Canary Wharf Crossrail, London
Station, retail units and public park
Project information
Introduction
Completion date:
May 2015
Building type:
Station, retail units
and public park
Location:
Canary Wharf, London
Client:
Canary Wharf Group PLC
Design architect:
Foster + Partners
Executive architect
Adamson Associates
Crossrail is the largest transport project in
Europe, connecting London from east to west
with nine new stations and 42 kilometres of
new tunnels under the city. While the Canary
Wharf Crossrail Station will be operational only
in 2018, the overground structure, including
four levels of retail and a landscaped roof park
has been open to the public since May this
year. As part of a collaborative design project,
Foster + Partners designed the roof and
external facades of the overground structure,
including the retail facades. The structure is
unified by a timber diagrid roof which curves
around the building like a protective shell.
At 310 metres long, with dramatic arches
cantilevering 30 metres over water at each
end, it is one of the longest continuous timber
roofs in the world.
Structural engineer: Arup
Structural engineer
(glulam):
Weihag
Main contractor:
Canary Wharf Contractors
Glulam supplier
and manufacturer:
Weihag
EFTE cushion
manufacturer:
se-austria
Timber elements:
Diagrid structure
Timber species:
FSC®-certified spruce
Awards:
2015 London
Construction Awards,
London Building
Excellence Award
Structural Award Winner,
Wood Awards 2015
Blueprint Awards shortlist
2015
Case Study | Crossrail Canary Wharf, London
The glass and steel office towers of Canary
Wharf stand amidst docks and waterways
where sailing ships once unloaded their
cargoes. The timber roof is clad with
translucent ETFE cushions, acting as a
counterpoint to the steel and glass towers of
the offices nearby.
technique was developed by Arup to form the
perimeter walls and a concrete superstructure
was then built to house the station level
and four higher levels of retail units with a
public landscaped park on the top floor. The
Crossrail station lies below the water level and
only two floors of retail and the public park
are now visible, linked to the dock edges by
bridges. The retail floors, just opened, include
shops, cafés, cinema, health centre and other
amenities, and have built-in flexibility, with
double-height entrances, to accommodate
changing needs.
The diagrid roof, clad with translucent air-filled
ETFE (ethylene tetrafluoroethylene) cushions,
arches over the landscaped park and curves
downward at the sides to partly enclose the
retail levels. When open at night, the park will
be lit, illuminating the timber lattice from below
and creating a welcoming glow through its
translucent ETFE outer skin.
Studies showed that the only suitable position
for the station building was in the waters
of the north dock. Before work started on
the building, the dock had to be drained of
100,000 cubic metres of water and excavated
30 metres below dock bed level to cast the
Crossrail track bed. An innovative piling
1
Canary Wharf Crossrail, London
Station, retail units and public park
Elevation of Canary Wharf Crossrail
Long section through Canary Wharf Crossrail
Site plan and roof plan of Canary Wharf Crossrail
Case Study | Crossrail Canary Wharf, London
2
Canary Wharf Crossrail, London
Station, retail units and public park
Cross section through Canary Wharf Crossrail and dock
2
3
1
3
4
4
4
4
7
5
6
5
8
Key
1.
Glulam diagrid roof with ETFE cushions
2.
Landscaped roof park
3.
Bridge
4.
Retail level
5.
Dock water level
6.
Dock bed level
7.
Crossrail station
8.
Crossrail track level
Case Study | Crossrail Canary Wharf, London
3
Canary Wharf Crossrail, London
Station, retail units and public park
The rooftop park paths meander through
4,000 square metres of landscaped gardens,
including full-sized trees, with publicly
accessible amenities at each end. Along the
upper parts of the diagrid, the ETFE cushions
have been omitted to leave openings for
natural light and rain for natural irrigation.
This helps to create a unique microclimate
for the park below, allowing the gardens to
be planted with some of the species that
first entered Britain through the same docks.
Additional openings along the sides and at
the ends of the diagrid give views of the water
and surrounding streets.
A diagrid roof of glulam beams arches over the landscaped park.
Timber was the natural choice for the diagrid
structure, not only for its traditional relationship
to the nautical history of the wharf but also for
its combination of strength and adaptability.
The use of timber helped to fulfill the client’s
requirement for a sustainable building; the
spruce glulam beams are sustainably sourced.
Above all, timber could be economically and
efficiently machined to follow the complex
geometry of the curving forms.
The glulam grid shell roof is lighter than an
equivalent steel structure and the ETFE roof
weighs a fraction of a glass alternative, so
design of the main steel and concrete structure
below benefited from the reduced weight.
Because of the size of the roof and its
complexity, the two fabricators - the glulam
specialist Wiehag, and the EFTE cladding
manufacturer se-austria - worked together
from the start of the project to tender the roof
as a single package.
Case Study | Crossrail Canary Wharf, London
The ends of six glulam beams meet at each steel node.
4
Canary Wharf Crossrail, London
Station, retail units and public park
At first sight the geometry of the diagrid
appears simple, but it is a simplicity
achieved by rigorous analysis of the complex
structural form and the constraints of the
materials used. Foster+Partners used a
parametric modelling system to define the
overall geometry and the fabricators adopted
the same approach to co-ordinate design
and detailing and to integrate both glulam
beams and ETFE cladding systems.
The diagrid is a series of triangles formed of
glulam beams connected by steel nodes; the
ends of six beams meet at each node. Over
the central section of the roof, the relationship
between node and beam end is similar, but
as the triangles gradually increase in size
towards the arched cantilevers, the beams
become longer and the angles at which they
connect to the nodes become more acute
and asymmetric. The design of each node
varies according to the angle. To add to the
complexity, the open parts of the roof directly
over the planting have larger diamond-shaped
openings which meant that two, three, four,
five or six beams connect at nodes. Because
the nodes are all designed as a family, all the
variations are designed within the system,
resulting in over 300 different node types.
The structural analysis of the diagrid was
challenging, explains Clemens Huber of
Wiehag: ‘For this structure with multiple
degrees of indeterminacy, the stiffness of
each element, especially of connection
elements, influenced how the loads were
distributed. If the stiffness is increased at
one location, it attracts higher forces and
simultaneously neighbouring areas will see
reduced forces. The stiffer an element is,
the more load it attracts and the more the
connection element has to be reinforced. It is
a dynamic process to reach a resolved model
where everything is in balance with the right
stiffness determined at each point, a process
demanding many iterative loops.
There are over 300 different node types.
Diagrid elements are lifted into position on site.
For the timber screws that connect the timber
beams to the steel nodes, determining stiffness
parameters was an equally exacting process.
The screw plates are loaded in all directions. In
addition to the major axial forces (tension and
compression), there are bending moments in
all directions in major and minor axes and also
torsion moments and shear in all directions.
The timber has to support the forces created
by the ETFE cushions, which create horizontal
forces due to internal pressure. Furthermore, if
a timber supports only one cushion, the offset
horizontal loads generate torsion moments in
the timber beams. The stiffness of the bearing
structure also has an influence on the design of
the roof element’1
1 Balancing Complexity and Simplicity Jonathan Rabagliati
(Foster + Partners, London), Clemens Huber (Wiehag, Austria),
Dieter Linke (se-austria [Seele]), in FABRICATE 2014 Publication:
Negotiating Design & Making, Edited by Fabio Gramazio,
Matthias Kohler & Silke Langenberg, Published by gta Verlag.
Case Study | Crossrail Canary Wharf, London
The 310 metre long diagrid is almost complete.
5
Canary Wharf Crossrail, London
Station, retail units and public park
Perspective of diagrid at node and ETFE cushion connection
1
5
2
3
6
7
9
11
10
Detail section at node and ETFE cushion
Key
4 2
3
1
7
5
8
9
10
Case Study | Crossrail Canary Wharf, London
1.
ETFE cushion
2.
Adonised aluminium cover extrusion
3.
Adonised aluminium base extrusion
4.
Condensation drip catch
5.
Primary air pipe
6.
Support bracket
7.
Air pipe to cushion
8.
Electric services
9.
Glulam diagrid beam
10.
Galvanised steel node
11.
Galvanised steel end plate
6
Canary Wharf Crossrail, London
Station, retail units and public park
The diagrid roof cantilevers 30 metres over the water at each end.
The total number of timber elements is close
to 1500 and each end meets a connecting
node. For each of these 3000 connections,
twelve different load combinations had to be
considered. The structure was analysed and
designed using structural analysis software
Rstab plus Excel. This process was linked
to the Weihag factory in northern Austria.
The final output included everything from
timber quality, strength and dimensions
to how and when it was to be transported
to site. At the Weihag factory the glulam
beams were planed, glued and pressed in
a fully automated process. A five-axis CNC
(computer numerical control) robot was used
to cut the beams to length and to machine
holes and grooves as required. Four of the
beams were curved and their curvature
was also digitally controlled. Where they are
exposed to the weather, the glulam beams
are protected with anodised aluminium sheet
cladding.
aluminium extrusions to a series of support
brackets (incorporating the air flow pipes)
which are fixed above the glulam beams.
se-austria designed and tested new cover
gaskets and cover plates for the extrusions to
ensure that they would be water-tight whatever
the orientation. The computational process
was also applied to the process of fabrication
of extrusions, brackets and ETFE cushions.
Sustainability
All timber is PEFC-certified. The waste timber
is used to heat Wiehag’s power station at the
Altheim factory, making it self-sufficient for
heat and electricity.
At the end of its life the glulam structure can be
easily and safely dis-assembled and recycled
or the timber can be made into bio-fuel.
The inflated EFTE cushions which clad the
roof triangles vary in size to match the diagrid
members and at the cantilevered ends of the
building they are over 7.3m - the maximum
width possible given the forces exerted on the
cushion (wind, snow and potential pounding
etc.) The cushion edges are secured by
Case Study | Crossrail Canary Wharf, London
7
Canary Wharf Crossrail, London
Station, retail units and public park
BM TRADA
part of the
Exova Group
Stocking Lane
Hughenden Valley
High Wycombe
Buckinghamshire
HP14 4ND (UK)
t: +44 (0)1494 569600
f: +44 (0)1494 565487
e: information@trada.co.uk
w: www.trada.co.uk
Photography: © Nigel Young Foster+Partners
Drawings:
© Foster+Partners
Case Study | Crossrail Canary Wharf, London
© TRADA Technology Ltd 2015