HARTZELL PROPELLER INC. One Propeller Place Piqua, Ohio 45356-2634 U.S.A. Telephone: 937.778.4200 Fax: 937.778.4215 MANUAL REVISION TRANSMITTAL Manual 128 (61-00-28) Blade Shank Rolling Machine Maintenance Manual REVISION 3 dated June 2023 Remove Pages: Insert Pages: ENTIRE MANUAL ENTIRE MANUAL NOTE: When the manual revision has been inserted in the manual, record the information required on the Record of Revisions page in this manual. This page may be discarded after proper filing of the revision. (Blank Page) Manual No. 128 61-00-28 Revision 3 June 2023 Blade Shank Rolling Machine Maintenance Manual Hartzell Propeller Inc. One Propeller Place Piqua, Ohio 45356-2634 U.S.A. Phone: 937.778.4200 Fax: 937.778.4215 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (Blank Page) © 2002, 2016, 2017, 2023 - Hartzell Propeller Inc. - All rights reserved COVER 61-00-28 Page 2 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 REVISION 3 HIGHLIGHTS Revision 3, dated June 2023, incorporates the following: Front matter (Cover, Revision Highlights, etc.), has been revised to match this revision. Updated the Hartzell Propeller Inc. logo on the cover and revised the header on all pages. Minor language/format changes and renumbering, if applicable are marked with a revision bar, but are not listed below. • TROUBLESHOOTING • Revised the section, "Troubleshooting Guide" • REPAIR AND REPLACE • Revised the section, "General Component Replacement" • Incorporated TR-001 that revised the section, "Pillow Blocks (660, 680)" REVISION HIGHLIGHTS 61-00-28 Page 1 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (Blank Page) REVISION HIGHLIGHTS 61-00-28 Page 2 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 REVISION 3 HIGHLIGHTS 1. Introduction A. General (1) This is a list of current revisions that have been issued against this manual. Please compare to the RECORD OF REVISIONS page to make sure that all revisions have been added to the manual. B. Components (1) Revision No. indicates the revisions incorporated in this manual. (2) Issue Date is the date of the revision. (3) Comments indicates the level of the revision. (a) New Issue is a new manual distribution. The manual is distributed in its entirety. All the revision dates are the same and no change bars are used. (b) Reissue is a revision to an existing manual that includes major content and/or major format changes. The manual is distributed in its entirety. All the revision dates are the same and no change bars are used. (c) Major Revision is a revision to an existing manual that includes major content or minor format changes over a large portion of the manual. The manual is distributed in its entirety. All the revision dates are the same, but change bars are used to indicate the changes incorporated in the latest revision of the manual. (d) Minor Revision is a revision to an existing manual that includes minor content changes to the manual. Only the revised pages of the manual are distributed. Each page retains the date and the change bars associated with the last revision to that page. Revision No. Issue Date Comments Original Revision 1 Revision 2 Revision 3 Dec/02 Jul/16 Oct/17 Jun/23 Original Issue Minor Revision Minor Revision Major Revision REVISION HIGHLIGHTS 61-00-28 Page 3 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (Blank Page) REVISION HIGHLIGHTS 61-00-28 Page 4 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 RECORD OF REVISIONS This is a permanent historical record of revisions inserted into this manual. Revision 3 includes all prior revisions. Revision Number Issue Date Date Inserted Inserted By 3 Jun/23 Jun/23 HPI Revision Number RECORD OF REVISIONS Issue Date Date Inserted 61-00-28 Inserted By Page 1 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (Blank Page) RECORD OF REVISIONS 61-00-28 Page 2 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 RECORD OF TEMPORARY REVISIONS Update this page to show all Temporary Revisions inserted into this manual. Revision 3 includes all prior temporary revisions, up to and including TR-001. Temporary Revision No. Section/ Page Issue Date Date Inserted RECORD OF TEMPORARY REVISIONS Inserted By Date Removed 61-00-28 Removed By Page 1 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (Blank Page) RECORD OF TEMPORARY REVISIONS 61-00-28 Page 2 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 SERVICE DOCUMENT LIST CAUTION 1: DO NOT USE OBSOLETE OR OUTDATED INFORMATION. PERFORM ALL INSPECTIONS OR WORK IN ACCORDANCE WITH THE MOST RECENT REVISION OF THE SERVICE DOCUMENT. INFORMATION CONTAINED IN A SERVICE DOCUMENT MAY BE SIGNIFICANTLY CHANGED FROM EARLIER REVISIONS. FAILURE TO COMPLY WITH INFORMATION CONTAINED IN A SERVICE DOCUMENT OR THE USE OF OBSOLETE INFORMATION MAY CREATE AN UNSAFE CONDITION THAT MAY RESULT IN DEATH, SERIOUS BODILY INJURY, AND/OR SUBSTANTIAL PROPERTY DAMAGE. CAUTION 2: THE INFORMATION FOR THE DOCUMENTS LISTED INDICATES THE REVISION LEVEL AND DATE AT THE TIME THAT THE DOCUMENT WAS INITIALLY INCORPORATED INTO THIS MANUAL. INFORMATION CONTAINED IN A SERVICE DOCUMENT MAY BE SIGNIFICANTLY CHANGED FROM EARLIER REVISIONS. REFER TO THE APPLICABLE SERVICE DOCUMENT INDEX FOR THE MOST RECENT REVISION LEVEL OF THE SERVICE DOCUMENT. Service Document Number Incorporation Rev./Date Service Document Number SERVICE DOCUMENT LIST Incorporation Rev./Date 61-00-28 Page 1 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 SERVICE DOCUMENT LIST Service Document Number Incorporation Rev./Date Service Document Number SERVICE DOCUMENT LIST Incorporation Rev./Date 61-00-28 Page 2 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 LIST OF EFFECTIVE PAGES Chapter Page Cover/Cover Back Cover/Cover Back Revision Highlights 1 thru 4 Record of Revisions 1 thru 2 Record of Temporary Revisions 1 thru 2 Service Document List 1 thru 2 List of Effective Pages 1 thru 2 Table of Contents 1 thru 2 Introduction 1 thru 12 Description and Operation 1 thru 6 Troubleshooting 1-1 thru 1-16 Maintenance and Checks 2-1 thru 2-6 Repair and Replace 3-1 thru 3-18 Machine Setup and Testing 4-1 thru 4-24 Special Tools, Fixtures, and Equipment 5-1 thru 5-4 Illustrated Parts List 6-1 thru 6-18 LIST OF EFFECTIVE PAGES Rev. Level Date Rev. 3 Rev. 3 Rev. 3 Rev. 3 Rev. 3 Rev. 3 Rev. 3 Rev. 3 Rev. 3 Rev. 3 Rev. 3 Rev. 3 Rev. 3 Rev. 3 Rev. 3 Jun/23 Jun/23 Jun/23 Jun/23 Jun/23 Jun/23 Jun/23 Jun/23 Jun/23 Jun/23 Jun/23 Jun/23 Jun/23 Jun/23 Jun/23 61-00-28 Page 1 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (Blank Page) LIST OF EFFECTIVE PAGES 61-00-28 Page 2 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 TABLE OF CONTENTS REVISION HIGHLIGHTS....................................................................................................... 1 RECORD OF REVISIONS .................................................................................................... 1 RECORD OF TEMPORARY REVISIONS.............................................................................. 1 LIST OF EFFECTIVE PAGES................................................................................................ 1 TABLE OF CONTENTS.......................................................................................................... 1 INTRODUCTION.................................................................................................................... 1 DESCRIPTION AND OPERATION......................................................................................... 1 TROUBLESHOOTING........................................................................................................ 1-1 MAINTENANCE AND CHECKS.......................................................................................... 2-1 REPAIR AND REPLACE..................................................................................................... 3-1 MACHINE SETUP AND TESTING...................................................................................... 4-1 SPECIAL TOOLS, FIXTURES, AND EQUIPMENT............................................................. 5-1 ILLUSTRATED PARTS LIST............................................................................................... 6-1 TABLE OF CONTENTS 61-00-28 Page 1 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (Blank Page) TABLE OF CONTENTS 61-00-28 Page 2 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 INTRODUCTION - CONTENTS 1. Statement of Purpose.................................................................................................. 3 A. General.................................................................................................................. 3 B. Item References..................................................................................................... 4 2. Required Publications.................................................................................................. 4 A. Hartzell Propeller Inc. Publications........................................................................ 4 B. Vendor Publications............................................................................................... 4 3. Minimum Facility and Tooling Requirements............................................................... 5 A. Tooling.................................................................................................................... 5 B. Facilities................................................................................................................. 5 4. Component Life and Service....................................................................................... 6 A. Routine Maintenance............................................................................................. 6 B. Repair..................................................................................................................... 6 5. Hartzell Propeller Inc. Contact Information.................................................................. 7 A. Product Support Department................................................................................. 7 B. Technical Publications Department........................................................................ 7 C. Recommended Facilities........................................................................................ 7 6. Definitions.................................................................................................................... 8 7. Abbreviations............................................................................................................. 10 INTRODUCTION 61-00-28 Page 1 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (Blank Page) INTRODUCTION 61-00-28 Page 2 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 1. General A. Statement of Purpose (1) This manual has been reviewed and accepted by the FAA. Additionally, this manual contains data that has been approved in a manner acceptable to the FAA administrator. (2) This manual provides routine maintenance and limited repair and parts replacement procedures for the DT-1724-3(F) rolling machine. (3) These procedures support the eligibility requirements for the rolling machine maintenance program as specified in the Approved Facilities chapter of Hartzell Propeller Inc. Standard Practices Manual 202A (61-01-02). (4) Only those repairs and parts replacements specified in this manual are authorized by Hartzell Propeller Inc. (5) Contact the Product Support Department of Hartzell Propeller Inc. about any maintenance problems or to request information not included in this publication. (6) This manual is to be used by propeller repair stations with personnel who are trained and experienced with Hartzell Propeller Inc. products. (a) (7) This manual does not provide complete information for an inexperienced technician to attempt DT-1724-3(F) rolling machine maintenance without supervision. This manual is intended to be the primary source of maintenance information for the DT-1724-3(F) rolling machine. (a) Information published in Service Bulletins, Service Letters, Service Advisories, and Service Instructions may supersede information published in this manual. The reader must consult active Service Bulletins, Service Letters, Service Advisories, and Service Instructions for information that may have not yet been incorporated into the latest revision of this manual. (8) This manual makes reference to other Hartzell Propeller Inc. manuals that provide important details such as consumable materials, tooling, approved facilities, and check procedures for the DT-1724-3(F) rolling machine. (9) Where possible, this manual is written in the format specified by ATA iSpec 2200. INTRODUCTION 61-00-28 Page 3 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 B. Item References (1) Item references throughout the text in this manual refer to item numbers in the Illustrated Parts List chapter of this manual. The item numbers appear in parentheses directly following the part name. Only the item base number will appear in the text of the manual. Item base numbers and the alpha variants of the base numbers will appear in the illustrated parts list. There are two reasons for the use of alpha variants: (a) A part may be superseded, replaced, or obsoleted by another part. For example, the pitch change block unit (105733) that is item 320 was superseded by the pitch change block unit (105733-1) that is item 320A. (b) An Illustrated Parts List may contain multiple configurations. Effectivity codes are used to distinguish different part numbers within the same list. For example, one configuration may use a piston (B-2419) that is item 80, yet another configuration uses a piston (104256) that is item 80A. Effectivity codes are very important in the determination of parts in a given configuration. 2. Reference Publications A. Hartzell Propeller Inc. Publications (1) Information published in Service Bulletins, Service Letters, Service Advisories, and Service Instructions may supersede information published in this manual. The reader must consult active Service Bulletins, Service Letters, Service Advisories, and Service Instructions for information that may have not yet been incorporated into the latest revision of this manual. (2) In addition to this manual, one or more of the following publications are required for information regarding specific recommendations and procedures to maintain the DT-1724-3(F) rolling machine that is included in this manual. Manual No. (ATA No.) Available at www.hartzellprop.com Manual 133C (61-13-33) - Aluminum Blade Overhaul Manual Manual 165A (61-00-65) Yes Illustrated Tool and Equipment Manual Manual 202A (61-01-02) Vol. 7, Yes Vol. 11, Yes Hartzell Propeller Inc. Manual Title Standard Practices Manual, Volumes 1 through 11 B. Vendor Publications None. INTRODUCTION 61-00-28 Page 4 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 3. Minimum Facility and Tooling Requirements A. Tooling (1) Propeller repair stations certified by the FAA or international equivalent to overhaul Hartzell Propeller Inc. propellers are expected to possess precision fixtures, tools, and gauges necessary for inspection and parts replacement of the blade shank rolling machine. (2) While Hartzell Propeller Inc. does not maintain an exact list of standard tools used in repair or servicing the DT-1724-3(F) blade shank rolling machine, Hartzell Propeller Inc. frequently also requires the use of special tools during servicing, repair, or overhaul. (a) The Hartzell Propeller Inc. Illustrated Tool and Equipment Manual 165A (61-00-65) supplies this necessary tooling information. (b) It is the responsibility of the repair station or the technician performing the repair or servicing to use these special tools as required. (c) Except as specifically required in this manual, locally fabricated tooling is acceptable for most repair and inspection operations. B. Facilities (1) A compression rolling approved facility is a facility that is approved by Hartzell Propeller Inc. to perform the procedures required by Hartzell Propeller Inc. Aluminum Blade Overhaul Manual 133C. Approved facilities are the ONLY shops that are authorized by Hartzell to return compression rolled parts to service. (2) Requirements for an approved facility are outlined in the Approved Facilities chapter of Hartzell Propeller Inc. Standard Practices Manual 202A (61-01-02). (3) An approved facility may be eligible to become part of the rolling machine maintenance program, as an alternative method of maintaining and making sure of the reliability of their DT-1724-3(F) rolling machine. Refer to the Approved Facilities chapter of Hartzell Propeller Inc. Standard Practices Manual 202A (61-01-02) for information concerning the rolling machine maintenance program. INTRODUCTION 61-00-28 Page 5 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 4. Component Life and Service A. Routine Maintenance (1) Routine Maintenance is the periodic disassembly, cleaning, inspecting, repairing as necessary, reassembling, and testing in accordance with the instructions contained in this manual. (2) The maintenance interval for certain components is based on calendar time, as specified. (a) At such specified periods, certain parts should be inspected and repaired, or replaced, as applicable, in accordance with this manual. B. Repair (1) The design of DT-1724-3(F) machine is prescribed and controlled by Hartzell Propeller Inc. Refer to the Illustrated Parts list chapter of this manual for machine drawings and parts list. (2) All inspections and repair procedures described in this manual are controlled by Hartzell Propeller Inc. Product Engineering. (3) For hydraulic booster (410) information or factory repair, contact DE-STA-CO MANUFACTURING: 691 North Squirrel Road Suite 250 Auburn Hills, MI 48326 (248) 534-1111 FAX (248) 836-6740 Toll Free: 888-DESTACO (337-8226) Toll Free Fax: 800-682-9689 www.destaco.com INTRODUCTION 61-00-28 Page 6 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 5. Hartzell Propeller Inc. Contact Information (Rev. 2) A. Product Support Department (1) Contact the Product Support Department of Hartzell Propeller Inc. about any maintenance problems or to request information not included in this publication. NOTE: When calling from outside the United States, dial (001) before dialing the telephone numbers below. (a) Hartzell Propeller Inc. Product Support may be reached during business hours (8:00 a.m. through 5:00 p.m., United States Eastern Time) at (937) 778-4379 or at (800) 942-7767, toll free from the United States and Canada. (b) Hartzell Propeller Inc. Product Support can also be reached by fax at (937) 778-4215, and by e-mail at techsupport@hartzellprop.com. (c) After business hours, you may leave a message on our 24 hour product support line at (937) 778-4376 or at (800) 942-7767, toll free from the United States and Canada. (d) 1 A technical representative will contact you during normal business hours. 2 Urgent AOG support is also available 24 hours per day, seven days per week via this message service. Additional information is available on the Hartzell Propeller Inc. website at www.hartzellprop.com. B. Technical Publications Department (1) For Hartzell Propeller Inc. service literature and revisions, contact: Hartzell Propeller Inc. Telephone: 937.778.4200 Attn: Technical Publications Department Fax: 937.778.4215 One Propeller Place E-mail: manuals@hartzellprop.com Piqua, Ohio 45356-2634 U.S.A. C. Recommended Facilities (1) Hartzell Propeller Inc. recommends using Hartzell-approved distributors and repair facilities for the purchase, repair, and overhaul of Hartzell propeller assemblies or components. (2) Information about the Hartzell Propeller Inc. worldwide network of aftermarket distributors and approved repair facilities is available on the Hartzell website at www.hartzellprop.com. INTRODUCTION 61-00-28 Page 7 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 6. Definitions (Rev. 4) A basic understanding of the following terms will assist in maintaining and operating Hartzell Propeller Inc. propeller systems. Term Definition Abrupt Transition A physical difference in diameter in the pressure transition zone of a blade shank caused by a sudden decrease in rolling pressure during the rolling process Alignment Bushing An alignment bushing is either a drill bushing or manufactured steel bushing with a through bore of 0.753 ±0.001 inches (19.12 ±0.025 mm). This bushing is used to control the concentricity of the face plate weldment shaft to the right angle gear motor shaft during the assembly process described in this manual. Blemish An imperfection with visible attributes, but having no impact on safety or utility Brinelling A depression caused by failure of the material in compression Bulge An outward curve or bend Compression Rolling A process that provides improved strength and resistance to fatigue Defect An imperfection that affects safety or utility Delamination Internal separation of the layers of composite material Dent The permanent deflection of the cross section that is visible on both sides with no visible change in cross sectional thickness Depression Surface area where the material has been compressed but not removed Distortion Alteration of the original shape or size of a component Dragging A resistance to the roller rotation when moving on a spinning blade. Dragging can cause blade surface damage Fretting Damage that develops when relative motion of small displacement takes place between contacting parts, wearing away the surface Galling To fret or wear away by friction INTRODUCTION 61-00-28 Page 8 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 Term Definition Gouge Surface area where material has been removed Hazardous Propeller Effect The hazardous propeller effects are defined in Title 14 CFR section 35.15(g)(1) Jog A term used to describe movement up/down, left/right, or on/off in short incremental motions Nick Removal of paint and possibly a small amount of material Pitting Formation of a number of small, irregularly shaped cavities in surface material caused by corrosion or wear Porosity An aggregation of microvoids. See “voids”. Propeller Critical Parts A part on the propeller whose primary failure can result in a hazardous propeller effect, as determined by the safety analysis required by Title 14 CFR section 35.15 Scratch Same as “Nick” Short Circuit Connection of low resistance between points on a circuit between which the resistance is normally much greater Ticking A series of parallel marks or scratches running circumferentially around the diameter of the blade Test Bar A machined round bar used to check runout and parallelism of the chuck to the carriage. The diameter runout should not be greater than 0.001 inch (0.025 mm). Wrinkle (aluminum blade) A wavy appearance caused by high and low material displacement INTRODUCTION 61-00-28 Page 9 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 7. Abbreviations (Rev. 2) Abbreviation Term AD Airworthiness Directives AMM Aircraft Maintenance Manual AOG Aircraft on Ground AR As Required ATA Air Transport Association CSU Constant Speed Unit FAA Federal Aviation Administration FH Flight Hour FM Flight Manual FMS Flight Manual Supplement Ft-Lb Foot-Pound HMI Human Machine Interface ICA Instructions for Continued Airworthiness ID Inside Diameter In-Lb Inch-Pound IPL Illustrated Parts List IPS Inches Per Second kPa Kilopascals Lb(s) Pound(s) Max. Maximum Min. Minimum MIL-X-XXX Military Specification MPI Major Periodic Inspection (Overhaul) MS Military Standard MSDS Material Safety Data Sheet N Newtons INTRODUCTION 61-00-28 Page 10 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 Abbreviation Term N/A Not Applicable NAS National Aerospace Standards NASM National Aerospace Standards, Military NDT Nondestructive Testing NIST National Institute of Standards and Technology N•m Newton-Meters OD Outside Diameter OPT Optional PC Production Certificate PCP Propeller Critical Part PLC Programmable Logic Controller PMB Plastic Media Blasting (Cleaning) POH Pilot’s Operating Handbook PSI Pounds per Square Inch RF Reference RPM Revolutions per Minute SAE Society of Automotive Engineers STC Supplemental Type Certificate TBO Time Between Overhaul TC Type Certificate TSI Time Since Inspection TSN Time Since New TSO Time Since Overhaul UID Unique Identification WIG Wing-In-Ground-Effect INTRODUCTION 61-00-28 Page 11 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (Blank Page) INTRODUCTION 61-00-28 Page 12 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 DESCRIPTION AND OPERATION - CONTENTS 1. Description................................................................................................................... 4 A. DT-1724-3 Rolling Machine Principles of Operation.............................................. 4 B. Electrical Switch Operations.................................................................................. 6 LIST OF ILLUSTRATIONS Rolling Machine DT-1724-3(F).........................................................Figure 1......................... 3 Rolling Machine DT-1724-3(F) Roller Head Assembly.....................Figure 2......................... 5 Rolling Machine DT-1724-3(F) Carriage Traverse Motor.................Figure 3......................... 5 DESCRIPTION AND OPERATION 61-00-28 Page 1 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (Blank Page) DESCRIPTION AND OPERATION 61-00-28 Page 2 Rev. 3 Jun/23 Main Power Switch (690) W10515 Blade Drive Motor Start Cycle Switch LS-3 (700) Carriage Carriage (Blade Drive Motor) Switch - LS-7 (835) HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 Rolling Machine DT-1724-3(F) Figure 1 DESCRIPTION AND OPERATION 61-00-28 Page 3 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 1. Description A. DT-1724-3(F) Rolling Machine Principles of Operation (1) The roller portion of the unit consists of a roller head that rotates to follow the blade retention radius. (a) (2) The roller assembly uses a small, reversible motor to drive a geared wheel to which the roller head is attached. As this wheel rotates, it rotates the roller head through the required radius. (a) (3) This unit is mounted on a carriage that moves parallel to the blade centerline to extend the rolled area beyond the radius. The range of movement of the roller is controlled by a microswitch placed at each end of travel. The carriage movement is controlled automatically by an electric motor. (a) The rolling operation begins with the carriage full forward (nearest the blade butt). (b) Once the roller head has ­proceeded through the radius portion of the rolling process, the carriage will begin to move toward the tip of the blade, ­parallel to the blade centerline. (c) The roller pressure is gradually decreased to zero. (1) (4) The reduction of roller pressure is ­accomplished by releasing the hydraulic pressure, which is ­automatically controlled by a mechanical check valve installed in the air line. The carriage traverse motor controls the forward and aft ­movement of the carriage. (a) Start and stop action is controlled by microswitches located at the stops at either end of the carriage travel. (1) The forward switch activates the rolling action when the carriage has reached the full forward position. (2) The aft switch stops the carriage movement at the home position. DESCRIPTION AND OPERATION 61-00-28 Page 4 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 Carriage (1010) Blade Drive Motor Switch (835) Carriage Return Switch (830) Roller Motor Limit Switch (300) Blade Drive Motor Switch (835) Carriage (1010) Roller Head Drive Motor (500) Roller Motor Aft Direction Limit Switch - LS-6 (315) Csk718-2a Roller Support Arm (1110) Rolling Machine DT-1724-3(F) Roller Head Assembly Figure 2 Carriage Traverse Motor Drive Shaft Worm Gear (180) Csk718-1a Roller Motor Forward Direction Limit Switch LS-5 (300) Rolling Machine DT-1724-3(F) Carriage Traverse Motor Figure 3 DESCRIPTION AND OPERATION 61-00-28 Page 5 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 B. Electrical Switch Operations NOTE: (1) Main Power Switch (690) (a) (2) (4) (6) Starts the rolling machine cycle. Carriage (Aft Stop) Switch -LS-2 (730) (not shown) (a) Stops aft movement of the carriage at the start position. (b) Cuts power to the carriage traverse motor. Carriage (Blade Drive Motor) Switch - LS-7 (835) (a) (5) Supplies power to all circuits. Start Cycle Switch - LS-3 (700) (a) (3) Refer to Figures 1 through 3 in this chapter, and Figures 1-1 through 1-7 in the Troubleshooting chapter of this manual. The carriage (blade drive motor) switch stops the blade drive motor when the carriage moves aft. Carriage Forward Stop Switch - LS-4 (300) (not shown) (a) Stops forward movement of the carriage. (b) Provides power to the roller head drive motor. (c) Trips the contact relays, which in turn starts the blade drive motor. (d) Trips the air solenoid (130), which in turn allows pressure to be applied. Roller Motor Forward Direction Limit Switch - LS-5 (300) (under head cover) (a) Limits travel of the roller head in reverse direction. NOTE: (7) (8) Reverse direction is the direction in which the roller head moves at the beginning of the rolling cycle. Carriage Return Switch - LS-1 (830) (a) The carriage return switch is positioned on the roller support arm and is activated when the roller body makes contact, closing the switch. (b) When the switch is closed, power is provided to the carriage traverse motor, starting the carriage return. Roller Motor Aft Direction Limit Switch - LS-6 (315) (under head cover) (a) As the roller completes its arc, the roller motor aft direction switch limits and stops the travel of the roller head by cutting power to the roller head drive motor. DESCRIPTION AND OPERATION 61-00-28 Page 6 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 TROUBLESHOOTING - CONTENTS 1. Troubleshooting Guide...........................................................................................1-10 A. Roll Sample Quality.......................................................................................... 1-10 B. Applied Load Measurement............................................................................. 1-11 C. Air Bleed-off Time/Distance.............................................................................. 1-11 D. Air/Hydraulic Booster (410).............................................................................. 1-11 E. Hydraulic Hose................................................................................................. 1-12 F. Roller (1120)..................................................................................................... 1-12 G. F.R.L. Unit (1330)............................................................................................. 1-12 H. Air Valve (230).................................................................................................. 1-13 I. Machine Functional Conditions........................................................................ 1-13 LIST OF ILLUSTRATIONS Relay Placement Pins................................................................... Figure 1-1......................1-3 Switches - Step 1.......................................................................... Figure 1-2......................1-4 Switches - Step 2.......................................................................... Figure 1-3......................1-5 Switches - Step 3.......................................................................... Figure 1-4......................1-6 Switches - Step 4.......................................................................... Figure 1-5......................1-7 Switches - Step 5.......................................................................... Figure 1-6......................1-8 Switches - Step 6.......................................................................... Figure 1-7......................1-9 TROUBLESHOOTING 61-00-28 Page 1-1 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (Blank Page) TROUBLESHOOTING 61-00-28 Page 1-2 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 5 6 7 4 8 3 9 2 1 11 10 Relay 1 4 5 3 6 2 7 1 8 W10516 Relay 2 Relay Placement Pins Figure 1-1 TROUBLESHOOTING 61-00-28 Page 1-3 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 Step 1 • Main Power Switch Activated Carriage Stop Switch Carriage Return Switch LS(2) LS(1) Black SOL (1) 11 1CR 8 7 6 1CR .68 uf Red M 2 Carriage Return Motor (1280) M 3 Roller Head Motor (500) M 1 Right Angle Gear Motor (390) Blue 2 CR Main Power Switch 7 2 1CR 2 10 Start Cycle LS (3) Carriage Adv. Switch 3 1 LS (4) 1CR Roller Shut Off Black LS (5) Red Roller Shut Off 2 CR Blue LS (6) Blade Drive Motor Switch 1 4 2 CR LS (7) W10517 120 Vac 2 Switches - Step 1 Figure 1-2 TROUBLESHOOTING 61-00-28 Page 1-4 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 Step 2 • Start Switch Activated • 1CR and 2 CR Energized • Carriage Return Motor (1280) activated (Moves toward the butt of the blade) • Roller Head Motor (500) Activated (Rotates toward start position) Carriage Stop Switch Carriage Return Switch LS(2) LS(1) Black SOL (1) .68 uf 11 1CR 8 7 6 1CR Red M 2 Blue Carriage Return Motor (1280) 2 CR Main Power Switch 7 2 1CR 10 2 Start Cycle LS (3) Carriage Adv. Switch 3 LS (4) 1CR 1 Roller Shut Off Black LS (5) Red Roller Shut Off 2 CR M 3 Blue LS (6) Roller Head Motor (500) Blade Drive Motor Switch 1 4 2 CR LS (7) M 1 Right Angle Gear Motor (390) W10518 120 Vac 2 Switches - Step 2 Figure 1-3 TROUBLESHOOTING 61-00-28 Page 1-5 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 Step 3 • Roller Shut Off Switch LS (6) opens (Roller head stops) • Carriage continues to move Carriage Stop Switch Carriage Return Switch LS(2) LS(1) Black SOL (1) .68 uf Red 11 1CR 8 7 6 1CR M 2 Carriage Return Motor (1280) M 3 Roller Head Motor (500) M 1 Right Angle Gear Motor (390) Blue 2 CR 2 Main Power Switch 1CR 10 Start Cycle LS (3) Carriage Adv. Switch 3 1 LS (4) 1CR Roller Shut Off Black LS (5) Red Roller Shut Off 2 CR Blue LS (6) Blade Drive Motor Switch 1 4 2 CR LS (7) W10519 120 Vac 2 2 7 Switches - Step 3 Figure 1-4 TROUBLESHOOTING 61-00-28 Page 1-6 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 Step 4 • Carriage rolls over blade drive motor switch LS (7) (Holds it closed) (Right Angle Gear Motor (390) still is not activated because the contacts 1/4 off 2CR are still open) • LS (4) is made • 1 and 2CR contacts are deactivated Carriage • Right Angle Gear Motor (390) is activated and Stop starts roller motor in the opposite direction Switch • Carriage stops • Solenoid (1) is activated (Air valve opens, roller applies load to the blade) LS(2) Carriage Return Switch LS(1) Black 7 .68 uf Red SOL (1) 11 1CR 8 6 1CR M 2 Carriage Return Motor (1280) M 3 Roller Head Motor (500) M 1 Right Angle Gear Motor (390) Blue 2 CR Main Power Switch 7 2 1CR 2 10 Start Cycle LS (3) Carriage Adv. Switch 3 LS (4) 1CR 1 Roller Shut Off Black LS (5) Red Roller Shut Off 2 CR Blue LS (6) Blade Drive Motor Switch 1 4 2 CR LS (7) W10520 120 Vac 2 Switches - Step 4 Figure 1-5 TROUBLESHOOTING 61-00-28 Page 1-7 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 Step 5 • LS (1) is activated (Starts the carriage in aft direction) • LS (5) is opened (Shuts off the Roller Head Motor [500]) • The mechanical air switch is activated (releases air pressure) Carriage Stop Switch Carriage Return Switch LS(2) LS(1) Black SOL (1) 11 1CR 8 7 6 1CR .68 uf Red M 2 Carriage Return Motor (1280) M 3 Roller Head Motor (500) M 1 Right Angle Gear Motor (390) Blue 2 CR 120 Vac 7 2 1CR 10 2 Start Cycle LS (3) Carriage Adv. Switch 3 1 LS (4) 1CR Roller Shut Off Black LS (5) Red Roller Shut Off 2 CR Blue LS (6) Blade Drive Motor Switch 1 4 2 CR LS (7) W10521 Main Power Switch 2 Switches - Step 5 Figure 1-6 TROUBLESHOOTING 61-00-28 Page 1-8 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 Step 6 • Carriage comes off LS 7 (Blade drive motor is off) • Carriage stop switch opens (Carriage Return Motor [1280] is off) Carriage Stop Switch Carriage Return Switch LS(2) LS(1) Black SOL (1) 11 8 7 1CR .68 uf Red 6 1CR M 2 Blue Carriage Return Motor (1280) 2 CR 2 7 1CR 10 2 Start Cycle 2 Main Power Switch LS (3) Carriage Adv. Switch LS (4) 3 Roller Shut Off 1 1CR Black LS (5) Red Roller Shut Off 2 CR M 3 Blue LS (6) Roller Head Motor (500) Blade Drive Motor Switch 1 4 2 CR LS (7) M 1 Right Angle Gear Motor (390) W10522 120 Vac Switches - Step 6 Figure 1-7 TROUBLESHOOTING 61-00-28 Page 1-9 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 1. Troubleshooting Guide The purpose of this guide is to help isolate probable causes and suggest possible remedies for some of the more common rolling machine service conditions and problems. In all cases, the remedy for a condition or problem should follow the procedures detailed in the applicable section of this manual. Condition CAUTION: A. Probable Cause Remedy CORRECT BLADE SHANK PREPARATION IS A KEY FACTOR FOR PERFORMING A SUCCESSFUL ROLL. PLEASE TAKE THE TIME TO PREPARE THE BLADE SHANK CORRECTLY BEFORE ROLLING. Roll Sample Quality (1) (2) Abrupt Transition Dragging or Galling Bleed-off time is out of adjustment. Set the bleed-off time in accordance with the Machine Setup and Testing chapter of this manual. Flow control valve (20) malfunctioning. Replace the valve in accordance with the Repair and Replace chapter of this manual. Roller bearing full of dirt or oil. Clean bearings. Worn roller bearing. Replace roller bearing in accordance with the Repair and Replace chapter of this manual. (3) Ticking marks on the blade shank after roll. Surface of the roller wheel has imperfections or metal fragment in it. Replace the roller wheel in accordance with the Repair and Replace chapter of this manual. (4) Waviness on the blade shank after roll Bearing is not centered on roller arm. Make sure shims are properly installed. Apply adhesive (CM74) on the roller/bearing seat interface. (5) Wrinkle effect on the blade shank after roll. Excessive load, excessive pillow block bearing play, roller wheel surface distortion, roller wheel bearing is worn, or restricted carriage movement. Perform appropriate checks/ adjustments as required. NOTE: Blades with multiple overhauls may require extra attention. Often, if the blade is above minimum, a successful roll can be accomplished with careful pre-roll preparation. TROUBLESHOOTING 61-00-28 Page 1-10 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 B. Condition Probable Cause Remedy Applied Load Measurement (1) Cannot achieve the required load Air/Hydraulic Booster is not functioning properly. Refer to 5. Air/Hydraulic Booster, in this chapter. Air pockets in the hydraulic line Refer to 6. Hydraulic Hose, in this chapter. Insufficient line air pressure input Refer to 5. Air/Hydraulic Booster, in this chapter. C. Air Bleed-off Time/Distance (1) Cannot obtain the required bleed-off time/ distance. Flow control valve (20) malfunction or misadjustment. Adjust the bleed-off time in accordance with the Machine Setup and Testing chapter of this manual. If required, replace the flow control valve in accordance with the Repair and Replace chapter of this manual. D. Air/Hydraulic Booster (410) (1) (2) Roller arm does not extend when air switch (130) is actuated. Roller arm extends but can be easily pushed back by hand. Input air is not connected to the regulator. Connect the air supply. Regulator valve is not open. Open the regulator valve. The plumbing is routed incorrectly. Inspect the plumbing as required. Air is trapped in the hydraulic lines. Inspect the booster mounting and bleed the lines accordingly. Lack of oil supply. Inspect the oil level and add oil as required. Low air pressure. Inspect the pressure. Defective seals, or oil leak. Install a new seal kit in accordance with the Repair and Replace chapter in this manual, or send the booster to the vendor for factory repair. TROUBLESHOOTING 61-00-28 Page 1-11 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 D. E. Condition Remedy Air/Hydraulic Booster (410), continued (3) Oil flowing out of the reservoir. (4) Air flowing out of vent port Defective air cylinder seals. while roller arm is fully extended. Install a new seal kit in accordance with the Repair and Replace chapter in this manual, or send the booster to the vendor for factory repair. (5) Slow bleed-off with flow control valve (20) open. Dirty filter. Clean or replace the filter. (6) Excessive oil consumption. Internal oil leakage. Install a new seal kit in accordance with the Repair and Replace chapter in this manual, or send the booster to the vendor for factory repair. Defective valve or o-ring. Install a new seal kit in accordance with the Repair and Replace chapter in this manual, or send the booster to the vendor for factory repair. Air pockets in the hydraulic line. Repeat the air bleed procedure in accordance with the Machine Setup and Testing chapter of this manual. Bearing failure. Replace the bearing. Imperfections in the roller surface. Replace the roller. Roller surface is worn. Replace the roller. Shims are worn. Replace the shims. Roller bearing clogged with oil and dirt residue. Clean the roller bearing. Hydraulic Hose (1) F. Probable Cause Not achieving full pressure/load requirements. Roller (1120) (1) Roller drags across the blade surface. NOTE: Non-fluid lubrication causes less dirt/oil buildup than vegetable based oil. G. F.R.L. Unit (1330) (1) Lack of hydraulic pressure. Malfunctioning F.L.R. unit. TROUBLESHOOTING Repair or replace the F.L.R. unit in accordance with the Repair and Replace chapter of this manual. 61-00-28 Page 1-12 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 H. I. Condition Probable Cause Remedy Air Valve (230) (1) Roller arm will not extend. Faulty air valve (230). Replace the air valve in accordance with the Repair and Replace chapter of this manual. (2) Air valve (230) does not actuate. Faulty solenoid (1). Inspect the wiring in accordance with Figure 1-1 and Figure 1-5. Replace the solenoid (1) if required. Faulty wiring. Inspect the wiring and operational position (open/closed) of the switches in accordance with Figure 1-1 and Figure 1-2. Defective Main power switch (690). Replace the main power switch (690) if required. Faulty wiring. Inspect the wiring and operational position (open/ closed) of the switches in accordance with Figure 1-1 thru Figure 1-3. Defective start cycle switch (700). Replace the start cycle switch (700). Machine Functional Conditions (1) (2) (3) Rolling machine does not start when the main power switch (690) is turned on. Start cycle switch (700) does not actuate when the Main power switch (690) is on. Carriage (1010) does not Faulty wiring. move when the start cycle switch (700) is activated. Inspect the wiring in accordance with Figure 1-1 and Figure 1-3. Defective start cycle switch (700). Replace the start cycle switch (700). Defective Carriage return motor (1280). Replace the Carriage return motor (1280) and perform setup and check procedures in accordance with the Machine Set-Up and Testing chapter of this manual. Loose set screws on shaft of the 1 RPM motor, or bent shaft. Tighten the set screws on the shaft of the 1 RPM motor. Straighten the shaft if required. TROUBLESHOOTING 61-00-28 Page 1-13 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 I. Condition Probable Cause Remedy Machine Functional Conditions, continued (4) (5) (6) (7) Roller head motor (500) does not activate. The roller head motor (500) is activated, but the roller head does not stop. Carriage stops before completing its cycle. Right Angle Gear Motor (390) does not activate. Faulty wiring. Inspect the wiring in accordance with Figure 1-1 and Figure 1-3. Defective start cycle switch (700). Replace the start cycle switch (700). Defective roller head motor (500). Replace the roller head motor (500) and perform setup and check procedures in accordance with the Machine Set-Up and Testing chapter of this manual. Faulty wiring. Inspect the wiring in accordance with Figure 1-1 and Figure 1-4. Loose set screws on shaft of the 1 RPM motor. Tighten the set screws on the shaft of the 1 RPM motor. Faulty wiring. Inspect the wiring in accordance with Figure 1-1 and Figure 1-4. Defective limit switch (6). Replace limit switch (6) if required. Faulty wiring. Inspect the wiring in accordance with Figure 1-1 and Figure 1-4. Defective limit switch (6). Replace limit switch (6) if required. Faulty wiring. Inspect the wiring in accordance with Figure 1-1 and Figure 1-5. Defective limit switch (7) or limit switch (4). Replace limit switch(s) as required. Refer to Figure 1-5. TROUBLESHOOTING 61-00-28 Page 1-14 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 I. Condition Probable Cause Remedy Machine Functional Conditions, continued (8) Roller does not apply pressure to blade. Defective solenoid (1). Replace solenoid (1). Refer to Figure 1-5. Air flow control valve (20) malfunction. Inspect and adjust the bleed-off time in accordance with the Machine Setup and Testing chapter of this manual. If required, replace the flow control valve (20) in accordance with the Repair and Replace chapter of this manual and perform setup and check procedures in accordance with the Machine Set-Up and Testing chapter of this manual. After completing the blade shank roll, the carriage does not move back in the aft direction. Defective limit switch (1). Replace limit switch (1). Refer to Figure 1-6. (10) Roller head motor (500) does not shut off after completing the roll cycle. Defective limit switch (5). Replace limit switch (5). Refer to Figure 1-6. (11) Air pressure is not released when the machine shuts off. Flow control valve (20) malfunction. Replace the flow control valve (20) in accordance with the Repair and Replace chapter of this manual and perform setup and check procedures in accordance with the Machine Set-Up and Testing chapter of this manual. (9) (12) Right Angle Gear Defective limit switch (7). Motor (390) does not shut off after the roller head motor shuts off. Replace limit switch (7). Refer to Figure 1-7. (13) Carriage Return Motor (1280) does not shut off after the roller head motor shuts off. Replace limit switch (7). Refer to Figure 1-7. Defective limit switch (7). TROUBLESHOOTING 61-00-28 Page 1-15 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (Blank Page) TROUBLESHOOTING 61-00-28 Page 1-16 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 MAINTENANCE AND CHECKS - CONTENTS 1. Routine Maintenance and Checks............................................................................2-4 2. Mandatory Maintenance for Option 2: On Condition Maintenance of the DT-1724-3(F) Rolling Machine.......................................................................2-4 A. Annual Maintenance and Checks.......................................................................2-4 B. Biennial Maintenance and Checks......................................................................2-5 C. Periodic Maintenance and Checks .....................................................................2-5 LIST OF TABLES Approved Lubricants Versus Ambient Conditions......................... Table 2-1.......................2-3 MAINTENANCE AND CHECKS 61-00-28 Page 2-1 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (Blank Page) MAINTENANCE AND CHECKS 61-00-28 Page 2-2 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 Approved lubricants.xls AMBIENT TEMPERATURE LUBRICANT VISCOSITY GROUP VS. OUTPUT SHAFT SPEED UP TO 300 RPM OVER 300 RPM -65°F TO 0°F 318.59 --- -45°F TO +20°F 318.60 318.59 -5°F TO +55°F 318.61 318.60 +15°F TO +110°F 318.62 318.62 +100°F TO +165°F 318.63 318.63 VISCOSITY GROUP AMOCO OIL COMPANY AMOCO PERMAGEAR AMOCO 318.59 318.60 318.61 318.63 EP460 WORM GEAR OIL ATLANTIC RICHFIELD ARCO MINERAL GEAR OIL S.A.E. CARR OIL COMPANY LUB 733 DARMEX INDUSTRIAL CORP. GEAR BOX OIL DUBOIS CHEMICAL CO. E.G.O. EXXON CYLESSTIC FISKE BROTHERS LUBRIPLATE APG GULF OIL COMPANY TRANSGEAR LUBE E.F. HOUGHTON CO. MP GEAR OIL 90 140 EP140 DX-9140 EP90 EP140 TK460 90 140 EP90 EP140 90 KEYSTONE LUBE CO. MOBIL OIL CORP. SHC-600 SERIES 140 WG-A SHC-629* SHC-600 SERIES AVREX SHC-629* SHC-634* SHC-634 SHC-636 904 MOBILFLUID 423 CYLINDER OIL 600W EXTRA HECLA PHILLIPS PETROLEUM PHILUBE SHELL OIL CO. AEROSHELL FLUID TEXACO VANGUARD ULTRACHEM, INC. CHEMLUBE 4 ISO OR A.G.M.A. ISO 15 VISCOSITY GRADE 318.62 SUPER CYLINDER 90 140 5-L 460 140* ISO 46 ISO 320 ISO 460 ISO 680 AGMA 1 AGMA 5 AGMA 7 AGMA 8 * Viscosity of these oils is actually less than the listed ISO or A.G.M.A. grade. Approved Lubricants Versus Ambient Conditions Table 2-1 MAINTENANCE AND CHECKS 61-00-28 Page 2-3 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 1. Routine Maintenance and Checks NOTE: Refer to the section, "Routine Maintenance and Checks" in the Appendix D Rolling Machine chapter of Hartzell Propeller Inc. Aluminum Blade Overhaul Manual 133C (61-13-33) for routine maintenance and check procedures required to be performed on the rolling machine. 2. Mandatory Maintenance for Option 2: On Condition Maintenance of the DT-1724-3(F) Rolling Machine NOTE 1: Maintenance and Checks procedures must be performed if your repair facility is operating under Option 2: On condition maintenance of the DT-1724-3(F) Rolling Machine. NOTE 2: For an explanation of options and requirements necessary to obtain a compression rolling approval, refer to the section, "Compression Rolling Authorization in the Approved Facilities" chapter of Hartzell Propeller Inc. Standard Practices Manual 202A (61-01-02). A. Annual Maintenance and Checks (1) Applied Load Check (a) (2) Main Journal Bearings (Pillow Blocks) (660, 680) (a) (3) Annually, perform an applied load check in accordance with the Machine Setup and Testing chapter of this manual. Annually, check the amount of play in the main journal bearings. 1 Put an indicator on the outside diameter of the face plate (360). 2 Using a hand force of approximately 5 to 10 pounds, move the fixture (340) up and down, while watching the indicator. 3 The maximum permitted displacement is 0.003 inch (0.076 mm). If the total displacement exceeds 0.003 inch (0.076 mm), replace the main journal bearings. Motor Gear Box CAUTION: USE ONLY THE APPROVED LUBRICANTS LISTED IN TABLE 2-1 OF THIS CHAPTER. (a) Annually, check the lubricant level in the motor gear box. (b) Add lubricant as required. Refer to Table 2-1 in this chapter for approved lubricants. NOTE: The level plug is just below the drive shaft. MAINTENANCE AND CHECKS 61-00-28 Page 2-4 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (4) Pressure Gauge Inspection CAUTION: (a) (5) The pressure gauge must be calibrated and certified annually. Roller Wheel Inspection (a) (6) ANNUAL CALIBRATION AND CERTIFICATION OF THE PRESSURE GAUGE IS REQUIRED. Annually measure the OD of the roller wheel with a micrometer. (1) The minimum diameter permitted for use is 1.9985 inch (50.761 mm). (2) If the roller wheel does not meet the minimum diameter, replace the roller wheel in accordance with the Repair and Replace chapter of this manual. Pillow Block Assemblies (660, 680) CAUTION 1: DO NOT OVER LUBRICATE THE PILLOW BLOCK ASSEMBLIES (660, 680). EXCESSIVE LUBRICATION CAN CAUSE THE SEALS TO FAIL PREMATURELY. CAUTION 2: USE OF AIRCRAFT HYDRAULIC FLUID (MIL-H-5606) IS NOT PERMITTED. (a) Annually lubricate the pillow block assemblies with a high quality bearing lubricant. B. Biennial Maintenance and Checks (1) Motor Gear Box (a) Check the lubricant in the motor gear box for contamination. C. Periodic Maintenance and Checks (1) Motor Gear Box (a) Every 500 hours (approximately 6000 blade cycles), perform the following steps: 1 Completely drain the lubricant from the motor gear box. 2 Flush the gear box with mineral spirits. 3 Replace the lubricant in the motor gear box with approved lubricant (Table 2-1). MAINTENANCE AND CHECKS 61-00-28 Page 2-5 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (Blank Page) MAINTENANCE AND CHECKS 61-00-28 Page 2-6 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 REPAIR AND REPLACE - CONTENTS 1.. General Component Replacement.................................................................................3-3 2.. Component Replacement Instructions............................................................................3-6 A. Air/Hydraulic Oil Booster (410) Replacement...........................................................3-6 B. Hydraulic Hose (670) Replacement..........................................................................3-7 C. Pressure Gauge (420) Replacement........................................................................3-8 D. Roller (1120) Replacement........................................................................................3-8 E. F.R.L. Unit (1330) Replacement................................................................................3-8 F. Air Valve (230) Replacement.....................................................................................3-8 G. Main Power Switch (690)/Start Cycle Switch (700) Replacement............................3-9 H. Flow Control Valve (20) Replacement.......................................................................3-9 I. Air Switch (130) Replacement...................................................................................3-9 J. Air Control Arm (100) Replacement..........................................................................3-9 K. Link Arm (150) Replacement...................................................................................3-10 L. Limit Switch LS-4 (300)...........................................................................................3-10 M. Limit Switch LS-5 or LS-6 (315).............................................................................. 3-11 N. Fixture (340)............................................................................................................ 3-11 O. Face Plate Weldment (360).....................................................................................3-12 P. Right Angle Gear Motor (390).................................................................................3-13 Q. Roller Head Motor (500)..........................................................................................3-13 R. Carriage Drive Motor (1280)...................................................................................3-14 S. Pillow Blocks (660, 680)..........................................................................................3-15 T. Carriage Switch (830).............................................................................................3-16 U. O-ring (970).............................................................................................................3-16 V. Bearing (1130).........................................................................................................3-17 REPAIR AND REPLACE 61-00-28 Page 3-1 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 LIST OF FIGURES Locking Collars on Shaft of Face Plate......................................... Figure 3-1....................3-12 LIST OF TABLES Direct Replacement Parts............................................................. Table 3-1.......................3-4 Parts Requiring Setup or Checks After Replacement................... Table 3-2.......................3-5 Parts Replaced by Hartzell Propeller Inc. Only............................. Table 3-3.......................3-5 REPAIR AND REPLACE 61-00-28 Page 3-2 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 1. General Component Replacement A. General Information (1) Refer to the Illustrated Parts List chapter of this manual for a complete description of each component and illustrations that reference the entire DT-1724-3(F) parts list. (2) Replacement of parts often requires setup adjustments and checks, as specified. Refer to the Machine Setup and Testing chapter of this manual for specific tests and checks. (3) Parts listed in Table 3-1 may be replaced when necessary. These parts do not affect the setup of the machine and, therefore, do not require setup tests, checks, and/or calibration procedures to be performed after they are replaced. (4) Parts listed in Table 3-2 may affect the original setup of the machine. If one of these parts is replaced, the appropriate setup tests, checks, and/or calibration procedures must be performed in accordance with the Machine Setup and Testing chapter of this manual before additional blade shanks are rolled. (5) Parts listed in Table 3-3 can only be replaced by Hartzell Propeller Inc. If replacement of one of these parts is necessary, return the entire rolling machine to Hartzell Propeller Inc. for repair. NOTE: (6) A machine returned to Hartzell Propeller Inc. for repair will be overhauled as required. If replacement of a manufactured part is necessary, contact Hartzell Propeller Inc. to obtain the current print. NOTE: Manufactured parts are identified by the letter "M" in the Procurement Source column of the Illustrate Parts list of this manual. REPAIR AND REPLACE 61-00-28 Page 3-3 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 FIG./ITEM NUMBER 30 140 160 230 240 250 260 310 330 380 385 400 690 700 730 770 880 910 1090 1100 1180 1240 1250 1260 1270 -1290 -1300 1330 1360 1370 -1450 1470 1480 -1490 -1520 -1530 -1600 -1610 -1620 -1630 -1640 PART NUMBER NOMENCLATURE UPA FITTING FITTING TUBING, AIR AIR VALVE STEEL PIPE NIPPLE (MCMASTER CARR) PIPE SUPPORT BRACKET UNION 1/4" BLACK (MCMASTER-CARR) COLLET Y-SHANK SPACER COUPLING COUPLING INSERT RELAY MOUNTING PLATE MAIN POWER SWITCH START CYCLE SWITCH CARRIAGE SWITCH TRANSFORMER HANDLE ROLLER HEAD COVER SPACER SPACER MUFFLER RELAY (SQUARE-D CLASS 8501 TYPE KP-12-V208501) RELAY (SQUARE-D CLASS 8501 TYPE KP-13-V208501) HOSE CLAMP FITTING MUFFLER OVERLOAD RELAY F.R.L. UNIT SPACER, FACEPLATE BOOSTER MOUNTING PLATE HOSE CLAMP RELAY SOCKET RELAY SOCKET WIRE AND PLUG ASSEMBLY EXPANSION SLEEVE EXPANSION SLEEVE COLLET SCREW E-SHANK COLLET E-SHANK SPACER ADAPTOR USAGE CHART MV-SHANK SPACER 1 2 3 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 4 1 1 1 1 1 1 1 1 1 2 B-500-1-4 S-500-2-2 55-P-5/16 POLY-FL DT-1724+23 44615K482 DT-1724+25 44605k192 AC-602 DT-1724+33 FC15 X 3/4" XFCR-15 X 3/4" DT-1724+40 2510 FG-2 BZV6-2RN BZ-2RDS5551-A2 GSD1500 DT-1724+88 DT-1724+91 AST-2868 BST-2872 4604-0004 NONE NONE B-3857-WCJ15 B-500-2-4 4602-0002 A985 CO2-02-000 DT-1724+136 DT-1724+137 555443 NR-52 NR-62 37F3290 BST-2866 BST-2866-1 DT-1724+160 DT-1724+161 DT-1724+162 DT-1724+163 DT-1724+164 Direct Replacement Parts Table 3-1 REPAIR AND REPLACE 61-00-28 Page 3-4 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 FIG./ITEM NUMBER 20 100 130 150 300 305 315 340 360 390 410 420 660 670 680 830 835 970 1120 1130 1280 PART NUMBER NOMENCLATURE F20B DT-1724+10 03-0293-22 DT-1724+15 BZ-2RW8225551-A2 DT-1724+30A DT-1724+30 AC-5610 DT-1724+36 DT-1724+39 DT-1724+41 G-2516L PB900X-1 7/16 BORE 919-4 X 54" PB221-1 7/16 BZ-2RW8299-A2 BZ-2RW8299-A2 C-3317-113 DT-1724+112 DT-1724+113 T2602-001 FLOW CONTROL VALVE AIR CONTROL ARM AIR SWITCH LINK ARM LIMIT SWITCH SWITCH COVER LIMIT SWITCH (ROLLER AFT DIRECTION) FIXTURE FACE PLATE WELDMENT RIGHT ANGLE GEAR MOTOR AIR-OIL BOOSTER GAGE PILLOW BLOCK HYDRAULIC HOSE PILLOW BLOCK CARRIAGE SWITCH CARRIAGE SWITCH (FOR BLADE DRIVE MOTOR) O-RING ROLLER BEARING CARRIAGE RETURN MOTOR UPA 1 1 1 1 2 6 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 Parts Requiring Setup or Checks After Replacement Table 3-2 FIG./ITEM NUMBER 50 70 80 180 190 200 740 760 800 920 930 940 960 980 1010 1040A 1050 1060 1110 1220 1350 1380 PART NUMBER DT-1724+5 DT-1724+7 DT-1724+8 DT-1724+18 DT-1724+19 DT-1724+20 DT-1724+74 SW20UU DT-1724+80 DT-1724+92 DT-1724+93 DT-1724+94 DT-1724+96 DT-1724+98 DT-1724+101 DT-1724+104A DT-1724+104 DT-1724+106 DT-1724+111 DT-1724+122 DT-1724+135 B-1612 NOMENCLATURE UPA BUSHING WORM GEAR ASSEMBLY, ROLLER HEAD WORM GEAR ASSEMBLY, CARRIAGE ADVANCE WORM WORM GEAR BRACKET DRIVE SHAFT SHAFT - 1.2495/1.2490 DIA. X 13.00 BST-4051 BEARING SUPPORT BLOCK WORM HOUSING BUSHING BLOCK SUPPORT FRAME SPRING PISTON CARRIAGE SHAFT SUPPORT BLOCK SHAFT SUPPORT BLOCK PIVOT BLOCK ROLLER ARM SWITCH MOUNTING BRACKET DRIVE SHAFT NEEDLE BEARING 2 1 1 2 1 1 2 4 1 1 1 1 1 1 1 3 1 1 1 1 1 2 Parts Replaced by Hartzell Propeller Inc. Only Table 3-3 REPAIR AND REPLACE 61-00-28 Page 3-5 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 2. Component Replacement Instructions A. Air/Hydraulic Oil Booster (410) Replacement CAUTION: HARTZELL PROPELLER INC. WILL SUPPORT THE DESTACO DESIGN BOOSTER COMPONENTS ONLY. (1) Disconnect the air supply if applicable. (2) If replacing an obsolete booster model, remove the existing booster and mounting hardware. (3) If the machine was built before March, 1999, it will not have the proper mounting holes for the booster support (1370) required for installation of the Destaco booster. Drill mounting holes as follows: (4) (a) Drill and tap two 5/16-18 UNC-2B holes, 0.88 inch (22.4 mm) deep, on the end of the motor mounting block (370). (b) Space the holes 3.00 inches (76.2 mm) apart, 1.250 inches (31.8 mm) from the top, and 0.50 inch (12.7 mm) from the back edge of the motor mounting block (370). Install a new Destaco booster on the machine. (a) Using booster mounting plate (1370). (b) Position the unit so the 0.25 inch (6.4 mm) port is facing the F.R.L. unit (1330). (5) Connect the gauge (420) to the front port using an elbow (430). (6) Connect the muffler (1180) to the 0.25 inch (6.4 mm) port. (7) Before connecting the hydraulic line, fill the hose and the output port of the booster with the appropriate hydraulic oil (Table 2-1). This will reduce the volume of trapped air. (8) Connect one end of the hydraulic hose (670) to the booster outlet port. Connect the other end of the hose to the pivot block (1060) inlet port. (9) Before filling the booster with oil, open the air bleed fitting that is located opposite the oil inlet on the pivot block. (10) Remove the reservoir pipe plug and fill the reservoir with hydraulic oil until oil comes out of the air bleed connection fitting in the pivot block (1060). (11) Bleed the air from the booster before pressure is applied to the system. (a) Depress the booster valve by pushing down on the valve rod located inside the reservoir. (b) Apply air pressure through the air switch (130) into the booster. (c) Repeat steps (11)(a) and (11)(b) until all the air has escaped. REPAIR AND REPLACE 61-00-28 Page 3-6 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 CAUTION: DO NOT USE BRAKE FLUID TO FILL THE OIL RESERVOIR. USE ONLY MOBILE DTE 24, SHELL TELLUS 23, CHEVRON EP22, PRO-COOL AW 46, OR ATF. (12) Fill the oil reservoir to the appropriate level, using approved oil only. NOTE: The booster is self-purging. Check the reservoir seal when filling the system with oil. (13) Perform an applied load measurement in accordance with the Machine Setup and Testing chapter of this manual. B. Hydraulic Hose (670) Replacement (1) Disconnect the air supply if applicable. CAUTION: PREVENT OIL FROM DRAINING OUT OF THE RESERVOIR WHEN DISCONNECTING THE HYDRAULIC LINE. (2) Disconnect the hydraulic line at the pivot block and booster. (3) Place a container below the pivot block under the bleed screw (1400) to catch the oil. (4) Remove the bleed screw (1400) and permit all oil to drain out of the reservoir. (5) Disconnect the hose at the pivot block fitting. (6) Attach a new hose at the pivot block. (7) Insert the bleed screw (1400) back into the pivot block, but do not tighten it. (8) Force the hydraulic oil into the hose until the hose is filled. (9) Tighten the bleed screw (1400). (10) Remove the plug device from the booster fitting. CAUTION: BE CAREFUL NOT TO PERMIT OIL TO ESCAPE WHEN ATTACHING THE HYDRAULIC HOSE TO THE BOOSTER FITTING. (11) Attach the hydraulic hose to the booster fitting. (12) Turn the bleed screw to permit air to escape from the system. (13) After permitting air to escape from the system, tighten the bleed screw. (14) Connect the air pressure line to the F.R.L. unit (1330). (15) Check the hydraulic pressure. (16) Perform an applied load measurement in accordance with the Machine Setup and Testing chapter of this manual. (17) Repeat steps (12) through (16) of this procedure, if necessary. REPAIR AND REPLACE 61-00-28 Page 3-7 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 C. Pressure Gauge (420) Replacement CAUTION: USE CARE NOT TO PERMIT HYDRAULIC OIL TO ESCAPE WHEN CHANGING THE GAUGE. (1) Disconnect the air supply, if applicable. (2) Remove the gauge (420) from the booster. (3) Install a new calibrated gauge (420) (4) Perform an applied load measurement in accordance with the Machine Setup and Testing chapter of this manual. D. Roller (1120) Replacement NOTE: Replace the dowels as required. (1) Remove the dowel (600). (2) Remove the roller arm assembly. (3) Remove the dowel (790). (4) Remove the shims (810) and roller (1120). (5) Replace the roller (1120). (6) Reassemble the machine. NOTE: Dowels (600, 790) are reusable as long as an interference fit is maintained. (7) Perform an applied load measurement in accordance with the Machine Setup and Testing chapter of this manual. (8) Roll a test specimen in accordance with Rolling the Y-shank Test Specimen section of the Machine Setup and Testing chapter of this manual. (9) Evaluate the test specimen in accordance with the Evaluation of Test Specimen section of the Machine Setup and Testing chapter of this manual. E. F.R.L. Unit (1330) Replacement (1) Disconnect the F.R.L. unit at a union (260). (2) Change the fittings over to the new F.R.L. unit. (3) Connect the new F.R.L. unit at the union (260). F. Air Valve (230) Replacement (1) Disconnect the plumbing and fasteners that attach the air valve (230). (2) Remove the valve (230). (3) Connect the new valve (230) and secure it with mounting fasteners. REPAIR AND REPLACE 61-00-28 Page 3-8 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 G. Main Power Switch (690)/Start Cycle Switch (700) Replacement (1) Disconnect the wiring to the switch. (2) Remove all fastening hardware. (3) Connect the new switch and secure it with appropriate mounting hardware. H. Flow Control Valve (20) Replacement (1) Disconnect the flow control valve (20) (2) Replace and connect the new valve (20). (3) Perform a bleed-off check procedure in accordance with the Machine Setup and Testing chapter of this manual. I. Air Switch (130) Replacement (1) Disconnect the plumbing from the air switch (130). (2) Remove the mounting hardware. (3) Replace and connect the new air switch. NOTE: If your machine was built before 2002, replacement hardware will be different from existing hardware. J. Air Control Arm (100) Replacement NOTE: Replacement of the air control arm (100) should not be necessary unless the air switch (130) is replaced. (1) Remove the mounting hardware. (2) Remove the actuator screw and nut. (3) Attach the screw and nut to the new control arm. (4) Attach the new air control arm (100) to the carriage. (5) Approximate the position of the air control arm (100) and secure it. (6) Perform setup procedure in accordance with the Machine Setup and Testing chapter of this manual and adjust as necessary. REPAIR AND REPLACE 61-00-28 Page 3-9 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 K. Link Arm (150) Replacement (1) Remove the shoulder screw. (2) Remove the link arm (150). (3) Visually inspect the shoulder screw and dowel pin in the carriage drive assembly for excessive wear. Replace as required. (4) Install a new link arm (150) on the carriage drive dowel. (5) Move the carriage to align the shoulder screw hole with the link arm. (6) Install the shoulder screw (1210). (7) Perform setup and check procedures in accordance with the Machine Setup and Testing chapter of this manual. L. Limit Switch LS-4 (300) (1) Remove the shoulder screw (1210) from the carriage. (2) Remove the shoulder screw (1170) from the mounting block (170). (3) Move the carriage drive assembly aside to gain access to the switch mounting screws. (4) Disconnect the wiring to the switch. (5) Remove the limit switch mounting screws. (6) Remove the limit switch (300). (7) Connect the wires to the new switch (300). (8) Fasten the limit switch (300) to the bracket (1220) with mounting screws. (9) Use a straight edge to verify that the mounting screws do not protrude above the top surface of the mounting block (170). CAUTION: THE HEADS OF THE SWITCH MOUNTING SCREWS MUST CLEAR THE CARRIAGE DRIVE ASSEMBLY. (10) If the heads of the mounting screws protrude above the top surface of the mounting block (170), file the heads of the screws until they are below the plane of the mounting block. (11) Reassemble the carriage assembly to the mounting block with the shoulder screw (1170). (12) Align the link arm with the carriage and install the shoulder screw (1210). (13) Perform setup and check procedures in accordance with the Machine Setup and Testing chapter of this manual and adjust as necessary. REPAIR AND REPLACE 61-00-28 Page 3-10 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 M. Limit Switch LS-5 or LS-6 (315) (1) Remove the mounting hardware and the roller head cover (910). (2) Remove the limit switch mounting screws (510). (3) Disconnect the wires and discard the limit switch (315). (4) Install a new limit switch (315). (5) Perform setup and check procedures in accordance with the Machine Setup and Testing chapter of this manual and adjust as necessary. N. Fixture (340) NOTE: (1) For reference purposes, the fixture (340) consists of a base assembly, which bolts to the faceplate (360), and an arbor assembly, which fastens to the base assembly with screws and bolts. Remove the mounting screws (630). CAUTION: USE CARE NOT TO DAMAGE THE FACEPLATE WELDMENT. REMOVE THE FACEPLATE WELDMENT AND THE FIXTURE FROM THE MACHINE IF THE FIXTURE (340) IS DIFFICULT TO SEPARATE. (2) Remove the fixture (340) from the faceplate. (3) Fasten the new fixture to the faceplate and inspect the runout. NOTE 1: Runout must be 0.002 inch (0.05 mm). NOTE 2: Using the mounting screws, adjust to center the fixture. Do not use the four fine adjustment screws. (4) Using dowels, pin the fixture to the faceplate. (5) Assemble the fixture (340) on the machine. (6) Perform setup procedures in accordance with the Machine Setup and Testing chapter of this manual and adjust as necessary. REPAIR AND REPLACE 61-00-28 Page 3-11 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 O. Face Plate Weldment (360) (1) Loosen the set screw that holds the coupling (380). (2) Loosen the locking collars on the shaft of the faceplate (Figure 3-1). (3) Slide the faceplate weldment (360) out of the bearings. (4) Follow the fixture (340) replacement instructions as required. (5) Slide the faceplate weldment (360) through the pillow block bearings (660, 680), and into the bushing. Make sure to place the locking collars on the shaft at the appropriate time. (6) Adjust the coupling half as required. (7) Secure the locking collars when they are in position (Figure 3-1). (8) Perform setup and check procedures in accordance with the Machine Setup and Testing chapter of this manual and adjust as necessary. Locking Collars Face Plate Shaft Face Plate Weldment (360) MACH01A Coupling (380) Locking Collars on Shaft of Face Plate Figure 3-1 REPAIR AND REPLACE 61-00-28 Page 3-12 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 P. Right Angle Gear Motor (390) (1) Loosen the setscrew that holds the coupling (380). (2) Remove the motor mounting screws. (3) Remove the right angle gear motor (390). (4) Install a new motor. NOTE: (5) Shims may be required to achieve proper vertical alignment. Perform setup and check procedures in accordance with the Machine Setup and Testing chapter of this manual and adjust as necessary. Q. Roller Head Motor (500) (1) Remove the roller head cover (910). (2) Disconnect the wires to the motor. (3) Manually rotate the drive shaft to gain access to the set screws (1440). (4) Remove the set screws (1440). (5) Remove the motor mounting screws (590). (6) Slide the motor/mounting block from the roller column. (7) Remove the fasteners (510, 210). (8) Remove and discard the roller head motor (500). (9) Attach the new roller head motor (500) using fasteners (510, 210). (10) Attach the motor/mounting block on the roller column with motor mounting screws (590). (11) Insert the set screws (1440). (12) Connect the wires to the roller head motor (500). (13) Replace the roller head cover (910). REPAIR AND REPLACE 61-00-28 Page 3-13 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 R. Carriage Drive Motor (1280) CAUTION 1: THE POSITION OF THE LS-4 LIMIT SWITCH (300) IS EXTREMELY CRITICAL FOR SETUP. TO HELP REPOSITION THE SWITCH CLOSE TO THE ORIGINAL POSITION DURING THE CARRIAGE DRIVE MOTOR REPLACEMENT, SCRIBE AROUND THE BOTTOM OF THE CARRIAGE GEAR MOUNTING BLOCK (170) BEFORE REMOVING IT. CAUTION 2: THE RELATIONSHIP BETWEEN THE WORM GEAR AND THE CARRIAGE GEAR ASSEMBLY AFFECTS THE SETUP. USING A PERMANENT MARKER, MARK THE GEAR RELATIONSHIP FOR REASSEMBLY ORIENTATION. (1) Remove the link arm shoulder screw (1210). (2) Remove the shoulder screw (1170). (3) Remove the carriage gear assembly from the mounting block. (4) Remove the mounting screws (1590). CAUTION: BEFORE DISCONNECTING THE WIRES TO THE MOTOR, NOTE THE CONNECTIONS TO INSURE PROPER INSTALLATION OF THE NEW MOTOR. (5) Disconnect the motor wires. (6) Remove the drive shaft set screws (1440). (7) Remove the carriage drive motor mounting screws (210). (8) Replace the carriage drive motor (1280) with a new motor. (9) Replace the capacitor (650) with a new capacitor. (10) Attach the carriage drive motor (1280) with carriage drive motor mounting screws (210). (11) Insert the drive shaft set screws (1440). (12) Connect the motor wires in their original configuration. (13) Insert the mounting screws (1590). (14) Attach the carriage gear assembly on the mounting block. (15) Attach the shoulder screw (1170). (16) Attach the link arm shoulder screw (1210). REPAIR AND REPLACE 61-00-28 Page 3-14 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 S. Pillow Blocks (660, 680) (1) Loosen the locking collars on the faceplate shaft. (2) Loosen the set screw in the coupling (380). (3) Slide the faceplate weldment away from the pillow blocks (660, 680). (4) Remove the mounting fasteners that attach the pillow blocks. (5) Remove the pillow blocks (660, 680). (6) Place an alignment bushing on the shaft of the motor to help position the faceplate. NOTE: (7) To minimize the wear on the coupling insert (385), the centerline of the gear motor and the centerline of the faceplate should be within 0.005 inch (1.28 mm) from each other. The axis of the motor shaft is 2.250 inches (57.15 mm) from the surface of the motor mounting block. It may be necessary to use shims to obtain the precise vertical alignment of the motor (390) and the faceplate weldment (360). Attach the new pillow blocks (660, 680) using the appropriate spacers. NOTE: Fasteners should be snug, but should allow for movement. The bearing (660) should be moved as much as possible in the aft direction. (8) Place the faceplate spacer (1360) on the shaft of the faceplate weldment (360). (9) Slide the faceplate weldment through the pillow blocks (660, 680) and into the alignment bushing. (10) Clamp an indicator to the carriage to measure the parallelism between the faceplate and the carriage. (11) Disconnect the shoulder screw (1210) to permit the carriage to move freely. (12) Adjust the bearings, faceplate, and motor until the indicator shows a variation of less than 0.002 inch (0.05 mm) along the cylindrical surface of the fixture. (13) When alignment is achieved, tighten the bearing block screws. (14) Rotate the locking collars (supplied with the bearings) in the direction of the spindle rotation. (15) Tighten the set screws in both locking collars. (16) Tighten the set screw on the coupling half that is closest to the bearing. (17) Remove the right angle gear motor (390) from the motor mounting block (370). (18) Remove the alignment bushing. (19) Install a coupling bushing and reinstall the motor and motor coupling half. (20) Final torque the motor mounting bolts and tighten the coupling set screw. REPAIR AND REPLACE 61-00-28 Page 3-15 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (21) Perform setup and check procedures in accordance with the Machine Setup and Testing chapter of this manual and adjust as necessary. NOTE: If spindle alignment is not in previous position, new roller head spacers (1540, 1550, and 1560) must be made in accordance with print AST-2867-( ). Discard all obsolete spacers as required. T. Carriage Switch (830) (1) Remove the mounting screws. (2) Disconnect the wiring. (3) Remove and discard the carriage switch (830). (4) Install a new carriage switch (830). (5) Perform setup and check procedures in accordance with the Machine Setup and Testing chapter of this manual and adjust as necessary. U. O-ring (970) NOTE: Disconnect the air supply and run the machine until the roller head assembly has rotated enough to remove the piston and plunger from the rear of the pivot block. (1) Remove the dowel (600). (2) Set the roller arm assembly aside. (3) Cap the end of the hydraulic fitting to contain the fluid. (4) Disconnect the hydraulic line at the pivot block (1060). (5) Remove the dowel (990). CAUTION: NOTE THE ORIENTATION OF THE SPRING, PLUNGER, AND THE PISTON BEFORE REMOVING THE PLUNGER FROM THE PIVOT BLOCK. (6) Using a 3/16 inch (4.76 mm) diameter flat end punch, push the plunger out of the pivot block. (7) Remove and discard the O-rings (970) from both the piston and plunger. (8) Lubricate the new O-rings (970) with the appropriate hydraulic oil. (9) Install the new O-rings (970) in the piston and plunger. (10) Insert the spring and the plunger into the pivot block and move it forward. (11) Insert the piston into the pivot block and move it completely forward so the dowel (990) can be reinstalled. (12) Install the dowel (990). (13) Fill the piston cavity with the appropriate hydraulic oil. (14) Reconnect the hydraulic line to the pivot block. REPAIR AND REPLACE 61-00-28 Page 3-16 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (15) Return the roller head to the home position and follow the air bleed procedure in accordance with the Setup and Testing chapter of this manual. (16) Perform an applied load measurement in accordance with the Machine Setup and Testing chapter of this manual. V. Bearing (1130) (1) Remove the dowel (600). (2) Remove the roller arm assembly. (3) Remove the dowel (790). (4) Remove the shims (810) and the roller (1120). (5) Remove the existing bearing (1130). (6) Clean the bearing bore with solvent. (7) Spray the outside diameter of the bearing and the inside diameter of the roller with CM127 primer. (8) After five minutes, apply CM74 retaining compound to the roller ID and bearing OD. (9) Assemble the bearing in the roller and allow the CM74 retaining compound to cure in accordance with manufacturer's specifications. (10) Reassemble the roller into the roller arm. (11) Install the roller arm assembly into the machine. (12) Perform an applied load measurement in accordance with the Machine Setup and Testing chapter of this manual. REPAIR AND REPLACE 61-00-28 Page 3-17 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (Blank Page) REPAIR AND REPLACE 61-00-28 Page 3-18 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 MACHINE SETUP AND TESTING - CONTENTS 1. Test Setup After Machine Components Replacement.............................................. 4-3 A. Positioning of the Roller Head Subassembly...................................................... 4-3 B. Spacer BST-2872 Installation.............................................................................. 4-4 2. Machine Setup and Adjustments.............................................................................. 4-5 A. Main Power Switch (690).................................................................................... 4-5 B. Start Cycle Switch - LS-3 (700)........................................................................... 4-5 C. Carriage (Aft Stop) Switch - LS-2 (730).............................................................. 4-5 D. Carriage (Blade Drive Motor) Switch - LS-7 (835).............................................. 4-5 E. Limit Switch (Carriage Forward Stop Switch) - LS-4 (300)................................ 4-5 F. Limit Switch (Roller Head Forward Direction) - LS-5 (30) (under head cover).... 4-5 G. Carriage (Return) Switch - LS-1 (830)................................................................ 4-5 H. Limit Switch (Roller Motor Aft Direction) - LS-6 (315) (under the head cover).... 4-6 I. Set the Lubricator in the F.R.L. Unit ................................................................... 4-6 J. Set the Air and Oil Pressures.............................................................................. 4-6 K. Set the Air Switch................................................................................................ 4-6 L. Set the Bleed-off Time......................................................................................... 4-7 3. Machine Functional Test After Machine Components Replacement........................ 4-7 A. Applied Load Measurement................................................................................ 4-7 B. Rolling the Y-shank Test Specimen..................................................................... 4-9 4. Evaluation of Test Specimen.................................................................................. 4-11 5. Failure of Test Roll Specimen................................................................................. 4-12 6. Calibrating the Rolling Machine Baseline for a Y-shank Test Specimen................. 4-13 7. Initial Setup for a C-shank Rolling Conversion Kit TE594 (340A)........................... 4-16 A. Important Information........................................................................................ 4-16 B. Procedure.......................................................................................................... 4-16 MACHINE SETUP AND TESTING 61-00-28 Page 4-1 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 LIST OF FIGURES Spacer Between Roller Arm and Pivot Block........................................ Figure 4-1.............. 4-3 100885 label Installation........................................................................ Figure 4-2.............. 4-8 Y-shank Rolling Characteristics............................................................. Figure 4-3............ 4-10 Marking the Critical Area of the Y-shank Test Specimen....................... Figure 4-4............ 4-12 Air Control Arm Location....................................................................... Figure 4-5............ 4-14 Air Control Arm Components................................................................. Figure 4-6............ 4-14 Checking Runout of the C-shank Rolling Conversion Kit TE594........... Figure 4-7............ 4-17 Drilling Dowel Holes into the C-shank Rolling Conversion Kit TE594...... Figure 4-8............ 4-18 Installation of the Dowel Pins................................................................ Figure 4-9............ 4-18 Spacer AST-2867-3 Marking................................................................ Figure 4-10........... 4-20 C-shank Rolling Characteristics........................................................... Figure 4-11........... 4-22 Marking the Critical Area of the C-shank.............................................. Figure 4-12........... 4-23 MACHINE SETUP AND TESTING 61-00-28 Page 4-2 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 1. Test Setup After Machine Components Replacement NOTE 1: Special tools and equipment are necessary to perform setup of the DT-1724-3(F) rolling machine. For a list of requirements, refer to the section "Tools for Rolling Machine Setup" of the Special Tools, Fixtures, and Equipment chapter of this manual. NOTE 2: Contact Hartzell Propeller Inc. to obtain current copies of prints, as needed. A. Positioning of the Roller Head Subassembly NOTE: Each rolling machine contains a custom fit spacer AST-2867-( ). Custom fitting of the spacer is required, due to the multiple tolerances related with the positioning of the carriage and spindle. (1) Install the positioning spacer AST-2868 to the carriage. (2) Put a Y-shank cutoff specimen on the fixture. The Y-shank serves as a baseline for all other shank styles. (3) Loosen the screws that fasten the "L" gibs (780). (4) Install a 0.25 ±0.001 inch (6.35 ±0.025 mm) spacer between the roller arm and the pivot block. Refer to Figure 4-1. Pivot Block Roller Arm Spacer.Tif 0.25 ±0.001 Inch (6.35 ±0.025 mm) Spacer Spacer Between Roller Arm and Pivot Block Figure 4-1 MACHINE SETUP AND TESTING 61-00-28 Page 4-3 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 CAUTION: THE ROLLER ARM ASSEMBLY MUST BE PERPENDICULAR TO THE BLADE SURFACE. (5) Slide the roller arm assembly toward the Y-shank until the roller contacts the shank. (6) Tighten the fasteners on the "L" gibs (780). (7) Measure the distance between the support block (800) and the spacer AST-2868. (8) (a) Machine the spacer AST-2867 to the measured dimension, and stamp it in accordance with the print. (b) Machine the spacer AST-2867-1 to -0.063 inch (1.60 mm) less than the measured dimension, and stamp it in accordance with the print. (c) Machine Spacer AST-2867-2 to 0.125 inch (3.18 mm) greater than the measured dimension, and stamp it in accordance with the print. Following the instructions on drawing AST-2867-( ), stamp the part number and the serial number of the machine on the spacer. B. Spacer BST-2872 Installation (1) The BST-2872 is a subassembly that consists of the following parts. Assemble these parts according to print BST-2872: Part Description Quantity Spacer Block 2 Spacer Plate 1 #6-32 X 5/16 Socket Head Cap Screw 4 #6-32 X 1/2 Socket Head Cap Screw 1 (2) Place the spacer (1100) on the roller arm (1110) centered with the plunger. The contact surface of the spacer must be flat against the roller arm (1110). (3) Tighten the #6-32 x 1/2 screw to secure the assembly to the roller arm. (4) Spacer BST-2872 remains in its current position. It is used for both Y and D-shanks. MACHINE SETUP AND TESTING 61-00-28 Page 4-4 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 2. Machine Setup and Adjustments A. Main Power Switch (690) (1) No adjustment is necessary. B. Start Cycle Switch - LS-3 (700) (1) No adjustment is necessary. C. Carriage (Aft Stop) Switch - LS-2 (730) (1) No adjustment is necessary. D. Carriage (Blade Drive Motor) Switch - LS-7 (835) (1) The blade drive motor must remain running beyond zero pressure. (2) If adjustment is necessary, bend the arm of the carriage switch (835). E. Limit Switch (Carriage Forward Stop Switch) - LS-4 (300) CAUTION: (1) DISCONNECT THE AIR LINE BEFORE BEGINNING THE CYCLE. Disconnect the air line. CAUTION: WHEN THE CARRIAGE FORWARD STOP SWITCH STOPS THE FORWARD MOVEMENT OF THE CARRIAGE, TURN THE MAIN POWER SWITCH OFF, OR THE BLADE DRIVE MOTOR WILL ACTIVATE AND THE CYCLE WILL CONTINUE. (2) When the carriage forward stop switch stops the forward movement of the carriage, turn the main power switch off. A 0.250 inch (6.35 mm) spacer should fit snugly between the roller arm (1110) and the pivot block (1060) as the roller wheel makes contact with the blade shank radius. Refer to Figure 4-1. (3) If adjustment is necessary, move the 10-32 screw in the switch control bracket (1200) either in or out. F. Limit Switch (Roller Head Forward Direction) - LS-5 (30) (under head cover) (1) As the roller head forward direction limit switch (300) is activated, the pivot block (1060) should be parallel to the sides of the support frame (940). (2) If adjustment is necessary, bend the arm of the limit switch (300). G. Carriage (Return) Switch - LS-1 (830) (1) The carriage return switch (830) helps blend the tangency point of the shank radius. It is activated just as the roller head completes its arc. (2) If adjustment is necessary, bend the arm of the carriage switch (830). MACHINE SETUP AND TESTING 61-00-28 Page 4-5 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 H. Limit Switch (Roller Motor Aft Direction) - LS-6 (315) (under the head cover) (1) As the limit switch (roller motor aft direction) (315) is activated, the pivot block (1060) should be at an 11.5 degree angle to the front of the support frame (940). (2) Using a template, verify that the angle is correct. (3) If adjustment is necessary, bend the arm of the roller motor aft direction limit switch (315). I. Set the Lubricator in the F.R.L. Unit NOTE: The lubricator is located in the F.R.L. unit (1330). (1) The small setscrew on the top of the lubricator regulates the flow of oil. (2) If the lubricator is not using oil or is using too much oil, adjust as follows: (a) Disconnect the line to the flow control valve (20). (b) Actuate the air switch (130). (c) Set the oiler to dispense one drop every 20 seconds. (d) Release the water in the filter bowl. (e) Inspect the condition of both the filter and the lubrication bowls. If the bowls are cracked, damage, or show signs of deterioration, replace them in accordance with the Repair and Replace chapter of this manual. J. Set the Air and Oil Pressures (1) The air and oil pressures are regulated by the knob located on the top of the regulator in the F.R.L. unit (1330). (2) Turn the knob (clockwise to increase pressure, and counterclockwise to decrease pressure) to adjust the pressure to 1950-2000 psi on the gauge (420). K. Set the Air Switch (1) The air switch (130) is controlled by the air control arm (100) and accompanying #10-32 cap screw. (2) Set the air control (100) arm to allow air pressure to begin escaping from the air switch after the carriage has traveled 0.125 ±0.050 inch (3.18 ±1.27 mm) from the start position toward the aft position. CAUTION: (3) THE #10-32 CAP SCREW MUST CLEAR THE HOUSING OF THE AIR SWITCH (130). To adjust the air control arm (100) for more or less travel distance, loosen the cap screws that attach the control arm to the carriage (1010). NOTE: If necessary, the holes or slots in the air control arm (100) may be elongated to achieve the proper adjustment. MACHINE SETUP AND TESTING 61-00-28 Page 4-6 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 L. Set the Bleed-off Time (1) With the carriage in the aft position, set the pressure bleed-off time to 60-80 seconds. (a) Manually activate the air switch (130) to build up full pressure (1950-2000 psi) on the gauge (420). (b) Release the switch and use a stop watch to observe the amount of time it takes for the gauge (420) to return to zero pressure. (c) The bleed-off time is regulated by the air flow control valve. If the bleed-off time is not within the specified range (60-80 seconds), adjust by opening the valve for less time or closing the valve for more time. 3. Machine Functional Test After Machine Components Replacement Following the replacement of certain components in accordance with Table 3-2 of the Repair and Replace chapter and reassembly of the DT-1724-3(F) rolling machine, two tests must be made to make sure that the machine is working properly; (1) an applied load measurement that measures the force being applied by the roller to the shank, and (2) the rolling of a test blank for evaluation purposes. A. Applied Load Measurement (1) Install the load cell fixture on the fixture (340). NOTE: The load cell fixture is used as a support for the load cell to rest against. CAUTION: MAKE SURE THE FIXTURE (340) IS IN THE LOCKED POSITION AND THAT THE ROLLER HEAD IS PERPENDICULAR TO THE BLADE IN THE "HOME" POSITION. (2) Using a square, line up the surface of the load cell fixture closest to the roller (1120) to be perpendicular to the base (342). (3) Loosen the "L" Gibs (780) and slide the roller head assembly back to permit room for the load cell. (4) Using a 1/4 spacer between the roller arm (1110) and pivot block (1060), slide the roller head assembly forward until the roller (1120) contacts the load cell that is positioned between the roller and load cell fixture. (5) Tighten down the "L" Gibs (780). (6) Remove the 1/4 spacer and replace it with spacer BST-2872 (1100). (7) Manually start the air switch (130) to initialize the pressure. CAUTION: (8) THE ACCURACY OF THE LOAD CELL AND PRESSURE GAUGE ARE VERY CRITICAL. Adjust the air regulator knob on the F.R.L. unit (1330) until the gauge (420) reads 1950-2000 psi, permitting a dwell time for the pressure to reach a stable value. This is an approximate starting point. MACHINE SETUP AND TESTING 61-00-28 Page 4-7 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (9) While reading the indicated force on the load cell, adjust the knob on the F.R.L.unit (1330) until the load cell reads 250 lbs-force. (a) Make a record of the pressure indicated on the gauge (420) for use in step (11)(b) of this procedure. (b) If pressure is below 1775 psi on the gauge (420) when 250 lbs-force is reached, contact Hartzell Propeller Inc. Product Support. WARNING: ADHESIVES AND SOLVENTS ARE FLAMMABLE AND TOXIC TO THE SKIN, EYES, AND RESPIRATORY TRACT. SKIN AND EYE PROTECTION ARE REQUIRED. AVOID PROLONGED CONTACT AND BREATHING OF VAPORS. USE SOLVENT RESISTANT GLOVES TO MINIMIZE SKIN CONTACT AND WEAR SAFETY GLASSES FOR EYE PROTECTION. USE IN A WELL VENTILATED AREA AWAY FROM SPARKS AND FLAME. READ AND OBSERVE ALL WARNING LABELS. (10) Using a clean soft cloth dampened with MEK CM106 or other equivalent solvent, clean the surface of the gauge (420). Gauge (420) Indicated Gauge Pressure Label Spacer.Tif Serial Number 100885 Label Installation Figure 4-2 MACHINE SETUP AND TESTING 61-00-28 Page 4-8 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (11) Apply a 100885 label to the gauge (420). Refer to Figure 4-2. (a) Write the serial number of the DT-1724-3(F) rolling machine on the 100885 label. (b) Write the gauge (420) indicated air pressure on the 100885 label. (1) Refer to step (9) of this procedure for the indicated gauge pressure. (12) Keep a current Load Cell Calibration Certificate on file in the rolling machine records. (13) Repeat the procedure until the load force stabilizes. (a) New parts and possible air in the hydraulic circuit will cause readings to fluctuate. (14) Remove the load cell from the machine. (15) Remove the load cell fixture from the machine. (16) Remove the anti-rotation device from the fixture. B. Rolling the Y-shank Test Specimen NOTE: (1) Inspect the Y-shank test specimen for imperfections. (a) (2) Typically a Y-shank test specimen comes from a scrapped blade and has the shank end cut off. If the Y-shank test specimen has damage that is severe enough to cause possible damage to the machine, use a different sample. Install the spacer (1100) on the roller arm. (a) Position the spacer (1100) so the plunger (950) touches the middle of the spacer plate (860). (3) Put the Y-shank test specimen on the fixture (340). (4) Attach the Y-shank test specimen by rotating the expansion handle of the collet (310). (5) Put an indicator on the base (342), at the end of the carriage (1010), to monitor the relative position of the roller (1120) to the blade shank. (a) (6) The indicator must have a minimum travel limit of 1.25 inches (31.8 mm). Monitor the setting of the air control arm (100). This setting controls the distance that full pressure is applied after the roller (1120) passes the tangent point of the radius, after the carriage (1010) starts to move. (a) Monitor the distance that the carriage (1010) moves before the air pressure begins to be released by the air switch (130). (1) The carriage (1010) movement distance must be 0.125 ±0.050 inch (3.18 ±1.27 mm). (2) The carriage (1010) movement is controlled by adjusting the air control arm (100). Refer to section 2.K. in this chapter. MACHINE SETUP AND TESTING 61-00-28 Page 4-9 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (7) Monitor the pressure transition zone. CAUTION: (a) (8) Measure the distance that the carriage (1010) travels from when the pressure starts to release until the pressure is zero. (1) The distance must be a minimum of 0.220 inch (5.59 mm). (2) The carriage (1010) movement is controlled by adjusting the bleed-off time. Refer to section 2.L. in this chapter. Attach the air supply to the F.R.L. unit (1330). (a) (9) MAKE SURE THE PRESSURE HAS BLED TO ZERO BEFORE THE BLADE HAS STOPPED TURNING. The incoming supply must be 100-120 psi. When the adjustments are complete, run a preliminary trial with no air supply. (10) Turn on the main power switch (690). (11) Actuate the start cycle switch (700). 0.570 inch (14.48 mm) Maximum Critical Area rolled at full pressure 0.540 ±0.075 0.220 Inch inch (13.72 ±1.91 (5.59 mm) mm) Min. Pressure Transition Zone Pressure must flare out to zero compression within this zone * Tangent Point of Radius * Pressure must bleed to zero PSI before the blade stops rotating. APS0508D 0.415 inch (10.54 mm) Radius Y Shank Rolling Characteristics Figure 4-3 MACHINE SETUP AND TESTING 61-00-28 Page 4-10 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 4. Evaluation of Test Specimen A. Required Component Checks After Replacement (1) Following the replacement of any of the components listed in Table 3-2 of the Repair and Replace chapter in this manual, perform the following checks: (a) Before beginning the rolling process, examine the contour of the retention radius on the optical comparator, using a mylar overlay. Refer to Appendix A - Optical Comparator chapter in the Hartzell Propeller Inc. Aluminum Blade Overhaul Manual 133C (61-13-33). NOTE: The radius of the sample must conform to the optical comparator overlay. If the radius does not conform to the optical comparator overlay, use a different sample. (b) After the rolling process is completed, using a profilometer TE436 measure the surface finish of the rolled radius and transition area of the blade shank in accordance with the Overhaul Procedures section in the Blade Shank Overhaul chapter of Hartzell Propeller Inc. Aluminum Blade Overhaul Manual 133C (61-13-33). (c) After the rolling process is completed, reinspect the blade shank on the optical comparator to make sure the rolling process did not change the shape or contour of the radius. (d) If the shape or contour of the radius was changed by the rolling process, refer to the section, "Failure of Test Roll Specimen" in this chapter. (e) The surface of the radius and shank must meet the dimensional requirements and must meet or exceed the surface finish requirements as shown in Figure 4-3. (f) Examples of unacceptable surface conditions are indents, pits, ridges, or abrupt transitions. Unacceptable conditions must be polished out in accordance with the limits as shown in Figure 4-3, and the blade retention radius must be re-rolled. MACHINE SETUP AND TESTING 61-00-28 Page 4-11 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 5. Failure of Test Roll Specimen A. Procedure (1) If the test roll specimen does not meet the requirements in the Evaluation of Test Specimen section of this chapter, replacement of the following components is allowed: Item Number Part Number Description 680 PB221-1 7/16 Bore Pillow Block 660 PB900X-1 7/16 Bore Pillow Block 360DT-1724+36Limit Switch 1120DT-1724+112Roller Wheel 1130DT-1724+113Bearing (2) Replace the above components as necessary, in accordance with the Repair and Replace chapter of this manual. (3) After the replacement of any of the components listed in Table 3-2 of the Repair and Replace chapter of this manual, roll a new specimen and evaluate it in accordance with the Evaluation of Test Specimen section in this chapter. Horizontal Mark Minimum Tolerance 0.540 - 0.075 inch (13.72 - 1.90 mm) TPI-128-043 Maximum Tolerance 0.540 + 0.075 inch (13.72 + 1.90 mm) Marking the Critical Area of the Y-shank Test Specimen Figure 4-4 MACHINE SETUP AND TESTING 61-00-28 Page 4-12 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 6. Calibrating the Rolling Machine Baseline for a Y-shank Test Specimen NOTE: This step is to confirm the location of the compressive rolling to bleed-off location and to make sure that both the Y-shank and C-shank transition areas begin within acceptable locations when converted. A. Measuring the critical area (1) The machine can be cycled with no blade or specimen installed. (2) The location of the carriage should be at the point that the roller (1120) completed the compressive rolling and the bleed down begins. (3) The roller head must be moved back so that the roller (1120) does not interfere with the collet (310). (4) (a) Loosen the "L" gib (780) screws. (b) Remove the installed AST-2867 spacer (1560). (c) Slide the support block (800) and assembly back against the AST-2868 spacer (1090). Set the carriage position. (a) Cycle the machine. CAUTION: (b) Shut off the power as soon as the air control arm releases the air valve ball and the air pressure can be heard releasing. NOTE: (c) STOP THE CARRIAGE TRAVEL AS SOON AS POSSIBLE ONCE BLEED DOWN BEGINS. The hydraulic pressure can also be seen lowering on the hydraulic pressure gauge. When the carriage position is set: 1 Reinstall the AST-2867 spacer (1560). 2 Tighten the "L" gib (780) screws to snug. (5) Install a Y-shank test specimen on the rolling machine. (6) Verify the tolerance of the critical area of a Y-shank blade. (a) With the Y-shank specimen installed on the rolling machine, mark the minimum and maximum tolerances of the shank critical area using a felt tip marker. Refer to Figure 4-3 and Figure 4-4. 1 Using a felt tip pen, indicate the minimum and maximum tolerances of the shank critical area. a Make a mark at 0.540 - 0.075 inch (13.72 - 1.90 mm) to indicate the minimum tolerance. b Make a mark at 0.540 + 0.075 inch (13.72 + 1.90 mm) to indicate the maximum tolerance. MACHINE SETUP AND TESTING 61-00-28 Page 4-13 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 Screws TPI-128-044 Air Control Arm Air Control Arm Location Figure 4-5 TPI-128-045 Slotted holes to adjust positioning of the air control arm Air Control Arm Components Figure 4-6 MACHINE SETUP AND TESTING 61-00-28 Page 4-14 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (b) Using a felt tip pen, make a horizontal mark across the minimum and maximum tolerance markings made on the shank critical area. Refer to Figure 4-4. (c) Rotate the test specimen with the spindle, so that the roller (1120) is in line with the shank at the location of the horizontal mark. (d) While holding the roller (1120) so that it does not move, rotate the shank back and forth by hand so that the roller (1120) makes a mark through the ink where it contacts the test Y-shank specimen. (e) Measure the location of the mark made by the roller (1120). CAUTION: DOCUMENT THE LOCATION OF THE AIR CONTROL ARM (100) BEFORE AND AFTER ADJUSTMENT IF ADJUSTMENT IS NECESSARY. (f) To make sure of the location of the air control arm (100), document the location before and after adjustment. (g) If the mark made by the roller is not at the center of the minimum and maximum tolerances of the shank critical area, adjust the air control arm (100) on the rolling machine to bring it into the center of tolerance. Refer to Figure 4-3, Figure 4-5, and Figure 4-6. 1 Adjusting the air control arm (100) a Loosen the screws. Refer to Figure 4-5. b Move the air control arm (100) to the left or right to center the roller (1120) in the shank critical area. Refer to Figure 4-6. c Tighten the screws. Refer to Figure 4-5. d Repeat steps (6)(a) through (6)(d) of this procedure until the mark made by the roller is at the center of the minimum and maximum tolerances of the shank critical area. MACHINE SETUP AND TESTING 61-00-28 Page 4-15 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 7. Initial Setup for a C-shank Rolling Conversion Kit TE594 (340A) WARNING: BEFORE STARTING THIS PROCEDURE, UNPLUG THE BLADE SHANK ROLLING MACHINE COMPLETELY. A. Important Information (1) This setup procedure must only be completed once at the initial conversion of the rolling machine to accommodate the Raptor C-shank blade. If these steps have been completed, refer to the Hartzell Propeller Inc. Aluminum Blade Overhaul Manual 133C (61-13-33), Appendix D - Rolling Machine. (2) For the baseline calibration of a Y-shank test specimen, refer to the section, "Calibrating the Rolling Machine Baseline for a Y-shank Test Specimen" in this chapter. B. Procedure (1) Remove the existing fixture (340) from the faceplate (360). (2) Clean and deburr the faceplate (360) as necessary. (3) Assemble the C-shank rolling conversion kit TE594 (340A). (a) Press the pin locator (346) into the base (342) with an arbor press. (b) Secure the ring clamp (344) onto the base (342) with four locally procured screws 5/16-18 x 3/4 inch. 1 (c) Torque the screws to 8-12 Ft-Lb (11-16 N•m). Hold the ring clamp (344) together using four locally procured screws 1/4-28 x 1 inch and a 1/4 inch washer at the head of each screw. NOTE: (4) The washer can be used as a clamping aid to make sure all bolts are loose when removing a blade, by freely spinning the washer when screws are loose. Using three locally procured 1/2-13 bolts, install the C-shank rolling conversion kit TE594 (340A) onto the faceplate (360). MACHINE SETUP AND TESTING 61-00-28 Page 4-16 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 Use a dial indicator to check the runout of the C-shank rolling conversion kit TE594 (340A). Refer to Figure 4-7. (a) Rotate by hand to check the runout of the C-shank rolling conversion kit TE594 (340A). 1 A maximum of 0.005 inch (0.12 mm) runout is permitted. 2 If the runout is greater than 0.005 inch (0.127 mm), tap with a mallet until the runout is in tolerance. TPI-128-046 (5) Checking Runout of the C-shank Rolling Conversion Kit TE594 Figure 4-7 MACHINE SETUP AND TESTING 61-00-28 Page 4-17 Rev. 3 Jun/23 TPI-128-047 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 Drilling Dowel Holes into the C-shank Rolling Conversion Kit TE594 Figure 4-8 C-shank Rolling Conversion Kit (340A) Dowel Holes TPI-128-050 Collet Fixture (340) Dowel Holes Installation of the Dowel Pins Figure 4-9 MACHINE SETUP AND TESTING 61-00-28 Page 4-18 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (6) (8) From the back side of the faceplate (360), locate and drill dowel holes approximately 180 degrees apart. Refer to Figure 4-8. (a) Holes may be drilled at any location on the faceplate if no hole is already present in that location. (b) For dowel pin installation, drill holes through the faceplate and into the C-shank rolling conversion kit TE594 (340A). Refer to Figure 4-9. (c) Remove the C-shank rolling conversion kit TE594 (340A) from the faceplate (360). (d) Deburr and clean the faceplate (360) after drilling. (e) Match mark the dowel holes to the base (342). Refer to Figure 4-9. Install locally procured 1/4 x 1/2 inch dowel pins. (a) (9) For ease of changeover 1 The fit between the dowel pin and the C-shank rolling conversion kit TE594 (340A) is a slip fit. 2 The fit between the dowel pin and the faceplate (360) is a press fit. Bolt the C-shank rolling conversion kit TE594 (340A) by aligning the installed dowel pins (350) and installing the 1/2-13 bolts onto the faceplate (360). (10) Tighten the bolts to 35-45 Ft-Lb (48-61 N•m). (11) Rotate by hand to check the runout of the C-shank rolling conversion kit TE594 (340A). (a) A maximum of 0.005 inch (0.12 mm) runout is permitted. Refer to Figure 4-7. (b) If the runout is greater than 0.005 inch (0.12 mm), tap with a mallet until the runout is in tolerance. (12) Cutting the 104811 spacer (341) to size to make the AST-2867-3 spacer. (a) Put a C-shank cutoff specimen on the fixture. (b) Tighten the clamping bolts to a minimum of 35-70 In-Lbs (48-94 N•m). (c) Loosen the screws that fasten the "L" gibs (780). (d) Put a 0.25 ±0.010 inch (6.35 ±0.25 mm) spacer between the roller arm (1110) and the pivot block (1060). Refer to Figure 4-1. MACHINE SETUP AND TESTING 61-00-28 Page 4-19 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 CAUTION: THE ROLLER ARM ASSEMBLY MUST BE PERPENDICULAR TO THE BLADE SURFACE. (e) Move the roller arm assembly toward the C-shank until the roller (1120) contacts the shank. (f) Tighten the fasteners on the "L" gibs (780) to snug. (g) Measure the distance between the support block (800) and the spacer AST-2868 (1090). 1 Machine the spacer AST-2867-3 to the measured dimension. 2 Dot peen or vibro tool stamp the part number, revision, serial number, "C", and arrows on the spacer AST-2867-3. Refer to Figure 4-10. (13) If the power was not restored from the C-shank rolling conversion kit TE594 baseline procedure, then the Y-shank carriage location has not moved. Go to step (14)(f) of this procedure. AST-2867-3 Rev.______ S/N ______ C Spacer AST-2867-3 Marking Figure 4-10 MACHINE SETUP AND TESTING 61-00-28 Page 4-20 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (14) If the carriage has moved after the C-shank rolling conversion kit TE594 baseline setup, relocate the carriage. (a) The machine can be cycled with no blade or specimen installed. (b) The location of the carriage should be at the point that the roller (1120) completed the compressive rolling and the bleed down begins. (c) The roller head must be moved back so that the roller (1120) does not interfere with the C-shank rolling conversion kit TE594. (d) 1 Loosen the "L" gib (780) screws. 2 Remove the installed AST-2867-3 spacer. 3 Slide the support block (800) and assembly back against the AST-2868 spacer (1090). Set the carriage position. 1 Cycle the machine. CAUTION: 2 Shut off the power as soon as the air control arm releases the air valve ball and the air pressure can be heard releasing. NOTE: (e) (f) STOP THE CARRIAGE TRAVEL AS SOON AS POSSIBLE ONCE BLEED DOWN BEGINS. The hydraulic pressure can also be seen lowering on the hydraulic pressure gauge. When the carriage position is set, 1 Reinstall the AST-2867(-) spacer. 2 Tighten the "L" gib (780) screws to snug. Install a C-shank test specimen on the C-shank rolling conversion kit TE594. MACHINE SETUP AND TESTING 61-00-28 Page 4-21 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 0.570 inch (14.48 mm) Maximum Critical area rolled at full pressure 0.562 ±0.075 inch (14.27 ±1.91 mm) Pressure Transition Zone 0.220 Inch (5.59 mm) Min. Pressure must flare out to zero compression within this zone * 0.432 inch (10.97 mm) Radius TPI-128-048 * Pressure must bleed to zero PSI before the blade stops rotating. C-shank Rolling Characteristics Figure 4-11 MACHINE SETUP AND TESTING 61-00-28 Page 4-22 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 Horizontal Mark Maximum Tolerance TPI-128-049 Minimum Tolerance Marking the Critical Area of the C-shank Figure 4-12 MACHINE SETUP AND TESTING 61-00-28 Page 4-23 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (15) Verify the tolerance of the critical area of a C-shank blade (a) Using a felt tip pen, make a mark to indicate the minimum and maximum tolerances of the shank critical area. Refer to Figure 4-11 and Figure 4-12. (b) Using a felt tip pen, make a horizontal mark across the minimum and maximum tolerance markings made on the shank critical area. Refer to Figure 4-12. (c) Rotate the test specimen with the spindle, so that the roller (1120) is in line with the shank at the location of the horizontal mark. (d) While holding the roller (1120) so it does not move, rotate the shank back and forth so that the roller (1120) makes a mark through the ink where it contacts the shank of the C-shank blade. (e) Measure the location of the mark made by the roller (1120). 1 (f) If the ink mark is not within the minimum and maximum tolerances of the shank critical area, call the Hartzell Propeller Inc. Product Support Department. If the rolling machine is within the minimum and maximum tolerances of the shank critical areas, the rolling machine is ready to roll C-shank blades. MACHINE SETUP AND TESTING 61-00-28 Page 4-24 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 SPECIAL TOOLS, FIXTURES, AND EQUIPMENT - CONTENTS 1. Minimum Facility and Tooling Requirements............................................................5-3 A. Tooling.................................................................................................................5-3 B. Facilities..............................................................................................................5-3 2. Special Tools.............................................................................................................5-3 A. Special Tools.......................................................................................................5-3 B. Listings................................................................................................................5-3 3. Tools for Rolling Machine Setup...............................................................................5-4 LIST OF ILLUSTRATIONS Load Cell Fixture........................................................................... Figure 5-1..................... 5-4 SPECIAL TOOLS, FIXTURES, AND EQUIPMENT 61-00-28 Page 5-1 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (Blank Page) SPECIAL TOOLS, FIXTURES, AND EQUIPMENT 61-00-28 Page 5-2 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 1. Minimum Facility and Tooling Requirements A. Tooling (1) Propeller repair stations approved to overhaul Hartzell propellers are expected to have precision fixtures, tools, and gauges necessary for inspection and parts replacement of the DT-1724-3(F) rolling machine. Except as specifically required in this manual, locally fabricated tooling is acceptable for most repair and inspection operations. B. Facilities (1) Grinding and painting of rolling machine components have the potential for health and safety hazards beyond that of other areas of a typical workshop. It is expected that such areas be in compliance with industry standards and governmental regulations concerning occupational safety and health, as well as environmental protection. (2) Workshop areas need to be segregated to prevent contamination. Separate areas should be designated for cleaning, inspection, painting and assembly. 2. Special Tools A. Special Tools (1) Hartzell Tool and Equipment Manual 165A (61-00-65) contains a listing of special tools available from Hartzell. The manual also includes vendor lists for other specialty tooling not sold by Hartzell. B. Listings (1) The Introduction section of Manual 165A (61-00-65) provides information about what is included in the listings and how to quickly locate tools. SPECIAL TOOLS, FIXTURES, AND EQUIPMENT 61-00-28 Page 5-3 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 3. Tools for Rolling Machine Setup A. List of Tools The following is a list of special tools and equipment that are necessary to perform the setup of the DT-1724-3(F) rolling machine. (a) 0.25 inch (6.35 mm) spacer for roller arm (b) Y-shank cutoff to act as a gauge. 1 The diameter must be within specification. Refer to Hartzell Propeller Inc. Aluminum Blade Overhaul Manual 133C (61-13-33). (c) Certified load cell with a 0-500 or 0-1000 lb. range (d) Load cell fixture - Y-shank with a milled flat (refer to Figure 5-1) (e) Linear indicator (f) Stop watch (g) Practice roll/setup specimen NOTE: (h) The practice setup specimen may be taken from a scrap blade. The shank of the specimen must be within specification. Official roll specimen for certification 0 25 500 100 Y-shank with a milled flat Fixture 2.824 inches (71.73 mm) Load cell thickness plus fixture W10523 W10524 (1) Load Cell Fixture Figure 5-1 SPECIAL TOOLS, FIXTURES, AND EQUIPMENT 61-00-28 Page 5-4 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 ILLUSTRATED PARTS LIST - CONTENTS 1. Introduction............................................................................................................... 6-3 A. General............................................................................................................... 6-3 B. Using the Illustrated Parts List............................................................................ 6-3 2. Description of Columns............................................................................................ 6-3 A. Fig/Item Number.................................................................................................. 6-3 B. Part Number........................................................................................................ 6-4 C. Part Replacement Code...................................................................................... 6-4 D. Description.......................................................................................................... 6-5 E. Effectivity Code (EFF CODE).............................................................................. 6-5 F. Procurement Source........................................................................................... 6-6 G. Units Per Assembly (UPA)................................................................................... 6-6 3. Description of Terms................................................................................................. 6-6 A. Alternate.............................................................................................................. 6-6 B. Supersedure........................................................................................................ 6-6 C. Replacement....................................................................................................... 6-6 D. Obsolete.............................................................................................................. 6-7 4. Vendor Supplied Hardware....................................................................................... 6-7 A. Important Information.......................................................................................... 6-7 LIST OF FIGURES DT-1724-3(F) Rolling Machine, Side View.......................................Figure 6-1................... 6-8 DT-1724-3(F) Rolling Machine, Top View.........................................Figure 6-2................... 6-9 DT-1724-3F Rolling Machine............................................................Figure 6-3................. 6-10 DT-1724-3(F) Rolling Machine Section Views..................................Figure 6-4................. 6-11 LIST OF COMPONENTS DT-1724-3(F) Rolling Machine.......................................................................................... 6-12 ILLUSTRATED PARTS LIST 61-00-28 Page 6-1 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 (Blank Page) ILLUSTRATED PARTS LIST 61-00-28 Page 6-2 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 1. Introduction A. General (1) The Illustrated Parts List contains the current configurations for the DT-1724-3(F) rolling machines manufactured by Hartzell Propeller Inc. included in this manual and supersedes any prints that may have previously been supplied for part and assembly information. The parts list contained within the Illustrated Parts List is to be used to make sure of the configuration of the DT-1724-3(F) rolling machines and for ordering parts. CAUTION: (2) ILLUSTRATIONS IN THE ILLUSTRATED PARTS LIST ARE TO BE USED FOR IDENTIFYING PARTS AND SHOULD NOT BE USED AS A MAINTENANCE REFERENCE FOR ASSEMBLY. Figures are for reference only. The figures provide general views of parts. For ease of illustration, typical views of some parts were created and shown in multiple figures. For this reason, illustrated parts may not exactly reflect parts contained in some DT-1724-3(F) rolling machines. B. Using the Illustrated Parts List (1) If a repair station has questions about the DT-1724-3(F) rolling machines as stated in the Illustrated Parts List, contact the Hartzell Propeller Inc. Product Support Department. 2. Description of Columns (Rev. 1) A. Fig/Item Number (1) Figure Number refers to the illustration where items appear. Item Numbers refer to the specific part callout in the applicable illustration. (a) Item Numbers that are listed but not shown in the illustration are identified by a dash to the left of the item number. (example: "-800") (b) Alpha variants will be used to add additional items. There are two reasons for the use of alpha variants: 1 A part may have an alternate, or may be superseded, replaced, or obsoleted by another part. a 2 For example, the self-locking nut (A-2043) that is item 20 was superseded by the self-locking nut (A-2043-1) that is item 20A. An Illustrated Parts List may contain multiple configurations. Effectivity codes are used to distinguish different part numbers within the same list. a For example, one propeller configuration may use a mounting bolt (B-3339-1) that is item 30, yet another propeller configuration uses a mounting bolt (B-3347) that is item 30A. Effectivity codes are very important in the determination of parts in a given configuration. ILLUSTRATED PARTS LIST 61-00-28 Page 6-3 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 B. Part Number (1) The Part Number is the Hartzell Propeller Inc. identification number for the part. (2) Use the Hartzell Propeller Inc. part number when ordering the part from Hartzell or a Hartzell-approved distributor. C. Part Replacement Code (1) The part replacement codes indicate the following: (a) (b) NCR - No Check Required. 1 The components that have this code may be directly replaced when required. 2 A component that has this code does not effect the setup of the machine and, therefore, does not require setup tests, checks, and/or calibration procedures to be performed after it is replaced. SCR - Setup and Check Required. 1 A component that has this code may be replaced in the field; however, it may affect the original setup of the machine. a (c) If one of these components is replaced, the appropriate setup tests and/or check procedures must be performed in accordance with the Machine Setup and Testing chapter of this manual before additional blade shanks are rolled. HPI - Hartzell Propeller Inc. only. 1 A component that has this code may be replaced only by Hartzell Propeller Inc. a If replacement of one of these components is necessary, the entire rolling machine must be returned to Hartzell Propeller Inc. for repair. ILLUSTRATED PARTS LIST 61-00-28 Page 6-4 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 D. Description (1) This column provides the Hartzell Propeller Inc. description of the part. (2) Bullets and indentations are used to indicate parts that are components of a sub-assembly. (a) For example, a Fork Assembly that is part of a HC-C2YR-1 propeller assembly will have one bullet ( • ) before the description. This indicates that the Fork Assembly is part of the propeller assembly. 1 A Fork Bumper that is part of the Fork Assembly will appear directly below the Fork Assembly with two bullets ( • • ) before the description. This indicates that the Fork Bumper is part of the Fork Assembly - that is part of the Propeller Assembly. a Example: HC-C2YR-1 • Fork Assembly • • Fork Bumper (3) If the description in this column includes a "PCP:" prefix, the part is classified as a Propeller Critical Part. (4) If applicable, information regarding part alternatives, supersedures, replacements, or obsolescence will appear in the Description column. (5) (a) Refer to the section, "Description of Terms" in this chapter for definitions and requirements for part "alternates", "supersedures", etc. (b) When part alternatives, supersedures, replacements, etc. are listed, the service document number related to the change may be included for reference. If applicable, vendor CAGE codes will be listed in the Description column. E. Effectivity Code (EFF CODE) (1) (2) This column is used when additional information about a part is required. (a) Effectivity codes can be used to identify parts that are only used on a particular model, or to direct the user to additional information in the "Effectivity" box at the bottom of the page. (b) Whenever an effectivity code is present, refer to the "Effectivity" box at the bottom of the page for the applicable information. Parts common to all assembly models on the page show no effectivity code. ILLUSTRATED PARTS LIST 61-00-28 Page 6-5 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 F. Procurement Source (1) This column identifies the approved source for procurement of the part. (a) HPI - Hartzell Propeller Inc. A component that has this code can be purchased from Hartzell Propeller Inc. only. (b) M - Manufactured component - A component that has this code is not available for purchase, but must be locally manufactured. Contact Hartzell Propeller Inc. for the current print. (c) NA - Not Applicable - A component that has this code is not approved by Hartzell Propeller Inc. for replacement in the field. (d) OBS - Obsolete - A component that has this code is obsolete and no longer used in the DT-1724-3F rolling machine assemblies. (e) V - Vendor - A component that has this code may be purchased from a vendor other than Hartzell Propeller Inc. Some of these components can also be available for purchase from Hartzell Propeller Inc. G. Units Per Assembly (UPA) (1) Designates the total quantity of an item required for the next higher assembly or subassembly. 3. Description of Terms (Rev. 1) A. Alternate (1) Alternate parts are identified by the term "ALTERNATE" in the Description column. Alternate items are considered airworthy for continued flight and existing stock of parts may be used for maintenance and/or repair. The new or alternate part number may be used interchangeably when ordering/stocking new parts. B. Supersedure (1) Part changes are identified by the terms “SUPERSEDES ITEM _____” or “SUPERSEDED BY ITEM _____” in the Description column. Superseded items are considered airworthy for continued flight and existing stock of superseded parts may be used for maintenance and/or repair. Once the superseding part has been incorporated/installed into an assembly, the original superseded part may no longer be used. Superseded parts may no longer be available, and the new part number must be used when ordering/stocking new parts. C. Replacement (1) Part changes identified by the terms "REPLACES ITEM _____” or “REPLACED BY ITEM _____” in the Description column are considered airworthy for continued flight, but must be replaced with a part with the new part number at overhaul. Existing stock of replaced parts may not be used for maintenance and/or repair of effected assemblies. Replaced parts may no longer be available, and the new part number must be used when ordering/stocking new parts. ILLUSTRATED PARTS LIST 61-00-28 Page 6-6 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 D. Obsolete (1) Obsolete parts are identified by "OBS” in the Units Per Assembly (UPA) column. Obsolete items are considered unairworthy for continued flight. 4. Vendor Supplied Hardware (Rev. 1) A. Important Information (1) Many O-rings, fasteners, and other vendor supplied hardware listed in Hartzell Propeller Inc. manuals have previously been specified with AN, MS, NAS, or vendor part number. To provide internal controls and procurement flexibility, Hartzell part numbers have been assigned to all O-rings, fasteners, and hardware. Part shipments from Hartzell Propeller Inc. will specify only the Hartzell part numbers. (2) Some O-rings, fasteners, and hardware manufactured in accordance with established industry specifications (certain AN, MS, NAS items) are acceptable for use in Hartzell Propeller Inc. products without additional standards imposed by Hartzell. (a) For a listing of part number interchangeability, refer to the Vendor Cross Reference chapter of Hartzell Propeller Inc. Standard Practices Manual 202A (61-01-02). (b) Where permitted, both the Hartzell part number item and AN, MS, NAS, and other specified vendor number items can be used interchangeably. (c) The Hartzell part number must be used when ordering these parts from Hartzell Propeller Inc. ILLUSTRATED PARTS LIST 61-00-28 Page 6-7 Rev. 3 Jun/23 ILLUSTRATED PARTS LIST TPI-JM-000007 1240 1250 410 1420 420 1330 260 1660 430 430 1650 250 1370 61-00-28 1710 400 1480 1470 710 230 680 700 1690 1700 1360 690 MAIN POWER SWITCH 1150 360 DT-1724-3(F) Rolling Machine, Side View Figure 6-1 240 390 110 100 540 1000 610 830 820 780 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 Page 6-8 Rev. 3 Jun/23 ILLUSTRATED PARTS LIST TPI-JM-000008 30 20 370 900 60 890 1580 380 160 870 1170 140 630 640 590 860 1690 120 660 1700 130 DT-1724-3(F) Rolling Machine, Top View Figure 6-2 385 150 1210 1090 1540 1550 1560 910 10 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 61-00-28 Page 6-9 Rev. 3 Jun/23 TPI-JM-000007 DT-1724-3F Rolling Machine Figure 6-3 770 1670 1680 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 ILLUSTRATED PARTS LIST 61-00-28 Page 6-10 Rev. 3 Jun/23 ILLUSTRATED PARTS LIST 850 1120 61-00-28 1040 750 760 1010 800 VIEW A 730 LS(2) 810 1130 790 330 1590 DT-1724-3(F) Rolling Machine Section Views Figure 6-4 LS(7) REF. 620 840 350 990 1050 310 980 340 1100 950 80 170 1110 960 600 SECTION B-B 520 970 740 500 M3 920 180 190 D B VIEW D LS(5) 930 1440 50 1070 290 550 720 300 1350 810 305 70 940 1380 1060 LS(6) 510 B 200 1260 1220 LS(4) 1280 M2 570 480 210 650 220 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 Page 6-11 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 FIG./ITEM NUMBER PART NUMBER REPLACEMENT CODE 6-1, 6-2, 6-4 10 DT-1724+1 20 DT-1724+2 SCR 30 DT-1724+3 NCR -40 STANDARD* 50 DT-1724+5 HPI 60 STANDARD* 70 DT-1724+7 HPI 80 DT-1724+8 HPI -90 DT-1724+9 100 DT-1724+10 SCR 110 STANDARD* 120 STANDARD* 130 DT-1724+13 SCR 140 DT-1724+14 NCR 150 DT-1724+15 SCR 160 DT-1724+16 NCR 160A DT-1724+16 170 180 190 200 210 220 230 240 DT-1724+17 DT-1724+18 DT-1724+19 DT-1724+20 STANDARD* DT-1724+22 DT-1724+23 DT-1724+24 NCR NCR 250 260 260A DT-1724+25 44605K192 DT-1724+26 NCR NCR NCR -270 -280 290 300 DT-1724+27 DT-1724+28 NA DT-1724+29 DT-1724+30 SCR 305 310 330 DT-1724+30A DT-1724+31 DT-1724+33 EFFECTIVITY NCR HPI HPI HPI SCR NCR NCR MODEL DESCRIPTION EFF PROCUREMENT UPA CODE SOURCE BASE PLATE NA FLOW CONTROL VALVE (DETROL F20B) V FITTING (SWAGLOK B-500-1-4) V 5/16-18 X 3/4 SOCKET HEAD CAP SCREW V BUSHING NA 1/4-20 X 1/2 SOCKET HEAD CAP SCREW V WORM GEAR ASSEMBLY, ROLLER HEAD NA WORM GEAR ASSEMBLY CARRIAGE NA ADVANCE NUT, VALVE MOUNTING OBS AIR CONTROL ARM M #10-32 HEX NUT V #10-32 X 3/4 SOCKET HEAD CAP SCREW V AIR SWITCH (NORGREN 03-0293-22) V FITTING (SWAGLOK S-500-2-2) V LINK ARM HPI TUBING, AIR (IMPERIAL EASTON V 55-P-5/16 POLY-FL) TUBING, AIR (MCMASTER-CARR 5180K72), V ALTERNATE FOR ITEM 160 MOUNTING BLOCK, CARRIAGE GEAR NA WORM GEAR NA WORM GEAR BRACKET NA DRIVE SHAFT NA #8-32 X 3/4 SOCKET HEAD CAP SCREW V CARRIAGE MOTOR MOUNTING PLATE NA AIR VALVE V STEEL PIPE NIPPLE 1/4" X 6" LONG V (MCMASTER CARR 44615K482) PIPE SUPPORT BRACKET M UNION 1/4" BLACK (MCMASTER-CARR) V UNION 1/4" BLACK (CAJON SS-4-UBJ), V ALTERNATE FOR ITEM 260 ROLLER DRIVE GEAR GEAR PLATE NA PLATE, MOUNTING, SWITCH NA LIMIT SWITCH V (MICRO SWITCH BZ-2RW8225551-A2) SWITCH COVER (MICRO SWITCH 3PA1) V COLLET (ITW AC-602) V SPACER, BLADE SHANK HPI EFFECTIVITY 1 1 1 6 2 9 1 1 1 1 2 2 1 2 1 3 3 1 2 1 1 12 1 1 1 1 1 1 1 1 1 3 6 1 1 MODEL - ITEM NOT ILLUSTRATED * STANDARD - GRADE 5 OR BETTER DT-1724-3(F) Rolling Machine ILLUSTRATED PARTS LIST 61-00-28 Page 6-12 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 FIG./ITEM NUMBER PART NUMBER 6-1, 6-2, 6-4 340 DT-1724+34 REPLACEMENT CODE DESCRIPTION EFF PROCUREMENT UPA CODE SOURCE SCR WOODWORTH FIXTURE (ITW AC-5610) SCR SCR SCR SCR SCR SCR D,E,M, MV,P,R T,W,Y,Z C C C C C C C-SHANK ROLLING CONVERSION KIT • BASE • RING, CLAMP • PIN, LOCATOR • BLANK, SPACER • SPACER 0.3750 DIA. X 1 1/2 DOWEL PIN, REPLACED BY ITEM 350A 0.3750 DIA. X 1 1/2 DOWEL, REPLACES ITEM 350 FACE PLATE WELDMENT MOTOR MOUNTING BLOCK COUPLING (BOSTON FC15 X 3/4") COUPLING INSERT (BOSTON XFCR X 3/4") COUPLING INSERT (BOSTON XFCR-15) ALTERNATE FOR ITEM 385 RIGHT ANGLE GEAR MOTOR RELAY MOUNTING PLATE RELAY MOUNTING PLATE, ALTERNATE FOR ITEM 400 AIR-OIL BOOSTER GAGE (NOSHOK 25.300-3000 PSI/BAR GAGE 1/4 BOTTOM CONN.) 90 DEGREE ELBOW (CAJON S-4-SE) WIRE (18 MTW 600V WHITE) WIRE (18 MTW 600V RED) WIRE (18 MTW 600V BLACK) FITTING (PARKER 91 SERIES 10191-4-4) DOWEL PIN FITTING (PARKER 91 SERIES 0691-4-4) ROLLER HEAD MOTOR #8-32 X 1 1/4 SOCKET HEAD CAP SCREW MOTOR MOUNTING BLOCK 1/4-20 X 1 SOCKET HEAD CAP SCREW #10-32 X 1/2 FLAT HEAD CAP SCREW #10-24 X 1/2 SOCKET HEAD CAP SCREW 1/4-20 X 2 SOCKET HEAD CAP SCREW -340A -342 -344 -346 -348 -349 350 106542 DT-1724+171 DT-1724+172 DT-1724+173 104811 BST-2869-1 DT-1724-35 350A STANDARD* 360 370 380 385 385A DT-1724+36 DT-1724+37 DT-1724+38 DT-1724+38A DT-1724+38A NCR NCR NCR 390 400 400A DT-1724+39 DT-1724+40 DT-1724+40A SCR NCR NCR 410 420 DT-1724+41 DT-1724+42 SCR SCR 430 -440 -450 -460 -470 480 -490 500 510 520 540 550 570 590 DT-1724+43 DT-1724+44 DT-1724+45 DT-1724+46 DT-1724+47 B-6138-6-7 DT-1724+49 DT-1724+50 STANDARD* DT-1724+52 STANDARD* STANDARD* STANDARD* STANDARD* EFFECTIVITY SCR SCR MODEL EFFECTIVITY MODEL R T W Y Z "R" Shank "T" Shank "W" Shank "Y" Shank "Z" Shank C "C" Shank D "D" Shank E "E" Shank M "M" Shank MV "MV" Shank P "P" Shank - ITEM NOT ILLUSTRATED * STANDARD - GRADE 5 OR BETTER V 1 HPI HPI HPI HPI HPI HPI V 1 1 1 1 1 1 2 V 2 HPI HPI V V V 1 1 2 1 1 HPI M M 1 1 1 HPI V 1 1 V NA NA NA V V V HPI V HPI V V V V 4 AR AR AR 1 2 1 1 2 1 2 2 8 2 DT-1724-3(F) Rolling Machine ILLUSTRATED PARTS LIST 61-00-28 Page 6-13 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 FIG./ITEM NUMBER PART NUMBER REPLACEMENT CODE 6-1, 6-2, 6-4 600 DT-1724+60 600A STANDARD* 610 620 630 640 650 DT-1724+61 STANDARD* STANDARD* STANDARD* 6139680400 660 660A -670 DT-1724+66 DT-1724+66A DT-1724+67 SCR SCR SCR 680 DT-1724+68 SCR 680A DT-1724+68A SCR 690 DT-1724+69 NCR 700 710 720 730 DT-1724+70 DT-1724+71 STANDARD* DT-1724+73 NCR NCR 740 DT-1724+74 HPI 750 STANDARD* 760 BST-4051 HPI 780 DT-1724+78 790 STANDARD* 800 DT-1724+80 HPI 810 DT-1724+81 820 DT-1724+82 820A STANDARD* 830 DT-1724+83 840 850 860 DT-1724+84 STANDARD* DT-1724+86 EFFECTIVITY SCR MODEL DESCRIPTION EFF PROCUREMENT UPA CODE SOURCE 0.5000 DIA. X 1 3/4 DOWEL PIN, REPLACED BY ITEM 600A 0.5000 DIA. X 1 3/4 DOWEL, REPLACES ITEM 600 SWITCH MOUNTING BRACKET SET SCREW (CUP POINT 1/2-13 X 3/4) 1/2-13 X 1 1/2 SOCKET HEAD CAP SCREW 1/2 FLAT WASHER CAPACITOR (NEWARK #151511) REFURBISHMENT ONLY PILLOW BLOCK (TIMKEN QMP08J107SM) PILLOW BLOCK (REXNORD ZP5107 PIL BLK) HYDRAULIC HOSE ASSEMBLY (PARKER PARFLEX 919-4 X 36") PILLOW BLOCK (BROWNING PB221-1 7/16 BORE) PILLOW BLOCK (SEALMASTER 107-2 PIL BCK) MAIN POWER SWITCH (SQUARE-D 2510 FG-2) (MICRO SWITCH BZV6-2RN) START CYCLE SWITCH SWITCH BRACKET 3/8-16 X 1 SOCKET HEAD CAP SCREW CARRIAGE SWITCH (MICRO SWITCH BZ-2RDS5551-A2) SHAFT (THOMSON) CLASS "L" 1.2495/1.2490 DIA. X 13.00 SOCKET HEAD CAP SCREW, 3/8-16 X 1 INCH BEARING (WARNER SW20UU) "L" GIB 0.5000 DIA. X 3/4 DOWEL SUPPORT BLOCK SHIM 0.3125 DIA. X 1 1/4 DOWEL, REPLACE BY ITEM 820A 0.3125 DIA. X 1 1/4 DOWEL, REPLACES ITEM 820 CARRIAGE SWITCH (FOR BLADE DRIVE MOTOR) - (MICRO SWITCH BZ-2RW8299-A2) MOUNTING PLATE 3/8-16 X 1-1/2 SOCKET HEAD CAP SCREW SPACER, BEARING BLOCK EFFECTIVITY V 1 V 1 M V V V V 1 6 6 6 2 V V V 1 1 1 V 1 V 1 V 1 V M V V 1 1 2 1 NA 2 V NA M V NA HPI V 22 4 2 1 1 2 6 V 6 V 1 M V M 1 1 1 MODEL - ITEM NOT ILLUSTRATED * STANDARD - GRADE 5 OR BETTER DT-1724-3(F) Rolling Machine ILLUSTRATED PARTS LIST 61-00-28 Page 6-14 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 FIG./ITEM NUMBER PART NUMBER 6-1, 6-2, 6-4 870 -880 890 900 910 920 930 940 950 960 970 980 990 1000 1010 1040 1040A DT-1724+87 DT-1724+88 STANDARD* STANDARD* DT-1724+91 DT-1724+92 DT-1724+93 DT-1724+94 DT-1724+95 DT-1724+96 C-3317-113 DT-1724+98 STANDARD* DT-1724+100 DT-1724+101 DT-1724+104 DT-1724+104A 1050 1060 1070 1080 1090 1100 1110 1120 1130 1150 1170 REPLACEMENT CODE NCR NCR HPI HPI HPI HPI HPI SCR HPI HPI HPI HPI DT-1724+104 HPI DT-1724+106 HPI DT-1724+107 DT-1724+108 AST-2868 NCR BST-2872 NCR DT-1724+111 HPI DT-1724+112 SCR DT-1724+113 SCR DT-1724+115 STANDARD* -1180 -1180A DT-1724+118 DT-1724+118 -1190 1200 1210 DT-1724+119 DT-1724+120 STANDARD* 1220 -1230 1240 DT-1724+122 DT-1724+123 DT-1724+124 EFFECTIVITY NCR NCR HPI NCR MODEL DESCRIPTION EFF PROCUREMENT UPA CODE SOURCE SPACER, BEARING BLOCK HANDLE 0.3750 DIA. X 3 DOWEL 3/8-16 X 3 1/2 SOCKET HEAD CAP SCREW COVER, ROLLING HEAD WORM HOUSING BUSHING BLOCK SUPPORT FRAME PLUNGER SPRING O-RING PISTON 0.2500 DIA. X 1 3/4 DOWEL PIN BACKING PLATE CARRIAGE SHAFT SUPPORT BLOCK (THOMSON SB-20) SHAFT SUPPORT BLOCK (THOMSON SB-20) ALTERNATE FOR ITEM 1040 SHAFT SUPPORT BLOCK (THOMSON SB-20) PIVOT BLOCK SPACER SPACER PLATE ROLLING MACHINE SPACER SPACER (HARTZELL) ROLLER ARM ROLLER BEARING RISER BLOCK 0.500 DIA X 1/2 SOCKET HEAD SHOULDER SCREW MUFFLER (SHRADER 4604-0004) MUFFLER (PARKER EM25), ALTERNATE FOR ITEM 1180 LINK ARM SWITCH BRACKET 0.375 DIA. X 5/8 SOCKET HEAD SHOULDER SCREW SWITCH MOUNTING BRACKET CABLE CONNECTORS (ARLINGTON 8402) RELAY (SQUARE-D CLASS 8501 TYPE KP-12-V20) EFFECTIVITY M M V V M NA NA NA NA NA HPI NA V M NA NA NA 1 1 2 6 1 1 1 1 1 1 2 1 1 1 1 3 3 NA NA HPI HPI HPI V NA HPI HPI M V 1 1 2 1 1 1 1 1 1 1 1 V V 1 1 HPI M V 1 1 2 NA V V 1 8 1 MODEL - ITEM NOT ILLUSTRATED * STANDARD - GRADE 5 OR BETTER DT-1724-3(F) Rolling Machine ILLUSTRATED PARTS LIST 61-00-28 Page 6-15 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 FIG./ITEM NUMBER PART NUMBER 6-1, 6-2, 6-4 1250 DT-1724+125 REPLACEMENT CODE NCR 1260 -1270 1280 B-3857-WCJ15 DT-1724+127 DT-1724+128 NCR NCR SCR -1290 -1290A DT-1724+129 DT-1724+129 NCR NCR -1300 1330 DT-1724+130 DT-1724+133 NCR NCR 1330A DT-1724+133 NCR -1340 1350 1360 1370 1380 -1390 DT-1724+134 DT-1724+135 HPI DT-1724-136 NCR DT-1724+137 NCR DT-1724+138 HPI DT-1724+139 -1400 1420 -1430 1440 -1450 STANDARD* DT-1724+142 DT-1724+143 STANDARD * DT-1724+145 NCR -1460 1470 1470A DT-1724+146 DT-1724+147 DT-1724+147A NCR NCR 1480 1480A DT-1724+148 DT-1724+148A NCR NCR -1490 DT-1724+149 NCR -1500 -1510 -1520 -1530 1540 1550 AST-2865-1 AST-2865 BST-2866 NCR BST-2866-1 NCR AST-2867-2 AST-2867-1 EFFECTIVITY MODEL DESCRIPTION EFF PROCUREMENT UPA CODE SOURCE RELAY (SQUARE-D CLASS 8501 TYPE KP-13-V20) MS21919WCJ15 HOSE CLAMP FITTING (SWAGLOK B-500-2-4) CARRIAGE RETURN MOTOR (1 RPM 115VOLT, 7 WATT, 60 HZ (HURST MODEL "T" T2602-001) MUFFLER (CMF 1/8) (SHRADER 4602-0002) MUFFLER (CMF 1/8) (PARKER EM12), ALTERNATE FOR ITEM 1290 OVERLOAD RELAY (SQUARE-D A985) F.R.L. UNIT (WILKERSON C02-02-000) SUPERSEDED BY ITEM 1330A F.R.L UNIT (WILKERSON D03-02-G000), SUPERSEDES ITEM 1330 0-160 PSI PRESSURE GAUGE DRIVE SHAFT SPACER, FACEPLATE (HARTZELL) BOOSTER MOUNTING PLATE NEEDLE BEARING (TORRINGTON B-1612) TERMINAL CONNECTORS (ALLIED ELECTRONICS CO. ST-11A-BG #6STUD) PIPE PLUG 1/8" NPT FITTING (CAJON S-4-RB-2) 45 DEGREE ELBOW - (PARKER 1/8CD45-S) #8-32 X 1/8 SOCKET SET SCREW HOSE CLAMP (BURNDY 555443) CAT # RK224-2 WIRE NUTS (NEWARK 59F1111) RELAY SOCKET (SQUARE-D 8501NR52) RELAY SOCKET, SHORT (SQUARE-D 8501NR51) RELAY SOCKET (SQUARE-D 8501NR62) RELAY SOCKET, SHORT (SQUARE-D 8501NR61) WIRE AND PLUG ASSEMBLY (NEWARK 37F3290) SPACER 0.3750 RADIUS SPACER 0.3500 RADIUS EXPANSION SLEEVE EXPANSION SLEEVE SPACER SPACER EFFECTIVITY V 1 V V V 2 1 1 V V 1 1 V V 1 1 V 1 V NA M M NA V 1 1 1 1 2 22 V V V V V 1 1 1 8 4 V V V 6 1 1 V V 1 1 V 1 HPI HPI HPI HPI M M 1 1 1 1 1 1 MODEL - ITEM NOT ILLUSTRATED * STANDARD - GRADE 5 OR BETTER DT-1724-3(F) Rolling Machine ILLUSTRATED PARTS LIST 61-00-28 Page 6-16 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 FIG./ITEM NUMBER PART NUMBER 6-1, 6-2, 6-4 1560 -1570 1580 1590 -1600 -1610 -1620 -1630 -1640 1650 1660 1690 1700 1710 -1720 AST-2867 BST-2869 DT-1724+158 STANDARD* DT-1724+160 DT-1724+161 DT-1724+162 DT-1724+163 DT-1724+164 STANDARD* STANDARD* STANDARD* STANDARD* STANDARD* 7810402023 EFFECTIVITY REPLACEMENT CODE NCR NCR NCR NCR NCR MODEL DESCRIPTION EFF PROCUREMENT UPA CODE SOURCE SPACER SPACER FITTING (SWAGLOK S-500-2-4) 3/8-16 X 2 1/4 SOCKET HEAD CAP SCREW COLLET SCREW FOR "E" SHANK "E" SHANK COLLET "E" SHANK SPACER ADAPTER USAGE CHART SPACER, "MV" SHANK 5/16-18 X 1.00 SOCKET HEAD CAP SCREW 1/4-20 X 1.50 SOCKET HEAD CAP SCREW #10-24 X 1 1/4" SOCKET HEAD CAP SCREW #10-24 FLAT WASHER 1/16 X 0.375" SPRING PIN 40x20x3 ROLL MACH CRATE EFFECTIVITY M M V V HPI HPI HPI HPI M V V V V V 1 1 1 2 1 1 1 1 2 2 2 2 2 2 1 MODEL - ITEM NOT ILLUSTRATED * STANDARD - GRADE 5 OR BETTER DT-1724-3(F) Rolling Machine ILLUSTRATED PARTS LIST 61-00-28 Page 6-17 Rev. 3 Jun/23 HARTZELL BLADE SHANK ROLLING MACHINE MAINTENANCE MANUAL 128 FIG./ITEM NUMBER 6-3 PART NUMBER REPLACEMENT CODE 770 DT-1724+77 NCR 1670 1680 DT-1724+167 DT-1724+167A EFFECTIVITY F DESCRIPTION EFF PROCUREMENT UPA CODE SOURCE TRANSFORMER (STANCOR GSD1500) (MAGNETEX TRIAD AN9MG) (HAMMOND MANUFACTURING 175G-NA) BLOCK, TAP BLOCK, TAP MODEL EFFECTIVITY F V 1 F F M M 1 1 MODEL DT-1724-3F ONLY - ITEM NOT ILLUSTRATED * STANDARD - GRADE 5 OR BETTER DT-1724-3(F) Rolling Machine ILLUSTRATED PARTS LIST 61-00-28 Page 6-18 Rev. 3 Jun/23
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )