Future Energy and Fusion Power Plants Jan Coenen Jan.Coenen@gauss-fusion.com KIT International School on Fusion Technologies May 7th 2025 © 2025 Gauss Fusion GmbH - confidential Aim of this talk To use the properties of fusion, and expectations of future energy markets, to see how fusion might play a role • The energy challenge • Fusion resource availability • Fusion research • Costs and investment • Conclusions The information is derived from detailed technical work in power plant design studies, and socio-economic studies. Only a summary is given here. © 2025 Gauss Fusion GmbH - confidential The challenge How can the world continue to develop, and poor countries continue to grow, without excessive cost – whether financial, environmental, or other? For all countries to reach this point, world energy use would need to double with today’s population, or increase 4-fold with GOAL? the 11bn expected in 2100. Even if all developed countries came down to this point the factors would be 1.8 today, 2.1 in 2030. © 2025 Gauss Fusion GmbH - confidential Source: https://www.gapminder.org/ Energy use/capita – more recent data hard to obtain! 3 Examples of excessive cost London smog (pollution event) • Thousands can die in a single pollution episode. Source: Wilkins Death 800 SO2Concentration 1 0.8 600 0.6 400 0.4 200 0.2 0 0 1 3 5 7 9 SO2-Concentration [ppm] but overcome by regulation 1000 Number of deaths • Cost associated with industrialisation 11 13 15 17 December 1952 © 2025 Gauss Fusion GmbH - confidential 4 Example of excessive cost • Developing country biomass use generates indoor particulates. • Up to 2.5 million premature deaths each year, mostly women and children. • Cost associated with insufficient or inappropriate development. Source: WHO. Picture: Practical Action © 2025 Gauss Fusion GmbH - confidential 5 Costs of climate change Costs to communities and economies from changes in weather patterns, externalised from energy generation costs. Erftstadt, Germany, 2021 Photograph: Rhein-Erft-Kreis Handout/EPA © 2025 Gauss Fusion GmbH - confidential 6 Many good reasons to pursue clean energy! • Climate change • Particulate emissions and other pollution • Health • Quality of life • Costs of „dirty air and water“ • Growing demand for energy… © 2025 Gauss Fusion GmbH - confidential 7 Growth in energy use is enormous Two characteristic regions of the world, near saturated energy demand and dramatically growing energy demand. Recently just the growth in Chinese consumption has equally total German consumption. Source: EIA, https://www.eia.gov/ © 2025 Gauss Fusion GmbH - confidential 8 Energy consumption • More than 80% of global energy use is supplied by fossil fuels. In business as usual scenarios, most world energy will still be supplied by coal by 2100. Source: BP © 2025 Gauss Fusion GmbH - confidential 9 Increasing energy demand, reducing emissions • World energy growth predicted to continue but CO2 should plateau and decline to keep atmospheric content below e.g. 550 ppm. Decoupling energy and CO2 will require dramatic changes in energy systems. Source: IPCC • Outline solutions are available! Combination of renewables, energy storage, and baseload, but elements of all of these require development and deployment – and acceptance by society. © 2025 Gauss Fusion GmbH - confidential 10 The shape of future energy markets • Using real seasonal data, investigating amount of energy Source: Romanelli 2016 storage required for different levels of baseload power and total solar generation. fpv = 60% • Few TWh storage can make a big difference, but Pbase,crit increases for increasing fpv. • Available pumped storage in Italy ~0.25 TWh • Significant investment in grid infrastructure required if fintermittent is high. • Often correlation across large scales for European weather systems for wind and solar. • Role for 20%+ supply from low-carbon baseload in mixed grid © 2025 Gauss Fusion GmbH - confidential Source: VGB Powertech 2019 11 Large volatility in energy markets EU ETS carbon price €/tonne CO2 Factor of 3 in six months World oil price Factor of 10 in 10 years Target for a future energy price is very uncertain © 2025 Gauss Fusion GmbH - confidential 12 The role of fusion in a future energy system • Fusion is a baseload technology • Reliable, steady generation • Can “trickle charge” storage • Capital intensive, CoE is stable once built • Relatively small amounts of baseload can dramatically reduce storage and installed capacity requirements in a mostly-intermittent renewable system • Lowers overall system cost even if LCoE or spot price is higher than renewables • Safer/cleaner than fission, the main low-carbon rival for this role • Fusion emerges in models with carbon constraints, if it is cost competitive See Integration of fusion power in future decarbonized power systems, Chiara Bustreo © 2025 Gauss Fusion GmbH - confidential 13 Market characteristics of fusion Fusion resources: main fuels are deuterium and lithium © 2025 Gauss Fusion GmbH - confidential 14 How much fuel is available? • Deuterium 1/6700 atoms of hydrogen. • 1 litre of water contains 0.033 g of deuterium. • Energy equivalent of 10 GJ or 280 litres of oil. • Enough deuterium for billions of years of energy supply. • Tritium, bred from lithium. • Lithium in 3 laptop batteries enough for lifetime personal energy needs (~240,000 kWh). • Land-based lithium reserves sufficient for thousands of years. • Fuel reserves are enormous and not an issue. © 2025 Gauss Fusion GmbH - confidential 15 Ultimate fuel resource for different energy systems Large resource in coal, fission breeder, and fusion. Solar provides a large resource as well. Although fusion fuels appear essentially unlimited, we should take care not to be too dependent on other scarce resources. Examples often quoted are tantalum (an alloying element in low activation steels), beryllium, and helium (mostly obtained from gas wells). On the other hand, materials procurement is a small fraction of the cost of fusion electricity so large increases in the price of raw materials could be tolerated. © 2025 Gauss Fusion GmbH - confidential Source: WEC, BP, USGS, WNA 16 Other materials Development in e.g. China has also seen large price rises in steel, concrete, etc. All electricity generation costs inflated. Nominal construction cost indices. IHS-CERA PCCI tracks coal, natural gas, nuclear, and wind power plants from 2000-2014. HWI tracks steam-generating electric technologies, including coal, natural gas, and nuclear power plants from 1980-2014. HWI trend extends back to 1970. U.S. GDP deflator from U.S. Bureau of Economic Analysis, 1980-2000. Source: Muratori et al, Renewable and Sustainable Energy Reviews, 77 (2017) © 2025 Gauss Fusion GmbH - confidential 17 Projected costs of fusion Large uncertainty inherent in projections. Include projected fuel price increase but no carbon tax. Wind is near-term technology but no standby or storage costs. Source: “Projected costs of generating electricity”, IEA, 1998 update, PPCS Fusion has to outcompete fission, economics of a plant (high capital cost, low operational costs) are similar. Seems unlikely to hope that fusion can be much cheaper, especially in the near term. © 2025 Gauss Fusion GmbH - confidential 18 Technological learning reduces costs Source: Solarbuzz https://www.nrel.gov/news/program/2021/documenting-a-decade-of-costdeclines-for-pv-systems.html Expect this in fusion too, but to what extent? Depends on modularisation, standardisation, rate of build, and regulatory environment https://www.construction-physics.com/p/why-are-nuclear-power-construction © 2025 Gauss Fusion GmbH - confidential 19 Costs and investment Costs reduce through R&D and scale GW-scale devices projected to be in few $/W range Power which would be produced if non-DT devices were to use DT Source: Ward © 2025 Gauss Fusion GmbH - confidential 20 Fusion power plants © 2025 Gauss Fusion GmbH - confidential 21 What is fusion? • Fusion is the process that produces energy in the core of the Sun and other stars • Temperature in the core of the sun is ~15 million ºC, pressure is 300 billion atmospheres. • Hydrogen fuses to give deuterium, then helium (and energy). First step is very, very slow. • Power density in core is ~300 Wm-3 (similar to a large compost heap). Would need 107 m3 for a reasonable power station! © 2025 Gauss Fusion GmbH - confidential 22 D-T fusion Fortunately other fusion reactions are much faster. 3 2 4 1 1π· +1 π →2 π»π(3.5MeV) +0 π(14.1MeV) © 2025 Gauss Fusion GmbH - confidential p-p 10-45 In temperature range 10<T<20 keV, reactivity ~T2 Care is needed at higher temperatures! 23 How are high temperatures achieved? House JET Heating power (W) 10,000 10,000,000 Insulation Glass fibre wool Magnetic field Thickness (m) 0.1 1.0 Thermal conductivity (W m-1 K-1) 0.040 0.001 Temperature (K) 300 100,000,000 © 2025 Gauss Fusion GmbH - confidential 24 Plasma pressure • To achieve sufficient power density the plasma density must be “large”. • A typical target value is 1020 m-3 (electron density) which is approximately 105 times lower than atmospheric particle density. • However the temperature is ~106 times higher than ambient, so the required pressure is only a few atmospheres. • This is not a “high pressure” system. (Although many engineering systems see high pressures.) © 2025 Gauss Fusion GmbH - confidential 25 Fusion power gain Q = fusion power / input power Pfus = n2/4 × reactivity × volume × Efus In temperature range 10<T<20 keV, reactivity ~ 4 ×107 T2 (T in J) © 2025 Gauss Fusion GmbH - confidential 26 Fusion power gain Power to maintain plasma temperature = 3πππ/ππΈ (τE is the energy confinement time = E/P) π2 π 2 ππΈ ππππΈ π= = ππ105 105 the fusion triple product. If pressure is expressed in atmospheres Q = nTτE ! Ignition – where alpha power (=Pfus/5) is sufficient to sustain temperature requires ππππΈ ≈ 5 atmosphere seconds This is only approximate. Now that we are close it is not accurate enough to use over-simplified arguments. © 2025 Gauss Fusion GmbH - confidential 27 Minimum Q for a power plant Steady-state tokamak operation requires high current drive power! Efficiency product multiplies heating and current drive (HCD) wall plug efficiency and plant electrical conversion efficiency, e.g. wall plug efficiency 50% with 40% thermal conversion efficiency gives product of 0.2. Q must be above 12 in that case. Emult is the energy multiplication due to nuclear reactions in the blanket. © 2025 Gauss Fusion GmbH - confidential 28 Plasma requirements for high energy gain • High temperature to obtain high fusion cross-section (T>10 keV, routine in JET and similar devices) Resistive coil limit • High density to produce high power: n>1020 m-3. → pressure in range of a few atmospheres • Good thermal insulation so that the plasma temperature can be sustained without high input powers. Otherwise no net energy gain. • These values achieved in current machines, just not usually simultaneously and not for long times Fig. 6(B): The fusion triple product, nTο΄E, in atm s versus the duration of the high-performance phase [s] for fully (or quasi-) non-inductive regimes only X. Litaudon et al 2024 Nucl. Fusion 64 015001 © 2025 Gauss Fusion GmbH - confidential 29 Major progress over decades Huge strides in physics, engineering, and technology. JET: 16 MW of fusion power ~ equal to input power. 21 MJ of fusion energy in one pulse. Currently building ITER – next generation, GW scale tokamak. Scaling laws that fit data from existing tokamaks give confidence that ITER/power plants will achieve desired performance. © 2025 Gauss Fusion GmbH - confidential 30 JET Formerly • Currently the world’s best magnetic fusion research facility. Only operating facility capable of D-T fusion (DTE2 achieved new records in 2021 and 2022). Resistive (copper) TF coils limit pulse length. © 2025 Gauss Fusion GmbH - confidential 31 ITER Aim is to demonstrate integrated physics and engineering on the scale of a power station (500 MW fusion power, superconducting magnets, test blanket modules). Europe, Japan, Russia, USA, China, South Korea, India (>3 Bn people) Construction in Cadarache, France Key ITER technologies fabricated and tested by industry. © 2025 Gauss Fusion GmbH - confidential 32 JET and ITER versus power plants R0 = 3 m R0 = 6 m JET (now) EU 16 MW Q≈1 © 2025 Gauss Fusion GmbH - confidential ITER (~2027-2035) EU, Japan, USA, Russia, China, S. Korea, India 500 MW Pfus ≈ Pelec, in Power plant (2040 onwards?) 2-3000 MW Pelec,net >> 0 R0 = 9 m 33 Tokamak vs Stellarator Transformer coil Modular field coil Poloidal field coil Toroidal field coil "Twisted" plasma shape Toroidal magnetic field lines External Coils and current induced in plasma produce magnetic fields Overview TRL Type of coils Operation Plasma High Simple coils Limited discharge time Instabilities due to plasma current Complex twisted coils produce fields Medium Complex coils Continuous operation Stable plasma Technical Study Non-technical Study Favorable Mixed Construction complexity Construction cost HighPerformance Operation Long Pulse operation Levelized cost of Energy Remote maintenance Competition Collaboration & workforce Public support IP Generation Unfavorable Stellarator Tokamak © 2025 Gauss Fusion GmbH - confidential 34 Characteristics of a fusion power plant • What follows uses tokamak studies as the basis for analysis. • Many of the technology issues would be similar for a stellarator. • There is significant overlap also with technology for inertial fusion – although there are significant differences too, of course. © 2025 Gauss Fusion GmbH - confidential 35 Key components Coils Blanket Divertor Ports for maintenance, diagnostics, heating, etc. Outside the vessel is the ordinary world, inside is the fusion world with specific materials and structures © 2025 Gauss Fusion GmbH - confidential 36 TECHNOLOGY ASPECTS Tritium Breeding Blanket is a key component to run an FPP ensuring fuel self-sufficiency Technology concept • Self-sufficiency in tritium production is critical for fusion power plants due to its scarcity in nature and essential role in the fusion reaction • Breeding blanket, a technology involving lithium materials that produce tritium when hit by neutrons, is a solution to one of the most significant challenges in the fusion industry - the short supply of fuel Technology readiness level • At its current technology readiness level of c.3, TBB must significantly advance to reach level 6 or 7 before a fusion power plant can be constructed • With sufficient R&D, it will take around 10 years to ensure this technology works TBB has currently a low TRL Current machines ITER FPP Gauss Fusion approach Protect magnets & vacuum vessel from neutron and gamma radiation • Gauss Fusion introduces an industrial perspective to the development of the TBB & fuel cycle, accelerating its advancement to an operationsready level Produce the tritium necessary for continued fusion reactions Convert neutron energy into heat and evacuate it to generate a cycle capable of supplying electricity • The company can significantly contribute to the development process by leveraging connections with industrial companies for extensive, integrated testing of this technology Gauss Fusion aims to significantly enhance the TBB & fuel cycle development's efficiency and value by incorporating an industrial viewpoint right from the initial stages © 2025 Gauss Fusion GmbH - confidential Source: CEA, KIT, ITER, IAEA 37 TRITIUM FUEL CYCLE AND BREEDER BLANKET Potential Choice : Helium Cooled Pebble Bed – for early deployment Technology rationale & gaps • Lifetime 3-5 years with high availability • Direct path to production unit • RAFM steel as structural Material • Helium as purge gas and coolant (80bar) • Tungsten as amour material • Li ceramic pebbles (60% enriched) • Beryllium multiplier Known gaps • TBR > 1.1 • Design of components / Materials data • Blanket will be ILW (Type B) • Coolant loop design • BB incorporates shielding • Breeder material availability • Temperature 400 C to 550 C • Testing capabilities do not yet exist Hernández, F.A., et al. Journal of Nuclear Engineering 4, 565–601. https://doi.org/10.3390/jne4030037 © 2025 Gauss Fusion GmbH - confidential 38 TRITIUM FUEL CYCLE AND BREEDER BLANKET Design challenges en route to deployment Stellarator shape • Modular breeding blanket to cover various shapes • Shielding to be adapted to meet lifetime requirements on VV / coils • Consideration towards maintenance to be incorporated Materials for TBB • Breeding blanket materials will evolve during staged approach • Testing of blanket modules to be performed in parallel to engineering design • Neutron source required for both materials / functional tests © 2025 Gauss Fusion GmbH - confidential 39 Plasma exhaust The trough in the base of the tokamak is called the divertor. It is the exhaust system where power and particles are extracted. Probably the most challenging part of ITER. Power levels of 10-20 MW m-2 will fall here. ELMs can provide power pulses. Interactions with the wall can generate UFOs like shooting stars as small particles of dust fall into the plasma. © 2025 Gauss Fusion GmbH - confidential In a QI stellarator, magnetic islands are created at the plasma edge, and the divertor „cuts“ this island W7-X 40 FUEL CYCLE Plasma exhaust must be recirculated Architecture Development – Work in Progress D H He4 He3 H2O HTO Ne TI m p Imp He4 He4 H H D D T T T Imp Imp TI m p TI m p Ne Ne HTO HTO H2O H2O He3 MONITOR He3 D H He4 He3 H2O HTO Ne Imp TI m p T D H He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne TI m p Imp He4 He4 H H D D T T T He3 Imp Imp TI m p TI m p Ne Ne HTO HTO H2O H2O He3 MONITOR T T D H He4 He3 H2O HTO Ne TI m p D H He4 He3 H2O HTO Ne D H He4 He3 H2O HTO Ne TI m p Imp Imp TI m p Imp He4 He4 H H D D T T T H2O HTO Ne TI m p T Imp D H He4 He3 H2O HTO Ne H He4 He3 H2O HTO Ne TI m p He3 H2O H2O H2O HTO HTO HTO Ne Ne Ne TI m p H He4 He3 H2O HTO Ne Imp TI m p T H Heating, Ventilation, and Air Conditioning He4 Ne Imp H He4 He3 H2O HTO Ne TI m p T Imp D H He4 He3 H2O HTO Ne D H He4 He3 H2O HTO Ne Imp TI m p T D H He4 He3 H2O HTO Ne Imp TI m p Imp D D T T TI m p Ne D H He4 He3 H He4 Imp Imp TI m p Ne Imp TI m p Ne HTO TI m p Ne HTO H2O Ne HTO H2O He3 HTO H2O He3 He4 H2O He3 He4 H He3 H2O Emergency Air Detritiation System H Imp T D He4 Imp TI m p D TI m p START UP T H HTO H2O HTO Ne TI m p D Imp T T Ne Imp TI m p E-ADS Imp Imp He3 MONITOR Imp Imp Imp HTO Ne TI m p TI m p TI m p H2O HTO Ne HTO Ne He3 H2O TI m p D H2O HTO He4 He3 Imp T He3 H2O H He4 T He4 He3 D H D HVAC (TFC) H D He3 Storage & Export T D T T D H He4 He3 He3 T He4 D H H D He4 T TI m p D T He4 TI m p D Imp HSE H Ne TI m p HTO Ne H2O HTO D Imp He3 H2O He4 He3 H He4 D H T T D Imp T D Imp TI m p T T TI m p He3 HTO Ne Imp Imp TI m p TI m p Ne He3 Imp HTO He4 TI m p H2O H Ne He3 D H2O He4 He4 HTO HTO H H H2O H2O D D He3 He3 MONITOR T T MONITOR T T He3 H He4 He3 He4 HTO HTO H2O H2O H PTS Ne Imp Imp TI m p TI m p Ne Pure Tritium Storage D H He4 He3 H2O HTO Ne He4 He3 H2O HTO Ne TI m p T D H He4 He3 H2O HTO T D H He4 He3 H2O HTO Ne Imp TI m p T D H He4 He3 H2O HTO Ne TI m p Imp He4 He3 H2O HTO Ne TI m p Imp T D H He4 T D H He4 Imp T T HTO HTO H2O H2O He3 He3 He4 He4 H H D D T HTO Ne TI m p H He4 He3 H2O HTO Ne TI m p T T D D H TI m p H2O HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O T D H He4 He3 H2O HTO Ne Imp TI m p T D H He4 He3 H2O HTO Ne H2O HTO Ne TI m p Imp He3 H2O HTO Ne Imp TI m p TI m p He3 H2O HTO Ne Imp TI m p T D H He4 He3 H2O HTO Ne Imp TI m p T D H He4 He4 MONITOR TI m p Imp He3 Imp He4 TI m p H Ne Ne D HTO HTO H2O T He3 H H2O D He3 HTO HTO H2O H2O He3 Ne TI m p Imp T D H He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne TI m p T D H He4 He3 H2O HTO Ne Imp TI m p Imp Imp T TI m p D T H He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne TI m p He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O Ne TI m p Imp HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne Imp TI m p T D H He4 He3 H2O HTO Ne TI m p Imp HTO Ne TI m p Imp He4 He4 He4 He3 He3 H2O H2O HTO HTO Ne Ne TI m p T T D H H TI m p Imp T He3 D Imp D He4 He3 H2O HTO Ne TI m p TI m p TI m p TI m p Ne Ne Ne HTO HTO HTO H2O H2O H2O Imp Imp He3 He3 He3 TI m p TI m p He4 He4 He4 Ne H H H ISS Isotope Separation System H HTO D D H2O T T D GDI T D H He4 He3 H2O HTO Ne TI m p He3 H2O Imp WDS T He4 Water Detritiation System D D H H He4 He4 He3 He3 Waste Buildings H2O H2O HTO HTO Ne Ne TI m p TI m p Imp Imp Imp Imp TI m p H TI m p TI m p Ne D Ne Ne HTO T HTO HTO H2O Imp H2O H2O He3 TI m p He3 He3 He4 Ne He4 He4 H HTO H H D H2O D D T He3 T T Gas Distribution Injection T Imp Imp Imp Imp Imp Ne HTO Imp H D T HTO TI m p Imp TI m p D He4 He4 He4 H2O Ne Ne H H H H Ne HTO HTO He4 D D T D HTO H2O He3 T T PVT Pressure Volume Temperature T He3 H2O He3 Imp Ne TI m p Imp Imp Imp TI m p TI m p Ne Ne H2O He4 Imp TI m p ESS Emergency & Shutdown Storage Imp Ne TI m p H TI m p Ne D Imp HTO HTO Ne TI m p Imp H2O HTO He3 H2O He4 He3 H He4 D H T HTO Imp TI m p H2O Ne He3 HTO He4 H2O D H Imp He3 T T He3 D TI m p He4 Imp TI m p T Ne H T HTO He4 He3 T Imp He3 He4 He4 HTO H2O He3 Imp TI m p Ne RESTART VALIDATION H H He4 D H2O He3 D Ne Imp He3 He4 H He4 Ne He3 TI m p H2O Ne HTO HTO Imp H He4 D H H Imp H2O Ne D H T D D TI m p He3 D T D HTO HTO Ne TI m p T Imp He4 T H START UP T H2O H2O H He4 He3 H2O HTO T D H He4 He3 H2O HTO Ne TI m p Imp D Stellarator Building / Zone T He3 Imp Imp T T HVAC (STEL) He4 TI m p Imp HPS He 3 Purification System T Heating, Ventilation, and Air Conditioning H Heating, Ventilation, and Air Conditioning Ne TI m p TI m p TI m p HTO Ne Imp Imp Ne Ne H2O HTO TI m p TI m p HTO HTO Tritium Purification System Ne Ne H2O H2O H2O HTO HTO H2O H2O He3 He3 He3 He3 He3 He4 He4 He4 He4 He4 H H He3 H H H D D D HVAC (WASTE) He4 D D D T • Plasma exhaust includes D, T, H, He, Ne, W… T T Slight Tritium into Atmosphere via Chimney that is Kick-ass Imp TPS D D Imp H H2O He4 He3 He3 He4 H2O H HTO D Ne T TI m p Imp TI m p Imp Ne T HTO He4 H2O H He3 D He4 T H T Imp D Imp TI m p TIE H TI m p D T H T D Ne STACK Ne T T T Tritium Import Export Imp D H He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne Imp TI m p T D H He4 He3 H2O T T D H He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne TI m p Imp D D T T Imp Imp TI m p TI m p Ne Ne HTO HTO H2O H2O He3 He3 He4 He4 H H D D T T D He4 H HTO HTO H2O H H He3 D He4 He4 He4 He3 H T GDP H2O He4 He3 H2O HTO Ne TI m p Imp Gas Distribution Pellets T D H He4 He3 H2O HTO Ne TI m p Imp He3 H He4 He3 H2O HTO Ne H He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne TI m p Imp H2O TI m p Imp He4 He3 H2O HTO Ne TI m p Imp H T HTO He3 T D H He4 He3 H2O HTO Ne TI m p D H He4 He3 H2O HTO Ne TI m p Imp Imp HTO H2O He4 IRPR Imp GPS H Imp H Isotope Rebalencing and Protium Removal TI m p D TI m p D He4 D Imp TI m p He3 D T Ne T He3 He4 H T T Ne HTO Pellet Injection System T D H He4 He3 H2O HTO Ne TI m p Imp T TI m p TI m p Ne Gas Puffing System T Imp D H H2O H Imp He3 H2O HTO Ne Ne TI m p Imp Imp TI m p TI m p Ne He4 Imp HTO H TI m p H2O D Ne He3 T HTO He4 SPLITTER HTO Imp T D H He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne TI m p Imp Imp TI m p D H He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 HTO Ne TI m p Imp H2O HTO Ne TI m p Imp D D T He3 T T D D He3 H HTO HTO H2O H2O He4 He4 H PS-C H Pumping System - Cryostat He4 Ne He3 TI m p TI m p Ne H2O T T H TI m p He4 Ne He3 HTO He4 H2O He3 He3 H2O He4 HTO H Ne D He3 MONITOR He3 D T H2O T T He4 He4 H H Imp Imp D D TI m p HTO Ne TI m p HTO Imp H2O T He3 D He4 H H He4 D He3 T H2O Imp TI m p Ne Ne HTO HTO H2O D Imp H2O HTO H2O He3 H2O He3 He4 He3 He4 H He4 PIS H D H D Imp T Ne TI m p TI m p D D T T Ne Ne T T HTO HTO Imp Imp H2O H2O TI m p TI m p Ne H He3 D Ne T Ne • Must be “cleaned up” and re-injected as efficiently as possible T TES Tritium Extraction System Imp H2O H2O Imp HTO HTO Ne Ne TI m p TI m p D H He4 He3 H2O HTO Ne Imp Imp T Imp TI m p D H He4 He3 H2O HTO Ne Imp TI m p D H HTO H2O He3 He4 ADS Imp TI m p Ne Air Detritiation System T Imp Imp D D D H He4 He3 H2O HTO Ne Imp TI m p He3 He3 T T D H He4 He3 H2O HTO Ne Imp TI m p D D Ne T HTO HTO D D H2O H2O T T He3 He3 He4 He4 Imp Imp H H TI m p TI m p Ne Pumping System - Walls T HTO HTO H2O H2O He4 He4 H PS-W H Rear Surfaces TI m p TI m p T TBB Plasma Ne Ne Service Vacuum System T Imp TI m p D Ne H HTO He4 H2O He3 He3 H2O He4 Ne H TI m p D Imp Imp TI m p HTO Ne HTO HTO H2O H2O H2O He3 He3 He3 He4 He4 He4 H SVS H H D D D T T T T HTO T T Ne Imp TI m p TI m p H2O HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne TI m p Imp Ne TI m p Ne NST H EES He4 He3 He3 HTO HTO Neon Storage Tanks Ne TI m p Imp T D H He4 He3 Imp Imp D H He4 He3 T Imp T D H He4 He3 H2O HTO Ne TI m p HTO Ne Imp TI m p D H He4 He3 H2O HTO Ne Imp Imp TI m p D H He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne TI m p Imp Imp T D TI m p Ne HTO H2O He3 He4 H MFP Metal Foil Pump Imp T D H He4 He3 H2O HTO Ne TI m p He4 He3 H2O HTO Ne TI m p Imp TI m p Imp Imp T D H T D H He4 He3 H2O D H He4 He3 H2O HTO Ne TI m p Imp Ne Imp TI m p TI m p Imp Ne Imp HTO TI m p H2O Ne He3 HTO SPLITTER He4 H2O Imp Imp He3 TI m p TI m p VAC PUMP He4 Fuel Cycle Reactor Interface H H Ne Ne D D HTO HTO T T H2O H2O Ne He3 He3 HTO He4 He4 H2O FCRI H H He3 D Imp Imp TI m p TI m p Ne Ne D He4 HTO HTO T H H2O WDC Water Divertor Cooling Imp D He3 T He4 T H T TI m p T Ne D HTO H H2O He4 He3 He3 He4 H2O H HTO D D H2O TI m p HTO TI m p T He3 Ne Ne Ne H2O TI m p Imp He4 HTO He3 Imp TI m p HTO He4 Ne Water Detritiation Concentrator Ne H H2O H H2O HTO H2O D He3 D HTO H2O He3 T He4 HTO T Imp He3 He4 H2O TI m p TI m p Imp He4 T T H He3 TI m p Ne Ne Emergency & Shutdown Storage TI m p WDC H H T D He4 HTO H2O H2O Ne D D WVS T H T Imp HTO T T Water Vessel Shielding D D HTO H H2O He4 He3 He3 He4 H2O H Ne D Imp T Imp T Ne He3 D T Imp TI m p HTO He4 He4 Ne H2O H H HTO He3 D D H2O He4 T T TI m p TI m p Imp Ne Imp TI m p HTO Local Extraction Ventilation Ne H2O H2O He3 HTO HTO He3 He3 He4 Imp H2O He4 He4 H H H H D D D T • Minimise (and account) T inventory T D TI m p He3 Divertors T Ne He4 T Ne HTO TI m p H2O Imp He3 He4 He4 He3 H H2O D H LEV H T First Wall Imp TI m p T D H He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne TI m p Imp D H He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne TI m p Imp HTO Ne TI m p Imp T T Imp Imp TI m p TI m p Ne Ne HTO HTO H2O H2O He3 He3 He4 He4 H H D D T IES T Imp Imp TI m p TI m p Ne Ne HTO HTO H2O H2O He3 He3 He4 He4 H H D D T Impurity Extraction System T H He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O H He4 Ne TI m p H2O HTO Ne TI m p Imp Imp D D HTO H HVAC (HOTCELL) He4 T He3 T HTO HTO D H2O D H Imp Imp H2O HTO Ne TI m p T Imp D He3 D H He4 He3 H2O HTO Ne TI m p H Imp Imp He4 He3 H2O HTO Ne Imp TI m p D T D He4 H SDS TI m p Imp Imp Ne Solid Detritiation System Imp D H He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne TI m p D H He4 He3 H2O HTO Ne Imp TI m p T D T D H He4 He3 H2O HTO Ne TI m p H He4 He3 H2O HTO Ne TI m p Imp Imp T T D D H H Imp He4 He4 He3 He3 HTO Ne TI m p He4 Imp H TI m p D Ne T HTO Imp H2O H2O PRS He3 Imp HTO HTO H2O TI m p H T D H He4 He3 H2O HTO Ne TI m p Imp T D H T Imp TI m p HTO He4 Ne H2O He3 HTO He3 H2O H2O He4 HTO He3 H Ne He4 D TI m p H TI m p TI m p T Imp D H-ADS Hot-Cell Air Detritiation System Ne Ne He3 TI m p HTO HTO H2O Ne H2O H2O HTO HTO He3 He3 Ne H2O He4 Imp He4 TI m p He3 H TI m p H Imp He4 D Ne D T H T HTO Imp T D D GDS-SCS Gas Detritiation System for Secondary Containment Systems H T H2O TI m p Imp He4 Imp He3 Ne TI m p He3 TI m p HTO Ne H2O Ne He4 H2O HTO T HTO H He3 H2O D H2O D He4 He3 H He3 T H He4 He4 He4 D H He3 H SCS D H2O D Secondary Containment Systems HTO TI m p Ne Ne TI m p HTO Imp H2O T Ne Ne Pebble Reprocessing System T T D D He4 H He4 He3 H2O HTO Ne TI m p Imp D H He4 He3 HTO Ne Imp TI m p HTO Ne Imp HTO Ne TI m p Imp T HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne TI m p Imp H He4 TI m p Imp Imp TI m p He3 H2O HTO Ne TI m p Imp He4 He3 H2O HTO Ne TI m p Imp Ne TI m p D H He4 He3 H2O HTO Ne TI m p Imp Imp D H He4 He3 H2O HTO Ne TI m p D H He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne TI m p D H He4 He3 H2O HTO Ne TI m p He4 He3 H2O HTO Ne TI m p He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O HTO T D H He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne TI m p Imp He4 H D T H H2O HTO Ne TI m p D He4 He3 H2O HTO TI m p H D Imp Imp D Ne Imp He3 T H SCPS TI m p H2O HTO Ne TI m p Imp GDS-APB Gas Detritiation System for Active Permeation Barrier Imp T D H He4 He3 H2O HTO Ne TI m p Imp HTO T H2O Imp Mechanical Power Plant Buildings Hot Cells & Reprocessing Building / Zone D D T T He4 H He3 HCS Hot-Cell Containment Systems He3 H He4 He3 He4 HTO HTO H2O H2O H PGS Imp Imp TI m p TI m p Ne Power Generation System Ne Ne Ne HTO HTO H2O H D He4 Ne T D H He4 He3 H2O HTO Ne TI m p Imp T D H He4 He3 H2O HTO Ne TI m p Imp T He3 He3 He4 H2O H D T H Secondary Coolant Purification System T D D T D Imp T SHTS Secondary Heat Transfer System T TI m p Imp Ne TI m p HTO Ne Imp Imp HTO TI m p TI m p H2O Ne Ne He3 HTO HTO He4 H2O H2O H He3 He3 D He4 He4 T T H H Imp D D TI m p T T Ne H2O Imp HTO He3 TI m p H2O He4 Ne He3 H HTO He4 D H2O H APB Active Permeation Barrier T He3 D Imp Imp He4 T TI m p TI m p H SHL Secondary Heat Loop Ne Ne Imp HTO HTO TI m p H2O H2O Ne He3 He3 HTO He4 He4 H2O H H He3 D D D He4 T T T H Imp T D H He4 He3 TI m p Imp H2O T D Imp He3 T T TI m p He4 PHTS Primary Heat Transfer System Ne H Imp Imp D TI m p TI m p T GDS-HCS Gas Detritiation System for Hot-Cell Containment Systems HTO Ne Imp H2O HTO Ne H2O HTO TI m p H2O He3 He3 H2O Ne He3 He4 He4 He3 HTO He4 H H He4 Imp H2O H D D H TI m p He3 D T T D Ne He4 H2O Imp T HTO H Imp H2O D He3 H2O He3 T He4 He3 D HTO He4 T Ne H HVAC (HTS) H H T Heating, Ventilation, and Air Conditioning D H2O T TI m p T D H He4 He3 H2O HTO Ne TI m p Imp Imp Imp TI m p TI m p Zeolite Regeneration System Ne Ne Primary Coolant Purification System Imp Imp T TI m p TI m p Ne TI m p HTO Ne HTO HTO H2O H2O H2O He3 He3 He3 ZRS He4 He4 He4 H H H D D D T T T Imp Imp Ne Imp HTO TI m p Imp TI m p H2O Ne TI m p Ne He3 HTO He4 HTO He3 T He4 H2O HTO H2O He4 T PCPS He3 He3 He4 H T H He4 H2O H D T D H D T RHS Remote Handling System T T D T He3 T Imp TI m p TI m p Ne FCRI Regeneration System Ne HTO HTO H2O He4 Imp He3 TI m p He3 H TI m p He4 Ne He4 D Heating, Ventilation, and Air Conditioning H2O H T H H2O He4 He3 He3 He4 H2O H FRS T T © 2025 Gauss Fusion GmbH - confidential He3 T D T D Ne • Complex, continuous process (ITER and JET are batch-oriented) D T T D H He4 He3 H2O HTO Ne TI m p Imp 41 Superconducting magnets • Reactor performance limited by magnet technology (critical field, critical current, conductor heating). • Superconductors also limited by manufacturing and brittleness – need support structures. 20 m • Must be shielded from radiation. • Can be extremely large (manufacturing issues) 12 m © 2025 Gauss Fusion GmbH - confidential 42 Stellarator coils • „Modular“ coils (i.e. combined TF and PF) need to supply plasma rotational transform • Results in complex, hard to manufacture (and support) shapes • Must allow enough space for blanket/shielding between plasma, VV, and coils • Engineering effort required to simplify design and assembly © 2025 Gauss Fusion GmbH - confidential 43 Remote maintenance All in-vessel systems will be contaminated by tritium and radionuclides from neutron irradiation. Maintenance must be carried out robotically, and removed components stored in hot cells until recyclable. Efficient operations to minimise downtime are vital to the economics of the power plant. EU-DEMO remote maintenance concept © 2025 Gauss Fusion GmbH - confidential Stellarator port/blanket segmentation concept 44 FUSION MATERIALS RESEARCH ESSENTIAL Establish supply chain and know how Making fusion sustainable 1 EUROFER supply chain & materials data • Supply chain for EUROFER is highly constrained • Start purchasing when choices are made • Allow for alternative steel options (Grade 91) for initial blanket after ALARA assessment Lithium enrichment Beryllium as multiplier material 2 • GIGA would need ~300 t of Beryllium Yearly production is on same level • Explore Pb as alternative 3 • GIGA will need ~50-70 t of Enriched Lithium ~5000 t of Hg for ~10t/y production (ICOMAX) • Mercury production 1200 t per year • Exploration of new methods needed Supply chains & R&D & environmental impact Not just how we put it together, but what we make it out of. Lowest swelling observed in body-centred cubic alloys (V alloys, ferritic steel). A key issue regarding BCC alloys is radiation embrittlement. Also PFMs, HHF materials, tritium permeation barriers, rapid decay of waste… Strong partnerships between industry, supply chain and research institutions are needed © 2025 Gauss Fusion GmbH - confidential 45 EU power plant studies (PPCS, 2000s) Looked at a range of power plants Model A: water-cooled steel Model B: Helium-cooled steel Model C: Steel and SiC composite with He and LiPb coolant Model D: SiC composite with LiPb coolant Each developed in sufficient detail that overall properties of safety, waste, emissions, cost etc. could be determined. © 2025 Gauss Fusion GmbH - confidential A, B, C: ~3000 MW fusion D: ~2000 MW fusion Full tritium cycle 1000 MW electricity Steady-state Maintenance: remote handling optimized for high availability 46 Potential harm from waste materials Radiological hazard from fusion materials decays rapidly, with a half-life of around 10 years. Real hazard depends strongly on achievable impurity levels – this means specific fusion material supply chains must be developed. Source: PPCS Carbon-14 is produced naturally in the atmosphere by cosmic ray bombardment of nitrogen. Nitrogen in a fusion plant undergoes the same effect, but with much larger fluxes To keep C-14 production well below the natural level requires nitrogen concentrations at or below 100 ppm. This is true of some materials and not others, so choices can be important SS-316 OPSTAB RAFM © 2025 Gauss Fusion GmbH - confidential 600 ppm 3,000 ppm <100 ppm 47 Tritium release One of the main hazards in an accident. Maximum possible release from an internal accident are few 10s of grammes. Doses to local population are, in the worst case, too low for evacuation to be considered. An external accident, e.g. enormous earthquake, could potentially release more but the consequences of the event itself would be much more serious than any releases from the plant. Bounding accident analysis, combines the worst outcome in each area. Releases still small and doses to the public low. Compared with approximately 4 mSv average background in EU Source: PPCS, SEAFP © 2025 Gauss Fusion GmbH - confidential Model Dose A 1.2 mSv B 18.1 mSv 48 Fusion costs • Typical costs breakdown by system • Costing studies also typically look at financing and project management costs which can be 1/3 of total plant costs • „Fuel/consumables costs“ (blanket, divertor) small fraction of total • Learning factors applied to fusion-specific components © 2025 Gauss Fusion GmbH - confidential 49 Cost variation with key parameters 1 1 πππ ∝ 0.6 0.4 0.5 0.4 0.3 π΄ ππ ππ‘β π½π π technology physics coe is cost of electricity, A is availability, ηth is conversion efficiency, Pe unit size, βN normalised β, N is normalised density. In one study (2000) we looked at the way that a number of key parameters affect the final cost of electricity. Assumed Nb3Sn coils with conventional assumptions. We could re-do this with a different parameter set, and calculate capital cost instead of cost of electricity. (This has already done in a simplified analytic study.) Caution – interactions become complex e.g. βN and H interact through I, B, n etc. © 2025 Gauss Fusion GmbH - confidential 50 A FUSION POWER PLANT ISN’T JUST THE STELLARATOR GIGA fusion power plant layout Cooling Towers Substation Turbine Building Hot cell Water Treatment Power supplies Plasma heating systems Offices Stellarator Building Cryoplant & Control Tritium plant Site access control © 2025 Gauss Fusion GmbH - confidential 51 SITE SELECTION Space, customers, logistics, regulation, and politics Site selection activities need site requirements: © 2025 Gauss Fusion GmbH - confidential • Logistics and hence max. component size • Regulation will always have local considerations and choice of country fixes authority: early engagement required and need to engage on design as it proceeds, need to document design choices and evaluation • Fusion regulation process cannot be fully specified until there is an FPP design to test it against… • Safety principles and approach established early 52 SITE SELECTION Space, customers, logistics, regulation, and politics Each blue point is an area fulfilling the filter criteria: 1 > 60 ha area 2 Electrical grid 3 Cooling 4 Urban areas “nearby” Present estimate area: 1000 x 1260 m2 = 126 104 m2 = 126 ha with FPP core (1-5): 560x500 = 28 ha Electricity: 700x500 = 35 ha Grid (8): 700x300 = 21 ha General use (14): 700x200 = 14 ha Total: 100 ha © 2025 Gauss Fusion GmbH - confidential 53 Conclusion • Fusion requires a high temperature, around 100 million K. • This is routinely achieved. • To achieve high power gain the density must be sufficiently high and the thermal insulation sufficiently good to reduce the required heating power. • JET is around Q=1, ITER designed at Q=10, DEMO/FPP Q=20-40 • Fusion has a very large, widely distributed, fuel resource, enough for many thousands of years of energy supply. • Fusion power stations should have very good safety and environmental properties. If made to work (with reasonable availability) they have the chance to provide an economic source of energy. © 2025 Gauss Fusion GmbH - confidential 54 Questions? © 2025 Gauss Fusion GmbH - confidential 55 Coffee break © 2025 Gauss Fusion GmbH - confidential 56 Basics of magnetic confinement fusion and fusion technology © 2025 Gauss Fusion GmbH - confidential 57 A JET plasma lasts about 1 minute Limited by heating of (resistive copper) magnets, heating of inertially-cooled components. © 2025 Gauss Fusion GmbH - confidential 58 What is a tokamak? • • Leading current technology for (magnetic) fusion power Derived from the Russian for toroidal magnetic chamber from plasma current 1/ © 2025 Gauss Fusion GmbH - confidential R toroidal field dependence 59 Why different magnetic field components? A simplified description is that: The poloidal field provides insulation (confinement) The toroidal field provides stability The additional vertical field provides equilibrium and shape The additional radial field provides shape and stability © 2025 Gauss Fusion GmbH - confidential Plasma current TF coils PF coils Plasma rotation, profiles, heating 60 STELLARATOR HISTORY Stellarators were one of the first magnetic confinement concepts Inherently steady-state (no current drive, no transients) • Poor thermal particle orbits (neoclassical confinement) • Poor energetic particle orbits (alpha confinement) Better Confinement • 1 π π Banana Plateau PfirschSchlüter Lyman Spitzer, Jr. standing next to the Model A stellarator at Princeton. More Reactor-like © 2025 Gauss Fusion GmbH - confidential 61 THE STELLARATOR COMEBACK Recently advances in theory are making stellarators attractive • Thermal particle confinement optimization (drift optimization) → Quasi-symmetries • Energetic particle confinement optimization • Turbulence optimization Ions Electrons Normalized heat conduction in W7-X and LHD showing neoclassical optimization effect. Beidler, C.D. et al., Nature 596 7871 (2021) 221. © 2025 Gauss Fusion GmbH - confidential 62 STELLARATOR SHAPING Shaping of magnetic flux surfaces defines the device physics n=0 n=1 n=5 -4.02 MA 560 kA 0A Eps_eff = 0.002 Eps_eff = 0.00045 © 2025 Gauss Fusion GmbH - confidential 63 STELLARATOR PHYSICS Optimization of the magnetic field shape is key • The magnetic coils determine the plasma shape • The plasma shape determines the plasma physics (geometric and magnetic field quantities) • Non-linear optimizers are used to design both plasma shapes and magnetic field coils A stable quasi-isodynamic stellarator configuration (SQUID). Goodman, A.G. et al., PRX Energy 3 2 (2024) 023010. © 2025 Gauss Fusion GmbH - confidential Coil centerlines for GIGA device with coilplasma distance. 64 Tokamak equilibrium A current-carrying ring tends to expand under the pressure of its own magnetic field. I In order to counteract the expansion force, an external, vertical, magnetic field must be applied F πΉ = πΌπ΅2ππ F F The plasma pressure, as well as the current, applies an outward force. Additional coils – vertical field coils – are installed for this purpose. F I © 2025 Gauss Fusion GmbH - confidential 65 Stability A fusion plasma has almost no mass (0.01g in JET) but is subject to large forces. Instabilities can accelerate (grow) very fast. Fortunately most gross instabilities involve moving the (locked in) magnetic flux with the plasma and this is opposed by conducting structures so instabilities are slowed down. As the plasma moves, currents are induced in the vessel creating a magnetic field that pushes back on the plasma. One key instability is the vertical instability. Shaping the current ring, elongating it, makes it unstable to vertical displacements. Use coils above and below the plasma to pull on it and cause elongation. Motion towards one coil leads to imbalance and instability. Need fast (millisecond) feedback on RADIAL FIELD to stabilise. © 2025 Gauss Fusion GmbH - confidential 66 Plasma stability There are other possible instabilities, which are specific to plasmas as opposed to rigid current rings, usually associated with plasma waves and resonances around the toroidal loop. An example arises if we put too much current in the plasma loop, in which case the toroidal field is no longer strong enough to suppress gross instabilities. This can lead to a sudden loss of energy and can also couple to a loss of position control. A resulting Vertical Displacement Event (VDE) is not good. The machine is operated so that it can tolerate even the worst possible example. In a VDE, the plasma can contact the vessel, driving further currents – known as halo currents – through the vessel. Instabilities due to pressure gradients in the edge can cause ELMs (edge localised modes) which dump power into the divertor, like a grenade going off © 2025 Gauss Fusion GmbH - confidential 67 Confinement / insulation Magnetic fields cause charged particles to spiral around field lines. Plasma particles are lost to the vessel walls only by relatively slow diffusion across the field lines. Only charged particles (D+, T+, He+…) are confined. Neutrons escape and release energy. A toroidal (ring shaped) device is a closed system intended to avoid end losses. © 2025 Gauss Fusion GmbH - confidential 68 Magnetic insulation 600 Larmor orbits to edge of JET Time to escape by diffusion = collision time ×6002. Collision time approx. 5 ms: confinement time ~6002 ×0.005 = 0.5 hrs. Extremely high value. A power of 10MW in a 100m2 device would give a central temperature of 1011K, instead of 108K required for fusion. Scaling with machine parameters Confinement time ∝ a2B2T1/2/n A larger machine with stronger magnetic field gives better confinement. This level of confinement is not possible, even theoretically in a tokamak. BUT WHY NOT? © 2025 Gauss Fusion GmbH - confidential 69 Neoclassical effects A toroidal device has extra flow of current and even different classes of particle orbits. These give extra losses. The pressure gradient is balanced by j×B force, but B varies substantially across the plasma (1/R!), typically by a factor of 2. This leads to additional currents and thermal losses. Inboard The magnetic field is stronger at smaller major radius, so particles with low toroidal velocity are reflected. The increased orbit size increases transport further. The existence of trapped particles is very important. Outboard Inboard |B| Outboard © 2025 Gauss Fusion GmbH - confidential 70 Trapped particles Step size larger than Larmor orbit by factor of B/Bθ≈10, hence transport approximately 100 times classical. Only low parallel velocities are trapped so only a fraction of particles are trapped; however the scattering between trapped and ‘passing’ occurs quickly. In total, trapped particle transport (‘neoclassical’) ~50 times larger than classical. This difference in trapped and passing particle confinement, and the scattering between them, leads to a net imbalance in passing particle flows: the selfdriven “bootstrap” current. Important for reducing current drive requirements (and hence recirculating and exhaust powers) in future power plants. © 2025 Gauss Fusion GmbH - confidential 71 Turbulent heat loss In a real fluid there will be turbulence, as in water flowing down a pipe. Simple, laminar, calculations of flows are unlikely to be correct and this turns out to be the case in tokamak plasmas. Turbulence may drive convective cells or increase the effective collision frequency. This leads to heat losses of around 10 times higher than those predicted by simple theory. This is often referred to as ‘anomalous transport’. Simulation of turbulence in tokamak plasma (plasma core is not simulated). (Source: Nathan Howard, MIT) © 2025 Gauss Fusion GmbH - confidential 72 H-mode What is an H-mode? At high power levels the thermal insulation improves by forming an edge “barrier” Temperature 35 30 ELMy H-mode The edge gradients can be so strong that periodic relaxation instabilities occur – Edge Localised Modes T (keV) 25 20 L-mode 15 H-mode 10 5 0 0 This is an improvement on earlier performance (“Lmode”), we have also identified “advanced” modes of operation. © 2025 Gauss Fusion GmbH - confidential 0.2 0.4 0.6 0.8 1 ο² 73 ELMs ELMs in MAST. Source: UK Atomic Energy Authority © 2025 Gauss Fusion GmbH - confidential 74 Overall energy confinement Simple classical theory would predict a level of thermal conductivity of 10-6 W m-1 K-1, 40,000 times lower than the insulation in a house. Toroidal effects increase thermal conductivity by two orders to approximately 400 times lower than a house. Real experiments have higher thermal conductivity still, around 40 times lower than house insulation. We can improve this through advanced modes of operation – but ITER does not rely on these. © 2025 Gauss Fusion GmbH - confidential 75 Plasma heating Simply starting up a tokamak plasma and driving a current of ~3 MA (e.g. JET) raises the temperature to around 3 keV or 30 million K (through resistive heating). Maximum that can be achieved this way is ~3.3 keV; need >4.4 keV before alpha heating starts overcoming radiation losses. The main options beyond that are neutral beam injection (NBI) or radio frequency (RF) heating. Both techniques work and have different strengths and weaknesses. For a tokamak (and a stellarator, for MHD control purposes) we also want CURRENT DRIVE from these systems © 2025 Gauss Fusion GmbH - confidential 76 NBI JET NBI injector ITER high energy, negative ion acceleration NBI system. © 2025 Gauss Fusion GmbH - confidential 77 RF heating Because the particles in the plasma are charged they will interact with radio waves, especially those that are at plasma resonant frequencies. But for the same reason the propagation of radio waves in a plasma is very complex. With the different masses of ions and electrons there are a range of possibilities for frequencies, interactive with ions (~50 MHz), electrons (~100 GHz) or (more complex) at intermediate hybrid frequencies (~5 GHz). These are usually called ICRH, ECRH, or LHCD – the latter usually considered as a current drive rather than a heating scheme. © 2025 Gauss Fusion GmbH - confidential 78 RF heating: ECRH • Can be generated far from plasma and injected down a mirroring waveguide (good for neutron shielding) • ITER developing 170 GHz gyrotrons (6 T), suitable for FPP • Higher frequency for higher fields only as concepts © 2025 Gauss Fusion GmbH - confidential 79 RF heating: ICRH • Reliable systems available NBI beam duct Limiters LHCD antenna ICH antennae • • Divertor Requires an antenna inside torus Heats ions! © 2025 Gauss Fusion GmbH - confidential 80 Pros and cons: plasma heating NBI needs to generate ions, accelerate them to large energies, and re-neutralise them. This tends to lead to large systems. At present high efficiency is hard to achieve, especially at high energy. RF systems tend to be more efficient in generation but can have difficulties coupling waves to the plasma. For instance at ICRH frequencies, the waves can only be injected by an antenna very close to the plasma otherwise little energy gets in. An enormous advantage of these systems is that they can also drive currents in the plasma, allowing steady-state operation and control of the current profile for improving stability, energy confinement, etc. Ideally want delicate parts far from fusion plasma -> ECRH for FPP © 2025 Gauss Fusion GmbH - confidential 81 Plasma currents Plasma currents of many mega-amps are an important part of operating a large tokamak. Toroidal current supplies the plasma poloidal field which helps stabilise the plasma. At fusion temperatures the electrical resistivity is low, comparable to copper, so (much) less than 1V is required to drive the current through transformer action. However a transformer is intrinsically AC, so a steady-state (or DC) tokamak relies on self-driven (bootstrap) currents and external current drive. © 2025 Gauss Fusion GmbH - confidential 82 Ohmic current drive But… resistivity decreases with temperature, while radiative losses increase. Maximum temperature achievable ~3.3keV. Therefore we need additional heating. Also intrinsically a pulsed operation, therefore need additional current drive to achieve steady-state. © 2025 Gauss Fusion GmbH - confidential 83 Current drive Instead of using the inductive effect of the transformer circuit, plasma current can be driven by e.g. Injected directed neutral beams Injected travelling RF waves In existing machines, the best current drive efficiencies allow up to 0.3A current to be supported by 1W of power. This would be sufficient to support a power plant in steady state, with approximately 30MA and 100MW. This is expected to be harder in real power plants, but we need to confirm how much harder (increasing T is beneficial; increasing n and R is not). © 2025 Gauss Fusion GmbH - confidential 84 Current drive in JET Plasma current maintained with no applied voltage. Litauden et al, “Towards fully non-inductive Current Drive Operation in JET”, EFDA–JET–PR (01)65 © 2025 Gauss Fusion GmbH - confidential 85 INHERENTLY LONG PULSE Stellarators are steady-state by nature https://www.linkedin.com/posts/max-planck-institutefor-plasma-physics_fusionenergy-nuclearfusionscience-activity-6998650642382618627vIXI?utm_source=share&utm_medium=member_deskt op © 2025 Gauss Fusion GmbH - confidential Figure 3. Time traces of the long pulse scenario with a total discharge length of 480 s: ECR heating power and mean plasma density (top), diamagnetic energy and toroidal bootstrap current (middle), and the divertor surface temperature (bottom). O. Grulke et al 2024 Nucl. Fusion 64 112002 86 Predicting future performance Multi-machine database regression. Plus, increasingly, theory and simulation-based models. © 2025 Gauss Fusion GmbH - confidential 87 STELLARATOR SCALING LAWS GIGA does not require significant improvement in confinement • • Physics of GIGA is within reach of existing databases πiss04 ≤ 1 Challenge is building coils GIGA GIGA Adapted from A. Dinklage et al 2007 Nucl. Fusion 47 1265 (Fig 7) © 2025 Gauss Fusion GmbH - confidential Adapted from R. Wolf et al. 2019 Phys. Plasmas 26 082504 (Fig 14) 88 How do we build a thing like this? What is Systems Engineering? Process to develop something that’s too complex to build as a single entity • Build the right system • Build the system right Why do Systems Engineering? Sub-systems have individual & local idealities • System optimisation • Early incorporation structures Concept Phase approach • Complexity & risk management beyond Concept Phase • Fundamentals of Systems Engineering Stakeholder needs & objectives • Systems & functionality decomposition • Defining & controlling interfaces • Defining various requirements • Risk assessment • Trade-offs & optimisation • Technology Verification & Validation planning • © 2025 Gauss Fusion GmbH - confidential 89 MITIGATING PROJECT RISK Choose the best available technologies, design around them Make your unique project look as much like a previous one as possible Make it as modular as possible How Big Things Get Done – Bjorn Flyvbjerg Downselection of materials and technologies: • HCPB-like blanket, 170 GHz gyrotrons, superconductors with a supply chain • Codified materials • Take safety and regulatory requirements into account from the start • Design in margin – the most optimised plant is the one that works • Steady-state is your friend, avoid cyclic loading • Economics dominated by availability • Larger components are harder to handle (logistics, assembly…) © 2025 Gauss Fusion GmbH - confidential 90 TECHNOLOGY ASPECTS Interdependent design requirements © 2025 Gauss Fusion GmbH - confidential 91 SYSTEMS ENGINEERING AND INTEGRATED ANALYSIS A stable, self-consistent design point for engineering confidence © 2025 Gauss Fusion GmbH - confidential 92 OVERVIEW OF THE CONSTRUCTION AND ASSEMBLY PROCESS Long manufacturing times require careful planning and prototyping Procurement © 2025 Gauss Fusion GmbH - confidential Manufacturing Prototype 93 STAGED COMMISSIONING Leveraging the commissioning process for maximum data © 2025 Gauss Fusion GmbH - confidential 94 GAUSS FUSION ROADMAP Roadmap to build first FPP in Europe by 2040s Phase 1 : Concept Phase 2 : Engineering 2023-2025 2026-2032 Conceptual Design Report Technical Design Report Phase 3a : Construction 2031-2038 Pre CDR Site selection Phase 3a : Commissioning 2037-2044 Stage 1 H Stage 2 D-T open Operation Stage 3 D-T closed First Plasma First T bred First GWe • Choice of Device: Stellarator • Choice of TBM concept: HCPB • Design of modular TBB • Magnet system definition • Design and test of demountable coils • Optimisation of the Stellarator design for operation and maintenance © 2025 Gauss Fusion GmbH - confidential • Blanket prototype • VV prototype • Magnet model coil • Optimized ECRH system • Integrated tritium fuel cycle test • Procurement of long lead time items • Design remote maintenance • Licensing processβ • Site preparation • Licensing approval • Major procurement activities • Delivery of components • Test and quality control • Assembly and construction • Test remote maintenance • Start of staged commissioning • Operational concept proven • Control systems optimisation • Start roll-out of fusion fleet 95 ENABLING TECHNOLOGY DEVELOPMENT ON THE FIVE-YEAR HORIZON Near-term milestones HTS tape delivery! Demountable cable joint tested with LTS and HTS conductors 2025 Validation of the demountable coil test model 2026 Blanket modelling to confirm concept © 2025 Gauss Fusion GmbH - confidential Manufacturing demonstration of 3D coil structural concept 2028 2027 ½-size demountable model coil tests 2029 Design for blanket module complete Assembly of module structural prototype Breeding blanket module test Design and Integration of divertor with fuel exhaust Demonstration of laser-based tritium surface measurement Demonstration of Fuel Cycle Reactor Interface Images: Gauss Fusion, ENEA, ASI 96 Conclusions A tokamak uses a combination of magnetic field coils and plasma currents to insulate the plasma, hold it in equilibrium, and prevent gross instabilities. Although there is always turbulence present in the plasma (as there is in flowing water), adequate insulation is still achievable. A combination of good insulation and high power heating allows high temperatures to be achieved. A steady-state tokamak is feasible using external current drive methods as well as self-driven currents. Stellarators are more complex from an engineering perspective, but inherently steady-state. There are limits on plasma pressure due to confinement, equilibrium, and stability. A high fusion gain relies on high pressure and high confinement time. Steady progress made over last half-century but considerable engineering effort remains to achieve the goal. We need to build on what ITER has started. © 2025 Gauss Fusion GmbH - confidential 97 Questions? © 2025 Gauss Fusion GmbH - confidential 98 Questionnaire Thank you for your attention! © 2025 Gauss Fusion GmbH - confidential 99
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )