WEEKLY REPORT III
JUNE 20-25, 2022
ESP Construction Services
Agustin, Hanah S.
Camus, Johanna Mae M.
Valdez, Lorraine Mae B.
(June 20, 2022/Monday)
Activities
Signing and Passing of
Memorandum of
Agreement (MOA)
(June 21, 2022/Tuesday)
Activities
Reviewing of Proposed TwoStorey Residential Master Plan
for Estimation
Estimating the required number
of Cement Bags and Volume of
Sand and Gravel for Column,
Column & Wall Footing, Beam,
and Concrete Stairs
Remarks
One window is missing from the
Schedule of Windows
Number of the required windows from the
schedule is different from the floor plan.
Remarks
Missing Step
Detail and Design
of Stairs
Remarks
We used the table for concrete proportion to determine the number of cement
bags, and the volume of sand and gravel.
(June 22, 2022/Wednesday)
Activities
Estimating the required
CHB, volume of sand
and bags of cement for
mortar and plaster
Remarks
The are 12.5 pieces of concrete hollow blocks
(CHB) in every square meter of a wall.
A piece of standard concrete hollow block (CHB) has a surface area of (0.02mx0.04m) = 0.08 m². In
accordance to this, a one square meter area will require 12.5 pcs of CHB.
1m² / 0.08 m² = 12.5 pcs of CHB
Remarks
Thickness of plaster (academe):
Exterior wall= 20-25mm
Interior wall= 8-16mm
However, in actual, the thickness of plaster does not necessarily differ and
25mm is typically used.
A table for the quantity of cement and sand for CHB mortar per square meter was
used for estimation.
Remarks
(June 23, 2022/Thursday)
Activities
Estimating the required
reinforcements for the
layered CHB, columns,
foundations, and
beams.
Remarks
(June 24, 2022/Friday)
Activities
Estimated the required volume of
sand, bags of cement, and
reinforcements for floor slab.
Acquired the total estimated
volume of sand and gravel,
number of cement bags, and
reinforcement of the proposed
two storey residential building.
Remarks
TOTAL HOURS RENDERED
46/240 hrs
46 hrs
240 hrs
THANK YOU !
- ESP Construction Services Interns