HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT "//&963& HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Bokaro Steel plant 1. INTRODUCTION Hazard Identification and Risk analysis (HIRA) deals with the identification and quantification of risks that are exposed to, due to accidents resulting from the hazards present or handling of hazardous substances in the workplace. This involves Hazard analysis which essentially is identification and quantification of the various hazards that are likely to occur in the industry as well as quantification of the consequences due to a particular hazard. The risk analysis estimates the probability as well as severity of a particular hazard over an exposed group of people, plant equipment or both. HIRA assists in identifying the most likely hazards which can have significant impact on workplace safety in an industry. It helps in devising effective management measures as well as engineering measures for both preventive as well as post-disaster management. 2. SCOPE OF THE STUDY The scope of this report includes the study of proposed operations, storage and handling of hazardous materials with respect to Hazard Identification, Risk Assessment and updation of existing Disaster Management plan (DMP). Based on the Hazard Identification and analysis, the major disaster scenarios would be worked out to estimate the consequence of failure. Bokaro Steel plant already has a comprehensive Disaster Management plan (DMP) and the same would be evolved to also meet the emergency situations due to the proposed expansion-cum-modernization project. The present report includes hazard identification and consequence analysis for the new projects included in the proposed expansion-cum-modernization of Bokaro Steel plant (BSL) as well as ongoing HIRA for existing critical units of BSL. The primary potential hazards due to the proposed units are identified based on a detailed Primary Hazard analysis (PHA) along with consequence analysis for the risk assessment. The same has been elaborated in Chapter-7 of the EIA-EMP report and briefed hereunder. Steel Authority of India Limited (SAIL) Bokaro Steel Plant -KDUNKDQG The proposed expansion-cum-modernization units/departments considered in this report are as below: A) Proposed Expansion-cum-modernisation projects i. Modernised BOF gas holder in modernised SMS-I ii. New BOF gas holder in SMS-II iii. Revamped propane storages within modernised SMS complex iv. Additional gas pipelines with new Gas mixing station The HIRA for these proposed expansion-cum-modernization units at BSL have been elaborated in Clause 3.0 of this report. Page 1 of 32 HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Bokaro Steel plant The HIRA process is an ongoing and continual process for existing units and are undertaken on periodical basis for ensuring good workplace safety at Bokaro Steel plant. It also involves a periodic review of the same as well as dissemination of information to various employees through instruction and along with adequate documentation and record-keeping. HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Bokaro Steel plant 3. HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA) FOR PROPOSED FACILITIES 3.1. Background BSL is engaged the production of Steel from iron ore and other required raw materials. During the process of manufacture of steel and other associated materials hazardous gases are generated which are stored and used in the plant. In addition to this, some other hazardous substances, which are required as feed/fuel in the process or produced as a by-product, will also be stored/handled by BSL. This information primarily includes: ≠ Hazard identification ≠ Assessment of risks associated with the identified hazards ≠ Control measures to manage the exposure to the risks ≠ Monitoring and review of the effectiveness of the controls. The procedure for carrying out Hazard Identification and Risk Assessment (HIRA) in different units at BSL is well defined and the same has been briefed in Annexure-1A of this report. The HIRA under implementation for the following existing units are included in this report: B) Existing Facilities of Bokaro Steel plant i. Energy Management Department (Fuel gases etc.) ii. Blast Furnace iii. Coke Oven and By-product plant iv. Steel making Shop v. Cold Rolling mill vi. Sinter Plant vii. Raw Material handling plant These have been elaborated in details in Clause 4.0 of this report. The major substances handled / stored by BSL includes Coke Oven gas (primarily H2& CH4), Blast furnace gas (primarily CO), LD Gas (primarily CO, N2 & CO2), Liquefied Petroleum Gas (LPG)/Propane, etc. In view of this, BSL’s existing and proposed activities are scrutinized in line of the above referred “Manufacture, storage and import of hazardous chemicals rules” and observations / findings are presented in this chapter. An elaborate and well-documented Disaster Management Plan covering all substances/gases handled by BSL for their existing plant covering all the chemicals / gases handled by BSL is already in place. The same shall be upgraded and extended to the units under the expansion programme of BSL. The assessment has been made in a systematic manner covering the requirements of the abovementioned rules. Accordingly subsequent sections have been divided as follows: ≠ Brief Process description ≠ Applicability of the rule ≠ Description of hazardous substances ≠ Hazard Identification ≠ Hazard Assessment (& hazard scenarios) ≠ Consequence analysis ≠ Brief description of the measures taken and ≠ On site emergency plan 3.2. Brief Process Description BSL is producing steel products via BF- BOF Route of steel making. Iron ore lumps, sinters and coke (made from coking coal) and fluxes such as limestone, dolomite are the major raw materials. The major steps in the manufacturing process are as follows: ≠ Coke making - coal carbonisation ≠ Sintering ≠ Hot metal production (blast furnace) ≠ Steel production (basic oxygen furnace) ≠ Continuous casting Page 2 of 32 Page 3 of 32 HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Bokaro Steel plant HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT The detailed analysis of the plant processes at BSL indicates that the process of Iron & Steel manufacturing via BF-BOF route requires considerable thermal energy. This thermal energy is supplied through fuel gasses generated in the plant e.g. Coke oven gas (COG), Blast Furnace gas (BFG), BOF gas as well as LPG/Propane gas. If there is any shortfall of these generated gasses then fuel gas is also supplied from outside source also. The present proposal of BSL for expansion will create additional energy requirements, which will be catered to by in-plant COG, BFG, BOFG and/or Mixed Gas. In addition, use of LPG/Propane has also been considered for catering to the cutting requirements of SMS, Caster and auxiliary shops. In addition to these fuel gasses, a number of chemicals are being produced in the by-product plant of Coke Oven. Further Oxygen is also required as mentioned above. Therefore to run the plant, it is required to store and/or handle all these chemicals along with their distribution arrangement. The expansion-cum modernization programme of BSL primarily envisages replacement as well as installation of new storage facilities such as replacement of existing BOF gas holder (50,000 m3) in modernized SMS-1, new BOF Gas holder in SMS-II (80,000 m3),and revamped existing Propane storages of 2 x 100 tonnes within the SMS complex to meet its requirements. The major hazardous materials to be stored, transported, handled and utilized within the facility have been summarized in Table 1: 3.3. Applicability of the MSIHC Rules As per MSIHC Rules, 1989 with subsequent amendments, the galvanization process is classified as an “industrial activity” storing/handling hazardous substances. To decide whether the above mentioned industrial activities/substances are likely to come within the scope of the above mentioned “Manufacture Storage and Import of Hazardous Chemicals Rules, 1989 & subsequent amendments”, the threshold quantities mentioned in the rules are used for comparison, as given in Table 2. Table-2. : Threshold Quantity & Identified Hazardous Substances to be Handled as per MSIHC Rules, 1989 & Subsequent Amendments Sn Hazardous substance handled/ stored Hazardous Quantity handled/ Type of vessel used for handling Nature of substance stored / storage hazard handled/stored associated 1 1. Coke Oven gas (major 2.5 tonnes handled In-plant Steel pipelines to new Gas Flammable Mixing Station (GMS) gas components being CH4, via in-plant piping H2 and CO) network 2 2. Blast Furnace Gas 86 tonnes handled In-plant Steel pipelines to new GMS. Flammable via in-plant piping gas network 3 3. Mixed Gas 81 tonnes handled In-plant Steel pipelines from new Flammable GMS. gas via plant piping network Stored in steel Cylindrical shaped gas 4. BOF gas1 102.1 T + 63.8 T = Flammable gas 165.9 Tonnes stored holder (Wiggin’s type) with Dry Rubber seal and handled via In-plant Steel in 02 BOF Gas pipelines holders Horizontally placed steel Bullet with 5. Propane 2 x 100 T = 200 Flammable hemispherical ends. Tonnes stored in 02 pressurized bullets liquid Note:1Coke Oven Gas density as 0.499 kg/m3 calculated at 25°C, 1 atm pressure conditions considering tentative gas mixture composition 2Blast Furnace Gas density 1.145 kg/m3 as calculated at 25°C, 1 atm pressure conditions considering tentative gas mixture composition 3Mixed Gas density as 1.08 kg/m3 calculated at 25°C, 1 atm pressure conditions 4BOF Gas quantity computed considering density as 1.37 kg/Nm3 Page 4 of 32 Maximum Quantity handled/ stored Whether Type of vessel Included in The used for handling / List of Hazardous & storage Toxic Chemicals Lower Threshold Qty. (In Tonne) [For Upper Threshold Qty. (In Tonne) [For Remarks In-plant Steel pipelines to new Gas Mixing station (GMS) In-plant Steel pipelines to new GMS 15 200 15 200 Below the lower threshold limit. Does not require additional However, consequence analysis carried out due to COG’s high flammability potential Exceeds lower threshold limit but below upper threshold limit. Consequence analysis required to be carried out. Exceeds lower threshold limit but below upper threshold limit. Consequence analysis required to be carried out. Exceeds lower threshold limit but below upper threshold limit. Consequence analysis required to be carried out. rules 5,7 to 9 & 13 to 15] rules 10 to 12] 1. Coke Oven 2.5 tonnes gas handled Yes, As per Sch. 3(i) 2. Blast Furnace Gas 86 tonnes handled Yes, As per Sch. 3(i) 3. Mixed Gas 81 tonnes handled Yes, As per Sch. 3(i) In-plant Steel pipelines from new GMS 15 200 4. BOF gas 102.1 T + 63.8 T = 165.9 Tonnes stored in 02 BOF Gas holders Yes, As per Sch. 3(i) 15 200 5. Propane 2 x 100 T = 200 Tonnes stored in 03 bullets Yes, As per Sch. 3(i) Steel Cylindrical shaped gas holder (Wiggin’s type) with Dry Rubber seal and handled via Inplant Steel pipelines Horizontally placed steel Bullets with hemispherical ends. 15 200 Table-1. : List of Major Hazardous Substances to be Stored /Handled Sn. Bokaro Steel plant Equal to upper threshold limit. Consequence analysis required to be carried out. After comparison of the stored / handled and threshold quantities, it can be noticed that BOF gas and propane exceed the lower threshold limits and come under the purview of MSIHC Rules, 1989 amended in 2000. Accordingly, Rule-7 i.e. notification of site requires submission of a written report containing among other information. Further, rule 17 i.e. preparation and maintenance of material safety data sheets are required for both the substances. Page 5 of 32 HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Bokaro Steel plant Owing to the hazardous nature of BOF gas, Mixed gas and propane, consequence analysis of the facility has been done, taking in consideration all hazardous substances identified at Table 2 above. MCAA (maximum credible accident analysis) approach has been used to identify plausible worst case scenarios for hazard identification and risk assessment. 3.4. Hazard Identification Hazards associated with the identified hazardous chemicals based on NFPA (National Fire Protection Association) ratings as well as other parameters are presented in Table 3. Table-3. : Type of Hazards Associated With Identified Hazardous Chemicals Type NFPA Hazard Rating Flash Flammability Remarks IDLH of point range (for Health Flammability Reactivity Value Hazard (°C) gases) LEL = 4% 1,6,9 0 4 0 Hydrogen (<13%) All gases LEL = 4.4% 1,6,9 2 4 0 Methane transported (<13%) directly through 1200 Carbon LEL = 12% pipelines. 2 4 0 1,3,9 Release: (<13%) ppm monoxide Leak/rupture 300 LEL = 16% 3 1 0 Ammonia(NH3) 4,8 LD gas stored in ppm UEL = 25% Steel Gas holders. Hydrogen 100 LEL = 4.3% Release: Leak/ 1,4,8 4 4 0 ppm UEL = 46% sulphide(H2S) Rupture 250 LEL = 0.9% 1,7,8 2 2 0 79° Naphthalene UEL = 5.9% ppm Constituents of COG/ BFG/ BOFG/ Mixed Gas Name of Chemical Propane (C3H8) 1,3,9 2 4 Note: IDLH: Immediately Dangerous to Life or Health Type of Hazard : 1 Flammable substance 2 Oxidising substance, reacts with reducing agents 3 Emits a toxic gas or vapour 4 Emits an irritating gas or vapour 5 Emits a narcotic gas or vapour NFPA HAZARD Rating a) HEALTH 1 - None 2 - Minor b) FLAMMABILITY 1-None, Material 2- Minor, material does not burn must be preheated to ignite c) REACTIVITY 1-None, stable when exposed to fire 0 2100 -104° ppm LEL = 2.2% UEL = 9.5% HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Bokaro Steel plant which also confirms high levels of safety of mounded bullets, diminishing possibilities of BLEVE from the bullets. The summarised The catastrophic potential of a hazardous substance depends on its flammability, toxicity and volatility. The ambient temperature vapour pressure of a substance is used as a measure of the ability to become air borne. Although COG, BFG and Mixed gas are not proposed to be stored in the plant and also, as per applicability of MSIHC Rules, 1989, there is no specific requirement for carrying out its consequence analysis, the fire hazards associated have been quantified owing to its toxic as well as high flammable nature. BOF gas and propane being highly flammable and stored in significant quantities in the plant require consequence analysis to be carried out for them. The primary potential hazards due to the identified hazardous facilities is summarised in Table-4 as below. Stored in mounded bullets. Release: Leak/rupture 6 Gas or vapour not dangerous other than displacing air 7 Causes skin irritation or burns 8 Toxic substance 9 Explosive material under certain conditions 3 - Moderate, could 4 - Severe, short 5 - Extreme, short cause temporary exposure may cause exposure may cause incapacitation or injury serious injury death 3- Moderate, moderate 4- Severe, material heating is required for ignites at normal ignition and volatile temperature vapours are released 2-Minor, unstable at 3-Moderate, unstable high temp. or press but does not explode, and may react with may form explosive water mixture with water 4-Severe, Explodes if heated or water added 5- Extreme, very flammable substance that readily forms explosive mixtures 5-Extreme, readily explosives under normal condition From the above table it can be observed that Coke Oven gas, BF gas, BOF gas, mixed gas and propane are the hazardous materials of concern for the proposed project. Propane is proposed to be stored in mounded bullets, as per the design guidelines of OISD-150, Page 6 of 32 Page 7 of 32 HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Bokaro Steel plant HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Table-4. : Primary Hazard Analysis of Proposed facilities Unit/ facility Hazardous activity Failure Scenario Nature of Potential Hazard SMS-I Storage of BOF gas Failed tank or associated fittings, ≠ Fire and explosion (modernized holder) pump or pipework or operator ≠ Toxic cloud dispersion error or mechanical damage Storage of BOF gas Failed tank or associated fittings, ≠ Fire and explosion (new holder) pump or pipework or operator ≠ Toxic cloud dispersion error or mechanical damage SMS-II Storage of BOF gas Failed tank or associated fittings, ≠ Fire and explosion (new holder) pump or pipework or operator ≠ Toxic cloud dispersion error or mechanical damage Storage of Propane Failure in inlet, outlet or vapour ≠ Fire and explosion gas (modernized balancing line or associated holder) fittings, pump or pipe-work or operator error leading to impacts including chemical or fuel contamination Unit/ facility Hazardous activity Control measures ≠ Design of storage structures / tanks to relevant standards and legislations. ≠ Regular inspections and maintenance. ≠ Operator induction and ongoing training. ≠ Operational procedures. ≠ Material safety data sheet (MSDS) register and MSDSs kept on-site at different locations in form of signage etc. ≠ Hazard Signage. ≠ Design of storage structures / tanks to relevant standards and legislations. ≠ Appropriate storage of all chemicals, fuel and dangerous substances in accordance with relevant Hazardous Chemical Rules, 2000 with subsequent amendments and associated legislations. ≠ Housekeeping activities – site would be kept clean and tidy and fire hazards removed where practicable. ≠ Availability of firefighting equipment, such as overhead water spray system, mounted on top of gas holders. ≠ Regular inspections and maintenance of firefighting equipment and storage areas, where required. ≠ Site policies, management plans and procedures. ≠ Protection of storage facilities (e.g. bollards). ≠ Operator induction and ongoing training. ≠ Location of explosive storage should be such that it has minimum interaction with people and property. ≠ Design of storage structures / tanks to relevant standards and legislations. ≠ Design of pipelines (i.e. wall thickness and stress relief), well sites, Central Processing Facility and related infrastructure to relevant standards and legislation. ≠ Installation of pressure monitoring systems. ≠ Regular inspections and maintenance. ≠ Housekeeping activities – site would be kept clean and tidy and fire hazards removed where practicable. Page 8 of 32 Coke plant Failure Scenario Nature of Potential Hazard Oven Handling of Coke Failure of pipeline, bursting of ≠ Fire and explosion oven gas and BF gas pipeline due to Corrosion, ≠ Toxic cloud dispersion (new Gas mixing Vibration, external loading, station) Operation error, Over pressure, Maintenance failure, or Sabotage Bokaro Steel plant Control measures ≠ Availability of firefighting equipment. ≠ Maintenance of fire breaks to slow the progress of bushfires. ≠ Routine hazard reduction burns. ≠ Fire-fighting equipment located in on-site vehicles and infrastructure (wherever appropriate). ≠ Regular inspections and maintenance of firefighting equipment and storage areas, where required. ≠ Operator induction and ongoing training. ≠ Operational procedures. ≠ Material safety data sheet (MSDS) register and MSDSs kept on-site at different locations in form of signage etc. ≠ Hazard Signage. ≠ Location of explosive storage shall be such that it has minimum interaction with people and property. ≠ Design of pipelines (i.e. wall thickness and stress relief), well sites, Central Processing Facility and related infrastructure to relevant standards and legislation. ≠ Installation of pressure monitoring systems. ≠ Conduct regular inspections, maintenance and testing of equipment. ≠ Site policies, management plans and procedures. ≠ Operator induction and ongoing training. ≠ Maintenance of fire breaks to slow the progress of bushfires. ≠ Routine hazard reduction burns. ≠ Fire-fighting equipment and spill kits located in on-site vehicles and infrastructure (where appropriate). ≠ Restriction of access to storage areas, including securing storage facilities. ≠ Provision of adequate lighting around storage facilities. ≠ Signage (i.e. unauthorized entry warning and information signs). ≠ Police would be notified as soon as possible in case of a suspected breach. Page 9 of 32 HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Bokaro Steel plant 3.5. Consequence Analysis for fire and explosion as well as toxic hazards Subsequent to the accidental release of hazardous chemicals, the consequence depends on various factors e.g. type and inventory of released hazardous materials, presence and location of an ignition source, meteorological conditions, etc. Consequence analysis for the selected accident scenarios has been carried to estimate the vulnerable zones. DNV’s PHAST (Version 6.4) software, which is a consequence and risk assessment software for calculation of physical effects (fire, explosion, atmospheric dispersion) of the escape of hazardous materials has been used to perform the consequence calculations. The software allows detailed modeling and quantitative assessment of release of pure chemicals as well as mixtures from different scenarios. Consequence analysis quantifies vulnerable zone for a conceived incident and once the vulnerable zone is identified for an incident, measures can be proposed to eliminate damage to plant and potential injury to personnel. Consequence analysis for existing BOF gas stored in gas holders, additional COG, BFG and Mixed Gas proposed to be handled via pipelines of new Gas mixing station and Propane envisaged to be stored in Mounded bullets at BSL has been carried out. The release scenarios selected and associated hazards based on MCA Analysis are listed below in Table 5. HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Bokaro Steel plant Table-6. : Worst Case Hazard Extents for Identified Hazardous Facilities Plant Unit Failure size Nature of hazard Hazard effects GAS Hole Fire & Explosion Jet fire MIXING Flash Fire STATION Rupture Fire & Explosion Fireball Flash Fire Vapour Cloud Explosion Toxic effect Toxic effect safe distance BOF GAS Rupture Fire & Explosion Fireball HOLDERS Flash Fire Vapour Cloud Explosion Toxic effect Toxic effect safe distance MOUNDED Vessel failure Fire & Explosion Jetfire PROPANE at pipe Flash Fire BULLET junctions Vapour Cloud Explosion Worst case Hazard extent (m) 11m @ 4.0 kW/m2 8m @ LFL 38m @37.5 kW/m2 65m @LFL 48m @0.21 bar(g) > 25m @ no probability of fatality 84m @37.5 kW/m2 127m @LFL 136m @0.21 bar(g) > 50m @ no probability of fatality 45m at 12.5 kW/m2 8m @ LFL 45m @0.21 bar(g) The worst case Hazard extents of all identified major hazardous units is shown in Figures. 1(a) to 1(f). Table-5. : Probable Release & Accident Scenarios Identified as per MCAA Sl. No. 1. 2. 3. Hazardous substance BOF gas Credible Release scenario Credible identified accidents Complete failure of Gas holder leading to Fireball, Flash fire, Vapour Cloud catastrophic release of BOF gas explosion, Toxic Cloud dispersion Propane Complete failure of inlet-outlet and other Fireball, Flash fire, Vapour Cloud lines connected to the bullets leading to explosion release from connecting points. Coke Oven Leak from hole (100mm dia. hole) [for Jet fire, Flash fire Gas, BF Gas, COG only] Mixed gas Full bore rupture of piping [for all gases] Fireball, Flash fire, Vapour Cloud explosion, Toxic Cloud dispersion The modelling of hazardous situations using DNV’s PHAST indicate the hazardous consequences have highest hazard extents in the atmospheric stability class D. The worst case results for the different releases enumerated above have been observed in the atmospheric scenario similar to 3D. The worst case results are summarized in Table 6. For assessing maximum damage from most credible scenarios, results have been shown for end point criteria corresponding to maximum observed damage due to a particular hazard effect. Page 10 of 32 Page 11 of 32 HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Bokaro Steel plant HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Fig.1 (a) Hazard Extents For Thermal Fire Radiation Effects GAS MIXING STATION WITH ASSOCIATED PIPEWORK BOF GAS HOLDERS Page 12 of 32 Bokaro Steel plant MOUNDED PROPANE BULLET Page 13 of 32 HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Bokaro Steel plant HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Fig.1 (b) Hazard Extents For Flash Fires In Identified Hazardous Facilities GAS MIXING STATION WITH ASSOCIATED PIPEWORK BOF GAS HOLDERS Page 14 of 32 Bokaro Steel plant Fig.1 (c) Hazard Extents For Flash Fires In Identified Hazardous Facilities MOUNDED PROPANE BULLET Page 15 of 32 HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Bokaro Steel plant HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Fig.1 (d) Hazard Extents For Vapour Cloud Explosion Effects In Identified Hazardous Facilities GAS MIXING STATION WITH ASSOCIATED PIPEWORK BOF GAS HOLDERS Page 16 of 32 Bokaro Steel plant Fig.1 (e) Hazard Extents For Vapour Cloud Explosion Effects In Identified Hazardous Facilities MOUNDED PROPANE BULLET Page 17 of 32 HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Bokaro Steel plant The proximity of nearest habitations to Identified Hazardous facilities is shown in Figure 2 below: HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Bokaro Steel plant Fig.1 (f) Hazard Extents For Toxic Cloud Dispersion Effects In Identified Hazardous Facilities GAS MIXING STATION WITH ASSOCIATED PIPEWORK BOF GAS HOLDERS Fig.2 Safe Distances From Hazardous Installations Of BSL To Nearest Habitations Page 18 of 32 Page 19 of 32 HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Bokaro Steel plant HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT 3.6. Conclusion on consequence analysis Bokaro Steel plant 3.6.3. Mounded Propane bullet BSL has envisaged two (2) propane bullets, each of 100Tonne capacity, located within the BSL’s Bokaro Steel Plant for heating and cutting purposes. The results of MCA analysis indicates a maximum fire hazard distance for causing significant damage (@12.5 Kw/m2 thermal radiation) extending up to 45 m in the case of complete failure of the pipeline connections on the bullets and release of propane, subsequently being ignited during worst meteorological conditions resulting in a jetfire. Explosion effects having significant potential for damage (@0.21 bar(g) overpressure) is also observed to be upto a distance of 45 m. 3.6.1. Gas Mixing station A maximum total of 75,000 m3/hr of mixed gas is proposed to be handled by a new Gas mixing station envisaged at BSL’s Coke Oven complex, wherein BF Gas and Coke Oven gas will be tapped from existing as well as future producing units and will be mixed in suitable proportions to produce Mixed gas of desired calorific value for use at the existing and new coke oven batteries. The results of MCA analysis indicates a maximum fire hazard distance for causing significant damage (@37.5 Kw/m2 thermal radiation) extending up to 38 m in the case of complete failure of the holder and catastrophic release of BOF gas, subsequently being ignited during worst meteorological conditions resulting in a fireball. The hazard extent for flash fire extends till 65 m (@ LFL concentration). Explosion effects having significant potential for damage (@0.21 bar(g) overpressure) is observed to be upto a distance of 48m. Overall, a minimum safe distance of 45 m from the Propane bullets will ensure no damage to personnel as well as property, outside the plant premises. As observed from the overall analysis, the hazard extents will be contained within the plant premises and will not extend beyond plant boundary into any nearby settlement in the area. Also, pressure-monitoring systems shall be installed to detect leaks or cracks in the pipeline. Fire-fighting facilities will also be installed to check any fire incident that may occur. The toxic effect of BFG, COG as well as Mixed gas (attributed to presence of Carbon Monoxide in the gases) will be limited to 25m from the gas holder, beyond which there will be no probability of fatality due to toxic effect in case of a release. 3.7. Risk Analysis for proposed projects Overall, a minimum safe distance of 65 m from the Gas mixing station will ensure no damage to personnel as well as property, outside the plant premises. As observed from the overall analysis, the hazard extents will be contained within the plant premises and The hazardous event scenarios likely to make the significant contribution to the risk of potential fatalities are enlisted in Table 7. The risks to people at plant site are categorized as “On-site” risks while the risks to communities outside the plant premises is categorized as “Off-site” risks. will not extend beyond plant boundary into any nearby settlement in the area. 3.6.2. BOF Gas holders Table 7: Hazardous Events Contributing to Risk and their Risk Ranking There are two (2) BOF gas holders, i.e. a replaced BOF gas holder of SMS-1 of 50,000 m capacity and a new gas holder of 80,000 m3 capacity, both located within the SMS complex of BSL’s Bokaro Steel Plant. The results of MCA analysis indicates a maximum fire hazard distance for causing significant damage (@37.5 Kw/m2 thermal radiation) extending up to 84 m in the case of complete failure of the holder and catastrophic release of BOF gas, subsequently being ignited during worst meteorological conditions resulting in a fireball. Explosion effects having significant potential for damage (@0.21 bar(g) overpressure) is observed to be upto a distance of 136m. (A) 3 The toxic effect of BOF Gas (attributed to Carbon Monoxide in BOFG) will be limited to 50m from the gas holder, beyond which there will be no probability of fatality due to toxic effect in case of a release. Overall, a minimum safe distance of 136 m from the BOF Gas holders will ensure no damage to personnel as well as property, outside the plant premises. As observed from the overall analysis, the hazard extents will be contained within the plant premises and will not extend beyond plant boundary into any nearby settlement in the area. Page 20 of 32 Sn. Hazardous event Consequence of significant damage Consequence severity* (1=least severe; 5=most severe) 1. 2. Onsite vehicle impact on personnel Entrapment/struck by Machinery 3. Fall from heights 4. Electrocution 5. 6. 7. Potential for single fatalities, onsite impact only Potential for single fatalities, onsite impact only Potential for single fatalities, onsite impact only Potential for single fatalities, onsite impact only Gas Mixing Station fire & Potential for multiple explosion as well as toxic fatalities, onsite impact only dispersion BOF gas holder failure and Potential for multiple fire & explosion as well as fatalities, onsite impact only toxic dispersion Potential for multiple Propane Bullet’s fire & fatalities, onsite impact only explosion (B) Likelihood* (1=least likely; 5=most likely) C= A*B RISK RANK 3 3 9 3 2 6 1 3 3 2 3 6 4 1 4 5 1 5 3 1 3 *based on Historical survey of similar facilities Page 21 of 32 HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Bokaro Steel plant The above risk analysis indicates that although the most severe consequences will be due to rupture of BOF Gas holders followed by Gas Mixing station and Mounded propane bullets, their chances of occurrences are low due to implementation of better safety features in the installations and constant monitoring of vessel/pipework integrity for regular repair and maintenance, and hence these facilities have low levels of risk in the facility. HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT ≠ ≠ ≠ 3.8. Summary & Conclusions of Risk Assessment The risk assessment and analysis for BSL’s steel plant for most severe hazardous events is broadly summarized below: ≠ ≠ The nearest habitations in the vicinity of the BSL Plant are Tupkadih village at distance >4000min NW, Balidih village at distance >3000m in SW, LakdaKhanda village in SEat distance >2500mand Agardih village at distance >2300m in the NE, which are far away from the hazard distances observed for thermal effects (maximum at 127m) as well as toxic effects (maximum at 50m) due to failure of above identified hazardous facilities of BSL. Also, these facilities are located in the central part of the Bokaro steel plant away from each other to prevent multiple hazards, initiated due to fire in one facility and leading to a hazard in another facility, also known as domino effect. So, there will be no significant impact on the local community or damage to property / environment. The most severe damage effects due to the identified hazardous facilities will be limited to the plant premises and adequate safety controls as well as implementation of recommended control strategies in the design as well as operation stage will ensure effective management of the associated risks. ≠ ≠ ≠ ≠ ≠ Bokaro Steel plant - First-aid appliances Personal Protective Equipment (PPE) shall be provided for additional protection to workers exposed to workplace hazards in conjunction with other facility controls and safety systems. Restricted access to these areas to have minimum casualties in an event of exposure. The onsite Emergency Plan will be integrated with the Bokaro district’s Offsite Emergency Plan for comprehensive management of emergencies in minimum response time and maximum rescue results in an event of a disaster /emergency. Co-ordination with nearby industries will also be maintained for creating unified Disaster management resource pool to be utilised in case of any disaster occurrence. The plant structures shall be designed for cyclone floods and seismic events to prevent structural collapse and integrity of weather (water) proofing for storage of dangerous goods. Isolate people from load carrying/mechanical handling systems, vehicle traffic and storage and stacking locations. Security of facility to prevent unauthorized access to plant, introduction of prohibited items and control of onsite traffic; and Development of emergency response management systems commensurate with site specific hazards and risks (fire, explosion, rescue and first aid). Regular safety audits shall be undertaken to ensure that hazards are clearly identified and risk-control measures are maintained within tolerable limits. Bokaro Steel plant has a well laid down Onsite-emergency plan for the existing plan. The same will be extended to the proposed modernization and expansion projects also. 3.9. Recommended Risk Reduction and Mitigation Measures The following opportunities shall be considered as a potential means of reducing identified risks during the detailed design phase: ≠ The zones identified from consequence modelling as affected areas due to ≠ ≠ thermal radiations greater than 12.5 kW/m2 shall be marked as “Heat Zones” and provisions for fire fighting will be made available close to these zones. It is also recommended to provide portable gas detectors within the site in order to facilitate manual gas leak monitoring and regular leakage checks. Constant monitoring of gas leak shall be ensured for immediate identification of leaks and subsequent implementation of action plan to prevent development of any hazardous situation. Further, all major units / equipment shall be provided with the following safety facilities: - Smoke / fire detection and alarm system - Water supply - Fire hydrant and nozzle installation - Foam system - Water fog and sprinkler system - Mobile fire-fighting equipment Page 22 of 32 Page 23 of 32 HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Bokaro Steel plant HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Additionally, the HAZOP study for existing gas holder in SMS-II is also attached with Annexure-1B. 4. HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA) FOR EXISTING FACILITIES Bokaro Steel plant has a well-defined procedure for carrying out Hazard identification and Risk Assessment for effective risk control management at each unit of the plant. The procedure has been laid down based on the principles and standards of OHSAS-18001 and is continually reviewed for upgradation and improvement. All new works are also required to carry out HIRA before commencement and the same is updated as and when these ongoing projects are completed. The HIRA under implementation for the following existing units are detailed hereunder i. Energy Management Department (Fuel gases etc.) ii. New Gas pipeline network iii. Blast Furnace iv. Coke Oven and By-product plant v. Steel making Shop vi. Cold Rolling mill vii. Sinter Plant viii. Raw Material handling plant The summarised HIRA indicating major hazards, probable risk and control measures employed are indicated in Table-9(a) below. Sl. No. Activity 1. 2. Note: Risk level is Tolerable on the basis of probability up to unusual but possible, exposure up to Occasional & Consequence is First aid. For NOT ACCEPTALE cases, Risk Control measures have to be taken as per Hierarchy of control. 4.1. Fuel Management : Gaseous And Liquid Different liquid and gaseous fuel are used in various departments of BSL during plant operations and are managed by Energy Management Department (EMD) of BSL. The details of HIRA for storage and handling of these fuel is managed by EMD BSL. Page 24 of 32 Table 9(a): Summarised HIRA of fuel management Hazard Risk Risk level Existing measure Distribution of in-house Byproduct fuel gases Charging of the gas cleaning plant 3. Rectification of defects in charged gas line 4. Standard Maintenance Practices risk control Gas leakage Gas Exposure Substantial Gas Monitors & Alarms Gas leakage & Formation of explosive mixture Gas leakage Gas Exposure Moderate & Explosion Adherence procedures Gas exposure Substantial Flash over + Elec. Shock Injury & burn Moderate Strict adherence to Gas line work Protocol and use of PPE Adherence to safe work procedures to safe work 4.2. Alternate Gas pipeline network The HIRA carried out for t he new gas network and associated repair and maintenance works is summarised below. The summary of HIRA for the above mentioned units are briefed below, indicating major hazards, probable risks and their levels and control measures employed. The risk acceptance criteria at Bokaro Steel plant is given in Table-8 below: Table 8: Risk levels and their acceptance criteria at BSL Score Risk level Risk Assessment Risk Control Measures 400 & Very high Not Acceptable PPE + Engg Control/ Modification or >400 combination to REDUCE RISK LEVEL 200-399 High Not Acceptable PPE+ OH&S Program for engineering control along with RCP 60-199 Substantial Not Acceptable PPE+ RCP / OH& S Program / Signages /warning boards and/or/ administrative controls ( or combination) 10-59 Moderate Not Acceptable PPE + RCP/ Signages / warning boards and/or/ administrative controls ( or combination) Upto 9 Tolerable Acceptable PPE Bokaro Steel plant The summarised HIRA indicating major hazards, probable risk and control measures employed are indicated in Table-9(b) below. Table 9(b): Summarised HIRA of installation of alternate Gas pipeline network Sl. Activity Hazard Risk Risk Existing risk control No. level measure Electrical Electrocution Burn injury or fatal or Moderate Lockout/Tag out, Work 1. Installations 2. Welding lost time injury Electric shock due to unearthed welding machine / Transformer Electric shock due to exposed joints of welding cable Electric shock due to loose connections without industrial plug tops Burn injury due to the contact with hot surfaces Fatal or Cut injurys/burns/Electric shocks. Burn, Fire, Permit, Daily Checklist, etc. Strict Supervision is required from start of work to till completion of work Tolerable Work Permit, Daily Checklist, ELCBs, PPEs, Area barricading, Use of sheets Tolerable Exposure to Eyes, Breathing problems, Occupational Diseases. Tolerable Burn injury Tolerable Page 25 of 32 HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Sl. Activity No. Material 3. handling (Manual) 4. 5. 6. 7. Bokaro Steel plant Hazard Risk Risk level Non-use of PPE's (Helmet, gloves, shoes etc.) Inadequate manpower Lack of concentration in group effort Wrong body posture Lifting error Bur/sharp edges /corners / projecting parts /protruding nails. Fall of materials Injury Tolerable Adherence to safe work procedures defined for Handling Of Reinforcement & Tolerable Handling Of Cement / Tolerable Concrete Competent riggers, Tolerable Use of Proper PPEs, Guy Tolerable ropes, Training & Awareness. Material Lack of knowledge handling Defective equipment (Mechanical) Defective lifting jacks forklift, Overloading crane Improper Slinging Untrained operator/ Rigger Working at Fall of Men & Material Height Back pain, sprain etc. Property damage Accident / injury Back pain,sprain etc. Property damage Serious injury or Lost time injury Accident / injury Impact, crush injury Impact Tilting of jacks / boom Impact, Collision Injury due to accident and property damage Major injury, Fatal Transporting Cylinders kept horizontal gas & near by cylinders: Cylinders with no valve Oxygen, cap Acetylene, Prolonged cylinder Argon, exposure to sun light Nitrogen, LPG Fire & explotion Work in Oxygen deficiency near CO gas Fire hazard line Asphyxiation Burn Injury Gas leakage due to valve damage Explosion Existing risk measure HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT control Tolerable Tolerable 4.3. Blast Furnace T h e H I R A c a r r i e d o u t f o r t h e B l a st Furnace complex and associated documents are summarised below. The summarised HIRA indicating major hazards, probable risk and control measures employed are indicated in Table-9(c) below. Sl. Activity No. Receiving, 1. Page 26 of 32 Hazard Table 9(c): Summarised HIRA of BF complex Risk Risk Existing risk level measure Dust concn. at the Skip Transporting, Pit Screening, Hot Sinter Storing and Unguarded coupling Bottom charging Spillage of oil from of raw G/Boxes materials. Spillage of raw Materials Tolerable Adherence to safe work Tolerable procedures defined for Tolerable mechanical material handling Tolerable Tolerable Tolerable Tolerable Adherence to safe work procedures defined for work at height. Height pass shall be implemented, Work shall be carried out under direct supervision of TPL, OCP-07 control measures shall be followed. Proper working platform shall be made where ever it is possible, proper temp. Ladders should be provided to access the height. Tolerable Adherence to safe work procedures defined for Tolerable working with gas storages. Material secured before Tolerable transporting. Material mobilizing only with strict supervision & preplanning using suitable transporting methods on the basis of right vehicle, right material, lashing is done only by trained persons. Tolerable Portable CO detector. Use Tolerable proper PPEs (like nose mask). Skilled & Trained person only should carry out. Bokaro Steel plant 2. 3. 4. 5. Receiving Cold Blast from TBS, Heating of Cold Blast in Stoves, Feeding of Hot Blast through Tuyeres. Tapping of Hot Metal and Slag in Cast House. Granulation of Liquid Slag. Handling of Raw CDI Coal in Sinter Galleries. Gas poisoning due to Heating of Stoves, Leakage of BF gas at Stoves, Dust Catcher, Cooling platforms, Walkways etc. Noise & Heat due to Air Leakage in Snort Valves, Stoves on Blast, Leakage of Hot air through Tuyeres. Emission of Flame, spark and back fire due to Drilling & lancing of tap hole Splashing of metal / slag during preparation / Cleaning of trough and runner before and during tapping Rolling of ladle, tilting, splashing during Coupling / decoupling metal & Slag Asphyxia. Consumption Burn Injury Severe Injury Slip & Fall Minor Injury control Substantial Dust extraction system / Use of PPE Moderate Water spray Substantial Provision of guards wherever missing Moderate Changing / Repair of defective Gear Boxes Tolerable Manual cleaning From Minor Health injury to even Death Substantial Checking of gas conc.& Use of PPEs, Repair/ Changing of leaking valves in Stove. Dust Catcher. Use of Gas Mask. Impaired Hearing & injury Substantial Use of PPEs. Changing of Tuyere/ Tuyere stocks. Eye injury and Burn Injury Moderate Heat resistant dress, Goggles & fire resistant dress. Burn injury Moderate Use of fire retardant dress and face shield etc. Run Over/ Hit/Pressed and Burn Substantial Track maintenance, Coupling at dead speed of loco & no overfilling of ladles. No work on the top of the tracks at cast house during placement & withdrawal of loads. Provision of handle. Moderate Aprons & Hand gloves, PPEs Hot water & Steam. Corrosive slag Burn injury Coal dust concentration Health injury as well as Burn Injury Substantial Dust mask, Special Dress. Page 27 of 32 HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Sl. Activity No. Chg. & 6. 7. 8. 9. Hazard Gas leakage Discharging of Gas Lines. Puncturing / ≠ Liquid metal / slag Bursting out splashing of Blow Pipes ≠ Splinter of hot pieces / Tuyere of B/Pipes Stocks Explosion in ≠ . Liquid metal / slag Metal / Slag splashing ≠ Splinter of hot Pieces. Ladles Gas leakage in BF Area ≠ Poisonous CO gas leakage Bokaro Steel plant HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Risk Risk level Existing risk measure Serious Injury to fatal. Moderate Use of N2 in the operation. Severe Burn / Fatal or injury Substantial Wind reductions & Off Blast Falling from height, Gas poisoning May lead to fatal accident control Substantial Use of Safety belt wherever required. Physical Inspection by rods before stepping. Checking of gas & use of PPE Moderate Use of Gas mask during wind reduction / Off blast of the furnace or prevention of leakage from given point 2. Exposure to fine dust and heat 8. 9. 10. 13. Burn injury Foreign bodies in eyes & lung problem Breathing and lung problem Foreign bodies in eyes & lung problem. Burn injury 3. Quenching of hot coke Exposure to heat, dust, steam Burn injury & smoke exposure 4. Combustion of Coke oven/Mixed gas Exposure to CO/Mixed gas, explosion Gas exposure and burn injury 14. 15. Table 9(d): Summarised HIRA of Coke oven and BPP Hazard Risk Risk level Oven pushing 7. 12. The summarised HIRA indicating major hazards, probable risk and control measures employed are indicated in Table-9(d) below. Exposure to raw gas Risk Risk level Exposure to heat, gas, Burn injury, Breathing and lung problem Physical injury Tolerable Use of PPEs Burn injury Tolerable Use of hand Gloves Heat ,Exposure to hot tar Heat ,Exposure to hot tar sludge Exposure to Acid Hot spray in to eye / face Chemical exposure Tolerable Use of hand Gloves Eye protection with Tolerable Goggles Acid burn Distillation of Benzolised oil to produce Crude Benzol CO gas line flushing with Wash oil Conversion process for making sulphuric acid Heat hazard Exposure to steam Burn injury Moderate Use of apron rubber hand gloves Eye protective shields Moderate Use of PPE Heat hazard Burn injury Tolerable Use of PPE Exposure to acid, Heat hazard Irritation to eye giddiness Storage and pumping of tar for distillation Mixing of crystallized Naphthalene Hot tar Exposure Burn injury Moderate Use of gas mask & Eye protection Moderate Use of PPE Fall from height 11. The HIRA carried out for the Coke oven and by-product plant and associated documents are summarised below. Exposure to flame Exposure to hot APC water Exposure to coal dust Hazard BY-PRODUCT PLANT Cooling of coke Oven Gas Exposure to hot water 6. 4.4. Coke Oven and By-product plant Sl. Activity No. COKE OVEN Charging of coal 1. Sl. Activity No. Cleaning and regulation 5. Existing risk control measure Moderate Use of PPEs Tolerable Safe Work instructions Moderate Use of PPEs & medical checkup Moderate Moderate Use of PPEs & medical checkup. Safe Work instructions Moderate Insulation of operation cabin and use of PPEs Moderate Safe Work instructions and inspection by EMD Page 28 of 32 Bokaro Steel plant with water Flushing of Primary Gas coolers with Hot Tar Removal of Sludge from Tar decanter Loading, unloading & storage of Conc. Sulphuric Acid Exposure of naphthalene fumes Handling & Preparation of Exposure to Orthophosphoric Acid Orthophosphoric acid, solution, caustic lye caustic soda solution (NaOH) and other chemicals & its dozing Burn injury giddiness due to toxic vapor Chemical burn Existing risk control measure Moderate Railing on platform Tolerable Tolerable 4.5. Steel Making Shop The summarised HIRA indicating major hazards, probable risk and control measures employed are indicated in Table-9(e) below. Sl. No. Activity Tap Hole 1. Opening And Closing Table 9(e): Summarised HIRA of SMS shops Hazard Risk Risk level Existing risk control measure Flame Fume Heat exposure Hot metal/ slag Splashes Minor burn Injury Respiratory Illness Heat Stress Burn Injury Moderate Tolerable Tolerable Tolerable Maintain good house-keeping, flame retardant suits, observation glasses/ Face shield, safe work instruction, dust pad/mask, safety helmet, safety shoes, Anklets and safety hand gloves, training, ensure dryness of launder, ensure there is no water in thimble, use protecting sheet, Page 29 of 32 HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Sl. No. Activity Charging of 2. Hazard Heat exposure, Burn Injuries, hot metal/ slag splashes Moderate 3. Pouring of hot metal in to mixer barrel And to ladle Moderate 4. Ladle Heating Dust/ fume, fire/ flame, flying graphite Particle, heat exposure, hot metal/ slag splashes Co-oven gas Exposure scrap and hot metal in to The furnace Fire/ flame due to explosion in Side ladle Heat exposure Risk Burn Injuries, cuts/ wounds/crush injuries, heat stress Bokaro Steel plant Risk level Existing risk control measure Follow Work Instruction, maintain safe distance from furnace, PPESdust masks/pad, helmet, safety boot, hand gloves, anklet, blue glass, flam retardant suit/ canvass coat Follow Work Instruction, PPES- dust masks/pad, helmet, safety boot, hand gloves, anklet, blue glass, flam retardant suit/ canvass coat Portable CO gas monitor, Hazard Risk Fire, electrocution, fall hazard Burn injury, Tolerable electrical shock, physical injury Risk level Existing risk control measure Double earthed welding m/c, electrical connection through ELCB/RCCB, proper lug joints and insulated, adherence to safe work instructions, removal of flammable material from hot work areas, area barricading, fully insulated holders, Lock-out-tag-out procedures, use of PPEs. Heat stress Use of canvas / jeans coat during regulating/working on running burners Low T h e H I R A c a r r i e d o u t f o r t h e S i n t e r p l a n t is summarised below. Good house keeping The HIRA carried out for the CRM-III is summarised below. Table 9(f): Summarised HIRA of CRM-III Hazard Risk Risk level Existing risk control measure Sl. No. Activity Lifting operation Fall hazard 1. with crane Fire, gas leakage, explosion, fall hazard Injury, damage to equipment Tolerable Burn injury, discomfort, chemical poisoning, physical injury Tolerable The summarised HIRA indicating major hazards, probable risk and control measures employed are indicated in Table-9(g) below. Table 9(g): Summarised HIRA of Sinter plant Sl. Activity Hazard Risk Risk Existing risk control measure No. level Storage of raw material Dust, Injury Moderate Casing repair, dust mask 5. 6. The summarised HIRA indicating major hazards, probable risk and control measures employed are indicated in Table-9(f) below. Cutting Sl. No. Activity Welding 3. Bokaro Steel plant 4.7. Sinter Plant Discomfort/ Low toxic giddiness/ CO poisoning Burn Injuries Low 4.6. Cold Rolling Mill 2. HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Clearance of passage, Good housekeeping, area barricading, adherence to safe work instructions, proper signage, Crane load certificate Trolley with chains for gas cylinder transportation, use of valve cap, working condition pressure gauge, joint-less flashback arrestor, hosepipe, PPEs-safety helmet, shoes, face shield, leather hand gloves, apron, arm & leg guard, goggles, Provision for fire extinguishers/ sand/ water at site, Use of full body harness and lifeline during work at height, area barricading etc. Page 30 of 32 7. 8. 9. Crushing of coke breeze, flux etc. Blanking & de-blanking of gas line. Hearth light up, gas collector Sinter screening, cooling and despatch & storage Exhauster operation spillage Dust, noise Gas leakage Chest problems, deafness Injury Moderate Dusk mask, De-dusting unit, ear plug Heat, dust Burn injury Tolerable PPEs, allowing natural cooling Noise Deafness Tolerable Ear plugs Substantial Adherence to safe working procedures for Handling of fuel gases. 4.8. Raw material handling plant The HIRA carried out for the Raw material handling plant is summarised below. The summarised HIRA indicating major hazards, probable risk and control measures employed are indicated in Table-9(h) below. Table 9(h): Summarised HIRA of Raw material handling plant Sl. Activity Hazard Risk Risk level Existing risk No. control measure Unloading of Railway Uneven floor and manual slip & fall & Substantial Manual signal 1. wagon in Tippler Operation Manual operation in between wagons hand injury Body injury may be fatal system Page 31 of 32 HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) AT BOKARO STEEL PLANT Sl. Activity No. Conveying of raw 2. 3. 4. Hazard Un even condition of floor , material through series confined space between running conveyors of conveyors Stacking of raw material Un even floor condition with the help of Twin confined space between transfer car, Bed, & Stacker Boom Stacker in predefined Bed. Screening of raw Multi floor screen building materials Dust sound & vibration hazard Bokaro Steel plant Risk Risk level Existing risk control measure Slip & Fall , Body injury Hit by Object Substantial Regular cleaning of mud & slurry Substantial Deployment of skilled/Experienced personal Substantial Use of PPEs ear plug, nose pad, safety instruction 5. SAFE WORKING PROCEDURES FOR HIGH RISK ACTIVITIES Highly flammable gases as well as liquid metal is handled during the operations at Bokaro Steel plant on day-to-day basis. These activities viz. handling of hazardous gases as well as handling of liquid metal are categorised as High risk activities due to their higher damage potential, higher exposure levels despite lower chances of occurrence. BSL has defined safety procedures to be adhered to while handling hazardous gases as well as liquid metal in plant. These are elaborated in various Inter Plant Standard – Steel Industry (IPSS). 6. DISASTER MANAGEMENT PLAN & ON-SITE EMERGENCY PLAN The Disaster Management Plan (DMP) is formulated with an aim of taking precautionary measures to control the hazard propagation and to take such action that the damage following a disaster is the minimum. The on-site emergency plan relates to the laid-down and well-practiced procedure after taking care of all design based precautionary measures for risk control. This plan is aimed for tackling any emergency situation, if arises. Both the DMP and the onsite emergency plan for the existing Bokaro Steel plant has been already prepared by BSL. The same will be extended to the proposed units also. The overall Disaster Management Plan and the unit-wise onsite-emergency plan of Bokaro steel plant is attached as Annexure-3.2. Page 32 of 32 "OOFYVSFT
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )