Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department Establishment of Project Management Office (PMO) to Manage Projects, Assets, and Facilities in Riyadh Municipality Operating Procedure for AMANA (insert name of AMANA Dept. i.e. Roads and Lighting) Department Document No. AJS-A01-PMO-PR-000001 Rev 00 AJS-A01-PMO-PR-000001 Rev 00 Level - 3 I - Internal 1 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department Document Submittal History: Rev.: Rev Status Date: Entity Prepared by: Department Checked by: Reviewed by: Strategic Planning & Studies Alun Dolton Goodluck Omorume Signature Signature Mirza Ahmed Husameddin Mousa Signature Signature Gurdeep SingBhamra Abdullah Al Juhani Engineering Management Contracts Management Project Controls Daniel Elia Akik 00 For Use 09/10/2023 AJS Excellence Signature Document Management Construction Management Learning & Development Signature Signature Frank Bravo Mathew Nolan Signature Signature Abdelrahman Yahia Hosam Abushaqra Signature Signature Ahmed Ashour Ahmad Salem Approved by: Nicholas Firbank Signature Signature Signature Ruel Morano Sarwar Alam Signature Signature Mohamed Elwaraky Hosam Abushaqra Signature Signature Tayooboor Rahaman Athanasios Antonopoulos Signature Signature Jawdat Jwaied Bander Alghurabi Signature Signature AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 2 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department Table of Contents 1.0 PURPOSE .......................................................................................................................................... 4 2.0 SCOPE ............................................................................................................................................... 4 2.1 2.2 2.3 2.4 2.5 Streamline Processes: ....................................................................................................................... 4 Enhance Collaboration: ...................................................................................................................... 4 Improve Data Management: ............................................................................................................... 4 Enable Real-Time Reporting: ............................................................................................................. 4 Support Decision-Making: .................................................................................................................. 4 3.0 DEFINITIONS ..................................................................................................................................... 4 4.0 REFERENCES ................................................................................................................................... 4 5.0 RESPONSIBILITIES .......................................................................................................................... 5 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 Strategic Planning and Studies Department ...................................................................................... 5 Engineering Management Department .............................................................................................. 6 Contracts Management Department .................................................................................................. 6 Project Controls Department .............................................................................................................. 6 Excellence Department ...................................................................................................................... 7 Document Management Department ................................................................................................. 7 Construction Management Department ............................................................................................. 8 Learning and Development Department ............................................................................................ 8 6.0 DELIVERABLES ................................................................................................................................ 9 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 Stage 01 – Project Registration: ........................................................................................................ 9 Stage 02 – Initial Planning:................................................................................................................. 9 Stage 03 – Tender for Design: ......................................................................................................... 10 Stage 04 – Design: ........................................................................................................................... 11 Stage 05 – Tender for Construction: ................................................................................................ 13 Stage 06 – Construction: .................................................................................................................. 14 Stage 07 – Testing and Commissioning: ......................................................................................... 15 Stage 08 – Handing Over: ................................................................................................................ 15 Learning and Development Deliverables: ........................................................................................ 16 7.0 PROCEDURES, TOOLS AND TEMPLATES .................................................................................. 17 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 Strategic Planning References: ........................................................................................................ 17 Engineering References: .................................................................................................................. 17 Contracts Management References: ............................................................................................... 35 Project Controls References: ........................................................................................................... 35 Excellence References:.................................................................................................................... 36 Document Control References: ........................................................................................................ 36 Construction References: ................................................................................................................. 37 Learning and Development References:.......................................................................................... 39 8.0 ATTACHMENTS .............................................................................................................................. 41 8.1 EXPRO National Manual for Projects Management – Soft copies of all documents referred to in Section 7.0........................................................................................................................................ 41 AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 3 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department 1.0 PURPOSE The purpose of this document is to outline the deployment for various procedures, processes and templates required for the full and efficient functioning of AMANA Departments in line with EXPRO National Manual for Projects Management. This deployment aims to enhance the different departments’ capabilities, streamline processes and optimize resource allocation to support effective project management. 2.0 SCOPE The primary objectives of procedures, process and templates within AMANA are as follows: 2.1 Streamline Processes: Implementing appropriate tools will help streamline and automate various processes within the departments, reducing manual efforts and improving overall efficiency. Should we go to this level ( Recommendation as per best practice, Amana to decide and engage IT company for Automation, Not AJ contractual scope) 2.2 Enhance Collaboration: Deploying collaboration tools and applications will foster better communication and collaboration among team members, enabling seamless sharing of information, documents, and updates. 2.3 Improve Data Management: Robust procedures and templates for data management will ensure accurate, reliable, and secure storage and retrieval of project-related data and information. 2.4 Enable Real-Time Reporting: Deploying reporting tools will allow the departments to generate real-time reports, providing accurate insights into projects progress, resource allocation, and key performance indicators. 2.5 Support Decision-Making: Implementing analytical procedures and templates will enable data-driven decision-making, facilitating informed choices and enhancing the departments’ ability to identify trends, risks, and opportunities. 3.0 DEFINITIONS Refer to “Mashroat Definitions and Acronyms Guideline – Document No. ENT-E00-GL-000001 Rev 001” which is a comprehensive 121 page document. 4.0 REFERENCES Refer to the below listed volumes from EXPRO National Manual for Project Management: • • Volume 1 - Introduction Volume 2 - Project Registration AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 4 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department • • • • • • • • • • • • • Volume 3 - Project Initial Planning Volume 4 - Contracts and Tendering Volume 5 - Procurement Volume 7 - Project Controls and Reporting Volume 8 - Information Communication Technology (ICT) Volume 9 - Construction Management Volume 10 - Testing & Commissioning Volume 11 - Health, Safety, Security and Environment (HSSE) Volume 12 - Quality Volume 13 - Risk Management Volume 14 - Document Management System Volume 15 - Sustainability Volume 16 - Handover and Closeout 5.0 RESPONSIBILITIES The responsibilities for each Department are listed below: 5.1 • • • • • • • • • • • Strategic Planning and Studies Department Implement EXPRO’s Five-Year Projects Portfolio Planning and Methodology Prepare the Five-Year Projects Portfolio Plan and update it annually. Submit the Five-Year Projects Portfolio Plan for review and approval (reviewing and approving bodies shall be as per the EXPRO 5-Year Projects Portfolio Planning guidelines) Prepare annual capital Works plan and submit it to the Ministry of Finance for budget approval. Submit project registration documents to EXPRO and receive the project number. Lead the Registration and Initial Planning Stages of the Stage Gate process. Manage all strategic and project specific planning and studies (e.g., socio-economic, environmental, and technical), either in-house or via external second parties Interface and coordinate with Ministry of Municipal & Rural Affairs (MOMRA) and its Entities and provide technical input to the National Spatial Strategy (NSS) process – If the NSS is implemented. Interface and coordinate the preparation of the National Integrated Infrastructure Master Plan (NIIMP), If an NIIMP is implemented. Prepare the Strategic Planning and Studies Department knowledge transfer program which includes comprehensive on-the-job training. Proactively support knowledge transfer, continuous learning, and development of AMANA learning partners in the Strategic Planning and Studies Department. AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 5 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department 5.2 Engineering Management Department • Implement, and manage the Architect & Engineering Consultant (A/E) to implement an engineering deliverables management system based on earned value methodology. Monitor and control the Architect & Engineering Consultant (A/E) performance to carry out engineering design work, and deliverables according to applicable standards and design codes. • • • • • • • • • • • • 5.3 • • • • • • • • • • • 5.4 • • Implement, and manage the A/E to implement a system to track forecast design quantities from projects and calculate performance against a quantities baseline. Monitor and control the Architect & Engineering Consultant (A/E) achievements against design milestones (phase schedule) and track estimated cost against budget constraints, in coordination with the cost control department. Provide guidance and support in the identification of design tools to be used for the design of AMANA projects. Provide engineering support during the initial planning phase of the projects including interface with third-party stakeholders, developing scope for site survey/investigation, interface-specific studies, etc. Support in the preparation and evaluation of construction RFPs and proposals. Review & approve proposed design changes to awarded construction contracts & provide support for site construction activities. Provide input to review of technical queries, change orders, and conduct value engineering. Identify the technical standards that need to be developed by A/E. Provide Engineering Management Training. Proactively support knowledge transfer, continuous learning, and development. Develop and implement engineering closeout requirements. Support the construction team in the engineering closeout stage. Prepare the Engineering Department knowledge transfer program which includes continuous learning, lessons learned and comprehensive on-the-job training. Contracts Management Department Develop standards, tools, templates and other requirements for the Department. Develop a plan for the assessment/support of the existing projects, consultants and contractors. Prepare Quality, Continuous Improvement (CI) and Risks requirements in RFPs. Review and approve Contractors/Consultants relevant submittals. Implement EXPRO standard Contract processes and procedures. Undertake all Contract related activities. Ensure CI related activities are incorporated in future contracts. Ensure all Risk / Quality management activities are captured in the contract documents. Support in the preparation and evaluation of construction RFPs and proposals. Identify the technical standards that need to be developed. Prepare the Contracts Management Department knowledge transfer program which includes continuous learning, lessons learned and comprehensive on-the-job training. Project Controls Department Develop standards, tools, templates and other requirements for the Department. Develop a plan for the assessment/support of the existing projects. AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 6 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department • • • • • • • • • • • • • • 5.5 • • • • • • • • • • • • 5.6 • • • • • • • • • • • Prepare Cost Control requirement in RFPs. Review and approve Contractors/Consultants relevant submittals. Implement EXPRO standard Cost Control processes and procedures. Undertake all Cost Control related activities. Undertake all scheduling related activities. Maintain the Contractor Master Schedule. Responsible for the data collection, compilation and analysis. Monitor and evaluate overall progress on achievement of results. Monitor the sustainability of the project's results Prepare monitoring reports using data collection tools. Support in the preparation and evaluation of construction RFPs and proposals. Identify the technical standards that need to be developed. Identify the tools to be used for Cost Control Management of AMANA projects. Prepare the Project Controls Department knowledge transfer program which includes continuous learning, lessons learned and comprehensive on-the-job training. Excellence Department Develop standards, tools, templates and other requirements. Develop a plan for the assessment/support of the existing projects. Prepare Quality, Continuous Improvement and Risk Management requirements. Review and approve Contractors/Consultants relevant submittals. Implement EXPRO standard Excellence processes and procedures. Undertake all Excellence related activities. Undertake all Continuous Improvement (CI) related activities. Support in the undertaking of Risk management activities. Undertaking all Quality management activities. Support in the preparation and evaluation of construction RFPs and proposals. Identify the technical standards that need to be developed. Prepare the Excellence Department knowledge transfer program which includes continuous learning, lessons learned and comprehensive on-the-job training. Document Management Department Implement the document control procedures. Update procedures regularly to align with current work processes. Ensure document restrictions are set based on the appropriate level of security assigned to them. Assign the correct attributes to documents in the ECMS e.g. document status, type etc. Develop and implement distribution matrices so that information is issued to the required stakeholders in a timely manner. Establishment of an information management system for all Program documents and records. Provision of in-house reprographics services. Supported by external vendors as required to meet high volume reproduction and reprographic requirements. Retaining hard copies, where required, in secure and dedicated areas provided for filing. Coordinating training sessions for ECMS users. Provide reports detailing Key Performance Indicators for the Document Management Department. Prepare the Document Management Department knowledge transfer program which includes continuous learning, lessons learned and comprehensive on-the-job training. AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 7 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department 5.7 • • • • • • • • • • • • • • • • • 5.8 • • • • • • • • • Construction Management Department Develop technical standards: construction procedures, standard specifications, projects execution plans. Develop a plan for the assessment/support of the existing projects. Prepare Construction Management requirements in RFPs. Review scope of work for construction services of all RFPs prior to issue. Manage the construction services contracts interdisciplinary construction activities, sustainability, and constructability reviews. Review and approve shop drawings/ submittals – for critical projects. Implement, and manage a system to track and forecast construction quantities for projects and calculate performance against a quantity baseline. Provide input to reviewing technical queries, change orders and conduct value engineering for any changes during construction. Support in the preparation and evaluation of construction RFPs. Review and approve proposed change orders and provide support for site construction activities. Provide construction support during the initial planning phase of the projects including interface with third-party stakeholders, site activities management, etc. Identify the technical standards that need to be developed by the construction team. Provide Construction Management training. Identify the construction procedures required for the construction of AMANA Projects. Cascade the General Commission on survey requirements in order to implement the National Geographical Information System (GIS). Develop and implement construction closeout requirements. Prepare the Construction Management Department knowledge transfer program which includes continuous learning, lessons learned and comprehensive on-the-job training. Learning and Development Department Ensure each department develops an on-going staff assessment process, implement extensive onthe-job training programs and assign appropriate roles and responsibilities. Undertake extensive training of Saudi staff on EXPRO deliverables in Project Management and Leadership courses. Facilitate Project Management trainings in the following areas: General Project Management, Project Controls, Estimating, Cost Control, Planning, Scheduling, Engineering, Construction, Contract Administration, Document Management, Risk Management, Stage Gate Process, 5YPPP, Quality / Safety Management and Continuous Improvement. Facilitate Leadership Courses / Workshops in: Performance Based Leadership, Forthright Conversations, Supervisor Development, Running Effective Meetings, Building Highly Effective Teams and Building Coaching Skills. Facilitate Professional Development Courses / Workshops in: Cultural Diversity in the Workplace, Communication Skills, Facilitating Learning Workshop, Building Strong Relationships, Basic Facilitation Techniques and Influencing Skills. Facilitate Leading Change Courses / Workshops in: Championing and Enabling Change, Leading Change Workshop, Navigating Your Team and Dynamics of Change. Ensure full integration of AMANA’s resources in the day-to-day operation of the various departments with long term sustainable individual career path. Ensure engagement of New Graduate Engineers and Junior Professional Engineers in various departments. Enroll Saudi engineers in the Saudi Engineer Working Program. AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 8 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department 6.0 DELIVERABLES Below is the summary of deliverables required per Department with reference to EXPRO National Manual for Projects Management Stage Gate Process: 6.1 Pre-Stage Gate: 6.1.1 Strategic Planning and Studies Department Deliverables: • 6.2 5 – Year Projects Portfolio Plan. Stage 01 – Project Registration: 6.2.1 Strategic Planning and Studies Department Deliverables: • • Initial Business Case – Strategic Outline Case. Mashroat New Project Registration Form. 6.2.2 Project Controls Department Deliverables: • • • • Class 5 Cost Estimate. Level 1 Schedule. Initial Risk Assessment. Risk Potential Assessment. 6.2.3 Document Management Department Deliverables: • • Live Enterprise Content Management System (ECMS). Project Standard Document Numbering Procedure. 6.2.4 Construction Management Department Deliverables: • 6.3 Scope of work outline. Stage 02 – Initial Planning: 6.3.1 Strategic Planning and Studies Department Deliverables: • • • • • Concept Master Plan and Development Framework. Outline Business Case (OBC). Ministry of Finance (MoF) Approval to Tender for Design. Conceptual Design. Land Acquisition Strategy. AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 9 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department 6.3.2 Engineering Management Department Deliverables: • • • Environmental Impact Assessment. Geotechnical Investigation Report. Survey report 6.3.3 Project Controls Department Deliverables: • • • • • Updated Level 1 Project Schedule. Updated Risk Assessment. Project Cost Estimate (Class 4) - Order of Magnitude. Development of Forms, Templates and Checklists. Development of Risk Management Processes. 6.3.4 Excellence Department Deliverables: • • Development of Continuous Improvement Processes. Development of Records Retention Processes. 6.3.5 Document Management Department Deliverables: • • Project Document Internal Review Protocol Implemented. Document Management Plan. 6.3.6 Construction Management Department Deliverables: • • • • • External Stakeholder Engagement Plan. Project Delivery Strategy. Operational Service Quality Requirements. Commissioning Plan. Development of Key Performance Indicators. 6.4 Stage 03 – Tender for Design: 6.4.1 Strategic Planning and Studies Department Deliverables: • Approval of Project Alignment with the Portfolio. 6.4.2 Engineering Management Department Deliverables: • • • • • • Design Firm Pre-Qualification Review FRP for Design work including Scope of Work, design quality and budget control procedure, Project Quality Plan (PQP) Design Execution Plan and milestones, and deliverables. List of Design Deliverables. Review and Assessment of AE Proposals AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 10 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department 6.4.3 Contract Management Department Deliverables: • • • Tender Document. Bid Evaluation Plan. Contract Award Recommendation. 6.4.4 Project Controls Department Deliverables: • • • Updated Class 4 Cost Estimate. Updated Level 1 and Level 2 Schedule. Updated Risk Assessment. 6.4.5 Excellence Department Deliverables: • • • • Final Forms, Templates and Checklists. Final Continuous Improvement Processes. Update Key Performance Indicators. Final Records Retention Processes. 6.4.6 Document Management Department Deliverables: • • Document and Data Submittal Requirements. Project Document Submission, Review and Approval Protocol Implemented. 6.4.7 Construction Management Department Deliverables: • 6.5 Updated Project Delivery Strategy. Stage 04 – Design: 6.5.1 Strategic Planning and Studies Department Deliverables: • • Updated Outline Business Case (OBC). MoF Approval to tender for Construction. 6.5.2 Engineering Management Department Deliverables: • • Evaluate A/E design report Monitor and control the Architect & Engineering Consultant (A/E) performance to carry out engineering design work, and deliverables according to applicable standards and design codes. AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 11 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department • • • • • • • • • • • • • Templates (Detailed drawings Issued for construction, Document, Total Quality, etc.). Revise 30% - 60% - 90% Design drawing. Detailed Specifications Constructability Review Value Engineering Review. Independent Studies and further design drawing for metal work, piping, industrial, unexpected clashes between services . Ensure design work considers other stakeholders’ requirements. Design Review Reports. Design Contractor Document Deliverables Schedule. Issued for Construction (IFC) Design. Quality control method and procedures. Monitor safety precautions Ensure A/E obtain final permits from all statutory agencies (NOC). 6.5.3 Contract Management Department Deliverables: • Design Contract. 6.5.4 Project Controls Department Deliverables: • • • Class 2 & 3 Cost Estimate. Level 3 Schedule. Updated Risk Assessment. 6.5.5 Excellence Department Deliverables: • • Updated Key Performance Indicators. Draft Lessons Learned Register. 6.5.6 Document Management Department Deliverables: • • • Preliminary Records Retention and Turnover Plan. Document and Data Submittal Requirements. Update Document Management Plan. 6.5.7 Construction Management Department Deliverables: • • Constructability Review. Scope of Work for Construction Tender. AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 12 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department • • • • • Land Acquisition & Stakeholder Approvals. Construction Execution Plan. Testing & Commissioning Plan and methodology. Updated External Stakeholder Engagement Plan. Updated Permitting Plan. 6.6 Stage 05 – Tender for Construction: 6.6.1 Strategic Planning and Studies Department Deliverables: • • Full Business Case (FBC). Full Funding Approved by MoF. 6.6.2 Contract Management Department Deliverables: • • • • • • Contractor Pre-Qualifications. Tender Package. Bid Evaluation Plan. Tender Queries, Responses and Evaluation. Tender Evaluation & Contract Negotiation Record. Contract Award Recommendation. 6.6.3 Project Controls Department Deliverables: • • • Updated Class 1 Cost Estimate. Updated Level 3 Schedule. Updated Risk Assessment. 6.6.1 Excellence Department Deliverables: • • Updated Key Performance Indicators. Updated Lessons Learnt Register. 6.6.2 Construction Management Department Deliverables: • • • • • • Final Construction Scope of Work. Construction Contractor Document Deliverables Schedule. Updated Construction Execution Plan. Construction Management Plan. Pre-bid Site Meeting Records. Site Access Granted Records. AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 13 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department 6.7 Stage 06 – Construction: 6.7.1 Engineering Management Department Deliverables: • • • • • • • Project Assessment report Sub AE technical proposals Shop drawings Attend Factory Acceptance test (FAT) Design/Field change notice Report Construction contractors’ submittals issue NCR • • As-Built Drawings. Vendor Drawings. Snag lists Follow up material, shop drawings, assess and approve material submittals Participate change management • • • 6.7.2 Contract Management Department Deliverables: • • Update Construction Contract Records. Variations, Change Orders – if any. 6.7.3 Project Controls Department Deliverables: • • • • • Update Actual Cost. Updated Project Schedule. Updated Risk Assessment. Progress Reports. Change Order Report. 6.7.4 Excellence Department Deliverables: • • • Review of submitted Forms, Templates and Checklists. Updated Lessons Learnt Register. Updated Key Performance Indicators. 6.7.5 Document Management Department Deliverables: • Updated Records Retention and Turnover Plan. 6.7.6 Construction Management Department Deliverables: • • Construction Turn-Over Packages. Updated Testing & commissioning Plan and Methodology. AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 14 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department • • • • • • 6.8 Updated External Stakeholder Engagement Plan. Updated Permitting Plan. Quality Non-Conformance Reports (NCRs). Equipment Factory Acceptance Test Certificates. Red Lining for As-Built and Vendor Drawings. Internal Stakeholder Engagement Plan for Commissioning and Handover. Stage 07 – Testing and Commissioning: 6.8.1 Project Controls Department Deliverables: • • Updated Risk Assessment. Quality Assessment Reports. 6.8.2 Document Management Department Deliverables: • Updated Records Retention and Turnover Plan. 6.8.3 Construction Management Department Deliverables: • • • • • • • 6.9 Updated Commissioning Plan. Updated Handover Plan. Updated Stakeholder Engagement Plan. Updated Permitting Plan. Asset Register (AR) Template. Testing & Commissioning Turn-Over Packages. Preliminary Handover Certificate(s). Stage 08 – Handing Over: 6.9.1 Strategic Planning and Studies Department Deliverables: • Update the 5-Year Projects Portfolio Plan. 6.9.2 Engineering Management Department Deliverables: • • • • • Engineering Closeout. Handing over documents Assist in training Review Operation and Maintenance Manuals Attest completion of project for occupancy AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 15 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department 6.9.3 Contract Management Department Deliverables: • • • • • Resolution of Commercial Items records and documents. Site Closeout Records. Contractor(s) Clearance Certificate(s). Final Payment Certificates. Project Closure Notice. 6.9.4 Project Controls Department Deliverables: • • • Updated Risk Assessment. Final Project Schedule. Historical Cost Report. 6.9.5 Excellence Department Deliverables: • • Final Lessons Learnt Register. Final Key Performance Indicators. 6.9.6 Document Management Department Deliverables: • • Final Records Retention and Turnover Plan. Document Handover Package to Owner. 6.9.7 Construction Management Department Deliverables: • • • • • • • • • Document Handover Packages to Owner. Punch List Items Clearance Report. Final Inspection Report. Final Safety Incident Records. Deficiency Completion Report. Deferred and Seasonal Testing Completion Report. Defects List Closed. Beneficial Occupancy Turnover Certificate. Final Handover Certificate. 6.10 Learning and Development Deliverables: • • • • Prepare Training Materials. Arrange and deliver trainings based on the Training Plan and Program. Maintain Training Records. Assessment of staff documentation and records. AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 16 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department 7.0 PROCEDURES, TOOLS AND TEMPLATES Refer to the below listed references for each department: 7.1 Strategic Planning References: Document Name Entity 5-Year Projects Portfolio Planning Guide Entity Draft 5 Year Projects Portfolio Plan – Checklist Entity Final 5 Year Projects Portfolio Plan – Checklist Entity Initial Project Scope Outline Form Entity Initial Project Cost Estimate (Class 5) Procedure Entity Estimate Plan Guideline Template Entity Estimate Classification Matrix Entity Representative List of Project Definition Deliverables Guideline Entity Initial Project Schedule Procedure Entity Strategic Assessment Procedure Entity Strategic Assessment Template Entity Strategic Assessment Evidence Matrices Template Entity Risk Potential Assessment Procedure Entity Risk Potential Assessment Template Entity Strategic Outline Case Procedure Entity Strategic Assessment Entity Evidence Matrices Template Entity Strategic Outline Case Template Entity Public Project Prioritization Procedure Entity Portfolio Prioritization Spreadsheet Template Entity Cross-Sector Integration Procedure Entity Evidence Table - Data and Policy Assumptions Template Entity Inter-Dependency Matrix Template Entity Cross-Sector Integration Checklist Template Document number ENT-S00-MN-000001 ENT-S00-TP-000013 ENT-S00-TP-000014 ENT-S00-TP-000007 ENT-S00-PR-000006 ENT-S00-TP-000015 ENT-S00-RG-000001 ENT-S00-RG-000002 ENT-S00-PR-000009 ENT-S00-PR-000004 ENT-S00-TP-000011 ENT-S00-TP-000010 ENT-S00-PR-000005 ENT-S00-TP-000012 ENT-S00-PR-000001 ENT-S00-TP-000001 ENT-S00-TP-000002 ENT-S00-PR-000003 ENT-S00-TP-000006 ENT-S00-PR-000002 ENT-S00-TP-000003 ENT-S00-TP-000004 ENT-S00-TP-000005 7.2 Engineering References: 7.2.1 General Guidelines for Engineering The procedures, processes, guidelines and templates listed below are General Engineering Guidelines as recommended by EXPRO National Manual for Projects Management. AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 17 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department Document Name Engineering Introduction Definitions and references Development and Implementation of Design Standard Procedure Design Review Procedure Technical Standardization Engineering Close out Procedure Development of Service Requisition Procedure Calculation Procedure Design Change Notice Procedure General Engineering Procedure Design Change Notice Template Check List Engineering Close out Check list for Engineering Scope Calculation Cover Sheet Computer Program Information Sheet Calculation Sheet Service Requisition Cover Sheet Scope of Work and Technical Specification Automation Survey Template Controlled Computer Program Control Form Template Controlled Computer Program Record of Revisions Template Controlled Computer Program Error Identification Form Template Controlled Computer Program Error Notification Form Template Units of Measurements Codes Standards References Entity Automation & Information Management Guideline Project Submission Standards and Requirements Project Automation Requirements & Deliverables Guideline Drawing Template Guide Standard Graphic Blocks and Symbols Guidelines CAD Standards Procedure 3D Model Review Procedure BIM Level of Development Matrices BIM Questionnaire/Checklist Project Building Information Modeling Execution Plan (BEP) Template General Design Guideline Improvement of Energy Water Consumption in Buildings Verification and Validation of Computer Programs List of Commonly Used Design and Engineering Software Document and Data Submittal Requirements – Template Technical Specifications Third-Party Design Approvals Tagging Procedure Document number EPM-KE0-GL-000010 EPM-KE0-GL-000011 EPM-KE0-PR-000001 EPM-KE0-PR-000002 EPM-EN0-PL-000001 EPM-KE0-PR-000004 EPM-KE0-PR-000006 EPM-KE0-PR-000003 EPM-KE0-PR-000009 EPM-KE0-GL-000012 EPM-KE0-TP-000020 EPM-KE0-TP-000021 EPM-KE0-TP-000022 EPM-KE0-TP-000027 EPM-KE0-TP-000028 EPM-KE0-TP-000029 EPM-KE0-TP-000030 EPM-KE0-TP-000031 EPM-KE0-TP-000032 EPM-KE0-TP-000033 EPM-KE0-TP-000034 EPM-KE0-TP-000035 EPM-KE0-TP-000036 EPM-KE0-GL-000013 EPM-KE0-GL-000014 EPM-KE0-GL-000019 EPM-KE0-GL-000015 EPM-KE0-GL-000020 EPM-KE0-GL-000018 EPM-KED-GL-000001 EPM-KE0-PR-000008 EPM-KE0-PR-000010 EPM-KE0-RG-000014 EPM-KE0-TP-000024 EPM-KE0-TP-000025 EPM-KE0-GL-000016 EPM-KE0-GL-000004 EPM-KE0-PR-000011 EPM-KE0-RG-000009 EPM-KE0-TP-000008 EPM-KE0-TP-000009 EPM-KE0-TP-000010 EPM-KE0-TP-000012 AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 18 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department Document Name Document number Basic Engineering Design Data Check List - Drawing Check List- Calculation Electro-mechanical Integration EPM-KE0-TP-000013 EPM-KE0-TP-000002 EPM-KE0-TP-000003 ELV System Integration Guideline Fire and Life Safety System Integration Guideline Building Management System and Mechanical System Integration Guideline ELV System Integration- Checklist Fire and Life Safety System Integration - Checklist BMS & Mechanical System Integration - Checklist EPM-KE0-GL-000007 EPM-KE0-GL-000008 EPM-KE0-GL-000009 EPM-KE0-TP-000015 EPM-KE0-TP-000016 EPM-KE0-TP-000017 7.2.2 Facilities Department – Design The procedures, processes, guidelines, and templates listed below apply to Facilities Design in line with EXPRO National Manual for Projects Management. Architectural Design Aids Document Name Encroachment Permits Procedure Saudi Arabia Archeology Regulations Procedure Door and Window schedule Universal Accessibility Landscape Architecture Design Program of Rooms / Spaces for Building Design Report Finishing Material Schedule Data Sheet Escalator Data Sheet Elevator List of Architectural Deliverables Architectural Drawings Checklist Architectural Design Criteria Final Report of Program of Rooms/Spaces for Building Design Door Schedule Template Material Finish Schedule Template Landscape Design Criteria Template Universal Accessibility Checklist Room Data Sheet Template List of Rooms/Spaces with Areas Template Interaction Adjacency Matrix Template Group Session Meeting Agenda and Notes Template Window Schedule Template Finishes Legend Template Document number EPM-KEA-PR-000001 EPM-KEA-PR-000002 EPM-KEA-GL-000003 EPM-KEA-GL-000004 EPM-KEA-GL-000005 EPM-KEA-GL-000006 EPM-KEA-GL-000007 EPM-KEA-GL-000008 EPM-KEA-GL-000009 EPM-KEA-RG-000001 EPM-KEA-TP-000001 EPM-KEA-TP-000003 EPM-KEA-TP-000004 EPM-KEA-TP-000005 EPM-KEA-TP-000006 EPM-KEA-TP-000010 EPM-KEA-TP-000020 EPM-KEA-TP-000021 EPM-KEA-TP-000022 EPM-KEA-TP-000023 EPM-KEA-TP-000024 EPM-KEA-TP-000025 EPM-KEA-TP-000026 AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 19 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department Document Name Data Sheet Escalator Template Data Sheet Elevator Template Encroachment Application (Permit & Restoration) Template Statement of Works and Proposed Actions Template Conditions for Road Encroachments Template Conditions for Grounds and Landscaping Encroachments Template Solid Core Door Details Hollow Metal Door Details Architectural Abbreviations Architectural Materials Legend Clear Glass Door Details Document number EPM-KEA-TP-000007 EPM-KEA-TP-000008 EPM-KEA-TP-000012 EPM-KEA-TP-000013 EPM-KEA-TP-000014 EPM-KEA-TP-000015 EPM-KEA-05-000001 EPM-KEA-05-000002 EPM-KEA-19-000001 EPM-KEA-11-000001 EPM-KEA-05-000003 Civil & Structural Design Aids Document Name Civil (Site Works and Roads) Design Aids Civil Design Guideline List of Civil Deliverables List of Structural Deliverables Standard Drawing Concrete Cover Requirement Standard Drawing Typical Beam Elevation And Section Standard Drawing Typical Cross-Section Residential Road Standard Drawing Typical Footing Detail Standard Drawing Typical One-Way Slab Detail Structural Design Aids Structural Design Guidelines Surveying Guideline Technical Standardization Plan Universal Accessibility Guidelines Utilities Design Aids Utilities Design Guideline Project Office Facilities Procedure Document number EPM-KEC-GL-000002 EPM-KEC-GL-000001 EPM-KEC-RG-000002 EPM-KES-RG-000001 EPM-KES-05-000005 EPM-KES-05-000002 EPM-KEC-05-000001 EPM-KES-05-000001 EPM-KES-05-000003 EPM-KES-GL-000002 EPM-KES-GL-000001 EPM-KEC-GL-000005 EPM-EN0-PL-000001 EPM-KEA-GL-000004 EPM-KEC-GL-000003 EPM-KEC-GL-000004 EPM-KSS-PR-000025 Electrical Design Aids Document Name AutoCAD General AutoCAD Electrical AutoCAD Telecommunications AutoCAD Geotechnical AutoCAD Telecommunications AutoCAD Safety & Security AutoCAD Utilities AutoCAD Templates Document number EPM-KED-TP-000001 EPM-KED-TP-000004 EPM-KED-TP-000010 EPM-KED-TP-000011 EPM-KED-TP-000012 EPM-KED-TP-000013 EPM-KED-TP-000014 AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 20 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department Document Name Electrical Design Guidelines Electrical Design Aids List of Electrical Design Deliverables Template - Electrical Design Criteria Single Line Diagram for Street Lighting Cable Tray Mechanical Support Details Street Light Pole Base Details Cable Riser Section Emergency Generator Grounding Details Checklist - Lighting & Small Power Layout Checklist - Single Line Diagram Checklist - Conduit (Raceway) Layout Checklist - Cable Rack/Tray Layout Template Checklist - Earthing/Grounding Layout Checklist - Underground (UG) Raceway Layout Template Checklist - Lightning Protection System Layout Template - UPS System Data Sheet Template - Liquid Immersed Distribution Transformer Data Sheet Template - Capacitor Bank Data Sheet Template - Electrical Requirements for Packaged Equipment Data Sheet Prefabricated Substation Buildings Data Sheet – Template Template - DC System Data Sheet Electrical Design Criteria Template Electrical Equipment List Template Template - Dry Type Distribution Transformers Data Sheet Data Sheet - Motor Template Checklist - Interface with Saudi Electricity Company (SEC) Template ELV System Design Guideline ELV System Design Aids List of ELV Design Deliverables ELV Design Criteria Block Diagram – Fire Alarm Riser Diagram Access Control Door Detail Telecommunication and Audio-Visual outlet Mounting Details Surveillance camera Detail IP camera Details Checklist – Distributed Control System (DCS) Block Diagram Template Checklist – CCTV / Surveillance System Layout Checklist – ELV System Schematic Template Checklist – Structured Cabling System Layout Checklist – Access Control System Layout Checklist – Public Address System Layout Checklist – Master Clock System Layout Checklist – Distributed TV System Layout Document number EPM-KEE-GL-000001 EPM-KEE-GL-000003 EPM-KEE-RG-000001 EPM-KEE-TP-000019 EPM-KEE-05-000001 EPM-KEE-05-000002 EPM-KEE-05-000003 EPM-KEE-05-000004 EPM-KEE-05-000005 EPM-KEE-TP-000001 EPM-KEE-TP-000002 EPM-KEE-TP-000003 EPM-KEE-TP-000004 EPM-KEE-TP-000005 EPM-KEE-TP-000006 EPM-KEE-TP-000007 EPM-KEE-TP-000013 EPM-KEE-TP-000014 EPM-KEE-TP-000015 EPM-KEE-TP-000016 EPM-KEE-TP-000017 EPM-KEE-TP-000018 EPM-KEE-TP-000019 EPM-KEE-TP-000020 EPM-KEE-TP-000021 EPM-KEE-TP-000023 EPM-KEE-TP-000024 EPM-KEE-GL-000002 EPM-KEE-GL-000004 EPM-KEE-RG-000002 EPM-KEE-TP-000022 EPM-KEE-05-000006 EPM-KEE-05-000007 EPM-KEE-05-000008 EPM-KEE-05-000009 EPM-KEE-05-000010 EPM-KEE-TP-000009 EPM-KEE-TP-000010 EPM-KEE-TP-000011 EPM-KEE-TP-000012 EPM-KEE-TP-000025 EPM-KEE-TP-000026 EPM-KEE-TP-000027 EPM-KEE-TP-000028 AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 21 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department Document Name Checklist – Audio/Visual System Layout Checklist – Fire Alarm System Layout Checklist – Intercom System Layout Utilities Design Aids Utilities Design Guideline Utility Corridor Criteria Potable and Firewater Design Criteria Sanitary Sewer Design Criteria Utility Layout Drawing Utility Profile Drawings Utility Chamber Schedule Drawing Utilities Typical Chamber Drawing Template Utility Corridors Layout Drawing Block Diagram – Extra Low Voltage Integration lock Diagram – Fire and Life Safety Integration Block Diagram – BMS and Mechanical Integration Document number EPM-KEE-TP-000029 EPM-KEE-TP-000030 EPM-KEE-TP-000031 EPM-KEC-GL-000003 EPM-KEC-GL-000004 EPM-KEC-TP-000020 EPM-KEC-TP-000015 EPM-KEC-TP-000016 EPM-KEC-TP-000007 EPM-KEC-TP-000008 EPM-KEC-TP-000009 EPM-KEC-TP-000010 EPM-KEC-TP-000011 EPM-KEE-13-000001 EPM-KEE-13-000002 EPM-KEE-13-000003 Storm Water Network Design Aids Document Name Checklist - Utility Layout Drawings Checklist - Utility Profile Drawings Checklist - Utility Chamber Schedule Drawings Checklist - Utilities Typical Chamber Drawings Checklist - Utility Corridors Layout Drawings Mechanical Plant Room Layout Drawing Checklist Diesel Generator Data Sheet Template Mechanical Equipment List Storm Water Management Design Criteria Template Utilities Design Aids Utilities Design Guideline Utility Corridor Design Criteria Template Document number EPM-KEC-TP-000007 EPM-KEC-TP-000008 EPM-KEC-TP-000009 EPM-KEC-TP-000010 EPM-KEC-TP-000011 EPM-KEM-TP-000001 EPM-KEM-TP-000010 EPM-KEM-TP-000012 EPM-KEC-TP-000014 EPM-KEC-GL-000003 EPM-KEC-GL-000004 EPM-KEC-TP-000020 Road Design Aids Document Name Checklist - Grading Layouts Drawings Checklist - Road Layout & Profile Drawings Checklist Layout & Profile Drawings Checklist -- Road Grading Cross-Section at Interval Drawings Checklist - Setting-out Layout Drawings Checklist - Road Layout & Profile Drawings Checklist - Road Cross-Section at Interval Drawings Checklist - Road Signage & Marking Drawings Survey Requirement Template Document number EPM-KEC-TP-000001 EPM-KEC-TP-000002 EPM-KEC-TP-000003 EPM-KEC-TP-000004 EPM-KEC-TP-000005 EPM-KEC-TP-000006 EPM-KEC-TP-000012 AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 22 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department Document Name Road Pavement Design Criteria Template Earthwork and Grading Design Criteria Template Traffic & Transportation Design Criteria Template Streets & Roadways Design Criteria Template Streets & Roadways Design Criteria Template List of Civil Deliverables Typical Cross-Section-Residential Road Typical Barrier Types Curb and Gutter Detail Pre-cast Unit Paving Blocks Sewer Line Pipeline Section Civil Design Guidelines Civil (Site Work Roads) Design Aids Surveying Guidelines Document number EPM-KEC-TP-000013 EPM-KEC-TP-000017 EPM-KEC-TP-000019 EPM-KEC-TP-000021 EPM-KEC-RG-000002 EPM-KEC-05-000001 EPM-KEC-05-000002 EPM-KEC-05-000003 EPM-KEC-05-000004 EPM-KEC-05-000005 EPM-KEC-GL-000001 EPM-KEC-GL-000002 EPM-KEC-GL-000003 Mechanical Design Aids Document Name Mechanical Design Guidelines Mechanical Design Aids Mechanical Plant Room Layout Drawing Checklist HVAC Riser Diagram Checklist HVAC (Duct) Layout Drawing Checklist Piping & Instrumentation Diagram Checklist Equipment Schedule Checklist Fire Protection (Pipe) Layout Drawing Checklist U/G Utility (Pipe) Layout Drawing Checklist Diesel Generator Data Sheet Template Mechanical Equipment List Template - Mechanical Design Criteria Potable and Firewater Design Criteria Miscellaneous Chemical Feed System Data Sheet Template Atmospheric Bulk Chemical Feed System Data Sheet Template Horizontal Centrifugal Pump Data Sheet Template Sump Pump Data Sheet Template Roof Mounted Vent Fan Assembly Data Sheet Template Sewage Lift Station Data Sheet Template Hydro-pneumatic Tank System Data Sheet Template Standard Mechanical Design Deliverables Checklist District Cooling Design Guideline List of Mechanical Deliverables Document number EPM-KEM-GL-000001 EPM-KEM-GL-000002 EPM-KEM-TP-000001 EPM-KEM-TP-000002 EPM-KEM-TP-000003 EPM-KEM-TP-000004 EPM-KEM-TP-000005 EPM-KEM-TP-000006 EPM-KEM-TP-000007 EPM-KEM-TP-000010 EPM-KEM-TP-000012 EPM-KEM-TP-000014 EPM-KEM-TP-000015 EPM-KEM-TP-000016 EPM-KEM-TP-000017 EPM-KEM-TP-000018 EPM-KEM-TP-000019 EPM-KEM-TP-000020 EPM-KEM-TP-000021 EPM-KEM-TP-000022 EPM-KEM-TP-000026 EPM-KEM-GL-000003 EPM-KEM-RG-000001 AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 23 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department 7.2.3 Crossing, Bridges and Tunnels Department – Design The procedures, processes, guidelines, and templates listed below apply to Crossing, Bridges and Tunnels Design in line with EXPRO National Manual for Projects Management. Architectural Design Aids Document Name Encroachment Permits Procedure Universal Accessibility Finishing Material Schedule Data Sheet Elevator List of Architectural Deliverables Architectural Drawings Checklist Architectural Design Criteria Material Finish Schedule Template Landscape Design Criteria Template Universal Accessibility Checklist Interaction Adjacency Matrix Template Group Session Meeting Agenda and Notes Template Finishes Legend Template Data Sheet Elevator Template Encroachment Application (Permit & Restoration) Template Statement of Works and Proposed Actions Template Conditions for Road Encroachments Template Conditions for Grounds and Landscaping Encroachments Template Document number EPM-KEA-PR-000001 EPM-KEA-GL-000004 EPM-KEA-GL-000007 EPM-KEA-GL-000009 EPM-KEA-RG-000001 EPM-KEA-TP-000001 EPM-KEA-TP-000003 EPM-KEA-TP-000006 EPM-KEA-TP-000010 EPM-KEA-TP-000020 EPM-KEA-TP-000023 EPM-KEA-TP-000024 EPM-KEA-TP-000026 EPM-KEA-TP-000008 EPM-KEA-TP-000012 EPM-KEA-TP-000013 EPM-KEA-TP-000014 EPM-KEA-TP-000015 Civil & Structure Design Aids Document Name Civil (Site Works and Roads) Design Aids Civil Design Guideline List of Civil Deliverables List of Structural Deliverables Standard Drawing Concrete Cover Requirement Standard Drawing Typical Beam Elevation And Section Standard Drawing Typical Cross-Section Residential Road Standard Drawing Typical Footing Detail Standard Drawing Typical One-Way Slab Detail Structural Design Aids Structural Design Guidelines Document number EPM-KEC-GL-000002 EPM-KEC-GL-000001 EPM-KEC-RG-000002 EPM-KES-RG-000001 EPM-KES-05-000005 EPM-KES-05-000002 EPM-KEC-05-000001 EPM-KES-05-000001 EPM-KES-05-000003 EPM-KES-GL-000002 EPM-KES-GL-000001 AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 24 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department Document Name Surveying Guideline Technical Standardization Plan Universal Accessibility Guidelines Utilities Design Aids Utilities Design Guideline Project Construction Constructability Check List Document number EPM-KEC-GL-000005 EPM-EN0-PL-000001 EPM-KEA-GL-000004 EPM-KEC-GL-000003 EPM-KEC-GL-000004 EPM-KCC-TP-000013 Electrical Design Aids Document Name AutoCAD General AutoCAD Electrical AutoCAD Telecommunications AutoCAD Geotechnical AutoCAD Telecommunications AutoCAD Safety & Security AutoCAD Utilities AutoCAD Templates Electrical Design Guidelines Electrical Design Aids List of Electrical Design Deliverables Template - Electrical Design Criteria Single Line Diagram for Street Lighting Cable Tray Mechanical Support Details Street Light Pole Base Details Cable Riser Section Emergency Generator Grounding Details Checklist - Lighting & Small Power Layout Checklist - Single Line Diagram Checklist - Conduit (Raceway) Layout Checklist - Cable Rack/Tray Layout Template Checklist - Earthing/Grounding Layout Checklist - Underground (UG) Raceway Layout Template Checklist - Lightning Protection System Layout Template - Liquid Immersed Distribution Transformer Data Sheet Template - Electrical Requirements for Packaged Equipment Data Sheet Prefabricated Substation Buildings Data Sheet - Template Electrical Design Criteria Template Electrical Equipment List Template Template - Dry Type Distribution Transformers Data Sheet Data Sheet - Motor Template Checklist - Interface with Saudi Electricity Company (SEC) Template ELV System Design Guideline ELV System Design Aids List of ELV Design Deliverables Document number EPM-KED-TP-000001 EPM-KED-TP-000004 EPM-KED-TP-000010 EPM-KED-TP-000011 EPM-KED-TP-000012 EPM-KED-TP-000013 EPM-KED-TP-000014 EPM-KEE-GL-000001 EPM-KEE-GL-000003 EPM-KEE-RG-000001 EPM-KEE-TP-000019 EPM-KEE-05-000001 EPM-KEE-05-000002 EPM-KEE-05-000003 EPM-KEE-05-000004 EPM-KEE-05-000005 EPM-KEE-TP-000001 EPM-KEE-TP-000002 EPM-KEE-TP-000003 EPM-KEE-TP-000004 EPM-KEE-TP-000005 EPM-KEE-TP-000006 EPM-KEE-TP-000007 EPM-KEE-TP-000014 EPM-KEE-TP-000016 EPM-KEE-TP-000017 EPM-KEE-TP-000019 EPM-KEE-TP-000020 EPM-KEE-TP-000021 EPM-KEE-TP-000023 EPM-KEE-TP-000024 EPM-KEE-GL-000002 EPM-KEE-GL-000004 EPM-KEE-RG-000002 AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 25 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department Document Name ELV Design Criteria Block Diagram – Fire Alarm Riser Diagram Access Control Door Detail Checklist – Distributed Control System (DCS) Block Diagram Template Checklist – Structured Cabling System Layout Utilities Design Aids Utilities Design Guideline Utility Corridor Criteria Potable and Firewater Design Criteria Utility Layout Drawings Utility Profile Drawings Utility Chamber Schedule Drawings Utilities Typical Chamber Drawing - Template Utility Corridors Layout Drawing Block Diagram – Extra Low Voltage Integration Block Diagram – Fire and Life Safety Integration Block Diagram – BMS and Mechanical Integration Document number EPM-KEE-TP-000022 EPM-KEE-05-000006 EPM-KEE-05-000007 EPM-KEE-TP-000009 EPM-KEE-TP-000012 EPM-KEC-GL-000003 EPM-KEC-GL-000004 EPM-KEC-TP-000020 EPM-KEC-TP-000015 EPM-KEC-TP-000007 EPM-KEC-TP-000008 EPM-KEC-TP-000009 EPM-KEC-TP-000010 EPM-KEC-TP-000011 EPM-KEE-13-000001 EPM-KEE-13-000002 EPM-KEE-13-000003 Storm Water Network Design Aids Document Name Checklist - Utility Layout Drawings Checklist - Utility Profile Drawings Checklist - Utility Chamber Schedule Drawings Checklist - Utilities Typical Chamber Drawings Checklist - Utility Corridors Layout Drawings Mechanical Plant Room Layout Drawing Checklist Diesel Generator Data Sheet Template Mechanical Equipment List Storm Water Management Design Criteria Template Utilities Design Aids Utilities Design Guideline Utility Corridor Design Criteria Template Document number EPM-KEC-TP-000007 EPM-KEC-TP-000008 EPM-KEC-TP-000009 EPM-KEC-TP-000010 EPM-KEC-TP-000011 EPM-KEM-TP-000001 EPM-KEM-TP-000010 EPM-KEM-TP-000012 EPM-KEC-TP-000014 EPM-KEC-GL-000003 EPM-KEC-GL-000004 EPM-KEC-TP-000020 Road Design Aids Document Name Checklist - Grading Layouts Drawings Checklist - Road Layout & Profile Drawings Checklist Layout & Profile Drawings Checklist -- Road Grading Cross-Section at Interval Drawings Checklist - Setting-out Layout Drawings Checklist - Road Layout & Profile Drawings Checklist - Road Cross-Section at Interval Drawings Checklist - Road Signage & Marking Drawings Survey Requirement Template Document number EPM-KEC-TP-000001 EPM-KEC-TP-000002 EPM-KEC-TP-000003 EPM-KEC-TP-000004 EPM-KEC-TP-000005 EPM-KEC-TP-000006 EPM-KEC-TP-000012 AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 26 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department Document Name Road Pavement Design Criteria Template Earthwork and Grading Design Criteria Template Traffic & Transportation Design Criteria Template Streets & Roadways Design Criteria Template Streets & Roadways Design Criteria Template List of Civil Deliverables Typical Cross-Section-Residential Road Typical Barrier Types Curb and Gutter Detail Pre-cast Unit Paving Blocks Sewer Line Pipeline Section Civil Design Guidelines Civil (Site Work Roads) Design Aids Surveying Guidelines Document number EPM-KEC-TP-000013 EPM-KEC-TP-000017 EPM-KEC-TP-000019 EPM-KEC-TP-000021 EPM-KEC-RG-000002 EPM-KEC-05-000001 EPM-KEC-05-000002 EPM-KEC-05-000003 EPM-KEC-05-000004 EPM-KEC-05-000005 EPM-KEC-GL-000001 EPM-KEC-GL-000002 EPM-KEC-GL-000003 Facilities Design Aids Document Name Mechanical Design Aids HVAC (Duct) Layout Drawing Checklist Piping & Instrumentation Diagram Checklist Equipment Schedule Checklist Fire Protection (Pipe) Layout Drawing Checklist U/G Utility (Pipe) Layout Drawing Checklist Diesel Generator Data Sheet Template Mechanical Equipment List Template - Mechanical Design Criteria Miscellaneous Chemical Feed System Data Sheet Template Atmospheric Bulk Chemical Feed System Data Sheet Template Horizontal Centrifugal Pump Data Sheet Template Sump Pump Data Sheet Template Roof Mounted Vent Fan Assembly Data Sheet Template Sewage Lift Station Data Sheet Template Hydro-pneumatic Tank System Data Sheet Template Standard mechanical design deliverables checklist Document number EPM-KEM-GL-000002 EPM-KEM-TP-000003 EPM-KEM-TP-000004 EPM-KEM-TP-000005 EPM-KEM-TP-000006 EPM-KEM-TP-000007 EPM-KEM-TP-000010 EPM-KEM-TP-000012 EPM-KEM-TP-000014 EPM-KEM-TP-000016 EPM-KEM-TP-000017 EPM-KEM-TP-000018 EPM-KEM-TP-000019 EPM-KEM-TP-000020 EPM-KEM-TP-000021 EPM-KEM-TP-000022 EPM-KEM-TP-000026 Mechanical Design Aids Document Name Mechanical Design Guidelines Mechanical Design Aids Mechanical Plant Room Layout Drawing Checklist HVAC Riser Diagram Checklist HVAC (Duct) Layout Drawing Checklist Piping & Instrumentation Diagram Checklist Document number EPM-KEM-GL-000001 EPM-KEM-GL-000002 EPM-KEM-TP-000001 EPM-KEM-TP-000002 EPM-KEM-TP-000003 EPM-KEM-TP-000004 AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 27 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department Document Name Equipment Schedule Checklist Fire Protection (Pipe) Layout Drawing Checklist U/G Utility (Pipe) Layout Drawing Checklist Diesel Generator Data Sheet Template Mechanical Equipment List Template - Mechanical Design Criteria Potable and Firewater Design Criteria Miscellaneous Chemical Feed System Data Sheet Template Atmospheric Bulk Chemical Feed System Data Sheet Template Horizontal Centrifugal Pump Data Sheet Template Sump Pump Data Sheet Template Roof Mounted Vent Fan Assembly Data Sheet Template Sewage Lift Station Data Sheet Template Hydro-pneumatic Tank System Data Sheet Template Standard mechanical design deliverables checklist District Cooling Design Guideline List of Mechanical Deliverables Document number EPM-KEM-TP-000005 EPM-KEM-TP-000006 EPM-KEM-TP-000007 EPM-KEM-TP-000010 EPM-KEM-TP-000012 EPM-KEM-TP-000014 EPM-KEM-TP-000015 EPM-KEM-TP-000016 EPM-KEM-TP-000017 EPM-KEM-TP-000018 EPM-KEM-TP-000019 EPM-KEM-TP-000020 EPM-KEM-TP-000021 EPM-KEM-TP-000022 EPM-KEM-TP-00 0026 EPM-KEM-GL-000003 EPM-KEM-RG-000001 7.2.4 Roads and Lighting Department – Design The procedures, processes, guidelines, and templates listed below apply to Roads and Lighting Design in line with EXPRO National Manual for Projects Management. Architectural Design Aids Document Name Encroachment Permits Procedure Saudi Arabia Archeology Regulations Procedure Door and Window schedule Universal Accessibility Guidelines Landscape Architecture Design Program of Rooms / Spaces for Building Design Report Finishing Material Schedule Data Sheet Escalator Data Sheet Elevator List of Architectural Deliverables Architectural Drawings Checklist Architectural Design Criteria Final Report of Program of Rooms/Spaces for Building Design Door Schedule Template Material Finish Schedule Template Landscape Design Criteria Template Document number EPM-KEA-PR-000001 EPM-KEA-PR-000002 EPM-KEA-GL-000003 EPM-KEA-GL-000004 EPM-KEA-GL-000005 EPM-KEA-GL-000006 EPM-KEA-GL-000007 EPM-KEA-GL-000008 EPM-KEA-GL-000009 EPM-KEA-RG-000001 EPM-KEA-TP-000001 EPM-KEA-TP-000003 EPM-KEA-TP-000004 EPM-KEA-TP-000005 EPM-KEA-TP-000006 EPM-KEA-TP-000010 AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 28 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department Document Name Universal Accessibility Checklist Room Data Sheet Template List of Rooms/Spaces with Areas Template Interaction Adjacency Matrix Template Group Session Meeting Agenda and Notes Template Window Schedule Template Finishes Legend Template Data Sheet Escalator Template Data Sheet Elevator Template Encroachment Application (Permit & Restoration) Template Statement of Works and Proposed Actions Template Conditions for Road Encroachments Template Conditions for Grounds and Landscaping Encroachments Template Solid Core Door Details Hollow Metal Door Details Architectural Abbreviations Architectural Materials Legend Clear Glass Door Details Document number EPM-KEA-TP-000020 EPM-KEA-TP-000021 EPM-KEA-TP-000022 EPM-KEA-TP-000023 EPM-KEA-TP-000024 EPM-KEA-TP-000025 EPM-KEA-TP-000026 EPM-KEA-TP-000007 EPM-KEA-TP-000008 EPM-KEA-TP-000012 EPM-KEA-TP-000013 EPM-KEA-TP-000014 EPM-KEA-TP-000015 EPM-KEA-05-000001 EPM-KEA-05-000002 EPM-KEA-19-000001 EPM-KEA-11-000001 EPM-KEA-05-000003 Civil & Structural Design Aids Document Name Civil (Site Works and Roads) Design Aids Civil Design Guideline List of Civil Deliverables List of Structural Deliverables Standard Drawing Concrete Cover Requirement Standard Drawing Typical Beam Elevation and Section Standard Drawing Typical Cross-Section Residential Road Standard Drawing Typical Footing Detail Standard Drawing typical One-Way Slab Detail Structural Design Aids Structural Design Guidelines Surveying Guideline Technical Standardization Plan Universal Accessibility Guidelines Utilities Design Aids Utilities Design Guideline Civil (Site Works and Roads) Design Aids Standard drawing single line diagram for street lighting Document number EPM-KEC-GL-000002 EPM-KEC-GL-000001 EPM-KEC-RG-000002 EPM-KES-RG-000001 EPM-KES-05-000005 EPM-KES-05-000002 EPM-KEC-05-000001 EPM-KES-05-000001 EPM-KES-05-000003 EPM-KES-GL-000002 EPM-KES-GL-000001 EPM-KEC-GL-000005 EPM-EN0-PL-000001 EPM-KEA-GL-000004 EPM-KEC-GL-000003 EPM-KEC-GL-000004 EPM-KEC-GL-000002 EPM-KEE-05-000001 Electrical Design Aids AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 29 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department Document Name Technical Standardization plan Graphical Blocks and Symbols Guide Auto Cad General Auto Cad Templates Electrical Design Guidelines Electrical Design Aids List of Electrical Design Deliverables Template - Electrical Design Criteria Single Line Diagram for Street Lighting Cable Tray Mechanical Support Details Street Light Pole Base Details Cable Riser Section Emergency Generator Grounding Details Checklist - Lighting & Small Power Layout Checklist - Single Line Diagram Checklist - Conduit (Raceway) Layout Checklist - Cable Rack/Tray Layout Template Checklist - Earthing/Grounding Layout Checklist - Underground (UG) Raceway Layout Template Checklist - Interface with Saudi Electricity Company (SEC) Template Checklist - Lightning Protection System Layout Template - UPS System Data Sheet Template - Liquid Immersed Distribution Transformer Data Sheet Template - Capacitor Bank Data Sheet Template - Electrical Requirements for Packaged Equipment Data Sheet Prefabricated Substation Buildings Data Sheet - Template Template - DC System Data Sheet Template - Standard List of Electrical Equipment Template - Dry Type Distribution Transformers Data Sheet Data Sheet - Motor Template ELV System Design Guideline ELV System Design Aids List of ELV Design Deliverables ELV Design Criteria Block Diagram – Fire Alarm Riser Diagram Checklist – ELV System Schematic Template Checklist – Structured Cabling System Layout Checklist – Fire Alarm System Layout Block Diagram – Extra Low Voltage Integration Lock Diagram – Fire and Life Safety Integration Block Diagram – BMS and Mechanical Integration Document number EPM-EN0-PL-000001 EPM-KED-GL-000001 EPM-KED-TP-000001 EPM-KED-TP-000014 EPM-KEE-GL-000001 EPM-KEE-GL-000003 EPM-KEE-RG-000001 EPM-KEE-TP-000019 EPM-KEE-05-000001 EPM-KEE-05-000002 EPM-KEE-05-000003 EPM-KEE-05-000004 EPM-KEE-05-000005 EPM-KEE-TP-000001 EPM-KEE-TP-000002 EPM-KEE-TP-000003 EPM-KEE-TP-000004 EPM-KEE-TP-000005 EPM-KEE-TP-000006 EPM-KEE-TP-000024 EPM-KEE-TP-000007 EPM-KEE-TP-000013 EPM-KEE-TP-000014 EPM-KEE-TP-000015 EPM-KEE-TP-000016 EPM-KEE-TP-000017 EPM-KEE-TP-000018 EPM-KEE-TP-000020 EPM-KEE-TP-000021 EPM-KEE-TP-000023 EPM-KEE-GL-000002 EPM-KEE-GL-000004 EPM-KEE-RG-000002 EPM-KEE-TP-000022 EPM-KEE-05-000006 EPM-KEE-TP-000011 EPM-KEE-TP-000012 EPM-KEE-TP-000030 EPM-KEE-13-000001 EPM-KEE-13-000002 EPM-KEE-13-000003 Storm Water Network Design Aids AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 30 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department Document Name Checklist - Utility Layout Drawings Checklist - Utility Profile Drawings Checklist - Utility Chamber Schedule Drawings Checklist - Utilities Typical Chamber Drawings Checklist - Utility Corridors Layout Drawings Mechanical Plant Room Layout Drawing Checklist Diesel Generator Data Sheet Template Mechanical Equipment List Storm Water Management Design Criteria Template Utilities Design Aids Utilities Design Guideline Utility Corridor Design Criteria Template Document number EPM-KEC-TP-000007 EPM-KEC-TP-000008 EPM-KEC-TP-000009 EPM-KEC-TP-000010 EPM-KEC-TP-000011 EPM-KEM-TP-000001 EPM-KEM-TP-000010 EPM-KEM-TP-000012 EPM-KEC-TP-000014 EPM-KEC-GL-000003 EPM-KEC-GL-000004 EPM-KEC-TP-000020 Road Design Aids Document Name Checklist - Grading Layouts Drawings Checklist - Road Layout & Profile Drawings Checklist Layout & Profile Drawings Checklist -- Road Grading Cross-Section at Interval Drawings Checklist – Setting out Layout Drawings Checklist - Road Layout & Profile Drawings Checklist - Road Cross-Section at Interval Drawings Checklist - Road Signage & Marking Drawings Survey Requirement Template Road Pavement Design Criteria Template Earthwork and Grading Design Criteria Template Traffic & Transportation Design Criteria Template Streets & Roadways Design Criteria Template Streets & Roadways Design Criteria Template List of Civil Deliverables Typical Cross-Section-Residential Road Typical Barrier Types Curb and Gutter Detail Pre-cast Unit Paving Blocks Sewer Line Pipeline Section Civil Design Guidelines Civil (Site Work Roads) Design Aids Surveying Guidelines Document number EPM-KEC-TP-000001 EPM-KEC-TP-000002 EPM-KEC-TP-000003 EPM-KEC-TP-000004 EPM-KEC-TP-000005 EPM-KEC-TP-000006 EPM-KEC-TP-000012 EPM-KEC-TP-000013 EPM-KEC-TP-000017 EPM-KEC-TP-000019 EPM-KEC-TP-000021 EPM-KEC-RG-000002 EPM-KEC-05-000001 EPM-KEC-05-000002 EPM-KEC-05-000003 EPM-KEC-05-000004 EPM-KEC-05-000005 EPM-KEC-GL-000001 EPM-KEC-GL-000002 EPM-KEC-GL-000003 Utilities & Facilities – Design Aids Document Name Mechanical Design Aids Mechanical Plant Room Layout Drawing Checklist Plant Room Layout Drawing Checklist HVAC Riser Diagram Checklist HVAC (Duct) Layout Drawing Checklist Piping & Instrumentation Diagram Checklist Document number EPM-KEM-GL-000002 EPM-KEM-TP-000001 EPM-KEM-TP-000002 EPM-KEM-TP-000003 EPM-KEM-TP-000004 AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 31 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department Document Name Equipment Schedule Checklist Fire Protection (Pipe) Layout Drawing Checklist U/G Utility (Pipe) Layout Drawing Checklist Diesel Generator Data Sheet Template Mechanical Equipment List Template - Mechanical Design Criteria Miscellaneous Chemical Feed System Data Sheet Template Atmospheric Bulk Chemical Feed System Data Sheet Template Horizontal Centrifugal Pump Data Sheet Template Sump Pump Data Sheet Template Roof Mounted Vent Fan Assembly Data Sheet Template Sewage Lift Station Data Sheet Template Hydro-pneumatic Tank System Data Sheet Template Standard mechanical design deliverables checklist Document number EPM-KEM-TP-000005 EPM-KEM-TP-000006 EPM-KEM-TP-000007 EPM-KEM-TP-000010 EPM-KEM-TP-000012 EPM-KEM-TP-000014 EPM-KEM-TP-000016 EPM-KEM-TP-000017 EPM-KEM-TP-000018 EPM-KEM-TP-000019 EPM-KEM-TP-000020 EPM-KEM-TP-000021 EPM-KEM-TP-000022 EPM-KEM-TP-000026 Mechanical Design Aids Document Name Mechanical Design Guidelines Mechanical Design Aids Mechanical Plant Room Layout Drawing Checklist HVAC Riser Diagram Checklist HVAC (Duct) Layout Drawing Checklist Piping & Instrumentation Diagram Checklist Equipment Schedule Checklist Fire Protection (Pipe) Layout Drawing Checklist U/G Utility (Pipe) Layout Drawing Checklist Diesel Generator Data Sheet Template Mechanical Equipment List Template - Mechanical Design Criteria Potable and Firewater Design Criteria Miscellaneous Chemical Feed System Data Sheet Template Atmospheric Bulk Chemical Feed System Data Sheet Template Horizontal Centrifugal Pump Data Sheet Template Sump Pump Data Sheet Template Roof Mounted Vent Fan Assembly Data Sheet Template Sewage Lift Station Data Sheet Template Hydro-pneumatic Tank System Data Sheet Template Standard mechanical design deliverables checklist District Cooling Design Guideline List of Mechanical Deliverables Document number EPM-KEM-GL-000001 EPM-KEM-GL-000002 EPM-KEM-TP-000001 EPM-KEM-TP-000002 EPM-KEM-TP-000003 EPM-KEM-TP-000004 EPM-KEM-TP-000005 EPM-KEM-TP-000006 EPM-KEM-TP-000007 EPM-KEM-TP-000010 EPM-KEM-TP-000012 EPM-KEM-TP-000014 EPM-KEM-TP-000015 EPM-KEM-TP-000016 EPM-KEM-TP-000017 EPM-KEM-TP-000018 EPM-KEM-TP-000019 EPM-KEM-TP-000020 EPM-KEM-TP-000021 EPM-KEM-TP-000022 EPM-KEM-TP-000026 EPM-KEM-GL-000003 EPM-KEM-RG-000001 AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 32 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department 7.2.5 Stormwater Network Department – Design The procedures, processes, guidelines, and templates listed below apply to Stormwater Network Design in line with EXPRO National Manual for Projects Management. Civil & Structural Design Aids Document Name Civil (Site Works and Roads) Design Aids Civil Design Guideline List of Civil Deliverables List of Structural Deliverables Standard Drawing Concrete Cover Requirement Standard Drawing Typical Beam Elevation And Section Standard Drawing Typical Cross-Section Residential Road Standard Drawing Typical Footing Detail Standard Drawing typical One-Way Slab Detail Structural Design Aids Structural Design Guidelines Surveying Guideline Technical Standardization Plan Universal Accessibility Guidelines Utilities Design Aids Utilities Design Guideline Project Construction Constructability Check List Storm Water Management Design Criteria Template Document number EPM-KEC-GL-000002 EPM-KEC-GL-000001 EPM-KEC-RG-000002 EPM-KES-RG-000001 EPM-KES-05-000005 EPM-KES-05-000002 EPM-KEC-05-000001 EPM-KES-05-000001 EPM-KES-05-000003 EPM-KES-GL-000002 EPM-KES-GL-000001 EPM-KEC-GL-000005 EPM-EN0-PL-000001 EPM-KEA-GL-000004 EPM-KEC-GL-000003 EPM-KEC-GL-000004 EPM-KCC-TP-000013 EPM-KEC-TP-000014 Stormwater Design Aids Document Name Checklist - Utility Layout Drawings Checklist - Utility Profile Drawings Checklist - Utility Chamber Schedule Drawings Checklist - Utilities Typical Chamber Drawings Checklist - Utility Corridors Layout Drawings Mechanical Plant Room Layout Drawing Checklist Diesel Generator Data Sheet Template Mechanical Equipment List Storm Water Management Design Criteria Template Utilities Design Aids Utilities Design Guideline Utility Corridor Design Criteria Template Document number EPM-KEC-TP-000007 EPM-KEC-TP-000008 EPM-KEC-TP-000009 EPM-KEC-TP-000010 EPM-KEC-TP-000011 EPM-KEM-TP-000001 EPM-KEM-TP-000010 EPM-KEM-TP-000012 EPM-KEC-TP-000014 EPM-KEC-GL-000003 EPM-KEC-GL-000004 EPM-KEC-TP-000020 AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 33 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department Electrical Design Aids Document Name Graphic Blocks and Symbols Guidelines AutoCAD General AutoCAD Electrical AutoCAD Telecommunications AutoCAD Geotechnical AutoCAD Telecommunications AutoCAD Safety & Security AutoCAD Utilities AutoCAD Templates Electrical Design Guidelines Electrical Design Aids List of Electrical Design Deliverables Template - Electrical Design Criteria Single Line Diagram for Street Lighting Cable Tray Mechanical Support Details Emergency Generator Grounding Details Checklist - Lighting & Small Power Layout Checklist - Single Line Diagram Checklist - Conduit (Raceway) Layout Checklist - Cable Rack/Tray Layout Template Checklist - Earthing/Grounding Layout Checklist - Underground (UG) Raceway Layout Template Electrical Design Criteria Template Electrical Equipment List Template Template - Dry Type Distribution Transformers Data Sheet Data Sheet - Motor Template Checklist - Interface with Saudi Electricity Company (SEC) Template ELV System Design Guideline ELV System Design Aids List of ELV Design Deliverables ELV Design Criteria Block Diagram – Fire Alarm Riser Diagram Access Control Door Detail Checklist – Structured Cabling System Layout Utilities Design Aids Utilities Design Guideline Utility Corridor Criteria Utility Layout Drawings Utility Profile Drawings Utility Chamber Schedule Drawings Utilities Typical Chamber Drawing Template Document number EPM-KED-GL-000001 EPM-KED-TP-000001 EPM-KED-TP-000004 EPM-KED-TP-000010 EPM-KED-TP-000011 EPM-KED-TP-000012 EPM-KED-TP-000013 EPM-KED-TP-000014 EPM-KEE-GL-000001 EPM-KEE-GL-000003 EPM-KEE-RG-000001 EPM-KEE-TP-000019 EPM-KEE-05-000001 EPM-KEE-05-000002 EPM-KEE-05-000005 EPM-KEE-TP-000001 EPM-KEE-TP-000002 EPM-KEE-TP-000003 EPM-KEE-TP-000004 EPM-KEE-TP-000005 EPM-KEE-TP-000006 EPM-KEE-TP-000019 EPM-KEE-TP-000020 EPM-KEE-TP-000021 EPM-KEE-TP-000023 EPM-KEE-TP-000024 EPM-KEE-GL-000002 EPM-KEE-GL-000004 EPM-KEE-RG-000002 EPM-KEE-TP-000022 EPM-KEE-05-000006 EPM-KEE-05-000007 EPM-KEE-TP-000012 EPM-KEC-GL-000003 EPM-KEC-GL-000004 EPM-KEC-TP-000020 EPM-KEC-TP-000007 EPM-KEC-TP-000008 EPM-KEC-TP-000009 EPM-KEC-TP-000010 AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 34 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department Document Name Utility Corridors Layout Drawing Document number EPM-KEC-TP-000011 7.3 Contracts Management References: Document Name Introduction to Contracts and Tendering Contracting Strategy and Reporting Procedure Requisitions for Tendering Procedure Prequalification of Tenderers Procedure Advertising of Prequalification and Tendering Procedure Preparation and Issuance of Tender Documents Procedure Tender Evaluation Criteria Procedure Pre-Tender Meeting Procedure Tender Period Communications & Addenda Procedure Project Tender Receipt and Opening Procedure Tender Evaluation and Negotiation Procedure Recommendations to Award Procedure Award and Contract Execution Procedure Agreement Kick-Off Meeting Procedure Insurances, Defects, and Warranties Procedure Performance Bonds Procedure Correspondence Procedure Variation and Change Order Management Procedure Claims by 2nd Parties Procedure Preliminary and Final Handover Procedure Performance Evaluations Procedure Contract Closeout Procedure Invoicing & Payment Procedure Document number EPM-KD0-GL-000001 EPM-KD0-PR-000001 EPM-KD0-PR-000002 EPM-KD0-PR-000003 EPM-KD0-PR-000004 EPM-KD0-PR-000005 EPM-KD0-PR-000006 EPM-KD0-PR-000007 EPM-KD0-PR-000008 EPM-KD0-PR-000009 EPM-KD0-PR-000010 EPM-KD0-PR-000011 EPM-KD0-PR-000012 EPM-KD0-PR-000013 EPM-KD0-PR-000014 EPM-KD0-PR-000015 EPM-KD0-PR-000016 EPM-KD0-PR-000017 EPM-KD0-PR-000018 EPM-KD0-PR-000019 EPM-KD0-PR-000021 EPM-KD0-PR-000022 EPM-KD0-PR-000023 7.4 Project Controls References: Document Name Project Schedule Hierarchy Procedure Project Schedule Curves Procedure Project Schedule Contingency Procedure Project Contractor Requirements Procedure Project Schedule Standards and Quality Procedure Project Schedule Lookahead Procedure Project Schedule Claims Procedure Project Coding Structures Procedure Document number EPM-KPP-PR-000002 EPM-KPP-PR-000003 EPM-KPP-PR-000004 EPM-KPP-PR-000005 EPM-KPP-PR-000006 EPM-KPP-PR-000007 EPM-KPP-PR-000008 EPM-KPC-PR-000001 AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 35 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department Document Name Project Management of Change Procedure Project Trend Program Procedure Project Cost and Commitment Procedure Project Forecasting Procedure Project Budget Control Procedure Project Planning and Scheduling Definitions and Concepts Procedure Project Back charges Procedure Introduction to Contract and Procurement Project Controls & Reporting Introduction Guideline Project Standard Document Numbering Procedure Project Controls Bid Package Input Form – Attachment 4 Project Estimate Introduction Guideline Project Estimate Types Procedure Project Estimating Coding Procedure Project Estimate Methodology / Development Procedure Project Estimate Review Procedure Project Estimate Approval Procedure Project Initial Cost Estimate (Class 5) Procedure Project Cost Estimate (Class 4) Procedure Project Simplified Stage Gate Procedure Project Historical Cost Reporting Procedure Document number EPM-KPC-PR-000008 EPM-KPC-PR-000007 EPM-KPC-PR-000003 EPM-KPC-PR-000004 EPM-KPC-PR-000002 EPM-KPP-PR-000001 EPM-KPC-PR-000009 EPM-KD0-GL-000001 EPM-KP0-GL-000001 EPM-KR0-PR-000002 EPM-KPC-TP-000007 EPM-KPE-GL-000001 EPM-KPE-PR-000001 EPM-KPE-PR-000002 EPM-KPE-PR-000003 EPM-KPE-PR-000004 EPM-KPE-PR-000005 ENT-S00-PR-000006 EPM-S00-PR-000006 EPM-EQ0-PR-000004 EPM-KPC-PR-000012 7.5 Excellence References: Document Name Entity Continuous Improvement Program Management Procedure Entity Continuous Improvement Project Management Procedure Entity Key Performance Indicator Procedure EXPRO Definitions and Acronyms Guideline Entity Risk Management Procedure Entity Risk Management Survey Procedure Entity Records Retention Procedure Document number ENT-EC0-PR-000001 ENT-EC0-PR-000002 ENT-EQ0-PR-000001 ENT-E00-GL-000001 ENT-EM0-PR-000001 ENT-EM0-PR-000002 ENT-IRR-PR-000001 7.6 Document Control References: Document Name Standard Document Numbering Procedure Hard Copy Filing Procedure Document Development Procedure Inter Department Review (IDR) Procedure Records Retention Procedure Document Numbering Register Document number AJS-A01-ID0-PR-000002 AJS-A01-ID0-PR-000003 AJS-A01-ID0-PR-000004 AJS-A01-ID0-PR-000005 AJS-A01-IRR-PR-000006 AJS-A01-ID0-RG-000001 AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 36 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department 7.7 Construction References: Document Name Project Construction Management Introduction Project Construction General Procedure Project Construction Constructability Procedure Project Construction Constructability Suggestion Form Template Project Construction Constructability Suggestion Log Template Project Construction Constructability Checklist Template Project Construction Field Works Activities Procedure Project Construction Three Week Look Ahead Template Project Construction STARRT Card Template Project Construction Method Statement Guideline Project Construction Punch List Procedure Project Construction Contractor Punch List Form Template Project Construction Completions and Turnover Procedure Project Construction Punch List Form Template Project Construction Initial Acceptance Checklist Template Project Construction Initial Acceptance Deficiencies List Template Project Construction Initial Acceptance Exceptions List Template Project Construction Initial Acceptance Certificate Template Project Construction Final Acceptance Certificate Template Project Construction Turnover Certificate Template Project Construction Turnover Package Template Project Construction Progress Reports Procedure Project Construction Contractors Daily Report Template Project Construction Contractors Weekly Report Template Project Construction Contractors Monthly Report Template Project Construction Site Construction Department Project Construction Field Change Document Procedure Project Construction Field Change Document Form Template Project Construction Technical Query Procedure Project Construction Technical Query Form Template Project Construction Technical Query Log Template Project Construction As-Built Drawings Procedure Project Construction Temporary Works Procedure Project Construction Surveying Procedure Project Construction Survey Work Request Form Template Project Construction Civil Works Procedure Project Construction Utility Strike Investigation Report Form Template Project Construction Inspection and Test Plan for Inspection of Excavation and Backfill Template Document number EPM-KC0-GL-000001 EPM-KCC-PR-000001 EPM-KCC-PR-000005 EPM-KCC-TP-000011 EPM-KCC-TP-000012 EPM-KCC-TP-000013 EPM-KCC-PR-000002 EPM-KCC-TP-000001 EPM-KCC-TP-000002 EPM-KCC-GL-000001 EPM-KCC-PR-000004 EPM-KCC-TP-000010 EPM-KCC-PR-000003 EPM-KCC-TP-000003 EPM-KCC-TP-000004 EPM-KCC-TP-000005 EPM-KCC-TP-000006 EPM-KCC-TP-000007 EPM-KCC-TP-000014 EPM-KCC-TP-000008 EPM-KCC-TP-000009 EPM-KCS-PR-000001 EPM-KCS-TP-000001 EPM-KCS-TP-000002 EPM-KCS-TP-000003 EPM-KCS-TP-000004 EPM-KCE-PR-000003 EPM-KCE-TP-000019 EPM-KCE-PR-000002 EPM-KCE-TP-000004 EPM-KCE-TP-000005 EPM-KCE-PR-000007 EPM-KCE-PR-000006 EPM-KCE-PR-000005 EPM-KCE-TP-000009 EPM-KCE-PR-000009 EPM-KCE-TP-000011 EPM-KCE-TP-000012 AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 37 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department Document Name Project Construction Inspection and Test Plan for Inspection of Formwork, Reinforcement and Concreting Activities Template Project Construction Inspection and Test Plan for Inspection of Structural Steel Activities Template Project Construction Inspection and Test Plan for Inspection of Wall, Cladding Panels Template Project Activities Construction Inspection and Test Plan for Inspection of Blockwork Activities Template Project Construction Inspection and Test Plan for Inspection of Gypsum Plasterboard Wall Activities Template Document number EPM-KCE-TP-000013 EPM-KCE-TP-000014 EPM-KCE-TP-000015 EPM-KCE-TP-000016 EPM-KCE-TP-000017 Project Construction Concrete Pour Card Template Project Construction Electrical Works Procedure Project Construction Inspection and Test Plan for Cable Tray Activities Template Project Construction Inspection and Test Plan for Cable Installation Activities Template Project Construction Inspection and Test Plan for Electrical Equipment Activities Template EPM-KCE-TP-000020 EPM-KCE-PR-000004 Project Construction Mechanical Works Procedure Project Construction Static Equipment Checklist Template Project Construction Rotating Equipment Checklist Template Project Construction Inspection and Test Plan for Mechanical Equipment Installation Activities Template Project Construction Piping Works Procedure Project Construction Inspection and Test Plan for Piping Works Template Project Construction Welding Works Procedure Project Construction Inspection and Test Plan for Inspection of Welding Activities Report Project Construction Field Material Management Procedure Project Construction Quality Management System Procedure Project Construction Material Receipt Inspection Report Template Project Construction Contractors Surveillance Report Template Project Construction Inspection and Testing Form Template Project Construction Request for Inspection Form Template Project Construction Control of Non-Conforming Items Procedure Project Construction Non-Conformance Report Template Project Construction Trend Analysis Worksheet Template Project Construction Control of Material Testing Procedure Project Construction Testing Program Forecast Template Project Construction Testing Program Monthly Work Schedule Notification Template Project Construction Testing Program Work Request Template EPM-KCE-PR-000001 EPM-KCE-TP-000001 EPM-KCE-TP-000002 EPM-KCE-TP-000006 EPM-KCE-TP-000007 EPM-KCE-TP-000008 EPM-KCE-TP-000003 EPM-KCE-PR-000010 EPM-KCE-TP-000018 EPM-KCE-PR-000008 EPM-KCE-TP-000010 EPM-KCM-PR-000001 EPM-KCQ-PR-000005 EPM-KCQ-TP-000004 EPM-KCQ-TP-000005 EPM-KCQ-TP-000006 EPM-KCQ-TP-000007 EPM-KCQ-PR-000006 EPM-KCQ-TP-000008 EPM-KCQ-TP-000009 EPM-KCQ-PR-000004 EPM-KCQ-TP-000001 EPM-KCQ-TP-000002 EPM-KCQ-TP-000003 AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 38 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department 7.8 Learning and Development References: 7.8.1 Leadership Development Document Name The Coaching Skills Workshop Forthright Conversations Building Highly Effective Teams Performance Based Leadership Running Effective Meetings Supervisor Development Document number ENT-ML0-TM-000001 ENT-ML0-TM-000003 ENT-ML0-TM-000015 ENT-ML0-TM-000006 ENT-ML0-TM-000007 ENT-ML0-TM-000008 7.8.2 Leading Change Document Name Championing and Enabling Change Dynamics of Change Navigating Your Team Through Change Leading Change Workshop Document Number ENT-ML0-TM-000016 ENT-ML0-TM-000013 ENT-ML0-TM-000005 ENT-ML0-TM-000004 7.8.3 Professional Development Document Name Communication Skills Cultural Diversity in the Workplace Facilitating Learning Workshop Influencing Skills Presentation Skills Document Number ENT-ML0-TM-000011 ENT-ML0-TM-000012 ENT-ML0-TM-000002 ENT-ML0-TM-000014 ENT-ML0-TM-000009 7.8.4 Project Management Curricula Document Name Construction Management Continuous Improvement Workshop Contracts Management - Professional Training Course Document Management - Professional Training Course Engineering Management - Professional Training Course Estimating and Cost Control - Professional Training Course Document Number ENT-KC0-TM-000001 ENT-EC0-TM-000001 ENT-KD0-TM-000001 NPM-ID0-TM-000001 ENT-KE0-TM-000001 ENT-KPC-TM-000001 AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 39 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department Document Name Introduction to Projects Control - Professional Training Course Introduction to Risk Management - Professional Training Course Planning and Scheduling - Professional Training Course Project Management - Professional Training Course Quality Management Workshop Stage Gate Process Workshop Testing & Commissioning Management The 5-Year Projects Portfolio Plan - Professional Training Course Document Number ENT-KP0-TM-000001 ENT-EM0-TM-000001 ENT-KPP-TM-000001 ENT-DP0-TM-000001 ENT-EQ0-TM-000001 EPM-EQ0-TM-000001 ENT-KT0-TM-000001 ENT-S00-TM-000001 AJS-A01-PMO-PR-000001 Rev 00x Level - 3-I - Internal Page 40 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision. Operating Procedure for AMANA (insert name of AMANA Dept i.e Roads and Lighting) Department 8.0 ATTACHMENTS 8.1 EXPRO National Manual for Projects Management – Soft copies of all documents referred to in Section 7.0 AJS-A01-PMO-PR-000001 Rev 00 Level - 3 I - Internal 41 of 41 Electronic documents once printed, are uncontrolled and may become out-dated. Refer to ECMS for current revision.
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )