๏บ ๏ช ๏บ ๏ช ๏ชV2 −1 ๏บ = ๏ช1๏0๏ฐ๏บ − ๏ช0 ๏ชV2 − 2 ๏บ ๏ช๏ซ 0 ๏บ๏ป ๏ช๏ซ0 ๏ซ ๏ป ๏ฉV2 ag ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ชV2 bg ๏บ = ๏ช1 a ๏ช ๏บ ๏ช๏ซV2 cg ๏บ๏ป ๏ช๏ซ1 a 10.40 I1−1 = − I1−2 = 0 j.08 0 0 ๏น ๏ฉ − j 2.941๏น ๏ฉ 0 ๏น 0 ๏บ๏บ ๏ช๏ช − j 2.941๏บ๏บ = ๏ช๏ช 0.7647 ๏บ๏บ per unit j.08 ๏บ๏ป ๏ช๏ซ − j 2.941๏บ๏ป ๏ช๏ซ −0.2353๏บ๏ป 1 ๏น ๏ฉ 0 ๏น ๏ฉ0.5294๏0๏ฐ ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช .7647 ๏บ = ๏ช0.9056๏253.0๏ฐ๏บ๏บ per unit a 2 ๏บ๏ป ๏ช๏ซ −.2353๏บ๏ป ๏ช๏ซ0.9056๏107.0๏ฐ ๏บ๏ป VF 1.0๏0๏ฐ = Z11−1 + Z11−2 j (.12 + .12 ) = − j 4.167 per unit ๏ฉ I1๏ข๏ขa ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I1b ๏บ = ๏ช1 a ๏ช I1๏ข๏ขc ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น๏ฉ 0 ๏น ๏ฉ 0 ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช − j 4.167 ๏บ = ๏ช7.217๏180๏ฐ๏บ๏บ per unit a 2 ๏บ๏ป ๏ช๏ซ + j 4.167 ๏บ๏ป ๏ช๏ซ 7.217๏0๏ฐ ๏บ๏ป Using Eq. (10.5.9) with k = 2 and n = 1: ๏ฉV2 − 0 ๏น ๏ฉ 0 ๏น ๏ฉ0 ๏ช ๏บ ๏ช ๏บ ๏ช ๏ชV2 −1 ๏บ = ๏ช1๏0๏ฐ๏บ − ๏ช0 ๏ชV2 − 2 ๏บ ๏ช๏ซ 0 ๏บ๏ป ๏ช๏ซ0 ๏ซ ๏ป ๏ฉV2 ag ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ชV2 bg ๏บ = ๏ช1 a ๏ช ๏บ ๏ช1 a ๏ซ๏ชV2 cg ๏ป๏บ ๏ซ 0 j 0.08 0 0 ๏น๏ฉ 0 ๏น ๏ฉ 0 ๏น 0 ๏บ๏บ ๏ช๏ช − j 4.167 ๏บ๏บ = ๏ช๏ช0.6667 ๏บ๏บ per unit j 0.08 ๏บ๏ป ๏ช๏ซ j 4.167 ๏บ๏ป ๏ช๏ซ 0.3333 ๏บ๏ป 1 ๏น๏ฉ 0 ๏น ๏ฉ 1.0 ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช.6667 ๏บ = ๏ช0.5774๏210๏ฐ๏บ๏บ per unit a 2 ๏บ๏ป ๏ช๏ซ.3333๏บ๏ป ๏ช๏ซ 0.5774๏150๏ฐ ๏บ๏ป 273 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 10.41 I1−1 = VF 1.0๏0๏ฐ = Z11−1 + Z11−2 // Z11−0 j ( 0.12 + 0.12 // 0.10 ) = − j 5.729 per unit ๏ฆ 0.10 ๏ถ I1− 2 = ( + j 5.729 ) ๏ง ๏ท = j 2.604 per unit ๏จ 0.22 ๏ธ ๏ฆ 0.12 ๏ถ I1−0 = ( + j 5.729 ) ๏ง ๏ท = j 3.125per unit ๏จ 0.22 ๏ธ ๏ฉ I1๏ข๏ขa ๏น ๏ฉ1 1 ๏ช ๏ข๏ข ๏บ ๏ช 2 ๏ช I1b ๏บ = ๏ช1 a ๏ช I1๏ข๏ขc ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ j 3.125 ๏น ๏ฉ 0 ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช − j 5.729 ๏บ = ๏ช8.605๏147.0๏ฐ๏บ๏บ per unit a 2 ๏บ๏ป ๏ช๏ซ + j 2.604 ๏บ๏ป ๏ช๏ซ 8.605๏33.0๏ฐ ๏บ๏ป Using Eq. (10.5.9) with k = 2 and n = 1: ๏ฉV2 −0 ๏น ๏ฉ 0 ๏น ๏ฉ0 ๏ช ๏บ ๏ช ๏บ ๏ช ๏ชV2 −1 ๏บ = ๏ช1.0๏0๏ฐ๏บ − ๏ช0 ๏ชV2 −2 ๏บ ๏ช๏ซ 0 ๏บ๏ป ๏ช๏ซ0 ๏ซ ๏ป ๏ฉV2 ag ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ชV2 bg ๏บ = ๏ช1 a ๏ช ๏บ ๏ช๏ซV2 cg ๏บ๏ป ๏ช๏ซ1 a 0 j.08 0 0 ๏น ๏ฉ j 3.125 ๏น ๏ฉ 0 ๏น 0 ๏บ๏บ ๏ช๏ช − j 5.729 ๏บ๏บ = ๏ช๏ช0.5417 ๏บ๏บ per unit j.08 ๏บ๏ป ๏ช๏ซ j 2.604 ๏บ๏ป ๏ช๏ซ 0.2083๏บ๏ป 1๏น ๏ฉ 0 ๏น ๏ฉ 0.750 ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ − ๏ช.5417 ๏บ = ๏ช 0.4733๏217.6๏ฐ๏บ๏บ per unit a 2 ๏บ๏ป ๏ช๏ซ.2083๏บ๏ป ๏ช๏ซ 0.4733๏142.4๏ฐ ๏บ๏ป [Note: For details on “formation of Z bus one step at a time”, please refer to edition 1 or 2 of the text.] 10.42 (a) Zero sequence bus impedance matrix: Step (1): Add Z b = j 0.10 from the reference to bus 1 (type 1) Z bus -0 = j 0.10 per unit Step (2): Add Z b = j 0.2563 from bus 1 to bus 2 (type 2) ๏ฉ0.10 0.10 ๏น Z bus −0 = j ๏ช ๏บ per unit ๏ซ๏ช0.10 0.3563๏บ๏ป Step (3): Add Z b = j 0.10 from the reference to bus 2 (type 3) 0.1 ๏น ๏ฉ0.1 ๏ฉ.07808 .02192 ๏น j ๏ฉ .10 ๏น Z bus − 0 = j ๏ช − .10.3563๏ = j ๏ช ๏ ๏บ ๏บ ๏ช ๏บ ๏ซ๏ช0.1 0.3563๏บ๏ป .4563 ๏ซ.3563๏ป ๏ซ๏ช.02192 .07808 ๏ป๏บ Step (4): Add Z b = j 0.1709 from bus 2 to bus 3 (type 2) ๏ฉ 0.07808 0.02192 0.02192๏น Z bus −0 = j ๏ช๏ช0.02192 0.07808 0.07808๏บ๏บ per unit ๏ช๏ซ0.02192 0.07808 0.24898๏บ๏ป 274 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Step (5): Add Z b = j 0.1709 from bus 1 to bus 3 (type 4) ๏ฉ.07808+ ๏ช Z bus − 0 = j ๏ช .02192 ๏ช๏ซ .02192 .02192 .02192− ๏น ๏บ .07808 .07808 ๏บ .07808 .24898 ๏บ๏ป ๏ฉ .05616 ๏น j ๏ช − −.05616 ๏บ๏บ ๏.05616 − .05616 − .22706๏ .45412 ๏ช ๏ช๏ซ −.22706 ๏บ๏ป 0.05 ๏น ๏ฉ0.07114 0.02887 ๏ช Z bus −0 = j ๏ช 0.02887 0.07114 0.05 ๏บ๏บ per unit ๏ช๏ซ 0.05 0.05 0.13545๏บ๏ป Positive sequence bus impedance matrix: Step (1): Add Z b = j 0.28 from the reference to bus 1 (type 1) Zbus−1 = j ๏0.28๏ per unit Step (2): Add Z b = j 0.08544 from bus 1 to bus 2 (type 2) .28 ๏น ๏ฉ.28 Z bus −1 = j ๏ช ๏บ per unit ๏ช๏ซ.28 .36544 ๏บ๏ป Step (3): Add Z b = j 0.3 from the reference to bus 2 (type 3) ๏ฉ.16218 .12623๏น .28 ๏น ๏ฉ.28 j ๏ฉ .28 ๏น Z bus −1 = j ๏ช − .28 .36544 ๏ = j ๏ช ๏ ๏บ ๏บ ๏ช ๏บ ๏ช๏ซ.12623 .16475๏บ๏ป ๏ซ.28 .36544 ๏ป .66544 ๏ซ.36544 ๏ป Step (4): Add Z b = j.06835 from bus 2 to bus 3 (type 2) ๏ฉ0.16218 0.12623 0.12623๏น Z bus −1 = j ๏ช๏ช 0.12623 0.16475 0.16475๏บ๏บ per unit ๏ช๏ซ 0.12623 0.16475 0.2331 ๏บ๏ป Step (5): Add Z b = j.06835 from bus 1 to bus 3 (type 4) ๏ฉ.16218 .12623 .12623๏น ๏ฉ +.03595๏น j ๏ช ๏ช ๏บ Z bus −1 = j ๏ช.12623 .16475 .16475๏บ − −.03852 ๏บ๏บ .21117 ๏ช ๏ช๏ซ.12623 .16475 .2331 ๏บ๏ป ๏ช๏ซ −.10687 ๏บ๏ป ๏.03595 − .03852 − .10687๏ ๏ฉ.15606 .13279 .14442 ๏น Z bus −1 = j ๏ช๏ช.13279 .15772 .14526 ๏บ๏บ per unit ๏ช๏ซ.14442 .14526 .17901๏บ๏ป 275 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Step (6): Add Z b = j (.4853 //.4939) = j 0.2448 from the reference to bus 3 (type 3) ๏ฉ.15606 .13279 .14442 ๏น ๏ฉ.14442 ๏น j ๏ช ๏ช ๏บ Z bus −1 = j ๏ช.13279 .15772 .14526 ๏บ − .14526 ๏บ๏บ .42379 ๏ช ๏ช๏ซ.14442 .14526 .17901๏บ๏ป ๏ช๏ซ.17901๏บ๏ป ๏.14442 .14526 .17901๏ ๏ฉ 0.1068 0.08329 0.08342 ๏น Z bus −1 = j ๏ช๏ช 0.08329 0.1079 0.08390 ๏บ๏บ per unit ๏ช๏ซ0.08342 0.08390 0.10340 ๏บ๏ป Negative sequence bus impedance matrix: Steps (1) – (5) are the same as for Z bus −1 . Step (6): Add Z b = j (.5981//.4939) = j 0.2705 from the reference bus to bus 3 (type 3) ๏ฉ.15606 .13279 .14442๏น ๏ฉ.14442๏น j ๏ช ๏ช ๏บ Z bus − 2 = j ๏ช.13279 .15772 .14526๏บ − .14526๏บ๏บ ๏.14442 14526 17901๏ ๏ช .44951 ๏ช๏ซ.14442 .14526 .17901๏บ๏ป ๏ช๏ซ .17901๏บ๏ป ๏ฉ 0.1097 0.08612 0.08691๏น Z bus −2 = j ๏ช๏ช0.08612 0.11078 0.08741๏บ๏บ per unit ๏ช๏ซ 0.08691 0.08741 0.10772๏บ๏ป (b) From the results of Problem 10.42(a), Z11−0 = j 0.07114, Z11−1 = j 0.1068 , and Z11−2 = j 0.1097 per unit are the same as the Thévenin equivalent sequence impedances at bus 1, as calculated in Problem 10.2. Therefore, the fault currents calculated from the sequence impedance matrices will be the same as those calculated in Problems 10.3 and 10.14–10.17. 10.43 I1−1 = VF 1.03๏0๏ฐ = = 5.15๏ − 90๏ฐ per unit Z11−1 j 0.20 ๏ฉ I1๏ข๏ขa ๏น ๏ฉ1 1 1 ๏น ๏ฉ0 ๏น ๏ฉ5.15 ๏ − 90๏ฐ๏น ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ 2 ๏ช I1๏ข๏ขb ๏บ = ๏ช1 a a ๏บ ๏ช5.15 ๏ − 90๏ฐ๏บ = ๏ช5.15 ๏150๏ฐ ๏บ per unit ๏ช I1๏ข๏ขc ๏บ ๏ช๏ซ1 a a 2 ๏บ๏ป ๏ช๏ซ0 ๏บ๏ป ๏ช๏ซ5.15 ๏30๏ฐ ๏บ๏ป ๏ซ ๏ป Using (10.5.9) with k = 2 and n = 1: ๏ฉV2− 0 ๏น ๏ฉ0 0 ๏น ๏ฉ0 0 ๏น ๏ฉ0 ๏น ๏ฉ0 ๏น ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏ชV2−1 ๏บ = ๏ช1.03 ๏0๏ฐ๏บ − ๏ช0 j 0.10 0 ๏บ ๏ช − j 5.15๏บ = ๏ช0.515๏บ per unit ๏ชV2− 2 ๏บ ๏ช๏ซ0 ๏บ๏ป ๏ช๏ซ0 0 ๏บ๏ป ๏ช๏ซ0 ๏บ๏ป j 0.10 ๏บ๏ป ๏ช๏ซ0 ๏ซ ๏ป 276 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฉV2 ag ๏น ๏ฉ1 1 1 ๏น ๏ฉ0 ๏น ๏ฉ0.515 ๏0๏ฐ ๏น ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ 2 ๏ชV1bg ๏บ = ๏ช1 a a ๏บ ๏ช 0.515๏บ = ๏ช 0.515 ๏240๏ฐ๏บ per unit ๏ช ๏บ ๏ช1 a a 2 ๏บ ๏ช 0 ๏บ๏ป ๏ช๏ซ 0.515 ๏120๏ฐ ๏บ๏ป ๏ป๏ซ ๏ซ๏ชV2 cg ๏ป๏บ ๏ซ 10.44 I1−0 = I1−1 = I1− 2 = VF 1.03 ๏ 0๏ฐ = = − j 2.06 per unit Z11−0 + Z11−1 + Z11− 2 j ( 0.10 + 0.2 + 0.2 ) ๏ฉ I1๏ข๏ขa ๏น ๏ฉ1 1 1 ๏น ๏ฉ − j 2.06 ๏น ๏ฉ6.18 ๏ − 90๏ฐ๏น ๏ช ๏บ ๏ช ๏บ๏ช ๏บ ๏ช ๏บ per unit 2 0 ๏ช I1๏ข๏ขb ๏บ = ๏ช1 a a ๏บ ๏ช − j 2.06 ๏บ = ๏ช ๏บ ๏ช I1๏ข๏ขc ๏บ ๏ช๏ซ1 a a 2 ๏บ๏ป ๏ช๏ซ − j 2.06 ๏บ๏ป ๏ช๏ซ ๏บ๏ป 0 ๏ซ ๏ป ๏ฉV2 −0 ๏น ๏ฉ0 0 ๏น ๏ฉ0 0 ๏น ๏ฉ − j 2.06 ๏น ๏ฉ0 ๏น ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏ชV2 −1 ๏บ = ๏ช1.03 ๏0๏ฐ๏บ − ๏ช0 j 0.10 0 ๏บ ๏ช − j 2.06 ๏บ = ๏ช0.824 ๏บ per unit ๏ชV2 − 2 ๏บ ๏ช๏ซ0 ๏บ๏ป ๏ช๏ซ0 0 j 0.10 ๏บ๏ป ๏ช๏ซ − j 2.06 ๏บ๏ป ๏ช๏ซ −0.206 ๏บ๏ป ๏ซ ๏ป ๏ฉV2 ag ๏น ๏ฉ1 1 1 ๏น ๏ฉ0 ๏น ๏ฉ0.618 + j 0 ๏น ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ 2 ๏ชV2 bg ๏บ = ๏ช1 a a ๏บ ๏ช0.824 ๏บ = ๏ช −0.309 − j 0.892 ๏บ per unit ๏ชV2 cg ๏บ ๏ช๏ซ1 a a 2 ๏บ๏ป ๏ช๏ซ −0.206 ๏บ๏ป ๏ช๏ซ −0.309 + j 0.892 ๏บ๏ป ๏ซ ๏ป 10.45 I1−1 = − I1− 2 = VF 1.03 ๏0๏ฐ = = 2.575 ๏ − 90๏ฐ per unit Z11−1 + Z11− 2 j ( 0.2 + 0.2 ) 0 ๏น ๏ฉ I1๏ข๏ขa ๏น ๏ฉ1 1 1 ๏น ๏ฉ0 ๏น ๏ฉ ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ 2 ๏ช I1๏ข๏ขb ๏บ = ๏ช1 a a ๏บ ๏ช − j 2.575 ๏บ = ๏ช −2.575 3 ๏บ per unit ๏ช I1๏ข๏ขc ๏บ ๏ช๏ซ1 a a 2 ๏บ๏ป ๏ช๏ซ + j 2.575๏บ๏ป ๏ช +2.575 3 ๏บ ๏ซ ๏ป ๏ซ ๏ป ๏ฉV2− 0 ๏น ๏ฉ0 0 ๏น ๏ฉ0 0 ๏น๏ฉ 0 ๏น ๏ฉ 0 ๏น ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช − j 2.575๏บ = ๏ช0.7725๏บ per unit ๏ชV2−1 ๏บ = ๏ช1.03 ๏0๏ฐ๏บ − ๏ช0 j 0.10 0 ๏บ๏ช ๏บ ๏ช ๏บ ๏ชV2− 2 ๏บ ๏ช๏ซ0 ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ๏ป 0 0 j 0.10 + j 2.575 0.2575 ๏ป ๏ซ ๏ป๏ซ ๏ป ๏ซ ๏ซ ๏ป ๏ฉV2 ag ๏น ๏ฉ1 1 1 ๏น ๏ฉ0 ๏น ๏ฉ 1.03 ๏น ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ 2 ๏ชV2bg ๏บ = ๏ช1 a a ๏บ ๏ช0.7725๏บ = ๏ช −0.515 − j 0.446 ๏บ per unit ๏ช ๏บ ๏ช1 a a 2 ๏บ ๏ช0.2575๏บ ๏ช −0.515 + j 0.446๏บ ๏ป๏ซ ๏ป ๏ซ ๏ป ๏ซ๏ชV2 cg ๏ป๏บ ๏ซ 10.46 I1−1 = VF 1.03 ๏0๏ฐ = = 3.86๏ − 90๏ฐ per unit Z11−1 + Z11− 2 // Z11−0 ๏ฉ 0.20 )( 0.10 ) ๏น ( j ๏ช0.20 + ๏บ 0.30 ๏ซ ๏ป ๏ฆ 0.10 ๏ถ I1− 2 = ( 3.86๏ + 90๏ฐ ) ๏ง ๏ท = 1.29 ๏90๏ฐ per unit ๏จ 0.30 ๏ธ ๏ฆ 0.20 ๏ถ I1− 0 = ( 3.86๏ + 90๏ฐ ) ๏ง ๏ท = 2.58 ๏90๏ฐ ๏จ 0.30 ๏ธ 277 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฉ I1๏ข๏ขa ๏น ๏ฉ1 1 1 ๏น ๏ฉ j 2.58 ๏น ๏ฉ 0 ๏น ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ 2 ๏ช I1๏ข๏ขb ๏บ = ๏ช1 a a ๏บ ๏ช − j 3.86 ๏บ = ๏ช −4.460 + j 3.86 ๏บ per unit ๏ช I1๏ข๏ขc ๏บ ๏ซ๏ช1 a a 2 ๏ป๏บ ๏ซ๏ช j1.29 ๏ป๏บ ๏ซ๏ช +4.460 + j 3.86 ๏ป๏บ ๏ซ ๏ป ๏ฉV2− 0 ๏น ๏ฉ0 0 ๏น ๏ฉ0 0 ๏น ๏ฉ j 2.58 ๏น ๏ฉ0 ๏น ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏ชV2−1 ๏บ = ๏ช1.03 ๏0๏ฐ๏บ − ๏ช0 j 0.10 0 ๏บ ๏ช − j 3.86 ๏บ = ๏ช0.644 ๏บ per unit ๏ชV2− 2 ๏บ ๏ช๏ซ0 ๏บ๏ป ๏ช๏ซ0 0 j 0.10 ๏บ๏ป ๏ช๏ซ j1.29 ๏บ๏ป ๏ช๏ซ0.129 ๏บ๏ป ๏ซ ๏ป ๏ฉV2 ag ๏น ๏ฉ1 1 1 ๏น ๏ฉ0 ๏น ๏ฉ 0.77 ๏น ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ ๏ช ๏บ 2 ๏ชV2bg ๏บ = ๏ช1 a a ๏บ ๏ช0.644 ๏บ = ๏ช −0.386 − j 0.446 ๏บ per unit ๏ช ๏บ ๏ช1 a a 2 ๏บ ๏ช0.129 ๏บ ๏ช −0.386 + j 0.446 ๏บ ๏ป๏ซ ๏ป ๏ซ ๏ป ๏ซ๏ชV2 cg ๏ป๏บ ๏ซ 10.47 Zero sequence bus impedance matrix: Step (1): Add Z b = j 0.10 from the reference to bus 1 (type 1) Z bus − 0 = j 0.10 per unit Step (2): Add Z 6 = j 0.60 from bus 1 to bus 2 (type 2) ๏ฉ0.10 0.10 ๏น Z bus − 0 = j ๏ช ๏บ per unit ๏ซ0.10 0.70 ๏ป Step (3): Add Z b = j 0.10 from the reference to bus 2 (type 3) ๏ฉ0.10 0.10 ๏น ๏ฉ0.0875 0.0125๏น j ๏ฉ0.10 ๏น ๏ 0.10 0.70๏ Z bus − 0 = j ๏ช − = j๏ช ๏บ ๏ช ๏บ ๏บ ๏ซ0.10 0.70 ๏ป 0.80 ๏ซ0.70 ๏ป ๏ซ0.0125 0.0875๏ป Step (4): Add Z b = j 0.40 from bus 2 to bus 3 (type 2) ๏ฉ0.0875 0.0125 0.0125๏น Z bus −0 = j ๏ช๏ช0.0125 0.0875 0.0875๏บ๏บ per unit ๏ช๏ซ0.0125 0.0875 0.4875๏บ๏ป Step (5): Add Z b = j 0.40 from bus 1 to bus 3 (type 4) ๏ฉ 0.0875 0.0125 0.0125๏น ๏ฉ 0.075 ๏น ๏ 0.075 −0.075 −0.475๏ j ๏ช ๏ช ๏บ Z bus − 0 = j ๏ช 0.0125 0.0875 0.0875๏บ − −0.075๏บ๏บ 0.95 ๏ช ๏ช๏ซ 0.0125 0.0875 0.4875๏บ๏ป ๏ช๏ซ −0.475๏บ๏ป ๏ฉ 0.08158 0.01842 0.050 ๏น = j ๏ช๏ช 0.01842 0.08158 0.050 ๏บ๏บ per unit ๏ช๏ซ 0.050 0.050 0.250 ๏บ๏ป Positive sequence Bus Impedance Matrix: Step (1): Add Z b = j 0.25 from the reference to bus 1 (type 1) Z bus −1 = j 0.25 per unit Step (2): Add Z b = j 0.20 from bus 1 to bus 2 (type 2) 278 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฉ0.25 0.25๏น Z bus −1 = j ๏ช ๏บ per unit ๏ซ0.25 0.45๏ป Step (3): Add Z b = j 0.35 from the reference to bus 2 (types) ๏ฉ0.25 0.25๏น ๏ฉ0.1719 0.1094๏น j ๏ฉ0.25๏น ๏0.25 0.45๏ Z bus −1 = j ๏ช − = j๏ช ๏บ ๏ช ๏บ ๏บ ๏ซ0.25 0.45๏ป 0.8 ๏ซ0.45๏ป ๏ซ0.1094 0.1969๏ป Step (4): Add Z b = j 0.16 from bus 2 to bus 3 (type 2) ๏ฉ0.1719 0.1094 0.1094๏น Zbus −1 = j ๏ช๏ช0.1094 0.1969 0.1969๏บ๏บ per unit ๏ช๏ซ0.1094 0.1969 0.3569๏บ๏ป Step (5): Add Z b = j 0.16 from bus 1 to bus 3 (type 4) ๏ฉ0.1719 0.1094 0.1094๏น ๏ฉ 0.0625 ๏น ๏0.0625 −0.0875 −0.2475๏ −j ๏ช ๏ช ๏บ Z bus −1 = j ๏ช0.1094 0.1969 0.1969๏บ −0.0875๏บ๏บ 0.47 ๏ช ๏ช๏ซ0.1094 0.1969 0.3569๏บ๏ป ๏ช๏ซ−0.2475๏บ๏ป ๏ฉ0.1636 0.1210 0.1423๏น = j ๏ช๏ช0.1210 0.1806 0.1508๏บ๏บ per u nit ๏ช๏ซ0.1423 0.1508 0.2266๏บ๏ป Step (6): Add Zb = j (0.5786 0.4853) = j0.2639 from the reference to bus 3 (type 3) ๏ฉ0.1636 0.1210 0.1423๏น ๏ฉ0.1423๏น ๏0.1423 0.1508 0.2266๏ j ๏ช ๏บ ๏ช0.1508๏บ Z bus −1 = j ๏ช0.1210 0.1806 0.1508๏บ − ๏บ 0.4905 ๏ช ๏ช๏ซ0.1423 0.1508 0.2266๏บ๏ป ๏ช๏ซ0.2266๏บ๏ป ๏ฉ0.1223 0.0773 0.0766๏น = j ๏ช๏ช0.0773 0.1342 0.0811๏บ๏บ per uni t ๏ช๏ซ0.0766 0.0811 0.1219๏บ๏ป Negative Sequence Bus Impedance Matrix: Steps (1)–(5) are the same as for Z bus −1 . Step (6): Add Z b = j (0.5786 .5981) = j 0.2941 from the reference to bus 3 (types 3). ๏ฉ0.1636 0.1210 0.1423๏น ๏ฉ0.1423๏น ๏0.1423 0.1508 0.2266๏ j ๏ช ๏บ ๏ช0.1508๏บ Z bus −1 = j ๏ช0.1210 0.1806 0.1508๏บ − ๏บ 0.5207 ๏ช ๏ช๏ซ0.1423 0.1508 0.2266๏บ๏ป ๏ช๏ซ0.2266๏บ๏ป ๏ฉ0.1247 0.0798 0.0804๏น = j ๏ช๏ช0.0798 0.1369 0.0852๏บ๏บ ๏ช๏ซ0.0804 0.0852 0.1280๏บ๏ป 279 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 10.48 From the results of Problem 10.47, Z11− 0 = j 0.08158, Z11−1 = j 0.1223 and Z11− 2 = j 0.1247 per unit are the same as the Thévenin equivalent sequence impedances at bus 1 as calculated in Problem 10.4(b). Therefore the fault currents calculated from the sequence impedance matrices will be the same as those calculated in problems 10.4(c) and 10.19(a) through 10.19(d). 10.49 Zero sequence bus impedance matrix: Step (1): Add Z b = j 0.24 from the reference to bus 1 (type 1) Zbus −0 = j ๏0.24๏ per unit Step (2): Add Z b = j 0.6 from bus 1 to bus 2 (type 2) ๏ฉ0.24 0.24 ๏น Z bus − 0 = j ๏ช ๏บ per unit ๏ซ0.24 0.84 ๏ป Step (3): Add Z b = j 0.6 from bus 2 to bus 3 (type 2) ๏ฉ0.24 0.24 0.24 ๏น Z bus −0 = j ๏ช๏ช0.24 0.84 0.84 ๏บ๏บ per unit ๏ช๏ซ0.24 0.84 1.44 ๏บ๏ป Step (4): Add Z b = j 0.10 from the reference to bus 3 (type 3) ๏ฉ.24 .24 .24 ๏น ๏ฉ .24 ๏น j ๏ช ๏ช ๏บ Z bus −0 = j ๏ช.24 .84 .84 ๏บ − .84 ๏บ๏บ ๏.24 .84 1.44๏ ๏ช 1.54 ๏ช๏ซ.24 .84 1.44๏บ๏ป ๏ช๏ซ1.44๏บ๏ป ๏ฉ 0.2026 0.1091 0.01558๏น Z bus −0 = j ๏ช๏ช 0.1091 0.3818 0.05455๏บ๏บ per unit ๏ช๏ซ0.01558 0.05455 0.09351๏บ๏ป Step (5): Add Z b = j 0.6 from bus 2 to bus 4 (type 2) ๏ฉ 0.2026 0.1091 0.01558 0.1091 ๏น ๏ช 0.1091 0.3818 0.05455 0.3818 ๏บ ๏บ per unit Z bus −0 = j ๏ช ๏ช0.01558 0.05455 0.09351 0.05455๏บ ๏ช ๏บ ๏ช๏ซ 0.1091 0.3818 0.05455 0.9818 ๏บ๏ป Step (6): Add Z b = j 0.1333 from the reference bus to bus 4 (type 3) ๏ฉ.2026 .1091 .01558 .1091 ๏น ๏ฉ .1091 ๏น ๏ช.1091 .3818. .05455 .3818 ๏บ ๏ช ๏บ ๏บ − j ๏ช .3818 ๏บ ๏.1091 .3818 .05455 .9818๏ Z bus −0 = j ๏ช ๏ช.01558 .05455 .09351 .05455๏บ 1.1151 ๏ช.05455๏บ ๏ช ๏บ ๏ช ๏บ ๏ซ๏ช .9818 ๏ป๏บ ๏ซ๏ช.1091 .3818 .05455 .9818 ๏ป๏บ 280 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฉ 0.1919 0.07175 0.01024 0.01304 ๏น ๏ช 0.07175 0.2511 0.03587 0.04564 ๏บ ๏บ per unit Z bus −0 = j ๏ช ๏ช0.01024 0.03587 0.09084 0.006521๏บ ๏ช ๏บ ๏ช๏ซ0.01304 0.04564 0.006521 0.1174 ๏บ๏ป Positive sequence bus impedance matrix can be obtained as: ๏ฉ 0.2671 ๏ช 0.1505 Z bus −1 = j ๏ช ๏ช 0.0865 ๏ช ๏ช๏ซ0.0980 0.1505 0.0865 0.0980 ๏น 0.1975 0.1135 0.1286 ๏บ๏บ per unit 0.1135 0.1801 0.0739 ๏บ ๏บ 0.1286 0.0739 0.2140 ๏บ๏ป Negative sequence bus impedance matrix: Steps (1)–(4) are the same as for Z bus −1 Step (5): Add Z b = j 0.3 from the reference bus to bus 3 (type 3) ๏ฉ.64 ๏ช.64 Z bus − 2 = j ๏ช ๏ช.64 ๏ช ๏ช๏ซ.64 .64 .64 .64 ๏น ๏ฉ .64 ๏น ๏บ ๏ช ๏บ .84 .84 .84 ๏บ j ๏ช .84 ๏บ − ๏.64 .84 1.04 .84๏ .84 1.04 .84 ๏บ 1.34 ๏ช1.04๏บ ๏บ ๏ช ๏บ .84 .84 1.04๏บ๏ป ๏ช๏ซ .84 ๏บ๏ป ๏ฉ.3343 ๏ช.2388 Z bus −2 = j ๏ช ๏ช.1433 ๏ช ๏ซ๏ช.2388 .2388 .1433 .2388๏น .3134 .1881 .3134 ๏บ๏บ per unit .1881 .2328 .1881๏บ ๏บ .3134 .1881 .5134 ๏ป๏บ Step (6): Add Z b = j 0.3733 from the reference to bus 4 (type 3) ๏ฉ.3343 ๏ช.2388 Z bus − 2 = j ๏ช ๏ช.1433 ๏ช ๏ซ๏ช.2388 .2388 .3134 .1881 .3134 ๏ฉ 0.2700 ๏ช 0.1544 Z bus −2 = j ๏ช ๏ช0.09264 ๏ช ๏ช๏ซ 0.1005 .1433 .1881 .2328 .1881 .2388๏น ๏ฉ.2388๏น ๏บ ๏ช ๏บ .3134 ๏บ j ๏ช.3134๏บ − ๏.2388 .3134 .1881 .5134๏ .1881๏บ .8867 ๏ช.1881๏บ ๏บ ๏ช ๏บ .5134 ๏ป๏บ ๏ซ๏ช.5134๏ป๏บ 0.1005 ๏น 0.2026 0.1216 0.1319 ๏บ๏บ per unit 0.1216 0.1929 0.07919๏บ ๏บ 0.1319 0.07919 0.2161 ๏บ๏ป 0.1544 0.09264 10.50 From the results of Problem 10.49, Z11−0 = j 0.1919, Z11−1 = j 0.2671 , and Z11−2 = j 0.2700 per unit are the same as the Thévenin equivalent sequence impedances at bus 1, as calculated in Problem 10.6. Therefore, the fault currents calculated from the sequence impedance matrices are the same as those calculated in Problems 10.7, 10.21–10.23. 281 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 10.51 Zero sequence bus impedance matrix: Working backwards from bus 4: Step (1): Add Z b = j 0.1 from the reference bus to bus 4 (type 1) 4 Z bus −0 = ๏ j 0.1๏ 4 per unit Step (2): Add Z b = j 0.5251 from bus 4 to bus 3 (type 2) 3 4 ๏ฉ0.6251 0.1๏น 3 Z bus − 0 = j ๏ช per unit 0.1๏บ๏ป 4 ๏ซ 0.1 Step (3): Add Z b = j 0.5251 from bus 3 to bus 2 (type 2) 2 3 4 ๏ฉ1.1502 0.6251 0.1๏น 2 Z bus −0 = j ๏ช๏ช0.6251 0.6251 0.1๏บ๏บ 3 per unit ๏ช๏ซ 0.1 0.1 0.1๏บ๏ป 4 Step (4): Add Z b = j 0.2 from bus 2 to bus 1 (type 2) 1 2 3 4 ๏ฉ1.3502 1.1502 0.6251 0.1๏น 1 ๏ช1.1502 1.1502 0.6251 0.1๏บ 2 ๏บ per unit Z bus − 0 = j ๏ช ๏ช0.6251 0.6251 0.6251 0.1๏บ 3 ๏ช ๏บ 0.1 0.1 0.1๏บ๏ป 4 ๏ช๏ซ 0.1 Step (5): Add Z b = j 0.1 from the reference to bus 5 (type 1) ๏ฉ1.3502 1.1502 0.6251 0.1 0 ๏น ๏ช1.1502 1.1502 0.6251 0.1 0 ๏บ ๏ช ๏บ Z bus −0 = j ๏ช0.6251 0.6251 0.6251 0.1 0 ๏บ per unit ๏ช ๏บ 0.1 0.1 0.1 0 ๏บ ๏ช 0.1 ๏ช๏ซ 0 0 0 0 0.1๏บ๏ป Positive sequence bus impedance matrix can be obtained as: ๏ฉ0.3542 ๏ช0.2772 ๏ช Z bus −1 = j ๏ช0.1964 ๏ช ๏ช 0.1155 ๏ช๏ซ0.0770 0.2772 0.1964 0.1155 0.0770 ๏น 0.3735 0.2645 0.1556 0.1037 ๏บ๏บ 0.2645 0.3361 0.1977 0.1318 ๏บ per unit ๏บ 0.1556 0.1977 0.2398 0.1599 ๏บ 0.1037 0.1318 0.1599 0.1733 ๏บ๏ป Negative sequence bus impedance matrix: Steps (1) – (5) are the same as for Z bus −1 Step (6): Add Z b = j 0.23 from the reference bus to bus 5 (type 3) 282 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฉ.576 .576 .576 .576 .576 ๏น ๏ฉ .576 ๏น ๏ช.576 .776 .776 .776 .776 ๏บ ๏ช .776 ๏บ ๏ช ๏บ ๏บ j ๏ช ๏ช .986 ๏บ ๏.576 .776 .986 1.196 1.296๏ Z bus − 2 = j ๏ช.576 .776 .986 .986 .986 ๏บ − ๏ช ๏บ 1.526 ๏ช ๏บ ๏ช.576 .776 .986 1.196 1.196 ๏บ ๏ช1.196 ๏บ ๏ช๏ซ.576 .776 .986 1.196 1.296 ๏บ๏ป ๏ช๏ซ1.296 ๏บ๏ป ๏ฉ 0.3586 ๏ช 0.2831 ๏ช Z bus −2 = j ๏ช 0.2038 ๏ช ๏ช 0.1246 ๏ช๏ซ0.08682 0.2831 0.2038 0.1246 0.08682 ๏น 0.3814 0.2746 0.1678 0.1170 ๏บ๏บ 0.2746 0.3489 0.2132 0.1486 ๏บ per unit ๏บ 0.1678 0.2132 0.2586 0.1803 ๏บ 0.1170 0.1486 0.1803 0.1953 ๏บ๏ป 10.52 From the results of Problem 10.51 Z11−0 = j1.3502, Z11−1 = j 0.3542, and Z11−2 = j 0.3586 per unit are the same as the Thévenin equivalent sequence impedances at bus 1, as calculated in Problem 10.9. Therefore, the fault currents calculated from the sequence impedance matrices are the same as those calculated in Problem 10.10, 10.24–10.27. 10.53 (a) & (b) Either by inverting YBUS or by the building algorithm Z BUS can be obtained as (1) (1) ๏ฉ j 0.0793 (2) ๏ช๏ช j 0.0558 Z BUS = (3) ๏ช j 0.0382 ๏ช (4) ๏ช j 0.0511 (5) ๏ช๏ซ j 0.0608 (2) (3) (4) (5) j 0.0558 j 0.0382 j 0.0511 j 0.1338 j 0.0664 j 0.0630 j 0.0664 j 0.0875 j 0.0720 j 0.0630 j 0.0720 j 0.2321 j 0.0605 j 0.0603 j 0.1002 j 0.0608๏น j 0.0605๏บ๏บ j 0.0603๏บ ๏บ j 0.1002 ๏บ j 0.1301๏บ๏ป (c) Thévenin equivalent circuits to calculate voltages at bus (3) and bus (5) due to fault at bus (4) are shown below: 283 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Simply by closing 8, the subtransient current in the 3-phase fault at bus (4) is given by I ๏ข๏ขf = 1.0 = − j 4.308 j 0.2321 The voltage at bus (3) during the fault is V3 = Vf − I ๏ข๏ขf Z34 = 1 − ( − j 4.308 )( j 0.0720 ) = 0.6898 The voltage at bus (5) during the fault is V5 = Vf − I ๏ข๏ขf Z54 = 1 − ( − j 4.308)( j 0.1002 ) = 0.5683 Currents into the fault at bus (4) over the line impedances are From bus (3): 0.6898 = − j 2.053 j 0.336 From bus (5): 0.5683 = − j 2.255 j 0.252 Hence, total fault current at bus (4) = − j 4.308pu 10.54 The impedance of line (1)–(2) is Z b = j 0.168 . Z BUS is given in the solution of Problem 10.53. The Thévenin equivalent circuit looking into the system between buses (1) and (2) is shown below: Z kk ,Th = j 0.168 + ( j 0.0235)( − j 0.09 ) + j 0.0558 = j 0.2556 j ( 0.0235 − 0.09 ) 284 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏Subtransient current into line-end fault I ๏ข๏ขf = 1/ j 0.2556 = − j3.912pu 10.55 (a) Negative-sequence network is same as above without sources. (1) (1) ๏ฉ j 0.1437 (2) ๏ช๏ช j 0.1211 Z BUS1 = Z BUS 2 = (3) ๏ช j 0.0789 ๏ช (4) ๏ช๏ซ j 0.0563 (1) (1) ๏ฉ j 0.19 (2) ๏ช๏ช 0 Z BUS 0 = (3) ๏ช 0 ๏ช (4) ๏ช๏ซ 0 (2) (3) (4) j 0.1211 j 0.0789 j 0.1696 j 0.1104 j 0.1104 j 0.1696 j 0.0789 j 0.1211 j 0.0563 ๏น j 0.0789 ๏บ๏บ j 0.1211 ๏บ ๏บ j 0.1437 ๏บ๏ป (2) (3) (4) 0 0 j 0.08 j 0.08 j 0.08 j 0.58 0 0 0 ๏น 0 ๏บ๏บ 0 ๏บ ๏บ j 0.19 ๏บ๏ป (b) For the line-to-line fault, Thévenin equivalent circuit: Upper case A is used because fault is in the HV-transmission line circuit. I fA 1 = − I fA 2 = 1๏0๏ฐ = − j 2.9481 j 0.1696 + j 0.1696 I fA = I fA 1 + I fA 2 = 0 I f B = a 2 I fA 1 + aI fA 2 = −5.1061 + j 0 = 855๏180๏ฐ A I f C = − I f B = 5.1061 + j 0 = 855๏0๏ฐ A 285 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Base current in HV transmission line is 100,000 3 ๏ด 345 = 167.35A Symmetrical components of phase-A voltage to ground at bus (3) are V3 A 0 = 0; V3 A 1 = V3 A 2 = 1 − ( j 0.1696 )( − j 2.9481) = 0.5 + j 0 Line-to-Ground voltages at fault bus (3) are V3 A = V3 A 0 + V3 A 1 + V3 A 2 = 0 + 0.5 + 0.5 = 1๏0๏ฐ V3 B = V3 A 0 + a2V3 A 1 + aV3 A 2 = 0.5๏180๏ฐ V3C = V3 B = 0.5๏180๏ฐ Line-to-line voltages at fault bus (3) are V3, AB = V3 A − V3 B = 1.5๏0๏ฐ = 1.5 ๏ด 345 3 = 299๏0๏ฐ kV V3, BC = V3 B − V3C = 0 V3,CA = V3C − V3 A = 1.5๏180๏ฐ = 299๏180๏ฐ kV Avoiding, for the moment, phase shifts due to ๏ − Y transformer connected to machine 2, sequence voltages of phase A at bus (4) using the bus-impedance matrix are calculated as V4 A0 = − Z 430 I fA0 = 0 V4 A1 = Vf − Z431 I fA1 = 1 − ( j 0.1211)( − j 2.9481) = 0.643 V4 A2 = − Z432 I fA2 = − ( j 0.1211)( j 2.9481) = 0.357 Accounting for phase shifts V4 a 1 = V4 A 1๏ − 30๏ฐ = 0.643๏ − 30๏ฐ = 0.5569 − j 0.3215 V4 a 2 = V4 A 2 ๏30๏ฐ = 0.357๏30๏ฐ = 0.3092 + j 0.1785 V4 a = V4 a 0 + V4 a 1 + V4 a 2 = 0.8661 − j 0.143 = 0.8778๏ − 9.4๏ฐ Phase-b voltages at terminals of machine 2 are V4 b 0 = V4 a 0 = 0 V4b 1 = a2V4 a 1 = 0.643๏240๏ฐ − 30๏ฐ = −0.3569 − j 0.3215 V4b 2 = aV4 a 2 = 0.357๏120๏ฐ + 30๏ฐ = −0.3092 + j 0.1785 V4b = V4b 0 + V4b 1 + V4b 2 = −0.8661 − j 0.143 = 0.8778๏ − 170.6๏ฐ For phase C of machine 2, V4 c 0 = V4 a 0 = 0 286 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. V4 c 1 = aV4 a 1 = 0.643๏90๏ฐ; V4 c 2 = a2V4 a 2 = 0.357๏ − 90๏ฐ V4 c = V4 c 0 + V4 c 1 + V4 c 2 = j 0.286 Line-to-line voltages at terminals of machine 2 are given by V4,ab = V4 a − V4 b = 1.7322 + j 0 = 1.7322 ๏ด 20 3 = 20๏0๏ฐ kV V4,bc = V4 b − V4 c = −0.8661 − j 0.429 = 0.9665๏ − 153.65๏ฐ = 11.2 kV ๏ − 153.65๏ฐ V4,ca = V4 c − V4 a = −0.8661 + j 0.429 = 0.9665๏153.65๏ฐ = 11.2 kV ๏153.65๏ฐ (c) For the double line-to-line fault, connection of Thévenin equivalents of sequence networks is shown below: I fa1 = 1๏0๏ฐ = − j 4.4342 j 0.1437 ( j 0.19 ) j 0.1437 + j ( 0.1437 + 0.19 ) Sequence voltages at the fault are V4 a1 = V4 a 2 = V4 a 0 = 1 − ( − j 4.4342 )( j 0.1437 ) = 0.3628 I fa 2 = j 4.4342 j 0.19 = j 2.5247 j ( 0.1437 + 0.19 ) I fa 0 = j 4.4342 j 0.1437 = j1.9095 j ( 0.1437 + 0.19 ) Currents out of the system at the fault point are I fa = I fa 0 + I fa 1 + I fa 2 = 0 I fb = I fa 0 + a2 I fa 1 + aI fa 2 = −6.0266 + j 2.8642 = 6.6726๏154.6๏ฐ I fc = I fa 0 + aI fa 1 + a2 I fa 2 = 6.0266 + j 2.8642 = 6.6726๏25.4๏ฐ Current I f into the ground is I f = I fb + I fc = 3I fa 0 = j 5.7285 a-b-c voltages at the fault bus are 287 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. V4 a = V4 a 0 + V4 a 1 + V4 a 2 = 3V4 a 1 = 3 ( 0.3628) = 1.0884 V4 b = V4 c = 0 V4,ab = V4 a − V4 b = 1.0884; V4,bc = V4 b − V4 c = 0; V4,ca = V4 c − V4 a = −1.0884 Base current = 100 ๏ด 103 3 ๏ด 20 = 2887 A ๏ I fa = 0; I fb = 19.262๏154.6๏ฐ kA; I fc = 19.262 ๏25.4๏ฐ kA I f = 16.538๏90๏ฐ kA Base line-to-neutral voltage in machine 2 is 20 / 3 kV ๏V4,ab = 12.568๏0๏ฐ kV; V4,bc = 0; V4,ca = 12.568๏180๏ฐ kV 10.56 (a) Z BUS 1 and Z BUS 2 are same as in the solution of Problem 10.51. However, because the transformers are solidly grounded on both sides, the zero-sequence network is changed as shown below: For the single line-to-ground fault, series connection of the Thévenin equivalents of the sequence networks is shown below: (1) (1) ๏ฉ j 0.1553 (2) ๏ช๏ช j 0.01407 Z BUS 0 = (3) ๏ช j 0.0493 ๏ช (4) ๏ซ๏ช j 0.0347 (2) (3) (4) j 0.1407 j 0.0493 j 0.1999 j 0.0701 j 0.0701 j 0.1999 j 0.0493 j 0.1407 j 0.0347 ๏น j 0.0493 ๏บ๏บ j 0.1407 ๏บ ๏บ j 0.1553 ๏ป๏บ (b) I fA 0 = I fA1 = I fA 2 = 1๏0๏ฐ j ( 0.1696 + 0.1696 + 0.1999 ) = − j1.8549 I fA = 3I fA 0 = − j 5.5648 = 931๏270๏ฐ A Base current in HV trans. line is 288 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 100,000 3 ๏ด 345 = 167.35A Phase-a sequence voltages at bus (4), terminals of machine 2, are V4 a 0 = − Z 430 I fA0 = − ( j 0.1407 )( − j1.8549 ) = −0.2610 V4 a1 = 1 − ( j 0.1211)( − j1.8549 ) = 0.7754 ๏ฉ๏ซ = V f − Z 431 I fA1 ๏น๏ป V4 a 2 = − ( j 0.1211)( − j1.8549 ) = −0.2246 ๏ฉ๏ซ = − Z 432 I fA2 ๏น๏ป Note: Subscripts A and a denote HV and LV circuits, respectively, of the Y-Y connected transformer. No phase shift is involved. ๏ฉV4 a ๏น ๏ฉ1 1 ๏ช ๏บ ๏ช 2 ๏ชV4 b ๏บ = ๏ช1 a ๏ชV4 c ๏บ ๏ช๏ซ1 a ๏ซ ๏ป 1 ๏น ๏ฉ −0.2610 ๏น ๏ฉ0.2898 + j 0 ๏น ๏ฉ0.2898๏0๏ฐ ๏น ๏บ ๏ช ๏บ ๏ช a ๏บ ๏ช +0.7754 ๏บ = ๏ช −0.5364 − j 0.866 ๏บ๏บ = ๏ช๏ช1.0187๏ − 121.8๏ฐ๏บ๏บ a 2 ๏บ๏ป ๏ช๏ซ −0.2246 ๏บ๏ป ๏ช๏ซ −0.5364 + j 0.866 ๏บ๏ป ๏ช๏ซ1.0187๏121.8๏ฐ ๏บ๏ป Line-to-ground voltages of machine 2 in kV are: (Multiply by 20 3) V4 a = 3.346๏0๏ฐ kV; V4 b = 11.763 ๏ − 121.8 kV; V4 c = 11.763๏121.8๏ฐ kV Symmetrical components of phase-a current are Ia0 = − I a1 = V4 a 0 0.2610 = = − j 6.525 jX 0 j 0.04 V f − V4 a1 Ia2 = − jX ๏ข๏ข = 1.0 − 0.7754 = − j1.123 j 0.2 V4 a 2 0.2246 = = − j1.123 jX 2 j 0.2 The phase-c currents in machine 2 are calculated as I c = I a 0 + aI a1 + a 2 I a 2 = − j 6.525 + a ( − j1.123 ) + a 2 ( − j1.123 ) = − j 5.402 Base current in the machine circuit is 100 ๏ด 103 3 ( 20 ) = 2886.751A ๏ I c = 15,594 A 10.57 Using equations (10.5.9) in (8.1.3), the phase “a” voltage at bus k for a fault at bus n is: Vka = Vk -0 + Vk -1 + Vk -2 = VF − ( Z kn-0 I n −0 + Z kn −1I n −1 + Z kn −2 I n 2 ) For a single line-to-ground fault, (9.5.3), 289 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. I n −0 = I n −1 = I n −2 = VF Z nn −0 + Z nn −1 + Z nn −2 + 3Z F Therefore, ๏ฉ ๏น Z kn −0 + Z kn −1 + Z kn −2 Vka = VF ๏ช1 − ๏บ ๏ซ Z nn −0 + Z nn −1 + Z nn −2 + 3Z F ๏ป The results in Table 10.5 for Example 10.8 neglect resistance of all components (machines, transformers, transmission lines). Also the fault impedance Z F is zero. As such, the impedance in the above equation all have the same phase angle (90), and the phase “a” voltage Vka therefore has the same angle as the pre-fault voltage VF , which is zero degrees. Note also that pre-fault load currents are neglected. Note, the PowerWorld problems in Chapter 10 were solved ignoring the effect of the ๏ − Y transformer phase shift [see Example 10.6]. An upgraded version of PowerWorld Simulator is available from www.powerworld.com/gloversarma that (optionally) allows inclusion of this phase shift. 10.58 During a double line-to-ground fault the bus 2 voltage on the unfaulted phase rises to 1.121 per unit and the fault point voltage raises to 1.252 per unit. 10.59 Bus 2 Phase A Voltage Bus 2 Phase B Voltage 10.60 For a line-to-line fault the magnitude of the per unit fault currents are 125,121 A for a bus 1 fault, 2,672 A for a bus 2 fault, 8,341 A for a bus 3 fault, 6,443 A for a bus 4 fault, and 5,163 A for a bus 5 fault. All values are lower than for the single line-to-ground case, except at bus 2 it is slightly higher. 290 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 10.61 For a double line-to-ground fault the magnitude of the per unit fault currents are 228,878 A for a bus 1 fault, 1,918 A for a bus 2 fault, 12,190 A for a bus 3 fault, 12,703 A for a bus 4 fault, and 8,943 A for a bus 5 fault. All values are higher than for the single line-to-ground case, except at bus 2 the DLG current is somewhat lower. 10.62 For the Example 10.8 case with a second line between buses 2 and 4, the magnitude of the per unit fault currents for a single line-to-ground fault are 46.137 for a bus 1 fault, 19.458 for a bus 2 fault, 64.360 for a bus 3 fault, 56.183 for a bus 4 fault, and 42.414 for a bus 5 fault. All values are higher than for the Example 10.8 case since the extra line decreases the overall system impedance. However, the change is really only significant for the bus 2 fault. 10.63 For the Example 10.8 case with a second generator added at bus 3, the magnitude of the per unit fault currents for a single line-to-ground fault are 48.545 for a bus 1 fault, 14.74 for a bus 2 fault, 119.322 for a bus 3 fault, 73.167 for a bus 4 fault, and 46.817 for a bus 5 fault. All values are higher than for the Example 10.8 case since the extra generator provides an additional source of fault current. The change is most dramatic for the bus 3 fault since the fault current is not limited by the step-up transformer. Of course, if a second generator were added at a location, undoubtedly a second step-up transformer would also be added. 10.64 For a fault at the ORANGE69 bus the magnitude of the per unit fault current is 15.122. The amount supplied by each of the generators is given below. During the fault 16 buses have their “a” phase voltages below 0.75 per unit. None of the “b” or “c” phases are below 0.75 per unit. Number of Name of Phase Cur Phase Cur Phase Cur Phase Phase Phase Bus Bus A B C Ang A Ang B Ang C 14 REDBUD69 0.00000 0.00000 0.00000 0.00 0.00 0.00 50 BIRCH69 0.89944 0.22944 0.48395 -73.41 -152.86 80.20 48 CEDAR69 1.59080 0.66251 0.32882 -94.16 -87.52 -100.19 28 ELM345 1.62440 1.08826 1.82367 -44.42 -142.50 99.37 28 ELM345 1.62440 1.08826 1.82367 -44.42 -142.50 99.37 53 PEAR138 2.52518 1.09055 2.28376 -76.13 168.61 78.29 44 PEACH69 2.71598 0.33630 0.47639 -96.92 -124.25 -19.25 31 SLACK345 3.01057 1.62359 3.04381 -62.65 -167.07 86.25 54 PEAR69 5.35004 2.79977 1.27050 -95.91 -115.38 -101.55 291 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 10.65 For a fault at the POPULAR69 bus the magnitude of the per unit fault current is 8.272. The amount supplied by each of the generators is given below. During the fault 6 buses have their “a” phase voltages below 0.75 per unit. None of the “b” or “c” phases are below 0.75 per unit. Number Name of Bus of Bus Phase Cur Phase Cur Phase Cur Phase Phase Phase A B C Ang A Ang B Ang C 14 REDBUD69 0.00000 0.00000 0.00000 0.00 0.00 0.00 48 CEDAR69 0.43570 0.25204 0.14654 -72.62 -91.08 141.29 50 BIRCH69 0.60286 0.28865 0.46673 -61.51 -157.17 86.60 28 ELM345 1.53183 1.22198 1.69349 -33.65 -138.69 102.18 28 ELM345 1.53183 1.22198 1.69349 -33.65 -138.69 102.18 54 PEAR69 1.73205 1.10874 0.57668 -72.16 -139.16 84.36 53 PEAR138 1.78585 1.30925 1.76086 -55.50 -168.17 81.18 31 SLACK345 2.60138 1.87442 2.68988 -49.93 -158.12 88.62 292 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Chapter 11 System Protection 11.1 Using Eq. (11.2.1): 1 345 ๏ด 103 V๏ข = V = = 115 V (line-to-line) n 3000 S3๏ฆ 700. ๏ด 106 I= = = 1171.44 A 3 VLL 3 ( 345 ๏ด 103 ) ( ) From Eq. (11.2.2), Ie = 0 for zero CT error. Then, from Figure 11.7: I ๏ข + Ie = I ๏ข + 0 = 1 ๏ฆ 5 ๏ถ I =๏ง ๏ท (1171.44 ) n ๏จ 1200 ๏ธ I ๏ข = 4.88 A 11.2 (a) Step (1) – I๏ข = 10 A Step (2) – From Figure 11.7, E ๏ข = ( Z ๏ข + Z B ) I ๏ข = ( 0.082 + 1)(10 ) = 10.82 V Step (3) – From Figure 11.8, Ie = 0.6 A Step (4) – From Figure 11.7, ๏ฆ 100 ๏ถ I =๏ง ๏ท (10 + 0.6 ) = 212 A ๏จ 5 ๏ธ (b) Step (1) – I๏ข = 13 A Step (2) – From Figure 11.7, E ๏ข = ( Z ๏ข + Z B ) I ๏ข = ( 0.082 + 1.3 )(13 ) = 18.0 V Step (3) – From Figure 11.8, Ie = 1.8 A Step (4) – From Figure 11.7, ๏ฆ 100 ๏ถ I =๏ง ๏ท (13 + 1.8) = 296 A ๏จ 5 ๏ธ 293 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (c) I๏ข 5. 8. 10. 13. 15. I 105. 168. 212. 296. 700. (d) With a 5-A tap setting and a minimum fault-to-pickup ratio of 2, the minimum relay trip current for reliable operation is I๏ขmin = 2 ๏ด 5 = 10 A. From (a) above with I๏ขmin = 10 A, I min = 212 A . That is, the relay will trip reliably for fault currents exceeding 212 A. 11.3 From Figure 11.8, the secondary resistance Z ๏ข = 0.125 ๏ for the 200:5 CT. (a) Step (1) – I๏ข = 10 A Step (2) – E = ( Z ๏ข + Z B ) I ๏ข = ( 0.146 + 1)(10 ) = 11.46 V Step (3) – From Figure 11.8, Ie = 0.11 A ๏ฆ 250 ๏ถ Step (4) – I = ๏ง ๏ท (10 + 0.11) = 505.5A ๏จ 5 ๏ธ (b) Step (1) – I๏ข = 10 A Step (2) – E = ( Z ๏ข + Z B ) I ๏ข = ( 0.146 + 4 )(10 ) = 41.46 V Step (3) – From Figure 11.8, Ie = 0.55 A ๏ฆ 250 ๏ถ Step (4) – I = ๏ง ๏ท (10 + 0.55 ) = 527.5 A ๏จ 5 ๏ธ (c) Step (1) – I๏ข = 10. A Step (2) – E = ( Z ๏ข + Z B ) I ๏ข = ( 0.146 + 5 )(10 ) = 51.46 V Step (3) – From Figure 11.8, Ie = 0.7 A ๏ฆ 250 ๏ถ Step (4) – I = ๏ง ๏ท (10 + 0.7 ) = 535 A ๏จ 5 ๏ธ 294 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 11.4 (a) N1 N 2 = 240,000 120 = 2000 1 ๏Vab = 230,000๏0๏ฐ 2000 = 115๏0๏ฐ Vbc = 230,000๏ − 120๏ฐ 2000 = 115๏ − 120๏ฐ Vca = − (Vab + Vbc ) = − (115๏ − 60๏ฐ ) = 115๏ + 120๏ฐ (b) Vab = 115๏0๏ฐ; but now Vbc = −115๏ − 120๏ฐ = 115๏60๏ฐ ๏Vca = − (Vab + Vbc ) = 199๏150๏ฐ The output of the PT bank is not balanced three phase. 11.5 Designating secondary voltage as E2, read two points on the magnetization curve (Ie, E2) = (1, 63) and (10, 100). The nonlinear characteristic can be represented by the so-called Frohlich equation E2 = ( AI e ) ( B + I e ) , using that 63 = A 10 A and 100 = B +1 B + 10 Solve for A and B: A = 107 and B = 0.698 For parts (a) and (b), ZT = ( 4.9 + 0.1) + j ( 0.5 + 0.5 ) = 5 + j1 = 5.099๏11.3๏ฐ ๏ (a) The CT error is the percentage of mismatch between the input current (in secondary terms) denoted by I 2๏ข and the output current I 2 in terms of their magnitudes: CT error = I 2๏ข − I 2 I 2๏ข ๏ด 100 ET = I 2๏ข ZT = 4 ( 5.099 ) = 20.4 I e = 20.4 25 + ๏ฉ๏ซ1 + 107 ( 0.698 + I e ) ๏น๏ป = 0.163 (by iteration) 2 From Frohlich’s equation E2 = 0.163 (107 ) = 20.3 0.698 − 0.163 E 20.3 I2 = 2 = = 3.97 Z T 5.099 CT error = 0.03 = 0.7% 4 295 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (b) For the faulted case ET = 12 ( 5.099 ) = 61.2 V; I e = 0.894 A (by iteration) E2 = 60.1 V; I 2 = 60.1 5.099 = 11.78 A CT error = 0.22 ๏ด 100 = 1.8% 12 (c) For the higher burden, ZT = 15 + j 2 = 15.13๏7.6๏ฐ ๏ For the given load condition, ET = 4 (13.13) = 60.5 V I e = 0.814 A; E2 = 57.6 V; I 2 = ๏ CT error = 57.6 = 3.81 A 15.13 0.19 ๏ด 100 = 4.8% 4 (d) For the fault condition, ET = 181.6 V; I e = 9.21 A; E2 = 99.5 V; I 2 = 99.5 = 6.58 A 15.13 ๏ CT error = 5.42 ๏ด 100 = 45.2% 12 Thus, CT error increases with increasing CT current and is further increased by the high terminating impedance. 11.6 Assuming the CT to be ideal, I2 would be 12 A; the device would detect the 1300–A primary current (or any fault current down to 800 A) independent of Z L . (a) In the solution of Problem 11.5(b), I2 = 11.78 A. Therefore, the fault is detected. (b) In Problem 11.5(d), I2 = 6.58 A. The fault is then not detected. The assumption that the CT was ideal in this case would have resulted in failing to detect a faulted system. 11.7 (a) The current tap setting (pickup current) is Ip = 1.0 A. I ๏ข 10 = = 10. From curve ½ in Figure 11.12 Ip 1 toperating = 0.08 s (b) I ๏ข 10 = = 5. Interpolating between curve 1 and curve 2 in Figure 11.12, toperating = 0.55 s Ip 2 (c) I ๏ข 10 = = 5. From curve 7, toperating = 3 s Ip 2 296 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (d) I ๏ข 10 = = 3.33 From curve 7, toperating = 5.2 s Ip 3 (e) I ๏ข 10 = ๏ผ 1 . The relay does not operate. It remains in the blocking position. I p 12 11.8 From the plot of I๏ข vs I in Problem 11.2(c), I ๏ข = 13 A. I ๏ข 13 = = 3.25 Ip 4 From curve 4 in Figure 11.12, toperating = 2.8 s 11.9 (a) ๏ด = RC = 0.1 s v0 = 2 (1 − e−t /0.1 ) ; at t = Tdelay, V0 = 1 ๏1 − e−Tdelay /0.1 = 0.5 or eTdelay /0.1 = 2 Thus Tdelay = 0.1 ๏ ln 2 = 0.0693 s (b) ๏ด = RC = 1s v0 = 2 (1 − e−t ) ; at t = Tdelay, V0 = 1 ๏ eTdelay = 2 or Tdelay = ln 2 Thus Tdelay = 0.693 s The circuit time response is sketched below: 11.10 From the solution of Prob. 11.5(b), I2 = Irelay = 11.78 A I relay I pickup = 11.78 = 2.945 corresponding to which, from curve 2, Toperating = 0.9 s 4 11.11 (a) For the 700. A fault current at bus 3, fault-to-pickup current ratios and relay operating times are: B3: I 3๏ข fault TS3 = 700 ( 200 / 5) 3 = 17.5 = 5.83 3 297 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. From curve ½ of Figure 11.12, toperating3 = 0.10 seconds. Adding the breaker operating time, primary protection clears this fault in (0.10 + 0.083) = 0.183 seconds. B2 : I 2๏ข fault TS 2 = 700 ( 200 / 5 ) = 5 17.5 = 3.5 5 From curve 2 in Figure 11.12, toperating2 = 1.3 seconds. The coordination time interval between B3 and B2 is (1.3 − 0.183) = 1.12 seconds. (b) For the 1500-A fault current at bus 2: B2: I 2๏ข fault TS 2 = 1500 ( 200 / 5) 5 = 37.5 = 7.5 5 From curve 2 of Figure 11.12, toperating2 = 0.55 seconds. Adding the breaker operating time, primary protection clears this fault in (0.55 + 0.083) = 0.633 seconds. I1๏ขfault B1: TS1 = 1500 ( 400 / 5 ) 5 = 18.75 = 3.75 5 From curve 3 of Figure 11.12, toperating1 = 1.8 seconds. The coordination time interval between B2 and B1 is (1.8 − 0.633) = 1.17 seconds. Fault-to-pickup ratios are all ๏พ 2.0 Coordination time intervals are all ๏พ 0.3 seconds. 11.12 First select current Tap settings (TSs). Starting at B3, the primary and secondary CT currents for maximum load L3 are: IL3 = I L๏ข 3 = SL 3 V3 3 = 9 ๏ด 106 34.5 ๏ด 103 3 = 150.6 A 150.6 = 3.77 A ( 200 / 5) From Figure 11.12, select 4-A TS3, which is the lowest TS above 3.77 A. IL2 = I L๏ข 2 = ( SL 2 + SL 3 ) = ( 9.0 + 9.0 ) ๏ด 106 = 301.2 A 34.5 ๏ด 103 3 V2 3 301.2 = 3.77 A ( 400 / 5) Again, select 4-A TS2 for B2. I L1 = I L๏ข 1 = SL 1 + SL 2 + SL 3 V1 3 = ( 9 + 9 + 9 ) ๏ด 106 = 451.8 A 34.5 ๏ด 103 3 451.8 = 3.77 ( 600 / 5) 298 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Again select a 4-A TS1 for B1. Next select Time Dial Settings (TDSs). Starting at B3, the largest fault current through B3 is 3000 A, for the maximum fault at bus 2 (just to the right of B3). The fault to pickup ratio at B3 for this fault is I 3๏ข fault = TS3 3000 ( 200 / 5 ) 4 = 18.75 Select TDS = 1 2 at B3, in order to clear this fault as rapidly as possible. Then from curve ½ in Fig. 11.12, toperating3 = 0.05 s. Adding the breaker operating time (5 cycles = 0.083 s), primary protection clears this fault in 0.05 + 0.083 = 0.133 s. For this same fault, the fault-to-pickup ratio at B2 is I 2๏ข fault TS 2 3000 ( 400 / 5 ) = 37.5 = 9.4 4 = 4 Adding B3 relay operating time, breaker operating time, and 0.3 s coordination interval, (0.05 + 0.083 + 0.3) = 0.433 s, which is the desired B2 relay operating time. From Figure 11.12, select TDS2 = 2. Next select the TDS at B1. The largest fault current through B2 is 5000 A, for the maximum fault at bus 1 (just to the right of B2). The fault-to-pickup ratio at B2 for this fault is I 2๏ข fault TS 2 = 5000 ( 400 / 5 ) 4 = 62.5 = 15.6 4 From curve 2 in Fig. 11.12, the relay operating time is 0.38 s. Adding the 0.083 s breaker operating time and 0.3 s coordination time interval, we want a B1 relay operating time of (0.38 + 0.083 + 0.3) = 0.763 s. Also, for this same fault, I1๏ข fault TS1 = 5000 ( 600 / 5 ) 4 = 41.66 = 10.4 4 From Fig. 11.12, select TDS1 = 3.5. Breaker Relay TS TDS B1 CO-8 4 3.5 B2 CO-8 4 2 B3 CO-8 4 ½ Solution Problem 11.7 11.13 For the 1500-A fault current at bus 3, fault-to-pickup current ratios and relay operating times are: B3: I 3๏ข fault TS3 = 1500 ( 200 / 5) 4 = 37.5 = 9.4 4 From curve ½ of Figure 11.12, toperating3 = 0.08 s. Adding breaker operating time, primary relaying clears this fault in 0.08 + 0.083 = 0.163 s. 299 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. B2: I 2๏ข fault TS 2 1500 ( 400 / 5 ) = 4 18.75 = 4.7 4 = From curve 2 in Fig. 11.12, toperating2 = 0.85 s. The coordination time interval between B3 and B2 is (0.85 − 0.163) = 0.69 s. B1: I1๏ขfault TS1 1500 ( 600 / 5 ) = = 4 12.5 = 3.1 4 From curve 3.5 in Fig. 11.12, toperating1 = 2.8 s. The coordination time interval between B3 and B1 is (2.8 − 0.163) = 2.6 s. For the 2250-A fault current at bus 2, fault-to-pickup current ratios and relay operating times are: B2: I 2๏ข fault TS 2 = 2250 ( 400 / 5 ) 4 28.13 = 7.0 4 = From curve 2 in Fig. 11.12, toperating2 = 0.6 s. Adding breaker operating time, primary protection clears this fault in (0.6 + 0.083) = 0.683 s. B1: I1๏ขfault TS1 = 2250 ( 600 / 5) 4 = 18.75 = 4.7 4 From curve 3.5 in Fig. 11.12, toperating1 = 1.5 s. The coordination time interval between B2 and B1 is (1.5 − 0.683) = 0.82 s. Fault-to-pickup ratios are all ๏พ 2.0 Coordination time intervals are all ๏พ 0.3 s 11.14 The load currents are calculated as I1 = 4 ๏ด 106 3 (11 ๏ด 103 ) = 209.95A; I 2 = = 131.22 A; I 3 = 6.75 ๏ด 106 3 (11 ๏ด 103 ) 2.5 ๏ด 106 3 (11 ๏ด 103 ) = 354.28 A The normal currents through the sections are then given by I 21 = I1 = 209.95 A; I 32 = I 21 + I 2 = 341.16 A; I S = I 32 + I 3 = 695.44 A With the given CT ratios, the normal relay currents are i21 = 209.95 341.16 695.44 = 5.25 A; i32 = = 8.53 A; iS = = 8.69 A ( 200 / 5) ( 200 / 5 ) ( 400 / 5 ) 300 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Now obtain CTS (Current Tap Settings) or pickup current in such a way that the relay does not trip under normal currents. For this type of relay, CTS available are 4, 5, 6, 7, 8, 10, and 12 A. For position 1, the normal current in the relay is 5.25 A; so choose (CTS)1 = 6 A. Choosing the nearest setting higher than the normal current. For position 2, normal current being 8.53 A, choose (CTS)2 = 10 A. For position 3, normal current being 8.69 A, choose (CTS)3 = 10 A. Next, select the intentional delay indicated by TDS, time dial setting. Utilize the short-circuit currents to coordinate the relays. The current in the relay at 1 on short circuit is iSC1 = 2500 = 62.5A expressed as a multiple of ( 200 / 5) the CTS or pickup value, iSC 1 62.5 = = 10.42 (CTS )1 6 Choose the lowest TDS for this relay for fastest action. Thus ( TDS )1 = 1 2 Referring to the relay characteristic, the operating time for relay 1 for a fault at 1 is obtained as T11 = 0.15 s. To set the relay at 2 responding to a fault at 1, allow 0.15 for breaker operation and an error margin of 0.3 s in addition to T11. Thus T21 = T11 + 0.1 + 0.3 = 0.55 s Short circuit for a fault at 1 as a multiple of the CTS at 2 is iSC 1 62.5 = = 6.25 CTS ( )2 10 From the characteristics for 0.55 s operating time and 6.25 ratio, (TDS)2 = 2 Now, setting the relay at 3: For a fault at bus 2, the short-circuit current is 3000 A, for which relay 2 responds in a time T22 calculated as iSC 2 3000 = = 7.5 (CTS )2 ( 200 / 5 )10 For (TDS)2 = 2, from the relay characteristic, T22 = 0.5 s. Allowing the same margin for relay 3 to respond for a fault at 2, as for relay 2 responding to a fault at 1, T32 = T22 + 0.1 + 0.3 = 0.9s 301 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. The current in the relay expressed as a multiple of pickup is iSC 2 3000 = = 3.75 (CTS )3 ( 400 / 5 )10 Thus, for T3 = 0.9 s, and the above ratio, from the relay characteristic (TDS)3 = 2.5 Note: Calculations here did not account for higher load starting currents that can be as high as 5 to 7 times rated values. 11.15 (a) Three-phase permanent fault on the load side of bus 3. From Table 11.7, the three-phase fault current at bus 3 is 2000 A. From Figure 11.19, the 560 A fast recloser opens 0.04 s after the 2000 A fault occurs, then recloses ½ s later into the permanent fault, opens again after 0.04 s, and recloses into the fault a second time after a 2 s delay. Then the 560 A delayed recloser opens 1.5 s later. During this time interval, the 100 T fuse clears the fault. The delayed recloser then recloses 5 to 10 s later, restoring service to loads 1 and 2. (b) Single line-to-ground permanent fault at bus 4 on the load side of the recloser. From Table 11.7, the IL-G fault current at bus 4 is 2600 A. From Figure 11.19, the 280 A fast recloser (ground unit) opens after 0.034 s, recloses ½ s later into the permanent fault, opens again after 0.034 s, and recloses a second time after a 2 s delay. Then the 280 A delayed recloser (ground unit) opens 0.7 s later, recloses 5 to 10 s later, then opens again after 0.7 s and permanently locks out. (c) Three-phase permanent fault at bus 4 on the source side of the recloser. From Table 11.7, the three-phase fault at bus 4 is 3000 A. From Figure 11.19, the phase overcurrent relay trips after 0.95 s, thereby energizing the circuit breaker trip coil, causing the breaker to open. 11.16 Load current = 3500 3 ( 34.5 ) = 58.57 A ; max. fault current = 1000 A; min. fault current = 500 A. Note that from Figure 11.19, reclosers have both a fast (assuming no intentional time delay) recloser clearing curve and a time-delayed recloser clearing curve. (a) For this condition, the recloser must open before the fuse melts. The maximum clearing time of the recloser should be less than the minimum melting time of the fuse for all fault currents between 500 and 1000 A. Referring to Figure 11.44, the fuse melt time is about 0.135 s for the 500 A fault, and about 0.029 s for the 1000 A fault. Hence, select a clearing time of 0.029 s for the recloser fast curve. 302 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (b) For this condition, the fuse must open before the recloser operates. The minimum clearing time of the recloser should be greater than the maximum clearing time of the fuse for all fault currents between 500 and 1000 A. Referring to Figure 11.44, the fuse clear time is about 0.4 s for the 500 A fault, and about 0.066 s for the 1000 A fault. Hence, select a clearing time of 0.4 s for the recloser time-delay curve. (c) The fast and time-delayed recloser clearing curves are drawn on the 80E fuse curve as follows; Recloser Time-Delay Clearing Curve Recloser Fast Clearing Curve Note that for the load current of 58.75 A, neither the recloser nor the fuse operates. 11.17 (a) For a fault of P1, only breakers B34 and B43 operate; the other breakers do not operate. B23 should coordinate with B34 so that B34 operates before B23 (and before B12, and before B1). Also, B4 should coordinate with B43 so that B43 operates before B4. (b) For a fault of P2, only breakers B23 and B32 operate; the other breakers do not operate. B12 should coordinate with B23 so that B23 operates before B12 (and before B1). Also B43 should coordinate with B32 so that B32 operates before B43 (and before B4). 303 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (c) For a fault of P3, only breakers B12 and B21 operate; the other breakers do not operate. B32 should coordinate with B21 so that B21 operates before B32 (and before B43, and before B4). Also, B1 should coordinate with B12 so that B12 operates before B1. (d) Fault Bus Operating Breakers 1 B1 and B21 2 B12 and B32 3 B23 and B43 4 B4 and B34 11.18 (a) For a fault at P1, breakers in zone 3 operate (B12a and B21a). (b) For a fault at P2, breakers in zone 7 operate (B21a, B21b, B23, B24a, B24b). (c) For a fault at P3, breakers in zone 6 and zone 7 operate (B23, B32, B21a, B21b, B24a, and B24b). 304 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 11.19 (a) 305 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (b) Scheme Breakers that open for fault on Line 1 Ring Bus B12 and B14 Breaker- and ½, Double Bus B11 and B12 Double Breaker, Double Bus B11 and B21 Scheme Lines Removed for a Fault at P1 Ring Bus Line 1 and Line 2 Breaker- and ½, Double Bus None Double Breaker, Double Bus None Scheme Breakers that open for a Fault on Line 1 (c) (d) with Stuck Breaker Ring Bus B12, B14 and either B23 or B34 Breaker- and ½, Double Bus B11, B12 and either B13 or B22 Double Breaker, Double Bus B11, B21 and all other breakers on bus 1 or bus 2. 11.20 (a) Z๏ข = V ( 4500 / 1) ๏ฆ VLN ๏ถ 1 ๏ข VLN = LN =๏ง ๏ท I L๏ข I L ( 2500 / 5 ) ๏จ I L ๏ธ 9 Z๏ข = Z 9 Set the B12 zone 1 relay for 80% reach of line 1–2: Z r1 = 0.8 ( 6 + j 60 ) 9 = 0.53 + j5.33 ๏ secondary Set the B12 zone 2 relay for 120% reach of line 1–2: Z r 2 = 1.2 ( 6 + j 60 ) 9 = 0.8 + j 0.8 ๏ secondary Set the B12 zone 3 relay for 100% reach of line 1–2 and 120% reach of line 2–3: Z r 3 = 1.0 ( 6 + j 60 ) 9 + 1.2 ( 5 + j50 ) 9 = 1.3 + j13.33 ๏ secondary (b) The secondary impedance viewed by B12 during emergency loading is: 500 ๏ฆ ๏ถ ๏0๏ฐ ๏ง ๏ท1 ๏ฆ VLN ๏ถ ๏ฆ 1 ๏ถ 3 ๏ท = 22.9๏25.8๏ฐ ๏ Z๏ข = ๏ง ๏ท๏ง ๏ท = ๏ง −1 ๏จ I L ๏ธ ๏จ 9 ๏ธ ๏ง 1.4๏ − cos 0.9 ๏ท 9 ๏ง ๏ท ๏จ ๏ธ 306 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Z ๏ข exceeds the zone 3 setting of (1.3 + j13.33) = 13.399 ๏84.3๏ฐ ๏ for B12. Hence, the impedance during emergency loading lies outside the trip region of this 3-zone mho relay (see Figure 11.29 (b)). 11.21 (a) For the bolted three-phase fault at bus 4, the apparent primary impedance seen by the B12 relay is: Z apparent = V1 V1 − V2 + V2 (V1 − V2 ) V2 = = + I12 I12 I12 I12 Z12 Z apparent = Z12 + V2 I12 Using V2 = Z 24 I 24 and I 24 = I12 + I 32 : Z apparent = Z12 + Z 24 ( I12 + I 32 ) I12 ๏ฆI ๏ถ = Z12 + Z 24 + ๏ง 32 ๏ท Z 24 which is the desired result. ๏จ I12 ๏ธ (b) The apparent secondary impedance seen by the B12 relay. For the bolted three-phase fault at bus 4 is: ๏ข Z apparent = Z apparent ( nV / nI ) ๏ฆI ๏ถ ๏จ I12 ๏ธ ( 3 + j 40 ) + ( 6 + j80 ) + ๏ง 32 ๏ท ( 6 + j80 ) = ( nV / nI ) ๏ฉ ๏ฉ ๏ฆ I 32 ๏ถ ๏น ๏ฆ I 32 ๏ถ ๏น ๏ช9 + 6 ๏ง ๏ท ๏บ + j ๏ช120. + 80 ๏ง ๏ท๏บ ๏จ I12 ๏ธ ๏ป ๏จ I12 ๏ธ ๏ป ๏ซ ๏ข Z apparent =๏ซ ๏ ( nV / nI ) where nV is the VT ratio and nI is the CT ratio. Also, the B12 zone 3 relay is set with a secondary impedance: Zr 3 = ( 3 + j 40 ) + 1.2 ( 6 + j80 ) = 10.2 + j136 ๏ secondary ( nV / nI ) ( nV / nI ) 307 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ข ๏ข ๏ข Comparing Z r 3 with Z apparent , Z apparent exceeds Z r 3 when ( I 32 / I12 ) ๏พ 0.2 . Hence Z apparent lies outside the trip region for the three-phase fault at bus 4 when ( I 32 / I12 ) ๏พ 0.2 ; remote backup of line 2–4 at B12 is then ineffective. (1) 2 2 11.22 Rr = ( 22 + 0.82 ) (1) 0.8 2 = 0.431 p.u.; Xr = ( 22 + 0.82 ) = 0.1724 p.u. The X–R diagram is given below: Based on the diagram, Z S can be obtained analytically or graphically: Z S = Z L + Z r = ( 0.1 + 0.431) + j ( 0.3 + 0.1724 ) = 0.7107๏41.66๏ฐ ๏ฆ 0.1724 ๏ถ ๏ท ๏จ 0.431 ๏ธ ๏ค = ๏ฑ S − ๏ฑr = 41.66๏ฐ − tan −1 ๏ง = 41.66๏ฐ − 22๏ฐ = 19.66๏ฐ 11.23 (a) Given the reaches, Zone 1: Z r = 0.1 ๏ด 80% = 0.08; Zone 2: 0.1 ๏ด 120% = 0.12; Zone 3: 0.1 ๏ด 230% = 0.25 In the view of the system symmetry, all six sets of relays have identical settings. (b) It should be given in the problem statement that the system is the same as Problem 9.11. VLN base = 230 3 = 133 kV; I L base = 100 0.23 3 = 251 A 308 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. The equivalent instrument transformer’s secondary quantities are ๏ฆ 115 ๏ถ ๏ฆ 5 ๏ถ Vbase = 133 ๏ง = 115V; I base = 251๏ง ๏ท ๏ท = 3.14 A ๏จ 133 ๏ธ ๏จ 400 ๏ธ ๏ Z base = 115 / 3.14 = 36.7 ๏ ๏The settings are (by multiplying by 36.7) Zone 1: 2.93 ๏; Zone 2: 4.40 ๏; Zone 3: 9.16 ๏ (c) The operating region for three zone distance relay with directional restraint as per the arrangement of Fig. 11.50 is shown below: Locate Point X on the diagram. Comment on line breaker operations: B31: Fault in Zone 1; instantaneous operation B32: Directional unit should block operation B23: Fault in Zone 2; delayed operation B31 should trip first, preventing B23 from tripping. B21: Fault duty is light. Fault in Zone 3, if detected at all. B12: Directional unit should block operation. B13: Fault in Zone 2; just outside of Zone 1; delayed operation Line breakers B13 and B31 clear the fault as desired. In addition, breakers B1 and B4 must be coordinated with B13 so that the trip sequence is B13, B1, and B4 from fastest to slowest. Likewise, B13, B31, and B23 should be faster than B2 and B5. 11.24 For a 20% mismatch between I1๏ข and I 2๏ข , select a 1.20 upper slope in Figure 11.34. That is: 2+k = 1.20 2−k Solving, k = 0.1818 309 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 11.25 (a) Output voltages are given by V1 = jX m I1 = j 5 ( − j16 ) = 80 V V2 = jX m I 2 = j 5 ( − j 7 ) = 35 V V3 = jX m I 3 = j 5 ( j 36 ) = −180 V V4 = jX m I 4 = j 5 ( − j13) = 65 V ๏V0 = V1 + V2 + V3 + V4 = 80 + 35 − 180 + 65 = 0 Thus there is no voltage to operate the voltage relay VR. For the external fault on line 3, voltages and currents are shown below: (b) Moving the fault location to the bus, as shown below, the fault currents and corresponding voltages are indicated. Now V0 = 80 + 35 + 50 + 65 = 230 V and the voltage relay VR will trip all four line breakers to clear the fault. 310 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (c) By moving the external fault from line 3 to a corresponding point (i) On Line 2 Here V0 = 80 − 195 + 50 + 65 = 0 VR would not operate. (ii) On Line 4 This case is displayed below: Here V0 = 80 + 35 + 50 − 165 = 0 VR would not operate. 11.26 First select CT ratios. The transformer rated primary (20 kV side) current is: I1 rated = 5 ๏ด 106 = 250 A 20 ๏ด 103 From Table 11.2, select a 300 : 5 CT ratio on the 20 kV (primary) side to give I1๏ข = ( 250 )( 5 / 300 ) = 4.167 A at rated conditions. Similarly: I 2 rated = 5 ๏ด 106 = 577.4 A 8.66 ๏ด 103 Select a 600 : 5 secondary CT ratio so that I 2๏ข = ( 577.4 )( 5 / 600 ) = 4.811 A at rated conditions. 311 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Next, select relay taps to balance currents in the restraining windings. The ratio of currents in the restraining windings is: I 2๏ข 4.811 = = 1.155 I1๏ข 4.167 The closest relay tap ratio is T2๏ข / T1๏ข = 1.10 . The percentage mismatch for this tap setting is: ๏ฆ 4.167 ๏ถ ๏ฆ 4.811 ๏ถ − ๏ข ๏ข ๏ข ๏ข I / T − I / T ( ) ( 2 2 ) ๏ด 100 = ๏ง๏จ 5 ๏ท๏ธ ๏ง๏จ 5.5 ๏ท๏ธ ๏ด 100 %Mismatch = 1 1 ๏ฆ 4.811 ๏ถ ( I2๏ข / T2๏ข ) ๏ง 5 ๏ท ๏จ ๏ธ = 4.7% 11.27 Connect CTs in ๏ on the 500 kV Y side, and in Y on the 345 kV ๏ side of the transformer. Rated current on the 345 kV ๏ side is I a rated = 500. ๏ด 106 345. ๏ด 103 3 = 836.7 A Select a 900 : 5 CT ratio on the 345 kV ๏ side to give Ia๏ข = ( 836.7 )( 5 / 900 ) = 4.649 A at rated conditions in the CT secondaries and in the restraining windings. Similarly, rated current on the 500 kV Y side is I A rated = 500 ๏ด 106 500 ๏ด 103 3 = 577.4 A Select a 600 : 5 CT ratio on the 500 kV Y side to give I A๏ข = ( 577.4 )( 5 / 600 ) = 4.811 A in the 500 ๏ข = 4.811 3 = 8.333 A in the restraining windings. kV CT secondaries and I AB Next, select relay taps to balance currents in the restraining windings. ๏ข I AB 8.333 = = 1.79 I a๏ข 4.649 ๏ข Ta๏ข = 1.8 The closest tap ratio is TAB For a tap setting of 5 : 9 . The percentage mismatch for this relay tap setting is: %Mismatch = ( I ๏ขAB / TAB๏ข ) − ( Ia๏ข / Ta๏ข ) ๏ด 100 = (8.333 / 9 ) − ( 4.649 / 5) ๏ด 100 ( Ia๏ข / Ta๏ข ) ( 4.649 / 5) = 0.4% 312 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 11.28 The primary line current is 15 ๏ด 106 3 ( 33 ๏ด 103 ) = 262.43 A (say I p ) The secondary line current is 262.43 ๏ด 3 = 787.3 A (say I r ) ๏ฆ 5 ๏ถ The CT current on the primary side is ip = 262.43 ๏ง ๏ท = 4.37 A ๏จ 300 ๏ธ ๏ฆ 5 ๏ถ The CT current on the secondary side is is = 787.3 ๏ง ๏ท 3 = 3.41 A ๏จ 2000 ๏ธ [Note: 3 is applied to get the value on the line side of ๏-connected CTs.] The relay current under normal load is ir = i p − is = 4.37 − 3.41 = 0.96 A With 1.25 overload ratio, the relay setting should be ir = 1.25 ( 0.96 ) = 1.2 A 11.29 The primary line current is I p = 30 ๏ด 106 3 ( 33 ๏ด 103 ) = 524.88 A Secondary line current is I s = 3I p = 1574.64 A ๏ฆ 5 ๏ถ The CT current on the primary side is I1 = 524.88 ๏ง ๏ท = 5.25 A ๏จ 500 ๏ธ ๏ฆ 5 ๏ถ And that on the secondary side is I 2 = 1574.64 ๏ง ๏ท 3 = 6.82 A ๏จ 2000 ๏ธ Relay current at 200% of the rated current is then 2 ( I 2 − I1 ) = 2 ( 6.82 − 5.25 ) = 3.14 A 11.30 Line currents are: I ๏ = 10 ๏ด 106 3 ( 33 ๏ด 103 ) IY = = 174.95 A 10 ๏ด 106 3 (11 ๏ด 103 ) = 524.86 A If the CT’s on HV-side are connected in Y, then the CT ratio on the HV-side is 524.86 / 5 = 104.97 ( ) Similarly, the CT ratio on the LV-side is 174.95 5 / 3 = 505.04 313 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Chapter 12 Transient Stability 12.1 (a) ๏ทsyn = 2๏ฐ 60 = 377 rad/s 2 p ๏ทmsyn = ๏ทsyn = 2 (377) = 188.5rad/s 4 (b) KE=H Srated=4(500×106) =2×109 joules (c) Using (12.1.16) ๐ผ= ๐๐๐.๐ข. ๐๐ ๐ฆ๐ 2๐ป๐๐๐ข 2 ๐ผ๐ = ๐ ๐ผ = 2H ๏ทsyn ๏ท pu (t ) ๏ต (t ) = Pa p.u. (t ) 500 2๐60 500 = (2)(4)(1) = 47.1 ๐๐๐/๐ 2 2 (47.1) = 23.55 ๐๐๐/๐ 2 4 12.2 Using (12.1.17) ๐ฝ= 2๐ป ๐๐๐๐ก๐๐ (2)(4)(500×106 ) = = 1.1258 × 105 ๐๐๐2 ๐2 ๐๐ ๐ฆ๐ (188.5)2 12.3 (a) The kinetic energy in ft-lb is: KE = 1 ๏ฆ WR 2 ๏ถ 2 ๏ท m ft- lb 2 ๏ง๏จ 32.2 ๏ท๏ธ ๏ฆ 2๏ฐ ๏ถ (b) Using ๏ทm = ๏ง ๏ท ( rpm ) ๏จ 60 ๏ธ 1 ๏ฆ WR 2 ๏ถ ๏ฉ 2๏ฐ ๏น KE = ๏ง (rpm)๏บ ๏ท ๏ช 2 ๏จ 32.2 ๏ธ ๏ซ 60 ๏ป 2 ft- lb ๏ด 1.356 joules ft- lb KE = 2.31 ๏ด 10−4 (WR2 ) (rpm)2 joules (c) Then from (12.1.7): ( 2.31 ๏ด 10−4 )(WR2 ) ( rpm ) per unit-seconds H= 2 Srated ( 2.31๏ด 10−4 )( 4 ๏ด 106 ) ( 3600 ) = 15.97 per unit − seconds H= 2 750 ๏ด 106 12.4 Per unit swing equations 2H ๏ท pu (t ) d 2๏ค (t ) = Pmpu (t ) − Pepu (t ) = Papu (t ) ๏ทsyn dt 2 314 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Assuming ๏ท pu (t ) ๏ป 1 → 2 H d 2๏ค ( t ) = Papu (t ) wsyn dt 2 2(4) ๐ 2 ๐ฟ(๐ก) = 0.7 ∗ (0.4)(0.7) = 0.42 (i.e. a 60% reduction to 0.4) 2๐60 ๐๐ก 2 Initial Conditions: δ(0) = 12° = 0.2094 ๐๐๐; ๐๐ฟ(0) =0 ๐๐ก Integrating twice and using the above initial conditions: ๐๐ฟ(๐ก) = 19.78๐ก + 0 ๐๐ก ๐ฟ(๐ก) = 9.89๐ก 2 + 0.2094 At t=5 cycles=0.08333 seconds ๐ฟ(5 ๐๐ฆ๐๐๐๐ ) = 9.89(0.08333)2 + 0.2094 ๐ฟ(5 ๐๐ฆ๐๐๐๐ ) = 0.2781 ๐๐๐ = 15.93° 12.5 H= 1 J 2 ๏ทm2 syn Srated ; ๏ทmsyn = 2 (2๏ฐ f ) p 562 ๐ป56 = ๐ป60 602 315 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 12.6 (a)๐๐ ๐ฆ๐ = 2 โ ๐ โ 60 = 377 ๐๐๐/๐ 2 2 ๐๐๐ ๐ฆ๐ = ๐ ๐๐ ๐ฆ๐ = 16 377 = 47.125 ๐๐๐/๐ (b) H=1.5 p.u. -s; KE=H Srated=1.5(500×106) =7.5×108 joules (c) δ(0) = 10° = 0.1745 ๐๐๐; ๐๐ฟ(0) =0 ๐๐ก 2(1.5) ๐2 ๐ฟ(๐ก) = 0.5 ๐๐๐ ๐ก ≥ 0 2๐60 ๐๐ก 2 ๐๐ฟ(๐ก) 2๐60 =( )๐ก + 0 ๐๐ก 6 2๐60 2 ๐ฟ(๐ก) = ( ) ๐ก + 0.1745 12 At t=5 cycles=0.08333 seconds ๐ฟ(5 ๐๐ฆ๐๐๐๐ ) = 31.4(0.08333)2 + 0.2094 = 0.1274 ๐๐๐ = 7.3° 12.7 K๐ธ๐๐๐ = ๐ป๐๐๐๐ก๐๐ = (4)(100 × 106 ) = 4 × 108 ๐๐๐ข๐๐๐ 1 For a moving mass ๐๐๐๐๐๐ก๐๐ = 2 ๐๐ 2 To equal the energy stored in the generator K๐ธ๐๐๐ = ๐๐๐๐๐๐ก๐๐ 2(K๐ธ๐๐๐ ) ๐=√ ๐ 2(4×108 ๐๐๐ข๐๐๐ ) ๐ ๐๐๐๐๐ = 81.6 ๐ = 182.53 โ๐๐ข๐ 120,000๐๐ ๐=√ 12.8 (a) P = Vt Vbus X sin ๏ค t ๏ sin ๏ค t = ( 0.8 )( 0.22 ) = 0.167619 ( P )( X ) = (Vt )(Vbus ) (1.05)(1.0 ) ๏ค t = sin −1 ( 0.167619 ) = 9.65๏ฐ Vt − Vbus 1.05 ๏9.65๏ฐ − 1.0 ๏0๏ฐ = jX j 0.22 0.03514 + j 0.1760 I = = 0.81579๏ − 11.291๏ฐ j 0.22 I = S = Vt I * = (1.05 ๏9.65๏ฐ )( 0.81579 ๏11.291๏ฐ ) = 0.85658๏20.941๏ฐ S = 0.80 + j 0.306 Q = Im S = 0.306 per unit 316 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (b) E ๏ข = Vbus + j ( X d๏ข + X ) I = 1.0๏0๏ฐ + j ( 0.3 + 0.22 )( 0.81579๏ − 11.291๏ฐ ) E ๏ข = 1.0 ๏0๏ฐ + 0.4242๏78.709๏ฐ E ๏ข = 1.160๏21.01๏ฐ per unit (c) P= (1.160 )(1.0 ) sin ๏ค E ๏ข Vbus sin ๏ค = ( X d๏ข + X ) 0.3 + 0.22 P = 2.231sin ๏ค per unit 12.9 Circuit during the fault at bus 3: where E๏ข = 1.160๏๏ค is determined in Problem 12.8. The Thévenin equivalent, as viewed from the generator internal voltage source, shown here, is the same as in Figure 12.9 P= (1.160 )( 0.333) sin ๏ค = 0.8279sin ๏ค per unit E ๏ข VTh sin ๏ค = xTh 0.4666 12.10 (X42 + X25 )๏น๏ป + X15 = 0.01 + ๏ฉ๏ซ0.025 (0.01 + 0.05)๏น๏ป + 0.02 XTh = X34 + ๏ฉ๏ซX 45 = 0.0514 ๏ 317 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 12.11 (X42 + X25 )๏น๏ป = 0.01 + ๏ฉ๏ซ0.025 (0.05 + 0.10)๏น๏ป XTh = X34 + ๏ฉ๏ซX 45 = 0.03143 ๏ 12.12 P= (1.2812 )(1.0 ) sin ๏ค = 1.8303sin ๏ค E ๏ข VBUS sin ๏ค = Xeq 0.70 ๏ฆ 1 ๏ถ ๏ท = 0.4179 rad ๏จ 2.4638 ๏ธ ๏ฆ 1 ๏ถ ๏ค1 = sin −1 ๏ง ๏ท = 0.5780 rad ๏จ 1.8303 ๏ธ ๏ค 0 = sin −1 ๏ง A1 = ๏ฒ ๏ค1 = 0.5780 ๏ค 0 = 0.4179 ๏ค2 (1.0 − 1.8303 sin ๏ค ) d๏ค = ๏ฒ๏ค =0.5780 (1.8303sin ๏ค − 1) d๏ค = A2 1 ( 0.5780 − 0.4179 ) + 1.8303 ( cos0.5780 − cos0.4179 ) = 1.8303 ( cos.5780 − cos ๏ค 2 ) − (๏ค 2 − 0.5780 ) 1.8303cos ๏ค 2 + ๏ค 2 = 2.0907 Solving iteratively (Newton-Raphson) ๏ค 2 = 0.7439 rad = 42.62๏ฐ 318 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 12.13 ๏ค 0 = 0.4179 rad ๏ค1 = 0.4964 rad (From Example 11.4) A1 = ๏ฒ ๏ค1 = 0.4964 ๏ค 0 = 0.4179 1.0d๏ค = ๏ฒ ๏ค2 ๏ค1 = 0.4964 ( 2.1353sin ๏ค − 1.0 ) d๏ค ( 0.4964 − 0.4179) = 2.1353 ( cos0.4964 − cos ๏ค 2 ) − (๏ค 2 − 0.4964) 2.1353cos ๏ค 2 + ๏ค 2 = 2.2955 Solving iteratively using Newton Raphson with ๏ค 2 (0) = 0.60 rad ๏ค 2 ( i + 1) = ๏ค 2 (i) + ๏ −2.1353sin ๏ค 2 (i) + 1๏ −1 ๏2.2955 − 2.1353cos ๏ค 2 (i) − ๏ค 2 (i)๏ i 0 1 2 3 4 ๏ค2 0.60 0.925 0.804 0.785 0.7850 ๏ค 2 = 0.7850 rad = 44.98๏ฐ 12.14 Referring to Figure 12.8, the critical clearing time occurs when the accelerating area, A1 , is equal to the decelerating area, A3, in which the maximum value of d is determined from the post-fault curve. 1 − 2.1353sin ๏ค max = 0 → ๏ค max = 2.654rad = 152.1๏ฐ To determine the clearing time, first solve for the critical clearing angle. The post fault curve is the same as in Problem 12.13, so we have A1 = ๏ฒ ๏ค cr ๏ค 0 = 0.4179 1.0d๏ค = ๏ฒ ๏ค max = 2.654 ๏ค cr ( 2.1353sin ๏ค − 1.0 ) d๏ค (๏ค cr − 0.4179 ) = 2.1353 ( cos ๏ค cr − cos (2.654) ) − ( 2.654 − ๏ค cr ) 0.3496 = 2.1353cos ๏ค cr → ๏ค cr = 1.4063rad = 80.58๏ฐ Then we can solve for tcr as in Example 12.5 tcr = 4H (1.4063 − 0.4179 ) = 0.1774 sec = 10.6 cycles (2๏ฐ 60)(1.0) 319 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 12.15 If gen 3 X d๏ข = 0.24 on an 800 MVA base, then it is 0.03 on a 100 MVA base. (a) Xeq = 0.02 + ๏0.025 0.15๏ + 0.04 = 0.0814 * ๏ฆ 3.00 ๏ถ I =๏ง ๏ท = 3 ๏ 0 E ๏ข = 1.0 + j 0.0814.3 ๏ 0 ๏จ 1๏ 0 ๏ธ E ๏ข = 1 + j 0.2442 = 1.0294๏13.7 ๏ฐ (b) The faulted network is ๏ป Xeq = 0.03 + 0.01 + 0.1 ๏ฉ๏ซ0.025 + (0.02 0.05)๏น๏ป = 0.0682 Veq = 1๏0 ๏ ๏ฝ 0.0357 0.1 ๏ = 0.5130๏0 0.0557 0.125 1.0294 ๏ 0.513 sin ๏ค 0.0682 = 7.742sin ๏ค Pe2 = Once the fault is cleared, the network becomes 1.0294 ๏ 1 sin ๏ค 0.085 = 12.11sin ๏ค Pe3 = 320 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ค 0 = 13.7 = 0.239rad ๏ฆ 4 ๏ถ d 2๏ค (t ) ๏ง 2๏ฐ 60 ๏ท dt 2 = pmp.u. − pep.u. = 1 − 12.11sin ๏ค (t ) ๏จ ๏ธ ๏ฆ 4 ๏ถ d ๏ค (t ) ๏ง 2๏ฐ 60 ๏ท dt = t + 12.11cos ๏ค (t ) + 0 ๏จ ๏ธ 1 2 ๏ฆ 4 ๏ถ ๏ง 2๏ฐ 60 ๏ท ๏ค (t ) = 2 t + 12.11sin ๏ค (t ) + 0.239 ๏จ ๏ธ 4 1 ๏ฆ ๏ถ 2 ๏ง 2๏ฐ 60 ๏ท ๏ค (0.05) = 2 (0.05) + 12.11sin ๏ค (0.05) + 0.239 ๏จ ๏ธ 0.011 ๏ ๏ค (0. 05) = 0.0013 + 12.11sin ๏ค (0.05) + 0.239 0.011 ๏ ๏ค (0.05) = 0.2402 + 12.11sin ๏ค (0.05) Solving iteratively, the power angle when the fault is cleared is: 0.011 ๏ ๏ค (0.05) = 0.2402 + 12.11sin ๏ค (0.05) ๏ค (0.05) == 0.020rad = −1.15 (c) Using the equal area criteria, we can solve for the maximum value of the power angle. ๏ฆ 2 H ๏ถ d 2๏ค (t ) ๏ง 2๏ฐ 60 ๏ท dt 2 = pmp.u. ๏จ ๏ธ ๏ค (0) = ๏ค 0 = 0.239rad d ๏ค (0) =0 dt ๏ฆ d ๏ค (t ) ๏ถ 2๏ฐ 60 ๏ pmp.u. ๏ t +0 ๏ง dt ๏ท = 2H ๏จ ๏ธ 2๏ฐ 60 ๏ pmp.u. ๏ t 2 + ๏ค0 4H 2๏ฐ 60 ๏ค1 = (0.05) 2 + 0.239 = 0.3175 12 A1 = ๏ฒ๏ค๏ค10 pmp.u.d ๏ค = ๏ฒ๏ค๏ค10 1d ๏ค = 0.3175 − 0.239 = 0.0785 ๏ค (t ) = 2 A2 = ๏ฒ๏ค๏ค12 pmax sin ๏ค − pmp.u.d ๏ค = ๏ฒ๏ค0.3175 12.11sin ๏ค − 1d ๏ค = A1 = 0.0785 12.11๏ซ๏ฉcos(0.3175) − cos ๏ค 2 ๏ป๏น − (๏ค 2 − 0.3175) = 0.0785 12.11cos ๏ค 2 + ๏ค 2 = 11.744 Solving iteratively, the maximum power angle is: ๏ค 2 = − 0.177 rad = − 10.148 321 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 12.16 The system has no critical clearing angle because ๏ฐ ๏ฒ P − P sin ๏ค = Accelerating area m e2 ๏ค0 ๏ค 0 = 13.7 ๏ฐ = 0.239 rad =3 (๏ฐ − 0.239) − Pe2 cos ๏ค ๏ฐ 0.239 with Pe2 = 7.742 → 3 (2.9026) + 7.742 ๏ (−1 − 0.971) = −6.551 is less than zero 12.17 dx = − x, dt x (0) = 10, ๏ t = 0.1 (a) x (t + ๏ t) = x(t ) + dx(t ) ๏t dt x (0.1) = 10 + (− 10)(0.1) = 9 x (0.2) = 9 + (− 9)(0.1) = 8.1 x (0.3) = 8.1 + (− 8.1)(0.1) = 7.29 x (0.4) = 7.29 + (− 7.29)(0.1) = 6.561 x (0.5) = 6.561 + (− 6.561)(0.1) = 5.9049 (b) x(0) = x(0) + dx(0) ๏ t = 10 + (− 10)(0.1) = 9 dt dx(0) = −9 dt ( ) ๏ฆ dx (t ) + dx ( t ) ๏ถ dt dt ๏ท x ( t + ๏ t ) = x (t ) + ๏ง ๏t ๏ง ๏ท 2 ๏จ ๏ธ (−10 + (− 9)) 0.1 = 9.05 x(0.1) = 10 + ( ) 2 t 0 0.1 0.2 0.3 0.4 0.5 x 9 8.145 7.371225 6.670959 6.037218 5.463682 x 10 9.05 8.19025 7.412176 6.7080195 6.0707577 322 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 12.18 dx1 = x2 dt dx2 = − x1 dt x1 (0) = 1.0 ๏ t = 0.1 x2 (0) = 0 dx1 (0) ๏ t = 1.0 + 0 (0.1) = 1.0 dt dx (0) x2 (0.1) = x2 (0) + 2 ๏ t = 0 − 1.0 (0.1) = − 0.1 dt x1 (0.2) = 1 + (− 0.1)(0.1) = 0.99 (a) x1 (0.1) = x1 (0) + x2 (0.2) = (− 0.1) + (− 1) (0.1) = −0.2 x1 (0.3) = 0.99 + (−0.2) (0.1) = 0.97 x2 (0.3) = − 0.2 + (− 0.99)(0.1) = −0.299 ¿ 0 1 2 3 x1 1.0 1.0 0.99 0.97 x2 0 − 0.1 − 0.2 − 0.299 ๏ฆ dx ๏ถ (b) x1 = x1 + ๏ง 1 ๏ท ๏ t ๏จ dt ๏ธ ๏ฆ dx ๏ถ x2 = x2 + ๏ง 2 ๏ท ๏ t ๏จ dt ๏ธ dx1 = x2 dt dx2 = − x1 dt ๏ฆ dx1 (t ) + dx1 (t ) ๏ถ dt ๏ท ๏t x1 (t + ๏t) = x1 (t ) + ๏ง dt ๏ง ๏ท 2 ๏จ ๏ธ ๏ฆ dx2 (t ) + dx2 (1) ๏ถ dt ๏ท ๏t x2 (t + ๏ t) = x2 (t ) + ๏ง dt ๏ง ๏ท 2 ๏จ ๏ธ x1 (0) = 1.0 + (0) (0.1) = 1.0 x2 (0) = 0 + (− 1.0)(0.1) = − 0.1 ๏ฆ dx1 (0) + dx1 (0) ๏ถ dt ๏ท ๏t x1 (0.1) = x1 (0) + ๏ง dt ๏ง ๏ท 2 ๏จ ๏ธ ๏ฆ 0 + (− 0.1) ๏ถ = 1.0 + ๏ง ๏ท (0.1) = 0.995 2 ๏จ ๏ธ ๏ฆ − 1.0 + (− 1.0) ๏ถ x2 (0.1) = 0 + ๏ง ๏ท (0.1) = − 0.1 2 ๏จ ๏ธ dx1 (0) = − 0.1 dt dx2 (0) = − 1.0 dt 323 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. t 0 0.1 0.2 0.3 x1 1 0.994 0.978428 0.956936 x2 −0.1 −0.1995 −0.25773 −0.31753 x1 1 0.995 0.980025 0.95915 x2 0 − 0.1 −0.159725 −0.22161 12.19 ๐ป = 20 ๐ ๐๐ ๐. ๐ข. ๐ท = 0.1 ๐. ๐ข. 100 MVA base (a) ๐๐๐ = 0.0375 + (0.08||0.08) = 0.0775 500 (100) ๐ −1 ๐ผ= ∠ −cos (๐๐) = ∠0° = 5.0∠0° ๐๐๐ข๐ (๐๐) (1.0)(1.0) ฬ ฬ ฬ ๐ธ ′ = ๐ธ ′ ∠δ = V๐๐ข๐ + ๐๐๐๐ ๐ผ = 1.0∠0° + j0.0775(5.0∠0°) = 1 + j0.388 = 1.0726∠21.2063° (b) ๐๐๐๐ ๐๐ ๐๐๐๐ฃ๐๐๐ข๐ (c) From the fifth line ๐ฟ0 = ∠21.2063° = 0.3701 rad from (a) ๐ฟ0.01667 = 0.3701 + (377 − 377)(0.01667) = 0.3701 377 − 0.1(0) ๐0.01667 = 377 + (0.01667) [ ] = 377.15711 2(20)(1) ๐ฟ0.0333 = 0.3701 + (0.01667)(377.15711 − 377) = 0.3727 rad 377 − 0.1(0.15711) ๐0.0333 = 377.15711 + 0.01667 [ ] = 377.3142 ๐๐๐ 2(20)(1) 324 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 12.20 The critical clearing time for a sold fault midway between buses 1 and 2 is about 0.07 seconds. Below are plots of the generator rotor angle with the fault cleared at 0.07 seconds and 0.08 seconds, respectively. 12.21 The critical clearing time for a sold fault midway between buses 1 and 2 is about 0.37 seconds. Below are plots of the generator rotor angle with the fault cleared at 0.37 seconds and 0.38 seconds, respectively. 12.22 (a) By inspection: 0 0 0๏น ๏ฉ −30 20 10 ๏ช 20 −30 0 10 0 0 ๏บ๏บ ๏ช ๏ช 10 0 −50 0 40 0๏บ Ybus = j ๏ช ๏บ 0 −50 40 0๏บ ๏ช 0 10 ๏ช 0 0 40 40 −100 20 ๏บ ๏ช ๏บ 0 0 0 20 −20 ๏บ๏ป ๏ช๏ซ 0 ๏ฉ 1 ๏ช ๏ข ๏ช jX d1 ๏ช (b) Y22 = ๏ช 0 ๏ช ๏ช ๏ช 0 ๏ช๏ซ 0 1 jX d๏ข 2 0 ๏น 0 ๏บ ๏บ − j5 0 0 ๏น ๏บ ๏ฉ ๏ช 0 ๏บ = ๏ช 0 − j10 0 ๏บ๏บ p.u. ๏บ ๏ช๏ซ 0 0 − j10 ๏บ๏ป 1 ๏บ๏บ jX d๏ข3 ๏บ๏ป 325 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฉ −1 ๏ช jX ๏ข ๏ช d1 ๏ช ๏ช 0 ๏ช Y12 = ๏ช 0 ๏ช ๏ช 0 ๏ช ๏ช 0 ๏ช ๏ช 0 ๏ซ๏ช 0 −1 jX d๏ข2 0 0 0 0 ๏น 0 ๏บ ๏บ ๏บ ๏ฉ j 5.0 0 ๏บ ๏ช 0 ๏บ ๏ช ๏ช 0 0 ๏บ๏บ = ๏ช 0 0 ๏บ ๏ช๏ช 0 ๏บ 0 ๏บ ๏ช ๏ช๏ซ 0 −1 ๏บ ๏บ jX d๏ข3 ๏ป๏บ 0 j10 0 0 0 0 0 ๏น 3.0 − j 2.0 Yload3 = = 3 − j2 0 ๏บ๏บ 12 0 ๏บ 2 − j 0.9 = 2 − j 0.9 ๏บ p.u. Yload4 = 12 0 ๏บ Yload5 = 1 − j 0.3 0 ๏บ ๏บ j10 ๏บ๏ป j 20 j10 0 0 0๏น ๏ฉ− j 35 ๏ช ๏บ 0 j10 0 0๏บ ๏ช j 20 − j 40 ๏ช j10 0 (3 − j 2) 0 j 40 0๏บ Y11 = ๏ช ๏บ j10 0 (2 − j 50.9) j 40 0๏บ ๏ช 0 ๏ช 0 0 j 40 j 40 (1 − j100.3) j 20๏บ ๏ช ๏บ 0 0 0 j 20 − j30๏ป๏บ ๏ซ๏ช 0 12.23 (a) By inspection with line 4-5 open: −30 20 10 0 0 0 20 −30 0 10 0 0 10 0 −50 0 40 0 ๐๐๐ข๐ = 0 10 0 −10 0 0 0 0 40 0 −60 20 [ 0 0 0 0 20 −20] ๐๐๐๐๐3 = 3.0−๐2.0 = 3.0 − ๐2.0 ๐. ๐ข. (1.0)2 ๐๐๐๐๐4 = 2.0−๐0.9 = 2.0 − ๐0.9 ๐. ๐ข. (1.0)2 ๐๐๐๐๐5 = 1.0−๐0.3 = 1.0 − ๐0.3 ๐. ๐ข. (1.0)2 326 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. −๐35 ๐20 ๐10 0 0 0 ๐20 −๐40 0 ๐10 0 0 ๐10 0 3 − ๐52 0 ๐40 0 ๐11 = 0 ๐10 0 2 − ๐10.9 0 0 0 0 ๐40 0 1 − ๐60.3 ๐20 0 0 0 ๐20 −๐30] [ 0 1 ๐๐′๐1 0 0 0 1 ๐๐′๐2 0 0 0 1 ๐๐′๐3 ] ๐22 = [ ๐5 0 0 ๐10 0 0 ๐12 = 0 0 0 0 0 [0 −๐5 0 0 −๐10 0 ] ๐๐๐ ๐ข๐๐๐ก =[ 0 0 0 −๐10 0 0 0 ๐๐๐ ๐ข๐๐๐ก 0 0 ๐10] (b) Y12 and Y22 are the same as Problem 12.22/12.23 (a). −๐35 ๐20 ๐10 0 0 0 ๐20 −๐40 0 ๐10 0 0 ๐10 0 3 − ๐52 0 ๐40 0 ๐11 = ๐๐๐ ๐ข๐๐๐ก 0 ๐10 0 −๐50 ๐40 0 0 0 ๐40 ๐40 1 − ๐100.3 ๐20 0 0 0 ๐20 −๐30] [ 0 12.24 The critical clearing time for a sold fault occurring on Line 1 close to Bus 2 is about 0.17 seconds. Below are plots of the generator rotor angle with the fault cleared at 0.17 seconds and 0.18 seconds, respectively. 327 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 12.25 The critical clearing time for a fault on the line between buses 44 and 14 for the Example 12.9 case with the fault occurring near bus 14 is about 0.584 seconds. Below is a plot of the generator angles with this clearing time. 12.26 The critical clearing time is 0.68 seconds using a time step of 0.01 seconds for the simulation. Note that the system is stable if the fault is cleared after 0.9 seconds, 1.0 seconds, etc. Part of this is due to this case not having exciter models. Below are plots of the generator rotor angle with the fault cleared at 0.68 seconds and 0.69 seconds, respectively. 328 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (a)๐ผ = 12.27 0.8 (1.0)(1.0) ๏0๏ฐ = 0.8๏0๏ฐ ๐๐ = 1.0๏0๏ฐ + j0.22(0.8๏0๏ฐ) = 1 + j0.176 = 1.02 ∠ 9.98๏ฐ ๐ธฬ = 1.0239∠12.407๏ฐ + j(2.0)(0.8๏0๏ฐ) = 1 + j1.82 = 2.0766 ∠ 61.2134๏ฐ then δ = 61.2134๏ฐ ๐๐ 0.8764 [๐ ] = [ 0.4815 ๐ 0.7917 −0.4815 1.0 ][ ]=[ ] 0.6357 0.8764 0.176 ๐ผ๐ 0.8764 [๐ผ ] = [ 0.4815 ๐ 0.7011 −0.4815 0.8 ][ ] = [ ] 0 0.3852 0.8764 ๐ธ๐ ′ = ๐๐ + ๐ ๐ ๐ผ๐ + ๐๐ ๐ผ๐ = 0.6357 + (0)(0.3852) + (0.3)(0.7011) = 0.8460 ๐ธ๐ ′ = ๐๐ + ๐ ๐ ๐ผ๐ − ๐๐ ๐ผ๐ = 0.7917 + 0 − (0.5)(0.3852) = 0.5991 ๐๐ธ๐ ๐ธ๐๐ = ๐๐ ( ) + (๐๐ − ๐๐′ )๐ผ๐ + ๐ธ๐ ๐๐ก = 0 + (2.1 − 0.3)0.7011 + 0.8460 = 2.1080 (b) The critical clearing time is 0.35 seconds using a time step of 0.01 seconds for the simulation. Below are plots of the generator rotor angle with the fault cleared at 0.35 seconds and 0.36 seconds, respectively. 12.28 (a) X ๏ข = X a + X1 X m (0.17)(3.8) = 0.2297 p.u. = 0.067 + X1 + X m (0.17 + 3.8) X = X a + X m = 3.867 p.u. T0๏ข = I= X1 + X m (0.17 + 3.8) = 0.85 s = ๏ท 0 R1 (2๏ฐ 60)(0.0124) 1.0 ๏ 0๏ฐ = 1 ๏ 0๏ฐ (1.0)(1.0) Vt = 1 ๏ 0 ๏ฐ + ( j 0.22)(16 ๏ฐ) = 1 + j 0.22 Vr = Er๏ข − Ra I r + X ๏ขI i = 0.8475 − (0.013)(0.8433) + (0.2297)(0.7119) = 1.0 329 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Vi = E1๏ข − Ra Ii − X ๏ขIr = 0.4230 − (0.013)(0.7119) + (0.2297)(0.8433) = 0.22 dEr๏ข 1 = (2๏ฐ 60)(− 0.0129)(0.4230) − (0.8475 − (3.867 − 0.2297)(0.7119) = 0 dt 0.85 dEi๏ข 1 = − (2๏ฐ 60)(− 0.0129)(0.8475) − (0.4230 + (3.867 − 0.2297)(0.8433)) = 0 dt 0.85 (b) 1 12.29 pf = = 0.9766 12 + 0.222 P 1.0 I= ๏ − cos−1 ( pf ) = ๏ − cos−1 (0.9766) Vbus ( pf ) (1.0)(0.9766) VT = 1.0 + ( j 0.22)(1 − j 0.215) = 1.0473 + j 0.22 = 1.0702๏11.863 ๏ฐ I sore = I − VT (1.0473 + j022) = (1 − j 0.215) + jXeq j 0.8 = 1.275 − j1.524 I p + jI q = (1.275 − j1.524)(1๏ − 11.863 ๏ฐ) = 1.987๏ (− 50.084 − 11.863) = 1.987๏ − 61.947 ๏ฐ = 0.934 − j1.754 Eq = −I q Xeq = (1.754)(0.8) = 1.403 12.32 ๐๐ฟ๐๐๐ = ๐๐ต๐๐ ๐๐ฟ๐๐๐ (๐๐ง |๐ฬ |2 + ๐๐ |๐ฬ | + ๐๐ ) = (100MW)(0.3 × 0.852 + 0.4 × 0.85 + 0.3) = 21.675 + 34 + 30 = 85.675 ๐๐ ๐๐ฟ๐๐๐ = ๐๐ต๐๐ ๐๐ฟ๐๐๐ (๐๐ง |๐ฬ |2 + ๐๐ |๐ฬ | + ๐๐ ) = 50 ๐๐ฃ๐๐(0.5 × 0.852 + 0.4 × 0.85 + 0.1) = 18.0625 + 17 + 5 = 40.0625 ๐๐ฃ๐๐ 330 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 12.33 (a) The input impedance and current are ๐ ๐๐๐ ( 1 + ๐๐1 ) ๐ ๐๐๐ = (๐ ๐ + ๐๐๐ ) + = 0.1278 + ๐0.2338 ๐ 1 + ๐(๐1 + ๐๐ ) ๐ ๐ฬ 1.0๏0๏ฐ ๐ผฬ = = ๐๐๐ ๐๐๐ Then with ๐ = 0.01 we get ๐ผฬ = ๐ฬ 1.0๏0๏ฐ 1.0๏0๏ฐ = = = 1.8 − ๐3.293 ๐๐๐ ๐๐๐ 0.1278 + ๐0.2338 ๐ = 1.8 + ๐3.293 Real power comsuption:1.8×100=180 MW Reactive power consumption: 3.293×100=329.3 Mvar (b) if s=0.02 ๐ ๐๐๐ ( 1 + ๐๐1 ) ๐ ๐๐๐ = (๐ ๐ + ๐๐๐ ) + = 0.064 + ๐0.2304 ๐ 1 + ๐(๐1 + ๐๐ ) ๐ ฬ ๐ 1.0๏0๏ฐ 1.0๏0๏ฐ ๐ผฬ = = = = 1.119 − ๐4.029 ๐๐๐ ๐๐๐ 0.064 + ๐0.2304 ๐ = 1.119 + ๐4.029 Real power comsuption:1.119×100=111.9 MW Reactive power consumption: 4.029×100=402.9 Mvar 12.34 ๐ 0.054138 ๐๐๐ ( 1 + ๐๐1 ) ๐ − 0.9126 ๐ ๐ ๐๐๐ = (๐ ๐ + ๐๐๐ ) + = ๐ 1 0.014 + ๐(๐1 + ๐๐ ) + ๐3.98 ๐ ๐ 0.014 + ๐3.98 ๐ฬ 1.0๏0๏ฐ ๐ ฬ ๐ผ = = = 0.054138 ๐๐๐ ๐๐๐ ๐ − 0.9126 ๐ S = 0.292 331 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 12.35 The fault time duration at which the motor stalls is 0.24 seconds. Below are plots of the bus voltage magnitude and the motor speed with the fault cleared at 0.23 seconds and 0.24 seconds, respectively. If the fault is cleared after 0.23s: If the fault is cleared after 0.24s: 332 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Chapter 13 Power System Controls 13.1 (a) The open-loop transfer function G(S) is given by G (S) = (b) k a ke k f (1 + Ta S )(1 + Te S ) (1 + T f S ) (1 + Ta S )(1 + Te S ) (1 + T f S ) ๏e 1 = = ๏Vref 1 + G ( S ) (1 + Ta S )(1 + Te S ) (1 + T f S ) + ka ke k f For steady state, setting S = 0 ๏eSS = or 1 + k = ( ๏Vref ) SS ( ๏V ) , where k = k k k ref SS a e 1+ k f ๏eSS For the condition stipulated, 1 + k ๏ณ 100 or k ๏ณ 99 ๏ฉ G (S) ๏น (c) ๏Vt ( t ) = ‹ −1 ๏ช ๏Vref ( S ) ๏บ ๏ช๏ซ1 + G ( S ) ๏บ๏ป The response of the system will depend on the characteristic roots of the equation 1 + G (S) = 0 (i) If the roots S1, S2, and S3 are real and distinct, the response will then include the transient components A1eS1t , A2 eS2t , and A3e S3t . (ii) If there are a pair of complex conjugate roots S1, S2 ( = a ๏ฑ j๏ท ) , then the dynamic response will be of the form Ae at sin (๏ท t + ๏ฆ ) . 13.2 (a) The open-loop transfer function of the AVR system is K G (S) H (S) = = KA (1 + 0.1S )(1 + 0.4S )(1 + S )(1 + 0.05S ) 500 K A S + 33.5 S + 307.5 S 2 + 775 S + 500 4 3 333 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. The closed-loop transfer function of the system is Vt ( S ) Vref ( S ) = 25K A ( S + 20 ) S 4 + 33.5 S 3 + 307.5 S 2 + 775 S + 500 + 500 K A (b) The characteristic equation is given by 1 + K G(S ) H (S ) = 1 + 500 K A =0 S + 33.5S + 307.5S 2 + 775S + 500 4 3 Which results in the characteristic Polynomial Equation S 4 + 33.5S 3 + 307.5S 2 + 775S + 500 + 500 K A = 0 The Routh-Hurwitz array for this polynomial is shown below: S4 1 307.5 500 + 500KA S3 33.5 775 0 S2 284.365 500 + 500KA 0 S1 58.9KA − 716.1 0 0 S0 500 + 500KA From the S1 row, it is seen that KA must be less than 13.16 for control system stability; also from the S0 row, KA must be greater than −1. Thus, with positive values of KA, for control system stability, the amplifier gain must be K A ๏ผ 12.16 . For K = 13.16, the Auxiliary Equation from the S2 row is 284.365 S 2 + 6580 = 0 or S = ๏ฑ j 4.81 That is, for K = 13.16, there are a pair of conjugate poles on the j๏ท axis, and the control system is marginally stable. (c) From the closed-loop transfer function of the system, the steady-state response is SVt ( S ) = (Vt )SS = lim S →0 KA 1 + KA For the amplifier gain of KA = 10, the steady-state response is (Vt )SS = 10 = 0.909 1 + 10 And the steady-state error is (Ve )SS = 1.0 − 0.909 = 0.091 13.3 System becomes unstable at about K a = 277. Anything with +/– about 10 of this answer should be considered correct. 334 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 13.4 13.5 Initial Values Ka = 100 Ka = 300 Ka = 30 Ka = 10 Vt = 1.0946 pu Vt = 1.0958 pu Vt = 1.1033 pu Vt = 1.0983 pu Vt = 1.1033 pu Efd = 2.913 Efd = 2.794 Efd = 3.311 Efd = 2.805 Efd = 2.827 (a) Converting constraints to a 100 MVA base: 100 ๐๐๐ด ) = 0.02 ๐. ๐ข. 200 ๐๐๐ด 100 ๐๐๐ด ) = 0.01667 ๐. ๐ข. ๐ 2,๐๐๐ค = 0.05 ( 300 ๐๐๐ด 100 ๐๐๐ด ) = 0.012 ๐. ๐ข. ๐ 3,๐๐๐ค = 0.06 ( 500 ๐๐๐ด ๐ 1,๐๐๐ค = 0.04 ( From Equation 13.2.3, the area frequency response characteristic ๐ฝ is: ๐ฝ=( ⇒ ๐ฝ=( 1 ๐ 1,๐๐๐ค + 1 ๐ 2,๐๐๐ค + 1 1 + +โฏ) ๐ 1 ๐ 2 1 1 1 1 ) = ๐๐๐. ๐๐๐ ๐. ๐. )=( + + ๐ 3,๐๐๐ค 0.02 0.01667 0.012 150 (b) The load decreases by 150 MW, so Δ๐๐ = − 100 = −1.5 ๐. ๐ข. Since the reference power setting does not change, Δ๐๐๐๐ = 0 Using equation 13.2.4: Δ๐๐ = Δ๐๐๐๐ − ๐ฝΔ๐ ⇒ Δ๐ = − ⇒ Δ๐ = − Δ๐๐ − Δ๐๐๐๐ ๐ฝ −1.5 − 0 = 0.00776 ๐. ๐ข. = ๐. ๐๐๐ ๐ฏ๐ 193.333 (c) For each individual turbine, the change in mechanical power is from Equation 13.2.1: Δ๐๐ = Δ๐๐๐๐ − ⇒ Δ๐๐1 = Δ๐๐๐๐ − ⇒ Δ๐๐2 = Δ๐๐๐๐ − 1 ๐ 1,๐๐๐ค 1 ๐ 2,๐๐๐ค ⇒ Δ๐๐3 = Δ๐๐๐๐ − Δ๐ = − Δ๐ = − 1 ๐ 3,๐๐๐ค 1 Δ๐ ๐ 1 0.00776 = −0.3879 ๐. ๐ข. = −๐๐. ๐๐ ๐ด๐พ 0.02 1 0.00776 = −0.4655 ๐. ๐ข. = −๐๐. ๐๐ ๐ด๐พ 0.01667 Δ๐ = − 1 0.00776 = −0.6466 ๐. ๐ข. = −๐๐. ๐๐ ๐ด๐พ 0.012 335 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 13.6 100 Now, Δ๐๐ = 100 = 1 ๐. ๐ข. and Δ๐๐๐๐ = 0 (a) Using Equation 13.2.4: Δ๐ = − Δ๐๐ − Δ๐๐๐๐ 1−0 =− = −5.172 × 10−3 ๐. ๐ข. = −๐. ๐๐๐ ๐ฏ๐ ๐ฝ 193.333 (b) Using Equation 13.2.1 with the new Δ๐: ⇒ Δ๐๐1 = Δ๐๐๐๐ − ⇒ Δ๐๐2 = Δ๐๐๐๐ − 1 ๐ 1,๐๐๐ค 1 ๐ 2,๐๐๐ค ⇒ Δ๐๐3 = Δ๐๐๐๐ − Δ๐ = − Δ๐ = − 1 ๐ 3,๐๐๐ค 1 (−5.172 × 10−3 ) = 0.2586 ๐. ๐ข. = ๐๐. ๐๐ ๐ด๐พ 0.02 1 (−5.172 × 10−3 ) = 0.3103 ๐. ๐ข. = ๐๐. ๐๐ ๐ด๐พ 0.01667 Δ๐ = − 1 (−5.172 × 10−3 ) = 0.4310 ๐. ๐ข. = ๐๐. ๐๐ ๐ด๐พ 0.012 13.7 Now, Δ๐ = 0.005 ๐. ๐ข. and Δ๐๐๐๐ = 0 Using Equation 13.2.1 with the new Δ๐: ⇒ Δ๐๐1 = Δ๐๐๐๐ − ⇒ Δ๐๐2 = Δ๐๐๐๐ − 1 ๐ 1,๐๐๐ค 1 ๐ 2,๐๐๐ค ⇒ Δ๐๐3 = Δ๐๐๐๐ − Δ๐ = − 1 (0.005) = −0.25 ๐. ๐ข. = −๐๐ ๐ด๐พ 0.02 Δ๐ = − 1 (0.005) = −0.3750 ๐. ๐ข. = −๐๐. ๐๐ ๐ด๐พ 0.01667 Δ๐ = − 1 (0.005) = −0.41667 ๐. ๐ข. = −๐๐. ๐๐๐ ๐ด๐พ 0.012 1 ๐ 3,๐๐๐ค 13.8 Now, Δ๐ = −0.005 ๐. ๐ข. Using Equation 13.2.1 with the new Δ๐: ⇒ Δ๐๐1 = Δ๐๐๐๐ − ⇒ Δ๐๐2 = Δ๐๐๐๐ − ⇒ Δ๐๐3 = Δ๐๐๐๐ − 1 ๐ 1,๐๐๐ค 1 ๐ 2,๐๐๐ค 1 ๐ 3,๐๐๐ค Δ๐ = − 1 (−0.005) = 0.25 ๐. ๐ข. = ๐๐ ๐ด๐พ 0.02 Δ๐ = − 1 (−0.005) = 0.3750 ๐. ๐ข. = ๐๐. ๐๐ ๐ด๐พ 0.01667 Δ๐ = − 1 (−0.005) = 0.41667 ๐. ๐ข. = ๐๐. ๐๐๐ ๐ด๐พ 0.012 336 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 13.9 (a) Using Rnew = Rold Sbase( new ) Sbase( old ) R1( new) = 0.04 1000 1000 = 0.08pu; R2( new) = 0.06 = 0.08pu 500 750 The area frequency-response characteristic is given by n 1 1 1 1 1 = + = + = 25pu R1 R2 0.08 0.08 k =1 Rk ๏ข =๏ฅ (b) The per-unit increase in load is 250 /1000 = 0.25 n n k =1 k =1 ๏ฆ n 1 ๏ถ ๏ท ๏f = ๏Pref ( total ) − ๏ข๏f ๏จ k =1 Rk ๏ธ ( ๏Pm )TOTAL = ๏ฅ ๏Pmk = ๏ฅ ๏Pref k − ๏ง ๏ฅ With ๏Pref ( total ) = 0 for steady-state conditions, ๏f = − 1 ๏ข ๏Pm = − 1 ( 0.25) = −10 ๏ด 10−3 pu 25 or ๏f = −10 ๏ด 10−3 ๏ด 60 = −0.6 Hz . 13.10 (a) First the regulation constants must be converted to a common 1000 MVA base: 1000 ๐๐๐ด ) = 0.08 ๐. ๐ข. ๐ 1,๐๐๐ค = 0.04 ( 500 ๐๐๐ด 1000 ๐๐๐ด ) = 0.05 ๐. ๐ข. ๐ 2,๐๐๐ค = 0.05 ( 1000 ๐๐๐ด 1000 ๐๐๐ด ) = 0.0667 ๐. ๐ข. ๐ 3,๐๐๐ค = 0.05 ( 750 ๐๐๐ด To solve for ๐ฝ, we use Equation 13.2.3: ๐ฝ=( ⇒ ๐ฝ=( 1 ๐ 1,๐๐๐ค + 1 ๐ 2,๐๐๐ค + 1 1 + +โฏ) ๐ 1 ๐ 2 1 1 1 1 ) = ๐๐. ๐ ๐. ๐. )=( + + ๐ 3,๐๐๐ค 0.08 0.05 0.0667 (b) Given Δ๐๐๐๐ = 0 and using Equation 13.2.4: Δ๐ = − Δ๐๐ − Δ๐๐๐๐ ๐ฝ Δ๐๐ = 200 ๐๐ = 0.2 ๐๐๐ด ⇒ Δ๐ = − 0.2 ๐. ๐ข. = −4.211 × 10−3 ๐. ๐ข. = −๐. ๐๐๐ ๐ฏ๐ 47.5 ๐. ๐ข. 337 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (c) Using Equation 13.2.1 with the new Δ๐ ⇒ Δ๐๐1 = Δ๐๐๐๐ − ⇒ Δ๐๐2 = Δ๐๐๐๐ − ⇒ Δ๐๐3 = Δ๐๐๐๐ − 1 ๐ 1,๐๐๐ค 1 ๐ 2,๐๐๐ค 1 ๐ 3,๐๐๐ค Δ๐ = − 1 (−0.253) = 0.0526 ๐. ๐ข. = ๐๐. ๐๐๐ ๐ด๐พ 0.08 Δ๐ = − 1 (−0.253) = 0.0842 ๐. ๐ข. = ๐๐. ๐๐๐ ๐ด๐พ 0.05 Δ๐ = − 1 (−0.253) = 0.0632 ๐. ๐ข. = ๐๐. ๐๐๐ ๐ด๐พ 0.0667 13.11 Given the contingency is a loss of 65 MW, Δ๐๐ = 65 ๐๐ = 0.65 ๐. ๐ข. for a 100 MVA base. Assuming Δ๐๐๐๐ = 0, from Equation 13.2.4: Δ๐ = − Δ๐๐ ๐ฝ In order to solve for ๐ฝ, all the regulation constraints R are the same, and the new base power is the same (100 MVA). ๐๐๐๐ ๐,๐๐๐ค ๐ ๐๐๐ค = ๐ ๐๐๐ ( ) ๐๐๐๐ ๐,๐๐๐ 1 1 1 ๐ฝ=( + + โฏ+ ) ๐ 1,๐๐๐ค ๐ 2,๐๐๐ค ๐ ๐,๐๐๐ค =( ๐๐๐๐ ๐,๐๐๐,1 ๐๐๐๐ ๐,๐๐๐,2 ๐๐๐๐ ๐,๐๐๐,๐ + +โฏ+ ) ๐๐๐๐ ๐,๐๐๐ค โ ๐ ๐๐๐ ๐๐๐๐ ๐,๐๐๐ค โ ๐ ๐๐๐ ๐๐๐๐ ๐,๐๐๐ค โ ๐ ๐๐๐ ⇒๐ฝ= ∑๐๐๐๐ ๐,๐๐๐ ๐๐๐๐ ๐,๐๐๐ค โ ๐ ๐๐๐ Neglecting the PEAR69 generator, which is the contingency generator, we get: ๐ฝ= ⇒ Δ๐ = − 1102 ๐๐๐ด = 220.4 ๐. ๐ข. 100 ๐๐๐ด (0.05 ๐. ๐ข. ) Δ๐๐ 0.65 =− = −0.00295 ๐. ๐ข. = −0.177 ๐ป๐ง ๐ฝ 220.4 338 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Looking at the plot, it’s noted that the final frequency is approximately 59.831 Hz, which is close to the calculated frequency drop of 0.177 Hz. The largest frequency deviation is at 3.708 seconds, with a frequency drop of approximately 0.416 Hz, from 60 Hz to 59.584 Hz. 13.12 The final frequency is approximately 59.832 Hz, indicating that doubling the H values does not impact the final frequency significantly. However, the largest bus frequency deviation occurs much later, at 5.125 seconds, with a deviation of 0.353 Hz, from 60 Hz to 59.647 Hz. 13.13 Using a 60 Hz base, the per unit frequency change is − 0.12/60 = − 0.002 p.u. Since all the governor R values are identical (on their own base), the total MVA of the generation is given by ๏ P * R /๏f = (2800*0.04)/0.02 = 5600 MW. 339 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 13.14 Adding (13.2.4) for each area with ๏Pref = 0 : ๏Pm1 + ๏Pm 2 = − ( ๏ข1 + ๏ข 2 ) ๏f 400 = − ( 400 + 600 ) ๏f ๏ ๏f = −0.4 H z ๏Ptie 2 = ๏Pm 2 = −๏ข2 ๏f = −600 ( −0.4 ) = 240MW ๏Ptie1 = −๏Ptie 2 = −240 MW 13.15 In steady-state, ACE2 = ๏Ptie 2 + B f 2 ๏f = 0 and ๏Ptie 2 = ๏Pm 2 ๏๏Pm 2 = ๏Ptie 2 = − B f 2 ๏f and ๏Pm1 = − ๏ข1๏f Also ๏Pm1 + ๏Pm 2 = 400 MW Solving the equations: − ( ๏ข1 + B f 2 ) ๏f = 400 ๏f = −400 = −0.4 Hz 400 + 600 ๏Ptie 2 = − ( 600 )( −0.4 ) = 240MW ๏Ptie1 = −๏Ptie 2 = −240MW Note: The results are the same as those in Problem 13.14. That is, LFC is not effective when employed in only one area. 13.16 In steady-state: ACE1 = ๏Ptie1 + B f 1๏f = 0 ACE2 = ๏Ptie2 + B f 2 ๏f = 0 Adding ( ๏Ptie1 + ๏Ptie 2 ) + ( B f 1 + B f 2 ) ๏f = 0 Therefore, ๏f = 0 ; ๏Ptie 1 = 0 and ๏Ptie 2 = 0 . That is, in steady-state the frequency error is returned to zero, area 1 picks up its own 400 MW load increase. 340 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 13.17 (a) (13.15) LFC in area 2 alone. In steady-state ACE2 = ๏Ptie 2 + B f 2 ๏f = 0 ๏๏Pm 2 = ๏Ptie 2 = − B f 2 ๏f and ๏Pm1 = − ๏ข1๏f Also ๏Pm1 + ๏Pm 2 = −300 Solving: − ( ๏ข1 + B f 2 ) ๏f = −300 ๏f = 300 = 0.3Hz 400 + 600 ๏Ptie 1 = − ( 400 )( 0.3) = −120MW ๏Ptie 2 = −๏Ptie 1 = 120 MW (b) (13.16) LFC employed in both areas 1 and 2. ACE1 = ๏Ptie1 + B f 1๏f = 0 ACE2 = ๏Ptie2 + B f 2 ๏f = 0 ( ) Adding: ( ๏Ptie1 + ๏Ptie 2 ) + B f1 + B f 2 ๏f = 0 Thus ๏f = 0 ๏Ptie1 = 0 and ๏Ptie 2 = 0 13.18 (a) The per-unit load change in area 1 is ๏PL1 = 187.5 = 0.1875 1000 The per-unit steady-state frequency deviation is ๏WSS = −๏PL1 −0.1875 = = −0.005 ๏ฆ 1 ๏ถ ๏ฆ 1 ๏ถ ( 20 + 0.6 ) + (16 + 0.9 ) + D2 ๏ท ๏ง + D1 ๏ท + ๏ง ๏จ R1 ๏ธ ๏จ R2 ๏ธ Thus, the steady-state frequency deviation in Hz is ๏f = ( −0.005 )( 60 ) = −0.3Hz and the new frequency is f = f0 + ๏f = 60 − 0.3 = 59.7 Hz . The change in mechanical power in each area is ๏Pm1 = − ๏W −0.005 =− = 0.1pu = 100 MW R1 0.05 ๏Pm 2 = − ๏W −0.005 =− = 0.08pu = 80 MW R2 0.0625 341 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Thus area 1 increases the generation by 100 MW and area 2 by 80 MW at the new operating frequency of 59.7 Hz. The total change in generation is 180 MW, which is 7.5 MW less than the 187.5 MW load change because of the change in the area loads due to frequency drop. The change in area 1 load is ๏W ๏ D1 = ( −0.005 )( 0.6 ) = −0.003pu or −3.0 MW , and the change in area 2 load is ๏W ๏ D2 = ( −0.005 )( 0.9 ) = −0.0045pu or −4.5 MW. Thus, the change in the total area load is −7.5MW. The tie-line power flow is ๏ฆ 1 ๏ถ ๏P12 = ๏W ๏ง + D2 ๏ท = −0.005 (16.9 ) = −0.0845pu ๏จ R2 ๏ธ = −84.5MW That is, 84.5 MW flows from area 2 to area 1. 80 MW comes from the increased generation in area 2, and 4.3MW comes from the reduction in area 2 load due to frequency drop. (b) With the inclusion of the ACE5 , the frequency deviation returns to zero (with a settling time of about 20 seconds). Also, the tie-line power change reduces to zero, and the increase in area 1 load is met by the increase in generation ๏Pm1 . 13.19 Given that the goal is to provide a total of 60° of phase lead compensation, each lead-lag block ๐๐๐ provides 30°. Considering that this is provided at 2 Hz, ๐๐ = 2๐๐ = 2๐(2) = 4๐ ๐ ๐๐ . Using Equation 13.4.3: ๐ผ= 1 − sin ๐ 1 − sin 30° 1 = = 1 + sin ๐ 1 + sin 30° 3 Using Equation 13.4.4: ๐1 = 1 ๐ ๐ √๐ผ = 0.138 ⇒ ๐2 = ๐ผ๐1 = 0.0459 ⇒ ๐ป๐ = ๐. ๐๐๐ ๐ ⇒ ๐ป๐ = ๐. ๐๐๐๐ ๐ 342 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 13.20 Given T1 = T3 = 0.4s and T2 = T4 = 0.1s, we can use Equations 13.4.4 to solve a simple system of equations: 0.4 = 1 0.1 = ๐ผ0.4 ๐ ๐ √๐ผ ⇒ ๐ผ = 0.25 ⇒ ๐๐ = 5 Then we use Equation 13.4.3 to solve for ๐: 0.25 = 1 − sin ๐ ⇒ ๐ = ๐๐. ๐๐๐๐° 1 + sin ๐ ๐๐ = 2๐๐ ⇒ ๐ = 5 ⇒ ๐ = ๐. ๐๐๐ ๐ฏ๐ 2๐ PW13.21 Given the total phase lead is 0° at 1.36 Hz, using Equations 13.4.3 and 13.4.4: ๐๐ = 2 ๐ × 1.36 ๐ป๐ง ๐ผ= ๐1 = 1 − sin ๐ 1 − sin 0° = =1 1 + sin ๐ 1 + sin 0° 1 ๐ ๐ √๐ผ = 0.117 ⇒ ๐2 = ๐ผ๐1 = 0.117 ⇒ ๐1 = 0.117 ๐ ⇒ ๐2 = 0.117 ๐ 343 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Without a stabilizer enabled, the frequency oscillations are as seen above, with a damping of 5.825% for a 1.36 Hz mode. Setting the values for T1, T2, T3, and T4 to the ones above, a Ks value of 45 results in almost instability, as seen in the Generator Vs plot: Thus, when we tune Ks value to 15, we get a damping of 4.225% at 1.421 Hz. PW13.22 Given the total phase lead is 30° at 1.36 Hz, using Equations 13.4.3 and 13.4.4: ๐๐ = 2 ๐ × 1.36 ๐ป๐ง ๐ผ= ๐1 = 1 − sin ๐ 1 − sin 15° = = 0.589 1 + sin ๐ 1 + sin 15° 1 ๐ ๐ √๐ผ = 0.153 ⇒ ๐2 = ๐ผ๐1 = 0.0898 ⇒ ๐1 = 0.153 ๐ ⇒ ๐2 = 0.0898 ๐ Similar to PW13.21, there is a 1.36 Hz mode with damping of 5.825% to be worked on. A value of Ks of 120 gives the following plot: 344 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Thus, when we tune the Ks value to 40, we get a damping of 7.32% at 1.492 Hz. 345 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Chapter 14 Transmission Lines: Transient Operation 14.1 From the results of Example 14.2: V ( x, t ) = i ( x, t ) = E x ๏ฆ x๏ถ E ๏ฆ ๏ถ U −1 ๏ง t − ๏ท + U −1 ๏ง t + − 2๏ด ๏ท 2 v ๏จ v๏ธ 2 ๏จ ๏ธ E x ๏ฆ x๏ถ E ๏ฆ ๏ถ U −1 ๏ง t − ๏ท − U −1 ๏ง t + − 2๏ด ๏ท 2 Zc v 2 Z v ๏จ ๏ธ ๏จ ๏ธ c For t = ๏ด / 2 = l : 2v 3 ๏ถ ๏ฆl ๏ถ ๏ฆ ๏ง 2−x๏ท E ๏ง x − 2l ๏ท ๏ฆ ๏ด๏ถ E V ๏ง x, ๏ท = U −1 ๏ง ๏ท + U −1 ๏ง ๏ท ๏จ 2๏ธ 2 ๏ง๏ง v ๏ท๏ท 2 ๏ง๏ง v ๏ท๏ท ๏จ ๏ธ ๏จ ๏ธ 3 ๏ถ ๏ฆl ๏ถ ๏ฆ ๏ง 2−x๏ท ๏ง x − 2l ๏ท E E ๏ฆ ๏ด๏ถ i ๏ง x, ๏ท = U −1 ๏ง U −1 ๏ง ๏ท− ๏ท ๏จ 2 ๏ธ 2 Zc ๏ง๏ง v ๏ท๏ท 2 Z c ๏ง๏ง v ๏ท๏ท ๏จ ๏ธ ๏จ ๏ธ l For t = ๏ด = : v V ( x,๏ด ) = E E E ๏ฆl−x๏ถ E ๏ฆ x −l ๏ถ ๏ฆl −x๏ถ ๏ฆ x −l ๏ถ U −1 ๏ง U −1 ๏ง U −1 ๏ง ๏ท + U −1 ๏ง ๏ท i ( x,๏ด ) = ๏ท− ๏ท 2 2 Zc ๏จ v ๏ธ 2 ๏จ v ๏ธ ๏จ v ๏ธ 2 Zc ๏จ v ๏ธ For t = 2๏ด = V ( x, 2๏ด ) = 2l : w E E E ๏ฆ 2l − x ๏ถ E ๏ฆx๏ถ ๏ฆ 2l − x ๏ถ ๏ฆx๏ถ U −1 ๏ง U −1 ๏ง U −1 ๏ง ๏ท ๏ท + U −1 ๏ง ๏ท i ( x, 2๏ด ) = ๏ท− 2 2 Zc ๏จ v ๏ธ 2 ๏จv๏ธ ๏จ v ๏ธ 2 Zc ๏จv๏ธ 346 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 14.2 From Example 14.2 ๏ R = 1 and ๏ S = 0 For a ramp voltage source, EG ( S ) = E S2 Then from Eqs (14.2.10) and (14.2.11), ๏ฆx ๏ถ S ๏ง − 2๏ด ๏ท ๏น ๏ฆ E ๏ถ๏ฆ 1 ๏ถ ๏ฉ −vSx V ( x, S ) = ๏ง 2 ๏ท๏ง ๏ท ๏ชe + e ๏จ v ๏ธ ๏บ ๏จ S ๏ธ๏จ 3 ๏ธ ๏ซ ๏ป ๏ฆx ๏ถ S ๏ง − 2๏ด ๏ท ๏น ๏ฆ E ๏ถ ๏ฆ 1 ๏ถ ๏ฉ −vSx v ๏ธ I ( x, S ) = ๏ง 2 ๏ท ๏ง ๏บ ๏ท ๏ชe − e ๏จ ๏จ S ๏ธ ๏จ 3 Zc ๏ธ ๏ซ ๏ป Taking the inverse Laplace transform: V ( x, t ) = i ( x, t ) = E x ๏ฆ x๏ถ E ๏ฆ ๏ถ U −2 ๏ง t − ๏ท + U −2 ๏ง t + − 2๏ด ๏ท 3 ๏จ v๏ธ 3 ๏จ v ๏ธ E ๏ฆ x๏ถ E ๏ฆ x ๏ถ U −2 ๏ง t − ๏ท − U −2 ๏ง t + − 2๏ด ๏ท 3 Zc ๏จ v ๏ธ 3 Zc ๏จ v ๏ธ At the center of the line, where x = l / 2 , ๏ฆl ๏ถ E ๏ฆ ๏ด๏ถ E ๏ฆ 3๏ด ๏ถ V ๏ง , t ๏ท = U −2 ๏ง t − ๏ท + U −2 ๏ง t − ๏ท 2๏ธ ๏จ2 ๏ธ 3 ๏จ 2๏ธ 3 ๏จ E ๏ฆl ๏ถ ๏ฆ ๏ด๏ถ E ๏ฆ 3๏ด ๏ถ i ๏ง ,t ๏ท = U −2 ๏ง t − ๏ท − U −2 ๏ง t − ๏ท 2๏ธ ๏จ 2 ๏ธ 3 Zc ๏จ 2 ๏ธ 3 Zc ๏จ 347 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 14.3 From Eq (14.2.12) with Z R = S ( 2 LR ) and Z G = Z c : S ( 2 LR ) Z −1 S − c Zc 2 LR ๏R ( S ) = = Zc S ( 2 LR ) +1 S + 2 LR Zc ๏S ( S ) = 0 Then from Eq (14.2.10) with EG ( S ) = E S ๏ฉ ๏น Z ๏ถ ๏ฆ S − c ๏ท ๏ฆx ๏ถ๏บ ๏ช ๏ง − Sx − 2 ๏ด 2 LR S ๏ง๏จ v ๏ท๏ธ E๏ฆ1๏ถ ๏บ ๏ทe V ( x, S ) = ๏ง ๏ท ๏ช e v + ๏ง S ๏จ 2 ๏ธ๏ช ๏บ ๏ง S + Zc ๏ท ๏ง ๏ท ๏ช ๏บ 2 L R ๏ธ ๏จ ๏ซ ๏ป Using partial-fraction expansion ๏ฉ Sx ๏ฆ ๏น ๏ถ − x ๏ฆ ๏ถ ๏ช ๏บ ๏ง ๏ท S ๏ง − 2๏ด ๏ท E e v −1 2 ๏ทe ๏จ v ๏ธ ๏บ V ( x, S ) = ๏ช +๏ง + 2๏ช S ๏บ ๏ง S S + Ze ๏ท ๏ง ๏ท ๏ช ๏บ 2 LR ๏ธ ๏จ ๏ซ ๏ป Taking the inverse Laplace transform: V ( x, t ) = −1 ๏ฆ x ๏ถ ๏ง t + − 2๏ด ๏ท ๏น E x๏ถ E ๏ฉ x ๏ฆ ๏ฆ ๏ถ U −1 ๏ง t − ๏ท + ๏ช −1 + 2e 2 LR | Zc ๏จ v ๏ธ ๏บ U −1 ๏ง t + − 2๏ด ๏ท 2 ๏จ v ๏ธ 2 ๏ซ๏ช ๏จ v ๏ธ ๏ป๏บ At the center of the line, where x = l : 2 3 ๏ถ ๏ฆ ๏ฉ ๏ง t − 2๏ด ๏ท ๏น −๏ง ๏ท๏บ ๏ช ๏ง๏ง 2 LR | Z c ๏ท๏ท ๏ฆl ๏ถ E ๏ฆ ๏ด๏ถ E๏ช ๏ฆ 3๏ด ๏ถ ๏จ ๏ธ ๏บU V ๏ง , t ๏ท = U −1 ๏ง t − ๏ท + −1 + 2e −1 ๏ง t − ๏ท ๏บ 2๏ธ ๏จ2 ๏ธ 2 ๏จ 2๏ธ 2 ๏ช ๏จ ๏ช ๏บ ๏ซ ๏ป 14.4 ๏ R = 0; EG ( S ) = E S 348 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. From Eq (14.2.10) ๏ฉ ๏น ๏ช E Z / 2 LG ๏บ ๏ฉ − Sxv ๏น ๏บ e ๏บ V ( x, S ) = ๏ช c Z ๏ช S๏ช ๏ป S + c ๏บ๏ซ ๏ช๏ซ 2 LG ๏บ๏ป Using partial fraction expansion: ๏ฉ ๏น ๏ช1 ๏บ − Sx 1 ๏บe v V ( x, S ) = E ๏ช − ๏ช S S + Zc ๏บ ๏ช๏ซ 2 LG ๏บ๏ป Taking the inverse Laplace transform, ๏ฆ t−x/v ๏ถ ๏ฉ ๏น − ๏ง๏ง ๏ท๏ท ๏ฆ x๏ถ V ( x, t ) = E ๏ช1 − e ๏จ 2 LG / Zc ๏ธ ๏บ U −1 ๏ง t − ๏ท ๏จ v๏ธ ๏ช๏ซ ๏บ๏ป At the center of the line, where x = l / 2 : t −๏ด / 2 ) − ( ๏ฉ ๏น ๏ฆl ๏ถ 2 LG / Z c V ๏ง , t ๏ท = E ๏ช1 − e ๏บ U −1 ( t − ๏ด / 2 ) ๏จ2 ๏ธ ๏ช๏ซ ๏บ๏ป 349 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 14.5 ๏R = 4 −1 = 0.6 4 +1 EG ( S ) = 1 −1 ๏S = 3 = −0.5 1 +1 3 E S ๏ฆx ๏ถ ๏ฉ − Sx S − 2๏ด ๏น ๏ฉ ๏น ๏ชe v + 0.6e ๏ง๏จ v ๏ท๏ธ ๏บ E๏ช 1 ๏บ ๏ซ ๏ป V ( x, S ) = ๏ช ๏บ −2 S๏ด 1 S ๏ช + 1 ๏บ 1 − ( 0.6 )( −0.5 ) e ๏ซ๏ช 3 ๏ป๏บ ๏ฆx ๏ถ ๏ฉ − Sx S ๏ง − 2๏ด ๏ท ๏น 3E ๏ช e v + 0.6e ๏จ v ๏ธ ๏บ V ( x, S ) = ๏บ 4S ๏ช 1 + 0.3e−2 S๏ด ๏ซ๏ช ๏ป๏บ V ( x, S ) = ๏ฆx ๏ถ S ๏ง − 2๏ด ๏ท ๏น 3E ๏ฉ − Sxv 2 ๏จv ๏ธ ๏ฉ1 − 0.3e −2 S๏ด + 0.3 e + 0.6 e ( ) e−4 S๏ด ๏ช ๏บ๏ซ 4S ๏ซ ๏ป V ( x, S ) = ๏ฆx ๏ถ ๏ฆx ๏ถ ๏ฆx ๏ถ s ๏ง − 2๏ด ๏ท − S ๏ง + 2๏ด ๏ท S ๏ง − 4๏ด ๏ท 3E ๏ฉ − Sxv ๏จv ๏ธ − 0.3e ๏จ v ๏ธ − 0.18e ๏จ v ๏ธ e + 0.6 e ๏ช 4S ๏ซ +0.09e V ( x, t ) = ๏ฆx ๏ถ − S ๏ง + 4๏ด ๏ท ๏จv ๏ธ ๏ฆx ๏ถ S ๏ง − 6๏ด ๏ท ๏ธ + 0.054e ๏จ v ๏น ๏ป ๏น ๏บ ๏ป 3E ๏ฉ ๏ฆ x๏ถ x ๏ฆ ๏ถ U −1 ๏ง t − ๏ท + 0.6U −1 ๏ง t + − 2๏ด ๏ท ๏ช 4 ๏ซ ๏จ v๏ธ v ๏จ ๏ธ x x ๏ฆ ๏ถ ๏ฆ ๏ถ −0.3U −1 ๏ง t − − 2๏ด ๏ท − 0.18U −1 ๏ง t + − 4๏ด ๏ท v ๏จ v ๏ธ ๏จ ๏ธ x x ๏ฆ ๏ถ ๏ฆ ๏ถ ๏น +0.09U −1 ๏ง t − − 4๏ด ๏ท + 0.054U −1 ๏ง t + − 6๏ด ๏ท ๏บ v ๏จ v ๏ธ ๏จ ๏ธ ๏ป At the center of the line, where x = l : 2 ๏ฆ l ๏ถ 3E ๏ฉ ๏ฆ ๏ด๏ถ ๏ฆ 3๏ด ๏ถ ๏ฆ 5 ๏ถ V ๏ง ,t ๏ท = U −1 ๏ง t − ๏ท + 0.6U −1 ๏ง t − ๏ท − 0.3U −1 ๏ง t − ๏ด ๏ท ๏ช 2 ๏ธ ๏จ2 ๏ธ 4 ๏ซ ๏จ 2๏ธ ๏จ ๏จ 2 ๏ธ ๏ฆ 7๏ด ๏ถ ๏ฆ 9๏ด ๏ถ ๏ฆ 11๏ด ๏ถ −0.18U −1 ๏ง t − ๏ท + 0.09U −1 ๏ง t − ๏ท + 0.054U −1 ๏ง t − 2 ๏ธ 2 ๏ธ 2 ๏ท๏ธ ๏จ ๏จ ๏จ ๏น ๏บ ๏ป 350 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 1 ๏ด 10 −6 L 3 14.6 (a) Z c = = =100. ๏ 1 C ๏ด 10 −10 3 V= ๏ด= 1 LC = 1 ๏ฆ1 −6 ๏ถ๏ฆ 1 −10 ๏ถ ๏ง 3 ๏ด 10 ๏ท๏ง 3 ๏ด 10 ๏ท ๏จ ๏ธ๏จ ๏ธ = 3.0 ๏ด 108 m/s l 30 ๏ด 103 = = 1 ๏ด 10−4 S = 0.1 ms v 3 ๏ด 108 ZG −1 Zc (b) ๏ S = =0 ZG +1 Zc ZR (S ) = R ( SL ) SL + R EG ( S ) = = 100 S RS 100S = R S + 50,000. S+ L ZR (S ) S −1 −1 Zc −50,000 S + 50,000 ๏R ( S ) = = = S ZR (S ) 2 S + 50,000 +1 +1 S + 50,000 Zc ๏R ( S ) = −25,000. per unit S + 25,000. (c) Using (14.2.11) with x = l (receiving end) 25000 − S๏ด ๏น ๏ฉ100 / S ๏น ๏ฉ − S๏ด I R ( S ) = I ( l, S ) = ๏ช ๏บ ๏ชe + S + 25000 e ๏บ 200 ๏ซ ๏ป๏ซ ๏ป IR (S) = ๏น − S๏ด 1 ๏ฉ 1 1 1 ๏ฉ1 25000 −1 ๏น − S๏ด e ๏ช + ๏บe = ๏ช + + 2 ๏ซ๏ช S S ( S + 25000 ) ๏ป๏บ 2 ๏ซ S S S + 25000 ๏บ๏ป IR (S ) = 1 ๏ฉ2 −1 ๏น − S๏ด + e ๏ช 2 ๏ซ 5 S + 25000 ๏บ๏ป 351 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. − ( t −๏ด ) ๏น 1๏ฉ (d) iR ( t ) = ๏ช2 − e 0.04๏ด10−3 ๏บ U −1 ( t − ๏ด ) A 2๏ซ ๏ป 14.7 (a) L 2 ๏ด 10 −6 = = 400 ๏ C 1.25 ๏ด 10 −11 Zc = w= 1 LC ๏ด= = 1 ( 2 ๏ด 10 )(1.25 ๏ด 10 ) −6 −11 = 2.0 ๏ด 108 m s l 100. ๏ด 103 = = 5 ๏ด 10−4 S = 0.5ms v 2 ๏ด 108 ZG −1 Zc 100 (b) ๏ S = = 0 EG ( S ) = ZG S +1 Zc Z R ( S ) = SLR + 1 SC R LR = 100 ๏ด 10 −3 H C R = 1 ๏ด 10 −6 F ZR (S ) L 1 −1 S R + −1 Zc Z c SC R Z c ๏R (S ) = = L 1 ZR (S ) S R + +1 +1 Z c SC R Z c Zc Zc 1 S+ LR LRC R S 2 − 4 ๏ด 103 S + 1 ๏ด 107 ๏R ( S ) = = 2 Z 1 S + 4 ๏ด 103 S + 1 ๏ด 107 S2 + c S + LR LRC R S2 − (c) Using (14.2.10) with x = l (receiving end) VR ( S ) = 100 ๏ฆ 400 ๏ถ ๏ฉ − S๏ด ๏ฆ S 2 − 4 ๏ด 103 S + 1 ๏ด 107 ๏ถ − S๏ด ๏น e ๏บ ๏ชe + ๏ง 2 3 7 ๏ท S ๏ง๏จ 400 + 400 ๏ท๏ธ ๏ซ ๏จ S + 4 ๏ด 10 S + 1 ๏ด 10 ๏ธ ๏ป ๏ฉ 1 ( S − 2000 + j 2449.5 )( S − 2000 − j 2449.5 ) ๏น − S๏ด VR ( S ) = 50 ๏ช + ๏บe ๏ซ๏ช S S ( S + 2000 + j 2449.5 )( S + 2000 − j 2449.5 ) ๏ป๏บ 352 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฉ1 1 ๏น − S๏ด − j1.633 + j1.633 VR ( S ) = 50 ๏ช + + + ๏บe ๏ซ S S S + 2000 + j 2449.5 S + 2000 − j 2449.5 ๏ป ๏ฉ2 ๏น −3.266 ( 2449.5 ) VR ( S ) = 50 ๏ช + ๏บ e− S๏ด 2 2 ๏ช๏ซ S ( S + 2000 ) + ( 2449.5 ) ๏บ๏ป − ( t −๏ด ) ๏ฌ ๏ผ ๏ฏ ๏ฏ VR ( t ) = 50 ๏ญ2 − 3.266e 0.5๏ด10−3 sin ๏ฉ๏ซ( 2449.5)( t − ๏ด ) ๏น๏ป ๏ฝU −1 ( t − ๏ด ) ๏ฏ ๏ฏ ๏ฎ ๏พ (d) 14.8 (a) Zc = w= ๏ด= L 0.999 ๏ด 10 −6 = = 299.73 ๏ C 1.112 ๏ด 10 −11 1 LC = 1 ( 0.999 ๏ด 10−6 )(1.112 ๏ด 10−11 ) = 3.0 ๏ด 108 m s l 60. ๏ด 103 = = 1.9998 ๏ด 10−4 S = 0.2 ms v 3.0 ๏ด 108 ZG −1 Z (b) ๏ S = c =0 ZG +1 Zc EG ( S ) = ๏ฆ 1 ๏ถ RR ๏ง ๏ท ๏จ SC R ๏ธ = (1/ C R ) ZR = 1 1 RR + S+ SC R RR C R E S2 RR = 150. ๏ C R = 1 ๏ด 10 −6 F ๏ฆ 1 ๏ถ ๏ง ๏ท ๏จ Z cC R ๏ธ − 1 ZR 1 −1 S+ Z RR C R ๏R = c = ZR ๏ฆ 1 ๏ถ +1 ๏ง ๏ท Zc ๏จ Z cC R ๏ธ + 1 S + 1/ Rx C R 353 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฆ 1 1 ๏ถ −S − ๏ง − ๏ท RRC R Z cC R ๏ธ −S − 3.330 ๏ด 103 ๏จ ๏R = = per unit ๏ฆ 1 1 ๏ถ S + 1.0003 ๏ด 10 4 S+๏ง + ๏ท ๏จ RRC R Z cC R ๏ธ (c) Using (14.2.10) with x = 0 (sending end) V ( 0, S ) = VS ( S ) = (d) E ๏ฆ 1 ๏ถ ๏ฉ ๏ฆ −S − 3.33 ๏ด 103 ๏ถ −2 S๏ด ๏น e ๏บ ๏ช1 + S 2 ๏ง๏จ 2 ๏ท๏ธ ๏ซ ๏ง๏จ S + 1.0003 ๏ด 10 4 ๏ท๏ธ ๏ป VS ( S ) = ๏ถ E๏ฆ 1 −S − 3.33 ๏ด 103 e −2 S๏ด ๏ท ๏ง๏ง 2 + 2 4 ๏ท 2๏จS S ( S + 1.0003 ๏ด 10 ) ๏ธ VS ( S ) = E ๏ฉ 1 ๏ฆ −0.333 −6.67 ๏ด 10 −5 6.67 ๏ด 10 −5 ๏ถ −2 S๏ด ๏น + + e ๏บ ๏ช 2 +๏ง 2 ๏ซ S ๏จ S2 S S + 1.0003 ๏ด 10 4 ๏ท๏ธ ๏ป VS ( t ) = − ( t − 2๏ด ) ๏ผ๏ฏ ๏ฉ ๏น E ๏ฏ๏ฌ −5 −5 0.1๏ด10 −3 tU t − 0.333 t − 2 ๏ด + 6.69 ๏ด 10 − 6.67 ๏ด 10 e ( ) ( ) ๏ญ −1 ๏ช ๏บ U −1 ( t − 2๏ด ) ๏ฝ 2 ๏ฎ๏ฏ ๏ซ ๏ป ๏พ๏ฏ 354 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 14.9 14.10 14.11 355 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 14.12 14.13 (a) 356 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. For a voltage wave VA + arriving at the junction: VA + + VA− = VB+ KVL : KCL : I A+ + I A− = I B+ + (1) VB+ RJ ๏ฆ 1 VA+ VA− VB+ VB+ 1 ๏ถ VB+ − = + = VB+ ๏ง + ๏ท= Zc Z Z c RJ ๏จ Z c RJ ๏ธ Z eq where Z eq = (2) RJ Z c RJ + Z c Solving (1) and (2): ๏ฆ Z eq ๏ถ −1๏ท ๏ง Z ๏ทV + = ๏ V + VA− = ๏ง c AA A ๏ง Z eq ๏ท A + 1 ๏ท๏ท ๏ง๏ง ๏จ Zc ๏ธ ๏ฆ ๏ฆ Z eq ๏ถ ๏ถ ๏ง 2๏ง ๏ท๏ท Zc ๏ธ ๏ท + ๏จ ๏ง + VB = V = ๏ BAVA+ ๏ง Z eq ๏ท A +1 ๏ท ๏ง ๏ง Zc ๏ท ๏จ ๏ธ Since Line Sections A and B have the same characteristic impedance Z c , ๏ BB = ๏ AA and ๏ AB = ๏ BA . ๏ด= w = 100 ๏ด 103 1 = ms 3 ๏ด 108 3 (b) 357 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 14.14 For a voltage wave VA+ arriving at the junction from line A, KVL VA+ + VA− = VB+ (1) VB+ = VC+ (2) VB+ = VD+ (3) KCL I A+ + I A− = I B+ + I C+ + I D+ VA+ VA− VB+ VC+ VD+ − = + + Z A Z A Z B ZC Z D (4) Using Eqs (2) and (3) in Eq (4): ๏ฆ 1 VA+ VA− 1 1 ๏ถ VB+ − = VB+ ๏ง + + ๏ท= ZA ZA ๏จ Z B ZC Z D ๏ธ Z eq Where Z eq = Z B // ZC // Z D = (5) 1 1 1 1 + + Z B ZC Z D Solving Eqs (1) and (5): Z eq ๏ฉ ๏น −1 ๏บ ๏ช ZA ๏บ V + = ๏ AAVA + VA − = ๏ช ๏ช ( Z eq / Z A ) + 1 ๏บ A ๏ช ๏บ ๏ซ ๏ป ๏ฉ 2 ( Z eq / Z A ) ๏น ๏บ VA + = ๏ BAVA + VB + = ๏ช ๏ช๏ซ ( Z eq / Z A ) + 1 ๏บ๏ป Also VC + = ๏CAVA + ๏CA = ๏ DA = ๏ BA VD + = ๏ DAVA + 358 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 14.15 (a) SLG −1 Zc S − Z c / LG ๏S ( S ) = = SLG S + Z c / LG +1 Zc 1 −1 −3 ๏R = 4 = 1 +1 5 4 ๏ฆ ๏ถ ๏ง ๏ฆ ๏ถ Z E 1 1 ๏ท๏ท c ๏ง V1 ( S ) = ๏ง = E − ๏ท Z ๏ท S ๏จ SLG + Z c ๏ธ ๏งS S+ c ๏ท ๏ง LG ๏ธ ๏จ (b) For 0 ๏ฃ t ๏ฃ 5๏ด : ๏ฆ 3๏ถ ๏ฆ −3 9 ๏ถ V ( l, S ) = ๏ง 1 − ๏ท V1 ( S ) e − S๏ด + ๏ง + ๏ท ๏ S ( S ) V1 ( S ) e − S (3๏ด ) 5 5 25 ๏ธ ๏จ ๏ธ ๏จ ๏ฆ ๏ถ ๏ง 2E ๏ง 1 1 ๏ท๏ท − S๏ด 6 E ๏ฆ 1 ๏ถ ๏ฆ S − Z c / LG ๏ถ๏ฆ Z c / LG ๏ถ − S (3๏ด ) V ( l, S ) = − e − ๏ง ๏ท๏ง ๏ทe Zc ๏ท 5 ๏งS 25 ๏ง๏จ S ๏ท๏ธ ๏จ S + Z c / LG ๏ธ๏จ S + Z c / LG ๏ธ S + ๏ง LG ๏ท๏ธ ๏จ ๏ฆ ๏ถ ๏ฆ ๏ถ ๏ง ๏ท ๏ง ๏ท 2 Z c / LG ๏ท − S (3๏ด ) 2E ๏ง 1 1 ๏ท − S๏ด 6 E ๏ง 1 1 V ( l, S ) = − e + − − e 2 ๏ท Zc ๏ท Zc ๏ฆ 5 ๏งS 25 ๏ง๏ง S ๏ถ Z ๏ท S+ S+ c ๏ง LG ๏ท๏ธ LG ๏ง S + L ๏ท ๏ท ๏ง ๏จ G ๏ธ ๏ธ ๏จ ๏จ Taking the inverse Laplace transform: V ( l, t ) = −( t −๏ด ) − ( t − 3๏ด ) − t − 3๏ด ๏ถ 2 ( t − 3๏ด ) L( / Z ) ๏ถ 2E ๏ฆ 6E ๏ฆ ๏ง 1 − e LG / Zc ๏ทU −1 ( t − ๏ด ) + ๏ง 1 − e LG / Zc − e G c ๏ทU −1 ( t − 3๏ด ) ๏ท ๏ท 5 ๏ง๏จ 25 ๏ง๏จ LG / Z c ๏ธ ๏ธ 359 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 14.16 (a) Z G = 100 ๏ Z c = 400 ๏ E = 100 kV ๏ฉ ๏น ๏ช Zc / 2 ๏บ ๏ฆ 200 ๏ถ V1 ( t ) = E U −1 ( t ) ๏ช ๏บ = 100 ๏ง ๏ท U −1 ( t ) Z ๏จ 200 + 100 ๏ธ ๏ช c + ZG ๏บ ๏ซ๏ช 2 ๏ป๏บ V1 ( t ) = 66.67 U −1 ( t ) kV (b) ZG − 1 100 − 1 Z ( 1 c / 2) ๏S = = 200 =− ZG 100 3 +1 +1 200 ( Zc / 2 ) ๏ R = −1 (c) (d) 400 −1 1 = 14.17 (a) ๏ S = 200 400 3 +1 200 100 −1 1 ๏ R = 300 =− 100 2 +1 300 300 −1 1 ๏ AA = 200 = 300 5 +1 200 ๏ฆ 300 ๏ถ 2๏ง 200 ๏ท๏ธ 6 ๏ BA = ๏จ = 300 5 +1 200 360 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 200 −1 1 ๏ BB = 300 =− 200 5 +1 300 (b) ๏ฆ 200 ๏ถ 2๏ง 300 ๏ท๏ธ 4 ๏ AB = ๏จ = 200 5 +1 300 Voltage ๏S = 1 1 1 ๏ AA = ๏ BB = − 3 5 5 6 4 ๏ BA = ๏ AB = 5 5 ๏R = − 1 2 At t = 0, the 10 kA pulsed current source at the junction encounters 200 // 300 = 120 ๏. Therefore the first voltage waves, which travel on both the cable and overhead line, are pulses of width 50 ๏ญs and magnitude 10 kA๏ด 120 ๏ = 1200 kV , V1 ( S ) = E (1 − e−TS ) E = 1200. kV T = 50.๏ญ s S (c) 14.18 361 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Nodal Equations: Note that ๏ด = 0.2 ms and ๏t = 0.02 ms 0.02 Vk ( t ) = 10 − I k ( t − 0.2 ) 0.011Vm ( t ) = I m ( t − 0.2 ) − I L ( t − 0.02 ) Solving: Vk ( t ) = 50.0 ๏ฉ๏ซ10 − I k ( t − 0.2 )๏น๏ป (a) Vm ( t ) = 90.909 ๏ฉ๏ซ I m ( t − 0.2 ) − I L ( t − 0.02 )๏น๏ป (b) Dependent current sources: Eq (12.4.10) I k ( t ) = I m ( t − 0.2 ) − 2 Vm ( t ) 100 (c) Eq (12.4.9) I m ( t ) = I k ( t − 0.2 ) + 2 Vk ( t ) 100 (d) Eq (12.4.14) I L ( t ) = I L ( t − 0.02 ) + Vm ( t ) (e) 500 Equations (a) – (e) can now be solved iteratively by digital computer for time t = 0, 0.02, 0.04 ms . Note that I k ( ) and I m ( ) on the right hand side of Eqs (a) – (e) are zero during the first 10 iterations while their arguments ( ) are negative. 14.19 362 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Nodal Equations: ๏ฉ1 1 ๏น V1 ( t ) = 200 ๏ช − U −1 ( t − 0.1) − I1 ( t − .1667 ) ๏บ 4 4 ๏ซ ๏ป (a) V2 ( t ) = 133.33 ๏ฉ๏ซ I 2 ( t − .1667 ) − I 3 ( t − .1667 )๏น๏ป (b) V3 ( t ) = V2 ( t ) (c) V4 ( t ) = 0 (d) Dependent current sources: ๏ฆ 2 ๏ถ Eq (12.4.10) I1 ( t ) = I 2 ( t − .1667 ) − ๏ง ๏ท V2 ( t ) ๏จ 400 ๏ธ (e) ๏ฆ 2 ๏ถ Eq (12.4.9) I 2 ( t ) = I1 ( t − .1667 ) + ๏ง ๏ท V1 ( t ) ๏จ 400 ๏ธ (f) ๏ฆ 2 ๏ถ Eq (12.4.10) I 3 ( t ) = I 4 ( t − .1667 ) − ๏ง ๏ท V4 ( t ) ๏จ 400 ๏ธ (g) ๏ฆ 2 ๏ถ Eq (12.4.9) I 4 ( t ) = I 3 ( t − .1667 ) + ๏ง ๏ท V3 ( t ) ๏จ 400 ๏ธ (h) Equations (a) – (h) can be solved iteratively for t = 0, ๏t,2๏t where ๏t = 0.03333ms . I1 ( ) , I 2 ( ) , I 3 ( ) and I 4 ( ) on the right hand side of Eqs (a) – (h) are zero for the first 5 iterations. 14.20 E = 100.kV Z G = Z c = 400. ๏ = 500.๏ญ s ๏t = 100.๏ญ s ( 2LR / ๏t ) = 2000. ๏ ๏ฆ ๏t ๏ถ ๏ง ๏ท = 50. ๏ ๏จ 2C R ๏ธ Nodal equations: 363 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฉ๏ฆ 1 ๏น 1 ๏ถ + 0 0 ๏ช๏ง ๏บ ๏ท 1 ๏ฉ ๏น − I k ( t − 500 ) ๏ช๏จ 400 400 ๏ธ ๏บ ๏ฉV t ๏น ๏ช ๏บ ( ) 4 ๏ช ๏บ๏ช k ๏บ ๏ช ๏บ 1 1 ๏ถ −1 ๏ฆ ๏ช ๏บ ๏ชVm ( t ) ๏บ = ๏ช I m ( t − 500 ) − I L ( t − 100 ) ๏บ 0 ๏ง 400 + 2000 ๏ท 2000 ๏ช ๏บ๏ช ๏จ ๏ธ ๏ช ๏บ ๏ช ๏บ ๏ซ Vc ( t ) ๏บ๏ป ๏ช I L ( t − 100 ) + I C ( t − 100 ) ๏บ −1 1 ๏ถ๏บ ๏ฆ 1 ๏ช ๏ซ๏ช ๏ป๏บ 0 + ๏ง ๏ท๏บ ๏ช 2000 50 2000 ๏จ ๏ธ ๏ซ ๏ป Solving: ๏ฉ1 ๏น Vk ( t ) = 200 ๏ช − I k ( t − 500 ) ๏บ ๏ซ4 ๏ป ๏ฉVm ( t ) ๏น ๏ฉ334.7 8.136 ๏น ๏ฉ I m ( t − 500 ) − I L ( t − 100 ) ๏น ๏บ๏ช ๏ช ๏บ=๏ช ๏บ ๏ซ Vc ( t ) ๏ป ๏ช๏ซ8.136 48.98๏บ๏ป ๏ซ I L ( t − 100 ) + I C ( t − 100 ) ๏ป Current sources: ๏ฆ 2 ๏ถ (12.4.9) I m ( t ) = I k ( t − 500 ) + ๏ง ๏ท Vk ( t ) ๏จ 400 ๏ธ ๏ฆ 2 ๏ถ (12.4.10) I k ( t ) = I m ( t − 500 ) − ๏ง ๏ท Vm ( t ) ๏จ 400 ๏ธ (12.4.14) I L ( t ) = I L ( t − 100 ) + 1 ๏ฉVm ( t ) − VC ( t ) ๏น๏ป 1000 ๏ซ ๏ฆ 1 ๏ถ (12.4.18) IC ( t ) = − IC ( t − 100 ) + ๏ง ๏ท VC ( t ) ๏จ 25 ๏ธ 364 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. t Vk Vm VC Im Ik IL IC ๏ญs kV kV kV kA kA kA kA 0 50.0 0 0 0.25 0 0 0 100 50.0 0 0 0.25 0 0 0 200 50.0 0 0 0.25 0 0 0 300 50.0 0 0 0.25 0 0 0 400 50.0 0 0 0.25 0 0 0 500 50.0 83.68 2.034 0.25 0.2398 0.0816 0.0814 600 50.0 57.69 0.25 365 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 14.21 E = 100. kV Z G = Z c = 299.73 ๏ RR = 150 ๏ ๏ถ = 25. ๏ ๏t = 50.๏ญ s ๏ญ= 200.๏ญ s ๏ฆ๏ง ๏t ๏ท ๏จ 2C R ๏ธ Writing nodal equations: ๏ฉ๏ฆ 1 ๏น 1 ๏ถ 0 t ๏ฉ ๏น ๏ช๏ง 299.73 + 299.73 ๏ท ๏บ ๏ธ ๏ช๏จ ๏บ ๏ฉ Vk ( t ) ๏น = ๏ช 2.9973 − I k ( t − 200 ) ๏บ ๏ช ๏บ ๏บ ๏ช 1 1 ๏ถ ๏บ ๏ซVm ( t ) ๏ป ๏ช ๏ฆ 1 0 + + ๏ช๏ซ I m ( t − 200 ) + I C ( t − 50 ) ๏บ๏ป ๏ช ๏บ ๏ง 299.73 150. 25. ๏ท ๏จ ๏ธ ๏ป๏บ ๏ซ๏ช Solving: Vk ( t ) = 50.t − 149.865 I k ( t − 200 ) Vm ( t ) = 19.999 ๏ฉ๏ซ I m ( t − 200 ) + I C ( t − 50 ) ๏น๏ป Current sources: ๏ฆ 2 ๏ถ I m ( t ) = I k ( t − 200 ) + ๏ง ๏ท Vk ( t ) ๏จ 299.73 ๏ธ ๏ฆ 2 ๏ถ I k ( t ) = I m ( t − 200 ) − ๏ง ๏ท Vm ( t ) ๏จ 299.73 ๏ธ (12.4.9) (12.4.10) ๏ฆ 1 ๏ถ I C ( t ) = − I C ( t − 50 ) + ๏ง ๏ท Vm ( t ) ๏จ 12.5 ๏ธ (12.4.18) t Vk Vm Im Ik IC ๏ญs kV kV kA kA kA 0 0.0 0 0 0 0 50 0.0025 0 1.66 ๏ด 10−5 0 0 100 0.0050 0 3.33 ๏ด 10−5 0 0 150 0.0075 0 5.0 ๏ด 10−5 0 0 200 0.0100 0 6.67 ๏ด 10−5 0 0 250 0.0125 3.32 ๏ด 10−4 8.34 ๏ด 10−5 1.43 ๏ด 10−5 2.66 ๏ด 10−5 300 0.0150 1.20 ๏ด 10−3 10.0 ๏ด 10−5 2.53 ๏ด 10−5 6.94 ๏ด 10−5 366 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 14.22 Nodal Equations: −1 10 ๏ฉV1 ( t ) ๏น ๏ฉ 0.1767 −0.1667๏น ๏ฉ ๏น ๏ช ๏บ = ๏ช −0.1667 0.1767 ๏บ ๏ช ๏บ ๏บ๏ป ๏ซ − I 2 ( t − 0.2 ) ๏ป ๏ซV2 ( t ) ๏ป ๏ช๏ซ −1 ๏ฉV3 ( t ) ๏น ๏ฉ 0.1767 −0.1667 ๏น ๏ฉ I 3 ( t − 0.2 ) ๏น ๏บ ๏ช ๏ช ๏บ=๏ช ๏บ ๏ซV4 ( t ) ๏ป ๏ซ๏ช −0.1667 0.1677 ๏ป๏บ ๏ซ − I L ( t − 0.02 )๏ป (a) (b) (c ) (d ) Dependent current sources: Eq (14.4.10) ๏ฆ 2 ๏ถ I 2 ( t ) = I 3 ( t − 0.2 ) − ๏ง ๏ท V3 ( t ) ๏จ 100 ๏ธ (e) Eq (14.4.9) ๏ฆ 2 ๏ถ I 3 ( t ) = I 2 ( t − 0.2 ) + ๏ง ๏ท V2 ( t ) ๏จ 100 ๏ธ (f) Eq (14.4.14) I L ( t ) = I L ( t − 0.02 ) + V4 ( t ) 500 Equations (a) – (g) can be solved iteratively for t = 0, ๏t,2๏t (g) where ๏t = 0.02 ms . I 2 ( ) and I 3 ( ) on the right hand side of Eqs (a) – (g) are zero for the first 10 iterations. 14.23 (a) The maximum 60-Hz voltage operating voltage under normal operating conditions is ( ) 1.08 115/ 3 = 71.7 kV From Table 14.2, select a station-class surge arrester with 84-kV MCOV. This is the station-class arrester with the lowest MCOV that exceeds 71.7kV, providing the greatest protective margin and economy. (Note: where additional economy is required, an intermediate-class surge arrester with an 84-kV MCOV may be selected.) 367 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (b) From Table 14.2 for the selected station-class arrester, the maximum discharge voltage (also called Front-of-Wave Protective Level) for a 10-kA impulse current cresting in 0.5 ๏ญs ranges from 2.19 to 2.39 in per unit of MCOV, or 184 to 201 kV, depending on arrester manufacturer. Therefore, the protective margin varies from ( 450 − 201) = 249kV to ( 450 − 184 ) = 266kV . Note. From Table 3 of the Case Study for Chapter 14, select a VariSTAR Type AZE stationclass surge arrester, manufactured by Cooper Power Systems, rated at 108kV with an 84-kV MCOV. From Table 3 for the selected arrester, the Front-of-Wave Protective Level is 313kV, and the protective margin is therefore (450–313) = 137kV or 137๏ฏ84 = 1.63 per unit of MCOV. 14.24 The maximum 60-Hz line-to-neutral voltage under normal operating conditions on the HV side of ( ) the transformer is 1.1 345 / 3 = 219.1kV . From Table 3 of the Case Study for Chapter 14, select a VariSTAR Type AZE station-class surge arrester, manufactured by Cooper Power Systems, with a 276-kV rating and a 220-kV MCOV. This is the type AZE station-class arrester with the lowest MCOV that exceeds 219.1 kV, providing the greatest protective margin and economy. For this arrester, the maximum discharge voltage (also called Front-of-Wave Protective Level) for a 10-kA impulse current cresting in 0.5 ๏ญs is 720kV. The protective margin is (1300 – 720) = 580 kV = 580๏ฏ220 = 2.64 per unit of MCOV. 368 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Chapter 15 Power Distribution 15.1 See Figure 15.2. Yes, laterals on primary radial systems are typically protected from short circuits. Fuses are typically used for short-circuit protection on the laterals. 15.2 The three-phase, four-wire multigrounded primary system is the most widely used primary distribution configuration. The fourth wire in these Y-connected systems is used as a neutral for the primaries, or as a common neutral when both primaries and secondaries are present. Usually the windings of distribution substation transformers are Y-connected on the primary distribution side, with the neutral point grounded and connected to the common neutral wire. The neutral is also grounded at frequent intervals along the primary, at distribution transformers, and at customers’ service entrances. Sometimes distribution substation transformers are grounded through an impedance (approximately one ohm) to limit short circuit currents and improve coordination of protective devices. 15.3 See Table 15.1 for a list of typical primary distribution voltages in the United States [1–9]. The most common primary distribution voltage is 15-kV Class, which includes 12.47, 13.2, and 13.8 kV. 15.4 Reclosers are typically used on overhead primary radial systems (see Figure 15.2) and on overhead primary loop systems (see Figure 15.7). Studies have shown that the large majority of faults on overhead primaries are temporary, caused by lightning flashover of line insulators, momentary contact of two conductors, momentary bird or animal contact, or momentary tree limb contact. As such, reclosers are used on overhead primary systems to reduce the duration of interruptions for these temporary faults. Reclosers are not used on primary systems that are primarily underground, because faults on underground systems are usually permanent. 15.5 See Table 15.2. Typical secondary distribution voltages in the United States are 120/240 V, singlephase, three-wire for Residential applications; 208Y/120V, three-phase, four-wire for Residential/Commercial applications; and 480Y/277V, three-phase, four-wire for Commercial/Industrial/High-Rise applications. 15.6 Secondary Network Advantages Secondary networks provide a high degree of service reliability and operating flexibility. They can be used to supply high-density load areas in downtown sections of cities. In secondary network systems, a forced or scheduled outage of a primary feeder does not result in customer outages. Because the secondary mains provide parallel paths to customer loads, secondary cable failures usually do not result in customer outages. Also, each secondary network is designed to share the load equally among transformers and to handle large motor starting and other abrupt load changes without severe voltage drops. Secondary Network Disadvantage Secondary networks are expensive. They are typically used in high-density load areas where revenues justify grid costs. Another disadvantage is that network protectors that are used to prevent “power back-feeding” do not protect against the secondary network cable from overload that could be caused by faults. The network protector does not protect the (secondary) network cable from overload 369 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 15.7 As stated in Section 15.3, more than 260 cities in the United States have secondary networks. If one Googles “secondary electric power distribution networks United States,” one of the web sites that appears in the Google list is: Interconnection of Distributed Energy Resources in Secondary... File Format: PDF/Adobe Acrobat. Electric Power Research Institute and EPRI are registered service marks of the Electric ... SECONDARY DISTRIBUTION NETWORK OVERVIEW. Power System Design and Operation ... Printed on recycled paper in the United States of America ... mydocs.epri.com/docs/public/000000000001012922.pdf From this publication, three cities in the Western Interconnection that have secondary distribution systems are: Portland, Seattle, and San Francisco. 15.8 (a) At the OA rating of 40 MVA, I OA,L = 40 (13.8 ๏ด ๏ ๏ณ) = 1.673 kA per phase Similarly, I FA, L = 50 (13.8 ๏ด ๏ 3) I FOA L = 65 = 2.092 kA per phase (13.8 ๏ด ๏ 3) = 2.719 kA per phase (b) The transformer impedance is 9% or 0.09 per unit based on the OA rating of 40 MVA. Using (3.3.11), the transformer per unit impedance on a 100 MVA system base is: ๏ฆ 100 ๏ถ Z transformerPUSystem Base = 0.09 ๏ง ๏ท = 0.225 per unit ๏จ 40 ๏ธ (c) For a three-phase bolted fault, using the transformer OA ratings as the base quantities, Isc3๏ช = VF Z transformerPU = 1.0 = 11.11 per unit = (11.11)(1.673) ( 0.09 ) = 18.59 kA/phase Note that in (c) above, the OA rating is used to calculate the short-circuit current, because the transformer manufacturer gives the per unit transformer impedance using the OA rating as the base quantity. 15.9 (a) During normal operations, all four transformers are in service. Using a 5% reduction to account for unequal transformer loadings, the summer normal substation rating is 1.20 ๏ด (30 + 33.3 + 33.3 + 33.3) ๏ด 0.95 = 148 MVA. With all four transformers in service, the substation can operate as high as 148 MVA without exceeding the summer normal rating of 120% of each transformer rating. 370 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. (b) The summer allowable substation rating, based on the single-contingency loss of one of the 33.3 MVA transformers, would be 1.5 ๏ด (30 + 33.3 + 33.3) ๏ด 0.95 = 137 MVA. Each of the three transformers that remain in service is each allowed to operate at 150% of its nameplate rating for two hours (reduced by 5% for unequal transformer loadings), which gives time to perform switching operations to reduce the transformer loading to its 30-day summer emergency rating. However, from the solution to (c), the 30-day summer emergency rating of the substation is 119.3 MVA. Since it is assumed that a maximum reduction of 10% in the total substation load can be achieved through switching operations, the summer allowable substation rating is limited to 119.3/0.9 = 132.6 MVA. Note that, even though the normal summer substation rating is 148 MVA, it is only allowed to operate up to 132.6 MVA, so that in case one transformer has a permanent outage: (1) the remaining in-service transformers do not exceed their two-hour emergency ratings; and (2) switching can be performed to reduce the total substation load to its 30-day emergency rating. (c) Based on the permanent loss of one 33.3-MVA transformer, the 30-day summer emergency rating of the substation is 1.3 ๏ด (30 + 33.3 + 33.3) ๏ด 0.95 = 119.3 MVA. When one transformer has a permanent failure, each of the other three transformers can operate at 130% of their rating for 30 days (reduced by 5% for unequal transformer loadings), which gives time to replace the failed transformer with a spare that is in stock. 15.10 Based on a maximum continuous current of 2.0 kA per phase, the maximum power through each circuit breaker at 12.5 kV is 12.5 ๏ด 2.0 ๏ด ๏3 = 43.3 MVA. The summer allowable substation rating under the single-contingency loss of one transformer, based on not exceeding the maximum continuous current of the circuit breakers, is 43.3 ๏ด 3 ๏ด 0.95 = 123.4 MVA. Comparing this result with the summer allowable substation rating of 132.6 MVA determined in Problem 15.9(b), we conclude that the circuit breakers limit the summer allowable substation rating to 123.4 MVA. 15.11 (a) The power factor angle of the load is ๏ฑL = cos–1(0.85) = 31.79°. Using Figure 2.5, the load reactive power is: QL = SLsin(๏ฑL) = 10 ๏ด sin (31.79°) = 5.268 Mvar absorbed Also, the real power absorbed by the load is SL ๏ด p.f. = 10 ๏ด 0.85 = 8.5 MW Similarly, the power factor angle of the source is ๏ฑS = cos–1(0.90) = 25.84°. The real power delivered by the source to the load is 8.5 MW, which is unchanged by the shunt capacitors. Using Figure 2.5, the source reactive power is: ๏ฉP ๏น ๏ฉ 8.5 ๏น QS = SS sin (๏ฑS ) = ๏ช S ๏บ sin (๏ฑ S ) = ๏ช ๏บ sin (25.84°) ๏ซ 0.90 ๏ป ๏ซ p.f. ๏ป = 4.117 Mvar delivered The reactive power delivered by the shunt capacitors is the load reactive power minus the source reactive power: QC = QL − QS = 5.268 − 4.117 = 1.151 Mvar (b) The power factor angle of the load is ๏ฑL = cos–1(0.90) = 25.84°. Using Figure 2.5, the load reactive power is: QL = SL sin (๏ฑ L ) = 10 ๏ด sin ( 25.84° ) = 4.359 Mvar absorbed 371 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. Also, the real power absorbed by the load is SL ๏ด p.f. = 10 ๏ด 0.90 = 9.0 MW Similarly, the power factor angle of the source is ๏ฑS = cos–1(0.95) = 18.19°. The real power delivered by the source to the load is 9.0 MW, which is unchanged by the shunt capacitors. Using Figure 2.5, the source reactive power is: ๏ฉP ๏น ๏ฉ 9.0 ๏น QS = SS sin (๏ฑ S ) = ๏ช S ๏บ ๏ด sin (๏ฑS ) = ๏ช ๏บ sin(18.19°) ๏ซ 0.95 ๏ป ๏ซ p.f. ๏ป = 2.958 Mvar delivered The reactive power delivered by the shunt capacitors is the load reactive power minus the source reactive power: QC = QL − QS = 4.359 − 2.958 = 1.401 Mvar (c) Comparing the results of (a) which requires 1.151 Mvar to increase the power factor from 0.85 to 0.90 lagging; and (b) which requires 1.401 Mvar (22% higher than 1.151 Mvar) to increase the power factor from 0.90 to 0.95 lagging; it is concluded that improving the high powerfactor load requires more reactive power. 15.12 (a) Without the capacitor bank, the total impedance seen by the source is: Z TOTAL = RLINE + jX LINE + 1 1 RLOAD Z TOTAL = 3 + j 6 + + 1 jX LOAD 1 1 1 + 40 j 60 1 33.333 Z TOTAL = 3 + j 6 + = 3 + j6 + 0.03 33.69๏ฐ −33.69๏ฐ Z TOTAL = 3 + j 6 + 27.74 + j18.49 = 30.74 + j 24.49 = 39.30 ๏/phase 38.54° (a1) The line current is: ๏ฆ 13.8 ๏ถ 1.05 ๏ง ๏ท /0° 0.2129 VSLN ๏3 ๏ธ ๏จ I LINE = = = kA/phase Z TOTAL −38.54° ๏ฆ 39.30 ๏ถ ๏ง 38.54๏ฐ ๏ท ๏จ ๏ธ (a2) The voltage drop across the line is: Z ๏ฆ 0.2129 ๏ถ VDROP = LINE = (3 + j 6) ๏ง ๏ท I LINE ๏จ −38.54° ๏ธ ๏ฆ 6.708 ๏ถ๏ฆ 0.2129 ๏ถ =๏ง ๏ท๏ง ๏ท ๏จ 63.43° ๏ธ๏จ −38.54° ๏ธ 1.428 kV 24.89° | VDROP | = 1.428 kV (a3) The load voltage is: 372 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. ๏ฆ ๏ถ ๏ง 13.8 ๏ท 1.428 ๏ท − VLOAD = VSLN − Z LINE I LINE = 1.05 ๏ง ๏ง ๏ 3 ๏ท 24.89° ๏ง ๏ท ๏จ ๏ฐ๏ฐ ๏ธ = 8.366 − (1.295 + j 0.60010 ) = 7.071 − j 0.6010 = 7.096 kVLN −4.86° |VLOAD | = 7.096 ๏ 3 = 12.29 kVLL (a4) The real and reactive power delivered to the three-phase load is: 3(VLOADLN )2 3(7.096)2 PLOAD3๏ช = = = 3.776 MW RLOAD 40 QLOAD3๏ช = 3 (VLOADLN )2 3(7.096)2 = = 2.518 Mvar X LOAD 60 (a5) The load power factor is: (a6) ๏ฉ ๏ฉ ๏ฆ Q ๏ถ๏น ๏ฆ 2.518 ๏ถ ๏น p.f. = cos ๏ช tan −1 ๏ง ๏ท ๏บ = cos ๏ช tan −1 ๏ง ๏ท ๏บ = 0.83 lagging ๏จ P ๏ธ๏ป ๏จ 3.776 ๏ธ ๏ป ๏ซ ๏ซ The real and reactive line losses are: PLINELOSS3๏ช = 3I LINE 2 RLINE = 3(0.2129)2 (3) = 0.408 MW QLINELOSS3๏ช = 3 I LINE 2 X LINE = 3(0.2129)2 (6) = 0.816 Mvar (a7) The real power, reactive power, and apparent power delivered by the distribution substation are: PSOURCE3๏ช = PLOAD3๏ช + PLINELOSS3๏ช = 3.776 + 0.408 = 4.184 MW QSOURCE3๏ช = QLOAD3๏ช + QLINELOSS3๏ช = 2.518 + 0.816 = 3.334 Mvar SSOURCE3๏ช = ๏ (4.1842 + 3.334 2 ) = 5.350 MVA (b) With the capacitor bank in service, the total impedance seen by the source is: 1 Z TOTAL = RLINE + jX LINE + 1 1 1 + − RLOAD jX LOAD jXC Z TOTAL = 3 + j6 + 1 1 1 1 + − 40 j 60 j60 1 43.42 = 43 + j6 = ๏/phase 0.025 7.94° (b1) The line current is: ๏ฆ 13.8 ๏ถ 1.05 ๏ง ๏ท 0° VSLN 0.1927 ๏3 ๏ธ ๏จ I LINE = = = kA/phase Z TOTAL 43.42 − 7.94° 7.94 ๏ฐ (b2) The voltage drop across the line is: Z TOTAL = 3 + j6 + 373 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 1.293 ๏ฆ 6.708 ๏ถ ๏ฆ 0.1927 ๏ถ VDROP = Z LINE I LINE = ๏ง ๏ท ๏ง − 7.94° ๏ท = 55.49° kV 63.43° ๏จ ๏ธ ๏จ ๏ธ | VDROP | = 1.293 kV (b3) The load voltage is: 1.293 ๏ฆ 13.8 ๏ถ VLOAD = VSLN − Z LINE I LINE = 1.05 ๏ง ๏ท /0° − 55.49° ๏จ ๏3 ๏ธ = 8.366 − (0.7325 + j1.065) = 7.633 − j1.065 = 7.707 kVLN −7.94° |VLOAD | = 7.707 ๏ 3 = 13.35 kVLL (b4) The real and reactive power delivered to the three-phase load is: 3(VLOADLN )2 3(7.707)2 PLOAD3๏ช = = = 4.455 MW RLOAD 40 QLOAD3๏ช = 3(VLOADLN )2 3(7.707)2 = = 2.970 Mvar X LOAD 60 (b5) The load power factor is: ๏ฉ ๏ฉ ๏ฆ Q ๏ถ๏น ๏ฆ 2.970 ๏ถ๏น p.f. = cos ๏ชtan −1 ๏ง ๏ท๏บ = cos ๏ชtan −1 ๏ง ๏ท๏บ = 0.83 lagging ๏จ P ๏ธ๏ป ๏จ 4.455 ๏ธ๏ป ๏ซ ๏ซ (b6) The real and reactive line losses are: PLINELOSS3๏ช = 3I LINE 2 RLINE = 3(0.1927)2 (3) = 0.3342 MW QLINELOSS3๏ช = 3 I LINE 2 X LINE = 3(0.1927)2 (6) = 0.6684 Mvar (b7) The reactive power delivered by the shunt capacitor bank is: 3(VLOADLN )2 3(7.707)2 QC = = = 2.970 Mvar XC 60 (b8) The real power, reactive power, and apparent power delivered by the distribution substation are: PSOURCE3๏ช = PLOAD3๏ช + PLINELOSS3๏ช = 4.455 + 0.3342 = 4.789 MW QSOURCE3๏ช = QLOAD3๏ช + QLINELOSS3๏ช − QC = 2.970 + 0.6684 − 2.97 = 0.6684 Mvar SSOURCE3๏ช = ๏ (4.7892 + 0.66842) = 4.835 MVA (c) Comparing the results of (a) and (b), with the shunt capacitor bank in service, the real power delivered to the load increases by 18% (from 3.776 to 4.445 MW) while at the same time: 374 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. • The line current decreases from 0.2129 to 0.1927 kA/phase • The real line losses decrease from 0.408 to 0.334 MW • The reactive line losses decrease from 0.816 to 0.668 Mvar • The voltage drop across the line decreases from 1.428 to 1.293 kV • The reactive power delivered by the source decreases from 3.334 to 0.6684 Mvar • The load voltage increases from 12.29 to 13.35 kVLL The above benefits are achieved by having the shunt capacitor bank (instead of the distribution substation) deliver reactive power to the load. 15.13 (a) Using all the outage data from the Table in (15.7.1) – (15.7.4): 342 + 950 + 125 + 15 + 2200 + 4000 + 370 4500 = 1.7782 interruptions/year SAIFI = (14.4 ๏ด 342) + (151.2 ๏ด 950) + (89.8 ๏ด 125) + (654.6 ๏ด 15) + (32.7 ๏ด 2200) + (10053 ๏ด 4000) + (40 ๏ด 370) 4500 SAIDI = 8992.966 minutes/year = 149.88 hours/year SAIDI = SAIDI 8992.966 = = 5057.34 minutes/year = 84.289 hours/year SAIFI 1.7782 8760 ๏ด 4500 − [(14.4 ๏ด 342) + (151.2 ๏ด 950) + (89.8 ๏ด 125) + (654.6 ๏ด 15) + (32.7 ๏ด 2200) + (10053 ๏ด 4000) + (40 ๏ด 370)]/60 ASAI = 8760 ๏ด 4500 ASAI = 0.98289 = 98.289% CAIDI = (b) Omitting the major event on 11/04 2010 and using the remaining outage data from the table in (15.7.1) – (15.7.4): 342 + 950 + 125 + 15 + 2200 + 370 SAIFI = = 0.889 interruptions/year 4500 (14.4 ๏ด 342) + (151.2 ๏ด 950) + (89.8 ๏ด 125) + (654.6 ๏ด 15) + (32.7 ๏ด 2200) + (40 ๏ด 370) SAIDI = 4500 SAIDI = 56.966 minutes/year SAIDI 56.966 = = 64.079 minutes/year SAIFI 0.889 8760 ๏ด 4500 − [(14.4 ๏ด 342) + (151.2 ๏ด 950) + (89.8 ๏ด 125) + (654.6 ๏ด 15) + (32.7 ๏ด 2200) + (40 ๏ด 370)]/60 ASAI = 8760 ๏ด 4500 ASAI = 0.99989 = 99.989% CAIDI = Comparing the results of (a) and (b), the CAIDI is 84.289 hours/year including the major event versus 64.079 minutes/year or 1.068 hours/year excluding the major event. 375 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 15.14 Using the outage data from the two tables, and omitting the major event: 200 + 600 + 25 + 90 + 700 + 1500 + 100 + 342 + 950 + 125 + 15 + 2200 + 370 SAIFI = 2000 + 4000 SAIFI = 1.203 interruptions/year SAIDI = [(8.17 ๏ด 200) + (71.3 ๏ด 600) + (30.3 ๏ด 25) + (267.2 ๏ด 90) + (120 ๏ด 700) + (10 ๏ด 1500) + (40 ๏ด 100) + (14.4 ๏ด 342) + (151.2 ๏ด 950) + (89.8 ๏ด 125) + (654.6 ๏ด 15) + (32.7 ๏ด 2200) + (40 ๏ด 370)]/[2000 + 4000] SAIDI = 428,568.3/6000 = 71.43 minutes/year SAIDI 71.43 = = 59.375 minutes/year SAIFI 1.203 ASAI = [8760 ๏ด 6000 − 428,568.3/60]/[8760 ๏ด 6000] = 0.9999 = 99.99% CAIDI = 15.15 The optimal solution space is rather flat around a value of 0.066 MW for total system losses. The below system solution represents an optimal (or near optimal) solution. 376 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 15.16 The losses can be reduced by balancing the taps; opening some of the capacitors can also help reduce losses. The below system solution has reduced the losses to 0.063 MW. Again the solution space is flat so there are a number of near optimal solutions that would be acceptable. 15.17 Because of the load voltage dependence, the total load plus losses are minimized by reducing the voltages to close to the minimum constraint of 0.97 per unit. Again, the solution space is quite flat, with an optimal (or near optimal) solution shown below with case losses of 0.086 MW (versus a starting value of 0.129 MW). 377 © 2023 Cengage Learning®. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part. 15.18 Initially, the Total Load+Losses is 10.640 MW. By adjusting the tap ratios and the status of the capacitor banks as seen below, while maintaining the constraint that bus voltages must remain above 0.97 p.u., the minimum Total Load+Losses is 9.900 MW. 15.19 Initially, the Total Load+Losses is 7.748 MW. By adjusting the tap ratios and the status of the capacitor banks as seen below, while maintaining the constraint that bus voltages must remain above 0.97 p.u., the minimum Total Load+Losses is 6.812 MW. 378 © 2023 Cengage Learning®. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )