IN A WORLD FULL OF DECEIVER KEEP YOUR
ANOINTING
(1 John 2:18-29)
Introduction:
● We are in the last days and we see all the signs that Jesus is coming back.
● There are many calamities happen for the past few days.
● There are many wars in other country, recently there was a war between
Thailand and Cambodia because of the borders conflict and it result to the
death of 34 people(July 24,2025?
● The devil will deceive you no matter what, some people will be used to
deceive you that’s why we need to be aware and vigilant to those things.
● But don’t worry, God is within us and He will not let the enemy to destroy us,
instead He will protect us.
*vs. 18-19
* vs. 27 HOW TO KEEP THE ANOINTING?
I. ALWAYS KNOW THE TRUTH (VS.20)
How to know the TRUTH?
By continuing to the WORD OF GOD (John 8:31-32)
Kapag alam mo ang katotohanan makakalaya ka sa lahat ng tanikala ng kaaway.
Iiwan mo yung bagay na dapat iwan
Babaguhin mo yung maling kaugalian.
At tatalikuran mo yung dapat talikuran.
II. KEEP IN YOUR HEARTS WHAT YOU HAVE LEARNED (VS.24-25)
When you keep in your hearts what you’ve learned about Christ, The Son and the
Father will dwell in you.
Huwag mong sayangin yung mga bagay na natutunan mo sa Paginoon.
Lahat ng narinig mo sa Panginoon iukit mo dyan sa puso mo. (Proverbs 4:20-23)
Hindi yung mga naririnig mo lagpas sa kabilang tenga.
O kaya naman sasabihin ah hindi para sakin yan.
O baka naman dinidedma mo lang yung mga sinasabi sayo ni Lord.
III. ABIDE IN JESUS CHRIST (VS. 28)
Magstay ka sa piling ni Jesus Christ kung gusto mong manatili yung anointing mo
at kung ayaw mong maloko ka ng kaaway.
When you abide in Jesus:
● You will bear fruit (John 15:4)
Magbubunga ka kung mananatili ka sa Panginoon.
Karamihan kasi sa mga tao ngayon ayaw manatili kay Jesus, gusto lagi
makawala kaya anong nangyayari, nabubulok.
Ang sanga kung hindi nakaconnect sa puno anong mangyayari? MATUTUYO
Kaya pansinin mo yung ibang tao mukhang tuyong tuyo.
● All your prayers will be answered (John 15:7)
Ibibigay ni Lord sayo yung matagal mo ng pinapanalangin.
CONCLUSION:
IN THIS WORLD FULL OF DECEIVER I MJST KEEP MY ANONITNG BY ALWAYS
KNOWING THE TRUTH, BY KEEPING ALL THINGS THAT I’VE LEARNED ABOUT
CHRIST AND BY ABIDING IN HIM SO THAT WHEN HE APPEARS, I MAY HAVE
CONFIDENCE AND NOT BE ASHAMED BEFORE HIM AT HIS COMING.
MGA KAPATID NAWA’Y ITO’Y ISAGAWA NATIN AT HINDI LANG SA SALITA.
Tayo kasing mga tao magaling sa salita pero kunlang sa gawa. (Story;Take my
heart)