HOLD POINT RELEASE
CONSTRUCTION OF TAIBA K-50 PROJECT
CONTRACT NO: KC-130-004
INSPECTION
TESTING
SHOP DRAWINGS
CIVIL / ARCH.
MATERIAL
Quantity Survey
MECHANICAL / HVAC
STR-020
SUBMITTAL NO.
Rev. No. 0
ELECTRICAL / TELECOM
06/07/21
SUBMITTAL DATE
B02
K050-B01-S106+114+118+122
STRUCTURE
Work Area/Location :
Doc/Dwg No.:
Description of activities/Work
Quantity Survey SUBMITTAL
Pay Item
03.03.02
Description
unit
M³
shear wall -
Quantity
Current
Total
248.35
248.35
remarks
shear walls REV.0
CONSULTANT COMMETNS
APPROVAL CODES DESIGNATOR
CODE-1
WORK MAY PROCEED
CODE-2
REVISE AND RESUBMIT , WORK MAY PROCEED
SUBJECTED TO INCORPORATION OF CHANGES
INDICATED
CODE-3
REVISE AND RESUBMIT , WORK MAY NOT PROCEED
CODE-4
REVIEW NOT REQUIRED
PROJECT MANAGER
TECHNICAL MANAGER
CONSULTANT
Eng. Mohammad Shamaly
Eng. Ibrahim Shafay
Signature
Signature:
Signature: