SANCTION OF PCE IS TO BE OBTAINED PRIOR TO EXECUTION OF THE WORK 10360 630 shifted 1. 2210 6145 3925 6300 4600 6820 5130 5180 9000 3925 2. 5865 3. 1676 2210 9790 738 DN STREAM H.F.L-27.060 M 200 MM RCC HAUNCH TOE WALL FLOW BED LEVEL :25.860 M 1219 400 BED LEVEL :25.860 M 4500 11. Df DEN(D)CAP'sDRG.No.BR/COM/38/70 CURTAIN WALL 2541 PROPOSED BARREL LENGTH 20000 RETURN WALL 25481 PROPOSED BARREL LENGTH 12000 2541 150 Th. P.C.C BASE COURSE 900 DROP WALL EXTG. WALL TO BE DISMANTLED EXTG. WALL TO BE DISMANTLED 12. RETURN WALL 150 Th. P.C.C BASE COURSE MIN. 300 Th. SAND FILLING 9. 10. Df 1219 1219 300 6. 7. 8. 13. MIN. 300 Th. SAND FILLING 150 Th. PCC WEARING COURSE 14. 150 Th. PCC WEARING COURSE 15. LONGITUDINAL SECTION X-X. 16. LONGITUDINAL SECTION X-X. LONGITUDINAL SECTION X-X. 17. INSPECTION STEPS TO BE PROVIDED AS PER SITE CONDITION B 3040 18. 19. 900 900 20. 3040 10360 1200 759 457 610 610 1615 732 305 457 2400 FLOW 457 914 457 200 MM RCC HAUNCH FLOW 11640 14540 610 DROP WALL 200 MM RCC HAUNCH DN STREAM 29. X 30. 31. 32. 33. 34. 300 20 1113 1219 305 305 1113 1113 152 1219 28. 300 610 5865 3200 610 610 152 400 20 3925 9000 20 610 5180 400 610 FLOW 200 MM RCC HAUNCH 300 759 3200 2400 200 MM RCC HAUNCH FLOW 457 5130 4600 400 20 300 X 610 27. 2210 6820 610 CURTAIN WALL 14540 6300 25. 26. 400 3925 5650 5650 6145 24. EXTG. WALL TO BE DISMANTLED 630 shifted UP STREAM 23. 640 EXTG. WALL TO BE DISMANTLED 21. 22. 1200 1200 640 1450 1450 900 1200 35. 36. 5650 1200 640 1200 1200 1200 40. PROPOSED EXTENSION OF BR. NO. 958 OF SIZE (1X2.40X2.850M) RCC BOX AT KM: 580.220 (580/16-18) F/HWH IN BETWEEN STATIONS GANJAM AND CHATRAPUR STATION AT CHATRPUR YARD OF HOWRAH VISAKHAPATNAM MAIN LINE EXISTING DN LINE BRIDGE NO. -958 (1X0.914M) RCC SLAB WITH CEMENT CONCRETE FOUNDATION. 3040 C.L. OF BR NO.958 AT KM.580.220 580/16-18 (1X2.40X2.85M) RCC BOX B 3040 NOMENCULTURE:- 44. 1. EXISTING WORK SHOWN IN BLACK. 2. PROPOSED WORKS SHOWN IN RED. 3. TEMPORARY WORKS SHOWN IN GREEN. 4. DISMANTLING/HIDDEN WORKS SHOWN IN DOTTED. 5. CENTER LINES SHOWN AS CHAIN LINE 6. HYDROLOGICAL PARAMETER SHOWN IN BLUE 7. SLEWED LINES SHOWN IN CROSS MARK 4200 LEGEND:- 400 738 630 PROP. PF-3 BED LEVEL :25.860 M PROP. PF-4 5650 3350 6.820 M 6.30 M 3401 2700 300 480/16 INSPECTION STEPS TO BE PROVIDED AS PER SITE CONDITION 450 210 mm 1. PROP C-S DN LINE EXTG OR LINE PROP C-S DN LINE 4) BALLAST 350 mm 2. EXTG DN LINE EXTG OR LINE TOTAL 742 mm 3. EXTG UP LINE 4. EXTG COMM LOOP LINE 5. 300 MM Thk. CC FLOORING M-20 OR 300 MM Thk. STONE PITCHING WITH CEMENT GROUTING HALF ELEVATION B-B EGL :108.939 BED/FLOOR LEVEL :25.860 M 400 1250 150 TH. WEARING COAT MCC M25 150 TH. LEVELING COURSE 150 225 200 450 SHEAR KEY (SCALE 1:25) Df 300 300 HALF ELEVATION BED LEVEL :25.860 M 300 300 100 450 100 ThK. P.C.C 75 DRAIN HOLES @ 1000mm C/C 100 MM Thk. P.C.C 1050 400 Df. shall be as per IRC SP-13,Article-20 & CL.No.6.I.IV of IRC substructure code & scouring requirment. 400 300 450 300 75 BR NO- 1x 0.914 M RCC SLAB 1 x 2.40 x 2.850 M 3.18 DEGREE BRIDGE WITH CEMENT CURVE R.C.C BOX 958 CONCRETE (R=550M) CULVERT EXtn. FOUNDATION C/S OF INSPECTION STEPS 75 1 2700 1: BOTTOM SLAB 29.211 M 29.949 M 17.0 T/m² 10155/1 CROSS SECTION OF RCC BOX SCALE- 1:50 150 TH. PCC Base Course SAND FILLING 3350 25.860 M 400 AN TH PE R 400 150 THK WEARING COURSE TOP SLAB 150 RDSO DRG.NO WEEP HOLES OF 75 DIA PVC PIPES @1000C/C 1250 INDUCED PRESSURE AT FOUNDING LEVEL OF RCC BOX ST EE RAIL LEVEL OF BRIDGE EARTH RETAINER 150 THK WEARING COURSE (M20) T FORMATION LEVEL OF BRIDGE HAUNCH 200X200 TYP. BACKFILL MATERIAL NO BED LEVEL OF BRIDGE 400 PE ON STRAIGHT /CURVE 400 O TYPE & SPAN OF PROPOSED BRIDGE. BACKFILL T MATERIAL ST EE PE R TH AN 1: 1 SL TYPE & SPAN OF EXISTING BRIDGE. NO MINIMUM 600 (mm) WELL HAND PACKED BOULDERS BR NO. PE 400 O 2400 2700 SL PACKED BOULDERS MINIMUM 600 (mm) WELL HAND 900 (SCALE 1:25) DETAILS STATEMENT :- SANCTION HEAD:-PH-16 PIN OO ITE NO O - EAST COST RAILWAY SECTION OF DROP WALL & CURTAIN WALL TYPICAL CROSS SECTION OF TOE WALL HALF SECTION. CE'S DRG. NO- 5605/2023 SH-1/2 LOADING STANDARD:TLOADING STANDARD 900 1050 BALLAST RETAINER RISE-150 MM TRADE-300 MM 3'-8" 6'-2" 1200 PLAN 914 300 1000 (DIMENSIONS ARE TENTATIVE) RETURN WALL TO BE DESIGNED SCALE- 1:50 3'-8" 4'-0" SCHEMATIC DETAIL OF RETURN WALL 300 3'-0" 3040 HALF SECTION B-B 2'-10" SCALE- 1:50 2667 750 DN STREAM E. Co. RLY. BOUNDARY 90.0 M FROM UP LINE CROSS SECTION AT B-B 150 COST OF OHE SLEWING, RE-SLEWING & OHE MODIFICATION IF ANY TO BE INCLUDED IN THE MAIN ESTIMATE. THE WORK IS TO BE EXECUTED IN THE PRESENCE OF CONCERNED SSE/SIG & SSE/TELE WITH PRIOR INTIMATION FOR ANY S & T CABLE INFRINGEMENTS. BEFORE START OF WORK ALL S & T CABLE DIVERSION OF CONCERNED LOCATION NEEDS TO BE ENSURED & AFTER THAT EARTH WORK MAY BE STARTED. SUFFICIENT FUND PROVISIONS IS TO BE ENSURED FOR PROPOSED WORK & S & T PART ESTIMATE TO BE INCLUDED IN THE MAIN ESTIMATE. DURING THE EXECUTION OF WORK AT SITE PROPER PRECAUTIONS TO BE TAKEN TO AVOID ANY DAMAGE TO S & T CABLES. 9'-5" 640 100 ThK. P.C.C SPECIAL NOTES:- 1'-9" CENTER LINE OF THE BRIDGE 750 300 Th. SAND FILLING 150 Th. PCC WEARING COURSE 300 3) PSC SLEEPER PROP. OR LINE 150 Th. P.C.C BASE COURSE 300 PROP. C-S OR LINE 2'-6" 640 BED LEVEL :25.860 M 2) RUBBER PAD 2'-10" 450 75 480/18 BACKFILL MATERIAL 3.80M 5.130 M 4.60M 1: 1 35.50M 7.0 M N 400 HAUNCH 200X200 TYP. PE TH A PROP. SALOON SID. LINE PROP. C-S OR LINE 5.180 M ST BED LEVEL :25.860 M 400 WELL COMPACTED SOIL 48. 49. 172 mm 10 mm 9.0 M TH R PE EE ST EE PE R CONSTRUCTION DEPTH:- UP STREAM 1) RAIL 1850 AN 1: T E. Co. RLY. BOUNDARY 89.610 M FROM DN LINE PROP. SALOON SID. LINE NO O SL 450 600 600 600 450 20 clean JOINT. 2400 BACKFILL MATERIAL NO T 600 400 738 FB 2.151 M PE H.F.L-27.060 M 1 1 IN 10 L HAND 600 (min) WEL DERS PACKED BOUL SL O 900 2:1 3400 FORMATION LEVEL 29.211 M. 1450 300 BALLAST RETAINER 2:1 BACK FILL WITH 600 THK FILTER MEDIA CONFIRMING TO CLAUSE 7.5 OF IRS SUBSTRUCTURE CODE WEEP HOLES AS PER NOTE NO-16 FILL 301 2:1 300 45. 46. 47. 2:1 1 E 2: P O SL 900 41. 42. 43. LEGENDS :- RAIL LEVEL 29.949 M. 150 38. 39. 900 INSPECTION STEPS TO BE PROVIDED AS PER SITE CONDITION PLAN PLAN 1450 1450 PLAN 5650 37. 640 PROPOSED RCC BOX BASED ON RDSO DRG. NO. RDSO/ B-10155/R EXPOSURE CONDITION:- SEVERE. CONCRETE GRADE :I)RCC BOX, RETURN WALL :- M - 30 (DESIGN MIX). ii) ALL MCC WORKS :- M - 25 (DESIGN MIX). ALL REINFORCEMENT STEEL SHALL BE HIGH YIELD STRENGTH DEFORMED BARS (HSD/TMT BARS) OF Fe-500D GRADE CONFORMING TO IS-1786-2008 APRON FOR FOUNDATION WITH ERODABLE SOILS AND THE FOUNDING LEVEL OF DROP/CURTAIN WALL SHOULD BE PROVIDED AS PER ARTICLE 20 OF IRC-SP:13-2004 AND CL.NO.6.I.IV OF IR SUBSTRUCTURE AND FOUNDATION CODE. PROPOSED FL,RL,BL,& TACK CENTER HAVE BEEN CHECKED WITH RESPECT TO APPROVED ESP 4943/2022 ALT-1 & BRIDGE COMPLETION DRG. NO. DEN(D) CAP'S DRG. NO-BR/COM/38/70. SUITABILITY OF THE FOUNDATION PRESSURE SHALL BE CHECKED BY E-I-C AS PER SITE CONDITION. BACK FILL MATERIAL SHOULD BE AS PER CLAUSE 7.5 OF IRS BRIDGE SUBSTRUCTURE AND FOUNDATION CODE. ALL RCC SURFACE COMING IN CONTACT WITH SOIL SHOULD BE PAINTED WITH BITUMEN OR COAL TAR OF APPROVED QUALITY 1.464 KG/SQM. BED SLOPE SHALL BE ADJUSTED AS PER SITE CONDITION AS PER SITE CONDITIONS BY COMPETENT AUTHORITY. WEEP HOLE SHALL BE 75 / 100 MM DIA PVC/AC PIPES STAGGERED @1000MM C/C BOTH VERTICALLY AND HORIZONTALLY STAGGERED.VERTICALLY ABOVE LOW WATER LEVEL IN BOTH RETURN WALL AND EARTH RETAINER OF BOX. FOR RCC BOX BRIDGES IT IS TO BE ENSURED BY FIELD OFFICER OF EXECUTING AUTHORITY BEFORE EXECUTION OF WORK THAT,THE PROPOSED RCC BOX,CURTAIN WALL/DROP WALL RESTS ON FIRM/NON- ERODIBLE STRATA. TOLERANCE SHALL BE FOLLOWED AS PER IRS CONCRETE BRIDGE CODE. DEPTH & SIZE OF FOUNDATION, LENGTH OF RETURN WALL & LEVEL OF U/S & D/S SHALL BE DECIDED BASED ON-SITE CONDITION AND AS PER IRS SUBSTRUCTURE CODE. DIMENSIONS SHOWN FOR RETURN WALL, DROP WALL AND CURTAIN WALL ARE TENTATIVE, WHICH MAY CHANGE AFTER FINAL DESIGN AS PER ARTICLE 20 OF SP-13-IRC-2004 AND IRS SUBSTRUCTURE CODE. NECESSARY TOE WALL SHALL BE PROVIDED WITH PROPER PITCHING. NO CONSTRUCTION JOINT SHALL BE NORMALLY ALLOWED IN CONCRETE WORKS WITHOUT SPECIAL PRECAUTIONS AS PER RELEVANT BRIDGE CODE. PROPER SAFETY MEASURES SHALL BE ADOPTED DURING EXECUTION OF WORK TO SAFE GUARD THE EXISTING BRIDGE AND BANK. THE WORK OUTSIDE RAILWAY BOUNDARY MAY BE DEALT WITH EXISTING POLICY GUIDELINES.21 SPEED RESTRICTION SHALL BE PROVIDED AS PER SR DIAGRAM WHEN EVER REQUIRED. PROPER JUNCTION ARRANGEMENT BETWEEN EXISTING AND PROPOSED STRUCTURES IS TO BE PROVIDED. 20MM CLEAN JOINT SHALL BE PROVIDED BETWEEN BOX AND RETURN WALL AND SHALL BE FILLED WITH SUITABLE FILLING MATERIAL LIKE BITUMEN. LAPPING OF BAR SHOULD BE MINIMIZED AND ALL STAGGERED WHEREVER NECESSARY. MINIMUM LENGTH OF LAP SHALL BE AS GIVEN IN IRS CONCRETE BRIDGE CODE. CONCRETE SHOULD BE PROPERLY VIBRATED AT REGULAR INTERVAL WHILE PLACING THE CONCRETE. FOR CONCRETING WORK,CURING PERIOD SHALL BE 14 DAYS(MIN.) GAP BETWEEN PROPOSED & EXISTING BRIDGE SHOULD BE SUITABLY CONNECTED AS PER SITE CONDITION AND FILLED WITH CONCRETE BY GROUTING OR OTHER SUITABLE METHOD AND MAKE JUNCTION WATERTIGHT. PAINTING OF RCC/PSC STRUCTURE TO BE DONE AS PER CL 5.4.7 OF CONCRETE BRIDGE CODE. WORK SHOULD BE DONE AT SITE IN PRESENCE OF CONCERNED SSE. ALL SAFETY NORMS SUCH AS PROVISION OF BARRICADING TO SAFEGUARD THE EXISTING TRACK DURING THE PERIOD OF EXECUTION SHOULD BE ENSURED.(JOINT SAFETY CIRCULAR 01 / 2014 DT.18.03.2014) JPO DATED 27-06-2012 FOR PROTECTING S&T AND ELECTRICAL CABLES MAY STRICTLY BE FOLLOWED DURING EXECUTION OF WORK. THE WORK TO BE EXECUTED IN PRESENCE OF CONCERNED SSE (S&T)AND SSE (ELECTRICAL) AT SITE FOR ANY S&T AND ELECTRICAL INFRINGEMENT. THE EXISTING TRACK SHALL BE PROTECTED PROPERLY AS PER THE RULES DURING EXECUTION OF FOUNDATION .NECESSARY SPEED RESTRICTION MAY BE IMPOSED DURING EXECUTION OF WORK,IF REQUIRED. THE RAIL PILING WITH SHEETS/SHUTTER SHALL BE PROVIDED AS PER DIRECTION OF ENGINEER-IN-CHARGE/SITE CONDITIONS FOR PROTECTION OF EXISTING TRACK,BEFORE EXECUTION OF EARTHWORK AND EXCAVATION FOR FOUNDATION. ANY DISMANTLING OF ANY PART OF EXISTING BRIDGE SHOULD BE DONE IN PRESENCE OF CONCERNED SSE DULY CONSIDERING SAFETY OF EXISTING TRACK . IT IS CERTIFIED IN THE DRAWING THAT THE EXISTING BRIDGE IS CHECKED FOR ADDITIONAL LOAD COMING FROM PROPOSED TRACK .IT IS FOUND THAT THERE IS NO ADDITIONAL LOAD COMING FROM PROPOSED TRACK ON EXISTING BRIDGE .HENCE, THE EXISTNG BRIDGE IS FOUND SAFE AND APPROVED BY DEN/EAST . FLOOR PROTECTION TO BE PROVIDED AS PER ARTICLE -20 OF IRC:SP-13-2004 . BEFORE START OF WORK, S & T CABLE DIVERSION AT THE CONCERNED LOCATIONS NEEDS TO BE ENSURED. NECESSARY SAFETY PRECAUTIONS TO BE TAKEN TO PROTECT THE EXISTING S & T CABLES DURING EXECUTION OF THE WORK. EXECUTION OF WORK IS TO BE DONE WITH PRIOR TO THE CONCERNED SSE(TELE) & SSE(SIGNAL). S & T PART ESTIMATE IS TO BE INCLUDED IN THE MAIN ESTIMATE. IN CASE OF ERODIBLE SOIL FLOORING SHALL BE ENCLOSED BY SUITABLY DESIGNED CURTAIN/DROP WALL. HOWEVER SCHEMATIC CURTAIN & DROP WALL IS GIVEN. IT IS TO BE ENSURED BY E-I-C BEFORE EXECUTION OF WORK THAT SBC OF FOUNDING SOIL SHALL NOT BE LESS THAN MAXIMUM FOUNDATION PRESSURE AND ACCORDINGLY, FOUNDING SOIL SHOULD BE IMPROVED UPTO REQUIRED DEPTH. TOLERANCE LIMITS SHALL BE FOLLOWED AS PER IRS CONCRETE BRIDGE CODE. INSPECTION STEPS ARE TO BE PROVIDED NEXT TO THE RETURN WALL AS PER THE SITE CONDITIONS. DEN(D)CAP'sDRG.No.BR/COM/38/70 6770 2850 5180 2700 9730 1747 2642 3800 200 MM RCC HAUNCH BED LEVEL :25.860 M 400 FORMATION LEVEL 29.211 M. 4. 5. 1000 610 863 610 3100 610 RAIL LEVEL 29.949 M. FILL 301 762 610 BED LEVEL :25.860 M 4500 1676 400 1676 762 762 610 1676 863 VC 1.450 M 2700 H.F.L-27.060 M FLOW 610 1747 TOE WALL 1676 762 200 MM RCC HAUNCH 1000 BED LEVEL :25.860 M 200 MM RCC HAUNCH 2850 300 FB 2.151 M 400 738 FORMATION LEVEL 29.211 M. 3100 UP STREAM 1676 FILL 301 1676 RAIL LEVEL 29.949 M. ALL DIMENSIONS ARE IN MILLIMETER & ALL LEVELS ARE IN METER UNLESS OTHERWISE SPECIFIED. THE DRAWING IS NOT BE SCALED AND ONLY WRITTEN DIMENSIONS SHOULD BE FOLLOWED. DETAIL DESIGN OF THE BRIDGE WILL BE APPROVED BY COMPETENT AUTHORITY AFTER APPROVAL OF GAD BY CHIEF BRIDGE ENGINEER/ECOR/BBS. LOADING STANDARD - 25 T-AXLE LOAD DESIGN CRITERIA:i.) IRS BRIDGE RULES INCORPORATING A & C SLIP NO :- 51( THIRD PRINTING 2014). ii) IRS CONCRETE BRIDGE CODE INCORPORATING A & C SLIP NO :-9(REPRINT SEPT 2014) iii) IRS SUBSTRUCTURE AND FOUNDATION CODE INCORPORATING A & C SLIP NO :- 10 (SECOND REVISION 2013). 225 450 TYP. DETAILS OF SHEAR KEY OF BOX SCALE- 1:50 KHURDA ROAD DIVISION Project: CHATRAPUR YARD BRIDGE EXTENSION NAME OF WORK- GENERAL ARRANGEMENT DRAWING OF PROPOSED EXTENSION OF BR. NO. 958 OF SIZE (1X2.40X2.850M) RCC BOX AT KM: 580.220 (580/16-18) F/HWH IN BETWEEN STATIONS GANJAM AND CHATRAPUR STATION AT CHATRPUR YARD OF HOWRAH VISAKHAPATNAM MAIN LINE OF KHURDA ROAD DIVISION. EXISTING DN LINE BRIDGE NO. -958 (1X0.914M) RCC SLAB WITH CEMENT CONCRETE FOUNDATION. DRM'S DRAWING NO-BR/KUR/15 /2023 SHEET SIZE : A1 DRAWING SCALE :- VARIES
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )