Business Planning
Understanding SAP Business
Planning & Consolidations
Tips, Tricks & Lessons Learned
10/21/13
© TruQua. All Rights Reserved. CONFIDENTIAL
Topics we’ll cover
• Understand common Planning Goals
• Get Insight into the Business Planning and Consolidation Solution.
• Learn how to determine the sequence of installation, upgrade, or
integration steps for SAP Business Planning and Consolidation while
taking into account your existing SAP environment
• Understand upgrade and implementation alternatives for a stand-alone
deployment, an add-on approach, and support pack options
• Get tips for migrating from the 7.0 and 7.5 releases to 10.0, including
what areas will require the most effort — such as transitioning your data
• Get advice on how to strategically phase out unsupported, or unneeded,
solutions
• Get details on the SAP HANA migration path from SAP NetWeaver BW
and SAP NetWeaver BW Accelerator and how it compares to a traditional
database migration effort
10/21/13
© TruQua. All Rights Reserved. CONFIDENTIAL
Page 2
Agenda
• The Planning Process
• Benefits of a Business Planning Solution
• BPC, an Overview
• The EPM Add-In
• Understanding the BPC Architecture
• Installing / Upgrading BPC
• Leading a successful BPC Implementation
• Demo – A Sales Planning Solution
• Wrap Up
10/21/13
© TruQua. All Rights Reserved. CONFIDENTIAL
Page 3
Planning & Consolidation Goals
• Align financial and operational plans with strategic
objectives and goals
• Improve planning accuracy and associated costs
• Reduce budget cycle time
• Spend more time on analysis and less time on
transactional work
• Quickly model potential business strategies and
decide on a course of action that maximizes value
creation
• Have confidence in financial results and reports
10/21/13
© TruQua. All Rights Reserved. CONFIDENTIAL
Page 4
Top Pressures Year Over Year
Market volatility creates the need to
dynamically account for change ('agility')
47%
39%
37%
Need to better align Planning/
Budgeting with corporate goals
41%
29%
2010
34%
32%
34%
Corporate mandates for cost control
2009
2008
22%
25%
Current/past accuracy of the budget
negatively impacts corporate performance
42%
Current processes are too long &
21%
24%
resource intensive
34%
0%
10%
20%
30%
40%
50%
Percentage of Respondents
10/21/13
© TruQua. All Rights Reserved. CONFIDENTIAL
Page 5
The Essential Ingredients of
Financial Excellence
Financial excellence
– Financial excellence is achieved when resources, people, and technology are
combined to optimize and streamline processes, decrease operating costs, manage
business performance, and avoid certain risks
• Gaining efficiency in Finance
• Optimize working capital
• Driving strategy and growth
• Managing risk and compliance
Financial close
– A streamlined, efficient, and high-quality financial close is a key ingredient of financial
excellence
– Initial wave during the late 1990s
– Now re-emerging due to close times slowing in recent years
• Processes were not industrialized
• Underestimated the impact of SOX
10/21/13
© TruQua. All Rights Reserved. CONFIDENTIAL
Page 6
The Average Company…
Uses
25K person days per
$bn revenue for
performance
measurement
Takes 95 days to
complete a budget
Budgets 230 line
items
Takes 4.5 months to
develop a financial
plan
Takes 21 days to
complete a forecast
Source: “AnswerThink Consulting/The Hackett Group”: www.sterlinghoffman.com/
newsletter/articles/article300.html
10/21/13
© TruQua. All Rights Reserved. CONFIDENTIAL
Page 7
Today’s Challenges
The dynamic regulatory landscape
– IFRS
– EU Accounts Modernization Directive
– Sarbanes-Oxley Act (SOX)
Requirement for faster reporting
– Section 409 of SOX for material events
– Accelerated SEC 10K/10Q filing deadlines
Need for greater accuracy
– Section 302 of SOX management certification
– Section 404 of SOX audited reporting of
internal controls
SOX-related close and audit takes longer
– 52% of the 100 largest US corporations added an average of 5 days to close times
over last 5 years
– 71% of companies surveyed added an average of 19 days to their audit sign-off
period over the last 5 years
10/21/13
© TruQua. All Rights Reserved. CONFIDENTIAL
Page 8
Common Problems
Data – Accuracy and predictability
• Historical data in multiple systems
and spreadsheets — No central, data
store
Process – Efficiency and standards
• No linkage and enforcement with
standard business processes
• Budgeting process takes too long and
is error prone
Execution – Usability and adaptability
• Existing planning products are
difficult to use and inflexible —
Designed for power users
• Too much dependency on IT for
business-specific tasks
10/21/13
© TruQua. All Rights Reserved. CONFIDENTIAL
Source: CFO.com (2008): A complete view of the
enterprise: linking operational and financial
planning in global organizations
Page 9
Trend: Strategic Actions of Best-in-Class
Planning for the Year
2010
2009
Develop a formal planning/budgeting/
forecasting workflow process
47%
40%
Automate the process flows associated
with the budget process
41%
20%
Involve more decision-makers in the
planning/budgeting/forecasting process
38%
40%
19%
Improve data quality
52%
Develop a consolidated view of the process
and the results to be available on demand
19%
28%
0%
10%
20%
30%
40%
50%
60%
Percentage of Respondents
10/21/13
© TruQua. All Rights Reserved. CONFIDENTIAL
Page 10
Agenda
• The Planning Process
• Benefits of a Business Planning Solution
• BPC, an Overview
• The EPM Add-In
• Understanding the BPC Architecture
• Installing / Upgrading BPC
• Leading a successful BPC Implementation
• Demo – A Sales Planning Solution
• Wrap Up
10/21/13
© TruQua. All Rights Reserved. CONFIDENTIAL
Page 11
Benefits of an Agile Planning
Solution
Firms enjoying best-in-class performance share
several common characteristics
•
100% of best-in-class companies have
invested in planning, budgeting, and
forecasting applications
•
72% of best-in-class companies have the
ability to reforecast as market conditions
change
•
92% of best-in-class companies have
established enterprise-wide collaboration from
the top-down and across departments/
divisions during the planning process
•
70% of best-in-class companies have the
visibility that allows them to drill down to
successive level of detail and 60% have the
ability to perform multi-dimensional roll-ups
“ Anticipated ROI of 50% to
150%, and 6- to 12-month
payback.
Can reduce the duration of
the planning cycle by 30%
to 90%, and reduce the cost
by 25% to 75%.”
Source: 2009 Gartner-Financial Executives
International Technology Survey
Source: Financial Planning, Budge4ng, and Forecas4ng -­‐ Managing in Uncertain Economic Times. Aberdeen Group. January 2009 10/21/13
© TruQua. All Rights Reserved. CONFIDENTIAL
Page 12
Benefits of a Fast, High-Quality
Financial Close
Benefits Derived from Cycle Time Reduction
7%
8%
The benefits of a fast
close
•
Improved control systems and
processes at lower cost
•
Greater quality and greater efficiency
•
Faster access to financial information
for decision making
•
More time for value-add financial
analysis
•
Ability to respond to management
requests and support key initiatives
•
Marketing tool
•
Work-life balance for accounting
13%
62%
10%
Redeployment of staff and resources towards
more value-added activities
Ability to meet regulators’ deadlines
I do not see any value in cycle time reduction
Be able to work fewer hours, less late nights
and weekends
Cost reduction
Source: Business Objects (now SAP) Fast Close Survey. BPM Magazine. May 2006
10/21/13
© TruQua. All Rights Reserved. CONFIDENTIAL
Page 13
Percentage of Respondents, n = 171
Dynamic Planning Capabilities
Best-in-Class
80%
Industry Average
66%
60%
40%
Laggard
61%
59%
52%
40%
38%
32%
27%
20%
20%
0%
Ability to reforecast
as market conditions
change
Ability to perform
“what-if” scenarios
and change analysis
Ability to incorporate
business drivers into
the on-going forecasting
process
Source: “How Best-in-Class Companies Plan, Budget and Forecast in Today’s Dynamic World”, Aberdeen
Group, 2010
Cost of Planning
Cost as a
percent of
revenue
Source: The Hackett Group
Critical Differences
Laggards (34%)
Periodic Reactive Review
Based on Line of Business
Against Plan
Standard Costing with Limited Information
on CrossFunctional Business
and Financial Impacts
Spreadsheet and Use of Lineby-Line Analysis of Actual
vs. Plan
Separate Metrics for Each
Functional Area
Industry Norm (54%)
Best-In-Class (12%)
Processes
Closed-Loop Root Cause
Analysis Across the
Value Chain
Knowledge
Detailed Information on
Profitability and Cost of Key
Customers, Products,
and Channels
Technology
Leverage Root Cause
Analysis and Simulation
Tools to Augment
Traditional Systems
Metrics
Integrated Set of Metrics
That Are Internally and
Externally Focused in a True
Balanced Scorecard
Source: “The Corporate Performance Management Benchmark Report” Stanley Elbaum, Aberdeen Group, 2004
What’s a Fast Close?
How fast is fast?
– The average time to report year-end or
fourth-quarter results in 2007/2008 was:
•
•
29 days in the United States
50 days in Europe
– Over the last five years, the close got
generally faster in Europe yet slower in the United States
• Impact of SOX
– Times for internal management reporting are broadly similar
Upper Quartile
Middle Quartiles
Lower Quartile
Best
Worst
Europe
<8
9-15
>16
2
55
United States
<7
8-14
>15
1
22
Source: BPMi Global Close Cycle Rankings 2008
The Role of Technology
• Data entry and validation
–
–
Intelligent checks and filtering
Consistent, complete, and
commented
• High performance
–
Simultaneous, parallel processing
–
Must not compromise on audit trail
• Process automation
–
–
–
Built-in rules logic to automate
entries
Multiple reporting channels
Retain past frameworks
• Ease of use
–
–
Web and Microsoft Office
Workflow and process monitoring
–
Owned and managed by business
users
Source: Jens Koerner
Agenda
• The Planning Process
• Benefits of a Business Planning Solution
• BPC, an Overview
• The EPM Add-In
• Understanding the BPC Architecture
• Installing / Upgrading BPC
• Leading a successful BPC Implementation
• Demo – A Sales Planning Solution
• Wrap Up
10/21/13
© TruQua. All Rights Reserved. CONFIDENTIAL
Page 19
Business analytics solutions from SAP
Our approach
Data Sources
Analytic Capabilities
Analytic
Applications
Enterprise
Performance
Management
Business
Intelligence
Collaboration
Enterprise
Information
Management
Governance,
Risk, and
Compliance
Data
Warehousing
Source: SAP
Services and Best Practices
Access
Our solutions for enterprise performance
management for finance
Align better
Drive consistent execution of strategy
Ensure everybody is on the same page by linking
goals, metrics, and plans throughout the
organization
Strategize
& Prioritize
Adapt better
Increase organizational agility
Be prepared and able to rapidly adjust plans and
realign resources to seize opportunities or mitigate
risks
Model &
Optimize
Strategy Management
Planning, Budgeting, and
Forecasting
Profitability and Cost
Management
Financial Consolidation
Disclosure Management
Operate better
Improve profitability and efficiency
Make informed decisions that drive the bottom line
and reduce the time and cost of regulatory
compliance
Solution today
Source: SAP
Monitor
& Analyze
Plan &
Execute
What do most companies use today?
Source: SAP
Introducing Business Planning and
Consolidations
Planning, budgeting, forecasting, and financial consolidation in one application
Business planning
• Budgeting
• Sales/revenue planning
• Capital expenditure planning
• Headcount/staffing
• Expense planning
• Cash flow/liquidity planning
Forecasting and consensus building
• Rolling forecasts
• Continuous planning
• Collaboration
Consolidation
• Intercompany matching/
reconciliation
• Intercompany eliminations
• Management roll-ups
• Legal consolidation
Financial reporting and analysis
• Ad hoc
• Variance analysis
• Driver analysis (industry,
growth, capacity, etc.)
Source: SAP
SAP Business Planning and
Consolidation*
Streamlined planning and a faster, more compliant close
Familiar and easy to use
●
Increase user adoption with a solution that
leverages native Microsoft Office tools (e.g.,
Excel) and Web browsers
Process-centric
●
Guide users and drive process consistency
with configurable business process flows
Unified
●
Save time and reduce errors with a single,
integrated solution for planning and
consolidation
* Available in a version for the Microsoft platform and a version for
SAP NetWeaver®
Source: SAP
What’s Different This Time?
• In the past SAP has made attempts to adopt Microsoft Office as its
key frontend tool but in doing so has stifled the capabilities.
– i.e. Excel In-Place provided no capability to utilize any of the
special features that Excel has to offer.
• BPC has a unique approach to its integration with Microsoft Office
• Unlike previous SAP planning or consolidations tools that tried to
retrofit Excel into SAP, BPC uses the full features and functions of
Excel leveraging SAP. This enables end users to leverage the full
power of Microsoft Excel!
• BPC in essence is Excel ++
Understanding the different SAP Business
Planning and Consolidation releases
Version for SAP
NetWeaver
Version for the
Microsoft Platform
5.1
Release
2007
Acquired from
OutlookSoft
7.0
Release
7.0
Release
SAP Business Planning and Consolidation is
available as two distinct (separately priced)
applications/platforms – version for SAP NetWeaver
and version for the Microsoft platform
SAP is pursuing a dual release product strategy
1. SAP Business Planning and Consolidation 7.0, version for the
Microsoft platform succeeds the 5.1 release
2. SAP Business Planning and Consolidation 7.0, version for SAP
NetWeaver is a new product running on the SAP NetWeaver
platform (it is not a successor to the 5.1 release)
7.5
Release
7.5
Release
•
•
10.0
Release
2013
Generally Available
Source: SAP
10.0
Release
Generally Available
Version for the Microsoft platform requires Microsoft SQL
Server
Version for SAP NetWeaver supports any database
supported by underlying SAP NetWeaver platform
The 10.0 releases of both versions are currently in
unrestricted shipment (general availability)
Going forward, SAP is continuing to invest
in both versions
Similarities and differences between
versions
Similar functionality, but not identical
Concurrency
Locking
VERSION FOR SAP
NETWEAVER
User
Activity
Data
Manager
SAP NetWeaver BW
Accelerator (SAP HANA*)
support
SAP NetWeaver Authorizations
Dimension Management
VERSION FOR THE
MICROSOFT PLATFORM
SIMILAR CAPABILITIES
Shared Query Engine
Automated Variance
Microsoft Office Clients
Analysis
Web Reporting
Drag-and-drop report design
Microsoft SQL Server
Business Process Flows
Database Only
Granular Transports (Lifecycle
Workspace
Management)
URL Drill-through
SQL-Based Logic Script
BAdI Framework for
BI Platform Integration
Enhancements
Table DrillDocuments view
Through
Controls and Consolidation
Ownership Manager
Monitors
User Management
SSIS
Model Mgmt
Process Chains
Packages
Business Rules
Web-Based Admin
Active Directory
64-bit
support
Drag-and-drop hierarchy
Global Cache
Books
editing over the Web
Optimize Application
Source: SAP
Environment
Shell
Logic
Script
Audit
Reports
Agenda
• The Planning Process
• Benefits of a Business Planning Solution
• BPC, an Overview
• The EPM Add-In
• Understanding the BPC Architecture
• Installing / Upgrading BPC
• Leading a successful BPC Implementation
• Demo – A Sales Planning Solution
• Wrap Up
10/21/13
© TruQua. All Rights Reserved. CONFIDENTIAL
Page 28
Introduction to the EPM Add-In
• The EPM Add-In is the new frontend for EPM 10.0 products, but the tool is not
limited to usage within the EPM Suite. In fact it can be used for Excel Reporting
on a number of different solutions.
– Profitability and Cost Management
– SAP Strategy Management
– Business Planning and Consolidations
• NetWeaver
• Microsoft
– Any system with an ODBO connection.
• SAP BW
• Microsoft Analysis Services
• And more…
• In order to successfully implement BPC it is paramount to understand the rich
features available within the tool in order to effectively utilize the vast set of
capabilities that the application has to offer.
• Remember this is what the end user will see and the measure of success a
project has is based on ‘user adoption’.
The Connection Concept
EPM applications can be reached via several connection
types:
SAP BO EPM add-in 10.0
SSAS – SQL Server Analysis Services
BW – SAP Business Warehouse
ODBO – OLD DB for OLAP
XMLA – XML for Analysis
WS – Web Services
ODBO
SSAS, BW
cubes
SAP Financial
Consolidation 10.0
Designer cubes
SAP Profitability and
Cost Management 10.0
ODBO
SAP Strategy
Management 10.0
ODBO
WS
ODBO
SAP BusinessObjects Planning and
Consolidation, Version for NetWeaver
10.0
WS
SAP BusinessObjects Planning and
Consolidation, Version for Microsoft
10.0
+ Support of non EPM SSAS and BW cubes (through ODBO technology)
•
SAP BOPC 10 cubes for both Microsoft and NetWeaver versions can be queried from the EPM add-in
using two different kinds of connections:
§ Web Services
§ ODBO provider (a particular ODBO provider for each NW and MS version).
Creating EPM Connections
• Local:
–
–
This connection type is for ODBO
connections, which can be built for FC
SSAS cubes, FC BW cubes, SSAS standard
cubes, BW standard cubes, PCM ODBO
provider,
SSM ODBO provider, BPC MS ODBO
provider and SAP BW OLE DB provider.
An ODBO connection doesn’t allow data
input, and is only used for data retrieval.
Data Manager features are also not
reachable with an ODBO connection.
However, the usage of custom members
(to build some complex MDX calculated
members) can only be performed with an
ODBO connection.
• Planning & Consolidation:
–
–
This type is for Web Service connections,
on the top of BPC 10 MS and BPC 10 NW.
A Web service connection allows data
input, and the use of the Data Manager
ribbon, but does not support the creation
of custom members.
Creating EPM Connections
Manual Connections
Manually created connections are
always stored in the EPM – Connection
Manager window
•
Creating EPM Connections
Manual Connections
•
Creating EPM Connections
Automatic Connections
Automatically created connections, accessed from
the BPC web portal, are not stored in the EPM –
Connection Manager window.
EPM Add-In Jumpstart
Some EPM Add In Basics that are critical to understand in order to lead a successful
implementation.
• EPM Toolbar
• Context Bar
• EPM Pane
• Report Editor
• Building Input Forms and Reports
• Options (Report Editor vs Sheet Options vs User Options)
• Formatting
• Multi-source Reports
• Advanced Cell Formulas
• Member Recognition
EPM Toolbar
The EPM Add-in installs two toolbars, one for EPM reporting called EPM, and one for
batch data processing called Data Manager
EPM Context Bar
The Context Bar provides a view into the data that they are planning
against and provides a way to quickly change to different intersections
for planning and viewing data. The Context Bar acts much like single
selection user variables in BEx minus the ability to create user-exits on
those variables.
EPM Context Bar
By selecting the dropdown menu, the member selector appears. You will see
only members that you have authorizations to
EPM Context Bar
The Context Bar can be customized per worksheet using the Context
Options Menu
Dimensions can be hidden and/or
locked by worksheet or workbook
EPM Pane
The EPM Pane can be a quick way to build and/or edit reports. It is also
a great way once you understand the model you are working with to
perform ad-hoc
analysis of your
business data.
EPM Report Editor
The Report Editor has the most comprehensive set of features available
for building Input Forms and Reports vs. the EPM Pane and direct cell
entry
EPM Report Editor
The Report Editor has ten tabs where you can customize aspects of your report
such as read only members, report expansion behavior, formatting sheet,
creating local members, sorting, and filtering
These robust features
permits maximum
flexibility in reporting and
planning layouts.
Building reports and input forms
Once logged into the EPM data source, click the New Report button (1)
or drag & drop dimensions from the dimension list in the EPM Pane to
the row axis and columns axis (2).
2
1
Or
Building reports and input forms
Once your report is generated, you can access its options (tabs) by clicking the
Edit Report button (1). The Report Editor opens with a list of options and tabs (2).
2
1
3
By selecting Use as
Input Form option (3),
the Save Data button
will become available
(4), when coming back
to your report.
Building reports and input forms
Click on the Account dimension in row axis on the EPM Pane (1) in order to define
the desired expansion. The Member Selector opens and you can now define your
Account expansion.
1
4
Select PL600
account member
(2), and Member
and Descendants in
the Selection
Relationship dropdown (3), and move
it to the Selected
Members window,
by clicking the right
arrow button (4),
and click OK (5).
2
3
5
Building reports and input forms
You report now displays NetIncome and all its descendants for the
Account dimension.
•
EPM Options
The difference between Report Editor Options, Sheet Options, and User
Options
Ø Report Options are specific to a single report
Ø Sheet Options apply to all reports on the worksheet
Ø User options are specific by user and can create different user experiences for
the same input forms and report
Ø All options are documented in the EPM End User Guide
Ø Specific Option settings will be covered in the workbook design section as they
are specific to individual reports and workbooks
Formatting
For each report, you can decide to apply a formatting by clicking the View
Formats button on the EPM tab (1). A new sheet appears in your
workbook (called EPMFormattingSheet) (2).
1
2
Formatting
• Apply some formatting to the desired sections.
• Be aware of the priority (read from the top to the bottom).
Formatting
Return to Sheet1 worksheet and click the Edit Report button (1). Under
the Options tab click the Apply Dynamic Formatting checkbox and choose
EPMFormattingSheet in the drop-down box (2).
1
2
3
Back to your report,
the formatting is
applied (3)
according to the
EPMFormattingSheet
definition.
Multi-source reports
Using the EPM Add-in, you can display two reports belonging to different data
sources on the same worksheet.
Report 1 is linked to a Planning and
Consolidation connection.
1
Report 2 is linked to a native BW cube
through ODBO driver connection.
Note that the Active Connection drop-down
in the EPM Pane references all data sources
which you are simultaneously connected to.
And you can add new connections directly
from here choosing the Select Another
connection link:
2
Multi-source reports
When displaying several reports on the same spreadsheet, you can turn on the
Axis Sharing Feature.
Report 1 is linked to a
Planning and
Consolidation
connection, and
shares its row axis
with Report 2.
1
•
2
Report 2 is linked to
the same Planning
and Consolidation
connection, and
displays another
dimension in columns.
Advanced cell-based formulas
• Some EPM functions enable you to perform some actions on reports or input
forms. Those functions are complementary to the EPM Add-in interface, and
might allow your reports or input form to be even more dynamic.
• EPMCopyRange, very useful formula.
– This function enables you to add and repeat the content of a range of cells
until the bottom (columns) or the right side (rows) of a report is reached. The
range is added to the data grid and to the shift zones (if there are ones),
starting after the row axis and below the column axis.
– Typically, this function is very useful when you use hidden columns between
your row headers and your data range (what we call shifting columns).
– This function is not the official successor for Before Range/After Range. The
new method for building Before and After Range would be to either use the
Sorting & Grouping feature in the axis definition, or use the new
EPMInsertCellsBeforeAfterBlock directly in the report.
Advanced cell-based formulas
= EPMCopyRange("000",TRUE,A2:D2)
•
•
•
•
Here, the formula is used
to copy a formatting range
down the rows.
It is applied for the shift
column (column B), as
well as for the data grid.
The source definition of
the formats to apply is
placed in cells A2:D2,
above the report.
In cells A2:D2, you can
also add formulas to
retrieve comments instead
of data for example.
Advanced cell-based formulas
= EPMDimensionOverride("000;001",“TIME",B20)
ØEPMDimensionOverride formula offers the ability to reference former
MemberSet cell (from an EVDRE report), so that your expansion in EPM
Add-in will retrieve the same result. Former MemberSet parameters can
be used (MEMBERS, BAS,SELF,LDEP(n), etc…)
ØIn this example, the formula will override the member selection for the
TIME dimension in reports 000 and 001. The dimension member selection
performed in the Member Selector is replaced by value in cell B20.
Activating Member Recognition
Member Recognition is a key component in building more complicated reports
and driving report and column headers from your context
EPM Add-in client vs. Web client
EPM Add-in client
• Installed on client machine (no need to be aligned with BPC server SP)
• Supports advanced reporting and input form
Ø Easy drag & drop feature and axis selection
Ø Complex formatting
Ø Sorting, ranking, filtering, and spreading capabilities
Ø Advanced member selections, data offsets
Ø Member recognition
Ø Use of BPC VBA macros and advanced cell-based formulas
Ø Workbook supports multiple reports, input schedules and sources
Ø Report links for ad hoc analysis
• Can run data manager process chains and execute drill-through
• Ribbon customization
• Enhanced Word and PowerPoint integration
• Create Distribution and Book templates
EPM Add-in client vs. Web client
Web client
• Zero footprint and can work on client computers not running Microsoft Office
• Administrative and general navigation functions for BPC 10.0 NW
Ø Create models, business process flows and business rules,
Ø Manage documents, web content management and audit reports
Ø Design and leverage Consolidation Monitor
• Workspaces allow for web reports, schedules and dashboards to be easily
consumed by users
• Supports simple reporting and data input, to augment EPM Excel capabilities
Ø Can filter on members, sort fields, change layout and show charts
Ø Using Dashboard Designer 4.0 can allow for more complex scenarios using flash files
EPM Add-in client vs. Web client
Web client
Formulas
•
•
The dimension member formulas work with web client. Report specific formulas can’t be created on the web client. Excel client •
•
•
FormaTng
•
Web client does not have report formaTng features though it has func4onality to use chart and table with various op4ons for chart.
•
•
Excel formulas can be created and used. Formulas on summa4on, calcula4ons parent node values (instead of fetching values from backend) can be done. VB scrip4ng can be leveraged
Full array of report formaTng features are available. In addi4on, Excel formaTng features can also be leveraged.
Data Manager
•
Data Manager packages cannot be executed from the web client.
•
Data manager packages can be executed from the Excel client.
Drill-­‐Through •
Drill-­‐Through cannot be executed from the web client. •
Drill-­‐Through can be executed from the web client. EPM Add-in client vs. Web client
Web client
Addi4onal features
•
•
•
Excel client It is easier to integrate reports •
and input schedules with workspaces and library. Reports allow member selec4ons, •
sor4ng, drag and drop and charts. Favorites link
Excel client has addi4onal features such as enhanced member selector, direct member entry, member offset , spreading etc.
Integra4on
•
Web client can report data from SAP BusinessObjects Planning and Consolida4on 10.0 only.
•
Excel client can report data from other EPM products as well as external systems connected through ODBO Excel add-­‐in. Mul4ple reports and charts can be added to a workbook (including mul4ple sources).
Installa4on
•
Web client can work with zero footprint and also with client machines that do not have Microso] Office.
•
Excel client needs to be installed on the client machine and a valid connec4on needs to be created. Agenda
• The Planning Process
• Benefits of a Business Planning Solution
• BPC, an Overview
• The EPM Add-In
• Understanding the BPC Architecture
• Installing / Upgrading BPC
• Leading a successful BPC Implementation
• Demo – A Sales Planning Solution
• Wrap Up
10/21/13
© TruQua. All Rights Reserved. CONFIDENTIAL
Page 61
BPC Architecture...
• The version of the product you choose has
implications on the architectural layout of your
solution.
– If you are an SAP NetWeaver Shop
• Do you currently have SAP BWA?
• Do you want to use SAP HANA?
– Are you comfortable with SUSE Linux as an organization?
• Are you using SAP NetWeaver 7.3?
– If you choose SAP BPC, version for Microsoft Platform
• Are you going to try to integrate with SAP ERP?
• Are you going to try to integrate with SAP BW?
• Are you currently using SQL Server 2012?
SAP BPC 7.x, Version for BPC Microsoft
Front-End Clients
BPC for Office
BPC for Web
Windows Server (32-Bit)
IIS – Internet Information Services
- SOAP Web Services .NET Application Services
(Application Logic Takes Place Here)
BPC Admin
Console
SQL Server
Components
Required
(Not All Services are
64-bit Compliant)
• SSRS – SQL Server
Reporting Services
• SSIS – SQL Server
Integration Services
• SSAS – SQL Server
Analysis Services
Windows Server (64-Bit)
• SSDS – SQL Server
Database Services
Microsoft SQL Server
(2005 or 2008)
10/21/13
© TruQua. All Rights Reserved. CONFIDENTIAL
Page 63
SAP BPC 10, Version for BPC Microsoft
Front-End Clients
EPM Add-In
BPC for
Web
BPC Admin
Console
BPC Web
Rebuilt in
Adobe Flex
IIS – Internet Information Services
- SOAP Web Services -
SQL Server
Components
Required
.NET Application Services
(Application Logic Takes Place Here) *.NET 3.5 *
• SSRS – SQL Server
Reporting Services
Windows Server (*64-Bit*)
• SSIS – SQL Server
Integration Services
Windows Server (64-Bit)
10/21/13
Microsoft SQL Server
(2008 or 2012 as of SP7)
© TruQua. All Rights Reserved. CONFIDENTIAL
• SSAS – SQL Server
Analysis Services
• SSDS – SQL Server
Database Services
Page 64
SAP BPC 7.x, Version for SAP NetWeaver
Front-End Clients
BPC for Office
BPC for
Web
Windows Server
IIS – Internet Information Services
- SOAP Web Services .NET Application Services
BPC Admin
Console
Business
Warehouse
Accelerator
(BWA)
SAP NetWeaver BW 7.01
- Application Logic Takes Place Here (SP5 minimum)
SAP NetWeaver Supported Database
10/21/13
© TruQua. All Rights Reserved. CONFIDENTIAL
(Sybase ASE, MaxDB, Oracle, etc.)
Legend
Page 65
= Optional
SAP BPC 10, Version for SAP NetWeaver
Front-End Clients
EPM Add-In
SAP NetWeaver BW 7.3
SAP Web Application Server (WAS)
- RESTful Services -
BPC Web/Admin
(Redesign)
Rebuilt in
Adobe Flex
Business
Warehouse
Accelerator
(BWA)
SAP Business Warehouse
(Application Logic Takes Place Here)
SAP NetWeaver
Supported
Database
(Sybase ASE,
MaxDB, Oracle,
etc.)
10/21/13
SAP HANA
© TruQua. All Rights Reserved. CONFIDENTIAL
Legend
Page 66
= Optional
Architectural Decision Implications
• BPC, version for the Microsoft platform
– Maximize usage of 64-bit components where possible
– Leverage the Global Cache (BPC 10.0)
• In preliminary tests, using the Global Cache reduced database bottlenecks
– Leverage the latest Microsoft supported release
• SQL Server 2008 for BPC 7.x, version for the Microsoft platform
• SQL Server 2012 (as of SP7) for BPC 10.0, version for the Microsoft platform
• BPC, version for SAP NetWeaver
– Leverage a system you can effectively tune
– Leverage SAP NetWeaver BW Accelerator or SAP HANA when possible
– 64-bit and unicode systems are hard requirements (for BPC 10.0)
– Migrate to SAP NetWeaver BW 7.3 and BPC 10.0 when possible
• This will remove 32-bit bottlenecks (i.e., librfc32.dll for .NET Communication)
Architectural Benefits of Moving to EPM
10.0
• SAP Business Planning and Consolidations 10.0 is more robust and performant!
– BPC 10.0, version for SAP NetWeaver
• Supports SAP HANA
– All cubes are optimized!
» Equivalent of indexing every cube into SAP NetWeaver BW Accelerator
– Measure formulas pushed down to database
– More enhancements to come!
• Broader usage of shared memory
– BW hierarchies
– Report caching
– BPC 10.0, version for the Microsoft platform
•
•
•
•
Eliminates 32-bit dependency
No need for .NET 2.0 or prior (everything is .NET 3.5 or greater)
No COM+ services
Usage of Global Cache eliminates database server bottlenecks
– Sending/Retrieving data
– Data Manager
– Logic
– Log on
Agenda
• The Planning Process
• Benefits of a Business Planning Solution
• BPC, an Overview
• The EPM Add-In
• Understanding the BPC Architecture
• Installing / Upgrading BPC
• Leading a successful BPC Implementation
• Demo – A Sales Planning Solution
• Wrap Up
10/21/13
© TruQua. All Rights Reserved. CONFIDENTIAL
Page 69
Steps to getting BPC into your
Organization…
Installing/Upgrading to BPC
• BPC 10.0, version for SAP NetWeaver is the most widely adopted version of
BPC currently being implemented.
– If you decide to install BPC 10.0 some key questions you need to figure
our are:
• Are you currently using the right platform to support BPC 10.0?
– BPC 10.0 requires SAP NetWeaver 7.3
• Are you planning to leverage BPC on HANA?
– If you decide that BPC 10.0 version for NetWeaver is the right direction
for your organization there are some subsequent questions.
• Are you currently an SAP BW shop?
– Does your organization plan to leverage the same system for
SAP BW that you are going to use for SAP BPC?
– Is BW on version 7.3?
– How long will it take to mobilize the infrastructure team to
upgrade your servers? 6 months?
» Should you install a separate server landscape for SAP BPC?
Source: Jens Koerner
What upgrades are there?
BPC 7.5 MS
BPC 10 MS
Upgrade tool is available, with manual functional upgrade effort
BPC 7.5 NW
BPC 10 NW
Upgrade tool is available, with manual functional upgrade effort
BPC 7.* MS
BPC 7.5 NW
BPC 10 NW
Upgrade tool is available, with manual functional upgrade effort
BPC 7.5 NW
BPC 10 on BW on HANA
Upgrade tool is available, with manual functional upgrade effort
Source: Jens Koerner
In-place upgrade
Upgrade Dev, then QA, then Prod
Dev
7.x ª 10.0
QA
7.x ª 10.0
Prod
7.x ª 10.0
Challenge: No bug fix path in place once Dev is upgraded
unless there is a Maintenance Support System
Source: Jens Koerner
Cutover to new landscape
Create a completely new landscape and retire the
old landscape
Dev 7.x
Dev
10.0
QA 7.x
Prod 7.x
QA 10.0
Prod
10.0
Challenge: Redirect source data from old to new
production system
Source: Jens Koerner
Box split
BPC
BW
Create a completely
new landscape for BPC
only, and keep the old
landscape for SAP
NetWeaver BW
Challenge: Redesign data flow
from one combined SAP
NetWeaver BW/SAP BPC
instance to separate BW and
BPC using Remote Function Calls
(RFC)
Instance strategy
Do you install BPC as an add-on to your existing SAP NetWeaver BW or on a separate SAP
NetWeaver BW server?
Single Instance Separate instance Hardware Investment Performance Administra4on Costs Integra4on Development and Maintenance cost Upgrade Flexibility Support Pack Flexibility BWA Investment leverageable Data Movements http://scn.sap.com/community/epm/blog/2011/10/12/installation-options-for-businessobjects-planning-and-consolidation-100-version-for-netweaver
You have decided to Install and/or
Upgrade
If you have decided to upgrade…
Upgrade a sandbox (ideally a copy of production)
and perform an analysis of what works out of the
box and what breaks. This will be a key exercise to
determine the amount of rework needed.
Verify Installation / Upgrade dependencies
— Software
• The Product Availability matrix
(http://service.sap.com/pam *)
and the install guide spell out the
software dependencies — from an
SAP perspective
• Check with your IT/Basis admins
that these dependencies can be
implemented
• Oftentimes, an SAP NetWeaver BW
or SAP ERP system is only
upgraded once or twice a year
* Requires login credentials to the SAP Service Marketplace
Verify Installation / Upgrade dependencies
— Hardware
• Ensure you size your new environment properly
• Also, do you need new hardware? Procurement
cycles can last months.
Sizing your BPC Instance
• The BPC Sizing guide is very vague.
• Make sure the you leverage the quick sizer on the
service marketplace.
• Size your implementation as if it were and SAP BW-IP
implementation.
• Plan for time during the implementation to revisit
sizing after you have demonstrated the capabilities of
the solution to the business
– The size of the user base during an implementation can grow
exponentially
• Make sure you procure enough servers up front –
procuring servers can take months…
Sizing information
http://service.sap.com/sizing *
www.sdn.sap.com/irj/sdn/performance-analysis
* Requires login credentials to SAP Service Marketplace
Hardware sizing for BPC MS and BPC NW
http://scn.sap.com/community/epm/blog/2012/03/05/bpc-100-nw-netweaver-sizing
Upgrading to BPC 10.0
• Areas that require attention:
– Reports, including VBA (MS and NW)
– BAdIs (NW only)
– Security (NW only)
– Back-end migration (NW only)
Upgrade considerations
BPC 7.5 reports may only be built with EV functions. Here is the list of all former BPC 7.5
functions that are backward-compatible:
evAPD
evAPP
evASD
evAST
evBET
evBNV
evCGP
evCGT
evCOM
evCVW
EPMModelCubeDesc
EPMModelCubeID
EPMEnvDatabaseDesc
EPMEnvDatabaseID
EPMComparison
EPMBook
EPMCommentPartialContext
EPMCommentFullContext
EPMSaveComment
EPMContextMember
evDES
evDIM
evDNV
evGET
EPMMemberDesc
EPMDimensionType
EPMDocumentList
EPMRetrieveData
evGTS
evHNV
evLCK
evMBR
evMNU
evPRO
evPRP
evRNG
evRTI
evSND
evSVR
evTIM
evUSR
OsCLD
EPMScaleData
EPMURL
EPMWorkStatus
EPMSelectMember
EPMExecuteAPI
EPMMemberProperty
EPMDimensionProperty
EPMCellRanges
EPMRefreshTime
EPMSaveData
EPMServer
EPMMemberOffset
EPMUser
EPMDocument
Upgrade considerations (cont.)
Some former EV functions have been turned into EPM add-in features and,
therefore, are not supported anymore:
EVEXP (use the new Report Editor instead)
EVENE
EVNXP
EVSET
EVLST
EVPXR
EVHOT (becomes “Quick Links” functionality in the EPM add-in)
In case you are using one of the functions above in your former reports, you will
have to modify the report manually using the EPM add-in interface
Upgrade considerations (cont.)
• EvDRE reports are backwards-compatible using the EPM 10 add-in
• Once the existing EvDRE function returns OK (meaning that your EvDRE definition is
valid), the EPM add-in ribbon will change and display an Expand button, as well as former
Workbook options (no mix of EvDRE and EPM add-in report on the same spreadsheet)
• Creation of new EvDRE reports through the EvDRE builder wizard is not possible.
However, you can copy an existing one and adapt it to match your new model/
environment.
Upgrade considerations (cont.)
• The EvDRE migration tool exists in order to help customers migrate their BPC 7.5 EvDRE
reports to EPM add-in reports. You can access the tool by selecting the More button, and
then selecting EvDRE Migration (1).
• Several migration options are available: Active Worksheet, Active Workbook, Planning a
Consolidation Server, and Local (2)
2
1
Result of a migrated EvDRE
Ø The generated report layout reflects the same expansions in row and column axes,
compared to the MemberSet parameter used in the EvDRE expansion range
Ø A new formatting sheet is automatically created and filled-in with the formats defined in
your initial EvDRE format range
Ø Sorting, ranking, suppressing, and inserting options are not migrated, neither are all
shifting columns (columns between the row or column header and the data grid, usually
used to display some member properties)
Ø In case of customized reports, manual adjustments may be required
(such as updating BPC 7.5 VBA macros, for example)
Ø A migration log will be generated after each migration process. You can
find it by clicking the More button, and then clicking Log.
EPM macros
• The EPM add-in provides BPC macros and BPC events, but with different names
compared to former BPC 7.5 macros
• For example, former MNU_eSUBMIT_REFSCHEDULE_SHEET_REFRESH macro is now
called SaveWorksheetData and former BEFORE_SEND event is now called BEFORE_SAVE
• Note: In version 7.5, a parameter was needed for BPC events, such as
BEFORE_REFRESH(Argument as String). In the EPM add-in, no parameter is needed:
BEFORE_REFRESH().
Custom menus
Custom menus
– Custom menu functionality is no longer available. Customers should either:
– Move to BPF functionality, displaying and executing Business Process Flow
actions from the EPM pane
– Use the EPMExecuteAPI (former EVMNU) function from a worksheet that could
be linked to a customized ribbon extension, or
– Use Workspaces from the Web portal
EVMNU
– EVMNU function is still supported, but will need to be updated manually with the
new macro names from the new public API
Books and distribution
– Book and distribution templates (definition) are automatically migrated and can be
edited directly through Excel or through the new dedicated UI. Published books will
need to be generated again.
BAdI migration
Note: If you have written any BAdIs against internal
APIs, then those need to be adopted as internal
APIs change in 10.0. These include:
• Get Dimension Members
• Get Current View
• Get Dimensions
• Read Transaction Data
• Write Transaction Data (Write Back)
• Get Metadata
• Process Dimension
• Read Master Data
Security (SAP NetWeaver only)
The migration program
User management and security
SAP Business Planning and Consolidation 7.5 used either Active Directory or CMS
accounts. Version 10 uses SAP NetWeaver accounts, instead.
As part of a migration, user accounts must be recreated in SAP NetWeaver, and
any reference to the user accounts in the environment must be updated to reflect
the new security model
Once the new accounts have been created in SU01, a mapping file (Excel
spreadsheet) with two columns should be created as follows:
This spreadsheet should be saved as a Tab-delimited file
Security (SAP NetWeaver only) (cont.)
The migration program
User management and security (cont.)
•
•
•
•
•
•
References to the user IDs in the OWNER or REVIEWER properties of
dimensions will be properly migrated
References to user IDs in custom-defined properties will NOT be
migrated
The File Service structure will be updated accordingly; domain folders
will be removed
Teams are migrated
Task Access profiles are migrated, but will have new, more descriptive
names
Member access profiles are migrated and are called Data Access
profiles
Back-end migration (SAP NetWeaver only)
The migration program
After importing a 7.5 Application Set with UJBR, run
the Migration Program:
The program name is UJT_MIGRATE_75_TO_10
Called from Transaction Code SE38
Back-end migration (SAP NetWeaver only) (cont.)
The migration program
•
Transaction data and master data can be imported with UJBR before
running the migration program (optional)
–
•
•
•
•
•
Comments are automatically migrated
Journals are automatically migrated
Business rules are automatically migrated
Validations (now called Controls) are automatically migrated
Administration settings and configurations (parameters) are all
automatically migrated
–
•
NOTE: Data Manager log files are not migrated
Content Library is automatically migrated
–
–
•
NOTE: Some settings retained in the Web Admin Client, others retained in the IMG (transaction
SPRO)
All non-custom Data Manager objects are automatically migrated
–
•
NOTE: User-defined order of members is not retained
NOTE: Custom Web pages are not migrated
NOTE: Live Reports are not migrated
BPFs are automatically migrated
–
–
NOTE: Archived instances are not migrated
NOTE: Deprecated actions or actions linking to non-existing content are not migrated
Changes in BPC 10 NW
BPC NW 7.5 – Set Application Set/Application parameters
“Functional” parameters
set by the user
“Configuration” parameters
set by the user
“System” parameters
controlled by the system
E.g.,
APPROVALORG
E.g.,
ALLOW_FILE_SIZE
E.g.,
AVAILABLEFLAG
Table = UJA_USER_DEF
BPC NW 10.0
EXAMPLE:
Set these parameter values
Controlled only through
Set these configuration
The
Application
Setup
Tasks
include
these
steps:
in the UI of the
themain
related
functions
parameter values
Administration Workspace 1. Manage
the KPI Library
or options in the
in IMG
E.g., “Hierarchy” setting
Transaction = SIMGH
Administration Workspace
2. Manage Roles
managed in the
Work Status view
3.
4.
5.
Manage Conversion Factors
Manage Reporting Frameworks
View Organization Hierarchy
E.g., “Change Status” function
Tables = UJA_PARAM (Cross Environment level)/UJA_PARAM_APP (Environment and Model level), except for a few “system”
6. Manage Audit Logs
parameters, which are still stored in UJA_USER_DEF
Source: Jens Koerner
Examples of parameters moved to UI
Parameter:
APPROVALORG
Examples of parameters moved to UI
(cont.)
Parameters:
ORG_INTCO
ORG_PARENTPROPERTY
Parameter:
COMMENT
Content migration
The migration program
•Xcelsius Dashboard
Dashboards are NOT migrated
The following manual steps are required for migration:
•
•
•
Open the old .XLF file in Dashboard Designer
Remove the old EPM connector
Recreate the new connection and set its parameters appropriately
Content migration
The migration program (cont.)
• Custom Menus
– Custom menus are NOT migrated
– That functionality is replaced by the Workspaces and BPF Activity
Workspaces
Taking advantage of SAP HANA’s
strength
Classical Approach
Calculation
APPLICATION
LAYER
DATABASE
LAYER
Calculation
– ª MOVE calculations into database
– ª Only transfer RESULTS
Source: Jens Koerner
Future Approach
21 times faster back-end times*
*Report with 500K cells
Source: Jens Koerner
BPC on SAP HANA stack
BPC on SAP HANA
Enabling/disabling SAP HANA add-on in SPRO
Only use SAP HANA as underlying
RDBMS in place of SQL, Oracle, DB2,
etc., not HANABPC SC
Migration aspects for an SAP HANA
empowered SAP NetWeaver BW
Step 1:
• Database migration for metadata and operational data
• Create Data Definition Language for appropriate target database using report
SMIGR_CREATE_DDL
• Choose target database “SAP In-Memory DB,” unicode, and the target directory
• Run option Database Instance Export from SAP Installation Master from transfer system
• Choose target database “MaxDB”
• Choose “Little Endian” (for OS Linux) and unicode
Step 2:
• Replace SAP NetWeaver BW’s underlying database with SAP HANA database per new
installation of the system copy using the SAP Installation Master for New DB
Step 3:
• Typical post steps in the copy of the SAP
NetWeaver BW system
Option “HANA 1.0, SPS3”
SAP NW BW
RDBMS
BWA
SAP NW BW
HANA
(*) Migrating to further SAP HANA releases is optional
Agenda
• The Planning Process
• Benefits of a Business Planning Solution
• BPC, an Overview
• The EPM Add-In
• Understanding the BPC Architecture
• Installing / Upgrading BPC
• Leading a successful BPC Implementation
• Demo – A Sales Planning Solution
• Wrap Up
10/21/13
© TruQua. All Rights Reserved. CONFIDENTIAL
Page 106
Leading a Successful BPC
Implementation
What are the key success factors for BPC
implementations?
(1)
Product Expertise
(2)
A Structured Project Delivery Methodology
Typical Phases of a BPC
Implementation
Based on the ASAP Methodology
Example Delivery Plan
Implementation Phases
Final
Preparation
Project
Preparation
Business
Blue Print
Realization
RESOURCES/ACTIVITIES
/RESULTS
RESOURCES/ACTIVITIES
/RESULTS
RESOURCES/ACTIVITIES RESOURCES/ACTIVITIES
/RESULTS
/RESULTS
RESOURCES/ACTIVITIES
/RESULTS
Project Manager (100%)
(BPC desireable)
Project Manager (60%)
Project Manager (60%)
Project Manager (60%)
Project Manager (60%)
BPC Solution Architect
(100%)
BPC Solution Architect
(50- 100%)
BPC Solution Architect
(50- 80%)
BPC Solution Architect
(50- 80%)
BPC Platform Consultant
(50% x 2-3 weeks)
BPC Platform Consultant
(50% x 2-3 weeks)
BPC Platform Consultant
(50% x 2-3 weeks)
BPC Platform Consultant
(50% x 2-3 weeks)
BPC Consultants techn.1x BPC Consultants techn.1x
(100%)
(60%)
BPC Consultants techn.1x
(60%)
BPC Consultants funct.
3x (100%)
ABAP Developer
(BPC desirable)
BPC Consultants funct.
1x
(100%)
BPC Solution Architect
(40-60%)
BPC Platform Consultant
(50-100%)
BPC Consultants techn.1x
Project Manager (100%)
(100%) (BW Integration)
IT Responsible (50-100%)
Business Leads (20%)
BPC Consultants funct.
1-3x
(80%)
(optional) ECC Integration
Consultant
Business and IT
Representatives, PM,
nominated endusers
Business and IT
Representatives, PM,
Super user
BPC Consultants funct.
2x
(100%)
ABAP Developer
(BPC desirable)
Enduser, Business and IT
Representatives, PM
Go-Live &
Support
Enduser, Business and IT
Representatives, PM
Business Blueprint
ASAP Methodology for Implementation 7.1
Project
Preparation
Business
Blue Print
Realization
Final
Preparation
Go-Live &
Support
BPC is a very versatile tool and can be used to cover many different business
processes. A BPC Business Blueprint document can therefore look quite differently
depending on the type of project and on the client as well.
Due to the nature of BPC, there is not a single template that will fit all requirements.
This presentation will follow the least common denominator approach to identify
those points that should be included in any blueprint document.
Business Blueprint Scoping
• The blueprinting activity is a key activity in any
BPC project. It is key not to underestimate the
time required for this task (at least 20 to 30
percent of the total time of the project – depends
on the availability of documented requirements)
• Here are some of the factors that will impact the
blueprinting effort:
• Type of project (Planning, Consolidation)
• Number of processes to be covered
• Level of details required
Business Blueprint Process
The blueprint document should reflect what is going to be customized in BPC.
Therefore it is key that:
– Written in a way that the Business / IT departments fully understand it
– Use appropriate terminology
– Have an appropriate level of details
– Sign-off of the blueprint is essential and no implementation should start before
a formal sign-off.
– Any change requested after the sign-off should go through a change request
process.
Important “must-be” steps:
– Detail Design Documents will provide additional structure and could be
leveraged in documentation and for unit testing (lean implementation model)
– Prototyping is a key for early user involvement and to prove designs. It
reduces change management efforts during Go-Live Preparation (lean
implementation model)
Business Blueprint Content
Table of Content
–
–
–
–
–
–
–
–
–
–
–
–
–
Introduction
Management/Executive Summary
Project
Description of AS-IS Situation
Description of TO BE Situation
Processes to be covered
Data Model
Data Sources
Security Concept
Operational Concept
Backup approach
System Landscapes and Transports
Historical Data Migration Concept
Business Blueprint Content - AS-IS /
TO-BE processes
•
The current process and the future process need to be described from
• A user point of view
– Describe how user interact with the system (data input, execution of calculations, set
status, …)
• A System point of view
– Maintenance of system (master data)
– Data flows
– Calculations
Benefit: the comparison of the AS-IS and TO BE processes from a user point of view can then be a
good starting point for Change Management activities
Relevant information in process description:
• High level and detailed description of process
• Business Requirements
• User Roles
• Security requirements
• Setup and Customizing in BPC (BPF, Input Schedules/reports, Calculations, Data Model)
• Custom development requirements
• Improvements compared to current process
Business Blueprint Content - Data Model
and Data Sources
• The Data Model should at least have the following information
• List of all applications
• List of dimensions per application (and dimension type)
• High level content for each dimension
• List of properties for each dimension
• Description of internal data flows between applications
• The Data Sources need to be specified for the following type of data:
• Master Data
• Transaction Data
• For each type data, the source system should be identified and a data import concepts
need to be defined, this would include:
• Central / De-central data load
• Automatic / Manual trigger
• Full vs. Incremental load
• Technology used for data load (out-of-the box, development in ABAP, ...)
Business Blueprint Content - Operational Concept
(Application Management) and Backup (Archiving)
Approach
• The operational concept should include
• System Maintenance
– Maintenance of master data (frequency, responsibility)
– Initialization of system for a new period
– Roll-out of application updates/fixes
• User Maintenance
– Responsibility for maintenance
• Concept for service packs / updates
– Testing
– Roll-out of local client (if applicable)
• The backup approach needs to be addressed from a global point of view, if BPC is not run on a
dedicated NW server. In that case, the backup strategy will have to be aligned to the strategy
of the NW environment.
• If the NW instance is dedicated to BPC, then a strategy can be defined specifically for BPC and
it should include:
• Frequency, Type of backup. Restore possibilities and time estimation
Business Blueprint - System Landscape
and Transports
• This point should define the number of system that will be used
(usually Development, Quality and Production).
• à Sandbox system is strongly recommended for Support Pack
regression tests, prototyping etc
• It should be clearly specified where each type of object will be
maintained (for example reports) to specify what needs to be
transported.
• For master data, the maintenance should also be detailed,
especially for those dimension where the maintenance will be
done manually.
• It is also a good idea to come up with an emergency fix concept,
for urgent fixes that need to be applied to a production system
and that might not go through the full release process.
Business Blueprint - Historical Data
Migration
• The migration of Historical Data should include at
least the following information:
• Source system (or systems)
• Number of periods required
• Approach (for calculations, mapping of dimension members, …)
à Migration efforts should not be underestimated and could have
an impact on the interfaces (might additional temporary
interfaces required)
Method-based Quality Assurance
Method-based Quality Assurance
Project
Preparation
•
•
•
•
Business
Blue Print
Realization
Final
Preparation
Go-Live &
Support
The preferred approach is to integrate the Quality Assurance activities in the project plan. These
activities should be carried out throughout the project lifecycle and cover all aspects of the project.
There will be 3 different types of reviews:
Ø Functional
Ø Technical
Ø Project Management
Each review should be carried out by experienced resources in the relevant topics, it is also key that
the resources engaged in the reviews are not part of the delivery team.
The Quality Assurance team will be responsible for delivering reports at the different phases of the
project
BPC Reviews
Stage Gate 1
Milestone 1
Stage Gate 2
Stage Gate 3
Milestone n
Implementation
Project
Preparation
Business
Blue Print
Technical:
• Architecture and
Installation Sizing
Review
Functional:
• Project Plan review
• Stage Gate review
• Design advisory
PM:
• Project Plan review
Realization
Technical:
• Review of the BPC
• Transport
• process, -Performance
• Analysis
• Milestone review
• Technical *
Functional:
• Milestone review
• Application *
• Stage Gate review
• (Build review)
Final
Preparation
Go-Live &
Support
Technical:
• QA of open technical
• Issues, Performance
• Test Design Review
Technical:
• Review the
maintenance hand
ongoing optimization
measures put in place
for the Go Live,
Review of the
operational processes
and technical handover
to operations
Functional:
• Stage Gate review
QA Roles - Commitment
BPC QA Roles Role descrip7on QA Slot Phase days Technical QA Architecture, Installa4on, Sizing Review BBP 5 days Func4onal QA Design advisory BBP 1 day/ week PM QA Project Plan review BBP 2 days Func4onal QA Project Plan review BBP 2 days Func4onal QA Func4onal QA Stage Gate review BBP 3 days Milestone review Applica4on * Realiza4on 2-­‐3 days / cri4cal milestone Technical QA Realiza4on ~ 10 days Technical QA Review of the BPC Transport process, -­‐
Performance Analysis Milestone review Technical * Realiza4on 1-­‐2 days (op4onal) Func4onal QA Stage Gate review (Build review) Realiza4on 5 days Func4onal QA Stage Gate review 3-­‐5 days Technical QA QA of open technical Issues, Performance Test Design Review Technical QA Review of the maintenance and ongoing op4miza4on measures put in place for the Go Live, Review of the opera4onal processes and technical handover to opera4ons Final Prepara4on (Test Phase) Final Prepara4on (Test Phase) Go-­‐Live & Support ~ 5-­‐ 10 days ~ 5-­‐10 days Step-by-Step
1) Agree on Quality Assurance scope
• Project management, executive sponsor and client representative
2) Secure Quality Assurance team
• Quality Assurance stream lead
3) Define Quality Assurance plan
• Project management, Solution Architect and Quality Assurance stream lead
4) Provide budget
• Project management
5) Present Quality Assurance team to client
• Project management, Design Authority and Quality Assurance team
Review approach and examples
Reviews as part of the Quality Assurance stream are following the same approach.
1) Assessment of status quo and pain points with relevant client representative
and project team members (different views)
2) Execute review and document results
3) Present outcome to the client representative and project team member
4) Formalize report and present results to the stakeholders
– The „must-be“ reviews are on the following topics:
• Business Blueprint review
• Implementation review (Assessment of build quality - Functional review)
• Performance review (reports / input schedules, calculations)
Blueprint and Implementation Reviews
Blueprint – and Implementation Reviews are considered as usually a „5 day
initiative“
To secure on the project stages Business Blueprints and Realization that
①
Implementation of business requirements are following „best practices“
as much as possible (like business rules instead of script logic, Process
Flows instead of one huge workbook) but also giving some advisory
regarding project approach
②
to proof the implemented solution if potential risks are considered
during the build (like maintenance efforts for the model, performance
etc.) – Milestone-based
Mandatory outcome for any review:
à Provide an action plan (with type of resources and planned
activities)
Performance Reviews Methodology
Preparation:
①
Get an understanding about the implemented solution anticipate
potential performance impacts.
②
Get the most critical report (if reporting has performance issues) to
check VBA usage, usage of formatting, member selections, no. of
formulas (BPC 7.x/EPM 10), no. of sheets in a workbook.
③
Request system access for BPC client, BW backend server with the
authorization to UJSTAT
Execution:
①
Get in touch with client stakeholders / implementation team and make
short interviews to understand the individual experiences about the
performance
②
Check provided information regarding client settings, server settings,
BWA etc.
Performance Reviews Methodology
(cont‘d)
Reporting runtime issues
①
If several sheets are used isolate them and run them one by one and the
workbook
②
Run stress tests and benchmark with iterative approach and document
result using Tcodes UJSTAT, MDXTEST etc.
③
Benchmark Networktime using Fiddler etc.
④
Activate / Deactivate VBA, formatting etc to identify the bottlenecks
⑤
Either eliminate bottlenecks directly or make a list of action items
Performance Reviews
Methodology (cont‘d)
Write-back runtime issues
①
Check writeback time in UJSTAT
②
Analyze the default logic and, if used, the called BAdI
③
Test script logic using UJK_Script_LOGIC_TESTER
④
Improve script logic and/or ABAP or request a scripting
resource to do it
⑤
Analyze write-back calculations and evaluate potential
batch jobs (real-time vs near-time availability of
calculated no.)
Performance Reviews
Methodology (cont‘d)
Logon issues
①
Check on different client desktops (document different client
settings)
②
Check on BPC clients installed on the .NET Server (usually different
client settings as no standard client images)
③
④
Check logon process (download dimension files etc)
Check SDN, Customer Message System to identify potential
bugs/side effects from SPs as usually client logon issues are reported
soon from clients
à Open customer message as soon it looks into a direction of SW
related issues
Performance Reviews Findings
– Possible reasons for performance issues :
– Lack of data in the development system (reports were build on
completely empty applications), so the performance of the reports
could not be assessed upfront (some dummy data should be
generated in the development system)
– Lack of stress testing activities in project plan in system with large
number of concurrent users
– Design errors. An application, calculation or report were designed
in a way that they could not be performant
– Performance is a very important component in a project and it
should be addressed right from the beginning of the project.
Pushing the performance topic to the end of a project will most of
the time end up causing delays in the project.
Remember…
Key success factors for BPC implementations:
ü
Product Expertise
ü
A structured Project Delivery using Best Practices
ü
Method-based Scoping and Implementation efforts
ü
Blueprinting
ü
Project Quality Assurance
Agenda
• The Planning Process
• Benefits of a Business Planning Solution
• BPC, an Overview
• The EPM Add-In
• Understanding the BPC Architecture
• Installing / Upgrading BPC
• Leading a successful BPC Implementation
• Demo – A Sales Planning Solution
• Wrap Up
10/21/13
© TruQua. All Rights Reserved. CONFIDENTIAL
Page 131
A Sales Planning Case Study / Demo
Agenda
• The Planning Process
• Benefits of a Business Planning Solution
• BPC, an Overview
• The EPM Add-In
• Understanding the BPC Architecture
• Installing / Upgrading BPC
• Leading a successful BPC Implementation
• Demo – A Sales Planning Solution
• Wrap Up
10/21/13
© TruQua. All Rights Reserved. CONFIDENTIAL
Page 133
Q& A
?
10/21/13
© TruQua. All Rights Reserved. CONFIDENTIAL
Page 134
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )