PINNACLE INTERNATIONAL PILING PILING RIG MACHINE CHECKLIST Project No: Rig MC Serial No : NO. PART ITEM INSPECTION METHOD The machine control display is Control in working condition ok 1 display 2 Engine oil level and coolant Manually check the engine oil level and coolant level 3 Fuel and Heat Level The fuel and heat level checking displays are working. Inspection Date from : MON TUE WED THU FRI SAT SUN To INSPECTION PHOTO Control Display Oil and Heat level Display Dip stick Visual level Check boom condition and boom joints. 4 Boom Condition 5 Overall wire condition. rope condition Gearbox, Kelly bar and spare rope 6 Cabin condition 7 Hydraulic Pipe Boom Condition Ropes All levers and control buttons are working. All hydraulic pipe is okay. Hydraulic Pipe Wire rope The swing alarm is working condition. 8 Swing Alarm 9 Swing condition. warning light 10 Track and iron plate 11 Swing motor in good condition. Swing Light is working Swing Alarm Swing warning light Track Swing Motor The track should not have deformation or damage and the ground should be in good condition The swing motor and screw are 12 Mirror Bacon / A back view mirror is available. 13 Warning Light Check the warning rotating or blinking light or working condition. 14 Bucket pin Drilling Kelly bar and Drilling Bucket Pin and lock available 15 Guard Safety guard available over the operator cabin. Chained 16 casing pin Back views mirrors Bucket Pin All casing pins checked and supports chain available to avoid fall of the pin. Inspection Comments Checked by Drill Rig Operator Name & Sign Acknowledge by HSEO or Lifting Supervisor/Engineer. Bacon /Warning Light Cabin Guard