Journal Pre-proof A New Holistic Framework for Megaproject Portfolio Success Thomas Tepstad Berge, Bassam Hussein, Haavard Haaskjold PII: S2666-7215(25)00015-8 DOI: https://doi.org/10.1016/j.plas.2025.100190 Reference: PLAS 100190 To appear in: Project Leadership and Society Received Date: 24 January 2025 Revised Date: 19 August 2025 Accepted Date: 24 August 2025 Please cite this article as: Berge, T.T., Hussein, B., Haaskjold, H., A New Holistic Framework for Megaproject Portfolio Success, Project Leadership and Society, https://doi.org/10.1016/ j.plas.2025.100190. This is a PDF file of an article that has undergone enhancements after acceptance, such as the addition of a cover page and metadata, and formatting for readability, but it is not yet the definitive version of record. This version will undergo additional copyediting, typesetting and review before it is published in its final form, but we are providing this version to give early visibility of the article. Please note that, during the production process, errors may be discovered which could affect the content, and all legal disclaimers that apply to the journal pertain. © 2025 Published by Elsevier Ltd. A New Holistic Framework for Megaproject Portfolio Success Authors: Thomas Tepstad Berge (NTNU) / thomastb@stud.ntnu.no (Corresponding Author) Bassam Hussein (NTNU) / bassam.hussein@ntnu.no Haavard Haaskjold (NTNU) / haavard.haaskjold@ntnu.no oo f Address: Jo ur na lP re -p r Institutt for Maskinteknikk og Produksjon, NTNU, 7491 Trondheim, NORWAY Jo na ur re lP ro -p of Title: Jo ur na lP re -p r oo f A New Holistic Framework for Megaproject Portfolio Success Abstract re -p r oo f Portfolios comprising multiple megaprojects are increasingly prevalent across various industries, yet literature at the intersection of project portfolio management and megaproject management remains limited. This study addresses this research gap through a systematic literature review of 37 peer-reviewed articles, identifying specific practices that significantly impact megaproject portfolio success. Three critical drivers for success have emerged from this study: Proactive disposition, emphasizing a culture of continuous knowledge sharing and uncertainty mitigation; Flexible governance, reflecting adaptable portfolio structures accommodating diverse contexts; and aligned leadership, highlighting the importance of strategic involvement and commitment of top management. The identified drivers have been used to develop a novel framework that is specifically tailored for megaproject portfolio management. The framework shows how each driver supports core project portfolio management activities like strategic alignment, resource allocation, and risk management, and how they influence key success measures including project performance, strategic fit, portfolio balance, and synergy realization. Our novel contribution is to transcend the potential silos of the established project portfolio management activities by using the three drivers for an outcome-based approach, better suited to navigate the complexity of managing multiple megaprojects. ur na lP Keywords: Project Portfolio Management; Megaprojects; Project Portfolio Performance; Systematic literature review 1 Introduction Jo Megaprojects are increasingly used to achieve strategic goals across sectors, with portfolios of such projects now emerging. NASA’s major project portfolio totals $81 billion (USGOA, 2024), while Saudi Arabia’s Vision 2030, anchored by the $500 billion NEOM programme, has a total estimated cost of $1.3 trillion (Burke & Abuljadayel, 2024), Even in mature sectors like Oil & Gas, portfolios comprising multiple megaprojects are becoming more common. Yet, megaprojects are notorious for poor performance. A study of 258 transportation projects across 20 countries over 70 years found only 10% avoided cost overruns (Flyvbjerg et al., 2003). Similarly, 75.1% of 401 reviewed energy infrastructure projects experienced cost overruns averaging $967 million each (Sovacool et al., 2014). The Olympic Games have a 100% record of budget overruns, with an average of 156% (Flyvbjerg et al., 2016). These issues have entered public discourse, as exemplified by the Berlin Brandenburg Airport, which opened 9 years late and €4 billion over budget (Landis & D. Landis, 2022), and was scrutinized in media such as the Radio Spaetkauf podcast . While managing a megaproject is evidently a handful, how should organizations then set themselves up to manage a portfolio of them? According to the Project Management Institute (PMI), a portfolio is “projects, programs, subsidiary portfolios, and operations managed as a group to achieve strategic objectives” (PMI, 2021). Unlike projects and programs, which focus on delivering specific outcomes or coordinating related efforts, portfolios enable organizations to align initiatives with strategic goals and optimize resource allocation. Megaprojects, due to their size and complexity, are frequently structured as programs. However, organizations, especially in infrastructure, defense, or energy sectors, often manage several such megaprojects simultaneously. From a corporate or governmental perspective, these can be viewed as a portfolio of megaprojects, managed to align with overarching strategic goals, balance risk, and optimize resource distribution across initiatives (Brookes & Locatelli, 2015). re -p r oo f This paper focuses on the firm-level strategic management of multiple megaprojects, conceptualizing them as a portfolio. This perspective allows us to explore portfolio-level challenges such as resource contention, prioritization, and governance, which differ from intra-program coordination issues. Another contrast between programs and portfolios is that in the latter there are often competing objectives as each project serves a different purpose in the overall portfolio objective. Jo ur na lP For organizations with several megaprojects, their project portfolio will most likely be their biggest piece in the overall strategy puzzle. Hence, if the project portfolio is not managed properly, it directly affects the ability of the organization to deliver on its goals, and ultimately its vision and mission. Organizations which are project-based are found in an increasing number of industries, including oil & gas, infrastructure, power and renewable energy, and construction, to mention some. A famous quote which is attributed to Mark Twain goes: “History never repeats itself, but it does often rhyme”. By proactively embracing portfolio management as a tool to deliver multiple megaprojects, we might avoid a history of cost and schedule overruns as we`ve seen for individual megaprojects, not only benefiting the organizations themselves, but also society at large given the widespread impact of these projects. Despite a robust body of research on megaprojects and project portfolios separately, limited attention has been given to the intersection: portfolios of megaprojects. This paper addresses that gap through a systematic literature review, aiming to answer the following research question: Research Question: How does Project Portfolio Management activities influence portfolio performance for Megaprojects? Where Project Portfolio Management (PPM) activities are those activities that are performed at the portfolio level, above the level of the individual projects. Some activities are specific for the portfolio like portfolio selection, while others are the same as you would see in projects, with the only difference that they are addressing the portfolio context like risk management, governance, etc. This paper consists of six main parts. Concept introduction will investigate the body of knowledge related to megaprojects and PPM to establish the required framework to further assess the research question. Methodology will describe the process used to answer the research question. Analysis and Findings presents the review-literature and its key findings. Conceptual framework presents the visualization of how the PPM activities affect PPM success and which drivers that are at play. Discussion will elaborate on the findings of the study. Lastly, we`ll conclude and address limitations and future recommendations in the section Conclusion and recommendations. 2 Concept introduction re -p r 2.1What is a megaproject? oo f The purpose of the concept introduction is to define the key terms that constitutes the research question. Once we have established what each construct entails, we will use this information to address all the relevant facets when reviewing and coding our review literature. Building upon this information we aim to develop a framework which puts all the pieces back together, but then in the context of managing a portfolio of megaprojects. Figure 1 summarizes the different concepts which will serve as framework elements in the following sections. Jo ur na lP Megaprojects are used by organizations across many industries to achieve their goals. According to the Oxford English Dictionary (2023) the word Mega means; “huge, great, substantial; much, many, a large quantity of”. As a project consists of many attributes, the question is then; a large quantity of what? Flyvbjerg (2014) defines megaprojects as “…largescale, complex ventures that typically cost US$1 billion or more, take many years to develop and build, involve multiple public and private stakeholders, are transformational, and impact millions of people”. While monetary value certainly simplifies the definition, it has also received criticism as other prominent attributes like complexity, ambiguity, risk, etc. can require the same organizational approach even though the cost is far below the US$1 billion (Davies & Mackenzie, 2014; Pollack et al., 2018). While a monetary threshold value has been used by different governments when scaling their governance towards larger projects, this approach has since become more granular in countries like the United Kingdom, where complexity and innovation now also affects the selection of which projects to include performed by their Infrastructure and Projects Authority (Volden & Samset, 2017). In this paper we define megaprojects by the following attributes: political sensitivity, long delivery span, high complexity, high risks, and a large number of both internal and external stakeholders (Hu et al., 2015). Even though we don’t specifically label the projects with a monetary value, a relatively high cost is an inevitable consequence of the forementioned attributes. 2.2 Project Portfolio Management activities The intention of PPM is to achieve strategic objectives (PMI, 2021). The objectives are, however at the organizational level, this gives PPM a different context than individual projects which need to be reflected in its activities. According to Kaiser (2015), structural alignment is a pre-requisite for successful PPM, meaning that the design of PPM and its processes should be based upon strategic information so that the organization is customized to implement its strategies. This notion is supported by Müller et al. (2008) who argues that no singular PPM system can accommodate the multidimensional performance interests of organizations, hence a more holistic approach which takes the context of the organization into consideration should be pursued. Strategic alignment with the organization is a key element for PPM, which entails ensuring that the totality of the portfolio is aligned with the strategy of the organization, this is an activity that requires continuous assessment (Cooper et al., 1997; Kaiser et al., 2015). The first step to ensure strategic alignment happens in the selection process of which projects to include in the portfolio. The activity of project selection and monitoring involves selecting new projects into the portfolio, tracking their performance, and terminating projects as required (Cooper et al., 1997; Kaiser et al., 2015; Müller et al., 2008). This implies that to be able to be selective about which projects to include, some projects will not make the cut. re -p r oo f To mature and deliver on the projects in the portfolio it’s important to know current constraints when it comes to available resources to avoid spreading oneself too thin. The activity of resource allocation involves allocating the finite resources to the different projects in line with project prioritization to maximize value creation (Blichfeldt & Eskerod, 2008; Cooper et al., 1997). This value creation is at the portfolio level; hence this is an area that requires transparent priorities and collaborative skills among all parties involved. ur na lP Once the projects have been sanctioned and properly resourced, a key activity to ensure that the portfolio obtains its objectives is risk management. In the portfolio it involves monitoring the interaction between project risks and assessing and managing portfolio level risk to ensure alignment with organizational risk appetite (Pajares & López, 2014; Teller & Kock, 2013). Jo Learning from experience and sharing those learnings across the portfolio is part of a continuous improvement cycle. Knowledge management in the portfolio consists of capturing, sharing, and implementing knowledge to improve both project and portfolio delivery (Jonas, 2010; Killen et al., 2008). In the knowledge-based view it is understood that it is the organization`s ability to effectively apply the existing knowledge to create new knowledge and then take advantage of this capability which creates competitive advantage (Alavi & Leidner, 2001). The portfolio level is the ideal arena to foster and facilitate this advantage. Portfolio communication is about effective communication with senior management, project managers, and other key stakeholders to the portfolio (Butler, 2022; Unger et al., 2012). The communication both enables decision-making by providing senior managers with quality information to prioritize in line with strategic objectives and provides transparency and strategic direction to the organization as those decisions and their premise is communicated across the portfolio (Butler, 2022). Lastly the PPM provides portfolio governance, which helps to ensure that the framework of processes, roles and responsibilities, and overall conditions are in place for efficient delivery of all PPM practices (Butler, 2022) This framework is both at the project and portfolio level, and it`s important to continuously institutionalize knowledge through it. 2.3 How does success differ from the portfolio to individual projects? According to Butler (2022), portfolio performance is a topic which is well covered in the PPM literature, but with the least amount of convergence of concepts. Success for a portfolio is multidimensional and needs to accommodate both operational and strategic performance (Unger et al., 2012). oo f Even though portfolio success is not the same as project success; the average performance of the individual projects is crucial to achieving the overall objectives. We will make a distinction between project management success, which focuses on the iron triangle of project management, and project success, which addresses how well the project realized the intended benefits (Cooke-Davies, 2002). While contextual differences among industries will apply, we aim to accommodate both aspects of project delivery and we therefore measure 1) success in relation to achievement of the iron triangle, and customer satisfaction (Meskendahl, 2010). re -p r Furthermore 2) synergy exploitation is a contribution from PPM which adds value beyond the contribution from the individual projects (Meskendahl, 2010), as it indicates how well the portfolio utilizes its resources, knowledge, etc. to deliver the totality of projects. Jo ur na lP In addition, Cooper (2002) highlights two other important elements for portfolio success, namely 3) the strategic fit of the portfolio with the overall strategy of the organization, and 4) the portfolio balance in relation to resources, risk and cash flow. The achievement of strategic fit is mostly connected to the activity of ensuring strategic alignment, where the contribution of the portfolio must be measured in relation to how well it supports the overall strategy of the organization. It’s important to note that as the strategy changes, it should imply that the portfolio needs to reflect this as well. The portfolio balance also plays a role in strategic alignment, as an example the overall risk of the projects needs to be aligned with the risk appetite of the portfolio. Furthermore, there may be resource constraints which affect the feasibility of pursuing certain projects, which need to be considered within PPM. It’s evident that the performance of a portfolio is more complex than for individual projects. The distinct attributes and scale of megaprojects will require PPM to distribute its efforts in a certain manner, this setup is not well covered in the literature, hence this is the gap we aim to address in this paper. In figure 1 we have summarized what defines a megaproject, and which PPM activities that support the success measures of the portfolio. oo f re -p r ur na 3 Methodology lP Figure 1: Visualization of the megaprojects` attributes, and the seven PPM activities which constitute the building blocks towards portfolio success Jo The area of use for a literature review is plentiful; it can provide overview of a body of knowledge within new topics, it can define its limits so that one avoids repeating already well covered topics, or it can make flaws or issues within current research transparent, etc. (Knopf, 2006). Given its many areas of usage, it also comes in many shapes; a literature review covers a wide range of subjects with varying degree of details, a scoping review usually quantifies and reviews the quality of literature within a certain field of study but does so without a formal quality assessment. We have chosen to perform a systematic literature review which in contrast has a set quality assessment procedure for which literature to include, it aims for an exhaustive search within a set topic, and through transparency mitigates biases (Grant & Booth, 2009; Tranfield et al., 2003). To emphasize transparency and completeness for the review we adhere to PRISMA (Preferred Reporting Items for Systematic reviews and MetaAnalyses). While systematic literature reviews have emerged and been most prevalent within all areas of healthcare, it has also migrated to other disciplines like management (Tranfield et al., 2003), though often performed with less rigor than we see within the area of medicine. Through the systematic literature review we aim for pragmatic research, which balance rigor and relevance to accommodate the needs of both academics and practitioners alike (Tranfield et al., 2003). This review used document type and publication language as initial inclusion parameters. The inclusion criteria and associated justification can be found in table 1. Table 1: Inclusion criteria used Parameters Document Type Criteria Peer-reviewed journal articles Language English Justification As this is an extending review, focus is on high quality articles which have gone through a rigorous scholarly review process. English is used for academic purposes. 3.1 Searching strategy This step involves using electronic databases to find relevant articles using search strings. The process is described in the following steps: re -p r oo f 1. Determine which databases to use. To ensure sufficient coverage of the field two databases are used for searching; Scopus and Web of Science (WoS) (Ewald et al., 2022). These are both reputable databases which are considered to have wide coverage of bibliometric data and supports multiple Boolean operators to ensure a comprehensive search. Snowballing searching was performed by using Google Scholar, Oria and Litmaps to ensure that no relevant articles were missed in the final selection. Jo ur na lP 2. Setting the search terms. The two key domains in our research question are Project Portfolio Management and Megaprojects. A joint effort by the authors was performed to define all relevant synonyms for both domains, also using the keywords and terminology used by example-articles as input. The final search string can be found in figure 2. To find literature entailing both domains the Boolean operator AND was used. Furthermore, OR was used to include all synonyms for the two domains, while asterisk (*) was used to include both singular and plural nouns of Megaproject(s). Exact phrases were searched for using quotation marks (“”). In Scopus the search was performed within article title, abstract and keywords. In Web of Science the search was run for title, abstract, author keywords, and keyword plus. 3. Search results. Prior to implementing the inclusion criteria WoS generated 138 results, while Scopus generated 281 results, a total of 419. After applying the inclusion criteria, the total was 195 (WoS: 71 and Scopus 124). These findings were in stark contrast to the number of articles within only one topic, as megaprojects resulted in several hundred thousand hits, while PPM resulted in about twenty thousand. 4. Screening. To perform the screening Rayyan was used. Bibliometric data were exported from the two databases, and the first step was to identify and remove duplicates. After the removal of duplicates 141 articles were left for eligibility assessment. 5. Eligibility assessment. Titles and abstract for all remaining articles were assessed in relation to their relevance to the research question. While most of the articles covered both domains, we also chose to include some that only covered one domain, as detailed understanding of the domains by themselves also was deemed relevant to address the research question. This review ended with 38 included articles. Based on these articles further snowballing searches were performed using Google Scholar, Oria and Litmaps, resulting in two additional articles, ending with 40 articles. After full-text reading of all articles three articles were removed due Jo ur na lP re -p r oo f to lack of relevance for the research question, resulting in 37 articles for the review. This process adhered to a modified PRISMA flow diagram as shown in figure 2, where the modification is the inclusion of the search string to further enhance the transparency and replicability of the process. Figure 2: Modified PRISMA diagram 3.2 Data extraction and Synthesis approach The chosen synthesis approach was to perform an inductive thematic analysis, as we are focusing on a particular research question (Xiao & Watson, 2019). The coding process of open, axial, and selective coding is a non-linear cyclical process which evolves through reading and re-reading to ultimately develop theory based on the literature (Williams & oo f Moser, 2019). None of the themes were deemed final until all articles were read, and codes had been assessed several times (Nowell et al., 2017). Prior to starting with the coding, the authors read several full-text articles to align coding design and its definitions. For open coding we focused on all elements mentioned in the literature which had impact on portfolio performance, grouping them together to consolidate meaning and explanation (Williams & Moser, 2019). Secondly, we developed the axial codes which aims at developing categories by combining open codes which are interrelated or overlapping (Williams & Moser, 2019). Lastly, the selective codes transform categories into meaningful expressions at a higher level of abstraction, the transition from open coding to themes is depicted in figure 3. NVivo was used for coding of all articles, while Rayyan was used to remove duplicates and to categorize the remaining articles as they were reviewed based on reading the abstracts. Linking themes to core contributions is an important part of the reporting process (Tranfield et al., 2003), hence we`ll provide some justification to our thought process as the codes transformed into themes. Jo ur na lP re -p r A common thread in many of the articles was to provide arenas within both the projects and portfolios which would incentivize the sharing of information to address complexity. This was done through contractual setup, culture of collaboration and decision-making, systems and processes, proper front-end loading, stakeholder involvement, risk management, etc. This constitutes most of the theme of proactive disposition together with the cultural aspect. We also found that a difficult balance of set governance to ensure efficiency needed to be combined with sufficient adaptability to accommodate different contexts, stakeholders, etc. While efficiency and legitimacy evolved through the category of governance framework, the aspect of flexibility progressed as a mix of culture, stakeholder management, and competence and competency. Furthermore, the literature focused on the role of top management, both through their activities to ensure strategic alignment, decision-making, etc. but also through their impact on the wider organization, facilitated by their expressed values, behavior, etc. In sum we found this aspect to be a separate theme as a key connection between the portfolio and the organization, but also as an enabler for the other themes. oo f re -p r lP ur na Jo Figure 3: Thematic analysis 4 Analysis and Findings 4.1 Descriptive Analysis The reviewed literature primarily includes articles from the International Journal of Project Management and Project Management Journal, with additional sources listed in Table 2. Although PPM and megaprojects are individually well-covered, literature explicitly addressing portfolios consisting of multiple megaprojects remains scarce. To address this gap, our review incorporates articles focusing separately on PPM or megaprojects, applying a twotier analysis approach (Knopf, 2006). The selected articles range from 2008 to 2024, whereof nearly half of them were published from 2020 onwards. re -p r oo f Table 2: Literature included in the systematic literature review 4.2 Findings Jo ur na lP In this section we will go through findings from the literature. We will present the findings, which in essence address different ways of positively affecting the performance measures of the portfolio, per PPM activity as we defined in the concept introduction. There are two reasons for this, firstly it presents the findings in an objective manner based upon wellestablished PPM literature, secondly it will also provide more insight when reviewing the conceptual framework as we aim to depict how the different PPM activities affect the performance measures of the portfolio. lP re -p r oo f Table 3: Overview of which articles in the systematic literature review that contribute to the different PPM activities Jo ur na 4.2.1 Strategic alignment Strategic alignment ensures that project portfolios directly reflect and support organizational objectives, balancing both immediate and future value creation (Butler, 2022). Concept selection critically impacts strategic success, prompting countries like the UK to introduce formal governance processes prior to concept approval (Volden & Samset, 2017). Studies in the oil and gas industry highlight that proactive stakeholder management during project execution significantly boosts long-term strategic value (Eweje et al., 2012). Similarly, in a European bank, a comprehensive Project Management Office (PMO) framework integrating processes, structures, relations, and values & goals enhanced long-term strategic alignment and stakeholder value (Tsaturyan & Müller, 2015). Further, an analysis of 39 government megaprojects found that aligning projects closely with legislative and organizational strategic goals effectively reduces negative political influence (Patanakul et al., 2016). Moreover, active engagement in diverse megaprojects can inform and evolve an organization's strategic direction, creating new opportunities through internalizing project advancements (Denicol & Davies, 2022). 4.2.2 Portfolio selection & monitoring Portfolio selection, also termed portfolio structuring (Jonas, 2010) involves strategically aligning projects to directly support organizational objectives, thus requiring strong involvement from senior management (Jonas, 2010; Koh & Crawford, 2012; Tsaturyan & Müller, 2015). oo f This includes re-prioritizing both projects and resources in the portfolio. In a study of Norwegian ministries, a weakness that was identified was that some ministries took a passive role in the governance of their projects, even when it came to project selection (Volden & Andersen, 2018). Transparency in this selection process is essential to mitigate biases, such as the development of irrational "pet projects," which can compromise legitimacy and overall strategic effectiveness (Jonas, 2010). However, purely rational project selection may also be insufficient, as it can lead to portfolio imbalances (Butler, 2022). Thus, combining rational methods with a diversity of project types, including explorative projects aimed at long-term innovation and exploitive projects focused on current capabilities, is beneficial for sustained organizational growth (Denicol & Davies, 2022). In owner organizations, like the UK government, several audit reports pointed at the activity of managing the interdependence between the major projects as crucial, and best managed by aligning on an overall strategic vision in the portfolio (Winch & Cha, 2020). Jo ur na lP re -p r In many organizations it is the project portfolio manager who is responsible for monitoring the project portfolio, a task that some label as unreasonable for a portfolio consisting of more than a few projects (Hopmere et al., 2020). For effective oversight, a milestone-driven approach balances the need for flexibility with necessary control, particularly useful in largescale and complex scenarios such as mega-events (Locatelli & Mancini, 2014). According to Jonas (2010) a project portfolio manager is defined as “a central coordination unit that supports the senior management with its specialized knowledge about project portfolio practices”. While sufficient empowerment is emphasized, the interplay with bordering managerial roles should be assessed, as there is great potential for conflict with overlapping or contradicting responsibilities. In the World Expo 2020 programme, it was found that a type of interface that often was neglected by project managers were strategic interfaces, as they often didn`t directly impact project success (Shen & Xue, 2023). This was also echoed in another study where the explanation for the shortcoming was that most project managers attain their expertise by managing smaller projects where the strategic view does not play such a vital role as it does in megaprojects (Eweje et al., 2012). If this is not managed by project managers it must be addressed by someone else as portfolio monitoring needs to ensure strategic alignment (Jonas, 2010). 4.2.3 Resource allocation An organization has finite resources, and a holistic overview is required in order to distribute them timely, transparently, and aligned with strategic priorities and commitments (Butler, 2022). Absence of a holistic approach can have negative impact on the projects in the portfolio. One study found this issue to be a result of long duration of the projects, a lack of synergy, and not having a resource loaded overview contributed to this issue (Cocchiara et al., 2024). Jonas (2010) refers to the term allocation quality when addressing the resource allocation within a project portfolio and highlights its interdependence with access to information and the organization`s ability to act upon it. At the project level it`s found that when information feeds reflect the risk exposure of the project, it positions the project managers to make quality decisions and proactive interventions (Eweje et al., 2012). Several studies found that one-team mindset strengthened efficiency and performance in the projects (Hu et al., 2015; van Marrewijk et al., 2008). Allocating resources within the portfolio has great potential for conflicts as projects compete for the necessary resources to deliver on their objectives (Butler, 2022), while transparency will increase the legitimacy of the process, it still challenges key enablers for megaproject delivery like project culture and trust. oo f 4.2.4 Risk management Risk management at the portfolio level is at a different context than project risk management, hence it is concerned about objectives that are closer to the goals of the overall organization and its strategic initiatives (Butler, 2022). When assessing how a PMO can address complexities, risk management was defined as one of the most important functional capabilities to do so (Ershadi et al., 2022). It was found especially important in relation to multi-project risks which could negatively affect several projects. It is however defined as a less mature field compared to project risk management (Mulambya & Zaaiman, 2021). re -p r During the London Olympics 2012 programme the collaboration model consisted of colocated project teams with members from both the owner’s organization and the contractor, this lead to alignment on the task and challenges and an increased level of trust which made emergent issues transparent early on (Davies & Mackenzie, 2014). ur na lP One study provided insights into how information-feed affected strategic value delivered by megaprojects in the oil and gas industry (Eweje et al., 2012). One finding was that decisionmakers who use more information tend to be more comfortable in dealing with uncertainty and ambiguity, which both are prevalent in megaprojects. Jo 4.2.5 Knowledge management One study found that knowledge was the greatest asset to be managed in Project Based Organizations (PBO) as it transforms into project capabilities (Barbosa & Carvalho, 2023). PPM was seen as the integrator enabling knowledge retainment at the organizational level, transforming it into a sustainable competitive advantage. One case study saw this in practice where the company used exploratory projects to extend the knowledge in the organization (Denicol & Davies, 2022). Project management and knowledge management can be seen as input and output to each other, as relevant knowledge is required to perform good project management, while successful projects contribute to building knowledge in the organization (Cocchiara et al., 2024). A key ability is to transform the acquired knowledge into improved project delivery, also defined as knowledge exploitation (Jonas, 2010). In Room for the River programme in the Netherlands they identified several improvement areas at the PPM level, all of which contributed positively towards mutual trust between the stakeholders (Rijke et al., 2014). Another example is the World Expo in China, where a governance model for such a megaevent was already in place following the learnings from similar mega-events (Li et al., 2018). Sharing of explicit knowledge is easy as it can be coded, documented and made available through the use of different tools to the wider organization (Cocchiara et al., 2024), and PPM clearly holds a strong position to facilitate this process. It is however the tacit knowledge that holds greater potential to create a competitive advantage for the businesses (Sanz & OrtizMarcos, 2019). Tacit knowledge is challenging to share as it is generated through individual experiences and is difficult to express and extract. One approach to sharing tacit knowledge is to actively distribute resources. In one company key leaders from a successful megaproject were distributed into the delivery of London Olympics 2012 (Denicol & Davies, 2022). While this benefitted this project, the wider portfolio did not benefit until after the finalization of the project. A key takeaway was that for a portfolio of megaprojects, with long-time spans, knowledge integration should be a continuous process rather than an activity that takes place at the end of the project. re -p r oo f An alternative is that rather than moving resources in between different projects one can dedicate resources to specific project phases, that way they would become specialized in a specific phase in addition to capture and share learnings between the projects (Cocchiara et al., 2024). In a study that assessed how PMO`s could address complexity it was determined that knowledge sharing between multidisciplinary team members enhanced their coordination to manage interfaces, and thereby mitigating complexity (Ershadi et al., 2022). ur na lP According to Duryan and Smyth (2019), Communities of Practice (CoP) is an approach which can provide hierarchical PBO`s with flexibility through organizational learning. This approach is, however, dependent on senior management support and guidance to be effective. Eikelenboom and van Marrewijk (2024) also pointed at the role that senior management and the parent organization plays in relation to enabling knowledge sharing from the projects. Jo A study found that communication skills were important for transfer of know-how knowledge, but the most decisive factor was trust (Sanz & Ortiz-Marcos, 2019). The key to strengthening these factors was found to be periodic face-to-face interaction between the remote teams. The barriers found also seemed to be more dependent on project characteristics than industry, as similar findings were reported within other industries like Oil & Gas. 4.2.6 Portfolio communication In a case study of the Shanghai Expo construction in China, the importance of communication was ranked as a top three factor in relation to managing their program (Hu et al., 2015). The client focused on regular cross-functional communication activities, and experienced improved efficiency through increased motivational capability, and ability to address complexity. The Hoover Dam megaproject is well-known. While the health & safety performance of more than 1000 deaths on site obviously would be unacceptable today, there are other experiences to investigate (Kwak et al., 2014). The project had a very close collaboration between the contractor and the governmental agencies who followed up the project, leading to joint efforts to overcome technical and operational challenges. A key factor to accommodate complexity through PPM was found to be improved coordination. The coordination especially addresses the organizational and environmental complexity (Ershadi et al., 2022). An obstacle to coordination across the portfolio can be the lack of a common taxonomy. In a study of two space missions, which were run in parallel, but using different naming conventions (Cocchiara et al., 2024). This made sharing of knowledge difficult, and this effect will be carried along into the operational phase where operational procedures etc. differ and further complicates the use of staff across missions. lP re -p r oo f 4.2.7 Portfolio governance When assessing owner challenges in the UK, project governance received the second highest score, only surpassed by the category technology and systems (Winch & Cha, 2020). The study stressed the importance of a governance model which would aid in addressing interdependence, clarifying roles and responsibilities, as well as leadership and decisionmaking. These findings were echoed in a review of 39 public projects in the US, UK and Australia, where most of the projects struggled with control and oversight, and proposed better use of project management processes and empowering the project owners to fulfil their role properly (Patanakul et al., 2016). Another study reviewed how six different countries performed governance of major projects. The authors found two essentially different approaches: governance through projects, and governance of projects. While the former focused on doing the individual projects efficiently, the latter focused more on the portfolio view and had as a result established functions at the portfolio level (Volden & Samset, 2017). A commonality found among most of the countries was that the focus on the front-end stage of the projects was strengthened as the organizations matured, giving more weight to the strategic premises and not only project efficiency. Jo ur na Brunet (2021) found that the governance structure had three central objectives at different levels in the organization. At the project level the objective was efficiency, at the portfolio level, it was accountability, and lastly at the institutional level it was legitimacy. The challenge is to find the balance between these three levels, as their objectives often lack alignment. An aspect to address complexity in the 2012 London Olympics programme was flexibility in the project organization to deal with emergent events that could not have been foreseen in advance. Credit for this flexibility was partly given by project members to the contractual setup which enabled tight collaboration and the required transparency to be able to detect emerging issues at an early stage (Davies & Mackenzie, 2014). Another study of a megaevent, the World Expo 2010 in China, also concluded that project governance continuously needs to evolve in line with the project during the entire life cycle to ensure sufficient capabilities within adaptability and resilience to be positioned to deliver on the defined vision and goals (Li et al., 2018). The lack of competency can be an obstacle to obtaining this adaptability; in the case study of a large European bank, it was found that they recruited project managers internally, as they valued established network within the company higher than specialized project management competency. An effect of this approach was that the project managers were more reliant on following rules and regulations to deliver projects, and less flexible than more experienced project managers would have been (Tsaturyan & Müller, 2015). As the project context affects governance, Brunet et al. (2023) proposes that sensemaking and relational mechanisms are used to decide upon which processes and governance structure to adhere to in the project. In other words, alignment on culture, vision, and collaboration is seen as more fitting to decide governance structures than contracts and formal processes. 5 Conceptual Framework The conceptual framework (Figure 4) and Figure 5 visually represents how key PPM activities impact megaproject portfolio success, structured through three key themes: Proactive Disposition, Flexible Governance, and C-suite Advocacy. Although interconnected, each theme distinctly contributes to specific aspects of portfolio success. oo f Resource allocation illustrates a mixed impact; reallocating resources can strengthen strategic or knowledge transfer benefits across the portfolio but may negatively affect individual projects experiencing resource reduction. lP re -p r The proposed framework aligns closely with Unger et al.’s (2012) roles within a PMO. Specifically, C-suite Advocacy corresponds to the coordinator role, emphasizing strategic alignment and stakeholder collaboration. Proactive disposition aligns with the controlling role, which provides timely information to support strategic decision-making. Lastly, flexible governance reflects the supporting role, facilitating effective methodologies and knowledgesharing practices. Jo ur na While we see similarities with our framework, we do present a more specific and granular insight into how a portfolio of megaprojects is improved through PPM activities, and its connection to portfolio success. Unger et al. (2012) also called for research which explored many different contexts, which we indeed have addressed. By depicting which drivers that come into play across the different PPM activities to affect portfolio success, we draw a clearer picture of how different efforts affect performance outcomes. Our framework further alleviates the activity-based focus by a strengthened attention to outcomes, a model better suited to accommodate the complexity of megaproject portfolios. oo f re -p r lP Jo ur na Figure 4: Framework displaying how PPM activities influence portfolio success measures Figure 5: Supplement to the conceptual framework, providing reasoning behind how each theme contributes to the success measures per PPM activity 6 Discussion “Determining a code for emergent themes from the data can be more art than science” (Williams & Moser, 2019) a sentiment we endorse. While other themes could also reflect the literature, our selection—Proactive Disposition, Flexible Governance, and C-suite Advocacy—was guided by their conceptual weight and relevance. These interconnected yet distinct themes represent core dimensions of effective megaproject portfolio management: leadership, adaptability, and proactivity. Together, they capture the cultural and strategic foundations needed to navigate the complexity inherent in megaprojects. The following sections elaborate on each theme in relation to the research question. 6.1 Proactive disposition lP re -p r oo f Bateman and Crant (1993) wrote about how some individuals had a proactive disposition to actively create environmental change, we argue that the construct of having a proactive disposition is beneficial in relation to managing a portfolio of megaprojects as the ability and importance of mitigating uncertainty is more vital than for smaller projects. The objectives of megaprojects are more strategic and long-term, this profoundly affects how the projects needs to be managed; as an example we`ve seen increased focus on front-end loading for megaprojects (Brunet et al., 2023; Kwak et al., 2014; Thiel & Grabher, 2023; Volden & Andersen, 2018; Volden & Samset, 2017) to ensure alignment with business strategy, customer expectations, and overall mitigation of uncertainty. Jo ur na Knowledge is a powerful tool which underpins proactivity at its core by learning from previous experience and sharing it across the portfolio of projects. PPM plays a crucial role in facilitating this activity and acts as a repository of knowledge which should be managed as an enabler for fulfillment of the organizational strategy. Timely information is key, and for megaprojects the knowledge needs to be shared continually to achieve full effect across the portfolio, given their long-term duration (Denicol & Davies, 2022). Managers of megaprojects who consistently use quality information through established risk management processes are better positioned to make value-creating decisions in the project (Eweje et al., 2012). By having close collaboration with partners and contractors, the threshold for communication is lowered, and in turn the projects get access to timely information to address several forms of complexity (Davies & Mackenzie, 2014; Eweje et al., 2012). Several of the case studies highlighted this aspect of megaprojects, and Denicol & Davies (2022) even argued that a natural evolution of megaprojects is that they should be managed as fully integrated teams between clients and delivery partners. While the project design is important, it needs to be supplemented with a culture that facilitates collaboration (van Marrewijk et al., 2008), and our statement is that a proactive disposition needs to be engrained in this culture to be best positioned for megaproject portfolio success. As can be seen in figure 4 we find that this theme is most prominent in the operational performance of individual projects and the portfolio. It does however also enable strategic decision-making by top management through relevant and timely information. 6.2 Flexible governance The standard for portfolio management (Project Management, 2017) emphasizes the importance of evaluating and determining the key components of a portfolio, as they affect how portfolio governance should be performed. Megaprojects certainly bring aspects that need to be accommodated in the governance design. re -p r oo f Uncertainty is a challenge for governance models to accommodate, but when adding flexibility, we provide the resilience that is required. In Room for the River programme, adaptation to regional context was required at the project level. Additionally, the PMO provided the identification of early warning signals across the portfolio, and the knowledge management capability to coordinate learnings to mitigate them. All of which were enabled through a flexible and adaptable governance design from the start of the programme (Rijke et al., 2014). This resonates well with the findings of Muller et al. (2014) who found that while flexibility is important for successful governance, the requirements differ at the different levels of the organization. At the lower levels, like the individual projects in Room for the River programme, the flexibility needed was to adjust methods and processes to fit the project. At the higher levels flexibility needs to address cultural aspects of the organization, as the forementioned programme achieved through knowledge sharing across the different projects. ur na lP We also find this theme to be mainly concerned with the operational performance of individual projects and the portfolio, perhaps not surprising as it provides the framework for the given context to achieve efficiency and effectiveness. While we have chosen not to emphasize a substantial impact on the formation of strategy, it does provide legitimacy to the strategic decisions made by the c-suite. Jo 6.3 C-Suite advocacy Top management involvement has a positive impact on portfolio management through ensuring strategic fit, and their ability to terminate projects which do not contribute to the strategy of the organization (Martinsuo, 2013), too much involvement however can generate negative effects. One example is the nurturing of so called “pet projects”, where top management support goes beyond rationality (Jonas, 2010). Top management are best positioned to ensure strategic fit and portfolio balance. As the project portfolio implements the organizational strategy it’s imperative that the C-suite takes the reins, by taking ownership in making sure the portfolio enables the overall strategy. This is what Kopmann et al. (2017) defines as deliberate strategy implementation which is seen as a pre-requisite to PPM success. The other pre-requisite mentioned is emergent strategy recognition, which we saw exemplified where explorative projects were used to widen the scope and future competitiveness of the company by providing input to their company strategy formulation (Denicol & Davies, 2022). Taking the reins means establishing the governance framework of which will deliver the project portfolio (Volden & Andersen, 2018), play an active role in strategic fit and balancing the portfolio while adhering to their own governance regulations to ensure legitimacy (Jonas, 2010), ensure sufficient resources and nurture a proactive culture by ensuring psychological safety through their own behavior. Top management also plays a crucial role in enabling cross-functional knowledge arenas like Communities of Practice to function efficiently in hierarchical organizations (Duryan & Smyth, 2019), and to provide support to knowledge sharing by using their holistic overview of the organization to aid the projects in learning from each other (Eikelenboom & van Marrewijk, 2024). It`s also found that top management rhetoric comes short to expressed preferences and values (Eweje et al., 2012), hence walk-the-walk is the more efficient approach to affect the organization. In contrast to the other two themes the top management involvement impacts more evenly on the different success measures. It’s however important to keep in mind the interdependent relationship between them, and C-suite advocacy is a key enabler for the other two themes to generate value. oo f 7 Conclusion and Recommendations ur na lP re -p r The overarching topic of megaprojects, and particularly a portfolio of them, requiring resilience is indeed a critical observation from this study. The three drivers for success identified in the study - proactive disposition, flexible governance, and C-suite advocacy strengthen the focus within established PPM activities towards being better positioned to deal with the uncertainty inherent in megaprojects. By fostering a proactive culture that encourages collaboration and timely information sharing, implementing a flexible governance model designed to make challenges transparent while navigating changing contexts, and ensuring that top management provides strategic steering while enabling the culture and governance, organizations can enhance their chances of achieving portfolio success for their megaprojects. Jo It is crucial to acknowledge that this specific area of megaproject portfolio management is under-researched, despite its high relevance for project practitioners. The novel conceptual framework presented in this study aims to contribute to the further expansion of expertise through empirical research, ultimately aiding megaproject portfolios worldwide to effectively support their organizations' strategies, which undoubtedly also will benefit society at large as megaprojects are essential for urban and regional development globally. The framework links key PPM activities to portfolio success measures via the three forementioned critical drivers. These drivers are grounded in the specific characteristics and complexities of megaprojects and serve as actionable focal points for improving portfoliolevel outcomes. Recommendations derived from the framework include: Establishing context-sensitive governance structures that recognize the distinct nature of megaproject portfolios and provide both control and flexibility. Identifying and addressing gaps in areas like stakeholder alignment, risk management, and strategic integration. Fostering a collaborative culture that enables knowledge sharing and proactive issue resolution across projects. Clarifying the expected role of senior leadership, emphasizing their influence on strategic alignment and organizational readiness. Promoting a portfolio-level perspective that is often overshadowed by the dominance of project-centric management in megaproject environments, and lastly to use the three critical drivers to focus more on outcomes rather than activities. In sum, the value of the framework lies in offering a conceptual lens and practical guidance for enhancing the governance, alignment, and effectiveness of megaproject portfolios—an area currently underexplored in the literature. However, the framework's reliance on thematic analysis introduces a degree of subjectivity that could influence the identification and interpretation of themes. Additionally, the number of articles specifically addressing PPM in the context of megaproject portfolios might raise concerns about the comprehensiveness of the literature review. Therefore, future research should prioritize: ▪ oo f ▪ Empirical validation of the framework in real-world settings to solidify its practical relevance. Longitudinal case studies would be particularly valuable for tracking the framework's effectiveness over time. Investigating the impact of PPM activities on individual megaproject success, enhancing the framework's granularity and providing more targeted guidance. Developing Key Performance Indicators (KPIs) based on the framework to facilitate ongoing monitoring and evaluation. re -p r ▪ Jo ur na lP By pursuing these research avenues, the field can move beyond theoretical frameworks and contribute to the development of evidence-based practices for effective megaproject portfolio management. This will ultimately empower organizations to better navigate the complexities of megaproject portfolios and achieve their strategic objectives. 8 References Jo ur na lP re -p r oo f Alavi, M., & Leidner, D. E. (2001). Review: Knowledge Management and Knowledge Management Systems: Conceptual Foundations and Research Issues. MIS Quarterly, 25(1), 107-136. https://doi.org/10.2307/3250961 Barbosa, M. T. J., & Carvalho, M. M. (2023). Toward a Multilevel Framework of Dynamic Capabilities Through the Lens of Project Management, Project Portfolio Management, and Project-Based Organizations. Project Management Journal, 55(3). https://doi.org/10.1177/87569728231207028 Bateman, T. S., & Crant, J. M. (1993). The proactive component of organizational behavior: A measure and correlates. Journal of organizational behavior, 14(2), 103-118. Blichfeldt, B. S., & Eskerod, P. (2008). Project portfolio management – There’s more to it than what management enacts. International Journal of Project Management, 26(4), 357365. https://doi.org/https://doi.org/10.1016/j.ijproman.2007.06.004 Brookes, N. J., & Locatelli, G. (2015). Power plants as megaprojects: Using empirics to shape policy, planning, and construction management. Utilities Policy, 36, 57-66. https://doi.org/https://doi.org/10.1016/j.jup.2015.09.005 Brunet, M. (2021). Making sense of a governance framework for megaprojects: The challenge of finding equilibrium. International Journal of Project Management, 39(4), 406-416. https://doi.org/10.1016/J.IJPROMAN.2020.09.001 Brunet, M., Petit, M.-C., & Romero-Torres, A. (2023). Interorganizational Design for Collaborative Governance in Co-Owned Major Projects: An Engaged Scholarship Approach. Project Management Journal. https://doi.org/10.1177/87569728231208853 Burke, C., & Abuljadayel, F. (2024). Saudi Arabia's Vision 2030 Projects Reach $1.3 Trillion in Value [Article]. Bloomberg.com, N.PAG-N.PAG. https://search.ebscohost.com/login.aspx?direct=true&db=bth&AN=179551584&site= ehost-live Butler, M. J. (2022). Project portfolio management practices - a theoretical base and practitioner guidelines. International Journal of Project Organisation and Management, 14(1). https://doi.org/10.1504/IJPOM.2022.10045708 Cocchiara, C. M., Nigro, G. L., Roma, P., & Ragusa, A. (2024). Project and knowledge management at European public space agencies: The need for a three-dimensional project management office. Space policy. https://doi.org/10.1016/J.SPACEPOL.2024.101639 Cooke-Davies, T. (2002). The “real” success factors on projects. International Journal of Project Management, 20(3), 185-190. https://doi.org/https://doi.org/10.1016/S02637863(01)00067-9 Cooper, R. G., Edgett, S. J., & Kleinschmidt, E. J. (1997). Portfolio Management in New Product Development: Lessons from the Leaders—I. Research-Technology Management, 40(5), 16-28. https://doi.org/10.1080/08956308.1997.11671152 Cooper, R. G., Edgett, S. J., & Kleinschmidt, E. J. (2002). Portfolio management: fundamental to new product success. The PDMA toolbook for new product development, 1, 331364. Davies, A., & Mackenzie, I. (2014). Project Complexity and Systems Integration: Constructing the London 2012 Olympics and Paralympics Games. International Journal of Project Management, 32(5), 773-790. https://doi.org/10.1016/J.IJPROMAN.2013.10.004 Jo ur na lP re -p r oo f Denicol, J., & Davies, A. (2022). The Megaproject-based Firm: Building programme management capability to deliver megaprojects. International Journal of Project Management, 40(5). https://doi.org/10.1016/J.IJPROMAN.2022.06.002 Dictionary, O. E. (2023). mega, adv. & adj. In Oxford English Dictionary. Retrieved 28.10.2024, from https://www.oed.com/dictionary/mega_adv?tab=meaning_and_use Duryan, M., & Smyth, H. (2019). Cultivating sustainable communities of practice within hierarchical bureaucracies: The crucial role of an executive sponsorship. International Journal of Managing Projects in Business. https://doi.org/10.1108/IJMPB-03-20180040 Eikelenboom, M., & van Marrewijk, A. (2024). Tied islands: the role of organizational members in knowledge transfer across strategic projects. International Journal of Project Management, 42(3). https://doi.org/10.1016/J.IJPROMAN.2024.102590 Ershadi, M., Jefferies, M., Davis, P. R., & Mojtahedi, M. (2022). The contribution of project management offices to addressing complexities in principal construction contracting. Engineering, Construction and Architectural Management, 29(1), 287-306. https://doi.org/10.1108/ECAM-04-2020-0244 Ewald, H., Klerings, I., Wagner, G., Heise, T. L., Stratil, J. M., Lhachimi, S. K., Hemkens, L. G., Gartlehner, G., Armijo-Olivo, S., & Nussbaumer-Streit, B. (2022). Searching two or more databases decreased the risk of missing relevant studies: a metaresearch study. Journal of Clinical Epidemiology, 149, 154-164. https://doi.org/https://doi.org/10.1016/j.jclinepi.2022.05.022 Eweje, J., Turner, J. R., & Müller, R. (2012). Maximizing strategic value from megaprojects: The influence of information-feed on decision-making by the project manager. International Journal of Project Management, 30(6), 639-651. https://doi.org/10.1016/J.IJPROMAN.2012.01.004 Flyvbjerg, B. (2014). What you Should Know about Megaprojects and Why: An Overview. Project Management Journal, 45(2), 6-19. https://doi.org/10.1002/pmj.21409 Flyvbjerg, B., Skamris holm, M. K., & Buhl, S. L. (2003). How common and how large are cost overruns in transport infrastructure projects? Transport Reviews, 23(1), 71-88. https://doi.org/10.1080/01441640309904 Flyvbjerg, B., Stewart, A., & Budzier, A. (2016). The Oxford Olympics Study 2016: Cost and Cost Overrun at the Games. Strategy & Microeconomic Policy eJournal. Grant, M. J., & Booth, A. (2009). A typology of reviews: an analysis of 14 review types and associated methodologies. Health information & libraries journal, 26(2), 91-108. Hopmere, M., Crawford, L., & Harré, M. (2020). Proactively Monitoring Large Project Portfolios. Project Management Journal, 51(6). https://doi.org/10.1177/8756972820933446 Hu, Y., Chan, A., & Le, Y. (2015). Understanding the Determinants of Program Organization for Construction Megaproject Success: Case Study of the Shanghai Expo Construction. Journal of Management in Engineering, 31(5). https://doi.org/10.1061/(ASCE)ME.1943-5479.0000310 Jonas, D. (2010). Empowering project portfolio managers: How management involvement impacts project portfolio management performance. International Journal of Project Management, 28(8), 818-831. https://doi.org/10.1016/J.IJPROMAN.2010.07.002 Kaiser, M. G., Arbi, F. E., & Ahlemann, F. (2015). Successful project portfolio management beyond project selection techniques: Understanding the role of structural alignment. re -p r Megaprojects for Megacities. Edward Elgar Publishing. https://doi.org/10.4337/9781803920634 oo f International Journal of Project Management, 33(1), 126-139. https://doi.org/10.1016/J.IJPROMAN.2014.03.002 Killen, C. P., Hunt, R. A., & Kleinschmidt, E. J. (2008). Learning investments and organizational capabilities: Case studies on the development of project portfolio management capabilities. International Journal of Managing Projects in Business, 1(3), 334-351. Knopf, J. W. (2006). Doing a literature review. PS: Political Science & Politics, 39(1), 127-132. Koh, A., & Crawford, L. (2012). Portfolio Management: The Australian Experience. Project Management Journal, 43(6), 33-42. https://doi.org/10.1002/PMJ.21300 Kopmann, J., Kock, A., Killen, C. P., & Gemünden, H. G. (2017). The role of project portfolio management in fostering both deliberate and emergent strategy. International Journal of Project Management, 35(4), 557-570. Kwak, Y. H., Walewski, J., Sleeper, D. M., & Sadatsafavi, H. (2014). What can we learn from the Hoover Dam project that influenced modern project management. International Journal of Project Management, 32(2), 256-264. https://doi.org/10.1016/J.IJPROMAN.2013.04.002 Landis, J., & D. Landis, J. (2022). Megaprojects for Megacities: A Comparative Casebook Jo ur na lP 10.4337/9781803920634.00017 Li, Y., Lu, Y., Ma, L., & Kwak, Y. (2018). Evolutionary Governance for Mega-Event Projects (Meps): A Case Study of the World Expo 2010 in China. Project Management Journal, 49(1). https://journals.sagepub.com/doi/epdf/10.1177/875697281804900105 Locatelli, G., & Mancini, M. (2014). Controlling the delivering of projects in mega-events: An application on EXPO 2015. Event Management, 18(3), 285-301. https://doi.org/10.3727/152599514X13989500765763 Martinsuo, M. (2013). Project portfolio management in practice and in context. International Journal of Project Management, 31(6), 794-803. Meskendahl, S. (2010). The influence of business strategy on project portfolio management and its success—A conceptual framework. International Journal of Project Management, 28(8), 807-817. Mulambya, E., & Zaaiman, H. (2021). A literature- and senior stakeholder-informed model of southern African programme risk management challenges. African Journal of Science, Technology, Innovation and Development, 14(5). https://doi.org/10.1080/20421338.2021.1947175 Müller, R., Martinsuo, M., & Blomquist, T. (2008). Project portfolio control and portfolio management performance in different contexts. Project Management Journal, 39(3), 28-42. Müller, R., Pemsel, S., & Shao, J. (2014). Organizational enablers for governance and governmentality of projects: A literature review. International Journal of Project Management, 32(8), 1309-1320. https://doi.org/https://doi.org/10.1016/j.ijproman.2014.03.007 Nowell, L. S., Norris, J. M., White, D. E., & Moules, N. J. (2017). Thematic Analysis:Striving to Meet the Trustworthiness Criteria. International Journal of Qualitative Methods, 16(1), 1609406917733847. https://doi.org/10.1177/1609406917733847 Pajares, J., & López, A. (2014). New Methodological Approaches to Project Portfolio Management: The Role of Interactions within Projects and Portfolios. Procedia - Social Jo ur na lP re -p r oo f and Behavioral Sciences, 119, 645-652. https://doi.org/https://doi.org/10.1016/j.sbspro.2014.03.072 Patanakul, P., Kwak, Y. H., Zwikael, O., & Liu, M. (2016). What impacts the performance of large-scale government projects? International Journal of Project Management, 34(3), 452-466. https://doi.org/10.1016/J.IJPROMAN.2015.12.001 PMI. (2021). A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Seventh Edition and The Standard for Project Management (ENGLISH) (Vol. Seventh edition) [Book]. Project Management Institute. https://search.ebscohost.com/login.aspx?direct=true&db=nlebk&AN=2942429&site= ehost-live&scope=site Pollack, J., Biesenthal, C., Sankaran, S., & Clegg, S. (2018). Classics in megaproject management: A structured analysis of three major works. International Journal of Project Management, 36(2), 372-384. https://doi.org/https://doi.org/10.1016/j.ijproman.2017.01.003 Project Management, I. (2017). The Standard for Portfolio Management (Vol. Fourth Edition) [Book]. Project Management Institute. https://search.ebscohost.com/login.aspx?direct=true&db=nlebk&AN=1640653&site= ehost-live&scope=site Rijke, J., van Herk, S., Zevenbergen, C., Ashley, R., Hertogh, M., & Heuvelhof, E. t. (2014). Adaptive programme management through a balanced performance/strategy oriented focus. International Journal of Project Management, 32(7), 1197-1209. https://doi.org/10.1016/J.IJPROMAN.2014.01.003 Sanz, M. M. M., & Ortiz-Marcos, I. (2019). Dimensions of knowledge governance in a multiPMO project context. International Journal of Managing Projects in Business. https://doi.org/10.1108/IJMPB-11-2018-0244 Shen, W., & Xue, J. (2023). Managing project-to-project interfaces for large-scale programmes: A network study in world expo 2020. International Journal of Project Management, 41(2). https://doi.org/10.1016/J.IJPROMAN.2023.102438 Sovacool, B. K., Gilbert, A., & Nugent, D. (2014). An international comparative assessment of construction cost overruns for electricity infrastructure. Energy Research & Social Science, 3, 152-160. https://doi.org/https://doi.org/10.1016/j.erss.2014.07.016 Teller, J., & Kock, A. (2013). An empirical investigation on how portfolio risk management influences project portfolio success. International Journal of Project Management, 31(6), 817-829. https://doi.org/https://doi.org/10.1016/j.ijproman.2012.11.012 Thiel, J., & Grabher, G. (2023). Abolish, Accept, Apply: Coping With Ignorance in Project Ecologies. Project Management Journal, 55(2). https://doi.org/10.1177/87569728231179812 Tranfield, D., Denyer, D., & Smart, P. (2003). Towards a methodology for developing evidence‐ informed management knowledge by means of systematic review. British journal of management, 14(3), 207-222. Tsaturyan, T., & Müller, R. (2015). Integration and governance of multiple project management offices (PMOs) at large organizations. International Journal of Project Management, 33(5), 1098-1110. https://doi.org/10.1016/J.IJPROMAN.2015.01.003 Unger, B. N., Gemünden, H. G., & Aubry, M. (2012). The three roles of a project portfolio management office: Their impact on portfolio management execution and success. International Journal of Project Management, 30(5), 608-620. https://doi.org/https://doi.org/10.1016/j.ijproman.2012.01.015 Jo ur na lP re -p r oo f USGOA. (2024). Report to Congressional committees: NASA - Assessments of Major Projects. Retrieved from https://www.gao.gov/assets/gao-24-106767.pdf van Marrewijk, A., Clegg, S., Pitsis, T. S., & Veenswijk, M. (2008). Managing public–private megaprojects: Paradoxes, complexity, and project design. International Journal of Project Management, 26(6), 591-600. https://doi.org/10.1016/J.IJPROMAN.2007.09.007 Volden, G. H., & Andersen, B. (2018). The hierarchy of public project governance frameworks: An empirical study of principles and practices in Norwegian ministries and agencies. International Journal of Managing Projects in Business, 11(1), 174-197. https://doi.org/10.1108/IJMPB-04-2017-0040 Volden, G. H., & Samset, K. (2017). Governance of Major Public Investment Projects: Principles and Practices in Six Countries. Project Management Journal, 48(3), 90-108. https://doi.org/10.1177/875697281704800306 Williams, M., & Moser, T. (2019). The art of coding and thematic exploration in qualitative research. International management review, 15(1), 45-55. Winch, G., & Cha, J. (2020). Owner challenges on major projects: The case of UK government. International Journal of Project Management, 38(3), 177-187. https://doi.org/10.1016/J.IJPROMAN.2020.03.001 Xiao, Y., & Watson, M. (2019). Guidance on conducting a systematic literature review. Journal of planning education and research, 39(1), 93-112. 2023 2021 2023 2022 2021 2024 2014 2019 2022 2019 2024 2022 2012 2014 2020 2020 2015 2016 2010 2015 2021 2012 2014 2018 2022 2014 2021 2016 2014 Project Management Journal International Journal of Project Management Project Management Journal International Journal of Project Organisation and Management Project Management Journal Space Policy International Journal of Project Management International Journal of Project Organisation and Management International Journal of Project Management International Journal of Managing Projects in Business International Journal of Project Management Engineering, Construction and Architectural Management International Journal of Project Management The Journal of Modern Project Management Project Management Journal Project Management Journal Journal of Management in Engineering Journal of Management in Engineering International Journal of Project Management International Journal of Project Management The Journal of Modern Project Management Project Management Journal International Journal of Project Management Project Management Journal Journal of Construction Engineering and Management Event Management African Journal of Science, Technology, Innovation and Development International Journal of Project Management International Journal of Project Management na lP re -p ro of Journal Jo Barbosa, Marcos T.J.; Carvalho, Marly M. Brunet, Maude. Brunet, Maude; Petit, Marie-Claude; Romero-Torres, Alejandro Butler, Martin J. Chenger, Denise; Woiceshyn, Jaana Cocchiara, Chiara Maria; Nigro, Giovanna Lo; Roma, Paolo; Ragusa, Antonio Davies, Andrew; Mackenzie, Ian Delphine,; Prakoso, Yudhi Timor Bimo; Witte, Patrick; Spit, Tejo Denicol, Juliano; Davies, Andrew Duryan, Meri; Smyth, Hedley Eikelenboom, M.; van Marrewijk, A. Ershadi, Mahmoud; Jefferies, Marcus; Davis, Peter Rex; Mojtahedi, Mohammad Eweje, John; Turner, J. Rodney; Müller, Ralf Grönevall, Richard; Danilovic, Mike Guo, Ning-sheng; Guo, P.; Madhavan, Ravi; Zhao, Jingrui; Liu, Yang Hopmere, Michael; Crawford, L.; Harré, M Hu, Yi; Chan, A.; Le, Y. Hu, Yi; Chan, A.; Le, Y.; Xu, Yelin; Shan, M. Jonas, Daniel Kaiser, Michael G.; Arbi, Fedi El; Ahlemann, Frederik Kannan, Selvi; Adebayo, Olanrewaju Koh, Aileen; Crawford, L. Kwak, Young Hoon; Walewski, John; Sleeper, Dana Marie; Sadatsafavi, Hessam Li, Yongkui; Lu, Yujie; Ma, Liang; Kwak, Y. Liu, Mingqiang; Zhu, Yongsong; Wei, Jianjun; Le, Y.; Zhang, Xinyue Locatelli, Giorgio; Mancini, Mauro Mulambya, Emmanuel; Zaaiman, H. Patanakul, Peerasit; Kwak, Young Hoon; Zwikael, Ofer; Liu, Min Rijke, Jeroen; van Herk, Sebastiaan; Zevenbergen, Chris; Ashley, Richard; Hertogh, Marcel; Heuvelhof, Ernst ten Sanz, Maria Mercedes Martinez; Ortiz-Marcos, l. Shen, Wenxin; Xue, Jin Thiel, Joachim; Grabher, Gernot Year ur Authors 2019 2023 2023 International Journal of Managing Projects in Business International Journal of Project Management Project Management Journal Citations* 8 59 9 2 18 0 376 1 33 45 5 7 333 11 18 26 88 118 410 365 1 47 93 58 5 23 3 206 112 34 5 2 Tsaturyan, Tamara; Müller, Ralf van Marrewijk, Alfons; Clegg, Stewart; Pitsis, Tyrone S.; Veenswijk, Marcel Volden, Gro Holst; Andersen, B. Volden, Gro Holst; Samset, K. Winch, Graham; Cha, Jonghyuk 2015 2008 2018 2017 2020 International Journal of Project Management International Journal of Project Management International Journal of Managing Projects in Business Project Management Journal International Journal of Project Management Jo ur na lP re -p ro of *source: scholar.google.com 30/11/2024 112 756 61 80 47 Strategic alignment Barbosa & Carvalho, 2023 Portfolio selection & monitoring Resource allocation x x Risk management Knowledge management Portfolio communication x Brunet, 2021 x x x x x x x x x x x x x x x x x x x x x Brunet et al., 2023 Butler, 2022 x x x x x x x Chenger & Woiceshyn, 2021 Cocchiara, 2024 x x Duryan & Smyth, 2019 x Grönevall & Danilovic, 2014 Guo et al., 2020 Hopmere & Crawford, 2020 Jo ur na Eweje et al., 2012 lP Eikelenboom & van Marrewijk, 2024 Ershadi et al., 2022 ro x re -p Denicol & Davies, 2022 x x of Davies & Mackenzie, 2014 Delphine et al., 2019 x x x x Hu et al., 2015 x x x x x x x x x x x x x x Hu et al., 2016 Jonas, 2010 Kaiser, 2015 x x Kannan & Adebayo, 2021 Koh & Crawford, 2012 x x x x x x Portfolio governance x x x Kwak et al., 2014 x Li et al., 2018 x Liu et al., 2022 Locatelli & Mancini, 2014 x Mulambya & Zaaiman, 2021 Patanakul et al., 2016 Rijke et al., 2014 x x x x x x x x ro x van Marrewijk et al., 2008 Volden & Andersen, 2018 Volden & Samset, 2017 Winch & Chia, 2020 x x x x x x x x lP x Jo ur na Tsaturyan & Müller, 2015 re -p Thiel & Grabher, 2023 x x x x x of Sanz & Ortiz-Marcos, 2019 Shen & xue, 2023 x x x x x x x x x x x Highlights: oo f re -p r lP ur na • • • Portfolios of megaprojects have distinct features that need to be accommodated The suggested framework accommodates the unique features of megaproject portfolios. Sufficient resilience is enabled through close collaboration with key stakeholders Portfolio success requires active involvement from top management Focus on outcomes rather than activities better accommodates complexity Jo • • Thomas Tepstad Berge Thomas Tepstad Berge is a PhD Candidate of Project Management at the Norwegian University of Science and Technology (NTNU). He has 15 years of experience as a practitioner of project management within the Oil and Gas industry, spanning from front-end to execution within both brownfield and greenfield developments. oo f Bassam Hussein Jo ur na lP re -p r Bassam Hussein is a Professor of Project Management at the Norwegian University of Science and Technology (NTNU), where he has been a leading educator and researcher for over 25 years. He has authored or coauthored more than 80 publications in the field of project management. His research interests span a range of critical areas, including project success, project complexity, innovative learning, agile development, digital transformations, and organizational learning. In recognition of his excellence in teaching, he was named one of Norway’s top ten lecturers by the Morgenbladet newspaper in 2016. In 2023, he was further honored with the status of Excellent Teaching Practitioner at NTNU, reflecting his continued commitment to fostering innovative learning environments and advancing the discipline of project management. Haavard Haaskjold Haavard Haaskjold has a PhD degree within project management from the Norwegian University of Science and Technology (NTNU). Haaskjold currently holds a position as Associate Professor in Project Management at NTNU. He is a certified Project Management Professional (PMP) from the Project Management Institute and is also a reviewer for several international journals. He has 15 years of experience as a practitioner of project management. Declaration of interests ☐ The authors declare that they have no known competing financial interests or personal relationships that could have appeared to influence the work reported in this paper. ☒ The authors declare the following financial interests/personal relationships which may be considered as potential competing interests: Jo ur na lP re -p ro of Thomas Tepstad Berge reports financial support was provided by Aker BP ASA. If there are other authors, they declare that they have no known competing financial interests or personal relationships that could have appeared to influence the work reported in this paper.
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )