# SAUDI ARAMCO ID/PIEU-31-Dec-2022 - REV.2022.12.00 (Standards Cutoff - December 31,2022) Rev 86 SAUDI ARAMCO TYPICAL INSPECTION PLAN APPROVED DATE DISCIPLINE: Civil & Mechanical Structural Steel-Piperack, Steel Supports & Miscellaneous* Steel Structures (* Incl. Piping Supports per Specification) SATIP-M-001-01 31-Dec-22 PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR ITEM NO. PROJECT PHASE & Activity Code 1.0 DOCUMENT REVIEW TASK / ACTIVITY QUALITY PROCEDURE Procedure for Localized Heating for warpage repair (CSD approval reqd) Procedure for Steel Pile Driving (Pipe, Steel Shapes such as H, etc) 1.2 1.3 INSPECTION RESPONSIBILITY ASSIGNMENTS REMARKS SAUDI ARAMCO SAIC-M-2001 RH RH SAIC-M-2002 SAIC-M-2002 RH RH See Item 3.11 thru 3.14 for welding related repairs SAIC-M-2022 SAIC-M-2022 RH RH Refer to applicable SATIPs for NDT, Welding, Coating and develop QC forms & logs for this activity SAIC-SR-01 SAIC-SR-01 RH RH Utilize Pre-qualified WPS per AWS D1.1 (2004) or existing WPS from earlier editions. See Items 3.11 thru 3.14 for welding & related repairs RH Use Pre-qualified WPS per AWS D1.1 (2004) or existing WPS from earlier editions. *ALL Repairs require authorization by Engineer and the Authorized SA Inspector. Implementation is the responsibility* of QA/QC Mgr. & Engineer. 1.4 Procedure for Structural Steel Welding (SA PID Approval req'd) 1.5 Procedure for Structural Steel Welding & *Repairs (*Splice welds, Common SAIC-M-2012 repairs, Bolthole misalignment & relocation, Repair welding defects, & AWS D1.1 Inspection Reqmts. 2.0 QUALITY RECORD MECHANICAL- Structural Steel CNTRCTR Procedure for Tightening of High Strength SAIC-M-2001 Bolted connections 1.1 SAIC-M-2012 RH MATERIAL RECEIVING 2.1 Structural Steel Shapes and Plates SAIC-M-2003 SAIC-M-2003 H W SA shall be notified for the first batch of deliveries. 2.2 Bolts, Nuts and Washers SAIC-M-2021 SAIC-M-2021 H W SA shall be notified for the first batch of deliveries. 2.3 Fabricated Steel Structures SAIC-M-2004 SAIC-M-2004 H W SA shall be notified for the first batch of deliveries. 2.4 Storage, Handling & Preservation SAIC-M-2005 SAIC-M-2005 H S 3.1 Inspection of Support Foundation prior to Structural or Equipment Installation SAIC-M-2006 SAIC-M-2006 H W 3.2 Field Weld connection inspection 3.3 Structural Alignment prior to Grouting SAIC-M-2007 SAIC-M-2007 I S 3.4 Grouting 3.5 Repair/Correction of Errors of Structural Alignment (No welding) 3.0 INSTALLATION Saudi Aramco: Company General Use # 31-Dec-22 SATIP No. Refer to SAES-M-001 Sec. 4q for multi-level steel strcutures modular construction system Refer to Items 3.11 -3.14 below USE SATR-M-2001 Refer to SATIP-Q-010-01 SAIC-M-2008 SAIC-M-2008 I Saudi Aramco: Company General Use W See SAIC-M-2012 for welding related repairs & any Required NDE resulting (Correction of errors) # SAUDI ARAMCO ID/PIEU-31-Dec-2022 - REV.2022.12.00 (Standards Cutoff - December 31,2022) Rev 86 31-Dec-22 SATIP No. SAUDI ARAMCO TYPICAL INSPECTION PLAN APPROVED DATE DISCIPLINE: Civil & Mechanical Structural Steel-Piperack, Steel Supports & Miscellaneous* Steel Structures (* Incl. Piping Supports per Specification) SATIP-M-001-01 31-Dec-22 PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR ITEM NO. PROJECT PHASE & Activity Code TASK / ACTIVITY Pre-Installation Procedure Verification Testing of Turn-of-Nut Method ASTM A325 or ASTM A490 Bolts 3.6 Pre-Installation Procedure Verification Testing of DIRECT TENSIONING INDICATOR (ASTM A325/A490 Bolts) Pre-Installation Procedure Verification Testing of Calibration Wrench* ASTM A325 or ASTM A490 Bolts 3.7 3.8 QUALITY PROCEDURE QUALITY RECORD INSPECTION RESPONSIBILITY ASSIGNMENTS CNTRCTR SAUDI ARAMCO SATR-M-2002 SATR-M-2002 H H SATR-M-2003 SATR-M-2003 H H SATR-M-2004 SATR-M-2004 H H MECHANICAL- Structural Steel REMARKS *SA is notified for INITIAL bolt tightening activities. Use With applicable SATRs in previous steps. 3.9 Final bolt tightening insp & testing SAIC-M-2009 SAIC-M-2009 I W 3.10 Inspect Access Structure Installation SAIC-M-2010 SAIC-M-2010 I W 3.11 AWS D1.1 Application incl Repair Pre-Welding Inspection SAIC-M-2012 SAIC-M-2012 I W Refer to the applicable SATIP for NDE 3.12 AWS D1.1 Application incl Repair In-process Welding Inspection SAIC-M-2012 SAIC-M-2012 I W Refer to the applicable SATIP for NDE 3.13 AWS D1.1 Application incl Repair Post Welding Final Inspection SAIC-M-2012 SAIC-M-2012 I W Refer to the applicable SATIP for NDE 3.14 NDE Of Structural Steel (AWS D1.1) Selection & Performance of NDE including any repairs. SAIC-M-2012 SAIC-M-2012 I W Refer also to the Applicable NDE SATIP for NDE. NDE* Follows NDE Process Control Procedure. 3.15 Painting/Coating and touch up SAIC-SR-01 SAIC-SR-01 4.1 Structural Re-Instatement/Final Punchlisting SAIC-M-2011 SAIC-M-2011 4.2 Mechanical Completion Punch listing 4.0 Refer to applicable SATIP-H series PRE-COMMISSIONING H SATR-A-6133 W List Final MCC Exception Items, Use SATR-A-2011 or SATR-A-6133 (FEIL) or other document agreed on. H Clear any MCC Exception Items, SATR-A-6133 (FEIL) or other document as agreed on. GENERAL NOTES NOTICE (SAEP-1160- July 10,2011 , Section 9.2): Use of Welding and NDT SAICS 9.2.1 One SAIC per day per activity is required for production welding on a daily or continual basis, e.g., fit-up, in-process, and final inspection. Applicable weld numbers must be entered in Remarks Box on the appropriate SAIC. 9.2.2 Special welding activities such as branch connections, tie-ins, sleeve installation, hot-tap welding, and temperature tie-ins will require a separate IR per weld per activity in accordance with the applicable SATIP. Structural steel Repairs (by Welding) are a special activity. 9.2.3 NDT subcontractors must complete NDT Checklists on a daily basis per above but not as an IR with the exception of the start of NDT activities. Follow NDE Process Control procedure. 1 The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels of Saudi Aramco participation based upon the Contractor’s performance. Saudi Aramco: Company General Use # Saudi Aramco: Company General Use # SAUDI ARAMCO ID/PIEU-31-Dec-2022 - REV.2022.12.00 (Standards Cutoff - December 31,2022) Rev 86 31-Dec-22 SATIP No. SAUDI ARAMCO TYPICAL INSPECTION PLAN APPROVED DATE Structural Steel-Piperack, Steel Supports & Miscellaneous* Steel Structures (* Incl. Piping Supports per Specification) SATIP-M-001-01 31-Dec-22 PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR ITEM NO. 2 3 4 5 PROJECT PHASE & Activity Code TASK / ACTIVITY QUALITY PROCEDURE INSPECTION RESPONSIBILITY ASSIGNMENTS QUALITY RECORD CNTRCTR SAUDI ARAMCO MECHANICAL- Structural Steel REMARKS Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization. Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, inspection or test shall be performed as scheduled if QA/QC org rep is not present. Hold: QA/QC org shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance. If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco. LEGEND H Hold Point for QC Inspection/ Test R Review of Documents W Witness Inspection/Test RH Review and Approval of Documents Saudi Aramco: Company General Use # DISCIPLINE: Civil & Mechanical Saudi Aramco: Company General Use
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )