GENERAL NOTES
A
C
B
A
D
C
B
01. ALL ELECTRONICS WORKS HEREIN INCLUDED SHALL BE DONE IN ACCORDANCE
WITH THE LATEST REQUIREMENTS OF THE PHILIPPINE BUILDING CODE AND
LOCAL REGULATIONS.
D
02. ALL WORKS SHALL BE EXECUTED IN CLOSE COORDINATION WITH THE WORKS
OF OTHER TRADES COORDINATE WITH THE ARCHITECTURAL AND ELECTRICAL
WORKS.
14.88m
14.88m
3.68m
3.68m
3.52m
CAM 15
1.46m
FF-1
W
2
D
4
3
FF-2
UP
W
1
FF-2
W
2
D
2
UNIT 3
UNIT 4
OPEN
BELOW
10. ALL INSTALLATION SHALL BE UNDER DIRECT SUPERVISION OF A PROFESSIONAL
ELECTRONICS ENGINEER.
G U T T E R
D
4
UNIT 6
FF-3
UNIT 5
CORRIDOR
W
2
D
4
FF-1
D
2
OPEN
BELOW
FF-2
6
6
OPEN
BELOW
D
4
D
4
W
2
4.00m
UNIT 7
C O N C R E T E
4.00m
09. ALL UTILITIES SHALL BE LOCATED IN FIELD PRIOR TO ANY ATTEMPT TO CONSTRUCT ANY
COMPONENT OF THE VARIOUS CCTV CAMERA SYSTEM.
5
FF-1
4.00m
CAM 16
D
4
W
1
W
1
08. THE CONTRACTOR SHALL NOT DRILL ANY HOLES IN THE BEAMS, DECK OR SUBSTRUCTURE,
UNLESS OTHERWISE APPROVED BY THE ENGINEER.
D
4
UNIT 8
FF-1
D
2
FF-1
MATERIALS AND SPECIFICATIONS
C A N O P Y
D
4
D
2
AIR
WELL
FF-1
FF-1
D
2
FF-2
DN
4.00m
4.00m
CAM 13
FF-2
AIR
WELL
07. ALL BOLTS, SCREWS, NUTS AND WASHERS SHALL BE STAINLESS STEEL. ANTI-SEIZE
PASTE COMPOUND SHALL BE USED ON ALL MOUNTING HARDWARE FIELD CONNECTIONS.
ALL CCTV MOUNTING METHODS AND MOUNTING MATERIALS SHALL BE PRE-APPROVED
BY THE ENGINEER.
4.00m
22.81m
4
CAM 14
FF-1
5
ROOF DECK
OPEN
BELOW
FF-3
D
4
FF-1
W
1
06. CCTV ARE LOCATION SENSITIVE, PROPOSED EQUIPMENT LOCATIONS ARE APPROXIMATE
TO ENSURE THE OPTIMUM FIELD OF VIEW, ACTUAL LOCATIONS SHALL BE DETERMINED
IN THE FIELD BY THE CONTRACTOR, PER THE MANUFACTURER REPRESENTATIVES
RECOMMENDATIONS AND THE ENGINEERS APPROVAL.
FF-1
4.22m
4.22m
UNIT 2
FF-1
AIR
WELL
FF-1
FF-3
W
1
AIR
WELL
4
05. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TESTING AND
COMMISSIONING OF THE ENTIRE INSTALLATION.
STORAGE
AIR W
1
WELL
1.04m
2a
FF-1
UNIT 1
FF-2
04. ELECTRICAL LINES FOR CONTROL AND SWITCHES SHOULD NOT BE VISIBLE AND
SHOULD BE EMBEDDED IN CONCRETE WALL.
FF-1
W
5
D
2
3
2
W
5
22.81m
2a
M.E.P. ROOM
W
2
1.04m
2
1a
D
3
03. CONTRACTOR/SUPPLIER SHALL INSTALL ALL EQUIPMENT IN ACCORDANCE WITH
THE MANUFACTURER RECOMMENDATIONS.
1.20m
AIR W
1
WELL
4.00m
1.46m
1.20m
1a
3.52m
1.44m
1.45m
1
1.44m
1
3.68m
4.00m
1.45m
3.68m
16 Units
Color CCTV camera, IR night vision, water resistant, at least
720p,0.1lux @F1.2, 0 lux with IR (night vision)
1 Unit
16 - Channel Digital Video Recorder ( DVR ),
high-performance standalone DVR with " field " mode.
1 Unit
Uninterruptible Power Supply UPS 2000 W
1,990 ft
CCTV Cable and Connectors or equivalent
FF-2
FF-2
D
2
D
3
2.00m
STORAGE
ROOM
2.14
2.00m
7
CAM 12
7
CAM 11
FF-3
FF-1
CAM 15 CAM 14
DN
CAM 13 CAM 12
CAM 11
CAM 16
W
4
POWER SUPPLY
2.00m
5.40m
1.95m
5.45m
5.40m
DVR
2.00m
5.39m
CAM 10
CAM 9
CAM 8
CAM 7
25
26
27
28
29
30
31
32
33
34
1
2
3
4
9
10
11
12
17
18
19
20
5
6
7
8
13
14
15
16
21
22
23
36
24
MONITOR
(16 CHANNEL)
THIRD FLOOR PLAN
SCALE:
ROOF PLAN
1:100 MTS.
SCALE:
1:100 MTS.
CAM 6
CAM 5
CAM 4
CAM 3
CAM 2
CAM 1
RG59 CCTV CABLE
CCTV SYSTEM DIAGRAM
SCALE
PROJECT TITLE
C e r t i f i e d B y :
cross axis
ENGR. RIZZA T. LOQUIAS
PROFESSIONAL ELECTRONICS ENGINEER
ENGINEERING SERVICES & CONSTRUCTION
2nd Floor, Magistrada-Estrado Building Contact Nos. (054) 871-4585; 0918-4592510; 0905-2362749
Highway 1, San Miguel, Iriga City
E-mail Add.: bartlucena@yahoo.com; crossaxis.esc.gmail.com
PRC NO.000709
VALIDITY: 10-28-2025
PTR. 7884894
ISSUED ON: 01-03-25
TIN. 284 547 596
ISSUED AT: IRIGA CITY
APPROVED BY
MICHAEL NGO
PROPOSED THREE STOREY
COMMERCIAL BUILDING
LOCATION: SAN MIGUEL, IRIGA CITY
SHEET CONTENTS
APPROVED
ADDRESS:
SAN MIGUEL, IRIGA CITY
GROUND FLOOR CCTV LAYOUT
SECOND FLOOR CCTV LAYOUT
THIRD FLOOR CCTV LAYOUT
CCTV MOUNTING DETAILS
MATERIALS AND SPECIFICATION
LEGEND
REVISIONS
NTS
CADD BY
SHEET NUMBER
CHECKED BY
ECE
1
DATE
2
ELECTRONICS