CMT MIDTERMS 311.2.10 STORAGE OF CEMENT AND AGGREGATES Storage buildings shall have the capacity to store a sufficient quantity of cement to allow sampling at least twelve (12) days before the cement is used. 311.2.11 PROPORTIONING, CONSISTENCY, AND STRENGTH OF CONCRETE Design mix is based on the absolute volume method as outlined in ACI Standard 211.1 “Recommended Practice for Selecting Proportions for Normal and Heavyweight Concrete.” At least 364kg of cement per cubic meter of concrete to meet the minimum strength requirements. The goal is to produce workable concrete with: o Slump of: 40-75mm if not vibrated 10-40mm if vibrated o Slump shall be determined using AASHTO T119 The concrete must reach the minimum strength at 14 days of o Not less than 3.8MPa (550psi) using the third-point flexural test (AASHTO T97) o 4.5MPa (650psi) using the mid-point flexural test (AASHTO T177) o Compressive strength of 21.4MPa (3500psi) using cores (AASHTO T24) 311.3 CONSTRUCTION REQUIREMENTS 311.3 1 QUALITY CONTROL OF CONCRETE 1. General Contractor is responsible for quality control during material handling, blending, mixing, and placement 2. Quality Control Plan Contractor must submit a Quality Control Plan to the Engineer outlining: o Procedures for production control o Sampling and testing frequency The Engineer must have free access to: o Production records o Mix design, materials certification and test reports 3. Qualification of Workmen Concrete Batcher: ensures accurate material weights and moisture measurements Concrete Technician: oversees concrete quality, performs tests, adjusts mix design, and acts as batcher when needed 4. Quality Control Testing Contractor performs all necessary sampling, testing, and inspection to ensure compliance Tests include aggregate gradation, slump, air content, water-cement ratio, and temperature Concrete must match the approved mix design 5. Documentation Maintain records of all inspections and tests, including: o Observations, deficiencies, approved/rejected quantities, and corrective actions o Engineer may take random independent samples for verification 311.3.2 EQUIPMENT 1. Batching Plant and Equipment General o Must include bins, hoppers, and scales for each material o Bulk cement needs separate bin, hopper, and scale o Batching plants require a nonresettable batch counter Bins and Hoppers o Separate compartments for each aggregate size Scales o Must be accurate within 0.5% o Beam or springless-dial types only o Must be lockable and inspected regularly Automatic Weighing Device o Required unless otherwise specified 2. Mixers General o Can be used on-site, central plant, or truck mixers o Must have manufacturer plate showing capacity and mixing speed Site Mixers: o Must produce a uniform mix within a specified time o Requires automatic timing device and batch counter o If the timer fails, mixing time defaults to 90 seconds Truck Mixers and Agitators o Must comply with AASHTO M157 Non-agitator Trucks o Must be mortar-tight, smooth, and discharge concrete without segregation 3. Paving and Finishing Equipment o Must place, spread, consolidate, and finish concrete in one pass o Requires: 2 oscillating screeds Vibrators operating at 8300-9600 impulses/min, spaced max 60 cm 4. Concrete Saw Must be adequate in number and power Uses water-cooled diamond blade or abrasive wheel At least one standby saw and ample blades required 5. Forms Made of steel and equal to pavement thickness Bases wide enough for stability; braces extend at least 2/3 form height Supported on compacted material and set securely to resist vibration/impact If any form is disturbed or the grade becomes unstable, the form must be reset and rechecked. 311.3.5 CONDITIONING OF SUBGRADE OR BASE COURSE Ensure side forms are securely set to grade. Bring subgrade or base course to proper cross-section: o Trim high areas to the correct elevation. o Fill and compact low areas to match surrounding grade. 311.3.3 PREPARATION OF GRADE After compacting the subgrade or base to the required density, it must be trimmed to the correct elevation using a properly designed machine. The trimmed and prepared area must extend at least 60 cm beyond each edge of the proposed concrete pavement. If density is lost during trimming, it must be restored through additional compaction before placing concrete. If traffic uses the prepared area, the surface must be checked and corrected right before concrete placement. The subgrade or base must be uniformly moist when the concrete is placed. 311.3.4 SETTING FORMS 1. Base Support The foundation under the forms must be hard and accurately graded to ensure firm contact along the entire form length. If the roadbed is below grade at the form line, it must be filled with approved granular material in layers not exceeding 3 cm and thoroughly compacted. Maintain the finished grade in a smooth and compacted condition until pavement placement. Subgrade or base course must be uniformly moist when placing concrete (unless a waterproof cover is specified). If the subgrade becomes too dry: o Sprinkle it with water. o Avoid creating mud or pools of water during sprinkling. 311.3.6 HANDLING, MEASURING, AND BATCHING MATERIALS Batch Plant Requirements: o Any high spots above grade must be corrected by tamping or cutting as needed. Stockpiling Aggregates: o Build in layers not exceeding 1 meter thick. o Fully complete one layer before starting the next—no coning of material onto lower layers. o Do not mix aggregates from different sources or with different gradings in one stockpile. 2. Form Setting Forms must be set well in advance of concrete placement. Once set to the correct grade, the grade at both the inside and outside edges of the forms must be thoroughly tamped, either mechanically or by hand. Handling Washed or Hydraulic Aggregates: o Forms must not deviate from the true line by more than 1 cm at any point. 3. Grade and Alignment The contractor must check the alignment and grade elevation of the forms immediately before concrete placement and make corrections as needed. Elevation and crown can be checked using an approved vertical template moved along the forms. Site, layout, equipment, and transport provisions must ensure a continuous material supply to the work. Must be stockpiled or binned for at least 12 hours to drain before batching. Transporting Aggregates (when mixing on-site): o Use batch boxes, vehicle bodies, or suitable containers. o Containers must have effective partitions to prevent spillage between compartments. Handling Bulk Cement: o Use approved methods (chute, boot, etc.) from weighing hopper to batch to avoid cement loss. o Cement must be fully present in each batch as specified. o Cement transported in tight compartments carrying the exact amount for each batch. o If allowed, cement may be transported between aggregates (as per Special Provisions), but: o o Must be mixed within 1.5 hours of contact with aggregates. Cement in original packages may be placed on top of aggregates with the correct number of sacks per batch. Mixer must be charged without cement loss. o Tolerance for batching: Cement: ±1% Aggregates: ±2% Water Measurement: For site or plant mixing: 50–90 seconds, unless tests prove shorter time is effective. o Add 4 seconds if timing starts when skip is fully raised. o Mixing ends when the discharge chute opens. o Multiple-drum mixers: transfer time is included in total mixing time. o Fully empty drum before loading next batch. Mixer Operation: o Follow manufacturer’s rated drum speed. o Concrete mixed less than required time must be discarded at Contractor’s expense. o Batch volume must not exceed mixer’s rated capacity, except up to 10% overload is allowed if no spillage and quality is satisfactory. Water Charging: May be measured by volume or weight. o Water must enter before cement and aggregates. o Accuracy: ±1% error. o o If measured by volume: All water must be in the drum within first 15 seconds of mixing. Must have an auxiliary tank equal in volume to the measuring tank. Auxiliary tank must have external tap and valve for accurate checking. Drum Throat Maintenance: o 311.3.7 MIXING CONCRETE o o Mixing Duration: Batch Charging and Accuracy: o Contractor must provide test data confirming mixer performance. Keep clear of material buildup to ensure free flow. Transporting Mixed Concrete: o Use truck mixers, agitators, or nonagitating trucks (per Section 311.3.2). o Time limits from water addition to placement: Mixing Locations: o Concrete may be mixed on-site, in a central-mix plant, or in truck mixers. 45 minutes: non-agitating trucks. o Mixer must be of approved type and capacity. 90 minutes: truck mixers or agitators. Shorter time may be required in hot weather. Mixing Time and Equipment: o o Mixing time starts after all materials (except water) are in the drum. For ready-mixed concrete, follow AASHTO M 157. o Minimum revolutions may be reduced if supported by manufacturer data. Manufacturer’s serial plate must show the recommended revolutions. Volumetric Mixing for Small Projects (<75 cu.m./day): o Weight-to-volume conversion allowed with moisture/bulking adjustments. o Follow ASTM C 685, Sections 6–9. Mixing by Chute: o Allowed if weighing scales are used for batch weight. Retempering Rules: o o Not permitted unless: Using truck mixers, Within 45 minutes of initial mixing, Water-cement ratio is not exceeded, Engineer approval is given. Concrete outside specified slump limits shall not be used. Only permitted with Engineer’s approval. 311.3.8 LIMITATION OF MIXING Lighting Requirement: o No concrete mixing, placing, or finishing without sufficient natural or approved artificial light. During hot weather, steps must be taken to keep concrete temperature ≤ 90°F (32°C). Time Limitations: o Concrete must be placed within 90 minutes of charging materials into the mixer. o Concrete that has set or is not placed in time shall not be used. No remixing of partially hardened concrete or mortar with or without new materials. o If only finishing equipment is used: → Adjoining lane may be paved after 3 days. Concrete Consolidation: o Use vibrators to consolidate along forms and joints. o Avoid vibrator contact with joint assemblies, side forms, or grade. o Vibrator operation at any one location must be ≤ 15 seconds. Joint Areas: o Deposit concrete near (not on) expansion/contraction joints. o Do not dump directly on joint assemblies unless hopper is wellcentered. o If concrete falls on a finished slab, it must be removed immediately. Sampling Frequency: o Concrete Placement: o Place concrete to minimize rehandling. o If discharge equipment may cause segregation, unload into an approved spreading device and mechanically spread to avoid segregation. o Continuous placement required between transverse joints; no intermediate bulkheads allowed. Manual Spreading: o Use shovels only, not rakes. o Workers must not walk on fresh concrete with dirty boots or shoes. One set of 3 concrete beam specimens per 330 m² of pavement (230 mm thick) placed per day. Specimen Size: o Contractor must have materials ready to protect fresh concrete from rain until it hardens sufficiently. 311.3.9 PLACING CONCRETE If mechanical equipment operates on a previously placed lane: → That lane must have reached 14-day concrete strength. Beams must be 150 mm x 150 mm x 525 mm or 900 mm. Supervision and Materials: o Specimens must be made under Engineer’s supervision. o Contractor must supply all materials, concrete, and facilities and ensure protection from damage. Rain Protection: o o 311.3.10 TEST SPECIMENS Retempering Prohibition: o Adjoining Lane Requirements: Temperature Control: o Use of Admixtures: o Testing Standards: o Beams shall be made, cured, and tested according to AASHTO T 23 and T 97. o Cylinders are not acceptable substitutes for strength testing. 311.3.11 STRIKE-OFF OF CONCRETE AND PLACEMENT OF REINFORCEMENT After placing concrete, it should be leveled (struck off) to match the planned elevation. For 2-layer concrete: o Bottom layer must be compacted enough to allow placing steel reinforcement on it without shifting. o o Steel may be placed in advance or inserted during concrete placement. Reinforcement steel must be clean (no dirt, rust, oil, etc.) to bond well with concrete. Joints control concrete movement and cracking. Types include: o Use tie bars to connect lanes. o Tie bars must not be painted or coated. o Joints can be formed, sawed, or with inserts. o Use preformed filler for expansion space. o o o Made by grooving the concrete to control cracks. o Avoid damaging joints during finishing machine operation. o Can be non-vibratory or vibratory. o Must ensure smooth surface and good compaction. o o A strip Formed in plastic concrete Sawed after concrete hardens slightly Sawing must be done before cracks appear. 4. Transverse Construction Joints o Needed when concreting stops for over 30 minutes. o Should be at least 1.5 meters away from any other joint. 5. Load Transfer Devices (Dowel Bars) When equipment breaks down. For narrow or irregular areas. Requires approved screeds and vibrators. o Smooths and consolidates the surface. o Can be hand or mechanical. o Removes excess water or laitance. 6. Straight-edge Testing: o Use a 3-meter straight-edge to check for dips or bumps. o Fix any issues immediately. Groove can be: Allowed only: 5. Floating: Must be aligned, straight, and free of concrete plugs. 3. Transverse Contraction Joints Concrete near joints must be vibrated and compacted. 4. Hand Finishing: 2. Transverse Expansion Joints (perpendicular to road direction) o o 3. Machine Finishing: 311.3.12 JOINTS 1. Longitudinal Joints (parallel to road direction) No water should be added on top unless by fog spray. 2. Joint Finishing: For 1-layer concrete: o Top layer must be added within 30 minutes, or the bottom layer must be replaced. 7. Final Finish: o Apply broom finish (if required) once surface water disappears. 311.3.14 SURFACE TEST After the concrete hardens, test the surface using a 3-meter straight-edge. If there are bumps more than 3 mm but less than or equal to 12 mm, grind them down. If the bump is more than 12 mm, the concrete must be removed and replaced at the contractor's expense. Removed areas must be: o Allow movement but keep slabs aligned. o At least 1.5 meters long o Should be coated to prevent bonding with concrete. o Full width of the lane o Placed parallel to pavement surface and centerline. o Any leftover slab portion less than 1.5 meters must also be removed. 311.3.13 FINAL STRIKE-OFF, CONSOLIDATION, AND FINISHING 311.3.15 CURING Curing must start immediately after finishing, and concrete must not be left uncovered for more than 30 minutes. Lack of curing materials or water can suspend the work. 1. Sequence of Finishing: o Strike-off → Consolidate → Float → Straight-edge test → Final Finish Curing must last for at least 72 hours (3 days), using one of these methods: 1. Cotton or Burlap Mats Soak the mats in water, then cover the pavement completely, including the sides. Keep the mats wet and in place for 72 hours. 2. Waterproof Paper Cover the concrete top and sides. Sheets should overlap by 45 cm and extend beyond edges twice the pavement thickness. • Seal joints after curing and before any traffic, including contractor’s equipment. • Clean joints of all debris and curing compounds; ensure surfaces are dry. • Apply sealant per plan details; stir hot-applied material to prevent overheating. • Avoid sealant spills on concrete; do not cover seal with sand or similar materials. • Install elastomeric gaskets without stretching, using approved lubricant adhesive. Must be weighed down to stay in contact. • Gaskets must be compressed and set 6 mm below pavement surface. Keep in place for 72 hours. • Seals must be continuous across each joint. 3. Straw Curing 311.3.18 PROTECTION OF PAVEMENT Start with burlap or cotton mats for at least 12 hours. • Protect pavement from all traffic until final acceptance. Then cover with 20 cm thick wet straw or hay, and keep it saturated for 72 hours. • Fill test boreholes immediately after use. On the 4th day, rewet the cover and leave it until the required strength is reached. 4. Impervious Membrane (Curing Compound) • Use signs, lights, barriers, and watchmen as needed. • Repair or replace any damaged pavement at the contractor’s expense. 311.3.19 CONCRETE PAVEMENT – SLIP FORM METHOD Spray white pigmented curing compound evenly over the surface. • Grade: Use proper machines to set elevation; compact and correct disturbed base. Can also be applied after removing initial mats. Apply 4 liters for every 14 m² using mechanical sprayers. • Placing Concrete: Use slip-form paver for spreading, vibrating, and finishing in one pass. Do not apply in the rain. If damaged, reapply immediately. Avoid spraying inside joints—cure those areas separately. 5. White Polyethylene Sheet Cover the concrete top and sides with plastic sheets, overlapping at least 45 cm. Weigh down to keep contact with the surface. Keep in place for 72 hours. 311.3.16 REMOVAL OF FORMS • Maintain uniform concrete slump (≤ 40 mm); operate paver continuously. • Stop vibration/tamping if paver stops; do not apply external tractive force. • Finishing: Meet specified surface smoothness and texture standards. • Curing: Apply approved curing methods uniformly to all surfaces. • Joints: Construct as specified in Subsection 311.3.12. • Rain Protection: Have forms and covering materials ready; cover edges/surface during rain. 311.3.22 ACCEPTANCE OF CONCRETE Do not remove forms for at least 24 hours after pouring concrete. Deficiency in Strength of Concrete Specimens (%) Percent (%) of Contract Price Allowed Use crowbars carefully to remove nails and pins—avoid breaking edges. Less than 5 100% 5 to <10 80% If edges get damaged (spalled), repair with fresh mortar (1 part cement : 2 parts sand). 10 to <15 70% Major honeycomb areas are considered defective and must be removed and replaced. 15 to <20 60% 20 to <25 50% Any replaced section must cover the full width of the lane and at least the distance between weakened joints. 25 or more 0% (Rejected unless cores prove adequacy) 311.3.17 SEALING JOINTS • Rejected concrete may be verified with at least 3 cores per area. • Cores acceptable if average ≥ 85% of strength and none < 75%. • If core sampling is not possible, payment is reduced as shown above. 311.3.23 OPENING TO TRAFFIC Pavement opens only after strength tests confirm minimum requirement or after 14 days if untested. Joints must be sealed and pavement cleaned before opening. 311.3.24 TOLERANCE AND PAVEMENT THICKNESS Deficiency in Average Thickness (mm) Percent (%) of Contract Price per Lot 0–5 100% 6 – 10 95% 11 – 15 85% 16 – 20 70% 21 – 25 50% >25 No payment / Must be removed & replaced • Each lot consists of 1000 m (1 lane) or 500 m (2 lanes) of pavement. • Each lot is divided into 5 segments, with 1 core per segment (AASHTO T 24). • Cores thicker than +5 mm above plan are capped; those thinner by >25 mm are excluded. • Segments with >25 mm deficiency must be removed, replaced, or excluded from payment. 311.4 METHOD OF MEASUREMENT Paid by square meters (m²) of accepted concrete pavement. Width is measured edge to edge; length is measured along centerline. Curb and gutter not included. 311.5 BASIS OF PAYMENT Pay Item Number Description Unit of Measurement 311 (1) PCC Pavement (Plain) Square meter 311 (2) PCC Pavement (Reinforced) Square meter • Payment includes all materials, labor, traffic management, and incidentals.
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )