Structural Engineering English Corner
楷德电子工程设计有限公司
CHINA KIDE ENGINEERING CORPORATION
CONTENTS
一 专业词汇
Professional Vocabulary
二 文档学习
Document Study
三 听力练习
Listening Practice
四 口语表达
Oral Expression
Structural English
目 录
steel structure
Portal
门式刚架(AISC)
Rafter
屋面梁(斜梁) 斜向布置的主承重梁
Girder
主梁 用于大跨度承重构件(如吊车梁)
Column
钢柱
Purlin
檩条
Brace (Compression Brace)
支撑 (轴压支撑)
(轴拉支撑)
(Tension Brace)
Base Plate
底板
Structural English
01 Professional Vocabulary
Beam-to-Column Connection
刚性连接
半刚性
铰接
螺栓
Bolt
焊缝
(Fillet Weld)
Gusset Plate
(对接焊缝)
(角焊缝)
节点板
Structural English
01 Professional Vocabulary
Roof Panel
Wall Cladding
Eave
Gutter
Eave Trim
Roof Slope
Slope
pitch
坡度
Structural English
01 Professional Vocabulary
Dead Load
恒荷载
Live Load
活荷载
Variable Action
可变作用
Span
跨度
Deflection
挠度
Fire Resistance
耐火性能
Structural English
01 Professional Vocabulary
5.2 Connections 连接
5.2.1 Connections shall be as shown on the drawings and as specified herein. 在此处指定(此规范指定)
5.2.2 Connections not shown on the drawings shall be designed as follows:
a) Moment connections 弯矩连接 shall be designed to develop the factored 考虑系数后的 moment resistance 弯矩抗力of
the weakest connected member部件.
b) Shear connections 剪力连接 shall be designed to develop the maximum shear force 最大剪力from structural analysis or
one half of the factored shear resistance 设计剪切抗力of the member being connected 所连接构件whichever is greater,
unless the shear is shown on the drawing.
c) Splices shall be designed to develop the factored tensile 受拉 resistance of the weakest connected member.
d) Bracing members shall have their axis of gravity 重力 meet at one point if practicable and if not, provisions规定、准备
shall be made for 为...做好准备additional stresses 附加应力due to the eccentricity偏心.
e) Shop connections shall be welded, or equivalently 等效地bolted, and field connections shall be bolted unless otherwise
shown on the drawings.
Structural English
02 Document Study
5.2 连接
5.2.1 连接应按图纸所示及本规范规定进行。
5.2.2 图纸未显示的连接应按以下方式设计:
a) 弯矩连接的设计应能发挥最弱连接构件的设计弯矩抗力。
b) 剪力连接的设计应能承受结构分析得出的最大剪力,或所连接构件设计抗剪承载力的一半,取两者中的较大值,
除非图纸中另有说明。
c) 拼接连接的设计应能发挥最弱连接构件的设计抗拉抗力。
d) 受力构件的重心轴应在可行时汇交于一点,若无法做到,则应考虑因偏心产生的附加应力。
e) 车间连接应采用焊接,或等效的螺栓连接;现场连接应采用螺栓连接,除非另有规定。
Structural English
02 Document Study
factored load 设计荷载; tensile strength 抗拉强度 ; equivalently 为等效地、等同地;
provisions 规定、条款 ; Shop connections 车间连接 ; Field connections 现场连接;
equivalently bolted 高强度螺栓连接
Provisions for seismic design should be followed in high-risk areas.
高风险地区应遵循抗震设计的规定
force 力
tensile force 拉力;
pressure force 压力;
shear force 剪力 .
Structural English
02 Document Study
Structural English
03 Listening Practice
Engineer(工程师):
Good morning, Mr. Smith. Thank you for joining the call. Let’s start with the basic info of the project. You
mentioned it’s a 10-story residential building. Could you share the architectural layout? For example, do the
lower floors require open spaces for parking or commercial use?
(早上好,史密斯先生。感谢您参加会议。我们先从项目基本信息开始。您提到这是一栋 10 层住宅
楼,能否介绍一下建筑布局?比如低层是否需要用于停车或商业的开放空间?)
Client(客户):
Yes, the ground and first floors are for parking, so we need large column-free spaces. The upper floors are
apartments, so the structure should be regular and efficient.
(是的,底层和一层是停车场,因此需要大跨度无柱空间。上层是公寓,所以结构需要规整且高效。)
Structural English
04 Oral Expression
Engineer:
Understood. For the column-free spaces, a post-tensioned concrete slab system might be suitable. It can span
up to 9 meters without columns, reducing structural depth. Would you prefer concrete or steel for the main
structure?
(了解。对于无柱空间,后张法混凝土板体系可能适用,它可以实现 9 米跨度无柱,减少结构层高。
主体结构您倾向于混凝土还是钢结构?)
Client:
Steel is faster to construct, but we’re concerned about cost and fire resistance. What’s your recommendation?
(钢结构施工更快,但我们担心成本和耐火性。您有什么建议?)
Structural English
04 Oral Expression
Engineer:
Both options work. Concrete is more cost-effective for residential buildings and has better fire resistance,
though construction takes 20% longer. Steel can speed up the schedule but requires fireproofing coatings,
which add to the cost. Based on your budget and timeline, concrete frame would be more economical.
(两种方案都可行。混凝土用于住宅更经济,耐火性更好,但施工周期长 20%。钢结构可加快进度,
但需要防火涂层,增加成本。结合您的预算和工期,混凝土框架更经济。)
Structural English
04 Oral Expression
THANK YOU!
Structural Engineering English Corner
楷德电子工程设计有限公司
CHINA KIDE ENGINEERING CORPORATION