RUWA Construction and Development Co
DAILY HSE INSPECTION CHECK LIST
Date of Inspection:
1.
S/N
1.a
1.b
1.c
1.d
1.e
1.f
1.g
2.
S/N
2.a
2.b
2.c
2.d
2.e
2.f
2.g
DOCUMENTATION AND SAFE SYSTEMS OF WORK
REQUIREMENTS
YES
Toolbox talks completed
Are MSDS in place?
Work instructions are communicated
Risk Assessments and Method Statements are
being followed?
All necessary Third-Party Certificates are in
place
All tools and equipments inspections have
been completed
Waste Manifest is in place & recorded.
WELFARE
REQUIREMENTS
YES
Drinking water has been provided in clean
containers
First Aiders are available
Rest Areas are clean and well maintained
Hand Soaps are provided.
Adequate cleaning materials are provided in
the toilet.
All electrical wire / cables are free from
defects & good condition.
Signages are provided
NO
ACTION REQUIRED
NO
ACTION REQUIRED
REQUIREMENTS
YES NO
Adequate waste bins have been provided and
are emptied to a suitable location daily
Fixed trip hazards and/or changes in level are
clearly marked/highlighted
Work areas are maintained in a reasonably
condition
Combustible debris and waste are cleared on a
regular basis (at least daily)
Spillage have been recorded and cleared away
Waste segregations is being followed
Food waste is removed from site
ACTION REQUIRED
3.
S/N
3.a
3.b
3.c
3.d
3.e
3.f
3.g
HOUSEKEEPING
4.
S/N
4.a
Time:
ACCESS AND EGRESS
REQUIREMENTS
All access and egress routes are clear and free
from obstructions
Revision 00
YES
NO
ACTION REQUIRED
RUWA Construction and Development Co
DAILY HSE INSPECTION CHECK LIST
4.b
4.c
4.d
All emergency access routes are clearly
marked and lead to a place of safety
Hand/guard rails are provided on steps/stairs
Access to the working areas is of an
appropriate means.
5.
S/N
5.a
5.b
5.d
5.e
5.f
5.g
5.i
5.j
GENERAL ITEMS
REQUIREMENTS
YES
HSE Induction completed for new employee?
All site mandatory PPE is being used?
(Helmet, safety shoes, safety glass, gloves &
safety vest)
All exposed edges are protected
All un-denailed wood is removed
Cables are supported an insulated ‘S’ hooks or
non-conductive material
All temporary structures are adequately
supported/properly
All lifting activities has been demarcated &
safety signages provided
All lifting tools & equipment has been
checked
Inspection completed by
Revision 00
NO
ACTION REQUIRED
Reviewed by