RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices Title WORKOVER BEST PRACTICES Prepared by CMS Prodex Dr Miso Solesa Technical Consultant Content checked by DA-PO-WO Department Ivan Vukov Department Manager Content reviewed by CII Consulting Harald Zetche Technical Consultant Approved WO&WI BU DA-Operation Roland Perdacher Senior Head of Operations WO/WI BU Urlich Winter Director of Workover & Well Intervention BU DA Gabriel Selischi Director of Domestic Asset Business Unit Organizational Entity Name/Title http://www.petrom.com Date Signature RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices WORKOVER BEST PRACTICES OMV Petrom continuous drive towards quality and performance improvement includes among others the need for definition of workover standards. Known the importance and the complexity of the workover operations in OMV Petrom Romania, bringing them to international industry standards level is mandatory. Thus workover standards have been defined within SIRIUS II project and they include the Workover Best Practices (the design phase, or ‘what is to be done’), the Workover Procedures (the execution phase, or ‘how to perform workover operations’) and the Workover Rules (the basic workover principles). The document herewith represents the Workover Best Practices developed and released in 2012. Workover Best Practices is a technical document containing information regarding most applicable engineering solutions, equipment and tools used during workover operations of oil, gas and injection wells. This document has been developed & compiled by an external technical consultant based on current OMV Petrom workover practices, worldwide recognized workover practices & standards, as well as on latest developments in workover and well service technologies. During preparation of WO Best Practices there was a continuous communication between different parties and technical authorities. Among them DA HQ Production Operation’s ‘Well Completion’ department, ‘Sand Control & Stimulation’ department, ‘Production Optimization’ department and ‘Workover’ department, moreover WO/WI BU HQ, as well as field experts from both DA Operation and WO/WI BU (Assets). OMV Austria Workover & Drilling department technical staff has also contributed during preparation of the WO Best Practices. In total there are ten specific areas of workover best practices with detailed information regarding the specific topics. Each of these best practices has also an Executive Summary in order to guide the reader through the main ideas and focus onto most important practices. This document is primary addressed to the engineering staff involved in the workover design, planning and program preparation - both Operations and Services. Furthermore other parties involved into well operation and subsurface maintenance process will also benefit from WO Best Practices document. OMV Petrom E&P staff will have to ensure that these WO Best Practices are implemented and will be used on regular bases during workover operations. OMV Petrom Workover Best Practices is intended to be a ‘live’ document. With development of new technologies and changes of the working environment this document will be updated accordingly. http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices Content 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. GENERAL INTRODUCTION WORKOVER BEST PRACTICES METHODOLOGY RIG SPECIFICATIONS WELL CONTROL WELL RECOMPLETION PERFORATING TECHNOLOGICAL OPERATIONS WELL REPAIR STIMULATION BY ACIDIZING SAND CONTROL STIMULATION BY FRACTURING ZONAL ISOLATION http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 1. GENERAL INTRODUCTION 1. GENERAL INTRODUCTION Contents 1. GENERAL INTRODUCTION ................................................................................................................ 1-1 1.1 Purpose of the Manual ............................................................................................................ 1-1 1.2 Contents ................................................................................................................................... 1-2 1.2.1 Source of Information........................................................................................................ 1-2 1.2.2 Ownership.......................................................................................................................... 1-2 1.2.3 Confidentiality ................................................................................................................... 1-2 1.3 Updating, Amendment and Control ........................................................................................ 1-2 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 1. GENERAL INTRODUCTION 1. GENERAL INTRODUCTION The latest initiative for WO Services improvement for the period of 2012-2016, as part of the SIRIUS II Project Continuation, calls for preparation of Workover Standards in OMV Petrom. The essential part of WO Standards is the WO Best Practices Manual (sub-project). This document has been created to provide a comprehensive description of WO services, equipment, conditions and other requirements for safe and professional WO operation within OMV-Petrom Romania. The Best Practices are non-binding company recommendations. All employees, active in field operations, should, however, get acquainted with those Best Practices relevant to their responsibilities. More detailed information can be found in subsequent sections of this document. 1.1 Purpose of the Manual This comprehensive manual has been compiled with the main purpose of serving as a guide to Workover Operations (WO) personnel and a reference to new Workover Engineers. The most common OMV Petrom WO have been presented in this document to familiarize the reader with the actual workover Best Practices (BP) achieved in OMV Petrom and step by- step technology procedures to plan workover operations and to select the best technology and sequences required for preparing a detailed technical program in order to start with the job execution. This document is written in such a way that it is clear, easy to follow; it uses acceptable oilfield terminology, and the information is current and very specific for Petrom OMV operations. Additionally, the purpose of this document is to guide OMV Petrom experienced engineers of all technical disciplines how to implement efficiently the best practices and workflows in the process of planning, designing, executing, supervising and monitoring results of workover operations and its importance on achieving the targeted KPI. These, in consequence, have a large impact on costs and field profit. The Corporate Standards in this document define the requirements, methodologies and rules that enable the operation to be uniform and in compliance with the Corporate Company principles. This, however, makes each individual part of the WO processes capable to operate according to local laws or particular environmental conditions. The final aim is to improve performance and efficiency in terms of safety, quality and costs by providing common guidelines in all domestic assets in Romania where OMV Petrom operates to all personnel involved in Workover activities. The approach to WO has to be interdisciplinary, involving Drilling, Completion, Reservoir and Petroleum Production Engineering. This is vital in order to perform WO operation successfully and to obtain as much as possible incremental oil and gas production by utilizing the recommended best practices. This WO BP will guide the engineers and technicians of varies disciplines through the process with the objectives of helping them make the key decisions and obtain the optimum design to maximize productivity and, hence a profit. Many of the decisions made by the various disciplines are interrelated and impact the decisions made by other disciplines. For instance, the decision about the WO sequences and required technology may subsequently be changed due to the availability of well servicing and/or workover techniques, as well as by constraints caused by reservoir and well condition. This provides a system of ongoing workover optimization to suit changing conditions, increased knowledge of the field and incorporate new technologies. http://www.petrom.com 1-1 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 1. GENERAL INTRODUCTION 1.2 Contents 1.2.1 Source of Information The information contained in this manual has been collected from many different sources. These include: Petrom OMV workover technical programs, standards, procedures, working instructions workover, completion and production manuals, Service companies’ manuals and catalogues and field oil industry recognized standards (API, ISO, etc.) and other sources. 1.2.2 Ownership OMV Petrom is the sole owner of the information in this document. Any alterations or future updates of Workover Best Practices shall be done only OMV Petrom Exploration and Production staff. Internal Project team resources are: 1. Domestic Assets (DA) HQ Production Operation’s departments. • Workover, • Completion, • Sand Control and Stimulation, and • Production Optimization. 2. Workover/Well Intervention Business Unit (WO/WI BU) HQ. 3. Field experts from both DA Operation and WO/WI BU (Assets). External engineering support is provided by consulting company CMS Prodex. 1.2.3 Confidentiality The information in this document has been prepared for OMV Petrom and cannot be distributed outside the company. This document is the property of OMV Petrom and all rights are reserved. Neither the whole nor any part of this document may be reproduced, stored in any retrieval system or transmitted in any form or by any means (electronic, mechanical, reprographic, recording or otherwise) without the prior written consent of the copyright owner. Hard copies of the Workover Best Practices will be distributed within OMV-Petrom DA Production Operations. Copy of the WO Best Practices Manual will be stored in electronic form on the OMV – Petrom server for easy access 1.3 Updating, Amendment and Control The Corporate Standards in this document define the requirements, methodologies and rules that enable to operate uniformly and in compliance with the Corporate Company Principles. This, however, still enables each individual parties of the WO process to operate according to local laws or particular environmental conditions. OMV Petrom Workover Best Practices has to be periodically updated to reflect changing field conditions, application of new technologies and techniques. Suggested changes should be forwarded for reviewing and inclusion in the next version of the document. 1-2 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 2. WORKOVER BEST PRACTICES METHODOLOGY 2. WORKOVER BEST PRACTICES METHODOLOGY Contents 2. WORKOVER BEST PRACTICES METHODOLOGY ................................................................................ 2-1 2.1 Introduction ............................................................................................................................. 2-1 2.2 Workover Process Definition and Description......................................................................... 2-2 2.3 Workover Objectives and Functions ........................................................................................ 2-3 2.4 Workover Best Practices Methodology ................................................................................... 2-3 2.5 Workover Categorization in OMV Petrom ............................................................................... 2-4 List of Figures ....................................................................................................................................... 2-6 List of Tables ......................................................................................................................................... 2-6 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 2. WORKOVER BEST PRACTICES METHODOLOGY 2. WORKOVER BEST PRACTICES METHODOLOGY 2.1 Introduction After a well is drilled to the final depth, the production casing and wellhead are set, cemented, and pressure tested. Any subsequent operations for preparing well for long production life are referred to as well completion. However, changes might occur in the reservoir, nearwellbore zone and the completion equipment itself could be damaged. Therefore it becomes necessary to service or workover the well so to maintain/improve oil and gas production or performance of injection well. Well workovers involve a wide variety of operations that often require a number of contractors, technical services, and suppliers working together at the wellsite. These operations must be planned and executed by qualified and competent people at all levels to ensure the safety of workers and public, protect the environment, and conserve natural resources. The well owner or assets conducting these operations have overall responsibility for achieving these goals. The wellsite supervisor plays a key role by directing and coordinating all workers at the wellsite to implement the planned workover activities, defined by the detailed technical program. This document is focused on Workover Best Practices in OMV Petrom and explains why wells need workover and repairs, which technologies and techniques should be used and what benefits could be expected as a result of workover operation. It also gives the best practices for sequences of various WO categories and the well control equipment that is to be used for safe and reliable WO. Numerous developed technology workflows bring at glance the best practices for each workover operations and direct a user through all phases of workover operations (well candidate selection, planning, execution, monitoring/real time control and postjob evaluation). The comprehensive workover process implemented in OMV Petrom is described in document “Wells Operation and Maintenance Process of OMV Petrom E&P and ESP” (C-06-01-E) and here is a briefly outlined workover system approach implemented in OMV Petrom (Figure 2-1). http://www.petrom.com 2-1 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 2. WORKOVER BEST PRACTICES METHODOLOGY Figure 2-1 WO process implemented in OMV-Petrom 2.2 Workover Process Definition and Description The term workover refers to a variety of remedial operations performed on a well to maintain, restore, or improve productivity. Workover operations include such jobs as replacing damaged tubing, recompleting to a higher zone, acidizing nearwellbore damage, plugging and abandoning a zone, etc. The term “well intervention” refers to workover operations performed through the Christmas tree with the production tubing in place. Coiled tubing, small-diameter tubing, wireline, and snubbing work strings can be used for special technological operation requirements. Many of these operations are similar to those in workovers but are constrained by the internal diameter (ID) of the existing well completion. 2-2 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 2. WORKOVER BEST PRACTICES METHODOLOGY 2.3 Workover Objectives and Functions Although there are various reasons for workovers, most of them can be grouped into six basic categories: • • • • • • Repair or replace damaged equipment. Repair natural damage within the well. Recomplete to another zone. Increase production from an existing zone. Convert well from production to injection. Replace artificial-lift equipment. 2.4 Workover Best Practices Methodology As shown in the Figure 2-2 below, the applied methodology for writing best practices consists of several steps: WO process definition and description in OMV Petrom E&P and WO/WI BU (Assets) • • • • • • WO types/categories Best Practice content definition Development of detailed technology workflows Downhole and surface equipment specifications dependent on well conditions Quality assurance and HSE requirements Technology and technical details and specifications Figure 2-2 WO Best Practices Methodology http://www.petrom.com 2-3 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 2. WORKOVER BEST PRACTICES METHODOLOGY 2.5 Workover Categorization in OMV Petrom Based on previously mentioned reasons for workover, OMV Petrom has categorized all workover operations which have been used for writing ten various best practices. The table 2.1 show the main WO categories for which all required and systemized information have been collected and written as Best Practices document. Table 2-1 WO Categorization WO Category/Operation Subcategory Well Control Well Recompletion Perforating Technological Operations Well Repair Stimulation by Acidizing Stimulation by Fracturing 2-4 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 2. WORKOVER BEST PRACTICES METHODOLOGY WO Category/Operation Subcategory Sand Control Zonal Isolation http://www.petrom.com 2-5 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2. WORKOVER BEST PRACTICES METHODOLOGY List of Figures Figure 2-1 WO process implemented in OMV-Petrom, Figure 2-2 WO Best Practices Methodology. List of Tables Table 2-1 WO Categorization. 2-6 http://www.petrom.com 2012 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 3. RIG SPECIFICATIONS 3. RIG SPECIFICATIONS Contents 3. RIG SPECIFICATIONS ......................................................................................................................... 3-1 3.1 Introduction ............................................................................................................................. 3-1 3.2 Overview of Workover Rigs Activities ...................................................................................... 3-1 3.3 Workover Rigs Data Sheets...................................................................................................... 3-2 3.4 Selection of a Workover Rig................................................................................................... 3-17 List of Figures ..................................................................................................................................... 3-19 List of Tables ....................................................................................................................................... 3-19 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 3. RIG SPECIFICATIONS 3. RIG SPECIFICATIONS 3.1 Introduction An important factor influencing the overall cost and success of workover job is the proper choice of a workover rig to do the job. The primary objective of this WO best practice is to outline the most important factors impacting to allocate properly the available workover rigs according to the job specifications. Failure to utilize the proper rig even if operations are delayed several days, results in additional rig time, special tool rental and costly mistakes. Currently, the total of 424 rigs, from which 337 are active and 87 inactive or temporally suspended, is deployed in OMV Petrom. 3.2 Overview of Workover Rigs Activities WO rigs, WO Operations, number and durations of WO operations for 2011 are shown in charts below (Figure 3-1 and Figure 3-2). As it can be seen from the charts below the total number of workover operation were completed with available rigs is 1450. Almost 30% of the total operation belongs to recompletion of the wells. Around 20% of the operation belongs to category of “others” what could cause some problems in proper job planning and rig selection. Figure 3-1 Number of Workovers by job Type http://www.petrom.com 3-1 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 3. RIG SPECIFICATIONS Figure 3-2 Number of Jobs per Rig and Job Type 3.3 Workover Rigs Data Sheets During the life of the well, it becomes necessary at times to perform WO rig work that requires rig equipment to be operated near the designed limit. If this limit is exceeded, then the equipment is likely to fail thus causing financial loss and delays in the WO operations. It is common practice to review the rig equipment specifications in order to operate within its capabilities and limitations. Each and every rig is supplied with different equipment. The main groups of components used for rig specification are: 1. General Information 2. Rig equipment 3. Rig power 4. Mud system & pump 5. BOP equipment (see Chapter 4. Well Control ) Important information about a rig is the depth limitation or capacity. Every piece of equipment has a maximum operating limit before failure occurs. In the case of the rig depth limitation, it is based on the load the derrick structure can sustain during operations. The limit is calculated based on the drill pipes and tubing (weight) to be run, additional equipment on the drill pipe, and the amount of over pull which might be needed in case of getting stuck. There are also safety factors included in the limitation to account for normal wear and tear. The rig specification sheets are generated using currently available information and for these reasons, it is important to update the proposed specification data sheets in Tables from Table 3-1 to Table 3-14 every time the WO Best Practice is revised. 3-2 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 3. RIG SPECIFICATIONS The complete specification, transport, rig-up, rig-down with detailed job procedures and safety regulation is written in document titled “TRANSPORTUL, MONTAREA SI DEMONTAREA INSTALATILLOR DE LUCRU LA SONDA” This document has been issued by OMV Petrom EP WO &WI BU during 2011. Table 3-1 WO Rig type TP 7.5 Specification http://www.petrom.com 3-3 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 3. RIG SPECIFICATIONS Table 3-2 WO Rig Type TP 10 Specification 3-4 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 3. RIG SPECIFICATIONS Table 3-3 WO Rig Types EC 5 T/EL/ERT Specification http://www.petrom.com 3-5 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 3. RIG SPECIFICATIONS Table 3-4 WO Rig Type TW 30 Specification 3-6 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 3. RIG SPECIFICATIONS Table 3-5 WO Rig type TW 32 Specification http://www.petrom.com 3-7 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 3. RIG SPECIFICATIONS Table 3-6 WO Rig Type TW 40 Specification 3-8 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 3. RIG SPECIFICATIONS Table 3-7 Rig type TW 50 Specification http://www.petrom.com 3-9 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 3. RIG SPECIFICATIONS Table 3-8 WO Rig Type TD 80 Specification 3-10 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 3. RIG SPECIFICATIONS Table 3-9 WO Rig type TW 100 Specification http://www.petrom.com 3-11 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 3. RIG SPECIFICATIONS Table 3-10 WO Rig type TD 125 Specification 3-12 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 3. RIG SPECIFICATIONS Table 3-11 WO Rig Type AM 10 Specification http://www.petrom.com 3-13 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 3. RIG SPECIFICATIONS Table 3-12 WO Rig Type AM 12-50 Specification 3-14 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 3. RIG SPECIFICATIONS Table 3-13 WO Rig type Rig 40 Specification http://www.petrom.com 3-15 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 3. RIG SPECIFICATIONS Table 3-14 WO Rig type AM 12-40 Specification 3-16 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 3. RIG SPECIFICATIONS 3.4 Selection of a Workover Rig Conventional workover rig equipment has been specialized and refined so that it is a common practice to choose rig to fulfill all expected phases in accomplishing the integrated workover operations. The flexibility of the rig is required because it could easily be reallocated from one to another location in order to optimize time and costs of operations. A number of factors will influence the selection of a workover rig including: • • • • • The nature of the operation to be conducted e.g. tubing size and hence the suspended weights of the tubing string, pressure control requirements for well re-entry, etc. Depth or load capacity ( rig capacities are commonly spoken of in terms of depth rating with a particularly size and rig capacity is primarily depends on braking capacity, derrick capacity, and drawworks power Logistical constraints - location of well, proximity to operating company base, availability, space on rig/platform, crane lift capacity. Economics - cost, availability and its impact on deferred production. Reservoir characteristics (type of fluid, fluid contaminants e.g. H2S content, pressure, temperature, fluid rate, depth of well etc.). To use workover unit properly it is advisable: • • • To release one type of rig and move in another more suitable to accomplish the particular job at hand especially for land operations. Avoid to use heavy-duty rigs to run small diameter tubing, Don’t use heavy-duty production rigs on shallow wells. Table 3-15 give practical recommendations how to choose workover rig properly considering the previous criteria and planned workover operations. http://www.petrom.com 3-17 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 3. RIG SPECIFICATIONS Table 3-15 Workover services 3-18 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 3. RIG SPECIFICATIONS List of Figures Figure 3-1 Number of Workovers by job Type, Figure 3-2 Number of Jobs per Rig and Job Type. List of Tables Table 3-1 WO Rig type TP 7.5 Specification, Table 3-2 WO Rig Type TP 10 Specification, Table 3-3 WO Rig Types EC 5 T/EL/ERT Specification, Table 3-4 WO Rig Type TW 30 Specification, Table 3-5 WO Rig type TW 32 Specification, Table 3-6 WO Rig Type TW 40 Specification, Table 3-7 Rig type TW 50 Specification, Table 3-8 WO Rig Type TD 80 Specification, Table 3-9 WO Rig type TW 100 Specification, Table 3-10 WO Rig type TD 125 Specification, Table 3-11 WO Rig Type AM 10 Specification, Table 3-12 WO Rig Type AM 12-50 Specification, Table 3-13 WO Rig type Rig 40 Specification, Table 3-14 WO Rig type AM 12-40 Specification, Table 3-15 Workover services. http://www.petrom.com 3-19 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL 4. WELL CONTROL Contents EXECUTIVE SUMMARY ......................................................................................................................... 4-1 4. WELL CONTROL ................................................................................................................................ 4-3 4.1 Introduction ............................................................................................................................. 4-3 4.1.1 Well Control Description ................................................................................................... 4-3 4.2 Well Control Principles............................................................................................................. 4-3 4.2.1 Barrier Concept .................................................................................................................. 4-5 4.3 Well Control Methods/Procedures ........................................................................................ 4-10 4.3.1 Well Shut-in ..................................................................................................................... 4-10 4.3.2 Well Killing ....................................................................................................................... 4-13 4.3.3 Non Circulating methods (bullheading, constant tubing pressure method…) ................ 4-19 4.3.4 Well Control Indications of Kicks ..................................................................................... 4-26 4.4 Downhole Equipment ............................................................................................................ 4-26 4.4.1 Special Equipment for Well Control ................................................................................ 4-26 4.5 Surface Equipment................................................................................................................. 4-27 4.5.1 Wellhead and Christmas Tree.......................................................................................... 4-27 4.5.2 Blowout Preventers (types, selection)............................................................................. 4-28 4.6 Workover Control Fluids ........................................................................................................ 4-38 4.6.1 Types of workover fluids used in Petrom OMV ............................................................... 4-38 4.6.2 Functions of WO Fluids .................................................................................................... 4-38 4.6.3 Workover Fluid Properties............................................................................................... 4-39 4.6.4 Components of WO fluids................................................................................................ 4-42 4.7 Well Control Workflow .......................................................................................................... 4-44 4.7.1 Well Control Best Practices Workflow Applied in OMV Petrom .................................... 4-44 4.7.2 Well Control Complications (Holes in Tubing, Reversing Gas Kicks, Problems with Circulating/Lost etc.) ....................................................................................................... 4-48 4.8 Quality and Safety Requirements for Well Control ............................................................... 4-50 4.8.1 Quality Control................................................................................................................. 4-50 4.8.2 Safety Assurance.............................................................................................................. 4-53 4.8.3 Personnel Requirements ................................................................................................. 4-54 Appendix 4 A Physical Properties of Potassium Chloride .............................................................. 4-55 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 4. WELL CONTROL Appendix 4 B Physical Properties of Sodium Chloride ................................................................... 4-57 Appendix 4 C Physical Properties of Calcium Chloride................................................................... 4-59 Appendix 4 D Physical Properties of Ammonium Chloride ............................................................ 4-63 List of Figures ...................................................................................................................................... 4-64 List of Tables ....................................................................................................................................... 4-65 References .......................................................................................................................................... 4-66 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 4. WELL CONTROL EXECUTIVE SUMMARY EXECUTIVE SUMMARY: 4. WELL CONTROL No. 1. Strongly Recommended If pipe rams are used, make sure the string is at the height that avoids closing the pipe ram on a tool joint or tubing connection across the stack. This height should be known in advance. The number of barriers depend on well category (see Page 7). 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Shut in and secure the well, circulate at least one bottom-up volume of the well to check for the presence of gas in the workover fluid. This step will require running tubing to the bottom if it is not already there. If this is an open-hole completion, leave the work string inside the casing. If the well has been taking fluid, consider spotting a fluid loss pill across the suspect zone. If the well was shut-in, before reopening the well, follow steps below: 1. Check the tubing string pressure gauge by opening its needle valve. If no pressure is registered on the gauge, check for flow past the safety valve. 2. Check the annulus pressure gauge. If no pressure is registered, check for annular flow. Normally, you should check for flow through the choke manifold. 3. If there is no pressure or flow on either the tubing or the annulus, is it safe to open the well? If there is pressure or flow, the well must be killed with the appropriate fluid and following the required procedure. Kill workover fluid should be compatible with the formation and the formation fluids in order to prevent swelling of clays and scale deposition and other problems that can permanently block the perforations or greatly reduce productivity. WO fluid should be in accordance with HSE regulation considering the potential impact of the presence of sour gases like H2S, CO2. If a reverse circulation is used as a killing method, the well should be circulated holding a back pressure on the formation so that a constant bottom hole pressure can be maintained to eliminate any further flow of reservoir fluid. Use volumetric method to manage gas when there is no tubing communication. Since tubing pressure cannot be read, the process must be controlled with the casing pressure and the volume of fluid bleed from the annulus. Select the best killing method which fits the well conditions, use workflow on Page 27 (Figure 4-12) All kicks should be treated as gas kicks until positive evidence shows otherwise. The stab-in valve (with appropriate thread configuration & tested) must be always available on the rig flore (RF) while POOH or RIH with workstring. Workover fluid weight needs to provide an overbalance at top perforations of 3,5 to 7 in order to protect the formation of excessive differential pressure and safe operations. http://www.petrom.com 4-1 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 4. WELL CONTROL EXECUTIVE SUMMARY: 4. WELL CONTROL No. 1. 2. 3. 4. 5. 4-2 Not Recommended at All To start workover operation in an H2S area (or potentially H2S area) without a written H2S Emergency Response Plan (ERP) and if this site plan for shut-in and evacuation is not properly understood by Site Supervisor and company personnel prior to rigging up any equipment on location. Do not allow any leaking of used barriers or used barriers which don’t fulfil the standard of acceptable leak rate per API RP 14B and RP 14H for Xmas tree valves. To continue with workover operation if the casing pressure decline. If this decline takes place, it is not allowed to continue the pump and the choke and shut in the well. That duration of barrier pressure tests (the maximum anticipated pressure plus adequate safety factor), be shorter than 10 minutes. To use barriers if during test period of 10 minutes there is pressure decline. To use any completion and treatment equipment and associated safety systems if the equipment is not tested for functionality. Carry out the pressure test upstream of the choke below the maximum anticipated working pressure and full working pressure downstream of the chokes. http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 4. WELL CONTROL 4. WELL CONTROL 4.1 Introduction Well control is one of the most important considerations of those who complete and perform workovers on wells that are being drilled. Because of the increased awareness of the need to prevent injury of personnel and to save the environment, well control during workover operations is of particular concern in OMV Petrom SA. A proper, reliable and safe well control is the most important step as a part of complete workover process intended to prevent the hazard and uncontrolled flow of liquid and/or gas (blowout) during workover operations. The principal purpose of this chapter is to define the process for controlling wellhead events (kicks, leak or other adverse situation which could lead to blowout if uncontrolled) during well servicing activities in the OMV Petrom fields. 4.1.1 Well Control Description Well control philosophy is to have pressure barriers that prevent uncontrolled flows of oil, gas or water to the surface or subsurface during workover operations. Barriers must be stand-alone and capable of acting independently, so that if one is removed the other is not affected. During a workover the Well-Site Supervisor (WSS) and crew must contain the formation fluids within the formation while remedial work is being carried out. An undesired flow of these fluids into the wellbore is called a kick. If a kick fluid enters and moves up the wellbore, it has a tendency to expand and unload fluid above it. This may result in an uncontrolled and potentially dangerous flow of formation fluids from the wellbore. There are three main goals of well control: • • • Prevention of kicks by maintaining wellbore hydrostatic pressure at a level equal to or slightly greater than formation pressure (primary well control) Early detection of kicks that do occur Initiation of corrective action to prevent kicks from developing into uncontrolled flow Have always, ready to use, appropriate surface equipment on the rig floor, in case a kick occurs. 4.2 Well Control Principles By applying the appropriate principles and calculations to the well control situation, the supervisor should be able to: • • • • • Interpret surface indicator data correctly. Eliminate small problems before they become bigger on the surface. Determine the controls needed to execute a workover kill operation. Choose the appropriate well control procedure for a given situation. Diagnose problems during well control procedures and take corrective action. http://www.petrom.com 4-3 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 4. WELL CONTROL Surface Indicators of Pressure Tubing and casing pressure gauges indicates pressure at surface and make it possible to conclude what the downhole pressures are and how they change with time. These pressure readings can be used for well control calculations. Monitoring these pressures can help in preventing burst casing, formation damage, lost circulation, and other well control problems. It is important, therefore, that they be reported accurately and monitored carefully. Two important pressure indicators are the Shut-In Tubing Pressure (SITP) gauge and the Shut-In Casing Pressure (SICP) gauge. The SITP gauge is connected to the bore of the tubing or work string. How you use the SITP reading depends on the circulation path that will be used to control the well. If the circulation is forward (down the tubing and up the annulus), then the well will be generally controlled over the long term with the tubing gauge. In addition to the SITP reading, the SICP reading will be used to assist in initially establishing circulation. Also, the SITP reading will be used to estimate pressure at the bottom of the well and to calculate the fluid weight needed to balance the well. The SICP gauge is connected to the annulus. Again, using the SICP reading depends on the circulation path. If the circulation path is reverse (down the annulus and up the tubing), then the well will be controlled over the long term with the annulus gauge. During certain specialized well control procedures, the SICP gauge reading is used to control bottomhole pressure when fluid must be pumped into the top of the well or bled out of the well. Friction Pressure and Principles Understanding the meaning of friction pressure and its effect and well control are important for complete managing of the process. At any segment of the circulation fluid path some pressure drop will occur because of friction and pump has to generate energy to overcome friction pressure or “pump pressure.” 1. In a workover with typical completion geometry, 65–95% of the friction is generated in the tubing and the remainder in the annulus. This is due to a higher fluid velocity inside the smaller tubing diameter compared with that in the larger annulus. 2. The total friction (and hence the pump pressure) does not change with the circulation path. Pump pressure will be the same whether forward circulating (down tubing, up annulus) or reverse circulating (down annulus, up tubing). 3. In reverse circulation, the friction pressure exerted on the formation perforations is equal to the total downstream resistance (i.e., the tubing friction). In forward circulation, the tubing friction pressure is expended by the time the fluid reaches the end of the tubing; it is not “felt” by the formation perforations. 4-4 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL Figure 4-1 Tubing/annulus friction pressure distribution According to the first two principles, the indicated pump pressure is the same for both forward and reverse circulation (a sum total of 1,000 psi - 68.94bar, however, that the friction pressure exerted on the formation is considerably different). The formation is exposed to 750 psi (51.7 bar) friction pressure in reverse circulation, but only 200 psi (13.7 bar) in forward circulation, as shown in Figure 4-1. The WSS needs to be aware of this effect when choosing the circulation path. Although the pressure differential cannot be seen on the pump gauge (it reads the same in both cases), the effect is “felt” downhole. If the formation perforations are exposed, whole fluid may be pumped away or the formation fractured. 4.2.1 Barrier Concept While a workover is in progress, physical barriers are necessary to prevent kicks because the usual controls and conditions that prevent kicks during drilling are absent. Workover conditions that differ from drilling conditions include the following: • • • Formations are more permeable since they have been perforated, stimulated, or hydraulically fractured. Overbalanced conditions sustained in drilling are difficult to sustain in workover wellbores that contain open, permeable zones. Workovers do not normally use a solids-laden fluid to deposit an impermeable filter cake, so the formation is more likely to take fluid, resulting in a loss of hydrostatic column height and possibly a loss of primary well control. A barrier is defined as “any impervious material or device that can be demonstrated to temporarily or permanently prevent the flow of wellbore and reservoir fluids”. If fluid is considered to be a barrier, its hydrostatic pressure must be greater than the formation pressure and its condition and position must be capable of being monitored. Monitoring includes knowing the density of the fluid http://www.petrom.com 4-5 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 4. WELL CONTROL and the level of the fluid. The fluid level is most accurately determined by using acoustic level measuring with echometer. Barriers are divided into the following classes: • • • Primary barriers are those used during normal workover operations. They include such tools as a wireline stuffing box or a workover fluid providing hydrostatic pressure. Secondary barriers are used in support of normal operations or as a contingency (e.g. an annular preventer or back-pressure valve). Tertiary barriers are used in emergencies—e.g. a shear or blind ram or a tree master valve used to cut wireline. Required numbers of barriers depend on the estimation of operation risk level, shown in Table 4-1. The proposed classification of the wells, considering a potential risk in well during operation, is: • LOW RISK WELL - Well that cannot flow to the surface naturally • MEDIUM RISK WELL - Well capable of sustaining flow to the surface, or one with: SIWHP less than 210 bar (3000 psi) H2S less than 1% (10,000 ppm) • HIGH RISK WELL - Gas well, or one with: SIWHP greater than 210 bar (3000 psi) H2S more than 1% (10,000 ppm) See also classification for the: REGULAMENT PENTRU PREVENIREA SI COMBATEREA MANIFESTARILOR ERUPTIVE LA SONDELE IN FORAJ, REPARATII CAPITALE SI PRODUCTIE. Ed. 1982 Table 4-1 Number of barriers depend on well risk classification Type of Well based on risk criteria Low Medium High Number of barriers 1 2 2 (Quality and standards of the barriers shall be greater for high risk wells) Detailed specification of required barriers in high risky wells is shown in Table 4-2 , Table 4-3 and Table 4-4. 4-6 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 2012 4. WELL CONTROL Table 4-2 Minimum number of barriers on annulus and tubing/casing (high risk wells) Risk Classification High Risk Wells Heavy lifting over wellhead (i.e. move rig in/out) Minimum 2 independent barriers Surface barriers (separate for tubing and annulus side): •Closed Xmas tree. •Closed annular side outlet valves. Subsurface barriers (separate for tubing and annulus side): • Cemented and unperforated casing +shoe track with floats or cement plug. • Overbalanced static mud column. • Overbalanced annular mud or brine column with partial losses, both with level at surface and continuously monitored. • Inflow tested SSSV with zero leak rate and zero pressure above it. • Tubing packer in combination with zero annulus pressure. • Inflow tested downhole plug (shallow set) with zero pressure above it. • Pressure tested deep or shallow set downhole plug with brine above it. (*) (*) Deep set plug and brine column are dependent and therefore considered one barrier. Remove/Install BOP / XMAS TREE Drilling / Workover Operations Minimum 2 independent barriers Minimum 2 independent barriers Surface barriers (separate for tubing and annulus side): •Pressure tested tubing hanger seals + annular side outlet valves. •Shallow set plug pressure tested from above to maximum anticipated working pressure differential. Liquid volume pumped shall be controlled to avoid testing against deeper plug. •Shallow set and pressure tested. Retrievable Test, Treat and Stimulation (RTTS) packer (or equivalent) with storm valve. Subsurface barriers (separate for tubing and annulus side): • Cemented and unperforated casing +shoe track with floats or cement plug. • Overbalanced static mud column. • Overbalanced mud or brine column with partial losses, both with level at surface and continuously monitored. • Inflow tested SSSV. • Pressure tested or inflow tested tubing packer in combination with zero annulus pressure and brine to surface. (*) • Inflow tested bottom wireline plug. (Inflow test for 4hrs minimum). • Pressure tested deep set plug with kill brine to surface. (*) Surface barriers: • Pressure tested BOPs + Kelly cock or Gray valve + annular. (*) • Pressure tested annular side outlets, casing / liner. (*) BOP stack shall be rated to a minimum of 350 Bar Shearing rams that can shear work string shall be included. Subsurface barriers: • Over balanced mud or brine column, either static or with partial losses, which is continuously monitored and the level maintained at surface. • Confirmed and pressure tested cement plug. (*) Deep set plug or completion packer and brine column are dependent and therefore considered one barrier. http://www.petrom.com 4-7 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 4. WELL CONTROL Table 4-3 Minimum number of barriers on annulus and tubing/casing (medium risk wells) Risk Classification Medium Risk Wells Or Shallow sections of high risk wells where medium risk criteria apply Heavy lifting over wellhead (i.e. move rig in/out) Minimum 2 independent barriers Surface barriers (separate for tubing and annulus side): • Closed Xmas tree. • Closed annular side outlet valves. • Inflow tested TWCV or BPV. • Inflow tested shallow set wireline plug with pressure fully bled off above it. Subsurface barriers (separate for tubing and annulus side): • Cemented and unperforated casing +shoe track with floats or cement plug. • Overbalanced static mud column. • Overbalanced mud or brine fluid column with partial losses and continuously monitored zero surface pressure. (*) • Dynamic water column, closely monitored and continuously filled up with specified minimum water rates. (relevant to annulus side). • Pressure tested tubing packer. • Pressure tested deep or shallow set downhole plug with brine above it. (**) (*) In case a Two Way Check Valve (TWCV) or Back Pressure Valve (BPV) is installed, only confirm pressure above TWCV /BPV is zero. (**) Deep set plug and brine column are dependent and therefore considered one barrier. 4-8 Remove/Install BOP / XMAS TREE Drilling / Workover Operations Minimum 2 independent barriers Minimum 2 independent barriers Barriers shall be combination of: Barriers may be combination of one subsurface and one surface. Surface barrier: •Pressure tested tubing hanger seals + Annular side outlet valves. •Shallow set wireline plug or TWCV, pressure tested from above. Control the liquid volume pumped to avoid testing against deeper plug. •Shallow set and pressure tested RTTS packer (or equivalent) with storm valve. Subsurface barriers: •Cemented un-perforated casing + shoe track with floats or cement plug. •Over balanced static mud column. •Over balanced mud or brine column with partial losses, and continuously monitored zero surface pressure (relevant to annulus side). •Dynamic water column closely monitored, and continuously filled up with specified minimum water rates (relevant to annulus side). •Pressure tested tubing packer with brine to surface. (*) •Inflow tested bottom wireline plug. •Pressure tested deep set plug or shear out plug with kill brine to surface. (*) (*) Deep set plug or completion packer and brine column are dependent and therefore considered one barrier. http://www.petrom.com Surface barriers: • Pressure tested BOP + Kelly cock or Gray valve + annular side outlets. • Pressure tested annular side outlets, casing / liner. Subsurface barriers: • Over balanced mud or brine column, either static or partial losses, which is continuously monitored and level maintained at surface. • Dynamic water column, closely monitored, and continuously filled up with specified minimum water rates. • Confirmed and pressure tested cement plug. (*) Pressure tested at least to closed in Tubing Head Pressure (CITHP) + 10%. RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL Table 4-4 Minimum numbers of barriers on annulus and tubing /casing (low risk wells) Risk Classification Heavy lifting over wellhead (i.e. move rig in/out) Remove/Install BOP / XMAS TREE Drilling / Workover Operations Low Risk Wells Minimum 1 barrier Minimum 1 barrier 1 barrier Surface barriers (separate for tubing and annulus side): •Shallow set and pressure tested RTTS packer (or equivalent) with storm valve. •Cemented un-perforated casing +shoe track with floats or cement plug. Tubing side: •Wireline plug or TWCV pressure tested from above. •Drilling BOP or Sucker rod BOP + Kelly cock or Gray valve + annular side outlets. •Confirmed and pressure tested cement plug. Or Shallow sections of high or medium risk wells where low risk criteria apply • Closed Xmas tree. • Closed annular side outlet valves. Occasionally, gas broken out of the crude is present in the annul us of non free flowing wells. This gas shall be bullheaded back into the formation. Confirm that the pressure on the tubing and annulus is zero. Annulus side: •Pressure tested tubing hanger seals + Annular side outlets. Occasionally, gas broken out of the crude is present in the annul us of non free flowing wells. This gas shall be bullheaded back into the formation. Confirm that the pressure on the tubing and annulus is zero. Very often workover operation or well intervention will be performed in the wells having pressure at the bottom lower than hydrostatic pressure. In such situations there is no control over the fluid level because of continues losses of the workover fluid into formation. If the reservoir pressure and GOR are very low losing WO fluid is very intensive and the fluid level is close to the pump setting depth or bottom of the well. According to the OMV Petrom internal training and procedures (which are still under development), it could happen that during WO and WI there is no barrier in place. Below are listed the operations in the wells during which for a particular period of time there is no barrier: 1. Change pipe rams manually or hydraulically (single ram preventer ) 2. POOH/RIH downhole equipment for different pump types (sucker rod pumps –SRP, progressive cavity pump- PCP and electrical submersible pump-ESP with downhole drive and cable). 3. Swabbing with a closed and open system (oil, water and gas wells without H2S). 4. Procedure for pull out of hole stuck sucker rod string and pump. 5. Change dual completion in oil wells with installed pumps and water wells (until now there are now wells with dual completion and pump installed in OMV Petrom). In all of these situations special precautions and procedures has to be used to assure safe operations. Development of these procedures is ongoing process and should be completed in the near future. http://www.petrom.com 4-9 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 4. WELL CONTROL 4.3 Well Control Methods/Procedures 4.3.1 Well Shut-in The importance of containing a kick and keeping the influx volume to a minimum cannot be overemphasized. Large kicks lead to high wellbore and surface pressures and large volumes of kick fluids that must be handled on the surface. The shut-in, or containment procedures can vary, depending on the type of equipment in use and the operation in progress at the time of the kick, whether on-bottom circulating or tripping. The shut-in procedures explained below apply to a conventional workover rig. Due to the limited wellbore volumes available in a completed well or one being worked over, it is imperative that minimal time be expended in shutting in a well. Shut-in Procedure for Conventional Workover Rig (On-Bottom Circulating) Initial lineup: • • • Killed BOP valves are closed. Path is open from BOP valves to choke. Choke is closed. Use the following steps to shut in the well: 1. 2. 3. 4. 5. 6. 7. With pump(s) running, pick up work string until a tool joint is above the floor level. Shut down pump(s) and watch for flow. If the well is flowing, close the work string valve with its closing tool. This tool should be stored in a conspicuous location on the rig floor. Close annular BOP. If there is no annular BOP, use the pipe rams.* Open the choke line valves on the stack to gain access to casing pressure. Notify the WSS that the well is shut in. Monitor and record SITP, SICP, and pit gain. *If pipe rams are used, make sure the string is at a height that avoids closing the pipe ram on a tool joint or tubing connection across the stack. This height should be known in advance. Shut-in Procedure for Conventional Workover Rig (Tripping) Initial lineup: • • • • • Killed BOP valves are closed. Path is open from BOP valves to choke. Choke is closed. Work string safety valve and wrench are available on floor. Safety valve is in open position. Check the well for flow; if it is flowing, use the following steps to shut in the well: 1. 2. 3. 4-10 Position a connection for stabbing at rig floor. Install an open work string safety valve. Close valve with a wrench. Close annular BOP. If there is no annular BOP, use the pipe rams.* http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL 4. 5. 6. 7. If the work string is less than 900 m (3000 feet) long, or if there is a packer on the tubing string, space out the work string and close and lock a pipe ram.** Open the choke line valves on the stack to gain access to casing pressure. Notify the WSS that the well is shut in. Read and record SITP, SICP, and pit gain. *If pipe rams are used, make sure the string is at a height that avoids closing the pipe ram on a tool joint or tubing connection across the stack. This height should be known in advance. **Locking the pipe ram resists the force of the wellbore pressure as it attempts to eject the string from the well. Procedure for Shutting In Well If the workover operation should stop from any reason, a well has to be shut in before the stopping operation The following steps to shut in and secure the well should be followed: 1. 2. 3. 4. 5. Circulate at least one bottom-up volume of the well to check for the presence of gas in the workover fluid. This step will require running tubing to the bottom if it is not already there. If this is an open-hole completion, leave the work string inside the casing. If the well has been taking fluid, consider spotting a fluid loss pill across the suspect zone. Make up a pup joint on the top of the tubing string. Lower the string, close the pipe rams on the pup joint, and lock the pipe rams. (The pup joint collar below the rams will prevent upward movement of the tubing string in the presence of unforeseen well pressure that might build during the closing period). Install the tubing safety valve and a pressure gauge on top of the pup joint. (This gauge and valve allow you to make a safely check for pressure after the starting operation). Close the safety valve. Consider securing the tubing string with a chain and binder or other suitable device to prevent further upward movement. Procedure for Opening Well It is not uncommon for a gas bubble to enter the wellbore during shut-in period. During the long time period, a slow feed- in of gas can accumulate into a sizeable volume. When the well opens, a pressure release and the flow will be achieved. Follow these steps before reopening the well for normal workover operations: 4. Check the tubing string pressure gauge by opening its needle valve. If no pressure is registered on the gauge, check for flow past the safety valve. 5. Check the annulus pressure gauge. If no pressure is registered, check for annular flow. Normally, you should check for flow through the choke manifold. 6. If there is no pressure or flow on either the tubing or the annulus, is it safe to open the well? If there is pressure or flow, the well must be killed with the appropriate fluid and following the required procedure. http://www.petrom.com 4-11 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 4. WELL CONTROL Trapped Pressure at Shut-in When shut-in pressures are initially recorded following the initial buildup, it is important to determine whether these pressures are accurate—that is, whether they are representative of the differential between formation pressure and wellbore hydrostatic pressure. Complications such as trapped pump pressure and rapid gas migration can affect their accuracy. The following procedures can be used to detect the presence of trapped pressure and to remedy the situation if any is found. Perform this trapped pressure check only after surface pressures have been stabilized (after an initial period of rapid buildup). Procedure for Checking for Trapped Pressure Use the following procedure with the graphs in Figure 4-2. Bleed a small amount of fluid through the choke 40 to 75 lit (1/4 to 1/2 bbl). Surface pressures will initially decrease, build, and then stabilize. Observe shut in tubing pressure (SITP). If the SITP is stabilized at a value less than the previously observed stable pressure and trapped pressure was detected and at least partially bled off, continue with the procedure. Bleed another small amount of fluid through the choke and once again observe the stabilized SITP. Accurate SITP is verified when consecutive and identical values appear on the tubing gauge. In a workover, the SITP will often bleed to zero pressure. Figure 4-2 and Figure 4-3 provide graphic representations of the bleeding process and accompanying SITP and SICP readings. Figure 4-2 Pressure profile during bleeding with mechanically induced kick Figure 4-2 shows the bleeding process when the crew handles a mechanically induced kick (i.e., a kick induced by not keeping the hole full during trips, swabbing, etc.). It is common that in many workovers and completions, when the SITP bleeds to zero pressure, the density of the fluid in the hole is sufficient to balance formation pressure. 4-12 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL Figure 4-3 Pressure profile during bleeding with light fluid in the hole In Figure 4-3 the SITP did not bleed to 0 psi, presenting clear evidence that the fluid in the hole is lighter than required. Although rare, this can occur when light fluid is pumped into the well, creating a reduction in overall hydrostatic pressure and causing a kick. Procedure for Obtaining the SITP with a Back Pressure Valve in the String It is quite common that the SITP cannot be read due to the presence of a Back-Pressure Valve (BPV) or check valve in the work string, as a common practice in workovers. Nevertheless, an accurate reading is required to calculate the kill fluid density, ICP (Initial Calculating Pressure), etc. The following procedure should be used to open the pump valve and determine the SITP: 1. Line up the manifold to pump into the tubing and monitor the gauge. 2. Slowly pump into the tubing (e.g., at a rate of 1/4 to 1/2 bpm); the pressure will increase. When the BPV first opens, the pressure will stop rising momentarily (the gauge needle “stutters” or hesitates). 3. Record the exact SITP pressure reading when the gauge needle hesitates. To continue pumping at this point will further increase the pressure and would be of no use. If there is a computer logging service on location, request a plot of pump pressure versus strokes. It is easy to see the pressure stabilization point on a graph (it looks very similar to the breakover point in the leak-off test done in drilling). 4.3.2 Well Killing The choice of well kill procedure will depend on a number of factors including tubing and casing integrity, ability to circulate the annulus fluid, formation pressure and the well completion method. When it is required to kill a well during workover operation, the easiest, the quickest and the most certain method is by a circulation. This requires that there are some means of establishing communication as close to the producing zone as possible. This might be by opening a Sliding Side http://www.petrom.com 4-13 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 4. WELL CONTROL Door (SSD) just above the packer (or punching a hole in the tubing, or pulling a dummy from a Side Pocket Mandrel (SPM) in a completion or by using a string of pipe that has been run to a suitable (deep) depth using Coiled Tubing or Snubbing. In this case, the method of killing the well is to circulate (forward or reverse) a kill weight fluid around the wellbore whilst maintaining a constant Bottom Hole Pressure (BHP) at all times sufficient to give a slight overbalance against the formation pressure. This is achieved by opening or closing a surface choke, and by following a pre-calculated kill sheet which gives the required tubing surface pressure at all times during the kill. The principles for working out the kill sheet are the same whether it is forward or reverse circulation. Various factors must be taken into account when calculating a kill sheet (or graph). • • • • Is the tubing used the same ID/OD for the whole length? Weight of fluid currently in tubing and annulus and weight of kill fluid? Current shut in WHP and annulus pressure? Contents of wellbore, oil or gas? Well killing methods used in OMV Petrom are: • • • • • Bullheading Direct Circulation Reverse Circulation Intermittent Bullheading Using Lubricator Facility Typical kill workover fluids might include: • • • Brine Completion fluid Drilling mud (oil or water based). It is very important that the kill workover fluid is compatible with the formation and the formation fluids. Incompatible fluids can cause swelling of clays and chalks, scale deposition and other problems that can permanently block the perforations or greatly reduce productivity. Because of that OMV Petrom procedure for selecting the best workover fluid is based on the following principles: • • • • • 4-14 Workover fluid must fit producing fluids (oil, gas and water) and used production/lift methods (flowing and AL). Should be compatible with reservoir fluid and rock in order to avoid potential damage during workover operation (induced damage which will cause additional costs) Impact of reservoir/wellbore pressure and temperature on WO fluid density and its changes during operation and execution of job. WO fluid should be in accordance with HSE regulation considering the potential impact of the presence of sour gases like H2S, CO2. Environmental protection is followed in accordance with government law regulations. http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL Wait-and-Weight Method This method is most frequently used during drilling operation, but can be used to control well in workover well control. The name of the method is indicative of what happens—it should wait until the fluid is weighted up to the correct density and then kill the well. Whether the fluid density should be increased is determined by the stable SITP reading. If the SITP does not bleed to 0 bar, then the fluid density is insufficient and must be weighted up. The density can become insufficient for the following reasons: • • • Mismanagement of the fluid on the surface, resulting in light fluid being pumped downhole. Formation fluid contamination of the fluid in the tubing. Penetration of a zone of higher formation pressure, as when sidetracking or washing through sand plugs. The wait-and-weight method is a one-circulation kill procedure. Kill fluid is pumped in while the influx is circulated out. If it is performed properly, it will require the least amount of “on choke” time. A drawback to this method is the time required to weight up and condition the fluid before the pumping begins. In the event of a gas influx, the time required to condition and weight up may allow gas migration to take place, requiring surface pressure monitoring and controlled bleeding of fluid until the actual well killing operation can begin. Additionally, the Well Site Supervisor (WSS) must generate a circulating “pressure schedule” and use it to monitor the tubing pressure while displacing the tubing string. Tubing pressure will gradually decrease as the tubing string is displaced to kill fluid—that is, filled with kill weight fluid. This decrease in tubing pressure is the result of kill fluid hydrostatic pressure replacing the original underbalance shown on the tubing gauge. Forward circulation In a forward circulation, kill fluid is pumped down the tubing, through a circulating device (or out the end of a workstring/coiled tubing) and up the annulus. Forward circulation has several disadvantages over reverse circulation and is not recommended because: • • • • • It involves higher circulation pressures Disposal of formation fluids through the side outlet valves is difficult. It is more difficult to pump the oil/gas ahead of the kill fluid. The fluid in the wellbore will probably mix with fluid in the annulus making choke operation more difficult. The casing will be exposed to corrosive wellbore fluids. Under normal circumstances, a forward circulation kill would probably only be undertaken with a Coiled Tubing or Snubbing string in the hole. The graph below (Figure 4-4) represents the typical pressure at the top of the Coiled Tubing or Snubbing string (tubing pressure) and at the top of the pipe/completion annulus (annulus pressure). These graphs are rather simplistic and assume various things; http://www.petrom.com 4-15 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 4. WELL CONTROL • • • • • The sizes of the workstring and completion do not vary from top to bottom. The workstring is already full of the kill weight fluid. The well is not approaching horizontal. The well contains oil and gas. There is no gas invasion of the kill fluid as it comes up the annulus. Figure 4-4 Forward circulation tubing pressure Reverse circulation The reverse circulation is the simplest and the safest kill method. It uses the natural ’U´ tube effect of the different gravities of fluids in the tubing and annulus to flow the well fluids up through the tubing and out through the Xmas tree choke. The only pumping required is during equalization across the circulation device before it is opened and when the kill fluid is in near balance with the other fluids in the tubing. In a reverse circulation kill, the well is circulated holding a back pressure on the formation so that a constant bottom hole pressure can be maintained to eliminate any further flow of reservoir fluid. This procedure is even more effective if a plug can be set to isolate completion fluids and kill fluids from the formation. As kill fluid enters the completion, there is a probability that gas will be encouraged to enter the kill fluid as it is being pumped up the completion. This can be minimized by adding viscosifiers to the kill fluid to inhibit the entrapment of gas. This is normally the preferred method of killing a well when communication can be established at a suitable depth between the tubing and annulus. It has the great advantage of filling the tubing and annulus with kill fluid in one operation and all wells can be killed using this method. When calculating the kill graph for a reverse circulation method, it must be remembered that the completion annulus already has a full column of fluid. This fluid may or may not be at a higher density than the kill fluid, as shown in Figure 4-5, Figure 4-6, Figure 4-7 and Figure 4-8. 4-16 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL The following graphs represent typical annulus and completion surface pressures during a reverse circulation kill. They assume: • • • constant completion geometry, no gas invasion, deviation is not approaching the horizontal. The following graphs also assume that the annular volume is greater than the tubing volume and that the new kill fluid is lighter than the existing completion fluid. This might happen in an old well where the original, kill weight, completion fluid is now too heavy for the depleted reservoir. The graphs have been drawn with the zero psi lines above the axis to allow them to be seen. Figure 4-5 Reverse circulation kill graph Figure 4-6 Reverse circulation tubing pressure – kill fluid is heavier than completion fluid http://www.petrom.com 4-17 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 4. WELL CONTROL Figure 4-7 Reverse circulation annulus pressure – kill fluid is heavier than completion fluid Figure 4-8 Reverse circulation – kill fluid is approximately equal to completion fluid Lubricate and Bleed This method is recommended in wells where the other methods are not possible. The technique consists of pumping a small volume of very dense fluid down the string until the maximum allowable surface pressure is reached. Operations are stopped for a period of time to permit the dense fluid to fall. The well is then opened and the production fluids and/or gas are bled off until some of the dense fluid is recovered. The process is repeated until the entire tubing volume is displaced with the dense fluid and the well is dead. 4-18 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL 4.3.3 Non Circulating methods (bullheading, constant tubing pressure method…) Bullheading Bullheading (or squeeze killing) involves pumping kill weight fluid down the tubing and forcing the wellbore fluids back into the formation through the perforations. This method is only possible if the well conditions are such that pumping back into the formation is possible. If the tubing or perforations are blocked then this method cannot be used. The pumping rate during bullheading must be high enough to stop any gas migrating back up through the kill fluid and to keep the fluid from free falling down the tubing and mixing with the wellbore fluids. Ideally, a workover fluid should be forced down the tubing, pushing everything in front of it. The pump rate (and pressure) must not exceed formation fracture pressure. Fracturing the formation can cause severe losses that are very difficult to stop even with coarse Lost Circulation Material (LCM). Pressure ratings of surface equipment must also be considered. Most producing wells in OMV Petrom have low formation pressures and a full column of kill fluid may give rise to excessive bottom-hole pressures which may cause a fluid to be lost into the formation. In this case, solids such as sized salt particles or Calcium Carbonate etc. may be required to temporarily block off the perforations to enable them to support the full column of kill fluid. In low permeability wells it might be difficult to pump fluids into the formation. This can result in very high surface pressures for low pump rates. Small tubing strings may also cause pressure problems because of high friction losses in the tubing. If the tubing is very large, pressure will probably not be a problem although it may be difficult to maintain the clear interface between the kill fluids and the wellbore fluids. This can cause the kill to take much longer with much more fluid lost to the formation. The main disadvantage of bullheading is that everything that is in the wellbore, including scale, debris, sand, etc., is likely to be forced back into the formation. There is even the risk of plugging the perforations before the kill is achieved. Surface and downhole pressures will be the highest with bullheading. The bullheading kill sheet template used as best practice in OMV Petrom is shown in Figure 4-9. Procedures for Controlling Gas Migration The two modes of gas behavior in the wellbore exist: gas expansion, where gas is free to expand normally (as it does in constant bottomhole pressure kill procedures), and gas migration, where gas migrates up a shut-in or blocked wellbore and does not or cannot expand. There are two recognized methods of dealing with migration, or “allowing expansion”: the constant tubing pressure method and the volumetric method. These methods are used to control gas migration when it is not possible to circulate or bullhead the well. They can be used temporarily while operations are ongoing to get in a position where the well can be circulated or bullheaded. http://www.petrom.com 4-19 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL Figure 4-9 Bullheading Kill sheet template Constant Tubing Pressure Method 4-20 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 2012 4. WELL CONTROL The constant tubing is based on the following assumptions: 1. There is communication between the tubing and the choke located on the annulus. 2. The tubing pressure can be read. This procedure can be used to control gas migration while mixing the kill fluid or making other preparations for a circulating kill procedure. Procedure for Constant Tubing Pressure Bleed Method: 1. Allow SITP to increase by a safety margin of 3.5 – 7 bars (50-100 psi), which prevents further influx due to over bleeding with choke. This is called the lower limit. 2. Allow SITP to increase additional 3.5 – 7 bars. This is the upper limit. 3. Using the choke, bleed the annulus until the tubing pressure drops down to the lower limit. The time lag should be marked. 4. Repeat steps 2 and 3, keeping the tubing pressure between the lower and upper limits as long as desired or until another procedure is implemented. Important Note: There is a time lag between opening the choke and seeing the pressure drop on the tubing gauge. The recommended procedure is to open the choke until the desired drop is seen on the casing gauge, then close the choke and wait until the change appears on the tubing gauge. In the long term, the casing gauge reading will not stay constant the way the tubing gauge does (the WSS should not use the choke to make it so!). With successive bleed cycles, the gas is continually expanding as it rises up the annulus. Volumetric Method This procedure accomplishes the same objective as the constant tubing pressure method in allowing gas expansion, but it uses a different process control. This method is used when there is no tubing communication. Since tubing pressure cannot be read, the process must be controlled with the casing pressure and the volume of fluid bleed from the annulus. There must be a calibrated tank on the rig located downstream of the choke capable of reading of small volume increments - 80 lit (1/2 bbl). Procedure for Volumetric Method 1. Select a safety margin and a range. Recommended margin: 7 bars (100 psi). 2. Calculate Hydrostatic Pressure (HP) per fluid volume in the upper annulus (bar/m3). HP (bar/m3) = Fluid Gradient (bar/m)/Annular Capacity Factor (m3/m) 3. Calculate Volume to Bleed each cycle. Volume to bleed (m3/cycle) = Range (bar)/HP(bar/m3) 4. 5. 6. 7. Construct casing pressure vs. volume to bleed schedule. Allow SICP to increase by margin without bleeding. Allow SICP to increase by range without bleeding. Maintaining SICP, bleed small volumes of fluid into tank until calculated volume in step 3 is bled. Repeat steps 6 and 7 until gas is at surface or another procedure implemented. http://www.petrom.com 4-21 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 4. WELL CONTROL During the procedure, it is critical to hold SICP constant while bleeding fluid. The bleeding is done on the flat part of the pressure graph—that is, the SICP is not to increase or decrease. The choke should not be opened more to speed up the bleeding process (which lowers SICP below the line) or another kick will result. Patience is required: the bleed for the first volume may take several hours (depending on well depth and type of wellbore fluid). The question often arises, “How long should this procedure be carried on?” Remember that the goal is to control gas migration and allow expansion. If the gas influx reaches the top of the well during the volumetric schedule, the procedure is over: gas migration has been controlled. (This is evidenced by the sound of gas flowing across the choke and a stable SICP when the well is closed in.) Do not open the choke at this point and bleed gas off the well. This will reduce bottomhole pressure and most likely result in additional influx. It will then be necessary to create yet another pressure schedule and repeat this rather time consuming procedure. Removing gas from the top of a well (at constant BHP) requires lubricate-and-bleed procedures. Volumetric kill sheet template is shown in Figure 4-10. Figure 4-10 Kill Fluid Volume Calculation sheet 4-22 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 4. WELL CONTROL In Figure 4-11 is shown workflow for selection the well killing method depending on downhole and surface pressure and fluid inflow conditions. WELBORE PRESSURE CONTROL Pressure equilibrium in the wellbore and arround it Ppores≤ Pwellbore ≤ Pfrac Kick indicators Ppores > Pwellbore Lost of circulation Pwellbore>Pfrack Control the kick Not controllable kicks Prevent the kick Controllable kicks Control Influx without flowing it out of wellbore Control influx out of wellbore Force fluid back to formation Control influx at surface Without circulation With circulation Volumetric method By pumping weighted fluid while circulating (simultaneous method) Bull heading method By pumping weighted fluid in several stages By pumping weighted fluid in one stage (wait and weight method) By pumping non-weighted fluid (driller’s method) Lubrication method Figure 4-11 Technology Workflow for Selection Well Killing Method http://www.petrom.com 4-23 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 4. WELL CONTROL International kill sheet step by step procedure in Figure 4-12 is accepted and used in OMV Petrom as best practice. Figure 4-12 Surface BOP vertical well kill sheet 4-24 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL Figure 4-13 Surface BOP vertical well kill sheet (continuation) http://www.petrom.com 4-25 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 4. WELL CONTROL 4.3.4 Well Control Indications of Kicks Understanding the causes and warning indications of kicks can help the WSS and crew prevent them from occurring or, if they do occur, at least minimize their effect. Most kicks can be eliminated safely and effectively if the WSS and crew monitor operations carefully and understand the necessary actions that should be taken in the event of a kick. The best option, however, is preventing kicks. Knowing what causes an influx of undesired well fluids into the wellbore is the first step in preventing kicks. Known causes of kicks include: • • • • • • • Insufficient fluid density or weight- primary well control is lost Swabbing Surging Failure to fill well when pulling tubing Failure to monitor and maintain correct hole fill volume during tripping Failure to circulate after shut-in periods Loss of fluid downhole The crew must watch for various warning signs that a kick is occurring or conditions are favorable for a kick. These indicators are described below, along with recommended actions to be taken when they are observed. Warning signs include: • • • • • • • • • Incorrect hole fill volume when pulling tubing or work string. Incorrect displacement volume when running tubing or work string. Increase in well flow during circulation. Pit gain. Shows of oil or gas at the surface. Cut fluid weight. Drilling, milling, or washing breaks. Increase in weight indicator reading. Well flow with pumps off. 4.4 Downhole Equipment 4.4.1 Special Equipment for Well Control Subsurface Safety Valves These valves shut off well flow through the tubing bore. Tubing-retrievable safety valves are integral to the tubing string and can be retrieved only by removing the entire string. Wireline-retrievable safety valves are located in landing nipples and are installed and removed with wireline tools. These valves are further classified by the way they are controlled: Surface-Controlled Subsurface Safety Valves (SCSSSV) These safety valves have a connection for a hydraulic control line that runs back to the surface. A control panel on the surface is used to close the valve, either by manual intervention or with an automatic system that actuates in an emergency such as fire or uncontrolled well flow downstream 4-26 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL of the valve. The valves are also designed to self-close if hydraulic control pressure is lost. They are mandatory in many producing areas, particularly offshore. SCSSSVs are set at the shallowest possible depth so that if the hydraulic control line is damaged, the hydrostatic pressure of the annular fluid will not open the valve. They are also set at shallow depths to facilitate retrieval and repair. Subsurface-Controlled Subsurface Safety Valves (SSCSSV) This type of safety valve is controlled by well conditions. When downhole pressure or flow velocity reaches a preset value of differential pressure, the valve will close automatically. The valve is actuated by the pressure differential across the valve that is created by increased fluid velocity, which occurs when the integrity of the production string above the safety valve is broken. These valves are also called storm chokes. 4.5 Surface Equipment 4.5.1 Wellhead and Christmas Tree A wellhead is customarily divided into three sections for descriptive purposes. The first section consists of the lower wellhead section, which is connected to the outermost cemented casing string with a threaded or slip-on weld connection. This section supports the weight of the BOPs while drilling and the weight of the rest of the wellhead during production by transferring the load to the cemented surface casing. A tapered bowl to accept the hanger and primary seal for the next casing string to be installed is also included in the first section. This may be the intermediate casing or the production casing. The first section normally has one or two casing outlets to allow communication with the surface casing annulus for pressure monitoring, for the injection of inhibitors, or for killing or cementing in the event of dangerous pressure conditions. An example of a dangerous pressure situation would be a ruptured casing string caused by inadvertently applying bullheading kill pressure to the casing via a hole or breach in the tubing string. The casing valves provide a conduit through which kill fluid can be introduced into the annular space and gas bled off. The second section, which is flanged to the top of the first one, includes a secondary seal at the top of the production string. The secondary seal is used as a backup in case the primary seal of the first section fails. The second section includes a tapered bowl that holds the tubing hanger and the primary seal for the tubing. Two outlets are provided in this section body. On at least one of them, a valve and a pressure gauge is installed for monitoring pressure in the tubing/casing annulus. The third section is flanged to the top of the second one. It includes the tubing head, which terminates the tubing string, and the familiar assembly of valves called the Christmas tree. At the bottom of the tree are one or more master valves (in a multiple-string completion, there will be a master valve for each string). The master valve is the main surface-control point for access to the tubulars. It is always fully open when the well is producing or when a workover is in progress. Usually, for safety reasons, the Xmass tree has two master valves. One to be operated when needed and the second held as backup. The working pressure of the master valve is sufficient to handle full wellhead pressure, and it can be used to close the well in and allow work on a tree valve or a fitting above it without killing the well. Above the master valve is a flow fitting, which may be a tee or a cross. The wing valve and a choke will be attached to one or both sides of the flow fitting and http://www.petrom.com 4-27 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 4. WELL CONTROL production flows through the fitting. On top of the flow fitting there is often a crown valve or swab valve fitted with an adapter for attaching a lubricator for wireline/slick line works. A lubricator is a pressure-rated tube that allows a tool string to be lowered into the well while the well is flowing or under pressure. One end of the lubricator is attached to the swab valve with a flanged connection; the other end contains a seal assembly (called - stuffing box) that seals against the wireline or slick line used to run the tool string down hole. 4.5.2 Blowout Preventers (types, selection) BOP Equipment BOP equipment, which is used to control the well in the event of a kick, includes the following: • • • • • • Annular preventers, Ram preventers , String safety valves, Chokes, BOP control systems, Back-pressure valves. Annular Preventers The annular preventer, when closed, seals the annular space between the pipe or tubing and the wellbore. Circular, one-piece resilient sealing elements of various designs are used to make the seal. Annular preventers are often called “annular BOPs” or simply “annular.” The design of the annular preventer allows it to accomplish the following: • • • • Close around the complete circumference of a variety of tubing sizes Seal against irregularly shaped completion components Seal around the tubing that is being stripped in under pressure Close on open-hole in emergencies Ram Preventers Ram preventers also called “ram BOPs” or simply “rams”—use two opposing pistons (or manual screws) to move two opposing ram blocks into the wellbore. Depending on the geometry and seal arrangement of the ram blocks, the rams can be used for the following purposes: • • • • • • • • 4-28 Seal around a pipe or tubing of a particular size (pipe rams). Seal around two tubing strings simultaneously (dual or offset rams). Seal around wireline. Seal around sucker rods (production rams). Cut tubing or pipe (shear rams). Cut tubing or pipe and then seal the wellbore above the cut (blind/shear rams). Seal an open wellbore (blind rams). Seal around pipe or tubing in a range of sizes (variable-bore rams). http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL Rams may hold a small amount of pressure from above, but they are primarily designed to hold pressure from below. Rams are shorter in profile than annular preventers, and for this reason, they may be the only type of preventers installed on a well due to headroom restrictions from the rig substructure. In general, rams close more quickly than annular and require less hydraulic fluid. They should not be closed on pipe tool joints or tubing upset areas; otherwise seal damage will result. Most rams used in workovers have a provision for manually locking them in the closed position, which is desirable during well control operations or when shutting in for the night. Typical Ram preventer is shown in Figure 4-14 Figure 4-14 Typical Ram preventer Inside Blowout Preventers (IBOPs) IBOPs are spring-loaded one-way check valves that seal the bore of the tubing or work string. An internal plunger seals upward against a seat when pressurized from the wellbore while allowing pumping through the valve in the opposite direction. http://www.petrom.com 4-29 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 4. WELL CONTROL Table 4-5 Types of BOPs used in OMV Petrom Name UZ 03 Type of BOP Annular Description/Features Designed to operate with drilling or WO fluids based on water or oil, with maximum fluid temperature of 100°C. At lower side of the body, the preventer is provided with a flange end, according to API 6A. At the top the preventer is provided with studded flange. Packer is actuated by double acting hydraulic cylinders. The BOP design ensures the “self-packing” effect, that means the well pressure helps to the ram sealing; After them shutting, the sealing is maintaining even if the hydraulic fluid pressure is lost. Consists of a cast steel body, in which are mounted two sealing systems. The body is provided with sealing rams local entering. The bottom dwelling has two ferries travel guides, and at the top sealing element. B2 Ram The rams are made of metal coated with rubber, fastened the rockers, which can be removed by means of two threaded rods with left and right. Lower rams are always design for total closure. Preventer has two caps of cast steel, threaded rods through which to handle ferries. Outlet sealing rods are made by glands with gaskets. Threaded rods of each ram system are coupled with roller chains. One of the rods is extended by a coupling shaft axis and the wheel handle to handle, which serves for remote opening and closing of rams systems. When closing the rams rubber material deforms and seals on the body of tubular. Blind Pipe ram 4-30 http://www.petrom.com 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL Name Type of BOP SE Ram SHE Ram DF Ram Description/Features The preventers are single ram type, manual operated and manual bonnet opening for ram assembly. Using two SE type production blowout preventers, mounted back-to-back, ensure both the complete shut-off of the well bore and closing on a size of pipes. Designed to operate with WO and drilling fluids based on water or oil, with maximum fluid temperature of 100°C. Top and bottom with connection flanges ends according to API 6A, as well as studded flange or threaded outlet. The ram assemblies are actuated with the help of the hand-wheel. The assembly ram design assure the “self-packing” effect, which means the well pressure helps to the ram assembly sealing. Also, it is assured an extrusion of the rubber gasket towards the seal surfaces. Stem sealing test is performed using a limber hole on the bonnet. Supplementary stem sealing by soft packing injection, if is necessary. SHE blow-out preventer 7.1/16 x 700, for tubing is hydraulically operated BOP. The rams can be manually blocked in closed position by means of hand-wheel. Quick access to that rams, in order to replace them is by shifting hydraulically the front caps . The preventer handling allows limited operational pressures of tubing string. The DF blowout preventer are consisted of body and front covers of cast alloy steel and are designed to operate with WO fluids based on water or oil with maximum fluid temperature 100°C. DF BOP is equipped with a flanged side outlet, under the lower rams, to which the fluid drain joint is assembled. The rams are actuated by hydraulic cilinders with double- operation-sense pistons to close or open BOP. The access to rams, to repair or replace them, is performed through the acces windows, provided on the front faces of the blowout preventer body http://www.petrom.com 4-31 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL Name UZD 02 4-32 Type of BOP Ram Description/Features The UZD 02 Ram BOP’s are double ram type, hydraulic acting, with hydraulic covers open, for ram assemblies replacing. Alloy steel body. Designed to operate with WO and drilling fluids based on water or oil, with maximum fluid temperature of 100°C. Top and bottom with studded flange ends according to API 6A. Two studded flange outlets according to API 6A (under the every ram assembly) Rams are designed either to seal off on drill pipes, tubing or casings or to complete shut-off. The ram assemblies are actuated by double acting hydraulic cylinders. The ram assembly design ensures the “self-packing” effect, that means the well pressure helps to the ram assembly sealing; after them shutting, the sealing is maintaining even if the hydraulic fluid pressure is lost. Centering guides push the drill pipes, tubing or casings to a central position by special machining practice in the ram assembly body. Hydraulic open/close of the covers, for quickly replacement of the ram assemblies. Well pressure is isolated beside hydraulic fluid pressure using two sealing systems: one for well pressure and one for hydraulic fluid pressure. Hydraulic acting allows to quickly open and close the ram assembly. The ram assemblies are locked manually in shut off position; when the well pressure is smaller then maxim Ram BOP’s pressure (about 10% from maximum pressure), it could make the ram assy shutting. http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 2012 4. WELL CONTROL Name PITB Type of BOP IBOP Description/Features Use for WO operation if the maximum operating temperature is less than 250 ° F (121 ° C). The preventer has on bottom side a pin threaded connection which can be scrwed in to the box connection of the tubulars. The closing element is a valve type with duble sealing sistem, rubber oring /metal for low pressure and metal to metal for high pressure. The preventer is provided with a helical compression spring which supports the weight of the valve and on the same time ensure minimum contact pressure, low pressure seal requirement. Constructive solution of the preventer allows the well pressure to help in sealing process. Table 4-6 Summary of BOP application in OMV Petrom Working Pressure (bar/psi) Nominal Size 2-7/8 in 3-1/2 210/3000 IPTB 350/5000 IPTB 700/10000 1050/15000 7-1/16 in 9 in 11 in 13-5/8 in B2 DF UZD 02 SE DF UZD 02 UZ 03 SE SHE DF UZD 02 UZ 03 DF B2 DF DF UZD 02 UZ 03 DF UZD 02 UZ 03 DF UZD 02 UZ 03 B2 UZD 02 UZ 03 UZD 02 UZ 03 DF UZD 02 DF UZD 02 UZD 02 http://www.petrom.com DF 4-33 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 4. WELL CONTROL String Safety Valves These valves are used to close off the bore of the tubing or work string in the event of flow. They are available in various designs and configurations. Full-Opening Safety Valves Full-opening safety valves generally have an internal ball that is rotated into position manually with a wrench. When open, they have an unrestricted through bore that allows full-bore access and avoids erosion caused by high-velocity fluid. Full-opening safety valves can be made up and included in the string, or they can be used as stab-in valves installed by the crew on top of the tubing string when the well flows through the string. Because of the unrestricted bore, the crew has a fairly good chance of installing this type of valve when fluid is flowing through the tubing. A stab-in valve with the proper end connection to the string in use must be available on the rig floor. The closing wrench must also be available. Drop-in Check Valve Another type of IBOP is the drop-in check valve, or “dart”. The dart is placed into the string by the rig crew and allowed to fall (or be pumped) through the string, landing and sealing in a special seating nipple installed in the work string. This particular IBOP can be retrieved with wireline methods. Wireline/ Slickline -Set Tubing Plugs These valves serve the same purpose as IBOPs, but they are installed with a wireline/slickline in one of the landing nipples in the tubing string. If there are no nipples in the completion, these plugs can be set with a device called a collar stop, which holds them in position against the inside of the tubing or with DPU (Downhole Power Unit) a electro- mechanical device that is designate to produce a linear force for setting (or pulling ) wellbore tools such bridge plugs or packers actuated by batteries or wireline electrical signal . Many of these plugs use an internal mandrel, or prong, that is shifted or pulled by wireline/slickline to uncover internal ports that equalize pressures across the plug before it is released. Caution should be taken after equalizing and unseating these plugs. Any gas present under the plug behaves like a secondary kick and can cause well flow. There are many manufacturers of these plugs. Chokes Chokes are used to control back pressure in the well during well control operations. They are available in both manual (hand-adjustable) and hydraulic remote control types in various pressure ratings. Manual chokes typically have a tapered stem and a beveled seat that together form an orifice for controlling fluid flow and pressure. Fluid is allowed to flow through the orifice while the amount of back pressure is controlled by turning the hand wheel to adjust the amount of stem that is forced into the seat. The stem and seat are normally made of tungsten carbide, which resists the abrasive effect of the fluids flowing past them under turbulent flow conditions. Hydraulically operated remote chokes are normally located in the choke and kill manifold, but they are operated from a remote control panel on the rig floor. This enables the choke operator to better 4-34 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL communicate with the driller during the kill procedure. Remotely operated choke systems have additional features not found on manual chokes: • • • • Variable-speed control of choke Both casing and tubing pressure gauges on panel Pump stroke counters on panel Hand-pump operation in emergency Production chokes are normally attached to the Christmas tree’s wing valve. They serve a purpose similar to their drilling and workover counterparts in that they restrict flow. Production flow can be restricted when the production string has a volume limitation or there is an excessive amount of abrasive solids. Production chokes are of two types: positive and adjustable. Positive chokes use an insert of a desired size to achieve the restriction. Several styles of adjustable production chokes use mechanisms such as dart and seat, needle and seat, and gate and seat to achieve restriction. BOP Control Systems BOP control systems consist of hydraulic control units, accumulators, and remote panels. Hydraulic Control Units The unit’s main components are as follows: • • • • • • • • • • • • • Hydraulic pumps that supply energy to charge accumulators. Backup pumps, called air pumps, in case of main pump failure. Nitrogen backup systems are also used in some cases as a backup pressure source for the accumulator. A regulator to reduce accumulator pressure to the level of manifold pressure. Manifold pressure operates ram preventers and BOP side outlet valves. A regulator to reduce accumulator pressure to the level required to operate the annular preventers. A hydraulic control manifold that contains the regulated manifold pressure. Four-way control valves on the hydraulic control manifold. These valves route manifold pressure to the appropriate ram preventer or high closing ratio (HCR) valve. A four-way control valve that routes regulated annular pressure to the annular preventer. A bypass valve used to route unregulated accumulator pressure straight to the BOP components when required (e.g., when using shear rams). Connections to accumulators, pumps, motors, and remote panels. Relief valves for pumps. A reservoir for BOP control fluid. Gauges for accumulator, air, manifold, and annular pressure. A flowmeter to indicate fluid volume used to operate preventers and to charge accumulators. http://www.petrom.com 4-35 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 4. WELL CONTROL Control unit CH 6U-3M: Generals The BOP control system “CH 6U – 3000” (Figure 4-15), is intended for use in blowout prevent equipments hydraulic actuating and represents an assembly of hydraulic equipments (devices) designed to store and deliver hydraulic energy at high pressure. The fluid with lined out pressure is directed to the annular and ram blowout preventer hydraulic actuators. The fluid could be also used for the hydraulic actuated valve from the chokes and kill manifolds. Generally, this kind of equipments are equipped with electric driving triplex pumps, and hydropneumatic pumps (pneumatic actuated). The remote control system of the hydraulic distribuitor is pneumatic type. The main parts of a BOP Control System are: • • • Hydraulic control system CH6U-3000 (CH), Control panel (PC), Pipes rack (CH -blowout preventers and CH - PC) Installation. Figure 4-15 Control unite CH-U 3000 Accumulators Accumulators are bottle-shaped steel cylinders that are often mounted on the same skid as the BOP closing unit. Offshore they can be installed elsewhere on the rig and connected to the closing unit. Accumulators store energy in the form of pressurized BOP control fluid, which is used to open and close BOPs and valves when required. The closing unit pumps BOP control fluid in the bottles, which contain a nitrogen gas precharge. This action compresses the gas, increases its pressure, and traps energy in the control fluid to be used later. The volume of control fluid inside the bottles between the maximum system pressure and a pressure 200 psi above the precharge is called the “useable” volume. 4-36 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL With the charging pump off, there is a sufficient fluid volume to accomplish the following (with accumulator pressure at least 200 psi (14 bar) above precharge remaining): 1. 2. 3. 4. 5. 6. 7. 8. Close annular. Close rams (except blind rams). Open all HCRs. Reopen annular. Reopen rams. Close all HCRs. Close annular. Open HCR for choke line. Control Panels Control panels allow the BOPs to be operated away from the closing unit itself. It can be located on the rig floor. The similar panels on land rigs are often placed at a safe distance from the rig floor. On offshore locations, additional remote panels are sometimes placed in the toolpusher’s office. Remote panels have a master control that must be activated and held in position while operating the BOPs. Back-Pressure Valves (BPVs) and Two-Way Check Valves A back-pressure valve is a check valve that can be installed in the tubing hanger to prevent flow up the tubing while removing the tree and installing the BOPs prior to the workover. It is also installed prior to removing the BOPs and reinstalling the tree after the workover. The design of the valve allows pumping through the valve from the top while holding pressure from below. Another device, a two-way check valve, seals pressure from above or below. A BPV is replaced with the two-way check valve in order to test the BOPs. The design of the two-way check valve allows for bleeding of any trapped pressure from below the valve. A long rod called a dry rod is used to install and remove either the BPVs or the two-way check valves. The dry rod has right-handed threads on one end to engage valve threads on valves with a similar ID. The OD threads on the valves are left-handed. Consequently, when removing the valves, the rod is turned to the right until it bottoms out (this action also unseats the check inside the valve and releases any trapped pressure below the valve). Continued turning to the right backs the left-handed OD threads on the BPV out of the tubing hanger. Because pressure may be released during this operation, a lubricator should be used. Injuries and fatalities have occurred when lubricators were not used. Only trained personnel are allowed to install and remove these valves Equipment Specifications Details used in OMV Petrom SA can be find in Technical Book Intervention and Workover ( CARNET TECHNIC: Interventil si reparatii capital sonde ) http://www.petrom.com 4-37 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 4. WELL CONTROL 4.6 Workover Control Fluids Many workover operations, such as running the reservoir or upper completion, perforating, gravel packing and stimulation, require a clean, clear fluid. This fluid has to have sufficient density to exceed reservoir pressure (i.e. a kill weight fluid) in order to prevent an influx. A kill weight fluid is not a barrier in its own right; it requires mechanical isolation from the reservoir in order to prevent losses. Isolation can be achieved through a filter cake but this still does not constitute a barrier because disrupting this filter cake will lead to a loss of the overbalanced fluid. 4.6.1 Types of workover fluids used in Petrom OMV A completion fluid is used at the time a well is completed or recompleted. It provides primary well control during the completion process and is designed to minimize damage to the producing interval of the reservoir. A packer fluid is placed in the wellbore above a packer in the annular space between the production tubing and the casing. Packer fluids provide hydrostatic pressure to resist the well pressure force from below the packer, helping to hold the packer in place. Additional functions of packer fluids are: • Offset the effect of the internal tubing pressure when the well is on production • Provide a noncorrosive environment for the casing and tubing. • Provide internal support for the production casing. Workover fluids are used during operations such as killing the production tubing, displacing the packer fluid, flushing out tubing scale or debris, and conveying fluid loss pills to the perforations. Workover fluids provide hydrostatic pressure for primary well control and help lift and convey cuttings, scale, sand, and contaminants out of the hole. They may also be used as solvents, dissolving crude oil by-products like wax, asphaltenes, and paraffins, which restrict the tubing bore and affect production. Like completion fluids, they are designed to minimize damage to the producing interval unless the interval is to be abandoned. 4.6.2 Functions of WO Fluids The functions of completion and workover fluids can be divided into two basic categories: active functions and preventive functions. Active functions include the following: • Primary well control Workover fluids provide a level of hydrostatic pressure equal to or greater than formation pressure to avoid kicks during the workover operation. When properly controlled and monitored, fluid hydrostatic pressure may be considered as a barrier. When workover the well or during well servicing activities, workover fluid weight needs to provide an overbalance at top perforations of 3,5 to 7 bar. This best practice has been applied in OMV Petrom in order to protect the formation of excessive differential pressure and safe operations. • Circulation and displacement Fluids remove unwanted material such as sand, debris, cement, spent acid, cuttings, or milled steel cuttings from the well. Fluids also help to spot or circulate cement, acid, kill pills, gelled pills, or frac sand. 4-38 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 4. WELL CONTROL • Cooling and lubricating In workovers that involve deepening or sidetracking a well, the fluid cools and lubricates the drill bit. Some workover operations involve milling of downhole equipment like packers and isolation plugs. The fluid allows the mill to function correctly by removing heat and reducing friction while cutting. Preventive Functions of Fluids Preventive functions of completion and workover fluids include the following: Minimizing fluid losses to the formation Loss of whole fluid into the formation must be controlled. Kicks will result if the fluid level falls and primary well control is lost. In addition, the formation can be damaged by fluids, and workover costs increase when lost fluid must be replaced. If mud is used for workover then an impermeable filter cake against the formation will be formed. This filter cake minimizes the loss of fluid but very often is a cause of formation damage. To avoid additional impairment of formation, clear, solids-free fluids should used. These clear fluids have no solids to build filter cake, so they must prevent fluid loss by either their viscosity or by using additives to bridge across the formation. Preventing formation damage such as oil wetting of reservoir rock, clay swelling, scale precipitation, and solids blockage are important functions of workover fluid. • Maintaining stability over time and at varying temperatures This applies particularly to packer fluids. The fluid must be formulated to remain stable for years even at elevated temperatures. • Preventing corrosion to tubing, casing, and completion components. • 4.6.3 Workover Fluid Properties The various components for the workover or completion fluid should be selected, so that the fluid will function as needed for a specific well. Each WO fluid consists of a base fluid plus a weighting agent. Then an additive package is selected to condition the fluid to the individual requirements of the well. To fulfill the job requirements the following fluid properties should be measured: • • • • • • Density, Viscosity, Turbidity, pH, Crystallization temperature, Fluid loss rate. Density The density of WO or completion brines (inorganic salts and water) changes with temperature and must be corrected so that the brine will have the sufficient density downhole to balance the formation pressure at a specific depth. The calculations to determine a brine density thermal correction are shown below. Example of calculation of required working fluid density to kill the well is shown in Figure 4-16. http://www.petrom.com 4-39 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 4. WELL CONTROL 𝜌𝑤𝑓 = (𝑃𝑅 + ∆𝑃) 0.0000981 ∗ 𝐻𝑚𝑝 𝜌𝑤𝑓 – WO fluid density (Kg/m3) 𝑃𝑅 – Reservoir pressure (bar) ∆𝑃 – Differential pressure (bar) = 1.4 bar (Industry recommended practice) 𝐻𝑚𝑝 – Middle perforation depth 𝜌𝑤𝑓(21℃) = 𝜌𝑤𝑓 + (∆𝑇 − 21)𝐸𝑓 + (𝑃𝑅 ∗ 𝐶𝑓 ) ∆𝑇 = 𝑇𝑠 + 𝑇𝑏ℎ 2 𝜌𝑤𝑓(21℃) –Necessary brine density on surface (kg/m3) 𝜌𝑤𝑓 – Necessary brine density on the depth of the open interval (middle perforation depth) (kg/m3) ∆𝑇 – Average temperature in well (°C) 𝑇𝑠 – Surface temperature (°C) 𝑇𝑏ℎ – Bottom hole temperature (°C) 𝐸𝑓 – Expandability factor (kg/m3/°C) 𝐶𝑓 – Compressibility factor (kg/m3/bar) 𝑝𝑅 – Well working fluid hydrostatic pressure (bar) Table 4-7 Expandability and compressibility coefficients for different brine densities Brine density (kg/m3) 1079-1318 1330-1738 1750-2037 2049-2301 Expandability Factor(kg/m3/°C) 0.51776 0.71180 0.77651 1.035347 Compressibility Factor (kg/m3/KPa) 3.3 ℮-7 2.95 ℮-7 3.82 ℮-7 5.39 ℮-7 Viscosity When required, viscosity is increased with various additives. Increasing viscosity enhances the ability of the fluid to carry or suspend solid particles. It also helps prevent the fluid from flowing into the perforations. WO crew and fluid specialist must control the viscosity of WO fluids. Turbidity Turbidity is related to the cleanliness of the fluid. This property is important when workovers are done in damage-sensitive formations that require clear, solids-free fluids. If a fluid contains undesirable particles of silt, clay, and the like, it scatters light and appears turbid or cloudy. If a fluid is particle free, it appears clear, the opposite of turbid. Turbidity is measured by a turbidity meter, and the measurement is commonly reported in Nephelometric Turbidity Units (NTUs). pH WO fluid pH should be monitored and controlled in order to limit corrosion of downhole equipment, inhibit scale formation, limit formation clay swelling, and ensure that the components of a completion and workover fluid function together properly. 4-40 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL Figure 4-16Density calculation example Crystallization Temperature If the temperature of the fluid falls below a certain point, workover fluids or brine completion containing dissolved salts will crystallize (freeze) or lose density as their salts fall out of solution. When crystallization occurs, crystals give the brine the appearance of slush. The viscosity of the fluid may increase to the point where the crystals plug the lines and the fluid becomes unpumpable. The crew needs to know at what point this crystallization takes place. The fluids engineer or project engineer performs a test using the LCTD (Last Crystal To Dissolve) method. In this test, the brine is stirred constantly as it is cooled below the point where the first crystals appear. Then the fluid is warmed until the last crystal dissolves, which indicates its crystallization temperature, or LCTD. It is possible to lower the temperature below the crystallization temperature without solids forming, as shown in Figure 4-17. Such supercooling is unstable; when solid crystals do eventually form, the heat of crystallization increases the temperature until it reaches the True Crystallization Temperature (TCT) of the remaining solution. The recommended practice for measuring the TCT is provided by the http://www.petrom.com 4-41 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 4. WELL CONTROL API (API RP 13J, 2006) where the first crystal to appear (FCTA) and the TCT must not differ by more than 10.6 oC (51oF). Figure 4-17 Crystallization processes in brines 4.6.4 Components of WO fluids Each fluid begins with a base fluid and a weighting agent. Then an additive package is selected to condition the fluid to fit the specific characteristics of the well. The selected base fluid should satisfy two basic requirements: • It must be capable of controlling the well. • It must protect the formation from permanent permeability damage. Base Fluid Fluids have two main components: • Base fluid (liquid-water/oil or gas Water is the easiest to use and is less expensive than oil-based fluids or gas, but it is not always suitable for a particular formation. • Solids to condition the base fluid to meet the requirements of the well Water based The water in a water-based fluid may come from a variety of sources including produced water (reservoir salt water), fresh water an potable water Oil Based Crude oil or diesel may be used as a base. An oil-in-water emulsion is a fluid of about 40% oil in a salt brine. It is used while gun perforating. Gas For gas-based systems, nitrogen gas is combined with water and a chemical called a surfactant to create stable foam. Foams are used in workovers on wells that have very low formation pressures and therefore will not support the weight of a column of liquid. Nitrogen densities range from 0.1198-0.5991 g/dm3 (1 to 5 ppg ) Clear Brine fluids Clear brine is a fluid made up mainly of chemical salts, such as sodium, chloride, calcium, or potassium chloride. Densities for the various commercially available brines are shown in Table below: 4-42 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 4. WELL CONTROL Table 4-8 Maximum densities of some commercially available brines Common WO fluid brines with approximate maximum densities Max density Fluid brine Formula kg/m³ ppg Potassium chloride KCl 9.6 1150.1 Ammonium chloride NH4Cl 9.7 1162.1 Sodium chloride NaCl 9.9 1186.0 Sodium / potassium chloride NaCl/KCl 10.0 1198.0 Potassium chloride/bromide KCl/KBr 10.9 1305.8 Sodium formate NaCOOH 11.1 1329.8 Sodium/calcium chloride NaCl/CaCl2 11.1 1329.8 Potassium bromide KBr 11.5 1377.7 Calcium chloride CaCl2 11.6 1389.7 Sodium chloride/bromide NaCl/NaBr 12.3 1473.5 Sodium bromide NaBr 12.5 1497.5 Sodium /potassium bromide NaBr/KBr 13.1 1569.4 Potassium formate KCOOH 13.3 1593.3 Calcium Bromide CaBr2 14.9 1785.0 Zink Bromide ZnBr2 19.0 2276.2 Ceasium bromide CsCOOH 19.2 2300.2 Calcium chloride/calcium/zink bromide CaCl2/CaBr2/ZnBr2 19.2 2300.2 Sodium/zink bromide NaBr/ZnBr2 20.5 2455.9 Calcium/zink/sodium bromide CaBr2/ZnBr2/NaBr2 22.5 2695.5 Weighting Material The weighting material in the fluid can be barite (barium sulphate), limestone (calcium carbonate), or inorganic salts such as zinc bromide, calcium chloride, sodium chloride, or potassium chloride. Additives Additives are used to condition the fluid to meet the well requirements. The most common fluid additives and their basic uses are listed in table below (Table 4-9): Table 4-9 Common additives and their uses Aditive Viscosifiers Surfactants Bridging agents pH Control Inhibitors Bactericides Use Fluid loss control, gas migration control, suspending agent Aids in recovering fluid used to load hole, emulsifier Fluid loss control Clay damage control, corrosion control, H2S inhibition Inhibitors Scale and corrosion control Scale and corrosion control Controls bacteria counts Commonly Used Brines Some of the most commonly used brines include: • Sodium chloride, • Potassium chloride, • Calcium chloride. Sodium Chloride Statistically, sodium chloride (NaCl) is the most commonly used brine. It can be mixed in densities from 1006.54 – 1186.0 kg/m3 (8.4 to 9.9 ppg). Many brine charts show the upper limit of NaCl brine as 1198.26 kg/m3 (10.0 ppg), but this density is difficult to achieve in the field. That number is based on laboratory conditions—using distilled water and chemically pure salt and stirring with a highhttp://www.petrom.com 4-43 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 4. WELL CONTROL speed blender. The crystallization temperature range is -0.55°C (31°F) for 1006.54kg/m3 (8.4 ppg) down to -20.55°C(-5°F) for 1174.3kg/m3 (9.8 ppg). Potassium Chloride Potassium chloride (KCl) can be mixed in densities from 1006.54 - 1150.1 kg/m3 (8.4 to 9.6 ppg). The crystallization temperature range is -0.55°C (31°F) for 1006.54kg/m3 (8.4 ppg) to 15.55°C (60°F) for 1150.1kg/m3 (9.6 ppg). A 2% KCl solution, which requires NaCl, is so commonly used (for clay inhibition). Calcium Chloride Calcium chloride (CaCl2) can be mixed in densities from 1006.54-1389.99 kg/m3 (8.4 to 11.6 ppg), so it provides a large density range. The crystallization temperature range is -0.55°C (31°F) for 1006.54kg/m3 (8.4 ppg) to 6.7°C (44°F) for 11.6 ppg. Dry calcium chloride is available in two grades: 77% and 94%. The 94% grade is preferred since it contains fewer unidentified solids. For economic reasons, solutions of NaCl/CaCl2 are sometimes used instead of CaCl2 only. Mixing CaCl2 produces an exothermic (heat-generating) reaction, so the WSS should ensure that personnel take precautions to avoid burns. 4.7 Well Control Workflow 4.7.1 Well Control Best Practices Workflow Applied in OMV Petrom The general workflow of well control process includes the following steps: • Collect correct well and reservoir information. • Ensure the appropriate numbers of barriers are always in place depending on risk estimation. • Barrier integrity shall be proved and maintained by testing. • Select the method for killing/controlling well using available information. • Monitor workover operations and remain constantly alert for unplanned situations. • Suspend operations immediately at the first sign of: Barrier loss. Adverse well flowing conditions. Underground flows (casing leaks etc). Equipment leaks (wellhead leaks, subsurface valve leaks). If a barrier fails causing the minimum number of barriers to fall below the required number, wellhead operations must stop and the barrier repaired or another competent barrier installed. When the required number of barriers is back to minimum standard, wellhead operations may resume. General Well Control workflow during workover of any type of well according to the previous description is shown in Figure 4-18. Early detection of a kick and prompt initiation of control procedures are the keys to successful well control. Casing pressures resulting from a kick depend upon the volume and density of the invading fluid, as well as the differential between the formation gradient and fluid gradient. The recommended workflow to early recognize the nature of invading fluid is show in Figure 4-19 and Figure 4-20. 4-44 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL Figure 4-18 General well workflow for well control during workover execution http://www.petrom.com 4-45 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 4. WELL CONTROL Figure 4-19 Recommended workflow for determination of the nature of invading kick fluids 4-46 http://www.petrom.com 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL Figure 4-20 Recommended workflow for determination of the nature of invading kick fluids (continuation) http://www.petrom.com 4-47 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 4. WELL CONTROL 4.7.2 Well Control Complications (Holes in Tubing, Reversing Gas Kicks, Problems with Circulating/Lost etc.) Holes in Tubing Holes in the tubing string create undesirable communication, or leaks, between the tubing and casing, which complicates well control operations. Even a relatively simple operation like bullheading can become difficult if leaks have developed between the strings. One of the best ways to seal or pack off the leak is to install a pack-off assembly, which can be conveyed and set by means of either wireline or coiled tubing. The first step in packing off the holes is to locate the area of communication by using a collar stop running tool and a ponytail. The collar stop running tool is used to install a stop in 8-round tubing (8 rounded threads per inch) to keep wireline and other tools from falling out the end of the tubing if they are inadvertently dropped. The stop is essential with any side-pocket gas-lift work because it prevents the loss of a dropped gas-lift dummy or valve. As the WSS, you can record the depth or depths at which the running tool encountered the holes and use this information to decide whether to attempt to install a pack-off. If it seems feasible to run a pack-off, determine the internal diameters of the downhole safety valve, tubing nipples, and sliding sleeve(s) as well as the internal diameter and drift of the tubing. If there are multiple holes in the tubing, also determine the distance from the uppermost hole to the lowermost hole. This distance can affect the design and installation of the pack-off assembly, which consists of the lower pack-off, the spacer pipe, and the upper pack-off. With the data in hand: 1. 2. 3. Run and set a lower tubing stop to provide an anchor point for the lower pack-off assembly. Run the pack-off assembly and place it on the tubing stop. Install an upper tubing stop to serve as an upper anchor point. If the procedure is successful, the holes will be packed off, allowing fluid to be pumped down the spacer pipe while isolating the tubing and casing from each other. Curing lost circulation Lost circulation is a common phenomenon in completion and workover operations. When working with clear fluids whilst maintaining a pressure overbalance in the wellbore, lost circulation is usually unavoidable. Excessive losses may cause long term permeability impairment and is also economically unacceptable when working with expensive brines or brines which have undergone expensive treatment, e.g. filtration. Spotting highly viscous pills of clear brine is the most common method to combat lost circulation. Other, more drastic methods comprise spotting pills of viscosified brines containing degradable bridging material. Compositions are given in the above sections. By increasing the particle size range of the bridging solids, pills can be formulated which are more effective in situations where massive losses are to be cured. 4-48 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL In case a more permanent seal is required, for instance in the event of extensive workover activities, one may consider to spot an acid-soluble cement, such as Magneset. The design of Magneset is similar to that for normal cement slurries, i.e. it requires the addition of retarders or accelerators depending on bottomhole temperature. Formulation requires laboratory testing. Problems While Circulating Mechanical problems and equipment failures can occur while circulating kicks. The following section describes these problems and the recommended solutions. Choke Washout A choke that is washing out or cutting out can be initially difficult to detect, but an alert crew will notice certain warning signs. The first indication that the choke has washed out is its failure to seal when fully closed. Another indication, though not as noticeable, is a pattern of frequent choke adjustments during a stage of the kill operation when such adjustments are not usually required. The solution is simple: change to another choke after isolating the faulty choke using upstream and downstream valves on the choke manifold. After the well is dead, the faulty choke should be repaired, tested, and returned to service. If there is no other choke available, you may have to replace the washed-out choke before proceeding with the kill operation. Plugged Choke An increase in casing pressure followed by an increase in pump pressure can indicate a plugged choke. Both pressures may rise sharply, and this sharp increase can be very detrimental to the well. Another indicator of a plugged choke is a loss of returns in conjunction with the sharp increase in pressures. Therefore, if the crew notices that the choke has become plugged, they should immediately shut down the pump. As with a washed-out choke, the remedy is to change to another choke after isolating the plugged choke by upstream and downstream valves. Using the second choke, bleed any trapped pressure from the well and continue circulating. Once the well is dead, the plugged choke should be cleaned out. This can be quite hazardous, and in some cases, it would be advisable to turn this operation over to specialists who are equipped to deal with the quantity of solids that may be trapped in the choke body and the resulting high pressure. Any sudden release of pressure or trapped solids could seriously injure or kill personnel nearby. Work-String Washout Like the washed-out choke, a washed-out work string can be somewhat hard to detect at first. In theory, as the string begins to wash out, pump pressure will decline. However, the decline is so gradual that it often goes unnoticed. The hole will continue enlarging until the tubing fails. Another indication of a string washout is the premature return of kill weight fluid if a lighter fluid is being replaced by a heavier one. The floorhands should be made aware that most washouts occur at connections or in slip areas and should watch for any of the telltale signs by inspecting each joint. At the first sign of a washout, the joint in question should be removed from the work string, laid aside, and painted with conspicuous red paint so it is not inadvertently picked up and used again. http://www.petrom.com 4-49 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 4. WELL CONTROL Plugged Work String When a work string plugs up, the pump pressure will noticeably increase without an increase in the casing pressure. In fact, the casing pressure may decline a bit along with a decrease in return flow. If this decline takes place, the crew should stop the pump and the choke and shut in the well. The crew can pump up the pressure on the work string to try to free the obstruction. However, pumping up the pressure on the annulus may damage the wellbore and the producing formation and is therefore not recommended. If pumping up the pressure does not remove the obstruction, then begin volumetric well control and plan to perforate the work string to reestablish conventional well control. 4.8 Quality and Safety Requirements for Well Control 4.8.1 Quality Control All tubing pressure tests performed should be for a minimum period of 15 minutes. A 10% drop from the initial pressure is acceptable provided that the pressure remains constant for at least the final 5 minutes. • For all tubing/production casing annulus tests, the annulus shall be filled and the side outlet kept open. The annulus shall be monitored for flow during testing. The side outlets shall be closed after the test. • Check burst and collapse ratings of tubing, casing and auxiliary equipment prior to a pressure test. The effect of tension on the collapse and effect of buckling on the tensile yield shall also be considered. • Particular attention shall be paid to actuation pressures of completion accessories (e.g. gas lift valves, shear-out valves) to avoid accidental actuation of such equipment. Areas where pressure testing is to be conducted shall be isolated. Tests shall be preceded by a 5 minute 20 bar low pressure integrity check. Consideration shall be given to the consequences of a leak on the integrity of the system. Pressures shall be increased in a stepwise manner. All pressure test must hold for a minimum of 10 minutes. A pressure drop of up to 2% within first 5 minutes is acceptable, provided the pressure remains stable for the remaining 5 minutes. Testing period for completions is 15 minutes. All tests shall be recorded and copies retained in the well record, with a log of volumes pumped and returned. • All Well Control Equipment shall be tested as per the requirements of API Spec 16A and API RP 53. • All pressure containing casing, liner, completion or tubing strings shall be tested prior to being drilled out or perforated. Pressure tests shall not cause loads to exceed any of: 80% of API burst, a tri-axial stress 80% of nominal yield, connection pressure rating or 75% of connection tensile rating. Surface and intermediate casing shall be tested to the greater of the well control burst design case and the planned casing seat test inclusive of a 10% margin. The minimum test for casing and liners where production or testing is planned shall be taken as the shut-in tubing pressure on top of the planned completion fluids. Liner laps shall be tested to demonstrate integrity both in respect of 4-50 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL internal pressure and inflow sufficient to demonstrate integrity against anticipated load cases. Production and test tubing shall be tested to the maximum anticipated surface pressure. • Surface well testing, completion and treatment equipment and associated safety systems shall be function tested. Pressure test upstream of the choke shall be taken to the maximum anticipated working pressure and full working pressure downstream of the chokes. Barrier Tests Barrier integrity shall be proved and maintained by testing as follows: 1. Open barriers (BOPs, valve, etc) are to be tested regularly at prescribed intervals. 2. Fixed mechanical barriers shall be tested upon installation. 3. Testing shall be as per the application of the flow if feasible and practical (eg. Valve should be tested in the direction of the pressure or flow). Testing in the opposite direction of the flow may be acceptable subject to approval. 4. Barriers must be leak tight, or meet the standard of acceptable leak rate per API RP 14B and RP 14H for xmas tree valves. 5. Pressure tests shall be held for a minimum of 10 minutes for the maximum anticipated pressure plus adequate safety factor. Zero pressure decline over the 10 minute test period is required to pass the test. 6. Inflow tests shall be conducted for a minimum of 30 minutes with the full differential pressure anticipated. 7. Wireline plugs can only be used as a barrier if they have been tested and have hydrostatic pressure on top that sufficient to over balance the well pressure. In other words, the wireline plug and hydrostatic column are considered integral and not independent of each other. 8. Tubing hanger can only be passed as a barrier if it has been tested from below (eg. In the direction of the flow, through a test port). 9. Cement plug test criteria is to tag with weight, pressure test and/or inflow test. Pressure test must be greater than the fracture gradient of the formation below the cement. 10. Casing and shoe track with cement floats are a barrier if pressure tested by bumping the plug when cementing and the floats held against the cement column outside the casing. Standard IPM-ST-WCI-012 requires at least two barriers at all times. The WSS should review this entire standard to ensure compliance with all its conditions Filters which are in use in OMV Petrom Filtration may be required for a variety of completion activities such as gravel packing or overbalance perforating. It is critical for fluids that may be exposed to the reservoir. Filtration can be performed on incoming fluids (e.g. to remove shipping-related contamination), during circulation operations or offline (between circulation operations). Filters progressively plug over time; this plugging increases the pressure differential and eventually the filtration medium must be recharged or replaced. However, this capture of particles within the filter medium progressively restricts the flow of fluids and therefore the capture of fine particles improves over time. A number of different filtration technologies are available. The two most common are the filter press (plate/frame) and the cartridge filter (Figure 4-22 and Figure 4-23). The filter press (Figure 4-21) consists of a series of vertical parallel chambers. http://www.petrom.com 4-51 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 4. WELL CONTROL Figure 4-21 Plate/Frame filters In the chambers there are plates holding a filter cloth. This arrangement maximizes the surface area of the filter medium. The purpose of the filter cloth is not to filter the fluids but to hold precoat material (initially in a layer of around 1/8 in.). Precoat is a material with a large surface area; it is added to the filter press before filtration operations and may be continually added during filtering, in which case it is called filter aid. The most common precoat/filter aid is diatomaceous earth (DE). Figure 4-22 Catridge filter unit 4-52 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 4. WELL CONTROL Figure 4-23 Replacing cartridges in a dual pod cartridge filter 4.8.2 Safety Assurance High density brines have unique chemical properties. Consequently, they should be handled in a different manner than conventional muds, especially for safety reasons. Personnel safety when handling these brine systems involves two aspects: 1) Education of all personnel 2) Proper safety apparel. A brine is simply a salt (or a blend of salts) plus water. Low concentrations of these salts cause little or no problem. Commercially available salts currently used in OMV Petrom are: • Sodium chloride (NaCl) • Potassium chloride (KCl) • Calcium chloride (CaCl2) This is a list of the minimum safety apparel which should be worn when working with or in the vicinity of brines: • Hard hats • Chemical splash goggles • Rubber gloves • Rubber boots • Aprons/slicker suits • Disposable dust/mist respirators Rig Safety Equipment Following is a list of the minimum safety equipment that should be available when working on a WO rig with brines: http://www.petrom.com 4-53 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 4. WELL CONTROL • • • Eye wash fountains and drench showers Pipe wipers Floor mats 4.8.3 Personnel Requirements It is required to verify that the rig contractor’s personnel have received formal workover well control training and possess valid certificates. There are two widely accepted certificates for workover well control training: Workover/Completion Well Control, Supervisory Level Certificate. This certificate is issued by the International Association of Drilling Contractors (IADC) under the organization’s WellCAP program and is printed with the familiar IADC logo. Workover and Completion Supervisor Certificate. This certificate was issued by the U.S. Minerals Management Service (MMS) prior to 15 October 2002. The MMS no longer issues this certificate. Each type of certificate is valid for two years. Its expiration date should be checked. A third certifying agency, the International Well Control Forum (IWCF), issues drilling and well intervention well control certificates, but it does not issue workover well control certificates at this time. IWCF well intervention training covers wireline, coiled tubing, and snubbing operations. If these operations are part of the workover, you may require that the wireline, coiled tubing, or snubbing operators possess the appropriate certificate. IADC also issues these certificates, and MMS issued them prior to 15 October 2002. Complying with the H2S Standard Key points from the document that are relevant to planning and preparation are as follows: Each operation in an H2S area shall have a written H2S Emergency Response Plan (ERP). A site contingency plan must be in evidence, with all ERP information posted. Site plans for shut-in and evacuation must be read and understood by Site Supervisor and company personnel prior to rigging up any equipment on location. • The H2S Contingency Plan shall be tested prior to start-up in suspected or known H2S areas. • The H2S Contingency Plan shall be tested periodically by performing H2S drills. • H2S drills shall be held at least on a weekly basis when working in a suspected or known H2S area. • The drills shall be preplanned and shall emphasize the key learning point(s). • The drills shall be held on varying days of the week and at varying times. • Training shall meet local regulations, Client or requirements. • Crews working on H2S wells must be certified to H2S level 2 by a qualified instructor. • Crews working in non suspected H2S areas must have completed H2S level • Standard working limit is max 10 PPM free H2S in the produced gas or in gas associated with produced oil or gas evolving from drilling mud circulated from an H2S well. 10 PPM is the trigger level of our detection equipment. At any concentration above this, special breathing apparatus must be worn, otherwise all work is to be terminated immediately and all personnel evacuated. 4-54 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 4. WELL CONTROL Appendix 4 A Physical Properties of Potassium Chloride Table 4-10 Physical Properties of Potassium Chloride (API) 1 2 % Wt Specific Gravity 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0 21.0 22.0 1.005 1.011 1.017 1.024 1.030 1.037 1.044 1.050 1.057 1.063 1.070 1.077 1.084 1.091 1.097 1.104 1.111 1.119 1.126 1.133 1.140 1.147 23.0 24.0 1.155 1.162 3 Density 4 KCl 5 H2O (lbm/gal) (lbm/bbl) (gal/bbl) 8.37 3.5 41.8 8.42 7.1 41.6 8.47 10.7 41.4 8.53 14.4 41.3 8.59 18.1 41.1 8.64 21.8 40.9 8.69 25.6 40.7 8.75 29.4 40.5 8.80 33.3 40.4 8.86 37.3 40.2 8.90 41.2 40.0 8.97 45.3 39.8 9.03 49.4 39.6 9.08 53.5 39.4 9.12 57.6 39.1 9.20 61.9 38.9 9.26 66.1 38.7 9.32 70.5 38.5 9.38 74.9 38.3 9.44 79.3 38.0 9.51 83.9 37.8 9.56 88.4 37.6 9.64 9.68 93.1 97.7 37.4 37.1 6 KCl (mg/L) 10,000 20,200 30,500 41,000 51,500 62,200 73,000 84,000 95,100 106,300 117,700 129,200 140,900 152,700 164,600 176,700 188,900 201,300 213,900 226,622 239,500 252,400 265,700 278,900 http://www.petrom.com 7 8 Chlorides Vol.Incr. Factor (mg/L) 9 Crystallization Point (°F) 4,756 9,606 14,506 19,499 24,493 29,582 34,718 39,950 45,229 50,556 55,977 61,447 67,011 72,623 78,282 84,038 89,840 95,737 101,730 107,770 114,000 120,040 1.005 1.009 1.013 1.017 1.022 1.026 1.031 1.035 1.039 1.045 1.050 1.055 1.061 1.066 1.072 1.078 1.084 1.090 1.097 1.104 1.111 1.117 31.2 30.3 29.5 28.6 27.8 26.9 26.1 25.2 24.3 23.4 22.4 21.4 20.4 20.0 18.5 17.0 16.0 15.0 14.0 13.0 22.0 34.0 126,473 132,643 1.125 1.132 48.0 59.0 4-55 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 4. WELL CONTROL Table 4-11 Physical Properties of Potassium Chloride (SI) 1 2 % Wt Specific Gravity 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0 21.0 22.0 23.0 24.0 1.005 1.011 1.017 1.024 1.030 1.037 1.044 1.050 1.057 1.063 1.070 1.077 1.084 1.091 1.097 1.104 1.111 1.119 1.126 1.133 1.140 1.147 1.155 1.162 3 Density 3 (Kg/m ) 1,002.94 1,008.93 1,014.93 1,022.12 1,029.31 1,035.30 1,041.29 1,048.48 1,054.47 1,061.66 1,066.45 1,074.84 1,082.03 1,088.02 1,092.81 9.20 9.26 9.32 9.38 9.44 9.51 9.56 9.64 9.68 4 KCl 5 H2O (g/l) 10.00 20.29 30.57 41.14 51.71 62.29 73.14 84.00 95.14 106.57 117.71 129.43 141.14 152.86 164.57 61.9 66.1 70.5 74.9 79.3 83.9 88.4 93.1 97.7 (ml/L) 995.20 990.44 985.68 983.30 978.53 973.77 969.01 964.25 961.87 957.11 952.34 947.58 942.82 938.06 930.92 38.9 38.7 38.5 38.3 38.0 37.8 37.6 37.4 37.1 6 KCl 7 8 Chlorides Vol.Incr. Factor (ppm) (ppm) 9,950.25 4,732.34 1.005 19,980.22 9,501.48 1.009 29,990.17 14,263.52 1.013 40,039.06 19,041.99 1.017 50,000.00 23,779.61 1.022 59,980.71 28,526.52 1.026 69,923.37 33,254.79 1.031 80,000.00 38,047.62 1.035 89,971.62 42,789.97 1.039 100,000.00 47,559.74 1.045 110,000.00 52,314.95 1.050 119,962.86 57,053.85 1.055 129,981.55 61,818.27 1.061 139,963.34 66,565.54 1.066 150,045.58 71,360.07 1.072 160,054.35 76,121.38 1.078 170,027.00 80,864.09 1.084 179,892.76 85,555.85 1.090 189,964.48 90,346.36 1.097 200,019.42 95,119.15 1.104 210,087.72 100,000.00 1.111 220,052.31 104,655.62 1.117 230,043.29 109,500.43 1.125 240,017.21 114,150.60 1.132 Table 4-12 Formulas used in Table 4-10 and Table 4-11 Formulas: Salt (lbm/bbl Water) = Vol. Increase Factor x KCl (Lbm/bbl) Specific Gravity = 1.00056 + 1.22832 (10-6) (Cl -, mg/l) Volume Increase Factor = 1+ (2.775 x 107)(Cl -) 1.105 4-56 http://www.petrom.com 9 Crystallization Point (°C) -0.44 -0.94 -1.39 -1.89 -2.33 -2.83 -3.28 -3.78 -4.28 -4.78 -5.33 -5.89 -6.44 -6.67 -7.50 -8.33 -8.89 -9.44 -10.00 -10.56 -5.56 1.11 8.89 15.00 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 4. WELL CONTROL Appendix 4 B Physical Properties of Sodium Chloride Table 4-13 Physical Properties of Sodium Chloride (API) 1 2 3 4 5 6 7 8 9 10 Aw % Wt NaCl H2O Specific Density Gravity (lbm/gal) (lbm/bbl) (gal/bbl) NaCl Chlorides Vol.Incr. (mg/L) (mg/L) Factor Crystallization Point (T)(°F) 1.0 1.007 8.40 3.5 41.87 10,070 6,108 1.003 31.0 0.996 2.0 1.014 8.46 7.1 41.75 20,286 12,305 1.006 30.0 0.989 3.0 1.021 8.52 10.7 41.63 30,630 18,580 1.009 28.8 0.983 4.0 1.029 8.58 14.4 41.46 41,144 24,957 1.013 27.7 0.976 5.0 1.036 8.65 18.2 41.34 51,800 31,421 1.016 26.5 0.970 6.0 1.043 8.70 21.9 41.10 62,586 37,963 1.020 25.3 0.964 7.0 1.050 8.76 25.8 41.02 73,500 44,584 1.024 24.1 0.957 8.0 1.058 8.83 29.7 40.86 84,624 51,331 1.028 22.9 0.950 9.0 1.065 8.89 33.6 40.70 95,850 58,141 1.032 21.5 0.943 10.0 1.073 8.95 37.6 40.54 107,260 65,062 1.036 20.2 0.935 11.0 1.080 9.01 41.6 40.38 118,800 72,062 1.040 18.8 0.927 12.0 1.088 9.08 45.7 40.19 130,512 79,166 1.045 17.3 0.919 13.0 1.095 9.14 49.9 40.00 142,350 86,347 1.050 15.7 0.910 14.0 1.103 9.20 54.1 39.85 154,392 93,651 1.054 14.1 0.901 15.0 1.111 9.27 58.4 39.66 166,650 101,087 1.059 12.4 0.892 16.0 1.118 9.33 62.7 39.44 178,912 108,524 1.065 10.6 0.882 17.0 1.126 9.40 67.1 39.25 191,420 116,112 1.070 8.7 0.872 18.0 1.134 9.46 71.5 39.03 204,102 123,804 1.076 6.7 0.861 19.0 1.142 9.53 76.0 38.85 216,980 131,616 1.081 4.6 0.850 20.0 1.150 9.60 80.6 38.64 229,960 139,489 1.087 2.4 0.839 21.0 1.158 9.66 85.2 38.43 243,180 147,508 1.090 0 0.827 22.0 1.166 9.73 89.9 38.22 256,520 155,600 1.099 -2.5 0.815 23.0 1.174 9.80 94.6 37.97 270,020 163,789 1.106 -5.2 0.802 24.0 1.183 9.87 99.5 37.74 283,800 172,147 1.113 11.4 0.788 25.0 1.191 9.94 104.4 37.50 297,750 180,609 1.120 15 0.774 26.0 1.199 10.01 109.3 37.27 311,818 189,143 1.127 25 0.759 http://www.petrom.com 4-57 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 4. WELL CONTROL Table 4-14 Physical Properties of Sodium Chloride (SI) 9 10 Crystallization Point (T)(°C) Aw 1.003 -0.56 0.996 1013.728 20.28569 994.0091 20,005.92 12,135.11 1.006 -1.11 0.989 1.021 1020.918 30.5714 30,000.00 18,197.85 1.009 -1.78 0.983 4.0 1.029 1028.107 41.14282 987.1046 39,984.45 24,253.64 1.013 -2.39 0.976 5.0 1.036 1036.495 51.99995 984.2475 50,000.00 30,329.15 1.016 -3.06 0.970 6.0 1.043 1042.486 62.57137 978.5335 60,005.75 36,397.89 1.020 -3.72 0.964 7.0 1.050 1049.676 73.71421 976.6288 70,000.00 42,460.95 1.024 -4.39 0.957 8.0 1.058 1058.064 84.85706 972.8194 79,984.88 48,517.01 1.028 -5.06 0.950 9.0 1.065 1065.253 95.9999 90,000.00 54,592.49 1.032 -5.83 0.943 10.0 1.073 1072.443 107.4285 965.2006 99,962.72 60,635.60 1.036 -6.56 0.935 11.0 1.080 1079.632 118.857 961.3913 110,000.00 66,724.07 1.040 -7.33 0.927 12.0 1.088 1088.02 130.5713 956.8676 119,955.88 72,762.87 1.045 -8.17 0.919 13.0 1.095 1095.21 142.5713 952.344 130,000.00 78,855.71 1.050 -9.06 0.910 14.0 1.103 1102.399 154.5713 948.7727 139,974.61 84,905.71 1.054 -9.94 0.901 15.0 1.111 1110.787 166.857 944.2491 150,000.00 90,987.40 1.059 -10.89 0.892 16.0 1.118 1117.977 179.1427 939.0112 160,028.62 97,069.77 1.065 -11.89 0.882 17.0 1.126 1126.364 191.7141 934.4876 170,000.00 103,119.01 1.070 -12.94 0.872 18.0 1.134 1133.554 204.2855 929.2497 179,984.13 109,174.60 1.076 -14.06 0.861 19.0 1.142 1141.942 217.1426 924.9641 190,000.00 115,250.44 1.081 -15.22 0.850 20.0 1.150 1150.33 230.2855 919.9643 199,965.22 121,294.78 1.087 -16.44 0.839 21.0 1.158 1157.519 243.4283 914.9645 210,000.00 127,381.69 1.090 -17.78 0.827 22.0 1.166 1165.907 256.8569 909.9647 220,000.00 133,447.68 1.099 -19.17 0.815 23.0 1.174 1174.295 270.2854 904.0125 230,000.00 139,513.63 1.106 -20.67 0.802 24.0 1.183 1182.683 284.2854 898.5366 239,898.56 145,517.33 1.113 -11.44 0.788 25.0 1.191 1191.07 298.2854 892.8225 250,000.00 151,644.84 1.120 -9.44 0.774 26.0 1.199 1199.458 312.2854 887.3465 260,065.05 157,750.63 1.127 -3.89 0.759 1 2 3 4 5 6 Density NaCl H2O NaCl 3 % Wt Specific Gravity (g/l) (ml/L) (ppm) 1.0 1.007 1006.538 9.99999 996.8661 10,000.00 6,065.54 2.0 1.014 3.0 (Kg/m ) 991.152 969.01 7 8 Chlorides Vol.Incr. Factor (ppm) Table 4-15 Formulas used in Table 4-13 and Table 4-14 Formulas: Salt (Lbm/bbl Water) = Volume Increase factor x NaCl (Lbm/bbl) Specific Gravity = 1.0036 [0.99707+6.504(10-3)(%Wt NaCl) + 4.395 (10-5)(%Wt NaCl) 2 ] or 1 + 1.94(10-6)(Cl -,mg/L)0.95 Volume Increase Factor = 1.00045 + 2.72232 (10-3)(%wt NaCl) + 8.15591 (10-5) (%wt NaCl) 2 Or 1+5.88 (10-8)(Cl -, mg/L)1.2 Formation Activity Coefficient Aw = 0.99755 - 4.3547 (10-3) (%Wt NaCl) - 1.8205 (10-4) (%Wt NaCl) 2 %wt CaCl2 = [(100 % NaCl 2 (g/L) x %Purity NaCl 2)/Specific Gravity x 350 ]x 0.35 4-58 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL Appendix 4 C Physical Properties of Calcium Chloride Table 4-16 Physical Properties of Calcium Chloride (API) http://www.petrom.com 4-59 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL Table 4-17 Physical Properties of Calcium Chloride (API) (Continuation) 4-60 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL Table 4-18 Physical Properties of Calcium Chloride (SI) http://www.petrom.com 4-61 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 4. WELL CONTROL Table 4-19 Physical Properties of Calcium Chloride (SI) (Continuation) Table 4-20 Formulas used in Table 4-16, Table 4-17, Table 4-18 and Table 4-19 Formulas: Salt (Lbm/bbl Water) = Volume Increase factor x CaCl (Lbm/bbl) Specific Gravity = 1.0036 [0.99707+6.504(10-3)(%Wt CaCl) + 4.395 (10-5)(%Wt CaCl)2 ] or 1 + 1.94(10-6)(Cl-,mg/L)0.95 Volume Increase Factor = 1.00045 + 2.72232 (10-3)(%wt CaCl) + 8.15591 (10-5) (%wt CaCl)2 Or 1+5.88 (10-8)(Cl-, mg/L)1.2 Formation Activity Coefficient Aw = 0.99755 - 4.3547 (10-3) (%Wt CaCl) - 1.8205 (10-4) (%Wt CaCl)2 %wt CaCl2 = (100%CaCl2 (lbm/bbl) x %Purity CaCl2)/Specific Gravity x 350 %wt CaCl2 = [(100 % CaCl2 (g/L) x %Purity CaCl2)/Specific Gravity x 350 ]x 0.35 4-62 http://www.petrom.com 2012 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 4. WELL CONTROL Appendix 4 D Physical Properties of Ammonium Chloride Table 4-21 Physical Properties of Ammonium Chloride (API) Density lb/gal Specific bbls Lbs NH4Cl Water Gravity per bbl per bbl @ 60 0 F Brine Brine % Weight (NH4Cl) 8.4 1.007 7.0 0.990 1.98 8.45 1.013 10.5 0.981 3.00 8.5 1.020 19.0 0.969 5.30 8.6 1.031 30.0 0.940 8.40 8.7 1.044 42.0 0.919 11.50 8.8 1.055 53.0 0.900 14.40 8.9 1.068 65.0 0.881 17.40 9.0 1.079 77.0 0.860 20.40 9.1 1.128 88.0 0.840 23.00 9.2 1.103 100.0 0.819 25.90 9.5 1.139 135.0 0.750 33.90 Table 4-22 Physical Properties of Ammonium Chloride (SI) Density Specific Gravity Kg/m3 @ 15 0 C % (g) NH4Cl (g) Water Weight per (L) per (L) (NH4Cl) Brine Brine 1,006.54 1.007 20.0000 2.8286 1.98 1,012.53 1.013 30.0000 2.8029 3.00 1,018.52 1.020 54.2857 2.7686 5.30 1,030.50 1.031 85.7142 2.6857 8.40 1,042.49 1.044 119.9999 2.6257 11.50 1,054.47 1.055 151.4284 2.5714 14.40 1,066.45 1.068 185.7141 2.5171 17.40 1,078.43 1.079 219.9998 2.4571 20.40 1,090.42 1.128 251.4283 2.4000 23.00 1,102.40 1.103 285.7140 2.3400 25.90 1,138.35 1.139 385.7139 2.1429 33.90 http://www.petrom.com 4-63 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 4. WELL CONTROL List of Figures Figure 4-1 Tubing/annulus friction pressure distribution, Figure 4-2 Pressure profile during bleeding with mechanically induced kick, Figure 4-3 Pressure profile during bleeding with light fluid in the hole, Figure 4-4 Forward circulation tubing pressure, Figure 4-5 Reverse circulation kill graph, Figure 4-6 Reverse circulation tubing pressure – kill fluid is heavier than completion fluid, Figure 4-7 Reverse circulation annulus pressure – kill fluid is heavier than completion fluid, Figure 4-8 Reverse circulation – kill fluid is approximately equal to completion fluid, Figure 4-11 Technology Workflow for Selection Well Killing Method, Figure 4-12 Surface BOP vertical well kill sheet, Figure 4-13 Surface BOP vertical well kill sheet (continuation), Figure 4-14 Typical Ram preventer, Figure 4-15 Control unite CH-U 3000, Figure 4-16Density calculation example, Figure 4-17 Crystallization processes in brines, Figure 4-18 General well workflow for well control during workover execution, Figure 4-19 Recommended workflow for determination of the nature of invading kick fluids, Figure 4-20 Recommended workflow for determination of the nature of invading kick fluids (continuation), Figure 4-21 Plate/Frame filters, Figure 4-22 Catridge filter unit, Figure 4-23 Replacing cartridges in a dual pod cartridge filter. 4-64 http://www.petrom.com 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 4. WELL CONTROL List of Tables Table 4-1 Number of barriers depend on well risk classification, Table 4-2 Minimum number of barriers on annulus and tubing/casing (high risk wells), Table 4-3 Minimum number of barriers on annulus and tubing/casing (medium risk wells), Table 4-4 Minimum numbers of barriers on annulus and tubing /casing (low risk wells), Table 4-5 Types of BOPs used in OMV Petrom, Table 4-6 Summary of BOP application in OMV Petrom, Table 4-7 Expandability and compressibility coefficients for different brine densities, Table 4-8 Maximum densities of some commercially available brines, Table 4-9 Common additives and their uses, Table 4-10 Physical Properties of Potassium Chloride (API), Table 4-11 Physical Properties of Potassium Chloride (SI), Table 4-12 Formulas used in Table 4-10 and Table 4-11, Table 4-13 Physical Properties of Sodium Chloride (API), Table 4-14 Physical Properties of Sodium Chloride (SI), Table 4-15 Formulas used in Table 4-13 and Table 4-14, Table 4-16 Physical Properties of Calcium Chloride (API), Table 4-17 Physical Properties of Calcium Chloride (API) (Continuation), Table 4-18 Physical Properties of Calcium Chloride (SI), Table 4-19 Physical Properties of Calcium Chloride (SI) (Continuation), Table 4-20 Formulas used in Table 4-16, Table 4-17, Table 4-18 and Table 4-19, Table 4-21 Physical Properties of Ammonium Chloride (API), Table 4-22 Physical Properties of Ammonium Chloride (SI). http://www.petrom.com 4-65 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 4. WELL CONTROL References 1. OMV Petrom Internal Documents • Types of workover fluids used in Petrom OMV, Technical procedure (draft version). • IWCF Training material, Ploesti, 2011 • Internal well control training – for well intervention and workover, Suplac, January 7th 2011. • Well Control Equipment Types of BOP (Blow Out Preventer), Suplac, January 7th 2011. • Kalser E. : General Information – Workover Manual (procedures under development) • Equipment Specifications used in OMV Petrom SA). • WO Fluids and Additives Specifications. • OMV Petrom SA standards used for well control. • Well Control Applications Analysis in Petrom OMV. • Blowout Preventers (types, selection). • Well Control Instruments (Pictures). • Kill Well Calculation Sheet , Well Control Calculation Model. • Petrom Drilling Standard (Sep. 2008). • API RP-53 Blowout Prevention Equipment & systems for Drilling Operations, Third edition • API RP-54 Oil and Gas Well Drilling and Servicing Operations, Second edition 2. API RP-53 Blowout Prevention Equipment & systems for Drilling Operations, Third edition 3. API RP-54 Oil and Gas Well Drilling and Servicing Operations, Second edition 4. Aberdeen Drilling Schools Well Control for the Rig –Site Drilling team, Training Manua, 2002 Revised Edition 5. Alberta recommended Practice (ARP), Completing and Servicing Critical Sour Wells, 98/04 6. Baker Hughes INTEQ Fluidos – Manual de Ingenieria, 1998. 7. Caledonia Training & Consultancy Ltd, Well Intervention Pressure Control, Aberdeen, Scotland (Aug. 2003). 8. Neal Adams, Workover Well Control, Penn Well Publishing Company, Tulsa, Oklahoma (1981). 9. Schlumberger, Well Control For Workover Operations, 1999 10. Well Control for Completion and Workover by Well Control School, Petroleum Extension Service, 1992 11. Well Control Manual, Enterprise Oil, October 2001, Revision 2 12. Well Control for Completion and Workover, By Well control school, Edited by RON Baker, Published by Petroleum Extension Service Division of Continuing Education, The University Of Texas at Austin 1992. 4-66 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 5. WELL RECOMPLETION 5. WELL RECOMPLETION Contents EXECUTIVE SUMMARY ........................................................................................................................ 5-1 5. WELL RECOMPLETION ...................................................................................................................... 5-3 5.1 Introduction ............................................................................................................................. 5-3 5.1.1 Factors Influencing Well Recompletion ............................................................................ 5-3 5.2 Well Recompletion Technology Architecture .......................................................................... 5-4 5.2.1 Recompletion Type Selection ........................................................................................... 5-4 5.2.2 Openhole Recompletion ................................................................................................... 5-4 5.2.3 Uncemented, Slotted Liner Re-completion ...................................................................... 5-5 5.2.4 Perforated Re-completions .............................................................................................. 5-5 5.3 Well Recompletion Modes And Techniques ............................................................................ 5-5 5.3.1 Single String/Single Zone Initial Completion .................................................................... 5-6 5.3.2 Single String/Multi Zone Initial Completion ..................................................................... 5-7 5.3.3 Specialized Solution to Recomplete Well ......................................................................... 5-7 5.4 Downhole Equipment for Well Recompletion ......................................................................... 5-7 5.4.1 Production Casing/liner .................................................................................................... 5-7 5.4.2 Tubing String (Types, Connections, Inspections, Handling and Running Practices) ......... 5-7 5.4.3 Surface Controlled Subsurface Safety Valves (SCSSSVs).................................................. 5-9 5.4.4 Packers (mechanical, hydraulic, permanent/retrievable, optimum packer type selection) .. .................................................................................................................................... 5-13 5.4.5 Re-entry Guide ................................................................................................................ 5-16 5.4.6 Perforated Pup Joint ....................................................................................................... 5-17 5.4.7 Sliding Sleeve (Sliding Side Door) ................................................................................... 5-18 5.4.8 Flow Couplings ................................................................................................................ 5-19 5.4.9 Blast Joints ...................................................................................................................... 5-20 5.4.10 Expansion Joint ............................................................................................................... 5-20 5.4.11 Chemical injection mandrel ............................................................................................ 5-21 5.4.12 Tubing/packer Movement, Forces and Stress Analysis ................................................. 5-22 5.5 Surface Equipment................................................................................................................. 5-31 5.5.1 Wellhead ......................................................................................................................... 5-32 5.5.2 X-mas tree/Tubing hanger .............................................................................................. 5-32 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 5. WELL RECOMPLETION 5.6 Materials Selection for various well conditions ..................................................................... 5-35 5.6.1 Downhole Equipment Metallurgy Selection ................................................................... 5-35 5.6.2 Elastomers Selection ....................................................................................................... 5-41 5.7 Recompletion Selection Workflow ........................................................................................ 5-43 5.8 Quality Assurance and Safety Requirements ......................................................................... 5-44 Appendix 5 A Casing and Tubing Specifications ............................................................................. 5-46 Appendix 5 B Applied Packers in OMV Petrom Specifications ....................................................... 5-47 Appendix 5 C Typical OMV Petrom HP/HT Gas Well Completions ................................................ 5-53 Appendix 5 D Typical OMV Petrom Gas Well Completions, No GP (PR <100 bar) ........................ 5-54 Appendix 5 E Typical OMV Petrom Gas Well Completions, With GP (PR <100 bar) ..................... 5-55 Appendix 5 F Typical OMV Petrom Gas Well Completions (PR >100 bar) - No GP ........................ 5-56 Appendix 5 G Typical OMV Petrom Gas Well Completions (PR >100 bar) - With GP .................... 5-57 Appendix 5 H Typical OMV Petrom Oil Well Completions w/SRP .................................................. 5-58 Appendix 5 I Typical OMV Petrom Oil Well Completions w/PCP ................................................... 5-59 Appendix 5 J Typical OMV Petrom Oil Well Completions For Heavy Oil HZ Wells (Suplac) ........... 5-60 Appendix 5 K An example of tubing movement, forces and stress calculation ............................. 5-61 List of Figures ...................................................................................................................................... 5-64 List of Tables ....................................................................................................................................... 5-65 References .......................................................................................................................................... 5-66 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 5. WELL RECOMPLETION EXECUTIVE SUMMARY EXECUTIVE SUMMARY: 5. WELL RECOMPLETION No. Strongly Recommended 1. Equalize pressure across the SS, before opening/closing. 2. Equalize pressures across a tubing plug before POOH. Approximately 10 bar of differential pressure is allowable acting upward, to help POOH the plug. 3. Install flow couplings below/above the SCSSSV (API recommendation). 4. Uninstall flow couplings below/above any tubing restriction (nipples, BH chokes) if the installed BH device restricted tubing flow are for more than 10% 5. Have a full set of tubing pup joints available on the well site (2', 4', 6', 8' 10' & 12'). 6. Calculate tubing movement/forces for all expected pressure/temperature changes. Select an appropriate expansion joint length or a LSA length & position to compensate for calculated movements. Make sure that the total packer/tubing force, tubing string wall inner/outer total stress and the first joint below tubing hanger force are less than 80% of the tubing yield strength. 7. Always operate the upper master valve only. Use the lower master valve as a "last resort". 8. Run a Back Pressure Valve (BPV) into tubing hanger whenever nipple down/up BOP or Xmass tree. 9. Use an extended neck tubing hanger for additional seal on all gas wells. 10. Calculate H2S and CO2 partial pressure on all wells suspected to have those gases. That's the first indication of having a sour environment. 11. Select appropriate downhole material for sour service, based on the actual well conditions. 12. H2S pp limit is 0.0035 bar and CO2 pp limit is 0.5 bar. 13. Measure and drift (with an API OD drift) before RIH. 14. 15. Always prepare a detailed downhole equipment schematic of the final completion (with lengths, OD/IDs, thread types, material characteristics). Select all the DH equipment elastomers (packer seal, LSA seals, SS seals, tubing hanger seals), to withstand maximum expected temperature, pressures and all expected chemicals to be used (acids, different inhibitors). http://www.petrom.com 5-1 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 5. WELL RECOMPLETION EXECUTIVE SUMMARY: 5. WELL RECOMPLETION No. Not Recommended at All 1. To set a packer at the casing collar. 2. To operate the lower master valve. 3. To run a TWCV (two way check valve) before nippling down/up BOP or X-mass tree. 4. 5. 6. 5-2 To use packer fluid without appropriate inhibition, in case of tubing/packer completion (corrosion inhibitor, oxygen scavenger and biocide). To install any string (work or final production) that is not measured, tallied and drifted, with an API sized drift. To start workover operation without checking Material Safety Data Sheets (MSDSs) for equipment and products to be used during job operation. http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 5. WELL RECOMPLETION 5. WELL RECOMPLETION 5.1 Introduction The production engineer is responsible for monitoring and ensuring the ongoing safe operation of the well. As such the responsibilities include:- The identification and resolution of problems that will occur with the production system. This area of work is critical to the on going viability of field developments and wells, and can be sub divided into a number of areas namely: 1. Identification of problems and their source - this is normally conducted on the basis of surface information which indicates changes in production characteristics such as rate and pressures. In addition downhole investigations using production logging techniques and transient pressure surveys (flow tests) can also help to identify the location of problems and the reasons for the changes 2. Plan the required corrective action - this requires considerable attention to detail and will necessitate: a) Identifying the equipment, manpower and other capabilities required. b) Identification and assessment of the unknowns/uncertainties. c) Identification and evaluation of the key safety point and mile stones. d) The assessment of the probability technical and economic success. e) To identify the required resources, skills and their supervision. f) The workover phase is the most dangerous in terms of well control and the potential for damage on existing production wells. Attention to detail and careful planning is essential. 5.1.1 Factors Influencing Well Recompletion Once a well has been drilled and completed, it will be utilised to produce from or inject fluid into the formation. Workover is a the term that is commonly used to describe the process anytime the well is entered after it is initially completed. This normally involves a process to stop the well producing hydrocarbons, so that the purpose for which it has been entered may be carried out in a safe and controlled manner. Workover operations are performed after the initial completion to either: • Re-establish commercial production or injection, • Repair a mechanical problem in the well, or • Plug and abandon the well. Workover operations are usually initiated when hydrocarbon production rates decline substantially. Completions and workover operations are alike in that they vary depending on the type of well and the area. They can be as simple as changing out pumps in a rod job, or as complex as a multiple zone recompletion with a three or four-stage stimulation treatment. Sometimes workovers are done to control excessive water or gas production. Undesired water or gas production could be the result of a poor primary cement job or water/gas coning. These types of workovers typically involve a remedial cement job to control the unwanted water/gas production. Another common cause for remedial work is mechanical (tubing/casing) failures. These failures are often the result of erosion or corrosion occurring in the wellbore. http://www.petrom.com 5-3 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 5. WELL RECOMPLETION 5.2 Well Recompletion Technology Architecture 5.2.1 Recompletion Type Selection Recompletion type selection depends on the existing well completion. The existing well completion could be the initial one or the well has already been recompleted once or even several times since it had been initially completed (usual case with OMV Petrom). Figure 5-1 Possible initial or existing equipment in the well to be recompleted 5.2.2 Openhole Recompletion OH re-completion can be done as follows: • RIH an appropriately designed stand alone screen (further SAS) in case of sand production problem (recent OMV Petrom initiative). • RIH an appropriately designed slotted liner (OMV Petrom Suplac heavy oil field). • RIH an appropriately designed slotted liner with several swellable ECPs set in shales. • RIH an uncemented liner with several swellable/inflatable ESPs, set in shales, and sliding sleeves (as frac or production ports) between them for selective or commingled production (311 Lipanescu horizontal open hole section, offshore wells equipped for multi stage fracturing). The selection of ECPs (swellable vs inflatable or hydraulic set packers) depends mainly on the geometrical shape of the open hole. Swellable packers usually can’t swell enough in the open hole sections with increase ID. In those situations, inflatables could be packers of choice. 5-4 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 5. WELL RECOMPLETION 5.2.3 Uncemented, Slotted Liner Re-completion This type of recompletion is typically used in wells with expected sand production problems, but is not the best in many cases. OMV Petrom runs un-cemented, slotted liners as an initial completion method on Suplac, shallow, heavy oil wells, with pretty good success. Slots have been designed based on the reservoir sand sieve analysis, to prevent sand inflow into the wellbore. Workover or recompletion on these wells, in case of the slotted liner damage and formation sand inflow into the wellbore, includes: • POOH sucker rod pump, cleaning out the sand with foam or tubing sand bailer, and re-running the sucker rod pump for further production, or • Eventually RIH an inside slotted liner SAS, after cleaning out the sand from the wellbore, then resuming the sand free production. 5.2.4 Perforated Re-completions This is the most common way of initial well completion in OMV Petrom. Usually a 7” production casing is RIH, cemented and perforated for production. 4 ½” or 5” liner as standard sizes are sometimes RIH as production liners through 7” previously RIH and cemented casing. Both possible liner sizes are typically cemented and perforated for production. Workover or recompletion on these wells can include: • Permanent abandonment of the existing perforated interval and perforating upper in the same layer or into a different layer. • WSO, then re-perforating the upper part of the existing layer and acidizing through new and existing perforations. • Just re-perforating the existing perforations and eventually “extending” perforations up/down in the same layer, or adding perforations in a different layer for a commingled production. 5.3 Well Recompletion Modes And Techniques Well recompletions modes and techniques depend on the existing production casing ID, existing tubing string and other downhole equipment RIH during the initial completion or previously done WO/recompletion. The most common types or initial completion in OMV Petrom for gas wells are: • Single tubing string, packerless completion for gas wells with a low existing reservoir pressure (usually < 100 bar). • Single tubing string/single zone completion, with a packer and TRSCSSSV, for gas wells with higher than 100 bar existing reservoir pressure. • Single tubing string/multi zone completion, with two or more packers and sliding sleeves between them for a separate (some SSs are closed) or fully commingled (all SSs are opened) production. A very low percentage of gas wells have been equipped with plunger lift system for a permanent liquid unloading. http://www.petrom.com 5-5 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 5. WELL RECOMPLETION Very small number of oil wells in OMV Petrom are in natural flow, so the majority of the oil wells are drilled in reservoirs with highly depleted pressures and some kind of ALS is necessary to be installed. There are four major types of ALSs used in OMV Petrom: • Coupled sucker rod reciprocating pumps (majority insert type, minority tubing type), • PCPs RIH on coupled sucker rods, • ESP’s (Petromar) and several of them recently installed onshore, and • Continuous gas lift on the oil fields where the injection gas is available. COROD (continuous rod) has been installed on some wells instead of coupled rods with reciprocated bottom hole pumps. 5.3.1 Single String/Single Zone Initial Completion This the most common downhole equipment RIH during the initial completion on gas wells in OMV Petrom. A sliding sleeve is usually RIH, so it could be opened by an appropriate slickline shifting tool for killing the well, before removing the X-mass tree and installing an appropriate BOP stack (Figure 5-2a). Figure 5-2 a) Typical single string/single zone completion w/SS; b) Typical single string/multi zone completion 5-6 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 5. WELL RECOMPLETION 5.3.2 Single String/Multi Zone Initial Completion This type of well completion is not fully implemented in OMV Petrom for onshore wells, so far, and is shown in Figure 5-2b. There is a recent initiative for introducing a commingled completion on reservoirs/layers where that is possible and efficient. On the other hand, that kind of completion has been fully implemented offshore on gas or oil wells which have been multi stage fractured and put on production out of all fractured d zones simultaneously (see Chapter 11). 5.3.3 Specialized Solution to Recomplete Well Petroleum industry has accepted a general definition of anHP/HT well as any well with existing reservoir pressure equal or higher than 700 bar (10000 psi) and existing reservoir temperature equal or highre than 150 oC (300 oF), combined. OMV Petrom doesn’t apply these criteria and considers even wells as HP/HT, with pressures and temperatures less than 700 bar/150oC (4539 Totea, as an example – reservoir pressure/temperature 480 bar/135oC @ 3400 m). A very small number of HP/HT have been completed in OMV Petrom, so far. A typical completion on those kind of wells consists of a HP/HT permanent packer with a tail pipe (nipple, perforated pup joint, No-Go nipple, mule shoe guide), LSA , premium connection tubing string with a TRSCSSSV (Appendix 5 C Typical OMV Petrom HP/HT Gas Well Completions). Packer fluid on these wells has usually got density lower than density required for killing the well. In the case of an urgent need for a re-completion these wells should be killed with a WO fluid of very high density (bromides or formates), which will have a high impact on the WO cost. Besides, premium connection tubing requests a special attention and handling, especially during disconecting/connecting the tubing joints. The tubing joints must be connected with an optimum torque , by using power tongs with a real time torque control. 5.4 Downhole Equipment for Well Recompletion That includes all the equipment which could be run in hole on the final production tubing string as a final recompletion equipment, from the tubing hanger to the tubing string end. The most important downhole recompletion equipment will be mentioned here, and it’s simply impossible to mention all different downhole equipment existing at the market in this document. 5.4.1 Production Casing/liner In most of the cases, OMV Petrom well are cased with 7” production casing, or 7” production casing and 4 ½” or 5” liner. A slim hole design has been recently introduced for sweet, low pressure, gas wells with less than 100000 Sm3/d of gas production. 5.4.2 Tubing String (Types, Connections, Inspections, Handling and Running Practices) OMV Petrom has introduced tubing standard in 2011 (see Appendix 5 A Casing and Tubing Specifications). According to the adopted tubing standard, following tubing sizes are standard one: 2 3/8”, 2 7/8” and 3 ½” OD, with regular API threads for oil and water injection wells and with Tenaris Blue premium threads for gas wells. Tubing refers to the pipe used to create a flow conduit inside the wellbore, between the reservoir and the wellhead. This flow conduit provides control of the produced fluid and facilitates wellbore servicing operations such as electric wireline, slickline and http://www.petrom.com 5-7 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 5. WELL RECOMPLETION pumping activities. Typically, tubing is run inside a casing string or a liner but tubing can also be cemented in slim hole wells as the production tubing. One or more strings of tubing may be used in a completion and this decision is a function of the number of reservoirs to be produced, whether the fluids will be commingled or produced separately and whether the reservoirs will be produced concurrently or sequentially. The purpose of using tubing in a well is to convey the produced fluids from the producing zone to the surface, or in some cases to convey fluids from the surface to the producing zone. It should continue to do this effectively, safely and economically for the life of the well, so care must be taken in its selection, protection and installation. The tubing must retain the well fluids and keep them out of the annulus to protect the casing from corrosion and well pressure which may be detrimental to future well operations such as workovers. Tubing connections play a vital part in the function of the tubing. There are two types of connection available: • API (external upset EUE and non- upset NU – Figure 5-3), and • Premium connections. API connections are tapered thread connections and rely on thread compound to seal whereas the premium thread has at least one metal-to-metal seal. Premium connections are generally used in gas and high pressure wells. Tubing size and grade selection is governed by several factors: • Anticipated well peak production rate, • Well depth, • Casing sizes, • Wellbore fluid type, • Use of electric wireline and slickline tools and equipment, • Pressures/temperatures during the well life, and • Tubing/annulus differential pressures. To meet various completion designs, there is a wide range of tubing sizes, wall thickness (weights) and materials to provide resistance to tubing forces and differing well environments. The best tubing selection is the cheapest tubing which will withstand the external, internal and longitudinal forces it will be subjected to, and resist all corrosive fluids in the well fluid stream. Tubing in the main, is supplied in accordance with API specifications which have a range of materials to resist most of the potential corrosive well conditions, but, where deeper high pressure sour reservoirs are being developed, the API range is not suitable. To fill this gap in the market, steel suppliers provide propriety grades and different CRA material, for various HP/HT and sour well conditions. For ease of identification, tubing is colour coded to API specification. Some specialist supplier's steels are not covered by the code and provide their own specific codes. In most of the cases the existing tubing string in the well is at the same time a work string during workover operations. That’s specially the case when an API threaded tubing string is in the wellbore and when no fishing operations are expected requiring a higher grade, even thick walled tubing string, for applying higher pull/slack off forces. Higher grade, thick walled tubing strings or even the same OD drill pipes can be used for a complicated workover job if applying of higher pulling/slack off forces or higher torques is expected during the planned workover operations (fishing, milling, etc.). Any string (work or final production) must be measured, tallied and drifted, with an API sized drift, before running in hole. The tubing drift API length is 1066.8 mm (42”), and it’s OD can be calculated by using the Excel spreadsheet similar to one shown in Figure 5-4. 5-8 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION Figure 5-3 a) API EUE and NU tubing collars b) Tenaris Blue premium connection Figure 5-4 An example of a tubing drift OD calculation OMV Petrom casing and tubing standards are shown in Appendix 5 A Casing and Tubing Specifications. 5.4.3 Surface Controlled Subsurface Safety Valves (SCSSSVs) The SCSSSV is a downhole safety device that can shut in a well in an emergency or provide a barrier between the reservoir and the surface. As the name suggests, the valve can be controlled from the surface by hydraulic pressure transmitted from a control panel through stainless steel tubing to the safety valve. The remote operation of this type of valve from the surface can also be integrated with pilots, emergency shutdown (ESD) systems, and surface safety control manifolds. This flexibility of the surface controlled safety valve design is its greatest advantage. In the simplest system an SCSSV is held open by control line pressure supplied by a manifold at the surface, the pressure being maintained by hydraulic pumps controlled by a pressure pilot installed at some strategic point at the wellhead. Damage to the wellhead or flow lines causes a pressure monitor pilot to exhaust pneumatic pressure from a low pressure line which in turn causes a relay to block control pressure to http://www.petrom.com 5-9 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 5. WELL RECOMPLETION a three-way hydraulic controller resulting in hydraulic pressure loss in the SCSSSV control line. When this pressure is lost, the safety valve automatically closes, shutting off all flow from the tubing. There are two main categories of SCSSSVs: • Slickline Retrievable - SRSCSSSV(Figure 5-5a) • Tubing Retrievable - TRSCSSSV (Figure 5-5b) Figure 5-5 a) SRSCSSSV b) TRSCSSSV, flapper closure type Statistics on reliability indicate that TRSCSSSVs with are more reliable than SRSCSSSVs, as well as, the flapper type closure mechanism is more reliable than the ball type one. Both categories are supplied with or without internal equalizing features. The equalizing feature allows the pressure to equalize across the valve so it can be re-opened. Valves without this feature need to be equalized by applying pressure at surface. Mean times to failures are approximately 6 years for SRSCSSSVs compared to 15 years for TRSCSSSVs. TRSCSSSVs are also full bore giving higher flow rates. Therefore, the TRSCSSSV flapper valve is the most reliable of all. OMV Petrom uses only non-equalizing, TRSCSSSVs with flapper type closure mechanism. The equalizing valve has more operating parts and is less reliable than non-equalizing valve, however, with the latter, equalization pressure is often difficult to provide and may be time consuming. 5-10 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION TRSCSSSVs are part of the tubing string and usually are run in hole at 50 to 60 m from surface operate using the same principle as SRCSSSvs except all the components are incorporated in one assembly which is installed in the completion string. Some later models have rod pistons instead of concentric piston designs. They also have both equalizing and non-equalizing versions and versions that enable the insertion of a valve inside the TRSCSSSV, on slickline, when the operating mechanism has failed. If the failure is due to a leaking control line then this contingency measure is ineffective. To enable the installation of the insert valve, the TRSCSSSV needs to be ‘locked open’ or ‘locked out’; however the reduced internal bore may adversely affect production rates. The components required for a TRSCSSSV safety system are: • Hydraulic control line, • Control line tubing joint/over tubing collar protectors, and • Hydraulic control manifold. • TRSCSSSV for insert capability: • SRSCSSSV, • Locking mandrel, • Slickline installation and retrieval tools for the locking mandrel, • Lock-out tool for the TRSCSSSV, • A connection to the surface control panel, for keeping the TRSCSSSV open during the production phase or for closing it, in case of an emergency, • Tubing hanger with a hole in it for the control line, and • Tubing hanger flange with an appropriate passage for connecting surface line to the surface control panel. TRSCSSSVs are run held open using control line pressure or a hold open sleeve or straddle. Leak off tests are performed immediately after TRSCSSSVs are installed. A typical leak off test involves closing the production, kill and swab valves on the Xmas tree and bleeding off the control line pressure to the TRSCSSSV. Tubing pressure is bled off slowly above the valve to zero for a TRSCSSSV and in 100 6.9 bar (100 psi) stages for a SRSCSSSV. The system is closed in again and tubing pressure monitored. If there is a rapid build-up, a major leak is indicated or improper functioning of the valve; in this case the valve should be cycled and the test repeated. After a specified shut-in period the tubing head pressure should be below a maximum allowable pressure as specified by the operator’s leak off criteria although there is an API standard. It is extremely important that pressure data is fully and accurately recorded. After initial installation, leak tests should be carried out periodically; this accomplishes two functions: • Testing the integrity of the seal in the safety valve. • Cycling the valve to prevent 'freezing' in wells where they have been sitting in either the fully open or fully closed position for extended periods of time. Only trained, experienced and authorized personnel should conduct all the above tests on all SCSSSVs. Insert valves are small SRSCSSSVs which can be inserted through a failed tubing retrievable valve to provide continued production, although restricted, until a workover campaign is scheduled. Typical slickline runs include: • RIH to lock out the flapper valve. • RIH with a communication tool and function the communication system to the open position. This provides control line pressure to the valve. http://www.petrom.com 5-11 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 5. WELL RECOMPLETION RIH and set the insert valve. The insert valve straddles the control line port to provide the hydraulic pressure integrity required to function the valve. It’s generally recommended that SCSSSV should be installed in a well which is capable of sustaining natural flow. In most oil and gas operating areas, the installation of SCSSSV is governed by law. Unfortunately, the SCSSSV installation in oil and gas wells is not officially regulated in Romania. SCSSSV installation is mandatory in all offshore wells within OMV Petrom, no matter if they are natural flowing or if they have an ALS installed. SCSSSV control line should be well protected during RIH, i.e. appropriate over tubing collar protectors (Figure 5-6) and tubing body clamps should be used. Figure 5-6 Over tubing collar protector The SCSSSSV maximum fails close depth and maximum surface pressure required for keeping the SCSSSV opened, can be calculated by using an Excel spreadsheet as the one shown in Figure 5-7. Figure 5-7 An example of a SCSSSV maximum fail close depth and required surface SCSSSV opening pressure calculation 5-12 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION 5.4.4 Packers (mechanical, hydraulic, permanent/retrievable, optimum packer type selection) To increase productivity, more wells are being stimulated with acidizing and fracturing treatments. Squeeze cementing operations are being used to abandon one zone for another and to shut off unwanted water. These treating jobs require packers designed for these applications. Enhanced oil recovery projects have also created new requirements for packers. Thermal recovery projects need special designs to avoid damage to tubing strings from extreme temperature changes. Miscible flood projects using carbon dioxide have placed additional demands on metals and rubber compounds. Gravel packing is a method which has been used to Increase production in unconsolidated sands. To be successful, this process requires advance planning and special tools for the proper gravel placement. Each of these procedures has its own unique problems, and special packers have been designed to overcome them. It is important for anyone involved in the planning and execution of workover and completion operations to know that these special packers exist and were designed for these applications. By using the packer tailored for a specific operation, workover and completion operations will run smoothly. Packer specialists are available through equipment companies, and their expertise should be taken advantage of in the proper selection of a packer. It is very important to point out that a packer should never being be set in a casing collar, no matter what packer is RIH, production or service one. Types of production and service packers (including bridge plugs- BPs) are presented in Figure 5-8 and Figure 5-9. Common types of production and service packers used by OMV Petrom are shown in Appendix 5 B Applied Packers in OMV Petrom Specifications. Service, treatment packers are always retrievable (except cement retainers), but production packers could be permanent, permanent/retrievable (like Weatherford “Black Cat” packer, for instance) or retrievable. Production, retrievable packers could be mechanical (compression or tension type) or hydraulic, depending on the way of setting. Hydraulic production packers could be RIH on a tubing string and set by applying pressure on tubing. Tubing string should be plugged at bottom with an appropriate tubing plug set in a nipple, or a kind of pump out plug in order to set that type of packer. These packers could be set on an electric wireline as well. Permanent/retrievable or permanent production packers could be set on tubing or on an electric wireline. Pulling out of hole a permanent/retrievable packer is possible with an appropriate pulling tool, but permanent production packer can be only drilled out. http://www.petrom.com 5-13 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION Figure 5-8 Production packer types 5-14 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION Figure 5-9 Service packers and BPs http://www.petrom.com 5-15 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 5. WELL RECOMPLETION 5.4.5 Re-entry Guide A re-entry guide takes on or two forms (Figure 5-10): • Bell guide, and • Mule shoe. The bell guide has a 45° lead in taper to allow easy re-entry into the tubing of well intervention strings (i.e., electric wireline, slickline or coil tubing). This guide is commonly used in completions where the end of the tubing string does not need to bypass the top of a liner hanger. The mule shoe guide is essentially the same as the bell guide, with the exception of a large 45° shoulder. Should the tubing string land on a liner lip while running the completion in the well, the large 45° shoulder should orientate onto the liner lip and guide the tubing in the liner. Figure 5-10 Mule shoe and bell guide A landing nipple is a short tubular device with an internally machined profile, which can accommodate and secure a locking device called a lock mandrel usually run on a slickline. The landing nipple also provides a pressure seal against the internal bore of the nipple and outer surface of the locking mandrel. Landing nipples are incorporated at various points in the completion string depending on their functional requirement. Common uses for landing nipples are as follows: • Installation points for setting plugs for tubing string pressure testing, setting hydraulic set packers, or isolating zones. • Installation point for SRSCSSSVs. • Installation point for downhole regulator or choke. • Installation point for bottom hole pressure/temperature gauges. A so called “No-Go” nipple has got a small shoulder located within the internal bore of the nipple. The primary reason for a No-Go shoulder is to locate the correct lock mandrel. A secondary function of the shoulder is to prevent electric wireline or slickline tools from falling out of the end of the 5-16 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 2012 5. WELL RECOMPLETION tubing string, if dropped. Only one No-Go landing nipple of the same size can be used in a completion string, the lowermost nipple being the No-Go nipple. More than one No-Go nipple can be incorporated in a completion string, provided that a step down in No-Go shoulder is observed. In highly deviated wells (>70°), it may not be possible to use landing nipples. In those cases, electric wireline/slickline operations (done by using special rollers or tractors), commonly use landing nipples for depth references only. Figure 5-11 Otis type “X” landing and “XN” No-Go landing nipples The plugs (tubing plugs) that can be installed in landing nipples are: • Plug with a shear disc (pump to open), • Plug with an equalizing valve, and • Plug with a non-return valve. The choice of plug depends on the pressure control required and the chances of its retrieval. In most of the cases, OMV Petrom uses Otis type “X” and “XN“ No-Go nipples for standard wall thickness tubing and Otis “R” and “RN” No-Go nipples for heavy wall tubing. 5.4.6 Perforated Pup Joint A perforated pup joint should be incorporated in the completion string as a part of the packer tail pipe, to provide a bypass flow of the formation fluid, if bottom hole pressure/temperature gauges are used for production testing or reservoir monitoring. The design criteria for a perforated pup joint is that the total cross section area of the holes be at least equivalent to the cross section area corresponding to the internal diameter of the tubing string above the packer. In many cases, packer tailpipe is stepped down, and it is one size down from the production tubing string above the packer. http://www.petrom.com 5-17 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 5. WELL RECOMPLETION Figure 5-12 Perforated pup joint 5.4.7 Sliding Sleeve (Sliding Side Door) A SS or SSD (Figure 5-13) allows communication between the tubing string and annulus. It consists of two concentric sleeves, each with slots or holes. The inner sleeve can be moved with an appropriate slickline tool, to align the openings to provide a communication path for the circulation of fluids. SSs are used for the following purposes: • To evacuate the well completion brine from the tubing string with a less dense fluid (usually nitrogen), prior to production. • To circulate an appropriate kill fluid into the well prior a workover job. • As a production devices enabling production from different zones in a single string/multi zone completion. • As a contingency should tubing string/packer tail pipe plugging occur. • As a contingency to equalize pressure across a deep set tubing plug, after pressure integrity testing. • As an alternative flow path should a tubing plug become stuck in a nipple. • As a point for setting a tubing plug, for whatever reason (its recommended to use a SS with a profile close to its top). As with all communication devices, the differential pressure across SSs should be known prior to opening. In some areas, the sealing system between the concentric SS’s sleeves are incompatible with the produced fluids and hence alternative methods of producing tubing to annulus communication is used (e.g., side pocket mandrel - Figure 5-13b, chemical injection mandrel, tubing punching). In case the SS can’t be opened with an appropriate slickline tool, tubing punching is the only option for establishing tubing string/annulus communication. In recent years, so called “non5-18 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION elastomeric” SSs (with metal to metal seals) are offered by service companies, meaning that those SSs can be installed in, for instance, HP/HT wells and can be exposed to different kind of wellbore fluids without any problem. But, the SSs material should be selected properly to fit expected harsh bottom hole conditions. Figure 5-13 a) Sliding Sleeve; b) Side Pocket mandrel 5.4.8 Flow Couplings Flow couplings are used in many completions above and/or below a completion component, where turbulence may exist to prevent loss of tubing string integrity and mechanical strength due to internal erosion directly above and/or below the component. Turbulence may be caused by the internal profile (ID restriction) of the completion component. Flow couplings (Figure 5-14a) are thick walled tubulars (of the sam internal diameter as the tubing string), made of a high grade alloy steel, usually supplied in 3m, 4.5 m or 6 m (10, 15 or 20 ft) lengths. Their use depends on internal erosion criteria obtained from fluid velocity and particle content analysis. API recommended practice suggests the use of flow couplings around a SCSSSV (API RPI4B, 1994). In addition, flow couplings are typically used downstream of landing nipples or circulation devices. A suggested rule of thumb is to http://www.petrom.com 5-19 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 5. WELL RECOMPLETION include flow couplings above and below any downhole device which restricts the flow area by more than 10% of the nominal tubing string ID. Figure 5-14 a) Flow coupling; b) Blast joint 5.4.9 Blast Joints Fluids entering perforations may display a jetting behavior. This fluid-jetting phenomenon may abrade the tubing string at the point of fluid entry, ultimately causing tubing failure. Blast joints are joints of pipe with a wall thickness greater than the tubing. These joints are run in the completion opposite the casing perforations. The blast joint (Figure 5-14b) delays the erosional failure at the point where fluids enter the wellbore and impinge on the tubing string. Blast joints are similar in design to flow couplings. They have the same internal diameter as the tubing, but a larger external diameter. Blast joints are normally available in 6 m or 9 m (20-ft or 30-ft) lengths. They are usually used in single string/multi zone completions, and installed in the vicinity of the perforated intervals isolated with packers. 5.4.10Expansion Joint An expansion joint is used to allow tubing movement while maintaining pressure integrity. An expansion joint consists of two concentric tubes that telescope relative to one another (Figure 5-15). Seal elements on the inner tube isolate annulus pressure and fluids from the tubing string as the expansion joint strokes open and close. An expansion joint allows the completion string to expand or contract freely with changes in downhole pressure and temperature, thereby solving the problems associated with tubing contraction and elongation in producing wells, injection wells, or disposal wells. Typically, an expansion joint is placed in the completion string above the shallowest packer to accommodate tubing movement. An expansion joint may also be placed between packers or near the 5-20 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Workover Best Practices 5. WELL RECOMPLETION surface to facilitate well space out. Standard stroke lengths for travel joints are 0.6 m, 1.2 m, 2,4 m, 3 m, 4,5 m, 6 m and 7.5 m (2, 4, 8, 10, 15, 20, and 25ft). The expansion joint can be shear-pinned fully closed or partially open. The position of the expansion joint when it is run in the hole is a function of the expected tubing movement. For example, if future well operations will introduce both tubing expansion and contraction over time, then the joint can be run partially opened to allow for both types of downhole movement. Expansion joints can rotate freely, or can provide the capability to translate tubing rotation to the packer. A swivel expansion joint offers continuous 360° rotation, but can’t translate this motion downhole. Swivel joints with a clutch are similar to the regular swivel expansion joints except that in the collapsed position (or fully extended position) torque can be transmitted to packers or other equipment located below. Splined expansion joints are used when transmission of torque through the expansion joint is required. Figure 5-15 Expansion joint 5.4.11Chemical injection mandrel A chemical injection mandrel is a part of tubing string enabling continuous chemical injection down a chemical injection line connecting the mandrel with a surface chemical injection pump. The chemical injection line (usually 1/4” or 1/2” OD) comes out of the well through specially drilled hole in tubing hanger and appropriately machined passage through the tubing hanger flange. Some operators put a chemical injection line through one of the casing valves and use a special, high pressure seal, to seal around the chemical injection line inside the casing valve. A typical chemical injection line is shown in Figure 5-16. Chemical injection mandrel usually has one or even two check (back pressure) valves. http://www.petrom.com 5-21 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 5. WELL RECOMPLETION Figure 5-16 Chemical injection mandrel 5.4.12Tubing/packer Movement, Forces and Stress Analysis Changing the tubing pressure, annulus pressure or the well temperature results in either a force on the end of the tubing string or a change in the length of the tubing string. If the tubing is not free to move, forces are generated on the packer and the wellhead. If the tubing is free to move, it will either shorten or elongate. There are five basic effects which can occur if the well conditions change. Each effect can be analyzed separately and then combined with the others to get the total effect. They are: 1. Piston effect, 2. Ballooning, 3. Buckling, 4. Temperature effect, and 5. Applied forces. The piston effect, buckling and ballooning are all a result of pressure changes. The temperature effect and any applied forces are independent of the well pressure. The temperature effect is the most important one and causes the biggest tubing length change (elongation if hot fluid is pumped down tubing string or shrinkage if a cold fluid is pumped down tubing string) if tubing string is free to move. The same temperature effect forces will be created if the tubing string is not free to move (latched to the packer). Each effect is considered individually and then combined with the others to achieve a total effect. The end result could be a force or a length change. The total effect depends on the type of tubing-packer connection. The different types of seal assemblies were considered, where the three possibilities are: 1. Stung Through Tubing (free motion) 2. Located or Landed Tubing (limited motion) 3. Latched Tubing (no motion) If the end result of all the effects acts in a direction in which the packer allows motion, then the tubing length changes are to be determined. If the total effect is in a direction in which the packer does not allow motion, then generated forces are to be calculated. 5-22 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 5. WELL RECOMPLETION When determining the force due to the piston effect, it is pressure change rather than absolute pressure that is important. Accordingly, the initial and final well conditions must be known. The initial conditions are those that existed when the packer was set, or when the seal assembly was stung into the packer. The final conditions are those expected during well servicing or production. If the tubing is not free to move, the piston force can be calculated by the following Equation (5-1) (for pressure changes in kPa): F1 = [∆P (A −A ) − ∆P i (A − A )] [kPa] o p o p 1 i (5-1) 100 If the calculated force value is negative, the force is a tension on the packer (acting upward), and if the calculated force value is positive, the force is a compression on the packer (acting downward). A schematic explaining the piston effect is shown in Figure 5-17. Figure 5-17 Piston effect visualization If the tubing is free to move, the piston length change can be calculated as follows (for pressure change in kPa): ∆L1 = [∆P (A − A )− ∆P (A − Ai ) ]L o p o i p 10 E As t [m] (5-2) Where: Ai = tubing I.D. area (cm2) Ao = tubing O.D. area (cm2) Ap = packer seal bore area (cm2) As = tubing cross-sectional area (cm2) E = modulus of elasticity of steel (207,000 MPa) F1 = force due to piston effect (daN) Lt = length of tubing (m) ΔL1 = length change due to piston effect (cm) ΔPi = change in tubing pressure @ packer TVD (kPa) ΔPo = change in annulus pressure @ packer TVD (kPa) http://www.petrom.com 5-23 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 5. WELL RECOMPLETION Ballooning effect is a result of higher pressure inside the tubing string than outside. The pressure differential creates stresses which try to burst the tubing string. The burst stress causes the tubing to swell as shown in Figure 5-18 -left. As the tubing swells, its length becomes shorter, if free to move. If the tubing is anchored, the swelling generates a tensile force on the packer. If the pressure in the annulus is higher than that in the tubing, the pressure differential creates stresses which tend to collapse the tubing (see Figure 5-18 -right). If free to move, the tubing length will increase as the tubing string collapses. If the tubing is anchored, the stresses in the tubing generate a compressive force on the packer. A lengthening of the tubing string due to collapse stresses is called reverse ballooning. The ballooning effect is directly related to the area which the pressures act on. The outside area of a tubing string is larger than the inside area, so a change in the annulus pressure has a greater effect than a corresponding change in the tubing pressure. Therefore, pressure changes in the tubing and annulus must be treated separately to determine the ballooning effect. Unlike the piston effect, ballooning is not localized but occurs throughout the entire length of the tubing string. Hence, the calculations for ballooning are based on the average pressure change in the tubing and annulus. The average pressure is half the sum of the surface (applied) and bottom hole pressures. Because the bottom hole pressure is the sum of the surface and hydrostatic pressure, a change in the surface pressure has double the effect of changing the fluid gradient. Since both the average annulus and tubing pressures may change during well servicing or production, ballooning and reverse ballooning effects are calculated together. Like the piston effect, ballooning causes either a force or a length change depending on the tubing/packer connection. If the tubing is not free to move, the ballooning force can be calculated as follows (for average pressure changes in kPa): F2 = 0.006 [(∆Poa Ao ) − (∆Pia Ai )] [kPa] (5-3) If the calculated force value is negative, the force is a tension on the packer, acting upwards. If the calculated force value is positive the force is a compression on the packer, acting downward. If the tubing is free to move, the length change caused by ballooning can be calculated with the following formula: ∆L2 = 0.06 Lt R 2 ∆Poa − ∆Pia E R 2 −1 ( ) [cm] (5-4) If the calculated tubing string length change is negative, the tubing string shortens. If the calculated tubing string length change is positive the tubing string elongates, where: Ai = tubing I.D. area (cm2) Ao = tubing O.D. area (cm2) E = modulus of elasticity of steel (207,000 MPa) F2 = ballooning force (daN) Lt = length of tubing (m) ΔL2 = length change due to ballooning (cm) ΔPia = change in average tubing pressure (kPa) ΔPoa = change in average annulus pressure (kPa) R = ratio of tubing O.D. to tubing I.D. = Tbg. O.D./Tbg. I.D. 5-24 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION Figure 5-18 Tbg string ballooning/reverse ballooning The buckling effect is the most unusual and difficult to understand of all the effects. Buckled tubing is caused by two distinct force distributions. A compressive force on the end of the tubing string will cause it to buckle. Buckling is also caused by an uneven pressure distribution across the tubing wall. Buckled tubing is bowed from its usually straight position (see Figure 5-19). If the compressive force is high enough, the tubing will continue to buckle until it contacts the casing wall. After contacting the casing, the tubing will begin to coil inside the casing in the form of a spring or helix (Figure 5-20). So long as the buckling stresses in the tubing remain below the its yield strength, the tubing will return to its original shape once the buckling force is removed. If the bending stresses exceed the tubing’s yield strength, it will remain permanently deformed. There are several important facts about buckling that must be understood. Buckling is most severe at the bottom of the tubing string. There is a point, called the neutral point, above which no buckling occurs (see Figure 5-20). If the buckling is very severe, the neutral point may be above the wellhead, in which case the entire tubing string is buckled. Since a compressive force is necessary, buckling will only shorten the tubing string; buckling cannot cause an increase in length. Buckling due to pressure exerts a negligible force on a packer and is ignored as a force. If the annulus pressure is greater than the tubing pressure, no buckling will occur. Finally, a tubing string can buckle even if the tubing is in tension. The buckling is due to the uneven pressure distribution across the tubing wall. An important consideration with buckling due to applied weight, is the generated friction from the tubing contacting the casing wall. This friction will reduce the weight that reaches the packer. As more weight is slacked-off onto the packer, more tubing will contact the casing wall, increasing the friction. Eventually, the friction becomes great enough to support the excess weight of the tubing string, and no more weight reaches the packer. This effect is covered in more detail later in the chapter. Since the force on a packer due to buckling is negligible, only the tubing length change needs to be found. If the final annulus pressure is greater than the final tubing pressure, there is no buckling due to pressure, i.e., there is no length change due to buckling. http://www.petrom.com 5-25 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION Figure 5-19 a) Straight tbg; b) bowed tbg Figure 5-20 Buckled tubing 5-26 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 5. WELL RECOMPLETION The tubing length change due to buckling can be calculated as follows: ( ) r 2 A p2 (∆Pi − ∆Po )2 ∆L3 = − 8 E I (Ws + Wi − Wo ) [cm] (5-5) The height of the tubing string neutral point above the packer can be calculated by using following formula: n= [ 10 A p Pifinal − Pofinal ] Ws + Wi − Wo [m] (5-6) If the height of the neutral point (n) is longer than the length of the tubing string (Lt), then a correction factor for the length change (ΔL3) due to buckling is applied as follows: L L ∆L'3 = ∆L3 t 2 − t n n [cm] (5-7) The corrected length change (ΔL3’) is always less than the original length change (ΔL3). The terms in above equations are as follows: Ai = tubing I.D. area (cm2) Ao = tubing O.D. area (cm2) Ap = packer seal bore area (cm2) E = modulus of elasticity of steel (207 GPa) I = moment of inertia of tubing (cm4) Lt = length of tubing (m) n = height of neutral point above packer (m) Pifinal = final tubing pressure @ packer TVD (MPa) Pofinal = final annulus pressure @ packer TVD (MPa) ΔL3 = buckling effect length change (cm) ΔL3’ = corrected buckling effect length change (cm) ΔPi = change in tubing pressure @ packer TVD (MPa) ΔPo = change in annulus pressure @ packer TVD (MPa) r = radial clearance between tubing and casing (cm) Wi = linear weight of tubing fluid (daN/m) Wo = linear weight of annulus fluid (daN/m) Ws = linear weight of tubing string (daN/m) Force and length changes due to temperature effect are the only ones which are not caused by pressure changes in the well. Temperature is also the easiest effect to deal with. Simply stated, an object expands when heated and contracts when cooled. Force and length changes are dependent only on the average temperature change in the well and the physical properties of the tubing. When the average temperature of a well increases, (either by injecting hot fluids or by producing hot formation fluid) the tubing will elongate if free to move. If the tubing string is anchored to the packer, the temperature change generates a compressive force on the packer and wellhead. When the average well temperature decreases, (by injecting cool fluids) the tubing string will shorten if free http://www.petrom.com 5-27 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 5. WELL RECOMPLETION to move. If the tubing string is anchored at the packer, decreasing the average well temperature will generate a tensile force on the packer and wellhead. Like the ballooning effect, the temperature effect occurs throughout the entire length of the tubing string. Therefore the average temperature change is used to determine the magnitude of the force and length changes. The average temperature of a well is found as follows: Tavg = Tst + Tbh 2 [ C] o (5-8) Where: Tavg – average well temperature (oC) Tst – surface temperature (oC) Tbh – bottom hole temperature (oC) If the tubing is anchored, the temperature force can be calculated as follows: F4 = 10 E As β ∆T [daN ] (5-9) A negative calculated thermal effect force means a tensile force on the packer, and a positive calculated thermal force means a compression force on packer. If the tubing is free to move, the tubing string length change due to the temperature effect can be calculated using formula: ∆L4 = 100 β ∆T [cm] (5-10) A negative calculated tubing length change means the tubing shortens, and a positive calculated thermal length change means the tubing elongates. The terms in the preceding formulas are defined as: As = tubing wall cross-sectional area (cm2) E = modulus of elasticity for steel = 207,000 MPa F4 = temperature effect force (daN) h = true vertical depth (m) Lt = length of tubing string (m) ΔL4 = length change due to temperature effect (cm) ΔT = change in average tubing initial and final temperature (°C) β = coefficient of thermal expansion for steel = 0.0000124 cm/cm/°C As well as the effects of temperature and pressure, any forces applied at the surface must be considered. Tension may be pulled into the tubing string or tubing weight slacked-off onto the packer. Tubing will stretch according to “Hooke’s Law” if subjected to a tensile force. When under a compressive force, tubing will shorten according to “Hooke’s Law” and the Buckling Effect. Force or length changes from the surface are almost always applied after the tool is set. By carefully monitoring the weight indicator and tubing string, both the force and length changes will be known. However, if one applied effect is known ahead of time, the other is easily found. 5-28 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 5. WELL RECOMPLETION If tension is pulled into the packer, and the tension force is known, the tubing length change could be found by using using Hooke’s Law: ∆Lt = [cm] 10 Ft Lt E As (5-11) If the length of tubing pulled is known, the force due to the tension is found by re-arranging Hooke’s Law and solving for the force: Ft = ∆Lt E As 10 Lt [daN ] (5-12) If a known amount of tubing weight is slacked-off onto the packer, the tubing length change is found from: ∆Ls = 10 Fs Lt r 2 Fs + E As 8 I (Ws + Wi − Wo ) [cm] (5-13) The slack-off force (Fs) is found by watching the weight indicator. The terms in the above formulas are defined as: As = tubing cross-sectional area (cm2) E = modulus of elasticity of steel (207,000 MPa) Fs = slack-off force (daN) Ft = tension force pulled into packer (daN) I = moment of inertia of tubing (cm4) Lt = length of tubing (m) ΔLs = length change due to slack-off (cm) ΔLt = length change due to tension (cm) r = radial clearance between tubing and casing (cm) Wi = linear weight of tubing fluid (daN/m) Wo = linear weight of annulus fluid (daN/m) Ws = linear weight of tubing string (kg/m) The total effect of any pressure and temperature changes after the packer is set is the sum of the individual effects. Like the individual effects, the total effect is either a length change or a force on the packer. If the packer permits movement in the direction of the individual effects, find the sum of the length changes for each individual effect. If the packer does not permit movement in the direction of the individual effects, find the sum of the generated forces. There will either be a force on the packer or change in the length of the tubing. There cannot be a combination of the two. The total force on the packer is the vector sum of the individual forces. One should be very careful when dealing with the directions the forces act in. If the tubing is anchored to the packer, the tubing always exerts a compression or tension on the packer. If the tubing is stung through the packer, the tubing can never exert a force on the packer. If the tubing is landed on the packer, there can only be a compression on the packer. It should be remembered that a positive or downward force is a http://www.petrom.com 5-29 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 5. WELL RECOMPLETION compression. If the total force effect is negative, the tubing will shorten because tension cannot be pulled through a landed hook-up. Finally, the force due to buckling is negligible so it is not considered in the total force effect. The total force on a packer with a tension force applied on packer is: (daN ) Fp = F1 + F2 + F4 + Ft (5-14) The total force on a packer with a slack-off force applied on the packer is: Fp = F1 + F2 + F4 + Fs [daN ] (5-15) The total length change is the vector sum of the length changes due to the individual effects. A positive length change means the tubing elongates and a negative length change means the tubing shortens. If the tubing is anchored to the packer, there cannot be a length change, only a force on the packer. If the tubing is landed on the packer, the tubing can only shorten (negative length change) because the packer will not allow the tubing to move down. If the tubing is stung through the packer, a positive length change indicates the tubing elongates and a negative total length change means the tubing shortens. The total tubing length change with applied tension force is: ∆Ltot = ∆L1 + ∆L2 + ∆L3 + ∆L4 + ∆Lt (daN ) (5-16) (daN ) (5-17) The total tubing length change with a slack-off applied is: ∆Ltot = ∆L1 + ∆L2 + ∆L3 + ∆L4 + ∆Ls The above terms are defined as: Fs = slack-off force (daN) Ft = tension pulled into packer (daN) Fp = total force on packer (daN) F1 = force on packer due to the piston effect (daN) F2 = force on packer due to ballooning (daN) F4 = force on packer due to temperature effects (daN) ΔLs = length change due to slack-off force (cm) ΔLt = length change due to tension pulled into packer (cm) ΔLtot = total length change of tubing string (cm) ΔL1 = length change due to the piston effect (cm) ΔL2 = length change due to ballooning (cm) ΔL3 = length change due to buckling (cm) ΔL4 = length change due to temperature effects (cm) The individual effects may act in different directions. For instance, many applied forces are to counter the effects of temperature and pressure. Subtract effects that act in opposite directions and add ones that act in the same direction. If the equations are used to determine the effects, the signs will indicate which direction the force or length change is in. It is always a good idea to write an arrow beside the force to indicate its direction. When determining the packer to tubing force, pay careful attention to the type of tubing to packer hook-up. If the tubing is free to move, the piston force will affect the top joint tension. If the tubing is 5-30 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 5. WELL RECOMPLETION not free to move, the piston force is absorbed by the packer and does not affect the top joint tension. The end area force on the tubing string is found using: Fa = [(A − A )P ] − [(A − A )P ] [daN ] 100 p o ofinal p o ifinal (5-18) Equation 5-18 is very similar to that used to calculate the piston effect force (Equation 5-1). To determine the piston force, the change in the tubing and annulus pressure are used. When calculating the end area force on the tubing, the final pressure for the condition being analyzed is used. One should be careful not to get the two forces confused. As in previous cases, the sign indicates the direction the forces act. As always, the tubing to packer hook-up is important. If the tubing is stung through the packer, there can be no packer to tubing force. If the tubing, is latched there will always be a tubing to packer force, either tension or compression. Landed tubing will only exert a compressive packer to tubing force, since tension can not be pulled into a landed or located seal assembly. The top joint tension is found using the following formula: Ftj = Wair + Fa − Fp [daN ] (5-19) Where: Ai = tubing inside area (cm2) Ap = packer seal bore or valve area (cm2) Ao = tubing outside area (cm2) Fa = end area force (daN) Ftj = top joint tension force (daN) Fp = tubing piston force (daN) Pofinal = final total annulus pressure @ packer TVD (kPa) Pifinal = final total tubing pressure @ packer TVD (kPa) Wair = tubing string linear weight in air (daN) Tubing packer system should be checked for all possible movements, stresses or forces before running in hole (matrix acidizing, hydraulic fracturing, production, full evacuation, long shut in, …). An example of tubing movement/forces calculation is given in Appendix 5 K An example of tubing movement, forces and stress calculation, by using an appropriate Excel spreadsheet. 5.5 Surface Equipment Surface well equipment includes: • • • Wellhead, consisting of a casing bowl (casing head housing), screwed on the surface casing, then welded around. Two or even more casing heads, depending on the number of casings RIH. The simplest casing designs incorporates three casings: surface casing, intermediate casing and production casing. Tubing hanger flange, with a tubing hanger bowl in its upper part. http://www.petrom.com 5-31 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 5. WELL RECOMPLETION 5.5.1 Wellhead A wellhead should provide following: • • • • • • Each casing string support. Support of the BOP equipment for the next section of hole to be drilled support. Sealing off the various annuli from pressure control purposes. The completion string support. An X-mass tree support. Annulus pressure support. Wellhead usually consists of the casing head housing (casing bowl), and as many casing heads as number of casings RIH. A tubing hanger flange is a kind of connection between the wellhead and the X-mass tree. It has got a tubing hanger bowl, where tubing hanger fits in. An appropriate X-mass tree is usually installed either directly to the top tubing hanger flange or there is an appropriate adaptor flange installed on the top tubing hanger flange as an X-over. A typical wellhead is shown in Figure 5-21. Figure 5-21 A typical wellhead schematic 5.5.2 X-mas tree/Tubing hanger A X-mass tree is an assembly of valves, all with specific functions, used to control flow from the well and to provide well intervention access for well maintenance or reservoir monitoring. The X-mass tree is usually connected directly to the tubing hanger spool that seats on the uppermost casing head spool. In some cases an adaptor flange is necessary to be used between the upper tubing hanger 5-32 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION flange and X-mass tree. A X-mass tree may be composed of collection of valves , or in cases of HP/HT wells or gas wells, constructed from a single block (Figure 5-22). Typically, from bottom to top, an Xmass tree contains the following valves: • Lower master gate valve (manually operated and used as a last resort to shut in the well), • Upper master gate valve (usually hydraulically operated and also used to shut in the well), • Flow wing valve (manually operated to allow the passage of hydrocarbons to the production choke), • Kill wing valve (manually operated to allow entry of kill fluid into the tubing), and • Swab valve (manually operated and used to allow vertical access into the tubing for a well intervention work) Figure 5-22 Typical „solid block” X-mass tree The innermost hanger, the tubing hanger, usually has a profile for locating a Back Pressure Valve (BPV) or Two Way Check Valve (TWCV). These valves perform the same function i.e., sealing off the top of the well below the X-mas tree to allow the tree to be tested or repaired (Figure 5-24). These well containment devices can be run into the tubing hanger with the well under pressure and used as mechanical barriers required before removing a X-mas tree (BPV) or for pressure testing X-mass tree after its final installation when the initial completion, workover or recompletion is done. BPV should be used whenever BOP or X-mass tree is to be nippled down/up and a TWCV is to be used for conducting an X-mass tree pressure test ONLY. These plugs are screwed into a threaded section of the tubing hanger where they seal externally. They are run and pulled using a special lubricator (Polished Rod Lubricator) that contains the wellbore pressure whist the valve is being run or pulled. Different tubing hanger types are shown in Figure 5-23a and a typical tubing hanger flange or a http://www.petrom.com 5-33 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 5. WELL RECOMPLETION tubing head is shown in Figure 5-23b. An extended neck seal tubing hanger is usually used on gas wells and HP/HT wells, providing an additional seal inside the X-mass tree flange (Figure 5-23, top right tbg hanger). Off course, the lower X-mass tree flange should be designed to accommodate that type of tubing hanger. Figure 5-23 a) Different tbg hanger types; A typical THF or tubing head OMV Petrom has currently got a valid contract with Cameron Romania for supplying wellheads and X-mass trees. Figure 5-24 BPV and TWCV valve schematic 5-34 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION Figure 5-25 A typical flanged type X-mass tree 5.6 Materials Selection for various well conditions It is very important to appropriately select the downhole and surface (wellhead and X-mass tree) equipment material (metal and elastomer/sealing material). Basically, there are two types of downhole and surface equipment: sweet service and sour service equipment. Majority of OMV Petrom gas and oil wells are sweet wells, but some gas wells drilled in Turburea Bibesti area, Mamu area and a recently drilled exploration well 20 Adjud contain H2S and CO2. 5.6.1 Downhole Equipment Metallurgy Selection OMV Petrom has got three areas in which produced reservoir hydrocarbons contain H2S and CO2. Those areas are: • Turburea Bibesti (H2S content of up to 5%, CO2 content up to 1%), • Mamu (H2S content of up to 10 ppm, CO2 content up to ?%), and • Adjud, where an exploration well had recently been drilled (H2S content of up to 8%, CO2 content up to 25% - 20 Adjud well has been suspended waiting on purchasing appropriate sour service downhole and surface equipment for re-entering the well). http://www.petrom.com 5-35 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 5. WELL RECOMPLETION Sour service wells require special attention in terms of protecting people and environment while operate them. H2S and CO2 presence in the atmosphere should be permanently monitored during well operations and all the people involved in operations should have appropriate safety training and protective equipment, like personal electronic H2S and CO2 monitor. Well site should be equipped with wind socks, self-containing breathing apparatuses and any other equipment necessary to fully protect people and environment. Maximum allowable H2S concentration is 10 ppm for 8 hours exposure time. If the H2S concentration is higher than that, people on the well site must ware SCBA while working on the well site. Sour service wells need a special attention and all the operation programs (drilling, initial completion, WO, re-completion) should contain appropriate emergency response plans. Populated areas close to those well sites should be notified about the planned operations, and the well sites should have visible signs informing people about the ongoing operations. Downhole and surface (wellhead and X-mass tree) equipment should be made of CRA according to the NACE MR0175 standard. First indicators of a possible sour service environment existence are H2S and CO2 partial pressures. If they are above the limit, the environment is considered as a sour one. Few other parameters should be also taken into account like, chloride content, formation water PH value, reservoir temperature, etc. An example of H2S and CO2 partial pressure calculation by using an Excel spreadsheet is given in Figure 5-26. Figure 5-26 H2S and CO2 partial pressure calculation There is a wide range of metallic materials available for manufacturing well completion equipment. Although there is an increasing trend towards reducing costs by using plastic or ceramic coatings, particularly for water injection wells, metal materials are more reliable and will generally be required for most components. A distinction must be made between material for components (e.g., the SCSSSV) and tubular. This is because the material for tubular is manufactured in rolled pipe. The material for components is manufactured out of a bar stock. Components will require machining and possibly welding. Many of the materials used downhole have limited weld ability, as a result of either heat treatment (quench + temper, precipitation hardening) or cold work to increase the strength. It is 5-36 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION recommended that the relevant specialist is contacted before undertaking any welding of these materials or where the manufacture of downhole components involves welding. The proper selection of material considering the real conditions in well, company police and regulation is team work with service or material manufacturer company, as shown in Figure 5-27. A simplified approach to material selection is to examine the partial pressure of H2S and CO2 and pick the metallurgy accordingly. Figure 5-27 General workflow for selecting metallic materials CO2 corrosion, often termed as sweet corrosion, results from the reaction of steel with carbonic acid. Carbonic acid is the dissolution product of CO2 into water, which lowers the pH. While CO2 is not readily dissolved in water (and thus the resulting pH not strongly acidic), some metallic surfaces are believed to catalyze the dissolution of CO2 in water, such that corrosion proceeds faster than is indicated by a simple pH measurement. Chromium content is the most significant variable influencing sweet gas corrosion among alloys, as shown in Table 5-1 and in Figure 5-28. Table 5-1 CO2 corrosion rate for different materials http://www.petrom.com 5-37 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 5. WELL RECOMPLETION Figure 5-28 CO2 corrosion rate for different materials The primary factors affecting CO2 corrosion are: partial pressure, temperature and chloride content. Considering CO2 partial pressure (working pressure x mol% of CO2) as the key criteria, the following rules can be applied to identify the possibility of corrosion (sweet corrosion): If [Pp (CO2) > 2 bar (30 psi)] then corrosion is most likely If [Pp (CO2) is between 0.5 bar (7 psi) and 2 bar (30 psi)] then corrosion is possible If [Pp (CO2) < 0.5 bar (7 psi)] then there are not conditions for corrosion. Knowing temperature and applying model developed by company Shell (De Waard and Milliams) the corrosion rate equation is given as: log (Vcor) = 5.8 - 1710/T + 0.67 log (pCO2) (5-20) Where: Vcor = corrosion rate in mm/yr T = operating temperature in °K pCO2 = CO2 partial pressure in bar Criteria for corrosion rate evaluation and quick look about potential problem in wells in respect to corrosion rate are shown in Table 5-2. Table 5-2 CO2 corrosion rate evaluation 5-38 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION Chromium content is the most significant variable influencing sweet gas corrosion among alloys. Data illustrating the trend is presented in Table 5-1 where corrosion rates are shown for a matrix of three CO2 partial pressures, three chloride levels and two temperatures. The NACE MR 0175 standard splits the sour service severity into three regions as shown in Figure 5-29. The regions are defined as: Region 0 [H2S partial pressure 0.035 bar (0.05 psia)]. This was, and still is, considered to be non-sour. Care is still required with very high-strength steels (above 140 ksi); they can crack even in the absence of H2S. Region 1 is of low partial pressure and relatively high pH, and is therefore considered mildly sour. Proprietary-grade sour service low-alloys are suitable up to 110 ksi under certain conditions (e.g., maximum HRC 30). Region 2 is considered moderately sour and covers some proprietary low-alloys up to 27 HRC. Region 3 is highly sour, but includes API L80 and C90 pipe under certain conditions as well as some proprietary metals. Figure 5-29 NACE MR 0175 Sour service region definitions If H2S is present in fluid stream then it could be the additional accelerating factor of corrosion (sour corrosion). The aggressiveness of H2S depends on its partial pressure, also and the following rules should be used: If [Pp (H2S) > 0.001 bar (0.015 psi)] then corrosion is most likely If [Pp (H2S) is between 0.0001 bar (0.0015 psi) and 0.001 bar (0.015psi)] then corrosion is possible If [Pp (H2S) < 0.0001 bars (0.0015 psi)] then there are no conditions for corrosion. According to NACE MR 0175, if partial pressure of H2S is greater than 0.0034 bars (0.05 psi) then Sulfide Stress Cracking corrosion (SSC) is most likely. Figure 5-30 and Figure 5-31 are practical guidance (Material Selection First Pass Tool - MSFPT) developed for selecting the proper material as a function of H2S and CO2 partial pressures. http://www.petrom.com 5-39 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION Figure 5-30 Metallurgy selection guidance (MSFPT) Figure 5-31 Partial pressure approach for metallurgy selection 5-40 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 2012 5. WELL RECOMPLETION 5.6.2 Elastomers Selection Various types of elastomers/seals are used as parts of downhole equipment. Elastomers are used in most completion equipment where a resilient seal is required. Plastics and metal-to-metal seals are used with closer tolerance seals and to help support elastomers. Elastomers are affected by temperature (both high and low temperatures) and specific chemicals which may soften, harden or swell the elastomer. The elastomer should be selected based on continuous service (e.g. hydrogen sulphide in production fluids) and occasional exposure, for example acids, inhibitors and methanol. The selection process should also account for the volume of elastomer used; some elastomers are difficult or impossible to manufacture into large elastomer sections such ones required for a packer element. Considering downhole conditions and type of application a decision tree has been developed for elastomer selection respecting the recommendations of the leading manufacturing companies end suppliers (Figure 5-32 and Table 5-3) Table 5-3 Common oilfield elastomers and application conditions Compound (1) Nitrile (6) Fluoro -Carbon (6) Aflas (4,6) Chemraz (3) EPDM (7) Kalrez (3) Service Temperature 320 to 2750F 320 to 4000F 1000 to 4000F 400 to 4000F 400 to 5500F 1000 to 4000F F ( 0C) (00 to 1350C) (00 to 2040C) (380 to 2040C) (40 to 2040C) (400 to 2880C) (380 to 2040C) Pressure (2) 10000 9000 8000 6000 3000 6000 psi (MPa) (69) (62.1) (55.2) (41.4) (20.7) (41.4) 0 Environments H2S NR A A A NR A CO2 A B B A NR B CH4 (Methane) Hydrocarbons (Sweet Crude) Xylene B A A A NR B A A A A NR A NR A B A NR A Alcohols Zinc Bromide A NR C A B A A A B NT A A Inhibitors B(5) NR A A NT B Salt Water A A A A A A Steam NR NT B B A B Diesel B A B A NR A Hydrochloric Acid (HCl) NR A A A NR A A : Satisfactory; B: Little or No Effects; C: Swells; NR: Not Recommended; NT: Not Tested (1) These materials are mainly used as O - rings. Note: (2) All pressure tests were done using 6 mil (0.006 - in) gaps; larger radial gaps will reduce pressure rating. (3) Back - up rings must be used above 2500F (121.10C) and 4000 psi (27.6 MPa). (4) Back - up rings must be used above 3500F (176.70C) and 5000 psi (34.5 MPa). (5) Water - soluble inhibitors only. (6) Good for O -rings, packer elements and model seals. (7) For packer element application - EPDM compound - y267. http://www.petrom.com 5-41 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION Figure 5-32 Elastomer Selection Decision Tree 5-42 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION 5.7 Recompletion Selection Workflow A typical, most common re-completion workflow in OMV Petrom is shown in Figure 5-33. It incorporates three major well groups: gas wells, oil wells and water injection wells (for reservoir pressure support and water disposal). Figure 5-33Typical re-completion work flow in OMV Petrom http://www.petrom.com 5-43 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 5. WELL RECOMPLETION 5.8 Quality Assurance and Safety Requirements Quality Control The general industry WO/re-completion rules/practices implemented in OMV Petrom can be summarized as follows: • All the downhole equipment peaces should be always measured, tallied and drifted before any run in hole. • A detailed downhole schematic with all downhole equipment ID, OD, lengths, material type, weight, should be prepared for all the BHA RIH, • All the downhole equipment pieces should be checked upon arrival on the well site and before running in the hole. Especially, ODs should be checked to ensure unrestricted RIH. • A visual inspection of downhole equipment pulled out of hole, should be done and an appropriate report with photos should be put together. The status of the downhole equipment pulled out of the hole should be reported on the daily report. • All downhole equipment which needs to be replaced, should be sent to appropriate suppliers with associated visual inspection reports and requests for re-dressing or a full replacement with a new equipment piece. • Tubing hanger pulled out of hole should be thoroughly inspected by the WH & X-mass tree supplier as well, and seals on it should be replaced if necessary • Tubing hanger flange (7 1/16” OD in most of the cases) gasket should be thoroughly inspected by the WH & X-mass tree supplier and replaced if necessary. • All service companies supplying materials will review Material Safety Data Sheets (MSDS’s) at the meeting for all products supplied and ensure these MSDS’s are available for worker’s examination on location in compliance with regulations Well control and eventual H2S and CO2 content in reservoir hydrocarbons should be of the main concerns while doing WO/re-completion (see Chapter 4-Well Control). Safety requirements All workers on the well site should wear protective equipment all the time (hard hats, hard toe boots, non flammable coveralls, safety gloves, safety glasses and ear buds in case of excessive noise. Safety meetings are to be held with all service company personnel prior to the start of each shift or job. Wellsite supervisor must notify contractors of known hazards of which contractor(s) may be unaware. Wellsite supervisor must ensure that workers are aware of their responsibilities and duties under OH&S regulations and workers comply with regulations. All applicable regulations, including, but not limited OMV Petrom OH&S regulations, are to be strictly adhered. The list of HSE regulations (Government and OMV Petrom) is shown in Table 5-4. 5-44 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 5. WELL RECOMPLETION Table 5-4 HSE Documents and Standards HSE Documents and Standards 1. Law No. 319/2006 - Law on Safety and Health at Work 2. Government Decision No. 1425/2006 - rules for the application of safety and health law 3. GD 1408/2008 – Classification, packaging and labeling of hazardous substances 4. 5. 6. 7. Government Decision no. 1146 / 2006 - Minimum safety and health for use in work equipment by workers at work H.G. No. 493/12.04.2006 on the minimum safety requirements regarding the exposure of workers to risks arising from noise. Government Decision No. 1050 of August 9, 2006 on minimum requirements for ensuring safety and health of workers in mining and drilling Government Decision No. 1049 of August 9, 2006 on minimum requirements for ensuring safety and health of workers in surface or underground mining 8. Law No. 265/29.06.2006 for approving the Emergency Ordinance 9. Government No. 195/2005 on environmental protection. 10. Emergency Ordinance No. 78 of 16 June 2000 on waste 11. Regulation to prevent the rash drilling, commissioning and operation of production of oil and gas wells - ed. 1982. 12. WO-RO-06-14-00 –“Inspection and maintenance of hoisting equipment” 13. Technical book for well interventions and workover, OMV Petrom, 2011 14. EP-HSEQ-RO-06-21-00 – “Storage, Handling and Transportation of Hazardous Substances and Materials” 15. Standard Petrom EP – Standard for risk assessment at work HSEQ-RO-06-01” 16. Standard Petrom EP - 'HSEQ management of emergency situations - 10-01 -00 17. EP Petrom Policy - ,,Stop working; Individual responsibility HSEQ –RO –01 –02 -00 18. Standard Petrom EP - 'Plan to prevent and combat accidental pollution HSEQ-EN-06 -14-00 " 19. Petrom EP Standard – HSEQ and contractors HSEQ – RO -07 – 01 – 00 Edition in force 20. Standard Petrom EP - system of work permits - HSEQ - EN - 06 - 03 edition in force 21. Standard Petrom EP - Incident reporting HSEQ-RO - 09 - 01 edition in force 22. Standard Petrom EP - Hazard Identification and management of HSEQ-RO - 04 - 06 edition in force 23. Standard Petrom EP - Personal protective equipment HSEQ-RO - 06 - 11 edition in force 24. Work Instruction Petrom EP - Alcohol test HSEQ-RO - 04 - 07 edition in force in Petrom http://www.petrom.com 5-45 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 5. WELL RECOMPLETION Appendix 5 A Casing and Tubing Specifications OCTG Type OD (inch) PPF Steel grade Casing Casing Casing Casing Casing Casing Casing Casing Casing Casing Casing Casing Casing Casing Casing Casing 20 20 13 3/8 13 3/8 13 3/8 9 5/8 9 5/8 9 5/8 9 5/8 9 5/8 9 5/8 7 7 7 7 4 1/2 133 106.5 68 68 54.5 47 47 47 47 40 36 29 29 23 23 13.5 K55 K55 K55 L80 K55 P110 P110 L80 L80 L80 K55 L80 L80 L80 K55 L80 Tubing Tubing Tubing Tubing Tubing Tubing Tubing Tubing Tubing Tubing Tubing Tubing Tubing 3 1/2 3 1/2 3 1/2 3 1/2 3 1/2 2 7/8 2 7/8 2 7/8 2 7/8 2 3/8 2 3/8 2 3/8 2 3/8 12.95 12.7 9.3 9.3 9.2 8.7 8.6 6.5 6.5 5.95 5.8 4.7 4.7 L80 L80 J55 L80 L80 L80 L80 J55 L80 L80 L80 J55 L80 OCTG Type OD (inch) PPF Steel grade Casing Casing 7 5 32 18 L80 L80 5-46 Standard items DDP Petrom's DDP Petrom's Well RCT VMI Service Pipeyard Site VMI Service END (months) [USD/m] (4) [USD/m] (1) [USD/m] (3) TSH ER 4 n/a 659.29 22.78 TSH ER 4 n/a 527.93 18.24 TSH ER 4 n/a 187.28 11.65 TSH ER 4 n/a 196.06 11.65 TSH ER 4 n/a 150.10 9.34 TSH Blue 5 n/a 172.28 8.05 Buttress 4 n/a 136.58 8.05 TSH Blue 5 n/a 159.64 8.05 Buttress 4 n/a 129.44 8.05 Buttress 4 n/a 110.17 6.85 Buttress 4 n/a 94.50 6.17 TSH Blue 5 n/a 101.90 4.97 Buttress 4 n/a 76.88 4.97 Buttress 4 n/a 60.97 3.94 Buttress 4 n/a 58.11 3.94 TSH Blue 3 n/a 49.34 2.31 EUE 2 36.97 ISH Blue 2.5 51.07 EUE 2 25.37 EUE 2 26.55 TSH Blue 2.5 37.00 EUE 2 26.08 TSH Blue 2.5 36.32 EUE 2 18.62 EUE 2 19.48 EUE 2 20.38 TSH Blue 2.5 27.99 EUE 2 15.39 EUE 2 16.10 Non - standard items DDP Petrom's RCT Pipeyard END (months) [USD/m] (1) TSH 523 5 n/a TSH 513 6 n/a http://www.petrom.com 39.56 53.76 27.22 28.41 38.95 27.83 38.16 19.92 20.79 21.60 29.26 16.35 17.07 DDP Tenaris Werehouse [USD/m] (2) 127.50 76.44 2.22 2.18 1.59 1.59 1.58 1.49 1.47 1.11 1.11 1.02 0.99 0.81 0.81 VMI Service [USD/m] (4) 5.48 3.08 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION Appendix 5 B Applied Packers in OMV Petrom Specifications Figure 5-34 Schlumberger Possi Test Packer http://www.petrom.com 5-47 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION Figure 5-35 Baker "Lock Set" Packer 5-48 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION Figure 5-36 Baker "R-3" Packer http://www.petrom.com 5-49 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION Figure 5-37 Baker "FH" Packer 5-50 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION Figure 5-38 Weatherford "Black Cat " Permanent/Retrievable Packer http://www.petrom.com 5-51 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION Figure 5-39 Baker "F-1" Permanent Packer 5-52 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION Appendix 5 C Typical OMV Petrom HP/HT Gas Well Completions Figure 5-40 Typical OMV Petrom HP/HT Gas Well Completion http://www.petrom.com 5-53 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 5. WELL RECOMPLETION Appendix 5 D Typical OMV Petrom Gas Well Completions, No GP (PR <100 bar) Figure 5-41 Typical OMV Petrom Gas well Completion, No GP (PR<100 Bar) 5-54 http://www.petrom.com 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION Appendix 5 E Typical OMV Petrom Gas Well Completions, With GP (PR <100 bar) Figure 5-42 Typical OMV Petrom Gas Well Completions, With GP (PR <100 bar) http://www.petrom.com 5-55 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 5. WELL RECOMPLETION Appendix 5 F Typical OMV Petrom Gas Well Completions (PR >100 bar) No GP Figure 5-43 Typical OMV Petrom Gas Well Completions (PR >100 bar) - No GP 5-56 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION Appendix 5 G Typical OMV Petrom Gas Well Completions (PR >100 bar) - With GP Figure 5-44 Typical OMV Petrom Gas Well Completions (PR >100 bar) - With GP http://www.petrom.com 5-57 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 5. WELL RECOMPLETION Appendix 5 H Typical OMV Petrom Oil Well Completions w/SRP Figure 5-45 Typical OMV Petrom Oil Well Completions w/SRP 5-58 http://www.petrom.com 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION Appendix 5 I Typical OMV Petrom Oil Well Completions w/PCP Figure 5-46 Typical OMV Petrom Oil Well Completions w/PCP http://www.petrom.com 5-59 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 5. WELL RECOMPLETION Appendix 5 J Typical OMV Petrom Oil Well Completions For Heavy Oil HZ Wells (Suplac) Figure 5-47 Typical OMV Petrom Oil Well Completions For Heavy Oil HZ Wells (Suplac) 5-60 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION Appendix 5 K An example of tubing movement, forces and stress calculation Table 5-5 An example of tubing movement, forces and stress calculation http://www.petrom.com 5-61 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION Table 5-6 An example of tubing movement, forces and stress calculation (Continuation) 5-62 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 5. WELL RECOMPLETION Table 5-7 An example of tubing movement, forces and stress calculation (continuation) http://www.petrom.com 5-63 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 5. WELL RECOMPLETION List of Figures Figure 5-1 Possible initial or existing equipment in the well to be recompleted, Figure 5-2 a) Typical single string/single zone completion w/SS; b) Typical single string/multi zone completion, Figure 5-3 a) API EUE and NU tubing collars b) Tenaris Blue premium connection, Figure 5-4 An example of a tubing drift OD calculation Figure 5-5 a) SRSCSSSV b) TRSCSSSV, flapper closure type, Figure 5-6 Over tubing collar protector, Figure 5-7 An example of a SCSSSV maximum fail close depth and required surface SCSSSV opening pressure calculation, Figure 5-8 Production packer types, Figure 5-9 Service packers and BPs, Figure 5-10 Mule shoe and bell guide, Figure 5-11 Otis type “X” landing and “XN” No-Go landing nipples, Figure 5-12 Perforated pup joint, Figure 5-13 a) Sliding Sleeve; b) Side Pocket mandrel, Figure 5-14 a) Flow coupling; b) Blast joint, Figure 5-15 Expansion joint, Figure 5-16 Chemical injection mandrel, Figure 5-17 Piston effect visualization, Figure 5-18 Tbg string ballooning/reverse ballooning, Figure 5-19 a) Straight tbg; b) bowed tbg, Figure 5-20 Buckled tubing, Figure 5-21 A typical wellhead schematic, Figure 5-22 Typical „solid block” X-mass tree, Figure 5-23 a) Different tbg hanger types; A typical THF or tubing head, Figure 5-24 BPV and TWCV valve schematic, Figure 5-25 A typical flanged type X-mass tree, Figure 5-26 H2S and CO2 partial pressure calculation, Figure 5-27 General workflow for selecting metallic materials, Figure 5-28 CO2 corrosion rate for different materials, 5-64 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 5. WELL RECOMPLETION Figure 5-29 NACE MR 0175 Sour service region definitions, Figure 5-30 Metallurgy selection guidance (MSFPT), Figure 5-31 Partial pressure approach for metallurgy selection, Figure 5-32 Elastomer Selection Decision Tree, Figure 5-33Typical re-completion work flow in OMV Petrom, Figure 5-34 Schlumberger Possi Test Packer, Figure 5-35 Baker "Lock Set" Packer, Figure 5-36 Baker "R-3" Packer, Figure 5-37 Baker "FH" Packer, Figure 5-38 Weatherford "Black Cat " Permanent/Retrievable Packer, Figure 5-39 Baker "F-1" Permanent Packer, Figure 5-40 Typical OMV Petrom HP/HT Gas Well Completion, Figure 5-41 Typical OMV Petrom Gas well Completion, No GP (PR<100 Bar), Figure 5-42 Typical OMV Petrom Gas Well Completions, With GP (PR <100 bar), Figure 5-43 Typical OMV Petrom Gas Well Completions (PR >100 bar) - No GP, Figure 5-44 Typical OMV Petrom Gas Well Completions (PR >100 bar) - With GP, Figure 5-45 Typical OMV Petrom Oil Well Completions w/SRP, Figure 5-46 Typical OMV Petrom Oil Well Completions w/PCP, and Figure 5-47 Typical OMV Petrom Oil Well Completions For Heavy Oil HZ Wells (Suplac). List of Tables Table 5-1 CO2 corrosion rate for different materials, Table 5-2 CO2 corrosion rate evaluation, Table 5-3 Common oilfield elastomers and application conditions, Table 5-4 HSE Documents and Standards, Table 5-5 An example of tubing movement, forces and stress calculation, Table 5-6 An example of tubing movement, forces and stress calculation (Continuation), Table 5-7 An example of tubing movement, forces and stress calculation (continuation). http://www.petrom.com 5-65 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 5. WELL RECOMPLETION References 1. Hammerlindl, D. T. 1977 . Movement, forces and stress associated with combination tubing strings seal ed with packers. JPT ( Februa ry) . 2. Lubinski, A., W. S. Althouse, and T . L. Logan. 1962. Helical buckling of tubing sealed in packers, JPT (June) . 3. Lubinski, A., and K. A. Blenkarn. 1962 . Buckling of tubing in pumping wells, i t s effects and means for controlling it. SPE Reprint Series, No. 12. 4. National Association of Corrosion Engineers (NACE). 1977. Materials requirement for sulphide stress cracking resistant metallic materials for oil field equipment , MR-01- 75. 5. Baker Oil Tool Division, Packer Calculations Handbook (1971). 6. Graves W. Gordon, Ott K. William & Woods D. Joe, Mature Oil & Gas Wells DH Remediation Handbook - World Oil 2004 7. Ott K. William & Woods D. Joe, Modern Sandface Completion Practices Handbook - World Oil 2003 8. Sherwood Joe , Packer Completions Techniques, Dresser Industries INc. 1978 9. Renpu Wan, Advanced Well Completion Engineering, Third Edition, Elsevier Inc., 2011 10. Economides J. Michael, Watters T. Larry & Dunn-Norman Shari, Petroleum Well Construction, John Willey & Sons, 1998 11. Bellarby Jonathan, Well Completion Design, Elsevier Inc. 2009 12. Allen O. Thomas & Roberts P. Alan, Production Operations 1, Fourth Edition-Fifth Printing, March 2006 13. Allen O. Thomas & Roberts P. Alan, Production Operations 2, Fourth Edition, Fifth Printing March 2006 14. Patton L. Douglas & A. Abbot A. William, Well Completions And Workovers - The System Approach - 1985 15. Gabolde Gilles & Nguyen Jean-Paul, Editions Technip, Drilling Data Handbook, Eight Edition, Paris, 2006 16. Perrin Dennis, Well Completion And Servicing, Editions Technip, Paris 1999 5-66 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 6. PERFORATING 6. PERFORATING Contents EXECUTIVE SUMMARY ......................................................................................................................... 6-1 6. PERFORATING .................................................................................................................................. 6-3 6.1 Introduction ............................................................................................................................. 6-3 6.1.1 The Fundamentals of Perforating ...................................................................................... 6-3 6.2 Perforating Techniques .......................................................................................................... 6-12 6.2.1 Factors that should be considered for an optimum perforating job ............................. 6-12 6.2.2 Perforation Technique Selection ................................................................................... 6-15 6.3 Perforating Technique Types ................................................................................................. 6-18 6.3.1 Special Perforating Techniques ..................................................................................... 6-20 6.3.2 Overview of Applied Perforating Techniques In OMV Petrom ..................................... 6-21 6.3.3 Different Gun Types And Performances ........................................................................ 6-21 6.4 Surface Equipment................................................................................................................. 6-24 6.4.1 Wellhead Pressure Control Assembly ........................................................................... 6-24 6.5 Materials for Perforating ....................................................................................................... 6-26 6.5.1 Explosives....................................................................................................................... 6-27 6.5.2 Perforating Fluids........................................................................................................... 6-28 6.6 OMV Petrom Current Perforating Best Practice Workflow ................................................... 6-29 6.7 Quality Assurance and Perforating Safety Requirements ..................................................... 6-32 6.7.1 Perforating Quality Control ........................................................................................... 6-32 Appendix 6-A Geodynamics Guns Specification Details ................................................................ 6-35 Appendix 6-B Perforating Skin Calculation .................................................................................... 6-38 List of Figures ..................................................................................................................................... 6-40 List of Tables ....................................................................................................................................... 6-41 References .......................................................................................................................................... 6-42 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 6. PERFORATING EXECUTIVE SUMMARY EXECUTIVE SUMMARY: 6. PERFORATING No. 1. 2. 3. 4. 5. Strongly Recommended Perforate underbalanced (differential pressure acts towards the wellbore) with clean, filtered brine (down to 2 microns) in the casing. Carbonate formations may represent an exception if the perforating fluid is acid. It is possible to obtain high well productivities by perforating in HCI or Acetic Acid with a small differential pressure into the formation. Use RDX charges for bottom-hole temperature up to 100oC, and use HMX charges for bottom hole temperatures above 100oC. High temperature charges should be avoided unless absolutely necessary. RIH previously fired, non-charged swollen hollow carrier of a through tubing gun; check if it will pass all tubing restrictions, before RIH charged through tubing gun for a through tubing perforating job. (typically it’s about 6% of the gun OD). Create an optimum drawdown before an underbalanced perforating job as per recommendations in Table 6-2. 6. Use 45° to 90° phased gun which provides the nearest approximation to radial flow. 7. Do perforating simulation runs with appropriate perforating simulation software to pick up the optimum gun for the perforating job. 8. Always use the main and a redundant firing head with a TCP gun. 9. Always use a grease injection head for HP/HT wells and sour wells. 10. 11. 12. Perform pressure test electric wireline BOP /lubricator on maximum expected wellhead pressure. Clean perforations after perforating for sand control, by using perforation washing tool or perforation surging tool. If intervals are vertical and short (less than 15 m/50 ft), and perforated in balanced or overbalanced conditions, electric wireline perforating can usually be performed in several hours and may be the most efficient method. Otherwise, a TCP gun system should be considered as the best option, taking into account an economic evaluation of both options as well. http://www.petrom.com 6-1 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 6. PERFORATING EXECUTIVE SUMMARY: 6. PERFORATING No. Not Recommended at All 1. To perforate overbalanced (differential pressure acts towards the formation to be perforated) with mud or solids-containing-fluid in the casing. 2. To use aluminum charges, when perforating in HCl acid. 3. To perforate with less than 12 spm (4 spf). 4. Any perforating work during bed weather conditions (storms, heavy rain/snow, flood, etc). 5. To do perforating job over night, unless the formation is well known and the light towers makes excellent light. 6. To use high temperature charges unless absolutely necessary. 7. To allow presence of non-essential personnel on the rig floor and keep anyone standing in the line of fire. 8. Make pressure tests the lubricator with gun inside. 6-2 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 6. PERFORATING 6. PERFORATING 6.1 Introduction In the majority of completions, once the reservoir has been drilled, production casing or a liner is run into the well and cemented in place. To provide the communication path between the reservoir and the wellbore, it will be necessary to produce holes through the wall of the casing, the cement sheath and penetrate into the formation. This is accomplished by a technique called perforating. The basic operation requires that a series of explosive charges are lowered into the well either on an electric conductor wireline cable, or on tubing or drillstring. When the charges are located at the required depth, they are detonated to produce a series of perforations through the wall of the casing and the cement sheath. Since the perforations will hopefully provide the only communication between the reservoir and wellbore, it is necessary to design and execute the perforating operation carefully, to provide the required degree of reservoir depletion control and maximise well productivity/injectivity. Initially, the type of charges used in perforating guns were bullets, but with the development of armour penetrating explosives during World War II, shaped charges or jet perforators are now used almost exclusively. There are several advantages of the cased and perforated completion over the open-hole completion: • • • • • • • • Upfront selectivity in production and injection. Ability to shut-off water, gas or sand through relatively simple techniques such as plugs, straddles or cement squeeze treatments. Excellent productivity – assuming well-designed and implemented perforating. Drilling related formation damage can usually be bypassed. Ability to add zones at a later date. It is also possible to reperforate zones plugged by scales and other deposits. Suitable for fracture stimulation, especially where fracture containment or multiple fracturing is required. Reduced sanding potential through perforations being smaller than a wellbore, selective perforating or oriented guns. Ease of application of chemical treatments – especially those treatments requiring diversion such as scale squeezes, acidizing and other chemical dissolvers. Ease of use with smart completions or where isolation packers are used, for example with sliding side doors (SSDs). The main disadvantage is the increased costs, especially with respect to high angles or long intervals. 6.1.1 The Fundamentals of Perforating After an oil, gas or injection well is completed, the wellbore is isolated from the surrounding formation by casing and cement. Establishing fluid communication between the wellbore and formation, for either production or injection, requires some perforating operation. Perforating is the http://www.petrom.com 6-3 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 6. PERFORATING process of creating holes in the casing that pass through the cement sheath and extend some depth into the formation. The formation penetration can range from essentially zero to several inches, depending on the perforator used and the mechanical and physical properties of the materials being penetrated. The holes may be dispersed in an angular pattern around the interior of the wellbore; this dispersion is called phasing. The number of shots per linear unit length (m/foot) can vary, typically ranging from 12 to 24 SPM (or more if a zone is perforated several times); this number is referred to as shot density. The primary objective of the use of the modern perforating gun is to provide effective fluid flow communication between a cased wellbore and a producing reservoir. To achieve that communication, the gun perforator punches a geometrical pattern of perforations (called “carrots”) through the casing and cement sheath and into the producing formation. Perforation tunnel penetration into the formation depends on gun type and size, reservoir physical characteristics, and formation stress conditions. Perforation tunnel penetration into the formation can vary from 0,15m to 0,6 m, and even deeper. Completions can be classified into four general types: open-hole, cased, cemented & perforated (in further text natural), stimulated, and sand control. “Natural” completions can be defined as those wells with sufficient reservoir permeability and formation competence to produce economical hydrocarbon rates without stimulation. With natural completions, effective communication to the undamaged formation becomes critical. The primary perforation factors are depth of penetration, charge phasing, the effective shot density, percentage of the productive interval that is perforated, and degree of underbalance pressure. The perforation diameter is generally unimportant if it is larger than 6.35 mm (0.25 in). Basically, all other completions other than open-hole are cased, cemented and perforated, no matter if any stimulation or inside casing gravel pack is done. Exceptions are completions including running in hole un-cemented slotted liners, liners with external casing packers with production and/or frac ports between them, and stand alone sand screens. In those cases perforating is not a part of the completion. Good contact between the formation and the wellbore is of the extreme importance in cased hole completions. The effectiveness of the communication path through the casing, cement and extending beyond the near wellbore damaged formation is critical for the successful completion and optimum well performance. Perforation tunnels should enhance well productivity in several ways: • • • They should create clear channels through the portion of the formation damaged during the drilling process, and go beyond the damaged zone into the formation. They should provide uniform tunnels for hydraulic fracturing fluids and proppants, and They should make many large uniform holes for sand control (Gravel/Frack Pack) and later hydrocarbon production, through perforation tunnels tightly packed with gravel. Perforating operation can be carried out by devices called guns, a denomination due to the original perforation method that involved the use of perforating bullets shot by short guns (Figure 6-1). The guns have the function of guiding the bullet towards the cased hole so as to perforate it and reach the pay rock, penetrating it in part. The speed reached by the bullets, about 1,000 m/s, is sufficient to 6-4 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 6. PERFORATING perforate the tubing, the cement and the pay rock. This method is not very efficient when used in resilient formations, or when particularly strong casing materials are used. Nowadays, this method is only used when dealing with soft formations, or when it is important to obtain perfectly round holes (when ball sealers are to be used). Figure 6-1 “Bullet” gun perforator Another perforation method uses high-pressure fluid jets containing either liquids or water-sand mixtures. These devices make it possible to create holes or gashes in the casing, and, if necessary, to produce a cut in the casing. The main advantage of this method is the possibility of creating very clean cuts without damaging the formation. The main disadvantage is the slowness of the process, and the elevated costs it involves; it can realistically be used only for carrying out perforations on short intervals. Sand-Jet Perforator (SJP – Figure 6-2) is designed to perforate casing and cement using abrasive-laden slurry and to extend a cavity into the reservoir. The tool can be used independently to jet perforations or combined with a mechanical set packer to perform multiple functions in a single trip. The SJP provides perforations with no skin effect or formation damage; therefore, breakdown pressures for fracture initiation are reduced, leading to more effective stimulation treatments. The SJP does not require explosives and is ideal for perforating operations where well conditions prohibit the use of electric-line-conveyed guns. The tool can be run with jointed pipe or coiled tubing and can be used on new oil and gas wells and in existing zones that require re-perforation where the build-up of sediment caused by flowing oil decreases production. The third perforation method is currently the most widely used, and is called jet perforating. This method consists in using explosive charges often known as jet charges, which are collocated within a support system called gun. The charges have a concave shape which, in the moment of expulsion, promotes the formation of a primary expansion chamber for the gases produced and helps to aim in the chosen direction. Jet perforation systems are composed of a series of elements that form the so called explosive train. These elements are: a detonator that is used to activate the charges, a detonating fuse to connect the detonator to the charges and the charges to each other, and the charges themselves. The explosive train can be brought into the hole in different ways. A wireline http://www.petrom.com 6-5 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 6. PERFORATING system can be used before lowering the completion. Alternatively, coiled tubing or the production string itself can be used, in order to carry out successive operations directly in the well. Figure 6-2 Sand Jet Perforator Once the shaped charge has been placed in a gun (Figure 6-4) and the gun positioned in a well, the detonation begins at time t0 with the initiation of a detonator. This initiates an explosive wave front travelling down the detonating cord at about 7000 m/sec with pressures about 15 to 20 GPa. The detonating cord in close contact with the primer region of the shaped charge detonates the primer, which initiates the main explosive charge. The charge detonation increases in speed and advances spherically until it reaches terminal speed of about 8000 m/sec and pressures of 30 GPa. This occurs just prior to the arrival of the wave front at the apex of the liner. At this point (t1) the case expands radially about the symmetry axis of the charge while the liner is thrust inward. At the point of impact on the axis near the apex of the liner, the pressures increase to more than 100 GPa. From this point the liner parts into two axial streams: a faster, forward-moving stream forming the tip of the jet, and a slow, forward-moving stream forming the tail. The jet tip travels at about 7000 m/sec while the tail travels at about 500 m/sec, forming a velocity gradient responsible for the stretching of the jet required for achieving casing and formation penetration (t2). The amount of the shaped charge explosive is small – typically in the range of 6 to 32 g (0.2–1.1 oz), although smaller charges are available for very small-diameter casing and larger charges can be used for big hole charges. 6-6 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 6. PERFORATING Figure 6-3 Jet charge elements Figure 6-4 Jet perforating sequence Figure 6-5 shows what shape charge geometrical parameters need to be changed in order to increase perforation tunnel penetration length, entrance hole ID or volume. http://www.petrom.com 6-7 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 6. PERFORATING Figure 6-5 Impact of different shape charge geometrical parameters on perforation tunnel penetration length, entrance hole ID, and volume It would be, therefore, expected the following parameters to influence the physical performance of the shaped charge: a) Gun size/explosive charge size The size of the perforating gun will dictate the maximum explosive load which can be accommodated in the charges. In general terms, both the penetration and the diameter of the entrance hole will increase as the gun diameter and hence the size of explosive charge also increases as shown in Figure 6-6. Figure 6-6 Effect of gun size on entrance hole and depth of penetration 6-8 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 6. PERFORATING b) Wellbore fluid pressure, temperature and density It would be expected that if the fluid in the wellbore is very dense, then it could reduce the jet velocity and impair its physical performance. However, in reality the thickness of the fluid film through which the jet moves is normally small. If however the charge size is small or the gun clearance is large, penetration could be reduced. Similarly well pressure has shown no observable effect on charge performance. This is particularly important to use reduced hydrostatic pressure in the wellbore whilst perforating in an underbalanced mode. The effect on flow performance is much more important. However, elevated well temperatures can lead to significant degradation of the charges with consequent poor performance. However, the effect is only serious in deep hot wells where the gun contact time is large. In such situations, the protection of the explosive charges by their inclusion in a hollow gun carrier is advisable. c) Gun clearance Since all perforating guns have a diameter which is substantially less than the casing inside diameter it follows that the gun cannot be expected to be centralised. If the charges are loaded on a design which calls for them to fire at different angular phasings then each charge will face a varying gap between the gun outside diameter and the inside diameter of the casing. This gap is known as “gun clearance”. The effect of gun clearance upon penetration and entrance hole size is shown in Figure 6-7 for a simulated perforating configuration. It can be seen that maximum entrance hole size is achieved with a gun clearance of 13 mm (1/2 inch) is normally provided as a defined standoff in the gun, but in general both penetration and entrance hole size decrease with increasing clearance. Figure 6-7 Typical result of perforation with 1 11/16” OD through tubing gun in a deviated casing http://www.petrom.com 6-9 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 6. PERFORATING The effect will be most serious when a very small diameter gun is used as is the case with electric wireline conveyed through tubing guns where the gun size is selected to pass through the completion string. In such cases it is recommended to place all the charges to fire in-line (zero phasing) and align the gun in the casing using a positioning device, to provide minimum gun clearance. d) Compressive strength of formation rock It would seem logical for the compressive strength of the rock to have a large effect on the physical performance of jet perforators. Although the effect is not clearly quantified, the perforation obtained is inversely proportional to rock compressive strength as shown in Figure 6-8 . It will be necessary to extrapolate test firing results obtained from a standard test material to specific reservoir rocks. In most of the cases the formation strength is not known, so the plot in Figure 6-8 could be used as a reference. e) Strength of casing and radial support of cement sheath If the casing to be perforated is constructed from high grade tensile steel, it will absorb more energy whilst being perforated and hence reduce the overall length of the perforation. In reality, the effect is relatively small. However, as the number of perforations shot into a casing increases, the structural integrity of the casing is reduced and the possibility of splitting the casing cannot be discounted. This will be a very serious consideration where the cement sheath is incomplete, as perforating a casing, behind which no cement exists, could give rise to casing rupture. Figure 6-8 Penetration reduction caused by high compressive strength of the formation rock 6-10 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 6. PERFORATING In the preparation of a perforation gun, a number of charges are assembled on a carrier such that, upon detonation, they will yield a series of perforations into the formation. The arrangement provides for variation in the number of shots to be fired per unit interval, i.e. the shot density and the direction in which all, or individual, charges will be shot, i.e. the shot phasing. The number of shots installed in a perforating gun varies from low shot density, e.g. less than 4 spm (1 shot/ft), to higher shot densities of up to 36 spm (12 shots/ft). Gun OD limits shut density. The lower shot densities are normally adequate for production in reservoirs of moderate to high productivity or are selected for specific injection operations where flow control is required. The higher shot densities will provide improved inflow performance in all reservoirs, but may only be significantly beneficial in reservoirs with a low vertical permeability or where severe local drawdown might give rise to formation sand collapse. The orientation of perforations defined as the angular phasing can be: a. 0° or in-line firing which can provide the minimum clearance for all perforations if the gun is positioned to fire on the low side of the hole. b. 45° to 90° phasing which provides the nearest approximation to radial flow. Guns used by OMV Petrom in most of the cases have 60O phasing. c. 180° phasing in either of the two planar directions. d. 120° phasing either with all 3 shots firing at 120° to each other or omitting 1 charge such that the 2 shots fire at +60° and -60° angular phase. The phase orientations are depicted in Figure 6-10. All perforation flow patterns are utilised. 90° phasing which provides the best radial depletion can be very effective when conducted with high shot densities. However, the selection of phasing will depend not only on shot densities but gun size, gun clearance, formation isotropy or anisotropy with respect to permeability. It is clear that for each shot density a number of options regarding phasing can exist, for example, 13 spm (4 shots/ft) can normally be fired at 0°, 90° or 180° phasing (Figure 6-9). Figure 6-9 Perforation shot example of 13 spm (4 spf) in line firing and 90o phasing http://www.petrom.com 6-11 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 6. PERFORATING Figure 6-10 Perforation shot pattern 6.2 Perforating Techniques An appropriate perforating technique should be selected based on the formation geological characteristics, length of interval(s) which are to be perforated, then formation fluid properties and the types of oil and gas wells (vertical, directional, or horizontal well). Industry has adopted general recommendations and guidelines for perforating technique selection adopted, but every well and reservoir needs to be evaluated for an appropriate perforating technique application. 6.2.1 Factors that should be considered for an optimum perforating job W.T. Bell has discussed gun selection parameters in several articles (1984, 1972) and concludes that shot density and penetration are the most important parameters affecting completion performance. To minimize impairment, perforations should extend at least 50 mm (2 inch) beyond any drilling damage. But having met this criterion, shot density is more important than penetration, except for limited entry stimulations. The minimum shot density should be 13 spm (4 spf) and preferably 24-36 spm (8 to 12 spf). In critical situations (e.g., tight sands, viscous oil, weak sand strengths) up to 72 spm (24 spf) may be used with a maximum of (20 spm (6 spf) in anyone plane. Typical perforating geometry is shown in Figure 6-11. 6-12 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 6. PERFORATING Figure 6-11 Typical perforating geometry High density perforating requires much less penetration than low density perforating. Provided that the casing is moderately well supported, there is little risk to casing collapse strength (typically less than 10% reduction) unless very heavy (greater than 25 gm/shot) expendable charges are used, or more than six 13 mm ( 0.5 inch) holes occur in a single plane over 0.3 m (1 foot)) interval. Hole size and phasing are less important, although a spiral pattern will obviously give a lower skin effect than linear perforations on only one side of the casing. Formation failure is not predominantly a function of perforation hole size and therefore large entrance holes can and should be used to increase the exposed sand face. However, hole size is critical for internal gravel packs and limited entry fracturing. Internal gravel packs require large hole size perforations 19 to 25.4 mm (0.75 to 1.0 inch) to minimize linear flow resistance, but penetration is not a significant factor, since the perforations will be washed. Limited entry fracturing requires smaller hole size perforations to control fluid hydraulics, to ensure differential pressure development, and to facilitate effective balloff. Gun performance data is standardized in accordance with API RP-19 (replaced former API R-43 in 2000) and is available from the perforating company as tables. Despite the fact that API R-43 has been replaced by API RP-19, some perforating companies still use API R-43 to present their gun performance data. API RP 19B is split into five sections: 1. Gun performance under ambient temperature and atmospheric test conditions into a concrete target through water. 2. Gun performance in stressed Berea sandstone targets (simulated wellbore pressure conditions). 3. The effect on performance of elevated temperature conditions. 4. Flow performance of a perforation under specific stressed test conditions. http://www.petrom.com 6-13 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 6. PERFORATING 5. Quantification of the amount of debris that comes from a perforating gun during detonation. In the API RP-19 section 1, the API sets out guidance on the preparation and size of the concrete target, the testing of the compressive strength and the data collection. Data collection includes penetration depth, the tubing/casing hole diameter and the inside burr height. Optional tests include firing in air or through multiple casing strings. Section 1 tests are relatively straightforward to undertake and frequently used to compare different gun systems. However, it is possible to optimise a gun for shooting into concrete; such a gun may outperform a competing gun in the section 1 tests, but under-perform under downhole conditions (Laws et al., 2007). Section 1 data cannot be reliably used in any downhole productivity model without extensive correction. Concrete penetration is typically 50% greater than Berea penetration. There are also widespread concerns that the API concrete specifications allow too much variation and therefore target penetrations can be variable. The API RP-19 section 2 test is more onerous. A Berea target is cut, dried and saturated with sodium chloride brine and the porosity (but not strength) of the target measured. There is a reasonable linear relationship of Berea porosity to strength. The gun is fired at 3000 psia within a closed system. The recorded data is similar to section 1. The API RP-19 section 3 is used to test guns at higher temperatures, but into steel targets. Pressure is maintained at atmospheric conditions. The guns are maintained at the nominated temperature for 1 h for wireline guns and at least 100 h for tubing conveyed guns. The API RP-19 section 4 discusses perhaps the most useful of the tests. It is a combination of a gun shoot and flow test. However, the gun configuration is largely left open to the user. The target can be a simulated reservoir rock, or even well core (assuming it is large enough). The test can be performed under confining stress. The firing of the gun can be done with chosen pore pressure, wellbore pressure and confining pressure. A core flow efficiency (CFE) is calculated from a radial flow test on the sample post perforating. This efficiency is the measured flow rate compared to what would be expected for the geometry of the perforation and target properties (including permeability and geometry). The CFE can be useful in helping define properties such as the crushed zone permeability (Roostapour and Yildiz, 2005) and thus assist with determining the skin factor. The API RP-19 section 5 provides an opportunity to collect perforation gun debris. The debris can be sieved for particle size. Both the API RP 43 and the API RP 19B tests can be plagued by difficulties in selecting a representative target. The target should be similar to downhole rock, but ideally should not have the same variability, and should be easy to source across the world. Steel is too hard, concrete too soft. The API tests, particularly section 4, provide an opportunity to determine expected perforation performance. However, due to the given difficulties in obtaining representative tests, most predictions will rely on extrapolating test data to different downhole conditions. The corrections are necessary for gun standoff, rock strength, effective stress, perforating fluid, casing thickness and strength and, to a lesser extent, pressure and temperature. A number of models are available to aid penetration prediction. Behrmann and Halleck (1988) present a large amount of comparison data for penetration into different strength Berea and concrete targets. The relationships are generally linear although it is known that Berea sandstone does not come in either very weak or very strong varieties, care must be taken in extrapolation to very strong or very weak rocks. 6-14 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 6. PERFORATING The actual downhole performance of the guns is not as good as that shown in the API RP-19. This is because: • • • • • Penetration decreases with increasing effective rock stress, and plateaus at - 70% of the total core penetration (TCP) at rock stresses => 34.5 MPa (5000 psi). Perforations are shorter and fatter under stress. Penetration varies with rock type. The stronger the rock the more powerful the charge required. For lack of a better criterion, the rock's average compressive strength is often used, but experimental data show that this is not the controlling criterion within a given rock type. There is significant reduction in penetration (-30%) with thicker casing and cement sheaths than those used in the API tests. Gun clearance is critical with small guns. Through tubing guns must be properly decentralized. Knowing all of these uncertainties, it is easy to see why the powerful tubing-conveyed perforators are being used with increasing frequency, especially under difficult conditions (e.g., deep, hard rocks; low permeabilities, gas). In some cases it is necessary to perforate through two or even three casings, so a gun with deep penetration should be used. Many old wells in OMV Petrom need to be perforated through two or even three casing strings, so guns with extremely deep penetrations need to be used. 6.2.2 Perforation Technique Selection Factors that need to be taken into account while selecting perforating technique include: • • • • • • • Formation compressive strength and stress, Reservoir pressure and temperature, Zone thickness and lithology, Formation porosity and permeability, Formation anisotropy (expressed as relationship between horizontal and vertical permeability. If not known there is an oil industry recommendation (accepted by OMV Petrom) to use kH/kV = 10), Formation damage radius, and Fluid type gas, oil or water (for water source or water injection wells). But, even before starting selecting an appropriate perforating technique, the perforating objectives and operating conditions must be fully understood. These include the following: • • • • • An understanding of the pressure environment in the well, A decision on whether or not the well will be stimulated and how, Whether or not the formation is known for sand production, Whether this is an original completion or a workover, and Whether the well is to be used for production or injection. Pressure environment - What is the formation pressure? Is it normal or abnormal? If normal, is it low enough to perforate and then run tubing? (This means not using heavy, expensive brines) If http://www.petrom.com 6-15 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 6. PERFORATING abnormally high, is the potential formation damage from perforating in heavy brines (bromides, fromates) minimal? If so, there is a choice of: 1. Weight up well completion/servicing brine, perforate overbalanced with casing gun (could be a TCP gun – “shoot & pull), then run final completion, or 2. Run the final completion in lighter fluid (underbalanced), then perforate with a through tubing gun (could be one run on coil tubing on highly deviated or horizontal wells) with Xmass tree installed, or 3. Run the final completion with a TCP gun, set packer, nipple down BOP, nipple up X-mass tree, evacuate tubing fluid with a lighter one to establish an optimum drawdown, then perforate underbalanced. So called “time delay fuses” need to be used to create an optimum perforating drawdown on wells with depleted reservoir pressures. “Time delay fuses” delay gun firing initiation, until the nitrogen, is bled off from the tubing. If abnormally low, and the formation is susceptible to damage, following could be done: • • Swab down (casing or tubing) for underbalanced perforating and perforate with casing gun, or Run tubing, swab down, and perforate underbalanced with a through tubing gun. The well will be stimulated? - If the well is going to be stimulated, will the limited entry technique is going to be used? This will depend upon whether: 1. The zones will be treated with different frac pressures (dual completions, eliminating packers and bridge plugs), or 2. Several zones will be treated in one interval. If there is either condition, limited entry stimulation should be considered. With limited entry, the number and size of perforations should be selected based on the acceptable treating rate and perforation friction pressure desired. If the well is not going to be stimulated, the perforating technique will be dictated by considerations concerning the formation pressure discussed above. If the formation is not easily damaged, the decision to run tubing before perforating is made based on the next step in the completion program. Completion for Sand Control? - Even if sand control methods are used, the same pressure environment considerations mentioned above must be reviewed. What kind of control is to be used? Rate control? Consolidation? Gravel/Frack pack? (see details in chapter 10) Briefly, however, rate control is the least expensive and the simplest to use from an operational viewpoint. Consolidation avoids the need for placing liners in the well bore. Consolidation also allows better fluid-injection control during stimulation or secondary recovery. Workovers are easier. Gravel pack offers the only practical control for long intervals. If using rate control, perforate large diameter holes, 19 to 25.4 mm (0.75 to 1 in), with 60o to 90° phasing, with high shot density 12 to 24 shots per meter (four to eight shots per foot) to minimize pressure drop through perforation tunnels. Perforate in clean, filtered well completion/servicing brine. If using sand chemical consolidation, or inside gravel/frac pack, shoot with 60o to 90° phasing, and big hole 19 to 25.4 mm (0.75 to 1 inch). However, perforating must be done in clean, filtered brines and perforations must be cleaned by 6-16 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 6. PERFORATING washing or back surging before gravel packing or injecting resins for consolidation. If the perforating inside pipe is to be done for testing purposes, the pressure (as discussed above) when perforating for production without stimulation must be considered. Reperforating during workover? - In general, there are three reasons for re-perforating: • Cement squeezing, • Remedial perforating (increasing perforation density), and • After limited entry stimulation. When it becomes necessary to squeeze, consider the environment. Are the existing perforations to be squeezed? What was the original perforation phasing? If it was 0° phasing or if there are no existing perforations, 90° phasing with 13 shots/m (4 jet shots/ft) should be implemented. 0.3 to 0.6 m (1 or 2 ft) at the most should be shot. When remedial perforating is undertaken, the objective is to improve perforation productivity (or injectivity). Two classic examples would be to re-perforate because: • Perforations are plugged with scale, paraffins, asphaltenes, etc., or • Insufficient perforation penetration, as in older wells. In either case, shot phasing, density of the remedial perforations, and gun selection should follow the same procedure as if these were new perforations for production or injection. However, the age and probable condition of the casing, including shot density of existing perforations, must be considered. The casing in some older wells could be relatively fragile, so original perforating /re-perforating reports should be checked in order to find out the existing casing strength reduction before adding more perforations and weaken it further. Often, high-volume wells will require additional perforations following limited entry stimulation. The low shot density required for limited entry creates a form of pseudo damage that can be alleviated by additional perforating. Perforating technique/system can be designed using newer, sophisticated perforating analysis software programs (like Schlumberger’s SPAN) which predict perforating efficiency under downhole conditions. OMV Petrom workover/completion engineers have used a customer copy of SPAN software for a while for designing perforating jobs, due to courtesy of Schlumberger. But, another perforating softwares are available, like “IPERF” (designed by Geodynamics) and could be available through Weatherford perforating services. To help identify the appropriate gun systems for a specific application, these programs combine modules that estimate downhole penetration, calculate productivity and determine optimal underbalance. With all the tools and techniques that are available to the completions/workover engineer, the best perforation designs are always based on specific well requirements to optimize production. A semianalytical perforation skin model was created by Karakas and Tariq (1991), by which a total perforating skin (including a crushed zone around perforations skin) can be calculated. That would be a good way for calculating total perforating skin created by different suppliers’ guns, in order to compare created total perforating skins under the same conditions. The Excel spreadsheet presented in Appendix 6-B Perforating Skin Calculation) can calculate the total perforating skin created by a certain perforating gun. It’s been created based on the above mentioned Karakas and Tariq model http://www.petrom.com 6-17 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 6. PERFORATING and can be used as a “comparative” model, based on which a gun that creates the minimum total perforating skin, under the same conditions, can be picked up as an optimum one. Perforating simulations with appropriate software is strongly recommended when formation needs to be penetrated, through more than one casing strings. 6.3 Perforating Technique Types There are four basic perforating techniques, based on a differential between the reservoir pressure and the well fluid hydrostatic column pressure, at the time of perforating: • Overbalanced (well fluid column hydrostatic pressure greater than the reservoir pressure) – Figure 6-12 a. • Balanced (There is no pressure differential between the reservoir pressure and the well fluid column hydrostatic pressure) – Figure 6-12 b. • Underbalanced (reservoir pressure greater than the well fluid column hydrostatic pressure – could be done with a through tubing gun or with a TCP gun) – Figure 6-12 c, and • Extreme overbalanced pressure (well fluid column hydrostatic pressure is much higher than the reservoir pressure, and can induce fractures at the moment of perforating) – Figure 6-13. Figure 6-12 a) Overbalanced perforating w/through csg Gun; b) Underbalanced perforating w/through tbg gun; c) Underbalanced Perforating w/ a TCP gun Overbalanced (when the reservoir pressure is depleted even balanced and slightly underbalanced) perforating technique can be done with a through casing run gun on an electric wireline. Underbalanced perforating is generally superior to conventional overbalanced perforating for the following reasons: • All perforations will be exposed to a high differential pressure and have an opportunity to immediately back flow into the wellbore. 6-18 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 6. PERFORATING • • • • • Sensitive formations will not be exposed to the completion fluid. It facilitates faster and more effective cleanup. It establishes the productive potential of marginal zones. It minimizes the ambiguity of test results. It reduces the safety hazards involved with setting production equipment in a potentially live well. Figure 6-13 Extreme overbalanced perforating Figure 6-14 shows how perforation tunnels look like after an overbalanced perforating followed by flowing the reservoir fluid inflow and how perforation tunnels look like immediately after an optimum underbalanced perforating. Underbalanced perforating can be done with: • • Through tubing electric wireline or coil tubing conveyed gun, with final completion run in hole and X-mass tree installed at surface. Through casing tubing conveyed gun, run in hole with a final completion and with X-mass tree installed at surface. TCP gun firing head initiation could be done by using a drop bar system, pressure initiation by either tubing pressure or differential pressure between annulus and rat hole, or electrical initiation. Extreme overbalanced perforating creates small fractures around opened perforation tunnels, which improves communication between the well and the reservoir. The pressure in the well during perforating should be higher than the formation fracturing pressure. The studies indicate that the extreme overbalance pressure gradient should be sufficiently high in order to move out the debris http://www.petrom.com 6-19 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 6. PERFORATING created during perforating and is generally greater than 0.3 bar/m. Some industry sources recommend that pressure gradient during extreme overbalance perforating sluld be even up 2.3 bar/m (1psi/ft). Usually way to create such pressure gradient is to have a nitrogen cushion inside tubing and to apply appropriate surface pressure. Figure 6-14 Difference between an overbalanced created, cleaned perforation tunnel and the underbalanced created perforation tunnel 6.3.1 Special Perforating Techniques Special perforating techniques are as follows: • • • • • Tubing punchers, Stim guns (originally launched by Halliburton), Oriented guns, Slickline guns, and Dynamic underbalance guns (Schlumberger “PURE GUN”, creates a dynamic underbalance just after the gun fires). Tubing punchers are used to punch holes in a tubing string to establish pressure equalization or circulation between the tubing and the annulus. Tubing punchers are selected for the thickness of the inner tubing or casing string to avoid damage to the surrounding outer string. Tubing puncher is used when for pressure equalization between tubing and annulus or for establishing a circulation between tubing and annulus when sliding sleeve doesn’t exist or is not functional. Almost all perforating companies claim to have so called stim guns, which allegedly create small fractures during the perforating process, enabling better well performance then the standard guns. Some oil and gas companies reported their successful use on some wells, but there are also reports claiming that those kinds of guns have been used with mixed success. 6-20 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 6. PERFORATING Dynamic underbalance guns, like Schlumberger “Pure” gun, generate a high dynamic underbalance from a modest initial underbalance or overbalance. Like with implementing any other technology, “Pure” gun is not a solution for every well. Schlumberger offers the PURE planning software, which should be used together with Schlumberger SPAN software for evaluating wells for an eventual implementation of this technology. But, it is important to point out that dynamic underbalanced perforating does not replace matrix acidizing and chemical treatments to remove near wellbore formation damage from drilling or completion fluid losses, organic deposits and mineral scale. This gun type has never been used in OMV Petrom until now. Oriented guns can be used to perforate wells for hydraulic fracturing in a certain direction, only in cases when the orientations of the principal horizontal in situ stresses are known. Oriented perforating in right direction can substantially reduce near well bore friction, caused by tortuosity and multi fractures formation, which in turn can substantially reduce risk of early sand out during the frac job. Slickline perforating is a kind of recent perforating technique and hasn’t been widely accepted by the industry so far. 6.3.2 Overview of Applied Perforating Techniques In OMV Petrom Majority of the wells drilled in OMV Petrom are perforated through with casing guns (TCP preferable), underbalanced whenever it’s possible. There are cases when reservoir pressures are so low, and underbalanced perforating is basically not possible. In those cases wells are perforated overbalanced in clean, filtered brine, compatible with the reservoir rock and reservoir fluids with viscous pills covering the interval to be perforated in order to minimize fluid loss. TCP casing guns are used on wells where long intervals are to be perforated (usually longer than 12 m/40 ft). Underbalanced through tubing guns are used on HP/HT exploration and appraisal wells, with the final completion run in hole and X-mass tree installed on surface. Packers on those wells are usually set far above intervals to be perforated and tested. Perforated intervals which won’t be put on production are usually isolated with through tubing inflatable bridge plugs before the shallower interval(s) are to be perforated for a production test and further production. Underbalanced perforating with through tubing CT conveyed gun, as well as extreme overbalanced perforating, have never been done in OMV Petrom so far. 6.3.3 Different Gun Types And Performances There are three basic types of guns: • Casing guns, • Expendable guns, and • Through tubing guns. The casing gun (Figure 6-15 a), which can be run into the well on an electric wireline or conveyed by tubing (TCP gun), is available in a variety of diameters ranging from approximately 3.5 to 18 cm (1.38” to 7”). The charges are contained in a steel tube protected from impact and from the well fluids and are arranged so that they face radially outward from the vertical axis of the carrier. Some of the advantages of this type of gun are that it is retrievable, thereby enabling inspection to verify http://www.petrom.com 6-21 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 6. PERFORATING firing of all charges, it contains much of the debris, and partially shields the casing from the force of the charge. This is a highly reliable device, but it is largely constrained by two factors: • • The gun diameter must be less than the casing inside diameter. This allows a large diameter gun to be used and hence large charges. Gun swelling after charges are fired should also be taken into account. Perforating companies should provide gun swelling information, but typically it’s about 6% of the gun OD. The length of gun is defined by either the weight which can safely be suspended by the wireline or by the length of lubricator into which the gun will be retrieved after perforating in underbalanced conditions. It is possible to perforate underbalanced using a tubing-conveyed casing gun. The gun is placed on the front end of a tubing string as it is run into the well. The tubing may be run in the well containing whatever fluid that is required to maintain the desired differential between the fluid in the casing (hydrostatic) and the formation. For example, the tubing-conveyed gun can be safely fired with high differential pressure into the wellbore (underbalanced) to help flush the debris from the perforations since a wellhead is in place at the surface. This is a highly desirable procedure which has resulted in increased use of tubing-conveyed or through tubing jet guns. If intervals are vertical and short (less than 15 m/50 ft), and perforated in balanced or overbalanced conditions, electric wireline perforating usually can be performed in several hours and may be the most efficient method. Otherwise, a TCP gun system should be considered as the best option, taking into account an economic evaluation of both options as well. The expendable through tubing/casing guns (Figure 6-15 b) are composed of die-cast aluminum, ceramic, or glass charge cases with built-in links or arms hooked together. These materials are designed to disintegrate into small particles and drop to the bottom of the well when the gun is fired. The expendable gun is not used as much as the casing gun because there is no way to examine the gun and verify firing, most of the energy from the charge detonation must be adsorbed by the casing and fluid system which sometimes results in casing damage, and finally expendable guns are more difficult to position. These guns do have the advantage of containing a greater explosive charge for a fixed running diameter and are flexible enough to allow running through crooked casing or tubing. Expendable-type guns should never be operated over 150o C (300o F). 6-22 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 6. PERFORATING Figure 6-15 a) Wireline conveyed through casing hollow carrier perforating guns; b) Wireline conveyed expendable perforating guns Through tubing hollow carrier guns (Figure 6-16 a) are smaller in diameter than casing guns and, therefore, they contain smaller charges, usually fixed so that all of the guns fire in the same direction (0° phased), and may produce smaller entry holes and shorter perforations. Relatively new through tubing, hollow carrier perforating guns can perforate at 60o phasing and at up to 24 shots/m (6 shots/ft). However, because they can be run with tubing and packer in place, their poorer performance is sometimes overlooked. The main impetus for their use stems from the advantages of being able to perforate under conditions such that the pressure in the well is less than the reservoir pressure (underbalanced). Gun swelling should be taken into account, before picking the optimum gun OD for through tubing perforating. Usual practice is to RIH previously fired, swollen hollow carrier of the same initial OD as the gun proposed for the job, to check if it will pass through tubing and get out of it without problems. Gun performance depends on: • Gun standoff and clearance [bigger stand off (hollow carrier guns) and clearance, shorter penetration] – as shown in Figure 6-16 b. • Casing wall thickness and hardness. • Penetrating through single, dual or even triple casing wall. • Formation rock properties. • Wellbore pressure. http://www.petrom.com 6-23 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 6. PERFORATING Figure 6-16 a) Wireline conveyed through tubing hollow carrier perforating guns; b) Charge Standoff and Gun Clearance Visualizations 6.4 Surface Equipment The majority of perforating operations are conducted under conditions of underbalanced pressure. In the case of through tubing guns particularly, there will be a need to allow retrieval and removal of the gun from the well on which there will exist a wellhead pressure after perforating. There will therefore be a need to assemble a lubricator and wireline BOP in much the same manner as for the conventional slick wireline. Normally both a hydraulically actuated and a manual BOP valve are located at the base of the lubricator. In addition, since the gun will be lowered on a braided electrical conductor cable, the sealing of pressure as the cable leaves the lubricator will be a serious problem. In conventional slick line, a stuffing box can be reasonably effective on a single strand line. However, when perforating, sealing is provided by grease injection through a port into a flow-tube through which the cable passes. 6.4.1 Wellhead Pressure Control Assembly The use of wellhead pressure equipment is standard practice in perforating wells, whether the service is performed in casing or through tubing. When perforating with casing guns, a hydraulically operated line pack-off is used at the top of the lubricator to seal off well pressure (if any should develop) and to insure complete safety. Figure 6-17 shows a standard wellhead set up for perforating or other electric wireline operations which are performed under pressure. In thru-tubing work, when a small loss of fluid can be tolerated, flow tubes are used to allow well entry and exit under pressure. The flow tube assembly is shown in Figure 6-17 a. The flow tube orifices are just large enough to permit passage of the wireline. The internal arrangement of the flow tube causes a pressure drop so that fluid passage is reduced to a minimum. The fluid that docs pass through the flow tube is drained off to the reserve pit. When no loss of fluid can be tolerated the 6-24 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 6. PERFORATING high pressure grease injection equipment is used as shown in Figure 6-17 b. Control fluid is injected into the seal tubes under automatic pressure control to prevent the loss of any well bore fluid. Figure 6-17 a) Flow Tube Assembly; b) Grease Injection Head; c) Electric wireline BOP and lubricator Figure 6-18 Twin, hydraulically operated blowout preventer used with both the flow tube and grease injection equipment. Figure 6-18 shows a typical twin, hydraulically operated blowout preventer used with both the flow tube and grease injection equipment http://www.petrom.com 6-25 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 6. PERFORATING 6.5 Materials for Perforating Detonator - The detonator or blasting cap, which initiates the firing sequence, can be activated by heat or shock. In electric wireline guns heat is generated by passing current through safety resistors to a filament. The hot filament ignites a match compound which detonates the primer charge, lead acidize, which in turn detonates the booster section across an air gap. The resistors prevent accidental firing due to stray currents. The gap interrupts the detonation sequence in case liquid enters the hollow carrier gun through a leaking seal. (Firing a hollow carrier gun partially filled with liquid could burst the gun.) In an exposed charge gun the detonator is pressure sealed and does not contain an air gap. In tubing conveyed guns (TCP), firing can be initiated by several different techniques. The detonator can be set off by a firing pin device activated by a drop bar, or pressure increase, or combination of the two. Or, a wireline can be run from the surface inside the TCP string to transmit electrical current through a wet connect hook-up. The latter system provides more flexibility and safety. Obviously, a premature detonation from any source is a prime safety consideration. Lead azide, one component used in detonators is a primary explosive and is very sensitive to shock and temperature. A very important consideration is the downhole timetemperature limits of the detonator. This is particularly true for TCP equipment. Detonators are available that can be safely exposed to 246oC (475°F) for extended periods, but all conditions must be carefully specified. Detonating Cord-The detonating cord, activated by the detonator carries the high order shock wave needed to detonate each shaped charge. Primacord contains a secondary explosive, which detonates almost instantaneously [detonation rate > 6100 m/s (20,000 ft/sec)]. Shaped charge - The shaped charge, (Figure 6-3), consists of five principal components: the detonating cord, the case, the primer charge, the main explosive and the cone-shaped liner. The case contains the detonation force of the main charge long enough for the jet to form. It also restricts interference with adjacent charges. It is commonly made of machined or cold formed steel, although some through-tubing charge cases are die cast aluminium, or zinc, or ceramic. The explosive and the liner are most important. The explosive is a secondary explosive, often similar to that in the detonating cord and requires a high intensity shock from the primer to detonate. Usually, the primer is a small amount (1 gm) of the same explosive as the main charge, except that it is un-waxed and more finely granulated, and, therefore, more sensitive than the main charge. Upon detonation of the main charge the tremendous created pressure causes the liner cone, starting at the apex, to collapse or flow forming the focused high velocity jet stream. The inner portion of the liner flows toward the apex and continuously feeds into the jet stream. The outer portion, perhaps 80% of the total volume of the liner, follows the jet stream at a much lower velocity. These slower particles can coalesce into a metallic slug, which can partially plug the perforation. Both the sintered particle and the sheet copper alloy liners are used today. Premium charges usually are sintered particle configurations. Some big hole charges use a wrapped copper liner. A wrapped liner can cause a problem with focusing (discussed later). Other big hole charges contain a liner made from a solid copper alloy sheet which is drawn into a hemispheric, parabolic or more complex shape. Big hole charges must be designed so that the resulting slug is small compared to the diameter of the hole produced in order to minimize plugging. 6-26 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 6. PERFORATING 6.5.1 Explosives The family of high explosives can be subdivided into two categories: • Primary, and • Secondary. Primary high explosives are used in initiators only; their sole purpose is to start the detonation reaction with a small energy input (usually by electrical heating of a filament wire or by impact). They are sensitive to energy inputs from heat, flame, friction, impact, and static discharge. Some primary explosives are sensitive to energy inputs as low as a few ergs; this presupposes that they must be used with great care. The oil industry still uses devices that contain primary explosives, but is rapidly moving away from them because of their sensitive nature. Secondary high explosives are used in all three components (detonators, detonating cord, and shaped charges) of the explosive train. The secondary explosives are much less sensitive to external stimuli than are primary explosives, and therefore are much safer to handle. Because of their insensitivity, they are somewhat difficult to initiate, but once initiated they release tremendous amounts of chemical energy in microseconds. Although TNT is a common secondary explosive, its relatively low thermal stability prevents it from being a viable oilfield explosive. For oilfield use the most widely used secondary explosives are RDX, HMX, HNS, and PYX. These four explosives differ in thermal stability and are necessary because of the wide range of downhole temperatures encountered worldwide. Table 6-1 gives additional information about these explosives. As a general rule, high temperature charges should be avoided unless absolutely necessary. This recommendation is based on the following: • Most high temperature charges provide less penetration. • High temperature powder is less sensitive resulting in increased misfires. • High temperature charges are more expensive. • There is much less choice in charge selection. Table 6-1 – Characteristics of secondary explosives Chemical Formula Density (kg/m3) Detonation Speed (m/s) Detonation Pressure (MPa) C3H6N6O6 1800 8750 34500 C4H8N8O8 1900 9150 39300 HNS Hexanitrostilbene C14H6N6O12 1740 7400 24100 PYX Bis(picrylamino)-3,5dinitropyridin C17H7N11O16 1770 7600 25500 Explosive RDX Cyclotrimethylene trinitramine HMX Cyclotrimethylene tetranitramine When operating near the upper limit of low temperature charges these approaches may be used: http://www.petrom.com 6-27 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 6. PERFORATING 1. Circulate to reduce wellbore temperature prior to perforating. This works effectively for through tubing guns which can be run to bottom soon after fluid circulation has been stopped. 2. If there is some question as to whether the temperature limit of the gun will be reached prior to firing the gun, high temperature detonators may be used with conventional RDX explosive in the shaped charges. This will prevent accidental perforating in the wrong interval due to high temperature. Charges exposed to excessively high temperature deflagrate, or bum, rather than explode to create an undesired perforation hole. Figure 6-19 Explosive Temperature Rating For Hollow Carrier Guns 6.5.2 Perforating Fluids Perforating overbalanced (differential pressure acts towards the formation to be perforated) with mud or solids-containing-fluid in the casing, leaves every perforation filled with mud solids, charge debris, and crushed formation rock. This is the worst possible scenario for well productivity, and is not recommended to implement that scenario at all. The pressure differential needed to initiate flow varies for each perforation. When a few perforations open up, flow through these perforations makes it difficult to create the higher pressure draw down needed to open additional perforations. Even though the well may produce fluid to the surface, most perforations are not contributing, and in layered zones, effective reservoir drainage will not be achieved. Carbonate formations may represent an exception if the perforating fluid is acid. It is possible to obtain high well productivities by perforating in HCI or Acetic Acid with a small differential pressure into the formation. The acid is slowly pumped into the formation below fracture pressure, if possible, to react with the carbonate rock and create channels around the perforating debris. Because of the slow reaction of Acetic Acid on limestone it is usually desirable to leave the acid in the formation for several hours after perforating. When perforating in HCl acid, exposed aluminium charges should not be used because of the solubility of aluminum in HCl acid. Acetic acid does not dissolve aluminum. Underbalanced perforating (differential pressure acts towards the well bore) with no-solids clean and filtered brine in the casing is the best scenario for sandstone formations and for most carbonates. The amount of underbalance needed to maximize productivity depends on several factors, including: • Formation type, 6-28 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 6. PERFORATING • • • • Reservoir fluid, Charge selection, Shot density, and Wellbore fluid. Generally, there are not firm opinions on industrial recommendations regarding perforating drawdown requirements, summarized in Table 6-2. However, it is generally agreed that it is much harder to clean up gas sands and low permeability zones, and therefore higher drawdowns should be used in such cases. Table 6-2 gives the commonly recommended drawdowns. Table 6-2 Recommended perforating drawdowns Recommended Drawdown* Formation Permeability (mD) (bar) (psi) >150 14 - 35 200 - 500 Oil 75 - 150 35 - 69 500 - 1000 <75 69 - 140 1000 - 2000 >100 35 – 69 500 – 1000 50 – 100 69 -140 1000 – 2000 Gas 10 - 50 140 – 210 2000 – 3000 2 - 10 210 - 280 3000 – 4000 <1 350 5000 *1. Subject to limits imposed by rock strength from the point of view of sand failure 2. Through tubing carrier guns require a finite bottom hole pressure to control swelling (250 psi in liquid and 500 to 4500 psi in gas). The weight of the gun should also be designed to control lifting by flow . Formation Fluid After perforating, the well should be flowed for a long enough period to clean most perforations. That’s typically 24 hrs flow on clean up for gas wells, or naturally flowing oil wells, and recovering all fluids lost in formation plus at least two well volumes at surface on oil wells with an artificial lift system installed. If the well is shut in too quickly (to pull a TCP or through tubing perforator) many perforations may remain plugged or become plugged due to setting of solids in the well during the shut in period. 6.6 OMV Petrom Current Perforating Best Practice Workflow Current OMV Petrom perforating best practice work flow is shown in Figure 6-20 and Figure 6-21. http://www.petrom.com 6-29 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 6. PERFORATING Figure 6-20 Perforating Best Practice workflow applied in OMV Petrom 6-30 http://www.petrom.com 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 6. PERFORATING Figure 6-21 Perforating Best Practice workflow applied in OMV Petrom (continuation) http://www.petrom.com 6-31 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 6. PERFORATING 6.7 Quality Assurance and Perforating Safety Requirements Shaped charges are dangerous by nature and using them requires compliance with safety practices. Electrical system check must be done before perforating. The aim of checking up the electrical system is to prevent any risk of eddy currents (equipment is earthed, no welding allowed, no improvised electric wiring, etc.). Appropriate safety rules have to be implemented during perforated operations. Service companies as well as oil and gas companies usually have their own safety guidelines which must be followed during perforating operations, while service company safety guidelines must be in compliance with oil and gas company safety guidelines. Perforating operations are not to be performed in the following cases: • During bed weather conditions (storms, heavy rain/snow, flood, etc). • At night, except if the reservoir is already known and provided appropriate measures have been planned (emergency evacuation procedure, adequate lighting, etc.). • When the operation is carried out with overbalanced pressure before equipment installation, well safety is ensured by: • The completion fluid in the well, • The appropriate BOPs, and • A high-pressure pump connected to the well on stand-by. In addition, the stability of the well is monitored each time the gun is fired and while pulling out of hole. When the operation is performed with underbalanced pressure after equipment installation, well safety is ensured by: • The production wellhead along with a high-pressure. Pressure-tested lubricator with a stuffing box and a BOP adapted for use with an electric cable. • A high-pressure pump connected to the well on stand-by. Additionally, the wellhead pressure is monitored each time the gun is fired and while pulling out of hole. Further precautions when loading, starting to run in and concluding pull out, following measures are also necessary: • Cut off all radio broadcasting (radio silence), including mobile phones (notify the base and logistics). • Get non-essential personnel out of the rig floor • Keep anyone from standing in the line of fire. • Take extra care while pulling out, if there has been a misfire and follow the procedure and guidelines for gun retrieval and lay down at surface in case of misfire from perforating service company. 6.7.1 Perforating Quality Control Quality control Incorporates strictly following all adopted safety rules and regulations, checking if guns are loaded and positioned on depth properly, and if all charges fired, which can be checked after pulling the gun out of hole (hollow carrier through tubing and through casing guns). Unfortunately, expanded guns can’t be checked if all charges fired, due to “losing” it in the hole after perforating. 6-32 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 6. PERFORATING Depth Control A wireline conveyed perforating system consists of a cable head, a correlation device, and one or more guns. With through tubing perforators, a gun orienting device (usually magnetic) is needed to turn properly the charges to fire directly into the casing to minimize gun to casing clearance. A reference log, from which the intervals to be perforated are selected should be available at the well site. The reference log can be an open-hole log, or a cased hole log, or a perforating depth control log. If the plan is to use a selective firing head, never use it while correlating with e.g. GR during the first run. There is a risk after the first shot that the GR might be damaged and is out of order. If a perforation depth control log is not available, a correlation nuclear/collar log should be run across the perforation interval and must include several casing collars. When the casing is run, positioning a marker joint (casing joint much shorter than other joints); or a radioactive (RA) collar, near the perforation interval permits positive collar identification. The nuclear/collar log must then be correlated with the reference log, and if the nuclear/collar log is not "on depth" with the reference log, the perforation intervals must be properly corrected using the difference. The gun is then positioned for perforating using the collar locator (CCL), again correcting for the distance between the CCL and the top perforating charge. Corrections must be made properly. It is not unusual to find perforations 3 to 6 m “off” (10-20 feet), because a correction has been added rather than subtracted, or vice versa. Positioning tubing conveyed guns is often more time consuming and probably not as precise as with electric wireline guns. Several techniques can be used: • Tag a known reference point (preset bridge plug) and pick up to the appropriate depth. • Set a packer on a wireline at an appropriate known depth, and sting into it with the guns and completion string. • Run the TCP to the approximate perforating depth. Then log a short section with a through tubing GR/collar locator to locate a radioactive marker sub in the TCP string. Tie the RA marker to open ole or (cased hole) logs using the through tubing GR for correlation. Move the TCP string to properly position the guns, set the TCP packer, and recheck the positioning with the GR/collar locator. The last method, Figure 6-22, is the most commonly used of the three. If desired, a RA tagged casing collar can be installed when the casing is run and tied into larger casing GRs. A RA tagged bullet placed at a known point in the interval to be perforated is another option. Typically a pair of geophones is used while perforating with a TCP gun for firing confirmation. http://www.petrom.com 6-33 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 6. PERFORATING Figure 6-22 Through tubing correlation log before packer setting/TCP perforating 6-34 http://www.petrom.com 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 6. PERFORATING Appendix 6-A Geodynamics Guns Specification Details Table 6-3 reactive Perforating System http://www.petrom.com 6-35 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 6. PERFORATING Table 6-4 Industry Leading Penetration 6-36 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 6. PERFORATING Table 6-5 Conventional materials and technology http://www.petrom.com 6-37 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 6. PERFORATING Appendix 6-B Perforating Skin Calculation Figure 6-23 Perforating Skin Calculator 6-38 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 6. PERFORATING Figure 6-24 Perforating skin calculator (continuation) http://www.petrom.com 6-39 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 6. PERFORATING List of Figures Figure 6-1 “Bullet” gun perforator, Figure 6-2 Sand Jet Perforator, Figure 6-3 Jet charge elements, Figure 6-4 Jet perforating sequence, Figure 6-5 Impact of different shape charge geometrical parameters on perforation tunnel penetration length, entrance hole ID, and volume, Figure 6-6 Effect of gun size on entrance hole and depth of penetration, Figure 6-7 Typical result of perforation with 1 11/16” OD through tubing gun in a deviated casing, Figure 6-8 Penetration reduction caused by high compressive strength of the formation rock, Figure 6-9 Perforation shot example of 13 spm (4 spf) in line firing and 90o phasing, Figure 6-10 Perforation shot pattern,, Figure 6-11 Typical perforating geometry Figure 6-12 a) Overbalanced perforating w/through csg Gun; b) Underbalanced perforating w/through tbg gun; c) Underbalanced Perforating w/ a TCP gun, Figure 6-13 Extreme overbalanced perforating, Figure 6-14 Difference between an overbalanced created, cleaned perforation tunnel and the underbalanced created perforation tunnel, Figure 6-15 a) Wireline conveyed through casing hollow carrier perforating guns; b) Wireline conveyed expendable perforating guns, Figure 6-16 a) Wireline conveyed through tubing hollow carrier perforating guns; b) Charge Standoff and Gun Clearance Visualizations, Figure 6-17 a) Flow Tube Assembly; b) Grease Injection Head; c) Electric wireline BOP and lubricator, Figure 6-18 Twin, hydraulically operated blowout preventer used with both the flow tube and grease injection equipment. Figure 6-20 Perforating Best Practice workflow applied in OMV Petrom, Figure 6-21 Perforating Best Practice workflow applied in OMV Petrom (continuation), Figure 6-22 Through tubing correlation log before packer setting/TCP perforating, Figure 6-23 Perforating Skin Calculator, Figure 6-24 Perforating skin calculator (continuation). 6-40 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 6. PERFORATING List of Tables Table 6-1 – Characteristics of secondary explosives, Table 6-2 Recommended perforating drawdowns, Table 6-3 reactive Perforating System, Table 6-4 Industry Leading Penetration, Table 6-5 Conventional materials and technology. http://www.petrom.com 6-41 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 6. PERFORATING References 1. Ayouu, .I. A., Bourdet, D. P, and Chauvel, Y. L., "Impulse testing," SPEFE September 1988, pp. 534-546. 2. Bell, W. T., "Perforating underbalance-evolving techniques," Distinguished author series, JPT, October 1984, pp. 1,653-1,662~ 3. Bell, M. R. G., Davies, J. B. and Simonian, S., “Optimized Perforation – From Black Art to 4. Engineering Software Tool”, SPE 101082, 2006. 5. Bell, W. T., Golian, T. G., Reese, J. W., et al., “Measuring Shaped Charge Gun Performance – An 6. Alternate API Section 1 Target” SPE 679552000. 7. Besson, J., “Performance of Slanted and Horizontal Wells on an Anisotropic Medium” SPE 20965, 1990. 8. Behrmann, L. A., “Underbalance Criteria for Minimum Perforation Damage” SPE 30081, 1996. 9. Behrmann, L. A. and Halleck, P. M., “Effect of Concrete and Berea Strengths on Perforator Performance and Resulting Impact on the New API RP-43” SPE 18242, 1988a. 10. Behrmann, L. A. and Halleck, P. M., “Effects of Wellbore Pressure on Perforator Penetration Depth.SPE 18243, 1988b. 11. Behrmann, L. A., Li, J. L. and Li, H., “Borehole Dynamics During Underbalanced Perforating”., SPE 38139, 1997. 12. Behrmann, L. A. and McDonald, B., “Underbalance or Extreme Overbalance”. SPE 31083, 1996.. 13. Behrmann, L. A. and Nolte, K. G., “Perforating Requirements for Fracture Stimulations”, SPE 59480, 1999.. 14. Behrmann, L. A., Pucknell, J. K. and Bishop, S. R., “Effects of Underbalance and Effective Stress on Perforation Damage in Weak Sandstone: Initial Results”, SPE 24770, 1992.. 15. Blosser, W. R., “An Assessment of Perforating Performance for High Compressive Strength Non-Homogeneous Sandstones”, SPE 30082, 1995. 16. Bowling, J., Khan, M., Mansell, M., et al., “Underbalanced Perforation and Completion of a Long Horizontal Well: A Case History”, IADC/SPE 108339, 2007. 17. Carslaw, H. S. and Jaeger, J. C., Conduction Of Heat in Solids, Second Edition, Oxford University Press, 1959. 18. Crawford, H. R., "Underbalanced perforating design," SPE paper 19749, 64th Annual Technical Conference and Exhibition of SPE, San Antonio, Texas, Oct., 8-11, 1989. 19. Coates, G. R. and Denno, S. A., "Mechanical properties program using borehole analysis and Mohr's circle," paper DD, Transactions of the SPWLA 22nd Annual Logging Symposium, Mexico City, June, 23-26, 1981. 20. Colle, Ed., "Increase production with underbalanced perforating”, Petroleum Engineer International, July 1988, pp. 39-42 21. Chang, F. F., Mathisen, A. M., Kageson-Loe, N., et al., “Recommended Practice for Overbalanced Perforating in Long Horizontal Wells”, SPE 94596, 2005. 22. Earlougher, R. C., Jr., Advancer in Well Test Analysis, SPE Monograph Vol. 5., SPE of AIME., 1977. 23. Grove, B., Heiland, J., Walton, I., et al., “New Effective Stress Law for Predicting Perforation Depth at Downhole Conditions”, SPE 111778, 2008. 24. Garcia, D. J. and Paslay, P. R., "Prediction of gun-cable behavior when perforating gas zones under high reverse pressures," lADC Conference, 1981. 25. Halim, A. and Danardatu, H., “Successful Extreme Underbalance Perforation in Exploration Well, Donggi Gas Field, Sulawesi”, SPE 80512, 2003. 26. Halleck, P. M. and Deo, M., "The effects of underbalance on perforation flow," SPE paper 16895, 62nd Annual Technical Conference and Exhibition of SPE, Dallas, Sept., 27-30, 1987. 6-42 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 6. PERFORATING 27. Jacob, C. E., o'ld Lohman, S. W., "Nonsteady flow to a well of constant drawdown in an extensive aquifer," 7rans., AGU August 1952, pp. 5.19-569. 28. Johnson, C. R., Greenkorn, R. A., and Woods, E. G., "Pulse testing: A new method for describing reservoir properties between wells," jPT, December 1966, pp. 1,599-1,604. 29. Krueger, R. F., "An overview of formation damage and well productivity in oilfield operations," Distinguished Author Series. 1PT, February 1986, pp. 131-152. 30. King, G. E, Anderson, A., and Bingham, M. D., "A field study of underbalance pressures necessary to obtain clean perforations using tubing-conveyed perforating," JPT June 1986, pp. 662-664. 31. Meunier, D., Wittman, M. J. and Stewart, G., "Interpretation of pressure build up test using in-situ measurement of after flow," JPT, January 1985, pp. 143-152. 32. Morris, C. W., and Ayoub, J. A., "Engineered perforating design and evaluation," SPE paper 18840, SPE Production Operations Symposium, Oklahoma City, March, pp. 13-14, 1989. 33. McLeod, H.O., "The effects of perforating conditions on well performance," JPT, January 1983, pp. 31-39. 34. Regalbuto, J. A., and Riggs, R. S., "Underbalanced perforation characteristics as affected by differential pressure," SPEPE, February 1988, pp. 83-88 35. Regalbuto, J. A., and Riggs, R. S., "High differential pressure, radial flow characteristics of gun perforations," SPE paper 14319, 60th Annual Technical Conference and Exhibition of SPE, Las Vegas, Nev., Sept., 22-25, 1985. 36. Straeke, M. L., "Success in offshore gravel pack methods," SPE paper 16212, Production Operations Symposium, Oklahoma City, March, 8-10, 1987. 37. Simmons, J. F., "Convolution analysis of surge pressure data," jPT, January 1990, pp. 74-83. 38. Houze, O. P., Horne, P., and Ramey, H. J., Jr., "Infinite conductivity vertical fracture in a Reservoir with Double Porosity Behavior," SPE paper 12778, SPE Annual California Regional Meeting, Long Beach, Calif., April, 11-13, 1984. 39. Tariq, S. M., and Ayesteran, L., "Analysis and applications of pressure, flow rate, and temperature measurements during a perforating run," SPE paper 15475 presented at the 61st Annual Technical Conference and Exhibition of SPE, New Orleans, La., Oct., 5-8, 1986. 40. Stutz, H. L. and Behrmann, L. A., “Dynamic Under Balanced Perforating Eliminates Near Wellbore Acid Stimulation in Low-Pressure Weber Formation”, SPE 86543, 2004. 41. Walton, I. C., “Optimum Underbalance for the Removal of Perforation Damage”, SPE 63108, 2000. 42. Walton, I. C., Johnson, A. B., Behrmann, L. A., et al., “Laboratory Experiments Provide New Insights into Underbalanced Perforating”, SPE 71642, 2001. http://www.petrom.com 6-43 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 7. TECHNOLOGICAL OPERATIONS 7. TECHNOLOGICAL OPERATIONS Contents EXECUTIVE SUMMARY ......................................................................................................................... 7-1 7. TECHNOLOGICAL OPERATIONS ........................................................................................................ 7-3 7.1 Overview of Technology Operations in Wells (Slickline, Coiled Tubing, Nitrogen Unit, Snubbing, Wireline and Production Logging) .......................................................................... 7-3 7.2 Slickline Operation ................................................................................................................... 7-3 7.1.1 Slickline Equipment and Tools .......................................................................................... 7-5 7.1.2 Slickline Job Planning and Preparation ........................................................................... 7-10 7.1.3 Rig-up and Rig-down....................................................................................................... 7-11 7.1.4 Type of Slickline Operations and Interventions.............................................................. 7-13 7.1.4.1 Gas Lift related (Side pocket mandrels and GL valves) ........................................... 7-13 7.1.4.2 Flow control devices operated by slick line............................................................. 7-14 7.1.4.3 Subsurface safety valve related............................................................................... 7-15 7.1.4.4 Tubing punching or perforating............................................................................... 7-15 7.1.4.5 Sick line well interventions ...................................................................................... 7-18 7.1.4.6 Intelligent or Digital Slickline Services ..................................................................... 7-20 7.3 Coiled Tubing Operation ........................................................................................................ 7-22 7.3.1 Coiled Tubing Main Parts ................................................................................................ 7-22 7.3.2 Rig-up and Rig-down for CT Operation........................................................................... 7-27 7.3.3 RIH and POOH with CT .................................................................................................... 7-27 7.3.4 Cementing with Coiled Tubing........................................................................................ 7-29 7.3.5 Acid stimulation with CT ................................................................................................. 7-33 7.3.6 Killing, Circulation and Clean-out the Well with CT ........................................................ 7-35 7.3.7 Drilling, milling and under reaming with CT ................................................................... 7-35 7.3.8 TCP under balanced perforation with use of CT............................................................. 7-38 7.3.9 PLT logging with CT ......................................................................................................... 7-39 7.3.10 Running plugs, retainers and packers with CT................................................................ 7-40 7.4 Nitrogen Operation ................................................................................................................ 7-40 7.4.1 Nitrogen Pumping Unit ................................................................................................... 7-41 7.4.2 Use of Nitrogen ............................................................................................................... 7-42 7.4.2.1 Well lifting and livening ........................................................................................... 7-42 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS 7.4.2.2 Foam acid or foam cement operations.................................................................... 7-43 7.4.2.3 Underbalanced perforations.................................................................................... 7-43 7.4.2.4 Well protection or pressure testing......................................................................... 7-45 7.5 Snubbing Operation ............................................................................................................... 7-45 7.5.1 Rig-up and Rig-down for Snubbing Operation ................................................................ 7-53 7.6 Wireline Logging..................................................................................................................... 7-54 7.6.1 Rig-up and Rig-down ....................................................................................................... 7-55 7.6.2 Type of WL Operations and Interventions ...................................................................... 7-57 7.6.2.1 Logging (Wireline or TLC) ......................................................................................... 7-57 7.6.2.2 Running and Setting Permanent Packers ................................................................ 7-57 7.6.2.3 Perforating ............................................................................................................... 7-58 7.6.2.4 Tubing Punching or Cutting (Explosive or Chemical) ............................................... 7-58 7.6.2.5 Production logging tools (PLT) ................................................................................. 7-59 7.7 Operation in sour environment ............................................................................................. 7-59 Appendix 7-A Common WL Tool Combinations ............................................................................. 7-60 List of Figures.................................................................................................................................. 7-67 List of Tables ................................................................................................................................... 7-69 References ...................................................................................................................................... 7-70 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 7. TECHNOLOGICAL OPERATIONS EXECUTIVE SUMMARY EXECUTIVE SUMMARY: 7. TECHNOLOGICAL OPERATIONS No. Strongly Recommended 1. Use double drum SL unit when performing complex, heavy S/L operations (for example swabbing, fishing…) 2. To collect all relevant well information before proceeding to S/L job planning and execution. 3. Before RIH with S/L tool calculate ZERO depth; adjustment to the original RKB depth. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Prior RIH with S/L plug or similar large OG tool, there is mandatory to perform the gauge ring run. Perform nipple brushing operation in case having scale or paraffin in the area of landing nipple. If performing extensive S/L, W/L or CT operations across the TRSCSSV install a protection sleeve to protect the safety valve internal from wear and damage. If running tubing swaging tools, run them always with up-stroke jar; it will prevent swaging tools to be stuck. Always assure that S/L, W/L or CT material is compatible with actual well conditions (especially in sour environment). Set up CT minimum weight indicator before RIH with CT; also perform necessary CT calculations and set up the maximum pull on the system (80% of CT yield or of the safety separation joint tension). Before RIH CT, it is good practice to perform a drift run with S/L or W/L. Run pull test on every 1000m while RIH with CT (or even more frequently). Compare weight indicator readings with hydraulic pressure to verify the readings accuracy. Isolate the zone of future interest, if performing cement operation above those; use highviscosity pill, sand, silica etc. material. Use fluid spacers before and after cement slurry; before cementing measure the CT volume by flushing it over with sponge. For matrix stimulation by CT, keep the pressure across pay-zone below the formation fracturing pressure. Before pumping acid into CT, it is good practice to pump some corrosion inhibitor (10-20lit). http://www.petrom.com 7-1 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS EXECUTIVE SUMMARY: 7. TECHNOLOGICAL OPERATIONS No. Not Recommended at All 1. Never run in hole with S/L, W/L or CT made of standard carbon steel, if the well has H2S or CO2. 2. Never RIH with S/L or W/L without lubricator and BOP assembly installed. 3. Never pool out tubing with tandem plugs in place, without hot taping the space between the plugs; high pressure can be trapped between the plugs and may cause severe injury. 4. Never run LIB twice to TD; take imprint only ONCE! 5. 6. 7. 8. 9. 10. 11. 12. 13. 7-2 CT welding on the well site is not recommended; it significantly reduces the CT tensile strength and thus should not be done. Never space CT or N2 units on downwind direction from the well. Also never place them too close to the well. Never hammer chicksans connections under pressure, if leak observed; first release the pressure, than tighten the connection. Never run in hole CT with no BHA (without no-go!) at the end of the CT. If it must be done, than get written approval from Company for it. Assure alternative methods for positive indication when the end-of-CT is approaching stripper or stuffing box. Never use stripper rubbers of non-certified suppliers or out of required specification. Never minimize chain tension on the high pressure or snubbing operation mode. Keep tension in the chain(s) and avoid slipping. Never perform CT cementing operation without obtaining firstly TD, Temp and ID data by wireline. Never bullhead acid on producing oil or gas wells; rather use CT for spotting the acid downhole, as close as possible to the targeted zone. Never fully close the X-mass tree adjustable choke when bleeding down high gas rates; keep it minimum opened; use the wing valve or the manifold valve to seal off the flow. Note that adjustable choke is not designed for keeping the pressure, but for regulating the flow. http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 7. TECHNOLOGICAL OPERATIONS 7. TECHNOLOGICAL OPERATIONS Essential part of the WO operations is technological operation with aim of assisting and successfully completing the WO job. Technological operations are reducing the cost of WO operation, improving safety and efficiency. 7.1 Overview of Technology Operations in Wells (Slickline, Coiled Tubing, Nitrogen Unit, Snubbing, Wireline and Production Logging) The following technologies and techniques are considered as technological operations in WO and well completion operations: • Slick line operations, • Coiled tubing operations, • Nitrogen pumping operations, • Wireline and production logging operations and • Snubbing technology. 7.2 Slickline Operation Slickline service is a mobile oil and gas industry service that offers an array of downhole tools to aid in the manipulation of oil and gas wells; for a variety of services from routine oil well servicing to emergency well control. Slickline service uses a single solid-stranded non-electric (*with exemption of latest developments in SL technology) cable, known as slickline. The slickline is secured to the slickline unit, passes through a stuffing box and pressure control equipment mounted on the wellhead, as shown in Figure 7-1. The slickline is used to run, set and control downhole equipment such as tools, recorders, plugs or flowcontrol equipment. Appropriate and safe slickline service can maximize the potential of a well and can increase safety for other third-party services. Slick line operations are low cost operations, relatively fast moving slick line saves time and cost during the WO operations. Due to the low load bearing capacity of the slick line, these operations are limited in terms of weight of deployed tools and over-pulling forces on the line. Slickline technology is mainly used for the following applications: • Tagging the bottom of the well (the furthest depth possible to reach down the wellbore). • Gauge ring runs (running a special sized downhole tool designed to prove the tubular internal diameter). • Broach tubing (a tubing broach looks like an aggressive, tubular file, available in different diameters, used for removing burrs and crimps in the inside of tubing and casing in oil and gas wells). • Sand & debris bailing (sediments removal from the bottom of the well). • Shifting sliding door sleeves (shift to open or shift to close). • Setting or pulling downhole plugs and flow control devices. http://www.petrom.com 7-3 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS • • • • • • • • Locking open (temporary or permanently) tubing retrievable surface controlled subsurface safety valves. Installing or pulling gas lift valves or dummies inside side pocket mandrels. Deployment of bottom hole pressure and temperature measuring gauges. Running production (memory mode) logging tool in flowing wells. Fishing operations (limited to ‘light fishing’). Paraffin or asphaltenes cutting (scrapping / cleaning the inner wall of the tubing). Chipping hydrates (ice) or scale deposits. Perforating holes in the tubing wall (tubing punching). Figure 7-1 Slickline operation on wellsite IRP 13 is a guideline intended for slickline service companies to develop an appropriate slickline service program that promotes slickline worker safety on the job. IRP 13 includes pertinent information about slickline safety, including the following: slickline service company responsibilities, workers’ responsibilities, owner responsibilities, well control, operational procedures, equipment 7-4 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 7. TECHNOLOGICAL OPERATIONS maintenance and training. IRP 13 supplements existing standards and regulations, and provides guidelines and recommendations where none previously existed. 7.1.1 Slickline Equipment and Tools The slick line system is assembled from the following main components: • Slick line units including drive unit, drum with slick line and operator’s commands. The slick line unit can be of different type and construction; in most cases it is a light compact unit which can be easily moved or transported. S/L unit allows for safe and accurate manipulation of the S/L equipment and tools, data monitoring and protection from elements. Picture below (Figure 7-2) is just illustration of a compact S/L unit. Figure 7-2 Slickline unite Slick line is the key component of the S/L technology; the link between surface unit and bottom hole tools. Following tables summarize the diameter (Table 7-1), metallurgy and application areas (Table 7-3) for the most commonly used slick lines. Table 7-1 Slickline diameters Slickline Diameter Inches Milimeters 0.660 1.676 0.720 1.829 0.920 2.336 0.108 2.743 0.125 3.175 0.140 3.556 0.150 3.81 0.160 4.064 0.188 4.775 http://www.petrom.com 7-5 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 7. TECHNOLOGICAL OPERATIONS Table 7-2 Recommended slicklines, materials and their breaking strengths (in lbs) Materijal 0.066 0.072 0.082 0.092 0.105 0.108 0.125 811 961 1239 1547 1966 2109 2822 958 1149 1460 1828 2329 2455 3190 - - - 1363 1732 1786 2270 Super Austenitic Sandvick Sanicro Stainless Steal - - - 1445 1885 1995 2675 6 Moly Stainless Steel Avesta 254SMO Bridon Supa 75 Bridon Supa 80 - - - 1462 1550 1625 1818 NA NA 1924 2030 2775 2454 2560 2775 Cobalt Base Alloy MP35N - - - 1582 2009 2080 2724 Bright Steel (Brigth steel (API Level 3 or a Improved Plow Steel) 230ksi Bright steel (monitor AA or HI strength) 260ksi Carbon Steel Austenitic Stainless Steal 316 Stainless Table 7-3 Slickline metallurgy and applications Wireline H2S C02 Satisfactory in low concentrations, inhibitors can be highly baneficial May be used at low concentration, but inhibitors are not always effective. Better if water is not present Hight strength Carbon Not recommended at any concentration, even with inhibitors Not badly affected by Poor even at low Chlorides but must be concentrations. washed and oiled after Inhibitors have a little Not suitable use to prevent effect. Better if water corrosion while on the is not present reel GD316SS Normally satisfactory at Normally satisfactory at concentrations up to concentrations up to 30% 30% Vulnerable in concentrations in excess of 3%. Avoid prolonged high loading GD31MO Not normally affected at any concentration Not normally affected at any concentration API9A Not normally affected at any concentration Chloride ZnBr2 Not badly affected by Chlorides but must be washed and oiled after Not suitable use to prevent corrosion while on the reel Not affected For some special operations there is a braided line (wirerope) used instead of slick line; thus some slick line units have double drums: one for slickline and one for braided line. Slick line interventions where braided line is used are swabbing, bailing, fishing or similar. 7-6 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 7. TECHNOLOGICAL OPERATIONS • Wellcontrol system For safe and reliable S/L operation well control is maintained by deployment of primary, secondary (or even tertiary) mechanical pressure barriers. Primary barrier during the S/L operation is the stuffing box on the top of the lubricator assembly, the secondary barrier are blow out preventers (BOP’s), while the third barrier can be either additional BOP or valves of the x-mass tree (master or swab valves). Well control barriers are operated by special hydraulic operating system. Figure 7-3 Stuffing Box and a Mono-Block slickline BOP stack Figure 7-4 S/L BOP Operating system and Control Panel • Depth & Weight Indicator Since invention of the slick line technology many different systems have been designed for accurate measurement of the slick line up & down movement, as well as to monitor and control the slick line tension. Here below is a simply depth & weight mechanical indicator shown; modern S/L units have fully digitalized, much more sophisticated systems for depth and weight recording and controlling. http://www.petrom.com 7-7 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS Figure 7-5 Slickline weight and depth indicators (mechanical) • Data acquisition system Modern S/L units are connected to laptops; thus full range of parameters are continuously monitored and recorded in electronic form. This all improves the S/L operation efficiency and reliability. This is especially important with deployment of modern, ‘smart’ slickline technologies (like SLB ‘Digital Slick Line’, or ‘e-Slick Line’ technologies) • Lubricator system with stuffing box and seal energizing system Lubricator system is used for deployment of downhole tools on a live well or under pressure conditions; lubricator is thus essential part of the well control system. Length of the lubricator assembly is dependent on the length of the deployed downhole S/L tools. Lubricator system is a combination of different tools and equipment spaced between the stuffing box and S/L BOP stack. The complexity of the lubricator system depends on the type of the S/L operation, pressure and working environment conditions, etc. Figure 7-6 S/L Lubricator system packed for offshore loading 7-8 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 7. TECHNOLOGICAL OPERATIONS Figure 7-7 Illustration of wide variety of components used for S/L lubricator system http://www.petrom.com 7-9 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS • Test Pump As the S/L surface system is made of different components (made-up together), it is very important to check the pressure integrity of those connections and itself the lubricator bodies. Hydraulic pump (either hand or air driven) is used for S/L equipment pressure testing purpose. Pressure testing data are recorded either on pressure recording charts or as electronic logs. • Slick line tool box or workshop container Each S/L operation requires certain tools and equipment; some of those tools are possible to plan or secure in advance, during planning phase of the S/L operation. But there may be situations when S/L operation is diverted into direction which was not planned or forecasted; even in these situations, some basic ‘emergency’ tools & equipment should be available on the wellsite. Also there are lot of small repairs and adjustments needed to be performed during the execution of S/L operation; for these purposes a special S/L workshop (container), with necessary tools is set up and is part of the S/L package. Here below (Figure 7-8) is one of these S/L workshop containers just as illustration. Figure 7-8 Slickline tool box 7.1.2 Slickline Job Planning and Preparation A safe and efficient S/L operation needs accurate and complete information for planning the job. Slickline service provider has to collect specific data from customers at the time of the job request to make appropriate equipment selections and provide operators information pertinent to a safe work environment. It is recommended at a minimum the following data to be collected: • Job task request, • Customer contact information, • Well location (L.S.D. well legal name), • Directions to the jobsite, • Well type (sweet or sour), • Well head connection, • Potential pressure, 7-10 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 7. TECHNOLOGICAL OPERATIONS • • • • • Downhole schematics, Downhole conditions, Billing information, Type of slickline unit(s) needed, and BHA profiles. 7.1.3 Rig-up and Rig-down Only slickline personnel must rig up slickline equipment unless other services assisting in rig up are informed of potential equipment and procedural hazards. The wellbore may be accessed through the internal threads of the wellhead, drill pipe on the drilling rig, adaptor flange or rig BOPs. Rig up procedures are company-specific, but should include the following activities: • • • • • • • • • • • • Spot the slickline truck or skid. Lay out surface pressure equipment. Inspect equipment for damage. Prepare slickline unit for work. Prepare downhole tools and accessories. Take surface pressure readings from the wellhead (casing and tubing). Assemble slickline downhole tools and surface pressure equipment. Prepare the wellhead for S/L operation. Assemble the slickline wellhead adaptor. Use lifting equipment to raise surface pressure equipment over the wellhead adaptor. Calculate elevations and zero the counter and tool string before entering the wellbore. Perform all necessary pressure testing operations prior to commencing the RIH with S/L. Surface pressure is controlled through a series of specifically designed pressure-rated devices that contain, direct or control the flow of pressure to allow it to be managed in a safe manner. Hand unions are the most common way to connect surface pressure control equipment. They are sized, pressure-rated and have an o-ring seal. Pressure control equipment can vary in pressure ratings. Metallurgy can vary to accommodate sweet or sweet/sour applications. For slickline services surface pressure control equipment starts with a wellhead adapter and works up the assembly depending on the service needed downhole. Pressure control equipment may be lifted with the aid of a crane or picker, by mechanical winch or drilling/service rig lifting devices. During rig up operation all lifting related safety and personal protection measures must be applied as per Company standards. Slickline service personnel must also wear appropriate free-fall protection devices when climbing on lifting devices in use (e.g. the ‘ginpole’). A typical S/L rig up is illustrated on the slide below (Figure 7-9). S/L ZERO depth adjustment and calculation: Before entering the wellbore, it is important to calculate elevations and zero the S/L counter. Most downhole tubing and equipment elevations are shown on well schematics as distance from Rotary Kelly Bushing (RKB depth). Slickline measuring system and counter need to be adjusted for accuracy while at surface, before run in hole - commonly referred to as 'zero depth'. To 'zero' the S/L counter, the bottom of the tool string is lowered to the casing flange, or ground, and the measuring device is set to zero meters; as it is illustrated in the figure below (Figure 7-10). http://www.petrom.com 7-11 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS Figure 7-9 Slick line equipment rigged up and ready for deployment; note the three well control barriers in green text Figure 7-10 Calculation of RKB Vs CF or GL elevation 7-12 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 7. TECHNOLOGICAL OPERATIONS 7.1.4 Type of Slickline Operations and Interventions Slick line operations are most frequently categorized based on the downhole tools deployed during execution of the S/L job. The following groups of slickline tools are available: • • • • • • • Running tools, used for deployment and placement of special down hole tools and equipment. Pulling tools, used for pulling and retrieving tools & equipment from the well. Shifting tools, used to shift open or close down hole flow control devices. Jars and accelerators, for intensifying the pulling/pushing force. Tubing punchers (establishing flow communication between tubing and casing annulus). Paraffin cutters and scrapers. Special service and surveying tools. Here below is description of the most common slick line operations and best practices related to those. 7.1.4.1 Gas Lift related (Side pocket mandrels and GL valves) Side Pocket Mandrels provide a means of injecting gas from the casing-tubing annulus to the tubing. They are installed in the completion string and act as receptacles for the following devices: gas lift valves, dummy valves, chemical injection valves, circulating valves, differential dump/kill valves, equalizing valves, etc. Figure 7-11 a) CAMCO MMG side pocket mandrel, b) GL well completion and operation of the kick over tool http://www.petrom.com 7-13 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS 7.1.4.2 Flow control devices operated by slick line Slickline technology can be used for operating or deployment of different flow control devices, such as sliding sleeve doors, plugs, retainers or others. The most common use is shifting open/close the sliding door on Otis, Baker, Camco, or other manufacturers SSD’s; see the drawing below (Figure 7-12). Figure 7-12 Sliding sleeve door Another wide range of application is installing bridge plugs, downhole plugs with prongs and check valves by using slick line. To prevent downhole plug leaking use a gauge ring to ensure nipple depth and tubing is clear of obstruction. When tubing is suspected of containing debris, a nipple brush may need to be run through profiles. After isolation plug(s) are in place, it is recommended to pressure test the plug in both directions; first bleed pressure off and observe the well to ensure downhole seal integrity and no inflow through the plug; following it pressurize the tubing from above and observe a stable pressure test. If there is a leak in the plug/seal, POOH and repair accordingly. Downhole well conditions may in some cases determine the need for dual barriers. There are risks associated with using dual barriers. In the situation where the dual barrier consists of two plugs and the tubing containing the plugs has been brought to surface, pressure may be trapped within the tubing, between the two plugs. This pressure must be released prior to handling the tubing on surface, as this trapped pressure creates a potentially fatal hazard. One of the ways for pressure release on surface in these cases may be hot tapping. A slip stop may be used on top of a profile plug as a backup safety measure to prevent the profile plug from moving up the tubing. The slip stop does not provide an additional barrier to trapped pressure but simply prevents the profile plug from being ejected from the wellbore. It is not recommended to use a slip stop on top of a bridge plug as jarring down to set a slip stop may cause the bridge plug to dislodge and, if under enough pressure, come to surface. When setting the bridge plug, it is suggested to follow manufacturer's specifications for backup safety measures. 7-14 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 7. TECHNOLOGICAL OPERATIONS The table below (Table 7-4) is the summary of downhole plugs requirements for different pressure containing operations in/on the well. Table 7-4 Downhole plugs requirements for different pressure containing operations in/on the well Holds Holds Holds pressure pressure pressure from both from above from below directions Repair surface equipment Test tubing by bleedeng down Test tubing by pressuring up Snubbing tubing in or out of well Set hydraulic packer Circulate above with fluids Zone separation in selective completion Fracturing selective completions Kill well Move rig on or off location Use as standing valve Packer test Acidizing on selective completion Wellhead plugging on completions Wellhead plugging on remedial work x x x x x x x x x x x x x x x x x x x x x x x x 7.1.4.3 Subsurface safety valve related Slick line is used for assisting the subsurface safety valves installation or manipulation. Wireline retrievable subsurface controlled safety valves (WRSSCSV) are set and pulled by use of slick line. Tubing retrievable subsurface controlled safety valves (TRSSCSV) can be protected by sleeve or locked out (temporary or permanently) by running & installing lock out sleeves using slickline. 7.1.4.4 Tubing punching or perforating When the call is for a communication port between the production tubing and the annulus, the fastest and most economical way to open a port in the tubing wall is to deploy some kind of tubing punching by use of slick line. The slick line puncher (perforator) can be purely mechanical one, when slick line jarring action is used for punching the hole in the tubing wall. Another type of the http://www.petrom.com 7-15 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS perforation is to use mechanical puncher tool but this time to use a small capsule of propellant to stroke a mechanical punch through the wall of the pipe; these tools are known as ‘Kinley’ tubing perforators. In both cases the punch creates a hole of desired diameter and the punching knife is by default withdrawn back from the tubing wall, to allow for free pull out the tool to the surface. In either case, there is no damage to the casing beyond the limited stroke of the punch action. On the slides below are the two types of tubing puncher as illustration of these types of slickline tools. Figure 7-13 Tubing punchers – propellant driven and mechanical ones The electromechanical tubing puncher is conveyed into the well using a standard slickline tool string. The downhole power unit (DHPU) has an onboard timer that is preset on surface prior to running into the well. Once the slickline deployed electromechanical tubing puncher is at the target depth where the tubing is to be punched, the tools are held static and the preset time is allowed to lapse. As soon as the preset time has lapsed, the DHPU will activate. This action punches the hole with no manipulation of the wire required. When the tool has completed the punching cycle, the tools are recovered from the well with no jarring required. The tool is shown here below (Figure 7-14). 7-16 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 7. TECHNOLOGICAL OPERATIONS Figure 7-14 a) The electromechanical downhole power unit; b) The electromechanical tubing punch in the “ready-to-run” position; c) The electromechanical tubing punch in the “blade-extended” position (max. position extended, which cuts through the tubing wall and creates a hole in tubing); d) The electromechanical tubing punch in “fully-retracted” position after the hole has been cut (The tool is ready to travel back up the hole) Tubing perforators & punchers are most commonly used in following cases: • Circulate and kill a well. • Install inexpensive gas lift or chemical injection. • Circulate out annular sand bridges. • Open injection point for retrievable pack-off gas lift valves. • Operate plunger-lift installations. • Open alternative zones when sliding sleeves cannot function. • Drain tubing to prevent pulling wet string. Kinley Sandline Cutter The Sand Line Cutter is designed to allow the recovery of wireline, slickline and electric line when the attached toolstring is stuck in the well and pulling out of the rope socket may not be possible. It will cut any wireline up to 1-1/8" including control lines, drilling lines and power cables. It can be initiated by a drop bar or an electronic timer. It assembles over the line and is recovered with the cut line. Functionally, the line is cut mechanically by a cutting edge driven by a contained explosive force, initiated by an electronic timer rather than a drop bar. With the timer, there is no more guessing http://www.petrom.com 7-17 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS whether or not the drop bar has reached the firing pin. The tool is also designed to save a fishing trip by crimping on to the end of the cut line, allowing the cutter to be recovered with the freed line as it is pulled out of the hole. Figure 7-15 Kinley sand line cutter 7.1.4.5 Sick line well interventions Gauge Cutter Operation Gauge cutters are run in hole before running sub surface equipment. Gauge cutters are used to check if sub surface equipment can pass freely through tubing, that there are no obstructions and to locate top of the landing nipple. The bottom of the gauge cutter is suitable to cut paraffin, scale and any other obstacles in tubing, if found. Blind Box Operations Blind boxes are used when heavy downward jarring is required to dislodge a fish or push something down the hole. Bottom surface of Blind Box is flat and hardened to reduce wear and damage to it. Impression Block Operations Lead impression blocks are used during fishing operations to check the shape / size of the top of the fish and to determine tool appropriate for fishing operation. Lead is filled within body of impression block and a pin is fixed thru body of impression block & lead, to secure the lead within body. Magnet Runs Operations Fishing magnets are used to remove small pieces of ferrous metals from top of tools and also to retrieve metallic scales or particles after milling/wash-over operations. 7-18 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 7. TECHNOLOGICAL OPERATIONS Nipple Brush Operations Tubing broach is used to clean the landing nipples and prepare those for accepting and landing in the plugs. Tubing broach is also used to remove scale, rust etc, from tubing I.D. Paraffin Scratcher Paraffin Scratchers are used to clean the paraffin deposition on the ID of tubing, nipple profile etc. Tubing End Locator Tubing end locators are used to locate end of tubing during completions. With its spring loaded finger, it can be run in various sizes of tubing. Pressure and temperature measurement using memory gauges Wide range of downhole pressure and temperature recording gauges can be deployed by use of slick line. Memory gauges can be landed in landing nipple profiles and left there for certain period of time; or just simply hanged gauge on slick line while measuring P/T (short measurements). Bottom hole sampling operations Weatherford’s Electronic Programmable Sampler Tool is used to obtain PVT quality samples from the well bore. The tool is designed to have full flexibility in operations and is run in conjunction with Weatherford’s Electronic Shut-In Tool and Electronic Gauges to provide an integration tool that forms a complete programmable downhole production test system. Tubing Swage Operations Tubing Swages are used to remove large obstructions and restore light collapse in the tubing. This allows smooth running of tool string in well bore. The OD of tubing swage should be equal to tubing drift ID. It should be run with up stroke jar to enable operator to take it out of tubing if swage is jammed Bailer Operation Sand pump bailers are used when a sand bridge is encountered during operations. The bailer pulls sand into cylinder by slickline up-down action, carrying it to surface and thus removing sand bridge. The pump bailer is used to remove the bulk of sand above the wireline tools / equipment or to clean filters. Another type of bailers are hydrostatic bailers, which consists of a chamber sealed at atmospheric pressure. When the bailer reaches the top of the sand and is jarred down, a shear disk is ruptured and the bottom hole pressure surging into the chamber sucks up the sand. A ball check in the bottom serves to trap the sand in the chamber. Hydrostatic Bailer is used in situation where pump type bailers are not effective. Dump bailers are used to spot chemicals, such as acid, methanol, solvent etc, downhole. The tool locates on top of a preset lock mandrel, downward jarring shears the retaining pins and allows for release of the chemicals from the chamber. http://www.petrom.com 7-19 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS Slickline Fishing Operations. Fishing is the name given to the operation to retrieve items from the well which may be damaged, stuck or have been dropped. Slickline fishing is relatively limited in terms of the pulling force you may generate on the fish, but is fast and very economical way of ‘light’ fishing. Here is the list of tools found in a standard slickline fishing toolbox: • Wireline Clamp, • Wireline Grab, • Wireline Finder, • LIBs to suit tubing sizes, • Blind Boxes to suit tubing sizes, • Heavy duty pulling tool, • Wireline cutters, • GO-Devils, • Overshots, • Bell Guides to suit tubing sizes, • Power jars and • Tubular jars. 7.1.4.6 Intelligent or Digital Slickline Services Recent developments in materials, independent power sources (batteries), data transmission and electronics have allowed evolution of standard slick line services into the direction of ‘intelligent’ slick line services. Schlumberger’s ‘e-Fire’ slickline technology is based on pre-programmed hydraulic impulses to initiate perforation. Standard wireline gun is attached to the ‘e-Fire’ tool and ran into the hole. When at required depth, the toll is moved up & down as per pre-programmed schedule. Hydraulic impulses generated with toll movement up & down in certain time intervals will armed and following it initiate detonation of the gun. Shooting sequence can be stopped any time by simply deviating from the predetermined pressure/time impulses. The ‘e-Fire’ perforating technology has it’s own advantages compared to standard wireline perforating (cost, radio silence, overhead power lines, etc). Schlumberger’s ‘Digital Live Slickline’ services are a platform based slickline technology which enables well interventions with grater scope, control and certainty. Key feature of digital slickline is that slickline itself becomes electrically insulated conduit by a special coating applied to standard slickline. Platform is based on core equipment combined with five different modules; those are: ‘LIVE-Act’ – digital slickline mechanical services; example is mechanical jarring with fully controlled jar action, or the digital controlled release tool. ‘LIVE-Seal’ – digital slickline sealing services; example is the ‘Geolock’ retrievable mono bore lock mandrel with non-elastomeric seals. ‘LIVE-Set’ – digital slickline setting services; running and setting plugs and retainers on digital slickline. The actuator uses hydraulic pressure from the battery powered hydraulic power unit. ‘LIVE-Perf’ – digital slickline perforation services; perforating, tubing punching, pipe cutting operations. 7-20 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 7. TECHNOLOGICAL OPERATIONS ‘LIVE-PL’ – digital slickline production logging services; deployment of high quality PLT sensors on digital slickline and use of surface read outs to accommodate the PL operations according to reservoir conditions. Below (Figure 7-16) is the SLB ‘LIVE Digital Slickline Services’ platform schematic with basic tools. Figure 7-16 Schlumberger ‘LIVE Digital Slickline Services’ platform http://www.petrom.com 7-21 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS 7.3 Coiled Tubing Operation Coiled tubing (CT) technology deploys a long one-piece (coupling-less) tubular for performing downhole operations and well interventions. CT technology is fast and effective way of well intervention and downhole remediation during work over jobs. There are two basic groups of CT operations; one group is when CT is used for circulation and pumping purposes, while another group is when CT is used as a conveyance string for deployment of different downhole (working) tools. CT technology can be deployed in any well type, regardless of the well depth, deviation and wellbore geometry & size. Wide range of downhole CT equipment and tools are available for performing different CT operations. There are certain limitations and restrictions when deploying the CT technology, in regards of pulling/pushing forces, pressure & temperature conditions and working (downhole) environment parameters. CT technology can be used as a standalone, but more often it is used in combination with standard work over rig or drilling rig operation, or to enhance certain pumping and stimulation services. Figure 7-17 Rigless and rig-assisted CT Operations 7.3.1 Coiled Tubing Main Parts In the text below is the short description of CT technology main parts, illustrated with some photos and sketches: Coil (Coiled tubing) The Coil is a seamless one-piece metal tubular, with given OD and ID, manufactured from different steel alloys to suit working environment and withstand working pressures & loads. Thus on the market are available coils in different outer diameter, wall thickness, mono size or tapered string, different pipe yield strength, different metal choices and different length. 7-22 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 7. TECHNOLOGICAL OPERATIONS Diameter of the coil can be between ½” and 4-½”, but most commonly used sizes are 1- ¼”, 1-½”, 1¾” (often referred as CT workhorses). If the CT string is tapered, the taper is mainly on the I.D. The taper can be butt-weld (junction weld is in flat strip) or bias-weld (junction is with offset well ends). The weld can be factory or field made. The field welds are always to be butt-welds; this weld can decrease the CT tensile strength by 50%, or even more. Thus, field welds should be avoided whenever possible. For difference in butt- and bias-weld see Figure 7-18 . Figure 7-18 Difference between in butt and bias weld Coil material is available in different yield strengths, but modern coils used are with 100+K Psi values. Material composition of CT coil depends on strength, ductility, corrosion resistance, service life and cost requirements. Alloys used for manufacturing coil have different content of steel, Carbon, Chromium, Nickel, Cooper, Molibdum, Cobalt or similar. Rockwell hardness of these alloys is between 20 and 28 HRC. In general, high strength CT lasts longer and is more fatigue resistant, but hard material is less usable in sour well environment (sulfide cracking & embrittlement). Always ask for CT contractor’s confirmation that CT will suite the actual well conditions & environment. Here below is a table with some CT records in terms of application areas and conditions. Table 7-5 Some CT Records World Wide CT Records Largest CT in Use 3-1/2" 88.9 mm Max Depth 24,000' 7315.2 m Max Horisontal 17,000' (80deg)-Wytch BP 5181.6 m (80deg) Longest BHA 1500' - perf guns -UK 457.2 m -perf guns- UK 23,000' of 2-3/8" 7010.4 m of 2-3/8" Longest String 28,000' of 1-1/2" 8534.4 m of 1-1/2" Max Wellhead Pressure 9800 psi 675.7 bar Max Deployment Press 4500psi 310.2 bar Max BH Temp 700F- Mex, 780F Japan 371.1C°-Mex, 415.5C°-Japan Max Acid at Temp 28% at 280F in Dubai 28% at 137.7 in Dubai 75% in Greece 75% in Greece CT in H2S 98% /300F- Gulf of Mexico 98% / 148C° Gulf of Mexico (String used one time) (String used one time) CT in CO2 15% (string ruined) 15% (string ruined) http://www.petrom.com 7-23 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 7. TECHNOLOGICAL OPERATIONS CT Reel The reel is used for spooling onto the coiled tubing and connecting it to the CT pumping manifold. The reel is part of a special frame which can be skid-, track-, trailer or boat-mounted, for easier transport and on/off-loading. For logging purposes there is a special CT logging reel with electrical conduit inside the tubular and fitted with electrical swivel & collector. On the (Figure 7-19) is the sketch of a CT frame and the coiled tubing connection to the pumping manifold (sketch and photo from WF CT unit in Romania. Figure 7-19 Coiled tubing connection to pumping manifold Power Pack System The power pack is a diesel engine driven set of hydraulic pumps generating necessary hydraulic power to operate the CT unit and it’s components. Power pack is in most of cases a separate skid mounted unit, as shown on the photo below. Figure 7-20 Power pack system 7-24 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 7. TECHNOLOGICAL OPERATIONS Component Controls There are three main component controls of the CT unit; those are coil spooling system, coil injector head system and the well control system. Controls and instruments are all located on the CT control panel, inside CT operator’s cabin. The principal gauges are wellhead pressure gauge (displays pressure outside of the CT, at the BOP pressure port), circulating pressure gauge (displays pressure at the reel-manifold pressure sensor), weight indicator (displays weight exerted by the CT tubing on the injector head) and the depth indicator (displays the depth of the CT (BHA) end relative to the reference (zero) depth. The control panel looks as shown on the photo below (Figure 7-21). Figure 7-21 Control Panel Injector Head The CT injector head is made from two sub-systems: the principal components and the support system. Parts of the principal components are drive & brake system, chain assembly, traction and tension system and the injector guide arch assembly. Secondary (or support) system is made of weight indicator, depth sensor mounts and the stripper mount. The injector drive system is made of two or four hydraulic motors, the gear system, chain sprockets and control valves. Some motors may have high/low gear options, for enhanced efficiency of the CT injector. CT brake system is a fail-safe braking system (hydraulic pressure is required to release the brake). Well Control Equipment Well control equipment are used for well control purposes. CT unit has it’s own blow out preventer stack assembled as a one-piece device for easier rig up and rig down. WO or drilling rig BOP system could be used as additional well control system to make easier well operation. Here below is a typical CT BOP configuration with CT and Rig BOP systems. http://www.petrom.com 7-25 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 7. TECHNOLOGICAL OPERATIONS Figure 7-22 Typical CT BOP configuration Table 7-6 CT Primary well control system PRIMARY WELL CONTROL SYSTEM is defined as folows: External Well Control Equipment Internal Well Control Coiled tubing Dual stripper Coiled tubing body (string) End connector One dual chack valve in BHA Alternatively- plugged end of coiled tubing X X X X X Table 7-7 CT Secondary well control system SECONDARY WELL CONTROL SYSTEM is defined as folows: External Well Control Equipment Coiled tubing One combined shear/seal ram One pipe ram One slip ram Minimum one kill line inlet Minimum one manual gate valve and/or plug valve on the kill line and minimum one remote hydraulic operated gate and/or plug valve. Alternatively remote valve can be replaced with one manual valve and chack valve. 7-26 X X X X X http://www.petrom.com Internal Well Control 2012 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 7. TECHNOLOGICAL OPERATIONS 7.3.2 Rig-up and Rig-down for CT Operation Rig-up a CT unit is a procedure of putting together, pressure and functional testing of all components and preparing the CT unit for safe operation on the wellsite location. Rig-down is disassembling and demobilization of the CT unit from wellsite location. Company policy, safety regulations, sound engineering practices and common sense must be exercised in the execution of all procedures while R/U or R/D. These operations involve lot of heavy lifting and high pressure testing what makes personnel protection and safety crucial in every moment of R/U or R/D operations. CT unit can be rigged up as a standalone unit on the top of the x-mass tree, or as part of the WO operation (rig assisted CT). Of course it all can be done onshore (land) or offshore (platform). CT unit and all auxiliary equipment should be placed upwind or crosswind from the well. Distance from the well to the CT reel must be sufficient to allow proper angle between CT section s upstream and downstream of injector head & gooseneck. Connect all hydraulic lines to the coiled tubing reel, power pack, control cabin, BOP and injector head. Rig up treating iron from the pump unit to the coiled tubing reel, with securing the line where necessary and pressure test the line against the reel valve as per maximum expected pressure. All pressure tests must be recorded and saved in hard copy (pen-charts) or in electronic form. After completing the rig up proceed with BOP system testing as per CT service provider and per Company policy & standards. Figure 7-23 Proper rig-up of the CT reel and injector head 7.3.3 RIH and POOH with CT Most coiled tubing operational failures can occur when running coiled tubing in the hole. The most likely failure is due to buckling when the tubing hits some object or catches on a change of diameter. The potential for buckling is a function of the coiled tubing diameter, wall thickness, fluid flow, BHA size, and the ID of the tubing or casing that the coiled tubing is being run into. It could be set up a minimum weight indicator reading allowable while running in the hole using hand calculations or special CT software up. The maximum running speed in hole for normal operation shall be 30 meters per minute (100 feet/minute). The maximum running speed is to be reduced to 3 meters per minute (10 feet/minute) when running through restrictions and when entering into a liquid. This reduced running speed shall be applied for 15 meters (50 feet) before and 15 meters (50 feet) after the position of the downhole restriction or the liquid level to allow for any discrepancies in depth readings. http://www.petrom.com 7-27 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS Pulling out of hole speed is not as critical, but shall be limited to a maximum of 30 meters per minute (100 feet/minute). The same speed reductions are to be applied when pulling through restrictions. Pulling out of hole speed shall be reduced to 10 meters per minute (30 feet/minute) when within 100 meters (300 feet) of the wellhead or BOP, 5 meters per minute (15 feet/minute) when within 50 meters (150 feet), and 2.5 meters per minute (8 feet/minute) when within 25 meters (75 feet) until the end connector contacts the stuffing box Prior to running coiled tubing in the hole, the supervisor will have the following information available: • Wellbore profile or completion diagram. • Casing flange and RKB (rotary Kelly bushing) elevation • Deviation profile of wellbore. • Cerberus operating limit predictions (if required). • In the absence of Cerberus operating limit prediction, the maximum allowable pressure rating of the tubing and the maximum allowable pull. • Fishing diagram of BHA. • Details of any wireline drift run prior to coiled tubing operations. • Pipe taper chart. • Inside chain tension pressure vs. pull table. • In and out hole hydraulic pressure vs. pull table. Prior to running in the hole, permission must be obtained from the operating company representative. Perform pull tests approximately every 1,000 meters (3,000 feet) or less if circumstances require and ensure that the pickup weight does not exceed the operating limit. When approaching or passing tubing ID restrictions the pull test should be done more frequently (follow CT procedures). While running in the hole, the maximum instantaneous weight loss must not exceed 880 daN (2,000 lb) less than the running-in weight. While pulling out of the hole, the maximum pull must not exceed the lesser of 80% of the coiled tubing yield load or the setting of any overpull safety joint contained in the BHA. At all times, comparisons between weight readings and the hydraulic pressures required to obtain these readings should be made to verify the accuracy of the load cell or weight indicator. There are applications where the installation of a no-go on the end of the coiled tubing is not possible (i.e. slimhole completions with small downhole restrictions). Running without a standard BHA must be appraised and written approval obtained from management prior to commencement of the job. The main cause for concern here is the coiled tubing coming out of the stuffing box if the counter is not 100% accurate. In this case, the tubing must be marked in a manner allowing the operator to recognize when the tubing is nearing surface. There are tools available (i.e. magnetic end of coil detector) that can be run in the rig-up. These tools give a positive indication of the end of the coiled tubing as it passes through them. Correlate depth to a specific point at surface before running into a well. This point in most cases is defined as kelly bushing (KB). Most measurements downhole use the kelly bushing in the depth reference. Assure the original KB depth and distances are available for CT depth correlation 7-28 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 7. TECHNOLOGICAL OPERATIONS In ZERO or low pressure CT applications (pipe-heavy operations), standard operating practice is to minimize chain tension to maximize chain and injector life. In a high-pressure (snub or pipe-light) application, the primary consideration is to maintain the tension in the chains at all times and prevent from chain slack developing. During pipe-heavy operation, the minimum chain tension pressure shall be 400 psi. During snubbing operations (pipe light), the chain tension pressure shall be set in accordance with the Chain Tension Pressure vs. Snubbing Force Chart (Figure 7-24). Figure 7-24 Chain Tension Pressure vs. Snubbing Force Chart The injector can drive the tubing into the hole (snubbing) with the same force as pulling force. If high snubbing conditions exist, the drive pressure should be reduced to avoid buckling the tubing under the chains. Stripper rubbers have a significant effect on apparent coiled tubing weight; thus only strippers supplied by approved vendors must be used at all times. Correct lubricating oil should be used as required to reduce stripper friction further in high pressure dry conditions. 7.3.4 Cementing with Coiled Tubing Cementing with coiled tubing involves pumping the cement slurry through the coiled tubing. Thus using CT for cementing is fast and economic way of cementing; it has minimum volume of contaminated cement and allows for good control of cementing process. There are two main cementing job types performed with coiled tubing: Plugging, where a certain cement volume or plug of a calculated length is placed across a selected interval of open hole or perforated casing. Squeezing is the process of applying hydraulic pressure to place a cement slurry into a desired location (voids), then force the filtrate from the cement slurry to create a filter cake that will remain in place and harden, thus providing the necessary seal / isolation. Several types of CT cement plugs are used, with different purpose of placement. Here below are some most common applications. http://www.petrom.com 7-29 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS Zonal Isolation Zonal isolation is mainly referring to four cementing practices: • Setting a cement plug to isolate a possible zone of interest in open hole. • Placing a plug to seal below the casing seat. • Shutting off a water- or gas-producing zone. • Protecting a low pressure zone before squeezing another (high pressure) zone. Recompletions When an already exploited zone (or perforations) is no more needed for production purpose, the best is to plug it by cement. Following it is possible to recomplete the well for another, different zone of interest. The new zone can be located either above or below the previously plugged zone. If the new zone of interest is below the plugged zone, some kind of zone protection is applied (high-vis pill, sand plug, bridge plug,…). Lost Circulation A cement plug is placed opposite a zone of lost circulation in an effort to penetrate the fractures or voids where LCM fluids are being lost and thus stop further fluid losses. Abandonment Good operating practices and regulatory requirements dictate the abandonment of wells in such a manner that fluid-bearing formations are properly sealed, protected and any further communication with other zones in the wellbore is no more possible. Cement plugs are commonly used to accomplish this. Here below (Figure 7-25) are the sketches with CT cement plug placement for different plugging purposes. Figure 7-25 a) Zonal Isolation; b) Recompletion; c) Lost Circulation; d) Abandonment 7-30 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 7. TECHNOLOGICAL OPERATIONS Coiled Tubing Cement Plug Placing Best Practices The primary reasons for a cement plug failing include the following: Contamination of the cement slurry before it has been placed in the desired location/place; it can happen through dilution or interaction between fluids in the wellbore and the cement being placed into it. Another reason for unsuccessful cement plug can be not proper pre-job preparation. Finally improper application of general cementing practices can also lead to job failure. It is critical that fluid spacers and rubber plugs are pumped prior to and directly after the cement slurry to prevent contamination of the plug. Any cement blend for use with coiled tubing shall be tested in the laboratory to determine the appropriate thickening time and slurry rheology for the planned operation. Wherever possible, a sample of the actual cement and water to be used should be tested. It is imperative that all laboratory cement tests for coiled tubing operations are to be carried out at bottomhole static temperature. Prior to rigging up coiled tubing, a wireline run should be carried out to establish bottomhole temperature, hold-up depth and caliper of the area to be cemented. Batch mixing of the cement is recommended. Volume and hydrostatic calculations must be accurate to place the plug in the correct position in the well. If setting the cement plug anywhere above TD, the plug will require a solid base to set on. The ‘cement base’ must prevent tendency of the cement gravity segregation (a heavier fluid to drop through lighter fluid). Sand, calcium carbonate, high viscosity gel or mechanical plugs have all worked successfully in the past as ‘cement bases”. Some form of depth correlation on the coiled tubing must be run as surface depth measurement is not accurate enough. It is generally recommended that a mechanical tubing-end locator or downhole nipple locator to be used in a conventional coiled tubing string. Pig the coiled tubing reel to determine the total reel volume accurately. Measure volume on a flow meter, a barrel counter and from the displacement tanks, if possible. Ensure that the plug (pig) is in good condition after passing through the reel. If not, determine if there is a problem with the reel. A cementing duty-sequence valve should be considered, especially in underbalanced situations during the cementing operation. This will prevent the uncontrolled falling of cement due to hydrostatic differences and allow better placement control. It will also assist in preventing the collapse of the coiled tubing when operating in high wellhead pressure wells. In these circumstances, if the cement is allowed to ‘free fall’, internal coiled tubing pressure will fall to zero and a collapse condition may arise. CT Cement Squeezing Squeezing is the process of applying hydraulic pressure to place the cement slurry into a desired location, than squeeze the filtrate from the slurry to create a filter (cement) cake that will remain in place and harden, thus providing adequate seal. Reasons for performing a squeeze include the following: • Remedial of a faulty or inadequate primary cement job. • Shut off unwanted water or gas. • Isolation of a zone prior to perforating or production. • Abandon an unproductive zone. http://www.petrom.com 7-31 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS • • Seal off or lost circulation zones during drilling. Repair casing leaks. NOTE: It is important to remember, that by cement squeeze you do NOT squeeze the cement itself into the pore space, but only the water filtrates into the rock voids; this is called cement dehydration. Average class G cement grain size is 25microns what is much more than majority of the sedimentary rocks pore diameters; the rule of thumb is whenever the pumped particle diameter is equal or bigger than 1/3 of the pore size, particles will bridge on the entrance of the void and prevent further migration into pore space reservoir). Coiled Tubing Cement Squeeze Best Practices The well data and production & work-over history must be available with all relevant data which may affect the slurry properties during the squeeze. Since pump rates through the coiled tubing are low, the static temperature of the zone should be used in the design of the cement slurry. Temperature is probably the single most important variable in determining the hydration time of the cement slurry. Thus, accurate bottomhole temperature information is must for job design. Adequate spacers must be pumped before and after the cement slurry to prevent contamination of the cement. Plugs of adequate weight or viscosity must be spaced in below the area to be squeezed to prevent the cement from dropping through the fluid below the zone being squeezed and being diluted or contaminated. Other options are inflatable packers, bridge plugs, sand, calcium carbonate, etc. Here below (Figure 7-26) is the sketch of a remedial primary casing cement job performed by CT. Figure 7-26 CT cement squeeze (primary casing cement remedy) 7-32 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 7. TECHNOLOGICAL OPERATIONS 7.3.5 Acid stimulation with CT Coiled tubing acidizing operations involve the pumping of acids and additives through the coiled tubing. There are two types of acid treatments with CT: • • Wellbore acidizing (acid is pumped only inside the wellbore or maximum into perforation tunnels). Matrix acidizing (acid is forced to flow through the pore space of the reservoir rock). Wellbore acidizing Wellbore acidizing by use of coiled tubing is beneficial because: • Coiled tubing jetting of acids or other treatment fluids can dissolve and break up scale allowing it to be circulated to surface; tools like SLB’s ‘Jet Blaster’ are effective tools for cleaning the tubular internal area or perforation tunnels even. Some scales are not soluble in acid and even hard to be broken by jet; thus the use of rotary or impact drills run on coiled tubing may be required in those situations. • Use of coil makes possible spotting of the treatment fluid across the entire interval, by freely moving CT up/down as required. Pumping rates and CT moving velocity can be easily adjusted for the best acid efficiency. • CT small diameter permits entering restricted areas for spotting the acid in places like GP filters, slim size liners etc. • Wellbore acidizing by use of CT allows for the well to be worked on live, eliminating the need to kill the well with potentially damaging kill fluids. Matrix Acidizing Matrix jobs are designed to restore permeability to the formation by pumping treating fluids into the formation at below the fracture pressure. The use of coiled tubing for this type of stimulation: • • • • • • • Protects the customer's wellhead and tubular and expensive completions from exposure to the corrosive effects of the treatment fluids and high pressure. Avoids bull heading the contents of the wellbore into the formation. Reduces volumes of acid required and with the use of effective diverting agents, puts the acid directly at the targeted perforations or zone of interest. Allows the use of specially designed tools such as RTTS (‘resetable test & treat straddle packers’) and other isolation systems for effective treatment of long (or even longhorizontal) intervals. Reduces the amount of steel the acid contacts prior to entering the formation. Allows for treatment on live wells, without killing the well. CT can be used for lifting the well and initiating inflow from the reservoir following the acid stimulation. In some cases time to complete the removal of the spent acid from the wellbore is essential; Nitrogen lifting combined with CT is one of the best ways for well cleaning after acid stimulation. The matrix acid stimulation is performed with closed well, while pumped acid is directed into the reservoir pores. It is imperative to keep the treatment pressure below the fractured pressure, thus uniformly spreading the acid across the treated interval/zone/volume. If applied pressure will cause http://www.petrom.com 7-33 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS unwanted fracture of formation, in this case entire treatment acid volume will escape into the fracture and it will result in failed matrix acid stimulation. Frictional pressure losses are much higher when deploying CT due to the smaller tubular size of CT; this may be very important if surface pumping system has low pressure limitations. Thus is very important to calculate/model the pressure profile for an acid job with CT. CT Acid Stimulation Best Practices Prior to commencement of the job a laboratory testing must be carried out on the build up or scale to determine the correct choice of treatment fluid. Further, fluid compatibility tests must be performed to ensure that any contact with the formation by the treatment fluids will cause no further damage to the formation; the same for the reservoir fluids compatibility with acid(s) – so called ‘sludge & emulsion test’. Necessary samples must be obtained from the client for completing above laboratory tests. For CT acid stimulation design a complete wellbore geometry must be obtained from the client showing the location and size of any downhole restrictions and deviations. CT design software (for ex. Cerberus) must be run to determine the correct size of tubing to be used, the maximum rates required to carry solids and a complete tubing force analysis must be performed. When working through scale the operator must be aware of two possibilities: • There is pressure trapped behind the scale; thus maintain enough pressure on top of the scale to protect the coiled tubing from a kick. • No pressure behind the scale and all the broken scale circulated above nozzle falls back into the well. Don’t lift too much fill at one time. Take small bites pulling back into previously cleaned areas of tubing, allowing returns to clean up. Consideration must be given to the disposal of the treatment fluids returned to surface. All acids pumped through coiled tubing must be properly inhibited to protect the tanks, pumps, lines, coiled tubing and well tubular. The inhibitor concentration should be chosen with consideration to the duration of the operation and the downhole temperature. It is good practice to pump 10 to 20 liters (2 to 4 gallons) of inhibitor ahead of the acid. Fast moving, partially spent acid and gas can severally corrode the coiled tubing; thus keep fluid velocities to the minimum rate required to lift fluids and clean the well. NOTE: Do not allow the acid to enter the formation as the loosened debris might plug the perforation tunnels. Special safety precautions should be taken prior to commencement of any acid or chemical operations: • All personnel are aware of acid hazards and fully equipped with the correct protective equipment and clothing for chemical operations as per Company standards. • Wash-down hoses are available and charged prior to any acid handling taking place. • Eye baths are available at suitable locations. 7-34 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 7. TECHNOLOGICAL OPERATIONS • There should be an adequate supply of CaCo3 (Calcium Carbonate) available during the entire operation to neutralize acid in the event of spillage. Soda-ash is used for neutralizing the coiled tubing after the acidizing operation. • Chemical hazard data sheets must be available for each chemical that is being used. Copies of these should be given to the medic and the safety officer. • All personnel involved with the operation should be made aware of the correct mixing procedure for the chemical. For acid mixing, the acid should be added to the water after any other chemicals. • All equipment containing or contacted by the chemical/acid must be flushed out and neutralized after use. NOTE: More details regarding matrix acid stimulation is available in the section of acid stimulation; all those rules and best practices apply too when using CT for acid deployment. 7.3.6 Killing, Circulation and Clean-out the Well with CT Killing, circulating or cleaning out a well involves pumping fluids like oil, water, brine, mud, foam or even Nitrogen. Pumped fluid replaces the liquid or gas existing in the wellbore, assuring required hydrostatic head for well control, removal of debris, stimulation or cleaning tubular inner walls or others. This process could also refer to pumping lost circulation materials and sand plugs. Deployment of CT may be beneficial and cost effective way of killing or circulating the well in many cases. CT Design Considerations and Best Practices Generally there are two widely used methods for well killing operation: first is the ‘weight and wait’ method and the second one is ‘driller's’ method. Coiled tubing uses primarily the ‘weight and wait’ method, where the well is shut in and an appropriately weighted fluid is prepared and pumped into the well through the coiled tubing string. The ‘driller's’ method involves continuous circulation of fluid as the weight is gradually built up to the density required to kill the well. The bottomhole pressure must be known to enable mixing of the correct density of kill fluid. Sufficient fluid should be mixed to displace the coiled tubing and entire well volumes as required. The kill fluid or clean out fluid should be pumped with the coil at the lowest possible circulation point in the well. The pump must be capable of sustaining an appropriate rate and pressure throughout the entire well-kill operation. The weighted fluid should be pumped through the coiled tubing with minimum frictional pressure losses; friction reducer chemicals are often added with this purpose. Back pressure should be maintained as the fluid is circulated into the well and returns should match injection volumes, which is accomplished through the use of a choke on the return line and close monitoring of the rig tank levels. 7.3.7 Drilling, milling and under reaming with CT CT can be used for drilling or milling purposes as well. However there are several limitations when it comes to use the CT for these kind of ‘heavy load’ well interventions. These limitations are mainly due to low pumping capacity, restricted weight-on-bit load and requirements for special motors and http://www.petrom.com 7-35 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS tools for drilling/milling. Thus CT milling and drilling is applied only in some special cases and under specific considerations; working the bit/mill on relatively short distances, under light work conditions. Motor Type The basic equipment in CT drilling and milling is the downhole CT motor; a positive displacement or a turbine motor. Weatherford offers three different types of downhole CT motors, namely: • Weatherford CTD® Motor, the standard elastomeric work over motor. • Weatherford eCTD® Motor, the even-wall work over motor (with uniform elastomer wall thickness). • MacDrill® Motor with a Gear Box installed, for use in harsh well conditions. Other CT service providers have similar CT motors, with their own brand-names. Different drilling/milling applications will require different type of motors, to suit the working conditions and assure necessary prates of penetration and job success. Motors are available in different sizes, torques and horse-power ranges. CT torsion yield should be at least twice the maximum output torque of the motor being used. This is especially important when running larger motors with higher torque ratings. The overwhelming majority of all coiled tubing strings are rated within the safe zone for use with Weatherford motors. RPM ranges should be in the 250 – 600 range dependent on motor size and type used. WOB capability should be between 5Klbs and 25Klbs, depending upon motor size and application. Generally, drilling soft formations will require low WOB, while high WOB may be required to complete the milling operation. Mill Type Weatherford offers 3- or 5-blade Clear Cut Mills. Mills are dressed with custom cut TM octagon milling inserts and medium to large crushed carbide rock. The mill is available in either concave or convex configuration; the concave design is slightly more aggressive and produces slightly larger cuttings than the convex design. The concave therefore would be recommended for those operations involving the removal of a limited amount of material while the convex is recommended for operations calling for the removal of larger volumes. Recommended mill OD is equal or just below the drift diameter of casing or tubing. The mill shall have a minimum shank length of 4” and be of a fishable diameter within the tubing in which it is being used. Pumping flow rate while milling should be between 30 and 160 gallon per minute, depending upon motor size and fluid properties. Pump rates should be sufficient to maintain fluid velocities capable of effectively carrying the cuttings and clean the well-bore. Special attention should be paid when using commingled drilling fluids with nitrogen and/or air. Weatherford’s Mac-Flow program can assist in determining the appropriate flow rates for the various motors and gas/liquid ratios. Larger diameter CT will generate less friction loss, allowing higher pump rate capacity for a given pressure. It will also reduce the annular flow area, which will increase the annular velocity to assist in hole cleaning. In general, the larger the CT - the better it is for drilling/milling. 7-36 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 7. TECHNOLOGICAL OPERATIONS CT Operating pressure limitations should be considered during pre-job modeling to ensure sufficient hydraulic capacity is available to achieve desired flow rates and that sufficient pressure is available to allow a minimum of 1,000-PSI beyond straight circulating pressures with which to operate the motor. Pre-Job modeling discussions should ensure that the CT can access the milling target zone and be retrieved from the well without exceeding its strength limits. Periodic weight checks should be conducted throughout the operation. Ensure pumping medium is as free of solids as possible. Down hole and surface filtering is recommended for all motor operations. Hold Safetly & Operational Pre – Job Meeting M/U CT Connector & Pull Test NO Good Test YES Complete Post Job Operational Summary in Database M/U BHA & Pressure Test NO Perform post operation motor care procedures Good Test YES POOH Circulating at maximum flow rate available RIH Tag Drop ball & activate Circulation Sub P/U 3' and Increase pump rate to optimum Mill Plug Note Pressure Drops at respective flow rates NO Stall Motor? RIH Slowly and tag plug Note pressure increase YES Increase WOB for optimum ROP NO Shut down pump & bleed off pressure Exercise patience while cutting pattern is developed Stall Motor? YES Figure 7-27 Weatherford’s CT milling flow process chart http://www.petrom.com 7-37 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS 7.3.8 TCP under balanced perforation with use of CT Tubing conveyed perforation is deployed on vertical wells which require long perforation intervals (where multiple W/L runs are not economical), or on deviated or horizontal wells (where W/L conveyed perforation is not possible). When the TCP guns are in place and production packer has been set, there are two methods for creating the under balance conditions: the method when production tubing string has a Sliding Sleeve Door (SSD) installed; in this case the SSD is used to displace the tubing volume to Nitrogen, for creating the under balance condition. If there is no SSD built into the production string, the only method for creation of under balance conditions is to use CT. In the text below case with use of CT is described. The well is completed for production, with packer set, TCP guns in place, TH landed, BOP removed and production x-mas tree installed. CT is rigged up on the top of the x-mas tree and testing manifold is hooked up to the wing side if the x-mas tree. CT is run to desired depth and liquid from the tubing is displaced by N2; fluid displacement can be done in one or in multiple steps. After displacement the CT is POOH and rigged down. Well is left filled with N2 under pressure. Wellhead pressure of N2 is now bled down through test manifold to required level, for creation of the designed under balanced conditions. TCP perforation is initiated by dropping the bar and firing the mechanical firing head. Production is initiated immediately following the perforation guns have fired, simply by opening the choke on the test manifold. Nitrogen is in most cases bled down to the vent (or flare stack), while liquid phase in captured in the surface tanks; or in the surface testing facilities, if rigged up on well site. If the well is tied in to a production park, the stabilized flow from the well is directed to the flowline and park. Always use test manifold choke(s) for bleeding off the N2! Use of x-mas tree adjustable choke to bleed off large volumes of gas can damage the choke seat or stem (if any solids are present the flow stream); this requires expensive repair and additional services. Figure 7-28 Well test manifold with one fixed and one adjustable choke assemblies 7-38 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 7. TECHNOLOGICAL OPERATIONS 7.3.9 PLT logging with CT Production logging of deviated or horizontal wells is not possible with simple deployment of wireline PLT tools. The alternative method is to use the standard CT with memory PLT tool string; or the CT with electric line inside the coil and standard W/L PLT tool string. Lubricator pipe of necessary length is installed on the top of the production x-mas tree. The PLT tool string is assembled on the surface and lowered into the lubricator. NOTE: A special ‘C’ plate has to be used for supporting the PLT tool string hanging on the top of lubricator pipe. CT is now rigged up, lifted by a crane or rig above the ‘C’ plate. CT bottom is connected to the PLT tool string and the CT injector head with CT BOP is made up to the top of the lubricator. NOTE: For some long PLT tool strings there is a special frame needed for supporting the WH PLT and CT equipment. Slide below (Figure 7-29) is an example from field for long PLT tool string and lubricator. Figure 7-29 Long PLT tool string and lubricator PLT tool string is RIH on CT until it reaches the targeted production zone. Flow is now initiated either by opening the well production wing valve or by use of some artificial lift methods (gas lifting or ESP pump with ‘Y’ sub). While well is producing, the CT is worked through the producing zone up and down at desired speeds and as per PLT program. Data have been recorded in the memory of the PLT tool string or real time on the surface in the case of CT with electric line fed through CT. NOTE: If the length of the horizontal section is too long and CT is exposed to high frictional resistance to move towards the TD, the CT will start to buckle and it may be not possible to reach the TD or move the PLT tool string with desired dynamics. In such cases use of additional CT rollers is advised, to reduce the friction between the CT and hole inner wall. http://www.petrom.com 7-39 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS When PLT logging is completed, the CT is POOH and complete well head service equipment are rigged down from the x-mas tree. PLT memory recorded data are downloaded and PLT test interpretation can be done accordingly. 7.3.10Running plugs, retainers and packers with CT With recent developments in through-tubing technology the CT is often used for deployment of different type of plugging devices landed inside tubing string or in casing. This is especially needed on those wells where wellbore geometry does not allow use of standard slick line or wire line services. Figure 7-30 CT used for deployment of different types of plugging devices 7.4 Nitrogen Operation Nitrogen is inert gas widely used in oil and gas industry. There are several areas where N2 is used, among others well services and work over. Nitrogen has relative density of 0.967 (air=1.0), boiling temperature of -195.8°C (-320.45°F) @atmospheric pressure; is colorless and odorless. Nitrogen is not toxic, but can replace the Oxygen from the air and thus be very dangerous for personnel. As Nitrogen is transported to the wellsite in liquid phase, cooled to -160°C and in pressurized special tanks, working with it requires special attention and safety measures. On wellsite Nitrogen is stored at -160°C in double skinned tanks insulated by an evacuation and an additional perlite or foil layer. Despite excellent thermo insulation N2 losses are still present; these losses can be as much as 2% by volume per day during transportation (when the tanks are subject to excessive vibration and agitation), or 0.5 - 1.0% by volume per day for normal static wellsite storage. 1.0 liter of liquid Nitrogen will form 0.7m3 of Nitrogen gas under standard P/T conditions. For 1kg of liquid Nitrogen the equivalent amount of N2 gas is 0.88m3. 7-40 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 7. TECHNOLOGICAL OPERATIONS Figure 7-31 Physical properties of liquid and gaseous nitrogen 7.4.1 Nitrogen Pumping Unit Nitrogen pumping unit usually comprises of: • Cryogenic pump - capable of pumping 120 m3/minute at pressures of up to 690 bar (when using coil tubing, maximum pressure should be kept to or below 310 bar). • Heater - Indirect diesel fired type with a capacity of up to 5 MMBTU/Hr, capable of raising the nitrogen to an operating temperature between 20°C and 95°C. • Diesel Engine and control panel. • Surface piping system (chicksans). Liquid nitrogen is rapidly vaporized in a pressure-raising coil to build-up and maintain storage tank pressure. It is this pressure which drives the liquid Nitrogen to the cryogenic pump. The pump then forces the liquid Nitrogen to flow through a vaporizer where it is gasified to the required delivery temperature and then passed to the wellhead or coiled tubing by chicksans pipe system at a controlled rate and pressure. http://www.petrom.com 7-41 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS Figure 7-32 Nitrogen tank with Nitrogen pumping unit (red) working with CT unit (yellow) on 4338 Mamu well 7.4.2 Use of Nitrogen Nitrogen in work over services is used either to form different types of foams and benefit from physical properties of foams (low density, two phase flow, high flow resistance, etc), or is used a gaseous Nitrogen. There are three different types of foams, depending on the ratio between Nitrogen and base fluid (liquid) – so called foam quality. Example: foam quality 75% means 75% N2 and 25% liquid. Energized fluid is the foam where Nitrogen ratio in the work fluid is below52%. Energized fluids are used for acid stimulations, well flow back or well cleaning operations. Nitrogen content is 1001,500SCF/bbl. Energized fluids have better leak-off control in the reservoir due to increased friction losses of the two-phase flow. Foamed fluid is the foam quality between 53% and 95%. Foamed fluids are used for acid stimulation, fracturing or well cleaning operations. Nitrogen content is 500-5,000 SCF/bbl. Foamed fluids have improved rheology, lower density, expanded volume, need for less liquid phase. Atomized fluid is the foam with Nitrogen content above 96%. Atomized fluids are used for acidizing, scale or corrosion inhibition. These fluids have better penetration rates, greater coverage of the treated zone, less hydrostatic pressure. Nitrogen as a gas is used either as gas cushion of for liquid lifting purposes. It can be pumped directly to the wellhead or by use of CT to desired depth in the well. 7.4.2.1 Well lifting and livening Well lifting or livening with Nitrogen can be done on three possible ways: Bullheading the liquid from tubing /well into the formation by pumping N2 to the wellhead (x-mas tree). When the certain volume of the tubing is displaced to N2, the WH pressure is bled down, hydrostatic head onto formation is lowered and this way flow is initiated. Another way of lifting with Nitrogen is to use the circulation device built into the tubing string; it is in most of cases the sliding sleeve door (SSD). SSD is shifted in open position by use of slick line or CT. Fluid from the tubing is displaced by Nitrogen through the SSD into the casing annulus. Excess fluid 7-42 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 7. TECHNOLOGICAL OPERATIONS from the casing is flowed to surface tanks. With Nitrogen WH pressure kept, the SSD is closed by use of S/L. Than the pressure on WH is bled down and thus flow is initiated. The third method of lifting with Nitrogen is to use the coiled tubing (CT) for displacing the fluid from the tubing/well. CT is RIH to certain depth and N2 is than pumped to the CT depth. After exiting the CT the Nitrogen is rising up-hole pushing the liquid above it towards the surface. NOTE: It is not advised to lower the CT too deep (3-4 thousand meters) into the liquid phase, as it will require higher N2 pressure for lifting fluid, and may also create strong & fast pressure drawdown onto the formation. Better proceed in steps (1-2 thousand meters) when unloading a well. 7.4.2.2 Foam acid or foam cement operations Foam acid or foam cement has it’s advantages over liquid acid or cement due to the physical properties of foams. First of all the hydrostatic head of a foam column in the well is much less than the liquid one. Long casing intervals with low reservoir pressure to be cemented are good candidates for foam cement application; it may save operator from performing the two-stage cement job. Foam cement can also perform better filling of the space behind the casing while using less water in the cement slurry. Foamed acids have also low density. At the contact with formation, the two phase flow (gas & liquid) creates extra pressure losses thus allowing better leak off control during acid stimulation. Fluid losses are reduced by use of foam acid. If the treated formation is fractured carbonate reservoir, the foam acid will penetrate deeper into the fractures and there developing carbonate dilution by acid behind the near wellbore zone. Foam acid treatment also has the advantage of storing the Nitrogen compressed energy when pumped into the reservoir. That energy can be used to produce the well and quickly flow back the products of the acid reaction with formation. This is especially applicable in low permeability reservoirs; in cases where the reservoir pressure is low and permeability is high, the Nitrogen pressure will rapidly dissipate into the reservoir, quickly escaping away from the wellbore. Stabilization of foams is enhanced by use of foam stabilizers. This way the life of the foam can be extended as per stimulation design requirements. Here is an example of foam hydrostatic head for different foam qualities (Figure 7-33). 7.4.2.3 Underbalanced perforations Underbalanced perforation is done with purpose of minimizing the perforation induced SKIN factor. The hydrostatic pressure in front of the reservoir is kept below the actual reservoir pressure in the moment of firing the guns. Thus all the material created as a product of gun fire and explosion is immediately flown back from perforations as soon as the instant explosion pressure disappears (in thousands of second). For creating the required under balance pressure one of the way is to use the Nitrogen cushion. Pressure of the Nitrogen inside the well (tubing) can be easily adjusted to meet the UB perforation design requirements. Additional benefit of using Nitrogen for UB perforation is the ability to initiate the flow and flow back the well. Nitrogen pressures can be red from tables for various wellsite conditions; here below is one example of those tables. http://www.petrom.com 7-43 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS Figure 7-33 Hydrostatic head of foam with different foam qualities Figure 7-34 Hydrostatic head of the gaseous Nitrogen column as the function of depth and WH pressure 7-44 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 7. TECHNOLOGICAL OPERATIONS 7.4.2.4 Well protection or pressure testing Nitrogen is inert gas thus is used for protection of the completion equipment or wellhead and x-mas tree equipment. Nitrogen can be used to fill the well if the well has to be kept under pressure, but the reservoir fluid is sour or corrosive, while the completion equipment are not for sour service. If mixture of hydrocarbon gases and air has minimum 30% of Nitrogen, that mixture is no more dangerous from explosion point of view. Thus Nitrogen can be used as additive to air if airlifting of the well has to be performed. Nitrogen is widely used for pressure testing the equipment, especially in work over and completion of gas wells. 7.5 Snubbing Operation Snubbing WO operation is the way of performing work over on life well, with positive well head pressure; during snubbing WO operation the well is not killed and circulated to WO fluid; the WO fluid is the original well fluid. The snubbing equipment with associated systems shall be capable of handling the workstring, well conditions and other work parameters specified by the work program. In the following text there is minimum functional requirements for snubbing equipment. The snubbing well intervention (work over!) system will normally consist of the following main items: • Snubbing units/snubbing units with derrick/mast type structures, • Pipe handling system, • Jack/pulling unit, • Work window, • Slips tong post/tongs, • Winch package, • Gin pole, • Workbasket and operator cabin, • Circulating system, • Control system, • Data acquisition system, • Hydraulic power pack, • Well control system and • Workstring and BHA. The snubbing system shall be designed to and be capable of efficiently handling tubular such as, but not limited to: • Drill and workstrings • Casing and tubing strings • High pressure risers and associated equipment (optional) • BOP stacks and x-mass trees (optional) Requirement for modularization shall be specified. http://www.petrom.com 7-45 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS The system design shall allow for performing Wireline work and electric logging operations within the workbasket/snubbing unit working platform area, considering space, height, equipment handling, access to the equipment and weather protection. The equipment should be equipped with a four point lifting arrangement for both horizontal and vertical handling of modules where applicable. Figure 7-35 Dafora snubbing unit, WO rig assisted (Romgas, Romania) Snubbing units / snubbing units with derrick/mast type structures The derrick, mast or hoisting structure shall be designed to withstand the loads and forces imposed by the relevant operational and environmental loads. In addition, the structure can be used for support of pipe handling equipment, and support for racked tubular on setback areas if applicable. Access in connection with operation and maintenance of equipment shall be catered for by suitable and safe access from deck or installed work platforms. From current practice it follows that the various work platforms in structures (including platform for installation of casings) shall be adequately equipped with safety devices, lifts, stairs or ladders for safe access. Lubrication points with difficult access in the workover area, such as sheaves, shall be routed to a readily accessible area. Sufficient number of hang off points of required capacity for travelling assembly, manual rig tongs and work winches shall be installed. All hang off points and/or pad-eyes shall be properly marked with safe working load, and the design shall ensure that safe working load does not exceed 20% of the breaking load. The snubbing unit working platform area shall in relevant areas be designed for dropped object protection, i.e. to withstand the impact from the heaviest expected tubular falling from a height of 1.5 m. All permanently manned working areas shall be weather protected. The primary work area shall be covered with a non-skid material. The substructure shall be designed to form an adequate foundation for the structure/mast or hoisting structure and the snubbing unit working platform area, and provide required elevations and 7-46 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 7. TECHNOLOGICAL OPERATIONS handling space for BOPs and optional x-mas trees etc. The substructure shall be designed to withstand all combined loads from, mast or hoisting structure and snubbing unit working platform area with full loading, BOP handling loads, if applicable, as well as equipment installed in the substructure itself. The complete design shall be considered for lubrication (space out) of applicable BHA such as running and pulling perforating and gravelpack assemblies when rigged up on a live well. Figure 7-36 Snubbing unit (stand alone) and the key elements of a SU Pipe handling system The snubbing unit shall be equipped with a remote pipe handling system to include • • • Vertical pipe handling system; Horizontal pipe handling system; Horizontal to vertical pipe handling system. The workbasket/snubbing unit work platform area shall be unmanned and equipment remotely operated in normal “drilling” and tripping operations. The horizontal transportation system and the horizontal to vertical transportation system shall be remote operated with the possibility for stowage, make up, break out and suspension of workstring, collars, casings and tubing in the rotary table. Transport of workstring, casing, collars etc. to and from storage location in front of “ V- door “ to the snubbing unit working platform area. The complete string of tubular shall be stored on a location where it require no platform crane handling between the storage location to the snubbing http://www.petrom.com 7-47 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS unit workbasket/working platform area (drillfloor). An anti collision system should be installed to prevent collision between the main hoisting equipment, the pipehandling equipment and structures. Jack/pulling unit The snubbing unit shall have a pulling and pushing (snub) capacity to the maximum expected and anticipated load for the operation. Rotary head or top drive shall be protected. The hydraulic hoses to the unit shall have sufficient lengths to position the hydraulic support system at the required distance from the well area. All hoses in suspension from a connection shall be equipped with quick disconnect complete with locking feature including dust plug and cap. The unit shall be equipped with an anti buckling guide tube system to support the workstring and the inside diameter to suit actual workstring. Figure 7-37 Pulling & pushing slips and the spherical BOP of a SU Work window The unit shall contain a work window assembly and the height shall be according to the requirements in the work program. Window shall be designed with load rating equivalent to the jack and/or pulling unit with feature for hanging off the workstring. There shall be a work platform at the work window level. Slips The slips design rating shall be equivalent to at least the maximum thrust of the jack/pulling unit system and shall be remote operated. Unit shall be equipped with dual redundant stationary snub slips. The slips shall be equipped with a cross port relief valve system to prevent hydraulic and mechanical damage in the event of forced opening of equivalent function. 7-48 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 7. TECHNOLOGICAL OPERATIONS Tong post/tongs Tongs shall be remote operated. If an old system with conventional tongs are used the following applies: the height from the tong post arm to the workbasket handrail shall be adequate to accommodate the power tong and with a suspension and trolley arrangement to allow swinging of tong away from the centre line. Further, tong suspension arrangement should allow the introduction of a spring to prevent overload of tong arm during make-up of tubular joints. Tong suspension should also incorporate tong backup attachment eye, rated at the maximum horizontal force resulting from the maximum tong torque capacity. One set of tubing tongs with slide heads for both tong and backup to fit the tube and upset connection of the workstring. Winch package The dual type counterbalance winch package shall if used be skid mounted with drip pan. The winch package shall contain an automatic fail-safe brake in the event of hydraulic failure and the safe working load on the winch shall be determined by the work program. Winch package can be voided if design of unit do not require such system. Gin pole Where a gin pole system is required, it shall be able to extend to such a height that the distance from the bottom of the gin pole sheaves to the workbasket (handrail) is sufficient to accommodate the pipe length (Range II or III) plus safety valve, circulation swivel, swivel with tackle including a reserve air gap of minimum 1,0 m (3 ft). The system shall contain a hydraulic arrangement for raising and lowering of the gin pole. Figure 7-38 The BOP configuration of a SU; the ‘gin’ pole and work platform Workbasket and operator cabin If the jack and pulling unit is designed with a workbasket, the travelling head area shall be equipped with removable internal handrail to guard against the rotating workstring. Personnel safety and working environment shall be given due consideration. The workbasket shall have two independent escape exits and be equipped with wind walls for weather protection, and a workstring mark board in the workbasket area for operator quick reference of workstring depth. The layout of the operator http://www.petrom.com 7-49 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS cabin shall ensure full operational control and view from the operator’s position to the various parts of the work floor area. The control cabin shall have an ergonomic layout and shall be equipped with laminated glass, oil resistant wiper or cleaner and a suitable mechanical ventilation system. The control cabin shall facilitate all necessary controls and monitoring equipment to operate the complete snubbing unit and well control equipment as defined here. Control cabins shall satisfy the following requirements: • The roof and windows shall have adequate strengthening or protection against falling objects. • Due consideration to be given to visibility on control system visual display unit screens. • Jack "snub" and "heavy" force limitation shall be pre-set at power pack manifold local adjustments in workbasket and cabin shall not override the pre-set value. • There shall be individual hydraulic circuits for jack, pipe-handling system, BOP and auxiliary system. Each circuit shall have an adjustable pressure safety relief and pressure indicator Interlock shall be provided to prevent inadvertent opening of the stationary and the travelling heavy slips simultaneously. It shall be possible to manually over ride this interlock. The controls and monitoring equipment shall as a minimum include the following: • Torque control for rotary or top drive, • Rotary/top drive speed adjustment, • Rotary/top drive direction control, • Power package speed control, • Power package shut down, • Power package ESD, • Selector for operating jack by two of four cylinders (option), • Jack direction control lever, • Slip bowl control levers, • Slip pressure regulator, • Weight indicator (heavy and snub force), • Wellhead pressure and • Circulating pressure. Figure 7-39 Operator console and the big stand alone SU with working platforms 7-50 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 7. TECHNOLOGICAL OPERATIONS Data acquisition system The snubbing unit shall be equipped with a data acquisition system to display and record operational parameters. The data-sampling rate shall be sufficient to record relevant variations in the displayed and recorded parameters. A system for analyzing the recorded data shall be available at the location. The snubbing unit shall be equipped with a data acquisition system to monitor and record the following parameters: • Time and date, • Workstring weight, positive and negative (heavy and snub), • Jack hydraulic system pressure, • Wellhead pressure, • Workstring pressure, • Workstring depth, • Rig and slip hydraulic pressure, • Rotary torque and rpm, • Workstring connection torque, • Optional: volume control and • Optional: pump speed. In addition, there shall be a back-up system, which records: • Workstring weight (positive and negative), • Wellhead pressure and • Workstring pressure. Figure 7-40 Rotary device for SU Power package Two independent power packages are required at the work site. Minimum one unit shall be diesel driven and capable of supplying sufficient power to operate all operating systems of the snubbing unit on a continuous basis and at peak demand. The power package shall be designed and sound proofed in accordance with NPD Regulations. Provisions shall be made for a manual ESD system that is operated locally and remotely from the workbasket/control cabin. The power package shall be certified for operating in Zone II areas and in accordance with Company’s HSSE standards. Provisions shall be available for remote and local control. Individual adjustment and presetting of the operating limits for maximum pull and push forces to the snubbing unit shall be http://www.petrom.com 7-51 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 7. TECHNOLOGICAL OPERATIONS possible. These shall be protected from adjustment during normal operating conditions. If the power package is used for charging the accumulator system for the well control equipment, the hydraulic circuit from the well control accumulators shall be separate from the other hydraulic circuits. Only the well control system shall be able to take hydraulic pressure from the dedicated accumulators. Circulating system The circulating swivel and circulating hose working pressure to comply with operational requirement. The integral 90° gooseneck with lift eye shall if used be compatible with counterbalance winch. Pin connection on swivel shall be compatible with the safety valve requirements. Minimum circulating hose length shall be equal to one single joint and end connection equipped with safety clamps and chain. Well control system Well control system to be according to the below table: Table 7-8 Snubbing primary well control system PRIMARY WELL CONTROL SYSTEM is defined as folows: External Well Control Equipment Snubbing Stripper bowl or active stripper Two stripper rams Equalising loop system One annular preventer Workstring Two back pressure valves in BHA Internal Well Control X X X if used X X Table 7-9 Snubbing secondary well control system SECONDARY WELL CONTROL SYSTEM is defined as folows: External Well Control Equipment Snubbing One combined blind/shear ram Two pipe rams (fixed or variable) One annular preventer Minimum one choke line outlet Minimum one kill line inlet Minimum one manual gate and/or plug valve on each choke and kill line and minimum one remote hydraulic operated gate and/or plug valve. Alternatively the remote valve in kill line can be replaced with one manual valve and a chack valve. One nipple profile in the BHA One stabbing valve 7-52 Internal Well Control X X X X X X http://www.petrom.com X X RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 2012 7. TECHNOLOGICAL OPERATIONS Workstring and BHA The workstring shall meet the operational requirements with respect to maximum anticipated pressure, temperature, torque, tension and compression. The workstring shall be inspected and a verification report shall be issued stating approved and found suitable for operation as a minimum. The tubing shall have documented traceability. A pipe tracking system may provide documented traceability. During operations the workstring limitation for over pull shall be set to 80% of manufacture's tensional yield/torsional yield of the workstring. For live well interventions, the type of connection for use in the workstring above the BPVs (check valves) to meet the requirement of minimum two independent gas tight metal to metal seals. The seals must withstand internal and external pressure. Drifts (2 each size), stabbing guides (2 each size), necessary x-overs and overshots for fishing the workstring components shall be included. Back pressure valve (BPV) The BPVs prevents well fluids from entering into the workstring. The BPV is a barrier element and shall have a working pressure rating equal to the expected wellbore pressure. The BPVs shall be provided with seals in the bore towards the BHA and provide internal and external seal. Provisions shall be made for pumping balls through the BPVs. Others All other equipment or tools in the BHA shall be qualified and designed to withstand all expected down hole forces and conditions. 7.5.1 Rig-up and Rig-down for Snubbing Operation Figure 7-41 Snubbing unit BOP equipment rig up options http://www.petrom.com 7-53 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS 7.6 Wireline Logging Wireline logging are services and tools for evaluation of reservoir and well properties, as: • Resistivity tools: o Induction: AIT, and o Laterolog: HALS, HRLA. • Spontaneous potential: o BSP (flexible bridle for HALS), o Stiff bridle, o SP sensor in the AIT bottom nose, and o SPA-A separate tool. • Temperature and tension: o LEH-QT (logging head with downhole tension sensor and max temperature measurement). • Gamma Ray: o SGTN, o EDTC (telemetry cartridge, normally used when a separate tool is not necessary), and o HGNS. • Spectroscopy: o HNGS, combined with Platform Express tools. • Sonic: o Sonic Scanner (aka MSIP or MAST) which can be run in 2 configurations: o DSLT. • Caliper: o PPC – 4 arm powered caliper, can also be run for centering the string when necessary, and o TLD caliper – 2 arm caliper • Inclinometry: o GPIT, and o FMI also includes full inclinometry. • Neutron porosity: o HGNS (part of the PEx – Platform Express). • Litho-density: o TLD (part of the PEx – Platform Express). • Microresistivity : o MCFL (part of the PEx – Platform Express). o Cement evaluation (hole size from) : o Basic configuration Sonic Scanner (aka MSIP or MAST), and o DSLT. • Casing and cement evaluation: o USIT. • CCL: o CAL-Y. • Formation Micro Imaging: o FMI and o OBMI. • Pressure Points: o MDT (PSLD_Probe-HY- PC). • Fluid Identification and Sampling: o MDT (PSLD_Probe-HY-POStandard_DU-LFA-SC-SC-PC). Common WL tool combinations are shown in Appendix 7-A. 7-54 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 7. TECHNOLOGICAL OPERATIONS 7.6.1 Rig-up and Rig-down A Safety meeting will always be held prior to starting the operations and all personnel involved in the operation must attend it. It is usual procedure that two OMV Petrom workers (the driller and the tagger line operator) will assist a service company to rig up and rig down WL equipment and tools. The time spent for rig up or rig down depends on the crew number; it usually takes between one and two hours to run in hole. One should never be in a rush whenever heavy lifting or pinching points are involved. The service company engineer is completely responsible for all operations at hand, therefore he should closely supervise and be involved in all rig up/rig down procedures. While running in hole there are certain speeds that should be followed and used while maneuvering the winch. These speeds have been implemented in the system in order to prevent any unfortunate accidents from happening, like unintentional pull outs, damage of tools and most important injury to the people involved in the operation. It is required that operating speeds, which are part of depth control procedure and Pull-Off prevention, are maximum 1m cable slack / 1000m well depth. In case the tool string gets stuck, the decision to start fishing operations belongs to the OMV Petrom. Speed in the top 100m of the well can be increased to 30m/min only if running the same tool string configuration in the same trip to the well (“continuous operation”). The usual speed limits are shown in Figure 7-42. Figure 7-42 Speed limits http://www.petrom.com 7-55 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 7. TECHNOLOGICAL OPERATIONS Table 7-10 Wireline logging operations Service Company Log Name Generic Name Schlumberger ft/min 60 60 60 60 30 30 30 30 60 15 30 30 30 30-60 Stations 30 60 60 Phased induction PI or DPIL Special Induction AIT or HDIL Azimuthal Resistivity Image ARI Dual Laterolog DLL Compensated Density LDL or ZDL Compensated Neutron CNL ot CN Dipmeter HDT or HDIP Gamma-Ray (Evaluation) GR Gamma-Ray (Correlation) GR Spectroscopic Gamma-Ray NGS or SL Microsphericaly Focused Log MSFL Microlaterolog MLL Formation Imager FMI or STAR Acoustic Imager DSI or MAC Combinable Seismic Imager CSI Borehole Imager UBI or CBIL Borehole Compensatated Sonic BHC Sonic or BHC Acoustic Platform Express AIT/TDD/CNL/GR/MCFL Western Atlas Feet/Min m/sec ft/min m/sec 0.3 60 0.3 0.3 60 0.3 0.3 60 0.3 0.3 60 0.3 0.15 25 0.13 0.15 30 0.15 0.15 60 0.3 0.15 30 0.15 0.3 30 0.15 0.15 30 0.15 0.15 60 0.3 0.15 60 0.3 0.15 30 0.15 0.15-0.3 30 0.15 Stations Stations Stations 0.15 15 0.15 0.3 60 0.3 0.3 - Wellcontrol barriers in wireline operations: Table 7-11 Wireline Primary well control system PRIMARY WELL CONTROL SYSTEM is defined as folows: External Well Control Equipment Wireline Slickline operations Stuffing box for solid wireline Braided cable Grease injection head with relevant sized flowtubes Openhole operations Hydraulic line wiper and stuffing box, if applicable Internal Well Control X X X Primary well control system for wireline operations is dependant on type and size of line and is located above the secondary well control system Table 7-12 Wireline secondary well control system SECONDARY WELL CONTROL SYSTEM is defined as folows: Equipment External Well Control Wireline Slickline One wireline ram One wireline ram (inverted) A double valved kill inlet connection shall be included in the rig up during a live well intervention One combined shear/seal ram 7-56 X Braided or electric line X X X X X X http://www.petrom.com Internal Well Control 2012 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 7. TECHNOLOGICAL OPERATIONS 7.6.2 Type of WL Operations and Interventions In the case of H2S presence during the wireline operation, here below is the table with required actions: Table 7-13 Wireline operation in sour environment 7.6.2.1 Logging (Wireline or TLC) WL logging operations are complex operations related to evaluation of drilled through zones. Deployed tools are working on principles of resistivity, radioactivity, acoustic, temperature or other phenomena. This WO BP chapter is not dealing with description of logging operations. WL tools used for logging operations are mentioned in the section WL tools and equipment (Appendix 7-A). Further details and information are available from WL service providers or other sources and literature. 7.6.2.2 Running and Setting Permanent Packers LOGGING VERSUS DRILLER DEPTH The following procedures should be followed when reporting Electric Logging and Perforating depths: • All casing, tubing and associated equipment, such as packers, SSSVs, etc. will be reported as Driller’s Depth (DD) and measured in feet from DF, Derrick Floor. http://www.petrom.com 7-57 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS • • All depths associated with electric line operations, such as logging, perforating, setting packers, setting plugs, etc. during drilling of a well, should be reported as Logged Depth or Loggers Depth (LD) and referenced to the DF. All measurements that have both a DD and LD should be properly labelled to differentiate between them. As an example, a packer is set on electric line at a particular depth and is tagged when landing the tubing at a different depth. It is therefore imperative for all reports, such as Daily Drilling reports, Well Completion Reports, etc., to contain the proper depth labelling to eliminate possible confusion. 7.6.2.3 Perforating Perforation technology is described in the Chapter 6. PERFORATING. 7.6.2.4 Tubing Punching or Cutting (Explosive or Chemical) Wireline tubular punchers are used to create a hole or orifice in tubulars to establish communication between the inside and outside. Punchers are often used to punch holes in tubing or drill pipe to establish circulation, in casing to squeeze cement behind pipe, and other uses. Mechanical and explosive tubing punchers are currently available in OMV Petrom. Explosive Type Puncher A one-foot section of tubular is usually perforated with 4 or 6 shots per foot of explosive charges as desired. The important criteria for explosive punching is creating holes large enough and with the desired penetration objective (i.e. between one and four casing strings) to .be able to pump fluid or cement through them with ease. Mechanical Type Puncher A mechanical puncher or perforator which can be used with wireline, under pressure, to perforate both standard and heavyweight tubing. Wireline service suppliers provide this service to the rigs when called upon. Suppliers & Specifications Schlumberger and Weatherford are the two Petrom suppliers of explosive tubular punchers. When requesting Tubing Puncher service, the same requirements apply as perforating service. General Comments There is a concern that a second outer pipe (usually casing) can get penetrated or deformed if excessive explosive charges are used and the pipes are in contact with each other at the perforating location. Safety Concerns and Precautions Since explosive charges are used to punch holes in tubulars, the same safety concerns are applicable as for perforating. Most commonly used wireline tubing perforation services are: • Freepoint Indicator, • String Shot, • Chemical Cutter, and • Jet Cutter. 7-58 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 7. TECHNOLOGICAL OPERATIONS 7.6.2.5 Production logging tools (PLT) Production logging is operation related to evaluation of fluid influx from different zones in vertical or horizontal wellbore. PLT tools are combinations of different types of pressure, temperature, resistivity or radioactive and flow measuring devices. Modern & sophisticated PLT tools are available on the market under different trade-mark names, like the Schlumberger’s FSI (Flow Scan Imager). Evaluation of PLT measurement data will provide understanding of influx of oil, water or gas, may explain the cross-flow between zones, source of unwanted water production, etc. PLT tools are deployed either on wireline or CT. Standard way is the WL deployment, but limitation is the well deviation & angle. For highly deviated or horizontal wells, the use of WL is possible only be deployment of WL tractors; these are devices which are basically pulling (towing) the WL PLT tool to the TD of the wellbore. When CT is deployed for the PLT operation, in most of cases the PLT tool is a memory mode type; the data are recorded and after CT and PLT tool are pulled to surface, those data are downloaded and interpreted. Of course in memory PLT mode, there is no real time monitoring, thus no possibility for changing the program or logging schedule based on actual developments in the wellbore. PLT operation may be executed on either producer or injector wells. For producer wells the production must be maintained on required (by PLT program) rate. If the well is naturally flowing, PLT operation is relatively simply. In the case well requires some AL method, the operation becomes more complex; the AL modes which allow PLT operation are gas lifting, jet pumps or ESP pumping (here is a special ‘Y’ tool needed, as part of the production ESP string). All other AL methods, where is a ‘work string’ (like sucker rod, plunger, cable) installed inside the tubing, the PLT operation is not executable. In special cases CT can be used as a PLT tool deployment string, and at the same time Nitrogen can be injected through CT for lifting (producing) the well (Nitrogen lift). 7.7 Operation in sour environment Table 7-14 H2S concentration alert levels Alert level H2S Concentration [H2S] Comments Level 0: [H2 S] = 0 ppm Level 1: 0 ppm < [H2 S] < 10 ppm Level 2: 10 ppm < [H2 S] < 100 ppm (but not on drill floor) Normal operations Normal operations, but increasec alertness, prepering for next level. Restricted acess to affected areas. Restricted acces and breathing apparatus required in affected arreas [H2 S] > 10ppm. Non-essentional personal removed from rig package. Immediate action taken to reduce mud H2 S levels. Level 3: 10 ppm < [H2S] < 100 ppm (on the drill floor) Approaching an emergency situation. First alarm at 10 ppm, high alarm at 20 ppm [H2S] > 100 ppm Action taken to reduce H2 S concentrations have failed and an emergency situation has been reached. This is not necessarily an uncontrolled release but would include uncontrolled releases [H2 S] Emergency http://www.petrom.com 7-59 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 7. TECHNOLOGICAL OPERATIONS Appendix 7-A Common WL Tool Combinations 7-60 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 7. TECHNOLOGICAL OPERATIONS http://www.petrom.com 7-61 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 7. TECHNOLOGICAL OPERATIONS 7-62 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 7. TECHNOLOGICAL OPERATIONS http://www.petrom.com 7-63 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 7. TECHNOLOGICAL OPERATIONS 7-64 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 7. TECHNOLOGICAL OPERATIONS http://www.petrom.com 7-65 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 7. TECHNOLOGICAL OPERATIONS 7-66 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 7. TECHNOLOGICAL OPERATIONS List of Figures Figure 7-1 Slickline operation on wellsite, Figure 7-2 Slickline unite, Figure 7-3 Stuffing Box and a Mono-Block slickline BOP stack, Figure 7-4 S/L BOP Operating system and Control Panel, Figure 7-5 Slickline weight and depth indicators (mechanical), Figure 7-6 S/L Lubricator system packed for offshore loading, Figure 7-7 Illustration of wide variety of components used for S/L lubricator system, Figure 7-8 Slickline tool box, Figure 7-9 Slick line equipment rigged up and ready for deployment; note the three well control barriers in green text, Figure 7-10 Calculation of RKB Vs CF or GL elevation, Figure 7-11 a) CAMCO MMG side pocket mandrel, b) GL well completion and operation of the kick over tool, Figure 7-12 Sliding sleeve door, Figure 7-13 Tubing punchers – propellant driven and mechanical ones, Figure 7-14 a) The electromechanical downhole power unit; b) The electromechanical tubing punch in the “ready-to-run” position; c) The electromechanical tubing punch in the “blade-extended” position (max. position extended, which cuts through the tubing wall and creates a hole in tubing); d) The electromechanical tubing punch in “fully-retracted” position after the hole has been cut (The tool is ready to travel back up the hole), Figure 7-15 Kinley sand line cutter, Figure 7-16 Schlumberger ‘LIVE Digital Slickline Services’ platform, Figure 7-17 Rigless and rig-assisted CT Operations, Figure 7-18, Figure 7-19 Coiled tubing connection to pumping manifold, Figure 7-20 Power pack system, Figure 7-21 Control Panel, Figure 7-22 Typical CT BOP configuration, Figure 7-23 Proper rig-up of the CT reel and injector head, http://www.petrom.com 7-67 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS Figure 7-24 Chain Tension Pressure vs. Snubbing Force Chart, Figure 7-25 a) Zonal Isolation; b) Recompletion; c) Lost Circulation; d) Abandonment, Figure 7-26 CT cement squeeze (primary casing cement remedy), Figure 7-27 Weatherford’s CT milling flow process chart, Figure 7-28 Well test manifold with one fixed and one adjustable choke assemblies, Figure 7-29 Long PLT tool string and lubricator, Figure 7-30 CT used for deployment of different types of plugging devices, Figure 7-31 Physical properties of liquid and gaseous nitrogen, Figure 7-32 Nitrogen tank with Nitrogen pumping unit (red) working with CT unit (yellow) on 4338 Mamu well, Figure 7-33 Hydrostatic head of foam with different foam qualities, Figure 7-34 Hydrostatic head of the gaseous Nitrogen column as the function of depth and WH pressure, Figure 7-35 Dafora snubbing unit, WO rig assisted (Romgas, Romania), Figure 7-36 Snubbing unit (stand alone) and the key elements of a SU, Figure 7-37 Pulling & pushing slips and the spherical BOP of a SU, Figure 7-38 The BOP configuration of a SU; the ‘gin’ pole and work platform, Figure 7-39 Operator console and the big stand alone SU with working platforms, Figure 7-40 Rotary device for SU, Figure 7-41 Snubbing unit BOP equipment rig up options, Figure 7-42 Speed limits. 7-68 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 7. TECHNOLOGICAL OPERATIONS List of Tables Table 7-1 Slickline diameters, Table 7-2 Recommended slicklines, materials and their breaking strengths (in lbs), Table 7-3 Slickline metallurgy and applications, Table 7-4 Downhole plugs requirements for different pressure containing operations in/on the well, Table 7-5 Some CT Records, Table 7-6 CT Primary well control system, Table 7-7 CT Secondary well control system, Table 7-8 Snubbing primary well control system, Table 7-9 Snubbing secondary well control system, Table 7-10 Wireline logging operations, Table 7-11 Wireline Primary well control system, Table 7-12 Wireline secondary well control system, Table 7-13 Wireline operation in sour environment, Table 7-14 H2S concentration alert levels. http://www.petrom.com 7-69 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 7. TECHNOLOGICAL OPERATIONS References Well Completion Best Practices Reports (programming, execution, HO, etc.) Wells: 4316 and 4320 Mamu; Petrom, Romania Technology and Technics for performing various WO operations (cementing, acidizing, milling, fishing etc) by using CT; Weatherford, International DRAFT Petrom Slickline Operations; Petrom DA, Romania Cementing with Coil Tubing SOP; Weatherford, International Coil Tubing Acidizing SOP; Weatherford, International Coil Tubing Circulation SOP; Weatherford, International Coil Tubing Rig Up and Pressure Testing Procedure; Weatherford, International Coiled Tubing Surface Equipment; Weatherford, International Composite Plug Milling Using CT; Weatherford, International Fill Clean-out SOP; Weatherford, International Run In and Pull Out Hole Procedure with W/L; Schlumberger, International Tubing Cutter Procedure by CT; Weatherford, International Wireline SOP PETROM_V4 0; Schlumberger, International Slickline Wire Quality (Adjud 20 well testing operation); Petroserve, Canada Horizon ATEX 180K Nitrogen Pumping Unit; Weatherford, International HETS Internal Casing Patch; HETS, USA Eni Agip Drilling and Workover Manual; ENI-AGIP, Italy ENFORM Slick Line Operations IRP; ENFORM Forum, Canada DOWELL Nitrogen Services Manual; Schlumberger, International Saudi Aramco Workover Manual; Saudi Aramco, Saudi NORSOK Well Intervention Standards; NORSOK, Norway Workover Handbook MOBIL Completion Handbook; Mobil-Texaco, USA Petroleum Engineering Handbook; PenWell, USA 7-70 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 8. WELL REPAIR 8. WELL REPAIR Contents EXECUTIVE SUMMARY ......................................................................................................................... 8-1 8. WELL REPAIR .................................................................................................................................... 8-3 8.1 Introduction to Well Repair ..................................................................................................... 8-3 8.2 Preparation for Fishing ............................................................................................................ 8-4 8.2.1 Casing Repairing Tools: Swages and Casing Rollers.......................................................... 8-7 8.2.2 Casing Scrapers ................................................................................................................. 8-7 8.2.3 Fishing Magnets ................................................................................................................ 8-7 8.2.4 Junk Subs and Junk Baskets .............................................................................................. 8-8 8.3 Milling Tools ........................................................................................................................... 8-10 8.3.1 Mills ................................................................................................................................ 8-12 8.3.2 Milling & Rotary Shoes ................................................................................................... 8-15 8.4 Fishing Tools and Accessories ................................................................................................ 8-19 8.4.1 Lead Impression Blocks................................................................................................... 8-19 8.4.2 Releasing Overshot ......................................................................................................... 8-20 8.4.3 Die Collars ....................................................................................................................... 8-22 8.4.4 Releasing Spear............................................................................................................... 8-23 8.4.5 Taper Tap ........................................................................................................................ 8-24 8.4.6 Drill Pipe Safety Joint ...................................................................................................... 8-25 8.4.7 Washover Safety Joint .................................................................................................... 8-26 8.4.8 Fishing Bumper Sub ........................................................................................................ 8-27 8.4.9 Hydraulic Fishing Jars ...................................................................................................... 8-29 8.4.10 Jar Intensifier .................................................................................................................. 8-29 8.4.11 Surface Jars ..................................................................................................................... 8-30 8.4.12 Wireline Spears ............................................................................................................... 8-30 8.4.13 Free Point Instrument and Pipe Back-off ....................................................................... 8-32 8.5 Cutters.................................................................................................................................... 8-33 8.5.1 Jet Cut ............................................................................................................................. 8-33 8.5.2 Chemical Cut ................................................................................................................... 8-33 8.5.3 Mechanical Cut ............................................................................................................... 8-33 8.6 Fishing Tools Configuration ................................................................................................... 8-37 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 8. WELL REPAIR 8.7 Fishing Technology Workflow ................................................................................................ 8-39 8.8 Casing Patches........................................................................................................................ 8-40 8.8.1 Hole Preparation for Casing Patching ............................................................................. 8-42 8.8.2 Running and Setting the Casing Patch ............................................................................ 8-43 8.9 Scab Liner ............................................................................................................................... 8-45 8.10 Liner Tie Back to Surface ........................................................................................................ 8-45 8.11 Cemented Tubing Completions.............................................................................................. 8-45 8.12 Casing Repair Technology Workflow...................................................................................... 8-47 List of Figures ...................................................................................................................................... 8-48 List of Tables ....................................................................................................................................... 8-49 References .......................................................................................................................................... 8-50 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 8. WELL REPAIR EXECUTIVE SUMMARY EXECUTIVE SUMMARY: 8. WELL REPAIR No. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Strongly Recommended Only specially trained, skilled and dedicated technical personnel should have leading role in well repair operations. Well site supervision should be also performed by dedicated specialist. Only certified and checked equipment and tools should be deployed for well repair operations. Certifications are in the range from in-house Petrom up to internationally recognized standards. Before starting fishing operation a detailed fishing diagram must be prepared. Fishing plan and list of needed fishing tools. Minimum content ‘fishing basket’ must be always available for WO operation. Always run jars with casing swages or casing rollers; they may become stuck easily. Use packer retrieving milling shoes to mill away the slips of a production packer without damage to the casing; the remainder of the packer can be retrieved easily. When planning packer milling, specific information about packer size, packer type, casing size and weight must be known. Washover or milling operations should begin at a moderate speed and low weight, increasing both until the desired or optimum penetration rate is attained. Never mill faster than it is possible to remove cuttings. If bird nesting occurs, pull up and circulate until proper cutting return is achieved. Properly engage an overshot on a fish, slowly rotate the overshot as it is lowered onto the fish. A pump may be engaged to help cleaning the fish and also to indicate when the overshot goes over the object; pump pressure change should also indicate engagement onto the fish. When used in fishing operations the fishing jar should be installed immediately below the drill collars string. For maximum effectiveness of jarring, a Jar Intensifier should be installed about four drill collars above the jar. The wireline center spear, the two-pronged wire grab or the crank shaft spears are used to remove parted wireline from the wellbore. When the tools are used in casing a guide should be run above the tool to prevent the wire from getting above the spear from a fish. When patching split casing it is recommended that the patch is of sufficient length to cover the split plus 6-8 feet (1.8-2.5m) overlap on each end. A casing scraper run is mandatory recommended before setting a patch to ensure the area is clean. http://www.petrom.com 8-1 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 8. WELL REPAIR EXECUTIVE SUMMARY: 8. WELL REPAIR No. 1. 2. 3. 4. 5. 6. 7. 8. 8-2 Not Recommended at All Never go for well repair, if the cost of repair is higher than sidetracking or drilling a new well. When fishing, it means: if the [cost of fish + cost of sidetrack] is less than [cost of fishing + cost of eqmt repair after fishing], do not proceed with fishing. Never start well repair operation without having full well history and current well status gathered, evaluated and determined route cause for the damage. Never run steel milling operation without having magnets and junksubs for catching and removing the milled metal particles from the WO fluid. Avoid milling of the fish with use of oil based WO fluid. Drill collars must be part of milling BHA, to secure the necessary weight on mill for good penetration and long life of the mill. Apply as high as possible fluid flow rates while milling. Keep RPM between 60 & 170. Never allow a piece of junk to lodge next to the mill. Force it down by spudding the mill. A noticeable increase in torque will indicate that junk is alongside. Limit the use of die collars; the disadvantage of a die collar lies in the fact that it cannot be disengaged from the fish in the event that it proves impossible to pull the fish. Furthermore, it is difficult to gauge the amount of torque required for its operation. Insufficient torque results in an insecure hold; too much torque can result in distortion of the fish and damage the tool to such an extent that engagement is lost. Never operate the chemical cutter in dry pipe; it requires at least thirty meters of fluid above the tool when a cut is made. Avoid surging of pump pressure when starting external cut. Pressure surging causes the string length to contract and expand, moving the cutter up and down. This motion prevents the knives from remaining in one position when starting a cut. A rough chattering action followed by the smoothing of the rotary will signal the completion of the cut. http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 8. WELL REPAIR 8. WELL REPAIR 8.1 Introduction to Well Repair A damaged producer or injector well is no further safe for operation in most of the cases and some kind of well repair or subsurface intervention is there required. The damage of the well occurs mainly due to corrosion or due to some induced forces. Result is losing the well pressure integrity or/and restricted access to the bottom of the well. Another type of a damaged well is the well with some undesirable object (called ‘fish’) left in the well; situation when the fish is actually preventing / limiting further production or access to the reservoir. Corrosion is the most common type of a damaged well, where production tubing and casing, or the wellhead looses it’s sealing capability and the entire well pressure integrity is lost. The most common indication of this type of well damage is sudden pressure increase on some of the casing annuluses. Corrosion may be either from the produced fluids (internal) or from the external, corrosive water layers surrounding the well. In some cases the entire tubing or casing string can be severely corroded. Damage of the well due to induced forces may be from the well itself, due to temperature or pressure generated forces in the tubular or annular spaces during life of the well. This cases are cooling effect and excess tension in tubular during stimulation jobs, heat generated extra pressures in annulus spaces filled with liquid during steam injection process, improper space out of a latched completion string to the packer, and some others. In some cases forces detrimental to the well are induced from surface, by applying excess pressure or tension during well operations. Examples of this kind of well damages are pressure testing of the casing annulus, frac jobs, perforation, setting the packers with extra over-pull, drilling or milling inside the casing with not appropriate tools, and some more. Well Preparation for Well Repair Services Well repair is very complex, risky and time and money consuming WO operation. It requires skilled personnel and special tools and equipment. Well repair operation generally should proceed only if the cost of the well repair operation – with all risks being accounted! – is less than the cost of a sidetrack or drilling a new well. First and most important step in the well repair operation is to assess the actual situation in the well, get clear understanding of the problem, it’s route cause and severity of the damage. As many as possible details should be collected regarding the damaged well, equipment installed (or left in hole), surrounding formations (rocks and fluids), and other data. http://www.petrom.com 8-3 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 8. WELL REPAIR After proper assessment of the situation in the well a plan is being prepared for well repair operation. Based on equipment, techniques, tools, personnel requirements it is possible to work out the cost estimate of the well repair operation. Only after comparing the estimated repair cost Vs alternative options a decision for proceeding further with well repair should be made. Well Repair Tools Used in Petrom OMV In OMV-Petrom there is a wide variety of tools, equipment and accessories used for well repair operations. Some operations are managed entirely by Petrom, while in some cases there is involvement of an external service provider(s). OMV-Petrom tools are in some cases not up to the latest technical standards and requirements. Also there are no dedicated well repair specialists available in house for some more complex well repair operations. A direct consequence of these is low efficiency and poor profitability of OMV-Petrom well repair operations and services. 8.2 Preparation for Fishing The word ‘fish’ describes any undesirable object in the well bore that must be removed. The equipment required to clean out the hole or to remove an unwanted object is called a fishing tool. When a need for fishing job develops, all WO progress ceases and tools and procedures must be utilized to remove the fish. Failure to recover the fish can require sidetracking or even abandoning the well. In general fishing is always the direct consequence or the combination of: • • • • • deficiency in equipment, human error or human negligence during operation, not properly adapted / aligned program, unforeseen wellbore conditions, and poor well design (covering the entire well life). The costs and inherent risks when fishing make it imperative that the operations and engineering personnel involved communicate freely. Predicted additional cost and risk in certain types of fishing operations can make it necessary to change the entire WO job plan and WO objective(s). Factors that should be considered when planning a fishing job are: • • • • • • 8-4 The mechanical condition of the wellbore tubular and the fluids or solids that they contain. Knowledge of the size, amount and type of the fish (all dimensions are important; the best is to prepare a detailed fishing diagram); the reliability of the information provided for fishing is essential. Location of the fish (depth, inclination, available free space around the fish, fish free to move/rotate…); an accurate and detailed well schematic is essential. Availability and disposability of fishing tools and equipment. Involvement of knowledgeable and skilled fishing specialists and workers. Estimated fishing WO cost, probability for success and risk of failure. http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 8. WELL REPAIR The rough calculation for decision to fish could be summarized as: A = Cost of the fish (equipment) left in hole or cost of the deferred CH production B = Cost of the side track operation (or drilling a new well) C = Estimate internal (in-house) cost spent for fishing operation D = Cost of Fishing Service Companies (rental of equipment, services) E = Cost of equipment to be repaired after fishing (if plans for it) Evaluating above categories may result in: If: A+B > C+D+E → fishing is advised and/or can continue If: A+B = C+D+E → fishing is not advised (or further evaluation is needed) If: A+B < C+D+E → fishing is not advised or must be stopped Advise: If there are no required equipment on the well site or in the base, do not hesitate to eliminate fishing solution; proceed to alternative options immediately (side-track). Remember that Fishing is always a great consumer of materials. Do not improvise! Fishing operations must be realised under control of a competent and experienced engineer with required tools and equipment. One of the most common types of fishing jobs is created when the work string, tubing or sucker rod string parts or is twisted in two. By carefully measuring the string that has been removed from the hole, the operator knows the depth at which he must engage the fish. By carefully examining the end piece brought from the hole, the operator can determine the type of the fish (drill collar, drill pipe, tubing, tool joint, coupling, external upset section or plain pipe, packer, etc). Although the outside diameters are generally known, it is good practice to caliper the work string at the nearest tool joint to the fish, if string had been worn to a smaller size than their original outside diameter. The size of the hole or casing at the depth of the fish will provide information regarding the amount of room that is available to accommodate the required fishing tool or equipment. The first requirement will be to select a suitable tool to engage the fish. If there is sufficient operating clearance, the fishing tool selected should be one that will engage the fish externally. If there is not sufficient clearance to externally catch the tool an internal catching tool should be selected. For relatively simple, straightforward fishing jobs such as the recovery of pipe inadvertently dropped or left in the hole, an overshot can be used for fast, inexpensive recovery. For more complicated jobs - such as recovery of stuck, cemented or plasticized pipe, or recovery of several wire line tools with the wire line on top of them, or removal of permanent packers - some special fishing tools and skills will be required. When cases such as these arise, an experienced fishing-tool operator should be considered. Reliability of the information available is essential. Before and during fishing operations, collected and reported information must be exact and accurate, detailed as much as possible. Time criteria must be seriously considered (especially when deploying 3rd party WO rig); it is in the cost parameters named "C" above. http://www.petrom.com 8-5 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 8. WELL REPAIR In all cases, before fishing operation commencement the following information should be prepared: • • • • • • • • • Dimensional sketch of the hole with geological stage and casing shoe depth. Dimensional sketch of the string in hole (length, OD, ID ...). Detailed fishing diagram (with all dimensions and other details of the fish). Circulating volume, string volume, casing annulus volume in details. Elastic limit and torsion limit of work string and it’s elements. Last value of Shoe Bond Test or the casing Leak-Off test Problems encountered during previous drilling or WO. The fish cost details (in detail for each section) List of fishing tools and equipment available on rig site; and possibility to obtain more equipment (and their possible sources). Categories of Fishing Tools All fishing tools can be categorized based on the working principle or on the type of the fish for what these tools are used. Here bellow is the list of fishing tool categories: • • • • • • • • • • • • Well Integrity Repairing Tools, Junk Fishing Tools, Milling Tools, Washover Tools, External Catching Tools, Internal Catching Tools, Safety (Separation) Joints, Jarring System (Fishing Jars, Jar Accelerators, Bumper Subs), Internal Pipe Cutting Tools, External Pipe Cutting Tools, Cable Fishing Tools, and Back-Off Tools. • • • • • • • • • Millings tools, Magnets, Junk subs, Junk baskets or reverses circulating junk baskets, Overshot, Taper tapes , Hydraulic fishing jar, Bumper sub, and Safety joint. Below is the list of minimum recommended fishing equipment required on a WO rig prior conducting the fishing operations (the so called ‘fishing basket’): In the text bellow is given the short description and area of application and use of different fishing tools. 8-6 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 8. WELL REPAIR 8.2.1 Casing Repairing Tools: Swages and Casing Rollers Before proceeding to this type of well repair it is essential to assess the casing damage; a multi-finger caliper log or a drift run will provide necessary information for planning the job. Casing swages are heavily tapered cones which can be driven through the collapsed casing and jarred back out. It is usually necessary to run several sizes in sequences, as the pipe must be swaged out in small increments, sometimes as little as ¼ inch (6.4mm). Most collapsed casing can be swaged out to approximately 1/8 inch (3.2mm) below the drift diameter. Casing rollers were first made as adaptations of the swage mandrel by merely adding a series of rollers. It is a simple tool for restoring buckled, collapsed or dented casing to its normal diameter and roundness. The tool is rotated slowly and lowered gradually through the casing until the damaged area is located. Upon contact with the collapsed casing, the rotary speed is increased to between 50 and 75 rpm, circulation is established and the roller lowered slowly. The operation of swaging or rolling is rather severe. One should always run the jars and drill collars in either procedure since they can become wedged in the collapsed pipe and must be jarred loose. Once the casing is opened sufficiently, it is usually squeeze cemented or an inner liner run to support the weak casing section. 8.2.2 Casing Scrapers Casing Scrapers are used for all types of scraping operations. They will remove cement, mud cakes and asphaltens, as well as perforation burrs and similar obstructions from the casing inner wall. The Scraper is a simple and rugged tool. It employs hardened steel blades set in a pattern, which provides 360 degrees of coverage three times, in its working length. No springs, screws or other small parts are used in these tools which could get damage or lost during operations. The tool may be either rotated during operation or spud up or down with equal effectiveness. Full circulation may be maintained at all times through the tool, although circulation is not required for it’s operation. The tool allows it to easily enter liners down-hole or re-enter the bottom of the liner, should it pass through the bottom. The most commonly used casing scrapper is the Bowen type casing scraper (as seen on the picture bellow) or some of similar variations of this tool. Casing scrapers are often combined with junk subs positioned straight above the scraper, for collecting heavy debris from scrapping. 8.2.3 Fishing Magnets Fishing magnets (Figure 8-3a) are either permanent magnets fitted into a body with circulating ports or electromagnets which are run on a conductor line. Permanent magnets, as shown, have circulating ports around the outer edge so that fill and cuttings can be washed away and contact made with the fish. Ordinarily the magnetic core is fitted with a brass sleeve between it and the outer body so that all of the magnetic field is contained and there is no drag on the pipe or casing. Permanent magnets have the advantage of the circulation washing away any fill so that the junk is exposed. Ordinarily, by rotation, one can detect when contact is made with the fish. The operator should then thoroughly circulate the hole, shut the pump off, and retrieve the fish without rotation. Magnet (run on workstring or wireline) is used for retrieving small as well as oddly shaped junk with magnet attraction from a well bore. http://www.petrom.com 8-7 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 8. WELL REPAIR Figure 8-1a) Casing Swages; b) Casing Roller; c) Bowen Casing Scraper) 8.2.4 Junk Subs and Junk Baskets These tools (Figure 8-3b) are used in work over during drilling or milling operations to catch small objects and pieces of junk. Normally run just above the drill bit or the mill, have a cup for catching objects too heavy to be completely circulated out of the hole. This is particularly advantageous in junk milling operations. By running a Junk Sub above the scraper, operators can get quicker, cleaner scraping jobs. Junk Subs are constructed from high quality steel, completely stress-relieved after cup and rib guides have been welded to the main body. Rib guides prevent the Cup from becoming crushed and help guide the tool through tight places upon withdrawal from the hole. There are three main types of junk subs, as follows: 8-8 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 2012 8. WELL REPAIR Boot Type Junk Sub normally run just above the drill bit or mill, utilizing a cup for catching objects too heavy to be completely circulated out of the hole such as cuttings from milling operations. The boot basket is available in a complete range of sizes with API Regular connections. Finger Type Junk Sub utilizes free-spinning finger type catchers to retrieve all types of small objects in the wellbore. Manly are used with a variety of mill shoes to mill over and retrieve objects. Ditch Magnets are used on surface to catch all steel particles before flowing to the sieves or pump intake. Ditch magnets are available in a wide variety of sizes and types. Figure 8-2 Ditch Magnets Core-Type Junk Basket The Core-Type Junk Basket, as shown (Figure 8-3c), was the old stand-by for years for fishing bit cones and similar junk from the well. It consists of the top sub, a barrel, a shoe, and usually two sets of finger-type catchers. This tool is still used quite often; it is made to circulate out the fill and even to cut a core in the formation. The two sets of fingers help to break the core off and retrieve it. Any junk that is in the bottom of the hole is retrieved on top of the core. Figure 8-3a) Fishing Magnet; b) Junk Subs; c) Core Type Junk Basket http://www.petrom.com 8-9 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 8. WELL REPAIR Reverse Circulation Junk Basket The reversing action is extremely helpful in lifting junk into the barrel and catcher that might otherwise be held away from the catcher by fluid flow. The reverse circulation junk basket design incorporates an inner barrel with the fluid flow between the outer and inner barrels when a ball is dropped and closes off the centre flow through the seat. With this design, when the ball is circulated down, the flow is diverted between the two barrels and reverse circulation flow is created back up the inside of the junk catcher with the fluid exiting into the annulus through the upper ports near the top of the barrel (see bellow sketch). Reverse Circulation Junk Basket (Figure 8-4) is used to retrieve various kind of oddly shaped junk from a well bore such items as slips, hand tools, bit roller balls, rock bit cones, packer slip pieces, rubber element pieces, etc. with help of circulation to collect the junk. Several types of catchers can be utilized in some cases, to increase the catching effectiveness. a b Figure 8-4 a) Reverse circulation junk basket; b) Reverse Circulating Junk Basket with Replaceable Junk Catchers (two) 8.3 Milling Tools These tools are used for milling away a junk or a fish which cannot be removed by conventional fishing tools. Milling means to cut, grind, pulverize or break down metal into smaller particles. These particles are then circulated up the annulus. Mills are used to cut objects that either fall into the hole or get stuck and require removal from the hole or can mill away entire casing sections. Mills are normally built with high quality tungsten carbide called hard-facing. Hardfacing material is composed of crushed sintered tungsten carbide particles compounded with a matrix of nickel-silver alloy, and hardfacing is applied with oxygen acetylene welding equipment. 8-10 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 8. WELL REPAIR During milling operations, when a hardfaced tool is lowered and rotated against an object, a fish, formation or cement, small tungsten carbide particles imbed themselves into the object. Each tungsten carbide particle creates a small chip along the edge as it is moved along the object, cutting the object. As a particle’s cutting edge becomes dulled, pressures and strains increase causing the particle to fracture and fall off. Such fractures then create a new cutting structure. Once the particle falls off, a new particle in the matrix takes its place as the cutting edge. This process continues until all the hardfacing is exhausted. The hardness of tungsten carbide is almost that of diamonds. It retains its hardness at high temperatures and is not affected by the heat generated by cutting operations. The resilient nickel-silver alloy matrix securely holds the tungsten carbide particles together and in place and cushions the particles against impact forces. Hardfacing is made in two types, cutting type and wear type. Cutting type tungsten carbide hardfacing is used as the cutting surface in mill shoes, rotary shoes, junk mills, and milling stabilizer construction. Tools dressed with hardfacing are used to mill away all kinds of junk including drill pipe, drill collars, bit cones, casing, liners, and liner hangers. Wear type is used for wear resistance on stabilizers, roller reamer bodies and hole opener saddles and bodies. Use of Milling Tools Most milling tools are simple to operate. Relatively fast rotary speeds should be available as well as drill pipe and drill collars. Rotary speeds may vary from 60 to 175 RPM. Higher rotary speeds are used with smaller diameter mills and slower RPM with larger mills. Rotary speeds are best determined in the field during operations, being dependent on the size and the type of mill, hole conditions and depth, and the material to be milled. For maximum results, the mill should be run beneath a string of drill collars weighing anywhere between 10,000 and 15,000 lbs., depending on the size of the mill. Weight and RPM applied to the mill during operation will vary due to the size and type of mill, hole condition and depth and material to be milled. The volume and characteristics of the cutting should be checked frequently since they will provide a great deal of information about the milling progress. Best results are achieved with high volume pumps since high circulation rates will both flush and cool the milling surfaces and circulate the metal cuttings more efficiently to the surface. Annular velocity should be maintained at 80 - 120ft. (25-37m) per minute. The mud weight and viscosity should be adequate to lift the metal cuttings to the surface. Oil base mud should be avoided whenever possible. Ordinarily, no difficulty is encountered in circulating drilled cuttings under normal drilling practices. Milled cuttings are much heavier than normal drilled formation cuttings, therefore a ratio of plastic viscosity to yield point (PV/YP) as close to 1.0 is ideal for steel cutting removal. If the ratio is higher than 1.5, a common remedy is to add LCM to the mud. This will help to sweep the hole and aid in carrying the cuttings up the annulus and out of the well. Polymer mud is the best for milling operations, with clay based mud being a second choice and oil base mud being the last one. A ditch magnet or other method of surface metal cutting removal should be considered to prevent damage to surface equipment when the metal cuttings become excessive. If the cutting cannot be brought to the surface with the circulating system being used, then boot or junk baskets should be run just above the mill or drill collars to catch the cuttings. Application and running parameters for some mills are given here in the table below (Table 8-1): http://www.petrom.com 8-11 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 8. WELL REPAIR Table 8-1 Application and running parameters for some mills Mill Junk mill Pilot mill Economill Taper mill Rotary shoe Application Rock bit cones, general junk Tubular fish, cleaning of top of fish Packer, retainer, Cement Casing collapses, Cleaning of whipstock window Washing over pipe, Drill collars, Stabilisers, Packer Table speed Rpm Weight on tool Lbs 100 4000-10000 125 6000-10000 100 2000-8000 50-80 2000-4000 50-100 2000-6000 8.3.1 Mills Junk mill (Figure 8-5) is used to mill away metal objects in the hole that cannot be retrieved with grappling tools or junk baskets. These mills are the toughest mills and referred to as workhorses of downhole milling operations. The blade forms of all junk mills are designed so that they continuously cut, rather than sweeping the junk ahead of the blades. The junk mills selected should be 1/8 to ¼ in. (3-6mm) less than the minimum inside diameter of the casing or open-hole through which it is to be run. Run a junk sub directly above the mill. Have a minimum of 10,000 lbs. of drill collar weight available. Frequent spudding may be required to break up loose junk; this action will pound the junk down into the bottom, positioning it better for effective milling. Never allow a piece of junk to lodge next to the mill. Force it down by spudding the mill. A noticeable increase in torque will indicate that junk is alongside. Weatherford have designed an 8 bladed junk mill with a 3-deg. lay back on the cutters and a ½ in. offset nose from the centre. This mill has proven very reliable when milling up drillpipe. It can be used with a skirt on the outside to protect the casing when milling drill pipe inside casing. Figure 8-5 Junk mills with fishing neck Flat bottom mills (Figure 8-6a) are used to mill bits cones and other pieces of junk if they cannot be recovered by other means of recovery. Flat bottom mills normally have a concave face on the bottom to keep the junk centered under the mill. Round nose (Figure 8-6b) mills are used primarily to mill out the bottom of liners or casing which have been set with a bull plug during original completion. Round nose mills cut on the leading edge or nose, along the taper but not full circumference of the mill. 8-12 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 8. WELL REPAIR Taper mills (Figure 8-6c) are used primarily to mill collapsed pipe, to restore elliptical pipe to full bore, and to remove restrictions from the inside diameter such as landing seats, bushings, and other metal objects that might restrict the well bore. Taper mills have cutting structures along the taper. Often taper mills are used for establishing gage diameter, milling collapsed casing, preparing a fish for internal engagement or cleaning of whipstock window. a b c Figure 8-6 a) Flat bottom mills; b) Round nose, c) Taper mills) Watermelon mills (Figure 8-7a) or string mills are used to open up tight spots in pipe, to enlarge and clean up a window cut in casing, or in some circumstances to run in collapsed casing that has been partially opened up. With a guide below the mill, it will not go outside as is possible with a tapered mill. Piranha mills (Figure 8-7b) are used solely for the removal of downhole casing strings. The effecting milling weight has been found to be 5,000-10,000 lbs. with Piranha mills. Stabilization is necessary with this mill. A sleeve type stabilizer is included in the tool’s design. The OD and stabilizer diameter is sized to prevent damage to the outer casing strings. Refer to the mill handbook for further details. Pilot mills (Figure 8-7c) are used primarily to mill up wash pipe, safety joints, crossover swages, drill pipe, casing, liners and washover shoes in the hole. The stinger can be equipped with a retrieving tool on the bottom. In selecting a pilot mill, the blade OD should be about 1/4 in. larger than the OD of the tool joint or coupling to be milled. The pilot OD should be Economill (Bowen) (Figure 8-7d) is commonly used to mill packer, retainer or cement. Economill may be used stand alone or with shielded mill tool to cover and redress the head of the fish (if ‘damaged’). http://www.petrom.com 8-13 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 8. WELL REPAIR a b c d Figure 8-7 a) Watermelon mills; b) Piranha mill; c) Pilot mill; d) Bowen economill) Section Mills or K-Mills (Figure 8-8) are hydraulically actuated tools that are used to mill a section of casing or tubing. Circulation through the tool creates a pressure drop across the piston. This forces a cam down, expanding the knives into contact with the casing. Cut out knives firstly part the casing and then all knives are used to mill it. When circulation is stopped, the piston spring will lift the piston, withdrawing the cam from between the knives. The knives are now free to collapse back into the body and the tool can be retrieved. It is important to insure that the mill completely cuts through the casing (cutting out) so the blades can be firmly seated on casing while milling. If you experience a sudden drop in penetration rate of the mill, this may be attributed to a loose ring of steel from the casing coupling. This ring will rotate with the section mill. Lightly spudding the section mill should break up the ring. Pump rates for the K-Mill are pre-determined and depend on the tool size; refer to manufacturer handbook for the required flow rates for different K-Mill sizes. The correct pumping rate must be selected to produce the desired pressure drop through the K-Mill providing efficient tool operation. The most common cause of difficulty in cutting out is insufficient pressure at the tool. Approximately 300 psi (21bar) is required at tool to keep the cutting knives open and part the casing. Figure 8-8 section K-mill 8-14 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 8. WELL REPAIR 8.3.2 Milling & Rotary Shoes Milling shoes are used to mill over and free stuck packers, spears, GP filters, stabilizers, string reamers, rock bits or any metal objects which cannot be removed from the well by conventional fishing methods. Milling shoes and rotary shoes are used primarily to dress a fish so that grappling or a retrieving tool may engage the fish. Rotary shoes are excellent for washing over stuck pipe to cut away shale, clay, sand salt or limestone, cement, anhydrite, red beds and other formations, or over GP filters and pipes before removal from the well. Prior to milling always inspect the ID of subs to insure they are full-bore. While milling, the penetration rate is affected by hole conditions, the rotary speed, the weight of the drill string upon the milling shoe, the weight and viscosity of the drilling fluid, the dimensional size of the milling shoe, and finally the size and hardness of the material to be milled. Based on all of these variables, the optimum weight and RPM cannot be stated to obtain the most efficient penetration rate. Therefore the most efficient weight and RPM must be determined by actual operating conditions. Revolutions may vary from 75 to 150 RPM. Washover or milling operations should begin at a moderate speed and low weight, increasing both until the desired or optimum penetration rate is attained. Start with lowering the washover string into the well until the mill shoe is a few feet above the top of the fish. Start the pumps and circulate the hole until the top of the fish is clean. Either conventional or reverse circulation can be used. Reverse circulation is often desired because the velocity of the returns is greater and less settling of cuttings will take place. Normal pump pressures are recommended with the mud weight and viscosity being sufficient to circulate the cuttings out of the hole. If many metal cuttings are anticipated, a ditch magnet or other method of surface cutting removal should be considered to prevent damage to surface equipment like pumps. The volume and characteristics of the returned cuttings should be checked frequently since they will provide valuable information on what is being cut and on the washover procedure itself. In the event that penetration rate declines, it is advisable to change the weight or the rotary speed and in some cases spud on the fish might become necessary to re-establish the desired rate of progress. Milling tools are designed to mill away a stuck fish that cannot be retrieved by conventional fishing methods. Since milling is usually a follow-up operation (after several fishing attempts), the fish to be milled should be familiar to the operator and therefore the selection of the milling tool should be relatively easy to determine, since the dimensional restrictions of the well should be known. The milling tool selected should provide maximum exposure of the milling edge to the material to be milled, maximum replacement of the milling edge as wear occurs and maximum circulation to remove the cuttings. Milling operations begin by lowering the drill string down to within a few feet of the object to be milled. Start the pumps and circulate to remove any debris that might have fallen on top of the fish. Rotate at a moderate speed and slowly lower the drill string until the mill makes contact with the object to be milled. The first 30 minutes should determine how fast the penetration rate will be. The first 4 to 5 ft (1.2-1.5m) of a milling job is extremely critical, especially during section milling. Cuttings tend to accumulate at the cutting knife. This can cause bird nesting. Slowly increase the RPM and gradually increase the weight until an optimum penetration rate is achieved. Too much weight will merely grind down the carbide and matrix and prematurely dull the mill. Never mill faster than it is http://www.petrom.com 8-15 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 8. WELL REPAIR possible to remove cuttings. If bird nesting occurs, pull up and circulate until proper cutting return is achieved. Washover Pipe and Accessories Very often it is not enough merely to catch hold of the fish and pull. In those cases, wash pipe and a rotary shoe can be used to rotate over the fish to remove annular material that may be causing it to stick and free up a section of stuck pipe so that it may be retrieved. The outside diameter of the wash pipe must be small enough to run inside the casing, and its inside diameter must be large enough to fit over the fish. Wash pipe is therefore thin walled and the length of it run in the well must normally be limited to a few hundred feet. The rotary shoe is placed on the end of the wash pipe to drill-up and circulate out any material around the fish. Hardfaced Milling and Rotary Shoes Milling shoes and rotary shoes can be designed in various sizes and styles to meet various conditions encountered in well fishing and washover operations. Following are examples of mill shoes and rotary shoes (type A through K), with a brief explanation of their intended applications. NOTE: Different fishing manuals (Bowen, Servco, Smith, etc.) describe types of rotary shoes (A, B, C, etc.) differently; thus be sure and specify which model is required and which reference the source originated. Overshot milling shoes (Figure 8-9a) are used to mill away jagged metal from the top of fish so that the fish will pass easily into an overshot bowl. Packer retrieving milling shoes (Figure 8-9b) are used to mill away the slips of a production packer without damage to the casing so that the remainder of the packer can be retrieved. When planning packer milling, specific information must be known concerning packer size, packer type, casing size and weight. Junk basket milling shoes (Figure 8-9c) are used to capture and trap junk too heavy to circulate and mill away jagged edges from small junk or bit cones so that the junk will pass into the basket and be retrieved, or for formation cutting to cut small cores. a b c Figure 8-9 a) Overshot milling shoes; b) Packer retrieving milling shoes; c)Junk basket milling shoes 8-16 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 8. WELL REPAIR Type A rotary shoes (Figure 8-10a) are used to cut metal on the fish without cutting casing. It cuts only on the inside diameter (I.D.) and the bottom, does not cut on the outside diameter (O.D.). It can be used with wash pipe when washing over drillpipe and tubing. Type B rotary shoes (Figure 8-10b) are used for washing over a fish and metal and formation in the open-hole. It cuts only on the outside diameter (O.D.) and the bottom, and does not cut on the inside diameter (I.D.). Type C rotary shoes (Figure 8-10c) are used for washing over and cutting metal, formation or cement. It cuts freely only on the inside diameter (I.D.) on the outside diameter and on the bottom. Type D rotary shoes (Figure 8-10d) are used to cut metal on the fish without cutting the casing where clearances are limited. It cuts only on the inside diameter (I.D.) and the bottom, and does not cut on the outside diameter (O.D.). a b c d Figure 8-10a)Type A rotary shoes; b) Type B rotary shoes; c)Type C rotary shoes; d)Type D rotary shoes Type E rotary shoes (Figure 8-11a) are used for washing over a fish and cutting metal, formation or cement in the open-hole or casing where clearances are limited. It cuts only on the outside diameter (O.D.) and the bottom, and does not cut on the inside diameter (I.D.). Type F rotary shoes (Figure 8-11b) are used to size and dress the top of a fish inside the casing. It makes a tapered cut on the inside diameter (I.D.) and cuts on the bottom, and does not cut on the outside diameter (O.D.). Type G rotary shoes (Figure 8-11c) are used for washing over and cutting metal, formation or cement in the open-hole or casing with limited inside clearances. It cuts on the outside diameter (O.D.), the bottom, and on the inside diameter (I.D.). Type H rotary shoes (Figure 8-11d) are used for washing over and cutting metal in the open-hole or casing where clearances are limited. It cuts on the outside diameter (O.D.), the inside diameter (I.D.) and on the bottom. http://www.petrom.com 8-17 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 8. WELL REPAIR a b c d Figure 8-11 a) Type E rotary shoes; b) Type F rotary shoes; d) Type G rotary shoes; d) Type H rotary shoes) Type I rotary shoes (Figure 8-12a) are used for washing over and cutting formation only. Saw toothed design permits maximum circulation. It cuts on the bottom only. Does not cut on the outside diameter (O.D.) or the inside diameter (I.D.). Type J rotary shoes (Figure 8-12b) are used for washing over and cutting formation only. Saw toothed design permits maximum circulation. It cuts on the bottom and on the outside diameter (O.D.). Does not cut the inside diameter (I.D.). Type K rotary shoes (Figure 8-12c) are used for washing over and cutting on the bottom face only. Does not cut on the outside diameter (O.D.) or the inside diameter (I.D.). a b c Figure 8-12 a) Type I rotary shoes; b) Type J rotary shoes; c) TypeK rotary shoes 8-18 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 8. WELL REPAIR Recommended Weights and Speeds for Wash Over Operations Usually the most efficient rotary speeds are obtained by running the rotary at 80 to 100 RPM. Milling with washover shoes is an exception, they are usually more efficient when run at 60 to 80 RPM. High speed can burn or damage the tungsten carbide, which is critical to milling steel. Tungsten carbide cuts steel best at 3000 to 4000 in./minute surface velocity. The following formula determines the recommended rule of thumb minimum and maximum milling RPM’s, MIN/MAX RPM = Surface Speed/(Tool OD x 3.14). For example, for a 12 in. mill, Min RPM = 3,000/(12 x 3.14) = 80 RPM, Max RPM = 4,000/(12 x 3.14) = 106 RPM For optimum penetration rates, it will be necessary to try different rotary speeds, weights, and pump pressures. When the penetration rate slows down varying one or more of the above variables might be required to attain the desired penetration rate. Occasionally spudding on the fish might help. If the penetration rate cannot be increased to what it should be by varying some of the above mentioned variables or by light spudding, the mill might need to be pulled out of the hole because the hardfacing might be worn off. Cuttings Ideally cuttings should be 1/32 to 1/16 in. (0.8-1.6mm) thick ands 1” to 2” (25-51mm) long. If cuttings are long thin stringers, increase the milling weight. If fish scale type cuttings are being returned when pilot or section milling, the penetration rates will improve by decreasing weight and increasing RPM. Mill Stability and Rough Operation A mill that moves eccentrically does a poor job. Stabilize above the mill at 60 ft. or 90 ft. intervals. The stabilizer OD should not exceed the dressed OD of the mill. Section and pilot mills should also be stabilized to the drift diameter of the casing. When rough running and bouncing occurs, decrease weight, than slowly increase speed and weight until an acceptable Raugh Oeration (ROP) is obtained. If rough running reoccurs, once again decrease and then gradually increase to a maximum ROP. 8.4 Fishing Tools and Accessories As already mentioned there are several pre-conditions to be satisfied before commencement of any fishing operation. But before any fishing tool is selected or run into the well there must be clear understanding of the neck of the fish to be retrieved; the point where the fish retrieving toll shall be engaged to the fish. The most common way of getting the fish’s picture’ is to run a Lead Impression Block (LIB). Recently downhole video cameras are also frequently utilised to get the picture of the fish top. 8.4.1 Lead Impression Blocks Impression Blocks (Figure 8-13), which consist of a soft lead insert in the lower end of a steel housing, are used in fishing operations. They are designed to enable the operator to determine the configuration of the top of the fish and to locate its position in the well bore. Its use enables the operator to more precisely assess the fishing conditions and to more accurately select the proper tool or tools needed to successfully complete the fishing operations. The impression block is lowered into the well on the lower end of a fishing string of pipe. After the block contacts the upper end of the fish, the weight of the string is further lowered straight down (never rotate!) against the fish http://www.petrom.com 8-19 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 8. WELL REPAIR which indents into the soft lead lower end of the block. When the fishing string is withdrawn from the well, the impression in the lead will reveal the condition of the fish. Figure 8-13 Lead Impression Blocks with Different Indents 8.4.2 Releasing Overshot The Releasing Overshot is used to externally engage and retrieve all sizes of tubing, drill pipe, and casing. The overshot is designed to assure positive external engagement over a large area of the fish and is ruggedly built to withstand severe jarring and pulling strains without damage or distortion to either tool or fish. Most overshots consist of a bowl, top sub, guide and the grapple or slip, a control, and packoff. The overshot bowl is turned with a taper on a helical spiral internally and then the grapple, which is turned with an identical spiral and taper, is fitted to it. Overshots are very versatile and may be fitted for a variety of problems. Mill controls may be used to dress the area that the grapple will catch in order to remove burrs and splinters on the pipe. When the pipe has been "shot off" or parted in such a way to heavily damage it, it may be necessary to fit a mill extension, or mill guide, to the overshot bowl so that extensive milling can be accomplished for the catch to be made on the same trip in the hole. These extensions, or guides, are "dressed" inside with tungsten carbide and can mill off a substantial amount of material so that the "fish" is trimmed down to the grapple size. Controls may also be designed with a pack-off, or packer, that seals off around the fish and allows the circulating fluid to be pumped through the fish to aid in freeing the stuck fish. To properly engage an overshot on a fish, slowly rotate the overshot as it is lowered onto the fish. The pump may be engaged to help clean the fish and also to indicate when the overshot goes over the object. Once this has been indicated by an increase in pump pressure, stop the pump, as there may be a tendency to kick the overshot off the fish. Set the grapple with gradually increasing light upward blows. An excessively hard upward impact may strip the grapple off the fish and cause the wickers to be dulled, resulting in a miss run and trip to replace the grapple. To release overshots, it is first necessary to free the two tapered surfaces, bowl, and grapple, from each other. This freeing of 8-20 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 8. WELL REPAIR the grapple or "shucking" can be accomplished by jarring down with the fishing string. Usually a bumper sub is run just above the overshot and is used for this purpose. After bumping down on the overshot the grapple is usually free and the overshot can be rotated to the right and released from the fish. If a large amount of the fish has been swallowed, it may be necessary to free or "shuck" the grapple more than once. Figure 8-14 Overshots with Bowl and Spiral Grapples Bowen Series 150 Circulating and Releasing Overshot (long neck) is the strongest tool available to externally engage, pack off and pull a fish. It can be used with jarring assemblies, in back-off operations, in retrieving parted pipe, drill collars or GP filters with long fish neck (Figure 8-15a). Bowen Series 70 Short Catch Overshots (short neck) is used in cases when the fish neck is short (Figure 8-15b). Bowen Series 20 Sucker Rod Fishing Overshot are short-catch sucker rod overshots witch provide means for engaging the exposed portion of a fish too short to be engaged with conventional catch overshot (Figure 8-15c). http://www.petrom.com 8-21 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 8. WELL REPAIR a b c Figure 8-15 a) Bowen Series 150 Circulating and Releasing Overshot (long neck); b) Bowen Series 70 Short Catch Overshots (short neck); c) Bowen Series 20 Sucker Rod Fishing Overshot 8.4.3 Die Collars Rotary Die Collars are the most economical external catch tools for freeing stuck fish. The hollow tapered, hardened teeth provide excellent engagement. Die Collars are available with plain or lipped bottom or threaded bottom for attaching a lipped guide. The principal advantage of a die collar is that it is inexpensive and that it requires virtually no maintenance. The disadvantage of a Die Collar lies in the fact that it cannot be disengaged from the fish in the event that it proves impossible to pull the fish. Furthermore, it is difficult to gauge the amount of torque required for its operation. Insufficient torque results in an insecure hold; too much torque can result in distortion of the fish and damage the tool to such an extent that engagement is lost. The basic operating procedure for using a die collar is: tag the fish and pick up approximately 2 feet (half meter). Rotate slowly while lowering the pipe; rotate to the LEFT for left-hand taper tap or die collar; rotate to the RIGHT for right-hand taper tap or die collar. When rotary torque indicates that fish has been engaged, release the torque slowly. Do not allow the pipe to spin freely or fishing tool may back off and disengage from fish. Proceed with recovery operations. Die Collars are used to externally engage and retrieve a tubular fish. Particularly useful in back-off operations where permitting the passage of wireline tools. There are two basic types of die collars: Type-A with plain (Figure 8-16a) end and Type-B with threaded end (Figure 8-16b). Entrance port of both types of die collars can be configured in several ways, like: plain type, with standard or oversized lip or with teeth; just as it is shown here bellow (Figure 8-16c). 8-22 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 8. WELL REPAIR a b c Figure 8-16 a) Type A Die Collar; b)Type B die Collar With Lipped Guide; c)Entrance port of both types of die collars 8.4.4 Releasing Spear The Releasing Spear (Figure 8-17a) is used to internally engage and to retrieve all sizes of tubing, drill pipe, and casing as opposed to overshots which catch on the outside. It is designed to assure positive internal engagement with the fish and is ruggedly built to withstand severe jarring and pulling strains without distorting the fish. Usually a spear is not the first choice, as the spear will have a smaller internal bore than an overshot which limits running of some tools and instruments through it for cutting, free-pointing, and in some cases, backing-off. Spears, however, are popular for use in pulling liners, picking up parted or stuck casing, or fishing any pipe that has become enlarged when parted due to explosive shots, fatigue, or splintering. The most popular spears in use today are built on the same principles as overshots with a tapered helix on the mandrel and a matching surface on the inside of the grapple. The slip or gripping surface is on the outside surface of the spear so that it will catch and grip the inside of the pipe that is being fished. Due to the design with the small bore in the mandrel, spears are usually very strong. The spear is run inside the fish and positioned. The slips are released by action of the J-slot by using left-hand torque, moving the drill string down a short distance, and then picking it back up slowly. This action releases the slips so they can slide up over a taper on the body of the spear, as the spear is moved uphole. The slips move outward engaging the inner wall of the fish. In order to release a spear, it is rotated to the right. If the grapple is frozen to the mandrel, it may be necessary to bump down to free or 'shuck' the grapple. Usually a bumper sub is run just above the spear and this can be used to effectively jar down and free the grapple. The spear is a very versatile tool, in that it can be run in the string above an internal cutting tool if desired or in combination with other tools. Milling tools may be run below the spear to open up the pipe so that the spear can enter and catch the fish. http://www.petrom.com 8-23 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 8. WELL REPAIR Spears are available in wide variety of sizes and configurations from 1.660” up to 9-5/8”. Bowen L&L Releasing Spear (Figure 8-17b) is used to internally engage and retrieve all sizes drill pipe, casing and tubing. It is further used In back-off operations, in setting liners and in holding casing strings while a nipple for permanent landing is being cut. Bowen Full Circle Releasing Spear is used to internally engage and retrieve drill pipe, casing and tubing, provides a large contact area between fish and slip segments and can be used with jarring assemblies. a b Figure 8-17 a) Bowen releasing spear; b) Bowen L-L Releasing Spear Packer Retriever Tools are internal engaging fishing tools designed to retrieve all types of “drillable” production packers in a single run. They are used in an assembly which consists of a retriever, stinger, mill shoe and bushing. On request packer manufacturers or fishing tool manufacturers will provide the necessary tool for each type of packer to be retrieved. 8.4.5 Taper Tap The Taper Tap is used to engage a tubular fish internally. This tool screws into the fish and cuts threads as it goes. Cutting new threads is a more positive engagement than attempting simply to screw on or into existing threads on a fish that may be damaged, misaligned or incomplete. New threads can also be cut on blank pipe. Frequently, the Taper Tap is used to retrieve a production packer after the slip segments and packer elements have been milled with conventional mills. 8-24 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 8. WELL REPAIR Taper Tap is used to internally engage and retrieve a tubular fish which is restrained from rotation. It is particularly useful in its left hand version where it is used in back-off operations. Rotary Taper Tap with removable Skirt and Guide Kick Taper Tap. a b Figure 8-18 a) Bowen Simplex Packer Retriever; b) Taper Tap, with Guide, ’Kick-Off’ type 8.4.6 Drill Pipe Safety Joint The Safety Joint is a two-piece special connection that can be located at any desired point in a string of pipe. It will withstand all of the normal operation of the string, transmit full torque in either direction or, at the will of the operator, it can be easily released to salvage all of that portions of the string above it. Made up at any desired point in a drilling, fishing, testing, wash-over or tubing string, the Safety Joint operates as a unit unaffected by vibration, inertia of the bit or drill collars, or while rotating out of the well. No movement can occur between the two sections of the Safety joint nor can it be released without a specific mechanical procedure. When the need arises, it is simple to release and to reengage. A Safety joint is used in a drilling, fishing, testing, wash-over or tubing string http://www.petrom.com 8-25 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 8. WELL REPAIR whenever and wherever a releasing safety connection is considered to be desirable. In Drilling Strings, the Safety Joint is usually located far enough above the drill collars to prevent compression loading and to avoid sticky or heaving formation. Drill pipe Safety Joints have drill pipe box and pin connections with the O.D. and I.D. corresponding to the drill pipe tool joints. The Safety Joint consists of an upper Pin Section, a lower Box Section and two Packers. The upper Pin Section has a box connection up for connecting to the tool joint and abroad helical male thread down for connection to the Box Section. The Box Section has a broad helical female thread matching the male thread of the Pin Section and has a tool joint pin connection down for connecting to the pipe. The broad helical matching threads of the Pin and Box Sections allow speed and ease of engagement since they are relatively free of contact as the two sections are made up. However when the Safety Joint is made up tightly, the reversely pitched surfaces of the joining shoulders grip each other securely, pulling the mating helical surfaces into complete contact and therefore form the Safety Joint into a rigid unit. The Pin Section is grooved at the top and bottom to accommodate the “O” ring type Top and Bottom Packers which seal the Safety joint from both internal and external fluid pressures. Both Packers are rated for high pressure operation, capable of withstanding in excess of 10,000 psi in continuous service. The Coarse Thread Safety Joint is used in drilling, work over, fishing, testing, washover or tubing string whenever and wherever a releasing safety connection is needed. In drilling string the safety joint is usually located far enough above the drill collars to prevent compression and to avoid sticky or heaving formations. Connections and OD/ID of the safety joints are in line with the DP tool joints. In fishing string the safety joint is usually located immediately above the grappling of fishing tool, and bellow any accessories as jars, accelerators or bumper subs. In wash over string the safety joint is usually located between the drill pipe (work string) and wash over string. The connection of the safety joint on top is box (for drill pipe or work string) and pin bottom (for the wash over string). Diameters conform to the wash over pipe/string. The safety joint in the tubing string is usually located immediately above the tubing catcher or production packer. Tubing safety joints have tubing box and pin connections with OD corresponding to the tubing couplings and ID corresponding to the tubing ID. 8.4.7 Washover Safety Joint The washover safety joint is used in connecting drill pipe to your washover string. It provides a dependable means of releasing the drill pipe from the washover pipe if the washover string becomes stuck. The lower half of the washover safety joint remains with the washpipe when parted and is full bore to match the washpipe, making subsequent re-entry of other tools possible. A coarse pitch safety thread, in combination with the friction ring, assures proper release when required. Washover safety joints are made from heat -treated alloy steel and are stronger than the pipe that they are designed to run on. The safety joint should be made up properly in the string. This is done by making up the lower half into the washpipe. Make up the top half into the lower half with the same torque as 8-26 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 8. WELL REPAIR applied to the washpipe connections. To release the safety joint, bump down sharply on the safety joint with drill string while holding a safe, left hand torque. Raise the string slowly while maintaining torque. The upper half will unscrew from the lower half, and the friction ring will remain with the retrieved upper half. To re-engage the joint, carefully feel for contact with the lower half, then apply a small amount of weight. Make one revolution to the left, then turn slowly to the right, while maintaining the small amount of weight. An increase in torque will signify that the joint has made up. Baash-Ross Safety Joint is particularly well suited to washover operations. The fingers transmit the torque. By reverse rotation a limited amount of torque can be transmitted through the tilted fingers before the connection breaks. a b Figure 8-19 a) Bowen Coarse Thread Safety Joint; b) Washover Safety Joint 8.4.8 Fishing Bumper Sub To make up a proper fishing string, it is very important that a Bumper Sub (Figure 8-20a) be included as one of the components. There are numerous other applications where a Bumper Sub is a required item, such as when drilling in sticking or heaving formations. In these cases the ability to deliver downward blows is necessary to keep the string from sticking. To make up a proper fishing string, it is very important that a Bumper Sub be included as one of the components. There are numerous other applications where a Bumper Sub is a required item, such as when drilling in sticking or heaving formations. In these cases the ability to deliver downward blows is necessary to keep the string from sticking. The Fishing Bumper Sub is an inexpensive device designed primarily for use in a fishing string. Under normal conditions, its use is not prolonged over a considerable period of time. Fishing Bumper Subs are installed on fishing strings immediately above http://www.petrom.com 8-27 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 8. WELL REPAIR the fishing tool or safety joint. Its presence in the string assures the operator of the ability to release the fishing tool in the event it becomes impossible to pull the fish. This device will deliver the sharp downward blow and transmit the torque that is required to break the fishing tool’s engagement and releases it from the fish. Whenever a releasing type fishing tool is to be used, a properly made up Bowen lubricated fishing bumper sub should be included in the fishing string. It is generally inserted in the fishing string immediately above the fishing tool safety joint or unlatching joint. It ensures that the operator has the means available to release the fishing tool if and when it becomes impossible to pull the fish. The Bowen lubricated fishing bumper sub will deliver the sharp downward blow and transmit the torque required to break the fishing tool engagement to release it from the fish. Likewise, the Bowen lubricated fishing bumper sub can be used to great advantage to release a fishing tool from a recovered fish at the top of the hole, once recovered. It simplifies the operation and eliminates the necessity to resort to awkward measures such as dropping the elevators or bumping down with the hook. a b Figure 8-20 a) Fishing Bumper Subs; b) Hydraulic Fishing Jar 8-28 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 8. WELL REPAIR 8.4.9 Hydraulic Fishing Jars Jars are impact tools used to strike heavy blows either up or down upon a fish that is stuck. Jars fall into two categories as to use: drilling jars and fishing jars. Jars can further be classified as to the basic principle of operation; either hydraulic (Figure 8-20b) or mechanical. Most jarring strings used in conjunction with fishing operations consist of hydraulic "Oil" jars. Oil jars are very effective in freeing stuck fish as the energy stored in the stretched drill pipe or tubing is converted to an impact force, which can be varied according to the pull exerted on the string. The oil jar is designed to strike a blow upward only, while an additional tool; the bumper sub is designed to strike a blow downward on the fish. The oil jar consists of a mandrel and piston operating within a hydraulic cylinder. When the oil jar is in the closed position, the piston is in the down position in the cylinder where it provides a very tight fit and restricts the movement of the piston within the cylinder. The piston is fitted with a set of packing which slows the passage of oil from the upper chamber to the lower chamber of the cylinder when the mandrel is pulled by picking up on the work string at surface. About half way through the stroke, the piston reaches an enlarged section of the cylinder and is no longer restricted so the piston moves up very quickly and strikes the mandrel body. The intensity of this impact can be varied by the amount of strain taken on the work string. This variable impact is the main advantage of the oil jar over the mechanical jar for fishing. 8.4.10Jar Intensifier The Jar Intensifier (Figure 8-21a) is perhaps one of the most outstanding devices designed to aid in the successful completion of difficult fishing jobs. The tool is designed to become a component part of a fishing string and to work in conjunction with a Hydraulic Jar to positively insure that the jarring blows are concentrated at the stuck point. The restraining mechanism in a hydraulic jar (an expansion joint with a limited longitudinal stroke) permits the buildup of extreme energy in the drill pipe and the ability to suddenly release the energy to drive a mass of weight upwardly to strike a heavy jarring blow. The mass of weight is composed of those drill collars which are installed above the Jar. The energy which has been built up in the stretched drill pipe is often partially dissipated by hole friction, crooked holes, etc. If the tremendous energy stored in the drill pipe can be concentrated at a point close to where the fish is stuck and released in a forceful manner at that point, the net result of the jarring effort is greatly increased. Therefore, the Jar Intensifier is installed immediately above the drill collars. The design of an effective tool of this type is possible because of the development of a good compressible fluid and the unique and extremely effective Seal Ring Assembly similar to that used in the hydraulic rotary jar. The Intensifier is essential in shallow holes when there is insufficient pipe to achieve the necessary stretch to strike a blow. Jar accelerator is used in conjunction with a jar to provide additional strain in the jarring string. Cushioning effect is when the string rebounds following the impact. This reduces the shock loads on drill string as well as rig. jar accelerator transmits full torque in either direction. Bumper sub telescoping slack joint enables to strike blows up as well down used in a drilling or fishing string. http://www.petrom.com 8-29 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 8. WELL REPAIR 8.4.11Surface Jars Jars are tools designed to deliver frequent and hammer-like blows to drive a fish toward the surface. The Surface Jar (Figure 8-21b) is designed to deliver a heavy downward blow against a stuck fish. The tool performs outstanding service in areas where key seating is a problem. It is virtually impossible to pull large diameter drill collars up through key seats; therefore, the solution lies in being able to drive them back down into the open-hole. The tool is unusual in that to strike downward blows, the operator actually pulls upward against the tool. The surface jars, in fact, reverses the direction of force that is obtained from a Rotary Jar used in a down hole jarring operation. A point of difference between the surface jar and a conventional rotary jar lies in the fact that the surface jar has a long 48” stroke. In a jarring operation, when the tool trips, the energy that has been built up and stored in the drill pipe creates a force that travels away from the point of release. Since a Surface Jar is installed at the surface, the drill pipe below is stretched and when the Jar trips, the stretched drill pipe will move rapidly to regain its original length. Because the stretched drill pipe is below the Jar, the force will travel in a downward direction, resulting in the weight of the drill pipe being hammered downward against the stuck fish. In this reverse action, it is not necessary that two striking surfaces meet and ordinarily this would never occur unless there was a very great length of pipe between the surface and the stuck point. The purpose of the 48” stroke in a surface jar is to permit the drill string to fall heavily against the stuck point. The short stroke in a conventional rotary jar makes it ineffective in a surface jar application. The tripping tonnage of the surface jar is adjustable, but it should be set so that the pull necessary to trip it does not exceed the weight of the drill pipe between the surface and the stuck point. This is necessary to avoid pulling a stuck drill collar further into a key seat. Repeating the jarring operations several times normally knocks the drill collars out of the key seat. Also, a single blow usually is ample to cause the release of a fishing tool when the surface jar is used to provide the downward blow required to cause effective disengagement from the fish. When used in fishing operations the Bowen super fishing jar should be installed immediately below the drill collars string. For maximum effectiveness of jarring, a Bowen jar intensifier should be installed about four drill collars above the jar. 8.4.12Wireline Spears One of the most challenging of fishing operations may be the recovery of wireline (means here slick line or wire) and the tools or instruments run with it. It happens often that wireline has been parted due to over pull, corrosion, wear or other reasons. When it occurs, wireline slumps down the hole in a coil. The wireline centre spear, the two-pronged wire grab or the crank shaft spear (Figure 8-22) are used frequently to remove parted wireline from the wellbore. When the tools are used in casing, a guide should be run above the tool to prevent the wire from getting above the spear from a fish. Rope or Electric (Wireline) Cable Spear is used to retrieve a broken rope or cable from a well bore. It may have different shape & types of barbs, collapsible barbs or serrated barbs. 8-30 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 8. WELL REPAIR a b Figure 8-21a) Bowen Jar Intensifier; b) Bowen Surface Bumper Jar http://www.petrom.com 8-31 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 8. WELL REPAIR 8.4.13Free Point Instrument and Pipe Back-off The most common method of parting a downhole assembly is backing it off. The procedure includes the following steps: 1) Running a free-point indicator to determine the free point. 2) Placing left hand torque in the drill pipe downhole assembly and working it down to the point to be baked off. 3) Running a string shot (small amount of explosive) across the depth to be backed off and detonating. 4) Rotating the pipe until it is backed off and pulled out of hole. H-E Reversing Tool is used in cased wells to back off stuck pipe with right hand connections while still employing a right hand running string. It eliminates thus the need for a complete string of left hand pipe. It’s major application is found in workover operations It is also used for retrieving stuck drill strings. a b Figure 8-22a) Different Wireline Spear Types; b) Reverse Rotation Back-off Tool 8-32 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 8. WELL REPAIR 8.5 Cutters 8.5.1 Jet Cut A cut made by an explosive shaped with a concave face and formed in a circle. It is also run and fired on an electric line. 8.5.2 Chemical Cut Chemical Cutter is an electric wireline tool which uses a propellant and a chemical - Halogen Fluoride - to burn a series of holes in the pipe thereby weakening it so that it easily pulls apart with a slight pull. This method of cutting pipe is the most recent innovation. It was patented and for years was an exclusive process of one wireline company. Today it is available through most electric wireline service companies for practically all sizes of tubing and drill pipe and most popular sizes of casing. All wireline chemical cuts are generally economical because rig time is reduced to a minimum. The big advantage of the chemical cut is that there is no flare, burr, or swelling of the pipe that is cut. Therefore, no dressing of the cut is necessary in order to catch it on the outside with an overshot or on the inside with a spear. The chemical cutting tool consists of a body having a series of chemical flow jets spaced around the lower part of the tool. The tool contains a propellant which forces the chemical reactant through the jets under high pressure and at high temperature to react with the metal of the pipe. Electric current ignites the propellant which forces the chemical, Halogen Fluoride or Bromide Tri-Fluoride, through the reaction section which heats the chemical and forces it out the jets. The tool also contains pressure-actuated slips to prevent a vertical movement of the tool up the hole and insure a successful cut. The chemical cutting tool may also be explained as producing a series of perforations around the periphery of the pipe. The reaction of the chemical produces harmless salts which do not damage adjacent casing. The products of the chemical reaction are harmless and are rapidly dissipated in the well fluid. The chemical cutter will not operate successfully in dry pipe and requires at least one hundred feet of fluid above the tool when a cut is made. Since it is not necessary to apply torque to the pipe when chemically cutting as compared with the string shot back-off, it is a safer process for rig personnel. 8.5.3 Mechanical Cut The K-Mill is a hydraulically actuated tool used to mill a section in casing or tubing. The K-Mill is a simple design, easy to operate, and has an outstanding reputation for milling performance. The milling knives are dressed with tungsten carbide. The mill is effective for milling casing, which is poorly cemented, split or corroded. Upon circulation through the tool, a pressure drop is created across the piston. This forces the cam down and expands the cutter knives into contact with the casing. Cut-out knives part the casing then all the knives participate in milling. When circulation is stopped, the piston spring will lift the piston, making the cam withdraw from between the knives. The knives are now free to collapse back into the body and the tool can be retrieved. The tool’s cutting action is very effective with 100’ sections possible with one set of knives. http://www.petrom.com 8-33 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 8. WELL REPAIR Figure 8-23 Mechanical Cut Internal Casing Cutter Stuck casing can be cut internally with a casing cutter for sizes 1-1/2” up to 20-3/4”. They may be run on macaroni strings, tubing or drill pipe. The internal cutter consists of: - Wiper block or drag spring assembly to accomplish setting the tool in the pipe that is to be cut. - Slips and cone assembly to anchor the tool. Main spring to assist in maintaining uniform feed to the knives. Wedge-like knife blocks to drive the knives upward and outward into contact with the pipe. Hardened and ground knives for easy and efficient cutting. An outstanding feature of the internal cutter is the automatic bottom. This feature permits the operator to set the cutter at any desired depth, without coming out of the hole. When the cutter reaches a point were a cut is to be made, lowering and rotation to the right unscrews the mandrel from the grip jaw while friction is maintained by the wiper blocks against the inside of the pipe. With a wedging action, the cone expands the slips to engage the knife blocks then force the knives outward, continuing until the cut has been completed. When the string is raised, the slips are disengaged, the knives retract, and the cutter returns automatically to its run-in position. External Pipe Cutter The hydraulic external cutters (Figure 8-25a, b) are hydraulically actuated mechanical tubing and drill pipe cutters. The cutters are fast, smooth and efficient tools. The cutter knives are fed entirely by pump pressure, thus giving the operator sensitive control. 8-34 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 8. WELL REPAIR To operate, assemble the cutter using the proper size and type of piston assembly. Run the cutter into the hole to cutting depth. When cutting depth is reached, open the fill-up and standpipe valves just enough to shear the shear pins. Begin slow rotation, 15 to 25 RPM. Slowly close the bypass valve again to pump fluid down the working string. This will begin feeding the knives to start the cut. The amount of pressure and gallons per minute required depends on the size cutter and piston assembly being used. Use extreme caution to avoid surging or pump pressure when starting a cut. Pressure surging causes the string length to contract and expand, moving the cutter up and down. This motion prevents the knives from remaining in one position when starting a cut. A rough chattering action followed by the smoothing of the rotary will signal the completion of the cut. a b Figure 8-24 a) Internal Casing Cutters; b) internal Pipe Cutter Keyseat Wiper or Reamer One of the major causes of fishing is keyseating. A keyseat is a section of hole where a smaller hole is cut into the wall of the well bore by the movement of the downhole drilling assembly. It usually occurs where the hole changes direction. A section of the downhole drilling assembly can get wedged into the keyseat. Keyseats almost always can be detected in time to take preventive action http://www.petrom.com 8-35 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 8. WELL REPAIR before the pipe sticks. Proper prevention means observing the signs that a keyseat is developing and immediately eliminate it. The keyseat wiper or reamer (Figure 8-25c), which consists of a mandrel and sleeve with spiralling tungsten carbide strips, is located in the string immediately above the drill collars. The sleeve is slightly larger in diameter than the drill collars. After locating the keyseat, the wiper or reamer is raised to engage it. The tool is then rotated causing the tungsten carbide strips to cut clearance for the drill collars. During drilling operations, the sleeve remains engaged with the positive clutch and rotates with the drill pipe. Should the sleeve become stuck and impossible to rotate, an overriding clutch at the upper end will produce a downward blow to assist in dislodging the sleeve. a b c Figure 8-25 c) Bowen Hydraulic External Cutters; b) External Pipe cutter; c) Keyet Wiper (Reamer) 8-36 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 8. WELL REPAIR 8.6 Fishing Tools Configuration For the configuration of different BHA’s in fishing and milling operations pls look the following schematics: • BHA for milling operation, • BHA for washover operation, • BHA for releasing spear operation, • BHA with mechanical jar, • BHA with hydraulic jar, • BHA with hydraulic jar and accelerator, and • BHA with reversing tool. Figure 8-26 BHA for Milling and Washover Operations Figure 8-27 BHA for Releasing Spear Operation and BHA with Mechanical Jar http://www.petrom.com 8-37 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 8. WELL REPAIR Figure 8-28 BHA with Hydraulic Jar and BOH with Hydraulic jar & Accelerator Figure 8-29 BHA with Reversing Tool; Fishing Magnet 8-38 http://www.petrom.com 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 8. WELL REPAIR 8.7 Fishing Technology Workflow Figure 8-30 Fishing Operation Technology flow Diagram http://www.petrom.com 8-39 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 8. WELL REPAIR 8.8 Casing Patches Introduction A casing patch is a thin walled steel liner, which tightly conforms against the inside of the casing, with the intent of permanently sealing off any type of leak. The standard patch restricts the I.D. of the casing by 0.3 inches (8mm). A heavier patch is also available in casing sizes 7” (177.8mm) and larger with a 0.480 in (12mm) I.D. restriction. The standard patch arrives on location in a corrugated form (the cross section is star shaped) with fiberglass cloth on the outside. The fiberglass cloth, along with the epoxy, acts as a gasket when set. Once in position, pulling a specially designed expander tool through it expands the patch. Once expanded, or formed against the casing I.D., it is permanently held in place by radial compression. The following are examples of where a casing patch could be used to remedy a given casing integrity problem: Figure 8-31 Installing a Casing Patch Collar Leaks A casing patch can seal off a collar leak. No other special preparation is required other than a scraper and drift run prior to running of the patch. Perforations Undesired perforations can be sealed off by using an internal steel casing patch. The size of the perforations will determine the pressure rating of the patch. Corrosion and erosion of the perforations will increase their size and reduce the internal and external pressure rating of the patch. Patches can be milled out or perforated to re-open a zone. Split Casing When patching split casing it is recommended that the patch is of sufficient length to cover the split plus 6-8 feet (1.8-2.5m) over lap on each end. This is because the split will have the tendency to spread or grow over time or while setting the patch. If the split was caused by excessive pressure, it is important to consider future pressure requirements of the patch. 8-40 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 8. WELL REPAIR Corrosion Both ends of the patch must be set in good non-corroded pipe when patching corroded casing. Therefore when dealing with long corroded zones (in excess of 60 ft.(18 m)), an extended length patch might be required. The extended length patch will come in two or more pieces that will require welding on the rig floor while running. Patches as long as 200 ft (60 m) have been run utilizing this method. When welding the patch sections together at the rig floor, the well is open to the atmosphere. If there is any chance of well control problems, extended length patches are not recommended. If corrosion of the patch is of concern, then a corrosion resistant patch material, Incoloy 825, can be used. Typically these patches require more force or hydraulic pressure to be set. Milled Windows or Wear in Doglegs Milled windows or wear holes in doglegs are often quite large and their size and shape are difficult to determine. A milled window might have a rolled-in edge at the bottom. If this edge is large enough it could interfere with the setting of the patch, possible resulting in it becoming stuck in the hole, with the patch being partially set. Therefore it is extremely important to make an API drift run prior to running the patch. If the drift won’t pass, a tapered mill or string mill should be run to remove the restriction. Afterwards re-run the drift to insure the restriction is gone. Doglegs pose similar problems, severe doglegs may not allow the passing of the rigid unset patch to pass. It is strongly recommended that a trip be made with flush joint wash pipe or drill collars longer than the patch assembly and with an O.D. larger than the unset patch to assure the patch and setting equipment will pass through the dogleg. Figure 8-32 Elements of Casing and Patch System http://www.petrom.com 8-41 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 8. WELL REPAIR A casing scraper run is normally recommended before setting a patch to clean the area. However if the window or dogleg wear is very large there may be some concern about sticking the scraper. Not making a scraper run has its own risks as well. Foreign material on the casing wall could prevent setting the full length of patch resulting in a fishing job. Therefore it is a good idea to run the drift or mill as described above. Casing Patch Specification Currently there are in use casing patches for different casing sizes. Man supplier for casing patches for OMV Petrom in this moment is Weatherford; but several other service providers are offering their equipment & services. 8.8.1 Hole Preparation for Casing Patching Locating and Identifying the Leak A wide variety of methods and equipment can be used to locate leaks, such as bridge plug and packer, RTTS (Re-settable Test & Treat System) tool, wireline logs, MFC (Multi-Finger Calliper) logs or Downhole Video cameras. Correlating or positioning the patch is very critical. If the position of the patch is off by several feet, a slow leak may result. To assure proper placement, a gamma ray log in conjunction with a radioactive sub or a pup joint in the string may be used for exact measurement determination. Casing Scraper Run A casing scraper run is normally recommended before setting a patch to ensure the area is clean. Pipe scale or other debris on the casing wall could prevent setting the full length of patch resulting in a fishing job. API Drift and/or Gauge Run As previously mentioned, it is extremely important to make an API drift or gauge run prior to running the patch into the well. If the pipe won’t drift, a tapered mill or string mill should be run to remove the restriction. In a deviated hole it is recommended to run a gauge run with flush pipe larger in diameter than the patch setting equipment and 25 ft (7.6 m) longer than the patch. This will assure the patch and setting equipment will pass through any of the doglegs without getting hung up and becoming stuck. Well Cleaning / Circulation Circulating clean completion fluid through the well until all the returns come back clean ensures that all the debris that the gauge ring, casing scraper or tapered mill might have dislodged is removed prior to running the patch. Sand can get in behind the patch preventing a good seal. Thus if any sand may enter above the casing patch depth, that sand source has to be eliminated/shut off. 8-42 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 8. WELL REPAIR 8.8.2 Running and Setting the Casing Patch The following is a brief summary of running and setting the patch. Different well conditions could necessitate the modifying of this procedure. For a more detailed procedure, see Operating Instructions by casing patch manufacturers and service providers. - The setting tool is assembled and the patch is sized to the casing. The expander assembly, extensions and casing patch are placed on the lower piston rod. After the steel liner is coated with epoxy resin, the tool is run in the hole on the work string. The liner is positioned across the leak. - The tubing is picked up to close the circulating valve. - If a hydraulic hold down is run, hydraulic pressure is applied to force out the buttons. This anchors the cylinder firmly and isolates the work string from all tensile loads caused by the setting operations. - Pressure on the underside of the piston pulls the expander assembly back up through the bottom of the corrugated patch. As pressure increases, the expander assembly is forced further into the patch, expanding it against the inside of the casing. Five feet of patch can be expanded in one stroke. The circulating valve is opened by lowering the work string, thereby telescoping the slide valve. The work string is raised again to pull up the cylinders in relation to the pistons held down by the expander assembly. The expanded section of the patch is held in place on the casing wall by friction caused by compressive hoop stresses. Hydraulic pressure is again applied to the work string after closing the circulating valve, once again expanding the hydraulic hold down buttons. - The expander assembly is again forced through the corrugated patch, expanding it against the inside of the casing. This procedure is continued until the entire patch is set. The epoxy resin is extruded into any leaks or cavities in the casing wall and acts as a gasket and additional setting agent. Setting time normally requires less than 30 minutes for a 20-ft. patch. The tool is then removed from the well. - It is recommended to allow the patch to be set for 24 hrs. prior to pressure testing the patch. The test pressure should not exceed the approximate internal pressure ratings given in the Specifications tables on the previous pages. http://www.petrom.com 8-43 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 8. WELL REPAIR Casing Patch Stuck in the Hole If the patch becomes stuck or the hydraulic setting equipment does not function, the patch can still be set mechanically or released from the safety sub. If after the first hydraulic stroke of the setting tool, it can no longer hold pressure, the patch can be completed with a straight pull by the rig. Therefore a good work string is required on which the patch is to be run. If the patch cannot be set with a straight pull by the rig, the tool can be released by applying upward strain and 8 to 10 rounds of right-hand torque, which releases a safety joint just above the expander assembly, allowing the retrieval of the tool. Removing a Set Casing Patch If it becomes necessary to remove a patch, it can be milled out with mills or rotary shoes. The O.D. of the mill or shoe should be between the drift diameter and 1/16-in. over drift if the patch is set or the drift diameter if stuck. NOTE: As mentioned before, the standard patch restricts the I.D. of the casing by 0.3 in (8 mm). A heavier patch is also available in casing sizes 7 in (177.8 mm) and larger with a 0.480 in (12 mm) I.D. restriction. Therefore, prior to running anything through a patch, ensure that the O.D. of the tool to be run is small enough to pass through the inner diameter of the patch. 8-44 Figure 8-33 Casing Patch Service Assembly http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 8. WELL REPAIR 8.9 Scab Liner The Scab Liner Packer (SLP) is an economical alternative to cement squeezing casing leaks or to isolate perforations. The system (Figure 8-34a) consists of an upper and lower packer with liner attached between them. Since the SLP uses packer-type sections it has proven to be much more durable than cup-type scab liners. The ID’s through the system are generally limited by the liner and frequently allow injection or production tubing to be run through the system and attached to existing tools below the SLP. The packers and liner are carried in the hole with tubing or drill pipe, 1/4 turn rotationally set and mechanically packed off with pipe weight. After setting, pack off forces are retained by body lock rings in both packers. The SLP does not remain connected to the tubing string and is not effected by production or injection tubing movement. Tubing can be pulled and re-run without disturbing the SLP. The SLP can be retrieved with the running tool if desired. 8.10 Liner Tie Back to Surface In the case when the production casing above the production liner is severely damaged and casing repair is not possible or not economic by cement squeeze, scab liners or casing patching, in those cases is necessary to tie a liner back into an existing liner and extend it to the surface. There are several liner tie-back products available on the market. A tie-back seal stem is fitted with molyglass seals and creates an effective seal with the liner-top PBR. Applications for tie-back seal stems include temporary tie-back liners (drilling tie-backs), scab liners, cemented tie-back liners, and tie-back packers that use top-set liner-top packers. Some seal stems feature cementing ports between two of the seal stacks so that the tieback string can be cemented in place. A tie-back packer (Figure 8-34b) features a seal stem, a packing element, holddown slips, and a linertop PBR. It is run as a second-trip packer when a liner that was run with a setting sleeve requires liner-top isolation. It is also run as a backup in case the original liner-top packer leaks. In most cases a tie-back packer is a reliable and cost-effective alternative to an expensive liner-top squeeze. 8.11 Cemented Tubing Completions In the case when casing repair is not possible with other methods due to lack of room inside the production casing (slim hole monobore completions for example) the ultimate solution for casing leak repair is cementing the production tubing (Figure 8-34c). The so called cemented completion concept is a fundamentally simple one. The well is prepared for completion; the production tubing string is ran and landed in the wellhead. Following it the completion tubing is cemented back inside the previous casing. The Christmas tree is then installed and the well perforated in the normal manner. Tubing can be cemented to the surface or just partially (in the bottom section). http://www.petrom.com 8-45 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 8. WELL REPAIR a b c Figure 8-34 a) Scab Liner Completion; b) Tie Back Packer; c) Cemented Tubing Completion 8-46 http://www.petrom.com 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 8. WELL REPAIR 8.12 Casing Repair Technology Workflow Figure 8-35 Casing Repair Flow Diagram http://www.petrom.com 8-47 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 8. WELL REPAIR List of Figures Figure 8-1a) Casing Swages; b) Casing Roller; c) Bowen Casing Scraper), Figure 8-2 Ditch Magnets, Figure 8-3a) Fishing Magnet; b) Junk Subs; c) Core Type Junk Basket, Figure 8-4 a) Reverse circulation junk basket; b) Reverse Circulating Junk Basket with Replaceable Junk Catchers (two), Figure 8-5 Junk mills with fishing neck, Figure 8-6 a) Flat bottom mills; b) Round nose, c) Taper mills), Figure 8-7 a) Watermelon mills; b) Piranha mill; c) Pilot mill; d) Bowen economill), Figure 8-9 a) Overshot milling shoes; b) Packer retrieving milling shoes; c)Junk basket milling shoes, Figure 8-10a)Type A rotary shoes; b) Type B rotary shoes; c)Type C rotary shoes; d)Type D rotary shoes, Figure 8-11 a) Type E rotary shoes; b) Type F rotary shoes; d) Type G rotary shoes; d) Type H rotary shoes), Figure 8-12 a) Type I rotary shoes; b) Type J rotary shoes; c) TypeK rotary shoes, Figure 8-13 Lead Impression Blocks with Different Indents, Figure 8-14 Overshots with Bowl and Spiral Grapples, Figure 8-15 a) Bowen Series 150 Circulating and Releasing Overshot (long neck); b) Bowen Series 70 Short Catch Overshots (short neck); c) Bowen Series 20 Sucker Rod Fishing Overshot, Figure 8-16 a) Type A Die Collar; b)Type B die Collar With Lipped Guide; c)Entrance port of both types of die collars, Figure 8-17 a) Bowen releasing spear; b) Bowen L-L Releasing Spear, Figure 8-18 a) Bowen Simplex Packer Retriever; b) Taper Tap, with Guide, ’Kick-Off’ type, Figure 8-19 a) Bowen Coarse Thread Safety Joint; b) Washover Safety Joint, Figure 8-20 a) Fishing Bumper Subs; b) Hydraulic Fishing Jar, Figure 8-21a) Bowen Jar Intensifier; b) Bowen Surface Bumper Jar, Figure 8-22a) Different Wireline Spear Types; b) Reverse Rotation Back-off Tool, Figure 8-23 Mechanical Cut, Figure 8-24 a) Internal Casing Cutters; b) internal Pipe Cutter, Figure 8-25 c) Bowen Hydraulic External Cutters; b) External Pipe cutter; c) Keyet Wiper (Reamer), 8-48 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 8. WELL REPAIR Figure 8-26 BHA for Milling and Washover Operations, Figure 8-27 BHA for Releasing Spear Operation and BHA with Mechanical Jar, Figure 8-28 BHA with Hydraulic Jar and BOH with Hydraulic jar & Accelerator, Figure 8-29 BHA with Reversing Tool; Fishing Magnet, Figure 8-30 Fishing Operation Technology flow Diagram, Figure 8-31 Installing a Casing Patch, Figure 8-32 Elements of Casing and Patch System, Figure 8-33 Casing Patch Service Assembly, Figure 8-34 a) Scab Liner Completion; b) Tie Back Packer; c) Cemented Tubing Completion, Figure 8-35 Casing Repair Flow Diagram. List of Tables Table 8-1 Application and running parameters for some mills. http://www.petrom.com 8-49 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 8. WELL REPAIR References 1. Well/Casing Repair WO Best practices in OMV Petrom/WO Program 346 Ciuresti S 2. Fishing General Presentation, NExT (Network of Excellence in Training) 3. Well Completion Best Practices Reports (programming, execution, HO, etc.) Wells: Mamu4316 and 4320; Petrom, RO 4. Technology and Technics for performing various WO operations (cementing, acidizing, milling, fishing etc.) by using CT; Weatherford, International 5. Cementing with Coil Tubing SOP; Weatherford, International 6. Composite Plug Milling Using CT; Weatherford, International 7. Tubing Cutter Procedure; Weatherford, International 8. HETS Internal Casing Patch; HETS 9. EniAgip Drilling And Workover Manual; ENI, International 10. WEATHERFORD Fishing Technical Manual; Weatherford, International 11. National Oilwell FISHING TOOLS; Varco, International 12. Saudi Aramco WorkOver Manual; Saudi Aramco, SA 13. NORSOK Well Intervention Standards; Norwegian North Sea sector, Norway 14. Workover Handbook; Petrom RO 15. MOBIL Completion Handbook; Exxon-Mobil, International 16. Petroleum Engineering Handbook 8-50 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 9. STIMULATION BY ACIDIZING 9. STIMULATION BY ACIDIZING Contents EXECUTIVE SUMMARY ......................................................................................................................... 9-1 9. STIMULATION BY ACIDIZING ............................................................................................................ 9-3 9.1 Introduction ............................................................................................................................. 9-3 9.1.1 Objectives of Well Stimulation by Acidizing ...................................................................... 9-4 9.2 Well Acidizing Stimulation Technology.................................................................................... 9-4 9.2.1 Total Skin factor and its use in OMV Petrom for Making Decision for Acidizing .............. 9-5 9.2.2 Best Candidate Selection Process for Acidizing ................................................................. 9-7 9.2.3 Review of the Most Frequent Damages in OMV Petrom and General Selection of Treatment .......................................................................................................................... 9-7 9.3 Well Acidizing Methods Applied in OMV Petrom .................................................................. 9-10 9.3.1 Sandstone ........................................................................................................................ 9-13 9.3.2 Carbonate ........................................................................................................................ 9-15 9.4 Technology Workflow of Best Practices for Fluid Selection, Treatment Design and Job Execution ............................................................................................................................... 9-18 9.4.1 Sandstone Matrix Acidizing Treatment ........................................................................... 9-18 9.4.2 Applied Sandstone Design Procedure ............................................................................. 9-29 9.4.3 Carbonate Acidizing Best Practices.................................................................................. 9-36 9.4.4 Planning and Job , Execution of Acidizing Treatment...................................................... 9-45 9.4.5 Job Evaluation and Control .............................................................................................. 9-48 9.5 Configuration of Surface Equipment for Acidizing............................................................... 9-52 9.6 Fluids and Materials Used for Acidizing ................................................................................. 9-53 9.6.1 Additives (corrosion inhibitors, Iron-Control Agents, Clay Stabilizers etc)...................... 9-53 9.7 Quality and Safety Requirements for Acidizing ..................................................................... 9-54 9.7.1 Quality Control................................................................................................................. 9-54 9.7.2 Health, Safety and Environmental Aspects of Acidizing .................................................. 9-57 9.7.3 Personnel (Training, Supervision) .................................................................................... 9-59 Appendix 9-A Commercially Available Acid Systems Specification Details.................................... 9-60 Appendix 9-B Commercially Available Additives and Solvent Specifications ................................ 9-66 List of Figures ................................................................................................................................. 9-70 List of Tables................................................................................................................................... 9-72 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING References ...................................................................................................................................... 9-74 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 9. STIMULATION BY ACIDIZING EXECUTIVE SUMMARY EXECUTIVE SUMMARY: 9. STIMULATION BY ACIDIZING No. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. Strongly Recommended Review the well logs, reservoir characteristics and previous workovers to identify shortlist candidates with damage to the wellbore, in the perforations and / or within the formations. Clarify the factors causing skin damage on shortlist candidates and determine which near wellbore flow restrictions can be removed by acid treatment. Involve careful consideration of fluid selection, the pumping schedule, acid placement techniques and on-site treatment monitoring. Use developed workflows (Figure 9-10 to Figure 9-16) for proper fluid selection required for sandstone acidizing. Mineral Composition > 100 mD 20-100 mD < 20 mD <10% Silt and < 10 % Clay >10% Silt and >10 % Clay >10% Silt and < 10 % Clay >10% Silt and > 10 % Clay 15% HCl 10% HCl 7.5% HCl 10% HCl 7.5% HCl 5% HCl Reduce the concentration of the HCl if the formation is partially or totally dolomite and should be lowered wherever silicate content of the dolomite is high in order to avoid precipitation. Follow selection workflow in Figure 9-20. In case of high bottomhole temperatures use slower reacting weak organic acids. Special attention should be paid to the concentrations of formic acid to avoid precipitation of calcium formate. Use retarded HCl (by gelling or emulsifying the acid), or organic acids if bottomhole temperature is high (>120 oC). The cleanliness of all tanks that will hold water or acid should be verified and the acid tank must be circulated before pumping. Mix chemicals in recommended sequences. Always keep foam quality above 70%. Carry out acid pickling of tubing string for all important (costly) jobs. Put the well into production immediately (no reaction break) in high temperature wells. Use nitrogen displacement for gas wells. Use diverting for long (> 25 m) perforated intervals. Use HBF4 when problems with migrating fines exist, what is often case in the maturated wells completed with gravel pack. Verify availability and specifications of all fluids (additives, acid, surfactants, diverters) required to complete the stimulation job The injection rate and pressure is to be monitored and the pressure kept below predefined levels (especially breakdown pressure in sandstone). Fluids pumped during the stimulation job are to be sampled and analysed for posttreatment review. Real-time formation response to stimulation fluids should be recorded in a Field-AcidResponse-Curve (FARC) to enable swift corrective action to be undertaken during the treatment job. Use standardized treatment report which describes fluid QC data, pump rates, tubing and annular pressure measurements, types and volumes of fluids and diverters, deviations from the program, pumping interruptions and any other problems which influenced the execution of the treatment job. http://www.petrom.com 9-1 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING EXECUTIVE SUMMARY: 9. STIMULATION BY ACIDIZING No. Not Recommended at All 1. To exceed frac pressure during treatment operation. 2. To use HF + KCl or formation brine. 3. 4. If doing foam injection frac pressure is reached do not decrease foam quality, just stop nitrogen. To start treatment if all fluids which are pre-blended at the service company facility are not subjected to quality checks. 5. To use diverting for short (< 25 m) perforated intervals. 6. To use mud acid to treat formations if HCL solubility is > 20%. 7. To start acidizing treatment if sufficient injectivity is not obtained. 8. To use of HCl preflush after dry tests in exploratory/wildcat wells. 9. 10. 11. 9-2 To continue the treatment if the surface pressure rises sharply or rises continuously for certain volume of acid (0.5-1m3). To delay the well shut-in time after acidizing treatment in order to minimize precipitation of reaction product. To use NaCl, KCl, or CaCl2 brines in any HF treatment stages or in any stage immediately preceding or following HF stages. http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 9. STIMULATION BY ACIDIZING 9. STIMULATION BY ACIDIZING 9.1 Introduction There are two basic stimulation methods which can be used to eliminate formation damage and increase well productivity: matrix acidizing and fracturing (hydraulic and acid). Matrix stimulation by acidizing is injecting an acid/solvent at below the fracturing pressure of the formation in order to dissolve/disperse materials that impair well production in sandstone reservoirs or to create new unimpaired flow channels in carbonate reservoirs. In the case of injecting acid below the fracturing pressure the injected acid dissolve some of minerals present, and hence, reestablish or increase the permeability inner-wellbore vicinity (not deeper than 0.1 to 0.3m in sandstone reservoir and 1 to 3 m in carbonate reservoirs). Matrix acidizing can significantly enhance the productivity of a well when near-wellbore formation damage is present, and conversely, is of little benefit in an undamaged well. Thus, matrix acidizing should generally be applied only when a well has a high skin effect that cannot be attributed to partial penetration, perforation efficiency, or other mechanical aspects of the completion. The most common acids used in OMV Petrom are hydrochloric acid (HCl), used primarily to dissolve carbonate minerals, and mixtures of hydrochloric and hydrofluoric acids (HF/HCl), for attacking silicate minerals such as clays and feldspars. Other acid formulations, particularly some weak organic acids, are used in special applications. Acid fracturing, resulting from the injection of fluids at pressures above the formation fracture/parting pressure, is intended to create a path of high conductivity by dissolving the walls of the created fracture in a non-uniform way. Acid fracturing is sometimes used to overcome formation damage in relatively high-permeability formations. However, carbonate reservoirs of relatively low permeability may also be candidates for acid fracturing. In acid fracturing, the reservoir is hydraulically fractured and then the fracture faces are etched with acid to provide linear flow channels to the wellbore. Acid fracturing of relatively homogenous carbonates will produce smooth fracture faces that will retain little fracture flow capacity when treating pressure is released. Acid fracturing of heterogeneous carbonates can develop non-uniform etching of the fracture face. The area that is not etched acts as a support for the etched areas, thus providing flow channels in the fracture and significant increases in well productivity. It is suggested that laboratory tests be conducted on cores to determine the etching characteristics of the rock before treating a well. In some instances, the non-etched area of a heterogeneous carbonate will be softened by acid and will not support the fracture when treating pressure is released. The only alternative would be hydraulic fracturing and propping with sand. Two other problems can exist in acid fracturing: (1) Un-dissolved fines can significantly reduce fracture flow capacity if not removed with spent acid and suspending agents, usually surfactants or polymers will materially aid in the removal of these fines (2) Emulsions can block the etched fracture. API RP 42 tests should be performed to select an emulsion preventing surfactant for the acid treatment. http://www.petrom.com 9-3 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 9. STIMULATION BY ACIDIZING Acid fracturing is rarely used in the treatment of sandstones, because acid, even hydrofluoric acid (HF), does not adequately etch these fracture faces. However, treatments have been successful in some sandstone formations containing carbonate-filled natural fractures. Removal of these carbonate deposits often results in sufficient conductivity to yield excellent treatment results. The results of field studies in Sotanga Meoţian, Targoviste Răsvad Gura Ocnitei Meoţian III, Calinesti Dacian, Moreni, Gura Ocnitei and South Dacian, which are in an maturated/advanced stage of production consisting mostly of high permeability sand layers with high variation of stability (good to poor ) have been used in formulating the stimulation acidizing best practices in OMV Petrom. 9.1.1 Objectives of Well Stimulation by Acidizing The key objectives of well acidizing in OMV Petrom are to: • Remove near wellbore formation damage and decrease skin factor • Restore damaged matrix permeability in near well-bore reservoir area • Improve matrix permeability in near well-bore reservoir area • Maximize well productivity • Remove deposits from well tubular/wellbore cleanout. The improvement in productivity of wells that can be realized with matrix stimulation as shown in Figure 9-1 The plot shows that acidizing is more effective in restoring the original permeability by removing formation damage, than in increasing permeability over its original value. This is used as principal guidance in the company for selecting the best well candidate for application of stimulation by acidizing. 9.2 Well Acidizing Stimulation Technology In sandstone formations, acid treatments aim to remove near-wellbore flow restrictions and formation damage. The goal of these treatments is to return the near-wellbore area to its natural condition. In carbonates, dissolving matrix is one of the objectives, but bypassing a damage of the nearwellbore by creating new channels is the primary target. Usually, wellbore damage is caused by drilling or completion operations, fines migration, clay swelling or polymer plugging. To select an optimized fluid system for effective stimulation, the type of damage and the formation mineralogy must be known. The structured process of the design of a well acidizing stimulation job the following main phases: 1. Candidate selection and proper diagnosis of damage type - The best candidate well for a stimulation treatment is selected, regardless of the type of stimulation/remediation needed. Candidates are wells with damage to the wellbore, in the perforations and / or within the formations which is acid-removable. If the damage is not acid-removable, then it should not be acidized and is not a candidate. During this phase, the best treatment for the type of damage must be determined by assessing and, ideally, measuring the skin. The economically most attractive candidate is then selected based upon expected production gains. 2. Fluid selection - The appropriate fluids, acid types, concentration, treatment volumes and additives are selected. Careful thought should be given to the determination of appropriate additives and combinations for each case. 3. Pumping schedule and execution sequences - The number of stages and how much to pump in each stage (volumes, rates and time) are determined. 9-4 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 9. STIMULATION BY ACIDIZING 4. Acid placement and techniques - detailed simulation of the acidization process using the planned pumping schedule should be undertaken, including diversion. A major reason for unsuccessful acid treatments is that the acid does not go where it needs to go. Determination of the proper fluid placement method is thus a key factor in acid treatment design in both carbonates and sandstones. 5. Treatment monitoring, quality control and on site evaluation -The actual skin changes resulting from the stimulation treatment are compared to the predicted results. Quality control steps (during rig-up, before pumping, during pumping and flowback) should be implemented. 9.2.1 Total Skin factor and its use in OMV Petrom for Making Decision for Acidizing The skin is an important factor to decide whether or not to stimulate a well and what generic type of treatment would be most suitable. Since it represents the total additional pressure drop as compared to ideal conditions, in the near-wellbore region, its value is the combined effect of several parameters, including formation damage. To properly interpret the skin and therefore determine the appropriate remedial action, field engineers must analyze the contribution of each factor. This analysis should involve identifying skin damage which could be removed by stimulation and may result in additional opportunities for production improvement such as re-perforating. Candidate identification therefore requires an understanding of the various skins and recognizing skin damage. The production of newly completed well or worked-over well may be lower than expected, due to wellbore damage from the drilling/completion/workover process, or by mechanical difficulties in the overall completion process. All of these problems will result in an additional pressure drop near the wellbore, and thus affect the skin factor. Therefore, the key to candidate selection lies in the analysis of the various skin components. In Table 9-1 these skin component characteristics are summarized. Table 9-1 Summarized skin components Skin Components Characteristics Total skin factor (Horner skin) S Sdam Spart Sdev Sperf Sd,perf Sperf Sturb Skin caused by formation damage (positive). It is the component that needs to be removed with the matrix treatment. Skin caused by limited perforation height (positive). It results from the well not being perforated over the complete reservoir height, such as to minimise gas or water coning. Skin caused by wellbore deviation (negative). At high deviation angles, the increased effective length of the reservoir section open to inflow increases the natural well productivity. Skin caused by the presence of small perforations (positive or negative). The skin depends on the perforation size and phasing. Skin caused by reduced crushed-zone permeability around perforations (positive). Difficult to estimate due to many parameters that cannot be estimated reliably, like permeability of crushed zone, actual depth of penetration. Skin caused by gravel packing (usually positive). Theoretically, it may have a negative value in underreamed, open hole, gravel packed wells because of the increased effective wellbore radius. Skin caused by turbulent (non-Darcy) flow, mainly applicable to gas (positive). It is often caused by flow convergence because of inadequate dimensions and an inadequate number of perforations. Figure 9-1 illustrates how the skin factor varies with the damage ratio, kd/k, and damage zone radius, rd, for a vertical well with a radius of 0.0762 m. These variables determine the magnitude of the skin factor and control the well productivity. For instance, a reduction in permeability to less than one tenth of the initial value within 0.6 m of the wellbore axis results in a skin factor of approximately 18.7. http://www.petrom.com 9-5 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING Figure 9-1 Skin factor as a function of damage radius and damage ration (kd/k) The skin effect is a composite variable. The following sources of the nonideal flow should consider: • • • • • Formation damage, Limited entry completions effects, Perforation effects, Saturation blockage near the wellbore, and Gravel-pack completion effects. The composite skin factor can be calculated from well test data. It is very important to separate the observed skin factor into its components and to establish which near-wellbore flow restrictions can be removed by stimulation treatment and which require workover or recompletion. For good understanding of the skin related concepts it is enough to consider pseudo-steady flow only. Figure 9-2 Pressure profile of damaged and undamaged well Skin, S, is the composite of all non-ideal conditions affecting flow into the wellbore, and may generally be written, with its main components, as: 𝑆 = 𝑆𝑑𝑎𝑚 + 𝑆𝑝𝑎𝑟𝑡 + 𝑆𝑑𝑒𝑣 + 𝑆𝑝𝑒𝑟𝑓 ++𝑆𝑔𝑟𝑎𝑣𝑒𝑙 + ∑ 𝑃𝑠𝑒𝑢𝑑𝑜𝑠𝑘𝑖𝑛𝑠 (9-1) The last term in the above expression represents an array of pseudoskin factors. These pseudoskin effects are generally mechanical, resulting from obstructions to flow or because of turbulence effect and additional pressure drop. The real skin due to formation damage is that portion of the total skin that can be removed by matrix treatments. Sdam describes the permeability of the damaged to undamaged zones and the damaged radius, as shown on Figure 9-2. 9-6 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 9. STIMULATION BY ACIDIZING 9.2.2 Best Candidate Selection Process for Acidizing Despite the extensive research efforts done by the industry on the root cause of formation impairment and its remediation by matrix treatment, the failure rate of matrix acidizing treatments today is estimated at 60 to 70%. Worldwide, this failure rate represents a loss of millions of dollars in wasted stimulation expenditure and missed production. The primary causes for failed treatments have been poor candidate selection and poor treatment design with respect to fluid selection and placement. Another reason for the high failure rate of matrix acidizing treatments is the lack of proper technology transfer to the field. Because the industry often sees matrix treatments as lowtechnology treatments, little attention is given to design. Many candidates are normally selected by each Asset and they are sending for evaluation. The process of candidate selection applied in Assets includes: • Prepare list of candidate wells, • Review of well logs/records, reservoir characteristics and information on the completion/previous workovers, • Map the productivity of each well, • Establish reasonable upper production potential for matrix stimulation techniques, • Evaluate potential mechanical problems, and • Focus on wells with the highest reward and lowest risk. The candidate wells are then analyzed by Stimulation Team in Production Engineering according to the following six criteria: 1. PVT matching in order to select the best PVT correlation to simulate well behavior when acid is injected. 2. Verification of the remaining reserves and the current water saturation. 3. Evaluation of an approximate damage type from history well data and skin factor using an analytical model (Resestim 7 in house made software or licensed software Prosper for integrated system analysis). 4. Predict well productivity index (PI) increase after stimulation job based on new skin. 5. Make production forecast using material balance equation for oil and gas wells. 6. Estimate NPV and Cash Flow based on production forecast. All economically feasible wells are candidates. The design of the stimulation is made for the economically most attractive candidates. A system for the selection of the acid should be used and the calculation of the other design parameters is based on models/algorithms that will be explained later. 9.2.3 Review of the Most Frequent Damages in OMV Petrom and General Selection of Treatment Once damage has been characterized in a well, its origin must be ascertained to help determine the correct remedial action. Various types of damage can exist since almost every operation performed on the well is a potential source of damage. The physical characteristics of the damage are an essential parameter since this determines the desired characteristics of the treating fluid. The physical characteristics of the damage are the main criterion adopted to categorize the various types of damage indicated in Figure 9-3 (seven basic types of damages). Emulsions The intermixing of oil- and water-base fluids in the formation often results in the formation of emulsions. Emulsions can have high viscosity, particularly water-in-oil emulsions. Typically, they are http://www.petrom.com 9-7 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING formed due to invasion of drilling/completion filtrate or treatment fluids into the formation. High pH filtrates from mud or cement slurry or low pH filtrate from acidizing can emulsify some formation oils. Similarly, hydrocarbon filtrates from oil-based drilling or stimulation fluid can form emulsions with some formation brines. Emulsions are stabilized by surface active materials (surfactants) and by fines, which are either present in the "treating" fluids or are generated through the fluid/rock interaction. Generally, mutual solvents with or without demulsifiers are used for treating such problems. Figure 9-3 Formation damage types Wettability Change Partially or totally oil wetting a formation reduces the relative permeability to oil. This may occur due to adsorption of surface active materials from oil-based drilling, workover or completion fluids on the rock. This type of damage is removed by the injection of mutual solvents to remove the oil wetting hydrocarbon phase, followed by the injection of strongly water-wetting surfactants. Water Block A water block caused by an increase in the water saturation near the wellbore decreases the relative permeability to hydrocarbons. Waterblock can form either during drilling and completion operations through invasion of water-base filtrate, or during production through fingering or coning of formation water. The formation of a water block is favored by the presence of pore lining clays such as illite. The hairy shape and large surface area of these clays increase the adsorption of water on the pore wells. A water block is usually treated by reducing the surface tension between water and oil (HF acids). Nonaqueous acids (such as alcoholic acid) are particularly suitable in (gas) wells where a water block problem is suspected because they also increase the vapor pressure and reduce the surface tension between water and gas. Scales Scales are precipitated mineral deposits. They can precipitate in the tubing, perforations and/or formation. Scale deposition occurs during production because of the lower temperatures and pressures encountered in or near the wellbore. Scales can also form by mixing of incompatible waters: formation water and either fluid filtrate or injection water. Various solvents can be used to dissolve scales, depending on their mineralogy. The most common types of scales encountered in a well are: 9-8 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 9. STIMULATION BY ACIDIZING • • • • • • Carbonate scale (CaCO3 and FeCO3): CaCO3, is the most common scale, occurring in reservoirs rich in calcium and carbonate and/or bicarbonate ions. Hydrochloric acid will radial dissolve all carbonate scales. Sulphate scales occurring mainly as gypsum (CaSO4, 2H2O) or anhydrite (CaSO4). The less common barytine (BaSO4) or strontianite (SrSO4) is much more difficult to remove but, their occurrence is more predictable. EDTA will dissolve calcium sulphate. Barium and strontium sulphates can also be dissolved with EDTA provided the temperature is high enough and the contact times sufficiently long (typically 24 hr soaking period is required for a 4000m well with a BHST of about 100oC Chloride scales such as sodium chloride: These are easily dissolved with fresh water or very weak acidic (HCl, acetic) solutions. Iron scales such as sulphide (FeS) or oxide (Fe2O3): Hydrochloric acid with reducing agents and sequestrant will dissolve such scales and prevent the reprecipitation of by-products such as iron hydroxides and elemental sulphur. Silica scales: Generally occurring as very finely crystallized deposits of opal or chalcedony. Hydrofluoric acid can dissolve silica scales. Hydroxide scales such as magnesium (Mg[OH]2) or calcium (Ca[OH]2) hydroxides: Hydrochloric acid or any acid that can sufficiently lower the pH and not precipitate calcium or magnesium salts can be used to remove such deposits. Contact time is a very important factor to consider in the design of a scale removal treatment. The major problem when treating scale deposits is to allow sufficient contact time for the acid to reach and effectively dissolve the bulk of the scale material. The treating fluid must contact and effectively dissolve most of the scale in order for the treatment to be successful. Organic Deposits Organic deposits are precipitated heavy hydrocarbons (paraffin or asphaltenes). They are typically located in the tubing, perforations and/or the formation. Although the mechanisms of creation of organic deposits are numerous and complex, the principal mechanism is a change in temperature or pressure near the wellbore during production. The heavy hydrocarbon fractions do not remain dissolved in the oil and begin to crystallize. Cooling down the wellbore or injecting of cold treatment fluids has the same overall effect as a temperature drop during production. The deposits are usually re-dissolved by organic solvents. Blends of solvents can be tailored to a particular problem, but an aromatic solvents is an efficient, general purpose solvent, particularly for paraffins. The addition of a small amount of alcohols is often beneficial when dissolving asphaltenes. Organic deposits must not be confused with another type of deposit called sludge. This deposit is a reaction product between certain crude oils and strong inorganic acids. Once formed, sludge cannot be dissolved. Mixed Deposits Mixed organic/inorganic deposits are a blend of organic compounds and either scales or silts and clays. When migrating fines associated with an increase in water production in a sandstone reservoir become oil-wet, they act as a nucleation site for organic deposits. This type of combined deposits requires the use of a mixed solvent. Silts and Clays Damage due to silts and clays includes the invasion of the reservoir permeability by drilling mud, the swelling and/or migration of reservoir clays. Clays or other solids from the drilling, completion or workover fluids can invade the formation. When the differential pressure is sufficiently large and the http://www.petrom.com 9-9 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING size of the particles is smaller than the pore throat openings, they are forced into the pore network and tend to plug the network, resulting in damage. When water-based filtrate from drilling, completion, workover or treating fluids invades the porosity of the reservoir, it can disturb the equilibrium between the clays and formation water. This is normally due to a change in salinity, which creates imbalances in the forces between clays. Smectite clays can swell and drastically reduce permeability. Flocculated aggregates of kaolinite can be dispersed, and subsequently block pore throats. This disturbance of native clays is the most common and, probably the most important cause of damage. During production, particles can become dislodged and migrate with the produced fluids. The particles can bridge near the wellbore resulting in reduced productivity. When the damaging particles come from the reservoir rock, they are usually referred to as "fines". This is a generic term that includes clays (phyllosilicates with a size of typically less than 4 micrometers) and silts (silicates or aluminosilicates with a size between 4 and 64 micrometers). These particles are soluble in hydrofluoric acid mixtures. Damage due to fines is located in the near wellbore area within a 0.9 m to 1.2m radius. Damage may also occur in a gravel pack in sandstones it is removed by treatment with an acid containing HF: Mud Acids of various strengths or Clay Acid systems. An HCl system is normally used to remove fines damage in a carbonate formation. Since the fines are not dissolved, yet are dispersed in the natural fractures or in the wormholes just created, nitrogen is normally recommended when the well has low bottom pressure. The nitrogen will enhance fines removal. Due to the complexity of the fines problem and its impact on treatment design this manual contains, in the following two chapters, detailed information on the removal of fines damage in sandstones and carbonates respectively. 9.3 Well Acidizing Methods Applied in OMV Petrom There are two principal matrix acidizing treatment methods used in OMV Petrom in which applied treatment pressure at the bottom is lover than formation fracturing pressure are: 1. Sandstone acidizing, and 2. Carbonate Acidizing Matrix acidizing of sandstones with mud acid is directed at silt and clay damage removal. A treatment may also be designed to remove other types of damage, such as: emulsion, wettability change, water block, organic deposits, and mixed deposits. Samples of the formation, produced fluids, and possibly even tubing, are important to ascertain formation damage type and well condition. The sensitivity of the formation to a treating fluid may result in deconsolidation due to dissolution of the cementing material. Precipitates may form from Fe, Na, K dissolved by mud acid. Fines released during HCl or Mud Acid stages may create damage. Low permeability wells are very susceptible to this damage mechanism. The primary objective of matrix acidizing in carbonates is to dissolve the matrix, but most of all, to bypass damage, by creating wormholes and thus to increase the effective wellbore radius and its average effective permeability. The formation is therefore actually stimulated (unlike in sandstone reservoirs), and the skin value is decreased, often to negative values. Considering the main types of potential damages the general best practice workflow of well stimulation by acidizing is shown on Figure 9-4. 9-10 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Workover Best Practices 9. STIMULATION BY ACIDIZING Figure 9-4 Formation damage types and treatment selection The final fluid selection for treatment The first step in planning to acidize any type of formation (sandstone and/or carbonate) is to use key reservoir characteristics like gross lithology, mineralogy composition and temperature for fluid selection. The general workflow applied in OMV Petrom for basic fluid selection is shown in Figure 9-5. http://www.petrom.com 9-11 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 9. STIMULATION BY ACIDIZING Figure 9-5 Basic Fluid Selection for Well Acidizing 9-12 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 9. STIMULATION BY ACIDIZING 9.3.1 Sandstone Treatment fluid selection in sandstone formations is highly dependent on the mineralogy of the rock as well as the damage mechanism. Hydrofluoric (HF) acid is typically used to dissolve the damaging silicate particles (Figure 9-6). Nonacid systems are sometimes used to disperse whole mud and allow it to be produced with the treating fluid. The criteria for selecting the treating fluid for any treatment stage are mineralogy (solubility of minerals in acid, clays/silt, iron and zeolites content and other lithology criteria such as chlorite and glauconite content), petrophysical properties (permeability) and well conditions (temperature, formation damage mechanism). Figure 9-6 Constituents of sandstone which are soluble in HCl/HF acid systems HF Reactions in Sandstones The reaction of HF acid with the damaged matrix occurs in three steps. Live HF reacts with sand, feldspar and clays, which results in silicon fluorides and some aluminum fluorides as reaction products. The HF acid provides the greatest dissolving power during this phase, while only a small amount of HCl is consumed. The depth of invasion of the live HF acid is normally 5-15 cm from the wellbore. The primary stage is the stage that removes skin damage. The reaction of hydrofluoric acid (HF) on the pure quartz component of sandstone described by the equations 9-2 and 9-3 results in silicon tetrafluorid (SiF4) and water: 4HF + SiO 2 ⇔ SiF 4 + 2 H 2 O (9-2) SiF4 + 2HF ⇔ H2 SiF6 (9-3) The stoichiometry of this reaction shows that 4 moles of HF are needed to consume one mole of SiO2. However, the produced SiO4 may react with HF to form fluosilicic acid (H2SiF6) resulting in the silicon hexafluoride anion SiF62-. If the reaction goes to completion, 6 moles of HF, rather than 4, will be consumed to dissolve 1 mole of quartz. A complication is that the fluosilicate may exist in various forms, so that the total amount of HF required to dissolve a given amount of quartz depends on the solution concentration. The most common primary reactions involved in acidizing are summarized in Table 9-2. http://www.petrom.com 9-13 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING Table 9-2 Primary chemical reaction in acidizing HYDROFLORIC ACID - HF Quartz: 4HF + SiO2 ↔ SiF4(silicon tetrafluoride) + 2H2O SiF4 + 2HF ↔H2SiF6 (fluosilicic acid) or SiF4 + 2F- ↔SiF62- (Silicon hexafluoride anion) Albite (sodium feldspar): Na AlSi3 + 14HF + 2H+ → Na+ + AlF2+ + 3SiF4 + 8H2O Orthoclase (potassium feldspar): KAlSi3O8 + 14HF + 2H+ → K+ + AlF2+ + 3SiF4 + 8H2O Kaolinite: Al4Si4O10(OH)8 + 24HF + 4H+ → 4AlF2+4SiF4 + 18H2O Montmorillonite: Al4Si8O20(OH)4 + 40HF + 4H+ → 4AlF2+ + 8SiF4 + 24H2O Calcite: 2HF+ CaCO3→CaF2 + CO2 + H2O Note: CaF2 is very low soluble FLUOBORIC ACID – HBF4 HBF4 + H2O → HF +HBF3OH rapid response HBF3OH + HF + H2O →HBF4 slow reaction Fluoboric acid-based solution (Clay Acid) One of the key problems that can occur after acidizing is migration of fine particles in both, unconsolidated and consolidated sandstones causing the blockage of the pores, and in some cases increasing the tendency of forming viscous stabilized emulsions. Migration of fine particles after reaction with HF is primarily related to the concentration of HF and its reaction speed. To avoid undesirable precipitations of secondary products of reaction, rock deconsolidation and migration of fine particles, some special acids compositions have developed that can help in avoiding a problems. The most frequent used is Fluoboric acid (HBF4) Fluoboric acid (HBF4) is used to produce HF through the hydrolysis according to the chemical reaction shown in Table 9-2. At any time there is only a limited amount of HF acid available and the probability of forming precipitates of fluosilicates, fluoalumintes or silica is decreased significantly.. The acid is consumed by reaction on clay surface minerals followed by hydrolysis to produce more HF. Because of this, HBF4 is considered as acid with delayed reaction (“retarded acid”). If the temperature is higher than 95 oC, the kinetic of the hydrolysis is rapid. The reaction of fluoroboric acid with silica is approximately 10 times lower if temperature is less than 65 oC. A major advantage of HBF4 is its ability to inhibit the migration of fines present in sandstone by coating the initial surface with borosilicate as a product of reaction during treatment. Experimental results showed that when the cores containing pore lining illite have been treated by HBF4, the poorly crystallized precipitate of KBF4 has been observed at the outlet of cell and it does not have a damaging effect. The positive effects of using HBF4 and major advantages of its application are: • The dissolving potential of clay acid is still high (for example, 8% of HBF4 is approximately equal to 2%HF). • The borosilicate coating stabilizes fines and makes them less sensitive. Because of these HBF4 is recommended always when problems with migrating fines exist, what is often case in the maturated wells completed with gravel pack. 9-14 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 9. STIMULATION BY ACIDIZING Precipitation of reaction product When the live HF has been consumed, the secondary reaction proceeds as the reaction of dissolved silicon fluorides on clay and feldspar. This reaction releases a large amount of aluminum and other cations into solution, consumes a large amount of HCl, and forms silicon precipitates and sodium and potassium fluosilicates, which can precipitate if the selected HF concentration is too high relative to the minerals that contain sodium and potassium. The reaction is complete when the silicon fluorides are no longer present, which is normally within 1.2 m from the wellbore. The precipitation of fluosilicates can be very damaging, and is one of the main causes of HF treatment failures, particularly in formations containing large amounts of K-feldspar. However, it is not really a problem if the fluid is kept in motion. If live HF is shut in during an acid job, severe and permanent damage to the matrix permeability can result from silica gel precipitation. Reaction with feldspar, chert, mica and clay components of sandstones also results in SiF62-anion, but, in addition, produces a range of aluminum complexes: AlF2+, AlF+2, AlF3, AlF4-, AlF52- and AlF63s-. The concentration of each aluminum complex depends on the concentration of free fluoride ions in the dissolving solution. Some of these products combine with free sodium, potassium, and calcium ions to produce four compounds with varying degrees of solubility in the spending acid: • • • • Sodium fluosilicate ( Na2SiF6), Sodium fluoaluminate (Na3AlF6), Potassium fluosilicate ( K2SiF6), and Calcium fluosilicate ( CaSiF6). Matrix treatments are always designed to prevent the formation of these compounds in order to remove any risk of precipitation. The tertiary reaction proceeds as the reaction of dissolved aluminum fluorides on clay and feldspar. The tertiary reaction is slower than the secondary reaction and it is much faster on clays than on feldspars. However, it is an important reaction that must be considered, because it causes further reduction in the HCl content of the spent HF. Once the acid is consumed, alumino-silicate scaling occurs, within a distance of 1.2 m to 1.8 m from the wellbore. There are many precipitation reactions that take place during an HF sandstone acidizing job. These reactions are unavoidable, but their effect on stimulation response can be minimized with proper fluid selection and treatment design In Table 9-3 damaging HF reactions in sandstones resulting in precipitation are summarized. Table 9-3 Damaging HF reactions in sandstones Reaction HF + carbonates (calcite, dolomite) HF + clays, silicates HF + feldspars HF + clays, feldspars HF + illite clay Spent HF + formation brine, seawater HCl-HF + iron oxides and iron minerals HF + calcite (calcium carbonate) Precipitate(s) Calcium and magnesium fluoride (CaF2, MgF2) Amorphous silica (orthosilicic acid) (H4SiO4) Sodium and potassium fluosilicate (Na2SiF6, K2SiF6) Aluminum fluorides (AlFn3-n) Aluminum hydroxides Na2SiF6, K2SiF6 Na2SiF6, K2SiF6 Iron compounds Calcium fluosilicate 9.3.2 Carbonate There are two basic types of acid treatments applicable to carbonates in OMV Petrom. They are characterized by injection rates and pressures. Acid treatments with injection rates below formation fracturing pressure, called matrix acidizing and acid treatment with injection rates above fracturing http://www.petrom.com 9-15 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING pressure (called acid fracturing, see Chapter 11). Matrix acidizing is applicable only to formation exhibiting formation damage. In the case of naturally fractured formations acidizing at matrix rates even in an undamaged carbonate formation may result in an acceptable stimulation response. Whereas the purpose of sandstone acidizing is to dissolve the damage, the primary objective of matrix acidizing in carbonates is to dissolve the matrix, but most of all, to bypass damage, by creating new channels and thus to increase the effective wellbore radius and its average effective permeability. The dissolution of carbonate rocks by acid results in rapid generation of irregularly shaped and empty channels called wormholes, as shown in Figure 9-7. Because of the randomness of porous media, it had been shown that during dissolution two neighboring pores can coalesce if sufficiently enlarged. It is difficult to model or predict the development of wormhole formation in a real rock as the mineralogy will never be 100% carbonate. Figure 9-7 Various Wormhole structures The formation is therefore actually stimulated (unlike in sandstone reservoirs), and the skin value is decreased, often to negative values. Acids used in carbonate acidizing and chemistry of reactions Commonly used acids to stimulate carbonate formation are: • Hydrochloric (HCl), • Acetic (CH3COOH)/ week organic acid, and • Formic (HCOOH)/week organic acid. Carbonate acidizing solely with HCl, is not complicated by a tendency for precipitates to form, as is the case for sandstone acidizing. The reaction products CaCl2, MgCl2 (dolomites) and CO2 are readily soluble in water. Therefore, the formation of a precipitate or a separate CO2-rich phase is generally not a problem. Under comparable conditions weak organic acids react more slowly than hydrochloric acid and they can be used instead of HCl when high bottomhole temperatures (above 200oC) prevent efficient protection against corrosion. Acetic acid is easier to inhibit than formic acid and is used more often. Table 9-4 illustrates the maximum protection times with corrosion inhibitors at various temperatures and acid concentrations. Table 9-4 Maximum protection time for different acids and temperatures 9-16 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 9. STIMULATION BY ACIDIZING The following factors affect the spending rate of acid in carbonate formations: temperature, pressure, acid type, acid concentration, acid velocity, reaction product and formation composition (structure and mineralogy). Acetic and formic acids react with CaCO3 to form calcium acetate and formate. The formic acid concentration must be limited to about 10% as calcium formate precipitates above that level. Acetic acid can be used at higher concentrations, as calcium acetate remains soluble, but best practice is to use not more than 10% acetic acid. None of the organic acids react appreciably with SiO2. They react with iron compounds or minerals containing iron. Acetic acid forms a complex with iron in solution and helps prevent iron precipitation up to 60oC. In reservoirs with high iron content, it is necessary to cut back on HCl concentration or substitute part or all the HCl with acetic acid. Chelating agents, such EDTA (ethylendiaminetetraacetic acid), are even weaker acids than acetic and formic acids. For example, 9% disodium EDTA solution has the approximate dissolving power of 2.2% HCl. It is not common to use chelating acid in matrix acidizing because of their cost relative to the common acids (HCl, acetic and formic acid) and lower dissolving power. The summarized chemical reactions of HCl and organic acids with carbonate are shown in Table 9-5. Table 9-5 The reaction of HCl with carbonates HYDROCHLORI AClD Calcium carbonate : 2HCl + CaCO3↔CaCl2 + CO2↑ + H2O Dolomite: 4HCl + CaMg(CO3)2 ↔ CaCl2 + MgCl2 + 2CO2↑+ 2H2O Siderite: 2HCl+ FeCO3 ↔ FeCl2 + CO2 + H2O Organic Acids Calcium carbonate and Acetic Acid : 2CH3COOH + CaCO3↔Ca(CH3CO2)2 + CO2↑+ H2O Dolomite and Acetic Acid: 4CH3COOH + CaMg(CO3)2↔Ca(CH3CO2)2 + Mg(CH3CO2)2 +2 CO2↑+ H2O Calcium carbonate and Formic Acid : 2HCOOH + CaCO3↔Ca(HCO2)2 + CO2↑+ H2O Dolomite and Formic Acid: 4HCOOH + CaMg(CO3)2↔Ca(HCO2)2 + Mg(CH3CO2)2 + 2CO2↑+ H2O However, despite the simplified chemistry, HCl acidizing of carbonates is a difficult process to model. The reason for this is the high rate at which the reactions take place as compared with that of HF with the various minerals prevalent in sandstones. Wormhole growth depends on the acid injection rate, the diffusion rate and the formation’s surface reaction rate. Wormholes will only form if the diffusion rate determines the overall spending rate, which happens if the acid/rock reaction rate is high. The diffusion rate determines the rate at which acid travels from the bulk of the fluid to the rock surface as shown on Figure 9-8. The treatment objective is to form the longest and deepest penetrating wormholes as possible. Wormholing efficiency under expected downhole and surface treating conditions is a major criterion in fluid selection. Images shown in Figure 9-9 are neutron radiographs of cores acidized under different conditions. Experiments have shown that the quantity of rock dissolved, i.e., the acid penetration depends on acid velocity. One advantage of wormhole formation is that the near-wellbore damage can be bypassed and the “effective” treated zone becomes much larger than in sandstone acidizing (for the same amount of rock dissolved) or in matrix acidizing of carbonates using slow reacting acids when http://www.petrom.com 9-17 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING the kinetics is limited by surface reactions. In addition, problems of deconsolidation in the nearwellbore area are less severe. Figure 9-8 Wormholing controlled by diffusion Major wormhole structure possibilities can be categorized, as a function of injection rate and acid/rock reactivity, as follows: • Face dissolution (no Wormholing), • Conical (single channel with limiting branching), • Dominant wormholes (primary channels with some branching), • Ramified wormholes (extensive branching), and • Uniform dissolution. Figure 9-9 Various Wormhole structures (Fredd and Fogler, SPEJ, 1998, 1999; Hoefner and Fogler, AlChEJ, 1998) 9.4 Technology Workflow of Best Practices for Fluid Selection, Treatment Design and Job Execution 9.4.1 Sandstone Matrix Acidizing Treatment Fluid Selection for Acidizing Treatment Fluid selection for each stage of the treatment must take account of all of the parameters previously discussed: dissolution of damage, compatibility with rock minerals and reservoir fluids and potential damaging reaction products. Since silts and clays are the component minerals that react with HF acid to cause potentially damaging precipitates, the higher the silt and clay content, the greater the risk of precipitation. Increasing the HCl:HF ratio is one way to retard precipitation. HCl increases the dissolving power of the HF and low-HF content reduces the precipitation of silica. Therefore, as the silt and clay content of the formation increases, the recommended HCl: HF ratio also increases. The 9-18 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 9. STIMULATION BY ACIDIZING presence of HCl sensitive clays will also affect the type of acid chosen. X-ray diffraction (XRD) analysis is the most common test used to determine formation mineralogy. In OMV Petrom two different models for acidizing fluid selection are in use: • Model 1: Use mineralogy composition and rock/reservoir permeability. • Model 2- Use mineralogy composition and temperature. Formation solubility in both HCl and HCl: HF can be used to approximate the total silt and clay content. The difference in these solubilities correlates well to silt and clay content by XRD analysis as seen in Table 9-6. Solubility information, however, does not indicate the type of clay present. Table 9-6 Solubility of Common Minerals in Acid *Insoluble (IS), High (H), Moderate (M), Low (L), Very Low (VL), http://www.petrom.com 9-19 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 9. STIMULATION BY ACIDIZING Model 1-Sandstone Acidizing Workflow Model 1- Preflush/Overflush stage Fluid Selection Using mineralogy composition and reservoir permeability workflow for selecting the best fluid for pre-flush treatment is shown in Figure 9-10 and summarized Table 9-7 if the content of carbonate is less than 20%, HCl is used as a preflush to an HF acid. Normally the greater the permeability, the lower the chance of creating fines migration damage during the HCl preflush. Since clay and silt type materials may react with HCl to produce mobile fines, the HCl concentration decreases with increased fines content. The clay content is the dominating species due to its large surface area and cation exchange capacity (CEC). Figure 9-10 Model 1 Preflush/Overflush Fluid Selection Table 9-7Model 1 Preflush Fluid Selection Mineral Composition > 100 mD <10% Silt and < 10 % Clay 15% HCl >10% Silt and >10 % Clay >10% Silt and < 10 % Clay 10% HCl >10% Silt and > 10 % Clay 20-100 mD < 20 mD 10% HCl 7.5% HCl 7.5% HCl 5% HCl At the presence of HCl sensitive minerals, like chlorite, glauconite and zeolites it is advisable to keep the pH low to so all reaction products dissolved and the selected fluid for preflush should be corrected according to the following practices shown in Table 9-8. 9-20 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 9. STIMULATION BY ACIDIZING Table 9-8 Model 1 Preflush /Overflush fluid selection including presence of HCl sensitive minerals Lithology Criteria (%) Zeolites Chlorite+Galuconite Silt and Clay Permeability (mD) Acid Concentration (%) >2 Any Any Any 10% Acetic >=2 >6 Any Any 10% Acetic <=2 3-6 >10% Silt and >10 % Clay Any 5%HCl+5%Acetic <=2 3-6 <10% Silt and < 10 % Clay Any 7.5%HCl+5%Acetic 0-2 <=3 >10% Silt and >10 % Clay >100 10%HCl+5%Acetic 0-2 <=3 <10% Silt and < 10 % Clay >100 15%HCl+5%Acetic 0-2 <=3 >10% Silt and >10 % Clay 20-100 7.5%HCl+5%Acetic 0-2 <=3 <10% Silt and < 10 % Clay 20-100 10%HCl+5%Acetic 0-2 <=3 >10% Silt and >10 % Clay <=20 5%HCl+5%Acetic 0-2 <=3 <10% Silt and < 10 % Clay <=20 7.5%HCl+5%Acetic 0 <=3 >10% Silt and >10 % Clay >100 10%HCl 0 <=3 <10% Silt and < 10 % Clay >100 15%HCl 0 <=3 >10% Silt and >10 % Clay 20-100 7.5%HCl 0 <=3 <10% Silt and < 10 % Clay 20-100 10%HCl 0 <=3 >10% Silt and >10 % Clay <=20 5%HCl 0 <=3 <10% Silt and < 10 % Clay <=20 7.5%HCl Summarizing the previous table, the following rules/best practices have been using: If 4-6% chlorite/glauconite then use <20md Guidelines with 5% Acetic Acid If 6-8% chlorite/glauconite then use only 10% Acetic Acid preflush to Mud Acid If <2% Zeolite then use 5% Acetic Acid in all HCl systems If 2-5% Zeolite then use only 10% Acetic Acid preflush Model 1 Main Treatment Fluid Selection Silt and clay content and permeability are used as selection criteria. Silt and clay percentages are calculated internally from the input lithology. The total of mica and feldspars are considered to be silts. The total of kaolinite, mixed layer, illite, smectite, glauconite, chlorite, and zeolites are added for clays. The permeability of the formation influences the selection of the treating fluid in two ways. First, permeability affects the type and extent of damage. A highly permeable formation can easily be penetrated by foreign solid particles of fluids, and the depth of the damage can be large. On the other hand, low permeability sandstone will merely be damaged by invasion of foreign particles. However, this type of formation can be more sensitive to the invasion of foreign fluids because the small pores often contain a large quantity of clays that have a high reactivity toward fluids. The permeability also influences the amount of damage caused by precipitates. A low permeability formation is more severely damaged by precipitates than a formation of high permeability. The same is true for damage resulting from water block. In some cases, the type of produced fluids precludes the use of some treating fluids. This applies to gas wells, where it is preferable to minimize the use of purely water based fluids. Agents that lower surface tension (surfactants, alcohols) and/or gases (foams) are recommended. In other cases, adverse reactions between acids and formation oils or formation waters dictate the use of only specific acid formulations. Figure 9-11 and Table 9-9 show mud acid fluid selection best practice workflow for sandstone acidizing treatment. http://www.petrom.com 9-21 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 9. STIMULATION BY ACIDIZING Figure 9-11 Model 1 Main/Base Treatment Fluid Selection Table 9-9 Model 1 Main/Base Treatment Fluid Selection Mineral Composition <10% Silt and < 10 % Clay >10% Silt and >10 % Clay >10% Silt and < 10 % Clay >10% Silt and > 10 % Clay > 100 mD 20-100 mD 12% HCl +3%HF 8% HCl +2%HF 13.5% HCl +1.5%H9% HCl +1%HF 12% HCl +2%HF < 20 mD 6% HCl +1.5%HF 4.5% HCl +1%HF 9% HCl +1.5%HF 6% HCl +1%HF If 4-6% chlorite/glauconite then use <20md Guidelines with 5% Acetic Acid If 6-8% chlorite/glauconite then use 10% Acetic Acid preflush to Mud Acid plus 5% acetic acid If chlorite/glauconite > 8%, then use 10% acetic acid and organic mud acid If <2% Zeolite then use 5% Acetic Acid in all HCl systems If 2-5% Zeolite then use 10% Acetic Acid preflush and overflush to mud acid containing 10% acetic acid If > 5% Zeolite then use 10% Acetic Acid preflush and overflush to 10% citric acid / HF. Formations with more than 2% zeolites are considered sensitive and use the above flowchart for acid selection. For moderate zeoloite compositions, acetic acid is used as the acid preflush and overflush and is added to the conventional mud acid formulations with the HCl. The organic acid is to keep the pH low, acting like a buffer in these acid solutions. Reaction products are more soluble in low pH. For higher zeolite compositions, acetic is also used for the preflush and overflush, but organic mud acids made with citric acid are recommended. The workflow (Figure 9-12, Figure 9-13 and Figure 9-14) and Table 9-10 lists the recommendations based on these parameters. 9-22 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 9. STIMULATION BY ACIDIZING Figure 9-12 Main Treatment Fluid Selection including presence of high sensitivity Clays and Zeolites http://www.petrom.com 9-23 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 9. STIMULATION BY ACIDIZING Figure 9-13 Main Treatment Fluid Selection including presence of high sensitivity Clays, Chlorite and Glauconite 9-24 http://www.petrom.com 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 9. STIMULATION BY ACIDIZING Figure 9-14 Model 1 Main/Base Treatment Fluid Selection including presence of high sensitivity Clays, Zeolites and Glauconite http://www.petrom.com 9-25 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING Table 9-10 Model 1 Main/Base Treatment Fluid Selection including presence of high sensitivity Clays, Zeolites and Glauconite 9-26 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 9. STIMULATION BY ACIDIZING Model 2-Sandstone Acidizing Workflow Model 2- Preflush/Overflush stage Fluid Selection The formation temperature is an important factor because it influences the efficiency of corrosion inhibitors and the reaction rates. Several treating fluids decrease reaction rates at high temperatures and provide deeper live-acid penetration. The workflows shown in Figure 9-15 and Figure 9-16 as well as in Table 9-10 and Table 9-11 can be used as guidance for fluid selection for Preflush/Overflush and Main treatment. Figure 9-15 Model 2 Preflush/Overflush Fluid Selection including presence of high sensitivity Clays, Zeolites and Glauconite http://www.petrom.com 9-27 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING Table 9-11 Preflush /Overflush fluid selection including presence of HCl sensitive minerals and temperature Model 2 Main Treatment Fluid Selection Figure 9-16 Model 2 Main Treatment Fluid Selection including presence of high sensitivity Clays and reservoir temperature 9-28 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 9. STIMULATION BY ACIDIZING Table 9-12 Main Treatment Fluid Selection including presence of HCl sensitive minerals and temperature 9.4.2 Applied Sandstone Design Procedure A sandstone acidizing design procedure in OMV Petrom consists of the following distinct stages: 1. Tubing pickling stage/wellbore cleanup Wellbore cleanup is commonly used to remove scale, paraffin, bacteria or other materials from the tubing, casing or gravel-pack screen. The injection string (production tubing, drill pipe or coiled tubing) should be cleaned (pickled) prior to pumping the acid treatment. The pickling process may be multiple stages, consisting of solvent and acid stages. An acid pickling job of tubing/casing can be done by simply spotting around 2.4 bbl/1000 feet (1.2 lit/m) of 3-20% HCl down the tubing and up the annulus. A typical pickling solution is a 7.5% HCl solution containing an iron control agent and corrosion inhibitor. Often the same acid mixed for use in the HCL preflush may be used as the pickling solution. 2. Preflush Non-Acid A water displacement stage, consisting of 3-5% NH4Cl solution, depends on concentration of smectite, illite, kaolinite, chlorite and feldspar, according to: Concentration%=3+(%smectite*0.3+%illite*0.12+%kaolinite*0.08+ %chlorite*0.12+%feldspar*0.05) This is considered to displace formation water containing bicarbonate and sulfate ions. Typical volumes are 500 to 1000 l/m (40 to 80 gal/ft) Acid preflush The main purpose of the standard preflush with 5%-15% HCl is to dissolve carbonate constituents of the reservoir. This is to prevent the possibility of forming CaF2 as a mud acid precipitation product. Numerous acidizing jobs in OMV Petrom have proved that the best practices is to execute pre-flush with at least 50% of the volume of acid fluid for base/main treatment. http://www.petrom.com 9-29 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING Typical volumes are 620 to 1240 l/m (50 to 100 gal/ft) and it is preferable that the preflush penetrates the same distance as the HCl/HF mixture. Organic acids, such as acetic and formic, should be used in conjunction with, or instead of, HCl in sensitive formations the. Although they will dissolve the carbonate, they work more slowly and are especially applicable for high temperature conditions. When pumping organic acids as stand-alone fluids, they should be mixed in ammonium chloride rather than fresh water. Organic acids also act as a low-pH buffer and chelating agent that helps minimize the tendency of iron compounds to precipitate as the acid spends. However, they do not dissolve iron scale or prevent clay swelling. If iron and carbonate contents are high, both an acetic acid and HCl preflush can be used. If carbonate content is not high (less than 5%), then the organic acid can be applied only, without using HCl preflush. The best practice in OMV Petrom is to use 10% acetic acid contain 5% NH4Cl. Ammonium chloride is added for clay stability as use of acid without the addition of NH4Cl could cause clays swelling. 3. Main Treatment The main acid phase is commonly a mixture of HCl/HF. Volumes may range from 120-3000 l/m (10250 gal/ft) and more common volumes used in OMV Petrom are in the range 120 to 240 l/m (10 to 20 gal/ft). Volume is somewhat arbitrary, but should have a logical dependence on formation permeability, acid sensitivity, type and severity of damage and length of the treated interval. Risks associated with acidizing-such as fines migration, precipitation of reaction products, and rock deconsolidation-normally can be controlled (if not minimized or eliminated) by use of proper volumes and concentrations of acids. Mud Acid should not be used in formations with > 20% HCl solubility. Pore lining clays will be dissolved by mud acid. Thus, an abundance of chlorite in the pore throats may result in iron control problems. High permeability formations may experience deep invasion of particulates (drilling mud, barite, etc.).Low permeability formations will not experience severe particle invasion but will be more sensitive to damage by precipitates. Sludge or emulsion tendency of crude will dictate the use of a specific acid system. Treatments in gas wells include mutual solvents or alcohols. High temperature decreases live acid penetration and increases corrosion rates. Wells with low bottom hole static pressure (BHSP) should be treated with energized/foamed fluids. The well shut-in time after treatment should be minimized to reduce precipitation of reaction product. It is mandatory to avoid using NaCl, KCl, or CaCl2 brines in any HF treatment stages or in any stage immediately proceeding or following HF stages. 4. Overflush/Aterflush Overflush (or afterflush) is an important part of a successful acidizing treatment. The purposes of the overflush are: • Displace nonreacted mud acid into the formation, • Displace mud acid reaction products away from the wellbore, • Remove oil-wet relative permeability problems caused by some corrosion inhibitors, • Redissolve HF precipitates, if an acidic afterflush is used. Typical overflushes for mud acid treatments are: • Water containing 3 to 8% ammonium chloride, • Weak acid (3 to 10% HCl) in the cases when HCl is used as preflush fluid. • Acetic acid in the same concentration as HCl if formation mineralogy and temperature do not allow application of HCL. Alternatively, 3-8% of NH4Cl solution can be used. • Nitrogen (gas wells only and only following a water or weak acid overflush). 9-30 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 9. STIMULATION BY ACIDIZING Usually, the Overflush/Afterflush treatment can be performed with the same fluid concentration as used in the preflush. The typical volumes of 360 to 1200 l/m (25-100 gal/ft) are also very similar to those used in the preflush. The same fluid and concentration can be used in most cases. In gas wells, and sometimes in extremely water-sensitive formations, nitrogen is an effective overflush. The afterflush should occur immediately after the main acid injection in order have the most beneficial effect and to minimize precipitation of Si (OH)4. Wells should be put on production immediately after the treatment. In such case, the afterflush volume should be at least the same as the main HCl/HF volume. In cases when wells have to stay closed in for some time (which is to be avoided), the afterflush volume should be at least twice the HCl/HF volume in order to displace the reaction products to a distance where their influence is negligible (1 to 1.5m radial penetration). Certain chemicals (additives, inhibitors, iron complexing agents) may be used in addition to the basic solution of acid or NH4Cl in order to reduce problems with emulsion and sludge formation or prevent corrosion and scale precipitation. A large overflush is necessary to prevent the near-wellbore precipitation of amorphous silica. At formation temperatures of 95 °C or higher, amorphous silica precipitation occurs when the mud acid is pumped into the formation. The precipitate is somewhat mobile at first, but may set as a gel after the flow stops. It may be diluted and dispersed far enough from the wellbore to reduce its harmful influence if it is kept moving by the overflush. Diversion techniques One of the main reasons that acid treatments fail is that the injected acid is not correctly placed and does not have full contact with the damage. Selection of the proper fluid placement method is a key success factor in acid treatment design in both sandstones and carbonates and acid diversion is a challenge that has to be faced in either lithology. As acid is pumped, it flows preferentially along the most permeable path into the formation. The treated zone is commonly not adequately converged by the injected acid due to significant zone heterogeneities caused by big variations in zone properties. The acid opens high permeable zones even more, and less permeable, damaged zones are almost guaranteed not to receive adequate treatment. Some technique to divert the treatment fluid toward more damaged formation or damaged perforations is therefore mandatory. To approach full damage removal, acid must be diverted to the sections that accept acid the least – that is, those are most damaged There is a variety of diversion techniques, but there are three basic methods of acid placement (diversion techniques) as shown in workflows (Figure 9-17 and Figure 9-18 ): • • • • Mechanical placement o Packer isolation system , o Ball sealers (Not used in OMV Petrom) o Coiled tubing Chemical diversion o Bridging and plugging agents (inert materials in the of large sized particles from 10100 mesh, such as silica sand, water soluble agents like rock salt and benzoic acid, oil-soluble agents such as resins etc.) o Particulate diverters (small particle size, commonly below 0.1 mm and those can be water-fine grade of benzoic acid and oil soluble- blends of hydrocarbon resins) Foam Diversion (The most useful in gas well acidizing, in gravel pack completions and generally more effective in higher-permeability formations with deeper damage) Gels (more reliable than foam, but could be damaging, because higher concentration, gels will stay unbroken and therefore will not be completely cleaned up causing. This will damage the perforations. Commonly used is Hydroxyethylcellulose-HEC). http://www.petrom.com 9-31 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING Figure 9-17 General Workflow for choosing a diversion method for matrix acidizing Treatment fluid can be directed exclusively toward a low-permeability zone using injection string (tubing, drillpipe or coiled tubing equipped with mechanical packers). Flow can be blocked at individual perforations taking most of the treatment fluid by injecting ball sealers that seat on the perforations. In sandstone, microscopic agents such as oil-soluble resins can create a filter cake on the sand face. Chemical diverters such as viscous gels and foams created with nitrogen are used to block high –permeability pathways within the matrix. The requirements on any diverting agent are stringent. The agent must have limited solubility in the carrying fluid, so it reaches the bottom of the hole intact, it must not react adversely with formation fluids, it must divert acid. Also, the used diverter agent must be able to cleaned up rapidly and thereby avoid harming production. Ball sealers drop into the rathole as soon as injection halts or, if they are of the buoyant variety, they are caught in ball catchers at the source. Benzoic acid flakes dissolve in hydrocarbons. Oil-soluble resins are expelled or dissolved during the ensuing hydrocarbon production. Gels and foams break down with time. In practice, acid and diverting agents are pumped in alternating stages: first acid, then diverter, then acid, then diverter, and so on. The number of stages depends on the length of the zone being treated. Typically, one acid diverter stage combination is planned for every 5-8 m of formation. 9-32 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 9. STIMULATION BY ACIDIZING The current diverter technologies work sporadically and many times do more harm than good. Recent work shown that even when a diversion technique such as ball sealers is applied properly, over one third of the perforation become permanently blocked because the balls become lodged in the perforation. Chemical diverters often misused or do not meet expectations – rock salt is sometimes used by mistake with HF acid producing plugging precipitates, and so-called oil-soluble resins are infrequently only partially soluble in oil. It is necessary to choose properly the nondamaging diversion techniques whose effectiveness can be proved and documented. Foam and the use of inflatable packers on coiled tubing are viable techniques for positive diversion. Figure 9-18 Diversion selection workflow Injection pressure and rate strategy- Design model Additional reservoir parameters (fracture gradient, porosity, height, etc.) are required to calculate/estimate injection pressure and rate constraints for the acid. The acid use for the main treatment stage should be injected at a pressure that will not cause fracturing of the formation. In cases of very severe damage, the pressure may need to be increased above the fracturing pressure for a short period of time, but should be returned below fracturing pressure as quickly as possible. Application of this injection strategy during any treatment stage will allow removing damage more successfully. Maximum allowable injection pressure at the surface to avoid formation breakdown is defined by Eq. 9-4. Pinj max = ( FG H mp ) - Ph + P fr(i, j,k) - FS (9-4) http://www.petrom.com 9-33 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 9. STIMULATION BY ACIDIZING And maximum required hydraulic power of pump (Eq. 9-5) unit for performing acid treatment job is: P = 1.67 ⋅ Qi max ⋅ Pinj max (kW) (9-5) Where: FG- Formation fracture gradient (bar/m) Hmp- Mid perforation depth (m) Ph – Hydrostatic pressure of fluid treatment column (bar) Pfr – Pressure drop due to friction (bar) FS- Engineering design safety factor, usually can be taken in the range 20-30 bar Pi - Injection pressure (bar) P – Pumping unit required power (kW) The mMaximum injection rate that could be achieved, according to the Paccaloni model is defined by Eq.9-6. 𝑄𝑖𝑚𝑎𝑥= Where: �3.72×10−5 𝐾𝐻𝑚𝑝 ×�𝐹𝐺∙𝐻𝑚𝑝 −𝐹𝑆−𝑃𝑟 �� (9-6) 𝑟 𝑟𝑤 𝜇𝑖𝑛𝑗𝑓𝑙 ∙𝑙𝑛� 𝑏 � Qimax – maximum injection rate of acid (m3/min) K – reservoir permeability (mD) Hmp – average well depth (m) μinjfl – viscosity of injection fluid (mPas) rb – radius of injected fluid bank* (m) rw – well radius (m) Radius of injected fluid bank can be roughly calculated from the amount of stimulating fluid injected and the available pore space, using the following equation (Eq.9-7): 𝑉𝑓 = 𝜋 ∙ ∅ ∙ (1 − 𝑆𝑜, 𝑔𝑟 − 𝑆𝑤𝑐) ∙ �𝑟𝑏2 − 𝑟𝑤2 � (9-7) Where: Φ – porosity (frac) So,g r- residual saturation of oil or gas (frac) Sowc – connate water saturation (frac) Normally, the volume of treatment fluid pumped during matrix acidizing is not large and it is sufficient if the fluid penetrates the formation about 1-1.4 m, for which can assumed that rb changes only slightly. From numerous acidizing jobs it was found that for practical and quick estimation, an arbitrary rb =1.2 m (assuming that acid penetration will be under steady-state flowing conditions) 9-34 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 9. STIMULATION BY ACIDIZING Acid treatment volume and rate guidelines Table 9-13 Acid treatment guideline Table 9-14 Recommended volume of treatment fluid Additives Additives are added to the different stages of a treatment to prevent excessive corrosion, sludging and/or emulsions, provide a uniform fluid distribution, improve clean-up and prevent precipitation of reaction products. Additives are used not only for the main treatment but also, in pre-flushes and over-flushes to stabilize clays, disperse paraffin or asphaltenes and inhibit scale or organic deposition. Additive selection is primarily dependent on the treating fluid, the type of well, type of damages, bottomhole conditions, the type of tubular and the placement technique. Since there is a large number of an additive available, which vary between contractors, the choice of additives can be rather difficult. Additives are always required, but it is important that only necessary additives be used. Of all these additives, a corrosion inhibitor is the only one that should always be applied. Also, a sequestering agent, for the prevention of iron hydroxide precipitation is often required. Although proper fluid selection is critical to the success of a matrix treatment, the treatment may be a failure if the proper additives are not used. http://www.petrom.com 9-35 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING The most frequent additives used in OMV Petrom are: • Corrosion Inhibitors, • Surfactants (Emulsifiers, Deemulsifiers, Nonemulsifiers), • Clay Control/Stabilizers, • Fines-Fixing Agent (FFA), • Mutual Solvents, • Iron Control Agents, • Alcohols, • Anti-sludge Agents, • Friction Reducers, • Non-Emulsifiers, and • Foaming Agents. 9.4.3 Carbonate Acidizing Best Practices Fluid Selection for Carbonate Acidizing As the physics of carbonate matrix acidizing is complex and considering the complex nature of wormhole formation, a proper selection of the acidizing system and concentration is very important in the first step in designing carbonate acidizing. There is an optimum combination of acid (or reactive fluid) injection rate and degree of reactivity (or retardation) for each formation. The key criteria for proper acid system selection for carbonate acidizing are temperature, mineralogy and petrophysics/reservoir properties. The goal of proper acid system selection is to optimize of acid penetration and the structure of the newly created channels. Temperature strongly influences inhibition of the acid. At high temperature (150 oC), organic acid are preferred because they are less corrosive than HCl. Mineralogy refers to whether the carbonate formation is pure limestone or partially (or totally) dolomite. Greater than 20 % HCl must be avoided in dolomites due to the potential precipitation of by-product. In case where silicates (quartz, feldspars or clays) content in the dolomite is high (up to 50%, as shown in Figure 9-19 then the HCl should be inhibited with HF. Figure 9-19 Impure dolomite: Quartz grains (white crystals) scattered in the dolomitic matrix (brown crystals of dolomite) When the insoluble minerals are class or fines, dissolution of the rock matrix will result in the release of insoluble fines and a special blend of 7.5% - 15% inhibited acid special clay dispersing, suspending and chelating agents should be applied. In dolomite carbonate formations containing anhydrate 9-36 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 9. STIMULATION BY ACIDIZING (anhydrous calcium sulfate), anhydrite will first dissolve in HCl but gypsum (hydrated calcium sulfate) will quickly reprecipitate because of its low solubility. In such formations, the best practice is to use an acid system with good chelating properties in order to minimize problems (inhibited blend of HCl with good chelating properties or non-acid system with chelating and clay suspending agents). Diversion is required to improve fluid placement. Apart from small treatments to remove nearwellbore damage, for which neat HCl acid (with necessary additives) can be used, (lightly) gelled acid is used in most carbonate matrix treatments. This is done to improve zonal coverage of the acid, to retard the acid reaction rate, or to improve its fines-suspending properties. Some relevant aspects of the various acid systems are discussed below. Petrophysics/Reservoir Properties such as distribution, type of porosity and reservoir permeability have a strong influence on the extent of the damage and on penetration of acid. Reservoirs with high permeability (K>50 mD) can be severely damaged by the invasion of solid particles and inhibited HCl with HF intensifier or emulsified HCl acid (70% of HCl and 30% of oil/diesel) can be used to remove damage. In naturally fractured carbonate formations, damage by solid particles occurs in the fracture. A proper acid treatment fluid enlarges the fractures and allows clean-up of the fracture network. An inhibited blend of HCl with good chelating properties could be an appropriate solution for this application due to its good suspending properties. Lightly gelled acids – various strengths of HCl with low concentrations of gellant (< 0.5%) for friction reduction. Gelling provides a viscosity of 1-3 cp at ambient temperatures. These systems are applicable for high-rate matrix treatments. Gelled acid systems – various strengths of HCl with higher concentrations of acid gelling agents (23%) to provide higher viscosity. These might range from 30 to 40 cp at ambient temperatures, resulting in an enhanced zonal coverage and reduced fluid loss. Systems that contain HCl, a gelling agent and a pH-sensitive crosslinker are called “in-situ crosslinked acid”. These are marketed as Zonal Coverage Acid (ZCA) by Halliburton and Self-Gelling Acid Diverter (SGAD), by Schlumberger. After crosslinking at a pH of 2-3, the gel will break upon further spending of the acid at pH values above 4. The systems can be built to work in HCl acid at strengths from 5-28% acid. The self-gelling acid system is particularly suited for treatments in horizontal wells. Emulsified acid systems – oil outside phase acid systems have been successfully used in situations where a retarded reaction rate is needed to create deeper acid penetration and wormholes. Because of their retarded nature, they can be pumped at low rates, which is beneficial in heterogeneous formations. Also their high viscosities result in better zonal coverage. Energized and foamed acid systems – in reservoirs where the reservoir energy is low, some form of additional energy may assist in the unloading of the fluids introduced into the formation. The physics of matrix carbonate acidizing is more complicated than in sandstone because of the wormholing phenomena. Development of a simplified workflow that could cover all possible variations is difficult and the proposed workflow is intended as an initial guide. Best practice is that fluid selection for carbonate acidizing is be made for each individual treatment. In general, the fluid that gives the deepest penetration for the expected pumping and reservoir conditions is the fluid that should be used. Selection of a base acid in an integrated approach requires consideration of some of the key parameters (permeability, type of carbonate ,Fe content, bottomhole temperature in relation to corrosion and reactivity of the formation) influencing on physics and chemistry of carbonate matrix acidizing, as shown on Figure 9-20. http://www.petrom.com 9-37 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 9. STIMULATION BY ACIDIZING Carbonate Acidizing Fluid Selection Workflow Figure 9-20 Fluid selection workflow for carbonate acidizing 9-38 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 9. STIMULATION BY ACIDIZING Design procedure for Carbonate Acidizing For a carbonate matrix stimulation treatment to be successful, it is important to acidize under conditions that will lead to the formation of deep penetrating wormholes that bypass formation damage, whilst using minimal acid volumes at optimal injection rates. Results from studies on efficient wormhole formation indicate that the injection rate should be increased, or the overall dissolution rate decreased (by changing the fluid type) as the depth of penetration increases. If such detailed planning is not feasible, then it is recommended to pump acid at the highest possible rate and pressure, whilst staying below fracturing conditions. Table 9-15 shows a schematic of dissolution as a function of surface reaction and diffusion rate as well as of acid injection rate. Table 9-15 Wormhole structure Common sequences for performing carbonate matrix acidizing are: 1. Pickling of the injection string, 2. Preflush, 3. Main Treatment, and 4. Overflush. Pickling The injection string usually should be picked prior to pumping of acid. The best practice for pickling injection string in OMV Petrom is to use acid of 5-15% HCl containing an iron control agent and a corrosion inhibitor. If there are some organic deposits in the injection string then pickling of injection string can be done with acid and an aromatic solvent and surfactant. Preflush If there are organic deposits (such as paraffins and asphaltenes with high molecular weight) in the wellbore tubular and near-wellbore zone then a carbonate preflush with an solvents (xylene or another) should be applied to remove organic deposits. In a limited number of cases in OMV Petrom, the preflush also served to displace oil from the near-wellbore and to prevent the formation of emulsion or sludge. Mutual solvents such as EGMBE (ethyleneglycol monobutylether) or others that are in liquid state and are water-and oil-miscible should be used. The common practice in the gas wells is to use various surfactants (anionic, cationic, nonionic, amphoteric) up to a maximum concentration of 1.5% in order to reduce the surface tension between acid solution and gas. Main Treatment The main treatment stage is commonly performed with 15% - 28% HCl. Selection of the treatment volumes depends upon the anticipated depth of damage and reservoir porosity. The recommended volume of treatment fluid varies within a broad range (120—3700 lit/m) whereas most treatments http://www.petrom.com 9-39 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING involve volumes is in the range of 310-1850 lit/m. The radius of acid penetration can be estimated using formation porosity and the injected volume of acid. The penetration of acid in carbonate formations is not uniform due to the heterogeneous nature of the depth of acid penetration and the required fluid volume has to be estimated by matching numerical model and laboratory test results. Overflush The purpose of the overflush is to displace the acid. Fresh water (additivated with NH4Cl) is the most common overflush fluid. Filtered crude oil and diesel may also be used in oil wells but are not preferable because of possible incompatibilities with acid. Nitrogen gas is an effective overflush, especially in gas wells. Diversion Techniques for carbonate acidizing Successful matrix treatments require uniform vertical distribution of the treating fluid. Improper placement exacerbates heterogeneity, as shown in Figure 9-21. Good placement is particularly difficult in carbonates because acid can bypass damage relatively easily. This damage bypass can result in negative skins, thus any pathway that preferentially attracts acid to begin with (such as natural fractures, high permeability thief zones, or depleted zones) will become an even stronger sink for acid as that zone becomes highly stimulated. Moreover, in wells with long openhole intervals, spending of acid along the wellbore will partially spend the acid that reaches the extremes of the openhole section, thus, jeopardizing the objective of achieving good zone coverage with acid. Figure 9-21 Improper acid placement in carbonate formation In carbonate reservoirs, in principle, two main diversion techniques (mechanical and chemical) can be used to improve fluid placement. • • Mechanical Packers, Ballsealers (Not used in OMV Petrom), Coiled tubing. Chemical Chemical diverters (insoluble in acid but soluble in oil, in powder state-benzoic acid, rock salt, polymer systems, … ). Foam diversion (foam agent with acid foamed with nitrogen). Self-diverting acid (chemicals which transform into gel in the consumed acid solution, thus preventing the channeling of acid in layers with maximum permeability). In situ-crosslinked acid (Not used in OMV Petrom) The technique is often applied in conjunction with coiled tubing and specific for carbonate formations. It consists of bullheading stages of HCl acid alternated with in-situ crosslinked diverter stages. During such treatments, pump rates should be kept at a maximum, but below fracturing values. The combination of CT, for accurate placement, and in-situ crosslinked acid, for diversion, has also been successfully applied in carbonate formations. Retarded HCl (by gelling or emulsifying the acid), or organic acids (At high bottomhole temperatures). 9-40 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 9. STIMULATION BY ACIDIZING Problems during and after acidizing in sandstone and carbonate The use of acid in sandstones and carbonates could result in various potential problems. The results of statistical analysis (Paccaloni) of more than 650 stimulation jobs in various type of formation (sandstone, poorly consolidated sands and carbonates) performed in wild cat, appraisal, development and injection wells (water and gas) are summarized in Table 9-16. Table 9-16 Statistical analysis of well-documented matrix stimulation treatments Well Status Wildcat Appraisal and development Water injection wells Formation Sandstone Limestone and dolomite Poorly consolidated sand Sandstone Limestone and dolomite Poorly consolidated sand Sandstone Limestone and dolomite Total: Matrix stimulation Documented failure 56 10 Apparent success ratio (%) 82 140 13 91 32 7 78 120 18 85 216 21 91 15 3 80 50 8 82 33 3 91 662 82 88 Table 9-17 shows the main reasons for the failures. The table shows that 73% of the failures were due to incorrect field stimulation procedures, whereas 27% were attributed to poor selection of stimulation-fluid types, volumes, additives, and sequences. This means that priority must be given to improved job supervision, real-time evaluation, and on-site quality control. Table 9-17 Main Reasons for failures Reason Failures Failure % Incorrect field procedures 60 73 Wrong stimulation fluid 22 27 Total: 82 100 Table 9-18 gives the reasons for failure for wildcat, development, and water (or gas) injection wells in sandstones, carbonates and corrective actions done to improve poor results of the 1st acidizing job. In the most cases, the second successful stimulations were designed and supervised by stimulation experts. Bullheading the Stimulation Fluids Bullheading the stimulation fluids, often leaving mud below the packer, was the most common reason for failures. The use of coiled tubing for downhole cleaning and circulation of the acid mixture to cover all perforations resulted in success in wildcat wells, development wells and water injection http://www.petrom.com 9-41 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 9. STIMULATION BY ACIDIZING wells. The use of coiled tubing in conjunction with matrix stimulations is recommended whenever technically feasible. To avoid pump-rate limitations owing to fluid friction pressure, the fluid could be pumped down simultaneously through the tubing/CT annulus and the coiled tubing, joined at surface with a Y-connection. Table 9-18 Reasons for failures and corrective actions Reasons (R) for Failure of Matrix Acidizing Treatment and Corrective Actions (CA) Done to Eliminate Poor Results of 1st Acidizing R Bullheading of stimulation fluids; mud left below packer R Bullheading of stimulation fluids CA Wellbore cleaned with coiled tubing CA Stimulation fluids circulated to cover all perforation and correct acid placement R 15% HCl preflush used CA Preflush avoided; 12% HCl/3%HF used R Injection pressure and rate too low CA Maximum Δp, maximum i (m3/s) technique used R Insufficient acid volumes used CA Corrected acid volumes used R Perforation breakdown not attempted; injectivity never obtained CA Formation initially fractured, then matrix conditions restored R Injection pressure too high (fracturing conditions) CA Job performed in matrix conditions R Use of wrong or not properly selected stimulation fluids CA Use correct stimulation fluids and fluid selection guide R Injection tests with heavy mud; injectivity with acid couldn’t obtained CA Formation was reperforated before the second acid job R Wrong sequence of stimulation fluids CA Redesigned sequence of stimulation fluids R Old strings not cleaned previously CA Pre-job cleaning with 15% HCl/Tubing Pickling R Coiled tubing not properly positioned CA Coiled tubing properly positioned R Circulation of stimulation fluids through tailpipe not properly performed CA Efficient acid contact with unstimulated zone R Ineffective chemical diverting agents CA Maximum Δp, maximum i (m3/s) technique used WC– Wild Cat Sandstone WC DEV/ AP X X X X X X X X X X Poorly Consolidated Sand Carbonate INJ X X WC DEV/ AP X X X X X X X X X X X INJ DEV/ AP INJ X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X DEV/AP - Development / Apprasial Wells INJ- Injection wells (water and gas) The second stimulations were successful because: (1) The postjob inflow either was significantly improved or was very close to ideal; (2) Postjob skin factors were remarkably reduced, most often down to 0 to 5 in sandstones and 2 to -5 in limestones; and (3) Dry tests in exploratory wells become continuously flowing tests. Because of these indications both the technical and economic objectives were achieved. 9-42 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 9. STIMULATION BY ACIDIZING Use of 15% HCl Preflush The use of 15% HCl preflush after dry tests in wildcats and in severely damaged development wells resulted in failures caused by total, permanent block of injectivity. The preflush subsequently was circulated out of the well, and the most efficient stimulation fluid (3% to 4% HF acid) was spotted directly in front of the perforations. The dry wildcat wells became discoveries, and the development wells had low final skin factors. The success rate of acidizing jobs have increased considerably by simply avoiding the use of HCl preflush after dry tests in wildcat wells. The mistake of using an HCl preflush in severely damaged wildcat wells is very common and has led to frequent erroneous statements of low (or no) production potential for the formations thus treated. The economic implications of such incorrect evaluations in exploratory wells are severe. The success rate can be increased by applying the following best practices with dry or partially flowing exploratory wells. 1. Avoid the use of HCL preflush. 2. Select the most effective stimulation fluid for the expected damage type (3% HF in most cases). 3. Design the simplest stimulation procedure; avoid stage treatments, diverting agents, chemical retarders, etc.; and include only corrosion inhibitors and an effective mutual solvent. 4. Establish a target injectivity index in matrix conditions. Once it is reached, flow the well back immediately. 5. Stop injection upon reaching the productivity target. As far as development wells are concerned, the severely damaged sandstones containing 5% to 15% carbonates first are treated with 0.124 to 0.248 m3/m of 3% HF solution to reduce the skin factor and to guarantee sufficient injectivity. The regular sequence (HCL preflush, HF treatment, and then overflush) follows immediately only if the target injectivity index (directly related to the target PI) was not reached. Insufficient Injection Pressure and Rate Insufficient bottomhole injection pressure (BHIP) caused several failures in thick, multilayered reservoirs whereby only a small part of the exposed pay was stimulated. Comparison of pre- and postjob pressure-buildup analyzes indicated a slight decrease in damage. Less than 20% to 40% of the total pay was producing after the stimulations, even in the two cases where chemical diverting agents were used. Accurate postjob evaluation indicated that only 150 to 373 kW was used instead of the required 1492 to 2238 kW. The stimulations (all in development wells) were repeated with the same stimulation fluids, but the "maximum Δp, maximum i" technique was used. The concept supporting this technique is that, at the maximum allowed BHIP (in matrix conditions), it is always possible to calculate a maximum injection rate resulting in the complete removal of damage (s=0) across the whole exposed pay. In the all analyzed cases, flow-meter surveys, combined with pressure-buildup analyzes, validated the effectiveness of the ”maximum Δp, maximum I” technique. The producing pay was 70% to 85% of the total perforated pay. Although diverting agents were never used, the final skin factors decreased from the initial 59 to 112 range to as low as 4 to 7. The total production increase obtained from second stimulations was 1908 m3/d oil; as compared with 143 m3/d oil after the first stimulations. The maximum injection rate (in matrix conditions) reached during the second stimulations was 2.86 m3/min, which is significantly higher than 0.3 m3/min used during the first stimulations. The real challenge in the stimulation of carbonate rocks is to remove/bypass damage from both primary and secondary porosity efficiently. The presence of natural fractures in the exposed pay causes a very high permeability contrast and insufficient injection pressure and rates cause very http://www.petrom.com 9-43 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING small portions of the exposed pay to produce or to take fluid. Using chemical diverters (benzoic acid) did not improve these results. Perforation Breakdown Not Attempted Several stimulations after dry tests in wildcat wells failed because a perforation breakdown was not attempted. The jobs were over after 1 or 2 hours of no injectivity, with 3% HF in front of the perforations. The previous dry drillstem tests were justified by a lack of permeability rather than severe formation damage. Because of the importance of the exploratory target, the two jobs were repeated and the fracture pressure was exceeded to clean the perforations and to obtain injectivity. Matrix conditions were then restored and damage was effectively removed. As a result, two important discoveries were claimed. Fracture Pressure Exceeded Failures also resulted from poor job supervision whereby the jobs were carried out in fracturing conditions until the end. No improvement in the production/injection inflow performance was observed in some cases while a deterioration of the production parameters (with postjob skin factors higher than pre-stimulation ones) was detected by pressure-buildup in the remaining two cases. The same fluids pumped in matrix conditions resulted in complete success when the stimulations were repeated (final skin factor ranging from one to four). Use Incorrect Stimulation Fluids. The wrong choice of stimulation fluids caused several documented failures. In one case, acetic acid, selected on the basis of laboratory tests on cores, caused the initial skin factor (+35) to double towards the end of the job. The stimulation was repeated with 3% HF, and the final skin was less than five. Another well initially produced 350 m3/d oil, but production declined over 6 months to only 64 m3/d oil. Production increased to 318 m3/d oil after reperforation, but declined with the some trend. An HF job was attempted, which again improved production for only a few months. This behavior suggested that formation damage was probably caused by migratory fines, and a different acid formulation, fluoboric acid (HBF4), that had been studied especially for stabilizing shaly fines was used. This well produced 302m3/d oil for 5 years after the HBF4 job. A water injection well was stimulated with an HCl preflush followed by HF to increase the very poor injectivity observed a few days after the well’s transformation from produced to injector. No improvement was obtained, and the skin factor remained as high as 62. A second stimulation was designed including a massive cushion of aromatic solvents as the first step in the same sequence of fluids used previously. This treatment removed the damage very efficiently; the final skin factor was 2.7, derived from pressure-falloff test interpretation. One-half of the recorded failures (5 out of 10) in poorly consolidated sands pertain to use of improperly tailored stimulation fluids, such as HCL/HF at various low concentrations (7.5% to 1.5%; 7.5% to 0.5%) or just 7% to 15% HCL. A careful laboratory investigations suggested the use of lowpower acids, such as EDTA (two cases) or formic acid (three cases). Matrix stimulations with these fluids allowed efficient damage removed, while fluids in previous jobs tended to cause more damage. Wrong Sequence of Stimulation Fluids Table 9-18 indicates that some failures of acidizing jobs in development wells were caused by incorrect type or sequence of stimulation fluids. The reservoirs were not over pressured and the formation fluids were heavy crudes, forming sludge and strong emulsions with HCL. Additives for 9-44 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 9. STIMULATION BY ACIDIZING preventing or minimizing these problems were used, but the jobs failed. The jobs were repeated, adding Steps 1 through 3 to the sequence and doubling the volume in Step 4. 1. 2. 3. 4. 5. 6. 7. Aromatic solvent was added to remove any damage caused by precipitated asphaltenes Nitrogen was added Diesel commingled with nitrogen was added. Diesel (twice the acid volume) was added. 28% HCl was added containing anti-sludge additives. Diesel was added (twice the string capacity). Nitrogen (string capacity) was added. The described procedure was successful where previous stimulations failed, and it has since been adopted for stimulating heavy oils in carbonate reservoir that are not overpressured. Obviously, Step 1 can be omitted if asphaltene deposits do not form part of the damage. A blend of alcohols has been used instead of diesel when some diesel/crude-oil incompatibility is detected. Incorrectly Positioned Coiled Tubing The documented failures in wildcat wells were caused by incorrect positioning of coiled tubing (above the top of the perforations rather than at the bottom, as planned). Both jobs with 28% HCl resulted in negligible improvement, yet surface production was not obtained. The importance of the exploratory targets made further attempts advisable. The stimulations were repeated with the same fluids, but more attention was given to the correct circulation of 28% HCl and the coiled tubing was positioned below the bottom perforations. Both wildcat wells produced spontaneously at economically significant production rates after the second stimulation. Incorrect Acid Circulation A tailpipe was sometimes used to circulate HCl in front of the perforation pay in deep wells with a high bottomhole static temperature (150oC). Before stimulation, the well produced around 50 m3/d oil with very high skin (s>200). Stimulation results were below expectations, and a residual skin factor of 45 was detected from a pressure-buildup interpretation. Careful analysis showed that circulation had been stopped prematurely and that the acid mixture did not come out of the tailpipe. This led to the conclusion that only the lower part of the perforated interval was contributing to production. The tailpipe was released mechanically and dropped into the rathole. A 28% HCl was then bullheaded to stimulate the upper part of the perforations. A second pressure-buildup interpretation provided a zero skin factor and production was almost ten times higher. 9.4.4 Planning and Job , Execution of Acidizing Treatment Matrix Acidizing Planning and Scheduling Planning, execution and evaluation of a stimulation treatment requires a significant amount of time, even in the case of routine jobs. Proper planning is the only way to achieve optimum results and structured improvements in job results (in case of field wide campaigns). Therefore, when starting stimulation campaigns, it is suggested to treat the first wells as one-off treatments and adjust subsequent treatments based on proper evaluation of these initial treatments (“pilot campaigns”). Planning should not only look at the execution (to be discussed in the next chapter), but should include sufficient time for design and evaluation. A time table for planning different phases of matrix acidizing stimulation is given below in Table 9-19 and shown in Figure 9-22. http://www.petrom.com 9-45 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING Table 9-19 Matrix Acidizing Planning Schedule Figure 9-22 Matrix Acidizing Planning Schedule The above table and chart have been made with a number of assumptions: • • • Direct availability of stimulation contractors, specifically in the case of one-off jobs. All times indicated refer to the time required for an individual well. Proper planning for a field campaign may require up to one year including laboratory testing, depending on the situation. Usually, tendering is done for a complete campaign, hence the time per well can be very short. One or more stimulation contractors are active in the area; otherwise considerably longer time for arranging equipment and materials is required. Once the contractor has been selected, work should start to determine logistics and to finalize designs. Finalisation of designs can be completed once all laboratory testing is completed and the well parameters are known. In practice, it is rarely possible to determine the exact design until a very 9-46 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 9. STIMULATION BY ACIDIZING short time before the treatment is carried out. As soon as the contract has been awarded, a meeting should be held with the contractor to outline the location, the timing, the well configuration, the fluid pumping schedule, the on-site quality control and other operational aspects or problems that may exist. Any special or unusual aspects should be discussed the onset to allow the contractor sufficient time to prepare for the treatment. The more time that is allowed for preparation, the more it will be ensured that all specifications of fluids and equipment can be met to successfully perform the treatment. One Petrom OMV representative is assigned as project coordinator, who will have the authority to liaise both technically and operationally with the contractor. The contractor should also appoint a project coordinator who will liaise with the operator and will act as coordinator within the contractor’s organization to ensure that the specifications of the treatment are met. The more lead time available to the contractor, the more thoroughly the contractor will be able to consider all possibilities regarding the stimulation treatment. Site preparation Just prior to the treatment, the wellsite needs to be prepared for the treatment. The equipment of the stimulation company has to be rigged up. In many cases, “third party” equipment also needs to be on location, such as logging tools, wireline rig, coiled tubing unit, etc. The various stimulation equipment should be rigged up such that other equipment can easily be installed as required. If a service rig is on location, equipment should be spotted out of the fall line of the rig mast. Care should also be taken to the placement of the high-pressure pumping equipment, where personnel will not be exposed to the fluid end of the pump. If equipment for N2 or CO2 is on location, it should be spotted at least 20 m from other equipment and the wellhead. Matrix Acidizing Job Execution Successful job execution depends on good planning, preparation, supervision, and attention to details, quality control, and communication. It is well worth the cost to select well-trained, dedicated personnel, well-maintained equipment, well organized crew and good-quality materials. A lack of one of these prerequisites will often result in an unsatisfactory stimulation job and therefore a lower return on investment, even though the costs of a poorly executed treatment may be substantially lower. The most common process in matrix treatments is for the fluids to be preblended at the service company facility, and then transported to the location. This allows blending small volumes accurately, controlling environmental hazards. The fluids are then pumped with little effort or quality risk. The operator should carry out regular quality control checks at the service company facility. Wellbore preparation is especially critical for acid treatments. When key steps of preparing the wellbore for the acidizing process are left out (e.g. not pickling the tubing, not removing the gas lift valves, not removing the rods or an electrical submersible pump), the prospects for ultimate success are reduced. Injection of tubular debris into the formation can be disastrous and rust and mill scale must be removed, even with new pipe. In this connection the best practice always involves an acid pickling job of tubing prior to carrying out the acid stimulation job. This can be done by simply spotting 15-20% HCl down the tubing and up the annulus. When executing a mud acid treatment in sandstones, significant changes in the flow distribution of the injected fluids may occur during the treatment as pore-plugging materials are dissolved. Because the acid does not follow the ideal mode, adjustments to the injection volumes must then often be made. Significant changes in the fluid can also occur in the tubulars, before the fluid reaches the formation. The dilution of stage composition and spending are just some of the complications that must be addressed by the designer. The use of smaller tubulars, such as coiled tubing, especially during acid treatments in horizontal wells, can contribute to a better acid job by facilitating the maintenance of stage integrity and reducing displacement volumes. Mechanical limitations associated with artificial lift (e.g. gas lift) are more easily overcome by the use of coiled tubing. The http://www.petrom.com 9-47 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING risks of leaking valves, undiluted acid remaining in the mandrels and acid leaking into the tubing/casing annulus are thus avoided. The limited injection rate coincidentally controls the contact time. However, the pump rate and extraction out of the tanks holding the acid can create a bottleneck during execution. A complete understanding of these operational aspects is necessary for proper execution. At the end of a matrix treatment in carbonate formations, the acid should be flushed into the formation with water (or KCl or NH4Cl brine if the formation contains swellable clays), and the well can be immediately returned to production. For sandstones, where HF systems have been used, to minimize the impact of precipitation, it is mandatory that an afterflush be employed and that the well is returned to production immediately. The afterflush can be diesel oil, nitrogen, HCl, or ammonium chloride brine, and its use will tend to ensure that precipitation from spent acid solutions is prevented, or will occur away from the critical region very near to the wellbore. The additives used in acid systems, such as corrosion inhibitors, mutual solvents, clay stabilizers, etc., are water soluble or at least water dispersible. This characteristic maximizes the efficiency of the acid. However, since consumption of these additives in the formation cannot be quantified accurately, many of the additives are added in excess, to assure an adequate concentration is present in the formation to function effectively. Consequently, a significant amount of the additives that are injected, are produced back with the water phase and they show up in the oil/water separation system, where they can cause system upsets (i.e. emulsions) and often result in downtime for the individual well, as well as the entire production installation. Delays in returning the stimulated well to production have reduced the stimulation effectiveness. Furthermore, environmental compliance on permitted produced water overboard discharge locations, has been difficult to attain in such cases. Preventing disturbance in the functioning of the system requires optimizing the fluid design to minimize or eliminate the formation of precipitates or micro emulsions. The evaluation of the optimal demulsifier is critical due to the potential for emulsion formation by the aqueous phase of the acid stimulation and is described in API RP 42 (1977). Apart from proper demulsifier selection and use of acid additives, separate facilities for isolating flow returns from the normal dehydration train could also be used for minimizing facility processing disturbances, as well as filtration of the produced fluids through specially designed media. 9.4.5 Job Evaluation and Control The Company Assigned Representative (CAR) prepares the matrix acidizing stimulation activity reports, to be communicated to the appropriate office, including the treatment report. To facilitate a proper evaluation and ensure the proper feedback into subsequent treatments, it is absolutely essential to produce high quality stimulation treatment reports. The treatment report must incorporate fluid QC data, pump rates, tubing and annular pressure measurements and clearly identify which fluid or diverter was pumped, together with cumulative volumes. It is essential that the report also identifies all deviations from the program, pumping interruptions and equipment problems which influenced, directly or indirectly, the treatment operation. Matrix Acidizing Control Real Time Skin Evaluation In recent years, technology to determine real-time skin effect evolution during a treatment has been developed. Although this technology is not practiced routinely, it can be a useful diagnostic tool. For example, if the skin effect is decreasing during an HCl stage, an acid-soluble species (e.g. calcium carbonate/oxide, iron carbonate/oxide) created the damage. This information should be complemented by the well history and laboratory testing to improve the understanding of the causes of the present problem and assist future work. 9-48 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 9. STIMULATION BY ACIDIZING The use of reliable methods for real-time control, and post-stimulation evaluation allowed stimulation specialists to recognize the failed jobs, to identify the reasons for the failures, to optimize the stimulation design, and to achieve a very high success rate. The evaluation method used to record formation response to stimulation fluids is the Field --Acid Response Curve (FARC) proposed by Paccaloni (ref). The developed technique is based on the use of a steady-state equation of radial flow. The model has proved to be easy, fast, and simple enough to be used and appreciated by field personnel. Field supervisors can make better decisions on how to manage treatment jobs by using FARC during these jobs. Real time management of acidizing jobs depends heavily on an accurate knowledge of reservoir parameters. The absence of such data during matrix stimulation jobs, makes injectivity tests before treatment necessary in order to estimate starting reservoir permeability and skin factor. The linear nature of the „Pacalloni“ curves in the prediction diagram shown in Figure 9-23 can be used for this purpose. These curves illustrate the relationship between injection pressure and rate for various skin factors and an assumed permeability (K) and reservoir thickness (h). The apparent skin is then plotted on the type curves at several injection rates below the fracturing pressure, i.e. within Darcy low radial flow regime. The calculated skin values, S(t) using Eq.9-8 at various injection rates are then compared, and Kh is changed until a reasonable fit is achieved (marked in red ( ), as shown in Figure 9-23. If fit gives low skin factor, then the well is a poor stimulation candidate. In the example shown in the Figure below, the estimated skin factor after matching with injection data is 90.8. This value is used further for calculating Field Acid Response Curve (FARC), i.e., change of skin factor during acidizing job. S(t ) = ( pi( t ) - p R + p h - p fr ) k w h 26879.6 i( t ) µ w - ln r b rw (9-8) Figure 9-23 Evaluation of matrix stimulation using prediction diagram and injection test The obtained fit also gives a starting point for tracking the skin values over time according to equation 9-8, using acid injection data marked in green in Figure 9-23( ) which essentially represent FARC, as shown in Figure 9-24. To obtain FARC it is required to know the bottom hole pressure (BHP) which can be calculated by using algorithms for calculating pressure drop due to friction and the properties of the acid (density). The supervisor of an acidizing treatment job, having FARC curve, as shown on figure above, could make decision to stop injection before the planned volume of treatment fluid was injected. http://www.petrom.com 9-49 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING Figure 9-24 Field Acid Response Curve In another case (Figure 9-25 – Acid Injection Data vs. time and Figure 9-26 FARC), the formation clearly did not respond to the treatment as expected. The initial skin factor value of 20 increased as the acid was injected to the value of 70 at the end of the job. The wrong acid recipe was used and a 2nd job must be performed with another type of treatment fluid. Figure 9-25 Injection rate and pressure during job in Well 2 Figure 9-26 Field Acid Response Curve 9-50 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 9. STIMULATION BY ACIDIZING The general workflow for real time monitoring and control of matrix acidizing is shown in Figure 9-27. Figure 9-27 Workflow of matrix acidizing control in real time Post-treatment Data Evaluation and Control Careful recording should be made while bringing a well on production following stimulation. Early indications of success can be found in the ease of initiating production and higher flow rates and flowing tubing head pressures. Early production problems may indicate an incompatibility between treating fluids and the produced oil. Flowback fluid samples should be acquired, regardless of the volume of the treatment. These samples should be marked, with the date and time, total volume recovered to that point and other pertinent data, such as choke size, flowing tubing pressure, water cut and produced quantities. The analysis of water samples may indicate problems with the treating fluid selection (e.g. precipitation problems with HF acidizing). Monitoring the ionic content of http://www.petrom.com 9-51 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING returned fluids following acidizing treatments can provide insight into the actual chemical acidspending processes downhole. The mass balance of the injected and returned fluids and the relative percentage of silicate reprecipitation allow the determination of relative spending levels of various acids on the formation and well scale. Stimulated wells should be subjected to pressure buildup and pressure transient analysis following a treatment. These data are the basis for a quantitative assessment of the well and reservoir characteristics. Comparison of these results to pre-treatment buildups can provide the best assessment of the success of the stimulation treatment. Ultimately, a treatment should be evaluated on the basis of the well performance and economic parameters to justify the treatment. 9.5 Configuration of Surface Equipment for Acidizing The equipment needed for matrix treatments is, in general, relatively simple. The main items required are: • Storage vessels for acids, solvents, etc. • Low-pressure suction lines and manifold. • Blending equipment for “on-the-fly” addition of additives, such as surfactants, use of high-pressure pump units, at least one more unit than is strictly required for the treatment (based on horsepower requirements). • High-pressure line to the wellhead. • Adequate measurement and control equipment, such as pressure sensors, flow meters, densitometers, recording equipment, etc. • Waste disposal tank(s) or similar facilities (see also chapter 9.8.2 with environmental aspects). Figure 9-28 is a schematic for typical equipment layout for a matrix acidizing stimulation treatment Figure 9-28 Typical Surface Equipment Layout for Standard Matrix Acidizing without using foam 9-52 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 9. STIMULATION BY ACIDIZING In case the acidizing job will be performed with foamed acid (with N2 or CO2) the equipment which has been utilized in OMV Petrom is shown in Figure 9-29. The main component that needs to be added as compared with the typical equipment layout is a nitrogen converter. Figure 9-29 Typical Surface Equipment Layout for Matrix Acidizing with Foamed Acid 9.6 Fluids and Materials Used for Acidizing 9.6.1 Additives (corrosion inhibitors, Iron-Control Agents, Clay Stabilizers etc) Corrosion Inhibitors Acid corrosion inhibitors reduce the corrosion of well tubulars by acids. They adsorb on the surface of the pipes to form a protective film, thus reducing the reaction rate of acid with steel. As with any chemical reaction, the corrosion rate increases rapidly with temperature: each 10 °C increase in temperature will increase the corrosion rate by a factor 2 to 3. Moreover, corrosion inhibitors lose their effectiveness at higher temperatures, causing an extra increase in corrosion rate above 100 to 150 °C. Corrosion inhibitors can give adequate protection to temperatures up to approximately 100 °C and Table 9-20 shows the temperature limits for efficient application of some corrosion inhibitors. For protection at higher temperatures, as shown in Table 9-20 below, salts with reducing properties (cupro-iodide/sulfate, potassium iodide, etc.) are added as intensifiers. Table 9-20 Temperature limits for corrosion inhibitors http://www.petrom.com 9-53 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING The main factors affecting corrosion are metallurgy, acid type and concentration, agitation, temperature, pressure, inhibitor solubility and concentration— i.e. the ratio of metal area to acid volume — contact time, presence of inhibitor aids and the influence of other additives. Chemical providers gives recommendations for their particular product, as shown in Appendix 9-B. Surfactants Surfactants, or surface active agents, are chemical containing both oil and water soluble groups, as shown in Figure 9-30, with the ability to alter liquid-liquid or gas-liquid interfacial properties. The reasons for using surfactants in acidizing are to: • Reduce surface and /or interfacial tension and capillary forces, • Alter and/control wettability, • Break undesirable emulsions, • Speed cleanup, • Disperse additives, • Disperse/suspend fines • Prevent sludge formation, and • Prevent/break water blocks. The use of surfactants requires careful selection of an appropriate molecule. Remarkably, in the design of most well treatments, surfactants are selected with little or no laboratory data to support the choice and sometimes without full knowledge of their properties at the conditions where they will be applied. Figure 9-30 Dipolar surfactant composition 9.7 Quality and Safety Requirements for Acidizing 9.7.1 Quality Control Incorporation of Quality Control (QC) measures during all aspects of an acid job can make the difference between success and failure. QC is the process of ensuring that the materials and equipment meet specifications and are delivered in proper condition to the well-site. The execution of matrix acidizing must be performed as specified in the treatment schedule or by the operator on location. During this process, QC and data collection is important. The operational objective is defined by the design. 9-54 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 9. STIMULATION BY ACIDIZING Quality control monitoring only during the actual pumping of the treatment is not sufficient. In addition, quality control steps must be planned and executed during rig-up of equipment, before pumping, and after pumping. Laboratory check The laboratory testing is to be carried out in the field prior to, and during the treatment. Although perhaps more difficult because of poorer working conditions, it is most important to ensure that the fluids prepared on location and pumped into the well, have similar properties to the fluids selected on the basis of the initial laboratory tests and to the parameters used in the design. Failure to carry out those quality control checks will almost certainly result in the treatment not being pumped exactly as designed. These tests should be performed on samples of the chemicals supplied to the field. This will initially certify that each individual material meets the specifications laid down and will pass the final quality control check. After each material has been tested individually, they should then be tested as acollective fluid using location water. Field testing will identify any incompatibilities due to contamination. For matrix stimulation operations, useful QC measures include: • During rig-up of equipment: o It is mandatory to inspect all tanks that will be used to hold acid or water. The tanks must be clean. Small amounts of dirt, mud, or other debris can easily ruin an acid job. o Make sure the service company has the equipment to circulate the acid tank prior to pumping. o The line to the pit or tank should be laid and ready to connect to the wellhead so the acid can be back-flowed immediately after the end of the overftush. o Calibration of all measuring devices, such as transducers and flowmeters, should be a regular part of maintenance procedures. Calibration conditions should mimic operating conditions to the extent required to properly calibrate the equipment. Sufficient inventories of spare parts should be available to make maintenance repairs quickly. Calibration tests should be conducted routinely and the results documented. • Quality control before pumping o Check the service company tickets to be sure all additives for the job an on location. It is important to make sure that additives included in the treatment design are included among the chemical components delivered for on-site mixture and use. Not only do additives once in a while fail to show up, sometimes an incorrect additive, or at least an unacceptable substitute, may be delivered instead of what had been requested or specified. o Circulate the acid storage tank(s) just before the acid is injected into the well. It is known that certain additives, particularly corrosion inhibitor, can settle to the top of the acid tank, leaving the body of acid inadequately inhibited. It is important to mix acid on delivery—and if possible, continuously, up to injection. If that is not possible, then acid should be mixed immediately prior to injection. o On-site titration of acids to verify the concentration. o Verification that surface-active agents are supplied in the specified concentration. It is important to stay below the maximum surface pressure during injection, for consideration of equipment safety limits. Also, in sandstones, it is necessary to stay below fracturing pressure. It may be that changes need to be made as the treatment is being pumped. If any changes are in order, they must be well understood by all personnel beforehand and during treatment, while they are made. o Regular QC testing of each batch or lot of corrosion inhibitor by the service company o On-site testing of gel viscosity for diverters (carbonates) http://www.petrom.com 9-55 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING Make sure the service company personnel know the maximum surface pressure and stay below that pressure. o Check the pressure-time recorder or any other on-site treatment monitoring or evaluation mechanism, to ensure proper operation. o Acid-clean (pickle) the tubing. If the tubing is not pickled, debris, iron scale, pipe dope, and other solids can be injected into the formation at the very beginning of an acid treatment. This can irreparably damage the near-wellbore formation, ruining an otherwise well-designed treatment. If possible, always include a pickling pretreatment. o 9-56 • Quality control during pumping o Control injection rate, maintain surface annulus pressure at or below certain level (30-35 bars) during treatment and monitor the pressure response when acid reaches the formation. The surface pressure should slowly decrease if the rate is held constant, indicating skin removal. If the surface pressure rises sharply or rises continuously for certain volume of acid (0.5-1m3), the acid may not be removing the damage or maybe damaging the formation. Acid injection should be stopped, and the well should be flowed back immediately, no matter what objections there may be. Samples of the back-flowed acid should be sent to the service company laboratory for analysis o Sampling of fluids pumped during the stimulation treatment, with samples retained until the treatment has been evaluated. o Regular testing of particle size and solubility of particulate diverters o Note the pressure response when the diverting agent reaches the formation. The surface pressure should rise slightly, if there is no diverter response, more diverter or a different diverter may be needed in the future. If diverter response is not noted, the injection rate may be increased, if the pressure limit permits, to enhance zone coverage. This should be considered only if it does not compromise other aspects of the design. o Never exceed the breakdown pressure of the formation in a sandstone acidizing treatment, unless absolutely necessary initially to break down the perforations (with a perforation -wash tool) or to bypass severe damage to initiate inactivity. Once fracture pressure was exceeded, injection pressure remained virtually unchanged, suggesting an absence of effective diversion and zone coverage. o In the final flush, make sure acid is displaced from the wellbore. The full overflush should be pumped as designed. Spent acid, especially in sandstone, must be sufficiently displaced from the wellbore to reduce the damaging effects of precipitation of acid reaction products. In carbonate stimulation, it is desirable for acid to be fully spent before it flows back, to avoid possible corrosion problems on flowback of return fluids. • Quality control after pumping o Do not shut the well in after acid injection. Flow the well back to the tank or pit as soon as the flow line is connected. Flowback immediately following acidizing is not normal production, and if care is not taken, severe damage can be caused during this initial period. Three of the most common problems during flowback are: Fines migration (to avoid potentially damaging effects, the flow rate should be set low at first. Then, after spent acid is produced back, the flow rate should be gradually stepped up to planned production conditions). Re-precipitation of acid reaction products (In sandstone acidizing, the only way to minimize the problem once the acid treatment has been pumped is to return the well to production as soon as possible. The process of flowing http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 9. STIMULATION BY ACIDIZING o o o spent acid back must be initiated immediately. Shutting the well in an HF treatment is the worst course of action, with respect to damage caused by reprecipitation of HF reaction products). Back-production and processing of additives (most additives included in acid mixtures are produced back after treatment. They can cause upsets to production equipment and facilities. Depending on the circumstances, spent acid must be collected and properly disposed of). Collect at least three one-quart samples of back-flowed acid for analysis. Sample the acid back-flow at the beginning, middle, and near the end of the flow. If on swab, get a sample from every other swab run. This information can indicate the nature of acid spending, whether overtreatment or undertreatment occurred, and whether iron and potential precipitation of reaction products are a concern. It also can indicate if acid mixtures injected might have been incompatible with formation fluids. It is imperative to patiently evaluate return samples before drawing any potentially incorrect conclusions about the treatment pumped. If possible, get a laboratory analysis for the following: Amount, size, and type of solids, Strength of returned acid, Total iron content, Presence of emulsions and/or sludges, and Formation of any precipitates (besides iron). A complete analysis of acid returns, using spectroscopic methods can be performed by specialized laboratories. Concentrations of the following ions should be determined: Aluminum (Al3+), Magnesium (Mg2+), Chloride (Cl-), Barium (Ba2+), Potassium (K+),Fluoride ion (F-), Calcium (Ca 2+), Sodium (Na+), Iron (Fe2+, Fe3+) and Silicon (Si2+, Si4+). Spectroscopic analysis can indicate on what the acid stages spent themselves and whether the spent acid stages produced back in the expected and desired manner. This information can be important for designing future treatments in the same field. For example, perhaps spent HF returns in a sandstone acidizing treatment showed high Ca2+content. This might indicate the need for a larger acid (HCl) preflush. Alternatively, it might indicate the need to back off on the HF stage. High Si/Al ratios suggest reprecipitation of aluminum fluoride salts, indicating that the designed HCl/HF ratio should be modified. Other potential modifications include lowering the HF concentration and using a special HF system designed to minimize the reprecipitation of such reaction products. Take the treatment report and the pressure charts to the office for evaluation and placement into the well file. Both the operator and the service company must make an effort to exchange and discuss all relevant treatment information, to give each other the best chance for future success. 9.7.2 Health, Safety and Environmental Aspects of Acidizing In any well operation, including acid stimulation, safety must be designated as a crucial quality control measure and job safety is of utmost importance. Awareness of the importance of health, safety and environmental, (HSE), issues has become more and more central to the thinking of the E&P industry and regulators in the last decades. The implementation of HSE management systems (HSE-MS) of Petrom OMV and Service providers to control these aspects in acidizing operations are no exception. Accomplishing successful well acidizing is of high importance, but, all is greatly diminished in importance when compared to safety concerns. http://www.petrom.com 9-57 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING HSE Aspects of Acidizing The pre-job safety meeting is the most important part of the treatment. In this meeting, all safety considerations should be discussed in detail. The main purpose of the meeting is to ensure that each individual present at the job site knows his or her responsibility and what to do at all time during the job. The following topics should at least be covered during this meeting: • • • • • • • • • • • • • • • • Job details and contingency procedures (sudden leaks, etc.). Chemical hazards, i.e. actions required if hazardous contact occurs. Required protective clothing, goggles, gloves, etc. for working with the chemicals on location. Applicable smoking, drinking and food limitations. Sampling procedures. Communication lines between contractor and OMV Petrom personnel (all individuals present should be familiar with the service company's mode of communication. Service company representatives should report their means of communication to the OMV Petrom company representative during the treatment. They should plan appropriate action to take if that line of communication fails. Maximum allowable treating pressure. Responsibilities of each individual on location. Do a complete head count of all personnel on location? It is best practice for the leads to have an idea of where everyone is at all times? Personnel should inform the leads of their whereabouts when leaving the site temporarily. Check if the place of a fire extinguisher on the ground is easy for access. Check if reserve a vehicle is ready for transporting eventually injured personnel in the case of catastrophic event. Give two individuals the responsibility of transporting eventually injured persons to the nearest clinic/hospital. Gathering area in case of emergencies/disasters. Disaster, such as an explosion or a major equipment failure or leak, may require evacuation to a safe area. By contrast, in the event of an accident, the gathering area may be more immediately accessible. Location of First Aid facilities and first aider in charge. Materials Safety Data Sheet (MSDS). Basic information on the nature of chemicals handled, precautions to be taken and actions to be taken in the event of a fire, spillage or accidental contact should be available at locations where chemicals are handled and also at first aid stations. Safe Handling of Chemicals (SHOC) instructions should be on site. As to safe handling of chemicals (SHOC), especially in matrix treatments, whenever in doubt, the manufacturer’s instructions should be consulted for advice on the handling of chemicals. In general, precautions should be taken to avoid skin contact and inhalation and, in any event where contact is possible: o o o o • 9-58 Hands should be washed before eating, smoking or using the toilet, food should be consumed in areas free from dust and fumes, Contaminated clothing should be removed before eating. Personnel handling acid or caustic substances should wear gloves, boots, face shields and acid/alkali resistant coveralls or aprons. During all stimulation jobs, there is a risk of splashing or contact with dangerous chemicals. Therefore an emergency shower and/or eye wash facility should be installed within 20 meters. Rest area. http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 9. STIMULATION BY ACIDIZING General HSE guidelines for acidizing A stimulation treatment involves the handling, injection and back production of potentially hazardous chemicals and during the operation high injection pressure will be needed. Therefore, the strict and precise HSE requirements must be followed and applied. To ensure a safe and environmentally acceptable execution of a stimulation treatment, the following rules apply: • • • • • • • • • Design the treatment with chemicals which have the smallest possible environmental impact. Make sure that for each chemical used, a instructions and a Material Safety Data Sheet (MSDS) are available on site. For critical jobs, or with new, relatively inexperienced crews, hold dry runs on critical operations. Pressure tests all lines prior to the treatment. Determine the position of all valves and sequences of opening and closing of the valves. Make sure that all lines are secured and anchored. Check the monitoring equipment prior to the main treatment. Make sure that adequate (in accordance with the requirements on the SHOC or MSDS cards) first-aid facilities, including qualified personnel, are available on-site. Establish – prior to the treatment – handling and disposal procedures for chemicals, empty containers and back-produced fluids. 9.7.3 Personnel (Training, Supervision) Properly trained personnel are the keys to success. The wellsite personnel must understand the fundamentals of the stimulation technique that will be used and must know how to use the equipment, software and techniques. Two main keys to effective QC are communication and documentation. The designer must communicate the design expectations to the material suppliers. Because these expectations must be consistent with the supplier or manufacturer’s specifications, the specifications should be available to the designer. http://www.petrom.com 9-59 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING Appendix 9-A Commercially Available Acid Systems Specification Details Table 9-21 Commercial Sand Acid 1 General Fluid Description Halliburtom Energy Services 6% HCl-1.5% HF 6% HCl-1.5% HF 7.5% HCl 10% HCl-1% HF 7.5% HCl 10% HCl-1% HF 12% HCl-3% HF 12% HCl-3% HF 13.5% HCl-1.5% HF 15% HCl 13.5% HCl-1.5% HF 15% HCl BJ Services Schlumberger Dowell Half strength Mud Acid (H948) 7.5% hydrochloric acid Regular Acid (7.5%HCl) 10% HCl-1% HF Custom Blend Regular Mud Acid 12% HCl-3% HF (H949) 13.5% HCl-1.5% HF Custom Blend 15% hydrochloric acid Regular Acid (15% HCl) 6% HCl-1.5% HF 15% HCl with gelling agent 15% HCl + SGA-HT Gelled Acid, LT-100, HT-200 28% HCl 28% HCl 28% hydrochloric acid Acetic - HF system None CLAYFIX 5, 2% Ammonium Chloride, 5% Ammonium Chloride Acetic:HF Regular Acid (28% HCl) (H28) Organic Mud Acid Ammonium chloride J285 Ammonium chloride 9-60 http://www.petrom.com DGA 100, DGA 200, DGA 300, DGA400 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 9. STIMULATION BY ACIDIZING Table 9-22 Commercial Sand Acid 2 Generic Fluid Description Halliburton Energy BJ Services Services Aromatic solvent Paragon Xylene Aromatic solvent that Paragon 100E+ Envirosol XS does not contain xylene, benzene, toluene or Asphaltenic compatible Carbonate Completion One Shot Plus acid system for acidizing Acid of sandstone and carbonate reservoirs Biodegradable, nonParagon EA aromatic solvent CO2 conditioning system Gidley’s CO2 Conditioner (No competive equivalent HES exclusive patent Diesel Diesel Diesel Emulsified acid Carbonate Emulsion Emulsified Acid Acid Foamed acid Formic - HF system Fines Recovery Acid None Foamed Acid Formic: HF Gelled acid Schlumberger Dowell A26, P121 P129 MISCA P130 U051 Super X Emulsion, Super X Emulsion HT, Dowell Acid Dispersion (DAD) Foamed acid Organic Mud Acid (H954) DGA 100, DGA 200, DGA 300, DGA400 Carbonate Stimulation Gelled Acid, Gelled Acid Acid 100, Gelled Acid 200, Gelled Weak Acid HCl based, iron control Fe Acid, Double Ferrotrol Agents Micellar Iron and acid system (non-H2S Strength Fe Acid Sludge Control environment) Agent (MISCA) HCl-HF system for use in Silica Scale Acid BJ Sandstone Acid geothermal wells HCl-HF system with Sandstone Completion BJ Sandstone Acid surfactant and aluminum Acid scale inhibitor Hydrochloric acid / CLAY-SAFE H ammonium chloride conditioner Hydroxy Propyl Guar J347 Hydroxypropyl guar WG-11 Gelling Agent gelling agent http://www.petrom.com 9-61 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 9. STIMULATION BY ACIDIZING Table 9-23 Commercial Sand Acid 3 Generic Fluid Description In-situ gelled acid Halliburton Energy BJ Services Services Zonal Coverage Acid Low strength HCl-HF K-Spar Acid system for use in high feldspar/fines applications Nitrogen Nitrogen Organic acid 10% Formic, 10% Acetic Organic acid / ammonium CLAY-SAFE 5, CLAYchloride conditioner SAFE F Organic acid for high Hot Rock Acid temperatures Volcanic Acid I, Volcanic Acid II Organic HF system Potassium chloride 2% KCl Retarded HF system with Fines Control Acid surfactants Seawater Seawater Sour well iron control acid SWIC Acid, SWIC II system Water Water Xylene Xylene 9-62 BJ Sandstone Acid Schlumberger Dowell Leak Off Control Acid (LCA), Self Diverting Acid Clay Acid Nitrogen Organic Acid Nitrogen L001, L036, L400 Organic Acid L400, L036 Acetic:HF Formic:HF Organic Mud Acid Potassium Chloride M117 BJ Sandstone Acid Clay Acid Seawater Ferrotrol-HAS + Ferrotrol-HSB Water Xylene http://www.petrom.com Seawater A255 Water A26 2012 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 9. STIMULATION BY ACIDIZING Table 9-24 Commercial Carbonate Acid 1 Halliburton – Carbonate 20/20 Matrix Acidising Systems Acid Composition Adventages Carbonate Completion Acid 10 to 28% HCl This totally soluble acid blend is + FDP-S562A inhibitor universally applicable to most well + FDP-S562B anti-sludge conditions. Designed to minimise Optional: emulsion and sludge problems FDP-S562C H2S scavenger even in sour wells. FDP-S562D iron reducer FDP-S562E dispersant Carbonate Stimulation Acid 15% HCl Gelled acid improves stimulation + 2% SGA-HT results. Moderate viscosity Optional: enhances zonal coverage and 1 to 4% gelling agent minimises fluid loss. SGA-HT, SGA-II, SGA-III Fines Recovery Acid 70 v/o nitrogen The system of choice for low30 v/o 20% HCl solubility formations. Gelling (2.5% SGA-1 in the HCl) agent also functions as a foaming agent and fines suspender. Foam enhances fines carrying capacity and aids in fluid recovery. 70 v/o 22% HCl Ultra-retarded acid system Carbonate Emulsion Acid 30 v/o diesel enhances zonal coverage and (2.5% AF-61 in the diesel) efficiently generates wormholes under nearly all conditions. Zonal Coverage Acid 15% HCl + 2% SGA-II The ultimate in-situ diversion for + 4.5% gal/Mgal XL-1 matrix acidising and fluid-loss + 2 gal/Mgal BF-1 control in fracture acidising. + 4 lb/Mgal Ferchek Hot Rock Acid 9% Formic – 13% Acetic The system of choice when + 0.5% MSA-II corrosion concerns or formation + 0.5% LoSurf-259 compatibility problems preclude + 1.5% SGA-HT the use of HCl. http://www.petrom.com 9-63 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 9. STIMULATION BY ACIDIZING Table 9-25 Commercial Carbonate Acid 2 Main Dowell Acid Formulations For Carbonate Matrix Acidising Acid/Description Treatment / Reservoir Recommended Advantages Conditions Applications Dowell X Production restricted Matrix Acidising and Economical and Inhibited HCl 5 to 15% due to damage or low Acid Fracturing; versatile formation permeability Carbonate and Iron (27 to 204 °C) Scale Solvent Super X Production restricted Matrix Acidising or Acid Greater dissolving Inhibited concentrated due to damage or low Fracturing; removal of power than equal HCl formation permeability formation damage or volume of Dowell X 20 to 28% (27 to 177 °C) scale deposits XX Intensified Acid Low or damaged Matrix Acidising or Acid Accelerated reaction Inhibited HCl with HF permeability in Fracturing rate with dolomite intensifier dolomite or siliceous and siliceous limestone reservoirs limestone (27 to 204 °C) Super X EmulsionSXE 27 to 150 °C All applications Highly retarded with Emulsified HCl i.e. oil outside phase 70/30 HCl/oil MSR 100, MSR 150 Drilling muds lost to the Matrix Acidising; Acid Brings back large Blend of 7.5 to 15% formation; or reservoir Fracturing; Formation amounts of muds inhibited HCl and special has a high percentage Cleaning; Wellbore and clays; minimises clay dispersing, of silts and clays (27 to Cleanup and Gravelreprecipitation of suspending and chelating 121 °C) Pack Cleanup Fluid dissolved iron agents DGA100 Carbonate reservoirs Acid Fracturing; reactive Exceptional fluidThickened inhibited (especially older wells) stages in DUOFRAC II loss control and 15% HCl where wider and treatments improved etch deeper penetrating patterns; suspends fractures are needed and removes silts (27 to 121 °C) and solids with spent acid returns DGA200 HCl thickened up to a maximum of 28% 9-64 Low-temperature carbonate reservoirs Acid Fracturing; Formation Cleaning of Fissured Reservoirs, DUOFRAC II treatments for low-temperature wells (66 °C) http://www.petrom.com Retarded reaction rate; reduced leakoff, low viscosity when spent for good cleanup; liquid additive gels up to 28% HCl OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 9. STIMULATION BY ACIDIZING Table 9-26 Commercial Carbonate Acid 3 Acid/Description DGA300 HCl thickened up to a maximum of 28% DGA400 HCl thickened up to a maximum of 28% Foamed X Stable inhibited HCl and foam; 55 to 85% foam quality SDA (Self Diverting Acid) HCl thickened up to a maximum of 28% Treatment / Reservoir Conditions High-temperature carbonate reservoirs Recommended Applications Acid Fracturing; Formation Cleaning of Fissured Reservoirs, DUOFRAC II treatments for high-temperature wells (149 °C) Carbonate reservoirs less than 149 °C Acid Fracturing; Formation Cleaning of Fissured Reservoirs; DUOFRAC II treatments Low-pressure, lowAcid Fracturing and permeability carbonate Formation Cleaning of reservoirs (27 to 121 °C) Fissured Reservoirs Carbonate reservoirs less than 149 °C Formation Stimulation, Cleaning of Fissured Reservoirs Advantages Retarded reaction rate; reduced leakoff, continuous- or batchmix applications; stable at high temperatures. Gels up to 28% HCl Reduced leakoff; batchor continuous-mix operations; stable at high temperatures Improved leakoff control and well cleanup with more efficient return of treating fluids Self diversion mechanism, deep acid penetration Table 9-27 Commercial Carbonate Acid 4 BJ Services International Matrix Acidising Systems Type/Name Purpose/Advantages High-rate, near-wellbore treatments. Excellent friction reduction. Lightly gelled acid Various strengths of HCl acid with low concentrations of gellant (e.g. DSGA or AG-57L at 4 l/m3) Gelled Acid 100, Gelled Acid 200, Gelled Weak Acid Enhanced zonal coverage, fines Various strengths of HCl with various concentrations suspending and reaction rate of gellant retardation In-situ crosslinked acid, (Enhanced Acid System) Effective diversion for treatment of Various strengths of HCl, 5 to 28% long intervals, horizontal wells XL Acid III (various strengths of crosslinked HCl acid) Suitable for high viscosity diversion stages in matrix acid treatments Foamed acid Improved diversion, leak off control and fines recovery Organic acid High-temperature treatments Specialty acid systems, e.g. One Shot Acid “Plus” Treatment of asphaltenes and sludges. Blend of aromatic solvents and acid http://www.petrom.com 9-65 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING Appendix 9-B Commercially Available Additives and Solvent Specifications Table 9-28 Commercial Sand Additive 1 Generic Aditive Description Halliburton Energy BJ Services Services Acid corrosion inhibitor HII-124B, HII-124F, intensifier HII-500M Additive for use in aromatic Targon II solvents to enhance asphaltene dissolution AS-5, AS-9 Anionic, anti-sludging surfactant Anionic, de-oiling, Morflo III nonemulsier for aquaeous based fluids Antisulfide-cracking agent SCA-130 9-66 Schlumberger Dowell Hy Temp I, Hy-Temp A201, A153, A179, A281 O AS-32 + NE-110W U101 AS-32 W035 / W60 NE-110W HS-2 http://www.petrom.com A255 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 9. STIMULATION BY ACIDIZING Table 9-29 Commercial Sand Additive 2 Generic Aditive Description Halliburton Energy Services Broad spectrum, anionic NEA-96M surfactant for aqueous based fluids Broad spectrum, cationic 19N, 20N surfactant for aqueous based fluids Broad spectrum, nonionic Losurf 300, Losurf surfactant for aqueous based 259, Losurf, 357 fluids Cationic oligimer for clay Cla-Sta XP stabilization in aqueous Cationic liquid friction FR-28LC reducer Cationic, mineral fines and Cla-Sta FS clay stabilizing additive in aqueous fluids Ethylene glycol mono butyl Musol ether Ferric iron reduction system FERCHEK SC for iron control in sour environments High temperature corrosion HAI-85M inhibitor for use up to 500°F with all strengths of acid and on corrosion resistant alloys Hydroxypropyl guar gelling WG-11 agent Improved mutual solvent that Musol E does not contain EGMBE and is therefore more enviromentally friendly Micellar surfactant system SSO-21M with foaming and fluid recovery properties for use at 225 °F and below Micellar surfactant system SSO-21HT with foaming and fluid recovery properties for use above 225 °F BJ Services Schlumberger Dowell AS-32, NE-110W F104 LT-17 F078, M38B NE-118, NE-940 F75N, F103 Claymaster 5C L055 AG-12, Acigel J507, J313 Claymaster FSC L042 US-40 U066 Ferrotrol-200 or 210 L63, L58 A280 / A282 with A281 J347 Hydroxy Propyl Guar Gelling Agent US-2 LT-32 + Floback-30 LT-32 + Floback-30 http://www.petrom.com 9-67 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 9. STIMULATION BY ACIDIZING Table 9-30 Commercial Sand Additive 3 Generic Aditive Description Halliburton Energy Services Mutual solvent composed of a Musol A blend of alcohols/ethers for acids Nonionic blend of surfactants, Losurf 396 dispersants and solvents for use where health, safety and environmental regulations are concerned Nonionic microemulsion Pen-88M penetrating agent for use at 225 °F and below Nonionic microemulsion Pen-88HT penetrating agent for use above 225 °F Sperse-All M, Nonionic surfactant A-Sperse dispersant Nonionic, anti-sludging AS-7 surfactant Nonionic, penetrating Pen-5M surfactant Oil soluble non-emulsifying Hyflo IVM surfactant Organic acid corrosion MSA-II inhibitor Organic acid used for iron Fe-1A, Fe-2 control Organic alcohol Methanol Oxygen scavenger used for FERCHEK iron control Sandstone acidizing additive ALCHEK for the prevention of secondary precipitation of aluminum Sequestering/reducing and FERCHEK A scavenging agent for iron control in acids Soluble corrosion inhibitor for HAI-81M use up to 400 °F 9-68 BJ Services US-2 Schlumberger Dowell U100 F103 LT-32 LT-32 D-4GB F040 None W054 LT-32 F075N NE-118 F040 CI-20 A186, A272 Acetic Acid, Citric L001, L400 Acid Methanol, K046 Isopropyl Alcohol Ferrotrol-200 or L058 210 BJ Sandstone Acid L041, U042, L62 Ferrotrol-810, Ferrotrol-270 &271, FerrotrolCI-30NF + HyTemp A270,A280 400 http://www.petrom.com 2012 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 9. STIMULATION BY ACIDIZING Table 9-31 Commercial Sand Additive 4 Generic Aditive Description Halliburton Energy Services HAI-OS, HAI-NS Soluble, enviromentally acceptable corrosion inhibitor for use up to 200 °F Surface tension reduction and Superflo III fluid recovery surfactant SGA-1 Surfactant gelling agent for acids HC-2 Suspending agent/foaming surfactant for acids Synthetic, cationic gelling SGA-HT agent for acids up to 400 °F BJ Services Schlumberger Dowell A259, A261, A262 CI-27 Inflo-150, Inflo-100 F075N, F103 AG-10 J508 FAW-21 F78, F100 AG-12, Acigel J507 Table 9-32 Commercial Sand Additive 5 ADDITIONS from DS Halliburton Energy Services BJ Services Environmentally acceptable anionic anti-sludging agent Environmentally acceptable friction reducing agent Environmentally acceptable organic acid corrosion inhibitor Environmentally acceptable suspending agent/foaming agent for acids Environmentally acceptable, broad spectrum nonionic surfactant for aqueous-based fluids Soluble environmentally acceptable corrosion inhibitor for use up to 400 °F Schlumberger Dowell W060 J507 A272 F100 F103 A259 and A282 http://www.petrom.com 9-69 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING List of Figures Figure 9-1 Skin factor as a function of damage radius and damage ration (kd/k), Figure 9-2 Pressure profile of damaged and undamaged well, Figure 9-3 Formation damage types, Figure 9-4 Formation damage types and treatment selection, Figure 9-5 Basic Fluid Selection for Well Acidizing, Figure 9-6 Constituents of sandstone which are soluble in HCl/HF acid systems, Figure 9-7 Various Wormhole structures, Figure 9-8 Wormholing controlled by diffusion, Figure 9-9 Various Wormhole structures (Fredd and Fogler, SPEJ, 1998, 1999; Hoefner and Fogler, AlChEJ, 1998), Figure 9-10 Model 1 Preflush/Overflush Fluid Selection, Figure 9-11 Model 1 Main/Base Treatment Fluid Selection, Figure 9-12 Main Treatment Fluid Selection including presence of high sensitivity Clays and Zeolites, Figure 9-13 Main Treatment Fluid Selection including presence of high sensitivity Clays, Chlorite and Glauconite, Figure 9-14 Model 1 Main/Base Treatment Fluid Selection including presence of high sensitivity Clays, Zeolites and Glauconite, Figure 9-15 Model 2 Preflush/Overflush Fluid Selection including presence of high sensitivity Clays, Zeolites and Glauconite, Figure 9-16 Model 2 Main Treatment Fluid Selection including presence of high sensitivity Clays and reservoir temperature, Figure 9-17 General Workflow for choosing a diversion method for matrix acidizing, Figure 9-18 Diversion selection workflow, Figure 9-19 Impure dolomite: Quartz grains (white crystals) scattered in the dolomitic matrix (brown crystals of dolomite), Figure 9-20 Fluid selection workflow for carbonate acidizing, Figure 9-21 Improper acid placement in carbonate formation, Figure 9-22 Matrix Acidizing Planning Schedule, Figure 9-23 Evaluation of matrix stimulation using prediction diagram and injection test, 9-70 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Workover Best Practices 9. STIMULATION BY ACIDIZING Figure 9-24 Field Acid Response Curve, Figure 9-25 Injection rate and pressure during job in Well 2, Figure 9-26 Field Acid Response Curve, Figure 9-27 Workflow of matrix acidizing control in real time, Figure 9-28 Typical Surface Equipment Layout for Standard Matrix Acidizing without using foam, Figure 9-29 Typical Surface Equipment Layout for Matrix Acidizing with Foamed Acid, Figure 9-30 Dipolar surfactant composition. http://www.petrom.com 9-71 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING List of Tables Table 9-1 Summarized skin components, Table 9-2 Primary chemical reaction in acidizing Table 9-3 Damaging HF reactions in sandstones, Table 9-4 Maximum protection time for different acids and temperatures, Table 9-5 The reaction of HCl with carbonates, Table 9-6 Solubility of Common Minerals in Acid, Table 9-7Model 1 Preflush Fluid Selection, Table 9-8 Model 1 Preflush /Overflush fluid selection including presence of HCl sensitive minerals Table 9-9 Model 1 Main/Base Treatment Fluid Selection, Table 9-10 Model 1 Main/Base Treatment Fluid Selection including presence of high sensitivity Clays, Zeolites and Glauconite, Table 9-11 Preflush /Overflush fluid selection including presence of HCl sensitive minerals and temperature Table 9-12 Main Treatment Fluid Selection including presence of HCl sensitive minerals and temperature, Table 9-13 Acid treatment guideline, Table 9-14 Recommended volume of treatment fluid, Table 9-15 Wormhole structure, Table 9-16 Statistical analysis of well-documented matrix stimulation treatments, Table 9-17 Main Reasons for failures, Table 9-18 Reasons for failures and corrective actions, Table 9-19 Matrix Acidizing Planning Schedule, Table 9-20 Temperature limits for corrosion inhibitors, Table 9-21 Commercial Sand Acid 1, Table 9-22 Commercial Sand Acid 2, Table 9-23 Commercial Sand Acid 3, Table 9-24 Commercial Carbonate Acid 1, Table 9-25 Commercial Carbonate Acid 2, 9-72 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 9. STIMULATION BY ACIDIZING Table 9-26 Commercial Carbonate Acid 3, Table 9-27 Commercial Carbonate Acid 4, Table 9-28 Commercial Sand Additive 1, Table 9-29 Commercial Sand Additive 2, Table 9-30 Commercial Sand Additive 3, Table 9-31 Commercial Sand Additive 4, Table 9-32 Commercial Sand Additive 5. http://www.petrom.com 9-73 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 9. STIMULATION BY ACIDIZING References 1. OMV Petrom Internal Documents • Stimulation & Fracturing Activity 2010 – 2011 • Stimulation study 1 -Standard procedure for matrix treatment recipe formulation • Stimulation study 2 - standard procedure for design special matrix treatment • Field Cases of Application of Acidizing Workflow and Acidizing Best Practices Reports (Well 510 A Burcioaia, G10 Lebada East, 154 Bragareasa - Foam acidizing job, • Best Candidate Selection Process for Acidizing and HDF • Acid Systems Specification Details used in Petrom OMV • Additives and Solvent Specifications/Annex with procedures for testing various additives • Technical Procedure for Acidizing. WO&WI BU 2. Bert W., Gidley J. and Schechter R.: Acidizing Fundamentals, SPE of AIME, 1979 3. Buijse M.: Mechanisms of Wormholing in Carbonate Acidizing, SPE 37283, 1997. 4. Best Practices--Carbonate matrix Acidizing Treatments; Halliburton Energy Services, Inc. Bibliography No. H01276; ; Oct. 1998;. 5. Civan F.: Reservoir Formation Damage, Gulf Publishing Company, 2000 6. Daccord, G. Lenormand, R. and Liétard, O.: Chemical Dissolution of a Porous Medium by a Reactive Fluid,” Chemical Engineering Science 1993. 48, No. 1, 169-186. 7. Daccord, G., Touboul, E. and Lenormand, R.: Carbonate Acidizing: Toward a Quantitative Model of the Wormholing Phenomenon, SPE 16887, SPE Production Engineering, February 1989 8. Economides M.: A practical Companion to reservoir Stimulation, 1992 9. Economides M. and Nolte K.G.: Reservoir Stimulation, 3rd Edition 10. Economides, M. and Boney, C.: Reservoir Stimulation 11. Ely, J.W.: Stimulation Treatment Handbook, Tulsa, Oklahoma, USA, PennWell Publishing Co., 1985. 12. Gidley, J. L.: Stimulation of Sandstone Formations: A Detailed Examination of Recent Experience, paper SPE 14164, 1985. 13. Gong, M.: Quantitative Model of Wormholing Process in Carbonate Acidizing, SPE 52165, 1999. 14. Huang S. T., et al: Reaction Rate and Fluid Loss; The Keys to Wormhole Initiation and Propagation in Carbonate Acidizing; SPE 37312,1997. 15. Mostofizadeh B., et al; Optimum Injection Rate From Radial Acidizing Experiments, SPE 2854, 1994. 16. McLeod, H. O.: “Matrix Acidizing,” paper SPE 13752, 1984. 17. McLeod, H.O. Jr., Ledlow, L.B. and Till, M.V.: The Planning, Execution and Evaluation of Acid Treatments in Sandstone Formations, SPE 11931, 1983. 18. Kalfayan L., Production Enhancement With Acid Stimulation, 2008 19. Kalfayan, L.J. and Watkins, D.R.: A New Method for Stabilizing Fines and Controlling Dissolution During Sandstone Acidizing, SPE 20076, 1990. 20. Paccaioni G., M. Tambini SPE, Advances in matrix Stimulation Technology (pp. 256-263), 1993 Journal of Petroleum technology, Feb. 1987; Role of Acid Diffusion in Matrix Acidizing of Carbonates; M. Hoefner, et al; (pp. 203-208). 9-74 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 9. STIMULATION BY ACIDIZING 21. Paccaloni, G.: A New, Effective Matrix Stimulation Diversion Technique, SPE 24781, SPE Production & Facilities , August, 1995. 22. Prouvost, L. and Economides, M.J.: Applications of Real-Time Matrix-Acidizing Evaluation Method, SPE 17156, SPE Production Engineering, November, 1989. 23. Recommended Practices for Laboratory Testing of Surface Active Agents for Well Stimulation (RP 42), second edition, Dallas, Texas, USA, American Petroleum Institute (January 1, 1977). 24. Schehter R.: Oil Well Stimulation, Prentice-Hall, Inc. 1992; 25. Wang Y. , et al: The Optimum Injection Rate for Matrix Acidizing of Carbonate Formations, SPE 26578 1993. 26. Wang, Y., Hill, A.D. and Schechter, R.S.: The Optimum Injection Rate for Matrix Acidizing of Carbonate Formations, SPE 26578, 1993. 27. Walsh, M. P., Lake, L. W. and Schechter, R. S.: A Description of Chemical Precipitation Mechanisms and Their Role in Formation Damage During Stimulation by Hydrofluoric Acid, SPE 10625, 1982. http://www.petrom.com 9-75 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL 10. SAND CONTROL Contents EXECUTIVE SUMMARY ....................................................................................................................... 10-1 10. SAND CONTROL ............................................................................................................................ 10-5 10.1 Introduction ........................................................................................................................ 10-5 10.1.1 The Fundamentals of Sand Control (Justification, Why, Sand Control Management strategy)..................................................................................................................... 10-5 10.1.2 Overview of Sand Control Methods Applied in OMV Petrom SA............................... 10-7 10.2 Sand Control Technologies Overview ............................................................................... 10-12 10.2.1 Selection the Best Sand Control Technology ........................................................... 10-13 10.2.2 Gravel Pack Technology in cased and open hole ..................................................... 10-15 10.3 Mechanical Sand Control Methods .................................................................................. 10-20 10.3.1 Standalone Screens Selection Workflow ................................................................. 10-20 10.3.2 Gravel Pack Design and Best Practices Workflow Applied in OMV Petrom............. 10-32 10.3.3 Frac-Pack Design and Best Practices Workflow Applied in OMV Petrom .............. 10-47 10.4 Gravel Pack Operational Aspects ...................................................................................... 10-60 10.4.1 GP Workstring/Service Tools .................................................................................... 10-61 10.4.2 Gravel Pack Completion Tools Currently Used in OMV Petrom .............................. 10-65 10.5 Surface Equipment............................................................................................................ 10-77 10.5.1 Major Considerations in Equipment Preparation and job Planning ........................ 10-77 10.5.2 Pumping Equipment and Filtering System ............................................................... 10-78 10.5.3 Treatment Monitoring System ................................................................................. 10-80 10.6 Materials for Sand Control................................................................................................ 10-81 10.6.1 Carrying Fluid............................................................................................................ 10-81 10.6.2 Gravel Pack ............................................................................................................... 10-81 10.6.3 Coated Gravel Pack .................................................................................................. 10-81 10.6.4 Other Chemicals ....................................................................................................... 10-82 10.7 Quality Assurance and Safety Requirements.................................................................... 10-82 10.7.1 Service ...................................................................................................................... 10-82 10.8 Safety Requirements......................................................................................................... 10-84 10.8.1 General Safety Considerations ................................................................................. 10-84 10.8.2 Personnel Requirements .......................................................................................... 10-86 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL Appendix 10 - A Baker Sand Control Packer Specifications and Setting Procedure .................. 10-87 Appendix 10 - B GP Completion Procedure with Mechanical Packer Type PIROM MOCA-H .... 10-90 Appendix 10 - C GP Completion Procedure with Mechanical Packer Type HOVA-C.................. 10-97 Appendix 10 - D Schlumberger Sand Control Packer Specifications ........................................ 10-103 Appendix 10 - E Weatherford Sand Control Packer Specifications .......................................... 10-104 Appendix 10 - F Standards........................................................................................................ 10-105 List of Figures............................................................................................................................ 10-106 List of Tables ............................................................................................................................. 10-109 References ................................................................................................................................ 10-111 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 10. SAND CONTROL EXECUTIVE SUMMARY EXECUTIVE SUMMARY: 10. SAND CONTROL No. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Strongly Recommended Determine the depths of the minimum four casing couples above the top of open interval/s. in order to set the GP packer on proper position. Clean perforations prior to installing gravel pack and Frac-Pack. Washing perforation and cleaning with using flapper milling tool are commonly used methods in OMV Petrom SA. Avoid pump perforating debris into the well or letting it flow back into perforations via fluid loss. The clearance between the casing and the screen should be a minimum of 12 gravel D50. Before job execution, perform QA/QC checks of materials (proppant) and fluid (carrier fluid, acid, brine/fresh water) to be used for GP and Frac-Pack The use of a dedicated clean work string strictly for gravel packing should be considered if a number of wells are to be completed. Pump gravel pack at as high a rate as possible. May be limited by surface equipment and/or tubulars. Use a representative formation sand sample and generate grain size distribution in order to select the correct gravel size in relation to the formation sand size and to select proper screen slot size and size of filters used for grave-pack fluid preparation. If long shale sections (>10m) are present, use blank pipe across these sections to prevent fines from entering the screen. High strength wire-wrapped screens should be used for better slot opening control and reduced potential for damage during installation. Use length of the screen which should provide overlapping above and below open interval/s of minimum 1.5 m. 11. Limit return/reverse rate to ensure leakoff to the perforations. 12. Apply wire spacing (Δ) is about 50-70% of the minimum grain diameter. Use the Saucier criterion for gravel sizing is. From this work he concluded that the optimum ratio, i.e. the ratio which maintains the highest pack to formation permeability ratio and avoids sand production, is between 5 and 6. 13. 14. Use surface annular pressures during Frac Pack job to identify the initiation of a TSO. Use observed pressure trends to adjust the pumping schedule and extend final stages if TSO initiation is later than expected. http://www.petrom.com 10-1 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 10. SAND CONTROL EXECUTIVE SUMMARY: 10. SAND CONTROL No. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. Strongly Recommended Record the following data during packing operations (sample frequency should be selected depend on surface and downhole conditions, best practice 3-15 second frequency): Treating pressure, annulus pressure, slurry rate , Return Rate, proppant concentration washpipe pressure, bottom hole work string and annulus pressure and accurate amount of proppant reversed out following gravel pack In Frac-Pack operation stat to injection proppant slurry at around 60-120 kg/m3 (0.5 or 1 ppg) with stages of increasing proppant concentration up to 350 to 600 kg/m3 (3 – 5ppg). For proppant selection in the case of Frac-Pack application use a D50 of proppant to D50 of formation ratio of around 8 to 10 in sizing the proppant. Where possible this should be based on sand retention tests to avoid excessive fines plugging. Use Workflow on Page 62 (Figure 10-28 to 10-32) for preparing design of Frac-Pack and executing. Workflows 10-43 to 10-47 (Pages from 81 to 85) for design and execution of GP in cased hole. Use work string so the frictional pressure drop be a minimum. Ensure that screen jacket is strong enough to prevent “pull-off” from base pipe during sand screen out. If the screenout hasn’t been occurred, the injection rate would be decreased stepwise below fracture extension rate defined by Step Rate Test in order to pack off production screens. If screen out occurs while pumping the frac pack, bleed of annulus pressure and then pressure to reverse out excess sand. Pressure test surface injection lines and workstring up to 20% above referent test pressure (Preftest) . If maximum designed treated pressure (Ptrmax) is greater than hydraulic packer ball shear out pressure (Ppacker) then the reference pressure should be taken (Ptrmax), otherwise, Ppacker should be used as referent pressure. For Frac-Pack operation use fracturing fluids that have efficiencies less than 30%. Before job, perform QA/QC checks of the proppant, viscosifier, cross-linker, breakers, and mix water to be used for the Frac-Pack treatment. Check casing burst below the packer and collapse of blank pipe and downhole tools to prevent burst/collapse at maximum rate proppant loading during Frac-Pack operation.. Screens with centralizers which are corrosion resistant and easy to mill. Minimize GP plugging caused by fines migration and clay swelling using new technology solution capable to inhibit fines movement and clay swelling. Use guidance below to determine minimum size of the filter for filtering brine used for GP and Frac-Pack operations. 30. 10-2 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL EXECUTIVE SUMMARY: 10. SAND CONTROL No. 1 2 3 4 Not Recommended at All To use mixed material (standard steel and for example Inox) for various component of downhole equipment. To perform the GP operation if ratio of washpipe OD to screen base pipe ID is not approximately equal to 0.8*. *Achieving this ratio in some screen sizes will require the use of special flush joint washpipe connections. To start GP or Frac-Pack job without running casing scrapers to the top of open interval/s. Start GP and Frac-Pack without pickling the work string with a pipe dope solvent and at least 10% HCl. Mass of gravel to pack unit length of tubing in various production casing less than as specified. 5 6 7 8 To start Frac Pack treatment with proppant concentration greater than 200 kg/m3. To clean the well quickly in order to prevent gravel pack destabilization. Over displace the Frac-Pack. To leave material in the wellbore as a result of drilling and cementing the well which can cause serious damage to the Frac-Pack. http://www.petrom.com 10-3 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL 10-4 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL 10. SAND CONTROL 10.1 Introduction Sand control techniques are used in reservoirs susceptible to shear and/or tensile failure from drag forces and loads applied to the rock matrix from production and depletion. Sand management solutions should be based on a balance of technical (reservoir rock properties and depletion stage, available equipment, complexity of completion, proper execution and quality control), economic (cash flow and rate of return etc) and risk constraints (reducing well inflow performance, conditions of downhole equipment, unpredictable fines migration, incompatibility of reservoir fluids and GP carrier fluid etc.). The essential goals of best practices and sand management are to optimize production by preventing or delaying sand production throughout the life of a well or field. OMV Petrom has decided to use Gravel Pack and Frac Pack as the two most applicable solutions fitting the current reservoir conditions and expectations related to production goals. Chemical methods (resin injection) has been tried in the past however, OMV Petrom currently uses only Gravel packs and Frac Packs. 10.1.1 The Fundamentals of Sand Control (Justification, Why, Sand Control Management strategy) Formation sand production results in lost production and plugged gravel packs, screens, perforations, tubulars, surface flow lines, and separators. In addition to damage caused to surface equipment by plugging, casing and surface equipment can erode due to abrasive, sand-laden fluid flow from the well. Worst-case sand production problems can cause total well failure or the need for recompletion from casing collapse, open-hole collapse, or both. Quantification of Sand Production Risk Traditionally, sanding risk is perceived as the risk of reaching the operative conditions at which sand begins to enter into the wellbore. It is implicitly assumed that sand will eventually cause unbearable problems and that no effective action can be taken to cope with it but to avoid the sand inflow. Sand management extends this concept by assuming that sand production is not always unacceptable, economically or for safety. The goal is to define the conditions at which each single sand-related problem (steel erosion, perforations plugging, sea-line blockage, separator filling-up, etc.) can occur in each individual case. To achieve this, analysis has to rely on different models and criteria that act as tools to estimate the risk of each individual problem. Integration of these results can define production ranges within which total risk is acceptable, and may help the reservoir and completion engineers to make logical choices to extend these production ranges. Quantification of each particular risk could provide answer on following questions: http://www.petrom.com 10-5 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL • • • • Is a sand control method required? Which method would be best to fit the well conditions and production requirements? When to apply sand control? How to implement the selected sand control method? Providing answers on these questions is a step by step integrated sand management process consisting of sand problem analysis, methodologies, data required and decision workflows, for selecting the best method, as shown in Figure 10-1. The whole process is completed with an economic and risk analysis in order to select, verify and justify the selected sand solution. OMV Petrom is following the previously described sand management model in both cases, when a Gravel Pack or Frac-Pack should be applied. Figure 10-1 Sand Control Process Managing An essential part of the sand management workflows is prediction of sand production. Sand production risk is addressed in terms of critical drawdown and reservoir pressure. The reservoir pressure depletion, well trajectory, perforation orientation and water-cut are the factors that affect critical drawdown. Collecting information during well testing in new wells and monitoring the content of the sand in the produced fluid can be used to correlate the critical drawdown and sand occurrence in produced fluid. History has confirmed that there is direct correlation between reduced reservoir pressure and increased sanding potential. It is recommended to make sensitivity analysis and to define critical drawdown and sanding potential as shown in Figure 10-2 A correlation with maturated offset wells is the most reliable and applicable method to select the correct applications for sand control. The success rate of GP applications (80-85%) confirms that this methodology has been successful. 10-6 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Figure 10-2 Critical drawdown and sanding potential 10.1.2 Overview of Sand Control Methods Applied in OMV Petrom SA The analysis that has been done by Sand Control Department showed that 41% total oil production in Petrom OMV require sand control. Currently, Gravel Pack is the most applied technique. The application of the gravel pack started in 1996 and Figure 10-3 shows the brief history of GP application and various stages in GP development life. Figure 10-3 Gravel Pack Life Time in OMV Petrom The wells completed with GP produce 82% of the total production impaired by sand while the Frac Pack application is contributing around 6%. The remaining 12% of wells which have an identified sand problem currently do not have any method of sand control. Failure Analysis of Sand Control Completion The sand control system has to be selected not only for its ability to keep sand from the wellbore, but also for its ability to maximize safe production throughout the well’s life. Improperly executed or inappropriate procedures can result in damaged screens or ineffectively placed gravel and frac packs, leading to system failure during early or even initial production. Incompatible processes and materials, sometimes coupled with, and sometimes the result of, poor reservoir understanding can lead to corrosion, erosion and other mechanical failures. Systems will eventually fail when screens or packs are required to perform beyond the life or service conditions for which they were originally designed. http://www.petrom.com 10-7 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL The most common point of failure in sand control systems is at the screen designed to constrain the gravel or, in the case of screen-only completions, at the formation. Screens typically fail as the result of productivity or completion activities. Failure causes can be grouped in the following categories: • Destabilized annular gravel pack due to excessive flow velocity through the perforations • Screen erosion • Screen corrosion • Localized hot spots caused by flow around sections of plugged screens or by inadequate annular gravel packing screen collapse from compaction • Screen collapse caused by plugging. The gravel pack main components and corresponding functions are shown in Figure 10-4 . Figure 10-4 Internal Gravel Pack System Boundary These mechanisms often work in concert to cause final system failure. This is particularly true in the case of interplay between destabilized annular packs, screen erosion and corrosion. In this scenario, as the gravel packed into the annulus or the perforation tunnels becomes unstable and shifts, gaps are created through which formation fluids flow at high velocity. Sand particles moving in this highvelocity stream pummel the screen, initiating and then accelerating its erosion. How quickly a screen fails depends on fluid-flow velocity, angle of incidence of the flow, sand particle size and concentration, flow duration and fluid properties such as density and viscosity. This same mechanism works to hasten failure in screen sections already made vulnerable by corrosion The key elements of the failure analysis standards and definition are shown Table 10-1. Table 10-1 Failure Analysis Component 10-8 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Figure 10-5 Internal Gravel Pack System Functional Block Diagram Sand Control Completion failure analysis in OMV Petrom still is not organized at such level to enable tracking of the sand completion failures. According to standard ISO 14224 (industry guideline), there is established consistent terminology and structure for classifying, recording and storing the various attributes of a failures analysis of various equipment. ISO 17824 is standard established for tracking failure analysis of sand control completion. Using the proposed methodology for failure analysis, in the table … is shown statistical analysis of the most frequent causes of gravel pack failures based on data collected from the Assets for the last three years (from 2009 to 2011) . The total installed GP systems in this period is 694 and 86 GP system has been failed due to various reason as shown in Figure 10-6. The number of failures has been decreasing from 44 in 2009 to 8 in 2011 year. Figure 10-6 GP completions analysis in OMV Petrom (from 2009 to 2011) http://www.petrom.com 10-9 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL The Gravel Packing completions percentage for each Asset and failure rate are shown in Figure 10-7. The highest failure rate (37%) has been recorded in Asset 7. Figure 10-7 GP completions and failures for Assets Fines migration and plugging of GP Screens with fines is almost in 31% direct cause of the premature failure of GP system. Running out of hole GP system because of recompletion operation in the well was the most frequent cause of ROH GP, as it is shown in Table 10-2. Table 10-2 Failure causes and statistics OMV Petrom 10-10 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL From total 86 GPs POOH, 51 completions (59.3%) had a production period shorter than 201 days (early – time failure) until next workover for POOH gravel packing downhole equipment (critical domain is 0 – 200 days). In critical domain (0 – 200 days life duration) the percentage weight for different reasons that caused completions life end for 51 completions is as follows: • GP execution faulty: 23,53% (12 completions): • GP down hole equipment broken down: 7.8% (4 completions): • Plug back and perforate upper layer: 39.2% (20 completions): • Fines migration (Dirty layers): 17.7% (9 completions): • Another reasons: 11.8% (6 completions) Figure 10-8 GP completion run life analysis In critical domain (0 – 200 days life duration) the percentage weight for different reasons that caused completions life end for 51 completions is as follows: • GP execution faulty: 23,53% (12 completions): • GP down hole equipment broken down: 7,84% (4 completions): • Plug back and perforate upper layer: 39,22% (20 completions): • Fines migration (Dirty layers): 17,65% (9 completions): • Another reasons: 11,76% (6 completions) Historically, tracking such data has been difficult but introducing the system for SCC failure analysis according to industry accepted standards can significantly improve the current best practice as well as promote introducing new solutions (stand alone screens, prevention of fines migration and clay swelling, using resin coated gravel etc). http://www.petrom.com 10-11 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL 10.2 Sand Control Technologies Overview More than 40% of the total production of oil and gas in the OMV Petrom requires the sand control. This problem occurs particularly in the Sarmatian sands. These formations are weakly consolidated by argillaceous cementing materials, interaction of intergranular friction and in situ stresses, capillary forces, and by viscosity of the fluids in place. This is due to insufficient cementing materials and a geopressured environment, reducing the effects of intergranular frictions and overburden stress. Production of the well-bore fluids creates stresses in the near-wellbore area that cause sand to be produced. The stresses are the result of localized pressure reductions, resulting in greater overburden loading on the formation matrix, and by drag of the fluid as it flows through the matrix. The magnitude of the fluid drag is dependent on the factors such as effective permeability, production rate, fluid viscosity and fluid phase. Once the destabilizing forces overcome the formation strength, sand production will follow. Restricting production rate will prevent sand production by reducing the destabilization forces to a point below the restraining forces. Determination of the maximum sand free production rate is complicated by the interaction of the previously mentioned factors. Sand production is frequently preceded by water production. Water production has a severe impact on sand strength and permeability due to dispersion of amorphous bonding materials. The released sand is triggered by excessive drawdown, which causes local failure around the perforation, or by depletion, which caused shear failure in the entire reservoir. Maximum and free drawdown is more pronounced in a gas reservoir than in a liquid reservoir. This allowable drawdown decreases as reservoir pressure depletes. The installation of gravel packs has been the most popular method to alleviate the sand production problem and permit high rate completions. These gravel pack installations have proved successful in surviving the depletion life of most reservoirs. To improve gravel packing results and to optimize completion efficiency various methods have been used and applied (such as acidizing, increasing perforation shot density, minimizing fluid loss, using high conductivity sand (proppant), and placing larger quantities of gravel through the perforations). In recent years Frac-Pack has been a very attractive and effective method of providing long term high performance results in reservoirs where mechanical methods are not applicable. Field procedures and equipment utilized to perform gravel pack jobs are critical to the results achieved. Sizing the gravel, selection of the screen, the placement method and the down-hole equipment must be followed by competently executed field procedures and personnel. Unexpectedly produced sand can lead to erosion, loss of integrity and potential fatalities. Conversely, unnecessarily installing sand control can be expensive and detrimental to productivity and reservoir management. The installation of sand control in wells is considered one of the most critical components in long term service life of a well. Failure to install appropriate sand control can result in underperforming wells, possible loss of the completion and negative NPV. 10-12 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL The workflows are developed as quick tool in the selection and installation of appropriate sand control with intention to improve the existing best practice and to increase run life of the applied GP system, particularly in the most critical Assets where GP run life is less than 200 days. 10.2.1 Selection the Best Sand Control Technology Taking into account various techniques and equipment available for selecting the best sand control method, the most critical step for applying some of the available sand control methods is the question: How should an appropriate sand control method be selected? The criteria used for selecting sand control methods in OMV Petrom are: 1.Reliability Sand control failure usually results in a side track or well abandonment. Care must always be taken when using historical data on reliability to ensure that the environment is similar, the tools and techniques have not improved and to ensure a valid statistical approach is used. 2. Productivity For economic evaluation the well productivity should be converted into comparable (discounted) production profiles. These profiles need to include completion effect, reservoir depletion and water/gas influx. 3. Cost The required costs for implementation of sand control method/s must be all-encompassing. Total costs include: equipment, material and installation costs, as well some associated costs caused by additional operations to assure proper application of selected method (eventual change of mud type prior application of GP in open-hole, additional wiper trips for an expandable sand screen or different trajectories/reservoir section lengths). 4. The ability to control water or gas/zonal isolation Essentially, a management process of the well completed by gravel pack or Frack-Ppack method means efficient control of water and gas inflow. By including reservoir dynamics and behavior of the well before and after sand control application gives possibility to successfully regulate excessive water and/or gas production. The proposed matrix which correlates the previous four criteria/factors and applied sand control methods in OMV Petrom is shown in Table 10-3. To make an informed assessment of the first two criteria (reliability and productivity), physical testing is recommended, when possible, in order to compare: • Slurry against screen for testing of plugging and hence also erosion potential of standalone screens. • Gravel pack against core for testing of fines invasion. • Fines production and permeability change with increasing stress • Sand particle size analysis. • Fluid compatibility. Important for detailed stage design and for screen selection options, especially for open hole gravel pack. http://www.petrom.com 10-13 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL Table 10-3 Relative merits of principal sand control methods Green =Good Yellow=Moderate Red=Poor Selection workflow of the best sand control method which takes into account technical constraints and reservoir properties like permeability, formation strength, presence of formation damage and sanding time and the final choice of sand control methods will strongly depend on the answers to these critical questions: • • • • • • • • Will a new well have a problem with sand production? Is it possible to continue with production without using sand control method? Which perforation technology should be used? Can the downhole conditions be altered to produce below critical conditions? If sand production will be allowed, can the sand be removed at surface? If the well is completed as open hole, could screens be applied to stop sand production? Make decision to apply or not gravel pack. If application of gravel pack is decision how to select the optimum gravel size, cleanup technique, carrier fluid type, size and type of screens? How to select the most appropriate sand control method considering the economic criteria and analysis (NPV, ROR etc.)? The selection workflows are presented in Section 10.3 Mechanical Sand Control Methods. 10-14 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL 10.2.2 Gravel Pack Technology in cased and open hole Gravel packing is the most widely used method of controlling sand production in OMV Petrom (95%) . When properly designed and executed, this method is also the most productive for controlling sand, especially in initial completions. Gravel Packing is a technique that involves placing a specially sized gravel sheath between the formation face or perforation tunnels. The gravel pack is sized to prevent movement of formation sand. A screen is used to retain the gravel in place as shown in Figure 10-9. Figure 10-9 Schematic of Gravel Pack technology Since the first application of gravel pack in oil wells and pioneered work of E. Coberly (1937) to develop GP application workflow/guideline has a long period has passed during which a various methods and technique have been developed. The continuous research works have led to successful gravel packs application in almost all types of sand-troubled reservoirs. The essential breakthroughs in GP the developments were: (1) better methods to size gravel, (2) improved placement methods, (3) using clean completion fluids, (4) improved downhole equipment including screens and, (5) better perforating procedures. Following the general trends in GP development OMV Petrom has passed through the similar development process particularly focused on improvements of downhole equipment (packers, screens, service tools etc.). Plugging tendency and amount of solids that will pass through a gravel pack and screen is determining factor for proper application of gravel pack technology. In gravel pack completions, sand, that is larger than the average formation sand grain size, is placed between the formation and a screen or slotted liner. The gravel pack sand should retain most of the formation sand, but must allow production of formation fines to prevent plugging and loss of well productivity. A successful gravel pack completion must retain the formation sand and offer the least possible resistance to flow through the gravel itself. Figure 10-10 Non-plugged gravel pack Figure 10-11 Partially Invaded Gravel Pack http://www.petrom.com 10-15 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL Two opposite cases are shown in Figures 10-6 and 10-7. Effective gravel with little invasion of formation fines into gravel (Figure 10-10) and with intensive invasion of fines (Figure 10-11) The two most common types of gravel pack completions are an inside-casing gravel pack and an open hole or underreamed-casing gravel pack provides better conductivity through the gravel pack, but it is limited to single-zone completions. In both cases the crucial for efficient application of gravel pack technology is selection of the gravel size using known formation Particle Size Distribution (PSD curve). When designing a gravel pack it is important to take into account that the formation sand should be controlled without excessively reducing well productivity. Effective control requires a good sandcontrol design and execution, including obtaining a representative formation sand sample, grain size distribution, selecting the correct gravel size in relation to the sand size and using the optimum screen slot size to contain the gravel. Variations in rock properties, reservoir characteristics, and production environment make every sand control design unique. Careful evaluation is required for each completion to ensure the best sand control technique is implemented. Gravel Size Selection The selection of a gravel size is based primarily on the finest sand contained in the producing formation. Thus obtaining a representative sample is critical. Available types of samples are: • Sands contained within the produced fluids, • Samples obtained by bailing/washing • Sidewall samples • Samples obtained using rubber sleeve cores Generally, sand obtained from the production lines contains an excess of fines since the large grains will tend to settle back into the well. For this reason, bailed samples will generally biase toward the larger sand grain sizes. When bailed samples are the only ones available, then a very conservative criterion for gravel size should be implemented. Rubber sleeve cores are considered to be more representative than are sidewall cores, which tend to contain some sand that has been crushed by the sampling procedure. Industry recommended practice is that at least one well in each field or area that produces sand from a given geological formation be sampled completely through the producing intervals. If possible, a sample should be taken every 0.6-0.9 m (2 to 3 feet) within the formation or at every lithology change. The formation samples should be disaggregated, avoiding crushing the sand grains, and then passed through a series of sieves to separate the particulates into size ranges. To assure that the clays and the silt are separated from the sand grains, the sample is sometimes blended in water containing a dispersant. The dispersed particles are then washed through a 325 U.S mesh screen to separate most of the clay and the silt from the sand grains. The remaining sand fraction should then be dried and sieved. After shaking, the material retained on a progression off sieve sizes should be determined. The weight of the material passing through the small, wet sieve should also be measured and recorded. Two methods currently used for analysis of PSD are: Standard Dry Sieving (SDS) and Laser Particle Light Scattering Analysis (LPLSA) 10-16 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 10. SAND CONTROL It is evident from industry experience and from literature that these two methods yield very different results, as shown in Table 10-4 and Figure 10-12. The width of opening depends on the mesh and diameter of wire U.S. Mesh series specifies mesh size and width of opening, as shown in Table 10-5. Table 10-4 Comparison of Dry Sieving & LPLSA Table 10-5 US Mesh Size vs. Sieve Opening http://www.petrom.com 10-17 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL Standard Dry Sieve • • • Very common method Particles agitated during sieving so smallest dimension is measured Not recommended to measure grains less than 44 μm Laser Particle Light Scattering Analysis • • • Laser diffraction - modern, fully automated method Average grain size measured over repeated passes of laser Laser diffraction measures from 2 mm to 0.1 μm Figure 10-12 Non-Uniform Sand: Sieve Analysis vs. Laser Scattering It is recommended to use SDS data for gravel size analysis. The use of laser particle light scattering analysis data to determine particle size is not recommended for gravel pack design, however, it can be helpful in assessing presence of formation fines. A cumulative weight-percent distribution as a function of grain size shown in Figure 10-13 should be used in designing the gravel pack. The slope of this sieve-analysis plot expresses the sand’s uniformity. The grain size refers to the sieve opening which will retain grains of a particular size or larger. The cumulative grain size distribution is the cumulative weight percentage or fraction as a function of grain size; that is, the cumulative weight percentage of the sand sample with grains larger than a specific diameter. The important parameters, obtained from PSD which commonly used for properly selection of standalone screens, design gravel pack in cased or open hole wells and Frac-Pack, are: D95, D90, D50, D50, D60, D10. • • • • • 10-18 The median (D50 , half the sample has grains smaller than the median size and half larger) and based and Saucier experiments is used for selection gravel size. D10 (which gives an estimate of the largest grain diameter present in a significant amount), The uniformity coefficient (UC = D40/D90 or UC = D60/D10 used in OMV Petrom). Factor of grain asymmetry (FA ), FA=D50 -0.5 (D10 + D50), mm Sorting coefficient (SC= D10/D95) http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL The Uniformity Coefficient provides an approximate description of the distribution curve. The convention has been to describe the distribution curve by the grain size at two specific points the 40% and 90% cumulative weights. The ratio of the dimension of the grain size at 40% and 90% is called the uniformity coefficient. The slope of the curves indicates a degree of sand uniformity and sorting. Figure 10-13 Particle Size Distribution Summarizing the particle size distribution analysis for different fields as shown in Figure 10-14 using the same method, it is obvious that sand distribution curves generally are spread over a range of sizes. The next section considers of the optimum gravel pack design . Figure 10-14 Particle size distribution for different locations How to use Uniformity and Sorting Coefficients to define formation sand is shown below and in Table 10-6. D40 = Grain Diameter at 40% Cumulative Weight D90 = Grain Diameter at 90% Cumulative Weight UC < 3 (or UC < 5) Uniform Sand 3 < UC < 5 ( or 5 < UC < 10) Non-Uniform Sand UC > 5 ( or UC > 10) Highly Non-Uniform Sand http://www.petrom.com 10-19 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 10. SAND CONTROL Table 10-6 Reservoir sand characterization using PSD analysis Another commonly extracted parameter is the volume percent of fines. This is defined as those particles that pass through a 325 US mesh screen (i.e. particles less than 44 μm) and approximates the size range of particles that can cause plugging problems in both screens and gravel packs. Based on research conducted by the Shell centre, more specific guidelines have been developed to optimize the productivity of gravel pack completions. The Table 10-7 presents those results. Table 10-7 Gravel Design Criteria (proposed by Shell) Sand Sorting Good Good Poor Poor Good Good Poor Poor Sand Shape Fines Level Rounded Angular Rounded Angular Rounded Angular Rounded Angular Low Low Low Low High High High High Gravel & sand mean size ratio* Normal Gravel Synthetic Gravel External GP Internal GP External GP Internal GP 6 5 5 5 4 4 5 5 5 4 4 4 3 3 4 4 7 6 6 6 5 5 6 6 6 5 5 5 4 4 5 5 UC < 2 Sand is good sorted; UC > 2 Sand is poor sorted; Rounded sands: Roundness factor > 0.3 or sphericity > 0.8** Angular sands: Roundness factor < 0.3 or sphericity < 0.8 Low fines level: Cumulative weight percentage of fines in reservoir sand < 10%*** High fines level: Cumulative weight percentage of fines in reservoir sand >10% *If not available use gravel one size smaller **Roundness and sphericity according to API RP60 (see Appendix 10-10F ) ***Fines are defined as those particles present in the reservoir sand that are smaller than 0.1 of the mean size of the GRAVEL considered. 10.3 Mechanical Sand Control Methods Selection of the most suitable mechanical methods (Standalone Screens-SAS, Gravel Pack and FracPack) methods to control sand production and to reduce risk of premature failure of downhole equipment and decrease of well production will strongly influenced a proper selection of screen type, screen slots , gravel size, both for GP and Frac-Pack. 10.3.1 Standalone Screens Selection Workflow Standalone screens (SAS) are used extensively throughout the world due to their simplicity and low installation costs. Many high-profile failures have led to them obtaining a poor reputation. Nevertheless, in recent years, a strong emphasis on both screen selection and rigorous quality control during installation has led to substantial improvements in reliability when they are used in the appropriate environment. 10-20 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Wire-wrapped, pre-packed and premium screens are all used as standalone screens, while only wire wrapped screens are used for gravel pack application in OMV Petrom. These screens can be installed with or without a washpipe and often incorporate blank sections of pipe and external casing packers (or swellable elastomers packers). Because of the lack of pumping and screen expansion operations, they are sometimes the only form of sand control that can be deployed in extended reach wells or in many types of multilateral wells. Open hole completions, using standalone screens or slotted liners can be used in cases when sand production is not intensive. OMV Petrom has tried to use standalone filters (Baker Extruder, SLB Mesh Rite etc.) and results acquired during tests were not successful and discouraged their further application. Slotted liner application Recently, slotted liner has been applied in cyclic steam stimulated horizontal wells (length of horizontal section is 350-400m) to prevent sand (solids) production. The slotted liner is combined with STIMPEX filter installed on pump intake to protect the pump from mechanical damage due to erosion. Screen selection (length, slot size, material etc.) depend on downhole conditions, primarily of formation particle size distribution, as it is explained in section 10.2.2 Gravel Pack Technology in cased and open hole. The slot width of the liner (0.35 mm) has been selected using criteria for conventional wire wrapped screens (50-70% of the minimum gravel size selected by Saucier’s criteria) slightly modified. This slot width is allowing formation particles to pass with sizes less than 0.35mm and larger particles are kept in the formation. The number of slots is 160 per ft (around 500 per meter) and average slot length of 2 inch (50.8 mm) have been selected in order to provide minimum pressure drop and to keep mechanical integrity of liner according to API standards 05CT. As the slotted liner is part of initial completion it is very important to that drilling fluid must be properly designed to allow the filter cake to flow back through the screen without plugging the slots and reducing the target production. Using STIMPEX filter (usual slot size 0.3 mm) at the pump intake provides additional protection of pump and assures longer run life. The information collected during relatively short period of application shows that solids still causing the plunger and barrel damage of the pumps and further monitoring of well operations could provide sufficient information for eventual corrections and modifications of the applied solutions. Recommended Practice for SAS Application The screen slot openings are carefully designed to both retain the majority of the formation sand, yet allow production of formation fines below 44-50μm. This is important due to the fact that formation fines can plug the screens over time. In order to utilize this method, the sands throughout the completed reservoir need to have a high degree of uniformity, D40/D90<5. If long shale sections (>10m) are present, blank pipe is recommended across these sections to prevent fines from entering the screen. High strength wirewrapped screens are recommended for better slot opening control and reduced potential for damage during installation. http://www.petrom.com 10-21 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL Slot sizing should be based on 1xD10 of the formation, according to Rogers or 2xD10 (as recommended by Coberly) to include deviations up to an absolute maximum size of the finest particles that could be produced. This should be considered for each particular case. The smallest screen size to be run in a standalone application is 175 μm (7 gauge). If screen size based on D10 is less than 175 μm or sub 44 μm fines >5% stand alone screen application is not recommended. The screens can be installed in both Water Based Mud (WBM) and Oil Based Mud (OBM). The drilling fluid (mud or brine) must be properly designed to allow the filter cake to flow back through the screen. If installed and initially produced with particle laden fluid, careful selection of slot openings and testing are recommended to ensure proper clean up. Prepacked screens are not recommended due to high plugging tendency. If using premium screens ensure that, the well is fully displaced to a particle free fluid, before installing the screens. This is mainly to prevent the screens from plugging during installation and during flow-back (clean-up).The general workflow for selecting mechanical method for sand control is shown in Figure 10-15. More detailed workflow defining the specific condition for application of standalone screens is shown in Figure 10-16. If sand production can’t be stopped with using SAS, then in most cases application of gravel pack could assure efficient control of sand production , maximize sand oil and gas production or assure good injectivity if it would be applied in water /gas injection wells. The gravel pack installations require placement of gravel or proppant around the gravel pack screen and against the formation face. These placement methods are as follows: Low Density GP (Water Packs WP) These treatments are pumped at matrix rates or frac rates, depending upon the well conditions. Slurries contain sand (proppant) and completion fluid (or light brine]. Proppant is mixed at various concentration depend on downhole conditions in well. The most frequently method used in OMV Petrom is a technique of low concentrations 120 to 240 kg/m3 (1 to 2 ppg). High Density GP (Slurry Packs) These treatments are pumped at matrix rates. Slurries are typically batch mixed with polymer based carrier fluids. Sand concentrations are typically 700 to 1800 kg/m3 (6 to 15 ppg). They are utilized primarily in areas with low horsepower (<250 HHP) applications where batch mixing equipment is preferred. At the present time this method is not used in OMV Petrom Frac Packs (FP) These treatments are pumped at frac rates. Typical slurries contain proppant and linear or crosslinked polymer gels. Proppants are pumped in stages with subsequent increasing proppant concentration. The good results have been obtained in the last several years. There is now a unique and consistent methodology to choose between GP or Frac-Pack application. The proposed workflows could help and use as a general guideline but each well request detailed analysis before application. Adding some lessons learned from off-set wells reduces potentially risk of mistaken decision. In the Figure 10-17, Figure 10-18 and Figure 10-19 are shown developed workflows which can be used as the industry recommended practice for selection GP. 10-22 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Figure 10-15 General workflow for selecting sand control mechanical system http://www.petrom.com 10-23 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Figure 10-16 Standalone Screens Selection 10-24 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Figure 10-17 GP selection workflow-GP vs. Frac pack http://www.petrom.com 10-25 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 10. SAND CONTROL Figure 10-18 GP selection workflow for open hole wells (GP vs. SAS) 10-26 http://www.petrom.com 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Figure 10-19 GP selection workflow for cased hole wells Besides of the proposed flowcharts for cased hole GP (OMV Petrom Best Practice) and open hole GP (recommended practice in the case of future needs for the new drilled wells), the selection tables (Table 10-8 and Table 10-9) using multi-criteria evaluation are added with the intention to be used as second pass and quick guidance for selecting an optimum sand control method. http://www.petrom.com 10-27 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL The flowcharts should be used as first pass selection criteria to guide engineer to a most likely sand control option and they are in conjunction with selection tables. One of the options and recommended best practices, for both, OH and CH GP, is to use Alternate Path Technology with shunt tube (APT) in the case that GP has to be placed over long intervals in vertical and horizontal wells. The numeric ratings (i.e., 1 through 4) refer to the effectiveness of the different techniques in managing sand under a variety of wellbore and reservoir conditions and should be considered only as a guide in the overall design process.. Ratings are based primarily on data, information and experience of worldwide GP applications and could be corrected using OMV Petrom experience and results acquired during long period of GP application. Some additional factors should be considered to achieve an effective design, like: • • • • • • • • • • 10-28 Well productivity differences if various sand control methods would be used, Reliability of different sand control techniques in terms of failure frequencies which can be used to estimate the number of workovers that may be required or the probability of a workover during the life of the expected production. Reservoir Damage Potential caused by both completion fluid type and fluid losses from different technique. Effect of fines migration o CHGP Fines can migrate towards the pack and decrease the permeability of the proppant in the packed perforations tunnels significantly increasing the pressure drop (skin) through the perforations. o OHGP - Have significantly more surface area to plug with fines compared to cased hole gravel pack completions. Fines will bank at the proppant / formation interface or invade the annular area, reducing the proppant permeability and increasing the pressure drop (skin) through the gravel pack. o SAS - If screens are designed properly to allow fines to pass through, then effects of fines migration can be mitigated. If fines are not allowed to pass through the screen then results can be similar to OHGP. o FP Most forgiving completion for fines migration. More than 50 times surface area to plug compared to an underreamed openhole gravel pack. Frac wings "extend" the wellbore. With the larger wellbore, fluid velocities are reduced and the potential for fines migrations is less likely. Relative Costs associated with the different techniques. Total costs should be compared between the methods starting with the drilling of the production hole. Service Provider Capability to perform different techniques Equipment Availability/Lead Time associated with the purchased and rented equipment used by the different techniques in the actual geographical area where the installation is performed. Reservoir or Facility Constraints that effect well productivity and benefits of different techniques. Facilities must be considered in the design phase to allow production of fines. Relative Fishability of assemblies associated with different techniques, if applicable. Proven Historical Effectiveness in a given field area for different techniques. http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Table 10-8 Sand Control Selection in Cased Hole Wells a. Benefit of sand control completion decreases with increasing reservoir permeability. Fractures can still be beneficial for breaking through near-wellbore drilling and perforation damage. b. APT may be required. Net pressure increase and shunt friction pressure could be confused while monitoring surface treating pressures. Undetected high rates of slurry can enter shunt tubes resulting in catastrophic shunt/screen damage. Pump rates into shunt tubes should be selected based on tube diameter. c. Adequate returns to insure critical carrying velocity are required to ensure a full annular pack. d. Fracture may not grow across entire interval. An annular bridge may form if a thief zone is present high in the interval. Short intervals are less susceptible to incomplete annular packs after post job gravel settling than long intervals. e. It might not be able to achieve drawdown required to assist in general cleanup of gelled fluids if the reservoir is depleted. Need to ensure gels will break for easier clean up. http://www.petrom.com 10-29 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL f. (Extreme fluid loss caused by high differential could result in an incomplete annular pack and reservoir damage due to fluid invasion. g. Between 55 and 75 degrees, beds of sand deposited along the low side of the wellbore can become unstable and suddenly fall down the hole in a concentrated slug that could lead to bridging across a high leak-off zone. h. Adequate returns must be taken to avoid bridging resulting in an incomplete pack. The ability to get returns becomes more difficult with longer interval lengths, smaller washpipe and lower reservoir pressures. i. Gravity will assist in packing the annulus at low deviations. j. Annular voids are likely in this geometry. k. Packs are likely to plug resulting in high decline rates. l. Inadequately cleaned perforations may not take fluid and will not get packed. This will result in excessive completion damage caused by perforation tunnels filled with formation sand. Exceeding reservoir fracture pressure is required to break through this damage. m. Defined by a single completion with multiple productive zones separated by nonproductive barriers. n. APT adds additional complexity and risk resulting in limited benefits. Table 10-9 Sand Control Selection in Open Hole Wells 10-30 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL a. Variations in hole diameter can cause the alpha wave to stall. Higher pump rates, lower slurry concentrations, and sand free slugs can mitigate stalling. b. Depending on the cause of the rugosity, a hole that is less likely to remain stable in the production mode could be indicated. bb. Screens need to be strong enough and sized properly to address concerns during running and production in this type of wellbore. c. Must design completion and gravel pack fluids to maintain shale stability. Shale sloughing can stall or plug gravel pack. d. Vertical wells with short completion intervals and high velocities through bare screens are susceptible to erosion. This type of well is also susceptible to permeability reduction due to different formation sand/shale sorting in the annulus. e. High friction pressure is generated in the washpipe by base pipe annulus. A low fracture gradient by ECD margin can make water packing difficult. A shorter wellbore or Baker's Betabreaker technology may help. f. Special design considerations must be given to the gravel pack carrier fluid. g. High degree of reservoir lamination offers potential for shale to embed on the screen, which could lead to plugging and eventual hot spots. Consider using blank pipe and/or isolation packers across shale sections. h. D40/D90 is a quick look reference for sand uniformity, which is used to determine the applicability of screen only completions. Use standard dry sieve data for slot size analysis. The use of laser light scattering data to determine particle size is not recommended for sand control design i. Defined by a single completion with multiple productive zones separated by nonproductive barriers. j. May not be able to achieve drawdown required to assist in general cleanup of gelled fluids if the reservoir is depleted. Need to ensure gels will break for easier clean up. k. Minimal fluid loss is critical for a successful open hole water pack. Fluid loss can be more of an issue in depleted reservoirs and must be addressed. l. Friction loss in the shunt tubes becomes more of an issue with increased lateral lengths. Proper modeling can help to determine feasibility of APT in this geometry. m. Back pressure through the screen and washpipe assembly while circulating increases with interval length as the Beta wave progresses back towards the heel. With longer lengths, the potential is higher for exceeding fracture pressure while pumping. n. Between 55 and 75 degrees, beds of sand deposited along the low side of the wellbore can become unstable and suddenly fall down the hole in a concentrated slug that could lead to bridging across a high leak-off zone. o. A complete annulus pack can help to redistribute load from the screen thus increasing screen collapse resistance. p. Screen strength is critical where compaction / collapse is likely q. Remaining filter cake can cause production impairment, initially and over time. This effect should be addressed by screen selection and pack porosity (gravel pack) to allow flowback and/or chemical treatment. r. Screen slots/mesh and/or gravel pack sand must be carefully sized to allow the production of fines to prevent plugging. s. Install blank pipe across shale and silt sections of the wellbore. http://www.petrom.com 10-31 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL 10.3.2 Gravel Pack Design and Best Practices Workflow Applied in OMV Petrom This chapter will provide means to navigate through a logical sequence of steps to arrive at the most viable solution for each completion component. The following components will be addressed: • Gravel /proppant size selection • Gravel pack screen and washpipe selection • Carrier fluid selection Gravel Size Selection The first step in proper GP design is a selection of gravel size using PSD curve. The most widely used criterion for gravel sizing is the Saucier criterion. In a linear flow test cell Saucier carried out laboratory experiments to determine the optimal gravel to sand size ratio. From this work he concluded that the optimum ratio, i.e. the ratio which maintains the highest pack to formation permeability ratio and avoids sand production, is between 5 and 6. The Figure 10-20 depicts the relationship of the final and initial permeability ration (Kf/Ki) as a function of median gravel/median sand diameter (D50/d50) Figure 10-20 Results of Saucier’s Gravel Size Experiments The Y axis illustrates the normalized permeability of the gravel pack (1 = the initial gravel pack permeability). The X axis illustrates the relative size of the gravel vs. the formation sand. To the right of the graph, the gravel gets larger. The permeability is reduced due to invasion of the fines into the gravel matrix (see Figure 10-10 and Figure 10-11). As the gravel size gets larger the permeability is regained but at the expense of fines production. For a reasonable uniform sand, Saucier's results are logical as the median grain size is theoretically smaller than the pore throats of the gravel pack (assuming a hexagonal packing mode). Hence the gravel acts as a filter for the formation sand. The gravel invasion process by formation sand is a function of the pack structure of the gravel because in situ packing conditions will differ from controlled laboratory conditions, the pack permeability versus grain size ratio could deviate from the data reported by Saucier. Even under controlled laboratory conditions, small amounts of formation sand were produced continually, independently of the gravel size used. This observation indicates that finite sand production is inherent in gravel packs and this is confirmed by field experience. Saucier's experiments were carried out with clean sands with low fines content. Saucier criteria D50 must be optimized to achieve maximum gravel pack sand permeability, yet still maintain sand control as shown in Figure 10-21 and Table 10-10 10-32 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Figure 10-21 Optimization of Gravel Pack Sand Table 10-10 Criteria for optimization of gravel size Ratio Dg50/ Df50 5 5 to 7 7 to 9 >9 Notes Good sand control, but restricted flow due to low gravel permeability. Good sand control and maximum pack permeability. Good sand control, but restricted flow due to formation sand Invasion of gravel pack sand. No sand control, formation sand passes through gravel pack sand. This chart below (Figure 10-22) shows the limitations of the Saucier criteria when comparing two sands of different uniformity. Therefore more elaborate design criteria have been developed. Figure 10-22 Uniform (A) and Non-uniform (B) sand The almost vertical curve A in Figure 10-22 represents a highly uniform sand and well sorted, whereas curve B with the lower slope indicates a non-uniform and poorly sorted sand because of the wide distribution in particle sizes. This chart shows the limitations of the Saucier criteria when comparing two sands of different uniformity, therefore more elaborate design criteria and relationships have been developed which can be used to select optimum gravel size and they are summarized in Table 10-11 http://www.petrom.com 10-33 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL Table 10-11 Gravel size selection according to various authors SAUCIER COBERLY SCHWARTZ STEIN GILLESPI at al KING For 5 > SC > 25 5Dg50= (5-6)Df50 Note: Used in OMV Petrom Dg10=10x Df10(largest 10%) IF SC < 5 then use Dg10=6xDf10 or IF <10 SC > 5 then use Dg40=6xDf40 or IF SC >10 then use Dg70=6xDf70 Dg85= 4xDf85 IF SC < 2 then use Dg50=6xDf10 or IF SC ~ 2 then use Dg40=6xDf40 or IF SC > 2 then use Dg30=6xDf30 IF SC < 5 then use Dg50=9xDf10 or IF SC (5-15) then use Dg50=8xDf70 or IF SC (15-25)then use Dg50=7xDf50 or IF SC > 25 then use Dg50=6xDf50 If the reservoir is heterogeneous and consists of the layers with various properties, each layer could require different gravel sizes. The smallest gravel size should be selected and used. OMV Petrom uses Saucier’s method to select gravel size. Based on accumulated knowledge, field experience and sand samples analysis (PSD), OMV Petrom has been decided to use the following gravel sizes as shown below. Gravel Size (US mesh, mm) Oil Wells Standard Special Cases 20-40, 0.85-425 16-30, 1.18-0.6 Gas Wells 30-50, 0.6-0.3 The specification of gravel pack sand size of the most frequently used in OMV Petrom according to API RP 58 is shown in Table 10-10. Table 10-12 Recommended Practices for Testing Sand used in Gravel Packing Operations Screen Selection Screen selection is very important in successful gravel packing completion. Screen acts as a filter to keep gravel in position after placement. Screen selection is composed of screen length, screen size (O.D.), screen wire spacing/slot size and screen type. For the design point, the selection of blank pipe and wash pipe are always linked with the selection of screen in gravel packing design. Screen Length Screen length should be sufficient to extend above and below open interval-interval/s. Some companies use a minimum of 6 m of overlap on the top of the interval when low density GP is used. Lessons learned from results of these applications confirmed that, in some cases, a long screen was 10-34 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 2012 10. SAND CONTROL detrimental due to screen erosion immediately prior to screenout. Upon coverage of the perforations at full pump rate, high velocities can occur for a brief period just prior to screen coverage causing screen damage and unsuccessful GP operation. The accepted practice in OMV Petrom is that length of screen should provide overlapping above and below open interval/s of minimum 1.5 m. In the case that more intervals are opened, the distance between lowermost and uppermost should be used to determine the length of a filter. This general rule is valid for the vertical and slightly deviated wells. The overlap above the top interval increases with increase of the well deviation angle above 50 degrees and recommended practice workflow is shown in Figure 10-23. Screen Size (O.D.) Radial screen clearance of >=25 mm is a rule of thumb number that will help maintain sand control and provide optimum fishing conditions for subsequent removal. Upper zone screens must have an inside diameter (ID) to accommodate concentric tubulars to access the lower zones. The screens often have smaller radial clearances making small casing completions very challenging. These tight radial clearances make annular gravel placement more difficult. Screens are often sized so they can be conveniently made up to the sump packer seal assembly and the blank pipe without the need for a crossover. This can reduce considerable expense. Screen size should satisfy the following criteria in the following order: • On upper settings of multi-zone completions. The screen I.D. must accommodate concentric tubulars for the lower zones. • Should be easy to wash over during fishing operations. (>=25 mm of radial clearance). • Should be easy to pack the annular area • I.D. should accommodate wireline tools. (Typically > 50mm/1.995" I.D. [60.3 mm /2 3/8" Base Pipe]) • When convenient, the screen should screw together with blank, and seal assemblies with minimal crossovers. The recommended OD for standard screens used in OMV Petrom (Stimpex) are shown in Table 10-13. Table 10-13 Screen OD – OMV Petrom Best Practice mm inch inch mm Screen Centralizer OD mm 127 139.7152.5 168.3 177.8 219.1 5 5 ½ -6 1.9 2 3/8 58 70 100 110 6 5/8 7 8 5/8 2 7/8 2 7/8(3 ½) 5½ 83 83 (100) 150 135 135(148) 190 Casing OD Base Pipe OD Screen OD Screen Slot Size The screen aperture should be the largest size that stops all of the gravel from passing through, generally no larger than 75% of the smallest gravel diameter. For a wire-wrapped screen, this is relatively easy. In any case, this rule of thumb needs to be validated with laboratory testing to ensure that the screen works in combination with the selected gravel. An absolute stoppage criterion (i.e. http://www.petrom.com 10-35 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL slot size smaller than smallest gravel size) has to be used to ensure the gravel is kept in place, while keeping the inflow large enough to avoid a rate limiting pressure drop over the screen, as shown in Figure 10-24. For pre-packed, sintered and mesh screens the mesh or pore sizes should be designed according the absolute stoppage criterion. The recommended wire spacing (Δ) is about 50-70% of the minimum grain diameter as is indicated by equation: ∆= (𝟎. 𝟓 𝒕𝒐 𝟎. 𝟕 ) ∙ 𝑫𝒈𝒎𝒊𝒏 . For the most frequent gravel size in OMV Petrom, the recommended screen slot size is shown in Table 10-14. Table 10-14 Screen slot size in OMV Petrom Gravel Size mm(mesh) 0.6 -0.3(30-50) 0.8 -0.4(20-40) 1.18-0.6 (16-30) Maximum recommended screen slot size mm inch 0.2 0.008 0.3 0.012 0.5 0.020 Screen Design Type There are three basic types of screen: standard screen, pre-packed screen and wire mesh / sintered metal (premium). Standard screen is normally used in vertical wells or less degree deviation wells gravel packing completion with different gravel placing technique to prevent formation sanding problem. Prepacked screens consist of two concentric screens packed with resieved silica sand (either resin coated or conventional). The wire mesh screens contain alternating layers of sintered metal and wire mesh. The pre-pack screens and wire mesh screens are generally utilized as insurance for a gravel pack failure in adverse conditions such as open-hole and/or long deviated intervals OMV Petrom uses wire-wrapped screens manufactured by STIMPEX Company under QA/QC guidelines and technical specifications defined by OMV Petrom. The main characteristics of STIMPEX screen are specified in Table 10-15. To avoid premature failure caused by erosion and corrosion problems it is obligatory to assure proper metallurgy for anticipated reservoir fluids and conditions. Additionally, to reduce negative impact of corrosion, it is recommended to use screens with plastic centralizers which are corrosion resistant and can be milled easily. The common practice is to use two screens as part of downhole equipment. The production (main) and control screen downhole configuration depend on which GP placement is selected and the type of carrying fluid used for GP placement. OMV Petrom has been using both screens as proven best practices. The control screen is positioned above the main screen because the carrying fluid is of low viscosity and low concentration brine and the reverse circulation method using a crossover tool is the applied placement technique. If the total length of perforated interval is less than 6 m then a control screen is not required and the selected length of the production screen should be increased by about half the length of perforated interval. This is common practice in OMV Petrom. Table 10-15 Production (Main) Screen STIMPEX duplex type technical details Screen Base Pipe OD, inch 1.9 2 3/8 2 7/8 Material Stainless steel DUPLEX 2205 DIN#1.4462 Wire Wrap OD, mm 58 70 83 Material Stainless steel DIN#1.4462 (AISI 321) Centralizer Diameter mm 100 110 135 Manufactured length of Screen m 2, 4.5 and 6* *The length of screens provided by various foreign providers are in the range from 3 to 9 m. Standard length of control screen type STIMPEX is cc 2m (6 feet). 10-36 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Figure 10-23 Gravel Pack Design Workflow in Petrom OMV http://www.petrom.com 10-37 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL Figure 10-24 Inside casing GP solution Gravel –Pack Design Requirements In order to properly plan the execution of a gravel pack operation a specific volume of slurry is required to be pumped into the well. The minimum calculations needed for planning and execution gravel-pack operations are: 1. Total Gravel Volume (VTg) 2. Gravel-Pack Fluid Volume (VgpF) 3. Slurry Volume (Vs ) 4. Displacement Volumes (Vdisp) Total Gravel Volume The gravel volume calculation assumes that when particles are at well downhole they occupy volume equivalent to their bulk density at the surface. The required gravel volume is: 1. The perforation-tunnel volume for a cased-hole pack and sand washed out volume of formation. The volume varies as a result of interval characteristics; sanding time and volume produced in certain period of time and should be estimated using recorded sand production volume/mass. Practically, the volume/quantity of sand needed for injection in the productive formation should be calculated based on the experience in sand control at the offset wells. 2. The annular volume (m3, ft3) between the casing below the packer or openhole and tubular pipes (screens and blank pipe). 3. Required volume of the gravel above screen. 1. Required Volume of Gravel across Perforated Sections 10-38 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL This is the estimated volume gravel (m3/m, ft3/ft) to fill the perforations and the void space behind the casing created by the perforation cleaning operation. Using the data in Figure 10-25, the rule of thumb for determining the gravel volume per unit length (m,ft) of perforated interval is: • New Zones (good, clean formations): 0.0465 m3/m (0.5 ft3/ft) o • • 3 3 Minimum gravel volume is 0.7 m (25 ft ) New Zones (dirty, low-permeability formations): 0.14 m3/m ( 1.5 ft3/ft) Recompletions (formations that have produced sand): 0.14 m3/m ( 1.5 ft3/ft) Figure 10-25 Volume of the gravel per length of perforated interval Usage of 0.7 m3 (25 ft3 ) as the minimum gravel volume in good, clean formations yield a larger volume than that indicted in Figure 10-25, but includes lost slurry volume in surface equipment. The following factors will affect the amount of gravel squeezed into the formation: • Screenout, preventing further injection, is highly dependent on permeability. In clean, permeable formations, dehydration of the slurry will occur earlier thusly, reducing gravel requirements. In dirty, low permeability, zones, fracturing may occur (increasing gravel volumes). In the latter case, a screenout may only be possible by using a low-viscosity carrier fluid. • Long zones, particularly those with high-permeability streaks, require less gravel per ft than shorter intervals because more area for dehydration is available. • High-permeability streaks at the top of long intervals may cause bridging and early screenout. Using defined rules, required volume of gravel for perforation and formation, equal to: Vgper = V perf (volume of perforation per unit length of perforation) X Lperf (length of perforated zone) + Vfor (volume of sand washed out formation) As the sanding time is usually difficult to estimate and as there are not continuously recorded volume of the produced sand during the time, the practical data collected during wash out intervention ( Vswo - average volume/mass washed out and cleaned) as well as the number interventions (Nintwo), an average washed sand from formation is: Vfor = Vswo x Nintw http://www.petrom.com 10-39 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL As during intervention it is much easier to record the length of sand plug accumulated in casing, annulus (Lsp), Vswo is: Vswo = 0.785x(Dic2 – Dto2)x Lsp Knowing the geometrical parameters of perforation from perforating program (shoots/m, perforation hole diameter and penetration depth – service data) the total volume of perforation is: Vperf= Nperf (shoots/m) x 0.7854xDperf2 (Perforation Diameter) x Lperf (Average Perforation Length ) 2. Required volume of gravel for casing Screen Annulus The gravel volume required to fill the annulus between the sand screen (main and control) and the casing from the bottom of the gravel to the top of screen (VgSA) is equal: VgSA = Van (annulus volume per unit length of perforation) x Ls (total length of screen/s) Blank-pipe and gravel-reserve calculations The minimum blank-pipe length required for a gravel pack (whether high-gravel concentration, circulation-squeeze or squeeze gravel pack with low gravel concentration) should be selected to ensure that the screen will be covered with gravel (after settling) if a premature screenout occurs. In producing wells, reserve gravel also prevents gravel fluidization during production. It is necessary to determine the length of pipe required to ensure coverage of the productive interval plus approximately 6 to 9 m (20 to 30 ft) of reserve gravel above the interval. The model of calculation is based on the settled gravel height taken as though none of the slurry had dehydrated. The length of blank pipe required is affected not only by the gravel concentration but also by the screen length. Both cases, cased and open – hole are considered. Cased Hole MBPLCH = (one JOINT) + [Ls (1-GSV)]/GSV Where: MBPLCH = minimum blank pipe (cased hole), m (ft), one JOINT = one joint blank pipe, 6 to 9 m (30 to 40 ft), GSV = gravel settled volume, fraction of slurry. The one JOINT is optional, and is generally omitted if experience in a given area justifies this elimination. Openhole MBPLOH = [(one JOINT) +Ls (1-GSV ) (OHD 2 - SOD2 )]/ [GSV (RGHD2 - BPOD2)] Where: MBPLOH = minimum blank/blind-pipe length (openhole), m(ft), OHD = openhole diameter, mm, (inch), SOD = screen outside diameter, mm, (inch) RGHD = reserve-gravel hole diameter, mm, (inch) 10-40 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 10. SAND CONTROL BPOD = blank-pipe outside diameter, mm, (inch) Once the length pipe of blank pipe is determined then volume of gravel to fill annular space between blank pipe outside diameter (OD) and casing inside diameter (ID) is equal: VgBP =VanBP*MBPL (CH or OH), where: VanBP – Volume of unit length of annular space between blank pipe and casing Settled Volume GSV = G/F (GBV)/ [1 + G/F (GAV)] where G/F = gravel to carrier fluid ratio, kg/lit (lbm/gal), GBV = gravel bulk volume, lit/ kg (gal l/bm), GAV = gravel absolute volume, lit/ kg (gal l/bm), Values of GSV as a function of concentration in kg/lit (lbm/gal),of carrier fluid are shown in Figure 10-26 for regular gravel. Figure 10-26 Gravel settled volume (SI and API) Total Volume of Gravel The total volume of gravel required is sum of the previous calculated volumes: VTg= Vgper + VgSA + VgBP Gravel-Pack Fluid Volume VgpF (Gravel-Pack Fluid Volume)= VcFs (Carrier-Fluid Volume for Slurry)+ Vpr (Prepad Volume) + Vpp (Postpad Volume) + Vex (Excess Volume) http://www.petrom.com 10-41 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL Slurry Volume If gravel concentration (Cg) and bulk density (ρg) are known then using the previously calculated gravel volume (Vg carrier volume) carrier fluid volume (VcF) is defined as follows: VcF (Carrier Fluid Volume)= ( Vgxρg)/Cg Then, slurry volume is: Vs= VcF (1+Vga*Cg) Where: Vga - Gravel Absolute Volume (l/kg, gal/lbm) is given for each type of gravel, as shown in Table 10-16. Prepad and Postpad Volumes General guidelines for selection prepad and postpad volume required for providing pumping schedule are: • Prepad Volume = Annular Volume + Washpipe Volume or 0.8 m3 (5 bbl), whichever is greater. • Postpad volume = 0.33 x Workstring Volume. Table 10-16 Gravel Absolute Volume . OMV Petrom is using gravel with bulk density 1600 kg/m3 what expressed in terms of gravel absolute volume is equal to 0.625 lit/kg or 0.07489 gal/lbm. Based on practical experience and data collected during long period of application of gravel pack, OMV Petrom has developed guidance for estimating required mass of gravel to pack unit length of tubing in various production casing, as shown in table below (Table 10-17) In order to assure enough reliability in executing GP operations the calculated mass of gravel should be increased by approximately 10%, as per OMV Petrom best practice. 10-42 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 10. SAND CONTROL Table 10-17 Required Gravel Mass per Unit of Tubing Length Casing OD Base and blind pipe’s OD inch 5 5½ 5¾ 6 6 5/8 7 8 5/8 inch 1.9 2 3/8 2 3/8 2 3/8 (2 7/8) 2 7/8 2 7/8 (3 1/2) 2 7/8 (3 1/2) Mass of Gravel per unit Wg/L Kg/ linear meter 13 14 16 18 (15) 21 26 (22) 55 (51) Displacement Volumes (Vdisp) The final step in calculation of gravel pack volume is to prepare various prepad and postpad displacement volumes as listed below: 1. Prepad at service tool = Workstring Displacement Volume (measured from start of prepad) = tubing/drill pipe capacity,( lit/m, bbl/ft )x depth ( m, ft). 2. Prepad at formation = Prepad at Service Tool Volume + Annular Volume, service tool to perforations 3. Slurry at service tool = Prepad at Service Tool Volume + Prepad Volume 4. Slurry at formation = Prepad at Formation volume + Prepad Volume 5. Slurry at lower telltale = Slurry at Service Tool Volume + Annular Volume, Service Tool to lower telltale 6. Postpad at formation = Slurry at Service Tool Volume + Total Slurry Volume Once the volumes for designing gravel pack are determined, then weight of gravel should be determined knowing gravel and carrying fluid density. The previously described model can be applied for technology of low density-low concentration gravel with circulation using crossover tool, for both cased and open-hole wells. As the technology of high density-high concentration gravel is not used in OMV Petrom, below is shown best practice workflow (Figure 10-27) recommended for eventual future use in horizontal, high deviated wells and slim hole wells. Selection of the appropriate fluid for placement gravel pack by using the high density –high concentration technology is described in the following section. http://www.petrom.com 10-43 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 10. SAND CONTROL Figure 10-27 Recommended Workflow for GP Design Using High Density-High Concentration 10-44 http://www.petrom.com 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Fluid Selection Carrier fluid used for gravel pack operations has three primary functions: • • • Transport the gravel to proper location, Provide fluid-loss through either screen or formation in order to allow pack to form, Flow-back from formation without reducing permeability. Use gel breaker for viscosified fluids. Proppant transport is dependent upon the following characteristics. • • • The ratio of the density of the carrier fluid to the density of the particle. When the fluid density = the particle density the particle will be suspended, The velocity of the fluid relative to the particle, The viscosity of the fluid. Often a fluid property that is desirable for gravel transport may prevent the fluid from flowing back from the formation. A gel breaker must be used to reduce the fluid viscosity before recovery from the formation. The most commonly used fluids for GP have been brine and hydroxy-ethycelluse gel (HEC). Gravel pack performed with brine carrier fluid is referred to as “water pack” or “conventional pack”, which is only used in OMV Petrom. The common practice for executing GP job is to use filtered field water with 3% of KCl. The recommended practice is to use filtered fresh water with 2% KCl which could help in decreasing the risk of corrosion. If the carrier fluid is brine (reservoir or salt water) then only the method of Low Density-Low Concentration (LDLC) can be applied (best practice in OMV Petrom), or if the carrier fluid is gelled brine, then the high density/viscosity-high concentration (HDHC) placement technique can be used. Comparison between HEC slurry pack and brine water pack carrier fluid is shown in the table below. Fluid Viscosity (mPas) Typical gravel concentration (kg/lit, lbm/gal) Typical pump rate (lit/min, bbl/min) HEC Gel 300-750 1.2-1.8, 10-15 160 -640, 1-4 Brine 1-2 0.12-0.36, 1-3 640-800, 4-5 The main objective of annular gravel placement is to pack effectively the annulus between the screen and the casing or the open hole. For cased-hole completions the added objective is to pack the perforations with gravel since the latter significantly improves well productivity and longevity. The main advantage is that the pumping rate can be slowed so that gravel and formation sand intermixing is minimal. Results of an application of high concentration slurry packing show that after operation with slurry the perforations were often not completely packed and voids in the annular pack were frequently the case. The use of HEC and other polymers was causing formation damage and permeability of the near wellbore zone to be reduced. http://www.petrom.com 10-45 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 10. SAND CONTROL In addition to perforation packing, the quality of the pack in the screen/casing annulus is important regardless of whether the well is completed open or cased hole. The gravel packs performed with viscous gel carrier fluids show the presence of large voids in the annular pack which, if not repaired, will result in formation sand production. Figure 10-28 is an example of wells gravel packed with viscous gel and then re-packed with brine due to voids in the initial viscous gel pack. The subsequent brine pack filled the voids. Pumping rate of carrying fluid and gravel depends on workstring internal diameter and numerous tests have led to empirical model which can be used for planning injection rate. QinjS (Injection rate of slurry)= 120xDit2, where Dit is inside diameter of the working string. When water pack technique is used, then fluid should be pumped at the rate in range from 300 to 800 lit-min (2 to 5 bbl/min). Quality check of the performed GP with water pack GP placement confirms that the annular packs were very tight and compact without undesirable voids. One of disadvantages of water packs is a high leak rate particularly in high permeability formations which can cause bridging in the screen/casing annulus and premature screenout of the treatment The selection of gravel-carrying fluid depends on the type of zone to be packed. The major distinguishing characteristics between the fluids are the base-fluid type, carrier fluid viscosity and temperature of application. Figure 10-28 Quality of Annular pack using brine and slurry pack 10-46 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL 10.3.3 Frac-Pack Design and Best Practices Workflow Applied in OMV Petrom Frac-Pack Technology “Frac-Pack” refers to a completion method that combines tip screen-out (TSO) hydraulic fracture stimulation with or without gravel pack pumped with the screen-blank packer assembly in place. The TSO fracture creates a short, highly conductive path that bypasses near well-bore damage with or without the screen assembly preventing proppant flow back, as it is shown in Figure 10-29. A Frac-Pack job conducted in poorly consolidated sandstone produces much shorter fractures than conventional hard-rock fracturing. Typical fracture lengths are around 15–30 m; in contrast hard-rock fractures typically extend more than 150 m from the wellbore. Figure 10-29 Frac Pac without/with Screen The-tip screenout fracturing (TSO) technique applies hydraulic-fracturing technology to create a wide, short fracture that yields high production rates with reduced pressure drop. TSO can be a highly effective technique in controlling sand and stimulating maximum production from weak formations. Ideal candidates for hydraulic fracturing with planned screenout include the following types of wells: • • • Wells that require a limited fracture size or a fracture that just bypasses wellbore damage. These may be wells with no boundaries for fracture-height restriction, wells with a nearby aquifer, injection wells, or slim holes spaced close together in a field. Formations that are not candidates for matrix acidizing. Reservoirs with moderate to high permeability (with or without formation damage, see Table 10-18 below). Table 10-18 Permeability classification • Wells that require restricted production rates for sand control (or otherwise need prevention from formation failure). http://www.petrom.com 10-47 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL • Wells that have been previously gravel packed and have lost production because of pore collapse and plugging of the gravel pack due to fines migration. Frac-Pack is a single step process of fracturing and gravel packing which provide the following advantages: • Effective sand control, • Frac packing is well suited to intervals with high fines contents. In some cases fines invasion will reduce proppant permeability. Some mitigation can be achieved by good initial proppant permeability and aggressive TSO treatments (high-width fractures). • Large increase of formation sand face area, • Reduced chance of fines migration, • Mechanical re-stressing of the near wellbore area, • Connection of laminated layers, • Larger proppant are used with 300 to 500% more conductivity than conventional gravel pack sand with adequate sand control, • Proven high probability of sustained low skin completions. Intervals close to water or gas contacts or intervals where cement quality is poor are not suited to Frac pack. In comparison to cased hole gravel packs, frac packs require more complex fluids, larger volumes, higher pump rates, plus the associated mixing and pumping equipment. Achieving TSO and packing the fracture with proppant are the most important elements of the technology. The process of Frac-Pack using TSO technology is shown in Figure 10-30. At every stage in the process, a realistic model of formation properties should be matched with those predicted/simulated and it is needed that wellbore hardware affects placement and the measurements being made to evaluate the placement. Figure 10-30 Tip Screen Out (TSO) Fracturing Process 10-48 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Figure 10-31 shows the deployment of a Frac-Pack and the resulting flow patterns. Where the permeability of the formation is low in comparison to the gravel, the fracture dominates performance and negative skin factors can result. The flow through perforations not connected to the fracture will be minimal and there is a reduced requirement to ensure that these perforations are clean. Turbulence and inertial flow effects become more important with Frac-Pack due to reduced flow areas through the perforations and higher rates. These non-Darcy effects (i.e. a rate-dependent skin factor) are dependent on the permeability of the gravel. Figure 10-31 Frac pack geometry and production behavior After perforating or re-perforating, surging perforations and running a screen and packer assembly, the production screen is latched into the plug and the packer is set. An acid treatment is spotted across the perforations to remove any existing damage and to provide good injectivity and packing proppant during frac operation. Following the acid treatment, step rate test and step down test are performed to calculate the closure stress and fluid efficiency. If it is possible a minifrac should be performed. Results from the two tests are used to calibrate the fracture model and a final treatment is designed. Frac-Pack should be designed for a tip screenout. Use surface annular pressures during job to identify the initiation of a TSO. Use observed pressure trends to adjust the pumping schedule. Extend final stages if TSO initiation is later than expected. Use a D50 of proppant to D50 of formation ratio of around 8 to 10 in sizing the proppant. Where possible this should be based on sand retention tests to avoid excessive fines plugging. The clearance between the screen and liner/casing increases the frictional pressure drops slightly and increases the screen out risk. A rule of thumb for the clearance between the casing and the screen is a minimum of 12 gravel D50. Always take returns on the annulus at the end of a frac pack to ensure a good annular pack. If screen out has not occurred, reduce rate after pumping 50% of the flush volume and take returns for the last 10 bbls of flush. If screenout occurs while pumping the Frac-Pack, bleed off annulus pressure and then add pressure to reverse out excess sand. http://www.petrom.com 10-49 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL The fluid should be designed to carry proppant during the pumping phase of the treatment. The fluid should contain enough breaker (dispersed and encapsulated) to break the gel within approximately 1 hour of pumping the treatment to minimize any residual damage to the formation and proppant. Design a frac workstring/tubing to minimize friction allowing for a higher treating rate at the maximum treating pressure. Check casing burst pressure below the packer and collapse of blank pipe and downhole tools to prevent burst/collapse at maximum rate proppant loading. It is preferable to start treatment with proppant concentration less than 150 kg/m3. After the treatment has been finished, the pump rate should be reduced slowly. It can be decreased abruptly only during flushing. It is important to keep pressure not higher than 100 -140 bar (1500 to 2000 psi) of net pressure during pumping. Planning Frac-Pack operations A successful Frac-Pack job requires a careful pre-job modeling to establish the necessary fracture height and length, and also requires a professional management team and their equipment at the wellsite. Pre-job planning draws on a range of data sources to produce a fracturing model. Using proper software tools for modeling of Frac-Pack operation is crucial step required to provide good understanding and on-time matching during job execution. Simulation and analysis should determine the stress profile in the pay zone and the surrounding rock layers. Because the results of the treatment hinge on producing a wide fracture, the rock mechanical properties, such as Young’s modulus, are very important. Fracture height is generally controlled by the stress field that exists within the target formation and the presence of rock barriers above and below it in the sequence. The injected fluid volumes and the fluid-loss properties of the injected fluid influence the fracture length that can be achieved. Every Frac-Pack job is tailored to the specific well conditions and designed to optimize well performance. The aim is to maximize hydrocarbon production by designing the most efficient pack. Analytical modeling also helps to reduce design time as operators seek to identify the optimal treatment conditions nevertheless of well type (vertical, slant or horizontal). It must be ensured that verified pressure is available so the limits for each job are known and the appropriate safety standards for the field are met. Frac packing is a technically demanding operation and it is important to perform it correctly. Attention should be paid to the details and it should be ensured that the design guidelines and proposed execution sequences are followed. The end results should be low-skin, high-performance completion. Even though Frac-Packs are much more robust completions than gravel packs, it is important that proper completion practices are followed. Material left in the wellbore as a result of drilling and cementing the well can cause serious damage to the Frac-Pack. Because the placement of the fracpack system involves pumping proppant-laden fluid between a screen and the casing, the scouring action of the proppant on the casing will mix any remaining material from drilling into the frac-pack fluids. 10-50 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Workover Best Practices 10. SAND CONTROL Frac-Pack Fluid Selection Frac-Pack fluid systems should have the following characteristics: • Low formation damage • Adequate proppant transport • Adequate leakoff to promote grain-to-grain proppant contact from the tip of the fracture back to the wellbore. • High retained conductivity in the fracture • Easily mixed and adaptable to various breakers • Reasonable unit volume cost • Low friction. High fluid efficiency or low leakoff are not as critical as fluids used in low-permeability, hydraulicfracturing treatments. Fluid-loss additives are seldom used in Frac-Pack because the jobs are designed for short propped length with tip screenout. In OMV Petrom, the most common carrier fluid utilized in frac packing are: • Filtered non viscous brine • Gelled water using various types of polymers (WGA 20, etc.) The design parameters encountered when choosing the correct fluid are as follows: • Formation conductivity (Kh) and fluid leakoff. Leakoff of a frac fluid depend upon the difference in the frac pressure and the pore pressure. In wells with a low BHP and a high Kh, the fluid must be thicker and more efficient. • Pipe I.D. Friction pressure can impact fluid performance due to the excess horsepower required to maintain proper pump rates. In the case of small ID work strings the recommended solution could be to use a delayed crosslinked system. • Temperature will affect the fluid performance. Breaker systems also depend upon temperature. Breakers must be tailored to accommodate the fluid temperature at the target. The breaker system must be aggressive as possible without compromising the particle placement criteria. Temperature also affects the polymer loading in the design. Hotter wells may need more polymer and cooler wells may require less polymer. Other carrier fluids used for Frac-Pack Frac-Pack fluid systems frequently used for executing jobs are: • Hydraxyethylcellulose (HEC) • Borate-crosslink guar/Hydroxypropylguar (HPG) • Viscoelastic Surfactant (VES) Borate-crosslinked guar, or HPG, has been used over a wide temperature range of 48-138 oC. Although the guar has more gel residue than HPG, studies show that pack damage is similar. To reduce tubular friction, service companies can delay the crosslink mechanism. Low polymer loadings, 3.6-4.2 kg/m3 (30-35 lb/1,000 gal), are used depending on formation temperature and permeability. Borate fluids are generally more efficient than HEC, but there has been controversy as to retained pack conductivity. Because Frac-Pack need short pump times and low fluid volumes, jobs can include much higher breaker loadings. This may help to prevent possible conductivity problems caused by borate fluids. http://www.petrom.com 10-51 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL Viscoelastic Surfactant (VES) is solids-free liquid gelling agent which develops viscosity when blended in light brines (at a gel concentration of 3 to 6% vol./vol.). This fluid provides the following advantages. • • • • • • High viscosity at low shear rates (good prop transport characteristics). High leakoff (high probability of a tip screenout). Low friction pressures. High return perm and conductivity values Not susceptible to bacteria attack. On-the-fly mixing capabilities The VES systems are highly recommended in zones that remain stagnant for a period of more than 7 days prior to cleanup and prediction. These systems are residue free. In single selective completions, where days or months go by before flowback, polymer systems will precipitate damaging materials. These systems are also utilized in situations where tip screenout are critical as in the case of short fracture half lengths (less than 5 m in length). This is desirable in the case of close proximity of water or whenever limited height growth is desired. The use of VES results in high leakoff at the fracture tip yielding a much higher probability of a tip screenout. VES is relatively more expensive (factor of 3) when compared with the HPG but it is important that the VES requires very little additives. There are no bactericides, breakers, demulsifiers, crosslinkers, buffers or delay agents. When considering a VES fluid, there is a significant advantage in logistical risk due to its simplicity. This alone can significantly offset the additional product expense. HEC, with varying polymer loading, has been used extensively because it is also commonly used in gravel packing in various locations all around the world. Although HEC exhibits most of the preferred characteristics, it has four major drawbacks: • It is a subject to viscosity reduction at higher temperatures. • If improperly mixed, it can result in microgels. • It exhibits high friction pressures as compared with delayed crosslinked fluids and VES (Viscoelastic Surfactants). This becomes a significant penalty in long and/or small ID tubulars. • HEC does not demonstrate proppant transport qualities as well as other fluids. The low shear rate viscosities [at < 1 sec"1'are not as high as the crosslinked VES. Frac Pack Job Execution Sequences The general job sequence progresses for Frac-Pack applications where mechanical sand control equipment is placed in the wellbore applied in OMV Petrom SA are: • • • 10-52 If the existing interval is reperforated in order to provide adequate perforations needed for Frac-Pack application (larger perforation diameter and more perforation holes), one must retrieve perforating guns from the well after perforating. Prepare the well for Frac-Pack operation (check well bottom, check casing ID, check the depths of casing couplings above the perforated interval/s in order to determine position of the packer and avoid eventually problem with packer sealing). It is mandatory to determine the depths of the minimum four casing couples above the top of open interval/s. Run the completion assembly into the hole (packer setting and sealing). http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL • • • • • • • • • • • • • • When on depth, set the gravel-pack packer and reciprocate the workstring to set the service tool in circulating position. Circulate completion fluid into the well to fill the annulus between casing and workstring with a fluid of known density. Shut in the annulus and position the valve so that fluid can be pumped down the workstring while monitoring annulus pressure. Pressure test surface injection lines and workstring up to 20% above referent test pressure (Preftest) . If maximum designed treated pressure (Ptrmax) is greater than hydraulic packer ball shear out pressure (Ppacker) then as referent pressure should be taken (Ptrmax), otherwise, Ppacker should be used as referent pressure. Test the reverse circulation line (commonly up to 100 bars). This pressure should be determined using increase pressure in annulus when work string reverse line is opened and casing reverse line is closed. In order to remove damage the well should be treated with adequate acid solution. Acid recipe for treatment is prepared using workflows for matrix acidizing treatment (see chapter 9). In the case of the gas wells, usually, for preflush and main treatment, beside additives to prevent corrosion, emulsion, iron precipitation, methanol can be added. To avoid problem with sludge forming in oil wells, prior to acid solution injection, preflush nearwellbore zone with mutual solvent (commonly xylene is used) is preferable. Acidize the well with prepared acid solution. Acid injection line should be isolated of the sand injection line. Inject the acid solution with injection rate in the range of 250-500 lit/min and displace acid solution with prepared carrier fluid. After displacing acid and removing the product of acid reaction, perform step-rate (up) test. Perform the step-rate test (SRT) by pumping carrier fluid. The step-rate test should pump a pressure high enough to exceed the formation fracture gradient. The required number of test point should be 10. The first injection rate and subsequent rate during SRT should be determined using injectivity test data. A friction-reducer additive may be necessary to reduce wellhead pressure while pumping higher rates. Shut down the pumps and allow the pressure to return to near-initial reservoir pressure. Evaluate the step-rate test to determine the fracture extension pressure and rate. The SRT will determine the upper limit of closure pressure. Redesign the fracture treatment as per minifrac and step-rate test results. It is recommended to perform a minifrac test by pumping the proposed fracturing fluid at a constant rate. A step-down test can be performed as part of the minifrac test to determine whether any fracture-entry restrictions are present. If minifrac is not performed then stepdown-test should be done. If minifrac test is executed then load Step Rate Test (SRT) fluid with breakers to assist breaking minifrac gels. Step rate fluid can be used to displace minifrac fluid. Perform minifrac enough long to contact most of the height of the zone(s) being treated (typically 10 minutes at Frac-Pack rate using frac pack fluid). Displace the minifrac test fluid to the top perforations leaving service tools clear of gel. After pumping the minifrac, use pressure falloff data/Step down test to calculate fluid efficiency and minimum closure pressure http://www.petrom.com 10-53 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL • • • • • • • • • • Calculate the fluid-leakoff coefficient, closure pressure, closure time, fluid efficiency, and friction pressure. Refer to Chapter 11 for the procedures involved in determining these coefficients and pressures. Design a propped-fracture treatment that optimizes pumping rate, pad volume, and proppant schedule. Perform the tip-screenout fracture treatment until screenout occurs or until the volume needed to form an annulus pack remains in the workstring. Once pumping begins at full design rate, a fracture is initiated with carrier fluid (pad), commonly a filtered water or gelled water using polymer that has a low to modest fluid efficiency (between 10% and 30%). Injection proppant slurry, typically starting at 60-120 kg/m3 (0.5 or 1 ppg) with stages of increasing proppant concentration up to 350 to 600 kg/m3 (3 – 5ppg). Fracture growth stops when the proppant screens-out at the fracture tip. Continued pumping at a rate greater than the fluid leak-off rate will result in a continual treating pressure increase. Fracture width increases with increasing treating pressure after a TSO has been established. After a TSO is evident, proppant is displaced (flushed) to near the GP service tools (approximately 1 m3) and pump rate is slowed to enhance packing of the fracture. With displacement rates below 1 m3, full returns are taken during the final 1.5 m3 of flush to facilitate a good annular pack. Slow the pumping rate to 160-320 lit/min (1-2 bbl/min ) and open the annulus valve through a choke. This choke allows the proppant pack to be dehydrated across the screen, forming an annular pack between the casing and screen. Shut down the pumps when maximum pressure is achieved. Observe the pressure bleed-off. Re-stress the pack until a tight annulus pack is achieved. A “top off” gravel pack can be added, if necessary. Reciprocate the workstring to select the reverse position on the service tool. Reverse any excess slurry from the workstring. Retrieve the workstring from the hole and run the production tubing and assembly into the well. Clean up the well slowly to allow the gravel pack to stabilize. Put the well into production by running in hole the required production equipment depending which method will be used (flowing, SRP, ESP, PCP, Gas Lift) Frac-Pack–Design and Execution detailed workflow developed by using the analyzed cases in OMV Petrom SA is shown in Figure 10-32. 10-54 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Figure 10-32 Frac-Pack design and execution workflow http://www.petrom.com 10-55 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 10. SAND CONTROL Figure 10-33 Frac-Pack design and execution workflow (Continuation) 10-56 http://www.petrom.com 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Figure 10-34 Frac-Pack design and execution workflow (Continuation) http://www.petrom.com 10-57 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 10. SAND CONTROL Figure 10-35 Frac-Pack design and execution workflow (Continuation) 10-58 http://www.petrom.com 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Figure 10-36 Frac-Pack design and execution workflow (Continuation) http://www.petrom.com 10-59 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL Frac-Pack Post-job analysis The importance of analyzing pressure data during a minifrac has already been promoted. The main frac performance can also be analyzed using annular pressure or downhole memory gauges. The net pressure gain during a treatment, indicative of the degree of fracture width achieved, is generally determined and reported. Radioactive tracers and temperature gauges/surveys can determine fracture propagation and vertical height growth. Care must be taken with any Frac-Pack well to isolate the effects of ratedependent skin, fracture transients, deviation (negative) skin and skin caused by perforating, fracture and gravel packing. For example, if the rate reduces over time as the fracture pressure transients progress to pseudo steady state, the rate-dependent skin factor will reduce and it could appear that the fracture is cleaning up. Trying to isolate the effects of change and therefore improve requires data – pre and post job . Obtaining this data is frequently undervalued. With this data, we have a better understanding of the well behavior and we have a better chance of achieving the established production goals. It is strongly recommended to acquire as much as possible data after job execution in order to allow proper planning of the Frac Pack jobs for the next candidates wells. 10.4 Gravel Pack Operational Aspects Gravel packing (especially cased hole) has the potential to create severe formation damage and productivity impairment if proper procedures are not followed. Gravel packs are complicated and challenging completions that require attention to details: • Compatible fluids • Clean fluid handling systems and clean wellbore • Filtered completion brine • Clean perforations of sufficient size and number • Proper gravel quality and size • Proper gravel placement The job is successful only if sustainable maximum productivity is achieved after the well has been completed. Cased hole gravel packs are extensively used in OMV Petrom and this method have been passing through continuous improvement of patented downhole equipment (mechanical packers type HOVA and PIROM-MOCA) and quality of the services. Open-hole water pack gravel placement technology is not used in OMV Petrom. Eventual drilling of the new wells which could be completed as open hole potentially can be candidate for OHGP application and some practical directions based on industrial recommended best practices will be considered at a later date. The method of water pack (LDLC) refers to a completion method that utilizes a crossover tool and wash pipe to squeeze proppant into the perforation tunnels with a non-gelled completion fluid. In wells >30o, high pump rates and low circulation rates (160-320 lit/min, 1-2 bpm) are established to assist transport of proppant to the bottom of the well while fluid loss to the formation carries proppant into and packs the perforation tunnels. Cased and open holes gravel packs are similar. The pumping rates are also similar. It is desirable to be able to squeeze and circulate. Pure circulation will lead to the perforations not being packed. Squeezing can be achieved by restricting the return flow, for example, by closing the BOPs. For long 10-60 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL intervals however, circulation will assist in getting the gravel to the toe of the interval. There is a limit to the length of the interval that can be treated in one step. Usually, in OMV Petrom the lengths of open intervals are less than < 75 m (250 ft ) Sometimes carrier fluid should be pumped at the highest rate possible to help ensure a tight annular pack and maximize filling of perforation tunnels. This technology is called High Rate Water Pack (HRWP). Usually, fluid should be pumped below fracture pressure, but in certain cases fluid can be pumped at or slightly above fracture pressure to break through near wellbore mechanical and perforation damage. In all cased hole gravel packing techniques, if perforation tunnels are not cleaned up after perforating with adequate underbalance and/or surging, fluid may not be able to leakoff into the formation and the perforation will not be packed. Unpacked perforations result in sub-optimal completion deliverability. The absence of suspension properties of the water carrier fluid allows gravity to assist in the packing process in wells with completion deviations of less than 60 degrees. Greater returns are required in deviated wells greater than 60 degrees to prevent bridging in the annulus resulting in gravel pack voids. The use of water also eliminates any potential for gel damage as long as Lost Circulating Materials (LCM) pills are avoided after gravel packing. Water packing can produce low cost, highly efficient completions. The tool and accessories for gravel-pack treatments either remain in the well (completion tools) or are run and retrieved before the production tubing is run (service tools). 10.4.1 GP Workstring/Service Tools Gravel pack service tools are defined as the equipment necessary to perform the gravel pack, but which are removed from the well after gravel packing. In most cases, the service tools required for a gravel pack are dictated by the type of gravel pack equipment being used. Service tools: • • • • • • Setting tool Cross-over tool Reverse ball check valve Retrieving tool Wash pipe Shifting tools Setting Tool The setting tool is basically a hydraulic piston that generates the force required to set the gravel pack packer (see Figure 10-37). It is attached to the top of the crossover tool and has a sleeve shouldered against the setting sleeve of the packer applied pressure to the workstring acts on a piston in the hydraulic setting tool to force the sleeve down to compress the slips and packing element of the packer. The setting toll is equipped with an adapter sleeve and with a setting ring to be able to cover all range of packer size (see Appendix 10- A to Appendix 10- E). The maximum operating temperature is 120 oC. The setting toll is reusable after replacement and maintenance of used elements. http://www.petrom.com 10-61 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL Figure 10-37 Hydraulic Setting Tool Cross-over tool The gravel pack crossover tool creates the various circulating paths for fluid flow during the gravel packing operation. It consists of a series of molded seals surrounding a gravel pack port midway down the tool and a return port near the top of the tool (see Figure 10-38). A concentric tube design in the crossover tool along with the gravel pack packer and gravel pack extension allow fluid pumped down the workstring above the packer to “crossover” to the screen/casing annulus below the packer. Similarly, return fluids flowing up the washpipe below the packer can “crossover” to the workstring/casing annulus above the packer. Figure 10-38 Gravel Pack Crossover Tool 10-62 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL The crossover tool ensures the sealing inside the packer bore and sliding sleeve at minimal pressure of 250 bars. It allows circulating the slurry of gravel and carrier fluid to the maximum concentration of gravel of 500 kg/m3 and injection rate to 1400 lit-min. mechanically, the crossover tool carries the weight of the gravel pack assembly into the well via a left hand square thread connection to the top of the gravel pack packer’s seal bore. The crossover tool support does not allow any drop sand inside the screens during the upward movement, to reverse circulating position of the service tool. All parts of crossover toll, except the sealing elements, which are in contact with GP sand are abrasive resistant in order to be able to allow injection of the least 10t of sand/ operation without damaging the bypass crossover sub ports. The crossover tool also contains the ball seat to allow pressuring of the workstring to set the packer. After setting the packer, workstring pressure is increased to blow the ball into a sump area below the gravel pack ports of the crossover tool. At this time the crossover tool can be released from the lefthand square thread of the packer. Crossover tools are supplied with either a rotational mechanical release or a hydraulic release. The mechanical release requires 10 to 12 rotations to the right at the packer with slight upstrain. The hydraulic releasing mechanism is actuated by pressure in the workstring/casing annulus. The mechanical release may be used as a backup to the hydraulic release. To assure reliable operation crossover toll is able to allow the use of the secondary setting ball in case of failure of the first one. Also, it should be allowed independently pack of control and main screen. The sealing elements can withstand the maximum operating temperature up to 120 oC. Gravel pack crossover tools have three positions - squeeze, circulating, and reverse circulating as illustrated in Figure 10-39. The squeeze position is found by setting down weight on the packer to seal the return ports in the packer bore. The squeeze position allows all fluids pumped down the workstring to be forced into the formation and is used to perform squeeze gravel pack treatments and/or inject acid treatments into the formation. The circulating position is located by picking the crossover tool up approximately 0.5m (20 inches) above the squeeze position. The circulating position works in conjunction with properly sized washpipe to provide a flow path to circulate gravel pack sand to completely fill the screen/casing annulus. The flow path is down the workstring, into the crossover tool, out the gravel pack extension, down the screen/casing annulus, into the screen, up the washpipe, into the crossover tool again, and up the workstring/casing annulus. Shifting Tool The shifting tool is run below the gravel pack crossover tool and is used to open and close the sliding sleeve in the gravel pack extension. The tool is basically a collet designed to catch the fingers of the sliding sleeve and shift it closed with upward movement or open with downward movement. The shifting tools allow the rotation of the setting tool, crossover toll and washpipe, if it is required. The top thread of shifting tool is the same with crossover thread. The bottom thread of the shifting tool can be connected to the following size of wash pipes 1.315” Hydril CS used for downhole assemblies in casing 5 ½” – 6” and 1.66” in casing 6 5/8” to 7”. The shifting tool is only required if running the gravel pack extension with sliding sleeve. http://www.petrom.com 10-63 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL Figure 10-39 Gravel Pack Crossover Tool Positions Wash pipe Washpipe is run below the gravel pack crossover tool or shifting tool inside the blank pipe and screen to insure that the return circulation point for the gravel pack carrier fluid is at the bottom of the screen. This assists in getting gravel pack sand to the bottom of the screen and packing in a bottom up fashion. The end of the washpipe should be positioned as close to the bottom of the screen as possible. Increasing the washpipe OD increases the resistance to flow in the washpipe/screen annulus. The greater resistance to flow forces the gravel pack carrier fluid to flow in the screen/casing annulus and carry the gravel pack sand to the bottom of the well. By accomplishing this, gravel packing of the screen/casing annulus is more complete. Based on the experiments, the optimum ratio of washpipe OD to screen base pipe ID should be approximately 0.8. Achieving this ratio in some screen sizes will require the use of special flush joint washpipe connections. Table 10-19 shows the recommended OD diameters for washing pipes for different types of mechanical packers used in OMV Petrom (HOVA C and PIROM MOCA H). Also shown are the different types of threads that are used . They can be either type Hydril or TBG (ISO 10422). If the thread of the screen base pipe is not type HYDRIL, the washpipe can be replaced with washpipe of the same diameter pipe, and TBG thread. A cross tool is required in order to change from HYDRIL thread to TBG thread. 10-64 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 10. SAND CONTROL Table 10-19 Washpipe diameter for mechanical packers used in OMV Petrom Packer PIROM MOCA H Packer HOVA C Base Pipe OD Wash Pipe OD inch inch 1.9 2 3/8 2 7/8(3 ½) 5½ 1.05 1.315 1.66 1.66 Thread Type TBG HYDRIL HYDRIL HYDRIL Base Pipe OD Wash Pipe OD inch inch 1.66 4 4 5½ Thread Type 1.66 HYDRIL(TBG) HYDRIL(TBG) 1.66 HYDRIL(TBG) 10.4.2 Gravel Pack Completion Tools Currently Used in OMV Petrom Completion tools: • Gravel pack packers (Mechanical – currently used Type HOVA C, PIROM and MOCA-H and Hydraulic type Baker 70 B-32 or another) • Extensions with sliding sleeve • Shear out Safety Joint • Blank pipes (upper and lower) • Sand screen (Production and Control Screen) • Seal Assembly Packers used in Gravel Pack operation At the top of the gravel pack assembly there is a gravel pack packer. This packer may be permanent or retrievable. All packers (mechanical and hydraulic) used in OMV Petrom are retrievable type packers. Because gravel packing is a complex completion operation, failures during initial gravel placement or during the life of the reservoir can occur. A retrievable packer expedites workover activities without the potential cost and risk of milling a permanent packer. The retrievable packers used for gravel packing are seal bore type packers such as the Model “SC-1” Packer (Figure 10-40). In addition to facilitating gravel pack operations the packer can be used for production; therefore, the packer must be designed for the temperature, pressure and environmental conditions present in the well. This packer is capable of withstanding differential pressures up to 400 bar and temperature up to 120 oC. The maximum expected pressure differential pressure in OMV Petrom is 250 bars. A hydraulically operated interlocking device, incorporated into the setting sleeve, preventing the pre-setting of the packer during run-in. The packer is set with a hydraulically actuated setting tool with no rotation required. Single cup forming packing element requires milling to eliminate metal spacers. The packer is released and retrieved with retrieving tool using a simple straight pull. Packer SC1 can be used for testing of the annular space, if it is needed. If in the future would be required to install GP equipment in the well having higher temperature in the range of 120 -230 oC and higher pressure > 400 bar, then other packer model (SC-2, HP1 etc.) with more sophisticated packing elements and more rigorous material specifications can be used Details and technical specifications of various packers are shown in Appendix 10- A to Appendix 10- E. http://www.petrom.com 10-65 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL Figure 10-40 Hydraulic Retrievable Gravel Pack Packer Model “SC-1” Gravel Pack Extensions Gravel pack extensions are used in conjunction with the gravel pack packer and service tools to provide a flow path from the tubing above the packer to the screen/casing annulus below the packer. The gravel pack extension consists of the upper extension (which contains flow ports for the gravel pack fluids), seal bore (sized to match the bore of the gravel pack packer) and lower extension (to house the gravel pack crossover tool throughout its range of motion). The length of the gravel pack extension is carefully designed to work with a particular gravel pack packer and crossover tool. Gravel pack extensions are available in two types, perforated and sliding sleeve (Figure 10-41). In a perforated gravel pack extension, the upper extension simply has drilled holes for fluid exit. These holes should be isolated during the well production with a seal assembly as a precaution to prevent any gravel production. In a sliding sleeve gravel pack extension, the holes in the upper extension are open during the gravel pack but isolated with a sliding sleeve that is closed by a shifting tool when the gravel pack service tools are pulled out of the well. 10-66 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Figure 10-41 Gravel Pack Extensions Shear-Out Safety Joint A Shear-Out Safety Joint (SOSJ) consists of a top and bottom sub connected by a number of shear screws (Figure 10-42). This device is incorporated in most gravel pack completion assemblies to allow retrieval of the gravel pack packer and extension independently of the blank pipe and screen. The SOSJ is parted with straight tension to shear the screws while pulling the packer with the packer retrieving tool. After removing the packer, the blank pipe and screen may then be washed over and retrieved using routine fishing techniques. If a SOSJ is not run, the blank pipe below the packer must be cut to allow retrieval of the packer. The shear pins used in the SOSJ must support the weight of the blank pipe and screen with a generous safety factor. The limitations of the workstring that will be used to retrieve the packer should also be considered when selecting a shear rating. Standard shear ratings are adjustable between 15 to 25 t (44,800 and 80,640 pounds) depending on the size of the tool. The top and bottom subs are rotationally locked to allow torque transmission if required. SOSJ’s are not normally used when running permanent style gravel pack packers or when running extremely long and heavy gravel pack assemblies. Because these tools do shear with upward tension, gravel pack assemblies are normally set in compression to insure they do not shear when gravel packing pressures are applied. Figure 10-42 Shear-Out Safety Joint http://www.petrom.com 10-67 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL There are numerous types, combinations and systems of gravel pack completion equipment available to handle virtually any conceivable well conditions. Figure 10-43 shows typical gravel pack completions in cased and open hole using hydraulic type of GP packer type SC 1. The completions, as illustrated, make use of crossover type circulating gravel pack technology which is considered stateof-the-art in the industry today. The schematics shown in the next Figures (Figure 10-44, Figure 10-45 and Figure 10-46) have been selected to illustrate various best practices in oil and gas wells completed with various type of packers (Mechanical-PIROM MOCA H and HOVA C and Hydraulic type Baker) in OMV Petrom.. Figure 10-43 Typical Gravel Pack Completion Equipment in Cased and Open Holes 10-68 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Figure 10-44 Typical Gravel Pack Completion Equipment with PIROM MOCA H (operation and completion) http://www.petrom.com 10-69 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 10. SAND CONTROL Figure 10-45 Typical GP completion for oil/gas well with mechanical HOVA packer in oil/gas well 10-70 http://www.petrom.com 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Figure 10-46 Typical GP completion for oil/gas well with hydraulic packer in oil/gas well Based on the various cases of GP application in OMV PETROM, integrated workflow of low density GP best practice technology is shown in Figure 10-47 to Figure 10-51 and in Appendices 10-A, 10-B and 10-C. http://www.petrom.com 10-71 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 10. SAND CONTROL Figure 10-47 Integrated workflow of low density gravel pack technology applied in OMV PETROM 10-72 http://www.petrom.com 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Figure 10-48 Integrated workflow of low density gravel pack technology applied in OMV PETROM (continuation) http://www.petrom.com 10-73 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL Figure 10-49 Integrated workflow of low density gravel pack technology applied in OMV PETROM (continuation) 10-74 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Figure 10-50 Integrated workflow of low density gravel pack technology applied in OMV PETROM (continuation) http://www.petrom.com 10-75 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL Figure 10-51 Integrated workflow of low density gravel pack technology applied in OMV PETROM (continuation) 10-76 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL 10.5 Surface Equipment 10.5.1 Major Considerations in Equipment Preparation and job Planning Careful planning, well preparation, and completion execution are all required for completion success. The omission of any of these steps may account for a completion that falls short of its objectives since many of the completion operations are interdependent. To achieve the completion goals of sand control, productivity and longevity, attention must be given cleanliness, completion fluids, perforating, perforation cleaning, acidizing, gravel specifications, tool specifications and rig and service company personnel. The proper preparation of a well for sand control can be the key to a successful completion. Cleanliness may be one of the most important considerations when implementing a completion for gravel packing and Frac-Pack. Since a gravel pack represents the installation of a downhole filter, any action that promotes plugging the filter (i.e., the gravel pack sand) is detrimental to the success of the completion and well productivity. Many advances have been made in improving the cleanliness of gravel pack operations, particularly completion fluids (filtration). Also, the lack of cleanliness in the casing, work string, lines, pits and other equipment is a source of potential formation damage and lost productivity. Reverse circulation is the preferred method of circulation for cleaning the casing and the recommended annular velocity is 0.7 m/min (130 ft/min) for casing shoe deviations less than 60° and 90 m-min (300 ft/min) for deviations greater than 60°. Planning for a work string that will permit reverse circulation is required. Both mechanical, hydraulic and chemical cleaning agents should be employed to clean the casing. Mechanical agents are usually casing scrapers and most often hydraulic agents are push pills and filtered brine. It is recommended to run casing scrapers to the top of perforated interval/s. If new interval should be perforated the best practice is to run casing scraper to the bottom, or at least through the interval to be perforated. For open-hole completions, the scraper should be run within 30 m (100 ft) of the shoe or at least past the proposed packer seat. Work String The work string should be sized to permit reverse circulation and always be run in open ended to minimize back pressure on the formation. The work string will contain the same types of debris associated with the casing. However, unlike the casing, both the inner and outer surfaces must be clean because completion fluid will be circulated along both surfaces. Scraping the work string is usually not an option as with the casing, but visual inspections of the tubing before it is run into the well are encouraged to ensure that the tubing is in good mechanical condition and clean. As a minimum, a “rabbit” with a diameter equal to the drift diameter of the work string will help to loosen scale and other debris, as well as providing assurance of the internal diameter of the work string. Once the work string is clean every effort must be made to keep it clean. A common source of contamination of the gravel pack is thread dope lubricant. Recommendations are to use thread dope lubricant sparingly only on the pin ends during the completion phase, and to eliminate the use of thread dope completely on the final run in the hole just prior to gravel packing the well. Pickling the work string with a pipe dope solvent and 10% HCl before starting a gravel pack is a must. As with any http://www.petrom.com 10-77 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL solvent, there is a required contact time and wash rate to dissolve lubricant and carry material out the work string. The use of a dedicated clean work string strictly for gravel packing should be considered if a number of wells are to be completed. Surface Facilities Tanks and lines are sometimes ignored but are a common cause of damaging materials, particularly when the rig that drilled the well is used for completing the well. Tanks must be thoroughly scraped and jetted to ensure any residual solids are removed. Tank must be properly cleaned and conditioned. Two cases (bad and good) are shown in Figure 10-52. Figure 10-52 GP fluid tanks with prepared carrier fluid 10.5.2 Pumping Equipment and Filtering System Gravel-pack completion fluids must be sufficiently clean in order that suspended particles do not plug or reduce the permeability of the formation, perforations or gravel-pack sand. In order to achieve a clean fluid a filtration is required. Completion fluids are typically filtered in the range of 2 to 10 microns, but in It is preferable to filter brine with 2 micron and this depend of reservoir properties. The fluid can be filtered by either a diatomaceous earth (DE) filter upstream in combination with a cartridge filter unit downstream, or with a cartridge filter unit alone (see WO BP Well Control, Section 4.8) Since diatomaceous earth is less expensive than cartridges, the use of a DE filter with a cartridge filter downstream will be more economical than a cartridge filter unit alone. This is especially true if the workover fluid is very dirty, or if large volumes of fluid are required, as in the case of gravel and frac packing . Pumping equipment with filters is shown in Figure 10-53. If a gravel pack is to be done and contaminated fluid is used as carrying fluid, the small particles of solids mixing with the sand will take up the pore space between the sand grains reducing permeability. The key question is how clean does the fluid need to be and what size particle should be removed. The answer on this question is related to how accurately the pore space can be characterized (permeability, porosity, pore throat size and distribution etc.). Very often data concerning pore 10-78 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 10. SAND CONTROL space characterization are not available or, if they exist, they have been taken in early stage of field development and do not represent the current situation. The models used capillary pressure measurement can be used to estimate two main petrophysical parameters (permeability-K and porosity- φ) to calculate average pore throat size and based on that to define the minimum size of the filter used for filtering brine used as carrier fluid in GP or Frac-Pack operations. The following table (Table 10-20) can be used as guidance for determination of the pore throat size, and consequently for selection type of filter and size. Table 10-20 Summary of particle size affects Particle Size < 1/3 pore throat diameter 1/3 to 1/7 pore throat diameter < 1/7 pore throat diameter < 2 micron Affect Bridge instantly on the throat and do not penetrate the information. Solution: Filter fluids to remove particle + >1/3 the pore diameter. Remove particle from the perforated tunnels by applying a perforation wash tool. Invade the formation and bridge on the pore throat in the formation. Solution: Filter fluids to remove particle less than 14% of the pore diameter Normally, these particles are considered as non-damaging to the formation. Considered as non-damaging Relations Coberly: d= D50/6.5 Kozeny model: 𝑑 = 0.128� Blick-Civan 𝑑=� 𝐾 ∅ 32𝐾 ∅ OMV Petrom 𝑑 = √𝐾 Rules: If Dp > d/2 then bridging occurs If d/7 < Dp<d/3 then shallow invasion occurs (worst case) If Dp < d/7 then deep invasion occurs (no problem) Where: d – average diameter of pore throat(micron) Dp- particle diameter (micron) , K – permeability (mD) φ- porosity (%) Figure 10-53 Pumping unit with filters http://www.petrom.com 10-79 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL 10.5.3 Treatment Monitoring System During packing operations the recommended practice is to record the following data (sample frequency should at least each 5 second) as shown in Figure 10-54 • • • • • • • • Treating Pressure Annulus Pressure Slurry Rate Return Rate Proppant Concentration Washpipe Pressure \ Temperature Bottom Hole Drillpipe and Annulus Pressure \ Temperature (Bundle Carrier) Accurate amount of proppant reversed out following gravel pack Figure 10-54 Recorded operation parameters during GP installation Pressure and time recorder (Figure 10-55) should be used and installed during operation Figure 10-55 Pressure and time recorder 10-80 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Workover Best Practices 10. SAND CONTROL 10.6 Materials for Sand Control 10.6.1 Carrying Fluid Comparison between HEC slurry pack and brine water pack carrier fluid is shown in Table 10-21 below. Table 10-21 Comparison HEC slurry pack and Brine water Fluid Viscosity (mPas) Typical gravel concentration (kg/lit, lbm/gal) Typical pump rate (lit/min, bbl/min) HEC Gel 300-750 1.2-1.8, 10-15 160 -640, 1-4 Brine-KCL 1-2 0.12-0.36, 1-3 640-800, 4-5 10.6.2 Gravel Pack Gravel pack well productivity is sensitive to the permeability of the gravel pack sand. To ensure maximum well productivity only high quality gravel pack sand should be used. The API RP58 establishes rigid specifications for acceptable properties of sands used for gravel packing. These specifications focus on ensuring the maximum permeability and longevity of the sand under typical well production and treatment conditions. The specifications define minimum acceptable standards for the size and shape of the grains, the amount of fines and impurities, acid solubility, and crush resistance. A summary of the API gravel test procedures and specifications are given in Appendix 1010F. Only a few naturally occurring sands are capable of meeting the API specifications without excessive processing. These sands are characterized by their high quartz content and consistency in grain size. A majority of the gravel pack sand used in the world is mined from the Ottawa formation in the Northern United States. Table 10-22 gives the permeability of common gravel pack sand sizes conforming to the API RP58 specifications. Table 10-22 Permeability of Gravel Pack Sands U.S. Mesh Range 6/10 8/12 10/20 12/20 16/30 20/40 40/60 50/70 Permeability of Gravel Pack Sands Permeability (Darcy’s) 2703 1969 652 171 69 - 500 250 119 40 - 668 415 225 69 45 10.6.3 Coated Gravel Pack Used primarily in prepacked screens. Also used in thermal wells where the resin is thought to protect the sand grains from dissolution by high pH steam. High temperature required to cure resin. Strength of consolidated pack is dependent on curing temperature and time. Consolidated pack will lose compressive strength when exposed to HCl-HF mud acid. http://www.petrom.com 10-81 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL 10.6.4 Other Chemicals Polymers are used to viscosify brines in order to enhance transport characteristics. Before each job the proposed polymer and brine combination should be carefully analyzed for compatibility with the formation and reservoir fluids. Chemical nature of some chemicals frequently used for sand control is shown in Table 10-23 below. Table 10-23 Other chemicals specifications Gelling Agent HEC SGC Xanthan Surfactant Gel Chemical Category Hydroxyethyl cellulose Succinoglycan, biopolymer Clarified biopolymer Ammonium quat Trade Name HEC-10, Hydropac, Aquapac Shellflo-S, Flopac Xanvis, Biopac Permpac 10.7 Quality Assurance and Safety Requirements The standards of service quality for sand control operations of OMV Petrom is primarily focused on defining the minimum requirements to assure safe and reliable operations , before, during and after job execution. 10.7.1 Service Before commencing the job, all job procedures, defined by detailed technical program and design, should be agreed by all parties and included in the job execution. All perforations must be cleaned prior to gravel packing. Washing perforation and cleaning by using a flapper milling tool are methods that are commonly used in OMV Petrom SA. As the surging of perforation with a downhole atmospheric chamber is the most effective technique to clean perforation, this method should be considered as a viable option for cleaning perforation before installing GP or Frac-Pack. When surging on a separate trip following perforating, perforate the well with a moderate 7 to 20 bar (100-300 psi) under balance so to minimize risk of gun sticking. If the well is not surging, use an industry correlation to determine minimum and maximum underbalance values for perforating operations (See Chapter 6 - Perforation BP). Use low debris, big hole gravel pack charges with a high shot density in a spiral pattern (60o phasing). Recommended practice to achieve planned volume is to surge 50 lit/m (4 gallons/feet) of perforations to ensure clean up of perforation tunnels. The surge workstring should be placed above the top of perforation equivalent to 1.5 times the planned surge volume. Use an electronic optical scanner over the full length of the screen to determine slot dimensions. It is required that 97.5% of all observations must fall within +- 1.5 gauge (0.0015 inch/38 microns). Ensure adequate strength of screen, screen jacket, base pipe, welding and blank pipe for running and gravel pack conditions. To assure the screen in not resting on the bottom, a centralizer should be used. Before the job begins, perform QA/QC checks of the proppant, viscosifier, cross-linker, breakers, and mix water to be used for the Frac-Pack treatment. 10-82 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL As the cleanliness is the most critical for assuring planned well productivity it is required to avoid using of any doping of the workstring pipes after pickling or while running GP assembly. Any excess of dope from all connections must be wiped. It strongly recommended avoiding pump perforating debris being left into the well or letting it flow back into perforations via fluid loss. The gravel pack screen should not be run in particle-laden fluid, unless the fluid in the well (brine or mud) has been tested against a screen 2 gauge (0.002 inch, 0.051 mm) sizes below minimum design screen gauge to ensure that fluid will pass through. A high-pressure manifold should be connected to the surface equipment to allow fluids to be pumped in any combination of paths by opening and closing the appropriate valves. Full-opening valves should be mounted in any line through which high flow rates will be pumped. The full-opening valves impose minimum restriction to fluid flow. A densometer should be used to measure proppant concentration in both the injection and return lines It is not recommended to use two separate pressure lines from the pump trucks to the well for tubing and casing, as shown in Figure 10-56, but it is recommended to use a manifold with the high pressure lines. Potential tubing contraction should be calculated during the job. Tubing-string movement should be estimated and precautions should be taken to prevent such movement. Downhole tools (packer, blank pipe, crossover toll etc,) used for Frac-Pack operations must withstand high pressures during a job which is often higher than during a conventional fracture stimulation. When screenout occurs, differential pressure will be high and GP packer should be able to withstand this high differential pressure. Also, blank pipe used as part of downhole equipment should be able to withstand screenout pressures. If the predicted/estimated screenout pressure is higher than hydraulic packer ball shear out pressure then work string and surface line should be tested with pressure over 20% of the maximum treated pressure. Figure 10-56 Connection of surface lines http://www.petrom.com 10-83 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL If properly filtered brine is used, the hole should displaced as recommended and surface facilities should cleaned. This process allows us to obtain brine returns less than 20 Nephelometric Turbidity Units (NTU). Again, this is only possible if all of the steps are followed and there are no "short cuts". In order to avoid premature failure of downhole equipment it is not allowed to use mixed material (standard steel and for example Inox, as can be seen in Figure 10-57. In such cases copper couplings between standard steel and INOX steel should be used to prevent the corrosion problems. Figure 10-57 Using mixed materials for various component of downhole equipment 10.8 Safety Requirements OMV Petrom SA safety standards and documents should be provided on site and all personnel must be introduced with officially internal standards concerning to sand control methods. The purpose of these standards is: • to prevent personal injury • to prevent loss of equipment 10.8.1 General Safety Considerations To ensure that rig personnel and 3rd party (external service companies) personnel are aware that each person on the job understands their responsibility. Prejob safety briefing is mandatory. The job supervisor will discuss responsibilities, personnel stations and when each person should perform their assigned task. The job supervisor has to discuss the following topics during the prejob safety briefing: • Job procedures • Pressure limitations • Escape routes and emergency equipment locations • Only assigned personnel in the area • Emergency response plan • Hand signals and radio communications. The job is performed according to procedure and design. If at any time during job execution a problem occurs, execution should be halted until the job supervisor, together with all parties, decide on the required action. If the job execution cannot be halted when the problem occurs, execution will continue until the first opportunity to stop comes. 10-84 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Required Communications Operational two-way radios and hand signal should be available during job execution. If during job execution a leak occurs in treating line, the following procedure is to be followed: • • • • • • • • • Notify the job supervisor. If possible displace the fluid in the line with a nonhazardous material. Close the wellhead valve. Bleed pressure off of the high-pressure line. Repair the leak. Pressure test the line and then bleed off. Apply pressure to the line equal to the anticipated treating pipe pressure. Open the wellhead valve. Resume the job execution. All personal should strictly follow the procedure for safe equipment backloading. Prior equipment backloading job/Well site supervisor should meet with crane operator and give him equipment weights and information about hazardous material. Also, the responsible personnel on site should check and ensure before backloading equipment that: • All oil drip pans are clean and empty. • Drip pan plugs are in place. • Slings are inspected for damage and correct attachment. • Blenders are empty of fluid. • All suction manifolds are capped. • Drains are open. • All acid tank lids are secured. • Plugs are sealed on marine portable tanks. • The correct paperwork is sent with the equipment. The supervisor will organize postjob meeting on order to analyze and discuss job execution Discussion includes the following: • Was the equipment rigged-up in accordance with location safety standards? • Was the job executed per design? • Was the client satisfied with performance? • Incidents (what happen, who was involved, where there any injuries, were hazards recognized prior to the job, were hazards mentioned in the prejob briefing, what actions were taken on location, what steps will be taken to prevent future occurrences). All treating equipment has to be inspected and maintained in accordance with technique directives and standard equipment maintenance program defined by OMV Petrom. Equipment which is returned from a job must be thoroughly inspected and pressure tested (where applicable) in accordance with the standard equipment maintenance program. The Equipment Supervisor must insure that each piece of equipment is inspected using designated procedures. All hand tools must be inspected prior to use. http://www.petrom.com 10-85 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL Regardless of materials or service, as a minimum, the standard safety equipment (hard hat, uniform, boots, safety glasses and gloves) is worn by all personnel. Any additional safety equipment required for particularly hazardous fluids or operations must be used. 10.8.2 Personnel Requirements Only personnel trained will be allowed to operate and execute the job. The company should prepare the list of specific training that personnel must complete in order to participate to the sand control operations. Prior to assigning an equipment maintenance task to a technician, the equipment supervisor must determine that the technician has been trained and certified to perform the task and that all personal safety equipment is used. All personnel not essential to pumping operations should stay of the injection and return lines on the rig floor during pumping. 10-86 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Appendix 10 - A Baker Sand Control Packer Specifications and Setting Procedure Packer setting and sealing In order to set to and to seal the Baker hydraulic packer, the following operations will be taken: • the BOP will be closed; • the circulation way through crossover and work string will be washed by reverse circulation: - fluid type: operating fluid; - volume: 1.5 x work string volume; - rate: max 250 l/min. Note: The return fluid will be sent to the operating fluid tank. • • • • • • • • • • • the work string return will be closed; the connection between the direct injection line and the quick operated valve will be unscrewed; the quick operated valve is closed; the packer setting ball is placed inside of the quick operated valve; direct injection line is remade; the casing sleeve valve is closed; the surface lines are tested at: - 350 bar for direct injection; - 100 bar for return circulation; the setting ball will be dropped through the work string by opening the quick operated valve and wait for it to land on the seat (waiting time: 5 min for every 300 m of work string); the BOP will be opened and the slips will be removed; 2 - 2,5 t will be set on packer and the BOP will be closed; The procedure used to set and seal the packer will be carried out; Note: 1. The minimum pressure necessary to set and seal the packer in a proper way is 218 bar; 2. If the pins from the seat are sheared before the above pressure is reached, the secondary ball will be dropped and the pressure will be increased again in the work string at the minimum value necessary for setting; 3. While the setting procedure has started, the weight indicator shows an increase in load, the work string will be lowered slowly so that the hook load will remain the same. • The procedure for testing the setting and the sealing will be made. http://www.petrom.com 10-87 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL Testing the circulation through the hydraulic assembly Baker type Testing the circulation lines through the hydraulic assembly type Baker will be done by the following steps: • BOP - “open” • The work string will be released from the hydraulic packer and then lifted to verify the success of release operation. The injection line will then be connected . • BOP – “closed” • Check reverse out position; • The reverse for the work string will be closed; • The annulus reverse – “open”; • Establish circulation through crossover port by shearing the pins of ball seat 295 bar. Note: 1) If the secondary ball was used to set packer, the circulation ports through crossover tool are opened; 2) To pool the secondary ball out of hole, the next following steps are required: - Close BOP; - Work string set in slips; - Unscrew quick operated valve; - The fluid is reverse circulated untill secondary ball reaches the surface; - Add the quick operated valve at top of work string; - Direct injection line is reestablished and slips are removed. • The operating equipment will be moved in upper circulation position needed for production sand screen packing; • Circulation test is run for production sand screen packing and the working pressure is recorded: - fluid type: operating fluid; - volume: approx. 1000 l; - injection rate: approximately 500-600 l/min; • Reset the work string in squeeze position (max. load on packer: 5-6 t); • Injectivity test: - fluid type: operating fluid: - volume: approx. 1000 l; - injection rate: approx. 450 l/min; 10-88 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Table 10-24 Use range- Baker packers http://www.petrom.com 10-89 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL Appendix 10 - B GP Completion Procedure with Mechanical Packer Type PIROM MOCA-H SAND CONTROL COMPLETION SYSTEM This type of completion enables the well to be produced with a fixed pump run inside the production screens or below the perforated interval. This process takes place in two stages: Stage I a) RIH and positioning of the downhole equipment to the established depth. Configuration of the BHA is: • Production screens plug. • STIMPEX stainless steel wire wrapped type production screens; • TBG lower blank pipe; • STIMPEX stainless steel wire wrapped type control screen; • TBG upper blank pipe; - Safety joint (PF); - PIROM crossover tool (MF); - PIROM retrievable sand control packer tool (PK). - PIROM service tool (DOC). b) PK setting and PK sealing; c) Sand squeezing in to formation and screen out; d) POOH DOC + PK + MF to surface. Stage II a) RIH MOCA 142-157 production packer (PP) and set in PF Note: To be able to set PP, a hydraulic setting tool MOCA-H 142-157 ( CL )has to be used . b) PP casing sealing; c) POOH CL to surface. COMPLETION PROGRAM DOWNHOLE EQUIPMENT PREPARATION PK Equipment PK equipment comes in two subassemblies and it is prepared to be launched in the well according to Chapter 5 of the 888-00 N.T. Technical Note (preparation will be performed at the equipment’s manufacturer BAT Târgovişte). PP production packer The PP production packer is delivered and prepared to be launched in the well according to Chapter 5 of the 915-00 N.T. Technical Note (training will be performed at BAT Târgovişte equipment manufacturer). 10-90 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 10. SAND CONTROL WELL COMPLETION Stage I Downhole equipment (PK) running, setting and sealing procedure After warehouse preparation the following steps will be undertaken: • Wireline gauge run for TD check • M/U downhole BHA in the following order: • Production screens plug; • STIMPEX type stainless steel wire wrapped production screen; • TBG 4 API 5 CT lower blank pipe; • STIMPEX type stainless steel wire wrapped control screen; • TBG 4 API 5 C upper blank pipe; • Wash pipes (WP); • DOC + PK + MF + PF retrievable equipment; Note: DOC+PK+MF+PF retrievable equipment will be prepared in the workshop and will be brought to the well site. Start RIH BHA. Note: 1) The combined working string will be fully tested in the well at 250 bars; The work string will be tested to Pmaxtest = 20% above Preftest. (Best practice in OMV PETROM is 250 bar). 2) While M/U the BHA drift screens and WP. 3) While RIH with the tubing, test each joint with appropriate drift. 4) Space out work string in order to have 0.5 - 1 m stick out above rotary table approx.. Note: If the packer cannot set or if the check of the packing elements integrity is negative the packer will be replaced. • Start RIH the BHA with the working string to TD. Tag TD and slack 0.5t, then PU 0.5m. • • • • • • Set working string in the spider; Install Gray safety valve on top of working string; R/U surface equipment. Line up surface lines for: Direct circulation - tacking returns on surface. Reverse circulation - taking returns on surface. Pressure test lines as follows: • Direct pumping lines to Pmaxtest = 20% above Preftest. (Best practice in OMV PETROM is 250 bar). • Return lines to 150 bar. http://www.petrom.com 10-91 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL Note: 1) The returns will be recovered during direct pumping and as well as during reversing out to surface in the tank used for storing the dirty fluids. 2) Surface lines will be rig- up in order to be able to move the work string up at least 4m. • Fill up annular space. Note: 1) The well will be filled up with working fluid. 2) If the well cannot be filled up (formation has significant losses) the operation will be performed after setting the packer. • Close BOP. • Circulate in reverse the work string taking returns on surface. - fluid type: working fluid; - volume: approx. 1,5 working string Volumes; - circulation flow rate : approx. 300 l / min; • Open casing in order to be able to take returns; • Close the returns on the pumping line • Pump in direct and take returns on surface - fluid type: working fluid; - volume : approx. 1000 l; - circulation flow rate : approx. 500 l / min; Note: The returns from direct or reverse circulation will be received in the tanks used for storing working fluid. • Open BOP; • Disconnect the pumping line to the work string; • Remove the spider; • Set the packer Note: The slack on the packer has to be from 6 to 0 t. • • • • • • • • • Close BOP; Connect the pumping line to the work string; Pressure test from back side the packer sealing at 50-60 bar. Close the work string returns. Open the casing. Pump directly and check if the downhole tools are working properly. fluid type: working fluid; volume : 1000 l; circulation flow rate : approx. 500 l/min; Note: The surface returns will be taken in the working fluid storage tank. • • 10-92 Release the DOC from the PK as follows: Drop from the surface a Φ = 28, 575 mm ball; http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL • • Take 15 minutes break to let the ball to reach the ball sit; Pump in direct in order to increase the working string pressure up to (100 bars) to shear the ball sit shear pins. Note: the release of the DOC from the PK will be noticed by drop of pressure to 0 bar • • • • • • • • • • • • • • • Close BOP; Open casing return valve; Perform the direct circulation test; Fluid type: working fluid; Volume to be pumped: approx. 1000 l;; Circulation flow rate: approx. 500 l / min; Close casing return; Keep weight on packer at 6…10 t; Perform the injectivity test as follows: Bring the casing pressure to approx. 70 bars and maintain it during the test: Fluid used: working fluid; Squeeze fluid information through the working string: Fluid used: working fluid; Circulation flow rate : 500…600 l/min Testing time: approx. 1…2 minutes. Sand injection into formation Increase pressure in casing up to approximately. 20 bars above the pressure recorded during the injectivity test. Do not exceed 100 bar. Pump in a slurry of working fluid and sand through the working string. • injection flow rate : 500…600 l/min • pumping ratio : approx. 5…6 m³ fluid / 1 t sand • injected sand quantity: approx. 4,8 t (rated value); • maximum injection pressure rate : 80…90 bars. Note: 1) The injection flow rate / sand quantity to be injected can be changed due to flow rate /pressure recorded during the injectivity test. 2) If the injectivity pressure is equal or higher than 90 bars the gravel pack operation will be started. GP Production screen If the screen gravel packing is not completed during the first sand injection, repacking will be carried out as follows: • Ensure the returns are received on surface: • Stop pumping in annulus; • Open slowly casing return line; • Continue pumping in direct the mixture of working fluid with sand: • Injection flow: 300 - 500 l / min; • Pumping ratio: 5-6 m3 fluid / 1 t sand; • Pump in well the total required sand mass; http://www.petrom.com 10-93 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL • Maximum circulating pressure: 100-120 bar. Removal of sand excess from work string and POOH of DOC+PK+MF The operations sequences are: • - place DOC in reverse circulation position by lifting the working string 1,65 – 2,15 (1,9 m recommended) from the PK setting position; • - circulate in reverse using working fluid until clean returns; • - POOH DOC + PK + MF and wash pipes. Note: 1) After pulling out the service tool (DOC + PK + MF + wash pipes) the PF and the gravel pack production screens will remain in the well bore. 2) The necessary force to pull out the downhole equipment is 1.5 - 5 t. Stage II RIH PP and PF setting PP installation and its setting in PF will be executed as follows: • Perform gauge run using wire line in order to check the PF position; • RIH the CL + PP assembly (use the same working string that was used to run the PIROM equipment); • Set by slack off PP in PF (recommended setting weight is 2-4 t); • Perform pull test 2-3 t. Release PP sealing and POOH CL In order to seal the PP it is necessary to release CL from PP as follows: • Remove the spider and set the work string in neutral. • Drop the Φ = 34.93 mm ball from the surface; • Take a 15 minutes break to let the ball to rich the ball seat; • Increase the pressure in the working string to shear the four pins of the setting piston. Note: 1) The release pressure of CL from PP will be of about 70 ± 30 bar; 2) The CL release from PP will be seen by the sudden pressure drop to zero and usually getting surface returns through the annular area. PP sealing procedure: • - Slack the work string and share the setting share pins • - Continue slacking the work string till the sealing element starts to inflate and seal. (recommended slack off force 7-8 t) • - Perform back side pressure test at 50-60 bar. • - Release CL from PP by strait pool of work string (max pooling weight 12 t • -POOH CL. 10-94 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Table 10-25 Use range-Pirom packers http://www.petrom.com 10-95 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Table 10-26 Use range – Moca packers 10-96 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Appendix 10 - C GP Completion Procedure with Mechanical Packer Type HOVA-C SAND CONTROL COMPLETION SYSTEM For an effective operation of the sand control it is necessary that well is completed with gravel packing mechanical system by using a HOVA type mechanical equipment including the following components: • Production screens plug, • STIMPEX stainless steel wire wrapped type production screens, • Lower blank pipe, • STIMPEX stainless steel wire wrapped type control screen, • Upper blank pipe, • Safety joint, • Crossover tool, • HOVA – C mechanical packer, COMPLETION PROGRAM DOWNHOLE EQUIPMENT PREPARATION The HOVA equipment for gravel packing operations is delivered as follows: • Mechanical packer, • Circulations crossover tool, • Safety joint, The HOVA mechanical packer, the crossover tool and the safety joint are delivered by the equipment manufacturer as whole unit The service tool comes in two subassemblies: Upper subassembly: • Running sub, • Adjustable bushing, • Threaded blocking pin, • Washing pipe, • Pocket guide, Lower subassembly: • Sealing extension • Ball • Seat nipple. Preparing the downhole assembly for RIH will take place in the warehouse according to the “HOVA – C downhole equipment preparation procedure for RIH”. PACKER RUNNING, SETING AND SEALING After warehose preparation of the HOVA packer running, setting and sealing, the following steps will be done for: Check total depth (TD) with wireline http://www.petrom.com 10-97 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL Downhole BHA in the following order: • Production screens plug, • Production screens, • Lower blind pipe, • Control screen, • Upper blind pipe, • Wash pipes, Subassembly includes: • Safety joint; • Lower extension; • Crossover tool; • Mechanical packer; • Service tool. The subassembly: service tool – mechanical packer – crossover tool – lower extension – safety joint should be delivered to the well as one peace. Start RIH BHA Note: • • • • • The work string (API 5 CT 2 7 / 8 in - C75 or N 80 tubing) should be tested to 250 bar. While M/U the BHA drift screens and wash pipe.. While RIH tubing, drift each joint with appropriate drift. When making up the working string use dope on each connection and torque the threads at recommended value. Space work string in to have above rotary table approx. 1.0 m stick out. Test packer set as follows: • RIH the downhole assembly with a piece of the working string; • Lift the working string about 80 cm, • Turn the working string 2-3 turns to the left, • Lower the working string until the packer sets in the casing, and the working string remains suspended. Unset the packer and POOH by performing the following operations: • Lift the working string minimum 1 m, • Turn the working string 2-3 turns to the right. • Lift the working string until the HOVA sticks out, • Check the strings condition and the packer’s setting system then restart the downhole equipment RIH with the working string until it reaches the established depth. If the packer is not set or if the check of the packing elements integrity is negative the packer will be replaced. • Set working string in the spider, • Install Gray safety valve top of working string 10-98 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Line up surface lines for: • Direct circulation tacking returns on surface. • Reverse circulation tacking returns on surface. Pressure test lines as follow: • Direct pumping lines to 250 bar. • Return/Reverse lines to 150 bar. Note: The returns will be recovered during direct pumping and as well during reversing out to surface in the tank used for storing the working fluid. Surface lines will be rigid up in order to able to move the work string up at least 4m. Ensure an open position for: • BOP, • Return and Gray valve of the working string, • Casing valve, • Close the casing return and fill in the annular space with working fluid. If the well can not be filled up ( there are high losses into formation ) the operation will be performed after setting the packer. • Shut off BOP, wash out the working string by reverse circulation with approximately 300 l/ min taking returns on surface. Circulation volume should be approximately equal to 1.5 working string volume. Note: Taking returns on surface for both direct and reverse injection will take place in the tank for working fluid storing. • Open the BOP; • Close the return on the working pipe; • Check direct circulation taking return on surface: • Fluid type: working fluid; • Quantity: approx. 1000 l; • Circulation flow: approx. 500 l / min; • Open BOP; • Free the line from the Gray valve; • Remove the spider; • Set and seal the packer in the casing as it follows: • Check the bottom hole (maximum load on bottom hole about 1 tf); • Lift the operating string from 50 to 70 cm above the bottom hole; • Turn the operating string 2 - 3 turns to the left; • Lower the working string until the packer is set in the casing; • Continue lowering the working string until the necessary weight is achieved in order to assure the sealing of the packer. Note: In order to perform the sealing the load on the packer has to be of minimum 6 tf. • Close BOP and casing return; • Remake the line up to the Gray valve; • Perform the packer’s sealing test at a 50…60 bars; • Turn off the working string return; • Close the casing string return; • Open casing return; • Check the circulation lines through the direct circulation downhole assembly: http://www.petrom.com 10-99 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL • • • • • • • • • • • • Fluid type: working fluid; Quantity: 1000 l; Circulation flow: approx. 500 l/min; Hang the working string in the spider; Close the casing return and valve; Close the working string Gray valve; Uninstall the line up of the working string above the valve; Place the setting ball above the previous shut valve; Remake the line up to the Gray valve; Pressure test line; Pressure in casing/return line: 150 bar; Pressure in the working string: Direct pumping lines to Pmaxtest=20% above Preftest ( Best practice in OMV Petrom is 250 bar); • Open the BOP; • Remove the spider and assure the minimum 6 tf; • Release the service tool from the packer: • Set the ball by opening the valve on the working string and wait until it drops (without gravitation) on the ball seat (waiting time approx. 1 min. / 160 m of working string); • Release the running sub from the packer by shearing the ball pins: • Pins shearing pressure: 150 – 200 bar; • Increase pressure at each step by 50 bar with 1 minute break. Note: After shearing the pins, the seat and the ball will lower in the pocket guide’s ports clearing the line ups. • Close BOP; • Open casing return and valve; • Perform direct circulation test: • Fluid type: working fluid; • Qquantity: 1000 l; • Circulation flow: 500 l / min; • Close the casing return; • Perform injectivity test as follows: • Bring the casing pressure to approx. 70 bars and maintain it during the test: • Fluid used: working fluid; • Squeeze fluid in formation through the working string; • Fluid used: working fluid; • Circulation flow: 500…600 l / min; • Testing time: approximately 1…2 minute. Note: If the injectivity pressure is equal or more than 90 bar pass directly to the gravel packing. SAND INJECTION IN FORMATION Inject sand in formation should be performed following the procedure: • Maintain the circulation lines made for the receptivity test; • Maintain the minimum load on the packer at 6 tf; • Maintain a casing back pressure higher than the receptivity pressure registered on the working string, but no higher than 100 bar; 10-100 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL • Initiate and continue working fluid injection with sand in suspension until the maximum admitted pressure is reached. The technological parameters for sand injection are: • Fluid used: working fluid; • Injection sand quantity: approx. 2,4 ; • Circulation ratio: 5…6 m³fluid / sand t; • Injection flow: 500…600 l / min; • Maximum injection pressure rate: 80-90 bar. Note: • • • • The volume/mass of the sand needed is estimated as part of detailed design program. The pressure in the casing should to be approx. 20 bars above the pressure registered in the injectivity test, without exceeding 100 bars value. The maximum pressure value may be modified depending on the pressure values recorded during injectivity test. If the casing back pressure recorded during the injectivity test is equal to the maximum pressure this step should be skipped and start directly with the production screens gravel packing operation. GP Production screen • • • • • • • • • If the maximum sand injection pressure is reached, the production screens gravel packing will be made as follows: Stop sand metering; Assure returns are taken on surface through: Stop casing pump; Slowly open casing return; Continue pumping working fluid without sand in suspension, taking return on surface: Circulation flow: 300…500 l / min; Necessary sand (in theory): approx. 380 kg; Circulation maximum pressure: 120 bar. Note: The mass of sand in suspension in the working string at the moment when the maximum injection pressure is reached and its measured mass in the working fluid when the injection is stopped should be sufficient to complete cover GP screens. THE REMOVAL OF THE SAND EXCESS IN THE WORKING STRING In order to eliminate the sand excess in the working string the following operating sequences should be performed: • Open casing return line; • Close casing return; • Increase the casing pressure to an approximatelly 60 bar; • Place the working tool in the reverse circulation position, by lifting 2.5 m the working string; • Circulate in reverse until clean fluid return; • POOH the running sub and the washing pipes. http://www.petrom.com 10-101 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Table 10-27 Use range – Hova packers 10-102 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 10. SAND CONTROL Appendix 10 - D Schlumberger Sand Control Packer Specifications Table 10-28 Use range-Schlumberger packers http://www.petrom.com 10-103 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 10. SAND CONTROL Appendix 10 - E Weatherford Sand Control Packer Specifications Table 10-29 Use range-Weatherford packers 10-104 http://www.petrom.com 2012 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 10. SAND CONTROL Appendix 10 - F Standards Table 10-30 API Specification for Gravel-Pack Sand API Specifications for Gravel-Pack Sand Sieve Analysis A minimum of 96% by weight of the tested sand sample should pass the designated course sieve and be retained on the designated fine sieve (with the designated course and fine sieves defined for specific size gravels in the RP58). Not over 0.1% of the total tested sample should be retained by the most course designated sieve and not over 2% of the total tested sample pass through the most finely designated sieve. No more than 1.9% of the total by weight should be retained by the second sieve screen (100% - 0.1% - 2% - 1.9% = 96%). Gravel pack sand should have an average sphericity of 0.6 or greater and an average roundness of 0.6 or greater as determined by visual analysis using the chart developed by Krumbein and Sloss (API RP60, From Stratigraphy and Sedimentation, Krumbein and Sloss). Sphericity and Roundness Acid Solubility Silt and Clay Content Crush Resistance A 5 gram sand sample is added to 100 ml of 12%-3% HCl-HF acid and allowed to sit for one hour at 72°F to allow dissolution of contaminates (carbonates, feldspars, iron oxides, clays, silica fines etc.). The sand is then removed and dried. The before and after weights are compared to determine acid solubility. The acid soluble material in gravel pack sand should not exceed 1.0% by weight. A 20 ml sample of dry sand is mixed with 100 ml of demineralized water and allowed to sit for 30 minutes. The sample is then shaken vigorously for 30 seconds and allowed to sit for 5 minutes. A 25 ml sample of the water-silt suspension is removed and the turbidity is measured. The resulting turbidity of tested gravel pack sand should be 250 NTU's or less. A sand sample is sieved to remove all fines and weighed. The sample is then exposed to 2,000 psi confining stress for two minutes. The sample is resieved to determine the weight of fines generated. Gravel pack sand subjected to this test should not produce more than 2% by weight fines. For large sand sizes, 12/20 U.S. Mesh and 8/12 U.S. Mesh, the amount of fines produced should not exceed 4% and 8% respectively. http://www.petrom.com 10-105 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 10. SAND CONTROL List of Figures Figure 10-1 Sand Control Process Managing, Figure 10-2 Critical drawdown and sanding potential, Figure 10-3 Gravel Pack Life Time in OMV Petrom, Figure 10-4 Internal Gravel Pack System Boundary Figure 10-5 Internal Gravel Pack System Functional Block Diagram Figure 10-6 GP completions analysis in OMV Petrom (from 2009 to 2011) Figure 10-7 GP completions and failures for Assets Figure 10-8 GP completion run life analysis Figure 10-9 Schematic of Gravel Pack technology, Figure 10-10 Non-plugged gravel pack, Figure 10-11 Partially Invaded Gravel Pack, Figure 10-12 Non-Uniform Sand: Sieve Analysis vs. Laser Scattering, Figure 10-13 Particle Size Distribution, Figure 10-14 Particle size distribution for different locations, Figure 10-15 General workflow for selecting sand control mechanical system, Figure 10-16 Standalone Screens Selection, Figure 10-17 GP selection workflow-GP vs. Frac pack, Figure 10-18 GP selection workflow for open hole wells (GP vs. SAS), Figure 10-19 GP selection workflow for cased hole wells, Figure 10-20 Results of Saucier’s Gravel Size Experiments, Figure 10-21 Optimization of Gravel Pack Sand, Figure 10-22 Uniform (A) and Non-uniform (B) sand, Figure 10-23 Gravel Pack Design Workflow in Petrom OMV, Figure 10-24 Inside casing GP solution, Figure 10-25 Volume of the gravel per length of perforated interval, Figure 10-26 Gravel settled volume (SI and API), Figure 10-27 Recommended Workflow for GP Design Using High Density-High Concentration, 10-106 http://www.petrom.com 2012 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 10. SAND CONTROL Figure 10-28 Quality of Annular pack using brine and slurry pack, Figure 10-29 Frac Pac without/with Screen, Figure 10-30 Tip Screen Out (TSO) Fracturing Process, Figure 10-31 Frac pack geometry and production behavior, Figure 10-32 Frac-Pack design and execution workflow, Figure 10-33 Frac-Pack design and execution workflow (Continuation), Figure 10-34 Frac-Pack design and execution workflow (Continuation), Figure 10-35 Frac-Pack design and execution workflow (Continuation), Figure 10-36 Frac-Pack design and execution workflow (Continuation), Figure 10-37 Hydraulic Setting Tool, Figure 10-38 Gravel Pack Crossover Tool, Figure 10-39 Gravel Pack Crossover Tool Positions, Figure 10-40 Hydraulic Retrievable Gravel Pack Packer Model “SC-1”, Figure 10-41 Gravel Pack Extensions, Figure 10-42 Shear-Out Safety Joint, Figure 10-43 Typical Gravel Pack Completion Equipment in Cased and Open Holes, Figure 10-44 Typical Gravel Pack Completion Equipment with PIROM MOCA H (operation and completion), Figure 10-45 Typical GP completion for oil/gas well with mechanical HOVA packer in oil/gas well, Figure 10-46 Typical GP completion for oil/gas well with hydraulic packer in oil/gas well, Figure 10-47 Integrated workflow of low density gravel pack technology applied in OMV PETROM, Figure 10-48 Integrated workflow of low density gravel pack technology applied in OMV PETROM (continuation), Figure 10-49 Integrated workflow of low density gravel pack technology applied in OMV PETROM (continuation), Figure 10-50 Integrated workflow of low density gravel pack technology applied in OMV PETROM (continuation) Figure 10-51 Integrated workflow of low density gravel pack technology applied in OMV PETROM (continuation), Figure 10-52 GP fluid tanks with prepared carrier fluid, http://www.petrom.com 10-107 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 10. SAND CONTROL Figure 10-53 Pumping unit with filters, Figure 10-54 Recorded operation parameters during GP installation, Figure 10-55 Pressure and time recorder, Figure 10-56 Connection of surface lines, Figure 10-57 Using mixed materials for various component of downhole equipment. 10-108 http://www.petrom.com 2012 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 10. SAND CONTROL List of Tables Table 10-1 Failure Analysis Component, Table 10-2 Failure causes and statistics OMV Petrom, Table 10-3 Relative merits of principal sand control methods, Table 10-4 Comparison of Dry Sieving & LPLSA, Table 10-5 US Mesh Size vs. Sieve Opening, Table 10-6 Reservoir sand characterization using PSD analysis, Table 10-7 Gravel Design Criteria (proposed by Shell), Table 10-8 Sand Control Selection in Cased Hole Wells, Table 10-9 Sand Control Selection in Open Hole Wells, Table 10-10 Criteria for optimization of gravel size, Table 10-11 Gravel size selection according to various authors, Table 10-12 Recommended Practices for Testing Sand used in Gravel Packing Operations, Table 10-13 Screen OD – OMV Petrom Best Practice, Table 10-14 Screen slot size in OMV Petrom, Table 10-15 Production (Main) Screen STIMPEX duplex type technical details, Table 10-16 Gravel Absolute Volume, Table 10-17 Required Gravel Mass per Unit of Tubing Length, Table 10-18 Permeability classification, Table 10-19 Washpipe diameter for mechanical packers used in OMV Petrom, Table 10-20 Summary of particle size affects, Table 10-21 Comparison HEC slurry pack and Brine water, Table 10-22 Permeability of Gravel Pack Sands, Table 10-23 Other chemicals specifications Table 10-24 Use range- Baker packers Table 10-25 Use range-Pirom packers Table 10-26 Use range – Moca packers Table 10-27 Use range – Hova packers http://www.petrom.com 10-109 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL Table 10-28 Use range-Schlumberger packers Table 10-29 Use range-Weatherford packers Table 10-30 API Specification for Gravel-Pack Sand 10-110 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 10. SAND CONTROL References 1. OMV Petrom Internal Documents • Standards, Cases- Various Document of GP application in OMV Petrom • Proiect GP 103 Meteu, Proiect GP sWell 682 Oprisenesti, GP 3229 MP Moreni, GP 283 SNP MP Tintea • Sand Control Operation Sequences Procedure and Best practices applied in OMV Petrom SA • OHGP (Re-)completion of old and new wells-OpenHole GP applications-Presentation • AG2 Packer + Gravel Pack Tools –Presentation • ICGP Blejesti 2150- Internal Audit report • Gravel and Screens Specifications used in OMV Petrom • The most frequent problems and statistical analysis of GP application in OMV PetromPresentation • OTIS manual for GP application • GP mechanical Packers (MOCA+Pirom and HOVA) and other completion tools Specifications Details • Proiect FracPck : Well 2153 Blejesti • Project Frac-Pack 110 STANCESTI 2. API Recommended Practice (RP 58), 1995. Recommended Practices for Testing Sand Used in Gravel Packing Operations, 2nd ed. American Petroleum Institute, Washington, DC. 3. Andrews, J., Kjorholt, H. and Jøranson, H.: Production Enhancement from Sand Management Philosophy: A Case Study from Statfjord and Gullfaks. SPE 94511, 2005 4. Addis, M.A., at all: Slotted Completion for Sand Management A Novel Screenless Completion Technique, SPE/IADC Paper, 97415 5. Bale, A., Owren, K. and Smith M. B.: Propped Fracturing as a Tool for Sand Control and Reservoir Management. SPE 24992, 1994 6. Bellarby Johnathan - Well Completion Design - Elsevier 2009 7. Britt, L. K., Smith, M. B., Cunningham, L. E., et al.: Frac-Packing High-Permeability Sands in the Mahogany Field, Offshore Trinidad. SPE 63105, 2000 8. Banman Mark, at all.: Single Trip Multi-Zone Gravel Packing—Case Study at Handil, Bekapai and Sisi-Nubi Fields, IPTC 12388, 2008 9. Corbett, T. and Vickery, E.: Multiple Zone Open Hole Gravel Packing Techniques with Zonal Isolation, IADC/SPE 77214, Technology Conference, Jakarta, September 9-11, 2002 10. Constien, V. G. and Skidmore, V.: Standalone Screen Selection Using Performance Mastercurves. SPE 98363, 2006. 11. Economides, M. J., Watters, L. T. and Dunn-Norman, S., 1998. Petroleum Well Construction. Wiley, England, p. 128. 12. Ellis, R. C.:. An Overview of Frac Packs: A Technical Revolution (Evolution) Process. SPE 39232. Frac-Pack Completion Service, Haliburton, 1998 13. Farias, R., Li, J., Vilela, A., et al.: Best Practices and Lessons Learned in Openhole Horizontal Gravel Packing Offshore Brazil: Overview of the Achievements from 72 Operations. SPE 106925, 2007. 14. Van den Hoek, P.J, Gelikman, M.B, Shel Intl. E&P B.V: Prediciton of Sand Production Rate in Oil and Gas Reservoirs: Field Validation and Practical use, SPE 95715, 2005 http://www.petrom.com 10-111 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 10. SAND CONTROL 15. Jones, C., Tollefsen, M., Metcalfe, P., et al.: Expandable Sand Screens Selection, Performance, and Reliability: A Review of the First 340 Installations. SPE/IADC 97282, 2005 16. Liu, L., Deng, J., Ma, Y., et al.:Single-Trip, Multiple-Zone Frac Packing Offshore Sand Control: Overview of 58 Case Histories. SPE 103779, 2006. 17. Kaiser, T.M.V., at all: Inflow Analysis and Optimization of Slotted Liners, SPE 65517, 2000 18. Markestad, P.: Selection of Screen Slot Width to Prevent Plugging and Sand Production, SPE 31087, 1996 19. Mathisen, A. M., Aastveit, G. L. and Altera’s, E: Successful Installation of Stand Alone Sand Screen in More than 200 Wells – The Importance of Screen Selection Process and Fluid Qualification. SPE 107539, 2007 20. Marques, L. C. C., Paixa˜o, L. C. A., Barbosa, V. P., et al.: The 200th Horizontal Openhole Gravel Packing Operation in Campos Basin: A Milestone in the History of Petrobras Completion Practices in Ultradeep Waters. SPE 106364, 2007 21. Neumann, L. F., Pedroso, C. A., Moreira, L., et al.: Lessons Learned from a Hundred Frac Packs in the Campos Basin. SPE 73722, 2002 22. Ott Willliam K. and Woods Joe D.: Modern Sandface Completion Practices Handbook - WO 2003 23. Penberthy W.L. Jr. & C.M. Shaughnessy: Sand Control, SPE Series on Special Topics, Volume 1, 1992 24. Pashen, M. A. and McLeod, Jr., H. O.: Analysis of Post-Audits for Gulf of Mexico GravelPacked Oilwell Completions Leads to Continuous Improvement in Completion Practices. SPE 65096, 2000 25. Raffn, A. G., Hundsnes, S., Kvernstuen, S., et al.: ICD Screen Technology Used to Optimize Waterflooding in Injector Well. SPE 106018, 2007 26. Saucier, R. J.: Considerations in Gravel Pack Design. SPE 4030, 1974 27. Shenoy, S., Gilmore, T., Twynam, A. J., et al.: Guidelines for Shale Inhibition during Openhole Gravel Packing with Water-Based Fluids. SPE 103156, 2006. 28. Wan Amni Bt Wan Mohamad at all: Temana Field Pilot Implementation A Shift in Sand Control Philosophy To Improve Well Performance, IPTC 12390, 2008 10-112 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 11. STIMULATION BY FRACTURING 11. STIMULATION BY FRACTURING Contents EXECUTIVE SUMMARY ....................................................................................................................... 11-1 11. STIMULATION BY FRACTURING.................................................................................................... 11-3 11.1 Introduction ........................................................................................................................ 11-3 11.2 Fracturing Stimulation Technology Overview .................................................................... 11-3 11.2.1 Selection of Candidate for HDF and Acid Frac in OMV Petrom SA ............................ 11-5 11.2.2 Data Preparation required for hydraulic and acid fracturing design ......................... 11-9 11.2.3 Hydraulic Fracturing (HDF) Key Technology Parameters ......................................... 11-12 11.2.4 Fracturing Fluids and Additives Selection ................................................................ 11-16 11.2.5 Propping Agent Selection ......................................................................................... 11-18 11.2.6 HDF Pre-Job Evaluation Practice in OMV Petrom .................................................... 11-20 11.2.7 Rate Changes During the Job and MiniFrac data interpretations ............................ 11-28 11.3 Fracturing Methods Technology Workflow ...................................................................... 11-30 11.3.1 Propped Fracture Operation Workflow ................................................................... 11-31 11.3.2 HDF Design Process .................................................................................................. 11-32 11.3.3 Model Selection of fracture propagation ................................................................. 11-33 11.3.4 Net Pressure History Matching and Design Correction ........................................... 11-38 11.3.5 Methodology of Acid Fracturing .............................................................................. 11-43 11.3.6 Workflow Design Procedure for Acid Frac ............................................................... 11-47 11.3.7 Planning, Execution and Real Time Control of Well Fracturing ............................... 11-53 11.4 Downhole Completion Well Schematic for Fracturing ..................................................... 11-60 11.5 Surface Equipment for Fracturing..................................................................................... 11-65 11.6 Fluids and Materials Used for Fracturing.......................................................................... 11-68 11.6.1 Fracturing Fluids used in OMV Petrom .................................................................... 11-68 11.6.2 Fracturing Fluid Additives......................................................................................... 11-71 11.6.3 Foams/Energized fluids ............................................................................................ 11-73 11.6.4 Proppants ................................................................................................................. 11-74 11.7 Quality and Safety Requirements for Fracturing .............................................................. 11-76 11.7.1 Quality Assurance and Control of Fracturing Operations ........................................ 11-76 11.7.2 Safety Considerations............................................................................................... 11-80 11.7.3 Personnel.................................................................................................................. 11-80 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 11. STIMULATION BY FRACTURING Appendix 11 - A Surface Equipment for Fracturing (Various service companies). .................... 11-81 Appendix 11 - B Commercial fracturing fluid systems ............................................................... 11-82 Appendix 11 - C Proppant Specifications and characteristics .................................................... 11-83 Appendix 11 - D Fracture Stimulation Checklist ......................................................................... 11-84 List of Figures ................................................................................................................................ 11-88 List of Tables ................................................................................................................................. 11-91 References .................................................................................................................................... 11-92 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 11. STIMULATION BY FRACTURING EXECUTIVE SUMMARY EXECUTIVE SUMMARY: 11. STIMULATION BY FRACTURING No. Strongly Recommended 1. Linear gel is recommended to be in the wellbore and near-wellbore region for the Rate Step Down Test (RSDT) 2. Always use properly selected biocide if water based fracturing fluid will be used for operation. 3. To limit leakoff in high permeability formation during hydraulic fracturing process crosslinked systems should be used. Apply the Rate Step Down Test (RSDT) to accurately make the difference in friction pressure between the perforations and near wellbore friction and to exactly define Fracture Entry Friction (FEF). The magnitude of the FEF components has served as guidance to design and/or modify the placement procedure and treatment schedule, in order to reduce unplanned terminations (screenout) of propped hydraulic fracture treatments. 4. 5. 6. 7. 8. 9. 10. Each step of the flow rate reductions during RSDT should be about 10-20 seconds long what should be enough for stabilization of the flow rate and pressure. It should be avoided to pump a small volume ahead followed by long steps, or, pump first small volume and then a following rates in short steps. Considering downhole stress conditions, reservoir and fluid properties in order to get properly propped fracture with good conductivity use proppant size 16/30 or 16/20 mesh. During Rate Step Down Test once fluid has been pumped through the perforations, bring the rate up to the designed rate. Typically 3-4 abrupt drops in rate are sufficient (2.4, 1.8, 1.2 and 0.6 m3/min or in API units 15, 11.5, 7.5, 3.5 bbl/min. Use Minifrac analysis to get data for estimation the following parameters: • Fracture Closure Pressure and time (Pump-in/Shut-in test) • Fracture Net Pressure (Pump-in/Shut-in test) • Stress profile and fracture geometry using net pressure matching (Pump-in/Shut-in test) • Fluid loss characteristics (total leakoff coefficient Ct and fluid efficiency) with respect to the formation, fracture geometry and fracture parameters (Pump-in/Shut-in test) • Minimum in situ-stress or ISIP (Pump-in/Flow-back test) Proppants should be checked for proper type and size, and meet API specifications ( API RP 56 or API RP60). Sieve analyses from each container should be used to establish size and fines content. In some cases, usually in the final stage of acid fracturing treatment, acid should be pumped below the fracturing gradient pressure (injection in matrix mode). The injection rate should be decreased to achieve required/designed pumping pressure. The reason for following this procedure is to increase the etching of the fracture face near the well bore, thus, increasing the fracture conductivity. To make decision which fracturing method should be applied considering advantages and disadvantages of the conventional fracturing with creating propped fracture and acid fracturing, the best practice workflow shown in Figure 11-39 should be used. http://www.petrom.com 11-1 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 11. STIMULATION BY FRACTURING EXECUTIVE SUMMARY: 11. STIMULATION BY FRACTURING No. 11. 12 Strongly Recommended • During execution fracturing job • Check the proper functioning of the pumps, blenders, monitoring equipment, etc. • Continuously check the quality of the fracturing fluid and the proppant. • Take samples of the fracturing fluid and proppants at all stages of the treatment. • Continuously observe the pressures, rate, density proppant concentration. In case of a premature termination of the job, immediately inform the rig/installation supervisors to take appropriate action (e.g. circulate out any proppant laden fluid). Make sure all (local) HSE requirements are met at all times. EXECUTIVE SUMMARY: 11. STIMULATION BY FRACTURING No. 1. 2. 3. 4. 5. 6. 11-2 Not Recommended at All To start fracturing job operation if the following excess equipment for backup is not available: • 10% excess tank and storage capacity. • 50% backup on power. • 20-50% backup on pumps, depending on the number of pumps. If only one pump will be used for job execution, then one additional pump should be prepared as backup. • sufficient backup on blenders and instrumentation (up to 100%). To continue operation without adjusting the program/design, if the observed pressures deviate significantly from the predicted pressures. To change the designed pumping schedule if supervisor of Service Company and OMV Petrom expert advisor have not been agreed . To locate of the frac/production ports without using properly recorded well logs. To use fracturing fluid which is not compatible with the formation rock and fluids at in-situ temperature and pressure. To continue acid fracturing treatment if injection pressure lowers below the fracture extension pressure. Note: The fracture treatment pressure can be maintained by either increasing pumping rate and/or pumping fluid loss control. http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 11. STIMULATION BY FRACTURING 11. STIMULATION BY FRACTURING 11.1 Introduction Fracturing is the process of injecting a fluid into a well to create tensile stresses in a formation exposed to the fluid pressure, causing local stresses in the formation to exceed the tensile strength of the rock. This creates a crack, or fracture, propagating into the formation from the wellbore as fluid continues to be injected at a high rate. In some formations, acids may be used as the fracture fluid to etch the face of the crack, whereas in others, a proppant such as sand may be injected with the fluid so that upon cessation of pumping and crack propagation, the crack remains a conductivity pathway for fluids to flow from the reservoir into the wellbore. These two processes are referred to as acid fracturing and proppant fracturing. Acid fracturing is applicable in both damaged and undamaged carbonate formations. The initiation and propagation of the fracture should be done by properly selected fracturing fluid and then walls of the fractures are etched with acid to create a conductive flow channel of formation closure. Acid fracturing is a treatment in which the fracturing and etching fluids are acid. When the tensile forces created by the hydraulic pressure of fluid against the rock of the wellbore become great enough, they literally part the rock and start ruptures the fracture. This fracture is then extended from the wellbore by continued pumping of the fracturing fluid. Usually, inert proppant (sand, resin coated sand, intermediate strength proppant, high strength proppant) are proportioned into the fracturing fluid and forced down the tubing or casing into the opened fracture. When the treating pressure is released and the pressure of the surrounding rocks (called "fracture closing pressure") starts to seal the fracture, the proppant holds it open. This permits reservoir fluid to flow along the high conductivity fracture to the wellbore. The fracture conductivity in particular provides the important permeability contrast into that of the reservoir. The larger the ratio of the fracture conductivity (fracture permeability-width product) to that of the virgin reservoir (taking into account the geometry of the generated fracture), the higher the productivity increase. 11.2 Fracturing Stimulation Technology Overview Fracturing is successfully applied in low to moderate permeability reservoirs, whereby the productivity is improved from effectively increasing the wellbore radius. It can be applied in almost any formation, although commonly in carbonate reservoirs acid fracturing is applied. The principal reasons for fracturing a well: • Bypass near-wellbore damage (skin), • Extend a high conductivity flow path into the reservoir, • Alter the fluid flow pattern in the reservoir, • Increase the rate or productivity and/or to improve the ultimate recovery, and • Aid in secondary recovery operations and to assist in the injection or disposal of waste water. If a well has a large skin effect, then a relatively small fracture may increase productivity as much as a few hundred percent. Fracturing is also attractive in very tight sands where the production rates may http://www.petrom.com 11-3 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 11. STIMULATION BY FRACTURING be normally too low to permit economic drainage of the formation hydrocarbon. In these cases long, conductive fractures may help to increase the ultimate recovery of hydrocarbon by extending the time before the economic limit of a well is reached. A neat fluid (“pad”) is pumped to initiate a two-wing fracture and establish fracture propagation. This is followed by a viscous fluid mixed with propping agent (“slurry”), further extending the fracture. The fluid breaks down to a low viscosity, and flows back out of the well. Propping agent prevents the fracture from closing after the treatment. A highly conductive flow path is thus created. A propped fracture can be from tens to several hundred meters long, and it usually has a width of some 5-35 mm. Depending on the formation permeability and the presence of damage, the productivity improvement may be tenfold or more. Hydraulic Fracturing alters the flow pattern around the well by creating a pathway (fracture), which has higher permeability than the formation. Early in the well life, linear or bilinear flow could occur as gas flows from the formation to the fracture (Figure 11-1). Later in the well’s life, pseudo-radial flow occurs. Figure 11-1 Fracturing Alter Flow Patterns Finite conductivity in the fracture or the reservoir is limited to the extent that pressure drop in the fracture occurs. Infinite conductivity means that the conductivity is very large, so, extremely small pressure drop occurs in the fracture. An effective wellbore radius, rw’, can be estimated from skin factor or fracture half-length such that stimulated well production behavior can be approximated with radial flow by using rw in place of rw’. With acid fracturing, no uniform acid etching or differential etching, of the fracture face creates lasting conductivity. Unfortunately, despite rapid technology development, still there is no reliable and accurate prediction of an acid fracturing outcome. Acid fracturing lacks the higher degree of predictability associated with HDF with nonreactive fluids. There are several factors suggest the use of acid fracturing: • A predominantly naturally fractured carbonate formation, potentially leading to proppedfracture complications. 11-4 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 11. STIMULATION BY FRACTURING • • • A heterogeneous formation, with porosity and permeable streaks that are conductive to a higher degree of differential acid etching of the fracture walls. Good formation permeability, but with existing formation damage. A well that will not mechanically accept proppant. Acid fracturing is the more conservative treatment design because proppant is not pumped. The risk of failing to complete the treatment is also much lower. There is no risk of premature screen-out, which can leave the fracturing tubing string full of proppant. Also, there is no risk of proppant flowback, with all its troubles consequences. Acid fracturing is usually less expensive than propped fracturing especially in deeper wells which are often dismissed from consideration because of anticipation that closure pressure will overcome acid-etched fracture conductivity. If effective etched fracture can be created, flow turbulence in the fracture is expected to be less in an open acid fracture than in a fracture that contains proppant. A disadvantage of acid fracturing is that controlling the leak-off rate of reactive acid in a fracture is very difficult. Without benefit of field experience in a particular formation, prediction of etched conductivity and fracture length with a high degree of confidence is not possible. This is due to unknown leak-off characteristics. Acid fracturing must be used only where good differential etching is probable. The rock strength and closure pressure must indicate that good conductivity will remain after fracture closure. Formation mechanical properties and their response to contact different acid types and systems must always be evaluated as best as possible in advance of a treatment program. 11.2.1 Selection of Candidate for HDF and Acid Frac in OMV Petrom SA Well candidate selection for fracturing is a process of identifying wells with low productivity compared to what they are capable of producing, and then examining these wells for mechanical problems. As integral part of the well selection process, the minimum analysis requirement should include evaluation of the designed performance improvement as it is shown on Figure 11-2. Post frac production is the best indicator of performance improvement. Post frac analysis provides data about the fracture size and configuration (length, width and height, and vertical position) which can be used to match the fracture size to the actual performance improvement. If the actual performance gap after fracturing job is equal to predicted, then used model and applied technique of job execution were according to the bottomhole conditions. If the actual performance gap is less than predicted, then either the data used for the design were wrong or the treatment was not placed optimally (TSO mode and in the zone of interest). If the actual Performance gap is more than predicted, the data used for the design were wrong but the treatment was placed optimally. Results of matching procedure for any case should be used for as lessons learned for the better designing and execution of the next fracturing job. The critical step in a process of candidate selection is data preparation and data quality check before and or planning and execution. The need for a fracturing treatment must be determined prior to getting too involved. The factors involved in the decision must include, but should not be limited to, the cost of the treatment vs. incremental productivity and feasibility. http://www.petrom.com 11-5 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 11. STIMULATION BY FRACTURING Figure 11-2 Performance gap evaluation The most important information and data should be collected during the process of the best candidate selection are: • Wellbore inclination survey, • Wellbore configuration, • Casing Integrity, • Completion configuration, • Perforation configuration, • Surface equipment, • Well Logs, • Cement bond evaluation, • Production data analysis, • Near-wellbore damage: Skin, • Pressure Build-Up (PBU) Well Tests, • Previous fracturing treatment data, and • Other operations: Water and/or Gas injection. The implications of fracturing well candidate selection are critical and if a data are not properly gathered, analysed and checked, a risk is high and chances to have unsuccessful operations are increasing. 1. OMV Petrom Best Practice Candidate Selection • • 11-6 Well candidates are usually selected by Asset and they are send for evaluation. Stimulation and Fracturing team is making candidate evaluation in six steps as follows: Step 1 - Make PVT matching, Step 2 - Identify an approximate saturation status and remaining reserve, Step 3 - Identify an approximate damage from history data (skin from steady state flow equation - using Resestim 7 in house made software or Prosper), Step 4 - Predict IP increase after stimulation job based on IP increase after fracturing, http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 11. STIMULATION BY FRACTURING Step 5 - Make production forecast based on material balance, and Step 6 - Estimate operation cost and calculates Cash Flow based on production forecast. If candidate is feasible economically than it is selected. • The general workflow for candidate selection is shown in Figure 11-3. The final step of the process of manual candidate selection involves gathering and organizing well data in order to estimate potential of each individual zone and plan operation according to results of this analysis, as shown in Figure 11-4. Figure 11-3 Candidate selection workflow http://www.petrom.com 11-7 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 11. STIMULATION BY FRACTURING Figure 11-4 Individual Zone/Well Evaluation for fracturing 11-8 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 11. STIMULATION BY FRACTURING 11.2.2 Data Preparation required for hydraulic and acid fracturing design Wellbore Configuration A large number of variables, which are of extreme importance to job design and execution can generally be supplied or obtained from the well file. Included in this list are: Tubular configuration - Is the job pumped through tubing or casing? (additional data required about tubular size, weight and grade, packer depth). Perforations - In existing completions, the perforations are already in place, and an analysis should indicate whether these can be used for the planned fracture treatment, or whether remedial actions are needed (re-perforation, recompletion, cement squeezes, etc.). For newly completed wells, perforation planning for fracture stimulation treatments, should be taken into consideration already in the completion design. If more information is known about how the well was perforated, various analytical model or software like SPAN can be run to determine the actual geometry of the perforations (See Chapter 6). Hole Survey - This is used only for proper frictional and hydrostatics calculations in 3D models (FracCADE). Cement Bond Log (CBL) - A cased hole bond log can be used to verify zonal isolation. A weak bond could allow unrestrained height growth behind casing. Formation Properties Reservoir and rock parameters are required to arrive at a properly calculated design. Permeability (K) - Formation K is a measure of the ease with which a formation permits a fluid to flow through it. While the global term, K, is entered into fracturing design models; it should be noted that effective permeability to oil and water are always lower. Permeability can be estimated using various methods (empirically, derived from porosity and irreducible water saturation- Swi read from logs, using well tests including pressure buildup/drawdowns, short flow tests and drill stem tests, Repeat Formation Test –RFT etc., core testing and analytical procedure/software, like PROSPER, can be used to obtain a well test match from a pressure build-up or drawdown). Porosity (φ) – Formation (φ) is a measure of the ratio of void space in a rock, compared to bulk volume of the rock. The most frequent tools used for porosity estimation are: • Sonic log, density log, or a neutron log can be used provided the formation lithology is known. The depth of investigation for these logs is very shallow, on the order of inches. • Core testing can again be used depending on the sampling method. • Resistivity logs are another tool to be used. Formation Stress (σ) A hydraulic fracture will orient itself in a plane normal to the direction of least compressional stress. This stress is the closure stress (σcl) used in fracturing design. Dynamic measurements can be obtained from shear velocities on a sonic log. This data in conjunction with a bulk density can be used to calculate in-situ stress. The most frequently used test to estimate closure http://www.petrom.com 11-9 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 11. STIMULATION BY FRACTURING stress in OMV Petrom is so called MiniFrac (sometimes called data - or calibration frac, or fracture efficiency). If formation core sample are available, then static laboratory measurements on core can be used to get closure stress. Fracture Gradient (FG) - Obtained by dividing the closure stress by the well True Vertical Depth (TVD). Also, FG can also be estimated with the in-situ correlation in different software (like ProCad, FracCADE). Reservoir Pressure (Pr) - The current pressure of the zone of interest is important in estimating the well performance, production rate and payout of the well. Reservoir Temperature (BHST) - Fluid selection and design primarily needs BHST as a design parameter. Skin (S) - Skin is the pressure drop across the near wellbore matrix. It will have a positive value for damaged zones (up to 20), and negative values for stimulated zones (down to - 7). Skin estimated after fracturing job is direct measure how much the executed operation was successful or not. Oil, Water and Gas Saturation (So, Sw and Sg) - Determining oil, water and gas saturation is one of the basic objectives for proper design fracture job. Gas/Oil Ratio (GOR) - Measured/test production data and history of oil and gas production are the most reliable sources for GOR. Lithology – Various logs could be used to define the material makeup of the rock, to indicate boundaries, correlate zones and give an indication of lithology, particularly, to define shale beds. Zonal production contribution should be evaluated using PLT measurement. Fluid Properties The selection of the actual composition of fracturing fluid, in principle, depends on a number of aspects, such as reservoir mineralogy, well completion, operational considerations, compatibility with reservoir fluids and environmental concerns. Rheology (n’, k’). It is important to consider fluid rheology as a function of time and temperature. Double check rheology tables and make sure that included information extends to temperatures greater than the BHST of the well. If the fluid temperature exceeds the last defined point, it can default to the rheology of the last defined point, which is generally water. The actual n’ and k’ numbers can be obtained from published information (Fracturing Fluids Manual) or from the lab testing of the individual fluid. Because there is little information on the rheology of foamed or energized fluids, these should be calculated from the developed foam rheology spreadsheet as shown in Appendix 11. Wall Building Leak-off Coefficient (Cw) - Cw is a function of polymer and Fluid Loss Additive (FLA) concentration, as well as formation permeability. For non-wall building fluids, Cw should be set to a large number. Total Leak-off Coefficient (Ct) - This is basically the minimum of Cw and Cvc (filtrate and reservoir compressibility controlled leak-off). Cvc is automatically calculated by the program. The only control 11-10 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 11. STIMULATION BY FRACTURING over this parameter on the fluid screen is the leak-off viscosity and it is a function of temperature. For fluids with essentially water leaking off (wall building fluids) the viscosity starts at 1 cp, and decreases with increasing temperature. If the leak-off viscosity is greater than 5 to10 cp, it will begin to become a leak-off control factor. The other important factors are reservoir fluid factors and reservoir properties (permeability, porosity, compressibility, and viscosity). For known formations, an excellent source of Ct is from previous evaluations. When performing a pressure match analysis, leak-off is generally adjusted with only Ct and spurt. If this information is cataloged in the user database, a value of Ct from the database can be very accurate. Total leak-off coefficient is very important for TSO design in high permeable formation requesting sand control. Spurt - For wall building fluids, the spurt is the leak-off that occurs before the deposition of the filter cake. Obviously, this occurs at a faster rate than after the filter cake is in place. It can be visualized as shown in Figure 11-5. Figure 11-5 Spurt valuation Fluid Friction -This is also easily obtained from published information. The most reliable results, however, can be obtained from short field tests (ISIPs in pad). When doing post-job analysis, this information can be very important. If these ISIPs are done on several jobs, at different rates, they can be compiled to generate personal friction curves for the exact fluids which are regularly pumped. When using this method, care must be taken to eliminate “extra pressures” (perforation, tortuosity…) from the database. If these pressures are quantified during the evaluation process, the fluid data is still valid. N2/CO2 Quality - The foam quality (% by volume of gas, excluding proppant) from the fluid design. A decision needs to be made prior to the job, whether constant downhole or surface rate is going to be used. Retained Factor - This is the fraction of the proppant pack permeability that remains after the fluid damage has occurred. The only place to obtain this is from published breaker curves. This number is of great importance when calculating the fracture conductivity. If no breaker is used in a polymer based wall building fluid, which leaves a great deal of residual mass in the fracture, this number can easily approach 0.15, making the default value of 1.00 very inaccurate. Typical values range from (0.5 to 0.75). http://www.petrom.com 11-11 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 11. STIMULATION BY FRACTURING Additives - These will generally be determined from the frac fluid selection. A previous experience in a field can be an important indicator of needed additives. Clay control, iron control, surfactants, nonemulsifiers, etc. are indicated by formation type and previous experience in a particular formation. Other additives such as temperature stabilizers and breakers are determined from the requirements for fluid rheology against time. Additives should be kept to an absolute minimum (apart from some essential additives, like buffers, breakers), and their inclusion should be clearly demonstrated/justified. Proppant A propping agent should be selected that can provide sufficient fracture conductivity under the expected fracture closure stress. The optimum fracture conductivity and thus the appropriate proppant can be estimated using the dimensionless fracture conductivity: CfD = Kfwf/Kxf, where: • • • • Kf- propped fracture permeability (mD), wf – fracture width (mm, inch), K – reservoir permeability (mD), and xf – fracture half length (m, feet). The optimum CfD can range from less than 1.6 to 30 depending on the design limitations and reservoir characteristics. It has been proposed that, when the proppant volume is fixed, the optimum CfD is 1.6 and for gas condensate reservoirs the optimum CfD could be less than 1.6. Values for permeability and retained factor are excluding any fluid effects. The database proppants should generally maintain the retained factor of 1.00, as the permeability is already adjusted based on the closure stress. 11.2.3 Hydraulic Fracturing (HDF) Key Technology Parameters Fracture design considerations included fracture length, fracture conductivity, and interval coverage (staging). An extensive reservoir simulation study are required to determine the optimum fracture half-length and conductivity and predict the future well behavior and production rate. Fracturing pressures In many applications of hydraulic fracturing it is essential to ascertain, if at all possible, the orientation of the fracture. The first question to be answered regards whether or not the fracture is vertical or horizontal. Generally, horizontal fractures are preferred, but in deeper formations they are, as will be evident, most often vertical. One of the important measurements that can help distinguish between horizontal and vertical fractures is the bottomhole pressure measured during fracture treatment. The overburden stress is normally 22.3-24.6 kPa/m (0.99-1.08 psi/ft). If the fracture gradient is less than this, it will be easier to part the earth (formation) than to lift it. In hydraulic fracturing, enough pressure must be applied to initially break down or fracture the formation and enough pressure must continue to be imposed to allow the fracture to continue to grow or propagate. Normally, more pressure is required to initially breakdown a formation than is 11-12 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 11. STIMULATION BY FRACTURING required to propagate a fracture. Once a fracture is formed, the fluid in the fracture acts as a wedge, forcing the fracture to grow. A fracture is more easily created using a low viscosity, penetrating fluid than with a high viscosity nonpenetrating fluid. A penetrating fluid pressurizes a larger area, and the total force on the formation is greater than if a nonpenetrating fluid, which acts only on the area near the wellbore, is used. Pressure behavior during a fracturing treatment is illustrated by Figure 11-6. The fluid injection rate is constant, except that at some time injection is stopped to obtain the instantaneous shut in pressure. The bottomhole pressure is shown versus time from the initial injection of fluid until the treatment has been completed. The surface pressure is, of course, different from the bottomhole pressure because of the weight of the fluid and the friction losses in the wellbore. The critical portions of the pressure history during fracturing shown in Figure 11-6 are: • Breakdown Pressure The pressure required to break down the formation and initiate fracture. This pressure is abnormally high due to the concentration of stresses around the wellbore at the time of drilling. Sometimes this pressure is used incorrectly to calculate formation fracture gradient. • Fracture Extension (Propagation) Pressure The pressure required to continually enlarge the fracture; • Instantaneous Shut in Pressure(ISIP) The pressure response at the moment pumping stops, when the extension pressure has an instantaneous drop, which is a measure of the total friction pressure; • Fracture Closure Pressure The pressure recorded at time the fracture closes. The fracture closure pressure is equal to the minimum effective stress and is the pressure that should be used to calculate the true formation fracture gradient. • Net Fracture Pressure The pressure which is differential between instantaneous pressure and fracture closure pressure. The instantaneous shut in pressure measured by stopping the flow will depend on the width of the fracture at this point and the pore pressure surrounding the fracture. If large quantities of fluid have been injected and the fracture width at the wellbore is large, then a larger shut in pressure will be observed. If it is desired to measure the intrinsic tectonic stress, the shut in pressure should be measured after only a small amount of low viscosity fluid has been injected to create a fracture. At this stage the fracture width will be narrow and will have little effect. Even if larger quantities of fluid are injected, the effect of fracture width is normally less than 30 bars. After shut in, stresses in the earth squeeze the fluid in the fracture until the fracture walls close on the proppant or on the etched walls of an acid fracture. When the walls close, and support the earth's stresses, the pressure will decrease rapidly as more fluid leaks off into the formation. The described pressure behavior is highly idealistic. Seldom all the described pressures will be observed during a fracture treatment. For example, if the reservoir had been previously fractured, there may not be any difference between breakdown pressure and fracture propagation pressure. If the reservoir pressure is very low, the well will go on vacuum when the fracture closes, and a static reservoir pressure will not be measured at the surface. If Pisip is the instantaneous shut in pressure measured at the surface, then the bottomhole shut in pressure (Pbisip) is given by: http://www.petrom.com 11-13 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 11. STIMULATION BY FRACTURING Where: 𝑃𝑏𝑖𝑠𝑖𝑝 = 𝑃𝑖𝑠𝑖𝑝 + 𝜌𝑓𝑙 ∙ 𝑔 ∙ 𝐻𝑚𝑝 (11-1) Hmp is the formation depth (to the middle of the perforated interval). This equation is precise because when flow is stopped, the friction pressure vanishes. Fracture Gradient (FG) can be calculated using Pbisip as follows: 𝐹𝐺 = 𝑃𝑏𝑖𝑠𝑖𝑝 ⁄𝐻 𝑚𝑝 (11-2) Figure 11-6 Idealized bottomhole pressure during fracturing job Fracture Geometry Available computer programs for fracture modeling allows the user perform sensitivity studies with a design limit on either length or volume. Varying the fluid pumped, height growth, leak-off, modulus, pump rate, spurt loss, and formation toughness yields comparisons and sensitivities of the input values. If good data is available for some of those parameters, it is not required to sensitize on them. Sensitizing should only be used for data that is questionable, or is a limiting factor in the design; such as pump rate. This module can also be used in the post-job evaluation for a quick check of the fracture geometry. If delta Pnet is known, the geometry can quickly be analyzed. To use 3-D fracture models, vertical reservoir and rock mechanical properties must be developed. Assigning properties to layers is the critical step in the process of developing 3-D fracture model data sets. If these properties are properly measured and estimated, the data set will be both useful and accurate. The profiles in Figure 11-7 and Figure 11-8 are examples of this process. Zone information and changes in lithology should be taken from available well log data (Gamma Ray log). Rock types can be picked from software that roughly describes formation characteristics. This will assign default values for Poisson’s ratio, Young’s modulus, and Fracture Toughness. Assign pore 11-14 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 11. STIMULATION BY FRACTURING pressures to each zone based on reservoir pressure gradient for pay zone. If the well has been producing the current pore pressure should be used in the pay zone and original pressure to create the gradient. Use Minimum Insitu-Stress Correlations to calculate stresses. Figure 11-7 Well lithology, permeability/thickness product and cumulative hydrocarbon in place Figure 11-8 Well lithology and mechanical properties distribution http://www.petrom.com 11-15 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 11. STIMULATION BY FRACTURING 11.2.4 Fracturing Fluids and Additives Selection The purpose of fracturing fluids is basically: • To transmit the pressure from the surface to the bottom of a well, to initiate a fracture, • To hydraulically extend (or propagate) the fracture into the formation, • To transport and distribute the proppant along the fracture, and • In acid fracturing, to create unevenly etched flow channels. The fluids selected for a fracturing treatment can have a significant influence on the resulting propped fracture length and fracture conductivity. Fluids that leak-off rapidly into the formation will not extend the fracture to the desired length, and may result in a premature screen-out. Moreover, if a significant amount of residue of the gelled fracturing fluid remains either in the proppant pack, and/or as a filter cake at the fracture face, the fracture conductivity and production performance of the fracture may be considerably less than the design value. When choosing a fluid, it is important to take into consideration the well bottomhole static temperature and formation properties. Some conditions to consider are: water sensitivity, low reservoir pressure, extra viscosity required, high proppant pack conductivity, short length (< 90 m /300 feet), and low conductivity. These should not be the only factors used in making a decision. The fluid selection chart in Figure 11-9 is a good gauge of where to start. Choose a fluid which will give large conductivity and the lowest polymer damage. Optimize according to the leak-off coefficient (Cw, Ct), retained factor, whether or not flowback is in the design, good clean-up, Bottomhole Static Pressure (BHSP), Bottomhole Pressure (BHP), formation sensitivity, friction data, and formation permeability (K). Extensive laboratory rheology (Fann-50) and retained conductivity tests should be performed on a variety of fluid systems, including both borate and zirconium crosslinked fluids, to identify the optimum fluid for the treatments. Reservoir brine, freshwater and seawater base fluid systems also can be considered. Seawater has the advantage of minimizing logistical issues and is less expensive particularly in offshore hydraulic fracturing operations and this is usual case in OMV Petrom. Sometimes, depending of the seawater composition the lower viscosity can be obtained in combination with polymer and, in that case higher polymer concentration is required, particularly for the wells with higher temperature (> 150 °C). In addition, at such conditions (high temperature) there is possibility of scales precipitations. Actual fracturing fluids will always leave some residue in the proppant pack in the form of polymer residue, unbroken gel particles, fluid-loss material, filter cake etc., thus reducing the conductivity of the propped fracture. The problem is most pronounced when the volume of residue from the polymer is high, when polymer concentration is high, when the concentration of proppant in the closed fracture is low and when the stress on the fracture is high, causing lower porosity. In laboratory testing of several fluids, the reduction in fracture flow capacity was found to be greatest for crosslinked HPG fluids and least for emulsion fluids, as shown below in Table 11-1. The damage percentages are dependent on temperature, and the numbers in Table 11-1 were determined at around 60°C. Since higher proppant concentrations increase proppant volume, while simultaneously reducing the fluid volume, fluid residue plugging is mitigated by higher proppant concentrations. 11-16 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 11. STIMULATION BY FRACTURING Figure 11-9 Fracturing Fluid Selection Workflow http://www.petrom.com 11-17 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 11. STIMULATION BY FRACTURING Table 11-1 Proppant pack damage from fracturing fluids 11.2.5 Propping Agent Selection Propping Agents are required to “Prop Open” a created fracture and to increase flow capacity. Choosing a proppant depends on closure pressure (Pc), mesh size, mean diameter (Dpmin), preferences, cost, availability, compatibility, pack porosity and permeability. Optimizing Dimensionless Fracture Conductivity (Fcd) is a must. The increase of oil/gas production after hydraulic fracturing can be achieved only if the fracture is adequately filled with proppant and has a designed conductivity which is strongly influenced by the following proppant properties: • High Strength, • Size, sphericity and roundness, • Corrosion Resistant, • Low Specific Gravity, The most frequent proppant types used for fracturing operation are: • Quartz Sand, • Sintered Bauxite, • Ceramic Material, and • Resin Coated Sand, Bauxite or Ceramics. Fracture permeability is a function of proppant type, proppant concentration, reservoir temperature, fracture closure stress and the amount of fines, gel residue, etc. that are in the proppant pack. The key criteria for selecting the proper proppant size is to get high conductive fracture. The best results in OMV Petrom have been obtained with proppant size 16/30 or 16/20 mesh. The recommended proppant selection workflow is shown in Figure 11-10. 11-18 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 11. STIMULATION BY FRACTURING Figure 11-10 Proppant selection workflow http://www.petrom.com 11-19 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 11. STIMULATION BY FRACTURING 11.2.6 HDF Pre-Job Evaluation Practice in OMV Petrom Design for proper fracturing operation evaluation The key to successful evaluation requires proper treatment planning and execution. The ability to complete an accurate evaluation depends on the quality and quantity of data. In addition, requiring rigorous treatment practices on every treatment ensures that the proper data is gathered regardless of whether or not an evaluation is performed on location. There are the different tools available on location to aid in the analysis process. These pumping practices, used in conjunction fracturing software modeling, provide valuable pieces of information regarding the formation. These tools are Step Rate Test (SRT), Rate Step Down Test (RSDT) and Mini Frac test. Not only can a successful and correct pressure match be obtained using these tools, but the success of the treatment can also be maximized with effective “on location” evaluation. In some cases, if it is needed, after perforating and before fracturing, acid breakdown can be performed to ensure that injection is established and that the perforations are open. Particularly, acid breakdown of perforation can be effective in carbonate formation and sometimes is used as proved best practice in OMV Petrom. Standard practices usually involve establishing an injection rate before any acid are pumped. Also, this could be a good opportunity to perform a quick Instantaneous Shut-In Pressure (ISIP). After the initial break, increase the rate to 5+ BPM, and after the pressure has stabilized, shutdown and calculate the formation fracture gradient and a rough estimate of closure. If at all possible, an ASCII data file with time, rate and pressure should be generated. Regardless of which company pumped the breakdown, the operator should always have this information. The breakdown is also an ideal time to perform a flow back test. After the balls have been wiped or surged, start the step-rate/flow-back test. This technique will be discussed in the next section. Step Rate Test Exact rates are not important when performing a step rate test, constant rates are. This test is usually done with workover fluid such as 2% KCl, brine or slickwater, however gelled fluid can also be used. It is desirable to have a uniform weight fluid in the hole, so that hydrostatic pressure is known. In high permeability areas crosslinked systems may be used to limit leak-off. This test is recommended as the first for determining Fracture Extension Pressure (FPE). The step rate ensures that anomalous pressures are not encountered during the closure test. Performing a valid step rate test ensures that the zone has been fractured, provides an upper bound of closure and defines the required rate for fracture extension. For purposes of defining closure, the duration of the individual steps should be equal. The time span does not have to be long. One or half minute is sufficient to change rates and level of pressure. Depending on the formation permeability the rate at which the fracture propagates is usually greater than 500 lit/min (3 bpm), but in tight rock the rate is generally much smaller. The recommended rates are 80, 120, 160, 320, 480, 640, 960, 1280, 1600 lit/min (0.5, 0.75, 1, 2, 3, 4, 6, 8, 10 bpm). The rate should be adjusted depend on injectivity characteristics of formation. Such a wide range of rates typically ensures that at least three rates fall above and below the fracture extension pressure as shown in Figure 11-11. The best the time at each step should be the same length. The last rate should be held for 5 to 10 min to ensure enough fluid to perform an adequate flow back. The break point of the step-rate test in the curve or change in slope is the Fracture Extension Pressure (FEP), which is larger than the closure pressure because of fluid friction in the fracture and a finite resistance to extension. Intersection between straight line, drawn by regression between points of curve before slope change, and Y axis gives as an approximate value of reservoir pressure 11-20 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 11. STIMULATION BY FRACTURING (Pr). Intersection between straight line, drawn by regression between points of curve after slope change, and Y axis gives as an approximate value of Fracture Closure Pressure (FCP). Figure 11-11 Step Rate Test Once an adequate amount of data has been collected, the data can then be interpreted by standard pressure transient analysis for the permeability and skin factor. Rate Step Down Test The rate step down test is highly valuable in determining near wellbore pressure effects such as tortuosity or perforation friction. Load the hole with a known fluid (i.e., 2% KCl, slikwater, preferable linear gel with low gelling agent concentration). Linear gel is recommended to be in the wellbore and near-wellbore region for the RSDT, because, the viscosity is not affected as much by the shearing rate. There are cases where a fracture cannot be initiated; because of the low efficiency of linear fluids (linear gels), and only short superficial fractures can be created. In such cases, the fracture entry geometry is very different, so, crosslinked gel provides the necessary efficiency, thus, using crosslinked gel is recommended instead of linear gel. In cases where downhole pressure is not available, it is recommended to overdisplace with linear gel prior to starting the RSDT. Only after linear gel has passed the perforation near-wellbore area the RSDT can be started. Friction numbers are extremely important in the analysis, so it is imperative that it is known what is in the hole and nearwellbore in order to correctly use models for calculating all friction components (wellbore, perforation and nearwellbore zone). Also, both, density and viscosity of the fluid used for RSDT must be uniform, so the hydrostatic pressure and the wellbore friction will be constant and can be used for proper matching of calculated and measured Total System Friction (TSF). Once fluid has been pumped through the perforations, bring the rate up to the designed rate. Typically 3-4 drops in rate are sufficient (2.4, 1.8, 1.2, 0.6, 0 m3/min or in API units 15, 11.5, 7.5, 3.5 bbl/min). It is not required that all flow rate reductions be equal, however, they have to be abrupt. It is easiest and most convenient to pump with four pumps at about equal rate each, and take out one pump at a time. Drop the rate until the pressure settles, repeat until the rate is zero (this is mandatory and record the ISIP which is used in calculating TSF. Also, to record hydraulic transient harmonic response (water hammer), the last rate must be zero. The procedure is shown in Figure 11-12. http://www.petrom.com 11-21 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 11. STIMULATION BY FRACTURING If downhole pressure gauges are not used, then Bottomhole pressure should be calculated. For calculation of BHP an accurate determination of friction losses in tubing is necessary. In many experiments developed worldwide, if a BHP gauge was used, revealed that real friction losses in tubing are in the range of 30-60% (most frequently around 50%). To be sure that friction losses in tubing is not overestimated, bottomhole pressure can be compared with BHP corresponding to ISIP which is not depending by friction. Minimum BHP during pumping (at minimum rate) should be bigger that BHP at ISIP. Calculated or measured bottomhole pressure minus ISIP for all rates gives the near wellbore friction and perforations frictions versus injection rate. Figure 11-12 Rate Step Down Test procedure Each step of the flow rate reductions should be about 10-20 seconds long what should be enough for stabilization of the flow rate and pressure. Fracture geometry should change very little during the RSDT. It should be avoided to pump a small volume ahead followed by long steps, or, pump first small volume and then a following rates in short steps. Therefore, the volume pumped prior to initiation of the abrupt flow rate reductions must be fairly large followed by abrupt flow rate changes. The improper and proper way RSTD design is shown in Figure 11-13. Figure 11-13 Improper and proper design of RSDT The RSDT is used to accurately make the difference in friction pressure behavior between the perforations and near wellbore friction and to exactly define Fracture Entry Friction (FEF). Nearwellbore friction is a result of near-wellbore fracture tortuosity, existence of multiple fractures in near-wellbore zone and perforation connectivity with fracture. The magnitude of the FEF components has served as guidance to design and/or modify the placement procedure and treatment schedule, in order to reduce unplanned terminations (screenout) of propped hydraulic fracture treatments. 11-22 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 11. STIMULATION BY FRACTURING The perforation friction changes with the square of the flow rate, whereas the near-wellbore friction changes with the square-root of the flow rate. As shown in this figure, this difference can be determined when several abrupt flow rate changes are applied to accurately measure near-wellbore friction. It cannot be predicted, but only can only be quantified field observations. The general empirical equation to quantify near-wellbore friction is: Where are: • • ∆𝑃𝑓𝑛𝑤𝑏 ≅ 𝐾 × 𝑄𝛽 (11-3) K – constant, and β –exponent between 0.4 and 2 (OMV Petrom best practice: 0.5-0.6) As it is shown in Figure 11-12, perforation friction is dominant over near-wellbore friction. In the case that near wellbore friction is larger the entire plot will be above the perforation friction plot. In the perforation friction dominated regime, it can be seen that the bottomhole pressure changes most for the higher flow rates. All of these cases are shown in Figure 11-14. Ref 1 Figure 11-14 Perforation friction dominates (left side) and near-wellbore friction dominates (right side) • • • If the rate exponent equals or greater than 2.0 then near wellbore friction is purely a function of perforation damage and well need to be reperforated. If the rate exponent equals or less 0.5 then near wellbore friction is purely a function of tortuosity (near wellbore fracture restrictions). In this case a proppant slug should be pumped during minifrac in order to check the formation response to proppant injection. If the rate exponent is in between 0.5 and 2 then, both, near wellbore friction and perforation damage exist. As it can be seen, the value of the near-wellbore friction coefficient exponent, β, is not always 0.5. For shallow depth (less than 1200 m) it is slightly larger than 0.5, for hard rock and high stress conditions it is less than 0.5. For tough rock at great depth, the value of β = 0.5 is used as good http://www.petrom.com 11-23 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 11. STIMULATION BY FRACTURING approximation. If the inertial effect is high, what is usually case with complex fracture geometry and high injection rate then rate β is higher than 1 and it is very difficult to distinguish perforation friction and near-wellbore loses. In such cases the plots of near-wellbore friction is concave upwards and the most of pressure loss will be attributed to perforation friction what cause that pressure loss due to near-wellbore friction will be underestimated and potentially erroneous operation decision can be made. Results of proper FEF interpretation are used for decision making timely and properly in order to prevent or reduce unplanned fracture termination (screenout) and therefore to reduce risk that operation be technically and economically unsuccessful. Additionally, one FEF can be used for diagnostics of proppant slug response and hydraulic transient response (water hammer). Generally each field and formation has its own special characteristics; so, it is advisable to establish guidelines by field, but as well as by geologic formation. The proposed general guidance based on analysis of over 400 RSDT from all around the world is shown in Table 11-2. Table 11-2 General guideline based on ranges of FEE component values Common practice is that step rate test is followed rate step down test, as can be seen for one selected case in OMV Petrom in Figure 11-15. Figure 11-15 Step Rate and Step Down test sequences MiniFrac test The most important test on the location before the main treatment is known as a Minifrac (sometimes called Data - or Calibration frac, or Fracture Efficiency) is a series of pump-in tests at or near main treatment rate followed by a shut-in period or flow-back period, as shown in Figure 11-16. The best practice in OMV Petrom is to use Pump-In/Shut-in test, as is shown in Figure 11-17. Various rates and fluids can be used depending on downhole conditions and some technical constraints at the surface. The tests are performed on a formation to determine hydraulic fracture treatment design parameters. 11-24 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 11. STIMULATION BY FRACTURING Figure 11-16 Typical Micro test Data* *1)Formation Breakdown; 2) Propagation; 3) Instantaneous Shut-In; 4) Closure Pressure from Fall-Off; 5) Reopening; 6) Closure Pressure from Flowback; 7) Asymptotic Reservoir Pressure; 8) Closure Pressure from Rebound The design goal for the minifrac is to be as representative as possible of the main treatment. To achieve this objective, sufficient geometry should be created to reflect the fracture geometry of the main treatment and to obtain an observable closure pressure from the pressure decline curve. The most representative minifrac would have injection rate to the main treatment and fluid volume injected as pad volume which is in the most cases equal to the maximum 50 m3. In practice, several conflicting design criteria must be balanced (created fracture geometry, designed proppant mass, damage to the formation, a reasonable closure time, and cost of materials and personnel) in order to optimize fluid volume required for executing minifrac. The purpose of Minifrac analysis is to get data for estimation the following parameters: • Fracture Closure Pressure and time (Pump-in/Shut-in test). • Fracture Net Pressure (Pump-in/Shut-in test). • Stress profile and fracture geometry using net pressure matching (Pump-in/Shut-in test). • Fluid loss characteristics (total leak-off coefficient Ct and fluid efficiency) with respect to the formation, fracture geometry and fracture parameters (Pump-in/Shut-in test). • Minimum insitu-stress or ISIP (Pump-in/Flow-back test). Also, by interpretation of the MiniFrac data some additional information about reservoir like permeability and reservoir pressure can be obtained. These field calibrated parameters are derived prior to the main fracture treatment, to allow optimization of its design. Therefore, a minifrac test is always carried out prior to a hydraulic fracture treatment. Although downhole data is preferred during a minifrac test, accurate surface pressure recording is adequate. This will reduce costs and avoid the risk of cable parting due to viscous drag forces by the frac fluid pumped down. The surface pressure data can be entered into evaluation software packages. A minifrac should be performed by pumping the same fluid to be used for the main fracture treatment at the designed rate. The injection rate during minifrac test should be maintained at constant level and for the most performed jobs for off-shore wells injection rate was not higher that 3000 lit/min, primary because of technical limitation of the pumps injection capacity. http://www.petrom.com 11-25 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 11. STIMULATION BY FRACTURING Once the fracture has been initiated, it will propagate with a lower fracturing fluid pressure, since the stress distortion will rapidly vanish away from the borehole. The downhole propagation pressure must be higher than the sum of the effective horizontal stress and the reservoir pore pressure. After pumping is stopped, the wellhead pressure drops rapidly to the ISIP. Pressure losses due to friction are then eliminated. Figure 11-17 Typical Micro test Data The pressure decline is monitored to determine the closure pressure of the perforated interval. Leak-off coefficient can also be determined by analyzing the pressure falloff data A MiniFrac can be done to get an approximation of the stresses downhole. If the reservoir is multizone and if several intervals are perforated then the pressure response will yield the closure pressures and associated fracture gradients for the all of the zones. Once all of the stresses are known, the stresses within the zones in the job design are much more reliable, and it is important that they are not vastly modified at any time during the design or evaluation process. Flow Back Test This test, in conjunction with a step-rate test, is the preferred method of determining the closure pressure. Flow back should start immediately after the step rate test. A typical rig up will employ a high pressure flow meter to ensure a constant rate. This rate is typically 1/4 to 1/6 the final pumping rate, and must remain constant. A variable choke and a visual display of the flow allows the individual flowing the well back to continuously monitor the flow rate to make any changes necessary. The combination of injection and flow back should be repeated in order to validate the first test, although the step rate does not have to be done if a clear fracture extension pressure and closure were determined in the first test. In addition to a choke and a flow meter, another configuration may be to utilize a fixed choke, pressure gauge and a variable choke. The gauge is placed between the two chokes and the pressure is kept constant. Workflow shown in Figure 11-18 gives detailed sequences of HDF data preparation and required test for planning, designing and execution of HDF operation. 11-26 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 11. STIMULATION BY FRACTURING Figure 11-18 HDF data preparation workflow http://www.petrom.com 11-27 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 11. STIMULATION BY FRACTURING 11.2.7 Rate Changes During the Job and MiniFrac data interpretations Whenever there are designed rate changes during a frac job (i.e., step-rate-test, step-down-test or step down at the end of the job, or rate changes during the pumping of the job), they should be made as quickly as possible. These rate changes should be discussed during the pre-job meeting to ensure validity of the data, and so the pump operators will understand the necessity and importance of quick rate changes. Exact rates are not the goal, constant rates are. If a particular rate is desired, get as close to it as quickly as possible and leave it alone until it is time for the next rate adjustment. The same holds true during the pumping of the frac job and the step-down at the end of the job. The rate changes need to be as quick and clean as possible. MiniFrac data interpretations Various methods developed for transient well test analysis are used for interpretation of recorded data during execution of MiniFrac test. The most frequent used are: • Square Root of Total Time/Time Since Shut-in, • G-Function Plot, • Horner Plot, and • Log-Log Diagnostics. Square Root of Total Time/Time Since Shut-in Figure 11-19 illustrates pressure decline during decline versus the square root of pumping time plus shut-in time. This plot proves to be a more accurate analysis for closure when non-wall building fluids are used. With field data, closure can be approximated by the intersection of the two straight lines. Square root of total time is used to magnify slope changes. Figure 11-19 SQRT MiniFrac data analysis G-Function Plot This plot (Figure 11-20) is used to analyze the pressure decline after shut-in and to assist in determining closure pressure and closure time. Fracture closure is indicated by a deviation from the straight line. This plot graphs the range of points defined as decline on the job data plot. 11-28 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 11. STIMULATION BY FRACTURING Figure 11-20 G-Function Plot for MiniFrac data analysis Theoretically, the fracture closure period for a pressure independent wall building fluid will appear as a straight line on the G-function plot. The slope of this line is directly related to the fluid loss coefficient, closure time is related to fluid efficiency and the net pressure at shut in is related to Young's Modulus and gross fracture height. Three options are available on this plot to determine the slope of the straight line portion. Graphic line fit allows the user to place the tangent at any point on the curve. Forced range allows the user to fit the line between adjustable max and min points on the curve. The 3/4 rule places a tangent at a point 3/4 of the way between ISIP and the user input estimate for closure. This is the preferred method as it takes into account non-ideal behavior. P* is the Nolte Match Pressure, and is proportional to the leakoff coefficient and is determined from the decline analysis. 𝑃∗ = 𝜋𝐶𝐿 𝑟𝑝 𝑡 0.5 2𝐶𝑓 (11-4) Where: • CL – fluid-leak-off coefficient, • rp – ratio of permeable (or fluid loss) are to fracture area, • t – injection (pumping) time, and • cf – fracture compliance (constant of proportionality expressing depends of fracture net pressure and fracture width – Wf=cfPnet). Fluid efficiency can also be generated from the G-Function plot, as it is a function of closure time derived from P* and the net shut-in pressure Horner Plot The pressure during decline versus the log of the Horner time, which is defined as [the pumping time (tp) plus the time since shut-in (Dt shut-in)] divided by the time since shut-in (Dt shut-in), is shown in Figure 11-21 illustrates Horner plot. This plot is used to identify radial flow which occurs after fracture closure, and to provide a lower bound of closure. This point is located at the point at which http://www.petrom.com 11-29 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 11. STIMULATION BY FRACTURING the curve deviates from a straight line. If radial flow is observed, the data will not deviate from a straight line, and this line can be extrapolated to obtain an estimate of the reservoir pore pressure. Figure 11-21 Horner plot for MiniFrac data analysis Log-Log Diagnostics This plot considers the difference from the shut-in pressure and the pressure derivative, plotted against the time since shut-in (Δtshut-in). This plot can be used to identify closure pressure by investigating linear flow through the fracture after shut-in. When using field data, closure can be obtained from the intersection of two straight lines, with a straight line on both the shut-in pressure and the pressure derivative, as shown in Figure 11-22. Figure 11-22 MiniFrac Log-Log Diagnostic plot 11.3 Fracturing Methods Technology Workflow After the selection of suitable candidates for a fracturing treatment and preparation of the data required for designing HDF, a number of steps have to be considered by the designer, when planning the "ideal“ fracturing treatment. Generally speaking, the design of fracture treatments has three basic requirements. One is to determine what oil or gas rates and recoveries might be expected from various fracture lengths and fracture conductivities for a given reservoir. The second is to determine 11-30 http://www.petrom.com OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Workover Best Practices 2012 11. STIMULATION BY FRACTURING the fracture treatment design requirements to achieve the desired fracture geometrical parameters (lengths, width and height) and conductivities. The third is to maximize economic returns. 11.3.1 Propped Fracture Operation Workflow 1. Propped fracturing design elaboration. • Proppant and fluid is selected based on reservoir stress and rock proprieties. • Lab testing; Proppant crush test, Resin coated proppant hardening test, Mechanical rock proprieties testing on core, and Fluid test; Crosslink test at average temperature in tubulars (for crosslinked fluid), Rheology test, Breaking test, Caring capacity test, Rehealing after sharing test, Compatibility test with reservoir fluid, and Retained permeability test on core. • Propped fracture design tool. Based on computer simulation the best pumping schedule is chosen. 2. Economic evaluation. Based on more accurate cost estimation and production forecast cash flow is calculated. 3. Program elaboration. Program has the following main chapters: • • Well and reservoir data. Well preparation recommendation (workover plan, tubing movement and stress analysis / see Chapter 5). • Pumping schedule, job hydraulic parameters, simulated fracture parameters. • Surface facility placement and technical setup (P and ID). • Production forecast and recommendation for production regime. • Cash flow. 4. Job execution and QA/QC. • Tank and chemicals inspection. • Fluid retesting on well location. • Execution of SRT/RSDT - Near Wellbore Friction interpretation in order to define an optimum operating parameters in order to avoid screenout during execution SDT. • Main frac execution; Real time net pressure matching, Fluid sample inspection and breaking test, and http://www.petrom.com 11-31 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 11. STIMULATION BY FRACTURING Material balance checking for on fly pumped chemicals (difference must be less than 10%). 5. Report elaboration. 6. Production monitoring and history matching for different fracture geometry (it needs 6 months of production). 7. Cash flow monitoring function of production data. The general workflow developed using OMV Petrom best practices examples are shown in Figure 11-23. Figure 11-23 General Workflow for Well Fracturing Design Process 11.3.2 HDF Design Process The general workflow of HDF design process (Figure 11-28) shows that data preparation, design model selection, production increase estimation and economic evaluation are four steps that should be applied to achieve the final objective of design process. These steps are: Data preparation (Step Rate Test, Rate Step Down Test and Mini Frac) 11-32 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 11. STIMULATION BY FRACTURING Model Selection (fracture propagation model, proppant selection and transport model, heat transfer simulation, wellbore hydraulic and perforation model, fracturing fluid and additives selection, post fracture well performance evaluation), Fracture Parameter Optimization, Sensitivity analysis and Economic and Risk Evaluation As the fracturing is one of the most costly workover/stimulation operations one of the key objectives is to design a fracturing treatment with optimized values producing the most cost effective job. By inputting the design constants half-length and geometry model, and varying formation permeability, maximum proppant concentration, fluid type, proppant type, fracture height, fracture length, leak-off coefficient, retained proppant permeability and maximum pump rate, optimize the design vs. cost. If any variables are constrained, especially the costly variables they will strongly impact NPV and cash flow analysis should be done to choose the most effective fracture parameters. 11.3.3 Model Selection of fracture propagation A model must be chosen that fits the formation properties and at the same time, the formation stresses have to be known to choose a model. The fracture propagates perpendicular to the axis of least stress. An experienced designer can estimate the geometry model from logs and field history. The model that gives the smallest width is the proper choice. This will be the model generating the least amount of net pressure. Horizontal - the overburden stress is less than in-situ stresses causing horizontal growth, confined to a single zone. The fracture initiation is from the wellbore diameter. This is the primary model when the depth is approximately less than 600m (2000 feet). In order to determine the most likely fracture geometry, ideally, detailed information (in-situ stress and mechanical properties measurements at top and bottom for relevant zones) is required. This can be obtained from, minifrac tests or from logs. Also, (extended) casing leak-off tests may provide information on in-situ stress levels. The calculation of a detailed treatment design can be done with choosing appropriate fracture model and software. Two dimensional models are closed form analytical approximations assuming constant and known fracture height. For petroleum engineering applications, two mutually exclusive models have been used. For a fracture half length much larger than the fracture height (xf > > hf), the Perkins and Kern (1961) and Nordgren (1972) or PKN model is an appropriate approximation. The net pressure varies along the height resulting in elliptical width development. It is a fixed height 2-D model where the properties of all zones are averaged together. The fracture half-length is much greater than the fracture height. This model is typical for thin zones For xf < < hf the appropriate model has been presented by Khristianovic (h) and Zheltov (1955) and Geertsma and de Klerk (1969). This is well known as the KGD model. The fracture height remains constant, net pressure decreases and the properties of all zones considered are averaged together. The fracture half-length is much less than the height. This model is used for very thick zones. A limiting case, where hf = 2xf, is the radial or "penny shape" model. The fracture height, hf, used here is the dynamic value, that is, the fracture height at the time that the fracture length is equal to xf . http://www.petrom.com 11-33 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 11. STIMULATION BY FRACTURING Two general groups of models are available: two dimensional (2D) and three dimensional (3D) models. The most frequently used 3D models are: • Full 3D models (all aspects of fracture initiation and propagation are included) • Planar 3D models (Fracture grows perpendicular to horizontal stress) • Pseudo 3D models Lumped models Cell-based models Full 3D model The fracture is discretized, and within each block calculations are done based on the fundamental laws and criteria for propagation. The fracture is allowed to propagate laterally and vertically, and change plane of original direction, depending on the local stress distribution and rock properties. Such fully 3D models require significant amounts of data to justify their use and they are extremely calculation intensive. Full 3D modeling is the best option for modeling fracture propagation in horizontally and highly deviated wells because the fracture initiation, usually aligned with the well trajectory, is likely to be different from the direction of fracture propagation, which must be normal to the minimum, "far field" stress. The key features of the Full 3D fracturing are: • 3D elastic equations solved using finite element methods (Figure 11-24), • 2D fluid flow coupled with linear elastic equations and solved with finite difference models, • Fracture shape evolves with both time and space, • Need detailed description of layers to take full advantage of these models, and • Need powerful computer to solve real problems efficiently. Figure 11-24 Full 3D model grid Planar three dimensional (PL3D) Commonly used PL3D models available on market are: GOHFER (Grid Oriented Hydraulic Fracture Extension Replicator), a planar 3D finite difference model of Marathon Oil, marketed by STIM-LAB, Inc..), TerrFrac (Arco) and HYFRAC3D. 11-34 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 2012 11. STIMULATION BY FRACTURING Pseudo 3D model The p-3D models allow vertical fracture migration along the fracture path, and this migration depends on the stress contrast between the target and adjoining intervals, as it is shown in Figure 11-25. Figure 11-25 Lumped p-3D model Basically, there are two common used pseudo 3D models, lumped and cell based. Lumped p-3D frac model The model was proposed and developed by Keck et al. Model used 3D integral equations for crack opening and fluid flow. The fracture horizontal length and wellbore vertical tip extensions are calculated at each time step. Vertical profile assumed to be two half-ellipses joined and all variables are lumped into coefficients that are spatially averaged along ellipses which are shaped to match these points. 2D models are used to for fluid flow modeling and proppant transport (convection and settling). Lumped p-3D model has capabilities to allow incorporation of more complex fracturing mechanisms (dilatancy, multiple fractures, permeability barriers etc.) as it is illustrated in Figure 11-26 to match observed net pressures in the field and fracture geometry parameterization. Figure 11-26 Fracture propagation simulated p-3D lumped model Various commercial hydraulic fracture design programs are available, some of which are: • FRACPRO, a p-3D fracture model, now marketed by Pinnacle Technologies under name FracproPT. • MFrac, a p-3D hydraulic fracturing simulator, of Meyer and Associates. • FIELDPRO (RES) Lumped 3D model has been using intensively in OMV Petrom for designing fracturing jobs. http://www.petrom.com 11-35 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 11. STIMULATION BY FRACTURING Cell-Based p-3D models Cell-Based p-3D models are based on 2D-models, but fracture height adjustment along fracture is based on local fracture pressure. Fluid flow and proppant transport including settling and convection are modeled by 2D mathematical models. As in the case of lumped models net pressure matching allowed corrections of design model during job execution. Commonly industrial used computer programs are: • STIMPLAN, of NSI Inc, a state of the art 3D hydraulic fracture simulator, now being used in Shell to design fracturing job under name ENERFRAC. • Schlumberger uses a proprietary program, called FracCADE (case shown in Figure 11-27) Figure 11-27 Fracture modeling by FracCADE Cell Based p-3D model 11-36 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 11. STIMULATION BY FRACTURING Figure 11-28 The general workflow of HDF design model selection http://www.petrom.com 11-37 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 11. STIMULATION BY FRACTURING 11.3.4 Net Pressure History Matching and Design Correction In order to use any fracture model for history matching the net pressure to estimate fracture geometry, an accurate pay zone closure pressure is needed. The difference between the ISIP and the closure pressure is net pressure (Figure 11-29). Net pressure over 70 bars (1000 psi) for a minifrac is rare. If the net pressure is considerably higher than 70 bars, the closure pressure selected may actually be the reservoir pressure. Another possibility is that the ISIP is high due to near wellbore problems. When near wellbore problems are encountered the ISIP may increase representing the near wellbore problem and not the true BHTP inside the main body of the fracture. From that reason is important to take account the effect of near wellbore friction and to quantify Fracture Entry Friction (FEF). If quantification of FEF components can be done and if it is considered in conjunction with fracture tip effects (dilatancy), history matching of net- pressure is possible. Based on the results of fracturing jobs performed in OMV Petrom, the common value of the net pressure is around 50 bars. Figure 11-29 Shut-in Pressure Decline and Observed Net Pressure (ONP) Net pressure can be expressed in the following form: 𝑃𝑛𝑒𝑡 = 𝑃𝑏ℎ − 𝐹𝐸𝐹 = 𝑃𝑠𝑡 + 𝑃ℎ − �𝐹𝑚𝑤 + 𝐹𝑚𝑝 + 𝐹𝑚𝑛𝑤 � − 𝑃𝑐𝑙 (11-5) Where: • Pbh - Bottom hole pressure (bar), • FEF - Fracture Entry Friction (bar), • Pst -Surface Treating Pressure (bar), • Ph - Hydrostatic Pressure (bar), • Fmw = Measured Wellbore Friction (includes local loses) (bar), • Fmp = Measured Perforation Friction (bar), • Fmnw = Near-wellbore Friction (bar), and • Pcl = Closure Pressure (bar). Recorded pressure data during minifrac test and RSDT are used to estimate Observed Net Pressure (ONP). In order to obtain a net pressure history match, a 3D fracture propagation simulator is required. Real-time monitoring, recording, and analysis features are a distinct advantage, as the “true” ONP can be calculated while the fracturing treatment is in progress. It enables the engineer on-site to monitor and determine if the treatment is being placed as per design (safely and 11-38 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 11. STIMULATION BY FRACTURING effectively), and, to be able to re-design the treatment in real-time if required and adjust the operating parameters. Older 2D fracture propagation simulators have some limitations: • Underestimate the ONP, thus, a Net-pressure history match is not possible. • Lack real-time monitoring and analysis capabilities, thus, real-time decision making is not possible. Net pressure during job execution should not have abrupt changes and if it is happened it might be indication that wellbore and a nearwellbore friction are not properly determined and has to be corrected, as shows Figure 11-30. If the ONP is calculated with surface pressure data, it is very likely that most of the error is introduced at the wellbore friction component. If actual BH Pressure is used to calculate the ONP, then most all the friction “seen” by the gauge is near wellbore friction. Figure 11-30 Net-pressure plots showing how to correct for friction in real-time There are two typical situations: 1. If the ONP goes up, not enough friction is being subtracted. 2. If the ONP goes down, excess friction is subtracted. To achieve good matching of modeled and measured pressure net-pressures, the friction components should be calculated accurately and adjust using recorded data during job execution. Workflow, shown in Figure 11-31 shows the OMV Petrom best practice methodology for net pressure history matching. Input model parameters should be changed to obtain a match between observed and modeled net pressure. Once this is obtained and a good estimate of fracture geometry is obtained, the treatment may be redesigned for frac treatment optimization and selection optimum geometry of fracture and its uniform propagation. Example in Figure 11-32 shows results of the first multi-stage fracturing job completed in OMV Petrom. It has obtained good matching of designed (modeled) data and recorded data. Nolte-Smith has published the procedure on how to interpret net pressure during injection. Net pressure can be used to estimate fracture geometry during design, on site analysis and for post-frac diagnosis. A graph of log (pn) vs. log (∆t) will produce shapes that can be interpreted. The slopes are characteristic of various types of fracture geometries and modes of propagation. Therefore, the loglog plot, its associated slopes and the pressure derivative provide a diagnostic tool for interpreting the fracturing process. The analyses presume that the pressure measurement represents the actual fracturing behavior, corrected for near-wellbore effects. http://www.petrom.com 11-39 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 11. STIMULATION BY FRACTURING Figure 11-31 Methodology for matching observed and model net pressure Figure 11-32 Matching of observing and modeled fracture net pressure (OMV Petrom well) In Figure 11-33 schematically is shown Nolte-Smith diagnostic plot with characteristic shapes of the curves representing fracture propagation type. If the fracture is confined by barriers, the net pressure increases as predicted by the PKN model, with the range from about 1/8 for low efficiency to about 1⁄4 for high efficiency (Model I). As the fracture pressure increases, it can reach the pressure capacity of the formation. This leads to a regulator 11-40 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 11. STIMULATION BY FRACTURING effect, resulting in nearly constant pressure with zero slopes (Model II) because of accelerated fluid loss primarily near the wellbore. A nearly constant pressure measurement that is equal to the overburden stress indicates a T-shaped fracture. Controlled fracture height growth into a barrier is characterized by a gradually decreasing log-log net pressure slope and a constant pressure derivative. Net pressures steadily decrease if uncontrolled fracture height growth beyond a pinch point occurs. Fissure-dominated fluid-loss behavior regulates the pressure to a constant value when the fissures are mechanically opened. If the fissure permeability increases before the mechanical opening occurs, this response will be preceded by a gradually decreasing log-log slope which is being negative (Model IV). A significant pressure increase (Model III - two active wings and slope 1 and Model III-a – one active wing and slope 2) indicates restricted extension with or a screenout near the fracture tip, whereas a significantly higher slope (1 to 2) should be expected for a restriction nearer the wellbore than the fracture tip. The log-log plot with its characteristic slopes provides a diagnostic tool analogous to the log-log plot for identifying flow regimes within a reservoir. Figure 11-33 Nolte-Smith net pressure interpretation Uniform fracture propagation and geometry simulated by using 3D fracturing model is shown in Figure 11-34 and Figure 11-35 (simulated fracture geometry and conductivity is correlated with stress distribution based on well log interpretation). Figure 11-34 Simulated Fracture propagation http://www.petrom.com 11-41 OMV Petrom Exploration Production RO-EP-DA-PO-06-POL-001-02 OMV Petrom Workover Best Practices Revision 1 2012 11. STIMULATION BY FRACTURING Figure 11-35 Fracture geometry correlated with log. Optimization include an NPV and rate return evaluation for various and the most sensitive fracture geometry parameters (length and width), as shown in Figure 11-36. PROCESS TECHNO-ECONOMICAL OPTIMISATION OF HIDRAULIC FRACTURING DESIGN Nodal Analysis Forecast Production decrease in function of time Reservoir Characteristics Fluid Selection Xf Wf Calculated Fracture geometry Cumulative oil&gas production Present value of income Net income from cumulative oil and gas production decreased for interest rate Net present value Total fracturing fluid volume Fracture geometry (3D or 2D model PKD or KGD) Cost of standard hydraulic fracture operation Optimization of process performing operation Propant Weight Limitations Cost of service provider NPV Propant selection Xf Figure 11-36 Fracture optimization workflow 11-42 http://www.petrom.com RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 OMV Petrom Exploration Production OMV Petrom Workover Best Practices 11. STIMULATION BY FRACTURING 11.3.5 Methodology of Acid Fracturing Acid fracturing, to be applied in inhomogeneous carbonates (over 60% , involves the use of a nonreactive- "conventional"- low or high viscosity preflush to initiate and propagate a fracture, followed by the injection of low-viscous acid, usually HCl. As the acid flows along the fracture, portions of the fracture face are dissolved. Since flowing acid tends to etch the fracture walls in a nonuniform manner, conductive channels are created which usually remain open when the fracture closes. The basic principles and objectives of acid fracturing are the same as for propped hydraulic fracturing treatments in sandstones. In both cases the goal is to produce a conductive fracture with sufficient length, to allow more effective drainage of the reservoir. The major difference is how fracture conductivity is achieved. In propped fracturing treatments, sand or other propping agent is placed in the fracture to prevent closure when pressure is released. Acid fracturing in carbonates relies on nonuniform etching of fracture faces to provide the required conductivities (Figure 11-37). Figure 11-37 Mechanism of Acid Fracturing For homogeneous carbonates, a highly viscous gel preflush is required. This will cause the low viscous acid to displace the high viscous preflush in a finger-type pattern, as it shown in Figure 11-38, thus creating high-conductivity flow channels. To prevent these fingers from merging, special perforation schemes should be applied, e.g. 0.6 m (2 ft) of high-density perforations (4 spf or more) every 1.5 m (5 ft), and a viscosity ratio between the preflush and acid of around 300 should be maintained. This process was patented by Shell in the late seventies as the WISPER process (Widely Spaced Etched Ridges) Figure 11-38 Schematic of Wide Spread Etched Ridges (WISPER) technology of acid fracturing http://www.petrom.com 11-43 OMV Petrom Exploration Production OMV Petrom Workover Best Practices RO-EP-DA-PO-06-POL-001-02 Revision 1 2012 11. STIMULATION BY FRACTURING Propped acid fracturing In very soft carbonates, the walls of the etched channel may be too weak to withstand the closing pressure of the fracture under producing conditions. The channel may lose its conductivity, which will render the stimulation totally ineffective. To prevent this, proppant may be used to keep the channels open. Such a treatment then comprises an acid fracturing treatment, followed by a proppant stage. The advantage of this approach over conventional propped fracturing is that relatively high fracture conductivity can be obtained with relatively low proppant concentrations. However, practical results (offshore Denmark and Norway) show a rapid decline of production after the initial increase in production. With the introduction of more sophisticated fluids and equipment for conventional fracturing, allowing more aggressive designs with higher sand concentrations, the application of propped acid fracturing has virtually been abandoned, being replaced by "conventional" propped hydraulic fracturing in such soft carbonates. Closed fracture acidizing (CFA) The injection of a low viscosity acid at a pressure just below the fracture closure pressure of a previously, or naturally fractured (soft) carbonate formation, is a possible solution for the above described problem of fracture closure. Although the fracture is closed, it still forms a preferential flow path for the acid. This causes a wormhole type penetration of the acid along the original fracture plane, when acid is injected in the closed fracture. Since only a small portion of the overall fracture face will be dissolved into relatively deep channels or grooves, the remaining unetched fracture face can hold these channels open under very severe formation closure conditions, without completely collapsing the etched channels. This is especially beneficial in chalk formations. Selection candidate for acid fracturing There are no set guidelines for choosing between acid fracturing and propped fracturing. Historically, the choice often has been based on individual or collective logic. This results from experience with previous treatment response in the same field or under conditions that might be considered similar. Production response is the best criterion for deciding between the two stimulation methods. Relative cost-effectiveness (value) is also a factor, as it should be. Unfortunately, despite great strides, our industry is not yet able to accurately model or predict the outc
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )