1) What are the sources of risk associated with project development?
Sources of risk associated with project development include market risks and project risks.
Market risks are the result of unexpected changes in general market conditions affecting the
supply and demand for space. Project risks are the result of choosing a specific location to
develop a property and the design of the project.
2) What are some development strategies that many developers follow? Why do they follow such
strategies?
Business strategies used by developers can be categorized in three general ways: 1) owning and
managing projects for many years, 2) selling projects after the lease-up phase, and 3) developing
land and buildings for lease in a master-planned development or “build to suite” for single
tenants. Following a particular strategy allows the developer to have a balance between use of
external contractors, architects, real estate brokers, leasing agents, and property managers and
having this expertise within the firm.
3) Describe the process of financing the construction and operation of a typical real estate
development. Indicate the order in which lenders who fund project development financing are
sought and why this pattern is followed.
In general, developers must first line up permanent (long-term) financing that will be used once
the project is complete and being operated with tenants before they can get a construction
loan. It is necessary that the construction loan is repaid when the permanent loan takes over.
4) What contingencies are commonly found in permanent or take-out loan commitments? Why are
they used? What happens if they are not met by the developer?
Contingencies commonly found in permanent or take-out loan commitments include: 1) a
maximum amount of time to obtain a construction loan commitment, 2) a date for completion
of construction, 3) minimum rent-up (leasing) requirements and an approval of major leases, 4)
an expiration date of the permanent loan commitment and any provisions for extensions, and
5) an approval by the permanent lender of design changes and substitution of any building
materials.
5) What is a mini-perm loan? When and why is this type of loan used?
A mini-perm or bullet loan is a construction loan that, in effect, becomes permanent financing
when construction is complete. When construction is complete, the developer begins to make
payments (principal and interest) similar to those made on permanent financing with the
exception that the loan typically has a 3 to 5 year maturity with the balance (balloon payment)
due at that time.
6) Why don’t permanent lenders usually provide construction loans to developers? Do construction
lenders ever provide permanent loans to developers?
Permanent lenders are often national companies, such as large insurance companies, that do
not have the in-house capability of underwriting construction loans and monitoring a project
during construction. Thus, construction loans are typically made by lenders, such as commercial
banks with a local presence. Construction lenders, on the other hand, may be willing to make a
permanent loan, although they may find it more profitable to focus on construction loans or
mini-perms.
7) What is the major concern construction lenders express about the income approach to
estimating value? Why do they prefer to use the cost approach when possible? In the latter case,
if the developer has owned the land for five years prior to development, would the cost approach
be more effective? Why or why not?
The income approach usually provides a good indication of the expected value of an incomeproducing property once construction is complete and it has been leased-up. The projected
value should exceed construction costs, if this is not the case, the project is not feasible and the
loan should not be made. Assuming that the project is feasible, using the cost approach would
provide a more conservative estimate of value, especially if the land has appreciated in value
from its original cost to the developer.
8) You work for a lender and a developer has requested a loan such that they are able to draw
$20,000 for construction expenses at the beginning of each month for 10 months. You have
informed him the land where the property is being constructed will serve as the collateral and
the loan will cost 0.75% per month with no payments being due until the end of 10 months.
There is also a 3% origination fee based on the ending balance of the loan. What would be the
amount due at the end of 10 months to the lender of this construction loan?
FV of draws (calc in BGN mode)
N = 10
I = 0.75
PV = 0
PMT = -20,000
CPT FV = 208,438
Origination Fee
=208,438 * .03 = 6,253
FV of draws + Origination fee = Total Amount Due
= 208,438 + 6,253 = $214,691
9) In the previous question, what is the lender’s (monthly) IRR? [hint: a timeline is very helpful
here]
CF0 = -20,000
C01 = -20,000
F01 = 9
C02 = 214,691
F02 = 1
IRR CPT = 1.28% (monthly)
annual 15.36%
10) What is an option contract? How is it used in land acquisition? What should developers be
concerned with when using such options? What contingencies may be included in a land option?
Option contracts are used to reserve a parcel of land so that it will not be sold to someone else,
while the developer does preliminary analysis of the site. The developer should be concerned
about the price of the option and the length of time until a decision is made. Contingencies
might include passing an environmental inspection, being able to get the land rezoned, or
receiving any necessary permits for development.
11) What are the unique risks of land development projects from the developer’s and lender’s points
of view?
Land development can be quite risky for both the developer and the lender, especially when
compared to existing projects. During the development period, a developer must be concerned
about changing market conditions that subsequently affects the price and rate at which parcels
are sold. The cost to develop the site can also be greater than anticipated. Ultimately, the same
factors affect the lender’s risks because proceeds from the sale of parcels are used to repay the
loan. Lenders get paid as lots are sold. As a result, the rate at which lots sell affects the
lender’s as well as the developer’s rate of return. A higher release price might reduce this risk to
the lender. However, if the release price is too high, the developer may not have sufficient
funds to successfully develop the project.
12. An analysis of whether land can be purchased and developed profitably is known as:
(A) Financial analysis
(B) Feasibility study
(C) Turnkey study
(D) Project profitability
13. True or False: The release price is usually calculated to pay off the loan when the last lot is sold.
False.