Ericsson Internal RBS6000 3RD CARRIER EXPANSION Prepared (also subject responsible if other) 1 (24) No. Lai Le Approved Checked Date Rev 7/9/2015 PA1 Reference 3rd Carrier Expansion Procedure RBS 6601 (Dual DUW) VNP 3G Expansion 2015 Ericsson Internal RBS6000 3RD CARRIER EXPANSION Prepared (also subject responsible if other) 2 (24) No. Lai Le Approved Checked Date Rev 7/9/2015 PA1 Reference Contents 1. Introduction ............................................................................................................................3 2. Hardware: Expanding 3x3 for RBS6601 by adding 2nd DUW. ...............................................3 3. Re-Configure: Expanding to 3rd Carrier (Dual DUW) .............................................................4 3.1 Activities will not disturb traffic: ........................................................................................4 3.2 Activities will disturb traffic: ...............................................................................................9 3.2.1 Export and Delete configuration data for cabinet & site wizards on 1st DUW. .......................9 3.2.2 Make sure the ManagedElementData=1 with autoConfigurationAllowed is true .................11 3.2.3 Connect IDL cable and link cable from port F to F the both DUWs. ...................................12 3.2.4 Turn on power of 2nd DUW. ..................................................................................................12 3.2.5 Run Cabinet Equipment Configuration from 1st DUW to add the 2nd DUW. .........................12 3.2.6 Waiting synchronization at the both DUWs. .........................................................................19 3.2.7 Load site equipment script (new SE script). .........................................................................21 3.2.8 Deblock utrancell/run baseline at RNC (Contact with OMC enginner for these activities) ...24 3.2.9 Check alarm & clear if have any new alarms appear. ..........................................................24 3.2.10 Make sure all cell carriers are enable & handle traffic normally and approved by OMC before leave site. ..................................................................................................................24 Ericsson Internal RBS6000 3RD CARRIER EXPANSION Prepared (also subject responsible if other) 3 (24) No. Lai Le Approved Checked 1. Date Rev 7/9/2015 PA1 Reference Introduction This document describes the procedure of expanding a RBS6601 to a 3rd carrier configuration. Information about hardware and how to install new hardware units will be explained in this document. Besides, this document will mention the step by step for reconfigure dual DUW onsite. 2. Hardware: Expanding 3x3 for RBS6601 by adding 2nd DUW. Materials required: – 2nd MU RBS6601 (Included 01 DUW 31). – IDL cable (RPM 777 263). – F to F cable (RPM 777 279). – EC Bus cable from port AUX of 1st DUW to port EC X of 2nd MU RBS6601. Installation: 1 2 (Note: Connect the connector with “PRIM” to the 1st DUW and the connector with “SEC” to the 2nd DUW) Ericsson Internal RBS6000 3RD CARRIER EXPANSION Prepared (also subject responsible if other) 4 (24) No. Lai Le Approved Checked 3. Date Rev 7/9/2015 PA1 Reference Re-Configure: Expanding to 3rd Carrier (Dual DUW) 3.1 Activities will not disturb traffic: - Need 3 types of cable for RBS6000 (Included: Splitter, Serial Cable, RS232-USB & Ethernet Cable). • Splitter cable diagram: Ericsson Internal RBS6000 3RD CARRIER EXPANSION Prepared (also subject responsible if other) No. Lai Le Approved Checked Date Rev 7/9/2015 PA1 • Serial cable diagram: • RS232 – USB & Ethernet straight cable: Reference 5 (24) Ericsson Internal RBS6000 3RD CARRIER EXPANSION Prepared (also subject responsible if other) 6 (24) No. Lai Le Approved Checked Date Rev 7/9/2015 PA1 Reference - EMAS & Hyper Terminal software is ready on laptop. - Install new MU6601 & DUW31 on rack 19” and must be nearly with existing RBS 6601. - Install grounding cable for new MU6601. - Install cable power for new MU6601 from power cabinet. - Make sure that power supply for new MU6601 is working and ready to power ON. - Need login 1st DUW by Emas to create a new backup CV with name: sitename_Backup_daymonthyear. - Remember capture screen of alarm list on existing RBS6601 before actions - Turn on power of the 2nd DUW31. But not yet connect IDL cable and link cable from port F to F at the both DUWs. Ericsson Internal RBS6000 3RD CARRIER EXPANSION Prepared (also subject responsible if other) No. Lai Le Approved Checked Date Rev 7/9/2015 PA1 Reference - Use serial cable & hyper terminal software to perform format 2nd DUW31: Open hyper terminal: 7 (24) Ericsson Internal RBS6000 3RD CARRIER EXPANSION Prepared (also subject responsible if other) No. Lai Le Approved Checked Date Rev 7/9/2015 PA1 Change to backup mode status to perform format by command: To appear c2 hard disk. Reference 8 (24) Ericsson Internal RBS6000 3RD CARRIER EXPANSION Prepared (also subject responsible if other) 9 (24) No. Lai Le Approved Checked Date Rev 7/9/2015 PA1 Reference Perform format c2 & d hard disk. Turn off power of 2nd DUW. 3.2 Activities will disturb traffic: Attention: Please contact with OMC engineer to confirm for Soft Lock before starting next activities. 3.2.1 Export and Delete configuration data for cabinet & site wizards on 1st DUW. Ericsson Internal RBS6000 3RD CARRIER EXPANSION Prepared (also subject responsible if other) No. Lai Le Approved Checked Date Rev 7/9/2015 PA1 Reference Save to your laptop Tick on Delete mark 10 (24) Ericsson Internal RBS6000 3RD CARRIER EXPANSION Prepared (also subject responsible if other) No. Lai Le Approved Checked Date Rev 7/9/2015 PA1 Reference Export & delete process completed. 3.2.2 Make sure the ManagedElementData=1 with autoConfigurationAllowed is true 11 (24) Ericsson Internal RBS6000 3RD CARRIER EXPANSION Prepared (also subject responsible if other) No. Lai Le Approved Checked Date Rev 7/9/2015 PA1 Reference 3.2.3 Connect IDL cable and link cable from port F to F the both DUWs. 3.2.4 Turn on power of 2nd DUW. 3.2.5 Run Cabinet Equipment Configuration from 1st DUW to add the 2nd DUW. From Tools ---> Cabinet Equipment Configuarion ---> click Next Appear a window of Cabinet Equipment Configuration page ---> Click Next 12 (24) Ericsson Internal RBS6000 3RD CARRIER EXPANSION Prepared (also subject responsible if other) No. Lai Le Approved Checked Date Rev 7/9/2015 PA1 Reference Preparing and detecting process of 2nd DUW. The both DUWs will be restarted automaticlly and Emas will be disconnected. i. ii. iii. iv. v. vi. vii. viii. ix. Waiting for until the Emas is reconnected ---> Click Continue 13 (24) Ericsson Internal RBS6000 3RD CARRIER EXPANSION Prepared (also subject responsible if other) No. Lai Le Approved Checked Date Rev 7/9/2015 PA1 Click Next Make sure selected: RBS product name: RBS6601W Climate system: Extended Reference 14 (24) Ericsson Internal RBS6000 3RD CARRIER EXPANSION Prepared (also subject responsible if other) No. Lai Le Approved Checked Date Rev 7/9/2015 PA1 Reference Click Next for power supply configuration. Hub position is empty. No need choose ---> Click Next. Emplty If 2nd DUW doesn’t appear, It might not be detected by the primary. If that happens, please check: - IDL cable and F to F cable connection. - We need to repeat cabinet equipment configuration again. 15 (24) Ericsson Internal RBS6000 3RD CARRIER EXPANSION Prepared (also subject responsible if other) No. Lai Le Approved Checked Date Rev 7/9/2015 PA1 Click Next for show Ethernet link. Show all info of RBS configuration finally ---> Click Finish. Reference 16 (24) Ericsson Internal RBS6000 3RD CARRIER EXPANSION Prepared (also subject responsible if other) No. Lai Le Approved Checked Date Rev 7/9/2015 PA1 Reference Confirm automatic restart when finished configuration by click “Yes”. Emas will disconnect again ---> waiting for until Emas reconnects. 17 (24) Ericsson Internal RBS6000 3RD CARRIER EXPANSION Prepared (also subject responsible if other) No. Lai Le Approved Checked Date Rev 7/9/2015 PA1 Reference Click Continue After run configuration completed, the window will be closed automatic. 18 (24) Ericsson Internal RBS6000 3RD CARRIER EXPANSION Prepared (also subject responsible if other) 19 (24) No. Lai Le Approved Checked Date Rev 7/9/2015 PA1 Reference 3.2.6 Waiting synchronization at the both DUWs. - After cabinet equipment configuration completed, the synchronization process is loading the both DUWs. - Wait until the synch status of the 2nd DUW is “PassiveReady”. - The synch time is about 20-25 mins. - Can check synch status at 2nd DUW by below command at hyper terminal. (May be use this command, but not sure it’s working). - Firstly, observe the 2nd DUW’ staus is “StandbyPassiveNot Ready” at hyper terminal: Ericsson Internal RBS6000 3RD CARRIER EXPANSION Prepared (also subject responsible if other) 20 (24) No. Lai Le Approved Checked Date Rev 7/9/2015 PA1 Reference - Also observe at the 1st DUW staus by Emas: Synchronization status hasn’t yet completed (PassivenotReady) - Still be waiting, until the synchronization process is completed. At hyper terminal will appear a message “Disks are synchronized”. & at 1st DUW will see the 2nd DUW status is “PassiveReady”. - When Synchronization process is completed ---> Create a new CV with “startable” usage ---> perform restart Node B (It take about 2 mins). Ericsson Internal RBS6000 3RD CARRIER EXPANSION Prepared (also subject responsible if other) No. Lai Le Approved Checked 3.2.7 Load site equipment script (new SE script). Tools Site Equipment Configuration Click Next Date Rev 7/9/2015 PA1 Reference 21 (24) Ericsson Internal RBS6000 3RD CARRIER EXPANSION Prepared (also subject responsible if other) No. Lai Le Approved Checked Date Rev 7/9/2015 PA1 Tick on use configuration file ---> Tick on Automatic (no Wizard) Browse to SE script file at your laptop --> click Next Reference 22 (24) Ericsson Internal RBS6000 3RD CARRIER EXPANSION Prepared (also subject responsible if other) No. Lai Le Approved Checked Date Rev 7/9/2015 PA1 Click finish Waiting until see Configuration Completed Successfully. Loaded SE script successfully. Reference 23 (24) Ericsson Internal RBS6000 3RD CARRIER EXPANSION Prepared (also subject responsible if other) 24 (24) No. Lai Le Approved Checked Date Rev 7/9/2015 PA1 Reference 3.2.8 Deblock utrancells/run baseline at RNC (Contact with OMC enginner for these activities). 3.2.9 Check alarm & clear if have any new alarms appear. 3.2.10 Make sure all cell carriers are enable & handle traffic normally and approved by OMC before leave site.
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )