AutoCAD Project:
Ryzbanel City
Group E: Ryan Persaud, Lizbeth Loja, Manuel Nicolas
PROJECT OVERVIEW
This project we are tasked to design a
site plan that requires a supermarket, a
basketball court, 10 apartment buildings
with city amenities such as healthcare,
schooling, police, firestation, and more.
2
Detailed Site Analysis
1.
Topography
2.
Soil Composition
3.
Vegetation
4.
Hydrology
Channel name
Channel name
3
Site Analysis Data Collection
Average Ground Level Contour (Slope) GS
Average Bearing Capacity BCavg
Site
Avg BC
GBC
Site
Avg BC
GBC
A
0
0
A
0.00828406
10
B
3000
3.75
B
.00433435
4.32
C
8000
10
C
0.0017361
0.59
D
3000
3.75
D
0.00740641
8.74
E
3500
4.375
E
0.00225446
1.33
F
8000
10
F
0.00138977
0.09
G
8000
10
G
0.00644212
7.35
H
8000
10
H
0.00151334
0.27
I
6500
8.125
I
0.00132807
0
4
Site Analysis Data Collection
Vegetation Cover
Avg Water Table Level (G_WT)
Site
Avg BC
GBC
Site
Vegetation Cover
G_VC
A
0.01004455
0.98251354
A
95%
9.5
B
0.02103403
2.29438591
B
90%
9.0
C
0.04664908
5.35218993
C
30%
3.0
D
0.01228587
1.25007177
D
40%
4.0
E
0.00181409
0
E
15%
1.5
F
0.08558352
10
F
85%
8.5
G
0.00229655
0.0575938
G
5%
0
H
0.00309917
0.15340679
H
80%
8.0
I
0.00195459
0.01677222
I
93%
9.3
5
Total and Weighted Site Analysis
Site
Total Grade
Weighted Grade
A
20.48251534
5.47325
B
19.36438591
5.08794
C
18.94218993
4.96222
D
17.74007177
5.05951
E
7.205
2.30525
F
28.59
6.65200
G
17.4075938
5.71076
H
25.50340679
5.59634
I
17.44177222
5.17043
Factor’s Weighted Analysis
Soil Type : 0.35
Green Cover: 0.25
Slope: 0.3
Ground-Water Depth: 0.1
6
Final Site Selection
The site we chose to
construct our site plan on is
Site F. Site F was chosen for
its superior soil strength, and
accessibility to the public.
Furthermore, with a wind
direction of North West, we
believe that the wind strength
should weaken when it gets
to our site.
7
8
9
10
11
12
Apartment Placement Theory
Why did we Place the Apartments Where We Did?
1) We wanted an apartment complex, with a form of
community
2) It is easier to strategically place city services and
amenities if zoning is predictable and simple
3) Proper space was allocated for the Apartments to
ensure a proper fit.
4) Due to a high population of citizens we wanted to place
the apartments next to main roads to service the high
traffic. This leads to road design…
Road Characteristics
-
Crosswalks are 10’ wide
Sidewalks 8’ wide
Parallel Parking 8’ wide
Driving lanes 12’ wide
Median ranges from 4’, 5’, and 10’
All widths are in compliance with the NYC Street Design
Manual, published by the NYCDOT.
Road Design Theory
1)
2)
3)
4)
5)
Roads are meant to flow from Arterial (large) to Auxillary (medium) to Local (small) roads. This is known as
road hierarchy.
The apartments and Supermarket will be high traffic roads, which were placed on the arterial roads to combat
this issue.
Continuing on from point 2, commercial areas were placed around Auxiliary roads, where residential areas were
placed around local roads.
Dedicated turning lanes to prevent the backup of traffic where preventable
Grid layout due to simplicity, and no noticeable influx of traffic that warrants more complex thought processes.
13
School Placement Theory
1)
2)
3)
4)
5)
6)
7)
Elementary and Middle Schools were placed adjacent
to provide a familiar setting for children who may
otherwise feel overwhelmed from a change in scenery.
Elementary and Middle Schools placed around
residential areas due to a more quiet and less
dangerous environment, such as high speed vehicles on
arterial roads.
High School placed around commercial areas to
promote business and a healthy afterschool
environment
College placed near a mix in residential and
commercial area due to the large size of the schools
lead to inevitable overlap.
2 Public Parking Lots to prevent unnecessary traffic
from finding parking
Commercial area placed near College to once again
promote businesses, and after school options for hard
working students. (Cafe’s, deli, restaurant, Recreation)
All Schools will have on site/campus playgrounds and
gyms.
Zoning Ideology
1)
2)
3)
Commercial, and office zoning are placed near
arterial, and auxiliary roads to promote business,
and service the influx of traffic during rush hour.
Residential zoning placed on local roads to decrease
noise and light pollution.
Mixed-Use near Colleges to provide affordable
housing for renting students, with easy access to
shops and restaurants.
14
15
16
17
Ground
Floor
Channel name
Channel name
18
Ground Floor
❖
❖
Lobby:
➢
➢
➢
Receptionist
Waiting Room
Mail Area
2 Apartments
Channel name
➢
➢
➢
➢
➢
2 Standard Size Bedrooms Total
2 Bathrooms Total
Dining Area with open Kitchen
Big Living Room Area
2 Offices Total
❖
Building Includes:
➢ Spacious Gym
➢ Laundry Room
❖
For Employees:
➢ Employee Locker Room
➢ Employee Bathroom
➢ Boiler Room
➢ Janitorial Closet
➢ Security Room
Channel name
19
Second
Floor
Second Floor
❖
4 Apartments
➢ 12 Bedrooms Total
■ 4 Bedrooms with Walk In Closets
■ 2 Smaller Bedrooms
■ 4 Bathrooms Total
■ 4 Offices Total
Third Floor- MANUEL
❖
2 Apartments:
Each Apartment contain
➢ 4 Rooms Total
■ 1 Master Bedroom
■ 2 Standard BedRoom
■ 1 Guest Bedrooms
Channel
➢name
2 Bathrooms:
■ 1 Master Bathroom
■ 1 Guest Bathroom
➢
➢
➢
➢
➢
Closets:
■ 4 Walking closet
■ 1 storage Closet
■ 1 lines closet
■ 1 office closet
■ 1 Coats Closet
■ 1 Walk-In Pantry
1 Home Office
1 Entertainment Room
1 Home Gym
1 Home Laundrie
➢
1 Balconie
Channel name
22
Third
Floor
Channel name
Channel name
23
Elevation Plan
❖
Each floor have 3.05 meter = 10 ft
IBC minimum ceiling height is 2.29 m
❖
Deck:
-Ground Floor Deck 0.30 m (Excellent for insulation + strength)
-Second Floor Deck 0.25 m (Efficient and lightweight)
-Roof Deck (Top Floor) 0.30 m (Good for waterproofing, equipment,
or rooftop use)
❖
The Deck thicknesses (0.25–0.30 m) comply with IBC as long as
they:
- Support a live load of 1.92 kN/m² (40 psf or more)
-Meet deflection limits (L/360)
-Provide 1-hour fire resistance between floors (with proper concrete
cover or ceiling)
-Follow ACI 318 for reinforcement
24
Ground Floor
Section ABCD
First Floor
Second Floor
25
1. Bottom Bar
●
B.B. = Bottom Bar
●
Refers to the bottom reinforcement bar in a slab, beam, or foundation.
●
(2.5) usually means the diameter of the bar → 1.6 cm (which is about a #5 bar in
U.S. units).
2. Tiles = 0.8 cm Thickness
3. Coping = is the cap that protects the top of your walls (especially parapet and
balcony walls) from water damage.
4. Sand Bed: is a layer of compacted sand used as a base under:
●
Concrete slabs
●
Tiles (floor or exterior pavements)
●
Pavers or interlock blocks
●
Foundations or footpaths
B.B. (2.5)
We Used a 10 cm (0.10 m) thick compacted sand bed
5. GL stands for Ground Level. The bottom of the footing must be 1.20 meters deeper
than the natural ground level.
6.P.C.C stands for Plain Cement Concrete. We use 0.6 m thickness
26
Foundation Sizes of the Building
Value (m)
Description
Slab thickness
0.3000
Structural slab (deck)
thickness, perfect for
multi-story
Column embedment
below GL
0.9000
Now this is deep and
secure, provides
excellent anchorage
Footing thickness
(R.C.C.)
0.3500
Strong footing for a 3level building
Footing width
0.7590
Sufficient base width for
load distribution
Total depth below
ground level
0.9000 + 0.3500 = 1.25 m
Exceeds NYC frost line
(1.20 m) – Code
Compliant and IBC
Element
27
Beam - Column Plan
28
Elevator
MANUEL
(??)
Elevat
or
Beams
&
Columns
-MANUEL
●
Columns are in Magenta
3m x 2.5m (???)
●
●
●
EXTERIOR: Reinforced Concrete Masonry Unit (CMU) LoadBearing Wall
○ According to the IBC Code, it is fire- resistant (1-2
hour fire rating)
○ name
Aesthetics: Polished CMU
Channel
Channel name
All of the windows are placed in the same spot for symmetry
and aesthetic appeal.
Bathrooms and kitchens are placed above each other for easy
plumbing, wiring, HVAC, etc.
○ If one of the apartments has “water failure”, bathroom
water would leak into the bathroom below and NOT in
the kitchen.
31
Elevation View
manuel
32
Parking Lots
There are a total of 120 units
About 10-12 people working in
each apartment
There are a total of 200 parking
spaces
●
40 of the parking spaces
are reserved for ADA
Accessibility Parking
Each apartment resident might
have 2 cars something
sosmehting
33
Basketball
Court
●
●
●
4 Basketball courts
Each 4700 sq ft
94’ x 50’
34
Site Selection
Site F was determine to be the best
according to our Site Selection
analysis and weighted sums.
Project Summary
&
Next Steps
Design Phase
-
-
Apartments kept close to create an
apartment complex
Use of a Grid Layout due to simplicity
Road and Zoning logistics were used
to create a realistic plan
Future Steps
-
-
Eager buyers purchase plots of
land to build housing and
stores.
Create the buildings following
IBC and ADA code.
35