PROJECT PROCEDURE WATER FLUSHING PROJ. 2171 DOC. NO. : IONE-AA00-PE-CM-0018 Rev. A KARBALA REFINERY PROJECT Page 1/21 Ref. FEED DOC. NO. : 2342-AA00-JSM-901 WATER FLUSHING PROCEDURE PROJECT : KARBALA REFINERY PROJECT LOCATION : KARBALA, IRAQ EMPLOYER : STATE COMPANY FOR OIL PROJECTS (SCOP) A 30 MAR 19 ISSUED FOR REVIEW J.S.HEO J.K.KWON REV. DATE DESCRIPTION PRPD CHKD Y.S.KIM Y.B.LIM H.S.HWANG REVD REVD APPRD CONFD (PQM) (PM) (PD) (SCOP) Joint Venture of Hyundai Engineering & Construction Co., Ltd., GS Engineering & Construction Co., Ltd., SK Engineering & Construction Co., Ltd., and Hyundai Engineering Co., Ltd., Note : a) Revision bar(vertical line) shall be placed in the right hand margin to indicate where the changes has been made b) PRPD = Prepared by, CHKD = Checked by, REVD = Reviewed by, APPRD = Approved by, CONFD = Confirmed by PROJECT PROCEDURE WATER FLUSHING PROJ. 2171 DOC. NO. : IONE-AA00-PE-CM-0018 Rev. A KARBALA REFINERY PROJECT Page 2/21 Ref. FEED DOC. No. : 2342-AA00-JSM-901 TABLE OF CONTENTS 1. INTORDUCTION.................................................................................................................... 3 1.1 Scope .............................................................................................................................3 1.2 Purpose ......................................................................................................................... 3 1.3 Application .................................................................................................................... 3 2. DEFINITIONS ......................................................................................................................... 3 3. REFERENCE .........................................................................................................................6 4. WORK FLOW ........................................................................................................................7 5. HSE .........................................................................................................................................8 6. PLANNING .............................................................................................................................8 7. 6.1 Package Preparation.....................................................................................................8 6.2 Notification of Inspection .............................................................................................9 6.3 Preparation of Tools, Measuring Devices and Supplies .............................................9 EXECUTION......................................................................................................................... 10 7.1 Pre-Work of Water Flushing .......................................................................................10 7.2 Execution of Water Flushing ...................................................................................... 11 7.2.1 Continuous Flushing ...................................................................................................... 12 7.2.2 Water Filling and Dumping Out ....................................................................................... 12 7.3 Acceptance Criteria ....................................................................................................13 7.4 Post Work of Water Flushing .....................................................................................13 8. DOCUMENTATION AND REPORTING ........................................................................... 13 9. ATTACHMENT .................................................................................................................... 14 PROJECT PROCEDURE WATER FLUSHING PROJ. 2171 DOC. NO. : IONE-AA00-PE-CM-0018 Rev. A KARBALA REFINERY PROJECT Page 3/21 Ref. FEED DOC. No. : 2342-AA00-JSM-901 1. INTORDUCTION 1.1 Scope This Procedure provides necessary information, general requirements and guidelines for Water Flushing method of water pipelines installed for Karbala Refinery Project. Detailed Water Flushing method shall be included on the marked up P&ID with water In / Out points and valve Open / Close status etc. 1.2 Purpose The purpose of Water Flushing is to remove loose foreign materials from the inside of utility, oil and gas pipelines (such as welding rods, sand, pebbles, nuts and bolts, tools, rags, etc.) in order to avoid line blockage and damage to sensitive instrument components such as orifice plates, thermocouples, control valve and rotating equipment and so on. 1.3 Application Water Flushing is one of the pipe cleaning method utilizing water kinetic energy and is carried out either cleaning by circulation of water or filling and dumping water. Attention has to be given to the potential corrosiveness of water and special water quality may be necessary. Specific cleaning medium for each service line is shown on the attachment #4. 2. DEFINITIONS Contract means the Contract Agreement, the Conditions, the Employ’s requirements, the Tender, and the further documents (if any) which are listed in the Contract Agreement. Party means the Employer or the Contractor, as the context requires. Employer means the person named as Employer in the Contract Agreement and the legal successors in title to this person. The “Employer” and reference to “Engineer” means the Director General of SCOP or any person authorized by him. PROJECT PROCEDURE WATER FLUSHING PROJ. 2171 DOC. NO. : IONE-AA00-PE-CM-0018 Rev. A KARBALA REFINERY PROJECT Page 4/21 Ref. FEED DOC. No. : 2342-AA00-JSM-901 Contractor means the person(s) named as contractor in the contract Agreement and the legal successors in title to this person(s). Employer’s Personnel means the Employer’s Representative, the assistants referred to in Sub-Clause 3.2 [Other Employer’s Personnel] and all other staff, labor and other employees of the Employer and of the Employer’s Representative; and any other personnel notified to the Contractor, by the Employer or the Employer’s Representative, as Employer’s Personnel. Contractor’s Personnel means the Contractor’s Representative and all personnel whom the Contractor utilizes on Site, who may include the staff, labor and other employees of the Contractor and of each Subcontractor; and any other personnel assisting the Contractor in the execution of the Works. Subcontractor means any person named in the Contract as a subcontractor, or any person appointed as a subcontractor, for a part of the Works; and the legal successors in title to each of these persons. Commencement Date means the date of notification to the Contractor’s bank of the opening of the activated L/C referred to in clause 14.16.1, unless otherwise defined in the Contract Agreement (date upon which Letter of Credit is opened). “Contract Effective date” means the date of signature of the Contract. Materials means things of all kinds (other than Plant) intended to form or forming part of the Permanent Works, including the supply-only materials (if any) to be supplied by the Contractor under the Contract. Plant means the apparatus, machinery and vehicles intended to form or forming part of the Permanent Works. Temporary Works means all temporary works of every kind (other than Contractor’s Equipment) required on Site for the execution and completion of the Permanent Works and the remedying of any defects. PROJECT PROCEDURE WATER FLUSHING PROJ. 2171 DOC. NO. : IONE-AA00-PE-CM-0018 Rev. A KARBALA REFINERY PROJECT Page 5/21 Ref. FEED DOC. No. : 2342-AA00-JSM-901 Works means the Permanent Works and the Temporary Works, or either of them as appropriate. Contractor’s Documents means the calculations, computer programs and other software, drawings, manuals, models and other documents of a technical nature supplied by the Contractor under the Contract; as described In Sub-Clause 5.2 (Contractor’s Documents). Country means the Republic of Iraq. Site means the places where the Permanent Works are to be executed, including storage and working areas, and to which Plant and Materials are to be delivered, and any other places as may be specified in the Contract as forming part of the Site. Variation means any change to the Employer’s Requirements or the Works, which is instructed or approved as a variation under Clause 13 [Variation and Adjustment]. “Pre-commissioning or PRECOMMISSIONING” means all checks, cleaning and testing of Plant and its implementation without introducing hydrocarbons or permanently energizing or pressure said Plant. Pre-commissioning includes all activities implemented between the completion of construction activities and Ready for Commissioning. “Commissioning or COMMISSIONING” means all activities associated with preparing or testing functionalities of the Plant or part thereof prior to initial START-UP up to the condition of Plant “ready for START-UP”. When the COMMISSIONING activities are completed, the condition of Plant “ready for START-UP” is achieved, a “Plant ready for START-UP” certificate is issued. “START-UP” means introduction of feedstocks into process Plant with the express purpose of producing a product for the first time; this is often referred to as “oil in”. This PROJECT PROCEDURE WATER FLUSHING PROJ. 2171 DOC. NO. : IONE-AA00-PE-CM-0018 Rev. A KARBALA REFINERY PROJECT Page 6/21 Ref. FEED DOC. No. : 2342-AA00-JSM-901 activity will be carried out by the Operation personnel of the CONTRACTOR. “Black Start-up” is the start-up process of plant without relying on the external electric power supply. 3. REFERENCE l Pre-commissioning & Commissioning execution plan_rev.0 (IONE-AA00-PE-CM-001) l Checklist for plant completion pre-commissioning, commissioning and start-up (2342-AA00-JSM-903_0) l Pre-commissioning & Commissioning execution Plan (2342-AA00-JSM-901_0) PROJECT PROCEDURE WATER FLUSHING PROJ. 2171 DOC. NO. : IONE-AA00-PE-CM-0018 Rev. A KARBALA REFINERY PROJECT Page 7/21 Ref. FEED DOC. No. : 2342-AA00-JSM-901 4. WORK FLOW Water flushing will be conducted in accordance with the work flow chart as show as below Picture-1. PLANNING Contractor Company Preparation of Water Flushing Package Issue Preparation of Notification For Information EXECUTION Perform Pre-work Activities Participation & Witness (As requested) Execution of Water Flushing REPORTING Perform post-work Activities Sign to Record Sheet Recording & Sign Register to UNICCS [Picture-1] PROJECT PROCEDURE WATER FLUSHING PROJ. 2171 DOC. NO. : IONE-AA00-PE-CM-0018 Rev. A KARBALA REFINERY PROJECT Page 8/21 Ref. FEED DOC. No. : 2342-AA00-JSM-901 5. HSE The following particular precautions shall be taken for safe Water Flushing operation. a) All unauthorized personnel are excluded from water exit area prior to starting flushing. b) All personnel carrying out the Water Flushing operation shall be fully understood their tasks and ensured by suitable protective equipment: i.e. ear protection, gloves, and goggles as a minimum. c) Hold toolbox meeting in the field involving all concerned personnel to remind again the safety measures and objective of the activities. d) Notify Water Flushing location, route and time of flushing in advance to related disciplines working in associated area. e) The area of the water exit should be roped off and clearly marked with warning notices and kept free of personnel. f) Particles with water exiting the piping could be injured people and damage nearby equipment. Adequate protection has to be installed and every attempt should be made to have the area abandoned prior to Water Flushing. g) Ensure an effective communication system connected between those responsible for the operation and safety personnel. The suitable communication exists between the water supply point operators and dumped out area operator. 6. PLANNING Water Flushing plan shall be properly prepared according to the site condition, such as the availability of facilities on site and the configuration of the pipelines, etc. 6.1 Package Preparation Water Flushing package shall be prepared by including followings a) Water Flushing Package will consist of Marked-up P&ID and Record Sheet. b) Marked-up P&ID will be shown as below. PROJECT PROCEDURE WATER FLUSHING PROJ. 2171 DOC. NO. : IONE-AA00-PE-CM-0018 Rev. A KARBALA REFINERY PROJECT Ref. FEED DOC. No. : 2342-AA00-JSM-901 c) 6.2 l Water Flushing PKG No. l Temporary piping and fittings installation l Location of isolation valve and blinds indicated Water Flushing limits l Location of introduction and downstream water flushing point l Equipment and instrument isolation status Record sheet is mentioned on Attachment #3 Notification of Inspection Notification of Water Flushing will consist of as below 6.3 l Inspection of Water Flushing PKG No. l Unit / System / Sub-system No. l Location l Request date & Time of inspection l Reference document as mentioned in paragraph 6.1 Preparation of Tools, Measuring Devices and Supplies Tools, Measuring Devices and supplies can be required as below l Temporary piping, Spool and spade, if any l Pipe fitting and accessories to be removed l Pipe wrench, valve wrench, cap, plug, elbow, reducer, etc. l Radio or cell phone for communication l Waring tape and sign board l Personal protection equipment l Whistle, Siren Page 9/21 PROJECT PROCEDURE WATER FLUSHING PROJ. 2171 DOC. NO. : IONE-AA00-PE-CM-0018 Rev. A KARBALA REFINERY PROJECT Page 10/21 Ref. FEED DOC. No. : 2342-AA00-JSM-901 7. EXECUTION 7.1 Pre-Work of Water Flushing a) Prior to Water Flushing, ensure that all the remaining works after pressure test have been cleared. b) In principal, the Water Flushing shall be carried out sequentially. i.e. first common header then sub-header and finally branch lines. c) Water shall flow from top to bottom if applicable. d) Water Flushing sequence will be made according to construction progress or geographical or functional criteria and also considering site requirements such as availability of facilities, configuration of the lines or the devices to be removed etc. e) All other lines connected to each unit not ready for Water Flushing shall be isolated until release for ready to flush. Installation and removal of blinds will be controlled by blind list. f) Dead ends shall be cleaned separately. Remove end blind flanges and make hand cleaning for the short dead ends. g) Following Devices included in the flushing system shall be removed as follows. l Control Valve l Check valves (or internal). l Orifice Plates or flowmeter elements l In-line mixers/In-line strainers l Spargers l Spray Nozzles l Thermowells l Venturies l Rotameters l In-line flow totalizers PROJECT PROCEDURE WATER FLUSHING PROJ. 2171 DOC. NO. : IONE-AA00-PE-CM-0018 Rev. A KARBALA REFINERY PROJECT Page 11/21 Ref. FEED DOC. No. : 2342-AA00-JSM-901 h) l Nozzles of ejectors l Traps l Internals of filters and strainers l Control valves except ball/gate type one l Self-activated valves except ball/gate type one l Emergency shut off valves except ball/gate type one Following items shall be isolated l Process impulse lines for instruments shall be isolated by block valve on the impulse pipe itself and whenever possible, shall be disconnected. l Rotating machines such as pumps and compressors by in/out isolation valves or temporary blinds. l Static equipment such as columns, drums which are contained internals are not able to use air holding purpose. However no internals installed vessels, hold-up vessels can be used for downstream lines cleaning after the upstream of the equipment cleaning is completed. l i) Special equipment such as desuperheaters, heating coils, etc. Removal of ball/gate valves is normally not necessary since these valves do not restrict the flush flow path. These valves should be kept in the full open position while flushing. j) Each flushing condition should be checked in advance. Any big remaining works that will hinder the Water Flushing activity shall be coordinated to concerned discipline. k) During Water Flushing operation, large quantity of water with sand, particles of rust, etc. will be spread out near flush-off point. Therefore, equipment and devices shall be protected properly nearby water flush-off point. These foreign materials might damage or contaminate the devices or equipment. l) In case of using permanent pumps, the suction line of the pumps should be cleaned in advance and the suction strainer has to be installed. 7.2 Execution of Water Flushing PROJECT PROCEDURE WATER FLUSHING PROJ. 2171 DOC. NO. : IONE-AA00-PE-CM-0018 Rev. A KARBALA REFINERY PROJECT Page 12/21 Ref. FEED DOC. No. : 2342-AA00-JSM-901 Once all preparation work is completed, pre-commissioning supervisor shall inspect the site and check that all protections are installed properly for water flushing. Generally, Continuous circulation of water and filling and dumping water are applied to flush the piping system in accordance with the site condition such as the availability of water source, pipe configuration and size, flushing schedule etc. 7.2.1 Continuous Flushing This type of flushing normally involves taking a section of piping and flushing is from a “start-point” to an open end. In general, the brief continuous flushing of water is as follows a) The water to be connected from the source with temporary hose, pipe or permanent line. b) The water should be supplied continuously from its own flow or required temporary pump. c) Open the block valve located on water source to make the continuous flow or operating the pump. d) Downstream of water should be routed to disposal point. e) Cooling water lines can be flushed by using permanent pumps. In this case, the pump shall be operated by minimum by-pass line. 7.2.2 Water Filling and Dumping Out Filling and dumping water flushing is often used for cleaning vessels and hook-up piping attached to the vessels. In general, the brief Water Filling and Dumping Out is as follows a) The water to be connected from the source with temporary pipe, hose or permanent line. b) After water is ready, fill the water into vessel. c) During fill the water into the vessels, dumping out point should be closed. d) Dumping out point should be routed to disposal area. PROJECT PROCEDURE WATER FLUSHING PROJ. 2171 DOC. NO. : IONE-AA00-PE-CM-0018 Rev. A KARBALA REFINERY PROJECT Page 13/21 Ref. FEED DOC. No. : 2342-AA00-JSM-901 e) 7.3 Allow the water to enter the system to be cleaned by opening the block valves. Acceptance Criteria The acceptance criteria will be visual inspection of discharged water. When any foreign materials interfering with actual plant operation are no longer visually detected at the water discharging point, the water flushing shall be deemed satisfactory completed. 7.4 Post Work of Water Flushing After the Water Flushing operations of the system, pipe, valves and fragile devices have to be reassembled. a) Fragile devices removed from Water Flushing operation as described in Paragraph 7.1 shall be reinstated. b) Used temporary gasket must be replaced with permanent gaskets. c) Threads is checked carefully and cleaned before reassembled. d) A special attention is required during rotating equipment is reinstated to avoid misalignment. e) The orientation of check valves, globe valves, etc. shall be checked against the direction of flow. f) Specific In-line instruments shall be installed by instrument specialists according to the relevant drawings. g) Temporary blinds installed for Water Flushing shall be removed. h) Temporary valves for Water Flushing are to be replaced by permanent valves and spool. 8. DOCUMENTATION AND REPORTING Work packages including Water Flushing procedures with supporting drawings such as P&ID or sketches, all reports and results will be filled as part of the pre-commissioning dossier. Each Water Flushing operation will be supported by Water Flushing record sheet form as Attachment #3. PROJECT PROCEDURE WATER FLUSHING PROJ. 2171 DOC. NO. : IONE-AA00-PE-CM-0018 Rev. A KARBALA REFINERY PROJECT Ref. FEED DOC. No. : 2342-AA00-JSM-901 9. ATTACHMENT a) Attachment #1 Request For Inspection and Test b) Attachment #2 Water Flushing Check List c) Attachment #3 Cleaning Record Sheet d) Attachment #4 Cleaning Medium for Each Service Page 14/21 PROJECT PROCEDURE WATER FLUSHING PROJ. 2171 DOC. NO. : IONE-AA00-PE-CM-0018 Rev. A KARBALA REFINERY PROJECT Page 15/21 Ref. FEED DOC. No. : 2342-AA00-JSM-901 ATTACHMENT #1 REQUEST FOR INSPECTION & TEST ■ We Would Like to have your presence for inspection / test according to the following schedule. The under noted work is completed ■ This is inform you that the following inspection / test will be carried out at the schedule time mentioned below; Unit No. System No. Sub-system No. Request Date Package No. Location Date & Time 1 2 3 4 5 6 Attachment : Marked-up P&ID Remark CONTRACTOR (COMMISSIONING) EMPLOYER Name Position Signature Date / / / / PROJECT PROCEDURE WATER FLUSHING PROJ. 2171 DOC. NO. : IONE-AA00-PE-CM-0018 Rev. A KARBALA REFINERY PROJECT Page 16/21 Ref. FEED DOC. No. : 2342-AA00-JSM-901 ATTACHMENT #2 WATER FLUSHING CHECK LIST Unit No.: System No.: Sub-system No.: Location: Package No.: No CHECK LIST COMMENTS Pre-Work 1 Pre-commissioning tasks completed YES □ NO □ N/A □ 2 Check detailed marked-up P&ID available YES □ NO □ N/A □ YES □ NO □ N/A □ 3 Coordination with instrument group to remove / isolate fragile instrument devices from network to be cleaned 4 Water supply source is ready? YES □ NO □ N/A □ 5 Support personnel (Pipe fitters, helpers) are available? YES □ NO □ N/A □ 6 Access ladder or scaffolding available YES □ NO □ N/A □ 7 Temporary blind installed (if any) YES □ NO □ N/A □ 8 Hose and temporary pipe connection available YES □ NO □ N/A □ 9 Pressure transmitter or local pressure gauge available YES □ NO □ N/A □ 10 Safety Toolbox meeting completed YES □ NO □ N/A □ 11 Line-up, particularly the flush-off point and ready for pressurization YES □ NO □ N/A □ Post Work 12 Removed pipes/equipment/device reinstated/re-connected YES □ NO □ N/A □ 13 Hose disconnected YES □ NO □ N/A □ 14 Blind removed (if any) YES □ NO □ N/A □ 15 Test Reports signed and filed YES □ NO □ N/A □ Remarks: PROJECT PROCEDURE WATER FLUSHING PROJ. 2171 DOC. NO. : IONE-AA00-PE-CM-0018 Rev. A KARBALA REFINERY PROJECT Page Ref. FEED DOC. No. : 2342-AA00-JSM-901 ATTACHMENT #3 CLEANING RECORD SHEET Unit No.: System No.: Sub-system No.: Package No.: Cleaning Medium □ Air □ Water □ Others ( Cleaning Period (yyyy-mm-dd) : ) ~ Inspection Date (yyyy-mm-dd) : Inspection Result : □ Accepted □ Failed □ Others Comment : CONTRACTOR (COMMISSIONING) EMPLOYER Name Position Signature Date / / / / 17/21 PROJECT PROCEDURE WATER FLUSHING PROJ. 2171 DOC. NO. : IONE-AA00-PE-CM-0018 Rev. A KARBALA REFINERY PROJECT Page 18/21 Ref. FEED DOC. No. : 2342-AA00-JSM-901 ATTACHMENT #4 CLEANING MEDIUM FOR EACH SERVICE No Service Description Cleaning Method 1 AIR Air Air Blowing 2 ASW Sour Water Closed Drain Air Blowing 3 BDD Discharge to Blowdown Air Blowing 4 BFW Boiler Feed Water Air Blowing 5 CAU Caustic Soda Air Blowing 6 CDW Chilled Water Air Blowing 7 CLW Clarified Water Air Blowing 8 CND Clean Condensate Air Blowing 9 CSW Chemical Sewer Air Blowing 10 CWR Cooling Water Return Water Flushing 11 CWS Cooling Water Supply Water Flushing 13 DWA Demineralized Water Air Blowing 14 FWA Fire Water (UG) Air Blowing 15 FWA Fire Water (AG) Air Blowing GAS Gas Air Blowing 17 HPC High Pressure condensate Air Blowing 18 HPN High Pressure Nitrogen Air Blowing 19 HPS High Pressure Steam Steam Blowing 20 HWR Hot Water Return Air Blowing 21 HWS Hot Water Supply Air Blowing 22 HWT Hot Water Air Blowing 23 INA Instrument Air Air Blowing 24 ING Inert Gas Air Blowing 25 LIN Liquid Nitrogen Air Blowing 26 LPC Low Pressure Condensate Air Blowing 27 LPS Low Pressure Steam Steam Blowing 28 MPC Medium Pressure Condensate Air Blowing 29 MPS Medium Pressure Steam Steam Blowing 30 NIT Nitrogen Air Blowing 16 Category UTILITY Remark Except for steam tracing Except for steam tracing Except for steam tracing PROJECT PROCEDURE WATER FLUSHING PROJ. 2171 DOC. NO. : IONE-AA00-PE-CM-0018 Rev. A KARBALA REFINERY PROJECT Ref. FEED DOC. No. : 2342-AA00-JSM-901 31 OWS Oily Water Sewer Air Blowing 32 OXY Oxygen Air Blowing 33 PCD Process condensate Air Blowing 34 PRA Process Air Air Blowing 35 PWA Drinking Water Air Blowing 36 QWA Quench Water Air Blowing 37 RNW Rain Water Air Blowing 38 RWA Raw Water Air Blowing 39 SPC Suspected Condensate Air Blowing 40 SRW Sour Water, Acid Water Air Blowing 41 SSW Sanitary Sewer Air Blowing 42 STW Stripped Sour Water Air Blowing 43 SWA Service Water Air Blowing 44 TWA Treated Water Air Blowing 45 UTA Plant, Service, Utility Air Air Blowing 46 WAT Wash Water Air Blowing 47 WSW White Sewer Air Blowing 48 WWT Waste Water Air Blowing 1 ACID Acid Air Blowing 2 AMN Amine Solution Air Blowing 3 AMS Ammonia Solution Air Blowing 4 AMW Amine Closed Drain Air Blowing 5 ASP Asphalt Air Blowing 6 ASW Sour Water Closed Drain Air Blowing BUT Butane Air Blowing CAH Calcium Hydroxide Air Blowing 9 CLD Closed Drain Header Air Blowing 10 CLG LPG Drain Air Blowing 11 CLO Chlorine Air Blowing 12 CRD Crude Air Blowing 13 DEA Diethanolamine Air Blowing 14 DGO Diesel Oil Air Blowing 7 8 PROCESS Page 19/21 PROJECT PROCEDURE WATER FLUSHING PROJ. 2171 DOC. NO. : IONE-AA00-PE-CM-0018 Rev. A KARBALA REFINERY PROJECT Ref. FEED DOC. No. : 2342-AA00-JSM-901 15 FLA Acid Flare Air Blowing 16 FLD Discharge to LP Flare Air Blowing 17 FLH Discharge HP Flare Air Blowing 18 FLO Flushing Oil Air Blowing 19 FLU Flue Gas Air Blowing 20 FUG Fuel Gas Air Blowing 21 FUH Heavy Fuel Oil Air Blowing 22 FUL Light Fuel Oil Air Blowing 23 FUO Fuel Oil Air Blowing 24 GSL Gasoline Air Blowing 25 HGO Heavy Gas Oil Air Blowing 26 HOR Hot Oil Return Air Blowing 27 HOS Hot Oil Supply Air Blowing 29 HYD Hydrogen Air Blowing 30 HYP Hypochlorite Air Blowing 31 KER Kerosene Air Blowing 32 KOH Potassium Hydroxide Air Blowing 33 LBL Lube Oil Lube Oil Flushing 34 LPG LPG Air Blowing 35 NTG Natural Gas Air Blowing 36 PCB Potassium Carbonate Air Blowing 37 PHA Phosphoric Acid Air Blowing 38 PRO Process Air Blowing 39 PRP Propane Air Blowing 40 QHO Quench Oil Air Blowing 41 REG Regeneration Gas Air Blowing 42 RFD Refrigerant Fluid Air Blowing 43 SLL Seal Oil Air Blowing 44 SOL Solvent Air Blowing 45 VTG Vent Gas Air Blowing ALF Alum. (Flocculants) Air Blowing ATF Antifoaming Air Blowing 1 2 OTHERS Page 20/21 PROJECT PROCEDURE WATER FLUSHING PROJ. 2171 DOC. NO. : IONE-AA00-PE-CM-0018 Rev. A KARBALA REFINERY PROJECT Ref. FEED DOC. No. : 2342-AA00-JSM-901 3 BRN Brine Air Blowing 4 CAT Catalyst Air Blowing 5 CHP Chemical Product Air Blowing 6 FOM Foam Air Blowing 7 GLY Glycol Air Blowing 8 INH Inhibitor Air Blowing 9 SLD Sludge Air Blowing 10 SLP Slop Air Blowing 11 SLY Slurry Air Blowing 12 SOC Sodium Carbonate Air Blowing Page 21/21
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )