Page 1 TURN – AROUND PROGRAMME Your Title 1. Hydrological Study Reassessment and improvement (Further Explained) Not recommended since diversion will affect future planned projects HYDROLOGICAL CONFIRMATION STUDY State Boundary Study on the existing flow availability Sufficient Flow Possible River Diversion Assessment Area Insufficient Flow Low Focus on EM Rehabilitation, lowering auxilairy load/losses, or increasing capacity High Focus on increasing catchment area and increasing flow by diverting other rivers into Sg. Kerling (RPSB)’s catchment © 2021 WHB. All Rights Reserved. Private & Confidential.