Nokia Networks NOKIA SRAN Modernization SWAP Delivery Detailed process Nokia Presence & SRAN Modernization references in North West Africa North Africa 15 Customers Tunisia Syria Iraq 600 internal dedicated Service employees delivering all types of Network services Algeria Libya Egypt Saudi Arabia Cape Verde Mauritania Mali Niger Senegal Chad Sudan Gambia Côte D’Ivoire Sierra Leone Ghana Local Nokia Presence Benin Guinea Guinea Bissau Togo Competencies relevant to MNO: • Radio 2G/3G/LTE • MW Transport • Core MSS, MGW, PaCo, SDM • OSS • VAS SMSC, MMSC, AAA, NBG, security • IP Backbone, Backhaul, peering Nigeria Ethiopia CAR S.Tomé Principe Kenya Congo Democratic Republic of Congo Gabon Equat. Guinea Rwanda SRAN Modernization Reference Burundi Tanzania Seychelles Malawi Comoros Angola 2 © Nokia Solutions and Networks 2016 Zambia Mauritius, Reunion Zimbabwe Namibia Content • Procédure de SWAP • Critère d’acceptance • Modularité – Facilite d’installation - Site Models (exemples) Procédure générale de Swap Site Survey Installation Planning preparation On Site Process per cluster Fall Back Installation Swap Procédure de Swap (Détailles) J-15 • Nokia OMC/NPO • Réception des Rapports d’Audits et vérification coté NPO • Envoie de la situation des KPIs et alarmes existantes du cluster/sites 2G/3G • Accord avec MNO sur une période de Gel des Opérations, et collecte des stats/DT a l’avance J-7 • Nokia NPO: • Envoie datafile vérifié /corrigé à l’ingénieur OMC J-7 • Nokia Ingénieur OMC: • Création du datafile sans paramètres de voisinage • Export des données et les ré-envoyer à l’ingénieur NPO pour vérification • Nokia NPO: • Datafile est prêt avec paramètres de voisinage en cas des sites non swappés • MNO/Nokia • Réalisation des tests de Ping conjointement de bout en bout. • Communication des adresse IP et la confirmation de la déclaration au niveau MPLS par MNO • Communication des paramètres et déclaration coté Core J-3 • MNO • Confirmation de la disponibilité de transmission. Procédure de Swap (Détailles) J-4 •Sous-traitant: • Respect des normes de stockage/transport/livraison et répartition des équipements par site • Communication de la liste des équipes selon l’affectation des sites • Respect du scenario du swap pour chaque site selon le site Survey correspondant • Eviter toute réclamation du propriétaire du site (livraison, dégagement du matériel swapé du site) • Démarrage de l’installation des équipements • Etiquetage du feeder à réaliser proprement pour éviter le cross secteur/feeder. • Câblage en énergie • Câblage en fibre optique pour la transmission • Mise sous tension des équipements. •Superviseur Nokia: • Supervision de l’installation et escalation en cas de retard ou problème • Troubleshooting en cas du problème non conforme aux normes Nokia • Confirmation du maping de l’équipement sur site • Confirmation du câblage en fibre optique (dans les règles de l’art) • NPO team: • Réalisation des pré-drives test pour chaque site/cluster et établissement du rapport d’évaluation de la qualité du cluster avant Swap • Nokia Site solution Manager: • Suivi des rapports établis par le superviseur et escalation en cas de manques d’équipements , problème ou retard. Procédure de Swap (Détailles) J-1 1. Sous-traitant: • Commissioning off line avec les différents tests nécessaires. 2. Ingénieur OMC • Confirmation de la connexion de la BTS/Node au MC-BSC/RNC avec la bonne configuration. J (avant Cutover) Sous-traitant : • Sur place avec tous les outils nécessaires (matériel d’installation, spare fibre optique, spare jumper…) TI Manager: • Suivi le swap Ingénieur BSC/OMC : • Présent à l’OMC pour vérification du Traffic et intervention en cas de problème/blocage. Procédure de Swap (Détailles) J (Cutover) Sous-traitant: • Vérification par des tests d’appel, si pas de présence de cross logique/Physique (Test sera confirme après par le post DT) • Switch off la BTS existante 2G/3G • Basculement de la nouvelle BTS SRAN (déconnecter les feeders existants du système d’antennes, connecte les nouveaux jumpers entre système et RF modules vers l’antenne. • Switch on la BTS SRAN • Test de transmission avec l’ingénieur OMC • Test d’apelle Ingénieur OMC • Vérification du traffic • Création des paramètres de voisinage • Coordination avec ingénieur NPO pour le trouble-shooting/changement de configuration. NPO team • Drives test pour chaque site/cluster et établie un rapport d’évaluation de la qualité du cluster après le Swap Procédure de Swap (Détailles) J (Cas du FallBack) Nokia doit retourner en arrière dans les cas suivants: • Echec de l’activation de la BTS SRAN • non possibilité d’établir le test d’appel • Taux élévé du drop d’appel • Echec de handover Procédure de Swap (Matrice) Sous-traitant Nokia Supervisor Site solution Manager Ingénieur OMC d-15 d-7 - Création du datafile sans paramètres de voisinage -Export des données et les ré-envoyer à l’ingénieur NPO pour vérification - Communication des paramètres et déclaration coté Core NPO MNO - Réception des Rapports d’Audits et vérification cöté NPO - Envoie de la situation des KPIs et alarmes existantes du cluster/sites 2G/3G Accord avec MNO sur une période de Gel des Opérations, et collecte des stats/DT a l’avance Datafile est prêt avec paramètres de voisinage en cas des sites non swappés - Réalisation des tests de Ping conjointement de bout en bout - Communication des adresse IP et la confirmation de la déclaration au niveau MPLS par MNO d-3 Confirmation de la disponibilité de transmission. d-4 - Livraiison et installation de la BTS SRAN dans les normes d-1 Commissioning off line avec les différents tests nécessaires . Supérivise l’installation et escalate en cas de problème Suivie du feedback du superviseur et escalate en cas de problème Réalisation des prédrives test pour chaque site/cluster et établissement du rapport d’évaluation de la qualité du cluster avant Confirmation de la connection du BTS au BSC avec la bonne configuration. Procédure de Swap (Matrice) Sous-traitant D (avant Cutover) Sur place avec tous les outils necessaires (matérièl d’installation, spare fibre optique, spare jumper…) Cutover - Switch off - complète l’installation de la BTS SRAN et switch on. -Test d’appel et transmission D+1hours Nokia Supervisor Site solution Manager Suivi le swap Ingénieur OMC NPO Présent à l’OMC pour vérification du traffic et intevention en cas de problème/blocage. - Vérfication du traffic - Créeation des paramètres de voisinage - Coordination avec ingénieur NPO pour le troubleshooting/chang ement de configuration. D+2hours Drives test pour chaque site/cluster et établie un rapport d’évaluation de la qualité du cluster après le Swap MNO Procédure de Swap : Les deux option Cold/Hot Cold Swap Process Cold Swap (if applicable) Technical Site Survey / Technical Swap Report Preparation (I&C in parallel to existing BTS) No downtime required for site preparation 1. Installing the new Flexi MR BTS modules (System and RF modules). 2. Powering the new Flexi BTS using: Free DC breaker on the existing DC power supply 3. Off-line commissioning of the new BTS (In case of avaibilty of new transmission the commissioning will be done on-line) Downtime required swap: (15- 45 min) Switch “OFF” existing BTS Swap cable Roll back Switch “ON” new BTS Remove un-used equipment 4. New BTS ready for integration 5. Lock the site 6. Testing existing antennas 7. Performing VSWR measurement to decide whether existing feeders can be reused or replaced 8. Connect the antennas line to the BTS (connect the botom jumpers on BTS side) and unlock the site 9. Switching off the old Base Station 10. Dismantling of old Base Station Roll back to the initial config in case of any issue Procédure de Swap : Les deux option Cold/Hot Hot Swap Process Hot Swap (if applicable) Technical Site Survey / Technical Swap Report Switch “OFF” existing BTS Disconnect existing BTS Uninstall and remove existing BTS Roll back Install and commission new BTS Downtime required swap: (90- 120 min) 1. Lock and Switch off the old Base Station 2. Testing existing antennas 3. Performing VSWR measurement to decide whether existing feeders can be reused or replaced 4. Dismantling of old Base Station 5. Installing the new Flexi MR BTS modules System and RF modules 6. Powering the new Flex BTS and Switching the interfaces required for operating purpose 7. connect the antenna line to the new BTS (Flexi MR BTS) 8. On-line commissioning of the new BTS 9. Site ready for integration 10. Connect the antennas line to the BTS (connect the botom jumpers on BTS side) and unlock the site 11. On site test call Roll back to the initial config in case of any issue Connect and switch “ON” new BTS Content • Procédure de SWAP • Critère d’acceptance • Modularité – Facilite d’installation - Site Models (exemples) Acceptance description Acceptance for NI services: •Site acceptance via check-list for NI services (installation, commissioning & integration) • Provisional Acceptance certificate is to be issued, on site by site basis, after Site Standard Acceptance Tests (Punsh list to be agreed with MNO) Acceptance for NPO services: • Cluster based acceptance for NPO services (Nokia KPI vs Snapshot Before) • Provisional acceptance certificate for a cluster is to be delivered once all cluster tests are successfully passed and approved by customer. Content • Procédure de SWAP • Critère d’acceptance • Modularité – Facilite d’installation - Site Models (exemples) NOKIA Flexi NSN Flexi BTS Module Nokia Flexi BTS est modulaire et peut s’adapter atout type d’espace et environnement. Elle peut être implémenté en un seul bloc ou en plusieurs modules connecte entre eux. Chacun de ses modules se présente comme suit Elle peut être implémente en : • Stack to the floor (indoor or Outdoor) • Feederless solution avec Radio modules au niveau de l’antenne • Au dessus d’un rack existant • Sur le mur • Accroche a cote d’un rack existant Et c’est le même Module qui est délivré dans tout ces cas. RF M RFM SM Property Temperature Low air temperature limit -35 °C (-31 °F) High ambient air temperature limit (temporary) +55 °C (131 °F) Exemples : SRAN Swap : Résultats Site survey : pour déploiement Flexi en Afrique Roof top outdoor Remove old BTS and install Flexi MR (stacked all modules) Lampadaire dans la rue 2G 900/1800-3G LTE Exemples : SRAN Swap : Résultats Site survey : pour déploiement Flexi en Afrique Stacked option in small Shelter Stacked option in Shelter Move equipment little bit to have 50 cm max as width to install System Modules Full configuration 2G 900/18003G-LTE W Available space If Some equipment arrangement is required Exemples : SRAN Swap : Proposition sur dessin industriel : pour déploiement Flexi en Afrique Indoor site: SHELTER For this case 3 rack spaces are used R1 + R2 + R3 as illustrated in the figure bellow In this case we have three scenario: 1- stacked 2-wall mounted 3-on the top the Rack (R1, R2, or R3 Exemples : SRAN Swap : Proposition sur dessin industriel : pour déploiement Flexi en Afrique Indoor site: SHELTER For this case 3 rack spaces are used R1 + R2 + R3 as illustrated in the figure bellow Scenario 1: Stacked If we have enough space in the montioned location Exemples : SRAN Swap : Proposition sur dessin industriel : pour déploiement Flexi en Afrique Indoor site: SHELTER For this case 3 rack spaces are used R1 + R2 + R3 as illustrated in the figure bellow Scenario 2: wall mounted If we have enough space on the wall Exemples : SRAN Swap : Proposition sur dessin industriel : pour déploiement Flexi en Afrique Indoor site: SHELTER For this case 3 rack spaces are used R1 + R2 + R3 as illustrated in the figure bellow Scenario 3: on top of rack In case of not aviability of space the Flexi BTS will be installed on the top of Rack R1 or R2 or R 3 Existing BTS Exemples : SRAN Swap : Proposition sur dessin industriel : pour déploiement Flexi en Afrique OUTDOOR STRUCTURE S Exemples : SRAN Swap : Proposition sur dessin industriel : pour déploiement Flexi en Afrique OUTDOOR STRUCTURE The flexi BTS will be installed in location 1 or 2 S Exemples : SRAN Swap : Proposition sur dessin industriel : pour déploiement Flexi en Afrique OUTDOOR STRUCTURE The flexi BTS will be installed on top of existing BTS S Existing BTS Exemples : SRAN Swap : Site Model Installation Feederless Jumpers Feederless/tower mount FO cable SM FSMF DC cable FPFC Exemples : SRAN Swap : Site Model Stack Installation using existing antenna line Indoor/Outdoor Existing Antenna line System Indoor Combiner Eventualy Existing non Swapped BTS RF M RFM SM Outdoor
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )