STANDARD FIELD QUALITY PLAN ITEM: CIVIL WORK SUB:- SYSTEM:---------SL.NO . 1 1 1.1 ACTIVITY AND OPERATION 2 CHARACTERISTICS 3 TO BE USED FOR:PROJECT :- CC weigh bridge road job PACKAGE :- CIVIL WORK CONTRACT NO.:- MAIN CONTRACTOR: FQP NO. CC Weigh bridge, Rev.00 PACKAGE:- Y section road works SO NO.:- DATE:PAGE:- TOMPL, Talabira mines ACCEPTANCE NORMS 8 FORMAT OF RECORD 9 D* As per Contractor's As per Contractor's scheme for scheme for Excavation/approv ed Excavation/appro drg ved drg √ CLASS OF CHECK# 4 TYPE OF CHECK 5 QUANTUM OF CHECK 6 REFERENCE DOCUMENT 7 B Visual Random B Measurement 100% - do - - do - RW RW B - do - 100% - do - - do - RW - do - do - - do - do - RW RW √ √ REMARK 10 EXCAVATION 1.2 1.3 Nature of Soil/ Rock Initial ground level Dimension of Pit 1.4 Final Pit/ Bed Level 1.5 Slide Slope B B - do - do - 100% Random Grain Size Analysis A Physical Note-1 IS 2720-part IV IS 2720-part IV SR/TR 2.2 Liquid and Plastic A - do - Note-1 IS 2720-part V IS 2720-part V SR/TR 2.6 Moisture content of Fill before compaction A - do - Note-1 IS2720-part II IS2720-part II SR/TR 2.7 1) For fill material lab density A).Maxi Dry Density B).Optimum Moisture 2) Field Density: Dry density by core cutter method or Dry density in Place by sand displacement Method Standard Sand 1.00mm passing & 600 micron retain A Physical One per sourse & every change IS:2720 (P-7&8) For reference TR A Physical Note-4 IS:2720 (part-xxvii) IS:2720 (part-xxvii) SR/TR √ B - do - IS 2720 part 8 IS 2720 part 8 SR/TR √ B Review 100% IS 269 2015 IS 269 2015 B) Storage of Cement B Visual 100% IS 4082 IS 4082 SR C) Retesting of Cement for compressive strenth and setting time if stored more than 60 days in contractor A Testing One Sample per Batch IS 4031 IS 4031 TC Note-5 IS2386(partIII) IS 456 & IS 383 IS2386(partIII) IS 456 & IS 383 SR/TR √ IS 2386 (p I) & IS 383 2016 IS 2386 (p I) & IS 383 2016 SR/Lab Report √ IS2386(partIII) IS 456 & IS 383 2016 IS2386(partIII) IS SR/TR & Lab 456 & IS 383 2016 Report √ On per each source √ These test will be carried out while estabilishing design mix and results shall be initiated to site for review and approval 2 2.1 2.8 3.1 3.1.1 CEMENT 3.1.3 3.1.4, a) √ per 3000 m3 MDD & OMC lab test √ report reqd as per MORT&H section 900 TC Min 06 no of sample for every 1000sqm area as per MORT&H section 900 √ Manufacturer's TC for each batch to be reviewed Cement to be stored on raised √ plateform in a weather tight covered √ Coarse Aggregate Fine Aggregate ADMIXTURE WATER 3.1.4, b) √ Note No. 1 Minimum 2 Samples in every 3000 cum of each type and source of fill materials CAST-IN-SITU CONCRETE MATERIALS A)TC as per IS 269 2015 3.1.2 √ FILL MATERIALS & GSB Degree of compaction fill 3.0 √ √ a) Moisture Content B Physical b) Parties Size & Shape (Slieve Analysis, Determinations of material finer than 75 micron, flakeness Index, Elongation A - do - d) Specific gravity, bulk density, voids matter absorption B Physical h) Impact Value B Physical Once per source IS 2386 part 4 IS 383 & every change 2016 of source IS 2386 part 4 IS 383 2016 SR/TR & Lab Report a) Moisture content prior to castng for rainy days B - do - Every day Before Start of work IS 2386 (P III) IS 383 2016 & IS 2386 (VI) SR/TR & Lab Report b) All others tests similar to coarse aggregate like Grading, FM B - do - Once per source & every change of source Brand & Batch No. B Physical 100% B - do - Quarterly for each source B - do - - do - a) Test for acidity and alkalinity by neutralization of water using indicator and check for sulphate and chloride b) Test for ascertaining limit of solid c) Test of PH value d) Organic, Inorganic , Sulphate & chloride content B B - do - do - While establishing design mix and once per 250 cum or / change While establishing design mix and once per 250 cum or / change of source - do - do - IS 2386 (P III) IS 383 2016 & IS 2386 (VI) √ After Mfg. 90 days retesting reqd. before using at site Note - 5 Once for each stock of 250 cum or part there of expect during monsoon when this has to be done everyday before start of concreting These test will be carried out while estabilishing design Mix and results shall be intimated to site for review and approval, per 250 m3 periodical checking reqd. Volume of sand & weight of water shall be adjusted as per moisture content Fresh lab test reqd. if source is changed, Grading & FM periodical checking reqd. for every 250 m3 concrete qty IS - 9103 1999 & Appd. Design Mix IS - 9103 1999 & Appd. Design Mix TR IS 3025 (P-22 & 23) IS 3025 (P-22 & 23) IS 456 IS 456 TR IS 3025 (P-18) IS 456 IS 3025 (II) 456 IS 3025 (II) 456 IS IS IS 3025 (P-18) IS 456 IS 3025 (II) IS 456 IS 3025 (II) IS 456 Admixture brand is as per established & Approved trial mix. 100 ml of water should not require more than 5 ml 0.02 NNaoH (using √ phenolphthatic indicator) and 25 ml of 0.02 N sulphuric acid TR √ TR √ TR √ 3.1.5 Concrete a) Workability (Slump) Test B CONCRETE CONVEYING & PLACING IS 456 2000 & IS 1199 part 2 2018 IS 456 2000 & IS SR/TR /& Lab 1199 part 2 2018 report Min 4 trail Mix with & without admixture for each grade of concrete IS 456 2000, clause 15.2.2, IS 516 part section 1 2021,IS 10262 2019 IS 456 2000, clause 15.2.2, IS 516 part section 1 2021,IS 10262 2019 b) Trial Mix ( Cubes compression strength) Mix Design A Physical c) Compressive strength of cubes A - do - d) Water Cement Ratio B Physical e) Cement Content 4 Physical One sample every batch - do - Sampling as per IS 516 part 1 section IS 516 part 1 section IS 456 2000, SR/TR 1 2021 1 2021 clause 15.2 At Random at SR/ Lab Appd Design Mix Appd Design Mix the time of Report/ TR SR/TR & Lab - do - do - do Report IS 9103 1999, ASTMIS 9103 1999, TR C ASTM- C 100% 494 & apped design 494 & apped design Mix Mix f) Admixture for Concrete B Testing g) Dimension and Visual examination of finished Structure B Visual & Measurement 100% IS 456 2000 clause 11.1 & Drawing IS 456 2000 clause 11.1 & Drawing A - do - 100% IS 4925 2004 IS 4925 2004 A Measurement 100% IS 4925 2004 IS 4925 2004 B Physical 100% a) Mixing of concrete (Calibration of concrete Mixture) b) Calibration of batching plant c) Handing and transportation. SR/TR ­ 5 √ testing as per reqd. frequency √ √ √ √ Calibration cont of Mix √ SR C 94 d) Placement of concrete √ For trial Mix min 6 cubes for each Mix out of which 3 cubes shall be tested at 7 days and remaining 3 cubes shall be tested for 28 days comp. Strength of Mix design test shall be carried out by NABL agency SR - do - As per As per construction erection construction erection methodology, ASTM methodology Slump test for medium and high workability & construction factor test for √ medium and low workability. For RMC as per IS 4926 2003 workability tolerence applicable. - do - 100% - do - e) Temp Control of concrete for top deck of TQ foundation B Physical 100% ­ Temp 35° C Max SR f) Check for placement B - do - 100% ­ As per Apped Construction methodology SR g) Compacting B - do - Random ­ Check for segregation as per IS 456 2000 h) Curing B - do - - do - IS 456 2000 Check period of curing as per concreting SR d) Placement of concrete C Visual 100% ­ Before clearance for concreting SR a) Material approval A TPI b) Mechanical and chemical properties A TC Review Ad mixture brand must be as per established & Approval mix design. Raft, footing & column beam dimesional tolerance Concrete Mixture shall be calibrated at time of starting & sequently once in three months To be calibrated at the time of √ starting & subquently once in 3 months internally & once in year Free fall of drop shall be limited to 150 cm unless permitted. Concrete should be placed with in 30 minuted of its removal from SR B As per printed Report from computerized batching plant for each - do - No concrete shall be placed until the place of deposit has been removed √ Appropriate shall be taken to control the concrete temp If water accumulates at surface due to bleeding or other causes, concreteing shall be stopped as far as possible for reconsideration of Mix design. Accumulated water shall be removed by sponge. SR √ Exposed concrete surface shall be protected against heating & drying for at least 72 hours after placement curing compound may be used. Reinforement c) Cutting tolerance d) Freedom from crack & surface flow Lamination Once per Brand IS 1786 2008 Amnd IS 1786 2008 approval & 3 2018, IS Amnd 3 2018, IS every change of 432 & IS 1599 & IS 432 & IS 1599 & IS 1608 1608 Brand 100% IS 1786 2008 & IS 432 IS 1786 2008 & IS 432 IS 1852 IS 432 IS 1786 Test Report TC Sample will be collected at site / manufacturer and test will be performed at NAPL approved lab by AEL witnessed TC for each batch shall be requried √ Repeated test may be carried out as per requirement of site engineer. B Measurement 100% IS 1852 IS 432 IS 1786 B Visual Random - do - - do - SR Review 100% IS 2502 Drawings SR - do - - do - 100% - do - - do - - do - - do - SR √ IS 456 Bar Bending Schedule Drawings & bar schedule IS 456 Bar Bending Schedule Drawings & bar schedule SR √ IS 1838 part 1 1983 IS 1838 SR/ LB Tolerance as per specification To be checked at site steel material to be stored properly to prevent rusting. Placement of reinforcement steel 6.0' a) Check for bar bending schedule with necessary laps, spaces & chairs, b) Check for cover, spacing of bars c)check for bending of bars d) check for spacer and chair after reinforncemnt cage is put inside the framework e) Lapping of bars I) Check all joint crossing 7 Joint of Concrete Materials Installation & Fixing a) Bitumen impregnated board b) PVC water stop c) Bitumen sealing compound d) Two Part poly sulphide sealant e) Expanded Polystyrene board B B B Review & mesurment Visual & measurement B - do - 100% B Visual 100% B Visual Random A Review TC One / lot A - do - One / lot IS 12200 IS 12200 A - do - One / lot IS 1834 1984 IS 1834 1984 A - do - One / lot IS 12118 1987 IS 12118 1987 A - do - One / lot IS 4671 2018 IS 4671 2018 B Visual Random Specn Specn SR SR SR TC √ √ TC TC √ √ TC √ TC √ SR 50 D as per SOP FQA representative CONTRACTOR - QA/QC Prepaerd By: Sasanka Dey GM, Head QC. JP AUTOCLAVERS & CO. FQA Head
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )