REFERENCE ITEM DESCRIBTION Buildings Classifications GENERAL Occupancy / # Of People In Buildings/Spaces EQUATIONS (SI) HVAC Design Strategy HVAC SYSTEM SELECTION / DESIGN STRATEGY PAGE IN PDF HANDBOOK 2018 NFPA 101 / Life Safety Code 2004 CIBSE-Guide G / Public Health Engineering 2016 ASHRAE 62.1 2018 NFPA 101 / Life Safety Code 2006 SMACNA-Duct Design A.3.3.196 2.4.4 CH.06 7.3.1 A … … Table 6.2.2.1 Table 7.3.1.2 … 391-393 16 15-18 84 362-364 CH.26 … 319 Carrier-Part1 / Load Estimating INDEX … 162, 163 2013 ASHRAE Pocket Guide 2005 CIBSE-Guide B / Heating, Ventilating, Air Conditioning & Refrigerating CH.02 Fig.2.1 / Table 2.1 79, 80 HVAC System Selection By ASHRAE 2016 ASHRAE System & Equipment CH.01 … 6-14 1987 SMACNA - HVAC Applications 1.3 Table 1-1 17 HVAC System Selection By Carrier Carrier-Part9 / System And Applications CH.01 Table 2 757 2010 ASHRAE 90.1 A-D Table B3 145 2017 ASHRAE Fundamental CH.14 … 345 (UAE) 2006 CIBSE-Guide A / Environmental Design 2.6 Table 2.26 60-63 Carrier-Part1 / Load Estimating CH.02 Table 1 12-19 2017 ASHRAE Fundamental 1.8, 1.9 Fig.1 15, 16 Psychometric Chart/Proccess/Equations (Sensible/Latent Cooling, Sensible/Latent Heating, Humidification, De-Humidification, Evaporating Cooling, Chemical De-Humidification) Construction U-Value (Wall, Roof, Partition) Glazing U, SC Values Internal Heat Gain (People/Occupants) COOLING & HEATING LOAD ESTIMATION Internal Heat Gain (Light) Internal Heat Gain (Equipment/Appliances) M Internal Heat Gain (Pipes, Ducts, Tanks, AC Motors) Infiltration Indoor Design Conditions Such As / System Selection, Design Temperature, OA/EX Air Recirculated, +/Pressure, Minimum ACH, Humidity, Filtration-MERV, Noise Level / For (Residential, Hotels, Commercial, Industrial, Educational, Retails, Health Care, Clean Rooms, Laboratories, Data Centers, Indoor Swimming Pools/Spa) O R R Diversity Factor N HVAC DESIGN TABLE/CHART/FIGURE HVAC System Selection By SMACNA Outdoor Conditions (Climate Data) HVAC CHAPTER.SECTION AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE Air, Fan, Pump, Hydronic Equations HANDBOOK R S SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE Fouling Factor 2016 ASHRAE System & Equipment 4.1 Fig.2-Fig.7 41, 42 2005 CIBSE-Guide B / Heating, Ventilating, Air Conditioning & Refrigerating 2.4, A2 Fig 2.35 / Table 2.A2.1 163, 219, 220 2017 ASHRAE Fundamental 18.6 Table 18 506 2017 ASHRAE Fundamental 25.2 … 716 2006 CIBSE-Guide A / Environmental Design 3.3, 3.4 Table 3.1 97, 100 Carrier-Part1 / Load Estimating CH.05 Table 34 77-80 2017 ASHRAE Fundamental 15.3 Table 4, 10 355, 356, 368-375 2017 ASHRAE Fundamental 18.4 … 485 2006 CIBSE-Guide A / Environmental Design 3.6 Table 3.23 - Table 3.31 112-116 Carrier-Part1 / Load Estimating CH.04 Table 16, 17 52-55 2017 ASHRAE Fundamental 18.2.1 Table 1 473 2006 CIBSE-Guide A / Environmental Design 6.3 Table 6.2, 6.3 268, 269 Carrier-Part1 / Load Estimating CH.07 Table 48 100 2018 NFPA 101 7.3.1 Table 7.3.1.2 84 2017 ASHRAE Fundamental 18.2.2 Table 2, 3 474, 475 2006 CIBSE-Guide A / Environmental Design 6.4 Table 6.2, 6.4, 6.5 269, 270 Carrier-Part1 / Load Estimating CH.07 Table 49 101 2017 ASHRAE Fundamental 18.2.3, 18.2.4 Table 4 - Table 12 476-483 2006 CIBSE-Guide A / Environmental Design 6.5-6.8 Table 6.2, Table 6.6 - Table 6.16 269, 271-278 Carrier-Part1 / Load Estimating CH.07 Table 50 - Table 53 Carrier-Part1 / Load Estimating CH.07 Table 54 - Table 60 107-113 2017 ASHRAE Fundamental 18.3 … 483, 484 441, 445 101-105 2017 ASHRAE Fundamental 16.11, 16.13 Table 10, 11 2005 CIBSE-Guide B / Heating, Ventilating, Air Conditioning & Refrigerating 1.3 Table 1.5 14 2006 CIBSE-Guide A / Environmental Design 4.7 Table 4.13 - Table 4.17 160, 161 Carrier-Part1 / Load Estimating CH.06 Table 43, 44 94-96 2011 ASHRAE Application CH.01-CH.33 Design Tables 12-460 2006 CIBSE-Guide A / Environmental Design 1.4 Table 1.5 13-15 2005 CIBSE-Guide B / Heating, Ventilating, Air Conditioning & Refrigerating 2.3 … 89-124 Carrier-Part1 / Load Estimating 24, 25 CH.02 Table 5 2006 CIBSE-Guide A / Environmental Design 5.10 Table 5.18 201 Carrier-Part1 / Load Estimating CH.03 Table 14 40, 41 Carrier-Part5 / Water Conditioning CH.01 CH.01-CH.03 459 Carrier-Part5 / Water Conditioning CH.05 Table 11 485 REFERENCE ITEM DESCRIBTION Ventilation General Schematic, Equations GENERAL Air Classifications HANDBOOK CHAPTER.SECTION TABLE/CHART/FIGURE PAGE IN PDF HANDBOOK 2016 ASHRAE 62.1 CH.03, A Table E-1 / Fig.3.1, A1, E1, E2 6, 26, 44, 45 CH.05 Table 5.16.1 11 149 2016 ASHRAE 62.1 2006 CIBSE-Guide A / Environmental Design Air Intake Minimum Separation Distance 2016 ASHRAE 62.1 AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE 2017 ASHRAE Fundamental R S SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE Indoor Air Quality / Air Contaminants Outdoor Air Ventilation By (Rate) Exhaust Air Ventilation By (Rate) HVAC DESIGN 8 11.4 Table 13 261 2016 ASHRAE 62.1 A Table C1, C2, C3 35-41 4.2, 8.4 Table 4.2, Table 8.2 150, 302 2016 ASHRAE 62.1 CH.06 Table 6.2.2.1 15-18 2016 ASHRAE 62.2 CH.04 Table 4.1 5 Carrier-Part1 / Load Estimating CH.06 Table 45 97 1.4 Table 1.5 13-15 2005 CIBSE-Guide B / Heating, Ventilating, Air Conditioning & Refrigerating 1.2, 2.3 Table 1.2, 2.9 11, 90 2017 ASHRAE 170 CH.07, CH.08, CH.09 Table 7.1, 8.1, 9.1 9-13, 17-21, 25-29 2006 CIBSE-Guide A / Environmental Design 1.4 Table 1.5 13-15 2005 CIBSE-Guide B / Heating, Ventilating, Air Conditioning & Refrigerating 2.3 Table 2.9 90 2016 ASHRAE 62.1 CH.06 Table 6.5 22 2016 ASHRAE 62.2 CH.05 Table 5.1, 5.2 7 Carrier-Part1 / Load Estimating CH.06 Table 45 97 90 Exhaust Air Ventilation By (ACH) 2005 CIBSE-Guide B / Heating, Ventilating, Air Conditioning & Refrigerating 2.3 Table 2.9 Tobacco / Smoking Area Ventilation Rates 2005 CIBSE-Guide B / Heating, Ventilating, Air Conditioning & Refrigerating 2.3 Table 2.11 2011 ASHRAE Application CH.33 Table 2 - Table 4 440-442 Commercial Kitchen Ventilation Rates (Hood/Canopy, Ceiling Extract/MakeUp) 2005 CIBSE-Guide B / Heating, Ventilating, Air Conditioning & Refrigerating 2.3.6 … 100, 101 Car Parking Extract Ventilation Rate CH.06 … 176 2.3 Table 2.9 90, 123 17-24 2006 BS 7346-7 CH.06 … CH.53 … 918 Car Parking CO System 1998 NFPA 720 / Standard For Carbon Monoxide Warning Equipment CH.02 … 8-11 Corridor/Lift Lobby Smoke Extract 2003 CIBSE-Guide E / Fire Engineering 7.2 … 77 2003 CIBSE-Guide E / Fire Engineering 7.2 … 77 914-916 2011 ASHRAE Application CH.53 Table 2, Table 3 / Fig.18 2003 CIBSE-Guide E / Fire Engineering 7.2 … 77 2011 ASHRAE Application CH.53 Fig.11 910 2011 ASHRAE Application CH.53 … 908-913 1998 BS 5588-4 A-D … 61-70 Lift/Elevator Pressurization 1998 BS 5588-4 A-D … 61-70 Duct sizing SMACNA recommendation 2006 SMACNA-Duct Design 7.3 … 189 2006 SMACNA-Duct Design 5.9.2 … 106 2006 SMACNA-Duct Design 7.3.2 … 190 2017 ASHRAE Fundamental 21.6.3 … 621 2017 ASHRAE Fundamental 21.6.3 Table 12 620 2005 CIBSE-Guide B / Heating, Ventilating, Air Conditioning & Refrigerating 3.3.2 Table 3.2-Table 3.4 230 Carrier-Part2 / Air Distribuation CH.02 Table 7 202 2011 ASHRAE Application CH.33 … 446 2014 NFPA 96 / Commercial Cooking Operation A … 41 2013 ASHRAE Pocket Guide CH.02 Table 2.9 60, 64 85 M StairCase Pressurization + Relief Vent Sizing Duct sizing By Equal friction method Duct sizing By Velocity & Nc Commercial Kitchen Duct Sizing Contaminant Duct Sizing Smoke/Grease/Gases/Dry Dust/Industrial Dust/Heavy Dust/ Moist Dust 4.6 Table 4-1 1.5.5 Fig.1-1 33 Duct Friction Loss 2017 ASHRAE Fundamental 21.3.1 Fig.10 607 Duct Round Rectangular Equivalent 2017 ASHRAE Fundamental 21.3.1 … 606 R 2006 SMACNA-Duct Design 2005 SMACNA-Duct Construction R Duct Pressure Classification O 2017 Veterans Affairs 2005 CIBSE-Guide B / Heating, Ventilating, Air Conditioning & Refrigerating 2011 ASHRAE Application Corridor/Lift Lobby/Atrium Make-Up/Pressurization DUCT DESIGN 92 Car Parking Make-Up Ventilation Rate By Velocity Atrium Smoke Extract N HVAC VENTILATION RATES (OA, EA, SMOKE) Table 4.1 Table 5.5.1 2006 CIBSE-Guide A / Environmental Design 2006 CIBSE-Guide A / Environmental Design Outdoor Air Ventilation By (ACH) 4.2 CH.05 Dampers, Attenuators, Coils Friction Loss 2006 SMACNA-Duct Design 8.2 Fig.8-2 - Fig.8-26 254-260 Duct Fittings Friction Loss Carrier-Part2 / Air Distribuation CH.02 Table 9 - Table 13 / CH.9 204-211 REFERENCE ITEM DESCRIBTION Exhaust, Fresh air & Sand trap Louvers Sizing GENERAL CHAPTER.SECTION 2017 ASHRAE Fundamental 21.6.1 Fig 19 615 8.2.6 Fig 8-27 / Table 8-8 262, 263 2006 SMACNA-Duct Design Carrier-Part2 / Air Distribuation Outlet sizing By Velocity AIR OUTLET DESIGN AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE HYDRONIC PIPES DESIGN 235 Table 1 971 Table 3.5 230 8.2.6 Fig 8-27 / Table 8-8 262, 263 Grills And Diffusers Friction Loss Carrier-Part2 / Air Distribuation CH.03 Table 21 242-249 Relief Damper Sizing 1998 BS 5588-4 A-D … 68-70 2017 ASHRAE Fundamental 22.3 Fig.14-Fig.16 656, 657 2005 CIBSE-Guide B / Heating, Ventilating, Air Conditioning & Refrigerating 1.4.3 … 19 Balancing Valves Sizing & Selection 2016 ASHRAE System & Equipment 47.4 Fig.20-Fig.22 808, 809 Control Valves Sizing & Selection 2016 ASHRAE System & Equipment Hydronic Fittings/Valves Friction Loss (Tables / Equation) 47.3 Fig.16-Fig.19 807, 808 2017 ASHRAE Fundamental 22.3 Fig.14-Fig.16 656, 657 2017 ASHRAE Fundamental 22.1.4 … 636 2017 ASHRAE Fundamental 22.1.4 Table 3-Table 7 636-638 Carrier-Part3 / Piping Design CH.01 Table 10, 11, 12 280-282 2016 ASHRAE System & Equipment 13.2 … 264-266 Expansion Tank Sizing 1989 BS 7074 2003 BS 12828 D-2 … 36-39 Expansion Tank Location 2016 ASHRAE System & Equipment 13.2.3 Fig.16 271 22.3.2 … 657 Air Separator Location 2017 ASHRAE Fundamental Pressurization / Make-Up Water Unit Sizing 1989 BS 7074 Pressurization / Make-Up Water Unit Location 2016 ASHRAE System & Equipment 13.2.9 Fig.40 281 2010 ASHRAE Refrigerant CH.01 Table 3,4,5 / Fig.1,2 9-12 2010 ASHRAE Refrigerant CH.01 Table 1 9-12 2017 ASHRAE Fundamental 22.2.3 Fig.15 657 Carrier-Part7 / Refrigeration Equipment CH.01-CH.04 … 586-634 Boiler Selection Carrier-Part8 / Auxiliary Equipment CH.03 … 707-716 Cooling Tower Selection Carrier-Part7 / Refrigeration Equipment CH.05 … 643-646 656-706 Chemical Dosing Pot Feeder (Manual) Chemical Dosing Pump (Automatic) Refrigerant Gas Flow Rate REFRIGERANT PIPES DESIGN Refrigerant Pipe Sizing By Velocity/Friction Loss/Development Length Loss Chillers Selection Heat Exchanger Selection Pump Selection Carrier-Part8 / Auxiliary Equipment CH.01, 02 … DX/CHW Air Handling Units / Fan Coil Units Selection Carrier-Part6 / Air Handling Equipment CH.02 … 528-540 Fans Selection Carrier-Part6 / Air Handling Equipment CH.01 … 520, 521 CH.03 EQUIPMENT SELECTION Dx Split Unit Selection M Dx VRF Units Selection Carrier-Part6 / Air Handling Equipment … 554-557 2016 ASHRAE System & Equipment 20.2.3 … 356-358 Air Outlet Selection Carrier-Part2 / Air Distribuation CH.03 Table 21 241-249 Sound Attenuator Selection 2011 ASHRAE Application CH.48 … 787-789 Control/Balancing Valves Selection 2016 ASHRAE System & Equipment 47.3, 47.4 … 807-809 R Dx Package Units Air Curtain Selection R O N HVAC DESIGN Table 20 57.1 3.3.2 2006 SMACNA-Duct Design Hydronic Pipe Friction Loss (Chart / Equation) EXPANSION TANK, PRESSURIZATION UNIT, AIR SEPARATOR, CHEMICAL PUMP/POT SIZING CH.03 Exhaust, Fresh air & Sand trap Louvers Friction Loss Hydronic Pipe Sizing By Velocity/Friction Loss HVAC 2011 ASHRAE Application 2005 CIBSE-Guide B / Heating, Ventilating, Air Conditioning & Refrigerating TABLE/CHART/FIGURE PAGE IN PDF HANDBOOK HANDBOOK R S SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE REFERENCE ITEM DESCRIBTION TABLE/CHART/FIGURE PAGE IN PDF HANDBOOK 13.2.8 Fig.35 279 3.2 Fig.1, Fig.2 29 13.2.8 Fig.36 279 HANDBOOK CHAPTER.SECTION Central Hydronic Primary Constant flow (Air Cooled Chillers) 2016 ASHRAE System & Equipment Central Hydronic Primary Variable flow (Air Cooled Chillers) 2016 ASHRAE System & Equipment Central Hydronic Primary/Secondary Variable Flow (Air Cooled Chillers) 2016 ASHRAE System & Equipment Central Hydronic Primary/Secondary Variable Flow (Combined Chilled/Hot Chiller And Boiler) 2016 ASHRAE System & Equipment GENERAL R S SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE Fig.38, Fig.39 280 2016 ASHRAE System & Equipment 3.2 Fig.3 30 Central Hydronic Primary/Secondary Variable flow With Expansion Tank And Air Separator (Boiler) 2016 ASHRAE System & Equipment 3.2 Fig.4 30 District Cooling With Building Pump (Direct) 2016 ASHRAE System & Equipment 12.4.1 Fig.25 249 District Cooling Without Building Pump (Direct) 2016 ASHRAE System & Equipment 12.4.1 Fig.26 250 District Cooling (In-Direct) 2016 ASHRAE System & Equipment 12.4.2 Fig.28 251 Central Hydronic Circuit Types 2016 ASHRAE System & Equipment 13.2.4 Fig.17-Fig.20 272 Central Hydronic Direct And Reverse Return 2016 ASHRAE System & Equipment 13.2.4 Fig.21 273 Central Hydronic Decoupler / ByPass Line For Primary/Secondary 2016 ASHRAE System & Equipment 13.2.3 Fig.10 268 Central Hydronic Decoupler / ByPass Line For Variable Primary 2016 ASHRAE System & Equipment 3.2 Fig.1, Fig.2 29 AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE 13.2.8 Central Hydronic Primary/Secondary Variable flow With Condensing Pump (Cooling Tower) HYDRONIC SCHEMATIC/LOOP AND HOOK-UP Central Hydronic Expansion Tank 2016 ASHRAE System & Equipment 13.2.3 Fig.15, Fig.16 271 Central Hydronic Make Up Water And Expansion Tank 2016 ASHRAE System & Equipment 13.2.9 Fig.40 281 Central Hydronic Control Valves 2016 ASHRAE System & Equipment 13.2.5 Fig.22, Fig.24 273, 274 Chilled Water Pump Hook-Up (End-Suction, In-Line) 2016 ASHRAE System & Equipment 44.16 Fig.51, Fig.52 762 Cooling Tower Hook-Up 2016 ASHRAE System & Equipment 40.5 Fig.22-Fig.24 704 821 Manual Chemical Dosing Pot Hook Up DX SCHEMATIC/LOOP AND HOOK-UP DX Split Unit Schematic 2016 ASHRAE System & Equipment 49.1 Fig.3 DX Window Unit Schematic 2016 ASHRAE System & Equipment 50.1 Fig.1 835 DX Package Unit Schematic 2016 ASHRAE System & Equipment 49.2 Fig.4-Fig.10 823, 824 DX VRF Schematic 2016 ASHRAE System & Equipment CH.18 Fig.2-Fig.4 316-317 Heat Pump Schematic 2016 ASHRAE System & Equipment 49.5, 49.6 Fig.12, Fig.14-Fig.17 829, 830-832 Ventilation General Schematic, Equations 2016 ASHRAE 62.1 CH.03, A Table E-1 / Fig.3.1, A1, E1, E2 6, 26, 44, 45 AHU Ducting Schematic (Constant Flow) 2016 ASHRAE System & Equipment 4.2.1 Fig.9 47 AHU Ducting Schematic (Variable Flow) 2016 ASHRAE System & Equipment 4.2.1 Fig.10 47 AHU Ducting Schematic (Multi Zones) 2016 ASHRAE System & Equipment 4.2.2 Fig.13 49 FAHU With HRW Ducting Schematic 2005 CIBSE-Guide B / Heating, Ventilating, Air Conditioning & Refrigerating 2.4.10 Fig.2.34 162 Energy Recovery (Heat/Enthalpy/Desiccant Wheel, Heat Exhanger, Heat Pipe) 2016 ASHRAE System & Equipment 26.6 Fig.14-Fig.19 443, 444 AHU Ducting Schematic (Primary/Secondary, Under Floor, Wetted Coil) 2016 ASHRAE System & Equipment 4.2.4 Fig.14-Fig.16 50, 51 PACU Ducting Schematic 2016 ASHRAE System & Equipment 2.5 Fig.1-Fig.3 20, 21 2011 ASHRAE Application CH 53 Fig.11 910 2011 ASHRAE Application CH 53 Fig.12-Fig.16 911-913 2000 NFPA 92A / Practise Smoke Control System CH 02 Fig.2.3.2.2.1-Fig.2.3.5.2.1b 43386 1998 BS 5588-4 9.1.6 Fig.7a, Fig.7b 36-39 2011 ASHRAE Application CH 53 2009 NFPA 92B / Smoke Control System In Mall, Artia, Large Areas CH.05, A 13, 14, 20, 21 2011 ASHRAE Application CH.15 Fig.25, Fig.26 Fig.5.5.1, Fig.5.5.2, Fig.A.3.3.12.1Fig.A.3.3.12.3 Fig.3, Fig.4 DUCTING SCHEMATIC/LOOP AND HOOK-UP Kitchen Ventilation Ducting Schematic M Corridor/Lift Lobby Extract/Pressurization With SMFD Schematic Staircase/Lift Pressurization Schematic (Single Inject, Multi Inject, ByPass, Relief Vent) SMOKE MANAGEMENT SCHEMATIC/LOOP AND HOOKUP Atrium Extract/Pressurization Schematic Car Parking Extract/MakeUp Schematic R Noise Level Limitations O ACOUSTIC, NOISE LEVELS, VIBRATION ISOLATING R Recommended Air Velocities For NC N HVAC DESIGN HVAC Automatic Chemical Dosing Pump Hook Up 919 180, 181 2006 BS 7346-7 CH.07 Fig.1 19 2006 SMACNA-Duct Design A Table A.20 367, 368 765 2011 ASHRAE Application CH.48 Table 1 2006 CIBSE-Guide A / Environmental Design 1.8 Table 1.15 33 2011 ASHRAE Application CH.48 Table 8,9 776 Acoustic Design Recommendations 2011 ASHRAE Application CH.48 … 770 Acoustic Duct Liner Recommendations 2011 ASHRAE Application CH.48 … 783 Air Outlet Noise Recommendation 2011 ASHRAE Application CH.48 … 777 Sound Attenuator Components, Selection, P.D, V 2011 ASHRAE Application CH.48 Fig.20,21 / Table 27 785-787 Equipment Vibration Isolator Design & Selections 2011 ASHRAE Application CH.48 Table 47 807-810 REFERENCE ITEM DESCRIBTION HANDBOOK Duct Pressure Classification GENERAL 2006 SMACNA-Duct Design 2005 SMACNA-Duct Construction Fig.1-1 33 298-300 339-342 2014 NFPA 96 / Commercial Cooking Operation CH.05 … 11-13 2011 ASHRAE Application CH.33 … 438-445 2005 SMACNA-Duct Construction A Table A.1,2,3,4,5 357-360 2005 SMACNA-Duct Construction CH.02 Table 2-47M 152 Carrier-Part2 / Air Distribuation CH.02 Table 16 225 Duct Joints & Reinforcing Carrier-Part2 / Air Distribuation CH.02 Table 15,17 / Fig.58-Fig.60 225-227 Duct Support 2005 SMACNA-Duct Construction 5.2.11 Table 5-1M, 5-2 / Fig.5-5,5-7,5-9M 234, 236, 241, 245 Typical Duct Fittings Installation 2005 SMACNA-Duct Construction 4.1 Fig.4-1 213 2005 SMACNA-Duct Construction 4.1 Fig.4-2,4-3, Chart.4-1M 214, 215, 216, 223 2006 SMACNA-Duct Design 5.15, A Fig.5-12, Table A-7 118, 119, 322, 323 EN 1505 … … … Duct Tee, Elbow branch 2005 SMACNA-Duct Construction 4.1 Fig.4-5 218 AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE Duct Material (Thickness/Weight) Duct Elbows / Splitter Vanes AIR DUCT Table 4-1 … Duct Dimension Gage / Thickness Relationship Duct Branches, TakeOffs 2005 SMACNA-Duct Construction 4.1 Fig.4-6 219 Duct Transitions, OffSet, Bell Mouth 2005 SMACNA-Duct Construction 4.1 Fig.4-7 220 Duct Obstructions 2005 SMACNA-Duct Construction 4.1 Fig.4-8 Duct Aspect Ratio Allowance Range 2016 ASHRAE System & Equipment 21.6.1 … 616 Volume Control Damper (VCD)) 2005 SMACNA-Duct Construction CH.07 Fig.7-4, 7-5 266, 267 2005 SMACNA-Duct Construction CH.07, CH.08 Fig.7-14, 8-1 279, 283 Fire Damper (FD) Smoke Damper (SD) Combination Fire And Smoke Damper (MSFD) Relief Damper 221 2017 ASHRAE Fundamental 6.1 … 615 1999 NFPA 90A / Installation Of HVAC 3.3, A Fig.A.3.3 13, 14, 18 1999 NFPA 90A / Installation Of HVAC 3.3, A Fig.A.3.3 13, 14, 18 2017 ASHRAE Fundamental 6.1 … 615 1999 NFPA 90A / Installation Of HVAC 3.3, A Fig.A.3.3 13, 14, 18 615 2017 ASHRAE Fundamental 6.1 … Carrier-Part2 / Air Distribuation CH.01 Fig.5 172 2005 SMACNA-Duct Construction CH.07 Fig.7-2M, 7-3 263, 264 Back Draft Damper / Non Return Damper (NRD) Duct Access Doors 3.3.10 … 239, 240 2005 SMACNA-Duct Construction CH.07 Fig.7-8, 7-9, 7-10 270-272 Flexible Duct 2005 SMACNA-Duct Construction 3.7 Fig.3-8,3-9,3-10,3-11 203-208 Acoustic Lining 2005 SMACNA-Duct Construction CH.07 Fig.7-8, 7-9, 7-10 270-272 Minimum R Values 2017 ASHRAE Fundamental 23.1 Table 1 671 2017 ASHRAE Fundamental 23.2 Table 8 679 2017 ASHRAE Fundamental 26.4.1 Table 1 735-739 2017 ASHRAE Fundamental 23.1 Table 4 672 2017 ASHRAE Fundamental 23.3 Fig.7,8 686 2017 ASHRAE Fundamental 23.4 … 687, 688 M 2005 CIBSE-Guide B / Heating, Ventilating, Air Conditioning & Refrigerating Flexible Duct Connector Insulation Physical Properties Condensation Prevention / Thickness / Control Insulation Surface Temperature 2006 CIBSE-Guide A / Environmental Design 7.6-7.9 … 282-293 Insulation Heat/Energy Loss/Gain 2017 ASHRAE Fundamental 23.4 … 687 Weather Barriers / Jacketing 2017 ASHRAE Fundamental 23.2 … 680 Pre-Insulated Duct (Phenolic) 2016 ASHRAE System & Equipment 19.6 … 338 R R O DUCT INSULATION N HVAC 85 4.6 1.5.5 Table 11-1 2016 ASHRAE System & Equipment 2000 NFPA 92A / Practise Smoke Control System DUCT ACCESSORIES PAGE IN PDF HANDBOOK CH.11 Commercial Hood (Types, Materials, Thickness, Filtration, Third Party Test Certificates) DUCT CONSTRUCTION TABLE/CHART/FIGURE 19.7-19.13 Duct Material, Physical Properties, Third Party Test Certificates (Normal, Industrial, Kitchen, Smoke/Fire Rated, AntiBiotical, Rigid Plastic, Outdoor) 2006 SMACNA-Duct Design CHAPTER.SECTION R S SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE REFERENCE ITEM DESCRIBTION Hydronic Pipes (Material, Thermal Expansion, T, P, Wall Thickness, Weight, Conductivity, Density, Third Party Test Certificates) GENERAL TABLE/CHART/FIGURE PAGE IN PDF HANDBOOK 22.1.3 Table 1 632 22.1.8 Table 13 643 22.2.1 Table 16-Fig.18 646-648 22.1.3 Table 1 632 22.2.3 Table 19 649 2017 ASHRAE Fundamental 22.1.3 Table 1 632 2017 ASHRAE Fundamental 22.2.1 Table 16 646 2017 ASHRAE Fundamental 22.2.3 … 648-650 HANDBOOK CHAPTER.SECTION 2017 ASHRAE Fundamental 2017 ASHRAE Fundamental 2017 ASHRAE Fundamental Hydronic Fittings 2017 ASHRAE Fundamental HYDRONIC PIPE AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE HYDRONIC PIPES MATERIAL / INSTALLATION Hydronic Pipe Joints Hydronic Pipe Supports 2017 ASHRAE Fundamental 22.1.6 Table 10,11 641 Flexible Pipe Connector 2011 ASHRAE Application CH.48 Table 48 / Fig.45 812, 813 2017 ASHRAE Fundamental 23.1 Table 2 671 2017 ASHRAE Fundamental 23.2 Table 9 2017 ASHRAE Fundamental 23.2 Table 8 679 2017 ASHRAE Fundamental 26.4.1 Table 1 735-739 2017 ASHRAE Fundamental 23.1 Table 4 672 2017 ASHRAE Fundamental 23.4 … 687, 688 2006 CIBSE-Guide A / Environmental Design 7.6-7.9 … 282-293 2017 ASHRAE Fundamental 23.5 Table 17,18 690 2017 ASHRAE Fundamental 23.4 … 687 Weather Barriers / Jacketing 2017 ASHRAE Fundamental 23.2 … 680 Refrigerant Pipes (Material, Thermal Expansion, T, P, Wall Thickness, Weight, Conductivity, Density, Third Party Test Certificates) 2017 ASHRAE Fundamental 22.1.3 Table 1 632 2017 ASHRAE Fundamental 22.2.1 Table 17 647 Copper Tube (Description, Third Party Test Certificates) 2017 ASHRAE Fundamental 22.2 … 645 2017 ASHRAE Fundamental 22.1.3 Table 1 632 2017 ASHRAE Fundamental 22.2.3 Table 19, 20 649 Refrigerant Pipe Supports 2017 ASHRAE Fundamental 22.1.6 Table 10,11 641 Refrigerant Pipe, Fittings, Valves Friction Loss 2010 ASHRAE Refrigerant CH.01 Table 16-Table 18 24, 25 2017 ASHRAE Fundamental 23.1 Table 2 671 2017 ASHRAE Fundamental 23.2 Table 9 2017 ASHRAE Fundamental 23.2 Table 8 679 2017 ASHRAE Fundamental 26.4.1 Table 1 735-739 2017 ASHRAE Fundamental 23.1 Table 4 672 2017 ASHRAE Fundamental 23.4 … 687, 688 2017 ASHRAE Fundamental 23.5 Table 17,18 690 2017 ASHRAE Fundamental 23.4 … 687 Weather Barriers / Jacketing 2017 ASHRAE Fundamental 23.2 … 680 Chiller Types Selection And Capacity Range 2016 ASHRAE System & Equipment CH.43 Fig.5 733 Chillers Third Party Test Certificates 2016 ASHRAE System & Equipment CH.43 … 734, 735 Minimum Conductivity / Thickness Insulation Physical Properties HYDRONIC PIPES INSULATION Condensation Prevention / Thickness / Control Insulation Surface Temperature REFRIGERANT PIPE REFRIGERANT PIPES MATERIAL / INSTALLATION Refrigerant Fittings And Joints Minimum Conductivity / Thickness Insulation Physical Properties Condensation Prevention / Thickness / Control Insulation Surface Temperature M Insulation Heat/Energy Loss/Gain CHILLERS 2016 ASHRAE System & Equipment CH.43 Table 1 739 2016 ASHRAE System & Equipment CH.43 … 735-745 Carrier-Part7 / Refrigeration Equipment CH.01-CH.04 … 586-634 Cooling Towers (Types, Design, Heat Rejection, Construction Material, Selection, Piping, Capacity Control, Thermal Performance, Third Party Test Certificates) 2016 ASHRAE System & Equipment CH.40 … 693-713 Carrier-Part7 / Refrigeration Equipment CH.05 … 643-646 Centrifugal Pump (Components And Types) 2016 ASHRAE System & Equipment 44.1, 44.2, 44.3 Fig.1-Fig.12 747-750 Centrifugal Pump (Performance, Hydronic System Curves, Third Party Test Certificate) 2016 ASHRAE System & Equipment 44.4, 44.5, 44.6 Fig.13-Fig.22 750-753 Centrifugal Pump (Power, Efficiency, Radial Thrust, Affinity Laws) 2016 ASHRAE System & Equipment 44.7, 44.8, 44.9, 44.10 Fig.23-Fig.31 753-756 Centrifugal Pump Net Positive Suction Head (NPSH) 2016 ASHRAE System & Equipment 44.11 Fig.32-Fig.34 756, 757 Centrifugal Pump Arrangments (Parallel, Series, Stand-By, Primary-Secondary, VFD, DPT, Installation) 2016 ASHRAE System & Equipment 44.13, 44.14, 44.15, 44.16 Fig.36-Fig.52 758-762 Carrier-Part8 / Auxiliary Equipment CH.01, 02 … 656-706 2016 ASHRAE System & Equipment CH.43 … 735-745 2016 ASHRAE System & Equipment 32.1, 32.2 Fig.1-Fig.6 542-546 2016 ASHRAE System & Equipment 32.3-32.8 Fig.7, Fig.8 547-549 Carrier-Part8 / Auxiliary Equipment CH.03 … 707-716 Centrifugal Pump (Components And Types, Performance, Hydronic System Curves, Third Party Test Certificate, Selection, Power, Efficiency, Motors) Heat Exchangers (Design, Types, Selection, Components) Boilers (Residential, Commercial, P, T, Construction Material, Draft Type, Condensing Or NonCondensing, Selection) O BOILERS R HVAC PUMPS HEAT EXCHANGERS 679 Chillers Refrigerant Gas Properties R COOLING TOWERS 679 Reciprocating/Centrifugal/Screw Chillers (Types, Capacities, Selection, Pressure, Temperature, Refrigerant, Power Consumption, Fouling Factor, Control) N EQUIPMENT & SYSTEMS HVAC Insulation Heat/Energy Loss/Gain REFRIGERANT PIPES INSULATION 2017 ASHRAE Fundamental R S SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE Boilers (Efficiency, Performance, Third Party Test Certificate, Sizing, Selection, Burner Type, Control) REFERENCE ITEM DESCRIBTION HANDBOOK Valves (Fundamental, Material, Water Hammer, Noise, Flow, Pressure Drop, Cavitation, Third Party Test Certificate) Manual Valves (Types, Components, Selection) GENERAL 2016 ASHRAE System & Equipment Balancing Valves (Manual, Automatic Flow Limiting, Selection) 2016 ASHRAE System & Equipment AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE Multi-Purpose Valve, Safety Valve, Self Contained Temp Control Valve, PRV, Make Up Water Valve, Check Valve, Stop Check Valve, Back Flow Preventer, Steam Traps) 799-800 Fig.3-Fig.7 800-802 47.3 Fig.8-Fig.19 802-808 47.4 Fig.20-Fig.22 808, 809 Fig.23-Fig.29 809-812 49.1, 49.2 Table 1,2 / Fig.1-Fig.10 820-825 Carrier-Part6 / Air Handling Equipment CH.03 … 554-557 Air Source Heat Pump 2016 ASHRAE System & Equipment 49.5 Fig.12,13 828-830 Water Source Heat Pump 2016 ASHRAE System & Equipment 49.6 Table 3 / Fig.14-Fig.17 830-833 VRF Heat Pump 2016 ASHRAE System & Equipment 49.7 … 833 VRF (Types, Applications, Third Party Test Certificates, Control) 2016 ASHRAE System & Equipment 18.1, 18.2 Table 1 / Fig.1-Fig.6 316-320 VRF (Typical Refrigerant, Typical P-v Curve, Heat Recovery Types) 2016 ASHRAE System & Equipment 18.3 Table 2 / Fig.7-Fig.10 321, 322 VRF Design Consideration 2016 ASHRAE System & Equipment 18.5, 18.6, 18.7 Table 4, Table 5 / Fig.13-Fig.17 324-329 AHU (Advantages, Disadvantages, Zoning, Air T Vs Air Quality, Energy) 2016 ASHRAE System & Equipment CH.04 … 37-39 AHU (Psychometric Proccess, Dampers, Plenum, Filters, Fans, Coils, Humidifiers, De-humidifier) 2016 ASHRAE System & Equipment 4.1 Fig.1-Fig.8 39-46 AHU Distribuation System (Constant Flow, VAV, Single Duct, Dual Duct, Single Zone, Multi Zone, Primary/Secondary, Dedicated OA, Under Floor, Supersaturated, Low T, Smoke Control, Terminal Units, Control) 2016 ASHRAE System & Equipment 4.2 Fig.9-Fig.16 47-54 Recovery Unit (Applications, Thermodynamics, Air Flow, Air Leakage, Q, P, Filtration, Condensation, Freezing, Control, Performance, Third Party Test Certificate) 2016 ASHRAE System & Equipment 26.1-26.5 Table 1 / Fig.1-Fig.3 431-438 Recovery Unit Types (Advantages, Dis-advantages, Psychometric Proccess, Design, Control Method) 2016 ASHRAE System & Equipment 26.6, 26.7 Table 2, 3 / Fig.4-Fig.38 438-458 FCU (Advantages, Disadvantages) 2016 ASHRAE System & Equipment 5.1 … 56, 57 2016 ASHRAE System & Equipment 5.2, 4.16 Fig.1, Fig.10 59, 60, 70 2016 ASHRAE System & Equipment 20.2.3 Fig.6-Fig.8 354-356 FCU (Types, Damper, Filtration, Coil, Fan, Ducting, Control, Selection, Third Party Test Certificate) Carrier-Part6 / Air Handling Equipment CH.02 … 528-540 Air Curtain (Types, Effeciency, Selection, Design, Control) 2016 ASHRAE System & Equipment 20.2.3 Fig.9, Fig.10 356-358 Fans (Types, Components, Impeller Design, Housing Design, Performance Curve, Third Party Test Certificate) 2016 ASHRAE System & Equipment 21.1-21.4 Table 1 / Fig.1,2 360-364 Fans (Fan Laws, P, Q, Ducting, System Effect) 2016 ASHRAE System & Equipment 21.5-21.9 Table 2 / Fig.3-Fig.11 360-364 2016 ASHRAE System & Equipment 21.6-21.16 Table 3-Table 6 / Fig.12-Fig.18 368-372 Carrier-Part6 / Air Handling Equipment CH.01 … 520, 521 Carrier-Part6 / Air Handling Equipment CH.01 … 510-524 5-8 AIR CURTAIN FANS Fans (Selection, Parallel, Series, Noise, Vibration, Arrangment, Control) Fans (Types, Applications, Third Party Test Certificate, Designation, Performance, Selection, Accessories, Control, Locations, Multiple Installation) M 2017 ASHRAE 52.2 ECOLOGY UNIT (EU) 2017 ASHRAE 52.2 CH.03 … Classification Of Computer And Data Processing Room Air Conditioners (Designation, AHRI Type, Arrangement-Indoor/ID, Arrangement-Outdoor/OD) 2017 AHRI 1361 / Computer And Data Processing Room Air Conditioners CH.04 Table 1 9 Test Requirements (Limited Height Test Chamber Upflow Unit Test Duct) 2017 AHRI 1361 / Computer And Data Processing Room Air Conditioners CH.05 Fig.1 10, 11 Rating Requirements (Indoor Return Air Temperature Standard Rating Conditions, Heat Rejection / Cooling Fluid Standard Rating Conditions, Minimum External Static Pressure Standard Rating Conditions, Uncertainty Allowances, Minimum Data Requirements For Published Rating) 2017 AHRI 1361 / Computer And Data Processing Room Air Conditioners CH.06, CH.07 Table 2 - Table 6 11-15 Operating Requirements / Marking And Nameplate Data / Conformance 2017 AHRI 1361 / Computer And Data Processing Room Air Conditioners CH.08 - CH.10 … 16 CRAC Schematics/Typical Details/Tables (Ceiling Mounted Standard Model Airflow Configurations, Floor Mounted Standard Model Airflow Configurations, Cooling Fluid Reduced Ambient Rating Conditions) 2017 AHRI 1361 / Computer And Data Processing Room Air Conditioners A-C, A-D Table C1, C2, D1 19, 20, 24 R O AIR OUTLETS 2017 ASHRAE 52.2 2017 AHRI 1361 / Computer And Data Processing Room Air Conditioners R CLOSED CONTROL UNIT/COMPUTER ROOM AIR CONDITIONER (CCU/CRAC) 2017 ASHRAE 52.2 Definitions Grill & Diffusers (Types, Mixing, Temperature, Selection Procedure, Third Party Test Certificate) 2016 ASHRAE System & Equipment 20.1 Table 1 / Fig.1,2 345-348 Grill & Diffusers (Types, Special Feature, Installation, Accessories) 2016 ASHRAE System & Equipment 20.2.1, 20.2.2 Table 2 / Fig.3,4 348-351 Grill & Diffusers (Types, Application, Selection, Friction Loss) Carrier-Part2 / Air Distribuation CH.03 Table 20,21 / Fig.62-Fig.93 229-249 N EQUIPMENT & SYSTEMS Fig.1, Fig.2 47.2 47.5-47.11 VARIABLE REFRIGERANT FLOW (VRF) HVAC 47.1 2016 ASHRAE System & Equipment DX Units (Configrations, Installation, Types, Selection, Third Party Test Certificates) FAN COIL UINT (FCU) PAGE IN PDF HANDBOOK 2016 ASHRAE System & Equipment UNITARY AC UNITS (DX UNITS) ENERGY/HEAT RECOVERY/RECLAIM UNIT (HRW/ERV/HP) 2016 ASHRAE System & Equipment Control Valves (Types, Actuator Types, Flow, Sizing) HYDRONIC VALVES & ACCESSORIES AIR HANDLING UNIT (AHU) 2016 ASHRAE System & Equipment TABLE/CHART/FIGURE CHAPTER.SECTION R S SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE REFERENCE ITEM DESCRIBTION GENERAL PAGE IN PDF HANDBOOK 1.5 … 12, 13 3.1-3.7 … 30-53 5.1 … 76-78 1.8 Table 1.4 14 4.1 Fig.4.1-Fig.4.3 57 2011 ASHRAE Application CH.47 Fig.9 744 2011 ASHRAE Application CH.47 Fig.15, 31, 33, 34, 35 747, 754 2011 ASHRAE Application CH.47 … 749-752, 755-758 Energy Conservation / Cost Saving 2001 CIBSE-Guide H / Building Control System 2001 CIBSE-Guide H / Building Control System Control Safety (Alarm, Interlocks) 2001 CIBSE-Guide H / Building Control System BMS Benefits 2001 CIBSE-Guide H / Building Control System BMS Archetict 2001 CIBSE-Guide H / Building Control System AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE HVAC CONTROL/BMS TABLE/CHART/FIGURE Sensors, Actuators, Valves, Dampers, Motors, Pumps, Fans & Control CONCEPTS & FUNDAMENTAL AHU, FAHU, FCU (Coil, Humidification, De-Humidification, Heat Recovery, Pressure Independent VAV, Pressure Dependent VAV, Induction VAV, Static Pressure Sensor, Mixing Dampers, OA, CAV, Dual Duct) AIR SIDE 2011 ASHRAE Application CH.47 Fig.25-Fig.29 752, 753 2001 CIBSE-Guide H / Building Control System 5.5-5.11 … 103-123 Heat Pump Control 2001 CIBSE-Guide H / Building Control System 5.13 … 126-128 Natural Ventilation Control 2001 CIBSE-Guide H / Building Control System 5.14 … 128-131 2011 ASHRAE Application CH.47 Fig.1-Fig.8 741-743 2001 CIBSE-Guide H / Building Control System 5.2 … 78-82 2001 CIBSE-Guide H / Building Control System 5.3 … 82-85 2011 ASHRAE Application CH.47 Fig.13 746 2001 CIBSE-Guide H / Building Control System 5.3.3 … 85-86 2011 ASHRAE Application 744, 745 Boiler Control Chillers Control HYDRONIC SIDE Cooling Tower Control Hydronic Circuit Control (Diverting Circuit, Mixing Circuit, Injection Circuit, Throttling Circuit, Variable/Constant, Primary, Primary/Secondary, Decoupler, Differential Pressure Control, Minimum Flow Control) CH.47 Fig.10-Fig.12 2011 ASHRAE Application CH.47 Fig.14 747 2001 CIBSE-Guide H / Building Control System 5.4 … 89-103 Duct Leak Test SMACNA Recommendation 1985 SMACNA-Air Duct Leakage Test 1.5.1 … 10 Duct Leak Test Procedure 1985 SMACNA-Air Duct Leakage Test Sec 3 Fig 3.1 16-18 Duct Leak Test Allowance % 2016 ASHRAE System & Equipment 19.4 Table 2 334 Air Leakage Testing 2005 CIBSE-Guide B / Heating, Ventilating, Air Conditioning & Refrigerating 3.3.9 … 238, 239 Fire Damper Drop Test Hydronic Pipe Flushing Consideration (Design, Installation, Dynamic Flushing, Chemical Cleaning, Connection Between New And Existing Systems, Reports) Duct Cleaning 2012 BSRIA Guide (BG 29/2012) / Pre-Commissioning Cleaning CH.01-CH.07 … 13-111 Commissioning Proccess Stages 2010 BSRIA Guide (BG 11/2010) / Commissioning Job Book CH.01 … 9-11 2010 BSRIA Guide (BG 11/2010) / Commissioning Job Book A2 … 68-75 2010 BSRIA Guide (BG 11/2010) / Commissioning Job Book A3 … 76-85 2010 BSRIA Guide (BG 11/2010) / Commissioning Job Book A4 … 86-91 2017 ASHRAE Fundamental CH.37 … 932-968 2011 ASHRAE Application CH.38 … 559-564 BSRIA/CIBSE Air Balancing (Tolerance %, Air Flow Equations, Site Test Instruments, Flow Measurements, Traverse, Commissioning Procedure, Commissioning Method Of Statement, Reports) 2013 BSRIA Guide (BG 49/2013) / Commissioning Air System 2.6, CH.05, 6.1, CH.09 … 17, 50, 33-78 Chilled Water Balancing (Tolerance %, Chilled Water Flow Equations, Pre-Commissioning/Static, Instruments, Pump Start-Up, System Venting, Temperature Difference Method, Pre-Set Method, Proportional Method, Rated Differential Method, General Procedure, Primary/Secondary Circuits, Flow Measuring, Pump Head Measuring, Differential Pressure Measuring, Pump As Indicator, Instruments Locations) 2011 ASHRAE Application CH.38 … 564-572 Chilled Water Balancing (Tolerance %, Chilled Water Flow Equations, Pre-Commissioning/Static, Site Test Instruments, Flow Measurements, Commissioning Procedure, Commissioning Method Of Statement, Reports) 2010 BSRIA Guide (BG 2/2010) / Commissioning Water System 2.11, CH.03-CH.08 … 19, 22-83 Sound Testing 2011 ASHRAE Application CH.38 … 576-578 Vibration Testing 2011 ASHRAE Application CH.38 … 578-582 LEAK TEST (DUCT, HYDRONIC, REFRIGERANT) HVAC CHAPTER.SECTION HANDBOOK R S SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE Hydronic Pressure Test Refrigerant Pressure Test Commissioning Plan Reports (Commissioning Team, Design, Pre-Construction, Construction, Commissioning, Pre-HandOver, HandOver, Pre-Occupation, Post-Occupancy) Commissioning Check-List Reports (Design, Final Inspections, Pre-Commissioning, Setting To Work, Pump/Fan Performance Sheet, TAB Sheet, System Completion Certificate) Commissioning Proccess Reports (Specification, Report, Method Of Statement, Team Progress, Issues Log) Measurements, Instruments And Equations (Temperature, Humidity, Pressure, Air Velocity, FlowRate, Infiltration, Ventilation, CO2, Sound, Vibration, Rotative Speed, Thermal Comfort, Moisture, Heat Transfere, Air Contaminant, Mechanical Power) ASHRAE Air Balancing (Tolerance %, Air Flow Equations, Pre-Commissioning/Static, Instruments, Devices, System Check, Dampers, MultiZone, Dual Duct, Static Control, Pressure Independent VAV, Pressure Dependent VAV, Air Balancing Report) COMMISSIONING GENERAL/REPORTS M HVAC T&C DUCT/HYDRONIC FLUSHING/CHEMICAL/CLEANING AIR BALANCING SOUND/ACOUSTING & VIBRATION TESTING GREEN HVAC https://safeworkmethodofstatement.com N METHOD OF STATEMENT FOR INSTALLATION, TESTING & COMMISSIONING OF HVAC O R R CHILLED WATER BALANCING 2009 ASHRAE 189 REFERENCE ITEM DESCRIBTION GENERAL Definition, Terminology, Equations, Units And Symbols 2013 ASPE (Volume 1) / Fundamentals Of Plumbing Engineering 2013 ASPE (Volume 1) / Fundamentals Of Plumbing Engineering Plumbing Specifications 2013 ASPE (Volume 1) / Fundamentals Of Plumbing Engineering Plumbing Cost Estimation 2013 ASPE (Volume 1) / Fundamentals Of Plumbing Engineering Plumbing Shop Drawings And Reports Preparing 2013 ASPE (Volume 1) / Fundamentals Of Plumbing Engineering … 16-66 CH.02 Table 2-1 CH.03 … 89-117 CH.04 … 118-125 69-72 … 126-134 CH.07 … 150-165 Plumbing Value Engineering 2013 ASPE (Volume 1) / Fundamentals Of Plumbing Engineering CH.11 … 256-299 2009 IPC / International Plumbing Code 4.03 Table 403.1 40-42 2009 UPC / Uniform Plumbing Code CH.04 Table 4-1 56-59 2004 CIBSE-Guide G / Public Health Engineering 3.3 Table 3.1 - Table 3.8 39-41 2009 IPC / International Plumbing Code 709.1 Table 709.1 78 148 AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE CH.05 2013 ASPE (Volume 1) / Fundamentals Of Plumbing Engineering Drainage Fixture Units (DFU) 2009 UPC / Uniform Plumbing Code 702.1 Table7-3 2009 IPC / International Plumbing Code 709.3 … 77 2009 UPC / Uniform Plumbing Code 702.2, 702.3 Table7-4 147 23-28, 191-194 20-26 2009 UPC / Uniform Plumbing Code A-K 2013 ASPE (Volume 2) / Plumbing System CH.01, 08 2004 CIBSE-Guide G / Public Health Engineering 3.4.4 Table K-3 Table1-1 - Table1-6, Table8-6 Table8-10 Table 3.10, Table 3.11 1985 BS 8301 7.4.3 Table 4 / Fig.1-Fig.4 Drainage Flow Depth In Pipe % 2004 CIBSE-Guide G / Public Health Engineering 3.6.3 … 46 Drainage RainWater/Storm Flow Velocity (Terminal/Vertical Velocity, Mean/Sloping Drain Velocity, Self-Cleansing Velocity, Limits) 2013 ASPE (Volume 2) / Plumbing System CH.01 Table1-7 / Equ1-1, 1-4, 1-6, 1-7 21, 26-28, 70 2004 CIBSE-Guide G / Public Health Engineering 3.6.3 Fig.3.1-Fig.3.4 / Equ.3.5, 3.7 46-51 2009 IPC / International Plumbing Code 704, 911.3, 912.2.1, 1106.3 Table 704.1 72, 89, 106 2009 UPC / Uniform Plumbing Code 708.0, 718.1, 814.2, 909.0, … 151, 154, 162, 165 Drainage Flow Rate (Sewage/Waste FlowRate, Continuos Flow/Sump Pump, Intermittent Flow, Stack Capacities, Sloping Drain Capacities) DRAINAGE CAPACITY (FIXTURES, DFU, FLOW, VELOCITY) Drainage Horizontal Pipe Slope/Gradient/Pitch% (Drainage, Vent, RainWater/Storm, Building Drain/Sewer) SANITARY SYSTEM CH.01 Plumbing Energy Resources Conservation Drainage Fixtures (Min Quantities, Requirements) Drainage Hydraulic Jump Fixture Drain Sizing Drainage Pipe Sizing (Horizontal Sloped, Stack) M Condensation Drain Sizing (Horizontal/Stack Pipe) Condensation Drain P-Trap/Drain Pan Sizing (HVAC) DRAINAGE PIPES SIZING Vent Pipe Sizing (Common Vent, Wet Vent, Stack Vent, Vent Stack, Combination Drain/Vent, Sump Vent, Tank Vent, Chamber/Manhole Vent) R Building Drain/Sewer Sizing 42, 43 2013 ASPE (Volume 2) / Plumbing System CH.01, 12 … 28, 41, 284, 285 2004 CIBSE-Guide G / Public Health Engineering 3.6.3 Table 3.16 47 1985 BS 8301 7.4.4.4 … 22 2013 ASPE (Volume 2) / Plumbing System CH.01 … 21 2009 IPC / International Plumbing Code 7.09 Table 709.1 78 2009 UPC / Uniform Plumbing Code 702.1 Table7-3 148 2004 CIBSE-Guide G / Public Health Engineering 3.4.4 Table 3.11 2009 IPC / International Plumbing Code 710.1 Table 710.1(2) 79 2009 UPC / Uniform Plumbing Code 703.0 Table 7-5 149 43 2013 ASPE (Volume 2) / Plumbing System CH.01 Table 1-2, 1-3, 1-5 23, 24, 27 2004 CIBSE-Guide G / Public Health Engineering 3.6.3 Table.3.15,3.16 / Fig.3.1-Fig.3.4 47-51 1985 BS 8301 7.4.4 Fig.1-Fig.4 22-26 2009 IPC / International Plumbing Code 314.2 Table 314.2.2 37 2009 UPC / Uniform Plumbing Code 814.2 Table 8-2 162 2013 ASPE (Volume 2) / Plumbing System CH.01 … 300 2009 IPC / International Plumbing Code 314.2.3.1 2009 IPC / International Plumbing Code CH.09 87-92 2009 UPC / Uniform Plumbing Code 703.0 … Table 908.3, 909.3, 910.4, 912.3, 916.1, 916.5.1 Table 7-5 2009 IPC / International Plumbing Code 710 Table 710(1) 79 2009 UPC / Uniform Plumbing Code 717.0 Table 7-8 156 2013 ASPE (Volume 2) / Plumbing System CH.01 Table 1-7 28 2009 IPC / International Plumbing Code 1106 Table 1106.2(1), 1106.2(2), 1106.3 105, 106 38 149 2009 UPC / Uniform Plumbing Code 1106.0 Table 11-1, 11-2 181-183 CH.04 Table 4-4, 4-5 75, 78 2004 CIBSE-Guide G / Public Health Engineering 3.5.4 Table 3.13 45 Pool Main Drain/Grating Sizing 2013 ASPE (Volume 3) / Special Plumbing CH.06 … 128, 129 Special Waste Pipe Sizing 2013 ASPE (Volume 2) / Plumbing System CH.12 Table 12-1 284-286 Soil/Waste/Vent/Storm Stack Sizing (By Floors) 2011 Dubai Municipility / Dubai Trakhees 9.1.85, 9.1.86 … 8 R O 462, 463 2013 ASPE (Volume 2) / Plumbing System RainWater/Storm Pipe Sizing (Horizontal, Conductors, Leader/Stack) N PLUMPING PAGE IN PDF HANDBOOK CHAPTER.SECTION Plumbing Piping And Equipment Standards And Third Party Certificates PLUMBING FUNDAMENTAL TABLE/CHART/FIGURE HANDBOOK R S SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE REFERENCE ITEM DESCRIBTION GENERAL CHAPTER.SECTION TABLE/CHART/FIGURE 2009 IPC / International Plumbing Code 708 … 76, 77 707 … 150, 151 CH.01 … 30, 31 3.6.4 Table 3.17 52 3.13 … 43, 44 2009 IPC / International Plumbing Code 708.3.2 … 76 2009 UPC / Uniform Plumbing Code 710.5, 719.6 … 152, 155 2004 CIBSE-Guide G / Public Health Engineering 3.6.4, 10.9, 10.10.6 Table 3.17 52, 180-182 1985 BS 8301 5.7.1, 7.6.2, 7.6.6, 13.4 Table 7, 8 16, 27, 43-47 2009 UPC / Uniform Plumbing Code CleanOut/Rodding Eye (Location, Quantities, Sizing, Distances) 2013 ASPE (Volume 2) / Plumbing System 2004 CIBSE-Guide G / Public Health Engineering DRAINAGE MANHOLE/INSPECTION CHAMPER/TRAPS/CLEANOUT/RODDING EYE/BACK WATER VALVE DESIGN CRETIRIA AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE 1985 BS 8301 Manholes/Inspection Champers/Breaking Pressure Manhole (Types, Location, Quantities, Sizing, Depth, Invert Level, Cover Level, Distances) Gullay Traps/Building Traps (Location, Quantities, Sizing, Trap, Distances) Trap (Sizing, Siphonage, Seal Depth, P-Trap, Prohibited Trap, Acide Resisting Trap) BackWater Valves (Location, Applications, Sizing) RainWater/Storm Outlet/Drain/Gutter (Types, Location, Quantities, Sizing, Trap, Distances) 2009 IPC / International Plumbing Code 1002 … 94 2009 UPC / Uniform Plumbing Code 1001-1008 … 167, 168 2004 CIBSE-Guide G / Public Health Engineering 3.4.4 Table 3.11 43 CH.03 … 50, 51 2009 IPC / International Plumbing Code 715 … 82 2009 UPC / Uniform Plumbing Code 710.6 … 152 2013 ASPE (Volume 2) / Plumbing System CH.01 Fig 1-6 33 2009 IPC / International Plumbing Code 412, 709 … 45, 77, 78 2013 ASPE (Volume 2) / Plumbing System 2009 UPC / Uniform Plumbing Code 411.2, 702.1, … 52, 147, 148 2013 ASPE (Volume 2) / Plumbing System CH.01, CH.12 Table 1-8 / Fig 1-4, 1-5 31-33, 301, 302 2013 ASPE (Volume 4) / Plumbing Equipment CH.01 … 2009 IPC / International Plumbing Code 1105 Table 1106.6 99, 107 2009 UPC / Uniform Plumbing Code 1105 Table 11-3 177, 178, 184, 185 38 2013 ASPE (Volume 2) / Plumbing System CH.04 Fig.4-9 76, 77 2004 CIBSE-Guide G / Public Health Engineering 3.5.4 Table 3.13 45 2013 ASPE (Volume 3) / Special Plumbing CH.06 Fig.6-1 128, 129 2009 IPC / International Plumbing Code 711 … Planter Drain (Location, Quantities, Sizing, Distances) Timber Drain (Location, Quantities, Sizing, Distances) Pool Main Drain/Grating (Location, Quantities, Sizing, Hydrostatic Relief Valve, Distances) Velocity Breaker/Stack Offset (Location, Quantities, Sizing, Distances) Sump/Pump (Location, Application, Sizing) M Fats, Oils, Grease (FOG) Interceptor/Food Waste Grinder/Heat Tracing (Location, Applications, Sizing) Petrol/Oil/Flammable Liquid Interceptor (Location, Applications, Sizing) DRAINAGE SUMP/INTERCEPTORS/SEPTIC TANK/HOLDING TANK DESIGN CRETIRIA Sand Interceptor/Trap (Location, Applications, Sizing) 77 2013 ASPE (Volume 2) / Plumbing System CH.01 Fig 1-1 24, 25 2009 IPC / International Plumbing Code 712, 1113 Table 712.4.2 80, 108 2009 UPC / Uniform Plumbing Code 702.3, 710, 1101.5.3, 1107.0 … 147, 151-153, 175, 178 2013 ASPE (Volume 2) / Plumbing System CH.01, 04 Fig 1-2, 1-3 29, 30, 78, 79 1985 BS 8301 3.15 … 48-53 2009 IPC / International Plumbing Code 1002.1, 1003.3 Table 1003.3.4.1 94, 95 2009 UPC / Uniform Plumbing Code 1014.0, 1015.0 Table 10-2, 10-3 169-172 2013 ASPE (Volume 4) / Plumbing Equipment CH.08 … 180-193 1985 BS 8301 12.3 … 2009 IPC / International Plumbing Code 1003.4 … 95, 96 2009 UPC / Uniform Plumbing Code 1017.0 … 172, 173 38, 42 1985 BS 8301 12.2 Fig.7, 8 37, 38, 40, 41 2013 ASPE (Volume 2) / Plumbing System CH.12 … 304-306 2009 IPC / International Plumbing Code 1003.5 … 96 2009 UPC / Uniform Plumbing Code 1016.0 … 172 2009 UPC / Uniform Plumbing Code 1009.0 … 168, 169 SlaughterHouses Interceptor/Separator (Location, Applications, Sizing) 2009 UPC / Uniform Plumbing Code 1010.0 … 169 Commercial/Industrial Interceptor/Separator (Location, Applications, Sizing) 2009 UPC / Uniform Plumbing Code 1012.0 … Bottling Establishment Interceptor/Separator (Location, Applications, Sizing) 2009 UPC / Uniform Plumbing Code 1013.0 … 169 2009 IPC / International Private Sewage Disposal Code 802 … 215, 216 293, 454-456, 461-464 R R Industrial/Clarifier Interceptor/Separator (Location, Applications, Sizing) O Septic Tank/Private Sewage Disposable System (Location, Applications, Quantities, Sizing) N SANITARY SYSTEM PLUMPING Floor Drain/Area Drain/Trench Drain/Parking Drain/Angel Drain/Storm Drain/Catch Basin (Location, Quantities, Grating/Strainer Sizing, Outlet Sizing, Trap, Sediment Bucket) FLOOR/TRENCH/STORM/PARKING/POOL/PLANTER DRAIN/GRATING/OUTLET DESIGN CRITERIA PAGE IN PDF HANDBOOK HANDBOOK R S SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE Holding Tank/NonPotable Water ReUse Systems (Location, Applications, Quantities, Sizing) 169 2009 UPC / Uniform Plumbing Code K.2-K.5 … 2013 ASPE (Volume 2) / Plumbing System CH.08 … 184-189 2009 IPC / International Private Sewage Disposal Code 805, C103.8 … 128, 218 2009 UPC / Uniform Plumbing Code 1609.0 Table16-1 / Fig16-1 - Fig16-4 290, 291, 293, 295-298 2013 ASPE (Volume 2) / Plumbing System CH.02 … 45-47 REFERENCE ITEM DESCRIBTION GENERAL Drainage Fixtures (Material, Installation, Dimensions, Clearances, Third Party Test Certification) HANDBOOK CHAPTER.SECTION TABLE/CHART/FIGURE PAGE IN PDF HANDBOOK 2009 IPC / International Plumbing Code CH.04 … 40-50 CH.04 … CH.01 Table1-1 / Fig1-1 -Fig1-22 22-40 702 Table702.1 - Table702.3 70, 71 701.0 Table 7-1 145, 146 2013 ASPE (Volume 4) / Plumbing Equipment CH.02, 2A Table2-21 - Table2-23 70-72, 90, 91 1985 BS 8301 5.6.3 Table 2 13, 14, 16 2009 IPC / International Plumbing Code 704 … 72 2009 UPC / Uniform Plumbing Code 706.0 … 150 2004 CIBSE-Guide G / Public Health Engineering 3.4.5 … 43 2009 IPC / International Plumbing Code 703 … 72 2009 UPC / Uniform Plumbing Code 713.0-723.0, 315.0 … 153-157, 45 2013 ASPE (Volume 2) / Plumbing System CH.01 … 35, 36 33-36 2009 UPC / Uniform Plumbing Code 2013 ASPE (Volume 4) / Plumbing Equipment 2009 IPC / International Plumbing Code Drainage Pipe Installation (Size Change, Stack/Horizontal Connection, Future Provision) Relationship Between Number Of Stories And Ground/First Level Drainage Separation UnderGround/Building Sewer Drainage Pipes Installation In (Raft, Trench, Thrust Block, Min Distance From Building/Well/Tank) DRAINAGE SYSTEM MATERIALS / INSTALLATIONS / THIRD PARTY TEST CERTIFICATE Vent Pipe Installation (Fixture Vent, Max Distance From Trap, Vent Connection And Grade, Outdoor Vent Extension, Common Vent, Invidual Vent, Vent Stack, Stack Vent, Wet Vent, Island Vent, Circuit Vent, Combined Vent And Drain, Relief Vent-Stack For > 10 Branches, Vent For Stack Offset) Drainage Pipes Supports & Hangers SANITARY SYSTEM Drainage Fittings (Types, Application Of Use, Pipe/Fitting Connection, Third Party Test Certification) Drainage Pipe Joining (Types, Materials, Third Party Test Certification) Grating/Cover/Strainer (Types, Materials) Third Party Test Certification (Standard, Reference) M In-Direct Waste (Location, Applications, Funnel Floor Drain, Quantities, Sizing, Distances) Steam/Hot Water Waste (Applications, Sizing, Material, Sumps, Strainers) Condensate Waste (Applications, Sizing, Material, Separation/Treatment, Leak Detection) SPECIAL/IN-DIRECT WASTE SYSTEMS DESIGN/INSTALLATION Swimming Pool Waste (Applications, Sizes, Location) Chemical/Acid Waste (Applications, Floor Drain, Sizing, Material, Separation/Treatment, Nuetralization Tank, Leak Detection) 49-55 1985 BS 8301 3.11 … 2009 IPC / International Plumbing Code 903-915 … 86-90 2009 UPC / Uniform Plumbing Code 905-910 … 164-166 2013 ASPE (Volume 2) / Plumbing System CH.03 … 51-54, 58 2004 CIBSE-Guide G / Public Health Engineering 3.4.6 … 43, 44 1985 BS 8301 7.10 … 28 2009 IPC / International Plumbing Code 308 Table 308.5 34, 35 2009 UPC / Uniform Plumbing Code 314.0 2013 ASPE (Volume 4) / Plumbing Equipment CH.06, CH.02 Fig 6-3, 2-22 159, 87 2009 IPC / International Plumbing Code 702.4, 706 Table 702.4, 706.3 Table 3-1 72, 75, 76 45 2009 UPC / Uniform Plumbing Code 701.2, 706.0 Table 7-1 145, 146, 150 2013 ASPE (Volume 4) / Plumbing Equipment CH.02, 2A Table2-21 - Table2-23 70-72, 90, 91 1985 BS 8301 5.6.3 Table 2 13, 14, 16 2009 IPC / International Plumbing Code 705 … 72-75 2009 UPC / Uniform Plumbing Code 705.0 … 147, 149, 150 2013 ASPE (Volume 4) / Plumbing Equipment CH.02 … 81, 82 1985 BS 8301 4.21.2.2.3 … 61, 62 2013 ASPE (Volume 2) / Plumbing System CH.01 … 32 1985 BS 8301 5.7 … 16 2009 UPC / Uniform Plumbing Code CH.14 Table 14-1 259-284 2009 IPC / International Plumbing Code 802 … 84, 85 2009 UPC / Uniform Plumbing Code 801-809, 812 … 159-162 2013 ASPE (Volume 2) / Plumbing System CH.01 … 37 2009 IPC / International Plumbing Code 803.1 … 85 2009 UPC / Uniform Plumbing Code 810 … 161 2009 IPC / International Plumbing Code 314 … 37, 38 2009 UPC / Uniform Plumbing Code 814 … 162 2009 UPC / Uniform Plumbing Code 813 … 162 2013 ASPE (Volume 3) / Special Plumbing CH.06 Fig.6-1 128, 129 2009 IPC / International Plumbing Code 803.2, 803.3 … 85 2009 UPC / Uniform Plumbing Code 811 … 161, 162 CH.12 … 285-292, 301, 302 2013 ASPE (Volume 2) / Plumbing System CH.12 … 292-298 Infectious/Biological Waste (Applications, Material, Separation/Treatment, Leak Detection) 2013 ASPE (Volume 2) / Plumbing System CH.12 … 298-300 Double Containment Waste (Applications, Material, Separation/Treatment, Leak Detection) 302, 303 R 2013 ASPE (Volume 2) / Plumbing System Radioactive Waste (Applications, Material, Separation/Treatment, Leak Detection) CH.12 … 2013 ASPE (Volume 2) / Plumbing System CH.12 … 303 Flammble Liquids Waste (Applications, Material, Separation/Treatment, Leak Detection) 2013 ASPE (Volume 2) / Plumbing System CH.12 … 304-306 Drainage Test (Gravity Test, Vent Air Test, Vent Water Test, Pressure/Force Test) 2009 IPC / International Plumbing Code 312.2-312.4, 312.6-312.8 … 36 O R 2013 ASPE (Volume 2) / Plumbing System Fire Fighting Waste (Applications, Material, Sizing) Drainage SanitaryWare Test (Sink/Basin/BathTub Drain OverFlow & Leakage) Drainage Flow Test (Rate, Seal Depth, Floor Drain, Manhole, Chamber) N PLUMPING Drainage Pipes Sleeves DRAINAGE TESTING & COMMISSIONING 2009 UPC / Uniform Plumbing Code AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE Drainage Pip Third Party Test Certification (Above Ground, UnderGround, Building Drain/Sewer, High Pressure, Storm) R S SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE Drainage Air Test (For Stack Only) Sump Pump (Pump Pre-Commissioning/Flow/Pressure/Power/Control, Pump CutIn/Off with Float Switch Level Indicator) Automatic Grease Interceptor Testing And Commissioning REFERENCE ITEM DESCRIBTION GENERAL Cold Water Demand / Water Tank Storage (By Occupant/Bed/, By Fixtures) CHAPTER.SECTION 2013 ASPE (Volume 2) / Plumbing System CH.05 Table 5-5 90 2.4.3 Table 2.2 - Table 2.6 16-18 2004 CIBSE-Guide G / Public Health Engineering 2002 Plumbing Engineering Services Design Guide 2013 ASPE (Volume 2) / Plumbing System 2004 CIBSE-Guide G / Public Health Engineering AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE Hot Water Demand / Water Tank Storage 2002 Plumbing Engineering Services Design Guide COLD/HOT WATER CAPACITY (WATER DEMAND/STORAGE, WSFU, FLOWRATE) Occupancy Water Storage Duration Cold/Hot Water Supply Fixture Unit (WSFU) Cold/Hot Water Supply FlowRate (Fixture FlowRate, FlowRate/WSFU RelationShip, Flow Pressure) WATER SUPPLY PIPING/VALVES/FITTINGS (SIZING, VELOCITY, FRICTION LOSS, MATERIALS, JOINTS, SUPPORTS) Water Tank Pipes Sizing/Location (Filling/Domestic/Authority Pipe/Level, Pump Suction Pipe/Level, OverFlow Pipe/Level, Vent Pipe/Level, Drain Pipe/Level, Circulation Pipe/Level, Level Equalizing Pipe, Anti-Vortex Plate/Level) Cold/Hot Water Pipes/Valves/Fittings/Joints And Connections (Joining Method, Material, Third Party Test Certificate) Cold/Hot Water Pipes Hanger And Support Domestic Water Pumping System (Direct Main Feed System, OverHead/Roof/Elevated Tank With Gravity Supply/Boosting System, Transfer/House/Lifting Pump, Booster Pump, Hydropnuematic Tank/Pressure Vessel, Sequence Of Operation, Cut In/Cut Off Pressure, Schematic) M COLD WATER SYSTEM SIZING/DESIGN/INSTALLATION (C.W.TRANSFER/HOUSE/LIFTING PUMP, C.W.BOOSTER PUMP, C.W.CIRCULATION PUMP, HYDROPNEUMATIC TANK/PV, WATER METER, WHA, PRV, CROSSCONNECTION, COOLED COLD WATER SYSTEM/WATER COOLER/PHEX, DISINFECTION/WATER TREATMENT) Water Hummar Arrestor / WHA (Location, Sizing, Types, Water Hammer Reasons, Friction Loss, Installation) Pressure Reducing Valve / PRV (Location, Sizing, Types, Friction Loss, Installation) 10 Table 6-1 125 2.4.7 Table 2.10-Table 2.13, Table 2.15Table 2.18 19, 22, 25, 26 CH.01 Table 6 13 2.4.4 … 16 2016 ASHRAE 62.1 CH.06 Table 6.2.2.1 15-18 84 2018 NFPA 101 / Life Safety Code 7.3.1 Table 7.3.1.2 2002 Plumbing Engineering Services Design Guide CH.01 Table 3 11 2004 CIBSE-Guide G / Public Health Engineering 2.4.3.1 … 15, 16 2009 IPC / International Plumbing Code A-E Table E103.3(2) 145 2009 UPC / Uniform Plumbing Code CH.06 Table 6-5 142 2009 IPC / International Plumbing Code 604, A-E Table 604.3, 604.4, E103.3(3) 55, 146, 147 Fig A2, A3 311, 312 2013 ASPE (Volume 2) / Plumbing System 2009 UPC / Uniform Plumbing Code CH.05 Table 5-17, 5-19 / Fig 5-14 107, 110, 111 2009 UPC / Uniform Plumbing Code A 3.0-A 6.0 A-A 2013 ASPE (Volume 2) / Plumbing System CH.05 103-107, 111, 116 2004 CIBSE-Guide G / Public Health Engineering 2.9.3 Table A2, A3 / Fig A2-Fig A7 Table 5.18, 5.20, 5.21/ Fig 5.10-Fig 5.14 Table 2.19-Table 2.21 / Fig 2.21 305-320 2009 IPC / International Plumbing Code 606.5.3-606.5.8 … 61, 62 137 33-35 2009 UPC / Uniform Plumbing Code 607.0 … 2013 ASPE (Volume 2) / Plumbing System CH.05 … 86 2009 IPC / International Plumbing Code 605 Table 605.3-Table 605.8 56-61 2009 UPC / Uniform Plumbing Code 604.0-606.0 Table 6-4 134-137 2009 IPC / International Plumbing Code 308 Table 308.5 34, 35 2009 UPC / Uniform Plumbing Code 314.0 Table 3-1 45 2009 IPC / International Plumbing Code 606.5 … 61, 62 2009 UPC / Uniform Plumbing Code 608.1, 609.8 … 137, 139 2013 ASPE (Volume 2) / Plumbing System CH.05 Fig 5-2, 5-3 83-90 2004 CIBSE-Guide G / Public Health Engineering 2.4.2 Fig 2.2 -Fig 2.7 11-15 2002 Plumbing Engineering Services Design Guide CH.01 Fig.1-Fig.6 11, 12 A-E Table E201.1 156, 157 2009 UPC / Uniform Plumbing Code A-A Fig A-1 307 2013 ASPE (Volume 2) / Plumbing System CH.05 Table 5-1 80, 81 2004 CIBSE-Guide G / Public Health Engineering 2.3.5.2 Fig 2.1 10 2009 IPC / International Plumbing Code 604.7 … 56 2009 UPC / Uniform Plumbing Code 610.9, A-I 139, 443 2013 ASPE (Volume 2) / Plumbing System CH.05 2004 CIBSE-Guide G / Public Health Engineering 2.9.4.1 … Table 5-8 - Table 5-10 / Fig 5-5 - Fig 5-7(b) … 2009 IPC / International Plumbing Code 604.8 … 56 2009 UPC / Uniform Plumbing Code A 6.2 … 306 94-98 35 2013 ASPE (Volume 2) / Plumbing System CH.05 Table 5-4 84, 85, 88 2009 IPC / International Plumbing Code 605.3.1, 607.3.2, 608 Table 608.1 57, 63, 64 2009 UPC / Uniform Plumbing Code 603 Table 6-2, 6-3 128-134 2013 ASPE (Volume 4) / Plumbing Equipment CH.09 … 194-206 2004 CIBSE-Guide G / Public Health Engineering 9.3.4 … 151 2009 IPC / International Plumbing Code 610 … 68 2009 UPC / Uniform Plumbing Code 609.9 … 139 2013 ASPE (Volume 2) / Plumbing System CH.05 … 120 2004 CIBSE-Guide G / Public Health Engineering 6.5.7 … 110, 111 R R Cross-Connection Control/Prevention (BackFlow Preventer, Vacuum Breaker, Back Pressure, Back Siphonage, AirGap) Table 2 CH.06 2004 CIBSE-Guide G / Public Health Engineering 2009 IPC / International Plumbing Code Water Meter (Location, Sizing, Types, Friction Loss, Installation) O Cooled Cold Water System For Hotel Applications (Ablution, Plate Heat Exchanger With Chilled Water System, Domestic Water Cooler) N WATER SUPPLY SYSTEM PLUMPING Cold/Hot Water Pipes/Fittings (Fixture Sizing, Velocity, Friction Loss, Riser/Branch Sizing, Building Supply Sizing) CH.01 TABLE/CHART/FIGURE PAGE IN PDF HANDBOOK HANDBOOK R S SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE Water Supply Disinfection REFERENCE ITEM GENERAL DESCRIBTION Water Heater / WH (Installation/Clearances, Volume/Power Sizing, Materila, Insulation, Connection, Third Party Test Certificate) HANDBOOK CHAPTER.SECTION TABLE/CHART/FIGURE PAGE IN PDF HANDBOOK 2009 IPC / International Plumbing Code 502, 503, 504 … 52, 53 501.0-505.3 … 62 2009 UPC / Uniform Plumbing Code 2013 ASPE (Volume 2) / Plumbing System Hot Water Solar System … 122-128 … 52, 53 505.4-505.6 … 62, 63 CH.06 … 128-132, 135, 136 2009 UPC / Uniform Plumbing Code 2009 IPC / International Plumbing Code 501.2, 503.2, 424.3 … 49, 52 2013 ASPE (Volume 2) / Plumbing System CH.06 … 132-135 2004 CIBSE-Guide G / Public Health Engineering 2.4.7 … 18-32 2004 CIBSE-Guide G / Public Health Engineering 2.4.2 Fig 2.4 12 2013 ASPE (Volume 3) / Special Plumbing CH.10 … 210-223 2004 CIBSE-Guide G / Public Health Engineering 5.4.3.9 … 89, 90 Legionnaires’ Disease (Temperature, Heat And Flush, Copper-Silver Ionization, Chlorine Dioxide Gas Injection, Control Recommendations) 2013 ASPE (Volume 2) / Plumbing System CH.06 … 138-142 2004 CIBSE-Guide G / Public Health Engineering 2.5 … 21 Water Supply Pipes Pressure/Leak Test 2009 IPC / International Plumbing Code 312.5 … 36 Domestic Water Transfer/Feed/Lifting/House Pump (Pump PreCommissioning/Flow/Pressure/Power/Control, Pump CutIn/Off with Pressure Switch & Roof Tank Float Valve) Domestic Water Booster Pump (Pump Pre-Commissioning/Flow/Pressure/Power/Control, Pump CutIn/Off with Pressure Switch & Pressure Vessel) Pressure Reducing Valve (Pre-Setting, Pressure Measuring in Up-Stream & Down-Stream) Cooled Cold Water System For Ablution (Chilled Water PHEX PICV Pre-Setting With Tank Temperature Sensor, Domestic Water Cooler Pre-Commissioning / Temperature / Pressure / Power / Control) Electric Water Heater (Pre-Commissioning/Temperature/Pressure/Control/Power/Connection) Boiler/Calorifier (Pre-Commissioning/Temperature/Pressure/Control/Power/Connection) R R M Hot Water Return Circulation Pump (Pre-Commissioning/Flow/Pressure/Power/Control/DRV Setting) O WATER SUPPLY TESTING & COMMISSIONING CH.06 501, 504 2013 ASPE (Volume 2) / Plumbing System AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE Hot Water System Schematic N WATER SUPPLY SYSTEM PLUMPING Water Heater Safety/Control Devices (Pressure Relief Valve, Vacuum Relief Valve, Anti Siphone Devices, Design/Control Temperature, Combined Pressure/Temperature Relief Device, Drain) HOT WATER SYSTEM SIZING/DESIGN/INSTALLATION (WATER HEATER, RELIEF VALVE, CENTRAL HEATING, CALORIFIER, HEAT PUMP, H.W.RETURN CIRCULATION Hot Water Circulation (Supply, Return, Pump, Balancing, Heat Tracing, Calorifier, Thermostatic Mixing PUMP, HEAT TRACE, EXPANSION TANK, THERMOSTATIC Valve) MIXING VALVE, SOLAR SYSTEM, LEGIONNAIRES’ CIBSE Hot Water System (General) DISEASE) 2009 IPC / International Plumbing Code R S SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE REFERENCE ITEM DESCRIBTION GENERAL 122, 123 Table 7.2 117 CH.06 Table 6-1 126 3.3.9 Table 3.8 41 CH.06 … 125 2015 ISPSC / International Swimming Pool And Spa Code 306.5 Table 306.5 31 2013 ASPE (Volume 3) / Special Plumbing CH.06 … 127 117 2004 CIBSE-Guide G / Public Health Engineering 2013 ASPE (Volume 3) / Special Plumbing AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE 2013 ASPE (Volume 3) / Special Plumbing Swimming Pool Piping Sizing (Inlet, Suction, Circulation, Filtration) Swimming Pool Filtration/Circulation System (Filter Types/Applications, FlowRate) 2004 CIBSE-Guide G / Public Health Engineering 7.31 Table 7.1 2015 ISPSC / International Swimming Pool And Spa Code 407.2 Table 407.2 43 2015 ISPSC / International Swimming Pool And Spa Code CH.03 … 28-39 2004 CIBSE-Guide G / Public Health Engineering 7.4.2 … 120 2013 ASPE (Volume 3) / Special Plumbing CH.06 … 128, 129 2015 ISPSC / International Swimming Pool And Spa Code 311.3 … 33 2004 CIBSE-Guide G / Public Health Engineering 7.3 … 116-119 2013 ASPE (Volume 3) / Special Plumbing CH.06 … 128, 134-139 2004 CIBSE-Guide G / Public Health Engineering 7.4 … 2013 ASPE (Volume 3) / Special Plumbing CH.06 … 120-125 128-134, 139-145, 150, 151 2011 ASHRAE Application CH.05 … 62-65 Swimming Pool Chemical Treatment/Dosing (Disinfection, PH Control, TDS, Water Balance, Dosing Pump/Control, UV Light) 2004 CIBSE-Guide G / Public Health Engineering 7.5, 7.6 … 125-129, 134, 135 2013 ASPE (Volume 3) / Special Plumbing CH.06 … 145-149 Pool Site Component 2013 ASPE (Volume 3) / Special Plumbing CH.06 … 153, 154 2013 ASPE (Volume 3) / Special Plumbing CH.06 … 129-154 2004 CIBSE-Guide G / Public Health Engineering CH.07 … 118, 126 Swimming Pool Plumbing System (Piping, Pumps, Make-up Water, Balanced/Surge Tank, Main Drain/Grate, Gutter/Skimmer, Circulation, Heating, Wave Machine, Sensors/Control) Swimming Pool HVAC System (Natatoriums, Environmental Control, Humidity Control, Load Estimation, Ventilation Requirements, Duct Design, Envelope Design, Pool Water Chemistry, Energy Considerations, Design Concepts, Occupancy, Equipment/Maintenance, Air Cleanliness, System Applicability) Swimming Pool Schematic/Typical Details (Main Drain Sump with Hydrostatic Relief Valve, Typical Above-Grade Piping Scheme, Typical Below-Grade Piping Scheme, Deck-Level Surge Gutter Trench, Skimmer Detail, Three-Tank Horizontal High-Rate Sand Filtration System, Vacuum DE Filter Piping, Regenerative DE Filter, Flow Control Valves, Differential Pressure Controller Detail, Ozone System Piping, Handicapped Access, Typical Pressure Sand Medium/High Rate Filters, Typical Swimming Pool Water Treatment Plant Layout) 2004 CIBSE-Guide G / Public Health Engineering 8.1.1 … 136 2004 CIBSE-Guide G / Public Health Engineering 8.2 … 136-138 Water Features Design Considerations (Location Of Displays/Planning, Fountain Display Characteristics) 2004 CIBSE-Guide G / Public Health Engineering 8.3 … 137, 138 Water Features Care/Treatment/Cleaning (Need For Treatment, Treatment Methods, Pool Cleaning) 2004 CIBSE-Guide G / Public Health Engineering 8.4 … 138-140 Water Features Components (Basins/Reservoirs, Pool Waterproofing, Pumps, Plant Space/Location, Distribution Systems, Nozzles/Jets, Puddle Flanges, Suction Strainers, Valves, Overflow Drains, Floor Drains, Inflow/Water Make-Up, Water Heating, Power/Controls) 2004 CIBSE-Guide G / Public Health Engineering 8.5 … 140-144 Water Features Sample Calculations (Example 1/2/3/4, Water Demand Charts) 2004 CIBSE-Guide G / Public Health Engineering 8.7 … 144, 146 Fountain Equipment Locating (Using The Building’s Mechanical Area, Using Subterranean Vault) 2013 ASPE (Volume 3) / Special Plumbing CH.05 … 114-116 Fountain Display Pump Sizing (Flow Rate, Head, Length Of The Weir Opening) 2013 ASPE (Volume 3) / Special Plumbing CH.05 … 116 Fountain (Safety, Codes/Standards, Materials, System Devices, Conclusion) 2013 ASPE (Volume 3) / Special Plumbing CH.05 … 116-118 Soil Consideration (Water Requirements Of Plants, Soil Moisture, Infiltration Rate, Drainage, Response To Irrigation, Water Quality, Quick-Coupling Valve, Block System, Valve-in-Head System) 2004 CIBSE-Guide G / Public Health Engineering 9.2 … 147-149 2013 ASPE (Volume 3) / Special Plumbing CH.04 … 106, 107 Irrigation Water (Water Supply Sources, Storage Of Irrigation Water, Irrigation Water Quality, Prevention Of Cross-Connections) 2004 CIBSE-Guide G / Public Health Engineering 9.3 … 149-151 Irrigation Systems Types (Furrow Method, Hose Method, Automatic Systems, Sprinkler Systems, Drip Systems, Bubbler Systems, Sports Field Sprinkler Systems, Capillary Systems, Sub-Soil Systems) 2004 CIBSE-Guide G / Public Health Engineering 9.4 … 151-154 2004 CIBSE-Guide G / Public Health Engineering 9.5 … 154-158 2013 ASPE (Volume 3) / Special Plumbing CH.04 … 108-110 Methods Of Irrigation Control (Electrical Controls, Hydraulic Or Pneumatic Controls) 2013 ASPE (Volume 3) / Special Plumbing 9.6 … 158, 159 Irrigation Systems Design Information (Site Plan, Types Of Plants, Type Of Soil, Type And Source Of Water, System Location) 2013 ASPE (Volume 3) / Special Plumbing CH.04 … 110, 111 R R M Types Of Display (Natural Effect, Statuary, Water Jets) Water Features Types (Small Fountains, Sculpture Displays, Large Fountains, Watercourse Installations, Waterfalls) O SWIMMING POOL / FOUNTAINS Irrigation Equipment (Storage Tanks/Ponds, Automatic Pumps, Media Pressure Filters, Particle Filtration, Water Meters, Solenoid Control Valves, Valves/Accessories, Sprinklers/Sprays, Mist Sprays, Bubblers, Emitters, Trickle Irrigation, Backflow Preventors, Water Metering, Rain Shutoff Device, Controllers, Pipelines, Control Cables) N LANDSCAPE / IRRIGATION PLUMPING … 7.2 Minimum Required Sanitary Fixture Units For Swimming Pools (Male/Female, No Of Changing Places, Facility Location/Type/Area) Third Party Test Certification (Piping/Fittings/Joints, Filters, Pumps/Motors, Reservior/Shell, Skimmer, Heater, Air Blower/Induction) IRRIGATION CH.06 2013 ASPE (Volume 3) / Special Plumbing 2004 CIBSE-Guide G / Public Health Engineering Swimming Pools TurnOver Rates (Pool Type/Classes, Times/Hours Per Hour/Day) FOUNTAINS / REFLECTING POOLS / WATER FEATURES PAGE IN PDF HANDBOOK CHAPTER.SECTION Occupant Capacity For Swimming Pools (Depth Range/Surface Area Per Person, Percentage Of Total Occupant/Peak Day) Slope For Swimming Pools Deck/Surface SWIMMING POOLS / SPA TABLE/CHART/FIGURE HANDBOOK R S SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE REFERENCE ITEM TABLE/CHART/FIGURE PAGE IN PDF HANDBOOK CH.07 … 156-158 CH.07 … 158-167 2013 ASPE (Volume 3) / Special Plumbing CH.07 … 168-171 2013 ASPE (Volume 3) / Special Plumbing CH.07 … 171, 172 2013 ASPE (Volume 3) / Special Plumbing CH.07 … 173, 174 2013 ASPE (Volume 3) / Special Plumbing CH.07 … 174-176 Gas System General (Definitions, Appliance Fuel Connector, Bonding Jumper, Fuel Gas, Gas Piping, GasPiping System, Grounding Electrode, LPG Facilities, Provision For Location Of Point Of Delivery, QuickDisconnect Device, Service Piping, Transition Gas Riser, Inspection, Certificate Of Inspection, Authority To Render Gas Service, Authority To Disconnect, Temporary Use Of Gas) 2009 UPC / Uniform Plumbing Code 1201-1208 … 187-189 Gas System Design (Piping Plan, Provision For Location Of Point Of Delivery, Interconnections Between Gas-Piping Systems, Sizing Of Gas-Piping Systems, Acceptable Piping Materials And Joining Methods, Approximate Gas Input For Typical Appliances, Specifications For Threading Metallic Pipe, Gas Meters, Gas Pressure Regulators, Back-Pressure Protection, Low-Pressure Protection, Shutoff Valves, Expansion And Flexibility, Excess Flow Valve) 2009 UPC / Uniform Plumbing Code 1209, 1210 … 189-196 Gas System Installation (Gas Piping Installation, Piping Underground, Installation Of Piping, Support Of Piping, Concealed Piping In Buildings, Piping In Vertical Chases, Maximum Design Operating Pressure, Appliance Over Pressure Protection, Gas Pipe Turns, Drips/Sediment Traps, Outlets, Branch Pipe Connection, Manual Gas Shutoff Valves, Prohibited Devices, Systems Containing Gas-Air Mixtures Outside The Flammable Range, Systems Containing Flammable Gas-Air Mixtures, Electrical Bonding/Grounding, Electrical Circuits, Electrical Connections) 2009 UPC / Uniform Plumbing Code 1211 … 196-201 2009 UPC / Uniform Plumbing Code 1212 … 201-203 2009 UPC / Uniform Plumbing Code 1214 … 203-205 2009 UPC / Uniform Plumbing Code 1215 … 205 2009 UPC / Uniform Plumbing Code 1216, 1217 … 205-207 2009 UPC / Uniform Plumbing Code CH.12 … 208-236 2013 ASPE (Volume 3) / Special Plumbing AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE Fuel AboveGround Tank (Construction, Connection, Access, Spill Prevention, Atmospheric Tank Venting, Overfill Prevention, Leakage From Tank, System Monitoring, Vapor Recovery System, Product Dispensing System, Tank Protection) Fuel Piping/Pump System (Material, Sizing, Flow Rate, Friction Loss, Head Calculation) Fuel System Test (System Head Loss Checklist, Testing Of The Storage Tank, Testing Of The Piping Network, Tightness Testing) Fuel Tank Installation (Installation Checklist, Tank Removal And Abandonment) Gas System Appliances (Appliance Connections To Building Piping, Connecting Gas Appliances, Suspended Low-Intensity Infrared Tube Heaters, Use Of Nonmetallic Gas Hose Connectors, Connection Of Portable And Mobile Industrial Gas Appliance, Appliance Shutoff Valves And Connections, QuickDisconnect Devices, Sediment Trap, Installation Of Piping) Gas System Pressure Testing/Inspection (General, Test Preparation, Test Pressure, Detection Of Leaks/Defects, Piping Systems Leak Check, Purging) Gas System Interconnections Between Gas Piping (Interconnections Supplying Separate Users, Interconnections For Standby Fuels) Required Gas System (Required Gas Supply, Required Gas Piping Size, Pipe Sizing Methods, Longest Length Method, Branch Length Method, Hybrid Pressure, Tables For Sizing GaS-Piping Systems, Sizing Equations, High-Pressure Gas Formula, Cr/Y Values) R M Gas System Schematic & Tables (Example Illustrating Use of Tables 12-1 and 12-8, Schedule 40 Metallic Pipe, Semi-Rigid Copper Tubing, Corrugated Stainless Steel Tubing/CSST, Polyethylene Plastic Pipe) R LPG/LNG 2013 ASPE (Volume 3) / Special Plumbing O FUEL / GAS GASOLINE / DIESEL OIL Fuel System (Terminology, Classification, Tanks Types, Pressures, Flammable/Combustible Liquid Classifications, Third Party Test Certificates, Components) Fuel UnderGround Storage Tank (Material, Construction, Connection, Access, Filling, Atmospheric Tank Venting, Leak Detection, System Monitoring, Vapor Recovery System, Dispensing System) CHAPTER.SECTION R S HANDBOOK GENERAL PLUMPING DESCRIBTION N SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE REFERENCE ITEM DESCRIBTION Steam System Basics (Specific Volume Of Saturated Steam, Flash Steam, Properties Of Saturated Steam, Flash Steam Formation Data) Steam Distribution Piping (Steam Velocity, Pressure Drop, Erosion In Steam Distribution Systems, Relationship Of Mass Flow Rate/Velocity/Pressure Drop, Velocity Multiplier Chart, Flow Rate/Velocity Of Steam In Schedule 40 Pipe) HEALTH CARE FACILITIES (VACUUM & MEDICAL GAS) COMPRESSED AIR SPECIAL REQUIREMENTS HEALTH CARE FACILITIES MEDICAL VACUUM / MEDICAL GAS METHOD OF STATEMENT FOR INSTALLATION, TESTING & COMMISSIONING OF PLUMBING PAGE IN PDF HANDBOOK CH.08 … 178-180 CH.08 … 180-183 CH.08 … 183, 184 2013 ASPE (Volume 3) / Special Plumbing CH.09 … 192, 193 2013 ASPE (Volume 3) / Special Plumbing CH.09 … 193, 194 2013 ASPE (Volume 3) / Special Plumbing Compressed Air System Contaminant (Liquids, Vapor, Gases, Particulates, Use Factor) 2013 ASPE (Volume 3) / Special Plumbing CH.09 … 194, 195 Compressed Air System Components (Air Compressor, Piping, Joints, Valves, Flow Meters, Compressed Air Receivers, Aftercoolers, Separators, Compressed Air Dryers, Regulators, Filters And Purifiers, Relief Valves, Hoses And Fittings, Alarms, Compressor Inlet Piping, Vibration Isolation) 2013 ASPE (Volume 3) / Special Plumbing CH.09 … 195-202 Compressed Air System Design (Recommended Pipe/System Sizing, Equivalent Pressure Losses Through Valves/Fittings, General Air Requirements For Tools, High-Pressure Compressed Air Friction Loss For Schedule 40 Steel Pipe, Friction Losses For Hoses, Flushing, Testing, Glossary, Factors For The Sizing Of Any Gas Based On Specific Gravity) 2013 ASPE (Volume 3) / Special Plumbing CH.09 … 202-209 Health Care Facilities Plumbing Requirements (Application, Medical Gas and Vacuum Piping Systems Installation Requirements, Protrusions From Walls, Psychiatric Patient Rooms, Locations For Ice Storage, Sterillizers, Indirect Waste Connections, Vapor Vents And Stacks For Sterillizers, Aspirators) 2009 UPC / Uniform Plumbing Code 1301-1308 … 237, 238 Health Care Facilities Plumbing (Codes/Standards, Health Care Facilities Types/ Classifications/Catagories) 2013 ASPE (Volume 3) / Special Plumbing CH.02 … 54, 55 Health Care Facilities Fixture Units (Recommended Plumbing Fixtures And Related Equipment For Healthcare Facilities, Hospital Plumbing Fixture Values, Fixtures For General Use In Staff And Public Areas, Fixtures For Patient And Treatment Rooms, Fixtures For Kitchens And Laundries, Decontamination Area Fixtures, Fixtures For Laboratory Rooms) 2013 ASPE (Volume 3) / Special Plumbing CH.02 … 56-63 Medical Gas/Vacuum System (Applications, Definitions, Requirements, Plan Review., Required Operating Pressures, Minimum Flow Rates, Minimum Station Outlets/Inlets, Required Pipe Sizing, Workmanship) 2009 UPC / Uniform Plumbing Code 1309-1315 … 238-241 Medical Gas/Vacuum System (Materials, Cleaning For Medical Gas Piping Systems, Installation Of Piping, Joints, Valves Requirements/Locations/Labeling, Pressure-Regulating Equipment, Pressure Gauges, Station Outlets/lnlets, Labeling/Identification, Alarms, Medical Air System, Medical Air Receivers, Medical Vacuum Pump System, Testing/Inspection, Testing Standing Pressure, System Certification) 2009 UPC / Uniform Plumbing Code 1316-1328 … 242-254 Medical Gas/Vacuum System Tables (Standard Designation Colors And Operating Pressures For Gas And Vacuum Systems, Minimum Flow Rates, Minimum Outlets/Inlets Per Station, System Sizing - Flow Requirements For Station Inlet/Outlet, Outlet Rating For Vacuum Piping Systems, Size Of Gas/Vacuum Piping, Maximum Pipe Support Spacing) 2009 UPC / Uniform Plumbing Code CH.13 … 255-258 https://safeworkmethodofstatement.com R R 2009 ASHRAE 189 2013 ASPE (Volume 4) / Plumbing Equipment / CH.14 O GREEN PLUMBING 2013 ASPE (Volume 3) / Special Plumbing Steam Condensate Removal (Steam Traps) Compressed Air System (Code/Standard, Fundamental, General Composition Of Dry Air, Elevation Correction Factors, Temperature Correction Factors) Compressed Air System Measurements Units (Pressure, Flow Rate, Relationship Between Gauge/Absolute Pressure, Water Vapor In Air) N PLUMPING STEAM / AIR STEAM 2013 ASPE (Volume 3) / Special Plumbing AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE GENERAL TABLE/CHART/FIGURE CHAPTER.SECTION R S HANDBOOK M SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE REFERENCE ITEM DESCRIBTION HANDBOOK GENERAL 2018 NFPA 101 / Life Safety Code Fire Classifications 2018 NFPA 1 / Fire Code Buildings Classifications 2018 NFPA 101 / Life Safety Code Occupancy / # Of People In Buildings/Spaces 2018 NFPA 101 / Life Safety Code Hazard Classifications 2016 NFPA 13 / Installation Of Sprinkler Systems AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE AUTOMATIC SPRINKLER SYSTEM COMPONENTS NFPA Codes Summary PAGE IN PDF HANDBOOK 2.2 … 27, 28 3.3.117 … 41 A.3.3.196 … 391-393 7.3.1 Table 7.3.1.2 84 A.5.2-A.5.4 … 298, 299 Automatic Sprinkler System Rated Pressure 2016 NFPA 13 / Installation Of Sprinkler Systems 6.1.3 … 32 2016 NFPA 13 / Installation Of Sprinkler Systems 6.2 … 32-34 Automatic Sprinkler (Pipes/Fittings Material, Joining Method, Third Party Test Certificate) 2016 NFPA 13 / Installation Of Sprinkler Systems 6.3-6.5 … 34-39 Automatic Sprinkler (Valves, Fire Department Connection, Water Flow Alarm/Detection) 2016 NFPA 13 / Installation Of Sprinkler Systems 6.6-6.8 … 39, 40 Wet Pipe System (Pressure Gauges, Relief Valves, Auxiliary Systems, Air Venting) 2016 NFPA 13 / Installation Of Sprinkler Systems 7.1 … 40 Dry Pipe System (Pressure Gauges, Sprinklers, Size Of System, Water Delivery, Quick Opening Devices, Antiflooding Devices, Dry Valve Location/Protection, Air Pressure/Supply, Nitrogen Or Approved Gas) 2016 NFPA 13 / Installation Of Sprinkler Systems 7.2 … 40-42 2016 NFPA 13 / Installation Of Sprinkler Systems 7.3.1 … 42 2016 NFPA 13 / Installation Of Sprinkler Systems 7.3.2 … 43 Deluge System 2016 NFPA 13 / Installation Of Sprinkler Systems 7.3.3 … 43, 44 Combined Preaction/Dry Pipe System (General, Sprinklers, Dry Pipe Valves, Subdivision Of System Using Check Valve, Time Limitation, System Test Connection) 2016 NFPA 13 / Installation Of Sprinkler Systems 7.4 … 44 2016 NFPA 13 / Installation Of Sprinkler Systems 7.6 … 44-46 2016 NFPA 13 / Installation Of Sprinkler Systems 7.7 … 46, 47 2016 NFPA 13 / Installation Of Sprinkler Systems 7.8 … 47-49 2016 NFPA 13 / Installation Of Sprinkler Systems 7.9 … 49, 50 Preaction/Deluge System (Pressure Gauges, Releasing Devices Location/Spacing, Control Valve Location/Protection) Preaction System (Types, Sizing, Supervision, Sprinklers, Configration) AUTOMATIC SPRINKLER SYSTEM TYPES/REQUIREMENTS TABLE/CHART/FIGURE Automatic Sprinkler (General, Identification, K-Factor, Occupancy, Temperature Rating/Classification, Color Code, Glass Bulb Color, Corrosion, Painting, Spare Sprinkler) AntiFreeze System (General, Solutions, Pipes/Valves Arrangement) Outside Sprinklers Against Exposure Fires (Applications, Water Supply/Control, Components, Pipe/Fitting, Sprinklers Types) Refrigerated Spaces Sprinklers (Temperature, Pressure, Air/Nitrogen, Control/Check Valves, Fire Detection/Preaction Release) O R R M Commercial Cooking Equipment Sprinklers (General, Automatic Spray Nozzle Location/Temperature/Access, Cooking Equipment, Indicating Valve, Strainers, Additives/Coating) N AUTOMATIC SPRINKLER SYSTEM FIRE FIGHTING CLASSIFICATIONS / BUILDING REQUIREMENT / GENERAL CHAPTER.SECTION R S SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE REFERENCE ITEM DESCRIBTION AUTOMATIC SPRINKLER SYSTEM INSTALLATIONS REQUIREMENTS TABLE/CHART/FIGURE PAGE IN PDF HANDBOOK 8.2 … 50, 51 8.3, 8.4 … 51-55 8.5 … 55-57 2016 NFPA 13 / Installation Of Sprinkler Systems 8.6 … 57-65 Automatic Sprinkler System (Protection Area Limitation, Zone Control Valves, Detached Building) 2016 NFPA 13 / Installation Of Sprinkler Systems Sprinkler (Protective Caps/Straps, Temperature Rating/Distance From Heat Source, Thermal Sensitivity, Sprinkler In Specified Locations, Application Of Sprinklers) 2016 NFPA 13 / Installation Of Sprinkler Systems Sprinkler (Position, Spacing, Location, Obstruction Of Sprinkler Discharge, Skylight) Upright/Pendent Standard Spray Sprinkler (Protection/Coverage Area, Spacing Between Sprinklers/From Wall, Distance Above/Below Ceiling, Sprinklers In Peaked Roof/Ceiling, In Obstructed Construction, ClearanceTo Storage, Ceiling Pocket) Sidewall Spray Sprinkler 2016 NFPA 13 / Installation Of Sprinkler Systems 2016 NFPA 13 / Installation Of Sprinkler Systems 8.7 … 65-69 Extended Coverage Spray Upright/Pendent Sprinkler 2016 NFPA 13 / Installation Of Sprinkler Systems 8.8 … 69-74 Extended Coverage Sidewall Spray Sprinkler 2016 NFPA 13 / Installation Of Sprinkler Systems 8.9 … 74-78 Residential Sprinklers 2016 NFPA 13 / Installation Of Sprinkler Systems 8.10 … 78-85 CMSA Sprinkler 2016 NFPA 13 / Installation Of Sprinkler Systems 8.11 … 85-88 ESFR (Early Supression Fast-Response) Sprinkler 2016 NFPA 13 / Installation Of Sprinkler Systems 8.12 … 88-91 In-Rack Sprinkler 2016 NFPA 13 / Installation Of Sprinkler Systems 8.13 … 91 Pilot Line Detector 2016 NFPA 13 / Installation Of Sprinkler Systems 8.14 … 91, 92 Sprinkler Special Situations (Concealed, Vertical Shaft, StairWays, Vertical Opening, Elevator Hoistway/Machine Room, Spaces UnderGround Floor/Exterior Dock/Platform, Exterior Projection, Bathroom, Closets/Pantries, Hospital Clothes Closets, Library Stack Area/Record Storage, Electrical Equipment, Industrial Oven/Furnaces, Duct Protection, Open-Grid Ceiling, Drop-Out Ceiling/Ceiling Material, Old Style Sprinkler, Stages, Stair Towers, Return Bend, Piping To Sprinkler Below Ceiling) 2016 NFPA 13 / Installation Of Sprinkler Systems 8.15 … 92-99 Sprinkler Control Valves (As Supervision, With Check Valves, For Gravity Tank, For Pump, Accessibility, Identification) 2016 NFPA 13 / Installation Of Sprinkler Systems 8.16.1.1 … 99, 100 Sprinkler PRV/Pressure Reducing Valve (Pressure Limits, P.Gauge Installation, Relief Valves) 2016 NFPA 13 / Installation Of Sprinkler Systems 8.16.1.2 … 100 Sprinklers System Valves (Post-Indicator Valves, Valves In Pits, In Rack Control Valve) 2016 NFPA 13 / Installation Of Sprinkler Systems 8.16.1.3 - 8.16.1.5 … 100 Sprinklers Drainage System (Wet Pipe, Dry Pipe, Preaction, Main/Riser Drain, Sectional Drain Connection, Auxiliary Drain, Discharge Of Drain Valve) 2016 NFPA 13 / Installation Of Sprinkler Systems 8.16.2 … 100-102 Sprinkler System Provision Of Flushing (Readily Removable Fittings, Cross Main/Larger Pipe) 2016 NFPA 13 / Installation Of Sprinkler Systems 8.16.3 … 102 Sprinkler Piping Protection (Against Freezing, Against Corrosion, In Hazardous Areas, Risers Subject To Mechanical Damage) 2016 NFPA 13 / Installation Of Sprinkler Systems 8.16.4, 8.16.5 … 102 Sprinkler Alarms/WaterFlow Alarms/Alarm Check Valve (Local Alarm, Retarding Device, Bypass Test Connection, Indicating Control Valve, Mechanically Operated, High Rise Building, In Rack System) 2016 NFPA 13 / Installation Of Sprinkler Systems 8.17.1, A-C.4 … 102, 103 2016 NFPA 13 / Installation Of Sprinkler Systems 8.17.2 … 103, 104 2016 NFPA 13 / Installation Of Sprinkler Systems 8.17.3 … 104 Sprinkler Test Connection (Wet Pipe, Dry Pipe, Preaction, Deluge, Backflow Device) 2016 NFPA 13 / Installation Of Sprinkler Systems 8.17.4 … 104, 105 Sprinkler Hose Connection (Small Hose Connection, Fire Department Hose Connection) 2016 NFPA 13 / Installation Of Sprinkler Systems 8.17.5, A-C.5 … 105 A-A Table A.6.9 322 2016 NFPA 13 / Installation Of Sprinkler Systems A-A Table A.6.1.1 316 2016 NFPA 13 / Installation Of Sprinkler Systems A.10.10.2.2.1 … 381 2016 NFPA 13 / Installation Of Sprinkler Systems CH.10 … 135-143 M Fire Department Connection (Required/Not-Required Buildings, Sizing, Arrangment, Signs, Valves, Drainage) Sprinkler Gauges (Location, Sizing, Valves, Pressure Limits) O R R Sprinkler System Signage Summary Sprinkler System Third Party Test Certificates (Sprinklers, Under Ground/Above Ground Pipes, Valves, Hangers, Fittings) Sprinkler System Hydrostatic Test Sprinklers System UnderGround Piping (Piping, Fitting, Joining/Connection, Protective, Grounding/Bonding, Thrust Block, Steep Grades, Backfilling, Testing) N AUTOMATIC SPRINKLER SYSTEM FIRE FIGHTING GENERAL CHAPTER.SECTION R S HANDBOOK AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE REFERENCE ITEM DESCRIBTION … 106-112 9.2 … 112-116 2016 NFPA 13 / Installation Of Sprinkler Systems 9.3 … 116-135 2016 NFPA 13 / Installation Of Sprinkler Systems 11.1.2 … 143, 144 2016 NFPA 13 / Installation Of Sprinkler Systems 11.1.6, 11.1.7 … 144 2016 NFPA 13 / Installation Of Sprinkler Systems 11.2.1, 11.2.2 … 144, 145 2016 NFPA 13 / Installation Of Sprinkler Systems 11.2.3 … 145-148 Special Design (Residential Sprinkler, Exposure Protection, Water Curtain, Sprinklers Under Roof Or Ceiling In Combustible Concealed Spaces Of Wood Joist Or Wood Truss Construction With Members 3 Ft/0.9 m Or Less On Center And Slope Having Pitch Of 4 in 12 Or Greater, Sprinkler-Protected Glazing) 2016 NFPA 13 / Installation Of Sprinkler Systems 11.3 … 148 Sprinkler System Design For Storage (Height, Clearance, Storage Applications, Discharge Consideration, Multiple Hazard/Adjustment Classifications, Unsprinklered Combustible Concealed Spaces, Hose Stream Allownce, Water Supply, Duration) 2016 NFPA 13 / Installation Of Sprinkler Systems CH.12 … 149-156 Sprinkler System Hydraulic Calculation (Friction Loss, Equivalent Pipe Length Of Valves/Fittings, Adjustment/Hazen Williams C-Value, Design Area, Pipe Sizing, Minimum/Discharge K-Factor, Application Rate Per Linear/Surface/Lineal Meter) 2016 NFPA 13 / Installation Of Sprinkler Systems 23.4-23.7 … 267-273 Sprinkler System Schematics/Typical Details (Gridded/Looped System, Building Elevation, Typical Private Fire Service Main, Back To Back Shelf Storage, Manifold Arrangement/Four Sprinklers, Typical Combined Dry/Preaction, Header For Dry Pipe Valve Installed In Parallel For Combined, Typical/Alternate Arrangement Of Check Valve, Refrigerator Area Sprinkler, Sprinkler In Corridor/Shadow Area, Dry Sidewall Sprinkler, Maximum Distance From Wall, 1/2/3/4 Sprinklers In Small Room, Sprinkler Above Ceiling, Obstructions, Elevation Change, ESFR, Flange Joints, Valve Arrangement, Valve Pit/Chamber, Pressure Gauge Location, Water Supply Test Connection, Fire Depaqrtment Connection, City Water Pit/Champer, Sprinkler/StandPipe Combined) 2016 NFPA 13 / Installation Of Sprinkler Systems A-A … 286, 287, 290, 291, 323325, 327, 328, 330-352 StandPipe (Pipe, Fitting, Welding/Groove/Braze Joining Method, Valves, Hose Station, Hose Connection, Fire Department Connection, Pressure Regulating Device, Third Party Test Certificate) 2016 NFPA 14 / Installation Of StandPipe & Hose Systems CH.04 … 13-16 2016 NFPA 14 / Installation Of StandPipe & Hose Systems 5.1, 5.2 … 17, 18 2016 NFPA 14 / Installation Of StandPipe & Hose Systems 5.3, 5.4 … 18, 19 StandPipe (Gauges, PRV, Waterflow & Supervisory Alarms) 2016 NFPA 14 / Installation Of StandPipe & Hose Systems 5.5, 5.6 … 19 2016 NFPA 14 / Installation Of StandPipe & Hose Systems CH.06 … 19-22 2016 NFPA 14 / Installation Of StandPipe & Hose Systems CH.07 … 22-26 2016 NFPA 14 / Installation Of StandPipe & Hose Systems CH.08 … 27, 28 2016 NFPA 14 / Installation Of StandPipe & Hose Systems A-A … 39-45 AUTOMATIC SPRINKLER SYSTEM DESIGN STANDPIPE SYSTEM COMPONENTS / INSTALLATION REQUIREMENTS StandPipe (Pressure Gauge Location, System Volume Limitation, Air Pressure/Supply, Relief Valve, Automatic Air Maintenance, System Air Pressure, Semiautomatic Dry, Control Valve Location/Protection) StandPipe (Class I, Class II, Class III) StandPipe Installation (Location Of Dry StandPipe, Protection Of Above Ground Piping, UnderGround Piping, Gate Valve, Check Valve, Supervisory Valve, Fire Department Connection, Support Of Piping, Signs Installation, Signs Of Water Supply Pumps, Hydraulic Design Information Sign) R R StandPipe System Design (Pressure Limitation/PRV, Location Of Hose Connection, Number Of StandPipes, Travel Distance, Interconnection Of StandPipe, Minimum Sizes For StandPipes/Branch Lines / Delivery Line Class I/III, Max/Min Pressure, Flow Rate, Building Protected Area, Hydraulic Calculation, Drain/Test Riser, Fire Department Connection) StandPipe System (Friction Loss, Equivalent Pipe Length Of Valves / Fittings, Adjustment/Hazen Williams C-Value) StandPipe Schematics/Typical Details (Combined, Fire Department, Single Zone, Two Zone, MultiZone, Vertically Staged Pumps For Two Zone, Dual Pressure Regulating Device, Hose Connection In Stairwells/Horizontal Exits/Exit PassageWay/Open Stair/Corridor/BreezeWays) O STANDPIPE SYSTEM DESIGN 2016 NFPA 13 / Installation Of Sprinkler Systems R S 2016 NFPA 13 / Installation Of Sprinkler Systems CHAPTER.SECTION AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE Hanger Installation (Ceiling Sheathing, Storage Racks, Building Structure, Flexible Sprinkler Hose Fittings, Metal Deck, Hangers Spacing/Qty, Hanger Clearance, Unsupported Length, Hanger Location On Main/Branch Line, Riser Support, Multistories Building, Pipe Stand, Sizing, Bracket, Thrust, Exterior Application) Piping Protection Against Earthquakes/Expansion Joints (Obstruction, Coupling, Seismic Separation, Clearance, Sway Bracing, Restraint Of Branch Line, Hangers/Fasteners For Earthquake, Pipe Stand For Earthquake) Sprinklers Adjacent Hazards (Two Or More Adjacent Hazards) Sprinklers Hose Allownce/HVLS (Multiple Hazard, Outside Hose/Hydrant, Inside Hose/Class I/II/Combined, HVLS Fans) Water Demand (Occupancy Hazard, Pipe Schedule Method Flow/Residual Pressure/Duration, Friction Loss Due To Backflow Preventer Valve) Hydraulic Calculation Methods (Sprinklers Operation-Remote Area/ Unsprinklered Combustible Concealed Spaces/Hose Stream Allownce, Density-Area Method Quick Response Sprinkler / Sloped Ceiling / Dry Pipe / Double Interlock Preaction / High Temperature Sprinkler / Multiple Adjustments, Room Design Method, Special Design Areas) N AUTOMATIC SPRINKLER SYSTEM 9.1 Hangers (Weights, Material, Trapeze Hanger/Angle, Hanger Rod, Fasteners In Concrete/Steel/Wood) AUTOMATIC SPRINKLER PIPING SYSTEM HANGER/SUPPORT/BRACING/RESTRAINT STANDPIPE & HOSE SYSTEM PAGE IN PDF HANDBOOK HANDBOOK GENERAL FIRE FIGHTING TABLE/CHART/FIGURE M SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE REFERENCE ITEM DESCRIBTION HANDBOOK Fire Pump (Capacity, Pressure Gauge, Circulation Relief Valve, Equipment Protection / Access / Heat/Lighting/Ventilation/Drainage/Gaurds) Fire Pump Suction (Pipe, Fittings, Sizing, ByPass, Valves, Freeze Protection, Elbows/Tees, Eccentric Tapered Reducer/Increaser, Strain Relief, Multiple Pumps, Suction Screening, Check Valve, Suction Diffuser) GENERAL Fire Pump (Valve Supervision, Protection Of Pipes Against Damage Due To Movment, Relief Valve Size/Location/Type/Discharge/Discharge Piping/Shutoff Valve, Series Arrangement, Water Flow Test Device, Hose Valve Thread Type/Location/Pipe Size, Steam Power Supply Dependability, Shop Test, Pump Shaft Rotation) Pressure Maintenance/Jockey/Make-Up Pump (Definition, Pump Type, Non Listed, Capacity, Discharge Pressure, Excess Pressure, Piping, Valves, Control, Power Supply) Fire Pump (Centrifugal Pump Data, Back Flow Preventer/Check Valve, Relief Valve Drainage, EarthQuake Protection, Packaged Fire Pump Set Specs, Pressure Actuated Control/Pressure Sensing Line, CheckValve/Ground Face Unions, Shutoff Valve, Pressure Switch Actuation, Breal Tanks, Site Acceptance Test) Fire Pump For High Rise Building (Application, Equipment Access, Water Supply Tank, Test Arrangment, Auxiliary Power, Very Tall Building, Fire Pump Backup) Centrifugal Fire Pump (Type, Application, Factory/Field Performance, Fittings, Automatic Air Release, Foundation/Setting, Connection To Driver And Alignment, Coupling Type) Vertical Turbine Pump (Application, Factory/Field Performance, Water Supply Source, Pump Submergence, Vertical Turbine Pump Head Component, Column, Bowl Assembly, Suction Strainer, Fittings, Automatic Air Release, Water Level Detection, Pump House, Outdoor Setting, Foundation, Sump/Pit, Method Of Drive, Mass Elastic System, Gear Drive, Flexible Connecting Shafts, VFD, Operation/Maintenance) Positive Displacement Pump (Type, Suitability, Application, Pump Seal, Pump Material, Dump Valve/Valve Control, Foam Concentration/Additive Pump, Water Mist System Pump, Water Mist Positive Displacement Pumping Units, Fittings, Pump Driver, Controller, Foundation / Setting, Driver Connection/Alignment, Flow Test Devices) Electric Driver/Motor (Interruption, Normal Power, Overcurrent Device Selection, Alternate Power, Other Source, Tow Or More Alternate Sources, Voltage Drop, Motors, VFD Motor, Motor For Vertical Turbine Pump, Current Limits, Marking, On-Site Standby Generator System Capacity/Power Source/Sequencing/Transfer Of Power/Protective Device, Junction Box, Listed Electrical Circuit Protective System To Controller Wiring, Raceway Termination) Electric Driver/Motor Controller And Accessories (Application, Performacing/Testing, Marking, Preshipment, Service Equipment Listing, Additional Marking, Service Arrangement, State Of Readiness, Location, Construction, Enclosure, Connecting/Wiring, Protection Of Control Circuit, External Operation, Electrical Diagram And Instruction, Marking, Voltage Surge Arrestor, Isolating Switch, Mechanical/Electrical Characteristics, VFD) Diesel Engine Drive (Engine Type/Rating/Power/Control, ECM, Variable Speed, Pressure Sensing Line, Overspeed, Instrumentation, Wiring, Batteries, Air Starting, Engine Cooling, Heat Exchanger, Automatic Valve, Pump Room Extract/Mackup Ventilation, Fuel System) Diesel Engine Drive Controller And Accessories (Application, Marking, Location, Construction, Enclosure, Connecting/Wiring, Components, Battery Recharching, Battery Charger, Starting/Control, AirStarting Engine Control) PAGE IN PDF HANDBOOK 4.9-4.13 … 21 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection 4.15 … 21-23 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection 4.16 … 23 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection 4.17-4.24 … 23-26 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection 4.26 … 26, 27 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection 4.27-4.33 … 27-30 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection CH.05 … 30 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection CH.06 … 31 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection CH.07 … 31-35 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection CH.08 … 35-37 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection CH.09 … 37-41 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection CH.10 … 41-51 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection CH.11 … 51-60 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection CH.12 … 60-65 Pressure Relief Valve Calculation / Discharge To Atmosphere 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection A.4 Fig.A.4.19.2.1 76 Pump Test Header Size Calculation 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection A.4 Fig,A.4.21.3.4 (2) 79 Pump Performance Curve 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection A.6 Fig.A.6.2 87 Positive Displacement Pump Selection 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection A.8 Fig.A.8.1.2.2 M FIRE PUMP & MOTOR/DRIVE TYPES/SPECS FIRE PUMP CALCULATION/CHART/TEST/INSPECTION/TROUBLESHO OT FORMS 91 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection A.11 Fig.A.11.2.2.4, Fig.A.11.2.2.5 98, 99 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection A.14 Fig.A.14.1.3 (a), (b) 105-108 Centrifugal Fire Pump Acceptance Test Forms 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection A.14 Fig.A.14.2.6.5 (a), (b), ( c), (d) 111-116 Possible Causes Of Fire Pump Troubles 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection B.1 Fig.B.1 117 O R R Elevation / Temperature Derate Curve Contractor Material And Test Certificate For Fire Pump / Private Fire Service Main N FIRE FIGHTING PUMPS / TANKS / HYDRANT FIRE FIGHTING FIRE PUMPS REQUIREMENTS TABLE/CHART/FIGURE 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE Fire Pump Discharge (Pressure Rating, Steel Pipe, Sizing, Valves, Low Suction Pressure Control, PRV) CHAPTER.SECTION R S SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE REFERENCE ITEM TABLE/CHART/FIGURE PAGE IN PDF HANDBOOK Total Head Of All Fire Pump Schematic Diagram Of Suggested Arrangements For Fire Pump With Bypass, Taking Suction From Public Mains Right And Wrong Pump Suctions 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection A.3 Fig.A.3.3.25.3.1, 2 71 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection A.4 Fig.A.4.15.4 74 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection A.4 Fig.A.4.15.6 74 Anti Vortex Plate Assembly 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection A.4 Fig.A.4.15.10 75 Preferred Arrangement For Measuring Fire Pump Water Flow 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection A.4 Fig.A.4.21.1.2 (a), (b) 77, 78 Fig.A.4.26.6.5 Jockey Pump Installation Details 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection A.4 Foundation Details For Fire Pump Set Piping Connection For (Pressure Switch, Pressure Sensing Line, Horizontal Split Case Of Positive Suction Head) Vertical Turbine Pump (Installation In Well/Wet Pit, Belowground Discharge Arrangement) 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection A.4 Fig.A.4.30.9 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection A.4, A.6 Fig.A.4.31(a), (b), A.6.3.1(a) 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection A.7 Fig.A.7.2.2.1, 2, Fig.A.7.3.1 89 Foam Pump Piping And Fittings / Water Mist Pump Piping And Fittings 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection A.8 Fig.A.8.5.2(a), (b), Fig.A.8.5.4, 5 92-94 Ventilation System For Diesel Pump Room 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection A.11 Fig.A.11.3.2(a), (b) 100 Fuel System For Diesel Pump Room 2016 NFPA 20 / Installation Of Stationary Pumps For Fire Protection A.11 Fig.A.11.4.4 101 2013 NFPA 22 / Water Tanks For Private Fire Protection 14.1, 14.2 … 39-42 2013 NFPA 22 / Water Tanks For Private Fire Protection 14.3 … 42 2013 NFPA 22 / Water Tanks For Private Fire Protection 14.4 … 42, 43 2013 NFPA 22 / Water Tanks For Private Fire Protection 14.5-14.7 … 43, 44 2013 NFPA 22 / Water Tanks For Private Fire Protection 14.8 … 44 2013 NFPA 22 / Water Tanks For Private Fire Protection 15.1 … 45, 46 Fire Water Tank Piping/Fitting Connection (Water Level Gauge, Tanks With Large Tank Risers, Discharge Piping Protection, Steel Pipe, Discharge Pipe, Pipe Material, Braces, Support, Offset, Rigid Connection, Swing Joints, Check Valve, Controlling Valve, Anti-Vortex Plate) Fire Water Tank Expansion Joint (Connection To Tank, General Design, Clearances, Body, Gland, SlipTube, Packing, Connections For Use Other Than For Fire Protection) Fire Water Tank Filling (Duration, Bypass Around Check Valve, Filling Pumps, Filling From Drinking Water Supply, Filling Pipe At Roofs And Floors, Suction Tanks) FIRE FIGHTING WATER TANK Fire Water Tank (Break Tank Application/Size/Refill Mechanism, Overflow Size/Inlet/Stub Pipe/Inside Pipe, Clean-Out And Drain Handhole/Manholes/For Elevated Flat-Bottom Tanks/ Tank Riser Drain) Fire Water Tank Connections For Other Than Fire Protection (Dual-Service Tanks, Pipe For Other Than Fire Protection Purposes, At Roofs And Floors, Sensors, Pressure Tanks) Fire Water Tank Valve Pit Or House And Heater House (Materials, Dimensions, Pit Valve/Loads/Manhole/Ladder/Waterproofing/Drain, Heater House, Heating Valve House Or Pit And Heater House) 82, 87 15.2 … 46, 47 Anti-Vortex Plate Typical Detail 2013 NFPA 22 / Water Tanks For Private Fire Protection B.1 Fig.B.1 82 Private Fire Service Mains General Requirements (Plans, Installation Work) 2013 NFPA 24 / Installation Of Private Fire Service Mains CH.04 … 12 2013 NFPA 24 / Installation Of Private Fire Service Mains CH.05 … 12, 13 2013 NFPA 24 / Installation Of Private Fire Service Mains CH.06 … 13-15 2013 NFPA 24 / Installation Of Private Fire Service Mains CH.07 … 15 2013 NFPA 24 / Installation Of Private Fire Service Mains CH.08, 09 … 16 Private Fire Service Mains UnderGround Piping (Piping Materials/Third Party Test Certificate, Fittings, Joining Method, Depth Of Cover, Protection Against Freezing, Protection Against Damage, Requirement For Laying Pipe, Joint Restraint, Backfilling, Flushing Of Piping, Hydrostatic Test) 2013 NFPA 24 / Installation Of Private Fire Service Mains CH.10 … 16-24 Fire Water Tank Frostproof Casing (General, Wood, Top, Bottom, Paint) M Private Fire Service Mains Water Supply (Connection To Waterworks Systems, Size Of Fire Mains, Pressure-Regulating Devices And Meters, Connection From Waterworks Systems, Pumps, Tanks, Penstocks/Flumes/Rivers/Lakes/Reservoirs, Fire Department Connections General / Couplings/Valves/Drainage/Location/Signage) Private Fire Service Mains Valves (Types, Valves Controlling Water Supplies, Post Indicator Valves, Valves In Pits, Backflow Prevention Assemblies, Sectional Valves, Identifying And Securing Valves, Check Valves) Private Fire Service Mains Hydrant (General, Qty, Location, Installation) Private Fire Service Mains Hose Houses And Equipment (General, Hose Connections, Location, Construction, Size/Arrangement, Marking, General Equipment, Domestic Service Use Prohibited, Master Streams Application/Special Considerations) 2013 NFPA 22 / Water Tanks For Private Fire Protection 2013 NFPA 24 / Installation Of Private Fire Service Mains CH.11 … 24 2013 NFPA 24 / Installation Of Private Fire Service Mains CH.12, 13 … 24, 25 Private Fire Service Mains Schematic / Typical Details (Typical Private Fire Service Main, Typical Fire Department Connection, Typical City Water Pit/Valve Arrangement, Pit For Gate Valve/Check Valve/Fire Department Connection, Typical Wall Fire Hydrant Installation, Typical Hydrant Connection With Min/Max Height Requirement, Standard Monitor Nozzles, Typical Hydrant-Mounted Monitor Nozzle, Riser Entrance Location, Pipe Joint Location In Relation To Foundation Footings, Bearing Thrust Block, Typical Connection to Fire Protection System Riser Illustrating Restrained Joints, Methods of FlushingWater Supply Connections, Suggested Test Layout for Hydrants, Pitot Tube Position, Sample Report of Hydrant Flow Test) 2013 NFPA 24 / Installation Of Private Fire Service Mains A-A, B, C … 25-30, 34, 35, 38, 39, 43, 44, 50 R Private Fire Service Mains Hydraulic Calculation/Friction Loss Private Fire Service Mains Above Ground Piping/Fitting (General, Piping Protection, Sizing) R PRIVATE FIRE SERVICE MAINS R S CHAPTER.SECTION O FIRE FIGHTING PUMPS / TANKS / HYDRANT FIRE FIGHTING FIRE PUMP SCHEMATIC/TYPICAL DETAILS HANDBOOK AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE GENERAL DESCRIBTION N SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE REFERENCE ITEM DESCRIBTION HANDBOOK Portable Fire Extingusher (Listing, Labeling, Third Party Test Certificate, Identification, Manual Instruction) Portable Fire Extingusher Types GENERAL 2018 NFPA 10 / Standard For Portable Fire Extingushers PAGE IN PDF HANDBOOK 4.1, 4.2 … 11, 12 4.3, 4.4 … 12 5.1 … 12 5.2 … 12 5.3 … 12 Portable Fire Extingusher Fires Classifications 2018 NFPA 10 / Standard For Portable Fire Extingushers Portable Fire Extingusher Extingusher Classification System 2018 NFPA 10 / Standard For Portable Fire Extingushers Portable Fire Extingusher Hazard Classification 2018 NFPA 10 / Standard For Portable Fire Extingushers 5.4 … 13 Portable Fire Extingusher Selection For Specific Hazards 2018 NFPA 10 / Standard For Portable Fire Extingushers 5.5 … 13 Portable Fire Extingusher Selection For Specific Locations 2018 NFPA 10 / Standard For Portable Fire Extingushers 5.6 … 14 2018 NFPA 10 / Standard For Portable Fire Extingushers C.1, C.2, C.3 … 41-44 2018 NFPA 10 / Standard For Portable Fire Extingushers 6.1 … 15, 16 2018 NFPA 10 / Standard For Portable Fire Extingushers 6.2 … 16, 17 2018 NFPA 10 / Standard For Portable Fire Extingushers 6.3 … 17 2018 NFPA 10 / Standard For Portable Fire Extingushers 6.4 … 17 Portable Fire Extingusher Size And Placement For Class D Hazards 2018 NFPA 10 / Standard For Portable Fire Extingushers 6.5 … 18 Portable Fire Extingusher Size And Placement For Class K Hazards 2018 NFPA 10 / Standard For Portable Fire Extingushers 6.6 … 18 Portable Fire Extingushe Hydrostatic testing 2018 NFPA 10 / Standard For Portable Fire Extingushers CH.08 … 23-26 AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE PORTABLE FIRE EXTINGUSHER INSTALLATION/TESTING 2018 NFPA 10 / Standard For Portable Fire Extingushers Portable Fire Extingusher Selection Factors Portable Fire Extingusher Selection Princibles/Matching Fire Extinguishers To The Hazard/Selecting The Right Fire Extinguisher Portable Fire Extingusher Installation (Number Of Extinguishers, Extinguisher Readiness, Placement, Visual Obstructions, Installation Height, Label Visibility, Antifreeze, Electronic Monitoring And Alarm System) Portable Fire Extingusher Size And Placement For Class A Hazards Portable Fire Extingusher Size And Placement For Class B Hazards (Spill Fires, Flammable Liquids Of Appreciable Depth, Obstacle, Gravity/Three-Dimensional, And Pressure Fire Hazards) Portable Fire Extingusher Size And Placement For Class C Hazards Examples Of Portable Fire Extingusher For Protecting Class A & B Hazards 2018 NFPA 10 / Standard For Portable Fire Extingushers A.5.3.2.1, A.5.3.2.2 … 30 Portable Fire Extingusher Recommended Marking System / Letter-Shaped Symbol Markings 2018 NFPA 10 / Standard For Portable Fire Extingushers B.2 Fig.B.1.1, Fig.B.1.2 41 Wheeled/Outdoor Portable Fire Extingusher 2018 NFPA 10 / Standard For Portable Fire Extingushers C.3.7 Fig.C.3.7.2(a), (b) 45 Portable Fire Extingusher Operation And Methods Of Expelling 2018 NFPA 10 / Standard For Portable Fire Extingushers D.1.2 Table D.1.2.2 46 Portable Fire Extingusher Typical Details 2018 NFPA 10 / Standard For Portable Fire Extingushers D.4 Fig.D.4.1-Fig.D.4.8 47-53 Portable Fire Extingusher Distribution/Arrangement In Building 2018 NFPA 10 / Standard For Portable Fire Extingushers E.2 … 53 Class A Portable Fire Extinguisher Distribution 2018 NFPA 10 / Standard For Portable Fire Extingushers E.3 Table E.3.5, E.3.6, E.3.7 / Fig.E.3.4, E.3.10, E.3.12, E.3.15 53-57 Class B Portable Fire Extinguisher Distribution 2018 NFPA 10 / Standard For Portable Fire Extingushers E.4 … 57 Class C Portable Fire Extinguisher Distribution 2018 NFPA 10 / Standard For Portable Fire Extingushers E.5 … 57 Class D Portable Fire Extinguisher Distribution 2018 NFPA 10 / Standard For Portable Fire Extingushers E.6 … 58 Characteristics Of Portable Fire Extinguishers 2018 NFPA 10 / Standard For Portable Fire Extingushers H.2 Table H.2 62, 63 O R R M TYPICAL DETAILS, TABLES AND EXAMPLES N PORTABLE FIRE EXTINGUSHER FIRE FIGHTING PORTABLE FIRE EXTINGUSHER REQUIREMENTS/SELECTION 2018 NFPA 10 / Standard For Portable Fire Extingushers TABLE/CHART/FIGURE CHAPTER.SECTION R S SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE REFERENCE ITEM DESCRIBTION GENERAL Carbon Dioxide Requirements (Restrictions For Normally Occupied Enclosures, Use/Limitations, Hazards To Personnel, Specifications, Plans, Approvals, Detection, Actuation, Control, Carbon Dioxide Supply, Distribution Systems, Inspection, Maintenance, Instruction) Carbon Dioxide Total Flooding Systems (Description/Uses, Hazard Specifications, Carbon Dioxide Requirements For Surface Fires, Carbon Dioxide Requirements for Deep-Seated Fires, Distribution System, Venting Consideration) Carbon Dioxide Local Application Systems (Description/Uses, Hazard Specifications, Carbon Dioxide Requirements, Rate-By-Area Method, Rate-By-Volume Method, Distribution System) TABLE/CHART/FIGURE PAGE IN PDF HANDBOOK 2018 NFPA 12 / Standard For Carbon Dioxide Extingushers System CH.04 … 10-21 2018 NFPA 12 / Standard For Carbon Dioxide Extingushers System CH.05 … 21-25 2018 NFPA 12 / Standard For Carbon Dioxide Extingushers System CH.06 … 25-28 2018 NFPA 12 / Standard For Carbon Dioxide Extingushers System CH.07 … 28, 29 2018 NFPA 12 / Standard For Carbon Dioxide Extingushers System CH.08 … 29 2018 NFPA 12 / Standard For Carbon Dioxide Extingushers System A-A, B, C, D, E, F, G … 31-62 2018 NFPA 12 / Standard For Carbon Dioxide Extingushers System A-A, B, C, D, E, F, G … 31-62 2018 NFPA 12 / Standard For Carbon Dioxide Extingushers System A-A, B, C, D, E, F, G … 31-62 Clean Agent Supply (Quantity, Quality, Storage Container Arrangement, Agent Storage Containers) 2018 NFPA 2001 / Standard For Clean Agent Extingushers System 4.1 … 14, 15 Clean Agent Distribution (Pipe, Dirt Trap, Pipe Connections, Pipe Hangers/Supports, Valves, Discharge Nozzles) 2018 NFPA 2001 / Standard For Clean Agent Extingushers System 4.2 … 15-18 Clean Agent Detection/Actuation/Alarm/Control (General, Automatic Detection, Operating Devices, Control Equipment, Operating Alarms And Indicators, Time Delays, Unwanted System Operation) 2018 NFPA 2001 / Standard For Clean Agent Extingushers System 4.3 … 18-20 Clean Agent Design (Specifications/Plans/Approvals, System Flow Calculations, Enclosure, Design Concentration Requirements, Duration of Protection, Distribution System, Nozzle Choice/Location) 2018 NFPA 2001 / Standard For Clean Agent Extingushers System CH.05 … 20-24 2018 NFPA 2001 / Standard For Clean Agent Extingushers System CH.06 … 24, 25 Clean Agent Local Application Systems (Description, Hazard Specifications, Clean Agent Requirements, Nozzles, Location And Number Of Nozzles) Clean Agent Approval Of Installations (Safety, General, Acceptance Test Report, Review Of Mechanical Components, Review Of Enclosure Integrity, Review Of Electrical Components, Functional Testing, Owner’s Documentation, Training) CH.07 … 25-28 2018 NFPA 2001 / Standard For Clean Agent Extingushers System A-A, B, C … 63-108 Clean Agent Charts (Isometric Diagram of FIC-13I1, Temperature/Gauge pressure Containers, Isometric Diagram Of HFC-125 Pressurized With Nitrogen, Isometric Diagram Of IG-01, Isometric Diagram Of IG55 Filled at 59°F (15°C), Normal Distribution Curve, Peak HF Concentrations, Hazard Assessment Of HF Concentrations, Example of an Actual IG-541 60-Second Discharge Showing Peak Pressure) 2018 NFPA 2001 / Standard For Clean Agent Extingushers System A-A, B, C, D … 43-117 Clean Agent Tables/Forms (Physical Properties Of Clean Halocarbon Agents/Inert Gas Agents, Toxicity Information for Halocarbon Clean Agents, Potential Human Health Effects, Oxygen Partial Pressure, Physiological Effects of Inert Gas Agents, Relationship of Altitude to Atmospheric Pressure, Potential Environmental Impacts, Storage Container Characteristics, Piping Systems Fittings, Minimum Flame Extinguishing Concentration, Plastic Fuel Properties, Inerting Concentrations for Various Agents, Total Flooding Quantity, Acceptance Test Report, Cup Burner System Major Components, Agent Vapor Densities) 2018 NFPA 2001 / Standard For Clean Agent Extingushers System A-A, B, C … 33-113 R R M 2018 NFPA 2001 / Standard For Clean Agent Extingushers System Clean Agent Typical Details (Four-Piece Modified Plastic Setup, Chamber Plan View, Spherical Test Vessel, Piping For Design Factor Tee Count, Machinery Space/Stack Uptake, Cup Burner Assembly, Cup Material, Base, Detail, Base Support Plate, Diffuser Bead Support Screen) O CLEAN AGENT EXTINGUSHING SYSTEM Carbon Dioxide Hand Hose Line Systems (Description/Uses, Hazard Specifications, Location/Spacing, Carbon Dioxide Requirements, Equipment Specifications, Training) Carbon Dioxide Standpipe Systems/Mobile Supply (Description/Uses, Hazard Specifications, Standpipe Requirements, Mobile Supply Requirements, Training) Carbon Dioxide Typical Details (Typical High-Pressure Storage Facility, Typical Low-Pressure Storage Facility, Diagram Of Enclosure) Carbon Dioxide Charts (Partial Enclosure Flow Rate Reduction, Pressure Drop in Pipeline, Carbon Dioxide Requirements For Inert Atmospheres, Calculated CO2 Loss Rate, Listing Or Approval Curve Of Typical Nozzle Showing Maximum Area Versus Height Or Distance From Liquid Surface, Variation Of Pressure Of Carbon Dioxide With Change In Temperature) Carbon Dioxide Tables/Forms (Units, Acceptance Test Report, Equivalent Orifice Sizes, Extended Discharge Protection For Enclosed Recirculating Rotating Electrical Equipment, Strength And Allowable Pressures For Average Enclosures, Equivalent Lengths In Feet Of Threaded/Welded Pipe Fitting, Elevation Correction Factors For Low/High Pressure System, Acute Health Effects Of High Concentrations Of Carbon Dioxide) N SPECIAL FIRE FIGHTING SYSTEMS FIRE FIGHTING CARBON DIOXIDE EXTINGUSHING SYSTEM CHAPTER.SECTION R S HANDBOOK AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE REFERENCE ITEM PAGE IN PDF HANDBOOK CH.04 … 9-11 CH.05 … 11-13 2017 NFPA 17 / Standard For Dry Chemical Extingushers System CH.06 … 13, 14 2017 NFPA 17 / Standard For Dry Chemical Extingushers System CH.07 … 14, 15 2017 NFPA 17 / Standard For Dry Chemical Extingushers System CH.08 … 15 2017 NFPA 17 / Standard For Dry Chemical Extingushers System CH.09 … 15-17 2017 NFPA 17 / Standard For Dry Chemical Extingushers System A-A … 24, 25, 27 2017 NFPA 17 / Standard For Dry Chemical Extingushers System A-A … 26 2017 NFPA 17A / Standard For Wet Chemical Extingushers System CH.04 … 9, 10 2017 NFPA 17A / Standard For Wet Chemical Extingushers System CH.05 … 10-12 2017 NFPA 17A / Standard For Wet Chemical Extingushers System A-A … 17 2017 NFPA 17A / Standard For Wet Chemical Extingushers System A-A … 18, 19 2017 NFPA 15 / Standard For Water Spray Fixed System CH.04 … 10, 11 2017 NFPA 15 / Standard For Water Spray Fixed System CH.05 … 11-16 2017 NFPA 15 / Standard For Water Spray Fixed System CH.06 … 16-22 Water Spray System Design (Size Of System/Water Demand, Extinguishment, Control Of Burning, Exposure Protection, Flammable Vapor Mitigation, Combined Systems, Automatic Detection Equipment) 2017 NFPA 15 / Standard For Water Spray Fixed System CH.07 … 22-26 Water Spray System Plans/Hydraulic Calculations (General, Working Plans, Hydraulic Calculations, Water Supply Information, Hydraulic Calculation Procedures) 2017 NFPA 15 / Standard For Water Spray Fixed System CH.08 … 26-29 Water Spray System Water Supplies (General, Volume and Pressure, Acceptable Water Supply Systems) 2017 NFPA 15 / Standard For Water Spray Fixed System CH.09 … 29, 30 2017 NFPA 15 / Standard For Water Spray Fixed System CH.10 … 30-37 2017 NFPA 15 / Standard For Water Spray Fixed System CH.12 … 37-39 2017 NFPA 15 / Standard For Water Spray Fixed System A-A, B … 41-64 2017 NFPA 15 / Standard For Water Spray Fixed System A-A, B … 56, 57, 64, 65 … 42, 48, 49, 55, 59, 61, 62, 65-74 Wet Chemical System Components (General, Detectors, Discharge Nozzles, Manual Actuators, Shutoff Devices, Pipe/Fittings, Tubing, Hose, Wet Chemical, Electrical Wiring/Equipment, Indicators, Assembly) M Water Spray System Acceptance (Certification, Flushing Of Supply Pipe, Operating Tests, Hydraulic Design Information Sign, General Information Sign) Water Spray Systems / Ultra-High-Speed (General, Response Time, Design Considerations, System Acceptance, Testing/Maintenance) 2017 NFPA 17 / Standard For Dry Chemical Extingushers System R Water Spray Systems Schematic/Typical Details (Drainage Trench Detail, Acceptable Weld Joints, Unacceptable Weld Joints, Support Legs, Support Legs, Drain Connection for System Riser, Explosion Protection Of Water Spray Or Piping, Typical Roller Protection, Typical Conveyor Belt Protection, Typical Hooded Conveyor, Typical Horizontal Tank Protection, Typical Vertical Tank with Skirt Protection, Typical Transformer Layout, Ultra-High-Speed Local Application for a Point of Hazard, UltraHigh-Speed Dual Application System, Ultra-High-Speed System Using Squib-Operated Valve, Water Spray System Used for Sample Calculations) R WATER SPRAY FIXED SYSTEM Wet Chemical System Requirements (Use, Applications, System Actuation, Supervision, System Location, Discharge Nozzles, Special Requirements, Protection Of Common Exhaust Duct) Wet Chemical Schematic/Typical Details (Operation Of A System That Protects A Hood And The Common Duct) Wet Chemical Tables/Forms (Typical Temperature Ratings of Fixed Temperature-Sensing Elements, Acceptance Test Report) Water Spray System Requirements (Design Objectives, Special Considerations, Water Soluble Materials, Qualifications, Control Of Runoff, Flammable/Combustible Liquids) Water Spray System Components (General, Water Spray Nozzles, Special Coatings, Corrosion-Resistant Coatings, Painting, Guards, Stock of Spare Automatic Water Spray Nozzles And Pilot Sprinklers, Pipe/Tube/Fittings, Joining Of Pipe/Fittings, Hangers, Valves, Pressure Gauges, Strainers, Fire Department Connections, Alarms, Detection Systems) Water Spray System Installation (Basic Requirements, Water Spray Nozzles Selection / Temperature Rating, Water Supply Control Valves, Valve Supervision, Location Of System Actuation Valves, Pipe Support, Piping Drainage, Alarms, Remote Manual Actuation, Fire Department Connections, Gauges, Automatic Detection Equipment) Water Spray Systems Charts (Time–Temperature Curve, Determination of Velocity Pressure, Sample Graph Sheet) O WET CHEMICAL EXTINGUSHING SYSTEM 2017 NFPA 17 / Standard For Dry Chemical Extingushers System R S Dry Chemical System Components (Detectors, Hand Hose Line/Nozzle Assembly, Nozzles, Manual Actuators, Shutoff Devices, Valves, Pipe/Fittings, Dry Chemical, Expellant Gas, Storage Containers, Indicators, Assembly) Dry Chemical System Requirements (Use/Limitations, Multiple Systems Protecting A Common Hazard, Systems Protecting Two Or More Hazards, Dry Chemical Requirements/Distribution, Special Considerations, Personnel Safety, Operation/Control Of Systems, Dry Chemical/ Expellant Gas Supply, Piping, Pipe Size/Nozzle Determination) Dry Chemical Total Flooding Systems (General, Hazard Specifications, Leakage/Ventilation, Volume Allowances, Rate Of Application) Dry Chemical Local Application Systems (Uses, Extent of Hazard, Location, Coated Surfaces, Duration Of Discharge) Dry Chemical Hand Hose Line Systems (Separate Supplies, Location, Spacing, Actuation, Rate/Duration Of Discharge, Simultaneous Use Of Hose Lines, Operation Of Hose Lines) Dry Chemical Pre-Engineered Systems (Uses, Types Of Systems, Commercial Kitchen Hood, Duct, Cooking Appliance Systems, Protection Of Common Exhaust Duct, Shutoff Devices, Manual Actuation Requirements, System Annunciation Requirements, System Supervision, Review/Certification, Vehicle Fueling Service Station Systems, Systems For The Protection Of Mobile Equipment, Hand Hose Line Systems) Dry Chemical Schematic/Typical Details (Venturi Assembly, Piping Into A Tee In A Dry Chemical System, Operation Of A System That Protects A Hood And The Common Duct, Design Of A VerificationOf-Service Collar) Dry Chemical Forms (Acceptance Test Report) CHAPTER.SECTION AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE DRY CHEMICAL EXTINGUSHING SYSTEM SPECIAL FIRE FIGHTING SYSTEMS TABLE/CHART/FIGURE HANDBOOK GENERAL FIRE FIGHTING DESCRIBTION Water Spray Systems Tables/Forms (Steel Pipe Dimensions, Determining Design Flow Rate, Constants for Determining Velocity Pressure, Capacity of One Foot of Pipe, Hydraulic Calculation Form, ) N SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE 2017 NFPA 15 / Standard For Water Spray Fixed System A-A, B REFERENCE ITEM HANDBOOK SPECIAL FIRE FIGHTING SYSTEMS LOW-MEDIUM-HIGH EXPANSION FOAM TABLE/CHART/FIGURE PAGE IN PDF HANDBOOK 2016 NFPA 11 / Standard For Low, Medium & High Expansion Foam CH.04 … 12-16 Low Expansion Foam System Design (Types Of Hazard, Outdoor Fixed Roof/Cone Tank, Outdoor OpenTop Floating Roof Tank, Outdoor Covered/Internal Floating Roof Tank, Indoor Hazard, Loading Racks, Diked Areas/Outdoor, Nondiked Spill Areas, Supplementary Protection) 2016 NFPA 11 / Standard For Low, Medium & High Expansion Foam CH.05 … 16-28 Medium/High Expansion Foam System (General, Use/Limitation, Hazards Protected, Types Of Systems, Systems Protecting One Or More Hazards, Personnel Safety, Operation/Control System, Foam Concentrate, Air Supply, Foam-Generating Apparatus Location, Distribution System, Total Flooding System, Local Application System, Foam Applications For LNG, Portable Foam-Generating Devices) 2016 NFPA 11 / Standard For Low, Medium & High Expansion Foam CH.06 … 28-34 Compressed Air Foam Systems (General, Water Supplies Quality/Quantity/Pressure/ Temperature/Design, Foam Concentrate Quality/Quantity/Storage, Air/Nitrogen Supply, Compressed Air Foam-Generating Method, Distribution System, Compressed Air Foam Discharge Device, Operation/Control System, System Types, Limitations, System Design, Piping/Fitting, Automatic Detection, CAFS Discharge Device Choice/Location, Discharge Density, Discharge Duration, Flow Calculation) 2016 NFPA 11 / Standard For Low, Medium & High Expansion Foam CH.07 … 34, 35 Foam System Installation (Foam Concentrate Pump, Flushing, Power Supply, Low Expansion Foam System Piping/Valves, Hanger/Support/Piping Protection) 2016 NFPA 11 / Standard For Low, Medium & High Expansion Foam CH.09 … 37, 38 Foam System Material (Pipes, Valve, Fitting, Joint, Third Party Test Certificate) 2016 NFPA 11 / Standard For Low, Medium & High Expansion Foam 10.13 … 42 Foam System Schematic/Typical Details (Foam Trough, Typical Air Foam Piping For Intermediate BackPressure Foam System, In-Line Eductor, Handline Foam Nozzle, Adjustable Straight Stream Monitor, Wheeled/Portable Foam-Water Monitor, In-Line Balanced Pressure Proportioning Pump/Bladder Tank Single/Multiple Injection Points, Coupled Water-Motor Driven Pump Proportioning System, Single/Dual Meter Flow Sensing Direct Injection, Diaphragm/Bladder/Proportioning Tank, Air Foam Protection, Foam Chamber/Maker, Automatic Medium/High Expansion Foam System, Blower Type Foam Generator, Foam Collector/Container, Test Nozzle, Fire Performance Test, Foam Quality Test, Drainage Drum/Test, Evaluation Test Pit) 2016 NFPA 11 / Standard For Low, Medium & High Expansion Foam A-A, B, C, D, E, F, G, H … 44-95 2016 NFPA 11 / Standard For Low, Medium & High Expansion Foam A-A, D … 57-60, 80, 81 2016 NFPA 11 / Standard For Low, Medium & High Expansion Foam A-A, B, D, G … 61, 70, 72-76, 79, 94 2019 NFPA 16 / Standard For Foam-Water Sprinkler & Spray CH.04 … 14, 15 2019 NFPA 16 / Standard For Foam-Water Sprinkler & Spray CH.05 … 15, 16 2019 NFPA 16 / Standard For Foam-Water Sprinkler & Spray CH.06 … 16-19 Foam-Water Deluge System Design/Installation (General, Design Criteria, Wet/Dry/Preaction System, Total Design Area, Foam Solution Discharge Duration, Proportioning System, Power Supply/Controller, Foam Concentrate Lines, Containment/Drainage/Spill Control, Equipment Location, Alarms, Strainers, Sprinkler Spacing/Location, Temperature Rating, System Tripping/Foam Concentration Injection, Fire Department Connection, Hydraulic Calculation) 2019 NFPA 16 / Standard For Foam-Water Sprinkler & Spray CH.07 … 19-22 Foam-Water Deluge System Acceptance Test (Flushing Of Supply Piping, Hydrostatic Pressure Test, UnderGround Piping, System Discharging Test, Proportioning System Test, General Information Sign) 2019 NFPA 16 / Standard For Foam-Water Sprinkler & Spray CH.08 … 23-27 Foam-Water Deluge System Schematic/Typical Details (Variations In Deflector Shape, Foam-Water Spray Nozzle, Foam Liquid-Concentrate Storage Tank/Pump/Metering Proportioners/Interconnecting Piping, Balanced-Pressure Proportioning System, Test Connection Details, Warehouse Spill Control, Drainage Trench, Liquid Sealed Trap, FFFP Concentration Test) 2019 NFPA 16 / Standard For Foam-Water Sprinkler & Spray A-A, B … 29-45 2019 NFPA 16 / Standard For Foam-Water Sprinkler & Spray A-B … 44, 45 2019 NFPA 16 / Standard For Foam-Water Sprinkler & Spray A-B … 37-42 2016 NFPA 13 / Installation Of Sprinkler Systems 7.3.1, 7.3.3, 8.1.7.4 … 42-44, 104, 105 R S Foam System Components/Types (General, Water Supplies Quantity/Pressure/ Temperature/Design/Storage/Water-Foam Pump, Foam Concentrate, Concentrate Compatibility, Foam Proportioning, Foam Concentrate Pumps, Piping/Fitting/Valves, System Types, Operation/Control System) Foam System Charts (Foam Velocity Vs Pipe Size, Foam Friction Loss, Refractive Index/Conductivity Vs Foam Concentration) Foam System Tables/Forms (Duration Of Discharge For Semisubsurface System, Minimum Number Of Subsurface Unit, Contractor Material/Test Certificate, Storage Tank Protection Summary, Foam Sample Drain Time, Foam Type Test Report) Foam-Water Deluge Requirements (System Types, Discharge Duration, Reserve Supply, Preprimed System, Approvals, Working Plans, Hydraulic Calculations) Foam-Water Deluge Water Supplies (Water Quality, Water Supply Capacity/Pressure/Duration, Water Supply Evaluation, Procedure, Duration) R M Foam-Water Deluge System Components (Approved Devices/Materials, Discharge Devices, Foam Concentrate, Foam Concentrate Proportioning Means, Foam Concentrate Pump Material/Rated Capacities, Overpressurization/Flushing, Foam Concentrate Atmospheric/Pressure Storage Tank, Piping/Valves/Fittings/Hangers, Strainers, Fire Department Connection, Automatic System Detection, Valve Supervision, Test Connection, Stock Of Spare Sprinklers) R Foam-Water Deluge System Charts (Refractive Index Vs Concentration Refractometer, Conductivity Vs Concentration) Foam-Water Deluge System Tables/Forms (Sample List, Foam Expansion Drainage Time, Sample Hydraulic Design Information Sign, Foam-Water Sprinkler System) Deluge System (Pressure Gauges, Releasing Devices Location/Spacing, Control Valve Location/Protection, Sprinkler Test Connection) O FOAM-WATER DELUGE-SPRAY CHAPTER.SECTION AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE GENERAL FIRE FIGHTING DESCRIBTION N SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE REFERENCE ITEM TABLE/CHART/FIGURE Water Mist System General (Use/Limitation, Electrical Clearance, Enviromental Factors) 2019 NFPA 750 / Standard For Water Mist Fire Protection Systems CH.04 … 13 Water Mist System Occupancies (Light/Ordinary Hazard, Specific Applications) 2019 NFPA 750 / Standard For Water Mist Fire Protection Systems CH.05 … 13, 14 Water Mist System Components (Design Pressure, Corrosion Resistance, Gas/Water Container, Piping And Fitting Material/High Pressure/Low Pressure/Third Party Test Certificate, Hanger/ Support, Nozzle, Valves, Strainer/Filter, Pump System, Detection/Alarm/Actuation/ Control System, Compatibility) 2019 NFPA 750 / Standard For Water Mist Fire Protection Systems CH.06 … 14-20 2019 NFPA 750 / Standard For Water Mist Fire Protection Systems CH.07 … 20, 21 2019 NFPA 750 / Standard For Water Mist Fire Protection Systems CH.08 … 21-27 2019 NFPA 750 / Standard For Water Mist Fire Protection Systems CH.09 … 27-29 AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE R S CHAPTER.SECTION Water Mist System Requirements (General, System Applications, Nozzle Types, Deluge System, Wet Pipe, Preaction, Dry Pipe, Media System Types, Additive Systems) Water Mist System Installation (General, Occupancy Protection System, Proteced Area Limitation, Nozzle Height/Spacing/Obstruction/Protection/Temperature Rating, Piping Listing/Third Party Test Certificate/Support/Drainage, Fitting, Gas/Water Container, Pumps, Strainer/Filter, Valves/Pressure Gauge, Electrical System, Test Connection) Water Mist System Design (General, Listing Evaluations, Fire Performance Objectives, Fire Control, Fire Supression, Fire Extingushing, Compartment Variables, Compartment Geometry, Natural/Forced Ventilation, Fire Hazard Classifications, Fuel Types, Fire Locations, Obstruction, Shielding, Preaction System) Water Mist Occupancy Protection System (General, Light/Ordinary Hazard, Residential Up To 4 Stories/One And Two Family Dwelling) CH.10 … 29-32 2019 NFPA 750 / Standard For Water Mist Fire Protection Systems CH.11 … 32-36 Water Mist System Calculation/Atomizing Media (General, Quantity, Duration, Reserve Supply, Water Supply Quality/Pump/Fire Department Connection, Automizing Media/Twin-Fluid System Plant Air/Supervision/Moisure Content/Regulators/Check Valves/Filters/Air Compressor/Pressure Gauge) 2019 NFPA 750 / Standard For Water Mist Fire Protection Systems CH.12 … 36-38 Water Mist System Schematic/Typical Details (Installation Of Measurements For Applications, Droplet Size Measurement Locations, Nozzle Locations, Schematic Of Water Mist Systems) 2019 NFPA 750 / Standard For Water Mist Fire Protection Systems A-A … 50-66 Water Mist System Charts (FlowRate Per Unit Area Weighted Droplet Size Distribuation) 2019 NFPA 750 / Standard For Water Mist Fire Protection Systems A-A … 52 Water Mist System Tables/Forms (Clearance From Equipment, Recommended Minimum Bending Radii, Weighted Average Drop Size Distribuation, Acceptance Test Report, Internationally Agancies, Nominal Flash Points And Auto-Ignition Temperature, Operating Experience, Water Mist Quastionnaire) 2019 NFPA 750 / Standard For Water Mist Fire Protection Systems A-A, C, D, E … 49-80 R M 2019 NFPA 750 / Standard For Water Mist Fire Protection Systems Water Mist System Calculations (Flow Calculation Procedure, Darcy-Weisbach Calculation Method, Hazen-Williams Calculation Method, Velocity-Pressure Formula, Propellant Gas/Atomizing Media Calculation Procedure) R WATER MIST SYSTEM PAGE IN PDF HANDBOOK HANDBOOK O SPECIAL FIRE FIGHTING SYSTEMS FIRE FIGHTING GENERAL DESCRIBTION N SUB SERVICE MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE REFERENCE SUB SERVICE ITEM DESCRIBTION PAGE IN PDF HANDBOOK CH.04 … 14-16 CH.05 … 16, 17 2017 NFPA 96 / Standard For Commercial Cooking Operations CH.06 … 17, 18 2017 NFPA 96 / Standard For Commercial Cooking Operations CH.07 … 18-23 2017 NFPA 96 / Standard For Commercial Cooking Operations CH.08 … 23-25 2017 NFPA 96 / Standard For Commercial Cooking Operations CH.09 … 25 2017 NFPA 96 / Standard For Commercial Cooking Operations CH.10 … 26-28 2017 NFPA 96 / Standard For Commercial Cooking Operations CH.11 … 30, 31 2017 NFPA 96 / Standard For Commercial Cooking Operations Commercial Cooking Operations Fire Protection System Hood (Construction, Hood Size, Exhaust Hood, Fire Damper, Listed Hood Assemblies, Listed Ultra-Voilet Hoods, Listed Ventilated Ceiling Technology) 2017 NFPA 96 / Standard For Commercial Cooking Operations Commercial Cooking Operations Fire Protection System Grease Removal Devices In Hoods (Grease Removal Devices, Installation, Separation Distance, Protection, Grease Filters, Grease Drip Trays, Grease Filter Orientation) Commercial Cooking Operations Fire Protection System Exhaust Duct (General, Clearance, Openings, Openings In Ducts, Other Grease Ducts Materials/Installation, Welded Duct Connections, Exterior Installations, Duct Enclosures, Fire Resistance Rating, Enclosure Clearance, Termination Of Exhaust System) Commercial Cooking Operations Fire Protection System Air Movement (Exhaust Fans For Commercial Cooking Operations, Air Velocity, Air Flow, Exhaust Fan Operation, Replacement Air, Common Duct/Manifold Systems) Commercial Cooking Operations Fire Protection System Auxiliary Equipment (Dampers, Electrical Equipment, Other Equipment) Commercial Cooking Operations Fire Protection System Fire-Extinguishing Equipment (General Requirements, Types Of Equipment, Hoods With Water Wash, Water-Based Fire-Extinguishing System, Water Valve Supervision, Simultaneous Operation, Fuel/Electric Power Shutoff, Manual Activation, System Annunciation, Special Design/Application, Review/Certification, Installation Requirements, Portable Fire Extinguishers) Commercial Cooking Operations Fire Protection System Recirculating (General Requirements, Design Restrictions, Interlocks, Location/Application Restrictions, Additional Fire Safety Requirements, Use/Maintenance) Fire Protection System For Solid Fuel Cooking Operations (Venting Application, Location Of Appliances, Solid Fuel Cooking Hoods/Exhaust/Grease Removal Devices/Air Movement/Fire-Extinguishing Equipment/Inspection And Cleaning/Minimum Safety Requirements) FIRE FIGHTING FOR COMMERCIAL COOKING OPERATIONS 2017 NFPA 96 / Standard For Commercial Cooking Operations CH.12 … 31-35 Commercial Cooking Operations Downdraft Appliance Ventilation Systems (General Requirements, FireExtinguishing Equipment, Airflow Switch, Transducer, Surface Materials) 2017 NFPA 96 / Standard For Commercial Cooking Operations CH.13 … 35 Commercial Cooking Operations Fire Protection System Schematic/Typical Details (Open/Closed Combustible Construction, Styles Of Hoods, One/Two Stories Or More With Fire-Rated Floor-Ceiling Assembly, Hoods Penetrating Ceilings, Wall-Mounted Fan, Clearance To Combustible Material, Exhaust Hood Assemblies With Integrated Supply Air Plenums, Typical Arrangement Of Baffle Protecting Filters At Appliance Vent, Rooftop Terminations Through Combustible Or Limited-Combustible Walls, Typical Upblast Fan, In-Line Fan, Typical Utility Set Fan, System For Introducing Bleed Air Into Master Exhaust Duct, Typical Downdraft System Arrangement) 2017 NFPA 96 / Standard For Commercial Cooking Operations A-A … 36-46 2017 NFPA 96 / Standard For Commercial Cooking Operations A-A, B … 38, 57 2018 NFPA 99 / For Health Care Facilities Code CH.04 … 30, 31 2018 NFPA 99 / For Health Care Facilities Code CH.16 … 145-145 Commercial Cooking Operations Fire Protection System Tables/Forms (Types of Construction Assemblies Containing Noncombustible/Limited-Combustible/Combustible Materials, Schedule Of Inspection For Grease Buildup) Health Care Facilities Fire Protection System Fundamental (Risk Categories, Risk Assessment, Application, Materials) FIRE FIGHTING FOR HEALTH CARE FACILITIES METHOD OF STATEMENT FOR INSTALLATION, TESTING & COMMISSIONING OF FIRE FIGHTING R S Commercial Cooking Operations Fire Protection System Requirement (General, Clearances, Field-Applied And Factory-Built Grease Duct Enclosures, Building/Structural Duct Contact, Duct Clearances To Enclosures, Drawings, Authority Having Jurisdiction Notification, Noncombustible/Limited-Combustible Material) CHAPTER.SECTION AR O H C A H M IT M EC A D TS F & AQ EN IH G IN EE FIRE FIGHTING APPLICATIONS GENERAL Health Care Facilities Fire Protection System Features (Applicability, Construction/ Compartmentation, Special Hazard Protection For Flammable Liquids/Gases, Laboratories, Utilities Equipment Such As Gas/Electrical/Generators/HVAC/Elevators/Escalators/ Conveyors, Waste Chutes/Incinerators/Linen Chutes, Fire Detection/Alarm/Communications Systems, Automatic Sprinklers/Other Extinguishing Equipment, Manual Extinguishing Equipment, Compact Storage, Compact Mobile Storage, Maintenance/Testing, Fire Loss Prevention In Operating Rooms) https://safeworkmethodofstatement.com O R R Not Available N FIRE FIGHTING TABLE/CHART/FIGURE HANDBOOK M MAIN SERVICE MEP CODES REFERENCES SUMMARY SCHEDULE
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )