LIEN LAP WIND FARM PROJECT package : EQUIPMENT OF LIEN LAP WIND POWER PLANT - QUANG TRI PROVINCE items: CRANE AND INSTALLATION OF WIND TURBINE GENERATORS WORKING DRAWINGS LIFTING THE WTG'S COMPONENTS AT HARDSTAND Sep., 2020 IBS-JOINT STOCK COMPANY Tower base(85t) 42.5t Tackles 0.5t .% of capacity Capacity Counterweight Working Radius pick Slew ccw place pick Slew ccw place INSTALL TOWER BASE Total load 16 m 18m 124T 110 T Tower base(85t) 42.5t Tackles 0.5t .% of capacity Capacity Counterweight Working Radius 00 25 R1 Total load 12m 65.6 T 14 Bottom tower Drive train Middle tower B 3900 Top tower 5450 Middle tower A 46747 15840 8126 7500 5070 0 20424 3994 3900 4950 The max angle of slope : 1% 3244 4950 Hub Pressure on the ground of assembly area : 20(T/m2) 00 10000 Max wind speed 10m/s 0 R18000 4950 SANY SCC 1500D(Light-duty and HLC) Main boom's lenght Max angle Central counterweight Counterweight block and tray Working Radius Hook block (100t) lifting tools weight 9m 10 m 150T Radius 93.5 T 82.4T Crane Capacity 4950 LIEBHERR LTM 1800(TTF) Main boom's lenght Max angle Counterweight Working Radius Hook block(93t) 14 m 800T Radius 139 T Crane Capacity +1.0 m 17910 18000 PROJECT LIEN LAP WIND FARM - STAGE 1 INSTALLATION Drawn by IBS-JOINT STOCK COMPANY Checked by Drawing No LD-1A Approved by Finished 2020 Scale 1/600 Page Sign Paper LD A3 pick Slew ccw place pick Slew ccw place INSTALL TOWER MID A Total load 18m 109 T Tower Mid A(84t) 42t Tackles 0.5t .% of capacity Capacity Counterweight Working Radius 00 25 R1 SANY SCC 1500D(Light-duty and HLC) Main boom's lenght Max angle Central counterweight Counterweight block and tray Working Radius Hook block (100t) lifting tools weight 9m 10 m 150T Radius 93.5 T 82.4T Crane Capacity Tower Mid A(84t) 42t Tackles 0.5t .% of capacity Capacity Counterweight Working Radius Total load 12m 65.6 T R18000 Max wind speed 10m/s Hub 10 00 0 LIEBHERR LTM 1800(TTF)Use load chart 85% Main boom's lenght Max angle Counterweight Working Radius Hook block(93t) 14 m 16 m 800T Radius 132 T 120T Crane Capacity 100 00 00 280 Pressure on the ground of assembly area : 20(T/m2) Middle tower B 3900 4300 4950 Top tower Drive train 3244 3900 4678 Middle tower A 7500 3321 4300 The max angle of slope : 1% 57358 15840 24920 5640 0 1882 +1.0 m 17910 18000 PROJECT LIEN LAP WIND FARM - STAGE 1 INSTALLATION Drawn by IBS-JOINT STOCK COMPANY Checked by Drawing No LD-2A Approved by Finished 2020 Scale 1/600 Page Sign Paper LD A3 Tower Mid B(68.5t)34.25t DEMAGCC2800-1 (600T)/SSL/LSL) Main boom's lenght Fly jib Max angle SL mast lenght Central ballast Counterweight Working Radius Rigging Weight Superlift counterweight Hook block lifting tools weight Total lift weight Safe Working load(75%) Utilization of crane INSTALL TOWER MID B Slew ccw place R1 70 00 36507 R22000 2241 5023 Total load 00 25 R1 6241 82.4T Hub Pressure on the ground of assembly area : 20(T/m2) Drive train Middle tower B 3900 4950 Top tower 3244 Max wind speed 10m/s 28840 Total load 3900 0 00 126000 82.4T 0 00 30 Slew ccw place 7500 2241 12m 65.6 T 10 SANY SCC 1500D(Light-duty and HLC) Main boom's lenght Max angle Central counterweight Counterweight block and tray Working Radius Hook block (100t) lifting tools weight 9m 10 m 150T Radius 93.5 T 82.4T Crane Capacity Tower Mid B(68.5t)34.25t pick .% of capacity Capacity 82.4T Counterweight Working Radius pick .% of capacity Capacity Counterweight Working Radius 15840 24920 5000 The max angle of slope : 1% PROJECT LIEN LAP WIND FARM - STAGE 1 INSTALLATION 200 +1.0 m Drawn by 15000 22000 IBS-JOINT STOCK COMPANY Checked by Drawing No LD-3A Approved by Finished 2020 Scale 1/600 Page Sign Paper LD A3 Tower Top(52.5t)26.26t DEMAGCC2800-1 (600T)/SSL/LSL) Main boom's lenght Fly jib Max angle SL mast lenght Central ballast Counterweight Working Radius Rigging Weight Superlift counterweight Hook block lifting tools weight Total lift weight Safe Working load(75%) Utilization of crane 6333 5023 00 7500 2241 70 R1 33000 12m Total load 280 65.6T Hub 0 Drive train 00 28840 Max wind speed 10m/s Pressure on the ground of assembly area : 20(T/m2) 12 Top tower 3244 65.6T 00 Slew ccw place 00 65.6T 00 40 R2 65.6 T 3900 pick 2085 240 .% of capacity Capacity Counterweight Working Radius Total load 1500 Tower Top(52.5t)26.25t INSTALL TOWER TOP Slew ccw place 126000 SANY SCC 1500D(Light-duty and HLC) Main boom's lenght Max angle Central counterweight Counterweight block and tray Working Radius Hook block (100t) lifting tools weight 9m 10 m 150T Radius 93.5 T 82.4T Crane Capacity pick .% of capacity Capacity Counterweight Working Radius 15840 24920 The max angle of slope : 1% PROJECT INSTALLATION 200 +1.0 m 15000 LIEN LAP WIND FARM - STAGE 1 Drawn by 24000 IBS-JOINT STOCK COMPANY Checked by Drawing No LD-4A Approved by Finished 2020 Scale 1/600 Page Sign Paper LD A3 INSTALL NACELLE Nacelle 67.5 t pick Slew ccw place 5023 .% of capacity Capacity Counterweight Working Radius Total load 9000 2241 1507 2443 R2 4 00 0 DEMAGCC2800-1 (600T)/SSL/LSL Main boom's lenght Fly jib Max angle SL mast lenght Central ballast Counterweight Working Radius Rigging Weight Superlift counterweight Hook block lifting tools weight Total lift weight Safe Working load(75%) Utilization of crane Max wind speed 10m/s 33000 The max angle of slope : 1% R1 70 00 Pressure on the ground of assembly area : 20(T/m2) 30000 0 00 126000 24 102600 Drive train 15840 24920 28840 Hub 200 +1.0 m PROJECT 15000 30000 LIEN LAP WIND FARM - STAGE 1 INSTALLATION Drawn by IBS-JOINT STOCK COMPANY Checked by Drawing No LD-5A Approved by Finished 2020 Scale 1/600 Page Sign Paper LD A3 INSTALL DRIVE TRAIN DRIVE TRAIN 71 T pick Slew ccw place .% of capacity Capacity Counterweight Working Radius 2474 5023 Total load 5500 DEMAGCC2800-1 (600T)/SSL/LSL Main boom's lenght Fly jib Max angle SL mast lenght Central ballast Counterweight Working Radius Rigging Weight Superlift counterweight Hook block lifting tools weight Total lift weight Safe Working load(75%) Utilization of crane 2224 Max wind speed 10m/s Pressure on the ground of assembly area : 20(T/m2) 00 4 R2 0 33000 R1 70 00 The max angle of slope : 1% 30000 35 12600 0 00 240 388 Hub 15840 24920 28840 Drive train PROJECT LIEN LAP WIND FARM - STAGE 1 +1.0 m 200 INSTALLATION 15000 30000 Drawn by IBS-JOINT STOCK COMPANY Checked by Drawing No LD-6A Approved by Finished 2020 Scale 1/600 Page Sign Paper LD A3 HUB(37.58T) pick INSTALL HUB Slew ccw place .% of capacity Capacity Counterweight Working Radius 5023 Total load 3000 7980 DEMAGCC2800-1 (600T)/SSL/LSL Main boom's lenght Fly jib Max angle SL mast lenght Central ballast Counterweight Working Radius Rigging Weight Superlift counterweight Hook block lifting tools weight Total lift weight Safe Working load(75%) Utilization of crane 1997 Max wind speed 10m/s R1 70 00 Pressure on the ground of assembly area : 20(T/m2) 33000 The max angle of slope : 1% 0 00 126000 10 10 00 00 0 0 0 Hub 15840 24920 28840 Hub 22 800 R2 PROJECT 200 +1.0 m 15000 LIEN LAP WIND FARM - STAGE 1 INSTALLATION 28000 Drawn by IBS-JOINT STOCK COMPANY Checked by Drawing No LD-7A Approved by Finished 2020 Scale 1/600 Page Sign Paper LD A3 Blade(25.2T) pick INSTALL 1 ST BLADE Slew ccw place .% of capacity Capacity Counterweight Working Radius 5023 Total load 6500 Max wind speed 9 m/s 17159 5636 DEMAGCC2800-1 (600T)/SSL/LSL Main boom's lenght Fly jib Max angle SL mast lenght Central ballast Counterweight Working Radius Rigging Weight Superlift counterweight Hook block lifting tools weight Total lift weight Safe Working load(75%) Utilization of crane Pressure on the ground of assembly area : 20(T/m2) The max angle of slope : 1% 24920 28840 12600 0 33000 R23 848 15840 PROJECT LIEN LAP WIND FARM - STAGE 1 INSTALLATION Drawn by Finished 2020 Scale 1/600 +1.0 m IBS-JOINT STOCK COMPANY Checked by Drawing No LD-8A Approved by Page Sign Paper LD A3 INSTALL 2 ST BLADE Blade(25.2T) pick Slew ccw place .% of capacity Capacity Counterweight Working Radius 5023 Total load 6500 Max wind speed 9 m/s 17159 5636 DEMAGCC2800-1 (600T)/SSL/LSL Main boom's lenght Fly jib Max angle SL mast lenght Central ballast Counterweight Working Radius Rigging Weight Superlift counterweight Hook block lifting tools weight Total lift weight Safe Working load(75%) Utilization of crane Pressure on the ground of assembly area : 20(T/m2) The max angle of slope : 1% 24920 28840 12600 0 33000 R23 848 15840 PROJECT LIEN LAP WIND FARM - STAGE 1 INSTALLATION Drawn by Finished 2020 Scale 1/600 +1.0 m IBS-JOINT STOCK COMPANY Checked by Drawing No LD-9A Approved by Page Sign Paper LD A3 6500 17159 5636 5023 INSTALL 3 ST BLADE Blade(25.2T) pick Slew ccw place .% of capacity Capacity Counterweight Working Radius R23 33000 848 Total load 12600 0 DEMAGCC2800-1 (600T)/SSL/LSL Main boom's lenght Fly jib Max angle SL mast lenght Central ballast Counterweight Working Radius Rigging Weight Superlift counterweight Hook block lifting tools weight Total lift weight Safe Working load(75%) Utilization of crane Max wind speed 9 m/s 28840 Pressure on the ground of assembly area : 20(T/m2) 24920 The max angle of slope : 1% 15840 PROJECT LIEN LAP WIND FARM - STAGE 1 INSTALLATION Drawn by +1.0 m IBS-JOINT STOCK COMPANY Checked by Drawing No LD-10A Approved by Finished 2020 Scale 1/600 Page Sign Paper LD A3
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )