BDx CGK3 Brown &een Field, Jakarta Technica BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection July 2024 Prepared by: PT MEINHARDT INDONESIA BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Copyright © PT. Meinhardt Indonesia This document is subject to copyright. Use or copying of this document in whole or part without the written permission of PT. Meinhardt Indonesia constitutes an infringement of copyright. Disclaimer Information in this document is current as of the date of this report. While reasonable skill and care has been taken in preparing the document, PT. Meinhardt Indonesia accepts no liability for loss or damages incurred as a result of reliance placed upon its content. The mention of any company, product or process in this report does not constitute or imply endorsement by PT. Meinhardt Indonesia. Prepared by Purpose Documents Rev. 00 Approved by Disc. Name Spec Verified by PL&FF JK Sign Date Name 30.06.24 IEB Sign Date Name 30.06.24 SD Sign Date 30.06.24 \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page i BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection TABLE OF CONTENT 1.0 PROJECT DETAILS ..................................................................................................... 1 2.0 CODES AND STANDARDS ......................................................................................... 1 2.1 2.2 3.0 SUMMARY .................................................................................................................... 3 3.1 4.0 GENERAL ................................................................................................................. 3 3.1.1 SCOPE OF PLUMBING, SANITARY, FIRE SUPPRESSION SYSTEM AND FIRE PROTECTION WORK.............................................................................. 3 3.1.2 ELECTRICAL SYSTEM INTERFACES WORK ............................................. 7 3.1.3 PLUMBING AND SANITARY CONTRACTOR INTERFACES WORK .......... 8 3.1.4 ALL CONTRACTORS GENERAL RESPONSIBILITIES ............................... 9 3.1.5 CONTRACTORS RESPONSIBILITIES ....................................................... 12 QUALITY REQUIREMENTS ...................................................................................... 13 4.1 4.2 4.3 4.4 5.0 PLUMBING ............................................................................................................... 1 FIRE PROTECTION ................................................................................................. 2 DEFINITIONS ......................................................................................................... 13 QUALITY ASSURANCE ......................................................................................... 13 QUALITY CONTROL .............................................................................................. 14 EXECUTION ........................................................................................................... 16 4.4.1 TESTING AND INSPECTION LOG ............................................................. 16 4.4.2 REPAIR AND PROTECTION ...................................................................... 16 CONTRACT EXECUTION REQUIREMENTS ............................................................ 18 5.1 SITE MEASURES................................................................................................... 18 5.2 EXAMINATION ....................................................................................................... 19 5.3 PREPARATION ...................................................................................................... 19 5.4 SETTING OUT ........................................................................................................ 20 5.5 INSTALLATION ...................................................................................................... 20 5.6 PLUMBING, SANITARY, FIRE SUPPRESSION SYSTEM AND FIRE SERVICES COMMISSIONING REQUIREMENTS .......................................................... 22 5.6.1 GENERAL .................................................................................................... 22 5.6.2 RELATED DOCUMENTS ............................................................................ 22 5.6.3 SUMMARY ................................................................................................... 22 5.6.4 DEFINITIONS .............................................................................................. 22 5.6.5 CONTRACTOR / CONTRACTOR RESPONSIBILITIES ............................. 23 5.6.6 COMMISSIONING DOCUMENTATION ...................................................... 25 5.6.7 SUBMITTALS .............................................................................................. 27 5.7 EXECUTION ........................................................................................................... 28 5.7.1 TESTING PREPARATION .......................................................................... 28 5.7.2 TESTING REQUIREMENT .......................................................................... 29 6.0 DEMONSTRATION AND TRAINING ......................................................................... 33 6.1 General ................................................................................................................... 33 6.1.1 SUMMARY ................................................................................................... 33 6.1.2 SUBMITTALS .............................................................................................. 33 6.1.3 QUALITY ASSURANCE .............................................................................. 34 6.1.4 COORDINATION ......................................................................................... 34 6.2 PRODUCTS ............................................................................................................ 34 6.2.1 INSTRUCTION PROGRAM ......................................................................... 34 \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page ii BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 6.3 EXECUTION ........................................................................................................... 35 6.3.1 PREPARATION ........................................................................................... 35 6.3.2 INSTRUCTION ............................................................................................ 35 7.0 PIPEWORK, VALVES AND FITTINGS – PLUMBING, SANITARY, FIRE SUPPRESSION SYSTEM AND FIRE PROTECTION SERVICES.................................................... 36 7.1 7.2 GENERAL ............................................................................................................... 36 OPERATING AND TEST PRESSURES ................................................................ 37 7.2.1 WATER SYSTEM ........................................................................................ 37 7.2.2 TESTING OF FUEL OIL AND HIGH TEMPERATURE OIL SYSTEMS ...... 38 7.2.3 TESTING OF OPEN VENTS AND DRAINS ................................................ 38 7.3 PIPE MATERIALS .................................................................................................. 38 7.4 PIPEWORK TYPES................................................................................................ 39 7.5 PIPE JOINTS .......................................................................................................... 40 7.5.1 WELDING OF PIPE WORK ......................................................................... 41 7.5.2 FLANGED JOINT......................................................................................... 42 7.5.3 PIPE FITTING .............................................................................................. 43 7.5.4 PIPE SUPPORT .......................................................................................... 43 7.5.5 PIPE ANCHORS, THRUST BLOCKS AND EXPANSION........................... 45 7.5.6 AUTOMATIC AIR VENTS ............................................................................ 46 7.5.7 GUIDES ....................................................................................................... 46 7.5.8 PIPE SLEEVES ........................................................................................... 46 7.5.9 INSTALLATION STANDARD ...................................................................... 46 7.5.10 PIPE PRESSURE TESTING ..................................................................... 47 7.5.11 VALVES ..................................................................................................... 48 7.5.12 ISOLATING (GATE) VALVE ...................................................................... 49 7.5.13 CHECK VALVES ....................................................................................... 49 7.5.14 PRESSURE RELIEF VALVES .................................................................. 50 7.5.15 PRESSURE REDUCING VALVE (PRV) and PRESSURE RESTRICTING VALVE (PRAV) ............................................................................... 50 7.5.16 Water Hammer Eliminator ......................................................................... 52 7.5.17 Water Hammer Arrester ............................................................................. 52 7.5.18 BUTTERFLY VALVES ............................................................................... 52 7.5.19 GLOBE VALVES ....................................................................................... 53 7.5.20 BALL / FLOAT VALVES ............................................................................ 53 7.5.21 AUTOMATIC AIR RELIEF VALVES .......................................................... 53 7.5.22 SOLENOID VALVES/MOTORIZED VALVES ........................................... 54 7.5.23 STRAINERS .............................................................................................. 54 7.5.24 PRESSURE SWITCHES ........................................................................... 54 7.5.26 DOUBLE REGULATING VALVES............................................................. 55 7.5.27 PIPE ANTI VIBRATION CONNECTORS .................................................. 56 7.5.28 EXPANSION JOINTS ................................................................................ 56 7.5.29 GASKETS .................................................................................................. 57 7.5.30 FLOW SWITCHES .................................................................................... 57 7.5.31 WATER LEVEL CONTROLLERS.............................................................. 57 7.5.32 THERMOMETERS .................................................................................... 57 7.5.33 UNDERGROUND PIPE PROTECTION .................................................... 58 7.5.34 CAST IRON PIPE. ..................................................................................... 58 8.0 PIPEWORK INSULATION ......................................................................................... 61 8.1 GENERAL ............................................................................................................... 61 8.1.1 METHOD OF ATTACHMENT / JOINT ........................................................ 61 8.1.2 METAL SHEATING...................................................................................... 62 8.1.3 VAPOUR BARRIER ..................................................................................... 62 8.1.4 INSULATION MATERIALS .......................................................................... 63 8.1.5 SCHEDULE OF INSULATION FOR PIPED SERVICES ............................. 63 \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page iii BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 9.0 SANITARY SYSTEM - PLUMBING SERVICES ........................................................ 64 9.1 9.2 GENERAL ............................................................................................................... 64 SANITARY DRAINAGE INSTALLATION ............................................................... 64 9.2.1 PIPE SUPPORTS ........................................................................................ 64 9.2.2 VENT PIPES AND STACKS ........................................................................ 64 9.2.3 TERMINATION OF DISCHARGE AND VENT STACK ............................... 65 9.2.4 CLEANING EYES AND INSPECTION OPENINGS .................................... 65 9.2.5 TRAPS ......................................................................................................... 65 9.2.6 PIPE GRADIENTS ....................................................................................... 65 9.3 WATER PUMPS ..................................................................................................... 66 9.3.1 GENERAL .................................................................................................... 66 9.3.2 AUTOMATIC PRESSURE BOOSTER PUMP SETS .................................. 67 9.3.3 SUMP PUMPS/SANITARY PUMPS/STORAGE WATER PUMPS/ MOVEABLE SUMP PUMPS .................................................................................... 67 9.3.4 VERTICAL MULTI-STAGE PUMPS ............................................................ 69 9.3.5 HORIZONTAL MULTI-STAGE PUMPS....................................................... 69 9.3.6 CONTROL OF DUTY / STANDBY PUMPS ................................................ 69 9.4 WATER STORAGE TANKS ................................................................................... 70 9.4.1 GENERAL .................................................................................................... 70 9.4.2 DESCRIPTION ............................................................................................ 70 9.4.3 WATER LEVEL CONTROL SWITCHES ..................................................... 70 9.5 WATER TREATMENT PLANT INSTALLATION .................................................... 71 9.5.1 GENERAL .................................................................................................... 71 9.5.2 SYSTEM COMPONENTS ........................................................................... 72 9.6 WATER SUPPLY.................................................................................................... 72 9.6.1 WATER SOURCE........................................................................................ 72 9.6.2 QUALITY OF WATER INCOMING WATER SUPPLY................................. 72 9.7 TREATED WATER ................................................................................................. 72 9.7.1 TREATED WATER PRODUCTION CAPACITIES ...................................... 72 9.7.2 TREATED WATER QUALITY ...................................................................... 72 9.7.3 WATER TESTING ....................................................................................... 73 9.7.4 DELIVERY POINT OF TREATED WATER ................................................. 74 9.8 MISCELLANEOUS SYSTEMS ............................................................................... 74 9.8.1 CHEMICAL DOSING SYSTEM ................................................................... 74 9.9 TESTING OF WTP ................................................................................................. 74 9.9.1 GENERAL .................................................................................................... 74 9.9.2 TEST AND DISINFECTION BEFORE TAKING OVER ............................... 74 9.9.3 OPERATION TEST...................................................................................... 75 9.9.4 HANDING OVER ......................................................................................... 75 9.9.5 ADDITIONAL INFORMATION TO BE INCLUDED WITH TENDER ........... 75 9.10 SEWAGE TREATMENT PLANT .......................................................................... 75 9.10.1 DESIGN PARAMETERS ........................................................................... 75 9.10.2 INFLUENT (RAW SEWAGE)..................................................................... 76 9.10.3 EFFLUENT QUALITY (TREATED SEWAGE) ........................................... 76 9.10.4 FREQUENCY OF EFFLUENT TESTING .................................................. 77 9.10.5 LABORATORY EQUIPMENT .................................................................... 77 9.10.6 FUNCTIONAL PLANT DESIGN ................................................................ 78 9.10.7 TYPICAL REQUIREMENTS ...................................................................... 78 9.11 WATERMETER .................................................................................................... 78 10.0 AUTOMATIC CONTROL SYSTEMS ......................................................................... 81 10.1 CONTROL SYSTEM REQUIREMENTS .............................................................. 81 10.1.1 GENERAL REQUIREMENTS.................................................................... 81 10.2 SCOPE OF WORK ............................................................................................... 82 10.3 CONTROL SYSTEM OPERATION ...................................................................... 84 10.3.1 GENERAL .................................................................................................. 84 \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page iv BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 10.4 PLUMBING & SANITARY SERVICES ................................................................. 84 10.4.1 OPERATION OF SEWAGE TREATMENT PLANT ................................... 84 10.4.2 OPERATION OF WASTE/STORM WATER SUMP LIFTING SYSTEMS . 84 10.4.3 WASTE/STORM WATER SUMP PUMPS ................................................. 85 10.4.4 OPERATION OF CLEAN WATER TREATMENT SYSTEM ..................... 85 10.4.5 OPERATION OF CLEAN WATER TREATMENT PUMPS ....................... 85 10.4.6 OPERATION OF TOP LEVEL CLEAN WATER BOOSTER SYSTEM ..... 86 10.4.7 WATER BOOSTER PUMPS ..................................................................... 86 10.5 FIRE PROTECTION SERVICES .......................................................................... 87 11.0 FIRE SERVICES EQUIPMENT .................................................................................. 88 11.1 FIRE SERVICES PIPEWORK .............................................................................. 88 11.1.1 GENERAL .................................................................................................. 88 11.1.2 FIRE BRIGADE BREECHING INLET (SIAMESE CONNECTION) ........... 88 11.1.3 FLOW SWITCHES .................................................................................... 88 11.2 FIRE PUMPS ........................................................................................................ 89 11.2.2 GENERAL REQUIREMENTS.................................................................... 89 11.2.3 HORIZONTAL SPLIT CASE PUMPS ........................................................ 90 11.2.4 VERTICAL MULTI-STAGE PUMPS (JOCKEY PUMP) ............................. 90 11.2.6 OPERATION .............................................................................................. 91 11.3 HYDRANT INSTALLATION .................................................................................. 92 11.3.1 GENERAL .................................................................................................. 92 11.3.2 PIPEWORK................................................................................................ 92 11.3.3 HYDRANT PILLARS .................................................................................. 92 11.3.4 INDOOR HYDRANT BOXES..................................................................... 92 11.4 AUTOMATIC SPRINKLER SYSTEM ................................................................... 92 11.4.1 GENERAL .................................................................................................. 92 11.4.2 HAZARD CLASSIFICATION OF OCCUPANCIES .................................... 92 11.4.3 SPRINKLER PIPEWORK .......................................................................... 93 11.4.4 SPRINKLER HEADS ................................................................................. 93 11.4.5 SPRINKLER ALARM SIGNAL ................................................................... 94 11.4.6 MAIN ALARM CONTROL VALVES SETS ................................................ 94 11.5 PORTABLE FIRE EXTINGUISHERS ................................................................... 95 11.5.1 GENERAL .................................................................................................. 95 11.5.2 INSTALLATION ......................................................................................... 95 11.6 AUTOMATIC SPRINKLER SYSTEM (PREACTION) ........................................... 95 11.6.1 Flow Control ............................................................................................... 96 11.6.2 Fire cycle Control Panel ............................................................................. 96 11.6.3 Valve Trim Box........................................................................................... 97 11.6.4 Fire cycle Detectors ................................................................................... 97 11.6.5 Battery Chargers and Batteries ................................................................. 97 11.6.6 Smoke Detectors ....................................................................................... 97 11.6.7 Heat Detectors ........................................................................................... 98 11.7 FIRE SUPPRESSION SYSTEM with DETECTION / RELEASE SYSTEM.......... 98 11.7.1 FIRE SUPPRESSION WITH NOVEC SYSTEM........................................ 98 11.7.2 GAS FIRE SUPPRESSION SYSTEM ....................................................... 99 11.7.3 SYSTEM DESCRIPTION ........................................................................ 100 11.7.4 JOB DESCRIPTION FOR INSTALLATION OF GAS .............................. 101 11.7.5 TECHNICAL SPECIFICATIONS OF MATERIALS AND EQUIPMENT... 102 11.7.6 INSTALLATION SPECIFICATIONS ........................................................ 104 11.7.7 SUMMARY OF SPECIFICATION STANDARDS .................................... 108 11.8 ASPIRATING SMOKE DETECTORS (ASD) ...................................................... 108 11.9 LI-ION TAMER .................................................................................................... 110 12.0 TESTING AND DOCUMENTATIONS ...................................................................... 113 \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page v BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 13.0 ELECTRICAL WORKS IN ASSOCIATION WITH PLUMBING, SANITARY, FIRE SUPPRESSION SYSTEM AND FIRE PROTECTION SERVICES.................................................. 116 13.1 13.2 13.3 13.4 GENERAL ........................................................................................................... 116 SUBMISSION ..................................................................................................... 116 REGULATIONS AND STATUTORY REQUIREMENTS .................................... 117 SWITCHBOARDS AND SWITCHBOARDS EQUIPMENT................................. 117 13.4.1 FLOOR STANDING MOTOR CONTROL PANELS ................................ 118 13.4.2 WALL MOUNTED PANEL ....................................................................... 119 13.4.3 BUSBARS ................................................................................................ 120 13.4.4 AIR CIRCUIT BREAKERS ....................................................................... 120 13.4.5 MOULDED CASE CIRCUIT BREAKERS (MCCB’S) .............................. 121 13.4.6 MINIATURE CIRCUIT BREAKER ........................................................... 121 13.4.7 FUSED SWITCHGEAR AND ISOLATORS ............................................. 122 13.4.8 FUSES ..................................................................................................... 122 13.4.9 CONTACTORS ........................................................................................ 122 13.4.10 MEASURING INSTRUMENTS AND PROTECTION RELAYS ............. 123 13.4.11 LABELLING ........................................................................................... 124 13.4.12 TIME SWITCHES .................................................................................. 124 13.4.13 TIME DELAYS ....................................................................................... 124 13.4.14 HOUR RUN METER .............................................................................. 124 13.4.15 CONTROL SWITCHES ......................................................................... 124 13.4.16 INDICATING LAMPS ............................................................................. 125 13.4.17 PUSH BUTTON SWITCHES ................................................................. 125 13.4.18 PUSH BUTTON SWITCHES ................................................................. 125 13.4.19 CABLING ............................................................................................... 125 13.4.20 TERMINAL BLOCKS ............................................................................. 126 13.4.21 WIRING DIAGRAM ................................................................................ 126 13.4.22 LABELLING ........................................................................................... 126 13.4.23 INTERFACING CONNECTION ............................................................. 127 13.4.24 GENERAL REQUIREMENTS................................................................ 127 13.5 MCB DISTRIBUTION BOARDS ......................................................................... 127 13.6 CABLING ............................................................................................................ 128 13.6.1 PVC INSULATED ARMOURED COPPER CABLE ................................. 128 13.6.2 PVC INSULATED COPPER CABLES ..................................................... 129 13.6.3 FIRE RESISTANT CABLES (FRC) ......................................................... 129 13.6.4 FIRE RETARTDANT CABLE (FRCC) (N/A) ............................................ 129 13.6.5 CABLING FIRE ALARM .......................................................................... 129 13.7 WIRING .............................................................................................................. 130 13.8 CONDUIT ........................................................................................................... 131 13.8.1 CONDUIT BOXES ................................................................................... 132 13.9 CABLE TRUNKING ............................................................................................ 133 13.10 CABLE TRAYS ................................................................................................. 133 13.11 MOTORS .......................................................................................................... 134 13.11.1 GENERAL .............................................................................................. 134 13.11.2 MOTOR INSTALLATION ....................................................................... 136 13.11.3 MOTOR STARTERS ............................................................................. 136 13.12 TYPES OF STARTER ...................................................................................... 137 13.12.1 DOL STARTER ...................................................................................... 137 13.12.2 CLOSED TRANSITION “STAR-DELTA” STARTERS (CT.SD) ............. 137 13.12.3 AUTO-TRANSFORMER STARTERS (CT.AT)...................................... 138 13.13 ELECTRONIC CONTROL SOFTSTARTER .................................................... 138 13.14 VARIABLE FREQUENCY DRIVE / VSD .......................................................... 141 13.14.1 GENERAL .............................................................................................. 141 13.14.2 PERFORMANCE ................................................................................... 141 13.14.3 COMPONENTS AND FUNCTIONS ...................................................... 142 13.14.4 SAFETY PROTECTION DEVICES ....................................................... 143 \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page vi BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 13.14.5 SPEED CONTROL SIGNALS AND STATUS INDICATIONS ............... 143 13.14.6 ENGINEERING BACK-UP AND WARRANTIES ................................... 144 13.14.7 RADIO INTERFERENCE ...................................................................... 144 13.14.8 HARMONIC DISTORTION .................................................................... 144 13.15 EARTHING ....................................................................................................... 145 13.16 SURGE PROTECTION DEVICES ................................................................... 145 13.17 INSTALLATION PROFESSTIONAL ENGINEER AND LEW SUPERVISION.. 145 13.18 SITE AND COMMISSIONING .......................................................................... 146 13.19 REJECTION OF SWITCHBOARD ................................................................... 146 13.19.1 ELECTRICAL EARTHING OF RISING MAINS ..................................... 146 14.0 PAINTING AND IDENTIFICATION .......................................................................... 147 14.1 14.2 GENERAL ........................................................................................................... 147 PAINTING ........................................................................................................... 147 14.2.1 MATERIALS............................................................................................. 147 14.2.2 PLANT, MACHINERY AND EQUIPMENT .............................................. 148 14.2.3 EXPOSED METALWORK ....................................................................... 148 14.2.4 CONCEALED METALWORK .................................................................. 148 14.2.5 DUCTWORK AND PIPEWORK............................................................... 148 14.3 IDENTIFICATION AND LABELLING .................................................................. 149 14.3.1 EQUIPMENT IDENTIFICATION .............................................................. 149 14.3.2 PIPEWORK IDENTIFICATION ................................................................ 149 15.0 NOISE AND VIBRATION ......................................................................................... 150 15.1 VIBRATION CONTROL ...................................................................................... 150 15.1.1 GENERAL ................................................................................................ 150 15.1.2 SPRING ISOLATORS ............................................................................. 151 15.1.3 NEOPRENE ‘IN-SHEAR’ ISOLATORS ................................................... 152 15.1.4 VIBRATION ISOLATION PADS .............................................................. 152 15.1.5 DOUBLE DEFLECTION PADS ............................................................... 152 15.1.6 PIPE HANGERS AND SUPPORTS ........................................................ 153 15.1.7 PIPEWORK GENERAL ........................................................................... 153 15.1.8 FLEXIBLE CONNECTIORS/EXPANSION JOINTS ................................ 153 15.1.9 INERTIA BASES ...................................................................................... 154 15.1.10 EQUIPMENTS MOUNTING .................................................................. 154 15.1.11 OTHER ASSOCIATED EQUIPMENT AND NON-VIBRATION EQUIPMENT .......................................................................................................... 155 15.1.12 EXECUTION .......................................................................................... 155 15.2 ACOUSTIC REQUIREMENTS ........................................................................... 156 15.2.1 GENERAL ................................................................................................ 156 15.2.2 NOISE AND VIBRATION COMPLIANCE TEST ..................................... 157 16.0 SEISMIC SUPPORT SYSTEMS FOR MEP SERVICES .......................................... 161 17.0 TESTING, COMMISSIONING AND HANDOVER .................................................... 162 17.1 17.2 GENERAL ........................................................................................................... 162 TESTING ............................................................................................................ 162 17.2.1 VALVES, COCKS AND FITTINGS .......................................................... 162 17.2.2 PIPEWORK LOAD TEST ........................................................................ 163 17.3 ON-SITE TESTING AND COMMISSIONING ..................................................... 163 17.4 PLUMBING, SANITARY, FIRE SUPPRESSION SYSTEM AND FIRE SYSTEM SITE TESTING ............................................................................................... 166 17.5 FINAL ADJUSTMENT AND COMMISSIONING ................................................ 168 17.6 HAND OVER ...................................................................................................... 168 17.7 FACTORY TEST ................................................................................................ 169 17.8 PUMPS ............................................................................................................... 169 \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page vii BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 17.9 ELECTRIC MOTORS ......................................................................................... 169 17.10 STARTERS AND CONTROL GEAR ................................................................ 169 17.11 FACTORY HYDROSTATIC OR PRESSURE TESTS...................................... 169 17.12 STATUTORY AUTHORITIES TEST AND INSPECTION................................. 169 17.13 PRELIMINARY COMMISSIONING CHECKS .................................................. 170 17.14 COMMISSIONING ............................................................................................ 170 17.15 FINAL ACCEPTANCE TESTS ......................................................................... 170 17.16 REJECTION OF PLANT ................................................................................... 171 17.17 WARRANTY AND HANDOVER ....................................................................... 171 17.18 SPARE PARTS................................................................................................. 171 17.19 TRAINING ......................................................................................................... 172 17.20 MAINTENANCE PERIOD ................................................................................. 172 17.21 COMPREHENSIVE MAINTENANCE DURING MAINTENANCE PERIOD ..... 173 17.22 OPERATION AND MAINTENANCE INSTRUCTIONS MANUAL .................... 174 17.23 ADJUSTMENTS DURING MAINTENANCE PERIOD ...................................... 176 18.0 REFERENCE MANUFACTURERS .......................................................................... 177 \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page viii BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 1.0 PROJECT DETAILS A. Project Identification : CGK3 – TBS2 B. Project Location : Jalan T.B. Simatupang Kav. 10, RT 16/06, Kebayoran Lama, Cilandak Barat, South Jakarta 12430 C. Employer : PT. Starone Mitra Telekomunikasi D. Architect : PT. Meinhardt Indonesia E. MEP Design Engineer : PT. Meinhardt Indonesia F. Structural Engineers : PT. Meinhardt Indonesia 2.0 CODES AND STANDARDS 2.1 PLUMBING • • • • • • • • • • • • • • • • • • • • • • • • • • • • International Building Code (IBC). International Plumbing Code (IPC). International Fire Code (IFC). International Electrical Code (IEC). Pergub DKI Nomor 122 Tahun 2005 - Domestic wastewater management in Jakarta province SNI 03 – 6481 – 2000 - Plumbing systems SNI 03 – 7065 – 2005 - Codes of design for plumbing systems SNI 8153-2015 - Plumbing Systems in Buildings Perancangan dan Pemeliharaan Sistem Plambing, Soufyan M. Noerbambang dan Takeo Morimura (Peter) Edisi ke Tiga, Penerbit PT. PRATNYA PARAMITA. Permen LH no.5 2014 Tentang Baku Mutu Air Limbah. International Energy Code (IECC) - Energy Efficiency Standards. Current Local Government Amendments and Regulations. ANSI – American National Standards Institute. ASHRAE – American Society of Heating, Refrigerating, and Air Conditioning Engineers. ASME – American Society of Mechanical Engineers. ASSE – American Society of Sanitary Engineering. ASTM – American Society for Testing and Materials. AWS – American Welding Society. AWWA – American Water Work Association. CISPI – Cast Iron Soil Pipe Institute. EPA – Environmental Protection Agency. NEMA – National Electrical Manufacturer’s Association. NFPA – National Fire Protection Association. NSF – National Sanitation Foundation. UL – Underwriters’ Laboratories. Green Building Code USGBC – United States Green Building Council’s LEED Guidelines. Owner program requirements (OPR) \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 1 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 2.2 FIRE PROTECTION • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • International Building Code (IBC). Current International Building Code (CBC) Latest International Mechanical Code (IMC) Latest International Plumbing Code (IPC). Latest International Fire Code (IFC) Latest National Electrical Code (NEC). Perda DKI Nomor 8 Tahun 2008 - Local Regulation of DKI Jakarta: Fire protection and prevention SNI 03-1736-2000 - Procedures for Planning a Protection System for Prevention of Fire Hazards in Houses and Buildings SNI 03 – 1745 – 2000 - Methods for design and installation of standpipe and hose systems for fire protection of buildings SNI 03 – 3989 – 2000 - Methods for design and installation of automatic sprinkler systems for fire protection of buildings Regulation Menteri Pekerjaan Umum 26/PRT/M/2008 Regarding Technical Requirements for Fire Protection Systems in Buildings and the Environment SNI 03-6570-2001 Regarding Fixed Pump Installations for Fire Protection SNI 03-3987-1995 Guide to Installing Light Fire Extinguishers to Prevent Fire Dangers in Homes and Buildings. SNI 8799-1-2023 Data Center Technical Specifications. Latest Local Government Amendments and Regulations. ANSI – American National Standards Institute. ASHRAE – American Society of Heating, Refrigerating, and Air Conditioning Engineers. ASME – American Society of Mechanical Engineers. ASTM – American Society for Testing and Materials. AWS – American Welding Society. AWWA – American Water Work Association. EPA – Environmental Protection Agency. NFPA – National Fire Protection Association. NFPA 13 – Installation of Sprinkler Systems. NFPA 14 – Installation of Standpipe and Hose Systems. NFPA 75 - Standard for Protection of Information Technology Equipment NFPA 76 - Standard for the Protection of Telecommunications Facilities NFPA 10 – Portable Fire Extinguishers NFPA 2001 – Standard of Clean Agent Fire Extinguisher System NSF – National Sanitation Foundation. SMACNA – Sheet Metal and Air Conditioning Contractors’ National Association. Guidelines for Seismic Restraints of Mechanical Systems. UL – Underwriters’ Laboratories. FM – Factory Mutual USGBC – United States Green Building Council’s LEED Guidelines. Owner Program Requirements (OPR). \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 2 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 3.0 SUMMARY 3.1 GENERAL a. The Plumbing, Sanitary, Fire Suppression System and Fire Protection installation work shall form part of Main Contract Direct work. b. All Plumbing, Sanitary, Fire Suppression System and Fire Protection installation Contract involves the design, supply, installation, testing and commissioning and maintenance of the Plumbing, Sanitary, Fire Suppression System and Fire Protection installation as detail and described in the Main Contract/Contract document. c. The Entire Plumbing, Sanitary, Fire Suppression System and Fire Protection Installation shall comply with all relevant and applicable codes and regulations in Indonesia. The requirements of all Authorities having jurisdiction on the Contract Works shall also be complied with. d. This brief shall be read in conjunction with the material specifications. 3.1.1 SCOPE OF PLUMBING, SANITARY, FIRE SUPPRESSION SYSTEM AND FIRE PROTECTION WORK Preliminary Requirements Contractor shall: a. Submit drawings and details of materials and equipment for approval prior to construction / installation. b. The Contractor shall prepare complete shop / coordination / construction / fabrication drawings to describe the proposed works. These drawings shall be at the scales specified and submitted for approval prior to ordering of equipment or commencement of any installation work. Reproductions or copies of the design drawings will not be accepted. c. The Contractor shall provide complete samples and/or catalogue technical data for all proposed equipment/ materials for approval prior to ordering or fabricating of equipment/ materials or commencement of any installation work. d. All equipment performance data and information contained in the Contractors drawings and equipment submission shall be strictly in accordance with the SI system of units. Submissions containing non SI units shall be rejected. e. Contractor submissions, drawings, operating and maintenance manuals etc. shall be in English Language. f. Submit work method statements for approval. g. Submit method & sequence of work for approval. h. Submit work checklist for approval. i. Submit inspection checklist for approval. j. Submit monitoring checklist for approval. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 3 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection k. Submit pretesting, testing & commissioning checklist for approval. l. Submit pretesting, testing & commissioning report in stages. Contractor shall allow for all adjustments as required from the design/tender drawings to suit the actual site conditions. These adjustments shall be as deemed necessary by the Engineer / Consultant o deemed necessary for good practice and all cost should be included in the tender offer. This specification, unless specifically stated otherwise, calls for the provision of systems complete in every respect, fit and ready for continuous, safe, efficient operation. The Contractor shall therefore supply, deliver, install, test, commission and set to work the systems and they shall be complete with all necessary ancillary and minor items, whether expressly indicated on drawings or specification or not. Plumbing, Sanitary, Fire Suppression System and Fire Protection Services The extent of works under this contract shall comprise the design, supply, installation, testing, commissioning, setting to work and handing over in working order, and provision of “as-built” drawings and Operating and Maintenance manuals. Supply and installation of: a. Raw/Utility water distribution systems complete with water storage, pumps, filters, pipe work and all other auxiliary systems as specified and shown on drawings. b. Clean water distribution systems complete with water storage, pumps, treatment, pipe work and all other auxiliary systems as specified and shown on drawings. c. The landscape areas will be served with a manual irrigation (standpipes) system to suit landscape requirements. pipe work and all other auxiliary systems as specified and shown on drawings. d. Waste, Soil drainage and kitchen drainage distribution systems complete with, pumps, grease traps, venting, pipe work and all other auxiliary systems as specified and shown on drawings. e. Sewage Treatment plant complete with all other auxiliary systems as specified and shown on drawings. f. Provide plumbing, wastewater, vent pipe, rainwater and gas systems in accordance with the drawings and specification. g. Sanitary ejector system complete with pumps, pipe work etc. and all other auxiliary systems as specified and shown on drawings. h. Fire protection system, including fire pump set (complete with diesel, electric and jockey pumps, panels), fuel storage, external hydrant pillars with outdoor hydrant boxes, fire brigade 4 way breeching inlet (Siamese booster connections), internal hydrant boxes (with alarm bell, telephone jack, manual call point, alarm indicator, floor mimic panel and fire hose), associated electrical work, control systems and piping distribution system complete with all necessary control valves, valves and fittings as specified and shown on the drawings. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 4 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection i. Fire Extinguishers complete with mounting brackets and stainless steel boxes as shown on drawings. j. Fire suppression system complete with piping, valve, hazard lamp, suppression nozzle, suppression tubes, cabling, detectors, controls panels or as shown on the drawings and standard fire suppression requirement and regulations. k. Installation of all sanitary wares and fittings as specified and shown on drawings (by project architects). l. All interfacing work with the Building Management System and Energy Management System for remote/control, monitoring include water metering etc. and associated accessories as specified and shown on drawing. m. All other Plumbing, Sanitary, Fire Suppression System and Fire fighting systems described on drawings and detailed in specifications. n. All every set pump for control panel The Contractor shall provide and install two control panels each pump (duty and stand by) And the two panels connect to each other to call the pump (duty and stand by). Special Requirement: i. Testing and Commissioning (T&C) of ‘Shell and Core’ of the buildings and Independent Testing and Commissioning Agent: The Contractor shall be aware that certain testing and commissioning of the Plumbing, Sanitary, Fire Suppression System and Fire Protection systems prior to the hand-over of ‘Shell and Core’ apartment to the tenants. The Subcontractor shall include in his works such pre-handover testing and commissioning works. The Contractor shall also include all necessary subsequent testing and commissioning works required to verify the specified performance of the system after the tenancy fitting-out works are completed. The required testing and commissioning at different stages shall be agreed with the Project Manager or Engineer and the Tenant’s representative. The Contractor shall also be aware and agreeable that an independent Testing and Commissioning agent may be engaged to witness and certify all these testing and commissioning works. ii. Equipment Factory Witness Test: The Contractor shall arrange factory witness test for Consultant and Client (for 3 persons) to verify performances of Fire Pumps as specified in the tender document and drawing. iii. All equipment selection must be high efficiency performance type such as pumps, etc. iv. Anticorrosion Treatment: Anticorrosion treatment for external pumps to be provided 5 times greater resistance against acid rain and salt corrosion. v. To provide water leakage detection system as specified and shown on the drawings. vi. Mock up Area: a) The Main Contract document stipulates requirement of mock-up area/areas for unit apartments. The Contractor shall fully complete all the work within the mockup areas prior for Client / Architect / Consultant quality inspection. vii. Contractor shall comply with all the Acoustic Performance Requirement as mentioned in the Particular Specification. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 5 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection viii. In addition to any requirement for sprinkler points provisions noted elsewhere and type, the contractor shall allow for the supply and installation of 500 additional sprinkler points (every types as required) complete with pipework and supports. ix. A Computerized Maintenance Management System (CMMS) will be provided by the ACMV Contractor. The Plumbing, Sanitary, Fire Suppression System and Fire Protection Contractor shall liaise and coordinate with the ACMV Contractor and provide all information and documentation for the Plumbing, Sanitary, Fire Suppression System and Fire Protection Contractor’s equipment to allow the creation of the CMMS data bases and planned preventative maintenance (PPM) inputs and work order/work task outputs and any other information and documentation required for the correct implementation of the CMMS. x. The Plumbing, Sanitary, Fire Suppression System and Fire Protection Contractor shall include in their contract for any upgrading of cable trays, cable ladders, trunking or conduit due to their wiring works. Plumbing, Sanitary, Fire Suppression System and Fire Protection Systems Interfaces Work With Others Trade SCOPE TO BE INCLUDED: 1). The Protection system shall be interfaced with the Fire Alarm system as per the following requirement: a. Fire pumps, sprinkler control valves, monitored flow switches, all monitored sprinkler/hydrant isolating valves and fire protection water storage shall be interfaced with fire alarm system. 2). All associated works for on/Off remote control and status indication panel in FCC room including switches and indication lights for the following equipment and system: a) Fire pumps status. b) Monitored flow switches status. c) Monitor valve status. d) Fire protection water, water tanks storage level alarm. e) Suppression system 3). The Contractor shall provide all necessary provisions for interfacing with other trades, services, and equipment not under this contract. All necessary sensors, current/voltage transformers, voltage-free contact, relays, auxiliary contacts, terminals, transducers, etc. for interfacing with other works shall be provided by the Contractor. 4). All control/monitoring wiring from sensors, equipment, and components for the interfacing shall be terminated at a separate interfacing compartment located at the respective equipment/system’s switchboard or control panel provided under the Contract. The interfacing compartment shall be completed with all necessary connectors, terminals, and with proper identifications to allow interfacing works to be easily carried out. The compartment shall clearly indicate “Extra Low Voltage Cable Only. No Power Cable Connection”. Where there are no equipment/system switchboard/control panels, the interfacing panels shall be co-ordinated with the Main Contractor and other contractors. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 6 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 3.1.2 5). For every control panel and each module of the switchboard, at least five (5) spare terminals shall be provided for future interfacing works. 6). Wiring and cables for interfacing with the Fire Alarm System and other fire protection and life safety systems shall be fire rated to comply with Fire Authority’s requirements 7). All the interface provisions shall be DC operated and rated not more than 50 mA. 8). The Contractor shall provide and make all power cable connections from their equipment, local control panels, and switchboards to the electrical isolators or power points (including cable termination) provided by the Electrical contractor. Location of power supply isolators and power points shall be co-ordinated and agreed between the contractor and the Electrical contractor. 9). In addition to the interfacing requirements shown on the Drawings, interfacing provisions as described below shall also be made by each respective contractor. ELECTRICAL SYSTEM INTERFACES WORK 1) General The Electrical Contractor shall provide power supply for the respective mechanical installation. The power supply interfacing is terminated at designed locations in general on floor-by-floor basis. The location and capacity are as shown on the Drawing and schematic diagrams. The Electrical contractor will terminate the power supply at an Interfacing Point (IP) through an isolator or cable termination box or switched fused connection unit at the designated IP locations. The respective mechanical installation contractor shall be responsible for power connections to these IP and any further cable distribution from the IP to their motor control centre (MCCs), motor control panels (LMCPs), and field sensors/devices. Further cable distribution by the respective mechanical installation contractor shall include distribution board, distribution board, etc. as required to complete the power supply installation from the designated IP to each of the mechanical equipment. 2) Interfacing point The Electrical Contractor will terminate the power supply at IP locations through isolators or cable termination boxes or switched fused connection unit. The locations of the IP indicated on the Drawing shall be coordinated amongst the main contractor and the mechanical and electrical contractor and approval by the Architect. The IP isolators or cable termination boxes or switched fused connection unit shall be provided by the electrical contractor. 3) Provision of Interfacing Point The respective mechanical installation contractor shall study the power supply interfacing schedule on the IP provisions. The respective mechanical installation contractor shall ensure their equipment offered requires power supply within the IP capacity. 4) Electrical Distribution from Interfacing Point a. All mechanical installation contractors shall be responsible for the power distribution from the IP to each of the mechanical equipment and field sensors/devices. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 7 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 3.1.3 b. The grouping of the power distribution to the mechanical equipment shall consider the system operation requirement to ensure any power failure to one IP shall not interrupt the operation of their mechanical equipment feed from different IP. c. The respective mechanical installation contractor shall engage a Qualify Electrical Worker of appropriate grade to design the electrical power distribution to the mechanical equipment. The mechanical installation contractor’s Quality Electrical Worker shall test and commission the installation and certify the installation to the requirements prior to power turn-on of the IP. d. The respective mechanical installation Contractor shall be responsible for providing complete earthling system for the entire mechanical equipment and installation which can comply fully the requirement. The main circuit protective conductors (CPCs) will be provided by the Electrical Contractor at the IP. The respective mechanical installation Contractor shall be responsible for the continuity of the earthing installation from the IP to the mechanical equipment earthling and bonding requirement. e. The Electrical Contractor shall provide the following for other trades : i) Isolators and power points (fused spur units) for equipment and systems of other contractors as shown on the Drawings. The other contractors shall be responsible for connection and extending the power supply to their equipment and control panels. Where shown on the Drawings, the Electrical contractor shall make direct power cable connections to the mechanical system’s main motor control centres. ii) Earthing terminal in the Fire Command Centre and all other plant rooms for supplementary equip potential bonding of other equipment and systems. iii) Electrical bonding of all roof equipment and external metal cladding including provisions and connection of bonding cables. iv) Fuel main storage tank and day tank High/Low level alarm signals to the Building Management/Automation System. v) Power point in each toilet for the plumbing trade (for connection to automatic sanitary sensors and flush valve by the plumbing and Sanitary contractor). PLUMBING AND SANITARY CONTRACTOR INTERFACES WORK The plumbing and sanitary contractor shall provide the following for other trades: a) Water supply connections to water tanks under other contracts including isolation valve. b) Drainage facilities for pressure relief/parity valves and condensate drain from airhanding units and fan coil units. Insulation of drainage pipe receiving condensate drain shall also be provided by the plumbing and sanitary contractor. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 8 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection c) 3.1.4 Gas leakage signals to the Fire Alarm System, Building Management/Automation System, High/Low level alarm signals to the Building Management/Automation System for all water tanks. ALL CONTRACTORS GENERAL RESPONSIBILITIES a). The Contractor shall liaise with the Main Contractor and all other tradesmen to ensure that works of all trades are properly coordinated. b). The Contractor shall be responsible to the timely submissions of equipment/material proposal, detailed design, shop drawings, and other technical proposals to comply with the Main Contractor’s programme. Sufficient time shall be allowed for the review by Architect/Engineers/PM/CM, revision/amendments required, ordering and delivery of equipment/material, and installation period. (No claims for extension of time of additional costs shall be entertained as a result of the Contractor’s failure to make his submissions in time which may result in the delay of the completion of project.) c). The contractor shall provide all necessary technical information, details and layout of his installation to Main Contractor and shall co-operate and co-ordinate with the Main Contractor and other contractors or the smooth execution of the works on site. d). Re-routing and re-organization of services as result of space coordination to provide sufficient installation and maintenance access to facilitate easy future operation and maintenance. Cost for any modification or reroute of services due to coordination is included in the tender offer. e). Re-route and re-organization of services to achieve the clear headroom / ceiling height to accommodate the architectural design. f). Adjustment and enhancements to suit the construction works on site. g). Adjustment and modification of design to suit the specified phased completion and early hand-over areas. h). Changes required as result of certain construction sequence and methods. i). All necessary trench excavations and back filling for installation of the buried pipe work, inspection chambers, cables etc. j). All necessary pipe sleeves and cast in element. k). To coordinate and supervise Contractor penetration box up installation as required by respective Contractor. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 9 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection l). To mark, coordinate and supervise Contractor for making opening provision for MEP fittings such as lighting, speaker, switches etc. on ceiling or partition wall as required by respective Contractor. m). Fire stop for all penetrations through fire rated walls, floors and ceilings. n). Fire rated enclosure or box up services running along or across protected lobbies, corridors etc. by respective Contractor. o). Chasing of brick walls for pipes, conduits and fitting. (Make good of brick wall will be done by Contractor.) p). Painting and labelling services example pipe work / ductwork / etc. and equipment where exposed in plant rooms / car park and where exposed to view external / internal / perforated ceiling / etc. q). All associated building work unless specifically nominated elsewhere including making good. r). Provide all necessary ladders, scissors lift, gantries and scaffolding etc. to enable installation, testing and commissioning of the systems. s). Testing and commissioning of all systems. t). The Contractor shall coordinate with the Contractor for early turn on of permanent supply of electricity and water services for testing. In the event that the permanent supply of electricity and water services is not available in time, temporary power and water MUST be provided by Contractor at no additional cost to the Owner. u). Liaison with all Local Authorities to obtain all necessary certificates and approvals, including the completion of all submission drawings, forms and payment of any fees and charges. All the costs for all testing required by Local Authorities shall be included in the offer. v). Provision of spare parts required in the first eighteen (18) months operation after practical completion. w). In addition to the spare part specified elsewhere in the Sub Contractor documents, the following spare parts shall be provided and handed over to owner at the completion of the Maintenance Period of Defect Liability Period. (Item listed in the specification). x). Eighteen (18) month’s full time (24hrs) operational comprehensive maintenance and breakdown services from date of hand over. This will include chilled water and condenser water sampling and laboratory testing during the above maintenance period. y). All other works and systems as specified in the Contract document and or shown the drawings. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 10 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection z). Interfacing with adjacent Contractor – The Sub Contractor shall provide detailed coordination and interfacing with all adjacent contractors as stipulated in Contract. The Contractor shall make due allowance for all interfacing works including detailed coordination and interfacing in his tender and shall be deemed included in the Contract. No claims of any kind arising from this clause shall be entertained by the Owner. aa). The contractor shall make adequate provisions of flexible joint/connectors and/or expansion loops where services pass through structural expansion joints. The locations of these expansion joints are shown on the architectural/structural drawings. The provisions of flexible joints/connections shall take into account the movement allowance. Detailed calculations shall be submitted by the Contractor to justify the selection of these joints/connectors. bb). For settlement joints shown on the structural drawings or required by the Main Contractor for the construction of structural works, the Contractor shall co-ordinate with the Main Contractor such that any installation which passes through settlement joints shall be executed after the respective settlement joints are cast and the expected structural differential settlement has significantly taken place. cc). The Contractor shall co-ordinate with the Main Contractor to ensure that all services installed under metal roof and skylight shall have adequate provisions to take into account the movement and deflection of the roof structure and the cladding. dd). Where the materials or equipment offered comply with other standards, the Contractor shall demonstrate that they meet the requirements of the Specification and details shall be submitted to the Consultant/PM for approval. Project Manager has the right to reject this submission without any question by Contractor. ee). All equipment supplied shall comply with the specified duty / rating in the Specification and Drawings. ff). The capacities of all plant and equipment described in the Contract are minimum capacities and the Contractor shall take into account any variations which may be necessary due to his own detailed design and actual installation requirements. gg). The Contractors shall supply and install the following safety equipment and notices for each switchboard / control panel in the respective switch rooms and plant rooms: 1). Solid rubber insulated mats complying with BS 921 in front of and extending the full length of the control panel / switchboards. 2). Copies of all statutory safety notices, regulations and instructions for resuscitation and treatment after electric shock. 3). Danger signs on the switchboards / control panels, the doors of plant room, switch rooms and electrical riser duct rooms and elsewhere to the requirement of the Power Supply Authorities. 4). A copy of the main single line diagram, varnished and mounted on suitable hard backing and frame (in glass panel), showing clearly the full details of the electrical and mechanical systems as supplied and installed. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 11 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 3.1.5 CONTRACTORS RESPONSIBILITIES a). Contractor to produce co-ordination drawing and to co-ordinate all trades as to ensure no clashes on site. b). Responsible for all abortive cost due to poor co-ordination works with other trades. c). To ensure all trade follows sequence of work during construction. d). Indicating and coordination for providing access panels in the ceilings as required for access to piping, valves, electrical fittings, local control panel and cables. (Contract shall provide drawing, marking and supervised the work). e). Casting in of all pipe sleeves, puddle flanges, equipment holding down bolts, power and control cable conduits etc., where required to be built in at construction. (Material will be provided by Subcontractor. Drawing detail and supervision work will be by Contractor.) Floor and wall opening / box up structural provision. (Contractor to mark on form work and supervise Main-Contractor work.) f). g). Bulkheads, where required. h). Roof penetrations and up stand flashing, the builder/Contractor to provide the under flashing, Contractor to provide the over flashing, where required. i). To cut and make good all ceiling and dry wall partition for Contractor fitting installation. (Contract shall provide drawing, mark and supervised the work). j). To provide reference line as requested by all Contractor or consultant for inspection and MEP services installation. k). To provide scaffolding (height more than 4m) / lifting facilities for Contractor installation works, area such as atrium, main lift lobbies, high ceiling areas etc. l). To provide MEP equipment, pipes, valves etc. m). Make good all finishes such as wall, ceiling etc. upon completion of MEP conceal element installation. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 12 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 4.0 QUALITY REQUIREMENTS 4.1 DEFINITIONS 4.2 A. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution of the Work to guard against defects and deficiencies and substantiate that proposed construction will comply with requirements. B. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that actual products incorporated into the Work and completed construction comply with requirements. Services do not include contract enforcement activities performed by Engineer or Construction Manager. QUALITY ASSURANCE A. Key personnel required include: 1. Installer 2. Manufacturer 3. Fabricator 4. Testing Agency 5. Authorized service representative 6. Contractor / Contractor QA/QC Team 7. Contractor Specialist QA/QC Team B. The Contractor, prior to the commencement of the works, shall submit for Consultant / Project Manager / Construction Manager approval comprehensive QA/QC programme for the Contract works which shall include, but not be limited to the following: 1). QA/QC programme of the manufacturing process of equipment. 2). Method statement of all site erection/installation works. 3). Method of protection for material/equipment during delivery, and stored on and off the site; and 4). Testing and commissioning programmes, procedures, etc. C. All equipment, material and items incorporated in the Works under this contract are to be and of top-class quality. D. Equipment/material of non-reputable make may not be accepted solely at the discretion of the Architect. E. The use of electrically dissimilar metals in contact with each other shall be avoided. If this is not possible, the contract surfaces of the two (2) metals shall be insulated from each other by an approved method. F. All work under this contract shall be performed in a skilful and workmanlike manner and in accordance with best workshop practise. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 13 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 4.3 G. All components shall be easily accessible for maintenance/replacement. H. All instrumentation and equipment for inspection, testing and commissioning shall be calibrated and maintained by the contractor. The contractor shall submit all valid calibration records from manufacturer and/or recognised laboratories and testing authorities before the use of such instrumentation and equipment. QUALITY CONTROL A. Contractor/Contractor Responsibilities: Quality-control services specified and required by authorities having jurisdiction and to meet the design intent. B. The contractor shall establish and maintain quality and workmanship in his works to ensure compliance with the specification and drawings. C. PM/CM reserve the right to inspect and reject any part of the works not complying. The contractor shall replace such rejected works without cost variation and delay to contract. D. No work shall be covered up or put out of view without the agreement of CM team. The contractor shall provide/allow PM/CM full opportunity for the examination and measurement of any work which is about to be covered or put out of view. Upon request by PM/CM team, the contractor shall expose their Works and allow/provide access to PM/CM to inspect any part of the Works during the course of the manufacturing or site installation/erection. E. Manufacturer's Field Services: Where indicated, engage a factory-authorized service representative to inspect field-assembled components and equipment installation, including service connections. Report results in writing as specified in Division 1 Section "Submittal Procedures." F. Retesting / Re-inspecting: Regardless of whether original tests or inspections were Contractor's responsibility, provide quality-control services, including retesting and reinspecting, for construction that replaced Work that failed to comply with the Contract Documents. G. Retesting / Re-inspection should not be more than 2 times. Contractor / Contractor QA/QC team to conduct internal testing before requesting for any inspection or witnessing for any testing. H. QA/QC Team to endorse and sign for every of inspection form before requesting for Construction Manager Team for inspection. I. Associated Services: Access to the Work, taking and storing samples. J. Special Tests and Inspections: The Owner has the right to request the Contractor or engage a special inspector to conduct special tests and inspections if the Owner has doubt with any of the Manufacturer or suppliers product deliver to site. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 14 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection K. Contractor / Contractor QA/QC team to submit proposal for pre-fabrication material & method such as valves station for AHU, ductwork etc. as to have better quality. L. Equipment & Material delivered to site: Contractor to request for inspection before installation work. Owner representatives have the right to reject or request to dismantle any equipment or material not being inspected before installation work without any question and all cost will be borne by Contractor and no extension of Contract time. M. All equipment, materials and installation method shall comply with the General/Particular Specification and the current standards and regulations as described in the Contract Specification. N. Where the materials or equipment offered comply with other standards, the Contractor shall demonstrate that they meet the requirements of the Specification and details shall be submitted to the Consultant/PM/CM for approval. O. Equipment & Material installed on site: Contractor to protect all equipment and material which have been installed to owner representation satisfaction. P. All welded joint, open end ductwork/pipes to be protected after daily work as to avoid rust occur or collection of dust. Owner representatives have the right to reject or request to dismantle and replace without any question and all cost will be borne by Contractor and no extension of contract time. Q. Support & bracket installation for equipment & material: Contractor to submit calculation and drawing for approval from Engineers prior to installation work. Contractor to engage Qualified Person to do the calculation. R. Full Mock-ups & samples: Required for 1 floor typical offices/apartment units, each form of construction and finish required, using materials indicated for the completed work. Mock-ups establish the standard by which the Work will be judged. S. Full Mock-ups & samples: Required for 1 typical AHU room, each form of construction and finish required, using materials indicated for the completed work. Mock-ups establish the standard by which the Work will be judged. T. Full Mock-ups & samples: Required for 1 typical Electrical riser each form of construction and finish required, using materials indicated for the completed work. Mock-ups establish the standard by which the Work will be judged. U. Full Mock-ups & samples: Required for 1 typical sprinkler / plumbing riser, each form of construction and finish required, using materials indicated for the completed work. Mock-ups establish the standard by which the Work will be judged. V. Full Mock-ups & samples: Required for 1 typical lift lobby, each form of construction and finish required, using materials indicated for the completed work. Mock-ups establish the standard by which the Work will be judged. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 15 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection W. Full Mock-ups & samples: Required for 1 typical Male and Female toilet, other public toilets, apartment toilets, each form of construction and finish required, using materials indicated for the completed work. Mock-ups establish the standard by which the Work will be judged. X. Welding: Submit samples of welding from each person who is proposed to do the welding to the Construction Manager. Welding is to be carried out only by personnel who have been approved by the Engineer and Construction Manager. 4.4 EXECUTION 4.4.1 TESTING AND INSPECTION LOG A. 4.4.2 Prepare a record of testing and inspections. Include the following: 1. Date testing or inspection was conducted. 2. Description of the Work for testing or inspection. 3. Attach with part print drawing and highlight services to be testing & inspection. 4. Date test or inspection results were transmitted to Engineer / Construction Manager Team. 5. Identification of testing agency or special inspector conducting test or inspection. 6. Valid calibration certificate for the testing equipment to be enclosed with testing inspection form. B. Maintain log at Project site. Post changes and modifications as they occur. Provide access to testing and inspection log for Construction Manager's reference at any time as requested. C. Prepare summary log / list / report for all testing and inspection from beginning of project till completion and to be handed over to Consultant submission. Hard Copy & Soft Copy. REPAIR AND PROTECTION A. General: On completion of testing, inspection, sample taking, and similar services, repair damaged construction and restore substrates and finishes. 1. Provide materials and comply with installation requirements specified in the Specification. B. Protect construction exposed by or for quality-control service activities. C. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality-control services. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 16 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection D. Protection shall include covers, crating, sheds, stores or other means to protect the apparatus, equipment and materials from weather, water damage, and corrosion and to prevent dirt, grit, plaster or other foreign substances from entering the working parts of machinery or equipment. Special care shall be taken to keep all opening of pipes, ducts, and etc. closed while in storage or during the course of delivery and erection /installation. E. Any items suffering damage in transit or on site shall be rejected and replaced without cost and time to the Contract. F. In the case of equipment and materials which originate from other countries and/or different climate conditions, all such equipment and material shall be adequately and securely packed for safe transportation with due regard to the climate conditions encountered in transit and arrival. G. The Contractor shall take precautions to avoid unnecessary damage to the works of other trades. H. Contractor to address all corrective action issued by owner representative and to submit preventive action. I. Contractor to reply to Construction Manager Representative/Engineers within 3 days upon receiving any form of corrective action issued and advised Construction Manager/Engineers the time duration needed for the rectification work or replacement. J. Contractor to remove immediately any damaged of rejected equipment or material off site. K. Contractor shall expeditiously replace, make good and completely rectify at their cost any works which are considered defective or unsatisfactory by Consultant/ Project Manager/Construction Manager. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 17 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 5.0 CONTRACT EXECUTION REQUIREMENTS This Section includes general procedural requirements governing execution of the Work. 5.1 SITE MEASURES GENERAL The Contractor shall execute the Contractor’s Works in a manner so as not to interfere with the use of the roads and footpaths and occupation of nearby buildings. OBSTRUCTION TO ROAD The Contractor is not allowed to obstruct/disrupt the traffic flow. The Contractor shall plan his works so that there will be no parking/queuing of delivery trucks, concrete mixers, etc. along the roads. NOISE CONTROL The works must be carried out with minimum of noise and no nuisance in any form shall be tolerated. The Project Manager shall have the absolute discretion to give stop work instruction, if required. The Contractor shall make all necessary arrangement in his programme of the works and provisions for all eventualities in the computation of his Tender Offer for strict and unreserved compliance with this requirement. The Contractor shall not be entitles to any cost and time extension for compliance with stop work instruction issued by the Project Manager pursuant to this clause. EXISTING WORKS AND SERVICES The Contractor shall take all necessary precautions not to disturb or damage existing plants, planting beds, concrete kerbs and drains, pavements, tracks, footpaths, wires, cables, pipes, equipment, etc. Any damage to such items during the progress of works shall be made good as soon as possible to the satisfaction of the Project Manager or third parties related at the Contractor’s expense. The Contractor shall fully responsible if any fine or penalty issue or imposed by any authorities pursuant to this clause. DISCHARGING OF WATER TO PUBLIC DRAINAGE The Contractor/Contractor shall take all necessary precautions not to discharge any dirty water to the public drainage for the construction work. The water should be treated before discharging and to be monitor as to prevent flooring to the public area or road. Submission to authorities for temporary water discharge will be done by Contractor/contractor. The Contractor/Contractor shall fully responsible if any fine or penalty issue or imposed by any authorities pursuant to this clause. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 18 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 5.2 EXAMINATION A. Existing Utilities: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning site work, investigate and verify the existence and location of underground utilities and other construction affecting the Work. 1. B. Acceptance of Conditions: Examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. 1. Written Report: Site survey & Record observations. 2. Underground detection such as cables etc. to be conducted before commencement of excavation or underground services installation work. Report to be submitted to Construction Manager for record. 3. Verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers. 4. Examine roughing-in for mechanical and electrical systems to verify actual locations of connections before equipment and fixture installation. 5. Examine walls, floors, and roofs for suitable conditions where products and systems are to be installed. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions. 6. 5.3 Before construction, verify the location and invert elevation at points of connection of sanitary sewer, public drain and water-service piping; and underground electrical services. PREPARATION A. Field Measurements: Take field measurements as required to fit the Work properly. Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the Work. B. Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on Drawings. C. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to Engineer. Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 19 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 5.4 SETTING OUT The Contractor shall liaise with the Contractor for proper setting out of the Contract Works. The Contractor shall be aware of the following: a). The position of equipment etc. indicated on the Drawings, are given for tendering purposes only. Exact positions shall be determined by the Contractor after co-ordination with the Contractor. The contractor shall make any modifications that may be necessary without any cost variation to contract. b). The Contractor shall set out position and levels for the Works (based on the setting out reference line and levels given by the Contractor) and shall refer the same to the Contractor for his approval before erection / installation. c). Contractor must provide marking and levelling for every lift door jamb and lift door frame at every lift lobby prior for lift installation. 5.5 INSTALLATION A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated. 1. Make vertical work plumb and make horizontal work level. 2. Where space is limited, install components to maximize space available for maintenance and ease of removal for replacement. 3. To conceal all pipes, ducts, and wiring in finished areas, unless otherwise indicated. 4. Maintain minimum headroom clearance of 2.3 m(or as client required) below services in plant rooms and spaces without a suspended ceiling. (Contractor to highlight to Project Manager/Construction Manager if any non-compliance). 5. Maintain minimum headroom clearance of 2.3 m(or as client required) below services in all basement car park drive way and minimum headroom clearance of 2.3m below services in overall basement car park area. (Contractor to highlight to Project Manager/Construction Manager if any non-compliance). 6. Maintain minimum headroom clearance of 2.3 m(or as client required) below services in basement 2 loading and unloading area & driveway. (Contractor to highlight to Project Manager/Construction Manager if any non-compliance). B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated. C. Installation work can only proceed upon approval of installation method statement and sequence of work method statement by Construction Manager / Consultant. Construction Manager has the right to stop any work due to non-compliance of \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 20 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection sequence of work as it may effect of quality of work or safety issue. No extension of time due to non-compliance. D. Install products at the time and under conditions that will ensure the best possible results. Maintain conditions required for product performance until Substantial Completion. E. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy. F. Tools and Equipment: Do not use tools or equipment that produces harmful noise levels. G. Templates: Obtain and distribute to the parties involved templates for work specified to be factory prepared and field installed. Check Shop Drawings of other work to confirm that adequate provisions are made for locating and installing products to comply with indicated requirements. H. Anchors and Fasteners: Provide anchors and fasteners as required to anchor each component securely in place, accurately located and aligned with other portions of the Work. 1. Mounting Heights: Where mounting heights are not indicated, mount components at heights directed by Engineer/Construction Manager. 2. Allow for building movement, including thermal expansion and contraction. 3. Coordinate installation of anchorages and brackets. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation. I. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints. J. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous. K. For equipment and services intended to be installed at outdoor locations or exposed to external weather conditions, the Contractor shall ensure that these equipment and services are properly protected by weatherproof external casing or cladding. All associated motors, terminal and electrical components shall be weatherproof type and suitable for outdoor installation, IP 55 or greater. Weather protection shield shall also be provided for all moving parts of the equipment and associated accessories external to the weatherproof equipment casing. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 21 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection L. M. This requirement shall also apply to services installed in close proximity of external opening and louvers. For all motor panels outside plant rooms and exposed location such as car parks, services area, public space etc. shall be provided with a lockable front door with viewing glass panel. (Lock set must be common lock set system for individual services). N. Contractor MUST coordinate and implement common support for MEP services installation such as cable support system, pipe support system etc. to minimize individual bracket for services. O. All brackets and support detail MUST be endorsed by Contractor Qualify Engineer with calculation and to be submitted for Consultant/Engineer approval 5.6 PLUMBING, SANITARY, FIRE SUPPRESSION SYSTEM AND FIRE SERVICES COMMISSIONING REQUIREMENTS 5.6.1 GENERAL 5.6.2 RELATED DOCUMENTS 5.6.3 5.6.4 A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section. B. OPR, BoD, and BoD- Plumbing and Fire Fighting documentation prepared by Owner and Engineer contains requirements that apply to this Section. SUMMARY A. This Section includes requirements for commissioning the Plumbing Sanitary and Fire system and its subsystems and equipment. This Section supplements the general requirements specified in Division 1 Section "General Commissioning Requirements." B. Related Sections include the following: 1. Division 1 Section "General Commissioning Requirements" for requirements for commissioning processes that apply to this Section. general DEFINITIONS A. B. C. D. E. Engineer: Consultant/Design professionals responsible for design of Plumbing, Sanitary, Fire Suppression System and Fire, fire alarms, electrical, communications, controls for ACMV systems, and other related systems. BoD : Basis of Design OPR: Owner's Project Requirements. Systems, Subsystems, and Equipment: Where these terms are used together or separately, they shall mean "as-built" systems, subsystems, and equipment. TAB: Testing, Adjusting, and Balancing. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 22 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 5.6.5 CONTRACTOR / CONTRACTOR RESPONSIBILITIES A. The following responsibilities are in addition to those specified in Division 1 Section "General Commissioning Requirements." B. The Contractor/Contractor shall: 1. Attend procedures meeting for TAB Work. 2. Attend TAB verification testing. 3. Provide measuring instruments and logging devices to record test data, and data acquisition equipment to record data for the complete range of testing for the required test period. 4. Review control designs with the Engineer, for compliance with the OPR and BoD, for controllability with respect to actual equipment to be installed, and recommend adjustments to control designs and sequence of operation descriptions. 5. Contract Documents Review: With the Engineer, review the Contract Documents before developing TAB procedures. a. Verify the following: 1). Accessibility of equipment and components required for TAB Work. 2). Adequate number and placement of test ports and test instrumentation to allow reading and compilation of system and equipment performance data needed to conduct both TAB and commissioning testing. 3). Water flow rates have been specified and compared to central equipment output capacities. b. Identify discontinuities and omissions in the Contract Documents. 6. Electrical Contractor / contractor : a. Coordinate installations and connections between and Electrical/Fire Alarm system, Plumbing, Sanitary, Fire Suppression System and Fire and ACMV systems, sub systems, and equipment. 7. The Contractor shall coordinate with the Contractor for the early turn on of permanent supply of electrical and water services for the testing. In the event that the permanent supply of electrical and water services are not available in time, temporary power and water MUST be provided at no additional cost to the Owner. 8. Utility cost for water and electrical supply (temporary or permanent) used during the testing and commissioning of the system by Contractors shall be borne by the Contractor. 9. All pipe work which are to be encased or conceal shall be tested and witness by Construction Manager Representative before they are enclosed. 10. Before the commencement of any testing witnessing by Construction Manager Representative, the Contractor QA/QC team shall have all the works inspected \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 23 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection including internal preliminary testing and adjustment of equipment to its proper running order. 11. The testing period shall form part of the Contract period and no extension of time will be granted by reasons of any extension of the testing period to permit rectification, modification, adjustment or retesting of the installation. 12. The Contractor shall also be required to conduct all type of testing as and when requested by the Owner or the Authorities during the Defect Liability without any extra cost. 13. Integrated Services Testing: After Owner representation accepts the testing and commissioning result for each system, the Contractor shall coordinate with Contractor and other Contractors for related works e.g. Electrical works, Fire Alarm works, ACMV works, ELV works, etc. and carry out integrated systems test. (All utility charges for the integrated services testing of mechanical and electrical system shall be borne by the Contractor.) 14. The integrated testing also will be conducted monthly during defect liability period. (All cost for remobilising manpower, testing equipment, tools, etc. should be included in the tender offer.) 15. The integrated tests shall simulate the following situation: A) Electrical Main failure. B) Fire Emergency. C) All other tests and procedures as required by authorised. 16. Interfacing for Building Management System and Fire Alarm system is part of the provision herein to be made by the Contractor and shall be in addition to any provision for localised control and monitoring devices and system specified elsewhere in the Specification. The intention is to achieve comprehensive control and monitoring of all mechanical and electrical system by integrating all localised control and monitoring system with the BMS and Fire Alarm systems. Towards the end, the Contractor shall coordinate with BMS and Fire Alarm specialise contractor (which engaged by Contractor) in such matters as the installation of auxiliary devices, wiring identification and testing, uniformity in control circuitry and the provision of all necessary data for programming. 17. The Contractor shall be responsible for all works and materials necessary for the provisions auxiliary devices as specified herein, including the provisions of terminals block or interfacing boxes at each starter panel, switch-board section and elsewhere as specified, the installation of sensors, and wiring from such auxiliary devices and sensor to the terminal blocks. 18. The contractor shall provide a separate section or compartment in each starter panel of switchboard to house the terminal blocks mentioned in the above paragraph. A minimum of 25% spare terminal block shall be allowed for additional interfacing requirement. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 24 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 19. The Contractor shall ensure that all BMS control and monitoring devices and Fire Alarm interfaces install by them are correctly terminated in the terminal blocks. (BMS Specialist contractor to cross check with Contractor for confirmation) 20. The Contractor shall be responsible for and shall connect all temporary connections across the terminal blocks mentioned above and elsewhere if these connections are necessary for testing, commissioning and temporary operation of any of the equipment installed by them. The Contractor shall liaise with the BMS specialist to phase in the functions of the BMS progressively. 5.6.6 COMMISSIONING DOCUMENTATION A. The following are in addition to documentation specified in Division 1 Section "General Commissioning Requirements." B. Testing Checklists: The Contractor, with assistance of the Engineer, shall develop test checklists for Plumbing, Sanitary, Fire Suppression System and Fire systems, systems, and equipment, including integrated, interfaces and interlocks with other systems. The Contractor shall prepare separate checklists for each mode of operation and provide space on the list to indicate whether the mode under test responded as required. In addition to the requirements specified in Division 1 Section "General Commissioning Requirements," checklists shall include, but not be limited to, the following: 1. Calibration of sensors and sensor function. 2. Testing conditions under which test was conducted, including (as applicable) ambient conditions, set points, override conditions, and status and operating conditions that impact the results of test. 3. Control sequences for Plumbing, Sanitary, Fire Suppression System and Fire systems. 4. System sequences for Plumbing, Sanitary, Fire Suppression System and Fire systems. 5. Strength of control signal for each set point at specified conditions. 6. Responses to control signals at specified conditions. 7. Sequence of response(s) to control signals at specified conditions. 8. Electrical demand or power input at specified conditions. 9. Expected performance of systems, systems, and equipment at each step of test. 10. Narrative description of observed performance of systems, subsystems, and equipment. Notation to indicate whether the observed performance at each step meets the expected results. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 25 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 11. Interaction of auxiliary equipment. 12. Issues log. C. SOFT WARE DOCUMENTS. 1. GENERAL 1.1. This section sets out the requirements to be furnished for computer software used. 1.2. The Contractor shall supply all the draft copies of design note, circuit diagrams, application software source code listings and documentation during the various stages of design and development work. The final documentation shall be compiled and cared from all the previously submitted drafted copies. 1.3. Three sets of such final documentation shall be submitted within one month from the date of satisfactory field of the related equipment. One set shall be kept at the Master Station and updated by the Contractor as and when there are any changes during the maintenance period. 1.4. The Contractor shall supply all the operational manuals, system Programmer’s manuals and technical manuals for all the hardware, software and equipment. Such manuals documentation supplied by the Contractor shall contain sufficient information for any system programmer to carry out the design of this system, and for the maintenance engineer to carry out the future system maintenance and modification work. Such manuals shall be supplied at the first stage of the system design work. 1.5. Any part of proprietary software which is modified to suit this system shall be treated as application software. The Employer shall have all the rights to all the application software in this system. 1.6. The Contractor shall guarantee the support for any proprietary software for unlimited period of time. The complete program source code in both hard copy and magnetic tape of all the proprietary software shall be lodged with an appointed party approved by the S.O. In the event the Contractor go into liquidation, or is unable to provide further support to the system software, this copy of source code shall become the property of the Employer. 1.7. The Contractor documentation : shall supply the following hardware and software a) Application Software Documentation shall include : General system introduction to all programs including software organisation with the drawing. For each program: \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 26 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection i. General description of the program function, method of operation and full accounts of the facilities provided; ii. Specifications of performance with all its interfaces especially where the program share data with other programs. iii. Block Diagram and flow charts; iv. Memory maps for the CPU’s internal storage, and for the disks. The maps shall show the numbered locations of core memory. v. A programming guide showing how to run and operate the program and described the way the data or code has been laid out for modification, conversion or expansion in future. b) Hardware Documentation shall include : i. General system introduction to the hardware. ii. Detailed description of structure, information code formats, message structure and message security. iii. General Assembly Drawings showing the layout of equipment in cubicles together with details of modules. Site installation manuals and drawings. iv. v. 5.6.7 For each module : - Introduction - Specifications - Detailed description of module operation and circuit - Detailed description of all the circuit options by jumpers - Module functional block diagram - Module circuit diagram - Detailed component part list SUBMITTALS I. The following submittals are in addition to those specified in Division 1 Section "General Commissioning Requirements." II. Testing Procedures: The Contractor shall submit detailed testing plan, procedures, and checklists for each series of tests. Submittals shall include samples of data reporting sheets that will be part of the reports. III. System Readiness: The Contractor shall confirm in writing that systems, subsystems, equipment, and associated controls are ready for testing. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 27 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection IV. Certificate of Completion of Installation, Prestart, and Start-up: The Contractor shall certify that installation, prestart, and start-up activities have been completed. Certification shall include completed checklists as specified. V. Pipe Cleaning and Flushing Report: The Contractor shall certify that pipe cleaning, flushing, hydrostatic testing, and chemical treating have been completed, witnessed and sign off by Construction Manager Team. VI. Test and Inspection Reports: The Contractor shall compile and submit test and inspection reports and certificates, and shall include them in systems manual and commissioning report. VII. Corrective Action: The Engineer shall submit corrective action documents reports if the Plumbing, Sanitary, Fire Suppression System and Fire commission is not completed to an acceptable standard. VIII. Approved TAB Reports: The Contractors shall submit final TAB reports when approved by the Engineer. 5.7 EXECUTION 5.7.1 TESTING PREPARATION A. Prerequisites for Testing: 1. Plumbing, Sanitary, Fire Suppression System and Fire systems, systems, and equipment have been completed, calibrated, and started; are operating according to the OPR, BoD, and Contract Documents. 2. Plumbing, Sanitary, Fire Suppression System and Fire instrumentation and control systems have been completed and calibrated; are operating according to the OPR, BoD, and Contract Documents; and that pre-test set points have been recorded. 3. Certify that TAB procedures have been completed, and that TAB reports have been submitted, discrepancies corrected, and corrective work approved. 4. Test systems and intersystem performance after approval of test checklists for systems, systems, and equipment. 5. Set systems, systems, and equipment into operating mode to be tested (e.g., normal shut down, normal auto position, normal manual position, unoccupied cycle, and alarm conditions). 6. Verify each operating cycle after it has been running for a specified period and is operating in a steady-state condition. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 28 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 7. Inspect and verify the position of each device and interlock identified on checklists. Sign off each item as acceptable, or failed. Repeat this test for each operating cycle that applies to system being tested. 8. Check safety cut outs, alarms, and interlocks with fire alarm and life-safety systems during each mode of operation. 9. Annotate checklist or data sheet when a deficiency is observed. 10. Verify equipment interface with monitoring and control system and TAB criteria for each system and system. 11. Verify proper responses of monitoring and control system controllers and sensors to include the following: a). For each controller or sensor, record the indicated monitoring and control system reading and the test instrument reading. If initial test indicates that the test reading is outside of the control range of the installed device, check calibration of the installed device and adjust as required. Retest malfunctioning devices and record results on checklist or data sheet. b). Report deficiencies and prepare an issues log entry. 5.7.2 TESTING REQUIREMENT GENERAL A. The Contractor shall notify Project Manager / Construction Manager in writing of his programme to test and commission equipment and system at least 2 months before the actual execution. B. The testing and commissioning method shall be in accordance with the manufacturer instructions, the appropriate IPC and/or SNI (for Plumbing and Sanitary) and NFPA/SNI (for Fire) commissioning codes, Local authority requirement and this specification. C. The Contractor shall be responsible for obtaining all necessary licences as required by all relevant authorities before operation of any equipment/system. D. All testing and commissioning to enable proper operation of the Works shall be completed to the satisfaction of the Consultant/Project Manager/Construction Manager. Test systems and intersystem performance checklists for systems, systems, and equipment must be approved by Consultant / Construction Manager before proceeding. E. F. Perform tests using design conditions. 1. Simulate conditions by imposing an artificial load when it is not practical to test under design conditions and when written approval for simulated conditions is received from Engineer. Before simulating conditions, calibrate testing \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 29 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 2. 3. instruments. Set and document simulated conditions and methods of simulation. After tests, return settings to normal operating conditions. Alter set points when simulating conditions is not practical and when written approval is received from the Engineer. Alter sensor values with a signal generator when design or simulating conditions and altering set points are not practical. Do not use sensor to act as signal generator to simulate conditions or override values. G. Scope of Plumbing and Sanitary and Fire systems testing: 1. Testing scope shall include entire Plumbing, Sanitary, Fire Suppression System and Fire systems installation, from central equipment through distribution systems to each conditioned space. It shall include measuring capacities and effectiveness of operational and control functions. 2. Test all operating modes, interlocks, control responses, responses to abnormal or emergency conditions, and verify proper response of building automation system controllers and sensors. H. Detailed Testing Procedures: The Contractor shall prepare and submit detailed testing plans, procedures, and checklists for Plumbing, Sanitary, Fire Suppression System and Fire systems, subsystems, and equipment for Engineers/CM approval. I. Contractor/Contractor shall employ thoroughly competent and experienced personnel to carry out all tests and shall comply with all rules and requirement of the relevant authorities. J. Contractor/Contractor shall be responsible for the complete and thorough testing, commissioning, adjusting and balancing of the system and equipment installed and to bring into safe and reliable operation the entire Plumbing and Sanitary and Fire systems and the other systems included in Contract. K. The STP, WTP, Fire Suppression System and fire pump sets shall be commissioned only by qualified personnel and manufacturer Engineers. Detail and comprehensive commissioning procedures recommended by the chillers manufacturer shall be strictly adhered to. L. Plumbing, Sanitary, Fire Suppression System and Fire Instrumentation and Control System Testing: 1. Field testing plans and testing requirements are specified in the specification. The Plumbing, Sanitary, Fire Suppression System and Fire Contractor and the BMS Subcontractor shall collaborate to prepare testing plans. 2. The Contractor shall convene a meeting of appropriate entities to review test report of Plumbing, Sanitary, Fire Suppression System and Fire instrumentation and control systems. M. Pipe cleaning, flushing, hydrostatic tests and chemical treatment requirements are specified. Contractor shall prepare pipe system cleaning, flushing, and hydrostatic testing. The Engineer/Construction Manager shall review and comment on plan and final reports. The Contractor shall certify that pipe cleaning, flushing, hydrostatic tests, and chemical treatment have been completed. Water condition to be sent for lab test \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 30 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection after flushing and submit to Construction Manager/Engineer for record. Plan shall include the following: 1. Sequence of testing and testing procedures for each section of pipe to be tested, identified by pipe zone or sector identification marker. 2. Description of equipment for flushing operations. 3. Minimum flushing water velocity. 4. Tracking checklist for managing and ensuring that all pipe sections have been cleaned, flushed, hydrostatically tested, and chemically treated. 5. All water pipe shall be hydrostatically tested at a pressure equal to 1.5 times the maximum operation pressure or at least 150 PSI whichever is greater. 6. All Water for hydrostatic pressure testing of pipe work system shall be chemical treated with a suitable cleaning agent. The chemically treated water shall remain and total filled each section of the system until all sections of the system have been pressure tested and the complete system is ready for the pre-commission cleaning operation. 7. After the pressure test all pipes shall be flushed clean in sections. 8. The test pressure shall not be allowed to decrease by more than one (1) percent over 24-hours period. Leaking shall be repaired by re-welding, replacement of sections and joints or tightening of bolted flanges. Caulking of joint shall NOT be allowed N. Plumbing, Sanitary, Fire Suppression System and Fire Distribution System Testing: The Contractor shall prepare a testing plan to verify performance of Plumbing, Sanitary, Fire Suppression System and Fire plant, water distribution system. Plan shall include the following: 1. Sequence of testing and testing procedures for each item of equipment and section of pipe to be tested, identified by identification marker. 2. Tracking checklist for managing and ensuring that all pipe sections have been tested. O. Vibration and Sound Tests: The Contractor shall prepare testing plans to verify performance of vibration isolation and acoustic measures. The Engineer shall witness and approve tests and inspections. P. During the installation stage, all main duct work and risers shall be pressure tested in section. Q. All control system shall be calibrated under operating conditions until smooth and accurate operation conditions are attained. Control settings shall then be permanently marked on the control equipment. All calibration procedures shall be properly and fully recorded. R. The Contractor shall check, test, and adjust each and every sensor, controller, actuator and other accessories for the smooth and fine operation. S. All necessary costs for adjustments and replacements shall be borne by Contractor. T. The Contractor shall responsible for all electrical tests of all equipment before turning on and shall be represented by a competent electrical engineer during the whole of \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 31 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection period required for the tests. The Contractor shall supply all necessary instruments, apparatus, labour for the tests to the satisfaction of the Consultant / Construction Manager. The cost shall be borne by the Contractor. U. The Contractor shall submit performance tests to ensure that the equipment and system perform to the requirements of the specification. V. Deferred Testing: 1. If tests cannot be completed because of a deficiency outside the scope of the Plumbing, Sanitary, Fire Suppression System and Fire system, the deficiency shall be documented and reported to Consultant. Deficiencies shall be resolved and corrected by appropriate parties and test rescheduled. 2. If the testing plan indicates specific seasonal testing, appropriate initial performance tests shall be completed and documented and additional tests scheduled. W. Testing Reports: 1. Reports shall include measured data, data sheets, and a comprehensive summary describing the operation of systems at the time of testing. 2. Include data sheets for each controller to verify proper operation of the control system, the system it serves, the service it provides, and its location. For each controller, provide space for recording its readout, the reading at the controller's sensor(s), plus comments. Provide space for testing personnel to sign off on each data sheet. 3. Prepare a preliminary test report. Deficiencies will be evaluated by the Engineerto determine corrective action. Deficiencies shall be corrected and test repeated. 4. If it is determined that the system is constructed according to the Contract Documents, the Owner will decide whether modifications required to bring the performance of the system to the OPR and BoD documents shall be implemented or if tests will be accepted as submitted. If corrective Work is performed, the Owner will decide if tests shall be repeated and a revised report submitted. X. The Contractor/Contractor shall deploy at least 2 skilled and competent workers in Plumbing, Sanitary, Fire Suppression System and Fire work on a full time basis for minimum three (3) months after the Completion Date, to attend to complaints relating to poor performance and to re-adjust equipment to suit system. Y. If the test result that the plant and equipment is not functioning in a satisfactory manner or not complying with the performance requirement of the Specification, the Contractor shall carry out at his own expense such alterations, replacement and adjustments as may be required, to the Consultant/Project Manager / Construction Manager satisfaction. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 32 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 6.0 DEMONSTRATION AND TRAINING 6.1 GENERAL 6.1.1 SUMMARY A. This Section includes administrative and procedural requirements for instructing Owner's personnel, including the following: 1. 2. 3. B. Related Sections include the following: 1. 6.1.2 Demonstration of operation of systems, subsystems, and equipment. Training in operation and maintenance of systems, subsystems, and equipment. Demonstration and training videotapes and materials. Part B of the specification. C. The Contractor shall provide sufficient and proper instructions to be Owner Engineering staff in the commissioning, operation, maintenance, servicing, and trouble-shooting of the various plant and systems for a period of at least 2 (two) months during the Maintenance Period as directed by the Project Manager. D. The Contractor shall provide training facilities and training courses and ensure that the Owner’s staff will acquire full knowledge and appreciation of all aspects of the day to day operation, breakdown and routine maintenance, and fault diagnosis of all plant, equipment, and system installed under this Contract. Detailed syllabus and the timing of the training courses shall be submitted. E. The owner will nominate members of his staff to attend the training courses, and the Contractor shall allow them reasonable access to technical information and documentation required for proper operation and maintenance. The Contractor shall also explain this information and documentation to allow the trainees to become fully conversant with all aspects of the systems. F. When training is required to be held in overseas facilities, all necessary costs of airfare, hotel accommodation, local transportation, food, etc., for two (2) trainees nominated by the Owner shall be included. SUBMITTALS A. Instruction Program: Submit two copy of outline of instructional program for demonstration and training, including a schedule of proposed dates, times, length of instruction time, and instructors' names for each training module. Include learning objective and outline for each training module. 1. B. At completion of training, submit two complete training manual for Owner's use. Qualification Data: Qualifications of the instructor(s) \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 33 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 6.1.3 C. Attendance Record: For each training module, submit list of participants and length of instruction time. D. Demonstration and training videotapes and materials. QUALITY ASSURANCE A. 6.1.4 Instructor Qualifications: A factory-authorized service representative, complying with requirements in Division 1 Section "Quality Requirements," experienced in operation and maintenance procedures and training. COORDINATION A. Coordinate instruction schedule with Owner's operations. Adjust schedule as required to minimize disrupting Owner's operations. B. Coordinate instructors, including providing notification of dates, times, length of instruction time, and course content. C. Coordinate content of training modules with content of approved emergency, operation, and maintenance manuals. Do not submit instruction program until operation and maintenance data has been reviewed and approved by Engineer. 6.2 PRODUCTS 6.2.1 INSTRUCTION PROGRAM A. Program Structure: Develop an instruction program that includes individual training modules for each system and equipment not part of a system, as required by individual Specification Sections, and as follows: 1. Plumbing, Sanitary, Fire Suppression System and Fire Protection systems. 2. Plumbing, Sanitary, Fire Suppression System and Fire Protection instrumentation and controls. 3. Electrical service and distribution B. Training Modules: Develop a learning objective and teaching outline for each module. Include a description of specific skills and knowledge that participant is expected to master. For each module, include instruction for the following: 1. Basis of system design, operational requirements, and criteria. 2. BMS, IBMS, MMS & EMS programming and scheduling. 3. Documentation. 4. Emergencies. 5. Operations. 6. Adjustments. 7. Troubleshooting. 8. Maintenance. 9. Repairs \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 34 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 6.3 EXECUTION 6.3.1 PREPARATION 6.3.2 A. Assemble educational materials necessary for instruction, including documentation and training module. Assemble training modules into a combined training manual. B. Set up instructional equipment at instruction location. INSTRUCTION A. B. Instructors to train Owner's personnel to adjust, operate, and maintain systems, systems, and equipment not part of a system. 1. Engineer will to describe basis of system design, operational requirements, criteria, and regulatory requirements. 2. Owner will furnish an instructor to describe Owner's operational philosophy. 3. Owner will furnish Contractor with names and positions of participants. Scheduling: Provide instruction at mutually agreed on times. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 35 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 7.0 PIPEWORK, VALVES AND FITTINGS – PLUMBING, SANITARY, FIRE SUPPRESSION SYSTEM AND FIRE PROTECTION SERVICES 7.1 GENERAL The word `pipe work' or `piping' shall mean all pipes, drains, tubes, pipe fittings, valves including hangers, brackets, anchors, expansion devices, sleeves, and all accessories connected there to for the complete piping installation. All material installed shall be brand new, original manufacture (non-OEM). Used material shall not be accepted. Pipes shall have colour banding (without manual painting) to identify different grades. In addition, all underground piping shall be wrapped in polyethylene. Pipelines accessories such as gauges, meters, control devices, etc. shall have the same working pressure rating as the associated pipe work. All pipe work shall be free from burrs, rust and scale and shall be cleaned before installation. All personnel engaged on welding operations must possess a certificate of competence issued by an acceptable/recognized authority. All pipes and fittings supplied shall be as listed in the latest Local Authorities' approved list. Prior to any ordering or installation, the Contractor shall furnish the following information for endorsement: • • • • • • Manufacturer for all pipes and fittings. Specification and standard for all pipes and fittings. Manufacturers' data for all valves, strainers, pipe hangers, mechanical couplings, flexible or expansion couplings, gauges and for any other equipment as may be requested by the Project Manager. This shall include printed installation details, operation and maintenance instructions, performance data, complete parts lists, materials specification, recommended spare parts lists and any other information as may be requested by the Project Manager. Details of all pipes supports, thrust blocks, anchors and pipe guides. Drawings indicate the nominal sizes of pipes (read as ID = inside diameter) and the manner in which the various piping systems are to be installed. The actual work involved shall be ascertained by the Contractor, who shall co-ordinate the pipe work installation with the work of other trades and services. Proposed pipe testing and cleaning procedures. Contractor shall include for all valves necessary for the proper completion, working, isolation and regulation of the installation. Exposed pipe work will not be permitted in occupied areas without prior approval. Sizes indicated for pipes are nominal inside diameter. All pipe work delivered to site shall be new and shall be colour banded to identify different grades. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 36 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Changes in direction of pipes shall be made with long sweep elbows. Under no circumstances shall pipes be bent without the use of fittings. The Contractor shall be entirely responsible for ensuring compliance with any Authorities requirements for the stamping of valves and for the payment of any fees levied. Galvanised pipe sleeves shall be provided for pipe passing through walls, floors and beam. Where the wall and floors concerned are required to be watertight construction, cast-in puddle flanges shall be provided. All pipe work shall be installed in such manner to ensure that air cannot be trap and it can be drain. Sufficient union or flanges shall be provided to install and dismantle screwed or solvent jointed sections of pipe work. All fittings, valves, cocks and etc. shall be manufactured from materials against dezincification. 7.2 OPERATING AND TEST PRESSURES 7.2.1 WATER SYSTEM a. The operating pressure of piping systems shall equal the static head of the system plus the shut-off head of the pump (if any) connected to that system but in no case less than 1000 kPa (10 bar). b. All water services operating with design pressures above 2400 kPa (24 bar) shall be subject to a hydrostatic test pressure of 1.5 times the design pressure by an approved gauge placed at the highest point of each system. i. Water system operating with design pressures below 2400 kPa (24 bar) shall be subject to a hydrostatic test pressure of 1.5 of the design pressure, recorded by an approved gauge placed at the highest point of each system. ii. Special precautions shall be necessary to prevent damage to equipment, valves and fittings and also on lower sections of high rise building and the approval of the type and method of testing shall be obtained prior to proceeding. iii. All tests shall be conducted using treated water and pressures shall be maintained for a minimum of 24 hours without loss of pressure when corrected for ambient temperature change as necessary. iv. Refer also to “Commissioning and Testing” section of this Specification for flushing out and water treatment requirements. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 37 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 7.2.2 7.2.3 TESTING OF FUEL OIL AND HIGH TEMPERATURE OIL SYSTEMS A) Fuel Oil and high temperature oil systems shall be pneumatically tested to a pressure of 1.5 times the design pressure and comply with all Local Codes as appropriate B) On installations where damage to finishes due to possible leakage during testing is not likely, pressure testing shall be done by using the oil proposed (as the fluid medium), for the particular system. C) The test pressure shall be held for at least 24 hours without loss of pressure when corrected for ambient temperature change as necessary. D) Water shall NOT be used for testing of any oil systems TESTING OF OPEN VENTS AND DRAINS All open drains and vents shall be tested by capping off the lowest drain point and filling the line with the fluid being drained, and visually checking all joints for leakage. No pressure testing is required. 7.3 PIPE MATERIALS Pipes and fittings for the various services shall be in accordance with the following table: PIPE TYPE DESCRIPTION A Polyethylene HDPE PE 100 to AS 4130 B Galvanised steel pipe to ASTM 53 schedule 40 grade from 65 mm and above. schedule 40 grade for smaller than 65 mm Black steel pipe to ASTM A 53 schedule 40 grade from 65 mm and above. schedule 40 grade for smaller than 65 mm Unplasticised PVC pipe Class VP (10 kg/cm2) C D E Unplasticised PVC pipe Class VU (5 kg/cm2) F Copper to ASTM B88 Type L G Cast iron pipe to BS EN 877, DIN EN 1561, DIN 19522 FITTINGS/JOINTS Pipe connections: Butt welding or socket welding to manufacturer’s specifications. Fittings, should be comply to AS 4131 connection fixture or compression fitting Galvanized mild steel fittings to BS EN 10241: 2000 and flange joints to BS 4504 screw joint to BS 21 for pipe size up to 50 mm diameter. Mechanical coupling for pipe size 65 mm and above. Black mild steel fitting to ANSI B16.3 and flanged joints to BS 4504 screw joint to BS 21 for pipe size up to 50 mm diameter Mechanical coupling for pipe size 65 mm and above. UPVC fittings to JIS K6742 Class VP unless otherwise specified. Solvent welded joints to JIS K 6743. For larger fittings to JIS K 6739 using solvent cement to JIS K6743. For larger fittings to JIS K 6739. UPVC fittings to JIS K6742 Class VP unless otherwise specified. Solvent welded joints to JIS K 6743. For larger fittings to JIS K 6739 using solvent cement to JIS K 6743. For larger fittings to JIS K 6739. Copper fittings to ASME B16 silver brazing to be used for soldered joints (up to 50 mm diameter); or copper alloy flanged joints to ASME 16 (greater than 50 mm diameter) Cast iron fittings to BS EN 877, hubless joint with stainless steel collar and rubber seal ring.The inside coating is applied and \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 38 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection PIPE TYPE DESCRIPTION H PPR (Propylene random copolymer) I PP Pipe (Polypropylene Pipe) 3 layer J Black steel Seamless Pipe to ASTM A 53 schedule 80 grade from 65 mm and above. schedule 80 grade for smaller than 65 mm Acoustic Pipes and fittings K 7.4 FITTINGS/JOINTS burnt in in two separate layers of 120 µm each. To comply with ISO 21003 and ASTM F2389 for pipe and DIN 16962 for fittings. Faser composite. Pipe pressure class for hot and cold water shall be SDR 7.4 & SDR 9 type.Thermal conductivity for PPR material shall not more than 0.015 m/Wk. Pressure rating: 20 bar (PN20), 25 bar (PN25). Comply with EN 1451-1, ISO 7671, and AS/NZS 7671. Push-fit connection with integrated sockets and sealing rings. Green Building certified. Black mild steel fitting to ANSI B16.3 and flanged joints to BS 4504 screw joint to BS 21 for pipe size up to 50 mm diameter Pipes : Homopolymer polypropylene for the internal and external layers, mix of polypropylene and mineral loads for the intermediate layer’ Fittings : Homopolymer polypropylene + mineral charges, Ventilation Branch Fittings : (PP + Minerals) PIPEWORK TYPES Pipe work and fittings for the various services shall be in accordance with the following table: Maximal Working Pressure Pipe work Type (refer to table above) 16 bar B B B 16 bar B 16 bar B 16 bar, 25 bar B 16 bar B 16 bar 10 bar 5 bar 16 bar Gravity B G G G G Vent pipes Rainwater/ condensate pipework (c/w isolation) 5 bar 10 bar C G Storm water pipework (external buried) Rainwater pipework (building reticulation gravity drains down pipes) Sprinkler/Hydrant pipework (external buried) 10 bar G 10 bar G 25 bar B Service Sleeves Penetrations with puddle flange Raw/Recycled/Irrigation water pipework (external buried) Raw/Recycled/Irrigation water pipework (in plant rooms and for building reticulation) Clean water pipework (in plant rooms before pump installation) Suction header, discharge header Clean water pipework (in plant rooms after discharge header installation to roof tank) Clean water/recycle water pipework (building reticulation) after PRV Hot water pipework Soil/Waste water pipework (external buried) c/w isolation Soil/Waste/drainage water pipework (pumped) Soil/Waste water pipework (building reticulation) Soil and Waste water pipework \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 39 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Service Maximal Working Pressure Pipe work Type (refer to table above) Sprinkler/Hydrant pipework (building reticulation) 25 bar B Sprinkler Pre-action pipework (building reticulation) 25 bar B Condensate drainage connection to outlets (with isolations) 10 bar B Exhaust engine pipe (complete with rockwool insulation and C metal jacketing) Fire Suppresion Pipe/Novec Pipe (Seamless pipe) 300 bar J Notes (1) Cast iron piping required for kitchen waste water, Sewage Water, Waste Water and Rain Water pipework. (2) colour shall be different with clean water pipe All pipes/materials at refuge area shall be fire rated or steel. 7.5 PIPE JOINTS Cast Iron Couplings – Program Stainless Steel Coupling with Single Bolt Screw and EPDM Rubber Sealing shall be used for connecting both Cast Iron Hubless Pipe and Fittings. All Couplings shall be of Electrical Continuity type. Electrical Continuity Test Report shall be provided. The coupling shall be of Dukorapid Coupling type. Ductile Iron Pipes In general, for all types of joints, the pipe, the joint and jointing ring or material shall be thoroughly cleaned of dirt, grease and grit before any jointing commences. The pipe shall be properly supported, bedded and lined up before the joint is set up and made. Spigot and socket joint with rubber ring shall be made in accordance with the manufacturers' detailed instructions. The joint rings shall be cleaned, lubricated with the manufacturers' recommended material and accurately positioned. The joint shall be firmly pushed in. No lead caulked joints would be permitted. Flange joints shall be carefully cleaned, centred and lined up with only 3 mm allowed for the gasket between the faces of the flange. The flange gasket shall be carefully positioned and held by the flanged bolts. The bolts are to be tightened evenly and steadily all round the order of tightening being alternate or opposite as directed. Miscellaneous Pipe Joints Other types of proprietaries made mechanical couplings such as Victaulic joints may be used subject to Project Manager's acceptance/ approval. All screwed joints shall be made in accordance with BS 21 using jointing compound carefully selected to suit the type of service. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 40 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Sufficient joints shall be provided to ensure that access to equipment for maintenance, removal and replacement can be affected without dismantling large sections of pipe work or adjacent plant. Where pipe work is connected to items of equipment having flanges of dissimilar metal to the pipe work, and then isolating flanges of proprietary brand shall be used with plastic bolt inserts. No pipe joint shall be permitted within the thickness of walls or floors, etc. Pipe unions shall be installed to facilitate the future removal of pipe work in sections and where pipe work connects to fixed items of plant. 7.5.1 WELDING OF PIPE WORK Ferrous Pipe work Oxy-acetylene and metal arc welding of steel pipe work shall be Class II to BS 4515 as appropriate. Gas welding of steel pipe work of 65 mm and above shall not be permitted unless prior permission is obtained. The welding procedures and standards must be submitted for approval before any work commences. All personnel engaged on welding operation must possess a certificate of competence issued by an approved authority. These certificates must be produced for inspection by the Project Manager before any welding is undertaken. Each weld shall be given a suitable mark in order that the operative concerned may be identified. This will be rigidly enforced. Butt welds shall be made using the "single V" principle where the pipe ends shall be cut square and bevelled with all internal and external burrs removed. Pipes shall be properly aligned before welding is commenced and care shall be taken during the operation that the weld does not penetrate unduly and restrict the pipe bore. Branch welds shall be made using manufactured branch fittings accurately profiled to fit the pipe. The openings in the main shall be correctly shaped to coincide with the branch and both pieces shall have bevelled edges. All burrs shall be removed before welding is commenced and the branch piece shall not project into the bore of the main. The Contractor shall be responsible for providing adequate staging and protection from weather to enable the welding operations to be properly performed. No welding shall be carried out: a b c When surfaces of materials are wet; In rain or high wind; When the temperature of the parent metal is 5oC or below. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 41 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Because of the serious repercussions which will result in the failure of a weld in the plant rooms and the mains distribution, the Contractor will be expected to diligently supervise his welding labour force. The Project Manager reserves the right to order at random the cutting out of 2% of the welded joints for inspection and testing. Should any one of the above welds prove faulty in materials or workmanship, further removal of welds may be ordered up to a total of 4% of the total welded joints. If the number of welds failing the tests within the above 4% is sufficient to suggest that an operative is not consistent in his standard, the Project Manager may order any number of that operative's welds to be removed. The cutting out and repair of all such welds for inspection shall be at the cost of the Contractor. Again, because of the serious repercussions of a failed weld, in addition to the above, each weld made on pipes and fittings having a nominal diameter of 200 mm above shall be 100% and 25% below 200mm diameter shall be inspected and tested using an approved nondestructive inspection process (e.g. radiographic, etc.). The Contractor's attention is drawn to the magnitude of this task, the confines of the mains, and the time frame within which testing must be carried out. All testing shall be at the cost of the Contractor. Test for each weld so tested are to be recorded and passed to the Project Manager in approved form. Welding shall not be permitted on galvanized pipe work under any circumstances. The welding joints and the edge preparation shall be inspected by the Project Manager. Copper (general) Brazed joints shall be to BS 1723:1963. Welding rods shall be suitable for the piping materials and atmospheric conditions to BS 1845:1977. Copper (water work systems) Specific requirements for water work copper pipe work are as follows: • • 7.5.2 Pipework shall be to ASTM B88 type L, clean, dehydrated and hermetically sealed. Pipe shall be supplied in straight lengths. If necessary to meet a specific purpose annealed tubes (supplied in straight lengths or coiled) can be supplied and installed. Pipe joints shall be silver soldered to ASTM 828. FLANGED JOINT A. Flanged joints shall be made according to BS 4504. Flanges shall be smooth machined across the width of the flange and on the edge. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 42 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection B. Blank flanges where required shall be manufactured from the same material and thickness as the flanges to which they are mating. C. Flanges shall be mounted square with the axis of the pipe after removing all surface scale, oxides, grease, oil and dirt. D. Gaskets for flanges joining shall be reinforced neoprene full face gaskets to BS 1737. E. The gasket applied shall be suitable for temperature, pressure and type of fluid. 7.5.3 PIPE FITTING A. Pipe fitting shall be as specified hereunder for the various pipe materials. B. Long sweep bends shall be used in preference to round elbows wherever practicable. Square elbows shall not be used. Tees shall be of easy sweep of twin elbow pattern except where square tees are required for venting or draining etc. C. Bushes shall not be used and where a reduction in pipe size is required reducing sockets shall be used. Eccentric reducing sockets shall be used wherever necessary to ensure proper drainage of elimination of air pockets. Reducers on vertical pipe work shall be concentric. 7.5.4 PIPE SUPPORT Piping shall be supported from the building structure and shall support the sum of the load of a water-filled pipe plus a minimum of 120 kg applied at the point of hanging. The support system shall be in accordance wioth BS 3974. Vertical pipe work shall be supported at intervals of at least one per floor level, and at any piping change of direction (bend or elbow). Horizontal pipe work shall be supported by adjustable flat iron or clevis type hangers hung by hot rolled steel rods of the following diameters and at the following spacing, subject to the Engineers approval. All hanger materials are to be galvanized including Nuts, Bolts and threaded rod. Pipe material uPVC (unplasticized polyvinyl chloride) Steel Pipe size (DN) 25-40 50-80 100 150 15 20-32 40-50 65-100 125 150 200 Support distance Horizontal Vertical (m) (m) 0.9 1.2 1.4 2.0 1.9 2.8 2.3 3.4 1.8 2.4 2.4 3.0 2.4 3.7 3.0 4.0 4.0 4.5 4.5 5.5 6.0 8.5 Diameter of rod (mm) 8 10 12 16 8 10 10 12 16 18 25 \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 43 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Pipe material Copper pipe type L Pipe size (DN) 20 & 25 32 & 40 50 65 Support distance Horizontal Vertical (m) (m) 1.2 2.0 1.8 2.5 2.1 3.1 2.4 3.6 Diameter of rod (mm) 10 10 10 12 *) or as per manufacture's recommendation. Submit proposed pipe support details to Engineer for approved for sizes and materials not listed. The end of the steel rods shall be threaded and not welded to threaded bolt. Hangers shall be supported by means of approved fasteners as shown on the drawings. Wood plugs shall not be used. Unless allowed by the structural engineer, power fixings may be used for pipe work of diameter less than 50 mm. Expansion fasteners may be used for vertical pipe work under 100 mm diameter. Additional supports shall be provided adjacent to valves etc., and other large pipeline mounted items to prevent undue strain on adjoining pipework. Additional supports shall also be provided adjacent to pump connections etc., to prevent undue strain on plant. The contractor shall be responsible for the building in of all supports etc., and Contractor should allow for using ‘Philips Red head Bolt’ or similar fixings for concrete and cutting away and building in of brackets in brickwork etc. Contractor should note that it may not be possible to fix bolts directly above the pipes to be supported and cantilever angles above the pipe channels are to be used where required. All supports, hanger brackets, etc., shall be of hot-dipped galvanised mild steel construction to BS729:1971 part 1 with min. Coating of 85 and 210 for indoor and outdoor installation respectively. All bolts and nuts shall be electroplated with zinc or cadmium to BS 3382: parts 1 and 2 with minimum plating thickness of 25. Neoprene gasket shall be provided between clamp and pipe or dissimilar material. Vertical pipe work shall be guide or supported in the centre of each riser with steel brackets to prevent swaging, sagging and vibration. Vertical riser pipes shall be supported at the base and the support shall withstand the total weight of the pipe and fluid contained. Supports shall not be allowed in such a way the pipe will be in direct contact with the building fabric or structure. Plastic pipework shall be supported using the pipework manufacturer’s standard support clip. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 44 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection All chilled water pipework shall be supported around the insulation and not the pipe work directly with due care not to damage the integrity of the vapour barrier. Double banking of pipe work from a single support position will be allowed, provided the normal operating temperatures of the fluids in the two pipes do not differ by more than 30C. Triple banking is not permitted. Where double banking is permitted due to space restriction, the larger of the two pipes shall be uppermost. Where pipes are the same size but of different materials, then the pipe having the lowest coefficient of expansion shall be uppermost. Support spacing for doublebanked pipework of different sizes shall be based on the similar size. 7.5.5 PIPE ANCHORS, THRUST BLOCKS AND EXPANSION Anchor points shall be provided where necessary whether this is shown on the Drawings or not and shall be constructed from channel iron secured to the building structure. Anchors shall be positioned in association with pipework change in direction and propriety expansion compensators, etc., such as to absorb the stresses due to pipe work expansion and internal pressures by transmission of such forces to the ground or structure at appropriate points. The contractor should particularly note that in addition to serving the purpose of constraining the pipeline, the anchors may be used in connection with the testing of pipe work, and at such items, it will be necessary to have the extreme ends of the main being tested held with the anchors to prevent the pipeline drawing apart due to the thrust pressures exerted at the two ends of the pipe. All details and sizes of thrust and anchor blocks shall be submitted for approval. Stress in pipe work due to expansion and contraction shall be kept below the yield point. Whenever possible expansion and contraction shall be absorbed by natural offsets and changes in pipe directions. When it is not possible to accommodate expansion and contraction of the pipe work as described above, expansion devices shall be provided in the pipe work installation. The exact location and working details including anchor loads of all expansion devices, guides and anchors shall be submitted to the Architect for approval. Connections to plant and equipment shall be made so that no stress is placed on the equipment or its connections. Where the pipework installation is required to be tested in sections, extra anchor point shall be installed where necessary for protection of the expansion devices. Each axial expansion device shall be guided as close as possible on both sides of the joint, but in no case more than 1.5 diameters away. A further set of guides shall be installed at a \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 45 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection distance not more than 15 diameters away from the device or more stringent requirements imposed by the manufacturer. 7.5.6 AUTOMATIC AIR VENTS a). Automatic air vents cocks of adequate size and approved by the Engineer shall be provided at all high points on water pipe works riser of along pipe line where air lock is deemed possible. b). Where such points are inaccessible, air bottles shall be provided with the vent pipe turned over and carried down to a point 1200mm above floor level, terminating in a vent cock. c). Automatic air vents shall gunmetal or brass body, non-ferrous or stainless-steel floats and guides and non-corrodible valve seats. Each valve shall incorporate a lock shield valve and the discharge pipe shall be run to the nearest agreed drain point. 7.5.7 GUIDES Pipe guides shall be installed for all pipe work. Guides for ferrous pipe work shall be of mild steel riders welded to the pipes on roller or P.T.F.E sliding supports restrained with U-bolts on brackets or as otherwise detailed on the Drawings. 7.5.8 PIPE SLEEVES Pipe sleeves shall be provided and installed by the Contractor for casting in where pipes penetrate the concrete structure. The minimum clearance between the pipe and pipe sleeve shall not be less than 25 mm, unless noted on the drawings. Sleeves through fire rated partitions or walls or floor shall be of galvanised wrought iron pipe. The annular space of pipe sleeves shall be tightly packed with approved fire-rated material. Where sleeves occur in finished spaces, solid close fitted chrome plated steel plates secured by screws shall be provided. The Contractor shall set out all core holes and sleeves in floors, walls, beams and columns in conjunction with the fixing of form work and/or placing of concrete and checking that the location of any core holes and/or sleeves already installed are correct. To prevent weakening of the building structure all core holes shall be approved by the Project Manager prior to placing of concrete. Every pipe passing through a core hole shall be back filled with concrete to the satisfaction and approval of the Project Manager. 7.5.9 INSTALLATION STANDARD \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 46 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection All pipe work shall be installed to meet structural, architectural, and functional conditions and shall not interfere with the work of other trades. All pipe work shall be installed and supported so that it is free from excessive stresses due to weight from its contents plus its own dead weight, dynamic forces due to liquid movement, and expansion and contraction due to change in temperature. Expansion joints shall be provided in accordance with AS 3500.4. Pipe work connected to the pumps shall be separately supported so as not to impose any load on the pump casings. Care shall be taken to ensure neat and workmanlike appearance as well as true alignment and grade. Every care shall be taken to prevent air pockets in pipe work. Where necessary, air vents shall be fitted and shall be connected by piping to drain into the nearest floor drain. Pipes stored at site or installed shall have their ends closed with a metal cap or plugged with a wooden plug to prevent any ingress of debris or whenever possible. All pipes deliver to site must be inspected before unloading from transportation by Construction Manager Team. Rejected pipes to be remove immediately from site. All steel pipes deliver to site must produce mild certificate enclose with delivery order. Failure to comply, Construction Manager have the right to reject those pipes deliver and to be remove immediately. Long sweep bends shall be used whenever practicable. Neither square bends nor bending pipes on site shall be allowed. When the size of pipes exceeds 50mm diameter, approved fire collars shall be fitted at all positions where such pipes pass through fire rated constructions. Copper pipework to be installed in accordance with the following: Piping systems to be installed in accordance with practices detailed in CDA Handbook the Cooper Tube Hand book. 7.5.10 PIPE PRESSURE TESTING Test pressures, which shall be one and half of the working pressure unless otherwise directed, are to be maintained for 24 hours with drop does not allowance The Project Manager shall be given advance notice when testing is to be carried out so that he may have the opportunity of witnessing the tests. The Contractor shall supply a suitable \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 47 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection pump, pressure gauges, connections etc. and so all necessary work for carrying out the various tests. The Contractor shall keep on site a record book of the tests carried out which shall be signed by the Project Manager upon satisfactory completion of the Test. The proposed format of the book shall be submitted for approval. Plant and regulating valves shall not be connected to the respective services while tests are in progress. Particular care must be taken to exclude all air from the systems during tests. 7.5.11 VALVES GENERAL All valves shall be of approved manufacture complying with the working pressure involved. All valves shall preferably be of a single make and as detailed elsewhere in this specification. Valve working pressure shall be selected minimum the same as working pressure of the services. Valves shall be so installed as to be readily accessible for testing and maintenance. Valves shall close in less than 5 seconds when operated at maximum possible speed from fully open position. All stop valves shall be right-handed i.e. turned clockwise to shut. Controlling wheels shall be clearly marked showing in which direction the wheel is to be turned to close the valve and an indicator which shall show whether the valve is open or shut. All stop valves in the water supply main and the main stop valve shall be secured open by a padlocked chain/leather strap. Test cocks shall be provided at all locations shown on the drawing and the following locations: a b 15 mm diameter cock with hose bib attachment downstream of each flow switch; 20 mm diameter cock downstream of pressure switch at discharge of all plumbing pumps. All valves in each instance shall be suitable in all respects for the class of service and function. All valves shall be sized not less than the pipe size. Valves installed inside plant room and more than 2 m above floor level shall be provided with chain operators. All valves for all functions shall be identified by means of a tag or label which shall clearly indicate the following: a Service; b Valve number. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 48 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection All valves and accessories for thermal oil system must be able to suit for high temperature of the system (min 350ºC) and made of cast steel. 7.5.12 ISOLATING (GATE) VALVE Up to 50 mm: Bronze gate to BS 5154 series `B', rising stem, solid wedge disc, inside screw, union bonnet; female threaded (BS 21) connection; fitted with enamelled metal and hand wheel. Valves for working pressure above 20 bars shall be to BS 5154 PN 32 series B. 65 mm and above: Ductile or Cast-Iron steel body to BS 5154 (or better), bolted bonnet; solid wedge disc and bronze trim; inside screw, rising stem, flange connection (PN 25), fitted with cast iron hand wheel. Valves for working pressure above 16 bars shall be of PN 25 cast steel wedge gate valve with flanges. 50mm and above for hydrant services: Butterfly valve ULFM approved for fire hydrant allocation. OS&Y type shall use for firefighting installation. 7.5.13 CHECK VALVES Check valves shall be designed to prevent grinding of seat and disc after assembly, with removable cap for inspection of bearings and disc movement. Valves shall be flanged (PN 25) cast steel body, 316 stainless steel trim, spring and disc. Fire services valves shall be flanged to PN32. For valve size 65 mm diameters and above: Provide silent check valves of the non-slam, centre-guided globe type or duo check type. Valves shall be so designed such that closing action is controlled by spring to return disc to seat before zero velocity and before reversal of flow takes place in pipeline. Valves shall be provided with flanges to PN 25. Discs shall be free floating, centre-guided and controlled by velocity of flow without aid of grease or counterweight balance. For valves 50 mm diameter and below: Swing check valve to BS 5154 series `B', bronze, with removable hinge pin and screwed cap, suitable for operation in either horizontal or vertical position. Threaded (BS 21) connection for 50 mm and smaller. For valves above 20 bar working pressure, class 300 carbon steel swing check valve with PN 25 flanges and provide with clean out plugs and generally with offset swing flappers. Also provided with removable cap, re-grinding disc and seating ring. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 49 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 7.5.14 PRESSURE RELIEF VALVES Each pressure relief valve shall be of the fully enclosed type and fitted with hand casing gear. Each pressure relief valve in a pressure reducing station shall have a flow capacity equal to that of the pressure reducing valve. Pressure relief valves in locations other than reducing stations shall have flow capacities equal to that of the associated equipment. For Fire Fighting shall use UL/FM type. 7.5.15 PRESSURE REDUCING VALVE (PRV) and PRESSURE RESTRICTING VALVE (PRAV) • PRESSURE REDUCING VALVE Pressure reducing valves shall be provided where water pressure exceeds 400 kPa (4 bar) for plumbing system and 10 bar (for hydrant and sprinkler system). Pressure reducing valve shall be full port. Pressure reducing Valve can be installed either vertically or horizontally. For Plumbing Installations (non-UL type): Valves shall be pilot operated, single seated, tight closing, internal spring loaded, with spring suitable for the proper pressure differential. Pressure reducing valves shall have low flow by-pass to reduced inlet Pressure to avoid cavitation, screwed flanged ends or flanged end or groove ends. PRV shall be of bronze construction, stainless steel spring, neoprene high temperature resisting diaphragm, provided with stainless steel strainer and adjusting screw with locknut. For Fire Fighting (UL type) : Pressure Reducing Valves is indispensable in any fire protection system. Diaphragm actuated shall highly reliable and easy to maintain. A globe or angle shall be patterned with a full range of adjustments. Body coating shall be epoxying coating (internal and external epoxy coating) of the main valve wetted surfaces. Pressure Reducing Valves shall automatically reduce a higher inlet pressure to a steady lower outlet pressure regardless of changing flow rate and/or varying inlet pressure. The valves pilot control system sensitively to slight downstream pressure fluctuations, and shall automatically open or close to maintain the desired pressure setting. The downstream pressure can be set over a wide range by turning the adjustment screw on the CRD pilot control. The adjustment screw is protected by a screw-on cover, which can be sealed to discourage tampering. Typical Application Underwriters Laboratories requires the installation of pressure gauges upstream and downstream of the Pressure reducing Valve. A relief valve of not less than 1/2 inch in size must be installed on the downstream side of the pressure control valve. Adequate drainage for the relief valve discharge must be provided. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 50 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Main valve body & cover: Ductile Iron - ASTM A536 Main valve internal trim: Bronze ASTM B61 Pilot control system–Pilot control valve: Bronze ASTM B62 with Stainless Steel 303 internal trim.Copper tubing with brass fittings Main valve and pilot valve diaphragm and disc: Buna-N® synthetic rubber End Details: 300# (Ductile Grooved End). Pressure Differential 10 PSI Min. Pressure Adjustment Range: 300 lb. Class 30 – 165 psi • PRESSURE RESTRICTING HOSE VALVES (PRAV) Pressure restricting hose valves are used to restrict the pressure of flowing water up to 175 PSI. They are angle hose valves with preset orifices which restrict the volume of water and thereby lower the pressure of the flowing water. NFPA requires restricting valves where the inlet pressure exceeds 100 PSI. Pin may be removed by fire fighters to allow fully open valve. Unlike pressure regulating (reducing) type valves, pressure restricting valves have no effect on the static pressure of a system. Specifications: • • • • • U/L Listed & FM Approved 175 PSI max operating pressure NPT inlet or grooved inlet options Material: Cast brass Special threaded outlets shall follow local standard. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 51 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 7.5.16 Water Hammer Eliminator The Water Hammer Eliminator shall be Bronze Body and HA Assembly shall consist of Silent Check Valve, Ball Valve, Y-Strainer & Piping System. The HA Unit shall be able to eliminate the back pressure and noise caused by stopping of the booster and transfer pumps. A check valve of ductile iron body shall be installed just after the pump, also ensure that the HA Unit be installed downstream of the first check valve. When the pumps stop, the HA Unit shall successfully release water hammer pressure by discharge water from the drain port. The HA drain shall connect to the water tank or discharged to a floor trap connection. • • • Working pressure: 10 bar Working temperature: 0 to 60ºC Shock elimination ability: 300 bar Number of HA unit shall be installed as per Manufacturer recommendation. 7.5.17 Water Hammer Arrester Water Hammer Arrester shall be installed in typical toilet units. Water Hammer Arrester (shock Absorber) manufactures from stainless Steel tube with excellent corrosion resistance, with pistons and O-ring and the air layer which is completely isolated from water by O-ring. The O-ring shall be guaranteed life span. The product shall be manufactured to meet the PDI (the Plumbing & Drainage Institute) specification and to ensure perfect operation as a water hammer arrester and has been checked and proven through 100.000 cycle tests. Product specifications: 1. Body : 304 SS 2. Piston : PP 3. O-ring : EPDM (2EA) 4. Adapter : Stainless Steel 5. Air chamber capacity for 4kg/cm² air change 6. Air vent valve : brass Cr coating. 7. Operating pressure : 10 kg/cm² 8. Maximum operating pressure : 32 kg/cm² 9. Maximum operating temperature : 100ºC 7.5.18 BUTTERFLY VALVES Butterfly valves shall be double eccentric type with double integral flange. Valves shall be capable of drop tight service at least 10% higher than the specified working pressure when installed between flanges. Dead-end capability shall also be drop tight at the full rated pressure. The body shall be of cast steel or ductile iron to meet the specified working pressure. An interval travel stop shall be cast in the body to provide positive close positioning. Seat shall be suitable for the service temperature. It shall be mechanically retained, field replaceable \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 52 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection and provide continuous 360o seating. Disc shall be aluminium-bronze or equivalent. Disc design shall provide maximum flow area, high capacity with equalinear flow characteristics. The shaft shall be of stainless steel 316 or equivalent with working pressure suitable for above 20 bar (PN 20). The shaft shall be two-piece types and fasten to the disc by means of taper pins or disc screws. Valves shall have upper and lower inboard bearing providing strength and low friction for easy operation and lifetime service. The valve upper shaft shall have bushing providing additional support for absorbing side thrust load and bi-directional packing suitable for pressure or vacuum service. All manual butterfly valves up to 150 mm shall be fixed with 10 position locked levers. Valves over 150 mm shall be fixed with hand wheel worm gear type with position indicators and limit stops to adjust at full open and full close. For Fire Fighting shall use UL/FM type 7.5.19 GLOBE VALVES Up to and including 50 mm size, globe valves shall be of bronze globe type with inside screw, stuffing box and screw end connections. For 65 mm size and above, globe valves shall be of cast iron/ductile iron body for PN 20 and PN 25 respectively, with outside screw and yoke type, with flanged end connections to BS 4504. Globe valves shall have re-grinding renewable disc and seat ring, bronze trimmed non-rising stem. For Fire Fighting shall use UL/FM type 7.5.20 BALL / FLOAT VALVES Equilibrium type to BS 1212: Part 1. Foam plastic ball float with stainless steel rod and double lock nuts or copper ball float complete with brass rod. The valve shall be made of cast iron or bronze body and suitable for minimum working pressure to PN 16. Screwed joints shall be provided for up to 65 mm diameter and flanged joints for 80 mm diameter and above. 7.5.21 AUTOMATIC AIR RELIEF VALVES Provide automatic air vent at all high points, whether shown on the drawings or not. Automatic air vent shall be of float type. Drainpipe shall be provided and terminated at nearest floor drain or waste. Locking device to be provided, so that the valve can only be opened when the water level drops to a pre-determined level. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 53 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection For Fire Fighting shall use UL/FM type 7.5.22 SOLENOID VALVES/MOTORIZED VALVES Each solenoid valve shall be of the packless type with coils wound for 230-volt AC operation and requiring power to open and of adequate capacity to ensure that the valve shall open with maximum pressure differential that will be encountered in the installation. Each valve shall have a bronze body screwed to BS 21, stainless steel disc and stainless-steel seat unless indicated otherwise for the service. Solenoid valves shall be installed strictly in accordance with the manufacturer's instructions. The valve shall be suitable for the system working pressure and of minimum PN 20. 7.5.23 STRAINERS Strainers shall be installed on all systems and equipment susceptible to damage from dirt, grit or foreign matter including, but not limited to pumps, control valves and where required and indicated. Strainers shall be Y-pattern bucket type of not less than full line size. Unit shall be constructed of cast iron or copper alloy body with stainless steel screen of perforations. The total perforation area shall not be less than twice the cross-sectional area of the pump suction pipe. Strainer with working pressure above 20 bars shall be of cast steel type. For sizes up to 50 mm, screwed connection shall be used whilst flanged joints (PN 20) shall be used for 65 mm and upward. Flanged shall be to PN 25 for valves with working pressure above 20 bars. Drain cocks shall be provided on all strainers over 50mm. a b c 7.5.24 Size 15 - 50 mm Y-type strainers with screwed cover, 18/8 stainless steel screen, 26 SWG with 0.8 mm perforations. Ends screwed BS 21 taper thread. Service Rating : 10oC to 100oC 10.5 bar 186oC sat steam. Size 65 - 150 mm Y-type single basket strainer, 20 mesh stainless steel screen, bolted cover. Flanged and drilled to BS 4504. Size 200 mm and above Bucket type strainers, 40 mesh stainless steel screens, bolted cover. Flanged and drilled to BS 4504. PRESSURE SWITCHES Pressure switches including differential pressure switches shall be of acceptable design. They shall be electrically operated and of diaphragm, bellows or bourdon tube operating type and shall have adjustable set points with an integral time delay devices. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 54 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Pressure range shall be graduated in metric and shall not exceed the anticipated maximum operating pressure or maximum operating differential pressure at that point or points in the pipe by more than 50%. 7.5.25 PRESSURE GAUGES Pressure gauges shall conform to BS 5180 - "Bourdon tube pressure and vacuum gauges". The maximum scale value of the gauge shall be about 150% of the anticipated maximum operating pressure. It shall be graduated both in units bar and kg/cm2 Provisions shall be installed to enable each pressure gauge to be easily removed without interruption to the installation. A stainless-steel pulsation snubber shall be used in conjunction with the pressure gauge. Gauges shall have an enamel iron case, 100 mm diameter dial face, threaded chromiumplated brass ring with heavy glass, bronze spring tube, precision movement micrometer adjustment. Pressure gauge shall be installed with gauge cocks mounted in a location where they are easy to read. 7.5.26 DOUBLE REGULATING VALVES Double regulating valves shall be installed as shown on the drawing for water balancing purposes. Valves shall be suitable for the working hydraulic pressure and installed with the valve stem truly vertical or horizontal. Size up to 50mm. a). Disc, bonnet and body shall be of gunmetal construction. Seats rings shall be carbon filled TFE. Valves stem shall be stainless steel. b). Valves shall have differential pressure readout ports across valve seat area. Read out ports shall be filled with internal NPT tapped drain port. c). Valves shall have memory stop feature to allow valve to be closed for service and reopened to originally set position. d). Precise double regulation with indicator. Pressure and water flow relationship at different pre-set graduation shall be read off from certified flow charts. Once set, the position of the regulation shall be tampering proof. e). Valves shall be complete with the facilities for flow measurement, regulation and isolation. f). Valve shall be screwed end connection to BS21. g). Valves shall be lock tight at full rated working pressure. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 55 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Size 65 to 350mm a). Bonnet and body shall be of cast iron construction of high quality to BS1452 Grade 220 (up to 2100kPa) or cast steel construction of high quality to BS1504-161 Gr 480 (up to 4000kPa). b). Cast iron disc with bronze trim and stainless-steel stem. c). Readout ports, drain port and memory stop feature shall be same as balancing valves up to 50mm. d). Precise double regulation with indicator. Pressure and water flow relationship at different pre-set graduation shall be read off from certified flow charts. e). Valves shall be complete with facilities for flow measurement, regulation and isolation. f). Valve shall be leak tight at full rated working pressure. Flow measurement accuracy shall be within +-5% across complete range of flow rates from 10% to 100%. At completion of the work, one new set of test equipment shall be handed over to Construction Manager Team for subsequent monitoring and adjustment by the Owner Staff. 7.5.27 PIPE ANTI VIBRATION CONNECTORS Flexible connectors shall be provided to prevent vibration from all rotating equipment. Flexible locators shall be located as close to the rotating equipment as practical. Pipe line vibration eliminators shall be of stainless steel convoluted bellows type. The unit shall be suitable for working pressure of 150% greater than the maximum operating pump head. Provide flanged stainless steel corrugated hose with braid as necessary to satisfy pressure requirements in order to absorb axial and lateral movements. Care shall be taken to restrain longitudinal thrust due to internal pressure in the flexible connectors. Piping shall be anchored on the side of the flexible connectors remote from the rotating equipment. The manufacturer's recommendations for the installation of flexible connectors shall be strictly observed. Where flexible connectors are used, the flanges of these connectors shall be drilled and tapped to avoid the use of nuts on flange bolts. Flange bolts shall not project more than one thread through the flexible connection flange. 7.5.28 EXPANSION JOINTS Expansion joints shall be provided for the pipe work passing through the building expansion joint whether is shown on the drawings or not. Expansion joints shall be of reputable proprietary make and constructed of monel or stainless steel convoluted bellows, flanged connection, stainless steel line and expansion restraining bolts or limit stops, compression restraining T-rings, working pressure compatible with the piping system. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 56 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Working pressure of the expansion joint shall not be less than twice the system pressure involved. Wherever necessary, due allowance shall be made for the expansion and contraction of pipe work by change in direction of pipe work, or expansion loops, whether shown on the Drawings or not. 7.5.29 GASKETS Gaskets shall be suitable for temperature, service and pressure of system, installed in accordance with manufacturer's recommendations. Make-up flanged joints with one-piece ring gaskets, 1.5 mm thick neoprene rubber. Flanged joints between dissimilar metals: insulating gaskets, sleeves and washers between flanges, bolts and nuts respectively. Gaskets shall conform to ANSI 816.21 and ASTM 2000. 7.5.30 FLOW SWITCHES Flow switch shall be electrically operated. They shall be so located that there is a straight horizontal run of five pipe size diameters on each side of the flow switch or as recommended by the flow switch manufacturer, whichever is greater. The flow switch shall be suitable for the pipe size and expected flow rate and shall be furnished with adjustable flow setting. All parts to the flow switch which may come into contact with water shall be of non-ferrous pipe to prevent any electrolytic action. 7.5.31 WATER LEVEL CONTROLLERS Water level controllers shall be provided and fitted in all water tanks for monitoring the water levels in the water tanks and give the appropriate control/warning signals for the system. Water level controllers shall be of the float less type using water-proof sensing electrodes with controller containing the switching circuitries and control relays, suitable for conductive liquids like water and dilute acidic fluid. It shall be used to automatically operate sequential pump sets and give low- and high-level alarms. However, provisions shall also be provided for manual override to enable manual operation of pump sets. Sensing electrodes and the controller shall be suitable for operating temperature of up to 55 degree C. 7.5.32 THERMOMETERS All thermometers shall be installed as indicated on the drawings. All thermometers shall be the Industrial Heavy Duty type. All thermometers may be either 4" Ø ( 100 mm Ø ) dial face or direct reading alcohol and in the range suitable for the particular temperature service. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 57 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection All thermometers must be installed in immersion wells of approved manufacture. These wells shall be filled with an approved heat transfer medium. All thermometer and gauges will be calibrated prior to installation. Calibration certificates must be submitted to the Project Manager as a condition of acceptance of the installation as complete. 7.5.33 UNDERGROUND PIPE PROTECTION A). All underground pipe work of copper or steel construction where located below ground or within corrosive areas shall be adequately protected with a protective wrapping of Denso-tape or similar arranged in two applications. B). The first application shall be installed with a minimum 50% overlap when covered in spiral formation over the pipe and the second application with a minimum 25% overlap when covered in a reverse spiral formation over the previous layer. Tape widths shall be as recommended by the manufacturer for the size of pipe to be covered but shall not be less than 75mm wide for pipe work up to 50mm dia. 7.5.34 CAST IRON PIPE. Cast Iron pipe SML – tar free cross-linked epoxy coated hubless piping system according to DIN EN 877 standard for sewage/sanitary/drainage rainwater system. 1. GENERAL The Inside and Outside and above and Below Ground Drainage/Waste/Rainwater down Pipe Systems shall be of Cast Iron TAR-FREE Cross-Linked Epoxy Coated Hubless Pipes and Pipe Fittings. They are Hubless Pipes and Fittings joined by Electrical Continuity Stainless Steel Coupling with EPDM Rubber Seals. The Cast Iron Hubless Pipes shall be made of Hot Mould Centrifugal Casting process Duker SML Hubless Pipe Systems. The Cast Iron Drainage Hubless Pipes and Fittings shall meet and test to the following standard and requirement: DIN EN 877 STANDARD These are in compliance with the requirements at the quality and inspection regulations “Cast Iron Drainage Technology” RAL-GZ698. The Cast Iron Tar-Free Cross-Linked Epoxy Hubless Pipe & Fittings shall be the product of a manufacturer who has been ENGAGED in the manufacturing of Cast Iron Drainage Hubless Pipe System for the last 10 years. Full range of Pipe/Fittings from 50mm to 400mm shall be available from the same manufacturer. The factory shall be having ISO 9001:2008, ISO 14001:2004 & ISO 50001:2011 Certificates. 2. PHYSICAL PROPERTIES OF CAST IRON DRAINAGE HUBLESS PIPING SHALL BE AS FOLLOWS: - \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 58 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection PHYSICAL PROPERTIES/PERFORMANCE Minimum Tensile Strength 20 daN/mmÇ (200 Mpa) for pipes Minimum Tensile Strength 15 daN/mmÇ (150 Mpa) for fittings Modulus of Elasticity: 11000 daN/mmÇ Coefficient of Expansion 1mm/m/100°C FLOW CHARACTERISTICS The Pipe Manufactured by Duker’s Hot Mould Centrifugal casting process has an exceptionally smooth inside surface and secure highly efficient Flow Characteristics and minimum maintenance. 3. PERFORMANCE OF SML NON-COMBUSTIBLE SML meets Class A1 (Non-combustible) according to DIN EN 13501-1. 4. SYSTEM WORKING PRESSURE All Cast Iron Sewage / Drainage System shall be rated at minimum 5 Bar while Restraint Coupling Collar shall be used as required. 5. MATERIAL Pipes and Fittings shall be manufactured from Grey Cast Iron According to DIN EN 1561 Type at least EN-GJL-150. The Mechanical Properties exceed the requirement of EN 877. Pipes, Fittings and coupling shall be of the same manufacturer. 6. 7. TAR-FREE CROSS LINKED EPOXY COATING Pipe Inside Coating : All Pipes Inside Coating shall be of TAR-FREE Cross Linked Epoxy Process Type with thickness of 120μm (MICRONS). Pipe Outside Coating : All Pipes Outside Coating shall be of ANTI-RUST RED PRIMER with thickness of 40μm (MICRONS). Fittings Coating : Inside and outside shall be of dip coating process type with High proof Cross Linked Epoxy coating with minimum thickness 60 MICRONS (μm). EPOXY COATING SPECIFICATION AND TESTS Tar-Free Cross Linked Coating specification and tests requirement shall be according \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 59 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection to DIN EN 877 Section 5.7.2.3. Chemical Resistance requirement. The tests shall be carried out in accordance with EN ISO 2812-1 using standard panels complying with EN 605. These samples shall be immersed for 30 d in the following test liquids: - a solution of sulfuric acid at pH 2, for the first sample - a solution of sodium hydroxide at pH 12, for the second sample Both solutions shall be held at (23 ± 3) ºC. The pH shall be continuously monitored, and the solutions renewed as soon as the pH has changed by more than 0.3 from the initial value. At the end of the immersion period the samples shall be rinsed and examined for blistering, the acceptable degree being dimension 3, class 3 according to ISO 4628-2. In addition, a cross-cut test in accordance with EN ISO 2409 shall be carried out, in accordance with 5.7.2.5 and the result shall meet level 1 of EN ISO 2409. 8. COUPLINGS – PROGRAMME Stainless Steel Coupling with Single Bolt Screw and EPDM Rubber Sealing shall be used for connecting both Cast Iron Hubless Pipe and Fittings. All Couplings shall be of Electrical Continuity type. Electrical Continuity Test Report shall be provided. The coupling shall be of Dukorapid Coupling type. 9. ENVIRONMENTALLY FRIENDLY PRODUCTS All Cast Iron Pipe/Fitting shall be of Environmentally Friendly products that are certified by an approved local certification body to complement Green building Scheme. 10. SAMPLES OF HUBLESS PIPE/FITTING/COUPLING Samples of Hubless Pipe/Fitting/Coupling are to be submitted for approval prior to the installation. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 60 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 8.0 PIPEWORK INSULATION 8.1 GENERAL All insulating materials shall be delivered to site in a dry condition and be housed in a dry store until drawn up for use. All insulation, adhesives, vapour barriers and coatings shall be non-combustible and have the following Fire Hazard Property Indices (as defined in AS 1530 and AS A30): Ignitability Spread of Flame Heat Evolved Smoke Developed 0 0 0 not greater than 3 All material and adhesives used shall conform to local authority’s requirements. All equipment and materials used shall be fire retardant and shall comply with the requirement of the Local Fire Services Department. Thermal conductivity factors shall be as defined by ASTM C518, and are quoted at 24°C. Insulation shall have non-corrosive properties wet or dry and shall not cause corrosion to the surface with which it is in contact. In particular, phenolic foam insulation shall not be used in conjunction with copper pipe work. Insulating material shall be resistant to the attack of bacteria and algae. It shall not contain substances that will support vermin or the growth of moulds and fungi. The following materials shall not be used - uncontained or non-stabilised mineral fibres, asbestos, polystyrene. 8.1.1 METHOD OF ATTACHMENT / JOINT Prior to application of insulating material, all surfaces shall be thoroughly cleaned to remove scale, grease, oil, dirt and any other foreign matter. Piping shall be wire brush cleaned and then painted with primer as described elsewhere in this specification. No piping insulation shall be applied over pipe joints until pressure testing of the respective portion of the installation is complete. Irrespective of the method of attachment, all thermal insulating materials shall be in close contact with the surfaces to which they are applied. Edges and ends of sections of insulation shall be arranged to butt up close to one another over the whole insulated surface. Edges or ends of sections shall be cut or shaped at site where necessary. Preformed sections shall be cut and/or mitres on site as appropriately to ensure tight fit at bends. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 61 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Joints in insulation shall be properly sealed. Each joint shall have butt ends sealed with a vapour seal to prevent water transmission along the pipe. The longitudinal lap joint shall be placed at the underside of the pipe. All fittings shall be insulated to the equivalent thickness of piping insulation with all sectional pipe insulation ends and fittings sealed with a suitable vapour barrier before application of fitting insulation. The external finish is to be as for the piping. Valves, pumps and strainers and other pipe fittings shall be neatly boxed-in using sectional insulation. The external surface for the boxing shall be as specified for the piping. Insulation shall be trimmed around the top of the valves leaving the gland exposed for inspection and repacking. Detachable sheathing boxes shall be provided on pumps, strainers, valves and water boxes in plantroom areas. Flanges shall have bodies packed solid with fiberglass wool before section insulation of the correct diameter is placed across the flanges. The external finish is to be as for the piping. All pipes located in plant rooms or that exposed to view shall be enclosed in factory prefabricated galvanised sheet casings in addition to vapour barrier. The casing shall be not less than 0.8mm thick for pipework of 150mm and above measured over the insulation and not less than 0.6mm thick on smaller pipe work. All pipes exposed to weather shall be galvanised jacketing as specified above if insulated and to be painted with weatherproof paint. At the point of support, specially prepared blocks of high density polyurethane foam material shall be positioned to ensure the integrity of the vapour barrier by bonding the supports to the insulation. No insulation shall be applied until pipes and plant have been tested as specified. 8.1.2 METAL SHEATING Insulated pipes and fittings in plant rooms, store rooms, pipe channels and other exposed areas shall be sheathed with 0.5mm thick zinc anneal, to prevent physical damage due to impact. Electrical bonding shall be provided for all metal clad pipe work. 8.1.3 VAPOUR BARRIER A guaranteed effective vapour barrier shall be installed over all insulation, except insulation whose vapour resistance factor µ is greater than 1000 (see table below). The vapour barrier shall consist of a layer of fibre reinforced aluminium foil laminate, minimum 0.5mm thick, with a Water Vapour Transmission Rate of not greater than 0.004g/m2 per 24 hours. (erg. Sisalation 450). The vapour barrier shall be applied directly over the insulation with all joints sealed with 75mm wide pressure sensitive reinforced tape. Where possible, the vapour barrier should be factory applied to the insulation prior to delivery to site. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 62 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Extreme care shall be taken to provide an effective vapour seal at each and every pipe support. 8.1.4 INSULATION MATERIALS Insulation materials shall be in accordance with the following table: 8.1.5 Ref: A B C Description: Nitrile Rubber (Class1 - Armaflex) Rigid polyurethane foam Rockwool Blanket Density: (kg/m3) Thermal Conductivity (k-value) (W/m°°K) Water vapour Permeability Resistance Factor(µ µ) 90 45 0.04 0.02 100 0.04 >1000 >1000 N/A(<1000) SCHEDULE OF INSULATION FOR PIPED SERVICES Pipe work and fittings shall be insulated in accordance with the following table: Service Hot water (up to 80°C) Exhaust diesel pump complete with insulation and aluminium jacketing Material type (refer to table above) A C Nominal thickness(mm) 25 100 \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 63 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 9.0 SANITARY SYSTEM - PLUMBING SERVICES 9.1 GENERAL A complete sanitary and drainage piping system shall be supplied and installed in accordance with the drawings, the latest requirements of the Local Authorities and the requirements described herein under. All materials such as pipes and fittings, floor traps, jointing materials and components used in the work for sanitary plumbing installation shall be of the type, size, brand, quality and workmanship approved or accepted by the Local Authorities. The Licensed plumber shall be solely responsible for the satisfaction and approval of the Local Authorities until acceptance or handing over of the whole drainage system. 9.2 SANITARY DRAINAGE INSTALLATION 9.2.1 PIPE SUPPORTS All pipe work shall be fixed at least 50 mm away from the finished surface of the supporting structure. All fixing, hangers, holder bats, brackets, etc., shall be of mild steel and shall be given the same finish as the piping. Vertical pipes shall be parallel to walls or column lines and shall be straight and plumb. Horizontal pipes shall be graded in the direction of flow as required. Fixings shall be cast in the building structure. If this is not practicable they shall be secured to the structure by means of approved fasteners. Cement grouting or wood fixings shall not be permitted. Soil waste or vent pipes shall be clamped or fixed using split ring or clevis type hangers and clamps. Where applicable, clamps sh all be tight against the pipe collar. Where it is necessary to avoid sound transmission, a PVC insert shall be provided between the fixing and the pipe. 9.2.2 VENT PIPES AND STACKS Each vent pipe shall be constructed upwards individually or be connected to a main vent stack. The top end of the vent pipe or main vent stack shall either terminate as high as the discharge stack or connect to the discharge stack at a point not less than 150 mm above the top of the highest soil sanitary appliance or floor trap. The lower end of each vent stack shall be connected to the discharge stack at a point not less than 225 mm and not more than 750 mm below the entry of the lowest connection to the discharge stack. The low end of all vertical lines of vent pipes shall be connected full size at not less than 45 degree angle to the horizontal. All offsets shall be at a grade of not less than 45 degree angle to the horizontal. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 64 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 9.2.3 TERMINATION OF DISCHARGE AND VENT STACK The top end of each discharge or vent stack shall project not less than 450 mm above the eaves of a sloping roof or 150 mm above a flat roof without a parapet, or in the case of a flat roof with a parapet to the height of parapet above the roof. If the roof is used for any purpose other than as a covering to the building, the discharge or vent stack shall be extended at least 2.5 m above the roof level. Proper lead over-flashing shall be installed. The top end of a discharge or vent stack above the roof shall be at least 3 m away from any window or opening of adjoining buildings in the horizontal direction. The end of a discharge or vent stack above the roof shall be fitted with galvanised wire dome gratings on to the spigot top-most end of the pipes. Pipes that protrude through walls, floors or roofs shall be made water-tight. 9.2.4 CLEANING EYES AND INSPECTION OPENINGS Inspection and cleaning eyes shall be provided on all soil, waste or soil and waste pipes so as to provide access for the proper inspection and cleaning of the entire length of the pipe. 9.2.5 TRAPS All inlets into a discharge pipe or discharge stack shall be properly trapped to prevent the entry of foul air from the drainage system into the building. Traps for soil sanitary appliances and floor traps shall have a water seal of not less than 50 mm. Traps with outlets of less than 75 mm diameter shall have a water seal of no less than 75 mm. Floor traps shall be cast iron of internal dimensions 150 mm x 75 mm outgoing pipes, complete with an approved 150 mm circular stainless steel or bronze grating with hinged cover and hopper inlet connection. The traps shall be installed with 75 mm diameter outlet complete with inspection eye. Any riser to a floor trap shall be of the same size as the opening of the trap and the height of a riser from the top of the grating to the bottom of the trap shall not exceed 600 mm. All gully traps shall be of internal dimensions 150 mm x 100 mm and provided with a grating or cover, constructed of stainless steel or bronze, and bolted down. Outgoing pipes and shall be of heavy duty cast iron free from sand holes and cracks and complete with cast iron removable grating. The grating or cover surface level of floor traps and floor wastes shall match the surrounding floor level. All traps shall be accessible and designed to facilitate cleaning. 9.2.6 PIPE GRADIENTS Pipe gradient for all horizontal sanitary piping shall be of 1 : 100. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 65 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 9.3 WATER PUMPS 9.3.1 GENERAL The pump heads given in the schedule are guidance during tendering only, and the Contractor shall be responsible for the checking the total final resistances of each system, based on the actual pipe runs and equipment offered, prior to ordering. The calculation shall be submitted to the Engineer for approval. Any modifications to the system or any of its components, i.e. pumps, pipe work, motors, cables switchgear etc. which may be required to meet the scheduled duties and space limitation shall be carried out at the Contractor’s expense. Scheduled pump duties are for estimating purposes only. Final assessment of system head shall suit the actual equipment selected. Pumps shall be selected such that the design duty point is within 5% of the maximum efficiency point. The pump casing shall be selected such that it is capable of taking an impeller one size larger than that selected. Pump speeds shall not exceed 1500 rpm and the efficiency should be minimum 60 %, unless otherwise approved by the Project Manager. All pumps and motors shall be of minimum vibration and noise level during operation. Appropriate neoprene vibration isolation mountings, or other anti-vibration mounts shall be provided as necessary for each pump set. Facilities shall be provided to prevent starting of pumps when the water tank is at low water level. An indicator for this low water level alarm shall be provided. Facilities to select which pump to be duty pump and standby pump shall be provided and be interchangeable. Leakage from pump gland shall be drained to the nearest floor waste. Pump curves for all pumps offered shall be submitted. Any curve indicating excessive shutoff head will not be accepted. Each pump shall be provided with a gate valve at suction and discharge, approved check valve at discharge, approved strainer at suction, flexible connections at pump suction and discharge, eccentric reducer at suction, concentric reducer at discharge, pressure gauges at suction and discharge, circulation relief valve and automatic air relief valve. Appropriate spring vibration isolation mountings shall be provided for each pump sets. All pumps shall be installed on concrete foundation bases (inertial block). Alignment of pump and driver shall be carried out by competent specialists before any attempt to start-up is made. The Contractor shall provide and install two control panels each pump (duty and stand by), on 16 SWG drip-proof metal chambers covering the control switchgear for each pumping installation. And the two panels connect to each other to call the pump (duty and stand by). \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 66 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection All pumps, drives and accessories shall be of the highest commercial standard and shall be designed, constructed, rated and tested in accordance with BS 559, Hydraulic Institute Standards of the USA, latest edition. 9.3.2 AUTOMATIC PRESSURE BOOSTER PUMP SETS Packaged pump sets shall be provided to allow for automatic operation, single and parallel alternate type (1 duty and 1 standby) with variable speed drive. The system operation shall be such that the initial water demand shall be met by the charged diaphragm pressure vessel. Should the water demand continue, the system pressure shall drop until to a pre-set pump "cut-in" point is reached which shall cause the lead pump to start operation. Should the lead pump be unable to maintain the system pressure due to increased water demand, the second pump shall start operation. At peak demand, all pumps will operate. Similarly, if the water demand drops, the standby pump shall stop operation first followed by the others sequentially. An adjustable minimum run time shall be provided for each pump to prevent any short cycling of the pumps. The closed diaphragm pressure vessel shall be of polyethylene material, fitted with a pressure gauge and isolating valve. The interior shall be of non-toxic lining suitable for potable water. The vessel shall be manufactured to conform to ASME pressure vessel code standards. The Contractor shall provide and install two control panels each pump (duty and stand by) And the two panels connect to each other to call the pump (duty and stand by). 9.3.3 SUMP PUMPS/SANITARY PUMPS/STORAGE WATER PUMPS/ MOVEABLE SUMP PUMPS Sump pumps shall be encapsulated fully submersible type and full stainless steel pump type. Pumps with spiral casing shall be of stainless steel and shall be complete with inlet strainer, cable gland, Impeller shall be of stainless steel and replaceable stainlees steel wear ring. The pump shall be designed to work entirely or partly submerged in water. The pump shall be capable of handling water containing relatively abrasive solutions and shall be pedestal type. The pump shall be able to operate continuously at its rated output regardless of whether the ejector water is above or below the water surface. The motor shall be housed within the pump casing and shall be sealed from the pump chamber by a double mechanical seal. The mechanical seal shall be of tungsten carbide. Motor starters for non-submersible usage shall be insulated against moisture and heat to a minimum of Class "F". Motor starters for submersible type shall be of Class "H". The shaft shall be of stainless steel and shall be integral with the pump impeller. Sump pumps above 2 kW shall be provided with over temperature protection in the stator windings and shall be 3 phase. All submersible pumps installed in the wet pump sump shall have integral an automatic hydraulically operated flush valve. The flush valve shall be of cast iron construction and \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 67 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection mounted on a special boss of adequate thickness cast integrally on the pump housing near the discharge outlet. During each pumping cycle, the flush valve shall operate to flush and clean the pump sump of sludge and sedimentation by thoroughly mixing the water automatically before discharge. The action shall ensure the sump to be clean and minimise maintenance. Each pump shall be capable of delivering not less than the quantity of fluid against the design head as indicated in the drawings. Each pump shall be capable of handling a dry suction condition for a reasonable period without harm. Among others, the following fittings shall be required for the pump installation: a) b) c) d) e) f) Gate valve at discharge. Check valve at discharge. Flexible connection at discharge. Float or level electrode control. Quick discharge connection (QDC). 2 Control Panel, chain Where single sump pump installations are shown in the drawings, they shall be automatically and sequentially controlled, started and stopped. The automatic sequential operation system shall be activated by means of multi-electrode sensors similar to "National", "OMRON" type or approved equivalent. In addition, a klaxon or siren alarm shall be provided for when the last (or standby) pump is activated or failed to activate. They shall be provided with duty selector for alternating the duty pump selection. All starter and control panels shall be constructed to conform to the requirements as specified elsewhere in this specification. Connections to the sump pumps shall be in flexible butyl rubber or EPR insulated cables of sufficient rating. Where the cables are exposed, they shall be suitably protected in steel conduit. All joints shall be sealed water-tight and made corrosion-proof. All control panel The Contractor shall provide and install two control panels each pump (duty and stand by) And the two panels connect to each other to call the pump (duty and stand by). All electrical works, including starters and control panels shall comply with the requirements set out elsewhere in this specification. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 68 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 9.3.4 VERTICAL MULTI-STAGE PUMPS Multi-stage pumps shall be centrifugal type and arranged with vertical shafts. The pump casings shall be closed-grained cast iron to BS 1452 grade 260, accurately machined and assembled with metal-to-metal joints. The impellers shall be of zinc free bronze to BS 1400 PBI, mechanically balanced and keyed to shaft. Renewable guide rings are to be provided in the casting, keyed to prevent rotation. Pumps shall be driven by elevated in-line TEFC squirrel cage motors via extended vertical shafted complete with universal couplings. The shafts shall be stainless steel grade 316. Stainless steel 304 sleeves shall be provided to protect the shaft in the water space and through the sealing glands. The sleeves shall be keyed to prevent rotation and secured against axial movement. The bearings shall be of ball or roller type protected against ingress of water, dirt and other matter. The Contractor shall provide and install two control panels each pump (duty and stand by) And the two panels connect to each other to call the pump (duty and stand by). 9.3.5 HORIZONTAL MULTI-STAGE PUMPS Multi-stage pumps shall be horizontal radially split section pump, single flow, multistage. Casing shall seal by flats gasket and held together by tie bolts. The stage casting and the tie bolts are encased in a steel cladding. Bearing shall locate in two bearing housings and adjusted at both sides of the pump. Shaft seal fitted with renewal protecting sleeves in the region of the shaft seals. The uncooled packing stuffing box can be used for operating temperatures up to 106ºC; above the figure, a cooled packing stuff box shall be use, in which to supply of cooling water ensures that the temperature is kept within of stuffing boxes or mechanical seal. Driver shall be direct coupled electric motor using a flexible coupling. Rotation shall be clock wise. All control panel The Contractor shall provide and install two control panels each pump (duty and stand by) And the two panels connect to each other to call the pump (duty and stand by). 9.3.6 CONTROL OF DUTY / STANDBY PUMPS Operation of the duty and standby pumps shall be carried out by the following method: a) b) Automatically by means of pressure sensor (i.e. pressure switches); Manually by means of a local start/stop push buttons on pump local motor control panel and emergency stop switch. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 69 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection The pressure switch shall be installed next to the manual release valve. When the pressure drops to the pre-determined level, a signal will be sent to the pump local motor control panel to start the pump. Automatic controls shall be operated by electronic, float less type level switches. 9.4 WATER STORAGE TANKS 9.4.1 GENERAL Water storage tanks shall be either concrete tanks constructed by the builder, or sheet metal with epoxy coating (for firefighting system or combine firefighting and plumbing) / fibreglass reinforced polyester (FRP) tanks (for plumbing) supplied and erected by the Contractor, or as indicated on the drawings. 9.4.2 DESCRIPTION Each tank compartment shall be provided with the following (or as shown on the drawing): • • • • • • • • • • Flanged connection for make-up inlet, outlet, drain, overflow and balancing pipe complete with isolation valve. Inlet ball float valve. Water level indicator and air vent with mosquito-proof betting. Float less level switches for high and low water level alarm. Isolation valves shall be provided at all make-up, draw-off and drain points. Water level control switches (electromagnetic floatless type) including high and low level alarms. Air vent with mosquito proof netting. Water level indicator. Manhole and manhole over. Ladder and platform inside and the tank. A stainless steel 316 cat ladder shall be provided inside and outside of each compartment supplied and installed by the contractor. Size of ladders shall be 400 mm wide with 40 mm diameter stiles and 25 mm diameter rungs at 250 mm centres. 9.4.3 WATER LEVEL CONTROL SWITCHES The Contractor shall supply and install electromagnetic floatless type water level control switches in the following locations: · · · · · · High level alarm (over-flow) Pump stops (high level) First pump start (Second pump start – if parallel operation) Low level cut-out of booster pumps Earthing probe \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 70 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Each probe shall be of the correct length for the particular application and tank location. Electrodes shall be of polished stainless steel 20 mm OD. Electrode holders shall be weatherproof in all respect. The earthing probes shall be connected and wired to the building earth systems of the building. Each set of electrodes shall be installed inside a 230 mm diameter PVC pipe acting as a wave barrier. The level switch set shall operate with a stepped down voltage at 24V maximum. Stepped down transformers shall be provided for each set of control probes and shall be installed inside centralised control cubicles inside pump room. Mechanical steel stuffing boxes shall be used. 9.5 WATER TREATMENT PLANT INSTALLATION 9.5.1 GENERAL The Contractor shall be responsible for their own design. This document is a performance Specification. The intent of the Specification is to allow for competitive Tenders from a number of specialist contractors allowing them to provide their equipment which will treat the raw water and produce treated water complying in all respects as detailed elsewhere in the Specification. Tenderers shall submit offers based upon a proven process providing the performance requirements and guarantees are respected. Only packages of a modular nature which are easily accessible and maintainable with local materials should be submitted. Alternative offers should be accompanied by design notes, details, manufacture's catalogues and literature and cost. The Specification prescribes certain limits and refers to certain guidelines. The Contractor shall have regard to such limits and guidelines but shall depart from them to the extent necessary to ensure that the specified treated water conditions and the guarantees provided are met. Any departure from the limits and guidelines given should be specified and justified in his Tender. The Contractor shall coordinate with the Project Manager to ensure that the plant arrangement fits within the space allocation consistent with good maintenance access to all plant and equipment. The Tenderer should submit with the Tender a sketch demonstrating that the Tenderer's selected plant and equipment will fit into the space allocation. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 71 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 9.5.2 SYSTEM COMPONENTS The water treatment plant should include, but not be limited to, the following components: Clean Water Treatment • Sand Filtration • Carbon Filtration • Disinfection Dosing by Chlorine The system must also include all associated pumps, values, fittings and controls to provide a complete working system. 9.6 WATER SUPPLY 9.6.1 WATER SOURCE Water on site shall be sourced from the PDAM and backed-up a local connection or water truck feiling point. 9.6.2 QUALITY OF WATER INCOMING WATER SUPPLY The Contractor shall confirm the quality of the incoming water sources in other to confirm design and sizing of required water treatment systems. 9.7 TREATED WATER 9.7.1 TREATED WATER PRODUCTION CAPACITIES The equipment shall be sized to produce scheduled net water quantity after allowance for washwater and in-plant water usage. Operation of the plant at constant throughput is the preferred mode of operation. The rate of change to the treatment plant output shall be unlimited for reductions in flow. The rate of increase shall be constant until full operating capacity is achieved. 9.7.2 TREATED WATER QUALITY The treatment plant shall be designed to produce treated water to comply with the specified water quality values described in the table below and all other water quality values listed in PERMENKES 492 tahun 2010 Tentang Persyaratan Kualitas Air Minum. The 'Target Parameter Value' is listed in the column “Maksimum yang dianjurkan” and the 'Not to Exceed Parameter Value' is listed in the column 'Maksimum yang diperbolehkan'. The water quality targets and frequency of sampling water leaving the plant shall be: Water Quality Parameters Turbidity Unit Silica Target Parameter Value Not to Exceed Parameter Value Standard Standar Indonesia Normal Sampling Frequency Continuous \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 72 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Water Quality Parameters Unit True Colour Pt - Co Total iron ppm Target Parameter Value Not to Exceed Parameter Value Indonesia Maksimum yang dianjurkan Maksimum yang Diperbolehkan Normal Sampling Frequency 2 samples / day 1 sample / day < 0.3ppm Manganese ppm Aluminium Residual mg / L Chlorine mg / L 1 sample / day < 0.3ppm 1 sample / day +/-0.2 mg/L of the set point T.D.S ppm pH units +/-0.2 mg/L of the set point 4 samples / day 6.5 to 9.2 2 samples / day zero 1 sample / day zero 1 sample / day <200ppm 7.0 to 8.5 Faecal Coliforms No./100ml zero Total Coliforms No./100ml zero 1 sample / day Taste and Odour Not objectionable 9.7.3 WATER TESTING Test methods for samples shall be in accordance with ‘Standard Methods’. The chlorine set point will be set by the Owner at between 1.0 mg/L and 2.5 mg/L. The treated water quality shall meet the target value on at least the percentage below of samples for discrete sampling or percentage of time for continuous sampling or measurement stated below. If samples fail to meet the target quality the sampling frequency shall be doubled. No more than two consecutive samples shall exceed the target value. Raw Water Quality Average Maximum Percentage Compliance 95% 90% The treated water shall comply with the specified 'Not to Exceed Parameter Value' 100% of the time and for 100% of the samples. Testing of the raw and treated water is to be undertaken at the laboratory located within the central services site. The Contractor shall keep and submit all testing records, including any records of samples that did not meet the required standard, to the Project Manager on a weekly basis. Additional \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 73 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection to the frequency of testing detailed above, the Contractor is to carry out a full testing program at the 'Test before Taking Over' and 'Operation Test' phases. 9.7.4 DELIVERY POINT OF TREATED WATER The delivery point for measurement of treated water production shall be at the outlet of the plant process and prior to the treated/clean water storage tank. 9.8 MISCELLANEOUS SYSTEMS 9.8.1 CHEMICAL DOSING SYSTEM Chemical dosing system shall be design, supplied, installed and commissioned by the water treatment specialist contractor under this contract. The Contractor shall guarantee his coagulant chemical usage will be within ±5% of the predicted dosage based on jar tests. All dosing pumps sets shall comprise duty and standby pumps. Chemical dosing system shall be provided with the automatic control system. 9.9 TESTING OF WTP 9.9.1 GENERAL All items of plant including the WTP control panel are to be tested at site as provided for under the appropriate internationally recognized standards related to the manufacture of that item. Results of all tests are to be supplied to the Project Manager. 9.9.2 TEST AND DISINFECTION BEFORE TAKING OVER The completed fully commissioned water treatment plant is to be subjected to a continuous 48-hour test monitored by the Project Manager and/or relevant Authorities' Representative, with the collection of all data deemed necessary. After completion of tests, tanks are to be flushed and cleaned if system is not to be put in the normal operation immediately. Upon the completion of the entire installation, the Contractor shall liaise with the other Contractors to sweep, mop and clean the water tanks and flush clean pump sets, distribution pipelines and pumping mains as required, taking due care that openings which connect to pipelines are properly plugged up and foreign matter prevented from entering. The water storage tanks shall then be filled with water mixed sufficient decanted solution of chloride of lime to give a concentration of 40ppm of free chlorine in the water. The tanks shall be filled with water containing 40ppm of free chlorine as many times as necessary until they are full. The chlorine water shall be left in the storage tanks and pipework overnight and drained out completely the next day. The water supply system shall then be put into-operation. No workmen shall be permitted to enter the tanks after chlorine water has been admitted, the compliance with which shall be the Contractor's sole responsibility. Should he be negligent in \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 74 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection this matter, in the opinion of the Project Manager, he shall repeat the disinfection process until the Project Manager is satisfied, and at no extra cost, charges, expenses, etc. to the Contract. Only workmen who have been examined and certified by the Government Health Authority to be non-carries of water-borne diseases shall be employed in the disinfection process. 9.9.3 OPERATION TEST After the plant has been used for 90 days, a final 48-hour continuous test is to be carried out, monitored by the Project Manager, and the plant adjusted to optimum operational efficiency. After completion of tests, tanks are to be flushed and cleaned if system is not to be put in the normal operation immediately. 9.9.4 HANDING OVER The Taking Over Certificate will be issued in accordance with the Contract Clauses after completion of the tests before taking over, described in "Test before Taking Over". 9.9.5 ADDITIONAL INFORMATION TO BE INCLUDED WITH TENDER In addition to the information required to be returned with Tender as described in the Specification, the Contractor is to include in his Tender the following additional information: • Monthly power consumption of the WTP under normal working conditions. • The types of chemicals that will be added to the WTP process under normal working conditions, and the expected monthly requirement for each chemical. • The Contractor is to provide details of all safety features to be included in his plant e.g. chlorine leak detectors, self-contained air breathing apparatus, safety shower and eyebath, etc. 9.10 SEWAGE TREATMENT PLANT 9.10.1 DESIGN PARAMETERS The Contractor shall be responsible for their own design. The design parameters listed below are considered to represent good practice and should be used by Tenderers for guidance and to establish minimum requirements. Where parameters proposed by Tenderers are such that they provide a lesser assurance of meeting effluent quality requirements than those parameters listed, supporting evidence justifying the use of the alternate parameters should be provided by the Tenderer with his Tender. Average Daily Flow (ADF) Peak Daily Flow (PDF) Equalization tank Fixed bed cascade as shown on the drawing 3 times the ADF Sized to suit Sized to suit \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 75 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Sludge Storage: one week in separate tank; aerated. 0.5 mg/L free residual after 30 minutes detention at 3 ADF. Sized to suit Ultra filtration Chlorination: Recycling Tank: Filtration: 9.10.2 INFLUENT (RAW SEWAGE) The raw sewage to be treated will be predominantly domestic sewage. It is to be expected that the sewage will contain matter such as rags, lint, plastics, rubber, sticks, grit and other such gross materials. The typical average composition of the raw sewage is expected to be similar to that listed below, however Tenderers should provide for a plant which will cope with raw sewage of a composition which differs from the listed figures by margins which could be reasonably anticipated by a competent manufacturer. Biological Oxygen Demand Chemical Oxygen Demand Suspended Solids Total Nitrogen Total Phosphorus 9.10.3 (BOD) (COD) (SS) (N) (P) 350 mg/L 500 mg/L 200 mg/L 40 mg/L 8 mg/L EFFLUENT QUALITY (TREATED SEWAGE) Domestic Effluent Quality Standard Parameter Unit Communal pH KMnO4 TSS Ammoniac Fat and Oil COD BOD Mg/L Mg/L Mg/L Mg/L Mg/L Mg/L Mg/L 6-9 85 50 10 20 80 50 The plant shall provide an effluent which meets the following parameters on a ninety (90) percent basis. After treatment: Biological Oxygen Demand (BOD5) Suspended Solids (SS) Turbidity Dissolved Oxygen (DO) Total Nitrogen (N) < 10 mg/L < 15 mg/L ≤ 2 NTU ≥ 2 mg/L ≤ 5 mg/L \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 76 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Total Phosphorus (P) pH Chlorine (Free) Total Coliforms Grease and Oil ≤ 1 mg/L 6.5 - 8.0 < 0.5 mg/L < 10 orgs/100 mL < 10 mg/L The effluent shall be put further treated using ultra filter recycling system and stored in the recycling/flushing water tank for use as make up supply to cooling towersor for irrigation. Overflow from the recycling / flushing tank shall discharge to the City Drainage. 9.10.4 FREQUENCY OF EFFLUENT TESTING The frequency of effluent testing shall be as detailed below; Biological Oxygen Demand (BOD5) Suspended Solids(SS) Turbidity Dissolved Oxygen(DO) Total Nitrogen (N) Total Phosphorus(P) pH Chlorine (Free) Total Coliforms Grease and Oil Monthly /as required Monthly /as required Continuous Monthly /as required Monthly /as required Monthly /as required Monthly /as required Monthly /as required Monthly /as required Monthly Where the value determined by analysis is below the detection limit, the value must be taken as the detection limit. Testing of the effluent is to be undertaken at the laboratory located within the central services site. The Contractor shall keep and submit all testing records, including any records of samples that did not meet the required standard, to the Project Manager on a weekly basis. Additional to the frequency of effluent testing detailed above, the Contractor is to carry out a full testing program at the ‘Test before Taking Over’ and ‘Operation Test’ phases. The Contractor is also to forward effluent samples to a laboratory in Jakarta, to be nominated by the Project Manager, at the ‘Test before Taking Over’ and ‘Operation Test’ stages and quarterly during the maintenance period. The Contractor will be responsible for the cost of transportation of the samples to Jakarta and the cost of the effluent testing. 9.10.5 LABORATORY EQUIPMENT The Contractor is to provide all laboratories testing equipment suited to the day to day requirements necessary to control the operation of the system. The equipment is to enable a complete physical, chemical and bacteriological analysis of raw sewage and treated sewage to be performed. The Owner will provide the building to house the laboratory equipment. The building will be within the central services area. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 77 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection The Contractor is to provide with his tender a list of all laboratory testing equipment proposed and their associated cost to supply, install and calibrate. The Contractor shall provide details of the calibration certification of each piece of equipment. The Tenderer shall, with his returned Tender, detail the size of laboratory building required and the arrangement of the laboratory equipment within the building. 9.10.6 FUNCTIONAL PLANT DESIGN The treatment plant, being an activated sludge plant operating in the fixed bed cascade mode, shall incorporate the following process elements: • • • • • Solids disintegration Continuous aeration with sedimentation Biological nitrogen removal Chemical coagulation for phosphorus removal Filtration Sludge will be pumped at regular intervals from the process units and carted from site for disposal. Any alternative proposal offered by the tenderers shall include these processes or equivalent processes as a minimum requirement. 9.10.7 TYPICAL REQUIREMENTS The plant shall be a modular design and fully automatic with ease of access to equipment and ease of maintenance. System shall be design by the specialist supplier based on the following criteria: Water flow rate: BOD loading: Effluent BOD level: as shown on the drawing as shown on the drawing less than 50 mg/l Plant shall include required influent pre-treatment (grease trap, automatic spiral screen, etc.), sludge tank, equalization tanks, equalization pumps, air blowers, bio detox tanks, polishing system tanks, chlorination system, chlorination tanks, effluent tanks, effluent pumps, treated water tanks, recycled water treatment system, recycled water tanks and control system complete with all necessary accessories or as its standar system. 9.11 WATERMETER Water meter 15-40mm specification General: a device to measure clean water consumption volume in meter cubic. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 78 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Fluid Material Design Standard reference Operating flow rate Starting flow rate W a t e Accuracy r Indicator m e t Max operating pressure e Max operating temperature r Environment protection Installation 5 Body length 0 1 5 Connection 0 Communication m m Clean or potable water Brass or bronze body with sufficient powder / epoxy coating, plastic chamber and turbine with metallic pivot, glass register copper can with plastic cover, or stainlesssteel sensor for electronic Multi-jet / single-jet / volumetric, mechanical or electronic with minimum 10 years battery SNI 2547:2008 for mechanical, or MID 2014/32/UE and OIML R49 for electronic ½” (15mm) : 32 – 3,000 l/h ¾” (20mm) : 50 – 5,000 l/h 1” (25mm) : 80 – 7,000 l/h 1.5” (40mm) : 200 – 20,000 l/h ½” (15mm) : max 10 l/h ¾” (20mm) : max 12 l/h 1” (25mm) : max 25 l/h 1.5” (40mm) : max 70 l/h Minimum ratio R50, ± 5% between Q1 to Q2 and ± 2% between Q2 to Q4 Analogue mechanical drum or LCD, 4 or 5 or 6 digits for meter cubic and 1 or 2 decimals, up to 9,999.99 or 999,999.9 16 bar or higher Up to 50° C IP68, anti-magnet up to 2,500 gauss In-line with pipe, horizontal or vertical ½” (15mm) : 165mm ¾” (20mm) : 190mm 1” (25mm) : 260mm 1.5” (40mm) : 300mm Thread PN10 Ready for AMR (Automatic Meter Reading) or connection to BAS (Building Automation System) with wired or wireless module attachment (Cyble or equivalent), without dismantling the unit from installation Every unit must be sealed, tested and certified by Metrology body in Indonesia s Test result document p e cification General: a device to measure clean water consumption volume in meter cubic. Fluid Material Design Clean or potable water Brass or bronze or cast-iron body with sufficient powder / epoxy coating, plastic chamber and turbine with metallic pivot, glass register copper can with plastic cover, or stainless-steel sensor for electronic Woltmann / single-jet / volumetric, mechanical or \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 79 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Fluid Standard reference Operating flow rate Starting flow rate Accuracy Indicator Max operating pressure Max operating temperature Environment protection Installation Body length Connection Communication Test result document Clean or potable water electronic with minimum 10 years battery SNI 2547:2008 for 50mm mechanical; ISO 4064 and MID 2014/32/UE and OIML R49 for 65-150mm 2” (50mm) : 0.35 – 50 m3/h 2.5” (65mm) : 0.5 – 79 m3/h 3” (80mm) : 0.75 – 120 m3/h 4” (100mm) : 0.9 – 200 m3/h 6” (150mm) : 1 – 500 m3/h 2” (50mm) : 0.19 m3/h 2.5” (65mm) : 0.22 m3/h 3” (80mm) : 0.25 m3/h 4” (100mm) : 0.38 m3/h 6” (150mm) : 0.4 m3/h Minimum ratio R50, ± 5% between Q1 to Q2 and ± 2% between Q2 to Q4 Analogue mechanical drum or LCD, 6 or 7 digits for meter cubic and 1 or 2 decimals, up to 999,999.99 or 9,999,999.9 20 bar or higher Up to 50° C IP68 In-line with pipe, horizontal or vertical 2” (50mm) : 200 mm 2.5” (65mm) : 200 mm 3” (80mm) : 200 mm 4” (100mm) : 250 mm 6” (150mm) : 300 mm Flange PN10 or PN16 Ready for AMR (Automatic Meter Reading) or connection to BAS (Building Automation System) with wired or wireless module attachment (Cyble or equivalent), without dismantling the unit from installation Every unit must be sealed, tested and certified by Metrology body in Indonesia \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 80 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 10.0 AUTOMATIC CONTROL SYSTEMS This section of the specification applies to automatic controls for the mechanical plant and systems included in the contract, and sets out requirements pertaining to materials, installation and performance of these controls. Specification indicates design intent of the system operation and control equipment deemed to be required. It not intended to restrict suppliers from offering their components. Control systems shall be designed, supplied, installed and commissioned by specialist trade contractor competent in this type of work capable of providing local support for ongoing maintenance and back-up for all control system components. 10.1 CONTROL SYSTEM REQUIREMENTS 10.1.1 GENERAL REQUIREMENTS The contractor shall supply, install and adjust automatic controls as specified and as necessary for the satisfactory operation of all the mechanical plant and systems shown on the drawings and described in this specification. Automatic control systems shall include all control devices shown on the drawings, specified or otherwise necessary to perform the specified functions. Design drawings show intended location of the controlled equipment, services reticulation and location of control sensors. Contractor shall determine final location on site. Controls shall be selected for their respective duties in accordance with the recommendation of the manufacturer and shall have such operating tolerances as required to fulfil the guaranteed plant performance. Where requirements more onerous than the stated standards are specified within this document, the conditions of the specification shall take precedence. All control valves shall be sized for ‘line size’ as detailed on the plant schematic drawings. These figures shall be used for Tender purposes only. When engineered, all control valves/actuators shall be sized in accordance with the manufacturer’s recommendations, system flow rates, system pressures, etc. The Contractor shall obtain the various system flow rates, etc., for final sizing of control valves/actuators and damper actuators. The Contractor shall demonstrate all controls wiring to Project Manager and provide documentary evidence of the acceptance. The Contractor shall be responsible for correcting any wiring faults in the control wiring discovered during testing and commissioning at no additional cost to the contract. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 81 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection The Contractor shall be responsible for providing and installing all ‘head end’ wiring between the central file server and its associated display units, printers, etc. The Contractor shall ensure that all control instruments shall be so installed that there is adequate clearance for removal of any such item without dismantling any other item of equipment, and that all wiring connections can be visually inspected without removing the items. The Contractor shall ensure that all control equipment installed shall be so mounted that there is adequate clearance for removal of such equipment and also for normal testing, maintenance and inspection. The Contractor shall provide in accordance with an arranged panel production programme, all hardware and hardwire interface details to ensure full compliance with the specification. The Contractor shall be responsible for demonstrating the commissioned Control System in accordance with the specification and to the satisfaction of Project Manager. The Contractor shall return with his tender submission a method statement of how his works will be undertaken. Details of his quality assurance procedures regarding, in particular, software definitions and writing, production and testing, along with control panel, production, testing and installation, if applicable, should also be included. The Contractor shall be responsible for the supply and fixing of engraved Formica laminate labels to all items of control equipment in accordance with the reference numbers in the Schedules or as agreed. Where no flat surfaces are available on valves, the label shall be hung from brass chains. Control items in occupied areas other than plant rooms shall be marked internally. The Contractor shall ensure that the cable entry to control panels with ‘top’ entry shall be via the gland plate immediately above the required terminal or via the adjacent gland plate. Cabling entering the panel at one end and run inside the panel for termination at the other end will not be acceptable. The Contractor shall include the wiring back of all sensing devices associated with the Control System and also the transmission line cabling connecting MCP based outstations, floor based outstations and the operator’s station. The Contractor shall ensure that all detecting devices and control elements have final termination in flexible form which must be long enough to permit removal of the devices without disconnection. 10.2 SCOPE OF WORK The work covered by this section of the specification comprises the delivery of all material, labour, tools, software and hardware required to carry out the design, supply, installation, testing, commissioning, manufacturing and the defects liability services of the plant and equipment for the complete Control System including: \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 82 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection • • • • Control System Hardware including Field Terminal Units (FTU) and Field Processing Units (FPU) and associated equipment. Control Equipment including all field sensing devices, control valves, actuators, interfaces and control wiring and associated equipment. Central Control Equipment including file server and operator interface terminal, field notebook computer, report printer, alarm printer, Ethernet hub, network ancillaries and network wiring. Control System Software including programming of all control system devices. Other miscellaneous work shall include: • • • • • Painting and identification of all equipment as specified Provision of shop drawings Provision of as-built-drawings, commissioning manuals, operating and maintenance manuals Provision of training to the operation staff Warranty against defects for 12 months The following electrical work required for control systems is described in section ‘Electrical Work’ of this specification: • Mechanical services switchboards including the following items required on all switchboards for each controlled equipment item: i. Auto/Off/Test switch. ii. Green and red indication lights. iii. Lead/Lag/Remote control switch for standby/duty equipment. iv. Hours run meters. v. Green (open) and amber (close) for each smoke zone control motorised damper. vi. Other Switchboard items including: vii. Amber fire alarm indication lights. viii. Blue economy cycle lights. ix. Ammeter. x. kWh meters installation for energy recording and trading. xi. Integral controls for equipment excluding thermostats and interface to the control system where applicable. xii. Local indicating devices including annubars, pressure gauge, temperature gauge etc. xiii. All 240 Volt power cabling from mechanical electrical switchboards to motors, actuators, heaters etc. xiv. Motor speed drives and controllers. • • All control wiring. The Contractor shall provide and make all power cable connections from their equipment, local control panels, and switchboards to the electrical isolators or power points (including cable termination) provided by Electrical Contractor. Location of power supplyy isolators and power points shall be coordinated and agreed between the Contractor and the Electrical Contractor. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 83 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection • The Contractor shall provide On/Off remote control and status indication panel in FCC room including switches and indication lights for the following equipment and system: i). Fire pumps. ii). Sprinkler/Hydrant control valves. 10.3 CONTROL SYSTEM OPERATION 10.3.1 GENERAL Design and provide a control system and BMS which meets the control strategies as indicated on the control drawings but is designed by a specialist controls supplier. Provide the number of points as indicated in the points schedule, as may appear on the drawings or as required by the Specialist Control’s Supplier to meet the true intent of this Controls description. Mechanical control panels shall be provided complete with control switches, pilot lights (ON//AUTO/OFF/ALARM), isolating switches, time switches, motor starters and contactors, relays, fire services connections, labelling, etc. for each equipment item as described elsewhere in this document. 10.4 PLUMBING & SANITARY SERVICES 10.4.1 OPERATION OF SEWAGE TREATMENT PLANT Sewage treatment plant will be provided with independent control system which will operate: - Sewage compactor Air blowers Equalisation pumps Effluent pumps Chlorination system Filtration pumps Inflow motorised valves Sewage treatment plant control system will be interfaced with BAS to monitor common system alarms. 10.4.2 OPERATION OF WASTE/STORM WATER SUMP LIFTING SYSTEMS Waste/storm water sump lifting system shall include the following: • • Waste/storm water sump pumps Control sensors Waste/storm water sump lifting system shall pump water from the sump pit to the main water line. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 84 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Waste/storm water sump lifting system will be provided with independent control system interfaced with BAS. 10.4.3 WASTE/STORM WATER SUMP PUMPS Waste/storm water sump pumps shall be controlled as follows: 10.4.4 • Waste/storm water sump pumps will be provided with independent control system interfaced with BAS. Control system will be interfaced with sump pit water level float switches. • Lead waste/storm water sump pump will start when the sump pit “high water level” float switch is activated. Lead waste/storm water sump pump will stop when the sump pit “low water level” float switch is activated. • If lead pump fails to operate system will start standby pump. Lead and standby pumps will alternate operation. • If sump pit “very high water level” float switch is activated, both lead and standby pumps will be started and system alarm will be energised. Pumps will stop if water level drops to “low water level”. • If sump pit “very low water level” float switch is activated, power supply will be terminated to both lead and standby pumps and system alarm will be generated. Power supply will be restored when the water rises to “low water level”. • Control system will be interfaced with BAS to monitor pump status and trip alarms. OPERATION OF CLEAN WATER TREATMENT SYSTEM Clean water treatment system shall include the following: • • • Clean water treatment pumps Water treatment and chlorination system Control sensors Clean water treatment system shall transfer raw water from raw water tanks to the main clean water tanks, through the clean water treatment system. Clean water treatment system will be provided with independent control systems interfaced with BAS. 10.4.5 OPERATION OF CLEAN WATER TREATMENT PUMPS Clean water treatment pumps shall be controlled as follows: \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 85 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 10.4.6 • Clean water treatment pumps will be provided with independent control system interfaced with BAS. Control system will be interfaced with raw water tank level sensors and main clean water tank level sensors. • Clean water treatment pump will start when the water level in the main clean water tanks drops below the “low water level” set point. Clean water treatment will stop when the water level in the main clean water tanks rises above the “hi water level” set point. • If the water level in the raw water storage tanks is below “very low level” treatment pump will stop operation. • If lead pump fails to operate system will start standby pump. Lead and standby pumps will alternate operation. • Control system will be interfaced with BAS to monitor pump status and trip alarms, raw water tank level sensors and main clean water tank level sensors. OPERATION OF TOP LEVEL CLEAN WATER BOOSTER SYSTEM Top level clean water booster system shall include the following: • • Top level clean water booster pumps Control sensors Top level clean water booster system shall maintain water pressure in top floor clean water supply line. Top level clean water booster system will be provided with independent control system interfaced with BAS. 10.4.7 WATER BOOSTER PUMPS Clean water booster pumps shall be controlled as follows: • Clean water booster pumps will be provided with independent control system interfaced with BAS. Control system will be interfaced with clean water tank level sensors, booster pump variable speed drives and booster pump discharge line water pressure sensor. • Clean water booster pumps will start when the water pressure sensor in discharge line drops below minimal set point. Clean water booster pump variable speed drives will modulate the pump speed to maintain set discharge line pressure within set range. When the water pressure in discharge line exceeds the maximum set point pump will stop operation. • If the water level in the clean water tanks is below “very low level” booster pump will stop operation. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 86 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection • 10.5 Control system will be interfaced with BAS to monitor pump status and trip alarms and elevated clean water tank level sensors. FIRE PROTECTION SERVICES Fire alarm and detection systems Fire alarm and detection systems will be controlled by the fire alarm panel as described elsewhere in this document. BAS will monitor common alarm and the fire signal from the fire alarm panel. Fire Pump Set Fire pump set shall be provided with the independent control systems (one for each fire pump) as described elsewhere in this document. BAS will monitor common alarm from each control panel. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 87 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 11.0 FIRE SERVICES EQUIPMENT 11.1 FIRE SERVICES PIPEWORK 11.1.1 GENERAL The pipework installation in the plant room and above ground shall generally comply with the requirements described elsewhere in this specification. Pipe fittings shall be malleable iron to ANSI B.16.3 class 300 1b, screwed end for diameter up to 40mm and for diameter 50mm and above should be wrought steel but welded. A 25mm valve shall be fitted at the lowest point of each riser and shall be connected by means of 25mm galvanised iron pipe to the nearest floor drain. All pumps and controls shall be ULFM listed/approved. 11.1.2 FIRE BRIGADE BREECHING INLET (SIAMESE CONNECTION) Fire brigade 4 (four) ways breeching inlets shall be provided for the sprinkler and hydrant systems and be located at ground floor level in the positions shown on the drawings. Each breeching inlets shall conform with the requirements of PERGUB 92/2014, and shall consist of a 150 mm instantaneous male coupling and a back pressure valve, and be protected by a metal cap secured with a suitable length of a chain. A 25 mm diameter drain valve shall be incorporated to facilitate draining. The breeching inlet, including the check valve, shall be the same diameter and working pressure as the connected pipeline. The entire breeching inlet installation shall be enclosed in a metal box. The coupling Landing Valve Vander hyde type (Please confirm to local DPK / DAMKAR recommendations). 11.1.3 FLOW SWITCHES Flow switches shall be UL or FM listed type and approved by the Local Authorities. Adequate space shall be allowed above the pipework for the installation of flow switches. Switch and base plate shall be constructed of cast aluminium or hot dip galvanized cast steel and the paddle shall be copper or stainless steel. Rubber gasket shall be provided between the base plate and the cover. The paddle shall be able to be trimmed to size on site and shall be suitable for local electricity supply. The unit shall contain an adjustable 0-60 sec constant recycling retarding device to prevent false alarm from surges. The assembly shall be properly rated and be suitable for each system's working pressure. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 88 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 11.2 FIRE PUMPS 11.2.1 EXTENT OF WORKS The extent of works under this contract shall comprise the supply and install one package complete, testing, commissioning and handing over in working order and operating and maintenance manuals. The system shall be in accordance with the requirement in the latest edition of the codes and standard 11.2.2 GENERAL REQUIREMENTS The pump heads given in the schedule are guidance during tendering only, and the Contractor shall be responsible for the checking the total final resistances of each system, based on the actual pipe runs and equipment offered, prior to ordering. The calculation shall be submitted to the Engineer for approval. Any modifications to the system or any of its components, i.e. pumps, pipe work, motors, cables switchgear etc. which may be required to meet the scheduled duties and space limitation shall be carried out at the Contractor’s expense. The Contractor shall supply and install pumps of the standard type and performance as shown on the drawings. All duties of pumps given in the Tender Drawings shall be checked and where necessary corrected before ordering. Pumps shall be so selected that the design duty point is within 5% of the maximum efficiency point. The pump casing so selected shall have sample space to take an impeller one size larger than that capable of performing the design duty. The pump shall have a speed of not more than 3000 rpm and the efficiency should be minimum 60% unless otherwise approved by the Project Manager. All pumps and motors shall be of minimum vibration and noise level during operation. Vibration isolators shall be provided for all pump sets. Facilities shall be provided to prevent starting of pumps when the water tank is at low water level. An indicator for this low water level alarm shall be provided. Facilities to select which pump to be duty pump and standby pump shall be provided and be interchangeable. Leakage from pump gland shall be drained to the nearest floor waste. Pump curves for all pumps offered shall be submitted. Any curve indicating excessive shutoff head will not be approved. Each pump shall be provided with a gate valve at suction and discharge, approved check valve at discharge, approved strainer at suction, flexible connections at pump suction and \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 89 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection discharge, eccentric reducer at suction, concentric reducer at discharge, pressure gauges at suction and discharge, circulation relief valve and automatic air relief valve. Appropriate neoprene vibration isolation mountings shall be provided for each pump sets. The Contractor shall supply and install a control panel on 16 SWG drip proof metal cubicle enclosing the control switchgear for each pumping installation. 11.2.3 HORIZONTAL SPLIT CASE PUMPS The Horizontal split casing pump shall be of single stage or multistage, single volute, centrifugal type. Pump casing shall be designed to withstand at least 2 times the specified working pressure and shall be horizontally split with pump feet integrally cast to ensure that all thrust will transmit to the foundation. Impeller shall be of bronze to BS 1400 LG2C and shaft shall be of 316 stainless steel, statically and dynamically balanced after assembly. Wearing rings shall be of bronze to BS 1400 LB2C and shall be renewable. Shaft shall be of gland packing. The material of construction shall be as follows: 11.2.4 Casing - Bronze casing to BS 1400 LB2C Impeller - Bronze to BS 1400 LG2C, double section enclosed type. Shaft Seal - Gland Packing, bronze material to BS 1400 LG2C. Shaft Sleeves - Stainless steel 304 S 16 to BS 3100; Wearing Rings - Bronze to BS 1400 LB 2.C; Bearings - Ball thrust type rated for at least 40,000 hours L10 bearing lift. VERTICAL MULTI-STAGE PUMPS (JOCKEY PUMP) Multi-stage pumps shall be centrifugal type and arranged with vertical shafts. The pump casings shall be closed-grained cast iron to BS 1452 grade 260, accurately machined and assembled with metal-to-metal joints. The impellers shall be of zinc free bronze to BS 1400 PBI, mechanically balanced and keyed to shaft. Renewable guide rings are to be provided in the casting, keyed to prevent rotation. Pumps shall be driven by elevated in-line TEFC squirrel cage motors via extended vertical shafted complete with universal couplings. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 90 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection The shafts shall be stainless steel grade 316. Stainless steel 304 sleeves shall be provided to protect the shaft in the water space and through the sealing glands. The sleeves shall be keyed to prevent rotation and secured against axial movement. The bearings shall be of ball or roller type protected against ingress of water, dirt and other matter. 11.2.5 DIESEL ENGINES PUMP The pump driver shall be a horizontal shaft type internal combustion engine, manufactured by Clarke , rated at 1780 rpm – 2960 RPM, clockwise rotation viewed from the end opposite the pump. The engine shall be provided by the pump manufacturer with, at a minimum, the following accessories for automatic operation. • cooling waterlines, pressure regulator, strainer, bypass lines and necessary fittings for engine cooling system, pre-piped and factory mounted. • flexible exhaust connector • exhaust silencer • engine jacket water heater, factory installed. • one set dual batteries, lead acid storage type. • fuel storage tank sized to provide a minimum supply of one gallon of fuel per engine maximum rated horsepower plus 5% for sump area plus 5% for expansion area, The tank shall be furnished with legs for floor mounting and with a direct reading level gauge. 11.2.6 OPERATION Fire pumps will be fully automatic in operation and once started will only be able to be stopped manually. The Contractor shall supply and install all required pressure and flow switches and wiring etc. to enable the system to operate as described. Jockey pumps shall be arranged for automatic starting and stopping by means of pressure switches. When the water pressure in the sprinkler or hydrant system drops to below 90% of the pre-set level the pressure switch will activate the jockey pump. A minimum run timer shall be incorporated to prevent the jockey pump from being started too frequently. If the pressure in the system further drops to 80% of the pre-set level, the jockey pump shall stop automatically and another pressure switch shall initiate the selected duty pump to start. If the system pressure drops further, due to the failure of the duty pump or other reasons, a third pressure switch shall initiate the standby pump to cut-in automatically. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 91 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 11.3 HYDRANT INSTALLATION 11.3.1 GENERAL Hydrant pipework shall be supplied and installed as shown on the drawings and in accordance with SNI and the local regulations. 11.3.2 PIPEWORK The hydrant pipework shall be as specified in section “Pipework, valves and fitting” in this document. A 25mm or 40 mm diameter isolating stop valve shall be provided on the feed pipe to each hose reel to match the existing pipe size. The valve shall be operated by a hand wheel on which shall be permanently marked the direction of opening by means of an embossed arrow or the word "OPEN". A union shall be fitted between the isolating stop valve on the feed pipe and the hose reel to enable individual hose reels to be dismantled for maintenance or overhaul. 11.3.3 HYDRANT PILLARS Hydrant pillars shall be provided with concrete foundations and thrust blocks, as shown on the drawings. The coupling Landing Valve Vander hyde type (Please confirm to local DPK / DAMKAR recommendations). 11.3.4 INDOOR HYDRANT BOXES Indoor hydrant boxes shall be provided with hydrant Pressure Reducing Valve in each inlet pipe (Ø40 and Ø 65), hydrant valve, hose valve (complete with the hose), and manual call point, indicator lamp, fire brigade telephone jack and alarm bell, as shown on the drawings. 11.4 AUTOMATIC SPRINKLER SYSTEM 11.4.1 GENERAL A complete automatic sprinkler system shall be supplied and installed in accordance with the drawings, the latest requirements of the Local Fire Authority, NFPA Rules and the requirements described hereinafter. 11.4.2 HAZARD CLASSIFICATION OF OCCUPANCIES The sprinkler installation in the various areas shall be based on the following hazard classifications as follow : Area Data Centre : Lobby, Hazard Light Hazard Group K-factor 5.6 Response Quick \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 92 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Area Corridors, common area Office Void ((high level ceiling) 11.4.3 Hazard K-factor Response Light Hazard Group Light Hazard Group 5.6 8 or 11.2 Quick Quick SPRINKLER PIPEWORK Sprinkler pipework shall be supplied and installed in the manner described in the section on ‘Pipework’ except noted here in after. Sprinkler pipework shall be installed so that it can be drained to the installation control valve. Trapped sections of the pipework, if any, shall be drained through permanent pipework fittings with drain valves and brass plugs or caps. The Contractor shall make allowance for additional drain points as required, to suit site conditions. 11.4.4 SPRINKLER HEADS General Sprinkler heads shall be of FM/UL listed. They shall be tested to with stand a water pressure of 3500 Kpa before activating. They shall be to an approved pattern with deflectors for upright, pendent or concealed application as required. Sprinkler shall install when floor in above and ceiling distance is more than 800mm (as SNI rules). Type and Finish When as requested by the interior Design, Sprinkler heads on suspended ceilings shall be flush mounted and consist of a glass bulb, spray pattern type pendant sprinkler head. All exposed parts of the sprinkler heads shall be chromium plated and guard cover (c/w caging). In concealed spaces and services areas, the sprinkler heads shall be glass bulb paint brass spray pattern type, upright sprinkler heads. Temperature Rating The temperature rating of sprinkler heads shall be selected with regard to the occupancy of each protected area. Sprinkler heads shall generally have a nominal temperature rating of 68°C. In areas where it is generally warmer, e.g. kitchen areas, genset and on the ceiling House LV Room (Under Intake Ducting), the sprinkler heads shall have a temperature rating of 93°C or higher. The heat sensory element shall have a reaction time of not more than two minutes. Orifice Sizes \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 93 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection The sprinkler head orifice sizes shall be as follows unless otherwise specified on the drawings: Orifice Size 12 mm 15 mm 20 mm Hazard Class Light Hazard Ordinary Hazard Extra Hazard Spare Sprinkler Heads The number of spare sprinkler heads shall be supplied as listed in ‘maintenance and service’ section and as per Regulation 26/PRT/M/2008 These spare sprinkler heads, spanner and a test record book shall be kept in a signal red baked enamel steel cabinet of 1.6 mm thickness. The cabinet shall be complete with lock under the master key system and be installed in the building control room or engineer's room. Sprinkler Head Locations Sprinkler heads shall be located in positions shown on the drawings. While slight relocation may result from building construction features or interference from other services, the maximum spacing between sprinkler heads and coverage area shall not exceed those stipulated in the NFPA 13 Rules or SNI rules. Side wall Sprinkler Head Sprinkler shall be extended coverage, quick response. Allowance shall be made for such relocations within a radius of 1500 mm of the indicated positions without additional cost. The Contractor shall co-ordinate with the ceiling installer to set out the sprinkler locations to suit the site location of the unit grid. In general, all sprinklers shall be located at the centre of the ceiling unit. Chrome plated wire mesh guards shall be used to protect the sprinkler heads in the car park, all plant rooms, all storage areas, and other areas where there is a risk of accidental damage. 11.4.5 SPRINKLER ALARM SIGNAL A sprinkler alarm signal will be transmitted to the Master Control Fire Alarm Panel via the monitoring module in order to monitor the status of all flow switches. This work will be carried out by the electrical contractor. This contractor shall supply and install all required flow and pressure switches. 11.4.6 MAIN ALARM CONTROL VALVES SETS Main alarm control valve sets for the building sprinkler system shall be FM/UL approved type. Each control valve set shall be complete with the following: • Main stop valve. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 94 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection • • • • • Alarm valve. Water motor alarm and gong (300 mm diameter). Test and drain valve. Pressure gauges to indicate upstream and downstream system pressure. Approved proving pipe or direct read water flow meter. Every stop valve in the sprinkler installation including the main stop valve, shall be secured opened by a leather strap and brass lock water the master key system and shall be fitted with a label indicating the area protected. 11.5 PORTABLE FIRE EXTINGUISHERS 11.5.1 GENERAL The location and quantity of the fire extinguishers shall be installed in accordance with the drawings and local regulations. Dry chemical powder type and Carbon Dioxide/portable fire extinguishers shall be provided under this package. Every fire extinguisher shall be manufactured to comply with the following appropriate British Standards and shall be approved for use by the Local Fire Authority: · · BS EN3 and SNI 03-3987 BS EN3 and SNI 03-3987 - Portable Dry Powder Type of Fire Extinguisher; Portable carbon Dioxide Fire Extinguisher; All fittings and safety features necessary for the fire extinguishers to be approved for use as a complete unit shall be incorporated. 11.5.2 INSTALLATION Each fire extinguisher shall be suitably installed for upright instantaneous operation. Wall extinguishers shall be mounted 1.2 m above the floor level. Suitable hangers or brackets shall be provided. The necessary operation, maintenance and reloading instructions shall be clearly displayed permanently on the body. All fire extinguishers installed other than inside electrical and mechanical plant rooms, shall be complete with metal cabinets. The metal cabinet shall be painted signal red and be complete with glass front and master key lock. 11.6 AUTOMATIC SPRINKLER SYSTEM (PREACTION) The pre-action system must complited a cabinet and the system shall be initialed by detectors heated to trip point. When tripped, the normally closed detector circuit shall open the relays in the control panel thus shutting off power to the solenoid valves in the trim box and sounding the electric fire alarm bell. When the solenoid valves open the pressurized water in the top chamber of the flow control valve shall be released and the clapper open. The system shall \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 95 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection then fill almost completely with pressurized water. When a sprinkler reaches operating temperature, it shall open and spray water on to the fire. When the temperature in the fire area drops below the trip point of all detectors, the detector circuit shall be reclosed. A relay shall be closed in the panel which shall energize the timer. Water shall continue to discharge from the open sprinklers for 1 to 5 minutes, depending on the timer setting. When the timer cycle is complete, a relay in the control panel shall close and energize the solenoid valve in the trim box. The flow of water shall stop from above the clapper of the flow control valve thereby causing pressure to build up which shall close the valve clapper and stop the flow of water to the opened sprinklers. The electric fire alarm shall continue to sound until the reset button is pushed. Should the temperature build to the trip point of any detector during any phase of the cycle, the system shall continue to flow or immediately start the flow of water to the fire. All system components shall be UL listed / FM approved. The system shall have the following components. • Pre-action Valve completed caging by costume. • Pre-action Valve completed Double interlock releasing system. • Flow control valve. • Trim piping and components • Check valve (rubber seat) • Gate valve (subsidiary stop valve) • Firecycle control panel • Valve trim box • Battery charger • Firecycle detectors • Firecycle detector cable • Main drain valve • Intermediate drain valve • Priming valve • Position indicator • Strainer • Electric alarm bell for bell for local fire alarm • Acceptable primary or maintenance air • A pressure switch to either activate an electric alarm or to shut down desired equipment • Water motor alarm (Water alarm gong) • Alarm test valve • Alarm shut-off valve 11.6.1 Flow Control The flow control valve shall be a quick opening, differential diaphragm valve with a springloaded floating clapper. The flow control valve shall be used to facilitate manual or automatic on/off control. It shall also be used to control water pressure or water flow rates. The valve shall form an integral part of the firecycle system. 11.6.2 Fire cycle Control Panel \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 96 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection The fire cycle control panel shall incorporate the necessary relays, timers, key type switches, alarms and trouble lights essential to the operation of a fire cycle system. The panel shall employ a printed circuit board and shall be completely factory wired ready to make connections to the battery charger and fire cycle valve trim box. 11.6.3 Valve Trim Box The fire cycle valve trim box shall house electrical terminal blocks, 24-volt D.C. solenoid valves, and pressure switches necessary for the operation of a fire cycle system. It shall be prewired and plumbed by the manufacturer for connections. It shall have a fully opened door for easy access to all components. 11.6.4 Fire cycle Detectors The fire cycle detector shall be a heat sensitive, normally closed, electrical detector which operates at a fixed temperature. The detector units shall be connected with fire resistant detector cable in series from and to the fire control panel. When a detector is heated to the temperature set point, a mechanical switch opens and breaks the series circuit interrupting the flow of current. When the temperature drops below the set point, the circuit shall be re established. The heat probe shall be stainless steel and the top should be color coded for temperature set point and spacing. The detector trip temperature should be factory set and is not adjustable in the field. The detector shall be able to withstand 81°C temperature for short periods of time without damage. The conduit box attached with the detector shall be copper free aluminium with threaded conduit connections and adaptors provided for detector cable. 11.6.5 Battery Chargers and Batteries Sub-Contractor shall supply and install individual automatic 24 VD.C. trickle battery charger and batteries with sufficient capacity, maintenance free sealed to supply the whole system. The chargers shall have facilities for manually operated boost charge, capable of re charging the batteries from fully discharged to fully charged condition in not more than eight (8) hours. The unit shall be suitable for use on a 220 V A.C. 50 Hz single phase supply and shall automatically maintain the 24 V sealed lead acid batteries in a state approximate to full charge and at the same time to compensate for the standing load. The batteries shall be capable of maintaining the system for not less than 12 hours and then be able to operate in the “alarm” condition for all bells for not less than one hour continuously. Fault indication shall be given in the status panel when any one of the battery chargers is faulty or when the D.C. voltage is low. 11.6.6 Smoke Detectors All smoke detectors shall be of the photoelectric (optical) type. They shall comply with BS EN 54-7 or other equivalent standards acceptable to the employer’s representative. The smoke detector shall operate on light scattering principle, containing an emitter and photo sensor. The scattered light reaching the photo sensor shall be proportional to the smoke density inside the detection chamber. The measuring chamber shall be so designed to create a very low background signal in clean air condition. Other aerodynamic and optical design shall be employed to control dust settlement to settle on non-critical surfaces so that high dust level \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 97 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection can be tolerated. Both the optical components and the detection chamber shall be protected from the environment but still allow smoke to enter freely into the chamber for sampling. All smoke detectors shall be fully operable between -10ºC to +70ºC and up to 95% RH, noncondensing. 11.6.7 Heat Detectors All heat detectors shall be of a combination of fixed temperature operation and rate of rise of temperature operation except in areas of high temperature such as kitchen or generator, etc. where rate-of-rise response is undesirable due to the probability of false alarms and shall be of resettable electronic type. They shall comply with BS EN 54-5 or other equivalent standards acceptable to the employer’s representative. The nominal operating temperature for heat detectors shall not exceed the expected maximum ambient temperature by more than 30ºC. Generally, the temperature rating of heat detector shall be 60ºC. The heat detector shall employ two matched thermal sensing elements in a bridge configuration to give a response depending both on absolute temperature and rate of change of temperature. The reference and sensing thermal sensors shall be fabricated under identical conditions to ensure good matching and excellent tracking with both temperature and aging. Fixed temperature heat detectors shall be provided in areas where rapid changes of ambient temperature are likely. This shall include, but not limit to, in kitchen, water heater room, generator room, transformer room, boiler room, sewage treatment plant and the like. All heat detectors shall be fully operable between -10ºC to +70ºC and up to 95% RH, non condensing. 11.7 FIRE SUPPRESSION SYSTEM WITH DETECTION / RELEASE SYSTEM 11.7.1 FIRE SUPPRESSION WITH NOVEC SYSTEM 11.7.1.1 General Requirement 1. The work carried out by contractors includes Procurement, Installation, Testing and Commissioning, Provision of Manpower and Equipment, Shop Drawing and As-built Drawing. 2. Fire extinguisher installation work is done based on fire extinguishing system diagrams and plan drawings 3. The main components that must be procured and installed consist of but are not limited to the following equipment: − − − − − − − Piping, support and hanger, Valves, Instrument, Nozzle, Cylinder gas, Detector (addressable) Wirings, \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 98 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 11.7.2 GAS FIRE SUPPRESSION SYSTEM 11.7.2.1 General I. SCOPE These descriptions and conditions explain the detailed material specifications and how to install the Gas Fire Suppression System, which includes complete and perfect work starting from the provision of equipment and materials to site installation, testing, supervision, maintenance and warranty, for the project. II. APPLICABLE STANDARDS AND PUBLICATION A. The design, equipment, installation, testing and maintenance of the Clean Agent Suppression System shall be in accordance with the applicable requirements set forth in the latest edition of the following codes and standards: NFPA 70 : National Electrical Code (NEC) NFPA 72 : National Fire Alarm and Signaling Code NFPA 76 : Fire Protection for Telecommunications Systems NFPA 92A : Recommended Practice for Smoke Control Systems NFPA 2001 : Clean Agent Fire Extinguishing Systems Ul Listed FM Approved Requirements of the Local Authority Having Jurisdiction (AHJ) Manufacturer’s Design, Installation, Operation & Maintenance Manual Standar Nasional Indonesia (SNI) The complete system shall have the applicable following listings and approvals: Factory Mutual Global Gas Fire Suppression System is a fire extinguisher that works automatically by using gas and simultaneously notifies a fire with a light sign and a bell sound in each protected room and in the central system Fire Suppression & Alarm System. Gas Fire Suppression System must use Industrial Agent (gas) produced by local Industry for easy refilling. The contractor for this work must follow & be bound by the requirements stated in: − − − − − − General explanation Tender Drawings, Construction drawings Administrative requirements Technical specifications Shop Drawings \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 99 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection − Hand over & Pre-bid Meetings The contractor must be able to attach his agency letter from the system offered or a Supporting Letter from the Authorized Distributor Agent. The agency letter is also accompanied by a distributor registration certificate from the Ministry of Trade. All equipment requiring grounding must be properly grounded and meet the requirements. For a perfect system, the contractor is obliged to repair or add equipment, if needed in the completeness of the system, even though it is not described or stated. All pipes must be painted in a color to be adjusted / determined later in order to distinguish them from other installations. All metal pipes embedded in the ground must be protected by an anti-rust layer. Gas Fire Suppression is a fire extinguisher that works automatically using gas and simultaneously notifies a fire with a light sign and a bell sound in each protected room and on the Central Fire Suppression and Alarm System systems. 11.7.3 SYSTEM DESCRIPTION Novec 1230 Fire Protection Fluid – Novec 1230 fluid, referenced as FK-5-1-12 in NFPA 2001 and ISO 14520, is a fluorinated ketone (or fluoroketone) with a chemical structure of CF3CF2C(O)CF(CF3) 2. It is a clear, colorless, odorless liquid that is super pressurized with nitrogen and stored in high-pressure containers. The system used is "Total Flooding System". When the system works, the oxygen concentration will be below 4.5% but above 4.7%, so the fire will be extinguished but it is still (must) safe for humans. With a discharge time of 10 seconds (2018 edition of NFPA 2001). Gas fire extinguishing system must UL Listed & FM Approval standard and consists of the following equipment: − − − − − − − − − − Agent Suppression stored as gas / vapor in cylindrical tubes System were complete with cylinder valve, solenoid valve cylinder, selector valve, low pressure switch. Fire detector Discharge Indicator Control Panel Manifold Fire Alarm Bell & Strobe Light Lamp. Manual Release – Abort Switch Piping system complete with nozzle Pressure relief device. a. Fire suppression system must be able to work manually or automatically. b. The manual operation system has a work sequence as : − Fire Pull release switch \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 100 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection − − − − − − − c. Alarm for evacuation Ventilation blocked Press the abort switch to cancel, when it will cancel the gas discharge Time delay Gas discharged Discharge indicated flickered Fire put out. Automatic Operation will have the following sequence: − − − − − − − − Smoke Detection ROR Heat Detection Fire alarm Fire ventilation (Cross Zone/ counting cone) Alarm for evacuation Ventilation blocked Time delay Fire put out. d. For system supervision, testing and inspection must be carried out periodically of the equipment used. Clear lists should be made for testing and inspection systems to facilitate management. e. For spaces that use a gas protection system, Agent Gas is placed centrally in one storage tube room making it easier for maintenance and monitoring. 11.7.4 JOB DESCRIPTION FOR INSTALLATION OF GAS • Carry out the installation of gas agent piping starting from gas bottles to complete discharge nozzles, fittings, pipe racks and other auxiliary tools according to the plan drawings and system completeness according to NFPA standards. • Conducting a leak test (tightness) / Integrity Test on the rooms to be installed the Fire Suppression System, proving that they have an "Enclosure Integrity Certification" certificate. It is necessary to carry out this test so that the "total floading" system can effectively extinguish fires. • Carry out the installation of wiring detectors according to the complete plan drawing of pipes, hangers, cable / trunking racks and others. • Implement control cables from each protected room, fire suppression panels and storage tube rooms. • Provide and install central equipment, alarm equipment, Photoelectric Smoke Detector, discharge nozzle and other auxiliary equipment so that the fire suppression system can work safely and perfectly. • Produce shop drawing and submit a revised drawing for approval. • Carry out system-wide testing. • Submit brochures, operation and maintenance manuals in Indonesian \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 101 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection • Arrange for permits and submit good results work letter from the local Fire Department. • Carry out a maintenance period of 3 months and provide a guarantee period. • Provide pictures and practical writings affixed to each gas central • Train building owner operators. 11.7.5 TECHNICAL SPECIFICATIONS OF MATERIALS AND EQUIPMENT a. Conduit cables and pipes. • Power Cables: − Copper cable core − Voltage 1000 Volts and 600/1000 volts − Cable Type NYA, NYM dan NYYHY − Minimum size 1½ mm² • Detectors Cable and Risers: − FRC type − Copper cable core − Voltage 300 Volt − Twisted Shielded cable type − Size minimum AWG 18 • Control Cables (cables to bell, alarm etc) : − Copper cable core − Voltage 1000 Volts and 600/1000 volts − Cable Type NYA, NYM dan NYYHY − Minimum size 1½ mm² • Conduit Pipes: − PVC Conduit Hight Impact for fittings − Voltage 300 Volt • Kabel Tray: − Size 20x10 cm for neatness of installation placement − Hot Dip Galvanized − Local productions b. Pipes and fittings for gas • Piping Material: − Black Steel Seamless schedule 80 (standard API-5L atau JIS, ASTM) − Red Painted − Fitting: − Class 3000 c. Centralized Cylinder Station \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 102 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection • • • • Function for storage of Gas Agent The number of cylinders must be in accordance with the needs of fire fighting in the largest zone Cylinder Station must have : − Frame − Cylinder valve − Safety vent (release valve) − Selector valve − Low Pressure switch − Actuating cylinder − Cylinder valve solenoid − another equipment to complete the system Each cylinder must have a clear plate name. d. Gas Agent • Refilling to each tube must not exceed the ASME filling density standard for boiler and pressure vessel code. • The filling into the tube must be 55 bars. e. Discharge nozzle. • Material: corrosion resistant metal - ceiling plate type complete with base plate in accordance with agency standards. • Type: − Can disperse gas evenly. − Each nozzle has a flow capacity as needed (see picture) − Easy to clean. • Size: refers to standard manufacture specification • Directions: refers to drawings f. Addressable Photoelectric Smoke Detector • Type: Addressable • Each detector can detect smoke / fire • Quantity: refers to drawings g. Fire Alarm Bell • Fire alarm bell placed on each room • The buzzer alarm must be on the central LCD panel h. Warning Light / Discharge Indicator Must have bold red writing and bright light and work so that it attracts attention with cautionary writing (refers to drawings) i. Release – Abort Switch \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 103 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection • • • • From the type of electrical contact that will work when the button is pressed for the release switch and abort switch, the entire unit must be formed with a housing made of non-combustible, rust-resistant and red colour materials. Type: surface mounted. Ability: When working, the contact remains ON until it is reset again. Can be tested with a toggle switch in it. Size: according to indicator light equipment, lock of switch and pushbutton. 11.7.6 INSTALLATION SPECIFICATIONS 11.7.6.1 Installation • Installation of the wiring installation • In areas where the installation ceiling is clamped to the concrete slab or hung using a separate hanger every 100 m using a complete protective pipe fitting. • Under the installation ceiling, it is attached to the column or wall using pipe protectors complete with fittings. • In the installation partition installed without pipes. A. Installation of Gas Pipes • In areas with plafond installation, hang up using a hanger and clam firmly enough to hold the pipe. • Under the installation ceiling, the piping is installed in the trunking cover • How to install the hanger is as follows: − Maximum distance of 3 m for diameters > 1½" − And close to the point of concentration of the load (fitting, valve or nozzle) − The maximum distance between the hanger and nozzle on the pipe is as follows: − Pipes 25 mm – 90 mm − Pipes 32 mm – 120 mm − If this maximum distance is exceeded, a hanger must be added. B. Piping Connections • Pipe fitting by welding for sizes above > Ø 2" • Pipe connection must be watertight. • All fittings using special type for connection with welding and screwed according to the size of the pipe referred. • After the pipe has been installed, it must be painted red. • Before nozzles and other equipment are installed the pipes must be blown-out and tested. For the completeness of the installed system to be equipped with a pressure relief device and others according to the pipe installation conditions. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 104 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection C. Equipment Installation • Discharge nozzle: installed flat with a complete ceiling of the base plate. • Smoke detectors complete with wiring, installed flat by the number according to the plan drawing. The wiring should be neat and out of sight. • Because some are installed along the edge of the wall, the partial nozzle type is 90º to spray according to the drawing. • Storage Cylinder Rack placed in the warehouse near the equipment room or placed according to the picture. Storage cylinder rack consists of several cylinders, where each cylinder must have been assembled in a number not exceeding the planned space. Installation of storage cylinder rack must be complete with information according to the system and placed on a strong frame. Gas filling must comply with the storage cylinder specifications. Each storage cylinder must be assigned a name plate that states: − Filling weight − Lock of switch − Pressurization level − Gas Agent Statement D. Panel Suppression System Placed on the ground floor in the ME room which is adjacent to the storage cylinder, complete with indicators according to the system and other equipment such as: • System : Full addressable • Voltage on stand by : Depend on system • Printer : HP, Canon, Epson and serial port • Alarm current : Depend on system • Humidity : 0 to 49° • Capacity : 250 Addresses per loop • Dry contact output rating : 2A at 24 VDC • Max output : 4A • Circuit style cable : Style 4.5 and 7 • LCD Capacity : 80 character • Feature : − Application operating system computer under windows − Up load/down load from memory flash at MCU. − Disable/enable program. − Fiber optic system available − Network System available • Facilities : − Serial port RS232 x 2 − Built in Buzzer. − Dry output x 3 − Wet output x 2 \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 105 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection • • • Certified UL Listed and FM Approved + NFPA Release - abort switch : Placed in each protected room (see picture), placed 150 cm high from the finish floor, easy to see and easy to reach. Discharge indicator, placed according to plan drawings and specifications. Note: • • All systems to be installed, must be drawn up in advance to be approved by the Management Constructions consultant. The equipment to be installed must be new in this case there must be no defects and must be approved in advance by Management Constructions consultant. 11.7.6.2 Fire Suppression System Contractors, Agents and Products A. The contractor who will carry out this work must have experience in the field of procurement, installation and maintenance of the Fire Suppression System for at least 10 (ten) years and proven by a certificate from the principle and an official letter of support from an Authorized Distributor in Indonesia. B. Products used must come from an authorized distributor in Indonesia, which is indicated by a Certificate of Registration as a Distributor of Overseas Production Goods - Kementerian Perdagangan C. The product used must have a Certified Refilling & Booster as well as a Gas Filling Tool from products Agent in Indonesia for easy refilling. D. The proposed Fire Suppression equipment must be from 1 (one) vendor so that it can be accounted for and must get support from the principal. E. The contractor must supply the Hydraulic Flow Calculation Fire Suppression System used. 11.7.6.3 Specific Technical Specifications, Gas Suppression Contractor and Engineer 1. All equipment must be UL Listed and FM Approved 2. In accordance with Undang - Undang No.2 of 2017, the contractor must have competence with a Certificate of Expertise (SKA) minimum " AHLI TEKNIK PLAMBING DAN POMPA MEKANIK – MADYA", "AHLI TEKNIK PROTEKSI KEBAKARAN - MADYA ". 3. In accordance with Undang - Undang No.18 of 1999 on construction services, the contractor must have the competence with a certificate of (minimum) "PEMELIHARAAN DAN PERAWATAN BANGUNAN - MUDA". 4. Have a Badan Usaha Jasa Pelaksana Konstruksi Certificate issued by the LPJK with a (minimum) middle class classification (KLASIFIKASI MENENGAH) of Mechanical and Electrical Installation Business Servises. 11.7.6.4 Testing a. The testing implementation must be witnessed by the Constitutional Court consultant, making a test report b. All equipment and materials for testing are provided by the Contractor. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 106 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection c. Provision of room integrity testing for protected room. d. Testing is carried out for each room / unit. e. Gas fire extinguishing piping system testing. • The test is carried out before the gas cylinder and nozzle are installed. • All holes are closed, then the N2 gas is pressed into the system by 10 kg / m² (seen on the pressure gauge) for a period of 10 minutes. • If the pressure gauge shows a constant number, it means that the piping has been declared good. • System Testing: − Before the system testing is carried out, make sure the discharge command is connected at the time of the test. − Photoelectric smoke detector was tested with smoke and then checked whether it was in accordance with the expected system sequences. Testing must be in accordance with the manufacturer's recommendations and witnessed by the relevant specifications. • Maintenance: To ensure that the system runs well, the Contractor must take into account the cost of periodic testing as stated below: − Dried test is done once every 6 months by doing: o Electrical testing o Monitoring of pressure condition in storage cylinder on pressure gauge. • Fire Detector Testing All installation and equipment operations must be tested so that they are obtained and work perfectly according to the manufacturer's requirements and the specifications requested. If necessary, equipment installation materials are requested by the Construction Management Consultant / Supervisory Consultant appointed to be tested in the laboratory at the expense of the contractor. The test stages are as follows: − Every part of the wiring installation must be tested so that good results are obtained according to the System Work Design and manufacturer's requirements. − For the part to be closed, the test is carried out before and after the part is closed. − All equipment must be tested in good condition and work perfectly according to the factory requirements that System Work Design wants. − All connections shall be checked and tested in a fully connected state with the correct polarity. − All control systems and work systems must be tested in accordance with the required requirements. − All test results must be made a written report and witnessed by the Construction Management Consultant. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 107 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 11.7.7 SUMMARY OF SPECIFICATION STANDARDS 11.7.7.1 TECHNICAL: 1. 2. The gas agent used is NOVEC 123 Gas fire suppression system based on standard UL Listed & FM approval 11.7.9.2 DOCUMENT: 1. 2. 3. 11.8 Supporting Letter from Authorized Distributor Agent Distributor Registration Certificate from the Ministry of Trade Certificate of Refilling Station / Booster Facility from the manufacturer to ensure the ability to refill the gas ASPIRATING SMOKE DETECTORS (ASD) The ASD shall be the latest and most advanced detection technology to provide very early warning and the best nuisance alarm rejection for a wide range of applications. Building on the Flair detection technology and years of application experience, ASD detectors achieve consistent performance over their lifetime via absolute calibration. In addition, the ASD delivers a range of revolutionary features that provide user value. 1. Flair Detection Technology The ASD shall have Flair new detection with large chamber that forms the core of aspirating smoke technology, providing better detection, zero nuisance alarms, higher stability, increased longevity and dust discrimination. The sampled particles using a high power photodiodes allow vastly more data that can be used to derive actionable information about the observed particles using analytics. A high-power LED combined with an LVSC (large-volume smoke chamber) sampling chamber results in unparalleled adjustable sensitivity with low aerodynamic resistance and the utmost resistance to soiling. These features ensure durability and a long system life. The patented lint filter helps suppress one-off disturbances. 2. Installation, Commissioning and Operation ASD shall be equipped with a powerful aspirator that enables use of a total of 2x984 ft (2x300 m) of sampling pipe in the two pipes model with two sensors. Out of box operation is made possible with EasyConfig which allows airflow normalisation and AutoLearn Smoke and Flow to be initiated from within the detector. Sampling tubes for all systems can be accurately calculated, optimised and documented with the VdS-tested ASD PipeFlow PC program. This offers the possibility of asymmetrical and therefore cheaper pipe layouts. ASD Confi g is the tool for commissioning and maintaining the ASD. The Config Over-Line function means this can be used without additional networking, including from the fire alarm control panel (FACP). And RS 485 networking allows an entire ASD array to be visualised and operated at the same time. 3. Networking \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 108 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection ASD devices communicating on networking shall provide a robust bi-directional communication network allowing continued redundant operation even during single point wiring failures. Networking enables primary reporting, centralized configuration, control, maintenance, and monitoring. 4. Ethernet connectivity ASD detectors shall have Ethernet connectivity as standard features. The detector can be added to a corporate network, PC’s installed with ASD monitoring and configuration software to connect wirelessly to the detector via the network. 5. Backward Compatibility ASD must be compatible with existing ASD installations. The detector occupies the same mounting footprint, pipe, conduit and electrical connector positioning as ASD. ASD is also compatible with existing networking installations allowing monitoring of both ASD Net and legacy detectors via the latest ASD application. ASD shall have Features as follow: • one and two pipe models. • LVSC (large-volume smoke chamber) technology delivers reliable very early warning in a wide range of environments with minimal nuisance alarms. • Multistage filtration and optical protection with clean air barriers ensures lifetime detection performance • Five alarm levels and a wide sensitivity range deliver optimum protection for the widest range of applications • Simple LED display provides instant status information for immediate response • Flow fault thresholds per port accommodate varying airflow conditions • Separate filter retains dust and remaining filter life for predictable maintenance • Extensive event log (20,000 events) for event analysis and system diagnostics • AutoLearn smoke and flow for reliable and rapid commissioning • Referencing to accommodate external environmental conditions to minimise nuisance alarms. • Remote monitoring with Networking for system review and proactive maintenance • Ethernet for connectivity software for configuration, secondary monitoring and maintenance • USB for PC configuration, and firmware upgrade using a memory stick • Field replaceable sub-assemblies enable faster service and maximum uptime. Listings / Approvals • UL • ULC • FM \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 109 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection • ActivFire • CE • VdS • EN 54-20, ISO 7240-20 One or two Pipe sampling • Class A (40 holes / Fire 1 = 0.028% obs/m) • Class B (80 holes / Fire 1 = 0.027% obs/m) • Class C (2x120 holes / Fdire 1 = 0.056% obs/m) 11.9 LI-ION TAMER 11.9.1 GENERAL The off-gas monitoring system is a system comprised of a distributed sensing network that is designed to monitor lithium-ion battery electrolyte solvent vapour venting. The off-gas detection system should be installed in accordance with the manufacturer’s recommendations. The system includes the following components: • Sensors (Monitoring and Reference) • Hub (Power over Ethernet (PoE) or Direct Power) • Terminator • PoE & Ethernet Switches • Controller • Cables • Relay Module (optional) • Power Supplies 11.9.2 COMPONENTS 11.9.2.1 SENSORS : Monitoring Sensor (Part # LT-SEN-M3) & Reference Sensor (Part # LT-SENR3) - Monitoring Sensors shall be distributed in the application to monitor for lithium-ion battery cell venting. - Reference Sensors shall be distributed in the application to monitor nuisance alarm sources. - Sensors shall receive power supplied by the Hub. - Sensors shall provide off-gas, temperature, and humidity readings via CANbus to the Hub. - Sensors shall have two RJ45 connectors for upstream and downstream connection along the daisy-chain. - Sensors can operate within relative humidity ranges from 0 to 90%, and temperature ranges from10 to 50°C (14°F to 122°F). \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 110 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection - The unit will be certified to the following: • ETL listed to UL/IEC 61010 and CSA 22.2 NO. 61010 for product safety • EN 61326-1:2013 for EU Directive (2014/30/EU) • RoHS 3 EU 2015/863, WEEE, and REACH compliant • UKCA • FCC • The sensor shall be manufactured in an ISO 9001:2015 production environment. • The sensor shall be capable of self-diagnosing error states. • The sensor shall be checked with yearly maintenance checks to continue sensor performance. The validation of sensor operation shall be done in accordance with the manufacturer’s recommendations. 11.9.3 HUB, PoE & hub, direct power ( part#lt-acc-hub-poe, lt-acc-hub-pwr ) - The Hub originates the daisy-chain connection of the sensors and distributes 12 VDC to the sensors. - The Hub - PoE shall receive power from PoE. - The Hub - Direct Power shall receive power from a 12 VDC Power Supply. - The Hub shall be capable of communicating with the sensor(s) over CANbus. - The Hub shall be capable of communicating information to the Controller via TCP/IP over Ethernet. - he Hub - PoE shall have two RJ45 connectors for the daisy-chain connections to sensor(s).The Hub - Direct Power shall have one RJ45 connector for the daisy-chain connections to sensor(s). - The Hub shall be capable of detecting various errors and alarm conditions for selfdiagnosing capabilities. 11.9.4 TERMINATOR - The terminator shall be an RJ45 . plug that terminates the sensor’s daisy-chain CANbus connection. 11.9.5 ETHENET SWITCH – POE ( PART # LT – ACC – POE ) - The Ethernet Switch - PoE shall distribute 44-57 VDC to the Hub(s). - The Ethernet Switch - PoE shall be capable of communicating information from the Hub to the Controller via TCP/IP over Ethernet. - All Ethernet ports on the Ethernet Switch - PoE shall meet IEEE 802.3af, Class 0. 11.9.6 ETHENET SWITCH ( PART # LT – ACC – ETS ) - The Ethernet Switch shall be capable of communicating information from the Hub to the Controller via TCP/IP over Ethernet. - 10/100 Ethernet ports shall meet IEEE 802.3i, 802.3u, 802.3x. 11.9.7 CONTROLLER ( PART # LT-CTR-SML ) \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 111 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection - The Controller is a Linux-based industrial computer that aggregates and processes sensor signals, communicates sensor status and records a detailed history of time-stamped data from the sensors for post-event diagnosis. - The Controller aggregates up to 100 sensors. - The Controller processes the sensor signal status and communicates if a lithium-ion battery cell venting has occurred. - The Controller provides temperature and humidity measurements from each sensor. - The Controller shall be capable of detecting and communicating system error status. - The Controller will require a power supply rated at 12 VDC. - The Controller will communicate system status through Modbus TCP/IP.The Controller will be capable of connecting to a relay module to provide configurable dry-contact outputs. 11.9.8 NETWORK CABLES ( PART # LT-ACC-NCL ) - The Network Cable(s) shall be Cat 5e or Cat 6a, straight through, shielded (S/UTP), snagfree, 22-26 AWG cable with 50 micro inches gold plated connectors and shield connected to RJ45 connector shell on both ends 11.9.9 ETHERNET RELAY MODULE ( PART # LT-ACC-ERO-16 ) - The Ethernet Relay Module shall connect to the Controller via RJ45 Ethernet. - The Relay Module shall provide 16x SPDT Form C relay outputs. 11.9.10 ETHERNET RELAY MODULE ( PART # LT-ACC-ERO-16 ) - The Power Supplies shall provide an output voltage of either 12 VDC or 48 VDC. - The Power Supplies shall require an input voltage of 90 ~ 264 VAC with a frequency of 47 ~ 63 Hz. 11.9.11 EXECUTION 11.9.11.1 INSTALLATION The installation should be done in accordance with the manufacturer’s recommendations. 11.9.11.2 Maintenance The maintenance procedures should be done in accordance with the manufacturer’s recommendations. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 112 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 12.0 TESTING AND DOCUMENTATIONS I. SYSTEM INSPECTION and CHECKOUT After the system installation has been completed, the entire system shall be checked out, inspected and functionally tested by qualified, trained personnel, in accordance with the manufacturer's recommended procedures and NFPA standards. A. All containers and distribution piping shall be checked for proper mounting and installation B. All electrical wiring shall be tested for proper connection, continuity and resistance to earth C. The complete system shall be functionally tested, in the presence of the owner or his representative, and all functions, including system and equipment interlocks, must be operational at least five (5) days prior to the final acceptance tests 1. Each detector shall be tested in accordance with the manufacturer's recommended procedures, and test values recorded 2. All system and equipment interlocks, such as door release devices, audible and visual devices, equipment shutdowns, local and remote alarms, etc. shall function as required and designed 3. Each control panel circuit shall be tested for trouble by inducing a trouble condition into the system II. TRAINING REQUIREMENTS Prior to final acceptance, the installing contractor shall provide operational training to each shift of the owners personnel. Each training session shall include control panel operation, manual and (optional) abort functions, trouble procedures, supervisory procedures, auxiliary functions and emergency procedures. III. OPERATION and MAINTENANCE Prior to final acceptance, the installing contractor shall provide complete operation and maintenance instruction manuals, four (4) copies for each system, to the owner. All aspects of system operation and maintenance shall be detailed, including piping isometrics, wiring diagrams of all circuits, a written description of the system design, sequence of operation and drawing illustrating control logic and equipment used in the system. Checklists and procedures for emergency situations, troubleshooting techniques, maintenance operations and procedures shall be included in the manual. IV. AS-BUILT DRAWINGS Upon completion of each system, the installing contractor shall provide four (4) copies of system "As-Built" drawings to the owner. The drawings shall show actual installation details including all equipment locations (i.e.: control panel, agent container, detectors, alarms, manuals and aborts, etc.) as well as piping and conduit routing details. Show all room or facilities modifications, including door and/or damper installations completed. One \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 113 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection (1) copy of reproducible engineering drawings shall be provided reflecting all actual installation details. V. ACCEPTANCE TESTS A. the time "As-Built" drawings and maintenance/operations manuals are submitted, the installing contractor shall submit a "Test Plan" describing procedures to be used to test the control system. The Test Plan shall include a step-by-step description of all tests to be performed and shall indicate the type and location of test apparatus to be employed. The tests shall demonstrate that the operational and installation requirements of this specification have been met. All tests shall be conducted in the presence of the owner and shall not be conducted until the Test Plan has been approved. B. The tests shall demonstrate that the entire control system functions as designed and intended. All circuits shall be tested: automatic actuation, solenoid and manual actuation, HVAC and power shutdowns, audible and visual alarm devices and manual override of abort functions. Supervision of all panel circuits, including AC power and battery power supplies, shall be tested and qualified. C. A room pressurization test shall be conducted, in each protected space, to determine the presence of openings which would affect the agent concentration levels. The test shall conducted using the Retro-Tec Corp. Door Fan system, or equivalent, with integrated computer program. All testing shall be in accordance with NFPA 2001, Appendix B. D. If room pressurization testing indicates that openings exist which would result in leakage and/or loss of the extinguishing agent, the installing contractor shall be responsible for coordinating the proper sealing of the protected space by the general contractor or his sub-contractor or agent. The general contractor shall be responsible for adequately sealing all protected space against agent loss or leakage. The installing contractor shall inspect all work to ascertain that the protected space have been adequately and properly sealed. THE SUPPRESSION SYSTEM INSTALLING CONTRACTOR SHALL BE RESPONSIBLE FOR THE SUCCESS OF THE ROOM PRESSURIZATION TESTS. If the first room pressurization test is not successful, in accordance with these specifications, the installing contractor shall direct the general contractor to determine, and correct, the cause of the test failure. The installing contractor shall conduct additional room pressurization tests, at no additional cost to the owner, until a successful test is obtained. Copies of successful test results shall be submitted to the owner for record. Upon acceptance by the owner, the completed system shall be placed into service. VI. SYSTEM INSPECTIONS A. The installing contractor shall provide two (2) inspections of each system, installed under this contract, during the one-year warranty period. The first inspection shall be at the six month interval, and the second inspection at the 12-month interval, after \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 114 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection system acceptance. Inspections shall be conducted in accordance with the manufacturer's guidelines and the recommendations of NFPA 2001. B. Documents certifying satisfactory system operation shall be submitted to the owner upon completion of each inspection. VII. WARRANTY All system components furnished and installed under this contract shall be warranted against defects in design, materials and workmanship for the full warranty period which is standard with the manufacturer, but in no case less than one (1) year from the date of system acceptance. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 115 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 13.0 ELECTRICAL WORKS IN ASSOCIATION WITH PLUMBING, SUPPRESSION SYSTEM AND FIRE PROTECTION SERVICES 13.1 GENERAL 13.2 SANITARY, FIRE a) This section covers the general requirements for electrical work to be installed under this Specification. a) The contractor shall supplyy and install all elctrical wiring, switchgear etc., necessary for the the complete, safe and satisfactory operation of the plant covered by the Specification. b) In case the permanent supply is not available, the Contractor shall be responsible for the supply and installation of all temporary power required for the operation of all fire fighting equipment, automatic alarm system etc., during the inspection period. c) All equipment provided shall be selected of ‘tropicalised’ designed for use in conditions up to 40C ambient air temperature and 100% relative humidity. d) All equipment, materials, workmanship and fittings shall comply with the appropriate BS or local Authorities ‘requirements as listed in the relevant paragraphs of this section, or an approved equivalent international standards. e) The electricity supply will be 400/230 Volt, 50 Hz, 3 phase, 4 wire. All equipment shall be designed to operate with a +- 10% voltage tolerance without a loss of rated output and frequency tolerance shall be +- 4%. f) All equipment shall be connected to ensure that the phases are balances to the requirements of the local Supply Authority. g) Any high voltage motor if required to consider to match with the contractor proposed equipment or required to ensure voltage dip during starting comply with the Local Supply Authority requirement. The contractor shall propose the detail design for the complete High Voltage Installation for Architect acceptance. The time and cost to complete the installation shall be included in the contract. SUBMISSION a. All technical submissions shall be accepted by the Architect prior to the respective stages of construction. b. As a minimum requirement, the submission shall include the following: a. Equipment submission with manufacturer’s data b. Sample submission c. Shop drawing of the cable routings showing the co-ordinated routing of cables, arrangement on cable trays, methods of fixing of cable trays and cables, tec. All conduits including concealed conduit routing drawings shall also be included. d. Cable test reports and PSB certification \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 116 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 13.3 e. Cable schedule indicate the follwing data include - Cable code and type installation method - Cable feed form and serve to - Cable route length and voltage drop - Cable capable and - Upstream protection breaker rating. The cable schedule shall be endorsed by the cable manufacturer. f. g. Calculation of the prospective short circuit current Full discrimination relay and circuit curves indicate relay setting and breaker selection shall be co-ordinate by the contractor and submit for clearance. The submission shall cover motor starting curve, both O/C and G/F protection up to equipment level and shall be endorsed by this contractor’s Installation Electrical LEW. REGULATIONS AND STATUTORY REQUIREMENTS a) The entire electrical installation shall be in accordance with the patent regulation and requirement of the local Authorities having jurisdiction. b) The requirements of the latest local Electrical Authority Standard shall be taken as the minimum standard for this installation. c) All eletrical work for the Mechanical Installation inside the fuel oil tank room shall be in accordance to BS 4345. d) All related British Standards Specification. 13.4 SWITCHBOARDS AND SWITCHBOARDS EQUIPMENT a) Provision shall be made within the factory built assemblies for the proper support and bracing of outgoing and incoming cables or busducts. b) Weatherproof cable glands and all necessary non – ferrous gland plates., etc. shall be provided for all cable entering or leaving the switchboards. Cable terminating end boxes shall be provided below the termination boxes. c) Busducts entries to the switchboard shall be liaised with busduct vendor for the exact position and phasing. d) All the Floorand Wall mount panel in the Electrical Motor Control Centre Room shall be IP 42 rating and all the Floor and Wall mount in the Mechanical Plant Room shall be IP 65 rating. e) Detail of Cable or busduct in ad out of the swicthboard shall take into consideration of the IP rating requirement as specified for the switchboard. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 117 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection f) 13.4.1 All control switches shall be of the rotary type of Santon, Kraus and Naimer or other approved manufacture. FLOOR STANDING MOTOR CONTROL PANELS 1. Control Panels shall be self-contained suitable for indoor service in a temperature of 450C, built up of enclosed compartments to preclude fault transference between sections of the switchboard. 2. Control Panels shall be arranged for the maximum safety of personnel. All power wiring and busbars shall be fully enclosed with isolating and insulation barriers and interlocks provided to endure maximum safeguards. All switches shall be lockable in either the ‘OFF’ or ‘ON’ position. 3. Control panels shall be of the floor standing type tested modular design, totally enclosed ‘deep front type’, consisting of dished front panels and doors built up on an approved substantial mild steel angle or channel frame with no cross-struts, and shall be fitted with removable rear and end panels in position with six fixing points. 4. All panels and doors shall be constructed of best quality, dead-flat mild steel plate not less than 2 mm thick. Neat cut outs shall be provided in dished panels to allow the exposure of circuit breaker toggles, and fuse switch operating handles and indicators only. The edges of all outlets and drilled holes shall be burr free. 5. Doors shall be sfittened and provided with gaskets and concealed non-ferrous door hinges. Door handles shall be chrome plated and incorporate a barrel type locking mechanism and shaft adjustment for increasing sealing pressure. 6. All switches shall be provided with mechanical interlocks to prevent any positive access to any equipment inside the cubicle when the switch is in the ‘ON’ position. 7. Dished panels shall be stiffened and held in place with chrome plated castle head nuts attached to fixed studs of not less than 10 mm nominal diameter. All fixing hardware shall be cadmium plated. 8. The removable rear panels shall be provided with a pair of handles for easy fixing/removal of the panels. 9. Provision shall be made for lifting cubicle switchboards. Eye bolts shall not be used when subjected to shear stresses. 10. Adequate provision and space shall be provided for bending and connecting cables, wich shall be separated from switchboard busbars. 11. All internal small wiring shall be PVC insulated, neatly, bunched and run on supporting cleats or in trunckings, colour coded and labelled or sleeved for identification. All switch-board small wiring is to terminate on labelled terminal boards or strips to which external connections are made. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 118 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 12. Insulators, including busbar supports, shall be non-hygroscopic and non-deteriorating. The use of fibrous materials, linseed oil, varnish, “Presspalin”, etc. is prohibited. 13. The contractor shall ensure that the overall power factor of the main switchboard is greater than 0.85 lagging at all operating conditions of the motors. The contractor shall be responsible for the supply and installation of power factor correction capacitor to improve the power factor to 0.85 lagging. 14. Low voltage switchboards shall be constructed to withstand a system fault level experience at location of installation with minimum 31 MVA at 400 Volt for 3 second and a short time Current of 43 KA for 3 second. Low voltage switchboards shall be designed to BS 5486:Part 1. From 3b, unless otherwise specified. 15. High voltage switchboards shall be constructed to withstand a system fault at location of installation with minimum 50 KA for 3 seconds and to IEC 298 and BS 5227. 16. Type test certificates, issued by an international reputable and independent testing authority such as PSB, certifying the circuit breaker, busbar and its enclosure shall be submitted for endorsement. 17. Ventilating water-proof louvers are to be provided on the sides and back and are to be of approved design with internal dust baffles. The consideration of Louvers shall consider the IP protection requirement to suit the location of installation. 18. Where ventilating fans are installed, a low level, filtered air intake shall be provided. The filter shall be removable from outside the switchboard. 19. Current transformers shall be to BS 3938 and mounted without reduction of busbars or connections and arranged from ease of removal. Explosion flaps prevent plates and doors being shot off at a high short circuit level. The board shall be painted with HighSolid channel, acrylic/polyester, electrostatic spray oven baked. 13.4.2 WALL MOUNTED PANEL a) Wall mounted panel with an appropriate rating and number of circuits shall be provided to supply power to plant located throughout the building. b) Panel enclosures are to be fabricated from galvanised sheet metal and finished in enamel of a colour to the aprroval of the Architect. Inside the enclosure door, a circuit chart indicating the number of ways, location of equipment, loading and protection rating shall be fixed. c) All wiring terminations, busbars, and live parts within the panel board shall be adequately shrouded and an insulating front shield of minimum 1.6 mm thickness shall be provided to completely screen the unit’s interior. Only the operating dolly and insulated sorround shall project through the shield. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 119 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection d) The units are to be provided with sufficient wiring ways for outgoing circuits at both the top and bottom of the board. 13.4.3 BUSBARS a) All busbars shall be made of hard drawn high conductivity copper to BS 1433 and shall be electro-tinned. Construction, making and arrangement of the busbars, connections and auxiliary wiring shall be to BS 5486:Part 1. b) Busbars shall be adequately rated and supported by porcelain or moulded insulators spaced at suitable interval the complete assembly being capable of withstanding the maximum mechanical stress to which it may be subjected ubder fault conditions. Full size neutral bars shall be provided. c) Busbars shall be so arranged that all conductors can be brought onto the bars without undue bending. d) Conductors between the busbars and fuse switches or isolators are to be high conductivity copper bar or cable, having a current rating of not less than that of the switches to which they are connected. The conductors are to be insulated with PVC sheathing and colour coded for phase identification. e) Removable bolted links shall be provided for the accomodation of current transformers for metering and protection facilities without affecting the mechanical and electrical properties of the busbars as a whole. f) 13.4.4 A full length earthing busbar shall be mounted in the switchboard in an approved location, for the connection of low voltage earthng conductors. All bolts shall be tightened with an even tension. Approved spring washer with cadmium plated high tensile steel bolts with BSF thread and having approved cadmium plated lock nuts shall be used. AIR CIRCUIT BREAKERS a) Air circuit breakers shall comply with and be tested to BS 4752:Part1. b) Air circuit breakers shall be triple pole units with an interrupting capacity of not less than the short circuit level experience with minimum 31 MVA at 415 Volt for 3 sec. c) Unless noted otherwise on the drawings, ACB’s shall be withdrawable, mounted on a guide rail framework assembly including rear isolation contacts which are supplied by the circuit breaker manufacturer. d) The racking gear shall be fully interlocked to prevent withdrawal and re-engagement of the breaker with its contacts closed. The racking gear shall be three clear positions – sevice, test, with main contacts isolated, and fully isolated. e) When the ACB is withdrawn, all live parts shall be protected by shrouding or lockable shutters. The ACB shall be closely by a stored energy device, operating in two stages. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 120 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Initially, the mechanism is charged either electrically or mechanically, and then the device is released to close the breaker contacts. The operating mechanism shall be trip-free. f) Overcurrent, short circuit and eearth fault protection shall be provided with current transformers, operating relays arranged to provide inverse time delay characteristics. g) Looking shall be provided to fix the circuit breaker in the disengaged position. h) Non-withdrawable air circuit breakers shall be fitted with directacting overcurrent protection. In other respects, they shall be similar to the withdrawable units. 13.4.5 MOULDED CASE CIRCUIT BREAKERS (MCCB’S) a) All moulded case circuit breakers shall confirm to BS 4752:part 1, 1977, and be of one, approved, make throughout the project. The body and base of the units are to be moulded and the units are to be sealed after assembly. b) The load handling contacts are to be silver/tungsten and the contacts and operating mechanism so designed as to give a wiping action both at make and break. c) The breaker operating mechanism is to be of the trip-free type so designed to prevent the load handling contacts from closing on a fault. d) The toggle handle shall open and close all poles of a multiple circuit breaker simultaneously. A fault on one pole shall open all poles. e) The MCCB’s shall have a fault level capacity at location of installation with minimum 30 MVA at 400 Volt. f) Circuit protection against overload and fault conditions is to be provided by means of a thermal-magnetic devicee designed to give thermal operation on overload and magnetic operation under fault conditions. g) Position of the breaker operating dolly are to be clearly indicated for ‘ON’ and ‘OFF’. h) MCCB’s shall be suitable for use at 40 degree C. 13.4.6 MINIATURE CIRCUIT BREAKER a) Single pole or triple pole miniature sicrcuit breakers 9MCB) are to be used for circuit protection. b) All MCB’s shall conform to BS 4752 Part 1. The bodyand abse of the units are to be moulded bakelite or similar material and the units are to be sealed after assembly. c) The load handling contacts are to be silver/tungsten, and the contacts and operating mechanism are so designed as to give a iping action both at make and break. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 121 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection d) The breaker operating mechanism is to be th etrip free type. A thermal-magnetic time tripping mechanism is to be included for circuit protection against overload and short circuit. Short circuit of this MCB shall not less than fault level experience at location of installation with minimum 9kA. e) Tripping characteristic of MCB’s shall be type 2 or 3 for 5A and 10A and type 2 for 15A or above. 13.4.7 FUSED SWITCHGEAR AND ISOLATORS a) All fused switchgear and isolators whether mounted in a cubicle type switchboard or separately mounted shall be heavy duty type conforming to the requirements of BS 5419:1977. All contacts are to be fully shrouded and are to have a breaking capacity on manual operation as required by British Standards. b) Operation of fuse switches shall be independent of the operator’s control, with a quick make/quick beak action. c) The fuse links for fuse-switched and switch fuses are to be high rupturing capacity, cartridge type conforming to BS 88 and ASTA certified for Class Q1 fusing factor. d) Fuse-switches and isolators mounted in cubicle type switch-boards are to be enclosed in separate sheet metal compartments, and mechanical interlocks are to be provided between the cubicle doors and the switch operating mechanism, so arranged that the cubicle door may not be opened with the switch on the ‘ON’ position. Similiarly it shall not be possible to close the switch with the cubicle door open, except that provision shall be made within the cubicle for authorised persons to defeat the mechanical interlock for test purposes, and close the switch with the door in the open position. e) The ‘ON’ and ‘OFF’ positions of all switches and isolators shall be celarly indicated by a mechanical flag indicator or similar device. f) In TP&N fuse-switch units, bolted neutral links are to be fitted. For single pole and neutral fuse-switches and isolating switches, the netral conductor is to be taken through a bolted link. 13.4.8 FUSES a) All fuses shall be HRC cartridge type complying with BS 88 and having a fusing factor of Class Q1 and a category of duty AC 46. b) Fuse carriers and holders, if required, shall be constructed of ceramic or HD phenolic moulding to BS 771/159. 13.4.9 CONTACTORS Contactors or control relays are to be single or triple pole, conforming to BS 5424: Part 1:1977. The rating shall be as noted on the drawing but in any case, shall not be less than \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 122 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 10A or the rating of the circuit, whichever is the greater. All ratings shall be “continuous” and all contacts shall be silver plate. Contactor coils shall operate from a 230 Volt AC Electricity Supply. 13.4.10 MEASURING INSTRUMENTS AND PROTECTION RELAYS a) All ammeters and voltmeters for use in conjuction with switchgear are to be of the moving iron pattern to comply with BS 89 for industrial accuracy. b) Unless otherwise specified, all meters are to be 100 mm dial square fluch pattern with quadrant scales. c) Ammeters with scale deflections greater than 100A installed in the switchboard shall include all phase and neutral current. d) All ammeters shall be a continuous overload capacity of 120% of the upper limit of the scale for two hours. Each ammeter shall be provided with an adjustable red index pointer to indicate the normal full load current. e) Ammeters shall be provided for motors of 5.5 kW or larger and they shall be capable of starting current and shall have a compressed overload scale for this purpose. Motor current reading shall be provided on one phase only. f) Voltmeters shall be of accuracy Class 2 and have expanded scales. g) Voltmeters shall be connected to the incoming side of the power supply thorugh 6 Ampere HRC fuses and links. h) Mechanical zero adjustment shall be provided for voltmeters and ammeters by means of a screw slot at the fave of the meters. i) Energy and maximum demand meters shall be installed as specified. Energy meters shall provide a direct, single, digital reading, without the need to apply multiplication factors. Data shall be transmitted to MBS system as required. j) Earth fault and overcurrent protection realys shall be to BS 142, located as specified in the drawings or as required to complete the installation. k) Current transformers for measurement and protection shall be of ring pattern to BS 3938:1973 (1982), clamped on readily removable, bolted copper links with accessible terminals. l) Selector switches of the rotary type shall be provided to enable all phase current and all phase and phase to neutral voltages to be read. m) Instrument fuses shall be mounted on the panel adjacent to their associated instruments. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 123 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection n) All instrument and indicating lamp wiring behind hinged front panels shall be protected by clear acrylic sheets. o) The arrangement, scale deflections and ratios of all instruments and relays shall be approved prior to assembly of the associated switchboard. 13.4.11 LABELLING a) All items of equipment on the switchboard shall be lablled to indicated function with black traffolyte labels and white engraved lettering securely fixed with chrome plated screws. Lettering shall be a t least 10 mm high. Labels to all switches, isolators and the like shall indicate the supply and cable details. All labels shall be approved prior to engraving. b) The use of adhesive labels will not be permitted. All electrical equipment not mounted on the switchboard shall also be labelled as specified above. c) Two set of Label shall be included in the contract to allow any amendment of the label as directed on site. 13.4.12 TIME SWITCHES Time switches shall be of approved manufacture and shall incorporate the switching actions required. Drive shall be by synchronous motor with a twelve hour spring reserve in case of power failure. An override switch shall be provided. 13.4.13 TIME DELAYS Time delays shall be provided to prevent the simultaneous starting of any two motors above 3.5 kW and to prevent short cycling of automatically controlled motors. 13.4.14 HOUR RUN METER a) Hour run meters shall be provided for motors of 55 kW and above. b) Hour run meters shall be flush mounted and of the five digit type. They shall be suitable for 230 Volt to 50 Hz supply. A key lockable mechanical reset push button shall be provided. 13.4.15 CONTROL SWITCHES a) All control switches shall be of the rotary type of Santon, Kraus and Naimer or other approved manufacture. b) Each switch shall be panel mounted and engravedto clearly indicated the equipment controlled or function of the switch. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 124 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 13.4.16 INDICATING LAMPS a) Indicating lamps shall be individual flush mounted units. Lamps shall have chromium plated and polished solid brass body and ring with metallic threaded section and shall be circular in shape of approximately 20 mm diameter. b) Indicating lamps shall be of 24V and rated to withstand not less than 20% continuous over-voltage. c) Lamps shall be well ventilated and the design shall permit removal of lamp glasses and bulbs from the front of the unit without the need of any special tool. d) Indicating lamps shall be colour coded as follows : i) Green Motor running, circuit breaker ON; ii) Amber Supply available iii) White Valve open, trip circuit breaker iv) Red Motor tripped, circuit breaker OFF v) Blue Valve closed e) Control circuit shall be of 24V supply. 13.4.17 PUSH BUTTON SWITCHES a) Push button switches shall comply with and be tested and certified to BS 9564. Electrical ratings shall be 500V AC or 250V DC as appropriate. Push buttons for alarm duty shall be minimum of 2 Amp rated and that for control duty 10 Amp rated. b) Push buttons shall be individual flush mounted units with metallic chromium palted and polished solid brass body and ring, circular in shape and approximately 20 mm diameter. c) Unless specified otherwise, push buttons shall be colour coded as follows : 1. Green Start motor 2. White Open valve 3. Red Stop motor 4. Blue Close valve 5. Black Reset protection/alarm, lamp test; 6. Yellow Accept alarm 13.4.18 PUSH BUTTON SWITCHES All metal work associated with the switchboard installation not forming part of a phase or neutral circuit shall be bonded together and shall be solidly and effectively earthed through the supply provided by others. 13.4.19 CABLING A Cabling zone clear of busbars, fused switch and circuit breaker chambers shall be provided in such a manner to give minimum difficulty in connecting main cables entering the \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 125 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection switchboard for connection to fused switch units or circuits breakers. The cabling zone shall be fully isolated from any live metal part so that future cabling and alterations can be carried out in complete safety without the necessity of shutting down the complete switchboard. 13.4.20 TERMINAL BLOCKS a) Terminal block for control wiring shall be rated not less 20 Amp. Installation displacement push-in type terminal shall be used. b) Terminal blocks shall have esily removable copper links to short circuit adjacent terminals or shall be fitted with suitable fuse/fuse holder where required. Pinch screw type terminal blocks will not be acceptable. c) Cables having the same number shall be terminated at adjacent terminals and connected by means of cable links at the terminal block. The incoming cable cores shall be terminated at the lower or outer side of the block, and the outgoing cable cores at the upper or inner side of the terminal block, and cable links on any free side. d) Terminal blocks at different voltage, shall be segregrated into groups, distinctively lablled and provided with permanent rigid barriers. Terminals in groups shall have separate noncomubustible transparent palstic covers minimum 25 mm gap shall be provided between terminal blocks of different volatge group. Terminal blocks of Extra Low Voltage shall label with “Extra Low Voltages, No Main Supply” e) 20% spare terminals shall be provided on each terminal block. 13.4.21 WIRING DIAGRAM a) Prepare construction layout and functional wiring diagrams of all switchboards, which shall be approved prior to commencement of any work thereof. b) The wiring diagrams shall show control circuits separate from main circuits and shall indicate the size of each conductor and the colour, number and/or terminal connection designation of each control conductor. c) Switchboard drawings shall include a schedule of all equipment mounted therein, including make, model, and where applicable, fuse rating and set point of all variable adjustorss. d) Circuit diagrams shall be mounted near the switchboard in an approved location and shall be covered with either glass or clear perspex sheet not less than 3 mm thick. 13.4.22 LABELLING All items of equipment in switchboard shall be labelled to indicate function with white Traffolyte labels with black engraved lettering securely fixed with chrome plate screws. The use of adhesive labels will not be permitted. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 126 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection All contactors, switches and other similar electrical switchgear not mounted on switchboard shall also be labelled as specified above. The bottom section shall contain all contactors, fuses, transformers, relays and other associated equipment mounted on insulated panels. Switchboard shall be provided with hinged lockable access doors with mechanically retained gasket. The construction shall permit the removal of doors when opened for complete service access. All exterior door fittings shall be chrome plated. Internal insulated panels shall be Zelemeite or other equivalent material. All cables shall be brought to numbered terminals. All items of equipment shall be labelled with suitably engraved Traffolyte labels attached as per this specification. All cables shall be fitted with full circle cable markers at each end of every wire and numbered according to wiring diagrams. 13.4.23 INTERFACING CONNECTION Provide relays in the mechanical services switchboard for connection of fire services signal cabling for control of mechanical plant in fire mode. Final connection of the cabling to the mechanical switchboard shall be by the Fire Alarm Contractor. All control functions for Fire Mode operation shall be hard wired. Flow switches shall be supplied by the Controls contractor. Plant shall automatically reset after removal of the fire signals. Provide a red indicating light on each switchboard to show if the plant is operating in fire mode. Refer to ‘Automatic Control Systems’ section of this specification for details of the control strategy. 13.4.24 GENERAL REQUIREMENTS The contractor shall ensure that the switchboards ordered can be accommodated (together with the control cubicles) in the space provided. A rubber insulating mat shall be placed in front of the switchboard for its entire length. 13.5 MCB DISTRIBUTION BOARDS a) Miniature circuit breaker distribution boards are to be provided to serve circuits as indicated in the drawings. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 127 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection b) All wiring terminations and busbars within distribution boards shall be shrouded and an insulating front shield of a flame retardant type, minimum 1.6 mm thickness, shall be provided to completely screen the distribution unit interior. Only the MCB operating dolly and insulated sorround shall project through the shield. c) Neutral bars are to be of approved cross sectional area, mounted on insulators and drilled to receive circuit wiring. Clamping screws are to be provided for each circuit way. Screws are to be brass with round heads. d) A link of approved cross section shall be provided in the neutral bar between the incoming neutral and the final circuit neutral conductors. e) Distribution board enclosures are to be galvanised sheet metal constructed and finished en enamel of a colour to approval. The sheet metal for the enclosure and the door shall be not less than 1.2 mm thick. Hinged enclosure doors are to be fitted with ball catch locks. f) Space shall be provided for the future accommodation for 20% additional circuit breakers in all distribution boards. All necessary busbars, studs and neutral bar ways shall be allowed. g) Wiring schedules shall be provided and installed inside a clear plastic envelope on the inside of distribution board doors, giving the following information : - Distribution board designation; Rating of all circuit breakers; Size of all cables; Type and location of circuit load 13.6 CABLING 13.6.1 PVC INSULATED ARMOURED COPPER CABLE a) Cables of this type are to be 600/1000 Volt grade complying to BS 6346:1969 with each conductor of the same cross sectional area. b) PVC insulated and colour coded cores shall be sheathed with PVC which shall serve as a bedding for galvanished single steel wire armouring. The armouring shall be covered with an outer PVC sheath. c) Cables shall be terminated in a gland fitted with an armour clamp. The glan body shall be provided with an internal conial seating to receive the armour wires ensuring that the armour wires are tightly clamped between the armour cone and conical armour seating. d) The minimum bending radius for power cables shall be eight times the overall cable diameter. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 128 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection e) When cables are run on a wall they shall be cleated at distances not exceeding 1 metre. 13.6.2 PVC INSULATED COPPER CABLES PVC insulated copper cables shall comply with BS 6004:1975. Cables are to be 600/1000 or 250 Volt grade depending on size. 13.6.3 FIRE RESISTANT CABLES (FRC) FR Cable shall be of fire resistance complying IEC 331, IEE 383 and BS 4066 similar to HUBER & SUHNER RADOX or approved equivalent. Fire resistant cables shall comply with Fire and Mechanical Tests categories C, W and Z to BS6387. FR cable shall be provided for all Emergency use installation to FSB requirement. 13.6.4 FIRE RETARTDANT CABLE (FRCC) (N/A) Fire retardant, Low smoke zero halogen cable to IEC 754 Part 1 and IEC 332 Part 1 & 3 requirement shall be provided for all cables in open tray/ladder inside air plenum or inside false ceiling and as required by FSB copy for the location of installation 13.6.5 CABLING FIRE ALARM The cables shall Fire Resistance Cable (FRC). The conductor shall annealed copper, one strand or approved equivalent shall referred to Standard BS 6387 with category CWZ. 1. Network cabling from MFACP to MFACP are fire resistance cable (FRC STP AWG # 18, 2 pair. 2. Installation cable to detector shall Fire Resistance Cable (FRC) STP AWG #18, 1 pair in PVC High impact conduit Ø 3/4 3. Installation cable to flow switch, tamper switch, stair pressurized fan & others equipment shall fire resistance cable (FRC) 2 x 1,5 mm2 in PVC High impact conduit Ø 3/4 4. Installation cable to manual push button alarm bell and flasher lamp shall Fire Resistance Cable (FRC) 2 x 1,5 mm2 in PVC High impact conduit Ø 3/4 5. Installation cable to intercom using fire resistance cable (FRC), STP AWG#18, 1 pair in PVC High impact conduit Ø ¾ 6. Installation Cabling for looping shall fire resistance cable (FRC) STP #18AWG 1 pair & fire resistance cable (FRC) 2 x 1,5 mm2 \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 129 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 13.7 WIRING a) All wirings, unless otherwise specified, shall be PVC insulated and heathered or PVC insulated of approved manufacture conforming to BS 6004. “PVC insulated cables (non armoured) for electrical power and lighting”. Only cables which have passed PSB’s type test and have PUB approval shall be used. It shall have the manufacture’s identification clearly marked on it. b) All wirings shall be so selected to ensure that the current carrying capacity is suffecient and the voltage drop shall not be exceeded the requirements of the Local Electrical Authority. c) The following cable code shall be stricly maintained : i) Red phase a. Yellow phase b. Blue Phase c. Neutral d. Earth e. Controls - Red Yellow Blue Black Yellow/Green Strip (or if not available, use Green) Any suitable colour combination d) All wiring shall be carried out on the loop-in system. For conduit wiring systems, wiring shall be drawn into the cunduits after the whole of the conduit installation has been completed. No joins or connectors will be allowed in any such cables, except that connectors may be used in accesible positions within lighting fittings or device out let boxes. e) Cable shall be system cable shall be tinned copper lugs recommended by the cable manufacturers. f) The fire alarm system cable shall be tinned copper conductors of not less than 1.5 mm2 cross sectional area. g) All small wiring shall be colour coded to acceptable standard and be identified by moulded ferrules or sleeves both at the terminal strips and at the remote ends. Wiring for one primary circuit shll be run separately from another. It shall be neatly cleated and bunched according to their function for easy identification. Each wire shall be terminated with tinned approved crimped lugs. h) The maximum number of cables that may be accommodated in a given size of conduit or trunking is not to exceed the requirement in SCCP5. i) Wherever any electrical wiring, riser, conduit, cable trays and trunking penetrate the fire wall or floor slab, a fire resistance caulking of the same fire resistance period of the adjacent building structure shall be provided. Such caulking shall be of dry construction, easy for future addition of cables and making good, of materials accepted for electrical installation work and approved by the local authorities as a fire stopping material. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 130 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection j) Busbars, busbar connections and bare conductors shall comply with the requirements of IEC 439 with regards to current – carrying capacity and limits of temperature. k) All FR cables shall be install in hot dipped galvanised iron conduit or MS trunking or cable tray supported on walls, ceiling or structural steelwork. l) Cables in trunking or cable tray shall be laid flat and clipped together insets with brass clips or saddles. m) No surface mounted cable is allowed. 13.8 CONDUIT All wiring other than that run in approved metal ducts shall be enclosed in galvanized Class `B' metal conduit or as noted on the drawings. All joints/couplings shall be threaded. Sufficient accessible junction boxes are to be provided for the purposes of drawing-in cables. Conduit shall be installed so as to enable cables to be "drawn-in" after erection and boxes to be provided for this purpose. Inspection type fittings are not acceptable as draw-in points. Conduit cast in to concrete or chased into brick/block work to be rigid PVC conduit. Conduit cast into concrete shall be high impact type PVC. ii. All conduit/trunking/cable tray shall be made of galvanised steel and shall be adequately sized to house the cables with at least 20% spare capacity. iii. All conduits shall be heavy gauge galvanised steel complying with BS 4568:Part I & II Class 4. No conduits shall be less than 20 mm nominal diameter. iv. Unless otherwise approved by Architect/Engineers conduit shall be concealed in concrete as construction proceeds, and so arranged as to drain naturally to outlet boxes. Sealing caps shall be placed on all conduits before concrte pouring commences to ensure no water enters the conduit. Expansion couplings shall be fitted at all buliding enters the conduit. Expansion couplings shall be fitted at all building expansion joints. v. Surface conduits shall in no circumstances be fixed to floor slabs. vi. All conduit system are to be installed fully in accordance with the requirements of the local code. vii. All conduits shall be swabbed through to clean all dirt, free from burrs and internal roughness. The screw connections shall be made in such a manner as to ensure good electrical and mechanical conductivity throughout assembled and be earthed with heavy capper wiring. All conduits not cast in concrete shall be securely fixed by means of hot-dip galvanised saddles with spacer at not more not 1 m centres for 20 mm conduits and 1.2 m centres for larger diameter conduits. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 131 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 13.8.1 viii. Manufacturer’s standard fittings all be used for bends, angles, tees, intersections and other non-standard runs. Distortion of conduits due to bending is not acceptable. ix. Conduit terminations at switches, distribution boards etc, shall be made with copuler and male brass bushes. x. Connections to motors and other equipment subject to vibration shall be made with a length of heavy water tight PVC coated metallic flexible conduit set into suitable screwed conduit adapters. The metal frame or other parts of the equipment so connected shall be earthed through the conduit system independently of the flexible conduit. xi. Unless otherwise specified or accepted by the Architect, all conduits below ceiling line shall be concealed in walls, partitions or floor. xii. Runs between drwa-in boxes are not to have more than two right angle bends or their equivalent and the length of such runs shall be limited to 12 m to permit easy drawingin of cables. xiii. xiv. Flexible conduit shall be used for final connections to equipment subject to vibration. Flexible steel conduit nd solid type adapters shall comply with BS 731 part 1. The conduit shall be watertight with the provision of separate earth wire enclosed for earth continuity. All flexible steel conduit shall be PVC sheathed. No flexible steel conduit longer than 3 m is allowed. xv. Make good any damage to the finish of all conduits, including threads cut at side,, by painting damaged areas with two coats of alumunium primer paint. CONDUIT BOXES a) b) c) d) e) All conduit junction boxes are to be hot-dip galvanised malleable iron (surface mounted) or mild steel (concealed) and of standard pattern. Standard pattern boxes are to be used with conduits up to and including 25 mm diameter. Rectangular pattern boxes are to be used for conduits of 25 mm diameter and larger. For the drawing-in of cables, standard pattern through boxes are to be used. All conduit boxes are to be galvanised finish. Adapter boxes are to be of galvanised mild steel not less than 3 mm thick. Boxes are to be not less than 50 mm deep and of such dimensions as will enable the largest size cable for which the conduit run is suitable to be drawn in without excessive bending of the cables. Covers of approved material with fixing screws are to be provided. All boxes are to be drilled for holes according to the conduit entries required. All conduit entries to adapter boxes, outlet boxes and switchgear are to be made with couplings and hexagonal male bushes. The protective coating of the boxes sjhall be heavy both inside and outside in accordance with BS 4662. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 132 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 13.9 CABLE TRUNKING a) Metal trunking shall comply with BS 4678 and shall be manufactured in minimum lengths of 2 m from 1.5 mm thick zinc sprayed sheet steel finished with rust resisting primer and sprayed two coats enamel paint to colour agrred by Architect. Covers are to be held in place by screws. Trunking are to be terminated with end flanges bolted directly to switch or distribution boards. Connecting pieces are to be used and bolted wirh cadmium plated mushroom head steel screws, nuts and shake-proof washers. Each joint is to have a copper link to ensure electronical continuity. b) Condut entries to trunking shall be made with couplings and brass male bushes. Knockouts will not be required and trunkings may be drilled on site. c) Trunkings shall not contain more cable than allowed by the space factors described in the local electrical Authority. Each joint shall have a copper bond bolted to each adjacent trunking to ensure electrical contunity. All frayed and sharp edges shall be removed from trunking before installation. d) e) Conduit entry to trunking shall be by coupling and male bush. Knock-outs shall not be provided, and trucking shall be drilled on site. f) Where trunking crosses expansion joints, a trunking system which will allow for expansion and maintain earth continuity shall be used. The system used shall be endorsed by the Architect/Engineer prior to manufacture. g) Where the trunking passes through floors or fire compartments, fire resisting barriers shall be provided both internally and externally. h) All supports and hangers shall be of hot-dipped galvanished mild steel construction to BS 729:1971 Part 1 with minimum coating thcikness of 85 and 210 for indoor and outdoor installation respectively. All bolts and nuts shall be electroplated with zinc or cadmium to BS 3382:parts 1 and 2 with minimum plating thickness of 25. Unless all the trunking to be continuously interlinked, a 25 mm x 2.5 mm thick copper tape shall run continuously throughout the whole length of trunking to provide earth continuity. i) 13.10 CABLE TRAYS a) Cable trays are to be of perforated pattern 1.6 mm minimum mild steel with returned edges galvanished overall conforming to BS 1449 Part 1 and accessories to BS 729. b) Trays shall be supported form the soffit of structural slabs and beams by mild steel rods not less than 6 mm diameter and underslung mild steel angles, or alternatively, supported on steel angle brackets secured to walls. The former method shall be preferred where practicable. All supports and hangers shall be hot-dipped galvanised with bolts and nuts electripalted as described in “Cable Trunking”. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 133 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 13.11 c) Cable tray shall have an upturned flanged both sides of 20 mm deep and complete with standard radius bends etc., an fixing brackets fabricated from hot-dip galvanised angle steel, channels etc. d) Tray shall be supported at not more than 1 m intervals. e) For cable tray taht are exposed to the weather, a hot dip galvanised covers of 1.5 mm gauge steel, flush fixing type with gasket, shalll be installed on top of the tray. f) Copper earth link bar shall be fixed at every joint of the cable tray run. MOTORS 13.11.1 GENERAL a) b) c) d) All motors, unless otherwise specified on the Drawing, shall be totally enclosed fan cooled (TEFC) to IP 54, squirrel cage induction type conforming to either IEC 34-1 and IEC 85 or BS 5000 and BS 2757 with minimum Class F insulation. All varnishes and impregnate used shall be inorganic and suitable for tropical service. Bearings shall be so selected for its duty and shall be housed in dust tight enclosure with efficient shaft seals to prevent dust ingress and escape of grease, and be equipped with grease niplles and relief plugs. Terminal boxes shall be of hot-dip galvanised cast iron and be provided with glands to accept conduit. Terminal blocks shall be of high quality insulating materials and be capable to support incoming cables. All motors shall be so selected to have at least 115% of the power rating above the design duty point. It shall also operate with power factor of not less than 0.85 at full load, otherwise, power factor correction capacitors shall be provided. Motors shall be capable of operating continuously at rated output at any frequency between 48 and 52 Hz and at any voltage within 10 percent of the nominal value. Motors shall be tropicalised to BS 1156 with minimum 1 mega ohm insulation resistance. e) Where motors are required to be installed in outdoor locations, they shall be fully weatherproof and with IP 65. f) Whre motors are installed in humid pump rooms aor rated in excess of 5.5 kW, they shall be fitted with anti-condesation heathers of single switch “OFF” automatically when the motor is started and switch “OFF” automatically when the motor is started and switch “ON” automatically when the motor is stopped. g) Single phase motors shall be either repulsion or capacitor start and induction run. Motors rated 2.3 kW and above shall be operated by three phase supply. Those exceeding 2.3 kW shall be provide with reduced voltage starting while those less then 2.3 kW shall be direct on the start. Softstarter shall be provided for pumps exceeds 30 kW or above and for all up feed transfer pumps. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 134 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection h) Alll motors shall have an isolating switch adjacent to and within sight of the motor. The swicth shall be such that all conductors to the motor are isolated in one operation. i) The drive selected for any machine shall be the type recommended by the manufacturer of the driven machine and subject to approval. All drives shall be fitted with safety guards. j) For multi-windin motors there shall be no way that the motor isolating swicth can be operated whereby any winding may be energised whilst another winding is isolated. k) Terminal boxes shall be of such dimensions as will ensure access to the terminals and allow room for the supply leads. l) Each box shall be fitted for the normal bottom or top cable entry. With exception of motors ith ratings less than 1kW, all boxes shall be capable of being turned to a further 3 positios, 90 degrees apart without affecting the terminal base or terminals. m) Standardise frame sizes for all applications so that the minimum ractical number of motors need be carried as spares. Ensure that motors of different frame sizes spared by a single motor be provided with adapter plates, oversize couplings, oversize terminal boxes, standard keyways etc, to facilitate replacement. n) Motors of particular type or application shall be of the same manufcaturer. o) Motor above 7.5 kW shall be provided with suitably sized tinned brass cable sockets. Sockets shall be in accordance with BS 91. The type of cable terminations shall be as shown on the drawings. Three phase motors shall be fitted with separate earthing terminals. p) q) All motors shall be provided with the name plates showing all the techinical data, such as : model Number, electrical characteristic, weight etc. r) Motors up to an including 3.7 kW shall be fitted with ball bearings at both ends. Larger motors shall be fitted with roller or deep prove ball bearings. Motors operating with vertical shafts shall be equipped with bearings designed to counter unbalanced end thrust. Motors shall be have the same synchoronous speed as the pump. s) Noise level shall meet Part 51 of BS 4999. Motor of ventilation supply fans of the axial type making in 100% outside air be suitable for operation in atmosphere of up to 95% PH and down to 4 degree C dry bulb temperature. t) Motor and complete installation shall be design and selected to suit the location of installation. Flame proof for Hazardous areas and IP 65 or Wet Area shall be provided as required. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 135 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 13.11.2 MOTOR INSTALLATION a) Install motors as required by the driven equipment. Provide lifting equipment for the installation of motors. Any additional steel works, supporting brackets and members which are required for the motor installation shall be provided. b) All motors shall opearte without vibration. The motors shall be mounted on a common bedplate with the machine being driven. Frames and supports for motors shall be accurately set and levelled. c) Provide holding down bolts required fo the fixing of motors. Should the bolts be required to be sunk in concrete bases the supply of all necessary details and fixing shall be supplied in adequate time. d) For each motor, an emergency stop push-button shall be provided. This button shall be positioned immediately vicinity of the associated motor drive. The exact locations shall be agreed with the engineer on site. e) No motor shall be installed in a position where sorrounding plant or building work would obstruct the necessary periodacally testing, cleaning and maintenance. f) All rotating parts of motors shall be properly guarded. 13.11.3 MOTOR STARTERS a) Motor starter/contactors shall be furnished and installed for mounting in the control panels. The type of starter shall be compatible with the type and size of motor protection, as indicated. Contactors shall be non-sticking when de-energised, chatter free, operated without discernible noise and be suitable for 230 Bolt 50 Hz AC control opeation. b) Contactors used in starters shall be of Class A3 type provided with silver alloy contacts. Auxiliary contacts shall be provided to facilitate the conncetions of interlocks, status indication and auxiliary controls. Unless explicity described, a minimum of one normally open and one normallyy closed contact shall be provided. c) Starter for other purposes shall be completed with protection incorporating the following features: Overload protection in each supply phase adjustable from 80 to 120% of full rated load. Manual reset Phase failure and overload protection Ambient temperature compensation An auxiliary contact to signal an overload condition d) The voltage rating of the coil shall be such as to be compatible with other components in the control circuit. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 136 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection e) Contactors or complete starters not mounted in switchboard shall be contained in metal or approved plastic enclosures with conduit entries, shrouded “stop” and “starts” push buttons and a manual “reset” button, which may be combined with the “stop” button. f) Where not indicated, motor starters shall generally be of the follwoing types : 2kW or below - DOL Starters 2-30 kW - Star-delta starters (closed transition) Above 3 kW - Soft starters g) All starters for transfer pumps shall be softstarter type unless otherwise stated. h) All motors starter provided shall be heavy duty and suitable for the pump starting arrangement intended. 13.12 TYPES OF STARTER 13.12.1 DOL STARTER a) DOL Starters shall incorporate a direct switching electro-magnetic contractor together with overload protection relay, suitable for starting the motors “direct-on-line”. b) Contractors in DOL starters controlling motors on fans, circulating pumps and similar items of equipment which run continuously during the period of operation, shall have the following minimum rating. Duty of 8 hour utilization Category AC 3, Mechanical Endurance Class 0.01. c) In all other cases, starters with a minimum rating intermittent duty Class 0.1, utilization Category AC 3, Mechanical Endurance Class 0.3 shall be used. 13.12.2 CLOSED TRANSITION “STAR-DELTA” STARTERS (CT.SD) a) Closed transition (star-delta) starters shall be approved type and manufacture and shall be capable of starting the motor from stopped to full load speed without interruption and in such a manner that the torque developed by the motor increases as uniformly as practicable during the whole starting sequence. b) The starter shall include the following equipment : 1. No-volt coils with provision for external stop controls. 2. Positive indication of the starter operation 3. A suitably rated transition resistance bank such as to allow approximately full load supply current when in circuit prior to opening of the star point. The short time rating of the resistors shall also be considered in relation to the length of their “in circuit” requirement. 4. A transition Contractor suitably rated to facilitate connection of the resistance bank during the transition period. 5. Star and delta configuration contactors suitably rated for the mechanically and electrically interlocked to prevent simultaneous operation. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 137 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 6. One (1) triple pole overload relay. 7. One (1) approved time delay relay, with at least 0-30 second adjustable time delay period, to control the star to delta switching contractors. 8. Any additional auxiliary contracts and timers, required for the transition sequencing operation. 13.12.3 AUTO-TRANSFORMER STARTERS (CT.AT) a) Auto-transformer starters shall be of acceptable type and manufacture and shall be capable of starting the motor from stopped to full load speed without interruption and in such a manner that the torque development be the motor increases as uniformly as practicable during the whole starting sequence. b) Auto-transformer starters shall be of the type having standard tapping and Komdorfer connections, and shall include the following equipment : a. One (1) contactor operated auto-transformer type starter tapped 50 percent, 65 percent and 80 percent and comprising mainline contactor, run contactor and auto transformer star point contactor, all complete with the necessary auxiliary relays suitably rated for the motor. b. One (10 triple pole overload relay) c) One (1) set of thermostats for auto-transformers protection with relay and rest push button. Alternatively, thermistor embedded in the transformers in the transformers windings and a thermistor relay may be provided. d) One (1) approved time delay relay, with at least 0 to 30 seconds adjustable time delay period, to control the start and run contactors. 13.13 ELECTRONIC CONTROL SOFTSTARTER a) The electronic control soft starter shall consists of the following major components : a. Thyristor stack b. Line contactor c. Fuse for thyristor protection d. Electronic control P.C.B b) Electrical Characteristics Voltage : 400 Volt Frequency : 50 Hz Voltage Regulation : 10% Frequency Regulation : 5% Harmonic : Less 15 on motor full speed condition c) Starting Mode The Electronic Control Soft starter shall be of constant current start mode. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 138 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection This constant current start mode shall be incorporated with DIP-Switch which will be able for adjustment of between one (1) to three (3) OR three (3) to five 950 times of the motor full load current. The increase or decrease of adjustment is in steps of 0.5 times. The starting time shall be 5 to 60 sec user adjustable. In additional, the facility for incorporation of optional start mode shall be available. d) The required optional mode are: • Current ramp Mode This module shall be able to modify the current limit characteristic of the constant current mode where the load can vary from start to starts. • Constant Acceleration This module shall be designed to monitor the acceleration of the motor. It shall be connected to the output of a tacho generator attached to the motor and compare the Voltage generated by the tacho generator with a reference ramp voltage. • Timed Voltage Ramp This module shall be able to provide an extended soft stop for the motor and load. For all 100 kW and above, constant current Soft starters must have time current ramp mode option and a correctly rated by-pass contactor. For all motors of 50 kW below, constant current Soft starters just have time voltage ramp mode option. For all motors between 50kW to 100kW, constant current Soft starters must have time current ramp mode option but less the by-pass contactor. All soft starters offered shall be AuCom Auco start closed looped series or equivalent. e) Protection • Phase Loss Protection Sophisticated Vector Analysing Phase Loss Protection must be incorporated for the detection of any imbalance in current vectors (magnitudes and phase angles). This protection shall be able to detect phase losses either before or after the starter. • Overcurrent Protection This shall be of a definite time overcurrent protection system. As such, it very closely reflects the overcurrent capacity of the motor. It must be part of this Electronic Control Soft starter which can differentiate between a starting overload and a motor running overload, thereby offering superior protection. • Excess start Time Protection This feature shall be able to cause the Electronic Control to abort the start procedure if the motor is not up to speed within a pre-set period. The pre-set period shall be 5 to 60 sec adjustable by the user. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 139 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection • Over temperature Protection This feature shall monitors the temperature of this Electronic Control Soft starter and shuts down if an over temperature situation is encountered. • Thyristor Protection This protection shall be of semi-conductor fuses that will enable protection of the thyristor from short circuits and severe overloads. • Phase Sequence Protection This protection module shall be used to protect rotation sensitive machines from damage resulting from reverse rotation. • Thermistor Protection This module shall be capable of monitoring the resistance of PTC thermistors embedded in the motor winding. It shall be designed to detect an over-temperature condition in the motor windings by an increase in the thermistor resistance and to protect the motor from overheating by operating the contractor to remove the power supply to the motor. • Electronic Start/Stop For process plant applications, this facility must be available to allow the motor to be started and stopped without operating the main contactor of the Soft starter. Isolation against induce voltages (arising from longitudinal and transverse spike voltages of neighbouring circuits) causing false starts and stoppages must be present. • For all pump motors, Electronics Soft Stop must be incorporated in the Soft starter so as to remove water hammering and also to extend the life of the main contractor. f) Interface Module i) Off loader Module This module shall provide isolated contacts for A.C. control up to 500 volt. It shall be designed to indicate when the Electronic Control Soft starter is in start mode and this may be sued to inhibit load application to the motor until full speed and voltage has been reached. ii) A.C and D.C Alarm Module This module shall be designed to allow Electronic Control Soft starter to be interfaced with fault indication circuitry. A minimum of four (4) normally open contacts must be available. g) Power Consumption The total power consumption required by this Electronic Control Soft starter shall be less than 20 Watts. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 140 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection h) Proof Voltage The isolation between power circuit, control circuit and ground shall be not less than 2 kV A.C. i) Mechanical Design i) Enclosure The Electronic Control Soft starter shall be house in free standing cabinet constructed from extruded aluminium of minimum 1 mm thickness. The cabinet shall be accessible from the front for servicing, maintenance and inspection with lockable door. The enclosure shall be finished with enamel gross paint. Where IP65 environment applies, the vendor shall ensure the enclosure to be meeting the same if not better standards. ii) Ventilation Sufficient ventilation shall be provided to ensure that all components are operated within their environmental ratings. Built-in air blower shall be used and air inlet and exhaust shall be suitably placed. In the event that forced ventilation is not available. Bypass contractor must be incorporated to minimise the rise in temperature (e.g. installing the Electronics Control Soft starter bore plate inside a main switchboard with many other equipment). j) 13.14 Tropic Proofing The soft starter offered must have a proven experience of not less than 5 different installations under the humidity levels of the locality. VARIABLE FREQUENCY DRIVE / VSD 13.14.1 GENERAL All Drives are to be located as close as possible to the motors being driven. 13.14.2 PERFORMANCE Select each controller on the basis of maximum motor full load ‘nameplate ‘Amps and not motor kW rating. Output voltage and frequency levels should remain constant at any given speed setting when supply voltage varies by not more than ± 20%. The output frequency to remain constant regardless of load variations or supply frequency variation. Output frequency to remain stable throughout the ambient temperature range of 0°C to 50°C. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 141 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Motor audible noise shall be less than that of an equivalent DOL starter. Use skip frequency functions to avoid resonance noise. Controllers suitable for continuous operation at full load in an ambient temperature of 50°C and a maximum storage temperature of 80°C, protected from direct sunlight and over temperatures. Provision for interfacing with BMS shall be provided for monitoring the status of each VFD motor controller. This shall include on/off/trip status and control montioring. 13.14.3 COMPONENTS AND FUNCTIONS Provide IP54 enclosures with forced draft ventilation, self-contained. Filter fans are not acceptable. The controller electronics shall be cooled by sealed heat-exchangers, with no contaminated air entering the electronics area. The controller enclosure shall be porvided with the prime and finish coats, nameplates, voltage warning signs, illustrated operating instructions and parts list mounted insidde the enclosure door, floor mounted isolated handle, manual speed control potentiometer, threeposition mode selector switch – “manual-off-auto”. “power-on” light, speed meter, frequency meter, drive fault light and push button, ammtere, and motor fault light. The controller must have following features: Serial Communications link using MODBUS communication protocol. IP-54 removable display. One optic fibre input and one optic fibre output. Facility to communicate directly with on the project via a standard communications adapter. Full load, 50Hz, efficiency above 97%. Protect each controller with suitably rated high speed semi-condenser fuses or circuit breaker on the input side, selected to provide protection of the controller and associated drive. For controllers above 37 kW, this will be integral to the controller. Variable frequency power and logic unit shall be solid state, continuously rated with microprocessor based drive logic, transforming input power into frequency and voltage controlled output power, for direct connection to a standard squirrel cage induction motor, providing positive speed and torque control, without requiring any de-rating of the motor. Speed Control shall be step less throughout the speed range under variable load conditions. Frequency control shall be achieved using pulse width modulation generating a clean sine wave with an operating power factor of 0.96 or better throughout the entire speed range. Use IGBT devices in the output stage. The controller shall be able to accept at least three selectable switched inputs to override the speed control signal and run at a fixed manually adjusted speed. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 142 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 13.14.4 SAFETY PROTECTION DEVICES Provide the following safety protection features as a minimum requirement, allowing the controller to shut down without component damage: Torque limit to prevent over torque tripping due to momentary overload conditions and allow continued operation (adjustable ±250% of inverter rating). When output current exceeds 110%, halt any speed change until the current drops below 100% when speed change will again be implemented. The controller should not to be damaged by an output current of up to 210% rating. Shut down controller on sustained power loss and upon return of power within a short period of time automatically return the system to normal operation. Controller number of automatic fault resets and restart attempts and the time inferred between these restart attempts to be commissioned in conjunction with the consulting engineer. Shut down the controller and upon return of power automatically return the system to normal operation being capable of restarting a rotating motor immediately and regain positive speed control. (flying start; two second power loss ride through). The following safety devices will not be applicable for essential fire safety services: Short circuit/instantaneous overcurrent trip: On short circuit or instantaneous overcurrent shut down the controller. Earth fault protection: Shut down the controller on phase to earth short circuit protection fault. Under and over voltage trip: Trip when input line voltage drops to 155V AC or when the dc bus voltage exceeds 800V dc. Over temperature trip: Shut down the controller when operating temperatures exceed safe operating limits. Motor overloads (and thermistor protection where applicable): Provided within the controller to protect the motor and controller at all operating speeds. 13.14.5 SPEED CONTROL SIGNALS AND STATUS INDICATIONS Control the frequency output from an input signal derived from DDC or an electronic controller as appropriate. Interface devices to be directly compatible and liaised with the supplier. Upon the input signal dropping more that 50% (adjustable) below the minimum threshold (adjustable) for more than a set time period (adjustable) the controller shall have the facility to be programmed to run at a set constant speed (adjustable) until manually reset at the controller. This facility is of particular importance for critical systems. Provide internal manual adjustment allowing presetting of maximum and minimum speeds with the limits maintained regardless of the input signal. Include an ‘auto-off-manual ‘function and manual speed adjustment shall be possible via the keyboard integral with the controller to allow testing and commissioning of the unit. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 143 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Provide indication at the mechanical switchboard for local auto/off/manual status. Lock out the automatic speed control signal in the manual mode. Provide status indication light emitting diodes and LCD panel with 32 character plain English display for the safety, protection and operating controls specified, located on the controller. In addition, indication for power on, speed and drive enabled shall be provided. Coded messages are not acceptable. Provide voltage free contacts for connection of alarm signals, with contact closure on any fault condition occurring in the unit. Connect all external interlock signals as required to operate the controller to terminals on the controller, with the controller internally wired to suit. Overloads and thermistor protection for each motor shall be provided within the controller. The controller shall accept a PTC thermistor input directly (i.e. without any additional ‘thermistor relay’ or such). 13.14.6 ENGINEERING BACK-UP AND WARRANTIES Complete technical engineering service and spare parts facility: Available locally, with service and reinstatement of the controller to full working conditions following a failure, guaranteed within 24 hours. Installation of the controller: Carried out strictly in accordance with the manufacturer’s recommendations. The controller supplier or a trained representative to attend site to properly set up and adjust the controller at time of commissioning to ensure optimum performance and ongoing trouble free operation and clearly document all internal set points for speed, ramp times, etc. following final adjustment. Provide a written manufacturer’s statement with the tender which states that the electrical system and drive requirements have been fully assessed to assure compliance with the Specification Requirements. Provide a Manufacturer’s Installation Acceptance Statement and 5 year extended Manufacturer’s Installation and Replacement Warranty for all variable speed drives. 13.14.7 RADIO INTERFERENCE The controller must have built-in RFI filters, and comply with AS/NZS 2064. RFI filters, external to the controller, are not acceptable. 13.14.8 HARMONIC DISTORTION Limit percentage Total Harmonic Voltage Distortion (THVD) created by all variable speed drives, to not exceed 1.5% under the worst conditions with either mains or generator supply \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 144 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection when measured in accordance with AS/NZS 61000.1.1 and AS/NZS 61800.3. The controllers must have built-in inductors in the DC bus or the incoming 3 phases. 13.15 13.16 13.17 EARTHING a) All metalwork associated with the electrical installation but not forming part of a phase or neutral circuit shall be bonded together and solidly and effectively earthed. b) Metal conduit, ducts and cable armour shall be earthed a t the switch-board at which they originate by means of locknuts, screwed connection or cable gland. c) Th electrical resistance of metaalic enclosures or framework to earth shall be low enough to permit the passage of current necessary to operate the device protectiong the associated circuit. d) The size of all earth continutiy and bonding conductors shall be in accordance with the local code. SURGE PROTECTION DEVICES a) Surge protection devices shall be provided and comply with IEC 61643-11 for the motor control panel to cover whichever cable route from external or to external of the building. The provision of the surge protection devices shall ensure any lightining syrge from the external installation should not propagate back to the indoor installation. b) All surge protection devices shall be of the pluggable type. A;; bases shall be able to accept cartridges of different discharge current ratings: 15 kA 8/20ms, 40kA 8/20ms and 65 kA 8/20ms. c) Unless otherwise stated, main and swicthboard shall use 65kA 8/20ms cartridges. Distribution board shall use 15kA 18/20 ms cartridge. INSTALLATION PROFESSTIONAL ENGINEER AND LEW SUPERVISION a) The contractor shalll engage sufficient qualified and experienced site staff to execute the works. Registered and licensed tradespersons shall be employed to supervise the works if necessary. b) The services of (LEW) Licensed Electrical Engineer, Professional Engineers (Mechanical and Electrical) and other statutory licensed workers/engineers shall be engaged to assume full responsibilities for all engineering matters, including engineering design, submission to authorities, supervise, installation, switching. These personnel shall be available to attend meetings, discussions, inspections, and the like as requested by the Architect and authorities. Upon completion of the contract works, the contractor’s (LEW) Licensed Electrical Engineer and Professional Engineers shall furnish Completion and Inspection Certificates with the same format as required by the respective authority for the rspective parts of the works to the Architect to certify that all the works are in full compliance with the Specification and Drawings. Certificate of \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 145 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Fitness for Turn-on shall be submitted to certify that all the Electrical works of the contract are in full compliance with the CP5 requirement prior to power trun-on by the Electrical contractor. 13.18 13.19 SITE AND COMMISSIONING a) The plant shall be inspected and tested during and after installation on site as set out below for compliance with the performances, and ratings as specified. b) All tests shall be witnessed by the Engineer/Construction Manager respesentative at site with at least seven days’ notice given prior to any test. c) All tests shall be executed and, if not satisfactory, repeated to th satisfaction of the Engineer/Construction Manager at no extra cost. d) Partial discharge and ultrasound testing fro High Voltage Equipment to locate any high dg readings or any partial disharge. The test shall be performed by Specialist Tester completed with conclusive report to record the working condition of the installation and termination. The test shall perform two times, one at Testing and Commissioning Stage and second one before end of DLP. e) Infrared Thermoelectric Detection to all HV and LV Main Switch Board, Motor Control Centre to locate any hog spot or loose termination. The test shall be performed by Specialist Tester completed with conclusive report to record the working condition of the installation and termination. The test shall perform two times, one at Testing and Commissioning stage and second one before end of DLP. REJECTION OF SWITCHBOARD If any of the baove tests fail to comply with the requirements of this Specification in any respect whatsoever at any stage of manufacture, test, erection or on compeltion at site, whichever is considered necessary, and after adjustment or midifications as directed by the Architect, the contractor shall submit that item for further inspection and/or test. In the event of the defective item being of such nature that the requirements of this Specification cannot be fulfilled by adjustment or modification, such item is to be replaced by the Contractor at his own expense, to the entire satisfaction of the Architect. Delivery of switchboard and distribution board on site without significant cable connetion (say 80%) shallnot entitle progress payment certificate for material deliver on site. 13.19.1 ELECTRICAL EARTHING OF RISING MAINS a) Rising mains shall be electricity earthed. Those joints which do not provide electrical continuity shall be bonded. b) Where the rising main is situated in the vicnity of any lightning conductor, it should also be bonded to the lightning conductor in accordance with the requirements of the local code on lightning protection. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 146 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 14.0 PAINTING AND IDENTIFICATION 14.1 GENERAL Provide painting and identification for all systems in accordance with requirements of AS 2311, AS 2312 and AS 1345. Before commencing with installation Contractor shall provide the following submissions: • • • • Paint systems and colour schedule to be used. Labelling systems. Schedule of statutory, maintenance and operating signage. Material Safety Data Sheets for the products proposed. 14.2 PAINTING 14.2.1 MATERIALS All parts of the work installed under this contract shall be painted as specified below with first quality enamel paints to approval. Paint shall be suitable in all respects for the environmental conditions in which it shall be located. Paint shall be selected to withstand the temperature on the surface to which it is applied. All paint used shall be of one approved manufacture, and shall be a standard colour of that manufacture unless otherwise approved. Before ordering any painting materials, the Contractor shall advise the Project Manager of the type and manufacturer of all materials. Prior to painting, all metallic surfaces except galvanized surfaces shall be thoroughly scraped and wire brushed as necessary to remove scale, rust and swarf. Surfaces shall then be solvent cleaned to remove all oil, grease and dirt. All galvanized metal surfaces shall be properly etch-primed to ensure correct adhesion of the paint to the surface. Materials for etch-priming shall be as recommended by the paint manufacturers. Subsequent painting of galvanized surfaces shall comply with this Specification. When the surfaces to be painted are clean and dry, one coat of an approved primer shall be applied followed by an approved high gloss finishing paint, to be applied when all dust has been removed, and previous coat is completely dry. The following items shall be painted: − All items of plant and machinery − All exposed metalwork \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 147 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection − All pipework All pipework shall be painted to follow AS 2700 and SNI 19-3778: Pipe Colour Label & Arrow Colour Pipe Services Green White Clean water Yellow Black Gas (LPG/N2) Sewage, wastewater, vent & Rain White Black Water Red White Fire Prior to Practical Completion, all surfaces of the newly installed services in plantrooms and where exposed to view including ductwork, pipework and all plant, shall be painted. Concrete inertia bases shall be painted. Concrete plinths are not required to be painted. Paints shall be first grade quality applied as recommended by the manufacturer. Minimum coverage shall consist of one priming coat, one intermediate coat and one high gloss finishing coat. Spray painting shall not be employed. Paint finishes shall be full gloss unless otherwise indicated. 14.2.2 PLANT, MACHINERY AND EQUIPMENT All items of Plant, machinery and equipment supplied painted require no further treatment. All other items of Plant, machinery and equipment shall be given one prime coat, one undercoat and one finishing coat of full gloss enamel. 14.2.3 EXPOSED METALWORK All metalwork exposed to view or to the weather shall be either galvanised or a high quality paint finish with one prime coat, one undercoat and one finishing coat of full gloss enamel. Prime/undercoat all surfaces. Galvanised and non-ferrous surfaces must be etch primed. 14.2.4 CONCEALED METALWORK All galvanised iron and aluminium surfaces concealed in roof spaces, false ceilings, building ducts etc. shall not be painted. All black iron and steel surfaces shall be wire brushed and given two coats of zinc chromate or other approved corrosion resistant primer. 14.2.5 DUCTWORK AND PIPEWORK All ductwork exposed to view within occupied areas and outside the building shall be painted. Ductwork in Plant rooms does not require painting. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 148 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection All pipework exposed to view within occupied areas including the car park and Plant rooms and exposed to view outside the building shall be painted. 14.3 IDENTIFICATION AND LABELLING 14.3.1 EQUIPMENT IDENTIFICATION All items of equipment shall be identified in accordance with AS1318 and to approval by means of sign written lettering 50mm to 100mm high in a contrasting colour to that of its background colour. Instrument tappings will be labelled to indicate function. 14.3.2 PIPEWORK IDENTIFICATION All pipes, etc. shall be identified in accordance with AS1345. Circumferential bands of Standard ground colours shall not be less than 100mm wide on pipes up to 60mm nominal diameter and not less than 150mm wide on pipes greater than 50mm nominal diameter. Supplementary colours shall be displayed as bands not less than 25mm side in the centre of the ground colour bands. Where lettering is required it shall be painted in contrasting colours in accordance with the Code, in block letters not less than 15mm high for pipes up to 50mm nominal diameter, and in block letters not less than 40mm high for larger pipes. Direction of flow shall be indicated by an arrow painted on the pipe adjacent to each colour band. Arrows shall be 75mm long on pipes up to 50mm nominal diameter and 250mm long on larger pipes. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 149 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 15.0 NOISE AND VIBRATION 15.1 VIBRATION CONTROL 15.1.1 GENERAL a) The contractor shall furnish and install all vibration and noise control devices, materials and related items. The contractor is expected to perform work as shown on the drawings and described in the specifications for the project to meet the requirements of the specified noise and vibration control criteria. b) The contractor shall co-ordinate with other trades to avoid through their related activities any rigid contact with the building that will degrade the noise and vibration with ‘following-work’, such as plastering or electrical, to avoid any contact which would adversely affect the vibration isolation. c) The contractor shall bring to the Architect’s attention prior to installation any conflicts with other trades’work which will reslut in unavoidable transmission contact with equipment due to inadequate provision of space or other unforeseen conditions. d) Prior to installation, the contractor shall bring to the Architect’s attention any discrepancies between the Specifications and the actual site conditions or changes required due to specific equipment selection. Corrective work necessitated by discrepancies discovered after installation shall be at the contractor’s expense. e) The contractor shall be responsible for providing vibration isolators of the appropriate size and capacity to meet the specified deflection and noise control requirements and shall follow the instructions from the manufacturer or vendor of these products. f) The contractor shall submit to the Architect for review product data, including manufacturer’s specifications and installation instructions. g) The contractor shall submit samples of vibration isolators (each type) to the Architect for review. h) The contractor shall submit the vibration isolators type, manufacturer, location, equipment to be isolated and specifications for review. Specifications shall include isolator free standing heights, static deflection at chosen load, spring diameter and material. i) The contractor shall submit calculations indicating that the deflection of proposed framework for any frame mounted equipment does not exceed one-tenth of the deflection of the vibration isolator. j) Vibrations isolators shall be produced by a reputable, established manufacturer. A single, approved manufacturer shall supply all vibration isoaltors. Within a stated, reasonable time period after being awarded the contractor shall submit to the Architect a \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 150 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection complete list of all products proposed for use, including the manufacturer’s name and all realted product data. k) The resonant frequency of the isolation system shall be lower than any operating speed and in no circumstances shall coincide with the natural frequency of any component of the equipment. l) Vibration systems shall be selected to suit the environment in which the equipment is to be located. For example, weatherproof, non-rusting, etc. m) All vibration isolators shall have either known undeflected heights or calibration markings so that, after adjustment, when carrying their load, the deflection load can be verified. 15.1.2 n) All isolators shall operate in the linear portion of their load versus deflection curve. Load versus deflection curves shall be furnished by the manufacturer, and must be linear over a deflection range of not less than 50% above the design deflections. o) Overloading of any isolator during installation or servicing shall require isolators to be fitted with overloading restarints. p) Overloading of equipment due to service connections shall not occur. SPRING ISOLATORS a) Spring type vibration isolators shall preferably be constructed from suitably treated and finished steel or steel alloys. They shall be equipped with 2 layers of neoprene ‘acoustic pads’ to prevent transmission of high frequencies. b) Spring type vibration isolators shall be free-standing and laterally stable, without any housing. All mounts shall have levelling bolts. The spring diameter shall not be less than eight-tenths of the compressed height og the spring at rated load and springs shall be capable of ‘additional travel to solid’ for another 50 percent, as a minimum before becoming fully compressed. c) Springs shall be selected so that the ratio of horizontal stiffness to vertical stiffness ranges between 0.9 and 1.1. d) Restrained spring isolators shall have vertical travel limit stops to control extension of the spring when the weight is removed or to provide wind resistance in utdorr locations and to prevent excessive movement as the machine speed passes through the resonant frequency of the mounting system. e) Where restrained spring isolators are to be used, minimum clearance of 13 mm shall be maintained around restraining bolts and between the housing and the spring so as not to interfere with the spring action. Limit stop shall be out of contact during normal operations. Mountings used out of doors shall be painted, hot dipped galvanised or neoprene coated. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 151 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 15.1.3 15.1.4 15.1.5 f) Spring isolators shall be selected to support the required loads with the specified minimum deflection but not being compressed solid or exceeding the maximum rated capacity of the spring. g) Weight distribution of equipment, pipes, dynamic load due to fluid flow shall be considered int he spring selection. NEOPRENE ‘IN-SHEAR’ ISOLATORS a) The active element of the isolator shall be bonded to mild steel or steel alloy plates, sleeves, pressings or forgings. Both element and bonding agent shall be resistant to lubricating oil and water suited to the operating temperature. b) The location of the fxing bolts shall not be in such a way that creates unnecessary stress in the elements. c) The dynamic deflection and damping coefficients of the active material, at the operating speed of the supported equipment, shall be used in calculation of isolatoion efficiencies. Alternatively, certified isolation efficiency charts may be used. d) Mountings whose stiffness varies with direction of deflection shall be mounted with orientation marks for use during maintenance and installation. VIBRATION ISOLATION PADS a) Waffle-pattern or ribbed neoprene pads shall be made of 40 to 50 durometer neoprene. Where required these shall be adhesively cemented to 1.6 mm steel plates of similar area so as to form a sandwich. b) Pads may be bolted through (where necessary) with bolts isolated from the machine by neoprenee grommets. Alternatively ‘waffled’ neoprene pads can be used without holding downbolts where the vibration is minimal and the weight of machine is such that the resultant friction is adequate and the machine unlikely ever to move. c) The are of pad to be used and number of layers shall be determined for each application in accordance with the manufcturer’s recommendation. Where multiplelayer pads are selected to increase the static deflection the layers are to be separately by steel shims as recommended by manufacturers. DOUBLE DEFLECTION PADS a) Double deflection pads shall be of 40 to 50 durometer neoprene and sized so that deflections do not exceed 15 percent of the pad’s thickness. b) All metal surfaces shall be neoprene covered to avoid corrosion and have friction pads both top and bottom. c) Bolting down holes shall be provided for applications where bolting down is required. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 152 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 15.1.6 PIPE HANGERS AND SUPPORTS a) Piping connected to vibration-isolated equipment shall be installed so that it does not strain or force vibration isolators supporting the basic equipment out of alligment. Pipes shall not restrict such equipment from floating freely on its vibration-isolation system. b) Springs in series with neoprene pad hangers shall contain a steel spring that is set in a neoprene cup manufactured with a projecting brushing that passes through the hole in the hanger box or is otherwise isolated from the hanger housing to prevent shortcirculating of the hanger rod against the hanger box. c) The neoprene cup should have a steel washer designed to distribute the load properly on the neoprene and prevent its extrusion. d) Spring should have a minimum additional travel to solid equal to 50 percent of the rated deflection and diameters equal to no less than eight-tenths of the compressed height of the spring. Minimum deflcetions shall be 25 mm. e) All pipe supports shall incorporate a neoprenen or felt gasket. 15.1.7 PIPEWORK GENERAL a) All supports or hangers horizontally or vertically installed shall incorporate felt or neoprenen gaskets of minimum thickness 6mm. b) When a pipe passes through the plant room wall, a minimum 25mm clearance shall be provided between the pipe and the penetration in the wall. The pipe shall be supported on either side of the hole, so that the pipe does not rest on the wall. The clearance space shall be stuffed with fibraous fill or material and sealed both sides with nonsetting or non-hardening fire stop material. c) All piping within plant rooms or other specified areas shall be resiliently supported from the building structure with spring in series with neoprene hanger. d) Pipework connections to pumps shall include minimum 300mm straight flanged sections for insertion of flexible connections at a future date if necessary. 15.1.8 FLEXIBLE CONNECTIORS/EXPANSION JOINTS a) Flexible noeprene connection shall be used on all equipment as indicated on the Drawings or the equipment schedule. They shall be manufactured of multiple ply of nylon type cord fabric and neoprene both bonded and cured in hydraulic rubber pressses. Where flexible pipe connections are required, they shall have a length that is approximately 6 to 10 times the diameter. Twin sphere connectors shall be used. b) The axis of the connectors shall be perpendicular to the direction of vibration. Alternatively, where the design allows, the connectors may be formed into 900 bends. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 153 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 15.1.9 c) Where expansion joints are required to achieve vibration isolation, the tie rod system fixings shall be contrucsted in such a wy to prevent metal to metal contact throughout the normal range of mivement of the joint. d) Where service pipes are joined to equipment incorporating flexible connections the first 3 service supports after the flexible connection shall have vibration isolation mounting with minimum 25mm static deflection or one-half the static deflection of the mounting system used for the equipment whichever is greater. INERTIA BASES a) Concrete inertia blocks shall be formed of stone-aggreagate concrete (2400 kg/m3) cast within a reinforced steel frame made by bolting or welding formed or structural channels or beams. Inertia block shall be reinforced with 12mm diameter steel bars at 150mm centres. b) Inertia blocks shall have a minimum depth equal to one tenth of the longest dimension of the base but not less than 150mm deep. Minimum 50mm clearance between bottom of inertia block and supporting slab shall be allowed. c) The weight of the inertia base is to be determined by the inertia base/equipment mass rtio as recommended below: Fans : Min. 2 x unit weight Pumps electric: Min. 2 x unit weight d). Electrical connections to the equipment motors shall be made with long floppy length of flexible cables and piping resiliently supported. 15.1.10 EQUIPMENTS MOUNTING a) The contractor shall submit cataloques of proposed equipment complete with manufacturer’s specification to the Engineer for review. b) Mechanical equipment with operating weights substantially different fro installed weigths (such as pump) and equipment subject to wind loads (such as roof top equipment e.g. cooling towers, chillers) shall be mounted on spring isolators with travel limit stops. c) The installed and operating heights of the vibration-isolation equipment shall be idential. Maintain a minimum clearance of 100mm around restraining bolts and between the housing and the spring to prevent interference with the spring action. Keep travel limiting stops out of contact with isolator top plate and bolts during normal operation. d) Unless otherwise specified, all floor-mounted equipment shall be set on minimum 150 mm high concrete plinth. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 154 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection i) All fans and motors shall be isolated with spring isolators complete with doublelayer neoprene pads separated with 1.6mm steel shims. i) Each AHU shall rest on spring isolators of minimum 25mm static deflection with two layers of 8mm thick neoprene waffle pads. There shall be no significant casing radiation due to such installation. All pipes connected to AHU’s hall have flexible pipe connectors. ii) All chillers shall be mounted on rigid steel frames and isolated with restraint spring isolators of 50mm static deflcetion with double layer neoprenen friction pads. iii) All pipework between chillers and associated equipment shall be resiliently supported. All water pipes shall be isolated with 13mm thick felt or resilient pads under the pipe strap or clamp. Piping to chiller connected to fan coil units shall be isolated with rubber isolation sleeves. iv) Fan coil units shall be suspended with two layers of mm thick neoprene hanger. All pipes connected to fan coil units shall be isolated with rubber isolation sleeves. v) Pumps shall be mounted upon raised concrete plinth (150 mm) and incorporating an inertia block 2 times the total weight of pump and motor. System resonant frequency shall be lower than the pump blade passage frequency or motor rpm whichever is lower. In-housed type spring in series with 2 layers of 8mm thick neoprene pads shall be used to support the pump and inertia block. vi) Cooling towers shall be supported by restrained type spring in series with 2 layers of neoprene isolator with minimum 65mm static deflection. All springs and supports shall be hot dipped galvanised. 15.1.11 OTHER ASSOCIATED EQUIPMENT AND NON-VIBRATION EQUIPMENT a) All other mechanically and electrically associated equipment that is capable of causing undue cibration and noise shall be vibration isolated with 25mm static deflection spring and neoprene 2 layers of isolators. b) To short-circuit noise and vibration transmitting paths, all non-vibrating equipment shall be isolated with neoprene friction pad. c) It is the responsibility of the contractor to include the cost of such work in his tender price. 15.1.12 EXECUTION a) Locations of all vibration-isolation devices shall be selected for ease of inspection and adjustment as well as for proper operation. Vibration-isolation hangers shall be placed so that hanger housings may rotate a full 3600 without touching any object. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 155 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection b) Under no conditions shall piping, ductwork, or conduit be suspended from one another or touch one another. Vibrating systmes should be kept separate from non-vibrating systems. c) Vibration isolators shall be fixed without unnecessary stressing of the elements. d) Vibration isolator types are indicated below. Selection shall vary and follow the criticality of adjacent spaces, and the running speed of the equipment. A guide to selection is contained in Table I. e) The contractor shall submit the schedule of mechanical vibration isolation systems and noise control products selected and to be used in this project. f). Locations of all vibration-isolation devices shall be selected for ease of inspection and adjustment as well as for proper operation. Vibration-isolation hangers shall be placed so that hanger housings may rotate a full 3600 without touching any object. 15.2 ACOUSTIC REQUIREMENTS 15.2.1 GENERAL a) This section covers general requirements of materials, contruction and applications required to achive a confortable acoustic environment within the building and the criteria as set out below. b) The total noise level arising from all simultaneously operating mechanical and electrical plant as well as regenerated aerodynamic noise, whether it be ductborne, structurally transmitted, or airborne, shall be limited to the following levels, unless indicated otherwise in specific parts of the Specification. c) The noise rating (NR) levels for spaces shall be as indicated in Table 1. d) The noise level shall be measured at 1.5m above the floor level, except next to the plant room where the measuring points shall be 1.5mfromthe room walls. e) The contractor shall be responsible for providing acoustic products of the appropriate size and capacity to meeet the dynamic insertion loss and self noise requirements and is required to follow the instructions from the manufacturers or vendors of these products. f) The contractor shall submit to the Engineer for review product data, including manufacturer’s specification and installation instructions. g) The contractor shall submit certified test data on dynamic insertion loss, self noise power levels and aerodynamic performance for reverse and forward flow test conditions as in accordance with ASTM E77-80 or equivalent. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 156 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 15.2.2 h) Acoustic products shall be produced by a reputable, established manufacturer. A single, approved manufacturer shall supply all sound attenuators. Within a stated, reasonable time period after being awarded a contract and before ordering any materials, the contractor shall submit to the Engineer a complete list of all products proposed for use, including the manufacturer’s name an all related product data. i) The contractor shall report to the Engineer in advance and in writing any limitting effect of the intended attenuator loactions and system conditions on performance. j) All self-noise and dynamic insertion loss data shall be in accordance with the applicable portions of ASTM E477-80 to the latest revision. k) It is the responsibility of the contractor to bring to the Engineer’s attention if in his opinion there are constraints in the design that will forbid his attainment of the required criteria. NOISE AND VIBRATION COMPLIANCE TEST a) Compliance tests shall be carried out to ensure the installation will fulfill the stipulated requirements and criteria. b) Tests shall be carried out when the mechanical equipment is at normal operating condition. At time of the tests, the areas to be tested shall be unoccupied and not suffering from any other noise intrusion. c) All equipment used for the tests shall be calibrated. The sound level meter and octave filter set used shall meet the ISO/IEC 651 Precision and general purpose sound level meters requirements. d) All dBA and octave band sound pressure levels shall be read direct from the sound level meter or plotted on a chart level recorder. Real time analyser may be used to check the effectiveness of vibration isolators installed if there is reason to suspect inadequate vibration isolation as determined by the Engineer. e) The contractor shall be responsible for all corretcive work should the vibration and noise levels due to the installation exceed the Specification. The contractor shall also be responsible for the cost of all tests after his remedial work. f) Vibration measurements shall be made using calibrated accelerometer, charge amplifiers and narrow band analyser. Hard copy printout is necessary for documentation. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 157 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection TABLE 1 – NOISE AND VIBRATION CONTROL 1. VIBRATION CONTROL All anti-vibration mountings and hangers shall be selected for the particular duty and in accorddance with manufacturers recommendations. Minimum static deflection shall not less than the following: Equipment Type of Mounting or hanger Minimum Static Deflection Mm 40 Air compressor Inertia base required if larger than 7.5 kW Pumps Inertia base and Spring mountings with Neoprene pads 50 Reciprocating Chiller Set Free standing springs and neoprene pads 40 Centrifugal Chillers Free standing springs and neoprene pads 40 Pipework Spring hangers with Neoprene pads First three hangers From equipment to Have static deflection Equal to machine Mounting 25 Cooling Towers Restrained Springs and Neoprene pads Spring static deflection: • 0 – 300 rpm • 300 – 500 rpm • > 500 rpm 90 65 20 Spring hanger with neoprene inserts Spring static deflection • Roof or floor mounted • Wall mounted 40 10 Axial Flow Fans Centrifugal Free standing spring \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 158 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Fans mountings with Neoprene pads Spring static deflection: • < 610 mm dia • > 610 mm dia - 0 – 300 rpm - 300 – 500 rpm - >500 rpm Fan > 610 mm with shaft power more than 37 kW shall include inertia base 20 90 40 20 Heat Exchanger neoprene pads --- AHU/PAU Free standing Spring and Neoprene pads 25 FCU Double layers Neoprene pads --- 2. ACOUSTIC REQUIREMENTS Noise Rating (NR) Type of Occupancy/Activity Sound Level Criteria (NR Level or dBA as noted)) Car/motorbike parking 60 dBA AHU plant rooms Emergency diesel plant room 60 dBA 110 Retail spaces 45 Cafeteria/café/food court 45 Toilets 50 General lobbies and corridors 45 Conference room 35 Tall lobby spaces (atrium) 40 Pre function space 40 \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 159 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Museum 40 General offices 38 Executive lounge 40 Executive lobbies 40 Executive offices 35 - 38 Staircases (emergency use) 60 Staircases (normal) 45 \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 160 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 16.0 SEISMIC SUPPORT SYSTEMS FOR MEP SERVICES The Contractor and Vendor must take the design fully responsibility for the seismic restraints (sway bracing) and connections details associated with all fire protection installation: sprinkler, hydrant, Sprinkler (Pre-Action) and Novec. As a part of the final shop drawing process the contractor shall engage a qualified specialist engineer to design and stamp/signed restraints for equipment braced off/attached to structural elements (foundations, column, beams, roof, etc.) including the interfaces to adjoining components MEP accessories and other non-structural items. The Contractor and Vendors/manufacturers are responsible to ensure that their product is designed comply to FM Global with the following parameters. Equipment, piping, etc, must be sufficiently strong to withstand such external forces such as earthquakes. The strength of installations, parts and material must be measured and calculated necessary. Parts shall be UL/FM. Contractor (Vendor) must carry out training, site supervision during installation and meeting if required. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 161 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 17.0 TESTING, COMMISSIONING AND HANDOVER 17.1 GENERAL The entire works included in this contract shall be fully tested in stages as the work proceeds and on completion of work as applicable. The Contractors shall provide during normal working hours, all necessary labour, instruments, equipment, materials, fuel, power and maker's representatives, to carry out such tests as may be necessary to satisfy the Engineer that the installation meets the requirement and intent of the specification as well as such tests required by Local Authorities. All tests shall be made in the presence of the Engineer or his representative or any inspecting authority. At least five working days’ notice in writing shall be given to the inspecting parties before performing any test. Three copies of all test results shall be submitted to the Engineer in A4 size paper within two weeks after completion of the tests. Tests described hereinafter and including all tests prescribed by the Authority having jurisdiction shall be carried out. Any tests proved unsatisfactory shall be repeated to the satisfaction of the inspecting parties. The Contractor shall provide skilled technicians/engineer to commission the Plant and associated controls to the satisfaction of the Engineer. The technicians/ engineers will be required to demonstrate the correct procedures in starting and stopping the Plant, running the various items of equipment under automatic and manual control and the correct maintenance of the Plant. Water flow rates of all equipment shall be adjusted to design conditions. Complete results of adjustments shall be recorded and submitted. 17.2 TESTING The following items of equipment shall be tested at the manufacturer's works or elsewhere as appropriate. `Type-Test' certificate may be provided as stipulated in the following clauses. In all cases, factory test certificates or type test certificates shall be submitted in triplicate to the Engineer. 17.2.1 VALVES, COCKS AND FITTINGS `Type-Test' and approval certificate for pressure test and compliance with the regulations laid down by the local Water Authority. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 162 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 17.2.2 PIPEWORK LOAD TEST The Engineer shall select at his discretion any section of fire services pipework for the following load tests as recommended in the NFPA. Hangars shall be capable of withstanding the test loadings given in NFPA Rules. When installed and subjected to the test loadings, the hangar shall not rupture, pull out, distort or otherwise be damaged and hangars shall not show permanent distortion resulting in a change in level or material position of the pipe to be supported in excess of 8 mm. If insitu tests are conducted, appropriate safety precautions must be taken. 17.3 ON-SITE TESTING AND COMMISSIONING Two months prior to completion of the contract works, the contractor shall liaise with the main contractor and the services contractors and submit for the Engineers approval a detailed programme for conducting on-site acceptance tests and commissioning. The contractor shall start up, operate, test and adjust the system in accordance with the agreed programme. The setting shall be supervised by the manufacturer’s representative, who shall remain on site until the equipment is operating satisfactorily and accepted by the Engineer. The contractor shall advise and co-ordinate with the manufacturer’s representatives so that all testing is carried out according to the agreed programme. The whole installation shall be given the following tests to bring the systems into running order. The Engineer shall be given reasonable notice together with a copy of recorded test results, generally not less than seven (7) days, regarding the nature of tests, the time and location. Acceptance tests will only be witnessed by the Engineer when the submitted tests results are found satisfactory. All instruments, tools, material and labour required to perform these tests shall be provided by this Contractor. Before the tests are carried out, the Contractor shall remove connected equipment and components which are liable to damage under test, and shall provide and fix all the necessary gauges, blanking flanges, etc. Prior to the system start-up, the following inspection, tests and pre-commissioning treatment shall be carried out by the Contractor: a. Water Heaters During the flushing, cleaning and water treatment of the pipework systems the hot water shall not be connected. This is to prevent contaminated water and solid particulates passing into the heater vessels. Follow manufacturer’s instructions and ensure all associated devices with the hot water vessels are installed and working correctly. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 163 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Allow only clean treated water into the vessels. Check all associated electrical and control connections and devices before filling. Allow water to enter the vessel only when all checks have been carried out and found to be in the correct working order. Once water has been introduced warm the vessel steadily to the upper limits and then check high level outs and low level cut outs. Finally set thermostat to required level (65ºC) b. Pressure Switches (fire services) The testing equipment arrangement for pressure switches and pressure gauges shall be as shown on the drawings or of an approved equivalent. The testing equipment shall be designed for nominal working pressure of 25 bar (PN 25) conforming to the BS, e.g. the pipework shall conform to BS 1387:1967 Table 3 for class heavy galvanized mild steel tube. The pressure settings corresponding for pump cut-in (lamp and buzzer energized) and pump cut-out (lamp and buzzer de-energized) and reset differentials shall be tested by applying the hand jacking pump or by opening the test valve. The pressure gauges to be tested shall be connected as shown on the drawing in lieu of the pressure switch. The gauges to be tested shall be regarded acceptable when the pressure readings of all three gauges are the same throughout the jacking pressure range varied by applying the hand pump. c. Flow switches (fire services) The testing equipment for the flow switches shall be a as shown on the drawings or of an equivalent approved by the Engineer. The calibration test equipment shall provide a flow of 60 dm3/min over the vane of the flow switch in the direction shown, to be confirmed by the direct reading flow meter. The flow switch contacts energize the lamp and the buzzer, if a flow is not greater than 60 dm3/min flowing over the vanes in the correct direction. (d) Hydrostatic Tests (all services) All parts of the water circuit shall be filled with water before hydrostatic pressure testing, and pump running tests for verification of pressure and flow rate, are conducted. The hand operated pump shall be applied to increase the system pressure to 2 times the working pressure or 1.5 times the working pressure plus 3.5 bar whichever is the lower but in any case not less than 7 bar. The pressure shall be maintained for a period not less than 24 hours. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 164 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Where any section of pipework or equipment is unable to withstand the maximum pipework test pressure, it shall be isolated during the pipework test then that section of pipework or equipment shall be re-tested at the appropriate test pressure. (e) Cleaning, Flushing (all services) Prior to start-up and satisfactorily hydraulic testing, the Contractor shall clean the entire installation including all fitments and pipework and the like after installation and keep them in a new condition. All pumping systems shall be flushed and drained at least once through to get rid of contaminating materials. All pipes shall be rodded when necessary to ensure clearance of debris. Cleaning and flushing shall be carried out in sections as the installation becomes completed. All strainers shall be inspected and cleaned out or replaced. (f) Hydrant Systems The systems shall be tested to confirm that the pressure and flow rate, and the throw of water from a standard branch pipe and 30 m hose line fitted to each hydrant point and each hose nozzle shall conform to this specification prior to the actual Local Fire Department's inspection. All hose isolating valves and all hose nozzle on/off valves shall be lubricated. Starting of pumps shall be by loosening the glass cover rather than by breaking glass. The (hydraulically) remotest fire hydrant outlets shall be connected with 30 mm to 70 mm non-perforating FS hose and an appropriate branch pipe and suitable pressure and flow measuring devices according to NFPA Rules requirements for flow and pressure verification test. The same measurement shall be carried out for the (hydraulically) nearest hydrant outlets. The hydraulically remotest hose reel nozzles shall be tested for a throw of jet not less than 6 m when the hose is arranged to be squeezed by the self-closing doors it has to pass through, i.e. when the doors are not kept open intentionally. The same throw requirement shall be satisfied for the (hydraulically) nearest hose nozzle. Pump cut-in and cut-out, pump lead-lag test, test for water level high level, low level alarms and the like shall be integrated into the system running test as far as possible. All interior piping and attached appurtenances subjected to system working pressure shall be hydrostatically tested at 200 psi (13.8 bars) and shall maintain that pressure without loss for 2 hours. Loss shall be determined by a drop in gauge pressure or visual leakage. The test pressure shall be read from a gauge located at the low elevation point of the system or portion being tested. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 165 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 17.4 PLUMBING, SANITARY, FIRE SUPPRESSION SYSTEM AND FIRE SYSTEM SITE TESTING 1). Execution of testing a. The plant shall be inspected and tested during and after installation on site as set out below for compliance with the performance, and ratings as specified. b. All tests shall be witnessed by the Architect’s representative at site with at least seven days notice given prior to any test. c. All tests shall be executed and, if not satisfactory, repeated to the satisfaction of the Architect at no extra cost. 2). Preliminary Commissioning Check a) a). The contractor shall ensure that all equipment included under this contractor is thoroughly cleaned, lubricated and checked for serviceability immediately before setting to work. Particular attention is drawn to the removal of building debris from motors and pipework. b) b). All pipework shall be thoroughly flushed and chemically cleaned to ensure all foreign matter is removed and internal surfaces are degreased. During all preliminary flushing, plant shall be isolated by means of bypasses to avoid dead legs, and the systems shall be completely isolated from any existing systems to ensure contamination cannot occur. c) c). Further flushing and chemical treatment shall be carried out on isolated systems by connection of temporary diesel driven pumps to circulate water and dosing chemicals d) d). All automatic controls and safety devices shall be inspected and checked for serviceability before the working fluid or electricity is applied to the system. 3). Pipe and Water Systems a) a). All the commissioning procedures shall comply with those set out in the current edition of SNI 03-6431-2000, SNI 03-3989-2000, SNI 03-1745-2000, SNI 8153 – 2015. b) b). All water pipework and other fittings shall be hydraulically tested to 1.5 times the maximum anticipated working pressure but in no case less than 14 bar. c) c). Where any section of pipework or equipment of the plant is unable to withstand the maximum pipework test pressure, it hall be isolated during the pipework tests, then, that section of pipework or equipment shall be re-tested at the appropriate test pressure. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 166 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection d) d). Before finally charging, the water systems shall be thoroughly flushed and all strainers, filters, etc. cleaned. e) e). i. ii. iii. iv. v. The following data shall be recorded on the commissioning sheets: Circulation pump motor speed. Suction and discharge heads for all the pumps, and flow rates as checked against pump curves. Starting and operating current of each pump motor. Water pressure drop across each item of hydraulic equipment, e.g. sand filters, carbon filters, strainers, etc. Noise and vibration level of pumps. 4). Control System a) a). The contractor shall include all automatic controls to be commissioned and tested by the control manufacturers Engineer. b) b). The contractor shall calibrate all pressure stats. c) c). Interlocking circuit and safety devices shall be tested to ensure safety operation of the plant. d) d). Other site as specified in the Control Section of this General Specification shall also be performed. 5). Electrical Test After erection of the switchboard on site, the following tests shall be performed in the presence of the Architect a) b) c) d) e) f) g) Inspection of switchboard including wiring, electrical and mechanical connection. Mechanical test Continuity and dielectric test Power frequency pressure test Functional checks Earth electrode resistance test Primary and secondary injection tests commissions and calibrate measuring, protection and control circuits and associated components. On completion of the above tests, the contractor shall commission the switchboard on noload and perform the following tests: Voltage test for phase and phase to neutral Phase sequence tests on every outgoing circuits. The following tests shall be carried out in full compliance with the PUIL Regulations by the contractor in the presence of the Engineer: a) Insulation resistance test of all power and control cables. b) Insulation resistance test of all motor windings \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 167 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection c) d) e) f) g) Test of conductor continuity Test of effectiveness of earthing. All thermal overload relays and starters Sequence of operation Flick test of motors. All other site tests as specified in the Electrical Section of this General Specification or as required by relevant local authorities shall also be carried out. 6). Water Tanks All open water tanks shall be tested on site for twenty-four hours to verify no leakage. Closed tank shall be tested at 1.5 times of the maximum anticipated system water pressure. 17.5 FINAL ADJUSTMENT AND COMMISSIONING 3. When the entire installation works are completed and all the above checking and testing have been properly carried out, the contractor shall set to work, regulate and calibrate the entire installation. Particular attention shall be paid to the following : a) a). All valves, switches, controls, etc., are regulated to operate properly in accordance with the specified performance. All valves shall be able to be shut off totally at the maximum anticipated system working pressure. b) b). All equipment meets the specified noise and vibration levels. c) c). All instruments are correctly calibrated and read accurately. d) d). All control systems are functioning by the respective Manufacturer’s qualified field testing and commissioning engineers. 4. The contractor shall be aware that the commissioning may need to be carried out after the Completion Certificate is issued and after normally office hours, as required by the Employer. 17.6 HAND OVER 1. The following procedure shall be adopted prior to handing over the installation : a) a). All preliminary testing, checking, adjusting, and balancing of the installation shall be carried out before forwarding notification that the installation is considered to have reached Practical Completion. b) b). After inspection, and when the Architect is satisfied and agrees that the installation is ready for handing over to the Employer, the plant shall be finally commissioned and Installation Manuals together with as-built drawings shall be provided as specified. c) c). Completion Certificate will be issued only after the plant has been inspected and approved and the above requirements fulfilled. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 168 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 17.7 FACTORY TEST The following items of equipment shall be tested at the manufacturer’s works or elsewhere as appropriate prior to installation. In all cases, test certificates shall be submitted in triplicate. 17.8 PUMPS Type-test Certificates for head discharge, speed and power input. 17.9 ELECTRIC MOTORS ‘Type-test’ Certificates. For motors of 40 kW output and above, routine individual test certificates shall also be submitted. 17.10 STARTERS AND CONTROL GEAR Type-test Certificates. For control panels as a whole, routine (individual) high voltage test. 17.11 FACTORY HYDROSTATIC OR PRESSURE TESTS a). Each of the following equipment shall be individually tested to at least1.5 times of the maximum anticipated system working pressure. 1. Pumps b). Switchboard and Electrical Equipment All ‘Type-test’ certificates as specified in the Electrical Section of this general Specification shall be submitted. 17.12 STATUTORY AUTHORITIES TEST AND INSPECTION As and when notified in writing or instructed by the Engineer, the Contractor shall submit shop drawings and attend all tests and inspections carried out by Local Fire Authority, Water Authority and other Statutory Authorities, and shall forthwith execute free of charge any rectification work ordered by the Engineer as a result of such tests and inspections which determine non-compliance with Statutory Regulation. Some of these tests may take place after the issue of Practical Completion of the Main Contract and the Contractor shall make all allowances in this respect. The submission shall comply with the requirements set forth in the current Codes of Practice and circular letters of the Statutory Authorities. The shop drawings to be submitted shall be forwarded to the Engineer for checking before submission. The Contractor shall ensure that his submission shall not delay the subsequent Local Fire Department's inspection and test, otherwise he shall be fully responsible for any consequence due to his delay. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 169 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection The Contractor shall allow for at least two Fire Authority Submissions of complete sets of shop drawings, one to be made within three months after the award of the Contract and shall not be less than six weeks before the inspection. The Engineer may at his discretion instruct the Contractor for additional submissions to Fire Department whenever necessary. The Contractor shall notify the engineer at least seven days in advance of his application for local Fire Authority tests and inspections. On receipt of a confirmed date for test and inspection the Contractor shall inform the Engineer without delay. 17.13 PRELIMINARY COMMISSIONING CHECKS Ensure that all equipment is thoroughly cleaned, lubricated and checked for serviceability before setting to work. Particular attention is drawn to the removal of building debris from the pipework systems. Special attention is drawn to the need for thoroughly flushing out all pipework systems to ensure that all foreign matter is removed. All automatic controls and safety devices shall be inspected and checked for serviceability before the working fluid or electricity is applied to the system. 17.14 COMMISSIONING When the various installations have been completed and the preliminary commissioning checks carried out, the Contractor shall set to work, regulate and calibrate all system in the entire installation. Special attention shall be paid to the following items: That all valves, switches, controls, etc. are regulated and capable of proper operation and in the case of isolation valves that they are capable of tight shut off. That all apparatus is silent in accordance with the requirements of this Specification. That all instruments are correctly calibrated and read accurately. That all services are tested in accordance with the details in the relevant clauses of this Specification. Operate pumps, pressure reducing sets, etc. to ensure that all control systems are functioning correctly and are properly set, sequenced or interlocked. 17.15 FINAL ACCEPTANCE TESTS Following commissioning of the entire installation, and prior to issue of the Completion Certificate. The Contractor shall carry out final acceptance tests in accordance with a programme to be agreed with the Engineer. Should the results of the acceptance tests show that plant, systems and/or equipment fail to perform to the efficiencies or other performance figures as given in this Specification, the \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 170 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection Contractor shall adjust, modify and if necessary replace the equipment without further payment in order that the required performance is obtained. Where acceptance tests are required by the relevant Authorities having jurisdiction, these tests shall be carried out by the Contractor prior to the issue of Completion Certificate to the acceptance of the Authorities. 17.16 REJECTION OF PLANT Any item of plant or system or component which fails to comply with the requirements of this Specification in any respect whatsoever at any stage of manufacture, test, erection or on completion at site may be rejected by the Engineer either in whole or in part as he considers necessary/appropriate. Adjustment and/or modification work as required by the Engineer so as to comply the Authority's requirement and the intent of the specification shall be carried out by the Contractor at his own expense and to the satisfaction of the Authority/Engineer. After works have been accepted, the Contractor may be required to carry out or assist in carrying out additional performance tests as reasonably required by the Engineer. 17.17 WARRANTY AND HANDOVER The Contractor shall warrant that all plant, materials and equipment supplied and all workmanship performed by him to be free from defects of whatsoever nature before handover. The Contractor/Contractor shall obtain all guarantees specified in the Specifications on formats approved by the Owner Representative covering the workmanship and materials for the period stipulated. The original guarantee shall be forwarded to the Owner Representative within the time state in the Contract document. 17.18 SPARE PARTS a). Contractor shall keep sufficient spare parts during the Defects Liability Period to ensure that replacement work for defects can be carried out immediately. b). All spare parts and consumable materials for the proper maintenance of the entire sub contract works during the maintenance period shall be provided by the contractor. c). Prior to the end of the Maintenance Period, the Contractor shall submit a schedule of recommended spare parts (including those recommended by the equipment manufactures) with the respective current price lists indicated. d). Exact quantities of all spare parts and consumable material used during the entire Maintenance Period shall be properly recorded and handed over to the Employer before the end of the Maintenance Period prior to the release of the Retention Monies. e). The Contractor shall, prior to the release of the Retention Monies, hand over to the Employer free of charge the total quantity of spare parts and consumable material used \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 171 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection during the last six (6) months of the Maintenance Period. These spare parts and consumable materials shall be over and above those specified in the other sections of the Specification. f). In addition to the spare parts specified elsewhere in the contract documents, the following spare parts shall be provided and handed over to the owner six months before the completion of the Maintenance Period or Defects Liability Period. No. 1 2 3 4 5 6 7 8 9 10 11 12 17.19 Item Indicating lamps Fuse cartridges for each Rating of TP Fuse Switch or Switch Fuse Nozzle Sprinkler head Hose (40mm diameter) Hose (65mm diameter) Consumable Materials Pressure Gauge Motorised Actuator Motor Starter Contactor Pressure Sensor BMS Control Module Quantity All colour and sizes used 3 nos. of each 4 30 each installed type 2 2 Sufficient for six (6) month Operation 2 1 set of each installed size & type 10 pcs. Of each installed type 5 pcs. Of each installed type 5 sets of each module type TRAINING At the time of completion allot a period of not less than three working days for instructing operating and maintenance personnel in the use of all systems. All personnel shall be instructed at one time, the contractor making all necessary arrangements with the manufacturer’s representatives to provide instruction, product literature and application guides for the user’s reference. 17.20 MAINTENANCE PERIOD Free Operation: The Contractor shall include/allow for operation of all equipment and plant on behalf of the Owner (24hrs basis) for a period of six (6) months after the commissioning of the equipment/systems. The commencement of the “Free Operation” period will be directed by Project Manager. (Defects Liability Period shall also mean Maintenance Period) a. During the Maintenance Period, the Contractor shall provide a 24 hour “call-out” service to repair any equipment. b. Immediately answering the breakdown calls, the Contractor shall attend to such calls within a maximum time limit of 2 hours during night and 1 hour during daytime of receiving such calls. c. During the Maintenance period, the Contractor shall at his own cost remedy and make good with all faults or defects in the Works, which in the opinion of other Architect/Engineer, is due to faulty materials, workmanship or design. The Contractor \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 172 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection shall indemnify the employer and/or the Main Contractor against any damage or injury to the Building contents and/or occupants arising from such faults or defects. d. If the Contractor fails to remedy such faults or defects within a reasonable time, the owner may proceed to do so at the expense of the contractor and without prejudice to such other right as the Employer may have under the Contract. e. The Contractor shall also refer to other requirements in the relevant clauses of the Main contract. The Contractor/Contractor shall keep spare parts for maintenance and fault rectification throughout the maintenance duration to minimize system down-time. 17.21 The Contractor/Contractor shall provide warranty for the rectification work and replace parts . COMPREHENSIVE MAINTENANCE DURING MAINTENANCE PERIOD a. The Contract shall include free comprehensive maintenance of all Works during the Maintenance Period. b. During the maintenance Period, the Contractor shall provide, without charge, labour and materials for the comprehensive maintenance required to properly maintain and operate all Works installed, and for the provision of twenty-four (24) hour ‘call-out’ service whereby at any time of the day or night, the Contractor shall dispatch skilled men to attend to defective equipment. c. The maintenance works shall include, but not be limited to the following: I) Maintain the entire Works included in this Contract, taking into account the Employer’s operational requirement II) Replace or repair all components of equipment as necessary to maintain the installation in good working conditions. III) Maintain a log book for all maintenance, repair, replacements and inspection that has been carried out. The log book shall be properly kept and made available for inspection by the employer IV) Regular comprehensive maintenance keeping all installation in a first class operating condition V) Regular inspection of the installation. Any parts required to be replaced during these inspections, and during the entire maintenance Period shall be supplied and installed at the Contractor’s expense. d. The servicing and maintenance works shall also be in accordance with the requirements stipulated by all the by-laws, rules, regulations and requirements of the local Authorities. e. The Contract shall include the service of an appropriate Licensed Electrical Engineer/Authorized Switching Engineer to take change of all the electrical installation for licensing purposes, and payments of licensing fees, etc. during the Maintenance Period. The Licensed Electrical/Authorized Switching Engineer shall also attend all breakdown or emergency calls required by the Employer. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 173 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 17.22 OPERATION AND MAINTENANCE INSTRUCTIONS MANUAL a. The Operation and Maintenance Instruction manual shall be in A4 size paper and be bound in rigid covers covered and engraved with lettering giving the Owner’s name, project name, Contractor, Architect’s name and the Engineer’s name. b. Final draft manuals must be submitted for the Consultant/PM review before Completion Certificate is issued. After acceptance by the Consultant/PM, the Contractor shall submit five (5) sets and soft copy of the manual for record before completion certificate is issued. c. In general, each manual shall consist, but not limited to the following section: 1). General This section shall include the purpose of the manual and brief description of the manual directory. 2). System Description This section shall include the following as a minimum: i) Description of the overall system. ii) General operation of plant, starting up and shutting down procedures,location of each equipment, normal and emergency operation of system/equipment, control settings and tolerances. iii) Size and capacity of all the major equipment and components of the system. iv) The proposal initial setting of protective devices and other adjustable components of the system. Space shall be reserved for the insertion of final commissioned and accepted settings. v) Normal sequence of equipment and plant operation and alternative sequence to maintain operation of part of the total facilities during abnormal circumstances. 3). Technical Specification This section shall include the technical descriptions and functions of all and components and shall generally include: equipment i) Schedules of equipment showing quantities, locations, types, operating duties. ii) Technical description of all systems and equipment, including circuit diagrams of each printed circuit board and component layout diagram for each printed circuit board installed for this project. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 174 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection iii) Wiring diagrams iv) Manufacturer’s drawings v) Equipment list, stating the make, model, serial number, accepted settings (after commissioning). vi) Catalogues, certificates and performance data sheets for all equipment. i. Maintenance This section shall include the required operating and maintenance procedures of all the equipment. This shall include the following as a minimum:1. 2. 3. 4. Inspection manual for all system/equipment; Operation manual for all system/equipment; Procedure of changing components of equipment regular replacement; Maintenance instructions, calibration procedures and fault finding instructions for all systems; 5. Precautions when carrying out operation and maintenance procedures; 6. Storage and inventory systems; and 7. Procedures for system fault finding. ii. Safety This section shall include the following as a minimum:1. Proper procedure of equipment operation; 2. General description of plant hazards, where appropriate, including the following :a). Protection against electrical hazards; b). Protection against mechanical and physical hazards; c). Protection against fire and explosion hazards; d). Protection against chemical hazards; f). Protection during fuel and chemical handling; and g). First aid and accident reporting iii. Directory of supplies This section shall list the name of suppliers and agents of each type of equipment, materials and accessories. Correspondence address, telephone number, fax number, pager number, and Email address shall be included. iv. List of Spares This section shall list of all the spares, consumable materials, and maintenance tools that will be maintained and kept to ensure continued satisfactory operation of the equipment and systems. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 175 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection v. Organisation of Maintenance Team This section shall include detailed organization of the Maintenance team deployed for the maintenance Period with names and CV’s, of all key staff. Contact telephone or pager numbers for emergency and/or twenty-four (24) hour call shall also be included. vi. List of As-Built Drawings This section shall contain a full list of all “ as-built” and “as-manufactured” drawings. 17.23 ADJUSTMENTS DURING MAINTENANCE PERIOD a). The Contractor shall carry out at his expense all necessary retests and adjustments to the plant and equipment to attain the specified performance and conditions of operation prior to the completion of the Maintenance Period. b). These adjustments need to be made while the building is occupied. The Contractor shall, without any extra cost, carry out these adjustments at the convenience of the Employer and outside normal working hours, if necessary. \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 176 BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection 18.0 REFERENCE MANUFACTURERS Tenders shall give the brand name/model of each item listed below. Catalogues and technical literature shall also be submitted together with any illustrations or drawings necessary to fully describe the offer. The below lists of manufacturers are for reference only do not restrict the contractor to propose a different brand. We are open to approve equivalent materials based on their compliance to technical requirements. The approval or otherwise of the technical data given shall in no way be deemed to relieve the sub-contractor of any of his obligations under Sub-contract. PT. MEINHARDT INDONESIA NO I. MATERIAL / COMPONENT MANUFACTURER/ BRAND NAME 1. PLUMBING AND SANITARY Plumbing Pumps (complete with local panel) 2. Butterfly Valve AFA, Fivalco, Hattersley, Tyco 3. Gate valve and/orball valve not exceeding 65 mm diameter (brass body) AFA, Fivalco, Hattersley, Tyco 4. Gate valve exceeding 65 mm diameter (body : ductile/Cast Iron) AFA, Fivalco, Hattersley, Tyco 5. Check valve not exceeding 65 mm diameter (bronze) (wafer type ) AFA, Fivalco, Hattersley, Tyco 6. Check valve exceeding 65 mm diameter (C.I.) Wafer type AFA, Fivalco, Hattersley, Tyco 7. Globe Valve AFA, Fivalco, CONTRACTOR MANUFACTU RER/ BRAND NAME COUNTRY OF MANUFACTU RE Wilo (ASME), Xylem, Grundfoss \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 177 NOTE BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection PT. MEINHARDT INDONESIA MATERIAL / COMPONENT NO MANUFACTURER/ BRAND NAME CONTRACTOR MANUFACTU RER/ BRAND NAME COUNTRY OF MANUFACTU RE Hattersley, Tyco 8. Strainer AFA, Fivalco, Hattersley, Tyco 9. Float valve - pilot type (with double floater) KKK, Socla, AFA 10. PRV KKK, Bayard, Claval 11. Anti return & Lockable Valve Onda, Tyco 12. Water level controller (floatless type) Omron, Telemecanique 13. Rheem, Boyle, Thermor, Ariston, Handal Storage Water Heater (N/A) 14. Cable, Kabelmetal, Kabelindo, Supreme 15. Junction box MK, Panasonic 16. Copper pipe B88 Type L Wolverine, Streamline Mueller 17. Cast iron pipe (Fittings, Ptraps)(shall Green Building Certificate with minimum 3 ticks) Duker, PAM GLOBAL, AFA CIP 18. Pressure gauge AFA, Wise, Nagano 19. Flexible joint AFA, Tozen, \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 178 NOTE BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection PT. MEINHARDT INDONESIA NO MATERIAL / COMPONENT MANUFACTURER/ BRAND NAME CONTRACTOR MANUFACTU RER/ BRAND NAME COUNTRY OF MANUFACTU RE Muraflex 20. Sediment Filter/Sand Removal BWT, UM Filter, Citech 21. Carbon Filter BWT, UM Filter, Citech 22. FRP Tank / Profil Tank (c/w H: 500mm) beam support I-Tank, induro, Biohome, Biodetox 23. Water Hammer Eliminator KKK, Tozen, Sionx 24. Water Hammer Arrester (mini WHA in toilet Units) NSV, KKK, Sionx, klase 25. Membrane filter package (Ultra Filter 0.05Micron) N/A FWA, GE 26. Air Vent Valve AFA, Yoshitake, Samyang, Claval 27. Water Leak Detection System TTK,Tracetex/ Raychem, Aqualeak, Hydrosense 28. Pipe Isolation Isopipe, Insulflex, Armaflex, Thermbreak, K-Flex 29. Digital Water Meter (shall be connected to BMS) Itron, Siemens, Saitec 30. Manual Water Meter (vertical type) N/A Itron, Siemens, Saitec \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 179 NOTE BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection PT. MEINHARDT INDONESIA NO MATERIAL / COMPONENT MANUFACTURER/ BRAND NAME 31. Noise Vibration Control : Floor mounting, Spring Isolator, Hanger (pipe Hanger) Kinetec, Mason, NSV 32. Multi inlet (P-trap) Austindo, Kharisma, AFA CIP 33. Special Floor Drain (for Unit bath room) Viega, Valsir (T58 type), Toto 34. Pharmaceutical Floor Drain (corridor floor drain, corridor data hall, atc) Austindo, Antasan, Kharisma, BMM 35. Scooper Drain (balcony drain and atc) Austindo, Antasan, Kharisma, BMM 36. Roof Drain Austindo, Antasan, Kharisma, BMM 37. Manual Grease Trap (below kitchen sink) Austindo, Antasan, Kharisma, BMM 38. Grease Trap(GT) Austindo, Kharisma, Biohome, Biodetox, BMM CONTRACTOR MANUFACTU RER/ BRAND NAME COUNTRY OF MANUFACTU RE 39. 40. - Vibration mounting, - Inertia base, - NFC Flexible connector pipe vibration - Seismic Inertia base NSV, Kinetec, Tomahawk \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 180 NOTE BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection PT. MEINHARDT INDONESIA NO MATERIAL / COMPONENT MANUFACTURER/ BRAND NAME 41. Sewage Treatment Plant (STP) ii FIRE PROTECTION 1. Fire pump (UL/FM) Fairbank Morse, Aurora, Xylem 2. Jockey pump Grundfos, Fairbank Morse, Xylem 3. Diesel for fire pump (ULFM) c/w fuel tank Clarke, Detroit, Caterpilar 4. Fire pump control panel (UL/FM) Metron, Firetroll, Tornatech 5. Hydrant pillar Lingjack, Zeki, Appron, Quick Fire 6. Siamese connection (4 way breeching inlet) Lingjack, Giacomini, Appron, Quick Fire 7. Indoor/Outdoor Hydrant box c/w Hydrant hose, nozzle, landing valve Lingjack, Zeki, Appron, Quick Fire 8. Fire Extinguisher and Thermatic Fire extinguisher Combat, Yamato, Ansul, Servvo, Quick Fire 9. Clean Agent Fire Extinguisher Combat, Yamato, Ansul, Servvo 10. Gate Valve OS&Y (UL) Tyco, Viking, Fivalco, Victaulic, Reliable CONTRACTOR MANUFACTU RER/ BRAND NAME COUNTRY OF MANUFACTU RE Biohome, Biodetox \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 181 NOTE BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection PT. MEINHARDT INDONESIA NO MATERIAL / COMPONENT MANUFACTURER/ BRAND NAME 11. Silent Check Valve (Wafer Type)Class 10K/16K/ 25K ULFM Tyco, Viking, Fivalco, Victaulic, Reliable 12. Strainer ULFM Tyco, Viking, Fivalco, Victaulic 13. Globe Valve Class 10K, 16K– 25K ULFM Tyco, Viking, Fivalco, Victaulic 14. Alarm Control Valve (ULFM) Tyco, Viking, Fivalco, Victaulic 15. Branch Control Valve C/W Temper Switch (ULFM) Tyco, Viking, Fivalco, Victaulic 16. Sprinkler Head (ULFM) Tyco, Viking, Fivalco, Victaulic 17. Flow meter (for fire pump) Gerand, Tyco, Claval 18. Metal flexible joint (for fire pump) AFA, Tozen, Muraflex 19. Black Steel Pipe Sch 40 / Galvanized Pipe sch 40 SPS, Bakri. 20. FITTING > 65mm (joint coupling) Victaulic, Shorjoint, Tyco 21. Fitting > 65mm Benkan,FKK, Pantech CONTRACTOR MANUFACTU RER/ BRAND NAME COUNTRY OF MANUFACTU RE \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 182 NOTE BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection PT. MEINHARDT INDONESIA NO MATERIAL / COMPONENT MANUFACTURER/ BRAND NAME 22. FITTING ≤ 50 mm TSP, Galunggung 23. PRV Full Port (UL) Victaulic, Singer, KKK 24. Individual PRAV for Indoor Hydrant (Pressure Restricting Angle Valve) 40mm & 65mm Combat, Giacomini 25. Flow Switch ULFM Tyco,Viking, Potter 26. Pressure Gauge AFA, Wise, Fanal 27. Automatic Air Vent ULFM Claval, Potter 28. Fire Stop Hilti, Armachell, Intumex, 3M, Promat, 29. Fire Resistant Cable SCM, Sigma, Draka, Leony 30. Foot Valve Ebara, Mizu 31. Test Drain Valve or ITV Tyco, Viking, Fivalco, Victaulic 32. Orifice bronze body Tyco, Viking 33. Helipad protection system (N/A) Tyco, Viking. 34. Pressure Release Valve (ULFM) Claval, Tyco CONTRACTOR MANUFACTU RER/ BRAND NAME COUNTRY OF MANUFACTU RE \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 183 NOTE BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection PT. MEINHARDT INDONESIA MATERIAL / COMPONENT NO MANUFACTURER/ BRAND NAME 36 Seismic Breaching Victaulic, ISAT, HILTI, Cooper. 37 - Vibration mounting, - Inertia base, - NFC Flexible connector pipe vibration, - Seismic Inertia base NSV, Kinetec, Tomahawk 38 Pre-action set c/w caging by costume Victaulic,Tyco, Viking III . Extinguisher Gaseous System (Novec) 1 Cable Power Kabel Metal Cable, Kabelindo, Supreme. 2 Conduit Pipe Ega, Clipsal, Double-H or equivalent, osaka 3 Cylinder and Accessories ULFM Tyco Ansul/Hygood, RG System, Siex, Kidde Tyco Ansul/Hygood, RG System, Siex, Kidde - - Electrical Solenoid Actuator UL & FM With Supervisory monitoring Per NFPA 2001 Y2015 Requirement Manual Actuator UL & FM With Supervisory monitoring Per NFPA 2001 Y2015 Requirement CONTRACTOR MANUFACTU RER/ BRAND NAME COUNTRY OF MANUFACTU RE Tyco Ansul/Hygood, RG System, Siex, Kidde \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 184 NOTE BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection PT. MEINHARDT INDONESIA MATERIAL / COMPONENT NO - - - Pneumatic Actuator UL & FM With Supervisory monitoring Per NFPA 2001 Y2015 Requirement Discharge Pressure Switch ULFM Discharge Hose ULFM MANUFACTURER/ BRAND NAME CONTRACTOR MANUFACTU RER/ BRAND NAME COUNTRY OF MANUFACTU RE Tyco Ansul/Hygood, RG System, Siex, Kidde Tyco Ansul/Hygood, RG System, Siex, Kidde Tyco Ansul/Hygood, RG System, Siex, Kidde 4 Clean Agent Gas UL FM Approval Tyco Ansul/Hygood, RG System, Siex, Kidde 5 Discharge Silent Nozzle (acoustioc Nozzle) <110 dB UL FM Tyco Ansul/Hygood, RG System, Siex, Kidde 6 Intelligent Releasing Control Panel Cap. 1 Loop Up To 10 Releasing Control ULFM Simplex, Notifier, Fike, Kidde 7 Intelligent VIEW laser Smoke Detector ULFM Simplex, Notifier, Fike, Kidde 8 Intelligent Photoelectric Smoke Detector ULFM Simplex, Notifier, Fike, Kidde 9 Fire Alarm Bell & Alarm Notification Device ULFM Simplex, Tyco, Kidde, Fike 10 Manual Release cw Abort Swicth ULFM Simplex, Notifier, Fike, Kidde 11 Warning Sign Lamp Apex or others \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 185 NOTE BDx CGK3 – TBS2, Jakarta Technical Specification – Plumbing, Sanitary & Fire Protection PT. MEINHARDT INDONESIA MATERIAL / COMPONENT NO MANUFACTURER/ BRAND NAME 12 Control Cables (FRC) Leoni Betaflame, JJ Lapp Cable, Pyrotec 13 Detectors Cables and Risers (FRC) min AWG 18 Shielded Twisted Pair (STP) Leoni Betaflame, JJ Lapp Cable, Pyrotec 14. Seamless Pipe Sch 80 API-5L, JIS, ASTM Suma, Nippon Steel, Sumitomo 15 Fitting class 3000 FKK, TSP Suma 16 Aspirating Smoke Detection (ASD) Securiton, Xtralis, HSSD V. LI-ION TAMER System 1. Li-Ion Tamer • • CONTRACTOR MANUFACTU RER/ BRAND NAME COUNTRY OF MANUFACTU RE NOTE Xtralis, Ansul all material submittal shall comply with specifications and standard even brand name specified. Notes for Suppression System :- Bidders should be authorized by Gas systems manufacturer to participate in bidding of this project. Official document to be provided. - Maximum fill quantity per agent cylinder should not exceed 150kgs (due to limitation in lifting equipment) - Filling Pressure of all cylinders cannot exceed 60bars. - Cylinders should be seamless without welding(eliminate possibility of leaking at welded joints) \\192.168.0.234\current_data\Job122\122535 - BDx CGK3 Brown & Green Field\E4\11. Technical Specification\Technical Specification - Plumbing, Sanitary & Fire Protection ( Joko ) R1.doc July 2024 Page 186
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )