Numaligarh Refinery Limited
NRL Expansion Project
TP-1ZZZA-HS-PLN-0002_A1
SITE HSE PLAN
ATTACHMENT 15 – PRE EMPLOYMENT MEDICAL REPORT
X-ray chest
Other findings & remarks if any
Page 76 of 103
Fit
Temp Unfit
Unfit
TP DOC REF: 082176C-ZZ-PP-0801_A1
Numaligarh Refinery Limited
NRL Expansion Project
TP-1ZZZA-HS-PLN-0002_A1
SITE HSE PLAN
ADDITIONAL TEST FOR BLASTING; CONFINED SPACE WORKERS
Exams according to the work
Eye consultation (examination)
Audiogram
Spirometry
ECG
Urine analysis
EEG
Stress ECG/Echocardiography
Uric acid
Yes/No
Exam
FBC/CBC
Fasting blood sugar
HbA1c
SGOT/SGPT+ Gamma GT
Cholesterol +Triglycerides
Lipid profile
ESR/CRP
Creatinine/urea
(kidney
function)
Other (liver function, etc.)
Yes/No
SPECIFIC TESTS FOR SPECIFIC TASKS
Food handlers:
A copy of the medical record should be given by each Client and
Stool analysis
Contractor personnel arriving onsite to the onsite Doctor
Noise exposed workers:
A copy of the medical record should be given by each Client and
Audiometric test
Contractor personnel arriving onsite to the onsite Doctor
Dust exposure:
A copy of the medical record should be given by each Client and
Spirometry
Contractor personnel arriving onsite to the onsite Doctor
Page 77 of 103
TP DOC REF: 082176C-ZZ-PP-0801_A1