Case Study Of Test Bed Facility Centre
Supporting Structure & Piping Engineering For
Gas Cooling System And Compressor Area
Date: 25-May2020
Version: 1
The material contained in this document represents proprietary and confidential information pertaining to products, technologies and processes belonging
to CREATIVE. All information in this document must be treated in confidence and not discussed with a third party. The names and trademarks used in this
document are sole property of the respective owners and are governed / protected by the relevant trademark and copyright laws. No part of this
document may be copied, distributed or displayed to a third party without prior written consent of CREATIVE.
© 2020 Creative Synergies Group. All Rights Reserved.
CASE STUDY - TEST BED FACILITY CENTRE
Scope of Work:
Design And Detail Engineering For Test Bed Facility Includes
Gas Cooling System & Compressor Area
Skid Steel Structure Design Calculation
Skid Steel Structure Detail Fabrication Drawings
Pipe Routing Design & 3D Modelling
Pipe Stress Analysis And Support Functions
Piping Isometric Preparation
Pipe Support Design & Detailing
Inputs:
P&ID, Pipe Material Specification
Reference Site Plan & GA Drawings
Equipment Drawings
Tools used:
TEKLA, SolidWorks, CEASAR II, AutoCAD & MS Office
Deliverables:
Steel Structure Design Calculation, Fabrication Drawings
Preparation
Pipe Route Design, Pipe Stress Analysis, Piping GA
Drawings, Isometric Drawings, Pipe Support Drawings &
Consolidated BOM
Delivering Engineering Excellence - Worldwide
Overall Layout
Gas Cooling
System
CREATIVE SYNERGIES GROUP
Compressor
area
©2020 Confidential
2
TEST BED FACILITY CENTRE – OVERALL LAYOUT
TEST BED FACILITY CENTRE OVERALL LAYOUT
Delivering Engineering Excellence - Worldwide
CREATIVE SYNERGIES GROUP
©2020 Confidential
3
TEST BED FACILITY CENTRE – STEEL STRUCTURE
Scope Of Work
Design Of the Structural Skid For Gas Cooling Skid For Test Bed Facility Centre
Development Of The Detail Fabrication Drawings
Skid Lifting Design Analysis And Detail Fabrication Drawings
Validation Of Pipe Supporting Steel Structure And Detail Fabrication Drawings
Codes & Standards
The Following Codes & Standards Are Used For The Structure Design:
ASCE-7- Minimum Design Loads for Buildings and Other Structures
AISC – American Institute of Steel Construction
AISC 360-10 Specifications for Structural Steel Buildings
KS D 3866 - Korean Standard H-Beam Hot rolled steel sections for Building structure
Delivering Engineering Excellence - Worldwide
CREATIVE SYNERGIES GROUP
©2020 Confidential
4
TEST BED FACILITY CENTRE – STEEL STRUCTURE
Deliverables
STAAD Analysis, Lifting Analysis Reports
Detail Fabrication Drawings of Steel Structure, Staircase, Hand Railings, Grating Plates & Toe Plates
Detail Fabrication drawings of Lifting Arrangement
Consolidated Bill Of Material
Professional Engineering (PE) Stamping Of All The Steel Structure Deliverable
Challenge
Main Challenge Of the Project is to Optimize The Steel Structure. CREATIVE Carried-Out The Design
Analysis And Optimization And Reduced The Steel Weight To 64 Ton From 82 Ton
Tool / Software
STAAD Pro
STAAD Ram
TEKLA
AutoCAD
Delivering Engineering Excellence - Worldwide
CREATIVE SYNERGIES GROUP
©2020 Confidential
5
TEST BED FACILITY CENTRE – STEEL STRUCTURE
Snapshots And Site Photos
Site Execution Photo
Fabrication Drawings
STAAD Analysis Report
Delivering Engineering Excellence - Worldwide
CREATIVE SYNERGIES GROUP
©2020 Confidential
6
TEST BED FACILITY CENTRE – STEEL STRUCTURE
Snapshots And Site Photos
Site Execution Photo
Lifting Analysis Report
Fabrication Drawings
Delivering Engineering Excellence - Worldwide
CREATIVE SYNERGIES GROUP
©2020 Confidential
7
TEST BED FACILITY CENTRE – STEEL STRUCTURE
Snapshots And Site Photos
Run-Down Tank Supporting Structure Analysis Report
Site Execution Photo
Fabrication Drawings
Delivering Engineering Excellence - Worldwide
CREATIVE SYNERGIES GROUP
©2020 Confidential
8
TEST BED FACILITY CENTRE – STEEL STRUCTURE
Snapshots And Site Photos
Pipe Support Structure Validation Report
Site Execution Photo
Delivering Engineering Excellence - Worldwide
CREATIVE SYNERGIES GROUP
©2020 Confidential
9
TEST BED FACILITY CENTRE – PIPING
Scope Of Work
Layout Design of Test Bed Facility Centre Includes Both Gas Cooling System & Compressor Area
Small Bore (1/2” To 6”) And Large Bore (10” to 36”) Pipe Routing Design For Both Gas Cooling
System And Compressor Area
Pipe Stress Analysis For Critical Lines And Pipe Support Function Finalization
Piping General Arrangement Drawings, Piping Isometrics & Piping Consolidated Bill Of Material
Pipe Support Detail Engineering & Consolidated Bill Of Material
Professional Engineering (PE) Stamping Of All The Piping Deliverable
Codes & Standards
The Following Codes & Standards Are Used For The Structure Design:
ASCE-7- Minimum Design Loads for Buildings and Other Structures
AISC – American Institute of Steel Construction
AISC 360-10 Specifications for Structural Steel Buildings
KS D 3866 - Korean Standard H-Beam Hot rolled steel sections for Building structure
Delivering Engineering Excellence - Worldwide
CREATIVE SYNERGIES GROUP
©2020 Confidential
10
Deliverables:
TEST BED FACILITY CENTRE – PIPING
Pipe Route Design, Pipe Stress Analysis, GA Drawings, Isometric Drawings, Pipe Support Drawings &
BOM
Piping GA of Gas Cooling System & Piping Around Compressor Area.
GENERAL ARRANGEMENT
Delivering Engineering Excellence - Worldwide
ISOMETRICS VIEW
CREATIVE SYNERGIES GROUP
©2020 Confidential
11
DETAIL ENGINEERING OF TEST BED FACILITY CENTRE
Deliverables:
Pipe Route Design, Pipe Stress Analysis, GA Drawings, Isometric Drawings, Pipe Support Drawings &
BOM
Piping GA of Gas Cooling System & Piping Around Compressor Area.
PIPIG ISOMETRICS
Delivering Engineering Excellence - Worldwide
CONSOLIDATED BOM
CREATIVE SYNERGIES GROUP
©2020 Confidential
12
DETAIL ENGINEERING OF TEST BED FACILITY CENTRE
Deliverables:
Pipe Route Design, Pipe Stress Analysis, GA Drawings, Isometric Drawings, Pipe Support Drawings &
BOM
Pipe Support For Gas Cooling System & Piping Around Compressor Area.
PIPE SUPPORT – SHOE TYPE
Delivering Engineering Excellence - Worldwide
PIPE SUPPORT FABRICATION DETAIL
CREATIVE SYNERGIES GROUP
©2020 Confidential
13