Reinforced Concrete Design
Tutorial 1: Action and Action Combinations
1. Figure 1(b) shows part of a floor plan for a typical office building [as shown in Figure 1(a)].
Estimate the permanent and variable actions onto:
(a) Slab S1
(b) Beams B1, B3 and B23
(c) Column C6 (for one floor only)
For the purpose of load taking only, assume that the slabs and beams are simply-supported
except the cantilever beams which are continuous over the respective supports. Structural
elements are made of reinforced concrete of which
i. slab is of 125 mm thick
ii. beams are 300 mm width and has an overall depth of 500 mm
iii. columns are 300 x 300 mm
Basic action data are given as follows:
Variable actions
Office (general use)
Corridor
Stationery store (maximum
storage height is 2,2 m)
2,5 kN/m2
4,0 kN/m2
4,0 kN/m3
Weight of materials
Reinforced concrete
25 kN/m3
Floor screeding (13 mm thick)
0,30 kN/m2
Brickwork per 25 mm thick
0,54 kN/m2
Wall plaster (12 mm thick)
0,25 kN/m2
Armoured plate glass (13 mm thick) 0,32 kN/m2
230
1100
Figure 1(a) Architectural Floor Plan
Figure 1(b) Structural Floor Plan
Assume brick wall thickness (without plaster) = length of brick
Length of brick
Width of brick
Height of brick
230mm
115mm
75mm