Perstorp Penta Elephant
F-9595
S3
Emissions to points (larger sources)
F-3497
To E-9586
Venting connected to incineration
Venting connected to scrubber E-9586
U-1210
H-3495
PW header
(previously 40 m³)
P-3900
Air cond
Venting through dust filters (minor source)
T-1215
V-3900
PW 12 m³
Venting to atm (minor source)
P-3910
PC70 header
PC40
S/F-1230
V-1230
PC40 header
Formic Day
Tank
V-3140
/90
2m³
U-3230/35
P-3225
20 ton/h
V-3050
Recov. FA %
P-3000
230 m³
H-3005 A/B
Mixed FA
195 m³
CW
H-3115
V-3100/50
E-3220/
21/22
V-3200
RKL
230 m³ P-3200
144°C
57 ton/h 140°C
C-3310
Stripper
3 barg
H-3303
4,5 ton/h
45 m³
3 lines + one future
P-3290
14 ton/h
H-3301
H-3028
Air cond
H-3320
Steam
Reboiler
152°C
V-3322
H-3302
80°
H-3340
MVR Reboiler P-3390/92
P-3340
122°C
Acet
~240 m³
V-1310
HCOOH 85%
P-1310
100 m³
Atm S3
V-1410
V-9530
E-1430
scrub
HCl 20%
40 m³
H-3306
15 ton/h, 140°C
C-3020
MeOHdest
atm
E-3021
H-3022
P-1110
FA unload
P-1014
P-1001
Acet unload
P-1301
P-1401
FAC unload
HCl unload
P-1410
H-3035
Out of scope, remove
V-3030
Cafo Tube
Chain Elev.
25kg
Cafo
Filtrate
Tank
Area 81
SML
V-3930
SMC
Steam Condensate
Tank
V-9520
120 m³ ML
SML
BB
T-34xx
18 m³
ML Buffer tank
/Boil out storage tank
SMM
P-3030
scrubber
(to V-3975)
V-3430
ML
300 m³ P-3560
SML
S/F-3880
P-3402-4
V-3560
WWTP
Cafo-silo
44 m³
dryer
P-3430
E-3040
scrub
truck loading possible
S4
S7
S/F-3490
V-3490
P-3412 P-3410/11
P-3391
H-3030
Recov.MeOH
P-9530
30 m³
atm
U-3470
thickener
loop
V-1010
P-1101-03
H-3402-04
P-3312
PC40
atm
atm
E/F-3475
T-3420
E-3410
13 ton/h, 176°C
PGCafo
lump breaker E-3491
P-3912
Pusher
Centrifuge
U-3420
/25
SMM
H-3305 A/B
93°C
96°C
RKL Cleaning
Recycle Tank
N2
FA 37%
2*1100 m³
T-3480
AHU
12,5
m³/h
H-3912
Cafo
Crystalizer
E-3401
atm
1,7 barg
H-3390/92
space for adding reboiler
160 m³ 50°C
ton/h
h,ø= 6000mm P-3300 15100°
C
Cleared RKL
Buffer Tank
19 ton/h
V-3290
P-3210/11
V-1110/11
Various
rotary valves
not shown
H-3440 A/B ML
Cafo
E-3390
Evaporator
U-3330
MVR-1/2
U-3335
116°C
V-3300
Sand-filter
E-3210/
11/12
F-9592
SML
CW
H-3304 A/B
RKL Sludge tank
2 lines+space for 2 more
Add pipeline from Balaji
45 m³
P-9540
Lamella
Seperator
Reactor
75 m³ P-3100
A-3102/52
P-3150
P-3050
H-3742
18 ton/h, 155°C
V-9540
P-3142
All VOC vapor incinerated
CW
H-3652
SML
HW60 header
CW
~60°C
H-3552
H-3910
H-3302 RKL
thickener
55°C
CaOH metering
P-1250/70
V-3000
HW95r
H-3760
via H-3440
WWTP
H-3450
HW95
H-3921B
RKL Decanter
E-3225
V-1250/70
101°C
CW
scrub
H-3921A
SW
H-3455
WWTP
15 ton/h, 124°C
Atm
PC 100 m³
P-3920 A/B
PC header
T-1240
60/62
V-3920
H-3920
CW
(under review)
S2 E-9505
V-3922
Process Condensate
Receiver
boiler
feed water
CW
CaOH hopper
32 m³
H-3913
80 m³/h
H-3922
Incoming water
Area 82
boiler/ incin.
P-9520
ML Storage Tank
Area 83
CW
P-3025 P-3022
CW
Methanol
V-1510
NaOH 50%
30 m³
Area 84
ETP
P-1501
NaOH unload and forward to ETP
inc.
H-3502
P-3502
E-3506
inc.
inc.
SMM
E-3505
V-3510
inc.
Penta
Crystlizer-2
E-3504
40°
Penta
Crystalizer
H-3652
CW H-3540
E-3701
65°
HW95
Crude Penta
suspension Tank
H-3515
inc.
P-3501
V-3525
mother
liq.
P-3504
V-3530
wash liq.
V-3535
wash
water
V-3550
V-3540
Belt
water
collect
105°
SML
10 m³
V-3600
HW95
P-3550
H-3552
P-3515
SML
300 m³
SMMSMM
E-3610
/20
carbon
filter
Alternative
Pe-ML
210 m³
H-3742
P-3725
U-3770/71
HW95
E-3730-35
P-3750
PE-ML Buffer
storage tank
PE-MIX
Filter Press
U-3785
Penta Mix
Decanter-1/2
Sieve
sludge
solids
P-3774
60°
filtrate
T-3790
HW95
V-3720
V-3740
V-3760
45 m³
2,4 m³
7,5 m³
P-3720
Mono ML Buffer
Tank
P-3724
SML
E/F-3826
scrubber
(to V-3970)
P-3740
Over size from
Sieve tank
Pe-silo
60 m³
E/F-9585
scrubber
Area 89
chilled water
(for HVAC)
T-38xx TBD
U-3825
V-3970
dryer
exch.
Dust dissolv.
& Pe-rewk. P-3970
BB
V-3975
V-9510
V3615
P-3978
Ion exch. rinse
70 m³
P-3615
Gutter & CafoP-3975
rewk.
E-3980
WWTP
H-3760
P-3760
Decanter Feed Tank
E-3791
V-3780
33 m³
P-3780
Filter Press
Feed Tank
E-3890
Rev.
Date
Doc-ID: E-PE-DWG-PFD-10039.pdf
By
WIP
2018-02-27
For approval
Znp
A
2018-03-01
Issued for BE
Znp
B
2018-03-16
Issued for BE / new ID for 3140 & 3615
Znp
C
2018-05-29
New dryers, new ID for P-1014, V-3490
Znp
D
2018-08-13
Bagging details added
Znp
E
2018-10-11
Scope change modifications
Znp
F
2018-11-29
Details corrected, vent system added
Znp
F
2019-11-21
Details corrected, tag numbers & volumes
Znp
Checked Appr.
V-9400
Pim
Pim
Not yet issued
Area 87
fuel handling
(gas & oil)
/sanitation
V-3750
SML
SML
V-3840 S/F-3840
S5
atm
S8
Emergency showers
CPF purge
H-3725
E-3724
45°
atm
25kg
WWTP
inc.
N2
P-3701/11
E-3615
scrub
Alternative
E-3721
E-3630
/40
ion
P-3600
H-3606/08
Atm
Penta Crystalizer
T-3820
Area 86
E-3831
over size
screen
atm
Various
rotary valves
not shown
Penta Purification
Buffer Tank
Hot Crude
Buffer Tank
Penta
Crystalizer
Tube Chain
Elevator
PE-Pusher
Centrifuge
U-3710
/15
P-3650 40 m³
CW
sat. Pe-solution
90 m³
P-3500
E-3708/13
Hydrocyclone
P-9586
V-3650 PE-Condensate
Storage tank
PW / PC70
belt & cloth wash
U-3515
V-3500
SML
T-3830
WWTP
at times
Vacuum Belt Filter
E-3501
AC
E-9586
scrubber
V-3705
WWTP
at times
Area 85
F-9590 S6
P-3702
P-3505 H-3506 H-3505
Penta
Crystalizer-1
atm
PW
H-3702
Containments & pits