3-1 Chapter 2: JOB-ORDER COSTING Dr. Le Hoang Oanh Job Order Costing A job is a single unit or group of units identifiable as being produced to distinct customer specifications A job can be a – Client – Engagement – Project – Contract 3-2 Types of Product Costing Systems Process Costing Job-order Costing v A company produces many units of a single product (Homogeneous goods, large quantity) v One unit of product is indistinguishable from other units of product. v The identical nature of each unit of product enables assigning the same average cost per unit. Types of Product Costing Systems Process Costing Job-order Costing v A company produces many units of a single product.companies: Example v unit of product is indistinguishable 1.One Weyerhaeuser (paper manufacturing) from other units of product. 2. Reynolds Aluminum (refining aluminum ingots) 3.The Coca-Cola bottling identical(mixing nature and of each unit beverages) of product enables v assigning the same average cost per unit. 3-3 Types of Product Costing Systems Process Costing Job-order Costing v Many different products are produced each period (Batches of identifiable, tailor-made products). v Products are manufactured to order (User-specific services). v The unique nature of each order requires tracing or allocating costs to each job, and maintaining cost records for each job. Types of Product Costing Systems Process Costing v v v Job-order Costing Many different products are produced each period. Example companies: Products are manufactured to order. 1. Boeing (aircraft manufacturing) unique nature of each order requires tracing or 2.The Bechtel International (large scale construction) costs to each job, and maintaining cost 3.allocating Walt Disney Studios (movie production) records for each job. 3-4 Comparing Process and Job-Order Costing Number of jobs worked Cost accumulated by Average cost computed by Job-Order Process Many Individual Job Single Product Job Department Department Job Order Costing System Which of the following companies would be likely to use job-order costing rather than process costing? a. Scott Paper Company for Kleenex. b. Architects. c. Heinz for ketchup. d. Caterer for a wedding reception. e. Builder of commercial fishing vessels. 3-5 Methods of Product Costing Cost Accumulation System defines Cost Object Method of assigning costs to production Valuation Method specifies How product costs will be measured Six Possibilities V A L M U E A T T H I O O D N COSTING SYSTEM Job Order Process § Actual § Normal § Standard § Actual § Normal § Standard 3-6 Job Order Costing System Each job is a cost object Costs are accumulated for each job A job can consist of one or more units of output There is a subsidiary ledger for each job Job Order Costing System WIP Subsidiary Ledger Job 1 100 Job 2 200 Job 1 + Job 2 + Job 3 Job 3 500 WIP Control = = WIP Control Job 1 100 Job 2 200 Job 3 500 Total 800 3-7 Job-Order Costing Let’s view Joborder costing in normal cost system Job-Order Costing Manufacturing overhead (OH) Direct material Trac ed d irec to e tly ach job ctly e r i d ced a r job T h c a Direct to e labor Applied to each job using a predetermined rate The Job 3-8 Sequence of Events in a Job-Order Costing System Receive orders from customers Schedule jobs Begin production Order materials Sequence of Events in a Job-Order Costing System Direct Materials Job No. 1 Direct Labor Manufacturing Overhead Job No. 2 Job No. 3 Charge direct material and direct labor costs to each job as work is performed. 3-9 Sequence of Events in a Job-Order Costing System Direct Materials Job No. 1 Direct Labor Manufacturing Overhead Job No. 2 Job No. 3 Manufacturing Overhead, including indirect materials and indirect labor, are allocated to all jobs rather than directly traced to each job. Job-Order Cost Accounting The primary document for tracking the costs associated with a given job is the job cost sheet. Let’s investigate 3-10 The Job Cost Sheet PearCo Job Cost Sheet Job Number A - 143 Department B3 Item Wooden cargo crate Date Initiated 3-4-05 Date Completed Units Completed Direct Materials Direct Labor Manufacturing Overhead Req. No. Amount Ticket Hours Amount Hours Rate Amount Cost Summary Direct Materials Direct Labor Manufacturing Overhead Total Cost Unit Product Cost Date Units Shipped Number Balance Measuring Direct Materials Cost Will E. Delite 3-11 Measuring Direct Materials Cost Measuring Direct Labor Costs 3-12 Job-Order Cost Accounting Why Use an Allocation Base? Manufacturing overhead is applied to jobs that are in process. An allocation base, such as direct labor hours, direct labor dollars, or machine hours, is used to assign manufacturing overhead to individual jobs. We use an allocation base because: 1. It is impossible or difficult to trace overhead costs to particular jobs. 2. Manufacturing overhead consists of many different items ranging from the grease used in machines to production manager’s salary. 3. Many types of manufacturing overhead costs are fixed even though output fluctuates during the period. 3-13 Manufacturing Overhead Application The predetermined overhead rate (POHR) used to apply overhead to jobs is determined before the period begins. POHR = Estimated total manufacturing overhead cost for the coming period Estimated total units in the allocation base for the coming period Ideally, the allocation base is a cost driver that causes overhead. The Need for a POHR Using a predetermined rate makes it possible to estimate total job costs sooner. $ Actual overhead for the period is not known until the end of the period. 3-14 Application of Manufacturing Overhead Based on estimates, and determined before the period begins. Overhead applied = POHR × Actual activity Actual amount of the allocation based upon the actual level of activity. Overhead Application Rate POHR = POHR = Estimated total manufacturing overhead cost for the coming period Estimated total units in the allocation base for the coming period $640,000 160,000 direct labor hours (DLH) POHR = $4.00 per DLH For each direct labor hour worked on a particular job, $4.00 of factory overhead will be applied to that job. 3-15 Job-Order Cost Accounting Job-Order Cost Accounting 3-16 Quick Check ü Job WR53 at NW Fab, Inc. required $200 of direct materials and 10 direct labor hours at $15 per hour. Estimated total overhead for the year was $760,000 and estimated direct labor hours were 20,000. What would be recorded as the cost of job WR53? a. $200. b. $350. c. $380. d. $730. POHR Direct materials Direct labor MOH Total cost Job-Order Costing Document Flow Summary Let’s summarize the document flow in a job-order costing system. 3-17 Job-Order Costing Document Flow Summary A sales order is the basis of issuing a production order. A production order initiates work on a job. Job-Order Costing Document Flow Summary Materials used may be either direct or indirect. Direct materials Job Cost Sheets Materials Requisition Indirect materials Manufacturing Overhead Account 3-18 Job-Order Costing Document Flow Summary An employee’s time may be either direct or indirect. Direct Labor Job Cost Sheets Employee Time Ticket Indirect Labor Manufacturing Overhead Account Job-Order Costing Document Flow Summary Employee Time Ticket Other Actual OH Charges Materials Requisition Indirect Labor Manufacturing Applied Overhead Overhead Account Indirect Material Job Cost Sheets 3-19 Job-Order Costing – Typical Accounting Entries Let’s look at summary journal entries for a joborder costing system. Cost Flows – Material Purchases Raw material purchases are recorded in an inventory account. 3-20 Cost Flows – Material Usage Direct materials issued to a job increase Work in Process and decrease Raw Materials. Indirect materials used are charged to Manufacturing Overhead and also decrease Raw Materials. The Purchase and Issue of Raw Materials Raw Materials Material lDirect Purchases Materials lIndirect Materials l Mfg. Overhead Actual Applied lIndirect Materials Work in Process (Job Cost Sheet) lDirect Materials 3-21 Job-Order Costing – Typical Accounting Entries Next let’s add labor costs and applied manufacturing overhead. The Recording of Labor Costs The cost of direct labor incurred increases Work in Process and the cost of indirect labor increases Manufacturing Overhead. 3-22 The Recording of Labor Costs Salaries and Wages Payable Direct Labor lIndirect Labor l Work in Process (Job Cost Sheet) lDirect Materials lDirect Labor Mfg. Overhead Actual Applied lIndirect Materials lIndirect Labor Recording Actual Manufacturing Overhead In addition to indirect materials and indirect labor, other manufacturing overhead costs are charged to the Manufacturing Overhead account as they are incurred. 3-23 Recording Actual Manufacturing Overhead Salaries and Wages Payable Direct Labor lIndirect Labor l Work in Process (Job Cost Sheet) lDirect Materials lDirect Labor Mfg. Overhead Actual Applied Indirect Materials lIndirect Labor lOther Overhead l Applying Manufacturing Overhead Work in Process is increased when Manufacturing Overhead is applied to jobs. 3-24 Applying Manufacturing Overhead Salaries and Wages Payable Direct Labor lIndirect Labor l Mfg. Overhead Actual Applied Indirect Materials lOverhead lIndirect Applied to Labor Work in lOther Process Overhead l Work in Process (Job Cost Sheet) lDirect Materials lDirect Labor lOverhead Applied If actual and applied manufacturing overhead are not equal, a year-end adjustment is required. Accounting for Nonmanufacturing Cost Nonmanufacturing costs are not assigned to individual jobs; rather they are expensed in the period incurred. Examples: 1. Salary expense of employees who work in a marketing, selling, or administrative capacity. 2. Advertising expenses are expensed in the period incurred. 3-25 Accounting for Nonmanufacturing Cost Nonmanufacturing costs (period expenses) are charged to expense as they are incurred. Job-Order Costing – Typical Accounting Entries Now let’s complete the goods and sell them. Still with me? 3-26 Transferring Completed Units As jobs are completed, the Cost of Goods Manufactured is transferred to Finished Goods from Work in Process. Transferring Completed Units Work in Process (Job Cost Sheet) Direct Materials lDirect Labor lOverhead Applied l Cost of Goods Mfd. l Finished Goods Cost of Goods Mfd. l 3-27 Transferring Units Sold When finished goods are sold, two entries are required: (1) to record the sale, and (2) to record COGS and reduce Finished Goods. Transferring Units Sold Work in Process (Job Cost Sheet) Direct Materials lDirect Labor lOverhead Applied l Cost of Goods Mfd. l Finished Goods Cost of Goods Mfd. l Cost of Goods Sold Cost of Goods Sold l Cost of Goods Sold l 3-28 Job-Order Costing – Typical Accounting Entries Let’s return to PearCo and see what we will do if actual and applied overhead are not equal. Problems of Overhead Application The difference between the overhead cost applied to Work in Process and the actual overhead costs of a period is referred to as either underapplied or overapplied overhead. Underapplied overhead exists when the amount of overhead applied to jobs during the period using the predetermined overhead rate is less than the total amount of overhead actually incurred during the period. Overapplied overhead exists when the amount of overhead applied to jobs during the period using the predetermined overhead rate is greater than the total amount of overhead actually incurred during the period. 3-29 Overhead Application Example PearCo’s actual overhead for the year was $650,000 with a total of 170,000 direct labor hours worked on jobs. How much total overhead was applied to PearCo’s jobs during the year? Use PearCo’s predetermined overhead rate of $4.00 per direct labor hour. Overhead Applied During the Period Applied Overhead = POHR × Actual Direct Labor Hours Applied Overhead = $4.00 per DLH × 170,000 DLH = $680,000 Overhead Application Example PearCo’s actual overhead for the year was $650,000 with a total of 170,000 direct labor hours worked on jobs. PearCo has overapplied overhead for the year jobs during the year? Use PearCo’s by $30,000. What will predetermined overhead rate of $4.00 per direct PearCo do? How much total overhead was applied to PearCo’s labor hour. Overhead Applied During the Period Applied Overhead = POHR × Actual Direct Labor Hours Applied Overhead = $4.00 per DLH × 170,000 DLH = $680,000 3-30 Quick Check ü Tiger, Inc. had actual manufacturing overhead costs of $1,210,000 and a predetermined overhead rate of $4.00 per machine hour. Tiger, Inc. worked 290,000 machine hours during the period. Tiger’s manufacturing overhead is a. $50,000 overapplied. b. $50,000 underapplied. c. $60,000 overapplied. Overhead Applied Underapplied Overhead d. $60,000 underapplied. Disposition of Under- or Overapplied Overhead PearCo’s Method $30,000 may be allocated to these accounts. $30,000 may be closed directly to cost of goods sold. OR Work in Process Finished Goods Cost of Goods Sold McGraw-Hill/Irwin Cost of Goods Sold Copyright © 2008, The McGraw-Hill Companies, Inc. 3-31 Disposition of Under- or Overapplied Overhead PearCo’s Cost of Goods Sold PearCo’s Mfg. Overhead Actual Overhead overhead applied costs to jobs Unadjusted Balance $30,000 $650,000 $680,000 $30,000 Adjusted Balance Allocating Under- or Overapplied Overhead Between Accounts We would complete the following allocation of $30,000 overapplied overhead: Work in process Finished Goods Cost of Goods Sold Total Amount $ 68,000 204,000 408,000 $ 680,000 Percent of Total 100% Allocation of $30,000 $ - 3-32 Allocating Under- or Overapplied Overhead Between Accounts Work in process Finished Goods Cost of Goods Sold Total Amount $ 68,000 204,000 408,000 $ 680,000 Percent of Total 10% 30% 60% 100% Allocation of $30,000 $ 3,000 9,000 18,000 $ 30,000 Quick Check ü What effect will the overapplied overhead have on PearCo’s cost of goods sold? a. Cost of goods sold will increase. b. Cost of goods sold will be unaffected. c. Cost of goods sold will decrease. 3-33 Quick Check ü What effect will the overapplied overhead have on PearCo’s net operating income? a. Net operating income will increase. b. Net operating income will be unaffected. c. Net operating income will decrease. Overapplied and Underapplied Manufacturing Overhead – Summary – Self-study PearCo’s Method If Manufacturing Overhead is . . . UNDERAPPLIED Alternative 1 Close to Cost of Goods Sold Alternative 2 INCREASE Cost of Goods Sold INCREASE Work in Process Finished Goods Cost of Goods Sold DECREASE Cost of Goods Sold DECREASE Work in Process Finished Goods Cost of Goods Sold (Applied OH is less than actual OH) OVERAPPLIED (Applied OH is greater than actual OH) Allocation 3-34 Multiple Predetermined Overhead Rates To this point, we have assumed that there is a single predetermined overhead rate called a plantwide overhead rate. Large companies often use multiple predetermined overhead rates. May be more complex but . . . May be more accurate because it reflects differences across departments. Job-Order Costing in Service Companies Job-order costing is used in many different types of service companies. 3-35 Job-Order Costing Let’s view Joborder costing in Standard cost system Standard Cost System § Standard cost § Predetermined norms (or standards) for materials, labor, and overhead § Compare actual costs to standard costs - difference is a variance 3-36 Job-Order Costing Let’s practice an example Questions Thompson Corporation started to produce and sell a new product using a job order costing system. The transactions occurred during the month of June as follows: a. Purchased materials on account for $60,000. b. Requisitioned direct materials totaling $52,000 for the use in production. Of the total, $22,000 was for the job 612; $18,000 for the job 613 and the remainder for job 614. c. Incurred direct labor for the month $72,000 with an average wage of $20 per hour. Job 612 used 1,600 hours, job 613 used 1,200 hours and job 614 used 800 hours. d. Incurred and paid actual overhead of $35,000 (credit to the various payables account) 3-37 Questions e. Charged overhead to each job at the rate of $10 per direct labor hour f. Completed and transferred Job 612 and 613 to finished goods. g. Sold job 612 on account for a price of cost plus 40%. Required: Prepare the journal entries for transactions a. through g. Questions 3-38 Questions Questions § What is the difference between job order and process costing systems? § How do actual, normal, and standard costing valuation methods differ? § How is the job order cost sheet used? 3-39 Homework Garrison et al., edition 16 § E3.10 § Problem 3.15
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )