CONTRACTORS QHSSE MANAGEMENT PROCEDURE Revision -3 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 1 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE TABLE OF CONTENTS 1.0 PURPOSE ......................................................................................................................... 3 2.0 SCOPE............................................................................................................................. 3 3.0 REFERENCE ..................................................................................................................... 3 4.0 ABBREAVIATION & DEFINITIONS .................................................................................... 3 5.0 CONTRACTORS QHSSE MANAGEMENT ......................................................................... 4 5.1 PREQUALIFICATION CONTRACTORS QHSSE CAPABILITY ............................................ 4 5.2 RESPONSIBILITY OF PROJECT KEY PERSONNEL ............................................................. 5 5.3 MOBILIZATION ............................................................................................................... 7 5.4 PROJECT EXECUTION .................................................................................................. 21 5.5 DEMOBILIZATION/ RESTORATION ............................................................................... 23 5.6 INCENTIVES AND VIOLATIONS/ PENALTIES BY LEGAL CONSUL ................................ 24 6.0 EVIDENCE OF CONFORMITY........................................................................................ 25 Revision -3 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 2 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE 1.0 PURPOSE The purpose of this procedure is to describe the methods established and being maintained to monitor Contractors Quality and QHSSE Management System during Prequalification of the contractors Mobilization on award of the contract Execution of the project and De-mobilization or Restoration The main purpose is to ensure that all contractor activities are carried in a safe manner adhering to all QHSSE requirements. 2.0 SCOPE This procedure shall be applicable and binding on all contractor activities inclusive of activities subcontracted by main contractors. 3.0 4.0 REFERENCE ISO 14001:2015 : Environmental Management System Requirements ISO 9001:2015 : Quality Management System ISO 45001:2018 : Occupational Requirements DP-QHSSE-ML-01 : QHSSE Management System Manual DP-QHSSE-ML-02 : Quality Management System Manual OPAL-STD-HSE-01 : OPAL Road Safety Standard OPAL-STD-HSE-02 : OPAL Camp Standard MD 80-2020 : Ministry of Transport, Technology health and safety Management Communications and System Information ABBREAVIATION & DEFINITIONS Company/Daleel : Daleel Petroleum LLC MD : Managing Director QHSSE : Quality, Health, Safety, Security and Environment RFI : Request for Inspection Revision -3 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 3 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE ITP : Inspection Test Plan HEMP : Hazard and Effect Management Process CV : Curriculum Vitae EIA : Environmental Impact Assessment QA : Quality Assurance QC : Quality Control MVI : Motor Vehicle Incident MoU : Memorandum of Understanding QHSSEMS : Quality, Health, Safety and Environment Management System KPI : Key Performance Indicator 5.0 CONTRACTORS QHSSE MANAGEMENT 5.1 PREQUALIFICATION CONTRACTORS QHSSE CAPABILITY Contractors QHSSE capability shall be evaluated by Daleel QHSSE Department prior to the award of the contract. The Contractors shall be ranked based on their QHSSE capability The following documents shall be reviewed in order to assess their QHSSE capability Quality and QHSSE Policies Quality Manual QHSSE Manual Contract QHSSE Plan Project Quality Plan Contractors QHSSE Training Plan / Training Matrix HEMP Register (Risk, Legal and Environmental Impact Assessment Registers) CV of the proposed QHSSE Manager / QHSSE Advisor CV of the proposed QC Engineers / Quality Manager Relevant ITPs, whenever applicable Incident History for the last 5 Years Other QHSSE requirements will be evaluated as specified in the Scope of Work. QHSSE Capability shall be assessed by QHSSE Department and QHSSE Department shall seek the assistance of Engineering Department for evaluating Quality part Revision -3 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 4 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE 5.2 RESPONSIBILITY OF PROJECT KEY PERSONNEL 5.2.1 Daleel Contract Holder Daleel Contract Holder shall be fully responsible for implementation of QHSSE throughout the project. Daleel Contract Holder shall coordinate with Daleel Project Department/ QHSSE Department / Contractor Contract Holder and ensure that all QHSSE Requirements are met with. Daleel Contract Holders shall: 5.2.2 Set an example by making commitment towards QHSSE visible and distinct. Drive effective implementation of QHSSE Project Plan throughout the Project. Ensure implementation of Project Quality Plan Render advice and guidance in implementing QHSSE Ensure the Contractors have copy of Daleel Contract QHSSE Management Procedure & OPAL standards (Camp, Heat Stress and Road Safety) and ensuring that the requirements are adhered. Ensure that activities undertaken within the scope of their contracts are managed in accordance with the Legal requirements and all other requirements stipulated by Daleel procedures and practices. Managing and monitoring of the work with an emphasis to QHSSE requirements. Review and approve Contractor’s QHSSE Management Plan. Provision of QHSSE certificate as per Appendix 1 Provision of Site Restoration Certificate Participate in QHSSE audits, incident investigations, meetings and reviews in accordance with project specific QHSSE plan and Project Quality Plan Providing leadership in reporting and investigating incidents Daleel Site Representative Daleel Site Representative shall be site based and shall be responsible for day to day activities being performed Daleel Site Representative shall: Communicate Project QHSSE objectives, monitor its implementation, and drive continuous improvement. Provide advice and support to all HEMP / EIA activity Provide support to emergency response activities. Drive the QHSSE performance improvement through data management reviews and implement corrective actions. Revision -3 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 5 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE 5.2.3 Render guidance to record and maintain QHSSE performance and review / identify / implement actions to improve performance. Ensure their contractors are submitting their monthly QHSSE statistics on monthly basis on the 2nd of each month for the previous calendar month on HSE System (External Portal). Render support and guidance to ensure that all audits and inspections are carried out in time and corrective actions implemented Participate in QHSSE audits, incident investigations, meetings and reviews in accordance with project specific QHSSE plan and Project Quality Plan Contractor Contract Holder Contractor Contract Holder shall be Head Office based or site based depending upon the project specific requirements and shall be responsible 5.2.4 Ensure that activities undertaken within the scope of their contracts are managed safely adhering to quality standards Ensure that sufficient resources are available for execution of the project Ensure that sufficient funds are allocated for smooth running of the project Implement and maintain conditions stipulated by Contractor’s QHSSE Plan and Project Quality Plan Implement all the pre-requisites indicated in Project QHSSE certificate as per Appendix 1 Implement all the pre-requisites indicated in Site Restoration Certificate Participate in QHSSE audits, incident investigations, meetings and reviews in accordance with project specific QHSSE plan and Project Quality Plan Contractor Site in charge Contractor Site in charge shall be site based and shall be responsible for day to day activities being performed Supervision of the Work with an emphasis to QHSSE requirements. Ensure that QHSSE Plan and Project Quality Plan are under implementation based on day to day activities Monitor QHSSE performance against the Contractor’s QHSSE Management Plan Report incident to CSR immediately (verbally) and further report in the required form DP-QHSSE-SP-9.1 within 24 hours/ INTELEX Participate in QHSSE audits, incident investigations, meetings and reviews in accordance with project specific QHSSE plan and project quality plan. Report monthly QHSSE statistics (previous month) to Daleel QHSSE department on 2nd day of calendar month Revision -3 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 6 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE 5.3 Ensure all action items are closed as per the agreed action plan required by QHSSE audits, QHSSE inspections, QHSSE meetings, emergency drills and incident investigation. Changes in resources shall be intimated to CSR as and when called for. MOBILIZATION The Contractor must demonstrate a strong commitment to Quality, Safety, Health, and Environment and must have established QHSSEMS. The Contractor shall be responsible for all aspects of the Contractors and the Contractor Personnel’s QHSSE performance and ensuring that the Contractor have sufficient Quality and QHSSE personnel at the site at all times who are competent and has the authority to implement the Contractor QHSSE system properly. Daleel QHSSE expectations and specific QHSSE practice and procedures shall be communicated and provided to the Contractor. The Contractor shall take into account and shall comply with all Applicable Laws that become effective during the mobilization and execution of the Contract. 5.3.1 Kick off meeting Contract Holder shall then conduct a kick off meeting with the Contractor immediately after Contract award and before the execution of any work. The Contract Holder shall involve QHSSE department during kick-off meeting. This is essential to ensure that all contractual obligations, including QHSSE, are thoroughly and mutually understood and agreed. Daleel shall brief contractor on Daleel QHSSE Standards to be maintained throughout the project. The contractor shall present how they are going to manage all activities in a safe manner. 5.3.2 Contractors QHSSE Plan Contractor shall develop a Preliminary Contract QHSSE Plan as part of its Tender submittal to verify that all hazards associated with the work or services have been identified and that adequate control and recovery measures have been determined. If awarded the Contract, the Contractor shall carry out a complete detailed analysis of all hazards and develop a Contract QHSSE Plan. The Contractor QHSSE Plan shall have action plans such as QHSSE Inspection Matrix, QHSSE Audit Matrix, QHSSE Meeting Matrix and Emergency Drill Matrix. The contractor QHSSE Plan shall identify responsible persons for activities mentioned in the action plan. The contractor QHSSE Plan shall identify target period for each action, mode of documentation and recording the contractor QHSSE Plan shall be reviewed by Daleel QHSSE Department and finally approved by Daleel QHSSE Sr Manager. QHSSE plan is NOT required if the strength of employees deployed for the task is less than 25 employees. The project deploying less than 25 employees shall be categorized as low risk contract. If categorized as low risk contract, development of a Preliminary Contract QHSSE Plan and subsequent Contract QHSSE Plan is not required. However, Contractor with high risks task to be assessed by contract holder to provide QHSSE Plan. Revision -3 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 7 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE Any awarded project, the contractor shall develop QHSSE plan consisting of the following QHSSE MS elements as that of ISO 45001:2018: Leadership and Worker Participation Planning Support Operation Performance Evaluation Improvement KPI Before execution of the project, the developed QHSSE plan shall be submitted to Daleel contract holder for review, approval and endorsement. 5.3.3 Annual QHSE Improvement Plan Contractors shall develop Annual Quality, Health, Safety & Environment (QHSE) Improvement Plan to meet or exceed Daleel expectations. The improvement plan shall be SMART and in line with DP-QHSSE-CP-02.3 Form of Annual QHSSE Improvement Plan DP-QHSSE-CP-02.3, is available and can be used for developing Contractors plan. However, the form provides a clear and concise method for documenting action items, assigning responsibilities and monitoring actions to closure. 5.3.4 Security Requirements 5.3.4.1 Minimum contractor camp requirements Daleel Security acknowledge that no two camps will be identical and therefore appropriate security measures will differ according to the role, location and planned longevity of the contractor camp. However, all the following aspects of security must be considered and addressed by all Contractor Camp Managers/Bosses: Nominated Security Representative - Ensure a suitable individual such as the camp boss is given the responsibility for all security related matters. The nominated individual must establish a working relationship with local ROP and Daleel Field Security Perimeter fence –Provide a secure perimeter fence (Type B), incorporating lockable access points that must be manned during working hours and secured outside of working hours Lighting – Ensure the site and perimeter is sufficiently illuminated to allow visual checks and enable effective CCTV coverage at night CCTV - Provide a basic CCTV camera and DVR to monitor the critical points Exact specification of the systems must be agreed with Daleel Corporate Security prior to installation Revision -3 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 8 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE 5.3.4.2 Minimum contractor yard requirements Perimeter fence - Provide a secure perimeter fence (Type A), incorporating lockable access points that must be manned during working hours and secured outside of working hours Lighting – Ensure the site and perimeter is sufficiently illuminated to allow a visual checks and enable effective CCTV coverage at night CCTV – Provide a basic CCTV camera and DVR to monitor the critical points. Exact specification of the system must be agreed with Daleel Corporate Security prior to installation 5.3.4.3 GENERAL REQUIREMENTS FOR Contractor LOCATIONS In order to fulfil their contractual obligations, it will be mandatory for contractors to implement the minimum level of security measures listed below as stipulated by Daleel within a timeframe agreed by both parties. Failure to do so may lead to or termination of contract. Signage – Contractors must ensure the erection of signs stating the site is patrolled, monitored and alarmed in both English and Arabic Monthly Security Report – Submit to Daleel Field Security identifying any security issues experienced and any security developments or improvements Monitoring & Audit – The contracting company must agree to audit by Daleel Security and abide by any resulting recommendations Security Plan - Contractors should present their Security Plan for approval by Daleel Corporate Security prior to work commencing and abide by any changes stipulated by Daleel Prohibition of Private Vehicles – A key element of Daleel Security Policy is the implementation of Royal Decree No 8/11 - The Issuance of the Oil & Gas Law Dated 24 January 2011. As part of this implementation, Daleel prohibits the presence of private vehicles within the concession. This measure is one of several intended to achieve the requirement of Article 37 that states: “Without prejudice to the provisions of the Labour Law referred to, the Concession Owner shall be required to implement the regulations and take action to protect the workforce in locations where operations take place.” This restriction on the presence of private vehicles will apply to all contractors engaged with Daleel. 5.3.4.4 Audit and review Regular audits and review of security arrangements at contractor camps associated with Daleel operations are at the discretion of Daleel Management. Such inspections will be carried out by Daleel Corporate Security Department personnel. Revision -3 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 9 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE 5.3.5 Sub-Contractors The Contractor shall ensure that all sub-contractors working on its behalf comply with the requirements of this contract QHSSE Requirements. The Contractor shall identify to the Contract Holder all sub-contractors, vendors and suppliers and to be employed in the execution of the contract and demonstrate QHSSE management and control in each subcontractor organization, specify how subcontractors will be integrated into the Contractor's QHSSE Management System, paying particular attention to the responsibilities for and ownership of the management of transport activities and how one contractor services multiple contractors. 5.3.6 Communication Contractor(s) shall: List the typical communication techniques used to make contract personnel aware of QHSSE issues. Examples include: Meetings Personal contact; Notice boards (indicate locations) Newsletters (indicate frequency of issue) Describe typical methods of QHSSE promotion during contracts, e.g.: small ‘give away with QHSSE message. Contractor shall ensure that contractor’s personnel have a good working knowledge of such QHSSE management program, which shall include, without limitation, the following: 5.3.7 A policy statement, which clearly conveys management support for safe and environmentally sound operations An employee orientation program, which includes introduction of each of Contractor’s personnel, regardless of prior experience Smoking Smoking is permitted only in designated area as stipulated by Daleel SAD Policy, DPQHSSE-PY-03. Daleel and Contractor personnel are not permitted to smoke in the living quarter’s area or in locations posted as "no smoking" 5.3.8 Substance Abuse, Dangerous Materials and Firearms Usage of alcohol and mood-altering drugs are prohibited as stipulated by SAD Policy, DPQHSSE-PY-03. Prescription and nonprescription controlled substances, behavior or moodaltering drugs, abuse of is totally forbidden and alcohol being under the influence of any of the substance aforementioned, firearms or weapons, and non-work-related dangerous materials, are adverse to a safe work environment. The purchase, sale, use, distribution and possession of any of the above mentioned items at all facilities of Daleel, is prohibited. The use of any other substance, which causes or tends to contribute to unacceptable Revision -3 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 10 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE Work performance, is also prohibited. Entry into Daleel’s property is conditioned upon Daleel’s right to conduct unannounced searches for such contraband. Without prejudice to Daleel’s other remedies under this contract, any of contractor’s personnel who are in breach of the provisions of this contract shall be removed from the concession and performance of the Work. Drinking of alcohol is strictly forbidden in Daleel’s concession. 5.3.9 Horseplay Horseplay, such as wrestling and practical jokes, etc., can be dangerous and is prohibited at the worksite. 5.3.10 Housekeeping Work areas shall be maintained in a neat and orderly manner. Trash, oil spills, etc., must be cleaned up as soon as possible. Aisles, emergency exits, and controls must be kept free of materials at all times. All wastes are to be properly and safely disposed of. The Contractor shall leave all Worksites clean, orderly and in environmentally sound condition as directed by Daleel. 5.3.11 Clothing and Other Apparel Clothing suitable for the job shall be worn. Long pants and shirts or coveralls shall be worn at all times during the performance of the Work. Ragged or loose clothing and jewelry (rings, watches, necklaces, etc.) are not to be worn when operating equipment or while on the drill floor. Any clothing that becomes saturated with petroleum products or hazardous chemicals should be promptly removed and changed. This is an area to be included in pre-task or pre-job safety meetings and PPE evaluation requirements. 5.3.12 Compressed Gas Cylinders Compressed gas cylinders shall be returned promptly to a suitable storage area after use. They shall not be permitted to lay about the worksite. Protective caps shall be placed over the cylinder valves when not in use or when being transported. Compressed gas cylinders shall be kept away from heat, fire and molten metal or electrical lines. Compressed Gas Cylinders shall not be rolled. They shall be lifted by lifting appliances after securing in a cage or special carrier. The compressed gas cylinders shall be properly labeled. Compressed gas cylinders shall be stored in the upright position and secured to a stationary object or structure. Compressed gas cylinders shall never be used in a horizontal position, as the liquid may be forced out causing a fire hazard or explosion. Compressed air shall not be used for cleaning clothing or parts of the body. If used for other cleaning, the discharge shall not exceed thirty (30) psi and eye protection shall be worn Revision -3 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 11 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE Acetylene and other compressed fuel gas cylinder must be separated from Oxygen or oxidizing compressed gas cylinders by a minimum of 6 meters or by a rated firewall barrier. 5.3.13 Storage, Use and Labeling of Chemicals, Solvents and Paint All chemicals shall be handled, stored and transported in accordance with Chemical Management Guidelines, DP-QHSSE-GL-05. All chemicals, solvents and paints are to be stored in a well-ventilated locker having provisions for containing spilled product. Large paint lockers are to be provided with CO2 or dry chemical fire suppression systems. All chemicals, solvents and paints must be kept in containers, which are clearly labeled as to the respective contents. Material Safety Data Sheets ("MSDS") must be supplied for Contractor Materials supplied under this contract and contractor’s personnel must be instructed about the safe use of the chemicals in accordance with an appropriate written Hazard Communication Program. MSDS for Contractor supplied products must be submitted to Daleel’s QHSSE representative. Protective equipment as outlined in the MSDS must be provided to and worn by potentially exposed contractor’s personnel. Low flash point solvents shall not be used for any washing or cleaning. The use of gasoline, for any purpose (other than its intended use in vehicles) is not permitted at the worksite. 5.3.14 Personal Protective Equipment All PPE shall be used and maintained in accordance with DP-QHSSE-GL-04, PPE Guidelines. The wearing of appropriate personal protective equipment is required on the drilling unit and where hazards exist in the worksite and in all specifically designated areas. The following equipment, meeting the appropriate standard, is to be furnished by Contractor along with appropriate training in the proper use and care of such personal protective equipment. Personal protective equipment or clothing shall meet either ANSI, British Standards or equivalent approved standard for such personal protective equipment where required for such item, and shall include, but not be limited to: Head Protection Eye and Face Protection Foot Protection Hearing Protection Flame Resistant Clothes for Welders Clothing for Handling Hazardous Chemicals Hand Protection Revision -3 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 12 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE Fall Protection As a minimum, the following items of personal protective equipment shall be used and/or worn by contractor’s personnel at all times when working or visiting areas outside of the living quarters area: a. Hard hats and safety shoes or boots b. Safety glasses with side shields must be worn in designated areas c. Hearing protection must be worn in high-noise areas. High noise areas are those, which are identified with posted signs, but also include any area where one must shout to be heard; d. Other equipment, i.e. breathing apparatus, gloves, harnesses or belts, rain gear or chemical resistant clothing etc., must be worn when the hazards to which an individual is exposed dictate their use. 5.3.15 Overhead Work When working overhead, the area below shall be roped off or other equivalent measures taken to protect workers on the worksite. Signs reading "Danger - Work Overhead" shall be posted. Contractor’s personnel shall never pass under a suspended load. 5.3.16 Safety Harnesses and Lifelines Full body safety harnesses and lifelines shall be supplied by Contractor and worn by all workers when working above two meter (2) where it is impractical to provide adequate work platforms. 5.3.17 Non-Destructive Testing (NDT) Radioactive isotopes, x-rays, etc. shall only be used by licensed individuals. All other individuals shall stay clear. Contractor shall ensure that necessary warning signs are posted at the required distance from the testing site. The appropriate certificates are maintained for all radioactive sources. 5.3.18 Safe Working System (SWS) Safe Work Systems include Permit to Work (PTW), Confined Space Entry (CSE), Lock out Tag out (LOTO), Trenching and Excavation. The Contractor is required to be familiar with Operating Location's Safe Working System and all potentially hazardous the Work, including, but not limited to, hot work, confined space entry, and control of potentially hazardous energy. These tasks are to be performed under Daleel authority. For further details refer to Permit to work manual – Document#DP-QHSSE-ML-03 Revision -3 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 13 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE 5.3.19 Hydrogen Sulfide Hydrogen sulfide shall be handled in accordance with DP-QHSSE-CP-03, Hydrogen Sulfide Management Guidelines. Hydrogen Sulfide ("H2S") can be encountered at many facilities. Contractor is responsible for ensuring that contractor’s personnel are properly trained and equipped in accordance with applicable local regulations, or to a recognized industry standard when working in areas where hydrogen sulfide may be encountered due to the nature of the Work. 5.3.20 Fire Protection Contractor shall provide fire protection equipment appropriate for the Work being performed. Smoking is only permitted in designated areas. Any Work that has the potential to produce a spark or open flame (e.g. welding, cutting, grinding, and electrical) in areas where flammable vapors or combustible materials may exist is strictly prohibited. 5.3.21 QHSSE Meetings Regular QHSSE meetings should be held and pre-job "Tool Box" meeting programs should be established. Such QHSSE meetings should be documented and copies maintained by Contractor QHSSE Advisor. 5.3.22 English Language Proficiency The Contractor shall ensure that all the Contractor management and supervisory personnel are proficient in reading and writing of English language (unless agreed otherwise by Daleel in writing). This is critical for all aspects of QHSSE including implementation of procedures, permits to work, training, signs, and emergency response actions. 5.3.23 Electrical Safety The Contractor Personnel working around electrical equipment shall take precautions to ensure that the equipment is de-energized while work is being conducted on or around such equipment. Work that is to be conducted near any overhead power line shall be planned such a clearance of no less than 3 meters is maintained throughout the duration of the job so as to prevent accidental contact with energized equipment. If work is to be performed within a 3 meter radius of overhead energized equipment, the equipment must be de-energized prior to starting the work, unless adequately controlled by the safe work system. Ladders used around electrical equipment should be insulated so as not to be a conductor of electricity. Precautions should be taken to ensure that all equipment used is properly grounded and that accidental contact with ungrounded electrical sources is prevented. Electrical Safety Rules, DP-PD-GL-02 shall be applicable for all PTW related electrical activities. Revision -3 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 14 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE 5.3.24 Contractor’s Camp Camp shall be erected and maintained in accordance with Camp QHSSE Management, DP-QHSSE-GL-02 and OPAL Camp standard OPAL-STD-HSE -02. Contractor’s Camp shall be verified and certified by OPAL to ensure the full implementation of OPAL-STD-HSE -02. Moreover, Contractor’s camp shall be inspected prior to the commencement of the project and it needs approval from QHSSE Manager or his/her representative prior to start the project. The Contractor is responsible for the provision of potable water for the personnel at their camp and worksite, this water must be filtered and chlorinated and comply with the Omani standards for drinking water. Daleel will perform regular analyses of this water to ensure compliance. 5.3.25 Contractor’s Industrial Yard / Workshop Industrial Yard / Workshop shall be erected and maintained in accordance with Workshop and Industrial Yard Management QHSSE Specifications, DP-QHSSE-GL-03. Contractor’s Industrial Yard/ Workshop shall be inspected prior to the commencement of the project and it needs approval from QHSSE Sr. Manager or his representative prior to start the project. 5.3.26 Contractor’s Logistics and Vehicle Contractor’s vehicles and equipment shall be maintained in accordance with Daleel Road Safety Policy DP-QHSSE-PY-04, Road Safety Management Guidelines DP-QHSSE-GL07 and OPAL Road Safety Standard. Contractor’s logistics and vehicle shall be inspected prior to the commencement of the project and it needs approval from QHSSE Sr. Manager or his representative prior to start the project. 5.3.27 Contractor’s QHSSE Training Plan The Contractor shall provide, at a minimum, QHSSE training for Contractor Personnel in accordance with the Minimum QHSSE Training Requirements of Daleel. Contractor Personnel who can provide evidence of having already completed Daleel-approved QHSSE training courses prior to commencing work on this contract shall not be required to repeat such training, except for the purposes of refresher training The Contractor shall maintain an up-to-date list of all personnel employed under the contract, the training courses they have attended and the dates of attendance. For more details, refer to training guideline DP-QHSSE-GL-01 Revision -3 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 15 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE 5.3.28 Contractors Project Quality Plan The Project Quality Plan shall adhere to specifications stipulated by the Contract document. It shall also address all QMS requirements of ISO 9001:2015. The Project Quality Plan shall be reviewed by Daleel QC Engineer and finally approved by Daleel QHSSE Sr. Manager or his representative. 5.3.29 Contractors Inspection Test Plan The relevant ITP shall adhere to specifications stipulated by the Contract document. The Inspection Test Plans shall be reviewed and approved by Quality Manager / Quality Engineers / Quality Control Inspectors 5.3.30 Mobilization of QHSSE Manager / QHSSE Advisor CV of QHSSE Manager / QHSSE Advisor shall be approved by Daleel QHSSE Sr. Manager or his representative. Approved QHSSE personnel shall be deployed prior to the commencement of project related activities. Any replacement of QHSSE Manager/ QHSSE Advisor shall be with the written permission of Daleel Contract Holder. The CV of replacement (QHSSE Manager/ QHSSE Advisor) shall be approved by the Field QHSSE Sr. Supervisor. Upon notification of this approval by Field QHSSE Sr. Supervisor, Contract Holder shall give written permission for the replacement inclusive of replacement during leave QHSSE Advisers Minimum Qualifications NEBOSH International Certificate or equivalent Minimum experience 2-3 years in similar position QHSSE Manager Minimum Qualifications Have Diploma in Health, Safety and Environment or equivalent NEBOSH Diploma is preferable Minimum experience 5-10 years in similar position Comply with any additional competency specified in the contract agreement QHSSE Advisers / Managers shall demonstrate competence in the following areas: Ability to communicate effectively in written and spoken English; Ability to conduct and report QHSSE audits; Training ability in incident prevention; Ability to conduct incident investigations and identify underlying causes; Knowledge of health requirements, rules and regulations, and ability to monitor compliance; Revision -3 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 16 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE Knowledge of environmental requirements, rules and regulations, and ability to monitor compliance and identify ways of reducing environmental impact; Be fully conversant with techniques used in the management of hazards and advising on suitable measures which can be used for preventing and ultimately recovering from accident situations; Be able to facilitate and develop Contract QHSSE Management Plans; Be fully conversant with Daleel QHSSE documents and emergency procedures. 5.3.31 Mobilization of Quality Manager / Quality Engineers / QC Inspectors CV Quality Manager / Quality Engineers / QC Inspectors shall be approved by Daleel Quality Manager. Approved Quality personnel shall be deployed prior to the commencement of project related activities. Any replacement of Quality Manager/ Quality Engineer shall be with the written permission of Daleel Contract Holder. The CV of replacement (Quality Manager/ Quality Engineer) shall be approved by Daleel QA/QC Engineer. Upon notification of this approval by Daleel QA/QC Engineer, Contract Holder shall give written permission for the replacement inclusive of replacement during leave. 5.3.32 Contractors QHSSE Management Obligation Contractor shall submit a MoU making their commitment towards QHSSE visible by signing, Contractors Acknowledgement of QHSSE Obligation, DP-QHSSE-CP-02.1 5.3.33 Road Safety All Road Safety requirements shall be met in accordance with DP-QHSSE-GL-07, Road Safety Management Guidelines and OPAL Road Safety Standards OPAL-STD-HSE -01 All vehicles entering Daleel Concession shall comply with Daleel terms and condition requirements as specified in the Standard Purchase Agreement. Contractor vehicles based on the concession area shall be fitted with speed governors which limits the speed of the vehicle as per the following table: Vehicle type Light Vehicle Heavy Goods Vehicle Revision -3 Maximum Speed Limit (Km/h) Graded 80 Company Blacktop 100 Govt. Blacktop 120 Graded 80 Company Blacktop 80 Govt. Blacktop 100 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 17 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE Vehicle type Light Bus Heavy Bus Maximum Speed Limit (Km/h) Graded 80 Company Blacktop 100 Govt. Blacktop 120 Graded 80 Company Blacktop 100 Govt. Blacktop 100 All contractors’ and sub-contractors’ vehicles shall be fixed with IVMS. Daleel has the right to obtain IVMS access at any time for any vehicles operating inside the concession. Vehicles will be monitored by Daleel QHSSE Department in order to improve the standard of driving and reduce road traffic accidents and injuries. Diesel vehicles only allowed to be driven at the site. The following driving rules will be strictly enforced on Daleel’s concession: All posted speed limits must be adhered to Seat belts must be worn at all times by all passengers and drivers. Headlamps must be switched on high beam during daylight hours when traveling on Daleel’s concession roads. During evening hours, normal headlight rules apply when driving. At camp and at the production facilities on the concession there is a "reverse parking" system, as all vehicles must be backed into their respective parking slot. Vehicles must be parked in such a way as to allow them to be driven forwards when leaving the parking place. 5.3.34 Private Vehicles Daleel is strictly prohibiting the "Usage of Private Vehicles" within Daleel Concession. It is the responsibility of every line management and management of each Contractor working for Daleel projects to provide safe company transportation to their employees based on the required destination to or from Daleel concession bringing of any private vehicles to Daleel concession without prior approval will be immediately dealt as a QHSSE Non-Compliance. 5.3.35 Commuting All contractors shall make commuting arrangements between interior workplace and residence so as to avoid MVI in between. The contractors shall Revision -3 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 18 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE Recognize the risk of employees using private vehicles for commuting between residence and interior work site locations particularly during hours of darkness. Driver increased tiredness and poor visibility had resulted to vehicle collisions and rollovers with serious injuries to persons particularly if made during the night time or early morning before daylight. All drivers shall be alerted about this through driver’s forum For employees the contractor shall provide pre-paid ticket for a seat in an approved public bus transport during shift changes if public transport is available. If public transport is not available the contractor shall make their own transportation arrangements so as to drop the employees in the nearest bus stop of their residence In case of tragic or traumatic personal reason to leave jobsite, Daleel shall organize transport of a staff to his/her residence and such travel must be properly authorized and shall be deemed as work related. All nationals must register their place of residence or any change thereof to site administration personnel. Provision of commuting service or bus ticket shall be implemented based on register. All contractors and their sub-contractors shall comply with OPAL road safety standard. Failure to comply / violation of the earlier stated in regards with contractors commuting made during the contractor period may lead to penalty as stipulated in the annex. 5.3.36 Journey Management Journey Management shall be adhered in accordance with DP-QHSSE-CP-01, Journey Management Procedure. All contractors and their sub-contractors shall comply with The Ministry of Transport, Communications and Information Technology Ministerial Decision 802020 regarding driving hours where driving duration is limited to: 9 hours of driving per day (24 hours). Maximum 10 hours is allowed driving in two days per week. 5.3.37 Waste Management The Contractor will be responsible for handling the disposal of all waste materials resulting from activities at their camp and worksite, for the duration of their operations on Daleel’s concession, in accordance with Omani legislation and Daleel’s policy. Solid non-hazardous waste materials, including but not limited to domestic garbage, cardboard boxes, cans, bottles, wood and empty sacks, should be disposed of in an authorized site concession for recycle or disposal. The Contractor is responsible for providing suitable means of collecting the waste and for providing a vehicle and manpower to transport the waste. All scrap metal should be removed from the camp or worksite by the Contractor, who should provide equipment and transportation to take the scrap to a disposal site authorized by the Public Authority. Drums should be rinsed, have the ends cut off and the Revision -3 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 19 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE bodies flattened by the Contractor prior to delivery to the said disposal site. Contaminated drum rinse water should be collected for proper handling and/or disposal. Vehicle tires must NOT be disposed of in Daleel’s landfill. The Contractor should remove them from the concession to their own premises. Hazardous waste, including but not limited to, battery acid, chemicals, paint and thinners must NOT be disposed of in Daleel’s landfill. The Contractor should remove the hazardous wastes from the concession or put them into leak proof containers and deposit the hazardous containers in a disposal area authorized by the Environment Authority. The Contractor should transport waste oil to a treatment facility authorized by the Environment Authority. Waste oil is not to be disposed of in the landfill. Both Contractor camp and, where appropriate, worksite sewage should be disposed of at a treatment facility authorized by the Public Authority. The Contractor is responsible for providing its camp with a system of sewer lines and a sewage-holding tank. This will also be required for the worksite if it is manned 24 hours per day. Contractor will provide, at its cost, a vacuum truck service to transport the sewage from the holding tank to said sewage treatment facility. The contractor should keep record of the waste consignment note for all type of waste. 5.3.38 QHSSE Certificate The Contractor shall not commence the work or services until Daleel has issued the QHSSE Certificate. The Certificate shall be signed by Key personnel of QHSSE and project representing Contractors as well as Daleel. The QHSSE Certificate form is available in Appendix 1. 5.3.39 QHSSE Obligation The Contractor hereby acknowledges that: They understand their obligations to themselves, their subcontractors and their employees and confirm their intention to comply at all times while working on this contract. They recognize that Daleel QHSSE Advisor and Contract holder can be responsible for only advising the nature of, and methods of controlling, hazards specific to Daleel or work site and that the Contractor shall apply best industry practice to ensure the safety of all involved at all times. The Contract Holder has inducted and advised the Contractor of the emergency procedures, location of emergency equipment, location and use of safety equipment, basic safety rules, hazards and hazard controls, go and no-go areas and access and authorization requirements relevant to the service being performed. Revision -3 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 20 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE The Contractor shall ensure that all their subcontractors and employees are informed of the same and that no person shall be permitted to work on the contract without being so informed. The Contractor has a Health and Safety management system in place, which ensures their compliance and adheres to all QHSSE requirements in connection with this contract. The Contractor agrees to make available for inspection on demand by the QHSSE Advisor, contract holder or Daleel representative or any documentation related to Health and Safety in connection with this contract. Daleel has the right to monitor the Contractor’s activities and carry out a safety audit from time to time during the progress of the contract. Daleel has the right to suspend work at the Contractor’s expense where the Contract Holder is not satisfied that all practicable steps are being taken to ensure the health and safety of employees and others in connection with the contract. The Contractor shall immediately report to Daleel’s authorities in accordance with Daleel’s Incident Reporting and Investigation Procedure of any circumstances which may cause or indicate a dangerous or hazardous situation and any significant accident, injury, illness, fatality, spill or other incidents, including, without limitation, any event which could have resulted in a significant accident, spill, injury, illness or fatality (for example, near misses). The contractor shall ensure that all equipment to be used on the service of this contract shall comply with Daleel specifications. Before beginning work on the contract, the Contractor shall carry out a systematic identification of hazards likely to be encountered and shall develop controls for all those identified as being significant hazards. Daleel Contract Holder Contractor Representative Name of Contract Holder: Name of Contractor: Signature: Name of Contractor Representative: Date Signature: Date 5.4 PROJECT EXECUTION 5.4.1 Contractor’s QHSSE Performance Contractor shall submit monthly reports. Contractor’s QHSSE Performance shall be reviewed by Daleel comparing Target Performance Indicators mentioned in QHSSE Plan and the Actual Performance Indicators achieved as per DP-QHSSE-CP-02.3 Revision -3 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 21 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE Daleel QHSSE department may conduct Contractors QHSSE Performance on the agreed dates with the contractors as per DP-QHSSE-CP-02.3 5.4.2 Incident Reporting It shall be ensured that Contractor is reporting all incidents within agreed time frame inclusive of Near Miss Incidents. Contractors shall send Incident notification in accordance with Incident Investigation Procedure, DP-QHSSE-SP-09 within 24 hrs. on occurrence of the incident. In case of failure of reporting the incident in time NCR shall be issued to Contractor. Contractor shall submit Accident Investigation Report for all medium potential and high potential accidents. In case of failure of submitting the report within 7 days NCR shall be issued to Contractor. 5.4.3 QHSSE Meetings Daleel shall ensure that all QHSSE Meetings scheduled as per Contractor’s QHSSE Plan are carried out and findings of the meeting being implemented. The minutes of meeting shall be submitted to Daleel. 5.4.4 QHSSE Inspection and Audits Daleel shall ensure that all QHSSE Inspections and Audits scheduled as per Contractor’s QHSSE Plan are carried out and corrective actions are implemented. Daleel shall conduct QHSSE Audits on: Roadworthiness Assurance Standards of Vehicles and Equipment QHSSE Standards of Camp/ Accommodation QHSSE Standards of Industrial Yard / Workshop Compliance of Mandatory Training for all employees including Drivers Training Daleel shall conduct Site and facility Inspections on following Contractor activities: Excavation Manual and Mechanical Lifting Hot Works Working at Heights Adherence to PPE Fire Fighting Equipment Waste Management Housekeeping Revision -3 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 22 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE 5.4.5 QHSSE Plan Compliance Daleel shall review the compliance of Contractor QHSE Plan and suggest amendments for improvement of the QHSSE MS. 5.4.6 Emergency Preparedness Emergency Preparedness shall be tested by conducting various emergency drills as indicated in contractor QHSE Plan 5.4.7 Monthly Report The Contractor shall provide Daleel with a monthly QHSE performance report for all Work undertaken in connection with this Contract. The monthly cut off for each report shall be the close of business Day up to and including the final Day of each Month. The Contractor’s QHSE performance report shall include Incident Frequency Rate calculated based on the following formula: 5.4.8 Lost Time Frequency (LTIF) = No LTI x 1,000,000 / Man hours Total Recordable Case Frequency (TRCF) No(LTI +MTC+RWC) x 1,000,000 / Man hours Motor Vehicle Incident Frequency (MVIF) No MVI x 1,000,000 / Total KMS driven QC Inspection The contractors shall initiate Request For Inspection (RFI). Daleel QC Engineer shall inspect and ensure that the Acceptance Criteria indicated by the concerned ITP is within the specified limits and then close out RFI 5.4.9 Quality Audits Contractor’s site shall be audited in accordance with ISO 9001:2015 Requirements. 5.5 DEMOBILIZATION/ RESTORATION 1.1.1 Contractor camp site This is applicable only if location for a temporary construction camp has been provided by Daleel. If the location is provided by Daleel, Daleel shall inspect the site and ensure that the site is clear of all Contractor Assets and satisfactory restoration has been attained. 1.1.2 Contractors Industrial Yard Site This is applicable only if location for Industrial yard is within Daleel concession area. The site shall be inspected to ensure that the site is clear of all Contractor Assets and satisfactory restoration has been attained. Revision -3 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 23 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE 5.5.1 Site Inspection and Restoration Daleel shall inspect all Daleel sites inclusive of Office premises and ensure that: All contractors assets are removed from the location All Daleel assets and materials are handed over to Daleel Proper housekeeping is maintained at site 5.6 INCENTIVES AND VIOLATIONS/ PENALTIES BY LEGAL CONSUL 5.6.1 Incentives Daleel will bear 50% of the cost according to the set criteria for the qualified Contractors according to the approved list. The qualified CONTRACTORS shall bear the other 50% of the cost to the same approved list. 5.6.2 LTI Free Years OMR Daleel Share OMR Contractor Share Total Award 1 OMR 20 Each OMR 20 Each OMR 40 Each 2 OMR 40 Each OMR 40 Each OMR 80 Each 3 OMR 60 Each OMR 60 Each OMR 120 Each 4 OMR 80 Each OMR 80 Each OMR 160 Each 5 OMR 100 Each OMR 100 Each OMR 200 Each QHSSE Non-compliance penalties In the event that Daleel identifies that Contractors has failed to comply with the reporting requirements, latest Approved Contract QHSSE Management Plan, or other Contract QHSSE requirements, then Daleel shall issue Contractors with a QHSSE default notice retrospectively. 5.6.3 An QHSSE Default notice Is a written notification issued by Daleel detailing specific aspects of the service that do not comply with either the latest approved Contract QHSSE Management plan or other Contract QHSSE requirements (DP-QHSSE-CP-02.4, QHSSE Default Notice) 5.6.4 Penalties Penalties for QHSSE Non Compliance committed by Contractors will be applied in the event that the Contractor has not remedied the default as per the notice of default Company as follows: Revision -3 QHSSE Default Penalty Single default OMR 300 per day per QHSSE Default notice. Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 24 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE 5.6.5 If, as a result of Daleel–led investigation, it is discovered that there has been a nonconformance related to QHSSE reporting of recordable cases, this will attract a specific penalty as specified in Para 5.6.3. and 5.6.4. Such default will be held against the Contractors and NOT against Contractors employees. 5.6.6 Repeated failure by Contractors to comply with Contract QHSSE requirements may result in the removal from Site of the relevant Contractors’ Supervisory and/or Managerial Personnel. 5.6.7 For each QHSSE default notification the following shall apply: a. Where a QHSSE default notice contains several incidences of default, each incident shall be considered as a separate QHSSE default notice. b. Where the repeated incidences of QHSSE default occur throughout the duration of the Contract then the following remedies are available to Daleel : QHSSE Default Repeated Recurrence Persistent non-conformance 6.0 Penalty Increased supervision by Daleel on Contractors at the cost of Contractors Suspension of Registration for the relevant Service Group of the Contract (in future tender participation) EVIDENCE OF CONFORMITY Form Ref. DP-QHSSE-CP-02.1 DP-QHSSE-CP-02.2 Description Contractor’s Acknowledgement Of QHSSE Obligations Monthly QHSSE Statistics Report DP-QHSSE-CP-02.3 Annual QHSSE Plan DP-QHSSE-CP-02.4 QHSSE Default Notice Revision -3 Date –1st May 2023 Medium Location Minimum Retention Responsibility Disposal Hard/ Soft Site Office 3 Years QHSSE Bin Hard/ Soft Hard/ Soft Hard/ Soft Site Office Site Office Site Office 3 Years QHSSE Bin 3 Years QHSSE Bin 3 Years QHSSE Bin Document # DP-QHSSE-CP-02 Page 25 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE APPENDIX 1: PROJECT QHSSE CERTIFICATE PROJECT QHSSE CERTIFICATE Contract Title Contractor Contract No. Sub-Contractors Contract Plan Activity Date Completed Exceptions Kick Off Meeting Held Pre-Commencement Readiness Meeting QHSSE Plan inclusive of HEMP Approved PQP Approved Method Statements Residential Camp Accepted Industrial Site Accepted Vehicle/Plant Accepted Training Completed Key personnel CV approved and mobilized QHSSE Pre-start-up Audit Essential Audit Items Completed Notes: On behalf of the Contractor ( ) I confirm that the activities stated above have been carried out and we are capable of performing the work in a healthy, safe, and environmentally responsible manner. Name Date Designation Signature QHSSE Manager / Advisor Project Manager Revision -3 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 26 of 27 CONTRACTORS QHSSE MANAGEMENT PROCEDURE DALEEL hereby agree that the QHSSE status of this Contract allows work to proceed, subject to the above exceptions. Name Date Designation Signature QHSSE Sr.M Contract Holder Contract Manager (Daleel) Name & Address The Contractor Representative (person being engaged to perform services) Name & Address Description of Service (to be performed by the contractor) Contract No. Contract Name Revision -3 Date –1st May 2023 Document # DP-QHSSE-CP-02 Page 27 of 27
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )